BJJ-TB8510 - Wall mount Vevor - Free user manual and instructions

Find the device manual for free BJJ-TB8510 Vevor in PDF.

Vevor BJJ-TB8510 - Wall mount
📄 96 pages English EN Download 💬 AI Question 10 questions ⚙️ Specs
Notice Vevor BJJ-TB8510 - page 3
Pick your language and provide your email: we'll send you a specifically translated version.
Product Type Wall-mounted backdrop stand
Brand Vevor
Model BJJ-TB8510
Product Dimensions (L x W x H) 3200 x 325 x 2600 mm
Net Weight Approximately 5.06 kg
Power Supply None (non-electrical product)
Main Material Metal (steel)
Color Black (estimated)
Intended Use Support for photographic, video, studio backdrops
Number of Feet 2 (tripod configuration)
Adjustable Height Yes, up to 2600 mm
Adjustable Width Yes, up to 3200 mm
Maximum Load Capacity Not specified, designed for standard backdrops
Assembly Required Yes, simple assembly according to manual
Safety Precautions Use on a flat surface, do not exceed load, inspect before use
Maintenance and Cleaning Clean with a dry cloth, avoid abrasive products
Spare Parts Contact customer service via www.vevor.com/support
Warranty Electronic warranty, online technical support
Country of Import (United States) Sanven Technology Ltd., Rancho Cucamonga, CA

Frequently Asked Questions - BJJ-TB8510 Vevor

What is the maximum height of the stand?
The maximum height is 2600 mm (2.6 meters).
What is the maximum width of the stand?
The maximum width is 3200 mm (3.2 meters).
Is the stand foldable for storage?
Yes, the stand can be disassembled and folded for easy storage.
What is the weight of the stand?
The net weight is approximately 5.06 kg.
Is the stand electrical?
No, the stand is completely manual, no power supply required.
What type of backdrop can I use?
You can use standard fabric, vinyl, or paper backdrops within the stand's dimensions.
How do I assemble the stand?
Follow the assembly steps in the manual: unpack all parts, identify them according to the diagram, then assemble on a flat, hard surface.
Is the stand stable on uneven floor?
It is recommended to use the stand on a flat, hard surface. On uneven ground, stability may be compromised.
Where can I find spare parts?
Contact customer service via www.vevor.com/support for spare parts and warranty.
How do I clean the stand?
Clean with a soft, dry cloth. Avoid abrasive or corrosive cleaners.

User questions about BJJ-TB8510 Vevor

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

Your email remains private: it is only used to notify you if someone answers your question.

No questions yet. Be the first to ask one.

Download the instructions for your Wall mount in PDF format for free! Find your manual BJJ-TB8510 - Vevor and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. BJJ-TB8510 by Vevor.

USER MANUAL BJJ-TB8510 Vevor

Technical Support and E-Warranty Certificate www.vevor.com/support

BACKDROP STAND

USER MANUAL

MODEL NO.: BJJ-TB8510

We continue to be committed to provide you tools with competitive price. "Save Half", "Half Price" or any other similar expressions used by us only represents an estimate of savings you might benefit from buying certain tools with us compared to the major top brands and does not necessarily mean to cover all categories of tools offered by us. You are kindly reminded to verify carefully when you are placing an order with us if you are actually saving half in comparison with the top major brands.

VEVOR®

TOUGH TOOLS, HALF PRICE

Backdrop Stand

MODEL NO.: BJJ-TB8510

Pure structural frame diagram with vertical supports and horizontal beams (no text or symbols)

NEED HELP? CONTACT US!

Have product questions? Need technical support? Please feel free to contact us:

Technical Support and E-Warranty Certificate www.vevor.com/support

This is the original instruction. Please read all manual instructions carefully before operating. VEVOR reserves a clear interpretation of the user manual. The appearance of the product shall be subject to the product you received. Please forgive us that we won't inform you again if there are any technology or software updates on our product.

Vevor BJJ-TB8510 - NEED HELP? CONTACT US! - 1

WARNING:

Please read this manual carefully before using the product. Failure to do so may result in serious injury.

