Vevor BJJ-TB8510 - Wall mount

BJJ-TB8510 - Wall mount Vevor - Free user manual and instructions

Find the device manual for free BJJ-TB8510 Vevor in PDF.

📄 96 pages English EN Download 💬 AI Question
Notice Vevor BJJ-TB8510 - page 3
Pick your language and provide your email: we'll send you a specifically translated version.

User questions about BJJ-TB8510 Vevor

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Wall mount in PDF format for free! Find your manual BJJ-TB8510 - Vevor and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. BJJ-TB8510 by Vevor.

USER MANUAL BJJ-TB8510 Vevor

Technical Support and E-Warranty Certificate www.vevor.com/support

BACKDROP STAND

USER MANUAL

MODEL NO.: BJJ-TB8510

We continue to be committed to provide you tools with competitive price. "Save Half", "Half Price" or any other similar expressions used by us only represents an estimate of savings you might benefit from buying certain tools with us compared to the major top brands and does not necessarily mean to co all categories of tools offered by us. You are kindly reminded to verify carefully when you are placing an order with us if you are actually Saving Half in comparison with the top major brands.

VEVOR®

TOUGH TOOLS, HALF PRICE

Backdrop Stand

MODEL NO.: BJJ-TB8510

Vevor BJJ-TB8510 - VEVOR® - 1

natural_image Pure structural frame diagram with vertical supports and horizontal beams (no text or symbols)

NEED HELP? CONTACT US!

Have product questions? Need technical support? Please feel free to contact us:

Technical Support and E-Warranty Certificate www.vevor.com/support

This is the original instruction, please read all manual instructions carefully before operating. VEVOR reserves a clear interpretation of o user manual. The appearance of the product shall be subject to the product you received. Please forgive us that we won't inform you ag there are any technology or software updates on our product.

Vevor BJJ-TB8510 - NEED HELP? CONTACT US! - 1

WARNING:

Please read this manual carefully before using the product. Failure do so may result in serious injury.

ASSEMBLY PRECAUTIONS

  1. Assemble only according to these instructions. Improper assembly c create hazards.
  2. Wear ANSI-approved safety goggles and heavy-duty work gloves during assembly.
  3. Keep the assembly area clean and well-lit.
  4. Keep bystanders out of the area during assembly.
  5. Do not assemble when tired or when under the influence of alcohol drugs or medication.
  6. The product capabilities apply to properly and completely assembled products only.
  7. Assemble on a flat, level, hard and smooth surface capable of sa supporting the Backdrop Stand.
  8. For additional information regarding the parts listed in the following pages, please refer to the Assembly Diagram of this manual. Unwrap separate all parts in a clean work area.

SAVE THESE INSTRUCTIONS

USE PRECAUTIONS

TO PREVENT SERIOUS INJURY AND DEATH FROM TIPPING:

  1. This product is not a toy. Do not allow children to play with or item.
  2. Do not exceed weight capacities, before moving.
  3. Use only on a flat, hard and smooth surface capable of safely supporting a fully loaded Backdrop Stand.
  4. Use as intended only.
  5. Inspect before every use; do not use if parts are loose or damage

TECHNICAL SPECIFICATIONS

ModelBJJ-TB8510
Product Dimensions (LxWxH)(mm)3200*325*2600
Net Weight(kg)About 5.06

*Products such as specifications, appearance, and design are subject to modification without prior notice.

PACKAGE CONTENTS

AVevor BJJ-TB8510 - PACKAGE CONTENTS - 12FVevor BJJ-TB8510 - PACKAGE CONTENTS - 22
BVevor BJJ-TB8510 - PACKAGE CONTENTS - 31GVevor BJJ-TB8510 - PACKAGE CONTENTS - 44
CVevor BJJ-TB8510 - PACKAGE CONTENTS - 51HVevor BJJ-TB8510 - PACKAGE CONTENTS - 62
DVevor BJJ-TB8510 - PACKAGE CONTENTS - 71IVevor BJJ-TB8510 - PACKAGE CONTENTS - 82
EVevor BJJ-TB8510 - PACKAGE CONTENTS - 91

ASSEMBLY STEPS

STEP 1
Vevor BJJ-TB8510 - ASSEMBLY STEPS - 1

text_image B*1 C*1 D*1 B C D

Take one piece of B, one pieces of C and one piece of D, and connect them in the order shown in the figure.

