Yarvik Ingenia Horizon SMP 50-201 - Smartphone

Ingenia Horizon SMP 50-201 - Smartphone Yarvik - Free user manual and instructions

Find the device manual for free Ingenia Horizon SMP 50-201 Yarvik in PDF.

📄 530 pages English EN Download 💬 AI Question 10 questions ⚙️ Specs
Notice Yarvik Ingenia Horizon SMP 50-201 - page 3
Pick your language and provide your email: we'll send you a specifically translated version.
Product Type Smartphone
Brand Yarvik
Model Ingenia Horizon SMP 50-201
Operating System Android
Touchscreen Yes
Cellular network Dual SIM
Wi-Fi Yes
Bluetooth Yes
External storage MicroSD
USB connectivity Yes (mass storage)
Battery Rechargeable (use after purchase recommended)
Main functions Phone calls, SMS/MMS messaging
Maintenance and cleaning Slightly water-dampened cotton cloth
Safety Avoid shocks, humidity, dust, magnetic fields, extreme temperatures
Warranty 2 years (material and manufacturing defects)

Frequently Asked Questions - Ingenia Horizon SMP 50-201 Yarvik

How to unlock the screen of my Yarvik Ingenia Horizon?
Slide the lock bar to the right on the Android lock screen to access the home screen.
How to add a widget to the home screen?
Press the applications and widgets button at the bottom middle of the home screen, then on 'Widgets', long-press the desired widget and drop it on an empty spot.
How to change the wallpaper?
Long-press the home screen until the 'Select Wallpaper from' menu appears. Choose from live wallpapers, gallery, or default still images.
How to connect my smartphone to a Wi-Fi network?
Go to settings, enable Wi-Fi, select the desired network from the list, enter the security key if needed, and press 'Connect'.
How to pair a Bluetooth device?
Enable Bluetooth in settings, your smartphone will search for devices. Select the detected device, enter the PIN code (often 0000 or 1234), and confirm.
How to transfer files to a computer via USB?
Plug in the USB cable, a notification 'USB connected' appears. Click on it, then on 'Turn on USB storage'. The internal memory and microSD will appear as drives on the computer.
How to access the MicroSD card?
Open the ES File Explorer app, go to favorites, click on '/', then on 'mnt' and 'sdcard2' for the MicroSD card.
How to make a phone call?
Open the 'Phone' app, use the numeric keypad to dial the number, press the call key. For an international call, hold '0' until you get '+'.
How to set up voicemail?
In the 'Phone' app, press and hold the '*' key, select 'Add number', then enter your voicemail access number in the settings.
How to clean my Yarvik smartphone?
Use a slightly water-dampened cotton cloth. Do not use any cleaning products and avoid getting the device wet.

User questions about Ingenia Horizon SMP 50-201 Yarvik

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Smartphone in PDF format for free! Find your manual Ingenia Horizon SMP 50-201 - Yarvik and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. Ingenia Horizon SMP 50-201 by Yarvik.

USER MANUAL Ingenia Horizon SMP 50-201 Yarvik

1 Prior to first use

2 Smartphone Startup

3 Android Home Screen

3.1 Adding widgets and shortcuts to your Home Screen

3.2 Setting a Wallpaper

3.3 Application Menu

4 Setting up your Smartphone

4.1 Settings Menu

4.2 WiFi & Bluetooth

4.3 Audio Profiles

4.4 Display

4.5 Apps

4.6 Storage & MicroSD memory Access

4.7 Language & input

4.8 Date & time

5 Apps

6 Phone Calls

7 Messaging

8 Warranty Statement

9 GNU/GPL Licensing Info

10 Important

Information

1 Prior to first use

Dear user,

Thank you for purchasing our product.

To ensure you a quick and convenient use of your new Yarvik Smartphone, please read these instructions carefully prior to use.

We hope you will absolutely enjoy your Yarvik Smartphone for the longest time possible!

Please note:

- Your Yarvik Smartphone is a high precision electronic product, do not try to disassemble the Smartphone, as this will void your warranty and may result in malfunctioning of the device;

- Avoid strong beating of or to the product;

- Avoid using the Smartphone in a high or low temperature environment, or in any environment where the device can get in contact with moisture, dust or magnetic fields;

- Do not expose the Smartphone to strong sunlight for an extended period of time;

- Don't operate the touch screen of the Smartphone with sharp objects, as this may result in scratching the screen surface;

- Using connected headphones on the Smartphone for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage;

Yarvik smartphone manual

  • Do not cross the road, drive a motor vehicle or bicycle while using the Smartphone with headphones to avoid traffic accidents;
  • Only use permitted batteries, chargers and accessories with your Yarvik Smartphone. The use of any other products with the Smartphone can be dangerous and may violate the warranty regulations;
  • Only use a slightly wet cotton cloth to clean the Smartphone, and only use water to wetten the cotton cloth. The Smartphone should not be cleaned with any sort of (glass) cleaning aid.

You may go ahead and use your Yarvik Smartphone right out of the box, without charging the battery first. It is best for the battery to first run on the charge left in it, and to be fully recharged once it's completely drained for the first time.

If the Smartphone isn't switching on right out of the box, the battery is already completely drained and you should of course recharge it first.

Yarvik Ingenia Horizon SMP 50-201 - Yarvik smartphone manual - 1

Return to index

Yarvik Ingenia Horizon SMP 50-201 - Return to index - 1

Smartphone Startup

When you first power on your Yarvik Smartphone, you will be presented the startup sequence. The very first startup may take a while, approximately 2-3 minutes.

After the startup sequence the Smartphone has completed starting up and you will be presented the Android Lock Screen.

Yarvik smartphone manual

3:24 PM 11/22/2012 Emergency call A No SIM card|No service

Android Lock Screen

Slide the lock bar (A) to the right to unlock the Smartphone. You will then be taken to the Android Home Screen.

Yarvik Ingenia Horizon SMP 50-201 - Smartphone Startup - 2

Return to index

3 Android Home Screen

Yarvik smartphone manual

1 2 3 3:40 PM 5 4 6 7 8 9

Android Home Screen

On top of the Smartphone's screen you can always find the status bar.

The status bar displays system information, while the lower menu bar contains the function buttons.

1 - Wi-Fi Signal Indicator
2 - Cellular network reception for SIM1 and SIM2 and Battery Level Indicator
3 - System Time
4 - App Shortcuts
5 - Widget (analog clock)
6 - Back button - brings you back to the previous screen, or previous website when using the Browser
7 - Home - brings you back to the Android Home Screen
8 - App and widget menu
9 - Multitask button

The home screen consists of multiple pages which can be accessed by swiping the home screen left/right.

To see what apps are running in the background, you can access the multitasking view by pressing the multitask button (9).

