Yarvik Ingenia Nimity SMP40-200 - Smartphone

Ingenia Nimity SMP40-200 - Smartphone Yarvik - Free user manual and instructions

Find the device manual for free Ingenia Nimity SMP40-200 Yarvik in PDF.

📄 553 pages English EN Download 💬 AI Question 10 questions ⚙️ Specs
Notice Yarvik Ingenia Nimity SMP40-200 - page 3
Pick your language and provide your email: we'll send you a specifically translated version.
Product type Smartphone
Brand Yarvik
Model Ingenia Nimity SMP40-200
Dimensions Approximately 125 x 65 x 12 mm
Weight Approximately 140 g
Screen Capacitive touchscreen, size approximately 4 inches
Screen resolution 480 x 800 pixels (estimated)
Processor Dual core 1 GHz (estimated)
RAM memory 512 MB (estimated)
Internal storage 4 GB (estimated)
Battery Rechargeable lithium-ion, 1500 mAh (estimated)
Dual SIM Yes, two SIM slots
Mobile network GSM 850/900/1800/1900, WCDMA 900/2100 (estimated)
WiFi 802.11 b/g/n
Bluetooth Integrated Bluetooth module
Rear camera Approximately 5 megapixels (estimated)
Front camera Approximately 0.3 megapixel (estimated)
Operating system Android (version 4.x estimated)
Maintenance and cleaning Use a slightly damp cotton cloth with water
Safety Do not expose to moisture, dust, magnetic fields, extreme temperatures

Frequently Asked Questions - Ingenia Nimity SMP40-200 Yarvik

How to activate WiFi on my Yarvik Ingenia Nimity SMP40-200?
Go to Settings > WiFi, then slide the button to On. Select your network and enter the security key if necessary.
How to connect a Bluetooth device?
Enable Bluetooth in Settings > Bluetooth. Your phone will automatically search for devices. Select the desired device and enter the PIN code (usually 0000 or 1234).
How to insert a SIM card?
Turn off the phone, remove the back cover and battery. Insert the SIM cards into the designated slots, then reassemble.
How to transfer files to a computer via USB?
Connect the USB cable to the phone and computer. On the phone, swipe down the notification bar and tap USB connected, then Enable USB storage. The memory will appear as an external drive.
How to increase battery life?
Reduce screen brightness in Settings > Display, disable WiFi and Bluetooth when not in use, and close background apps via the multitasking button.
How to make a phone call?
Open the Phone app, dial the number using the keypad, then press the call key. For an international call, hold down the 0 key to get the +.
How to send an SMS?
Open the Messaging app, tap the new message icon, enter the recipient's number and the text, then send.
How to add a widget to the home screen?
Tap the apps button at the bottom of the home screen, then the Widgets tab. Long-press the chosen widget and drag it to an empty spot on the home screen.
How to update the software?
Go to Settings > About phone > Software update (requires an Internet connection). Follow the on-screen instructions.
What to do if the touch screen stops responding?
Try restarting the phone by holding the power button. If the problem persists, remove the battery for a few seconds then replace it. If nothing works, contact technical support.

User questions about Ingenia Nimity SMP40-200 Yarvik

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Smartphone in PDF format for free! Find your manual Ingenia Nimity SMP40-200 - Yarvik and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. Ingenia Nimity SMP40-200 by Yarvik.

USER MANUAL Ingenia Nimity SMP40-200 Yarvik

1 Prior to first use

2 Smartphone Startup

3 Android Home Screen

3.1 Adding widgets and shortcuts to your Home Screen

3.2 Setting a Wallpaper

3.3 Application Menu

4 Setting up your Smartphone

4.1 Settings Menu

4.2 WiFi & Bluetooth

4.3 Audio Profiles

4.4 Display

4.5 Apps

4.6 Storage & MicroSD memory Access

4.7 Language & input

4.8 Date & time

5 Apps

6 Phone Calls

7 Messaging

8 Warranty Statement

9 GNU/GPL Licensing Info

10 Important

Information

1 Prior to first use

Dear user,

Thank you for purchasing our product.

To ensure you a quick and convenient use of your new Yarvik Smartphone, please read these instructions carefully prior to use.

We hope you will absolutely enjoy your Yarvik Smartphone for the longest time possible!

Please note:

  • Your Yarvik Smartphone is a high precision electronic product, do not try to disassemble the Smartphone, as this will void your warranty and may result in malfunctioning of the device;
  • Avoid strong beating of or to the product;
  • Avoid using the Smartphone in a high or low temperature environment, or in any environment where the device can get in contact with moisture, dust or magnetic fields;
  • Do not expose the Smartphone to strong sunlight for an extended period of time;
  • Don't operate the touch screen of the Smartphone with sharp objects, as this may result in scratching the screen surface;
  • Using connected headphones on the Smartphone for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage;

Yarvik smartphone manual

  • Do not cross the road, drive a motor vehicle or bicycle while using the Smartphone with headphones to avoid traffic accidents;
  • Only use permitted batteries, chargers and accessories with your Yarvik Smartphone. The use of any other products with the Smartphone can be dangerous and may violate the warranty regulations;
  • Only use a slightly wet cotton cloth to clean the Smartphone, and only use water to wetten the cotton cloth. The Smartphone should not be cleaned with any sort of (glass) cleaning aid.

You may go ahead and use your Yarvik Smartphone right out of the box, without charging the battery first. It is best for the battery to first run on the charge left in it, and to be fully recharged once it's completely drained for the first time.

If the Smartphone isn't switching on right out of the box, the battery is already completely drained and you should of course recharge it first.

Yarvik Ingenia Nimity SMP40-200 - Yarvik smartphone manual - 1

Return to index

2

Smartphone Startup

When you first power on your Yarvik Smartphone, you will be presented the startup sequence.

The very first startup may take a while, approximately 2-3 minutes.

After the startup sequence the Smartphone has completed starting up and you will be presented the Android Lock Screen.

Yarvik smartphone manual

11:40 AM TUE, AUGUST 6 Charged A NO SIM CARD - EMERGENCY CALLS ONLY

Android Lock Screen

Slide the lock bar (A) to the right to unlock the Smartphone. You will then be taken to the Android Home Screen.

Return to index

3 Android Home Screen

Yarvik smartphone manual

Google Play Store - Microsoft FBReader ES File Explor 1 2 3 11:41 AM 4 5 6

Android Home Screen

On top of the Smartphone's screen you can always find the status bar.

The status bar displays system information, while the lower menu bar contains the function buttons.

1 - Wi-Fi Signal Indicator
2 - Cellular network reception for SIM1 and SIM2 and Battery Level Indicator
3 - System Time
4 - App Shortcuts
5 - Widget (analog clock)
6 - App and widget menu

The home screen consists of multiple pages which can be accessed by swiping the home screen left/right.

To see what apps are running in the background, you can access the multitasking view by pressing the multitask button (9).

Yarvik smartphone manual

ES File Explor Alarma Android BCM Download prophrite LOST DIR Movie nhblog Settings Data usage Mouse... Server Audio profiles Display Storage Play Store OfficeSuite OfficeSuite 6 Reserve Site Any structures Product update A new version of OfficeSuite is

Click on a running app in the multitask view to quickly switch to it. You can close running apps by long pressing it and clicking "Remove from list".

Return to index

Adding widgets and 3.1 shortcuts to your Home Screen

To add a widget, press the app and widget button in the bottom center of your Home Screen:

Yarvik Ingenia Nimity SMP40-200 - Adding widgets and 3.1 shortcuts to your Home Screen - 1

In the following screen, you can find all the installed apps and widgets, both separately viewable by pressing "Apps" or "Widgets" on top of the screen respectively.

Press "Widgets" to view all available widgets. When showing all widgets, you can swipe the screen to browse to the next page (if available).

Press and hold the desired widget to have the Home Screen show up and release the widget to any empty spot on the home screen.

To add a shortcut to any app, press the app and widget button in the bottom center of your Home Screen:

Yarvik Ingenia Nimity SMP40-200 - Adding widgets and 3.1 shortcuts to your Home Screen - 2

In the following screen, you can find all the installed apps and widgets, both separately viewable by pressing "Apps" or "Widgets" on top of the screen respectively.

Press "Apps" to view all installed apps.

Press and hold the desired app to have the home screen show up and release the shortcut to any empty spot on the Home Screen.

To remove widgets and/or app shortcuts from your Home Screen, press and hold them and drag them to the appeared "Remove" dustbin icon on top of your Home Screen.

Return to index

3.2 Setting a Wallpaper

To change the Home Screen wallpaper, press and hold the Home Screen until the “Select Wallpaper from” menu comes up.

You can choose from "Live Wallpapers" (animated wallpapers), "Gallery" (photo/video gallery) or "Wallpapers" (default static images).

Return to index

3.3 Application Menu

Press the app and widget button in the bottom center of your Home Screen:

Yarvik Ingenia Nimity SMP40-200 - Application Menu - 1

When the system displays the widgets, press "Apps" to view all installed apps.

Here you can find all the pre-installed programs or "apps" as well as additional apps that you install. You can launch any app by just pressing the corresponding icon.

Yarvik smartphone manual

APPS WIDGETS Browser Calculator Calendar Camera Clock Downloads Email ES File Explorer FBReader Gallery Google Mail Latitude Maps Messaging Music Navigation OfficeSuite People Phone Places Play Store Search Settings SIM Toolkit Sound Recorder Video Player

Application Screen

Yarvik Ingenia Nimity SMP40-200 - Application Menu - 3

Return to index

Setting up your 4 Yarvik Smartphone

4.1 Settings Menu

Press the Settings icon in the Application Menu to enter the Settings menu. In the Settings menu you can find the options to set up your Yarvik Smartphone.

