GMK110 - Electric meter Goodwe - Free user manual and instructions
Find the device manual for free GMK110 Goodwe in PDF.
User questions about GMK110 Goodwe
0 question about this device. Answer the ones you know or ask your own.
Ask a new question about this device
Download the instructions for your Electric meter in PDF format for free! Find your manual GMK110 - Goodwe and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. GMK110 by Goodwe.
USER MANUAL GMK110 Goodwe
- The information in this quick installation guide is subject to change due to product updates or other reasons. All descriptions here are for guidance only.
- Before installations, read through the quick installation guide.
- All operations should be performed by trained and knowledgeable technicians who are familiar with local standards and safety regulations.
- Check the deliverables for correct model, complete contents, and intact appearance. Contact the manufacturer if any damage is found or any component is missing.
- Strictly follow the installation, operation, and configuration instructions in this guide and user manual. The manufacturer shall not be liable for equipment damage or personal injury if you do not follow the instructions. For more warranty details, please visit https://en.goodwe.com/warranty.
Safety Disclaimer

WARNING
- Make sure that the device is powered off before any operations.
- Ensure the cables are connected tightly, securely, and correctly. Inappropriate wiring may cause poor contact or damage the device.
- No operations while the meter is powered on. Otherwise, it will cause personal injury or damage to the meter. Additional circuit breakers are recommended on the voltage input side of the meter.
- If the voltage of the power grid fluctuates, resulting in the voltage to exceed 265V, in this case, long-term overvoltage operation may cause damage to the meter. It is recommended to add a fuse with a rated current of 0.5A on the voltage input side of the meter to protect it.
- In areas at risk of lightning, if the device cable exceeds 10m and wired without grounded metal conduits, you are recommended to use an external lightning protection device.
- The ingress protection rating of the smart meter is IP20, which is suitable to be installed indoors or inside of the distribution box. For outdoor installation, prepare a waterproof cover (by yourself) to protect the smart meter. Otherwise it will cause damage to the equipment, which is beyond the manufacturer's liability.
- Warning labels on the smart meter are as follows.
| High voltage hazard. Power off the smart meter first before any operations. | Potential risks exist. Wear proper PPE before any operations. | ||
| Read through the guide before any operations. | Equipment protected throughout by DOUBLE INSULATION or REINFORCED INSULATION. |
| RCM marking. Do not dispose of the product | as household waste. Discard the product in compliance with local laws and regulations, or send it back to the manufacturer. | |
| CE | CE marking. NA NA |
Check before Power-on
| No. Check Item | |
| 1 | The product is firmly installed at a clean place that is well-ventilated and easy-to-operate. |
| 2 | The input power cables, CT Cables, and communication cables are connected correctly and securely. |
| 3 | Cable ties are intact, routed properly and evenly. |
Storage
If the equipment is not to be installed or used immediately, please ensure that the storage environment meets the following requirements:
- Do not unpack the outer package or throw the desiccant away.
- Store the equipment in a clean place. Make sure the temperature and humidity are appropriate and no condensation.
- If the smart meter has been long term stored, it should be checked by professionals before being put into use.
02 EU Declaration of Conformity
The module sold in the European market meets the following directives and requirements:
- Electromagnetic compatibility Directive 2014/30/EU (EMC)
- Electrical Apparatus Low Voltage Directive 2014/35/EU (LVD)
- Restrictions of Hazardous Substances Directive 2011/65/EU and (EU) 2015/863 (RoHS)
- Waste Electrical and Electronic Equipment 2012/19/EU
- Registration, Evaluation, Authorization and Restriction of Chemicals (EC) No 1907/2006 (REACH)
You can download the EU Declaration of Conformity on https://en.goodwe.com.
03 Technical Parameters
| Model GMK110 GMK110D | ||||
| Input | Grid Single-phase | |||
| Voltage | Nominal Voltage-Line to N (Vac) | 230 | ||
| Voltage Range (Vac) 85 | 288 | |||
| Nominal AC Grid Frequency (Hz) | 50/60 | |||
| Current | Current Transformer Ratio | 120A: 40mA | ||
| Number of Current Transformers | 1 | 2 | ||
| Communication RS485 | ||||
| Communication Distance (m) 1000 | ||||
| User interface 2 LED | ||||
| Accuracy | Voltage/Current Class 1 | |||
| Active Energy Class 1 | ||||
| Reactive Energy Class 2 | ||||
| Power Consumption (W) ≤5 | ||||
| Structural Parameters | Dimensions (W×H×D mm) 19×85×6 | |||
| Weight (g) 50 | ||||
| Mounting | DIN rail | |||
| Environment Parameters | Ingress Protection Rating | IP20 | ||
| Operating Temperature Range (℃) | -30~+60 | |||
| Storage Temperature Range (℃) | -30~+70 | |||
| Relative Humidity (non-condensing) | 0%~95% | |||
| Max. Operating Altitude (m) | 3000 | |||
NOTE
The smart meter is mainly used for power control at the grid-connection point. The measured energy yield and electricity consumption are for reference only and cannot be used as a basis for calculating electricity fees. Electricity fee measurement is subject to the meter provided by the grid company.
01 ПразаMuMepKn
BG
06u oTKa3 OT OTROBOPHOCT
-ИнформацятаВ_TOBa pьКОВоДСТВО 3a 6ьрЗО ИНСТаліраHe ПОДпжи Ha npOMЯHa
-nopади akTyaIIIN3aцин Ha пpoДуКТа nIIN dpyrN пPuHn. BcUckn Oписаня ТуК ca caMo
3a opNeHTnp.
- Ппеди Инсталларе, поче тete КраTKOTO рьковдгTO 3a MOтack.
- BcnuKn onepaun Tp6Ba da ce n3BbPWBat OT obyuHn N KOMnTeHTN TeHNu, KOINTO ca 3aNO3HaTN C MeCTHNTe CTaHdAPTN IN PpaBUNa 3a 6e3OnaCHOCT.
- PpOBepTe DoCTaBKeTe 3a npaBnJeH MoJe, NbIHO CbIbPkaHne n HeNoKbTHaT BbHWeH Bd. CbIbPxeTe ce c npOn3BoDnteJra, aKO OTKpnTe NOBpeDa IIN JInca Ha HRAKOJI KOMIOHeHT.
Cn3BaIe cTpIKTHO HNCTpyKcHInTe 3a INHCTaIInpaHe, pa6oTa n KOHfUpypaHe B TOBa pBKOBOdCTBO n B pBKOBOdCTBOTO 3a NOTpe6bnteJI. PpOn3BOdNTeJIr T He Hocn OTROBOPHOCT 3a NOBpeHa Ha O6OpyDBAHeTo IJI N 3a TeLeChn NOBpeJn, aKO He Cn3BaTe INCTpyKcHInTe. 3a NOBeue NpOp6HoCTn OTHOCHO rapaHcIraTa, MoJI, NocTeTe aIpec https://en.goodwe.com/warranty.
Дeкларачnia 3a 6e3oNaCHOCT

