ELECTROLUX EVM6E46Z - Electric oven

EVM6E46Z - Electric oven ELECTROLUX - Free user manual and instructions

Find the device manual for free EVM6E46Z ELECTROLUX in PDF.

📄 216 pages English EN Download 💬 AI Question 10 questions ⚙️ Specs
Notice ELECTROLUX EVM6E46Z - page 28
Pick your language and provide your email: we'll send you a specifically translated version.
Product type Built-in electric oven with microwave
Brand Electrolux
Model EVM6E46Z
Dimensions (H x W x D) 455 x 595 x 567 mm (appliance); built-in: 444 x 560 x 546 mm
Depth with open door 882 mm
Capacity Approximately 40 L
Weight Approximately 35 kg
Power supply 230 V, 50 Hz, single-phase
Power cable length 1500 mm
Microwave power 100 to 1000 W
Cooking modes Microwave, Grill, Heating, Reheat, Defrost, Melt, Popcorn, Assisted cooking
Cavity material Enamelled stainless steel
Turntable Yes, included
Grill Yes, included (grill set)
Interior lighting Yes, replaceable bulb
Child safety Yes, Verrouil keys
Automatic shut-off Yes, based on temperature
Clock functions Timer, Cooking time, Delayed start, Counter
Cleaning Manual, soft cloth and mild detergent; do not use steam cleaner
Spare parts available Turntable, grill, bulb, turntable support
Repairability Authorized after-sales service; use original parts

Frequently Asked Questions - EVM6E46Z ELECTROLUX

How to set the current time on the Electrolux EVM6E46Z oven?
Access the menu by pressing the OK button, select Settings, then Current time. Turn the control knob to set the time and confirm with OK.
What accessories are provided with the oven?
The oven is supplied with a glass turntable with a roller support, a grill set (grill with silicone caps) and a glass plate for the turntable.
How to use the grill function?
Turn the cooking modes knob to Grill, then press OK to start. You can adjust the duration and power if necessary. Use the provided grill set.
What types of containers are suitable for microwave?
Use containers made of heat-resistant glass, metal-free porcelain, plastic suitable up to 200°C or paper/cardboard. Avoid metal and items with metallic reflections.
How to clean the oven after use?
Clean the cavity with a soft cloth, warm water and a mild detergent. Do not use a steam cleaner, abrasive products or metal objects. Wash accessories by hand.
What to do if the oven does not heat?
Check that the oven is on, that the fuse has not blown, that the lock is deactivated and that the door is properly closed. If the problem persists, contact after-sales service.
How to activate child safety?
Press and hold the Verrouil key until a sound signal is heard. The control panel is then locked. To deactivate, press and hold the key again.
What is the maximum continuous operating time?
The oven switches off automatically after 12.5 hours if the temperature is between 30 and 115°C, 8.5 hours between 120 and 195°C, and 5.5 hours between 200 and 230°C.
How to replace the interior bulb?
Make sure the oven is off and unplugged. Replace the bulb with one of the same specification. Contact authorized after-sales service if necessary.
Can I use the microwave function to preheat the oven?
No, the microwave function should not be used to preheat the oven. Use standard cooking modes like grill for that.

User questions about EVM6E46Z ELECTROLUX

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Electric oven in PDF format for free! Find your manual EVM6E46Z - ELECTROLUX and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. EVM6E46Z by ELECTROLUX.

USER MANUAL EVM6E46Z ELECTROLUX

WE'RE THINKING OF YOU

Thank you for purchasing an Electrolux appliance. You've chosen a product that brings with it decades of professional experience and innovation. Ingenious and stylish, it has been designed with you in mind. So whenever you use it, you can be safe in the knowledge that you'll get great results every time.

Welcome to Electrolux.

