ELECTROLUX EVM8E08V - Electric oven

EVM8E08V - Electric oven ELECTROLUX - Free user manual and instructions

Find the device manual for free EVM8E08V ELECTROLUX in PDF.

📄 480 pages English EN Download 💬 AI Question 10 questions ⚙️ Specs
Notice ELECTROLUX EVM8E08V - page 62
Pick your language and provide your email: we'll send you a specifically translated version.
Brand Electrolux
Model EVM8E08V
Product type Electric combination microwave oven
Front height 455 mm
Rear height 440 mm
Front width 595 mm
Rear width 559 mm
Depth 567 mm
Built-in depth 546 mm
Depth with door open 882 mm
Minimum cabinet height 444 mm (460 mm under countertop)
Cabinet width 560 mm
Cabinet depth 550 mm
Power supply 230 V (standard, check rating plate)
Power cable length 1500 mm
Microwave power 100 - 1000 W
Main functions Microwave, Grill, Grill + Microwave, Defrost, Melt, Reheat, Popcorn, Drinks, Timer, Clock, My programs, Key lock
Included accessories Turntable set (glass + roller support), Grill set
Recommended cleaning Soft cloth, warm water, mild detergent. Do not use steam cleaner or abrasive products.
Child safety Yes (activation by alphabetical code)
Key lock Yes
Display Touch screen with function indicators
Repairability Original spare parts, authorized after-sales service

Frequently Asked Questions - EVM8E08V ELECTROLUX

How to turn the oven on and off?
To turn the oven on, press the On/Off button (1). To turn it off, press and hold the same button again.
How to set the clock?
Go to Menu > Settings > Current time. Set the time and confirm with OK.
Which utensils can be used in the microwave?
Use only suitable containers: heat-resistant glass, porcelain without metal, plastic resistant up to 200 °C. Avoid metal, aluminum, and dishes with metallic decoration.
How to use the quick microwave start?
Press and hold the Quick microwave start button (6). The microwave will operate at 1000 W for 30 seconds. You can extend by pressing +1 min.
What to do if the oven does not heat?
Check that the oven is plugged in, the door is properly closed, the clock is set, and the fuse has not tripped. If child safety is activated, deactivate it via the Options menu.
How to clean the oven?
Use a soft cloth moistened with warm water and a mild detergent. Never use a steam cleaner, abrasive products, or metal objects. Clean the cavity after each use.
How to activate child safety?
Go to Menu > Options > Child safety and activate it. To unlock, you will need to enter an alphabetical code.
What cooking modes are available?
The modes are: Microwave (100-1000 W), Grill (low/high), Grill + Microwave, Defrost (100-200 W), Melt (100-400 W), Reheat (300-700 W), Popcorn (700-1000 W), and Drinks (800-1000 W).
How to save a favorite program?
Select the cooking mode and desired settings, then press My programs and choose Save current settings. You can save up to 3 programs.
What to do in case of error code F240 or F439?
These codes indicate a problem with touch sensors. Clean the display surface carefully with a soft cloth. If the problem persists, contact after-sales service.

User questions about EVM8E08V ELECTROLUX

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Electric oven in PDF format for free! Find your manual EVM8E08V - ELECTROLUX and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. EVM8E08V by ELECTROLUX.

USER MANUAL EVM8E08V ELECTROLUX

natural_image Line drawing of a circular metal grate with four legs and a central oval opening, no text or symbols present.
flowchart
graph LR
    A["①"] --> B["Document Icon ..."]
    B --> C["W"]
    C --> D["START"]
natural_image Line drawing of a circular metal tray with four legs and a central slot, no text or symbols present

4. JAK ZAPNOUT A VYPNOUT TROUBU

4.1 Ovládací panel

1 2 3 4 5 6

flowchart
graph LR
    A["①"] --> B["Icon: document with '...'"]
    B --> C["W"]
    C --> D["START"]

WE'RE THINKING OF YOU

Thank you for purchasing an Electrolux appliance. You've chosen a product that brings with it decades of professional experience and innovation. Ingenious and stylish, it has been designed with you in mind. So whenever you use it, you can be safe in the knowledge that you'll get great results every time.

Welcome to Electrolux.

Visit our website to:

ELECTROLUX EVM8E08V - WE'RE THINKING OF YOU - 1

Get usage advice, brochures, trouble shooter, service and repair information:

www.electrolux.com/support

ELECTROLUX EVM8E08V - WE'RE THINKING OF YOU - 2

Register your product for better service:

www.registerelectrolux.com

ELECTROLUX EVM8E08V - WE'RE THINKING OF YOU - 3

Buy Accessories, Consumables and Original spare parts for your appliance:

www.electrolux.com/shop

CUSTOMER CARE AND SERVICE

Always use original spare parts.

When contacting our Authorised Service Centre, ensure that you have the following data available: Model, PNC, Serial Number.

The information can be found on the rating plate.

ELECTROLUX EVM8E08V - CUSTOMER CARE AND SERVICE - 1

Warning / Caution-Safety information

ELECTROLUX EVM8E08V - CUSTOMER CARE AND SERVICE - 2

General information and tips

ELECTROLUX EVM8E08V - CUSTOMER CARE AND SERVICE - 3

Environmental information

Subject to change without notice.

