WBS-021 - Scaffolding Vevor - Free user manual and instructions
Find the device manual for free WBS-021 Vevor in PDF.
| Product Type | Portable Scaffolding |
| Brand | Vevor |
| Model | WBS-021 |
| Maximum Load | 800 lb (363 kg) |
| Adjustable Height | 70 to 115 cm |
| Platform Size | 140 x 38 cm |
| Foldable | Yes |
| Number of Sections | 4 |
| Color | Silver Gray |
| Material | Steel |
| Locking System | Side pins and support tube pins |
| Tensioned Steel Cable | Yes, with adjustable tensioner |
| Usage | Indoor and outdoor (on stable ground) |
| Assembly | Manual, no special tools required |
| Maintenance | Dry after use to prevent rust |
| Safety | Check general condition before each use |
| Warranty | See website www.vevor.com/support |
Frequently Asked Questions - WBS-021 Vevor
User questions about WBS-021 Vevor
0 question about this device. Answer the ones you know or ask your own.
Ask a new question about this device
Download the instructions for your Scaffolding in PDF format for free! Find your manual WBS-021 - Vevor and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. WBS-021 by Vevor.
USER MANUAL WBS-021 Vevor
PORTABLE SCAFFOLDING
MODEL: WBS-020/WBS-021/WBS-022/WBS-023
We continue to be committed to providing you with tools at competitive prices. "Save Half", "Half Price", or any other similar expressions used by us only represent an estimate of savings you might benefit from buying certain tools with us compared to the major top brands, and do not necessarily mean to cover all categories of tools offered by us. You are kindly reminded to verify carefully when placing an order with us if you are actually saving half in comparison with the top major brands.
VEVOR®
PORTABLE SCAFFOLDING
MODEL: WBS-020/WBS-021/WBS-022/WBS-023

NEED HELP? CONTACT US!
Have product questions? Need technical support? Please feel free to contact us:
This is the original instruction. Please read all manual instructions carefully before operating. VEVOR reserves a clear interpretation of the user manual. The appearance of the product shall be subject to the product you received. Please forgive us that we won't inform you if there are any technology or software updates on our product.

Warning: To reduce the risk of injury, the user must read the manual carefully.
SECURITY & WARNINGS
- Do not exceed the scope of the work platform.
- After use, please dry before storage to avoid product rusting.
- Procedures not specifically explained in this manual must be performed only by a qualified technician.
- Before use, make sure that the pins on both sides of the fold and of the diagonal support rod are inserted into the holes.
- Make sure the wire rope is already tightened.
- To prevent serious injury from tool failure, do not use it when it is damaged:
1) Please check the overall condition of the product before each use.
• Is the screw thread damaged? • Is the weld cracked? - Are there gaps in all parts?
Before each use, check that the workbench is working properly before actually using it. If the workbench does not work properly, follow the inspection instructions to see if there is a problem.
In order to prevent serious damage, be careful when overhauling the work platform, and solve all problems before use. If the solution provided in the troubleshooting guide does not solve the problem, check the workbench with a qualified technician before using it.
3) Make sure the working platform is safe enough to continue using.
SAVE THESE INSTRUCTIONS
PARAMETER LIST
| Model | WBS-020 | WBS-021 | WBS-022 | WBS-023 |
| Max.Load | 400lbs | 800lbs | 882lbs | 882lbs |
| Height | 19.7"-29.1"50-74cm | 27.6"-45.3"70-115cm | 31.5"-51.2"80-130cm | 35.4"-59"90-150cm |
| Platform Size | 39.4"X11.4"100X29cm | 55.1"X15"140X38cm | 63"X15"160X38cm | 71"X15"180X38cm |
| Foldable | √ | √ | √ | √ |
| Series | 3 | 4 | 4 | 4 |
| Color | Silver Gray | Silver Gray | Silver Gray | Silver Gray |
ASSEMBLY STEPS
| 1.Open the folded scaffolding. | |
![]() | ![]() |
![]() | |
- Secure both side pins securely and can not be easily pulled out.

- Lock the pins on both ends of the support tube to ensure pins are stuck inside and can not be easily pulled out.

- Tighten one end of wire rope with screw.

- After adjusting the product to your desired height, secure the product with bolts through the concentric holes while locking the butterfly wing screw.

INSTRUCTIONS
Use the Portable Scaffolding picture.



