Archer T600U Plus - Network card / adapter TP-LINK - Free user manual and instructions

Find the device manual for free Archer T600U Plus TP-LINK in PDF.

TP-LINK Archer T600U Plus - Network card / adapter
📄 30 pages English EN Download 💬 AI Question 10 questions ⚙️ Specs
Notice TP-LINK Archer T600U Plus - page 3
Pick your language and provide your email: we'll send you a specifically translated version.
Product Type Network card / adapter (USB Wi-Fi adapter)
Brand TP-Link
Model Archer T600U Plus
Wireless Standards IEEE 802.11a/b/g/n/ac
Frequency Band Dual-band 2.4 GHz & 5 GHz
Maximum Speed 600 Mbps (200 Mbps on 2.4 GHz + 433 Mbps on 5 GHz)
Interface USB 2.0 (backward compatible with USB 1.1)
Antenna Type 1 x external high-gain antenna
Dimensions (W x D x H) Approx. 9.3 x 2.6 x 1.4 cm
Weight Approx. 20 g
Power Supply USB bus powered (5 V DC)
Security WPA/WPA2-PSK, WEP (64/128-bit)
Operating System Support Windows, macOS, Linux
LED Indicator 1 x status LED (power/activity)
Operating Temperature 0°C to 40°C (32°F to 104°F)
Storage Temperature -40°C to 70°C (-40°F to 158°F)
Operating Humidity 10% to 90% non-condensing
Storage Humidity 5% to 90% non-condensing
Package Contents Archer T600U Plus, Quick Installation Guide, Resource CD
Warranty 2 years (may vary by region)
Certifications FCC, CE, RoHS
Maintenance & Cleaning Keep dry; clean with a soft, dry cloth; avoid liquids
Repairability Not user-serviceable; contact TP-Link support for issues

Frequently Asked Questions - Archer T600U Plus TP-LINK

How do I install the TP-Link Archer T600U Plus adapter?
Insert the adapter into an available USB port. For Windows, insert the Resource CD and install the driver. Alternatively, download the driver from TP-Link's support site and run the setup. Follow on-screen instructions.
Does the Archer T600U Plus support dual-band Wi-Fi?
Yes, it supports dual-band 2.4 GHz and 5 GHz, providing speeds up to 600 Mbps combined.
Which operating systems are compatible?
It works with Windows (XP/7/8/10/11), macOS (10.9 and later), and Linux (kernel 2.6.18 and above).
Can I use this adapter with a USB 3.0 port?
Yes, it is compatible but limited to USB 2.0 speeds (480 Mbps). For best performance, use a USB 2.0 port.
How do I know if the adapter is working?
The LED indicator should light up. If it blinks, it indicates activity. Check Device Manager (Windows) or System Report (macOS) for recognition.
What should I do if the adapter is not detected?
Unplug and replug the adapter. Reinstall the driver from the CD or website. Try a different USB port. Restart your computer.
Does this adapter support WPA3 security?
No, it supports WPA/WPA2-PSK and WEP. For networks with WPA3, set the router to WPA2 mixed mode.
Can I connect to a 5 GHz network only?
Yes, you can select the 5 GHz band in your network settings. The adapter will connect to available 5 GHz networks.
How do I clean the Archer T600U Plus?
Disconnect it from the computer. Use a soft, dry cloth to wipe the exterior. Do not use water, solvents, or abrasive cleaners.
Is the adapter repairable if broken?
No, it is not user-serviceable. If faulty, contact TP-Link support or refer to the warranty for replacement.

User questions about Archer T600U Plus TP-LINK

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

Your email remains private: it is only used to notify you if someone answers your question.

No questions yet. Be the first to ask one.

Download the instructions for your Network card / adapter in PDF format for free! Find your manual Archer T600U Plus - TP-LINK and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. Archer T600U Plus by TP-LINK.

