Goodwe GMK110 - Electric meter

GMK110 - Electric meter Goodwe - Free user manual and instructions

Find the device manual for free GMK110 Goodwe in PDF.

📄 92 pages English EN Download 💬 AI Question
Notice Goodwe GMK110 - page 3
Pick your language and provide your email: we'll send you a specifically translated version.

User questions about GMK110 Goodwe

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Electric meter in PDF format for free! Find your manual GMK110 - Goodwe and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. GMK110 by Goodwe.

USER MANUAL GMK110 Goodwe

  • The information in this quick installation guide is subject to change due to product updates or other reasons. All descriptions here are for guidance only.
  • Before installations, read through the quick installation guide.
  • All operations should be performed by trained and knowledgeable technicians who are familiar with local standards and safety regulations.
  • Check the deliverables for correct model, complete contents, and intact appearance. Contact the manufacturer if any damage is found or any component is missing.
  • Strictly follow the installation, operation, and configuration instructions in this guide and user manual. The manufacturer shall not be liable for equipment damage or personal injury if you do not follow the instructions. For more warranty details, please visit https://en.goodwe.com/warranty.

Safety Disclaimer

Goodwe GMK110 - Safety Disclaimer - 1

WARNING

  • Make sure that the device is powered off before any operations.
  • Ensure the cables are connected tightly, securely, and correctly. Inappropriate wiring may cause poor contact or damage the device.
  • No operations while the meter is powered on. Otherwise, it will cause personal injury or damage to the meter. Additional circuit breakers are recommended on the voltage input side of the meter.
  • If the voltage of the power grid fluctuates, resulting in the voltage to exceed 265V, in this case, long-term overvoltage operation may cause damage to the meter. It is recommended to add a fuse with a rated current of 0.5A on the voltage input side of the meter to protect it.
  • In areas at risk of lightning, if the device cable exceeds 10m and wired without grounded metal conduits, you are recommended to use an external lightning protection device.
  • The ingress protection rating of the smart meter is IP20, which is suitable to be installed indoors or inside of the distribution box. For outdoor installation, prepare a waterproof cover (by yourself) to protect the smart meter. Otherwise it will cause damage to the equipment, which is beyond the manufacturer's liability.
  • Warning labels on the smart meter are as follows.
High voltage hazard. Power off the smart meter first before any operations.Potential risks exist. Wear proper PPE before any operations.
Read through the guide before any operations.Equipment protected throughout by DOUBLE INSULATION or REINFORCED INSULATION.
RCM marking. Do not dispose of the productas household waste. Discard the product in compliance with local laws and regulations, or send it back to the manufacturer.
CECE marking. NA NA

Check before Power-on

No. Check Item
1The product is firmly installed at a clean place that is well-ventilated and easy-to-operate.
2The input power cables, CT Cables, and communication cables are connected correctly and securely.
3Cable ties are intact, routed properly and evenly.

Storage

If the equipment is not to be installed or used immediately, please ensure that the storage environment meets the following requirements:

  • Do not unpack the outer package or throw the desiccant away.
  • Store the equipment in a clean place. Make sure the temperature and humidity are appropriate and no condensation.
  • If the smart meter has been long term stored, it should be checked by professionals before being put into use.

02 EU Declaration of Conformity

The module sold in the European market meets the following directives and requirements:

  • Electromagnetic compatibility Directive 2014/30/EU (EMC)
  • Electrical Apparatus Low Voltage Directive 2014/35/EU (LVD)
  • Restrictions of Hazardous Substances Directive 2011/65/EU and (EU) 2015/863 (RoHS)
  • Waste Electrical and Electronic Equipment 2012/19/EU
  • Registration, Evaluation, Authorization and Restriction of Chemicals (EC) No 1907/2006 (REACH)

You can download the EU Declaration of Conformity on https://en.goodwe.com.