Manufacturer: Shanghaimuxinmuyeyouxiangongsi
Address: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.
Imported to AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australia
Imported to USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730
| UK | REP |
YH CONSULTING LIMITED.
C/O YH Consulting Limited Office 147,
Centurion House, London Road,
Staines-upon-Thames, Surrey, TW18 4AX
| EC | REP |
E-CrossStu GmbH
Mainzer Landstr.69,
60329 Frankfurt am Main.
VEVOR®
TOUGH TOOLS, HALF PRICE
Technical Support and E-Warranty Certificate
www.vevor.com/support
VEVOR®
TOUGH TOOLS, HALF PRICE
NEED HELP? CONTACT US!





Manufacturer: Shanghaimuxinmuyeyouxiangongsi
Address: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, Shanghai 200000 CN.
Imported into Australia: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australia
A/S YH Consulting Limited Office 147,
Centurion House, London Road,
Staines-upon-Thames, Surrey, TW18 4AX
| REPRÉSENTANT | DE LA CE |
E-CrossStu GmbH
Mainzer Landstr.69,

INSTRUCTIONS


Manufacturer: Shanghaimuxinmuyeyouxiangongsi
Address: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, Shanghai 200000 CN.
Imported into AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australia
Imported into the USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730
| UK | REP |
YH CONSULTING LIMITED.
C/O YH Consulting Limited Office 147,
Centurion House, London Road,
Staines-upon-Thames, Surrey, TW18 4AX

www.vevor.com/support
VEVOR®
TOUGH TOOLS, HALF PRICE
electronics www.vevor.com/support
PORTABLE IMPACT WRENCHES
MODEL: WBS-020/WBS-021/WBS-022/WBS-023

INSTRUCTIONS


Imported into AUS: SIHAO PTY LTD. 1 ROKEVA STREET EASTWOOD
New South Wales 2122 Australia
C/O YH Consulting Limited Office 147,
Centurion House, London Road,
Staines-upon-Thames, Surrey, TW18 4AX

electronics www.vevor.com/support
VEVOR®
TOUGH TOOLS, HALF PRICE

INSTRUCTIONS


Manufacturer: Shanghaimuxinmuyeyouxiangongsi
Address: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.
Imported into Australia: SIHAO PTY LTD. 1 ROKEVA STREET EASTWOOD
Centurion House, London Road,
Staines-upon-Thames, Surrey, TW18 4AX
| REPRESENTANTE CE |
E-CrossStu GmbH
Mainzer Landstr.69,
NEED HELP? CONTACT US!





Manufacturer: Shanghaimuxinmuyeyouxiangongsi
Address: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, Shanghai 200000 CN.
Imported into AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australia
C/O YH Consulting Limited Office 147,
Centurion House, London Road,
Staines-upon-Thames, Surrey, TW18 4AX
| Przedstawiciel UE |
E-CrossStu GmbH
Mainzer Landstr.69,
60329 Frankfurt am Main.
VEVOR®
TOUGH TOOLS, HALF PRICE
NEED HELP? CONTACT US!

INSTRUCTIONS


Manufacturer: Shanghaimuxinmuyeyouxiangongsi
Address: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.
C/O YH Consulting Limited Office 147,
Centurion House, London Road,
Staines-upon-Thames, Surrey, TW18 4AX

E-CrossStu GmbH
Mainzer Landstr.69,
60329 Frankfurt am Main.
VEVOR®
TOUGH TOOLS, HALF PRICE
warranty certificate www.vevor.com/support
VEVOR®
TOUGH TOOLS, HALF PRICE
www.vevor.com/support
BARBARA STANDS
MODEL: WBS-020/WBS-021/WBS-022/WBS-023
NEED HELP? CONTACT US!



Manufacturer: Shanghai Muxin Muye Youxiangongsi
Address: Shuangchenglu 803nong11hao1602A-1609shi, Baoshanqu, Shanghai 200000 CN.
Imported to AUS: SIHAO PTY LTD. 1 ROKEVA STREET EASTWOOD NSW 2122 Australia
Imported to USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730
| UK | REP |
YH CONSULTING LIMITED.
C/O YH Consulting Limited Office 147,
Centurion House, London Road,
Staines-upon-Thames, Surrey, TW18 4AX
| EC | REP |
E-CrossStu GmbH
Mainzer Landstr.69,
60329 Frankfurt am Main.
VEVOR®
TOUGH TOOLS, HALF PRICE
www.vevor.com/support