USER MANUAL Archer T600U Plus TP-LINK

AC600 High Gain Wireless Dual Band USB Adapter Archer T2U Plus

Contents

About This Guide .... 1

Chapter 1. Get to Know About Your Adapter .... 2

1.1. Product Overview 3

1.2. LED Status 3

Chapter 2. Connect to a Computer .... 4

Chapter 3. Windows....6

3.1. Install Driver 7

3.2. Join a Wireless Network....8

3.3. Uninstall Driver....8

Chapter 4. Mac OS X....9

4.1. Install Driver and Utility.... 10

4.2. Join a Wireless Network.... 12

4.2.1. TP-Link Utility 12

4.2.2 WPS (Wi-Fi Protected Setup) 13

4.3 Management 16

4.4 Uninstall Driver and Utility 17

Appendix: Troubleshooting 19

About This Guide

This guide is a complement to the Quick Installation Guide. The Quick Installation Guide instructs you on quick installation, and this guide provides the product overview and detailed instructions for each step.

When using this guide, please note that features of the adapter may vary slightly depending on the model and software version you have. All screenshots, images, parameters, and descriptions documented in this guide are used for demonstration only.

Conventions

In this guide, the following conventions are used:

ConventionDescription
Teal ItalicHyperlinks are in teal italic. You can click to redirect to a website or a specific section.
TealContents to be emphasized and texts on the web page are in teal, including the menus, items, buttons, etc.
Note:Ignoring this type of note might result in a malfunction or damage to the device.
Tips:Indicates important information that helps you make better use of your device.

*Maximum wireless signal rates are the physical rates derived from IEEE Standard 802.11 specifications. Actual wireless data throughput and wireless coverage, and quantity of connected devices are not guaranteed and will vary as a result of network conditions, AP limitations, and environmental factors, including building materials, obstacles, volume and density of traffic, and AP location. *To ensure compatibility, you may need to update the adapter's drivers after an OS update. You can find our latest drivers in the download center at tp-link.com/en/download-center.

More Info

  • The latest software and utility can be found at https://www.tp-link.com/download-center.
  • The Quick Installation Guide (QIG) can be found where you find this guide or inside the package of the product.
  • Specifications can be found on the product page at https://www.tp-link.com.
  • Our Technical Support contact information can be found at the Contact Technical Support page at https://www.tp-link.com/support.

Chapter 1

Get to Know About Your Adapter

This chapter introduces what the adapter can do and shows its appearance. This chapter contains the following sections:

  • Product Overview
  • LED Status

1.1. Product Overview

TP-Link Wireless USB Adapter connects your computer to a Wi-Fi network for smooth HD video, voice streaming and online gaming.

  • 256QAM support increases the 2.4 GHz data rate from 150 Mbps to 200 Mbps, 200 Mbps on the 2.4 GHz band and 433 Mbps on the 5 GHz band, ensuring you fully enjoy fast AC Wi-Fi.
  • A 5dBi high-gain antenna greatly enhances the reception and transmission signal strength of the USB adapter.
  • Utilizes 802.11ac standard and is backward compatible with 802.11a/b/g/n. Supports 64/128 bit WEP, WPA-PSK/WPA2-PSK. Supports Windows and Mac.

1.2. LED Status

Black USB device with extended left-angle cable, isolated on white background (no text or symbols)

You can check the adapter's working status by following the LED Explanation table.

StatusIndication
OffThe driver is not installed.The adapter is not detected.
On The driver has been installed successfully.

Tips:

If the LED is off, try these troubleshooting tips:

  1. Check if the adapter is recognized and enabled or not. Refer to Troubleshooting-T2 for detailed instructions.
  2. Remove and reinsert the adapter.
  3. Reinstall the software, if necessary.

Chapter 2

Connect to a Computer

This chapter introduces how to connect the adapter to your computer.

Before you start using your adapter, insert the adapter into a USB port on your computer directly.

Close-up of a white laptop with a black wireless router attached, placed on a wooden table (no visible text or symbols)

* The image is for demonstration only.

