WBS 3 - Pressure washer Kärcher - Free user manual and instructions
Find the device manual for free WBS 3 Kärcher in PDF.
| Product type | High-pressure cleaner (Water Booster) |
| Brand | Kärcher |
| Model | WBS 3 |
| Intended use | Domestic: cleaning of garden furniture, toys, tools, plant pots, bins, lightly soiled gardening equipment, watering |
| Power supply | 2 AA 1.5 V batteries (not included) |
| Max. supply pressure | 10 bar |
| Battery life at full charge | Approximately 60 minutes |
| Spray modes | Jet stream (position 1) and rotating jet (position 2) |
| Weight (ready for use with batteries) | 0,45 kg |
| Dimensions (L × W × H) | 215 × 70 × 180 mm |
| Allowable ambient temperature | 0 to 35 °C |
| Sound pressure level (LpA) | 54 dB(A) |
| Sound power level (LwA) | 68 dB(A) |
| Hand-arm vibration | 0,1 m/s² |
| Water connection | Garden hose with quick coupler |
| Safety devices | Main on/off switch, frost protection (drain after use) |
| Maintenance | Drain the device after each use, replace batteries if necessary |
| Spare parts and accessories | Use only original Kärcher accessories |
| Warranty | According to country conditions, material or manufacturing defects |
Frequently Asked Questions - WBS 3 Kärcher
User questions about WBS 3 Kärcher
0 question about this device. Answer the ones you know or ask your own.
Ask a new question about this device
Download the instructions for your Pressure washer in PDF format for free! Find your manual WBS 3 - Kärcher and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. WBS 3 by Kärcher.
USER MANUAL WBS 3 Kärcher
Register your product
www.kaercher.com/welcome

natural_image
Black and white handheld device with a textured grip and connector (no visible text or symbols)
Deutsch 4
English 10
Français 15
Italiano 20
Nederlands 26
Español 31
Português 37
Dansk 42
Norsk 48
Svenska 53
Suomi 58
Ελληνικά 63
Türkçe 69
Русский 74
Magyar 81
Čeština 86
Slovenščina 91
Polski 97
Românește 102
Slovenčina 108
Hrvatski 113
Srpski 118
Български 124
Eesti 130
Latviešu 135
Lietuviškai 140
Українська 146
Қазақша 152
中文 158
繁體中文 162
العربية

59687230

(11/19)



natural_image
Black handheld hairdryer with a cable being inserted, showing a black arrow pointing to the cable (no text or symbols visible)

Inhalt
General notes.... 10
Safety instructions 10
Intended use.... 11
Environmental protection.... 12
Accessories and spare parts 12
Scope of delivery.... 12
Safety devices 12
Description of the device 12
Initial startup 13
Operation.... 13
Storage 13
Care and service 14
Troubleshooting guide 14
Warranty 14
Technical data.... 14
General notes

Read these original operating instructions and the safety instructions chapter before using the device for the first time. Act in accordance with them.
Keep them safe for future reference or for future owners.
Safety instructions
Hazard levels
⚠️DANGER
- Indication of an imminent threat of danger that will lead to severe injuries or even death.
⚠ WARNING
- Indication of a potentially dangerous situation that may lead to severe injuries or even death.
⚠CAUTION
- Indication of a potentially dangerous situation that may lead to minor injuries.
ATTENTION
- Indication of a potentially dangerous situation that may lead to damage to property.
Safe handling
⚠ WARNING • The device is not intended for use by children, persons with restricted physical, sensory or mental abilities or persons unfamiliar with these instructions. ● Persons with reduced physical, sensory or mental capabilities and persons lacking experience and knowledge may only use the appliance if they are properly supervised, have been instructed on use of the appliance safely by a person responsible for their safety, and understand the resultant hazards in-
volved. ● Children must not play with the appliance. ● Children must be supervised to prevent them from playing with the appliance. ● Only use the device for its proper use. Take into account the local conditions and beware of third parties, in particular children, when working with the device. ● Adhere to the respective safety regulations in hazard zones (e.g. service stations). Never operate the device in explosive spaces. ● Do not spray any objects which contain harmful substances (e.g. asbestos). ● Risk of injury. Do not direct the spray jet on-to the eyes.
⚠️ CAUTION • Do not use the appliance if it has been dropped beforehand, is visibly damaged or if it is leaking. ● Only operate or store the device in accordance with the description or figure.
ATTENTION • Do not fill with any cleaning agents or other supplements. • Damage to the device. Never use the device with solvents, liquids containing solvents or undiluted acids (e.g. detergents, petrol, paint thinner and acetone). • Do not operate the device at temperatures below 0 °C.
Intended use
Only use the water booster WBS 3 in private households. The device is intended for cleaning lightly and superficially soiled garden furniture, toys, tools, plant pots, waste containers and garden machines. Carefully applied, the device is also suitable for watering.
Environmental protection

The packing materials can be recycled. Please dispose of packaging in accordance with the environmental regulations.

Electrical and electronic devices contain valuable, recyclable materials and often components such as batteries, rechargeable batteries or oil, which - if handled or disposed of incorrectly - can pose a potential danger to human health and the environment. However, these components are required for the correct operation of the device. Devices marked by this symbol are not allowed to be disposed of together with the household rubbish.

