AR5504 - Beard trimmer Arzum - Free user manual and instructions
Find the device manual for free AR5504 Arzum in PDF.
| Product Type | Beard Trimmer |
| Brand | Arzum |
| Model | AR5504 |
| Power Supply | Input: 100-240 V ~ 50/60 Hz 0.2 A; Output: 5.0 V ⎓ 1000 mA |
| Battery Type | Rechargeable (Ni-MH or similar, not specified) |
| Charging Time | Approximately 90 minutes |
| Usage Time (Full Charge) | Up to 60 minutes |
| Blade Material | Titanium coated |
| Speed Settings | 2 (Sport and Normal) |
| Adjustable Combs | Long comb: 15-17-19-21-23-25 mm; Short comb: 3-5-7-9-11-13 mm |
| Cutting Length Adjustment | Button to slide comb |
| Precision Head | T-Blade for hair (removable) |
| Accessories Included | Precision head, 2 adjustable combs, cleaning brush, AC/DC power supply |
| Charging Indicator | LED: blinks red when charging low or fully charged |
| Warranty | 3 years |
| Water Resistance | Not waterproof; do not immerse in water |
| Cleaning | Use dry or damp cloth; clean blades with brush; lubricate before use |
| Safety Features | Automatic shut-off? Not specified; unplug after use |
| Compliance | EEE and WEEE directives |
Frequently Asked Questions - AR5504 Arzum
User questions about AR5504 Arzum
0 question about this device. Answer the ones you know or ask your own.
Ask a new question about this device
Download the instructions for your Beard trimmer in PDF format for free! Find your manual AR5504 - Arzum and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. AR5504 by Arzum.
USER MANUAL AR5504 Arzum
natural_image
Battery icon with charging symbol and clock, enclosed in a dotted circular border (no text or numbers)HIZLI ŞARJ

İKİ FARKLI
HIZ AYARI

TITANYUM
KAPLI BIÇAKLAR


AR 5504 DUCATI BY ARZUM S-CURVE SAÇ KESME MAKİNESİ

natural_image
Line drawing of a hand using a tool to adjust or install a mechanical component (no text or symbols visible)
natural_image
Illustration of a hand using a tool to lift a cylindrical object (no text or symbols visible)
SORUN GİDERME
Xiaxiang Tanjialing West Road, Lanjinag District,
Yuyao City, Zhejiang Province, Cn
İthalatçı:

