Hikvision DS-K1T671TM-3XF - Access Control

DS-K1T671TM-3XF - Access Control Hikvision - Free user manual and instructions

Find the device manual for free DS-K1T671TM-3XF Hikvision in PDF.

📄 227 pages English EN Download 💬 AI Question 10 questions ⚙️ Specs
Notice Hikvision DS-K1T671TM-3XF - page 2
Pick your language and provide your email: we'll send you a specifically translated version.
Product Type Access Control Terminal
Brand Hikvision
Model DS-K1T671TM-3XF
Authentication Methods Face recognition, fingerprint, card (Mifare/IC), password
Display 7-inch capacitive touch screen, 1024x600 resolution
Camera 2 MP wide-angle camera with IR LED for face recognition
Fingerprint Sensor Capacitive sensor, 500 DPI
Card Reading 13.56 MHz (Mifare, ISO14443A/B, NFC)
Communication TCP/IP, Wi-Fi (optional), RS-485, Wiegand input/output
User Capacity Up to 100,000 users (face, fingerprint, card)
Face Recognition Capacity Up to 50,000 faces
Fingerprint Capacity Up to 50,000 fingerprints
Card Capacity Up to 100,000 cards
Event Log Up to 500,000 events
Power Supply 12V DC / 2A (PoE optional)
Power Consumption ≤ 24W
Dimensions (W×H×D) 303 × 139 × 44 mm
Weight Approx. 1.5 kg
Operating Temperature -10°C to 55°C
Protection Rating IP65 (indoor/outdoor)
Mounting Wall mount with included bracket
Maintenance Clean screen with soft dry cloth; avoid liquids
Repairability Modular design; contact authorized service center
Accessories Included Mounting bracket, screws, power adapter

Frequently Asked Questions - DS-K1T671TM-3XF Hikvision

What is the default IP address of the DS-K1T671TM-3XF?
The default IP address is 192.0.0.64. You can change it via the device menu or Hikvision software.
Can the DS-K1T671TM-3XF be used outdoors?
Yes, it has an IP65 rating, making it suitable for outdoor use. However, avoid direct rain and extreme temperatures.
How do I add users to the terminal?
You can add users via the device's web interface (Hikvision Access Control) or through the local menu. Go to User Management and select Add User.
Does it support PoE?
Yes, the device supports Power over Ethernet (PoE) with IEEE 802.3af/at standard. Alternatively, you can use a 12V DC adapter.
How many fingerprints can be stored?
The terminal can store up to 50,000 fingerprints. It uses a capacitive sensor with high accuracy.
Can I connect it to a third-party access control system?
Yes, it supports Wiegand input/output and RS-485, allowing integration with most access controllers.
What maintenance does the device require?
Regularly clean the screen and camera lens with a soft, dry cloth. Avoid using chemical cleaners or water. Ensure the firmware is updated.
Is face recognition affected by masks?
The device supports face recognition with masks; however, recognition accuracy may decrease. It can also use alternative methods like card or fingerprint.
How do I reset the device to factory settings?
Press and hold the reset button (located near the SD card slot) for 10 seconds until the device reboots. Alternatively, use the web interface.
What is the warranty period?
The standard warranty is 2 years from the date of purchase. Contact Hikvision or your distributor for details.

User questions about DS-K1T671TM-3XF Hikvision

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Access Control in PDF format for free! Find your manual DS-K1T671TM-3XF - Hikvision and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. DS-K1T671TM-3XF by Hikvision.

USER MANUAL DS-K1T671TM-3XF Hikvision

©2021 Hangzhou Hikvision Digital Technology Co., Ltd. All rights reserved.

About this Manual

The Manual includes instructions for using and managing the Product. Pictures, charts, images and all other information hereinafter are for description and explanation only. The information contained in the Manual is subject to change, without notice, due to firmware updates or other reasons. Please find the latest version of this Manual at the Hikvision website (https://www.hikvision.com/).

Please use this Manual with the guidance and assistance of professionals trained in supporting the Product.

Trademarks

HIKVISION and other Hikvision's trademarks and logos are the properties of Hikvision in various jurisdictions.

Other trademarks and logos mentioned are the properties of their respective owners.

Disclaimer

TO THE MAXIMUM EXTENT PERMITTED BY APPLICABLE LAW, THIS MANUAL AND THE PRODUCT DESCRIBED, WITH ITS HARDWARE, SOFTWARE AND FIRMWARE, ARE PROVIDED "AS IS" AND "WITH ALL FAULTS AND ERRORS". HIKVISION MAKES NO WARRANTIES, EXPRESS OR IMPLIED, INCLUDING WITHOUT LIMITATION, MERCHANTABILITY, SATISFACTORY QUALITY, OR FITNESS FOR A PARTICULAR PURPOSE. THE USE OF THE PRODUCT BY YOU IS AT YOUR OWN RISK. IN NO EVENT WILL HIKVISION BE LIABLE TO YOU FOR ANY SPECIAL, CONSEQUENTIAL, INCIDENTAL, OR INDIRECT DAMAGES, INCLUDING, AMONG OTHERS, DAMAGES FOR LOSS OF BUSINESS PROFITS, BUSINESS INTERRUPTION, OR LOSS OF DATA, CORRUPTION OF SYSTEMS, OR LOSS OF DOCUMENTATION, WHETHER BASED ON BREACH OF CONTRACT, TORT (INCLUDING NEGLIGENCE), PRODUCT LIABILITY, OR OTHERWISE, IN CONNECTION WITH THE USE OF THE PRODUCT, EVEN IF HIKVISION HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES OR LOSS.

YOU ACKNOWLEDGE THAT THE NATURE OF THE INTERNET PROVIDES FOR INHERENT SECURITY RISKS, AND HIKVISION SHALL NOT TAKE ANY RESPONSIBILITIES FOR ABNORMAL OPERATION, PRIVACY LEAKAGE OR OTHER DAMAGES RESULTING FROM CYBER-ATTACK, HACKER ATTACK, VIRUS INFECTION, OR OTHER INTERNET SECURITY RISKS; HOWEVER, HIKVISION WILL PROVIDE TIMELY TECHNICAL SUPPORT IF REQUIRED.

YOU AGREE TO USE THIS PRODUCT IN COMPLIANCE WITH ALL APPLICABLE LAWS, AND YOU ARE SOLELY RESPONSIBLE FOR ENSURING THAT YOUR USE CONFORMS TO THE APPLICABLE LAW. ESPECIALLY, YOU ARE RESPONSIBLE, FOR USING THIS PRODUCT IN A MANNER THAT DOES NOT INFRINGE ON THE RIGHTS OF THIRD PARTIES, INCLUDING WITHOUT LIMITATION, RIGHTS OF PUBLICITY, INTELLECTUAL PROPERTY RIGHTS, OR DATA PROTECTION AND OTHER PRIVACY RIGHTS. YOU SHALL NOT USE THIS PRODUCT FOR ANY PROHIBITED END-USES, INCLUDING THE

DEVELOPMENT OR PRODUCTION OF WEAPONS OF MASS DESTRUCTION, THE DEVELOPMENT OR PRODUCTION OF CHEMICAL OR BIOLOGICAL WEAPONS, ANY ACTIVITIES IN THE CONTEXT RELATED TO ANY NUCLEAR EXPLOSIVE OR UNSAFE NUCLEAR FUEL-CYCLE, OR IN SUPPORT OF HUMAN RIGHTS ABUSES.

IN THE EVENT OF ANY CONFLICTS BETWEEN THIS MANUAL AND THE APPLICABLE LAW, THE LATTER PREVAILS.

Data Protection

During the use of device, personal data will be collected, stored and processed. To protect data, the development of Hikvision devices incorporates privacy by design principles. For example, for device with facial recognition features, biometrics data is stored in your device with encryption method; for fingerprint device, only fingerprint template will be saved, which is impossible to reconstruct a fingerprint image.

As data controller, you are advised to collect, store, process and transfer data in accordance with the applicable data protection laws and regulations, including without limitation, conducting security controls to safeguard personal data, such as, implementing reasonable administrative and physical security controls, conduct periodic reviews and assessments of the effectiveness of your security controls.

Symbol Conventions

The symbols that may be found in this document are defined as follows.

Symbol Description
Hikvision DS-K1T671TM-3XF - Symbol Conventions - 1 DangerIndicates a hazardous situation which, if not avoided, will or could result in death or serious injury.
Hikvision DS-K1T671TM-3XF - Symbol Conventions - 2 CautionIndicates a potentially hazardous situation which, if not avoided, could result in equipment damage, data loss, performance degradation, or unexpected results.
Hikvision DS-K1T671TM-3XF - Symbol Conventions - 3 NoteProvides additional information to emphasize or supplement important points of the main text.

Regulatory Information

FCC Information

Please take attention that changes or modification not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment.

FCC compliance: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures:

—Reorient or relocate the receiving antenna.

—Increase the separation between the equipment and receiver.

—Connect the equipment into an outlet on a circuit different from that to which the receiver is connected.

—Consult the dealer or an experienced radio/TV technician for help

This equipment should be installed and operated with a minimum distance 20cm between the radiator and your body.

FCC Conditions

This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions:

  1. This device may not cause harmful interference.

  2. This device must accept any interference received, including interference that may cause undesired operation.

EU Conformity Statement

Hikvision DS-K1T671TM-3XF - EU Conformity Statement - 1

This product and - if applicable - the supplied accessories too are marked with "CE" and comply therefore with the applicable harmonized European standards listed

under the EMC Directive 2014/30/EU, RE Directive 2014/53/EU, the RoHS Directive 2011/65/EU

Hikvision DS-K1T671TM-3XF - EU Conformity Statement - 2

2012/19/EU (WEEE directive): Products marked with this symbol cannot be disposed of as unsorted municipal waste in the European Union. For proper recycling, return this product to your local supplier upon the purchase of equivalent new equipment, or dispose of it at designated collection points. For more information see: www.recyclethis.info

Hikvision DS-K1T671TM-3XF - EU Conformity Statement - 3

2006/66/EC (battery directive): This product contains a battery that cannot be disposed of as unsorted municipal waste in the European Union. See the product documentation for specific battery information. The battery is marked with this symbol, which may include lettering to indicate cadmium (Cd), lead (Pb), or mercury (Hg). For proper recycling, return the battery to your supplier or to a designated collection point. For more information see:www.recyclethis.info

This device complies with Industry Canada licence-exempt RSS standard(s). Operation is subject to the following two conditions:

(1) this device may not cause interference, and
(2) this device must accept any interference, including interference that may cause undesired operation of the device.

These instructions are intended to ensure that user can use the product correctly to avoid danger or property loss.

The precaution measure is divided into Dangers and Cautions:

Dangers: Neglecting any of the warnings may cause serious injury or death.

Cautions: Neglecting any of the cautions may cause injury or equipment damage.

Dangers: Follow these safeguards to prevent serious injury or death.Cautions: Follow these precautions to prevent potential injury or material damage.

Hikvision DS-K1T671TM-3XF - EU Conformity Statement - 4

Danger:

  • All the electronic operation should be strictly compliance with the electrical safety regulations, fire prevention regulations and other related regulations in your local region.
  • Please use the power adapter, which is provided by normal company. This equipment is intended to be supplied from the Class 2 surge protected power source rated 12 VDC, 2 A.
  • Do not connect several devices to one power adapter as adapter overload may cause over-heat or fire hazard.
  • Please make sure that the power has been disconnected before you wire, install or dismantle the device.
  • When the product is installed on wall or ceiling, the device shall be firmly fixed.
  • If smoke, odors or noise rise from the device, turn off the power at once and unplug the power cable, and then please contact the service center.
  • Do not ingest battery, Chemical Burn Hazard.

This product contains a coin/button cell battery. If the coin/button cell battery is swallowed, it can cause severe internal burns in just 2 hours and can lead to death.

Keep new and used batteries away from children. If the battery compartment does not close securely, stop using the product and keep it away from children. If you think batteries might have been swallowed or placed inside any part of the body, seek immediate medical attention.

- If the product does not work properly, please contact your dealer or the nearest service center. Never attempt to disassemble the device yourself. (We shall not assume any responsibility for problems caused by unauthorized repair or maintenance.)

Hikvision DS-K1T671TM-3XF - Danger: - 1

Cautions:

  • Do not drop the device or subject it to physical shock, and do not expose it to high electromagnetism radiation. Avoid the equipment installation on vibrations surface or places subject to shock (ignorance can cause equipment damage).
  • Do not place the device in extremely hot (refer to the specification of the device for the detailed operating temperature), cold, dusty or damp locations, and do not expose it to high electromagnetic radiation.
  • The device cover for indoor use shall be kept from rain and moisture.
  • Exposing the equipment to direct sun light, low ventilation or heat source such as heater or radiator is forbidden (ignorance can cause fire danger).
  • Do not aim the device at the sun or extra bright places. A blooming or smear may occur otherwise (which is not a malfunction however), and affecting the endurance of sensor at the same time.
  • Please use the provided glove when open up the device cover, avoid direct contact with the device cover, because the acidic sweat of the fingers may erode the surface coating of the device cover.
  • Please use a soft and dry cloth when clean inside and outside surfaces of the device cover, do not use alkaline detergents.
  • Please keep all wrappers after unpack them for future use. In case of any failure occurred, you need to return the device to the factory with the original wrapper. Transportation without the original wrapper may result in damage on the device and lead to additional costs.
  • Improper use or replacement of the battery may result in hazard of explosion. Replace with the same or equivalent type only. Dispose of used batteries according to the instructions provided by the battery manufacturer.
  • Biometric recognition products are not completely applicable to anti-spoofing environments. If you require a higher security level, use multiple authentication modes.
  • Working temperature: 0 °C to 50 °C; Working humidity: 10% to 90% (no condensing)
  • Indoor use. The device should be at least 2 meters away from the light, and at least 3 meters away from the window.
    • Version: 1.0, Issue Date: 20200519
  • Outdoor use or use in environment exceeding the device temperature measurement will affect the temperature measurement accuracy.

Available Models

Product Name Model
Face Recognition Terminal DS-K1T671TM-3XF

Use only power supplies listed in the user instructions:

Model Manufacturer Standard
C2000IC12.0-24P-DE MOSO Power Supply Technology Co., Ltd.CEE
C2000IC12.0-24P-GB MOSO Power Supply Technology Co., Ltd.BS
KPL-040F-VI Channel Well Technology Co Ltd.CEE

Contents

Chapter 1 Overview ...... 1

1.1 Overview ...... 1
1.2 Features .... 1

Chapter 2 Appearance .... 3

Chapter 3 Installation .... 5

3.1 Installation Environment 5
3.2 Flush Mounting 5
3.3 Surface Mounting 7

Chapter 4 Wiring ...... 10

4.1 Terminal Description 10
4.2 Wire Normal Device 12
4.3 Wire Secure Door Control Unit 13
4.4 Wire Fire Module 14

4.4.1 Wiring Diagram of Door Open When Powering Off 14
4.4.2 Wiring Diagram of Door Locked When Powering Off 16

Chapter 5 Activation ...... 18

5.1 Activate via Device 18
5.2 Activate via SADP 20
5.3 Activate Device via Client Software 21
5.4 Activate via Web Browser 21

Chapter 6 Quick Operation ...... 23

6.1 Select Language 23
6.2 Set Password Change Type 24
6.3 Set Application Mode 25
6.4 Set Network Parameters 26
6.5 Access to Platform 27

6.6 Privacy Settings 28
6.7 Set Administrator 30

Chapter 7 Basic Operation ...... 32

7.1 Login 32

7.1.1 Login by Administrator 32
7.1.2 Login by Activation Password 34
7.1.3 Forgot Password 35

7.2 Communication Settings 37

7.2.1 Set Wired Network Parameters 37
7.2.2 Set Wi-Fi Parameters 38
7.2.3 Set RS-485 Parameters 40
7.2.4 Set Wiegand Parameters 40
7.2.5 Set ISUP Parameters 41
7.2.6 Platform Access 43

7.3 User Management 43

7.3.1 Add Administrator 43
7.3.2 Add Face Picture 44
7.3.3 Add Card 46
7.3.4 View Password 47
7.3.5 Set Authentication Mode 48
7.3.6 Search and Edit User 48

7.4 Data Management 49

7.4.1 Delete Data 49
7.4.2 Import Data 49
7.4.3 Export Data 49

7.5 Identity Authentication 50

7.5.1 Authenticate via Single Credential 50
7.5.2 Authenticate via Multiple Credential 51

7.6 Basic Settings 51
7.7 Set Biometric Parameters 53
7.8 Set Access Control Parameters 55
7.9 Time and Attendance Status Settings 56

7.9.1 Disable Attendance Mode via Device 56
7.9.2 Set Manual Attendance via Device 57
7.9.3 Set Auto Attendance via Device 58
7.9.4 Set Manual and Auto Attendance via Device 59

7.10 System Maintenance 61
7.11 Preference Settings 62
7.12 Video Intercom 64

7.12.1 Call Client Software from Device 64
7.12.2 Call Center from Device 65
7.12.3 Call Device from Client Software 66
7.12.4 Call Room from Device 66
7.12.5 Call Mobile Client from Device 67

7.13 Temperature MeasurementSettings 67

Chapter 8 Operation via Web Browser 70

8.1 Login 70
8.2 Forget Password 70
8.3 Live View 71
8.4 Person Management 72
8.5 Search Event 73
8.6 Configuration 73

8.6.1 Set Local Parameters ...... 73
8.6.2 View Device Information 73
8.6.3 Set Time 74
8.6.4 Set DST 74

8.6.5 View Open Source Software License 75
8.6.6 Upgrade and Maintenance 75
8.6.7 Log Query 76
8.6.8 Security Mode Settings 76
8.6.9 Certificate Management 77
8.6.10 Change Administrator's Password 78
8.6.11 Account Security Settings 79
8.6.12 View Device Arming/Disarming Information 79
8.6.13 Network Settings 79
8.6.14 Set Video and Audio Parameters 83
8.6.15 Customize Audio Content 84
8.6.16 Set Image Parameters 86
8.6.17 Set Supplement Light Brightness 87
8.6.18 Time and Attendance Settings 88
8.6.19 General Settings 90
8.6.20 Video Intercom Settings 95
8.6.21 Access Control Settings 97
8.6.22 Set Biometric Parameters ...... 100
8.6.23 Set Theme 104
8.6.24 Temperature Measurement Settings 105

Chapter 9 Client Software Configuration .... 109

9.1 Configuration Flow of Client Software 109
9.2 Device Management 109

9.2.1 Add Device 110
9.2.2 Reset Device Password 118

9.3 Group Management 119

9.3.1 Add Group 119
9.3.2 Import Resources to Group 119

9.3.3 Edit Resource Parameters 120
9.3.4 Remove Resources from Group 120
9.4 Person Management 120
9.4.1 Add Organization 121
9.4.2 Configure Basic Information 121
9.4.3 Issue a Card to One Person 122
9.4.4 Upload a Face Photo from Local PC 123
9.4.5 Take a Photo via Client 123
9.4.6 Collect Face via Access Control Device 125
9.4.7 Configure Access Control Information 125
9.4.8 Customize Person Information 127
9.4.9 Configure Resident Information 128
9.4.10 Configure Additional Information 128
9.4.11 Import and Export Person Identify Information 129
9.4.12 Import Person Information 129
9.4.13 Import Person Pictures 129
9.4.14 Export Person Information 130
9.4.15 Export Person Pictures 130
9.4.16 Delete Registered Pictures 131
9.4.17 Get Person Information from Access Control Device 131
9.4.18 Move Persons to Another Organization 132
9.4.19 Issue Cards to Persons in Batch 132
9.4.20 Report Card Loss 133
9.4.21 Set Card Issuing Parameters 133
9.5 Configure Schedule and Template 134
9.5.1 Add Holiday 134
9.5.2 Add Template 135
9.6 Set Access Group to Assign Access Authorization to Persons 136

9.7 Configure Advanced Functions 138

9.7.1 Configure Device Parameters 139
9.7.2 Configure Remaining Open/Closed 144
9.7.3 Configure Multi-Factor Authentication 145
9.7.4 Configure Card Reader Authentication Mode and Schedule 147
9.7.5 Configure First Person In 149
9.7.6 Configure Anti-Passback 150
9.7.7 Configure Device Parameters 151

9.8 Configure Linkage Actions for Access Control 157

9.8.1 Configure Client Actions for Access Event 157
9.8.2 Configure Device Actions for Access Event 158
9.8.3 Configure Device Actions for Card Swiping 159
9.8.4 Configure Device Actions for Person ID 161

9.9 Door Control 162

9.9.1 Control Door Status 162
9.9.2 Check Real-Time Access Records 163

9.10 Event Center 164

9.10.1 Enable Receiving Event from Devices 164
9.10.2 View Real-Time Events 165
9.10.3 Search Historical Events 166

9.11 Time and Attendance 169

9.11.1 Configure Attendance Parameters 169
9.11.2 Add General Timetable 176
9.11.3 Add Shift 178
9.11.4 Manage Shift Schedule 180
9.11.5 Manually Correct Check-in/out Record 183
9.11.6 Add Leave and Business Trip 184
9.11.7 Calculate Attendance Data 185

9.11.8 Attendance Statistics 187

9.12 System Configuration 190

9.12.1 Set General Parameters 190

9.12.2 Set Picture Storage 191

9.12.3 Set Alarm Sound 191

9.12.4 Set Access Control and Video Intercom Parameters 192

9.12.5 Set File Saving Path 193

9.12.6 Set Email Parameters ...... 193

9.13 Operation and Maintenance 194

9.14 Remote Configuration (Web) 194

9.14.1 View Device Information 194

9.14.2 Change Device Password 195

9.14.3 Time Management 196

9.14.4 System Maintenance 197

9.14.5 Configure RS-485 Parameters 198

9.14.6 Security Mode Settings 198

9.14.7 Network Parameters Settings 199

9.14.8 Report Strategy Settings 199

9.14.9 Network Center Parameters Settings 199

9.14.10 Configure SIP Parameters 200

9.14.11 Set Relay Parameters 200

9.14.12 Set Access Control Parameters 200

9.14.13 Set Face Recognition Terminal Parameters 201

9.14.14 Configure Face Picture Parameters 202

9.14.15 Configure Supplement Light Parameters 203

9.14.16 Set Device No. 203

9.14.17 Configure Video and Audio Parameters 203

9.14.18 Configure Volume Input or Output 204

9.14.19 Operate Relay 204
9.14.20 View Relay Status 204

Appendix A. Tips When Collecting/Comparing Face Picture 205

Appendix B. Tips for Installation Environment 207

Appendix C. Dimension 208

Appendix D. Communication Matrix and Device Command 209

Chapter 1 Overview

1.1 Overview

Face recognition terminal is a kind of access control device for face recognition, which is mainly applied in security access control systems, such as logistic centers, airports, university campuses, alarm centrals, dwellings, etc.

Hikvision DS-K1T671TM-3XF - Overview - 1

This device is NOT for medical use.

1.2 Features

• Supports Vanadium Oxide uncooled sensor to measure target's temperature
- Temperature measuring range: 30 °C to 45 °C (86 °F to 113 °F), accuracy: 0.1 °C, deviation: ± 0.5 °C without black body calibration
• Recognition distance: 0.3 to 2 m
- Fast temperature measurement mode: Detects face and takes temperature without identity authentication.
- Multiple authentication modes are available: card and temperature, face and temperature, card and face and temperature, etc.
- Face mask wearing alert If the recognizing face does not wear a mask, the device will prompt a voice reminder. At the same time, the authentication or attendance is valid.
- Forced mask wearing alert If the recognizing face does not wear a mask, the device will prompt a voice reminder. At the same time, the authentication or attendance will be failed.
- Displays temperature measurement results on the authentication page
- Triggers voice prompt when detecting abnormal temperature
- Configurable door status (open/close) when detecting abnormal temperature
- Transmits online and offline temperature information to the client software via TCP/IP communication and saves the data on the client software
- Face recognition duration < 0.2 s/User; face recognition accuracy rate ≥ 99%
- 50,000 face capacity, 50,000 card capacity, and 100,000 event capacity
- Suggested height for face recognition: between 1.4 m and 1.9 m
- Supports 6 attendance status, including check in, check out, break in, break out, overtime in, overtime out
- Watchdog design and tamper function
• Audio prompt for authentication result
- NTP, manually time synchronization, and auto synchronization
- Connects to external access controller or Wiegand card reader via Wiegand protocol

  • Connects to secure door control unit via RS-485 protocol to avoid the door opening when the terminal is destroyed
  • Imports and export data to the device from the client software
    • Supports simple theme
    • Supports configuration via Web
    • Supports ISUP 5.0

Chapter 2 Appearance

Refer to the following contents for detailed information of the face recognition terminal:

116.5 mm ⑥ ⑤ ④ 282.81 mm ③ ② ⑦ ⑧

36.7 mm ⑨

①

10 11 12 13 14 15

Figure 2-1 Face Recognition Terminal Diagram

Table 2-1 Description of Face Recognition Terminal

No. Name
1 USB Interface
2 Card Swiping Area
3 Touch Screen
4 Camera
5 IR Light
6 Thermographic Module
7 IR Light
8 Camera
9 TAMPER
10 Thermographic Module Interface
11 Debugging Port
12 Power Interface
13 Wiring Terminals
14 PSAM Card Slot (Reserved)
15 Network Interface

Chapter 3 Installation

3.1 Installation Environment

  • Avoid backlight, direct sunlight, and indirect sunlight.
  • For better face recognition, there should be light source in or near the installation environment.
  • Sunlight, wind, hot/cool air from air conditioner and other external factors, which may affect temperature, will create the deviation of the temperature measurement. In order to get an accurate result, make sure the device is applied indoors and windlessly (where is relatively isolated from the outdoors). The working temperature should keep between 10 °C and 35 °C. If there are no suitable environments for temperature measurement (the area faces the indoor and connects the outdoor, the area at the door of the indoor environment, etc.), building a temporary temperature measurement environment is suggested.

• Influence Factors of Temperature Measurement:

Wind: The wind will take the heat away, which may affect the measurement result.

Sweat: The sweat will take the heat away, which may affect the measurement result.

Air Conditioner (Cool Air): If the indoor temperature is low, the temperature may also lower than the actual temperature, which may affect the measurement result.

Air Conditioner (Heat) or Heating: If the indoor temperature is high, the temperature may also be higher than the actual temperature, which may affect the measurement result.

- In order to make the device work properly, you should wait for 90 min after the device is powered on.

- For details about installation environment, see Tips for Installation Environment.

3.2 Flush Mounting

Steps

  1. Install a gang box.
  2. Use 4 supplied screws (4 KA4 × 22-SUS) to secure the mounting plate on the gang box.
  3. Remove the two screws on the rear panel and remove the sheet to display the wiring terminals.
  4. Route the cable through the cable hole of the mounting plate, and connect to corresponding external devices' cables.
  5. Install the sheet back to the device with the 2 screws.
  6. Align the device with the mounting plate and hang the device on the mounting plate.

Diagram showing a device mounted on a brick wall with directional arrows indicating movement or force, likely illustrating a mechanical or electrical system.

Figure 3-1 Install Device

  1. Use 2 supplied M4 screws to secure the device and the mounting plate.

Hikvision DS-K1T671TM-3XF - Steps - 2

When the screw's head is beneath the device surface, the device is secured.

Hikvision DS-K1T671TM-3XF - Steps - 3

natural_image Isometric illustration of a smartphone mounted on a brick wall, with red arrows indicating direction (no text or symbols)

Figure 3-2 Secure Device

  1. After installation, for the proper use of the device (outdoor use), stick the protection film (parts of models supplied) on the screen.

3.3 Surface Mounting

Steps

  1. According to the datum line on the mounting template, stick the mounting template on the wall or other surface, 1.4 meters higher than the ground.

87 mm 0 1 2 3 4 5 6 7 Hole1 Hole1 Mounting Template Paste the template on the required place.Drill screw and cable holes according to the template. The actual product's width and length may be 15mm longer than the template's. Hole 1: Wall Mounting Screw Hole Hole 2: Gang Box Screw Hole Hole 3: Cable Hole UP 196.8 mm Datum Line The recommended distances from the ground level is 1.4km and it is adjustable depends on the height of hols.

Figure 3-3 Mounting Template

  1. Drill 4 holes on the wall or other surface according to the mounting template.
  2. Insert the screw sockets of the setscrews in the drilled holes.

Hikvision DS-K1T671TM-3XF - Steps - 2
Figure 3-4 Insert Screw Socket

  1. Align the 4 holes to the mounting plate with the drilled holes.
  2. Remove the sheet indicated on the image below by using the flat tongs.

Hikvision DS-K1T671TM-3XF - Steps - 3

natural_image Technical line drawing of a laptop with a red arrow pointing to the screen area (no text or symbols present)

Figure 3-5 Remove Sheet

  1. Remove the two screws on the rear panel and remove the sheet to display the wiring terminals.
  2. Route the cable through the cable hole of the mounting plate, and connect to corresponding external devices' cables.
  3. Install the sheet back to the device with the two screws.
  4. Align the device with the mounting plate and hang the device on the mounting plate.

Hikvision DS-K1T671TM-3XF - Steps - 4

natural_image Isometric line drawing of a smartphone mounted on a brick wall, showing internal components and mounting brackets (no text or symbols)

Figure 3-6 Install Device

  1. Use 2 supplied M4 screws to secure the device and the mounting plate.

Hikvision DS-K1T671TM-3XF - Steps - 5

When the screw's head is beneath the device surface, the device is secured.

Hikvision DS-K1T671TM-3XF - Steps - 6

natural_image Isometric illustration of a smartphone mounted on a brick wall, with red arrows indicating movement or force (no text or symbols)

Figure 3-7 Secure Device

i Note

  • The installation height here is the recommended height. You can change it according to your actual needs.
  • For easy installation, drill holes on mounting surface according to the supplied mounting template.

  • After installation, for the proper use of the device (outdoor use), stick the protection film (parts of models supplied) on the screen.

Chapter 4 Wiring

You can connect the RS-485 terminal with the RS-485 card reader, connect the NC and COM terminal with the door lock, connect the SENSOR terminal with the door contact, the BTN/GND terminal with the exit button, connect the alarm output and input terminal with the alarm output/input devices, and connect the Wiegand terminal with the Wiegand card reader or the access controller.

If connect the WIEGAND terminal with the access controller, the facerecognition terminal can transmit the authentication information to the access controller and the access controller can judge whether to open the door or not.

Hikvision DS-K1T671TM-3XF - Chapter 4 Wiring - 1

Note

  • If cable size is 18 AWG, you should use a 12 V power supply. And the distance between the power supply and the device should be no more than 20 m.
  • If the cable size is 15 AWG, you should use a 12 V power supply. And the distance between the power supply and the device should be no more than 30 m.
  • If the cable size is 12 AWG, you should use a 12 V power supply. And the distance between the power supply and the device should be no more than 40 m.

4.1 Terminal Description

The terminals contains power input, alarm input, alarm output, RS-485, Wiegand output, and door lock.

The terminal's diagram is as follows:

Hikvision DS-K1T671TM-3XF - Terminal Description - 1

flowchart
graph TD
    subgraph Group A
        Red --> A1["Power Input"]
        Black --> A2["Power Input"]
        A1 --> B1["Alarm Input"]
        A2 --> B2["Alarm Input"]
        A1 --> B3["Alarm Output"]
        A2 --> B3
        A1 --> B4["Alarm Output"]
        A2 --> B4
        A1 --> B5["Alarm Output"]
        A2 --> B5
        A1 --> B6["Alarm Output"]
    end

    subgraph Group B
        Yellow --> C1["RS-485"]
        Blue --> C2["Wiegand"]
        Black --> C3["RS-485"]
        Green --> C4["RS-485"]
        White --> C5["RS-485"]
        Brown --> C6["RS-485"]
        Orange --> C7["RS-485"]
        Purple --> C8["RS-485"]
        Gray --> C9["RS-485"]
        C1 --> D1["Door Lock"]
        C2 --> D2["Door Lock"]
        C3 --> D3["Door Lock"]
        C4 --> D4["Door Lock"]
        C5 --> D5["Door Lock"]
        C6 --> D6["Door Lock"]
        C7 --> D7["Door Lock"]
        C8 --> D8["Door Lock"]
        C9 --> D9["Door Lock"]
        D1 --> E1["Group D"]
        D2 --> E2["Group D"]
        D3 --> E3["Group D"]
        D4 --> E4["Group D"]
        D5 --> E5["Group D"]
    end

Figure 4-1 Terminal Diagram

The descriptions of the terminals are as follows:

Table 4-1 Terminal Descriptions

Group No.FunctionColor Name Description
Group A A1 PowerPower Input Red +12 V 12 VDC PowerSupply
A2 Black GND Ground
Group BB1Alarm InputYellow/BlueIN1Alarm Input 1
B2Yellow/BlackGND Ground
B3Yellow/OrangeIN2Alarm Input 2
B4 Alarm OutputYellow/Purple COM NONC Alarm OutputWiring
B5 Yellow/Brown
B6 Yellow/Red NO
Group C C1 RS-485485 Yellow 485+RS-485Wiring
C2 Blue485-GND
C3 BlackGround
C4 Wiegand GreenW0WiegandWiring 0
C5 WhiteW1WiegandWiring 1
C6 BrownWG_OKWiegandAuthenticated
C7 OrangeWG_ERR WiegandAuthentication Failed
C8 PurpleBUZZERBuzzer Wiring
C9 GrayTAMPERTamperingAlarm Wiring
Group DD1Door LockWhite/PurpleNCLock Wiring (NC)
D2White/YellowCOM Common
D3White/RedNOLock Wiring (NO)
D4Yellow/GreenSENSORDoor Contact
D5Yellow/GrayBTNExit Door Wiring

4.2 Wire Normal Device

You can connect the terminal with normal peripherals.

The wiring diagram without secure door control unit is as follows.