CONTENTS

1. SAFETY INFORMATION......63

1.1 Children and vulnerable people safety.... 63
1.2 General Safety....64

2. SAFETY INSTRUCTIONS...... 66

2.1 Installation....66
2.2 Electrical connection....67
2.3 Use....68
2.4 Care and cleaning....68
2.5 Internal lighting.... 69
2.6 Service....69
2.7 Disposal....69

3. PRODUCT DESCRIPTION.... 70

3.1 General overview....70
3.2 Accessories.... 70

4. HOW TO TURN OVEN ON AND OFF..... 70

4.1 Control panel.... 70
4.2 Display....71

5. BEFORE FIRST USE....72

5.1 Initial Cleaning 73
5.2 First connection.... 73

6. DAILY USE.... 73

6.1 How to set the function: Grill + MW, Grill....73
6.2 How to set: Microwave heating functions....75
6.3 How to use: Microwave quick start 75
6.4 Heating functions....76

  1. CLOCK FUNCTIONS....77

7.1 Clock functions description......77

7.2 How to set: Clock functions...... 77

  1. HOW TO USE: ACCESSORIES......79

8.1 Inserting accessories....79

  1. ADDITIONAL FUNCTIONS.... 79

9.1 How to save: Favourites.... 79

9.2 Function lock....80

9.3 Cooling fan....80

  1. HINTS AND TIPS......80

10.1 Cooking recommendations......80

10.2 Microwave recommendations .....80

10.3 Microwave suitable cookware and materials 81

10.4 Recommended power settings for different kinds of food.... 82

10.5 Cooking tables for test institutes..83

  1. CARE AND CLEANING....84

11.1 Notes on cleaning....84

  1. TROUBLESHOOTING......85

12.1 What to do if....85

12.2 How to manage: Error codes.....85

12.3 Service data....86

  1. ENERGY EFFICIENCY......86

13.1 Energy saving....86

  1. MENU STRUCTURE......86

14.1 Menu....86

14.2 Submenu for: Options......87

14.3 Submenu for: Setup......87

14.4 Submenu for: Service.... 88

  1. IT'S EASY!...... 88

  2. ENVIRONMENTAL CONCERNS......89

1. ⚠ SAFETY INFORMATION

Before the installation and use of the appliance, carefully read the supplied instructions. The manufacturer is not responsible for any injuries or damage that are the result of incorrect installation or usage. Always keep the instructions in a safe and accessible location for future reference.

1.1 Children and vulnerable people safety

- This appliance can be used by children aged from 8 years and above and persons with reduced physical, sensory or mental capabilities or lack of experience and knowledge if they have been given supervision or instruction concerning the use of the appliance in a safe way and understand the hazards involved. Children of less than 8 years of age and persons with very extensive and complex disabilities shall be kept away from the appliance unless continuously supervised.

- Children should be supervised to ensure that they do not play with the appliance.

  • Keep all packaging away from children and dispose of it appropriately.
  • WARNING: The appliance and its accessible parts become hot during use. Keep children and pets away from the appliance when in use and when cooling down.
  • If the appliance has a child safety device, it should be activated.
  • Children shall not carry out cleaning and user maintenance of the appliance without supervision.

1.2 General Safety

• This appliance is for cooking purposes only.
- This appliance is designed for single household domestic use in an indoor environment.
- This appliance may be used in, offices, hotel guest rooms, bed & breakfast guest rooms, farm guest houses and other similar accommodation where such use does not exceed (average) domestic usage levels.
- Only a qualified person must install this appliance and replace the cable.
- Do not use the appliance before installing it in the built-in structure.
- Disconnect the appliance from the power supply before carrying out any maintenance.
- If the mains power supply cable is damaged, it must be replaced by the manufacturer, its Authorised Service Centre or similarly qualified persons to avoid an electrical hazard.
- WARNING: Ensure that the appliance is switched off before replacing the lamp to avoid the possibility of electric shock.
- WARNING: The appliance and its accessible parts become hot during use. Care should be taken to avoid touching heating elements.
- Always use oven gloves to remove or insert accessories or ovenware.

  • Use only the turntable and the turntable support designed for this appliance.
  • Do not activate the microwave function when the appliance is empty. Metal parts inside the cavity can create electric arcing.
  • Metallic containers for food and beverages are not allowed during microwave cooking. This requirement is not applicable if the manufacturer specifies size and shape of metallic containers suitable for microwave cooking.

- WARNING: If the door or door seals are damaged, the appliance must not be operated until it has been repaired by a qualified person.

- WARNING: Only a qualified person can carry out any service or repair operation that involves the removal of a cover which gives protection against exposure to microwave energy.

- WARNING: Do not heat liquids and other foods in sealed containers. They are liable to explode.

- Use only utensils that are suitable for use in microwave ovens.

- When heating food in plastic or paper containers, observe the appliance due to the possibility of ignition.

- The appliance is intended for heating food and beverages. Drying of food or clothing and heating of warming pads, slippers, sponges, damp cloth and similar may lead to risk of injury, ignition or fire.

- If smoke is emitted, switch off or unplug the appliance and keep the door closed in order to stifle any flames.

- Microwave heating of beverages can result in delayed eruptive boiling. Care must be taken when handling the container.

- The contents of feeding bottles and baby food jars shall be stirred or shaken and the temperature checked before consumption, in order to avoid burns.

  • Eggs in their shell and whole hard-boiled eggs should not be heated in the appliance since they may explode, even after microwave heating has ended.
  • The appliance should be cleaned regularly and any food deposits removed.
  • Do not use a steam cleaner to clean the appliance.
  • Do not use harsh abrasive cleaners or sharp metal scrapers to clean the glass door since they can scratch the surface, which may result in shattering of the glass.
  • Failure to maintain the appliance in a clean condition could lead to deterioration of the surface that could adversely affect the life of the appliance and possibly result in a hazardous situation.

2. SAFETY INSTRUCTIONS

2.1 Installation

ELECTROLUX EVM8E08V - Installation - 1

WARNING!

Only a qualified person must install this appliance.