Settings WIRELESS & NETWORKS SIM management Wi-Fi ON Bluetooth ON Data usage

Yarvik smartphone manual

More... DEVICE Audio profiles Display Storage Battery Apps PERSONAL Location access Security Language & input Backup & reset ACCOUNTS Google Add account SYSTEM Date & time Scheduled power on & off Accessibility

Settings Menu

We will go through the most important parts:

Yarvik Ingenia Nimity SMP40-200 - Settings Menu - 3

Return to index

Yarvik Ingenia Nimity SMP40-200 - Settings Menu - 4

WiFi & Bluetooth

Wi-Fi

Set up a connection with a wireless Wi-Fi network. Slide the On/Off button to "On" to activate Wi-Fi.

WiFi Yarvik Connected Yarvik Support Secured with WPA/WPA2 (protected network available)

The available Wi-Fi networks appear in the network list at the right screen. Tap the network of your choice. If the network is secured, you're prompted to enter the network security key.

Press the "Connect" button and the Smartphone is connecting to the network.

Once “Connected” appears underneath the network name and the wireless reception icon is shown in the bottom status bar, you’re successfully connected to the wireless network.

Viewing your Yarvik Smartphone's Wi-Fi MAC address

While in the Wi-Fi settings screen, click on the menu button in the bottom right corner.

Scan WPS Pin Entry Wi-Fi Direct Advanced

Press "Advanced" in the unfolding menu.

Your Wi-Fi MAC address is displayed in the following "Advanced Wi-Fi" screen under "MAC address".

Bluetooth

Your Yarvik Smartphone is equipped with a built-in Bluetooth module for connecting with Bluetooth compatible peripherals, like keyboards, speakers and headphones, but also with Bluetooth handsfree headsets and carkits.

Slide the Bluetooth On/Off button to "On" to activate Bluetooth.

Once activated, your Yarvik Smartphone will automatically start searching for nearby Bluetooth devices. You can always manually search for Bluetooth devices by clicking "Search for Devices" in the top right corner of the screen.

It may be required for the to be connected peripherals to be put in "pairing mode". Please refer to the instructions manual of the concerning peripherals for this.

All discovered devices will appear in the "Available Devices" list:

Yarvik smartphone manual

SMP53-210 Not visible to other Bluetooth devices AVAILABLE DEVICES TOUCH TO PAIR BT-001 Pairing...

Click on the discovered Bluetooth device to pair your Yarvik Smartphone with it. The "Bluetooth pairing request" window will appear:

SMP53-210 Not visible to other Bluetooth devices AVAILABLE TOOLS TOUCH TO PAIR Bluetooth pairing request From: BT-001 Pair with this device? Cancel Pair

Most Bluetooth devices require a pin code to connect. This code usually is 0000 or 1234. Please refer to the instructions manual of your Bluetooth device if the pin code is different. After you have entered the correct pin code, press "OK".

Your Yarvik Smartphone will now start pairing with your Bluetooth device, and after a few seconds the connection will be completed, showing a "Connected" message underneath the concerning Bluetooth device in the "Available Devices" list:

BT-001 Connected

You can connect multiple Bluetooth devices to your Yarvik Smartphone for use at the same time (e.g. headset and keyboard).

Yarvik Ingenia Nimity SMP40-200 - Bluetooth - 4

4.3 Audio Profiles

Here you can change the audio volume of the Smartphone, like only vibration or vibration and ring notification for incoming calls/messages.

Yarvik Ingenia Nimity SMP40-200 - Audio Profiles - 1

4.4 Display

Here you can change the brightness of the display, font sizes and the auto sleep time.

Please note that the higher the display brightness, the higher the energy consumption. This will drain your battery substantially faster.

If you don't want the display to auto rotate as you tilt the Smartphone, you can enable/disable this functionality in the Auto-rotate screen setting.

Return to index

4.5 Apps

Here you can manage applications that are installed on your Yarvik Smartphone.

You can click apps that you have installed to see the app info and uninstall them if needed by using the

"Uninstall" button.

Please note that the preinstalled default applications (like e.g. the calculator) cannot be uninstalled.

Return to index

4.6

Storage &

MicroSD

memory

Access

Shows you the internal memory information. When a MicroSD card is present, you can also find the memory information of the inserted card here.

Connecting your Yarvik Smartphone to a PC or Mac by USB

You can connect your Yarvik Smartphone to a PC or Mac using the provided USB cable.

When connected to a computer, you can access the Smartphone's internal memory and, if present, an inserted MicroSD card as standard USB Mass Storage Device.

Please refer to the printed Quick Start Guide of your Yarvik Smartphone to determine the location of the Smartphone's USB port. Connect the USB cable to the USB port of your Yarvik Smartphone and to a free USB port on your computer.

In the top side of your Smartphone's screen, two messages will appear shortly after each other:

USB connected Select to copy files to/from your computer. USB debugging connected Select to disable USB debugging.

Once the second message "USB connected" appears, click on it.

The following screen will appear:

USB Mass Storage USB connected You have connected to your computer via USB. Touch the button below if you want to copy files between your computer and your Android's SD card. Turn on USB storage

Click on the button "Turn on USB storage".

A notification window will appear:

Turn on USB storage If you turn on USB storage, some applications you are using will stop and may be unavailable until you turn off USB storage. Cancel OK

Click on "OK" to confirm.

The internal memory of your Yarvik Smartphone will now appear as Mass Storage Drive in your computer's file system, and can be used e.g. to copy files from and to your Yarvik Smartphone.

If you have a MicroSD card in your Smartphone, the card will be recognized by the computer as a second Mass Storage Drive.

To stop using the Mass Storage Device function, click on the "Turn off USB storage" button and remove the USB cable.

Note: There are no hardware drivers needed to access the Yarvik Smartphone's memory. In the case your computer prompts for any driver installation, you can simply ignore it.

Yarvik Ingenia Nimity SMP40-200 - Connecting your Yarvik Smartphone to a PC or Mac by USB - 4

Access your MicroSD card in ES File Explorer

Open the ES File Explorer app and click on Local in the left "Fast Access" menu.

Fast Access Favorite Local Library Network Tools Alarm LOST.D

The Local list now unfolds, and shows all memory locations of the device.

The MicroSD card is usually one of the lowest options in de Local list, called external_sd in the below example:

Fast Access Favorite Local Home Device Download sdcard external_sd usb_storage Alarms Download Notifications

Please note that the name of the MicroSD card may differ. Other names like sd-ext or ext-sd may be used by your device.

When you have inserted a USB drive via the USB host port/adapter, this drive will become available as (in the above example) usb_storage.

The name for the USB drive may also differ.

Yarvik Ingenia Nimity SMP40-200 - Access your MicroSD card in ES File Explorer - 3

Return to index

4.7

Language & input

Use "Select language" to select the display language of your Yarvik Smartphone. This applies to all the screen texts in the entire system.

Under "Android keyboard" you may setup the onscreen keyboard of your Smartphone.

Yarvik Ingenia Nimity SMP40-200 - Language & input - 1

Return to index

4.8

Date & time

Here you can setup the date and the time for your Yarvik Smartphone.

Return to index

5 Apps

The Yarvik Smartphone will come with pre-installed Apps (see below examples):

APPS WIDGETS Browser Calculator Calendar Camera Clock Downloads Email ES File Explorer FBReader Gallery Google Mail Latitude Maps Messaging Music Navigation OfficeSuite People Phone Places Play Store Search Settings SIM Toolkit Sound Recorder Video Player

The appearance of app icons may change without prior notice.

Return to index

6 Phone Calls

Making phone calls

To make a phone call with your Yarvik Smartphone, open the "Phone" application from your application

menu or Android home screen:

Use the numeric phone keypad to enter the telephone number.

Yarvik smartphone manual

1 _qp_ 2 _ABC_ 3 _DEF_ 4 _GHI_ 5 _JKL_ 6 _MNO_ 7 _PQRS_ 8 _TUV_ 9 _WXYZ_ * 0 + # #

Phone keypad.

To make international phone calls, requiring the '+' prefix, press and hold the '0' on the keypad until the '+' appears.

Press the call handling button to engage the phone call.

Press the call handling button 📞 to disengage the phone call.

You can also make phone calls directly from your contacts from within the "People" application.

Recent calls are stored in the Call Log screen, accessible by pressing the Log button 📊 in the top of Phone screen.

Your contacts (from the earlier mentioned "People" app) can also be accessed directly from within the Phone screen by pressing the button.

Incoming phone calls

When you receive a phone call on your Yarvik Smartphone, you will be presented with 3 options:

Yarvik Ingenia Nimity SMP40-200 - Incoming phone calls - 1

natural_image Red and black interface toolbar with white icons representing media, audio, video, pause, and person (no text or symbols)

Options during a phone call

Add call Start recording 1 2 3 4 5

1 - Show the phone keypad (e.g. for DTMF option menu's);
2 - Enable/disable loud speaker function;
3 - Mute microphone;
4 - Put phone call on hold;
5 - Menu with more options: add an additional phone call (conversation call) or record the phone call.

Call forwarding

You can set the call forwarding feature to forward all incoming phone calls to a specific phone number.

In the "Phone" app press the menu button and select "Call settings".

Select "Voice call", in which you can choose for "Call forwarding" to adjust your forwarding options.

Caller ID/Call waiting

With the Caller ID function of your Yarvik Smartphone, you can choose whether you want to send your number along with outgoing phone calls.

To adjust this, start the "Phone" app "Additional settings" - "Caller ID".

Yarvik Ingenia Nimity SMP40-200 - Caller ID/Call waiting - 1

press the menu

Yarvik Ingenia Nimity SMP40-200 - Caller ID/Call waiting - 2

and select "Settings" - "Voice call" -

Within this same menu you can also enable/disable incoming phone calls when already engaged in a phone conversation.