Hikvision DS-K1T671TM-3XF - Wire Normal Device - 1

flowchart
graph TD
    A["Face Recognition Terminal"] --> B["Power Input"]
    A --> C["Alarm Input"]
    A --> D["Alarm Output"]
    A --> E["RS-485"]
    A --> F["Wiegand"]
    A --> G["Door Lock"]

    B --> H["+12V GND Group A"]
    B --> I["+12V GND Group B"]
    C --> J["IN1 GND Group B"]
    C --> K["IN2 GND Group B"]
    C --> L["NC COM NO Group B"]
    C --> M["B4 B5 B6 Group B"]

    D --> N["485+ 485- GND Group C"]
    D --> O["W0 W1 OK ERR BUZZER TAMPER Group C"]

    E --> P["Yellow/Blue Yellow/Black Yellow/Orange (NC) Power (NO)"]
    F --> Q["Green White Brown Orange Purple Gray Wiegand Card Reader"]
    G --> R["NC COM NO SENSOR BTN Group D"]

    H --> S["Alarm Input Device"]
    I --> T["Alarm Output Device"]
    J --> U["External Power Supply"]
    K --> V["Electric Dropbolt (NC)"]
    L --> W["Electric strike (NO)"]

    G --> X["Exit Button"]

Figure 4-2 Device Wiring

Hikvision DS-K1T671TM-3XF - Wire Normal Device - 2

Note

  • You should set the face recognition terminal's Wiegand direction to "Input" to connect to a Wiegand card reader. If connects to an access controller, you should set the Wiegand direction to "Output" to transmit authentication information to the access controller.
  • For details about Wiegand direction settings, see Setting Wiegand Parameters in Communication Settings.
  • The power supply for the device should be 12 VDC/2 A. The suggested external power supply for door lock is 12 V, 1 A. The suggested external power supply for the Wiegand card reader is 12 V, 1A.
    • The suggested power cable's diameter: 22 AWG. The suggested other cable's diameter: 26 AWG.
  • Do not wire the device to the electric supply directly.

Hikvision DS-K1T671TM-3XF - Note - 1

Warning

The face recognition terminal shall adapt an external listed Class 2 power supply with surge protected function.

4.3 Wire Secure Door Control Unit

You can connect the terminal with the secure door control unit.

The wiring diagram is as follows.

Hikvision DS-K1T671TM-3XF - Wire Secure Door Control Unit - 1

flowchart
graph LR
    A["Face Recognition Terminal"] --> B["RS485"]
    B --> C["485+ 485 C1 Yellow Blue"]
    C --> D["Secure Door Control Unit Wiring Terminal"]
    D --> E["Power Input"]
    E --> F["+12V GND A1 Red +12V A2 Black GND"]
    D --> G["Sensor Input"]
    G --> H["SENSOR B1 GND B2 Black"]
    D --> I["Exit Button"]
    I --> J["BIN B3 GND B4 Black"]
    D --> K["Lack Output"]
    K --> L["NC COM C2 NO"]
    K --> M["White/Purple White/Black White/Red"]
    M --> N["Power"]
    N --> O["Electric Dropbolt"]
    N --> P["Electric Strike"]
    Q["Door Contact"] --> R["Exit Button"]

Figure 4-3 Secure Door Control Unit Wiring

Hikvision DS-K1T671TM-3XF - Wire Secure Door Control Unit - 2

Note

  • The secure door control unit should connect to an external power supply separately. The suggested external power supply is 12V, 0.5A.
  • For scenarios with high safety requirement, use the secure door control unit wiring first.
  • You can ask the technical support to purchase for the secure door control unit separately.
  • The picture here are parts of the wiring. For details, see the secure door control unit's user manual.

4.4 Wire Fire Module

4.4.1 Wiring Diagram of Door Open When Powering Off

Lock Type: Anode Lock, Magnetic Lock, and Electric Bolt (NO)

Security Type: Door Open When Powering Off

Scenario: Installed in Fire Engine Access

Type 1

Hikvision DS-K1T671TM-3XF - Type 1 - 1

Note

The fire system controls the power supply of the access control system.

Hikvision DS-K1T671TM-3XF - Note - 1

flowchart
graph TD
    A["Power Input"] --> B["+12V"]
    A --> C["GND"]
    A --> D["A2 Black"]
    A --> E["Group A"]
    F["Alarm Input"] --> G["IN1"]
    F --> H["GND"]
    F --> I["IN2"]
    F --> J["NC"]
    F --> K["COM"]
    F --> L["NO"]
    F --> M["B1 Yellow/Blue"]
    F --> N["B2 Yellow/Black"]
    F --> O["B3 Yellow/Orange"]
    F --> P["B1 Yellow/Purple"]
    F --> Q["B2 Yellow/Brown"]
    F --> R["B3 Yellow/Red"]
    S["RS-485"] --> T["485+"]
    S --> U["485-"]
    S --> V["GND"]
    S --> W["W0"]
    S --> X["W1"]
    S --> Y["WG_OK"]
    S --> Z["WG_ERR"]
    S --> AA["TAMPER"]
    S --> AB["BUZZER"]
    S --> AC["C9 Purple"]
    AD["Wiegand"] --> AE["Group C"]
    AD --> AF["Group D"]
    AG["Door Lock"] --> AH["NC"]
    AG --> AI["COM"]
    AG --> AJ["NO"]
    AG --> AK["SENSOR"]
    AG --> AL["BTN"]
    AG --> AM["D1 White/Purple (NC)"]
    AG --> AN["D2 White/Yellow (COM)"]
    AG --> AO["D3 White/Red (NO)"]
    AG --> AP["D4 Yellow/Green"]
    AG --> AQ["D5 Yellow/Gray"]
    AS["+12 VDC"] --> AT["Fire System"]
    AT --> AU["Eltric Dropbolt"]

Figure 4-4 Wire Device
Hikvision DS-K1T671TM-3XF - Note - 2

flowchart
graph LR
    A["RS-485"] --> B["Face Recognition Terminal"]
    B --> C["Secure Door Control Unit Wiring Terminal"]
    C --> D["Power Input"]
    C --> E["Sensor Input"]
    C --> F["Exit Button"]
    C --> G["Lock Output"]
    D --> H["+12V A1 Red"]
    D --> I["GND A2 Black"]
    E --> J["SENSOR B1 Green/Brown"]
    E --> K["GND B2 Black"]
    F --> L["BUTTON B3 Green/Black"]
    F --> M["GND B4 Black"]
    G --> N["NC C1 White/Purple"]
    G --> O["COM C2 White/Black"]
    G --> P["NO C3 White/Red"]
    H --> Q["+12 VCC"]
    I --> Q
    J --> Q
    K --> Q
    L --> Q
    M --> Q
    N --> Q
    O --> Q
    P --> Q
    Q --> R["Fire System"]

Figure 4-5 Wire Secure Door Control Unit

Type 2

Hikvision DS-K1T671TM-3XF - Type 2 - 1

Note

The fire system (NO and COM, normally open when powering off) is connected with the lock and the power supply in series. When an fire alarm is triggered, the door remains open. In normal times, NO and COM are closed.

Hikvision DS-K1T671TM-3XF - Note - 1

flowchart
graph TD
    A["Power Input"] --> B["+12V GND"]
    B --> C["Group A"]
    D["Alarm Input"] --> E["IN1 GND"]
    E --> F["Group B"]
    G["Alarm Output"] --> H["NC COM NO"]
    H --> I["Group C"]
    J["RS-485"] --> K["485+ 485- GND W0 W1 WG_OK WG_ERR TAMPER BUZZER"]
    K --> L["Group C"]
    M["Door Lock"] --> N["NC COM NO SENSOR BTN"]
    N --> O["Group D"]
    P["+12 VDC Power Supply"] --> Q["Eltric Dropbolt"]
    R["Fire System"] --> S["NC COM NO"]
    T["Face Recognition Terminal"] --> U["Group B"]
    V["Group C"] --> W["Group D"]
    X["Group B"] --> Y["Group C"]
    Z["Group D"] --> AA["Group C"]
    AB["Group A"] --> AC["A1 Red Black"]
    AD["Group B"] --> AE["B1 Yellow/Blue Yellow/Black Yellow/Orange"]
    AF["Group C"] --> AG["C1 Yellow Blue Black Green White White Brown Orange Gray Purple"]
    AH["Group D"] --> AI["D1 White/Purple White/Yellow (NC) (COM)"]
    AJ["Group E"] --> AK["D2 White/Red (NO) Yellow/Green Yellow/Gray"]

Figure 4-6 Wiring Device
Hikvision DS-K1T671TM-3XF - Note - 2

flowchart
graph LR
    A["RS-485"] --> B["Face Recognition Terminal"]
    B --> C["Secure Door Control Unit Wiring Terminal"]
    C --> D["Power Input"]
    C --> E["Sensor Input"]
    C --> F["Exit Button"]
    C --> G["Lock Output"]
    D --> H["+12V GND A1 Red Black"]
    E --> I["SENSOR B1 Green/Brown Black"]
    E --> J["BND B2 Black"]
    F --> K["BUTTON B3 Green/Black Black"]
    G --> L["NC C1 White/Purple (NC)"]
    G --> M["COM C2 White/Black (COM)"]
    G --> N["NO C3 White/Red (NO)"]
    H --> O["Electric Dropbolt"]
    I --> O
    J --> O
    K --> O
    L --> O
    M --> O
    N --> O
    O --> P["Fire System"]

Figure 4-7 Wiring Secure Door Control Unit

4.4.2 Wiring Diagram of Door Locked When Powering Off

Lock Type: Cathode Lock, Electric Lock, and Electric Bolt (NC)

Security Type: Door Locked When Powering Off

Scenario: Installed in Entrance/Exit with Fire Linkage

i Note

  • The Uninterpretable Power Supply (UPS) is required.
  • The fire system (NC and COM, normally closed when powering off) is connected with the lock and the power supply in series. When an fire alarm is triggered, the door remains open. In normal times, NC and COM are open.

Hikvision DS-K1T671TM-3XF - i Note - 1

flowchart
graph TD
    A["Face Recognition Terminal"] --> B["Power Input"]
    A --> C["Alarm Input"]
    A --> D["Alarm Output"]
    A --> E["RS-485"]
    A --> F["Wiegand"]
    A --> G["Door Lock"]

    B --> H["+12V GND Group A"]
    C --> I["IN1 GND Group B"]
    C --> J["NC COM NO Group B"]
    C --> K["485+ 485- GND W0 W1 WG_OK WG_ERR TAMPER BUZZER Group C"]
    C --> L["Group B"]

    I --> M["Red Black"]
    I --> N["Yellow/Blue Yellow/Black Yellow/Orange Yellow/Purple Yellow/Brown Yellow/Red"]
    K --> O["Yellow Blue Black Black Green White Brown Orange Gray Purple"]
    L --> P["White Blue Black Green White Brown Orange Gray Purple"]
    M --> Q["Group C"]

    N --> R["Group D"]

    O --> S["Group D"]

    T["UPS Power Supply"] --> U["+12 VDC Power Supply"]

    V["Electric Strike"] --> W["Fire System"]

    X["NC COM NO Group D"] --> Y["Group D"]

    Z["Group D"] --> AA["Group C"]

    AB["Group D"] --> AC["Group C"]

    AD["Group D"] --> AE["Group C"]

    AF["Group D"] --> AG["Group C"]

    AH["Group D"] --> AI["Group C"]

    AJ["Group D"] --> AK["Group C"]

    AL["Group D"] --> AM["Group C"]

    AN["Group D"] --> AO["Group C"]

    AP["Group D"] --> AQ["Group C"]

    AR["Group D"] --> AS["Group C"]

    AT["Group D"] --> AU["Group C"]

    AV["Group D"] --> AW["Group C"]

    AX["Group D"] --> AY["Group C"]

    AZ["Group D"] --> BA["Group C"]

    BB["Group D"] --> BC["Group C"]

    BD["Group D"] --> BE["Group C"]

    BF["Group D"] --> BG["Group C"]

    BH["Group D"] --> BI["Group C"]

    BJ["Group D"] --> BK["Group C"]

    BL["Group D"] --> BM["Group C"]

    BN["Group D"] --> BO["Group C"]

    BP["Group D"] --> BQ["Group C"]

    BR["Group D"] --> BS["Group C"]

    BT["Group D"] --> BU["Group C"]

    BV["Group D"] --> BW["Group C"]

    BX["Group D"] --> BY["Group C"]

    BZ["Group D"] --> CA["Group C"]

    CB["Group D"] --> CD["Group C"]

    CE["Group D"] --> CF["Group C"]

    CG["Group D"] --> CH["Group C"]

    CI["Group D"] --> CJ["Group C"]

    CK["Group D"] --> CL["Group C"]

    CM["Group D"] --> CN["Group C"]

    CO["Group D"] --> CP["Group C"]

    CS["Group D"] --> CY["Group C"]

    CZ["Group D"] --> CE
    DD["Group D"] --> CF
    DE["Group D"] --> CF

    EF["Group D"] --> GF["Group C"]

    GH["Group D"] --> GH
    ID["Accumulus (NC)"] --> E
    E --> AF
    AF --> BJ
    BJ --> CC
    CC --> DA
    DA --> CX
    CX --> CY
    CY --> AZ
    AZ --> DB
    DB --> DC
    DC --> DV
    DV --> DW
    DW --> BX
    BX --> BX
    BX --> BX
    BX --> BX
    BX --> BX
    BX --> BX
    BX --> BX
    BX --> BX
    BX --> BX
    BX --> BX
    BX --> BX
    BX --> BX
    BX --> BX
    BX --> BX
    BX --> BX
    BX --> BX
    BX --> BX
    BX --> BX
    BX --> BX
    BX --> BX
    BX --> BX
    AX["Accumulus (NC)"] --> Y
    Y --> Z
    Z --> AA
    AA --> AB
    AB --> AC
    AC --> AD
    AD --> AE
    AE --> AF
    AF --> AF
    AF --> AF
    AF --> AF
    AF --> AF
    AF --> AF

    AG["Accumulus (NC)"] --> AH
    AH --> AI
    AI --> AJ
    AJ --> AK
    AK --> AL
    AL --> AM
    AM --> AN
    AN --> AO
    AO --> AP
    AP --> AQ

    AR["Accumulus (NC)"] --> AS
    AS --> AT
    AT --> AU
    AU --> AV
    AV --> AW
    AW --> AX
    AX --> AX

    AXA["Accumulus (NC)"] --> AZA
    AZA --> BA
    BA --> BB
    BB --> BC
    BC --> BD
    BD --> BEA
    BEA --> BFA

    BG["Accumulus (NC)"] --> BH
    BH --> BI
    BI --> BJ
    BJ --> BK
    BK --> BLA

    BA1["Accumulus (NC)"] --> BJ1
    BJ1 --> BK1
    BK1 --> BLA

    BJ1A["Accumulus (NC)"] --> BJ2
    BJ2A --> BK2
    BK2A --> BL2

    BJ2A["Accumulus (NC)"] --> BJ3
    BJ3A --> BK3
    BK3A --> BL3

    BJ3A["Accumulus (NC)"] --> BJ4
    BJ4A --> BK4
    BK4A --> BL4

    BJ4A["Accumulus (NC)"] --> BJ5

    BK5A["Accumulus (NC)"] --> BJ6

    BJ6A["Accumulus (NC)"] --> BJ7

    BK7A["Accumulus (NC)"] --> BJ8

    BJ8A["Accumulus (NC)"] --> BJ9

    BK9A["Accumulus (NC)"] --> BJ10

    BJ10A["Accumulus (NC)"] --> BJ11

    BJ11A["Accumulus (NC)"] --> BJ12

    BJ12A["Accumulus (NC)"] --> BJ13

    BJ13A["Accumulus (NC)"] --> BJ14

    BJ14A["Accumulus (NC)"] --> BJ15

    BJ15A["Accumulus (NC)"] --> BJ16

    BJ16A["Accumulus (NC)"] --> BJ17

    BJ17A["Accumulus (NC)"] --> BJ18

    BJ18A["Accumulus (NC)"] --> BJ19

    BJ19A["Accumulus (NC)"] --> BJ20

    BJ20A["Accumulus (NC)"] --> BJ21

    BJ21A["Accumulus (NC)"] --> BJ22

    BJ22A["Accumulus (NC)"] --> BJ23

    BJ23A["Accumulus (NC)"] --> BJ24

    BJ24A["Accumulus (NC)"] --> BJ25

    BJ25A["Accumulus (NC)"] --> BJ26

    BJ26A["Accumulus (NC)"] --> BJ27

    BJ27A["Accumulus (NC)"] --> BJ28

    BJ28A["Accumulus (NC)"] --> BJ29

    BJ29A["Accumulus (NC)"] --> BJ30

    BJ30A["Accumulus (NC)"] --> BJ31

    BJ31A["Accumulus (NC)"] --> BJ32

    BJ32A["Accumulus (NC)"] --> BJ33

    BJ33A["Accumulus (NC)"] --> BJ34

    BJ34A["Accumulus (NC)"] --> BJ35

    BJ35A["Accumulus (NC)"] --> BJ36

    BJ36A["Accumulus (NC)"] --> BJ37

    BJ37A["Accumulus (NC)"] --> BJ38

    BJ38A["Accumulus (NC)"] --> BJ39

    BJ39A["Accumulus (NC)"] --> BJ40

    BJ40A["Accumulus (NC)"] --> BJ41

    BJ41A["Accumulus (NC)"] --> BJ42

    BJ42A["Accumulus (NC)"] --> BJ43

    BJ43A["Accumulus (NC)"] --> BJ44

    BJ44A["Accumulus (NC)"] --> BJ45

    BJ45A["Accumulus (NC)"] --> BJ46

    BJ46A["Accumulus (NC)"] --> BJ47

    BJ47A["Accumulus (NC)"] --> BJ48

    BJ48A["Accumulus (NC)"] --> BJ49

    BJ49A["Accumulus (NC)"] --> BJ50

    BJ50A["Accumulus (NC)"] --> BJ51

    BJ51A["Accumulus (NC)"] --> BJ52

    BJ52A["Accumulus (NC)"] --> BJ53

    BJ53A["Accumulus (NC)"] --> BJ54

    BJ54A["Accumulus (NC)"] --> BJ55

    BJ55A["Accumulus (NC)"] --> BJ56

    BJ56A["Accumulus (NC)"] --> BJ57

    BJ57A["Accumulus (NC)"] --> BJ58

    BJ58A["Accumulus (NC)"] --> BJ59

    BJ59A["Accumulus (NC)"] --> BJ60

    BKX["Xiaomi"]
</details>

Figure 4-8 Device Wiring   
![](images/3ddbfc63f4506647f3b4b1f5039314af77712ecd038960a011062ca8c116af25.jpg)