Visit our website to:

ELECTROLUX EVM6E46Z - WE'RE THINKING OF YOU - 1

Get usage advice, brochures, trouble shooter, service and repair information: www.electrolux.com/support

ELECTROLUX EVM6E46Z - WE'RE THINKING OF YOU - 2

Register your product for better service: www.registerelectrolux.com

ELECTROLUX EVM6E46Z - WE'RE THINKING OF YOU - 3

Buy Accessories, Consumables and Original spare parts for your appliance: www.electrolux.com/shop

CUSTOMER CARE AND SERVICE

Always use original spare parts.

When contacting our Authorised Service Centre, ensure that you have the following data available: Model, PNC, Serial Number.

The information can be found on the rating plate.

Warning / Caution-Safety information
i General information and tips
Environmental information

Subject to change without notice.

CONTENTS

1.SAFETY INFORMATION. 29

1.1 Children and vulnerable people safety 29
1.2 General Safety 30

2.SAFETYINSTRUCTIONS. 32

2.1 Installation 32
2.2 Electrical connection 33
2.3 Use 33
2.4 Care and cleaning.. 34
2.5 Internal lighting 35
2.6 Service 35
2.7 Disposal 35

3.PRODUCT DESCRIPTION 36

3.1 General overview.. 36
3.2 Accessories 36

  1. HOW TO TURN OVEN ON AND OFF.... 37

4.1 Retractable knobs.. 37
4.2 Control panel 37

  1. BEFORE FIRST USE 38

5.1 Initial cleaning 38

6.DAILYUSE 38

6.1 How to set: Grill 38
6.2 How to set: Microwave heating functions.. 38

6.3 Heating functions 39
6.4 How to set: Assisted Cooking....40
6.5 Assisted Cooking 41

10.3 Recommended power settings for different kinds of food 47
10.4 Cooking tables for test institutes..48

  1. CLOCK FUNCTIONS 42

7.1 Clock functions 42
7.2 How to set: Clock functions.. 42

  1. CARE AND CLEANING 49
    11.1 Notes on cleaning. 49

  2. HOW TO USE: ACCESSORIES 44

8.1 Inserting accessories.. 44

  1. TROUBLESHOOTING 50

12.1 What to do if 50
12.2 Service data.. 51

  1. ADDITIONAL FUNCTIONS 45

9.1 Lock 45
9.2 Automatic switch-off 45
9.3 Cooling fan 45

  1. ENERGY EFFICIENCY 51
    13.1 Energy saving.. 51

  2. HINTS AND TIPS 45

10.1 Microwave recommendations ....45
10.2 Microwave suitable cookware and materials 46

14.MENU STRUCTURE. 52
14.1 Menu 52

  1. ENVIRONMENTAL CONCERNS. 52

1. SAFETY INFORMATION

Before the installation and use of the appliance, carefully read the supplied instructions. The manufacturer is not responsible for any injuries or damage that are the result of incorrect installation or usage. Always keep the instructions in a safe and accessible location for future reference.

1.1 Children and vulnerable people safety

  • This appliance can be used by children aged from 8 years and above and persons with reduced physical, sensory or mental capabilities or lack of experience and knowledge if they have been given supervision or instruction concerning the use of the appliance in a safe way and understand the hazards involved. Children of less than 8 years of age and persons with very extensive and complex disabilities shall be kept away from the appliance unless continuously supervised.
  • Children should be supervised to ensure that they do not play with the appliance.

  • Keep all packaging away from children and dispose of it appropriately.

  • WARNING: Keep children and pets away from the appliance when it operates or when it cools down. Accessible parts become hot during use.
  • If the appliance has a child safety device, it should be activated.
  • Children shall not carry out cleaning and user maintenance of the appliance without supervision.

1.2 General Safety

  • Only a qualified person must install this appliance and replace the cable.
  • Do not use the appliance before installing it in the built-in structure.
  • Disconnect the appliance from the power supply before carrying out any maintenance.
  • If the mains power supply cable is damaged, it must be replaced by the manufacturer, its Authorised Service Centre or similarly qualified persons to avoid an electrical hazard.
  • WARNING: Ensure that the appliance is switched off before replacing the lamp to avoid the possibility of electric shock.
  • WARNING: The appliance and its accessible parts become hot during use. Care should be taken to avoid touching heating elements.
  • Always use oven gloves to remove or put in accessories or ovenware.
  • Use only the turntable and the turntable support designed for this appliance.
  • Do not activate the microwave function when the appliance is empty. Metal parts inside the cavity can create electric arcing.
  • Metallic containers for food and beverages are not allowed during microwave cooking. This requirement is not

applicable if the manufacturer specifies size and shape of metallic containers suitable for microwave cooking.

