BTPC-PH3 - Tablet BRIGMTON - Free user manual and instructions
Find the device manual for free BTPC-PH3 BRIGMTON in PDF.
| Product Type | Tablet (Mobile Internet Device) |
| Brand | Brigmton |
| Model | BTPC-PH3 |
| Operating System | Android |
| Display | Touch screen with auto-rotation (G-sensor) |
| Connectivity | Wi-Fi 802.11 b/g/n, Bluetooth, 3G/2G (via SIM), GPS, FM Radio |
| SIM Card | Dual SIM support for voice, video calls, messaging, data |
| Storage | Internal NAND storage; expandable via microSD card |
| Camera | Front and back cameras (switchable) |
| Audio | Speaker, 3.5mm headphone jack (used as FM antenna) |
| Battery | Rechargeable lithium-ion; charged via AV adaptor or USB |
| Power Supply | AC/DC adaptor (AV adaptor) included |
| Ports | USB (for data/charging), microSD slot, SIM slots |
| Sensors | G-sensor (auto-rotation), GPS |
| Security | Screen lock via pattern, PIN, or password; unknown sources toggle |
| Maintenance | Keep dry; avoid shock, heat, cold; do not disassemble |
| Reparability | Service only by authorized agents; no user-serviceable parts |
| Included Accessories | USB cable, AV adaptor, earphones (for FM radio) |
| Regulatory Compliance | CE marked; EMC and safety directives |
| Languages Supported | Multiple languages (including English, Spanish, French, etc.) |
Frequently Asked Questions - BTPC-PH3 BRIGMTON
User questions about BTPC-PH3 BRIGMTON
0 question about this device. Answer the ones you know or ask your own.
Ask a new question about this device
Download the instructions for your Tablet in PDF format for free! Find your manual BTPC-PH3 - BRIGMTON and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. BTPC-PH3 by BRIGMTON.
USER MANUAL BTPC-PH3 BRIGMTON
3.5 Interfaz principal
4.2 WiFi
Para conectar a una red WiFi:
4.3 Bluetooth
4.4 Uso de datos
4.5 Otras funciones

Redes Móviles
4.6 Perfiles de audio

4.7 Pantalla
4.8 Almacenamiento
Tarjeta Micro SD:

Uso en tarjeta SD


5.2 Vídeo
natural_image
Cartoon character of a mouse lying down, holding a video player (no visible text or symbols)5.5 Radio FM
Buscar contacto:

Añadir contacto:

