PIONEER CNSD-250FM - Browser

CNSD-250FM - Browser PIONEER - Free user manual and instructions

Find the device manual for free CNSD-250FM PIONEER in PDF.

📄 40 pages English EN Download 💬 AI Question 10 questions ⚙️ Specs
Notice PIONEER CNSD-250FM - page 1
Pick your language and provide your email: we'll send you a specifically translated version.
Product Type Navigation Software Upgrade SD Card
Model Number CNSD-250FM
Brand Pioneer
Compatible Models AVIC-F500BT, AVIC-X9115BT, AVIC-X910BT, AVIC-F900BT, AVIC-F90BT, AVIC-X7115BT, AVIC-F7010BT, AVIC-X710BT, AVIC-F700BT
Upgrade Content Software program and map database update
Map Database Version Tele Atlas Rel. 09/2009
Upgrade Time Approximately 40 minutes
Number of SD Cards Supplied 2 (Card A and Card B)
Media Number Card Supplied Yes (MEDIANUMBER CARD)
Password Requirement Unique online password from www.pioneernavigationupdate.com (or .ca)
New Navigation Features Signpost and recommended lane, map mode switching, hiding tilt/rotation controls, POI search around address
New MSN Direct Features Traffic flow display, news headlines, local events, stock quotes (AVIC-F500BT/F900BT/F90BT only)
Bluetooth Firmware Update Supported after upgrade
MSN Direct Firmware Update Included for compatible models
Settings Deleted After Upgrade Destination history, favorites, saved POI criteria, NaviSettings, Audio settings, phone data
Language Support Multiple languages (selectable after upgrade)
Safety Precautions Keep SD card away from children, avoid high temperature/shock/liquids
Warranty See included Limited Warranty sheet
Customer Support Pioneer USA: 800-421-1404; Canada: 1-877-283-5901

Frequently Asked Questions - CNSD-250FM PIONEER

What is the Pioneer CNSD-250FM?
The CNSD-250FM is a navigation software upgrade SD card for select Pioneer AVIC models. It updates the software program and map database.
Which Pioneer navigation models are compatible with CNSD-250FM?
Compatible models include: AVIC-F500BT, AVIC-X9115BT, AVIC-X910BT, AVIC-F900BT, AVIC-F90BT, AVIC-X7115BT, AVIC-F7010BT, AVIC-X710BT, and AVIC-F700BT.
How do I perform the upgrade?
1) Check device number, 2) Check current version, 3) Get password from pioneer navigation update website, 4) Insert correct SD card, 5) Enter password, 6) Follow on-screen instructions. The upgrade takes about 40 minutes.
What new features are added after the upgrade?
New features include: signpost and recommended lane display, map mode switching (2D heading up, 2D north up, 3D), hiding tilt/rotation controls, POI search around an address, and for some models: MSN Direct services like traffic flow, news headlines, local events, and stock quotes.
Will my settings and personal data be lost?
Yes, many settings are cleared and reset to default. This includes destination history, favorites, saved POI criteria, navigation settings, audio settings, phone data, and Bluetooth paired phones. Back up important data before upgrading.
What is MSN Direct and how does it work?
MSN Direct is a service that provides real-time traffic, news, events, and stock information via FM radio. After upgrade, compatible models (AVIC-F500BT/F900BT/F90BT) can access these features. A subscription may be required.
How do I get the authentication password?
You need a computer with internet. Go to www.pioneernavigationupdate.com (or .ca for Canada), enter your Media Number and Device Number to generate a unique password. Write it down.
What should I do if the upgrade fails?
If an error occurs, consult your dealer or Pioneer service center. Possible causes: wrong SD card used or card inserted while system was on. Follow the troubleshooting section in the manual.
Can I revert to the previous version after upgrade?
No, the upgrade is permanent. Restore Factory Settings will not revert the software version. It only resets user settings to default.
Where can I find the latest software updates?
Visit Pioneer's website at www.pioneerelectronics.com (or www.pioneerelectronics.ca in Canada) for updates. Register your product to receive notices of future upgrades.

User questions about CNSD-250FM PIONEER

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Browser in PDF format for free! Find your manual CNSD-250FM - PIONEER and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. CNSD-250FM by PIONEER.

USER MANUAL CNSD-250FM PIONEER

UpgradeInstructionsand OperationManualAddendum

2010F-seriesNAVIGATIONUPGRADESD-CARD

CNSD-250FM

2010F/X-seriesNAVIGATIONUPGRADESD-CARD

CNSD-200FM

Thissoftwareupgradewillresultinchangestocertain featuresandavailabilityofinformation.Whilethe changesareintendedtoimprovetheoveralluser experienceformostusers,Pioneeranditslicensors disclaimanywarrantyorliabilityfordamagesin connectionwithsuchchanges.

ThankyouforbuyingthisPioneerproduct.

Pleasereadthroughtheseoperatinginstructionssoyouwillknowhowtooperate yourmodelproperly.

PIONEER CNSD-250FM - ThankyouforbuyingthisPioneerproduct. - 1

Important

  • Thescreensshownintheexamplesmay differfromactualscreens.
  • Actualscreensmaybechangedwithout noticeforperformanceandfunctionimprovements.

PIONEER CNSD-250FM - Important - 1

Precaution

Failuretooperate3

Visitourwebsite4

SDmemorycard4

Manualoverview4

Conventionsusedinthismanual4

Modelstobeupgraded5

-Tocustomerswhohavepurchasedthe CNSD-250FM5

-Tocustomerswhohavepurchasedthe CNSD-200FM5

Renewedpointsthroughthisupgrade5

-Forcustomersupgradingthehardware forthefirsttime5

-Forcustomerswhohavepreviously upgradedthehardware5

Settingitemstobedeletedandinitializedby upgrade7

PIONEER CNSD-250FM - Precaution - 1

Licenseagreement

PIONEERCNSD-250FM,CNSD-200FM-for U.S.A.8

PIONEERCNSD-250FM,CNSD-200FM-for Canada10

TERMSANDCONDITIONSFORTHETELE ATLASDATA12

-EndUserLicensingTerms12

Licenses17

PIONEER CNSD-250FM - Licenseagreement - 1

Aboutthedatabase

Aboutthedataforthemapdatabase22

IconsforXMSatelliteRadio22

PIONEER CNSD-250FM - Aboutthedatabase - 1

Instructionsforupgrading

Thenavigationsystemupgradeprocess23

Preparationforupgrade23

-Checkingthedevicenumber23

-Checkingthecurrentversion23

-Gettingthepasswordfor authentication24

Upgradeprocedures24

-Upgradingthesoftwareprogramand themapdatabase24

-Checkingwhethertheupgradewas doneproperly25

-UpdatingtheBluetoothwireless technologysoftware26

-UpdatingthefirmwareforMSN® Direct service26

PIONEER CNSD-250FM - Instructionsforupgrading - 1

Changesontheupgradedprogram

Navigationfunctions28

–Signpostandrecommendedlane28

-Switchingthemapmode28

- Hidingcontrolsfortiltandrotationangle29

-SearchingforPOIsaroundthe address29

BrowsinginformationonMSNDirect30

-Viewingthetrafficflow30

-Browsingnewsheadlines31

-Browsinglocalevents31

-Browsingstockquotes32

AVfunctions33

-Selectingatrackfromthelist33

SettingsMenu34

-TexturedPolygons34

-POISettings34

-DisplayedInfo34

-ManageTrackLogs34

-Changesofdefaultvalue35

RestoreFactorySettings35

-Settingitemstobedeleted36

PIONEER CNSD-250FM - Changesontheupgradedprogram - 1

Troubleshooting

Problemsintheproceduresforupdating38

Messagesintheproceduresfor updating38

Precaution

  • Readtheentiremanualbeforeupgrading theprogramofyournavigationsystem.
  • Thispackageisunique,andcannotbeinstalledonmorethanoneunit.

Failuretooperate

  • Shouldthenavigationsystemfailtooperateproperly,contactyourdealerornearest authorizedPioneerServiceStation.
  • DonotlosethesuppliedMediaNumber Card(MEDIANUMBERCARD).If the MediaNumberCardislost,reissueofthe MediaNumber(MEDIANUMBER)isnot possible.AlsoyoumustsubmittheMedia NumberCardwhenrepairsareneeded. Thecardisnecessaryasproofofauthenticityifserviceisrequired(includingrecovery).

After-salesserviceforPioneerproducts

Pleasecontactthedealerordistributorfrom whichyoupurchasedtheproductforafter-salesservice(includingwarrantyconditions) oranyotherinformation.Incasethenecessary informationisnotavailable,pleasecontactthe companieslistedbelow. Pleasedonotshipyourproducttothecompaniesattheaddresseslistedbelowforrepair withoutmakingadvancecontact.

•U.S.A

PioneerElectronics(USA)Inc. CUSTOMERSUPPORTDIVISION P.O.Box1760LongBeach,CA90801-1760 800-421-1404

•CANADA

PioneerElectronicsofCanada,Inc. CUSTOMERSATISFACTIONDEPARTMENT 300AllstateParkwayMarkham,Ontario L3R0P2 1-877-283-5901 905-479-4411

Forwarrantyinformation,pleaseesetheLimitedWarrantysheetincludedwithyourproduct.

PIONEER CNSD-250FM - •CANADA - 1

Visitourwebsite

Visitusatthefollowingsite:

http://www.pioneerelectronics.com

InCanada

http://www.pioneerelectronics.ca

1 Registry your product. Wewill keep the details of your purchase on file to help you refer to this information in the event of an insurance claims such as loss or theft.
2Receiveupdatesonthelatestproductsand technologies.
3Downloadowner'smanuals,orderproduct catalogs,researchnewproducts,andmuch more.
4Receivenoticesofsoftwareupgradesand softwareupdates.

SDmemorycard

□KeeptheSDmemorycardoutofthereach ofsmallchildrentopreventthemfromaccidentallyswallowingit.
□DonotstoretheSDmemorycardinhigh temperaturesordirectsunlight.
□DonotsubjecttheSDmemorycardto shockorimpact.
☐DonotallowtheSDmemorycardtocome intocontactwithliquids.Damagetothe SDmemorycardandyourproductscould resultfromcontactwithliquids.
☐Becarefulnottotouchterminalsonthe SDmemorycard.Doingsomaycauseconnectionfailures.Ifanyterminalsaredirty, wipethemwithacleandrycloth.

PIONEER CNSD-250FM - SDmemorycard - 1

SDLogoisattrademarkofSD-3C,LLC.

PIONEER CNSD-250FM - SDmemorycard - 2

Manualoverview

Thismanualdescribeshowtogetthepasswordandactivatetheupgrade.Italsoprovides anoverviewofhowfunctionschangeafterthe upgrade.

Conventionsusedinthis manual

Beforemovingon, take a few minutes to store the following information about the conventions used in this manual. Familiarity with these conventions will help you greatly as you learn how to use your new equipment.

  • ButtonsonyournavigationsystemaredescribedinALLCAPITAL,BOLDlettering: e.g.) Withthemapdisplayed,presstheMENU button.
  • Itemsindifferentmenus, screentitles, and functionalcomponentsaredescribedin boldwithdoublequotationmarks" ": e.g.) Displayingthe"SystemSettings"screen
  • Touchpanelkeysthatareavailableonthe screenaredescribedinboldinbrackets[]: e.g.) Touch[Settings].
  • Extrainformation, alternatives and other notes are presented in the following format: e.g.) □If the homelocation has not been stored yet, set the location first.
  • Referencesareindicatedlikethis: e.g.)
  • Fordetailsoftheoperation,referto Checkingthedevicenumberonpage 23.

Modelstobeupgraded

Tocustomerswhohave purchasedtheCNSD-250FM

Thispackagecanupgradethesoftwareprogramanddatabaseofthefollowingmodels:AVIC-F500BT

ThispackagecomeswithupgradeSDmemory cardsAandB.

ThetypeoftheupgradeSDmemorycardyou needtousedependsonthestateofyournavigationsystem.

Checkthefollowingbeforeusingtheupgrade SDmemorycard.

Customersupgradingthehardwarefor thefirsttime

UsetheupgradeSDmemorycardA.

Customersusethehardwareupgraded byCNSD-150FM

UsetheupgradeSDmemorycardB.

Tocustomerswhohave purchasedtheCNSD-200FM

Thispackagecanupgradethesoftwareprogramanddatabaseofthefollowingmodels:AVIC-X9115BT,AVIC-X910BT,AVIC-F900BT,AVIC-F90BT,AVIC-X7115BT,AVIC-F7010BT,AVIC-X710BT,AVIC-F700BT

ThispackagecomeswithupgradeSDmemory cardsAandB.

ThetypeoftheupgradeSDmemorycardyou needtousedependsonthestateofyournavigationsystem.