natural_image
Illustration of a soldering iron with a coiled cable and labeled component (no text or symbols beyond label)
1- Socket for charging batteries and operation with mains power
2- Charge indicator LED
3- ON/OFF button
4- T- Blade for hair
5- Speed switch button (Sport and Normal)
6- Comb release button
7- Adjustable long comb (15-17-19-21-23-25 mm)
8- Adjustable short comb (3-5-7-9-11-13mm)
9- Cutting length setting button
10- Cleaner brush
11- AC/DC power supply unit with power cable
We thank you for having selected the Ducati by Arzum brand Hariclipper. This product as well is one of those we offer to you to make life easier for you. Designed and produced with customer satisfaction in focus.
Please read the instructions carefully to take a good output from the appliance and then save it for the future references.
IMPORTANT SAFEGUARDS
• Make sure that the voltage indicated on your appliance corresponds with the mains voltage in your home. Our company shall not be held liable for any failures owing to any discrepancy and such failures shall not be covered by the guarantee.
- Your device is for household use only. Do not use outdoors for commercial or industrial purposes. Otherwise, inconvenient uses shall not be covered by the guarantee.
- This appliance can be used by children aged from 8 years and above and persons with reduced physical, sensory or mental capabilities or lack of experience and knowledge if they have been given supervision or instruction concerning use of the appliance in a safe way and understand the hazards involved. Children shall not play with the appliance. Cleaning and user maintenance shall not be made by children
without supervision.
- Do not use extension cords that supply improper current in order to prevent damage to your machine.
- NEVER immerse your appliance in water or other liquid and NEVER use near containers containing water or other liquid. You can clean the outside of your appliance using a dry or moist cloth when not in use.
- Do not operate any appliance with a damaged cord or plug or after the appliance malfunctions or has been damaged in any manner, such as falling down, etc. Do not dismantle or repair yourself. Take the appliance to an Arzum Authorized Service.
- Use only original spare parts in your appliance.
- Do not use accessories of other appliances in your product. Use with only its own accessories.
- Do not use this appliance on animal fur or wigs and on hair made of synthetic material.
- Do not use your hair clipper without cleaning if it is used by others.
- NEVER touch the moving section of the appliance when it is on. Keep the appliance away from clothes, eyelashes and other objects.
- Switch the appliance off and make sure you unplug your appliance before all kinds of interventions on the appliance.
- Do not expose the appliance to temperatures below 0°C or over +45°C and especially to direct sunlight for a long time.
- Keep your hairclipper appliance and its accessories away from all kinds of heat sources.
- Do not use extension cords that supply improper current in order to prevent damage to your machine.
- Unplug your appliance after use, before attaching accessories and before cleaning and maintenance.
· Do not leave your appliance running when not in use and unplug it.
CHARGING THE APPLIANCE
- When the product is used for the first time, please fully charge the battery, and battery power should be completely emptied before it is charged for the second time, thereby extending the life of the battery.
- Charge the appliance for 4 hours until it is completely charged before starting to use it for the first time.
- If you do not charge the battery for a long time, it will malfunction that never charge again.
• Always make sure that the appliance is completely dry before using or charging. - Your battery has a product life as others. If you use your battery considering the charging rules, its usage life will be increase.
- When the lifetime of the battery has completed, the battery has to be changed only by an Arzum Authorized Service. Please charge and discharge the new battery according to the instructions mentioned before. Batteries of appliances which are not to be used according to be above mentioned instructions will complete its lifetime early.
- Charging takes approximately 90 minutes. The appliance can be used up to 60 minutes after it is charged.
- Switch the appliance off.
- Plug the power supply unit into a socket.
- Your appliance starts charging when charge indicator light. Charge indicator light will start blinking red in 1 second intervals when charge level is low or when battery is fully charged.
- Do not leave the appliance permanently connected to the mains power socket.
• Always switch the hairclipper off and unplug the plug from the charger socket after charging is complete.
To extend the lifespan of the hairclipper battery:
- Do not charge the battery every day. Preferably discharge the battery completely every six months and then charge for 1,5 hours.
- Do not charge the appliance for longer than the recommended charge time. Overcharging reduces the lifespan of rechargeable batteries.
- If the appliance is not to be used for a prolonged period of time, it must be charged for 1.5 hours before putting it away.
turns
CAUTION:
- Risk of corrosive substance EN leakage and explosion. Batteries shall NOT be disassembled, exposed to excessive heat such as that caused by sunlight, fire or similar sources. They shall NOT be short circuited, mechanically damaged, thrown into the fire, put into water, stored with metallic objects, dropped on hard surfaces. In case of battery leakage, avoid any contact with skin, eyes and clothing.
- Risk of serious lesions. Always keep the batteries out of reach of children. If swallowed, the batteries can cause lethal lesions. Therefore, alw keep the batteries out of reach of children. In the event that is swallowed, contact a doctor or the local poison centre immed
- Charge your appliance at room temperature. The appliance shall not be charged at the temperatures under the 0°C and over 45°C. The charging unit may heat during charging the appliance. It is normal while the battery is charging, the adapter may heat.
CONNECTING/DISCONNECTING THE ACCESSORIES
- To insert an accessory (4): Hold the appliance in one hand, position the desired head and push it down with force until you hear a "click".
- To remove an accessory (4): Press the central part of the head upwards using your thumb, then remove it from the appliance.


Assembly, disassembly and adjustment of combs (7 or 8):
- Slide the adjustable comb (7 or 8) onto the locking grooves on the appliance and push until it clicks into place. Make sure that the comb (7 or 8) is fastened securely in the locking grooves on both sides. To set the comb (7 or 8) to the required cutting length, push the adjustment button (9) and slide the comb into the required position.
• To remove the adjustable comb, press the release buttons on the sides of the appliance and slide the adjustable comb off the appliance.

