Vevor BJJ-1010 - Wall mount

BJJ-1010 - Wall mount Vevor - Free user manual and instructions

Find the device manual for free BJJ-1010 Vevor in PDF.

📄 64 pages English EN Download 💬 AI Question
Notice Vevor BJJ-1010 - page 1
Pick your language and provide your email: we'll send you a specifically translated version.

User questions about BJJ-1010 Vevor

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Wall mount in PDF format for free! Find your manual BJJ-1010 - Vevor and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. BJJ-1010 by Vevor.

USER MANUAL BJJ-1010 Vevor

Technical Support and E-Warranty Certificate www.vevor.com/support

BACKDROP STAND

USER MANUAL

MODEL NO.: BJJ-1010

We continue to be committed to provide you tools with competitive price. "Save Half", "Half Price" or any other similar expressions used by us only represents an estimate of savings you might benefit from buying certain tools with us compared to the major top brands and does not necessarily mean to co all categories of tools offered by us. You are kindly reminded to verify carefully when you are placing an order with us if you are actually Saving Half in comparison with the top major brands.

VEVOR®

TOUGH TOOLS, HALF PRICE

Backdrop Stand

MODEL NO.: BJJ-1010

Vevor BJJ-1010 - VEVOR® - 1

natural_image Simple line drawing of a rectangular frame with two vertical supports at the bottom (no text or symbols)

NEED HELP? CONTACT US!

Have product questions? Need technical support? Please feel free to contact us:

Technical Support and E-Warranty Certificate www.vevor.com/support

This is the original instruction, please read all manual instructions carefully before operating. VEVOR reserves a clear interpretation of o user manual. The appearance of the product shall be subject to the product you received. Please forgive us that we won't inform you ag there are any technology or software updates on our product.

WARNING:

Please read this manual carefully before using the product. Failure do so may result in serious injury.

ASSEMBLY PRECAUTIONS

  1. Assemble only according to these instructions. Improper assembly c create hazards.

  2. Wear ANSI-approved safety goggles and heavy-duty work gloves during assembly.

  3. Keep the assembly area clean and well-lit.

  4. Keep bystanders out of the area during assembly.

  5. Do not assemble when tired or when under the influence of alcohol drugs or medication.

  6. The product capabilities apply to properly and completely assembled products only.

  7. Assemble on a flat, level, hard and smooth surface capable of sa supporting the Backdrop Stand.

  8. For additional information regarding the parts listed in the following pages, please refer to the Assembly Diagram of this manual. Unwrap separate all parts in a clean work area.

SAVE THESE INSTRUCTIONS

USE PRECAUTIONS

TO PREVENT SERIOUS INJURY AND DEATH FROM TIPPING:

  1. This product is not a toy. Do not allow children to play with or item.
  2. Do not exceed weight capacities, before moving.
  3. Use only on a flat, hard and smooth surface capable of safely supporting a fully loaded Backdrop Stand.
  4. Use as intended only.
  5. Inspect before every use; do not use if parts are loose or damage

TECHNICAL SPECIFICATIONS

ModelBJJ-1010
Product Dimensions (LxWxH)(mm)3540*540*2980
Net Weight(kg)About 3.36

*Products such as specifications, appearance, and design are subject to modification without prior notice.

PACKAGE CONTENTS

AVevor BJJ-1010 - PACKAGE CONTENTS - 12EVevor BJJ-1010 - PACKAGE CONTENTS - 24
BVevor BJJ-1010 - PACKAGE CONTENTS - 31FVevor BJJ-1010 - PACKAGE CONTENTS - 42
CVevor BJJ-1010 - PACKAGE CONTENTS - 52GVevor BJJ-1010 - PACKAGE CONTENTS - 62
DVevor BJJ-1010 - PACKAGE CONTENTS - 71

ASSEMBLY STEPS

STEP 1
Vevor BJJ-1010 - ASSEMBLY STEPS - 1

text_image B*1 C*2 D*1 B C C D

Take one piece of B, two pieces of C and one piece of D, and connect them in the order shown in the figure.

STEP 2
Vevor BJJ-1010 - ASSEMBLY STEPS - 2

text_image Unscrew the claw screw

Take tripod A and unscrew the claw screw at the top.