7. INTERNET
7.1 Navegador
8. GPS
9.2 Calculadora
Seleccione el icono


1.2 Safety Instruction
2 MID Introduction
2.1 MID Operation and Preparation
2.3 MID Status and Reminder
3 Quick Start Guide
3.1 Keys Function
3.2 Startup and Shutdown
3.3 Open and Close the Screen
3.4 Usage of Touch Screen
3.5 Main Interface
3.6 Visit Application Procedures
3.7 USB Connection
3.8 Words Input
3.9 Application Technique
4 Basic Setting
4.1 SIM Card Management Management
4.2 Wireless and Internet
4.3 Bluetooth
4.4 Data Usage Situation
4.5 More
4.6 Contextual Model
4.7 Display
4.8 Storage
4.9 Battery
4.10 Application
4.11 Account and Sync
4.12 Location Service
4.13 Security Setting
4.14 Language and Input Method
4.15 Backup and Reset
4.16 Date and Time
4.17 Fixed-time Startup and Shutdown
4.18 Assistance Function
4.19 Engineer Selection..
4.20 About Tablet
5 Multi-Media
5.1 Music
5.2 Video
5.3 Photo Gallery
5.4 Camera
5.5 FM Radio
6 Communication Function
6.1 Phone
6.2 Text Message
6.3 Contact List
7 Internet
7.1 Browser
7.2 Email
8 GPS Function
9 Other Application Procedures
9.1 Clock
9.2 Calculator
9.3 File Manager
9.4 Recorder
10 Installation of Procedures
10.1 Installation
10.2 Uninstall
11 Troubles Shooting
1 INTRODUCTION
1.1 Announcements
Preventive maintenance
- Please always keep the MID dry. To avoid the device short trouble, corrosion fault and electric short, please prevent the device, battery and charger from water and moisture, and don't operate the device or charger by wet hand.
- To avoid failure of device, battery and charger, please prevent the device, battery, charger from violent shock or shake.
- To avoid failure of device, battery and charger, please prevent the device, battery, charger of all over heating or too cold circumstance
- Never shock, throw, prod the MID, or drop, extrude, bend the MID.
- Never disassemble the device and accessories arbitrarily, otherwise the device and accessories are not in our company warranty scope.
1.2 Safety Instruction
Before the operation of the MID, please read this chapter and teach your kids about these information. For further details, please refer to the safety instructions and announcement.
- Never use the MID when driving car, in order to ensure safe driving.
- In the medical area, please abide by related rules and regulations. Please shut down the MID when it is near to the medical area.
- To avoid the wireless signal to interrupt the plane-controlled signal, please shut down the MID or using airplane mode when you are boarding a flight,
- To avoid electronic equipment failure, please shut down the MID in the vicinage of high-accuracy electronic equipments.
- Please don't disassemble the MID and accessories. Only authorized agent has access to service the MID.
- Please keep the MID far away from magnetic equipments, the radiation of MID may erase the data stored in the magnetic equipments.
- Never use the MID in the vicinage of high temperature, inflammable gas (gas station).
-
Protect the MID and accessories from kids reach scope, and avoid the kids to use the MID without parents' supervision.
-
Please comply with related rules and regulations, and respect others' privacy and legal rights while using the MID.
- Please strictly adhere to related instructions in the manual when using USB cable to ensure the safety of the MID or PC.
- Never use the MID in bathroom or other humid environment, and please protect the MID from liquid wash or wet.
2 INTRODUCTION
2.1 MID Operation and Preparation
Battery Charging
If this navigator is first used, please use AV adaptor to fully charge it.
- Apply the power adaptor to charge for MID.
MID Status and Reminder
Reminder icons
When some remind message appears in your reminder window, please click column and slip the screen to open the reminder list. Choose the menu you need, and confirm the information. Then you can close the reminder window through clicking the column to slide up.
Please refer to below status icons:
![]() | New email | ![]() | Airplane Mode on |
![]() | USB connected | ![]() | USB debugging connected |
![]() | Return button | ![]() | Downloading |
![]() | Setting button & Display recently-used application | ![]() | Home button |
![]() | Current electric volume. | ![]() | WIFI connected, internet is available |
Reminder board
Reminder icons will work while receiving emails, WIFI is open, you can open the reminder board to view the detailed information.
Open the reminder board
When the reminder column shows new reminder icon, please hold the column and slip down your finger, then the reminder board is opened.
3 QUICK START GUIDE
3.1 Keys Function
| Power button | Short press to sleep/wake up, long press startup and shutdown. |
| Volume + (up) | increase the volume |
| Volume - (down) | decrease the volume |
HOME button (home) ![]() | Click it in any interface will return to mair interface. |
Back button (back) ![]() | click it in any interface will return to previous menu |
Menu button ![]() | This button will display in menu interface. |
Setting button ![]() | Can set the system and other menus &display recently browsed history |
Keys Function Description:
3.2 Startup and Shutdown
Startup
Long press POWER key for three seconds, you can enter into startup picture. The system enters into screen lock status, please unlock it.
Shutdown
- Long press POWER, it will popup shutdown window.
- Shutdown window contains mute mode, airplane mode, reboot mode and shutdown four options.
- Click Shutdown is the last step.
3.3 Open and Close of the Screen
Screen will be closed on its own when no operation happens.
- Screen will be closed on its own if no operation happens for some time to save battery power
- When screen is open, press POWER key, the screen will be closed immediately.
Open the screen when it is closed.
If the screen is closed, short press POWER to open the screen. The screen will be locked open it, it will show the picture as below picture, left slide to unlock and enter into camera, right slide the unlock icon to unlock the screen.

Picture 3.1
3.4 Usage of Touch Screen
MID operating methods
There are below methods to view the main screen, menu and application procedure in your MID.
Click
When you want to use the screen keyboard typing or choose application in the main interface, you only need to touch it by your finger.
Press on
If you want to open some item( textbox or the link in the webpage), or shortcut and main procedure move, you can press on this item.
Quickly slide or slide
Quickly slide or slide indicates make quick vertical or horizontal movement by finger.
Pull
Before you pull, you need to hold the it with strength until you pull it into the position you want.
Rotate
For most pictures, you only need to retate the MID sidewise to change the screen direction from horizontal to vertical. For instance, when you are typing wods, and watching movies.
3.5 Home Page
Main interface as below picture 3.2, long press the blank and it will popup windows to set wallpaper, folder, widgets, and shortcut.