Checkthefollowingbeforeusingtheupgrade SDmemorycard.

CustomersusingAVIC-F900BT,AVIC-F90BT,AVIC-F7010BTorAVIC-F700BT, andcustomersupgradingtheir hardwareforthefirsttime

UsetheupgradeSDmemorycardA.

CustomersusingAVIC-F900BT,AVIC-F90BT,AVIC-F7010BTorAVIC-F700BT, andcustomersupgradedthehardware withtheCNSD-100FM

UsetheupgradeSDmemorycardB.

CustomersusingAVIC-X9115BT,AVIC-X910BT,AVIC-X7115BT,AVIC-X710BT

UsetheupgradeSDmemorycardB.

Renewedpointsthrough thisupgrade

Forcustomersupgradingthe hardwareforthefirsttime

ForcustomersusingAVIC-F900BT, AVIC-F90BT,AVIC-F7010BTorAVIC-F700BT

Byupgradingthenavigationsystemwiththis product, thepointsdescribedinthismanual arechanged.

ForcustomersusingAVIC-X9115BT, AVIC-X910BT,AVIC-X7115BTorAVIC-X710BT

Byupgradingthenavigationsystemwiththis product,followingpointsarechanged.

  • Mapdatabase(includingPOI)isrenewed.
  • DeviceNumberisdisplayedonthe"ServiceInformation"screen.
  • TheXMSatelliteRadiointhelineupand iconofthebroadcaststationwillbechan-ged.

Theotheroperationsareessentiallythesame asthoseatthetimeyoupurchasedthehardware. Use theOperationManualincluded in thehardwarepackageasyourprimaryreference.

Forcustomerswhohave previouslyupgradedthehardware

Byupgradingthenavigationsystemwiththis product,followingpointsarechanged.

  • Mapdatabase(includingPOI)isrenewed.
  • DeviceNumberisdisplayedonthe"ServiceInformation"screen.

01

Precaution

• The XMSatelliteRadiointhelineupand iconofthebroadcaststationwillbechanged.

Theotheroperationsareessentiallythesame asthoseatthetimeyoupurchasedthehardware. Use theOperationManualincludedin thehardwarepackageasyourprimaryreference.

Precaution

Settingitemstobedeletedandinitializedbyupgrade

The following data and settings will be cleared and reset to default values. Other items will be retained. However, some items are not listed because the setting can be easily recovered by users, such as the last map scale, the last status of AV operations screen, etc.

Navigationfunctions
DestinationMenuAllsettingson“MSNDirect”
“History”on“Address”
History
Favorites
“SavedCriteria”on“POI”
NaviSettingsAllsettings
SystemSettingsAllsettings
OthersPinicondata
Anti-theftpassword
Audiofunctions
AVSettingsAllsettings
SD,USBAllsettings(*1)
VolumesettingforAVsources,EQsettings(*2)

(*1) All settings including the setting on the "Function" menu are deleted. (*2) These settings are cleared only if you use AVIC-F500BT.

The userdatastored in the internal memory of the unit maybe erased if an unexpected error occurs during software installation. Pioneer is not responsible for any datalossor unavailability of user data.

PIONEER CNSD-250FM - Settingitemstobedeletedandinitializedbyupgrade - 1

PIONEERCNSD-250FM, CNSD-200FM-forU.S.A.

THISISALEGALAGREEMENTBETWEEN YOU, ASTHEENDUSER, ANDPIONEER ELECTRONICS(USA) INC. ("PIONEER"). PLEASEREADTHETERMSANDCONDITIONS OF THIS AGREEMENT CAREFULLY BEFORE USING THESOFTWARE INSTALLED ON THEPIONEER PRODUCTS. BY USING THE SOFTWARE INSTALLED ON THEPIONEER PRODUCTS, YOU AGREETOBEBOUND BY THETERMS OF THIS AGREEMENT. THESOFTWARE INCLUDES ADATABASE LICENSED BY THIRD PARTYSUPPLIER(S) ("SUPPLIERS"), AND YOUR USE OF THE DATABASE ISCOVERED BY THESUPPLIERS' SEPARATE TERMS, WHICH ARE ATTACHED TO THIS AGREEMENT (Refertopage 12). IF Y OUDO NOT AGREE WITH ALLOFTHE SETERMS, PLEASERETURN THEPIONEER PRODUCTS (INCLUDING THESOFTWARE, AND ANY WRITTEN MATERIALS) WITH INFIVE (5) DAYS OF RECEIPT OF THE PRODUCTS, TOTHE AUTHORIZED PIONEER DEALER FROM WHICH Y OUPURCHASED THEM. USE OF THESOFTWARE SHALL BEDEEMED TO BE YOUR CONSENTTOTHELICENSE AGREEMENT.

1GRANTOFLICENSE

Pioneergrantstoyouanon-transferable, non exclusivelicensetousethesoftwareinstalled onthePioneerproducts(the"Software") and therelateddocumentationsolelyforyourown personaluseorforinternalusebyyourbusiness,onlyonsuchPioneerproducts. Youshallnotcopy,reverseengineer,translate, port,modifyormakederivativeworksofthe Software.Youshallnotloan,rent,disclose, publish,sell,assign,lease,sublicense,market orotherwisetransfertheSoftwareoruseitin anymannernotexpresslyauthorizedbythis agreement.Youshallnotderiveorattemptto derivethesourcecodeorstructureofallor anyportionoftheSoftwarebyreverseengineering,disassembly,decompilation,orany

othermeans.YoushallnotusetheSoftwareto operateaservicebureauorforanyotheruse involvingtheprocessingofdataforotherpersonsorentities.

Pioneeranditslicensor(s) shall retain all copyright, trades secret, patent and other proprietary ownership rights in the Software. The Software is copyrighted and may not be copied, even if modified or merged with other products. You shall not alter or remove any copyright notice or proprietary legend contained in or on the Software.

Youmaytransferallofyourlicenserightsin theSoftware,therelateddocumentationanda copyofthisLicenseAgreementtoanother party,providedthatthepartyreadsandagrees toacceptthetermsandconditionsofthisLicenseAgreement.

2DISCLAIMEROFWARRANTY

TheSoftwareandrelateddocumentationare providedtoyou“ASIS”.PIONEERANDITSLICENSOR(S)(forthepurposeofprovisions2 and3,Pioneeranditslicensor(s)shallbecollectivelyreferredtoas“Pioneer”)MAKESAND YOURECEIVENOWARRANTYFORTHESOFTWARE,WHETHEREXPRESSORIMPLIED, ANDALLWARRANTIESOFMERCHANTABILITYANDFITNESSFORANYPARTICULAR PURPOSEFORTHESOFTWAREAREEX-PRESSLYEXCLUDED.SOMESTATESDONOT ALLOWEXCLUSIONOFIMPLIEDWARRANTIES,SOTHEABOVEEXCLUSIONMAYNOT APPLYTOYOU.TheSoftwareiscomplexand maycontainsomenonconformities,defector errors.PioneerdoesnotwarrantthattheSoftwarewillmeetyourneedsorexpectations, thatoperationoftheSoftwarewillbeerrorfree oruninterrupted,orthatallnon-conformities canorwillbecorrected.Furthermore,Pioneer doesnotmakeanyrepresentationsorwarrantiesregardingtheuseorresultsoftheuseof theSoftwareintermsofitsaccuracy,reliability orotherwise.

3LIMITATIONOFLIABILITY

INNOEVENTSHALLPIONEERBELIABLE FORANYDAMAGES,CLAIMORLOSSINCURREDBYYOU(INCLUDING,WITHOUTLIMITATION,COMPENSATORY,INCIDENTAL,INDIRECT,SPECIAL,CONSEQUENTIAL,OREXEMPLARYDAMAGES,LOSTPROFITS,LOSTINCOME,LOSTSALESORBUSINESS,EXPENDITURES,INVESTMENTS,ORCOMMITMENTS INCONNECTIONWITHANYBUSINESS,LOSSOFANYGOODWILL,ORDAMAGES)RESULTINGFROMTHEUSEOFORINABILITYTOUSE THESOFTWARE,EVENIFPIONEERHAS BEENINFORMEDOF,KNEWOF,ORSHOULD HAVEKNOWNOFTHELIKELIHOODOF SUCHDAMAGES.THISLIMITATIONAPPLIES TOANYANDALLCAUSESOFACTIONINDIVIDUALLYORINTHEAGGREGATE,INCLUDING WITHOUTLIMITATIONBREACHOFCONTRACT,BREACHOFWARRANTY,NEGLIGENCE,STRICTLIABILITY, MISREPRESENTATION,ANDOTHERTORTS. IFPIONEER'SWARRANTYDISCLAIMEROR LIMITATIONOFLIABILITYSETFORTHINTHIS AGREEMENTSHALLORFORANYREASON WHATSOEVERBEHELDUNENFORCEABLE ORINAPPLICABLE,YOUAGREETHAT PIONEER'SLIABILITYSHALLNOTEXCEED FIFTYPERCENT(50%)OFTHEPRICEPAIDBY YOUFORTHEENCLOSEDPIONEERPRODUCT.

Somestatesdonotallowtheexclusionorlimitationofincidentalorconsequentialdamages,sotheabovelimitationorexclusion maynotapplytoyou.Thiswarrantydisclaimer andlimitationofliabilityshallnotbeapplicabletotheextentthattheyareprohibited by anyapplicablefederal,stateorlocallawwhich providesthatsuchadisclaimerorlimitation cannotbewaivedorpreempted.

4EXPORTLAWASSURANCES

YouagreeandcertifythatneithertheSoftware noranyothertechnicaldatareceivedfrom Pioneer,northedirectproductthereof,willbe exportedoutsidetheUnitedStatesexceptas authorizedandaspermittedbythelawsand

regulationsoftheUnitedStates.IftheSoftwarehasbeenrightfullyobtainedbyyououtsideoftheUnitedStates,youagreethatyouwillnotre-exporttheSoftwarenoranyothertechnicaldatareceivedfromPioneer,northedirectproductthereof,exceptaspermittedbythelawsandregulationsoftheUnitedStatesandthelawsandregulationsofthejurisdictioninwhichyouobtainedtheSoftware.

5TERMINATION

This Agreement is effective until terminated. You may terminate at any time by destroying the Software. The Agreement also will terminate if you donot comply with any terms or condition so this Agreement. Upon such termination, you agree to destroy the Software.

6U.S.GOVERNMENTENDUSERS

IftheSoftwareisbeingacquiredbyoronbe- halfoftheUnitedStatesgovernmentorany otherentityseekingorapplyingrightssimilar tothosecustomarilyclaimedbytheUnited Statesgovernment,theDataislicensedwith "LimitedRights".UtilizationoftheSoftwareis subjecttotherestrictionsspecifiedinthe "RightsinTechnicalData"clauseatDFARS 252.227-7013,ortheequivalentclausefornon- defenseagencies.PioneerElectronics(USA) Inc.,2265East220thStreet,LongBeach,CA 90810.

7MISCELLANEOUS

ThisistheentireAgreementbetweenPioneer andyouregardingitssubjectmatter.No changeinthisAgreementshallbeeffective unlessagreedtoinwritingbyPioneer.Pioneer retailersdonothavetheauthoritytochange thisAgreement.ThisAgreementshallbegovernedbyandconstruedinaccordancewith theinternallawsoftheStateofCalifornia.If anyprovisionofthisAgreementisdeclaredinvalidorunenforceable,theremainingprovisionsofthisAgreementshallremaininfull forceandeffect.

PIONEERCNSD-250FM, CNSD-200FM-forCanada

THISISALEGALAGREEMENTBETWEEN YOU, ASTHEENDUSER, ANDPIONEER ELECTRONICSOFCANADA, INC. ("PIONEER"). PLEASEREADTHETERMSAND CONDITION SOF THISAGREEMENTCAREFULLYBEFOREUSINGTHESOFTWAREINSTALLEDONTHEPIONEERPRODUCTS. BY USINGTHESOFTWAREINSTALLEDONTHEPIONEERPRODUCTS, YOUAGREETOBE BOUNDBYTHETERMSOFTHISAGREEMENT. THESOFTWAREINCLUDESADATA-BASELICENSEDBYTHIRDPARTYSUPPLIER (S) ("SUPPLIERS"), AND YOUR USE OF THE DATABASE ISCOVERED BY THESUPPLIERS' SEPARATETERMS, WHICH ARE ATTACHED TOTHISAGREEMENT(Refertopage12). IF YOUDONOTAGREEWITHALLOFTHESE TERMS, PLEASERETURNTHEPIONEERPRODUCTS (INCLUDINGTHESOFTWARE, AND ANYWRITTENMATERIALS) WITHINFIVE (5) DAYSOFRECEIPTOFTHEPRODUCTS, TO THEAUTHORIZEDPIONEERDEALERFROM WHICHYOUPURCHASEDTHEM.USEOF THESOFTWARESHALLBEDEEMEDTOBE YOURCONSENTTOTHELICENSEAGREEMENT.

