LED 26H-3675-S - Television ITT - Free user manual and instructions
Find the device manual for free LED 26H-3675-S ITT in PDF.
| Product Type | LED Television |
| Brand | ITT |
| Model | LED 26H-3675-S |
| Screen Size | 22 inches (16:9 aspect ratio) |
| Dimensions (with stand) | 134 x 530 x 376 mm (D x L x H) |
| Dimensions (without stand) | 35 x 530 x 340 mm (D x L x H) |
| Weight (with stand) | 4.45 kg |
| Weight (without stand) | 4.25 kg |
| Power Supply | 220-240 V AC, 50 Hz |
| Power Consumption (max) | 45 W |
| Audio Output Power | 2 x 2.5 W RMS (10% THD) |
| Tuner | DVB-T/C/S-S2 (MPEG2/MPEG4 HD) |
| Number of Preset Channels | 10000 |
| Inputs | HDMI, SCART, VGA (PC), USB, CI, Side AV, Headphone |
| Remote Control | Yes (batteries: 2 x AAA included) |
| Special Features | Sleep timer, child lock, teletext, EPG, media playback via USB, PC input |
| Cleaning Instructions | Disconnect power; use a soft, dry cloth only |
| Safety Precautions | Keep ventilation space of at least 10 cm; avoid moisture and heat sources |
Frequently Asked Questions - LED 26H-3675-S ITT
User questions about LED 26H-3675-S ITT
0 question about this device. Answer the ones you know or ask your own.
Ask a new question about this device
Download the instructions for your Television in PDF format for free! Find your manual LED 26H-3675-S - ITT and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. LED 26H-3675-S by ITT.
USER MANUAL LED 26H-3675-S ITT
natural_image
Front view of a black flat-screen TV displaying the 'TV' logo on screen (no additional text or symbols visible)Vorwort
natural_image
Diagram of a computer monitor and its internal layout showing internal components (no text or symbols)natural_image
Two views of a black electronic device casing, one open and one closed, showing internal components (no text or symbols visible)PAL/SECAM B/G D/K K' I/I' L/L'
DIGITALEMPFANG
DVB-T, MPEG2
DVB-T MPEG4 HD
Safety Precautions .... 1
Preparation....1
Intended Use 1
Power source....1
Positioning the TV....1
Power cord and plug....2
Moisture and Water 2
Ventilation....2
Heat sources and Flames....2
Headphone Volume 2
Wall Mounting (optional) 2
LCD Screen 2
Cleaning....2
Environmental Information 2
Accessories included....3
TV - Features 3
Viewing the TV 3
TV Control Switch & Operation.... 3
Viewing remote control 4
Installing the Batteries to the Remote....6
Connect Power & Antenna/Cable/Satellite 6
Switching On/Off....6
Switching the TV On 6
Switching the TV Off 6
First Time Installation....6
Aerial Installation....7
Cable Installation....7
Satellite Installation....7
Media Playback via USB Input 8
Media Browser Menu....8
Changing Image Size: Picture Formats......8
Using the Channel List 8
Sorting Channel List 8
Menu Features and Functions....9
Menu Features and Functions....10
Menu Features and Functions....11
Electronic Programme Guide (EPG) 12
Teletext....12
Digital Teletext (for UK only).... 12
Software Upgrade.... 13
Troubleshooting & Tips....13
Image persistence - ghosting.... 13
No power 13
Poor picture 13
No picture 13
No sound 14
Remote control - does not operate 14
Input sources - can not be selected....14
PC Typical Display Modes 14
Specifications 15
Supported File Formats for USB Mode 15
Safety Precautions
Please read these instructions fully before installing or operating.
Preparation
Place the device on a solid even surface. For ventilation, leave a free space of at least 10 cm all around the set. To prevent any fault and unsafe situations, do not place any objects on top of the set. Use this device in moderate climates. Operation temperature and operation humidity: 5°C up to 45°C, 85% rel. humidity max. (not blocking ventilation openings).
Intended Use
This device is used to receive and display TV programmes. The different connection options make an additional expansion of the reception and display sources possible (various external devices). This device is only suitable for the operation in dry interiors. This appliance is intended solely for private domestic use and may not be used for industrial and commercial purposes. We exclude liability in principle, if the device is not used as intended, or unauthorized modifications have been made. To operate your LED TV in extreme ambient conditions may cause the damage of the device.
WARNING: Never let people (including children) with physical, sensory or mental abilities or lack of experience and / or knowledge unsupervised use electrical device!
Children may not recognize dangers right! The swallowing of batteries can be fatal. Keep batteries always out of reach of small children. If a battery is swallowed, immediately seek medical attention. Keep the packaging films out of reach of children. Risk of suffocation.
Power source
- The TV should be operated only from a 220-240 V AC, 50 Hz outlet.
- Warning: Do not leave your TV in standby or operating mode when you leave your house.
Positioning the TV
- For ventilation, please leave a clear space of at least 10cm all around the TV.
- Do not block the ventilation openings.
- Do not place the TV on sloping or unstable surfaces, the TV may tip over.
- To prevent damage to the TV, do not place any objects on top of the TV.
- Only use the TV in moderate climates.
Power cord and plug
- The power cord plug should be easily accessible. In case of storms and lightning, when going on holiday, or when the TV is not used for a long period of time disconnect the power cord from the mains power socket.
- The mains plug is used to disconnect TV set from the mains and therefore it must remain readily operable.
- Do not place the TV, furniture, etc. on the power cord or pinch the cord.
- Handle the power cord by the plug, do not unplug the TV by pulling the power cord.
- Never touch the power cord/plug with wet hands as this could cause a short circuit or electric shock.
- Never make a knot in the power cord or tie it with other cords.
- Power cords should be placed in such a way that they are not likely to be stepped on or driven over.
- A damaged power cord/plug can cause fire or give you an electric shock. When damaged it must be replaced, this should only be done by qualified personnel.
Moisture and Water
- Do not use this TV in a humid or damp place (avoid bathrooms, the sink in the kitchen, and near the washing machine).
- Do not expose this TV to rain or water, as this may be dangerous.
- Do not place objects filled with liquids, such as flower vases, on top of the TV. Avoid from dripping or splashing.
- If any solid object or liquid falls into the cabinet, unplug the TV and have it checked by qualified personnel before operating it any further.
Ventilation
- The slots and openings on the TV set are intended for ventilation and to ensure reliable operation.
- To prevent overheating, these openings must not be blocked or covered in anyway.
Heat sources and Flames
- Do not expose the TV to direct sunlight or other heat sources.
- The TV should not be placed near to open flames and sources of intense heat such as an electric heater.
- Ensure that no open flame sources, such as lighted candles, are placed on top of the TV.


