LG F1354FDS - Washing machine

F1354FDS - Washing machine LG - Free user manual and instructions

Find the device manual for free F1354FDS LG in PDF.

📄 116 pages English EN Download 💬 AI Question
Notice LG F1354FDS - page 3
View the manual : Français FR English EN Español ES
Pick your language and provide your email: we'll send you a specifically translated version.

User questions about F1354FDS LG

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Washing machine in PDF format for free! Find your manual F1354FDS - LG and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. F1354FDS by LG.

USER MANUAL F1354FDS LG

INSTALLATIONSTRUCTIONS

Before beginning installation, read these instructions carefully. This will simplify installation and ensure that the washer is installed correctly and safely. Leave these instructions near the washer after installation for future reference.

STEAMWASHERER™

LAVADORA A

GUÍADELEUSUARIO E

Designed specially to use only HE (High-Efficiency) detergent

Sanitization Performance of Residential and Commercial, Family Sized Clothes Washers

Protocolo P172

To contact LG Electronics, 24 hours a day, 7 days a week:

1-800-243-0000

Or visit us on the Web at: us.lge.com

To contact LG Electronics, 24 hours a day, 7 days a week:

1-888-542-2623

Or visit us on the Web at: ca.lge.com

natural_image Abstract black-and-white graphic of a stylized garment with flowing lines and geometric shapes (no text or symbols)

IMPORTANT SAFETY INSTRUCTIONS

Basic Safety Precautions 3-6

PARTS AND FEATURES

Special Features 7

Key Parts and Components 8

INSTALLATION INSTRUCTIONS

Choose the Proper Location 9

Clearances 9

Flooring 10

Installations With Optional Pedestal Base

or Stacking Kit 10

Unpacking and Removing Shipping Bolts ...... 11

Connecting the Water Lines 12

Connecting the Drain Line 13

Leveling the Washer 14

HOW TO USE

Sorting Wash Loads 15

Selecting Detergent 16

About the Dispenser 16

Loading the Dispenser 17

Control Panel Features 18

Cycle Guide 19

The LED Display 20

Operating the Washer 21

Steam Cycles 22

Cycle Setting Buttons 23

Special Function Buttons 24

Custom Program 25

Secondary Functions 25

Special Care Cycles 26

CARE AND CLEANING

Regular Cleaning 27-28

Cleaning the Washer 29

Maintenance 30-31

TROUBLESHOOTING

Normal Sounds You May Hear 32

Before Calling for Service 32-34

SPECIFICATIONS/OPTIONAL ACCESSORIES

Key Dimensions and Specifications 35

Optional Accessories 35

THANK YOU!

Congratulations on your purchase

and welcome to the LG family.

Your new LG Steam Washer™

combines the most advanced

washing technology with simple

operation and high efficiency.

By following the operating and care

instructions in this manual, your

washer will provide you with many

years of reliable service.

WARRANTY 36-37

Product Registration Information

Model:

Serial Number:

Date of Purchase:

The model and serial number can be located on the rating plate on the front of the washer.

LG F1354FDS - Product Registration Information - 1

natural_image Silhouette of a clothes hanger with a hanging fabric and a spray bottle (no text or symbols)

READ ALL INSTRUCTIONS BEFORE USE

WARNING

For your safety, the information in this manual must be followed to minimize the risk of fire or explosion, electric shock, or to prevent property damage, personal injury, or loss of life.

Your Safety and the safety of others is very important.

We have provided many important safety messages in this manual and on your appliance. Always read and obey all safety messages.

LG F1354FDS - Your Safety and the safety of others is very important. - 1

This is the safety alert symbol.

This symbol alerts you to potential hazards that can kill or hurt you and others.

All safety messages will follow the safety alert symbol and either the word DANGER or WARNING.

These words mean:

⚠️DANGER:

You can be killed or seriously injured if you don't immediately follow instructions.

WARNING:

You can be killed or seriously injured if you don't follow instructions.

All safety messages will tell you what the potential hazard is, tell you how to reduce the chance of injury, and tell you what can happen if the instructions are not followed.

READ ALL INSTRUCTIONS BEFORE USE

⚠ WARNING For your safety, the information in this manual must be followed to minimize the risk of fire or explosion, electric shock, or to prevent property damage, personal injury, or loss of life.

BASIC SAFETY PRECAUTIONS

⚠ WARNING: To reduce the risk of fire, electric shock, or injury to persons when using this appliance, follow basic precautions, including the following.

  • Before use, the washer must be properly installed as described in this manual.
  • Do not wash articles that have been previously cleaned in, washed in, soaked in, or spotted with gasoline, dry cleaning solvents, or other fl ammable or explosive substances, as they give off vapors that could ignite or explode.
  • Do not add gasoline, dry cleaning solvents, or other fl ammable or explosive substances to the wash water. These substances give off vapors that could ignite or explode.
  • Under certain conditions, hydrogen gas may be produced in a hot water system that has not been used for 2 weeks or more. HYDROGEN GAS IS EXPLOSIVE. If the hot water system has not been used for such a period, before using the washer, turn on all hot water faucets and let the water flow from each for several minutes. This will release any accumulated hydrogen gas. As the gas is flammable, do not smoke or use an open flame during this time.
  • Do not allow children to play on or in the washer. Close supervision of children is necessary when the washer is used near children.
  • Before the washer is removed from service or discarded, remove the door to prevent children from climbing inside.
  • Do not install or store the washer where it will be exposed to the weather or freezing temperatures.
  • Do not tamper with controls.

  • Do not repair or replace any part of the washer or attempt any servicing other than as described in this manual. We strongly recommend that any service be performed by a qualified individual.

  • See Installation Instructions for grounding requirements.
  • ALWAYS follow the fabric care instructions supplied by the garment manufacturer.
  • Do not place items exposed to cooking oil in your washer. Items contaminated with cooking oils may contribute to a chemical reaction that could cause a load to catch fi re.
  • Use fabric softeners or products to eliminate static only as recommended by the manufacturer.
  • This washer is not designed for maritime use or for mobile installations such as in RVs, aircraft, etc.
  • Turn off the water taps and unplug the washer if the machine is to be left for an extended period of time, such as during vacations.
  • Do not use to dry articles containing foam rubber or similarly textured rubber-like materials.
  • Packaging material can be dangerous for children. There is a risk of suffocation! Keep all packaging from children.
  • Always check the inside of the washer for foreign objects before loading laundry. Keep the door closed when not in use.

gROUNDING INSTRUCTIONS

This appliance must be grounded. In the event of malfunction or breakdown, grounding will reduce the risk of electric shock by providing a path of least resistance for electric current. This appliance is equipped with a cord having an equipment-grounding conductor and grounding plug. The plug must be plugged into an appropriate outlet that is properly installed and grounded in accordance with all local codes and ordinances.

⚠ WARNING: Improper connection of the equipment-grounding conductor can result in risk of electric shock. Check with a qualified electrician or serviceman if you are in doubt as to whether the appliance is properly grounded. Do not modify the plug provided with the appliance. If it does not fit the outlet, have a proper outlet installed by a qualified electrician. Failure to follow these warnings can cause serious injury, fire, electrical shock, or death.

READ ALL INSTRUCTIONS BEFORE USE

⚠ WARNING For your safety, the information in this manual must be followed to minimize the risk of fire or explosion, electric shock, or to prevent property damage, personal injury, or loss of life.

SAFETY INSTRUCTIONS FOR INSTALLATION

⚠ WARNING: To reduce the risk of fire, electric shock, or injury to persons when using this appliance, follow basic precautions, including the following.

  • Refer to INSTALLATION INSTRUCTIONS for detailed grounding procedures. Installation instructions are packed in the washer for installer's reference. If the washer is moved to a new location, have it checked and reinstalled by a qualified service person. Failure to follow this warning can cause serious injury, fire, electrical shock, or death.
  • Do not, under any circumstances cut or remove the third (ground) prong from the power cord. Failure to follow this warning can cause serious injury, fire, electrical shock, or death.
  • For personal safety, this appliance must be properly grounded. Failure to follow this warning can cause serious injury, fire, electrical shock, or death.
  • The power cord of this appliance is equipped with a 3-prong (grounding) plug which mates with a standard 3-prong (grounding) wall outlet to minimize the possibility of electric shock hazard from this appliance.
  • This washer must be plugged into a 120VAC, 60Hz grounded outlet. Failure to follow this warning can cause serious injury, fire, electrical shock, or death.
  • Have the wall outlet and circuit checked by a qualified electrician to make sure the outlet is properly grounded. Failure to follow this warning can cause serious injury, fire, electrical shock, or death.
  • Where a standard 2-prong wall outlet is encountered, it is your personal responsibility and obligation to have it replaced with a properly grounded 3-prong wall outlet. Failure to follow this warning can cause serious injury, fire, electrical shock, or death.
  • Do not install on carpet. Install washer on a solid floor. Failure to follow this warning can cause serious leak damage.
  • Do not remove ground prong. Do not use an adapter or extension cord. Plug into a grounded 3-prong outlet. Failure to follow these warnings can cause serious injury, fire, electrical shock, or death.

  • The washer should always be plugged into its own individual electrical outlet which has a voltage rating that matches the rating plate. This provides the best performance and also prevents overloading house wiring circuits which could cause a fire hazard from overheated wires.

  • Never unplug your washer by pulling on the power cord. Always grip plug firmly and pull straight out from the outlet. Failure to follow this warning can cause serious injury, fire, electrical shock, or death.
  • Repair or replace immediately all power cords that have become frayed or otherwise damaged. Do not use a cord that shows cracks or abrasion damage along its length or at either end. Failure to follow this warning can cause serious injury, fire, electrical shock, or death.
  • When installing or moving the washer, be careful not to pinch, crush, or damage the power cord. Failure to follow this warning can cause serious injury, fire, electrical shock, or death.
  • The washer must be installed and electrically grounded by a qualified service person in accordance with local codes to prevent shock hazard and assure stability during operation.
  • Washer is heavy. Two or more people may be needed to install and move the appliance. Failure to do so can result in back or other injury.
  • Store and install the washer where it will not be exposed to temperatures below freezing or exposed to outdoor weather conditions. Failure to follow this warning can cause serious leak damage.
  • Do not install the washer in humid spaces to reduce the risk of electric shock. Failure to follow this warning can cause serious injury, fire, electrical shock, or death.