STEP 2
Vevor BJJ-TB8510 - ASSEMBLY STEPS - 2

flowchart
graph TD
    A["Start"] --> B{Condition}
    B -->|Yes| C["Process Step 1"]
    B -->|No| D["Process Step 2"]
    C --> E["End"]
    D --> F["End"]

Take material E and material F (telescopic rod), connect them two times, a total of two groups, and screw out the claw screw at the top.

Vevor BJJ-TB8510 - ASSEMBLY STEPS - 3

text_image STEP 3 A I

Take material A and material I (screws) and connect them with the vertical rod in step 2 as shown in the figure.

Vevor BJJ-TB8510 - ASSEMBLY STEPS - 4

text_image STEP 4

After placing the vertical rod assembled in step 3 at a proper distance, two people install the horizontal rod assembled in step 1 and tighten the claw screws.

STEP 5
Vevor BJJ-TB8510 - ASSEMBLY STEPS - 5

text_image Tighten the claw screw Tighten the claw screw Tips: After the shelf is stretched, make sure that the upper and lower distances are the same. It is best to measure it if you have a tape measure at home. If you don't have a tape measure, another person should stand at a distance and look at the upper and lower distances. Otherwise, the shelf will be unstable.

Two people will raise the tripod to a suitable height to ensure that the height of both sides is consistent and the crossbar is horizontal.

STEP 6
Vevor BJJ-TB8510 - ASSEMBLY STEPS - 6

text_image G*4 F*2 Installation position of sandbag Installation position of sandbag

2 sandbags, placed as shown in the figure after loading sand, to ensure the stability of the shelf; Four cloth clips are used according to the actual situation.

COMPLETION

Vevor BJJ-TB8510 - COMPLETION - 1

natural_image Pure structural frame diagram with vertical and horizontal lines, no text or symbols present

Manufacturer: Shanghaimuxinmuyeyouxiangongsi

Address: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.

Imported to AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australia

Imported to USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730

UKREP

YH CONSULTING LIMITED. C/O YH Consulting

Limited Office 147, Centurion House, London

Road, Staines-upon-Thames, Surrey, TW18 4AX

ECREP

E-CrossStu GmbH

Mainzer Landstr.69,

60329 Frankfurt am Main.

VEVOR®

TOUGH TOOLS, HALF PRICE

Technical Support and E-Warranty Certificate

www.vevor.com/support

VEVOR®

TOUGH TOOLS, HALF PRICE

natural_image Pure structural frame diagram with vertical supports and horizontal beams (no text or symbols)

BESOIN D'AIDE? CONTACTEZ-NOUS!

Take one piece of B, one pieces of C and one piece of D, and connect them in the order shown in the figure.

STEP 2
Vevor BJJ-TB8510 - BESOIN D'AIDE? CONTACTEZ-NOUS! - 1

flowchart
graph TD
    A["Start"] --> B["E"]
    B --> C["+"]
    C --> D["-"]
    D --> E["F"]
    E --> F["End"]
    G["Start"] --> H["+"]
    H --> I["+"]
    I --> J["End"]

Take material E and material F (telescopic rod), connect them two times, a total of two groups, and screw out the claw screw at the top.

STEP 3
Vevor BJJ-TB8510 - BESOIN D'AIDE? CONTACTEZ-NOUS! - 2

natural_image Pure electrical circuit lines without any symbols

Take material A and material I (screws) and connect them with the vertical rod in step 2 as shown in the figure.

STEP 4
Vevor BJJ-TB8510 - BESOIN D'AIDE? CONTACTEZ-NOUS! - 3

natural_image Pure structural diagram of a frame with vertical supports and base plates, no text or symbols present

After placing the vertical rod assembled in step 3 at a proper distance, two people install the horizontal rod assembled in step 1 and tighten the claw screws.

STEP 5
Vevor BJJ-TB8510 - BESOIN D'AIDE? CONTACTEZ-NOUS! - 4

text_image Tighten the claw screw Tighten the claw screw Tips: After the shelf is stretched, make sure that the upper and lower distances are the same. It is best to measure it if you have a tape measure at home. If you don't have a tape measure, another person should stand at a distance and look at the upper and lower distances. Otherwise, the shelf will be unstable.

Two people will raise the tripod to a suitable height to ensure that the height of both sides is consistent and the crossbar is horizontal.