Headphone Volume
- Excessive sound pressure from earphones and headphones can cause hearing loss, please take care.

Wall Mounting (optional)
- To prevent injury, this TV must be securely attached to the wall in accordance with the installation instructions (if the option is available).
LCD Screen
- Occasionally, a few non-active pixels may appear on the screen as a fixed blue, green or red point. Please note that this does not affect the performance of your product.
• Take care not to scratch the screen with fingernails or other hard objects.
Cleaning
- Before cleaning, unplug the TV from the wall socket.
- Do not use liquid or aerosol cleaners. Only use a soft, dry cloth.
Environmental Information
This television is designed to consume less energy to save environment. You not only help to save the environment but also you can save money by reducing electricity bills thanks to the energy efficiency feature of this TV. To reduce energy consumption, you should take the following steps:
You can use Power Save Mode setting, located in the Picture menu. If you set Power Save Mode as On, the TV will switch to energy-saving mode and luminance level of TV set will be decreased to optimum level. Note that some picture settings will be unavailable to be changed when the TV is in Power Save Mode.
Power Save Mode

When the TV is not in use, please switch off or disconnect the TV from the mains plug. This will also reduce energy consumption.
Disconnect power when going away for longer time. It is highly recommended to activate Power Save Mode setting to reduce your annual power consumption. And also it is recommended to disconnect the TV from the mains plug to save energy more when you do not use.
Please helps us to save environment by following these steps.
Repair Information
Please refer all servicing to qualified personnel. Only qualified personnel must repair the TV. Please contact your local dealer, where you have purchased this TV for further information.
Accessories included
Remote Control
Batteries: 2 x AAA
Instruction Book
Side AV Connection Cable
TV - Features
- Fully integrated digital/cable/satellite TV (DVB-T/C/S-S2).
• HDMI connectors for digital video and audio.
- USB input.
• 10000 programmes.
- OSD menu system.
- Scart socket for external devices.
- Stereo sound system.
- Teletext, fastext, TOP text.
• Headphone connection.
• Automatic programming system.
- Forward or backward manual tuning.
• Automatic power down after up to six hours.
- Sleep timer.
- Child lock.
• Automatic sound mute when no transmission.
- NTSC playback.
• AVL (Automatic Volume Limiting).
- PLL (Frequency Search).
- PC input.
- Plug&Play for Windows 98, ME, 2000, XP, Vista, Windows 7.
• Game Mode (optional).
• Picture off function.
Viewing the TV

natural_image
Technical line drawing of an open computer monitor and its internal components (no text or symbols)TV Control Switch & Operation