Yarvik Ingenia Nimity SMP40-200 - Caller ID/Call waiting - 3

Return to index

Yarvik Ingenia Nimity SMP40-200 - Return to index - 1

Messaging

Your Yarvik Smartphone is capable of sending SMS and MMS messages. Please refer to your mobile service provider for involved costs and additional costs for sending messages to or from foreign countries.

Sending SMS/MMS messages

Open the "Messaging" application

Yarvik Ingenia Nimity SMP40-200 - Sending SMS/MMS messages - 1

from your Android home screen or application menu.

yarvik yarvik Type text message

Messaging application.

Set voicemail number/playback voicemail messages

To set your voicemail service number in your Yarvik Smartphone, open the "Phone" application from your

application menu or Android home screen:

Yarvik Ingenia Nimity SMP40-200 - Set voicemail number/playback voicemail messages - 1

Press and hold the 📄 on the phone keypad. The option screen "Add number" will appear. In the Voicemail options you can select the voicemail settings and enter your voicemail service number.

Once the voicemail service number has been set, you can subsequently use the button to call to your voicemail box by pressing and holding it.

Return to index

8 warranty Statement

Yarvik warrants that the product purchased by Customer shall be free from defects in workmanship or materials for a period of 2 years from the date of purchase by Customer. If, at any time during the warranty period, the product has a defect in workmanship or material, Customer should return the product to the dealer where the product has been purchased. Dealer shall repair or replace it (at Yarvik's sole option) within a reasonable period of time. An original invoice is required as proof of the purchase date. Yarvik's option with respect to this matter shall be final.

This warranty does not cover defects or malfunctions resulting from software transfers, misuse, abusive operation, tampering, negligence, improper use, insufficient care or any act beyond the control of Yarvik.

IMPORTANT: When you buy a Smartphone from Yarvik, your Smartphone will be provided to you with the latest stable firmware available for this specific model, at the time the unit was manufactured. Yarvik will not provide support to products that have otherwise been modified by the end user, nor does Yarvik support programming modifications to the firmware and software used in its products, and if any such modifications have been made, all warranties shall be automatically void.

To avoid invalidating the warranty offered hereunder, Customer should use only the official software, applications and upgrades available from Yarvik's website at www.yarvik.com.

No other software or firmware should be used, as such use will automatically void all warranties and support. Yarvik does not support the use of any software or firmware other than the software or firmware that was installed on the product by the manufacturer or that is available from Yarvik's official web site at www.yarvik.com. Yarvik explicitly declines to respond to any inquiries regarding unauthorized modifications, unauthorized software, and unauthorized firmware.

Return to index

Yarvik Ingenia Nimity SMP40-200 - Return to index - 1

GNU/GPL Licensing Information

Please consult the legal information available on your Yarvik Smartphone under Settings – About Smartphone – Legal information (internet connection required) or visit http://source.android.com/source/licenses.html for more information.

Return to index

10 Important Information

Wireless LAN-Regulatory information

Yarvik Ingenia Nimity SMP40-200 - Important Information - 1

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

  • Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic
  • with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 ("Code of Electronic
    Communications"). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;
  • with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Nimity SMP40-200 - Conditions of use - 1
WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic

equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

  • To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.
  • To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.
  • Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.
  • Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.
  • Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.
  • This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.
  • Observe the following precautions to provide adequate air circulation and to ensure normal reliable

operation:

  • Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.
  • Turn off the Smartphone device before putting the device into a bag or a carrying case.
  • Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.
  • Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.
  • Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.
  • Avoid strong beating of or to the product.
  • Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.
  • Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.
  • Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

  • If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.
  • In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.
  • If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.
  • Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.
  • If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender

Yarvik smartphone manual

and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

SAR

This product meets applicable national SAR limits of 2.0 W/kg.

For more information regarding the Specific Absorption Rate (SAR) please visit the following website: www.sar-tick.com.

When carrying the product or using it while worn on your body, either use an approved accessory such as a holster or otherwise maintain a distance of 1.5cm from the body to ensure compliance with RF exposure requirements. Note that the product may be transmitting even if you are not making a phone call.

Dimensions, specifications, images & illustrations

All dimensions, specifications, images and illustrations are subject to change without prior notice.

Yarvik smartphone manual

Yarvik Ingenia Nimity SMP40-200 - SAR - 1

facebook.com/yarvik

Yarvik Ingenia Nimity SMP40-200 - SAR - 2

twitter.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 3

youtube.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Nimity SMP40-200 - SAR - 5

Return to index

Yarvik Ingenia Nimity SMP40-200 - SAR - 6

Yarvik Ingenia Nimity SMP40-200 - SAR - 7

Index

SELECT LANGUAGE

Android Vergrendelingsscherm

Applicatiescherm

Yarvik Ingenia Nimity SMP40-200 - SELECT LANGUAGE - 1

Terug naar index

4

Uw smartphone instellen

4.1

Instellingenmenu

Yarvik smartphone manual

More... DEVICE Audio profiles Display Storage Battery Apps PERSONAL Location access Security Language & input Backup & reset ACCOUNTS Google Add account SYSTEM Date & time Scheduled power on & off Accessibility

Instellingenmenu

Klik op de knop "Turn on USB storage" (USB-opslag inschakelen).

natural_image Red and black interface icons including a telephone handset, speaker, microphone, pause, and speaker symbol (no text or labels)

Voicemailnummer instellen/voicemailberichten afluisteren

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic - with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 (“Code of Electronic Communications”). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted; - with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Nimity SMP40-200 - Conditions of use - 1

WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

  • To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.
  • To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.
  • Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air

ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.

  • Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.
  • Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.
  • This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.
  • Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:
  • Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.
  • Turn off the Smartphone device before putting the device into a bag or a carrying case.
  • Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.
  • Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.
  • Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.
  • Avoid strong beating of or to the product.
  • Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.
  • Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.
  • Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

  • If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.
  • In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers,

hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

- It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.

- This AC adapter is intended for use with the Smartphone device IT products only.

- Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

SAR

This product meets applicable national SAR limits of 2.0 W/kg.

For more information regarding the Specific Absorption Rate (SAR) please visit the following website:

Yarvik smartphone manual

www.sar-tick.com.

When carrying the product or using it while worn on your body, either use an approved accessory such as a holster or otherwise maintain a distance of 1.5cm from the body to ensure compliance with RF exposure requirements. Note that the product may be transmitting even if you are not making a phone call.

Dimensions, specifications, images & illustrations

All dimensions, specifications, images and illustrations are subject to change without prior notice.

Yarvik Ingenia Nimity SMP40-200 - SAR - 1

facebook.com/yarvik

Yarvik Ingenia Nimity SMP40-200 - SAR - 2

twitter.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 3

youtube.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Nimity SMP40-200 - SAR - 5

Return to index

Yarvik Ingenia Nimity SMP40-200 - SAR - 6

Yarvik Ingenia Nimity SMP40-200 - SAR - 7

Inhalt

SELECT LANGUAGE

Android Sperrbildschirm

Yarvik smartphone manual

Bluetooth Data usage More... DEVICE Audio profiles Display Storage Battery Apps PERSONAL Location access Security Language & input Backup & reset ACCOUNTS Google Add account SYSTEM Date & time Scheduled power on & off Accessibility

natural_image Red and black interface icons including a telephone handset, speaker, sound wave, pause, and user profile (no text or symbols)

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

  • Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic
  • with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 (“Code of Electronic Communications”). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;
  • with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Nimity SMP40-200 - Conditions of use - 1

WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

- Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.

- Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

- To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.

- To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.

- Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.

- Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.

- Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.

- This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.

- Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

- Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.

- Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.

- Avoid strong beating of or to the product.

- Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

SAR

This product meets applicable national SAR limits of 2.0 W/kg.

For more information regarding the Specific Absorption Rate (SAR) please visit the following website: www.sar-tick.com.

When carrying the product or using it while worn on your body, either use an approved accessory such as a holster or otherwise maintain a distance of 1.5cm from the body to ensure compliance with RF exposure requirements. Note that the product may be transmitting even if you are not making a phone call.

Dimensions, specifications, images & illustrations

All dimensions, specifications, images and illustrations are subject to change without prior notice.

facebook.com/yarvik twitter.com/yarvikce youtube.com/yarvikce forum.yarvik.com YARVIK.COM

Yarvik Ingenia Nimity SMP40-200 - SAR - 2

Yarvik Ingenia Nimity SMP40-200 - SAR - 3

Yarvik Ingenia Nimity SMP40-200 - SAR - 4

Index

SELECT LANGUAGE

Yarvik smartphone manual

Bluetooth Data usage More... DEVICE Audio profiles Display Storage Battery Apps PERSONAL Location access Security Language & input Backup & reset ACCOUNTS Google Add account SYSTEM Date & time Scheduled power on & off Accessibility

Menu de configuration

natural_image Red and black interface icons including a speaker, microphone, pause, and person (no text or symbols)

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania,

Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic

- with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 (“Code of Electronic Communications”). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;

- with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Nimity SMP40-200 - Conditions of use - 1

WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery

provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

  • To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.
  • To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.
  • Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.
  • Turning off your Smartphone device with the power button does not disconnect the device completely from

mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.

- Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.

- This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.

- Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

- Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.

- Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.

- Avoid strong beating of or to the product.

- Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

• In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

- It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.

- This AC adapter is intended for use with the Smartphone device IT products only.

- Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

SAR

This product meets applicable national SAR limits of 2.0 W/kg.

For more information regarding the Specific Absorption Rate (SAR) please visit the following website: www.sar-tick.com.

When carrying the product or using it while worn on your body, either use an approved accessory such as a holster or otherwise maintain a distance of 1.5cm from the body to ensure compliance with RF exposure requirements. Note that the product may be transmitting even if you are not making a phone call.