Calendar Clock Downloads 7 8 9 4 5 6 December 2012. 3:50 Downloads

Click on a running app in the multitask view to quickly switch to it. You can close running apps by long pressing it and clicking "Remove from list".

Yarvik Ingenia Horizon SMP 50-201 - Android Home Screen - 3

Return to index

3.1

Adding widgets and

shortcuts to

your

Home Screen

To add a widget, press the app and widget button in the bottom center of your Home Screen:

Yarvik Ingenia Horizon SMP 50-201 - Home Screen - 1

In the following screen, you can find all the installed apps and widgets, both separately viewable by pressing "Apps" or "Widgets" on top of the screen respectively.

Press "Widgets" to view all available widgets. When showing all widgets, you can swipe the screen to browse to the next page (if available).

Press and hold the desired widget to have the Home Screen show up and release the widget to any empty spot on the home screen.

To add a shortcut to any app, press the app and widget button in the bottom center of your Home Screen:

Yarvik Ingenia Horizon SMP 50-201 - Home Screen - 2

In the following screen, you can find all the installed apps and widgets, both separately viewable by pressing "Apps" or "Widgets" on top of the screen respectively.

Press "Apps" to view all installed apps.

Press and hold the desired app to have the home screen show up and release the shortcut to any empty spot on the Home Screen.

To remove widgets and/or app shortcuts from your Home Screen, press and hold them and drag them to the appeared "Remove" dustbin icon on top of your Home Screen.

Yarvik Ingenia Horizon SMP 50-201 - Home Screen - 3

Return to index

3.2

Setting a Wallpaper

To change the Home Screen wallpaper, press and hold the Home Screen until the “Select Wallpaper from” menu comes up.

You can choose from "Live Wallpapers" (animated wallpapers), "Gallery" (photo/video gallery) or "Wallpapers" (default static images).

Yarvik Ingenia Horizon SMP 50-201 - Setting a Wallpaper - 1

Return to index

3.3

Application Menu

Press the app and widget button in the bottom center of your Home Screen:

Yarvik Ingenia Horizon SMP 50-201 - Application Menu - 1

When the system displays the widgets, press "Apps" to view all installed apps.

Here you can find all the pre-installed programs or "apps" as well as additional apps that you install. You can launch any app by just pressing the corresponding icon.

Yarvik smartphone manual

4:12 PM APP5 WIDGETS Browser Calculator Calendar Camera Clock Downloads Email ES File Explorer FBReader FM Radio Gallery Google Mail Latitude Maps Messaging Music Navigation OfficeSuite People Phone

Application Screen

Return to index

Setting up your Yarvik Smartphone

4.1 Settings Menu

Press the Settings icon in the Application Menu to enter the Settings menu. In the Settings menu you can find the options to set up your Yarvik Smartphone.

WIRELESS & NETWORKS SIM management Wi-Fi ON Bluetooth OFF Data usage More... DEVICE Audio profiles Display Storage

Yarvik smartphone manual

Storage Battery Apps PERSONAL Accounts & sync Location services Security Language & input Backup & reset SYSTEM Date & time Schedule power on/off Accessibility Accounts & sync Location services Security Language & input Backup & reset SYSTEM Date & time Schedule power on/off Accessibility { } Develo…

Settings Menu

We will go through the most important parts:

Yarvik Ingenia Horizon SMP 50-201 - Settings Menu - 3

Return to index

Yarvik Ingenia Horizon SMP 50-201 - Return to index - 1

WiFi & Bluetooth

Wi-Fi

Set up a connection with a wireless Wi-Fi network.

Slide the On/Off button to "On" to activate Wi-Fi.

WiFi Yarvik Connected Yarvik Support Secured with WPA/WPA2 (protected network available)

The available Wi-Fi networks appear in the network list at the right screen. Tap the network of your choice. If the network is secured, you're prompted to enter the network security key.

Press the "Connect" button and the Smartphone is connecting to the network.

Once “Connected” appears underneath the network name and the wireless reception icon is shown in the bottom status bar, you’re successfully connected to the wireless network.

Viewing your Yarvik Smartphone's Wi-Fi MAC address

While in the Wi-Fi settings screen, click on the menu button in the bottom right corner.

Advanced SCAN ADD NETWORK

Press "Advanced" in the unfolding menu.

Your Wi-Fi MAC address is displayed in the following "Advanced Wi-Fi" screen under "MAC address".

Bluetooth

Your Yarvik Smartphone is equipped with a built-in Bluetooth module for connecting with Bluetooth compatible peripherals, like keyboards, speakers and headphones, but also with Bluetooth handsfree headsets and carkits.

Slide the Bluetooth On/Off button to "On" to activate Bluetooth.

Once activated, your Yarvik Smartphone will automatically start searching for nearby Bluetooth devices. You can always manually search for Bluetooth devices by clicking "Search for Devices" in the top right corner of the screen.

It may be required for the to be connected peripherals to be put in "pairing mode". Please refer to the instructions manual of the concerning peripherals for this.

All discovered devices will appear in the "Available Devices" list:

SMP53-210 Not visible to other Bluetooth devices AVAILABLE DEVICES TOUCH TO PAIR BT-001 Pairing...

Click on the discovered Bluetooth device to pair your Yarvik Smartphone with it.

The "Bluetooth pairing request" window will appear:

SMP53-210 Not visible to other Bluetooth devices AVAILABLE TOUCH TO PAIR BEVICES Bluetooth pairing request From: BT-001 Pair with this device? Cancel Pair

Most Bluetooth devices require a pin code to connect. This code usually is 0000 or 1234. Please refer to the instructions manual of your Bluetooth device if the pin code is different.

After you have entered the correct pin code, press "OK".

Your Yarvik Smartphone will now start pairing with your Bluetooth device, and after a few seconds the connection will be completed, showing a "Connected" message underneath the concerning Bluetooth device in the "Available Devices" list:

BT-001 Connected

You can connect multiple Bluetooth devices to your Yarvik Smartphone for use at the same time (e.g. headset and keyboard).

Yarvik Ingenia Horizon SMP 50-201 - Bluetooth - 4

4.3 Audio Profiles

Here you can change the audio volume of the Smartphone, like only vibration or vibration and ring notification for incoming calls/messages.

Yarvik Ingenia Horizon SMP 50-201 - Audio Profiles - 1

4.4 Display

Here you can change the brightness of the display, font sizes and the auto sleep time.

Please note that the higher the display brightness, the higher the energy consumption. This will drain your battery substantially faster.

If you don't want the display to auto rotate as you tilt the Smartphone, you can enable/disable this functionality in the Auto-rotate screen setting.

Return to index

4.5 Apps

Here you can manage applications that are installed on your Yarvik Smartphone.

You can click apps that you have installed to see the app info and uninstall them if needed by using the "Uninstall" button.