READ ALL INSTRUCTIONS BEFORE USE

⚠ WARNING For your safety, the information in this manual must be followed to minimize the risk of fire or explosion, electric shock, or to prevent property damage, personal injury, or loss of life.

SAFETY INSTRUCTIONS FOR USE, CARE AND CLEANING, AND DISPOSAL

⚠ WARNING: To reduce the risk of fire, electric shock, or injury to persons when using this appliance, follow basic precautions, including the following.

  • Unplug the washer before cleaning to avoid the risk of electric shock.
  • Never use harsh chemicals, abrasive cleaners, or solvents to clean the washer. They will damage the fi nish.
  • Do not put oily or greasy rags or clothing on top of the washer. These substances give off vapors that could ignite the materials.
  • Do not wash items that are soiled with vegetable or cooking oil. These items may contain some oil after laundering. Due to the remaining oil, the fabric may smoke or catch fire by itself.
  • Disconnect this appliance from the power supply before attempting any user maintenance. Turning the controls to the OFF position does not disconnect this appliance from the power supply. Failure to follow this warning can cause serious injury, fire, electrical shock, or death.
  • Do not combine laundry products for use in one load unless specified on the label.
  • Do not mix chlorine bleach with ammonia or acids such as vinegar. Follow package directions when using laundry products. Incorrect usage can produce poisonous gas, resulting in serious injury or death.
  • Do not reach into the washer while parts are moving. Before loading, unloading, or adding items, push in the cycle selector knob and allow the drum to coast to a complete stop before reaching inside. Failure to follow this warning can cause serious injury, fire, electrical shock, or death.

  • Do not allow children to play on or in the washer. Close supervision of children is necessary when the washer is used near children. As children grow, teach them the proper, safe use of all appliances. Failure to comply with these warnings could result in serious personal injuries.

  • Destroy the carton, plastic bag, and other packing materials after the washer is unpacked. Children might use them for play. Cartons covered with rugs, bedspreads, or plastic sheets can become airtight chambers. Failure to comply with these warnings could result in serious personal injuries.
  • Keep laundry products out of children's reach. To prevent personal injury, observe all warnings on product labels. Failure to comply with these warnings could result in serious personal injuries.
  • Remove the door to the washing compartment to avoid the danger of children or small animals getting trapped inside before your washer is removed from service or discarded. Failure to do so can result in serious personal injury or death.

SAVE THESE INSTRUCTIONS

SPECIAL FEATURES

1 DETERgENT DISPENSER DRAWER

This four-compartment drawer provides separate dispensers for prewash and main wash detergent, liquid bleach, and liquid fabric softener.

2 CONTROL PANEL WITH LED DISPLAY

Simple electronic controls are user-friendly. The LED display indicates cycle options and cycle time during operation.

3 EASY-ACCESS LOCKING DOOR

Extra-large door locks during operation and features a delay to prevent the door from being opened until the washer interior has cooled and the water level has lowered.

4 HlgH-EFFICIENCY STEAM CYCLES

During LG's unique high-efficiency STEAM cycles, the steam nozzle injects fabrics with hot steam to gently remove tough stains.

5 ROLLERJETS

The RollerJet system enhances wash performance while reducing fabric wear. Integrated jets spray clothes to further improve washing efficiency.

6 INTERIOR DRUm Light

The drum light illuminates the washer interior for greater visibility when loading and unloading. The ultra long-life LED bulbs should never need replacement.

7 DIRECT-DRIVE mOTOR

Direct-drive motor eliminates the belt and pulleys found on most washers to provide improved performance and reliability while increasing energy efficiency.

LG F1354FDS - DIRECT-DRIVE mOTOR - 1

text_image Diagram of a front-loading washing machine with numbered parts for identification

KEY PARTS AND COMPONENTS

In addition to the special features and components outlined in the Special Features section, there are several other important components that are referenced in this manual.

① ULTRA-CAPACITY STAINLESS STEEL DRUm

The ultra-large stainless steel drum offers extreme durability and is tilted to improve efficiency and allow easier access for large items.

② WATER CIRCULATION AND STEAM NOZZLES

The water circulation nozzles spray the water/detergent solution directly onto garments for super cleaning performance. During LG's unique high-efficiency STEAM cycles, the steam nozzle injects fabrics with hot steam to gently remove tough stains.

3 LEVELING FEET

Four leveling feet (two in the front and two in the back) adjust to improve washer stability on uneven floors.

4 DRAIN ACCESS PANEL

Provides access to the drain line and drain pump filter.

LG F1354FDS - DRAIN ACCESS PANEL - 1

text_image Technical diagram of a front-loading washing machine with labeled parts including door, fan, and control panel

Hot and Cold Water Inlets
LG F1354FDS - DRAIN ACCESS PANEL - 2

text_image Drain Hose Rear of Washer

Included Accessories
LG F1354FDS - DRAIN ACCESS PANEL - 3
Hot and Cold Water Hoses

LG F1354FDS - DRAIN ACCESS PANEL - 4
Caps (4) (for covering shipping bolt holes)

LG F1354FDS - DRAIN ACCESS PANEL - 5
(shipping bolts and adjusting leveling feet)

LG F1354FDS - DRAIN ACCESS PANEL - 6
Tie Strap (for securing drain hose)

LG F1354FDS - DRAIN ACCESS PANEL - 7
Elbow Bracket (for securing drain hose)

  • Washer is heavy! Two or more people are required when moving and unpacking the washer. Failure to do so can result in back or other injury.
  • Store and install the washer where it will not be exposed to temperatures below freezing or exposed to outdoor weather conditions. Failure to follow this warning can cause serious injury, fire, electrical shock, or death.
  • Properly ground washer to conform with all governing codes and ordinances. Failure to follow this warning can cause serious injury, fire, electrical shock, or death.
  • To reduce the risk of electric shock, do not install the washer in humid spaces. Failure to follow this warning can cause serious injury, fire, electrical shock, or death.
  • The base opening must not be obstructed by carpeting when the washer is installed on a carpeted floor.

- Do not remove ground prong. Do not use an adapter or extension cord. Plug into a grounded 3-prong outlet. Failure to follow this warning can cause serious injury, fire, electrical shock, or death.

Power Outlet

  • The power outlet must be within 60 in. (1.5 m) of either side of the washer.
  • The appliance and outlet must be positioned so that the plug is easily accessible.
  • Do not overload the outlet with more than one appliance.
  • The outlet must be grounded in accordance with current wiring codes and regulations.
  • Time-delay fuse or circuit breaker is recommended.

NOTE: It is the personal responsibility and obligation of the product owner to have a proper outlet installed by a qualified electrician.

CLEARANCES

LG F1354FDS - CLEARANCES - 1

text_image 22½" (57 cm) 29½" (75.6 cm) 4" (10 cm) 51" (129.7 cm)

LG F1354FDS - CLEARANCES - 2

text_image 1" (2.5 cm) 27" (68.6 cm) 1" (2.5 cm)

To ensure sufficient clearance for water lines and airflow, allow minimum clearances of at least 1 in. (2.5 cm) at the sides and 4 in. (10 cm) behind the unit. Be sure to allow for wall, door, or floor moldings that may increase the required clearances.

Allow at least 24 in. (61.2 cm) in front of the washer to open the door.

FLOORING

  • To minimize noise and vibration, the washer MUST be installed on a solidly constructed floor. See the NOTE at right.
  • Allowable slope under the entire washer is 1^ maximum.
  • Carpeting and soft tile surfaces are not recommended.
  • Never install the washer on a platform or weakly supported structure. Use only an approved accessory pedestal as described below.

NOTE: Please note that the floor must be strong and rigid enough to support the weight of the washer when fully loaded, without flexing or bouncing. If your floor has too much flex in it, you may need to reinforce it to make it more rigid. A floor that is adequate for a top-loading washer may not be rigid enough for a front-loading washer, due to the difference in the spin speed and direction. If the floor is not solid, your washer may vibrate and you may hear and feel the vibration throughout your house.

INSTALLATIONS WITH OPTIONAL PEDESTAL BASE OR STACKING kIT

IMPORTANT: If you are installing your washer using an optional pedestal base or stacking kit, please refer to Optional Accessories in this manual or to the

instructions for your pedestal or stacking kit before proceeding with the installation.

Required Dimensions for Installation With Pedestal
LG F1354FDS - INSTALLATIONS WITH OPTIONAL PEDESTAL BASE OR STACKING kIT - 1

text_image 29½" (75.6 cm) 4" (10 cm)

Required Dimensions for Installation With Stacking Kit
LG F1354FDS - INSTALLATIONS WITH OPTIONAL PEDESTAL BASE OR STACKING kIT - 2

text_image 77½" (196.8 cm) 1" (2.5 cm) 27" (68.6 cm) 1" (2.5 cm)

UNPACKING AND REMOVING SHIPPING BOLTS

When removing the washer from the carton base, be sure to remove the foam tub support in the middle of the carton base.

If you must lay the washer down to remove the base packaging materials, always lay it carefully on its side. Do NOT lay the washer on its front or back.

IMPORTANT: To prevent internal damage during transport, the washer is equipped with 4 shipping bolts and plastic retainers. These bolts and retainers MUST be removed before operating the washer.

- Failure to remove shipping bolts and retainers may cause severe vibration and noise, which can lead to permanent damage to the washer. The cord is secured to the back of the washer with a shipping bolt to help prevent operation with shipping bolts in place.

LG F1354FDS - UNPACKING AND REMOVING SHIPPING BOLTS - 1

text_image Foam Tub Support Carton Base

LG F1354FDS - UNPACKING AND REMOVING SHIPPING BOLTS - 2

text_image Shipping Bolts

1 Starting with the bottom 2 shipping bolts, use the included wrench to remove the 4 shipping bolts by turning them counterclockwise.

LG F1354FDS - UNPACKING AND REMOVING SHIPPING BOLTS - 3

text_image Hole Cap Retainer

2 Remove the retainers by turning them slightly while pulling. Rotate and press the hole caps into the shipping bolt holes.

NOTE: Save the bolts and retainers for future use. To prevent damage to internal components, the shipping bolts and retainers must be installed when transporting the washer.

CONNECTING THE WATER LINES

- IMPORTANT: Use new hoses when installing the washer. Do NOT reuse old hoses.

- IMPORTANT: Use ONLY the inlet hoses provided by LG with this laundry product. Aftermarket hoses are not guaranteed to fi t or function correctly. Other hoses may not tighten correctly and could cause leaks. Subsequent damage to product or property will not be covered under the terms of LG's warranty.

- Water supply pressure must be between 14.5 PSI and 116 PSI (100\~800 kPa). If the water supply pressure is more than 116 PSI, a pressure reducing valve must be installed.

• Periodically check the hose for cracks, leaks, and wear, and replace the hose if necessary.

• Make sure that the water lines are not stretched, pinched, crushed, or kinked.

- The washer should never be installed or stored in a location subject to freezing temperatures. Damage to the water lines and internal mechanisms of the washer can result. If the washer was exposed to freezing temperatures prior to installation, allow it to stand at room temperature for several hours before use.

LG F1354FDS - CONNECTING THE WATER LINES - 1

text_image Water Hose (to water inlet on washer) Rubber Seal Rubber Seal Water Hose (to tap)

1 Insert a rubber seal into the threaded fi ttings on each hose.

LG F1354FDS - CONNECTING THE WATER LINES - 2

text_image Water Inlets

2 NOTE: Do not cross-thread the hose fittings.

Attach the hot water line to the red hot water inlet on the back of the washer. Attach the cold water line to the blue cold water inlet on the back of the washer. Tighten the fittings securely.

LG F1354FDS - CONNECTING THE WATER LINES - 3

text_image Water Tap

3 Attach the hot water line to the hot water tap. Attach the cold water line to the cold water tap.

Tighten the fi ttings securely. Open the water taps fully to check for leaks.

CONNECTING THE DRAIN LINE

  • The drain hose should always be properly secured. Failure to properly secure the drain hose can result in flooding and property damage.
  • Do not install the end of the drain hose higher than 96 in. (244.8 cm) above the bottom of the washer.
  • The drain must be installed in accordance with any applicable local codes and regulations.
    • Make sure that the water lines are not stretched, pinched, crushed, or kinked.

Option 1: Standpipe
LG F1354FDS - CONNECTING THE DRAIN LINE - 1

text_image Elbow Bracket Drain Hose

Clip the end of the hose into the elbow bracket. Insert the end of the drain hose into a standpipe. Use tie strap to secure the drain hose in place.

NOTE: Total height of the hose end should not exceed 96 in. (244.8 cm) from the bottom of the washer.

Option 2: Laundry Tub
LG F1354FDS - CONNECTING THE DRAIN LINE - 2

text_image Elbow Bracket Laundry Tub Tie Strap Drain Hose

Clip the end of the hose into the elbow bracket. Hang the end of the drain hose over the side of the laundry tub. Use tie strap to secure the drain hose in place.

NOTE: Total height of the hose end should not exceed 96 in. (244.8 cm) from the bottom of the washer.

Option 3: Floor Drain
LG F1354FDS - CONNECTING THE DRAIN LINE - 3

text_image Drain Hose Floor Drain

Insert the end of the drain hose into the floor drain. Secure the hose in place to prevent it from moving.

INSTALLATION INSUCRUCONS

LEVELING THE WASHER

The drum of your new washer spins at very high speeds, up to 1,300 RPM. To minimize vibration, noise, and unwanted movement, the floor must be a perfectly level, solid surface.

NOTE: Adjust the leveling feet only as far as necessary to level the washer. Extending the leveling feet more than necessary can cause the washer to vibrate.

- All four leveling feet must rest solidly on the floor. Rock the washer gently from corner to corner to make sure that the washer does not rock.

If you are installing the washer on the optional pedestal, you must use the leveling feet on the pedestal to level the washer. The washer's leveling feet should be fully retracted and locked into position with the locknuts.

LG F1354FDS - LEVELING THE WASHER - 1

text_image Level Leveling Feet Leveling Feet

1 Position the washer in the final location, taking special care to not pinch, strain, or crush the water and drain lines. Place a level across the top of the washer.

LG F1354FDS - LEVELING THE WASHER - 2

text_image Raise Lower

2 Loosen the locknuts on all 4 leveling feet until you can turn the feet with the included wrench. Turn clockwise to raise the washer or counterclockwise to lower it.

LG F1354FDS - LEVELING THE WASHER - 3

text_image Tighten all 4 locknuts securely

3 Once the washer is level from side to side and front to back, tighten all locknuts securely.

Make sure that all 4 leveling feet are in firm contact with the floor.

NOTE: To make sure that the washer is properly level, run the washer with a test load: place approximately 6 pounds of laundry in the machine. Then press POWER, press RINSE+SPIN, and then press the START/PAUSE button. See the following sections for additional information on cycle selection and operation.

Verify that the washer does not rock or vibrate excessively during the spin cycle. If the washer vibrates or shakes, adjust the leveling feet until the washer is stable and retest.

SORTING WASH LOADS

Fabric Care Labels

Most articles of clothing feature fabric care labels that include instructions for proper care.

Fabric Care Labels
Machine wash cycle
LG F1354FDS - Fabric Care Labels - 1

LG F1354FDS - Fabric Care Labels - 2

LG F1354FDS - Fabric Care Labels - 3

LG F1354FDS - Fabric Care Labels - 4

LG F1354FDS - Fabric Care Labels - 5
Water temperature

LG F1354FDS - Fabric Care Labels - 6

LG F1354FDS - Fabric Care Labels - 7

LG F1354FDS - Fabric Care Labels - 8
Warm (40°C/105°F)
Cold/cool (30°C/85°F)

Hot (50°C/120°F)
Bleach symbols
LG F1354FDS - Fabric Care Labels - 9

LG F1354FDS - Fabric Care Labels - 10

LG F1354FDS - Fabric Care Labels - 11

Grouping Similar Items

For best results, sort clothes into loads that can be washed with the same wash cycle.

Different fabrics have different care requirements. Always wash dark colors separately from light colors and whites to prevent discoloration. If possible, do not wash heavily soiled items with lightly soiled ones. The chart below shows recommended groupings.

Sort Laundry...
by Colors by Soil by Fabric by Lint

Whites HeavyDelicates Lint Producer
Lights NormalEasy Care Lint Collector
Darks LightSturdy

Loading the Washer

  • Check all pockets to make sure that they are empty. Items such as clips, matches, pens, coins, and keys can damage both your washer and your clothes.
  • Close zippers, hooks, and drawstrings to prevent these items from snagging or tangling on other clothes.
  • Pretreat heavily stained areas for best results.
  • Combine large and small items in a load. Load large items first.
  • Large items should not be more than half of the total washload.
  • The washer can be fully loaded, but the drum should not be tightly packed with items. The door of the washer should close easily.
  • To prevent an out-of-balance load, do not wash single items. Add one or two similar items to the load. Large, bulky items, such as a blanket, comforter, or bedspread should be washed individually.
  • Do not wash or spin waterproof clothes.
  • When unloading the washer, check under the door seal for small items.

NOTE: The front loading washer rotates the wet laundry to wash it with less water. If you do not see the water during washing, it is not a problem because the laundry is sufficiently wet.

LG F1354FDS - Loading the Washer - 1

natural_image Simple black icon of a computer mouse with a square button (no text or symbols)

SELECTING DETERgENT

IMPORTANT: Your Steam Washer™ is designed for use with only High-Efficiency (HE) detergents. HE detergents are formulated specifically for front-load washers and contain suds-reducing agents. Always look for the HE symbol when purchasing detergent.

HE detergents produce fewer suds, dissolve more efficiently to improve washing and rinsing performance, and help to keep the interior of your washer clean.

Using a regular detergent may cause oversudising and unsatisfactory performance.

IMPORTANT: Do not place or store laundry products, such as detergent, bleach, or liquid fabric softener, on top of your washer or dryer. Wipe up any spills immediately. These products can damage the finish and controls.

LG F1354FDS - SELECTING DETERgENT - 1

Designed specially to use only HE (High-Efficiency) detergent

ABOUT THE DISPENSER

The automatic dispenser consists of four compartments which hold:

  • Liquid chlorine bleach.
  • Liquid fabric softener.
  • Liquid or powdered detergent for prewash.
  • Liquid or powdered detergent and color-safe bleach for main wash.

All laundry products can be added at once in their respective dispenser compartments. They will be dispensed at the appropriate time for the most effective cleaning.

After adding the laundry products to the dispenser, close the dispenser drawer.

To add detergent, bleach, and fabric softener to the automatic dispenser:

1 pen the dispenser drawer.
2oad the laundry products into the appropriate compartments.
3 Slowly close the dispenser drawer to avoid early dispensing of the laundry products.

NOTE: It is normal for a small amount of water to remain in the dispenser compartments at the end of the cycle.