Picture 3.2
The extended home page
The home page can be extended beyond the wideness of screen to provide more
space, which you can put new-added shortcuts and widgets. Click the blank
space in home page then slide right or left to extend to the right or left of the
screen. In the home page, there are two extended pictures, as
Picture 3.3.

Picture 3.3
The shortcut icons management in desktop application.
Create folder icon in desktop
- Drag the icons need to be put together on one icon(can also overlay several icons)as Picture 3.4.
- Then click the overlayed icons, the applications can be folded, as Picture 3.5.
Click the unnamed folder in the black box, it will popup the hidden keyboard, the folder name can be renamed (this is similar with Apple IOS system), the icons position can be changed through long press.

Picture 3.4

Picture 3.5
Remove the icons in desktop
- Long press the icons need to be remove, then on the right
above of the screen, it will appear

- Drag the icon to the above of the remove icon, till the icon become red, then move your finger to delete the icon.
Change the wallpaper of desktop
-
In home page, long press any blank space in main screen, it will popup a window to change the wallpaper.
-
Click the gallery or wallpaper gallery to select the wallpaper.
3.6 Visit Application Procedures
Click right top of Picture 3.2, enter into main interface as Picture 3.6, choose the application procedure you want to visit.

Picture 3.6
3.7 USB Connection
MID storage configuration
Before transmitting documents, you have to conduct storage configuration for your MID:
- Connect the MID and computer by USB cable, the reminder column will show the remind information.
- Open the reminder board; please view the MID status and reminder to learn how to open the board.
- In the reminder board, click the "USB Connected", it will as below Picture 3.4, then click "open USB storage configuration".
- Now the USB is connected successfully.

Picture 3.7
Copy the document into memory card
- Connect the MID to computer with USB cable.
- As MID storage configuration, it is connected with computer successfully.
- Open the "My computer" in your computer, check the items in "removable disc".
- Copy the documents you need into "removable disc".
- After copying finishes, click "shutdown the USB storage configuration" to uninstall.
Notice: When the MID is connected with USB cable, and you open the USB storage configuration, you can't view the memory card through the MID. Only after you detach the USB cable, you can view the memory card in the MID.
3.8 Typing words
Use the screen keyboard
When you start the procedure or choose the words or numbers edition, it will show the screen keyboard. The keyboard contains below typing options:
- Android keyboard
- Google Pinyin
Choose the typing method you want
- Click Setting procedure application.
- Click Language and Keyboard.
- In the text setting area will reveal all the installed words-typing methods in your MID.
- Tick the typing method you want.
Use and switch of input method

Picture 3.8
3.9 Operation Technique
Enter widgets interface
In the application interface, click widgets on the above of screen, or slide the screen, it will switch into widgets interface. Long press any widget to create its shortcut, then you can enter into the application through the shortcut icon.
Create application shortcut icons in the desktop
In the application interface or widgets interface, long press any icon to switch into desktop automatically, drag and hold the icon, you can move to any position in the desktop.
Remind: If the target position has no space, the widget won't be add in the main screen.
4 BASIC SETTING
4.1 SIM Management
4.1-1 Voice call
Click settings in main menu, choose SIM Management, as Picture 4.1

Picture 4.1
Click voice call, choose defaulted SIM card, as Picture 4.2

Picture 4.2
4.1-2 Video Call
Click settings in main menu, choose SIM Management, and click video call, choose defaulted SIM card when makes video call, as Picture 4.3

Picture 4.3
4.1-3 Message
Click settings in main menu, choose SIM Management, click message,
choose the defaulted SIM card when sends message, as Picture 4.4

Picture 4.4
4.1-4 Data Connection
Click setting application in main menu, choose SIM management, click data connection, choose the defaulted SIM card, as Picture 4.5

Picture 4.5
4.2 Wireless and Internet
1. Connect Wi-Fi
1) In the main menu or interface, choose setting application procedure.
2) Click WLAN, open wifi, MID will automatically search the available Wifi wireless internet. As Picture 4.6
3) Choose the Wi-Fi internet you want to connect, if it has password, it will popup the password window, enter password, click connect.

Picture 4.6
2. Add Network
1) Click 🐎 NETWORK h right top, as Picture 4.7

Picture 4.7
2) Input network SSID, the wireless network name, click save.
3) Click user name already saved, click connect to use network, as Picture 4.8

Picture 4.8
3. Network Notice
If you open Network Notice, when WIFI signal appears, the right bottom will remind you available WLAN network, as Picture 4.6
-
Keep WI-FI on during sleep..
-
Click ☐ on in right top of Picture 4.8, select advanced.
-
Click Keep WI-FI on during sleep, as Picture 4.9

Picture 4.9
Bluetooth
Bluetooth function operation
- Click setting application in main menu interface
- Click bluetooth and open it.
- If somebody open bluetooth in your surroundings, click search device in right above, then MID will automatically search the bluetooth device nearby. As picture 4.10

Picture 4.10
-
Click the available Bluetooth device, it will popup request window, enter into related password, and match the device to connect.
-
After match successfully, choose the operation you want to,
click

enter into Picture 4.11.

Picture 4.11
Bluetooth setting
1. Rename tablet
Click i on in right top of Picture 4.10, as Picture 4.12, select rename tablet, you can rename it as you want

Picture 4.12
2. Check visibility timeout
Select visibility timeout setting in Picture 4.12, choose the time you want to set, as Picture 4.13(Note: check overtime setting is the time setting when Bluetooth is checked)

Picture 4.13
Display the file you received
Choose display the file you received in Picture 4.12, you can view download and upload files.
Bluetooth advanced setting
Choose Bluetooth advanced setting in Picture 4.12, enter into Picture 4.14

Picture 4.14
-
File transmission: Open file transmission service, Connect Bluetooth FTP and customer device to visit and operate the file.
-
Bluetooth distance induction device
Open Bluetooth distance induction device, when two Bluetooth devices distance is quite far or connection is cut off, the Bluetooth will remind you with sound.
4.4 Data Usage
Check SIM card data usage, as Picture 4.15

Picture 4.15
Check WIFI data usage
Click 📄 on in right top of Picture 4.15, click Data Usage, as Picture 4.16

Picture 4.16
4.5 More
4.5-1 Airplane Mode
Airplane Mode can turn off WIFI and GSM card function quickly, when airplane mode is turned on, WIFI and GSM can't get any signal, then airplane mode is turned off, WIFI and GSM module will recover to previous state.
4.5-2 VPN
Open VPN, click add VPN network, as Picture 4.17. Input name and server address, then save.

Picture 4.17
Click VPN, as Picture 4.18, input VPN user name and password, click connect.

Picture 4.18
4.5-3 Network sharing and portable hotspots Portable WI-FI hotspots
- Click setting application in main menu.
- Click more when wifi is well connected, open network share and portable hotspot

Picture 4.19

Picture 4.20
- Click keep WI-FI hotspots on, choose open time.
- Return to previous menu, open portable WLAN hotspots, click configure WI-FI hotspots.

Picture 4.21
- Set passwords you want to, password should be more than 8 numbers.
4.5-4 Mobile Networks
1. 3G service
Click 3G service, as Picture 4.22, choose available defaulted SIM card, GSM is 2G network, WCDMA is 3G network.

Picture 4.22
2. Access Point Name(APN)
Click mobile network, as Picture 4.23

Picture 4.23
Choose access points name (APN), choose SIM card you need to connect,
Choose connect type, as Picture 4.24

Picture 4.24
Remark: (CMWAP transmitters data through GPRS, the webpage it visit belongs to wap webpage, and CMNET support www browse mobile phone network, it can also log in webpage in computer. And the charges are also different.)
3. Network Operator
Click network operator, choose SIM card you need to connect, system will search available GSM and WCDMA network, as Picture 4.25

Picture 4.25
4.5-5 GPRS data prior mode
After Open GPRS data prior mode, systems will priority choose your network.
4.6 Contextual Model
- Open settings, click contextual model, as Picture 4.26,

Picture 4.26
2. Click standard to enter into Picture 4.27

Picture 4.27
1. Vibrate
In picture 4.27, click vibrate, MID will vibrate when someone calls you.
2. Volume
In picture 4.27, click volume, you can set ringtone, notice, and alarm volume, as Picture 4.28

Picture 4.28
3. Voice call Ringtone
In picture 4.27, click voice call ringtone to choose voice call ringtone, as Picture 4.29

Picture 4.29
4. Video call ringtone
In Picture 4.27, click video call ringtone to choose video call ringtone, as Picture 4.30

Picture 4.30
(Note: Except standard, silent, meet, outdoor are only for selection, they can't be set.)
4.7 Display
4.7-1 Adjust the screen brightness
- Click Setting application procedure.
- Click display, choose brightness,
- Drag the portlito to adjust the brightness volume. As Picture 4.31

Picture 4.31
- Click OK after brightness is adjusted.
4.7-2 Wallpapers
-
Click setting application.
-
Click display, click wallpaper.
-
You can choose different wallpapers as you like—live wallpapers---gallery(user defined)---wallpapers (system defect)---video wallpaper, as Picture 4.32

Picture 4.32
4.7-3 Auto rotation
System is defaulted as open auto rotation, when it is turned off, system won't rotate MID screen by G-sensor.
4.7-4 Sleep
-
Click setting application.
-
Click display.
-
Click sleep.
-
Set the sleep time as you want, as Picture 4.33

Picture 4.33
4.7-5 Font size
Click font size to adjust the font size, as Picture 4.34

Picture 4.34
(1) OSD position setting
Click OSD position setting, MID will adjust OSD position setting, as Picture 4.37

Picture 4.37
4.8 Storage
Open setting function, click memory, click preferred install location, you can choose isntall new application to choose preferred install location.
Check SD card and MID storage space.
-
Enter into setting application.
-
Click storage, check storage space.
1. Internal storage
System storage is the spcae MID leave for system file, as Picture 4.38. it can't be viewed.

Picture 4.38
Internal storage
Internal storage is MID local NAND storage, as Picture 4.39, if you need to check the storage content, you can check it in main menu.

Picture 4.39
2. SD card
You can check storage space, SD card available space, unmount SD card and erase SD card, as Picture 4.40

Picture 4.40
Safely remove SD card
- Click setting application.
- Click memory.
- Click uninstall SD card.
- Now you can remove SD card safely.
Note: Removing SD card safely can protect SD card and increase its lifetime.
4.9 Battery
Click setting function, select battery, you can view the battery situation, as Picture 4.41

Picture 4.41
4.10 Application program
- Click setting application in Apps.
- Select application, after enter, you can manage and delete installed application and check system used storage space and left space. (As Picture 4.42)

Picture 4.42
- View internal storage used space and left space, as Picture 4.43

Picture 4.43
- View the working device, used space and available space, as Picture 4.44

Picture 4.44
4.11 Account and Sync
- Select setting application
- Open account and sync, as Picture 4.45

Picture 4.45
3. Click add an account, as Picture 4.46

Picture 4.46
- After successfully load, it will open the sync function, as Picture 4.47

Picture 4.47
4.12 Location service
Click setting, select location service, as Picture 4.48

Picture 4.48
- Google's location service
Open Google location service, you can use WIFI to positioning MID.
- GPS satellites
Open GPS satellite, you can use GPS to positioning MID.
- GPS Assistance
Open GPS Assistance, it can increase the speed of GPS positioning, but you need to insert SIM card and use data transmission.
- A-GPS
After opening A-GPS, you can inscease positioning speed through network.
- A-GPS settings
Click A-GPS setting, enter into Picture 4.50

Picture 4.50
- Disable after reboot
Click disable after reboot, when you reboot your MID, A-GPS will auto turn off.
- Network Request
Click network request, MID can get your location through network.
- Network used
Open network used, you can choose network type, as Picture 4.51

Picture 4.51
- Server
Click server, it can switch location service, as Picture 4.52

Picture 4.52
5. Location and Google search
Open location and allow google search, you can use your location information to improve search result and other services.
4.13 Safety setting
Set locked screen
Lock the touch screen by unlock icon or password to protect your MID.
Note: After setting screen locked, you should enter the passcode each time when you startup or screen is locked
Set unlocked picture
-
Click setting application in main interface.
-
Click safe.
-
Click locked the screen.
-
Choose picture in text setting area.
-
Click next following the remind message.
-
The unlocked pattern board pop up, there are nine touch spots, connect 4 points from vertical, horizontal or diagonal direction. As Picture 4.10, move your finger from the screen when finish. The system will record you new unlock pattern.
-
Click continue.
-
When you see the reminder, enter the unlock pattern, then click confirm.

Picture 4.53
Set unlock PIN code
- Click setting application in main interface.
- Click safe.
- Click screen locked.
- Choose PIN in text setting area.
- Enter new PIN code(numbers) and click continue.
- Ener new PIN code again and click confirm.
Set unlock password
- Click setting application in main interface.
- Click safe.
- Click screen locked.
- Set password in text setting area.
- Set new password(letters and numbers) and then click continue.
- Enter the password again and the click confirm.
Unknown source
- In main interface, click setting.
- Click safety.
- Click unknown source, as Picture 4.54

Picture 4.54
Note: Manual installing APK files needs to turn on unknown source.
Language and Input Method
Click setting, select language and input method, choose language to switch language, as

Picture 4.55
Click setting, choose language and input, choose Android keyboard setting, click input language, as Picture 4.56

Picture 4.56
Choose the language you want to change in the language list, as Picture 4.57

Picture 4.57
Return to language and input method, click default, as Picture 4.58, select input method you want to use

Picture 4.58
4.14 Backup and Reset
Connect WIFI and login your google account, choose backup my data, system will backup your data into google server.
If you need to recovery factory reset, please click reset, as Picture 4.59, if you need to formulate NAND, please click reset tablet.

Picture 4.59
4.16 Date and Time
According to the preset, system will voluntarily apply the date, zone, and time provided by internet.
Manual set date, time and zone
- Click Setting application procedure.
- Slide down the screen, then click date and time.
- Turn off "auto setting of date and time".
- Turn off "auto setting zone".
- Click Zone Selecting, then choose the zone lists. Slide down the list to view more zones.
- Click Date setting, then click upper or down buton to adjust date, month, and year, click setting when you finish selection.
- Click Time setting, then click upper or down button to adjust hour and minute, click AM or PM to change morning or afternoon (there is no such selection when you see 24-hour format). Click Setting to finish.
- Click 24-hour format, switch between 12-hour or 24-hour formay, the time format you choose will be used on the alarm clock.
- Click date format setting, then choose the time format you want to show on MID.

Picture 4.60
Note: If you use the time internet provided, you will not able to set the date, time and time zone.
4.17 Fixed-time Startup and Shutdown
-
Click Setting application procedure
-
Click fixed-tine startup and shutdown.
-
Operate as below Picture 4.61

Picture 4.61
4.18 Assistance Function
4.18-1. Large size
Click it to make system font large size
4.18-2. Click power button to end calls
When Click call, press "power" button, call will end but not hold.
4.18-3. Touch and hold delay
Click touch and hold delay to increase time, as Picture 4.62

Picture 4.62
4.18-4 Install webpage script
It will allow you install webpage scrip when you open system,, but it will increase the risk when you are browsing webpage.
4.19 Engineer Selection
4.19-1 USB adjustment
After opening USB adjustment, you can use some software to read MID software, but when USB adjustment is turned on, USB storage needs to manual adjust.
4.19-2 Keep awaken state
If you open keep awaken state, it will never auto sleep when your MID is charging.
4.19-3 Pointer Location
If you open pointer location, it will display touch vertical and horizontal direction.
4.19-4 Show touches
If you open display touch screen operation, it will display touch operation on the screen. It is suggested to use with same direction as pointer location.
4.19-5 Show screen update
If you open screen refresh, it will display related area when the area is refreshing.
4.19-6 Show CPU usage
After open CUP usage, in the right top of MID will show CPU usage situation.as Picture 4.63

Picture 4.63
4.20 About Tablet
Check MID state
- Check Setting application.
- Click about tablet, check state message, model, Android version, version No and so on.
- Click state message, check battery state, battery volume, SIM state, IMEI number, IP address.
5 Multi-Media
5.1 Music
Enter into music player: in menu or desktop click music button to enter into music player, click the music you want to play, as Picture 5.1:

Picture 5.1

Picture 5.2
- Drag the progress bar to adjust play progress.
- Operation of music player button as Picture 5.2
5.2 Video
- Enter video player: choose application in main menu, choose the video you want to play.
- Operation of video player button as Picture 5.3