1GRANTOFLICENSE

Pioneergrantstoyouanon-transferable, non exclusivelicensetousethesoftwareinstalled onthePioneerproducts(the"Software") and therelateddocumentationsolelyforyourown personaluseorforinternalusebyyourbusiness,onlyonsuchPioneerproducts. Youshallnotcopy,reverseengineer,translate, port,modifyormakederivativeworksofthe Software.Youshallnotloan,rent,disclose, publish,sell,assign,lease,sublicense,market orotherwisetransfertheSoftwareoruseitin anymannernotexpresslyauthorizedbythis agreement.Youshallnotderive,orattemptto derive,thesourcecodeorstructureofallor anyportionoftheSoftwarebyreverseengineering,disassembly,decompilation,orany

othermeans.YoushallnotusetheSoftwareto operateaservicebureauorforanyotheruse involvingtheprocessingofdataforotherpersonsorentities.

Pioneeranditslicensor(s) shall retain all copyright, trades secret, patent and other proprietary ownership rights in the Software. The Software is copyrighted and may not be copied, even if modified or merged with other products. You shall not alter or remove any copyright notice or proprietary legend contained in or on the Software.

Youmaytransferallofyourlicenserightsin theSoftware,therelateddocumentationanda copyofthisLicenseAgreementtoanother party,providedthatthepartyreadsandagrees toacceptthetermsandconditionsofthisLicenseAgreement.

2DISCLAIMEROFWARRANTY

TheSoftwareandrelateddocumentationare providedtoyou"ASIS".PIONEERANDITSLICENSOR(S)(forthepurposeofprovisions2 and3,Pioneeranditslicensor(s)shallbecollectivelyreferredtoas"Pioneer")MAKESAND YOURECEIVENOWARRANTYFORTHESOFTWARE,WHETHEREXPRESSORIMPLIED, ANDALLWARRANTIESOFMERCHANTABILITYANDFITNESSFORANYPARTICULAR PURPOSEFORTHESOFTWAREAREEX-PRESSLYEXCLUDED.SOMESTATESDONOT ALLOWEXCLUSIONOFIMPLIEDWARRANTIES,SOTHEABOVEEXCLUSIONMAYNOT APPLYTOYOU.TheSoftwareiscomplexand maycontainsomenonconformities,defector errors.PioneerdoesnotwarrantthattheSoftwarewillmeetyourneedsorexpectations, thatoperationoftheSoftwarewillbeerrorfree oruninterrupted,orthatallnon-conformities canorwillbecorrected.Furthermore,Pioneer doesnotmakeanyrepresentationsorwarrantiesregardingtheuseorresultsoftheuseof theSoftwareintermsofitsaccuracy,reliability orotherwise.

3LIMITATIONOFLIABILITY

INNOEVENTSHALLPIONEERBELIABLE FORANYDAMAGES,CLAIMORLOSSINCURREDBYYOU(INCLUDING,WITHOUTLIMITATION,COMPENSATORY,INCIDENTAL,INDIRECT,SPECIAL,CONSEQUENTIAL,OREXEMPLARYDAMAGES,LOSTPROFITS,LOSTSALESORBUSINESS,EXPENDITURES,INVESTMENTS,ORCOMMITMENTSINCONNECTIONWITHANYBUSINESS,LOSSOF ANYGOODWILL,ORDAMAGES)RESULTING FROMTHEUSEOFORINABILITYTOUSE THESOFTWARE,EVENIFPIONEERHAS BEENINFORMEDOF,KNEWOF,ORSHOULD HAVEKNOWNOFTHELIKELIHOODOF SUCHDAMAGES.THISLIMITATIONAPPLIES TOALLCAUSESOFACTIONINTHEAGGREGATE,INCLUDINGWITHOUTLIMITATION BREACHOFCONTRACT,BREACHOFWARRANTY,NEGLIGENCE,STRICTLIABILITY,MIS- REPRESENTATION,ANDOTHERTORTS.IF PIONEER'SWARRANTYDISCLAIMEROR LIMITATIONOFLIABILITYSETFORTHINTHIS AGREEMENTSHALLORFORANYREASON WHATSOEVERBEHELDUNENFORCEABLE ORINAPPLICABLE,YOUAGREETHAT PIONEER'SLIABILITYSHALLNOTEXCEED FIFTYPERCENT(50%)OFTHEPRICEPAIDBY YOUFORTHEENCLOSEDPIONEERPRODUCT.

Somestatesdonotallowtheexclusionorlimitationofincidentalorconsequentialdamages,sotheabovelimitationorexclusion maynotapplytoyou.Thiswarrantydisclaimer andlimitationofliabilityshallnotbeapplicabletotheextentthattheyareprohibited by anyapplicablefederal,stateorlocallawwhich providesthatsuchadisclaimerorlimitation cannotbewaivedorpreempted.

4EXPORTLAWASSURANCES

YouagreeandcertifythatneithertheSoftware noranyothertechnicaldatareceivedfrom Pioneer,northedirectproductthereof,willbe exportedoutsideCanadaexceptasauthorized andaspermittedbythelawsandregulations ofCanada.IftheSoftwarehasbeenrightfully

obtainedbyyououtsideofCanada,youagree thatyouwillnotre-exporttheSoftwareNorany othertechnicaldatareceivedfromPioneer, northedirectproductthereof,exceptaspermittedbythelawsandregulationsofCanada andthelawsandregulationsofthejurisdictioninwhichyouobtainedtheSoftware.

5TERMINATION

This Agreement is effective until terminated. You may terminate at any time by destroying the Software. The Agreement also will terminate if you donot comply with any terms or condition so this Agreement. Upon such termination, you agree to destroy the Software.

6MISCELLANEOUS

ThisistheentireAgreementbetweenPioneer andyouregardingitssubjectmatter.No changeinthisAgreementshallbeeffective unlessagreedtoinwritingbyPioneer.Pioneer retailersdonothavetheauthoritytochange thisAgreement.ThisAgreementshallbegovernedbyandconstruedinaccordancewith theinternallawsoftheProvinceofOntario andthefederallawsofCanadaapplicable therein.IfanyprovisionofthisAgreementis declaredinvalidorunenforceable,theremainingprovisionsofthisAgreementshallremain infullforceandeffect.

TERMSANDCONDITIONS FORTHETELEATLASDATA

EndUserLicensingTerms

THISISALEGALAGREEMENT(THE"AGREEMENT")BETWEENYOU,THEENDUSER,AND PIONEERanditslicensorsofDataproduct (sometimescollectively"Licensors").BY USINGYOURCOPYOFTHELICENSEDDATA, YOUAGREETOTHETERMSANDCONDITIONSOFTHISAGREEMENT.

1GrantofLicense.

Licensorsgrantyouanon-transferable, nonexclusivelicensetousethemapdataandbusinesspointsofinterestinformation(the "POIs"), ownedbyTeleAtlas, (together, the "Data") containedonthesediscs, solely for personal, non-commercial use and not to operate as service bureau or for any other use involving the processing of data of other persons' entities. You may make one (1) copy of the Data for archival or backup purposes only but you may not otherwise copy, reproduce, modify, makes derivativeworks, derive the structure of reverse engine the Data. The Data is restricted for use with the PIONEER Product(s). The Data contains confidential and proprietary information and materials, and may contain trades secrets, so you agree to hold the Data in confidence and trust and not to disclose the Data or any portions in any form, including by renting, leasing, publishing, leasing, sublicensing or transferring the Data to any third party. You are explicitly prohibited from downloading the digital maps and programmes contained in the Data from transferring these to another data carrier or computer. You are prohibited from removing or obscuring any copyright, trademark notice or restricted legend.

2Ownership.

TheDataiscopyrightedbyTeleAtlasanditsLicensorsandtheyretainallownershiprightsin theData.Youagreenottoalter,remove,oblit-

erate,orobscureanycopyrightnoticeorproprietarylegendcontainedinorontheData.

3LimitationofLiability.

NEITHERTELEATLASNORITSSUPPLIERS SHALLBELIABLETOTHEUNDERSIGNED FORANYINCIDENTAL,CONSEQUENTIAL, SPECIAL,INDIRECTOREXEMPLARYDA- MAGESARISINGOUTOFTHISAGREEMENT, INCLUDINGLOSTPROFITSORCOSTSOF COVER,LOSSOFUSEORBUSINESSINTER- RUPTIONORTHELIKE,REGARDLESSOF WHETHERTHEPARTYWASADVISEDOFTHE POSSIBILITYOFSUCHDAMAGES. NOTWITHSTANDINGANYTHINGTOTHECON- TRARYCONTAINEDHEREIN,TELEATLAS SHALLHAVENOMONETARYLIABILITYTO THEUNDERSIGNEDFORANYCAUSE(REG- GARDLESSOFTHEFORMOFACTION) UNDERORRELATINGTOTHISAGREEMENT.

4 Warranty Disclaimer.

THEDATAISPROVIDEDONAN"ASIS"AND "WITHALLFAULTSBASIS"ANDPIONEER, ITSLICENSORS, ANDITSLICENSEDDISTRIBUTORSANDSUPPLIERS (COLLECTIVELY, "SUPPLIERS") EXPRESSLYDISCLAIMALL OTHERWARRANTIES, EXPRESSORIM-PLIED, INCLUDING BUT NOT LIMITED TO, THEIMPLIEDWARRANTIESOFNON-INFRIN-GEMENT, MERCHANTABILITY, EFFECTIVE-NESS, COMPLETENESS, ACCURACY, TITLE AND FITNESS FOR APARTICULAR PURPOSE. PIONEER, ITSLICENSORSANDSUPPLIERS DONOTWARRANTTHATTHEDATAWILL MEETYOURREQUIREMENTSORTHAT THE OPERATION OF THEDATAWILL BEUNINTER-RUPTEDORERRORFREE. NOORALOR WRITTENADVICEGIVEN BYPIONEER, ITSLICENSORS, SUPPLIERSORANY OF THEIRRESPECTIVE EMPLOYEES CREATESA WARRANTY ORIN ANY WAY INCREASES PIONEER', ITSLICENSORSOPPLIERS LIABILITY AND YOU MAY NOT RELYON ANY SUCH INFORMATION OR ADVICE. THIS DIS-CLAIMERIS ANESSENTIAL CONDITION OF THIS AGREEMENT AND YOU ACCEPT THE DATA ON THIS BASIS.

5Termination.

This Agreement will terminate immediately and automatically, without notice, if you breach any term of this Agreement. You agree that in the event to termination of the Agreement, you shall return the Data (including all documentation and all copies) to PIONEER and its suppliers.

6Indemnity.

Youagreetoindemnify,defendandhold PIONEER,itsLicensors,anditssuppliers(includingtheirrespectivelicensors,suppliers, assignees,subsidiaries,affiliatedcompanies, andtherespectiveofficers,directors,employees,shareholders,agentsandrepresentatives) freeandharmlessfromandagainstanyliability,loss,injury(includinginjuriesresultingin death),demand,action,cost,expense,or

claimofanykindorcharacter,includingbut notlimitedtoattorney'sfees,arisingoutofor inconnectionwithanyuseorpossessionby youoftheData.

7US.GOVERNMENTRIGHTS.

IfEndUserisanagency,department,rother entityoftheUnitedStatesGovernment,or fundedinwholeorinpartbytheUnitedStates Government,thenuse,duplication,reproduction,release,modification,disclosureortransferofthiscommercialproduct and accompanyingdocumentation,isrestricted in accordancewiththeLIMITEDorRESTRICTED rightsasdescribedinanyapplicableDFARS orFAR.Incaseofconflictbetweenanyofthe FARand/orDFARSthatmayapplytotheLicensedTeleAtlasProduct,theconstruction thatprovidesgreaterlimitationsontheGov- ernment'srightsshallcontrol.Contractor/ manufacturerisTeleAtlasNorthAmerica, Inc.,11LafayetteStreet,Lebanon,NH03766- 1445.Phone:603.643.0330.TheLicensedTele AtlasProductsare©2006-2009byTeleAtlas. ALLRIGHTSRESERVED.Forpurposeofany publicdisclosureprovisionunderanyfederal, stateorlocallaw,itisagreedthattheLicensed TeleAtlasProductsareatradesecretanda proprietarycommercialproductandnotsub- jecttodisclosure.