  • Remove all the packaging.
  • Do not install or use a damaged appliance.
  • Follow the installation instructions supplied with the appliance.
  • Always take care when moving the appliance as it is heavy. Always use safety gloves and enclosed footwear.
  • Do not pull the appliance by the handle.
    • Install the appliance in a safe and suitable place that meets installation requirements.
  • Keep the minimum distance from other appliances and units.
  • Before mounting the appliance, check if the oven door opens without restraint.
  • The appliance is equipped with an electric cooling system. It must be operated with the electric power supply.
  • The built-in unit must meet the stability requirements of DIN 68930.
Cabinet minimum height (Cabinet under the work-top minimum height)444 (460) mm
Cabinet width 560 mm
Cabinet depth 550 (550) mm
Height of the front of the appliance 455 mm
Height of the back of the appliance 440 mm
Width of the front of the appliance 595 mm
Width of the back of the appliance 559 mm
Depth of the appliance 567 mm
Built in depth of the appliance 546 mm
Depth with open door 882 mm
Ventilation opening minimum size. Opening placed on the bottom rear side560x20 mm
Mains supply cable length. Cable is placed in the right corner of the back side1500 mm
Mounting screws 3.5x25 mm

2.2 Electrical connection

ELECTROLUX EVM8E08V - Electrical connection - 1

WARNING!

Risk of fire and electric shock.

  • All electrical connections should be made by a qualified electrician.
    • The appliance must be earthed.
  • Make sure that the parameters on the rating plate are compatible with the electrical ratings of the mains power supply.
  • Always use a correctly installed shockproof socket.
  • Do not use multi-plug adapters and extension cables.
  • Make sure not to cause damage to the mains plug and to the mains cable. Should the mains cable need to be replaced, this must be carried out by our Authorised Service Centre.
  • Do not let mains cables touch or come near the appliance door or the niche below the appliance, especially when it operates or the door is hot.
  • The shock protection of live and insulated parts must be fastened in such a way that it cannot be removed without tools.
  • Connect the mains plug to the mains socket only at the end of the installation. Make sure that there is access to the mains plug after the installation.
  • If the mains socket is loose, do not connect the mains plug.
  • Do not pull the mains cable to disconnect the appliance. Always pull the mains plug.
  • Use only correct isolation devices: line protecting cut-outs, fuses (screw type fuses removed from the holder), earth leakage trips and contactors.
  • The electrical installation must have an isolation device which lets you disconnect the appliance from the mains at all poles. The isolation device must have a contact opening width of minimum 3 mm.
  • This appliance is supplied with a main plug and a main cable.

2.3 Use

ELECTROLUX EVM8E08V - Use - 1

WARNING!

Risk of injury, burns and electric shock or explosion.

  • Do not change the specification of this appliance.
  • Make sure that the ventilation openings are not blocked.
  • Do not let the appliance stay unattended during operation.
  • Deactivate the appliance after each use.
  • Be careful when you open the appliance door while the appliance is in operation. Hot air can release.
  • Do not operate the appliance with wet hands or when it has contact with water.
  • Do not apply pressure on the open door.
  • Do not use the appliance as a work surface or as a storage surface.
  • Open the appliance door carefully. The use of ingredients with alcohol can cause a mixture of alcohol and air.
  • Do not let sparks or open flames to come in contact with the appliance when you open the door.
  • Do not put flammable products or items that are wet with flammable products in, near or on the appliance.
  • Do not use microwave function to preheat the oven.

ELECTROLUX EVM8E08V - WARNING! - 1

WARNING!

Risk of damage to the appliance.

  • To prevent damage or discoloration to the enamel:
    – do not put aluminium foil directly on the bottom of cavity of the appliance.
    – do not put water directly into the hot appliance.
    – do not keep moist dishes and food in the appliance after you finish the cooking.
    – be careful when you remove or install the accessories.
  • Discoloration of the enamel or stainless steel has no effect on the performance of the appliance.
    • Always cook with the appliance door closed.
  • If the appliance is installed behind a furniture panel (e.g. a door) make sure the door is never closed when the appliance operates. Heat and moisture can build up behind a closed furniture panel and cause subsequent damage to the appliance, the housing unit or the floor. Do not close the furniture panel until the appliance has cooled down completely after use.

2.4 Care and cleaning

ELECTROLUX EVM8E08V - Care and cleaning - 1

WARNING!

Risk of injury, fire, or damage to the appliance.

  • Before maintenance, deactivate the appliance and disconnect the mains plug from the mains socket.
  • Make sure the appliance is cold. There is the risk that the glass panels can break.
  • Replace immediately the door glass panels when they are damaged. Contact the Authorised Service Centre.
  • Be careful when you remove the door from the appliance. The door is heavy!

  • Make sure the cavity, the turntable and the door are wiped dry after each use. Steam produced during the operation of the appliance condensates on cavity walls and can cause corrosion.

  • Clean regularly the appliance to prevent the deterioration of the surface material.
  • Fat and food remaining in the appliance can cause fire and electric arcing when the microwave function operates.
  • Clean the appliance with a moist soft cloth. Use only neutral detergents. Do not use abrasive products, abrasive cleaning pads, solvents or metal objects.
  • If you use an oven spray, follow the safety instructions on its packaging.

2.5 Internal lighting

ELECTROLUX EVM8E08V - Internal lighting - 1

WARNING!

Risk of electric shock.

  • Concerning the lamp(s) inside this product and spare part lamps sold separately: These lamps are intended to withstand extreme physical conditions in household appliances, such as temperature, vibration, humidity, or are intended to signal information about the operational status of the appliance. They are not intended to be used in other applications and are not suitable for household room illumination.
  • This product contains a light source of energy efficiency class G.
  • Use only lamps with the same specifications.

2.6 Service

• To repair the appliance contact the Authorised Service Centre.
- Use original spare parts only.

2.7 Disposal

ELECTROLUX EVM8E08V - Disposal - 1

WARNING!

Risk of injury or suffocation.