LG F1354FDS - ABOUT THE DISPENSER - 1

text_image Liquid Chlorine Bleach Compartment Liquid Fabric Softener Compartment Insert Liquid Detergent Cup Prewash Detergent Compartment Main Wash Detergent Compartment

LOADING THE DISPENSER

Prewash Detergent Compartment

Add liquid or powdered detergent to this compartment when using the Prewash option. Always use HE (High-Efficiency) detergent with your washing machine.

- The amount of detergent added for the Prewash option is 1/2 the amount recommended for the main wash cycle. For example, if the main wash cycle requires one measure of detergent, add 1/2 measure for the Prewash option.

NOTE: If liquid detergent is to be used for the main wash when using the pre-wash option, the liquid detergent cup accessory must be used in main wash dispenser to prevent the main wash liquid detergent from being dispensed immediately.

Main Wash Detergent Compartment

This compartment holds laundry detergent for the main wash cycle, which is added to the load at the beginning of the cycle. Always use HE (High-Efficiency) detergent with your washing machine.

Never exceed the manufacturer's recommendations when adding detergent. Using too much detergent can result in detergent buildup in clothing and the washer. Either powdered or liquid detergent may be used.

  • When using liquid detergent, make sure the liquid detergent cup and insert are in place. Do not exceed the maximum fill line.
  • When using powdered detergent, remove the insert and liquid detergent cup from the compartment. Powdered detergent will not dispense with the liquid detergent cup and insert in place.

NOTE: Liquid or powdered color-safe bleach may be added to the main wash compartment with detergent of the same type.

LG F1354FDS - Main Wash Detergent Compartment - 1

Designed specially to use only HE (High-Efficiency) detergent

Liquid Bleach Compartment

This compartment holds liquid chlorine bleach, which will be dispensed automatically at the proper time during the wash cycle.

  • Do not add powdered or liquid color-safe bleach to this compartment.
  • Always follow the manufacturer's recommendations when adding bleach. Do not exceed the maximum fill line. Using too much bleach can damage fabrics.
  • Never pour undiluted liquid chlorine bleach directly onto the load or into the drum. Fabric damage can occur.

Fabric Softener Compartment

This compartment holds liquid fabric softener, which will be automatically dispensed during the final rinse cycle.

  • Always follow the manufacturer's recommendations when adding fabric softener. Do not exceed the maximum fill line. Using too much fabric softener may result in stained clothes.
  • Dilute concentrated fabric softeners with warm water. Do not exceed the maximum fill line.
  • Never pour fabric softener directly onto the load or into the drum.

CONTROL PANEL FEATURES
LG F1354FDS - Fabric Softener Compartment - 1

text_image *STEAM CYCLE BULKY/LARGE COTTON/NORMAL PERM. PRESS SANITARY DELICATES ALLERGIENE™ HAND WASH/WOOL STEAM FRESH™ SPEED WASH 1 2 3 4 6 7 8

Press & Hold Basic for Extra Functions

STEAM DELAY WASH PRESS WATER PLUS WASH/RINCE OF BREAD PRE-WASH SENSE-SPIN 18:88 EXTRA HIGH HAPPY/SPIN EXTRA HOT/COLD HOT/COLD EXTRA HIGH MEDIUM NO SPIN HEAVY NORMAL LIGHT HIGH LOW OFF WASH/RINSE SPIN SPEED SOIL LEVEL BEEPER

1 POWER ON/OFF BUTTON

Press to turn the washer ON. Press again to turn the washer OFF.

NOTE: Pressing the ON/OFF button during a cycle will cancel that cycle and any load settings will be lost.

② CYCLE SELECTOR KNOB

Turn this knob to select the desired cycle. Once the desired cycle has been selected, the standard presets will be shown in the display. These settings can be adjusted using the cycle setting buttons anytime before starting the cycle.

3 START/PAUSE BUTTON

Press this button to START the selected cycle. If the washer is running, use this button to PAUSE the cycle without losing the current settings.

NOTE: If you do not press the START/PAUSE button within 4 minutes of selecting a cycle, the washer automatically turns off.

4 STEAm BUTTON

Press the STEAM button to add steam to the selected cycle for added cleaning power.

NOTE: Steam can only be added to the following cycles: STEAMFRESH™, SANITARY, BULKY/LARGE, PERM. PRESS, COTTON/NORMAL, and ALLERGIENE™.

5 CYCLE SETTING BUTTONS

Use these buttons to select the desired cycle options for the selected cycle. The current options are shown in the display. Press the button for that option to view and select other settings.

6 DELAY BUTTON

Press this button to delay the start of the wash cycle. Each press of the button increases the delay time by one hour, up to 19 hours.

7 LED DISPLAY

The display shows the settings, estimated time remaining, option, and status messages for your Steam Washer™. The display will remain on through the cycle.

8 SPECIAL FUNCTION BUTTONS

The special function buttons allow you to select additional functions and will light when selected. Certain buttons also allow you to activate secondary functions by pressing and holding the button for 3 seconds.

For detailed information about the individual functions, please see the following pages.

CYCLE GUIDE

The cycle guide below shows the options and recommended fabric types for each cycle.

CycleFabric TypeWash/Rinse Temp.Spin Speed Soil LevelPre-WashRinse + SpinExtra RinseWater PlusSteam Wash/Rinse Optimizer^ TM
Steam Fresh^ TM Dress shirts, blouses
SanitaryHeavily soiled underwear, work clothes, diapers, etc.Extra Hot/ColdHighNormal
Extra High No Spin Low MediumHeavy Light
Bulky/ LargeLarge items such as blankets and comfortersWarm/ColdLowNormal
Warm/Warm Hot/Cold Cold/ColdMedium No SpinHeavy Light
Perm. PressDress shirts/pants, wrinkle-free clothing, poly/cotton blend clothing, tableclothsWarm/ColdMediumNormal
Warm/Warm Hot/Cold Cold/ColdHigh No Spin LowHeavy Light
Cotton/ NormalCotton, linen, towels, shirts, sheets, jeans, mixed loadsWarm/ColdHighNormal
Warm/Warm Hot/Cold Cold/ColdExtra High No Spin Low MediumHeavy Light
Allergiene™Cotton, underwear, pillow covers, bed sheets, baby wearHigh
Extra High No Spin Low Medium
DelicatesDress shirts/blouses, nylons, sheer or lacy garmentsCold/ColdMediumNormal
Warm/Cold Warm/WarmNo Spin LowHeavy Light
Hand Wash/ Wool 📁Items labeled "hand-washable"Warm/ColdLowNormal
Warm/Warm Cold/ColdNo SpinLight
Speed WashLightly soiled clothing and small loadsHot/ColdExtra HighLight
Cold/Cold Warm/Cold Warm/WarmNo Spin Low Medium HighNormal Heavy

NOTE: To protect your garments, not every wash/rinse temperature, spin speed, soil level, or option is available with every cycle.

THE LED DISPLAY

The LED display shows the settings, estimated time remaining, options, and status messages for your washer. When the washer is turned on, the display will illuminate.

LG F1354FDS - THE LED DISPLAY - 1

text_image PROCESS LOAD SENSING WASH RINSE SPIN EST.TIME REMAINING 18:88 3 4

1 CYCLE COMPLETION INDICATOR

This portion of the display shows which stage of the wash cycle is currently underway (LOAD SENSING, WASH, RINSE or SPIN).

At the beginning of the cycle, the washer tumbles the load and detects the weight of the clothes. The display will indicate the approximate load size as the number 1 to 4 for 5 seconds. (This allows COTTON/NORMAL, ALLERGIENE™, SANITARY course). This allows you to adjust the amount of detergent and other additives for best results and improved efficiency.

2 ESTIMATED TIME REMAINING

When the START/PAUSE button is pressed, the washer automatically detects the wash load (weight) and optimizes the washing time, based on the selected cycle and options. The display will then indicate the estimated time remaining for the selected wash cycle.

NOTE: The cycle time displayed may appear much longer than that of a top-loading washer. The displayed time is for the complete cycle, rather than just the agitation portion of the cycle, as is typically shown on a top-loading washer.

3 DOOR LOCK INDICATOR

Indicates that the door is locked. The washer door will lock while the washer is operating. The door can be unlocked by pressing the START/PAUSE button to stop the washer.

NOTE: If the temperature in the washer is too high, the door cannot be unlocked until the washer has cooled. If the water level is too high, select the DRAIN & SPIN cycle to drain excess water. Do not try to force open the door.

4 DELAY WASH INDICATOR

This indicator shows that the washer has been set for DELAY WASH. The washer will start automatically after the set delay time has passed.

Once you have loaded the washer and added laundry products (detergent, bleach, and/or fabric softener):

1 Press the ON/OFF button to turn on the washer. The lights around the cycle selector knob will illuminate.
2 Turn the cycle selector knob to the desired cycle. The display will show the preset Rinse/Wash Temperature, Spin Speed, Soil Level, and Option settings for that cycle.
3 If you would like to change the settings for that cycle, press the option button(s) to display additional settings for that option. Press the button again to cycle through the settings until the desired setting is shown.

LG F1354FDS - DELAY WASH INDICATOR - 1

NOTE: To protect your garments, not every wash/rinse temperature, spin speed, soil level, or option is available with every cycle.

4 Select any additional cycle options, such as STEAM or DELAY WASH by pressing the button for that option, or by pressing the OPTION button for additional options.

LG F1354FDS - DELAY WASH INDICATOR - 2

text_image

Press & Hold 3sec. for Extra Functions

STEAM DELAY WASH PACKERS LOAD SINGING WASM RINSE SPIN WATER PLUS WASH/RINSE OPTIMIZER PRE-WASH *RINSE+SPIN *CHILD LOCK *DRUM LIGHT 18:88 EXTRA RINSE *FUB CLEAN CUSTOM PGM *PGM SAUS

NOTE: To protect your garments, not every wash/rinse temperature, spin speed, soil level, or option is available with every cycle.

5 Press the START/PAUSE button to begin the cycle. The door will latch, the display will change, and the washer will calculate the estimated time remaining. Once

the washer has calculated the estimated total cycle time, the washer will start. To pause the cycle at any time, press PAUSE.

NOTE: The cycle time displayed may appear much longer than that of a top-loading washer. The displayed time is for the complete cycle, rather than just the agitation portion of the cycle, as is typically shown on a top-loading washer.

NOTE: If the temperature in the washer is too high, the door cannot be unlocked until the washer has cooled. If the water level is too high, select the DRAIN & SPIN cycle to drain excess water. Do not try to force the door open.

Washing time can be reduced significantly for small or lightly soiled loads by selecting the Speed Wash cycle and setting the Soil Level button to Light.

6 When the load is finished, the beeper (if set) will sound and the door will unlock.

Remove damp clothes from the washer immediately. Check under the door seal for small items.

STEAM CYCLES

LG F1354FDS - STEAM CYCLES - 1

STEAM cycles include the Sanitary, Bulky/Large, Perm. Press, Cotton/Normal, and ALLERGIENE™ cycles. Adding the

Steam option to these cycles provides superior cleaning performance while reducing energy and water consumption.

By using a hot steam spray from above and cooler water below, fabrics get the cleaning benefits of a super hot wash, without the energy usage or potential damage to fabrics.

To Add STEAM to a Standard Cycle:

1 Turn on the washer and turn the cycle selector knob to select a cycle with the STEAM option.
2 Press the STEAM button. The washer will automatically adjust the cycle settings.
3 Set any other desired options.
4 Press the START/PAUSE button to start the cycle. The washer will start automatically.

CAUTION:

Do not touch the door during steam cycles. The door surface can become very hot. Allow the door lock to release before opening the door.

Do not attempt to override the door lock mechanism or reach into the washer during a steam cycle. Steam can cause severe burns.

IMPORTANT NOTES ABOUT STEAM CYCLES:

  • Steam may not be clearly visible during the steam cycles. This is normal. Too much steam could damage clothing.
  • Do not use steam with delicate fabrics such as wool, silk, or easily discolored fabrics.
  • Do not touch the door.

Using the SteamFresh™ Cycle

SteamFresh™ uses the power of steam alone to quickly reduce wrinkles and odor in fabrics. It brings new life to wrinkled clothes that have been stored for an extended time and makes heavily wrinkled clothes easier to iron. SteamFresh™ can also be used to help reduce odors in fabrics.

To Use the SteamFresh™ Cycle:

1 Turn on the washer and turn the cycle selector knob to select the SteamFresh™
2 cycle.

Load up to 5 items and close the door.

NOTE: If there is any moisture inside the drum, such as from a previous wash cycle, wipe the drum dry with a towel before

3 adding clothes.

Press the STEAM button until the correct number of items is shown in the display.

4 No other options need to be set.

Press the START/PAUSE button to start the cycle.

After the SteamFresh™ cycle is complete, the washer will tumble the clothes for up to 30 minutes to prevent rewrinkling.

After removing clothes from the SteamFresh™ cycle, they may feel slightly damp. Place clothes on a hanger for at least 10 minutes to allow them to dry.

  • The SteamFresh™ cycle is not recommended for use with 100% cotton clothing.
  • Remove stains from clothing before using the SteamFresh™ cycle; the high heat could cause stains to set permanently.
  • Do not use SteamFresh™ with the following items: wool, blankets, leather jackets, silk, wet clothes, lingerie, foam products, or electric blankets.
  • Best results are achieved when articles are of similar size and fabric type. Do not overload.

CYCLE SETTING BUTTONS

Each cycle has preset settings that are selected automatically. You may also customize the settings using the cycle setting buttons. Press the button for that option to view and select other settings.

The washer automatically adjusts the water level for the type and size of wash load for best results and maximum efficiency. It may seem there is no water inside the drum in some cycles, but this is normal.

NOTE: To protect your garments, not every wash/ rinse temperature, spin speed, soil level, or option is available with every cycle. See the Cycle Guide for details.

WASH/RINSE

WASH/RINSE

Selects the wash and rinse temperature combination for the selected cycle. Press the WASH/RINSE button repeatedly to scroll

through available settings.

  • Your washer features a heating element to boost the hot water temperature for Extra Hot settings. This provides improved wash performance at normal water heater settings.
  • Select the water temperature suitable for the type of load you are washing. Follow the fabric care label for best results.
  • Warm rinses leave the loads drier than cold rinses. Warm rinses can increase wrinkling.
  • In cold climates, a warm rinse makes the load more comfortable to handle.
  • Cold rinses use less energy.

SOIL LEVEL

SOIL LEVEL

Adjusts the selected cycle to allow more time for heavily soiled clothes or less time for lightly soiled clothes.

SPIN SPEED

SPIN SPEED

The washer drum spins at up to 1,300 RPM. This reduces drying time and saves energy.

Press the SPIN SPEED button to

select the maximum spin speed. Some fabrics, such as delicates, require a slower spin speed.

The Drain & Spin cycle:

The Spin Speed button also activates the Drain & Spin cycle to drain the tub and spin clothes; for example, if you want to remove clothes before the cycle has ended.

To activate the DRAIN & SPIN cycle:

1 Press the ON/OFF button to turn on the washer.
2 Press the SPIN SPEED button.
3 Select the desired spin speed. NOTE: If NO SPIN is selected, the washer will drain only.
4 Press the START/PAUSE button.

BEEPER

BEEPER

Adjusts the volume of the end-of-cycle beeper, or turns it off.

LG F1354FDS - BEEPER - 1

natural_image Silhouette of a black long-sleeve top hanging on a white hanger (no text or symbols)

SPECIAL FUNCTION BUTTONS

Your Steam Washer ^™ features several additional cycle options to customize cycles to meet your individual needs. Certain option buttons also feature a special function (see the following page for details) that can be activated by pressing and holding that option button for 3 seconds.

To Add Cycle Options to a Cycle:

1 Turn on the washer and turn the cycle selector knob to select the desired cycle.
2 Use the cycle setting buttons to adjust the settings for that cycle.
3 Press the cycle option button(s) for the option you would like to add. The cycle option buttons will light when selected.
4 Press the START/PAUSE button to start the cycle. The washer will start automatically.

NOTE: To protect your garments, not every wash/ rinse temperature, spin speed, soil level, or option is available with every cycle. See the Cycle Guide for details.

STEAm

LG F1354FDS - STEAm - 1

Use the STEAM button to add steam to the cycle for extra cleaning power and improved efficiency. See Steam Cycles

section for additional details.

NOTE: Not all cycles can be used with the STEAM option.

DELAY WASH

LG F1354FDS - DELAY WASH - 1

Once you have selected the cycle and other settings, press this button to delay the start of the wash cycle. Each press of the

button increases the delay time by one hour, up to 19 hours.

CUSTOM Pgm

LG F1354FDS - CUSTOM Pgm - 1

Use the CUSTOM PGM button to select the course that you has been saved by "PGM SAVE".

WATER PLUS

LG F1354FDS - WATER PLUS - 1

Select this option to add extra water to the wash and rinse cycles for superior results, especially with large or bulky items.

EXTRA RINSE

LG F1354FDS - EXTRA RINSE - 1

This option will add an extra rinse cycle to the selected cycle. Use this option to help ensure the removal of detergent or bleach

residue from fabrics.

RINSE+SPIN

LG F1354FDS - RINSE+SPIN - 1

Select this option to rinse and spin a load separately from a regular cycle. This can be helpful in preventing fresh stains from

setting in fabrics.

To activate the Rinse+Spin cycle:

1 Press the ON/OFF button to turn on the washer.
2 Press the RINSE+SPIN button.
3 Press the START/PAUSE button.

WASH/RINSE OPTIMIZER ^m

LG F1354FDS - WASH/RINSE OPTIMIZER ^m - 1

This function can adjust washing & rinsing time efficiently with checking the level of detergent and degree of hardness.

1 Excessive detergent amount: rinsing cycle increase.
2 Insufficient detergent amount: washing time increase.
3 A small amount of remaining detergent detected, additional rinsing will be added.

PRE-WASH

LG F1354FDS - PRE-WASH - 1

Adds 16 minutes prewash and a spin cycle.

CUSTOM PROGRAM

LG F1354FDS - CUSTOM PROGRAM - 1

CUSTOM PROGRAM allows you to store a customized wash cycle for future use. It allows you to save favorite temperature, spin

speed, soil level, and other options for a cycle, and then recall them at the touch of a button.

To store a Custom Program:

1 Select a cycle.
2 Adjust the Wash/Rinse Temperature, Spin Speed, and Soil Level to the desired settings.
3 Set any other desired options.
4 Press and hold the CUSTOM PROGRAM button for 3 seconds. You will hear two beeps to confirm the settings have been stored.

SECONDARY FUNCTIONS

The special function buttons also activate secondary functions, including CHILD LOCK, DRUM LIGHT, and TUB CLEAN. Press and hold the button marked with the secondary function for 3 seconds to activate.

CHILD LOCK

LG F1354FDS - CHILD LOCK - 1

Use this option to prevent unwanted use of the washer or to keep cycle settings from being changed while the washer is

operating. Press and hold the PRE WASH button for 3 seconds to activate or deactivate CHILD LOCK.

CHILD LOCK will be shown in the display, and all controls are disabled. The washer can be locked during a cycle.

DRUM LIGHT

LG F1354FDS - DRUM LIGHT - 1

The drum is equipped with a blue LED light that illuminates when the washer is turned on. This light automatically turns off when

the door is closed and the cycle starts. To turn on the light during a cycle, press and hold the RINSE+SPIN button for 3 seconds. The drum light will illuminate and then turn off automatically after 4 minutes.

IMPORTANT: If you press and hold the CUSTOM PROGRAM button for 3 seconds, you will overwrite any previously stored CUSTOM PROGRAM.

