Product Type Server
Brand D-Link
Model DSN-6420
Form Factor 2U Rackmount
Dimensions (H x W x D) 88.9 x 482.6 x 650 mm
Weight Approx. 12 kg
Power Supply 300W Redundant
Supported Drive Bays 12 x 3.5" SATA/SAS
RAID Support RAID 0, 1, 5, 6, 10, 50, 60
Network Interfaces 2 x Gigabit Ethernet
Processor Intel Xeon E3-1200 v5
Memory 16 GB DDR4 ECC (up to 64 GB)
Operating System D-Link Storage Manager
Cooling Dual hot-swap fans
Maintenance Clean air vents with compressed air; check fan operation monthly
Safety Mount securely in rack; ensure proper grounding; avoid blocking ventilation
Spare Parts & Repairability Hot-swap drives, power supply, and fans; replaceable memory modules
General Information Enterprise-grade storage server for data consolidation and backup

Frequently Asked Questions - DSN-6420 D-LINK

What is the default IP address to access the DSN-6420 management interface?
The default IP address is typically 192.168.0.1. Check the sticker on the device or the manual for confirmation.
How many hard drives does the DSN-6420 support?
It supports up to 12 3.5-inch SATA or SAS hard drives in the front bays.
Does the DSN-6420 support RAID 5?
Yes, it supports RAID levels including 0, 1, 5, 6, 10, 50, and 60.
Can I upgrade the memory on the DSN-6420?
Yes, the server has four DDR4 ECC memory slots. The standard configuration is 16 GB, but you can upgrade to a maximum of 64 GB.
How do I reset the DSN-6420 to factory default settings?
Press and hold the reset button on the rear panel for 10 seconds using a paperclip. The device will reboot with factory defaults.
What type of power supply does the DSN-6420 use?
It uses a 300W redundant power supply with hot-swap capability.
Is the DSN-6420 compatible with 2.5-inch drives?
Yes, you can use 2.5-inch drives in the 3.5-inch bays with an adapter bracket.
How can I expand storage beyond 12 drives?
You can connect optional expansion enclosures (e.g., D-Link DSN-8200) via the SAS ports on the back.
What is the warranty period for the DSN-6420?
D-Link typically offers a 3-year limited hardware warranty. Check with your reseller for specifics.
Can I install a third-party operating system like FreeNAS?
While the DSN-6420 is designed to work with D-Link Storage Manager, you can install other OS if it supports the hardware. However, driver support may be limited.

User questions about DSN-6420 D-LINK

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Server in PDF format for free! Find your manual DSN-6420 - D-LINK and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. DSN-6420 by D-LINK.

USER MANUAL DSN-6420 D-LINK

Building Networks for People

Quick Installation Guide DSN-6000 series

iSCSI IP SAN storage

Package Contents

If any of the items are missing, please contact your reseller.

D-LINK DSN-6420 - Package Contents - 1

natural_image Front view of a black server rack unit (no visible text or labels)

IP SAN storage HDD trays

D-LINK DSN-6420 - Package Contents - 2

natural_image Exterior view of a beige hard drive (no visible text or symbols)

ys

D-LINK DSN-6420 - Package Contents - 3

natural_image Two black cables with connectors, no visible text or symbols

Power cords

D-LINK DSN-6420 - Package Contents - 4

natural_image Two black cables with connectors, one open and one closed, shown against a plain background (no text or symbols visible)

RS-232 cables

D-LINK DSN-6420 - Package Contents - 5

natural_image Pure electrical circuit lines without any symbols

and cable for DSN-6410/ 6420 only

eBook Storage D-Link® Business Data Marketing

CD Keys, screws for

D-LINK DSN-6420 - Package Contents - 7

natural_image Metallic rectangular metal strips with no visible text or markings

Rail kitGBIC transceiver

D-LINK DSN-6420 - Package Contents - 8

natural_image Collection of mechanical parts including bolts, keys, and a chain (no text or symbols visible)

drives and rail kit

Before installation

Before starting, prepare the following items.

  1. A host with a Gigabit Ethernet NIC or iSCSI HBA.
  2. CAT 5e, or CAT 6 network cables for management port and iSCSI data ports.
  3. Prepare storage system configuration plan.
  4. Prepare management port and iSCSI data ports network information. When using static IP, please prepare static IP addresses, subnet mask, and default gateway.
  5. 10GbE switches (recommended). Or 10GbE switches with LCAP / Trunking (optional).
  6. CHAP security information, including CHAP username and secret (optional).

Install drives

Note: Skip this section if you purchased a solution populated with drives.