After connecting your adapter to the computer, please follow the instructions in the appropriate chapter for your operating system: Windows, Mac OS X.

Chapter 3

Windows

This chapter introduces how to install your adapter's driver, use your adapter to join a wireless network, and uninstall your adapter in a Windows system. The adapter is equipped with a Setup Wizard, which can guide you through the installation process.

This chapter includes the following sections:

  • Install Driver
  • Join a Wireless Network
  • Uninstall Driver

3.1. Install Driver

  1. Insert the resource CD into your CD drive and run the Autorun.exe from the pop-up Autoplay window.

Note:

  1. You can also download the driver or check the new release at https://www.tp-link.com/download-center.
  2. In some operating systems, the CD screen will pop up automatically. Otherwise, run the CD manually.
  3. Select Archer T2U Plus and follow the instructions to complete the installation.

Note:

If you can't install the driver successfully, disable the antivirus software and firewall, then try again.

First, select your model to begin installing the driver. Archer T2U Plus. Copyright © 2018-2019 TP-Link Technologies Co., Ltd. All rights reserved.

  1. When the following screen appears, the driver has been installed successfully.

tp-link — Archer T2U Plus — Driver is installed! Now you can connect your computer to a Wi-Fi network. OK

3.2. Join a Wireless Network

You can join a wireless network via Windows built-in wireless utility. Follow the instructions below to use your computer system's built-in wireless utility:

  1. Click 📄, or (Network icon) on the taskbar. Select the Wi-Fi network you want to join, and click Connect. Enter the network password when prompted.
  2. When the network icon changes to 📄 or 📋 it indicates a successful network connection.

3.3. Uninstall Driver

The software uninstallation steps vary a bit from different systems. Please follow the appropriate instructions for your Windows operating system: Windows 8/8.1/10, Windows XP/7.

- Windows 8/8.1/10

Go to Start menu to find the TP-Link application. Click Uninstall TP-Link Archer T2U Plus Driver, then follow the on-screen instructions to complete the uninstallation.

- Windows XP/7

Go to Start > All Programs > TP-Link > Uninstall TP-Link Archer T2U Plus Driver. Follow the on-screen instructions to complete the uninstallation.

Chapter 4

Mac OS X

This chapter introduces how to install your adapter's driver and utility, use your adapter to join a wireless network, manage your adapter and uninstall your adapter in Mac OS X.

This chapter includes the following sections:

• Install Driver and Utility - Join a Wireless Network - Management - Uninstall Driver and Utility

4.1. Install Driver and Utility

We take the steps in Mac OS X 10.10 as an example - the steps may vary slightly for other versions of Mac OS.

  1. Download the driver and utility at https://www.tp-link.com/download-center.

Note:

The CD is included in the package. If your computer has a CD drive, you can also run the included CD to install the driver and utility.

  1. Double-click to unzip the downloaded folder and run the Install.pkg.

MacDriverSetup: MacDriverSetup, Install.pkg, Uninstall.command. 3 Items, 864.46 GB available

  1. The Install TP-Link Wireless USB Adapter Utility and Driver Wizard window will appear. Click Continue and follow the instructions to complete the installation.

Install TP-Link Wireless USB Adapter Utility and Driver. Welcome to the TP-Link Wireless USB Adapter Utility and Driver Installer. Welcome to TP-Link Wireless world.... Introduction, Read Me, License, Destination Select, Installation Type, Installation, Summary. Go Back, Continue

  1. When the following screen appears, the driver and utility have been installed successfully. Click Restart to finish the installation.

Install TP-Link Wireless USB Adapter Utility and Driver. The installation was completed successfully. Introduction, Read Me, License, Destination Select, Installation Type, Installation, Summary. The installation was successful. The software was installed. Click Restart to finish installing the soft…

  1. After restarting the computer, the TP-Link Utility icon will appear on the menu bar in the upper-right corner of the screen. To use the utility to join a Wi-Fi network with your adapter, refer to Join a Wireless Network.