-
Up direction
-
Down direction
-
Programme/Volume / AV / Standby-On selection switch
You can move the switch, upward or downward to change the volume. If you want to change channels, press the middle of the switch once (Position 3) and then move upward or downward. If you press the middle of the switch once more, source OSD will be displayed. To select desired source, move the switch upward or downward and release. If you press the middle of the switch and hold about a few seconds, the TV will switch to standby mode. Main menu OSD cannot be displayed via the control button.
Operation with the Remote Control
Press MENU button on your remote control to display main menu screen. Use Left or Right button to select a menu tab and press OK to enter. Use Left / Right / Up / Down to select or set an item. Press RETURN/BACK or MENU button to quit a menu screen.
Input Selection
Once you have connected external systems to your TV, you can switch to different input sources. Press SOURCE button on your remote control consecutively to select the different sources.
Changing Channels and Volume
You can change the channel and adjust the volume by using the V+/- and P+/- buttons on the remote.
Viewing remote control
- No function
- Play (in Media Browser mode)
- No function
- Fast rewind (in Media Browser mode)
- No function
- Mono/Stereo - Dual I-II / Current Language (*)
- Image size
- Green button
- Red button
- Numeric buttons
- Teletext / Mix
- Info / Reveal (in TXT mode)
- Programme Down - Page up / Programme Up - Page down
- Mute
- Favourite mode selection
- Back to previous menu / Index page (in TXT mode)
- Media Browser
- No function
- No function
- Picture mode selection
- Electronic programme guide
- Sleep Timer
- Menu on-off
- OK / Select / Hold (in TXT mode)
- Volume up / down
- Navigation buttons
- AV / Source
- Previous programme
- Blue button
- Yellow button
- No function
- Subtitle on-off / Subtitle (in Media Browser mode)
- No function
- Fast forward (in Media Browser mode)
- Stop (in Media Browser mode)
- Pause
- Standby
- Operation LED light


NOTE: The Remote Control range is proximately 7m / 23ft.
| ConnectorTypeCablesDevice | |||
![]() | Scart Connection (back) | ![]() | ![]() |
![]() | VGA Connection (back) | ![]() | ![]() |
![]() | PC/YPbPrAudio Connection (side) | ![]() | ![]() |
![]() | HDMI Connection (back) | ![]() | ![]() |
![]() | SPDIFF Connection (back) | ![]() | ![]() |
| SPDIFF | |||
![]() | SideAV Connection (side) | ![]() | ![]() |
![]() | Headphone Connection (side) | ![]() | |
![]() | USB Connection (side) | ![]() | [DX4S] |
![]() | CI Connection (side) | ![]() | ![]() |

NOTE: When connecting a device via the Side AV input, you must use the supplied connection cables to enable connection. See the illustrations above. | To enable PC audio, you will need to use the supplied SIDE AV CONNECTION cable's WHITE & RED inputs. | If an external device is connected via the SCART socket, the TV will automatically switch to AV mode. | When receiving DTV channels (Mpeg4 H.264) or while in Media Browser mode, output will not be available via the scart socket. | When using the wall mounting kit (optional), we recommend that you plug all your cables into the back of the TV before mounting on the wall. | Insert or remove the CI module only when the TV is SWITCHED OFF. You should refer to the module instruction manual for details of the settings. You can use the VGA input for connecting a YPbPr device. To do this, you need a YPbPr to PC cable (Not supplied).
Always connect a USB medium directly to the USB port on the TV. The use of a USB extension cord is not supported by the TV. The TV's USB port cannot communicate with a PC.
Installing the Batteries to the Remote
-
Lift the cover on the back of the remote upward gently.
-
Install two AAA batteries. Make sure to match the + and - ends of the batteries in the battery compartment (observe the correct polarity.
-
Replace the cover.

natural_image
Two black electronic devices with internal components, one showing a lens and the other a lens assembly (no visible text or symbols)Connect Power & Antenna/Cable/Satellite
IMPORTANT: The TV set is designed to operate on 220-240V AC, 50 Hz socket. After unpacking, allow the TV set to reach the ambient room temperature before you connect the set to the mains. Plug the power cable to the mains socket outlet.

flowchart
graph TD
A["SCART"] --> B["LNB"]
B --> C["40mA/16V"]
C --> D["Ant"]
D --> E["13V/16V"]
E --> F["DISEC Switch"]
F --> G["AerialorCable"]
G --> H["Satellite"]
style A fill:#f9f,stroke:#333
style H fill:#ccf,stroke:#333
Switching On/Off
Switching the TV On
With power cord plug connected to the mains power socket, the TV is in 'Standby' mode.
To switch the TV on from standby mode:
Press the “ ” button and the TV will switch to standby mode. Then the standby LED lights up.
To switch on the TV from standby mode either:
a. Press the "☐" button, P+ / P- or a numeric button on the remote control.
b. Press the middle of the “ ” button on the TV. By either method the TV will switch on.
Switching the TV Off
Press the "button on the remote control or press the standby " " button, so the TV will switch to standby mode.
To turn off the TV completely, remove the power cord plug from the mains power socket.
Note: When the TV is switched to standby mode, standby LED can blink to indicate that features such as Standby Search, Over Air Download or Timer is active. The LED can also blink when you switch on the TV from standby mode.
First Time Installation
When turned on for the first time, the "language selection" menu appears. The message "Welcome please select your language!" is displayed in all language options listed alphabetically.

Press the “↗” or “ ” button to highlight the required language, press OK button to select. “First Time Installation” appears. Use “〈” or “〉 button to set the required country, and press “↘” button to select Search Type (optional).
Use “” or “” to set the desired search type. Available search types are Digital and analog, digital only and analog only.
When set, press “√” to select Teletext Language. Use “<” or “” to select the desired Teletext Language. Next, select Scan Encrypted and set as Yes if you want to scan coded stations.

Press OK button on the remote control to continue and the following message will be displayed on the screen.

You must select a search type to search and store broadcasts from the desired source.
Aerial Installation
If you select AERIAL option from the Search Type screen, the television will search for digital terrestrial TV broadcasts.


NOTE: You can press MENU button to cancel.
After all the available stations are stored, Channel List will be displayed on the screen. If you like the sort channels, according to the LCN(*), please select "Yes" and then press OK.

Press OK button to quit channel list and watch TV.
(*) LCN is the Logical Channel Number system that organizes available broadcasts in accordance with a recognizable channel sequence.
Cable Installation
If you select CABLE option and press OK button on the remote control to continue, the following message will be displayed on the screen:

To continue please select YES and press OK. To cancel operation, select NO and press OK.
![Automatic channel scan (Retune) Start Frequency < [1] 14000 > KHz Stop Frequency 858000 KHz Search Step 8000 KHz](/content/2026/05/858726/images/f15dccfeb9c19eeb96b9b2a055384de139d3cadee225a7e190e3fd2d26ed3468.jpg)
You can select frequency ranges from this screen. For highlighting lines you see, use "or " button.
You can enter the frequency range manually by using the numeric buttons on the remote control.
Set Start and Stop Frequency as desired by using numeric buttons on the remote control.
After this operation, you can set Search Step as 8000 KHz or 1000 KHz.
If you select 1000 KHz, the TV will perform search process in a detailed way. Searching duration will thus increase accordingly. When finished, press OK button to start automatic search. The TV will search and store available broadcasts.
Satellite Installation
If you select Satellite option from the Search Type screen, you can set a satellite and watch satellite channels. When you select Satellite installation, Antenna Type menu will be displayed.
There are three types of antenna selection. You can select Antenna type as Direct, Unicable or DiSEqC switch by using “<” or “>buttons.