STEP 3
Vevor BJJ-1010 - ASSEMBLY STEPS - 3

text_image Anchor point Anchor point Tips: This step is to locate the tripod position, ensure that the shelf is vertical up and down, and ensure that the shelf is stable.

Two people put the tripods at a proper distance, use the cross bar assembled in step 1 to locate the two tripods, and put the cross bar on the ground, with both ends of the cross bar at the positioning points (as shown in the figure).

STEP 4
Vevor BJJ-1010 - ASSEMBLY STEPS - 4

text_image Tighten the claw screw Step 1 Assembled crossbar Tighten the claw screw

After two people put the tripod at a proper distance, install the crossbar assembled in step 1.

STEP 5
Vevor BJJ-1010 - ASSEMBLY STEPS - 5

text_image Tips: After the shelf is stretched, make sure that the upper and lower distances are the same. It is best to measure it if you have a tape measure at home. If you don't have a tape measure, another person should stand at a distance and look at the upper and lower distances. Otherwise, the shelf will be unstable.

Two people will raise the tripod to a suitable height to ensure that the height of both sides is consistent and the crossbar is horizontal.

STEP 6
Vevor BJJ-1010 - ASSEMBLY STEPS - 6

text_image E*4 G*2 F*2 Installation position of sandbag Installation position of sandbag

2 sandbags, placed as shown in the figure after loading sand, to ensure the stability of the shelf; Four clips and two cloth clips are used according to the actual situation.

COMPLETION
Vevor BJJ-1010 - ASSEMBLY STEPS - 7

natural_image Simple line drawing of a two-part structure with vertical supports and a horizontal beam (no text or symbols)

Manufacturer: Shanghaimuxinmuyeyouxiangongsi

Address: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.

Imported to AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australia

Imported to USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730

UKREP

YH CONSULTING LIMITED. C/O YH Consulting

Limited Office 147, Centurion House, London

Road, Staines-upon-Thames, Surrey, TW18 4AX

ECREP

E-CrossStu GmbH

Mainzer Landstr.69,

60329 Frankfurt am Main.

VEVOR®

TOUGH TOOLS, HALF PRICE

Technical Support and E-Warranty Certificate

www.vevor.com/support

VEVOR®

TOUGH TOOLS, HALF PRICE

natural_image Simple line drawing of a rectangular frame with two vertical supports at the bottom (no text or symbols)

BESOIN D'AIDE? CONTACTEZ-NOUS!

Take one piece of B, two pieces of C and one piece of D, and connect them in the order shown in the figure.

STEP 2

Vevor BJJ-1010 - STEP 2 - 1

text_image Unscrew the claw screw

Take tripod A and unscrew the claw screw at the top.

ÉTAPE 3
Vevor BJJ-1010 - STEP 2 - 2

text_image Anchor point Tips: This step is to locate the tripod position, ensure that the shelf is vertical up and down, and ensure that the shelf is stable. Anchor point

Two people put the tripods at a proper distance, use the cross bar assembled in step 1 to locate the two tripods, and put the cross bar on the ground, with both ends of the cross bar at the positioning points (as shown in the figure).

STEP 4
Vevor BJJ-1010 - STEP 2 - 3

text_image Tighten the claw screw Step 1 Assembled crossbar Tighten the claw screw

After two people put the tripod at a proper distance, install the crossbar assembled in step 1.

STEP 5
Vevor BJJ-1010 - STEP 2 - 4

text_image Tips: After the shelf is stretched, make sure that the upper and lower distances are the same. It is best to measure it if you have a tape measure at home. If you don't have a tape measure, another person should stand at a distance and look at the upper and lower distances. Otherwise, the shelf will be unstable.

Two people will raise the tripod to a suitable height to ensure that the height of both sides is consistent and the crossbar is horizontal.

STEP 6
Vevor BJJ-1010 - STEP 2 - 5

text_image E*4 G*2 F*2 Installation position of sandbag Installation position of sandbag

2 sandbags, placed as shown in the figure after loading sand, to ensure the stability of the shelf; Four clips and two cloth clips are used according to the actual situation.