  • Contact your municipal authority for information on how to dispose of the appliance.
  • Disconnect the appliance from the mains supply.
  • Cut off the mains electrical cable close to the appliance and dispose of it.
  • Remove the door catch to prevent children or pets from becoming trapped in the appliance.

3. PRODUCT DESCRIPTION

3.1 General overview

1 2 3 4 5 6

Control panel
Display
Heating element
Microwave generator
Lamp
Turntable shaft

3.2 Accessories

Turntable set

To prepare food.

Grill rack set

To grill.

≤ 4 kg

ELECTROLUX EVM8E08V - Accessories - 2

natural_image Line drawing of a circular metal tray with four legs and a central slot, no text or symbols present

4. HOW TO TURN OVEN ON AND OFF

4.1 Control panel

ELECTROLUX EVM8E08V - Control panel - 1

flowchart
graph TD
    A["1"] --> B["2"]
    B --> C["3"]
    C --> D["4"]
    E["★"] --> F["="]
    G["◇"] --> H["5"]
    I["1"] --> J["6"]
1ON / OFF Press and hold to turn the oven on and off.
2Menu Lists the oven functions.
3Favourites Lists the favourite settings.
4Display Shows the current settings of the oven.
5Lamp switch To turn the lamp on and off.
6Microwave quick startTo turn on microwave function (1000 W and 30 seconds).
ELECTROLUX EVM8E08V - Control panel - 2Press MoveELECTROLUX EVM8E08V - Control panel - 3ELECTROLUX EVM8E08V - Control panel - 4Press and hold
Touch the surface with finger-tip.Slide fingertip over the surface.Touch the surface for 3 seconds.

4.2 Display

300W High 12:34 E CDF B START A

After turning on, the display shows the main screen with the function and the default grill intensity.

A. Time of day
B. START/STOP
C. Grill intensity
D. Heating functions
E. Microwave power
F. Timer

ELECTROLUX EVM8E08V - Display - 2If you do not use the oven for 2 minutes, the display goes to standby.
ELECTROLUX EVM8E08V - Display - 3When you cook, the display shows the set functions and other available options.
Display indicators
Basic indicators - to navigate on the display.
OKTo confirm the selection / setting.<To go one level back in the menu.→To undo the last action.→To turn the options on and off.
Sound alarm function indicators - when the set time of cooking ends, the signal sounds.
The function is on.STOPThe function is on.Cooking stops automatically.Sound alarm is off.
Timer indicators
To set the function: Delayed start.×To cancel the setting.

5. BEFORE FIRST USE

ELECTROLUX EVM8E08V - BEFORE FIRST USE - 1

WARNING!

Refer to Safety chapters.

5.1 Initial Cleaning

ELECTROLUX EVM8E08V - Initial Cleaning - 1ELECTROLUX EVM8E08V - Initial Cleaning - 2ELECTROLUX EVM8E08V - Initial Cleaning - 3
Step 1 Step 2 Step 3
Remove all accessories from the oven.Clean the oven and the accessories with a soft cloth, warm water and a mild detergent.Place the accessories in the oven.

5.2 First connection

The display shows welcome message after the first connection.

You have to set: Language, Display brightness, Key tones, Buzzer volume, Time of day.

6. DAILY USE

ELECTROLUX EVM8E08V - DAILY USE - 1

WARNING!

Refer to Safety chapters.

6.1 How to set the function: Grill + MW, Grill

The oven can make noises when using the function: Grill + MW. They are normal for this function.

Setting the function: Grill + MW
Step 1 Insert the low grill rack.
Step 2 Turn on the oven. The display shows the default heating function.
Step 3 Press the symbol of the heating function to enter the submenu.
Step 4 Select the function: ☐Press: . OK
Step 5 Select the grill intensity level.
Function Grill intensity level
Lo Low
Hi High
Step 6Press: OK
Step 7Press: $START
STOP - press to turn off the oven.
Step 8 Turn off the oven.

Microwave power is limited to 500 W when you use the function: Grill + MW.

Setting the function: Grill
Step 1 Insert the high grill rack.
Step 2 Turn on the oven. The display shows the default heating function.
Step 3 Press the symbol of the heating function to enter the submenu.
Step 4 Select the function: ☐Press: . OK
Step 5 Select the grill intensity level.
Function Grill intensity level
Lo Low
Hi High
Step 6Press: OK
Step 7Press: $START
STOP - press to turn off the function.
Step 8 Turn off the oven.

6.2 How to set: Microwave heating functions

Step 1 Turn on the oven.
Step 2 Press the symbol of the heating function to enter the submenu.
Step 3Select the microwave heating function and press: OK The display shows: microwave power.
Step 4Set: microwave power. Press: OK
Step 5Press: $START
STOP - press to turn off the function.
Step 6 Turn off the oven.

The maximum time of microwave functions depends on microwave power you set:

MICROWAVE POWER MAXIMUM TIME
100 - 600 W 59 minutes
More than 600 W 7 minutes

If you open the door, the function stops. To start it again, press START

Take a shortcut!

ELECTROLUX EVM8E08V - How to set: Microwave heating functions - 1

flowchart
graph LR
    A["①"] --> B["Session"]
    B --> C["..."]
    C --> D["W"]
    D --> E["START"]

6.3 How to use: Microwave quick start

Step 1Press and hold: ⚠The microwave runs for 30 s.
Step 2 Toextend the cooking time:
Press on the running time value to go to the time settings. Set the cooking time.Press +30 s.
The microwave can be switched on at any time with: Microwave quick start.