STEP 6
Vevor BJJ-TB8510 - BESOIN D'AIDE? CONTACTEZ-NOUS! - 5

text_image G*4 F*2 Installation position of sandbag Installation position of sandbag

2 sandbags, placed as shown in the figure after loading sand, to ensure the stability of the shelf; Four cloth clips are used according to the actual situation.

ACHÈVEMENT

Vevor BJJ-TB8510 - ACHÈVEMENT - 1

natural_image Pure structural frame diagram with vertical and horizontal lines, no text or symbols present

Fabricant : Shanghaimuxinmuyeyouxiangongsi Adresse :

Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.

Importé en Australie : SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australie

YH CONSULTING LIMITED. C/O YH Consulting

Limited Bureau 147, Centurion House, London

Road, Staines-upon-Thames, Surrey, TW18 4AX

Vevor BJJ-TB8510 - ACHÈVEMENT - 2

text_image REPRÉSENTANT DE LA CE

E-CrossStu GmbH

Mainzer Landstr.69,

www.vevor.com/support

HINTERGRUNDSTÄNDER

BENUTZERHANDBUCH

MODELL NR.: BJJ-TB8510

natural_image Pure structural frame diagram with vertical supports and horizontal beams (no text or symbols)

Take one piece of B, one pieces of C and one piece of D, and connect them in the order shown in the figure.

STEP 2
Vevor BJJ-TB8510 - MODELL NR.: BJJ-TB8510 - 1

flowchart
graph TD
    A["Start"] --> B["E"]
    B --> C["+"]
    C --> D["-"]
    D --> E["F"]
    E --> F["End"]
    G["Start"] --> H["+"]
    H --> I["+"]
    I --> J["End"]

Take material E and material F (telescopic rod), connect them two times, a total of two groups, and screw out the claw screw at the top.

Vevor BJJ-TB8510 - MODELL NR.: BJJ-TB8510 - 2

text_image STEP 3 A I

Take material A and material I (screws) and connect them with the vertical rod in step 2 as shown in the figure.

Vevor BJJ-TB8510 - MODELL NR.: BJJ-TB8510 - 3

text_image STEP 4

After placing the vertical rod assembled in step 3 at a proper distance, two people install the horizontal rod assembled in step 1 and tighten the claw screws.

STEP 5
Vevor BJJ-TB8510 - MODELL NR.: BJJ-TB8510 - 4

text_image Tighten the claw screw Tighten the claw screw Tips: After the shelf is stretched, make sure that the upper and lower distances are the same. It is best to measure it if you have a tape measure at home. If you don't have a tape measure, another person should stand at a distance and look at the upper and lower distances. Otherwise, the shelf will be unstable.

Two people will raise the tripod to a suitable height to ensure that the height of both sides is consistent and the crossbar is horizontal.

STEP 6
Vevor BJJ-TB8510 - MODELL NR.: BJJ-TB8510 - 5

text_image G*4 F*2 Installation position of sandbag Installation position of sandbag

2 sandbags, placed as shown in the figure after loading sand, to ensure the stability of the shelf; Four cloth clips are used according to the actual situation.

FERTIGSTELLUNG

Vevor BJJ-TB8510 - FERTIGSTELLUNG - 1

natural_image Pure structural frame diagram with vertical and horizontal lines, no text or symbols present

Hersteller: Shanghaimuxinmuyeyouxiangongsi Adresse:

Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, Shanghai 200000 CN.

Nach AUS importiert: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australien

Importiert in die USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730

Vevor BJJ-TB8510 - FERTIGSTELLUNG - 2

text_image UK REP

YH CONSULTING LIMITED. C/O YH Consulting

Limited Office 147, Centurion House, London

Road, Staines-upon-Thames, Surrey, TW18 4AX

Vevor BJJ-TB8510 - FERTIGSTELLUNG - 3

www.vevor.com/support

VEVOR®

TOUGH TOOLS, HALF PRICE

www.vevor.com/support

SUPPORTO PER FONDALE

MANUALE D'USO

MODELLO NUMERO: BJJ-TB8510

natural_image Pure structural frame diagram with vertical supports and horizontal beams (no text or symbols)

www.vevor.com/support

Take one piece of B, one pieces of C and one piece of D, and connect them in the order shown in the figure.