Yarvik smartphone manual

Dimensions, specifications, images & illustrations

All dimensions, specifications, images and illustrations are subject to change without prior notice.

Yarvik Ingenia Nimity SMP40-200 - SAR - 1

facebook.com/yarvik

Yarvik Ingenia Nimity SMP40-200 - SAR - 2

twitter.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 3

youtube.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Nimity SMP40-200 - SAR - 5

Return to index

Yarvik Ingenia Nimity SMP40-200 - SAR - 6

YARVIK

Índice

SELECT LANGUAGE

Yarvik smartphone manual

Bluetooth Data usage More... DEVICE Audio profiles Display Storage Battery Apps PERSONAL Location access Security Language & input Backup & reset ACCOUNTS Google Add account SYSTEM Date & time Scheduled power on & off Accessibility

Haga clic en "OK" ("Aceptar") para confirmar.

natural_image Red and black interface icons including a speaker, sound block, pause, and speaker symbol (no text or labels)

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic

- with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 (“Code of Electronic Communications”). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;

- with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Nimity SMP40-200 - Conditions of use - 1

WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract.

This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

- To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.

- To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.

- Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.

- Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.

- Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.

- This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.

- Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

- Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.

- Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.

- Avoid strong beating of or to the product.

- Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes,

in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

SAR

This product meets applicable national SAR limits of 2.0 W/kg.

For more information regarding the Specific Absorption Rate (SAR) please visit the following website: www.sar-tick.com.

When carrying the product or using it while worn on your body, either use an approved accessory such as a holster or otherwise maintain a distance of 1.5cm from the body to ensure compliance with RF exposure requirements. Note that the product may be transmitting even if you are not making a phone call.

Dimensions, specifications, images & illustrations

All dimensions, specifications, images and illustrations are subject to change without prior notice.

Yarvik Ingenia Nimity SMP40-200 - SAR - 1

facebook.com/yarvik

Yarvik Ingenia Nimity SMP40-200 - SAR - 2

twitter.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 3

youtube.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Nimity SMP40-200 - SAR - 5

Return to index

Yarvik Ingenia Nimity SMP40-200 - SAR - 6

Yarvik Ingenia Nimity SMP40-200 - SAR - 7

Indice

SELECT LANGUAGE

4.8 Date & time (Data e

ora)

Yarvik smartphone manual

Bluetooth Data usage More... DEVICE Audio profiles Display Storage Battery Apps PERSONAL Location access Security Language & input Backup & reset ACCOUNTS Google Add account SYSTEM Date & time Scheduled power on & off Accessibility

natural_image Red and black interface icons including a telephone handset, speaker, microphone, pause, and speaker symbol (no text or labels)

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the

following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic

- with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 (“Code of Electronic Communications”). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;

- with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Nimity SMP40-200 - Conditions of use - 1

WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with

separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

  • To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.
  • To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.
  • Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or

speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.

  • Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.
  • Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.
  • This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.
  • Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:
  • Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.
  • Turn off the Smartphone device before putting the device into a bag or a carrying case.
  • Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.
  • Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.
  • Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.
  • Avoid strong beating of or to the product.
  • Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.
  • Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.
  • Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

  • If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.
  • Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.
  • If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

SAR

This product meets applicable national SAR limits of 2.0 W/kg.

For more information regarding the Specific Absorption Rate (SAR) please visit the following website:

www.sar-tick.com.

Yarvik smartphone manual

When carrying the product or using it while worn on your body, either use an approved accessory such as a holster or otherwise maintain a distance of 1.5cm from the body to ensure compliance with RF exposure requirements. Note that the product may be transmitting even if you are not making a phone call.

Dimensions, specifications, images & illustrations

All dimensions, specifications, images and illustrations are subject to change without prior notice.

Yarvik Ingenia Nimity SMP40-200 - SAR - 1

facebook.com/yarvik

Yarvik Ingenia Nimity SMP40-200 - SAR - 2

twitter.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 3

youtube.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Nimity SMP40-200 - SAR - 5

Return to index

Yarvik Ingenia Nimity SMP40-200 - SAR - 6

YARVIK

Índice

SELECT LANGUAGE

Ecrã de aplicações

Yarvik Ingenia Nimity SMP40-200 - SELECT LANGUAGE - 1

Voltar ao índice

4 Configurar o seu Smartphone Yarvik

Yarvik Ingenia Nimity SMP40-200 - Configurar o seu Smartphone Yarvik - 1

Yarvik smartphone manual

Data usage More... DEVICE Audio profiles Display Storage Battery Apps PERSONAL Location access Security Language & input Backup & reset ACCOUNTS Google Add account SYSTEM Date & time Scheduled power on & off Accessibility

Menu de definições

natural_image Red and black interface icons including a speaker, megaphone, pause, and person (no text or symbols)

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic

- with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 (“Code of Electronic Communications”). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;

- with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Nimity SMP40-200 - Conditions of use - 1

WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract.

This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

- To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.

- To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.

- Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.

- Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.

- Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.

- This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.

- Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

- Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.

- Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.

- Avoid strong beating of or to the product.

- Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes,

in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

SAR

This product meets applicable national SAR limits of 2.0 W/kg.

For more information regarding the Specific Absorption Rate (SAR) please visit the following website: www.sar-tick.com.

When carrying the product or using it while worn on your body, either use an approved accessory such as a holster or otherwise maintain a distance of 1.5cm from the body to ensure compliance with RF exposure requirements. Note that the product may be transmitting even if you are not making a phone call.

Dimensions, specifications, images & illustrations

All dimensions, specifications, images and illustrations are subject to change without prior notice.

Yarvik Ingenia Nimity SMP40-200 - SAR - 1

facebook.com/yarvik

Yarvik Ingenia Nimity SMP40-200 - SAR - 2

twitter.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 3

youtube.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Nimity SMP40-200 - SAR - 5

Return to index

Yarvik Ingenia Nimity SMP40-200 - SAR - 6

Yarvik Ingenia Nimity SMP40-200 - SAR - 7

Spis treści

SELECT LANGUAGE

Ekran aplikacji

Yarvik Ingenia Nimity SMP40-200 - Spis treści - 1

Powrót do indeksu

Yarvik smartphone manual

Data usage More... DEVICE Audio profiles Display Storage Battery Apps PERSONAL Location access Security Language & input Backup & reset ACCOUNTS Google Add account SYSTEM Date & time Scheduled power on & off Accessibility

Menu ustawień

Yarvik smartphone manual

natural_image Red and black interface icons including a telephone handset, speaker, microphone, pause, and user profile (no text or symbols)

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic - with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 ("Code of Electronic Communications"). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted; - with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Nimity SMP40-200 - Conditions of use - 1
WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling.

Business users should contact their supplier and check the terms and conditions of the purchase contract.

This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
    • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

• To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.

• To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.

- Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.

- Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.

- Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.

- This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.

- Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

  • Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.
  • Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.
  • Avoid strong beating of or to the product.
  • Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.
  • Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.
  • Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for

any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

SAR

This product meets applicable national SAR limits of 2.0 W/kg.

For more information regarding the Specific Absorption Rate (SAR) please visit the following website: www.sar-tick.com.

When carrying the product or using it while worn on your body, either use an approved accessory such as a holster or otherwise maintain a distance of 1.5cm from the body to ensure compliance with RF exposure requirements. Note that the product may be transmitting even if you are not making a phone call.

Dimensions, specifications, images & illustrations

All dimensions, specifications, images and illustrations are subject to change without prior notice.

Yarvik smartphone manual

Yarvik Ingenia Nimity SMP40-200 - SAR - 1

facebook.com/yarvik

Yarvik Ingenia Nimity SMP40-200 - SAR - 2

twitter.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 3

youtube.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Nimity SMP40-200 - SAR - 5

Return to index

Yarvik Ingenia Nimity SMP40-200 - SAR - 6

Yarvik Ingenia Nimity SMP40-200 - SAR - 7

Rejstřík

SELECT

LANGUAGE

4.8 Date & time (Datum

a čas)

Obrazovka aplikací

Yarvik Ingenia Nimity SMP40-200 - a čas) - 1

Návrat do rejstříku

Yarvik smartphone manual

Wi-Fi Bluetooth Data usage More... DEVICE Audio profiles Display Storage Battery Apps PERSONAL Location access Security Language & input Backup & reset ACCOUNTS Google Add account SYSTEM Date & time Scheduled power on & off Accessibility

Nabídka Nastavení

natural_image Red and black toolbar with white icons representing audio, sound, video, pause, and person (no text or symbols)

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic

- with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 (“Code of Electronic Communications”). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;

- with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Nimity SMP40-200 - Conditions of use - 1

WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract.

This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

- To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.

• To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.

- Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.

- Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.

- Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.

- This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.

- Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

- Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.

- Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.

- Avoid strong beating of or to the product.

- Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes,

in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

Yarvik smartphone manual

SAR

This product meets applicable national SAR limits of 2.0 W/kg.

For more information regarding the Specific Absorption Rate (SAR) please visit the following website: www.sar-tick.com.

When carrying the product or using it while worn on your body, either use an approved accessory such as a holster or otherwise maintain a distance of 1.5cm from the body to ensure compliance with RF exposure requirements. Note that the product may be transmitting even if you are not making a phone call.

Dimensions, specifications, images & illustrations

All dimensions, specifications, images and illustrations are subject to change without prior notice.

Yarvik Ingenia Nimity SMP40-200 - SAR - 1

facebook.com/yarvik

Yarvik Ingenia Nimity SMP40-200 - SAR - 2

twitter.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 3

youtube.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Nimity SMP40-200 - SAR - 5

Return to index

Yarvik Ingenia Nimity SMP40-200 - SAR - 6

yarvik

Register

SELECT LANGUAGE

4.3 Audio Profiles (Audio profily)

4.4 Display (Displej)

Uzamknutá obrazovka Android

Posuňte lištu uzamknutia (A) smerom doprava a odomknite smartfón. Potom prejdete na domovskú obrazovku Android.