Direct: If you have a single receiver and a direct satellite dish, select this antenna type. After selecting Direct, another menu screen will be displayed. Select an available satellite and press OK to scan for services.
Unicable: If you have multiple receivers and a unicable system, select this antenna type. Press OK to continue. Configure settings by following instructions
on the screen. Press OK to scan for services.
DiSEqC switch: If you have multiple satellite dishes and a DiSEqC switch, select this antenna type. After selecting DiSEqC switch, another menu screen will be displayed. You can set four DiSEqC options (if available). Press GREEN button to scan all satellites or press YELLOW button to scan only the highlighted satellite. To save and exit press OK button.
Media Playback via USB Input
You can connect a USB hard disk drive or USB memory stick to your TV by using the USB inputs of the TV. This feature allows you to play files stored in a USB drive. 2.5" and 3.5" inch (hdd with external power supply) external hard disk drives are supported.
IMPORTANT! You should back up your files before making any connections to the TV set in order to avoid any possible data loss. Manufacturer will not be responsible for any file damage or data loss. It is possible that certain types of USB devices (e.g. MP3 Players) or USB hard disk drives/memory sticks may not be compatible with this TV. Note: While formatting a USB hard disk that has 1TB (Tera Byte) or more file capacity, you can experience problems with the formatting process.
Quickly plugging and unplugging USB devices, is a very hazardous operation. Do not repeatedly quickly plug and unplug the drive. This may cause physical damage to the USB player and USB device itself. Do not pull out USB module while playing a file.
Media Browser Menu
You can play photo, music, and movie files stored on a USB disk by connecting it to your TV and using the Media Browser screen. To do this, perform the following: Connect a USB disk to one of the USB inputs located on the side of the TV.
You can connect two USB devices to your TV. If both USB devices include music, picture or video files, USB selection OSD will be displayed on the screen. The first USB device connected to the TV will be named as USB Drive1. Select a device by using “^” or “√” button and press OK.
Press MENU button and select Media Browser tab by using Left/Right and OK buttons. Main media browser screen will be displayed. You can display the related content by selecting the Video, Music or Picture tab. Follow the button indications under each on screen menu for media playback features.
You can set your Media Browser preferences by using the Settings dialog.
Changing Image Size: Picture Formats
Programmes can be watched in different picture formats, depending on the transmission received. You can change the aspect ratio (image size) of the TV for viewing the picture in different zoom modes. Press SCREEN button repeatedly to change the image size. You can shift the screen up or down by using “^” or “” buttons while in Panaromic, 14:9 Zoom, Cinema or Subtitle.
Using the Channel List