natural_image
Cartoon character holding a microphone, wearing a red shirt and black pants (no visible text or symbols)Picture 5.3
5.3 Photo Gallery
Photo gallery application can auto search photos and video files in SD card, and photo gallery will classify these photos and videos in folder. You can apply photo gallery to view and edit photos, set the photos as wallpaper and watch the video.
View pictures
- Click gallery application in main interface.
-
Enter into gallery, click the folder you want to view.
-
Click the picture you want to view, the system will play it in full screen mode automatically.
- The pictures can be zoom in and zoom out, put two fingers on the screen, the separate the fingers(gather up the fingers, the picture will be zoom in) or double click the screen.
Note: when you browse the pictures, slide left or right to view more pictures.
Edit and set pictures
When check the pictures in full screen mode, click menu key to display menu selection, you can choose the selection you need to edit and setting pictures.
- Slide Show
- Open a picture, use virtual key to click menu key, display menu selection.
- Click slide show, it will auto loop play(or choose button in picture folder)
- Crop
- Click menu key to display menu selection.
- Then click crop, click and drag related area to adjust the cropper.
- Click cropper and drag it inside and outside to adjust the image.
-
After adjust the size you want, click crop.
-
If you wish to give up to crop, click cancel to return to picture browse.
- Edit
- Click menu key, display the menu selection.
- Click edit.
- Adjust teh brightness, style, color, antialias setting in selection.
- Click save.
- If you want to give up edit, click return key, click not to return to picture browse.
5.4 Camera
In the main interface or desktop, click camera application procedure

enter into camera
- Operation of camera ,Switch camera: choose Menu key, click switch front/back camera, as Picture 5.4

Picture 5.4
5.5 FM Radio
Click in the main interface or desktop to enter into FM radio interface:
- Radio button operation instruction as Picture 5.5:

Picture 5.5
Click search to search FM band, as Picture 5.6

Picture 5.6
- RDS setting: click Menu key in interface, click the munu button, and choose RDS settings, enter into RDS setting as Picture 5.7, and choose the selection you want to add

Picture 5.7

- Save channels: Click 📄 on in the main interface to save the
channel, and the channel will be saved in channels list.
Note: You need to insert earphone as antenna when using FM radio, If no antenna, your MID can't search any frequency band.
6 COMMUNICATION FUNCTION
6.1 Phone
- Click Phone application procedure
- Operate as Picture 6.1

6.2 Text Message

Picture 6.2
6.3 Contact List
Click Contact list the main interface, enter into the contact list as Picture 6.3

Picture 6.3
- Search contact: click button, enter into search function
- Add contact: click button, enter into add contact interface.
7 INTERNET
7.1 Browser
In case of Wi-Fi or mobile internet is connected well (Please refer to Chapter 4.1 for wireless and internet setting), click IE browser in the main menu or desktop to enter the IE interface, as Picture 7.1

Picture 7.1
Click address bar to input the website, click start, enter into related webpage, then you can browse the website information, as Picture 7.1.2 and you can click the menu you can refresh ,save to bookmarks,,share page,bookmarks,,history and setting the webpage.

Picture7.1.2
7.2 Email
Email application procedure contains email setting guide, you can add the external POP3 OR IMAP email account of normal web email service provider (For instance, Yahoo, Gmail, Hotmail and 163), as Picture 7.2

Picture 7.2
A. Email Setting
-
After you click the sending email icon, you can see the email setting guide, which can help you to set.
-
Input your email address and password.
-
Click "Next step" button, choose your email type is POP3 or IMAP.
-
Click "Next Step" button to check whether the email box servicer can receive or send emails
-
Input the email account and display the email subject, and click finish.
-
If the email box is available, you will enter into your mail box automatically.
B. Delete the email account
You can delete setted POP3 or IMAP email account from your MID.
Click

- Enter into your mail box.
- Press Menu key.
- Click Account
- Press the account you want to delete.
- Click confirm to remove.
C. Send E-mail

-
Click to display your mail box.
-
Click the inbox, it will refresh the new emails automatically; click it to read new email.
-
Press Menu key. Menus will popup.
-
Click Edit to enter into new email editing interface.
-
Input the receiver's email address.
-
Input the subject and email content.
-
If you want to add attachment, click menu key, the menu popup.
-
Click "Attach file" (photo,music, video,contacts).
-
Click "send" to send the email out.

Picture 7.3
GPS FUNCTION
8.1 GPS Navigation
-
Map of the third parties is required for MID internal GPS satellite signal receiver positioning, after installation the device can accurately implement traffic real-time navigation, meet the needs of outdoor navigation.
-
Enter into setting interface, click GPS Test icon, enter into below picture 8.1

When positioning successfully, the blue parts will turn to green color, and it shows the latitude, longitude, height, speed, and the time of your location. As Picture 8.2
The value indicates the signal strength, the positioning time is relevant to time zone in your setting, if the time is not inconsistent with real time in your location, please check the time zone in your setting is correct or not.