To recall a Custom Program:

1 Press and release the CUSTOM PROGRAM button. The stored settings will be displayed.
2 Press and release the START/PAUSE button to start the cycle. The washer will start automatically.

TUB CLEAN

LG F1354FDS - TUB CLEAN - 1

A buildup of detergent residue can occur in the wash tub over time and can lead to a mildewy or musty smell. The TUB CLEAN

cycle is specially designed to remove this buildup. The display will show a message to add liquid bleach to the dispenser. Prewash option will be selected. After the cycle has ended, open the door and allow the drum interior to dry completely.

Refer to Care and Cleaning of the Interior for further information.

NOTE: Do NOT use this cycle with clothes, and do NOT add detergent or fabric softener.

NOTE: If you use the TUB CLEAN cycle on a monthly basis, the wash drum will be kept clean.

SPECIAL CARE CYCLES

ALLERgiENE™

The ALLERGIENE™ cycle is a powerful, high temperature cycle designed specifically to reduce certain allergens.

  • Selecting the ALLERGIENE™ cycle automatically incorporates steam into the wash cycle.
  • The ALLERGIENE™ cycle can significantly reduce allergens in bedding and clothing.
  • The ALLERGIENE™ cycle helps reduce dust mite populations and helps reduce allergens.
  • Due to the higher energy and temperatures used, the ALLERGIENE™ cycle is not recommended for wool, silk, leather, or any other delicate or temperature sensitive items.

HAND WASH/WOOL

LG F1354FDS - HAND WASH/WOOL - 1

  • Only woolen items that are designated as “Machine-Washable” should be washed in this washing machine
  • Wash only small loads for optimum fabric care (less than 8 lbs.)
  • Only neutral (wool safe) detergents should be used (Only a small quantity of detergent is needed due to the small load size and low volume of water in the cycle.)
  • The HANDWASH/WOOL cycle uses a gentle tumble action and low speed spin for ultimate fabric care

LG F1354FDS - HAND WASH/WOOL - 2
WOOLMARK

The wool wash cycle of this machine has been approved by Woolmark for the washing of machine washable Woolmark products provided that the products are washed according to the instructions on the garment label and those issued by the manufacturer of this washing machine, M0807

LG F1354FDS - HAND WASH/WOOL - 3

Certifi ed by NSF Certifi cado por NSF

NSF International (formerly the National Sanitation Foundation), certifies that SANITARY cycle reduces 99.9% of bacteria on laundry, and none of bacteria will carry over onto the next laundry load.

REGULAR CLEANING

⚠ WARNING:

  • Unplug the washer before cleaning to avoid the risk of electric shock. Failure to follow this warning can cause serious injury, fire, electrical shock, or death.
  • Never use harsh chemicals, abrasive cleaners, or solvents to clean the washer.

They will damage the finish.

Cleaning the Exterior

Proper care of your washer can extend its life. The outside of the machine can be cleaned with warm water and a mild, nonabrasive household detergent.

Immediately wipe off any spills with a soft, damp cloth.

IMPORTANT: Do not use methylated spirits, solvents, or similar products.

Never use steel wool or abrasive cleansers; they can damage the surface.

Care and Cleaning of the Interior

Use a towel or soft cloth to wipe around the washer door opening, door seal, and door glass. These areas should be kept clean to ensure a watertight seal. Be sure to wipe under the inside rubber seal to remove any moisture or soil.

Always remove items from the washer as soon as the cycle is completed. Leaving damp items in the washer can cause wrinkling, color transfer, and odor.

Run the TUB CLEAN cycle regularly to remove detergent buildup and other residue.

This washer has a special cycle, TUB CLEAN, to remove inside buildup of detergent residue which can occur in the wash tub or drum and lead to mildew or musty smell.

Read these instructions carefully before beginning the TUB CLEAN cycle.

1 Open the door and remove any clothing in the wash drum.
2 Open the dispenser drawer.
3 Add liquid chlorine bleach or tub cleaner.

Some powder or tablet tub cleaners which are manufactured for this purpose can be used.

(NOTE : Do not add any laundry detergent or fabric softener to the drawer when using TUB CLEAN.)

- If using liquid chlorine bleach

Add liquid chlorine bleach to the bleach compartment of the drawer.

(NOTE : Do not exceed the maximum fill line and do not pour undiluted liquid bleach directly into the wash drum.)

- If using powder cleaner

Remove the liquid detergent cup and add powder cleaner to the main wash compartment of the drawer.

- If using tablet cleaner

Add tablet cleaner to the wash drum directly. (NOTE : Do not add tablet cleaner to the drawer.)

Close the drawer and washer door.

5 Select TUB CLEAN and press START.

NOTE : It is recommended that TUB CLEAN should be repeated monthly.

If mildew or musty smell already exists, run TUB CLEAN for 3 consecutive weeks.

After TUB CLEAN is complete or when the washer is not used, leave the washer door open for better ventilation and drying inside of the washer.

REGULAR CLEANING (cont.)

Cleaning the Steam and Water Circulation Nozzles

Use a cotton swab to remove lime or detergent buildup from the inside of the steam and water circulation nozzles. NEVER use a sharp or pointed object; you could damage the nozzles.

Removing the Stain in Door Seal

NOTE: Wear rubber gloves and eye protection while performing the following procedure:

1 lute 3/4 cup (177 ml) liquid chlorine bleach with 1 gallon (3.8 L) of warm/hot water.
2 Use this solution to wipe down all surfaces of the gasket to remove the deposits that are causing any odor. (Be sure to fold back the lip of the gasket to get under the edge where residue can build up.)
3 Wipe the gasket with a dry cloth.
4 Leave the door open to allow the gasket to dry completely.

Do not use undiluted bleach as this will damage the gasket. Follow the manufacturer's instructions for proper use of bleach. If the gasket cannot be cleaned properly, it should be replaced.

Storing the Washer

If the washer will not be used for an extended period of time and is in an area that could be exposed to freezing temperatures:

1 Turn off water supply tap.
2 Disconnect hoses from water supply and drain water from hoses.
3 Plug the power cord into a properly grounded electrical outlet.
4 Add 1 gallon of nontoxic recreational vehicle (RV) antifreeze to the empty wash drum. Close door.
5 Select the spin cycle and let washer spin for 1 minute to drain out all the water. NOTE: Not all of the RV antifreeze will be expelled.
6 Unplug the power cord, dry the drum interior with a soft cloth, and close the door.
7 Remove the inserts from the dispenser. Drain any water in compartments and dry the compartments.
8 Store the washer in an upright position.
9 To remove the antifreeze from the washer after storage, run washer through a complete cycle using detergent. Do not add laundry!

Removing Lime Buildup

If you live in an area with hard water, lime scale can form on internal components of the washer. Use of a water softener is recommended in areas with hard water. If a descaler is used, make sure that it is suitable for use in a washer, and run the TUB CLEAN cycle before washing clothing.

Lime scale and other spots may be removed from the stainless steel drum using a stainless steel cleaner. Do NOT use steel wool or abrasive cleansers; they can damage the surface.

Notice of tub clean activation

To clean up the tub, please select the tub clean course. Please empty the tub and insert bleach into the detergent dispenser and push the tub clean button.

It is recommended that you should leave the door open after getting finished with laundry to keep the tub clean.

CLEANING THE WASHER

Cleaning the Dispenser

The dispenser should be cleaned periodically to remove buildup from detergent and other laundry products.

LG F1354FDS - Cleaning the Dispenser - 1

natural_image Line drawing of a microwave oven with a drawer and control panel (no text or symbols)

1 Pull out the dispenser drawer until it stops. Press the button in the center of the drawer and pull to remove the drawer.

NOTE: If you clean the detergent dispenser once a week, it will always dispense properly.

LG F1354FDS - Cleaning the Dispenser - 2

natural_image Technical line drawing of a multi-tiered cleaning or cleaning device with no visible text or symbols

2 Remove the inserts from the drawer, and clean them with warm water and a soft cloth or brush to remove any residue or buildup. Wipe out the inside of the drawer opening with a damp cloth. Reassemble the drawer and reinstall in the drawer opening.

NOTE: Do not use anything other than water to clean the drawer, inserts, and drawer opening. If any sort of household cleaner drains into the interior of the washer, run a RINSE+SPIN cycle before washing clothes.

mAINTENANCE

Cleaning the Water Inlet Filters

If the washer detects that water is not entering the dispenser, an error message will show on the display. If you live in an area with hard water, this may be caused by clogged inlet filters.

IMPORTANT: Use extreme care when removing and cleaning the filters. If the filters cannot be cleaned or are damaged, do NOT operate the washer without the inlet filters. Contact LG Customer Service or a qualified LG servicer.

LG F1354FDS - Cleaning the Water Inlet Filters - 1

natural_image Line drawing of a device rear panel with hoses and a control knob (no text or symbols)

1 Turn off both water taps completely. Unscrew the hot and cold water lines from the back of the washer.

IMPORTANT: Use ONLY the inlet hoses provided by LG with this laundry product. Aftermarket hoses are not guaranteed to fit or function correctly. Other hoses may not tighten correctly and could cause leaks. Subsequent damage to product or property will not be covered under the terms of LG's warranty.

LG F1354FDS - Cleaning the Water Inlet Filters - 2

text_image Inlet Filter

2 Carefully remove the filters from the water inlets, and soak them in white vinegar or a lime scale remover, following the manufacturer's instructions. Rinse thoroughly before reinstalling.

Press the filters back into place and reattach the water lines. Do NOT operate the washer without the inlet filters.

MAINTENANCE (cont.)

Cleaning the Drain Pump Filter

Lint and other objects may accumulate and clog the drain pump filter. If the washer fails to drain properly, unplug the washer and allow the water to cool, if necessary, before proceeding.