STEP 2
Vevor BJJ-TB8510 - MANUALE D'USO - 1

flowchart
graph TD
    A["Start"] --> B["E"]
    B --> C["+"]
    C --> D["-"]
    D --> E["F"]
    E --> F["End"]
    G["Start"] --> H["+"]
    H --> I["+"]
    I --> J["End"]

Take material E and material F (telescopic rod), connect them two times, a total of two groups, and screw out the claw screw at the top.

Vevor BJJ-TB8510 - MANUALE D'USO - 2

text_image STEP 3 A I

Take material A and material I (screws) and connect them with the vertical rod in step 2 as shown in the figure.

Vevor BJJ-TB8510 - MANUALE D'USO - 3

text_image STEP 4

After placing the vertical rod assembled in step 3 at a proper distance, two people install the horizontal rod assembled in step 1 and tighten the claw screws.

STEP 5
Vevor BJJ-TB8510 - MANUALE D'USO - 4

text_image Tighten the claw screw Tighten the claw screw Tips: After the shelf is stretched, make sure that the upper and lower distances are the same. It is best to measure it if you have a tape measure at home. If you don't have a tape measure, another person should stand at a distance and look at the upper and lower distances. Otherwise, the shelf will be unstable.

Two people will raise the tripod to a suitable height to ensure that the height of both sides is consistent and the crossbar is horizontal.

STEP 6
Vevor BJJ-TB8510 - MANUALE D'USO - 5

text_image G*4 F*2 Installation position of sandbag Installation position of sandbag

2 sandbags, placed as shown in the figure after loading sand, to ensure the stability of the shelf; Four cloth clips are used according to the actual situation.

COMPLETAMENTO

Vevor BJJ-TB8510 - COMPLETAMENTO - 1

natural_image Pure structural frame diagram with vertical and horizontal lines, no text or symbols present

Importato in AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australia

Importato negli USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730

Vevor BJJ-TB8510 - COMPLETAMENTO - 2

text_image RAPPRESENTANZA DEL REGNO UNITO

YH CONSULTING LIMITED. C/O YH Consulting

Limited Ufficio 147, Centurion House, London

Road, Staines-upon-Thames, Surrey, TW18 4AX

Vevor BJJ-TB8510 - COMPLETAMENTO - 3

www.vevor.com/support

SOPORTE DE FONDO

MANUAL DEL USUARIO

N.° DE MODELO: BJJ-TB8510

natural_image Pure structural frame diagram with vertical and horizontal lines, no text or symbols present

Take one piece of B, one pieces of C and one piece of D, and connect them in the order shown in the figure.

STEP 2
Vevor BJJ-TB8510 - COMPLETAMENTO - 4

flowchart
graph TD
    A["Start"] --> B["E"]
    B --> C["+"]
    C --> D["-"]
    D --> E["F"]
    E --> F["End"]
    G["Start"] --> H["+"]
    H --> I["+"]
    I --> J["End"]

Take material E and material F (telescopic rod), connect them two times, a total of two groups, and screw out the claw screw at the top.

Vevor BJJ-TB8510 - COMPLETAMENTO - 5

text_image STEP 3 A

Take material A and material I (screws) and connect them with the vertical rod in step 2 as shown in the figure.

Vevor BJJ-TB8510 - COMPLETAMENTO - 6

text_image STEP 4

After placing the vertical rod assembled in step 3 at a proper distance, two people install the horizontal rod assembled in step 1 and tighten the claw screws.

STEP 5
Vevor BJJ-TB8510 - COMPLETAMENTO - 7

text_image Tighten the claw screw Tighten the claw screw Tips: After the shelf is stretched, make sure that the upper and lower distances are the same. It is best to measure it if you have a tape measure at home. If you don't have a tape measure, another person should stand at a distance and look at the upper and lower distances. Otherwise, the shelf will be unstable.

Two people will raise the tripod to a suitable height to ensure that the height of both sides is consistent and the crossbar is horizontal.

STEP 6
Vevor BJJ-TB8510 - COMPLETAMENTO - 8

text_image G*4 F*2 Installation position of sandbag Installation position of sandbag

2 sandbags, placed as shown in the figure after loading sand, to ensure the stability of the shelf; Four cloth clips are used according to the actual situation.