To install SAS or SATA drives with no Bridge Board use the front mounting holes:

D-LINK DSN-6420 - Install drives - 1

natural_image Close-up of a hard disk drive with visible internal components and mounting bracket (no text or symbols)

To install SATA drives with Bridge Board (DSN-654), fit the Bridge Board first.

D-LINK DSN-6420 - Install drives - 2

natural_image Exterior view of a hard disk drive housing (no visible text or labels)

Then install the drive using the rear mounting holes:

D-LINK DSN-6420 - Install drives - 3

natural_image Internal view of a hard disk drive with visible mounting bracket and drive casing (no text or symbols)

Drive slot numbering

Slot 1 Slot 4 Slot 7Slot 10
Slot 2 Slot 5 Slot 8Slot 11
Slot 3 Slot 6 Slot 9Slot 12

Hard drives can be installed into any slot in the enclosure. Slot numbering will be reflected in web UI.

Note: It is advisable to install at least one drive in slots 1 \~ 4. System event logs are saved to drives in these slots; If no drives are fitted the event logs will be lost in the event of a system reboot.

Deployment

Please refer to the following topology and have all the connections ready.

  1. Setup the hardware connection before powering on servers. Connect console cable, management port cable, and iSCSI data port cables in advance.
  2. In addition, installing an iSNS server is recommended for dual controller system.
  3. Power on IP SAN storage and JBOD (optional) first, and then power on hosts and iSNS server.
  4. To ensure MPIO is set-up automatically it is recommended that you log on the target twice (from controller 1 then controller 2).

Note: iSNS server is recommended for dual controller system.

DSN-6110: 1GbE to SAS/ SATA IP SAN storage, Single controller.

D-LINK DSN-6420 - Deployment - 1

flowchart
graph TD
    A["Host / Server"] -->|GBE| B["Gigabit switch"]
    C["EVS server (Recommended)"] -->|GBE| B
    D["Management PC"] -->|RS 232| E["Switch"]
    F["APC Smart UPS (Optional)"] -->|RS 232| E
    B --> G["DSN-6110 controller"]
    E --> H["BBM"]
    G --> I["Console UPS"]
    H --> J["JBOD"]
    I --> K["To DSN-6020"]
    J --> K
    style A fill:#4CAF50,stroke:#388E3C
    style C fill:#4CAF50,stroke:#388E3C
    style D fill:#4CAF50,stroke:#388E3C
    style F fill:#4CAF50,stroke:#388E3C
    style G fill:#FFA500,stroke:#388E3C
    style H fill:#FFA500,stroke:#388E3C
    style I fill:#FFA500,stroke:#388E3C
    style J fill:#FFA500,stroke:#388E3C
    style K fill:#FFA500,stroke:#388E3C

DSN-6120: 1GbE to SAS/ SATA IP SAN storage, Dual redundant controller.

D-LINK DSN-6420 - Deployment - 2

flowchart
graph TD
    A["Host / Server"] --> B["Gigabit switch"]
    C["ISNS server (Recommended)"] --> D["Switch"]
    E["Management PC"] --> F["Switch"]
    G["APC Smart UPS (Optional)"] --> H["Switch"]
    I["DSN-6120 controller 1"] --> J["Console UPS"]
    K["DSN-6120 controller 2"] --> L["Console UPS"]
    M["SAS cable"] --> N["To DSN-6020"]
    O["RJ45"] --> P["G3E G3E"]
    Q["RS 232"] --> R["G3E"]
    S["BBM"] --> T["M"]
    U["JBOD"] --> V["To DSN-6020"]
    W["RS 232"] --> X["NJC"]
    Y["4 3 2 1"] --> Z["M"]
    AA["4 3 2 1"] --> AB["M"]
    AC["4 3 2 1"] --> AD["M"]
    AE["4 3 2 1"] --> AF["M"]
    AG["4 3 2 1"] --> AH["M"]
    AI["4 3 2 1"] --> AJ["M"]
    AK["4 3 2 1"] --> AL["M"]
    AM["4 3 2 1"] --> AN["M"]
    AO["4 3 2 1"] --> AP["M"]
    AQ["4 3 2 1"] --> AR["M"]
    AS["To DSN-6020"] --> AT["To DSN-6020"]

DSN-6410: 10GbE to SAS/ SATA IP SAN storage, Single controller.

