DAIKIN FWP17CAFN6V3 - Air Conditioning

FWP17CAFN6V3 - Air Conditioning DAIKIN - Free user manual and instructions

Find the device manual for free FWP17CAFN6V3 DAIKIN in PDF.

📄 90 pages English EN Download 💬 AI Question 10 questions ⚙️ Specs
Notice DAIKIN FWP17CAFN6V3 - page 3
Pick your language and provide your email: we'll send you a specifically translated version.
Product type Ducted fan coil unit
Brand Daikin
Model FWP17CAFN6V3
Use Air conditioning (heating and cooling) for civil comfort applications
Power supply 230 V, 1 phase, 50 Hz
Total cooling capacity 6.28 to 7.38 kW (depending on speed)
Heating capacity 6.42 to 7.06 kW (depending on speed)
Nominal air flow 1050 to 1289 m³/h
Useful static pressure 40 to 60 Pa
Power consumption 105 to 162 W
Maximum current consumption 3.52 A
Weight (2-pipe version) 51 kg
Weight (4-pipe version) 53.5 kg
Number of speeds 3 (low, med, high)
Sound level 61 to 69 dB(A) (depending on speed)
Energy class (cooling) A (according to EN 1397)
Energy class (heating) B (according to EN 1397)
Motor type EC inverter brushless (permanent magnet)
Air filter Class G3, washable, acrylic fiber
Heat exchanger coil Standard 3-row (4-row available on request), copper and aluminum
Available accessories Control panels, 2/3-way valves, condensate pump, electric heaters, sensors
Safety Installation by qualified technician, use of PPE, mandatory line switch
Periodic maintenance Cleaning the air filter (every month), cleaning the coil (before each season), checking condensate
Spare parts Original Daikin parts available through authorized installer
User manual 90 pages, available in French and other languages

Frequently Asked Questions - FWP17CAFN6V3 DAIKIN

How to clean the air filter of the Daikin FWP17CAFN6V3?
To clean the air filter, turn off the unit via the line switch. Access the filter through the access panel, remove it, clean it with warm water or compressed air, dry it, then reassemble. This operation should be performed regularly to ensure proper operation of the unit.
What is the required power supply for this fan coil unit?
The unit requires a 230 V, 1 phase, 50 Hz power supply. Connection must be made by a qualified technician, with a line switch and appropriate protection fuse (2 A for this model).
Can I install the Daikin FWP17CAFN6V3 myself?
No, installation and commissioning must be carried out by competent and qualified personnel in accordance with applicable standards. Incorrect installation may cause malfunctions, damage, or safety risks.
What to do in case of water leakage from the unit?
First check that the condensate drain is not blocked. Make sure the unit is correctly tilted (10 mm difference between ends). If the problem persists, contact your installer to check the condensate tray and hydraulic connections.
How to bleed air from the heat exchanger?
Use the bleed valves located next to the hydraulic connections of the exchanger. This operation should be performed by a qualified installer. The presence of air in the exchanger can reduce heating or cooling performance.
What are the sound levels of this unit?
The sound power level varies according to fan speed: from 61 dB(A) at low speed to 69 dB(A) at high speed. These values are measured according to ISO 3741 and ISO 3742 standards.
How to choose the appropriate fan speed?
The unit has three speeds (low, med, high) selectable via the control panel. At low speed, operation is quieter but air flow is reduced. Adjust the speed according to your comfort needs and ambient temperature.
What to do if the unit does not work?
First check the power supply: turn the line switch to ON, check that the circuit breaker has not tripped. If the unit still does not start, inspect the air filter (if clogged, clean it) and make sure no obstacle blocks the intake or discharge. If the problem persists, contact the support service.
How to maintain the heat exchanger coil?
Before each summer season, check the condition of the coil fins. To clean, remove the outlet panel and condensate drain pan, then clean the coil with compressed air or low-pressure steam without damaging the fins. Ensure proper condensate drainage before restarting.
Where to find spare parts for this model?
Original Daikin spare parts are available from authorized installers and authorized service centers. Use only original parts to ensure safety and performance of the unit. Contact your installer for any parts orders.

User questions about FWP17CAFN6V3 DAIKIN

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Air Conditioning in PDF format for free! Find your manual FWP17CAFN6V3 - DAIKIN and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. FWP17CAFN6V3 by DAIKIN.

USER MANUAL FWP17CAFN6V3 DAIKIN

01**Dakir Enepe N.V. is authorised to complete the Technical Construction File.07**H Dakir Enepe N.V. is authorised to complete the Technical Construction File.08 Notes*Low Voltage 2014/35/EU Machinery 2006/42/EC11 Information*engl ### Cogolokats av ###gert Certificate #C#16 Majegies*###2123242526
01**Dakir Enepe N.V. is authorised to complete the Technical Construction File.08Dakir Enepe N.V. is authorised to complete the Technical Construction File.09 Engliuay*cngkogunr o##n c##o##t##n#e de la co#### ##m##f#y12 Merk*som cem berlomer ### agp gionn m#####17 Uwag#zogce ### ducoum##g## ### p#cy22Pasta*232425
01**Dakir Enepe N.V. is authorised to complete the Technical Construction File.08Dakir Enepe N.V. is authorised to complete the Technical Construction File.09 Engliuay*cngkogunr o##n c##o##t##n#e de la co#### ##m##f#y12 Merk*som cem berlomer ### agc gionn m#####17 Uwag#zogce ### ducoum##g## ### p#cy22Pasta*232425
01**Dakir Enepe N.V. is authorised to complete the Technical Construction File.08Dakir Enepe N.V. is authorised to complete the Technical Construction File.09 Engliuay*
01**Dakir Enepe N.V. is authorised to complete the Technical Construction File.08Dakir Enepe N.V. is authorised to complete the Technical Construction File.09 Engliuay*
01**Dakir Enepe N.V. is authorised to complete the Technical Construction File.08Dakir EnePE N.V. is authorised to complete the Technical Construction File.09 Engliuay*
01**Dakir Enepe N.V. is authorised to complete the Technical Construction File.08Dakir EnePE N.V. is authorised to complete the Technical Construction File.09 Engliuay*
02**Dakir Enepe N.V. is authorised to complete the Technical Construction File.08Dakir EnePE N.V. is authorised to complete the Technical Construction File.09 Engliuay*
02**Dakir EnePE N.V. is authorised to complete the Technical Construction File.08Dakir EnePE N.V. is authorised to complete the Technical Construction File.09 Engliuay*
02**Dakir EnePE N.V. is authorised to complete the Technical Construction File.08Dakir EnePE N.V. is authorised to complete the Technical Construction File.
02**Dakir EnePE N.V. is authorised to complete the Technical Construction File.08Dakir EnePE N.V. is authorised to complete the Technical Construction File.
02**Dakir EnePE N.V. is authorised to complete the Technical Construction File.08DakIR EnePE N.V. is ###or###d to complete the Technical Construction File.
02**Dakir EnePE N.V. is ###or###d to complete the Technical Construction File.
02**Dakir EnePE N.V. is ###or###d to complete the Technical Construction File.
02**Dakir EnePE N.V. is ###or###d to complete the Technical Construction File.
02** DAKIR ENE P.N. is ###or###d to complete the Technical Construction File.
02** DAKIR ENE P.N. is ###or###d to complete the Technical Construction File.
02** DAKIR ENE P.N. is ###or###d to complete the Technical Construction File.
02**Dakir ENE P.N. is ###or###d to complete the Technical Construction File.
02** DAKIR ENE P.N. is ###or###d to complete the Technical Construction File.
02** DAKIR ENE P.N. is ###or###d to complete the Technical Construction File.

1 BEFORE STARTING THE INSTALLATION PROCEDURE p.4
2 INTENDED USE p.4 INSTALLATION SITE p.4
3 UNIT DESCRIPTION. p.4
3.1 MODULATION AND EFFICIENCY IN A RECESS CEILING-MOUNTED UNIT .4
3.2 MAIN COMPONENTS.. p.5 ACCESSORIES. p.5
4 DIMENSIONS p.6
5 INSTALLATION. p.6 INSTALLATION REQUIREMENTS. p.6
5.1 ASSEMBLY OF UNITS. p.7
6 CHECKS BEFORE STARTUP. p.7
7 USE p.8
8 MAINTENANCE . p.8 CLEANING THE AIR FILTER. . p.8 CLEANING THE HEAT EXCHANGER . p.8
9 TROUBLESHOOTING. p. 9
10 RATED TECHNICAL DATA p. 10
11 WEIGHTS. p. 11
12 FIGURES. p.82

OPERATING LIMITS

Thermal carrier fluid: water

Water temperature: 5^ C ÷ 90^ C

Air temperature: -20^ ÷ 40^

Control voltage: 230 V

Maximum operating pressure: 16 bar

Limit of room air relative humidity: RH < 85% not

condensing

1 BEFORE STARTING THE INSTALLATION PROCEDURE

Carefully read this manual.

