Product Type Portable Scaffold
Brand Vevor
Model WBS-020
Maximum Load 400 lb (approx. 181 kg)
Adjustable Height 50 to 74 cm (19.7 to 29.1 inches)
Platform Size 100 x 29 cm (39.4 x 11.4 inches)
Foldable Yes
Series 3
Color Silver Gray
Material Steel
Usage Indoor and Outdoor
Safety Check pins and cables before use
Maintenance Dry after use to prevent rust
Storage Store in a dry place, away from moisture
Warranty Technical support and electronic warranty certificate at www.vevor.com/support

Frequently Asked Questions - WBS-020 Vevor

How to assemble the Vevor WBS-020 scaffold?
Open the folded scaffold, secure the two side pins, lock the pins into the ends of the support tube, tighten one end of the metal cable with a screw, then adjust the height and fix with bolts and wing nuts.
What is the maximum load of the WBS-020 scaffold?
The maximum load is 400 lb (approx. 181 kg). Never exceed this limit.
Is the scaffold foldable?
Yes, the WBS-020 model is foldable for easy storage.
How to clean and maintain the scaffold?
After use, dry it thoroughly to prevent rust. Clean with a damp cloth and mild detergent. Do not use abrasive products.
What safety precautions should be taken?
Before each use, check the general condition: threads, welds, play in parts. Make sure the pins and metal cable are securely fastened. Do not exceed the maximum height.
How to adjust the height of the scaffold?
The height is adjustable from 50 to 74 cm. Loosen the wing nuts, adjust to the desired height, then retighten the nuts aligning the holes.
Can the scaffold be used outdoors?
Yes, it is suitable for outdoor use, but store it away from rain and moisture to extend its lifespan.
Where to find spare parts?
Contact customer service at www.vevor.com/support to obtain spare parts.
Is the scaffold delivered assembled?
No, it requires simple assembly according to the manual steps.
What is the warranty of the product?
Vevor offers technical support and an electronic warranty certificate. Visit www.vevor.com/support for more details.

User questions about WBS-020 Vevor

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

Your email remains private: it is only used to notify you if someone answers your question.

No questions yet. Be the first to ask one.

Download the instructions for your Scaffolding in PDF format for free! Find your manual WBS-020 - Vevor and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. WBS-020 by Vevor.

USER MANUAL WBS-020 Vevor

PORTABLE SCAFFOLDING

MODEL: WBS-020/WBS-021/WBS-022/WBS-023

We continue to be committed to provide you with tools at competitive prices. "Save Half", "Half Price" or any other similar expressions used by us only represent an estimate of savings you might benefit from buying certain tools with us compared to the major top brands and do not necessarily mean to cover all categories of tools offered by us. You are kindly reminded to verify carefully when placing an order with us if you are actually saving half in comparison with the top major brands.

VEVOR®

PORTABLE SCAFFOLDING

MODEL: WBS-020/WBS-021/WBS-022/WBS-023

Technical line drawing of two mechanical supports or structural frames, one with a handle and the other with a slatted base (no text or symbols).

NEED HELP? CONTACT US!

Have product questions? Need technical support? Please feel free to contact us:

This is the original instruction. Please read all manual instructions carefully before operating. VEVOR reserves a clear interpretation of the user manual. The appearance of the product shall be subject to the product you received. Please forgive us that we won't inform you if there are any technology or software updates on our product.

Vevor WBS-020 - NEED HELP? CONTACT US! - 1

Warning - To reduce the risk of injury, the user must read the manual carefully.

SECURITY & WARNINGS

  1. Do not exceed the scope of the work platform.
  2. After use, please dry before storage to avoid product rusting.
  3. Procedures not specifically explained in this manual must be performed only by a qualified technician.
  4. Before use, make sure that the pins on both sides of the fold and of the diagonal support rod are inserted into the holes.
  5. Make sure the wire rope is already tightened.
  6. To prevent serious injury from tool failure, do not use it when it is damaged:

1) Please check the overall condition of the product before each use.

• Is the screw thread damaged? • Is the weld cracked? - Are there gaps in all parts?

Before each use, check that the workbench is working properly before actually using it. If the workbench does not work properly, follow the inspection instructions to see if there is a problem.

In order to prevent serious damage, the failure of the work platform should be carefully overhauled, and all problems should be solved before use. If the solution provided in the troubleshooting guide does not solve the problem, check the workbench with a qualified technician before using it.

3) Make sure the working platform is safe enough to continue using.