D-LINK DSN-6420 - Deployment - 3

flowchart
graph TD
    A["Host / Server"] -->|10G 10G| B["1060E switch"]
    C["ISNS server (Recommended)"] -->|10G| B
    D["Management PC"] -->|RS 232| E["Switch"]
    F["APC Smart UPS (Optional)"] -->|RS 232| E
    G["DSV-6410 controller"] --> H["1"]
    G --> I["2"]
    G --> J["M"]
    G --> K["BBM"]
    G --> L["Console UPS"]
    G --> M["J800"]
    G --> N["To DSV-6020"]
    style A fill:#f9f,stroke:#333
    style C fill:#f9f,stroke:#333
    style D fill:#f9f,stroke:#333
    style F fill:#f9f,stroke:#333
    style G fill:#ccf,stroke:#333
    style H fill:#cff,stroke:#333
    style I fill:#cff,stroke:#333
    style J fill:#cff,stroke:#333
    style K fill:#cff,stroke:#333
    style L fill:#cff,stroke:#333
    style M fill:#cff,stroke:#333
    style N fill:#ffc,stroke:#333

DSN-6420: 10GbE to SAS/ SATA IP SAN storage, Dual redundant controller.

D-LINK DSN-6420 - Deployment - 4

flowchart
graph TD
    A["DSN-6420 controller 1"] -->|1| B["1"]
    A -->|2| C["2"]
    D["DSN-6420 controller 2"] -->|1| E["1"]
    D -->|2| F["2"]
    G["DSN-6420 controller 1"] -->|M| H["M"]
    I["DSN-6420 controller 2"] -->|M| J["M"]
    K["DSN-6420 controller 1"] -->|Console| L["UPS"]
    M["DSN-6420 controller 2"] -->|Console| N["UPS"]
    O["DSN-6420 controller 1"] --> P["JBOD"]
    Q["DSN-6420 controller 2"] --> R["JBOD"]
    S["DSN-6420 controller 1"] --> T["10GbE switch"]
    U["DSN-6420 controller 2"] --> V["10GbE switch"]
    W["DSN-6420 controller 1"] --> X["10G"]
    Y["DSN-6420 controller 2"] --> Z["10G"]
    AA["DSN-6420 controller 1"] --> AB["10G"]
    AC["DSN-6420 controller 2"] --> AD["10G"]
    AE["DSN-6420 controller 1"] --> AF["10G"]
    AG["DSN-6420 controller 2"] --> AH["10G"]
    AI["DSN-6420 controller 1"] --> AJ["10G"]
    AK["DSN-6420 controller 2"] --> AL["10G"]
    AM["DSN-6420 controller 1"] --> AN["10G"]
    AO["DSN-6420 controller 2"] --> AP["10G"]
    AQ["DSN-6420 controller 1"] --> AR["10G"]
    AS["DSN-6420 controller 2"] --> AT["10G"]
    AU["DSN-6420 controller 1"] --> AV["10G"]
    AW["DSN-6420 controller 2"] --> AX["10G"]
    AY["DSN-6420 controller 1"] --> AZ["M"]
    BA["DSN-6420 controller 2"] --> BB["M"]
    BC["DSN-6420 controller 1"] --> BD["M"]
    BE["DSN-6420 controller 2"] --> BF["M"]
    BG["DSN-6420 controller 1"] --> BH["M"]
    BI["DSN-6420 controller 2"] --> BJ["M"]
    BK["DSN-6420 controller 1"] --> BL["M"]
    BM["DSN-6420 controller 2"] --> BN["M"]
    BO["DSN-6420 controller 1"] --> BP["M"]
    BZ["DSN-6420 controller 2"] --> CA["M"]
    CB["DSN-6420 controller 1"] --> CD["M"]
    CE["DSN-6420 controller 2"] --> CF["M"]
    GD["DSN-6420 controller 1"] --> DH["M"]
    DI["DSN-6420 controller 2"] --> DJ["M"]
    DK["DSN-6420 controller 1"] --> DL["M"]
    DM["DSN-6420 controller 2"] --> DE["M"]
    FD["DSN-6420 controller 1"] --> DF["M"]
    DG["DSN-6420 controller 2"] --> DG["M"]
    BEQ["SAS cable"] --> BQ
    BEF["FC cable / CX4 cable"] --> BQ
    BEQ --> BQ
    BQ --> BQ

Configuration

1.Web UI

The D-Link DSN-6000 family includes a simple to use Graphical User Interface (GUI) for integration and management. Be sure to connect the LAN cable, open a browser and enter:

http://192.168.0.32

A dialog box for authentication will pop up.

Welcome to DSN-6000 User name admin Password ****** English Login

User name: admin

Default password: 123456

After login, choose the functions that list on the left hand side to start your configuration.