Please note that the preinstalled default applications (like e.g. the calculator) cannot be uninstalled.

Return to index

Storage & MicroSD memory Access 4.6

Shows you the internal memory information. When a MicroSD card is present, you can also find the memory information of the inserted card here.

Connecting your Yarvik Smartphone to a PC or Mac by USB

You can connect your Yarvik Smartphone to a PC or Mac using the provided USB cable.

When connected to a computer, you can access the Smartphone's internal memory and, if present, an inserted MicroSD card as standard USB Mass Storage Device.

Please refer to the printed Quick Start Guide of your Yarvik Smartphone to determine the location of the Smartphone's USB port. Connect the USB cable to the USB port of your Yarvik Smartphone and to a free USB port on your computer.

In the top side of your Smartphone's screen, two messages will appear shortly after each other:

USB connected Select to copy files to/from your computer. USB debugging connected Select to disable USB debugging.

Once the second message "USB connected" appears, click on it. The following screen will appear:

USB Mass Storage USB connected You have connected to your computer via USB. Touch the button below if you want to copy files between your computer and your Android's SD card. Turn on USB storage

Click on the button "Turn on USB storage". A notification window will appear:

Turn on USB storage If you turn on USB storage, some applications you are using will stop and may be unavailable until you turn off USB storage. Cancel OK

Click on "OK" to confirm.

The internal memory of your Yarvik Smartphone will now appear as Mass Storage Drive in your computer's file system, and can be used e.g. to copy files from and to your Yarvik Smartphone.

If you have a MicroSD card in your Smartphone, the card will be recognized by the computer as a second Mass Storage Drive.

To stop using the Mass Storage Device function, click on the "Turn off USB storage" button and remove the USB cable.

Yarvik smartphone manual

Note: There are no hardware drivers needed to access the Yarvik Smartphone's memory. In the case your computer prompts for any driver installation, you can simply ignore it.

Yarvik Ingenia Horizon SMP 50-201 - Connecting your Yarvik Smartphone to a PC or Mac by USB - 4

Access your MicroSD card in ES File Explorer

If you have inserted a MicroSD card in your Yarvik Smartphone, you can access its contents as following:

Open the ES File Explorer app and click on the Favorites button (with the blue star icon).

The Favorites menu now unfolds. Click on the "root" icon labeled with "/":

Local /sdcard/ Favorites Select Search Up AppMgr List Favorites Home / Downloads Pictures

You will now reach the "root" of the Smartphone's file system, containing several files and folders. Locate and click on the "mnt" folder:

Yarvik Ingenia Horizon SMP 50-201 - Access your MicroSD card in ES File Explorer - 2

The "mnt" folder now opens, showing several folders:

Local /mnt/ Favorites Select Search Up AppMgr List asec obb sdcard sdcard2 secure MicroSD Card Internal Memory

The "sdcard" folder is the internal memory of your Yarvik Smartphone.

The "sdcard2" folder is your MicroSD card (when inserted in the Smartphone's MicroSD slot).

You can, when available, also use the microsd2 shortcut in the earlier mentioned Favorites menu for quick access to your MicroSD card memory.

Yarvik Ingenia Horizon SMP 50-201 - Access your MicroSD card in ES File Explorer - 4

4.7 Language & input

Use “Select language” to select the display language of your Yarvik Smartphone. This applies to all the screen texts in the entire system.

Under "Android keyboard" you may setup the onscreen keyboard of your Smartphone.

Yarvik Ingenia Horizon SMP 50-201 - Language & input - 1

4.8 Date & time

Here you can setup the date and the time for your Yarvik Smartphone.

Yarvik Ingenia Horizon SMP 50-201 - Date & time - 1

5 Apps

The Yarvik Smartphone will come with pre-installed Apps (see below examples):

APPS WIDGETS Browser Calculator Calendar Camera Clock Downloads Email ES File Explorer FBReader FM Radio Gallery Google Mail Latitude Maps Messaging Music Navigation OfficeSuite People Phone Places Play Store Search Settings SIM Toolkit Sound Recorder Video Player

The appearance of app icons may change without prior notice.

Return to index

6 Phone Calls

Making phone calls

To make a phone call with your Yarvik Smartphone, open the "Phone" application from your application

menu or Android home screen:

Yarvik Ingenia Horizon SMP 50-201 - Making phone calls - 1

Use the numeric phone keypad to enter the telephone number.

1 QD 2 ABC 3 DEF 4 GHI 5 JKL 6 MNO 7 PORS 8 TUV 9 WXYZ * 0 + #

Phone keypad.

To make international phone calls, requiring the '+' prefix, press and hold the '0' on the keypad until the '+' appears.

Press the call handling button to engage the phone call.

Press the call handling button to disengage the phone call.

You can also make phone calls directly from your contacts from within the "People" application.

Recent calls are stored in the Call Log screen, accessible by pressing the Log button in the top of Phone screen.

Your contacts (from the earlier mentioned "People" app) can also be accessed directly from within the Phone screen by pressing the button.

Incoming phone calls

When you receive a phone call on your Yarvik Smartphone, you will be presented with 3 options:

1 2 3

1 - Slide the circle up to ignore the incoming phone call and send an automated response by text message;
2 - Ignore the incoming phone call;
3 - Answer the incoming phone call.

Options during a phone call

Add call Start recording 1 2 3 4 5

1 - Show the phone keypad (e.g. for DTMF option menu's);
2 - Enable/disable loud speaker function;
3 - Mute microphone;
4 - Put phone call on hold;
5 - Menu with more options: add an additional phone call (conversation call) or record the phone call.

Call forwarding

You can set the call forwarding feature to forward all incoming phone calls to a specific phone number.

In the "Phone" app press the menu button and select "Call settings".

Select "Voice call", in which you can choose for "Call forwarding" to adjust your forwarding options.

Caller ID/Call waiting

With the Caller ID function of your Yarvik Smartphone, you can choose whether you want to send your number along with outgoing phone calls.

To adjust this, start the "Phone" app 📋, press the menu 📋 and select "Settings" - "Voice call" - "Additional settings" - "Caller ID".

Within this same menu you can also enable/disable incoming phone calls when already engaged in a phone conversation.

Return to index

7 Messaging

Your Yarvik Smartphone is capable of sending SMS and MMS messages. Please refer to your mobile service provider for involved costs and additional costs for sending messages to or from foreign countries.

Sending SMS/MMS messages

Yarvik smartphone manual

Open the "Messaging" application your Android home screen or application menu.

Yarvik 3 Yarvik 5 160/1 6 Type message 7

Messaging application.

1 - Add attachments like pictures, audio and video's. Messages with attachment are automatically considered MMS messages;
2 - Message settings menu;
3 - Recipient field;
4 - Add recipient;
5 - Message conversation overview;
6 - Message input;
7 - Send message button.