USING YOUR APPLIANCE WARNING:
- Switch the appliance off before changing any accessories.
- DO NOT use this appliance if there are visible signs of damage. DO NOT use the appliance if the blades are damaged or do not work properly.
• Make sure that your or hair is dry and clean, with no residue of hairspray, mousse, gel or other hair products, and then brush in the direction of growth, untangling any knots. - Lubricate the blades of the appliance before each use. Clean the appliance blades using the brush provided and lubricate again.
Do not move the trimmer too fast if you are trimming your hair for the first time. Use the appliance with smooth movements.
- Position the precision head (4) on the appliance when it is off, making it slide onto the head Slide the comb (7 or 8) at the desired cutting height.
- Start with the adjustable comb set to the longest cutting length and reduce the cutting length in gradual steps.
- For the best results, use the appliance against the direction of hair growth.
- As not all hair grows in the same direction, use the appliance upwards, downwards or sideways as needed.
-
If an excessive amount of hair builds up in the teeth of the adjustable comb, remove the comb from the appliance and remove the accumulated hair from the comb with the cleaning brush.
-
If required, the appliance may be used without the adjustable comb to cut hair very closely to the skin (1 mm) or to trim at the nape of the neck and around the ears.
- Note the cutting length setting used.
Speed Switch Button (5)
Our device has two speed settings. Push the button up (sport mode) for a quick cut or for cutting very thick hair. Push the button down (normal mode) for cutting thinner hair.
CLEANING AND CARE
• Always disconnect the appliance from the socket before. You can clean the exterior by wiping with a dry or damp cloth.
- Do not use powdered products, abrasive liquid products or solvents such as alcohol or petroleum-based products to clean the appliance.
- NEVER plunge your appliance into water or another liquid. Clean also the main body of your appliance with a dried cloth.
Cleaning Blade Head
- Switch the appliance off and disconnect the power supply unit plug
• To remove the adjustable comb (7 or 8), press the release buttons on the sides of the appliance (6) and slide the adjustable comb off the appliance - Do not drop the blade head.
- Clean the blade head and the interior of the appliance with the brush provided.
- Insert the lock tab of the blade head in the slot on the appliance and push the head until it clicks into place.


natural_image
Line drawing of a hand using a tool to apply material into a mechanical component (no text or symbols)
natural_image
Illustration of a hand using a tool to lift a guitar into a button (no text or symbols visible)
TROUBLESHOOTING
| PROBLEM CAUSE SOLUTION | ||
| The blades do not move Blades | not lubricated correctly | Clean with the brush and lubricate with the oil |
| Blades become hot Blades not | ubricated correctly | Clean with the brush and lubricate with the oil |
Product life 7 years
TECHNICAL SPECIFICATIONS
INPUT: 100-240 V \~ 50/60 Hz 0.2 A
OUTPUT: 5.0 V ____1000 mA
HANDLING AND SHIPMENT
- During handling and shipment, your appliance must be kept in original package in order to prevent damages to its parts.
- Keep at normal position during shipment.
- Do not drop the product when transporting and protect from impacts.
• After delivery of the product, failures and damages that may occur while transporting are not covered by warranty.
The product is in compliance with the EEE Directives.
WEEE
This product contains recyclable materials that compliance with the WEEE directives. Do not dispose this product as unsorted municipal waste. Please contact your local municipality for the nearest collection point.


Manufacturer:
Ningbo Bangshou Electric Co., Ltd.
Xiaxiang Tanjialing West Road, Lanjinag District,
Yuyao City, Zhejiang Province, Cn
Importer:
natural_image
Line drawing of a hand using a tool to brush or mark on a mechanical component (no text or symbols)
natural_image
Illustration of a hand using a wrench to lift a cylindrical object (no text or symbols visible)
Xiaxiang Tanjialing West Road, Lanjinag District,
Yuyao City, Zhejiang Province, Cn
Importeur: