Vevor SZJJGSG02 - Car seat

SZJJGSG02 - Car seat Vevor - Free user manual and instructions

Find the device manual for free SZJJGSG02 Vevor in PDF.

📄 72 pages English EN Download 💬 AI Question
Notice Vevor SZJJGSG02 - page 1
Pick your language and provide your email: we'll send you a specifically translated version.

User questions about SZJJGSG02 Vevor

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Car seat in PDF format for free! Find your manual SZJJGSG02 - Vevor and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. SZJJGSG02 by Vevor.

USER MANUAL SZJJGSG02 Vevor

Technical Support and E-Warranty Certificate www.vevor.com/support

PET BARRIER FOR CAR

MODEL: SZJJGSG02

We continue to be committed to provide you tools with competitive price. "Save Half", "Half Price" or any other similar expressions used by us only represents an estimate of savings you might benefit from buying certain tools with us compared to the major top brands and does not necessarily mean to cover all categories of tools offered by us. You are kindly reminded to verify carefully when you are placing an order with us if you are actually saving half in comparison with the top major brands.

VEVOR®

TOUGH TOOLS, HALF PRICE

PET BARRIER FOR CAR

MODEL: SZJJGSG02

Vevor SZJJGSG02 - VEVOR® - 1

natural_image Technical line drawing of three parallel U-shaped pipes with metal fittings and bolted joints (no text or symbols)

NEED HELP? CONTACT US!

Have product questions? Need technical support? Please feel free to contact us:

Technical Support and E-Warranty Certificate www.vevor.com/support

This is the original instruction, please read all manual instructions carefully before operating. VEVOR reserves a clear interpretation of our user manual. The appearance of the product shall be subject to the product you received. Please forgive us that we won't inform you again if there are any technology or software updates on our product.

Vevor SZJJGSG02 - NEED HELP? CONTACT US! - 1Warning - To reduce the risk of injury, user must read instructions manual carefully.
Vevor SZJJGSG02 - NEED HELP? CONTACT US! - 2This symbol, placed before a safety comment, indicates a kind of precaution, warning, or danger. Ignoring this warning may lead to an accident. To reduce the risk of injury, fire, or electrocution, please always follow the recommendation shown below.
Vevor SZJJGSG02 - NEED HELP? CONTACT US! - 3Warning- Be sure to wear gloves when using this product.

WARNING

  • Read these instructions carefully and retain them for future use.
  • When using the product, basic safety precautions should always be followed to reduce the risk of injury including the followings: A competent adult should assemble the product.
  • Keep children and pets away while assembling the product. Do not let children climb on or play with the product.
    ● Wear gloves when installing the product.
  • Do not use this product if any parts are missing, damaged, or abrase. Do not over-tighten the fasteners(hardware). Regularly examine the product for wear and tear, replace at first sign of damage or if parts become detached.

CLEANING AND MAINTENANCE

● To clean the product, wipe with a soft, slightly moist cloth.
- Never use corrosive detergents, wire brushes, abrasive scourers metal or sharp utensils to clean the product.

PRODUCTION CONFIGURATION

ModelSZJJGSG02
Product size (inch)33*32
Width adjustment range (inch)33-57
Height adjustment range (inch)32-49

PARTS LIST

ITEMNamePICTUREQ'TYITEMNamePICTUREQ'TY
AThe main network annular telescopic tube3PCSFHand screwVevor SZJJGSG02 - CLEANING AND MAINTENANCE - 112PCS
BVertical pole pipe2PCSGboltsVevor SZJJGSG02 - CLEANING AND MAINTENANCE - 212PCS
CAdjustable pole2PCSHPlastic connectorsVevor SZJJGSG02 - CLEANING AND MAINTENANCE - 36PCS
DPlastic fixed base6PCSImanualVevor SZJJGSG02 - CLEANING AND MAINTENANCE - 41PCS
EPlastic fixed platenVevor SZJJGSG02 - CLEANING AND MAINTENANCE - 56PCS

INSTALLATION INSTRUCTIONS

STEP 1:

Please take out the A parts and fix it with D and E through G (using long screws), note that the installation here cannot be too tight, the following steps need to be adjusted to the appropriate position, and F is facing one direction.

Vevor SZJJGSG02 - STEP 1: - 1

flowchart
graph TD
    A["Initial Component"] --> B["Step 1: Two parallel strips with a tool"]
    B --> C["Step 2: Three parallel strips with a bracket"]
    C --> D["Step 3: Two parallel strips with a bracket"]
    D --> E["Final Assembly Step"]

    style A fill:#f9f,stroke:#333
    style E fill:#bbf,stroke:#333

STEP 2:

Please remove part B and fix it with H and F/G (using short screws). Be careful not to install it too tightly here. The following steps need to be adjusted to the appropriate position.

Vevor SZJJGSG02 - STEP 2: - 1

natural_image Diagram showing a black rod being adjusted to a mechanical component with a blue arrow indicating motion (no text or symbols present)

STEP 3:

Press the A part (main network ring expansion pipe) and B part assembly that were installed in the first step through the spring compression buckle, and adjust the appropriate position by tightening the F on the G screw (manually tightening the nut).

Vevor SZJJGSG02 - STEP 3: - 1

text_image Press down

STEP 4:

There is a colored soft cap on one end of the B tube, this is a protection, we open this colored plastic cap, we insert C into the tube of B, there is a hand nut on C, adjust the nut to the position that is suitable for the installation height of our car.

Vevor SZJJGSG02 - STEP 4: - 1

natural_image Three parallel U-shaped metal plates with vertical connectors and a reflective surface, no text or symbols visible.

STEP 5:

Slide the dog barrier to adjust it to fit backseat or cargo areas in your car or SUV.

Vevor SZJJGSG02 - STEP 5: - 1

natural_image Diagram of three parallel U-shaped pipes with vertical connectors and blue arrows indicating direction (no text or symbols)

PRODUCT STORAGE

Open the Hand screw and the nut, take it off the car, open the circular clamps and put a piece of protective net into the packing box, complete the storage of all items, or put it back in the carton packaging.

Manufacturer: Shanghaimuxinmuyeyouxiangongsi

Address: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.

Imported to AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australia

Imported to USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730

UKREP

YH CONSULTING LIMITED.

C/O YH Consulting Limited Office 147,

Centurion House, London Road,

Staines-upon-Thames, Surrey, TW18 4AX

ECREP

E-CrossStu GmbH

Mainzer Landstr.69,

60329 Frankfurt am Main.

VEVOR®

TOUGH TOOLS, HALF PRICE

Technical Support and E-Warranty Certificate www.vevor.com/support

VEVOR®

TOUGH TOOLS, HALF PRICE

natural_image Technical line drawing of a three-tiered U-shaped heat exchanger or cooling unit (no text or symbols)

BESOIN D'AIDE? CONTACTEZ-NOUS!

flowchart
graph TD
    A["Component 1: Linear strip with two vertical bars"] --> B["Step 1: Arrow to a mechanical part"]
    B --> C["Step 2: Arrow to a separate mechanical part"]
    C --> D["Step 3: Arrow to a final assembled part"]

ÉTAPE 2 :

natural_image Diagram showing a black rod being adjusted to a mechanical component, with no visible text or symbols.

ÉTAPE 3 :

natural_image Three parallel U-shaped metal plates with vertical connectors and a horizontal line, no text or symbols present.

ÉTAPE 5 :

natural_image Diagram of three parallel U-shaped pipes with vertical connectors and blue arrows indicating direction (no text or symbols)

STOCKAGE DES PRODUITS

A/S YH Consulting Limited Bureau 147,

Centurion House, London Road, Staines-

upon-Thames, Surrey, TW18 4AX

ECREP

E-CrossStu GmbH

Mainzer Landstr.69,

natural_image Technical line drawing of three parallel U-shaped pipes with bolted connectors (no text or symbols)
natural_image Diagram showing a black rod being adjusted to a mechanical component, with no visible text or symbols.

SCHRITT 3:

natural_image Three parallel U-shaped metal plates with vertical connectors and a horizontal line, no text or symbols present.

SCHRITT 5:

natural_image Diagram of three parallel U-shaped pipes with vertical connectors and blue arrows indicating direction (no text or symbols)

PRODUKTLAGERUNG

C/O YH Consulting Limited Office 147, Centurion

House, London Road, Staines-upon-

Thames, Surrey, TW18 4AX

ECREP

E-CrossStu GmbH

Mainzer Landstr.69,

60329 Frankfurt am Main.

VEVOR®

TOUGH TOOLS, HALF PRICE

natural_image Technical line drawing of a three-tiered U-shaped heat exchanger or cooling unit (no text or symbols)
natural_image Diagram showing a black rod being adjusted to a mechanical component, with no visible text or symbols.

PASSO 3:

natural_image Three parallel U-shaped metal rods with vertical connectors, arranged in a grid pattern (no text or symbols)

PASSO 5:

natural_image Diagram of three parallel U-shaped pipes with vertical connectors and blue arrows indicating direction (no text or symbols)

Importato in AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australia

Importato negli USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730

UKREP

CONSULENZA YH LIMITATA.

C/O YH Consulting Limited Ufficio 147, Centurion

House, London Road, Staines-upon-

Thames, Surrey, TW18 4AX

ECREP

E-CrossStu GmbH

Mainzer Landstr.69,

natural_image Technical line drawing of a three-tiered U-shaped heat exchanger or cooling unit (no text or symbols)
natural_image Diagram showing a black rod being adjusted to a mechanical component, with no visible text or symbols.