Set voicemail number/playback voicemail messages

To set your voicemail service number in your Yarvik Smartphone, open the "Phone" application from your

application menu or Android home screen:

Yarvik Ingenia Horizon SMP 50-201 - Set voicemail number/playback voicemail messages - 1

Press and hold the 📄 on the phone keypad. The option screen "Add number" will appear. In the Voicemail options you can select the voicemail settings and enter your voicemail service number.

Once the voicemail service number has been set, you can subsequently use the button to call to your voicemail box by pressing and holding it.

Yarvik Ingenia Horizon SMP 50-201 - Set voicemail number/playback voicemail messages - 2

Yarvik Ingenia Horizon SMP 50-201 - Set voicemail number/playback voicemail messages - 3

Warranty Statement

Yarvik warrants that the product purchased by Customer shall be free from defects in workmanship or materials for a period of 2 years from the date of purchase by Customer. If, at any time during the warranty period, the product has a defect in workmanship or material, Customer should return the product to the dealer where the product has been purchased. Dealer shall repair or replace it (at Yarvik's sole option) within a reasonable period of time. An original invoice is required as proof of the purchase date. Yarvik's option with respect to this matter shall be final.

This warranty does not cover defects or malfunctions resulting from software transfers, misuse, abusive operation, tampering, negligence, improper use, insufficient care or any act beyond the control of Yarvik.

IMPORTANT: When you buy a Smartphone from Yarvik, your Smartphone will be provided to you with the latest stable firmware available for this specific model, at the time the unit was manufactured. Yarvik will not provide support to products that have otherwise been modified by the end user, nor does Yarvik support programming modifications to the firmware and software used in its products, and if any such modifications have been made, all warranties shall be automatically void.

To avoid invalidating the warranty offered hereunder, Customer should use only the official software, applications and upgrades available from Yarvik's website at www.yarvik.com.

No other software or firmware should be used, as such use will automatically void all warranties and support. Yarvik does not support the use of any software or firmware other than the software or firmware that was installed on the product by the manufacturer or that is available from Yarvik's official web site at www.yarvik.com. Yarvik explicitly declines to respond to any inquiries regarding unauthorized modifications, unauthorized software, and unauthorized firmware.

Yarvik Ingenia Horizon SMP 50-201 - Warranty Statement - 1

Return to index

Yarvik Ingenia Horizon SMP 50-201 - Return to index - 1

GNU/GPL Licensing Information

Please consult the legal information available on your Yarvik Smartphone under Settings – About Smartphone – Legal information (internet connection required) or visit http://source.android.com/source/licenses.html for more information.

Yarvik Ingenia Horizon SMP 50-201 - GNU/GPL Licensing Information - 1

Return to index

Yarvik Ingenia Horizon SMP 50-201 - Return to index - 1

Important Information

Wireless LAN-Regulatory information

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany,

Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic

- with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 (“Code of Electronic Communications”). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;

- with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Horizon SMP 50-201 - Conditions of use - 1

WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

- To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.

- To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.

- Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.

- Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.

- Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.

- This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.

- Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

- Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.

- Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.

- Avoid strong beating of or to the product.

- Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the

pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

Yarvik smartphone manual

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 1

facebook.com/yarvik

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 2

twitter.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 3

youtube.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 5

Return to index

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 6

Index

Yarvik Ingenia Horizon SMP 50-201 - Index - 1

SELECT LANGUAGE

Android Vergrendelingsscherm

Applicatiescherm

Yarvik Ingenia Horizon SMP 50-201 - SELECT LANGUAGE - 1

Terug naar index

4

Uw smartphone instellen

4.1

Instellingenmenu

Instellingenmenu

Voicemailnummer instellen/voicemailberichten afluisteren

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic - with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 ("Code of Electronic Communications"). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted; - with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Horizon SMP 50-201 - Conditions of use - 1

WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local

government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

  • To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.
  • To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.
  • Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.
  • Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.
  • Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.
  • This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.
  • Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:
  • Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.
  • Turn off the Smartphone device before putting the device into a bag or a carrying case.
  • Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.
  • Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.
  • Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.
  • Avoid strong beating of or to the product.
  • Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.
  • Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.
  • Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

- It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.

- This AC adapter is intended for use with the Smartphone device IT products only.

- Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 1

facebook.com/yarvik

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 2

twitter.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 3

youtube.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 5

Terug naar index

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 6

Inhalt

Yarvik Ingenia Horizon SMP 50-201 - Inhalt - 1

SELECT LANGUAGE

Android Sperrbildschirm

Date & time (Datum &

Uhrzeit)

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic - with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 ("Code of Electronic Communications"). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted; - with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Horizon SMP 50-201 - Conditions of use - 1

WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium

metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

  • To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.
  • To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.
  • Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.
  • Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.
  • Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.
  • This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.
  • Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:
  • Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.
  • Turn off the Smartphone device before putting the device into a bag or a carrying case.
  • Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.
  • Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.
  • Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.
  • Avoid strong beating of or to the product.
  • Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in

scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

facebook.com/yarvik twitter.com/yarvikce youtube.com/yarvikce forum.yarvik.com YARVIK.COM

Zurück zum Inhalt

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 2

Index

Yarvik Ingenia Horizon SMP 50-201 - Index - 1

SELECT LANGUAGE

Menu de configuration

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic - with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 ("Code of Electronic Communications"). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted; - with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Horizon SMP 50-201 - Conditions of use - 1

WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it

responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages

that are not covered by the guarantee.

  • To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.
  • To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.
  • Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.

- Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.

- Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.

- This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.

- Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

- Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.

- Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.

- Avoid strong beating of or to the product.

- Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an

accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

- It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.

- This AC adapter is intended for use with the Smartphone device IT products only.

- Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

Yarvik smartphone manual

This products has been certified as RoHS Compliant.

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 1

facebook.com/yarvik

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 2

twitter.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 3

youtube.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 5

Retour à l'index

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 6

Índice

Yarvik Ingenia Horizon SMP 50-201 - Índice - 1

SELECT LANGUAGE

Yarvik smartphone manual

Audio profiles Display Storage Battery Apps PERSONAL Accounts & sync Location services Security Language & input Backup & reset SYSTEM Date & time Schedule power on/off Accessibility Accounts & sync Location services Security Language & input Backup & reset SYSTEM Date & time Schedule power on/off A…

Haga clic en "OK" ("Aceptar") para confirmar.

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic - with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 ("Code of Electronic Communications"). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;

- with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Horizon SMP 50-201 - Conditions of use - 1
WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

- Yarvik is not responsible for any interference that you may experience or that may be caused when

operating this device.

- Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

- To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.

- To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.

- Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.

- Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.

- Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.

- This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.

- Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

- Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.

- Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.

- Avoid strong beating of or to the product.

- Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 1

facebook.com/yarvik

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 2

twitter.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 3

youtube.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 5

Volver al índice

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 6

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 7

Indice

SELECT LANGUAGE

4.8 Date & time (Data e

ora)

Yarvik smartphone manual

Audio profiles Display Storage Battery Apps PERSONAL Accounts & sync Location services Security Language & input Backup & reset SYSTEM Date & time Schedule power on/off Accessibility Accounts & sync Location services Security Language & input Backup & reset SYSTEM Date & time Schedule power on/off A…

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic - with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 (“Code of Electronic Communications”). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted; - with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Horizon SMP 50-201 - Conditions of use - 1

WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

- Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.

- Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

- To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.

- To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.

- Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.

- Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.

- Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.

- This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.

- Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

- Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.

- Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.

- Avoid strong beating of or to the product.

- Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

  • If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.
  • In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.
  • If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.
  • Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.
  • If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

- It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.

- This AC adapter is intended for use with the Smartphone device IT products only.

- Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

Yarvik smartphone manual

RoHS

This products has been certified as RoHS Compliant.

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 1

facebook.com/yarvik

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 2

twitter.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 3

youtube.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 5

Torna all'indice

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 6

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 7

Índice

SELECT LANGUAGE

4.8 Date & time (Data e

Hora)

Ecrã de aplicações

Voltar ao índice

4 Configurar o seu Smartphone Yarvik

Menu de definições

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

  • France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.
  • Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic - with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 ("Code of Electronic Communications"). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;
  • with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.
  • Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Horizon SMP 50-201 - Conditions of use - 1
WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

- Yarvik is not responsible for any interference that you may experience or that may be caused when

operating this device.

- Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

- To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.

- To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.

- Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.

- Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.

- Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.

- This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.

- Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

- Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.

- Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.

- Avoid strong beating of or to the product.

- Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 1

facebook.com/yarvik

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 2

twitter.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 3

youtube.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 5

Voltar ao índice

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 6

Spis treści

Yarvik Ingenia Horizon SMP 50-201 - Spis treści - 1

SELECT LANGUAGE

Ekran aplikacji

Yarvik Ingenia Horizon SMP 50-201 - Spis treści - 2

Powrót do indeksu

Menu ustawień

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic - with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 ("Code of Electronic Communications"). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;

- with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Horizon SMP 50-201 - Conditions of use - 1

WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling.

Business users should contact their supplier and check the terms and conditions of the purchase contract.

This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of

Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

- To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.

- To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.

- Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.

- Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.

- Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.

- This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.

- Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

- Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.

- Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.

- Avoid strong beating of or to the product.

- Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

facebook.com/yarvik twitter.com/yarvikce youtube.com/yarvikce forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 2

Powrót do indeksu

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 3

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 4

Rejstřík

SELECT

LANGUAGE

Obrazovka aplikací

Yarvik Ingenia Horizon SMP 50-201 - Rejstřík - 1

Návrat do rejstříku

Yarvik smartphone manual

DEVICE Audio profiles Display Storage Battery Apps PERSONAL Accounts & sync Location services Security Language & input Backup & reset SYSTEM Date & time Schedule power on/off Accessibility Accounts & sync Location services Security Language & input Backup & reset SYSTEM Date & time Schedule power o…

Nabídka Nastavení

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic - with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 (“Code of Electronic Communications”). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted; - with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Horizon SMP 50-201 - Conditions of use - 1

WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

- Yarvik is not responsible for any interference that you may experience or that may be caused when

operating this device.

- Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

- To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.

- To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.

- Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.

- Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.

- Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.

- This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.

- Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

- Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.

- Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.

- Avoid strong beating of or to the product.

- Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 1

facebook.com/yarvik

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 2

twitter.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 3

youtube.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 5

Návrat do rejstříku

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 6

yarvik

Register

SELECT LANGUAGE

4.3 Audio Profiles (Audio profily)

4.4 Display (Displej)

Uzamknutá obrazovka Android

Posuňte lištu uzamknutia (A) smerom doprava a odomknite smartfón. Potom prejdete na domovskú obrazovku Android.

Yarvik Ingenia Horizon SMP 50-201 - Register - 1

Návrat do indexu

3

Ponuka Nastavenia

k svojmu smartfónu Yarvik môžete pripojit' viacero zariadení Bluetooth a používat' ich naraz (napr. myš a klávesnicu).

Návrat do

indexu

4.3

Audio Profiles (Audio profily)

Kliknite na „OK“ a potvrd'te ho.

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

  • Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic
  • with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 ("Code of Electronic Communications"). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;
  • with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Horizon SMP 50-201 - Conditions of use - 1
WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract.

This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

  • To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.
  • To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.
  • Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.
  • Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.
  • Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.
  • This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.
  • Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:
  • Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.
  • Turn off the Smartphone device before putting the device into a bag or a carrying case.
  • Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.
  • Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.
  • Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.
  • Avoid strong beating of or to the product.
  • Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.
  • Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.
  • Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it

Yarvik smartphone manual

becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 1

facebook.com/yarvik

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 2

twitter.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 3

youtube.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 5

Návrat do indexu

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 6

yarvik

Indeks SELECT LANGUAGE

Skærmen Android Lock [Android-lås]

Skærmen Application [Application]

Yarvik Ingenia Horizon SMP 50-201 - Indeks SELECT LANGUAGE - 1

Returner til indeks

Menuen Settings [Indstillinger]

Klik på knappen "Turn on USB storage" [Aktiver USB-lagring]. Der vises et beskedvindue:

Turn on USB storage If you turn on USB storage, some applications you are using will stop and may be unavailable until you turn off USB storage. Cancel OK

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic - with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 ("Code of Electronic Communications"). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted; - with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Horizon SMP 50-201 - Conditions of use - 1

WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local

government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

  • To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.
  • To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.
  • Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.
  • Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.
  • Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.
  • This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.
  • Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:
  • Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.
  • Turn off the Smartphone device before putting the device into a bag or a carrying case.
  • Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.
  • Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.
  • Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.
  • Avoid strong beating of or to the product.
  • Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.
  • Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.
  • Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

- It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.

- This AC adapter is intended for use with the Smartphone device IT products only.

- Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 1

facebook.com/yarvik

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 2

twitter.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 3

youtube.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 5

Returner til indeks

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 6

yavlik

Android-låsskärm

Applikationsskärm

Storage Battery Apps PERSONAL Accounts & sync Location services Security Language & input Backup & reset SYSTEM Date & time Schedule power on/off Accessibility Accounts & sync Location services Security Language & input Backup & reset SYSTEM Date & time Schedule power on/off Accessibility { } Develo…

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic - with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 ("Code of Electronic Communications"). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted; - with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Horizon SMP 50-201 - Conditions of use - 1
WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it

responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages

that are not covered by the guarantee.

  • To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.
  • To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.
  • Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.

- Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.

- Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.

- This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.

- Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

- Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.

- Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.

- Avoid strong beating of or to the product.

- Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an

accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

- It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.