6.4 Heating functions

STANDARD

Heating function Application
ELECTROLUX EVM8E08V - Heating functions - 1GrillTo grill thin pieces of food and to toast bread.
ELECTROLUX EVM8E08V - Heating functions - 2Grill + MWTo cook food in a short time and to brown it. You can set 2 levels of grill intensity: low and high.
ELECTROLUX EVM8E08V - Heating functions - 3MicrowaveHeating up, cooking, power range: 100 - 1000 W

MICROWAVE

Heating function Application
ELECTROLUX EVM8E08V - Heating functions - 4DefrostDefrosting meat, fish, cakes, power range: 100 - 200 W
ELECTROLUX EVM8E08V - Heating functions - 5—MeltingMelting chocolate and butter, power range: 100 - 400 W
ELECTROLUX EVM8E08V - Heating functions - 6—ReheatHeating up pre-prepared meals and delicate food, power range: 300 - 700 W
ELECTROLUX EVM8E08V - Heating functions - 7PopcornPreparing popcorn, power range: 700 - 1000 W
ELECTROLUX EVM8E08V - Heating functions - 8LiquidHeating up drinks and soups, power range: 800 - 1000 W

7. CLOCK FUNCTIONS

7.1 Clock functions description

Clock function Application
Cooking time To set the length of cooking. Maximum is 23 h 59 min.
End action To set what happens when the timer ends counting.
Time extension To extend cooking time.
Reminder To set a count down. Maximum is 23 h 59 min. This function has no effect on the operation of the oven.
Uptimer Monitors how long the function operates. Uptimer - you can turn it on and off.

7.2 How to set: Clock functions

How to set the clock
Step 1 Press: Time of day.
Step 2Set the time. Press: OK
How to set cooking time
Step 1 Choose the heating function.
Step 2Press: ⏻
Step 3Set the time. Press: OK
How to choose end option
Step 1 Choose the heating function.
Step 2Press: ⏻
Step 3 Set the cooking time.
Step 4Press: ● ● ●
Step 5 Press: End action.
Step 6 Choose the preferred: End action.
Step 7Press: OK Repeat the action until the display shows the main screen.
How to extend cooking time
When 10% of cooking time is left and the food seems not to be ready, you can extend cooking time. You can also change the heating function.
Press +1min to extend the cooking time.
How to change timer settings
Step 1Press: ⏻
Step 2 Set the timer value.
Step 3Press: OK
You can change the set time during cooking at any time.

8. HOW TO USE: ACCESSORIES

8.1 Inserting accessories

Use only suitable cookware and material. Refer to "Hints and tips" chapter, Microwave suitable cookware and materials.

Turntable set:Always cook food on the turntable set.Place the roller guide around the turntable shaft. Place the turntable glass on the roll-er guide.Use only the turntable set supplied with the oven.ELECTROLUX EVM8E08V - Inserting accessories - 1
Grill rack set:Place the grill rack with the silicon caps down on the turntable set.ELECTROLUX EVM8E08V - Inserting accessories - 2

9. ADDITIONAL FUNCTIONS

9.1 How to save: Favourites

You can save your favourite settings, such as the heating function, the cooking time or the cleaning function. You can save 3 favourite settings.

Step 1 Turn on the oven.
Step 2 Select the preferred setting.
Step 3Press:Select: Favourites.
Step 4 Select: Save current settings.
Step 5Press + to add the setting to the list of: Favourites. Press OK
press to reset the setting. press to cancel the setting.

9.2 Function lock

This function prevents an accidental change of the heating function.

Step 1 Turn on the oven.
Step 2 Set a heating function.
Step 3 ^ELECTROLUX EVM8E08V - Function lock - 1 press at the same time to turn on the function.
To turn off the function repeat step 3.

9.3 Cooling fan

When the oven operates, the cooling fan turns on automatically to keep the surfaces of the oven cool. If you turn off the oven, the cooling fan can continue to operate until the oven cools down.

10. HINTS AND TIPS

10.1 Cooking recommendations

i

The temperature and cooking times in the tables are guidelines only. They depend on the recipes and the quality and quantity of the ingredients used.

Your oven may cook differently to the oven you had before. The hints below show recommended heating functions and settings for cooking time for specific types of the food.

If you cannot find the settings for a special recipe, look for the similar one.

For more cooking recommendations refer to cooking tables on our website. To find the Cooking Hints check the PNC number on the rating plate on the front frame of the oven cavity.

10.2 Microwave recommendations

i Let's cook!

Do not place the food directly on the turntable. Always use the microwave suitable cookware.

Place the cookware in the middle of the turntable.

Contact with too hot or too cold items can break the turntable.

Turn or stir the food halfway through the defrosting and cooking time.

Stir liquid dishes from time to time.

Stir the food before serving.

Cover the food for cooking and reheating.

Put the spoon to the bottle or glass when heating drinks to ensure better heat distribution.

Put the food into the oven without packaging. The packaged ready meals can be put into the oven only when the packaging is microwave safe (check information on the packaging).

ELECTROLUX EVM8E08V - i Let's cook! - 1

Microwave cooking

Cook food covered. If you want to keep a crust cook food without a cover.

Do not overcook the dishes by setting the power and time too high. The food can dry out, burn or cause fire.

Do not use the oven to cook eggs or snails in their shells, because they can burst. Pierce the yolk of fried egg before reheating it.

Pierce food with skin or peel several times before cooking.

Cut vegetables into similar-sized pieces.

After you turn off the oven, take the food out and let it stand for a few minutes to allow the heat distribute evenly.

ELECTROLUX EVM8E08V - Microwave cooking - 1

Microwave defrosting

Put the frozen, unwrapped food on a small upturned plate with a container below it, or on a defrosting rack or plastic sieve so that the defrosting liquid can leak out.

Remove defrosted pieces subsequently.

To cook fruit and vegetables without defrosting them first, you can use a higher microwave power.

10.3 Microwave suitable cookware and materials

For the microwave use only suitable cookware and materials. Use below table as a reference.

Check the cookware / material specification before use.

Cookware / Material[7G7D]ELECTROLUX EVM8E08V - Microwave suitable cookware and materials - 1ELECTROLUX EVM8E08V - Microwave suitable cookware and materials - 2ELECTROLUX EVM8E08V - Microwave suitable cookware and materials - 3
ELECTROLUX EVM8E08V - Microwave suitable cookware and materials - 4ELECTROLUX EVM8E08V - Microwave suitable cookware and materials - 5ELECTROLUX EVM8E08V - Microwave suitable cookware and materials - 6ELECTROLUX EVM8E08V - Microwave suitable cookware and materials - 7
Ovenproof glass and porce-lain with no metal compo-nents, e.g. heat-proof glassELECTROLUX EVM8E08V - Microwave suitable cookware and materials - 8ELECTROLUX EVM8E08V - Microwave suitable cookware and materials - 9ELECTROLUX EVM8E08V - Microwave suitable cookware and materials - 10[2AKC]
Non-ovenproof glass and porcelain without any silver, gold, platinum or other metal decorationsELECTROLUX EVM8E08V - Microwave suitable cookware and materials - 11[2D68]
Glass and glass ceramic made of ovenproof / frost-proof material[242X]ELECTROLUX EVM8E08V - Microwave suitable cookware and materials - 12ELECTROLUX EVM8E08V - Microwave suitable cookware and materials - 13[077T]
Ceramic and earthenware without any quartz or metal components and glazes which contain metalELECTROLUX EVM8E08V - Microwave suitable cookware and materials - 14[07TW][X245]ELECTROLUX EVM8E08V - Microwave suitable cookware and materials - 15
Ceramic, porcelain and earth-enware with unglazed bottom or with small holes, e.g. on handlesELECTROLUX EVM8E08V - Microwave suitable cookware and materials - 16
Cookware / MaterialELECTROLUX EVM8E08V - Microwave suitable cookware and materials - 17ELECTROLUX EVM8E08V - Microwave suitable cookware and materials - 18ELECTROLUX EVM8E08V - Microwave suitable cookware and materials - 19ELECTROLUX EVM8E08V - Microwave suitable cookware and materials - 20
Heat-resistant plastic up to 200 °CXX
Cardboard, paper X X X
Clingfilm X X X
Roasting film with microwave safe closureXX
Roasting dishes made of metal, e.g. enamel, cast ironX X X
Baking tins, black lacquer or silicon-coatedX X X
Cookware for microwave use, e.g. crisp panX X X
Grill rack set X X

The data in the table is for guidance only.

800 - 1000 W
ELECTROLUX EVM8E08V - Recommended power settings for different kinds of food - 1Searing at the start of the cooking process Heating liquidsELECTROLUX EVM8E08V - Recommended power settings for different kinds of food - 2
500 - 700 W
ELECTROLUX EVM8E08V - Recommended power settings for different kinds of food - 3Cooking vegeta-blesELECTROLUX EVM8E08V - Recommended power settings for different kinds of food - 4Cooking egg dishesELECTROLUX EVM8E08V - Recommended power settings for different kinds of food - 5Simmering stewsELECTROLUX EVM8E08V - Recommended power settings for different kinds of food - 6Heating one-plate mealsELECTROLUX EVM8E08V - Recommended power settings for different kinds of food - 7Defrosting and heating frozen meals
300 - 400 W
ELECTROLUX EVM8E08V - Recommended power settings for different kinds of food - 8Melting cheese,chocolate, butterELECTROLUX EVM8E08V - Recommended power settings for different kinds of food - 9Simmering riceELECTROLUX EVM8E08V - Recommended power settings for different kinds of food - 10Heating babyfoodELECTROLUX EVM8E08V - Recommended power settings for different kinds of food - 11Cooking / Heatingdelicate foodELECTROLUX EVM8E08V - Recommended power settings for different kinds of food - 12Continuingcooking
100 - 200 W
ELECTROLUX EVM8E08V - Recommended power settings for different kinds of food - 13Defrosting breadELECTROLUX EVM8E08V - Recommended power settings for different kinds of food - 14Defrosting fruit and cakesELECTROLUX EVM8E08V - Recommended power settings for different kinds of food - 15Defrosting cheese, cream, butterELECTROLUX EVM8E08V - Recommended power settings for different kinds of food - 16Defrosting meat, fish

10.5 Cooking tables for test institutes

Information for test institutes

Tests according to IEC 60705.

MICROWAVE FUNCTIONELECTROLUX EVM8E08V - Information for test institutes - 1 (W)ELECTROLUX EVM8E08V - Information for test institutes - 2 (kg)ELECTROLUX EVM8E08V - Information for test institutes - 3ELECTROLUX EVM8E08V - Information for test institutes - 4 (min)ELECTROLUX EVM8E08V - Information for test institutes - 5
Sponge cake 600 0.475 Turntableset5 - 7 -
Meatloaf 500 0.9 Turntableset18 - 20 -
Egg custard 500 1 Turntableset15 - 17 -
Meat defrosting 200 0.5 Turntableset8 - 9 -
Use the function: Microwave grilling.Use the low grill rack.
MICROWAVE COMBI FUNCTIONELECTROLUX EVM8E08V - Information for test institutes - 6(W) Grill intensity levelELECTROLUX EVM8E08V - Information for test institutes - 7ELECTROLUX EVM8E08V - Information for test institutes - 8(min)ELECTROLUX EVM8E08V - Information for test institutes - 9
Potato gratin, 1.1 kg 300 low 30 - 35 -
Chicken, 1.1 kg 300 high 30 - 35 Put the meat inround glass container.

11. CARE AND CLEANING

ELECTROLUX EVM8E08V - CARE AND CLEANING - 1

WARNING!

Refer to Safety chapters.