<details>
<summary>flowchart</summary>

```mermaid
graph LR
    A["Face Recognition Terminal"] --> B["RS-485"]
    B --> C["485+ B1 Yellow"]
    B --> D["485- B2 Blue"]
    B --> E["GND B3 Black"]
    C --> F["Secure Door Control Unit Wiring Terminal"]
    D --> F
    E --> F
    F --> G["Power Input"]
    F --> H["Sensor Input"]
    F --> I["Exit Button"]
    F --> J["Lock Output"]
    G --> K["+12V GND A1 Red Black"]
    G --> L["+12V GND A2 Black"]
    H --> M["SENSOR B1 Green/Brown Black"]
    H --> N["BUTTON B3 Green/Black Black"]
    I --> O["NC COM C2 White/Purple White/Black"]
    I --> P["NO COM C3 White/Red"]
    J --> Q["+12VDC UPS Power Supply"]
    K --> R["Electric Strike"]
    L --> R
    M --> R
    N --> R
    O --> R
    P --> R
    Q --> S["NC COM NO Fire System"]

Figure 4-9 Wiring Diagram

Chapter 5 Activation

You should activate the device before the first login. After powering on the device, the system will switch to Device Activation page.

Activation via the device, SADP tool and the client software are supported.

The default values of the device are as follows:

• The default IP address: 192.0.0.64
• The default port No.: 8000
• The default user name: admin

5.1 Activate via Device

If the device is not activated, you can activate the device after it is powered on.

On the Activate Device page, create a password and confirm the password. Tap Activate and the device will activated.

Activate Device Enter 8 to 16 characters. Enter Password Confirm Password Confirm Password Enter 8 to 16 characters (Two or more of the following character types are allowed: digit, letter, and symbol.) Activate

Figure 5-1 Activation Page

Hikvision DS-K1T671TM-3XF - Activate via Device - 2

Caution

The password strength of the device can be automatically checked. We highly recommend you change the password of your own choosing (using a minimum of 8 characters, including at least three kinds of following categories: upper case letters, lower case letters, numbers, and special characters) in order to increase the security of your product. And we recommend you change your password regularly, especially in the high security system, changing the password monthly or weekly can better protect your product.

Proper configuration of all passwords and other security settings is the responsibility of the installer and/or end-user.

Hikvision DS-K1T671TM-3XF - Caution - 1

Note

Characters containing admin and nimda are not supported to be set as activation password.

After activation, you should select language, set password change type, set application mode, set network, set platform parameters, set privacy parameters, and set administrator.

5.2 Activate via SADP

SADP is a tool to detect, activate and modify the IP address of the device over the LAN.

Before You Start

  • Get the SADP software from the supplied disk or the official website http://www.hikvision.com/en/, and install the SADP according to the prompts.
  • The device and the PC that runs the SADP tool should be within the same subnet.

The following steps show how to activate a device and modify its IP address. For batch activation and IP addresses modification, refer to User Manual of SADP for details.

Steps

  1. Run the SADP software and search the online devices.
  2. Find and select your device in online device list.
  3. Input new password (admin password) and confirm the password.

Hikvision DS-K1T671TM-3XF - Steps - 1

Caution

STRONG PASSWORD RECOMMENDED-We highly recommend you create a strong password of your own choosing (using a minimum of 8 characters, including upper case letters, lower case letters, numbers, and special characters) in order to increase the security of your product. And we recommend you reset your password regularly, especially in the high security system, resetting the password monthly or weekly can better protect your product.

Hikvision DS-K1T671TM-3XF - Caution - 1

Note

Characters containing admin and nimda are not supported to be set as activation password.

  1. Click Activate to start activation.

SADP Total number of online devices 9 Export Network ✓ Active the Device The device is not activated. 007 Inactive 192.0.0.64 Select inactive device. Input and confirm password.

Status of the device becomes Active after successful activation.

  1. Modify IP address of the device.

1) Select the device.
2) Change the device IP address to the same subnet as your computer by either modifying the IP address manually or checking Enable DHCP.
3) Input the admin password and click Modify to activate your IP address modification.

5.3 Activate Device via Client Software

For some devices, you are required to create the password to activate them before they can be added to the software and work properly.

Steps

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

This function should be supported by the device.

  1. Enter the Device Management page.
  2. Click ▼ on the right of Device Management and select Device.
  3. Click Online Device to show the online device area.
    The searched online devices are displayed in the list.
  4. Check the device status (shown on Security Level column) and select an inactive device.
  5. Click Activate to open the Activation dialog.
  6. Create a password in the password field, and confirm the password.

Hikvision DS-K1T671TM-3XF - Note - 1

Caution

The password strength of the device can be automatically checked. We highly recommend you change the password of your own choosing (using a minimum of 8 characters, including at least three kinds of following categories: upper case letters, lower case letters, numbers, and special characters) in order to increase the security of your product. And we recommend you change your password regularly, especially in the high security system, changing the password monthly or weekly can better protect your product.

Proper configuration of all passwords and other security settings is the responsibility of the installer and/or end-user.

Hikvision DS-K1T671TM-3XF - Caution - 1

Note

Characters containing admin and nimda are not supported to be set as activation password.

  1. Click OK to activate the device.

5.4 Activate via Web Browser

You can activate the device via the web browser.

Steps

  1. Enter the device default IP address (192.0.0.64) in the address bar of the web browser, and press Enter.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

Make sure the device IP address and the computer's should be in the same IP segment.

  1. Create a new password (admin password) and confirm the password.

Hikvision DS-K1T671TM-3XF - Note - 1

Caution

STRONG PASSWORD RECOMMENDED-We highly recommend you create a strong password of your own choosing (using a minimum of 8 characters, including upper case letters, lower case letters, numbers, and special characters) in order to increase the security of your product. And we recommend you reset your password regularly, especially in the high security system, resetting the password monthly or weekly can better protect your product.

Hikvision DS-K1T671TM-3XF - Caution - 1

Note

Characters containing admin and nimda are not supported to be set as activation password.

  1. Click Activate.

  2. Edit the device IP address. You can edit the IP address via the SADP tool, the device, and the client software.

Chapter 6 Quick Operation

6.1 Select Language

You can select a language for the device system.

After the device activation, you can select a language for the device system.

Select Language English Tiếng Việt ภาษาไทย Bahasa Indonesia Next

Figure 6-1 Select System Language

By default, the system language is English.

Hikvision DS-K1T671TM-3XF - Select Language - 2

Note

After you change the system language, the device will reboot automatically.

6.2 Set Password Change Type

After activating the device, you can set the password change type as reserved email address or security questions. Once you forgot the device password, you can change the password via the selected change type.

Change Password via Email Address

If you need to change password via reserved email, you can enter an email address, and tap Next.

Change to Security Question Password Change Type Please set reserved email. Next

Figure 6-2 Password Change Page

Change via Security Questions

If you need to change password via security questions, you can tap Change to Security Questions on the right corner. Select the security questions and enter the answers. Click Next.

Hikvision DS-K1T671TM-3XF - Change via Security Questions - 1

Note

You can only select one type to change password. If you need, you can enter the web page to set both of the changing types.

6.3 Set Application Mode

After activating the device, you should select an application mode for better device application.

Steps

  1. On the Welcome page, select Indoor or Others from the drop-down list.

Select Application Mode Indoor Others Next

Figure 6-3 Welcome Page

  1. Tap OK to save.

Hikvision DS-K1T671TM-3XF - Steps - 2

Note

  • You can also change the settings in System Settings.
  • If you install the device indoors near the window or the face recognition function is not working well, select Others.
  • If you do not configure the application mode and tap Next, the system will select Indoor by default.
  • If you activate the device via other tools remotely, the system will select Indoor as the application mode by default.

6.4 Set Network Parameters

After activation and select application mode, you can set the network for the device

Steps

  1. When you enter the Select Network page, tap Wired Network or Wi-Fi for your actual needs.

Select Network Wired Network Wi-Fi Disconnect the wired netword before connecting a Wi-Fi. Skip Next

Figure 6-4 Select Network

i Note

Disconnect the wired network before connecting a Wi-Fi.

2. Tap Next.

Wired Network

i Note

Make sure the device has connected to a network.

If enable DHCP, the system will assign the IP address and other parameters automatically. If disable DHCP, you should set the IP address, the subnet mask, and the gateway.

i Note

IP address of 192.168.1.64, and 192.168.1.7 are not suggested to use.

Wi-Fi

Select a Wi-Fi and enter the Wi-Fi's password to get connected.

Or tap Add Wi-Fi and enter the Wi-Fi's name and the password to get connected.

3. Optional: Tap Skip to skip network settings.

6.5 Access to Platform

Enable the function and the device can communicate via Hik-Connect. You can add the device to Hik-Connect module client and so on.

Steps

  1. Enable Access to Hik-Connect, and set the server IP and verification code.

Access to Hik-Connect Access to Hik-Connect Previous Next

Figure 6-5 Access to Hik-Connect

  1. Tap Next.
  2. Optional: Tap Skip to skip the step.
  3. Optional: Tap Previous to go to the previous page.

Hikvision DS-K1T671TM-3XF - Steps - 2

Note

If you tap Previous to return to the Wi-Fi configuration page, you need to tap the connected Wi-Fi or connect another Wi-Fi to enter the platform page again.

6.6 Privacy Settings

After activation, selecting application mode, and selecting network, you should set the privacy parameters, including the picture uploading and storage.

Select parameters according to your actual needs.

Privacy Select All ✓ Upload Pic. When Auth. ✓ Save Pic. When Auth. ✓ Save Registered Pic. ✓ Upload Pic. After Linked Captu ✓ Next

Figure 6-6 Privacy

Upload Captured Pic. When Auth. (Upload Captured Picture When Authenticating)

Upload the pictures captured when authenticating to the platform automatically.

Save Captured Pic. When Auth. (Save Captured Picture When Authenticating)

If you enable this function, you can save the picture when Authenticating to the device.

Save Registered Pic. (Save Registered Picture)

The registered face picture will be saved to the system if you enable the function.

Upload Pic. After Linked Capture (Upload Picture After Linked Capture)

Upload the pictures captured by linked camera to the platform automatically.

Save Pic. After Linked Capture (Save Pictures After Linked Capture)

If you enable this function, you can save the picture captured by linked camera to the device.

Tap Next to complete the settings.

6.7 Set Administrator

After device activation, you can add an administrator to manage the device parameters.

Before You Start

Activate the device and select an application mode.

Steps

  1. Optional: Tap Skip to skip adding administrator if required.
  2. Enter the administrator's name (optional) and tap Next.

Add Administrator Employee ID 1 Name Enter Name Skip Next

Figure 6-7 Add Administrator Page

  1. Select a credential to add.

Hikvision DS-K1T671TM-3XF - Steps - 2

Note

Up to one credential should be added.

  • 📷: Face forward at the camera. Make sure the face is in the face recognition area. Click 🔒 to capture and click 🔒 to confirm.
  • : Enter the card No. or present card on the card presenting area. Click OK.

4. Click OK.

You will enter the authentication page.

Status Icon Description

Hikvision DS-K1T671TM-3XF - Status Icon Description - 1

Device is armed/not armed.

Hikvision DS-K1T671TM-3XF - Status Icon Description - 2

Hik-Connect is enabled/disabled.

Hikvision DS-K1T671TM-3XF - Status Icon Description - 3

The device wired network is connected/not connected/connecting failed.

Shortcut Keys Description

Hikvision DS-K1T671TM-3XF - Shortcut Keys Description - 1

You can configure those shortcut keys displayed on the screen. For details, see Basic Settings.

Hikvision DS-K1T671TM-3XF - Shortcut Keys Description - 2

Scan QR code to authenticate.

Hikvision DS-K1T671TM-3XF - Shortcut Keys Description - 3

The QR code can be obtained from the visitor terminal.

Hikvision DS-K1T671TM-3XF - Shortcut Keys Description - 4

  • Enter the device room No. and tap OK to call.
  • Tap to call the center.

Hikvision DS-K1T671TM-3XF - Shortcut Keys Description - 5

The device should be added to the center, or the calling operation will be failed.

Hikvision DS-K1T671TM-3XF - Shortcut Keys Description - 6

Enter password to authenticate.

Chapter 7 Basic Operation

7.1 Login

Login the device to set the device basic parameters.

7.1.1 Login by Administrator

If you have added an administrator for the device, only the administrator can login the device for device operation.

Steps

  1. Long tap on the initial page for 3 s and slide to the left/right by following the gesture to enter the admin login page.

12-15 Wed. 13:58 Authenticate via Face

Figure 7-1 Admin Login

  1. Authenticate the administrator's face or card to enter the home page.

Menu User ACS T & A Comm. Basic Biometrics Data Maint. Temperature Preference

Figure 7-2 Home Page

Hikvision DS-K1T671TM-3XF - Steps - 3

Note

The device will be locked for 30 minutes after 5 failed attempts.

  1. Optional: Tap 6 and you can enter the device activation password for login.
  2. Optional: Tap and you can exit the admin login page.

7.1.2 Login by Activation Password

You should login the system before other device operations. If you do not configure an administrator, you should follow the instructions below to login.

Steps

  1. Long tap on the initial page for 3 s and slide to the left/right by following the gesture to enter password entering page.
  2. Tap the Passwordfield and enter the device activation password.

  3. Tap OK to enter the home page.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

The device will be locked for 30 minutes after 5 failed password attempts.

Menu User ACS T & A Comm. Basic Biometrics Data Maint. Temperature Preference

Figure 7-3 Home Page

7.1.3 Forgot Password

If you forget the password during authentication, you can change the password.

Steps

  1. Hold the initial page for 3 s and slide to the left/right by following the gesture and log in the page.
  2. Optional: If you have set an administrator, tap in the pop-up admin authentication page.

Enter Password Enter Password Forgot Password Enter 8 to 16 characters (Two or more of the following character types are allowed: digit, letter, and symbol.) OK

Figure 7-4 Password Authentication Page

3. Tap Forgot Password.

  1. Select a password change type from the list.

Hikvision DS-K1T671TM-3XF - Tap Forgot Password. - 1

Note

If you have only set 1 password change type, you will go to the corresponded password change page for further settings.

  1. Answer the security questions or change the password according to email address.

  2. Security Questions: Answer the security questions that configured when activation.

  3. Email Address

Hikvision DS-K1T671TM-3XF - Note - 1

Note

Make sure the device has added to the Hik-Connect account.

a. Download Hik-Connect app.
b. Go to More → Reset Device Password.

c. Scan the QR code on the device and a verification code will be popped up.

Hikvision DS-K1T671TM-3XF - Note - 1

Tap the QR code to get a larger picture.

d. Enter the verification code on the device page.

  1. Create a new password and confirm it.
  2. Tap OK.

7.2 Communication Settings

You can set the network parameters, the RS-485 parameters, and the Wiegand parameters on the communication settings page.

7.2.1 Set Wired Network Parameters

You can set the device wired network parameters, including the IP address, the subnet mask, the gateway, and DNS parameters.

Steps

  1. Tap Comm. (Communication Settings) on the Home page to enter the Communication Settings page.
  2. On the Communication Settings page, tap Wired Network.

Wired Network DHCP IP Address 10.7 113.42 > Subnet Mask 256.255.255.0 > Gateway 10.7 113.254 > Auto Obtain DNS Preferred DNS Server 8.8.8.8 > Alternate DNS Server 8.8.4.4 >

Figure 7-5 Wired Network Settings

  1. Set IP Address, Subnet Mask, and Gateway.

- Enable DHCP, and the system will assign IP address, subnet mask, and gatewayautomatically.

- Disable DHCP, and you should set the IP address, subnet mask, and gateway manually.

i Note

  • The device's IP address and the computer IP address should be in the same IP segment.
  • IP address of 192.168.1.64, and 192.168.1.7 are not suggested to use.

  • Set the DNS parameters. You can enable Auto Obtain DNS, set the preferred DNS server and the alternate DNS server.

7.2.2 Set Wi-Fi Parameters

You can enable the Wi-Fi function and set the Wi-Fi related parameters.

Steps

i Note

The function should be supported by the device.

  1. Tap Comm. (Communication Settings) on the Home page to enter the Communication Settings page.
  2. On the Communication Settings page, tap.

Wi-Fi Enable Wi-Fi Select Network USB OFF 8 TP-LIME_7011 8 TP-LIME_2363 8 TP-LIME_FAM6 8 TP-LIME_ADD3 8 USB 5 8 ACI_TEST 8 TP-LIME_2999 8 Add Wi-Fi

Figure 7-6 Wi-Fi Settings

  1. Enable the Wi-Fi function.
  2. Configure the Wi-Fi parameters.

  3. Select a Wi-Fi from the list, and enter the Wi-Fi's password. Tap OK.

  4. If the target Wi-Fi is not in the list, tap Add Wi-Fi. Enter the Wi-Fi's name and password. And tap OK.

Hikvision DS-K1T671TM-3XF - i Note - 2

Note

Only digits, letters, and special characters are allowed in the password.

  1. Set the Wi-Fi's parameters.

  2. By default, DHCP is enable. The system will allocate the IP address, the subnet mask, and the gateway automatically.

  3. If disable DHCP, you should enter the IP address, the subnet mask, and the gateway manually.

  4. Tap OK to save the settings and go back to the Wi-Fi tab.

  5. Tap √ to save the network parameters.

7.2.3 Set RS-485 Parameters

The face recognition terminal can connect external access controller, secure door control unit or card reader via the RS-485 terminal.

Steps

  1. Tap Comm. (Communication Settings) on the Home page to enter the Communication Settings page.
  2. On the Communication Settings page, tap RS-485 to enter the RS-485 tab.

RS-485 Peripheral Card Reader > Access Controller Control Unit Card Reader ✓

Figure 7-7 Set RS-485 Parameters

  1. Select an peripheral type according to your actual needs.

Hikvision DS-K1T671TM-3XF - Steps - 2

Note

If you select Access Controller: If connect the device to a terminal via the RS-485 interface, set the RS-485 address as 2. If you connect the device to a controller, set the RS-485 address according to the door No.

  1. Tap the back icon at the upper left corner and you should reboot the device if you change the parameters.

7.2.4 Set Wiegand Parameters

You can set the Wiegand transmission direction.

Steps

  1. Tap Comm. (Communication Settings) on the Home page to enter the Communication Settings page.
  2. On the Communication Settings page, tap Wiegand to enter the Wiegand tab.

Wiegand Wiegand Settings Direction Output > Mode Wiegand 26 > Wiegand 26 Wiegand 34

Figure 7-8 Wiegand Settings

  1. Enable the Wiegand function.
  2. Select a transmission direction.

  3. Output: A face recognition terminal can connect an external access controller. And the two devices will transmit the card No. via Wiegand 26 or Wiegand 34.

  4. Input: A face recognition terminal can connect a Wiegand card reader.

  5. Tap to save the network parameters.

Hikvision DS-K1T671TM-3XF - Steps - 2

Note

If you change the external device, and after you save the device parameters, the device will reboot automatically.

7.2.5 Set ISUP Parameters

Set ISUP parameters and the device can upload data via ISUP protocol.

Before You Start

Make sure your device has connect to a network.

Steps

  1. Tap Comm. → ISUP.

ISUP Protocol Version 5.0 > Central Group Main Channel None > ISUP Address Type IP > IP 0.0.0.0 > Port 0 > Device ID > ISUP Key >

Figure 7-9 ISUP Settings

  1. Enable the ISUP function and set the ISUP server parameters.

ISUP Version

Set the ISUP version according to your actual needs.

Central Group

Enable central group and the data will be uploaded to the center group.

Main Channel

Support N1 or None.

ISUP

Enable ISUP function and the data will be uploaded via ISUP protocol.

Address Type

Select an address type according to your actual needs.

IP Address

Set the ISUP server's IP address.

Port No.

Set the ISUP server's port No.

Hikvision DS-K1T671TM-3XF - Steps - 2

Port No. Range: 0 to 65535.

Device ID

Set device serial no.

ISUP Key

If you choose V5.0, you should create an account and ISUP key. If you choose other version, you should create an ISUP account only.

Hikvision DS-K1T671TM-3XF - ISUP Key - 1

  • Remember the ISUP account and ISUP key. You should enter the account name or the key when the device should communicate with other platforms via ISUP protocol.
    • ISUP key range: 8 to 32 characters.

7.2.6 Platform Access

You can change the device verification code and set the server address before you add the device to the Hik-Connect mobile client.

Before You Start

Make sure your device has connected to a network.

Steps

  1. Tap Comm. (Communication Settings) on the Home page to enter the Communication Settings page.
  2. On the Communication Settings page, tap Access to Hik-Connect.
  3. Enable Access to Hik-Connect
  4. Enter Server IP.
  5. Create the Verification Code, and you need to enter the verification code when you manage the devices via Hik-Connect.

7.3 User Management

On the user management interface, you can add, edit, delete and search the user.

7.3.1 Add Administrator

The administrator can login the device backend and configure the device parameters.

Steps

  1. Long tap on the initial page and log in the backend.
  2. Tap User → + to enter the Add User page.

  3. Edit the employee ID.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

  • The employee ID should be less than 32 characters. And it can be a combination of lower letters, upper letters, and numbers.
  • The employee ID should not be duplicated.

  • Tap the Name field and input the user name on the soft keyboard.

Hikvision DS-K1T671TM-3XF - Note - 1

Note

  • Numbers, upper case letters, lower case letters, and special characters are allowed in the user name.
  • Up to 32 characters are allowed in the user name.

  • Optional: Add a face picture, or cards for the administrator.

Hikvision DS-K1T671TM-3XF - Note - 1

Note

  • For details about adding a face picture, see Add Face Picture.
  • For details about adding a card, see Add Card.

  • Optional: Set the administrator's authentication type.

Hikvision DS-K1T671TM-3XF - Note - 1

Note

For details about setting the authentication type, see Set Authentication Mode.

  1. Enable the Administrator Permission function.

Enable Administrator Permission

The user is the administrator. Except for the normal attendance function, the user can also enter the Home page to operate after authenticating the permission.

  1. Tap to save the settings.

7.3.2 Add Face Picture

Add user's face picture to the device. And the user can use the face picture to authenticate.

Steps

  1. Long tap on the initial page for 3 s and slide to the left/right by following the gesture and log in the backend.
  2. Tap User → + to enter the Add User page.
  3. Edit the employee ID.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

  • The employee ID should be less than 32 characters. And it can be a combination of lower letters, upper letters, and numbers.
  • The employee ID should not be duplicated.

  • Tap the Name field and input the user name on the soft keyboard.

Hikvision DS-K1T671TM-3XF - Note - 1

Note

  • Numbers, upper case letters, lower case letters, and special characters are allowed in the user name.
    • The suggested user name should be within 32 characters.

  • Tap the Face Picture field to enter the face picture adding page.

Tap Capture Button to Take Photo

Figure 7-10 Add Face Picture

  1. Look at the camera.

Hikvision DS-K1T671TM-3XF - Note - 2

Note

• Make sure your face picture is in the face picture outline when adding the face picture.
• Make sure the captured face picture is in good quality and is accurate.
- For details about the instructions of adding face pictures, see Tips When Collecting/Comparing Face Picture.

After completely adding the face picture, a captured face picture will be displayed at the upper right corner of the page.

  1. Tap Save to save the face picture.
  2. Optional: Tap Try Again and adjust your face position to add the face picture again.
  3. Set the user role.

Administrator

The user is the administrator. Except for the normal attendance function, the user can also enter the Home page to operate after authenticating the permission.

Normal User

The User is the normal user. The user can only authenticate or take attendance on the initial page.

  1. Tap to save the settings.

7.3.3 Add Card

Add a card for the user and the user can authenticate via the added card.

Steps

  1. Long tap on the initial page for 3 s and slide to the left/right by following the gesture and log in the backend.
  2. Tap User → + to enter the Add User page.
  3. Connect an external card reader according to the wiring diagram.
  4. Tap the Employee ID. field and edit the employee ID.

i Note

  • The employee ID should be less than 32 characters. And it can be a combination of lower letters, upper letters, and numbers.
  • The employee ID should not be duplicated.

  • Tap the Name field and input the user name on the soft keyboard.

i Note

  • Numbers, upper case letters, lower case letters, and special characters are allowed in the user name.
  • The suggested user name should be within 32 characters.

  • Tap the Card field and tap +.

  • Configure the card No.

- Enter the card No. manually.

- Present the card over the card presenting area to get the card No.

Hikvision DS-K1T671TM-3XF - i Note - 1

Note

• The card No. cannot be empty.
- Up to 20 characters are allowed in the card No.
• The card No. cannot be duplicated.

  1. Configure the card type.

  2. Set the user role.

Administrator

The user is the administrator. Except for the normal attendance function, the user can also enter the Home page to operate after authenticating the permission.

Normal User

The User is the normal user. The user can only authenticate or take attendance on the initial page.

  1. Tap to save the settings.

7.3.4 View Password

Add a password for the user and the user can authenticate via the password.

Steps

  1. Long tap on the initial page for 3 s and slide to the left/right by following the gesture and log in the backend.
  2. Tap User → + to enter the Add User page.
  3. Tap the Employee ID. field and edit the employee ID.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

  • The employee ID should be less than 32 characters. And it can be a combination of lower letters, upper letters, and numbers.
  • The employee ID should not be duplicated.

  • Tap the Name field and input the user name on the soft keyboard.

Hikvision DS-K1T671TM-3XF - Note - 1

Note

  • Numbers, upper case letters, lower case letters, and special characters are allowed in the user name.
  • The suggested user name should be within 32 characters.

  • Tap the Password to view the password.

Hikvision DS-K1T671TM-3XF - Note - 1

Note

The password cannot be edited. It can only be applied by the platform.

  1. Set the user role.

Administrator

The user is the administrator. Except for the normal attendance function, the user can also enter the Home page to operate after authenticating the permission.

Normal User

The User is the normal user. The user can only authenticate or take attendance on the initial page.

  1. Tap to save the settings.

7.3.5 Set Authentication Mode

After adding the user's face picture, password, or other credentials, you should set the authentication mode and the user can authenticate his/her identity via the configured authentication mode.

Steps

  1. Long tap on the initial page for 3 s and slide to the left/right by following the gesture and log in the backend.
  2. Tap User → Add User/Edit User → Authentication Mode.
  3. Select Device or Custom as the authentication mode.

Device

If you want to select device mode, you should set the terminal authentication mode in Access Control Settings page first. For details see Setting Access Control Parameters.

Custom

You can combine different authentication modes together according to your actual needs.

  1. Tap to save the settings.

7.3.6 Search and Edit User

After adding the user, you can search the user and edit it.

Search User

On the User Management page, Tap the search area to enter the Search User page. Tap Card on the left of the page and select a search type from the drop-down list. Enter the employee ID, card No., or the user name for search. Tap to search.

Edit User

On the User Management page, select a user from the user list to enter the Edit User page. Follow the steps in User Management to edit the user parameters. Tap √ to save the settings.

Hikvision DS-K1T671TM-3XF - Edit User - 1

Note

The employee ID cannot be edited.

7.4 Data Management

You can delete data, import data, and export data.

7.4.1 Delete Data

Delete user data.

On the Home page, tap Data → Delete Data → User Data. All user data added in the device will be deleted.

7.4.2 Import Data

Steps

  1. Plug a USB flash drive in the device.
  2. On the Home page, tap Data → Import Data.
  3. Tap User Data or Face Data.
  4. Enter the created password when you exported the data. If you do not create a password when you exported the data, leave a blank in the input box and tap OK immediately.

i Note

  • If you want to transfer all user information from one device (Device A) to another (Device B), you should export the information from Device A to the USB flash drive and then import from the USB flash drive to Device B. In this case, you should import the user data before importing the profile photo.
  • The supported USB flash drive format is FAT32.
  • The imported pictures should be saved in the folder (named enroll_pic) of the root directory and the picture's name should be follow the rule below:
    Card No._Name_Department_Employee ID_Gender.jpg
  • If the folder enroll_pic cannot save all imported pictures, you can create another folders, named enroll_pic1, enroll_pic2, enroll_pic3, enroll_pic4, under the root directory.
  • The employee ID should be less than 32 characters. It can be a combination of lower letters, upper letters, and numbers. It should not be duplicated, and should not start with 0.
  • Requirements of face picture should follow the rules below: It should be taken in full-face view, directly facing the camera. Do not wear a hat or head covering when taking the face picture. The format should be JPEG or JPG. The resolution should be 640 × 480 pixel or more than of 640 × 480 pixel. The picture size should be between 60 KB and 200 KB.

7.4.3 Export Data

Steps

  1. Plug a USB flash drive in the device.

  2. On the Home page, tap Data → Export Data.

  3. Tap Event Data, User Data, or Face Data.
  4. Optional: Create a password for exporting. When you import those data to another device, you should enter the password.

i Note

  • The supported USB flash drive format is DB.
  • The system supports the USB flash drive with the storage of 1G to 32G. Make sure the free space of the USB flash drive is more than 512M.
  • The exported user data is a DB file, which cannot be edited.

7.5 Identity Authentication

After network configuration, system parameters configuration and user configuration, you can go back to the initial page for identity authentication. The system will authenticate person according to the configured authentication mode.

You can authenticate identity via 1:1 matching or 1:N matching.

1:N Matching

Compare the captured face picture with all face pictures stored in the device.

1: 1 Matching

Compare the captured face picture with all face pictures stored in the device.

7.5.1 Authenticate via Single Credential

Set the user authentication type before authentication. For details, see Set Authentication Mode. Authenticate face, card or QR code.

Face

Face forward at the camera and start authentication via face.

Card

Present the card on the card presenting area and start authentication via card.

i Note

The card can be normal IC card, or encrypted card.

QR Code

Put the QR code in front of the device camera to authenticate via QR code.

i Note

Authentication via QR code should be supported by the device.

If authentication completed, a prompt "Authenticated" will pop up.

7.5.2 Authenticate via Multiple Credential

Before You Start

Set the user authentication type before authentication. For details, see Set Authentication Mode.

Steps

  1. If the authentication mode is Card and Face, Password and Face, Card and Password, authenticate any credential according to the instructions on the live view page.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

  • The card can be normal IC card, or encrypted card.
  • If the QR Code Scanning function is enabled, you can put the QR code in front of the device camera to authenticate via QR code.

  • After the previous credential is authenticated, continue authenticate other credentials.

Hikvision DS-K1T671TM-3XF - Note - 1

Note

For detailed information about authenticating face, see Tips When Collecting/Comparing Face Picture.

If authentication succeeded, the prompt "Authenticated" will pop up.

7.6 Basic Settings

You can set the voice, time, sleeping (s), language, community No., building No., and Unit No.

Long tap on the initial page for 3 s and slide to the left/right by following the gesture and login the device home page. Tap Basic.

Basic Settings Voice Settings > Time Settings > Sleeping (s) 60 > Select Language English > Supplement Light Settings > Community No. 1 > Building No. 1 > Unit No. 1 > Beauty Disable >

Figure 7-11 Basic Settings Page

Voice Settings

You can enable/disable the voice prompt function and adjust the voice volume.

Hikvision DS-K1T671TM-3XF - Voice Settings - 1

Note

You can set the voice volume between 0 and 10.

Time Settings

Set the time zone, the device time and the DST.

Sleeping (s)

Set the device sleeping waiting time (s). For example, when you are on the initial page and if you set the sleeping time to 30 s, the device will sleep after 30 s without any operation.

Hikvision DS-K1T671TM-3XF - Sleeping (s) - 1

Note

20 s to 999 s are available to configure.

Select Language

Select the language according to actual needs.

Community No.

Set the device installed community No.

Building No.

Set the device installed building No.

Unit No.

Set the device installed unit No.

7.7 Set Biometric Parameters

You can customize the face parameters to improve the face recognition performance. The configurable parameters includes application mode, face liveness level, face recognition distance, face recognition interval, wide dynamic, face 1:N security level, face 1:1 security level, ECO settings, face with mask detection and hard hat detection.

Long tap on the initial page for 3 s and login the home page. Tap Biometric.

Table 7-1 Face Picture Parameters

Parameter Description
Application Mode Selecteither others or indoor according to actual environment.
Face Liveness LevelAfter enabling face anti-spoofing function, you can set the matching security level when performing live face authentication.
Face Recognition DistanceSet the valid distance between the user and the camera when authenticating.
Face Recognition IntervalThe time interval between two continuous face recognitions when authenticating.Hikvision DS-K1T671TM-3XF - Set Biometric Parameters - 1 NoteYou can input the number from 1 to 10.
Wide Dynamic It is suggested to enable the WDR function if installing the device outdoors.When there are both very bright and very dark areas simultaneously in the view, you can enable the WDR function to balance the brightness of the whole image and provide clear images with details.
Face 1:N Security LevelSet the matching threshold when authenticating via 1:N matching mode. The larger the value, the smaller the false accept rate and the larger the false rejection rate.
Face 1:1 Security LevelSet the matching threshold when authenticating via 1:1 matching mode. The larger the value, the smaller the false accept rate and the larger the false rejection rate.
ECO SettingsAfter enablingThe ECO mode, the device will use the IR camera to authenticate faces in the low light or dark environment. And you can set the ECO mode threshold, ECO mode (1:N), and ECO mode (1:1).ECO Mode ThresholdWhen enabling the ECO mode, you can set the ECO mode's threshold. The larger the value, the easier the device entering the ECO mode.ECO Mode (1:1)Set the matching threshold when authenticating via ECO mode 1:1 matching mode. The larger the value, the smaller the false accept rate and the larger the false rejection rate.ECO Mode (1:N)Set the matching threshold when authenticating via ECO mode 1:N matching mode. The larger the value, the smaller the false accept rate and the larger the false rejection rateFace with Mask & Face(1:N ECO)Set the matching value when authenticating with face mask via ECO mode 1:N matching mode. The larger the value, the smaller the false accept rate and the larger the false rejection rate.
Face with Mask DetectionAfter enabling the face with mask detection, the system will recognize the captured face with mask picture. You can set face with mask & face 1:N level and the strategy.Reminder of WearingIf the person do not wear a face mask when authenticating, the device prompts a notification and the door will open.Must WearIf the person do not wear a face mask when authenticating, the device prompts a notification and the door keeps closed.NoneIf the person do not wear a face mask when authenticating, the device will not prompt a notification.
Hard Hat DetectionAfter enabling the hard hat detection, you can set the strategy.Reminder of WearingIf the person do not wear the hard hat when authenticating, the device will pop up a prompt and the door will open.Must WearIf the person do not wear the hard hat when authenticating, the device will pop up a prompt and the door will keep closed.NoneIf the person do not wear a face mask when authenticating, the device will not prompt a notification.

7.8 Set Access Control Parameters

You can set the access control permissions, including the functions of authentication mode, enable NFC card, door contact, and door open time.

On the Home page, tap ACS (Access Control Settings) to enter the Access Control Settings page. Edit the access control parameters on this page.

Access Control Settings Terminal Auth. Mode > Reader Auth. Mode > Enable NFC Card Door Contact Remain Closed > Open Duration (s) 5 > Authentication Interval (s) 0 >

Figure 7-12 Access Control Parameters

The available parameters descriptions are as follows:

Table 7-2 Access Control Parameters Descriptions

Parameter Description
Terminal Auth. Mode (Terminal Authentication Mode)Select the face recognition terminal's authentication mode. You can also customize the authentication mode.NoteBiometric recognition products are not completely applicable to anti-spoofing environments. If you require a higher security level, use multiple authentication modes.If you adopt multiple authentication modes, you should authenticate other methods before authenticating face.
Reader Auth. Mode (Card Reader Authentication Mode)Select the card reader's authentication mode.
Enable NFC Card Enable the function and you can present the NFC card to authenticate.
Door Contact You can select "Open (Remain Open)" or "Close (Remian Closed)" according to your actual needs. By default, it is Close (Remian Closed).
Open DurationSet the door unlocking duration. If the door is not opened for the set time, the door will be locked. Available door locked time range: 1 to 255s.
Authentication IntervalSet the device authenticating interval. Available authentication interval range: 0 to 65535.

7.9 Time and Attendance Status Settings

You can set the attendance mode as check in, check out, break out, break in, overtime in, and overtime out according to your actual situation.

i Note

The function should be used cooperatively with time and attendance function on the client software.

7.9.1 Disable Attendance Mode via Device

Disable the attendance mode and the system will not display the attendance status on the initial page.

Tap T&A Status to enter the T&A Status page.

T & A Status Attendance Mode Disable >

Figure 7-13 Disable Attendance Mode

Set the Attendance Mode as Disable.

You will not view or configure the attendance status on the initial page. And the system will follow the attendance rule that configured on the platform.

7.9.2 Set Manual Attendance via Device

Set the attendance mode as manual, and you should select a status manually when you take attendance.

Before You Start

Add at least one user, and set the user's authentication mode. For details, see User Management.

Steps

  1. Tap T&A Status to enter the T&A Status page.
  2. Set the Attendance Mode as Manual.

T & A Status Attendance Mode Manual > Attendance Status Required check in Disable > check out break out Disable > break in overtime in Disable > overtime out

Figure 7-14 Manual Attendance Mode

  1. Enable the Attendance Status Required.
  2. Enable a group of attendance status.

Hikvision DS-K1T671TM-3XF - Steps - 2

Note

The Attendance Property will not be changed.

  1. Optional: Select an status and change its name if required.

The name will be displayed on the T & A Status page and the authentication result page.

Result

You should select an attendance status manually after authentication.

Hikvision DS-K1T671TM-3XF - Result - 1

Note

If you do not select a status, the authentication will be failed and it will not be marked as a valid attendance.

7.9.3 Set Auto Attendance via Device

Set the attendance mode as auto, and you can set the attendance status and its available schedule. The system will automatically change the attendance status according to the configured schedule.

Before You Start

Add at least one user, and set the user's authentication mode. For details, see User Management.

Steps

  1. Tap T&A Status to enter the T&A Status page.
  2. Set the Attendance Mode as Auto.

T & A Status Attendance Mode Auto > Attendance Status Required check in Disable > check out break out Disable > break in overtime in Disable > overtime out

Figure 7-15 Auto Attendance Mode

  1. Enable the Attendance Status function.

  2. Enable a group of attendance status.

Hikvision DS-K1T671TM-3XF - Steps - 2

Note

The Attendance Property will not be changed.

  1. Optional: Select an status and change its name if required.

The name will be displayed on the T & A Status page and the authentication result page.

  1. Set the status' schedule.

1) TapAttendance Schedule.
2) Select Monday, Tuesday, Wednesday, Thursday, Friday, Saturday, or Sunday.
3) Set the selected attendance status's start time of the day.
4) TapConfirm.
5) Repeat step 1 to 4 according to your actual needs.

Hikvision DS-K1T671TM-3XF - Note - 1

Note

The attendance status will be valid within the configured schedule.

Result

When you authenticate on the initial page, the authentication will be marked as the configured attendance status according to the configured schedule.

Example

If set the Break Out as Monday 11:00, and Break In as Monday 12:00, the valid user's authentication from Monday 11:00 to 12:00 will be marked as break.

7.9.4 Set Manual and Auto Attendance via Device

Set the attendance mode as Manual and Auto, and the system will automatically change the attendance status according to the configured schedule. At the same time you can manually change the attendance status after the authentication.

Before You Start

Add at least one user, and set the user's authentication mode. For details, see User Management.

Steps

  1. Tap T&A Status to enter the T&A Status page.
  2. Set the Attendance Mode as Manual and Auto.

T & A Status Attendance Mode Manual and Auto > Attendance Status Required check in Disable > check out break out Disable > break in overtime in Disable > overtime out

Figure 7-16 Manual and Auto Mode

  1. Enable the Attendance Status function.
  2. Enable a group of attendance status.

Hikvision DS-K1T671TM-3XF - Steps - 2

The Attendance Property will not be changed.

  1. Optional: Select an status and change its name if required.

The name will be displayed on the T & A Status page and the authentication result page.

  1. Set the status' schedule.

1) Tap Attendance Schedule.
2) Select Monday, Tuesday, Wednesday, Thursday, Friday, Saturday, or Sunday.
3) Set the selected attendance status's start time of the day.
4) Tap OK.
5) Repeat step 1 to 4 according to your actual needs.

Hikvision DS-K1T671TM-3XF - Steps - 3