8AdditionalprovisionsforTeleAtlas PremiumPointsofInterest(the"POIs"). WithrespecttothePOILicensedTeleAtlas Products:

(The following provisions only referto the products which contain TeleAtlas ^ Premium PointsofInterest.) EndUsers specifically agree that it shall not:

(a)exceptasotherwisespecificallysetforth herein,licenseorotherwiseprovidethePOILicensedTeleAtlasProductstoanythirdparty forthepurposesofresale,sublicensing,redistributionorforthepurposeofcompiling,enhancing,verifying,supplementing,addingto ordeletingfromanymailinglist,geographic ortradedirectories,businessdirectories,classifieddirectories,classifiedadvertisingwhich issold,rented,published,furnishedorinany mannerprovidedtoathirdparty; (b)makethePOILicensedTeleAtlasProducts availableinanon-lineenvironmentunless properlysecuredand/orencryptedtoprevent unauthorizedaccesstothePOILicensedTele AtlasProducts;and (c)usethePOILicensedTeleAtlasProducts, eitherinwholeorinpart,asafactorin(i)establishinganindividual'seligibilityforcredit orinsurance;(ii)connectionwithunderwriting individualinsurance;(iii)evaluatinganindividualforemploymentorpromotions,reassignmentoretentionasanemployee;(iv)in connectionwithadeterminationofanindividual'seligibilityforalicenseorotherbenefit grantedbyagovernmentalauthority;or(v)for solicitingsurvivorsofdeceasedpersons. (d)createmailingortelemarketinglistsunless authorizedinthisAgreement. (e)EndUserwillhousethePOILicensedTele AtlasProductsontheInternetbehindfirewalls andwillimplementasystemofcontrolsthat will(i)protecttheintegrityofthePOILicensed TeleAtlasProducts;(ii)controlaccesstothe POILicensedTeleAtlasProductsand(iii)preventunauthorizedusageorcopyingofthePOI LicensedTeleAtlasProducts. (f)EndUsershalldisplaythePOILicensed TeleAtlasProductcopyrightnoticeatalltimes inconjunctionwiththeTeleAtlascopyright.AsoftheEffectiveDateofthisAgreement,thecopyrightnoticeforthePOILicensedTeleAtlasProducts:

Data by

PIONEER CNSD-250FM - 8AdditionalprovisionsforTeleAtlas PremiumPointsofInterest(the"POIs"). WithrespecttothePOILicensedTeleAtlas Products: - 1

Copyright © 2009

All Rights Reserved

9AdditionalprovisionsforTeleAtlas BrandIconLicensedTeleAtlasProduct(the "BrandIconLicensedTeleAtlasProduct"):

(The following provisions only referto the products which contain TeleAtlas ^® BrandIcon Licensed TeleAtlas Product.)

aEndUser'suseoftheBrandIconLicensed TeleAtlasProductandanyportionthereof, islimitedtousesolelyforthepurposeofenhancingthevalueand/oruseofthespatial vectordatafurnishedormadebyTeleAtlas. Notwithstandinganythingtothecontrary herein,orinanyattachmentorexhibithere- to,innoeventshallEndUserusethe BrandIconLicensedTeleAtlasProduct anyportionthereofinconnectionwithorin conjunctionwithspatialstreetvectordata furnishedormadebyapartyotherthan TeleAtlas.EndUsermayonlyusethe icons,brandnames,logos,trademarksor otherfeatureswithin(andnotseparate from)themapdata.Inaddition,EndUser shallnotmodifyoralterthecolor,shape, size,andorientationoftheBrandIconLic- ensedTeleAtlasProductasprovidedto EndUserwithoutTeleAtlas'spriorwritten approval.

bLicenseeagreesthattheuseofBrandIcon LicensedTeleAtlasProductsubjecttothe termsandconditionssetforthinthisAgree- mentandthattheremaybeadditionalthird partyterms,conditionsandrestrictionsto whichtheuseoftheBrandIconLicensed TeleAtlasProductwillbesubjectprovided totheEndUserfromtimetotimebyLicen- seeinthereleasenotesapplicabletothe ValueAddedProduct.

cShouldEndUserenterintoanycommercial arrangementforadvertising, pay-for-placement, promotionoranysimilarpaidbrand marketingexposurewithanyowners(or theirrepresentatives)ofanyofthebrand iconssuppliedwiththeBrandIconLicensedTeleAtlasProduct, TeleAtlasshall receivenolessthanttwentyfivepercent (25%)ofanyrevenuescollectedinthecontextofanysuchcommercialarrangement, unlessotherwiseagreed-toinadvanceand inwritingbybothparties.

10AdditionalProvisionswithrespectto TeleAtlas® 3DLandmarksLicensedTele AtlasProduct(the"3DLandmarks"):

(The following provisions only referto the products which contain TeleAtlas ^ 3D Landmarks LicensedTeleAtlasProduct.) Licensee agree to include as soon as practically possible, but not later than the first new release of the Value Added Product following Licensee's receipt of any 3D Landmarks, any copyright notices related to the display of such landmarks every Value Added Product and in the "about box" of the Value Added Product. Notwithstanding the aforementioned, TeleAtlashastherighttodecide, at its solediscretion, to remove specific 3D Landmarks in subsequent releases of the Licensed TeleAtlas Products. In such case, Licensee will remove those 3D Landmarks from the Value Added Product as soon as practically possible, but not later than the first new release of the Value Added Product following Licensee's receipt of the Update to the Licensed TeleAtlas Product. TeleAtlasshall not beheld responsible for any possible damages, costsorexpenses incurred by Licensee related to such removal of a 3D Landmark by TeleAtlas from the Licensed TeleAtlas Product failure to remove a 3D Landmark by Licensee from the Value Added Product.

11CopyrightNotices.

Licensee shall conspicuously display each applicable them current copyright notice for the

LicensedTeleAtlasProductsontheinitial splashscreen,inthecode,onthestorage medium,onthepackaging,inthe"Help/About"section,intheoperator'smanual,and inanydisplayedorprintedmapimage,for eachValueAddedProductthatisbasedupon:

1TeleAtlas®MultiNet®NorthAmerica:Asof theEffectiveDate,thecopyrightnoticeis: "©2006-2009TeleAtlas.Allrightsreserved.Thismaterialisproprietaryandthe subjectofcopyrightprotectionandotherintellectualpropertyrightsownedorlicensed toTeleAtlas.TeleAtlasisanauthorizeddistributorofselectedStatisticsCanadacomputerfilesunderAgreementnumber6776. Theproductincludesinformationcopied withpermissionfromCanadianauthorities, including©CanadaPostCorporation,GeoBase®,andDepartmentofNaturalResourcesCanada,Allrightsreserved.The productissourcedinpartfromGeography Division,StatisticsCanada,2008RoadNetworkFile(RNF),92-500-XWE/XWF.TheincorporationofdatasourcesfromStatistics Canadawithinthisproductshallnotbe construedasconstitutinganendorsement byStatisticsCanadaofsuchproduct.The useofthismaterialissubjecttotheterms ofaLicenseAgreement.Youwillbeheldliableforanyunauthorizedcopyingordisclosureofthismaterial."

2TeleAtlas®MultiNet® Mexico:AsoftheEffectiveDate,thecopyrightnoticeis:"© 2006-2009TeleAtlas.Allrightsreserved. Thismaterialisproprietaryandthesubject ofcopyrightprotectionandotherintellectualpropertyrightsownedorlicensedto TeleAtlas.Theuseofthismaterialissubjecttothetermsofalicenseagreement. Youwillbeheldliableforanyunauthorized copyingofdisclosureofthismaterial."

12Miscellaneous.

ThisistheexclusiveandcompleteAgreement betweentheLicensorsandyouregardingits subjectmatter.NothinginthisAgreement shallcreateajointventure,partnershipor principal-agentrelationshipbetweentheLicensorsandyou.Sections2,5and7-11shall survivetheexpirationorterminationofthis Agreement.ThisAgreementmaybeamended, altered,ormodifiedonlybyPIONEER.You maynotassignanypartofthisAgreement withoutPIONEER'priorwittenconsent.You acknowledgeandunderstandthattheData maybesubjecttorestrictionsonexportation andagreetocomplywithanyapplicableexportlaws.Intheeventthatanyprovisionor partofaprovisionofthisAgreementisdeterminedtobeinvalid,illegal,orunenforceable, suchprovisionorpartthereofshallbestricken fromthisAgreementandtheremainderofthis Agreementshallbevalid,legal,andenforceabletothemaximumextentpossible.AnynoticeunderthisAgreementshallbedelivered bycouriertoPIONEER,AttentionLegal Department.

Licenses

7-Zip

License for use and distribution

7-Zip Copyright (C) 1999-2007 Igor Pavlov.

Licenses for files are:

1) 7z.dll: GNU LGPL + unRAR restriction
2) All other files: GNU LGPL

The GNU LGPL + unRAR restriction means that you must follow both GNU LGPL rules and unRAR restriction rules.

Note:

You can use 7-Zip on any computer, including a computer in a commercial organization. You don't need to register or pay for 7-Zip.

GNU LGPL information

This library is free software; you can redistribute it and/or modify it under the terms of the GNU Lesser General Public License as published by the Free Software Foundation; either version 2.1 of the License, or (at your option) any later version.

This library is distributed in the hope that it will be useful, but WITHOUT ANY WARRANTY; without even the implied warranty of MERCHANTABILITY or FITNESS FOR A PARTICULAR PURPOSE. See the GNU Lesser General Public License for more details.

You should have received a copy of the GNU Lesser General Public License along with this library; if not, write to the Free Software Foundation, Inc., 59 Temple Place, Suite 330, Boston, MA 02111-1307 USA

unRAR restriction

The decompression engine for RAR archives was developed using source code of unRAR program. All copyrights to original unRAR code are owned by Alexander Roshal.

The license for original unRAR code has the following restriction:

The unRAR sources cannot be used to re-create the RAR compression algorithm, which is proprietary. Distribution of modified unRAR sources in separate form or as a part of other software is permitted, provided that it is clearly stated in the documentation and source comments that the code may not be used to develop a RAR (WinRAR) compatible archiver.

GNU LESSER GENERAL PUBLIC LICENSE

Version 2.1, February 1999

Copyright (C) 1991, 1999 Free Software Foundation, Inc. 59 Temple Place, Suite 330, Boston, MA 02111-1307 USA Everyone is permitted to copy and distribute verbatim copies of this license document, but changing it is not allowed.

[This is the first released version of the Lesser GPL. It also counts as the successor of the GNU Library Public License, version 2, hence the version number 2.1.]

Preamble

The licenses for most software are designed to take away your freedom to share and change it. By contrast, the GNU General Public Licenses are intended to guarantee your freedom to share and change free software--to make sure the software is free for all its users.

This license, the Lesser General Public License, applies to some specially designated software packages--typically libraries--of the Free Software Foundation and other authors who decide to use it. You can use it too, but we suggest you first think carefully about whether this license or the ordinary General Public License is the better strategy to use in any particular case, based on the explanations below.

When we speak of free software, we are referring to freedom of use, not price. Our General Public Licenses are designed to make sure that you have the freedom to distribute copies of free software (and charge for this service if you wish); that you receive source code or can get it if you want it; that you can change the software and use pieces of it in new free programs; and that you are informed that you can do these things.

To protect your rights, we need to make restrictions that forbid distributors to deny you these rights or to ask you to surrender these rights. These restrictions translate to certain responsibilities for you if you distribute copies of the library or if you modify it.

For example, if you distribute copies of the library, whether gratis or for a fee, you must give the recipients all the rights that we gave you. You must make sure that they, too, receive or can get the source code. If you link other code with the library, you must provide complete object files to the recipients, so that they can relink them with the library after making changes to the library and recompiling it. And you must show them these terms so they know their rights.

We protect your rights with a two-step method: (1) we copyright the library, and (2) we offer you this license, which gives you legal permission to copy, distribute and/or modify the library.

To protect each distributor, we want to make it very clear that there is no warranty for the free library. Also, if the library is modified by someone else and passed on, the recipients should know that what they have is not the original version, so that the original author's reputation will not be affected by problems that might be introduced by others.

Finally, software patents pose a constant threat to the existence of any free program. We wish to make sure that a company cannot effectively restrict the users of a free

program by obtaining a restrictive license from a patent holder. Therefore, we insist that any patent license obtained for a version of the library must be consistent with the full freedom of use specified in this license.

Most GNU software, including some libraries, is covered by the ordinary GNU General Public License. This license, the GNU Lesser General Public License, applies to certain designated libraries, and is quite different from the ordinary General Public License. We use this license for certain libraries in order to permit linking those libraries into non-free programs.

When a program is linked with a library, whether statically or using a shared library, the combination of the two is legally speaking a combined work, a derivative of the original library. The ordinary General Public License therefore permits such linking only if the entire combination fits its criteria of freedom. The Lesser General Public License permits more lax criteria for linking other code with the library.