The TV sorts all stored stations in the Channel List. You can edit this channel list, set favourites or set active stations to be listed by using the Channel List options. Press MENU button to view main menu. Select Channel List item by using Left or Right button. Press OK to view menu contents. Select Edit Channel List to manage all stored channels. Use Up or Down and OK buttons to select Edit Channel List. Press Up or Down button to select the channel that will be processed. Press Left or Right button to select a function on Channel List menu. Use P+/P- buttons to move page up or down. Press MENU button to exit.
Sorting Channel List
You can select broadcasts to be listed in the channel list. To display specific types of broadcast, you should use Active channel list setting. Select Active channel list from the Channel list menu by using “” or “” button. Press
OK button to continue. You can select a network type option from the list by using “<” or “>” and OK buttons.
Menu Features and Functions
| Picture Menu Contents | |
| Mode | For your viewing requirements, you can set the related mode option. Picture mode can be set to one of these options: Cinema, Game, Dynamic, Sport and Natural. |
| Contrast Sets the | lightness and darkness values of the screen. |
| Brightness Sets | the brightness value for the screen. |
| Sharpness Sets | the sharpness value for the objects displayed on the screen. |
| Colour Sets the colour value, adjusting the colors. | |
| Power Save Mode | To set Power Save Mode as Eco, Picture Off and Disabled. See the section, “Environmental Information” in this manual for further information on Power Save Mode. |
| Backlight (optional) | This setting controls the backlight level and it can be set to Auto, Maximum, Minimum and Eco Mode. Backlight function will be inactive if Power Save Mode is set to On. Backlight cannot be activated in VGA, Media Browser mode or while the picture mode is set to Game. |
| Noise Reduction | If the broadcast signal is weak and the picture is noisy, use Noise Reduction setting to reduce the noise amount. Noise Reduction can be set to one of these options: Low, Medium, High or Off. |
| Advanced Settings | |
| Dynamic Contrast | You can change contrast rate by using dynamic contrast function. Dynamic contrast can be set to one of these options: Low, Medium, High or Off. |
| Colour Temp Sets the desired colour tone. | |
| Picture Zoom | Sets the picture size to Auto,16:9, Subtitle,14:9, 14:9 Zoom, 4:3, Panoramic or Cinema. |
| HDMI True Black(optional) | While watching from HDMI source, this feature will be visible in the Picture Settings menu. You can use this feature to enhance blackness in the picture. |
| Film Mode (optional) | Films are recorded at a different number of frames per second to normal television programmes. Tum this feature on when you are watching films to see the fast motion scenes clearly. |
| Skin Tone Adjust | the desired skin tone. |
| Colour Shift Adjust | the desired colour tone. |
| RGB Gain | Press OK button to edit RGB gain. You can configure the colour temperature values using the RGB Gain feature. |
| Reset Resets the | picture settings to factory default settings. |
| Autoposition (in PC mode) | Automatically optimizes the display. Press OK to optimize. |
| H Position (in PC mode) | This item shifts the image horizontally to right hand side or left hand side of the screen. |
| V Position (in PC mode) | This item shifts the image vertically towards the top or bottom of the screen. |
| Dot Clock (in PC mode) | Dot Clock adjustments correct the interference that appear as vertical banding in dot intensive presentations like spreadsheets or paragraphs or text in smaller fonts. |
| Phase (in PC mode) | Depending on the resolution and scan frequency that you input to the TV set, you may see a hazy or noisy picture on the screen. In such a case you can use this item to get a clear picture by trial and error method. |
| While in VGA (PC) mode, some items in Picture menu will be unavailable. Instead, VGA mode settings will be added to the Picture Settings while in PC mode. | |
Menu Features and Functions
| Sound Menu Contents | |
| Volume Adjusts volume level. | |
| Equalizer: | In equalizer menu, the preset can be changed to Music, Movie, Speech, Flat, Classic and User. Press the MENU button to return to the previous menu. Equalizer menu settings can be changed manually only when the Equalizer Mode is in User. |
| Balance This setting is used for emphasizing left or right speaker balance. | |
| Headphone Sets headphone volume. | |
| Sound Mode | You can select Mono, Stereo, Dual I or Dual II mode, only if the selected channel supports that mode. |
| AVL | Automatic Volume Limiting (AVL) function sets the sound to obtain fixed output level between programmes (For instance, volume level of advertisements tend to be louder than programmes). |
| Digital Out Sets digital out audio type. | |
| Install and Retune Menu Contents | |
| Automatic Channel Scan (Retune) | Displays automatic tuning options.Digital Aerial: Searches and stores aerial DVB stations.Digital Cable: Searches and stores cable DVB stations.Analogue: Searches and stores analogue stations.Digital Aerial & Analogue: Searches and stores aerial DVB and analogue stations.Digital Cable & Analogue: Searches and stores cable DVB and analogue stations.Satellite: Searches and stores satellite stations. |
| Manual Channel Scan | This feature can be used for direct broadcast entry. |
| Network Channel Scan | Searches for the linked channels in the broadcast system. |
| Analogue Fine Tune | You can use this setting for fine tuning analogue channels. This feature is not available if no analogue channels are stored. |
| First Time Installation | Deletes all stored channels and settings, resets TV to factory settings and starts first time installation. You can follow the instructions in the Initial Installation section for more information on this process. |
Menu Features and Functions
| Settings Menu Contents | |
| Conditional Access | Controls conditional access modules when available. |
| Language Configures | language settings. |
| Parental Configures p | parental settings. |
| Timers Sets timers for | selected programmes. |
| Date/Time Sets date and time. | |
| Sources Enables or dis | sables selected source options. |
| Satellite Settings Dis | plays satellite settings. |
| Other Settings: Displays other setting options of the TV set: | |
| Menu Timeout Changes | timeout duration for menu screens. |
| Scan Encrypted | When this setting is on, search process will locate the encrypted channels as well. If it is set as Off, encrypted channels will not be located in automatic search or manual search. |
| Blue Background | Activates or deactivates blue background system when the signal is weak or absent. |
| Software Upgrade | To ensure that your TV always has the most update information, you can use this setting. In order for the proper operation, please ensure that the TV is set to standby mode. |
| Application Version | Displays application version. |
| Hard of Hearing | If the broadcaster enables any special signal concerning the audio, you can set this setting as On to receive such signals. |
| Audio Description | Audio description refers to an additional narration track for blind and visually impaired viewers of visual media, including television and movies. You can use this feature, only if the broadcaster supports that additional narration track. |
| Auto TV Off | You can set the timeout value of auto off feature. After the timeout value is reached and the Tv is not operated for selected time , the TV will go off. |
| Biss Key | Biss is a satellite signal scrambling system that is used for some broadcasts. If you need to enter BISS key on a broadcast, you can use Biss Key setting located in the Other Settings menu. Highlight Biss Key and press OK to enter keys on the desired broadcast. |
| Standby Search (optional) | If you change Standby Search to Off, this function will be unavailable. To use Standby search please make sure that you select Standby Search as On. If the Standby Search is set to On, when the TV is in standby mode, available broadcasts will be searched. If the TV locates any new or missing broadcasts, a menu screen will be displayed, asking you whether or not to execute these changes. Channel list will be updated and changed after this process. Please activate Standby Search setting in order to enable your TV for automatically updating the broadcast frequency of the broadcaster, broadcast definition and similar changes. |
Electronic Programme Guide (EPG)
Some, but not all channels send information about the current and next programmes. Press the GUIDE button to view the EPG menu.