Cleaning work producing in oily waste water, e.g. washing engines, washing undercarriages etc., may only be formed at washing stations with an oil separator.

Working with detergents may only be performed on watertight surfaces with connection to the waste water sew-system. Do not allow detergent to enter waterways or the

Extraction of water from public waterways is not permitted in some countries.
Notes on the content materials (REACH)
Current information on content materials can be found at: www.kaercher.de/REACH
Accessories and spare parts
Only use original accessories and original spare parts. They ensure that the appliance will run fault-free and safely. Information on accessories and spare parts can be found at www.kaercher.com.
Scope of delivery
The scope of delivery for the appliance is shown on the packaging. Check the contents for completeness when unpacking. If any accessories are missing or in the event of any shipping damage, please notify your dealer.
Safety devices
△CAUTION
Missing or modified safety devices
Safety devices are provided for your own protection.
Never modify or bypass safety devices.
Power switch
The power switch shuts off the motor when released and the spray jet stops.
Description of the device
The maximum amount of equipment is described in these operating instructions. Depending on the model used, there are differences in the scope of delivery (see packaging).
For the illustrations, refer to the graphics page Illustration A
①Power switch
② Nozzle
③Type plate
④Battery compartment
⑤Device connection
Initial startup
Insert batteries
Note
● Use two AA 1.5 V batteries.
- Do not use different batteries.
- Do not short the poles.
For information on the operating time with full battery charge, see chapter Technical data.
- Open the battery cover. Illustration B
- Insert the batteries, paying attention to the correct alignment of the poles.
- Close the battery cover.
Connection to the water line
- Attach the garden hose to the device connection with a commercially available quick coupling. Illustration C
- Connect the garden hose to the water line.
- Open the water tap fully.
Operation
△CAUTION
Spray jet
Eye injuries and hearing damage
Do not direct the spray jet at eyes or ears.
1. Press the power switch.
Operation with point jet
The point jet is suitable for the precise cleaning of superficial dirt spots.
- Push the power switch to position 1. Illustration D
Operating with the rotating spray jet
The rotating spray jet is suitable for quick cleaning of slightly soiled surfaces.
- Push the power switch to position 2. Illustration E
Interrupting operation
- Release the power switch.
The spray jet stops.
Ending operation
- Release the power switch.
- Close the water tap.
- Actuate the power switch until no more water is emitted.
- Release the power switch.
- Disconnect the device from the water supply.
- Remove the batteries from the device.
Storage
ATTENTION
Leaking batteries
Risk of corrosion
Remove the batteries from the device.
Frost protection
ATTENTION
Danger of frost
Incompletely emptied devices can be destroyed by frost.
Empty the device completely.
Protect the device from frost.
- Take the device out of operation (see chapter Ending operation).
Storing the device
- Place the device on a level surface.
- Store the device within the permissible temperature range (see Chapter Technical data).
Care and service
Emptying the device
ATTENTION
Water remaining in the device
Device damage due to rust and corrosion.
Empty the device completely after each use.
- Take the device out of operation (see chapter Ending operation).
Replacing the batteries
- Remove the batteries from the device.
- Insert new batteries (see chapter Insert batteries).
Troubleshooting guide
Rotating spray jet does not work
Batteries empty/defective
- Insert new batteries (see chapter Insert batteries).
- Check the battery condition.
Warranty
The warranty conditions issued by our relevant sales company apply in all countries. We shall remedy possible malfunctions on your appliance within the warranty period free of cost, provided that a material or manufacturing defect is the cause. In a warranty case, please contact your dealer (with the purchase receipt) or the next authorised customer service site. (See overleaf for the address)
Technical data
Device performance data
| Nominal voltage V 3 | |
| Feed pressure (max.) bar 10 | |
| Speed 1/min 600 - 1100 | |
| Operation duration with fully loaded battery | min 60 |
| Ambient temperature °C 0 - 35 | |
Electrical connection/Battery
| Battery type 2 x 1,5 V AA | |
| Recommended battery capacity Ah | 2 |
Dimensions and weights
| Length | mm | 215 |
| Width | mm | 70 |
| Height mm 180 | ||
| Weight (ready for operation with batteries) | kg | 0,45 |
Determined values in acc. with EN 60335-2-79
| Hand-arm vibration value | m/s ^2 | 0,1 |
| Sound pressure level L_pA | dB(A) | 54 |
| Sound power level L_wA | dB(A) | 68 |
Subject to technical modifications.
Contenu
Batterijen leeg/defect
- retirement des Privacy Group, 100%
تيار الرش ي Coordف.
إいかف التشفيل
- retirement des Privacy Group, 100%
natural_image
Black and white icon of a hand giving a thumbs-up gesture (no text or symbols)THANK YOU!
MERCI! DANKE! iGRACIAS!

Register your product and benefit from many advantages.
www.kaercher.com/welcome


Rate your product and tell us your opinion.
natural_image
Symbolic icon showing a gear and wrench inside a square frame (no text or symbols)www.kaercher.com/dealersearch
Alfred Kärcher SE & Co. KG
Alfred-Kärcher-Str. 28-40
71364 Winnenden (Germany)
Tel.: +49 7195 14-0
Fax: +49 7195 14-2212