SAVE THESE INSTRUCTIONS

PARAMETER LIST

ModelWBS-020WBS-021WBS-022WBS-023
Max.Load400lbs800lbs882lbs882lbs
Height19.7"-29.1"50-74cm27.6"-45.3"70-115cm31.5"-51.2"80-130cm35.4"-59"90-150cm
Platform Size39.4"X11.4"100X29cm55.1"X15"140X38cm63"X15"160X38cm71"X15"180X38cm
Foldable
Series3444
ColorSilver GraySilver GraySilver GraySilver Gray

ASSEMBLY STEPS

1.Open the folded scaffolding.
Vevor WBS-020 - SAVE THESE INSTRUCTIONS - 1Vevor WBS-020 - SAVE THESE INSTRUCTIONS - 2
Vevor WBS-020 - SAVE THESE INSTRUCTIONS - 3
  1. Secure both side pins securely and can not be easily pulled out.

Pin is inserted.

  1. Lock the pins on both ends of the support tube to ensure pins are stuck inside and can not be easily pulled out.

Pin is inserted.

  1. Tighten one end of wire rope with screw.

Ensure: Rope is tightened. Ensure: Pin is inserted. Adjust the tensioner.

  1. After adjusting the product to your desired height, secure the product with bolts through the concentric holes while locking the butterfly wing screw.

Technical diagram showing mechanical assembly with bolted components and directional arrows indicating movement or force.

INSTRUCTIONS

Use the Portable Scaffolding picture.

Person pushing a metal ladder on a wheeled cart (no text or symbols visible).

Worker in safety gear climbing a metal ladder inside a modern office hallway (no visible text or symbols).

Person installing a white curtain on a metal ladder in a room with potted plants and a window (no text or symbols visible).

Manufacturer: Shanghaimuxinmuyeyouxiangongsi

Address: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.

Imported to AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australia

Imported to USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730

UKREP

YH CONSULTING LIMITED.

C/O YH Consulting Limited Office 147,

Centurion House, London Road,

Staines-upon-Thames, Surrey, TW18 4AX

ECREP

E-CrossStu GmbH

Mainzer Landstr.69,

60329 Frankfurt am Main.

VEVOR®

TOUGH TOOLS, HALF PRICE

Technical Support and E-Warranty Certificate

www.vevor.com/support

VEVOR®

TOUGH TOOLS, HALF PRICE

NEED HELP? CONTACT US!

Technical line drawing of a mechanical frame assembly with rotational arrows indicating motion (no text or symbols).

3D technical illustration of a mechanical support system with vertical supports and horizontal beams (no text or symbols).

Person using a metal ladder on a wheeled platform (no text or symbols visible).

Worker on a metal ladder inspecting ceiling fixtures in a well-lit office hallway (no visible text or symbols)

Person installing a white curtain on a metal ladder in a room with potted plants and a window (no text or symbols visible)

Manufacturer: Shanghaimuxinmuyeyouxiangongsi

Address: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, Shanghai 200000 CN.

Imported into Australia: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australia

A/S YH Consulting Limited Office 147,

Centurion House, London Road,

Staines-upon-Thames, Surrey, TW18 4AX

REPRÉSENTANTDE LA CE

E-CrossStu GmbH

Mainzer Landstr.69,

www.vevor.com/support

PORTABLE SCAFFOLDS

MODEL: WBS-020/WBS-021/WBS-022/WBS-023

Technical diagram showing mechanical assembly with bolted components and directional arrows indicating movement or force

INSTRUCTIONS

Worker on a metal ladder inspecting ceiling fixtures in a well-lit office hallway (no visible text or symbols)

Person installing a white curtain on a metal ladder in a room with potted plants and a window (no text or symbols visible)

Manufacturer: Shanghai Muxin Wood Industry Co., Ltd.

Address: Room 1602A-1609, No. 11, Lane 803, Shuangcheng Road, Baoshan District, Shanghai 200000, China.

Imported into Australia by: SIHAO PTY LTD. 1 ROKEVA STREET, EASTWOOD NSW 2122, Australia

Imported into the USA by: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730

UKREP

YH CONSULTING LIMITED.