  • WARNING: If the door or door seals are damaged, the appliance must not be operated until it has been repaired by a qualified person.
  • WARNING: Only a qualified person can carry out any service or repair operation that involves the removal of a cover which gives protection against exposure to microwave energy.
  • WARNING: Do not heat liquids and other foods in sealed containers. They are liable to explode.
  • Use only utensils that are suitable for use in microwave ovens.
  • When heating food in plastic or paper containers, observe the appliance due to the possibility of ignition.
  • The appliance is intended for heating food and beverages. Drying of food or clothing and heating of warming pads, slippers, sponges, damp cloth and similar may lead to risk of injury, ignition or fire.
  • If smoke is emitted, switch off or unplug the appliance and keep the door closed in order to stifle any flames.
  • Microwave heating of beverages can result in delayed eruptive boiling. Care must be taken when handling the container.
  • The contents of feeding bottles and baby food jars shall be stirred or shaken and the temperature checked before consumption, in order to avoid burns.
  • Eggs in their shell and whole hard-boiled eggs should not be heated in the appliance since they may explode, even after microwave heating has ended.
  • The appliance should be cleaned regularly and any food deposits removed.
  • Do not use a steam cleaner to clean the appliance.

  • Do not use harsh abrasive cleaners or sharp metal scrapers to clean the glass door since they can scratch the surface, which may result in shattering of the glass.

  • Failure to maintain the appliance in a clean condition could lead to deterioration of the surface that could adversely affect the life of the appliance and possibly result in a hazardous situation.

2. SAFETY INSTRUCTIONS

2.1 Installation

ELECTROLUX EVM6E46Z - Installation - 1

WARNING!

Only a qualified person must install this appliance.

  • Remove all the packaging.
  • Do not install or use a damaged appliance.
  • Follow the installation instructions supplied with the appliance.
  • Always take care when moving the appliance as it is heavy. Always use safety gloves and enclosed footwear.
  • Do not pull the appliance by the handle.
  • Install the appliance in a safe and suitable place that meets installation requirements.
  • Keep the minimum distance from other appliances and units.
  • Before mounting the appliance, check if the oven door opens without restraint.
  • The appliance is equipped with an electric cooling system. It must be operated with the electric power supply.
  • The built-in unit must meet the stability requirements of DIN 68930.
Cabinet minimum height (Cabinet under the work-top minimum height)444 (460) mm
Cabinet width 560 mm
Cabinet depth 550 (550) mm
Height of the front of the appliance 455 mm
Height of the back of the appliance 440 mm
Width of the front of the appliance 595 mm
Width of the back of the appliance 559 mm
Depth of the appliance 567 mm
Built in depth of the appliance 546 mm
Depth with open door 882 mm
Ventilation opening minimum size. Opening placed on the bottom rear side560x20 mm
Mains supply cable length. Cable is placed in the right corner of the back side1500 mm
Mounting screws 3.5x25 mm

2.2 Electrical connection

ELECTROLUX EVM6E46Z - Electrical connection - 1

WARNING!

Risk of fire and electric shock.