ASSEMBLY PRECAUTIONS

  1. Assemble only according to these instructions. Improper assembly can create hazards.
  2. Wear ANSI-approved safety goggles and heavy-duty work gloves during assembly.
  3. Keep the assembly area clean and well-lit.
  4. Keep bystanders out of the area during assembly.
  5. Do not assemble when tired or when under the influence of alcohol, drugs, or medication.
  6. The product capabilities apply to properly and completely assembled products only.
  7. Assemble on a flat, level, hard, and smooth surface capable of safely supporting the Backdrop Stand.
  8. For additional information regarding the parts listed in the following pages, please refer to the Assembly Diagram of this manual. Unwrap and separate all parts in a clean work area.

SAVE THESE INSTRUCTIONS

USE PRECAUTIONS

TO PREVENT SERIOUS INJURY AND DEATH FROM TIPPING:

  1. This product is not a toy. Do not allow children to play with or near this item.
  2. Do not exceed weight capacities. Before moving, ensure the stand is stable.
  3. Use only on a flat, hard, and smooth surface capable of safely supporting a fully loaded Backdrop Stand.
  4. Use as intended only.
  5. Inspect before every use; do not use if parts are loose or damaged.

TECHNICAL SPECIFICATIONS

ModelBJJ-TB8510
Product Dimensions (LxWxH)(mm)3200*325*2600
Net Weight(kg)About 5.06

*Products such as specifications, appearance, and design are subject to modification without prior notice.

PACKAGE CONTENTS

AVevor BJJ-TB8510 - PACKAGE CONTENTS - 12FVevor BJJ-TB8510 - PACKAGE CONTENTS - 22
BVevor BJJ-TB8510 - PACKAGE CONTENTS - 31GVevor BJJ-TB8510 - PACKAGE CONTENTS - 44
CVevor BJJ-TB8510 - PACKAGE CONTENTS - 51HVevor BJJ-TB8510 - PACKAGE CONTENTS - 62
DVevor BJJ-TB8510 - PACKAGE CONTENTS - 71IVevor BJJ-TB8510 - PACKAGE CONTENTS - 82
EVevor BJJ-TB8510 - PACKAGE CONTENTS - 91

ASSEMBLY STEPS

STEP 1B*1 C*1 D*1 B C D

Take one piece of B, one piece of C, and one piece of D, and connect them in the order shown in the figure.

STEP 2graph TD A["Start"] --> B{Condition} B -->|Yes| C["Process Step 1"] B -->|No| D["Process Step 2"] C --> E["End"] D --> F["End"]

Take material E and material F (telescopic rod), connect them two times, for a total of two groups, and screw out the claw screw at the top.

STEP 3 A I

Take material A and material I (screws) and connect them with the vertical rod in step 2 as shown in the figure.

STEP 4

After placing the vertical rod assembled in step 3 at a proper distance, two people install the horizontal rod assembled in step 1 and tighten the claw screws.

STEP 5Tighten the claw screw Tighten the claw screw Tips: After the shelf is stretched, make sure that the upper and lower distances are the same. It is best to measure it if you have a tape measure at home. If you don't have a tape measure, another person should stand at a distance and look at the upper…

Two people will raise the tripod to a suitable height to ensure that the height of both sides is consistent and the crossbar is horizontal.

STEP 6G*4 F*2 Installation position of sandbag Installation position of sandbag

2 sandbags, placed as shown in the figure after loading sand, to ensure the stability of the shelf; Four cloth clips are used according to the actual situation.

COMPLETION

Pure structural frame diagram with vertical and horizontal lines, no text or symbols present

Manufacturer: Shanghai Muxin Wood Industry Co., Ltd.

Address: Room 1602A-1609, No. 11, Lane 803, Shuangcheng Road, Baoshan District, Shanghai 200000, CN.

Imported to AUS: SIHAO PTY LTD. 1 ROKEVA STREET, EASTWOOD NSW 2122, Australia

Imported to USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730

UKREP

YH CONSULTING LIMITED. C/O YH Consulting

Limited Office 147, Centurion House, London

Road, Staines-upon-Thames, Surrey, TW18 4AX

ECREP

E-CrossStu GmbH

Mainzer Landstr. 69,

60329 Frankfurt am Main.

VEVOR®

TOUGH TOOLS, HALF PRICE

Technical Support and E-Warranty Certificate

www.vevor.com/support

VEVOR®

TOUGH TOOLS, HALF PRICE

NEED HELP? CONTACT US!

Take one piece of B, one piece of C, and one piece of D, and connect them in the order shown in the figure.

