Cambium Networks XE5-8 - Access Point

XE5-8 - Access Point Cambium Networks - Free user manual and instructions

Find the device manual for free XE5-8 Cambium Networks in PDF.

📄 288 pages English EN Download 💬 AI Question 10 questions ⚙️ Specs
Notice Cambium Networks XE5-8 - page 20
Pick your language and provide your email: we'll send you a specifically translated version.
Product Type Enterprise Wi-Fi Access Point
Brand Cambium Networks
Model XE5-8
Radio Configuration 8x8:8, 4x4:4, 4x4:4, 4x4:4 (quad-radio with SDR)
Supported Bands 2.4 GHz, 5 GHz, 6 GHz (software-defined)
Power Input 802.3bt PoE (60W max power draw, 32.9W min to boot)
PoE Out Port Not supported
Management Interfaces Web UI (HTTP/HTTPS), CLI (SSH/Telnet), SNMP, RADIUS
Wireless Standards 802.11a/b/g/n/ac/ax (Wi-Fi 6) with wave 2/ax
Security WPA2/WPA3, 802.1X, RADIUS, ePSK, MAC filtering, WIDS/WIPS
Channel Widths 2.4 GHz: 20/40 MHz; 5 GHz: 20/40/80/160 MHz; 6 GHz: 20/40/80/160 MHz
Placement Indoor or Outdoor (user-configurable)
LED Indicators Power, network/status (amber/green/blue)
Regulatory Compliance FCC Part 15, ISED, CE (RED), RoHS
Software Version Release 7.1.1 (at time of manual)

Frequently Asked Questions - XE5-8 Cambium Networks

How do I power up the Cambium XE5-8 Access Point?
The XE5-8 is powered via an 802.3bt PoE switch or injector connected to the Eth1/PoE-IN port. A DC power supply is not supported. Ensure the PoE source can deliver at least 60W for full operation.
What are the default login credentials for the XE5-8?
The default username and password are both admin. Access the device via its IP address (default 192.168.0.1) using a web browser.
Can the XE5-8 operate on the 6 GHz band?
Yes, the XE5-8 supports the 6 GHz band in certain countries. The band availability depends on regional regulations and the device SKU (FCC or ROW). You can configure the radio band in the Radio settings.
How do I configure VLANs for wireless clients?
VLAN assignment can be done per WLAN/SSID in the WLAN profile. The device also supports dynamic VLAN assignment via RADIUS using Filter-ID or Tunnel-Private-Group-Id attributes, as well as VLAN pooling.
Does the XE5-8 support PoE output to power another device?
No, the XE5-8 does not have a PoE out port. It only receives power via PoE in on the Eth1 port.
How can I enhance wireless client roaming?
Enable Fast Roaming protocols such as 802.11r (over-the-air) and OKC (Opportunistic Key Caching). Also enable 802.11k (Radio Resource Management) and 802.11v (BSS Transition Management) in the WLAN configuration.
What is the maximum transmit power of the XE5-8?
The transmit power is configurable from 4 dBm to 30 dBm per radio, subject to regulatory limits based on the country setting. The default is 'Auto' which sets the maximum allowed by the selected country.
How do I reset the XE5-8 to factory defaults?
Press and hold the RESET button on the device for at least 10 seconds. This will restore the device to factory default settings, including IP address 192.168.0.1 and admin credentials.
What management options are available for the XE5-8?
The device can be managed locally via web UI or CLI, or centrally through cnMaestro (Cloud or On-Premises) or XMS-Cloud. Zero-touch provisioning is supported on cnMaestro.
Can I use the XE5-8 in a mesh network?
Yes, the XE5-8 supports mesh mode (base, client, or recovery). Configure the WLAN with mesh enabled and set the appropriate role. The device can form mesh links with other Cambium APs.

User questions about XE5-8 Cambium Networks

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Access Point in PDF format for free! Find your manual XE5-8 - Cambium Networks and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. XE5-8 by Cambium Networks.

USER MANUAL XE5-8 Cambium Networks

natural_image Street view with surveillance cameras on a multi-lane elevated highway, no visible text or symbols

Cambium Networks XE5-8 - 1

Cambium Networks™

Cambium Networks XE5-8 - 2

natural_image Aerial night view of a town nestled in a valley with hills and a river in the background (no visible text or symbols)

Cambium Networks XE5-8 - 3

natural_image Young girl in blue shirt using tablet in classroom setting (no visible text or symbols)

Cambium Networks XE5-8 - 4

natural_image Overhead view of a group of people sitting around a table with laptops and tablets (no visible text or symbols)

Cambium Networks XE5-8 - 5

natural_image Desert landscape with a tall oil rig and surrounding hills under a dramatic cloudy sky (no text or symbols visible)

USER GUIDE

Enterprise Wi-Fi Access Point

Release 7.1.1

Cambium Networks XE5-8 - 6

natural_image Aerial view of a coastal industrial area with storage tanks, ships, and green fields under a blue sky (no visible text or symbols)

Cambium Networks XE5-8 - 7

natural_image Man in blue shirt standing at a desk with a laptop, working in a workshop with wooden furniture and no visible text or symbols.

Reservation of Rights

Cambium reserves the right to make changes to any products described herein to improve reliability, fund design, and reserves the right to revise this document and to make changes from time to time in core with no obligation to notify any person of revisions or changes. Cambium recommends reviewing the Car Networks website for the latest changes and updates to products. Cambium does not assume any liability out of the application or use of any product, software, or circuit described herein; neither does it convert under its patent rights or the rights of others. It is possible that this publication may contain references information about Cambium products (machines and programs), programming, or services that are not announced in your country. Such references or information must not be construed to mean that Cambium intends to announce such Cambium products, programming, or services in your country.

Copyrights

This document, Cambium products, ^rd Party3 software products described in this document may include or describe copyrighted Cambium and ^th Party3 supplied computer programs stored in semiconductor

memories or other media. Laws in the United States and other countries preserve for Cambium, its licer other ^rd Party supplied software certain exclusive rights for copyrighted material, including the exclusive right copy, reproduce in any form, distribute and make derivative works of the copyrighted material. Accordingly, copyrighted material of Cambium, its licensors, ^rd Party the software supplied material contained in the

Cambium products described in this document may not be copied, reproduced, reverse engineered, distribu merged or modified in any manner without the express written permission of Cambium. Furthermore, the purchase of Cambium products shall not be deemed to grant either directly or by implication, estoppel, otherwise, any license under the copyrights, patents or patent applications of Cambium or other 3rd Party supplied software, except for the normal non-exclusive, royalty free license to use that arises by operation in the sale of a product.

Restrictions

Software and documentation are copyrighted materials. Making unauthorized copies is prohibited by law. No of the software or documentation may be reproduced, transmitted, transcribed, stored in a retrieval system translated into any language or computer language, in any form or by any means, without prior written of Cambium.

License Agreements

The software described in this document is the property of Cambium and its licensors. It is furnished by license agreement only and may be used only in accordance with the terms of such an agreement.

High Risk Materials

Cambium and its supplier(s) specifically disclaim any express or implied warranty of fitness for any high-ri: activities or uses of its products including, but not limited to, the operation of nuclear facilities, aircraft navigation

or aircraft communication systems, air traffic control, life support, or weapons systems ("High Risk Use").

This product is not restricted in the EU. Any High Risk is unauthorized, is made at your own risk an responsible for any and all losses, damage or claims arising out of any High-Risk Use.

Contents 3

About This User Guide...12

Overview of Enterprise Wi-Fi AP products...12.

Intended audience...12.

Purpose ..12.

Feedback 12

Important regulatory information...13.

Complying with rules for the country of ...operation...13.

Related documents...14

New hardware platforms 15

Existing hardware platforms...15.

Premium feature list...16.

Quick Start - Device Access 18

Powering up the device 18

PoE switches (802.3af/802.3at/802.3bt) 18

PoE switches (802.3at) 18

PoE adapter 19

DC power supply 20

Accessing the device 20

Device access using default or fallback IP 21

Device access using zeroconf IP 22

Device access using DHCP IP address 23

LED status 23

Onboarding the Device 25

Overview 25

Device onboarding and provisioning 25

cnMaestro 25

XMS-Cloud 26

Configuring the System...27

Basic 27

Power over Ethernet (PoE) in 29

Power over Ethernet (PoE) Out port 32

Link Layer Discovery Protocol (LLDP) 32

Management 34

Administrator Access 34

HTTPS Proxy server configuration 35

Time settings 36

Event logging 37

SNMP 37

Configuring the Radio 39

Overview 39

Configuring Radio parameters 39

Basic 39

Software-Defined Radio (SDR) capabilities 48

Enhanced Roaming 52

BSS Coloring 52

Target Wake Time (TWT) 52

Receive sensitivity configuration 53

Multicast-snooping and Multicast-to-Unicast conversion 53

Boot loop detection 54

Auto-RF 55

Overview 55

Dynamic Channel 55

Dynamic Power 56

Auto-RF behavior on device turn on 56

Auto-RF Rx Sensitivity 57

Configuring Dynamic Channel 57

Configuring Dynamic Power 59

Radio Configuration 60

Configuring the Wireless LAN 62

Overview 62

Configuring the WLAN parameters 62

Basic 63

WLAN VLAN allowed list 77

ICMPv6 Router advertisement (RA) unicast conversion 77

802.11k/v 77

RADIUS server 78

Guest Access 82

Usage Limits 94

Scheduled Access 95

Access 97

Passpoint 100

RADIUS attributes 102

Enterprise PSK (ePSK) 104

Configuring ePSKs 104

ePSK registration for WPA3 clients 107

Creating a Personal Wi-Fi ePSK 116

RADIUS-based ePSK Premium feature 117

Configuring RADIUS-based ePSK 117

Groupwise Transient Key (GTK) per VLAN 119

Dynamic ARP Inspection 119

Configuring the Network 120

Overview 120

Configuring Network parameters...120.

IPv4 network parameters...120

Routes 126

IPv6 network parameters...127

General network parameters...130.

Ethernet Ports...131

DHCP 134

Tunnel 135

Point-to-Point Protocol over Ethernet (PPPoE) 138.

VLAN Pool 139

Wireless Wide Area Network (WWAN) 140

Configuring Access Control...142

Enabling Access Control Policy 142

User Group Policy...143

Device Policy 144

Managing Filters 146

Overview 146

Filter list 146

Filters 146

Configuring filter CLI 147

Device class filter 151

Wi-Fi Calling support 152

Air cleaner 152

Application control Premium feature 154

Deep Packet Inspection (DPI) 155

Custom Applications X 168

WIDS/WIPSPremium feature 171

Wireless Intrusion Detection Systems (WIDS) 171

Wireless flood detection 171

Neighbor AP detection 172

Rogue APs 172

Honeypot APs 172

Ad Hoc network detection 172

Wired Devices 173

Configuring WIDS 173

Wireless Intrusion Prevention System (WIPS) 174

Configuring Services 176

Overview 176

Configuring services 176

Lightweight Directory Access Protocol (LDAP) 176

NAT Logging 177

User Groups Premium feature 178

Real-Time Location System (RTLS) 180

Speed Test 184

DHCP Option-82 185

Bonjour Gateway 186

Link Aggregation Control Protocol (LACP) 188

Operations 190

Overview 190

Firmware upgrade 190

LED Test flashing pattern 191

Troubleshoot 192

Status 192

Downloading tech support file 193

Logging 193

Debug Logs...193

Radio Frequency (RF) ... 194.

Wi-Fi Analyzer...194

Packet capture...196

Performance ..198.

Network Connectivity....198

Remote CLI 200

Flash LEDs...201

XIRCON tool support 201

XIRCON tool support for Linux 1.0.0.40...202

Management Access...203

Local authentication 203

Device configuration...203

SSH Key authentication 203

Device configuration...204

SSH Key generation 204

RADIUS authentication 206

Device configuration 207

Mesh 208

Deployment scenarios 208

Mesh configurable parameters 210

Order of Mesh profile configuration 212

Mesh Auto Detect Backhaul 219

Scenario 1 219

Scenario 2 220

Scenario 3 220

Mesh Muti-Hop 224

Mesh Roaming 225

Mesh Base configuration 225

Mesh Client configuration 226

Mesh link-Sample configuration 227

VLAN 1 as the management interface 227

Non-VLAN 1 as the management interface 231

Typical use-cases 235

Additional mesh topology supported 236

Guest Access Portal - Internal 237

Introduction 237

Configurable parameters 238

Access policy 239

Splash page 239

Redirect parameters 240

Success message 241

Timeout 241

Whitelist 241

Configuration examples 241

Guest Access Portal - External 243

Introduction 243

Configurable parameters 243

Access policy 244

WISPr 244

External portal post through cnMaestro 244

External portal type 244

Redirect parameters 244

Success message 245

Timeout 245

Whitelist 245

Configuration examples 245

Guest Access - cnMaestro 247

Auto VLAN 248

Device Recovery Methods 249

Factory reset via 'RESET' button 249

Boot partition change via power...cycle...249

Disable factory Reset Button 250

Command-Line Interface (CLI) 251

Show commands...251

Service commands...254

Service show 254

Service system...255

cnMaestro X Assurance...257

MarketApps 258

Target audience 258

Benefits 258

AFC 259

Supported AP firmware version 259

Supported cnMaestro version 259

Supported countries 259

AFC 6 GHz frequency range support 259

Prerequisites for AFC Operation 260

AFC Operation 260

AFC information in dashboard 262

GPS configuration CLIs 263

AFC Troubleshooting 263

Verify GPS information received by the AP 263

Verify AFC server connection status and information 264

AFC events...264

Glossary 265

Appendix 267

Supported RADIUS Attributes...268

WISPr VSAs (Vendor ID: 14122)....268.

Cambium VSAs (Vendor ID: 17713) ... 269

Standard RADIUS attributes...272

RADIUS attributes in authentication and accounting packets with WPA2-Enterprise security 274

Supported CoA messages...277

Supported DFS channels...278

Supported 6 GHz countries...279.

Priority order for parameters...282

Reasons for AP restarting...282

Best practices for wireless clients seamless roaming across APs 283

External network recommendations 283

AP WLAN profile configuration recommendations 284

AP group configuration recommendations 286

Cambium Networks 288

This section describes the following topics:

• Overview of Enterprise Wi-Fi AP products
- Intended audience
- Purpose
- Feedback
• Important regulatory information
- Related documents
• New hardware platforms
• Existing hardware platforms
- Premium feature list

Overview of Enterprise Wi-Fi AP products

This User Guide describes the features supported by Enterprise Wi-Fi Access Point (AP), and provides detailed instructions for setting up and configuring Enterprise Wi-Fi AP.

Intended audience

This guide is intended for use by the system designer, system installer, and system administrator.

Purpose

Cambium Network's Enterprise Wi-Fi AP documents are intended to instruct and assist personnel in operation, installation, and maintenance of Cambium's equipment and ancillary devices. It is recommended that all personnel engaged in such activities be properly trained.

Cambium disclaims all liability whatsoever, implied or expressed, for any risk of damage, loss, or re-system performance arising directly or indirectly out of the failure of the customer, or anyone acting customer's behalf, to abide by the instructions, system parameters, or recommendations made in this document.

Feedback

We appreciate feedback from the users of our documents. This includes feedback on the structure, accuracy,

or completeness of our documents. To provide feedback, visit our support website: https://support.cambiumnetworks.com.

Important regulatory information

Complying with rules for the country of operation

USA specific information

Cambium Networks XE5-8 - Complying with rules for the country of operation - 1

Caution

This device complies with Part 15 of the Federal Communications Commission (FCC) Rules Operation is subject to the following two conditions:

• This device may not cause harmful interference, and
- This device must accept any interference received, including interference that may cause undesired operation of the device.

Cambium Networks XE5-8 - Caution - 1

Note

This equipment has been tested and found to comply with the limits for a Class B di pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interferone or more of the following measures:

  • Reorient or relocate the receiving antenna.
  • Increase the separation between the equipment and receiver.
  • Connect the equipment into an outlet on a circuit different from that to which the is connected.
  • Consult the dealer or an experienced radio/TV technician for help.

Canada specific information

Cambium Networks XE5-8 - Canada specific information - 1

Caution

This device complies with Innovation, Science and Economic Development Canada (ISEDC) licenseexempt RSSs. Operation is subject to the following two conditions:

• This device may not cause harmful interference, and

- This device must accept any interference received, including interference that may cause undesired operation of the device.

Europe specific information

Cambium Networks Enterprise Wi-Fi AP products are compliant with applicable European Directives required for CE marking:

• 2014/53/EU of the European Parliament and of the Council of 16 April 2014 on the harmonizati laws of the Member States relating to the making available on the market of radio equipment repealing Directive 1999/5/EC; Radio Equipment Directive (RED).
• 2011/65/EU of the European Parliament and of the Council of 8 June 2011 on the restriction of certain hazardous substances in electrical and electronic equipment (RoHS Directive).
- Cambium Networks complies with the European Regulation 2023/988 of 10 May 2023 on General Product Safety. EU Authorized Representative: Cambium Networks Europe B.V., Muiderstraat 1, 1011P Amsterdam, Netherlands. Contact Information: GPSR@cambiumnetworks.com.

Table 1 provides details of related documents for Enterprise Wi-Fi AP.
Table 1 Related documents

Document Name Location
Enterprise Wi-Fi AP product details https://www.cambiumnetworks.com/products/wifi/
Enterprise Wi-Fi AP Hardware and Installations//support.cambiumnetworks.com/filesGuide
Enterprise Wi-Fi AP User Guide (This document) https://support.cambiumnetworks.com/files
Enterprise Wi-Fi AP Release Notes https://support.cambiumnetworks.com/files
Enterprise Wi-Fi AP Command-Line Interfachttps://support.cambiumnetworks.com/filesReference Guide
Software Resources https://support.cambiumnetworks.com/files
Community http://community.cambiumnetworks.com/
Support https://www.cambiumnetworks.com/support/contact-support/
Warranty https://www.cambiumnetworks.com/support/warranty/
Feedback support@cambiumnetworks.com

New hardware platforms

Table 2 lists the new hardware platforms introduced in Enterprise Wi-Fi Access Points.

Table 2 New hardware platforms

Hardware PlatformDescription SupportedSoftware Version
X7-53X 2x2:2, 4x4:4 802.11b/g/n/ac/ax/be Dual-Radio Indoor Wi-Fi 7 Access RePoint 7.1.1 and above
X7-55X 2x2:2, 4x4:4, 4x4:4 802.11b/g/n/ac/ax/be Tri-Radio Indoor Wi-Fi 7 Point 2+4+4: third radio SDR 5/6GHz, 5GbE, with IoT radioRelease 7.1.1 and above

Existing hardware platforms

Table 3 lists the existing hardware platforms in Enterprise Wi-Fi Access Points:

Cambium Networks XE5-8 - Existing hardware platforms - 1

Warning

Release 6.x is no longer supported on Wi-Fi 5 APs. It was provided for the Wi-Fi 5 BETA release only. Any issues on these APs running release 6.x will not be supported Cambium Support team.

Table 3 Existing hardware platforms

Hardware PlatformDescription Supported Software Version
XV3-88x8:8, 4x4:4 802.11a/b/g/n/ac wave 2/ax Tri-Radio Access PointRelease 6.0 and above
XV2-22x2:2, 2x2:2 802.11a/b/g/n/ac wave 2/ax Dual-Radio Indoor Access PointRelease 6.1 and above
XV2-2T0 2x2:2, 2x2:2 802.11a/b/g/n/ac wave 2/ax Dual-Radio Outdoor Access Point, Omni, PoE outRelease 6.3.5.1 and above
XV2-2T1 Outdoor Wi-Fi 6 Access point, 2x2 Sector antenna band 802.11ax 2x2, BLE, 2.5GbERelease 6.4.1 and above
XV2-22H 2x2:2, 2x2:2 802.11a/b/g/n/ac wave 2/ax Dual-Radio Indoor Wi-Fi 6 Wall-Plate Access PointRelease 6.5 and above
XV2-21X 2x2:2, 2x2:2 802.11a/b/g/n/ac wave 2/ax Dual-Radio Indoor Wi-Fi 6 Access PointRelease 6.5 and above
XV2-23T 2x2:2, 2x2:2 802.11a/b/g/n/ac wave 2/ax Dual-Radio Outdoor Wi-Fi 6 Access PointRelease 6.5 and above
XE3-4 4x4:4; 2x2:2; 2x2:2 802.11a/b/g/n/ac wave 2/ax Tri-Rad Indoor Wi-Fi 6e Access PointRelease 6.4 and above
XE3-4TN 4x4:4, 2x2:2, 2x2:2 802.11b/g/n/ac wave 2/ax Tri-Rad Outdoor Wi-Fi 6e Access pointRadio Release 6.5.1 and above• Release 6.6.2 and above to support 6 GHz LPINote: Low Power Indoors (LPI) is for indoor use only
XE5-8 8x8:8, 4x4:4, 4x4:4, 4x4:4 802.11a/b/g/n/ac wave 2/ax Band AP with multi-radio SDRRelease 6.4.1 and above
X7-35X 2x2:2 802.11b/g/n/ac/ax/be Tri-Radio Indoor Wi-Fi 7 Access Point with IoT radioRelease 7.0 and above

Premium feature list

Enterprise Wi-Fi AP firmware support certain advanced features that are available only through a pai subscription to cnMaestro X. These features are identified with the label Premium feature in the

documentation. End users can also access these features without a management subscription on a basis and for a limited time. As Cambium Networks releases new versions, restrictions will be enforced the use of these premium features only in conjunction with a current cnMaestro X subscription. If does not have a current subscription at that time, the APs will stop enabling configurations, including premium features.

Table 4 Premium feature list

Feature Name Release Details
Wireless Intrusion Detection Systems (WIDS)Release 6.4.2
RADIUS-based ePSK Release 6.4
Stanley AeroScout Location Engine Release 6.3
User Groups Release 6.2
Advanced Filters (QoS, DSCP, Schedule, and Rate limit) Release 6.0
Application Control Release 6.0

Quick Start - Device Access

This chapter describes the following topics:

• Powering up the device
- Accessing the device
- LED status

Powering up the device

This section includes the following topics:

• PoE switches (802.3af/802.3at/802.3bt)
• PoE switches (802.3af/802.3at/802.3bt)
- PoE adapter
• DC power supply

Enterprise Wi-Fi AP product family can be powered using an Ethernet PoE Switch or a PoE midsp. Note that some APs can be powered by 802.3af, while others may require 802.3at or 802.3bt. And some APs can be powered with an external power supply. Refer to the related product datasheet determine the options available.

PoE switches (802.3af/802.3at/802.3bt)

PoE switches (802.3at)

Enterprise Wi-Fi APs negotiate the power via the LLDP mechanism. Figure 1 represents the Enterprise Wi-Fi AP Eth1 port connecting to a switch (PoE PSE Port).

Figure 1 Installation of Enterprise Wi-Fi AP to PSE port
Eth1

Table 5 provides detailed information on the AP modules that are enabled based on power negotiated via LLDP.
Table 5 Power management policy

PlatformIEEE 802.3af(12.95W @ PD)IEEE 802.3at(25.5W @PD)IEEE 802.3btClass - 0/1/2/3/(40W @ PD)IEEE 802.3bClass - 5/6 (5@ PD)IEEE 802.3b ClassW 7/8 (64W @ PD)
XV3-8√ √
XV2-2
XV2-2T0√ √√ √
XV2-2T1√ √√ √
XV2-22H
XV2-21X
XV2-23T
XE3-4√ √
XE3-4TN√ √√ √ √
XE5-8√ √√ √
X7-35X

PoE adapter

To power up the device using a PoE adapter, perform the following steps:

  1. Connect the Ethernet cable from the Eth1/PoE-IN port of the device to the 5 Gigabit Data + the PoE adapter.
  2. Connect an Ethernet cable from your LAN or computer to the 5 Gigabit Data port of the Po

Figure 2 Installation of Enterprise Wi-Fi AP to a PoE adapter
5 Gigabit Data 5 Gigabit Data power

  1. Connect the power cord to the adapter, and then plug the power cord into a power outlet Figure 3. Once powered ON, the Power LED should illuminate continuously on the PoE adapter.

Figure 3 Connecting PoE adapter to a power outlet
Diagram showing connections between a device with power and switch, labeled with 'DC-DC' and 'DC+DC+DC'

DC power supply

The Enterprise Wi-Fi AP XV3-8 has an option to power via a DC power adapter through the bar. If the device is connected to both the DC power adapter and the PoE adapter, then the DC po takes precedence.

Accessing the device

This section includes the following topics:

• Device access using default or fallback IP
• Device access using zeroconf IP
• Device access using DHCP IP address

Once the device is powered up, ensure it is operational by checking the LED status. The power AP should turn green, which indicates that the device is ready for access.

Device access using default or fallback IP

To configure the computer to access the device using the default or fallback IP, perform the follo

  1. Open Local Area Connection Properties by performing one of the following steps:

  2. In computers running Windows 7 operating system, go to Control Panel > Network and Internet > Network Connections > Local Area Connection > Properties (in the Local Area Connection Status window).

  3. In computers running Windows 10 operating system, go to Control Panel > Network and Internet > Network and Sharing Center > Local Area Connection > Properties (in the Local Area Connection Status window).

Local Area Connection Properties Networking Authentication Sharing Connect using: Intel(R) Ethernet Connection I217-LM Configure... This connection uses the following items: ✓ Client for Microsoft Networks ✓ Juniper Network Service ✓ QoS Packet Scheduler ✓ File and Printer Sharing for Microsoft Networks ✓ Internet Protocol Version 6 (TCP/IPv6) ✓ Internet Protocol Version 4 (TCP/IPv4) ✓ Link-Layer Topology Discovery Mapper I/O Driver ✓ Link-Layer Topology Discovery Responder Install... Uninstall Properties Description Allows your computer to access resources on a Microsoft network.

The AP obtains its IP address from a DHCP server. A default IP address of 192.168.0.1/24 is address is not obtained from the DHCP server.

  1. Select Internet Protocol Version 4 (TCP/IPv4) and click Properties.

The Internet Protocol Version 4 (TCP/IPv4) Properties dialog box appears, as shown below:

Internet Protocol Version 4 (TCP/IPv4) Properties General You can get IP settings assigned automatically if your network supports this capability. Otherwise, you need to ask your network administrator for the appropriate IP settings. Obtain an IP address automatically Use the following IP address: IP address: 192 . 168 . 0 . 100 Subnet mask: 255 . 255 . 255 . 0 Default gateway: . Obtain DNS server address automatically Use the following DNS server addresses: Preferred DNS server: . . . . | Alternate DNS server: . . . . Validate settings upon exit Advanced... OK Cancel

  1. In the Use the following IP address section, ensure that an appropriate IP address and a subnet address are provided.
  2. Click OK.
  3. Ensure that your computer is set up to communicate with the required range of IP addresses.
  4. Open a web browser and type the URL - http://192.168.0.1 - to access the device UI. The Si appears.
  5. Type an appropriate username and password.

  6. Default username: admin

  7. Default password: admin

  8. Click Sign In.

Device access using zeroconf IP

To configure the computer to access the device using the zeroconf IP, complete the following step

  1. Convert the last two bytes of ESN of the device to decimal. If ESN is 58:C1:CC:DD:AA:BB, last of this ESN is AA:BB. Decimal equivalent of AA:BB is 170:187. Zeroconf IP of the device with 58:C1:CC:DD:AA:BB is 169.254.170.187.

  2. Configure Management PC with 169.254.100.100/16, as described below:

Internet Protocol Version 4 (TCP/IPv4) Properties General You can get IP settings assigned automatically if your network supports this capability. Otherwise, you need to ask your network administrator for the appropriate IP settings. Obtain an IP address automatically Use the following IP address: IP address: 169 . 254 . 100 . 100 Subnet mask: 255 . 255 . 0 | . 0 Default gateway: . Obtain DNS server address automatically Use the following DNS server addresses: Preferred DNS server: . Alternate DNS server: . Validate settings upon exit Advanced... OK Cancel

  1. Access the device UI using http://169.254.170.187 with default credentials as below:

  2. Username: admin

  3. Password: admin

Device access using DHCP IP address

To access the device using DHCP IP address, follow the below steps:

  1. Plugin the device to the network.
  2. Obtain the IP address of the device from the system administrator.
  3. Access the device UI using http:// and default credentials, as listed below:

  4. Username: admin

  5. Password: admin

LED status

The Enterprise Wi-Fi AP features a single-color LED. The power LED glows amber when AP is turni turns green once the AP has successfully turned on. The network or status LED glows green if t connection to XMS or cnMaestro controller or manager is down. It turns blue once the AP is con successfully to XMS or cnMaestro.

Table 6 Enterprise Wi-Fi AP LED status

LED Color StatusIndication
Cambium Networks XE5-8 - LED status - 1The device is turning on.Cambium Networks XE5-8 - LED status - 2Note:If the LEDs remain amber for more than five minutes, the device has failed to turn on.
Cambium Networks XE5-8 - LED status - 3The device is turned on and accessible.The Wi-Fi services are up, if configured.
Cambium Networks XE5-8 - LED status - 4XMS or cnMaestro connection is successful.

Onboarding the Device

This chapter describes the following topics:

Overview
• Device Onboarding and Provisioning

Overview

By default, support is available for all the devices at https://cloud.cambiumnetworks.com, no user action is required to direct devices to contact either cnMaestro Cloud or XMS-Cloud. You can onboard and devices without any additional setup.

If you are using cnMaestro On-Premises, you must direct the devices to connect to the cnMaestro using DHCP options or static URL configuration. For more information, refer to the cnMaestro On-Premises User Guide.

Device onboarding and provisioning

Enterprise Wi-Fi APs support the following onboarding methods:

  • cnMaestro
  • XMS-Cloud

cnMaestro

cnMaestro is a simple next-generation network management system for Cambium Networks wireless ar wired solutions.

For onboarding devices to cnMaestro, refer to the cnMaestro User Guide.

Supported devices and minimum version

The following table lists the minimum release version of every Enterprise Wi-Fi APs that is required managed by cnMaestro Cloud and On-Premises. It also lists the minimum version of cnMaestro Clou On-Premises required to manage the respective APs.

Cambium Networks XE5-8 - Supported devices and minimum version - 1

Note

  • The AP version is the minimum version required to manage the APs using cnMaestro Cloud, On-Premises, or XMS-Cloud.
  • Similarly, the cnMaestro Cloud, On-Premises, and XMS-Cloud versions are the minimum versions required to manage the APs.

Cambium Networks XE5-8 - Note - 1

Warning

  • X7-35X, X7-53X, and X7-55X APs are not supported on XMS-Cloud. They can be managed only on cnMaestro.
  • Enterprise Wi-Fi 6 APs (XE and XV series) running Release 7.1 cannot be downgrade version earlier than 6.6.1.
  • Release 7.1 will not be available for Wi-Fi 6/6E APs in XMS-Cloud.

Table 7 Supported minimum AP and cnMaestro versions

AP ModelSupportedMinimumAP VersionSupportedMinimumcnMaestro / XMS-Cloud Version
cnMaestro CloudcnMaestro On-PremisesXMS-CloudcnMaestro CloudcnMaestro On-PremisesXMS-Cloud
XV3-86.6.03 6.6.0.36.6.0.3 Current2.4.1Current
XV2-26.6.03 6.6.0.36.6.0.3 Current2.4.1Current
XV2-2T06.6.0.3 6.6.0.36.6.0.3 Current3.1.0Current
XV2-2T16.6.0.3 6.6.0.36.6.0.3 Current3.1.1Current
XV2-22H6.6.0.3 6.6.0.36.6.0.3 Current3.1.1Current
XV2-21X6.6.0.3 6.6.0.3 NACurrent3.1.1 NA
XV2-23T6.6.0.3 6.6.0.3 NACurrent3.1.1 NA
XE3-46.6.0.3 6.6.0.3 6.6.0.3Current3.1.0 Current
XE3-4TN6.6.0.36.6.0.3NACurrent3.2.0CurrentNote: AFC and 6 GHz operation are not supported
XE5-86.6.0.3 6.6.0.3 6.6.0.3Current3.1.1 Current
X7-35X7.07.07.0NACurrent5.1.0NA
X7-53X7.17.17.1NACurrent5.3.0NA
X7-55X7.17.17.1NACurrent5.3.0NA

XMS-Cloud

XMS-Cloud makes it easy to manage networks from a single, powerful dashboard. Zero-touch provision and centralized, multi-tenant network orchestration simplifies network management functions. XMS-Cloud helps manage Cambium Enterprise Wi-Fi devices.

For onboarding devices to XMS-Cloud, refer to https://www.youtube.com/watch?v=qD-nPsdRc4Y.

Configuring the System

This chapter describes the following topics:

  • Basic
  • Management
  • Time settings
  • Event Logging
    SNMP

Basic

To configure the basic parameters for the AP, complete the following steps:

  1. Navigate to Configuration > Wi-Fi Profiles > AP Groups page.

  2. Click Add New and select Enterprise Wi-Fi (E-Series, XE/XV/X7-Series) from the Type drop-down list.

By default, the Basic tab is displayed.

Cambium Networks XE5-8 - Basic - 1

Note

  • The following special characters are supported when creating the AP Group and WLAN passwords:
  • By default, the password is not configured.
    You can also change the password after creating it.

$$ a - z A - Z _ {-} ^ {*} \& \% # @! < >. () [ ] ^ {\wedge \sim} 1 2 3 4 5 6 7 8 9 0. $$

Table 8 lists the configurable parameters that are available in the Basic tab in the cnMaestro UI.

Table 8 Basic parameters

Parameter Description Range Default
Name Hostnameof the device.Supported maximum length of the hostname: 64 characters- EnterpriseWi-Fi AP ModelNumber-Last 3 Byt of ESN
Location Locationwhere the device is placed.Supported maximum length of location: 64 characters--
Contact Contactinformation for the device. - -
Country Countryof operation of the device.To be set by the administrator only.The allowed operating channels and the respective power levels depend on the country of operation. countries supported depends on the SKU of the device (FCC and ROW).Note: Radios remain disabled unless this parameter is configured.-transmitThe list of device (FCC)
Placement Enterpriseprise Wi-Fi AP device supports both Indoor and Outdoor deployments. Based on deployment user can configure it as follows:Indoor: Only indoor channels for configured country code will be available and operational.Outdoor: Only outdoor channels for configured country code will be available and operational.Outdoor
PoE Output Enable power over Ethernet to an auxiliary device connected to PoE OUT port.
Dual 5 GHz radio Enable Dual 5 GHz radio.This parameter provides the flexibility of splitting 8x8 5 GHz radio into two 4x4 5 GHz radios.- Disabled
LED When enabled, turns on the device LEDs during operation. -Enabled
LLDP Advertises device capabilities and information in the L2 network.- Enabled
Recommended Channel DistributionAllows unique distribution of channels across radios multiple radios are configured with same frequency Note: This option is available only as a CLI-based configuration. Use the channels-distribution command.when enabled band.
Default Power PolicyProvision to configure current power policy.- Sufficient
Power Force TypeProvision to configure power force type.- None

Figure 4 The AP Groups > Basic page
AP Groups > Add New Basic Management Radio Network Security Access Control Services User-Defined Overrides Basic Information Type Enterprise WiFi (E-Series, XE/KV/X7-Series) Name* Scope Shared Shared Scope means the AP Group is accessible to all Managed Accounts ✓ Auto Sync Automatically push configuration changes to devices sharing this AP Group Country* For appropriate regulatory configuration Location Location where this device is placed (max 64 characters) Contact Contact information for the device (max 64 characters) Description Placement ● Indoor ○ Outdoor Configure the AP placement details PoE Output Off Enable Power over Ethernet to an auxiliary device connected to PoE OUT port ✓ LED Whether the device LEDs should be ON during operation ✓ LLDP Whether the AP should transmit LLDP packets ✓ Recommended Channel Distribution Disabling the recommended channel distribution allows any approved channel on any radio in APs with multiple 5/6GHz radios such as the XE3-4, XE3-4TN, and XE5-8. By default allowed channels are restricted to optimize the performance of multiple radios on the same band. Use this with advice from an RF planning expert. (applies to XE3-4, XE3-4TN and XE5-8 APs which have more than two 5/6 GHz radios) WLAN Add WLAN Create WLAN Order WLAN No WLAN Selected Save Close

Power over Ethernet (PoE) in

Enterprise Wi-Fi APs first attempt to detect the type and classification of the Power Source (PS), the being powered by, using standard hardware handshake and control logic. Some PS devices are the type, like the Cambium PoE power injectors, and therefore the AP cannot detect the type or class the PS they are being powered by. For this reason, Enterprise Wi-Fi APs also use LLDP power r

request a specific amount of PoE power from the PS. This feature in the Enterprise Wi-Fi APs is power request and it is enabled by default.

The following table lists the PoE power requirements for the Enterprise Wi-Fi APs:

Cambium Networks XE5-8 - Power over Ethernet (PoE) in - 1

Caution

Although APs may operate in accordance with the power requirements mentioned in the Hardware Power Requirement column, caution is advised as the results may be unexpected

Table 9 PoE power requirements for APs

Device PoEOut HardwarePower RequirementMaximum Power Draw (Watts)Minimum Power Required to boot (Watts)
XV3-8 No 802.3bt 35 22.9
XV2-2 No 802.3at 21 7.6
XV2-2T0 Yes(Max 30W)802.3at 51 13.3
XV2-2T1 Yes(Max 30W)802.3at 51 13.3
XV2-22H Yes(Max 10W)802.3af 22.95 8
XV2-21X No802.3af 12.958
XV2-23TNo 802.3af12.958
XE3-4No 802.3bt32 15.6
XE3-4TNYes (Max 30W)802.3at 64 15
XE5-8No 802.3bt6032.9
X7-35XNo 802.3at2512

Cambium Networks XE5-8 - Caution - 1

Note

Accurate time on the AP is critical for features such as WLAN Scheduled

Access and :

Figure 5 Power policy configuration
AP_GroupS > Ent_Mesh_ZeroTouch_APGrp Networks Wi-Fi AP Groups System Default Enterprise Default Home Ent_Mesh_ZeroTouch_APGrp Dashboard Notifications Configuration Statistics Devices Clients Mesh Peers Basic User-Defined Overrides Advanced configuration settings entered below will be applied on top of the AP Group settings sent to the device. This allows you to apply configuration not supported in the previous screens. If there are conflicts, the below settings will take precedence. The format used is the same as a configuration file exported from the device via its web UI or the "View Device Configuration" link in the device level configuration page. Management Radio Variables and Macros Network Settings entered are not validated or error-checked (However, dollar ($), period () or space characters are not allowed in a variable name and it should not be more than 64 characters long), and they may overwrite configuration made in previous screens. so please use them with caution. You are responsible for ensuring the resulting AP Group is valid and safe to use. Security Services User-Defined Overrides power policy limited power force Unknown 1

Table 10 lists the Cambium PoE injectors and cnMatrix models supported on the APs.

Table 10 Supported Cambium PoE Injectors and cnMatrix models

AP ModelCambiumPoEInjectorcnMatrixRecommendedModel
XV3-8N0000000L142AEX3028R-P / EX3052R-P/ EX2016M-P
XV2-2N0000000L142AEX3028R-P / EX3052R-P/ EX2016M-P
XV2-2T0N00000000L142AEX3028R-P / EX3052R-P/ EX2016M-P
XV2-2T1N00000000L142AEX3028R-P / EX3052R-P/ EX2016M-P
XV2-22HN00000000L142A/ N000000L034BEX3028R-P / EX3052R-P / EX2016M-P / EX2052-P / EX2052R-P / EX2028-P / P / EX1028-P / EX1010-P
XV2-21XN00000000L142A/ N000000L034B / N000900L017A/ EX3028R-P / EX3052R-P / EX2016M-P / EX2052-P / EX2052R-P / EX2028-P / P / EX1028-P / EX1010-P
XV2-23TN00000000L142A/ N000000L034B / N000900L017A/ EX3028R-P / EX3052R-P / EX2016M-P / EX2052-P / EX2052R-P / EX2028-P / P / EX1026-P / EX1010-P
XE3-4N0000000L142AEX3028R-P / EX3052R-P/ EX2016M-P
XE3-4TNN00000000L142AEX3028R-P / EX3052R-P/ EX2016M-P
XE5-8N0000000L142AEX3028R-P / EX3052R-P/ EX2016M-P
X7-35XN000000L142AEX3028R-P / EX3052R-P/ EX2016M-P

Cambium Networks XE5-8 - Note - 2

Attention

Configure Power policy and power force type based on the input power source.

Power over Ethernet (PoE) Out port

PoE out provision is provided to power on devices that are compatible with IEEE 802.3 af/at PoE power consumption or Cambium 30V POE as shown in the below table.

Table 11 PoE-out capabilities

APModel10W48V@15W48V@30W30V@30WDefaultState

Figure 6 PoE Output cnMaestro configuration

AP Groups > Ent_Mesh_ZeroTouch_APGrp Dashboard Notifications Configuration Statistics Devices Clients Mesh Peers Basic Placement Indoor Outdoor Configure the AP placement details PoE Output Off Enable Power over Ethernet to an auxiliary device connected to PoE OUT Network Search During operation Security Off cambium-poe 802.3af User-Defined Overrides Delete

LLDP is a Layer 2 network protocol used to share information, such as the device manufacturer, or network capabilities, and IP address with other directly connected network devices. APs can both act their presence by sending LLDP announcements and can also collect and display information sent by neighbors.

LLDP settings are enabled by default on the AP. This implies that the power negotiation is also LLDP when an AP is powered by a Power over Ethernet (PoE) PSE switch port.

This window allows you to establish your LLDP settings.

Power negotiation

LLDP discovers a device port (connected to a PoE PSE switch, for example) that supplies power t. The AP checks that the port can supply the maximum power that is required by the AP model. the required maximum power (in watts) via LLDP frames to the PoE source and expects the PoE reply with the amount of power that can be allocated.

  • If the AP receives a response confirming that the power allocated by the PoE PSE source is greater than the maximum power requested, the AP enables radios and other Model Specific peripherals (for example, USB port, Bluetooth).
  • If the AP receives a power allocation that is less than the maximum but more than the minimum to keep the radios operational, the AP issues a Syslog message and shuts down the other port (for example, USB port, Bluetooth).

  • If the AP receives less than the minimum power required for the radios to operate, the radios down for five minutes. During this time, LLDP power negotiation continues to monitor the available power to ensure it meets the minimum requirement for the AP radios to function.

  • Click to check power status: show power

This provides a more graceful way of handling an underpowered situation on a Wi-Fi device. When radios are turned off, XMS can notify you so that you don't have to hunt down an intermittent

CLI Configuration

Consider the following tasks to configure the CLI:

To enable:

ap(config)# lldp

ap(config)#

To disable:

ap(config)# no lldp

ap(config)#

To list LLDP configuration:

show lldp configuration

show lldp interfaces

Request power

To enable/disable power negotiation via LLDP:

ap(config)# lldp

request-power : Enable power negotiation (default:enabled)

tx-hold : Set transmit hold multiplier (default:4, used to calculate the time-to-live (tx-interval * tx-hold))

tx-interval : Set LLDP packet transmit delay (in Sec, default:30 sec)

ap(config)# lldp request-power

ap(config)# lldp request-power

Transmit hold

It is used to compute the Time To Live (TTL) value. This is the time during which the receiving maintains information before the validity of information expires.

ap(config)# lldp

request-power : Enable power negotiation (default:enabled)

tx-hold : Set transmit hold multiplier (default:4, used to calculate the time-to-live (tx-interval * tx-hold))

tx-interval : Set LLDP packet transmit delay (in Sec, default:30 sec)

ap(config)# lldp tx-hold

Specify transmit hold multiplier value (max 65535)

Transmit interval

It is the time interval between two regular LLDP packets transmissions. The AP sends out LLDP announcements, advertising its presence at this interval. The default value is 120 seconds.

ap(config)# lldp

request-power : Enable power negotiation (default:enabled)

tx-hold : Set transmit hold multiplier (default:4, used to calculate the time-to-live (tx-interval * tx-hold))

tx-interval : Set LLDP packet transmit delay (in Sec, default:30 sec)

ap(config)# lldp tx-interval

Specify LLDP transmit delay in sec (max 65535)

Management

Administrator Access

To configure Administrator access parameters, complete the following steps:

  1. Navigate to Configuration > Wi-Fi Profiles > AP Groups page.

  2. Click Add New and select Enterprise Wi-Fi (E-Series, XE/XV/X7-Series) from the Type drop-down list.

  3. Click Management tab > Administrator Access section.

Table 12 lists configurable fields that are displayed in the Administrator Access section.

Table 12 Administrator Access parameters

ParameterDescription Range Default
Admin PasswordPassword for authentication of UI and CLI sessions. - admin
Telnet EnablesTelenet access to the device CLI. - Disabled
SSH EnablesSSH access to the device CLI.- Enabled
SSH KeyProvision to login to device using SSH Keys. The user is Delated to public key in this section. If configured, the user has using Private Keys. This is applicable for both CLI and GUI.- Delated to login to API.- Delated to app adding to API.
HTTPEnables HTTP access to the device UI.- Enabled
HTTP PortProvision to configure HTTP port number to access device UI.1-6553580
HTTPSEnables HTTPS access to the device UI.- Enabled
HTTPS PortProvision to configure HTTPS port number to access device UI.1-65535443
RADIUS Mgmt AuthUser has provision to control login to AP using RADIUS- Disabled authentication. If enabled, every credential that is provided by the user undergo RADIUS authentication. If successful, allowed to login to UI of the device. This is applicable for both CLI and GUI.
RADIUS ServerProvision to configure RADIUS IPv4 server for Management Authentication.-
RADIUS SecretProvision to configure RADIUS shared secret for Management authentication.-

Figure 7 Administrator Access page

Administrator Access Admin Password ...... Show Configure password for authentication of GUI and CLI sessions (max 32 characters) Change your password, do not use default passwords! Telnet Enable Telnet access to the device CLI SSH Enable SSH access to the device CLI SSH Key Show Use SSH keys instead of password for authentication HTTP Enable HTTP access to the device GUI HTTP Port 90 Port for HTTP access to the device GUI (1-65535) HTTPS Enable HTTPS access to the device GUI HTTPS Port 443 Port for HTTPS access to the device GUI (1-65535) RADIUS Mgmt Authentication Enable RADIUS authentication of GUI/CLI sessions RADIUS Server RADIUS server IP/Hostname RADIUS Secret Show RADIUS server shared secret

HTTPS Proxy server configuration

The proxy management service is established in the AP to proxy management of traffic for remote management services originating from the AP.

For zero-touch configuration, refer to DHCP Option 43 - Zero-touch onboarding.

CLI Configuration:

ap(config)# management proxy
https : Enable HTTPS proxy support
ap(config)# management proxy https
host : Configure HTTPS proxy host 
password : Configure HTTPS proxy password
port : Configure HTTPS proxy port
username : Configure HTTPS proxy username 

Time settings

User can configure up to two NTP servers. These are used by the AP to set its internal clock time zones configured on the device. While powering ON the AP, the clock resets to default and time as the Enterprise Wi-Fi AP does not have battery backup. The servers can be specified as or as a hostname (For example, pool.ntp.org). If NTP is not configured on the device, the device synchronizes the time with cnMaestro if onboarded.

To configure time parameters, complete the following steps:

  1. Navigate to Configuration > Wi-Fi Profiles > AP Groups page.

  2. Click Add New and select Enterprise Wi-Fi (E-Series, XE/XV/X7-Series) from the Type drop-down list.

  3. Click Management tab > Time Settings section.

Table 12 lists configurable fields that are displayed in the Time Settings section.

Table 13 Time Setting parameters

Parameter Description Range Default
Time zone The time zone can be set according to the location where the is installed. Selecting the appropriate time zone from down list ensures that the device clock is synced with the clock time.Cambium Networks XE5-8 - Time settings - 1 NoteAccurate time on the AP is critical for features such as WLAN Scheduled Access and Syslogs.where the drop-wall
NTP Server 1Name or IPv4 address of Network Time Protocol server 1. --
NTP Server 2Name or IPv4 address of Network Time Protocol server 2.- -

Figure 8 Time setting page
Time Settings Time Zone Configure Time Zone NTP Server 1 Name or IP Address of Network Time Protocol Server NTP Server 2

Event logging

The Enterprise Wi-Fi AP devices support multiple troubleshooting methods. Event logging or Syslog is of the standard troubleshooting processes. If you have a Syslog server in your network, you can an Enterprise Wi-Fi AP device. A maximum of two Syslog servers can be configured on an Enterprise AP device. Events are sent to both configured Syslog servers if they are up and running.

To configure event logging, complete the following steps:

  1. Navigate to Configuration > Wi-Fi Profiles > AP Groups page.
  2. Click Add New and select Enterprise Wi-Fi (E-Series, XE/XV/X7-Series) from the Type drop-down list.
  3. Click Management tab > Event Logging section.

Table 14 lists configurable fields that are displayed in the Event Logging section.

Table 14 Event logging parameters

ParameterDescription Range Default
Syslog Server 1Hostname or IPv4 address of the Syslog server and respective number.spec514port
Syslog Server 2Hostname or IPv4 address of the Syslog server and respective number.spec514port
Syslog SeverityProvision to configure severity of Logs that must be forwarded server. The Log levels supported are as per RFC.warDebugothe

Figure 9 Event logging page
Event Logging Syslog Server1 Port xxxxxxx.xxx.xxx 514 Name or IPv4/IPv6 address of syslog server Syslog Server2 Port xxxxxxx.xxx.xxx 514 Syslog Severity Debug (Level 7) Specify severity of events forwarded to Syslog servers

SNMP

To configure SNMP, complete the following steps:

  1. Navigate to Configuration >Wi-Fi Profiles >AP Groups page.
  2. Click Add New and select Enterprise Wi-Fi (E-Series, XE/XV/X7-Series) from the Type drop-down list.
  3. Click Management tab > SNMP section.

Table 14 lists configurable fields that are displayed in the SNMP section.

Table 15 SNMP parameters

Parameter Description Range Default
Enable Provisionto enable SNMPv2 or SNMPv3 support on the device - -
SNMPv2c RO communitySNMP v2c read-only community string. - public
SNMPv2c RW communitySNMP v2c read-write community string. - private
Trap Receiver IP Provision to configure SNMP trap receiver IPv4 server. - -
SNMPv3 UsernameEnter the username for SNMPv3. - -
SNMPv3 PasswordEnter the password for SNMPv3. - -
Authentication Provision to choose the authentication type as MD5 or SHA. - MD5
AccessProvision to choose Access type as read-only or read-write.-RO
EncryptionChoose ON or OFF. APs use the AES algorithm for encryption.-ON

Cambium Networks XE5-8 - SNMP - 1

Note

The AP uses the AES-128 algorithm for encryption. It uses the SNMPv3 password configuration parameter for encryption and authentication.

Figure 10 SNMP parameters
SNMP Enable Enable SNMP support on the device SNMPv2c RO Community public SNMPv2c read-only community string (max 64 characters) SNMPv2c RW Community private SNMPv2c read-write community string (max 64 characters) Trap Receiver IP xxxxxxxxxxxxxx SNMP trap server IP address SNMPv3 Username SNMPv3 user name (max 32 characters) SNMPv3 Password Show SNMPv3 password (8 to 32 characters) Authentication MD5 SHA Access Read-Only Read-Write Encryption On Off

Configuring the Radio

This chapter describes the following topics:

  • Overview
  • Configuring Radio parameters
  • BSS coloring
    • Target Wake Time (TWT)
  • Receive sensitivity configuration
    • Multicast-snooping and Multicast-to-Unicast conversion
  • Boot loop detection

Overview

Enterprise Wi-Fi AP devices support numerous configurable radio parameters to enhance the quality of service according to the deployment.

Configuring Radio parameters

The XV3-8 Tri-Band Indoor Wi-Fi 6 AP can operate in either Dual Band Simultaneous (DBS) or Sir Simultaneous (SBS). This feature provides the flexibility of splitting 5 GHz radio into two independent configurable and operational radios. In DBS mode, 5 GHz radio operates as single radio with an 8 configuration. In SBS mode, 5 GHz Radio operates as split radio with each 4x4 configuration. Confir parameters under the Radio profile are listed below.

  • Basic
    • Software-Defined Radio (SDR) capabilities
    • Enhanced Roaming

Basic

To configure radio parameters, complete the following steps:

  1. Navigate to Configuration >Wi-Fi Profiles >AP Groups page.
  2. Click Add New and select Enterprise Wi-Fi (E-Series, XE/XV/X7-Series) from the Type drop-down list.
  3. Click Radio tab > Basic section.
    Table 16 lists the configurable fields that are displayed in the Radio > Basic section.

Table 16 Configure Radio parameters

ParameterDescription Range Default
Radio
Enable Enables the operation of radio. - Enabled
Band Select the appropriate radio band, if the radiosupports multiple bands.-
Channel Select the channel from the drop-down list. Channel the drop-down list are populated based on the configured.Wi-Fin 7 APscountry2.4 GHz: 15 GHz: 36-64, 100 - 144,and 149 - 1656 GHz: 1 -233Wi-Fi 6/6E APs2.4 GHz: 1 - 145 GHz: 36-1736 GHz: 1 -233Auto- 13-144, and 145-233
Channel WidthSpecifies the channel widths for the operation. following widths are supported:For 2.4 GHz: Only 20 MHz channel width supported.For 5 GHz: 20 MHz, 40 MHz, 80 MHz, channel widths are supported.For 6 GHz: 20 MHz, 40 MHz, 80 MHz, 320 MHz channel widths are supported.Cambium Networks XE5-8 - Basic - 1Note320 MHz width is supported on the X7-35XAP only and can be configured only using the channel-width CLI command.ap(config)# wireless radio <1-3>ap(config-radio-3)# channel-width 320Theisand 160 MHz160 MHz, andX7-35Xusing2.4GHz: 20MHz5GHz: 40MHz6GHz: 80MHz
Transmit PowerTotal conducted transmit power, in decibel-milliwatt(dBm), of each radio based on coverage and maximum transmit power of Enterprise Wi-Fi AP varies based on model number.Details of transmit power supported by each Enterprise Wi-Fi AP device are available athttps://www.cambiumnetworks.com/products/wifi/.Transmit power varies as per the country where the AP is deployed.. The default value is AUTO, which means radio transmit power is configured to the maximum as per the county configured.• 2.4 GHz: 4 SLA.30The devices• 5 GHz: 4 to 30EnterpriseGHz: 4 to 30Auto
Beacon IntervalSpecifies the time duration (in milliseconds) between consecutive Beacons.50ms two 3400ms100
Minimum Unicast rateSpecifies the coverage area of the Enterprise device. The higher the rate selected, the lesser and the 802.11g. data You can configure this value based on the SLAates the deployment. The drop-down list contains all values advertised by Enterprise Wi-Fi AP devices, including legacy, HE, HT, and VHT rates.Wi-Fi 802.11b1Mbps
Candidate ChannelsSpecifies selective channels based on user required. Options vary based on a band of operation and follows:For 2.4 GHz:AllSpecificFor 5 GHz:AllSpecificPrefer Non-DFSPrefer DFSFor 6 GHz:AllSpecificWi-Fi 7 APs• 2.4 GHz: 1• 5 GHz: 36 - 64, 100 - 144, and 149 - 165• 6 GHz: 1 -233Wi-Fi 6/6E APs• 2.4 GHz: 1• 5 GHz: 36 - 173• 6 GHz: 1 -233All- 13- 14-
Mode AllEnterprise Wi-Fi AP devices support either 802.11ac 802.11ac Wave 1, or 802.11ac Wave 2, or 802.11be. Some legacy clients might not work as expected; therefore, this parameter can be tuned for backward compatibility based on wireless clients. Note Cambium Networks XE5-8 - Basic - 2 You can configure the be or ax-be mode by using the mode CLI command ap(config)# wireless radio <1-3> ap(config-radio-3)# mode beWi-Fi 7 APs 11be. Some 2.4 GHz: b/g/n/ax/be 5 GHz: a/n/ac/ax/be radio6 GHz: ax/be d only: Wi-Fi 6/6E APs 2.4 GHz: b/g/n/ax 5 GHz: a/n/ac/axAll mode
Short Guard IntervalStandard 802.11 parameter to increase the through an Enterprise Wi-Fi AP device.ghpEnabled
Off Channel Scan (OCS)
Enable Provision to enable OCS on a device to capture clients and APs.neighbor-
Dwell-timeConfigure the time period to spend scanning of devices on a channel.50+300 50ms
Auto-RF (Dynamic Power)
Enable Enable or disable dynamic power management. - -
Mode Selectthe required dynamic power modes. Two modes are supported: By-Channel By-Banddes By-Channel
Minimum Transmit PowerThe minimum transmit power that the AP can radio when adjusting automatic cell sizes5st5gndBm 8 dBm
Minimum Neighbour ThresholdThe minimum number of neighbors to consider reduction by automatic cell logic.100 power
Cellsize Overlap ThresholdCell overlap will be allowed when the AP is automatic cell sizes.determining50%
Auto-RF (Dynamic Channel)
Enable Enable or disable the Dynamic Channel auto-RF functionality.Disabled
Packet Error RateEnable channel change using unsuccessful packet transmissions by the AP.
Packet Error Rate ThresholdSpecifies the packet error rate threshold in percentage 30 (%).
Number of Packet Error Rate samplesSpecifies the number of packet error rate samples needed to trigger a channel switch.120 40
Channel UtilizationEnable channel change using the channel efficiency.
Channel Utilization ThresholdSpecifies the channel utilization threshold in percentage 70 (%).
Number of Channel Utilization samplesSpecifies the number of channel utilization samples needed to trigger a channel switch.5300 100
Noise Enable channel change with higher noise.
Noise ThresholdSpecifies the noise threshold in dBm. -70 to -90 dBm -70
Number of Noise samplesSpecifies the number of noise samples needed a channel switch.5120 trigger
Auto-RF IterationsSpecifies the number of times the Auto-RF channel change function must run, at the configured frequency, before stopping.The iteration count resets when the AP restarts or when the radio resets.The default value is 0. It indicates that the Auto-RF channel change function will run at the frequency configured in either of the following parameters stopping:Enable time range for Auto-RFChannel Hold TimeNoteWhen the AP exceeds the configured iteration count, the Dynamic Channel Selection (DCS) method of channel selection takes over.For more information on Auto-RF, see Auto-RF.0-400 without0
Samples Specifies the minimum number of samples required run the channel selection.1-20 3
Enable time range for Auto-RFSpecifies the time range (in the 24 hour form at) at which the Auto-RF channel change function must run When enabled, select the start and end time.at) at which everyday.
Channel Hold TimeSpecifies the time (in minutes) for which the AP must start and the channel.must start and minutes for APs running version 6.6.0.1 and later• 1-4320 minutes for APs running versions earlier than 6.6.0.1.1440

To configure Auto-RF (Dynamic Channel) using the CLI, execute the following commands:

ap(config-radio-1)# auto-rf dynamic-channel

acceptance-per-threshold : Configure Acceptance Packet Error Rate (PER) threshold
channel-hold-time : specifies how much time AP needs to hold the channel. Default is 1440 mins
cmbnbr-minsnr : Configure the cambium neighbour minimum SNR to consider as part of autorf cambium neighbour factor
congestion-channel-switch : Enable / Disable Congestion based channel switch, disabled by default 
congestion-threshold : Configure Congestion threshold
count : Configure number of times autorf need to run;
'0' disables this feature
dcs-monitor-interval : Configure dcs monitor interval in minutes.
dcs-trigger-threshold : Configure dcs trigger threshold percentage
per-channel-switch : Enable / Disable PER based channel switch,
disabled by default
samples : Configure the minimum number of samples
required to run the channel selection
schedule-time : Configure time range (24 hour format) at which
autorf algorithm need to run everyday
weightage-map-index : Configure weightage map index 

To configure Auto-RF (Dynamic Power) using the CLI, execute the following commands:

ap(config-radio-1)# auto-rf dynamic-power
cellsize-overlap-threshold : Cell overlap that will be allowed when the AP is determining automatic cell sizes
maximum-transmit-power : Maximum transmit power that the AP can assign to a radio when adjusting automatic cell sizes
minimum-neighbor-threshold : The Minimum number of neighbors to consider for power reduction by autocell logic
minimum-transmit-power : Minimum transmit power that the AP can assign to a radio when adjusting automatic cell sizes
mode : Set dynamic power mode by-channel/by-band 

Figure 11 Radio parameters in the Basic page
Basic Status Enabled Disabled Enable/Disable operation of this radio Channel Auto Only 'Auto' value is allowed. Configure static channel under the 'Advanced Settings' section available on the Access Point level configuration page Learn more Candidates Channel All Candidate channels is a list of channels on which AP can operate. List of channels depend on the band and country. Channel Width 20 Operating width of the channel Transmit Power Auto Radio transmit power in dBm (4 to 30; subject to regulatory limit) Beacon Interval 100 Beacon interval in ms (50 to 3500) Minimum Unicast Rate 1 Configure the minimum unicast management rate (Mbps) Multicast Data Rate Highest Basic Data-rate to use for transmission of multicast/broadcast packets Mode Default Allow 802.11 b/g/n clients to connect Airtime Fairness: Enable Airtime Fairness to improve performance of 1in and 1lac clients by throttling legacy clients Short Guard Interval Enable Short Guard interval to increase device throughput

Figure 12 Channel Scan - Off Channel Scan option
Channel Scan Off Channel Scan ○ Continuous Background Scan ○ None Enable/Disable operation of this radio OCS periodically goes away from current operating channel (home channel) to other channels and collects data about neighboring clients, AP and RF characteristics. Dwell time 50 Configure Off Channel Scan dwell time in milliseconds (50-300)

Figure 13 Channel Scan - Continuous Background Scan option

Channel Scan Off Channel Scan Continuous Background Scan None Enable/Disable operation of this radio Continuous background scan (CBS) reduces the dwell time, controls the channel switches and also monitors the voice data queues. Rest Time 6 Rest Time — Interval between scans on different channels (5-15). Wait Time 2 Configure wait time in minutes to wait after all channels are scanned and before starting a new scan (1-10) Dwell Split Time 25 Configure dwell split time to spend on foreign channel Dwell Rest Time 100 Configure time interval between scans on same channel (100-1000) Channel Switch Announcement Use channel switch announcement as a part of channel change

Figure 14 Auto-RF - Dynamic Channel
Auto-RF Auto-RF Dynamic Power option adjusts the radio transmit power based on the neighboring Cambium APs transmit power, Auto-RF Dynamic Channel changes the radio channel based on current operating channel RF conditions like channel utilization, interference, packet error rate, etc. Mode Selection Dynamic Channel Dynamic Power Enable Enable Auto-RF to adjust dynamic channel selection based on RF conditions Packet Error Rate Enable channel change using unsuccessful packet transmissions by the AP Channel Utilization Enable channel change using the channel efficiency Noise Enable channel change with higher noise Auto-RF Iterations 0 Configure number of times Auto-RF needs to run (0-100). 0 disables this feature Samples 3 Configure the minimum number of samples required to run the channel selection (1-20) Enable time range for Auto-RF. Configure time range (24 hour format) at which Auto-RF needs to run everyday. Channel Hold Time 1440 Channel hold time specifies how much time AP needs to hold the channel <1-44640> mins for build '6.6.01' and onwards. Range <1-4320> applies for AP running build below '6.6.01'. Deprecated (Version 3.11.4 and 4.0) Channel Selection Mode Interference Channel selection done based on interference Channel Utilization Threshold 25 Configure channel utilization threshold in %(20-40)

Figure 15 Auto-RF - Dynamic Power
Auto-RF Auto-RF Dynamic Power option adjusts the radio transmit power based on the neighboring Cambium APs transmit power. Auto-RF Dynamic Channel changes the radio channel based on current operating channel RF conditions like channel utilization, interference, packet error rate, etc. Mode Selection Dynamic Channel Dynamic Power Enable-Enabling Dynamic Power management By-Channel By-Band Set dynamic power mode by-channel / by-band Maximum Transmit Power 30 Maximum transmit power that the AP can assign to a radio when adjusting automatic cell sizes. (5-30) dBm Minimum Transmit Power 8 Minimum transmit power that the AP can assign to a radio when adjusting automatic cell sizes. (5-20) dBm Minimum Neighbour Threshold 2 The Minimum number of neighbors to consider for power reduction by autocell logic. (1-10) Cellsize Overlap Threshold 50 Cell overlap that will be allowed when the AP is determining automatic cell sizes (0-100) %

Software-Defined Radio (SDR) capabilities

Cambium Networks XE5-8 - Software-Defined Radio (SDR) capabilities - 1

Note

  • In XV3-8, radio 3 is available only in the SBS mode.
  • In XE5-8, radio 5 is available only in the SBS mode.

Table 17 Supported radios

Access Point ModelRadio 1 (2.4 GHz)Radio 2 Radio 3 Radio 4(5 GHz)Radio 5 (5 GHz)
XV3-8√ (DBS)√ (SBS)
XV2-2
XV2-2T0
XV2-2T1
XE3-4√ √√ √
XE3-4TN√ √√ √
XE5-8√ √√ √ √(DBS)√ (SBS)
XV2-21X
XV2-23T
XV2-22H

GHz 6 GI

Table 18 Factory reset behavior of multi-radio APs

Access Point ModelRadio 1 (2.4 GHz)Radio 2 Radioo 3 Radio 4(5 GHz)Radio 5 (5 GHz)
5 GHz6 GHz5 GHz6 GHz
XV3-8ONONNAOFFNA--
XE3-4ONONNAOFFON--
XE3-4TNONONNAOFFON--
XE5-8ONONOFFOFFONON4x4 SBSON4x4 SBS

The Radio page allows the user to enable or disable the Software-Defined Radio (SDR) operations. It allows to configure Software Defined Radios, Basic, Enhanced Roaming, Off Channel Scan, Auto-RF, and External Antennas.

AP Groups > tests Dashboard Notifications Configuration Statistics Reports & Devices Clients Mesh Pass Rsc: Software Defined Radios Management XV3.0 2 x 5GHz 5 GHz (dB) N/A N/A N/A Radio XE3-4/163.4TN 2 x 5GHz 5 GHz 8 GHz N/A N/A Network XES-0 2 x 5GHz 5 GHz 8 GHz 8 GHz (5GHz Lat) 5 GHz Security Access Control 2.4 GHz Band 5 GHz Band 6 GHz Band Services Basic Enhanced Roaning Channel Scan Auto-RP External Antennas Model Radio 1 Radio 2 Radio 3 XE3-4TN Overheadset... Overheadset... Overheadset... Save

Cambium Networks XE5-8 - Note - 2

Note

The software-defined radio creation and channel listing are populated based on the count specific restrictions, device type, and release version.

Software-Defined Radio

Software-Defined Radio (SDR) allows you to configure radio parameters for XV3-8, XE3-4, XE3-4TN, an XE5-8 device models. By default these device models are configured for radio bands as shown in figure. The other radio bands for which the devices can be configured are as shown in Table 19

Table 19 Supported Radio bands for Enterprise Wi-Fi Series (XE, XV-Series)

ModelsRadios Supported Radio BandsChannel Specification
Channel widthDefault Channel widthSupported channel list
XV3-8Radio 1 2.4 GHz20/40 20 1 to 13
Radio 2 5GHz (8x8 - single radio) or 5 GHz(Split 4x4 dual radio)20 / 40/ 80 40100 to 36 to 165 in in 8x8 Split 4x4 single dual radio
Radio 3 20/ 40 / 80 4036 to64in Split 4x4 dual radio
ModelsRadios SupportedRadio BandsChannel Specification
Channel widthDefault Channel widthSupported channel list
XE3-4Radio 1 2.4 GHz 20/40 20 1 to 13
Radio 2 5GHz 20 / 40 /80 40 36to 64
Radio 3 5GHz 20 / 40 /80 / 16040 100to 165
6 GHz160Any 6 GHz channel
XE3-4TNRadio 12.4 GHz20/40201 to 13
Radio 2 5GHz 20 / 40 /80 4036 to 64
Radio 3 5GHz 20 / 40 /80 / 16040 100to 165
6 GHz160Any 6 GHz channel
XE5-8Radio 1 2.4GHz 20/40 201 to 13
Radio 25 GHz or 6GHz 20 / 160/ 20/80** 80Refer to Table 20 for supported channel list in 5 GHz and 6 GHz.
Radio 35 GHz or 6GHz 20 / 160/ 20/80** 80
Radio 45 GHz (8x8 - radio) or 5 GHz (Split 4x4 dual radio)20ngle 40 Hz/ 80 20 / 80
Radio 520 / 40
* 5 GHz **6 GHz

Cambium Networks XE5-8 - Software-Defined Radio - 1

Note:

  • Split 4x4 is supported only on APs that support 8x8 spatial streams. Supported APs are XV3-8 and XE5-8.
  • Dual 5 GHz Radio (Only supported on XV3-8 and XE5-8 APs) Splits 8x8 5 GHz radio into two 4x4 5 GHz radios.

Table 20 Supported Channel list 5 GHz or 6 GHz in XE5-8

Radio IndexRadio 1Radio 2Radio 3Radio 4Radio 5
8x8 mode of operation: Radio 4 & 5 as single radio with 8x8
Radio 2Radio 3Radio 4 and 5
Radio Index Radio 1 Radio 2 Radio 3 Radio4Radio 5
5 GHz5 GHz 5GHz NA 100 to128 149to 165 36to 64
6 GHz5 GHz 5GHz NA Any 6GHzchannel100 to 16536 to 64
5 GHz6 GHz 5GHz NA 100 to165 Any6 GHzchannel36 to 64
6 GHz6 GHz 5GHz NA * 1to 93** 97 to233 / 65 to36 to 165 93
Split 4x4 mode of operation: Radio 4 and 5 as individual radio with 4x4
Radio 2Radio3 Radio4 Radio5
5 GHz5 GHz5 GHz5 GHzNA60 to 64100 to 128149 to 16536 to 40
6 GHz5 GHz5 GHz5 GHzNAAny 6 GHz channel100 to 128149 to 165to 36 to 64
5 GHz6 GHz5 GHz5 GHzNA100 to 128Any 6 GHz channel149 to 16536 to 64
6 GHz6 GHz5 GHz5 GHzNA* 1 to 93** 97 to 233100 to 16536 to 64
Note: *FCC SKU 6GHz UNII-5 or 6 (1 - 93) EU SKU UNII-5 low (1 - 61)**FCC SKU 6GHz UNII-7 or 8 (97 - 233) EU SKU UNII-5 High (65 - 93)

Cambium Networks XE5-8 - Note: - 1

Note

You can use the no channels-distribution global configuration CLI command for all multi-radio platforms, such as XE3-4, XE3-4TN, and XE5-8 APs. When configured on device, default channel list can be overridden.

Off Channel Scan (OCS)

The following figure illustrates how to configure Off Channel Scan using the CLI:

ap(config)# wireless radio 2
ap(config-radio-2)# off-channel-scan

dwell-time : Configure Off-Channel-Scan dwelltime
interval : Configure Off-Channel-Scan interval
type : Configure active/passive Off-Channel-Scan 
ap(config-radio-2)# off-channel-scan type
active : active off channel scan
passive : passive off channel scan 

Table 21 lists the fields that are required for configuring Off Channel Scan:

Table 21 Configuring Off Channel Scan

ParameterDescription Range Default
dwell timeProvision to configure Off Channel Scan dwell time. Need 100 or more than 100+ ms for supporting passive scan50-300ch method.50ges

Enhanced Roaming

Table 22 lists configurable fields that are displayed in the Radio > Enhanced Roaming tab.
Table 22 Configuring Radio >Enhanced Roaming parameters

ParameterDescription Range Default
Enhanced Roaming
Enable Provision to enable enhanced roaming on device. - Disabled
Roam SNR thresholdEnterprise Wi-Fi AP device triggers de-authentication of the 100 wires station when the wireless station is seen at configured below.SNR level or

Enhanced Roaming Please enable enhanced roaming only in networks with sufficient signal strength throughout the coverage area, otherwise clients could face connectivity issues Enable Enable active disconnection of clients with weak signal Roam SNR Threshold 15 SNR below which clients will be forced to roam (1-100 dB)

BSS Coloring

Multiple APs operate on a shared channel by mitigating co-channel interference. This is achieved that spatial reuse technique known as BSS Coloring, which enables devices in one BSS to ignore frame other BSSs on the same channel that are typically some distance away.

Target Wake Time (TWT)

The Target Wake Time (TWT) feature, included in the IEEE 802.11ax amendment, provides a mechan schedule transmissions at a specific time or set of times for individual STAs to wake to exchange AP. Using TWT, each STA negotiates awake periods with the AP to transmit and receive data packet

allowing the STA to go to doze mode to minimize energy consumption and reduce contention with basic service set (BSS).

Cambium Networks XE5-8 - Target Wake Time (TWT) - 1

Note

By default, BSS coloring and TWT are enabled.

Receive sensitivity configuration

This feature allows users to configure the receiver sensitivity per radio. The configuration hooks are exposed from both CLI and XMS-Cloud. cnMaestro does not expose any hooks for configuring receiver configuration. Receiver configuration determines the signal power required at the receiver to achieve targeted or configured bit rate. Every RF receiver comes with a default sensitivity, which may not sufficient for achieving the required RF performance in terms of meeting the bit rate. Therefore, reconfiguration of receiver sensitivity is suggested.

Multicast-snooping and Multicast-to-Unicast conversion

Multicast-to-Unicast conversion heavily depends on multicast (IGMP) snooping. With IGMP snooping enabled, the device monitors IGMP traffic on the network and forwards multicast traffic to only the downstream interfaces that are connected to interested receivers. The device conserves bandwidth by sending multicast traffic only to clients connected to devices that receive the traffic (instead of floor traffic to all the downstream clients in a VLAN).

The functionality to preserve both multicast and unicast MAC addresses during multicast enhancement implementation for packets in APs is introduced. The AP supports Directed Multicast Services (DMS) Multicast Enhancement (ME). ME is a feature provided in APs that allows multicast frames to be set unicast frames to each member of the mentioned multicast group to improve the QoS of the transaction between the STA and the AP. The multicast frame is received at the host WLAN driver as an 8 frame. This frame header contains the destination and source address, which are the multicast group address and client address, respectively. Iteratively, the Ethernet header is replaced with the unicast addresses of the clients present in the multicast group and sent out to the "air". During this process, multicast group address is completely lost from the frame.

CLI Configuration:

Bridge Snooping Hash Table -- IPv4
NUM GROUPFDBPORTAGE
IPv4 Router Ports: None
Bridge Snooping Hash Table -- IPv6
NUM GROUPFDBPORTAGE
IPv6 Router Ports: None XV3-8-EC7708(config)# service show mcastsnoop br0 acltbl
IGMP ACL TABLE: PATTEN 01:224.000.000.001/255.255.255.255 - 00:00:00:00:00:00:00:00:00:00:00 -- SYSTEM WIDE MANAGEMENT PATTEN 02:224.000.000.000/255.255.000.000 - 00:00:00:00:00:00:00:00:00:00:00:00 -- MANAGEMENT PATTEN 03:239.255.000.000/255.255.000.000 - 00:00:00:00:00:00:00:00:00:00:00:00 -- MANAGEMENT PATTEN 04:239.255.255.250/255.255.255.255 - 00:00:00:00:00:00:00:00:00:00:00:00 -- NON SNOOPING PATTEN 05:224.000.000.251/255.255.255.255 - 00:00:00:00:00:00:00:00:00:00:00:00 -- NON SNOOPING PATTEN 06:224.000.000.252/255.255.255.255 - 00:00:00:00:00:00:00:00:00:00:00--NON SNOOPING PATTEN 07:000.000.00, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1PATTEN 1:fffO1:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc:ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :ccccc :cctc :cctc :cctc :cctc :cctc :cctc :cctc :cctc :cctc :cctc :cctc :cctc :cctc :cctc :cctc :cctc :cctc :cctc :cctc :cctc :cctc :cctc :cctc :cctc :cctc :cctt : cctt : cctt : cctt : cctt : cctt : cctt : cctt : cctt : cctt : cctt : cctt : cctt : cctt : cctt : cctt : cctt : cctt : cctt : cctt : cctt : cctt : cctt : cctt : cctt : cctt : ccctt : ccctt : ccctt : ccctt : ccctt : ccctt : ccctt : ccctt : ccctt : ccctt : ccctt : ccctt : ccctt : ccctt : ccctt : ccctt : ccctt : ccctt : ccctt : ccctt : ccctt : ccctt : ccctt : ccctt : ccctt : ccttc / ccttc / ccttc / ccttc / ccttc / ccttc / ccttc / ccttc / ccttc / ccttc / ccttc / ccttc / ccttc / ccttc / ccttc / ccttc / ccttc / ccttc / ccttc / ccttc / ccttc / ccttc / ccttc / ccttc / ccttc / ccttc | PATTEN 13333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333
ap(config)# multicast-snoop
ap(config)# no multicast-snoop
ap(config)# save
ap(config)# wireless radio 1
ap(config-radio-1)# multicast-to-unicast
ap(config-radio-1)# multicast-to-unicast mode 802.3
ap(config-radio-1)# multicast-to-unicast mode amsdu
ap(config-radio-1)# multicast-to-unicast exclude-list 224.0.0.1
ap(config-radio-1)# show wireless radios multicast-to-unicast

RADIO BAND MC2UC MC2UC-MODE EXCLUDE-LIST

radio1 2.4GHz NO amsdu
radio2 5GHz YES amsdu
ap(config-radio-1)# 

Boot loop detection

When an AP turns off thrice due to a power outage, the radios are turned off automatically with message—WLAN Radios not active when enabled due to power boot loop detection. Reboot to reactivate.

After one hour, the AP automatically restarts and the radios turn on as expected. However, if the be recovered before this duration, the Administrator must manually restart the AP.

This feature is enabled, by default. To disable this feature, configure the following CLI command in AP Groups >User Overrides section in cnMaestro:

!
no power bootloop
! 

Auto-RF

This topic contains the following sections:

  • Overview
    • Dynamic Channel
  • Dynamic Power
  • Auto-RF
    • Auto-RF Rx Sensitivity
  • Configuring Dynamic Channel
  • Configuring Dynamic Power
  • Radio Configuration

Overview

Auto-RF allows APs to obtain various RF statistics and utilize them to provide wireless clients with environment by choosing the proper channel and transmitting power to each radio. This results in application performance and improved quality of calls for the end user.

Auto-RF consists of the following two functionalities:

  • Dynamic Channel—Enables radios to choose the best channel both at device turn on and subsequently if the channel or RF conditions change.
  • Dynamic Power—Aids radios in determining the proper transmit power to deal with coverage gaps and reduce RF interference.

Dynamic Channel

Channel selection by APs can involve any of the following methods:

• Auto Channel Selection (ACS)
• Dynamic Channel Selection (DCS)

Auto Channel Selection (ACS)

Auto-RF runs independently on each device in a deployment. You can enable the feature in all th (2.4 GHz,5 GHz, and 6 GHz (if AP supports). In 2.4 GHz, channels 1, 6, and 11 are considered selection. AP continuously executes the Continuous Background Scan (CBS) to collect samples and fe them to the ACS to choose the best channel based on the channel score. The packet queue is the RF is monitored continuously to ensure that high priority traffic is delivered before starting the is performed so that the device avoids background scan while voice and video traffic is transmitted scan is split into multiple slots to avoid diverting from the operating channel for a longer duration affect the performance of the AP.

Dynamic Channel Selection (DCS)

If the environment has lot of Wi-Fi interference or high packet error rate, Dynamic Channel Selectic takes over and initiates Packet Error Rate (PER) and Channel Utilization (CU) based channel switch. The AP monitors the error rate and Wi-Fi interference to see whether the threshold is crossed to channel switch. The AP sends the channel switch announcement in a beacon before any channel ch occurs.

Dynamic Power

In multi-AP deployments, APs must automatically determine the cell size (coverage area), that is, increase transmit power to ensure the following:

  • There are no coverage gaps—Increase transmit power
  • There is no interference because of overlapping APs. Overlapping of APs creates interference and clients roam between multiple APs if they see more than one AP with a good transmit power Decrease transmit power

Packets and scan results from CBS are parsed and neighbor entries are created which contains data their transmission power and their neighbors. Periodically this data is processed and categorized to how neighbors have seen their SNR.

Auto-RF behavior on device turn on

When the AP turns on the first time, it performs an initial scan (for about 0-300 seconds) to se operating channel. During this scan, CBS collects samples. The AP remains on the selected channel one of the following scenarios occur:

• channel hold time expires
- configuration changes
• the radio restarts

After the hold time expires, the AP reinitiates the ACS algorithm to reassess and choose a new based on collected samples. If the current channel still has the highest score, it is retained. In ca

configuration changes or radio restarts, the collected samples are reset, but historical data remains, CBS to automatically collect fresh samples.

Auto-RF Rx Sensitivity

When APs are depolyed close together, it leads to overlapping APs and co-channel interference. In scenarios, the clients may connect to distant APs instead of the nearby ones that have the best Auto Power feature helps reduce transmit power to minimize the overlapping APs issue, but does it completely fix it.

The Auto-RF Rx sensitivity feature ensures the clients connected to distant APs are disconnected by repeated radio connection retries and failed acknowledgements. The feature also ensures that the client connect only to nearby APs.

This feature is available only as CLI command that you can configure in the AP Groups > User Overrides section in cnMaestro. A sample configuration snippet is shown below:

!  
Wireless radio 1  
auto-rf dynamic-power rx-sens  
auto-rf dynamic-power rx-sens-min-threshold -80  
! 

Configuring Dynamic Channel

Dynamic channel configuration is achieved by the following methods:

  • ACS method
  • DCS method

ACS method

In the ACS method, to enable auto-RF Dynamic Channel in the cnMaestro UI, complete the followir

  1. Go to Configuration > Wi-Fi Profiles > AP Groups page.
  2. Click Add New.
  3. Associate an existing WLAN and configure other AP group parameters.
  4. Click Radio on the left menu.
  5. In the required radio band tab, expand the Auto-RF section.
  6. In the Dynamic Channel tab, select the Enable check box.

Cambium Networks XE5-8 - ACS method - 1

Once Auto-RF Dynamic Channel is enabled, ACS runs at regular intervals based on the Samples and Channel Hold Time, or the Enable time range for Auto-RF configuration parameters. For information on these parameters, see Configuring the Radio.

DCS method

DCS configuration helps in avoiding instances when there is a spike in packet error rate (PER) or Busy. The following are the default configuration parameters and their values:

• DCS trigger threshold—80%

CLI command—auto-rf dynamic-channel dcs-trigger-threshold

• DCS monitor interval—10 minutes

CLI command—auto-rf dynamic-channel dcs-monitor-interval

Both these parameters are available only as CLI commands that you can configure in the AP Groups > User Overrides section in cnMaestro.

AP Groups > Add New Basic Advanced configuration settings entered below will be applied on top of the AP Group settings sent to the device. This allows you to apply configuration not supported in the previous screens. If there are conflicts, the below settings will take precedence. The format used is the same as a configuration file exported from the device via its web UI or the "View Device Configuration" link in the device level configuration page. Basic Management Variables and Macros Radio Settings entered are not validated or error-checked (However, dollar (), period () or space characters are not allowed in a volatile name and it should not be more than 64 characters long), and they may overwrite configuration made in previous screens, so please use them with caution. You are responsible for ensuring the resulting AP Group is valid and safe to use. Network Access Control Services 1 userless radio 2 auto if dynamic channel data monitor interval 10 auto if dynamic channel data figures threshold 60 User-Defined Overlides

Consider a scenario where the device detects that the PER or Congestion threshold is exceeded for period in a day. If the threshold breach occurred because of a spike in PER or Congestion, the change the channel. You can avoid this scenario by configuring the DCS threshold and monitor into. When configured, the AP switches to a different channel if the PER or Congestion threshold is broken continuously for the DCS duration and if the percentage of the breach exceeds the DCS threshold. enabled if either Channel Utilization (CU) or Packet Error Rate (PER) parameter is enabled.

Packet Error Rate (PER)

Consider a scenario where an AP must switch channels if the PER is more than 30% in a 10 min. The AP monitors the PER, and if it exceeds 30% (default threshold) for 80% of the samples in a interval, it will initiate a channel switch. However, when the PER threshold is breached, other config such as sampling, channel hold time, and intervals are overridden. With the default DCS threshold interval configured, Auto-RF manages the channel switch when the above conditions are met. Hence, AP changes channels if the PER remains consistently high (above 30% ) for most of a 10-minute period

Packet Error Rate Threshold 30 Configure packet error rate threshold in %(10-90) Number of Packet Error Rate samples 40 Configure number of packet error rate samples, needed to trigger a channel switch (1-120)

Congestion channel switch

Consider a scenario where an AP must switch channels if the channel utilization exceeds a threshold (default) in a 10-minute interval. The AP monitors channel utilization, and if it exceeds 70% (default for 80% of the samples in a 10-minute interval, it will initiate a channel switch. However, when the threshold is breached, other configurations, such as sampling, channel hold time, and intervals are overridden. With the default DCS threshold and interval configured, Auto-RF will handle the channel when the above conditions are met. Hence, the AP changes channels if channel utilization remains consistently high (above 70%) for most of a 10-minute period.

Channel Utilization Enable channel change using the channel efficiency Channel Utilization Threshold 70 Configure Channel Utilization threshold in %(30-100) Number of Channel Utilization samples 100 Configure number of Channel Utilization samples, needed to trigger a channel switch(5-300)

Configuring Dynamic Power

To enable auto-RF Dynamic Power in the cnMaestro UI, complete the following steps:

  1. Go to Configuration > Wi-Fi Profiles > AP Groups page.
  2. Click Add New.
  3. Associate an existing WLAN and configure other AP group parameters.
  4. Click Radio on the left menu.
  5. In the required radio band tab, expand the Auto-RF section.
  6. In the Dynamic Power tab, select the Enable check box.

Mode Selection Dynamic Channel Dynamic Power Enable Enable Dynamic Power management By-Channel By-Band Set dynamic power mode by channel / by-band

Dynamic Power can be configured in the following two modes:

- By-Band: Considers neighbor APs across all channels of same band for operating Auto-RF dynam transmit power.

This is the default option in the Dynamic Power configuration.

- By-Channel: Considers only operating channel neighbor APs (that also within the same AP group) for operating Auto-RF dynamic transmit power.

When Auto-RF Dynamic Power is enabled, by default, CBS runs in the background with a 50% ov threshold between APs. The default minimum transmit power is set to 8 dBm. The dynamic-power cannot reduce the transmit power below this level, even if there is overlap in AP signals. The Minimum

Neighbor Threshold parameter defines the minimum number of neighboring APs required to enable dynamic power selection.

With Auto-RF Dynamic Power enabled, the system manages transmit power while maintaining a minim level and considering AP overlap and neighbor requirements.

By-Channel By-Band Set dynamic power mode by-channel / by-band Maximum Transmit Power 30 Maximum transmit power that the AP can assign to a radio when adjusting automatic cell sizes. (5-30) dBm Minimum Transmit Power 8 Minimum transmit power that the AP can assign to a radio when adjusting automatic cell sizes. (5-20) dBm Minimum Neighbour Threshold 2 The Minimum number of neighbors to consider for power reduction by autocell logic. (1-10) Cellsize Overlap Threshold 50 Cell overlap that will be allowed when the AP is determining automatic cell sizes (0-100) %

Radio Configuration

For Auto-RF feature to function correctly, the following configuration is recommended:

  • Basic section
    • Channel Scan section

Basic section

Configure the following parameters in the Radio > Basic section with the recommended values:

  • Channel—Auto
    • Transmit Power—Auto
  • Channel Width—20, 40, 80, or 160 MHz based on the deployment
    • Candidates Channel—All.

If you want to restrict the APs to operate on specific channels, you must configure the required channels.

Basic Status Enabled Disabled Enable/Disable operation of this radio Channel Auto Only 'Auto' value is allowed. Configure static channel under the 'Advanced Settings' section available on the Access Point level configuration page Learn more Candidate Channels All Candidate channels is a list of channels on which AP can operate. List of channels depend on the band and country. Channel Width 20 Operating width of the channel Transmit Power Auto Radio transmit power in dBm (4 to 30; subject to regulatory limit) ①

Channel Scan section

Configure the following parameters in the Radio > Channel Scan section with the recommended values:

  • Select the Continuous Background Scan (CBS) option—Selected by default.
  • Wait Time in minutes
    • Rest Time, Dwell Split Time, and Dwell Rest Time in milliseconds
  • Select the Channel Switch Announcement check box to enable the AP to send notifications before any channel change.

Channel Scan Off Channel Scan Continuous Background Scan None Enable/Disable operation of this radio Continuous background scan (CBS) reduces the dwell time, controls the channel switches and also monitors the voice data queues. Rest Time 6 Rest Time — interval between scans on different channels (5-15 seconds). Wait Time 2 Configure wait time in minutes to wait after all channels are scanned and before starting a new scan (1-10 minutes) Dwell Split Time 25 Configure dwell split time to spend on foreign channel Dwell Rest Time 100 Configure time interval between scans on same channel (100-1000 milliseconds) Channel Switch Announcement Use channel switch announcement as a part of channel change

Configuring the Wireless LAN

This chapter describes the following topics:

  • Overview
  • Configuring the WLAN parameters
  • Link Aggregation Control Protocol (LACP)
    • RADIUS attributes
    • Enterprise PSK (ePSK)
    Configuring ePSKs
    ePSK registration for WPA3 clients
  • Creating a Personal Wi-Fi ePSK
    • RADIUS-based ePSK
    • Groupwise Transient Key (GTK) per VLAN
    • Dynamic ARP Inspection

Overview

Enterprise Wi-Fi AP devices support up to 16 unique WLANs. Each of these WLANs can be config the customer requirement and type of wireless station.

Configuring the WLAN parameters

To configure WLAN parameters, complete the following steps:

  1. Navigate to Configuration > Wi-Fi Profiles > WLANs page.

  2. Click Add and select Enterprise Wi-Fi from the Type drop-down list.

Following are the configurable parameters under the WLAN profile:

  • Basic
  • Radius Server
  • Guest Access

  • Internal Access Point
    External Hotspot
    cnMaestro

  • Usage Limits

  • Scheduled Access
  • Access
  • Passport

Basic

Table 23 lists configurable fields that are displayed in the WLANs > Basic Settings section.
Table 23 Basic parameters

ParametersDescription Range Default
WLAN > Basic Settings
Enable Enables a WLAN profile. Once enabled, a Beacon is broadcasted with the SSID and the corresponding parameters configured in WLAN profile.casted in a
SSID Uniquenetwork name that wireless stations scan and associate. - -
Mesh This parameter is required when a WDS connection is established with Enterprise Wi-Fi devices. This parameter supports following options:Base: A WLAN profile configured with a mesh-base will operate as a normal AP. Its radio will beacon on startup SSID can be seen by radios configured as mesh clients.Client: A WLAN profile configured with mesh-client will scan all available channels on startup, looking for a mesh-base to connect.Recovery: WLAN profile configured as mesh-recovery will broadcast a pre-configured SSID upon detection of mesh link failure after a successful connection. This needs to be exclusively configured on a mesh-base device. Mesh client will auto scan for mesh-recovery SSID upon failure of mesh link.Off: Mesh support disabled on WLAN profile.the will scan all available channels on startup, looking for a mesh-base to connect.will broadcast a pre-configured SSID upon detection of mesh link failure after a successful connection. This needs to be exclusively configured on a mesh-base device. Mesh client will auto scan for mesh-recovery SSID upon failure of mesh link.
VLAN Segregates wireless station traffic from AP traffic in the network. Wireless stations obtain an IP address from the subnet configured in the VLAN field of the WLAN profile.W4094 1
Security Determines key values that are encrypted based on the algorithm. Following security methods are supported:OpenThis method is preferred when Layer 2 authentication is built into the network. With this configured on an Enterprise Wi-Fi AP device, any wireless station will be able to connect.OSENThis method is extensively used when Passport 2.0 is enabled on Enterprise Wi-Fi AP devices. If Passport 2.0 is disabled, this security plays no role in wireless station association.OWE (Enhanced Open)This method ensures the communication between each pair of endpoints is protected from other endpoints.WPA2 Pre-Shared KeysThis mode is supported with AES and TKIP encryption. WPA-TKIP can be enabled from the CLI with the allow-tkip CLI option.Cambium Networks XE5-8 - Basic - 1 Note6 GHz clients connect to the AP using the secure Simultaneous Authentication of Equals (SAE) method.WPA2 EnterpriseThis security type uses 802.1x authentication to associate wireless stations. This is a centralized system of authentication methods.WPA2/WPA3 Pre-shared KeysWPA3 comes with a transition mode where WPA2-only capable clients can connect to SSID. WPA2-only capable clients connect using the older PSK method while WPA3 capable clients connect using a more secure SAE method.selectOptech
WPA3 Pre-shared KeysWPA3 replaces the Pre-Shared Key (PSK) exchange with SAE of Equals, which is more secure and provides forward-secrecy as well as resistance to offline dictionary attack.Cambium Networks XE5-8 - Basic - 2NoteWhen you select WPA2/WPA3 Pre-shared Keys or WPA3 Pre-shared Keys, you can enable registration flow for WPA3 clients.To enable the registration flow, you must create an ePSK passphrase and follow the procedure for the clients to undergo the registration flow.For more information, see ePSK registration for WPA3 clients.
WPA3 EnterpriseWPA3 also introduces Enterprise AES CCMP encryption. This level of security provides consistent cryptography and eliminates the mixing and matching of security protocols that are defined in the 802.11 standards.WPA3 Enterprise CNSAWPA3 also introduces a 192-bit cryptographic security suite. This level of security provides consistent cryptography and eliminates the mixing and matching of security protocols that are defined in the 802.11 standards. This security suite is aligned with the recommendations from the Commercial National Security Algorithm (CNSA) Suite and is commonly used in high-security Wi-Fi networks in government, defense, Finance, and industrial verticals.User Pre-shared keysThe U-PSK (User-PSK) Authentication settings are only used in conjunction with XMS Cloud's EasyPass Onboarding Portals. The Cloud automatically configures this setting for an WLAN when you create an Onboarding portal and you assign that WLAN to the portal. Thus, you should not normally change this setting manually. Note that the User-settings are only available on the WLAN profile.SSID can be configured to be transmitted as per the deployment requirement. For a regular access profile, available to configure transmit mode of SSID:2.4 GHz5 GHz6 GHzNoteWhen you select WPA2/WPA3 Pre-shared Keys or WPA3 Pre-shared Keys, you can enable registration flow for WPA3 clients.To enable the registration flow, you must create an ePSK passphrase and follow the procedure for the clients to undergo the registration flow.For more information, see ePSK registration for WPA3 clients.- all options are
Band Each
Client IsolationEnable this feature when there is a need for restriction of wireless station-to-station communication across the network or on an AP.Cambium Networks XE5-8 - Basic - 3NoteFor client isolation to work correctly, it is recommended that clients obtain their IP addresses through DHCP.You must manually update the default gateway addresses in the IP configuration of clients that are using static IP addresses.If the gateway MAC address changes due to hardware replacement or any other reason, you must restart the AP for the AP to learn the new gateway MAC address and to make sure the client isolation functions correctly.The following options are available to configure based on requirement:DisableThis option when selected disables the client isolation feature. that is, any wireless station can communicate to other wireless stations.LocalThis options when selected enable the client isolation feature. This option prevents wireless station communications connected to the same AP.Network WideThis options when selected enable the client isolation feature. It prevents wireless stations communications connected to different AP deployed in the same Cambium Networks XE5-8 - Basic - 4Note• Network-wide mode is not supported Redundancy Gateway protocol is used on deployment.• In the Redundancy Gateway case, Network-wide static can be used to a list of Gateway MAC addresses.onL2 network.whenonprovide
• Network Wide StaticThis option when configured enables client isolation feature across the network. Wireless stations can communicate only to statically added MAC list. Communication to rest other MAC addresses are blocked.
[57A]NoteWhen Network Wide and Network Wide are selected, the user has the provision to add the whitelist MAC addresses to allow the communication. A maximum of 64 MAC addresses can be added.Static
cnMaestro Managed RoamingProvision to enable centralized management of roaming wireless clients through cnMaestro.-for-
Hide SSIDThis is the basic security mode of a Wi-Fi device. This disabler when enabled, will not broadcast SSID.Disabler
Session TimeoutThis field applies to all wireless clients connected to When a wireless station connects, a session timer is Once session time expires, the wireless station must either re-authentication or re-association based on the the wireless station. By default, it is enabled.60e SSID.60130ed.undergo state of session28800
Cambium Networks XE5-8 - Basic - 5NoteFollowing priority takes precedence for the timeout:
ParametersDescription Range Default
a. Configured from the RADIUS serverb. Configured from the AP
Inactivity TimeoutInactivity timer triggers whenever there is no communication between Enterprise Wi-Fi AP device and wireless station associated to Enterprise Wi-Fi AP device. Once the timer reaches the configured Inactivity timeout value, APs send a de-authentication to that wireless station. By default, it is enabled.60en288001800
Cambium Networks XE5-8 - Basic - 6NoteFollowing priority takes precedence for the timeout:a. Configured from the RADIUS serverb. Configured from the APinactivity

Figure 16 Basic parameters
WLANs > Add New WLAN AAA Servers Guest Access Access Control Passpoint ePSK Basic Settings SSID Enable SSID* The SSID of this WLAN (up to 32 characters) Mesh O1 Mesh Base/Client/Recovery mode VLAN* 1 Default VLAN assigned to clients on this WLAN (1-4094) Security Open Set authentication and encryption type Transition SSID Configure the matching open/owe transition SSID Band 2.4 GHz 5 GHz 6 GHz Define radio types (2.4 GHz, 5 GHz, 6 GHz) on which this WLAN should be supported Client Isolation Disable When selected, it allows wireless clients connected to the same AP or different APs to communicate with each other in the same VLAN cnMaestro Managed Roaming Enable centralized Guest Access Session management of roaming for wireless clients through cnMaestro Hice SSID Do not broadcast SSID in beacons Advanced Settings Save Close

Table 24 WLAN (Max clients) parameters

Number of clients2.4 GHz 5GHz 6 GHzConcurrent
XV3-8 512 1024* NA1536
XE5-8 512 1024* 1024** 2560
XV2-2 512 512 NA1024
XV2-2T0 512 512 NA1024
XV2-2T1 512 512 NA1024
XE3-4 512 512 5121536
XE3-4TN512 512 5121536
XV2-21X128 128 NA256
XV2-23T128 128 NA256
XV2-22H128 128 NA256
e410/e430 and e510256256NA 256
e600 and e700512 512NA 512
X7-35X256256256768

* Two 5 GHz radios are available in Single Band Simultaneous (SBS) mode.
** Two 6 GHz radios are available in XE5-8 platform.

Maximum wireless client

At present, the WLAN profile provides an option to configure the maximum wireless clients association limit. This configuration limits the maximum number of clients per SSID per radio. For example, if a user configures the maximum wireless client as 10, on a device capable of 2.4 GHz and 5 GHz radios, the total number of clients that can be associated is 10 across each radio. This has been enhanced in Release 6.5 to set the maximum clients limit per SSID irrespective of the number of radios to which SSID has been mapped.

Maximum clients per device

Most customers commonly use more than a single SSID. They prefer to set the maximum number of wireless clients connection per device, that is, irrespective of the number of WLAN profiles and the number of radios, the maximum number of clients that can be associated is equivalent to the value configured for the parameter max-clients. This is a global configuration.

CLI configuration:

ap(config)# max-clients
0|<1-1536> '0' disables max client per device 

Maximum clients per SSID

This option helps to limit the number of wireless clients connected to a WLAN profile (SSID) irresp the number of radios. This configuration is supported at the WLAN level. This can be enabled as

CLI configuration:

ap(config)# wireless wlan 1
ap(config-wlan-1)# enforce-max-clients-per-ssid 

Maximum clients per SSID per radio

This is the default configuration of the device. This configuration limits the maximum number of client SSID per radio. For example, if a user configures the maximum wireless client as 20, on a device 2.4 GHz and 5 GHz radios, the total number of clients that can be associated is 20 across each configuration is supported at the WLAN level.

CLI configuration:

ap(config)# wireless wlan 1
ap(config-wlan-1)# max-associated-clients
<1-1536>

The default priority order can be:

  1. Per device (Global limit)
  2. Per SSID and (enforce at SSID level)
  3. Per SSID per radio basis (present default option)

To keep backward compatibility with the existing deployments, the default option can be Per SSID basis.

Opportunistic Wireless Encryption (OWE)

OWE is a Wi-Fi standard, which ensures that the communication between each pair of endpoints is protected from other endpoints. The OWE transition mode allows OWE-capable STAs to access the in OWE authentication mode. The OWE transition mode is implemented as follows:

You must create two WLANs on an AP.

For example,

  1. WLAN-1:

open authentication

owe-transition-ssid: Provides WLAN-2 owe security SSID

2. WLAN-2:

owe authentication

owe-transition-ssid: Provides WLAN-1 open security SSID

CLI configuration:

ap(config-wlan-1)# owe-transition-ssid
owe-transition-ssid : Configure the matching open/owe transition ssid 

Cambium Networks XE5-8 - CLI configuration: - 1

Note

The OWE transition mode SSIDs do not apply to 6 GHz radios.

Table 25 Advanced parameters

ParametersDescription Range Default
WLAN > Advanced
VLANPoolingThis parameter is required when a user requires to distribute and receives across multiple subnets. Different modes of VLAN pooling is supported by Enterprise Wi-Fi AP devices, based on infrastructure available at the deployment site. Modes supported are as follows:DisabledThis feature is disabled for this WLAN.Radius BasedThe user is expected to configure WPA2 Enterprise mode to support. During the association phase, AP pool name from RADIUS transaction and based on distribution of wireless station across VLANs, AP selects appropriate VLAN and wireless station requests an IP address from the VLAN selected by Enterprise Wi-Fi AP device.StaticFor this mode to support, the user requires to configure VLAN Pool details available under Configure > Network > VLAN pool. During the association phase, AP obtains pool, and based on the present distribution of wireless station across VLANs, AP selects appropriate VLAN and wireless station requests an IPv4 address from the VLAN selected by the Enterprise Wi-Fi AP device.Disabilitiesas follows:for this obtains the presentIP address
ParametersDescription Range Default
Max ClientsThis specifies the maximum number of wireless stations associated with a WLAN profile. This varies based on Wi-Fi AP device model number.Refer to Table 24 for Tmore details.1512 can 256e(Refer Enterprise details.
UAPSD When enabled, Enterprise Wi-Fi AP devices support WMM PowerDisabled Save / UAPSD. This is required where applications such as VOIP Calls, Live Video streaming are in use. This feature helps to prioritize traffic. Below is the default traffic priority followed by Enterprise Wi-Fi AP device.PowerDisabled VoIP the
the
QBSS When enabled, appends QBSS IE in Management frames. This- IEDisabled provides information on channel usage by AP, so that smart wireless stations can decide better AP for connectivity. Station count, Channel utilization, and Available admission capacity are the information available in this IE.
DTIM interval This parameter plays a key role when power save supported mobile stations are part of the infrastructure. This field enabled controls the transmission of Broadcast and Multicast when enabled controls the transmission of Broadcast and Multicast frames.
Monitored Host
Host This feature is required where there is an interrupted backbone network. Enterprise Wi-Fi AP device monitors the reachability of hostname/IP configured in this parameter and modifies the state WLAN.Disabled of
Interval The frequency of monitoring the network health based on the status of the keep-alive mechanism w.r.t configured monitored host.300 sec
Attempts The number of packets in the keep-alive mechanism to determine the status.
DNS Logging By enabling this feature, the Administrator can monitor websites accessed by wireless stations connected to WLAN profile.the Disabled LAN profile.
ParametersDescription Range Default
Connection Logging HostWhen enabled provides information of all IP connections by a wireless station that is associated with WLAN and logs connection data seamlessly onto an external syslog server.accDisabled the
Band SteeringThis feature when enabled steers wireless stations to connected 5GHz. There are three modes supported by Enterprise devices. The mode can be selected based on either wireless station type. Below is the order of modes, which forces the wireless station to connect to the 5 GHz band.LowNormalAggressiveconnDisabled Wi-Fi deployment or
Proxy ARPProvision to avoid ARP flood in a wireless network. When Enabled, AP responds to ARP requests for the wireless stations that AP. This is for IPv4 infrastructure.connected to
Proxy NDWhen enabled, AP responds to IPv6 Neighbor Discovery (ND) requests for the wireless stations connected to that AP.
Unicast DHCPProvision to transmit DHCP offer and ACK/NACK packets – enabled Unicast packets to wireless stations.
Insert DHCP Option 82When enabled, DHCP packets generated from wireless that are associated with APs are appended with Option 82 parameters. Option 82 provides a provision to append and Remote ID. Following parameters can be selected Circuit ID and Remote ID:HostnameAP MACBSSIDSSIDVLAN IDSITEIDCustomAllstationDisabled Circuit ID in both
ParametersDescription Range Default
Cambium Networks XE5-8 - Note - 1NoteIn case DHCP Option 82 is configured at the device-,WLAN profile-, and L3 interface-levels, the following priority order is considered:1. Device-level configuration2. WLAN profile-level configuration3. L3 interface-level configuration
Tunnel ModeThis option is enabled when user traffic is tunneled to network either using L2TP or L2GRE.to DisableDMZ
Fast-Roaming ProtocolOne of the important aspects to support voice applications Disabled Wi-Fi network (apart from QoS) is how quickly a client can move its connection from one AP to another. This should be less than 150 ms to avoid any call drop. This is easily achievable when the WPA2-PSK security mechanism is in use. However, in enterprise environments, there is a need for more robust security (the one provided by WPA2-Enterprise). With WPA2-Enterprise, the client exchanges multiple frames with the AAA server, and hence depending on the location of the AAA server the roaming time will be above 700 ms.Select any one of the following:OKCThis roaming method is a Cambium Networks proprietary solution to share the client authentication information with other Cambium Networks APs on the same network by sending encrypted information on wire on SSID VLAN. This information sharing does not require cnMaestro so even in cases where AP is not connected to cloud, the roaming will be seamless.802.11rwhen the WPA2-
Fast transition (FT) is an IEEE standard to permit connectivity aboard wireless devices in motion, with secure client transitions from one Basic Service Set (abbreviated BSS, and also known as a base station or more colloquially, an access point) to another, performed in a nearly seamless manner. The terms handoff and roaming are often used, although 802.11 transition is not a true handoff/roaming process in the cellular sense, where the process is coordinated by the base station and is generally uninterrupted.continuous fast and
RRM (802.11k)AP sends the SSID name of the neighbor APs (SSID - c-Disfected on multiple APs) to 802.11k clients.The following parameter must be enabled:Enable RRM-
802.11v Provision to enable 802.11v BSS Transition Management. - Disabled
PMF(802.11w)802.11w also termed as Protected Management Frames Service, defines encryption for management frames. Unen encrypted to DoS management frames make wireless connection vulnerable attacks as well as they cannot protect important information exchanged using management frames from eavesdroppers(PMF)Optional
SA QueryRetry TimeThe legitimate 802.11w client must respond with a Secu#0-500 Association (SA) Query Response frame within a pre-defined amount of time (milliseconds) called the SA Query Retry time.100ms
Association ComebackTimeThis value is included in the Association Response as an Association Comeback Time information element. AP will deny association for the configured interval.1-20 1Sec

Figure 17 Advanced parameters
WLANs > Add New WLAN Advanced Settings Maximum Clients 127 Maximum number of clients assigned per Radio (1-512) Guest Access VLAN Pooling Disabled Configure VLAN Pooling Session Timeout 28800 Session time in seconds (60 to 604800) Inactivity Timeout 1900 Inactivity time in seconds (60 to 28800) Drop Multicast Traffic Drop the send/receive of multicast traffic UAPSD Enable WMM Power Save/UAPSD (for VoIP and streaming) QBSS Append QBSS Load IE in management frame to improve AP selection DTIM Interval 1 Configure Delivery Traffic Indication Message (1 - 255 beacon count) Monitored Host Host IP Address or Hostname that should be reachable for this WLAN to be active Interval 300 Duration in seconds (60-3600) Attempts 5 Number of attempts to check the reachability of monitored host (1-20) DNS Logging Host Port 514 Syslog server where all client DNS requests will be logged Connection Logging Host Port 514 Syslog server where all client connection requests will be logged Band Steering Disable Steer clients across all Bands. Proxy ARP Respond to ARP requests automatically on behalf of clients Proxy ND Respond to IPv6 Neighbor Discovery (ND) requests automatically on behalf of clients Unicast DHCP Convert DHCP-OFFER and DHCP-ACK to unicast before forwarding to clients Insert DHCP Option 82 Enable DHCP Option 82 Tunnel Mode Enable tunneling of WLAN traffic over configured tunnel Fast Roaming Protocol OKC 802.11v Configure roaming protocol (not applicable when authentication type is Open) RRM (802.11k) Enable Radio Resource Measurements (802.11k) 802.11v Enable 802.11v BSS Transition Management

Band steering also supports client load balancing based on the below CLI configuration:

ap(config)# wireless wlan 1
ap(config-wlan-1)# band-steer-load-balancing
client-counts : client counts for band steer to consider clients load balancing
client-percentage : Client percentage for band steer to consider clients load balancing 

WLAN VLAN allowed list

This is an optional CLI to configure the allowed VLAN list upfront. It is needed in multiple VLAN such as Dynamic VLAN, ePSK-based VLAN, and RADIUS VLAN.

CLI configuration:

ap(config)# wireless wlan 1
ap(config-wlan-1)# vlans-allowed
{vlan_list} <e.g 1-10,15,100>
ap(config-wlan-1)# vlans-allowed 1-10 

ICMPv6 Router advertisement (RA) unicast conversion

Convert ICMPv6 RA Multicast packets to Unicast for all stations. ICMPv6 RA unicast conversion is r multiple VLAN scenarios such as Dynamic VLAN, ePSK-based VLAN, and RADIUS-based VLANs.

This CLI configuration allows to configure the VLANs where ICMPv6 RA unicast conversion is neede

CLI configuration:

ap(config)# wireless wlan 1
ap(config-wlan-1)# ipv6-router-advertisement-unicast
vlans : Configure vlans where IPV6 Router Advertisement unicast conversion needed
ap(config-wlan-1)# ipv6-router-advertisement-unicast vlans
{vlan_list} <e.g 1-10,15,100>
ap(config-wlan-1)# ipv6-router-advertisement-unicast vlans 1-10 

802.11k/v

802.11k

Radio Resource Measurement (RRM) defines and exposes radio and network information to facilitate management and maintenance of a wireless network. 802.11k is intended to improve the way traffic distributed within the network.

The client can request a neighbor report from the AP using the neighbor_report_req management m. The client may request neighbors with matching SSID or request for all neighbors in the vicinity. The AP

collects the neighbor information using proprietary methods and provides the list of neighbors to the in the neighbor_report_rsp message.

802.11v

802.11v is deployed on the APs to govern the wireless networking transmission methods. It allows us and APs to exchange information regarding the network topology, and RF environment. This facilitates wireless devices to be RF-aware for participating in network-assisted power savings and network-assisted roaming methods.

The client may send solicited BSS Transition Management messages to AP before making roaming decisions. The idea is to identify the best APs to roam. The AP, after receiving the message from expected to respond with the best APs in the vicinity to assist the client in roaming. The neighbor information is collected using proprietary methods.

RADIUS server

To configure a RADIUS server, complete the following steps:

  1. Navigate to Configuration > Wi-Fi Profiles WLAN tab, select Radius Server tab and provide the details as given in Table 26:

Table 26 RADIUS Server parameters

Parameters Description Range Default
Authentication ServerProvision to configure RADIUS Authentication server such as Hostname/IPv4, Shared Secret, Port Number and Realm. A maximum of three RADIUS servers can be configured.Cambium Networks XE5-8 - RADIUS server - 1NoteThe Realm parameter can be left blank, you would like to use this server only usernames where the network domain is included.For example, in@cambium.com or/ , the realms @cambium.com and /, and this server will be selected only if the has the appropriate realm.detDisabled and unless for certain username
Accounting ServerProvision to configure Accounting server details such - aDisabled Hostname/IPv4, Shared Secret, Port Number. A maximum of three RADIUS servers can be configured.- aDisabled
Timeout This field indicates wait time period for a response from 1-50e 3 AAA server.
Attempts Parameter to configure many attempts that a device should be 1 send AAA request to server if no response is received within the configured timeout period.
Accounting ModeThis field is enabled based on customer requirements. Disabled accounting packet is transmitted based on the mode selected.Start-StopAccounting packets are transmitted by AP to the AAA server when a wireless station is connected and then disconnects.Start-Interim-StopAccounting packets are transmitted by AP to the AAA server when a wireless station connects and then at regular intervals of configured Interim Update Interval and then when it disconnects.NoneThe accounting mode will be disabled.
Accounting PacketWhen enabled, Accounting-On is sent for every client Disabled connected.
Sync Accounting RecordsProvision to configure accounting records to be synced across neighboring APs.
Server Pool ModeUsers can configure multiple Authorization and Accounting Failover servers. Based on a number of wireless stations, the user can choose Failover mode.Load Balance—AP communicates with multiple servers and ensures that authorization and accounting are equally shared across configured servers.Failover—AP selects the RADIUS server which is up and running based on the order of configuration.
NAS-IdentifierThis is a configurable parameter and is appended in the hostname/RADIUS request packet.System Name
Dynamic AuthorizationThis option is required, where there is CoA request disabled AAA/RADIUS server.Disabled
Dynamic VLANWhen enabled, AP honors the VLAN information provided the RADIUS transaction. Wireless station requests IP from the same VLAN learned through RADIUS.address
Called Station IDThe following information can be communicated to RADIUS server:AP-MACAP-MAC: SITE-NAMEAP-MAC: SSIDAP-MAC: SSID-SITE-NAMEAP-NAMEAP-NAME: SITE-NAMEAP-NAME: SSIDSITE-NAMESSIDCUSTOMthe AP-MAC: SSID

Figure 18 The RADIUS Server parameters
WLANs > Add New WLAN AAA Servers Gues! Access Access Control Passpoint ePSK Warning: AAA Servers are configured separately for each WLAN. Authentication Server 1. Host e.g. xxx.x/ Secret Show Port* 1812 Realm 2. Host e.g. xxx.x/ Secret Show Port* 1812 Realm 3. Host e.g. xxx.x/ Secret Show Port* 1812 Realm Timeout 3 Timeout in seconds for each request attempt (1-30) Attempts 1 Number of attempts before giving up (1-3) Accounting Server 1. Host: e.g. xxx.x/ Secret Show Port* 1813 2. Host e.g. xxx.x/ Secret Show Port* 1813 3. Host e.g. xxx.x/ Secret Show Port* 1813 Timeout 3 Timeout in seconds for each request attempt (1-30) Attempts 1 Number of attempts before giving up (1-3) Accounting Mode None Configure accounting mode Accounting Packet Enable Accounting-On messages Sync Accounting Records Configure accounting records to be synced across neighboring AP's Interim Update Interval 1800 Interval for RADIUS Interim-Accounting updates (10-55535 Seconds) Advanced Settings Server Pool Mode Load Balance Load balance requests equally among configured servers Failover Move down server list when earlier servers are unreachable NAS-Identifier AP-HOSTNAME ▼ NAS-Identifier attribute for use in Request packets (defaults to system name) Dynamic Authorization Enable RADIUS dynamic authorization (COA, DM messages) Dynamic VLAN Enable RADIUS assigned VLANs Called Station ID: AP-MAC-SSID Configure AP-MAC-SSID as Called-Station-Id in the RADIUS packet

Proxy Through Controller

cnMaestro On-Premises can act as a proxy server for a AAA request coming from Enterprise Wi-Fi Points. In this scenario, cnMaestro acts as Network Access Server (NAS) for the AAA server.

The AP sends AAA packets to cnMaestro On-Premises, and cnMaestro forwards them to the AAAs. When the Proxy Through Controller feature is enabled, CoA is supported other than AAA requests.

CLI configuration:

ap(config-wlan-1)# radius-server through-controller 
Note: Applicable only with On-Premises controller 

For activating Proxy Through Controller feature in cnMaestro On-Premises:

  1. Go to Administration > Settings.
  2. Enable RADIUS Proxy checkbox as shown in below figure.

Figure 19 RADIUS proxy
Administration > Settings General Notifications Syslog x Webhooks x Cloud Connectivity PTP 820/850 Advanced Features Instantaneous Offline Alarm Send offline alarms immediately, instead of waiting 5 minutes. This may generate many false alarms due to slow or unstable connections. Lock Wi-Fi AP/cnMatrix device Configuration x Overwrite Wi-Fi AP and cnMatrix configuration changes made outside of a mapped AP Group or Switch Group(such as through the Device UI). ✓ RADIUS Proxy x Enable the "Proxy RADIUS through cnMaestro" feature in WLAN policies (configured at Enterprise WLAN Policy > AAA Servers).

EAP-FAST support

EAP-FAST authentication occurs in two phases. In the first phase, EAP-FAST employs the TLS hands provide an authenticated key exchange and to establish a protected tunnel. Once the tunnel is est the second phase begins with the peer and server engaging in further conversations to establish the required authentication and authorization policies.

Guest Access

Internal Access Point

Below table lists configurable fields that are displayed in the WLANs > Guest Access > Internal Access Point page.

Table 27 Internal Access Point parameters

Parameters Description Range Default
WLAN > Guest Access > Internal Access Point
Enable Enablesthe Guest Access feature. - Disabled
Access PolicyThere are four types of access types provided user:1. ClickthroughThis mode allows the users to get access data without any authentication mechanism. User can access the internet as soon as he is connected and accepts Terms and Conditions2. RADIUSThis mode when selected, the user has to provide a username and password, which is then redirected to the RADIUS server authentication. If successful, the user is provided with data access.3. Local Guest AccountUsers must configure username and password on the device, which has to be provided on the redirection page for successful authentication and data access.- click through to for
Redirect ModeThis option helps the user to configure the HTTPS mode of redirection URL.1. HTTPAP sends an HTTP POSTURL to the associated client, in the http://format.2. HTTPSAP sends HTTPS POSTURL to the success associated client, in the https://format.HTTPTTO
Redirect HostnameUsers can configure a friendly hostname, which - is added to the DNS server and is resolvable to Enterprise Wi-Fi AP IP address. This parameter once configured will be replaced with an IP address in the redirection URL provided to wireless stations.-
Title Users canconfigure a Title to the splash page.Configured text in this parameter will be displayed in the redirection page. This text is usually Bold.Up to 255 charactersWelcome To Cambium Powered Hotspot
Contents Userscan configure the contents of the Splash page using this field. Displays the text configured under the title section of the redirection page.Up to 255 charactersEnter username and password to get Web Access
Terms Splashpage displays the text configured when the user accepts the Terms and Agreement.up to 255 characters-
Logo Displaysthe logo image updated in URL http (s)://logo.png. Either PNG or JPEG format of the logo is supported.--
Background ImageDisplays the background image updated in URL - http (s)://backgroundimage.png. Either PNG or JPEG format of the logo is supported.--
Success ActionProvision to configure redirection URL after successful login to captive portal services. Users can configure three modes of redirection URL:1. Internal Logout PageAfter successful login, the wireless client is redirected to the logout page hosted on AP.2. Redirect user to External URLHere users will be redirected to the URL which is configured on the device in Redirection URL configurable parameter.3. Redirect user to Original URLHere users will be redirected to the URL that is accessed by the user before successful captive portal authentication.Logout page
Redirect user External URLProvision to configure re-direction URL after successful login and additional information of AP and wireless station information can be appended in the URLPREFIX Query Strings in Redirect URLThis option is selected by default. The following information is appended in the redirection URL:SSIDAP MACNAS IDAP IPClient MACRedirection URLUsers can provide either HTTP or HTTPS URL-
Redirection user to Original URLUsers will be redirected to the URL that is accessed by the user before successful captive portal authentication.There are additional parameter Prefix Query Strings in Redirection URL that is enabled by default and details given below:Prefix Query Strings in Redirect URLThis option is selected by default. The following information is appended in the redirection URL:SSIDAP MACNAS ID-
Success messageProvision to configure the text to display upon - successful Guest Access authentication. This is applicable only when Success Action mode is Logout Page.Internal-
RedirectIf enabled, only HTTP URLs will be redirected, enabled the Guest Access login page.If disabled, both HTTP and HTTPS URLs will be redirected to the Guest Access login page.-
Redirect User PageIPv4 address configured in this field is used URL for Guest Access sessions.as 1log but
Proxy Redirection PortThe proxy port can be configured with which server is enabled. This allows URLs accessedport to be redirected to the login page.1proxy65535 with proxy-
Session TimeoutThis is the duration of time, the client will access the internet if quota persists, after which sends de-authentication. The wireless station has to undergo Guest Access authentication after session timeout.[536C]NoteFollowing priority takes precedence for the session timeout:a. Configured from the RADIUS serverb. Configured from the AP60- allowed259200028800
Inactivity TimeoutProvision to configure timeout period to disconnect wireless stations that are associated but have traffic. AP starts a timer when there is no data received from a wireless station and disconnects when reaches zero.Cambium Networks XE5-8 - Internal Access Point - 1NoteFollowing priority takes precedence for the inactivity timeout:a. Configured from the RADIUS serverb. Configured from the AP60-2592000data received the timer1800
MAC Authentication FallbackIt is a mechanism in which wireless stations redirected to the Guest Access login page after any supported type of MAC address authenticationwill Disabled fails.
Whitelist Provisionon to configure either IPv4 or URLs to bypass-traffic, therefore user can access those IPs or without Guest Access authentication.URLs-

Figure 20 The Internal Access Point parameters
VM-ADL > Active New Health Sub-Servers User Active User Active: Main User Active: User Access Settings • IP Pathway: SubSavers (User) with the best key and complete in the last few nodes • HTTPID: Spotify page with a network and a network tool, which is used to access the Web or via • LDAP: Download page in the target page for authentication log by a PDF server • Local Web Account: Download page in a logarithmic format that provides the total user account IP Service Protocol • HTTP ID: User download HTTP protection on IP server access server • HTTP ID: User download HTTP access to IP plant access server Download History: Download History to the upload page log on 2000 occurrences Type: The text in upload page (type 2000 programming) Contents: Enter components of the upload page (up to 2000 occurrences) Forms: Forms and continues displayed in the second package (up to 2000 occurrences) Login: My Internet access request: Loglets for displayed on the upload page Background Image: My Internet access information: Background Image to be displayed on the upload page Sources: Active Access Page Revised User to Additional URL Revised User to Additional URL Sources Message: Advanced Settings Filing: HTTPID: Update instructions on HTTP document only Documentation Page: 1411 Description Port: Print monitor (http://83555) Session Time: 26:00 Session time to download (3D to 25/24/25) Subscription Time: 99:00 History time to syncs from BICAS CIVI/TSX/TSX MAC Authentication Pathback: Use Google access only as Network for online setting MAC submission Latest Message: Configure the upload code at an extended client's user account Pre-Login Allowed Domains IP Address / Domain Name: Add New Delete and IP address is an Extension Server Recommendation Capture Portal Skipover User Agent Add New Delete User Agent Setting: HTTP Code: HTTP Reply: Delete No User Agent needs recommendation

External Hotspot

Below table lists the configurable fields that are displayed in the WLANs > Guest Access > External Hotspot tab.

Table 28 External Hotspot parameters

Parameters Description Range Default
WLAN > Guest Access > External Hotspot
Access Policy There are four types of access types provided end user:1. ClickthroughThis mode allows users to get access data without any authentication mechanism. The user can access the internet as soon as he is connected accepts the Terms and Conditions.for Clickthroughand
Parameters DescriptionRange Default
2. RADIUSThe user has to provide a username and password, which is then redirected to a RADIUS server for authentication. If successful, the user is provided with data access.3. Local Guest AccountThe user has to configure username and password on the device, which has to be provided on the redirection page for successful authentication and data access.
Redirect Mode Provision to configure the HTTP or HTTPS mode http redirection URL.1. HTTPAP sends an HTTP POSTURL to the associated client, in the http://format.2. HTTPSAP sends an HTTPS POSTURL to the associated client, in the http://format.HTTP
Redirect HostnameUsers can configure a friendly hostname, which is added to the DNS server and is resolvable to Enterprise Wi-Fi AP IP address. This parameter once configured will be replaced with an IP address in the redirection URL provided to wireless stations.-
External Page URLUsers can configure a landing/login page that is posted to wireless stations that are not Guest Access authenticated.-
External Portal Post Through cnMaestroThis is required when HTTPS is only supported disabled external guest access portal. This option when enabled minimizes certification. The certificate is required to install only in cnMaestro On-Premises.
External Portal TypeEnterprise Wi-Fi AP products are supported by standard mode configuration.• Standard
This mode is selected, for all third-party vendors whose Guest Access services are certified and integrated with Enterprise Wi-Fi AP products.
Success Action Provision to configure redirection URL after successful login to captive portal services. User can configure three modes of redirection URL:1. Internal Logout PageAfter successful login, the wireless client is redirected to the logout page hosted on AP.2. Redirect user to External URLHere users will be redirected to the URL which is configured on a device in Redirection URL configurable parameter.3. Redirect user to Original URLHere users will be redirected to a URL that is accessed by the user before successful portal authentication.- Internal User can-Logout Page
Redirect user to External URLProvision to configure re-direction URL after successful login and additional information of wireless station information can be appended URL.- Prefix Query Strings in Redirect URLThis option is selected by default. The following information is appended in the redirection URL:○ SSID○ AP MAC○ NAS ID○ AP IP○ Client MAC○ RedirectionURL○ Users can provide either HTTP or HTTPS URLs.-AP and in the-
Redirection user to Original URLUsers will be redirected to the URL that is- accessed by the user before successful captive portal authentication. There are additional parameter Prefix Query Strings in Redirection URL that is enabled by default and details given below:Prefix Query Strings in Redirect URLThis option is selected by default. The following information is appended in the redirection URL:SSIDAP MACNAS IDAP IPClient MAC-
Success messageProvision to configure the text to display upon successful Guest Access authentication. This is applicable only when Success Action mode is Internal Logout Page.-
Redirection URLQuery StringThe following information is appended in the- Disabled redirection URL, if Prefix Query Strings in URL is enabled.Client IPRSSIAP LocationRedirect
Redirect •If enabled, only HTTP URLs will be redirected Enable the Guest Access login page.If disabled, both HTTP and HTTPS URLs will be redirected to the Guest Access login page.
Redirect User PageThe IP address configured in this field is - used as logout/disconnect/redirect to captive portal URL for Guest Access sessions. The IP address configured should not be reachable to the internet.-
Proxy Redirection PortThe proxy port can be configured with which -pr6535 server is enabled. This allows URLs accessed with proxy port to be redirected to the login page.-
Session TimeoutThis is the duration of time, the client will to access the internet if quota persists, after sends de-authentication. The wireless station undergo Guest Access authentication after session timeout.Cambium Networks XE5-8 - External Hotspot - 1NoteFollowing priority takes precedence for the session timeout:a. Configured from the RADIUSb. Configured from the AP50 - allowed2592000 APhas to server28800
Inactivity TimeoutProvision to configure timeout period to disconnect wireless stations that are associated but have 2592000 data traffic. AP starts a timer when there is no received from a wireless station and disconnects when the timer reaches zero.Cambium Networks XE5-8 - External Hotspot - 2NoteFollowing priority takes precedence for the inactivity timeout:a. Configured from the RADIUSb. Configured from the AP60ect2592000 data data server1800
MAC Authentication FallbackIt is a mechanism in which wireless stations- w disabled redirected to the Guest Access login page supported type of MAC address authentication failures.Cambium Networks XE5-8 - External Hotspot - 3NoteThis feature works only when Guest Access is configured with RADIUS authentication under WLANs > Guest Access > Access Policy > RADIUS.Disabled after any
Extend InterfaceProvision to support the Guest Access on the Ethernet interface.- Disabled

Figure 21 External Hotspot parameters
VoBA > Add Name W.A.M. AAA Server Shared Service Access Control Parameters uFSI Basic Settings □ Basic □ Copy/Proxy □ Internal Access Page □ Common/Protocol Access Policy □ CIRU-Weight: Select Page where you are received (which is required to get on this page) □ ACSLR: Select Page with access and access, authentication, and RACKS sites □ LDAP: Download service to log page the authentication by a TCP server □ Local Account Account: Download user to a webpage page for authentication by local server user account AP Protocol Protoc2 □ HTTP User processed HTTP protocol for AP guest server accounts □ HTTP User transmitted HTTP protocol for AP guest server accounts Selected Processors ■ Reduced Processors for the client's package or 20% accounts □ MSH Clients Extension Server Logis External Page URL □ External Port Path Throughput Measures External Page Type ■ Download ▶ External Port Type Standard/PPP Selected Adapter ■ Interimapped Page ■ Download Link to Extension URL ■ Download Link to Original URL Success Message Advanced Settings Subscriptions URL Display Ship □ Clients IP Include IP of users in the database and query storage □ HTTP: Software download service in the database and query storage □ AP Location: Include IP location in the database and query storage ■ Download □ HTTP-only: Download instructions for HTTP packets only ■ Download User Pages 1011 Configure IP access for downloading user to your portion open page Subscriptions Pcs: Part number (1): 500000 Server Termostat user: Interface server accounts (84 to 10430000) Accessibility Provider: 860 Accessibility Item account (84 to 10330000) MAC Authentication Feedback: User generated only as follows by check using MAC authentication Existing Provider: Configure the interface which is inserted for your session Pre-Login Address Domaine IP Address / Domain Name All IP Address or Common License Available: Capture Portal/Passes User Agent Index User Agent String HTTP Code HTML Reply Options All User Response available

cnMaestro

The following table lists configurable fields that are displayed in the WLANs > Guest Access > cnMaestro page:

Table 29 The cnMaestro parameters

ParametersDescription Range Default
WLAN > Guest Access > cnMaestro
Guest Portal NameProvision to configure the name of the Guest Access which is hosted on CnMaestro.-profile-
Redirect •If enabled, only HTTP URLs will be redirected to Access login page.If disabled, both HTTP and HTTPS URLs will be Guest Access login page.- then ignored redirectedto
Redirect UserThe IP address configured in this field is used asa logoutURL for
Page GuestAccess sessions. The IP address configured should be not reachable to the internet.
Proxy Redirection PortThe proxy port can be configured with which proxy enabled. This allows URLs accessed with proxy port redirected to the login page.server65535 to be-
Inactivity TimeoutProvision to configure timeout period to disconnect wireless stations that are associated but have no data traffic. 2592000ts timer when there is no data received from a wireless station disconnects when the timer reaches zero.Cambium Networks XE5-8 - cnMaestro - 1 NoteFollowing priority takes precedence for the inactivity timeout:a. Configured from the RADIUS serverb. Configured from the AP1800a and
Whitelist Provision to configure either IPs or URLs to bypass traffic, such that user can access those IPs or URLs without Guest Access authentication.-

Figure 22 cnMaestro parameters
WLANs > Configuration Devices WLAN AAA Servers Guest Access Access Control Passpoint ePSK Basic Settings Enable Portal Mode Internal Access Point External Hotspot onMeestro Portal Name: None Advanced Settings Redirect HTTP-only Enable redirection for HTTP packets only Redirect User Page 1111 Configure IP address for redirecting user to guest portal splash page Redirection Port Port number (1 to 85535) Inactivity Timeout 1900 Inactivity time in seconds (60 to 2592000) MAC Authentication: Fallback Use guest access only as fallback for clients failing MAC authentication Extend Interface Configure the interface which is extended for guest access Pre-Login Allowed Domains IP Address / Domain Name Delete No IP Address or Domain Name Available Captive Portal Bypass User Agent Add New Index User Agent String HTTP Code HTML Reply Delete No User Agent rule available

Usage Limits

Below table lists configurable fields that are displayed in the WLANs > Access Control > Usage Limits section.

Table 30 Usage Limits parameters

ParametersDescription Range Default
Rate Limit ClientProvision to limit throughput per client. Default allowed throughput per client is unlimited, that is, maximum allowed by[Unlimited] 802.11 protocols. The traffic from/to each client on an rate-limited in either direction by configuring the client available in usage limits inside the WLAN Configuration. This is useful in deployments like public hotspots where the backhaul is limited and the network administrator would like to ensure that one client does not monopolize all available bandwidth.- 0
Rate Limit WLANProvision to limit throughout across WLAN irrespective number of associated wireless stations to WLAN. All upstream/downstream traffic on an SSID (aggregated across all wireless clients) can be rate-limited in either direction by configuring usage limits inside the WLAN configuration the GUI. This is useful in cases where multiple SSIDs are being used and say one is for corporate use, and another. The network administrator can ensure that the guest is always throttled, so it will not affect the corporateof a cross all by section of VLAN traffic WLAN.[Unlimited] of being guests.

Figure 23 The Usage Limits parameters
WLANs > Add New WLAN AAA Servers Guest Access Access Control Passpoint ePSK Usage Limits Rate Limit per Client Upstream 0 Kbps Downstream 0 Kbps Rate Limit for WLAN Upstream 0 Kbps Downstream 0 Kbps

Scheduled Access

Below table lists configurable fields that are displayed in the WLANs > Access Control > Scheduled Access section.

Table 31 The Scheduled Access parameters

ParametersDescription Range Default
Scheduled AccessProvision to configure the availability of Wi-Fi services selected time duration. Enterprise Wi-Fi AP has the cap-figuring the availability of Wi-Fi services on all days day (s) of a week. The time format is in Hours.00:00ability - of 28r59a Hrs.Disabled specific
[WWYC]Note
ParametersDescriptionRange Default
From release version 6.3 onwards, users are to configure up to a maximum of 12 scheduled rules per day on a particular WLAN instead per day.allowed uled access of one rule

Figure 24 The Scheduled Access parameters
WLANs > Add New WLAN AAA Servers Guest Access Access Control Passpoint ePSK Scheduled Access Sunday Start Time (HH:MM) End Time (HH:MM) Monday Start Time (HH:MM) End Time (HH:MM) Tuesday Start Time (HH:MM) End Time (HH:MM) Wednesday Start Time (HH:MM) End Time (HH:MM) Thursday Start Time (HH:MM) End Time (HH:MM) Friday Start Time (HH:MM) End Time (HH:MM) Saturday Start Time (HH:MM) End Time (HH:MM)

CLI Configuration:

ap(config)# wireless wlan 1
ap(config-wlan-1)# scheduled-access
all : all
friday : friday
monday : monday
saturday : saturday
sunday : sunday
thursday : thursday
tuesday : tuesday
wednesday : wednesday
weekday : weekday
weekend : weekend
ap(config-wlan-1)# scheduled-access all
Time period in HH:MM-HH:MM,HH:MM-HH:MM format 

Access

Below table lists configurable fields that are displayed in the WLANs > Access Control tab.

Table 32 The Access parameters

Parameters Description Range Default
DNS-ACL
Precedence Provision to configure index of ACL rule. Packets are validated and processed based on the Precedence value configured.1
Action Provision to configure whether to allow or deny traffic. - Deny
Domain Provision to configure domain names and rules are applied on Action configured.based-
MAC Authentication
MAC Authentication PolicyEnterprise Wi-Fi AP supports multiple methods of MAC authentication. Following are the details of each mode1. PermitWireless station MAC addresses listed will be allowed to associate to AP.2. DenyWhen the user configures a MAC address, those wireless stations shall be denied to associate and the non-listed MAC address will be allowed.3. RADIUSFor every wireless authentication, AP sends a RADIUS request and if RADIUS acceptance is received, then the wireless station is allowed to associate.In case authentication fails, you can enable AP to assign the default WLAN VLAN to the clients. For this, you must configure the failed-allow-traffic CLI command. For more information, see Fallback to WLAN VLAN when RADIUS-based MAC authentication fails.4. cnMaestroThis option is preferable when the administrator prefers a centralized MAC authentication policy. For every wireless authentication, AP a sends query to cnMaestro if it is allowed or disallowed to connect. Based on the configuration, wireless stations are either allowed or denied.- Deny

To configure DNS ACL:

  1. Select Precedence from the drop-down list.
  2. Select type of action from Action drop-down list.
  3. Enter a domain name in the Domain textbox.
  4. Click Save.

To configure MAC Authentication:

  1. Select MAC Authentication Policy from the drop-down list.
  2. Enter MAC in the textbox.
  3. Enter Description in the textbox.
  4. Click Save.

Figure 25 The Access parameters
WLANs > Add New WLAN AAA Servers Guest Access Access Control Passpoint ePSK Access Control Lists Policy Based ACL ① Policy Based ACLs are supported only by 6.x firmware. These are defined under Wi-Fi Profiles > Access Control Policies. ✓ Enable Access Control Access Control Policy None Legacy ACL ② Legacy ACLs are supported by both 4.x and 6.x firmware. For 6.x APs Policy Based ACLs are recommended. Add New Precede... Policy Direction Type Rule Description Edit Delete No Rule Available MAC Authentication Policy ● Deny ○ Allow ○ RADIUS ○ cnMaestro Add New MAC Description Delete No Rule Available DNS ACL Add New Precedence... Policy Domain Edit De No Rule Available

Sample DNS-ACL configuration

If any user wants to block Facebook or Youtube traffic and allow the rest of the traffic, the cor shown in below figure:

Figure 26 Sample DNS-ACL configuration
WLANs > Ent_Access_Profile_6GHz Configuration Devices WLAN AAA Servers Guest Access Access Control Passpoint ePSK DNS ACL Precedence Policy Domain 1 deny "facebook.com 2 deny "youtube.com 256 permit ** Add New Showing 1: 2 Total: 3 10 * ( Previous 1 Next )

Fallback to WLAN VLAN when RADIUS-based MAC authentication fails

When a client passes RADIUS-based MAC authentication, the RADIUS server assigns the configured \ However, if clients fail the authentication, you can configure the AP to assign the default WLAN \ enables the AP to allow limited access to clients, or redirects the clients to a captive portal page available in the RADIUS MAC authentication list. Once the captive portal authentication is successful, RADIUS server dynamically disconnects the client and assigns the RADIUS VLAN when the clients tr connect later.

To assign the default WLAN VLAN to such clients, you must include the mac-authentication radius failed-allow-traffic CLI command in the AP Groups > User Overrides section in cnMaestro.

This feature is only available for RADIUS-based MAC authentication. The use case for this feature i provide limited access to clients not included in the approved RADIUS MAC authentication list, such granting access to a walled garden, the internet, or redirecting the clients to go through the capti authentication.

Figure 27 failed-allow-traffic in RADIUS-based MAC authentication
AP Groups > Add New Basic User-Defined Overrides Management Advanced configuration settings entered below will be applied on top of the AP Group settings sent to the device. This allows you to apply configuration not supported in the previous screens. If there are conflicts, the below settings will take precedence. The format used is the same as a configuration tile exported from the device via its web UI or the "View Device Configuration" link in the device level configuration page Radio Network Variables and Macros Security Settings entered are not validated or error-checked (However, dollar ($) period () or space characters are not allowed in a variable name and it should not be more than 64 characters long), and they may overwrite configuration made in previous screens, so please use them with caution. You are responsible for ensuring the resulting AP Group is valid and safe to use. Access Control Services User-Defined Overrides wireless wlan 1 mac-authentication radius failed-allow traffic 1

Passpoint

Below table lists configurable fields that are displayed in the WLANs > Passpoint tab.

Table 33 Passpoint parameters

ParametersDescription Range Default
Passpoint parameters
Enable Passpoint (Release 2) enables secure hotspot network access, online sign-up, and policy provisioning.- Disabled
DGAF Downstream Group Addressed Forwarding when enabled the WLAN does not transmit any multicast and broadcast packets.- Disabled
ANQP Domain IDANQP domain identifier is included when the HS 2.0 element is in Beacon and Probe Response frames.Indication 655350
Comeback DelayComeback Delay in milliseconds. 100-20000
Access Network TypeThe configured Access Network Type is advertised to Following are the different network types supported:PrivateChargeable PublicEmergency ServicesFree PublicPersonal DevicePrivate with GuestTestWildcardSTAS Private
ASRA Thisindicates that the network requires a further step for access. -Disabled
Internet Thenetwork provides connectivity to the Internet if not specified. -Disabled
HESSID Configures the desired specific HESSID network identifier or wildcard network identifier.the-
Venue InfoConfigure venue group and venue type. - -
Roaming ConsortiumThe roaming consortium and/or SSP whose security credentials can be used to authenticate with the AP.
ANQP ElementsSelect any one of the following:3GPP Cellular Network InformationConnection CapabilityDomain Name ListIconsIP Address Type informationNAI Realm ListNetwork Authentication TypeOperating Class IndicationOperator Friendly NamesOSU Provider ListVenue Name InformationWAN Metrics--

Figure 28 Passpoint parameters

WLAN > Add New WLAN AAA Servers Guest Access Access Contract Pamputell ePSX Basic Settings Enable Presupell (Release 2) enables a secure Insgated network access, online sign up and Policy Provisioning DGAF Downstream Group Addressed Forecasting. When enabled the WLAN (dramet I hieremif any multi-set) and broadcast packets. ANQP Domain ID: 0 ANQP domain identifier (0-65538) included where the MS 2.0 Indication element is in Biocon and Psubic Response Names Comeback Delay: 0 Comeback delay in milliseconds. Supported range is 100-2000 ms, use 0 to double Access Network Type Prud: The configured Access Network Type is advertised to STAs. ASRA: Additional Stop Required for Access, indicate that the network requires a further step for access Internet: The network proves connectivity to the Internet, otherwise unspecified HESSID Configure the desired spich; HESSD network identifier or the webband network identifier Venue Group select: Configure Venue group and Venue type Venue Type select: Roaming Consortium The routing consortium and/or SSP whose security credentials can be used to authenticate with the AP Add New Roaming Consortium Key Entries ANQP (Access Network Query Protocol) 3GPP Cellular Network Information Connection Capability Domain Names NAI (Network Access Identifier) Realim List Operator Friendly Names IP Address Type Information Network Authentication Operating Class Indication Venue Name Information WAN Metrics

RADIUS attributes

The table below shows the RADIUS attributes describes their interpretation.

Table 34 Radius attributes parameters

Type AttributeNameAttribute NumberPurpose
Standard Acct-Interim- 85 Specifies theInterval updatesinterval between accounting interim
Standard Acct-Session-Id 44 Session identification (RFC 5176)
Standard Calling-Station-Id31 Session identification (RFC 5176)
Standard Class25 Accounting classification
Standard Event-Timestamp55 Replay protection (RFC 5176)
Standard Filter-ID 11 •Assign station to a user group• Re-assign station to a different user group 5176)
Standard Framed-IP-Address8 Session identification (RFC 5176)
Standard Idle-Timeout 28 Specifies the amount of time a station may remain idle before its session is terminated
Standard NAS-IP-Address4 NAS identification (RFC 5176)
Standard NAS-Identifier 32NAS identification (RFC 5176)
Standard Session-Timeout27 Specifies the interval at which session is terminated
Standard Termination-Action29 Specifies the action to take when the session is terminated
Standard Tunnel-Type 64 Dynamic VLAN assignment (1 of 3 required), should be set to VLAN (Integer = 13)
Standard Tunnel-Medium-Type65 Dynamic VLAN assignment (2 of 3 required), should set to 802 (Integer = 6)
Standard Tunnel-Private-Group-ID81 Dynamic VLAN assignment (3 of 3 required), should set to the VLAN ID or name
Standard User-Name 1Station username update• Session identification (RFC 5176)
Microsoft Vendor-SpecificMS-MPPE-Send-Key16Session key distribution
Microsoft Vendor-SpecificMS-MPPE-Recv-Key17Session key distribution

(RFC

Type AttributeNameAttribute NumberPurpose
Cambium Vendor-SpecificCambium-Vlan-Pool-Id157 Radiusbased VLAN pool
Nas Port IDNAS-Port-Id 87NAS identification (RFC 5176)

Enterprise PSK (ePSK)

By using the ePSK feature, users can configure and support individual PSKs for different clients. The can be configured under a given WLAN configuration in cnMaestro UI. For on devices, only CLI is available.

This feature also supports individual VLAN assignments for a given key which helps to put client different VLANs for limiting broadcast traffic.

Cambium Networks XE5-8 - Enterprise PSK (ePSK) - 1

Note:

• Maximum key limit for cnMaestro Essentials: 300 per account
• Maximum key limit for cnMaestro X: 2000 per WLAN and 50000 per account

Configuring ePSKs

To create an ePSK, complete the following steps:

  1. Navigate to Configuration > Wi-Fi Profiles.
  2. Select WLAN tab and click Add.
  3. Select Enterprise Wi-Fi from the Type drop-down list and enter details in the Basic Information section.
  4. In the Basic Settings section, ensure the WPA2 Pre-Shared Keys option is selected in the Security drop-down list.
  5. Click Save.
  6. Click the ePSK tab and select the Local option in the Mode field.
  7. Select the type of Passphrase Strength as one of the following options:

  8. Easy—Supports a maximum of eight alphanumeric characters
    • Strong—Supports a maximum of 16 alphanumeric and special characters
    • Number—Supports a maximum of eight integers

  9. Click Add New.

The Add ePSK window is displayed.

  1. Select Mode type as one of the following options and configure the corresponding parameters:

- Single mode—Only one entry is created in this mode

Add ePSK Mode Single Bulk User Name * The number of characters allowed is between 1 and 31 Expiry by None Passphrase : The number of characters allowed is between 8 and 32 MAC Address VLAN VLAN ID should be in between 1 and 4094 Save

Cambium Networks XE5-8 - Configuring ePSKs - 2

Note:

The Passphrase field is optional and is automatically generated based on the selected Passphrase Strength.

- Bulk mode—Multiple entries are created in this mode depending on the count configured

Add ePSK Mode Single Bulk Count* This allows values between 2 and 2000 User Name Prefix* Username and Passphrase will be auto generated i.e prefix-1 Expiry by None VLANs Use comma " " separated VLANs. To provide a range use -> Save

VLANs > Default Enterprise Configuration Devices WLAN AAA Server Guest Access Access Control Passport uPSL Base WLAN for Personal Wi-Fi SSD X Turning on this setting will enable the WLAN's SSD. Use the Wi-Fi AP device configuration tab to access Settings - Wi-Fi AP server to enable it with a personalized SSD name. Mode Local RADIUS Configue LOCAL OS based uPSL or RADIOS based ePSL. Please config the AAA server when RADIOS based ePSL is selected. Phosphise Strength Easy Strong Number This allows Aphantomeric and Sporier Characters (up to % Character) Add/ New Import Export Details User Name MAC Address Phosphise Creation Date Expiration Date Status VLAN agent N/A 12145678 West. Aug 30 2023 Active N/A ✓ ✓ test1 N/A #HS=66mpA2B(HG) West. Aug 30 2023 Aug 30 2024 ILS.. Active 10 ✓ ✓ ✓ test10 N/A #L#H#dMgplap West. Aug 30 2023 Aug 30 2024 ILS.. Active 20 ✓ ✓ ✓ test100 N/A pHc-FinFir*2*Rel West. Aug 30 2023 Aug 30 2024 ILS.. Active 20 ✓ ✓ ✓ test1000 N/A %EJ#H#6(MgR) West. Aug 30 2023 Aug 30 2024 ILS.. Active 20 ✓ ✓ ✓ test101 N/A u.FoF497D#MeEs West. Aug 30 2023 Aug 30 2024 ILS.. Active 10 ✓ ✓ ✓ test102 N/A kjwHF-T2yU#Cs OS West. Aug 30 2023 Aug 30 2024 ILS.. Active 20 ✓ ✓ ✓ test103 N/A gg2hwHfBABISfs West. Aug 30 2023 Aug 30 2024 ILS.. Active 10 ✓ ✓ ✓ test104 N/A yCn_ "kKRxUsJs West. Aug 30 2023 Aug 30 2024 ILS.. Active 20 ✓ ✓ ✓ test105 N/A ZABiSQ*BPOTCpkn West. Aug 30 2023 Aug 30 2024 ILS.. Active 10 ✓ ✓ ✓ View(1) (1) Total: 10% (5) < / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > / > />

  1. To automatically expire ePSK details after a specific duration. The following options are available

Cambium Networks XE5-8 - Note: - 3

Note:

This feature is available from cnMaestro 4.1.0 and later versions only.

  • None—ePSK details never expire. Select None to never expire the ePSK credentials.
  • Date and Time— ePSK expires after the specified date and time (in dd/mm/yyyy hh:mm AM format)

Supported minimum time is 12 A.M. on the next day and the maximum is five years.

Expiry by Date and Time 12/04/2024 03:05 PM Set expiration time for the created ePSK. Expired ePSKs will not be pushed to the APs when the configuration is pushed manually or applied automatically by Auto Sync.

- Duration— ePSK expires after the specified (in hours, days, months, or years) in the Expiry by drop-down.

Supported minimum duration is one hour and the maximum is five years. No decimal values supported, for example, 1.5 hours.

Expiry by Duration 1 Years Set expiration time for the created ePSK. Expired ePSKs will not be pushed to the APs when the configuration is pushed manually or applied automatically by Auto Sync.

Cambium Networks XE5-8 - Note: - 3

Note:

  • The configured expiry time appears in the Expiration Date column on the WLANs > page.
  • The Status column on the WLANs > page displays the status of the ePSK details—Active, Expired, or None. None is displayed only when older ePSK keys are imported to cnMaestro.
  • Expired ePSK details are deleted from the AP only when the next configuration functionality is initiated or when there is a configuration change in the AP.

ePSK registration for WPA3 clients

For the ePSK feature, when you configure WPA3-WPA2 (mixed mode)-PSK or WPA3-PSK as the WLAN security, the clients connection in the WPA3 mode must go through an additional registration phase. different from the flow when you configure WPA2-PSK as the WLAN security, where users can authe by using only a passphrase.

When clients use WPA3-PSK security, Simultaneous Authentication of Equals (SAE) is the authentication mechanism where an extra authentication is added, which is more secure than WPA2. For WPA2-PSK clients, the passphrase is matched against a database to identify the user. However, this is not possible for WPA3-PSK clients because of the extra authentication in WPA3-SAE. When WPA2-PSK security is used by Pairwise Master Key (PMK) is the same for every connection made by the client. This is due to weaknesses in WPA2-PSK, which make it easier to validate the passphrase. In contrast, when WPA3-PSK security is used, a new PMK is generated each time a client joins the network. Therefore, registration help us to know the passphrase upfront when a client tries to connect. This mandates the users themselves with the ePSK passphrase to bind the client MAC with the passphrase to successfully do the Wi-Fi network.

For WPA3 clients to connect to the network using ePSK flow:

  1. First connect to the WLAN with the WLAN passphrase.

A simple password is recommended to be configured, for example, signmeup, or any other appropriate passphrase.

  1. Register themselves with the WPA3-ePSK unique passphrase.

After the MAC binding is complete, users can use the WPA3-ePSK unique passphrase for subse WLAN connections.

This section describes the following topics:

• ePSK with WPA3 feature recommendations
- Scenarios while registering clients
- Enabling ePSK registration flow using the AP CLI
- Configuring ePSK registration for WPA3 clients
- Registration flow screenshots
• Recommended best practices

ePSK with WPA3 feature recommendations

The following are the recommendations for this feature:

  • This feature is supported only on cnMaestro Cloud 5.1.0 onwards.
    • Supported AP firmware version is 6.6.1 or 7.0 and above.
    • Security mode must be configured to either WPA2/WPA3 Pre-shared Keys or WPA3 Pre-shared Keys.
  • APs must be managed from cnMaestro Cloud for client registration.
    • The WLAN VLAN must be able to provide DHCP to clients and must have internet connectivity
    • This feature is not supported on Enterprise Wi-Fi 5 APs and Xirrus APs.

Scenarios while registering clients

When a client connects to the WLAN, the following scenarios are possible:

- When a client connects for the first time using WPA2 security and ePSK passphrase (either on or 5 GHz radios), the AP performs an ePSK lookup. The following are the outcome:

° If a match is found, the MAC binding is created with the respective ePSK key.

AP shares this MAC binding information with the other APs in the network.

° If a match is not found, the connection fails.

  • If the WPA2 client is connected using the WLAN passphrase, client registration steps are performed by bind the passphrase to the client.
  • When a client connects for the first time using WPA3 security, the following two possibilities m

  • If MAC binding is not available for the client on the AP, the following procedure must be for successful registration of clients:

a. User must authenticate using the configured WLAN passphrase, for example, signmeup.

If the user tries to sign in with some other password other than the configured WLAN (signmeup), the connection fails.

b. If the connection with the configured password (signmeup) is successful, the AP redirects the client to the registration page.

This is the only traffic allowed for the client with this WLAN passphrase.

c. User must now enter the configured ePSK passphrase and register.

The AP redirects the client to the registration page with instructions.

d. Users must select the checkbox after reading the instructions (provided for different clients such as Android, Windows, and iOS), and then disconnect from the network.

e. User must forget the WLAN/SSID and reconfigure using the ePSK passphrase.

User then reconnects with ePSK passphrase and gets authenticated.

For a more detailed information, see Registration flow screenshots.

  1. When MAC binding is available for the client on the AP, users can authenticate the client passphrase present in the MAC binding, that is the ePSK passphrase.

Figure 29 Client registration flow for WPA3 clients
Cambium Networks XE5-8 - Scenarios while registering clients - 1

flowchart
graph TD
    A["Association Request"] --> B{Known MAC?}
    B -->|Yes| C["Complete Auth using ePSK for the MAC"]
    B -->|No| D{WPA2 or WPA3?}
    D -->|WPA2| E["Use ePSK WPA2 Lookup process to Complete Auth"]
    D -->|WPA3| F["Attempt to authenticate client with well known PSK"]
    E --> G["Bind MAC address to ePSK and update common DB"]
    F --> H["Record Success. Done"]
    H --> I["Record Success. Done"]
    I --> J["Inform client to reconnect using ePSK on the same SSID. Disconnect Client."]
    J --> K["Send client to a &quot;MAC Binding&quot; Captive Portal to login via ePSK"]
    K --> L{Success?}
    L -->|Yes| M["Record Failure. Done"]
    L -->|No| N["Record Success. Done"]
    N --> O{Well known Key?}
    O -->|No| P["If failure exceeds threshold, check if device is still using the well known key by attempting to handshake with the well known key. (For WPA2, try ePSK key and well known key in one attempt)"]
    O -->|Yes| Q["Record Failure. Done"]
    Q --> R["End"]

Enabling ePSK registration flow using the AP CLI

To enable ePSK registration for WPA3 clients in the AP CLI, execute the following commands:

ap(config)# wireless wlan 1
ap(config-wlan-1)# epsk-registration-flow 

Configuring ePSK registration for WPA3 clients

To enable WPA3-ePSK registration, you must create a WLAN profile and add ePSK entries in the

To create WLAN profile and add ePSK entries, complete the following steps:

  1. Navigate to Configuration > Wi-Fi Profiles page.
  2. Select WLANs tab and click Add.
  3. Select Enterprise Wi-Fi from the Type drop-down list and configure the WLAN parameters.
  4. In the Basic Settings section, ensure either the WPA2/WPA3 Pre-shared Keys or WPA3 Pre-shared Keys option is selected in the Security drop-down list.
  5. Enter the WLAN passphrase.
  6. Click Save.

- When ePSK passphrase is not configured in the WLANs > ePSK page, the following message is displayed explaining the registration flow.

Figure 30 Message on the ePSK page when no ePSK entries are added
WLANs > Add New WLAN AAA Servers Guest Access Access Control Passpoint ePSK Base WLAN for Personal Wi-Fi SSID X Turning on this setting will disable this WLAN's SSID. Use the Wi-Fi AP device configuration tab i.e. Advanced Settings → WLANs section to enable it with a personalized SSID name. Mode Local RADIUSX Configure LOCAL DB based ePSK or RADIUS based ePSK. Please configure AAA server when RADIUS based ePSK is selected. Passphrase Strength Easy Strong Number This allows Alphanumeric and Special Characters (up to 16 Characters) This WLAN uses WPA3 security. Client registration flow is required and will be enabled when ePSK entries are added. Use the QR code to guide users for registering their clients. Note that the WLAN Passphrase will be used to verify that the client is attempting registration. Ensure that the client will get DHCP IP on the WLAN VLAN and will be able to reach cnMaestro Cloud. Add New Import Export Delete User Name MAC Address Passphrase Creation Date Expiration Da... Status VLAN No Data Available Showing 0 C Total: 0 10 Previous Not + New Close

- For existing WLANs where ePSK entries are present and when WPA2/WPA3 Pre-shared Keys WPA3 Pre-shared Keys option is selected in the Security drop-down list, the following messages appear respectively

Figure 31 When WPA3 Pre-shared Keys option is selected
SSID Enable SSID* eVPSK eWKS The SISD of this WLAN (up to 32 characters) Mesh Off Mesh Base/Client/Recovery mode VLAN* ! Default VLAN assigned to clients on this WLAN (1-4094): Security WPA3 Pro Stored Keys Set authentication and encryption type For next client experience with ePSK, use WPSK2/WPSK3 PSK or WPA2 PSK security mode. Registration flow is enabled for WPA3 clients Learn more on how to enable WPA3 with ePSK. PSSPHRAS* winpassword Now X WPSK Pro-shared security pssphrose or key (must contain B to 63 ASCII or 64 Hexadecimal digits)

Figure 32 When WPA2/WPA3 Pre-shared Keys option is selected
SSID Enable SSID* ePSK WPSK3 The SSID of this WLAN (up to 32 characters) Mesh Off Mesh Base/Client/Recovery mode VLAN* 1 Default VLAN assigned to clients on this WLAN (1-409H) Security WPSK/WPSK Pre-Shared Keys Set authentication and encryption type Registration flow for ePSK is enabled for WPSK clients. Learn more on how to enable WPSK with ePSK. Passgrise: winpassword How X: WPSK/WPSK Pre-shared security passphrase or key (must contain B to 63 ASCII or 64 Hexadecimal digits)

  1. Click the ePSK tab and add the passphrase.

After the ePSK passphrase is added, the following message is displayed explaining the registration flow.

Figure 33 Message on the ePSK page when ePSK entries are added
Passphrase Strength Easy Strong Number This allows Alphonumeric and Special Characters (up to 16 Characters) This WLAN users WPA3 security Client registration flow is active. Use the QR code to guide users for registering their clients. Note that the WLAN Passphrase will be used to verify that the client is attempting registration. Ensure that the client will get DHCP IP on the WLAN VLAN and will be able to reach cnMoestro Cloud. Add New Import Export Delete User Name MAC Address Passphrase Creation Date Expiration Date Status VLAN ePSK N/A epskpassword@1234 Thu, Jun 13, 2024 Jun 13 2025 12:47:05 Active 1 Showing 1 Total 1 10 Previous Next

Registration flow screenshots

To register the clients to the network using the ePSK passphrase, users must complete the following

  1. Connect the client to the network using the WLAN passphrase.

Figure 34 Using WLAN passphrase for connecting to network
The Wi-Fi network "ePSK-WPA3" requires a WPA3 password. Password: wlanpassword ✓ Show password ✓ Remember this network Connection failed. Cancel Join

  1. Click Join.

Clients are redirected to the Client Registration page for providing the ePSK passphrase.

  1. Enter the ePSK passphrase in the Passphrase field and click Register.

Figure 35 Using ePSK passphrase for client registration
Join "ePSK-WPA3" Client Registration Passphrase* epskpassword@1234 Enter your unique Wi-Fi password Register How to get passphrase? To connect to this secure Wi-Fi network, you must first register your client once using this form. Please use the unique Wi-Fi password provided by your administrator here. This unique password is different from the general password you used to reach this form. If you need help or forgot your unique Wi-Fi password, please reach out to your administrator for assistance.

The registration success page is displayed along with a set of instructions.

  1. Read the instructions (provided for different devices, such as Android, Windows, and iOS) and s checkbox for confirmation.

The instructions provide details of the next steps for different devices.

The Disconnect button is enabled.

Figure 36 Registration success page with instructions
Join "ePSK-WPA3" Client Registration Successful The one-time registration process of this client to the Wi-Fi network is complete! Please follow instructions below to connect to this network on a regular basis. Once you click the "Disconnect" button below, your device should automatically disconnect from this network and try to connect again. You should then see a pop-up window appear asking for the Wi-Fi password. Enter the unique Wi-Fi password you used just now in the previous screen. If you do not see the pop-up window or if you see a message that the password is wrong, go to your Wi-Fi settings and forget this network. Then connect back to this network again using your unique password. For the best experience, it is recommended to disable the MAC Privacy feature you can find in your device Wi-Fi Settings. Please review additional details under the device type sections below, and then click the Disconnect button. For Android Users For Apple Users ✓ I have read above instruction and understood process. Disconnect Print 6 qa-us-e1-guest.cloud.cambiumnetworks.com Cancel

5. Click Disconnect.

The client is disconnected and a disconnect success message is displayed.

Figure 37 Disconnect success page
Join "ePSK-WPA3" Successfully disconnected. Please follow the instructions given earlier to reconnect.

6. Reconnect to the network using the ePSK passphrase that you provided in the Client Registration page earlier.

The client connects to the network with the mapped VLAN.

Figure 38 Using ePSK passphrase for connecting to network
The Wi-Fi network "ePSK-WPA3" requires a WPA3 password. Password: epskpassword@1234 ✓ Show password ✓ Remember this network Connection failed. Cancel Join

Following are some of the best practices you can follow while configuring ePSK registration for WF clients:

- WPA3 PSK is not recommended for unmanaged (BYOD) clients (For example, multi-dwelling unit (hospitality, and educational institutions).

In MDUs, with IoT clients, making WPA3 mandatory with a single SSID may not be a success deployment.

  • WPA2/WPA3 PSK is recommended for unmanaged clients and to transition from the current (WPA PSK).
  • Most of the WPA3-capable clients favor WPA3 PSK when available. This behavior is different an other clients, where some fallback to WPA2 and some which do not.
  • When the SSID is mapped to 2.4 GHz and 5 GHz radios, WPA2 PSK or WPA2/WPA3 PSK recommended.
  • When the SSID is mapped to 2.4 GHz, 5 GHz, and 6 GHz radios, or only the 6 GHz radii PSK security is recommended.

Creating a Personal Wi-Fi ePSK

Cambium Networks XE5-8 - Creating a Personal Wi-Fi ePSK - 1

Note

This feature is available from cnMaestro 4.1.0 and later versions only.

In Multiple Dwelling Units (MDU), personal Wi-Fi allows a user to connect all the personal devices SSID associated with a VLAN.

To configure personal W-Fi on the AP, complete the following steps in the cnMaestro UI:

  1. Add and enable the SSID details (to be used as personal Wi-Fi) in the WLANs tab, under Manage and Operation > Networks > > Configuration > Device Configuration > Advanced Settings section.

a. Select the Enable SSID checkbox.

b. In the Passphrase field, configure the passphrase.

c. Configure the VLAN with which the SSID must be associated.

  1. Enable personal Wi-Fi on the ePSK page for the WLAN profile by selecting the Base Personal SSID checkbox.

By default, this feature is disabled. Once enabled, the Enable checkbox (under WLANs > WLAN > Basic Settings > SSID) is cleared. Also, the local and RADIUS ePSKs are disabled.

For more information on configuring personal Wi-Fi, refer to the cnMaestro User Guide.

RADIUS-based ePSK Premium feature

Cambium Networks ePSK feature is an extension of WPA2 PSK where multiple passphrases can be assigned to a single SSID. The Wi-Fi clients can have unique passphrases that can be used by using this feature. The same feature has been now extended to RADIUS.

The RADIUS server can provide the matching PMK for a given client, and corresponding standard I attributes can be enforced for a client session. This requires custom development on the RADIUS

Cambium Networks XE5-8 - RADIUS-based ePSK Premium feature - 1

Note

ePSK feature is not supported with WPA3.

Configuring RADIUS-based ePSK

To configure RADIUS-based ePSK, complete the following steps:

  1. Navigate to Configuration > Wi-Fi Profiles.
  2. Select WLAN tab and click Add.
  3. Select Enterprise Wi-Fi from the Type drop-down list and enter details in the Basic Information section.
  4. In the Basic Settings section, ensure the WPA2 Pre-Shared Keys option is selected in the Security drop-down list.
  5. Click Save.
  6. Click the ePSK tab and select theopRADIUS the Mode field.

WLANs > Add New WLAN AAA Servers Guest Access Access Control Passpoint ePSK Base WLAN for Personal Wi-Fi SSID X Turning on this setting will disable this WLAN's SSID. Use the Wi-FL AP device configuration tab i.e. Advanced Settings > WLANs section to enable it with a personalized SSID name. Mode Local ● RADIUS X Configure LOCAL DB based ePSK or RADIUS based ePSK. Please configure AAA server when RADIUS based ePSK is selected.

You must configure AAA servers when configuring RADIUS-based ePSK. See cnMaestro User Guide f information on configuring AAA servers.

CAMBIUM Networks WLAN = Add Now WLAN Warning: AAA Servers are configured separately to each WLAN. Authentication Server 1. Host 2. Host 3. Host Timeout Attempts Accounting Server 1. Host 2. Host 3. Host Timeout Attempts Accounting Mode Name Accounting Packet Enable Accounting-Di messages Type: Accounting Records Configure accounting seconds to be signed across neighboring APs Interim Update Interval Date Interval for RADIUS Intent-Accounting Updates (10-60525 Seconds) Advanced Settings Server Port Mode List Balance: Load balance requests equally among configured servers Follow: Move down server list when easier server is unouchable NAS-Identifier AP-HOSTNAME NAS identifier attributes for use in Request packets (defaults to system name) Dynamic Authentication Enable RADIUS dynamic autotransfer (COAL, DM messages) Dynamic VLAN Enable RADIUS assigned VLANs Called Station ID: AP MAC-SSD Configure AP-MAC-SSD as Called Station-list in the RADIUS packet Save Close

Groupwise Transient Key (GTK) per VLAN

The APs support dynamic VLAN via ePSK/RADIUS based/VLAN-pool feature on a given WLAN profile. client traffic is tagged as per the VLAN assigned dynamically. The unicast traffic works fine as each generates a unique PTK. However, the AP provides common GTK for all the clients associated with WLAN profile irrespective of the VLAN that belongs to. This causes all clients irrespective of the assigned can receive broadcast/multicast data traffic of other VLAN traffic.

The solution is to generate the GTK per VLAN and forward it to clients as part of the WPA2 I that the broadcast/multicast data traffic is encrypted using GTK based on the VLAN tag of the packet maximum number of GTKs supported is 127 per radio. By default it is disabled.

cnMaestro configuration:

AP Groups > Ent_Mesh_ZeroTouch_APGrp
Dashboard Notifications Configuration Statistics Devices Clients Mesh Peers
BasicUser-Defined Overrides
ManagementAdvanced configuration settings entered below will be applied on top of the AP Group settings sent to the device. This allows you to apply configuration not supported in the previous screens. If there are conflicts, the below settings will take precedence. The format used is the same as a configuration file exported from the device via its web UI or the "View Device Configuration" link in the device level configuration page.
RadioVariables and Macros
NetworkSettings entered are not validated or error-checked (However, dollar ($) , pedal ( ) or space characters are not allowed in a variable name and it should not be more than 64 characters long), and they may overwrite configuration made in previous screens, so please use them with caution. You are responsible for ensuring the resulting AP Group is valid and safe to use.
Security
Services
User-Defined Overrideswireless start! glo-pen-dan !

Dynamic ARP Inspection

Dynamic ARP Inspection detects and prevents ARP spoofing by validating ARP packets against a trust to-MAC address mapping. When a client sends an ARP packet, such as one claiming to be the system checks whether the claimed IP matches the client's registered IP in the wireless client table a mismatch, the packet is identified as spoofed and is dropped. Gateway IPs are learned dynamically DHCP packets (router option) during client associations, allowing the system to build a mapping tabl validation. It does not track gateway MAC addresses, as IP validation is sufficient for detecting sp

Spoofed ARP events are logged and visible via CLI commands, such as show events and show wireless spoofed-arp-stats.

This feature is available only as CLI command that you can configure in the AP Groups > User Overrides section in cnMaestro. A sample configuration snippet is shown below:

!
wireless wlan 1
dynamic-arp-inspection
! 

Configuring the Network

This chapter describes the following topics

Overview
- Configuring Network parameters

Overview

This chapter gives an overview of the Enterprise Wi-Fi AP configuration parameters related to LAN, Routes, DHCP server, ACL, and Firewall.

Configuring Network parameters

Enterprise Wi-Fi AP network configuration parameters are segregated into the following sections:

• VLAN
- Routes
- Ethernet Ports
- Port Control—802.1X Authentication
• DHCP
- Tunnel
- PPPoE
• VLAN Pool
• Wireless Wide Area Network (WWAN)

IPv4 network parameters

VLAN

Cambium Networks XE5-8 - VLAN - 1

Note

By default, the XRP messages are sent through the native VLAN. From release version onwards, a new CLI command (roam management-vlan) is added to enable XRP messages to be sent through any VLAN other than the native VLAN. When configured, the roaming must have an L3 interface on the AP.

To configure network parameters, complete the following steps:

  1. Navigate to Configuration > Wi-Fi Profiles > AP Groups page.
  2. Click Add New and select Enterprise Wi-Fi (E-Series, XE/XV/X7-Series) from the Type drop-down list.

  3. Click Network tab > VLANs section.

Figure 39 Network > VLANs section
AP Groups > Add New Basic Management Radio Network Security Access Control VLANs Add Now VLANs IPv4 NAT Zeroconf IP Management Access DHCP Relay Agent IPv6 1 dhcppassDisable enable Allow from Wind and Wireless Disabled 30 - Microsoft 1 Email

  1. Click Add New and configure the IPv4 parameters described in the following table.

Table 35 VLAN IPv4 parameters

ParametersDescription Range Default
VLAN > IPv4
Address Provision to configure the mode of IPv4 address configuration DHCP an interface selected. Two modes are supported:DHCP—This is the default mode in which the Enterprise Wi-Fi AP device tries to obtain an IPv4 address from the DHCP server.Static IP—Users must explicitly configure the IPv4 address and Netmask for a VLAN selected.DHCP
NAT This option enables wireless traffic gets NAT'ed with APs respective uplink interface IP. This option is recommended when DHCP pools are configured in AP.- Disabled
Zeroconf IPZeroconf IP is recommended to be enabled. This interface enabled available only in the VLAN1 configuration section. If VLAN 1 is not allowed in Ethernet interfaces, this IP will not be accessible.
DHCP Relay AgentThis option is enabled when DHCP server is hosted on DISVLAN which is not same as client that is requesting the DHCP IP. Enabling this appends Option 82 in the DHCP packets. Following information is allowed to configure:DHCP Option 82 Circuit IDConfigurable parameters under this option are as follows:HostnameAPMACBSSIDSSIDDISVLAN
CustomDHCP Option 82 Remote IDConfigurable parameters under this option are as follows:HostnameAPMACBSSIDSSIDCustomCambium Networks XE5-8 - Note - 2NoteIn case DHCP Option 82 is configured at the device-,WLAN profile-, and L3 interface-levels, the following priority order is considered:Device-level configurationWLAN profile-level configurationL3 interface-level configurationFollows:
RequestOption AllThis configuration decides the interface on which Enterprise AP will learn the following:IPv4 default gatewayDHCP client options like Option 43 and Option 15 (Controller discovery like controller host name / IPv4 address)DNS ServersDomain NameEnactedon VLAN1

Figure 40 VLAN IPv4 parameters
Add VLAN VLAN ID 1 Please enter VLAN ID (1 to 4094) IPv4 IP Address DHCP Static IP xxxxxxxxxxxxxxxxxx Netmask xxxxxxxxxxxxxxxxxx NAT When NAT is enabled, IP addresses under this Switched Virtual Interface are hidden Zeroconf IP Support 169.254.x.x local IP address DHCP Relay Agent xxxxxxxxxxxxxxx Enable relay agent and assign DHCP server DHCP Option 82 Circuit ID None DHCP Option 82 Remote ID None Request Option All Enable DHCP request option all on this interface IPv6 General Add

DHCP Client Options

Enterprise Wi-Fi AP devices learn multiple DHCP options for all VLAN interfaces configured on the Based on configured criteria, values of these options are used by the system. The below table lis different DHCP options.

Table 36 DHCP Options

OptionsDescription Usage ReferenceCLI
Option 1The subnet mask option specifies client's subnet mask as per RFBased on the state of “Request Option All”, the device chooses a subnet mask from the respective VLAN interface.show ip route
Option 3This option specifies a list of addresses for routers on the subnet.Based on the state of “Request Option All”, the device chooses a route learned from the respective VLAN interface. The only first route is honored.show ip route
Option 6The domain name server option specifies a list of Domain Name System (STD 13, RFC 1035) name servers available to the client. SHOULD be listed in order of preference.Based on the state of “Request Option All”, the device chooses subnet mask from the respective VLAN interface. the top two DNS servers are honored by Enterprise Wi-Fi AP devices.show ip name-server
Option 15This option specifies the domain that the client should use when resolving hostnames via the Domain Name System.More details are provided in Option 15.show ip dhcp-client info
Option 26This option specifies MTU size network.More details are provided in Configuring the Network.show ip dhcp-client info
Option 28This option specifies the broadcast address that the client should address that the client should use LAN interfaces are used respectively as per standardsAt broadcast address learned for all DHCP server while a request to get an IP address the DHCP server.show ip dhcp-client-info
Option 43This option is used to help obtain the cnMaestro IP address from the DHCP server while a request to get an IP address the DHCP server.More details are provided in Option 43 (cnMaestro On-Premises 2.4.0 DHCP Guide). is sent toshow ip dhcp-client info
Option 51This option is used in a client to allow the client to request time for the IP address. In a reply, a DHCP server uses this to specify the lease time it is offer.Enterprise Wi-Fi AP renew leases for all VLAN interfaces configured serve lease time that has been from the DHCP server. willing toshow ip dhcp-based learned
Option 54DHCP clients use the contents server identifier field as the destination address for any DHCP messages unicast to the DHCPEnterprise Wi-Fi AP learns DHCP server IP for all VLAN interfaces configured. server.show ip dhcp-client info
Option 60This option is used by DHCP optionally identify the vendor type configuration of a DHCP client.Enterprise Wi-Fi AP device, is updated as Cambium-Wi-Fi-AP.show ip dhcp-client info

DHCP Option 43—Zero-touch onboarding

This option is used to help the AP in obtaining the cnMaestro/XMS IP address from the DHCP s DHCP request to get an IP address is sent to the DHCP server.

This option is used to learn HTTPS proxy server address from the DHCP server as well.

DHCP Option 43 format

If HTTP proxy needs to be configured, then the following format must be used:

The cnMaestro/XMS URL and HTTPS proxy URL can be packed into Option 43 payload in a key-separated by ‘,’ like . Key and its value are separated by ‘=’ character.

For example,

0=CMBM;1=cloud.cambiumnetworks.com;2=http://user:userpass@IP/URL:port, where identifiers are listed below:

  • 0 is for header CMBM - Mandatory
    • 1 is for the server's URL
    • 2 is for HTTP proxy URL

Cambium Networks XE5-8 - DHCP Option 43 format - 1

Note

If only cnMaestro URL configuration is needed then Option 43 payload can contain only too without key-value format as described above.

Routing and DNS

Table 37 AP Groups > Network > VLAN > Routes > IPv4 Routing and DNS parameters

ParametersDescription Range Default
Default GatewayProvision to configure the default gateway. If this is provided, Enterprise Wi-Fi AP device installs this gateway as this highest priority.provided, is the-
DNS ServerProvision to configure Static DNS server on Enterprise device. A maximum of two DNS servers can be configured.Wi-Fi AP-
Domain NameProvision to configure Domain Name. If this is provided,- Enterprise Wi-Fi AP device installs this Domain Name as this is priority.the highestise
DNS ProxyEnterprise Wi-Fi AP device can act as DNS proxy server is enabled.Cambium Networks XE5-8 - Routing and DNS - 1NoteDNS Proxy is allowed only when NAT mode is enabled for the WLAN.Disabledthis

Figure 41 IPv4 Routing and DNS parameters
AP Groups > Add New Basic Management Radio Network Security Access Control Services User-Defined Overrides Routes IPv4 Routing and DNS Default Gateway XXXXXXXXXX.XXX IP address of default gateway Domain Name Domain name DNS Server 1 XXXXXXXXXX.XXX Primary domain name server DNS Server 2 XXXXXXXXXX.XXX Secondary domain name server DNS Proxy

Routes

Below table lists the fields that are displayed in Configure > Network > Routes tab:

Table 38 IPv4 Gateway Source Precedence, Route entries, and Port forwarding parameters

ParametersDescription Range Default
Gateway Source PrecedenceProvision to prioritize default gateway and DNS servers Enterprise Wi-Fi AP device has learned from multiple ways. order is Static and DHCP.whestatic. Default
Add Multiple Route EntriesThe user has provision to configure static Routes. Parameters that are required to configure static Routes are as follows:Destination IPMaskGateway
Port ForwardingThis feature is required when wireless stations are behind NAT. Users can access the services hosted on wireless stations using feature. Following configurable parameters are required to gain access to services hosted on wireless stations which are behind:PortIP AddressType- this

Figure 42 IPv4 Gateway Source Precedence, Route entries, and Port forwarding parameters
AP Groups > Add New Basic Management Radio Network Security Access Control Services User-Defined Overrides IPv6 Routing and DNS IPv4 Gateway Source Precedence ^ 1 Static ^ 2 DHCP ^ 3 PPPoE IPv6 Gateway Source Precedence IPv4 Multiple Route Entries Add New Destination IP Mask Gateway No Multiple Routes configured IPv6 Multiple Route Entries Port Forwarding Add New Port IP Address Protocol No Port Forwarding configured

IPv6 network parameters

VLAN

Table 39 VLAN IPv6 parameters

ParametersDescription Range Default
Address Provision to configure the mode of IPv6 address configuration for an interface selected. Five modes are supported:DisabledAutoConfigStaticStateless DHCPv6Stateful DHCPv6AutoConfig
Request Option AllThis configuration decides the interface on which AP will learn the following:- Enabled on VLAN1
IPv6 default gatewayDHCP client options like Option 52 and Option 24(Controller discovery like controller hostname / IPv6 address)DNS ServersDomain Name

Figure 43 VLAN IPv6 parameters
Add VLAN VLAN ID Please enter VLAN ID (1 to 4094) IPv4 IPv6 Mode Static IPv6 Address Prefix Length Request Option All Use IPv6 Gateway, DNS, DHCPv6 options received on this interface General Add

Routing & DNS

Table 40 IPv6 Routing and DNS parameters

ParametersDescription Range Default
Default GatewayProvision to configure the default gateway. If this is provided, Enterprise Wi-Fi AP device installs this gateway as this highest priority.provided, is the-
DNS ServerProvision to configure Static DNS server on Enterprise device. A maximum of two DNS servers can be configured.Wi-Fi AP-
Domain NameProvision to configure Domain Name. If this is provided,- Enterprise Wi-Fi AP device installs this Domain Name as this is the highest priority.the highest-
IPv6 PreferenceWhen enabled, IPv6 is preferred over IPv4 based on response.DNSDisabled-

Figure 44 IPv6 Routing and DNS parameters
AP Groups > Add New Basic Management Radio Network Security Access Control Services User-Defined Overrides Routes IPv4 Routing and DNS IPv6 Routing and DNS Default Gateway IP address of default gateway Domain Name Domain name DNS Server 1 Primary domain name server DNS Server 2 Secondary domain name server IPv6 Preference Prefer IPv6 address over IPv4 for addresses resolved via DNS

Routes

Table 41 IPv6 Gateway Source Precedence and Multiple Route Entries parameters

ParametersDescription Range Default
Gateway Source PrecedenceProvision to prioritize default gateway and DNS servers Enterprise Wi-Fi AP device has learned from multiple ways. Default order is Static and AUTO-CONFIG/DHCPC.when Static
Add Multiple Route EntriesThe user has provision to configure static Routes. Parameters that are required to configure static Routes are as follows:Destination IP/prefixGatewaymeters that

Figure 45 IPv6 Gateway Source Precedence and Multiple Route Entries parameters
AP Groups > Add New Basic Management Radio Network Security Access Control Services User-Defined Overrides Routes IPv4 Routing and DNS IPv6 Routing and DNS IPv4 Gateway Source Precedence IPv6 Gateway Source Precedence 1 Static 2 Auto-config/DHCPv6 IPv4 Multiple Route Entries IPv6 Multiple Route Entries Add New Destination IP Gateway No Multiple Routes configured Port Forwarding

General network parameters

Table 42 VLAN - General parameters

ParametersDescription Range Default
Management AccessProvision to restrict the access of devices in all (Telnet, SSH), GUI (HTTP, HTTPS), and SNMP. Users can configure restriction of device access as follows:BlockAllow from WiredAllow from both Wired and WirelessmodAllowCfrom both Wired and Wireless

Select Management Access to configure restriction of the device from the drop-down list.

Figure 46 VLAN - General parameters
Add VLAN VLAN ID Please enter VLAN ID (1 to 4094) IPv4 IPv6 General Management Access Allow from Wired and Wireless CLI/GUI/SNMP access via this interface Add

Ethernet Ports

Below table lists the fields that are displayed in AP Groups > Network > Ethernet Ports tab.

Table 43 Ethernet Ports 1 to 4 parameters

ParametersDescription Range Default
Ethernet Port<1-4>Enterprise Wi-Fi AP devices Ethernet port is provisioned operate in the following modes:Access Single VLAN—Single VLAN traffic is allowed in this mode.Trunk Multiple VLANs—Multiple VLANs are supported in this mode.Access Single VLAN—Single VLAN traffic is allowed in this mode.Trunk Multiple VLANs—Multiple VLANs are supported in this mode.Single VLAN
VLAN VLANID to be associated with the Ethernet port. 1 to40941
Port SpeedSpecifies the port speed in Mbps.Following values are supported:Auto10 Mbps100 Mbps1000 Mbps2500 Mbps5000 Mbps– Auto
Port DuplexSpecifies the type of duplex communication configured– FullthDuplex port.Following values are supported:Full DuplexHalf DuplexDuplex
Tunnel ModeOnly applicable for Ethernet ports 2, 3, and 4.Specifies whether tunneling of wired traffic is enabled or not.

Figure 47 Ethernet Ports parameters

Port Control—802.1X Authentication

802.1X authentication on Ethernet ports enhance the network security of the AP. The AP supports port-based authentication in the single-host authentication mode. In this mode, only one client is all access the network after successful 802.1X port-based authentication. After successful authentication, the port VLAN is assigned based on RADIUS assigned VLAN.

Cambium Networks XE5-8 - Port Control—802.1X Authentication - 1

Note

- 802.1X port-based authentication does not support CoA messages.

802.1X port-based authentication requires a RADIUS AAA server for authentication and accounting.

The following table lists the parameters for configuring the RADIUS AAA server on Ethernet ports and on the AP Groups > Network > Ethernet Ports > RADIUS Server page.

Table 44 RADIUS Server parameters

Parameters Description Range Default
Authentication ServerSpecifies the authentication server details, such as:Host—IPv4 or IPv6 address or hostname of theSecret—Text string that is used to encrypt data packets shared between the AP and the sever.Text stringPort—Port number of the authentication server.A maximum of three RADIUS authentication servers configured.- Disabled server in RADUS Format—Default—can be
Accounting ServerSpecifies the accounting server details, such as:Host—IPv4 or IPv6 address or hostname of theSecret-Text string that is used to encrypt data packets shared between the AP and the sever. Text stringPort-Port number of the accounting server. Default-1813A maximum of three RADIUS accounting servers can be configured.- Disabled serverin RADUS Format-US
Timeout Time(in seconds) to wait for a response from the RADIUS server.US-30 3
Attempts Number of retry attempts for contacting the RADIUS server.1-3 1
Accounting ModeSpecifies the accounting mode to be used. The following modes are supported:Start-Stop-Accounting packets are transmitted by the AAA server when a wireless client is connected and when the client disconnects.Start-Interim-Stop-Accounting packets are transmitted by APs to the AAA server when a wireless client connects, then at regular intervals (configured in the Interim Update Interval field) and also when the client disconnects.None-Disables the accounting mode. This is the default mode.None (Disabled)
Server Pool ModeUsers can configure multiple Authorization and Accounting Failover servers. Based on a number of wireless stations, the user choose Failover mode.Load Balance-AP equally distributes the requests between the configured RADIUS servers,Failover-AP selects the RADIUS server that is functional based on the order of configuration.Functional can
Interim update intervalTime (in seconds) to wait for sending RADIUS interim accounting update packets.Note: This interval is applicable only when you select the Start-Interim-Stop option in the Accounting Mode parameter.m0-655351800
Dynamic AuthorizationThis option is required, where there is CoA request- disabled AAA/RADIUS server.Disabled

Figure 48 RADIUS Server parameters
AP Groups > Add New Basic Management Radio Network Security Access Control Services User-Defined Overrides RADIUS Server Authentication Server 1. Host Secret Port* Show 18/2 2. Host Secret Port* Show 18/2 3. Host Secret Port* Show 18/2 Timeout 3 Traintout in seconds for each request attempt (1-30) Attempts 1 Number of attempts before giving up (1-3) Accounting Server 1. Host Secret Port* Show 18/3 2. Host Secret Port* Show 18/3 3. Host Secret Port* Show 18/3 Timeout 3 Traintout in seconds for each request attempt (1-30) Attempts 1 Number of attempts before giving up (1-3) Accounting Mode None Configure accounting mode Server Pool Mode Load Balance Load balance requests equally among configured servers Follower Move down server list when earlier servers are unreachable Interim Update Interval 100 Interval for RADIUS Interim-Accounting updates [10-65535 Seconds] Dynamic Authorization Enable RADIUS dynamic authorization (COA, DM messages)

DHCP

Below table lists the fields that are displayed in the AP Groups > Network > DHCP page.

Figure 49 DHCP Pool parameters
AP Groups > Add New Basic Management Radio Network Security Access Control DHCP Pool Add Name DHCP Pool Address Range Default Router Domain Name DNS Address Network Lease No DHCP Pool/configured

Table 45 DHCP parameters

ParametersDescription Range Default
DHCP PoolSpecifies the DHCP pool ID. 1 to 16 -
Address RangeIndicates the start and end addresses for the DHCP Pool. - -
Default RouterSpecifies the default router IP address. - -
Domain NameSpecifies the domain name for the DHCP pool. - -
DNS AddressSpecifies the primary and secondary addresses of the for a DHCP pool.DNS server
Network Specifiesifies the network IP address and subnet mask for the DHCP pool.--
Lease Duration(in days, hours, and minutes) for which the IP address be leased to the client.--
Add Bind List
For every DHCP pool configured, the user can bind MAC and the address pool defined, so that the wireless station gets the IP address every time they connect. Following parameters are required to bind IP address:MAC AddressIP Address-IP from same

Figure 50 Add DHCP window
Add DHCP DHCP Pool Add Number Please enter Post ID (1 to 5) Address Range: Test End IP address range is set assigned to clients Default Request Domain Name DNS Address Windows Security Domain name for the client Network IP Mail Report and network mode of the DHCP address press Linker 1 New Web Leave time steps (beaver intervals) Bind List MAC IP No Bind List configuration MAC IP Address Add

Tunnel

The following table lists the fields that are displayed in AP Groups > Network > Tunnel page.

Figure 51 Tunnel - L2TP parameters
AP Groups > Add New Basic Management Radio Network Security Access Control Services User-Defined Overrides Tunnels Basic Settings Tunnel Encapsulation L2TP L2TP Remote IP IP address or domain Username admin Password ...... Show Authentication Type Default TCP MSS 1400 TCP Maximum Segment Size (422-1410 bytes) PMTU Discovery Enable Path Maximum Transmission Unit discovery to avoid IP fragmentation LOGRE

Figure 52 Tunnel - L2GRE parameters
AP_Groups > Add New Basic Management Radio Network Security Access Control Services User-Defined Overrides Tunnels Basic Settings Tunnel Encapsulation L2GRE L2TP L2GRE Remote IP IP address or domain DSCP 0 Differentiated Service Code Point TCP MSS 1410 TCP Maximum Segment Size (472-1460 bytes) PMTU Discovery Enable Path Maximum Transmission Unit discovery to avoid IP fragmentation MTU 1460 Configure MTU for L2GRE tunnel (850-1460 bytes) Cambium GRE Enable Cambium Generic Routing Encapsulation GRE in UDP Enable GRE in UDP encapsulation

Table 46 Tunnel parameters

Parameters DescriptionRange Default
Tunnel EncapsulationProvision to enable tunnelFollowing tunnel types aresupported by Enterprise Wi-Fi devices:L2TPL2GREOFFtypeOFFAP
L2TP
Remote IP ConfigureL2TP end point. IPv4address or Primary hostname ofthe endpoint is supported.--
Username andPasswordCredentials required for L2TP authentication.-admin/admin
Authentication TypeProvision to select the PPP authentication method.Following are the options available:DEFAULTCHAPMS-CHAPMS-CHAPv2PAP- DEFAULT
TCP MSS TCP Maximum Segment Size (MSS) in bytes.422- 1410 1400
PMTU Discovery Provision to enable to discover PMTU in network.- Enabled
L2GRE-1You can configure a maximum of two L2GRE tunnels. Configure L2GRE-1 tunnel by parameters in the AP Groups > Network > Tunnel tab. However, configuring L2GRE-2 tunnel is allowed only using the device CLI. The following parameters for L2GRE-1 are also applicable
Parameters Description Range Default
Remote IP Configure L2GRE endpoint. IPv4 address or primary hostname of an endpoint is supported.--
DSCP Users can configure priority of GRE packets.- 0
TCP MSS TCP Maximum Segment Size (MSS) in bytes.472-1460 1410
PMTU Discovery Provision to enable to discover PMTU in a network.--
MTU Maximum Transmission Unit in bytes.850-1460 1460
GRE in UDP GREprotocol is designed to establish a tunnel between third-party vendor which complies with RFC 8086.- Disabled any

Point-to-Point Protocol over Ethernet (PPPoE)

PPPoE provides the ability to establish a connection to ISP with user authentication. Below table lists fields that are displayed in AP Groups > Network > PPPoE page.

Figure 53 PPPoE parameters
AP Groups > Add New Basic Management Radio Network Security Access Control Services User-Defined Overrudes PPPoE Basic Settings Enable VLAN ID 1 Vlan ID assigned to PPPoE Service Name Configure PPPoE service-name parameters (max 32 characters) Authentication Info Username admin Password ...... Show MTU 1402 Configure MTU for PPPoE connection (500.1492 bytes) TCP MSS Clamping Enable TCP Maximum Segment Size Clamping to avoid packet fragmentation Management Access Enable CLI/GUI/SNMP access via this interface

Table 47 PPPoE parameters

Parameters Description Range Default
Enable Provision to enable PPPoE client. - Disabled
VLAN ID Users can configure VLAN ID where PPPoE clients should obtain an IP address.ould-
Service NameConfigure PPPoE service name. - -
Authentication InfoProvision to configure credentials required for PPPoE authentication.admin/admin
MTU MaximumTransmission Unit. 500-14921492
TCP-MSS ClampingConfigure PPPoE endpoint. Either IP or hostname endpoint is supported.of Enabled
Management AccessIf enabled, the user can access the device either - disabled or SSH with PPPoE IP.- disabled or

VLAN Pool

The following table lists the fields that are displayed in AP Groups > Network > VLAN Pool page.

Table 48 The VLAN Pool parameters

ParametersDescriptionRangeDefault
VLAN Pool NameName for the VLAN pool.--
VLAN ID ListList of VLAN IDs for the VLAN pool.You can configure either a single VLAN ID or multipleMultiple VLAN IDs can be configured either separated by hyphen. For example, 2-7, 45, 67.-VLANIDs.comma or

Figure 54 The VLAN Pool parameters
AP Groups > Add New Management Radio Network Security Access Control Services VLAN Pool Add New VLAN Pool Name VLAN ID List No VLAN Pool configured

Wireless Wide Area Network (WWAN)

The following table lists the fields that are displayed in Configure > Network > WWAN tab.

Cambium Networks XE5-8 - Wireless Wide Area Network (WWAN) - 1

Note

This feature is supported in XV2-2, XV3-8, XE3-4, and XE5-8 platforms only.

Table 49 WWAN parameters

Parameters Description Range Default
WWAN Provision to enable wireless WAN using a USB cellular dongle for internet access.--
Failover OnlyFailover only can be configured in two modes:Enabled: Ethernet will be the primary connection and WWAN will be backup.Disabled: 3G/4G (WWAN) will be the only working connection.Note: Cellular link can be configured as backupEthernet connection.- Enabledonly to
APN Provisionto configure network provider APN address. - -
Authentication InfoProvision to configure credentials required for WWAN authentication.AN admin/admin
Monitor HostRunning a check in the background that constantly-a user configured IP address (example: 8.8.8.8) for reachability through ping.-monitors-

To configure the above parameter, login to cnMaestro AP Group > Network > WWAN tab and provide the details as given below:

  1. Enable WWAN check box to enable this functionality.
  2. Check/Uncheck Failover Only to enable/disable.
  3. Enter the APN address in the text box.
  4. Enter the Authentication credentials.
  5. Enter any IPv4 address to Monitor Hoist text box.
  6. Click Save.

Figure 55 WWAN parameters
AP Groups > Add New Basic Management Radio Network Security Access Control Services User-Defined Overrides WWAN WWAN Enable Wireless WAN using a USB cellular dongle for internet access. Fallover Only Use WWAN as backhaul only when fallover is triggered APN Configure network provider APN address Authentication Info Username Password Show Monitor Host Host to monitor in order to trigger WWAN fallover

Supported hardware

Cambium Networks currently support the following models, where local laws permit:

- Huawei

E8372

E3372

- Alcatel

- Link Key 4G IK40V (recommended)

• ZTE

MF833V

Configuring Access Control

The Access Control page allows the users to enable or assign access control policies and configur group policies and device policies. It offers visibility into the configured rules, ensuring efficient and network management.

Figure 56 Access Control page
AP_GroupS > GE_TEST Dashboard Notifications Configuration Statistics Reports X Devices Clients Mesh Fees Basic Management Radio Network Security Access Control Services User-Defined Overloads Access Control Enable Access Control Access Control Policy Access Control Policy and Definition at Wi-Fi Policy, Access Control Policy, User Group Policy Apply Filters Add Now Policy Name RADIUS Filter-ID Access Control Policy VLAN No Data Available Device Policy Apply Filters Add Now Policy Name Device Class Device Type Access Control Policy No Data Available Showing 0.0 Total 0 10 Positive Next

Cambium Networks XE5-8 - Configuring Access Control - 2

Note

If an Access Control Policy is assigned at the AP group level, it does not appear unGroup or Device Group policies.

This chapter describes the following topics

• Enabling Access Control Policy
- User Group Policy
• Device Policy

Enabling Access Control Policy

Users have the provision to enable or disable access control policies under Access Control tab.

Figure 57 Enabling Access Control Policy
Access Control Enable Access Control Access Control Policy test View Rules

Users can select the available access control policies listed in the Wi-Fi profiles in the Access Control Policy drop-down list. They can also view the configured rules associated with these policies by clicking View Rules. This provides a comprehensive view of the policies and rules within the network.

Figure 58 Access Control Policy Rules
View Access Control Policy Rules Air Cleaner Rules MAC Filtering Rules Apply Filter(s) No Data Available IP and Application Filtering Rules Apply Filter(s) Name Status Action Type Application / Category Protocol Sour... Source IP Mask Destinati... Destination IP Mask Schet Iperf_app Enabled ● Allow Layer7-filter iperf - - - - speedtest_APP Enabled ● Allow Layer7-filter speedtest.net - - - - allow_Instagram Enabled ● Allow Layer7-filter Instagram - - - - ap_gp_demy_ndtv Enabled ● Dany Layer7-filter NDTV - - - - Ap_Gp_allow_whatsapp Enabled ● Allow Layer7-filter WhatsApp - - - - Ap_GP_Allow_Facebook Enabled ● Allow Layer7-filter Facebook - - - -

User Group Policy

User group policies allow you to categorize users into specific roles with customized access permissions and restrictions, facilitating a fine-tuned control over network access.

To add a new to User Group Policy, perform the following steps:

  1. Navigate to Configuration > Wi-Fi Profiles > AP Groups > Access Control page.
  2. Click Add to create a new AP group.
  3. Click the Access Control tab in the Add New page.
  4. Click Add New in the User Group Policy section.

Figure 59 User Group Policy
AP Groups > Add New Basic Management Radio Network Security Access Control Services User Group Policy Apply Filter(s) Policy Name IRADIUS Filter.ID Access Control Policy VLAN Add New No Data Available Showing 0 - 0 Total 0 10 Previous Next 1

  1. Complete the details in the Add User Group window.

Figure 60 Add User Group
Add User Group Name* RADIUS Filter-ID* Access Control Policy None Only Non-MAC Based Policy will be displayed here VLAN Cancel Add Now

Cambium Networks XE5-8 - User Group Policy - 3

Note

- The user must assign an Access Control Policy or VLAN to create a User Group

• A maximum of 64 User Group Policies are supported.

- Users can select Access Control Policies with non-MAC filters only from the Access Control Policy drop-down list.

- Mapping an Access Control Policy to a User Group Policy enables its use for the group, and vice versa. However, the same Access Control Policy cannot be shared between the User Group Policy and the AP group. You can apply it either to the Group Policy or to the AP group only.

Device Policy

Device Policy allows users to apply specific rules and access control policies based on the type a characteristics of devices, offering customized control over device behavior within the network.

To add a new Device Policy, perform the following steps:

  1. Navigate to Configuration > Wi-Fi Profiles > AP Groups tab.
  2. Click Add to create a new AP group.
  3. Click the Access Control tab in the Add New page.
  4. Click Add New in the Device Policy section.

Figure 61 Device Policy
AP Groups > Add Now Management Radio Network Security Access Control Services User-Defined Overdrafts Device Policy Apply Filters Add Now Policy Name Device Class Device Type Access Control Policy No Data Available Showing 0 - 0 Total: 0 IO Previous Next

  1. Complete the details in the Add Device Policy window.

Figure 62 Add Device Policy
Add Device Policy Name* Device Class* Any Device Type* Any Access Control Policy* None Only Non-MAC Based Policy will be displayed here Cancel Add New

Cambium Networks XE5-8 - Device Policy - 3

Note

• A maximum of 64 Device Policies are supported.
- Users can select Access Control Policies with non-MAC filters only from the Access Control Policy drop-down list.

Managing Filters

This chapter describes the following topics:

  • Overview
  • Filter list
    • Device class filter
    • Wi-Fi Calling support
  • Air cleaner

• Application control Premium feature

Overview

Filters are used to define the rules used for blocking or passing traffic and also to change QoS/ rate-limiting for selected traffic.

The Wireless AP's integrated firewall uses stateful inspection to accelerate the decision of whether t or deny traffic user connections managed by the firewall are maintained statefully. Once user flow established through the AP, it is recognized and passes through without the application of all defin filtering rules. Stateful inspection runs automatically on the AP.

Filter list

Filters are organized in groups, called filter lists. A filter list allows users to apply a uniform set SSIDs. AP supports 16 filter lists and each filter list supports 50 filter rules in precedence order.

Filters

These settings create and manage filters with precedence that belong to the current filter list, base filter criteria you specify.

Filters can be configured in Layer 2 and Layer 3 or application/category control (Layer 7). Layer 2 high precedence over Layer 3 application control and Layer 2 supports MAC/IP/protocol-based rules.

Filters are an especially powerful feature when combined with the intelligence provided by the Application

Control Windows.

Based on Application Control's analysis of your wireless traffic, you can create filters to enhance w usage for your business needs:

  1. Usage of non-productive and risky applications like BitTorrent can be restricted.
  2. Traffic for mission-critical applications like VoIP and WebEx may be given higher priority (QoS).

  3. Non critical traffic from applications like YouTube may be given lower priority (QoS) or bandwidth allowed may be capped per station or for all stations.

Configuring filter CLI

By configuring the filter CLI, the user can define ACL rules for blocking or passing traffic, DSCP/G modifying packets, and rate-limiting for selected traffic.

  1. Create filter list/filter profile using global filter command (Filter: configure filter parameters).
ap(config)# filter
filter-list : Configure filter list
global-filter : Configure Global filter parameters 
  1. Global-filter is for global rules in AP. Global-filter includes the below options:
ap(config-global-filter)#
air-cleaner : Configure Preset air cleaner filters
application-control : Enable application control
clear : Clear command
disable : Disable filter list
filter : Configure filter rules in precedence order
stateful : Enable stateful filtering
apply : Apply configuration that has just been set
exit : Exit from filter list configuration
no : Delete/disable filter list parameters
save : Save configuration to Flash so it persists across reboots
show : Show command 
  • Stateful filtering : Stateful operation of the integrated firewall can be Enabled or Disabled. By default, it is enabled.
  • Application Control: Operation of the Application Control feature may be Enabled or Disabled.
  • Disable: Disable or enable filter list.

  • Each filter list includes below options:

clear : Clear command
disable : Disable filter list
filter : Configure filter rules in precedence order
name : Name of filter list

apply : Apply configuration that has just been set
exit : Exit from filter list configuration
no : Delete/disable filter list parameters
save : Save configuration to Flash so it persists across reboots
show : Show command 

Cambium Networks XE5-8 - Configuring filter CLI - 1

Note

Global-filter rules will take precedence over filter-list rules

- Global filter and filter-list can include 50 filter rules with precedence order.

ap(config-filter-list-1)# filter precedence {1-50} 
  1. Then create filter rule from precedence level (1 to 50).
(config-list-1-filter-precedence-1)# exit
(config-filter-list-1)# filter precedence 1
(config-list-1-filter-precedence-1)#

application-control : Configure application control filters
category-control : Configure application category control filters
clear : Clear command
disable : Disable filter
layer2-filter : Configure Layer2 filter
layer3-filter : Configure Layer3 filter
logging : Enable filter logging
rate-limit : Set traffic limit for this filter
schedule : Schedule Layer3 rules
wlan-to-wlan : Restrict 'in' direction rule's egress direction as wlan

apply : Apply configuration that has just been set
exit : Exit from custom filter configuration
no : Disable the filter options
save : Save configuration to Flash so it persists across reboots
show : Show command 

Cambium Networks XE5-8 - Note - 1

Note

The filter type is either Layer 2 or Layer 3 or application control can be added in o precedence level.

  1. Layer 3 filter has the below provisions.
(config-list-1-filter-precedence-1)# layer3-filter

deny : Drop packet matching the rule
permit : Allow packet matching the rule
set-dscp : Set DSCP value to packet matching the rule
set-qos : Set QOS value (0-3) to packet matching the rule 
  • QoS Premium feature: Set packets QoS level (0 to 3). Level 0 has the lowest priority; level 3 highest priority
  • DSCP Premium feature Differentiated Services Code Point or DiffServ (DSCP). DSCP level (0 to 63. Level 0 has the lowest priority and level 63 has the highest priority.
  • Rate limit Premium feature: Filters support rate limiting per station or all stations and support Kbps/Mbps/pps.
  • Schedule Premium feature: Filter support scheduling the activation of the layer3 /application control rules based on the day and local time selected.
  • Disable: Each filter and filter list can be turned on/off.

Cambium Networks XE5-8 - Note - 1

Note:

Application Control, QoS, DSCP, Schedule and Rate limit are Premium features.

  1. Each layer 3 rule category has below types
(config-list-1-filter-precedence-1)# layer3-filter set-dscp
ip : IPV4 address based rule
ip6 : IPV6 address based rule
proto : Protocol based rule
proto6 : IPv6 Protocol based rule 
  1. For proto or port number-based rule, select proto.
(config-list-1-filter-precedence-1)# layer3-filter set-dscp proto
layer3-filter set-dscp proto (tcp|udp|icmp|igmp|srp|sctp|any) (SOURCE-IP{//mask|prefix-length}|any) (SOURCE-PORT|any) (DESTINATION-IP{//mask|prefix-length}|any) (DESTINATION-PORT|any) (in|out|any) (DSCP{0-63}) <(optional)//Filter_name> 

Cambium Networks XE5-8 - Note - 2

Note

All fields are mandatory. If no parameter to configure, give 'any'. direction of the rule. if it is 'in', the rule is applicable for traffic. If it is 'out', the rule is applies for traffic to wireless.

Direction is the from the wireless sid

  1. For non-proto or port number-based rules, select IP.
(config-list-1-filter-precedence-1)# layer3-filter set-dscp ip
layer3-filter set-dscp ip (SOURCE-IP{//mask|prefix-length}|any) (DESTINATION-IP{//mask|/prefix-length}|any) (in|out|any) (DSCP{0-63}) <(optional)//Filter_name> 
  1. Layer 2 filter has below options:
(config-list-1-filter-precedence-11)# layer2-filter
deny : Drop packet matching the rule
permit : Allow packet matching the rule 
  1. Each layer 2 rule category has below two cases.
(config-list-1-filter-precedence-11)# layer2-filter permit
mac : Mac or IP based Rule with out Protocol
proto : Mac or IP based rule with Protocol 

Layer 2 rule supports IP, MAC, Port, or Protocol-based rules.

  1. ap(config-list-1-filter-precedence-1) # layer2-filter permit mac
(config-list-1-filter-precedence-1)# layer2-filter permit mac
layer2-filter permit mac (SOURCE-MAC/IPv4/IPv6{(optional)/{mask|prefix-length}}|any)(DESTINATION-MAC/IPv4/IPv6{(optional)/{mask|prefix-length}}|any) (in|out|any) <(optional)//Filter_name> 

Example:

e.g. layer2-filter permit mac 00-01-02-03-04-05 00-01-02-09-08-07 any //filter_to_allow_guest
'!!' for not e.g. layer2-filter permit mac 00-01-02-03-04-05 !00-01-02-09-08-07 out
layer2-filter permit mac !1.1.1.1/8 any any 
  1. ap(config-list-1-filter-precedence-1) # layer2-filter permit proto
(config-list-1-filter-precedence-1)# layer2-filter permit proto
layer2-filter permit proto (tcp|udp|arp|icmp|igmp|srp|sctp|any) (SOURCE-MAC/IPv4/IPv6/{mask|prefix-length})|any) (SOURCE-PORT|any) (DESTINATION-MAC/IPv4/IPv6/{mask|prefix-length})|any) (DESTINATION-PORT|any) (in|out|any) <(optional)//Filter_name> 

Example:

e.g layer2-filter permit proto tcp any any 10000 any //filter_permit_guest
'!! for not e.g layer2-filter permit proto tcp any any !00-00-11-11-11-11 10000 out
layer2-filter permit proto tcp 1.1.1.1 1000 00:11:22:33:44:44/ff-ff-ff-00-00-00 5000 any 

Sample configuration

filter global-filter
stateful
application-control

filter filter-list 1
    filter precedence 1
    layer3-filter set-qos ip any 9.9.9.9 in 2
    rate-limit all Mbps 500
    exit
    filter precedence 2
    layer3-filter deny ip 5.5.5.5 6.6.6.6 any
    exit
    filter precedence 3
    layer3-filter permit ip any any any
    exit
    filter precedence 4
    layer3-filter permit ip 9.9.9.9 any any
    exit 
  1. To attach the filter list into the WLAN profile, filter-list < filter-list ID>.
wireless wlan 1
ssid cambium-guest
no shutdown
vlan 1
filter-list 1 
  1. To show filter statistics:
(config)# show filter-statistics
Filter ID | global 

Device class filter

This feature applies wireless policies to the client-based device class (notebook, phone, tablet, and its type (Windows, Mac, and Android).

CLI configuration:

ap(config)# device-class-filter 1
ap(config-device-class-filter-1)# class
ap : Configure filter rules for the AP device class
appliance : Configure filter rules for the appliance device class
desktop : Configure filter rules for the desktop device class
game : Configure filter rules for the game device class
notebook : Configure filter rules for the notebook device class 
phone : Configure filter rules for the phone device class
player : Configure filter rules for the player device class
tablet : Configure filter rules for the tablet device class
ap(config-device-class-filter-1)# class notebook
all : Configure filter rules for all notebook device classes
chrome : Configure filter rules for the Chrome-OS device type
linux : Configure filter rules for the Linux device type
mac : Configure filter rules for the Mac device type
windows : Configure filter rules for the Windows device type
ap(config-device-class-filter-1)# class notebook linux
ap(config-device-class-filter-1)# filter-list
Filter list ID <1-16> or Name 

Wi-Fi Calling support

Cambium Networks Access Point has the inbuilt application visibility engine, which can detect Wi-Fi and provide better call quality by reducing the latency, jitter, and roaming delays for voice calls of

When the Access Point detects the Wi-Fi calling traffic, it classifies and puts the traffic in the voi queue for achieving better call quality.

CLI configuration:

filter precedence 5
application-control wificall set-qos 3 

Cambium Networks XE5-8 - CLI configuration: - 1

Note

Filter precedence can be from 1 to 50.

Air cleaner

The Air Cleaner feature offers several predetermined filter rules that eliminate a great deal of unne wireless traffic.

Configuration CLI:

ap(config)# filter global-filter
ap(config-global-filter)# air-cleaner
all : All air cleaner filters
arp : Eliminate station to station ARPs over the air
broadcast : Eliminate broadcast traffic from the air
dhcp : Eliminate stations serving DHCP addresses from the air 
multicast : Eliminate chatty multicast traffic from the air
When we configure the Air Cleaner rule, pre-defined filter rules will get popular shown below:
ap(config-global-filter)# air-cleaner all
ap(config-global-filter)# show config filter
!
!
filter global-filter
stateful
application-control
air-cleaner all
filter precedence 1
layer2-filter deny proto arp any any in //Air-cleaner-Arp.1
wlan-to-wlan
exit
filter precedence 2
layer2-filter deny proto udp any any FF:FF:FF:FF:FF:FF 67 out //Air-cleaner-Dhcp.1
exit
filter precedence 3
layer2-filter deny proto udp any any FF:FF:FF:FF:FF:FF 68 in //Air-cleaner-Dhcp.2
exit
filter precedence 4
layer2-filter permit proto arp any FF:FF:FF:FF:FF:FF any //Air-cleaner-Bcast.1
exit
filter precedence 5
layer2-filter permit proto udp any any FF:FF:FF:FF:FF:FF 67 any //Air-cleaner-Bcast.2
exit
filter precedence 6
layer2-filter permit proto udp any any FF:FF:FF:FF:FF:FF 68 any //Air-cleaner-Bcast.3
exit
filter precedence 7
layer2-filter permit proto udp any any FF:FF:FF:FF:FF:FF 22610 any //Air-cleaner-Bcast.4
exit
filter precedence 8 
layer2-filter deny mac any FF:FF:FF:FF:FF:FF any //Air-cleaner-Bcast.5
exit
filter precedence 9
layer2-filter permit mac any 01:00:5E:00:00:FB any //Air-cleaner-mDNS.1
exit
filter precedence 10
layer2-filter deny mac any multicast any //Air-cleaner-Mcast.1
exit 

Cambium Networks XE5-8 - Configuration CLI: - 1

Note

In Mesh link configuration, the Air Cleaner rules need customization like disabling Precedence 2 and Precedence 3 (DHCP rules).

Application control Premium feature

The Application Control feature provides real-time visibility of application usage by users across the network. Network usage has changed enormously in the last few years, with the increase in smart tablet usage stressing networks. Increasing traffic from legitimate business needs such as cloud- and based applications, streaming media, and VoIP must be handled with an adequate quality of experie achieve this purpose Application Control filters are used to define the rules used for blocking or change QoS/DSCP and rate-limiting for the specific Application or a specific category of application. more details, refer to the Application Control Filters section in the user guide

Application Control can track application usage over time to monitor trends. Usage may be tracked VLAN, or station. Many hundreds of applications are recognized and grouped into a number of cat. The distributed architecture of Cambium Enterprise APs allows Application Control to scale naturally a grow the network.

This topic describes the following content:

• Deep Packet Inspection (DPI)

• Application control policy

- Risk and productivity

Selection criteria

- DPI CLI configuration

- Global application policy

- SSID application policy

- Custom Applications X

Deep Packet Inspection (DPI)

The AP uses Deep Packet Inspection (DPI) to determine what applications are being used and by how much bandwidth they are consuming. These applications are rated by their degree of risk and productiveness. Filters can be used to implement per-application policies that keep network usage focus on productive uses.

Application control policy

When you find risky or unproductive applications consuming bandwidth on the network, you can ease create Filters to control them. You may use filters to:

  • Block problematic traffic, such as BitTorrent or Y8.
  • Prioritize mission-critical traffic: By increasing the QoS assigned to the traffic, applications like Vol WebEx may be given higher priority (QoS).
  • Lower the priority of less productive traffic: Use filters to decrease the QoS assigned to traffic applications like YouTube and Facebook.
  • A nonproductive specific application can be rate-limited to avoid impact on the productive application (for example, YouTube streaming can be rate-limited to avoid impact on applications like VoIP)

Risk and productivity

Application control ranks applications in terms of their levels of risk and productivity.

Productivity: Indicates how appropriate an application is useful for business purposes. The higher the number, the more business-oriented an application is:

  1. Primarily recreational
  2. Mostly recreational
  3. Combination of business and recreational purposes
  4. Mainly used for business
  5. Primarily used for business

Risk: indicates how likely an application is to pose a threat to the security of your network. The rating number, the riskier of an application is:

  1. No threat
  2. Minimal threat
  3. Some risk: maybe misused
  4. High risk: maybe malware or allow data leaks
  5. Very high risk: threat circumvents firewalls or avoids detection

Selection criteria

From the AP CLI, the below options are available to view the Application Statistics:

  • Application: This gives detailed information about the application seen from the wireless traffic.
  • Category: This gives the combined statistics of the application which belongs to a particular category (for example, Games, Network monitor).
Config)# show application-statistics by-application
Applications Count = 24
Application Statistics for All Applications
Protocol or ApplicationProductivity Index & RiskTX PacketsTX BytesRX PacketsRX Bytes
Ad Analytics4142203231
Amazon217531437698337
Bonjour41151737141664
Doubleclick1184301906512228
Google Ads31103471367812223
Google Analytics41133750151711
Google APIs3147136288091892153251
Google312544324891556848664
Google Play3135039645618115261
Mozilla315444708485854
NetBIOS NS130012936
NTP1321522152
OCSP31636404715247
OpenX11328374273507
Quantcast11144733172341
Rapleaf31196745192288
Reddit311227147759675274695
Scorecard Research11265876272748
SSDP41329146086204000
SSL3322613643517622509
TCP31237616174711665330377
Twitter347953301687532
Wikipedia33193126283873
YouTube1495263939912233

ap(config)# show application-statistics by-category Application Categroy Statistics for All Applications

Application Productivity TX TX RX RX category Index & Risk Packets Bytes Packets Bytes

File-Transfer 1 1 81 17881 0 0 Mail 3 1 1351 1057897 1318 155897 Messaging 2 2 633 245164 558 68508 Network-Monitoring 3 4 43 2580 1 60 Networking 3 1 51911 4422799 2524 1488418 Proxy 2 2 8637 7892737 6454 1008520 Social-Networking 2 3 52038 68131289 19772 2285979 Streaming-Media 2 3 15030 18700791 9156 1366044

Web-Services 2 2 38872 26757562 32219 7094216

- SSID: This gives the application list seen on a particular SSID. The SSID number is the BSS index configured.

ap(config)# show application-statistics by-application ssid 1
Applications Count = 79
Application Statistics for wlan index 1

================

Protocol or Productivity TX TX RX RX
Application Index & Risk Packets Bytes Packets Bytes

================

Ad Analytics 4 1 221 113639 204 27874
Admeta 4 1 20 8577 17 3470
Aggregate Knowledge 4 1 72 25718 67 11423
Amazon 2 1 1245 773227 1307 413188
Amazon Web Services 1 2 2102 2543236 1522 111343
Amp 4 1 163 144673 157 16258
AOL Ads 3 1 21 11459 24 3769
Appier 4 1 39 13552 26 5046
AppNexus 1 1 172 72763 167 62363
Bing 3 1 17 8140 12 1175
Bluekai 1 1 35 13127 23 2856
Bonjour 4 1 0 0 1067 332560
Casale 3 1 97 36559 85 12244
CloudFlare 3 2 31 12537 20 2286
Captive Network Ass 2 1 18 1194 10 918
Connexity 3 1 22 13348 27 3954
Contextweb 4 1 81 41240 100 20963
Criteo 4 1 376 171618 396 60013
Crashlytics 1 1 74 29571 82 10660
Doubleclick 1 1 3549 2691946 2587 759544
DHCP 4 1 52 17212 0 0
Dotomi 4 1 59 21308 64 8324
Drawbridge 4 1 28 6164 23 4780
Facebook 2 1 6053 5188935 4732 1217723 
Facebook Messages 2 2 202 71996 150 18393
Facebook Video 2 3 44585 61497202 14049 941942
Flurry 3 1 17 5694 27 15624
Font Awesome 4 1 94 98415 88 5341
gmail 3 1 1351 1057897 1318 155897
Google Ads 3 1 1356 903620 1066 123597
Google Analytics 4 1 475 165753 407 91298
Google APIs 3 1 5437 2829186 4775 1605169
GoogleDuo 4 1 84 22238 82 23226
Google 3 1 5381 3955811 4385 799374
Google Play 3 1 980 242763 880 254459
Google Video 2 2 0 0 20 23771
hotstar 1 4 100 64443 82 21328
HTTP 3 1 1184 371037 1100 173347
HTTP 2.0 3 1 1410 360603 1271 232993
HTTP VIDEO 3 2 3801 5360601 1841 105901
HWCDN 3 1 213 259756 200 12745
ICICI Bank 2 2 29 33613 21 2025
ICMP 3 4 5 300 1 60
Instagram 1 1 322 330979 242 33346
Krux 1 1 71 31719 53 6993
Lotame 1 1 109 63865 84 10168
MDNS 3 1 0 0 86 21324
Media Innovation Gr 3 1 45 14819 40 5662
Media Math 1 1 25 5413 8 1034
Mixpanel 3 1 451 139375 496 275463
NrData 4 1 371 56753 341 108525
NTP 1 3 1 76 1 76
OpenX 1 1 113 20680 86 12298
Outbrain 3 1 34 16363 46 6344
OwnerIQ 3 1 38 8977 29 5783
Paytm 2 3 2015 2201287 1177 146483
Psiphon 2 2 8562 7869967 6392 983509
PubMatic 3 1 331 103338 262 57072
Quantcast 1 1 47 23413 47 9495
Quic 3 1 0 0 817 1052805
Rapleaf 3 1 66 28602 65 8000
Rubicon Project I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 
Scorecard Research 1 1 96 35762 90 12758
Smart AdServer 3 2 35 13345 45 6116
SpotXchange 3 2 59 14418 49 14522
SSDP 4 1 0 0 287 43911
SSL 3 3 6029 4347809 5173 1029629
Taboola 3 2 2177 2715316 1082 123164
TCP 3 1 169 37436 194 26160
The Trade Desk 3 1 101 67145 67 13168
Turn 1 1 71 31424 81 9438
Twitter 3 4 867 1040706 593 73816
UDP 3 1 0 0 62 10664
Ultrasurf 2 2 31 10286 19 1848
WhatsApp Media Mess 2 2 145 167080 135 10680
WhatsApp 2 2 404 55846 341 34602
Xiaomi 3 1 1244 718018 1376 285219
Yahoo 3 3 204 77608 251 48694
YouTube 1 4 11031 13254451 7129 1156065 

- Display for Station: This gives detailed information about a particular station. Provide the station MAC address the user wants to check for statistics.

- Tx means downlink traffic concerning AP and Rx mean uplink traffic with respect to AP.

(config)# show application-statistics by-application station D4-6A-6A-E7-D0-15Applications Count = 24Application Statistics for station D4-6A-6A-E7-D0-15
Protocol or ApplicationProductivity Index & RiskTX PacketsTX BytesRX PacketsRX Bytes
Ad Analytics4142203231
Amazon217531437698337
Bonjour4100151810
Doubleclick1184301906512228
Google Ads31103471367812223
Google Analytics41133750151711
Google APIs3147136288091892153251
Google312544324891556848664
Google Play3138740491621520326
Mozilla311176744610412051
NetBIOS NS130012936
NTP1321522152
OCSP31636404715247
OpenX11328374273507
Quantcast11144733172341
Rapleaf31196745192288
Reddit311235147848776177186
Scorecard Research11265876272748
SSDP4100285600
SSL3322613643517622509
TCP31277016752142075424531
Twitter347953301687532
Wikipedia33193126283873
YouTube141133233011615918

Below CLI command gives a list of stations present along with station count per VLAN.

(config)# show application-statistics debug ==================Station Count 1=================== MAC IP VLAN SSID 10.10.0.113 1 TIGER_XV3_8_OPEN_SSID ==================vlan count 1=================== VLAN STA_COUNT 1 1

ap(config)# show application-statistics debug
==================Station Count 3==================
MAC IP VLAN SSID
9A-FD-AA-B4-9C-8E 0.0.0.0 0
FC-D9-08-A4-D4-55 0.0.0.0 0
52-78-93-70-38-35 0.0.0.0 0
=================vlan count 1==================
VLAN STA_COUNT 

- Display for VLAN: This gives information about the particular VLANs.

Config)# show application-statistics by-application vlan 1Applications Count = 24Application Statistics for VLAN 1
Protocol or ApplicationProductivity Index & RiskTX PacketsTX BytesRX PacketsRX Bytes
Ad Analytics4142203231
Amazon217531437698337
Bonjour4100151810
Doubleclick1184301906512228
Google Ads31103471367812223
Google Analytics41133750151711
Google APIs3147136288091892153251
Google312544324891556848664
Google Play3139340537422120638
Mozilla311176744610412051
NetBIOS NS130012936
NTP1332283228
OCSP31636404715247
OpenX11328374273507
Quantcast11144733172341
Rapleaf31196745192288
Reddit311249148115077979476
Scorecard Research11265876272748
SSDP4100326400
SSL3322613643517622509
TCP31291016946162219455285
Twitter347953301687532
Wikipedia33193126283873
YouTube141153243411916137

ap(config)# show application-statistics by-application vlan 1

Applications Count = 79

Application Statistics for VLAN 1

Protocol or Productivity TX TX RX RX

Application Index & Risk Packets Bytes Packets Bytes

Ad Analytics 4 1 221 113639 204 27874

Admeta 4 1 20 8577 17 3470

Aggregate Knowledge 4 1 72 25718 67 11423

Amazon 2 1 1245 773227 1307 413188

Amazon Web Services 1 2 2102 2543236 1522 111343

Amp 4 1 163 144673 157 16258
AOL Ads 3 1 21 11459 24 3769
Appier 4 1 39 13552 26 5046
AppNexus 1 1 172 72763 167 62363
Bing 3 1 17 8140 12 1175
Bluekai 1 1 35 13127 23 2856
Bonjour 4 1 0 0 1067 332560
Casale 3 1 97 36559 85 12244
CloudFlare 3 2 31 12537 20 2286
Captive Network Ass 2 1 18 1194 10 918
Connexity 3 1 22 13348 27 3954
Contextweb 4 1 81 41240 100 20963
Criteo 4 1 376 171618 396 60013
Crashlytics 1 1 74 29571 82 10660
Doubleclick 1 1 3549 2691946 2587 759544
DHCP 4 1 52 17212 0 0
Dotomi 4 1 59 21308 64 8324
Drawbridge 4 1 28 6164 23 4780
Facebook 2 1 6053 5188935 4732 1217723
Facebook Messages 2 2 202 71996 150 18393
Facebook Video 2 3 44585 61497202 14049 941942
Flurry 3 1 17 5694 27 15624
Font Awesome 4 1 94 98415 88 5341
gmail 3 1 1351 1057897 1318 155897
Google Ads 3 1 1356 903620 1066 123597
Google Analytics 4 1 475 165753 407 91298
Google APIs 3 1 5437 2829186 4775 1605169
GoogleDuo 4 1 84 22238 82 23226
Google 3 1 5381 3955811 4385 799374
Google Play 3 1 980 242763 880 254459
Google Video 2 2 0 0 20 23771
hotstar 1 4 100 64443 82 21328
HTTP 3 1 1184 371037 1100 173347
HTTP 2.0 3 1 1410 360603 1271 232993
HTTP VIDEO 3 2 3801 5360601 1841 105901
HWCDN 3 1 213 259756 200 12745
ICICI Bank 2 2 29 33613 21 2025
ICMP 3  4  5  300  1  60 
Instagram 1 1 322 330979 242 33346
Krux 1 1 71 31719 53 6993
Lotame 1 1 109 63865 84 10168
MDNS 3 1 0 0 86 21324
Media Innovation Gr 3 1 45 14819 40 5662
Media Math 1 1 25 5413 8 1034
Mixpanel 3 1 451 139375 496 275463
NrData 4 1 371 56753 341 108525
NTP 1 3 1 76 1 76
OpenX 1 1 113 20680 86 12298
Outbrain 3 1 34 16363 46 6344
OwnerIQ 3 1 38 8977 29 5783
Paytm 2 3 2015 2201287 1177 146483
Psiphon 2 2 8562 7869967 6392 983509
PubMatic 3 1 331 103338 262 57072
Quantcast 1 1 47 23413 47 9495
Quic 3 1 0 0 817 1052805
Rapleaf 3 1 66 28602 65 8000
Rubicon Project 1 1 17 9524 24 7846
Scorecard Research 1 1 96 35762 90 12758
Smart AdServer 3 2 35 13345 45 6116
SpotXchange 3 2 59 14418 49 14522
SSDP 4 1 0 0 287 43911
SSL 3 3 6029 4347809 5173 1029629
Taboola 3 2 2177 2715316 1082 123164
TCP 3 1 169 37436 194 26160
The Trade Desk 3 1 101 67145 67 13168
Turn 1 1 71 31424 81 9438
Twitter 3 4 867 1040706 593 73816
UDP 3 1 0 0 62 10664
Ultrasurf 2 2 31 10286 19 1848
WhatsApp Media Mess 2 2 145 167080 135 10680
WhatsApp 2 2 404 55846 341 34602
Xiaomi 3 1 1244 718018 1376 285219
Yahoo 3 3 204 77608 251 48694
YouTube 1 4 11031 13254451 7129 1156065 

• Time frame: This gives information about the application seen in last the duration (for example, 1 day).

- For low-risk numbers, the productivity is high and vice versa. (example, for GitHub (shown in the figure) the risk index number is 1 and the productive index is 4, this means the application i more productive).

Config)# show application-statistics by-application time-frame 86000Applications Count = 24Application Statistics for All Applications
Protocol or ApplicationProductivity Index & RiskTX PacketsTX BytesRX PacketsRX Bytes
Ad Analytics4142203231
Amazon217531437698337
Bonjour41171956151810
Doubleclick1184301906512228
Google Ads31103471367812223
Google Analytics41133750151711
Google APIs3147136288091892153251
Google312544324891556848664
Google Play3139340537422120638
Mozilla311176744610412051
NetBIOS NS130012936
NTP1332283228
OCSP31636404715247
OpenX11328374273507
Quantcast11144733172341
Rapleaf31196745192288
Reddit311262148239079582476
Scorecard Research11265876272748
SSDP41585259542367200
SSL3322613643517622509
TCP31300617097042311467655
Twitter347953301687532
Wikipedia33193126283873
YouTube141283803313019369

ap(config)# show application-statistics by-application time-frame 86000

Applications Count = 6

Application Statistics for All Applications

Protocol or Productivity TX TX RX RX

Application Index & Risk Packets Bytes Packets Bytes

Bonjour 4 1 3599 704477 1067 332560

DHCP 4 1 76 25156 0 0

ICMP 3 4 43 2580 1 60

MDNS 3 1 4414 633504 86 21324

NetBIOS NS 1 3 4785 376002 0 0

UDP 3 1 38944 2648192 62 10664

ap(config)# 

DPI CLI configuration

Users can enable Application Control globally by using the below commands:

To enable DPI support:

ap(config)# filter global-filter
ap(config-global-filter)# application-control
ap(config-global-filter)#

To disable DPI support:

ap(config)# filter global-filter
ap(config-global-filter)# no application-control
ap(config-global-filter)#

Global application policy

Per application policy

(config)# filter global-filter
(config-global-filter)# filter precedence 1
(config-global-filter-precedence-1)# application-control

050plus : 050Plus
12306cn : 12306.cn
123movie : 123movies
126com : 126.com
17173 : 17173.com
1fichier : 1fichier
2345com : 2345.com
247inc : [24]7 Inc.
247media : 24/7 Media
2channel : 2channel
33across : 33Across
360antiv : 360 AntiVirus
39net : 39.net
3comtsmx : 3COM-TSMUX
3pc : 3PC
4399com : 4399.com
4chan : 4chan
4shared : 4Shared
51com : 51.com
56com : 56.com
58com : 58.com.cn
914cg : 914CG
9gag : 9GAG
about : about.com
abscbn : ABS-CBN
acas : ACA Services
accweath : accuweather.com

XV3-8-441BCC(config-global-filter-precedence-1)# application-control youtube

deny : Block this application
permit : Allow this Application
set-dscp : set dscp priority
set-qos : set qos priority

XV3-8-441BCC(config-global-filter-precedence-1)# ication-control youtube permit

permit : Allow this Application 

Set per category policy

ap(config-global-filter-precedence-1)# category-control 
collab : Collaboration
database : Database
filexfer : File-Transfer
games : Games
mail : Mail
message : Messaging
monitor : Network-Monitoring
network : Networking
other : Other
proxy : Proxy
remote : Remote-Access
social : Social-Networking
stream : Streaming-Media
vpn_tun : VPN-Tunneling
web_srvc : Web-Services
ap(config-global-filter-precedence-1)# category-control games permit
ap(config-global-filter-precedence-1)# 

SSID application policy

ap(config)# filter filter-list 1
ap(config-filter-list-1)# filter precedence 1
ap(config-list-1-filter-precedence-1)# application-control facebook deny
ap(config-list-1-filter-precedence-1)#
ap(config-list-1-filter-precedence-1)# wireless wlan 1
ap(config-wlan-1)# filter-list 1
ap(config-wlan-1)# 

CLI Configuration

!
filter global-filter
stateful
application-control
filter precedence 1
category-control games permit
exit

filter filter-list 1
filter precedence 1
application-control facebook deny
exit

!
lldp
lldp tx-interval 100
power policy sufficient
logging syslog 7
!
(config-filter-list-1)# 

Custom Applications X

Custom applications allow you to configure applications with a specific IP address or a domain name apply filter rules, such as enable or disable traffic from these applications. By default, these applica applied on the devices along with the AP group configuration.

After creating the custom application, when you click Apply, cnMaestro creates a job for devices in the

AP group that has auto sync enabled. Devices in AP groups that do not have auto sync enabled, as Not in Sync, and users must manually apply the configuration on to the devices.

To disable cnMaestro from applying the custom application configuration on the devices, clear the Enable

Custom Application check box from the AP Groups > Services tab > Application Visibility X section.

To add a new custom application, complete the following steps:

  1. Navigate to Configuration > Wi-Fi Profiles > Custom Applications X.

Configuration > Wi-Fi Profiles AP Groups WLANs Association ACL Access Control Policies Custom Applications X Configure Custom Applications corresponding to an FQDN or IP Address to capture statistics or control web access. Applications are pushed to the devices along with AP Groups by default. After cleaning them, click the Apply button to create Auto Sync Jobs for devices under AP Groups with Auto Sync enabled. Devices under AP Groups without Auto Sync enabled will be marked as Not in Sync, and configuration needs to be pushed manually. Disable the tag "Enable Custom Application" from AP Group. > Services Tats to stop applying them. Apply Filter(s) Managed Account AI Accounts ▼ Add New Import Delete Export Application Name Managed Account Enabled Category Productivity Index Risk Index FQDN/IP Address test Base infrastructure Disabled Remote Access Medium High 5.6.78 nhtjdsqckjckj Base infrastructure Enabled Streaming Media Medium High 3.3.23 test_test Base infrastructure Enabled Custom Low Low 1.1.1 Showing: 3 Text: 10 < > < > < > < > < > < > < > < > < > < > < > < > < > < > < > < > < > < > < > < > < > < > < > < > < > < > Showing: 3 Text: 10 < > < > < > < > < > < > < > < > < > < > < >

  1. Click Add New on the Custom Applications X page.

The Add Custom Application(s) window is displayed.

Add Custom Application(s) This interface allows to add multiple custom applications, which will be saved and pushed to the device. Name* Scope Category* Base Infrastructure Custom FQDN/IP Address* Productivity Index* Low Risk Index* Low Add No Data Cancel Save and Apply

Configure the following parameters:

Table 50 Custom Application Parameters

Parameter Description
Name Specifiesthe name for the custom application.Supports a maximum of 20 characters.
Scope Specifiesthe availability of the custom application across managed accounts.The following values are supported:Base Infrastructure—Custom application is available only for the global account. It is not shared with other managed accounts.Shared—Custom application is shared across all managed accounts. It can be mapped to devices in the managed account, but it cannot be modified.To modify the configuration, it must be copied into the managed account and then updated.Managed Account—Custom application is available only for that specific managed account.Cambium Networks XE5-8 - Custom Applications X - 3NoteOnce the scope has been configured on a custom application, it cannot be modified.
Category Specifiesthe category to which the application must belong.Select the appropriate category from the drop-down list.
FQDN/IP AddressSpecifies the IPv4 address or the domain name of the custom application.
Productivity IndexIndicates how appropriate an application is useful for business purposes. The higher the rating number, the more business-oriented an application is.

Table 50 Custom Application Parameters

Parameter Description
Risk Index Indicates how likely an application is to pose a threat to the security of your network. The higher the rating number, the riskier of an application is.
Enable Select the check box to enable this custom application.
  1. Click Add.
  2. To apply this configuration on the AP, click Save and Apply.

Cambium Networks XE5-8 - Custom Applications X - 4

Note

WIDS and WIPS are beta features.

This section describes the following topics:

• Wireless Intrusion Detection Systems (WIDS)
- Wireless flood detection
- Neighbor AP detection
Rogue APs
Honeypot APs
- Ad Hoc network detection
- Wired Devices
Configuring WIDS
• Wireless Intrusion Prevention System (WIPS)

Wireless Intrusion Detection Systems (WIDS)

Wireless Intrusion Detection Systems (WIDS) is a powerful feature within cnMaestro that helps adminis monitor and protect their wireless networks from unauthorized access and potential security threats. Works by continuously scanning the wireless spectrum to detect and mitigate potential intrusions, ensure the integrity and security of your network infrastructure.

Wireless flood detection

Wireless flood detection helps in identifying and mitigating flood attacks in wireless networks. A flood occurs when a rogue client sends a large number of packets of a specific type to the AP to a normal working of the AP. This feature can detect the following types of flood attacks:

  • Association
  • Authentication
  • Disassociation
  • Deauthentication
  • Extensible Authentication Protocol over LAN (EAPoL)

CLI configuration:

ap(config)# wids
association-flood : Detect floods of client associations from clients
authentication-flood : Detect floods of client authentication from clients
deauthentication-flood : Detect floods of clients deauthentications from clients
disassociation-flood : Detect floods of client disassociations from clients
eap-flood : Detect floods of EAP messages from clients
num-of-minutes : Configure time duration for flood detection
num-of-packets : Configure threshold of flood packets 

Neighbor AP detection

The AP can detect all neighbor APs. By default, all neighbors in the home channel are detected. neighbors in all channels, go to Radio > Basic > Off Channel Scan and select the Enable check box.

Cambium Networks XE5-8 - Neighbor AP detection - 1

Note

Off Channel Scan is not required for XV3-8 platforms because they have inbuilt radio from monitoring.

Rogue APs

Rogue APs are unauthorized APs that are not onboarded to cnMaestro, which may include Cambium Cambium devices causing interference. The authorized or onboarded APs scan all available channels collect details about neighboring APs. They send this information to cnMaestro for monitoring and management.

CLI configuration:

To enable rogue AP detection:

ap(config)# wids
rogue-ap-detection : Enable unsanctioned AP detection 

Honeypot APs

Honeypot APs are unauthorized APs that advertise the same SSID as managed or onboarded APs. Detecting and monitoring these APs is crucial to prevent threats to the network infrastructure.

Ad Hoc network detection

A wireless Ad Hoc network is a type of Local Area Network (LAN) that is built spontaneously to more wireless devices to be connected to each other without requiring typical network infrastructure equipment, such as a wireless router or AP.

CLI configuration:

To enable ad hoc network detection:

ap(config)# wids
ad-hoc-detection : Detect ad-hoc networks 

To display ad hoc networks:

ap(config)# show wids adhoc-networks

Wired Devices

The Wired Devices section within cnMaestro provides administrators with insights into the wired device connected to the network infrastructure. This feature allows administrators to monitor and manage wir devices effectively to ensure optimal network performance and security.

CLI configuration:

To enable wired devices discovery:

ap(config)# wids
wired-neighbour-discovery : Enable wired neighbour discovery 

Configuring WIDS

To enable WIDS feature perform the following steps on the cnMaestro UI:

  1. Navigate to Configuration > Wi-Fi Profiles > AP Groups tab.
  2. Select the AP Group and navigate to the Security page.
  3. Select the Enable Wireless Intrusion Detection System (WIDS) checkbox.

Figure 63 Configuring WIDS
AP Groups > Add New Basic Management Radio Network Security DoS Protection IP Spoof Enable IP spoof attack protection (checks whether spoofed IP address is reachable before accept) Smurf Attack Enable SMURF attack protection (do not respond to broadcast ICMP) IP Spoof Log Enable IP spoof log messages (log unROUTable source addresses) ICMP Fragment Enable fragmented ping attack protection (drop fragmented ICMP packets) Access Control Services User-Defined Overncies WIDS x Enable Wireless Intrusion Detection System (WIDS) Wireless Flood Detection Packets Per Minutes 500 2 Default is 500 pockets per 2 minutes Association Detect floods of client associations from clients Authentication Detect floods of client authentication from clients Deauthentication Detect floods of client deauthentications from clients Dissociation Detect floods of client disassociations from clients EAP Detect floods of EAP messages from clients Save Close

  1. In the Wireless Flood Detection section, configure the number of packets and duration from the Packets and Per Minutes drop-down lists.

This indicates the number of flood attack packets that cnMaestro must detect in the specified to identify and report the type of attack.

  1. Select the type of flood attack detection types that you want to configure in the Wireless Flood Detection section.

Table 51 Wireless Flood Detection parameters

Field Description
Association Detect floods of client associations from clients.
Authentication Detect floods of client authentication from clients.
Deauthentication Detect floods of client deauthentications from clients.
Disassociation Detect floods of client disassociations from clients.
EAP Detect floods of EAP messages from clients.

Wireless Intrusion Prevention System (WIPS)

WIPS is a critical feature within cnMaestro designed to enhance the security of wireless networks. ' enabled, WIPS triggers Wi-Fi devices to deauthenticate rogue APs and clients by sending spoofed

deauthentication messages to the rogue APs and clients. You can also trigger Wi-Fi devices to deauthenticate honeypot APs and clients by enabling this feature.

CLI configuration:

To configure AP to detect honeypot and rogue APs, and send deauth requests to respective connect clients:

ap(config)# wips
deauth-honeypot-clients : Detect honeypot APs and send deauth to respective clients
deauth-rogue-ap-clients : Detect rogue APs and send deauth to respective clients 

Configuring Services

This chapter describes the following topics:

Overview
- Configuring services

Overview

This chapter gives an overview of Enterprise Wi-Fi AP configurable parameters related to User Group Location API, Speed Test, BT Location API, Bonjour Gateway, LACP, and RTLS.

Configuring services

This section provides information on how to configure the following services on Enterprise Wi-Fi AP.

To configure the services for the AP, complete the following steps:

  1. Navigate to Configuration > Wi-Fi Profiles > AP Groups page.
  2. Click Add New and select Enterprise Wi-Fi (E-Series, XE/XV/X7-Series) from the Type drop-down list.
  3. Click Services tab and configure the following services:

• Lightweight Directory Access Protocol (LDAP)

- NAT Logging

- User Groups

- Wi-Fi API

- Bluetooth API

- Speed Test

- DHCP Option 82

- Bonjour Gateway

- Link Aggregation Control Protocol (LACP)

• Real-Time Location System (RTLS)

Lightweight Directory Access Protocol (LDAP)

The following table lists the fields that are displayed in the AP Groups > Services > Network > LDAP page.

Table 52 LDAP parameters

ParametersDescription Range Default
Server HostIP address or hostname of the LDAP server.AP server.- -
Server PortPort number of the LDAP server.--

Figure 64 LDAP parameters
Network LDAP Server Host LDAP server IP address Server port LDAP server port

NAT Logging

NAT logging is same as the internet access log that is generated when NAT is enabled on AP. access log PDU consists of one or more internet access log data in TLV format. The packet for internet access log PDU is defined as below:

Table 53 PDU type code: 0x82

TypeMandatory LengthDefault Value
0x01 N 32 BytesIncludesIPv4 internet access log data structure.

Type 0x01 TLV includes the internet access log data structure as below:

Table 54 NAT Logging packet structure

LengthDescription
4 BytesNAT records UNIX time stamp which generates time in seconds from 1970-01-01 (00:00:0 GMT until now).
6 BytesThe MAC address of the client.
1 BytesReserved for future use.
1 BytesThe protocol type. The supported protocol types are:0x06 TCP0x11 UDP
2 BytesThe VLAN ID where the client is connected. If there is no VLAN ID, the value will be
4 BytesThe client internal or the private IP address.
2 BytesThe internal port of the client.
LengthDescription
4 BytesThe Internet IP address which is translated by NAT.
2 BytesThe Internet port which is translated by NAT.
4 BytesThe IP address of the visited server.
2 BytesThe port address of the visited server.

Below table lists the fields that are displayed in AP Groups > Services > Network > NAT Logging page.

Table 55 NAT Logging parameters

ParametersDescription Range Default
Enable Provision to enable/disable NAT logging services. - -
Server IP Provision to configure IP/Hostname of NAT logging server.- -
Server Port Provision to configure custom port number for NAT Logging services.-
Interval Provision to configure frequency of logging.5-36005

Figure 65 NAT Logging parameters
Network LDAP NAT Logging Enable Server IP NAT Logging server IP address Server Port NAT Logging server port address Interval 5 NAT logging interval (5-3500 seconds)

User Groups Premium feature

Some policies, like VLAN, require many RADIUS attributes to be sent by the RADIUS server and by the AP. Some wireless network administrators do not have administrative access to the RADIUS so making changes to wireless policies would require waiting for the RADIUS administrator to make changes.

To simplify wireless administration and streamline changes, a feature called User Groups is provided allows the wireless administrator to apply a set of wireless policies to a user based on a single attribute. This eliminates the need for administrative rights on the RADIUS server and simplifies applying complex policies to end-user stations.

A user group can also be assigned to a station based on the device type. This approach is de accuracy and completeness of device identification functionality, which is not guaranteed to be accurate exhaustive.

The User Group feature is natively supported by XMS Cloud.

Figure 66 User Groups interaction
User Groups Interaction
Cambium Networks XE5-8 - User Groups Premium feature - 1

flowchart
graph TD
    A["Client Station"] -->|associate and authenticate| B["AP"]
    B -->|validate credentials| C["RADIUS Server"]
    C -->|send Access-Accept with user group attribute| B
    B -->|Allow access and apply policies| D["Look up user group by radius-id"]

CLI Configuration:

ap(config)# group
Specify user group number <1-16>
ap(config)# group 1
ap(config-group-1)#
clear : Clear command
filter-list : Filter list selection for this user group
radius-id : Radius Filter-ID (Attribute Type 11) mapped to this user group
shutdown : Disable the user group
vlan : Set the vlan id for client traffic on this user group
apply : Apply configuration that has just been set
exit : Exit from user group configuration
no : Disable user group parameters
save : Save configuration to Flash so it persists across reboots
show : Show command
ap(config-group-1)# 

Example:

! group 1 radius-id student vlan 40 filter-list 1 ! group 2 radius-id teacher vlan 30 filter-list 2

User group properties and actions

A user group supports the following properties and actions:

Command Description
shutdown Disable this User Group
radius-id Radius Filter-ID (Attribute Type 11) mapped to this User Group
no shutdown Enable this User Group
no groupDelete User Group

User group policies

The policies available in a user group configuration are a subset of those for an SSID. The most used policies are filter-list and VLAN.

Policy Description
filter-listFilter Listsetting for this User Group
vlan VLAN associated withthis User Group

Real-Time Location System (RTLS)

RTLS is a method to send the discovered (probed) clients list to a specified server address. The sent as HTTP Post to the HTTP server every interval. The discovered client entries are deleted from the entry is aged out. The client aging timeout is 2 times of location API interval configured. If new probe requests from the client within 2 x location API interval time, then the client entry will from the list.

The following RTLS systems are available:

  • Wi-Fi API
  • Bluetooth API

Wi-Fi API

Below table lists the fields that are displayed in the AP Groups > Services Network > RTLS (Real-Time Location System) > Wi-Fi API page.

Table 56 Wi-Fi API parameters

Parameters Description Range Default
Enable Provisionto enable or disable Wi-Fi API services. - -
Server URL Provisionto configure HTTP or HTTPS server to send with the port number.a- report-
Interval Provisionto configure the custom frequency of information to be shared on server.2-36005
Ignore Anonymized MACsAvoid populating locally administrated MAC addresses Wi-Fi API client list.- in the-

Figure 67 Wi-Fi API parameters
RTLS (Real-Time Location System) Wi-Fi API Enable Ignore Anonymized MACs Server URL https://Server IP Address/Port/Hostname/ Interval 5 Configure Location API interval (2-3600 seconds)

Cambium Networks XE5-8 - Wi-Fi API - 2

Note

For further details about this feature and sample reference output, go to https://support.cambiumnetworks.com/files/cnpilot-tech-ref/ and download Wireless client Presence and Locationing API document.

Bluetooth API

XV3-8/XV2-2T APs with an integrated Bluetooth Low Energy (BLE) radio can detect and locate near devices. This data is then provided via API to third-party applications. Examples of such devices include smartwatches, battery-based beacons, Apple iBeacons, fitness monitors, and remote sensors.

Organizations can create use cases for indoor wayfinding and mapping, asset tracking, and more.

Below table lists the fields that are displayed in the AP Groups > Services Network > RTLS (Real-Time Location System) > Bluetooth API page..

Figure 68 Bluetooth API
RTLS (Real-Time Location System) + Wi-Fi API - Bluetooth API □ Enable Server URL Port https://Server IP Address/Hostname> 443 Interval 10 Configure Bluetooth API interval (10-3600 seconds)

Table 57 Bluetooth API parameters

Parameters Description Range Default
Enable Enable or disable Bluetooth API services. - -
Server URL and PortConfigure HTTP or HTTPS server and the port number, to a report.per, tosend
Interval Configurethe custom frequency of information to be shared server.286005

Sending report

After enabling BLE Scanning on AP it will start processing:

  1. Convert the scanned data to a JSON array.
  2. Send that data in one single HTTP/HTTPS POST.

To configure the BT Location-API in the CLI:

ap(config)# location-api
ignore-anonymized-mac : Ignore MAC addresses that are anonymized
interval : Configure reporting interval in secs
server : HTTP/HTTPS server to send report to with the port number 

To disable the BT Location-API:

ap(config)# no location-bt-api 

Bluetooth API data elements

Table 58 Bluetooth API data elements

Parameters Description
apMac MAC address of theobserving AP.
API Version API Version applied for particular data format.
AP Name Host name of the observing AP.
Timestamp Observation timein seconds seen by AP.
BT MAC BLE device MACseen by AP.
UUID BLE device UUID seen by AP.
RSSI BLE device RSSI as seen by AP.

HTTP POST body format:

{
    u'ap_mac': '00-04-56-A5-5A-EC',
    'version': '2.2',
    'ap_name': 'X7-35X-B0007C',
    'ap_name': 'XV3-8-EC7708',
    'ble_discoverd_clients': {Array of 0-250 devices}
}

Bluetooth API Data Format
{
    bt_rssi': u' -80 dBm ', 
    bt_mac': 14-8F-21-FD-37-18', u 
    'bt_uuids': Garmin International, Inc. (0xfelf)\n',
    'bt_timestamp': u' 1.811127'
} 

Stanley AeroScout Premium feature

The Location Engine delivers accurate and reliable location data for assets and customers with STAN Healthcare Wi-Fi tags. It is an integral component of STANLEY Healthcare's AeroScout RTLS solutions AeroScout Location Engine determines location using signal strength measurements (RSSI) collected by Cambium Wi-Fi Access Points, that can simultaneously serve location sensors and provide network ac AeroScout utilizes a location engine to determine the position of Wi-Fi tags.

CLI Configuration:

ap(config)# rtls aeroscout
ble-tag : Enable Aeroscout BLE Tag
server : Configure Aeroscout Server IP or FQDN
server-port : Configure Aeroscout Server Port (Default port:12092) 

wifi-tag : Enable Aeroscout WiFi Tag

Below table lists the fields that are displayed in the AP Groups > Services Network > RTLS (Real-Time Location System) > Stanley AeroScout page..

Figure 69 Stanley AeroScout
RTLS (Real-Time Location System) + Wi-Fi API + Bluetooth API - Stanley - AeroScout x Enable Wi-Fi ? Enable Bluetooth Host Port Enter a valid 12092

Table 59 Stanley AeroScout parameters

Parameters Description Range Default
Enable Wi-Fi Enable or disable Wi-Fi or Bluetooth Stanley Aero services. Enable BluetoothEnable or disable Wi-Fi or Bluetooth Stanley Aero services.Seout-
Server URL and PortConfigure HTTP or HTTPS server and the port number send a report.Port: 12092

Speed Test

Wi-Fiperf is a speed test service available on Enterprise Wi-Fi AP devices. This tool is interoperable open source zapwireless tool (https://code.google.com/archive/p/zapwireless/).

The Wi-Fiperf speed test can be triggered by using zapwireless tool between two Enterprise Wi-Fi between Enterprise Wi-Fi APs and other third-party devices (or PC) that is having zapwireless endpo running.

Refer to https://code.google.com/archive/p/zapwireless/ to download the zap wireless tool to generate zapwireless endpoint for third party device (or PC) and zap CLI to perform the test.

In this case, Wi-Fiperf endpoint should be enabled in Enterprise Wi-Fi AP through UI shown below.

To configure the above parameter, navigate to the AP Groups > Services > Network > Speed Test page.

Select the Wi-Fiperf checkbox to enable the speed test.

Figure 70 Speed Test parameters
Cambium Networks XE5-8 - Speed Test - 1

Speed Test

□ Wi-Fiperf Enable Wi-Fiperf Endpoint

DHCP Option-82

DHCP Option 82 parameter enabled at the device level with VLAN IDs inserts the Option 82 paran all the DHCP client packets leaving the configured VLAN interfaces. This device-level configuration precedes the DHCP Option 82 configuration at the WLAN profile or the L3 interface levels.

In case DHCP Option 82 is configured at the device-, WLAN profile-, and L3 interface-levels, the fo priority order is considered:

  1. Device-level configuration
  2. WLAN profile-level configuration
  3. L3 interface-level configuration

The device-level configuration is recommended when it is desired to insert the DHCP Option 82 for following options:

  • Guest access enabled wired traffic

- Guest and without guest access enabled wireless DHCP client traffic

To configure the above parameter, navigate to the AP Groups > Services > Network page and provide the details in the DHCP Option 82 section:

  1. Select the Enable checkbox.

  2. Select the circuit ID from the Option 82 Circuit ID drop-down list.

Following are the supported values:

  • None
    • All
  • Hostname
  • APMAC
  • SSID
    • VLANID
  • SITEID
  • Custom

  • Select the remote ID from the Option 82 Remote ID drop-down list.

Following are the supported values:

  • None
  • Hostname
  • APMAC
  • SSID
    • VLANID
  • SITEID
  • Custom

  • Enter the VLAN ID in the VLAN ID text box.

  • Click Save.

Figure 71 DHCP Option 82 parameter
DHCP Option 82 ✓ Insert DHCP Option 82 for all wireless and guest enabled wired clients. Option 82 Circuit ID None ✓ Insert DHCP Option 82 circuitID information Option 82 Remote ID None ✓ Insert DHCP Option 82 remoteID information VLAN ID Configure VLAN to have DHCP Option 82 (1-4094)

Bonjour Gateway

Bonjour enables the automatic discovery of devices such as printers, file servers, and other clients. Services on a local network. Bonjour Gateway feature on Wi-Fi AP extends the scope of Bonjour: beyond the local network by forwarding Bonjour Multicast DNS (mDNS) packet across different VLANs make Bonjour services and devices available between the different wireless and local networks.

Below table lists the fields that are displayed in the AP Groups > Services > Bonjour page.

Parameters DescriptionRange Default
Enable Bonjour GatewayProvision to enable or disable Bonjour Gateway services.-
Service Name Provision for user-defined Bonjour rule name. --
Proto Select the required mDNS protocol. - -
From VLAN VLANin which mDNS/Bonjour service is running.- -
To VLAN VLAN inwhich clients are listening. - -

CLI Configuration:

  1. Enable Bonjour Gateway on AP.
  1. To control mDNS repeated packet to WAN side.
ap(config)# bonjour-fw bonjour-forward-to-wan
all : Forward all bonjour mdns packets queries and response repeated with vlan to WAN side
queries : Forward bonjour mdns Query packets repeated with vlan to WAN side
responses : Forward bonjour mdns Response packets repeated with vlan to WAN side 

Note

  1. By default, mDNS repeated will not send to the WAN side.

  2. WAN side indicates Eth 1 interface, Mesh client interface in case of mesh client mc tunnel interfaces like L2GRE, and L2TP.

LACP provides the ability to group multiple physical ports as a logical port. This logical port is re port-channel and supported only on XV3-8 devices. LACP is a dynamic protocol used to form and the Link aggregation between two LACP supported devices.

LACP provides the following benefits:

  • Increased Bandwidth: traffic may be balanced across the member ports to provide increased agg throughput.
  • Link redundancy: the LACP bundle can survive the loss of one or more member links.

Configuration:

To add Ethernet to port channels:

ap(config)# interface portchannel 1
ap(config-portchannel-1)# exit
ap(config)# interface eth 1
ap(config-eth-1)# channel-group 1
ap(config-eth-1)# exit
ap(config)# interface eth 2
ap(config-eth-2)# channel-group 1
ap(config-eth-2)# 

Port-channel configuration:

ap(config)# interface portchannel 1
ap(config-portchannel-1)#
advertise : Ethernet link speed advertisement
channel-group : Ethernet member channel group
clear : Clear command
duplex : Ethernet link duplex
shutdown : Shutdown interface
speed : Ethernet link speed
switchport : Configure switch port
tunnel-mode : Enable tunnelling of wired traffic over configured tunnel
apply : Apply configuration that has just been set
exit : Exit from interface configuration
no : Disable parameters
save : Save configuration to Flash so it persists across reboots
show : Show command 

Syntax:

ap(config)# interface portchannel 1
ap(config-portchannel-1)# switchport mode trunk
ap(config-portchannel-1)# switchport trunk allowed vlan 1
ap(config-portchannel-1)# switchport trunk native vlan 1
ap(config-portchannel-1)# 

Operations

This chapter describes the following topics:

• Overview
- Firmware upgrade

Overview

This chapter gives an overview of Enterprise Wi-Fi AP administrative functionalities, such as firmware update, System, and Configuration.

Firmware upgrade

The running software on the Cambium Enterprise Wi-Fi AP can be upgraded to newer firmware. Wi upgrading from the UI, the user can upload the firmware file from the browser. The same process followed to downgrade the AP to a previous firmware version if required. Configuration is maintained the firmware upgrade process.

Cambium Networks XE5-8 - Firmware upgrade - 1

Note

Once a firmware upgrade has been initiated, you must not restart the AP or power cycle until the process completes, as this might leave the AP inoperable.

To initiate a firmware update on the AP, complete the following steps:

  1. Navigate to Monitor and Manage > System > Software Update.
  2. Select Enterprise Wi-Fi (XE/XV/X7-Series) from the Device Type drop-down list.
  3. Select the appropriate firmware version from the Versions drop-down list.
  4. From the list of devices, select the devices for which you want to update the firmware.
  5. Select the time when you want to perform the update from the Update section.
  6. Select the appropriate options from the Job Options section.
  7. If you select multiple devices, specify how many devices must be updated simultaneously in the box.

A maximum of 500 devices can be updated simultaneously.

  1. Click Add Software Job to devices.

Figure 74 Software update
System Dashboard Notifications Configuration Statistics Reports X Software Update Applications X Clients Mesh Peers Analytics X Assists X Device Type Enterprise Wi-Fi (XB/XV/X7 Sonus) Versions 70-15 (X7.35X Build) Search Managed Account All Accounts Devices Managed Account Status Client Count Active Inactive X7-35X-B000A0 Base Infrastructure Offline (27d 14h 18m) N/A 7.0-b12 7.0-a27 X7-35X-B000B2 Base Infrastructure Online (2d 3h 17m) 1 7.0-r5 7.0-r3 X7-35X-B000B8 Base Infrastructure Offline (27d 20h 13... N/A 7.0-b14 7.0-b14 X7-35X-B000D0 Base Infrastructure Offline (3d 14h 18m) N/A 7.0-r1 7.0-b18 X7-35X-B000D4 Base Infrastructure Offline (0d 10h 53m) N/A 7.0-r3 7.0-b16 X7-35X-B000E8 Base Infrastructure Online (3d 16h 21m) 0 7.0-a0 7.0-b15 X7-35X-B000EE Base Infrastructure Online (8d 3h 4m) 0 7.0-b18 7.0-b17 X7-35X-B000F0 MC Base Infrastructure Offline (2d 19h 33m) N/A 7.0-r3 7.0-r3 X7-35X-B001A4 Base Infrastructure Offline (2d 18h 44m) N/A 7.0-t1 7.1-a0 X7-35X-B001D6 Base Infrastructure Online (4d 14h 59m) 0 7.1-a0 7.1-a0 Showing 1 : 10 Total: 28 10 Previsions 1 2 3 Next > Update Now Schedule Job Options Stop update on critical error Retry skipped/offline device(s) on reconnect Update both partitions Perform sequential updates within a site Perform batch updates followed by reboot 10 Devices to update in parallel (I-500) Notes Add Software Job to O device(s) View Update Jobs

LED Test flashing pattern

The LED test flashing pattern for the Enterprise Wi-Fi AP is as follows:

Flashing pattern (For X7-35X, XV3-8, XV2-2, XV2-2T0, XV2-2T1, XE5-8, and XE3-4): Yellow -> Green -> Amber -> Blue

Flashing pattern (For XV2-21X, XV2-23T, and XV2-22H): Green -> Amber -> Blue

CLI commands:

ap(config)# service flash-leds
Number of seconds to flash <1-120> (optional: default 10sec)
ap(config)# service test leds 

Troubleshoot

This chapter provides detailed information about troubleshooting methods supported by Enterprise Wi-Fi APs. Troubleshooting methods supported by Enterprise Wi-Fi AP devices are categorized as below:

  • Status
  • Logging
    Debug Logs
    • Radio Frequency (RF)
    Wi-Fi Analyzer
  • Packet capture
  • Performance
    Network Connectivity
  • Remote CLI
  • Flash LEDs
    • XIRCON tool support

- Downloading tech support file

- XIRCON tool support for Linux 1.0.0.40

Status

The Status page displays the status of link between the Enterprise Wi-Fi AP and clients. It also displays mesh connections present. You can download the tech support file for further troubleshooting from a page.

To view the status of the link between the Enterprise Wi-Fi AP and clients, access the Status page under Monitor and Manage > > Tools.

Figure 75 Status page
Wi-Fi > AP2-X7-35X-B012EA-UNIT-101 Dashboard Notifications Configuration Details Performance Software Update Tools Clients Mesh Peors WLANs Assists X Status Debug Remote CLI Packet Capture Network Connectivity Wi-Fi Analyzer Flash LEDs X7-35X AP2-X7-35X... Wireless 2 Associated Clients

Downloading tech support file

To download the tech support file, click the Download Tech Support File ( ) icon on the Status page.

Figure 76 Downloading tech support file
Wi-Fi > AP2-X7-35X-B012EA-UNIT-101 Dashboard Notifications Configuration Details Performance Software L Status Debug Remote CLI Packet Capture Network Connectivity X7-35X AP2-X7-35X-B012EA-UNIT... Online Download Tech Support File Wireless Associated Clients

Logging

Enterprise Wi-Fi AP devices support multi-level logging, which will ease debug issues.

Debug Logs

Enterprise Wi-Fi AP provisions enhanced debugging of each module as events generated by system scope of debugging is limited. Debug logs are triggered when the user clicks Start Logs and terminates when user clicks Stop Logs. By default, debug logs auto terminate after 1 minute after initiating.

The Debug page displays log information of the Enterprise Wi-Fi AP. To view the debug information complete the following steps:

  1. Navigate to the Monitor and Manage > > Tools > Debug tab.

  2. Click Start Logs.

The log information is displayed in the Output window.

Figure 77 Debug page
Wi-Fi > AP2-X7-35X-B012EA-UNIT-101 Dashboard Notifications Configuration Details Performance Software Update Tools Clients Mesh Peers WLANs Assists Status Debug Remote CLI Pocket Capture Network Connectivity Wi-Fi Analyzer Flash LEDs Start Logs Output

Radio Frequency (RF)

Wi-Fi Analyzer

Wi-Fi Analyzer enables customers to scan the supported channels as per regulatory domain and pro information related to AP's presence in each channel. Wi-Fi analyzer graphs are available in two m

- Interference

This tool shares more information about each channel as below:

Noise
- Interference measured in RSSI
- List of neighbor APs

• Number of APs

This tool shares more information about each channel as below:

  • Noise
    • Number of neighbor APs
    • List of neighbor APs

To view the channel information, complete the following steps:

  1. Navigate to the Monitor and Manage > > Tools > Wi-Fi Analyzer tab.
  2. Select the radio band for which you want to view the information.
    The following options are supported:

• 2.4 GHz
- 5 GHz

• 6 GHz (displayed only for supported APs)

3. Click Start Scan.

The channel information is displayed as follows:

• Interference display mode

Figure 78 Interference display mode
Cambium Networks XE5-8 - Click Start Scan. - 1

line | Channel | Interference | Noise | |---------|--------------|-------| | 26 | -20 | -60 | | 42 | -18 | -60 | | 44 | -25 | -60 | | 52 | -60 | -60 | | 60 | -40 | -60 | | 80 | -55 | -60 | | 104 | -20 | -60 | | 115 | -55 | -60 | | 128 | -30 | -60 | | 161 | -50 | -60 | | 196 | -10 | -60 |

• Number of APs display mode

Figure 79 Number of APs display mode
Cambium Networks XE5-8 - Click Start Scan. - 2

Packet capture

Allows the administrator to capture packets from the APs UI, cnMaestro UI, or XMS-Cloud. The adn can filter the packets being captured by specifying a particular MAC address, IP address, and port. The user can trigger packet capture on one or more interfaces, simultaneously view the progress of capture. The user can also download the captured pcap file on completion.

Enterprise Wi-Fi AP device allows packet capture on the following interfaces:

  • Ethernet
  • Radio
  • Wireless LAN
  • VLAN
  • SSID
  • Tunnel

- Bridge

- PPPoE

Cambium Networks XE5-8 - Packet capture - 1

Note

When AP packet capture is configured for the radio or wireless LAN interface, the AP records data only from the nearby APs. It does not capture its own transmissions like beacon frames or SSID broadcasts.

Multiple options of filtering are provided and are available at Troubleshoot > Packet Capture page.

To generate and view the packet information, complete the following steps:

  1. Navigate to the Monitor and Manage > > Tools > Packet Capture tab.

Figure 80 Packet Capture page
Wi-Fi > AP2-X7-35X-B012EA-UNIT-101 Dashboard Notifications Configuration Details Performance Software Update Tools Clients Mesh Peers WLANs Assists X Status Debug Remote CLI Packet Capture Network Connectivity Wi-Fi Analyzer Flash LEDs New Packet Capture Start Delete Interface Packets Duration Size Filter Start Time Expires In Status No Data Available Showing 0 0 Total: 0 10 Previous Next

  1. Click New Packet Capture.

The New Packet Capture window is displayed.

Figure 81 New Packet Capture window
New Packet Capture Interface Ethernet Internet Ent Filter Options Filter Builder Custom Filter Group Condition - OR Default Options Packets 0 0 to 655/35 (default 0 indicates unlimited) Duration 120 1 to 500 (default 120) seconds Packet Length 0 0 to 1500 (default 0 indicates full packet length) File Size 10 1 to 50 (default is 10 MB on free APs) Cancel Start Later Start Now

  1. Configure the required interface and the corresponding parameters, and the filter options.

  2. Click Start Now or Start Later depending on whether you want to start packet capture now or at a later time.

When you select Start Later, you must click the start ( ) icon to start the packet capture.

  1. After the capture starts, the Status column displays Running.

Click the stop ( ) icon to stop the capture.

  1. To download the packet capture file, click the download ( ) icon.

  2. To replicate an existing packet capture with different filter options, click the clone ( ) icon corresponding to the packet capture. Specify the filter options and click Clone.

Figure 82 Clone packet capture
Clone Eth1 Filter Options ● Filter Builder ○ Custom Filter Group: Condition = OR ● Default Options Cancel Clone

Performance

Network Connectivity

This tool helps to check the accessibility of remote hosts from Enterprise Wi-Fi AP devices. The tools are supported:

  • Ping / Ping6
    • DNS Lookup / DNS Lookup6
  • Traceroute

To test network connectivity of the router, complete the following steps:

  1. Navigate to the Monitor and Manage > > Tools > Network Connectivity tab.
  2. Select the required test type from the Test Type dropdown list and configure the corresponding parameters required for the test as described in the following table:

Table 61 Troubleshoot: Connectivity

Parameters Description Range Default
Ping / Ping6
IP Address or HostnameIPv4 address or hostname to validate the reachability of destined Host.bility ofthe
Number of PacketsNumber of request packets that are required to transmitted to validate the reachability of the destined Host.10 3
Buffer Size ICMP packet size to be transmitted. 1-65507 56
Ping Result Displays the ICMP results. - -
DNS Lookup / DNS Lookup6
Host Name Hostname whose IP must be resolved. - -
DNS Test Result Displays the IPs that are associated with configured hostname.-
Traceroute
IP Address or HostnameIPv4 address or hostname to validate the reachability of destined Host.bility ofthe
Fragmentation Indicates whether to allow or deny fragment packets. - Off
Trace MethodPayload mechanism to check the reachability of desired IPv4 address of hostname.- de cmpredEcho
Display TTLProvision to customize TTL display.-On
VerboseProvision to display the output of traceroute.- On
Traceroute ResultDisplays the output of the traceroute command.- -

3. Click Start .

cnMaestro initiates the test and displays the result in the Result window.

Wi-Fi > AP2-X7-35X-B012EA-UNIT-101 Dashboard Notifications Configuration Details Performance Software Update Tools Clients Mesh Peers WLANs Assists X Status Debug Remote CLI Packet Capture Network Connectivity Wi-Fi Analyzer Flash LEDs Test Type Ping Network ping to a hostname or IP address. IP Address or Hostname: www.cambiumnetworks.com Number of Packets (-c) 3 Min = 1, Max = 10 Buffer Size (-s) 56 Min = 1, Max = 65507 Start Ping Ping Result Complete Hostname www.cambiumnetworks.com PING www.cambiumnetworks.com (141.193.213.1t): 56 data bytes 64 bytes from 141.193.213.1t: seq=0 til=54 time=23.479 ms 64 bytes from 141.193.213.1t: seq=1 til=54 time=23.958 ms 64 bytes from 141.193.213.1t: seq=2 til=54 time=23.635 ms -- www.cambiumnetworks.com ping statistics -- 3 packets transmitted, 3 packets received, 0% packet loss round-trip min/avg/max = 23.479/23.690/23.958 ms

Remote CLI

This tool allows users to execute device CLI commands, such as service show and show through cnMaestro.

To execute CLI commands, complete the following steps:

  1. Navigate to the Monitor and Manage > > Tools > Remote CLI tab.
  2. Enter the command in the Command box.
  3. Click Run.

The command output is displayed in the Output window.

Figure 83 Remote CLI page
Wi-Fi > AP2-X7-35X-B012EA-UNIT-101 Dashboard Notifications Configuration Details Performance Software Update Tools Clients Mesh Peers WLANs Assists X Status Debug Remote CLI Packet Capture Network Connectivity Wi-Fi Analyzer Flash LEDs Command Type CLI command Run Output Complete Device > show wireless clients MAC VENDOR AGE(sec) MODE STREAM SLEEP RADIO LAN VLAN 882.11-AUTH NAME SSID Intel 50229 ac 1 n 2 1 151 y - 1* 3-4 Total number of clients: 1

  1. To download the output, click the download ( ) icon.

Flash LEDs

Flash LEDs indicate that a device is ready to receive the signal.

To flash the LEDs of an AP, access the Flash LEDs page under Monitor and Manage > > Tools and specify the duration (10-120 seconds) of flash.

Figure 84 Flash LEDs page
Wi-Fi > AP2-X7-35X-B012EA-UNIT-101 Dashboard Notifications Configuration Details Performance Software Update Tools Clients Mesh Peers WLANs Assists X Status Debug Remote CLI Packet Capture Network Connectivity Wi-Fi Analyzer Flash LEDs Duration 10 Flash LED (10-120) seconds Flash LEDs

XIRCON tool support

The Xirrus console (Xircon) is a necessary tool for daily management, troubleshooting, and testing. X customers and field engineers use them for initial configuration, troubleshooting individual AP problems changing IP addresses, and recovering units that would not boot. Since Cambium Networks acquired and we expect the XV series APs to be deployed along with legacy Xirrus APs, limited Xircon's added to the XV series APs.

The name "Xircon" refers to the feature in general, including the AP functionality, the communication protocol, and the client software used for discovering and controlling Xirrus APs.

  • Xircon detects APs by listening for Xircon beacon packets. These packets are sent via UDP to port and multicast address. These are the existing Multicast beacons sent by AOS.
  • Control is established over unicast UDP on a different port from discovery. Only one client dev control an AP at any given time.

  • Individual packets are RC4 encrypted. The payload includes a hash to ensure that any tamperin packet corruption is detected, and the packet discarded.

  • Starting with Release 6.2, Enterprise Wi-Fi APs can be detected by Xirrus AOS APs and the client. It is not possible to establish a Xircon console connection to XV series APs – for that IP address from Xircon and use standard SSH to connect.

XIRCON tool support for Linux 1.0.0.40

XIRCON tool support for Linux 1.0.0.40 has been added which is used to discover APs in the next IP address is not known.

Management Access

This chapter describes different methods of authenticating users to access device UI. Following are authentication methods supported by Enterprise Wi-Fi AP devices:

  • Local authentication
    • SSH Key authentication
    • RADIUS authentication

Local authentication

This is the default authentication mode enabled on the device. Only one username is supported w admin. The default password for the admin username is admin. The user has a provision to configure or update password.

Device configuration

The below figure shows how to configure or update the default password of the admin user.

  1. Navigate to AP Groups > Management section.
  2. Enter the administrator password in the Admin Password field.
  3. Click Save.

Figure 85 Configure/update default password of the admin user
AP Groups > Add New Basic Management Radio Network Security Access Control Administrator Access Admin Password Configure password for authentication of GUI and CLI sessions (max 32 characters) Telnet. Enable Telnet access to the device CLI SSH Enable SSH access to the device CLI SSH Key Note: Use SSH Key, Telnet of password for authentication

SSH Key authentication

SSH keys are also used to connect remote machines securely. They are based on the SSH crypto network protocol, which is responsible for the encryption of the information stream between two ma Ultimately, using SSH keys users can connect to remote devices without even entering a password much more securely too. SSH works based on “public-key cryptography”. For simplicity, let us consider SSH keys come in pairs. There is a private key, that is safely stored to the home machine of the a public key, which is stored to any remote machine (AP) the user wants to connect. So, whenever initiates an SSH connection with a remote machine, SSH first checks if the user has a private key matches any of the public keys in the remote machine and if not, it prompts the user for a pa

Device configuration

SSH Key-based access method can be configured on the device from cnMaestro. Navigate to AP Groups > Management section and complete the following steps.

  1. Select the SSH checkbox.

  2. Provide the public key generated from the steps described in the SSH Key generation section.

Figure 86 Management parameters
AP Groups > Add New Basic Management Radio Network Security Access Control Services Administrator Access Admin Password Configure password for authentication of GUI and CLI sessions (max 32 characters) Telnet Enable Telnet access to the device CLI SSH Enable SSH access to the device CLI SSH Key Show Use SSH keys instead of password for authentication HTTP Enable HTTP access to the device GUI

SSH Key generation

Windows

You may use a tool, such as PUTTY to generate both public and private keys. Below is a sample demonstration of configuring Enterprise Wi-Fi AP device and logging using SSH key via UI.

  1. Generate a key pair in PUTTY Key Generator as shown in .

Figure 87 Generating public/private Key
PuTTY Key Generator File Key Conversions Help Key Please generate some randomness by moving the mouse over the blank area. Actions Generate a public/private key pair Load an existing private key file Save the generated key Save public key Save private key Parameters Type of key to generate: ● RSA ○ DSA ○ ECDSA ○ ED25519 ○ SSH-1 (RSA) Number of bits in a generated key: 2048 PuTTY Key Generator File Key Conversions Help Key No key. Actions Generate a public/private key pair Load an existing private key file Save the generated key Save public key Save private key Parameters Type of key to generate: ● RSA ○ DSA ○ ECDSA ○ ED25519 ○ SSH-1 (RSA) Number of bits in a generated key: 2048

  1. Save the Public key and Private key once the key pair is generated as shown in .

Figure 88 Public and Private Key
PuTTY Key Generator File Key Conversions Help Key Public key for pasting into OpenSSH authorized_keys file: ssh=ssa AAAAB3NzaC1yc2EAAAAABJQAAAGEAhZym83TfwRgVG9VxhTypwFbvUZeL1D2caL oVsdA2J8d6AO9tCFs7uMldAyDZPFzL0CYZatv0rM+e96XRhSPxt8eC +qLG4C/N2P/G +VSfsKYYEYpVK4wuhz9dILRhVJ/m1TFnZrVADVlkVS30gUl222uQU5BOsSREsVAM Key fingerprint: ssh=ssa 2048 02:9e:02:ba13:9b:74:b1:5d:dc:93:c0:d2:d2:33:0b Key comment: rsa-key-20170405 Key passphrase: Cgrfim passphrase: Actions Generate a public/private key pair Generate Load an existing private key file Load Save the generated key Save public key Save private key Parameters Type of key to generate: ● RSA ○DSA ○ ECDSA ○ED25519 ○SSH-1 (RSA) Number of bits in a generated key: 2048

  1. Save the Public key generated in the step above as described in Device configuration section.
  2. Login to device using private key generated above with username as admin.

Linux

If using a Linux PC and SSH from the Linux host, then you can generate the keys with the fo

  1. Generate key pair executing below command on Linux console as shown in Figure 89.

Figure 89 Public Key location path

pk@ubuntu:~$ ssh-keygen -t rsa
Generating public/private rsa key pair.
Enter file in which to save the key (/home/pk/.ssh/id_rsa):
Created directory '/home/pk/.ssh'.
Enter passphrase (empty for no passphrase):
Enter same passphrase again:
Your identification has been saved in /home/pk/.ssh/id_rsa.
Your public key has been saved in /home/pk/.ssh/id_rsa.pub.
The key fingerprint is:
SHA256:0qt4vJduO4uvpdptPkNzQ9uor1H7ydwE9fiEXOh0Kao pk@ubuntu
The key's randomart image is:
+----[RSA 2048]----
|    |
|    ..|
|    .+.o|
|    . ..=.* |
|    . S..=. = o|
|    .oo*... o |
|    ..+E.. . |
| oo*X. + +
| ooBXOO. = .
+----[SHA256]----
pk@ubuntu:~$ 
  1. The public key is now located in PATH as mentioned in Figure 89.
PATH = "Enter the file to which to save the key" 
  1. The private key (identification) is now saved in PATH as mentioned in Figure 90.
PATH = "Your identification has saved in <>" 

Figure 90 Private Key saved path

pk@ubuntu:~$ cat /home/pk/.ssh/id_rsa.pub
ssh-rsa AAAAB3NzaClyc2EAAAADAQABAAABAQDfZq+gc13qG8D1ckyfU2JqyW5pI9q8P0MrVtrM9Vu5P851kbIiCtsTmPm6Ewrfq/nhWWsn6k4p20pTZ/laX/Ww9BWf4jjw8nOqNY95zlJUD9mV48gqrOY8qbXv5gybXLZ+A0LarSgDaeoasM34xiJEqL+/GWkJW9/ckyueliSwAeX8ki++zJeIOQZrJWcJ6mlYHZfd4Yyb1LRg78L+q4YbHZAdkooUkTNXJ0kaBwR2i3OJjHxD1D+SRE3DrP9xAAD11cB5MvgQNWeBJ4ale4rwkphPQetH/lisY/DI9nkr8Hwul2JEDeMq5yII7Fdh6ALJb+b2mtZnbGBxdsM4HrTt pk@ubuntu
pk@ubuntu:~$
pk@ubuntu:~$ 
  1. Save the public key generated in step above as described in the Device configuration section.

  2. Login to device using private key generated above with username as admin.

RADIUS authentication

Device management access using RADIUS authentication allows multiple users to access using unique credentials and is secured.

Device configuration

Management access using the RADIUS authentication method can be configured on the device from cnMaestro. Navigate to AP Groups > Management and configure the following:

  1. Select the RADIUS Mgmt Authentication check box.

  2. Configure RADIUS IPv4/Hostname and shared secret in the RADIUS Server and RADIUS Secret parameters respectively.

  3. Click Save.

Figure 91 RADIUS Server and RADIUS Secret parameters
AP Groups > Add New Basic Management Radio Network Security Access Control Services User-Defined Overrides Administrator Access Admin Password Configure password for authentication of GUI and CLI sessions (max 32 characters) Telnet Enable Telnet access to the device CLI SSH Enable SSH access to the device CLI SSH Key Show Use SSH keys instead of password for authentication HTTP Enable HTTP access to the device GUI HTTP Port 80 Port for HTTP access to the device GUI (1-65535) HTTPS Enable HTTPS access to the device GUI HTTPS Port 443 Port for HTTPS access to the device GUI (1-65535) RADIUS Mgmt Authentication Enable RADIUS authentication of GUI/CLI sessions RADIUS Server RADIUS server IPIHostname RADIUS Secret RADIUS server shared secret

Mesh

From Release 6.4 onwards, Enterprise Wi-Fi Access Points support mesh connections between radios. suggested maximum hops are two. Mesh links can form between radios of the same band of open GHz, 5 GHz, and 6 GHz), but the two peers of the mesh link do not have to be of the same example, a link between Wi-Fi 6 XV2-21X and XV2-23T is supported. Given the larger set of available channels and typically cleaner RF environment, Cambium Networks recommends using the 6 GHz rad mesh backhaul if the AP is 6 GHz-capable, else use the 5 GHz band.

A mesh link can be created between two radios by configuring one of them as a Base and the Client on the first WLAN of the AP. Typically, the wired connectivity AP would be configured as (MB). The radio setup for the MB selects a channel and starts transmitting beacons as soon as t up. The Mesh Client (MC) radio setup scans all available channels, looking for an MB radio to cc The SSID in the mesh WLAN is how the client and base radios of a mesh link identify each c SSID should be configured on the MB WLAN as well as the MC WLAN.

In addition to a simple topology between a base and a client, a star or hub-and-spoke mesh top supported; practically a mesh radio can service up to 10-12 Mesh Clients connected to it. When a configured with a mesh WLAN, on that WLAN other clients are allowed to connect, and the radio clients on other WLANs mapped to it. Note that a client radio starts rescanning all available channels as it loses connectivity to the base. Other WLANs mapped to it are not operational during this s

The mesh link can also be secured with WPA2/WPA3-Preshared-Keys (PSK). The same passphrase sh be configured on both the MB as well as the MC. Standard 802.11 security handshakes and AES-0 encryption are then used on the mesh link.

For WPA2-PSK, the maximum number of allowed characters is 64 whereas for WPA3-PSK, it is 63.

Deployment scenarios

Enterprise Wi-Fi APs support single and multi-hop mesh connections, although single hop mesh is hi advisable.

Enterprise Wi-Fi APs support the following deployment scenarios:

  • Between Cambium APs
  • With third-party APs, such as TP-Link, MikroTik, and LigoWave

Enterprise Wi-Fi APs support the following deployment scenarios:

  • Between Wi-Fi 6 APs
  • Mixed deployment (between Wi-Fi 6 APs and Wi-Fi 5 APs)
  • With third-party APs - TP-Link, MikroTik, and LigoWave

The following figures illustrate the working scenario of a wireless mesh network.

Figure 92 Single hop mesh connection in 5 GHz with two Mesh Clients
Cambium Networks XE5-8 - Deployment scenarios - 1

flowchart
graph TD
    A["Client Connection"] -->|2.4 GHz| B["Mobile Device"]
    A -->|5 GHz| C["Mobile Device"]
    B -->|5 GHz| D["Client Connection"]
    C -->|2.4 GHz| D
    C -->|5 GHz| E["Mobile Device"]
    D -->|2.4 GHz| E
    style A fill:#f9f,stroke:#333
    style B fill:#ccf,stroke:#333
    style C fill:#cfc,stroke:#333
    style D fill:#fcc,stroke:#333
    style E fill:#cff,stroke:#333

Figure 93 Single hop mesh connection in 5 GHz with two Mesh Clients and 2.4 GHz and 5 GHz as access

Cambium Networks XE5-8 - Deployment scenarios - 2

flowchart
graph TD
    A["Mobile Device"] -->|2.4 GHz| B["Client Connection"]
    A -->|5 GHz| C["Mobile Device"]
    B -->|5 GHz| D["Client Connection"]
    B -->|5 GHz| E["Mobile Device"]
    C -->|2.4 GHz| F["Client Connection"]
    C -->|5 GHz| G["Mobile Device"]
    D -->|5 GHz| H["Mobile Device"]
    E -->|2.4 GHz| I["Mobile Device"]
    E -->|5 GHz| J["Mobile Device"]

Figure 94 Single hop mesh Connection in 6 GHz with two Mesh Clients
Cambium Networks XE5-8 - Deployment scenarios - 3

flowchart
graph TD
    A["Mobile Device"] -->|2.4 GHz| B["Client Connection"]
    A -->|6 GHz| C["Mobile Device"]
    B -->|6 GHz| D["Mobile Device"]
    B -->|2.4 GHz| E["Client Connection"]
    C -->|5 GHz| F["Mobile Device"]
    C -->|6 GHz| G["Mobile Device"]
    D -->|2.4 GHz| H["Mobile Device"]
    D -->|5 GHz| I["Mobile Device"]
    E -->|2.4 GHz| J["Mobile Device"]
    E -->|5 GHz| K["Mobile Device"]
    F --> L["Mobile Device"]
    F --> M["Mobile Device"]
    G --> N["Mobile Device"]
    G --> O["Mobile Device"]
    H --> P["Mobile Device"]
    H --> Q["Mobile Device"]
    I --> R["Mobile Device"]
    I --> S["Mobile Device"]
    J --> T["Mobile Device"]
    J --> U["Mobile Device"]
    K --> V["Mobile Device"]
    K --> W["Mobile Device"]

For a stable mesh link to be established, Enterprise Wi-Fi mesh is configurable in the following th

- Mesh Base (MB)

Enterprise Wi-Fi device that operates in MB mode is the key to Mesh topology. MB is usually to the wired network. The radio setup for MB selects a channel and starts transmitting beacon as the AP comes up.

- Mesh Client (MC)

Enterprise Wi-Fi device that operates in MC mode, scans all available channels supported as per regulatory domain and establishes a link with MB.

- Mesh Recovery (MR)

When enabled, this mode helps maintain the mesh link if there is a disruption in the backhaul established with MB and MC. Mesh link disruption can cause due to PSK mismatch or due to asynchronous configurations on MB and MC. This mode needs to be exclusively enabled on ME devices.

This mode can also help in the Zero Touch Configuration of the Enterprise Wi-Fi device.

Mesh configurable parameters

The below table lists the configurable parameters that are exclusive to mesh:

Table 62 Mesh configurable parameters

ParameterDescription Range Default
Mesh Thisparameter is required when a mesh connection is established with Enterprise Wi-Fi devices. Four options are available under parameter:1. Base: A WLAN profile configured with a Mesh Base operates like a normal AP. Its radio beacon is on startup so its SSID can be seen by radios configured as Mesh Clients.2. Client: A WLAN profile configured with a Mesh Client scans all available channels on startup, looking for a mesh-based AP to connect.3. Recovery: A WLAN profile configured as mesh-recovery broadcast pre-configured SSID upon detection of mesh link failure after a successful connection. This needs to be exclusively configured on the mesh-base device. Mesh Client auto-scan for mesh-recovery SSID upon failure of mesh link.this
SSID SSIDis the unique network name to which MC connects and establishes mesh links.-
VLAN ManagementVLAN to access all devices in a mesh topology. 1-4094 1
Security Forconfigurable parameters, refer to Chapter 6: Security section. -Open
PassphraseA string that is a key value to generate keys based method configured.-on12345678
Radios EachSSID can be configured to be transmitted as per the 2.4 GHz deployment requirement. For a mesh WLAN profile, options available to configure the band:• 2.4 GHz• 5 GHz• 6 GHz
Hide SSIDThis is the basic security mode of a Wi-Fi device. when enabled, will not broadcast SSID.ThisDisplacetheter
SNR-thresholdMesh Clients trigger a disconnect when SNR is below value. This is the applicable configuration on the MB.1-4094678Disabled
Mesh Recovery IntervalConfigure the interval for the consecutive ping loss se which the mesh link is considered to be down and attempted. One can configure the duration and interval same, in which case the first ping losses trigger the5-30after mirreconnect is to be reconnect.30
Mesh Auto Detect Backhaul1. Single HopBoth Mesh Client and MB profiles are configured on the devices. When enabled, this feature triggers when an MB losses Ethernet connectivity. Mesh Client profile automatically gets enabled and establishes a mesh link with the nearest MB. For the MB profile to get auto-disabled, uncheck Mesh Multi-Hop.2. Multi-HopConsider Mesh Client AP is connected to an MB AP which has an Ethernet backhaul connection. In case MB which has the backhaul connection loses the Ethernet connectivity, both APs disconnect from the network. When Auto detected Backhaul is enabled on the MB, it automatically enables the MC profile and connects to the nearest MB ensuring the connectivity for self as well as the client behind. Mesh Multi-Hop check should be enabled for this feature to be active.3. Mesh Monitored HostThis parameter is exclusive to Mesh Client devices when Auto-Detect Backhaul is enabled with an extended network via the Ethernet of the device. Configure IP or Hostname to check the link status.- Disabledonthe network. When Auto detected Backhaul is enabled on the MB, it automatically enables the MC profile and connects to the nearest MB ensuring the connectivity for self as well as the client behind. Mesh Multi-Hop check should be enabled for this feature to be active.3. Mesh Monitored HostThis parameter is exclusive to Mesh Client devices when Auto-Detect Backhaul is enabled with an extended network via the Ethernet of the device. Configure IP or Hostname to check the link status.
Mesh Client Monitor1. Duration Duration in minutes of ping failure after connectivity is re-established.2. Host Configure a server to monitor with ping to connectivity needs to be re-established.which meshdecide if mesh
Mesh Vlan TaggingEnable the VLAN tagging over the mesh link. This applied to the Cambium mesh topology.Enabled to

Order of Mesh profile configuration

If a device is configured as Mesh Base/client/recovery, the recommended order of WLAN configuration should be as follows:

  • WLAN profile 1: Mesh Base
  • WLAN profile 2: Mesh Client

- WLAN profile 3: Mesh Recovery

Mesh Base (MB)

To configure the MB:

cnMaestro configuration:

WLANs > Ent_Mesh_Base Configuration Devices WLAN AAA Servers Guest Access Access Control Basic Information Type* Enterprise Wi-Fi Name* Ent_Mesh_Base Description Basic Settings SSID Enable SSID* CAMBIUM_MESH_BASE The SSID of this WLAN (up to 32 characters) Mesh Base Mesh Base/Client/Recovery mode VLAN* 1 Default VLAN assigned to clients on this WLAN (1:4094) Security WPA2 Pre-Shared Keys Set authentication and encryption type Passphrase* ............ Show WPA2 Pre-shared security passphrase or key Band 2.4 GHz 5 GHz 6 GHz Define radio types (2.4 GHz, 5 GHz, 6 GHz) on which this WLAN should be supported Client Isolation Disable When selected, it allows wireless clients connected to the same AP or different APs to communicate with each other in the same VLAN Hide SSID Do not broadcast SSID in beacons Mesh Vlan Tagging Enable the vlan tagging over mesh link Mesh Auto Detect Backhaul Enable the ethernet link status detection and try to connect over mesh link

CLI configuration:

ap(config-wlan-1)# Mesh Base
ap(config-wlan-1)# ssid CAMBIUM_MESH_BASE
ap(config-wlan-1)# security wpa2-psk
ap(config-wlan-1)# passphrase 12345678
ap(config-wlan-1)# VLAN 1 

ap(config-wlan-1)# band 5GHz

Mesh Client (MC)

To configure the MC:

cnMaestro configuration:

WLANs > Ent_Mesh_Client Configuration Devices WLAN Basic Information Type* Enterprise Wi-Fi Name* Ent_Mesh_Client Description Basic Settings SSID Enable SSID* CAMBIUM_MESH_BASE The SSID of this WLAN (up to 32 characters) Mesh Client Mesh Base/Client/Recovery mode VLAN* 1 Default VLAN assigned to clients on this WLAN (1-4094) Security Open Set authentication and encryption type Transition SSID Configure the matching open/lowe transition SSID Band 2.4 GHz 5 GHz 6 GHz Define radio types (2.4 GHz, 5 GHz, 6 GHz) on which this WLAN should be supported Mesh Vian Tagging Enable the vlan tagging over mesh link

AP Groups > Ent_Mesh_ZeroTouch_APGrp Dashboard Notifications Configuration Statistics Devices Clients Mesh Peers Basic User-Defined Overrides Advanced configuration settings entered below will be applied on top of the AP Group settings sent to the device. This allows you to apply configuration not supported in the previous screens. If there are conflicts, the below settings will take precedence. The format used is the same as a configuration file exported from the device via its web UI or the "View Device Configuration" link in the device level configuration page. Variables and Macros Settings entered are not validated or error-checked (However, roller ($), period (.) or space characters are not allowed in a variable name and it should not be more than 64 characters long), and they may overwrite configuration made in previous screens, so please use them with caution. You are responsible for ensuring the resulting AP Group is valid and safe to use. User-Defined Overrides wireless wan 1 mesh recovery-interval 5 mesh-client-monitor host 88.03 mesh-client-monitor duration 2

CLI configuration:

ap(config)# wireless wlan 1
ap(config-wlan-1)# mesh client
ap(config-wlan-1)# ssid CAMBIUM_MESH_BASE
ap(config-wlan-1)# vlan 1
ap(config-wlan-1)# security wpa2-psk
ap(config-wlan-1)# passphrase 12345678
ap(config-wlan-1)# band 5GHz
ap(config-wlan-1)# mesh-recovery-interval 30
ap(config-wlan-1)# mesh-client-monitor duration 5
ap(config-wlan-1)# mesh-client-monitor host 8.8.8.8 

Mesh Recovery (MR)

To support plug and play Mesh deployment model, suggest configuring the MR profile on the MB result, factory reset APs/New APs can establish a mesh connection to the MB right away (out of

A recovery profile is also useful when an MC loses connectivity to a base due to misconfiguration connection that causes frequent drops.