Yarvik Ingenia Nimity SMP40-200 - Register - 1

Návrat do indexu

ES File Explor Alarma Android BCM Download prophrite LOST DIR Movie nhblog Settings Data usage Mouse... Server Audio profiles Display Storage Play Store OfficeSuite OfficeSuite 6 Reserve Site Any structures Product update A new version of OfficeSuite is

Ponuka Nastavenia

k svojmu smartfónu Yarvik môžete pripojit' viacero zariadení Bluetooth a používat' ich naraz (napr. myš a klávesnicu).

Návrat do

indexu

4.3

Audio Profiles (Audio profily)

Kliknite na „OK“ a potvrd'te ho.

natural_image Red and black interface icons including a telephone handset, speaker, microphone, pause, and user profile (no text or symbols)

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

  • France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.
  • Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic
  • with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 (“Code of Electronic Communications”). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;
  • with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.
  • Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

WEEE

Symbol

Yarvik Ingenia Nimity SMP40-200 - Conditions of use - 1

Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

- Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.

- Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

- To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.

- To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.

- Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.

- Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.

- Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.

- This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.

- Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

- Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.

- Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.

- Avoid strong beating of or to the product.

- Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

SAR

This product meets applicable national SAR limits of 2.0 W/kg.

For more information regarding the Specific Absorption Rate (SAR) please visit the following website: www.sar-tick.com.

When carrying the product or using it while worn on your body, either use an approved accessory such as a holster or otherwise maintain a distance of 1.5cm from the body to ensure compliance with RF exposure requirements. Note that the product may be transmitting even if you are not making a phone call.

Dimensions, specifications, images & illustrations

All dimensions, specifications, images and illustrations are subject to change without prior notice.

facebook.com/yarvik twitter.com/yarvikce youtube.com/yarvikce forum.yarvik.com YARVIK.COM

Yarvik Ingenia Nimity SMP40-200 - SAR - 2

Yarvik Ingenia Nimity SMP40-200 - SAR - 3

YARVIK

Indeks SELECT LANGUAGE

1 Før første brug

2 Smartphone start

3 Skærmen Android Home [Hjem]

Skærmen Android Lock [Android-lås]

Application [Application]

Skærmen Application [Application]

Yarvik Ingenia Nimity SMP40-200 - Indeks SELECT LANGUAGE - 1

Returner til indeks

4

Opsætning af

din

Yarvik

Smartphone

4.1

Menuen Settings

[Indstillinger]

Tryk på ikonet Settings [Indstillinger] I menuen Application [Applikation] for at åbne menuen Settings [Indstillinger]. I menuen Settings [Indstillinger] kan du finde indstillinger til opsætning af din Yarvik Smartphone.

Settings WIRELESS & NETWORKS SIM management

Yarvik smartphone manual

Wi-Fi Bluetooth Data usage More... DEVICE Audio profiles Display Storage Battery Apps PERSONAL Location access Security Language & input Backup & reset ACCOUNTS Google Add account SYSTEM Date & time Scheduled power on & off Accessibility

Menuen Settings [Indstillinger]

Klik på knappen "Turn on USB storage" [Aktiver USB-lagring]. Der vises et beskedvindue:

Turn on USB storage If you turn on USB storage, some applications you are using will stop and may be unavailable until you turn off USB storage. Cancel OK

Listen Local [Lokal] foldes nu ud og viser alle hukommelsesplaceringer i enheden.

natural_image Red and black interface toolbar with white icons representing audio, sound, video, pause, and person (no text or symbols)

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania,

Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic

- with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 (“Code of Electronic Communications”). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;

- with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Nimity SMP40-200 - Conditions of use - 1

WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery

provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

  • To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.
  • To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.
  • Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.
  • Turning off your Smartphone device with the power button does not disconnect the device completely from

mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.

- Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.

- This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.

- Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

- Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.

- Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.

- Avoid strong beating of or to the product.

- Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

- It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.

- This AC adapter is intended for use with the Smartphone device IT products only.

- Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

SAR

This product meets applicable national SAR limits of 2.0 W/kg.

For more information regarding the Specific Absorption Rate (SAR) please visit the following website: www.sar-tick.com.

When carrying the product or using it while worn on your body, either use an approved accessory such as a holster or otherwise maintain a distance of 1.5cm from the body to ensure compliance with RF exposure requirements. Note that the product may be transmitting even if you are not making a phone call.

Yarvik smartphone manual

Dimensions, specifications, images & illustrations

All dimensions, specifications, images and illustrations are subject to change without prior notice.

Yarvik Ingenia Nimity SMP40-200 - SAR - 1

facebook.com/yarvik

Yarvik Ingenia Nimity SMP40-200 - SAR - 2

twitter.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 3

youtube.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Nimity SMP40-200 - SAR - 5

Return to index

Yarvik Ingenia Nimity SMP40-200 - SAR - 6

YARVIK

Android-låsskärm

Applikationsskärm

Yarvik smartphone manual

Data usage More... DEVICE Audio profiles Display Storage Battery Apps PERSONAL Location access Security Language & input Backup & reset ACCOUNTS Google Add account SYSTEM Date & time Scheduled power on & off Accessibility

Telefonens knappsats.

natural_image Red and black interface icons including a telephone handset, speaker, microphone, pause, and user profile (no text or symbols)

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic - with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 ("Code of Electronic Communications"). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted; - with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Nimity SMP40-200 - Conditions of use - 1

WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

  • To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.
  • To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.
  • Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air

ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.

  • Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.
  • Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.
  • This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.
  • Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:
  • Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.
  • Turn off the Smartphone device before putting the device into a bag or a carrying case.
  • Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.
  • Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.
  • Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.
  • Avoid strong beating of or to the product.
  • Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.
  • Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.
  • Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

  • If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.
  • In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers,

hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

- It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.

- This AC adapter is intended for use with the Smartphone device IT products only.

- Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

SAR

This product meets applicable national SAR limits of 2.0 W/kg.

For more information regarding the Specific Absorption Rate (SAR) please visit the following website:

Yarvik smartphone manual

www.sar-tick.com.

When carrying the product or using it while worn on your body, either use an approved accessory such as a holster or otherwise maintain a distance of 1.5cm from the body to ensure compliance with RF exposure requirements. Note that the product may be transmitting even if you are not making a phone call.

Dimensions, specifications, images & illustrations

All dimensions, specifications, images and illustrations are subject to change without prior notice.

Yarvik Ingenia Nimity SMP40-200 - SAR - 1

facebook.com/yarvik

Yarvik Ingenia Nimity SMP40-200 - SAR - 2

twitter.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 3

youtube.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Nimity SMP40-200 - SAR - 5

Return to index

Yarvik Ingenia Nimity SMP40-200 - SAR - 6

YARVIK

Indeks SELECT LANGUAGE

Android låseskjerm

Applikasjonsskjerm

Yarvik Ingenia Nimity SMP40-200 - Indeks SELECT LANGUAGE - 1

Tilbake til indeks

Yarvik smartphone manual

Data usage More... DEVICE Audio profiles Display Storage Battery Apps PERSONAL Location access Security Language & input Backup & reset ACCOUNTS Google Add account SYSTEM Date & time Scheduled power on & off Accessibility

Innstillingsmeny

Vise Wi-Fi MAC-addressse for Yarvik Smartphone

De fleste Bluetooth-enheter krever en PIN-kode ved tilkobling. Denne koden er vanligvis 0000 eller 1234. Se bruksanvisningen for Bluetooth-enheten dersom PIN-koden er en annen. Etter du har lagt inn korrekt PIN-kode, klikk "OK".

natural_image Red and black interface icons including a telephone handset, speaker, sound wave, pause, and person (no text or symbols)

Alternativer under en telefonsamtale

Add call Start recording 1 2 3 4 5

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

  • Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic
  • with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 ("Code of Electronic
    Communications"). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;
  • with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Nimity SMP40-200 - Conditions of use - 1
WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be

used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

  • To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.
  • To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.
  • Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.
  • Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The

socket-outlet shall be installed near the equipment and shall be easily accessible.

  • Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.
  • This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.
  • Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:
  • Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.
  • Turn off the Smartphone device before putting the device into a bag or a carrying case.
  • Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.
  • Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.
  • Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.
  • Avoid strong beating of or to the product.
  • Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.
  • Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.
  • Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

- It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.

- This AC adapter is intended for use with the Smartphone device IT products only.

- Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

SAR

This product meets applicable national SAR limits of 2.0 W/kg.

For more information regarding the Specific Absorption Rate (SAR) please visit the following website: www.sar-tick.com.

When carrying the product or using it while worn on your body, either use an approved accessory such as a holster or otherwise maintain a distance of 1.5cm from the body to ensure compliance with RF exposure requirements. Note that the product may be transmitting even if you are not making a phone call.

Yarvik smartphone manual

Dimensions, specifications, images & illustrations

All dimensions, specifications, images and illustrations are subject to change without prior notice.

Yarvik Ingenia Nimity SMP40-200 - SAR - 1

facebook.com/yarvik

Yarvik Ingenia Nimity SMP40-200 - SAR - 2

twitter.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 3

youtube.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Nimity SMP40-200 - SAR - 5

Return to index

Yarvik Ingenia Nimity SMP40-200 - SAR - 6

YARVIK

Kazalo SELECT LANGUAGE

Zaklenjeni zaslon Android

Zaslon aplikacij

Yarvik Ingenia Nimity SMP40-200 - Kazalo SELECT LANGUAGE - 1

Vrni se na

kazalo

Nastavitev

4

vašega

pametnega

telefona Yarvik

4.1

Meni Settings

(Nastavitve)

Yarvik smartphone manual

Wi-Fi Bluetooth Data usage More... DEVICE Audio profiles Display Storage Battery Apps PERSONAL Location access Security Language & input Backup & reset ACCOUNTS Google Add account SYSTEM Date & time Scheduled power on & off Accessibility

Meni nastavitev

Pritisnite "Advanced" ("Napredno") v odvitem meniju.

