USER MANUAL EVM112 IFM
Installation instruction
ecolink / ecolink fast connect

ecolink connector


Fig. 1: ecolink connector installation
▶ Connect the connector with the device (A).
▶ When doing so, ensure that the coding is positioned correctly.
For M12 connectors, the arrow indicates the position of the keyway (a).
▶ Tighten the coupling nut by hand to ensure the specified protection rating (B).
(Optional) For use in harsh environments and with increased shock and vibration resistance:
▶ Tighten the coupling nut one notch further using a spanner. When doing so, do not exceed the maximum tightening torque (→ data sheet) of the counterpart.


Fig. 2: Demounting of the ecolink connector
▶ Press the connector against the unit and simultaneously loosen the coupling nut (A).
▶ Disconnect the connector from the device (B).
ecolink fast connect

ATTENTION
Only use connectors with threaded sleeves.
▷ Using unsuitable connectors may damage the terminals.



Fig. 3: ecolink Fast Connect installation
▶ Do not use unsuitable connectors (A).
▶ Press the threaded sleeve of the connector into the device (B).
▶ Push past the spring resistance until the end position is reached (C).


Fig. 4: Demouting of the ecolink fast connect
▶ Press the connector against the unit and simultaneously loosen the coupling nut (A).
▶ Disconnect the connector from the device (B).