11.1 Notes on cleaning

ELECTROLUX EVM8E08V - Notes on cleaning - 1

Cleaning Agents

ELECTROLUX EVM8E08V - Notes on cleaning - 2

Everyday Use

ELECTROLUX EVM8E08V - Notes on cleaning - 3

Accessories

Clean the front of the oven with a soft cloth with warm water and a mild detergent.

Use a cleaning solution to clean metal surfaces.

Clean stains with a mild detergent.

Clean the cavity after each use. Fat accumulation or other residue may cause fire.

Clean the oven ceiling carefully from residue and fat.

Do not store the food in the oven for longer than 20 minutes. Dry the cavity with a soft cloth after each use.

Clean all accessories after each use and let them dry. Before cleaning, wait until the turntable is cold. There is a risk that the turntable can break. Use a soft cloth with warm water and a mild detergent. Do not clean the accessories in a dishwasher.

Do not clean the non-stick accessories using abrasive cleaner or sharp-edged objects.

12. TROUBLESHOOTING

ELECTROLUX EVM8E08V - TROUBLESHOOTING - 1

WARNING!

Refer to Safety chapters.

12.1 What to do if...

ELECTROLUX EVM8E08V - What to do if... - 1

The oven does not turn on or does not heat up

ELECTROLUX EVM8E08V - The oven does not turn on or does not heat up - 1

Possible cause

ELECTROLUX EVM8E08V - Possible cause - 1

Remedy

The oven is not connected to an electrical supply or it is connected incorrectly.

The clock is not set. Set the clock, for details refer

The door is not closed correctly. Fully close the door.

The fuse is blown. Make sure the fuse is the cause

The oven Child Lock is on. Refer to "Menu" chapter, Submenu for: Op-

ELECTROLUX EVM8E08V - Remedy - 1

Components

ELECTROLUX EVM8E08V - Components - 1

Description Remedy

ELECTROLUX EVM8E08V - Description Remedy - 1

The lamp is burnt out. Replace the lamp, for detail

The turntable set makes noise. There is food resi

s refer to "Care and

Cleaning" chapter, How to replace: Lamp.

ue below the turntable set.

12.2 How to manage: Error codes

When the software error occurs, the display shows error message.

In this section, you will find the list of the problems that you can handle on your own.

ELECTROLUX EVM8E08V - How to manage: Error codes - 1Code and description RemedyELECTROLUX EVM8E08V - How to manage: Error codes - 2
F240, F439 - the touch fields on the display do not work properly.Clean the surface of the display. Make sure there is no dirt on the touch fields.
F908 - the oven system cannot connect with the control panel.Turn the oven off and on.

12.3 Service data

If you cannot find a solution to the problem yourself, contact your dealer or an Authorised Service Centre.

The necessary data for the service centre is on the rating plate. The rating plate is on the front frame of the oven cavity. Do not remove the rating plate from the oven cavity.

We recommend that you write the data here:
Model (MOD.)
Product number (PNC)
Serial number (S.N.)

13. ENERGY EFFICIENCY

13.1 Energy saving

Make sure that the oven door is closed when the oven operates. Do not open the oven door too often during cooking. Keep the door gasket clean and make sure it is well fixed in its position.

When possible, do not preheat the oven before cooking.

Keep breaks between baking as short as possible when you prepare a few dishes at one time.

Cooking with the lamp off

Turn off the lamp during cooking. Turn it on only when you need it.

14. MENU STRUCTURE

14.1 Menu

Press to open Menu.

Menu item Application
Favourites Lists the favourite settings.
Options To set the oven configuration.
Menu item Application
Settings Setup To set the oven configuration.
Service Shows the software version and configuration.

14.2 Submenu for: Options

Submenu Application
Light Turns the lamp on and off.
Child Lock Prevents accidental activation of the oven. When the option is on, the text "Child Lock" appears on the display when you turn on the oven. To enable the oven use, choose the code letters in the alphabetical order. Access to the timer, the remote operation and the lamp is available with the Child Lock on.
Time indication Turns the clock on and off.
Digital clock style Changes the format of the displayed time indication.

14.3 Submenu for: Setup

Submenu Description
Language Sets the oven language.
Display brightness Sets the display brightness.
Key tones Turns the tone of the touch fields on and off. It is not possible to mute the tone for: 1
Buzzer volume Sets the volume of key tones and signals.
Time of day Sets the current time and date.

14.4 Submenu for: Service

Submenu Description
Demo mode Activation / deactivation code: 2468
Software version Information about software version.
Reset all settings Restores factory settings.

15. IT'S EASY!

Before first use you have to set:
LanguageDisplay brightnessKey tones BuzzerVolume Time of day
Familiarize yourself with the basic icons on the control panel and the display:
ON / OFF MenuFavouritesTimerSTART / STOP
Start using the oven
MW quick start Start Microwave at any time with default settings: 30 sec / 1000W.Press: ⏻
ELECTROLUX EVM8E08V - IT'S EASY! - 1ELECTROLUX EVM8E08V - IT'S EASY! - 2ELECTROLUX EVM8E08V - IT'S EASY! - 3ELECTROLUX EVM8E08V - IT'S EASY! - 4
heating / cooking100 - 1000 Wcooking / browningintensity: low / highcooking / browningheating liquids800 - 1000 W
ELECTROLUX EVM8E08V - IT'S EASY! - 5ELECTROLUX EVM8E08V - IT'S EASY! - 6ELECTROLUX EVM8E08V - IT'S EASY! - 7ELECTROLUX EVM8E08V - IT'S EASY! - 8
reheating300 - 700 Wdefrosting100 - 200 Wmelting100 - 400 Wpreparing popcorn700 - 1000 W
Settings of the microwave Microwave tips
Microwave power: Maximum time:Cover the food for cooking and reheating. Turn or stir the food halfway through the de-frosting and cooking time. Put the spoon to the dish when heating liquids. Put the food into the oven without packaging (only microwave safe).
100 - 600 W 59 min
>600 W 7 min
Start cooking
Step 1 Step 2Step 3 Step 4Step 5
1- press to turn on the oven.... - select the function.W- set the micro-wave power.OK- press to confirm.START- press to start cooking.
Use quick functions to set the cooking time
10% Finish assistUse 10% Finish assist to add extra time when 10% of the cooking time is left.To extend the cooking time press +1min.

