Product TypeSoftware for room control and management
Compatible PlatformCrestron Virtual Control (VC-4) server-based control system
Management InterfaceWeb-based configuration utility via supported browsers (Firefox, Chrome, Safari, Edge, Internet Explorer)
Programming RequirementNone (no programming required)
Supported Device TypesTouch screens (TSW-752, TSW-1052, TSW-760, TSW-1060), button panels (MP-B10, MP-B20), A/V switchers (HD-MD series, AM-200, AM-300), virtual switchers, AirMedia gateways, flat panel displays, projectors, occupancy sensors, room signs, control modules, etc.
Maximum Number of RoomsMultiple rooms per server (each with unique name and ID)
Room Scheduling IntegrationCrestron Fusion software
AuthenticationToken-based authentication (admin username/password + token)
CustomizationCustom logo, screensaver background, help page, start button text
Driver ManagementBuilt-in drivers for displays, projectors, cable boxes, Blu-ray players, video servers; import from Crestron Certified Drivers portal
Supported LanguagesMultiple languages via drop-down selection
System MonitoringDashboard with Ethernet info, switcher status, equipment status; event log
User ManagementCreate, edit, delete users with username, password, surname, given name
Configuration BackupDownload and upload configuration as .zip file
Touch Screen Project File.vtz file for TSW series and XPanel (web)
Network ConnectivityEthernet (IP), supports IP table and Connect Request method
DimensionsNot applicable (software)
WeightNot applicable (software)
Power SupplyNot applicable (software)

Frequently Asked Questions - VC-4-ROOM-1-49 Crestron

What is .AV Framework for Crestron Virtual Control?
.AV Framework is a web-based management software that allows you to deploy scalable Crestron enterprise room solutions without programming. It runs on the Crestron Virtual Control (VC-4) server.
How do I access the .AV Framework configuration utility?
Log into the Crestron Virtual Control web interface, navigate to Status > Rooms, click the information button (i) for your room, then click the Configuration URL link. Log in with username 'admin' and the default password 'admin', plus an authentication token generated from Settings > Tokens.
What devices are supported by .AV Framework?
Supported devices include TSW series touch screens, MP-B10/B20 button panels, HD-MD switchers, AM-100/101/200/300 AirMedia gateways, virtual switchers via displays, flat panel displays, projectors, occupancy sensors, room signs, and control modules. See the product feature chart in the manual for full details.
How do I add a new room in Crestron Virtual Control?
In the Crestron Virtual Control web interface, go to Status > Rooms, click Add Room, select the .AV Framework program, enter a unique room name and ID, and click Add. The program status should change to Running.
How do I set up scheduling with Crestron Fusion?
In the configuration utility, go to Configure > System > Crestron Fusion tab. Enter the Crestron Fusion room name, IPID, enable scheduling, and set timeout options. Click Save and Enable. The Crestron Fusion server URL must be set in the VC-4 system setup.
Can I customize the touch screen interface?
Yes, in Configure > System > Touch Screen Custom Graphics, you can enable a custom logo (URL, 800x600 pixels), custom screensaver backgrounds (up to 15, BMP/JPG/PNG), custom help page, and a start button with custom text.
How do I add a device driver?
Go to Configure > System > Drivers tab. Use the Search button to open the Crestron Certified Drivers web portal, download .pkg files (zipped), then click Import on the Drivers page and select the .zip file. Activate the configuration after successful installation.
What is the default username and password for .AV Framework?
The default username and password are both 'admin'. For security, change the password after first login via the Users > Manage page.
How do I reset or revert a configuration?
If you make changes that require activation, the system shows a red status bar. Go to Configure > Configuration Management. Click Activate Configuration to apply changes or Revert Configuration to discard them.
Can I use .AV Framework without a physical touch screen?
Yes. You can use the built-in XPanel (web-based virtual touch screen) by adding a touch screen device with model 'Webx' and IP ID 04, then access the XPanel URL from the room details page.

User questions about VC-4-ROOM-1-49 Crestron

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Software in PDF format for free! Find your manual VC-4-ROOM-1-49 - Crestron and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. VC-4-ROOM-1-49 by Crestron.

USER MANUAL VC-4-ROOM-1-49 Crestron

.AV Framework™ Software for Crestron Virtual Control Software

Operations Guide

Crestron Electronics, Inc.

Original Instructions

The U.S. English version of this document is the original instructions.

All other languages are a translation of the original instructions.

Crestron product development software is licensed to Crestron dealers and Crestron Service Providers (CSPs) under a limited non-exclusive, non-transferable Software Development Tools License Agreement. Crestron product operating system software is licensed to Crestron dealers, CSPs, and end-users under a separate End-User License Agreement. Both of these Agreements can be found on the Crestron website at www.crestron.com/legal/software-license-agreement.

The product warranty may be found at www.crestron.com/legal/sales-terms-conditions-warranties.

The specific patents that cover Crestron products are listed at www.crestron.com/legal/patents.

Certain Crestron products contain open source software. For specific information, visit www.crestron.com/legal/open-source-software.