Note:

If the TP-Link Utility icon does not appear on the menu bar, make sure the USB wireless network adapter is connected properly and its LED is on.

4.2. Join a Wireless Network

There are two options of using the adapter to join a Wi-Fi network.

Option 1: TP-Link Utility

TP-Link Utility lets you easily connect the adapter to a Wi-Fi network and manage the adapter.

Option 2: WPS (Wi-Fi Protected Setup)

WPS (Wi-Fi Protected Setup) is a network security standard for easily adding computers and other devices to a home network. Use this method if your wireless router or access point supports WPS.

Option 1

Click the TP-Link Utility icon on the menu bar, and choose a Wi-Fi network from the list. Enter the password when prompted.

When you are connected to the internet, the network icon will change.

USE - AMO One, Turn - USB-WT-Off, with Preferences. CMCC, CMCC-OPEN, CMSS-1003, GTR NO., MORE CUPY, 2004, TP-LINK, 2005, TP-LINK, 2006, TP-LINK, 2007, TP-LINK, 2008, TP-LINK, 2009, TP-LINK, 2010, TP-LINK, 2011, TP-LINK, 2012, TP-LINK, 2013, TP-LINK, 2014, TP-LINK, 2015, TP-LINK, 2016, TP-LINK, 2017,…

Option 2

  1. Click the TP-Link Utility icon on the menu bar, and then click Open Wireless Utility at the bottom of the network list.
  2. Select the network you want to join from the list and enter the password when prompted. Click Join.

Select the network you want to join. Select the network you want to join from the list, and then enter the network password if necessary. TP-LINK_0115, TP-LINK_0919, TP-LINK_50F2, TP-LINK_6H8UE, TP-LINK_748E. Security: WPA2_PSK AES. Password: ********. Show password. Join Other Profiles, Cancel, Joi…

Note:

If your Wi-Fi network is not displayed in the list, you can try to join it by WPS or by clicking Join Other on the above screen, and then follow the on-screen instructions to join the network.

4.2.2. WPS (Wi-Fi Protected Setup)

WPS can be activated via PBC (Push Button Configuration) and PIN code on the TP-Link Utility. Please refer to PBC or PIN below.

• PBC

  1. Press the WPS/QSS button on your router or AP.

WPS

  1. Within 2 minutes, click the TP-Link Utility icon on the menu bar, and then click WPS at the bottom of the network list.

USB: Alt+ On, Sun: USA-MSD-01, and Bookstore. CMCS, CMCS-FAX6, CMCS-WGS, GTR AG, MERCURY_0004, TP-LINK_0005, TP-LINK_0006, TP-LINK_0007, TP-LINK_0008, TP-LINK_0009, TP-LINK_0010, TP-LINK_0011, TP-LINK_0012, TP-LINK_0013, TP-LINK_0014, TP-LINK_0015, TP-LINK_0016, TP-LINK_0017, TP-LINK_0018, TP-LINK_0…

  1. Click PBC.

WPS. Please key the PIN code into your AP's config page. PIN: 82505707. PIN PBC, Cancel

  1. The following screen indicates a successful connection by WPS. Click OK.

WPS. WPS Protocol Finished !! It will connect to WPS AP automatically. OK. PIN PBC, Cancel

• PIN

  1. Click the TP-Link Utility icon on the menu bar, and then click WPS at the bottom of the network list.

USB: 001-01, Turn: USB-NOV-01, and Bookstore. COMC, COMC-FACE, COMC-WBS, GTR AG, MERCUM_0004, TP-LINK_0005, TP-LINK_0006, TP-LINK_0007, TP-LINK_0008, TP-LINK_0009, TP-LINK_0010, TP-LINK_0011, TP-LINK_0012, TP-LINK_0013, TP-LINK_0014, TP-LINK_0015, TP-LINK_0016, TP-LINK_0017, TP-LINK_0018, TP-LINK_00…

  1. Click PIN.

WPS. Please key the PIN code into your AP's config page. PIN: 82505707. PIN PBC, Cancel

  1. Within 2 minutes, log in to the web management page of your router or AP. Go to its WPS page, enter the PIN of the adapter in the corresponding field and click Connect.
  2. The following screen indicates a successful connection by WPS. Click OK.