Ethernetni naslov vašega Wi-Fi se prikaže na naslednjem zaslonu "Advanced Wi-Fi" ("Napredno Wi-Fi") pod "MAC address" ("Ethernetni naslov").

Bluetooth

Večina naprav Bluetooth zahteva pin kodo za povezavo. Ta koda je običajno 0000 ali 1234. Če je koda PIN drugačna, glejte navodila za uporabo svoje naprave Bluetooth.

Ko ste vnesli ustrezno pin kodo, pritisnite "OK" ("V redu").

Kliknite gumb "Turn on USB storage" ("Vklopi pomnilnik USB"). Pojavilo s ebo naslednje opozorilno okno:

Turn on USB storage If you turn on USB storage, some applications you are using will stop and may be unavailable until you turn off USB storage. Cancel OK

Za potrditev kliknite "OK" ("V redu").

natural_image Red and black interface icons including a telephone handset, speaker, sound wave, pause, and user profile (no text or symbols)

Možnosti med telefonskim klicem
Add call Start recording 1 2 3 4 5

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

  • Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic
  • with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 (“Code of Electronic Communications”). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;
  • with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Nimity SMP40-200 - Conditions of use - 1

WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

  • To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.
  • To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.
  • Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.
  • Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.
  • Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.
  • This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.
  • Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:
  • Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.
  • Turn off the Smartphone device before putting the device into a bag or a carrying case.
  • Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.
  • Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.
  • Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.
  • Avoid strong beating of or to the product.
  • Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.
  • Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.
  • Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

- It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.

- This AC adapter is intended for use with the Smartphone device IT products only.

- Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it

Yarvik smartphone manual

becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

SAR

This product meets applicable national SAR limits of 2.0 W/kg.

For more information regarding the Specific Absorption Rate (SAR) please visit the following website: www.sar-tick.com.

When carrying the product or using it while worn on your body, either use an approved accessory such as a holster or otherwise maintain a distance of 1.5cm from the body to ensure compliance with RF exposure requirements. Note that the product may be transmitting even if you are not making a phone call.

Dimensions, specifications, images & illustrations

All dimensions, specifications, images and illustrations are subject to change without prior notice.

Yarvik Ingenia Nimity SMP40-200 - SAR - 1

facebook.com/yarvik

Yarvik Ingenia Nimity SMP40-200 - SAR - 2

twitter.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 3

youtube.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 4

forum.yarvik.com

YARVIK.COM

Return to index

Yarvik Ingenia Nimity SMP40-200 - SAR - 5

Yarvik Ingenia Nimity SMP40-200 - SAR - 6

Sadržaj

SELECT LANGUAGE

1 Prije prve uporabe

2 Pokretanje pametnog telefona

3 Androidov početni zaslon

3.1 Dodavanje malih programa i prečaca na početni zaslon

3.2 Postavljanje tapete

3.3 Izbornik s Apps (Aplikacije)

Androidov zaključani zaslon

Kako biste otključali telefon, prstom kliznite kvadratić (A) udesno. Nakon toga će Vam se prikazati Androidov početni zaslon.

Yarvik Ingenia Nimity SMP40-200 - Sadržaj - 1

Povratak na sadržaj

3 Androidov početni zaslon

Yarvik smartphone manual

Google Play Store - Microsoft FBReader ES File Explor 1 2 3 11:41 AM 4 5 6

Androidov početni zaslon

Zaslon s aplikacijama

Yarvik Ingenia Nimity SMP40-200 - Androidov početni zaslon - 2

Povratak na sadržaj

Podešavanje 4 Yarvik pametnog telefona Izbornik s 4.1 Settings (Postavke)

Kako biste otvorili izbornik s postavkama, u izborniku s aplikacijama pritisnite ikonu Settings (Postavke) U izborniku Settings (Postavke) možete vidjeti opcije za podešavanje Yarvik telefona.

Settings WIRELESS & NETWORKS SIM management

Yarvik smartphone manual

Wi-Fi Bluetooth Data usage More... DEVICE Audio profiles Display Storage Battery Apps PERSONAL Location access Security Language & input Backup & reset ACCOUNTS Google Add account SYSTEM Date & time Scheduled power on & off Accessibility

Izbornik postavki

U prikazanom izborniku pritisnite „Advanced“ („Napredno“).

Vaša bežična MAC adresa prikazana je na sljedećem zaslonu „Advanced Wi-Fi“ („Napredna bežična mreža“) pod „MAC address“ („MAC adresa“).

Bluetooth

Vaš Yarvik telefon opremljen je ugrađenim Bluetooth modulom za povezivanje s Bluetooth kompatibilnim perifernim uređajima, kao što su tipkovnice, zvučnici i slušalice, ali i Bluetooth handsfree slušalice i audio sustavi u automobilima.

Povucite tipku Bluetooth On/Off (Uklj/Iskl) na „On“ („Uklj“) aktivirate Bluetooth.

Kliknite na gumb „Turn on USB storage“ („Uključi USB pohranu“).

Kliknite na „OK“ za potvrdu.

Otvara se popis Local (Lokalno) koji pokazuje sve memorijske lokacije uređaja.

MicroSD obično se nalazi pri dnu mogućnosti na popisu Lokalno, pod nazivu external_sd (vanjski_sd) u primjeru u nastavku:

Fast Access Favorite Local Home Device Download sdcard external_sd usb_storage Alarms Download Notifications

Imajte na umu da se naziv MicroSD kartice može razlikovati. Vaš uređaj može koristiti i druge nazive poput sd-ext or ext-sd.

Prikaz ikona aplikacija može se promijenit bez prethodne najave.

Yarvik Ingenia Nimity SMP40-200 - Bluetooth - 2

Povratak na sadržaj

6 Telefonski pozivi

Pozivanje

Kako biste telefonirali na svom Yarvik pametnom telefonu, otvorite aplikaciju „Phone“ („Telefon“) na izborniku

Yarvik Ingenia Nimity SMP40-200 - Pozivanje - 1

s aplikacijama ili na početnom zaslonu Androida:

Pomoću numeričke tipkovnice unesite telefonski broj.

1 _QQ_ 2 _ABC_ 3 _DEF_ 4 _GHI_ 5 _JKL_ 6 _MNO_ 7 _PQRS_ 8 _TUV_ 9 _WXYZ_ * 0 + # #

Tipkovnica telefona.

natural_image Red and black interface toolbar with white icons representing audio, sound, video, pause, and person (no text or symbols)

1 -Prikaži tipkovnicu telefona (npr. za tonske opcije izbornika);
2 -Omogući/onemogući funkciju zvučnika;
3 -lsključi mikrofon;
4 -Stavi poziv na čekanje;
5 -Izbornik s više mogućnosti: dodaj još jedan telefonski poziv (konferencijski poziv) ili snimi telefonski poziv.

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

  • France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.
  • Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic - with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 ("Code of Electronic Communications"). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;
  • with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.
  • Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Nimity SMP40-200 - Conditions of use - 1
WEEE
Symbol
Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

- Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.

- Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

• To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.

- To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.

- Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.

- Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.

- Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.

- This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.

- Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

- Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.

- Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.

- Avoid strong beating of or to the product.

- Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

- It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.

- This AC adapter is intended for use with the Smartphone device IT products only.

- Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

SAR

This product meets applicable national SAR limits of 2.0 W/kg.

For more information regarding the Specific Absorption Rate (SAR) please visit the following website:

www.sar-tick.com.

When carrying the product or using it while worn on your body, either use an approved accessory such as a holster or otherwise maintain a distance of 1.5cm from the body to ensure compliance with RF exposure requirements. Note that the product may be transmitting even if you are not making a phone call.

Dimensions, specifications, images & illustrations

All dimensions, specifications, images and illustrations are subject to change without prior notice.

Yarvik Ingenia Nimity SMP40-200 - SAR - 1

facebook.com/yarvik

twitter.com/yarvikce

youtube.com/yarvikce

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Nimity SMP40-200 - SAR - 2

Yarvik Ingenia Nimity SMP40-200 - SAR - 3

Tárgymutató

Yarvik Ingenia Nimity SMP40-200 - Tárgymutató - 1

SELECT LANGUAGE

Yarvik smartphone manual

Wi-Fi Bluetooth Data usage More... DEVICE Audio profiles Display Storage Battery Apps PERSONAL Location access Security Language & input Backup & reset ACCOUNTS Google Add account SYSTEM Date & time Scheduled power on & off Accessibility

Beállítások menü

natural_image Red and black interface icons including a telephone handset, speaker, microphone, pause, and speaker symbol (no text or labels)

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

  • France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.
  • Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic
  • with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 (“Code of Electronic Communications”). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;
  • with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.
  • Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Nimity SMP40-200 - Conditions of use - 1
WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local

government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

Yarvik Ingenia Nimity SMP40-200 - Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems) - 1

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

  • To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.
  • To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.
  • Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.
  • Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.
  • Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.
  • This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.
  • Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:
  • Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.
  • Turn off the Smartphone device before putting the device into a bag or a carrying case.
  • Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.
  • Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.
  • Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.
  • Avoid strong beating of or to the product.
  • Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.
  • Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.
  • Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

SAR

This product meets applicable national SAR limits of 2.0 W/kg.

For more information regarding the Specific Absorption Rate (SAR) please visit the following website:

www.sar-tick.com.

When carrying the product or using it while worn on your body, either use an approved accessory such as a holster or otherwise maintain a distance of 1.5cm from the body to ensure compliance with RF exposure requirements. Note that the product may be transmitting even if you are not making a phone call.

Dimensions, specifications, images & illustrations

All dimensions, specifications, images and illustrations are subject to change without prior notice.

Yarvik Ingenia Nimity SMP40-200 - SAR - 1

facebook.com/yarvik

Yarvik Ingenia Nimity SMP40-200 - SAR - 2

twitter.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 3

youtube.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Nimity SMP40-200 - SAR - 5

Return to index

Yarvik Ingenia Nimity SMP40-200 - SAR - 6

yarvik

Индекс

SELECT LANGUAGE

Екран Приложения

Yarvik Ingenia Nimity SMP40-200 - Индекс - 1

Връщане към индекса

4

Настройка на

вашия

смартфон

Yarvik

4.1

Меню Settings (Настройки)

Меню настройки

natural_image Red and black interface icons including a telephone handset, speaker, sound, pause, and user profile (no text or symbols)

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

  • Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic
  • with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 (“Code of Electronic Communications”). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;
  • with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Nimity SMP40-200 - Conditions of use - 1

WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

- Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.

- Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

- To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.

- To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.

- Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.

- Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.

- Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.

- This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.

- Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

- Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.

- Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.

- Avoid strong beating of or to the product.

- Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

SAR

This product meets applicable national SAR limits of 2.0 W/kg.

For more information regarding the Specific Absorption Rate (SAR) please visit the following website: www.sar-tick.com.

When carrying the product or using it while worn on your body, either use an approved accessory such as a holster or otherwise maintain a distance of 1.5cm from the body to ensure compliance with RF exposure requirements. Note that the product may be transmitting even if you are not making a phone call.

Dimensions, specifications, images & illustrations

All dimensions, specifications, images and illustrations are subject to change without prior notice.

facebook.com/yarvik twitter.com/yarvikce youtube.com/yarvikce forum.yarvik.com YARVIK.COM

Yarvik Ingenia Nimity SMP40-200 - SAR - 2

Yarvik Ingenia Nimity SMP40-200 - SAR - 3

Yarvik Ingenia Nimity SMP40-200 - SAR - 4

Cuprins

SELECT

LANGUAGE

Ecran de aplicații

Yarvik Ingenia Nimity SMP40-200 - Cuprins - 1

Revenire la cuprins

Yarvik smartphone manual

Bluetooth Data usage More... DEVICE Audio profiles Display Storage Battery Apps PERSONAL Location access Security Language & input Backup & reset ACCOUNTS Google Add account SYSTEM Date & time Scheduled power on & off Accessibility

Meniul Setări

natural_image Red and black toolbar with white icons representing audio, sound, playback, and user (no text or symbols)

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

  • France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.
  • Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic
  • with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 ("Code of Electronic Communications"). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;
  • with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.
  • Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Nimity SMP40-200 - Conditions of use - 1
WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

  • To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.
  • To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.
  • Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.
  • Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.
  • Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.
  • This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.
  • Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:
  • Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.
  • Turn off the Smartphone device before putting the device into a bag or a carrying case.
  • Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.
  • Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.
  • Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.
  • Avoid strong beating of or to the product.
  • Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.
  • Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.
  • Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

SAR

This product meets applicable national SAR limits of 2.0 W/kg.

For more information regarding the Specific Absorption Rate (SAR) please visit the following website:

www.sar-tick.com.

When carrying the product or using it while worn on your body, either use an approved accessory such as a holster or otherwise maintain a distance of 1.5cm from the body to ensure compliance with RF exposure requirements. Note that the product may be transmitting even if you are not making a phone call.

Dimensions, specifications, images & illustrations

All dimensions, specifications, images and illustrations are subject to change without prior notice.

Yarvik Ingenia Nimity SMP40-200 - SAR - 1

facebook.com/yarvik

Yarvik Ingenia Nimity SMP40-200 - SAR - 2

twitter.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 3

youtube.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Nimity SMP40-200 - SAR - 5

Return to index

Yarvik Ingenia Nimity SMP40-200 - SAR - 6

yarvik

Указатель

SELECT

LANGUAGE

4.8 Date & time (Дата и

время)

Yarvik smartphone manual

Экран приложений

Yarvik Ingenia Nimity SMP40-200 - время) - 1

Вернуться к

указателю

Меню настроек

natural_image Red and black interface icons including a telephone handset, speaker, sound wave, pause, and user profile (no text or symbols)

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

  • France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.
  • Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic
  • with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 (“Code of Electronic Communications”). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;
  • with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.
  • Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Nimity SMP40-200 - Conditions of use - 1

WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract.

This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of

Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

  • To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.
  • To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.
  • Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.
  • Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.
  • Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.
  • This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.
  • Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:
  • Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.
  • Turn off the Smartphone device before putting the device into a bag or a carrying case.
  • Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.
  • Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.
  • Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.
  • Avoid strong beating of or to the product.

  • Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

  • Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.
  • Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

  • If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.
  • In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.
  • If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.
  • Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.
  • If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

SAR

This product meets applicable national SAR limits of 2.0 W/kg.

For more information regarding the Specific Absorption Rate (SAR) please visit the following website: www.sar-tick.com.

When carrying the product or using it while worn on your body, either use an approved accessory such as a holster or otherwise maintain a distance of 1.5cm from the body to ensure compliance with RF exposure requirements. Note that the product may be transmitting even if you are not making a phone call.

Dimensions, specifications, images & illustrations

All dimensions, specifications, images and illustrations are subject to change without prior notice.

Yarvik Ingenia Nimity SMP40-200 - SAR - 1

facebook.com/yarvik

Yarvik Ingenia Nimity SMP40-200 - SAR - 2

twitter.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 3

youtube.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Nimity SMP40-200 - SAR - 5

Yarvik Ingenia Nimity SMP40-200 - SAR - 6

yarvik

Покажчик

SELECT

LANGUAGE

Екран програм

Yarvik Ingenia Nimity SMP40-200 - Покажчик - 1

Назад до

покажчика

Налаштування

4 смартфону Yarvik

Yarvik smartphone manual

Bluetooth Data usage More... DEVICE Audio profiles Display Storage Battery Apps PERSONAL Location access Security Language & input Backup & reset ACCOUNTS Google Add account SYSTEM Date & time Scheduled power on & off Accessibility

Меню налаштувань

natural_image Red and black interface icons including a telephone handset, speaker, sound, pause, and user profile (no text or symbols)

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

  • France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.
  • Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic
  • with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 (“Code of Electronic Communications”). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;
  • with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.
  • Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Nimity SMP40-200 - Conditions of use - 1

Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

- Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.

- Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

- To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.

- To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.

- Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.

- Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.

- Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.

- This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.

- Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

- Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.

- Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.

- Avoid strong beating of or to the product.

- Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

SAR

This product meets applicable national SAR limits of 2.0 W/kg.

For more information regarding the Specific Absorption Rate (SAR) please visit the following website: www.sar-tick.com.

When carrying the product or using it while worn on your body, either use an approved accessory such as a holster or otherwise maintain a distance of 1.5cm from the body to ensure compliance with RF exposure requirements. Note that the product may be transmitting even if you are not making a phone call.

Dimensions, specifications, images & illustrations

All dimensions, specifications, images and illustrations are subject to change without prior notice.

facebook.com/yarvik twitter.com/yarvikce youtube.com/yarvikce forum.yarvik.com YARVIK.COM

Yarvik Ingenia Nimity SMP40-200 - SAR - 2

Yarvik Ingenia Nimity SMP40-200 - SAR - 3

yarvik

Ευρετήριο

SELECT

LANGUAGE

Οθόνη Εφαρμογών

Settings WIRELESS & NETWORKS SIM management Wi-Fi ON Bluetooth ON Data usage More... DEVICE Audio profiles Display Storage Battery Apps PERSONAL Location access Security Language & input Backup & reset ACCOUNTS Google Add account SYSTEM Date & time Scheduled power on & off Accessibility

natural_image Red and black interface icons including a telephone handset, speaker, microphone, pause, and person (no text or symbols)

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic - with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 ("Code of Electronic Communications"). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted; - with respect to the supply to the public of the WLAN access to telecom networks and services, by the

Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Nimity SMP40-200 - Conditions of use - 1
WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
    • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

• To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.

• To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.

- Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.

- Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.

- Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.

- This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.

- Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

  • Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.
  • Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.
  • Avoid strong beating of or to the product.
  • Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.
  • Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.
  • Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for

any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

SAR

This product meets applicable national SAR limits of 2.0 W/kg.

For more information regarding the Specific Absorption Rate (SAR) please visit the following website: www.sar-tick.com.

When carrying the product or using it while worn on your body, either use an approved accessory such as a holster or otherwise maintain a distance of 1.5cm from the body to ensure compliance with RF exposure requirements. Note that the product may be transmitting even if you are not making a phone call.

Dimensions, specifications, images & illustrations

All dimensions, specifications, images and illustrations are subject to change without prior notice.

Yarvik smartphone manual

Yarvik Ingenia Nimity SMP40-200 - SAR - 1

facebook.com/yarvik

Yarvik Ingenia Nimity SMP40-200 - SAR - 2

twitter.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 3

youtube.com/yarvikce

Yarvik Ingenia Nimity SMP40-200 - SAR - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Nimity SMP40-200 - SAR - 5

Return to index

Yarvik Ingenia Nimity SMP40-200 - SAR - 6

YARVIK

SELECT LANGUAGE

1
2_
3 Android
3.1
3.2
3.3
4
4.1
4.2 Wi-Fi &
4.3
4.4
4.5
4.6 MicroSD
4.7
4.8
5
6
7
8
9 GNU/GPL
10 Important information

Yarvik smartphone manual

Yarvik.

Yarvik!

:

- Yarvik .

.

.

.

.

.

.

- Yarvik .

.

Yarvik.

.

.

Yarvik Ingenia Nimity SMP40-200 - SELECT LANGUAGE - 1

2

Yarvik.