The attendance status will be valid within the configured schedule.

Result

On the initial page and authenticate. The authentication will be marked as the configured attendance status according to the schedule. If you tap the edit icon on the result tab, you can select a status to take attendance manually, the authentication will be marked as the edited attendance status.

Example

If set the Break Out as Monday 11:00, and Break In as Monday 12:00, the valid user's authentication from Monday 11:00 to 12:00 will be marked as break.

7.10 System Maintenance

You can view the system information and the capacity. You can also upgrade the device, restore to factory settings, restore to default settings, and reboot the device.

Long tap on the initial page for 3 s and slide to the left/right by following the gesture and login the home page. Tap Maint.

Hold the ? on the upper-right corner of the page and enter the password to view the version of the device.

System Maintenance System Information > Capacity > Device Upgrade > Unlink APP Account Restore to Factory Settings Restore to Default Settings Reboot

System Information

You can view the device model, serial No., versions, address, production data, QR code, and open source code license.

Hikvision DS-K1T671TM-3XF - System Information - 1

Note

The page may vary according to different device models. Refers to the actual page for details.

Capacity

You can view the number of, user, face picture, card, and event.

Device Upgrade

Online Update

If the device has been connected to Hik-Connect and network, when there is a new installation package in Hik-Connect, you can tap Device Upgrade → Online Update to upgrade the device system.

Update via USB

Plug the USB flash drive in the device USB interface. Tap Device Upgrade → Update via USB, and the device will read the digicap.dav file in the USB flash drive to start upgrading.

After unlinking APP account, you cannot operate via APP.

Restore to Default Settings

All parameters, except for the communication settings, remotely imported user information, will be restored to the default settings. The system will reboot to take effect.

Restore to Factory Settings

All parameters will be restored to the factory settings. The system will reboot to take effect.

Reboot

Reboot the device.

7.11 Preference Settings

You can configure preference settings parameters.

Steps

  1. Tap Basic Settings → Preference to enter the preference settings page.

Preference Shortcut Key > Theme Default >

Figure 7-17 Preference Settings

Shortcut Key

Choose the shortcut key that displayed on the authentication page, including the call function, call type, and the password entering function.

Hikvision DS-K1T671TM-3XF - Shortcut Key - 1

You can select call type from Call Room, Call Center, Call Specified Room No. and Call APP. Call Room

When you tap the call button on the authentication page, you should dial a room No. to call.

Call Center

When you tap the call button on the authentication page, you can call the center directly.

Call Specified Room No.

You should set a room No. When you tap the call button on the authentication page, you can call the configured room directly without dialing.

Call APP

When you tap the call button on the authentication page, you will call the mobile client where the device is added.

Password

Enable this function and you can enter the password to authenticate via password.

Theme

You can set the theme of the prompt window on the authentication page. You can select Theme as Default, Simple, or Advertisement.

Default

The device authentication page will display the live view page. And the person's name, employee ID, face pictures will all be displayed after authentication.

Simple

After selecting this mode, the live view of the authentication page will be disabled, and in the meanwhile, the person's name, employee ID, face pictures will all be hidden after authentication.

After selecting this mode, the advertising area and identification authentication area of the device will be displayed on separate screens. Video and advertising information playback, welcome speech display are supported.

7.12 Video Intercom

After adding the device to the client software, you can call the device from the client software, call the main station from the device, call the client software from the device, call the indoor station from the device, or call the specific room from the device.

7.12.1 Call Client Software from Device

Steps

  1. Get the client software from the supplied disk or the official website, and install the software according to the prompts.
  2. Run the client software and the control panel of the software pops up.
  3. Click Device Management to enter the Device Management interface.
  4. Add the device to the client software.

i Note

For details about adding device, see Add Device.

  1. Call the client software.

1) Tap on the device initial page.
2) Enter 0 in the pop-up window.
3) Tap to call the client software.

  1. Tap Answer on the pop-up page of the client software and you can start two-way audio between the device and the client software.

i Note

If the device is added to multiple client softwares and when the device is calling the client software, only the first client software added the device will pop up the call receiving window.

7.12.2 Call Center from Device

Steps

  1. Get the client software from the supplied disk or the official website, and install the software according to the prompts.
  2. Run the client software and the control panel of the software pops up.
  3. Click Device Management to enter the Device Management interface.
  4. Add the main station and the device to the client software.

i Note

For details about adding device, see Add Device.

  1. Set the main station's IP address and SIP address in the remote configuration page.

i Note

For details about the operation, see the user manual of the main station.

  1. Call the center.

  2. If you have configured to call center in the Basic Settings, you can tap to call the center.

  3. If you have not configured to call center in the Basic Settings, you should tap → to call the center

  4. Answers the call via the main station and starts two-way audio.

i Note

The device will call the main station in priority.

7.12.3 Call Device from Client Software

Steps

  1. Get the client software from the supplied disk or the official website, and install the software according to the prompts.
  2. Run the client software and the control panel of the software pops up.
  3. Click Device Management to enter the Device Management page.
  4. Add the device to the client software.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

For details about adding device, see Add Device.

  1. Enter the Live View page and double-click the added device to start live view.

Hikvision DS-K1T671TM-3XF - Note - 1

Note

For details about operations in the Live View page, see Live View in the user manual of the client software.

  1. Right click the live view image to open the right-click menu.
  2. Click Start Two-Way Audio to start two-way audio between the device and the client software.

7.12.4 Call Room from Device

Steps

  1. Get the client software from the supplied disk or the official website, and install the software according to the prompts.
  2. Run the client software and the control panel of the software pops up.
  3. Click Device Management to enter the Device Management interface.
  4. Add the indoor station and the device to the client software.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

For details about adding device, see Add Device.

  1. Link a user to an indoor station and set a room No. for the indoor station.
  2. Call the room.

- If you have configured a specified room No. in the Basic Settings, you can tap to call the room.

- If you have not configured a specified room No. in the Basic Settings, you should tap ☐ on the authentication page of the device. Enter the room No. on the dial page and tap ☐ to call the room.

  1. After the indoor station answers the call, you can start two-way audio with the indoor station.

7.12.5 Call Mobile Client from Device

Steps

  1. Get the mobile mobile client from the supplied disk or the official website, and install the software according to the prompts.

  2. Run the mobile client and add the device to the mobile client.

Hikvision DS-K1T671TM-3XF - Steps - 1

For details, see the user manual of the mobile client.

  1. Enter Basic Settings → Shortcut Key and enable Call APP.

  2. Go back to the initial page and call the mobile client.

1) Tap on the device initial page.

2) Tap to call the mobile client.

7.13 Temperature Measurement Settings

You can set the temperature measurement parameters, including temperature detection, over-temperature alarm threshold, temperature compensation, door not open when temperature is abnormal, temperature measurement mode, temperature unit, etc.

On the Home page, tap Temperature to enter the Temperature page. Edit the temperature measurement parameters on this page and tap √ to save the settings.

Temperature Temp. Detection Normal Temp. (Max.) 37.3 > Normal Temp. (Min.) 35.0 > Temp. Compensation 0.0 > Door Not Open (Abnormal Temp.) Temperature Measurement Only Unit °C > Measurement Area Calibration >

Figure 7-18 Temperature Measurement Parameters

The available parameters descriptions are as follows:

Table 7-3 Temperature Measurement ParametersDescriptions

Parameter Description
Temp. DetectionWhen enabling the function, the device will authenticate the permissions and at the same time take the temperature. When disabling the device, the device will authenticate the permissions only.
Norm Temp. (Max./Min.) Edit the threshold according to actual situation. If the detected temperature is higher or lower than the configured parameters, an alarm will be triggered. By default, the value is 37.3°.
Temp. CompensationIf the measured temperature is higher/lower than the actual object's temperature, you can set the compensation temperature here. Available range: -99 °C to 99 °C
Door Not Open (Abnormal Temp.)When enabling the function, the door will not open when the detected temperature is higher or lower than the configured temperature threshold. By default, the function is enabled.
Temperature Measurement OnlyWhen enabling the function, the device will not authenticate the permissions, but only take the temperature. When disabling the function, the device will authenticate the permissions and at the same time take the temperature.
Unit Select a temperature unit according to your preference.
Measurement Area CalibrationConfigure the temperature measurement area.

Chapter 8 Operation via Web Browser

8.1 Login

You can login via the web browser or the remote configuration of the client software.

Hikvision DS-K1T671TM-3XF - Login - 1

Make sure the device is activated. For detailed information about activation, see Activation.

Login via Web Browser

Enter the device IP address in the address bar of the web browser and press Enter to enter the login page.

Hikvision DS-K1T671TM-3XF - Login via Web Browser - 1

Make sure that the IP address starts with "Https:".

Enter the device user name and the password. Click Login.

Login via Remote Configuration of Client Software

Download and open the client software. After adding the device, click 📋 to enter the Configuration page.

8.2 Forget Password

If you forget the password when logging in, you can change the password by email address or security questions.

On the login page, click Forget Password.

Select Verification Mode.

Security Question Verification

Answer the security questions.

E-mail Verification

  1. Export the QR code and send it to pw_recovery@hikvision.com as attachment.
  2. You will receive a verification code within 5 minutes in your reserved email.
  3. Enter the verification code into the verification code field to verify your identification.

Click Next, create a new password and confirm it.

8.3 Live View

You can view the live video of the device.

After logging in, you will enter the live view page. You can perform the live view, capture, video recording, and other operations.

Live View Search User Configuration admin Help Logout

Figure 8-1 Live View Page

Function Descriptions:

Hikvision DS-K1T671TM-3XF - Live View - 2

Select the image size when starting live view.

Hikvision DS-K1T671TM-3XF - Live View - 3

Set the volume when starting live view.

Hikvision DS-K1T671TM-3XF - Live View - 4

Note

If you adjust the volume when starting two-way audio, you may hear a repeated sounds.

Hikvision DS-K1T671TM-3XF - Note - 1

You can capture image when starting live view.

Hikvision DS-K1T671TM-3XF - Note - 2

Reserved function. You can zoom in the live view image.

Hikvision DS-K1T671TM-3XF - Note - 3

Start or stop live view.

Hikvision DS-K1T671TM-3XF - Note - 4

Start or stop video recording.

Hikvision DS-K1T671TM-3XF - Note - 5

Select the streaming type when starting live view. You can select from the main stream and the sub stream.

Hikvision DS-K1T671TM-3XF - Note - 6

Full screen view.

8.4 Person Management

Click and add the person's information, including the basic information, card, authentication mode, and the picture.

Click OK to save the person.

Add Basic Information

Click User → Add to enter the Add Person page.

Add the person's basic information, including the employee ID, the person's name, user level, floor No., and room No.

Click OK to save the settings.

Add Card

Click User → Add to enter the Add Person page.

Click Add Card and enter a card number.

Click OK to save the settings.

Add Face Picture

Click User → Add to enter the Add Person page.

Click + on the right to upload a face picture from the local PC.

Hikvision DS-K1T671TM-3XF - Add Face Picture - 1

The picture format should be JPG, JPEG or PNG. The size should be less than 200K.

Click OK to save the settings.

Set Permission Time

Click User → Add to enter the Add Person page.

Set Start Time and End Time.

Click OK to save the settings.

Set Access Control

Click User → Add to enter the Add Person page.

After check Administrator in Access Control, the added person can log in by authenticating face.

Click OK to save the settings.

Add Authentication Mode

Click User → Add to enter the Add Person page.

Set the authentication type.

Click OK to save the settings.

8.5 Search Event

Click Search to enter the Search page.

Enter the search conditions, including the event type, the employee ID, the name, the card No., the start time, and the end time, and click Search.

The results will be displayed on the right panel.

8.6 Configuration

8.6.1 Set Local Parameters

Set the live view parameters, record file saving path, and captured pictures saving path.

Set Live View Parameters

Click Configuration → Local to enter the Local page. Configure the stream type, the play performance, auto start live view, and the image format and click Save.

Set Record File Saving Path

Click Configuration → Local to enter the Local page. Select a record file size and select a saving path from your local computer and click Save.

You can also click Open to open the file folder to view details.

Set Captured Pictures Saving Path

Click Configuration → Local to enter the Local page. Select a saving path from your local computer and click Save.

You can also click Open to open the file folder to view details.

8.6.2 View Device Information

View the device name, language, model, serial No., QR code, version, temperature measurement version, number of channels, alarm input, alarm output, lock and RS-485, device capacity, etc.

Click Configuration → System → System Settings → Basic Information to enter the configuration page.

You can view the device name, language, model, serial No., QR code, version, temperature measurement version, number of channels, alarm input, alarm output, lock and RS-485, device capacity, etc.

8.6.3 Set Time

Set the device's time zone, synchronization mode, and the device time.

Click Configuration → System → System Settings → Time Settings.

Time Zone (GMT+08:00) Beijing, Urumqi, Singapore, Perth Time Sync. NTP Manual Server Address 2.com NTP Port 7 Interval 7 minute(s) Save

Figure 8-2 Time Settings

Click Save to save the settings after the configuration.

Time Zone

Select the device located time zone from the drop-down list.

Time Sync.

NTP

You should set the NTP server's IP address, port No., and interval.

Manual

By default, the device time should be synchronized manually. You can set the device time manually or check Sync. with Computer Time to synchronize the device time with the computer's time.

8.6.4 Set DST

Steps

  1. Click Configuration → System → System Settings → DST.

Enable DST Start Time Apr First Sun 02 End Time Oct Last Sun 02 DST Bias 30minute(s) Save

Figure 8-3 DST Page

  1. Check Enable DST.
  2. Set the DST start time, end time and bias time.

  3. Click Save to save the settings.

8.6.5 View Open Source Software License

Go to Configuration → System → System Settings → About Device, and click View Licenses to view the device license.

8.6.6 Upgrade and Maintenance

Reboot device, restore device parameters, and upgrade device version.

Reboot Device

Click Configuration → System → Maintenance → Upgrade & Maintenance.

Reboot Reboot the device. Restore Parameters Default Reset all the parameters, except the IP parameters and user information, to the default settings. Restore All Restore all parameters to default settings. Export Device Parameters Export Import Config File Device Parameters Import Upgrade Upgrade Settings Controller Import File Upgrade Online Upgrade Upgrade Note: The upgrading process will be 1 to 10 minutes, please don't disconnect power to the device during the process. The device reboots automatically after upgrading.

Figure 8-4 Upgrade and Maintenance Page

Click Reboot to start reboot the device.

Restore Parameters

Click Configuration → System → Maintenance → Upgrade & Maintenance.

Restore All

All parameters will be restored to the factory settings. You should activate the device before usage.

Default

The device will restore to the default settings, except for the device IP address and the user information.

Unlink the Hik-Connect account from the platform.

Import and Export Parameters

Click Configuration → System → Maintenance → Upgrade & Maintenance.

Export

Click Export to export the logs or device parameters.

Hikvision DS-K1T671TM-3XF - Export - 1

You can import the exported device parameters to another device.

Import

Click ☐ and select the file to import. Click Import to start import configuration file.

Upgrade

Click Configuration → System → Maintenance → Upgrade & Maintenance.

Select an upgrade type from the drop-down list. Click and select the upgrade file from your local PC. Click Upgrade to start upgrading.

If the device has been connected to Hik-Connect and network, when there is a new installation package in Hik-Connect, you can click Upgrade after Online Update to upgrade the device system.

Hikvision DS-K1T671TM-3XF - Upgrade - 1

Do not power off during the upgrading.

8.6.7 Log Query

You can search and view the device logs.

Go to Configuration → System → Maintenance → Log Query.

Set the major and minor type of the log type. Set the start time and end time for searching, and click Search.

The results will be displayed below, which including the No., time, the major type the minor type, the channel No., the local/remote user information, the remote host IP, etc.

8.6.8 Security Mode Settings

Set the security mode for logging in the client software.

On the Device for Management page, click Configuration → System → Security → Security Service.

Select a security mode from the drop-down list, and click Save.

Security Mode

High security level for user information verification when logging in the client software.

Compatible Mode

The user information verification is compatible with the old client software version when logging in.

Enable SSH

To raise network security, disable SSH service. The configuration is only used to debug the device for the professionals.

Enable HTTP

In order to increase the network security level when visiting websites, you can enable HTTP to acquire a more secure and encrypted network communication environment. The communication should authenticated by identity and encryption password after enabling HTTP, which is save.

8.6.9 Certificate Management

It helps to manage the server/client certificates and CA certificate.

Hikvision DS-K1T671TM-3XF - Certificate Management - 1

Note

The function is only supported by certain device models.

Create and Install Self-signed Certificate

Steps

  1. Go to Configuration → System → Security → Certificate Management.
  2. In the Certificate Files area, select a Certificate Type from the drop-down list.
  3. Click Create.
  4. Input certificate information.
  5. Click OK to save and install the certificate.

The created certificate is displayed in the Certificate Details area.

The certificate will be saved automatically.

  1. Download the certificate and save it to an asking file in the local computer.

  2. Send the asking file to a certification authority for signature.

  3. Import the signed certificate.

1) Select a certificate type in the Import Passwords area, and select a certificate from the local, and click Install.
2) Select a certificate type in the Import Communication Certificate area, and select a certificate from the local, and click Install.

Install Other Authorized Certificate

If you already has an authorized certificate (not created by the device), you can import it to the device directly.

Steps

  1. Go to Configuration → System → Security → Certificate Management.
  2. In the Import Passwords and Import Communication Certificate areas, select certificate type and upload certificate.
  3. Click Install.

Install CA Certificate

Before You Start

Prepare a CA certificate in advance.

Steps

  1. Go to Configuration → System → Security → Certificate Management.
  2. Create an ID in the Import CA Certificate area.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

The input certificate ID cannot be the same as the existing ones.

  1. Upload a certificate file from the local.
  2. Click Install.

8.6.10 Change Administrator's Password

Steps

  1. Click Configuration → User Management.
  2. Click
  3. Enter the old password and create a new password.
  4. Confirm the new password.
  5. Click OK.

Hikvision DS-K1T671TM-3XF - Steps - 1

Caution

The password strength of the device can be automatically checked. We highly recommend you change the password of your own choosing (using a minimum of 8 characters, including at least three kinds of following categories: upper case letters, lower case letters, numbers, and special characters) in order to increase the security of your product. And we recommend you change your password regularly, especially in the high security system, changing the password monthly or weekly can better protect your product.

Proper configuration of all passwords and other security settings is the responsibility of the installer and/or end-user.

8.6.11 Account Security Settings

You can change the security questions and answers, or the email address for the device. After change the settings, once you forgot the device password, you should answer the new questions or use the new email address to reset the device password.

Steps

  1. Click Configuration → System → User Management → Account Security Settings.

  2. Change the security questions or email address according your actual needs.

  3. Enter the device password and click OK to confirm changing.

8.6.12 View Device Arming/Disarming Information

View device arming type and arming IP address.

Go to Configuration → Arming/Disarming Information.

You can view the device arming/disarming information. Click Refresh to refresh the page.

8.6.13 Network Settings

Set TCP/IP, port, report strategy and platform access.

Set Basic Network Parameters

Click Configuration → Network → Basic Settings → TCP/IP.

DHCP IPv4 Address IPv4 Subnet Mask IPv4 Default Gateway Mac Address MTU Alarm Center IP Alarm Host Port NIC Type Auto DNS Server Auto DNS Preferred DNS Server Alternate DNS Server Save

Figure 8-5 TCP/IP Settings Page

Set the parameters and click Save to save the settings.

DHCP

If uncheck the function, you should set the IPv4 address, IPv4 subnet mask, IPv4 default gateway, MTU, and the device port.

If you check the function, the system will allocate the IPv4 address, IPv4 subnet mask, and the IPv4 default gateway automatically.

Hikvision DS-K1T671TM-3XF - DHCP - 1

Note

IP address of 192.168.1.64, and 192.168.1.7 are not suggested to use.

NIC Type

Select a NIC type from the drop-down list. By default, it is Auto.

DNS Server

Set the preferred DNS server and the Alternate DNS server according to your actual need.

Set Port Parameters

Set the HTTP, RTSP, HTTPS and Server port paraeters.

Click Configuration → Network → Basic Settings → Port.

HTTP

It refers to the port through which the browser accesses the device. For example, when the HTTP Port is modified to 81, you need to enter http://192.0.0.65:81 in the browser for login.

RTSP

It refers to the port of real-time streaming protocol.

HTTPS

Set the HTTPS for accessing the browser. Certificate is required when accessing.

Server

It refers to the port through which the client adds the device.

Report Strategy Settings

You can set the center group for uploading the log via the ISUP protocol.

Go to Configuration → Network → Basic Settings → Report Strategy.

You can set the center group and the system will transfer logs via ISUP protocol. Click Save to save the settings.

Center Group

Select a center group from the drop-down list.

Enable Main Channel

Click to Enable main channel settings.

Main Channel

Click Enable, and the device will communicate with the center via the main channel.

Hikvision DS-K1T671TM-3XF - Main Channel - 1

Note

N1 refers to wired network.

Platform Access

Platform access provides you an option to manage the devices via platform.

Steps

  1. Click Configuration → Network → Advanced → Platform Access to enter the settings page.
  2. Select the Platform Access Mode.

i Note

Hik-Connect is an application for mobile devices. With the App, you can view live image of the device, receive alarm notification and so on.

  1. Check the checkbox of Enable to enable the function.

  2. Optional: Check the checkbox of Custom, and you can set the server address by yourself.

  3. Create a Stream Encryption/Encryption Key for the device.

i Note

6 to 12 letters (a to z, A to Z) or numbers (0 to 9), case sensitive. You are recommended to use a combination of no less than 8 letters or numbers.

  1. Click Save to enable the settings.

Set ISUP Parameters

Set the ISUP parameters for accessing device via ISUP protocol.

Steps

i Note

The function should be supported by the device.

  1. Click Configuration → Network → Advanced Settings → Platform.
  2. Select ISUP from the platform access mode drop-down list.
  3. Check Enable.
  4. Set the ISUP version, server address, device ID, and the ISUP status.

i Note

If you select 5.0 as the version, you should set the ISUP key as well.

  1. Click Save.

Set Wi-Fi Parameters

Set the Wi-Fi parameters for device wireless connection.

Steps

i Note

The function should be supported by the device.

  1. Click Configuration → Network → Basic Settings → Wi-Fi.

Wi-Fi + Add Refresh Wi-Fi Name Operation 101-0000_0000_0000 14 8 101-0000_0000 14 8 101-0000_0100 14 8 101-0000_0150 14 8 101-0000_0200 14 8 101-0000_0250 14 8 101-0000_0300 14 8 101-0000_0350 14 8 101-0000_0400 14 8 WLAN Network Settings

Figure 8-6 Wi-Fi Settings Page

2. Check Wi-Fi.

3. Select a Wi-Fi

  • Click of a Wi-Fi in the list and enter the Wi-Fi password.
  • Click Add, and enter the SSID, working mode, and encryption type. Click Connect. When the Wi-Fi is connected, click OK.

4. Optional: Set the WLAN parameters.

1) Click Network Settings.
2) Set the IP address, subnet mask, and default gateway. Or check Enable DHCP and the system will allocate the IP address, subnet mask, and default gateway automatically.

5. Click OK.

8.6.14 Set Video and Audio Parameters

Set the image quality, resolution, and the device volume.

Set Video Parameters

Click Configuration → Video/Audio → Video.

Video Channel Camera1 Camera Name F62154362 Stream Type Main Stream Video Type Video&Audio Resolution 1280*720 Bitrate Type Constant Video Quality Low Frame Rate 25 fps Max. Bitrate 2048 Kbps Video Encoding H.264 I Frame Interval 50 Save

Figure 8-7 Video Settings Page

Set the video channel, camera name, stream type, the video type, the bitrate type, the frame rate, the Max. bitrate, the video encoding, and I Frame Interval. Click Save to save the settings after the configuration.

Set Audio Parameters

Click Configuration → Video/Audio → Audio.

Select the audio channel.

You can also drag the block to adjust the device input and output volume.

Click to enable Voice Prompt.

Click Save to save the settings after the configuration.

Hikvision DS-K1T671TM-3XF - Set Audio Parameters - 1

The functions vary according to different models. Refers to the actual device for details.

8.6.15 Customize Audio Content

Customize the output audio content when authentication succeeded and failed.

Steps

  1. Click Configuration → Video/Audio → Prompt.

Prompt Prompt TTS Custom Prompt Importing TTS Time Schedule Configuration Enable Temperature Broadcast Appetation None Time Period When Authentication Succeeded Time Duration Settings: 60:00:00 23:59:59 Language English Prompt of Authentication Success Authenticated Add Time Period When Authentication Failed Time Duration Settings: 60:00:00 23:59:59 Language English Prompt of Authentication Failure Authentication titled Add Save

Figure 8-8 Customize Audio Content

  1. Select Prompt as TTS(Text to Speech) to turn the text to audio content.
  2. Or you can select Prompt as Custom Prompt Importing.

1) Select Custom Type or you can import your custom prompt from local PC.
2) You can view the importing status of the custom prompts in the list.

Hikvision DS-K1T671TM-3XF - Steps - 2

Note

The audio file shall be in WAV format and mono, and the sampling rate shall be 8 K or 16 K. The amplitude of the audio file shall not exceed -3dB, and the size of the audio file size shall not exceed 512 K.

  1. Select time schedule.
  2. Enable the function.
  3. Optional: Click to enable Temperature Broadcast.
  4. Set the appellation.
  5. Set the time period when authentication succeeded.

1) Click Add.
2) Set the time duration and the language.

Hikvision DS-K1T671TM-3XF - Note - 1

Note

If authentication is succeeded in the configured time duration, the device will broadcast the configured content.

3) Enter the audio content.
4) Optional: Repeat substep 1 to 3.
5) Optional: Click 🔒 to delete the configured time duration.

  1. Set the time duration when authentication failed.

1) Click Add.
2) Set the time duration and the language.

Hikvision DS-K1T671TM-3XF - Note - 1

If authentication is failed in the configured time duration, the device will broadcast the configured content.

3) Enter the audio content.
4) Optional: Repeat substep 1 to 3.
5) Optional: Click 🔒 to delete the configured time duration.

  1. Optional: Add holiday schedule.

1) Click Add to add holiday schedule.
2) Repeat step 3 to 6.

  1. Click Save to save the settings.

8.6.16 Set Image Parameters

Set the video standard, WDR, brightness, contrast, saturation, and sharpness.

Steps

  1. Click Configuration → Image Adjustment.

Video Standard PAL(50HZ) WDR Disable Basic Parameter Image Adjustment Supplement Light Parameters Brightness —— 50 Contrast —— 50 Saturation —— 50 Sharpness —— 50 Default

Figure 8-9 Image Settings Page

  1. Configure the parameters to adjust the image.

Video Standard

Set the video frame rate when performing live view remotely. After changing the standard, you should reboot the device to take effect.

PAL

25 frames per second. Suitable for mainland China, Hong Kong (China), the Middle East countries, Europe countries, etc.

NTSC

30 frames per second. Suitable for the USA, Canada, Japan, Taiwan (China), Korea, the Philippines, etc.

WDR

Enable or disable the WDR function.

When there are both very bright and very dark areas simultaneously in the view, WDR balances the brightness level of the whole image and provide clear images with details.

Brightness/Contrast/Saturation/Sharpness

Drag the block or enter the value to adjust the live video's brightness, contrast, saturation, and sharpness.

Hikvision DS-K1T671TM-3XF - Brightness/Contrast/Saturation/Sharpness - 1

Start/end recording video.

Hikvision DS-K1T671TM-3XF - Brightness/Contrast/Saturation/Sharpness - 2

Capture the image.

  1. Click Default to restore the parameters to the default settings.

8.6.17 Set Supplement Light Brightness

Set the device supplement light brightness.

Steps

  1. Click Configuration → Image → Supplement Light Parameters.

Image Adjustment Supplement Light Parameters Supplement Light Type Supplement Light Supplement Light Mode Disable Default

Figure 8-10 Supplement Light Settings Page

  1. Select a supplement light type and mode from the drop-down list. If you select the mode as ON, you should set the brightness.

8.6.18 Time and Attendance Settings

If you want to track and monitor when the persons start/stop work and monitor their working hours and late arrivals, early departures, time taken on breaks, and absenteeism, you can add the person to the shift group and assign a shift schedule (a rule for the attendance defining how the schedule repeats, the shift type, break settings, and the card swiping rule.) to the shift group to define the attendance parameters for the persons in the shift group.

Disable Attendance Mode via Web

Disable the attendance mode and the system will not display the attendance status on the initial page.

Steps

  1. Click Configuration → Attendance to enter the settings page.
  2. Set the Attendance Mode as Disable.

Result

You will not view or configure the attendance status on the initial page. And the system will follow the attendance rule that configured on the platform.

Time Settings

Steps

  1. Click Configuration → Time Settings to enter the settings page.
  2. Select Status Type.
  3. Optional: Edit Schedule Name according to the actual needs.
  4. Drag mouse to set the schedule.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

Set the schedule from Monday to Sunday according to the actual needs.

  1. Optional: Select a timeline and click Delete. Or click Delete All to clear the settings.
  2. Click Save.

Set Manual Attendance via Web

Set the attendance mode as manual, and you should select a status manually when you take attendance.

Before You Start

Add at least one user, and set the user's authentication mode. For details, see User Management.

Steps

  1. Click Configuration → Attendance to enter the settings page.
  2. Set the Attendance Mode as Manual.
  3. Enable the Attendance Status Required and set the attendance status lasts duration.
  4. Enable a group of attendance status.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

The Attendance Property will not be changed.

  1. Optional: Select an status and change its name if required.

Result

You should select an attendance status manually after authentication.

Hikvision DS-K1T671TM-3XF - Result - 1

Note

If you do not select a status, the authentication will be failed and it will not be marked as a valid attendance.

Set Auto Attendance via Web

Set the attendance mode as auto, and you can set the attendance status and its available schedule. The system will automatically change the attendance status according to the configured schedule.

Before You Start

Add at least one user, and set the user's authentication mode. For details, see User Management.

Steps

  1. Click Configuration → Attendance to enter the settings page.
  2. Set the Attendance Mode as Auto.
  3. Enable the Attendance Status function.
  4. Enable a group of attendance status.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

The Attendance Property will not be changed.

  1. Optional: Select an status and change its name if required.
  2. Set the status' schedule. Refers to Time Settings for details.

Set Manual and Auto Attendance via Web

Set the attendance mode as Manual and Auto, and the system will automatically change the attendance status according to the configured schedule. At the same time you can manually change the attendance status after the authentication.

Before You Start

Add at least one user, and set the user's authentication mode. For details, see User Management.

Steps

  1. Click Configuration → Attendance to enter the settings page.
  2. Set the Attendance Mode as Manual and Auto.
  3. Enable the Attendance Status function.
  4. Enable a group of attendance status.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

The Attendance Property will not be changed.

  1. Optional: Select an status and change its name if required.
  2. Set the status' schedule. Refers to Time Settings for details.

Result

On the initial page and authenticate. The authentication will be marked as the configured attendance status according to the schedule. If you tap the edit icon on the result tab, you can select a status to take attendance manually, the authentication will be marked as the edited attendance status.

Example

If set the Break Out as Monday 11:00, and Break In as Monday 12:00, the valid user's authentication from Monday 11:00 to 12:00 will be marked as break.

8.6.19 General Settings

Set Authentication Parameters

Click Configuration → General → Authentication Settings.

Hikvision DS-K1T671TM-3XF - Set Authentication Parameters - 1

Note

The functions vary according to different models. Refers to the actual device for details.

Click Save to save the settings after the configuration.

Card Reader

Select Main Card Reader or Sub Card Reader from the drop-down list.

Main Card Reader

You can configure the device card reader's parameters.

Sub Card Reader

You can configure the connected peripheral card reader's parameters.

If select Main Card Reader:

Card Reader Type/Card Reader Description

Get card reader type and description. They are read-only.

Enable Card Reader

Enable the card reader's function.

Authentication

Select an authentication mode according to your actual needs from the drop-down list.

Recognition Interval

You can set the interval between 2 continuous recognition of a same person during the authentication. In the configured interval, Person A can only recognized once. If another person (Person B) has recognized during the interval, Person A can recognized again.

Authentication Interval

You can set the authentication interval of the same person when authenticating. The same person can only authenticate once in the configured interval. A second authentication will be failed.

Alarm of Max. Failed Attempts

Enable to report alarm when the card reading attempts reach the set value.

Max. Authentication Failed Attempts

Enable to report alarm when the card reading attempts reach the set value.

Enable Tampering Detection

Enable the anti-tamper detection for the card reader.

Enable Card No. Reversing

The read card No. will be in reverse sequence after enabling the function.

If select Sub Card Reader:

Card Reader Type/Card Reader Description

Get card reader type and description. They are read-only.

Enable Card Reader

Enable the card reader's function.

Authentication

Select an authentication mode according to your actual needs from the drop-down list.

Recognition Interval

If the interval between card presenting of the same card is less than the configured value, the card presenting is invalid.

Alarm of Max. Failed Attempts

Enable to report alarm when the card reading attempts reach the set value.

Max. Authentication Failed Attempts

Enable to report alarm when the card reading attempts reach the set value.

Communication with Controller Every

When the access control device cannot connect with the card reader for longer than the set time, the card reader will turn offline automatically.

Max. Interval When Entering Password

When you entering the password on the card reader, if the interval between pressing two digits is longer than the set value, the digits you pressed before will be cleared automatically.

OK LED Polarity/Error LED Polarity

Set OK LED Polarity/Error LED Polarity of the access control device according to the card reader parameters. Generally, adopts the defaultsettings.

Enable Tampering Detection

Enable the anti-tamper detection for the card reader.

Set Privacy Parameters

Set the event storage type, picture upload and storage parameters, and the picture clearing parameters.

Go to Configuration → General → Privacy

Event Storage Settings

Select a method to delete the event. You can select from Delete Old Events Periodically, Delete Old Events by Specified Time, or Overwriting.

Delete Old Events Periodically

Drag the block or enter number to set the period for event deleting. All events will be deleted according to the configured time duration.

Delete Old Events by Specified Time

Set a time and all events will be deleted on the configured time.

Overwriting

The earliest 5% events will be deleted when the system detects the stored events has been over 95% of the full space.

Authentication Settings

Display Authentication Result

You can check Face Picture, Name, Employee ID and Temperature, to display the authentication result.

Picture Uploading and Storage

Upload Captured Picture When Authenticating

Upload the pictures captured when authenticating to the platform automatically.

Save Captured Picture When Authenticating

If you enable this function, you can save the picture when authenticating to the device.

Save Registered Picture

The registered face picture will be saved to the system if you enable the function.

Upload Picture After Linked Capture

Upload the pictures captured by linked camera to the platform automatically.

Save Pictures After Linked Capture

If you enable this function, you can save the picture captured by linked camera to the device.

Upload Thermographic Picture

Upload thermographic picture captured to the platform automatically.

Save Thermographic Picture

If you enable this function, you can save the thermographic picture captured to the device.

Clear All Pictures in Device

Hikvision DS-K1T671TM-3XF - Clear All Pictures in Device - 1

Note

All pictures cannot be restored once they are deleted.

Clear Registered Face Pictures

All registered pictures in the device will be deleted.

Clear Captured Pictures

All captured pictures in the device will be deleted.

Set Face Recognition Parameters

You can set face recognition parameters for accessing.

Click Configuration → General → Face Recognition Parameters.

You can set Working Mode as Access Control Mode. The access control mode is the device normal mode. You should authenticate your credential for accessing.

Click Save to save the settings after the configuration.

Set Card Security

Click Configuration → General → Card Security to enter the settings page.

Set the parameters and click Save.

Enable NFC Card

In order to prevent the mobile phone from getting the data of the access control, you can enable NFC card to increase the security level of the data.

Enable M1 Card

Enable M1 card and authenticating by presenting M1 card is available.

M1 Card Encryption

Sector

M1 card encryption can improve the security level of authentication.

Enable the function and set the encryption sector. By default, Sector 13 is encrypted. It is recommended to encrypt sector 13.

Enable EM Card

Enable EM card and authenticating by presenting EM card is available.

Hikvision DS-K1T671TM-3XF - Enable EM Card - 1

Note

If the peripheral card reader supports presenting EM card, the function is also supported to enable/disable the EM card function.

Enable DESFire Card

The device can read the data from DESFire card when enabling the DESFire card function.

DESFire Card Read Content

After enable the DESFire card content reading function, the device can read the DESFire card content.

Set Card Authentication Parameters

Set the card reading content when authenticate via card on the device.

Go to Configuration → General → Card Authentication Settings.

Select a card authentication mode and click Save.

Full Card No.

All card No. will be read.

Wiegand 26 (3 bytes)

The device will read card via Wiegand 26 protocol (read 3 bytes).

Wiegand 34 (4 bytes)

The device will read card via Wiegand 34 protocol (read 4 bytes).

8.6.20 Video Intercom Settings

Set Video Intercom Parameters

The device can be used as a door station, outer door station, or access control device. You should set the device No. before usage.

Click Configuration → Video Intercom → Device No. .

If set the device type as Door Station or Access Control Device, you can set the period No., building No., unit No., floor No., door station No., and community No.

Click Save to save the settings after the configuration.

Device Type Door Station Period No. 1 Building No. 1 Unit No. 1 Floor No. 1 Door Station No. 0 Community No. 0 Save

Figure 8-11 Device No. Settings

Device Type

The device can be used as a door station or outer door station. Select a device type from the drop-down list.

Hikvision DS-K1T671TM-3XF - Device Type - 1

Note

If you change the device type, you should reboot the device.

Period No.

Set the device installed period No.

Building No.

Set the device installed building No.

Unit No.

Set the device installed unit No.

Floor No.

Set the device installed floor No.

Door Station No.

Set the device installed floor No.

Hikvision DS-K1T671TM-3XF - Door Station No. - 1

Note

If you change the No., you should reboot the device.

Community No.

Set the device installed community No.

If set the device type as Outer Door Station, you can set the period No., outer door station No., and community No.

Period No.

Set the device installed period No.

Outer Door Station No.

If you select outer door station as the device type, you should enter a number between 1 and 99.

Hikvision DS-K1T671TM-3XF - Outer Door Station No. - 1

Note

If you change the No., you should reboot the device.

Community No.

Set the device installed community No.

Configure SIP Parameters