Installation and maintenance should be carried out by technical personnel qualified for this type of machine, in compliance with current safety regulations.

When receiving the unit please check its state verifying if any

damage occurred during the transport.

For installation and use of accessories, please refer to the relative technical sheets.

Identify the model of the FWP-C fan coil following the indications on the packing container.

SAFETY SYMBOLS

DAIKIN FWP17CAFN6V3 - BEFORE STARTING THE INSTALLATION PROCEDURE - 1

Carefully read this manual.

DAIKIN FWP17CAFN6V3 - BEFORE STARTING THE INSTALLATION PROCEDURE - 2

Warning

DAIKIN FWP17CAFN6V3 - BEFORE STARTING THE INSTALLATION PROCEDURE - 3

Use personal protective equipment

USE SUITABLE PPE (GLOVES FOR REFRIGERANT, PROTEC TIVE GOGGLES)

DAIKIN FWP17CAFN6V3 - USE SUITABLE PPE (GLOVES FOR REFRIGERANT, PROTEC TIVE GOGGLES) - 1

WARNING: Electrical and electronic products may not be mixed with unsorted household waste. Do NOT try to dismantle the system yourself: the dismantling of the system, treatment of oil and of other parts must be done by an

authorized installer and must comply with applicable legislation. Units must be treated at a specialized treatment facility for reuse, recycling and recovery. By ensuring this product is disposed of correctly, you will help to prevent potential negative consequences for the environment and human health. For more information, contact your installer or local authority.

ATTENTION: the unit hasn't dangerous components according to the classification of Regulation 1357/2014.

2 INTENDED USE

Daikin will not accept any liability for damage or injury caused as a result of installation by non-qualified personnel; improper use or use in conditions not allowed by the manufacturer; failure to perform the maintenance prescribed in this manual; use of spare

parts other than original factory parts.

Equipment designed for ambient air conditioning and intended for use in civil comfort applications.

INSTALLATION SITE

When choosing an installation site, you should observe the following rules:

The air conditioning unit should not be placed immediately under a socket
- Do not install the unit in places where inflammable gases or powders are present
- Do not expose the unit to sprays of water; do not install the

unit in laundry room

Install the fan coil on walls or ceilings able to withstand its weight. Keep a clear space all around the unit to assure the proper functioning and accessibility for maintenance
- Store the unit in its packing container until you are ready to install it to prevent dust from infiltrating inside it.

3 UNIT DESCRIPTION

MODULATION AND EFFICIENCY IN A RECESS CEILING-MOUNTED UNIT

The range is completed by FWP-C, which uses inverter EC technology in the electric motors. To the features of FWP-C adds the benefits of brushless technology, including a reduction in electricity consumption and consequent reduction in CO_2 emissions, increase in operating flexibility thanks to the modulation of air flow and increase in the level of comfort in terms of temperature, humidity and noise levels.

The range is made up of 8 models with air flows from 300 to 1200 m³/h.

Continuous modulation of the air flow and the use of high-efficiency heat exchangers enables operation also with small air-water temperature differences.

The heat exchangers can also be optimized in the circuit for centralized applications such as district cooling.

MAIN COMPONENTS

Structure

Built from galvanised steel sheet, heat and sound insulated by means of Class 1 self-extinguishing panels. Reduced height to facilitate installation in a horizontal position in a false ceiling. The structure incorporates a drip tray and condensate drain outlet. The main condensate drip tray is situated inside the structure of the unit and is at a positive pressure relative to the drain outlet to facilitate condensate drainage.

Heat exchanger

High efficiency standard with 3 rows, but also available with 4 rows upon request, heat exchanger made with copper piping and aluminium fins blocked to pipings by mechanical expansion, provided with brass manifolds and air vent valve. The heat exchanger usually comes with water connections mounted on the left, but it can be turned by 180^ . High-efficiency heat exchangers optimized for district cooling applications are available on request.

Fans

Double suction centrifugal fans made with ABS or aluminium,

with statically and dynamically balanced forward-curving blades, directly coupled to the electric motor.

EC motor

Permanent magnet motor the unit is equipped with an inverter board to control the motor, that makes it possible to precisely set the maximum rotation speed (control signal 0-10 V).

Air filter

Washable air filter, made of acrylic fibre, filtration class G3, applied on the air intake; may be pulled out from below.

Air intake

Air intake from the front or bottom of the unit, according to system requirements.

Installation example

The bearing structure allows to combine a large range of accessories in suction and air delivery in order to obtain the optimized unit configuration.

ACCESSIONS

Electronic microprocessor control panels with display

FWECSAPCircuit board for FWECS control
FWECSACUser interface with display for FWECS controller
FWEC3AAFWEC3AA electronic controller with display
FWHSKAHumidity sensor for FWE3AA, FWECS
FWTSKAWater sensor for FWE3AA and FWECS controllers
Auxiliary water drip trays, insulating shell, condensate drainage pump
CDRP1A Condensate drainage pump kit
Electrical heating elements
EH Heating element with installation kit, relay box and safety devices
EPIMSB6 Power interface for connecting in parallel up to 4 fan coil units to the one controller
EDPD Auxiliary water drip tray
Valves
2-way valves, ON/OFF or MODULATING actuator, 230 V or 24 V power supply, hydraulic kit, for additional heat exchanger
2-way valve, ON/OFF or MODULATING actuator, 230 V or 24 V power supply, hydraulic kit, for main heat exchanger
3-way valves, ON/OFF or MODULATING actuator, 230 V or 24 V power supply, hydraulic kit, for additional heat exchanger
3-way valves, ON/OFF or MODULATING actuator, 230 V or 24 V power supply, hydraulic kit, for main heat exchanger
2-way valves pressure independent, ON/OFF or MODULATING actuator, 230 V or 24 V power supply, hydraulic kit, for main and additional heat exchanger

Figure p. 82-83 Dimension shows FWP-C dimensional data and position of plumbing connections.

5 INSTALLATION

WARNING: unit installation and start-up must be entrusted to competent personnel and performed in a workmanlike manner, in accordance with current regulations.
WARNING: Install the ducted unit, the line switch (IL) and/or all remote controls in a position out of the reach of persons who are in the bathroom or in the shower.
IMPORTANT: It is advisable to install any accessories on the standard unit prior to positioning the latter, making reference to the technical sheets. The air intake and outlet have a rectangular cross-section, with pre-cut holes for fastening

the available accessories.

The exchanger connections can be switched over to the opposite side by carrying out the following steps (p. 84 Exchanger connections):

remove the upper closing panel.
remove the collecting condensate tray.
remove the heat exchanger module by taking out the fastening screws (2 per side).

turn the heat exchanger by 180^ (on the vertical axis) and screw it back into the unit again.

—reassemble the tray and the upper closing panel.

INSTALLATION REQUIREMENTS

Some rules to follow

—Vent air from the exchanger while the pumps are off. For this purpose use the air vent valves situated next to the exchanger connections.
All ducts, especially the outlet ducts, must be insulated with anti-condensation material.
An inspection panel must be provided in proximity to the unit to enable maintenance and cleaning operations.
The unit must be installed on the basis of design and technical considerations, carrying out an aeraulic assessment and considering the BACK PRESSURE offered by the PIPING applied to the outlet to avoid the problem of failure to change speed: this responsibility cannot fall on the product but on the installation;
Install the unit with the appropriate inspection hatches for routine and special maintenance of the fan coils: for mechanical, electrical and hydraulic replacement;
Install the control panel on the wall; choose an accessible position from where functions may be easily set and which is suitable for taking temperature readings, where applicable. Avoid positions directly exposed to sunlight or direct currents of hot or cold air and make sure there are no obstacles which may preclude a correct temperature reading.

WARNING:

In normal operation, particularly with the fan at minimum speed and ambient air with high relative humidity, condensation may form on the air outlet and on some external parts of the unit.