2. Quick installation

Please make sure that there are some free drives installed in this system. Please check the hard drive details in "/Volume configuration / Physical disk".

Physical disk Show PD for: - Linear Show size unit to: 100 Bit Size(0) PD Status Health Usage Vendor Total Type Write cache Density Paclahed Command opening 1 495 Online Good Free Disk SEAGATE KDMH2VYW0005N1M2U SAS Enabled Disabled Enabled Enabled 2 495 Online Good Free Disk SEAGATE KDMH0LW0005N4I5RN SAS Enabled Disabled Enabled Enabled 3 495 Online Good Free Disk SEAGATE KDMH2OPW0005N4I9SO SAS Enabled Disabled Enabled Enabled 4 495 Online Good Free Disk SEAGATE KDMH2APW0005N4I3N SAS Enabled Disabled Enabled Enabled 5 495 Online Good Free Disk SEAGATE KDMH2IRW0005N4I5HT SAS Enabled Disabled Enabled Enabled 6 495 Online Good Free Disk SEAGATE KDMH2PWFW0005N4I7R SAS Enabled Disabled Enabled Enabled 7 495 Online Good Free Disk SEAGATE KDMH2QWW0005N4I8SG SAS Enabled Disabled Enabled Enabled 8 495 Online Good Free Disk SEAGATE KDMH2FZW0005N4I9FT SAS Enabled Disabled Enabled Enabled

Step1: Click the "Quick installation"; follow the steps to set up system name and date / time. Step2: Confirm the management port and DNS IP addresses are correct, and click "Next".

Quick Installation Map 1: System testing Rycles user Rycles time : 2006.07.00 Data and Time Change Data and Time Current time: 2015/03/28 15:37:14 Data words: 2006/03/28 (system, Comprehension, Work, etc.) Number data and Time metrics: Data: 2015.11/15.11/2015.11 Data: 2015.11/2015.11/2015.11 Error: Summary: Cancel Next navigation

Quick transceiver Step 2 : Network setting MAC address MAC address : 08:13:79 (00:00:00) Address P DHCP C State Address: 182106.852 Phone: 1051208.101& Email: 1051208.8.254 DNS DNS : Port HTTP port : 36 HTTP port : 463 SIP port : 36 Cancel = Back Next =

Step 1 Step 2

Step 3: Set up the data port IP and click "Next".

Step 4: Set up the RAID level and volume size and click "Next".

Quick installation Step 3 : SCSI IP address LINK: C: DHCP State Address : 100.004.2.1 Mask : 100.004.2058 Gateway : 100.004.2.254 Cancel → Back Next >

Step 3

Quick Variables Step 4 : Volume setting BAN2 level : BAN2 (100%) BAN2 (100%) BAN2 (100%) BAN2 (100%) BAN2 (100%) BAN2 (100%) BAN2 (100%) BAN2 (100%) BAN2 (100%) BAN2 (100%) BAN2 (100%) BAN2 (100%) C:\Users\Back Next

Step 4

Step 5: Check all items, and click "Finish".

Quick Settings Confire Hybrid name Cyberus instance (DSN-0003) Network setting Address: DHCP DNS HTTP port: 68, HTTP port: 443, DDR port: 22 DCSC IP address Address: 162,500.1 Phone: 290,258,276.0 Subnets: 292,168,239.4 Volume setting HKEY port: HKEY B actual network Volume port (GB): 2724 Cancel +/- Back Cancel

Step 5

Step 6: Done.

3.Logon Microsoft iSCSI initiator

Here are the step by step instructions to setup Microsoft iSCSI Initiator. Please visit Microsoft website for latest iSCSI initiator. This example is based on Microsoft Windows Server 2008 R2.

Connect

  1. Run Microsoft iSCSI Initiator.
    2.Input IP address or DNS name of the target. And then click "Quick Connect".

BCSI Initiator Properties Targets | Discovery | Favorite Targets | Volumes and Devices | BIOSI | Configuration | Quick Connect: To discover and log onto a target using a basic connection, type the IP address or DNS name of the target and then click Quick Connect. Target: 192.168.1.1 Quick Connect... Recovered targets Refresh Name Status To connect using advanced options, select a target and then Dick Connect. To completely disconnect a target, select the target and then click Disconnect. For target properties, including configuration of sessions, select the target and Dick Properties. For configuration of devices associated with a target, select the target and then click Devices. More about base BCSI connectors and targets OK Cancel Help

3.Click "Done".