WPS WPS Protocol Finished !! It will connect to WPS AP automatically. OK PIN PBC Cancel

4.3. Management

TP-Link Utility provides you with an easy way to manage various connection settings of your Wi-Fi network.

  1. Click the TP-Link Utility icon on the menu bar, and then click Open Wireless Networks.

TP-LINK Archer T600U Plus - Management - 1

on the menu bar, and then click Open Wireless list.

File Edit View Go Window Help USB Add On Turn-USB-MAT-Off and Release CMOS CMOS-FREE CMOS-HSS CTM-5G MDCUMY_0004 TP-UNK-0002 TP-UNK-0003 TP-UNK-0004 TP-UNK-0005 TP-UNK-0012 TP-UNK-0013 TP-UNK-0014 TP-UNK-0015 TP-UNK-0016 TP-UNK-0017 TP-UNK-0018 TP-UNK-0019 TP-UNK-0020 Jio Show Network RPS Open Wirel…

  1. TP-Link Utility will pop up. Click the Profiles button to open the Profiles screen.

Select the network you want to join. Select the network you want to join from the list, and then enter the network password if necessary. TP-LINK_0115 TP-LINK_0919 TP-LINK_50F2 TP-Link Network TP-Link_7B00 Join Other Profiles Cancel Join

  1. The Profiles screen lets you manage different Wi-Fi connection settings as profiles so that you can connect to your network easily.

Preferred Networks: State SSID Security TP-Link Network WPA2 Personal Network Name: TP-Link Network Security: WPA2_PSK AES Password: .......... Remove Cancel Apply

Preferred Networks displays the networks that you once connected to. The networks' status and information are displayed in the table.

• To join a Wi-Fi network

If you want to join a Wi-Fi network that is listed on the profile screen, select the profile and click Apply in the bottom right corner.

• To manage an existing profile

If you want to change the wireless settings of an existing profile, select it and then you can edit its Security and Password. If you want to delete a profile, select it and click Remove.

4. Uninstall Driver and Utility

  1. Double-click Uninstall.command in the downloaded folder.

MacDriverSetup MacDriverSetup Install.pkg Uninstall.command SHELL 3 items, 864.46 GB available

  1. Enter the password of your computer and when the "Uninstall Complete" message appears, the uninstallation is complete.

Last login: Wed Aug 23 14:13:49 on console ElliedeiMAC:~ shixiaoyun$ /Users/shixiaoyun/Desktop/Mac\ OS\ X\ P_10.12/Uninstall.command ; exit; Please type the password of "root" to Uninstall Phase1: Terminate Utility [Password: Phase2: System Information Phase3: Remove Utility Related Phase4: Remove I…

Appendix: Troubleshooting

T1. What should I do if the adapter is not detected?

  • Make sure the adapter is securely connected to the computer.
  • Make sure you meet the minimum system requirements for the adapter and that the latest Windows and system updates are installed on your computer.
  • Make sure you use the latest driver for your specific adapter. The latest drivers can be found at the product's Support page at https://www.tp-link.com/download-center.
  • Try a different USB port on the computer.
  • Try restarting the computer or try using the adapter on a different computer.

T2. How to check if I have installed the driver for my adapter successfully or not?

  1. On your computer, right-click the Computer icon and select Manage.

This PC Open Manage Pin to Start Map network drive... Disconnect network drive... Create shortcut Delete Rename Properties

  1. Open Device Manager, go to Network adapters, find the corresponding TP-Link adapter, right-click it, and select Properties.