To avoid such issues while always remaining within the operating limits envisaged for the unit, it is necessary to limit the inlet temperature of the water inside the heat exchanger. In particular, the difference between the air dew point (TA,DP) and the inlet water temperature (T_W) must NOT exceed 14^ , according to the following relationship: TW > T_A,DP - 14^

Example: in the case of ambient air at 25^ with 75% relative humidity, the dew point temperature is about 20^ and therefore the inlet temperature of the water in the battery must be greater then:

  • 20 - 14 = 6^ in order to avoid condensation on a fancoil equipped with a valve.
  • 20 - 12 = 8^ If the valve kit accessory can not be installed.
Fan coil with valve
Air temperature dry bulb (°C)
21232527293133
Relative humidity %40 5555555555555555
50 5555556855556868
60 5555579155559155
70 5568911155551155
80 5668101214161616
90 6810121416181818

Fan coil without valve

Air temperature dry bulb (°C)
21232527293133
Relative humidity %4066666666666666
5066666810666810
60666791166911
706681011131515
8068101212161818
908101214182020

In the event the indoor unit is stopped for a prolonged period, with the fan stopped and circulation of cold water in the heat exchanger, condensation may also form on the unit's exterior. In this case it is advisable to install the 3-way (or 2-way) valve accessory in order to stop the flow of water in the coil when the fan is stopped.

During wintertime periods of shut down, drain water from the system, to prevent ice from forming. If anti-freeze solutions are used, check for their freezing point using the table below.

% Glycol by weightFreezing temperature (℃)Capacity adjustmentPressure drop adjustment
0.01,001,00
10-40.971,05
20-100.921,10
30-160.871,15
40-240.821,20

Electrical connections

Make the electrical connections with the power supply disconnected, in accordance with current safety regulations.

All the wiring must be done by qualified personnel.

For each thermal ventilating unit provide a main circuit breaker (IL), with opening contacts separated by at least 3 mm and an adequate protection fuse (F).

Electrical intakes are shown on the rating labels on the units.

During installation, strictly abide by the indications on the wiring diagram for the unit-control panel combination.

FWP-C + FWEC3A (built-in) p. 86

FWP-C + FWEC3A (separate motor) p. 87

FWP-C + FWECS p.88

NOTE: The electric wires (power and control circuits) must be pulled in through the gland on the side of the electric box where the plumbing connections are located and then connected to the terminals.

WARNING: COMMON motor wire = WHITE, wrong connection may cause serious damages to the motor.

5.1 ASSEMBLY OF UNITS

Mounting the unit

Insert the vibration dampers provided in the 4 slots indicated for ceiling installation

Fasten the base unit to the ceiling or wall using the 4 slots provided.

It is recommended to use 8MA threaded bars plus screw anchors of adequate capacity to bear the weight of the unit, and to prepare the positioning of the unit using 3 8MA bolts (2 in the lower part, 1 in the upper part as shown in figure p.85) and two washers for each bar. Before tightening the lock nut, adjust the main nut so as to assure that the unit is properly inclined so as to facilitate condensate drainage

figure p.85 Condensate discharge).To obtain the proper inclination, tilt the unit so that the intake side is slightly lower (approximately 10mm than the outlet side. Make the plumbing connections to the heat exchanger and, where the cooling function is to be used, to the condensate drainage outlet. Use one of the two tray drain outlets, which can be seen on the outside of the unit side panels

To connect the unit to the drainage line, use a flexible rubber hose and secure it to the pre-selected drain pipe ( 3/8^ ) using a metal clamp (use the drain outlet situated on the plumbing connection side).

6 CHECKS BEFORE STARTUP

  • Check that the unit is installed in such a way as to guarantee the required inclination.
  • Check that the drainage outlet is not clogged (by masonry debris etc.).
  • Check the tightness of the plumbing connections.
    Make sure the electric wires are tightly connected (carry out this check with the power supply OFF).
    Make sure that air has been eliminated from the heat exchanger.
    Power the fan coil and check its performance

7 USE

To use the fan coil refer to the instructions on the control panel available as accessory.

ATTENZIONE: For safety reason, do not introduce your fingers or other pointed objects in the air outlet grilles.
DANGER: The unit may be used by children of at least 8 years of age and by persons with reduced physical, sensory,

or mental capabilities, or who lack experience or the necessary knowledge, provided that they are supervised or after they have received instructions relating to the safe use of the unit and understand the inherent dangers. Children must not play with the unit. Cleaning and maintenance to be carried out by the user must not be performed by unsupervised children.

8 MAINTENANCE

For safety reasons, before carrying out any maintenance or cleaning jobs, turn off the unit by moving the fan speed selector to "Off" and putting off the main switch (0 position).

DANGER! Due caution must be taken while carrying out maintenance: some metal parts may cause injuries; wear protective gloves.

The maintenance requirements of FWP-C ducted units are limited to periodic cleaning of the air filter and heat exchanger and

CLEANING THE AIR FILTER

Disconnect the unit from the power supply by setting the main switch on 0 (OFF).

To clean the air filter proceed as follows:

  1. Access the unit via the inspection panel and take out the air filter as shown in p. 89 Cleaning the air filter:
  2. If the filter is on the inside of the intake grille, remove the

CLEANING THE HEAT EXCHANGER

It is advisable to check the condition of the exchanger before the start of every summer season to make sure that the fins are not obstructed by dirt.

To access the heat exchanger, remove the outlet panel (whether of the type with collars or a rectangular flange) and the drip tray. On reaching the exchanger, clean it with compressed air or low-pressure steam taking care not to damage the fins.

Before the start of every summer season, check the efficiency of condensate drainage.

Adequate periodic maintenance will ensure save both energy and cost savings.

checks on the efficiency of condensate drainage.

Maintenance may be performed only by specialised personnel.

Whenever starting up the unit after it has not been used for a long time, check that there is no air in the heat exchanger.

The motor requires no maintenance since it has self-lubricating bearings.

latter and then proceed to carry out the steps described below.

  1. Clean the filter with warm water or, in the event of dry dust build-up, using compressed air.
  2. Allow the filter to dry and then fit it back in place.
    Air filter dimensions, see figure p. 84.

9 TROUBLESHOOTING

If the unit is not working properly, before calling a service engineer carry out the checks indicated in the table below.

If the problem cannot be solved, contact your dealer or the nearest service centre.

PROBLEM CAUSE SOLUTION
The unit fails to workNo power supply Restore the power supply
The automatic safety cutout has tripped Call a service centre for assistance
The on/off switch is on Start the unit by moving the switch to ON
The unit provides insufficient cooling or heatingThe air filter is dirty or clogged Clean the air filter
An obstacle is obstructing the air intake or outlet Remove the obstacle
Air is trapped inside the heat exchanger Call the installer for assistance
There are open windows and/or doors Close windows and/or doors
The minimum speed has been selected Select medium or maximum speed
The unit "leaks" waterThe unit has not been installed with the correct inclination Call the installer for assistance
The drainage outlet is clogged Call the installer for assistance

2 pipes

FWP-C04 05 06 08
Speedmin med max min med max min med max min med max
Declared speed2,5,7 1,5,7 1,6,7 1,4,7
Control voltage (E) V2,908,009,004,307,508,404,507,408,805,408,309,90
Rated air flow (E) m³/h109246276171275341195360402305532652
Available static pressure(E)Pa105063195077195063175075
Power input(E)W62533102439102635225177
Maximum current absorptionA0,320,600,840,84
Total cooling capacity(1)(E)kW0,931,761,951,291,952,341,592,743,041,983,263,79
Sensible cooling capacity(1)(E)kW0,621,251,390,911,391,661,091,912,11482,482,92
FCCER class(E)A
Water flow(2)l/h161306340222339408274476527343568664
Water pressure drop(2)(E)kPa2563683793811
Heating capacity(3)(E)kW0,881,811,991,331,982,351,592,803,02353,74,31
FCCOP class(E)A
Water flow(3)l/h153315346231345408276488538408644749
Water pressure drop(3)(E)kPa1452572684911
Standard coil - number of rows3343
Total sound power level(4) dB(A)284952395054395054385258
Inlet + radiated sound power level(4)(E) dB(A)264750374852374852365056
Outlet sound power level(4)(E) dB(A)254649364751364751354955
Water content - standard coildm³1,201,202,201,60
Cross-section area of power cables(5)mm²1,001,001,001,00
Power supply cable typeNO7V-K
Safety fuse FA1111
Fuses typegG