PASO 3:

natural_image Three parallel U-shaped metal rods with vertical connectors, arranged in a grid pattern (no text or symbols)

PASO 5:

natural_image Diagram of three parallel U-shaped pipes with directional arrows indicating flow or movement (no text or symbols)

ALMACENAMIENTO DE PRODUCTOS

Centurion House, London Road, Staines-

upon-Thames, Surrey, TW18 4AX

ECREP

E-CrossStu GmbH

Mainzer Landstr.69,

natural_image Technical line drawing of a three-tiered U-shaped heat exchanger or coiled tube structure (no text or symbols)

POTRZEBUJESZ POMOCY? SKONTAKTUJ SIĘ Z NAMI!

flowchart
graph TD
    A["Initial Component"] --> B["Step 1: Internal Block"]
    B --> C["Step 2: Internal Block with Vertical Stripes"]
    C --> D["Step 3: Internal Block with Vertical Stripes"]
    D --> E["Final Assembly Step"]

    subgraph Process Steps
    direction LR
    A --> B --> C --> D
    end

KROK 2:

natural_image Diagram showing a black rod being adjusted to a mechanical component, with no visible text or symbols.

KROK 3:

natural_image Pure mechanical diagram of three parallel U-shaped pipes with vertical connectors and a shaded rectangular area (no text or symbols)

KROK 5:

natural_image Diagram of three parallel U-shaped pipes with directional arrows indicating flow or movement (no text or symbols)

MAGAZYNOWANIE PRODUKTU

C/O YH Consulting Limited Biuro 147, Centurion

House, London Road, Staines-upon-

Thames, Surrey, TW18 4AX

ECREP

E-CrossStu GmbH

Mainzer Landstr.69,

60329 Frankfurt nad Menem.

VEVOR®

TOUGH TOOLS, HALF PRICE

natural_image Technical line drawing of a three-tiered U-shaped heat exchanger or cooling unit (no text or symbols)

HULP NODIG? NEEM CONTACT MET ONS OP!

PRODUCTIECONFIGURATIE

ModelSZJJGSG02
Productgrootte (inch)33*32
Breedte-aanpassingsbereik (inch)33-57
Hoogteverstellingsbereik (inch)32-49

ONDERDELENLIJST

flowchart
graph TD
    A["Component 1: Linear spring, vertical rod"] --> B["Step 1: Arrow to horizontal bar"]
    B --> C["Step 2: Horizontal bar with two parallel strips"]
    C --> D["Step 3: Vertical bars arranged vertically"]
    D --> E["Step 4: Vertical bars arranged horizontally"]
    E --> F["Step 5: Vertical bars arranged horizontally"]

STAP 2:

natural_image Diagram showing a black rod being adjusted to a mechanical component, with no visible text or symbols.

STAP 3:

natural_image Three parallel U-shaped metal plates with vertical connectors and a horizontal line, no text or symbols present.

STAP 5:

natural_image Diagram of three parallel U-shaped pipes with vertical connectors and blue arrows indicating direction (no text or symbols)

PRODUCTOPSLAG

C/O YH Consulting Limited Kantoor 147, Centurion House, London Road, Staines-upon-Thames, Surrey, TW18 4AX

ECREP

E-CrossStu GmbH

Mainzer Landstr.69,

60329 Frankfurt am Main.

VEVOR®

TOUGH TOOLS, HALF PRICE

Technische ondersteuning en e-garantiecertificaat www.vevor.com/support

VEVOR®

TOUGH TOOLS, HALF PRICE

natural_image Technical line drawing of three parallel U-shaped heat exchanger or coiled tube structure (no text or symbols)

BEHÖVER HJÄLP? KONTAKTA OSS!

flowchart
graph TD
    A["Component 1: Linear spring, vertical rod"] --> B["Step 1: Arrow to horizontal bar"]
    B --> C["Step 2: Horizontal bar with internal components"]
    C --> D["Step 3: Vertical strip with inner segments"]
    D --> E["Step 4: Vertical strip with outer segments"]
    E --> F["Final Assembly Step"]

STEG 2:

natural_image Diagram showing a black rod being adjusted to a mechanical component, with no visible text or symbols.

STEG 3:

natural_image Three parallel U-shaped metal rods with vertical connectors, arranged in a grid pattern (no text or symbols)

STEG 5:

natural_image Diagram of three parallel U-shaped pipes with directional arrows indicating flow or movement (no text or symbols)

PRODUKTFÖRVARING

C/O YH Consulting Limited Office 147, Centurion

House, London Road, Staines-upon-

Thames, Surrey, TW18 4AX

ECREP

E-CrossStu GmbH

Mainzer Landstr.69,

60329 Frankfurt am Main.

VEVOR®

TOUGH TOOLS, HALF PRICE

Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : Vevor

Model : SZJJGSG02

Category : Car seat