Computer Management File Action View Help Computer Management (Local System Tools Task Scheduler Event Viewer Shared Folders Local Users and Groups Performance Device Manager Storage Disk Management Services and Applications tpicer Audio inputs and outputs Computer Disk drives Display adapters IDE A…

  1. If you see "This device is working properly." in the red box, the driver has been installed successfully.

TP-Link Adapter Properties General Advanced Driver Details Events Power Management TP-Link Adapter Device type: Network adapters Manufacturer: TP-Link Technologies Co., Ltd. Location: Port_#0006.Hub_#0003 Device status This device is working properly. OK Cancel

T3. What should I do if I can't connect to Wi-Fi after installing the driver?

• Refer to T2 to check if the driver for your adapter has been installed successfully. - Make sure the adapter is securely connected to the computer. - Disable antivirus software and firewall, then try again. - Try a different USB port on the computer. - Restart your computer and try again.

- Reinstall the driver and try again.

T4. How to find the hardware version of the adapter?

- The hardware version is printed on the product label on the package or the adapter. There is a character string "Ver:X.Y" (for example, Ver:2.0) in the Serial Number field, and the number X is the hardware version of the adapter.

Model: S/N:XXXXXXXXXXXX Ver:2.0

- Visit http://www.tp-link.com/faq-46.html and follow the second method to find the hardware version of the adapter.

For more detailed instructions:

  • Can't find the hardware version of the adapter: https://www.tp-link.com/faq-46.html
  • Can't find or join the wireless networks: https://www.tp-link.com/faq-2253.html
  • Can't install the driver: https://www.tp-link.com/faq-2252.html

Specifications are subject to change without notice. - is a registered trademark of TP-Link Technologies Co., Ltd. Other brands and product names are trademarks or registered trademarks of their respective holders.

No part of the specifications may be reproduced in any form or by any means or used to make any derivative such as translation, transformation, or adaptation without permission from TP-Link Technologies Co., Ltd. Copyright © 2019 TP-Link Technologies Co., Ltd. All rights reserved.

FCC compliance information statement

TP-LINK Archer T600U Plus - FCC compliance information statement - 1

Product Name: AC600 High Gain Wireless Dual Band USB Adapter

Model Number: Archer T2U Plus

Responsible party:

TP-Link USA Corporation, d/b/a TP-Link North America, Inc.

Address: 145 South State College Blvd. Suite 400, Brea, CA 92821

Website: https://www.tp-link.com/us/

Tel: +1 626 333 0234

This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures:

  • Reorient or relocate the receiving antenna.
  • Increase the separation between the equipment and receiver.
  • Connect the equipment into an outlet on a circuit different from that to which the receiver is connected.
  • Consult the dealer or an experienced radio/ TV technician for help.

This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions:

1) This device may not cause harmful interference. 2) This device must accept any interference received, including interference that may cause undesired operation.

Any changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment.

Note: The manufacturer is not responsible for any radio or TV interference caused by unauthorized modifications to this equipment. Such modifications could void the user's authority to operate the equipment.

FCC RF Radiation Exposure Statement:

This equipment complies with FCC radiation exposure limits set forth for an uncontrolled environment. End users must follow the specific operating instructions for satisfying RF exposure compliance. This transmitter must not be co-located or operating in conjunction with any other antenna or transmitter. This equipment has been SAR-evaluated for use in hand. SAR measurements are based on a 5mm spacing from the body and that compliance is achieved at that distance.

We, TP-Link USA Corporation, has determined that the equipment shown as above has been shown to comply with the applicable technical standards, FCC part 15. There is no unauthorized change is made in the equipment and the equipment is properly maintained and operated.

Issue Date: 2019.01.29

CE Mark Warning

CE

This is a class B product. In a domestic environment, this product may cause radio interference, in which case the user may be required to take adequate measures.