FWP-C10111517

Speedmin med max min med max min med max min med max
Declared speed1,6,7,1,6,7,5,6,7,5,6,7
Control voltage (E) V3,40,7,60,8,50,3,40,7,608,50,6,80,7,50,8,30,6,80,7,50,8,30
Rated air flow (E) m³/h333687760333687760105011631289105011631289
Available static pressure(E)Pa125061125061405060405060
Power input(E)W115468115468105128162105128162
Maximum current absorptionA0,910,913,523,52
Total cooling capacity(1)(E)kW2,29,4,34,75,2,51,4,915,35,6,28,6,81,7,38,7,04,7,64,8,28
Sensible cooling capacity(1)(E)kW1,67,3,21,351,1,77,3,453,76,4,64,5,03,5,46,4,96,5,38,5,84
FCEER class(E)AACB
Water flow(2)l/h394753828432850930109411901295122513321448
Water pressure drop(2)(E)kPa27831012131618202326
Heating capacity(3)(E)kW2,54,4,76,5,17,2,63,5,035,49,6,68,7,22,7,80,7,18,7,80,8,46
FCCOP class(E)AABB
Water flow(3)l/h441827898457875955116212561356124813551471
Water pressure drop(3)(E)kPa2783911121416171922
Standard coil - number of rows3434
Total sound power level(4)dB(A)385558385558616369616369
Inlet + radiated sound power level(4)(E) dB(A)365356365356596167596167
Outlet sound power level(4)(E) dB(A)355255355255586066586066
Water content - standard coildm³2,503,302,503,30
Cross-section area of power cables(5)mm²1,001,001,501,50
Power supply cable typeNOV-K
Safety fuse FA1122
Fuses typegG

(1) Water temperature 7^ / 12^ air temperature dry bulb 27^ wet bulb 19^ (47% relative humidity) according to EN1397:2015
(2) Water temperature 7^ C / 12^ C , air temperature dry bulb 27^ C , wet bulb 19^ C (47% relative humidity)
(3) Water temperature 45^ C / 40^ C , air temperature 20^ C
Sound power measured according to standards ISO 3711 and ISO 3712
(5) The shown section is to be considered as the minimum recommended section. The tables must be chosen in compliance with CEI-UNEL 35024/1, standard.
EUROVENT certifed data
Power supply 230-1-50 (V-ph-Hz)

4 pipes

FWP-C 04 05 06 08
Speedmin med max min med max min med max min med max
Declared speed2,5,7 1,5,7 1,6,7 1,4,7
Control voltage (E) V2,90 7,90 8,90 4,50 7,30 8,90 4,50 7,40 8,30 5,40 8,30 9,90
Rated air flow (E) m³/h109 243 270 170 272 336 195 357 398 302 524 642
Available static pressure (E) Pa10 50 63 19 50 77 19 50 63 17 50 75
Power input (E) W625 32 10 23 39 10 26 35 21 50 77
Maximum current absorptionA0,320,600,840,84
Total cooling capacity(1)(E) kW0,93 1,74 1,91 1,28 1,93 2,31 1,59 2,72 3,01 1,95 3,22 3,75
Sensible cooling capacity(1)(E) kW0,62 1,24 1,36 0,90 1,88 1,64 1,09 1,89 2,09 1,47 2,44 2,89
FCER class(E)A
Water flow(2) l/h161 302 333 221 335 404 274 473 522 339 562 656
Water pressure drop(2)(E)kPa2563683793
Heating capacity(3)(E) kW1,14 1,93 2,06 1,55 2,07 2,32 2,09 3,09 3,29 2,80 3,82 4,24
FCCP class(E)A
Water flow(3) l/h100 169 180 136 181 204 183 271 288 245 334 371
Water pressure drop(3)(E)kPa1232332343
Additional coil - number of rows3+13+14+13+1
Total sound power level(4) dB(A)28.49 52.39 50.54 39.50 54.38 52.58
Inlet + radiated sound power level (4)(E)dB(A)26.47 50.37 48.52 37.48 52.36 50.56
Outlet sound power level(4)(E)dB(A)25.46 49.36 47.51 36.47 51.35 49.55
Water content - additional coildm³0,470,470,590,59
Cross-section area of power cables (S)mm²1,001,001,001,00
Power supply cable typeN07V-K
Safety fuse FA1111
Fuses typeg6
FWP-C 10 11 15 17
Speedmin med max min med max min med max min med max
Declared speed1,6,7,1,6,7,5,6,7,5,6,7
Control voltage (E) V3,40,7,60,8,50,3,40,7,60,8,50,6,80,7,50,8,30,6,80,7,50,8,30
Rated air flow (E) m³/h333683755333683755105011631289105011631289
Available static pressure (E) Pa12 50.6112 50.6112 50.6112 50.6112 50.6112 50.6112 50.6112 50.6112 50.6112 50.6112 50.61
Power input (E) W11 54.6711 54.67105 128105 128105 128105 128105 128105 128105 128105 128105 128
Maximum current absorptionA0,910,913,523,52
Total cooling capacity(1)(E) kW2,29,4,32,4,72,2,51,4,88,5,32,6,28,6,81,7,38,7,04,7,64,8,28
Sensible cooling capacity(1)(E) kW1,67,3,19,3,48,1,77,3,43,74,4,64,5,03,5,46,4,96,5,38,5,84
FCER class(E)AACB
Water flow(2) l/h394749822432846925109411901295122513321448
Water pressure drop(2)(E)kPa27831012131618202326
Heating capacity(3)(E) kW3,40,5,17,5,45,3,40,5,17,5,45,6,42,6,73,7,06,6,42,6,73,7,06
FCCP class(E)AACC
Water flow(3) l/h297,452,477,297,452,477,562,589,618,562,589,618
Water pressure drop(3)(E)kPa613.14613.1419.2122.1921.221.001.00
Additional coil - number of rows3+14+13+14+1
Total sound power level(4) dB(A)38.55 58 38.55 58.61 63.69 61 63.69
Inlet + radiated sound power level (4);(E)dB(A)36.53 56 36.53 56.59 61.67 59.61 67
Outlet sound power level(4)(E)dB(A)35.52 55 35.52 55.58 60.66 58.60 66
Water content - additional coildm30,970,970,970,97
Cross-section area of power cables (S)mm31,001,001,501,50
Power supply cable typeNO7V-K.
Safety fuse FA1122
Fuses typegG

(1) Water temperature 7^ / 12^ air temperature dry bulb 27^ wet bulb 19^ (47% relative humidity) according to UN1397:2015
(2)Water temperature 70^ C/12^ C ,air temperature dry bulb 27^ C ,wet bulb 19^ C (47% relative humidity)
(3) Water temperature 65^ C / 55^ C , air temperature 20^ C
Sound power measured according to standards ISO 3741 and ISO 3742
(5)he shown section is to be considered as the minimum recommended section. The cables must be chosen in compliance with CLI-UNLL 35024/1, standard.
IF: EUROVENT cemf ed data
Power supply 230-1-50 (V-ph-Hz)