PPEyPExKDEHNE
- YBepete ce, ye yctpoiCTBOTo e N3KJIIOUeHo, npei Da N3BbPWBaTe KaKBInTO I da e onepaun.
- YBepTe ce, ye Ka6eIte ca Cbbp3aHn NlblTHO, cnrypHo n npabuHNo. HenoJxOJaTo Oka6eJIBaHe MoKe Da IOBeDe Do low KOHTaKT IInn Da NOBpeDu yCTPOINCTBOTo.
He n3BbPbBaIe Oepaun,doKaTo n3MepBaTeHnT ype e noHa npexeHne. B npotnbEn clyuaycnbIecTByBa pNCK OT hapaHraBaHn IIN NOpeDa Ha n3MePBATeHnYpeD.IpnopbUba ce da 6bDat HnCTaInpaHn DoNbHnTeHn IpekbcBauH ot ctpaHaTa Ha BXoHDHTO HApexeHne Ha n3MePBATeHnYpeD.
Ako HapexeHneTo Ha eIekTpueckata MpeXa Bapnpa, B pe3yltat Ha Koeto HapexeHneTo HadBnShaBa 265 V, B TO3n clyuaN dIbIroCpoUHaT a pa6Ota npi npEHaPexeHne Moxe Da npuHn NOBpeDa Ha I3MePbTeHnYpeD. IpeOpbYBa ce da do6abTe pEpaNTeJ C HomHaJIeH Tok 0,5 A OT cTpaHata Ha BXoDHOTo HapexeHne Ha I3MePbTeHnYpeD, 3a Da rO ppePa3nte.
B30HcPCKOTMbHNn,akoKa6eJIbTHa yCTpoiCTBOTo HaBnUaBa 10 m n e oka6eJeh 6e33a3eMeHmMetaHn Tpb6oNpOBoOu, npenOpbYBaMe da n3NoI3BaTe BbHsHO yCTPOICTBO 3a3aUNTa OT MbHNn. - CTeHNTa Ha 3aUHTa OT npOHKBaHe Ha smart meter e IP20, KoTo e noDxOJa3a INCTaJIIPAhe Ha 3aKpIto IIN BbB BbTpeSHOCTTa Ha pa3npedeJIteJHaTa KUTy. Pn MOHTaX Ha OTKpIto OCnpyte BOHOePOnHuaemo NOKpITne (3aKynBa ce OTdEnHo), 3a Da 3aUHTte INTEJIreHTHna I3MepBaTeJeH ypeI. B npOTuBeH cIyaua TOBa Ue IOBede Do NobpeDa Ha o6OpyDbAHeTo, 3a KoTo npON3BOJnteJrT He Hocn OTROBOPHOCT.
- П dedуп dedителнite etiketn Bbpx nHTeInreHTHn y3MepBaTeJen ype d ca cneHnTe.

Front View Side view
Bottom view

GMK110:CT1+/CT1-
GMK110D:CT1+/CT1-,CT2+/CT2-

CT
05 Installation
Packing List

Smart Meter × 1^[1]

RS485 Communication Terminal x 1

AC Terminal x 1

PIN Terminal x 4


Screwdriver x 1 Documents x 1

Installation and Cable Connection
[1]. GMK110: CT × 1; GMK110D: CT × 2.
| Type | Conductor cross-sectional area |
| RS485 communication cable 0.3mm2-2mm2 | |
| AC cable 1mm | 2(17AWG) |




06 Wiring System
GMK110

- Recommended cable connected to the voltage input terminal: 1mm^2 (17AWG).
CT direction: House (K)-->Grid (L).
GMK110D

- Recommended cable connected to the voltage input terminal: 1mm^2 (17AWG).
CT direction: House (K)-->Grid (L).
07 Commissioning
Power ON
Step 1 Connect the smart meter cables.
Step 2 Power on the inverter and ensure it is working properly.
Step 3(Optional) Turn off the circuit breaker on the voltage input side of the meter.
Indicator
| Type Status Description | |
| Steady on Power on. | |
| Off Power off. | |
| Blinking Comm unication is OK. | |
| Off Abnormal or Failed Communication. |
GoodWe Technologies Co., Ltd.