9 Other Application Procedures
9.1 Clock
Click Clock procedure, enter into below interface as Picture 9.1. There are clock, picture, music and homepage buttons.

Picture 9.1
9.2 Calculator
- Click
- Enter into the basic board of calculator.
- Soft touch the numbers or operator in calculator to calculate.


Pictuer 9.2
9.3 File Manager
File manager will copy, cut, delete, rename the documents or the folder in the TF card, it also will share the files, install apk etc.

In the main menu or desktop, click the document manager icon to enter into documents manager.

Picture 9.3
- Copy, cut, delete, rename the files and folder: choose the file or folder, long pressthe file or folder to enter into the interface as Picture 9.4, you can operate the file or folder.

Picture 9.4
-Paste the copy or cut file: choose the file you want to paste, choose right top icon to enter into Picture 9.5, choose right top icon to enter into Picture 9.6

Picture 9.5

Picture 9.6
Share file: choose any file, long press it, it will popup "share", choose
the share way you want in the list

Picture 9.7
- Install apk file: Choose the file suffixed .apk in the file manager, you can install the third part software as reminder.
- Build new folder: Choose the menu you want to build the file, click

icon in right top, choose new folder, you can build new folder as inder.
9.4 Recorder
In the main interface or desktop, click recorder icon to enter into
record interface, click record key to start record. Click Stop key

to stop recording. Click Play key to play the recorded sound.
The system will auto remind you to use or abandon this record, please choose it manually.
Play the record: choose the video player to play the recorded sound, choose the recorded sound in the source manager, and click it to play.

Picture 9.8
10 INSTALLATION OF PROCEDURES
10.1 Installation
Install the third party application procedure
- Click "file manager" application procedure; choose the application procedure you need to install.
- Hold the application procedure you need to install.
- It popup install, click install apk.
- Finish the installation as guide, it will operate.
Note: The third party procedure searched from internet to use on the system are all suffixed with .apk.
10.2 Uninstall
Uninstall application procedure
- Click setting icon in main interface.
- Click manage application procedure, list all the application procedures installed in the system.
- Click the APK you want to uninstall, click uninstall.
- Click confirm to finish uninstallation.
Skill: The procedure manager installed by system has many convenient methods to uninstall after opening procedure manager, click uninstall, it will list all the application procedures installed by system.
11 Troubles Shooting
- The first startup of MID is slow
After the MID system upgraded, the first startup need to install the pre-installed application softwares, the lead time is around 2-3 minutes, the startup afterwards will be much quicker.
-
MID can't connect Wi-Fi
-
Make sure the wireless router of internet service can work in normal.
- Ensure the MID and wireless router in certain distance, and no wall or other barrier between them.
-
Ensure the user name and password both correct.
-
MID feels hot
- When many application procedures are used in meanwhile, or the brightness of screen open to the lightest or under charging, MID may feel fever. It is normal.
-
Email can't be set or Registration of application procedure.
-
Ensure your internet is well connected.
- Make sure your email setting way is correct.
-
Keep your system time and local time consistent.
-
The system is abnormal and can't work.
When you install some third party application procedure, it may cause abnormal work, you can press Reset key(next to power port) to reset the system.
-
The webpage can't be opened
-
Please keep the distance between from route to MID in effective range.
-
Please restart WIFI and try again.
-
MID works terribly slow sometimes
It is normal phenomenon. Please turn off some application you don't need in advanced task management, or uninstall some third party application to release more system resource.
"Features can change without notice"
Imported: I.R.P., S.L.
DECLARATION OF CONFORMITY
I.R.P., SL declare under our responsibility that the equipment meets the requirements indicated in the following directives:
EMC DIRECTIVES
EN60950-1:2006/A11:2009/A1:2010
EN 62311: 2088
EN 301 489-1 V1.9.2:2011-09
EN 301 489-17 V2.1.1:2009-05
EN 300 328 V1.7.1: 2006-10
ETSI EN 301 489-1 V1.9.2(2011-09)
ETSI EN 301 489-17 V2.1.1(2009-05)
Description of apparatus:
BRIGMTON Model BTPC-PH3
Movile Internet Device
Importer: I.R.P., SL
Address: Avenida Santa Clara de Cuba 5, 41007, Sevilla.