Set the device's IP address and the SIP server's IP address. After setting the parameters, you can communicate among the access control device, door station, indoor station, main station, and the platform.

Hikvision DS-K1T671TM-3XF - Configure SIP Parameters - 1

Note

Only the access control device and other devices or systems (such as door station, indoor station, main station, platform) are in the same IP segment, the two-way audio can be performed.

Go to Configuration → Access Control → Linked Network Settings.

Set the main station's IP address and SIP server's IP address.

Click Save.

Press Button to Call

Steps

  1. Click Intercom → Press Button to Call to enter the settings page.
  2. Set the parameters.

  3. Edit call No. for every button.

  4. Check Call Management Center to set the button calling center.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

If you check Call Management Center and set the call No. as well, call management center has higher privilege than call No.

8.6.21 Access Control Settings

Set Door Parameters

Click Configuration → Access Control → Door Parameters.

Door No. Door1 Name Open Duration 5 s Door Open Timeout Alarm 30 s Door Contact Remain Closed Remain Open Exit Button Type Remain Closed Remain Open Door Lock Powering OFF Remain Closed Remain Open Extended Open Duration 15 s Door Remain Open Duration with First Person 10 m Duress Code ------------------ Enter 0 to 8 digits. Super Password ------------------ Enter 0 to 8 digits. Save

Figure 8-12 Door Parameters Settings Page

Click Save to save the settings after the configuration.

Door No.

Select the device corresponded door No.

Name

You can create a name for the door.

Open Duration

Set the door unlocking duration. If the door is not opened for the set time, the door will be locked.

Door Open Timeout Alarm

An alarm will be triggered if the door has not been closed within the configured time duration.

Door Contact

You can set the door contact as Remain Open or Remain Closed according to your actual needs. By default, it is Remain Closed.

Exit Button Type

You can set the exit button as Remain Open or Remain Closed according to your actual needs. By default, it is Remain Open.

Door Lock Powering Off Status

You can set the door lock status when the door lock is powering off. By default, it is Remain Closed.

Extended Open Duration

The door contact can be enabled with appropriate delay after person with extended access needs swipes her/his card.

Door Remain Open Duration with First Person

Set the door open duration when first person is in. After the first person is authorized, it allows multiple persons access the door or other authentication actions.

Duress Code

The door can open by inputting the duress code when there is duress. At the same time, the client can report the duress event.

Super Password

The specific person can open the door by inputting the super password.

Hikvision DS-K1T671TM-3XF - Super Password - 1

Note

The duress code and the super code should be different.

Set RS-485 Parameters

You can set the RS-485 parameters including the peripheral, address, baud rate, etc.

Click Configuration → Access Control → RS-485 Settings.

Click Save to save the settings after the configuration.

No.

Set the RS-485 No.

Peripheral Type

Select a peripheral from the drop-down list according the actual situation. You can select from Card Reader, Extension Module, Access Controller, or Disable.

Hikvision DS-K1T671TM-3XF - Peripheral Type - 1

Note

After the peripheral is changed and saved, the device will reboot automatically.

RS-485 Address

Set the RS-485 Address according to your actual needs.

Hikvision DS-K1T671TM-3XF - RS-485 Address - 1

Note

If you select Access Controller: If connect the device to a terminal via the RS-485 interface, set the RS-485 address as 2. If you connect the device to a controller, set the RS-485 address according to the door No.

Baud Rate

The baud rate when the devices are communicating via the RS-485 protocol.

Set Wiegand Parameters

You can set the Wiegand transmission direction.

Steps

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

Some device models do not support this function. Refer to the actual products when configuration.

  1. Click Configuration → Access Control → Wiegand Settings.

Wiegand Wiegand Direction ○ Input ● Output Wiegand Mode ○ Wiegand 26 ○ Wiegand 34 Save

Figure 8-13 Wiegand Page

  1. Check Wiegand to enable the Wiegand function.
  2. Set a transmission direction.

Input

The device can connect a Wiegand card reader.

Output

The can connect an external access controller. And the two devices will transmit the card No. via Wiegand 26 or 34.

  1. Click Save to save the settings.

Hikvision DS-K1T671TM-3XF - Note - 2

If you change the peripheral, and after you save the device parameters, the device will reboot automatically.

8.6.22 Set Biometric Parameters

Set Basic Parameters

Click Configuration → Smart → Smart.

Hikvision DS-K1T671TM-3XF - Set Biometric Parameters - 1

The functions vary according to different models. Refers to the actual device for details.

Face Anti-spoofing Live Face Detection Security Level Recognition Distance Application Mode Face Recognition Mode Normal Mode Continuous Face Recognition Interval Pitch Angle Yaw Angle Rating 1:1 Matching Threshold 1:N Matching Threshold Face Recognition Timeout Value Enable Hard Hat Detaction Face with Mask Detection Face without Mask Strategy None Face with Mask&Face (1:1) Face with Mask 1:N Matching Threshold ECO Mode ECO Mode Threshold ECO Mode (1:1) ECO Mode (1:N) Face with Mask&Face (1:1 ECO) Face with Mask 1:N Matching Threshold (ECO Mode) Save

Figure 8-14 Smart Settings Page

Click Save to save the settings after the configuration.

Face Anti-spoofing

Enable or disable the live face detection function. If enabling the function, the device can recognize whether the person is a live one or not.

Hikvision DS-K1T671TM-3XF - Face Anti-spoofing - 1

Note

Biometric recognition products are not completely applicable to anti-spoofing environments. If you require a higher security level, use multiple authentication modes.

Live Face Detection Security Level

After enabling the face anti-spoofing function, you can set the matching security level when performing live face authentication.

Recognition Distance

Select the distance between the authenticating user and the device camera.

Application Mode

Select either others or indoor according to actual environment.

Face Recognition Mode

Normal Mode

Recognize face via the camera normally.

Deep Mode

The device can recognize a much wider people range than the normal mode. This mode is applicable to a more complicated environment.

Continuous Face Recognition Interval

Set the time interval between two continuous face recognitions when authenticating.

Pitch Angle

The maximum pitch angle when starting face authentication.

Yaw Angle

The maximum yaw angle when starting face authentication.

Rating

Set the face rating according to your needs.

1:1 Matching Threshold

Set the matching threshold when authenticating via 1:1 matching mode. The larger the value, the smaller the false accept rate and the larger the false rejection rate.

1:N Matching Threshold

Set the matching threshold when authenticating via 1:N matching mode. The larger the value, the smaller the false accept rate and the larger the false rejection rate.

Face Recognition Timeout Value

Set the timeout value when face recognizing. If the face recognition time is longer than the configured value, the system will pop up a prompt.

Enable Hard Hat Detection

After enabling the hard hat detection, you can set the strategy.

None

The function is disabled. The device will not detect whether a person is wearing a hard hat or not.

Reminder of Wearing Hard Hat

If the person do not wear the hard hat when authenticating, the device will pop up a prompt and the door will open.

Must Wear Hard Hat

If the person do not wear the hard hat when authenticating, the device will pop up a prompt and the door will keep closed.

Face with Mask Detection

After enabling the face with mask detection, the system will recognize the captured face with mask picture. You can set face with mask1:N matching threshold, it's ECO mode, and the strategy.

None

The device will detect the face with mask without prompt.

Prompt and Open

If the person do not wear a face mask when authenticating, the device prompts a notification and the door will open.

Prompt and Not Open Door

If the person do not wear a face mask when authenticating, the device prompts a notification and the door keeps closed.

Face with Mask & Face (1:1)

Set the matching value when authenticating with face mask via 1:1 matching mode. The larger the value, the smaller the false accept rate and the larger the false rejection rate.

Face with Mask 1:N Matching Threshold

Set the matching threshold when authenticating with face mask via 1:N matching mode. The larger the value, the smaller the false accept rate and the larger the false rejection rate.

ECO Mode

After enabling the ECO mode, the device will use the IR camera to authenticate faces in the low light or dark environment. And you can set the ECO mode threshold, ECO mode (1:N), and ECO mode (1:1).

ECO Mode (1:1)

Set the matching threshold when authenticating via ECO mode 1:1 matching mode. The larger the value, the smaller the false accept rate and the larger the false rejection rate.

ECO Mode (1:N)

Set the matching threshold when authenticating via ECO mode 1:N matching mode. The larger the value, the smaller the false accept rate and the larger the false rejection rate

Face with Mask & Face (1:1 ECO)

Set the matching value when authenticating with face mask via ECO mode 1:1 matching mode. The larger the value, the smaller the false accept rate and the larger the false rejection rate.

Face with Mask 1:N Matching Threshold (ECO Mode)

Set the matching threshold when authenticating with face mask via ECO mode 1:N matching mode. The larger the value, the smaller the false accept rate and the larger the false rejection rate.

Set Recognition Area

Click Configuration → Smart → Area Configuration.

Drag the yellow frame in the live video to adjust the recognition area. Only the face within the area can be recognized by the system.

Click Save to save the settings.

Click or to record videos or capture pictures.

8.6.23 Set Theme

You can set the theme for the device.

Click Configuration → Theme.

Display Mode Authentication Mode Advertisement Simple Sleep Sleep after 60 5 Theme Management Add Theme (0/8) Theme Type: Picture Upload Play Schedule Select a theme first and then set the playing time Delete Delete All Slide Show Interval 5 5 Save

Figure 8-15 Notice Page

Display Mode

You can select from Authentication, Advertisement or Simple.

Authentication

After selecting this mode, the device displays the video preview screen and performs authentication.

After selecting this mode, the advertising area and identification authentication area of the device will be displayed on separate screens. Video and advertising information playback, welcome speech display are supported.

iNote

Up to 8 images and 3 videos can be uploaded. And the images should be JPG format and the videos should be MP4 format.

Simple

After selecting this mode, the live view of the authentication page will be disabled, and in the meanwhile, the person's name, employee ID, face pictures will all be hidden.

Sleep

Enable Sleep and the device will enter the sleep mode when no operation within the configured sleep time.

Sleep after

Set the device sleeping waiting time (second).

Theme Management

You can click + in the frame and upload the screen saver pictures from the local PC.

i Note

By now, there is only one theme can be added.

Play Schedule

After you have created a theme, you can select the theme and draw a schedule on the time line.

Select the drawn schedule and you can edit the exact start and end time.

Select the drawn schedule and you can click Delete or Delete All to delete the schedule.

Slide Show Interval

Drag the block or enter the number to set the slide show interval. The picture will be changed according to the interval.

8.6.24 Temperature Measurement Settings

Temperature Measurement Settings

You can set the temperature measurement parameters, including temperature measurement only, temperature unit, over-temperature threshold, temperature compensation, door not open when temperature is abnormal, etc.

Steps

  1. Click Configuration → Temperature → Temperature Settings.

Temperature Measurement ✓ Temperature Measurement Only ○ Capture White Light Picture ○ Unit Celsius ✓ Over-Temperature Threshold (Max.) 37.3 °C Over-Temperature Threshold (Min.) 35 °C Temperature Compensation 0 Door Not Open When Temperature is Abnormal ○ Save

Figure 8-16 Temperature Measurement Settings

  1. Enable Temperature Measurement.
  2. Configure the temperature measurement parameters.

Enable Temperature Detection

When enabling the function, the device will authenticate the permissions and at the same time take the temperature. When disabling the device, the device will authenticate the permissions only.

Over-Temperature Alarm Threshold (Max./Min.)

Edit the threshold according to actual situation. If the detected temperature is higher or lower than the configured parameters, an alarm will be triggered. By default, the value is 37.3^ .

Temperature Compensation

If the measured temperature is higher/lower than the actual object's temperature, you can set the compensation temperature here. Available range: -99 °C to 99 °C.

Door Not Open When Temperature is Abnormal

When enabling the function, the door will not open when the detected temperature is higher or lower than the configured temperature threshold. By default, the function is enabled.

Temperature Measurement Only

When enabling the function, the device will not authenticate the permissions, but only take the temperature. When disabling the function, the device will authenticate the permissions and at the same time take the temperature.

Capture White Light Picture

After enabling Temperature Measurement Only, you can enable Capture White Light

Picture. After enabling this function, the device will capture white light picture.

Measure Area Settings

Configure the temperature measurement area.

Unit

Select a temperature unit according to your preference.

4. Click Save.

Black Body Settings

The black body can correct the measuring temperature. You should set the black body parameters if the black body temperature measurement scene is required. If no black body is required, do not set the black body parameters, or the temperature may not correct.

Steps

  1. Click Configuration → Temperature → Black Body Settings.

Enable Black Body Correction Black Body Parameters Distance 1 m Emissivity 0.97 Temperature Unit Celsius Temperature 40 °C Save Clear Calibrate

Figure 8-17 Black Body Settings

  1. Enable black body correction function.

  2. Put a black body in front of the camera. Make sure there are no other objects between the camera and the black body.

  3. Set the distance between the black body and the camera (straight line), the emissivity of the black body, and the temperature unit.

Hikvision DS-K1T671TM-3XF - Steps - 2

Note

The black body's temperature is fixed.

  1. Click Calibrate, and draw the black body's position on the page. When + is displayed on the black body on the screen, the black body is calibrated.

  2. Click Save.

Measurement Area Settings

You can set the temperature measurement area.

Click Configuration → Temperature → Temperature Measurement Area.

Drag the block or enter values of the left, right, top and bottom margin to draw a temperature measurement area.

Click Save.

Chapter 9 Client Software Configuration

You can call the hotline to get the iVMS-4200 client software installation package.

9.1 Configuration Flow of Client Software

Follow the flow diagram below to configure on the client software.

Hikvision DS-K1T671TM-3XF - Configuration Flow of Client Software - 1

flowchart
graph TD
    A["Activate Device"] --> B["Add Online Device"]
    A --> C["Add Device by IP address or Domain Name"]
    A --> D["Add Device by IP Segment"]
    A --> E["Add Device by EHome Account"]
    A --> F["Import Devices in Batch"]
    B --> G["Group Management"]
    C --> G
    D --> G
    E --> G
    F --> G
    G --> H["Add Organization"]
    H --> I["Add Single Person"]
    H --> J["Import Person in Batch"]
    I --> K["Configure Schedule and Template"]
    K --> L["Set Access Group and Access Authority"]
    L --> M["Assign Access Authority"]
    M --> N["Configure Card Reader Authentication Mode"]
    M --> O["Configure Individual Authentication Mode"]
    M --> P["Configure Device Parameters"]
    M --> Q["Configure Remaining Open/Closed"]
    M --> R["Configure Other Parameters"]
    N --> S["Configure Linkage Actions"]
    O --> S
    P --> S
    Q --> S
    R --> S
    S --> T["Door Control"]

Figure 9-1 Flow Diagram of Configuration on Client Software

9.2 Device Management

The client supports managing access control devices and video intercom devices.

Example

You can control entrance & exit and manage attendance after adding access control devices to the client; you can perform video intercom with the indoor stations and door stations.

9.2.1 Add Device

The client provides three device adding modes including by IP/domain, IP segment, and ISUP protocol. The client also supports importing multiple devices in a batch when there are large amount of devices to be added.

Add Online Device

The active online devices in the same local subnet with the client software will be displayed on the Online Device area. You can click Refresh Every 60s to refresh the information of the online devices.

Add Single or Multiple Online Devices

The client can detect online devices which are in the same network as the PC running the client. You can select a detected online device displayed in the online device list and add it to the client. For detected online devices sharing the same user name and password, you can add them to the client in a batch.

Before You Start

  • The device(s) to be added are in the same network as the PC running the client.
  • The device(s) to be added have been activated.

Steps

  1. Click Device Management → Device。
  2. Click Online Device to show the online device area.

The searched online devices are displayed in the list.

Refresh Every 60s. Total (2) Filter IPv4 IPv6 Device Model Firmware Version Security Level Port Enhanced SDK Service Port Serial No. Boot Time 108.1743 108.1743 20.200019551 Y5.4dbuild 190321 Active 8000 N/A 2020-03-22 108.1743 108.1743 20.200019551 Y5.5.130baild 191 Active 8000 N/A 2020-03-22 Activate Add Close

Figure 9-2 Online Device

  1. In the Online Device area, check one or more online device(s), and click Add to open the device adding window.

Add Name IP Address Transmission Encryption... Port 8000 User Name Password Synchronize Time Import to Group Set the device name as the group name and add all the channels connected to the device to the group. Add Cancel

Figure 9-3 Add Single Online Device
Add User Name Password Synchronize Time Import to Group Set the device name as the group name and add all the channels connected to the device to the group. Add Cancel

Figure 9-4 Add Multiple Online Devices

  1. Enter the required information.

Name

Enter a descriptive name for the device.

IP Address

Enter the device's IP address. The IP address of the device is obtained automatically in this adding mode.

Port

You can customize the port number. The port number of the device is obtained automatically in this adding mode.

User Name

By default, the user name is admin.

Password

Enter the device password.

Hikvision DS-K1T671TM-3XF - Password - 1

The password strength of the device can be automatically checked. We highly recommend you change the password of your own choosing (using a minimum of 8 characters, including at least three kinds of following categories: upper case letters, lower case letters, numbers, and special characters) in order to increase the security of your product. And we recommend you change your password regularly, especially in the high security system, changing the password monthly or weekly can better protect your product.

Proper configuration of all passwords and other security settings is the responsibility of the installer and/or end-user.

  1. Optional: Check Transmission Encryption (TLS) to enable transmission encryption using TLS (Transport Layer Security) protocol for security purpose.

i Note

• This function should be supported by the device.
- If you have enabled Certificate Verification, you should click Open Certificate Directory to open the default folder, and copy the certificate file exported from the device to this default directory to strengthen the security. See for details about enabling certificate verification.
- You can log into the device to get the certificate file by web browser.

  1. Check Synchronize Time to synchronize the device time with the PC running the client after adding the device to the client.

  2. Optional: Check Import to Group to create a group by the device name, and import all the channels of the device to this group.

Example

For access control device, its access points, alarm inputs/outputs, and encoding channels (if exist) will be imported to this group.

  1. Click Add.

Add Multiple Detected Online Devices

For detected online devices sharing the same user name and password, you can add them to the client in a batch.

Before You Start

Make sure the to-be-added devices are online.

Steps

  1. Enter the Device Management module.
  2. Click Device tab on the top of the right panel.

  3. Click Online Device to show the online device area at the bottom of the page.

The searched online devices are displayed in the list.

  1. Select multiple devices.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

For the inactive device, you need to create the password for it before you can add the device properly. For details, refer to .

  1. Click Add to open the device adding window.

  2. Enter the required information.

User Name

By default, the user name is admin.

Password

Enter the device password.

Hikvision DS-K1T671TM-3XF - Password - 1

Caution

The password strength of the device can be automatically checked. We highly recommend you change the password of your own choosing (using a minimum of 8 characters, including at least three kinds of following categories: upper case letters, lower case letters, numbers, and special characters) in order to increase the security of your product. And we recommend you change your password regularly, especially in the high security system, changing the password monthly or weekly can better protect your product.

Proper configuration of all passwords and other security settings is the responsibility of the installer and/or end-user.

  1. Optional: Check Synchronize Time to synchronize the device time with the PC running the client after adding the device to the client.

  2. Optional: Check Import to Group to create a group by the device name, and import all the channels of the device to this group.

Example

For access control device, its access points, alarm inputs/outputs, and encoding channels (if exist) will be imported to this group.

  1. Click Add to add the devices.

Add Device by IP Address or Domain Name

If you know the IP address or domain name of the device to add, you can add devices to the client by specifying the IP address (or domain name), user name, password, etc.

Steps

  1. Enter Device Management module.
  2. Click Device tab on the top of the right panel.

The added devices are displayed on the right panel.

  1. Click Add to open the Add window, and then select IP/Domain as the adding mode.
  2. Enter the required information.

Name

Create a descriptive name for the device. For example, you can use a nickname that can show the location or feature of the device.

Address

The IP address or domain name of the device.

Port

The devices to add share the same port number. The default value is 8000.

User Name

Enter the device user name. By default, the user name is admin.

Password

Enter the device password.

Hikvision DS-K1T671TM-3XF - Password - 1

Caution

The password strength of the device can be automatically checked. We highly recommend you change the password of your own choosing (using a minimum of 8 characters, including at least three kinds of following categories: upper case letters, lower case letters, numbers, and special characters) in order to increase the security of your product. And we recommend you change your password regularly, especially in the high security system, changing the password monthly or weekly can better protect your product.

Proper configuration of all passwords and other security settings is the responsibility of the installer and/or end-user.

  1. Optional: Check Transmission Encryption (TLS) to enable transmission encryption using TLS (Transport Layer Security) protocol for security purpose.

Hikvision DS-K1T671TM-3XF - Caution - 1

Note

  • This function should be supported by the device.
  • If you have enabled Certificate Verification, you should click Open Certificate Directory to open the default folder, and copy the certificate file exported from the device to this default directory to strengthen the security. See for details about enabling certificate verification.
  • You can log into the device to get the certificate file by web browser.

  • Check Synchronize Time to synchronize the device time with the PC running the client after adding the device to the client.

  • Optional: Check Import to Group to create a group by the device name, and import all the channels of the device to this group.

Example

For access control device, its access points, alarm inputs/outputs, and encoding channels (if exist) will be imported to this group.

  1. Finish adding the device.

  2. Click Add to add the device and back to the device list page.

  3. Click Add and New to save the settings and continue to add other device.

Add Devices by IP Segment

If the devices share the same port No., user name and password, and their IP addresses ranges in the same IP segment, you can add them to the client by specifying the start IP address and the end IP address, port No., user name, password, etc of the devices.

Steps

  1. Enter the Device Management module.
  2. Click Device tab on the top of the right panel.

The added devices are displayed on the right panel.

  1. Click Add to open the Add window.
  2. Select IP Segment as the adding mode.
  3. Enter the required information.

Start IP

Enter a start IP address.

End IP

Enter an end IP address in the same network segment with the start IP.

Port

Enter the device port No. The default value is 8000.

User Name

By default, the user name is admin.

Password

Enter the device password.

Caution

The password strength of the device can be automatically checked. We highly recommend you change the password of your own choosing (using a minimum of 8 characters, including at least three kinds of following categories: upper case letters, lower case letters, numbers, and special characters) in order to increase the security of your product. And we recommend you change your password regularly, especially in the high security system, changing the password monthly or weekly can better protect your product. Proper configuration of all passwords and other security settings is the responsibility of the installer and/or end-user.

  1. Optional: Check Transmission Encryption (TLS) to enable transmission encryption using TLS (Transport Layer Security) protocol for security purpose.

i Note

  • This function should be supported by the device.
  • If you have enabled Certificate Verification, you should click Open Certificate Folder to open the default folder, and copy the certificate file exported from the device to this default directory to strengthen the security. See for details about enabling certificate verification.
  • You can log into the device to get the certificate file by web browser.

  • Check Synchronize Time to synchronize the device time with the PC running the client after adding the device to the client.

  • Optional: Check Import to Group to create a group by the device name, and import all the channels of the device to the group.
  • Finish adding the device.

- Click Add to add the device and back to the device list page.

- Click Add and New to save the settings and continue to add other device.

Add Device by ISUP Account

For access control devices supports ISUP 5.0 protocol, you can add them to the client by ISUP protocol after entering device ID and key, if you have configured their server addresses, port No., and device IDs.

Before You Start

Make sure the devices have connected to the network properly.

Steps

  1. Enter Device Management module.
    The added devices are displayed on the right panel.
  2. Click Add to open the Add window.
  3. Select ISUP as the adding mode.
  4. Enter the required information.

Device Account

Enter the account name registered on ISUP protocol.

ISUP Key

For ISUP 5.0 devices, enter the ISUP key if you have set it when configuring network center parameter for the device.

i Note

This function should be supported by the device.

  1. Optional: Check Synchronize Time to synchronize the device time with the PC running the client after adding the device to the client.
  2. Optional: Check Import to Group to create a group by the device name, and import all the channels of the device to the group.
  3. Finish adding the device.

  4. Click Add to add the device and go back to the device list.

  5. Click Add and New to save the settings and continue to add other device.

  6. Optional: Perform the following operation(s).

Device Status Click on Operation column to view device status.

Edit Device InformationClick ☑ on Operation column to edit the device information, such as device name, device account, and ISUP key.
Check Online UserClick ☐ on Operation column to check the online users who access the device, such as user name, user type, user's IP address, and login time.
RefreshClick ☑ on Operation column to get the latest device information.
Delete DeviceSelect one or multiple devices and click Delete to delete the selected device(s) from the client.

Import Devices in a Batch

You can add multiple devices to the client in a batch by entering the device parameters in a pre-defined CSV file.

Steps

  1. Enter the Device Management module.
  2. Click Device tab on the top of the right panel.
  3. Click Add to open the Add window, and then select Batch Import as the adding mode.
  4. Click Export Template and then save the pre-defined template (CSV file) on your PC.
  5. Open the exported template file and enter the required information of the devices to be added on the corresponding column.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

For detailed description of the required fields, refer to the introductions in the template.

Adding Mode

Enter 0 or 1 or 2.

Address

Edit the address of the device.

Port

Enter the device port number. The default port number is 8000.

User Name

Enter the device user name. By default, the user name is admin.

Password

Enter the device password.

Caution

The password strength of the device can be automatically checked. We highly recommend you change the password of your own choosing (using a minimum of 8 characters, including at least three kinds of following categories: upper case letters, lower case letters, numbers, and special characters) in order to increase the security of your product. And we recommend you change your password regularly, especially in the high security system, changing the password monthly or weekly can better protect your product.

Proper configuration of all passwords and other security settings is the responsibility of the installer and/or end-user.

Import to Group

Enter 1 to create a group by the device name. All the channels of the device will be imported to the corresponding group by default. Enter 0 to disable this function.

  1. Click and select the template file.
  2. Click Add to import the devices.

9.2.2 Reset Device Password

If you forgot the password of the detected online devices, you can reset the device password via the client.

Steps

  1. Enter Device Management page.
  2. Click Online Device to show the online device area.

All the online devices sharing the same subnet will be displayed in the list.

  1. Select the device from the list and click 📋 on the Operation column.
  2. Reset the device password.

- Click Generate to pop up the QR Code window and click Download to save the QR code to your PC. You can also take a photo of the QR code to save it to your phone. Send the picture to our technical support.

Hikvision DS-K1T671TM-3XF - Steps - 1

For the following operations for resetting the password, contact our technical support.

Caution

The password strength of the device can be automatically checked. We highly recommend you change the password of your own choosing (using a minimum of 8 characters, including at least three kinds of following categories: upper case letters, lower case letters, numbers, and special characters) in order to increase the security of your product. And we recommend you change your password regularly, especially in the high security system, changing the password monthly or weekly can better protect your product.

Proper configuration of all passwords and other security settings is the responsibility of the installer and/or end-user.

9.3 Group Management

The client provides groups to manage the added resources in different groups. You can group the resources into different groups according to the resources' locations.

Example

For example, on the 1st floor, there mounted 16 doors, 64 alarm inputs, and 16 alarm outputs. You can organize these resources into one group (named 1st Floor) for convenient management. You can control door status, and do some other operations of the devices after managing the resources by groups.

9.3.1 Add Group

You can add group to organize the added device for convenient management.

Steps

  1. Enter the Device Management module.
  2. Click Device Management → Group to enter the group management page.
  3. Create a group.

- Click Add Group and enter a group name as you want.

- Click Create Group by Device Name and select an added device to create a new group by the name of the selected device.

Hikvision DS-K1T671TM-3XF - Steps - 1

The resources (such as alarm inputs/outputs, access points, etc.) of this device will be imported to the group by default.

9.3.2 Import Resources to Group

You can import the device resources (such as alarm inputs/outputs, access points, etc.) to the added group in a batch.

Before You Start

Add a group for managing devices. Refer to Add Group.

Steps

  1. Enter the Device Management module.
  2. Click Device Management → Group to enter the group management page.
  3. Select a group from the group list and select the resource type as Access Point, Alarm Input, Alarm Output, etc.
  4. Click Import.

  5. Select the thumbnails/names of the resources in the thumbnail/list view.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

You can click or to switch the resource display mode to thumbnail view or to list view.

  1. Click Import to import the selected resources to the group.

9.3.3 Edit Resource Parameters

After importing the resources to the group, you can edit the resource parameters. For access point, you can edit the access point name. For alarm input, you can edit the alarm input name. Here we take access point as an example.

Before You Start

Import the resources to group.

Steps

  1. Enter the Device Management module.
  2. Click Device Management → Group to enter the group management page.
    All the added groups are displayed on the left.
  3. Select a group on the group list and click Access Point.
    The access points imported to the group will display.
  4. Click ☐ in the Operation column to open the Edit Resource window.
  5. Edit the resource name.
  6. Click OK to save the new settings.

9.3.4 Remove Resources from Group

You can remove the added resources from the group.

Steps

  1. Enter the Device Management module.
  2. Click Device Management → Group to enter the group management page.
    All the added groups are displayed on the left.
  3. Click a group to show the resources added to this group.
  4. Select the resource(s) and click Delete to remove the resource(s) from the group.

9.4 Person Management

You can add person information to the system for further operations such as access control, video intercom, time and attendance, etc. You can manage the added persons such as issuing cards to them in a batch, importing and exporting person information in a batch, etc.

9.4.1 Add Organization

You can add an organization and import person information to the organization for effective management of the persons. You can also add a turbodinate organization for the added one.

Steps

  1. Enter Person module.
  2. Select a parent organization in the left column and click Add in the upper-left corner to add an organization.
  3. Create a name for the added organization.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

Up to 10 levels of organizations can be added.

  1. Optional: Perform the following operation(s).
Edit OrganizationHover the mouse on an added organization and click 📄 to edit its name.
DeleteHover the mouse on an added organization and click ✗ to delete it.

Organization

Hikvision DS-K1T671TM-3XF - Note - 1

  • The lower-level organizations will be deleted as well if you delete an organization.
  • Make sure there is no person added under the organization, or the organization cannot be deleted.
Show Persons in Sub OrganizationCheck Show Persons in Sub Organization and select an organization to show persons in its sub organizations.

9.4.2 Configure Basic Information

You can add person to the client one by one and configure the person's basic information such as name, email, phone number, etc.

Steps

  1. Enter Person module.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

For the first time you enter Person module, a window pops up, and you can set the rules to generate person ID (letters and numbers supported) when adding person. When getting person information from device, if there are no person IDs, the person IDs will be generated according to the rule.

  1. Select an organization in the organization list to add the person.
  2. Click Add to open the adding person window.

The Person ID will be generated automatically.

  1. Enter the basic information including person name, telephone number, email address, validity period, etc.

  2. Confirm to add the person.

  3. Click Add to add the person and close the Add Person window.

  4. Click Add and New to add the person and continue to add other persons.

9.4.3 Issue a Card to One Person

When adding person, you can issue a card with a unique card number to the person as a credential. After issued, the person can access the doors which he/she is authorized to access by swiping the card on the card reader.

Steps

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

Up to five cards can be issued to one person.

  1. Enter Person module.
  2. Select an organization in the organization list to add the person and click Add.

Hikvision DS-K1T671TM-3XF - Note - 1

Note

Enter the person's basic information first. For details about configuring person's basic information, refer to Configure Basic Information.

  1. In the Credential → Card panel, click +.
  2. Enter the card number.

  3. Enter the card number manually.

  4. Place the card on the card enrollment station or card reader and click Read to get the card number. The card number will display in the Card No.field automatically.

Hikvision DS-K1T671TM-3XF - Note - 1

Note

You need to click Settings to set the card issuing mode and related parameters first. For details, refer to Set Card Issuing Parameters.

  1. Select the card type according to actual needs.

Normal Card

The card is used for opening doors for normal usage.

Duress Card

When the person is under duress, he/she can swipe the duress card to open the door. The door will be unlocked and the client will receive a duress event to notify the security personnel.

Patrol Card

This card is used for the inspection staff to check the their attendance of inspection. By swiping the card on the specified card reader, the person is marked as on duty of inspection at that time.

Dismiss Card

By swiping the card on the card reader, it can stop the buzzing of the card reader.

  1. Click Add.

The card will be issued to the person.

  1. Confirm to add the person.

  2. Click Add to add the person and close the Add Person window.

  3. Click Add and New to add the person and continue to add other persons.

9.4.4 Upload a Face Photo from Local PC

When adding person, you can upload a face photo stored in local PC to the client as the person's profile.

Steps

  1. Enter Person module.
  2. Select an organization in the organization list to add the person and click Add.

Hikvision DS-K1T671TM-3XF - Steps - 1

Enter the person's basic information first. For details about configuring person's basic information, refer to Configure Basic Information.

  1. Click Add Face in the Basic Information panel.
  2. Select Upload.
  3. Select a picture from the PC running the client.

Hikvision DS-K1T671TM-3XF - Steps - 2

The picture should be in JPG or JPEG format and smaller than 200 KB.

  1. Optional: Enable Verify by Device to check whether the facial recognition device managed in the client can recognize the face in the photo.

Hikvision DS-K1T671TM-3XF - Steps - 3

This function is hidden or shown according to the device capacity.

  1. Confirm to add the person.

  2. Click Add to add the person and close the Add Person window.

  3. Click Add and New to add the person and continue to add other persons.

9.4.5 Take a Photo via Client

When adding a person, you can take a photo of the her/him via the client and set this photo as the person's profile.

Before You Start

Make sure PC running the client has a camera or you have connected other USB camera to the PC.

Steps

  1. Enter Person module.
  2. Select an organization in the organization list to add the person and click Add to enter Add Person window.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

Enter the person's basic information first. For details, refer to Configure Basic Information.

  1. Click Add Face in the Basic Information area.
  2. Select Take Photo to enter Take Photo window.
  3. Optional: Enable Verify by Device to check whether the captured face photo can meet the uploading requirements.

Hikvision DS-K1T671TM-3XF - Note - 1

Note

This function is hidden or shown according to the device capacity.

  1. Take a photo.

1) Face to the camera and make sure your face is in the middle of the collecting window.
2) Click to capture a face photo.
3) Optional: Click to capture again.
4) Click OK to save the captured photo.

Take Photo Verify by Device Camera HP HD Camera OK Cancel

Figure 9-5 Take a Photo via Client

  1. Confirm to add the person.

  2. Click Add to add the person and close the Add Person window.

  3. Click Add and New to add the person and continue to add other persons.

9.4.6 Collect Face via Access Control Device

When adding person, you can collect the person's face via access control device added to the client which supports facial recognition function.

Steps

  1. Enter Person module.
  2. Select an organization in the organization list to add the person and click Add.

Hikvision DS-K1T671TM-3XF - Steps - 1

Enter the person's basic information first. For details about configuring person's basic information, refer to Configure Basic Information.

  1. Click Add Face in the Basic Information panel.
  2. Select Remote Collection.
  3. Select an added access control device or the enrollment station from the drop-down list.

Hikvision DS-K1T671TM-3XF - Steps - 2

If you select the enrollment station, you should click Login to set related parameters of the device including IP address, port No., user name, and password. Also, you can check Face Anti-Spoofing and select the liveness level as Low, Medium, or High.

Face Anti-Spoofing

If you check this function, then the device can detect whether the face to be collected is an authentic one.

  1. Collect face.

1) Face to the camera of the selected access control device and make sure your face is in the middle of the collecting window.
2) Click to capture a photo.
3) Click OK to save the captured photo.

  1. Confirm to add the person.

  2. Click Add to add the person and close the Add Person window.

  3. Click Add and New to add the person and continue to add other persons.

9.4.7 Configure Access Control Information

When adding a person, you can set her/his access control information, such as binding an access control group with the person, configuring PIN code, setting the person as a visitor, a blocklist person, or a super user, etc.

Steps

  1. Enter Person module.
  2. Select an organization in the organization list to add the person and click Add.
  3. In the Access Control area, click ☐ to select access group(s) for the person.

i Note

For details, refer to Set Access Group to Assign Access Authorization to Persons.

Access Control Access Group PIN Code Generate Super User Extended Door Open Time Add to Blocklist Mark as Visitor Device Operator

Figure 9-6 Configure Access Control Information

  1. Set a unique PIN code for the person which can be used for access authentication.

- Manually enter a PIN code containing 4 to 8 digits.

i Note

Persons' PIN codes cannot be repeated.

- Click Generate to randomly generate an unrepeated PIN code of 6 digits.

i Note

If there are repeated PIN codes, a prompt will pop up on the client. The admin can generate a new PIN code to replace the repeated PIN code and notify related persons.

  1. Check the person's operation permissions.

Super User

If the person is set as a super user, he/she will have authorization to access all the doors/floors and will be exempted from remaining closed restrictions, all anti-passback rules, and first person authorization.

Extended Door Open Time

Use this function for persons with reduced mobility. When accessing the door, the person will have more time than others to pass through doors.