Up/Down/Left/Right: Navigate EPG.
OK: Displays programme options.
INFO: Displays, in detail information on programme selected.
GREEN: Switches to List Schedule EPG.
YELLOW: Switches to Timeline Schedule EPG.
BLUE: displays filtering options.
Teletext
“teletext / Mix: Activates teletext mode when pressed once. Press again to place the teletext screen over the programme (mix). Pressing again will quit the teletext mode.
"RETURN" Index: Selects the teletext index page.
"INFO" Reveal: Shows hidden information (e.g. solutions of games).
"OK" Hold: Holds a text page when convenient. Press again to resume.
“◀”/“▶ Subcode Pages: Selects subcode pages if available when the teletext is activated.
P+ / P- and numbers (0-9): Press to select a page.
Note: Most TV stations use code 100 for their index pages.
Your TV supports both FASTEXT and TOP text systems. When these systems are available, the pages are divided into groups or topics. When FASTEXT system is available, sections in a teletext page will become colour-coded and can be selected by pressing the coloured buttons. Press a coloured button that corresponds to with your needs. The coloured writings will appear, showing you which coloured buttons to use when TOP text transmission is present. Pressing “▼” or “▲” commands will request the next or previous page respectively.
Digital Teletext (for UK only)
- Press the 📄 button. The digital teletext information appears. Operate it with the coloured buttons, cursor buttons and OK button.
The operation method may differ depending on the contents of the digital teletext. Follow the instructions displayed on digital teletext screen.
When the "☐" button is pressed again, the TV returns to television broadcasting.
Software Upgrade
Your TV is capable of finding and updating new software upgrades over broadcast channels. For broadcast channels search, TV looks the available channels stored in your settings. So before software upgrade search, it is advised to auto search and update all available channels.
1) Software upgrade search via user interface
- It is possible manually to check if there is a new software upgrade for your TV set.
- Simply navigate on your main menu. Choose Settings and select Other Settings menu. In Other Settings menu navigate on to the Software Upgrade item and press OK button to open Upgrade Options menu.
- In Upgrade Options menu select Scan for upgrade and press OK button.
- If a new upgrade is found, it starts to download the upgrade. A progress bar indicates the remaining download progress. When download completes with success a message is displayed for reboot to activate new software. Press OK to continue with the reboot operation.
2) Background search and upgrade mode
- While TV is connected to Internet, in background it searches for critical software upgrades. If a critical software upgrade is found it downloads the upgrade silently. When download completes with success a message is displayed for reboot operation to activate new software. Press OK to continue with the reboot operation.
3) 3.AM search and upgrade mode
- If Automatic scanning in Upgrade Options menu is enabled, TV wakes up at 03:00 and searches broadcast channels for new software upgrade. If new software is found and downloaded successfully, with next power up TV opens with new software version.
Note on reboot operation: Reboot is the last step in software upgrade operation if download of new software is finished successfully. During reboot TV makes final initialization. In reboot sequence panel power is closed and front led indicates the activity with blinking. Around 5 minutes later TV restarts with new software activated.
- If your TV fails to restart in 10 minutes, unplug power for 10 minutes and re-plug again. TV should open with new software safely. If you still can not get TV working, please kindly repeat unplug and plug sequence a few times more. If your set still can not operate, please call the service personnel to fix the problem for you.
Caution: While led is blinking during reboot do not unplug your TV's power. Doing this may cause your TV not to re-open again and can only be fixed by service personnel.
Troubleshooting & Tips
Image persistence - ghosting
Please note that ghosting may occur while displaying a persistent image (still or paused image). LCD TVs' image persistence may disappear after a short time. Try turning off the TV for a while. To avoid this, do not leave the screen in still picture mode for extended periods.
No power
If your TV has no power, please check the power cord plug is connect to the mains power socket.
Poor picture
- Have you selected the correct TV system?
- Is your TV or house aerial located too close to a non-earthed audio equipment or neon lights, etc.?
- Mountains or high buildings can cause double pictures or ghost images. Sometimes you can improve the picture quality by changing the direction of the aerial. Is the picture or teletext unrecognisable?
- Check if you have entered the correct frequency.
- Please retune the channels.
- The picture quality may degrade when two devices are connected to the TV at the same time. In such a case, disconnect one of the devices.
No picture
- No Picture means that your TV is not receiving a transmission. Have you selected the correct button on the remote control? Try once more. Also make sure the correct input source has been selected.
- Is the aerial connected properly?
- Are the plugs connected tightly to the aerial socket?
- Is the aerial cable damaged?
- Are suitable plugs used to connect the aerial?
- If you are in doubt, consult your dealer.
No sound
- Has the TV been set to mute? To cancel mute, press the "OK" button, or increase the volume level.
- Sound is coming from only one speaker. Is the balance set to one extreme? See Sound Menu section.
Remote control - does not operate
Your TV no longer responds to the remote control. The batteries may be exhausted, if so you can still use the control buttons on the TV. (* Is only possible if they are not blocked by parental control.)
Input sources - can not be selected
- If you cannot select an input source, it is possible that no device is connected.
- Check the AV cables and connections if you have tried to connect a device.
Manufactured under license from Dolby Laboratories.
TRADEMARK ACKNOWLEDGMENT
"Dolby" and the double-D symbol are trademarks of Dolby Laboratories.