  • All electrical connections should be made by a qualified electrician.
  • The appliance must be earthed.
  • Make sure that the parameters on the rating plate are compatible with the electrical ratings of the mains power supply.
    Always use a correctly installed shockproof socket.
  • Do not use multi-plug adapters and extension cables.
  • Make sure not to cause damage to the mains plug and to the mains cable. Should the mains cable need to be replaced, this must be carried out by our Authorised Service Centre.
  • Do not let mains cables touch or come near the appliance door or the niche below the appliance, especially when it operates or the door is hot.
  • The shock protection of live and insulated parts must be fastened in such a way that it cannot be removed without tools.
  • Connect the mains plug to the mains socket only at the end of the installation. Make sure that there is access to the mains plug after the installation.
  • If the mains socket is loose, do not connect the mains plug.
  • Do not pull the mains cable to disconnect the appliance. Always pull the mains plug.
  • Use only correct isolation devices: line protecting cut-outs, fuses (screw type fuses removed from the holder), earth leakage trips and contactors.
  • The electrical installation must have an isolation device which lets you disconnect the appliance from the mains at all poles. The isolation device must have a contact opening width of minimum 3 mm.
  • This appliance is supplied with a main plug and a main cable.

2.3 Use

ELECTROLUX EVM6E46Z - Use - 1

WARNING!

Risk of injury, burns and electric shock or explosion.

  • This appliance is for household (indoors) use only.
  • Do not change the specification of this appliance.
  • Make sure that the ventilation openings are not blocked.

  • Do not let the appliance stay unattended during operation.

  • Deactivate the appliance after each use.
  • Be careful when you open the appliance door while the appliance is in operation. Hot air can release.
  • Do not operate the appliance with wet hands or when it has contact with water.
  • Do not apply pressure on the open door.
  • Do not use the appliance as a work surface or as a storage surface.
  • Open the appliance door carefully. The use of ingredients with alcohol can cause a mixture of alcohol and air.
  • Do not let sparks or open flames to come in contact with the appliance when you open the door.
  • Do not put flammable products or items that are wet with flammable products in, near or on the appliance.
  • Do not use microwave function to preheat the oven.

ELECTROLUX EVM6E46Z - WARNING! - 1

WARNING!

Risk of damage to the appliance.

  • To prevent damage or discoloration to the enamel:
  • do not put aluminium foil directly on the bottom of cavity of the appliance.
  • do not put water directly into the hot appliance.
  • do not keep moist dishes and food in the appliance after you finish the cooking.
  • be careful when you remove or install the accessories.
  • Discoloration of the enamel or stainless steel has no effect on the performance of the appliance.
  • This appliance is for cooking purposes only. It must not be used for other purposes, for example room heating.
    Always cook with the oven door closed.
  • If the appliance is installed behind a furniture panel (e.g. a door) make sure the door is never closed when the appliance operates. Heat and moisture can build up behind a closed furniture panel and cause subsequent damage to the appliance, the housing unit or the floor. Do not close the furniture panel until the appliance has cooled down completely after use.

2.4 Care and cleaning

ELECTROLUX EVM6E46Z - Care and cleaning - 1

WARNING!

Risk of injury, fire, or damage to the appliance.

  • Before maintenance, deactivate the appliance and disconnect the mains plug from the mains socket.
  • Make sure the appliance is cold. There is the risk that the glass panels can break.
  • Replace immediately the door glass panels when they are damaged. Contact the Authorised Service Centre.
  • Be careful when you remove the door from the appliance. The door is heavy!
  • Make sure the cavity, the turntable and the door are wiped dry after each use. Steam produced during the operation of the appliance condensates on cavity walls and can cause corrosion.
  • Clean regularly the appliance to prevent the deterioration of the surface material.
  • Fat and food remaining in the appliance can cause fire and electric arcing when the microwave function operates.

  • Clean the appliance with a moist soft cloth. Use only neutral detergents. Do not use abrasive products, abrasive cleaning pads, solvents or metal objects.

  • If you use an oven spray, follow the safety instructions on its packaging.

2.5 Internal lighting

ELECTROLUX EVM6E46Z - Internal lighting - 1

WARNING!

Risk of electric shock.

  • Concerning the lamp(s) inside this product and spare part lamps sold separately: These lamps are intended to withstand extreme physical conditions in household appliances, such as temperature, vibration, humidity, or are intended to signal information about the operational status of the appliance. They are not intended to be used in other applications and are not suitable for household room illumination.
  • Use only lamps with the same specifications.

