BB-BGGJ02 - Kitchen accessory Vevor - Free user manual and instructions

Find the device manual for free BB-BGGJ02 Vevor in PDF.

Vevor BB-BGGJ02 - Kitchen accessory
📄 112 pages English EN Download 💬 AI Question 10 questions ⚙️ Specs
Notice Vevor BB-BGGJ02 - page 1
Pick your language and provide your email: we'll send you a specifically translated version.
Product TypeSuspended Pot Rack
BrandVevor
ModelBB-BGGJ02
Dimensions (L x D x H)762 x 356 x 584 mm
Maximum Load Capacity25 kg (55 lb)
Main MaterialIron (Metal)
Installation TypeWall Mount (Wood or Masonry Wall)
Number of Hooks Included12
Included ComponentsFrames, iron bars, M4*8 screws, M4*16 screws, M4*30 screws, plastic anchors, positioning card, hooks
Necessary Tools (Not Included)Drill, pencil
Installation Modes2 modes (depending on wall type)
Recommended UseSuspended storage of pots and pans
MaintenanceWipe with a damp cloth or glass cleaner
Safety PrecautionsDo not exceed load, keep out of reach of children, check fasteners regularly
Technical Supportwww.vevor.com/support
WarrantyElectronic warranty certificate available online

Frequently Asked Questions - BB-BGGJ02 Vevor

How to install the Vevor BB-BGGJ02 Pot Rack?
Follow the assembly instructions provided. Two installation modes are available depending on your wall type. Use the positioning card to drill holes, insert the plastic anchors, then fix the rack with the provided screws. Make sure to tighten all screws.
What is the maximum load capacity?
The maximum capacity is 55 lb (approximately 25 kg). Never exceed this load to avoid risk of falling.
Can this rack be installed on a drywall wall?
The manual indicates installation on wood wall or masonry wall (concrete, brick). For drywall, it is necessary to use suitable anchors not provided. Check the wall's solidity.
How to clean this pot rack?
Wipe the surface with a damp cloth (not wet) or a lint-free dry cloth. You can also use a glass cleaner or similar product.
What to do if parts are missing or damaged?
Contact technical support at www.vevor.com/support. The electronic warranty certificate is available online.
Is this product a toy?
No, it is not a toy. Do not let children play with or near it. Use it only for storing pots.
What tools are needed for assembly?
You will need a drill and a pencil. Screws and anchors are provided.
Can I use this rack on a shelf or table?
No, the rack is designed for wall installation only. Do not use it alone on the floor or on a desk.
How many hooks are included?
12 hooks are included with the rack.
How to check that the installation is secure?
Before applying load, tighten all knobs firmly and check that all screws are properly inserted. Regularly inspect the condition of the fasteners.

User questions about BB-BGGJ02 Vevor

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

Your email remains private: it is only used to notify you if someone answers your question.

No questions yet. Be the first to ask one.

Download the instructions for your Kitchen accessory in PDF format for free! Find your manual BB-BGGJ02 - Vevor and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. BB-BGGJ02 by Vevor.

USER MANUAL BB-BGGJ02 Vevor

Technical Support and E-Warranty Certificate www.vevor.com/support

HANGING POT RACK

USER MANUAL

BB-BGGJ02

We continue to be committed to provide you tools with competitive price. "Save Half", "Half Price" or any other similar expressions used by us only represents an estimate of savings you might benefit from buying certain tools with us compared to the major top brands and does not necessarily mean to cover all categories of tools offered by us. You are kindly reminded to verify carefully when you are placing an order with us if you are actually saving half in comparison with the top major brands.

VEVOR®

TOUGH TOOLS, HALF PRICE

Hanging Pot Rack

Thanks for purchasing one of our products. Please read carefully the assembly instructions before installation.

Line drawing of a two-tiered metal shelving unit (no text or symbols)

Line drawing of two stacked metal shelving units with grid patterns (no text or symbols)

Model: BB-BGGJ01

NEED HELP? CONTACT US!

Have product questions? Need technical support? Please feel free to contact us:

Technical Support and E-Warranty Certificate

www.vevor.com/support

This is the original instruction. Please read all manual instructions carefully before operating. VEVOR reserves a clear interpretation of the user manual. The appearance of the product shall be subject to the product you received. Please forgive us that we won't inform you again if there are any technology or software updates on our product.

PRODUCT PARAMETERS

Model ProductSize (W*D*H)Loading Capacity
BB-BGGJ0230 x14x23 in(762x356x584mm) 55 lb (Max)

WARNING:

Keep this manual for the safety warnings and precautions. The manual offers important information on how to assemble, use and maintain this product. Failure to do so can result in serious injury.