Quick Connect Targets that are available for connection at the IP address or DNS name that you provided are listed below. If multiple targets are available, you need to connect to each target individually. Connections made here will be added to the list of Favorite Targets and an attempt to restore them will be made every time this computer restarts. Discovered targets Name Status on: 1986-05.com (linkden: 4000-7780a78.deu.crt1) Connected Progress report Immediate Login Succeeded Persistent Login failed, target will not be available after system reboot Connect Done

IEEE Initiator Properties Targets | Discovery | Favorite Targets | Volumes and Devices | RADIUS | Configuration | Quick Connect: To discover and log on to a target using a base connection, type the IP address or DNS name of the target and then click Quick Connect. Target: 1 Refresh Discovered targets Name Value Status log: 1566-06.com /d-link/dsn-4000-FTN0a29b.dtnv.0.cfr 1 Directive To connect using advanced options, select a target and then click Connect. To completely disconnect a target, select the target and then click Disconnect. For target properties, including configuration of sessions, select the target and click Properties. For configuration of devices associated with a target, select the target and then click Devices. Connect Disconnect Properties... Devices... More about basic IEEE connections and targets OK Cancel Apply

  1. Your Computer can now connect to an iSCSI disk.

TECHNICAL SUPPORT

You can find software updates and user documentation on the D-Link website.

Tech Support for customers in

Australia:

Tel: 1300-766-868

24/7 Technical Support

Web: http://www.dlink.com.au

E-mail: support@dlink.com.au

India:

Tel: +91-22-27626600

Toll Free 1800-22-8998

Web: www.dlink.co.in

E-Mail: helpdesk@dlink.co.in

Singapore, Thailand, Indonesia, Malaysia, Philippines, Vietnam:

Singapore - www.dlink.com.sg

Philippines - www.dlink.com.ph

Vietnam - www.dlink.com.vn

Korea:

Tel : +82-2-2028-1810

Monday to Friday 9:00am to 6:00pm

24/7 Technical Support

Web: http://www.dlink.co.nz

E-mail: support@dlink.co.nz

South Africa and Sub Sahara Region:

Tel: +27-12-665-2165

08600 DLINK (for South Africa only)

Monday to Friday 8:30am to 9:00pm South Africa Time

Web: http://www.d-link.co.za

E-mail: support@d-link.co.za

Saudi Arabia (KSA):

Tel: +966 01 217 0008

Fax: +966 01 217 0009

Saturday to Wednesday 9.30AM to 6.30PM

Thursdays 9.30AM to 2.00 PM

E-mail: Support.sa@dlink-me.com

Plot No. S31102,

Jebel Ali Free Zone South,

P.O.Box 18224, Dubai, U.A.E.

Tel: +971-4-8809022

Fax: +971-4-8809066 / 8809069

Technical Support: +971-4-8809033

General Inquiries: info.me@dlink-me.com

Tech Support: support.me@dlink-me.com

Egypt

1, Makram Ebeid Street - City Lights Building

Nasrcity - Cairo, Egypt

Floor 6, office C2

Tel.: +2 02 26718375 - +2 02 26717280

Technical Support: +2 02 26738470

General Inquiries: info.eg@dlink-me.com

Tech Support: support.eg@dlink-me.com

Kingdom of Saudi Arabia

Office # 84

Al Khaleej Building ( Mujamathu Al-Khaleej)

Opp. King Fahd Road, Olaya

Riyadh - Saudi Arabia

Tel: +966 1 217 0008

Technical Support:

+966 1 2170009 / +966 2 6522951

General Inquiries: info.sa@dlink-me.com

Tech Support: support.sa@dlink-me.com

Pakistan

Islamabad Office:

61-A, Jinnah Avenue, Blue Area,

Suite # 11, EBC, Saudi Pak Tower,

Islamabad - Pakistan

Tel.: +92-51-2800397, 2800398

Fax: +92-51-2800399

Karachi Office:

D-147/1, KDA Scheme # 1,

Opposite Mudassir Park, Karsaz Road,

Karachi – Pakistan

Phone: +92-21-34548158, 34326649

Fax: +92-21-4375727

Technical Support: +92-21-34548310, 34305069

General Inquiries: info.pk@dlink-me.com

Tech Support: support.pk@dlink-me.com

TECHNICAL SUPPORT

Iran

Unit 5, 5th Floor, No. 20, 17th Alley, Bokharest

St., Argentine Sq.,

Tehran IRAN

Postal Code: 1513833817

Tel: +98-21-88880918,19

+98-21-88706653,54

General Inquiries: info.ir@dlink-me.com

Tech Support: support.ir@dlink-me.com

Morocco

M.I.T.C

Web:www.dlink.com.tr

Teknik Destek: support.tr@dlink.com.tr

ISRAEL

בִרְרָה לַעֹר

20

49348 n"ɔ,170n n"ɔ

7060.τ.π

073-277-11-77 :1970

Building Networks for People

natural_image Front view of a black server rack unit (no visible text or labels)
natural_image Exterior view of a beige hard drive (no visible text or symbols)
natural_image Two black cables with green connectors, no visible text or symbols