2.6 Service

  • To repair the appliance contact the Authorised Service Centre.
  • Use original spare parts only.

2.7 Disposal

ELECTROLUX EVM6E46Z - Disposal - 1

WARNING!

Risk of injury or suffocation.

  • Contact your municipal authority for information on how to dispose of the appliance.
  • Disconnect the appliance from the mains supply.
  • Cut off the mains electrical cable close to the appliance and dispose of it.
  • Remove the door catch to prevent children or pets from becoming trapped in the appliance.

3.PRODUCT DESCRIPTION

3.1 General overview

ELECTROLUX EVM6E46Z - General overview - 1

1 Control panel
2 Knob for the heating functions
3 Display
4 Control knob
5 Heating element
6 Microwave generator
7 Lamp
8 Turntable shaft

3.2 Accessories

Turntable set

To prepare food.

Grill rack set

To grill.

ELECTROLUX EVM6E46Z - Accessories - 1

ELECTROLUX EVM6E46Z - Accessories - 2

4. HOW TO TURN OVEN ON AND OFF

4.1 Retractable knobs

To use the appliance press the knob. The knob comes out.

4.2 Control panel

Control panel sensor fields Press Turn the knob
WATTOK
Timer Lock LightMicrowave powerConfirm setting
Select a heating function to turn on the oven.
Turn the knob for the heating functions to the off position to turn the oven off.
12:34When the knob for the heating functions is in the off position, the display goes to standby.
88:88:88:8888h:min:s wattDisplay with key functions.
Display indicators:LockAssisted CookingSettings
Timer indicators:STOP
Progress bar - for temperature or time. The bar is fully red when the oven reaches the set temperature.

5. BEFORE FIRST USE

ELECTROLUX EVM6E46Z - BEFORE FIRST USE - 1

WARNING!

Refer to Safety chapters.

5.1 Initial cleaning

Before the first use clean the empty oven and set the time:
00:00 Set the time. Press . OK

6. DAILY USE

ELECTROLUX EVM6E46Z - DAILY USE - 1

WARNING!

Refer to Safety chapters.

6.1 How to set: Grill

Start cooking
Step 1 Step 2
Select the function: Grill.Press OK

6.2 How to set: Microwave heating functions

Step 1Select a microwave heating function and press: to start with default settings. The display shows: duration and microwave power.
Step 2 Turnthe knob for the heating functions to the off position to turn off the oven.

You can adjust settings while cooking.

Turn the control knob to adjust duration. Press: OK

Press WATT and turn the control knob to adjust microwave power. Press: OK

The maximum time of microwave functions depends on microwave power you set:

MICROWAVE POWER MAXIMUM TIME
100 - 600 W 59:55 minutes
More than 600 W 7 minutes

ELECTROLUX EVM6E46Z - How to set: Microwave heating functions - 1

If you open the door, the microwave function stops. To start it again, close the door. Press OK

6.3 Heating functions

Standard heating functions

Heating function Application
LiquidHeating up drinks and soups, power range: 800 - 1000 W
ReheatHeating up pre-prepared meals and delicate food, power range: 300 - 700 W
DefrostDefrosting meat, fish, cakes, power range: 100 - 200 W
MeltingMelting chocolate and butter, power range: 100 - 400 W
PopcornPreparing popcorn, power range: 700 - 1000 W
Heating function Application
GrillTo grill thin pieces of food and to toast bread.
Grill HighTo cook food in short time and brown it with high grill intensity. Power range: 100 - 500 W.
Grill LowTo cook food in short time and brown it with low grill intensity. For casser- oles such as potato gratin, lasagne. Power range: 100 - 500 W.
MicrowaveHeating up, cooking, power range: 100 - 1000 W
MenuTo enter the Menu: Assisted Cooking, Settings.

6.4 How to set: Assisted Cooking

Every dish in this submenu has a recommended function. You can adjust the time during cooking.