03 Technical Parameters

Model GMK110 GMK110D
InputGrid Single-phase
VoltageNominal Voltage-Line to N (Vac)230
Voltage Range (Vac) 85288
Nominal AC Grid Frequency (Hz)50/60
CurrentCurrent Transformer Ratio120A: 40mA
Number of Current Transformers12
Communication RS485
Communication Distance (m) 1000
User interface 2 LED
AccuracyVoltage/Current Class 1
Active Energy Class 1
Reactive Energy Class 2
Power Consumption (W) ≤5
Structural ParametersDimensions (W×H×D mm) 19×85×6
Weight (g) 50
MountingDIN rail
Environment ParametersIngress Protection RatingIP20
Operating Temperature Range (℃)-30~+60
Storage Temperature Range (℃)-30~+70
Relative Humidity (non-condensing)0%~95%
Max. Operating Altitude (m)3000

NOTE

The smart meter is mainly used for power control at the grid-connection point. The measured energy yield and electricity consumption are for reference only and cannot be used as a basis for calculating electricity fees. Electricity fee measurement is subject to the meter provided by the grid company.

01 ПразаMuMepKn

BG

06u oTKa3 OT OTROBOPHOCT

-ИнформацятаВ_TOBa pьКОВоДСТВО 3a 6ьрЗО ИНСТаліраHe ПОДпжи Ha npOMЯHa -nopади akTyaIIIN3aцин Ha пpoДуКТа nIIN dpyrN пPuHn. BcUckn Oписаня ТуК ca caMo 3a opNeHTnp.
- Ппеди Инсталларе, поче тete КраTKOTO рьковдгTO 3a MOтack.
- BcnuKn onepaun Tp6Ba da ce n3BbPWBat OT obyuHn N KOMnTeHTN TeHNu, KOINTO ca 3aNO3HaTN C MeCTHNTe CTaHdAPTN IN PpaBUNa 3a 6e3OnaCHOCT.
- PpOBepTe DoCTaBKeTe 3a npaBnJeH MoJe, NbIHO CbIbPkaHne n HeNoKbTHaT BbHWeH Bd. CbIbPxeTe ce c npOn3BoDnteJra, aKO OTKpnTe NOBpeDa IIN JInca Ha HRAKOJI KOMIOHeHT.
Cn3BaIe cTpIKTHO HNCTpyKcHInTe 3a INHCTaIInpaHe, pa6oTa n KOHfUpypaHe B TOBa pBKOBOdCTBO n B pBKOBOdCTBOTO 3a NOTpe6bnteJI. PpOn3BOdNTeJIr T He Hocn OTROBOPHOCT 3a NOBpeHa Ha O6OpyDBAHeTo IJI N 3a TeLeChn NOBpeJn, aKO He Cn3BaTe INCTpyKcHInTe. 3a NOBeue NpOp6HoCTn OTHOCHO rapaHcIraTa, MoJI, NocTeTe aIpec https://en.goodwe.com/warranty.