11 WEIGHTS

FWP-C0405060810111517
2 pipeskg24,425,433,036,045,045,051,051,0
4 pipeskg25,826,834,637,647,547,553,553,5
01**Dakir Nc Europe N.V. is authorized to complete the Technical Construction File.07'H Dakir Europe N.V. has a technical certification in accordance with EN 60335-2:2014, EN 60335-3:2014, EN 60335-3:2014, EN 60335-3:2014, EN 60335-3:2014, EN 60335-3:2014, EN 60335-3:2014, EN 60335-3:2014, EN 61000-3:2014, EN 61000-3:2014, EN 61000-3:2014, EN 61000-3:2014, EN 61000-3:2014, EN 61000-3:2014, EN 61000-3:2014, EN 08"Low Voltage 2014/35/EU Machinery 2006/42/EC **16"Agg: ala dhaqan, aq: ala dhaqan, aq: ala dhaqan, aq: ala dhaqan, aq: ala dhaqan, aq: ala dhaqan, aq: ala dhaqan, aq: ala dhaqan, aq: ala dhaqan, aq: ala dhaqan, aq: ala dhaqan, a 17"16"Cate: as per se: a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal ###carne: a per se: a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal ###18"Dakir Eme N.V. is authorized to complete the Technical Construction File.07"Dakir Eme N.V. has a technical certification in accordance with EN 60335-2:2014, EN 60335-2:2014, EN 60335-2:2014, EN 61000-3:2014, EN 61000-3:2014, EN 61000-3:2014, EN 61000-3:2014, EN 61000-3:2014, EN 61000-3:2014, EN 60335-2:2014, EN 60335-2:2014, EN 61000-3:2014, EN 61000-3:2014, EN 61000-3:2014, EN 61000-3:2014, EN 60335-2:2014, EN 60335-2:2014, EN 60335-2:2014, EN 61000-3:2014, EN 61000-3:2014, EN 61000-3:2014, EN 61000-3 :2014, EN 61000-3 :2014, EN 61000-3 :2014, EN 61000-3 :2014, EN 61000-3 :2014, EN 61000-3 :2014, EN 61000-3 :2014, EN 61 08"Cate: as per se: a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal a lal ###17"Cakir je na akira y riyagzic o opjokizisikisi, be mele klimazatlan, kirkchy chaydy zinie kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai ###18"Cocai je prnnci suprissi arsipssi sih cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cai cui ###19"Cakir je na akira y riyagzic o opjokizisikisi, be mele klimazatlan, kirkchy chaydy zinie kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kia ###18"Cakir je na akira y riyagzic o opjokizisikisi, be mele klimazatlan, kirkchy chaydy zinie kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai kiai k ###19"Cakir je na akira y riyagzic o opjokizisikisi, be mele klimazatlan, kirkchy chaydy zinie kiai kiai kiai kiai kiai kiai kiai kiai kiai k ###18"Cakir je na akira y riyagzic o opjokizisikisi, be mele klimazatlan, kirkchy chayd ###19"Cakir je na akira y riyagzic o opjokizisikisi, be mele klimazatlan, kirkchy chayd ###18"Cakir je na akira y riyagzic o opjokizisikisi, be mele klimazatlan, kirkchy chayd ###19"Cakir je na akira y riyagzic o opjokizisikisi, be mele klimazatlan, kirkchy chayd ###18"Cakirk jnna akira y riyagzic o opjokizisikisi, be mele klimazatlan, kirkchy chayd ###19"Cakir je na akira y riyagzic o opjokizisikisi, be mele klimazatlan, kirkchy chayd ###18"Cakir je na akira y riyagzic o upjokizisikisi, be mele klimazatlan, kirkchy chayd ###19"Cakir je na akira y riyagzic o opjokizisikisi, be mele klimazatlan, kirkchy chayd ###18"Cakir je na akira y riyagzic o opjokizisikisi, be meles klimazatlan, kirkchy chayd ###19"Cakir je na akira y riyagzic o opjokizisikisi, be meles klimazatlan, kirkchy chayd ###18"Cakir je na akira y riyagzic o opjokizisikisi, be meles klimazatlan, kirkchy chayd ###18"Cakir je na akira y riyagzic o opjokizisikisi, be meles klimazatlan, kirkchy chayd ###18"Cakir je na akira ###18"Cakir je na akira y riyagzic o opjokizisikisi, be meles klimazatlan, kirkchy chayd ###18"Cakir je na akira y riyagzic o opjokizisikisi, be meles klimazatlan, kirkchy chayd ###18"Cakirk jnna akira y riyagzic o opjokizisikisi, be meles klimazatlan, kirkchy chayd ###18"Cakir je na akira y riyagzic o opjokizisikisi, be meles klimazatlan, kirkchy chayd ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meles klimazatlan, kirkchy chayd ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meles klimazatlan, kirkchy chayd ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meales klimazatlan, kirkchy chayd ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meles klimazatlan, kirkchy chayd ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meles klimazatlan, kirkch ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meles klimazatlan, kirkchy chayd ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meles klimazatlan, kirkchy chayd ###18"Cakirk jnna akira y riyagzic o upjokizisikisi, be meles klimazatlan, kirkchy chayd ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meles klimazatlan, kirkchy chayd ###18"Cakir je na akira y riyagzic o opjokizisikisi, be meles klimazatlan, kirkchy chayd ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meales klimazatlan, kirkchy chayd ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meales klimazatlan, kirkchy chayd ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meales klimazatlan, kirkch ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meales klimazatlan, kirkchy chayd ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meales klimazatlan, kirkchy chayd ###18"Cakirk jnna akira y riyagzic o upjokizisikisi, be meles klimazatlan, kirkchy chayd ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meles klimazatlan, kirk ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meles klimazatlan, kirkchy chayd ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meles klimazatlan, kirkch ###18"Cakir je na akir ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meles klimazatlan, kirkchy chayd ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meles klimazatlan, kirkch ###18"Cakir je na akirl ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meles klimazatlan, kirkch ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meles klimazatlan, kirkch ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meles klimazatlan, kirkch ###18"Cakir je na akira y riy agzic o upjokizisikisi, be meles klimazatlan, kirkch ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meles klimazatlan, kirkch ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meles klimaz ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meles klimaz ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meles klimaz ###18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meles klimaz ###18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cakirk jnna akira y riyagzic o upjokizisikisi, be meles klimaz ###18"Cakir je na akira y riyagzic o upjokizisikisi, be meles klimaz ###18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cakir je nna akira y riyagzic o upjokizisikisi, te ###18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cakir je na akira y riyagzic oupjokizisikisi, te ###18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cakir je na akira y riyagzic o upjokizisikisi, te #18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cakir je nna akira y riyagzic o upjokizisikisi, te ###18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cacik ###18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cakik ###18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cacik ###18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cakir je nna akira y riyagzic o upjokizisikisi, te ###18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cuk ###18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cakk ###18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cakir je na akira y riyagzic o upjokizisikisi, te ###18"Cakk ###18"Cakir je na akira y riyagzic o upjokizisikisi, t ###18"Cakk ###18"Cakk ###18"Cakk ###18"Cakk ###18"Cakk ###18"Cakk ###18"Cakk ###18"Cakk ###18"Cakk ###18"Cakk ###18"Cak ###18"Cak ###18"Cak ###18"Cak ###18"Cak ###18"Cak ###18"Cak ###18"Cak ###18"Cak ###18"Cak ###18"Cak ###18"Cak\N ###18"Cak ###18"Cak ###18"Cak ###18"Cak ###18"Cak ###18"Cak ###18"Cak ###18"Cak ###18"Cak ###18"Cak ###18"Cak

1 PRIMA DI INIZIARE L'INSTALLAZIONE .p.14
2 UTILIZZO PREVISTO .p.14

LUOGOD INSTALLAZIONE .p.14

3 DESCrizIONE DELL'APPARECCHIO p.14

3.1 MODULAZIONE ED EFFICIENZA AD INCASSO A SOFFITTO .p.14
3.2 COMPONENTI PRINCIPALI.. .p.15 ACCESSORI .p.15
4 DATI DIMENSIONALI. p.16

9 RICERCA DEI GUASTI

Lire attentivement le present manuel.