We call this license the "Lesser" General Public License because it does Less to protect the user's freedom than the ordinary General Public License. It also provides other free software developers Less of an advantage over competing non-free programs. These disadvantages are the reason we use the ordinary General Public License for many libraries. However, the Lesser license provides advantages in certain special circumstances.

For example, on rare occasions, there may be a special need to encourage the widest possible use of a certain library, so that it becomes a de-facto standard. To achieve this, non-free programs must be allowed to use the library. A more frequent case is that a free library does the same job as widely used non-free libraries. In this case, there is little to gain by limiting the free library to free software only, so we use the Lesser General Public License.

In other cases, permission to use a particular library in non-free programs enables a greater number of people to use a large body of free software. For example, permission to use the GNU C Library in non-free programs enables many more people to use the whole GNU operating system, as well as its variant, the GNU/Linux operating system.

Although the Lesser General Public License is Less protective of the users' freedom, it does ensure that the user of a program that is linked with the Library has the freedom and the wherewithal to run that program using a modified version of the Library.

The precise terms and conditions for copying, distribution and modification follow. Pay close attention to the difference between a "work based on the library" and a "work that uses the library". The former contains code derived from the library, whereas the latter must be combined with the library in order to run.

GNU LESSER GENERAL PUBLIC LICENSE

TERMS AND CONDITIONS FOR COPYING, DISTRIBUTION AND MODIFICATION

  1. This License Agreement applies to any software library or other program which contains a notice placed by the copyright holder or other authorized party saying it may be

distributed under the terms of this Lesser General Public License (also called "this License"). Each licensee is addressed as "you".

A "library" means a collection of software functions and/or data prepared so as to be conveniently linked with application programs (which use some of those functions and data) to form executables.

The "Library", below, refers to any such software library or work which has been distributed under these terms. A "work based on the Library" means either the Library or any derivative work under copyright law: that is to say, a work containing the Library or a portion of it, either verbatim or with modifications and/or translated straightforwardly into another language. (Hereinafter, translation is included without limitation in the term "modification".)

"Source code" for a work means the preferred form of the work for making modifications to it. For a library, complete source code means all the source code for all modules it contains, plus any associated interface definition files, plus the scripts used to control compilation and installation of the library.

Activities other than copying, distribution and modification are not covered by this License; they are outside its scope. The act of running a program using the Library is not restricted, and output from such a program is covered only if its contents constitute a work based on the Library (independent of the use of the Library in a tool for writing it). Whether that is true depends on what the Library does and what the program that uses the Library does.

  1. You may copy and distribute verbatim copies of the Library's complete source code as you receive it, in any medium, provided that you conspicuously and appropriately publish on each copy an appropriate copyright notice and disclaimer of warranty; keep intact all the notices that refer to this License and to the absence of any warranty; and distribute a copy of this License along with the Library.

You may charge a fee for the physical act of transferring a copy, and you may at your option offer warranty protection in exchange for a fee.

  1. You may modify your copy or copies of the Library or any portion of it, thus forming a work based on the Library, and copy and distribute such modifications or work under the terms of Section 1 above, provided that you also meet all of these conditions:

a) The modified work must itself be a software library.
b) You must cause the files modified to carry prominent notices stating that you changed the files and the date of any change.
c) You must cause the whole of the work to be licensed at no charge to all third parties under the terms of this License.
d) If a facility in the modified Library refers to a function or a table of data to be supplied by an application program that uses the facility, other than as an argument passed when the facility is invoked, then you must make a good faith effort to ensure that, in the event an application does not supply such function or table, the facility still operates, and performs whatever part of its purpose remains meaningful.

(For example, a function in a library to compute square roots has a purpose that is entirely well-defined independent of the application. Therefore, Subsection 2d requires that any application-supplied function or table used by this function must be optional: if the application does not supply it, the square root function must still compute square roots.)

These requirements apply to the modified work as a whole. If identifiable sections of that work are not derived from the Library, and can be reasonably considered independent and separate works in themselves, then this License, and its terms, do not apply to those sections when you distribute them as separate works. But when you distribute the same sections as part of a whole which is a work based on the Library, the distribution of the whole must be on the terms of this License, whose permissions for other licensees extend to the entire whole, and thus to each and every part regardless of who wrote it.

Thus, it is not the intent of this section to claim rights or contest your rights to work written entirely by you; rather, the intent is to exercise the right to control the distribution of derivative or collective works based on the Library.

In addition, mere aggregation of another work not based on the Library with the Library (or with a work based on the Library) on a volume of a storage or distribution medium does not bring the other work under the scope of this License.

  1. You may opt to apply the terms of the ordinary GNU General Public License instead of this License to a given copy of the Library. To do this, you must alter all the notices that refer to this License, so that they refer to the ordinary GNU General Public License, version 2, instead of to this License. (If a newer version than version 2 of the ordinary GNU General Public License has appeared, then you can specify that version instead if you wish.) Do not make any other change in these notices.

Once this change is made in a given copy, it is irreversible for that copy, so the ordinary GNU General Public License applies to all subsequent copies and derivative works made from that copy.

This option is useful when you wish to copy part of the code of the Library into a program that is not a library.

  1. You may copy and distribute the Library (or a portion or derivative of it, under Section 2) in object code or executable form under the terms of Sections 1 and 2 above provided that you accompany it with the complete corresponding machine-readable source code, which must be distributed under the terms of Sections 1 and 2 above on a medium customarily used for software interchange.

If distribution of object code is made by offering access to copy from a designated place, then offering equivalent access to copy the source code from the same place satisfies the requirement to distribute the source code, even though third parties are not compelled to copy the source along with the object code.

  1. A program that contains no derivative of any portion of the Library, but is designed to work with the Library by being compiled or linked with it, is called a "work that uses the Library". Such a work, in isolation, is not a derivative

work of the Library, and therefore falls outside the scope of this License.

However, linking a "work that uses the Library" with the Library creates an executable that is a derivative of the Library (because it contains portions of the Library), rather than a "work that uses the library". The executable is therefore covered by this License.

Section 6 states terms for distribution of such executables.

When a "work that uses the Library" uses material from a header file that is part of the Library, the object code for the work may be a derivative work of the Library even though the source code is not.

Whether this is true is especially significant if the work can be linked without the Library, or if the work is itself a library. The threshold for this to be true is not precisely defined by law.

If such an object file uses only numerical parameters, data structure layouts and accessors, and small macros and small inline functions (ten lines or less in length), then the use of the object file is unrestricted, regardless of whether it is legally a derivative work. (Executables containing this object code plus portions of the Library will still fall under Section 6.)

Otherwise, if the work is a derivative of the Library, you may distribute the object code for the work under the terms of Section 6.

Any executables containing that work also fall under Section 6, whether or not they are linked directly with the Library itself.

  1. As an exception to the Sections above, you may also combine or link a "work that uses the Library" with the Library to produce a work containing portions of the Library, and distribute that work under terms of your choice, provided that the terms permit modification of the work for the customer's own use and reverse engineering for debugging such modifications.

You must give prominent notice with each copy of the work that the Library is used in it and that the Library and its use are covered by this License. You must supply a copy of this License. If the work during execution displays copyright notices, you must include the copyright notice for the Library among them, as well as a reference directing the user to the copy of this License. Also, you must do one of these things:

a) Accompany the work with the complete corresponding machine-readable source code for the Library including whatever changes were used in the work (which must be distributed under Sections 1 and 2 above); and, if the work is an executable linked with the Library, with the complete machine-readable "work that uses the Library", as object code and/or source code, so that the user can modify the Library and then relink to produce a modified executable containing the modified Library. (It is understood that the user who changes the contents of definitions files in the Library will not necessarily be able to recompile the application to use the modified definitions.)

b) Use a suitable shared library mechanism for linking with the Library. A suitable mechanism is one that (1) uses at run time a copy of the library already present on the user's computer system, rather than copying library functions into the executable, and (2) will oper-

ate properly with a modified version of the library, if the user installs one, as long as the modified version is interface-compatible with the version that the work was made with.

c) Accompany the work with a written offer, valid for at least three years, to give the same user the materials specified in Subsection 6a, above, for a charge no more than the cost of performing this distribution.
d) If distribution of the work is made by offering access to copy from a designated place, offer equivalent access to copy the above specified materials from the same place.
e) Verify that the user has already received a copy of these materials or that you have already sent this user a copy.

For an executable, the required form of the "work that uses the Library" must include any data and utility programs needed for reproducing the executable from it. However, as a special exception, the materials to be distributed need not include anything that is normally distributed (in either source or binary form) with the major components (compiler, kernel, and so on) of the operating system on which the executable runs, unless that component itself accompanies the executable.

It may happen that this requirement contradicts the license restrictions of other proprietary libraries that do not normally accompany the operating system. Such a contradiction means you cannot use both them and the Library together in an executable that you distribute.

  1. You may place library facilities that are a work based on the Library side-by-side in a single library together with other library facilities not covered by this License, and distribute such a combined library, provided that the separate distribution of the work based on the Library and of the other library facilities is otherwise permitted, and provided that you do these two things:

a) Accompany the combined library with a copy of the same work based on the Library, uncombined with any other library facilities. This must be distributed under the terms of the Sections above.
b) Give prominent notice with the combined library of the fact that part of it is a work based on the Library, and explaining where to find the accompanying uncombined form of the same work.

  1. You may not copy, modify, sublicense, link with, or distribute the Library except as expressly provided under this License. Any attempt otherwise to copy, modify, sublicense, link with, or distribute the Library is void, and will automatically terminate your rights under this License. However, parties who have received copies, or rights, from you under this License will not have their licenses terminated so long as such parties remain in full compliance.
  2. You are not required to accept this License, since you have not signed it. However, nothing else grants you permission to modify or distribute the Library or its derivative works. These actions are prohibited by law if you do not accept this License. Therefore, by modifying or distributing the Library (or any work based on the Library), you indicate your acceptance of this License to do so, and all its terms

and conditions for copying, distributing or modifying the Library or works based on it.

  1. Each time you redistribute the Library (or any work based on the Library), the recipient automatically receives a license from the original licensor to copy, distribute, link with or modify the Library subject to these terms and conditions. You may not impose any further restrictions on the recipients' exercise of the rights granted herein. You are not responsible for enforcing compliance by third parties with this License.
  2. If, as a consequence of a court judgment or allegation of patent infringement or for any other reason (not limited to patent issues), conditions are imposed on you (whether by court order, agreement or otherwise) that contradict the conditions of this License, they do not excuse you from the conditions of this License. If you cannot distribute so as to satisfy simultaneously your obligations under this License and any other pertinent obligations, then as a consequence you may not distribute the Library at all. For example, if a patent license would not permit royalty-free redistribution of the Library by all those who receive copies directly or indirectly through you, then the only way you could satisfy both it and this License would be to refrain entirely from distribution of the Library.

If any portion of this section is held invalid or unenforceable under any particular circumstance, the balance of the section is intended to apply, and the section as a whole is intended to apply in other circumstances.

It is not the purpose of this section to induce you to infringe any patents or other property right claims or to contest validity of any such claims; this section has the sole purpose of protecting the integrity of the free software distribution system which is implemented by public license practices. Many people have made generous contributions to the wide range of software distributed through that system in reliance on consistent application of that system; it is up to the author/donor to decide if he or she is willing to distribute software through any other system and a licensee cannot impose that choice.

This section is intended to make thoroughly clear what is believed to be a consequence of the rest of this License.

  1. If the distribution and/or use of the Library is restricted in certain countries either by patents or by copyrighted interfaces, the original copyright holder who places the Library under this License may add an explicit geographical distribution limitation excluding those countries, so that distribution is permitted only in or among countries not thus excluded. In such case, this License incorporates the limitation as if written in the body of this License.
  2. The Free Software Foundation may publish revised and/or new versions of the Lesser General Public License from time to time. Such new versions will be similar in spirit to the present version, but may differ in detail to address new problems or concerns.

Each version is given a distinguishing version number. If the Library specifies a version number of this License which applies to it and "any later version", you have the option of following the terms and conditions either of that version or of any later version published by the Free Software Foundation. If the Library does not specify a license version number, you may choose any version ever published by the Free

Licenseagreement

Software Foundation.

  1. If you wish to incorporate parts of the Library into other free programs whose distribution conditions are incompatible with these, write to the author to ask for permission. For software which is copyrighted by the Free Software Foundation, write to the Free Software Foundation; we sometimes make exceptions for this. Our decision will be guided by the two goals of preserving the free status of all derivatives of our free software and of promoting the sharing and reuse of software generally.