OPERATING FREQUENCY (the maximum transmitted power)

2400MHz-2483.5MHz (20dBm)

5150MHz-5250MHz (23dBm)

5250 MHz -5350 MHz (20dBm)

5470 MHz -5725 MHz (20dBm)

EU declaration of conformity

TP-Link hereby declares that the device is in compliance with the essential requirements and other relevant provisions of directives 2014/53/EU and 2011/65/EU.

The original EU declaration of conformity may be found at https://www.tp-link.com/en/ce.

RF Exposure Information

This device meets the EU requirements (2014/53/EU Article 3.1a) on the limitation of exposure of the general public to electromagnetic fields by way of health protection.

This device has been tested and meets the ICNIRP exposure guidelines and the European Standard EN 62209-2. SAR is measured with this device at a separation of 0.5 cm to the body, while transmitting at the highest certified output power level in all frequency bands of this device. Carry this device at least 0.5 cm away from your body to ensure exposure levels remain at or below the as-tested levels.

National restrictions

Attention: This device may only be used indoors in all EU member states and EFTA countries.

AT BE BG CH CY CZ DE DK
EE EL ES FI FR HR HU IE
IS IT LI LT LU LV MT NL
NO PL PT RO SE SI SK UK

Canadian Compliance Statement

This device contains licence-exempt transmitter(s)/receiver(s) that comply with Innovation, Science and Economic Development Canada's licence-exempt RSS(s). Operation is subject to the following two conditions:

1) This device may not cause interference.

2) This device must accept any interference, including interference that may cause undesired operation of the device.

1) The device for operation in the band 5150–5250 MHz is only for indoor use to reduce the potential for harmful interference to co-channel mobile satellite systems; 2) For devices with detachable antenna(s), the maximum antenna gain permitted for devices in the bands 5250-5350 MHz and 5470-5725 MHz shall be such that the equipment still complies with the e.i.r.p. limit; 3) For devices with detachable antenna(s), the maximum antenna gain permitted for devices in the band 5725-5850 MHz shall be such that the equipment still complies with the e.i.r.p. limits specified for point-to-point and non-point-to-point operation as appropriate; and

The high-power radars are allocated as primary users (i.e. priority users) of the bands 5250-5350 MHz and 5650-5850 MHz and that these radars could cause interference and/or damage to LE-LAN devices.

DFS (Dynamic Frequency Selection) products that operate in the bands 5250-5350 MHz, 5470-5600MHz, and 5650-5725MHz.

Warning:

Radiation Exposure Statement:

This EUT is compliant with SAR for general population/uncontrolled exposure limits in RSS-102 and has been tested in accordance with the measurement methods and procedures specified in IEEE 1528 and IEC 62209. This equipment should be installed and operated with a minimum distance of 1.0 cm between the radiator and your body. This device and its antenna(s) must not be co-located or operating in conjunction with any other antenna or transmitter.

Industry Canada Statement

CAN ICES-3 (B)/NMB-3(B)

Korea Warning Statements

  • Keep the device away from water, fire, humidity, or hot environments.
  • Do not attempt to disassemble, repair, or modify the device.
  • Do not use a damaged charger or USB cable to charge the device.
  • Do not use the device where wireless devices are not allowed.
  • This USB Adapter can be powered only by computers that comply with Limited Power Source (LPS).

Please read and follow the above safety information when operating the device. We cannot guarantee that no accidents or damage will occur due to improper use of the device. Please use this product with care and operate at your own risk.

Explanation of the symbols on the product label

SymbolExplanation
TP-LINK Archer T600U Plus - Korea Warning Statements - 1RECYCLINGThis product bears the selective sorting symbol for Waste electrical and electronic equipment (WEEE). This means that this product must be handled pursuant to European directive 2012/19/EU in order to be recycled or dismantled to minimize its impact on the environment.User has the choice to give his product to a competent recycling organization or to the retailer when he buys a new electrical or electronic equipment.
Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : TP-LINK

Model : Archer T600U Plus

Category : Network card / adapter