Кабели питания

D-LINK DSN-6420 - ISRAEL - 1

natural_image Two black cables with connectors, one open and one closed, against a plain background (no text or symbols visible)

Кабели RS-232

D-LINK DSN-6420 - ISRAEL - 2

natural_image Pure electrical circuit lines without any symbols
natural_image Close-up of metallic rectangular metal strips with no visible text or markings
natural_image Collection of mechanical parts including bolts, screws, and key holders (no text or symbols visible)
natural_image Close-up of a hard disk drive with visible internal components and mounting features (no text or symbols)

РУССКИЙ

natural_image Exterior view of a hard disk drive (no visible text or labels)
natural_image Internal view of a hard disk drive with mounting bracket and drive casing (no visible text or labels)

Нумерация слотов

War 1 War 2

Quick transcode Step 2 : Network setting MAC address MAC address : 06:12:79:00:00:00 Address X DHCP Y Static Address : 187.004.01.1 Host : 305.004.01.1 Subway : 305.004.01.1 DNS DNS : Port HTTP port : 36 HTTP port : 342 SSRI port : 28 Cancel = Back Next >

War 3

Quick instance Step 4 : Volume setting AXED level : AXED Level 1:000.00 AXED Level 2:000.00 AXED Level 3:000.00 AXED Level 4:000.00 AXED Level 5:000.00 AXED Level 6:000.00 AXED Level 7:000.00 AXED Level 8:000.00 Cancel == Back Next==

War 4

Data Connection Confirm System name: Solutions: 056-0003 Network setting Address: DHCP DNS HTTP port: 88, HTTPS port : A43, SNP port : 22 DSCB IP address Address: 151/00/1.1 Phone : 295/295/295/2 Address: 295/295/295/2 Volume setting NDB level: NDB B installed enclosure Institute size (MB) : $724 Cancel +/- Back Cancel

War 5

Шаг 6: Выполнено.

FCSQ Initiator Properties Targets | Discovery | Favorite Targets | Volumes and Devices | AIDUS | Configuration | Quick Connect. To discover and log on to a target using a basic connection, type the IP address or DND none of the target and then click Quick Connect. Target: 1 Click Connect Discovered targets Refresh Name Value log: 1996-06.con3-link.dsn-4000-PTN0aN48.dsn0.crt 1 Inactive To connect using advanced options, select a target and then click Connect. To completely disconnect a target, select the target and then click Disconnect. For target properties, including configuration of sessions, select the target and click Properties. For configuration of devices associated with a target, select the target and then click Devices. Connect Disconnect Properties... Devices... More about basic FCSQ connections and ramps OK Cancel Apply

Building Networks for People

natural_image Front view of a black server rack unit (no visible text or labels)
natural_image Exterior view of a hard drive (no visible text or symbols)
natural_image Two black cables with connectors, no text or symbols visible

Cable de Poder

D-LINK DSN-6420 - ISRAEL - 7

natural_image Two black cables with connectors, one open and one closed, against a plain background (no text or symbols visible)

Cables RS-232

D-LINK DSN-6420 - ISRAEL - 8

natural_image Pure electrical circuit lines without any symbols
natural_image Metallic rectangular metal strips with no visible text or markings

Kit de RielTransceiver

D-LINK DSN-6420 - ISRAEL - 9

natural_image Collection of mechanical parts including bolts, keys, and a chain (no text or symbols visible)
natural_image Close-up of a hard disk drive with visible internal components and mounting bracket (no text or symbols)
natural_image Exterior view of a hard disk drive housing (no visible text or labels)
natural_image Internal view of a hard disk drive housing with mounting bracket (no visible text or labels)

Paso 1 Paso 2

Quick instance Step 2 : Network setting MAC address MAC address : 061279.000000 Address Y DHCP F Static email : 387548-012 Host : 387548-012 Subway : 387548-012 DNS DNS : Port HTTP port : 06 HTTP port : 06 SST port : 06 Cancel → Start Next →