TERMINACIÓN

Vevor BJJ-TB8510 - TERMINACIÓN - 1

natural_image Pure structural frame diagram with vertical and horizontal lines, no text or symbols present

Road, Staines-upon-Thames, Surrey, TW18 4AX

Vevor BJJ-TB8510 - TERMINACIÓN - 2

text_image REPRESENTANTE CE

E-CrossStu GmbH

natural_image Pure structural frame diagram with vertical and horizontal lines, no text or symbols present

POTRZEBUJESZ POMOCY? SKONTAKTUJ SIĘ Z NAMI!

Take one piece of B, one pieces of C and one piece of D, and connect them in the order shown in the figure.

STEP 2
Vevor BJJ-TB8510 - TERMINACIÓN - 3

flowchart
graph TD
    A["Start"] --> B["E"]
    B --> C["+"]
    C --> D["-"]
    D --> E["F"]
    E --> F["End"]
    G["Start"] --> H["+"]
    H --> I["+"]
    I --> J["End"]

Take material E and material F (telescopic rod), connect them two times, a total of two groups, and screw out the claw screw at the top.

Vevor BJJ-TB8510 - TERMINACIÓN - 4

text_image STEP 3 A

Take material A and material I (screws) and connect them with the vertical rod in step 2 as shown in the figure.

Vevor BJJ-TB8510 - TERMINACIÓN - 5

text_image STEP 4

After placing the vertical rod assembled in step 3 at a proper distance, two people install the horizontal rod assembled in step 1 and tighten the claw screws.

STEP 5
Vevor BJJ-TB8510 - TERMINACIÓN - 6

text_image Tighten the claw screw Tighten the claw screw Tips: After the shelf is stretched, make sure that the upper and lower distances are the same. It is best to measure it if you have a tape measure at home. If you don't have a tape measure, another person should stand at a distance and look at the upper and lower distances. Otherwise, the shelf will be unstable.

Two people will raise the tripod to a suitable height to ensure that the height of both sides is consistent and the crossbar is horizontal.

STEP 6
Vevor BJJ-TB8510 - TERMINACIÓN - 7

text_image G*4 F*2 Installation position of sandbag Installation position of sandbag

2 sandbags, placed as shown in the figure after loading sand, to ensure the stability of the shelf; Four cloth clips are used according to the actual situation.

UKOŃCZENIE

Vevor BJJ-TB8510 - UKOŃCZENIE - 1

natural_image Pure structural frame diagram with vertical and horizontal lines, no text or symbols present

Producent: Shanghaimuxinmuyeyouxiangongsi Adres:

Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, szanghaj 200000 CN.

Importowane do AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australia

Importowane do USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730

REP WIEL KIEJ BRYTANII

YH CONSULTING LIMITED. C/O YH Consulting Limited Biuro 147, Centurion House, London Road, Staines- upon-Thames, Surrey, TW18 4AX

Przedstaw ciel UE

E-CrossStu GmbH

Mainzer Landstr.69,

60329 Frankfurt nad Menem.

VEVOR®

TOUGH TOOLS, HALF PRICE

www.vevor.com/support

ACHTERGRONDSTANDAARD

GEBRUIKERSHANDLEIDING

MODELNUMMER: BJJ-TB8510

natural_image Pure structural frame diagram with vertical and horizontal lines, no text or symbols present

HULP NODIG? NEEM CONTACT MET ONS OP!

Take one piece of B, one pieces of C and one piece of D, and connect them in the order shown in the figure.

STEP 2
Vevor BJJ-TB8510 - HULP NODIG? NEEM CONTACT MET ONS OP! - 1

flowchart
graph TD
    A["Start"] --> B["E"]
    B --> C["+"]
    C --> D["-"]
    D --> E["F"]
    E --> F["End"]
    G["Start"] --> H["+"]
    H --> I["+"]
    I --> J["End"]

Take material E and material F (telescopic rod), connect them two times, a total of two groups, and screw out the claw screw at the top.

Vevor BJJ-TB8510 - HULP NODIG? NEEM CONTACT MET ONS OP! - 2

text_image STEP 3 A

Take material A and material I (screws) and connect them with the vertical rod in step 2 as shown in the figure.

Vevor BJJ-TB8510 - HULP NODIG? NEEM CONTACT MET ONS OP! - 3

text_image STEP 4

After placing the vertical rod assembled in step 3 at a proper distance, two people install the horizontal rod assembled in step 1 and tighten the claw screws.