LG F1354FDS - Cleaning the Drain Pump Filter - 1

natural_image Line drawing of a hand pressing down on a door panel with a black arrow indicating the action (no text or symbols)

1 Open the drain pump filter access panel.

LG F1354FDS - Cleaning the Drain Pump Filter - 2

text_image Drain Hose

2 Unclip the drain hose and pull it out. Place the end of the drain hose in a pan, bucket, or floor drain to catch water.

LG F1354FDS - Cleaning the Drain Pump Filter - 3

text_image Plug Pump Filter

3 Remove the plug from the drain hose, and allow the water to drain completely.

Twist the pump filter counterclockwise to remove. Remove any lint and foreign objects from the pump filter.

Reverse the above steps to reinstall the drain pump filter and drain hose. Be sure to close the cover panel when finished.

NORMAL SOUNDS YOU MAY HEAR

The following sounds may be heard while the washer is operating. They are normal.

Clicking:

Door lock relay when the door locks and unlocks.

Spraying or hissing:

Steam or water spraying or circulating during the cycle.

Humming or gurgling:

Drain pump pumping water from the washer at the end of a cycle.

Splashing:

Clothes tumbling in the drum during the wash and rinse cycles.

BEFORE CALLING FOR SERVICE

Your Steam Washer ^™ is equipped with an automatic error-monitoring system to detect and diagnose problems at an early stage. If your washer does not function properly or does not function at all, check the following before you call for service.

Problem Possible Causes Solutions
Rattling and clanking noise·Foreign objects, such as keys, coins, or safety pins, may be in drum or pump.·Stop washer and check drum and drain fi lter for foreign objects. If noise continues after washer is restarted, call for service.
Thumping sound·Heavy wash loads may produce a thumping sound.·Washer load may be out of balance.·This is normal. If sound continues, washer is probably out of balance. Stop and redistribute wash load.·Stop and redistribute wash load.
Vibrating noise·Shipping bolts and/or packaging materials not removed.·Wash load may be unevenly distributed in the drum.·Not all leveling feet are resting fi rmly on the fl oor.·Floor not rigid enough.·See Installation Instructions for removing shipping bolts and packaging.·Stop washer and rearrange wash load.·Adjust the leveling feet. Make sure all four feet are in fi rm contact with the fl oor while the washer is in the spin cycle with a load.·Make sure that the fl oor is solid and does not fl ex. Refer to “Flooring” in the Installation section.
Water leaking around washer·Fill hose connection is loose at tap or washer.·House drain pipes are clogged.·Check hoses. Check and tighten hose connections.·Unclog drain pipe. Contact a plumber if necessary.
Excessive sudsing·Too much detergent or incorrect detergent.·Reduce detergent amount or use low-sudsing detergent.Only use detergent with the HE (High-Effi ciency) logo.
Staining·Laundry products added directly to the washer drum.·Washer not unloaded promptly.·Clothes not sorted properly.·Load the laundry products into the dispenser.·Always remove items from the washer as soon as the cycle is completed.·Always wash dark colors separately from light colors and whites to prevent discoloration. If possible, do not wash heavily soiled items with lightly soiled ones.

BEFORE CALLING FOR SERVICE (cont.)

Problem Possible Causes Solutions
Water in the washer drains slowly or not at all, or the display shows:LG F1354FDS - BEFORE CALLING FOR SERVICE (cont.) - 1Drain hose is bent, pinched, or clogged.The drain filter is clogged.Make sure the drain hose is free of clogs, kinks, etc., and is not pinched behind or under the washer.Clean the drain filter. See theCare and Cleaning section.
Washer fills with water slowly or not at all, or the display shows:LG F1354FDS - BEFORE CALLING FOR SERVICE (cont.) - 2Water supply taps are not open fully.Water line hoses are kinked, pinched, or bent.Water inlet filters are clogged.Water pressure to tap or house is too low.Make sure that the water taps are open fully.Make sure the hoses are not kinked or pinched. Be careful when moving the washer.Clean the inlet filters. See theCare and Cleaning section.Check another faucet in the house to make sure that household water pressure is adequate.
Washer will not turn onPower cord is not properly plugged in.House fuse is blown, circuit breaker has tripped, or power outage has occurred.Make sure that the plug is plugged securely into a grounded, 3-prong, 120-VAC, 60-Hz. outlet.Reset circuit breaker or replace fuse. Do not increase fuse capacity. If the problem is a circuit overload, have it corrected by a qualified electrician.
Washer won't spin, or the display shows:LG F1354FDS - BEFORE CALLING FOR SERVICE (cont.) - 3The door is not closed properly.Make sure that the door is closed properly and press the START/PAUSE button. After starting a cycle, it may take a few moments before the drum begins to turn or spin. The washer will not spin unless the door is locked (DOOR LOCK will appear in the display).If the door is closed and locked and the open door error message is displayed, call for service.
Door will not unlock when cycle is stopped or pausedInterior temperature of washer is too high.Water level in washer is too high.The washer door has a safety lock to prevent burns. Allow the washer to cool until the DOOR LOCK indicator turns off in the display.Allow the washer to complete the programmed cycle, or run the DRAIN & SPIN cycle to drain the water.
Wash cycle time is longer than usualThe washer automatically adjusts the wash time for the amount of laundry, water pressure, water temperature, and other operating conditions.This is normal. The washer adjusts cycle time automatically to provide optimal results for the selected cycle.
Musty or mildewy odor in washerIncorrect or too much detergent has been used.Inside of tub not cleaned properly.Use only HE (High-Efficiency) detergent in accordance with the manufacturer's instructions.Run the TUB CLEAN cycle regularly. Be sure to wipe around and under the door seal frequently.Clean around door seal/glass to prevent odor or mildew:1. wipe dry the door seal/glass and the door opening area2. wipe around the inner drum/door seal and the lower door seal
Steam is not visible during STEAM cycleThis is normal.Because it uses pressurized steam, the washer requires very small amounts of steam to achieve optimal results. Excess steam could damage fabrics and reduce efficiency.

BEFORE CALLING FOR SERVICE (cont.)

Problem Possible Causes Solutions
WrinklingWasher not unloaded promptly.Washer overloaded.Hot and cold water inlet hoses are reversed.Always remove items from the washer as soon as the cycle is completed.The washer can be fully loaded, but the drum should not be tightly packed with items. The door of the washer should close easily.Hot water rinse can set wrinkles in garments. Check the inlet hose connections.
Drum light does not stay onThis is normal.The drum light shuts off automatically when the washer starts. Press and hold the RINSE+SPIN button for 3 seconds to turn on the light; it will turn off automatically after 4 minutes.
The display shows: LG F1354FDS - BEFORE CALLING FOR SERVICE (cont.) - 1Load is too small.Load is out of balance.The washer has an imbalance detection and correction system. If individual heavy articles are loaded (bath mat, bath robe, etc.) and the imbalance is too great, the washer will make several attempts to restart the spin cycle. If an imbalance is still detected, the washer will stop and the error code will be displayed.Add 1 or 2 similar items to help balance the load.Rearrange items to help balance the load.
The display shows: LG F1354FDS - BEFORE CALLING FOR SERVICE (cont.) - 2Control error.Unplug the washer and call for service.
The display shows: LG F1354FDS - BEFORE CALLING FOR SERVICE (cont.) - 3Water level is too high due to a faulty water valve.Close the water taps, unplug the washer, and call for service.
The display shows: LG F1354FDS - BEFORE CALLING FOR SERVICE (cont.) - 4The water level sensor is not working correctly.Close the water taps, unplug the washer, and call for service.
The display shows: LG F1354FDS - BEFORE CALLING FOR SERVICE (cont.) - 5Thermal overload protection circuit in the motor has been tripped.Allow the washer to stand for 30 minutes to allow the motor to cool; then restart the cycle. If the LE error code still appears, unplug the washer and call for service.
The display shows: LG F1354FDS - BEFORE CALLING FOR SERVICE (cont.) - 6A power failure has occurred.Restart the cycle.
Remote Laundry Monitor (optional accessory) not working properlyRefer to the instruction manual for the Remote Laundry Monitor.Refer to the instruction manual for the Remote Laundry Monitor.

SPECIFICATADINGNSPTOWNADNACEASCCRIESORIE

KEY DIMENSIONS AND SPECIFICATIONS

The appearance and specifications listed in this manual may vary due to constant product improvements.

Steam WasherTM Model WM2801H*A
Description Front-Loading Washer
Electrical Requirements120 VAC @ 60 Hz.
Max. Water Pressure 14.5~116 PSI (100~800 kPa)
Dimensions 27"(W) X 2968.6 cm (W) X 75.6 cm (D) ^3/_4 "(D) X 38^11/_16 "(H), 51"(D with door open)X 98.3 cm (H), 129.7 cm (D with door open)
Net Weight 208.6 lbs. (94.6 kg)
Max. Spin Speed 1,300 RPM

OPTIONAL ACCESSORIES

For these and other LG products, contact your local LG dealer, or visit our Web site at us.lge.com.

LG F1354FDS - OPTIONAL ACCESSORIES - 1

natural_image Line drawing of a square electronic device casing with a lid and mounting holes (no text or symbols)

Pedestal

Give your LG washer and dryer a boost with matching 14-inch high pedestals.

They feature a storage drawer for added convenience.

14" Pedestal Color

WDP3WWhite
WDP3RWild Cherry Red
WDP3LRIVIERA Blue

LG F1354FDS - Pedestal - 1

Stacking Kit

If space is at a premium, use this kit to securely stack your LG front-load washer and dryer.