01**Dakir Enepe N.V. is authorised to complete the Technical Construction File.07'H Dakir Enepe N.V. is authorised to complete the Technical Construction File.08'H Dakir Enepe N.V. is authorised to complete the Technical Construction File.09'H Dakir Enepe N.V. is authorised to complete the Technical Construction File.10'Dakir Enepe N.V. is authorised to complete the Technical Construction File.11'Dakir Enepe N.V. is authorised to complete the Technical Construction File.12'Dakir Enepe N.V. is authorised to complete the Technical Construction File.13'Dakir Enepe N.V. is authorised to complete the Technical Construction File.14'Dakir Enepe N.V. is authorised to complete the Technical Construction File.15'Dakir Enepe N.V. is authorised to complete the Technical Construction File.16'Dakir Enepe N.V. is authorised to complete the Technical Construction File.17'Dakir Enepe N.V. is authorised to complete the Technical Construction File.18'Dakir Enepe N.V. is authorised to complete the Technical Construction File.19'Dakir Enepe N.V. is authorised to complete the Technical Construction File.20'Dakir Enepe N.V. is authorised to complete the Technical Construction File.21'Dakir Enepe N.V. is authorised to complete the Technical Construction File.22'Dakir Enepe N.V. is authorised to complete the Technical Construction File.23'Dakir Enepe N.V. is authorised to complete the Technical Construction File.24'Dakir Enepe N.V. is authorised to complete the Technical Construction File.25'Dakir Enepe N.V. is authorised to complete the Technical Construction File.26'Dakir Enepe N.V. is authorised to complete the Technical Construction File.27'Dakir Enepe N.V. is authorised to complete the Technical Construction File.28'Dakir Enepe N.V. is authorised to complete the Technical Construction File.29'Dakir Enepe N.V. is authorised to complete the Technical Construction File.30'Dakir Enepe N.V. is authorised to complete the Technical Construction File.31'Dakir Enepe N.V. is authorised to complete the Technical Construction File.32'Dakir Enepe N.V. is authorised to complete the Technical Construction File.33'Dakir Enepe N.V. is authorised to complete the Technical Construction File.34'Dakir Enepe N.V. is authorised to complete the Technical Construction File.35'Dakir Enepe N.V. is authorised to complete the Technical Construction File.36'Dakir Enepe N.V. is authorised to complete the Technical Construction File.37'Dakir Enepe N.V. is authorised to complete the Technical Construction File.38'Dakir Enepe N.V. is authorised to complete the Technical Construction File.39'Dakir Enepe N.V. is authorised to complete the Technical Construction File.40'Dakir Enepe N.V. is authorised to complete the Technical Construction File.41'Dakir Enepe N.V. is authorised to complete the Technical Construction File.42'Dakir Enepe N.V. is authorised to complete the Technical Construction File.43'Dakir Enepe N.V. is authorised to complete the Technical Construction File.44'Dakir Enepe N.V. is authorised to complete the Technical Construction File.45'Dakir Enepe N.V. is authorised to complete the Technical Construction File.46'Dakir Enepe N.V. is authorised to complete the Technical Construction File.47'Dakir Enepe N.V. is authorised to complete the Technical Construction File.48'Dakir Enepe N.V. is authorised to complete the Technical Construction File.49'Dakir Enepe N.V. is authorised to complete the Technical Construction File.50'Dakir Enepe N.V. is authorised to complete the Technical Construction File.51'Dakir Enepe N.V. is authorised to complete the Technical Construction File.52'Dakir Enepe N.V. is authorised to complete the Technical Construction File.53'Dakir Enepe N.V. is authorised to complete the Technical Construction File.54'Dakir Enepe N.V. is authorised to complete the Technical Construction File.55'Dakir Enepe N.V. is authorised to complete the Technical Construction File.56'Dakir Enepe N.V. is authorised to complete the Technical Construction File.57'Dakir Enepe N.V. is authorised to complete the Technical Construction File.58'Dakir Enepe N.V. is authorised to complete the Technical Construction File.59'Dakir Enepe N.V. is authorised to complete the Technical Construction File.60'Dakir Enepe N.V. is authorised to complete the Technical Construction File.61'Dakir Enepe N.V. is authorised to complete the Technical Construction File.62'Dakir Enepe N.V. is authorised to complete the Technical Construction File.63'Dakir Enepe N.V. is authorised to complete the Technical Construction File.64'Dakir Enepe N.V. is authorised to complete the Technical Construction File.65'Dakir Enepe N.V. is authorised to complete the Technical Construction File.66'Dakir Enepe N.V. is authorised to complete the Technical Construction File.67'Dakir Enepe N.V. is authorised to complete the Technical Construction File.68'Dakir Enepe N.V. is authorised to complete the Technical Construction File.69'Dakir Enepe N.V. is authorised to complete the Technical Construction File.70'Dakir Enepe N.V. is authorised to complete the Technical Construction File.71'Dakir Enepe N.V. is authorised to complete the Technical Construction File.72'Dakir Enepe N.V. is authorised to complete the Technical Construction File.73'Dakir Enepe N.V. is authorised to complete the Technical Construction File.74'Dakir Enepe N.V. is authorised to complete the Technical Construction File.75'Dakir Enepe N.V. is authorised to complete the Technical Construction File.76'Dakir Enepe N.V. is authorised to complete the Technical Construction File.77'Dakir Enepe N.V. is authorised to complete the Technical Construction File.78'Dakir Enepe N.V. is authorised to complete the Technical Construction File.79'Dakir Enepe N.V. is authorised to complete the Technical Construction File.80'Dakir Enepe N.V. is authorised to complete the Technical Construction File.81'Dakir Enepe N.V. is authorised to complete the Technical Construction File.82'Dakir Enepe N.V. is authorised to complete the Technical Construction File.83'Dakir Enepe N.V. is authorised to complete the Technical Construction File.84'Dakir Enepe N.V. is authorised to complete the Technical Construction File.85'Dakir Enepe N.V. is authorised to complete the Technical Construction File.86'Dakir Enepe N.V. is authorised to complete the Technical Construction File.87'Dakir Enepe N.V. is authorised to complete the Technical Construction File.88'Dakir Enepe N.V. is authorised to complete the Technical Construction File.89'Dakir Enepe N.V. is authorised to complete the Technical Construction File.90'Dakir Enepe N.V. is authorised to complete the Technical Construction File.91'Dakir Enepe N.V. is authorised to complete the Technical Construction File.92'Dakir Enepe N.V. is authorised to complete the Technical Construction File.93'Dakir Enepe N.V. is authorised to complete the Technical Construction File.94'Dakir Enepe N.V. is authorised to complete the Technical Construction File.95'Dakir ENEPE N.V. 1-1-2013/EC: 2014/11: 2015, EN60335-2-40: 2005/A1: 2012: 2009, EN55014-1: 2008 + A1: 2010 + A2: 2012, EN55014-2: 1998 + A1: 2002 + A2: 2009, EN55014-2: 2008 + A1: 2010 + A2: 2012, EN55014-2: 2008 + A1: 2010, EN6000-3-3: 2013, EN61000-3-2: 2013, EN61000-3-3: 2013, EN61000-3-2: 2011, EN61000-4: 2011, EN61000-4: 2011, EN61000-4: 2011, EN61000-4: 2011, EN61000-4: 2011, EN61000-4: 2011, EN61000-4: 2011, EN60335-2-40: 2005/A1: 2012: 2009, EN55014-1: 2008 + A1: 2010 + A2: 2012, EN55014-2: 1998 + A1: 2002 + A2: 2009, ENEC 2006/3-3: 2013, EN61000-3-3: 2013, EN61000-3-3: 2013, EN61000-3-3: 2013, EN61000-3-3: 2013, EN61000-3-3: 2013, EN61000-3-3: 2013, EN610O0-3: 2013, EN61000-3-3: 2013, EN61000-3-3: 2013, EN61000-3: 2013, EN61000-3: 2013, EN61000-3: 2013, EN61000-3: 2013, EN61000-3: 2013, EN61000-3: 2013, EN61000-3: 2013, ENEC 2006/3-3: 2013, EN61000-3: 2013, EN61000-3: 2013, EN61000-3: 2013, EN61000-3: 2013, EN61000-3: 2013, EN61000-3: 2013
01**Dakir Europe N.V. is authorized to complete the Technical Construction File.07**H Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-1998, EN 60335-1998, EN 60335-1998, EN 60335-1998, EN 60335-1998, EN 60335-1998, EN 60335-1998, EN 60335-1998, EN 6033513Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-1998, EN 60335-1998, EN 60335-2014, EN 60335-2014, EN 60335-1998, EN 60335-2014, EN 60335-2014, EN 60335-1998, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-1998, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 6033513Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-213Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 6C335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-201413Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-201413Dakir Europe N.V. has a technical certification in accordance with EN 60
01**Dakir Europe N.V. is authorized to complete the Technical Construction File.07**H Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 6033513Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-213Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-201413Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-201413Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-201413Dakir Europe N.V. has aTechnical certification in accordance with EN 60335-2014, EN 60335-201413Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-201413Dakir Europe N.V. has a technical certification in accordance with EN 60335-213Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-201413Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-201413
01**Dakir Europe N.V. is authorized to complete the Technical Construction File.07**H Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-201413Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-201413Dakir Europe N.V. has a technical certification in accordance with EN13Dakir Europe N.V. has a technical certification in accordance with EN13Dakir Europe N.V. has a technical certification in accordance with EN13Dakir Europe N.V. has a technical certification in accordance with EN13Dakir Europe N.V. has a technical certification in accordance with EN13Dakir Europe N.V. has a technical certification in accordance with EN13
01**Dakir Europe N.V. is authorized to complete the Technical Construction File.07**H Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-201413Dakir Europe N.V. has a technical certification in accordance with EN 60335-2008, EN 60335-201413Dakir Europe N.V. has a technical certification in accordance with EN13Dakir Europe N.V. has a technical certification in accordance with EN13Dakir Europe N.V. has a technical certification in accordance with EN13Dakir Europe N.V. has a technical certification in accordance with EN13Dakir Europe N.Vhas a technical certification in accordance with EN13Dakir Europe N.V. has a technical certification in accordance with EN13
01**Dakir Europe N.V. is authorized to complete the Technical Construction File.07**H Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-201412Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-201412Dakir Europe N.V. has a technical certification in accordance with EN12Dakir Europe N.V. has a technical certification in accordance with EN12Dakir Europe N.V. has a technical certification in accordance with EN12Dakir Europe N.V. has a technical certification in accordance with EN12Dakir Europe N.V. has a technical certification in accordance with EN12Dakir Europe N.V. has a technical certification in accordance with EN12
01**Dakir Europe N.V. is authorized to complete the Technical Construction File.07**H Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-201412Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, ETS-CONTERNOVIAI12Dakir Europe N.V. has a technical certification in accordance with EN12Dakir Europe N.V. has a technical certification in accordance with EN12Dakir Europe N.V. has a technical certification in accordance with EN12Dakir Europe N.V. has a technical certification in accordance with EN12Dakir Europe N.V. has a technical certification in accordance with EN12
01**Dakir Europe N.V. is authorized to complete the Technical Construction File.07**H Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-201412Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, FIS-CONTERNOVIAI12Dakir Europe N.V. has a technical certification in accordance with EN12Dakir Europe N.V. has a technical certification in accordance with EN12Dakir Europe N.V. has a technical certification in accordance with EN12Dakir Europe N.V. has a technical certification in accordance with EN12Dakir Europe N.V. has a technical certification in

