BARTSCHER WBS1000 I2HR - Warming Cabinet

WBS1000 I2HR - Warming Cabinet BARTSCHER - Free user manual and instructions

Find the device manual for free WBS1000 I2HR BARTSCHER in PDF.

📄 14 pages English EN Download 💬 AI Question 10 questions ⚙️ Specs
Notice BARTSCHER WBS1000 I2HR - page 6
View the manual : Français FR Deutsch DE English EN Italiano IT
Pick your language and provide your email: we'll send you a specifically translated version.
TypeHeated cabinet
BrandBartscher
ModelWBS1000 I2HR
Supply voltage220-240 V
Frequency50-60 Hz
Power consumption400 / 600 / 800 W (depending on model)
Current consumption1.8 / 2.6 / 3.5 A
Power cableH05RN-F 3x1.5 mm²
Max voltage variation+/- 10%
Max frequency variation+/- 1% (continuous), +/- 2% (brief)
UseKeeping food warm
ConnectionGrounded socket required
CleaningHot water and neutral detergent, after disconnecting
SafetyDo not handle without protection, risk of burns
InstallationBy a qualified electrician, mandatory grounding
DisposalIn accordance with applicable standards

Frequently Asked Questions - WBS1000 I2HR BARTSCHER

What is the supply voltage of the Bartscher WBS1000 I2HR heated cabinet?
The supply voltage is 220-240 V, 50-60 Hz. Ensure your installation is compatible.
How to install the heated cabinet?
Installation must be carried out by a qualified electrician. The device must be connected to an effective grounded socket. Check that the voltage and power of the mains correspond to the data on the rating plate.
What is the power of the appliance?
The power consumption is 400 W, 600 W or 800 W depending on the variant. The corresponding current is 1.8 A, 2.6 A or 3.5 A.
How to use the heated cabinet?
Plug in the appliance and set the switch to 'I' to turn on. Place the plates under the heating lamps. To turn off, set the switch to '0' or unplug.
How to clean the heated cabinet?
Unplug the appliance before cleaning. Use hot water and a neutral detergent with a soft brush or sponge. Rinse with a damp cloth.
What to do if the appliance does not heat?
First check that the appliance is plugged in and the switch is set to 'I'. If the problem persists, contact a qualified technician. Do not attempt to repair it yourself.
Can the cabinet be used for anything other than keeping warm?
No, the appliance is designed only for keeping food warm. Any other use is considered improper and may be dangerous.
What are the safety precautions?
Do not handle the heating elements without protection, risk of burns. Unplug before cleaning. The electrical installation must comply with standards. Do not use outdoors.
How to dispose of the appliance at the end of its life?
Dismantling must be carried out in accordance with the applicable standards in your country. Respect the environment by recycling components.
Where is the rating plate located?
The rating plate is located inside the appliance, at the top right of the heating panel. It contains essential technical data.

User questions about WBS1000 I2HR BARTSCHER

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Warming Cabinet in PDF format for free! Find your manual WBS1000 I2HR - BARTSCHER and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. WBS1000 I2HR by BARTSCHER.

USER MANUAL WBS1000 I2HR BARTSCHER

This section shows the symbols and provides information about the model of the appliance, the various responsibilities and the copyright. It concerns heated middle shelf.

For further information refer to paragraph "Technical data" (2).

DATA2PLATE2

BARTSCHER WBS1000 I2HR - DATA2PLATE2 - 1

Power supply frequency 7ax. power input

The data plate shows the identification and technical data of the product.
The data plate is inside the appliance on the right upper part of the heating panel.

BARTSCHER WBS1000 I2HR - DATA2PLATE2 - 2

WARNING!

% not remove, tamper with or erase the “+E” mark of the appliance.
Refer to the data on the ^+ plate of the appliance in all communication with the 7manufacturer (for example: when asking for spare parts, etc.).
The ^+ plate has to be destroyed while scraping the appliance..

The present handbook is intended solely for consultation by the operator. Its content could be modified without notice. The 7anfacturer reserves the right to stop the manufacturing of any model and/or introducing product changes but is not obliged to change products delivered before the modification and declines all responsibilities for any inaccuracy may appear on this handbook related to printing or translation mistakes.