STEP 5
Vevor BJJ-TB8510 - HULP NODIG? NEEM CONTACT MET ONS OP! - 4

text_image Tighten the claw screw Tighten the claw screw Tips: After the shelf is stretched, make sure that the upper and lower distances are the same. It is best to measure it if you have a tape measure at home. If you don't have a tape measure, another person should stand at a distance and look at the upper and lower distances. Otherwise, the shelf will be unstable.

Two people will raise the tripod to a suitable height to ensure that the height of both sides is consistent and the crossbar is horizontal.

STEP 6
Vevor BJJ-TB8510 - HULP NODIG? NEEM CONTACT MET ONS OP! - 5

text_image G*4 F*2 Installation position of sandbag Installation position of sandbag

2 sandbags, placed as shown in the figure after loading sand, to ensure the stability of the shelf; Four cloth clips are used according to the actual situation.

VOLTOOING

Vevor BJJ-TB8510 - VOLTOOING - 1

natural_image Pure structural frame diagram with vertical and horizontal lines, no text or symbols present

Fabrikant: Shanghaimuxinmuyeyouxiangongsi Adres:

Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.

YH CONSULTING LIMITED. C/O YH Consulting

Limited Kantoor 147, Centurion House, London

Road, Staines-upon-Thames, Surrey, TW18 4AX

Vevor BJJ-TB8510 - VOLTOOING - 2

text_image EC-REP

E-CrossStu GmbH

Mainzer Landstr.69,

garantiecertificaat www.vevor.com/support

VEVOR®

TOUGH TOOLS, HALF PRICE

www.vevor.com/support

BAKGRUNDSTÄLL

ANVÄNDARMANUAL

MODELLNR: BJJ-TB8510

natural_image Pure structural frame diagram with vertical and horizontal lines, no text or symbols present

BEHÖVER HJÄLP? KONTAKTA OSS!

Take one piece of B, one pieces of C and one piece of D, and connect them in the order shown in the figure.

STEP 2
Vevor BJJ-TB8510 - BEHÖVER HJÄLP? KONTAKTA OSS! - 1

flowchart
graph TD
    A["Start"] --> B["E"]
    B --> C["+"]
    C --> D["-"]
    D --> E["F"]
    E --> F["End"]
    G["Start"] --> H["+"]
    H --> I["+"]
    I --> J["End"]

Take material E and material F (telescopic rod), connect them two times, a total of two groups, and screw out the claw screw at the top.

Vevor BJJ-TB8510 - BEHÖVER HJÄLP? KONTAKTA OSS! - 2

text_image STEP 3 A

Take material A and material I (screws) and connect them with the vertical rod in step 2 as shown in the figure.

Vevor BJJ-TB8510 - BEHÖVER HJÄLP? KONTAKTA OSS! - 3

text_image STEP 4

After placing the vertical rod assembled in step 3 at a proper distance, two people install the horizontal rod assembled in step 1 and tighten the claw screws.

STEP 5
Vevor BJJ-TB8510 - BEHÖVER HJÄLP? KONTAKTA OSS! - 4

text_image Tighten the claw screw Tighten the claw screw Tips: After the shelf is stretched, make sure that the upper and lower distances are the same. It is best to measure it if you have a tape measure at home. If you don't have a tape measure, another person should stand at a distance and look at the upper and lower distances. Otherwise, the shelf will be unstable.

Two people will raise the tripod to a suitable height to ensure that the height of both sides is consistent and the crossbar is horizontal.

STEP 6
Vevor BJJ-TB8510 - BEHÖVER HJÄLP? KONTAKTA OSS! - 5

text_image G*4 F*2 Installation position of sandbag Installation position of sandbag

2 sandbags, placed as shown in the figure after loading sand, to ensure the stability of the shelf; Four cloth clips are used according to the actual situation.

KOMPLETTERING

Vevor BJJ-TB8510 - KOMPLETTERING - 1

natural_image Pure structural frame diagram with vertical and horizontal lines, no text or symbols present

Tillverkare: Shanghaimuxinmuyeyouxiangongsi Adress:

Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.

Importerad till AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australien

Importerad till USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730

UKREP

YH CONSULTING LIMITED. C/O YH Consulting

Limited Office 147, Centurion House, London

Road, Staines-upon-Thames, Surrey, TW18 4AX

ECREP

E-CrossStu GmbH

Mainzer Landstr.69,

60329 Frankfurt am Main.

VEVOR®

TOUGH TOOLS, HALF PRICE

www.vevor.com/support

Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : Vevor

Model : BJJ-TB8510

Category : Wall mount