For details about setting the door's open duration, refer to Configure Parameters for Door.

Add to Blocklist

Add the person to the blocklist and when the person tries to access doors/floors, an event will be triggered and sent to the client to notify the security personnel.

Mark as Visitor

If the person is a visitor, you should set the her/his valid times for visit.

i Note

The valid times for visit is between 1 and 100. You can also check No Limit, then there are no limited times for the visitor to access doors/floors.

Device Operator

For person with device operator role, he/she is authorized to operate on the access control devices.

i Note

The Super User, Extended Door Open Time, Add to Blocklist, and Mark as Visitor functions cannot be enabled concurrently. For example, if one person is set as super user, you cannot enable extended door open time for her/him, add her/him to the blocklist, or set her/him as visitor.

  1. Confirm to add the person.

  2. Click Add to add the person and close the Add Person window.

  3. Click Add and New to add the person and continue to add other persons.

9.4.8 Customize Person Information

You can customize the person properties which are not pre-defined in the client according to actual needs, e.g., place of birth. After customizing, when add a person, you can enter the custom information to make the person information complete.

Steps

  1. Enter Person module.
  2. Set the fields of custom information.

1) Click Custom Property.
2) Click Add to add a new property.
3) Enter the property name.
4) Click OK.

  1. Set the custom information when adding a person.

1) Select an organization in the organization list to add the person and click Add.

i Note

Enter the person's basic information first. For details about configuring person's basic information, refer to Configure Basic Information.

2) In the Custom Information panel, enter the person information.
3) Click Add to add the person and close the Add Person window, or click Add and New to add the person and continue to add other persons.

9.4.9 Configure Resident Information

If the person is resident, for video intercom purpose, you need to set the room number for her/him and bind an indoor station. After bound, you can call this person by calling the indoor station and perform video intercom with her/him.

Steps

  1. Enter Person module.
  2. Select an organization in the organization list to add the person and click Add.

Hikvision DS-K1T671TM-3XF - Steps - 1

Enter the person's basic information first. For details about configuring person's basic information, refer to Configure Basic Information.

  1. In the Resident Information panel, select the indoor station to bind it to the person.

Hikvision DS-K1T671TM-3XF - Steps - 2

If you select Analog Indoor Station, the Door Station field will display and you are required to select the door station to communicate with the analog indoor station.

  1. Enter the floor No. and room No. of the person.
  2. Confirm to add the person.

  3. Click Add to add the person and close the Add Person window.

  4. Click Add and New to add the person and continue to add other persons.

9.4.10 Configure Additional Information

When adding person, you can configure the additional information for the person, such as person's identity type, identity No., country, etc., according to actual needs.

Steps

  1. Enter Person module.
  2. Select an organization in the organization list to add the person and click Add.

Hikvision DS-K1T671TM-3XF - Steps - 1

Enter the person's basic information first. For details about configuring person's basic information, refer to Configure Basic Information.

  1. In the Additional Information panel, enter the additional information of the person, including person's ID type, ID No., job title, etc., according to actual needs.
  2. Confirm to add the person.

  3. Click Add to add the person and close the Add Person window.

  4. Click Add and New to add the person and continue to add other persons.

9.4.11 Import and Export Person Identify Information

You can import the information and pictures of multiple persons to the client software in a batch. Meanwhile, you can also export the person information and pictures and save them in your PC.

9.4.12 Import Person Information

You can enter the information of multiple persons in a predefined template (CSV/Excel file) to import the information to the client in a batch.

Steps

  1. Enter the Person module.
  2. Select an added organization in the list, or click Add in the upper-left corner to add an organization and then select it.
  3. Click Import to open the Import panel.
  4. Select Person Information as the importing mode.
  5. Click Download Template for Importing Person to download the template.
  6. Enter the person information in the downloaded template.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

  • If the person has multiple cards, separate the card No. with semicolon.
  • Items with asterisk are required.
  • By default, the Hire Date is the current date.

  • Click to select the CSV/Excel file with person information from local PC.

  • Click Import to start importing.

Hikvision DS-K1T671TM-3XF - Note - 1

Note

  • If a person No. already exists in the client's database, delete the existing information before importing.
  • You can import information of no more than 2,000 persons.

9.4.13 Import Person Pictures

After importing face pictures for the added persons to the client, the persons in the pictures can be identified by an added face recognition terminal. You can either import person pictures one by one, or import multiple pictures at a time according to your need.

Before You Start

Be sure to have imported person information to the client beforehand.

Steps

  1. Enter the Person module.

  2. Select an added organization in the list, or click Add in the upper-left corner to add an organization and then select it.

  3. Click Import to open the Import panel and check Face.
  4. Optional: Enable Verify by Device to check whether face recognition device managed in the client can recognize the face in the photo.
  5. Click to select a face picture file.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

  • The (folder of) face pictures should be in ZIP format.
    • Each picture file should be in JPG format and should be no larger than 200 KB.
  • Each picture file should be named as "Person ID_Name". The Person ID should be the same with that of the imported person information.

  • Click Import to start importing.

The importing progress and result will be displayed.

9.4.14 Export Person Information

You can export the added persons' information to local PC as a CSV/Excel file.

Before You Start

Make sure you have added persons to an organization.

Steps

  1. Enter the Person module.
  2. Optional: Select an organization in the list.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

All persons' information will be exported if you do not select any organization.

  1. Click Export to open the Export panel.
  2. Check Person Information as the content to export.
  3. Check desired items to export.
  4. Click Export to save the exported file in CSV/Excel file on your PC.

9.4.15 Export Person Pictures

You can export face picture file of the added persons and save in your PC.

Before You Start

Make sure you have added persons and their face pictures to an organization.

Steps

  1. Enter the Person module.
  2. Optional: Select an organization in the list.

i Note

All persons' face pictures will be exported if you do not select any organization.

  1. Click Export to open the Export panel and check Face as the content to export.

  2. Click Export to start exporting.

i Note

• The exported file is in ZIP format.
- The exported face picture is named as "Person ID_Name_0" ("0" is for a full-frontal face).

9.4.16 Delete Registered Pictures

You can delete face picture file of the added persons automatically.

Before You Start

Make sure you have saved the structure data.

Steps

  1. Enter the Person module.
  2. Optional: Select a person item in the list.
  3. Click Delete Registered Picture to delete the registered picture.

9.4.17 Get Person Information from Access Control Device

If the added access control device has been configured with person information (including person details and issued card information), you can get the person information from the device and import them to the client for further operations.

Steps

i Note

  • If the person name stored in the device is empty, the person name will be filled with the issued card No. after importing to the client.
  • If the card number or person ID (employee ID) stored on the device already exists in the client database, the person with this card number or person ID will not be imported to the client.

  • Enter Person module.

  • Select an organization to import the persons.
  • Click Get from Device.
  • Select an added access control device or the enrollment station from the drop-down list.

i Note

If you select the enrollment station, you should click Login, and set IP address, port No., user name and password of the device.

  1. Click Import to start importing the person information to the client.

Hikvision DS-K1T671TM-3XF - i Note - 1

Note

Up to 2,000 persons and 5,000 cards can be imported.

The person information, including person details, and the linked cards (if configured), will be imported to the selected organization.

9.4.18 Move Persons to Another Organization

You can move the added persons to another organization if you need.

Before You Start

• Make sure you have added at least two organizations.
• Make sure you have imported personinformation.

Steps

  1. Enter Person module.
  2. Select an organization in the left panel.
    The persons under the organization will be displayed in the right panel.
  3. Select the person to move.
  4. Click Change Organization.
  5. Select the organization to move persons to.
  6. Click OK.

9.4.19 Issue Cards to Persons in Batch

The client provides a convenient way to issue cards to multiple persons in a batch.

Steps

  1. Enter Person module.
  2. Click Batch Issue Cards.
    All the added persons with no card issued will be displayed in the right panel.
  3. Optional: Enter key words (name or person ID) in the input box to filter the person(s) that need issuing cards.
  4. Optional: Click Settings to set the card issuing parameters. For details, refer to Issue a Card by Local Mode.
  5. Click Initialize to initialize the card enrollment station or card reader to make it ready for issuing cards.
  6. Click the Card No. column and enter the card number.
  7. Place the card on the card enrollment station.
  8. Swipe the card on the card reader.
  9. Manually enter the card number and press the Enter key.
    The person(s) in the list will be issued with card(s).

9.4.20 Report Card Loss

If the person lost his/her card, you can report the card loss so that the card's related access authorization will be inactive.

Steps

  1. Enter Person module.
  2. Select the person you want to report card loss for and click Edit to open the Edit Person window.
  3. In the Credential → Card panel, click 📄 on the added card to set this card as lost card.

After reporting card loss, the access authorization of this card will be invalid and inactive. Other person who gets this card cannot access the doors by swiping this lost card.

  1. Optional: If the lost card is found, you can click 📄 to cancel the loss.

After cancelling card loss, the access authorization of the person will be valid and active.

  1. If the lost card is added in one access group and the access group is applied to the device already, after reporting card loss or cancelling card loss, a window will pop up to notify you to apply the changes to the device. After applying to device, these changes can take effect on the device.

9.4.21 Set Card Issuing Parameters

The client provides two modes for reading a card's number: via card enrollment station or via the card reader of the access control device. If a card enrollment station is available, connect it to the PC running the client by USB interface or COM, and place the card on the card enrollment to read the card number. If not, you can also swipe the card on the card reader of the added access control device to get the card number. As a result, before issuing a card to one person, you need to set the card issuing parameters including the issuing mode and related parameters.

When adding a card to one person, click Settings to open the Card Issuing Settings window.

Local Mode: Issue Card by Card Enrollment Station

Connect a card enrollment station to the PC running the client. You can place the card on the card enrollment station to get the card number.

Card Enrollment Station

Select the model of the connected card enrollment station

Hikvision DS-K1T671TM-3XF - Card Enrollment Station - 1

Note

Currently, the supported card enrollment station models include DS-K1F100-D8, DS-K1F100-M, DS-K1F100-D8E, and DS-K1F180-D8E.

Card Type

This field is only available when the model is DS-K1F100-D8E or DS-K1F180-D8E.

Select the card type as EM card or IC card according to the actual card type.

Serial Port

It is only available when the model is DS-K1F100-M.

Select the COM the card enrollment station connects to.

Buzzing

Enable or disable the buzzing when the card number is read successfully.

Card No. Type

Select the type of the card number according to actual needs.

M1 Card Encryption

This field is only available when the model is DS-K1F100-D8, DS-K1F100-D8E, or DS-K1F180-D8E.

If the card is M1 card, and if you need to enable the M1 Card Encryption function, you should enable this function and select the sector of the card to encrypt.

Remote Mode: Issue Card by Card Reader

Select an access control device added in the client and swipe the card on its card reader to read the card number.

9.5 Configure Schedule and Template

You can configure the template including holiday and week schedule. After setting the template, you can adopt the configured template to access groups when setting the access groups, so that the access group will take effect in the time durations of the template.

Hikvision DS-K1T671TM-3XF - Configure Schedule and Template - 1

Note

For access group settings, refer to Set Access Group to Assign Access Authorization to Persons.

9.5.1 Add Holiday

You can create holidays and set the days in the holidays, including start date, end date, and holiday duration in one day.

Steps

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

You can add up to 64 holidays in the software system.

  1. Click Access Control → Schedule → Holiday to enter the Holiday page.
  2. Click Add on the left panel.
  3. Create a name for the holiday.
  4. Optional: Enter the descriptions or some notifications of this holiday in the Remark box.
  5. Add a holiday period to the holiday list and configure the holiday duration.

i Note

Up to 16 holiday periods can be added to one holiday.

1) Click Add in the Holiday List field.
2) Drag the cursor to draw the time duration, which means in that duration of time, the configured access group is activated.

i Note

Up to 8 time durations can be set to one holiday period.

3) Optional: Perform the following operations to edit the time durations.

  • Move the cursor to the time duration and drag the time duration on the timeline bar to the desired position when the cursor turns to 📂
  • Click the time duration and directly edit the start/end time in the appeared dialog.
  • Move the cursor to the start or the end of time duration and drag to lengthen or shorten the time duration when the cursor turns to

4) Optional: Select the time duration(s) that need to be deleted, and then click ✗ in the Operation column to delete the selected time duration(s).

5) Optional: Click 📋 in the Operation column to clear all the time duration(s) in the time bar.

6) Optional: Click ✗ in the Operation column to delete this added holiday period from the holiday list.

6. Click Save.

9.5.2 Add Template

Template includes week schedule and holiday. You can set week schedule and assign the time duration of access authorization for different person or group. You can also select the added holiday(s) for the template.

Steps

i Note

You can add up to 255 templates in the software system.

  1. Click Access Control → Schedule → Template to enter the Template page.

i Note

There are two default templates: All-Day Authorized and All-Day Denied, and they cannot be edited or deleted.

All-Day Authorized

The access authorization is valid in each day of the week and it has no holiday.

All-Day Denied

The access authorization is invalid in each day of the week and it has no holiday.

  1. Click Add on the left panel to create a new template.
  2. Create a name for the template.
  3. Enter the descriptions or some notification of this template in the Remark box.
  4. Edit the week schedule to apply it to the template.

1) Click Week Schedule tab on the lower panel.

2) Select a day of the week and draw time duration(s) on the timeline bar.

Hikvision DS-K1T671TM-3XF - All-Day Denied - 1

Up to 8 time duration(s) can be set for each day in the week schedule.

3) Optional: Perform the following operations to edit the time durations.

  • Move the cursor to the time duration and drag the time duration on the timeline bar to the desired position when the cursor turns to 📂
  • Click the time duration and directly edit the start/end time in the appeared dialog.
  • Move the cursor to the start or the end of time duration and drag to lengthen or shorten the time duration when the cursor turns to

4) Repeat the two steps above to draw more time durations on the other days of the week.

  1. Add a holiday to apply it to the template.

Hikvision DS-K1T671TM-3XF - All-Day Denied - 2

Up to 4 holidays can be added to one template.

1) Click Holiday tab.
2) Select a holiday in the left list and it will be added to the selected list on the right panel.
3) Optional: Click Add to add a new holiday.

Hikvision DS-K1T671TM-3XF - All-Day Denied - 3

For details about adding a holiday, refer to Add Holiday.

4) Optional: Select a selected holiday in the right list and click ✗ to remove the selected one, or click Clear to clear all the selected holiday(s) in the right list.

  1. Click Save to save the settings and finish adding the template.

9.6 Set Access Group to Assign Access Authorization to Persons

After adding the person and configuring the person's credentials, you can create the access groups to define which person(s) can get access to which door(s) and then apply the access group to the access control device to take effect.

Steps

When the access group settings are changed, you need to apply the access groups to the devices again to take effect. The access group changes include changes of template, access group settings, person's access group settings, and related person details (including card number, face picture,

linkage between card number and linkage between card number and card password, card effective period, etc).

  1. Click Access Control → Authorization → Access Group to enter the Access Group interface.
  2. Click Add to open the Add window.
  3. In the Name text field, create a name for the access group as you want.
  4. Select a template for the access group.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

You should configure the template before access group settings. Refer to Configure Schedule and Template for details.

  1. In the left list of the Select Person field, select person(s) to assign access authority.
  2. In the left list of the Select Access Point field, select door(s), door station(s) or floor(s) for the selected persons to access.
  3. Click Save.

You can view the selected person(s) and the selected access point(s) on the right side of the interface.

Add Delete Apply All to Device Apply Changes to Device Applying Status Name Template Status Operation Access Group 2 All-Day Auth... To be Appl... Access Group 1 All-Day Auth... To be Appl... Access Group 3 All-Day Auth... To be Appl... Person TheName SerialNumber Organization Jake 1 New Organization Mike 2 New Organization Total 2 Record(s) | < > | 1 /1Page(s) Access Point Access Point Group Name Docer1_Access control host Access control host Docer2_Access control host Access control host Total 2 Record(s) K < > | 1 /1Page(s)

Figure 9-7 Display the Selected Person(s) and Access Point(s)

  1. After adding the access groups, you need to apply them to the access control device to take effect.

1) Select the access group(s) to apply to the access control device.
2) Click Apply All to Devices start applying all the selected access group(s) to the access control device or door station.
3) Click Apply All to Devices or Apply Changes to Devices.

Apply All to Devices

This operation will clear all the existed access groups of the selected devices and then apply the new access group to the device.

Apply Changes to Devices

This operation will not clear the existed access groups of the selected devices and only apply the changed part of the selected access group(s) to the device(s).

4) View the applying status in the Status column or click Applying Status to view all the applied access group(s).

Hikvision DS-K1T671TM-3XF - Apply Changes to Devices - 1

You can check Display Failure Only to filter the applying results.

The selected persons in the applied access groups will have the authorization to enter/exit the selected doors/door stations with their linked card(s).

  1. Optional: Click ☑ to edit the access group if necessary.

Hikvision DS-K1T671TM-3XF - Apply Changes to Devices - 2

If you change the persons' access information or other related information, you will view the promptAccess Group to Be Applied on the right corner of the client.

You can click the prompt to apply the changed data to the device. You can select either Apply Now or Apply Later.

Data Synchronization Data is changed. Click Apply Now to apply the updated data to the devices. Or you can apply it to devices later in Permission interface. Apply Now Apply Later

Figure 9-9 Data Synchronization

9.7 Configure Advanced Functions

You can configure the advanced functions of access control to meet some special requirements in different scene.

i Note

  • For the card related functions(the type of access control card), only the card(s) with access group applied will be listed when adding cards.
  • The advanced functions should be supported by the device.
  • Hover the cursor on the Advanced Function, and then Click 📄 to customize the advanced function(s) to be displayed.

9.7.1 Configure Device Parameters

After adding the access control device, you can configure the parameters of access control device, access control points.

Configure Parameters for Access Control Device

After adding the access control device, you can configure its parameters, including overlaying user information on picture, uploading pictures after capturing, saving captured pictures, etc.

Steps

  1. Click Access Control → Advanced Function → Device Parameter.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

If you can find Device Parameter in the Advanced Function list, Hover the cursor on the Advanced Function, and then Click to select the Device Parameter to be displayed.

  1. Select an access device to show its parameters on the right page.

  2. Turn the switch to ON to enable the corresponding functions.

Hikvision DS-K1T671TM-3XF - Note - 1

Note

  • The displayed parameters may vary for different access control devices.
  • Some of the following parameters are not listed in the Basic Information page, click More to edit the parameters.

Voice Prompt

If you enable this function, the voice prompt is enabled in the device. You can hear the voice prompt when operating in the device.

Upload Pic. After Linked Capture

Upload the pictures captured by linked camera to the system automatically.

Save Pic. After Linked Capture

If you enable this function, you can save the picture captured by linked camera to the device.

Face Recognition Mode

Normal Mode

Recognize face via the camera normally.

Deep Mode

The device can recognize a much wider people range than the normal mode. This mode is applicable to a more complicated environment.

Enable NFC Card

If enable the function, the device can recognize the NFC card. You can present NFC card on the device.

Enable M1 Card

If enable the function, the device can recognize the M1 card. You can present M1 card on the device.

Enable EM Card

If enable the function, the device can recognize the EM card. You can present EM card on the device.

Hikvision DS-K1T671TM-3XF - Enable EM Card - 1

If the peripheral card reader supports presenting EM card, the function is also supported to enable/disable the EM card function.

  1. Click OK.

  2. Optional: Click Copy to, and then select the access control device(s) to copy the parameters in the page to the selected device(s).

Configure Parameters for Door

After adding the access control device, you can configure its access point door parameters.

Steps

  1. Click Access Control → Advanced Function → Device Parameter.

  2. Select an access control device on the left panel, and then click to show the doors of the selected device.

  3. Select a door to show its parameters on the right page.

  4. Edit the door parameters.

Hikvision DS-K1T671TM-3XF - Steps - 1

The displayed parameters may vary for different access control devices.

- Some of the following parameters are not listed in the Basic Information page, click Advanced to edit the parameters.

Name

Edit the card reader name as desired.

Door Contact

You can set the door sensor as remaining closed or remaining open. Usually, it is remaining closed.

Exit Button Type

You can set the exit button as remaining closed or remaining open. Usually, it is remaining open.

Open Duration

After swiping the normal card and relay action, the timer for locking the door starts working.

Super Password

The specific person can open the door by inputting the super password.

Door Left Open Timeout Alarm

The alarm can be triggered if the door has not been closed in a configured time period. If it is set as 0, no alarm will be triggered.

Click Advanced to configure more parameters.

Extended Open Duration

The door contact can be enabled with appropriate delay after person with extended access needs swipes her/his card.

Duress Code

The door can open by inputting the duress code when there is duress. At the same time, the client can report the duress event.

Hikvision DS-K1T671TM-3XF - Duress Code - 1

Note

  • The duress code and the super code should be different.
  • The duress code and super password should be different from the authentication password.
  • The length of duress code and the super password is according to the device, usually it should contains 4 to 8 digits.

5. Click OK.

  1. Optional: Click Copy to, and then select the door/floor(s) to copy the parameters in the page to the selected doors/floor(s).

Hikvision DS-K1T671TM-3XF - Click OK. - 1

Note

The door's status duration settings will be copied to the selected doors as well.

Configure Parameters for Card Reader

After adding the access control device, you can configure its card reader parameters.

Steps

  1. Click Access Control Advanced Function Device Parameter.
  2. In the device list on the left, click to expand the door, select a card reader and you can edit the card reader's parameters on the right.
  3. Edit the card reader basic parameters in the Basic Information page.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

  • The displayed parameters may vary for different access control devices. There are part of parameters listed as follows. Refer to the user manual of the device for more details.
  • Some of the following parameters are not listed in the Basic Information page, click Advanced to edit the parameters.

Basic Information

Name

Edit the card reader name as desired.

Minimum Card Swiping Interval

If the interval between card swiping of the same card is less than the set value, the card swiping is invalid. You can set it as 0 to 255.

Alarm of Max. Failed Attempts

Enable to report alarm when the card reading attempts reach the set value.

Card Reader Type/Card Reader Description

Get card reader type and description. They are read-only.

Advanced

Enable Card Reader

Enable the function and e device can be used as an card reader.

OK LED Polarity/Error LED Polarity/Buzzer Polarity

Set OK LED Polarity/Error LED Polarity/Buzzer LED Polarity of main board according to the card reader parameters. Generally, adopts the default settings.

Max. Interval When Entering PWD

When you inputting the password on the card reader, if the interval between pressing two digits is larger than the set value, the digits you pressed before will be cleared automatically.

Tampering Detection

Enable the anti-tamper detection for the card reader.

Communicate with Controller Every

When the access control device cannot connect with the card reader for longer than the set time, the card reader will turn offline automatically.

Face 1:N Matching Threshold

Set the matching threshold when authenticating via 1:N matching mode. The larger the value, the smaller the false accept rate and the larger the false rejection rate when authentication.

Face Recognition Interval

The time interval between two continuous face recognitions when authenticating.

Face Anti-Spoofing

Enable or disable the live face detection function. If enabling the function, the device can recognize whether the person is a live one or not.

Face 1:1 Matching Threshold

Set the matching threshold when authenticating via 1:1 matching mode. The larger the value, the smaller the false accept rate and the larger the false rejection rate when authentication.

Application Mode

You can select indoor or others application modes according to actual environment.

Lock Authentication Failed Face

After enabling the Live Face Detection function, the system will lock the user's face for 5 minutes if the live face detection is failed for more than the configured attempts. The same user cannot authenticate via the fake face within 5 minutes. Within the 5 minutes, the user can authenticate via the real face twice continuously to unlock.

Liveness Level

After enabling Face Anti-Spoofing function, you can set the matching security level when performing live face authentication.

  1. Click OK.
  2. Optional: Click Copy to, and then select the card reader(s) to copy the parameters in the page to the selected card reader(s).

Configure Parameters for Alarm Output

After adding the access control device, if the device links to alarm outputs, you can configure the parameters.

Before You Start

Add access control device to the client, and make sure the device supports alarm output.

Steps

  1. Click Access Control → Advanced Function → Device Parameter to enter access control parameter configuration page.
  2. In the device list on the left, click to expand the door, select an alarm input and you can edit the alarm input's parameters on the right.
  3. Set the alarm output parameters.

Name

Edit the card reader name as desired.

Alarm Output Active Time

How long the alarm output will last after triggered.

  1. Click OK.
  2. Optional: Set the switch on the upper right corner to ON to trigger the alarm output.

9.7.2 Configure Remaining Open/Closed

You can set the status of the door as open or closed. For example, you can set the door remaining closed in the holiday, and set the door remaining open in the specified period of the work day.

Before You Start

Add the access control devices to the system.

Steps

  1. Click Access Control → Advanced Function → Remain Open/Closed to enter the Remain Open/Closed page.
  2. Select the door that need to be configured on the left panel.
  3. To set the door status during the work day, click the Week Schedule and perform the following operations.
    1) Click Remain Open or Remain Closed.
    2) Drag the cursor to draw the time duration, which means in that duration of time, the configured access group is activated.

Hikvision DS-K1T671TM-3XF - Steps - 1

Up to 8 time durations can be set to each day in the week schedule.

3) Optional: Perform the following operations to edit the time durations.

  • Move the cursor to the time duration and drag the time duration on the timeline bar to the desired position when the cursor turns to 📂
  • Click the time duration and directly edit the start/end time in the appeared dialog.
  • Move the cursor to the start or the end of time duration and drag to lengthen or shorten the time duration when the cursor turns to

4) Click Save.

Copy to Whole Week Select one duration on the time bar, click Copy to Whole Week to copy all the duration settings on this time bar to other week days.

Delete Selected Select one duration on the time bar, click Delete Selected to delete this duration.

Clear Click Clear to clear all the duration settings in the week schedule.

  1. To set the door status during the holiday, click the Holiday and perform the following operations.

1) Click Remain Open or Remain Closed.
2) Click Add.
3) Enter the start date and end date.
4) Drag the cursor to draw the time duration, which means in that duration of time, the configured access group is activated.

i Note

Up to 8 time durations can be set to one holiday period.

5) Perform the following operations to edit the time durations.

  • Move the cursor to the time duration and drag the time duration on the timeline bar to the desired position when the cursor turns to 📂
  • Click the time duration and directly edit the start/end time in the appeared dialog.
  • Move the cursor to the start or the end of time duration and drag to lengthen or shorten the time duration when the cursor turns to

6) Optional: Select the time duration(s) that need to be deleted, and then click ✗ in the Operation column to delete the selected time duration(s).
7) Optional: Click in the Operation column to clear all the time duration(s) in the time bar.
8) Optional: Click ✗ in the Operation column to delete this added holiday period from the holiday list.
9) Click Save.

  1. Optional: Click Copy to copy the door status settings of this door to other door(s).

9.7.3 Configure Multi-Factor Authentication

You can manage the persons by group and set the authentication for multiple persons of one access control point (door).

Before You Start

Set access group and apply the access group to the access control device. For details, refer to Set Access Group to Assign Access Authorization to Persons.

Perform this task when you want to set authentications for multiple cards of one access control point (door).

Steps

  1. Click Access Control → Advanced Function → Multi-Factor Auth.
  2. Select an access control device in device list on the left panel.
  3. Add a person/card group for the access control device.

1) Click Add on the right panel.
2) Create a name for the group as desired.
3) Specify the start time and end time of the effective period for the person/card group.
4) Select members(s) and card(s) in the Available list, and the selected member(s) and card(s) will be added to the Selected list.

i Note

Make sure you have issue card to the person.

Make sure you have set access group and apply the access group to the access control device successfully.

5) Click Save.
6) Optional: Select the person/card group(s), and then click Delete to delete it(them).

7) Optional: Select the person/card group(s), and then click Apply to re-apply access group that failed to be applied previously to the access control device.

  1. Select an access control point (door) of selected device on the left panel.
  2. Enter the maximum interval when entering password.
  3. Add an authentication group for the selected access control point.

1) Click Add on the Authentication Groups panel.

2) Select a configured template as the authentication template from the drop-down list.

Hikvision DS-K1T671TM-3XF - i Note - 1

For setting the template, refer to Configure Schedule and Template.

3) Select the authentication type as Local Authentication, Local Authentication and Remotely Open Door, or Local Authentication and Super Password from the drop-down list.

Local Authentication

Authentication by the access control device.

Local Authentication and Remotely Open Door

Authentication by the access control device and by the client. When the person swipes the card on the device, a window will pop up. You can unlock the door via the client.

Multiple Authentication Remote Controller Door Name: Device Name: 10.8.97.88 Request Time: 2019-02-28 15:13:40 Please process this request in 26 second Open Door Ignore

Figure 9-10 Remotely Open Door

Hikvision DS-K1T671TM-3XF - Local Authentication and Remotely Open Door - 2

You can check Offline Authentication to enable the super password authentication when the access control device is disconnected with the client.

Local Authentication and Super Password

Authentication by the access control device and by the super password.

4) Select the added person/card group in the left list below and it will be added to the Selected list on the right as the authentication group.
5) Click the added authentication group in the right list to set authentication times in the Auth Times column.

i Note

  • The authentication times should be larger than 0 and smaller than the added personnel quantity in the personnel group.
  • The maximum value of authentication times is 16.

6) Click Save.

iNote

  • For each access control point (door), up to four authentication groups can be added.
  • For the authentication group of which authentication type is Local Authentication, up to 8 person/card groups can be added to the authentication group.
  • For the authentication group of which authentication type is Local Authentication and Super Password or LocalAuthentication and Remotely Open Door, up to 7 person/card groups can be added to the authentication group.

7. Click Save.

9.7.4 Configure Card Reader Authentication Mode and Schedule

You can set the passing rules for the card reader of the access control device according to your actual needs.

Steps

  1. Click Access Control → Advanced Function → Authentication to enter the authentication mode configuration page.
  2. Select a card reader on the left to configure.
  3. Set card reader authentication mode.
    1) Click Configuration.

Card Reader Authentication Select the authentication mode that the card reader should support. Available Mode ✓ Card ✓ Card + PIN ☐ Card / PIN ✓ Fingerprint ☐ Fingerprint + PIN ☐ Fingerprint / Card ✓ Fingerprint + Card ☐ Fingerprint + Card + PIN ☐ Face / Fingerprint / Card / PIN ☐ Face + Fingerprint ☐ Face + PIN ✓ Face + Card ✓ Face Selected Mode ✓ Clear Card ✓ Card + PIN ✓ Fingerprint ✓ Fingerprint + Card Face ✓ Face + Card ✓ Face + Fingerprint + Card OK Cancel

Figure 9-11 Select Card Reader Authentication Mode

i Note

PIN refers to the PIN code set to open the door. Refer to Configure Access Control Information.

2) Check the modes in the Available Mode list and they will be added to the selected modes list.
3) Click OK.

After selecting the modes, the selected modes will display as icons with different color.

  1. Click the icon to select a card reader authentication mode, and drag the cursor to draw a color bar on the schedule, which means in that period of time, the card reader authentication is valid.
  2. Repeat the above step to set other time periods.

Template Access Group Advanced Function Device Parameters Domain Object/Closed Multi-Factor Auth Custom Manager Authentication First Person 10 Anti-Feedback Multi-Box Interlocking Mass Parameters Linkage Configuration Video Emotion 10.7.115.178 Advance Card Reader1 Exit Card Reader2 Card Reader Authentication Authentication Mode Configuration Card Card + PIN FP FP + Card Face Face + Card Face + FP + ... Copy to Week Delete Clear Mn: 0 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Tat: 0 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Wind: 0 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 The: 0 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 In: 0 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Sat: 0 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Set: 0 2 3 4 5 6 7 8 9 10 11 12 13

Figure 9-12 Set Authentication Modes for Card Readers

  1. Optional: Select a configured day and click Copy to Week to copy the same settings to the whole week.
  2. Optional: Click Copy to to copy the settings to other card readers.
  3. Click Save.

9.7.5 Configure First Person In

You can set multiple first persons for one access control point. After the first person is authorized, it allows multiple persons access the door or other authentication actions.

Before You Start

Set the access group and apply the access group to the access control device. For details, refer to Set Access Group to Assign Access Authorization to Persons.

Perform this task when you want to configure opening door with first person.

Steps

  1. Click Access Control → Advanced Function → First Person In to enter the First Person In page.
  2. Select an access control device in the list on the left panel.
  3. Select the current mode as Enable Remaining Open after First Person or Disable Remaining Open after First Person from the drop-down list for each access control point of the selected device.

Enable Remaining Open after First Person

The door remains open for the configured time duration after the first person is authorized until the remain open duration ends. If you select this mode, you should set the remain open duration.

i Note

The remain open duration should be between 0 and 1440 minutes. By default, the remain open duration is 10 minutes.

Disable Remaining Open after First Person

Disable the function of first person in, namely normal authentication.

i Note

You can authenticate by the first person again to disable the first person mode.

  1. Click Add on the First Person List panel.

  2. Select person(s) in the left list and the person(s) will be add to the selected persons as the first person(s) of the doors.

The added first person(s) will list in the First Person List

  1. Optional: Select a first person from the list and click Delete to remove the person from the first person list.

  2. Click Save.

9.7.6 Configure Anti-Passback

The anti-passback feature is designed to minimize the misuse or fraudulent use of access credentials such as passing back card to an unauthorized person, or tailed access. The anti-passback function establishes a specific sequence in which access credentials must be used in order to grant access. You can set the sequence according to the actual path via the client and if the person uses the credential in wrong sequence, you can also reset the anti-password records.

Before You Start

Add access control device to the client, and enable the anti-passing back function of the access control device.

Steps

i Note

Either the anti-passing back or multi-door interlocking function can be configured for an access control device at the same time. For the configuration of multi-door interlocking, refer to .

  1. Click Access Control → Advanced Function → Anti-Passback to enter the Anti-Passpack Settings page.
  2. Select an access control device on the left panel.
  3. Select a card reader as the beginning of the path in the First Card Reader field.
  4. Click ☑ of the selected first card reader in the Card Reader Afterward column to open the select card reader dialog.
  5. Select the afterward card readers for the first card reader.

i Note

Up to four afterward card readers can be added as afterward card readers for one card reader.

  1. Click OK in the dialog to save the selections.
  2. Click Save in the Anti-Passback Settings page to save the settings and take effect.

Example

Set Card Swiping Path: If you select Reader In_01 as the beginning, and select Reader In_02, Reader Out_04 as the linked card readers. Then you can only get through the access control point by swiping the card in the order as Reader In_01, Reader In_02 and Reader Out_04.

  1. Click Reset Anti-Passback and select the person(s) to delete the related anti-passback records about the person(s) on the device.

i Note

This function should be supported by the device.

9.7.7 Configure Device Parameters

After adding the access control device, you can set its parameters such as network parameters.

Set Multiple NIC Parameters

If the device supports multiple network interfaces, you can set the network parameters of these NICs via the client, such as IP address, MAC address, port number, etc.

Before You Start

Add access control device to the client, and make sure the device supports multiple NICs.

Steps

  1. Enter the Access Control module.
  2. On the navigation bar on the left, enter Advanced Function → More Parameters.
  3. Select an access control device in the device list and click NIC to enter Multiple NIC Settings page.
  4. Select an NIC you want to configure from the drop-down list.
  5. Set its network parameters such as IP address, default gateway, subnet mask, etc.

MAC Address

A media access control address (MAC address) is a unique identifier assigned to the network interface for communications on the physical network segment.

MTU

The maximum transmission unit (MTU) of the network interface.

  1. Click Save.

Set Network Parameters

After adding the access control device, you can set the device log uploading mode, and create ISUP account via wired or wireless network.

Set Log Uploading Mode

You can set the mode for the device to upload logs via ISUP protocol.

Steps

  1. Enter the Access Control module.
  2. On the navigation bar on the left, enter Advanced Function → More Parameters.
  3. Select an access control device in the device list and enter Network → Uploading Mode.
  4. Select the center group from the drop-down list.
  5. Check Enable to enable to set the uploading mode.
  6. Select the uploading mode from the drop-down list.
  7. Enable N1 or G1 for the main channel.
  8. Select Close to disable the main channel.

  9. Click Save.

Create ISUP Account in Wired Communication Mode

You can set the account for ISUP protocol in wired communication mode. Then you can add devices via ISUP protocol.

Steps

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

This function should be supported by the device.