The company cannot assume liability for damage and faulty operation due to:

  • Failure to obey the instructions of this handbook;
    7odification or appliance alteration;
    7maintenance by unspecialized technicians;
    Insufficient maintenance;

  • Improper use of the appliance;
    Exceptional and unforeseeable events;
    Unrespect to domestic legislation on health, hygiene and safety at the workplace;
    The employer is responsible for the periodic training of the operators about the correct use, safety rules and fire prevention.

2. TECHNICAL DATA

RANGE OF HEATED MIDDLE SHELVES

Supply voltageV 220-240 220-240 220-240
FrequencyHz 50-60 50-60 50-60
Max. power inputW 400600800
Max. current requirementA 1,82,63,5
Power cordMmq-H05RN-F3x1,53x1,53x1,5
Max. supply Voltage variation+/- 10%+/- 10%+/- 10%
Max. Frequency variationcontinuous+/-1%+/-1%+/-1%
Max. Frequency variationShort period+/- 2%+/- 2%+/- 2%

BARTSCHER WBS1000 I2HR - TECHNICAL DATA - 1

BARTSCHER WBS1000 I2HR - TECHNICAL DATA - 2

WARNING!

The electric power system and the rooms where the appliance is placed have to respect domestic legislation on safety, accident prevention and fire regulations. On the contrary the Manufacturer won't assume liability for direct and indirect damages to people or things.

3. INSTALLATION AND COMMISSIONING

BARTSCHER WBS1000 I2HR - INSTALLATION AND COMMISSIONING - 1

BARTSCHER WBS1000 I2HR - INSTALLATION AND COMMISSIONING - 2

WARNING!

Intervention on the electric power system must be solely performed by specialized electricians.

Proceed according to the following instruction before connecting the appliance:

Remove the packaging and then the protective film taking care not to scratch the surface;
Make sure the power supply of the appliance shown on the data plate is compatible with the grid voltage;
Check the power supply of the system is set up and able to take the current load, and meets the legal requirements and domestic standards;
The appliance must be earthed;
Plug the appliance. In case of direct connection to the electricity grid (without plug), it's necessary providing for a wall switch, which grants the complete disconnection according to overvoltage III rate and accordingly to installation rules;
Have the system tested by a qualified electrician, if operation of the equipotential earth connection or the safety of the electrical system is in doubt, the symbol below identifies the equipotential connection:

BARTSCHER WBS1000 I2HR - WARNING! - 1

The Manufacturer declines all responsibilities in case of connection made by the user or unspecialized staff

BARTSCHER WBS1000 I2HR - WARNING! - 2

WARNING!

After installation dispose of the packaging according to current regulations.

This appliance is designed and optimized to ensure high performance and efficiency. The sole use of this appliance is keeping food heated.

BARTSCHER WBS1000 I2HR - WARNING! - 1

WARNING!

+contact with hot tableware can cause burns.

Use always suitable safety equipment while handling objectsf

4. MAIN RULES

The Manufacturer does not assume responsibility for faults or damage due to tampering the appliance. This appliance must be used by skilled persons that must be periodically trained for its correct use and according to the safety regulations and prevention of accidents. +contact with hot tableware in the appliance can cause health risks. In order to prevent them use safety equipment and act with suitable caution.

f

BARTSCHER WBS1000 I2HR - MAIN RULES - 1

WARNING!

Intervention on the electric power system must be solely performed by specialized electricians.

5. USE OF THE APPLIANCE

BARTSCHER WBS1000 I2HR - USE OF THE APPLIANCE - 1

Press the main switch on the supply panel that powers the appliance.

Switch on the button "A" to position "I". When the button "A" is switched on, it is lighted up and the appliance is under power and starts operating.

To stop heating turn the switch to "9" position. The heating is so disconnected but the appliance is under power.

Avoid amassing plates and place them under the lights.

Switch off finally the main power supply line ahead of the appliance or plug the appliance off.

9nly when the appliance is disconnected, clean the stainless steel surfaces with warm water and a neutral soap, rinse thoroughly and dry carefully. In case of long period of inactivity, store the appliance in a dry place.

6. DISPOSAL AND RECYCLING

BARTSCHER WBS1000 I2HR - DISPOSAL AND RECYCLING - 1

%ispose of the appliance responsibly and respect the environoment at the end of its useful life. Proced with its disposal in accordance with domestic regulation.

Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : BARTSCHER

Model : WBS1000 I2HR

Category : Warming Cabinet