ACHÈVEMENT
Vevor BJJ-1010 - STEP 2 - 6

natural_image Simple line drawing of a two-part structure with vertical supports and a horizontal beam (no text or symbols)

Fabricant : Shanghaimuxinmuyeyouxiangongsi Adresse :

Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.

Importé en Australie : SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australie

YH CONSULTING LIMITED. C/O YH Consulting

Limited Bureau 147, Centurion House, London

Road, Staines-upon-Thames, Surrey, TW18 4AX

REPRÉSENTANTDE LA CE

E-CrossStu GmbH

Mainzer Landstr.69,

www.vevor.com/support

HINTERGRUNDSTÄNDER

BENUTZERHANDBUCH

MODELL NR.: BJJ-1010

natural_image Simple line drawing of a rectangular frame with two vertical supports at both ends (no text or symbols)

Take one piece of B, two pieces of C and one piece of D, and connect them in the order shown in the figure.

STEP 2
Vevor BJJ-1010 - MODELL NR.: BJJ-1010 - 1

text_image Unscrew the claw screw

Take tripod A and unscrew the claw screw at the top.

SCHRITT 3
Vevor BJJ-1010 - MODELL NR.: BJJ-1010 - 2

text_image Anchor point Tips: This step is to locate the tripod position, ensure that the shelf is vertical up and down, and ensure that the shelf is stable. Anchor point

Two people put the tripods at a proper distance, use the cross bar assembled in step 1 to locate the two tripods, and put the cross bar on the ground, with both ends of the cross bar at the positioning points (as shown in the figure).

STEP 4
Vevor BJJ-1010 - MODELL NR.: BJJ-1010 - 3

text_image Tighten the claw screw Step 1 Assembled crossbar Tighten the claw screw

After two people put the tripod at a proper distance, install the crossbar assembled in step 1.

STEP 5
Vevor BJJ-1010 - MODELL NR.: BJJ-1010 - 4

text_image Tips: After the shelf is stretched, make sure that the upper and lower distances are the same. It is best to measure it if you have a tape measure at home. If you don't have a tape measure, another person should stand at a distance and look at the upper and lower distances. Otherwise, the shelf will be unstable.

Two people will raise the tripod to a suitable height to ensure that the height of both sides is consistent and the crossbar is horizontal.

STEP 6
Vevor BJJ-1010 - MODELL NR.: BJJ-1010 - 5

text_image E*4 G*2 F*2 Installation position of sandbag Installation position of sandbag

2 sandbags, placed as shown in the figure after loading sand, to ensure the stability of the shelf; Four clips and two cloth clips are used according to the actual situation.

FERTIGSTELLUNG
Vevor BJJ-1010 - MODELL NR.: BJJ-1010 - 6

natural_image Simple line drawing of a two-part structure with vertical supports and a horizontal beam (no text or symbols)

Hersteller: Shanghaimuxinmuyeyouxiangongsi Adresse:

Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, Shanghai 200000 CN.

Nach AUS importiert: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australien

Importiert in die USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730

UKREP

YH CONSULTING LIMITED. C/O YH Consulting

Limited Office 147, Centurion House, London

Road, Staines-upon-Thames, Surrey, TW18 4AX

Vevor BJJ-1010 - MODELL NR.: BJJ-1010 - 7

www.vevor.com/support

VEVOR®

TOUGH TOOLS, HALF PRICE

elettronica www.vevor.com/support

SUPPORTO PER FONDALE

MANUALE D'USO

MODELLO N.: BJJ-1010

natural_image Simple line drawing of a rectangular frame with two vertical supports at the bottom (no text or symbols)

Take one piece of B, two pieces of C and one piece of D, and connect them in the order shown in the figure.

STEP 2

Vevor BJJ-1010 - STEP 2 - 1

text_image Unscrew the claw screw

Take tripod A and unscrew the claw screw at the top.

PASSO 3
Vevor BJJ-1010 - STEP 2 - 2

text_image Anchor point Tips: This step is to locate the tripod position, ensure that the shelf is vertical up and down, and ensure that the shelf is stable. Anchor point

Two people put the tripods at a proper distance, use the cross bar assembled in step 1 to locate the two tripods, and put the cross bar on the ground, with both ends of the cross bar at the positioning points (as shown in the figure).