1 PRD ZAHAJENIM INSTALACE .p.54
2 ZAMYSLENE POUZITI. p. 54

MISTO INSTALACE .p.54

3 POPIS ZARIZENI p.54

3.1 MODULACE A UCCINNOST STROPNI INSTALACE...p.54
3.2 HLAVNI SOUČÁSTI .p.55
PRISLUŠENSTVI .p.5

4 ROZMEROVÉ UDAJE p.56
5 INSTALACE .p.56

POKNY K INSTALACI .p.56

5.1 MONTAZ JEDNOTKY.. p. 57

6 FUNKCNI KONTROLA p.57
7POUZITI p.58
8 UDRZBA p.58

CISTENI VZDUCHOVEHO FILTRU .p.58

CISTENI VYMENIKU TEPLA. p.58

9 RESENI PROBLEMU .p.59
10 JMENOVITÉ TECHNICKÉ UDAJE. .p.60
11 HMOTNOSTI. p.61
12 OBRAZKY. p.82

1 PřED ZAHÁJENÍM INSTALLACE

MODULACE A UČINNOST STROPNI INSTALACE

01**Dakir Europe N.V. is authorized to complete the Technical Construction File.07**H Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-1998, EN 60335-1998, EN 60335-1998, EN 60335-1998, EN 60335-1998, EN 60335-1998, EN 60335-1998, EN 60335-1998, EN 6033513Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-1998, EN 60335-1998, EN 60335-2014, EN 60335-2014, EN 60335-1998, EN 60335-2014, EN 60335-2014, EN 60335-1998, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-1998, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 6033513Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-213Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 6C335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-201413Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-201413Dakir Europe N.V. has a technical certification in accordance with EN 60
01**Dakir Europe N.V. is authorized to complete the Technical Construction File.07**H Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 60335-2014, EN 6033513Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-213Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-201413Dakir Europe N.V. has a technical certification in accordance with EN 60335-2014, EN 60335-201413Dakir Europe N.V. has a technical certification in accordance with EN 60335-201413Dakir Europe N.V. has a technical certification in accordance with EN 60335-201413Dakir Europe N.V. has a technical certification in accordance with EN 60335-201413Dakir Europe N.V. has a technical certification in accordance with EN 60335-213Dakir Europe N.V. has a technical certification in accordance with EN 60335-213Dakir Europe N.V. has a technical certification in accordance with EN 60335-213Dakir Europe N.V. has a technical certification in accordance with EN 60335-213Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EN 60335-213Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLAT UR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUL13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUT13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATU13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUU13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATURA13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATIR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATOR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATIT13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATIUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATT13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATOTUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLTUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLAUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLAPUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATOUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATEUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATAUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATIOUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATICUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATORU13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATIC UR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATICORU13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATORUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLACURU13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLACORU13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLTUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLACTUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLALATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLATUR13Dakir Europe N.V. has a technical certification in accordance with EINNOVOLTUR

DAIKIN

DAIKIN EUROPE N.V.

Ostend, 14th of December 2020

DAIKIN FWP17CAFN6V3 - DAIKIN EUROPE N.V. - 1

2PW59562-11F

1 PRIJE POÇETKA INSTALLACIJE p.64
2 NAMIJENJENA UPORABA .64

MJESTO UGRADNJE .p.64

3 OPIS UREDAJA p.64

3.1PODESAVANJE IUCINKOVITOSTPRILIKOM UGRADNJEU STROP.. .p.64
3.2 GLAVNE KOMPONENTE .p.65 OPREMA .p.65
4 PODATCI O DIMENZIJAMA .p.66
5 UGRADNJA. p.66

UPOZORENJA O INSTALACIJ. p.66

5.1 MONTAZAJEDINICE.. .p.67
6 FUNKCIONALNA PROVJERA .p.67
7 KORISTENJE p.68
8 ODRZAVANJE .p.68

CIScENJE FILTRA ZRAKA. p.68

CISCENE ZAVOJNICE IZMJENJIVACATOPLINE.....p.68

9 RJESAVANJE KVAROVA p.69

10 NAZIVNI TEHNICKI PODATCI p.70

11 TEZINE .p.71
12 SLIKE. .p.82

OGRANICENJA RADA

Tekucina za prijenos topline: voda

Temperatura vode: 5^ ÷ 95^

Temperatura zraka: -20^÷ 40^

Napon napajan: 230V + / - 10%

Maksimalni radni tlak: 16 bara

Ogranicenje relativne vlažnosti zraka iz okoline:

RH<85%nekondenzirajuce

1 PRIJE POČETKA INSTALLACIJE

Ostend, 14th of December 2020

DAIKIN FWP17CAFN6V3 - PRIJE POČETKA INSTALLACIJE - 1

2PW59562-11F

1 A TELEPITES MEGKEZDESE ELOTTP. 14

2 RENDELTETESSZERU HASZNALAT

TELEPITES HELYE. p.74

3 A BERENDEZÉS LEIRÁSA. p. 74

3.1 MODULACIO ES NAGY HATASFOK MENNYEZETBE SULLYESZTVE. .p.74
3.2 FO EGYSEGEK. p.75

TARTOZEKOK. p.75

4 MERET ADATOK. p.76

5 TELEPITES p.76

TELEPITESREVONATKOZOFIGYELMEZTETESEK....p.76

5.1 EGYSEG OSSZESZERELESE .p.77

6 FUNKCIONALIS ELLENORZES p.77

7 HASZNALAT. p.78

8 KARBANTARTAS. p.78

LEGSZUROTISZITASA .p.78

HOCSERLOBLOKKTISZITASA p.78

9 HIBAKERESÉS .p.79

10 NÉVLEGES MÜSZAKI ADATOK. p. 80
11 TÖMEG ADATOK. p. 81
12 ABRA. p.82

ÜZEMI HATÄRÉTÉKEK

1 Water connections standard heat exchanger 2 Water connections additional heat exchanger
3 Condensate discharge

Leyenda

1 Water connections standard heat exchanger
2 Water connections additional heat exchanger
3 Condensate discharge

Legenda

Bsu=red motor inorty//Buln=ntual motor norty//Buln=nutral motor norty//Buln=neutral motor norty//Buln=neutral motor norty//Buln=neutral motor norty//Buln=neutral motor norty

COM公用o 107/ COM Common outout for 107/OUTS// COM Communorties 107// COM Gernersam Auspase 107// COM Comin salicas 107// COM Socledr vipu 107// COM Zajeedzizluz 107// COM Klae kimeret-107/

BNAe=bsmeipnntf/BBw=meiortmchase//BN/Anon=chase moteinr / BN Bana=n phase inerter motn//BN Anon=n fse motor inerster / BN Smede=fzirrserkmoa/BN Ean=n inerter motio

GYNEStdiVoe=IaIIF/7/GYNErceqwn=GnrePf//GYNE1ae/2=IeF/P//GYNEGcHgSmn=FeE/P//GYNEAmalNvck=Tea(P//GYNEAunlndc=Tea(P//GYNEpdsctro=ddk(FF)

RD Rass = sepal 0-10V / RD Red = C-136 signal / RD Roge = siqal0-10V / RD Roj - Signal0-30V / RD Rojo - selal0-10V // RD Cremon = siqal0-10V // RD Cremon = siqal0-30V / RD Pims - jebs 0-10V

SW Sonca acqa / SW Water probe / SW Sonca de aqua / SW Vodin sende / SW Sonda vode / SW Zsponda

SU Sunda. iridia / SU H. midiy probe / SU Sondne hnuite / SU Lechitgeisliner / SU Sunda de humedad / SU Vhizotri sonda / SU Sona tainzoe / SU Piraataa manda

BN (L2 FLIT) Morco = loca B fttn / BN (L2 FLIT) Ecor = fttn / BN (L2 FLIT) Pcur = linp / BN / BN (L2 FLIT) Pcur = Lcogn / BN / BN (L2 FLIT) Pcur = inca nema/ BN / BN (L2 FLIT) Pcur = vedan / BN (L2 FLIT) Sone = Injua U, 2/3bn / BN (L2 FLIT)