NO WARRANTY

  1. BECAUSE THE LIBRARY IS LICENSED FREE OF CHARGE, THERE IS NO WARRANTY FOR THE LIBRARY, TO THE EXTENT PERMITTED BY APPLICABLE LAW. EXCEPT WHEN OTHERWISE STATED IN WRITING THE COPYRIGHT HOLDERS AND/OR OTHER PARTIES PROVIDE THE LIBRARY "AS IS" WITHOUT WARRANTY OF ANY KIND, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. THE ENTIRE RISK AS TO THE QUALITY AND PERFORMANCE OF THE LIBRARY IS WITH YOU. SHOULD THE LIBRARY PROVE DEFECTIVE, YOU ASSUME THE COST OF ALL NECESSARY SERVICING, REPAIR OR CORRECTION.

  2. IN NO EVENT UNLESS REQUIRED BY APPLICABLE LAW OR AGREED TO IN WRITING WILL ANY COPYRIGHT HOLDER, OR ANY OTHER PARTY WHO MAY MODIFY AND/OR REDISTRIBUTE THE LIBRARY AS PERMITTED ABOVE, BE LIABLE TO YOU FOR DAMAGES, INCLUDING ANY GENERAL, SPECIAL, INCIDENTAL OR CONSEQUENTIAL DAMAGES ARISING OUT OF THE USE OR INABILITY TO USE THE LIBRARY (INCLUDING BUT NOT LIMITED TO LOSS OF DATA OR DATA BEING RENDERED INACCURATE OR LOSSES SUSTAINED BY YOU OR THIRD PARTIES OR A FAILURE OF THE LIBRARY TO OPERATE WITH ANY OTHER SOFTWARE), EVEN IF SUCH HOLDER OR OTHER PARTY HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES.

END OF TERMS AND CONDITIONS

How to Apply These Terms to Your New Libraries

If you develop a new library, and you want it to be of the greatest possible use to the public, we recommend making it free software that everyone can redistribute and change. You can do so by permitting redistribution under these terms (or, alternatively, under the terms of the ordinary General Public License).

To apply these terms, attach the following notices to the library. It is safest to attach them to the start of each source file to most effectively convey the exclusion of warranty; and each file should have at least the "copyright" line and a pointer to where the full notice is found.

Copyright (C)

This library is free software; you can redistribute it and/or modify it under the terms of the GNU Lesser General Public License as published by the Free Software Foundation; either version 2.1 of the License, or (at your option) any

later version.

This library is distributed in the hope that it will be useful, but WITHOUT ANY WARRANTY; without even the implied warranty of MERCHANTABILITY or FITNESS FOR A PARTICULAR PURPOSE. See the GNU Lesser General Public License for more details.

You should have received a copy of the GNU Lesser General Public License along with this library; if not, write to the Free Software Foundation, Inc., 59 Temple Place, Suite 330, Boston, MA 02111-1307 USA

Also add information on how to contact you by electronic and paper mail.

You should also get your employer (if you work as a programmer) or your school, if any, to sign a "copyright disclaimer" for the library, if necessary. Here is a sample; alter the names:

Yoyodyne, Inc., hereby disclaims all copyright interest in the library 'Frob' (a library for tweaking knobs) written by James Random Hacker.

, 1 April 1990 Ty Coon, President of Vice

That's all there is to it!

7-Zip Source Notice

The software program used in this product contains 7-Zip library. 7-Zip contains the software granted permission for the usage under the terms of the GNU Lesser General Public License. A copy of appropriate source code is available at customer necessary expense for the distribution.

Please contact our Customer Support Center to obtain a copy. For more information on the GNU Lesser General Public License, visit the GNU's website at http://www.gnu.org.

PIONEER CNSD-250FM - 7-Zip Source Notice - 1

Aboutthedataforthemap database

  • Modificationsrelatedtoroads,streets/highways,terrain,constructionandotherthings before/duringthedevelopmentperiodmay notbereflectedinthisdatabase.Inevitably, thosemodificationsafterthatperiodare notreflectedinthisdatabase.
  • Regardlessofexistingandnewly-built things,thedatamaybedifferentfromthe actualcondition.
  • Fordetailsaboutthemapcoverageofthis navigationsystem,refertotheinformation onourwebsite.
  • Itisstrictlyprohibitedtoreproduceanduse anypartorthewholeofthismapinany formwithoutpermissionfromthecopyright owner.
  • If the local traffic regulations or conditions deviate from this data, follow the local traffic regulations (such as signs, indications, etc.) and conditions (such as construction, weather, etc.).
  • Thetrafficregulationdatausedinthemap databaseappliesonlytostandardsized passengervehicles. Notethatregulations forlargervehicles,motorbikes,andother non-standardvehiclesarenotincluded in thedatabase.
    • MapVersion, TeleAtlas. Rel. 09/2009.
  • PoweredbyNNG

IconsforXMSatelliteRadio

Theiconofeachbroadcaststationiscontainedintheharddiskdrivebasedonthedata providedbyXMSatelliteRadioasofSeptember2009.

AnychangesmadebyXMSatelliteRadioin thelineuporiconofthebroadcaststation in thefuturemaynotbesupportedbythenavigationsystem,andmaycausetheunittodisplay incorrecticons.

Thenavigationsystem upgradeprocess

1 Checkthedevicenumberofyournavigation system.

Fordetails, referto Checking the device number on this page.

PIONEER CNSD-250FM - Thenavigationsystem upgradeprocess - 1

2 Checktheversioninformation.

→Fordetails, referto Checking the current version on this page.

PIONEER CNSD-250FM - Thenavigationsystem upgradeprocess - 2

3 Getthepasswordforauthentication.

→Fordetails,refertoGettingthepassword forauthenticationonthenextpage.

PIONEER CNSD-250FM - Thenavigationsystem upgradeprocess - 3

4 Upgradethesoftwareprogramofyournavigationsystem.

Fordetails, refertoUpgradingthesoftwareprogramandthemapdatabaseonthenextpage.

PIONEER CNSD-250FM - Thenavigationsystem upgradeprocess - 4

5 Checkwhethertheupgradewasdoneproperly.

PIONEER CNSD-250FM - Thenavigationsystem upgradeprocess - 5

6 UpdatetheBluetoothfirmware.

Fordetails, refertoUpdatingtheBluetoothwirelesstechnologysoftwareonpage26.

PIONEER CNSD-250FM - Thenavigationsystem upgradeprocess - 6

⑦UpdatethefirmwareforMSNDirectservice.

Fordetails, referto Updating the firm-wareforMSN ^® Directservice on page 26.

PIONEER CNSD-250FM - Thenavigationsystem upgradeprocess - 7

Preparationforupgrade Checkingthedevicenumber

First, check your device number (DEVICENUMBER, displayed such as DeviceNumber or Device#) of your navigation system for later procedures. Todisplay the device number, do the following.

1 Park your vehicle in as a safe place and apply the parking brake.

2InserttheupgradeSDmemorycard intotheSDcardslot.

3TurntheignitionswitchOFFandback ONtorebootthenavigationsystem.

Afterashortpause, the device number will appear.

4Writedownyourdevicenumber (Device#)ontothesuppliedMediaNumber Card(MEDIANUMBERCARD)toavoidmis-takes.

5Touch[Cancel].

Thenavigationsystemrestarts.

6Turnoffthevehicleenginetoterminatethesystem.

Thenavigationsystemisalsoturnedoff.

7EjecttheupgradeSDmemorycard.

Checking the current version

Youmayneedtheversioninformationtoconfirmcompletionofupgrade.Checktheversioninformationusingthefollowingprocedure.

1PresstheMENUbuttontodisplaythe "TopMenu", andthentouch[Settings].

2Touch[SystemSettings].

The "SystemSettings" menuappears.

3Touch[ServiceInformation]onthe "SystemSettings"menu.

4 Writedowntheversiondisplayed in "Map Version" and "Version".

Getting the password for authentication

Web-connectedcomputerisrequiredforonlineissuanceofpassword.

Forupgrade, an unique password issued on-line is necessary. Access the website with your PC and get your password.

The following information is required.

• MediaNumber(MEDIANUMBER)printed on supplied MediaNumberCard (MEDIANUMBERCARD)

- DeviceNumber(DEVICENUMBER) of your navigation system

1Accessonthefollowingwebsiteto issueyourpassword.

http://www.pioneernavigationupdate.com

InCanada:

http://www.pioneernavigationupdate.ca

Forissuingthepassword, followtheinstructiononthewebsite.

2Recordthepasswordthatyoureceived.

Youneedtoinputthispasswordaccurately. Writedownyourpasswordtoavoidmis-takes.

Upgradeprocedures

Upgradingthesoftware programandthemapdatabase

Thissectiondescribestheupgradeproceduresforyournavigationsystem.

☐Theupgradetakesapproximately40minutesintotal.
□IfyouuseAVIC-F500BT,besuretofollow theinstructionsgivenbelow.

- Attachthenavigationunittothecradle beforeupgradinganddon'tdetachthe navigationunitduringupgrading.

- Turnthenavigationunit'spowercompletelyoffbypassingandholdingthe Powerbutton.

- Neverstartupgradingwhenthenavigationunitrunswiththebattery.Otherwise,theupgradecannotcomplete becausethebatteryrunsout.

1 Park your vehicle in as a safe place and apply the parking brake.

2InserttheupgradeSDmemorycard intotheSDcardslot.

3TurntheignitionswitchOFFandback ONtorebootthenavigationsystem.

Afterashortpause, the device number will appear.

4Touch[OK].
Password needed to proceed with upgrade. See manual for details. Device#: 8C476065063A10104 If you already have the Password, press "OK" to start upgrade. OK Cancel

Afterashortpause,thekeyboardforentering thepasswordwillappear.

☐Tocanceltheupgrade,touch[Cancel].

5Enterthepasswordforauthentication thatyouobtained, thentouch[Done].
Enter password 1 2 3 4 5 6 7 8 9 0 Q W E R T Y U I O P A S D F G H J K L Z X C V B N M Space Cancel Done

Afteryoutouch[Done], thesystemstartsthe authentication. Whentheauthenticationisfinishedproperly, amessageforconfirmation willappear.

6Touch[Yes]tostarttheupgrade.

Start upgrade? Press "YES" to begin upgrade after reboot. All functions are disabled until upgrade is complete.

Thenavigationsystemrestartsandthentheinstallationbegins.

☐Tocanceltheupgrade,touch[No]. Whentheprogramupgradeiscomplete,a confirmationmessageappears.

7Touch[OK].

Upgrade complete. New data and all functionality will be available after reboot. OK

Themessageconfirmingwhetheryouwantto keepthecurrentsplashscreenappears.

8Touchthekeythatyouwanttoselect.

Thenavigationsystemrestartsandthentheinstallationbegins.

9Waituntiltheupgradeprocessiscomplete.

CAUTION While this screen is visible, NEVER switch the ignition key position or turn off the power of navigation system. Update APL: ---- => 4.000100 CADA: ---- => 3.000000 MAP: ---- => 03.000000 CEMAGE: 6.1.7.0 => 6.2.2.8 Updating APL----Used Time: 00:00:18 Copying: [Storage Card][PUERTOR][API]2dModel.LAY 21%

Aftertheinstallationiscomplete,thenavigationsystemrestarts.

10Touchthelanguagethatyouwantto useonthescreen.

11Touchthelanguagethatyouwantto useforthevoiceguidance.

The "Top Menu" screen appears.

12EjecttheupgradeSDmemorycard.

Checkingwhethertheupgrade wasdoneproperly

Display"ServiceInformation"screentocomparethecurrentversionnumberwiththepreviousone.

→Fordetails, referto Checking the current version on page 23.

UpdatingtheBluetooth wirelesstechnologysoftware

AccessthePioneerwebsitetocheckyour phone'scompatibility.Ifyourphoneisonthe listandyouwishtoupdate,manuallyupdate theBluetoothfirmwareaftertheautomaticupgradeisfinished.

http://www.pioneerelectronics.com

InCanada

http://www.pioneerelectronics.ca

☐Registeredphonesthatarelistedonthe "Connection" screenareclearedbythe softwareupdate.

1 Park your vehicle in as a safe place and apply the parking brake.

2InserttheupgradeSDmemorycard intotheSDcardslot.

3PresstheMENUbuttontodisplaythe "TopMenu".

4Touch[Phone].

The "PhoneMenu" screenappears.

5Touch[PhoneSettings].

The "PhoneSettings" screenappears.

6Touch[BluetoothSoftwareUpdate].

The current version is displayed.

Bluetooth Software Update Version: HW100-SW330 RC3 Software Update

7Touch[SoftwareUpdate].

Updatestarts.

8Waituntiltheupdateprocessiscomplete.

Amessagewillappearaftertheupdateis complete.

9Touch[OK].

10EjecttheupgradeSDmemorycard.

Updateiscompleted.