C/O YH Consulting Limited, Office 147,

Centurion House, London Road,

Staines-upon-Thames, Surrey, TW18 4AX

Vevor WBS-020 - INSTRUCTIONS - 3

www.vevor.com/support

VEVOR®

TOUGH TOOLS, HALF PRICE

Electronics www.vevor.com/support

PORTABLE NAIL GUNS

MODEL: WBS-020/WBS-021/WBS-022/WBS-023

Technical diagram showing mechanical assembly with bolted components and directional arrows indicating movement or force

INSTRUCTIONS

Worker on a metal ladder inspecting ceiling fixtures in a well-lit office hallway (no visible text or symbols)

Person installing a white curtain on a metal ladder in a room with potted plants and a window (no text or symbols visible)

Imported into Australia: SIHAO PTY LTD. 1 ROKEVA STREET, EASTWOOD

New South Wales 2122 Australia

C/O YH Consulting Limited Office 147,

Centurion House, London Road,

Staines-upon-Thames, Surrey, TW18 4AX

Vevor WBS-020 - INSTRUCTIONS - 3

electronics www.vevor.com/support

VEVOR®

TOUGH TOOLS, HALF PRICE

Technical line drawing of a metal ladder structure with support legs and a pull-up force arrow (no text or symbols)

INSTRUCTIONS

Worker on a metal ladder inspecting ceiling fixtures in a well-lit office hallway (no visible text or symbols)

Person installing a white curtain on a metal ladder in a room with potted plants and a window (no text or symbols visible)

Manufacturer: Shanghaimuxinmuyeyouxiangongsi

Address: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.

Imported into Australia: SIHAO PTY LTD. 1 ROKEVA STREET, EASTWOOD

Centurion House, London Road,

Staines-upon-Thames, Surrey, TW18 4AX

REPRESENTANTE CE

E-CrossStu GmbH

Mainzer Landstr.69,

NEED HELP? CONTACT US!

Technical line drawing of a mechanical frame assembly with rotational arrows indicating motion (no text or symbols)

3D technical illustration of a mechanical support frame with vertical supports and diagonal bracing (no text or symbols)

Person using a metal ladder on a wheeled platform (no visible text or symbols)

Worker on a metal ladder installing ceiling fixtures in a well-lit office hallway (no visible text or symbols)

Person installing a white curtain on a metal ladder in a room with potted plants and a window (no text or symbols visible)

Manufacturer: Shanghaimuxinmuyeyouxiangongsi

Address: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, Shanghai 200000 CN.

Imported to AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australia

C/O YH Consulting Limited Office 147,

Centurion House, London Road,

Staines-upon-Thames, Surrey, TW18 4AX

Przedstaw ciel UE

E-CrossStu GmbH

Mainzer Landstr.69,

60329 Frankfurt am Main.

VEVOR®

TOUGH TOOLS, HALF PRICE

NEED HELP? CONTACT US!

Technical line drawing of a mechanical frame assembly with rotational arrows indicating motion (no text or symbols)

3D technical illustration of a mechanical support frame with vertical supports and diagonal bracing (no text or symbols)

Technical diagram showing mechanical assembly with bolted components and directional arrows indicating movement or force

INSTRUCTIONS

Worker on a metal ladder inspecting ceiling fixtures in a well-lit office hallway (no visible text or symbols)

Person installing a white curtain on a metal ladder in a room with potted plants and a window (no text or symbols visible)

Manufacturer: Shanghaimuxinmuyeyouxiangongsi

Address: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.

C/O YH Consulting Limited Office 147,

Centurion House, London Road,

Staines-upon-Thames, Surrey, TW18 4AX

EC-REP

E-CrossStu GmbH

Mainzer Landstr.69,

60329 Frankfurt am Main.

VEVOR®

TOUGH TOOLS, HALF PRICE

warranty certificate www.vevor.com/support

VEVOR®

TOUGH TOOLS, HALF PRICE

www.vevor.com/support

PORTABLE STANDS

MODEL: WBS-020/WBS-021/WBS-022/WBS-023

NEED HELP? CONTACT US!

Person using a metal ladder on a wheeled cart, no visible text or symbols

Worker on a metal ladder inspecting ceiling fixtures in a well-lit office hallway (no visible text or symbols)

Person installing a white curtain on a metal ladder in a room with potted plants and a window (no text or symbols visible)

Manufacturer: Shanghaimuxinmuyeyouxiangongsi

Address: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.

Imported to AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australia

Imported to USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730

UKREP

YH CONSULTING LIMITED.

C/O YH Consulting Limited Office 147,

Centurion House, London Road,

Staines-upon-Thames, Surrey, TW18 4AX

ECREP

E-CrossStu GmbH

Mainzer Landstr.69,

60329 Frankfurt am Main.

VEVOR®

TOUGH TOOLS, HALF PRICE

www.vevor.com/support

Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : Vevor

Model : WBS-020

Category : Scaffolding