Assisted Cooking - use it to prepare a dish quickly with default settings:
Step 1 Step 2 Step 3 Step 4
=×P1-P12OK
Enter the menu. Select Assisted Cooking. Press OKSelect the dish. Press OK.Insert the dish to the oven. Confirm setting.

6.5 Assisted Cooking

Legend
Function with microwave power. Use microwave safe accessory.
Shelf level.
DishWeight Shelf level/ Accessory Durationtime
Poultry
P1 Whole chick- en1,1 kgow wire rack; ceramic or glass casserole dish Use your favourite spices.35 min
P2 Chicken, two halves0,6 - 0,7 kg per half
Fish
P3 Whole fish 0,6 kgrrtable glass plate; ceramic or glass casserole dish Cover the food with a microwave safe lid with some holes.7 min
P4 Fish fillet 0,5 kg; 150g per filletrrtable glass plate; ceramic or glass casserole dish Cover the food with a microwave safe lid with some holes.4 min
Vegetable / Side dishes
P5 Broccoli 0,5 kgrrtable glass plate; ceramic or glass casserole dish Add 50 ml of water. Cover the food with a microwave safe lid with some holes.8 min
P6 Cauliflower 0,5 kg 8min
P7 Cauliflower, frozen0,5 kg 12 min
P8 Peas, frozen 0,5 kg10 min
P9 Potatoes in their jacket0,5 kg 10 min
DishWeight Shelf level/ Accessory Durationtime
P10 Rice 0,2 kgrrtable glass plate; ceramic or glass casserole dish Add 400 ml of water. Cover the food with a microwave safe lid with some holes.12 min
Gratins
P11 Potato gratin (raw potatoes)1,1 kgow wire rack; ceramic or glass messerole dish37 min
P12 Lasagna with dry noodle plates1 - 1,5 kg 35

7. CLOCK FUNCTIONS

7.1 Clock functions

Clock Function Application
STOPMinute minder. When the timer ends, the signal sounds.
Cooking time. When the timer ends, the signal sounds and the heating function stops.
Time Delay. To postpone the start and / or end of cooking.
1Uptimer. Maximum is 23 h 59 min. This function has no effect on the operation of the oven. To turn on and off the Uptimer select: Menu, Settings.

7.2 How to set: Clock functions

How to set: Time of day
Step 1 Step 2 Step 3
To change the time of day enter the menu and select Settings, Time of day.Set the clock.Press: OK
How to set: Minute minder
Step 1The display shows:0:00Step 2 Step 3
Press:Set the Minute minderPress:OK
① Timer starts counting down immediately.
This function is available only for: Grill, Grill Low, Grill High.
How to set: Cooking time
Step 1 Step 2The display shows:0:00STOPStep 3 Step 4
Choose a heating function and set the temperature.Press repeated-ly:Set the cooking time.Press:OK
① Timer starts counting down immediately.
This function is available only for: Grill, Grill Low, Grill High.
How to set: Time Delay
Step 1 Step 2Step 2The dis-play shows: the time of day STARTStep 3 Step 4The dis-play shows: STOPStep 5 Step 6
Select the heating function.Press repeatedly:Set the start time.Press: OK.Set the end time.Press: OK.
i Timer starts counting down at a set start time.
This function is available only for: Grill.

8. HOW TO USE: ACCESSORIES

8.1 Inserting accessories

Use only suitable cookware and material. Refer to "Hints and tips" chapter, Microwave suitable cookware and materials.

Turntable set: Always cook food on the turntable set. Place the roller guide around the turntable shaft. Place the turntable glass on the roller guide. Use only the turntable set supplied with the oven.
Grill rack set: Place the grill rack with the silicon caps down on the turntable set.

9. ADDITIONAL FUNCTIONS

9.1 Lock

This function prevents an accidental change of the oven function.
Turn it on when the oven works - the set cooking continues, the control panel is locked. Turn it on when the oven is off - the oven cannot be turned on, the control panel is locked.
- press and hold to turn on the function. A signal sounds.- press and hold to turn it off.
3 x 2 flashes when the lock is turned on.