Updating the firmware for MSN® Directservice

ThispackageupdatesthefirmwareforMSN Directservice.Theupdateprogressesinthe background.Checkthestatusoconfirmthe completionofupdate.

Thisupdateisforcustomersusingthe AVIC-F500BT,AVIC-F900BTorAVIC-F90BT andforcustomerswhohaveneverupdated thefirmwareforMSNDirectservicebefore.

☐Theupdatewilltakesapproximately8minutes.

□Donotuseotherfunctionsuntiltheupdate iscompleted.

1 Park your vehicle in as a safe place and apply the parking brake.

2InserttheupgradeSDmemorycard intotheSDcardslot.

3TurntheignitionswitchOFFandback ONtorebootthenavigationsystem.

4Waituntilthesystemstartsupanddisplays"TopMenu".

5Touch[Destination]onthe"TopMenu", andthentouch[MSNDirect].

6Touch[Status].

Themessage"ConnectingtoMSNDirect" appearsonthescreen.

7Waituntiltheupdatestarts.

Whentheupdatestarts, aprogressscreenappears.

Instructionsforupgrading

8Waituntilthecurrentstatusisdis- played.

If the update finishes, the "MSNDirect:Status" will appear.

MSN Direct: Status Subscription Status: Active To activate/renew the MSN Direct receiver, go to http://www.msndirect.com/pioneer or Call 1-866-658-7032 You will need the product key below: XXXXX-XXXXX-XXXXX-XXXXX

9Touchtoreturntotheprevious screen.

The "MSNDirect" screenappears.

10Touchthefollowingareasinorder.

MSN Direct Gas Prices Movie Times Weather Traffic News Headlines Local Events Stock Quotes Notice about MSN Direct Status

The "MSNDirectStatusInfo" screenappears.

11Check"builtversion".

"2.60.1001" is displayed if the update finished properly.

12EjecttheupgradeSDmemorycard.

TurntheignitionswitchOFFandbackONto rebootthenavigationsystem.

☐ If "built version" is not "2.60.1001", re-inserttheupgradeSDmemorycardandre-bootsthenavigationsystemtorepeatthe stepsabove.

"SubscriptionStatus" for MSNDirect service

  • Inactive mean that MSNDirectservice is not activated yet.
  • ActivemeansthatMSNDirectserviceis activated.
  • Expiredmeansthatyoursubscriptionis outofdate.

Changesontheupgradedprogram

If you upgrade your navigations system using this SD memory card, the system will have the following changes.

Signpostandrecommendedlane

Signpostswillappeartogetherwiththerecommendedlanewheremulti-laneroadsexist whenyouaredrivingonyourroute.Thehigh-lightedlaneindicatestherecommendedlane.

6.7 mi 101 2 Hollywood Fwy EXIT GB Normandle Ave Melrose Ave 12.3 mi N Heliotrope Dr Oxford St Marathon St N Vermont Ave 1000 ft Oakwood Ave Riverside Ave 13.5 mi 18:28 Hollywood Fwy (US 101/NB/HWY 2/WB) iPod

Thisinformationisbasedonthemapdatabase. Thus, theinformationmaydifferfrom actualconditions. Useitasjustadirectionalreferenceforyourdriving.

Switchingthemapmode

Thereareanumberofmapdisplays. Touchingthemapmodeselectorallowsyouto changethemapdisplay.

1.4 mi » Forest Lawn Drive 134 Burbank N California St. N Luna St. N Avon St. S Avon St. S Cordova St. W Riverwalk W Olive Ave. Hollywood War 30 mi 5:02 Burbank (Los Angeles), Ventura Fwy (HWY 134/WB) iPa

Mapmodeselector

2Dmapscreen(Headingupmode)
2.7 mi » Forest Lawn Drive 10:21 3.5 mi 134 Cahuenga Blvd Unnamed road 4.3 mi 6:42 Denny Ave Sausage St Noorgark Way Strahm Ave Pang Altrest Ave Denny Ave Denny Ave Pang Altrest Ave Denny Ave Denny Ave Denny Ave Denny Ave Denny Ave Denny Ave Denny Ave Denny Ave Denny Ave Denny Ave Denny Ave Denny Ave Denny Ave Denny Ave Denny Ave Denny Ave Denny Ave Denny Ave Denny Ave Denny Ave Denny Ave Denny Ave Denny Ave Denny Ave Denny Ave Dennar Road

Themapdisplayalwaysshowsthevehicle'sdirectionasproceedingtowardthetopofthe screen.

When "Headingup" modeisselected, displayed.

PIONEER CNSD-250FM - Switchingthemapmode - 3

2Dmapscreen(Northupmode)
(1 10)EB (1 5)SB SAN BERNARDINO, Santa Ana 10:01 5.0 mi (1 10)EB (1 5)SB SAN BERNARDINO, Santa Ana 5.7 mi Yucca St N. Sownd N. Palschwood Dr. Carson Dr. N. Brentson Ave. Hollywood Blvd. Carton Way. 1000 ft 6.4 mi 9:28 OFF Hollywood Fwy (US 101/NB)

Themapdisplayalwayshasnorthatthetopof thescreen.

When "Northup" modeisselected, played.

PIONEER CNSD-250FM - Switchingthemapmode - 5

3Dmapscreen
0.4m N Alameda St N Loa Alameda St Judge John Ako St E Commercial St E Temple St E Temple St Ducommun St Jachere St N Alameda St iPod

Whenthe3Dmapscreenisselected,is displayed.

PIONEER CNSD-250FM - Switchingthemapmode - 7

1PresstheMAPbuttontodisplaythenavigationmapscreen.

Changesontheupgradedprogram

2Touchthemapmodeselectortoswitch themapdisplay.

Eachtouchofthemapmodeselectorchanges themapdisplayasfollows:

2Dmapscreen(Headingupmode)—2Dmap screen(Northupmode)—3Dmapscreen

Hidingcontrolsfortiltand rotationangle

Touching hidesthetilt controls and rotation angle.

10:46 Ventura Ave 134 710 1000 ft Valley St 710 Pasolone Ave W Del Mar Blvd 190 California Ter 41 mi 47:35 iPod

Controlsfortiltandrotationangle

SearchingforPOIsaroundthe address

1Touch[Destination]onthe"TopMenu", andthentouch[POI].

2Touch[Aroundenteredaddress].

Find POI Around Current GPS Location Around Destination Around Cursor Along Route Around Address Saved Criteria Register Search Criteria

3Entertheaddressyouwant.

Find address Country: CA, United States State: In California City: Los Angeles History Street: House #: City Center Street Center Intersection

□Ifthehousenumberyouhaveenteredis notfound, amessageappears. In that case, ahousenumbernearenteredoneisselectedaftertouching [OK].

4Touchthecategoryyouwant.

Find POI 1/4 Name Distance Accommodation Airport Business Car Dealer/Repair Car Rental Search All

If there are more detailed categories within the selected category, repeat this step as many times as necessary.

Touch[Search]tosearchforaPOIbyentering thePOInameintheselectedcategory.

Touching[All]listsallIPOlsthatareincluded inthecategoriescurrentlydisplayed.

5TouchthePOIyouwant.

Find POI 1/60 Name Distance US Post Office 2.5mi 2010 W Newport Plan, Stanton 19804 US Post Office 3.5mi 401 Oglestown Rd, Newark 19711 US Post Office 3.5mi 3414 Old Capital Ttl, Marshurban 19808 US Post Office 3.6mi 245 Polaski Hwy, Bear 19701 US Post Office 4.2mi 120 E Main St, Newark 19711 Search

Changesontheupgradedprogram

□Touchingthe[Name]tabsortstheoptions inthelistinalalphabeticalorder.
□Touchingthe[Distance]tabsortstheoptionsinthelistinorderbydistance.

6Touchoneoftheoptionsatthebottom oftheMapconfirmationscreentoselect thenextoperation.

Monterey Park, CA Potrero Grande Dr Monterey Park, CA 91755 California United States Map Save as... Route... Info Call

Touch[Route...] then[GoHereNow] toset yourselected position as your destination and calculate etherouteup that point.

FordetailsofotheroperationsontheMap confirmationscreen, refertotheOperation Manualofyournavigationsystem.

Browsinginformationon MSNDirect

OtherMSNDirectserviceswillbeactivatedby thisupgrade.Checkingthetrafficflowcanbe availableinadditiontotrafficevent.Browsing newsheadlines,localeventsandstockquotes willalsobeavailable.

Thischangeisavailableforthefollowing modelsonlyevenifthesoftwareprogramis updated.

AVIC-F500BT, AVIC-F900BT, AVIC-F90BT

IMPORTANT:

ToreceiveMSN ^® DirectionanMSNDirect-ready device,youmustbewithinanMSNDirectcover-agearea;seewww.msndirect.comforcurrent coveragemaps.Coverageareasareaffectedby receptionlimitationsoftheFMnetworkaswellas otherfactors,whichmayaffecttheabilitytore-ceiveFMbroadcasts.Coverageareasaresubject

tochange.Notallcontentisavailableinallcover-ageareas.

©2010MicrosoftCorporation.Allrightsreserved. Microsoft,MSN,andtheMSNlogoaretrade-marksoftheMicrosoftgroupofcompanies.

NoticeaboutMSNDirect

Pioneerisnotresponsiblefortheaccuracyofthe MSNDirectcontent.TheMSNDirectcontent maynotbecurrentoravailableattimes, and is subjecttochangewithoutnotice.

Viewingthetrafficflow

TrafficInformationisdisplayedonascreenin theformofalist. This allowsyoutocheckhow manytrafficincidentshaveoccurred, their locationandtheirdistancefromyourcurrentposition.

Although the MSNDirectserviceregularlyupdatetrafficinformation, the information provided may not necessarily correspond to actual traffic conditions. Pleasereferto Noticeabout MSNDirectonthispage.

1Touch[Destination]onthe"TopMenu", andthentouch[MSNDirect].

2Touch[Traffic].

3Touch[TrafficFlow].

Traffic Events Hwy 60 Hwy 60 Eastbound 7th Ave • Hagienda Blvd 7.5 km Lanes closed. 1 215 1 215 Southbound 2nd St • Mill St 65 km On ramp closed. 1 215 1 215 Northbound Inland Center Dr • Mill St 65 km Exit ramp closed. Traffic Flow Settings

Alistwithtrafficflowinformationthathas beenreceivedisshown. Thelistissortedby distancefromyourcurrentposition.

Changesontheupgradedprogram

Traffic Flow US 101 US 101 Northbound Mission Rd 1500 m Slow traffic. I 10 Westbound US 101/Santa Ana Fwy/Mission Rd 1700 m Slow traffic. US 101 US 101 Southbound I 10 1850 m Traffic flowing freely. 2/239 Traffic Events Settings ①②③ ④ ⑤

①Flow-relatedicon

②Streetorlocationanddirection

③Distancetothelocationandevent

④Switchingtotrafficeventlist

⑤Touchtochangethesettingsoftrafficinformation.

Fordetailsoftheoperation, refertothe OperationManualsuppliedwithyour navigationsystem.

4Touchtheitemyouwanttocheckits positiononthemap.

Thetrafficeventinformationdisplayedonthe mapisasfollows.

12:34 Gatein Rd 106 m Henry Ave... Gastow Dr. Songleaf Dr. Blockpark Rd. True Ave 00h 0:00 FM1 / 94.7 MHz FM

Trafficflowiconandline

• Red: averagespeedin this area is slower than 15 mph (24 km/h)

- Yellow:averagespeedinthisareaisbetween15mphto45mph(24km/hto72km/h)

- Green:averagespeedinthisareaisfaster than45mph(72km/h)(Aniconwithouta linewillbedisplayed)

Browsingnewsheadlines

Recentnewsheadlinesaredisplayedinalist.

Although the MSNDirectserviceregularlyupdatesnewsheadlines, the information provided may not necessarily correspond to current news headlines. Pleasereferto Notice about MSNDirectonthepreviouspage.

1Touch[Destination]onthe"TopMenu", andthentouch[MSNDirect].

2Touch[NewsHeadlines].

3Touchthedesirednewsheadline.

News Headlines 1/24 Mason's 3, Ginobili steal help Spurs beat Celtics 02/16/2009 10:51 sport news Obama faces tough week; stimulus, bailout on tap 02/16/2009 10:17 business headlines 108 killed in deadliest-ever Australian wildfires 02/16/2009 9:58 headline news WHO GETS WHAT: Billions to colleges and students 02/16/2009 9:58 headline news

Furtherdetailsaboutthenewsaredisplayed.

4Touch

PIONEER CNSD-250FM - Browsingnewsheadlines - 2

ortoscrollthelist.