STEP 4
Vevor BJJ-1010 - STEP 2 - 3

text_image Tighten the claw screw Step 1 Assembled crossbar Tighten the claw screw

After two people put the tripod at a proper distance, install the crossbar assembled in step 1.

STEP 5
Vevor BJJ-1010 - STEP 2 - 4

text_image Tips: After the shelf is stretched, make sure that the upper and lower distances are the same. It is best to measure it if you have a tape measure at home. If you don't have a tape measure, another person should stand at a distance and look at the upper and lower distances. Otherwise, the shelf will be unstable.

Two people will raise the tripod to a suitable height to ensure that the height of both sides is consistent and the crossbar is horizontal.

STEP 6
Vevor BJJ-1010 - STEP 2 - 5

text_image E*4 G*2 F*2 Installation position of sandbag Installation position of sandbag

2 sandbags, placed as shown in the figure after loading sand, to ensure the stability of the shelf; Four clips and two cloth clips are used according to the actual situation.

COMPLETAMENTO
Vevor BJJ-1010 - STEP 2 - 6

natural_image Simple line drawing of a two-part structure with vertical supports and a horizontal beam (no text or symbols)

Importato in AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australia

Importato negli USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730

Vevor BJJ-1010 - STEP 2 - 7

text_image RAPPRESENTANZA DEL REGNO UNITO

YH CONSULTING LIMITED. C/O YH Consulting

Limited Ufficio 147, Centurion House, London

Road, Staines-upon-Thames, Surrey, TW18 4AX

www.vevor.com/support

VEVOR®

TOUGH TOOLS, HALF PRICE

www.vevor.com/support

SOPORTE DE FONDO

MANUAL DEL USUARIO

N.° DE MODELO: BJJ-1010

natural_image Simple line drawing of a rectangular frame with two vertical supports at the bottom (no text or symbols)

Take one piece of B, two pieces of C and one piece of D, and connect them in the order shown in the figure.

STEP 2

Vevor BJJ-1010 - STEP 2 - 1

text_image Unscrew the claw screw

Take tripod A and unscrew the claw screw at the top.

PASO 3
Vevor BJJ-1010 - STEP 2 - 2

text_image Anchor point Tips: This step is to locate the tripod position, ensure that the shelf is vertical up and down, and ensure that the shelf is stable. Anchor point

Two people put the tripods at a proper distance, use the cross bar assembled in step 1 to locate the two tripods, and put the cross bar on the ground, with both ends of the cross bar at the positioning points (as shown in the figure).

STEP 4
Vevor BJJ-1010 - STEP 2 - 3

text_image Tighten the claw screw Step 1 Assembled crossbar Tighten the claw screw

After two people put the tripod at a proper distance, install the crossbar assembled in step 1.

STEP 5
Vevor BJJ-1010 - STEP 2 - 4

text_image Tips: After the shelf is stretched, make sure that the upper and lower distances are the same. It is best to measure it if you have a tape measure at home. If you don't have a tape measure, another person should stand at a distance and look at the upper and lower distances. Otherwise, the shelf will be unstable.

Two people will raise the tripod to a suitable height to ensure that the height of both sides is consistent and the crossbar is horizontal.

STEP 6
Vevor BJJ-1010 - STEP 2 - 5

text_image E*4 G*2 F*2 Installation position of sandbag Installation position of sandbag

2 sandbags, placed as shown in the figure after loading sand, to ensure the stability of the shelf; Four clips and two cloth clips are used according to the actual situation.

TERMINACIÓN
Vevor BJJ-1010 - STEP 2 - 6

natural_image Simple line drawing of a two-part structure with vertical supports and a horizontal beam (no text or symbols)

Road, Staines-upon-Thames, Surrey, TW18 4AX

Vevor BJJ-1010 - STEP 2 - 7

text_image REPRESENTANTE CE

E-CrossStu GmbH

www.vevor.com/support

VEVOR®

TOUGH TOOLS, HALF PRICE

natural_image Simple line drawing of a rectangular frame with two vertical supports at both ends (no text or symbols)

POTRZEBUJESZ POMOCY? SKONTAKTUJ SIĘ Z NAMI!

Take one piece of B, two pieces of C and one piece of D, and connect them in the order shown in the figure.