9.2 Automatic switch-off

For safety reasons the oven turns off after some time, if a heating function works and you do not change any settings.

(℃) (h)1
30 - 115 12.5
120 - 195 8.5
200 - 230 5.5

The Automatic switch-off does not work with the functions: Light, Time Delay.

9.3 Cooling fan

When the oven operates, the cooling fan turns on automatically to keep the surfaces of the oven cool. If you turn off the oven, the cooling fan can continue to operate until the oven cools down.

10. HINTS AND TIPS

10.1 Microwave recommendations

Let's cook!

Do not place the food directly on the turntable. Always use the microwave suitable cookware.

Place the cookware in the middle of the turntable.

Make sure that the food and cookware placed on the turntable is at the room temperature.

Contact with too hot or too cold items can break the turntable.

Turn or stir the food halfway through the defrosting and cooking time.

Stir liquid dishes from time to time.

Stir the food before serving.

Cover the food for cooking and reheating.

Put the spoon to the bottle or glass when heating drinks to ensure better heat distribution. Put the food into the oven without packaging. The packaged ready meals can be put into oven only when the packaging is microwave safe (check information on the packaging).

ELECTROLUX EVM6E46Z - Let's cook! - 1

Microwave cooking

Cook food covered. If you want to keep a crust cook food without a cover.

Do not overcook the dishes by setting the power and time too high. The food can dry out, burn or cause fire.

Do not use the oven to cook eggs or snails in their shells, because they can burst. Pierce the yolk of fried egg before reheating it.

Pierce food with skin or peel several times before cooking.

Cut vegetables into similar-sized pieces.

After you turn off the oven, take the food out and let it stand for a few minutes to allow the heat distribute evenly.

ELECTROLUX EVM6E46Z - Microwave cooking - 1

Microwave defrosting

Put the frozen, unwrapped food on a small upturned plate with a container below it, or on a defrosting rack or plastic sieve so that the defrosting liquid can leak out.

Remove defrosted pieces subsequently.

To cook fruit and vegetables without defrosting them first, you can use a higher microwave power.

10.2 Microwave suitable cookware and materials

For the microwave use only suitable cookware and materials. Use below table as a reference. Check the cookware / material specification before use.

Cookware / Material
Ovenproof glass and porcelain with no metal components, e.g. heat-proof glass
Non-ovenproof glass and porcelain without any silver, gold, platinum or other metal decorationsXXXX
Glass and glass ceramic made of ovenproof / frost-proof material
Ceramic and earthenware without any quartz or metal components and glazes which contain metal××
Ceramic, porcelain and earthenware with unglazed bottom or with small holes, e.g. on handlesXXXX
Heat-resistant plastic up to 200 °C××
Cardboard, paper XXX
Microwave clingfilm XXX
Roasting film with microwave safe closure××
Roasting dishes made of metal, e.g. enamel, cast ironXXX
Baking tins, black lacquer or silicon-coatedXXX
Cookware for microwave use, e.g. crisp panXXX
Grill rack set XX

The data in the table is for guidance only.

800 - 1000 W
Searing at the start of the cooking process Heating liquids
500 - 700 W
Cooking vegetablesCooking egg dishesSimmering stewsSimmering riceHeating one-plate mealsDefrosting and heating frozen meals
300 - 400 W
Melting cheese, chocolate, but-terCooking / Heating delicate foodContinuing cooking
100 - 200 W
Heating baby foodDefrosting breadDefrosting fruit and cakesDefrosting cheese, cream, butterDefrosting meat, fish

10.4 Cooking tables for test institutes

Information for test institutes

Tests according to IEC 60705.

MICROWAVE FUNCTIONPOWER (W)(kg)(min)
Sponge cake 600 0.475 Turntableset5-7-
Meatloaf 500 0.9 Tumtableset18 - 20 -
Egg custard 500 1 Tumtableset15 - 17 -
Meat defrosting 2000.5 Tumtableset8 - 9 -
Use the function: Microwave grilling. Use the low grill rack.
MICROWAVE COMBI FUNCTIONPOWER (W) Grill intensity level(min)i
Potato gratin, 1.1 kg 300 lwo30 - 35 -
Chicken, 1.1 kg 300 high 30 - 35 Put the meat inround glass container.