ASSEMBLY PRECAUTIONS

  1. Assembly needs to follow these instructions. Incorrect assembly can create a hazard.
  2. Please handle metal edges carefully. Wear safety goggles and heavy-duty work gloves during assembly.
  3. Do not assemble when tired or under the influence of alcohol, drugs, or medication.
  4. Weight capacity and other product capabilities apply to a properly and completely assembled product only.
  5. Keep the assembly area clean and well-lit.
  6. Keep bystanders out of the area during assembly.
  7. When installing, select a suitable and reliable wall installation, and choose the correct fastening parts to use.

USE PRECAUTIONS

Vevor BB-BGGJ02 - USE PRECAUTIONS - 1

WARNING: TO PREVENT SERIOUS INJURY AND DEATH FROM

TIPPING:

  1. This product is not a toy. Do not allow children to play with or near this item.
  2. Use as intended only. Do not sit or stand on the product.
  3. Inspect before every use. Do not use it if parts are loose or damaged.
  4. Products are installed on wooden walls or reinforced walls; Do not use it alone on the ground or on the desktop.
  5. Do not exceed the listed weight capacity. Tighten all knobs securely before applying load. Be aware of dynamic loading! The sudden load movement may briefly create an excess load, causing product failure.

SAVE THESE INSTRUCTIONS

PARTS LIST

No. A BC D E
NameBase Frame Iron bar M4*8 ST4*16For wooden
PartsVevor BB-BGGJ02 - PARTS LIST - 1Vevor BB-BGGJ02 - PARTS LIST - 2Vevor BB-BGGJ02 - PARTS LIST - 3Vevor BB-BGGJ02 - PARTS LIST - 4Vevor BB-BGGJ02 - PARTS LIST - 5
Quantiy2 PCS2 PCS2PCS8 PCS8 PCS
No.FGHI
NameM4*30(For wall)Plastic plug(For wall)positioning cardHook
PartsVevor BB-BGGJ02 - PARTS LIST - 6Vevor BB-BGGJ02 - PARTS LIST - 7Vevor BB-BGGJ02 - PARTS LIST - 8Vevor BB-BGGJ02 - PARTS LIST - 9
Quantiy8 PCS8 PCS1 PCS12PCS

ASSEMBLY STEPS

Installation Mode 1

STEP 1

  1. Put the positioning card (H) on the wall and punch holes, then put the plastic plugs (G) into the holes.

G

(If installing on wooden material, mark the punch position with a pencil.)

Line drawing of a hand holding a rectangular object with a pencil, against a brick wall background (no text or symbols)

STEP 2

  1. Assemble the frames (B) and iron bars (C) with M4*8 screws (D) onto the base (A).

A B C D

STEP 3

Punch the M4*30 screws (F) half into the wall.

F

STEP 4

  1. Hang the product on the wall and secure it with screws on the right side.

Technical diagram of a filtration system with two circular insets showing internal components (no text or labels)

COMPLETION

ION F

  1. Fix the product on the wall with M4*30 screws (F) and finish the installation.

Tips: If installing on a wooden wall, you only need to use M4*16 screws for steps 3, 4, and 5, and no plastic plugs are required.

Installation Mode 2

STEP 1

  1. Place the positioning card (H) on the wall and punch holes, then insert the plastic plugs (G) into the holes.

G

(If installing on wooden material, mark the punch positions with a pencil.)

Simple line drawing of a hand pointing at a blank rectangular board with a pencil, against a brick wall background (no text or symbols)

STEP 2

  1. Assemble the frames (B) onto the base (A) using M4*8 screws (D).

B A D

STEP 3

Drive the M4*16 screws (E) halfway into the wall.

E

STEP 4: Hanging the product on the wall and stuck with screws at right side.

STEP 5: Fix the product on the wall with M4*16 screws (E) and finish the installation. E I

Cleaning

- For cleaning, wipe the surface with a damp (not wet) cloth or a clean, lint-free cotton cloth.

Window cleaning liquid or a similar cleaning liquid can be used to clean the surface.

Manufacturer: Shanghai Muxin Wood Industry Co., Ltd.

Address: Room 1602A-1609, No. 11, Lane 803, Shuangcheng Road, Baoshan District, Shanghai 200000, China.

Imported to Australia: SIHAO PTY LTD. 1 Rokeva Street, Eastwood NSW 2122, Australia.

Imported to USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730.

REPU

YH CONSULTING LIMITED.

K/O YH Consulting Limited, Office 147, Centurion

House, London Road, Staines-upon-Thames,

Surrey, TW18 4AX.

REPE

E-CrossStu GmbH

Mainzer Landstr. 69, 60329

Frankfurt am Main.