STEP 2

Vevor BJJ-1010 - STEP 2 - 1

text_image Unscrew the claw screw

Take tripod A and unscrew the claw screw at the top.

KROK 3
Vevor BJJ-1010 - STEP 2 - 2

text_image Anchor point Tips: This step is to locate the tripod position, ensure that the shelf is vertical up and down, and ensure that the shelf is stable. Anchor point

Two people put the tripods at a proper distance, use the cross bar assembled in step 1 to locate the two tripods, and put the cross bar on the ground, with both ends of the cross bar at the positioning points (as shown in the figure).

STEP 4
Vevor BJJ-1010 - STEP 2 - 3

text_image Tighten the claw screw Step 1 Assembled crossbar Tighten the claw screw

After two people put the tripod at a proper distance, install the crossbar assembled in step 1.

STEP 5
Vevor BJJ-1010 - STEP 2 - 4

text_image Tips: After the shelf is stretched, make sure that the upper and lower distances are the same. It is best to measure it if you have a tape measure at home. If you don't have a tape measure, another person should stand at a distance and look at the upper and lower distances. Otherwise, the shelf will be unstable.

Two people will raise the tripod to a suitable height to ensure that the height of both sides is consistent and the crossbar is horizontal.

STEP 6
Vevor BJJ-1010 - STEP 2 - 5

text_image E*4 G*2 F*2 Installation position of sandbag Installation position of sandbag

2 sandbags, placed as shown in the figure after loading sand, to ensure the stability of the shelf; Four clips and two cloth clips are used according to the actual situation.

UKOŃCZENIE
Vevor BJJ-1010 - STEP 2 - 6

natural_image Simple line drawing of a two-part structure with vertical supports and a horizontal beam (no text or symbols)

Producent: Shanghaimuxinmuyeyouxiangongsi Adres:

Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, szanghaj 200000 CN.

Importowane do AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australia

Importowane do USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730

REP WIEL KIEJ BRYTANII

YH CONSULTING LIMITED. C/O YH Consulting Limited

Biuro 147, Centurion House, London Road, Staines-upon-Thames, Surrey, TW18 4AX

Przedstawiciel UE

E-CrossStu GmbH

Mainzer Landstr.69,

60329 Frankfurt nad Menem.

VEVOR®

TOUGH TOOLS, HALF PRICE

www.vevor.com/support

VEVOR®

TOUGH TOOLS, HALF PRICE

www.vevor.com/support

ACHTERGRONDSTANDAARD

GEBRUIKERSHANDLEIDING

MODELNUMMER: BJJ-1010

natural_image Simple line drawing of a rectangular frame with two vertical supports at both ends (no text or symbols)

HULP NODIG? NEEM CONTACT MET ONS OP!

Take one piece of B, two pieces of C and one piece of D, and connect them in the order shown in the figure.

STEP 2
Vevor BJJ-1010 - HULP NODIG? NEEM CONTACT MET ONS OP! - 1

text_image Unscrew the claw screw

Take tripod A and unscrew the claw screw at the top.

STAP 3
Vevor BJJ-1010 - HULP NODIG? NEEM CONTACT MET ONS OP! - 2

text_image Anchor point Tips: This step is to locate the tripod position, ensure that the shelf is vertical up and down, and ensure that the shelf is stable. Anchor point

Two people put the tripods at a proper distance, use the cross bar assembled in step 1 to locate the two tripods, and put the cross bar on the ground, with both ends of the cross bar at the positioning points (as shown in the figure).

STEP 4
Vevor BJJ-1010 - HULP NODIG? NEEM CONTACT MET ONS OP! - 3

text_image Tighten the claw screw Step 1 Assembled crossbar Tighten the claw screw

After two people put the tripod at a proper distance, install the crossbar assembled in step 1.

STEP 5
Vevor BJJ-1010 - HULP NODIG? NEEM CONTACT MET ONS OP! - 4

text_image Tips: After the shelf is stretched, make sure that the upper and lower distances are the same. It is best to measure it if you have a tape measure at home. If you don't have a tape measure, another person should stand at a distance and look at the upper and lower distances. Otherwise, the shelf will be unstable.