BCSI Initiator Properties Targets | Discovery | Preferable Targets | Volumes and Devices | RADIS | Configuration | Quick Connect To discover and log onto a target using a basic connection, type the IP address or DSS name of the target and then click Quick Connect. Target: 190.166.1.1 Quick Connect... Discovered targets Refresh Name Status To connect using advanced options, select a target and then dick Connect. To completely disconnect a target, select the target and then click Disconnect. For target properties, including configuration of sessions, select the target and tick Properties. For configuration of devices associated with a target, select the target and then click Devices. More about basic BCSI connections and targets OK Cancel Help

ICSIS Initiator Properties Targets | Discovery | Favorite Targets | Volumes and Devices | RA03.6 | Configuration | Quick Connect: To discover and log on to a target using a basic connection, type the IP address or DNO name of the target and then click Quick Connect. Target: 1 Click Connect Discovered targets Refresh Name Value ign: 1586-06.com.d-link.dsn-4000-1799aadMk.dtsv.0.crt 1 Inactive To connect using advanced options, select a target and then click Connect. To completely disconnect a target, select the target and then click Disconnect. For target properties, including configuration of sessions, select the target and click Properties. For configuration of devices associated with a target, select the target and then click Devices. Connect Disconnect Properties... Devices... More about best: ICSIS connections and targets OK Cancel Help

iSCSI IP SAN storage

包裝內容

natural_image Front view of a black server rack unit (no visible text or labels)

IP SAN storage

D-LINK DSN-6420 - 包裝內容 - 1

natural_image Exterior view of a hard drive (no visible text or symbols)

硬碟盤(硬碟為選購)

D-LINK DSN-6420 - 包裝內容 - 2

natural_image Three black cables with white connectors, arranged in a row (no text or symbols visible)

電源供應器

D-LINK DSN-6420 - 包裝內容 - 3

natural_image Two black cables with connectors, one open and one closed, against a plain background (no text or symbols visible)

RS-232線

D-LINK DSN-6420 - 包裝內容 - 4

natural_image Pure electrical circuit lines without any symbols

僅適用於DSN-6410/6420)

eBook Storage D-Link Business Data Marketing

光碟片 鑰匙,螺絲機架鎖GBIC transceiver(
D-LINK DSN-6420 - 包裝內容 - 6

natural_image Metallic rectangular metal strips with no visible text or markings

D-LINK DSN-6420 - 包裝內容 - 7

natural_image Collection of mechanical parts including bolts, screws, keys, and a looped ring (no text or symbols visible)

安裝前注意事項

安裝前,請先準備下列品項:

natural_image Close-up of a hard disk drive with visible internal components and mounting bracket (no text or symbols)

先試Bridge Board (DSN-654)再將硬碟固定安裝

D-LINK DSN-6420 - 安裝前,請先準備下列品項: - 1

natural_image Exterior view of a hard disk drive housing with visible internal components and mounting bracket (no text or symbols)

請用螺絲將硬碟固定後完成安裝

D-LINK DSN-6420 - 安裝前,請先準備下列品項: - 2

natural_image Internal view of a hard disk drive with mounting bracket and drive casing (no visible text or labels)

硬碟插槽排序

步驟 1

Quick installation Step 2 : Network setting MAC address MAC address : 0612-79.00.00.00 Address DHCP Static: 161204.01.0 DNS DNS : Port HTTP port : 36 HTTP port : 443 SSH port : 28 Cancel == Start Next >

步驟 2

步驟 3

Quick Settings Step 4: Volume setting RASS load : RASS LOAD: 1.0 RASS SET: 0.0 RASS SET: 0.0 RASS SET: 0.0 RASS SET: 0.0 RASS SET: 0.0 RASS SET: 0.0 Cancel == Start Next navigation

步驟4

步驟5

步驟 6:完成

  1. 進入 Microsoft iSCSI initiator

中文

  1. 點選 “Done”

Quick Connect Targets that are available for connection at the IP address or DNS name that you provided are listed below. If multiple targets are available, you need to connect to each target individually. Connections made here will be added to the list of Favorite Targets and an attempt to restore them will be made every three the computer restarts. Discontinued targets Name Status p1_1986-05.com.eLink.pdn-4000-4M80ad48.dev5.ctr3. Connected Progress report Immediate Login Succredded Persistent Login failed, target will not be available after system release Cancel Done