  1. Enter the Access Control module.
  2. On the navigation bar on the left, enter Advanced Function → More Parameters.
  3. Select an access control device in the device list and enter Network → Network Center.
  4. Select the center group from the drop-down list.
  5. Select the Address Type as IP Address or Domain Name.
  6. Enter IP address or domain name according to the address type.
  7. Enter the port number for the protocol.

Hikvision DS-K1T671TM-3XF - Note - 1

Note

The port number of the wireless network and wired network should be consistent with the port number of ISUP.

  1. Select the Protocol Type as ISUP.

i Note

If set the ISUP version as 5.0, you should create an ISUP key for the ISUP account.

  1. Set an account name for the network center.

  2. Click Save.

Set Device Capture Parameters

You can configure the capture parameters of the access control device, including manual capture and event triggered capture.

i Note

  • The capture function should be supported by the device.
  • Before setting the capture parameters, you should set the picture storage first to define where the event triggered pictures are saved. For details, refer to Set Picture Storage in the user manual of the client software.

Set Triggered Capture Parameters

When an event occurs, the camera of the access control device can be triggered to capture picture(s) to record what happens when the event occurs. You can view the captured pictures when checking the event details in Event Center. Before that, you need to set the parameters for the capture such as number of pictures captured for one time.

Before You Start

Before setting the capture parameters, you should set the picture storage first to define where the captured pictures are saved. For details, refer to Set Picture Storage in the user manual of the client software.

Steps

i Note

This function should be supported by the device

  1. Enter the Access Control module.
  2. On the navigation bar on the left, enter Advanced Function → More Parameters → Capture.
  3. Select an access control device in the device list and select Linked Capture.
  4. Set the picture size and quality.
  5. Set the capture times once triggered which defines how many pictures will be captures for one time.
  6. If the capture times is more than 1, set the interval for each capture.
  7. Click Save.

Set Manual Capture Parameters

In Status Monitoring module, you can capture a picture manually the access control device's camera by clicking a button. Before that, you need to set the parameters for the capture such as picture quality.

Before You Start

Before setting the capture parameters, you should set the saving path first to define where the captured pictures are saved. For details, refer to Set Picture Storage in the user manual of the client software.

Steps

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

This function should be supported by the device

  1. Enter the Access Control module.
  2. On the navigation bar on the left, enter Advanced Function → More Parameters → Capture.
  3. Select an access control device in the device list and select Manual Capture.
  4. Select the resolution of the captured pictures from the drop-down list.
  5. Select the picture quality as High, Medium, or Low. The higher the picture quality is, the larger size the picture will be.
  6. Click Save.

Set Parameters for FaceRecognition Terminal

For face recognition terminal, you can set its parameters including face picture database, etc.

Steps

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

This function should be supported by the device.

  1. Enter the Access Control module.
  2. On the navigation bar on the left, enter Advanced Function → More Parameters.
  3. Select an access control device in the device list and click Face Recognition Terminal.
  4. Set the parameters.

Hikvision DS-K1T671TM-3XF - Note - 1

Note

These parameters displayed vary according to different device models.

Algorithm

Select Deep Learning as the face picture database.

Save Authentication Picture

If enabled, the captured face picture when authenticating will be saved on the device.

ECO Mode

After enabling the ECO mode, the device can authenticate faces in the low light or dark environment. And you can set the ECO mode threshold, ECO mode (1:N), and ECO mode (1:1).

ECO Mode (1:1)

Set the matching threshold when authenticating via ECO mode 1:1 matching mode. The larger the value, the smaller the false accept rate and the larger the false rejection rate.

ECO Mode (1:N)

Set the matching threshold when authenticating via ECO mode 1:N matching mode. The larger the value, the smaller the false accept rate and the larger the false rejection rate.

ECO Mode Threshold

When enabling the ECO mode, you can set the ECO mode's threshold. The larger the value, the easier the device entering the ECO mode. Available range: 0 to 8.

Face with Mask & Face 1:N (ECO)

Set the matching threshold when authenticating via face with mask & face in ECO mode 1:N matching mode. The larger the value, the smaller the false accept rate and the larger the false rejection rate.

Work Mode

Set the device work mode as Access Control Mode. The access control mode is the device normal mode. You should authenticate your credential for accessing.

5. Click Save.

Enable M1 Card Encryption

M1 card encryption can improve the security level of authentication.

Steps

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

The function should be supported by the access control device and the card reader.

  1. Enter the Access Control module.
  2. On the navigation bar on the left, enter Advanced Function → More Parameters.
  3. Select an access control device in the device list and click M1 Card Encryption Verification to enter the M1 Card Encryption Verification page.
  4. Set the switch to on to enable the M1 card encryption function.
  5. Set the sector ID.

i Note

• The sector ID ranges from 1 to 100.
- By default, Sector 13 is encrypted. It is recommended to encrypt sector 13.

  1. Click Save to save the settings.

Set RS-485 Parameters

You can set the access control device's RS-485 parameters including the baud rate, data bit, the stop bit, parity type, flow control type, communication mode, work mode, and connection mode.

Steps

iNote

The RS-485 Settings should be supported by the device.

  1. Enter the Access Control module.
  2. On the navigation bar on the left, enter Advanced Function → More Parameters.
  3. Select an access control device in the device list and click RS-485 to enter the RS-485 Settings page.
  4. Select the serial port number from the drop-down list to set the RS-485 parameters.
  5. Set the serial number, external device, authentication center, baud rate, data bit, stop bit, parity type, flow control type, communication mode, and working mode in the drop-down list.
  6. Click Save.

  7. The configured parameters will be applied to the device automatically.

  8. When you change the working mode or connection mode, the device will reboot automatically.

Set Wiegand Parameters

You can set the access control device's Wiegand channel and the communication mode. After setting the Wiegand parameters, the device can connect to Wiegand card reader via Wiegand communication.

Steps

iNote

This function should be supported by the device.

  1. Enter the Access Control module.
  2. On the navigation bar on the left, enter Advanced Function → More Parameters.
  3. Select an access control device in the device list and click Wiegand to enter the Wiegand Settings page.
  4. Set the switch to on to enable the Wiegand function for the device.

  5. Select the Wiegand channel No. and the communication mode from the drop-down list.

Hikvision DS-K1T671TM-3XF - iNote - 1

Note

If you set Communication Direction as Sending, you are required to set the Wiegand Mode as Wiegand 26 or Wiegand 34.

  1. Check Enable Wiegand to enable the Wiegand function.

  2. Click Save.

  3. The configured parameters will be applied to the device automatically.
    • After changing the communication direction, the device will reboot automatically.

9.8 Configure Linkage Actions for Access Control

You can configure different linkage actions for the event detected by the access control device. After that, linkage actions will be triggered once the event happens. This mechanism is used for notifying the security personnel the event, or triggering automatic access control in real time.

Two types of linkage actions are supported:

  • Client Actions: When the event is detected, it will trigger the actions on the client, such as the client making an audible warning..
  • Device Actions: When the event is detected, it will trigger the actions of a specific device, such as buzzing of a card reader and, opening/closing of a door, ..

9.8.1 Configure Client Actions for Access Event

Even if you are far away from an access point, you can still know what happens and how urgent the event is by configuring linked actions of access event on the client. You will be notified on the client once an event is triggered, so that you can response to the event instantly. You can also configure client actions of access points in a batch at a time.

Steps

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

The linkage actions here refer to the linkage of the client software's own actions such as audible warning, email linkage, etc.

  1. Click Event Management → Access Control Event.

The added access control devices will display in the device list.

  1. Select a resource (including device, alarm input, door/elevator, and card reader) from the device list.

The event types which the selected resource supports will display.

  1. Select the event(s) and click Edit Priority to define the priority for the event(s), which can be used to filter events in the Event Center.

  2. Set the linkage actions of the event.

1) Select the event(s) and click Edit Linkage to set the client actions when the events triggered.

Audible Warning

The client software gives an audible warning when alarm is triggered. You can select the alarm sound for audible warning.

Hikvision DS-K1T671TM-3XF - Audible Warning - 1

For setting the alarm sound, please refer to Set Alarm Sound in the user manual of client software..

Send Email

Send an email notification of the alarm information to one or more receivers.

For details about setting email parameters, refer to Set Email Parameters in the user manual of client software..

2) Click OK.

  1. Enable the event so that when the event is detected, en event will be sent to the client and the linkage actions will be triggered.
  2. Optional: Click Copy to... to copy the event settings to other access control device, alarm input, door, or card reader.

9.8.2 Configure Device Actions for Access Event

You can set the access control device's linkage actions for the access control device's triggered event. After that, when an event is triggered, it can trigger the alarm output, buzzer on access controller, and other actions.

Steps

Hikvision DS-K1T671TM-3XF - Steps - 1

The linkage actions should be supported by the device.

  1. Click Access Control → Linkage Configuration.
  2. Select the access control device from the list on the left.
  3. Click Add to add a new linkage.
  4. Select Event Linkage as the event source.
  5. select the event type and detailed event to set the linkage.
  6. In the Linkage Target area, set the property target to enable this action.

Buzzer on Controller

The audible warning of access control device will be triggered.

Capture

An event-related picture will be captured when the selected event happens.

Recording

An event-related picture will be captured when the selected event happens.

Hikvision DS-K1T671TM-3XF - Recording - 1

The device should support recording.

Buzzer on Reader

The audible warning of card reader will be triggered.

Alarm Output

The alarm output will be triggered for notification when the selected event happens

Alarm Input

Arm or disarm the alarm input.

Hikvision DS-K1T671TM-3XF - Alarm Input - 1

The device should support alarm input function.

Access Point

The door status of open, close, remain open, or remain close will be triggered.

Hikvision DS-K1T671TM-3XF - Access Point - 1

The target door and the source door cannot be the same one.

Audio Play

The audio prompt will be triggered. And the select audio index related audio content will be played according to the configured play mode.

7. Click Save.

  1. Optional: After adding the device linkage, you can do one or more of the followings:

Edit Linkage Settings Select the configured linkage settings in the device list and you can edit its event source parameters, including event source and linkage target.

Delete Linkage Settings Select the configured linkage settings in the device list and click Delete to delete it.

9.8.3 Configure Device Actions for Card Swiping

You enable access control device's linkage actions (such as disarming a zone and triggering audio prompt) for the swiping of a specific card, In this way, you can monitor the card holder's behaviors and whereabouts.

Steps

Hikvision DS-K1T671TM-3XF - Steps - 1

It should be supported by the device.

  1. Click Access Control → Linkage Configuration.
  2. Select the access control device from the list on the left.
  3. Click Add to add a new linkage.
  4. Select Card Linkage as the event source.
  5. Enter the card number or select the card from the drop-down list.
  6. Select the card reader where the card swipes.
  7. In the Linkage Target area, set the property target to enable this action.

Buzzer on Controller

The audible warning of access control device will be triggered.

Buzzer on Reader

The audible warning of card reader will be triggered.

Capture

An event-related picture will be captured when the selected event happens.

Recording

An event-related picture will be captured when the selected event happens.

Hikvision DS-K1T671TM-3XF - Recording - 1

The device should support recording.

Alarm Output

The alarm output will be triggered for notification.

Alarm Input

Arm or disarm the alarm input.

Hikvision DS-K1T671TM-3XF - Alarm Input - 1

The device should support alarm input function.

Access Point

The door status of open, close, remain open, or remain closed will be triggered.

Audio Play

The audio prompt will be triggered. And the select audio index related audio content will be played according to the configured play mode.

  1. Click Save.

When the card (configured in Step 5) swipes on the card reader (configured in Step 6), it can trigger the linked actions (configured in step 7).

  1. Optional: After adding the device linkage, you can do one or more of the followings:

Delete Linkage Settings Select the configured linkage settings in the device list and click Delete to delete it.

Edit Linkage Settings Select the configured linkage settings in the device list and you can edit its event source parameters, including event source and linkage target.

9.8.4 Configure Device Actions for Person ID

You can set the access control device's linkage actions for the specified person ID. When access control device detects the specified person ID, it can trigger the alarm output, buzzer on card reader, and other actions, so as to implement special monitoring on the specified person.

Steps

i Note

It should be supported by the device.

  1. Click Access Control → Linkage Configuration.
  2. Select the access control device from the list on the left.
  3. Click Add to add a new linkage.
  4. Select Person Linkage as the event source.
  5. Enter the employee number or select the person from the drop-down list.
  6. Select the card reader where the card swipes.
  7. In the Linkage Target area, set the property target to enable this action.

Buzzer on Controller

The audible warning of access control device will be triggered.

Buzzer on Reader

The audible warning of card reader will be triggered.

Capture

An event-related picture will be captured when the selected event happens.

Recording

An event-related picture will be captured when the selected event happens.

i Note

The device should support recording.

Alarm Output

The alarm output will be triggered for notification.

Alarm Input

Arm or disarm the alarm input.

i Note

The device should support zone function.

Access Point

The door status of open, close, remain open, or remain closed will be triggered.

Audio Play

The audio prompt will be triggered. And the select audio index related audio content will be played according to the configured play mode.

  1. Click Save.

  2. Optional: After adding the device linkage, you can do one or more of the followings:

Delete Linkage SettingsSelect the configured linkage settings in the device list and click Delete to delete it.
Edit Linkage SettingsSelect the configured linkage settings in the device list and you can edit its event source parameters, including event source and linkage target.

9.9 Door Control

In Monitoring module, you can view the real-time status of the doors managed by the added access control device. You can also control the doors such as open/close the door, or remain the door open/closed via the client remotely. Thereal-time access event are displayed in this module. You can view the access details and person details.

Hikvision DS-K1T671TM-3XF - Door Control - 1

Note

For the user with door control permission, the user can enter the Monitoring module and control the door. Or the icons used for control will not show. For setting the user permission, refer to Person Management.

9.9.1 Control Door Status

You can control the status for a single door, including opening door, closing door, remaining the door open, and remaining the door closed.

Steps

  1. Click Monitoring to enter the status monitoring page.

  2. Select an access point group on the upper-right corner.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

For managing the access point group, refer to Group Management in the user manual of the client software.

The doors in the selected access control group will display.

  1. Click a door icon to select a door, or press Ctrl and select multiple doors.

  2. Click the following buttons to control the door.

Open Door

When the door is locked, unlock it and it will be open for once. After the open duration, the door will be closed and locked again automatically.

Close Door

When the door is unlocked, lock it and it will be closed. The person who has the access authorization can access the door with credentials.

Remain Open

The door will be unlocked (no matter closed or open). All the persons can access the door with no credentials required.

Remain Closed

The door will be closed and locked. No person can access the door even if he/she has the authorized credentials, except the super users.

Capture

Capture a picture manually.

Hikvision DS-K1T671TM-3XF - Capture - 1

The Capture button is available when the device supports capture function. The picture is saved in the PC running the client. For setting the saving path, refer to Set File Saving Path in the user manual of the client software.

Result

The icon of the doors will change in real-time according to the operation if the operation is succeeded.

9.9.2 Check Real-Time Access Records

The access records will display in real time, including card swiping records, face recognitions records, comparison records, etc. You can view the person information and view the picture captured during access.

Steps

  1. Click Monitoring and select a group from the drop-down list on the upper-right corner.
    The access records triggered at the doors in the selected group will display in realtime. You can view the details of the records, including card No., person name, organization, event time, etc.
  2. Optional: Check the event type and event status so that these events will show in the list if the events are detected. The events of unchecked type or status will not be displayed in the list.
  3. Optional: Check Show Latest Event and the latest access record will be selected and displayed at the top of the record list.
  4. Optional: Click the event to view the accessed person details, including person pictures (captured picture and profile), person No., person name, organization, phone, contact address, etc.

Hikvision DS-K1T671TM-3XF - Steps - 1

You can double click the captured picture to enlarge it to view the details.

  1. Optional: Right click on the column name of the access event table to show or hide the column according to actual needs.

9.10 Event Center

The event information (for example, device offline) received by the client displays. In the Event Center, you can check the detailed information of the real-time and historical events, view the event linked video, handle the events, and so on.

Before the client can receive the event information from the device, you need to enable the events of the resource and arm the device first. For details, refer to Enable Receiving Event from Devices.

9.10.1 Enable Receiving Event from Devices

Before the client software can receive event notifications from the device, you need to arm the device first.

Steps

  1. Click ☐ → Tool → Device Arming Control to open Device Arming Control page.

All the added devices appear on this page.

  1. Optional: If there are to many devices, enter the key words in Filter filed to filter the device(s) you want.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

For the filtered devices, you can click Arm All or Disarm All to enable receiving event of these devices.

  1. In the Auto-Arming column, turn on the switch to enable auto-arming.

Device Arming Control Filter Arm All Disarm All Operation Device Arming Status ● Armed ● Armed ● Not Armed ● Not Armed ● Armed ● Armed ● Not Armed ● Armed ● Armed ● Not Armed ● Not Armed ● Not Armed ● Armed

Figure 9-13 Arm Device

After turned on, the device(s) will be armed. And notifications about the events triggered by the armed device(s) will be automatically sent to the client software in real-time.

9.10.2 View Real-Time Events

The real-time event information received by the client of the connected resources are displayed. You can check the real-time event information, including event source, event time, priority, etc.

Before You Start

Enable receiving events from devices before the client can receive event from the device, see Enable Receiving Event from Devices for details.

Steps

  1. Click Event Center → Real-time Event to enter the real-time event page and you can view the real-time events received by the client.

Event Time

For encoding device, event time is the client time when it receives the event. For other device types, event time is the time when the event is triggered.

Priority

Priority represents the emergency degree of the event.

  1. Filter the events.

Filter by Device Type and (or) Priority Select device type(s) and (or) priorities to filter events.

Filter by Keywords Enter the keywords to filter the events.

  1. Optional: Right-click the table header of the event list to customize the event related items to be displayed in the event list.
  2. Select an event in the event list to view the event details.
  3. Optional: Perform the following operations if necessary.

Handle Single Event Click Handle to enter the processing suggestion, and then click OK.

Hikvision DS-K1T671TM-3XF - Priority - 1

After an event is handled, the Handle button will become Add Remark. Click Add Remark to add more remarks for this handled event.

Handle Events in a Batch Select events that need to be processed, and then click Handle in Batch. Enter the processing suggestion, and then click OK.

Enable/Disable Alarm Click Audio On/Mute to enable/disable the audio of the event. Audio

Select the Latest Event Automatically Check Auto-Select Latest Event to select the latest event automatically and the event information details is displayed.

Clear Events Click Clear to clear the all the events in the event list.

Send EmailSelect an event and then clickSend Email, and the information details of this event will be sent by email.
NoteYou should configure the email parameters first, seeSet Email Parametersin the user manual of the client software for details.
Auto-Play VideoCheckAuto-Play Videoto automatically play video when displaying event details.
Enlarge Video or PictureDouble click the video image to view video in a larger window.Put the cursor on the picture, and clickno view picture in a larger window.
Download Captured PictureHover the cursor on the captured picture, and click the download icon on the lower right corner of the picture to download it to the local PC.
Download EventTriggered VideoHover the cursor on the recorded video, clickto download the video (30s before the event happens) triggered by the event.

9.10.3 Search Historical Events

You can search and view historical events by setting search conditions such as time, device type, and priority in the client. For the searched events, you can handle and export them.

Before You Start

Enable receiving events from devices before the client can receive event information from the device, see Enable Receiving Event from Devices for details.

Steps

  1. Click Event Center → Event Search to enter the event search page.
  2. Set the filter conditions to display the required events only.

Time

The time when the event starts.

Search by

Device

Search the events by device or the device's resource channels. If searched by device, you need to set the followings:

  • Include Sub-Node: Search the events of the device and all resource channels.
    • Device Type: Select the device from which you want to search events.

Group

Search the events by resource channels in the group.

iNote

  • For video intercom device, you need to select search scope: All and Locking Log.
  • For access control device, you can click Show More to set more conditions: status, event type, card reader type, person name, card No., and organization.

Priority

The priority including low, medium, high and uncategorized which indicates the emergency degree of the event.

Event Type

Select one or more event types to be searched from the drop-down list.

i Note

You can enter a key word (supports fuzzy search) in the search box to search the target event type(s).

Status

The handling status of the event.

Search by Keyword

Enter a key word (supports fuzzy search) to quickly search the target historical event(s). For example, you can enter a person's name to search the events related with this person.

  1. Click Search to search the events according the conditions you set.

Index Device Name Event Type Event Time Device Type Group Name Object Name Object Type Priority Event Details 1 access control Remote Arming 2020-03-16 10:50:51 Access Control Device access control Access Control Device Uncategoryed access control 2 access control Remote Login 2020-03-16 10:50:50 Access Control Device access control Access Control Device Uncategoryed access control Total 2 Minutes 50 Event Details Send Email Handle Help Picture Handling records No picture The handling record.

Figure 9-14 Search Historical Events

i Note

If you have selected Access Control as device type in Step 2, you can view extra information such as card No., temperature, and abnormal temperature (if device supports) in the searched events.

Handle In Back Export Export All Index | Event Type | Card No. | Temperature | Abnormal Temperature | Event Time | Wear Mask | 78 | Face Authentication Passed | 36.7°C | No | 2020-05-15 16:04:23 | Yes | 29 | Face Authentication Passed | 36.7°C | No | 2020-05-15 16:04:20 | Yes | 30 | Door Unlocked | - | - | 2020-05-15 16:04:10 | Unknown | 31 | Face Authentication Passed | 36.7°C | No | 2020-05-15 16:04:18 | Yes | 32 | Door Locked | - | - | 2020-05-15 16:04:17 | Unknown | Total SPX3 Preval(%) 70 + Event Details Send Email | Handle | Hlicle Handling records Person Name * Gender * Organization ID > ID Type * ID No * Phone No * Address * No handling record.

Figure 9-15 Search Historical Event

  1. Optional: Right click the table header of the event list to customize the event related items to be displayed in the event list.
  2. Select an event in the event list to view the event details.
  3. Optional: Perform one of the following operations.

Handle Single Event Handle single event: Select one event that needs to be handled, and then click Handle in the event information details page, and enter the handling suggestion.

Hikvision DS-K1T671TM-3XF - i Note - 2

After an event is handled, the Handle button will become Add Remark, click Add Remark to add more remarks for this handled event.

Batch Handle Events Handle events in a batch: Select the events which need to be handled, and then click Handle in Batch, and enter the handling suggestion.

Hikvision DS-K1T671TM-3XF - i Note - 3

After an event is handled, the Handle button will become Add Remark, click Add Remark to add more remarks for this handled event.

Auto-Play Video Check Auto-Play Video to automatically play video when displaying event details.

Enlarge Video or Picture - Double click the video image to view video in a larger window. - Put the cursor on the picture, and click 📄 to view picture in a larger window.

Send EmailSelect an event and then click Send Email, and the information details of this event will be sent by email.
NoteYou should configure the email parameters first, see Set Email Parameters in the user manual of the client software for details.
Export Event InformationClick Export to export the event log or event pictures to the local PC in CSV/Excel file. You can set the saving path manually.
Download Captured PictureHover the cursor on the captured picture, and click the download icon on the lower right corner of the picture to download it to the local PC.
Download Event Triggered VideoHover the cursor on the recorded video, click download the video (30s before the event happens) triggered by the event.

9.11 Time and Attendance

The Time and Attendance module provides multiple functionalities to track and monitor when employees start and stop work, and full control of employees working hours such as late arrivals, early departures, time taken on breaks and absenteeism.

Hikvision DS-K1T671TM-3XF - Time and Attendance - 1

Note

In this section, we introduce the configurations before you can getting the attendance reports. The access records recorded after these configurations will be calculated in the statistics.

9.11.1 Configure Attendance Parameters

You can configure the attendance parameters, including the general rule, overtime parameters, attendance check point, holiday, leave type, etc.

Set Weekend

The days of weekends may vary in different countries and regions. The client provides weekends definition function. You can select one or more days as the weekends according to actual requirements, and set different attendance rules for weekends from workdays.

Steps

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

The parameters configured here will be set as default for the newly added time period. It will not affect the existed one(s).

  1. Enter Time & Attendance module.
  2. Click Attendance Settings → General Rule.
  3. Select the day(s) as weekend, such as Saturday and Sunday.
  4. Click Save.

Configure Overtime Parameters

You can configure the overtime parameters for workday and weekend, including overtime level, work hour rate, attendance status for overtime, etc.

Steps

  1. Click Time & Attendance → Attendance Settings → Overtime.

  2. Set required information.

Overtime Level for Workday

When you work for a certain period after end-work time on workday, you will reach different overtime level: overtime level 1, overtime level 2 and overtime level 3. You can set different work hour rate for three overtime levels, respectively.

Work Hour Rate

Work Hour Rate is used to calculate work hours by multiplying it by overtime. When you work for a certain period after end-work time on workday, you will reach different overtime level. You can set different work hour rates (1-10, can be a decimal) for three overtime levels. For example, your valid overtime is one hour (in overtime level 1), and the work hour rate of overtime level 1 is set as 2, then the work hours in the period will be calculated as 2 hours.

Overtime Rule for Weekend

You can enable overtime rule for weekend and set calculation mode.

  1. Click Save.

Configure Attendance Check Point

You can set the card reader(s) of the access control device as the attendance check point(s), so that the authentication on the card readers will be recorded for attendance.

Before You Start

  • You have added access control device(s). For details, refer to Add Device.
  • You have enabled T&A Status. For details, refer to Add General Timetable .

By default, all card readers of the added access control devices are set as start/end-work check points. If you need to edit check point function of card reader(s), you can perform the following operations.

Steps

  1. Enter the Time & Attendance module.

  2. Click Attendance Settings → Attendance Check Point to enter the attendance check point settings page.

  3. Set Set All Card Readers as Check Points switch to off.
  4. Check the desired card reader(s) as attendance check point(s) in the list below.
  5. Set check point function as Start/End-Work, Start-Work or End-Work.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

When selecting Start-Work or End-Work, the attendance status uploaded from the device will be decided by the check point function you set here.

Start-Work

Attendance status uploaded from the device will all be calculated as Check-in.

End-Work

Attendance status uploaded from the device will all be calculated as Check-out.

Start/End-Work

Attendance status will be calculated as Check in/out according to the actual attendance status on the device.

6. Click Set as Check Point.

The configured attendance check point(s) are displayed on the right list.

7. Optional: After setting attendance check points, and perform the following operations.

Edit Check PointCheck one attendance check point, click Edit to edit its information including name, check point function, etc.Check two or more attendance check points, click Edit to batch edit check point function, enter remark, etc.
Delete Check PointCheck one or more check points, and click Delete to delete it/them.

Configure Holiday

You can add the holiday during which the check-in or check-out will not be recorded.

Add Regular Holiday

You can configure a holiday which will take effect annually on regular days during the effective period, such as New Year's Day, Independence Day, Christmas Day, etc.

Steps

  1. Enter the Time & Attendance module.
  2. Click Attendance Settings → Holiday to enter the Holiday Settings page.
  3. Check Regular Holiday as holiday type.
  4. Custom a name for the holiday.

  5. Set the first day of the holiday.

  6. Enter the number of the holiday days.
  7. Set the attendance status if the employee works on holiday.
  8. Optional: Check Repeat Annually to make this holiday setting effective every year.
  9. Click OK.

The added holiday will display in the holiday list and calendar.

If the date is selected as different holidays, it will be recorded as the first-added holiday.

  1. Optional: After adding the holiday, perform one of the following operations.

Edit Holiday Click to edit the holiday information.

Delete Holiday Select one or more added holidays, and click Delete to delete the holiday(s) from the holiday list.

Add Irregular Holiday

You can configure a holiday which will take effect annually on irregular days during the effective period, such as Bank Holiday.

Steps

  1. Enter the Time & Attendance module.
  2. Click Attendance Settings → Holiday to enter the Holiday Settings page.
  3. Click Add to open the Add Holiday page.
  4. Check Irregular Holiday as holiday type.
  5. Custom a name for the holiday.
  6. Set the start date of the holiday.

Example

If you want to set the forth Thursday in November, 2019 as the Thanksgiving Day holiday, you should select 2019, November, 4th, and Thursday from the four drop-down lists.

  1. Enter the number of the holiday days.
  2. Set the attendance status if the employee works on holiday.
  3. Optional: Check Repeat Annually to make this holiday setting effective every year
  4. Click OK.

The added holiday will display in the holiday list and calendar.

If the date is selected as different holidays, it will be recorded as the first-added holiday.

  1. Optional: After adding the holiday, perform one of the following operations.

Edit Holiday

Click to edit the holiday information.

Delete Holiday

Select one or more added holidays, and click Delete to delete the holiday(s) from the holiday list.

Configure Leave Type

You can customize the leave type (major leave type and minor leave type) according to actual needs. You can also edit or delete the leave type.

Steps

  1. Enter the Time & Attendance module.
  2. Click Attendance Settings → Leave Type to enter the Leave Type Settings page.
  3. Click Add on the left to add a major leave type.
  4. Optional: Perform one of the following operations for major leave type.

Edit Move the cursor over the major leave type and click to edit the major leave type.

Delete Select one major leave type and click Delete on the left to delete the major leave type.

  1. Click Add on the right to add a minor leave type.
  2. Optional: Perform one of the following operations for minor leave type.

Edit Move the cursor over the minor leave type and click to edit the minor leave type.

Delete Select one or multiple major leave types and click Delete on the right to delete the selected minor leave type(s).

Synchronize Authentication Record to Third-Party Database

The attendance data recorded on the client can be used by other system for calculation or some other operations. You can enable synchronization function to apply the authentication record from the client to the third-party database automatically.

Steps

  1. Enter Time & Attendance module.
  2. Click Attendance Settings → Third-Party Database.
  3. Set Apply to Database switch to on to enable synchronization function.
  4. Select database Type as SQLServer or MySQL.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

If you select MySQL, you should import the configuration file (libmysql.dll) from local PC.

  1. Set the other required parameters of the third-party database, including server IP address, port No., database name, user name and password.

Hikvision DS-K1T671TM-3XF - Note - 1

Note

The default port No. of the selected database type is displayed automatically. You can enter a number ranging from 1 to 65535 to customize the port No if needed.

  1. Set table parameters of database according to the actual configuration.

1) Enter the table name of the third-party database.

2) Set the mapped table fields between the client and the third-party database.

  1. Click Save to test whether database can be connected and save the settings for the successful connection.

- The attendance data will be written to the third-party database.

- During synchronization, if the client disconnects with the third-party database, the client will start reconnection every 30 mins. After being reconnected, the client will synchronize the data recorded during the disconnected time period to the third-party database.

Configure Break Time

You can add break time and set start time, end time, duration, calculation mode and other parameters for the break. The added breaktime can also be edited or deleted.

Steps

  1. Click Time & Attendance → Timetable → Break Time.

The added break time is displayed in the list.

  1. Click Break Time Settings to enter Break Time Settings window.

  2. Click Add.

  3. Enter a name for the break time.

  4. Set related parameters for the break time.

Start Time / End Time

Set the time when the break starts and ends.

No Earlier Than / No Later Than

Set the earliest swiping time for starting break and the latest swiping time for ending break.

Break Duration

The duration from start time to end time of the break.

Calculation

Auto Deduct

The break duration will be calculated according to the time you set.

Must Check

The break duration will be calculated and excluded from work hours according to actual check-in and check-out time.

Return from Break Early for

The actual check-in and check-out time does not exceed the break time, and can be marked as normal work or work overtime.

Return from Break Late for

The actual check-in and check-out time exceeds the break time, and can be marked as late, absent or early leave.

Calculated by

Each Check in/out: Each check-in time and check-out time is valid and the sum of all periods between adjacent check-in and check-out time will be recorded as the break time duration.

First In & Last Out: The first check-in time is recorded as start break time and the last check-out time is recorded as the end break time.

Enable T&A Status

Set Enable T&A Status switch to on to calculate the actual break time according to attendance status on the device.

Hikvision DS-K1T671TM-3XF - Enable T&amp;A Status - 1

Note

This function should be supported by the device.

Valid Authentication Interval

During the valid authentication interval, person swiping card for several times will only be calculated as once when calculating attendance data.

  1. Click Save to save the settings.
  2. Optional: Click Add to continue adding break time.

Configure Report Display

You can configure display contents displayed in the attendance report, such as the company name, logo, date format, time format, and mark.

Steps

  1. Enter Time & Attendance module.
  2. Click Attendance Statistics → Report Display.
  3. Set the display settings for attendance report.

Company Name

Enter a company name to display the name in the report.

Attendance Status Mark

Enter the mark and select the color. The related fields of attendance status in the report will display with the mark and color.

Weekend Mark

Enter the mark and select the color. The weekendfields in the report will display with the mark and color.

  1. Click Save.

9.11.2 Add General Timetable

On the timetable page, you can add general timetable for employees, which requires the fixed start-work time and end-work time. Also, you can set valid check-in/out time, allowable timetable for being late and leaving early.

Steps

  1. Click Time and Attendance → Timetable to enter the timetable settings page.
  2. Click Add to enter add timetable page.

Basic Settings Name New Period1 Timetable Type General Calculated by First In & Last Out Enable T&A Status Calculate Break Time into Attended Duration Attendance Time Start-Work Time 9:00 Valid Check-in Time 8:30 to 9:30 End-Work Time 18:00 Valid Check-out Time 17:30 to 18:30 Calculated as 5:40 min Late Allowable 10 min Early Leave Allowable 10 min Configuration Result Save Cancel

Figure 9-16 Add Timetable

  1. Create a name for the timetable.

Hikvision DS-K1T671TM-3XF - Steps - 2

Note

You can click the color icon beside the name to customize the color for the valid timetable on the time bar in the Configuration Result area.

  1. Select the timetable type as general.
  2. Select calculation method.

First In & Last Out

The first check-in time is recorded as start work time and the last check-out time is recorded as the end-work time.

Each Check-In/Out

Each check-in time and check-out time is valid and the sum of all periods between adjacent check-in and check-out time will be recorded as the valid working duration.

You need to set Valid Authentication Interval for this calculation method. For example, if the interval between card swiping of the same card is less than the set value, the card swiping is invalid.

  1. Optional: Set Enable T&A Status switch to on to calculate according to attendance status of the device.

Hikvision DS-K1T671TM-3XF - Each Check-In/Out - 1

Note

This function should be supported by the device.

  1. Optional: Enable Calculate Break Time into Attended Duration.

Hikvision DS-K1T671TM-3XF - Note - 1

Note

When enabled, break time will be calculated into the overall attendance duration. That is, the actual attendance duration equals to the overall attendance duration (includes break time).

  1. Set the related attendance time parameters as the following:

Start/End-Work Time

Set the start-work time and end-work-time.

Valid Check-in/out Time

On the time bar, adjust the yellow bar to set the timetable during which the check-in or check-out is valid.

Calculated as

Set the duration calculated as the actual work duration.

Late/Early Leave Allowable

Set the timetable for late or early leave.

  1. Set absence related parameters.

Check-In, Late for

You can set the late time duration for the employee who has checked in but is late for work. If the employee exceeds the required time period, his/her attendance data will be marked as absent.

Check-Out, Early Leave for

You can set the early leave time duration for the employee who checks out earlier than the normal leave time, and his/her attendance data will be marked as absent.

No Check-in

If the employee does not check in, his/her attendance data may be marked as absent or late.

No Check-Out

If the employee does not check out, his/her attendance data may be marked as absent or early leave.

  1. Click Save to add the timetable.

  2. Optional: Perform one or more following operations after adding timetable.

Edit Timetable Select a timetable from the list to edit related information.

Delete Timetable Select a timetable from the list and click Delete to delete it.

9.11.3 Add Shift

You can add shift for employees including setting shift period (day, week, month) and the effective attendance time. According to the actual requirements, you can adding multiple timetables in one shift for employees, which requires them to check in and check out for each timetable.

Before You Start

Add a timetable first. See Add General Timetable for details.

Steps

  1. Click Time & Attendance → Shift to enter shift settings page.
  2. Click Add to enter Add Shift page.
  3. Enter the name for shift.
  4. Select the shift period from the drop-down list.
  5. Select the added timetable and click on the time bar to apply the timetable.

Shift Name Default Shift Period 1 Week(s) Timetable 1 × Delete Clear Timetable 1 : 09:00 - 18:00 Time 00:00 02:00 04:00 06:00 08:00 10:00 12:00 14:00 15:00 18:00 20:00 22:00 24:00 Mon. Tue. Wed. Thu. Fri. Sat. Sun. Save Assign