To configure the MR:

cnMaestro configuration:

WLANs > Ent_Mesh_Recovery Configuration Devices WLAN Access Control Basic Information Type* Enterprise Wi-Fi Name* Ent_Mesh_Recovery Description Basic Settings SSID Enable Mesh Recovery Mesh Base/Client/Recovery mode VLAN* 1 Default VLAN assigned to clients on this WLAN (1-4094) Transition SSID Configure the matching open/owe transition SSID Band 2.4 GHz 5 GHz 6 GHz Define radio types (2.4 GHz, 5 GHz, 6 GHz) on which this WLAN should be supported

CLI configuration:

ap(config-wlan-1)# mesh recovery
ap(config-wlan-1)# vlan 1
ap(config-wlan-1)# band 5GHz 

Please refer to the Cambium Zero touch White paper on mesh for more information on Zero touch Mesh.

Mesh SNR-threshold

SNR-threshold configuration parameter is supported via CLI and can also be provisioned via cnMaestr the MB WLAN profile. This parameter helps in maintaining the quality of the mesh link by denying has a low SNR value than the configured threshold.

cnMaestro configuration:

AP Groups > Ent_Mesh_ZeroTouch_APGrp Dashboard Notifications Configuration Statistics Devices Clients Mesh Peers Basic User-Defined Overrides Advanced configuration settings entered below will be applied on top of the AP Group settings sent to the device. This allows you to apply configuration not supported in the previous screens. If there are conflicts, the below settings will take precedence. The format used is the same as a configuration file exported from the device via its web UI or the "View Device Configuration" link in the device level configuration page. Variables and Macros Settings entered are not validated or error-checked (However, dollar ($), period ( ) or space characters are not allowed in a variable name and it should not be more than 64 characters long), and they may overwrite configuration made in previous screens, so please use them with caution. You are responsible for ensuring the resulting AP Group is valid and safe to use. User-Defined Overrides wireless when 7 mesh on threshold 60

CLI configuration:

ap(config-wlan-1)# mesh snr-threshold 60 

Mesh Mode

Enterprise Wi-Fi APs support multi-radio, and by default channel distribution, is enabled. When channel distribution is enabled, each radio is mapped with a group of channels that it can operate.

When a device operates in MC, it will scan channels that are supported by the radio. Hence, the possibility that MC will never connect to MB. Mesh mode configuration is supported at the RADIO maintain the consistent link, the user has provision exclusively to configure mode on the radio to Mesh Clients are always connected to the network. To configure the Mesh mode:

cnMaestro configuration:

AP Groups > Ent_Mesh_ZeroTouch_APGrp Dashboard Notifications Configuration Statistics Devices Clients Mesh Peers Basic User-Defined Overrides Advanced configuration settings entered below will be applied on top of the AP Group settings sent to the device. This allows you to apply configuration not supported in the previous screens. If there are conflicts, the below settings will take precedence. The format used is the same as a configuration file exported from the device via its web UI or the "View Device Configurations" link in the device level configuration page. Variables and Macros Settings entered are not validated or error-checked (However: dollar (), period () or space characters are not allowed in a variable name and if should not be more than 64 characters (long), and they may overwrite configuration made in previous screens, so please use them with caution. You are responsible for ensuring the resulting AP Group is valid and safe to use. User-Defined Overrides wireless radio 3 allowed-vall-modes mesh

CLI configuration:

ap(config-radio-1)# allowed-wlan-modes mesh 

Mesh ACL

ACL can be used to make sure that the Mesh Client connecting to the base AP is a known A Client radio MAC address can be added to the Mesh Base AP to achieve this.

Following are the various modes of MAC authentication supported by Enterprise Wi-Fi APs:

- Allow

To enable this mode, add the list of MAC addresses either to be allowed or denied under "mac authentication list " and configure the device as below:

cnMaestro configuration:

MAC Authentication Policy Deny Permit RADIUS cnMaestro MAC Description Delete 00:04:56:11:22:33 Mesh client-Cambium Add New Showing 1-1 Total 1 TO - Previous Next >

CLI configuration:

ap(config-wlan-1)# mac-authentication policy allow 

- Deny

To enable this mode, add the list of MAC addresses either to be allowed or denied under "mac authentication list " and configure the device as below:

cnMaestro configuration:

MAC Authentication Policy Deny Permit RADIUS cnMaestro MAC Description Delete 00:04:56:11:22:33 Mesh client-Cambium Add New Showing 1-1 Total: 1 10 • Previous 1 Next •

CLI configuration:

ap(config-wlan-1)# mac-authentication policy deny 

- RADIUS

To enable this mode, configure the device (described in Chapter 7: Radius server section) on the MB WLAN profile as below:

cnMaestro configuration:

MAC Authentication Policy Denry Permit RADIUS cnMaestro Delimiter Password Upper Case

CLI configuration:

ap(config-wlan-1)# mac-authentication policy radius 

- cnMaestro

To enable this mode, define the MAC addresses allowed or denied as described in the cnMaestro Premises User Guide Association ACL section and configure the device on the MB WLAN profile as

cnMaestro configuration:

MAC Authentication

Policy

Cambium Networks XE5-8 - MAC Authentication - 1

CLI configuration:

ap(config-wlan-1)# mac-authentication policy cnMaestro 

Mesh Auto Detect Backhaul

Mesh Auto Detect backhaul is a mechanism to enable MB or MC WLAN profile based on the state ethernet of a device that is operating in mesh mode. Enterprise Wi-Fi APs are multi-radio and multi-supported, hence there are multiple ways of configuring this feature based on the number of ether of a device.

In general, customers use a single AP group to configure any mesh devices in a network. When is enabled, the device is intelligent enough to decide whether it has to operate in MB or MC n are different scenarios (AP2), where this feature can trigger a change in the mesh mode of the

Scenario 1

When a single AP Group is used for both MB and MC, AP2 can decide its mesh mode based eth2 connections. To auto-trigger, the type of mesh mode below configuration needs to be pushed APs in the mesh link.

Based on eth1 and eth2 physical link and reachability to 8.8.8.8 determines the state of mesh mo Below is a matrix that explains AP2 behavior:

Eth 1 Eth 28.8.8.8ReachabilityMB MC
ConnectedNo data enabledConnected with no network reachabilityNo Disabled Enabled
ConnectedNo data enabledConnected with network reachabilityYes Enabled Disabled
ConnectedData-enabledConnected with no network reachabilityNo Disabled Enabled
ConnectedData-enabledConnected with no network reachabilityYes Enabled Disabled
ConnectedData-enabledConnected with network reachabilityYes Enabled Disabled

Figure 95 Deployment Scenario 1
Cambium Networks XE5-8 - Scenario 1 - 1

flowchart
graph LR
    A["Network"] --> B["AP1 (MB)"]
    B --> C["AP2"]
    C --> D["Laptop"]
    C -->|Eth1| E["PoE"]
    C -->|Eth2| D

Scenario 2

When a single AP Group is used for both MB and MC, AP2 can decide its mesh mode based connections. To auto-trigger, the type of mesh mode below configuration needs to be pushed on at the mesh link.

Eth 1 8.8.8.8 Reachability MB MC
• ConnectedNo data enabledNo Disabled Enabled
• ConnectedData-enabledNo Disabled Enabled
• ConnectedData-enabledYes Enabled Disabled

Figure 96 Deployment Scenario 2

Cambium Networks XE5-8 - Scenario 2 - 1

flowchart
graph LR
    A["Network"] --> B["AP1 (MB)"]
    B --> C["AP2"]
    C --> D["Laptop"]
    C --> E["PoE"]
    style A fill:#blue,stroke:#333
    style B fill:#white,stroke:#333
    style C fill:#white,stroke:#333
    style D fill:#ccf,stroke:#333
    style E fill:#cfc,stroke:#333

Scenario 3

When a single AP Group is used for both MB and MC, AP2 can decide its mesh mode based connections. To auto-trigger, the type of mesh mode below configuration needs to be pushed on a

the mesh link.

Eth 1 8.8.8.8 Reachability MB MC
Connected No Disabled Enabled

Figure 97 Deployment Scenario 3

Cambium Networks XE5-8 - Scenario 3 - 1

flowchart
graph LR
    A["Network"] --> B["AP1 (MB)"]
    B --> C["AP2"]
    C --> D["PoE"]
    style A fill:#bluebubble
    style B fill:#white bubble
    style C fill:#white bubble
    style D fill:#yellow bubble
    note right of B: "AP1 (MB)"
    note right of C: "Eth1"

To enable this configuration either from cnMaestro or CLI, follow the below guidelines:

cnMaestro configuration:

Mesh Client

WLANs > Ent_Mesh_Client Configuration Devices WLAN Basic Settings SSID Enable SSID* CAMBIUM_MESH_BASE The SSID of this WLAN (up to 32 characters) Mesh Client Mesh Base/Client/Recovery mode VLAN* 10 Default: VLAN assigned to clients on this WLAN (1-4094) Security WPA2 Pre-Shared Keys Set authentication and encryption type Passphrase* Show WPA2 Pre-shared security passphrase or key Band 2.4 GHz 5 GHz 6 GHz Define radio types (2.4 GHz, 5 GHz, 6 GHz) on which this WLAN should be supported Mesh Vlan Tagging Enable the vlan tagging over mesh link Advanced Settings Mesh Monitored Host 8.8.8.8 IP or hostname that if not reachable a mesh recovery is attempted Mesh Monitor Duration 30 Duration in minutes (5-60) Mesh Recovery Interval 30 Interval in minutes after which a full recovery is attempted if the mesh base is not reachable (5-30)

Mesh Base

WLANs > Ent_Mesh_Base Configuration Devices WLAN AAA Servers Guest Access Access Control Enable SSID* CAMBIUM_MESH_BASE The SSID of this WLAN (up to 32 characters) Mesh Base Mesh Base/Client/Recovery mode VLAN* 10 Default VLAN assigned to clients on this WLAN (1-1094) Security WPA2 Pre-Shared Keys Set authentication and encryption type Passphrase* ............ Show WPA2 Pre-shared security pssphrase or key Band 2.4 GHz 5 GHz 6 GHz Define radio types (2.4 GHz, 5 GHz, 6 GHz) on which this WLAN should be supported Client Isolation Disable When selected, it allows wireless clients connected to the same AP or different APs to communicate with each other in the same VLAN Hide SSID Do not broadcast SSID in beacons Mesh Vian Tagging Enable the vlan tagging over mesh link Mesh Auto Detect Backhaul Enable the ethernet link status detection and try to connect over mesh link Mesh Multi Hop Enable/Disable the multi-hop mesh link support. This configuration will be used if and only if mesh auto detect backhaul feature is enabled.

AP Groups > Ent_Mesh_ZeroTouch_APGrp Dashboard Notifications Configuration Statistics Devices Clients Mesh Peers Basic Management Radio Network Security Services User-Defined Overrides User-Defined Overrides Advanced configuration settings entered below will be applied on top of the AP Group settings sent to the device. This allows you to apply configuration not supported in the previous screens. If there are conflicts, the below settings will take precedence. The format used is the same as a configuration file exported from the device via its web UI or the "View Device Configuration" link in the device level configuration page. + Variables and Macros Settings entered are not validated or error-checked (However, dollar ($), period (.) or space characters are not allowed in a variable name and it should not be more than 64 characters long), and they may overwrite configuration made in previous screens, so please use them with caution. You are responsible for ensuring the resulting AP Group is valid and safe to use. ! wireless wlan 7 mesh client band 5 ghz fast-roaming 802.1lr mesh-auto-detect-backhaul monitor-host

CLI configuration:

Mesh Client

ap(config-wlan-1)# mesh client 
ap(config-wlan-1)# ssid CAMBIUM_MESH_BASE
ap(config-wlan-1)# vlan 1
ap(config-wlan-1)# security wpa2-psk
ap(config-wlan-1)# passphrase 12345678
ap(config-wlan-1)# band 5GHz
ap(config-wlan-1)# mesh-client-monitor duration 5
ap(config-wlan-1)# mesh-client-monitor host 8.8.8.8 

Mesh Base

ap(config-wlan-7)# mesh base
ap(config-wlan-7)# ssid CAMBIUM_MESH_BASE
ap(config-wlan-7)# vlan 1
ap(config-wlan-7)# security wpa2-psk
ap(config-wlan-7)# passphrase 12345678
ap(config-wlan-7)# band 5GHz
ap(config-wlan-7)# mesh-auto-detect-backhaul
ap(config-wlan-7)# mesh-auto-detect-backhaul monitor-host

Mesh Muti-Hop

This topology is not a recommended solution but can be deployed in foreseen situations. In this 1 deployment, intermediate devices (AP2) in mesh links require both MB and MC to be enabled.

Figure 98 Multi-Hop deployment Scenario
Cambium Networks XE5-8 - Mesh Muti-Hop - 1

flowchart
graph LR
    A["Network"] --> B["AP1"]
    B --> C["AP2"]
    C --> D["AP3"]
    D --> E["Laptop"]
    D -->|Eth1| F["PoE"]
    D -->|Eth2| G["Computer"]

cnMaestro configuration:

WLANs > Ent_Mesh_Base Configuration Devices WLAN AAA Servers Guest Access Access Control SSID Enable SSID* CAMBIUM_MESH_BASE The SSID of this WLAN (up to 32 characters) Mesh Base Mesh Base/Client/Recovery mode VLAN* 10 Default VLAN assigned to clients on this WLAN (1-4094) Security WPA2 Pre-Shared Keys Set authentication and encryption type Passphrase* ******** Show WPA2 Pre-shared security passphrase or key Band 2.4 GHz 5 GHz 6 GHz Define radio types (2.4 GHz, 5 GHz, 6 GHz) on which this WLAN should be supported Client Isolation Disable When selected, it allows wireless clients connected to the same AP or different APs to communicate with each other in the same VLAN Hide SSID Do not broadcast SSID in beacons Mesh Vlan Tagging Enable the vlan tagging over mesh link Mesh Auto Detect Backhaul Enable the ethernet link status detection and try to connect over mesh link Mesh Multi Hop Enable/Disable the multi-hop mesh link support This configuration will be used if and only if mesh auto detect backhaul feature is enabled

CLI configuration:

ap(config-wlan-7)# mesh base
ap(config-wlan-7)# ssid CAMBIUM_MESH_BASE
ap(config-wlan-7)# vlan 1
ap(config-wlan-7)# security wpa2-psk
ap(config-wlan-7)# passphrase 12345678
ap(config-wlan-7)# band 5GHz
ap(config-wlan-7)# mesh-auto-detect-backhaul
ap(config-wlan-7)# mesh-auto-detect-backhaul monitor-host
ap(config-wlan-7)# mesh-auto-detect-backhaul multi-hop

Mesh Roaming

From Release 6.4 onwards Enterprise Wi-Fi APs support mesh roaming. For this functionality to be enable the below parameters (MB and MC) on mesh devices.

Mesh Base configuration

Enable 802.11r on the MB WLAN profile to support MC roaming.

cnMaestro configuration:

AP Groups > Ent_Mesh_ZeroTouch_APGrp Dashboard Notifications Configuration Statistics Devices Clients Mesh Peers Basic User-Defined Overrides Advanced configuration settings entered below will be applied on top of the AP Group settings sent to the device. This allows you to apply configuration not supported in the previous screens. If there are conflicts, the below settings will take precedence. The format used is the same as a configuration file exported from the device via its web UI or the "View Device Configuration" link in the device level configuration page. Variables and Macros Settings entered are not validated or error-checked (However, dollar ($), period (.) or space characters are not allowed in a variable name and it should not be more than 64 characters long), and they may overwrite configuration made in previous screens, so please use them with caution. You are responsible for ensuring the resulting AP Group is valid and safe to use. User-Defined Overrides ! wireless wlan 7 mesh base fast-roaming 802.1ir !

CLI configuration:

ap(config-wlan-1)# fast-roaming 802.11r 

Mesh Client configuration

For Mesh Client roaming to be operational, enable or configure the below parameters on the radio the mesh client is enabled.

Table 63 Mesh Client configuration parameter

Parameters DescriptionRange Default
mesh-client-bgscanProvision to enable the Mesh Client backgroundscan. -Disabled
mesh-client-bgscan channel-listThe list of channels the Mesh Client needs to look for AP.to scan to -
mesh-client-bgscan long-intervalOnce APs RSSI goes above this value, scan every configured interval.in 600als and seconds300
mesh-client-bgscan roaming-rssi-thresholdAPs RSSI threshold to initiate a scan and roam.-100-0 dBm-65
mesh-client-bgscan short-intervalOnce AP's RSSI drops below this value, the scan will be triggered and follows the scanin 800diate seconds60

cnMaestro configuration:

AP Groups > Ent_Mesh_ZeroTouch_APGrp Dashboard Notifications Configuration Statistics Devices Clients Mesh Peers Basic Management Radio Network Security Services User-Defined Overrides User-Defined Overrides Advanced configuration settings entered below will be applied on top of the AP Group settings sent to the device. This allows you to apply configuration not supported in the previous screens. If there are conflicts, the below settings will take precedence. The format used is the same as a configuration file exported from the device via its web UI or the "View Device Configuration" link in the device level configuration page. + Variables and Macros Settings entered are not validated or error-checked (However, dollar ($), period () or space characters are not allowed in a variable name and it should not be more than 64 characters long), and they may overwrite configuration made in previous screens, so please use them with caution. You are responsible for ensuring the resulting AP Group is valid and safe to use. wireless radio 2 mesh-client-boscan mesh-client-boscan channel-list all-channels mesh-client-boscan roaming-rate-threshold -65 mesh-client-boscan Iono-interval 300 ! wireless wifi 1 mesh client band 5 ghz fast-roaming 802.1tr !

CLI configuration:

ap(config-radio-2)# mesh-client-bgscan
ap(config-radio-2)# mesh-client-bgscan channel-list all-channels
ap(config-radio-2)# mesh-client-bgscan roaming-rssi-threshold -65
ap(config-radio-2)# mesh-client-bgscan long-interval 300
ap(config-radio-2)# mesh-client-bgscan short-interval 60 

This section briefs about the configuration of the device to get a mesh link established with different deployment scenarios.

VLAN 1 as the management interface

Follow the below CLI commands to establish a mesh link with VLAN 1 as the management interfa

  1. To configure MB and MR, following are the commands:

- WLAN MB profile

cnMaestro configuration:

WLANs > Ent_Mesh_Base Configuration Devices WLAN AAA Servers Guest Access Access Control SSID Enable SSID* CAMBIUM_MESH_BASE The SSID of this WLAN (up to 32 characters) Mesh Base Mesh Base/Client/Recovery mode VLAN* 1 Default VLAN assigned to clients on this WLAN (1-4094) Security WPA2 Pre-Shared Keys Set authentication and encryption type Passphrase* ...... Show WPA2 Pre-shared security passphrase or key Band 2.4 GHz 5 GHz 6 GHz Define radio types (2.4 GHz, 5 GHz, 6 GHz) on which this WLAN should be supported Client Isolation Disable When selected, it allows wireless clients connected to the same AP or different APs to communicate with each other in the same VLAN Hide SSID Do not broadcast SSID in beacons Mesh Vlan Tagging Enable the vlan tagging over mesh link Mesh Auto Detect Backhaul Enable the ethernet link status detection and try to connect over mesh link

CLI configuration:

ap(config-wlan-1)# mesh base
ap(config-wlan-1)# ssid CAMBIUM_MESH_BASE
ap(config-wlan-1)# security wpa2-psk
ap(config-wlan-1)# passphrase 12345678
ap(config-wlan-1)# VLAN 1
ap(config-wlan-1)# band 5GHz 

- WLAN MR profile

cnMaestro configuration:

WLANs > Ent_Mesh_Recovery Configuration Devices WLAN Access Control Basic Information Type* Enterprise Wi-Fi Name* Ent_Mesh_Recovery Description Basic Settings SSID Enable Mesh Recovery Mesh Base/Client/Recovery mode VLAN* 1 Default VLAN assigned to clients on this WLAN (1-4094) Transition SSID Configure the matching open/owe transition SSID Band 2.4 GHz 5 GHz 6 GHz Define radio types (2.4 GHz, 5 GHz, 6 GHz) on which this WLAN should be supported

CLI configuration:

ap(config-wlan-1)# mesh recovery
ap(config-wlan-1)# vlan 1
ap(config-wlan-1)# band 5GHz 
  1. To configure MC, following are the commands:

cnMaestro configuration:

WLANs > Ent_Mesh_Client Configuration Devices WLAN Basic Settings SSID Enable SSID* CAMBIUM_MESH_BASE The SSID of this WLAN (up to 32 characters) Mesh Client Mesh Base/Client/Recovery mode VLAN* 1 Default VLAN assigned to clients on this WLAN (1-4094) Security WPA2 Pre-Shared Keys Set authentication and encryption type Passphrase* ............ Show WPA2 Pre-shared security passphrase or key Band 2.4 GHz 5 GHz 6 GHz Define radio types (2.4 GHz, 5 GHz, 6 GHz) on which this WLAN should be supported Mesh Vlan Tagging Enable the vlan tagging over mesh link Advanced Settings Mesh Monitored Host 8.8.8.8 IP or hostname that if not reachable a mesh recovery is attempted Mesh Monitor Duration 30 Duration in minutes (5-60) Mesh Recovery Interval 30 Interval in minutes after which a full recovery is attempted if the mesh base is not reachable (5-30)

CLI configuration:

ap(config-wlan-1)# mesh client
ap(config-wlan-1)# ssid CAMBIUM_MESH_BASE
ap(config-wlan-1)# vlan 1
ap(config-wlan-1)# security wpa2-psk
ap(config-wlan-1)# passphrase 12345678
ap(config-wlan-1)# band 5GHz
ap(config-wlan-1)# mesh-recovery-interval
ap(config-wlan-1)# mesh-recovery-interval 30
ap(config-wlan-1)# mesh-client-monitor
ap(config-wlan-1)# mesh-client-monitor duration 5
ap(config-wlan-1)# mesh-client-monitor host 8.8.8.8 
  1. To configure the Management VLAN interface, following are the commands:

cnMaestro configuration:

AP Groups > Ent_Mesh_ZeroTouch_APGrp Dashboard Notifications Configuration Statistics Devices Clients Mesh Peers Basic Management Radio Network Security Services User-Defined Overrides Ethernet Ports Ethernet Port 1 Ethernet Port 2 Ethernet Port 3 Ethernet Port 4 Ethernet Port 1 Trunk Multiple VLANs Native VLAN 1 Tagged Tag the native VLAN Allowed VLANs 2 4094 Eg: 1-3 or 4,10,22 Port Speed Auto Port Duplex Full Duplex

CLI configuration:

ap(config)# interface vlan 1
ap(config-vlan-1)# ip address dhcp
ap(config-vlan-1)# exit
ap(config)# interface eth 1
ap(config-eth-1)# switchport mode trunk
ap(config-eth-1)# switchport trunk native vlan 1
ap(config-eth-1)# switchport trunk allowed vlan 2-4094 

Non-VLAN 1 as the management interface

Follow the below CLI commands to establish a mesh link with non-VLAN 1 as the management in

  1. To configure MB and MR, following are the commands:

- WLAN MB profile

cnMaestro configuration:

WLANs > Ent_Mesh_Base Configuration Devices WLAN AAA Servers Guest Access Access Control Basic Settings SSID Enable SSID* CAMBIUM_MESH_BASE The SSID of this WLAN (up to 32 characters) Mesh Base Mesh Base/Client/Recovery mode VLAN* 10 Default VLAN assigned to clients on this WLAN (1-4094) Security WPA2 Pre-Shared Keys Set authentication and encryption type Passphrase* ............ Show WPA2 Pre-shared security passphrase or key Band 2.4 GHz 5 GHz 6 GHz Define radio types (2.4 GHz, 5 GHz, 6 GHz) on which this WLAN should be supported Client Isolation Disable When selected, it allows wireless clients connected to the same AP or different APs to communicate with each other in the same VLAN Hide SSID Do not broadcast SSID in beacons Mesh Vlan Tagging Enable the vlan tagging over mesh link Mesh Auto Detect Backhaul Enable the ethernet link status detection and try to connect over mesh link

CLI configuration:

ap(config-wlan-1)# mesh base
ap(config-wlan-1)# ssid CAMBIUM_MESH_BASE
ap(config-wlan-1)# security wpa2-psk
ap(config-wlan-1)# passphrase 12345678
ap(config-wlan-1)# VLAN 10
ap(config-wlan-1)# band 5GHz 

- WLAN MR profile

cnMaestro configuration:

WLANs > Ent_Mesh_Recovery Configuration Devices WLAN Access Control Basic Information Type* Enterprise Wi-Fi Name* Ent_Mesh_Recovery Description Basic Settings SSID Enable Mesh Recovery Mesh Base/Client/Recovery mode VLAN* 10 Default VLAN assigned to clients on this WLAN (1-4094) Transition SSID Configure the matching open/owe transition SSID Band 2.4 GHz 5 GHz 6 GHz Define radio types (2.4 GHz, 5 GHz, 6 GHz) on which this WLAN should be supported

CLI configuration:

ap(config-wlan-1)# mesh recovery
ap(config-wlan-1)# vlan 10
ap(config-wlan-1)# band 5GHz 
  1. To configure MC, following are the commands:

cnMaestro configuration:

WLANs > Ent_Mesh_Client Configuration Devices WLAN Basic Settings SSID Enable SSID* CAMBIUM_MESH_BASE The SSID of this WLAN (up to 32 characters) Mesh Client Mesh Base/Client/Recovery mode VLAN* 10 Default VLAN assigned to clients on this WLAN (1-4094) Security WPA2 Pre Shared Keys Set authentication and encryption type Passphrase* ............ Show WPA2 Pre-shared security passphrase or key Band 2.4 GHz 5 GHz 6 GHz Define radio types (2.4 GHz, 5 GHz, 6 GHz) on which this WLAN should be supported Mesh Vlan Tagging Enable the vlan tagging over mesh link Advanced Settings Mesh Monitored Host 8.8.8.8 IP or hostname that if not reachable a mesh recovery is attempted Mesh Monitor Duration 30 Duration in minutes (5-60) Mesh Recovery Interval 30 Interval in minutes after which a full recovery is attempted if the mesh base is not reachable (5-30)

CLI configuration:

ap(config-wlan-1)# mesh client
ap(config-wlan-1)# ssid CAMBIUM_MESH_BASE
ap(config-wlan-1)# vlan 10
ap(config-wlan-1)# security wpa2-psk
ap(config-wlan-1)# passphrase 12345678
ap(config-wlan-1)# band 5GHz
ap(config-wlan-1)# mesh-recovery-interval
ap(config-wlan-1)# mesh-recovery-interval 30
ap(config-wlan-1)# mesh-client-monitor
ap(config-wlan-1)# mesh-client-monitor duration 5
ap(config-wlan-1)# mesh-client-monitor host 8.8.8.8 
  1. To configure the Management non-VLAN interface, the following are the commands: cnMaestro configuration:

AP Groups > Ent_Me Dashboard Notifications C Basic Management Radio Network Security Services User-Defined Overrides Add VLAN VLAN ID Please enter VLAN ID (1 to 4094) IPv4 IP Address DHCP Static IP XXXXXXXXXX.XXX Netmask XXXXXXXXXX.XXX NAT When NAT is enabled, IP addresses under this Switched Virtual Interface are hidden DHCP Relay Agent XXXXXXXXXX.XXX Enable relay agent and assign DHCP server DHCP Option 82 Circuit ID None DHCP Option 82 Remote ID None Request Option All Enable DHCP request option all on this interface IPv6 General Update 1 dhcp disable enable Allow from Wired and Wireless Auto Configuration ✓ 10 dhcp disable disable Allow from Wired and Wireless Auto Configuration ✓

CLI configuration:

ap(config)# interface vlan 10
ap(config-vlan-10)# ip address dhcp
ap(config-vlan-10)# ip dhcp request-option-all
ap(config)# interface eth 1
ap(config-eth-1)# switchport mode trunk
ap(config-eth-1)# switchport trunk native vlan 1
ap(config-eth-1)# switchport trunk allowed vlan 2-4094 

Typical use-cases

• Wi-Fi access in areas with no cable run

° Add an AP indoor/outdoor APs for the areas that are difficult to reach

- Small retail location with one AP near an Ethernet outlet, and another in the middle of the I no easy cable run.

- Resolving coverage issues.

- Plug coverage holes

- Extend range outdoors

° An XV2-2T Hotspot in a parking lot outside a building, with XV2-2s providing Wi-Fi within th

Additional mesh topology supported

Cambium Networks XE5-8 - Additional mesh topology supported - 1

Note

The following topology supports zero touch provisioning and single AP group configuration.

Cambium Networks XE5-8 - Note - 1

flowchart
graph LR
    A["Network"] --> B["AP1"]
    B --> C["AP2"]
    C --> D["Printer"]
    D --> E["Computer"]
    E --> F["Document Icon"]

Wired devices behind mesh client AP

In this scenario, when wired devices are connected to the mesh client AP (AP2), the AP will sup touch provisioning and both base and client APs will have the same configuration (AP group). MesI have the capability to connect a separate LAN segment (containing wired devices) to the WLAN.

When an AP, with factory default configuration, is connected in the above scenario, the device wait seconds to obtain the IP address from the wired side. If the device does not receive any IP ad wired side, then mesh recovery is triggered. If the device restarts, the device waits for 360 second the IP address from the wired side. If the device does not receive any IP address from the wired mesh recovery is triggered.

Guest Access Portal - Internal

Introduction

Guest Access Portal services offer a simple way to provide secure access to the internet for user devices using a standard web browser. Guest access portal allows enterprises to offer authenticated to the network by capturing and re-directing a web browser's session to a captive portal login pa the user must enter valid credentials to be granted access to the network.

Modes of Captive Portal Services supported by Enterprise Wi-Fi AP devices:

  • Internal Access: Captive Portal server is hosted on the access point and is local to the AP.
  • External Access: Enterprise Wi-Fi AP is integrated with multiple third-party Captive Portal services vendors. Based on the vendor, the device needs to be configured. For more information, see Guest Access Portal - External.
  • cnMaestro: Captive Portal services are hosted on cnMaestro where various features like Social login, Voucher login, SMS login, and Paid login are supported. For more information, see Guest Access – cnMaestro.
  • EasyPass: EasyPass Access Services enable you to easily provide secure and controlled access to users and visitors on your Wi-Fi network.

This chapter describes about Internal Captive Portal services supported by Enterprise Wi-Fi APs. The following figure displays the basic topology of testing the Internal Captive Portal Service.

Figure 99 Topology
Cambium Networks XE5-8 - Introduction - 1

flowchart
graph TD
    A["Wireless Client"] -->|HTTP Request| B["Access Point"]
    B -->|Login/Splash page| A
    A -->|Login with credentials (Password, voucher etc)| B
    B -->|Welcome page| A
    C["RADIUS Server"] -->|RADIUS/LDAP| B
    D["Apply Policies: Session-Timeout, Rate-Limit etc"] --> A

Configurable parameters

The below figure displays multiple configurable parameters supported for Internal Guest Access hosted AP. Access Policy – Clickthrough.

Figure 100 Guest Access Internal Access Point parameter
WLANs > cm_test Configuration Devices WLAN AAA Servers Gustal Access Access Control Passpoint ePSk Basic Settings Enable Portal Mode Internal Access Point External Hotspot Access Policy Clickthrough: splash page where users accept terms and conditions to get on the network RADUS/ Splash page with username and password, authenticated with a RADIUS server LDAP. Redirect users to a login page for authentication by a LDAP server Local Guest Account (Redirect users) to a login page for authentication by local guest user account AP Server Protocol HTTP: Use unsecured HTTP protocol for AP guest access server HTTPS: Use secured HTTPS protocol for AP guest access server Redirect Hostname: Redirect Hostname for the splash page (up to 255 characters) Title: Title text in splash page (up to 255 characters) Contents: Main contents of the splash page (up to 255 characters) Terms: Terms and conditions displayed in the splash page (up to 255 characters) Logo: By http://www.com/propag/Logo to be displayed on the splash page Background Image: By http://www.com/backgroundImage Background Image to be displayed on the splash page Success Action Internal Lognal Page Redirect User to External URL Redirect User to Original URL Success Message Advanced Settings Redirect HTTP-only Enzyme redirection for HTTP juices only Redirect User Page: 1011 Configure IP address for redirecting user to guest portal splash page Redirection Port Port number (1 to 65533) Session Timeout Session time in seconds (60 to 2593300) Visibility Timeout Inactivity time in seconds (60 to 2593300) MAC Authentication Postlock Use guest access only as Facebook for clients fixing MAC authentication Extend Interface Configure the interface which is extended for guest access

Access policy

Click through

When this policy is selected, the user will get a login page to accept Terms and Conditions to get access to the network. No additional authentication is required.

Splash page

Title

You can configure the contents of the splash page using this field. Contents should not exceed n 255 characters.

Contents

You can configure the contents of the splash page using this field. Contents should not exceed n 255 characters.

Terms and conditions

Terms and conditions to be displayed on the splash page can be configured using this field. Terr conditions should not exceed more than 255 characters.

Displays the logo image updated in URL http(s)://. Either PNG or JPEG format is supported.

Background image

Displays the background image updated in URL http(s)://background>/. Either PNG or JPEG format of logo is supported.

Redirect parameters

Redirect hostname

Users can configure a friendly hostname, which is added to the DNS server and is resolvable to Wi-Fi AP IP address. This parameter once configured will be replaced with an IP address in the URL provided to wireless stations.

Success action

Provision to configure redirection URL after successful login to captive portal services. Users can co three modes of redirection URL:

- Internal logout Page

After successful login, the wireless client is redirected to the logout page hosted on AP.

- Redirect users to external URL

Here users will be redirected to the URL which we configured on a device as below:

- Redirect users to the Original URL

Here users will be redirected to a URL that is accessed by the user before successful captive authentication.

Redirect

By default, captive portal redirection is triggered when the user accesses either HTTP or HTTPS W enabled, redirection to Captive Portal Splash Page is triggered when an HTTP WWW is accessed by user.

Redirect Mode

There are two redirect modes available:

- HTTP Mode

When enabled, AP sends an HTTP POSTURL to the client.

- HTTP(s) Mode

When enabled, AP sends HTTPS POST URL to the client

Success message

This we can configure so that we can display success message on the splash page after success authentication

Timeout

Session

This is the duration of time which wireless clients will be allowed internet after guest access auth

Inactivity

This is the duration of time after which wireless clients will be requested for re-login.

Whitelist

Provision to configure either lps or URLs to bypass traffic, therefore users can access those IPs or without Guest Access authentication.

Configuration examples

This section briefs about configuring different methods of Internal Guest Access captive portal service hosted on AP.

Access Policy - Clickthrough

Figure 101 Authentication – redirected splash page
Cambium Networks Welcome to Cambium Networks Free Wi-Fi Hotspot Services Terms and Agreement You hereby expressly acknowledge and agree that there are significant security, privacy and confidentiality risks inherent in accessing or transmitting information through the internet. I Agree

Figure 102 Successful login – redirected splash page

Cambium Networks Welcome to Cambium Networks Welcome to Cambium Powered Hotspot You are free to Use Wi-Fi services Logout Session time remaining: 07:59:54

Guest Access Portal - External

Introduction

Guest access WLAN is designed specifically for BYOD (Bring Your Own Device) setup, where large organizations have both staff and guests running on the same WLAN or similar WLANs. Cambium N provides different options to the customers to achieve this based on where the captive portal page and who will be validating and performing the authentication process.

External Hotspot is a smart Guest Access provision supported by Enterprise Wi-Fi AP devices. This of Guest Access provides the flexibility of integrating an external 3rd party Web/Cloud hosted captiv fully customized. More details on third-party vendors who are integrated and certified with Cambium listed in the URL https://www.cambiumnetworks.com/wifi_partners/.

Configurable parameters

Figure 103 displays multiple configurable parameters supported for External Guest Access hosted on AP.
Figure 103 External Hotspot parameter
WLANs > cm_test Configuration Devices WLAN AAA Servers Guest Access Access Control Respoint ePbit Basic Settings Enable Portal Mode Internal Access Point External Hotspot Access Policy Clockthrough: Splash page where users accept terms and conditions to get on the network RADUS: Splash page with username and password, authenticated with a RADUS server LDAP: Redirect users to a login page for authentication by a LDAP server Local Guard Account Redirect users to a login page for authentication by local guest user account AP Server Protocol HTTP Use unsecured HTTP protocol for AP guest access server HTTPS User secured HTTPS protocol for AP guest access server Redirect Hostname Redirect Hostname for the spinach page (up to 205 characters) WISP Clients External Server Login External Page URL: External Portal Port Through cnMnastro External Port Type Sendout External Portal Type StandardX8F Success Action Internal Logout Page Redirect User to External URL Redirect User to Original URL Success Message Advanced Settings Redirection URL Query String Client IP: Include IP of client in the redirection url query strings RSS: Include max value of client in the redirection url query strings AP Location: Include AP Location in the redirection url query strings Redirect HTTP-only Enable redirection for HTTP packets only Redirect User Page 113 Configue IP address for reflecting user to guest portal splash page Redirection Port Port number (1 to 97535) Session Timesat 26800 Session time in seconds (60 to 2592000) Possibly Timeout 800 Inactivity time in seconds (60 to 2592000) MAC Authentication Fallback Use guest-accerta only at fallback for clients failing MAC authentication Extend Interface Configure the interface which is extended for guest access

Access policy

Clickthrough

When this policy is selected, the user will get a login page to accept Terms and Conditions to get access to the network. No additional authentication is required.

WISPr

WISPr clients external server login

Provision to enable re-direction of guest access portal URL obtained through WISPr.

External portal post through cnMaestro

This is required when HTTPS is only supported by an external guest access portal. This option will be enabled minimizes certification. The certificate is required to install only in cnMaestro.

External portal type

Only standard mode configuration is supported by Enterprise Wi-Fi AP products.

Standard

This mode is selected, for all third-party vendors whose Guest Access services is certified and inte with Enterprise Wi-Fi AP products.

Redirect parameters

Success action

Provision to configure redirection URL after successful login to captive portal services. Users can co three modes of redirection URL:

- Internal logout Page

After successful login, the wireless client is redirected to the logout page hosted on AP.

- Redirect users to external URL

Here users will be redirected to the URL which we configured on the device as below:

- Redirect users to the original URL

Here users will be redirected to a URL that is accessed by the user before successful captive authentication.

Redirect

By default, captive portal redirection is triggered when the user accesses either HTTP or HTTPS W enabled, redirection to Captive Portal Splash Page is triggered when an HTTP WWW is accessed t:

user.

Redirect mode

There are two redirect modes available:

- HTTP Mode

When enabled, AP sends an HTTP POSTURL to the client.

- HTTP(s) Mode

When enabled, AP sends HTTPS POST URL to the client

Success message

This we can configure so that we can display success message on the splash page after success authentication

Timeout

Session

This is the duration of time which wireless clients will be allowed internet after guest access auth

Inactivity

This is the duration of time after which wireless clients will be requested for re-login.

Whitelist

Provision to configure either lps or URLs to bypass traffic, therefore users can access those IPs or without Guest Access authentication.

Configuration examples

This section briefs about configuring different methods of External Guest Access captive portal service hosted on AP.

Access Policy - Clickthrough

Figure 104 Authentication – redirected splash page
Cambium Networks Welcome to Cambium Network Choose how to access our WiFi network Free Wi-Fi Hotspot Services Facebook Twitter Form Enjoy WiFi Services Powered by Cambium Networks

Figure 105 Successful Login - redirected splash page
facebook Create New Account Log in to Facebook Email address or phone number Password Log In Forgotten account? Sign up for Facebook Not now

Guest Access - cnMaestro

Cambium supports end-to-end Guest Access Portal services with a combination of Enterprise Wi-Fi AF cnMaestro. cnMaestro supports various types of authentication mechanisms for wireless clients to obtain Internet access. For further information about Guest Access Portal:

  • For On-Premises, go to https://support.cambiumnetworks.com/files/cnmaestro/ and download the latest cnMaestro On-Premises User Guide.
  • For cnMaestro Cloud, refer to the cnMaestro Cloud User Guide.

Auto VLAN

The Auto VLAN is intended to support zero-touch detection and configuration for connected Enterpris Fi APs. New Cambium vendor-specific LLDP TLVs are introduced starting with cnMatrix Release 3.1 t support “pushing” PBA policy data from Enterprise Wi-Fi APs to cnMatrix. The new PBA TLVs are implemented as an extension to the LLDP standard, using its flexible extension mechanism.

From a functional perspective, cnMatrix, acting as the upstream device, includes the PBA authentication in the regularly generated LLDPDUs for a port. The downstream device receives the PBA authentica TLV, and, if policy action data (for example VLANs) is present to be pushed to cnMatrix, a PBA settings TLV is constructed and added to the LLDPDU for the port.

The below table lists the fields that are required for configuring Auto-VLAN:

Table 64 Configuring Auto-VLAN parameters

ParametersDescription Range Default
Ildp pba New PBA TLVs is shared with cnMatrix switch. - Enabled
Ildp pba-auth-keyThe shared private key used during PBA TLV authenticbe updated or reset from its default value (by usingcation-enabledthe ‘no’woption).default key

Cambium Networks XE5-8 - Auto VLAN - 1

Note

lldp pba-auth-key default value cannot be shared due to security concerns.

CLI configuration:

Syntax:

ap(config)# lldp

ap(config)# lldp pba-auth-key

Example:

ap(config)# lldp pba
ap(config)# lldp pba-auth-key 123456789 

Device Recovery Methods

Factory reset via 'RESET' button

Table 65 Factory reset via RESET button

Access PointProcedure LED Indication
XV3-8 Pressand hold the Reset button for 15 secondsBoth LEDs will be OFF and turned Amber
XE5-8 Pressand hold the Reset button for 15 secondsBoth LEDs will be OFF and turned Amber
XV2-2 Pressand hold the Reset button for 15 secondsBoth LEDs will be OFF and turned Amber
XV2-2T0 Pressand hold the Reset button for 15 secondsBoth LEDs will be OFF and turned Amber
XV2-2T1 Pressand hold the Reset button for 15 secondsBoth LEDs will be OFF and turned Amber
XE3-4 Pressand hold the Reset button for 15 secondsBoth LEDs will be OFF and turned Amber
XE3-4TN Pressand hold the Reset button for 15 secondsBoth LEDs will be OFF and turned Amber
XV2-21X Pressand hold the Reset button for 15 secondsBoth LEDs will be OFF and turned Amber
XV2-23T Pressand hold the Reset button for 15 secondsBoth LEDs will be OFF and turned Amber
XV2-22H Pressand hold the Reset button for 15 secondsBoth LEDs will be OFF and turned Amber
X7-35X Pressand hold the Reset button for 15 secondsBoth LEDs will be OFF and turned Amber

Boot partition change via power cycle

Table 66 Boot partition change via power cycle

Access Point Procedure
XV3-8Follow power ON and off 9 times with an interval of 120 Sec

(ON) and 5 Sec (O

Access PointProcedure
XE5-8 Followpower ON and off 9 times with an interval of 120 Sec (ON)
XV2-2 Followpower ON and off 9 times with an interval of 120 Sec (ON)
XV2-2T0 Followpower ON and off 9 times with an interval of 120 Sec (ON)
XV2-2T1 Followpower ON and off 9 times with an interval of 120 Sec (ON)
XE3-4 Followpower ON and off 9 times with an interval of 120 Sec (ON)
XE3-4TN Followpower ON and off 9 times with an interval of 120 Sec (ON)
XV2-21X Followpower ON and off 9 times with an interval of 120 Sec (ON)
XV2-23T Followpower ON and off 9 times with an interval of 120 Sec (ON)
XV2-22H Followpower ON and off 9 times with an interval of 120 Sec (ON)
X7-35X Followpower ON and off 9 times with an interval of 120 Sec (ON)

and 5 Sec (OFF)

and 5 Sec (OFF)

I) and 5 Sec (OFF)

) and 5 Sec (OFF)

and 5 Sec (OFF)

) and 5 Sec (OFF)

) and 5 Sec (OFF)

) and 5 Sec (OFF)

J) and 5 Sec (OFF)

and 5 Sec (OFF)

Disable factory Reset Button

User can disable the physical Reset Button on the device by using the below CLI command:

ap(config)# no system hw-reset

Cambium Networks XE5-8 - Disable factory Reset Button - 1

Warning

The Reset Button is a key recovery option in situations when an AP gets misconfigured you are unable to connect to the AP.

By disabling the Reset Button, you lose the ability to recover the AP in such scenario:

Command-Line Interface (CLI)

The Enterprise Wi-Fi products support Command-Line Interface (CLI) which helps in configuring as we monitoring the devices.

Show commands

The below table provides Show commands supported in Enterprise Wi-Fi AP:

Table 67 Show commands supported in Enterprise Wi-Fi AP

SL NoCLI Command Description
Deep Packet Inspection (DPI)
1show application-statistics by-applicationDisplays statistics of each application that is accessed by the station connected to the AP.
2show application-statistics by-categoryDisplays statistics of application category that is accessed by the station connected to the AP.
Network Information
3show arpDisplays list of ARP entries learned by AP.
4show conntrackDisplays current connection track entries along with application ID Mapping.
5show routeDisplays IP route information.
6show dhcp-poolDisplays the DHCP pool configuration.
7show interface briefDisplays interface details such as IP, Netmask, and traffic statistics.
8show ip dhcp-client-infoDisplays the DHCP options learned by device across all interfaces.
9show ip domain-nameDisplays learned domain name information.
10show ip gw-source-precedenceDisplays the Precedence of gateway sources.
11show ip interfaceDisplays IP interface parameters.
12show ip name-serverDisplays DNS server information.
13show ip neighbourDisplays IPv4 neighbour entries.
14show ip routeDisplays IP route information.
15show ipv6 dhcp-client-infoDisplays learned DHCPv6 client information.
16show ipv6 domain-nameDisplays learned domain name information.
17show ipv6 gw-source-precedenceDisplays the precedence of gateway sources.
18show ipv6 interface briefDisplays IPv6 interface parameters.
19show ipv6 name-serverDisplays DNS server information.
20show ipv6 neighbourDisplays neighbour entries.
21show ipv6 routeDisplays IP route information.
Radio Information
22show auto-rf channel-infoDisplays Auto-RF channel information.
23show auto-rf historyDisplays Auto-RF history.
24show wireless band-steer client-cacheDisplays band steered client cache.
25show wireless mesh ipv6Displays IPv6 address of associated mesh clients
26show wireless mesh-xtnded-listDisplays mesh extended device list for 2.4 GHz mesh-xtnded-dev-list is enabled.
27show wireless neighbors 2.4GHzDisplays 2.4 GHz wireless neighbors.
28show wireless neighbors 5GHzDisplays 5G Hz wireless neighbors.
29show wireless neighbors 6GHzDisplays 6 GHz wireless neighbors.
30show wireless neighbors autocellDisplays Auto-cell neighbors.
31show wireless radios channelsDisplays supported channels.
32show wireless radios mu-mimo-statisticsDisplays MU-MIMO statistics of Radios.
33show wireless radios multicast-to-unicastDisplays multicast-to-unicast configuration.
34show wireless radios ofdma-statisticsDisplays OFDMA statistics of Radios.
35show wireless radios rf-statisticsDisplays statistics of Radios.
36show wireless radios statisticsDisplays statistics of Radios.
37show wireless wlans aggregate-statisticsDisplays aggregate statistics of wireless LANs.
38show wireless wlans interfaceDisplays wireless WLAN interface details.
39show wireless wlans monitor-hostDisplays monitor host information for wireless LAN

when

SL NoCLI Command Description
40show wireless wlan statisticsDisplays statistics of wireless LANs.
Bonjour Information
41show bonjour-servicesDisplays Bonjour services available.
42show bonjour-statisticsDisplays Bonjour rule statistics.
System Information
43show upgrade-statusDisplays last upgrade status.
44show versionDisplays device firmware information.
45show timezonesDisplays list of timezone locations.
46show management detailsDisplays management status in detail.
47show mfgromDisplays manufacturing ROM details.
48show country-codesDisplays a list of supported countries and corresponding country codes.
49show bootDisplays device firmware active-backup versions.
50show cambium-idDisplays configured Cambium-ID (if any).
51show clockDisplays system time.
52show config allDisplays current configuration including defaults.
53show config dhcp-pools allDisplays DHCP pools configuration including defaults.
54show config filterDisplays Filter configuration.
55show config wireless allDisplays wireless configuration including defaults.
56show config system allDisplays infra configuration including defaults.
57show config system interfacesDisplays network interface configuration.
58show eventsDisplays recent event messages.
Guest Access
59show ext-guest clientsDisplays information of ext-guest clients.
Filters
60show filter-statisticsDisplays filter statistics.
LLDP
61show lldp chassisDisplays local chassis data.
62show lldp configurationDisplays configuration.
63show lldp interfacesDisplays interfaces data.
64show lldp neighborsDisplays neighbors data.
65show lldp statisticsDisplays statistics.
66show powerDisplays power conditions.
67show packet-capture statusDisplays status of packet capture.
Real-Time Location System
68show rtls aeroscout ble-tag-summaryDisplays AeroScout BLE-tag summary.
69show rtls aeroscout configurationDisplays AeroScout Wi-Fi-tag configuration.
70show rtls aeroscout wifi-tag-summaryDisplays AeroScout Wi-Fi-tag summary.
Tunnel
71show tunnel-statisticsDisplays tunnel statistics.
72show tunnel-status detailsDisplays tunnel parameters.
73show ip pppoe-client-infoDisplays learned PPPoE client information.
74show pppoe-statusDisplays PPPoE status.