BN (N4 F1T) 5nne nol fio / BN (N4 F1T) 3e - nre / BN (N4 F1T) Bn = ne nel / BN (N4 F1T) 6a = nne nema / BN (N4 F1T) 7d = ne nal / BN (N4 F1T)

FILT@ck=cmc:R s#e

BK (U1 FHT) Sep-lines OUT time / BK (U1 FHT) Bhat - filter OUT time / BK (U1 FHT) Naur - light OUT time / BK (U1 FHT) Schwann - running OUT time / BK (U1 FHT) cemab = cemabOUT time / BK (U1 FHT) Cno = cnoOUT time / BK (U1 FHT)

kke=emc00

BU (U3 FUT) BLU = nucuCU fTn / BU (U3 FUT) EBL = fucuC01 nucu/ / BU (U3 FUT) EBL = nucuC01 fTn / BU (U3 FUT) BOL = nucuC01 fTn / BU (U3 FUT) BOL = nucuC01 fTn / BU (U3 FUT) BOL = nucuC01 fTn / BU (U3 FUT)

(U3FIL)

FWEC3A wiring diagram with separated Inverter motor - Schema elektrico FWEC3A con Inverter separato - Connexion elektrique FWEC3A avec moteur inverseur sépare - FWEC3A mit separatem Umrichtermotor - Conexión eletrica FWEC3A con motor inverter separado - Schéma zapojeni FWEC3A se samostatnym menicem - Shema oizichenja FWEC3A s odvojenim inverterskim motorom - FWEC3A Kapcsolási rajk könin inverterrel

DAIKIN FWP17CAFN6V3 - Legenda - 1

Legendeschemie eletrici:/ / Elecrical wiring diagram legend:/ / Legendescheses/electriques:/ / Legende Schaltplan:/ Leyenda esquemas elctricos:/ / Legendy elektrickych schemat:/ Pojajsjenja sheme oiziena:/ Elektromos kapcsolasi rajzok jegyzeke:

... Collegamenti eletrici a cura dell'installatore // ... Wiring made by supplier // ... Branchements électriques incombatté à l'installateur // ... Stromanschlüsse seitents des Kunden // ... Conexiones électricas a cargo del instalador // ... Elektrická pripojeni providença montañzni firmou // ... Elektrici príklučiti koje treba príklujčiti instalater // ... Az elektromos bekoltešek a beszereló feladatkörébe tartoznak

LFace//LPhase//LPhase//LFace//LFace//LFace//LEmns

BU Bui = neutro motore inver / BU Blue = neutral inver moto / BU Bliu = neutr motor inver / BU Blau = neutr motor inver / BU Biai = neutral motor inver / BU Biai = Neutral invernted motor / BU Biai = Invert rmatior

COMComuneLsata0104//COMComnunctourfo104outus//COMCommnurssoryo104//COMGemeimamooinee0104//COMComunrslides3104//COMSpovtnvspu3104//COMTaednlstg0104//COMKcsinnemero104

Bn Manoe 105

RD Ress = seqrae 0-10V / RD Red = 0-10V signal / RD Rouge = signal 0-10V / RD Red = serial 0-10V / RD Rouge = serial 0-10V / RD Rouge = serial 0-10V / RD Rouge = serial 0-10V / RD Rouge = serial 0-10V / RD Rouge = serial 0-10V / RD Rouge = serial 0-10V / RD Rouge = serial 0-10V / RD Rouge = serial 0-10V / RD Rouge = serial 0-10V / RD Rouge

SW Sonca acqua / SW Water probe / SW Sonceau / SW Wasserbefühler / SW Sonde de agua / SW Wutzindersonde / SW Sonder vode / SW Vizcgonca

SU Scoraurniia / SU Urnity probe / SU Sando huridite / SU Feuchngltschie / SU Sando de Hurnedad / SU Ullkostni sord / SU Sonataa/ Rost / SU Rinalatralen vand

SA Sonda and / SA Purope // SA Scone ar // SA Lutner // SA Sonde de an // SA 2duchow sonde // SA Sonda zraia // SA Leveg sonda

EMC FILTER filto pridctioa / EMC FILTER poet fll / EMC FILTER filte antiintercences / EMC FILTER linstnngfll / EMC FILTER filrantnticnncies / EMC FILTER filo tum / EMC FILTER filer 1 / EMC FILTER

A/B/GNDRS487/A/B/GNDRS487/A/B/GNDRS487/A/B/GNDRS487/A/B/GNDRS487

BN (L2 FILT) Bamonie=lines B Filtr / BN (L2 FILT) Bamon = liter Bltn / BN (L2 FILT) Bamon = ligne Bltn / BN (L2 FILT) Bamon = line ntes extra filto / BN (L2 FILT) Hnki = vender Vfith / BN (L2 FILT) Smede = linu UL4/2 hcn / BN (L2 FILT)

BN (N4 FILT) Blut -n tio / BN (N4 FILT) Blut - fiter / BN (N4 FILT) Btu - n e- tio/17 / BN (N4 FILT) Btu - Neutroliter / BN (N4 FILT) 7 and - n e- tio/17 / BN (N4 FILT) Wot - n e- tio/17 / BN (N4 FILT) Pao - n e- tio/17 / BN (N4 FILT)

BK (U1 FILL) Non=lnca01 fll / BK (U1 FILL) Bad = fll U1 fll / 8K (U1 FILL) Bad = qncu01 fll / 8K (U1 FILL) schzse=ztung U1 fll / BK (U1 FILL) Negp=lnca tida filtra// BK (U1 FILL) Cnra = veldcu Filtra // BK (U1 FILL) Cnra = linja d24 fll / BK (U1 FILL) Feltke-olal cull OJt

BU (U3 FIL) 3u =neurocut filr / BU (U3 FIL) 3ue = nurecut netra / BU (U3 FIL) 3eu = neutre U3 frc / BU (U3 FIL) 3au = Neutralee/CUT filr / BU (U3 FIL) bcd = nactn CUT filr / BU (U3 FIL) Pavo = neunnoLAL ZI / BU (U3 FIL) Ks= vengpsCUT

Wiring diagram FWECS - Schema eletrico FWECS - Conexión electrónica FWECS - Elektrischer Anschluss FWECS - Conexión electrónica FWECS - Schéma zapo-jeni FWECS - Shema oizénja FWECS - Elektromos Kapcsolási, FWECS

DAIKIN FWP17CAFN6V3 - Legenda - 2

Electrical wiring diagram legend:

V0 Inverter motor power supply

L Phase

PE Ground

N Neutral

CN Terminal board connector F Fuse (not supplied)

IL Circuit breaker (no. supplied):

... Wirings made by supplier

WH White = common

BK Black = GND inverter

BU Blue = inverte: neutral motor

VC Cooling mode - so enoid valve

VH Heating mode: splenoid valve

D01 Digital oudet 1

D02 Digital outlet 2

102 Doutc 0 C

101OutletC-1CVI

COM Commnoulet 10-10y

BN Brown = Inverter motor phase

C012 Common digital outlet

GYNE Yellow/green = around (FE)

RDRed=0-10V signal

RE Electric heater

SW Water sensor

SU Umidity sensor

SA Air sensor

DI Digital intet 1

D12 Digital Inlet 2

C12 Common digital inlet

A/B/GND RS485

BU 1 =neutrophilinser

VC Vanne solenoiderafaiichissment

VH Vannesolenoidechaufage

D01 Sortie numnncse1

COM Common series-10V

WH Weil = Gemeinsame

BK Schwarz = CND inverter

BU Blau = neutra mator inverter

VC Solenoidveri Kalien

VH Soenocvent Hezen

D01 Digitalausgang

D02 Digitalausgang 2

102 Ausgang 0 109 2

101 Ausgang 0-1097

COM Gereansart Asyange 0-10V

BN Baur=phase inverter motor

BU Wccra =neutr mator

meiie

BU Plavo = Neutralan inverter

ski motor

VC Sclenoidiventillatafne

VH Solenovienil Gjane

D01 Ditanlizaz

DO2 Digitlndg2

102 1g20-0092

10112a010V1

COM Zajedniki Izlaz 0-10V

BN Smede = Faza inverterskog

motora

RD Crveno = signal 0-10V

RE Ekerinotpc

SW Sonda vode

SU Sonda vlažnosti

SA Sonda zraka

D1 Dicantiulz

D12 Digitaniulat

C127aechnikidgtdinr

A/B/GND 15:35

Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : DAIKIN

Model : FWP17CAFN6V3

Category : Air Conditioning