DIGITAL PLUS
Information for Users on Disposal of Old Equipment and Batteries
[European Union only]
These symbols indicate that equipment with these symbols should not be disposed of as general household waste. If you want to dispose of the product or battery, please consider the collection systems or facilities for appropriate recycling.
Notice: The sign Pb below the symbol for batteries indicates that this battery contains lead.


Products

Battery
PC Typical Display Modes
The following table is an illustration of some of the typical video display modes. Your TV may not support all resolutions. Your TV supports up to 1920x1080.
| Index | Resolution Frequency |
| 1 640x350p 60 Hz | |
| 2 640x400p 60 Hz | |
| 3 1024x768 60 Hz | |
| 4 1280x768 60 Hz | |
| 5 1360x768 60 Hz | |
| 6 720x400 60 Hz | |
| 7 800x600 56 Hz | |
| 8 800x600 60 Hz | |
| 9 1024x768 60 Hz | |
| 10 1024x768 66 Hz | |
| 11 1280x768 60 Hz | |
| 12 1360x768 60 Hz | |
| 13 1280x1024 60 Hz | |
| 14 1280x960 60 Hz | |
| 15 1280x1024 60 Hz | |
| 16 1400x1050 60 Hz | |
| 17 1920x1080 60 Hz | |
| 18 1600x1200 60 Hz |
Specifications
TV BROADCASTING
PAL/SECAM B/G D/K K' I/I' L/L'
DIGITAL RECEPTION
DVB-T MPEG2
DVB-T MPEG4 HD
DVB-T MHEG-5 Engine (for UK only)
DVB-C MPEG2
DVB-C MPEG4 HD
DVB-S / S2 MPEG2
DVB-S / S2 MPEG4 HD
RECEIVING CHANNELS
VHF (BAND I/III)
UHF (BAND U)
HYPERBAND
NUMBER OF PRESET CHANNELS
10000
CHANNEL INDICATOR
On Screen Display
RF AERIAL INPUT
75 Ohm (unbalanced)
OPERATING VOLTAGE
220-240V AC, 50 Hz.
AUDIO
German + Nicam Stereo
AUDIO OUTPUT POWER (W _RMS. ) (10% THD)
2×2,5
POWER CONSUMPTION (W)
45 W (max)
PANEL
16:9 display, 22" Screen Size
DIMENSIONS (mm)
DxLxH (With foot):134 x 530 x376
Weight (Kg): 4,45
DxLxH (Without foot): 35 x 530x 340
Weight (Kg): 4,25
Technical specifications and design may change without notice.
Supported File Formats for USB Mode
| Media File | Extension | Format | Remarks | |
| Video Audio (Maximum resolution/Bit rate etc.) | ||||
| Movie | .mpg .mpeg MPEG1,2 MPEG Layer 1/2/3 | MAX 1920x1080 @ 30P 20Mbit/sec | ||
| .dat MPEG1,2 | MPEG2 | |||
| .vob MPEG2 | ||||
| .mkv H.264, MPEG1,2,4 EAC3/ AC3 | ||||
| .mp4 | MPEG4Xvid 1.00,Xvid 1.01, Xvid 1.02, Xvid 1.03,Xvid 1.10-beta1/2H.264 | PCM/MP3 | ||
| .avi | MPEG2, MPEG4 | |||
| Xvid 1.00,Xvid 1.01, Xvid 1.02, Xvid 1.03,Xvid 1.10-beta1/2H.264 | PCM | |||
| Music .mp3 - | MPEG 1 Layer 1 /2 (MP3) | 32Kbps ~ 320Kbps(Bit rate)32KHz ~ 48KHz(Sampling rate) | ||
| Photo | .jpg .jpeg Baseline JPEG - max WxH = 15360x8640 | 4147200bytes | ||
| . | Progressive JPEG | - | max WxH = 9600x6400 3840000bytes | |
| .bmp - | - | max WxH = 9600x6400 3840000bytes | ||
| Subtitle | .sub .srt | - | - | - |
