Service commands

Service show

The below table provides Service show commands supported in Enterprise Wi-Fi AP:

Table 68 Service show commands supported in Enterprise Wi-Fi AP

SL NoCLI Command Description
1service show bridgeDisplays AP bridge table entries.
2service show client-cacheDisplays current client status and history of clients and respective parameters.
3service show configDisplays configuration from data base.
SL NoCLI Command Description
4service show coresDisplays process cores (if any).
5service show debug-logsDisplays debug logs of various processes.
6service show dfDisplays flash status.
7service show dmesgDisplays system kernel logs.
8service show epskDisplays ePSK information.
9service show ethtoolDisplays information and statistics w.r.t Ethernet interfaces.
10service show guest-portal whitelist wlanDisplays whitelist entries either configured or auto-selected by a device in a guest portal WLAN profile.
11service show ifconfigDisplays status and statistics of all interfaces configured and supported on the device.
12service show iperfd-logsDisplay IPERF logs when iperfd daemon is enabled on device.
13service show iwconfigDisplays status and statistics of all Wireless interfaces configured on the device.
14service show last-reboot-reasonDisplays the reason for the last reboot of the AP.
15service show last-reboot-state watchdogDisplays if the last reboot reason is due to watchdog.
16service show mcastsnoopDisplays multicast-snoop tables.
17service show mdnsd-statisticsDisplays mDNS packet stats on mdnsd.
18service show memoryDisplays memory information.
19service show netstatDisplays network socket connections.
20service show psDisplays a list of processes.
21service show ps-restart-historyDisplays history of process restart on the AP.
22service show routeDisplays routing table.
23service show topDisplays process activity status.

Service system

The below table provides Service system commands supported in Enterprise Wi-Fi AP:

Table 69 Service system commands supported in Enterprise Wi-Fi AP

SL NoCLI Command Description
1service boot backup-firmwareHelps to boot to other partition.
2service clear-coresClear system core files (if any).
3service clear-dhcp-poolClear DHCP pool allocated addresses.
4service debuglogging-levelCommands to enable debugging of processes at various logging levels.
5service flash-ledsFlash system LEDs help identify this device visually.
6service radio apstatsDisplays aggregate statistics of all wireless interfaces.
7service radio athstatsDisplays aggregate Radio traffic statistics.
8service radio iwprivDisplays supported iwpriv commands.
9service radio thermaltoolDisplays radio current operating temperature.
10service schedule reloadReboot AP at the specified time.
11service ssh host addAdd a host and key to the known hosts list.
12service ssh host delDelete a host and key from the known hosts list.
13service system-traceStart a trace session for troubleshooting.
14service test ledsDisplays test LEDs.
15service test radioDisplays status and configured Radio.

Cambium Networks XE5-8 - Service system - 1

Note

This feature is available from cnMaestro 4.1.0 and later versions only.

The cnMaestro X Assurance feature provides enhanced visibility into the health of Wi-Fi client connec including root cause analysis of failures with possible recommended actions. It also provides analytics aggregated data that can help to improve clients connectivity in the Wi-Fi network.

The cnMaestro X Assurance feature analyzes the Wi-Fi client connection events and helps to troubles common network connectivity and performance issues such as the following:

  • Connectivity—Association, authentication, and network connectivity services, such as DHCP and DNS transaction failures.
  • Poor Performance—Low RSSI, low data rate, AAA, DHCP, DNS transaction latency.

For more information, refer to the cnMaestro User Guide.

MarketApps

The MarketApps feature in cnMaestro offers customized solutions for efficiently managing Wi-Fi service residential settings, such as multi-dwelling units (MDUs) and apartment complexes. It provides specialized tools (applications or Apps) that enhance operational efficiency and cater to the distinct requirements both property managers and residents.

Target audience

  • Property managers—The MarketApps feature empowers property managers to centrally administer Wi-Fi access across their properties. They can set up community-wide Wi-Fi networks and manage personal Wi-Fi networks for local residents.
  • Residents—Residents can set up and manage their own Wi-Fi networks within the community, ensuring personalized and secure Internet access.
  • Solution providers—Solution providers can utilize MarketApps to offer tailored Wi-Fi solutions, enhancing network performance and user satisfaction in multi-dwelling units and apartment complex

Benefits

  • Centralized management—Property managers can oversee and control Wi-Fi access across multiple units or buildings from cnMaestro.
  • Customization—Residents can set up personal Wi-Fi networks with customized SSIDs and password enhancing their user experience.

To access MarketApps, navigate to Network Services > MarketApps in cnMaestro.

For more information on configuring and viewing MarketApps, refer to the cnMaestro User Guide.

CLI configuration

To enable MarketApps using AP CLI, execute the following command:

ap(config)# wireless wlan 2
ap(config)# epsk cnMaestro 

AFC

The XE3-4TN Enterprise Wi-Fi 6E Access Point (AP) is designed to support Standard Power operation 6 GHz band for the outdoor deployments. Standard Power operation enables extended coverage and higher transmit power up to 36 dBm EIRP making it suitable for enterprise-grade and outdoor wire networks.

However, Standard Power operation in the 6 GHz band introduces regulatory requirements to prevent interference with incumbent licensed services such as fixed microwave links and public safety communications. To address this, the Federal Communications Commission (FCC) in the United States Innovation, Science and Economic Development (ISED) in Canada mandate the use of Automated Frequency Coordination (AFC) for all Standard Power Access Points.

The XE3-4TN AP has a built-in GPS receiver with the external antenna connector to automatically co-geographical co-ordinates (latitude, longitude, and height).

This chapter describes the following topics:

• Supported AP firmware version
• Supported cnMaestro version
• Supported countries
- AFC

Supported AP firmware version

AFC is supported in APs running Enterprise Wi-FI AP firmware version 7.1.1 and later.

Supported cnMaestro version

AFC is supported on cnMaestro Cloud.

Supported countries

AFC is supported only in the United States of America (USA) and Canada countries.

AFC 6 GHz frequency range support

Sl. NoCountry 6 GHz frequency range
1 United States of America (USA) U-NII-5: 5925 - 6425 MHzU-NII-7: 6525 - 6865 MHz
2 Canada U-NII-5: 5925 - 6425 MHzU-NII-6: 6425 - 6525 MHz

Cambium Networks XE5-8 - AFC 6 GHz frequency range support - 1

Note

* U-NII 6 will be supported for Canada in a future release.

Prerequisites for AFC Operation

The following prerequisites are required for AFC to operate feasibly.

• cnMaestro Cloud management

AP must be managed from cnMaestro Cloud

• IP network connection to the AFC server

  • Establish connectivity between the AP and the AFC server.
  • Whitelist the following URLs in the firewall:

■ https://api.qcs.qualcomm.com
■ https://afcapi.qcs.qualcomm.com
■ https://afcapi.canada.qcs.qualcomm.com

- GPS antenna

The AP must be connected with the Cambium supplied GPS antenna. (Part number: ANT-GPS-C) Ensure that the GPS antenna is clearly exposed to the sky.

- AP placement

AP placement must be configured as outdoor in the cnMaestro AP Group configuration.

AFC Operation

Cambium Networks XE5-8 - AFC Operation - 1

flowchart
graph TD
    A["CNMaestro Cloud"] -->|AP Registration| B["AFC"]
    B --> C["FCC Database"]
    A --> D["XE3-4TN"]
    B --> E["AFC Data Fetch"]
    E --> A
    style A fill:#f9f,stroke:#333
    style B fill:#ccf,stroke:#333
    style C fill:#cfc,stroke:#333
    style D fill:#fff,stroke:#333
    style E fill:#fcc,stroke:#333

Steps 1 to 6 are part of a one-time procedure for APs that are onboarded to cnMaestro for the for APs that are running factory default configuration.

1. AP onboarding and registration

a. When an AP (in US or Canada, and with 6 GHz capability) is powered on and onboarded to cnMaestro.
b. The AP sends a registration message with an AFC flag to indicate it needs AFC.

2. cnMaestro contacts AFC server

a. cnMaestro communicates with the AFC server and retrieves the following:

  • Shared secret (authentication key)
  • Registration URL
    • Spectrum Inquiry URL

b. cnMaestro shares the above information with the AP.

3. AP sends request to obtain AFC token

a. AP sends a request using the shared secret and registration URL to obtain the AFC token.

4. AP waits for the GPS lock

a. AP obtains information from the GPS receiver on the location (latitude, longitude, altitude).

5. AP sends Spectrum Availability Request to AFC server

a. AP sends a Spectrum Inquiry Request to the AFC system using the following parameters:

  • The AFC token
    • The GPS location (latitude, longitude, altitude)

b. AFC server responds with the following:

  • Permitted frequency channels
  • Allowed power levels (EIRP)
    • Spectrum grant validity period

6. AP activates 6 GHz radio based on AFC response

a. The AP configures its 6 GHz radio using the AFC response and starts operation.
b. Once AFC operation has started AP does not allow any static channels or static power setting

7. Periodic Spectrum Validity Check

a. The AFC server provides an expiry time (usually 22–24 hours).
b. AP monitors expiry and renews the spectrum grant before it expires.
c. If the spectrum grant changes, AP reconfigures channels/power; if unchanged, operation continu

8. Reboot or Failure Scenarios

a. On reboot, AP uses the existing shared secret and token if still valid.
b. If not valid, the AP repeats the registration and inquiry process.

c. Any intermediate failures use cached valid data until expiry.

Cambium Networks XE5-8 - Reboot or Failure Scenarios - 1

Note

The AP must be operating with IPv4 address. The Qualcomm AFC server currently does fully support IPv6 addresses.

AFC information in dashboard

Below is the AFC information shown in the XE3-4TN AP device dashboard from cnMaestro Cloud.

Cambium Networks XE5-8 - AFC information in dashboard - 1

Note

Altitude is in meters.

AFC Information

StatusSuccess
TokenObtained
Last Updated25 Aug 2025, 02:51 PM
LocationLong: , Lat:
Expiry26 Aug 2025, 02:19 AM
Version1.4
DescriptionSuccess
Allowed Channels (EIRP)1 (36), 5 (36), 9 (36), 13 (36), 17 (36), 21 (36), 25 (36), 29 (36), 33 (36), 37 (36), 41 (36), 45 (36), 49 (36), 53 (36), 57 (36), 61 (36), 65 (36), 69 (36), 73 (36), 77 (36), 81 (36), 85 (36), 89 (36), 93 (36), 117 (36), 121 (36), 125 (36), 129 (36), 133 (36), 137 (36), 141 (36), 145 (36), 149 (36), 153 (36), 157 (36), 161 (36), 165 (36), 169 (36), 173 (36), 177 (36), 181 (36) Allowed in AP group
Possible Channels1, 5, 9, 13, 17, 21, 25, 29, 33, 37, 41, 45, 49, 53, 57, 61, 65, 69, 73, 77, 81, 85, 89, 93, 117, 121, 125, 129, 133, 137, 141, 145, 149, 153, 157, 161, 165, 169, 173, 177, 181
GPS Information
Fix Type3D
GNSSGPS (United States)
Satellites (Used/Discovered)10 / 19
Location
Axis (Major/Minor)9 / 9
Altitude260
Altitude TypeAMSL
Vertical Uncertainty23
Timestamp25 Aug 2025, 02:34 PM

GPS configuration CLIs

The APs must be configured with placement as outdoor. By default, GPS is enabled on the APs additional GPS-specific configuration is required. Cambium recommends configuring GPS parameters to t default values. Following is the list of CLI commands for configuring GPS on APs:

<XE3-4TN-AP>(config)#gps
<XE3-4TN-AP>(config-gps)#shutdown
<XE3-4TN-AP>(config-gps)#success-interval <interval in seconds>
<XE3-4TN-AP>(config-gps)#failure-interval <interval in seconds>
<XE3-4TN-AP>(config-gps)#max-accuracy <in meters> 

Following are the default values of the above parameters:

• GPS is enabled by default
- Success interval—300 seconds
- Failure interval—30 seconds
• Max accuracy—100 meters

Cambium Networks XE5-8 - GPS configuration CLIs - 1

Note

If the AP reads the location information successfully then we will read the GPS data in success interval and default value is 600 seconds.

However, if location is not read successfully, then the AP will read the GPS data in n seconds.

AFC Troubleshooting

Verify GPS information received by the AP

From cnMaestro device dashboard verify that GPS information is populated. If it is not populated, v using the remote CLI option.

If GPS information is not displayed, verify that the AP's GPS antenna is securely connected and h unobstructed view of the sky.

WiFi > USA-XE34TN-GPS2 Dashboard Notifications Configuration Details Performance Software Update Tools Clients Mesh Peers WLANs Assists X Status Debug Remote CLI Packet Capture Network Connectivity Wi-Fi Analyzer Flash LEDs Command Type CLI command Run Output Complete Device > show gps-info Fix Type : 30 GNSS : GPS (United States) Satellites Used/Discovered : 18/19 Latitude/Longitude : 42.072091,-88.127929 Major/Minor axis : 9/9 Orientation : 0 Height : 260 m Height Type : AMSL Vertical Uncertainty : 23 Timestamp : 25-88-2025 14:34:25

Verify AFC server connection status and information

From cnMaestro device dashboard verify that AFC server information is populated. If it is not popular to verify using the remote CLI option.

If the AP is not receiving any information from the AFC server, ensure AP has internet connectivit

Wi-Fi > USA-XE34TN-GPS2 Deshipped Notifications Configuration Details Performance Software Update Tools Clients Mesh Pears WLANs Assist X Status Debug Remote CLI Packet Capture Network Connectivity Wi-Fi Analyzer Flash LEDs Command Type CLI command Run Output Complete device > show afc-info Status : SUCCESS SP-Status : AFC_SUCCESS Token : Obtained Location : 42.072078,-88.127934 AFC Server Response Data: Expiry : 20/5-68-20 02:19:54 TTL : 40/86 seconds Version : 1,4 Request ID : 12193542 Ruleset ID : US_47_CFR_PART_15_SUBPART_E Response Code : 0 Short Description : Success Regulatory Information 2MHz: channel(eirp) 1(36),5(36),9(36),13(36),17(36),21(36),25(36),29(36), 33(36),37(36),41(36),45(36),49(36),53(36),57(36),61(36), 65(36),69(36),73(36),77(36),81(36),85(36),89(36),93(36), 117(36),121(36),125(36),129(36),133(36),137(36),141(36),145(36), 149(36),153(36),157(36),161(36),165(36),169(36),173(36),177(36), 181(36) Regulatory Information 4MHz: center-channel(eirp) 3(36),11(36),10(36),27(36),35(36),43(36),51(36),59(36), 67(36),75(36),83(36),91(36),123(36),131(36),139(36),147(36), 155(36),163(36),171(36),179(36) Regulatory Information 8MHz: center-channel(eirp) 7(36),22(36),29(36),55(36),71(36),87(36),125(36),151(36), 167(36) Regulatory Information 16MHz: center-channel(eirp) 15(36),47(36),79(36),143(36)

AFC events

AP contacts the AFC server and turns on the radio within five to six minutes.

AFC events shown in the cnMaestro device events window.

■ Notify ■ Minor ■ Notify ■ Minor ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify ■ Notify

Glossary

Term Definition
AP AccessPoint Module. One module that distributes network or Internet services to modules.
API ApplicationApplication Program Interface
ARP AddressResolution Protocol. A protocol defined in RFC 826 to allow a network correlate a host IP address to the Ethernet address of the host.
BT Bluetooth
DFS SeeDynamic Frequency Selection
DHCP Dynamic Host Configuration Protocol defined in RFC 2131. The protocol that enables a device to be assigned a new IP address and TCP/IP parameters, including a default gateway, whenever the device reboots. Thus, DHCP reduces configuration time, conserves IP addresses, and allows modules to be moved to a different network within the system.
Ethernet ProtocolAny of several IEEE standards that define the contents of frames that are transferred from network element to another through Ethernet connections.
FCC Federal Communications Commission of the U.S.A.
GPS Global Positioning System. A network of satellites that provides absolute time to earth, which use the time signal to synchronize transmission and reception interference) and to provide reference for troubleshooting activities.
UI Userinterface.
HTTP Hypertext Transfer Protocol, used to make the Internet resources available on the World Wide Web.
HTTPS Hypertext Transfer Protocol Secure
HT HighThroughput
IP AddressThe 32-bit binary number identifies a network element by both network and Subnet Mask.
IPv4 Thetraditional version of Internet Protocol, defines 32-bit fields for data transmission.
LLDP LinkLayer Discovery Protocol
MAC AddressMedia Access Control address. The hardware address that the factory assigns to the mode for identification in the Data Link layer interface of the Open Systems Interconnection system. This address serves as an electronic serial number.
MIB Management Information Base. Space that allows a program (agent) in the network to relay information to a network monitor about the status of defined variables (objects).
MIR SeeMaximum Information Rate.
PPPoE Point to Point Protocol over Ethernet. Supported on SMs for operators who use PPPoE in other parts of their network operators who want to deploy PPPoE to realize per-subscribe authentication, metrics, and usage control.
Proxy ServerNetwork computer that isolates another from the Internet. The proxy server communicates the other computer, and sends replies to only the appropriate computer which has an II address that is not unique or not registered.
PoE Power over Ethernet.
SLA Service Level Agreement
VLAN Virtual local area network. An association of devices through software that contains broadcast traffic, as routers would, but in the switch-level protocol.
VPN A virtual private network for communication over a public network. One typical use is to connect remote employees, who are at home or in a different city, to their corporate r over the Internet. Any of several VPN implementation schemes are possible. SMs support L2TP over IPSec (Level 2 Tunneling Protocol over IP Security) VPNs and PPTP (Point to Tunneling Protocol) VPNs, regardless of whether the Network Address Translation (NAT) feature enabled.

Appendix

This appendix contains the following topics:

• Supported RADIUS Attributes
• Supported DFS channels
• Supported 6 GHz countries
• Priority order for parameters

• Best practices for wireless clients seamless roaming across APs

Supported RADIUS Attributes

This topic lists the following RADIUS override attributes that are supported on Enterprise Wi-Fi APs:

• WISPr VSAs (Vendor ID: 14122)
• Cambium VSAs (Vendor ID: 17713)
• Standard RADIUS attributes
• RADIUS attributes in authentication and accounting packets with WPA2-Enterprise security
• Supported CoA messages

WISPr VSAs (Vendor ID: 14122)

Table 70 lists the WISPr vendor-specific attributes (VSAs) supported on Enterprise Wi-Fi APs.

Table 70 WISPr VSAs

Attribute ValueAttribute Description Attribute TypeRADIUS Message Types Accounting Messages WPA2 /WPA3 - Enterprise Authentication SupportGuest Access Support
RequestResponse / ChallengeAcceptStartInterim Stop
2WISPr-Location-Namestring Yes-NA- NoYes Yes YesYesYes
7WISPr-Bandwidth-Max-UpintegerNoNoYesNoNoNoYes
8WISPr-Bandwidth-Max-DownintegerNoNoYesNoNoNoYes
9WISPr-Session-Terminate-TimestringNoNoYesNoNoNoYes

Table 71 lists the WISPr VSAs supported on Enterprise Wi-Fi APs with CoA support.

Table 71 WISPr VSAs with CoA

Attribute ValueAttribute DescriptionAttribute TypeRADIUS Message Types Accounting Messages CoA Support with Guest AccessCoA Support with WPA2 / - Enterprise Authentication
RequestResponse / ChallengeAcceptStartInterim Stop
2WISPr-Location-Namestring Yes-NA- NoYes Yes Yes-NA--NA-
7WISPr-Bandwidth-Max-UpintegerNoNoYesNoNoNoYes
8WISPr-Bandwidth-Max-DownintegerNoNoYesNoNoNoYes
9WISPr-Session-Terminate-TimestringNoNoYesNoNoNoYes

Cambium VSAs (Vendor ID: 17713)

Table 72 lists the Cambium Networks VSAs supported on Enterprise Wi-Fi APs.

Table 72 Cambium VSAs

Attribute ValueAttribute DescriptionAttribute TypeRADIUS Message TypesAccounting MessagesWPA2 / WPA3 - EnterpGuest Access Support
RequestResponse / ChallengeAcceptStartInterim Stop
151Cambium-Wi-Fi-Quota-UpintegerNoNoYesNoNoNo-NA-Yes
152Cambium-Wi-Fi-Quota-DownintegerNoNoYesNoNoNo-NA-Yes
155Cambium-Wi-Fi-Quota-TotalintegerNoNoYesNoNoNo-NA-Yes
Attribute ValueAttribute Description Attribute TypeRADIUS Message Types Accounting Messages WPA2 / Authentication SupportGuest Access Support
RequestResponse / ChallengeAcceptStart InInterim Stop
153Cambium-Wi-Fi-Quota-Up-Gigawordinteger64No No Yes No No No-NA-Yes
154Cambium-Wi-Fi-Quota-Down-Gigawordinteger64No No Yes No No No-NA-Yes
156Cambium-Wi-Fi-Quota-Total-Gigawordinteger64No No Yes No No No-NA-Yes
157Cambium-VLAN-Pool-IDstring NoNo Yes No No No Yes No
159Cambium-Traffic-Classes-AcctTLV
159.2Cambium-Acct-Input-Octetsinteger NoNo No No YesYes
159.3Cambium-Acct-Output-Octetsinteger NoNo No No YesYes
159.4Cambium-Acct-Input-Packetsinteger NoNo No No YesYes
159.5Cambium-Acct-Output-Packetsinteger NoNo No No YesYes

Table 73 lists the Cambium Networks VSAs supported on Enterprise Wi-Fi APs with CoA.

Table 73 Cambium VSAs with CoA

Attribute ValueAttribute DescriptionAttribute TypeRADIUSMessage TypesAccountingMessages CoASupport with Guest AccessCoA Support with WPA2 / WPA3 - Enterprise Authentication
RequestResponse / ChallengeAcceptStartInterim Stop
151Cambium-Wi-Fi-Quota-Upinteger NoNo YesNo No NoYes
152Cambium-Wi-Fi-Quota-Downinteger NoNo YesNo No NoYes
155Cambium-Wi-Fi-Quota-Totalinteger NoNo YesNo No NoYes
153Cambium-Wi-Fi-Quota-Up-Gigawordinteger64No No YesNo No NoYes
154Cambium-Wi-Fi-Quota-Down-Gigawordinteger64No No YesNo No NoYes
156Cambium-Wi-Fi-Quota-Total-Gigawordinteger64No No YesNo No NoYes
157Cambium-VLAN-Pool-IDstring NoNo YesNo No No
159Cambium-Traffic-Classes-AcctTLV
159.2Cambium-Acct-Input-Octetsinteger NoNo NoNo Yes Yes
159.3Cambium-Acct-Output-Octetsinteger NoNo NoNo Yes Yes
159.4Cambium-Acct-Input-Packetsinteger NoNo NoNo Yes Yes
159.5Cambium-Acct-Output-Packetsinteger NoNo NoNo Yes Yes

Standard RADIUS attributes

Table 74 lists the standard RADIUS attributes supported on Enterprise Wi-Fi APs.

Table 74 Standard RADIUS attributes

Attribute ValueAttribute DescriptionAttribute TypeRADIUS Message Types Accountingng Messages WPA2 /WPA3 - Enterprise Authentication SupportGuest Access Support
RequestResponse / ChallengeAcceptStartInterim Stop
11Filter-Id (text) - Group-IDtext No-NA- YesNo No No Yes
24StatestringYesYesNoYes-NA-
25Classstring No-NA- YesYes No No YesYes
27Session-TimeoutintegerNo -NA-Yes No No No YesYes
28Idle-TimeoutintegerNo -NA-Yes No No NoYes
64Tunnel-TypeenumNo -NA-Yes No No No YesYes
65Tunnel-Medium-TypeenumNo -NA-Yes No No No YesYes
81Tunnel-Private-Group-Idtext No-NA- YesNo No No YesYes
85Acct-Interim-IntervalintegerNo -NA-Yes No No No YesYes
DisconnectRADIUS packet
40Disconnect-Request-RADIUS packet-NA--NA--NA--NA--NA--NA--NA-
41Disconnect-ACK-RADIUS packet-NA- -NA--NA--NA--NA-
42Disconnect-NAK- RADIUSpacket-NA- -NA- -NA--NA--NA-
43CoA-Request- RADIUSpacket-NA- -NA- -NA--NA--NA-
44CoA-ACK- RADIUSpacket-NA- -NA- -NA--NA--NA-
45CoA-NAK- RADIUSpacket-NA- -NA- -NA--NA--NA-

Table 75 lists the standard RADIUS attributes supported on Enterprise Wi-Fi APs with CoA support.

Table 75 Standard RADIUS attributes with CoA

Attribute ValueAttribute DescriptionAttribute TypeRADIUS Message Types Accounting Messages CoA SupportSupport with Guest AccessCoA Support with WPA2 / - Enterprise Authentication
RequestResponse / ChallengeAcceptStartInterim Stop
11Filter-Id (text) - Group-IDtextNo-NA-YesNoNoNoYesYes
24StatestringYesYesNoYes
25ClassstringNo-NA-YesYesNoNo-NA--NA-
27Session-TimeoutintegerNo-NA-YesNoNoNo-NA--NA-
28Idle-TimeoutintegerNo-NA-YesNoNoNo-NA--NA-
64Tunnel-TypeenumNo-NA-YesNoNoNo-NA--NA-
Attribute ValueAttribute DescriptionAttribute TypeRADIUS Message Types Accounting Messages CoA Support with Guest AccessCoA Support with WPA2 / - Enterprise Authentication
RequestResponse / ChallengeAcceptStartInterim Stop
65Tunnel-Medium-Typeenum No-NA- YesNo No No-NA- -NA-
81Tunnel-Private-Group-Idtext No-NA- YesNo No NoNo Yes
85Acct-Interim-Intervalinteger No-NA- YesNo No No
DisconnectRADIUS packet
40Disconnect-Request-RADIUS packet-NA--NA--NA--NA--NA-Yes
41Disconnect-ACK-RADIUS packet-NA--NA--NA--NA--NA-Yes
42Disconnect-NAK-RADIUS packet-NA--NA--NA--NA--NA-Yes
43CoA-Request-RADIUS packet-NA--NA--NA--NA--NA-Yes
44CoA-ACK-RADIUS packet-NA--NA--NA--NA--NA-Yes
45CoA-NAK-RADIUS packet-NA--NA--NA--NA--NA-Yes

RADIUS attributes in authentication and accounting packets with WPA2-Enterprise security

Table 76 lists the RADIUS attributes supported in authentication and accounting packets with WPA2-Enterprise security.

Table 76 RADIUS attributes in authentication and accounting packets with WPA2-Enterprise security

Attribute ValueAttribute DescriptionAttribute TypeAccess-RequestAccess-ChallengeAccess-AcceptAccounting-StartAccounting-InterimAccounting-Stop
1User-Namestring YesNo Yes YesYes Yes
2User-Passwordstring YesNo No No NoNo No
4NAS-IP-Addressipv4addr YesNo No YesYes Yes
5NAS-Portinteger YesNo No YesYes Yes
6Service-Typeenum YesNo No YesYes Yes
8Framed-IP-Addressipv4addr NoNo No YesYes Yes
12Framed-MTUinteger YesNo No YesYes Yes
24Statestring YesYes No NoNo No
25Classstring No NoYes YesYes Yes
27Session-Timeoutinteger NoNo Yes NoNo No
28Idle-Timeoutinteger NoNo Yes NoNo No
30Called-Station-Idstring YesNo No YesYes Yes
31Calling-Station-IdtextYes No NoYes Yes Yes
32NAS-Identifierstring YesNo No YesYes Yes
40Acct-Status-Typeenum No NoNo No YesYes Yes
41Acct-Delay-Timeinteger NoNo No YesYes Yes
42Acct-Input-Octetsinteger NoNo No NoYes Yes
43Acct-Output-Octetsinteger NoNo No NoYes Yes
44Acct-Session-Idtext Yes NoNo Yes YesYes
45Acct-Authenticenum NoNo No YesYes Yes
46Acct-Session-Timeinteger NoNo No NoYes Yes
49Acct-Terminate-Causeenum NoNo No NoYes
50Acct-Multi-Session-Idtext Yes (Empty)No NoYes Yes Yes
52Acct-Input-Gigawordsinteger NoNo No NoNo No
53Acct-Output-Gigawordsinteger NoNo No NoNo No
55Event-Timestamptime No NoNo Yes YesYes
61NAS-Port-Typeinteger YesNo No YesYes Yes
77Connect-Infotext Yes NoNo Yes YesYes
79EAP-Messageconcat YesYes YesNo No No
80Message-AuthenticatorstringYes Yes YesNo No No
85Acct-Interim-Intervalinteger NoNo Yes NoNo No
87NAS-Port-Idtext Yes NoNo Yes YesYes

Supported CoA messages

Table 77 lists the supported CoA messages.

Table 77 CoA messages

CoA Message Supportedby MAB (Wired Clients)Supported by the AP
Disconnect clientYesYes
Update VLANYesYes
Session TimeoutNoYes
Accounting IntervalYesYes
Quota LimitNoYes

Cambium Networks XE5-8 - Supported CoA messages - 1

Note

Following are the mandatory parameters to be included in the CoA message:

  • When sent through cnMaestro—User-Name, Calling-Station-Id, and Session ID
  • When sent directly through the AP—User-Name, Calling-Station-Id, and NAS-Identifier

Supported DFS channels

Table 78 lists the DFS channel support for various platforms in conformance with FCC standards.

Table 78 DFS channel support for FCC

AP Model5250-5350 MHz (U-NII-2A)5470-5725 MHz (U-NII-2C)5725-5850 MHz (U-NII-3)
XE3-4TNYes Yes Yes
XV2-22HYes Yes Yes
XV2-21XYes Yes Yes
XV2-23TYes Yes Yes
XE3-4 Yes Yes Yes
XE5-8 Yes Yes Yes
XV2-2 Yes Yes Yes
XV3-8 Yes Yes Yes
XV2-2T0 Yes Yes Yes
XV2-2T1 Yes Yes Yes
X7-35X

Table 79 lists the DFS channel support for various platforms in conformance with IC standards.

Table 79 DFS channel support for IC

AP Model5250-5350 MHz (U-NII-2A)5470-5725 MHz (U-NII-2C)5725-5850 MHz (U-NII-3)
XE3-4TNYes Yes Yes
XV2-22HYes Yes Yes
XV2-21XYes Yes Yes
XV2-23TYes Yes Yes
XE3-4 Yes Yes Yes
XE5-8 Yes Yes Yes
XV2-2 Yes Yes Yes
XV3-8 Yes Yes Yes
XV2-2T0 Yes Yes Yes
XV2-2T1 Yes Yes Yes
X7-35X

Table 80 lists the DFS channel support for various platforms in conformance with CE standards.

Table 80 DFS channel support for CE

AP Model5250-5350 MHz (U-NII-2A)5470-5725 MHz (U-NII-2C)5725-5850 MHz (U-NII-3)
XE3-4TNYes Yes Yes
XV2-22HYes Yes Yes
XV2-21XYes Yes Yes
XV2-23TYes Yes Yes
XE3-4 Yes Yes Yes
XE5-8 Yes Yes Yes
XV2-2 Yes Yes No
XV3-8 No Yes No
XV2-2T0 Yes Yes Yes
XV2-2T1 Yes Yes Yes
X7-35X

Supported 6 GHz countries

Table 81 lists the countries where 6 GHz band is available and the frequencies supported.

Cambium Networks XE5-8 - Supported 6 GHz countries - 1

Note

Availability of these channels is subjected to respective country regulations.

6 GHz frequency is supported only on the following Enterprise Wi-Fi APs:

- X7-35X

- XE3-4

- XE3-4TN

Table 81 List of countries where 6 GHz band is supported

Country X7-35X XE3-4 XE5-8
Australia (AU)5945-6425 MHz1-93 5945-6425 MHz1-93 1-6165-93
Brazil (BR)5945-7125MHz1-233 5945-7125 MHz1-233 1-93129-233
Canada (CA)5945-7125 MHz1-233 5945-7125 MHz1-233 1-9397-233
Colombia (CO)5945-7125 MHz1-233 5945-7125 MHz1-233 1-93129-233
France (FR)5945-6425MHz1-93 5945-6425 MHz1-93 1-6165-93
Germany (DE)5945-6425 MHz1-93 5945-6425 MHz1-93 1-6165-93
Ireland (IE)5945-6425MHz1-93 5945-6425 MHz1-93 1-6165-93
Italy (IT)5945-6425MHz1-93 5945-6425 MHz1-93 1-6165-93
Jordan (JO)5945-6425 MHz1-93 5945-6425 MHz1-93 1-6165-93
South Korea (KR)5945-7125 MHz1-233 5945-7125 MHz1-233 1-9397-233
Netherlands (NL)5945-6425 MHz1-93 5945-6425 MHz1-93 1-6165-93
New Zealand (NZ)5945-6425 MHz1-93 5945-6425 MHz1-93 1-6165-93
Country X7-35X XE3-4 XE5-8
Frequencies SupportedChannels SupportedFrequencies SupportedChannels SupportedFrequencies SupportedChannels Supported (No Channel Distribution)Channels Supported (With Channel Distribution Enabled)
Radio 2Radio 3
South Africa (ZA)5945-6425 MHz1-93 5945-6425 MHz1-93 1-6165-93
Spain (ES)5945-6425MHz1-93 5945-6425 MHz1-93 1-6165-93
Sweden (SE)5945-6425 MHz1-93 5945-6425 MHz1-93 1-6165-93
United Kingdom (GB)5945-6425 MHz1-93 5945-6425 MHz1-93 1-6165-93
United States (US)5945-7125 MHz1-233 5945-7125 MHz1-233 1-93129-233

Priority order for parameters

This section provides information on the order of priority for the following parameters:

- Session timeout and inactivity timeout—Following priority is considered when configuring session timeout and inactivity timeout:

a. Configured from the RADIUS server
b. Configured from the AP

Cambium Networks XE5-8 - Priority order for parameters - 1

Note

  • Inactivity timeout is triggered when there is no data packets from the client to
  • A five minute static idle time is configured from the driver, which is triggered with there are no wireless packets from the client.

- VLAN assignment—Following priority is considered when assigning VLANs to clients:

a. RADIUS dynamic VLAN for guest access clients
b. RADIUS dynamic VLAN (Filter-ID/RADIUS-ID)
c. RADIUS dynamic VLAN
d. RADIUS-based ePSK
e. RADIUS-based dynamic VLAN Pool
f. Local ePSK VLAN setting
g. VLAN pool (Static)
h. SSID/WLAN profile VLAN

- User group filter—Following priority is considered for assigning policy:

a. Global policy
b. User Group policy
c. Device Group policy
d. SSID/WLAN policy

Reasons for AP restarting

The AP restarts only when the Software Defined Radios configurations are modified, such as:

- Modify radio band mode from 5 GHz to 6 GHz and vice versa

- Splitting the radio from 8x8 into 4x4 on XV3-8 (on the Radio 2) and XE5-8 APs (on the Ra

Software Defined Radios
ModelRadio 1Radio 2Radio 3Radio 4Radio 5
XV3-82.4 GHz5 GHz (Split 4x4)5 GHzN/AN/A
XE3-4/XE3-4TN2.4 GHz5 GHz6 GHzN/AN/A
XE5-82.4 GHz5 GHz6 GHz5 GHz (Split 4x4)5 GHz

Best practices for wireless clients seamless roaming acre APs

Cambium Networks XE5-8 - Best practices for wireless clients seamless roaming acre APs - 1

Note

- Inactivity timeout is triggered when there is no data packets from the client to the

- A five minute static idle time is configured from the driver, which is triggered when are no wireless packets from the client.

This appendix explains the recommended configuration for Cambium Networks APs and external network to facilitate a seamless roaming across the APs for the wireless clients. Additionally, this appendix is the recommended network best practices for minimizing broadcast and multicast packets processing.

This appendix contains the following topics:

• External network recommendation

• AP WLAN profile configuration recommendations

• AP group configuration recommendations

External network recommendations

The Cambium APs work in the distributed architecture mode and it is important to facilitate AP-to-A communication for the wireless clients seamless roaming. The APs uses the Cambium propriety XRP protocol to exchange clients information with the neighboring APs.

Following are the recommendations:

- The intermediate network switches, to which the APs are connected, must not block the following messages:

XRP message packet information

Source MAC—APs ethernet MAC

Destination MAC—Ethernet broadcast

Source IP Address—APs exit interface IP address

Destination IP Address—255.255.255.255 Broadcast IP address
- Protocol—UDP with a random source port and a fixed destination port

A sample pcap capture of the XRP message is displayed in Figure 106.

Figure 106 Sample XRP message
Frame 1942: 204 bytes on screen [1630/845, 30x76] bytes uploaded [0033/541] Ethernet, S, S, C: DocumentName: 3E_24 (30x76.27.37.26.26), D:\ Broadcast (test version 1) Destination (Host: 0x76) Source: C: DocumentName: 3E_24 (30x76.27.37.26.26) Type: P: Document Internet Protocol Version 4, S: 192.188.11.111, D: 235.255.255.255 0x88... Version 4 ... 0x88... Header Length: 20 bytes (3) Differentiated Service Help (port) [DSP: 250, 35N, 35N test-8/7] Total length: 250 Identification: Data Port [99/321] 0x88... Flags Slot, Slot fragment ... 0x88-0000-0000 ... fragment offset (i) Time to Use Day Protocol: UP [17] Header Checkbox (OKB) (validation disabled) [header checkbox status: Unverified] Source Address: 202.188.11.221- Derivatation address: 202.188.11.221> User Telegram Protocol, Sr: Post: 80390, Del Post: 22610 Source Port: 69930 Derivatation Port: 22610 Length: 170 Checkbox (Enbase) [Unverified] [Checkbox status: Unverified] Stream index [5] Timingcode Time since first frame: 129.999999993 (seconds) Time since previous frame: 60.0000064(4) second. UPF payload [36] bytes Data (U4 label) Data (Intricate): 0x76 at 5x76 - 5x76 @ 5x76 @ 5x76 @ 5x76 @ 5x76 @ 5x76 @ 5x76 @ 5x76 @ 5x76 @ 5x76 @ 5x76 @ 5x76 @ 5x76 @ 5x76 @ 5x76 @ 5x76 @ 5x76 @ 5x

  • APs send the XRP messages on the ethernet port's native VLAN.
  • All the APs must be part of the same native VLAN.
    • Make sure that the APs have the L3 interface for the native VLAN with a valid IP address.

AP WLAN profile configuration recommendations

If the WLAN profile is configured with WPA2 and WPA3 security, it is recommended to enable the

• 802.11r fast roaming
- OKC

Cambium Networks XE5-8 - AP WLAN profile configuration recommendations - 1

Note

A few clients use 802.11k and 802.11v protocols for fast roaming. We can enable th

Figure 107 Enabling OKC and 802.11r
WLANs > NORMAL BROWSING Configuration Devices WLAN AAA Servers Guest Access Access Control Passpoint ePSK Band Steering Delete Steer clients across all Bands. Proxy ARP Respond to AIP requests automatically on behalf of clients Proxy ND Respond to IPv6 Neighbor Discovery (ND) requests automatically on behalf of clients Unicast DHCP Convert DHCP-OFFER and DHCP-ACK to unicast before forwarding to clients Insert DHCP Option 82 Enable DHCP Option 82 Option82 Circuit ID 8550 Option82 Remote ID ARMAC Tunnel Mode Enable tunneling at WLAN traffic over configured tunnel Fast Roaming Protocol Del: 802.7m Configure roaming protocols (not applicable when authentication type is Open) Over the OS Re-association Timeout: 20 Number of seconds (1-100f) RIM (802.1k) Enable Radio Resource Measurements (802.1k) BC2.7k Secure 802.7k OSS Transition Management PMF (802.7m) Optional

- Enable client isolation with the Network Wide option to prevent clients communicating with other clients on the same L2 network.

Figure 108 Enabling Client Isolation
WLANs > Default Enterprise Configuration Devices WLAN AAA Services Guest Access Access Control Passpolt ePsk Basic Settings SSID Enable SSID* orPsk The SSID of this RILAN (up to 32 characters) Mesh Off Mesh Base/Client/Recovery mode VLAN 1 Default VLAN assigned to clients on this WLAN (1-4094) Security WPA2 Pre Shared Keys Set authentication and encryption type Passphrase* Show WPA2 Pre-shared security passphrase or key (must contain 0 to 53 osci or 64 hex digits) Change your password, do not use default passwords! Band 2.4 GHz 5 GHz 6 GHz Define radio types (2.4 GHz, 5 GHz, 6 GHz) on which this WLAN should be supported Client Isolation Network Wide When selected, it prevents wireless clients connected to the same AP or different APs from communicating with each other which are in the LPGA VLAP, CIRPS are allowed to communicate to gateway mac address automatically and use mac addresses listed in below MAC address table Client Isolation MAC List e.g. wccwccxccxn Add Import.civ Save

Cambium Networks XE5-8 - Note - 3

From AP version 6.6.0.2 onwards, the AP drops the ARP packets when the client is feature is enabled. To enable this in APs running firmware version lesser than 6.6.0.: execute the client-isolation dynamic drop-arp CLI command from the AP group User-Defined Overrides section.

Figure 109 Enabling Client Isolation in User-Defined Overrides
AP Groups Dashboard Notifications Configuration Statistics Reports X Devices Clients Mesh Peers Basic User-Defined Overrides Management Advanced configuration settings entered below will be applied on top of the AP Group set the previous screens. If there are conflicts, the below settings will take precedence. The for UI or the "View Device Configuration" link in the device level configuration page. Radio Variables and Macros Network Settings entered are not validated or error-checked (However, dollar (), period () or sp 64 characters long), and they may overwrite configuration made in previous screens, so pla Group is valid and safe to use. Security Access Control Services wireless wifi client-isolation dynamic drop-erp User-Defined Overrides

AP group configuration recommendations

- In large public Wi-Fi and campus deployments, it is common to see large number of network protocols, such as mDNS, LLMNR, SSDP and other service discovery packets coming from the v clients.

Disable these packets using Access Control Policy.

  • If IPv6 is not required, disable IPv6 packets from the wireless clients using Access Control Policy.
    • Use Air Cleaner Rules to:

• prevent unauthorized rogue DHCP server from wireless clients
• prevent unwanted DHCP client packets from wired network side
- drop L2 broadcast packets
- drop IPv4 and IPv6 multicast packets
drop ARP discovery packets from one SSID to another SSID interface
- disable mDNS packets in the default Air Cleaner rules

Cambium Networks XE5-8 - AP group configuration recommendations - 1

Note

Allow the mDNS packet to enable bonjour discovery service to work.

• Sample AP group policy with Air Cleaner Rules.

Figure 110 Sample AP group policy with Air Cleaner Rules
Air Cleaner Rules Apply Filter(s) Name Status Action Direction Source ... Source Mask Destination ... Destination Mask Protocol Somer Port Destination Port Air-cleaner-Arp1 Enabled ●Deny In any FF FF FF FF FF FF any FF FF FF FF FF FF ARP any any Air-cleaner-Dhcp1 Enabled ●Deny Out any FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF UDP any 67 Air-cleaner-Dhcp2 Enabled ●Deny In any FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF UDP any 68 Air-cleaner-Bcst1 Enabled ●Allow Any any FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF ARP any any Air-cleaner-Bcst2 Enabled ●Allow Any any FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF UDP any 67 Air-cleaner-Bcst3 Enabled ●Allow Any any FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF/UDP any 68 Air-cleaner-Bcst4 Enabled ●Allow Any any FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF UDP any 22610 Air-cleaner-Bcst5 Enabled ●Deny Any any FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF FF ANY any any Air-cleaner-mDNS1 Enabled ●Allow Any any FF FF FF FF PP FFS 01:00:5E:00:00 FB FF FP FFS FFS FFS ANY any any Air-cleaner-Mcst1 Enabled ●Deny Any any FF FP FFS FFS FFS multifast FFS FP FFS FFS FFS ANY any any MAC Filtering Rules IP and Application Filtering Rules Apply Filter(s) Name Status atop Action Type Application / Category Protocol Sour... Source IP Mask Destination ... Destination IP Mask BLOCK DROPBOX DISCOVERY Enabled Ceny Layer3-filter - UDP arrays any any 255.255.255.255 arrays BLOCK LLMNR Enabled Ceny Layer3-filter - UDP arrays any any 224.8.0.252 arrays BLOCK SSOP Enabled Ceny Layer3-filter - UDP arrays any any 239.255.255.250 arrays

Sample user-defined rule for blocking IPv6 traffic and allowing the rest of the traffic.

!
filter global-filter
filter precedence 14
enable
layer3-filter deny proto6 any any any any any any //BLOCK IPv6 TRAFFIC
exit
filter precedence 15
enable
layer3-filter permit ip any/any any/any any //ALLOW TRAFFIC
exit
! 

Cambium Networks

Cambium Networks delivers wireless communications that work for businesses, communities, and cities worldwide. Millions of our radios are deployed to connect people, places, and things with a unified fabric that spans multiple standards and frequencies of fixed wireless and Wi-Fi, all managed central the cloud. Our multi-gigabit wireless fabric offers a compelling value proposition over traditional fiber alternative wireless solutions. We work with our Cambium certified Connected Partners to deliver purp built networks for service provider, enterprise, industrial, and government connectivity solutions in urban suburban, and rural environments, with wireless that just works.

Support website https://support.cambiumnetworks.com
Support enquiries
Technical training https://learning.cambiumnetworks.com/learn
Main website https://www.cambiumnetworks.com
Sales enquiries solutions@cambiumnetworks.com
Warranty https://www.cambiumnetworks.com/support/standard-warranty/
Telephone number list https://www.cambiumnetworks.com/contact-us/
User Guides https://www.cambiumnetworks.com/guides
Address Cambium Networks Limited,Unit B2, Linhay Business Park, Eastern Road, Ashburton,Devon, TQ13 7UPUnited Kingdom

Cambium Networks XE5-8 - Cambium Networks - 1

Cambium Networks™

www.cambiumnetworks.com

Cambium Networks and the stylized circular logo are trademarks of Cambium Networks, Ltd. All other trademarks are the property of their respective owners.

Copyright © 2025 Cambium Networks, Ltd. All rights reserved.

Table of contents Click a title to access it
Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : Cambium Networks

Model : XE5-8

Category : Access Point