- This AC adapter is intended for use with the Smartphone device IT products only.

- Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

Yarvik smartphone manual

This products has been certified as RoHS Compliant.

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 1

facebook.com/yarvik

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 2

twitter.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 3

youtube.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 4

forum.yarvik.com

YARVIK.COM

Android låseskjerm

Applikasjonsskjerm

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 5

Tilbake til indeks

Innstillingsmeny

Vise Wi-Fi MAC-addressse for Yarvik Smartphone

De fleste Bluetooth-enheter krever en PIN-kode ved tilkobling. Denne koden er vanligvis 0000 eller 1234. Se bruksanvisningen for Bluetooth-enheten dersom PIN-koden er en annen. Etter du har lagt inn korrekt PIN-kode, klikk "OK".

Når den andre meldingen ("USB-tilkoblet") vises, klikp på den.

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic - with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 ("Code of Electronic Communications"). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;

- with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Horizon SMP 50-201 - Conditions of use - 1

WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling.

Business users should contact their supplier and check the terms and conditions of the purchase contract.

This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

- To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.

  • To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.
  • Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.
  • Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.
  • Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.
  • This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.
  • Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:
  • Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.
  • Turn off the Smartphone device before putting the device into a bag or a carrying case.
  • Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.
  • Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.
  • Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.
  • Avoid strong beating of or to the product.
  • Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.
  • Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.
  • Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes,

in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

  • If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.
  • Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.
  • If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

Yarvik smartphone manual

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 1

facebook.com/yarvik

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 2

twitter.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 3

youtube.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 5

Tilbake til indeks

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 6

yarvik

Kazalo SELECT LANGUAGE

Zaklenjeni zaslon Android

Zaslon aplikacij

Yarvik Ingenia Horizon SMP 50-201 - Kazalo SELECT LANGUAGE - 1

Vrni se na kazalo

Nastavitev

4

vašega pametnega telefona Yarvik

4.1

Meni Settings (Nastavitve)

Yarvik smartphone manual

DEVICE Audio profiles Display Storage Battery Apps PERSONAL Accounts & sync Location services Security Language & input Backup & reset SYSTEM Date & time Schedule power on/off Accessibility Accounts & sync Location services Security Language & input Backup & reset SYSTEM Date & time Schedule power o…

Meni nastavitev

Večina naprav Bluetooth zahteva pin kodo za povezavo. Ta koda je običajno 0000 ali 1234. Če je koda PIN drugačna, glejte navodila za uporabo svoje naprave Bluetooth.

Ko ste vnesli ustrezno pin kodo, pritisnite "OK" ("V redu").

Ko se prikaže drugo sporočilo ("USB connected" ("USB povezan")), ga kliknite.

Kliknite gumb "Turn on USB storage" ("Vklopi pomnilnik USB").

Za potrditev kliknite "OK" ("V redu").

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic - with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 (“Code of Electronic Communications”). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted; - with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Horizon SMP 50-201 - Conditions of use - 1

WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

- Yarvik is not responsible for any interference that you may experience or that may be caused when

operating this device.

- Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

- To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.

- To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.

- Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.

- Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.

- Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.

- This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.

- Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

- Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.

- Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.

- Avoid strong beating of or to the product.

- Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 1

facebook.com/yarvik

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 2

twitter.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 3

youtube.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 5

Vrni se na kazalo

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 6

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 7

Sadržaj

SELECT LANGUAGE

1 Prije prve uporabe

2 Pokretanje pametnog telefona

3 Androidov početni zaslon

3.1 Dodavanje malih programa i prečaca na početni zaslon

3.2 Postavljanje tapete

3.3 Izbornik s Apps (Aplikacije)

Androidov zaključani zaslon

Kako biste otključali telefon, prstom kliznite kvadratić (A) udesno. Nakon toga će Vam se prikazati Androidov početni zaslon.

Yarvik Ingenia Horizon SMP 50-201 - Sadržaj - 1

Povratak na sadržaj

3 Androidov početni zaslon

Yarvik smartphone manual

1 2 3 3:40 PM 5 4 6 7 8 9

Androidov početni zaslon

Kako biste odmah prebacili na neku od aktivnih aplikacija, jednostavno kliknite na nju na zaslonu s aktivnim aplikacijama. Aktivne aplikacije možete zatvoriti ako duže zadržite prst na njima, te zatim odaberete „Remove from list“ („Ukloni s popisa“).

Yarvik Ingenia Horizon SMP 50-201 - Androidov početni zaslon - 2

Povratak na sadržaj

3.1

Dodavanje malih programa

( widgets )

i prečaca na

početni zaslon

Kako biste dodali widget, pritisnite tipku za aplikacije i widgetu u desnom gornjem uglu početnog zaslona:

4:12 PM APP5 WIDGETS Browser Calculator Calendar Camera Clock Downloads Email ES File Explorer FBReader FM Radio Gallery Google Mail Latitude Maps Messaging Music Navigation OfficeSuite People Phone

Zaslon s aplikacijama

Yarvik Ingenia Horizon SMP 50-201 - ( widgets ) - 2

Povratak na sadržaj

Podešavanje 4 Yarvik pametnog telefona

Izbornik s Settings (Postavke)

Kako biste otvorili izbornik s postavkama, u izborniku s aplikacijama pritisnite ikonu Settings (Postavke) U izborniku Settings (Postavke) možete vidjeti opcije za podešavanje Yarvik telefona.

Yarvik Ingenia Horizon SMP 50-201 - Izbornik s Settings (Postavke) - 1

WIRELESS & NETWORKS SIM management Wi-Fi ON Bluetooth OFF Data usage More...

Yarvik smartphone manual

DEVICE Audio profiles Display Storage Battery Apps PERSONAL Accounts & sync Location services Security Language & input Backup & reset SYSTEM Date & time Schedule power on/off Accessibility Accounts & sync Location services Security Language & input Backup & reset SYSTEM Date & time Schedule power o…

Izbornik postavki

Kliknite na gumb „Turn on USB storage“ („Uključi USB pohranu“).

Kliknite na „OK“ za potvrdu.

Date & time (Datum i

Yarvik smartphone manual

vrijeme)

Prikaz ikona aplikacija može se promijenit bez prethodne najave.

Yarvik Ingenia Horizon SMP 50-201 - vrijeme) - 1

Povratak na sadržaj

Yarvik Ingenia Horizon SMP 50-201 - Povratak na sadržaj - 1

Telefonski pozivi

Pozivanje

Kako biste telefonirali na svom Yarvik pametnom telefonu, otvorite aplikaciju „Phone“ („Telefon“) na izborniku

s aplikacijama ili na početnom zaslonu Androida:

Yarvik Ingenia Horizon SMP 50-201 - Pozivanje - 1

Pomoću numeričke tipkovnice unesite telefonski broj.