STEP 2graph TD A["Start"] --> B["E"] B --> C["+"] C --> D["-"] D --> E["F"] E --> F["End"] G["Start"] --> H["+"] H --> I["+"] I --> J["End"]

Take material E and material F (telescopic rod), connect them twice, making a total of two groups, and unscrew the claw screw at the top.

STEP 3Pure electrical circuit lines without any symbols

Take material A and material I (screws) and connect them with the vertical rod from step 2 as shown in the figure.

STEP 4Pure structural diagram of a frame with vertical supports and base plates, no text or symbols present

After placing the vertical rod assembled in step 3 at a proper distance, two people install the horizontal rod assembled in step 1 and tighten the claw screws.

STEP 5Tighten the claw screw Tighten the claw screw Tips: After the shelf is stretched, make sure that the upper and lower distances are the same. It is best to measure it if you have a tape measure at home. If you don't have a tape measure, another person should stand at a distance and look at the upper…

Two people will raise the tripod to a suitable height to ensure that the height of both sides is consistent and the crossbar is horizontal.

STEP 6G*4 F*2 Installation position of sandbag Installation position of sandbag

2 sandbags, placed as shown in the figure after loading sand, to ensure the stability of the shelf; Four cloth clips are used according to the actual situation.

COMPLETION

Pure structural frame diagram with vertical and horizontal lines, no text or symbols present

Manufacturer: Shanghaimuxinmuyeyouxiangongsi Address:

Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.

Imported into Australia: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australia

YH CONSULTING LIMITED. C/O YH Consulting

Limited Bureau 147, Centurion House, London

Road, Staines-upon-Thames, Surrey, TW18 4AX

EC REPRESENTATIVE

E-CrossStu GmbH

Mainzer Landstr.69,

www.vevor.com/support

BACKGROUND STAND

USER MANUAL

MODEL NO.: BJJ-TB8510

Take one piece of B, one piece of C and one piece of D, and connect them in the order shown in the figure.

STEP 2graph TD A["Start"] --> B["E"] B --> C["+"] C --> D["-"] D --> E["F"] E --> F["End"] G["Start"] --> H["+"] H --> I["+"] I --> J["End"]

Take material E and material F (telescopic rod), connect them two times, making a total of two groups, and screw out the claw screw at the top.

STEP 3 A I

Take material A and material I (screws) and connect them with the vertical rod from step 2 as shown in the figure.

STEP 4

After placing the vertical rod assembled in step 3 at a proper distance, two people install the horizontal rod assembled in step 1 and tighten the claw screws.

STEP 5Tighten the claw screw. Tips: After the shelf is stretched, make sure that the upper and lower distances are the same. It is best to measure it if you have a tape measure at home. If you don't have a tape measure, another person should stand at a distance and look at the upper and lower distances. O…

Two people will raise the tripod to a suitable height to ensure that the height of both sides is consistent and the crossbar is horizontal.

STEP 6G*4 F*2 Installation position of sandbag

2 sandbags, placed as shown in the figure after loading sand, to ensure the stability of the shelf; Four cloth clips are used according to the actual situation.

COMPLETION

Pure structural frame diagram with vertical and horizontal lines, no text or symbols present

Manufacturer: Shanghaimuxinmuyeyouxiangongsi Address:

Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, Shanghai 200000 CN.

Imported into Australia: SIHAO PTY LTD. 1 ROKEVA STREET EASTWOOD NSW 2122 Australia

Imported into the USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730

UK REP

YH CONSULTING LIMITED. C/O YH Consulting

Limited Office 147, Centurion House, London

Road, Staines-upon-Thames, Surrey, TW18 4AX

Vevor BJJ-TB8510 - COMPLETION - 3

www.vevor.com/support

VEVOR®

TOUGH TOOLS, HALF PRICE

www.vevor.com/support

SUPPORTO PER FONDALE

MANUALE D'USO

MODELLO NUMERO: BJJ-TB8510

www.vevor.com/support

Take one piece of B, one piece of C, and one piece of D, and connect them in the order shown in the figure.

STEP 2graph TD A["Start"] --> B["E"] B --> C["+"] C --> D["-"] D --> E["F"] E --> F["End"] G["Start"] --> H["+"] H --> I["+"] I --> J["End"]

Take material E and material F (telescopic rod), connect them two times, for a total of two groups, and screw out the claw screw at the top.

STEP 3 A I

Take material A and material I (screws) and connect them with the vertical rod in step 2 as shown in the figure.