News Headline Info Obama faces tough week; stimulus, bailout on tap 02/16/2009 10:17 President Barack Obama plunges into a difficult test of his leadership this week, struggling to get a divided Congress to agree on his economic recovery package while pitching a new plan to ease loans to consumers and businesses.

Browsinglocalevents

Thenearbyeventstobeheldinthenextfew daysaredisplayedonalist, and you can see the detailed event information.

Changesontheupgradedprogram

Although the MSNDirectserviceregularly updates localeventinformation, the information provided may not necessarily correspond to actual localevent conditions. Pleasereferto NoticeaboutMSNDirectonpage30.

1Touch[Destination]onthe"TopMenu", andthentouch[MSNDirect].

2Touch[LocalEvents].

Therecentlocaleventsaredisplayedinalist.

3Touchthedesiredeventtodisplaydetailedinformationoftheevent.

Local Event List 1/3 Name Time Distance Javier Vergara Quartet 02/17/2009 7.2 mi Club Dublin's 02/18/2009 6.1 mi Pro Blues Jam 02/18/2009 13.1 mi Steel Rod 02/18/2009 15.9 mi All-Star Pro Jam 02/18/2009 14.6 mi

Availableoptions:

  • Name:
    Sortstheitemsinthelistalphabetically.
  • Distance:
    Sortstheitemsinthelistinorderbydistancefromthevehicleposition.
    • Time:
    Sortstheitemsinthelistinorderbythe timewhentheeventisopened.

4Touch[Select]todisplaytherewiththe map.

Local Event Info All-Star Pro Jam Start: 02/18/2009 12:00 End: 02/19/2009 12:00 Address: 1434 4th St, Santa Monica, CA 90401 Category: Music, Funk, Soul & R&B Phone: (310) 395-1676 Admission info: select

TheMapconfirmationscreenappears.

5Touchoneoftheoptionsatthebottom oftheMapconfirmationscreentoselect thenextoperation.

FordetailsofotheroperationsontheMap confirmationscreen, refertotheOperation Manualofyournavigationsystem.

Browsingstockquotes

Recentstockquotesaredisplayedinalist.

Although the stock quoted displayed on screen is updated about 40 minutes (approx.), these prices are not real time values. It may take up to 20 minutes for all the date to become available under the following conditions:

  • WhenyouuseMSNDirectforthefirsttime.
  • When you havenot performed this function previously around the current area.
    • Afterthenavigationsystemhasbeen turnedoffforafewdays.
    PleaserefertoNoticeaboutMSNDirecton page30.

Changesontheupgradedprogram

Selectingstocksymbols

1Touch[Destination]onthe"TopMenu", andthentouch[MSNDirect].

2Touch[StockQuotes].

☐Theblanklistappearswhennosymbolsare selected.

3Touch[SelectStocks].

Stock Quotes 1/8 $INDU 8280.59 +217.52 +2.70% Dow Jones 02/06/2009 6:08 ET AAPL 99.72 +3.26 +3.38% Apple Inc. 02/06/2009 4:10 ET AIG 1.06 +0.02 +1.92% American Int'l. Group 02/09/2009 9:43 ET AT 71.46 +0.00 +0.00% 02/09/2009 9:43 ET Select Stocks

☐Arrowintheleftofeachitemindicatesthe stockpricemovement.Ifthereisnostock pricemovementsthanpreviousclose,"—" isdisplayed.

4Touchthestocksymbolthatyouwant toadd.

Whenyoutouchthesymbol,acheckmarkappearsindicatingthatitisselected.

☐Tocanceltheselection,removethecheck markbytouchingtheitemagain.

5Touch.

PIONEER CNSD-250FM - 5Touch. - 1

Viewingthedetailedstockquotes

1Touch[Destination]onthe"TopMenu", andthentouch[MSNDirect].

2Touch[StockQuotes].

3Touchthedesiredstockquote.

Stock Quote Details AAPL Apple Inc. Price: 99.72 Change: +3.26 Change percentage: +3.38% Quote time: 02/06/2009 4:10 ET Day low: 97.00 Day high: 100.00 Volume: 24.5 M

Detailedstockquoteinformationisdisplayed.

AVfunctions

Selectingatrackfromthelist

Thelistletsyouseethelistoftracktitles, file namesorfoldernamesonadiscandselect oneofthemtoplay.

1Touch[List].

2Touchthetrackyouwanttoplay.

USB Folder 0002 Track 0001 MP3 Current: Navigation 000 min 19 sec EQ Func Video : Navi 1 : Brilliance.mp3 2 : Driveit.mp3 3 : Eye-to-eye.mp3 4 : Furtherintegration.mp3 5 : Lightlove.mp3 Detail Map

(e.g.USB)

The track currently playing is highlighted. Touching 1 or switch the selection to the next or previous page in the list.

□Adash(−)isdisplayedifthereisnocorrespondinginformation.

3Toreturntothepreviousscreen,touch [Detail].

Changesontheupgradedprogram

SettingsMenu

TexturedPolygons

Thesettinghasbeenchangedsothatthesystemalwayscandrawthemapgraphically.

POISettings

"Manage POI" changes to "POI Settings" and the position of key has been moved.

1Touch[MapVisual]onthe"NaviSettings"menu.

The "MapVisualSettings" screenappears.

2Touch[POISettings].

Map Visual Settings POI Settings 3D Settings Map Settings Displayed Info Smart Zoom On Off Overview Mode On Off Manage Track Logs

DisplayedInfo

The character on the Multi-Infowindowware enlarged.

1.4 mi » Forest Lawn Drive 134 Burbank 3.0 mi 5:02 Burbank (Los Angeles), Ventura Fwy (HWY 134/WB) iPod

1Touch[MapVisual]onthe"NaviSettings"menu.

The "MapVisualSettings" screenappears.

2Touch[DisplayedInfo].

The "DisplayedInfo" screenappears.

3Touchthekeyontherightof"Top field:"todisplaytheoptions.

Displayed Info Top field: Dist. to destination Bottom field: Time to dest.

4Touchyourdesiredoption.

Displayed Info Dist. to destination Time to dest. Arrival at dest. Time to next via point Dist. to next via point Arrival at next via point

ManageTrackLogs

[Exportall] and [Deleteall] keys are added.

1Touch[MapVisual]onthe"NaviSettings"menu.

The "MapVisualSettings" screenappears.

2Touch[ManageTrackLogs].

Alistoftracklogsalreadyrecordedappears.

3Touchthedesiredtracklogonthelist.

Manage Track Logs Currently recorded track log Currently recorded track log Record Export all Track Log Options

Moredetailsaboutthetracklogappears.

Changeson theupgraded program

□Touching[Exportall]exportsalltracklogs currentlystoredtotheexternalstoragedevice(USBorSD)atonce.

4Touchthedesiredkeytooperateit.

Track Information Track log start: 04/11/2008 11:57:04 am Track log end: 04/11/2008 12:02:22 pm Track log duration: 0:05:18 Average speed: 12 mph Total distance: 1.1 mi Color on the map: Rename Export Delete Delete all

Deleteall:

Touchingthiskeydeletesalltracklogs.

Changesofdefaultvalue

SettingsMenu

MenuitemsBeforeup-gradeAfterup-grade
BackCameraOffOn
AV1InputOffiPod
WarnWhenSpeed-ingOnOff
MUTEInput/GUIDEMUTEATT

PIONEER CNSD-250FM - Changesofdefaultvalue - 1

RestoreFactorySettings

Resetsvarioussettingsregisteredtothenavigationsystemandrestoresthemtothedefault orfactorysettings.

☐ Some data remains. Be sure to read Setting itemstobedeletedfirst.
Fordetailedinformationabouttheitems whichwouldbeerased,refertoSetting itemstobedeletedonthenextpage.

1Touch[Restore/Delete]onthe"System Settings"menu.

2Touch[RestoreFactorySettings]or[Deleteuserinformation].

Restore Factory Settings Restore Factory Settings Delete user information

☐Becausedeleteddatacannotberestored, takeextracarenottomistakenlydelete items.

3Touch[OK].

Thenavigationsystemwillnowrestart.

Settingitemstobedeleted

The items to be deleted vary depending on the reset method. The items listed in the following table return to the default orfactorysettings.

Almost all items not listed below will be retained. However, some of the items to be returned to their default values are not listed if the setting value can be easily recovered by user, such as the last map scale, the last status of AV operation screen, etc.

—:Thesettingwillberetained.

√: The setting will be cleared and returned to the default factory settings.

Method1:PresstheRESETbutton.

Method2:RestoreFactorySettings

Method3: Deleteuserinformation

NavigationfunctionsMethod1Method2Method3

DestinationMenuAll settings on “MSN Direct”
“History” on “Address”
History—
Favorites—
“Saved Criteria” on “POI”
NaviSettingsSetHome—
GPS&TimeSettings,MapVisual,Route,Warnings,RegionalSettings—√
Soundsettings“Voice”, “Keys”, “Dynamic Volume (On/Off)”—√
Soundsettings“Master”, “Dynamic Volume (Maximum speed:Minimumspeed:)”
SystemSettingsLanguage—√
Othersettings
OthersPinicondata
Anti-theftpassword
AudiofunctionsMethod1Method2Method3
AVSettingsWide Mode, VR Catalog Mode
Other settings
AV SoundAll settings
CD,ROM,DivX,FM,AMAll settings (*1)
DVD-V, DVD-VRAll settings
SD, USBAll settings (*1)
Volume setting for AV sources

(*1) All settings including the setting on the "Function" menu are deleted.

Changesontheupgradedprogram

PhonefunctionsMethod1Method2Method3
PhoneMenu(*2)PhoneVolume—
ReceivedCalls—
DialedNumbers—
MissedCalls—
PhoneSettings—
Contacts(*2)Allentries—

(*2)Allstoreddataof3usersisdeleted.

PIONEER CNSD-250FM - Changesontheupgradedprogram - 1

Troubleshooting

Problemsintheproceduresforupdating

SymptomCauseAction(Reference)

Theupgradeprocessdoesn't startandthenavigationsystem bootsupasusual.ThewrongupgradeSDmemory cardisinserted.EjecttheupgradeSDmemorycard,andthen insertthecorrectupgradeSDmemorycard. (Page5)
UpgradeSDmemorycardhasbeen insertedwhilethenavigationsystem areturnedon.TurntheignitionswitchOFFandbackONto rebootthenavigationsystem.
Thescreenthatcannotbeginthe upgradeprocessisdisplayed.EjecttheupgradeSDmemorycard,anddis-playthemapofyourcurrentposition,and thenreinsertthecard.

PIONEER CNSD-250FM - Problemsintheproceduresforupdating - 1

Messagesintheproceduresforupdating

MessageWhenWhattodo

Anerorhasoccurredandupdatehasfailed.Consultyour dealerorPioneerservicecenter.Failedtoupgradethedataforsome reason.ConsultyourauthorizedPioneerdealer.

PIONEER CNSD-250FM - Messagesintheproceduresforupdating - 1

PIONEER CNSD-250FM - Messagesintheproceduresforupdating - 2

natural_image Simple horizontal line with rounded ends and a small black rounded rectangle on the right end (no text or symbols)

Register your product at

http://www.pioneerelectronics.com

in Canada http://www.pioneerelectronics.ca

See "Visit our website" page

PIONEERCORPORATION

1-1, Shin-ogura, Saiwai-ku, Kawasaki-shi,

Kanagawa212-0031, JAPAN

PIONEERELECTRONICS(USA)INC.

P.O.Box1540, LongBeach, California90801-1540, U.S.A.

TEL:(800)421-1404

PIONEEREUROPENV

Haven1087, Keetberglaan1, B-9120Melsele, Belgium/Belgique

TEL:(0)3/570.05.11

PIONEERELECTRONICSASIACENTREPTE.LTD.

253AlexandraRoad,#04-01,Singapore159936

TEL:65-6472-7555

PIONEERELECTRONICSAUSTRALIAPTY.LTD.

5ArcoLane,Heatherton,Victoria,3202,Australia

TEL:(03)9586-6300

PIONEERELECTRONICSOFCANADA, INC.

300AllstateParkway, Markham, OntarioL3R0P2, Canada

TEL:1-877-283-5901

TEL:905-479-4411

PIONEERELECTRONICSDEMEXICO,S.A.deC.V.

Blvd.ManuelAvilaCamacho13810piso

Col.LomasdeChapultepec,Mexico,D.F.11000

TEL:55-9178-4270

先鋒股份有限公司

總公司:台北市中山北路二段44號13樓

電話:(02)2521-3588

先鋒電子(香港)有限公司

PublishedbyPioneerCorporation.

Copyright©2010byPioneerCorporation.

Allrightsreserved.

Table of contents Click a title to access it
Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : PIONEER

Model : CNSD-250FM

Category : Browser