1 QD 2 ABC 3 DEF 4 GHI 5 JKL 6 MNO 7 PQRS 8 TUV 9 WXYZ * 0 + #

Tipkovnica telefona.

1 -Prikaži tipkovnicu telefona (npr. za tonske opcije izbornika);
2 -Omogući/onemogući funkciju zvučnika;
3 -lsključi mikrofon;
4 -Stavi poziv na čekanje;
5 -Izbornik s više mogućnosti: dodaj još jedan telefonski poziv (konferencijski poziv) ili snimi telefonski poziv.

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic - with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 (“Code of Electronic Communications”). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted; - with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Horizon SMP 50-201 - Conditions of use - 1

WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

- Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.

- Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

• To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.

- To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.

- Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.

- Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.

- Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.

- This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.

- Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

- Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.

- Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.

- Avoid strong beating of or to the product.

- Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

- It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.

- This AC adapter is intended for use with the Smartphone device IT products only.

- Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 1

facebook.com/yarvik

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 2

twitter.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 3

youtube.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 5

Povratak na sadržaj

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 6

Tárgymutató

Yarvik Ingenia Horizon SMP 50-201 - Tárgymutató - 1

SELECT LANGUAGE

Yarvik smartphone manual

DEVICE Audio profiles Display Storage Battery Apps PERSONAL Accounts & sync Location services Security Language & input Backup & reset SYSTEM Date & time Schedule power on/off Accessibility Accounts & sync Location services Security Language & input Backup & reset SYSTEM Date & time Schedule power o…

Beállítások menü

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic - with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 ("Code of Electronic Communications"). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;

- with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Horizon SMP 50-201 - Conditions of use - 1

WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

- Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.

- Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

- To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.

- To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.

- Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.

- Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.

- Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.

- This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.

- Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

- Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.

- Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.

- Avoid strong beating of or to the product.

- Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

- It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.

- This AC adapter is intended for use with the Smartphone device IT products only.

- Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

Yarvik smartphone manual

RoHS

This products has been certified as RoHS Compliant.

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 1

facebook.com/yarvik

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 2

twitter.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 3

youtube.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 5

Vissza az ndexhez

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 6

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 7

Индекс

SELECT LANGUAGE

Екран Приложения

WIRELESS & NETWORKS SIM management Wi-Fi ON Bluetooth OFF Data usage More... DEVICE Audio profiles Display Storage Battery Apps PERSONAL Accounts & sync Location services Security Language & input Backup & reset SYSTEM Date & time Schedule power on/off Accessibility Accounts & sync Location services…

Yarvik Ingenia Horizon SMP 50-201 - Индекс - 2

Меню настройки

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

  • France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.
  • Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic
  • with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 (“Code of Electronic Communications”). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;
  • with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.
  • Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

WEEE

Yarvik Ingenia Horizon SMP 50-201 - WEEE - 1

Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

  • To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.
  • To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.
  • Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.
  • Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.
  • Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.
  • This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.
  • Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

- Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.

- Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.

- Avoid strong beating of or to the product.

- Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 1

facebook.com/yarvik

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 2

twitter.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 3

youtube.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 5

Връщане към индекса

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 6

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 7

Cuprins

SELECT

LANGUAGE

Ecran de aplicații

Yarvik Ingenia Horizon SMP 50-201 - Cuprins - 1

Revenire la cuprins

Meniul Setări

Dati clic pe butonul „Turn on USB storage“ („Activare stocare USB“).

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

  • France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.
  • Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic
  • with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 (“Code of Electronic Communications”). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;
  • with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.
  • Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

WEEE

Symbol

Information

Yarvik Ingenia Horizon SMP 50-201 - Conditions of use - 1

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

  • To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.
  • To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.
  • Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.
  • Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.
  • Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.
  • This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.
  • Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

- Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.

- Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.

- Avoid strong beating of or to the product.

- Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 1

facebook.com/yarvik

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 2

twitter.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 3

youtube.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 5

Revenire la cuprins

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 6

yarvik

Указатель

SELECT

LANGUAGE

4.8 Date & time (Дата и

время)

Yarvik smartphone manual

Экран приложений

WIRELESS & NETWORKS SIM management Wi-Fi ON Bluetooth OFF Data usage More... DEVICE Audio profiles Display Storage Battery Apps PERSONAL Accounts & sync Location services Security Language & input Backup & reset SYSTEM Date & time Schedule power on/off Accessibility Accounts & sync Location services…

Меню настроек

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic - with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 ("Code of Electronic Communications"). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted; - with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Horizon SMP 50-201 - Conditions of use - 1

WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

  • To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.
  • To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.
  • Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.
  • Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.
  • Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.
  • This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.
  • Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

- Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.

- Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.

- Avoid strong beating of or to the product.

- Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 1

facebook.com/yarvik

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 2

twitter.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 3

youtube.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 4

forum.yarvik.com

YARVIK.COM

3:24 PM 11/22/2012 Emergency call A No SIM card|No service

Екран програм

Назад до покажчика

Налаштування

4 смартфону

Yarvik

Меню налаштувань

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

- Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic - with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 ("Code of Electronic Communications"). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted; - with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Horizon SMP 50-201 - Conditions of use - 1

WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

  • To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.
  • To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.
  • Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.
  • Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.
  • Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.
  • This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.
  • Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

- Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.

- Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.

- Avoid strong beating of or to the product.

- Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.

- Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.

- Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
    • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 1

facebook.com/yarvik

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 2

twitter.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 3

youtube.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 5

Назад до

покажчика

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 6

YARVIK

Ευρετήριο

SELECT

LANGUAGE

Οθόνη Εφαρμογών

Yarvik Ingenia Horizon SMP 50-201 - Ευρετήριο - 1

4 TOU Smartphone Yarvik

4.1 Mevoú Settings (Ρυθμίσεις)

Depending on the model, the wireless LAN built-in into Smartphone devices can only be used in the following countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

Conditions of use

When using the IEEE 802.11b/g/n Wireless LAN standard, channels 1 to 13 (2.4 GHz...2.4835 GHz) are selectable for both indoor and outdoor use, however with restrictive conditions applying in France, Italy and Norway, as follows:

- France: When using this product indoor, all channels can be used without restrictions. Outdoor only channels 1 to 6 are allowed. This means that in Peer-to-Peer, the WLAN feature can only be used outside if the peer sets up the communication on an authorized channel (i.e., between 1 & 6). In infrastructure mode, please make sure the access point is configured to a channel from 1 to 6 before setting up the connection.

  • Italy: Use of the RLAN network is governed: Disposal of Old Electrical & Electronic
  • with respect to private use, by the Legislative Decree of 1.8.2003, no. 259 (“Code of Electronic Communications”). In particular Article 104 indicates when the prior obtainment of a general authorization is required and Art. 105 indicates when free use is permitted;
  • with respect to the supply to the public of the WLAN access to telecom networks and services, by the Ministerial Decree 28.5.2003, as amended, and Art. 25 (general authorization for electronic communications

networks and services) of the Code of electronic communications.