STEP 4

After placing the vertical rod assembled in step 3 at a proper distance, two people install the horizontal rod assembled in step 1 and tighten the claw screws.

STEP 5Tighten the claw screw. Tips: After the shelf is stretched, make sure that the upper and lower distances are the same. It is best to measure it if you have a tape measure at home. If you don't have a tape measure, another person should stand at a distance and look at the upper and lower distances. O…

Two people will raise the tripod to a suitable height to ensure that the height of both sides is consistent and the crossbar is horizontal.

STEP 6G*4 F*2 Installation position of sandbag

Place 2 sandbags as shown in the figure after loading sand to ensure the stability of the shelf. Use four cloth clips according to the actual situation.

COMPLETION

Pure structural frame diagram with vertical and horizontal lines, no text or symbols present

Imported in Australia: SIHAO PTY LTD. 1 ROKEVA STREET, EASTWOOD NSW 2122, Australia

Imported in the USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730

RAPPRESENTANZA DEL REGNO UNITO

YH CONSULTING LIMITED. C/O YH Consulting

Limited, Office 147, Centurion House, London

Road, Staines-upon-Thames, Surrey, TW18 4AX

Vevor BJJ-TB8510 - COMPLETION - 3

www.vevor.com/support

BASE SUPPORT

USER MANUAL

MODEL NUMBER: BJJ-TB8510

Take one piece of B, one piece of C, and one piece of D, and connect them in the order shown in the figure.

STEP 2graph TD A["Start"] --> B["E"] B --> C["+"] C --> D["-"] D --> E["F"] E --> F["End"] G["Start"] --> H["+"] H --> I["+"] I --> J["End"]

Take material E and material F (telescopic rod), connect them two times, making a total of two groups, and screw out the claw screw at the top.

STEP 3 A

Take material A and material I (screws) and connect them with the vertical rod in step 2 as shown in the figure.

STEP 4

After placing the vertical rod assembled in step 3 at a proper distance, two people install the horizontal rod assembled in step 1 and tighten the claw screws.

STEP 5Tighten the claw screw. Tips: After the shelf is stretched, make sure that the upper and lower distances are the same. It is best to measure it if you have a tape measure at home. If you don't have a tape measure, another person should stand at a distance and look at the upper and lower distances. O…

Two people will raise the tripod to a suitable height to ensure that the height of both sides is consistent and the crossbar is horizontal.

STEP 6G*4, F*2. Installation position of sandbag.

2 sandbags, placed as shown in the figure after loading sand, to ensure the stability of the shelf; Four cloth clips are used according to the actual situation.

Pure structural frame diagram with vertical and horizontal lines, no text or symbols present.

REPRESENTANTE CE

Take one piece of B, one piece of C and one piece of D, and connect them in the order shown in the figure.

STEP 2graph TD A["Start"] --> B["E"] B --> C["+"] C --> D["-"] D --> E["F"] E --> F["End"] G["Start"] --> H["+"] H --> I["+"] I --> J["End"]

Take material E and material F (telescopic rod), connect them two times, a total of two groups, and screw out the claw screw at the top.

STEP 3 A

Take material A and material I (screws) and connect them with the vertical rod in step 2 as shown in the figure.

STEP 4

After placing the vertical rod assembled in step 3 at a proper distance, two people install the horizontal rod assembled in step 1 and tighten the claw screws.

STEP 5Tighten the claw screw. Tips: After the shelf is stretched, make sure that the upper and lower distances are the same. It is best to measure it if you have a tape measure at home. If you don't have a tape measure, another person should stand at a distance and look at the upper and lower distances. O…

Two people will raise the tripod to a suitable height to ensure that the height of both sides is consistent and the crossbar is horizontal.

STEP 6G*4, F*2. Installation position of sandbag.

2 sandbags, placed as shown in the figure after loading sand, to ensure the stability of the shelf; Four cloth clips are used according to the actual situation.

COMPLETION

Pure structural frame diagram with vertical and horizontal lines, no text or symbols present.

Manufacturer: Shanghai Muxin Wood Industry Co., Ltd. Address:

Room 1602A-1609, No. 11, Lane 803, Shuangcheng Road, Baoshan District, Shanghai 200000 CN.