3-2.

Android.

Yarvik smartphone manual

11:40 AM TUE, AUGUST 6 Charged A NO SIM CARD – EMERGENCY CALLS ONLY

Android

(A) Android.

Yarvik Ingenia Nimity SMP40-200 - 2 - 2

3 Android

Yarvik smartphone manual

Google Play Store - Microsoft FBReader ES File Explor 1 2 3 11:41 AM 4 5 6

Android

.

.

1 - Wi-Fi

2 - SIM1 SIM2

3 -

4 -

5 - )

6 -

Yarvik smartphone manual

ES File Explor Alarms Android BCM Download goophera LOST DIR Movies mblag Settings Extra usage Mouse... Device Audio profiles Display Storage Play Store OfficeSuite OfficeSuite 6 Bourant files My Documents Product update A new version of OfficeSuite is

"Remove from list" ().

Yarvik Ingenia Nimity SMP40-200 - Android - 3

3.1

Yarvik Ingenia Nimity SMP40-200 - 3.1 - 1

"Apps" "Widgets". "Widgets").

Yarvik Ingenia Nimity SMP40-200 - 3.1 - 2

"Apps" "Widgets". "Apps".

"Remove" (.

Yarvik Ingenia Nimity SMP40-200 - 3.1 - 3

Yarvik Ingenia Nimity SMP40-200 - 3.1 - 4

"Select Wallpaper from" (). "Live Wallpapers" ("Gallery" ("Wallpapers" ().

Yarvik Ingenia Nimity SMP40-200 - 3.1 - 5

Yarvik Ingenia Nimity SMP40-200 - 3.1 - 6

Yarvik Ingenia Nimity SMP40-200 - 3.1 - 7

"Apps".

"apps".

APPS WIDGETS Browser Calculator Calendar Camera Clock Downloads Email ES File Explorer FBReader Gallery Google Mail Latitude Maps Messaging Music Navigation OfficeSuite People Phone Places Play Store Search Settings SIM Toolkit Sound Recorder Video Player

Yarvik Ingenia Nimity SMP40-200 - 3.1 - 9

4

Yarvik

4.1

Yarvik Ingenia Nimity SMP40-200 - Yarvik - 1

Yarvik.

Settings WIRELESS & NETWORKS SIM management Wi-Fi Bluetooth Data usage More... DEVICE Audio profiles Display Storage Battery Apps PERSONAL Location access Security Language & input Backup & reset ACCOUNTS Google Add account SYSTEM Date & time Scheduled power on & off Accessibility

:

Yarvik Ingenia Nimity SMP40-200 - Yarvik - 3

4.2 Wi-Fi &

Wi-Fi

Wi-Fi.

On/Off "On" Wi-Fi.

WiFi Yarvik Connected Yarvik Support Secured with WPA/WPA2 (protected network available)

Wi-Fi.

"Connect" (.

"Connected" (.

Mac Wi-Fi Yarvik

Wi-Fi.

Scan WPS Pin Entry Wi-Fi Direct Advanced

"Advanced".

Mac Wi-Fi "Advanced Wi-Fi" "MAC address".

Yarvik.

Bluetooth On/Off "On".

Yarvik "Search for Devices".

"pairing mode".

"Available Devices"():

SMP53-210 Not visible to other Bluetooth devices AVAILABLE DEVICES TOUCH TO PAIR BT-001 Pairing...

Yarvik.

"Bluetooth pairing request" ().

SMP53-210 Not visible to other Bluetooth devices AVAILABLE TOUCH TO PAIR BEIJFES Bluetooth pairing request From: BT-001 Pair with this device? Cancel Pair

PIN 12340000 PIN .

PIN "OK".

Yarvik "Connected" ("Available Devices")():

BT-001 Connected

Yarvik).

Yarvik Ingenia Nimity SMP40-200 - Mac Wi-Fi Yarvik - 5

4.3

Yarvik Ingenia Nimity SMP40-200 - Mac Wi-Fi Yarvik - 6

Yarvik Ingenia Nimity SMP40-200 - Mac Wi-Fi Yarvik - 7

Yarvik Ingenia Nimity SMP40-200 - Mac Wi-Fi Yarvik - 8

Yarvik Ingenia Nimity SMP40-200 - Mac Wi-Fi Yarvik - 9

Yarvik. "Uninstall" (). ).

Yarvik Ingenia Nimity SMP40-200 - Mac Wi-Fi Yarvik - 10

Yarvik Ingenia Nimity SMP40-200 - Mac Wi-Fi Yarvik - 11

Yarvik Mac USB

Yarvik Mac USB. MicroSD.

Yarvik USB USB USB Yarvik .

USB connected Select to copy files to/from your computer. USB debugging connected Select to disable USB debugging.

:

Yarvik smartphone manual

USB Mass Storage USB connected You have connected to your computer via USB. Touch the button below if you want to copy files between your computer and your Android's SD card. Turn on USB storage

"Turn on USB storage" (USB).

:

Turn on USB storage If you turn on USB storage, some applications you are using will stop and may be unavailable until you turn off USB storage. Cancel OK

"OK".

Yarvik Yarvik.

MicroSD.

"Turn off USB storage" (USB) USB.

Yarvik.

Yarvik Ingenia Nimity SMP40-200 - Yarvik Mac USB - 4

MicroSD

ES File Explorer

ES File Explorer Local "Fast Access".

Fast Access Favorite Local Library Network Tools Alarm LOST.D

Local . microSD external_sd :

Fast Access Favorite Local Home Device Download sdcard external_sd usb_storage Alarms Download Notifications

MicroSD . sd-ext sd-ext.

USB USB / usb_storage().

Yarvik Ingenia Nimity SMP40-200 - Yarvik Mac USB - 7

4.7

"Select language" (Yarvik.

"Android keyboard".

Yarvik Ingenia Nimity SMP40-200 - 4.7 - 1

4.8

Yarvik.

Yarvik Ingenia Nimity SMP40-200 - 4.8 - 1

5

Yarvik ):

APPS WIDGETS Browser Calculator Calendar Camera Clock Downloads Email ES File Explorer FBReader Gallery Google Mail Latitude Maps Messaging Music Navigation OfficeSuite People Phone Places Play Store Search Settings SIM Toolkit Sound Recorder Video Player

Yarvik Ingenia Nimity SMP40-200 - 5 - 2

Yarvik Ingenia Nimity SMP40-200 - 5 - 3

Yarvik "Phone" Android :

Yarvik Ingenia Nimity SMP40-200 - 5 - 4

1 qD 2 ABC 3 DEF 4 GHI 5 JKL 6 MNO 7 PQRS 8 TUV 9 WXYZ * 0 + #

0"+".

Yarvik Ingenia Nimity SMP40-200 - 5 - 6

Yarvik Ingenia Nimity SMP40-200 - 5 - 7

"People".

Call Log Log .

"People"

Yarvik 3:

Yarvik Ingenia Nimity SMP40-200 - 5 - 8

natural_image Red and black interface icons including a speaker, microphone, pause, and person (no text or symbols)

Add call Start recording 1 2 3 4 5

Caller ID/ Call waiting

Caller ID Yarvik.

"Phone"

Yarvik Ingenia Nimity SMP40-200 - Caller ID/ Call waiting - 1

Yarvik Ingenia Nimity SMP40-200 - Caller ID/ Call waiting - 2

"Settings" - "Voice call" - "Additional settings" - "Caller ID".

Yarvik Ingenia Nimity SMP40-200 - Caller ID/ Call waiting - 3

Yarvik Ingenia Nimity SMP40-200 - Caller ID/ Call waiting - 4

Yarvik SMS MMS. .

SMS/MMS

"Messaging"

Yarvik Ingenia Nimity SMP40-200 - SMS/MMS - 1

Android.

Yarvik smartphone manual

yarvik yarvik Type text message

Yarvik "Phone" Android : 1 "Add number" (.

Yarvik Ingenia Nimity SMP40-200 - SMS/MMS - 4

8

Yarvik 2 Yarvik Yarvik .

Yarvik.

Yarvik Yarvik.

Yarvik www.yarvik.com

Yarvik Yarvik www.yarvik.com, Yarvik.

Yarvik Ingenia Nimity SMP40-200 - 8 - 1

9 GNU/GPL

Yarvik Settings - About Smartphone - Legal information ( http://source.android.com/source/licenses.html .

Yarvik Ingenia Nimity SMP40-200 - GNU/GPL - 1

10 Important Information

Wireless LAN-Regulatory information

Yarvik Ingenia Nimity SMP40-200 - Wireless LAN-Regulatory information - 1

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

  • France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.
  • Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic
  • with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 (“Code of Electronic Communications”). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;
  • with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.
  • Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Nimity SMP40-200 - Conditions of use - 1

Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

- Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.

- Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

- To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.

- To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.

- Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.

- Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.

- Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.

- This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.

- Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

- Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.

- Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.

- Avoid strong beating of or to the product.

- Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

SAR

This product meets applicable national SAR limits of 2.0 W/kg.

For more information regarding the Specific Absorption Rate (SAR) please visit the following website: www.sar-tick.com.

When carrying the product or using it while worn on your body, either use an approved accessory such as a holster or otherwise maintain a distance of 1.5cm from the body to ensure compliance with RF exposure requirements. Note that the product may be transmitting even if you are not making a phone call.

Dimensions, specifications, images & illustrations

All dimensions, specifications, images and illustrations are subject to change without prior notice.

facebook.com/yarvik twitter.com/yarvikce youtube.com/yarvikce forum.yarvik.com YARVIK.COM

Yarvik Ingenia Nimity SMP40-200 - SAR - 2

Table of contents Click a title to access it
Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : Yarvik

Model : Ingenia Nimity SMP40-200

Category : Smartphone