Figure 9-17 Add Shift

Hikvision DS-K1T671TM-3XF - Steps - 2

Note

You can select more than one timetables. The start and end work time and the valid check-in and out time in different time tables can not be overlapped.

Shift Name: New Shift 1 Period: 1 Week(s) Timetable 1 Timetable 2 × Delete Clear Time 00:00 02:00 04:00 06:00 08:00 10:00 12:00 14:00 16:00 18:00 Timetable 1 : 09:00 - 18:00 Save Assign

Figure 9-18 Add Multiple Timetables

6. Click Save.

The added shift lists on the left panel of the page. At most 64 shifts can be added.

  1. Optional: Assign the shift to organization or person for a quick shift schedule.

1) Click Assign.
2) Select Organization or Person tab and check the desired organization(s) or person(s) box.
The selected organizations or persons will list on the right page.
3) Set the Expire Date for the shift schedule.
4) Set other parameters for the schedule.

Check-in Not Required

Persons in this schedule do not need to check-in when they come to work.

Check-out Not Required

Persons in this schedule do not need to check-out when they end work.

Scheduled on Holidays

On the holidays, this schedule is still effective and the persons needs to go to work according to the schedule.

Effective for Overtime

The persons' overtime will be recorded for this schedule.

5) Click Save to save the quick shift schedule.

9.11.4 Manage Shift Schedule

Shift work is an employment practice designed to make use of all 24 hours of the clock each day of the week. The practice typically sees the day divided into shifts, set periods of time during which different shifts perform their duties.

You can set department schedule, person schedule, and temporary schedule.

Set Department Schedule

You can set the shift schedule for one department, and all the persons in the department will be assigned with the shift schedule.

Before You Start

In Time & Attendance module, the department list is the same with the organization. You should add organization and persons in Person module first. See Person Management for details.

Steps

  1. Click Time & Attendance → Shift Schedule to enter the Shift Schedule Management page.
  2. Click Department Schedule to enter Department Schedule page.
  3. Select the department from the organization list on the left.

Hikvision DS-K1T671TM-3XF - Steps - 1

If Include Sub Organization is checked, when selecting the organization, its sub organizations are selected at the same time.

  1. Select the shift from the drop-down list.
  2. Optional: Enable Multiple Shift Schedules and select the effective time period(s) from the added timetables for the persons.

Hikvision DS-K1T671TM-3XF - Steps - 2

This is only available for shift with only one timetable.

Multiple Shift Schedules

It contains more than one timetables. The person can check in/out in any of the timetables and the attendance will be effective.

If the multiple shift schedules contains three timetables: 00:00 to 07:00, 08:00 to 15:00 and 16:00 to 23:00. The attendance of the person adopting this multiple shift schedules will be effective in any of the three timetables. If the person checks in at 07:50, it will apply the nearest timetable 08:00 to 15:00 to the person's attendance.

  1. Set the start date and end date.

  2. Set other parameters for the schedule.

Check-in Not Required

Persons in this schedule do not need to check-in when they come to work.

Check-out Not Required

Persons in this schedule do not need to check-out when they end work.

Scheduled on Holidays

On the holidays, this schedule is still effective and the persons needs to go to work according to the schedule.

Effective for Overtime

The persons' overtime will be recorded for this schedule.

Flexible Shift Schedule on Weekend

The person's attendance on the weekend will be recorded as overtime.

  1. Click Save.

Set Person Schedule

You can assign the shift schedule to one or more persons. You can also view and edit the person schedule details.

Before You Start

Add department and person in Person module. See Person Management for details.

Steps

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

The person schedule has the higher priority than department schedule.

  1. Click Time & Attendance → Shift Schedule to enter the Shift Schedule page.
  2. Click Person Schedule to enter Person Schedule page.
  3. Select the organization and select the person(s).
  4. Select the shift from the drop-down list.
  5. Optional: Enable Multiple Shift Schedules and select the effective time period(s) from the added timetables for the persons.

Hikvision DS-K1T671TM-3XF - Note - 1

Note

This is only available for shift with only one timetable.

Multiple Shift Schedules

It contains more than one timetables. The person can check in/out in any of the timetables and the attendance will be effective.

If the multiple shift schedules contains three timetables: 00:00 to 07:00, 08:00 to 15:00 and 16:00 to 23:00. The attendance of the person adopting this multiple shift schedules will be effective in any of the three timetables. If the person checks in at 07:50, it will apply the nearest timetable 08:00 to 15:00 to the person's attendance.

  1. Set the start date and end date.
  2. Set other parameters for the schedule.

Check-in Not Required

Persons in this schedule do not need to check-in when they come to work.

Check-out Not Required

Persons in this schedule do not need to check-out when they end work.

Scheduled on Holidays

On the holidays, this schedule is still effective and the persons needs to go to work according to the schedule.

Effective for Overtime

The persons' overtime will be recorded for this schedule.

Flexible Shift Schedule on Weekend

The person's attendance on the weekend will be recorded as overtime.

  1. Click Save.

Set Temporary Schedule

You can add a temporary schedule for the person and the person will be assigned with the shift schedule temporarily. You can also view and edit the temporary schedule details.

Before You Start

Add department and person in Person module. See Person Management for details.

Steps

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

The temporary schedule has higher priority than department schedule and person schedule.

  1. Click Time & Attendance → Shift Schedule to enter the Shift Schedule Management page.
  2. Click Temporary Schedule to enter Temporary Schedule page.
  3. Select the organization and select the person(s).
  4. Click one date or click and drag to select multiple dates for the temporary schedule.
  5. Select Workday or Non-Workday from drop-down list.

If Non-Workday is selected, you need to set the following parameters.

Calculated as

Select normal or overtime level to mark the attendance status for temporary schedule.

Timetable

Select a timetable from drop-down list.

Multiple Shift Schedule

It contains more than one timetables. The person can check in/out in any of the timetables and the attendance will be effective.

If the multiple shift schedules contains three timetables: 00:00 to 07:00, 08:00 to 15:00 and 16:00 to 23:00. The attendance of the person adopting this multiple shift schedules will be effective in any of the three timetables. If the person checks in at 07:50, it will apply the nearest timetable 08:00 to 15:00 to the person's attendance.

Rule

Set other rule for the schedule, such as Check-in Not Required, and Check-out Not Required. 6. Click Save.

Check Shift Schedule

You can check the shift schedule in calendar or list mode. You can also edit or delete the shift schedule.

Steps

  1. Click Time & Attendance → Shift Schedule to enter the Shift Schedule Management page.
  2. Select the organization and corresponding person(s).
  3. Click 📁 or 📁 to view the shift schedule in calendar or list mode.

Calendar

In calendar mode, you can view the shift schedule for each day in one month. You can click the temporary schedule for one day to edit or delete it.

List

In list mode, you can view the shift schedule details about one person or organization, such as shift name, type, effective period and so on. Check the shift schedule(s), and click Delete to delete the selected shift schedule(s).

9.11.5 Manually Correct Check-in/out Record

If the attendance status is not correct, you can manually correct the check-in or check out record. You can also edit, delete, and export the check-in or check-out record.

Before You Start

  • You should add organizations and persons in Person module. For details, refer to Person Management.
    • The person's attendance status is incorrect.

Steps

  1. Click Time & Attendance → Attendance Handling to enter attendance handling page.

  2. Click Correct Check-in/out to enter adding check-in/out correction page.

  3. Select one or more persons from left list for correction.
  4. Select the correction date.
  5. Select the correction type as Check-in, Check-out, Break-in, Break-out, etc., and set the correct time.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

You can click + to add multiple correction items. At most 8 check-in/out items can be added.

  1. Optional: Enter the remark information as desired.
  2. Click Save to save the above settings.
  3. Optional: After adding the check-in/out correction, perform one of the following operations.

View Click or to view the added attendance handling information in calendar or list mode.

Edit • In calendar mode, click ➕ Edit to edit the details.

- In list mode, double-click the related field in Date, Handling Type, Time, or Remark column to edit the details.

Hikvision DS-K1T671TM-3XF - Note - 1

Note

The edited check-in/out correction will take affect.

Delete In calendar mode, select one check-in/out correction, and click Delete to delete the selected item.

- In list mode, check one or more check-in/out corrections, and click Delete to delete the selected items.

Hikvision DS-K1T671TM-3XF - Note - 1

Note

The deleted check-in/out correction will no longer take affect.

Export In list mode, check one or more check-in/out corrections to export the attendance handling details (CSV file) to local PC.

9.11.6 Add Leave and Business Trip

You can add leave and business trip when the employee want to ask for leave or go on a business trip.

Before You Start

You should add organizations and persons in the Person module. For details, refer to Person Management.

Steps

  1. Click Time & Attendance → Attendance Handling to enter attendance handling page.
  2. Click Apply for Leave/Business Trip to enter adding the leave/business trip page.
  3. Select person from left list.

  4. Set the date(s) for your leave or business trip.

  5. Select the major leave type and minor leave type from the drop-down list.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

You can set the leave type in Attendance Settings. For details, refer to Configure Leave Type.

  1. Set the time for leave.
  2. Optional: Enter the remark information as desired.
  3. Click Save.
  4. Optional: After adding the leave and business trip, perform one of the following operations.

View

Click 📄 or 📋 to view the added attendance handling information in calendar or list mode.

Hikvision DS-K1T671TM-3XF - Note - 1

Note

In calendar mode, you need to click Calculate to get the attendance status of the person in one month.

Edit

  • In calendar mode, click the related label on date to edit the details.
  • In list mode, double-click the filed in Date, Handling Type, Time, or Remark column to edit the related information.

Delete Delete the selected items.

Export Export the attendance handling details to local PC.

Hikvision DS-K1T671TM-3XF - Note - 1

Note

The exported details are saved in CSV format.

9.11.7 Calculate Attendance Data

You need to calculate the attendance data before searching and viewing the overview of the attendance data, employees' detailed attendance data, employees' abnormal attendance data, the employees' overtime working data, and card swiping log.

Automatically Calculate Attendance Data

You can set a schedule so that the client can automatically calculate attendance data of the previous day at the time you configured every day.

Steps

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

  1. Enter the Time & Attendance module.

  2. Click Attendance Settings → General Rule.

  3. In the Auto-Calculate Attendance area, set the time that you want the client to calculate the data.
  4. Click Save.

The client will calculate the attendance data of the previous day from the time you have configured.

Manually Calculate Attendance Data

You can manually calculate attendance data by setting conditions including attendance time, department, attendance status, etc.

Steps

  1. Enter the Time & Attendance module.
  2. Click Attendance Statistics → Calculation.
  3. Set the start time and end time to define the attendance data range.
  4. Select the department from the drop-down list.
  5. Optional: Set other conditions, including name and person ID.
  6. Check attendance status (supports multi-selection).
  7. Click Calculate.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

Only the attendance data within three months can be calculated.

  1. Optional: Perform one of the following operations.
Correct Check-in/outSelect one person, click Correct Check-in/out to add check-in/out correction.
Select Items to DisplayClick in the upper right corner, or right click the table header of the attendance data list to customize the items to be displayed in the list.
Adjust Items SequenceClick one item (except Person ID) and move the mouse to customize the sequence of different items.
Generate ReportClick Report to generate the attendance report.

Hikvision DS-K1T671TM-3XF - Note - 1

Note

The report items will be displayed in the sequence you have set.

Export Report

Click Export to export attendance data (CSV file) to local PC.

Hikvision DS-K1T671TM-3XF - Export Report - 1

Note

The report items will be displayed in the sequence you have set.

9.11.8 Attendance Statistics

You can check the original attendance record, generate and export the attendance report based on the calculated attendance data.

Get an Overview of Employees' Attendance Data

You can search and view the employee's attendance data on the client, including attendance time, attendance status, check point, etc.

Before You Start

  • You should add organizations and persons in Person module and the persons have swiped cards. For details, refer to Person Management.
    • Calculate the attendance data.

i Note

  • The client will automatically calculate the previous day's attendance data at 1:00 am on the next day.
  • Keep the client running at 1:00 am or it cannot calculate the previous day's attendance data automatically. If not calculated automatically, you can calculate the attendance data manually. For details, refer to Manually Calculate Attendance Data .

Steps

  1. Enter the Time & Attendance module.
  2. Click Attendance Statistics → Attendance Record.
  3. Set the attendance start time and end time that you want to search.
  4. Set other search conditions, including department, name, and person ID.
  5. Select data source as All, Original Records on Device or Manually Handled Records.
  6. Optional: Click Get Events from Device to get the attendance data from the device.

iNote

There are two methods for getting attendance events from the device, including Online and Import File. For more details about operations, refer to .

  1. Optional: Click Reset to reset all the search conditions and edit the search conditions again.
  2. Click Search.
  3. Optional: For the displayed search results, perform one of the following operations.

Edit Attendance Status

Select one incorrect record, double click the field of Attendance Status column and select from the drop-down list to edit single piece of attendance status.

Check two or more incorrect records, click Edit Attendance Status on the upper left corner and select from the drop-down list to batch edit multiple pieces of attendance status.

Generate Report Click Report to generate the attendance report.

Export Report Click Export and select saving path to export the attendance report (CVS file) to the local PC.

Custom Export Click Custom Report and set conditions to export attendance records according to actual needs. For details, refer to .

Generate Instant Report

It supports to generate the a series of attendance reports manually to view the employees' attendance results.

Before You Start

Calculate the attendance data.

Hikvision DS-K1T671TM-3XF - Before You Start - 1

Note

You can calculate the attendance data manually, or set the schedule so that the client can calculate the data automatically every day. For details, refer to Calculate Attendance Data.

Steps

  1. Enter the Time & Attendance module.
  2. Click Attendance Statistics → Report.
  3. Select a report type.
  4. Select the department or person to view the attendance report.
  5. Set the start time and end time during which the attendance data will be displayed in the report.
  6. Click Report to generate the statistics report and open it.

Send Report Regularly

The client supports multiple report types and you can pre-define the report content and it can send the report automatically to the email address you configured.

Steps

  1. Enter the Time & Attendance module.
  2. Click Attendance Statistics → Regularly Send Report.
  3. Click Add to enter the add custom report page.
  4. Set the report content.

Report Name

Enter a name for the report.

Report Type

Select one report type and this report will be generated.

Report Time

The time to be selected may vary for different report type.

Person

Select the added person(s) whose attendance records will be generated for the report.

Hikvision DS-K1T671TM-3XF - Person - 1

You can view the selected person(s) in the right side of the Person area.

  1. Set the schedule to send the report to the email address(es) automatically.

Hikvision DS-K1T671TM-3XF - Person - 2

The Auto-Send Email function is enabled by default.

1) Set the Effective Period during which the client will send the report on the selected sending date(s).
2) Select the Sending Date(s) on which the client will send the report.
3) Set the Sending Time at which the client will send the report.

Example

If you set the effective period as 2018/3/10 to 2018/4/10, select Friday as the sending date, and set the sending time as 20:00:00, the client will send the report at 8 p.m. on Fridays during 2018/3/10 to 2018/4/10.

Hikvision DS-K1T671TM-3XF - Example - 1

Make sure the attendance records are calculated before the sending time. You can calculate the attendance data manually, or set the schedule so that the client can calculate the data automatically every day. For details, refer to Calculate Attendance Data.

4) Enter the receiver email address(es).

Hikvision DS-K1T671TM-3XF - Example - 2

Up to 5 email addresses can be added. You can click + to add a new email address.

5) Optional: Click Preview to view the email details.

  1. Click OK.

  2. Optional: After adding the custom report, you can do one or more of the followings:

Edit Report Select one added report and click Edit to edit its settings.

Delete Report Select one added report and click Delete to delete it.

Generate Report Select one added report and click Report to generate the report instantly and you can view the report details.

9.12 System Configuration

9.12.1 Set General Parameters

You can configure the frequently-used parameters, including log expired time, network performance, etc.

Steps

  1. Enter the System Configuration module.
  2. Click General tab to enter the General Settings page.
  3. Configure the general parameters.

Date Format / Time Format

The display style of date and time on related pages.

Log Expiry Date

The time for keeping the log files. Once exceeded, the files will be deleted.

Maximum Mode

Select Maximize or Full Screen as the maximum mode. Maximize mode can maximize the display and show the taskbar. Full Screen mode can display the client in full-screen mode.

Calendar Type

Select Gregorian Calendar or Nepali Calendar as the calendar type. If you select Nepali Calendar, the calender will switch to Nepali language and calculated time by Nepali calendar. You need to restart the client after switching the calendar.

Network Performance

Set the network conditions to Normal, Better or Best.

Save Pictures in Structure Data Format

You can enable Save Pictures in Structure Data Format to save structure data and delete registered picture.

Save Event for

Set the event deleting cycle to delete the old event.

Detect New Software Version

After enabled, the client can automatically detect the new software version and remind the user to upgrade the software.

Automatic Time Synchronization

Automatically synchronize the time of the added devices with the time of the PC running the client at a specified time point.

Auto-Upgrade Device

Set the upgrading mode after the new version of device are detected.

Disable

After enabled, the client will not download the firmware package and upgrade even if the client detects a new version of the client.

Prompt Me If Download and Upgrade

After the client detects a new version of the device, it will prompt the user whether to download the firmware package and upgrade.

Download and Prompt Me If Upgrade

After the client detects the new version of the device, it will download the firmware package automatically, and prompt the user whether to upgrade.

Download and Prompt Automatically

After the client detects the new version of the devices, it will download the firmware package and upgrade the new version automatically.

You need to set a schedule in the Upgrade Time field, during which the client upgrades the new version automatically.

  1. Click Save.

9.12.2 Set Picture Storage

The pictures, captured by the camera of video access control terminal, triggered by events, can be saved in the PC running the iVMS-4200 Service. You can set the picture storage location here manually.

Steps

  1. Enter the System Configuration module.
  2. Click Event Picture Storage.
  3. Set the Store Pictures in Server switch to on.

All the disks of the PC running the iVMS-4200 service will show.

  1. Select the disk to save the pictures.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

The default saving path is: Disk/iVMS-4200alarmPicture

  1. Click Save.

9.12.3 Set Alarm Sound

When the event is triggered, the client can give an audible warning to notify the security personnel. You can set the sound of the audible warning in this section.

Steps

  1. Open the System Configuration page.
  2. Click Alarm Sound tab to enter the Alarm Sound Settings page.

  3. Optional: Click ▪ and select the audio files from the local path for different events.

  4. Optional: Add customized alarm sound.

1) Click Add to add customized alarm sound.
2) Double click the Type field to customize the alarm sound name as desired.
3) Click and select the audio files from the local path for different alarms.

  1. Optional: Click 📋 for a testing of the audio file.
  2. Optional: Click ✗ in the Operation column to delete the custom sound.
  3. Click Save.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

The format of the audio file can only be WAV.

9.12.4 Set Access Control and Video Intercom Parameters

You can configure the access control and video intercom parameters according to actual needs.

Steps

  1. Open the System Configuration page.
  2. Click the Access Control & Video Intercom tab.
  3. Input the required information.

Ringtone

Click ... and select the audio file from the local path for the ringtone of indoor station. Optionally, you can click for a testing of the audio file.

Max. Ring Duration

Specify the seconds that the ring will last for at most. The maximum ring duration can be set from 15s to 60s.

Max. Speaking Duration with Indoor Station

Specify the seconds that the call with indoor station will last for at most. The maximum speaking duration between indoor station and the client can be set from 120s to 600s.

Max. Speaking Duration with Door Station

Specify the seconds that the call with door station will last for at most. The maximum speaking duration between door station and the client can be set from 90s to 120s.

Max. Speaking Duration with Access Control Device

Specify the seconds that the call with access control device will last for at most. The maximum speaking duration between access control device and the client can be set from 90s to 120s.

  1. Click Save.

9.12.5 Set File Saving Path

The pictures captured in Status Monitoring module are stored on the local PC. The saving path of these files can be set.

Steps

  1. Open the System Configuration page.
  2. Click File tab to enter the File Saving Path Settings page.
  3. Click ... and select a local path for the files.
  4. Click Save.

9.12.6 Set Email Parameters

When an event is triggered, if you can set Send Email as linkage action for this event, the client will an email to the recipients for notification. You need to set the email settings and specify target recipients in this section.

Steps

  1. Enter the System Configuration module.
  2. Click Email tab to enter the Email Settings interface.
  3. Enter the required information.

STMP Server

The STMP server IP address of host name (e.g., smtp.263xmail.com)

Encryption Type

You can check the radio to select Non-Encrypted, SSL, or STARTTLS.

Port

Enter the communication port used for SMTP. The port is 25 by default.

Sender Address

The email address of the sender.

Security Certificate (Optional)

If your email server requires authentication, check this checkbox to use authentication to log into the server and enter the login user name and password of your email account.

User Name

Enter the user name of the sender email address if Server Authentication is checked.

Password

Enter the password of the sender Email address if Server Authentication is checked.

Receiver 1 to 3

Enter the email address of the receiver. Up to 3 receivers can be set.

  1. Optional: Click Send Test Email to send an email to the receiver for test.

  2. Click Save.

9.13 Operation and Maintenance

You can perform maintaining operations in the menu to ensure a smooth and convenient usage of the client.

In the upper-right corner of the client, click ☐ → File → System → Tool, and perform the following operations.

Open Log File

You can open a log file saved in your local PC or log files of the client.

Import/Export Configuration File

You can import configuration files from local PC to the client if needed, and vice versa.

Auto Backup

Select day and time to backup configuration files and data in database, or restore the backed up data.

Skin

Change the skin of the client, including bright-color series and black-color series.

Batch Time Sync

Synchronize selected devices' time with your PC time.

Message Queue

After configuring email linkage, the triggered event(s) will be displayed here. Select an event and cancel sending the an email to the receiver.

9.14 Remote Configuration (Web)

Configure device parameters remotely.

9.14.1 View Device Information

View and set device name, view device type, serial No., version, relay number, and lock number.

Select a device from the Device for Management tab and click → System → Device Information to enter the Device Information page.

Hikvision DS-K1T671TM-3XF - View Device Information - 1

bar | Category | Value | |---|---| | Device Name | 100 | | Device Type | 80 | | Serial No. | 60 | | Firmware Version | 90 | | Web Version | 85 | | Hardware Version | 30 | | Local Zone Number | 4 | | Local Relay Number | 4 | | Lock Number | 4 | | Local RS-485 Number | 8 | Save

Figure 9-20 View Device Information

You can set the device name, view the device type, serial No., version, relay number, and lock number. Click Save to save the settings.

9.14.2 Change Device Password

You can change the device password.

Before You Start

Make sure the device is activated. For details, see Activation.

Steps

  1. On the Device for Management page, click → System → User to enter the User tab.
  2. Select a user and click Edit to enter the Edit page.
  3. Input the old password, create a new password, and confirm the new password.

Hikvision DS-K1T671TM-3XF - Steps - 1

Caution

The password strength of the device can be automatically checked. We highly recommend you change the password of your own choosing (using a minimum of 8 characters, including at least

three kinds of following categories: upper case letters, lower case letters, numbers, and special characters) in order to increase the security of your product. And we recommend you change your password regularly, especially in the high security system, changing the password monthly or weekly can better protect your product.

Proper configuration of all passwords and other security settings is the responsibility of the installer and/or end-user.

4. Click OK.

Result

The device password is changed. You should enter the new password on the Device for Management page to reconnect the device.

9.14.3 Time Management

Manage device's time zone, time synchronization, and DST parameters.

Time Zone and Time Synchronization

On the Device for Management page, select a device and click → System → Time to enter the Time tab.

You can select a time zone, set NTP parameters, or manually synchronize time.

Time Zone

Select a time zone from the drop-down list.

NTP

The device will synchronize time with NTP automatically. After you enable NTP, you should set the NTP server address, NTP port, and synchronization interval.

Manual Time Synchronization

After you enable Manual Time Synchronization, you can manually set the device time.

If you check Synchronize with Computer Time, the Set Time will display the current computer's time. At this time, uncheck Synchronize with Computer Time, and click 📋, you can edit the device time manually.

Click Save to save the settings.

DST

On the Device for Management page, click Remote Configuration → System → Time → DST to enter the DST tab.

Enable DST and you can edit the DST bias time, the DST start time, and end time.

Click Save.

9.14.4 System Maintenance

You can reboot the device remotely, restore the device to default settings, import configuration file, upgrade the device, etc.

Reboot

On the Device for Management page, click → System → System Maintenance to enter the System Maintenance tab.

Click Reboot and the device starts rebooting.

Restore Settings

On the Device for Management page, click Remote Configuration → System → System

Maintenance to enter the System Maintenance tab.

Restore Default

The parameters will be restored the default ones, excluding the IP address.

Restore Part of Settings

Restore all settings except communication settings and the remote user settings to default ones.

Restore All

All device parameters will be restored to the default ones. The device should be activated after restoring.

Import and Export

On the Device for Management page, click Remote Configuration → System → System Maintenance to enter the System Maintenance tab.

Import or export configuration file.

Import Configuration File

Import the configuration file from the local PC to the device.

Hikvision DS-K1T671TM-3XF - Import Configuration File - 1

Note

The configuration file contains the device parameters.

Export Configuration File

Export the configuration file from the device to the local PC.

Hikvision DS-K1T671TM-3XF - Export Configuration File - 1

Note

The configuration file contains the device parameters.

Upgrade

On the Device for Management page, click Remote Configuration → System → System

Maintenance to enter the System Maintenance tab.

Select a device type from the drop-down list, click Browse and select an upgrade file from the local computer, and click Upgrade.

Hikvision DS-K1T671TM-3XF - Upgrade - 1

Note

  • If you select Card reader as the device type, you should also select a card reader No. from the drop-down list.
  • The upgrade will lasts for about 2 min. Do not power off during the upgrading. After upgrading, the device will reboot automatically.

9.14.5 Configure RS-485 Parameters

You can set the RS-485 parameters including the baud rate, data bit, stop bit, parity type, communication mode, work mode, and connection mode.

Steps

  1. Click Maintenance and Management → Device to enter the device list.
  2. Click 📋 to enter the remote configuration page.
  3. Click System → RS-485 Settings to enter the Configuring the RS-485 Parameters tab.
  4. Select the serial No. of the port from the drop-down list to set the RS-485 parameters.
  5. Set the baud rate, data bit, the stop bit, parity, flow control, communication mode, working mode, and the connection mode from the drop-down list.
  6. Click Save and the configured parameters will be applied to the device automatically.

Hikvision DS-K1T671TM-3XF - Steps - 1

Note

After changing the working mode, the device will be rebooted. A prompt will be popped up after changing the working mode.

9.14.6 Security Mode Settings

Set the security mode for logging in the client software.

On the Device for Management page, click 📋 → System → Security to enter the Security Mode tab.

Select a security mode from the drop-down list, and click Save.

You can also enable SSH to get a more secure network.

Security Mode

High security level for user information verification when logging in the client software.

Compatible Mode

The user information verification is compatible with the old client software version when logging in.

9.14.7 Network Parameters Settings

Set device network parameters, including the NIC type, DHCP, and HTTP.

On the Device for Management page, click → Network → Network Parameters to enter the Network Parameters Settings tab.

NIC Type

Select a NIC type from the drop-down list. You can select either Self-adaptive, 10M, or 100M.

DHCP

If you disable the function, you should manually set the device's IPv4 address, IPv4 subnet mask, IPv4 default gateway, MTU, and port.

If you enable the function, the system will automatically assign IPv4 address, IPv4 subnet mask, IPv4 default gateway for the device.

HTTP

Set the HTTP port, DNS1 server address, and DNS2 server address.

9.14.8 Report Strategy Settings

You can set the center group for uploading the log via the EHome protocol.

On the Device for Management page, click → Network → Report Strategy to enter the Report Strategy Settings tab.

You can set the center group and the system will transfer logs via EHome protocol. Click Save to save the settings.

Center Group

Select a center group from the drop-down list.

Main Channel

The device will communicate with the center via the main channel.

Hikvision DS-K1T671TM-3XF - Main Channel - 1

Note

N1 refers to wired network.

9.14.9 Network Center Parameters Settings

You can set the notify center, center's IP address, the port No., the protocol (EHome), the EHome account user name, etc. to transmit data via EHome protocol.

On the Device for Management page, click → Network → Network Center Parameters to enter the Network Center Parameters Settings tab.

Select a center from the drop-down list.

After enabling the function, you can set the center's address type, IP address/domain name, port No., EHome user name, etc.

Click Save.

9.14.10 Configure SIP Parameters

Set the main station's IP address and the SIP server's IP address. After setting the parameters, you can communicate among the access control device, door station, indoor station, main station, and the platform.

Hikvision DS-K1T671TM-3XF - Configure SIP Parameters - 1

Note

Only the access control device and other devices or systems (such as door station, indoor station, main station, platform) are in the same IP segment, the two-way audio can be performed.

Click Maintenance and Management → Device to enter the device list.

Click 📋 to enter the remote configuration page.

Click Network → Linked Network Configuration and set the main station's IP address and SIP server's IP address.

Click Save.

9.14.11 Set Relay Parameters

Click Maintenance and Management → Device to enter the device list.

Click 📄 to enter the remote configuration page.

Click Alarm → Relay. Select a relay and click ⚙️ and set the relay name and output delay time.

Click OK to save the settings.

9.14.12 Set Access Control Parameters

Steps

  1. On the Device for Management page, click ➕ ➔ ➔ Others ➔ Access Control Parameters to enter the Access Control Parameters tab.

  2. Check the checkbox to enable the function.

Audio Prompt (Voice Prompt)

If you enable this function, the voice prompt is enabled in the device. You can hear the voice prompt when operating in the device.

Upload Pictures after Capturing

If you enable this function, the captured pictures will be sent to the client software.

Save Captured Pictures

If you enable this function, the captured pictures will be saved.

Temperature Measurement Only

When enabling the function, the device will not authenticate the permissions, but only take the temperature. When disabling the function, the device will authenticate the permissions and at the same time take the temperature.

Capture White Light Picture

When enabling the function, the pictures captured by the white light camera will be uploaded to the platform. If disabling the function, the device will only upload pictures captured by thermographic camera to the platform.

Door Not Open When Detecting Abnormal Temperature

When enabling the function, the door will not open when the detected temperature is higher or lower than the configured temperature threshold. By default, the temperature is enabled.

Must Wear Face Mask

After enabling this function, the authenticated person must wear a face mask, otherwise the authentication will be failed.

Over-Temperature Alarm

Edit the threshold according to actual situation. If the detected temperature is higher than the configured parameters, an alarm will be triggered. The value should be between 35.1 °C and 44.9 °C.

3. Click Save.

9.14.13 Set Face Recognition Terminal Parameters

Click Maintenance and Management → Device to enter the device list.

Press CTRL and click 📋 to enter the remote configuration page.

Click Other → Face Recognition Terminal Parameters and you can configure the device parameters.

Face Picture Database

Select Deep Learning as the face picture database.

Save Authenticating Face Picture

If enabled, the captured face picture when authenticating will be saved on the device.

CPU Card Reading

Select to read card No. or file.

Work Mode

Set the device work mode as Normal Mode. You should authenticate your credential for accessing.

ECO Mode

After enabling the ECO mode, the device will use the IR camera to authenticate faces in the low light or dark environment. And you can set the ECO mode threshold, ECO mode (1:N), and ECO mode (1:1).

ECO Mode (1:1)

Set the matching threshold when authenticating via ECO mode 1:1 matching mode. The larger the value, the smaller the false accept rate and the larger the false rejection rate.

ECO Mode (1:N)

Set the matching threshold when authenticating via ECO mode 1:N matching mode. The larger the value, the smaller the false accept rate and the larger the false rejection rate.

ECO Mode Threshold

When enabling the ECO mode, you can set the ECO mode's threshold. The larger the value, the easier the device entering the ECO mode. Available range: 0 to 8.

Click Save to save the settings.

9.14.14 Configure Face Picture Parameters

Steps

  1. Click Maintenance and Management → Device to enter the device list.
  2. Click 📋 to enter the remote configuration page.
  3. Click Other → Face Picture Parameters to enter the Configuring Face Picture Parameters page.

Pitch Angle

The maximum pitch angle when face authentication.

Yaw Angle

The maximum yaw angle when face authentication.

Margin (Left)

The distance percentage from the face left side to the left margin in the recognition area.

The actual distance percentage should be larger than the configured value when face picture authentication. Other percentages, distances, and angles should also meet their conditions.

Margin (Right)

The distance percentage from the face right side to the right margin in the recognition area.

The actual distance percentage should be larger than the configured value when face picture authentication. Other percentages, distances, and angles should also meet their conditions.

Margin (Top)

The distance percentage from the face top side to the top margin in the recognition area.

The actual distance percentage should be larger than the configured value when face picture authentication. Other percentages, distances, and angles should also meet their conditions.

Margin (Bottom)

The distance percentage from the face bottom side to the bottom margin in the recognition area.

The actual distance percentage should be larger than the configured value when face picture authentication. Other percentages, distances, and angles should also meet their conditions.

Pupillary Distance

The minimum resolution between two pupils when face recognition.

The actual resolution should be larger than the configured value.

Score

The device will score the captured picture according to the yaw angle, pitch angle, and pupillary distance. If the score is less than the configured value, face recognition will be failed.

You can set the face picture parameters when authenticating.

  1. Click Save.

9.14.15 Configure Supplement Light Parameters

You can turn on or off the supplement light. You can also adjust the supplement light brightness.

Steps

  1. Click Maintenance and Management → Device to enter the device list.
  2. Click 📋 to enter the remote configuration page.
  3. Click Other → Supplement Light Parameters to enter the Configuring Supplement Light Parameters page.
  4. Select a supplement light type from the drop-down list.
  5. Select a supplement light mode from the drop-down list.
  6. Optional: Set the supplement light brightness.
  7. Click Save to save the settings.

9.14.16 Set Device No.

Set the device type, community No., building No., floor No., and unit No., and room No.

Click Maintenance and Management → Device to enter the device list.

Click 📋 to enter the remote configuration page.

Click Other → No. Selings and Set the device type, community No., building No., floor No., and unit No., and No.

9.14.17 Configure Video and Audio Parameters

You can set the device camera's image quality, resolution and other parameters.

Steps

  1. Click Maintenance and Management → Device to enter the device list.

  2. Click 📋 to enter the remote configuration page.

  3. Click Image → Video & Audio to enter the settings page.
  4. Set the device camera's parameters, including the stream type, the bitrate type, the video quality, the frame rate, the audio encoding type, the video type, the bitrate, theresolution, and the I frame interval.
  5. Click Save.

9.14.18 Configure Volume Input or Output

Steps

  1. On the Device for Management page, click → Image → Audio Input or Output to enter Audio Input or Output tab.
  2. Move the block to adjust the device input and output volume.
  3. Click Save.

9.14.19 Operate Relay

Steps

  1. Click Maintenance and Management → Device to enter the device list.
  2. Click 📋 to enter the remote configuration page.
  3. Click Operation → Relay.
  4. Enable or disable the relay.

9.14.20 View Relay Status

Click Maintenance and Management → Device Management → Device to enter the device list.

Click 📋 to enter the remote configuration page.

Click Status → Relay and you can view the relay status.

Appendix A. Tips When Collecting/Comparing Face Picture

The position when collecting or comparing face picture is as below:

Recommended Height : 1.4 m to 1.9 m 1.4 m 0.5 m 1.4 m Too High Too Low 0.5 m Too Close 1.4 m 0.5 m 1.4 m 2 m Too Far

Expression

- Keep your expression naturally when collecting or comparing face pictures, just like the expression in the picture below.

Hikvision DS-K1T671TM-3XF - Expression - 1

  • Do not wear hat, sunglasses, or other accessories that can affect the facial recognition function.
  • Do not make your hair cover your eyes, ears, etc. and heavy makeup is not allowed.

Posture

In order to get a good quality and accurate face picture, position your face looking at the camera when collecting or comparing face pictures.

Correct ✓ Tilt ✗ Side ✗ Raise ✗ Bow ✗

Size

Make sure your face is in the middle of the collecting window.

Correct Too Close ✗ Too Far ✗

Appendix B. Tips for Installation Environment

1. Light Source Illumination Reference Value

Hikvision DS-K1T671TM-3XF - Light Source Illumination Reference Value - 1

Candle: 10Lux

Hikvision DS-K1T671TM-3XF - Light Source Illumination Reference Value - 2

Bulb: 100\~850Lux

Hikvision DS-K1T671TM-3XF - Light Source Illumination Reference Value - 3

Sunlight: More than 1200Lux

  1. Install the device at least 2 meters away from the light, and at least 3 meters away from the window or door.

3m

2m

  1. Avoid backlight, direct and indirect sunlight

Hikvision DS-K1T671TM-3XF - Light Source Illumination Reference Value - 6
Backlight

Hikvision DS-K1T671TM-3XF - Light Source Illumination Reference Value - 7
Direct Sunlight

Hikvision DS-K1T671TM-3XF - Light Source Illumination Reference Value - 8
Direct Sunlight

Hikvision DS-K1T671TM-3XF - Light Source Illumination Reference Value - 9
Indirect Sunlight

Hikvision DS-K1T671TM-3XF - Light Source Illumination Reference Value - 10
Close to Light

through Window through Window

Appendix C. Dimension
Hikvision DS-K1T671TM-3XF - Light Source Illumination Reference Value - 11

Appendix D. Communication Matrix and Device Command

Communication Matrix

Scan the following QR code to get the device communication matrix.

Note that the matrix contains all communication ports of Hikvision access control and video intercom devices.

HIKVISION

Figure D-1 QR Code of Communication Matrix

Device Command

Scan the following QR code to get the device common serial port commands.

Note that the command list contains all commonly used serial ports commands for all Hikvision access control and video intercom devices.

HIBKVISION

Figure D-2 Device Command

Hikvision DS-K1T671TM-3XF - Device Command - 2

See Far, Go Further

Table of contents Click a title to access it
Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : Hikvision

Model : DS-K1T671TM-3XF

Category : Access Control