IEEE Initiator Properties Target: Discovery | Favorite Targets | Volumes and Devices | RADUS | Configuration | Quick Connect: To discover and log on to a target using a basic connection, type the IP address or DNS name of the target and then click Quick Connect. Target: 1 Discovered targets Name Value ign: L986-06.com A-link.dsn-6000-FTNkAdNk.dsv.0.clr 1 Inactive To connect using advanced options, select a target and then click Connect. To completely disconnect a target, select the target and then click Disconnect. For target properties, including configuration of sessions, select the target and click Properties. For configuration of devices associated with a target, select the target and then click Devices. Connect Disconnect Properties... Devices... More about basic IEEE connections and lenses OK Cancel Apply

  1. 您的電腦已連線至 iSCSI 磁碟

Building Networks for People

Panduan Instalasi Singkat DSN-6000 Series

iSCSI IP SAN Storage

Isi Paket

natural_image Front view of a black server rack unit (no visible text or labels)

IP SAN Storage Penampan HDD

D-LINK DSN-6420 - Isi Paket - 1

natural_image Exterior view of a hard drive (no visible text or symbols)

ban HDD

D-LINK DSN-6420 - Isi Paket - 2

natural_image Three black cables with white connectors, arranged in a row (no text or symbols visible)

Kabel listrik

D-LINK DSN-6420 - Isi Paket - 3

natural_image Two black cables with connectors, one open and one closed, against a plain background (no text or symbols visible)

Kabel RS-232

D-LINK DSN-6420 - Isi Paket - 4

natural_image Pure electrical circuit lines without any symbols

CD Kunci-kunci,

D-LINK DSN-6420 - Isi Paket - 5

natural_image Metallic metal strips with grooves, no visible text or markings

Perangkat Rel

D-LINK DSN-6420 - Isi Paket - 6

natural_image Collection of mechanical parts including bolts, screws, and key holders (no text or symbols visible)
natural_image Close-up of a hard disk drive with visible internal components and mounting bracket (no text or symbols)
natural_image Exterior view of a hard disk drive (no visible text or labels)
natural_image Internal hard disk drive with visible mounting bracket and drive casing (no text or symbols)

Sistem penomoran lubang hard disk

Lubang 1 Lubang 4Lubang 7 Lubang 10
Lubang 2 Lubang 5Lubang 8 Lubang 11
Lubang 3 Lubang 6Lubang 9 Lubang 12

Langkah 1

Quick translation Step 2 : Network setting MAC address MAC address : 081279(00:00:00) Address # # Status Address: 152.136.813 Name: 102.136.114 Subology: 102.136.829 DNS DNS : Port HTTP port : 96 HTTP port : 942 SSH port : 98 Cancel → Back Next →

Langkah 2

Langkah 3: Atur data mengenai alamat IP kemudian klik "Next". Langkah 4: Atur level RAID dan ukuran volume kemudian klik "Next".

Quick installation Step 3 : SCSI IP address LINK: C: DHCP State Address : 100.004.2.1 Mask : 100.004.2058 Gateway : 100.004.2.254 Cancel → Back Next >

Langkah 3

Quick Variables Step 4 : Volume setting BAN2 level : BAN2 (100%) BAN2 (100%) BAN2 (100%) BAN2 (100%) BAN2 (100%) BAN2 (100%) BAN2 (100%) BAN2 (100%) BAN2 (100%) BAN2 (100%) BAN2 (100%) BAN2 (100%) C:\Users\Back Next

Langkah 4

  1. Klik "Done".

Quick Connect Targets that are available for connection at the IP address or DNS name that you provided are listed below. If multiple targets are available, you need to connect to each target individually. Connections made here will be added to the list of Favorite Targets and an attempt to restore them will be made every time the computer restarts. Discovered targets Name Status ppl.1986-05.cun.plink.dsn-6000-PTM0a588.dev3.c1. Connected Progress report Immediate Login Succeeded Persistent Login failed, target will not be available after system reboot Connect Done

ICSX Initiator Properties Targets | Discovery | Favorite Targets | Volumes and Devices | RADIUS | Configuration | Quick Connect: To discover and log on to a target using a basic connection, type the IP address or DNS name of the target and then click Quick Connect. Target: 1 Add Connect... Discovered targets Refresh Name Value Status log 1966-06.com A link dir=6000-PTN0xN8 dev0.cfs 1 Inactive To connect using advanced options, select a target and then click Connect. To completely disconnect a target, select the target and then click Disconnect. For target properties, including configuration of sessions, select the target and click Properties. For configuration of devices associated with a target, select the target and then click Devices. Connect Disconnect Properties... Devices... More about basic ICSX connections and targets OK Cancel Apply

  1. Komputer anda sekarang terhubung dengan disk iSCSI.

DUKUNGAN TEKNIS

Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : D-LINK

Model : DSN-6420

Category : Server