Дeкларачnia 3a 6e3oNaCHOCT

Goodwe GMK110 - Дeкларачnia 3a 6e3oNaCHOCT - 1

PPEyPExKDEHNE

  • YBepete ce, ye yctpoiCTBOTo e N3KJIIOUeHo, npei Da N3BbPWBaTe KaKBInTO I da e onepaun.
  • YBepTe ce, ye Ka6eIte ca Cbbp3aHn NlblTHO, cnrypHo n npabuHNo. HenoJxOJaTo Oka6eJIBaHe MoKe Da IOBeDe Do low KOHTaKT IInn Da NOBpeDu yCTPOINCTBOTo.
    He n3BbPbBaIe Oepaun,doKaTo n3MepBaTeHnT ype e noHa npexeHne. B npotnbEn clyuaycnbIecTByBa pNCK OT hapaHraBaHn IIN NOpeDa Ha n3MePBATeHnYpeD.IpnopbUba ce da 6bDat HnCTaInpaHn DoNbHnTeHn IpekbcBauH ot ctpaHaTa Ha BXoHDHTO HApexeHne Ha n3MePBATeHnYpeD.
    Ako HapexeHneTo Ha eIekTpueckata MpeXa Bapnpa, B pe3yltat Ha Koeto HapexeHneTo HadBnShaBa 265 V, B TO3n clyuaN dIbIroCpoUHaT a pa6Ota npi npEHaPexeHne Moxe Da npuHn NOBpeDa Ha I3MePbTeHnYpeD. IpeOpbYBa ce da do6abTe pEpaNTeJ C HomHaJIeH Tok 0,5 A OT cTpaHata Ha BXoDHOTo HapexeHne Ha I3MePbTeHnYpeD, 3a Da rO ppePa3nte.
    B30HcPCKOTMbHNn,akoKa6eJIbTHa yCTpoiCTBOTo HaBnUaBa 10 m n e oka6eJeh 6e33a3eMeHmMetaHn Tpb6oNpOBoOu, npenOpbYBaMe da n3NoI3BaTe BbHsHO yCTPOICTBO 3a3aUNTa OT MbHNn.
  • CTeHNTa Ha 3aUHTa OT npOHKBaHe Ha smart meter e IP20, KoTo e noDxOJa3a INCTaJIIPAhe Ha 3aKpIto IIN BbB BbTpeSHOCTTa Ha pa3npedeJIteJHaTa KUTy. Pn MOHTaX Ha OTKpIto OCnpyte BOHOePOnHuaemo NOKpITne (3aKynBa ce OTdEnHo), 3a Da 3aUHTte INTEJIreHTHna I3MepBaTeJeH ypeI. B npOTuBeH cIyaua TOBa Ue IOBede Do NobpeDa Ha o6OpyDbAHeTo, 3a KoTo npON3BOJnteJrT He Hocn OTROBOPHOCT.
  • П dedуп dedителнite etiketn Bbpx nHTeInreHTHn y3MepBaTeJen ype d ca cneHnTe.

Goodwe GMK110 - PPEyPExKDEHNE - 1
Front View Side view

Bottom view
Goodwe GMK110 - PPEyPExKDEHNE - 2
GMK110:CT1+/CT1-
GMK110D:CT1+/CT1-,CT2+/CT2-

Goodwe GMK110 - PPEyPExKDEHNE - 3
CT

05 Installation

Packing List

Goodwe GMK110 - Packing List - 1
Smart Meter × 1^[1]

Goodwe GMK110 - Packing List - 2
RS485 Communication Terminal x 1

Goodwe GMK110 - Packing List - 3
AC Terminal x 1

Goodwe GMK110 - Packing List - 4
PIN Terminal x 4

Goodwe GMK110 - Packing List - 5

Goodwe GMK110 - Packing List - 6
Screwdriver x 1 Documents x 1

Goodwe GMK110 - Packing List - 7
Installation and Cable Connection

[1]. GMK110: CT × 1; GMK110D: CT × 2.

TypeConductor cross-sectional area
RS485 communication cable 0.3mm2-2mm2
AC cable 1mm2(17AWG)

Goodwe GMK110 - Packing List - 8

Goodwe GMK110 - Packing List - 9

Goodwe GMK110 - Packing List - 10

Goodwe GMK110 - Packing List - 11

06 Wiring System

GMK110

Goodwe GMK110 - Wiring System - 1

  • Recommended cable connected to the voltage input terminal: 1mm^2 (17AWG).
    CT direction: House (K)-->Grid (L).

GMK110D

Goodwe GMK110 - GMK110D - 1

  • Recommended cable connected to the voltage input terminal: 1mm^2 (17AWG).
    CT direction: House (K)-->Grid (L).

07 Commissioning

Power ON

Step 1 Connect the smart meter cables.
Step 2 Power on the inverter and ensure it is working properly.
Step 3(Optional) Turn off the circuit breaker on the voltage input side of the meter.

Indicator

Type Status Description
Steady on Power on.
Off Power off.
Blinking Comm unication is OK.
Off Abnormal or Failed Communication.

GoodWe Technologies Co., Ltd.

Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : Goodwe

Model : GMK110

Category : Electric meter