Bracket KitColor
WSTK1White
RSTK1Wild Cherry Red
NSTK1RIVIERA Blue

LG ELECTRONICS, INC. LG WASHING MACHINE LIMITED WARRANTY - USA

LG F1354FDS - LG ELECTRONICS, INC. LG WASHING MACHINE LIMITED WARRANTY - USA - 1

Your LG Washing Machine will be will repaired or replaced, at LG's option, if it proves to be defective in material or workmanship under normal use, during the warranty period ("Warranty Period") set forth below, effective from the date ("Date of Purchase") of original consumer purchase of the product. This warranty is good only to the original purchaser of the product and effective only when used in the United States, including Alaska, Hawaii, and U.S. Territories.

WARRANTY PERIOD:

LABOR: One Year from the Date of Purchase.

PARTS (except as listed below): One Year from the Date of Purchase.

Electronic Control Board: Two Years from the Date of Purchase.

Drum Motor(Stator, Rotor, Hall Sensor)

: Ten Years from the Date of Purchase.

Stainless Steel Drum: Lifetime

Replacement Units and Repair Parts may be new or remanufactured.

Replacement Units and Repair Parts are warranted for the remaining portion of the original unit's warranty period.

HOW SERVICE IS HANDLED:

In-Home Service:

Please retain dealer's dated bill of sale or delivery ticket as evidence of the Date of Purchase for proof of warranty, and submit a copy of the bill of sale to the service person at the time warranty service is provided.

Please call 1-800-243-0000 and choose the appropriate option to locate your nearest LG Authorized Service Center.

Or visit our Web site at: http://www.lgservice.com.

THIS WARRANTY IS IN LIEU OF ANY OTHER WARRANTY, EXPRESS OR IMPLIED, INCLUDING WITHOUT LIMITATION, ANY WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. TO THE EXTENT ANY IMPLIED WARRANTY IS REQUIRED BY LAW, IT IS LIMITED IN DURATION TO THE EXPRESS WARRANTY PERIOD ABOVE.

NEITHER THE MANUFACTURER NOR ITS U.S. DISTRIBUTOR SHALL BE LIABLE FOR ANY INCIDENTAL, CONSEQUENTIAL, INDIRECT, SPECIAL, OR PUNITIVE DAMAGES OF ANY NATURE, INCLUDING WITHOUT LIMITATION, LOST REVENUES OR PROFITS, OR ANY OTHER DAMAGE WHETHER BASED IN CONTRACT, TORT, OR OTHERWISE. Some states do not allow the exclusion or limitation of incidental or consequential damages or limitations on how long an implied warranty lasts, so the above exclusion or limitation may not apply to you. This warranty gives you specific legal rights and you may also have other rights that vary from state to state.

THIS LIMITED WARRANTY DOES NOT APPLY TO:

  • Service trips to your home to deliver, pick up, and/or install the product, instruct, or replace house fuses or correct wiring, or correction of unauthorized repairs.
  • Damages or operating problems that result from misuse, abuse, operation outside environmental specifications or contrary to the requirements of precautions in the Operating Guide, accident, vermin, fire, flood, improper installation, acts of God, unauthorized modification or alteration, incorrect electrical current or voltage, or commercial use, or use for other than intended purpose.

The cost of repair or replacement under these excluded circumstances shall be borne by the consumer.

CUSTOMER INTERACTIVE CENTER NUMBERS

To obtain Customer Assistance, Product Information, or Dealer or Authorized Service Center location:

Call 1-800-243-0000 (24 hours a day, 365 days a year), and select the appropriate option from the menu.

Or visit our Web site at: http://www.lgservice.com.

TO CONTACT LG ELECTRONICS BY MAIL:

LG Customer Interactive Center

P. O. Box 240007

201 James Record Road

Huntsville, Alabama 35824

ATTN: CIC

LG ELECTRONICS, INC. LG WASHING MACHINE LIMITED WARRANTY - CANADA

Visit our web site: www.LG.ca

LG Electronics Canada, Inc.

LIMITED WARRANTY

Should your product prove to be defective in materials or workmanship under normal use during the warranty period listed below, which warranty period runs from the original date of purchase, LG Electronics will, at its option, repair or replace the product at no charge to you.

The warranty is valid only to the original purchaser of the product, during the warranty period, as long as it is in Canada.

LG Washing Machine Warranty Period

ComponentsPartsLabour
All Parts1 Year1 Year (In-Home Service)
Controller3 Years1 Year (In-Home Service)
Drum Tub5 Years1 Year (In-Home Service)
DD Motor (Stator, Rotor,Hall sensor)10 Years1 Year (In-Home Service)

No other warranty is applicable to this product. THE DURATION OF ANY IMPLIED WARRANTIES, INCLUDING THE IMPLIED WARRANTY OF MERCHANTABILITY, IS LIMITED TO THE DURATION OF THE EXPRESS WARRANTY HEREIN. LG ELECTRONICS SHALL NOT BE LIABLE FOR THE LOSS OF USE OF THE PRODUCT, INCONVENIENCE, LOSS, OR ANY OTHER DAMAGES, DIRECT OR CONSEQUENTIAL, ARISING OUT OF THE USE OF OR INABILITY TO USE, THIS PRODUCT OR FOR ANY BREACH OF ANY EXPRESS OR IMPLIED WARRANTY, INCLUDING THE IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, APPLICABLE TO THIS PRODUCT.

Some Provinces or Territories do not allow for the exclusion or limitation of incidental or consequential damages or limitations on how long an implied warranty lasts; so these limitations or exclusions may not apply to you. This warranty gives you (the original purchaser) specific legal rights and you may also have other rights, which vary from province to province or territory to territory.

THE ABOVE WARRANTY DOES NOT APPLY TO:

  1. Service trips to your home to deliver and pickup, install, instruct or replace house fuses, or connect house wiring or plumbing, or correction of unauthorized repairs.
  2. Damage to the product caused by accident, pest, fire, floods, or acts of God.
  3. Repairs when your LG product is used in other than normal, single-family household use or contrary to the instructions outlined in the product's owners manual.
  4. Damage resulting from accident, alteration, misuse, abuse, or improper installation or maintenance.
  5. Products with altered or removed serial numbers.

If the product is installed outside the normal service area, any cost of transportation involved in the repair of the product, or the replacement of a defective part, shall be borne by you (the owner).

CUSTOMER ASSISTANCE INFORMATION:

To obtain Warranty Coverage:Retain your Bill of Sale to prove the date of purchase.A copy of your Sales Receipt must be submitted when warranty service is provided.This warranty is invalid if the factory applied serial number has been altered or removed from the product.
To obtain Product or Customer Service Assistance:Call 1-888-LG-CANADA (542-2623)Press the appropriate menu option, and have your product model and serial numbers and your postal code ready.
To obtain the nearest Authorized Service Center:Access our web-site at: www.LG.ca (Service Option) or Call 1-888-LG-CANADA (542-2623)Press the appropriate menu option, have your product model & serial numbers & your postal code ready.
natural_image Silhouette of a clothes hanger with a cloth and a spray bottle beside it (no text or symbols)

LEA TODAS LAS INSTRUCCIONES ANTES DE USAR

text_image Labeled diagram of a washing machine showing numbered parts for identification

PIEzaS Y COMPONENTES CLave

text_image Diagram of a front-loading washing machine with labeled parts including fan, door, and buttons
text_image 29¾" (75,6 cm) 4" (10 cm)
natural_image Simple black icon of a washing machine with a square button and circular handle (no text or symbols)

LG F1354FDS - PIEzaS Y COMPONENTES CLave - 1

natural_image Silhouette of a black long-sleeve top hanging on a hanger (no text or symbols)
natural_image Line drawing of a washing machine interior showing the drain and control panel (no text or symbols)
natural_image Line drawing of a multi-tiered appliance drawer with compartments and handle (no text or symbols)
natural_image Line drawing of a device rear panel with two cables and a switch, no text or symbols present
natural_image Line drawing of a hand pressing down on a door panel with a black arrow indicating downward motion (no text or symbols)
natural_image Line drawing of a rectangular box with a recessed top and side panels (no text or symbols)

Pedestal

LG Customer Interactive Center

P. O. Box 240007

201 James Record Road

Huntsville, Alabama 35824

ATTN: CIC

INSTRUCTIONS IMPORTANTES DE SÉCURITÉ

text_image Labeled diagram of a washing machine showing numbered parts for identification

PIÈCES SET CÁRACIÉRQUES

text_image Diagram of a front-loading washing machine with labeled parts including door, fan, and control panel

LG F1354FDS - PIÈCES SET CÁRACIÉRQUES - 1

natural_image Simple black icon of a washing machine with a square button and circular handle (no text or symbols)

* Press & Hold 3sec. for Extra Functions
LG F1354FDS - PIÈCES SET CÁRACIÉRQUES - 2

text_image STEAM DELAY WASH PROC#S LOAD WASING RINSE SPIN PRE-WASH RUNSE+SPIN *CHILD LOCK DRUM LIGHT 18:00 WATER PLUS WASH/RINSE OF TIMER EXTRA RUNSE *TUB CLEAN CUSTOM PGM *PGM SAVE
natural_image Silhouette of a black long-sleeve top hanging on a white hanger (no text or symbols)

LG F1354FDS - PIÈCES SET CÁRACIÉRQUES - 3

BOUTONS DE FONCTIONS ÉSPECIALS

natural_image Line drawing of a washing machine with a drawer and control panel (no text or symbols)
natural_image Line drawing of a multi-tiered cleaning or cleaning device with no text or symbols
natural_image Line drawing of a device's rear panel showing cable routing and a switch (no text or symbols)
natural_image Line drawing of a hand pressing down on a small object inside a vehicle door (no text or symbols)

S PÉC CFF ACTAD NOS NASC/CACS DESRSEST BNE SPETNO OPTIO

SPÉCIFICATIONS ET DIMENSIONS PRINCIPALES

natural_image Line drawing of a square electronic device casing with a lid and mounting points (no text or symbols)

Piédestal

LG Electronics Canada, Inc.

GARANTIE LIMITÉ E

Table of contents Click a title to access it
Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : LG

Model : F1354FDS

Category : Washing machine