16. ENVIRONMENTAL CONCERNS

Recycle materials with the symbol Put the packaging in relevant containers to recycle it. Help protect the environment and human health by recycling waste of electrical and electronic appliances. Do not dispose of appliances marked with the symbol with the household waste. Return the product to your local recycling facility or contact your municipal office.

2. OHUTUSJUHISED....94

2.1 Paigaldamine....94

2.2 Elektriühendus....95

2.3 Kasutamine....96

natural_image Line drawing of a circular metal grate with four legs and a central oval opening, no text or symbols present.

4. AHJU SISSE- JA VÄLJALÜLITAMINE

4.1 Juhtpaneel

1 2 3 4 5 6

12:34

1000W 1m23s 12:34:12 +30s STOPS

flowchart
graph LR
    A["①"] --> B["Session Box ..."]
    B --> C["W"]
    C --> D["START"]
natural_image Line drawing of a circular metal grate with four legs and a central oval opening, no text or symbols present.

4. COMMENT ALLUMER ET ÉTEINDRE LE FOUR

12:34

1000W 1m23s 12:34:12 +30s STOPS

natural_image Line drawing of a circular metal grate with four legs and a central oval opening, no text or symbols present.
flowchart
graph LR
    A["①"] --> B["Image Session ..."]
    B --> C["W"]
    C --> D["START"]
natural_image Line drawing of a circular metal tray with four legs and a central slot, no text or symbols present

4. A SÜTŐ BE- ÉS KIKAPCSOLÁSA

4.1 Kezelőpanel

1 2 3 4 5 6

flowchart
graph LR
    A["①"] --> B["② ..."]
    B --> C["W"]
    C --> D["START"]
natural_image Line drawing of a circular metal grate with four legs and a central oval opening, no text or symbols present.

4. COME ACCENDERE E SPEGNERE IL FORNO

natural_image Technical diagram showing a circular component with internal structure and a small base component (no text or symbols)
natural_image Line drawing of a circular metal grate with a central base and wheels (no text or symbols)
natural_image Line drawing of a circular metal grate with four legs and a central oval opening, no text or symbols present.

4. CEPEŠKRĀSNS IESLĒGŠANA UN IZSLĒGŠANA

4.1 Vadības panelis

① ② ③ ④ 5 6

12:34

1000W 1m23s 12:34:12 +30s STOPS

flowchart
graph LR
    A["①"] --> B["Print Icon ..."]
    B --> C["W"]
    C --> D["START"]
natural_image Line drawing of a circular metal table with four legs and a central oval panel (no text or symbols)

4. KAIP IJUNGTI IR IŠJUNGTI ORKAITE.

4.1 Valdymo skydelis

1 2 3 4 5 6

12:34

12:34:12 +30s10 STOPS

ljunge pagrindiniame ekrane pamatysite pasirinkta funkcija ir numatytaji grilio intensyvumu.

A. Paros laikas
B. PRADÉTI/SUSTABDYMAS
C. Grilio intensyvumas
D. Kaitinimo funkcijos
E. Mikrobangu galia
F. Laikmatis

flowchart
graph LR
    A["①"] --> B["..."]
    B --> C["W"]
    C --> D["START"]
natural_image Line drawing of a circular metal grate with four legs and a central oval opening, no text or symbols present.

4. WŁĄCZANIE I WYŁĄCZANIE PIEKARNIKA

12:34

1000W 1m23s 12:3412 +30s STOPS

flowchart
graph LR
    A["①"] --> B["Image Session ..."]
    B --> C["W"]
    C --> D["START"]
natural_image Line drawing of a circular metal tray with four legs and a central oval opening, no text or symbols present.

4. COMO LIGAR E DESLIGAR O FORNO

4.1 Painel de comandos

1 2 3 4 5 6

natural_image Line drawing of a circular metal tray with four legs and a central slot, no text or symbols present

4. ВКЛЮЧЕНИЕ И ВЫКЛЮЧЕНИЕ.

12:34

12:34:12 +30s10 STOPS

flowchart
graph LR
    A["①"] --> B["Image Session Icon ..."]
    B --> C["W"]
    C --> D["START"]
natural_image Line drawing of a circular metal tray with four legs and a central slot, no text or symbols present

4. AKO ZAPNÚŤ A VYPNÚŤ RÚRU

4.1 Ovládací panel

1 2 3 4 5 6

flowchart
graph LR
    A["①"] --> B["Image Session Icon ..."]
    B --> C["W"]
    C --> D["START"]
natural_image Line drawing of a circular metal grate with a central base and wheels (no text or symbols)

9. DOPLNKOVÉ FUNKCIE

natural_image Line drawing of a circular metal tray with four legs and a central slot, no text or symbols present

4. CÓMO ENCENDER Y APAGAR EL HORNO

4.1 Panel de mandos

1 2 3 4 5 6

12:34

12:34:12 +30s10 STOPS

flowchart
graph LR
    A["①"] --> B["Image Session ..."]
    B --> C["W"]
    C --> D["START"]
natural_image Line drawing of a circular metal tray with four legs and a central handle, no text or symbols present
natural_image Repeating pattern of gray geometric shapes on white background, no text or symbols present
Table of contents Click a title to access it
Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : ELECTROLUX

Model : EVM8E08V

Category : Electric oven