VEVOR®

TOUGH TOOLS, HALF PRICE

Technical Support and E-Warranty Certificate

www.vevor.com/support

VEVOR®

TOUGH TOOLS, HALF PRICE

Technical line drawing of two stacked metal shelving units with grid patterns (no text or symbols)

Model: BB-BGGJ01

NEED HELP? CONTACT US!

www.vevor.com/support

PRODUCT PARAMETERS

STEP 2

COMPLETIONTechnical diagram of a roof structure with grid panels and an inset showing detailed cross-section (no text or symbols)

STEP 2

Cleaning

A/S YH Consulting Limited Office 147, Centurion House, London Road, Staines-upon-Thames, Surrey, TW18 4AX

CE REPRESENTATIVE

E-CrossStu GmbH

Mainzer Landstr.69, 60329

Technical line drawing of two stacked metal shelving units with grid patterns (no text or symbols)

Model: BB-BGGJ01

STEP 2

COMPLETION

Technical diagram of a multi-level structure with grid patterns and an inset showing a magnified detail (no text or symbols)

STEP 2

STEP 5

Cleaning

C/O YH Consulting Limited Office 147, Centurion House, London Road, Staines-upon-Thames, Surrey, TW18 4AX

Vevor BB-BGGJ02 - Cleaning - 1

www.vevor.com/support

VEVOR®

TOUGH TOOLS, HALF PRICE

Technical line drawing of two stacked metal shelving units with grating patterns (no text or symbols).

Model: BB-BGGJ01

www.vevor.com/support

STEP 2

COMPLETION

F ENTO

STEP 2

Cleaning

Imported into AUS: SIHAO PTY LTD. 1 ROKEVA STREET EASTWOOD NSW 2122 Australia

Imported into USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730

RAPPRESENTANZA DEL REGNO UNITO

YH CONSULTING LIMITED.

C/O YH Consulting Limited Office 147, Centurion House, London Road, Staines-upon-Thames, Surrey, TW18 4AX

3D wireframe diagram of a two-tiered storage tray or rack structure (no text or symbols).

Technical line drawing of two stacked metal shelving units with grid patterns (no text or symbols).

Model: BB-BGGJ01

www.vevor.com/support

STEP 2

FINISHINGTechnical diagram of a roof structure with labeled components and cross-sectional view.

STEP 2

Cleaning

C/O YH Consulting Limited Office 147, Centurion House, London Road, Staines-upon-Thames, Surrey, TW18 4AX

REPRESENTANTE CE

E-CrossStu GmbH

Mainzer Landstr.69, 60329

Frankfurt am Main.

VEVOR®

TOUGH TOOLS, HALF PRICE

Technical line drawing of two stacked metal shelving units with grid patterns (no text or symbols)

Model: BB-BGGJ01

NEED HELP? CONTACT US!

www.vevor.com/support

STEP 2

COMPLETION

Technical diagram of a roof structure with grid panels and an inset showing detailed cross-section (no text or symbols)

STEP 2

STEP 5

Cleaning

C/O YH Consulting Limited Office 147, Centurion House,

London Road, Staines-upon-Thames, Surrey, TW18

4AX

Przedstaw ciel UE

E-CrossStu GmbH

Mainzer Landstr.69, 60329

Frankfurt am Main.

VEVOR®

TOUGH TOOLS, HALF PRICE

Technical line drawing of two stacked metal shelving units with grid patterns (no text or symbols)

Model: BB-BGGJ01

NEED HELP? CONTACT US!

STEP 2

COMPLETION

Technical diagram of a multi-tiered structural framework with grid patterns and an inset magnified view (no text or symbols)

STEP 2

Cleaning

C/O YH Consulting Limited Office 147, Centurion

House, London Road, Staines-upon-Thames, Surrey,

TW18 4AX

EC-REP

E-CrossStu GmbH

Mainzer Landstr.69, 60329

Frankfurt am Main.

VEVOR®

TOUGH TOOLS, HALF PRICE

Warranty certificate www.vevor.com/support

VEVOR®

TOUGH TOOLS, HALF PRICE

Technical line drawing of two stacked metal shelving units with grid patterns (no text or symbols)

Model: BB-BGGJ01

NEED HELP? CONTACT US!

STEP 2

ASSEMBLYF LIND

STEP 2

  1. Attach the frames (B) with M4*8 screws (D) to the base (A).

B A D

STEP 3

STEP 5

Cleaning

C/O YH Consulting Limited Office 147, Centurion House, London Road, Staines-upon-Thames, Surrey, TW18 4AX

ECREP

E-CrossStu GmbH

Mainzer Landstr. 69, 60329

Frankfurt am Main.

VEVOR®

TOUGH TOOLS, HALF PRICE

www.vevor.com/support

Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : Vevor

Model : BB-BGGJ02

Category : Kitchen accessory