Imported into AUS: SIHAO PTY LTD. 1 ROKEVA STREET EASTWOOD NSW 2122 Australia

Imported into USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730

REP WIEL KIEJ BRYTANII

YH CONSULTING LIMITED. C/O YH Consulting Limited Office 147, Centurion House, London Road, Staines- upon-Thames, Surrey, TW18 4AX

Przedstaw ciel UE

E-CrossStu GmbH

Mainzer Landstr.69,

60329 Frankfurt am Main.

VEVOR®

TOUGH TOOLS, HALF PRICE

www.vevor.com/support

BACKGROUND STANDARD

USER MANUAL

MODEL NUMBER: BJJ-TB8510

NEED HELP? CONTACT US!

Take one piece of B, one piece of C, and one piece of D, and connect them in the order shown in the figure.

STEP 2graph TD A["Start"] --> B["E"] B --> C["+"] C --> D["-"] D --> E["F"] E --> F["End"] G["Start"] --> H["+"] H --> I["+"] I --> J["End"]

Take material E and material F (telescopic rod), connect them two times, for a total of two groups, and screw out the claw screw at the top.

STEP 3 A

Take material A and material I (screws) and connect them with the vertical rod in step 2 as shown in the figure.

STEP 4

After placing the vertical rod assembled in step 3 at a proper distance, two people install the horizontal rod assembled in step 1 and tighten the claw screws.

STEP 5Tighten the claw screw. Tips: After the shelf is stretched, make sure that the upper and lower distances are the same. It is best to measure it if you have a tape measure at home. If you don't have a tape measure, another person should stand at a distance and look at the upper and lower distances. O…

Two people will raise the tripod to a suitable height to ensure that the height of both sides is consistent and the crossbar is horizontal.

STEP 6G*4 F*2 Installation position of sandbag

2 sandbags, placed as shown in the figure after loading sand, to ensure the stability of the shelf; Four cloth clips are used according to the actual situation.

COMPLETION

Pure structural frame diagram with vertical and horizontal lines, no text or symbols present

Manufacturer: Shanghaimuxinmuyeyouxiangongsi Address:

Room 1602A-1609, No. 11, Lane 803, Shuangcheng Road, Baoshan District, Shanghai 200000 CN.

YH CONSULTING LIMITED. C/O YH Consulting

Limited Office 147, Centurion House, London

Road, Staines-upon-Thames, Surrey, TW18 4AX

EC-REP

E-CrossStu GmbH

Mainzer Landstr.69,

warranty certificate www.vevor.com/support

VEVOR®

TOUGH TOOLS, HALF PRICE

www.vevor.com/support

BAKGRUNDSTÄLL

USER MANUAL

MODEL NO: BJJ-TB8510

NEED HELP? CONTACT US!

Take one piece of B, one piece of C, and one piece of D, and connect them in the order shown in the figure.

STEP 2graph TD A["Start"] --> B["E"] B --> C["+"] C --> D["-"] D --> E["F"] E --> F["End"] G["Start"] --> H["+"] H --> I["+"] I --> J["End"]

Take material E and material F (telescopic rod), connect them two times, making a total of two groups, and screw out the claw screw at the top.

STEP 3 A

Take material A and material I (screws) and connect them with the vertical rod from step 2 as shown in the figure.

STEP 4

After placing the vertical rod assembled in step 3 at a proper distance, two people install the horizontal rod assembled in step 1 and tighten the claw screws.

STEP 5Tighten the claw screw. Tips: After the shelf is stretched, make sure that the upper and lower distances are the same. It is best to measure it if you have a tape measure at home. If you don't have a tape measure, another person should stand at a distance and look at the upper and lower distances. O…

Two people will raise the tripod to a suitable height to ensure that the height on both sides is consistent and the crossbar is horizontal.

STEP 6G*4 F*2 Installation position of sandbag

2 sandbags, placed as shown in the figure after loading sand, to ensure the stability of the shelf; Four cloth clips are used according to the actual situation.

COMPLETION

Pure structural frame diagram with vertical and horizontal lines, no text or symbols present

Manufacturer: Shanghaimuxinmuyeyouxiangongsi Address:

Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.

Imported to AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australia

Imported to USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730

UKREP

YH CONSULTING LIMITED. C/O YH Consulting

Limited Office 147, Centurion House, London

Road, Staines-upon-Thames, Surrey, TW18 4AX

ECREP

E-CrossStu GmbH

Mainzer Landstr.69,

60329 Frankfurt am Main.

VEVOR®

TOUGH TOOLS, HALF PRICE

www.vevor.com/support

Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : Vevor

Model : BJJ-TB8510

Category : Wall mount