11. CARE AND CLEANING

ELECTROLUX EVM6E46Z - CARE AND CLEANING - 1

WARNING!

Refer to Safety chapters.

11.1 Notes on cleaning

Cleaning AgentsClean the front of the oven with a soft cloth with warm water and a mild detergent.
Use a cleaning solution to clean metal surfaces.
Clean stains with a mild detergent.
Everyday UseClean the cavity after each use. Fat accumulation or other residue may cause fire. Clean the oven ceiling carefully from residue and fat.
Do not store the food in the oven for longer than 20 minutes. Dry the cavity with a soft cloth after each use.
AccessoriesClean all accessories after each use and let them dry. Before cleaning, wait until the turntable is cold. There is a risk that the turntable can break. Use a soft cloth with warm water and a mild detergent. Do not clean the accessories in a dishwasher.
Do not clean the non-stick accessories using abrasive cleaner or sharp-edged objects.

12. TROUBLESHOOTING

ELECTROLUX EVM6E46Z - TROUBLESHOOTING - 1

WARNING!

Refer to Safety chapters.

12.1 What to do if...

In any cases not included in this table please contact with an Authorised Service Centre.

The oven does not turn on or does not heat up
Problem Check if...
You cannot activate or operate the oven. The oven is correctly connected to an electrical supply.
The oven does not heat up. The automatic switch-off is deactivated.
The oven does not heat up. The fuse is not blown.
The oven does not heat up. The Lock is off.
Components
Problem Check if...
The lamp does not work. The lamp is burnt out.Contact an Authorised Service Centre.
The turntable set makes noise. There is food residue below the turntable set.
Error codes
The display shows... Check if...
00:00 There was a power cut. Set the time of day.
If the display shows an error code that is not in this table turn the house fuse off and on to restart the oven. If the error code recurs contact an Authorised Service Centre.

12.2 Service data

If you cannot find a solution to the problem yourself, contact your dealer or an Authorised Service Centre.

The necessary data for the service centre is on the rating plate. The rating plate is on the front frame of the oven cavity. Do not remove the rating plate from the oven cavity.

We recommend that you write the data here:
Model (MOD.)
Product number (PNC)
Serial number (S.N.)

13. ENERGY EFFICIENCY

13.1 Energy saving

Make sure that the oven door is closed when the oven operates. Do not open the oven door too often during cooking. Keep the door gasket clean and make sure it is well fixed in its position. When possible, do not preheat the oven before cooking.

Keep breaks between baking as short as possible when you prepare a few dishes at one time. Cooking with the lamp off

Turn off the lamp during cooking. Turn it on only when you need it.

14. MENU STRUCTURE

14.1 Menu

ELECTROLUX EVM6E46Z - Menu - 1

  • -select to enter the Menu.
Menu structure
Assisted CookingSettings
Step 1 Step 2Step 3 Step 4 Step 5
=OK01 - 09OK
Select the Menu, Settings.Confirm setting.Select the setting.Confirm setting.Adjust the value and press OK
Settings
O1 Time of day Change O2 Display brightness 1 - 5
O3 Key tones 1 - Beep2 - Click3 - Sound offO4 Buzzer volume 1 - 4
O5 Uptimer On / Off O6 Light On / Off
O7 Demo mode Activationcode: 2468O8 Software version Check
O9 Reset all settings Yes / No

15. ENVIRONMENTAL CONCERNS

Recycle materials with the symbol .Put the packaging in relevant containers to recycle it. Help protect the environment and human health by recycling waste of electrical and electronic

appliances. Do not dispose of appliances marked with the symbol with the household waste. Return the product to your local recycling facility or contact your municipal office.

NOUS PENSONS À VOUS

Ensemble Plateau tournant

Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : ELECTROLUX

Model : EVM6E46Z

Category : Electric oven