- Norway: Use of this radio equipment is not allowed in the geographical area within a radius of 20 km from the centre of Ny-Ålesund, Svalbard.

Yarvik Ingenia Horizon SMP 50-201 - Conditions of use - 1
WEEE Symbol Information

Correct Disposal of This product (Waste Electrical & Electronic Equipment).

(Applicable in the European Union and other European countries with separate collection systems).

This marking shown on the product or its literature indicates that it should not be disposed with other household wasted at the end of its working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take this item for environmentally safe recycling. Business users should contact their supplier and check the terms and conditions of the purchase contract. This product should not be mixed with other commercial wastes of disposal.

Disposal of waste batteries (applicable in the European Union and other European countries with separate collection systems)

Either of the symbols shown next may appear on the battery or on the packaging to indicate that the battery provided with this product shall not be treated as household waste. On certain batteries this symbol might be used in combination with a chemical symbol. The chemical symbols for mercury (Hg) or lead (Pb) are added if the battery contains more than 0.0005% mercury or 0.004% lead. By ensuring these batteries are disposed of correctly, you will help prevent potentially negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of the battery. The recycling of the materials will help to conserve natural resources. In case of products that for safety, performance or data integrity reasons require a permanent connection with an incorporated battery, this battery should be replaced by qualified service staff only. To ensure that the battery will be treated properly, hand over the product at end-of-life to the applicable collection point for the recycling of electrical and electronic equipment.

For all other batteries, please view the section on how to remove the battery from the product safely. Hand the battery over to the applicable collection point for the recycling of waste batteries. For more detailed information about recycling of this product or battery, please contact your local Local government Office, your household waste disposal service or the shop where you purchased the product.

OR Pb

When travelling to and within the United States of America, please be aware that the U.S. Department of Transportation (DOT) recently published new regulations that apply to passengers travelling with lithium metal batteries and lithium-ion batteries.

For detailed information, visit http://safetravel.dot.gov/whats_new_batteries.html.

Safety Information

Yarvik Smartphone device

  • Yarvik is not responsible for any interference that you may experience or that may be caused when operating this device.
  • Warning: This apparatus must be earthed.

Opening or dismantling the main unit or any of its accessories, for whatever reason, could lead to damages that are not covered by the guarantee.

• To avoid electrical shock, do not open the cabinet. Refer servicing to qualified personnel only.

• To prevent fire or shock hazard, do not expose your Smartphone device or any of its accessories to rain or moisture.

- Do not use or store your Smartphone device in a location subject to heat sources, such as radiators or air ducts; direct sunlight; excessive dust; moisture or rain; mechanical vibration or shock; strong magnets or speakers that are not magnetically shielded; excessively high and low temperatures; and high humidity.

- Turning off your Smartphone device with the power button does not disconnect the device completely from mains voltage. To disconnect it completely, unplug the AC adapter or the power cord from mains. The socket-outlet shall be installed near the equipment and shall be easily accessible.

- Audio and picture distortion may occur if this equipment is positioned in close proximity to any equipment emitting electromagnetic radiation.

- This apparatus is also designed for IT power system with phase to phase voltage 230V, for customers in Norway.

- Observe the following precautions to provide adequate air circulation and to ensure normal reliable operation:

- Do not use the Smartphone device and/or the AC adapter while covered or wrapped in cloth. Ensure the AC adapter operates in a clear environment.

- Turn off the Smartphone device before putting the device into a bag or a carrying case.

- Do not use your Smartphone device directly on your lap. The temperature of the base of the unit will rise during normal operation and over time could result in discomfort or burns.

  • Do not use your Smartphone device while walking. Listening to music with headphones or watching the LCD screen while walking may lead to an unexpected accident and result in personal injuries.
  • Using connected headphones on the Smartphone device for too long and/or setting the audio volume up too high when using headphones may cause serious hearing damage.
  • Avoid strong beating of or to the product.
  • Don't operate the touch screen of the Smartphone device with sharp objects, as this may result in scratching the screen surface.
  • Only use permitted batteries, chargers and accessories with your Smartphone device. The use of any other products with the device can be dangerous and may violate the warranty regulations.
  • Only use a slightly wet cotton cloth to clean the device, and only use water to wetten the cotton cloth. The Smartphone device should not be cleaned with any sort of (glass) cleaning aid.

Wireless functionality

- If radio interference with other devices occurs while using your Smartphone device, do not use the wireless functionality. Use of the wireless functionality may cause a malfunction of the devices, resulting in an accident.

- In some situations or environments, the use of the wireless functionality might be restricted by the proprietor of the building or responsible representatives of the organization, for example on board airplanes, in hospitals or in any other environment where the risk of interference with other devices or services is perceived or identified as harmful. If you are uncertain about the policy applying to the use of wireless functionality in a specific organization or environment, you are encouraged to first ask for authorization prior to switching it on. Consult your physician or the manufacturer of personal medical devices (pacemakers, hearing aids, etc.) regarding any restrictions on the use of wireless functionality.

- If using wireless functionality near a pacemaker, make sure it is at least 19 inches / 50 cm away from the pacemaker.

- Due to the transmission and reception properties of wireless communications, data can occasionally be lost or delayed. This can be due to the variation in radio signal strength that results from changes in the characteristics of the radio transmission path. Yarvik will not be held responsible for damages of any kind resulting from the delays or errors in data transmitted or received via wireless functionality, or failure of wireless functionality to transmit or receive such data.

- If the equipment does cause harmful interference to radio/TV reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: reorient or relocate the receiving antenna, increase the distance between the sender and the receiver, consult the dealer or an experienced radio/TV technician for help. Yarvik will not be responsible for any radio/TV interference nor for any other undesired effect.

Wireless LAN Security

Creating security settings for the Wireless LAN is extremely important. Yarvik assumes no responsibility for

Yarvik smartphone manual

any security problems that may arise from the use of the Wireless LAN.

Battery pack

Do not charge the battery pack in any way other than as described in the Start guide or as designated by Yarvik in writing.

AC adapter

  • It is highly recommended that you use a genuine Yarvik AC adapter supplied by Yarvik for your product.
  • This AC adapter is intended for use with the Smartphone device IT products only.
  • Do not place the AC adapter in contact with your skin. Remove the AC adapter away from your body if it becomes warm and causes discomfort.

RoHS

This products has been certified as RoHS Compliant.

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 1

facebook.com/yarvik

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 2

twitter.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 3

youtube.com/yarvikce

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 4

forum.yarvik.com

YARVIK.COM

Yarvik Ingenia Horizon SMP 50-201 - RoHS - 5

Table of contents Click a title to access it
Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : Yarvik

Model : Ingenia Horizon SMP 50-201

Category : Smartphone