Two people will raise the tripod to a suitable height to ensure that the height of both sides is consistent and the crossbar is horizontal.

STEP 6
Vevor BJJ-1010 - HULP NODIG? NEEM CONTACT MET ONS OP! - 5

text_image E*4 G*2 F*2 Installation position of sandbag Installation position of sandbag

2 sandbags, placed as shown in the figure after loading sand, to ensure the stability of the shelf; Four clips and two cloth clips are used according to the actual situation.

VOLTOOING
Vevor BJJ-1010 - HULP NODIG? NEEM CONTACT MET ONS OP! - 6

natural_image Simple line drawing of a two-part structure with vertical supports and a horizontal beam (no text or symbols)

Fabrikant: Shanghaimuxinmuyeyouxiangongsi Adres:

Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.

YH CONSULTING LIMITED. C/O YH Consulting

Limited Kantoor 147, Centurion House, London

Road, Staines-upon-Thames, Surrey, TW18 4AX

Vevor BJJ-1010 - HULP NODIG? NEEM CONTACT MET ONS OP! - 7

text_image EC-REP

E-CrossStu GmbH

Mainzer Landstr.69,

www.vevor.com/support

VEVOR®

TOUGH TOOLS, HALF PRICE

www.vevor.com/support

BAKGRUNDSTÄLL

ANVÄNDARMANUAL

MODELLNR: BJJ-1010

natural_image Simple line drawing of a rectangular frame with two vertical supports at both ends (no text or symbols)

BEHÖVER HJÄLP? KONTAKTA OSS!

Take one piece of B, two pieces of C and one piece of D, and connect them in the order shown in the figure.

STEP 2
Vevor BJJ-1010 - BEHÖVER HJÄLP? KONTAKTA OSS! - 1

text_image Unscrew the claw screw

Take tripod A and unscrew the claw screw at the top.

STEG 3
Vevor BJJ-1010 - BEHÖVER HJÄLP? KONTAKTA OSS! - 2

text_image Anchor point Tips: This step is to locate the tripod position, ensure that the shelf is vertical up and down, and ensure that the shelf is stable. Anchor point

Two people put the tripods at a proper distance, use the cross bar assembled in step 1 to locate the two tripods, and put the cross bar on the ground, with both ends of the cross bar at the positioning points (as shown in the figure).

STEP 4
Vevor BJJ-1010 - BEHÖVER HJÄLP? KONTAKTA OSS! - 3

text_image Tighten the claw screw Step 1 Assembled crossbar Tighten the claw screw

After two people put the tripod at a proper distance, install the crossbar assembled in step 1.

STEP 5
Vevor BJJ-1010 - BEHÖVER HJÄLP? KONTAKTA OSS! - 4

text_image Tips: After the shelf is stretched, make sure that the upper and lower distances are the same. It is best to measure it if you have a tape measure at home. If you don't have a tape measure, another person should stand at a distance and look at the upper and lower distances. Otherwise, the shelf will be unstable.

Two people will raise the tripod to a suitable height to ensure that the height of both sides is consistent and the crossbar is horizontal.

STEP 6
Vevor BJJ-1010 - BEHÖVER HJÄLP? KONTAKTA OSS! - 5

text_image E*4 G*2 F*2 Installation position of sandbag Installation position of sandbag

2 sandbags, placed as shown in the figure after loading sand, to ensure the stability of the shelf; Four clips and two cloth clips are used according to the actual situation.

KOMPLETTERING
Vevor BJJ-1010 - BEHÖVER HJÄLP? KONTAKTA OSS! - 6

natural_image Simple line drawing of a two-part structure with vertical supports and a horizontal beam (no text or symbols)

Tillverkare: Shanghaimuxinmuyeyouxiangongsi Adress:

Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.

Importerad till AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australien

Importerad till USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730

UKREP

YH CONSULTING LIMITED. C/O YH Consulting

Limited Office 147, Centurion House, London

Road, Staines-upon-Thames, Surrey, TW18 4AX

ECREP

E-CrossStu GmbH

Mainzer Landstr.69,

60329 Frankfurt am Main.

VEVOR®

TOUGH TOOLS, HALF PRICE

www.vevor.com/support

Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : Vevor

Model : BJJ-1010

Category : Wall mount