Crestron, the Crestron logo, AirMedia, AV Framework, Cresnet, Crestron Connected, Crestron Fusion, Crestron Toolbox, D3 Pro, DM, RoomView, and SystemBuilder are either trademarks or registered trademarks of Crestron Electronics, Inc. in the United States and/or other countries. Macintosh and Safari are either trademarks or registered trademarks of Apple, Inc. in the United States and/or other countries. Blu-ray, Blu-ray Disc, and the Blu-ray logo are either trademarks or registered trademarks of the Blu-ray Disc Association (BDA) in the United States and/or other countries. Chrome is either a trademark or a registered trademark of Google, Inc. in the United States and/or other countries. HDMI and the HDMI logo are either trademarks or registered trademarks of HDMI Licensing LLC in the United States and/or other countries. Linux is either a trademark or a registered trademark of Linus Torvalds in the United States and/or other countries. Internet Explorer, Microsoft Edge, and Windows are either trademarks or registered trademarks of Microsoft Corporation in the United States and/or other countries. Firefox is either a trademark or a registered trademark of the Mozilla Foundation in the United States and/or other countries. MultiSync and NEC are either trademarks or registered trademarks of NEC Display Solutions, Ltd, in the United States and/or other countries. Panasonic is either a trademark or a registered trademark of Panasonic Corporation in the United States and/or other countries. Samsung is either a trademark or a registered trademark of Samsung Electronics Co., Ltd, in the United States and/or other countries. Sharp is either a trademark or a registered trademark of Sharp Corporation in the United States and/or other countries. Sony is either a trademark or a registered trademark of Sony Corporation in the United States and/or other countries. Wi-Fi is either a trademark or a registered trademark of Wi-Fi Alliance in the United States and/or other countries. Other trademarks, registered trademarks, and trade names may be used in this document to refer to either the entities claiming the marks and names or their products. Crestron disclaims any proprietary interest in the marks and names of others. Crestron is not responsible for errors in typography or photography. ©2019 Crestron Electronics, Inc.

Contents

Introduction....1

Product Features....2

Setup....4

Load the Program Files 4

Add .AV Framework Rooms....7

Generate an Authentication Token....9

Access the Configuration Utility....11

Add an A/V Switcher....14

Add New Devices....18

Configuration....20

Navigate the Configuration Utility....20

Status Menu....20

AV Framework Dashboard.... 21

AVF Log....24

Configure Menu....25

System Setup....26

Device Management....38

Inputs/Outputs....43

Manage Configuration....44

Users Menu 47

Operation....49

Display Overview....49

Home Screen Overview....50

No Scheduling Calendar Connected 50

Room Available 51

Room Reserved 53

Reserve a Meeting from the Home Screen....53

Access the System Info Screen 54

Present a Source Screen Overview 56

Now Presenting Screen - HDMI Source 57

Connect to AirMedia Screen 58

Now Presenting Screen - AirMedia Source 59

Now Presenting Screen - Other Source Devices....60

Appendix A: Interface Setup 61

Connection Overview 61

TSW Series Touch Screens....62

XPanel....65

AM-100/AM-101 68

MP-B10/MP-B20....69

Crestron Fusion....71

Connect to Crestron Fusion....71

Room Control and Monitoring....75

Appendix B: Device Configuration 78

AirMedia....78

Blu-ray™ Player....78

Button Panel 79

Cable TV....79

Cresnet Gateway....79

Crestron IO....80

DigitalMedia Transmitter....80

Flat Panel Display 81

Occupancy Sensor 82

Projector 83

Room Availability Hallway Sign....83

Touch Screen 84

Video Server 84

.AV Framework™ Software for Crestron Virtual Control Software

Introduction

Crestron® .AV Framework™ software is a web-based management solution that is used to deploy scalable Crestron enterprise room solutions without requiring any programming. The .AV Framework configuration utility is accessible from most web browsers and provides the following functions:

  • Select sources and displays.
  • Configure device control for Blu-ray Disc® players, cable TV boxes, and video servers.
  • Add a compatible touch screen to generate the GUI for a single or multiple display systems.
  • Add a compatible button panel to control single display systems.
  • Connect to Crestron Fusion® software to monitor and control basic room data, system power, source selection, and room scheduling.
  • Customize the .AV Framework user experience with additional components, custom functionality, and corporate logos.

.AV Framework is compatible with the Crestron Virtual Control series of server-based control systems. Add the .AV Framework program to a room on the Crestron Virtual Control server, and then add a supported Crestron A/V auto-switcher device or a virtual switcher device (via a compatible flat panel display or projector) to the room for complete configuration and control.

This document provides instructions for setting up the .AV Framework program on the Crestron Virtual Control server, as well as an overview of the setup screens and functions provided in the .AV Framework configuration utility.

The following supplemental documents are available at www.crestron.com/manuals:

  • For more information on installing Crestron Virtual Control, refer to the Crestron Virtual Control Installation Guide (Doc. 8274).
  • For more information on secure deployment for the Crestron Virtual Control server, refer to the Crestron Virtual Control Deployment Guide (Doc. 8272).
  • For more information on integrating the Crestron Virtual Control server in an existing intranet site using the secure REST API platform, refer to the Crestron Virtual Control REST API Programming Guide (Doc. 8314).

Product Features

Refer to the following chart to determine the devices and product features that are compatible with .AV Framework for Crestron Virtual Control (VC-4).

.AV Framework Product Feature Chart

FEATURE CLASS FEATURE VC-4
AirMedia® Presentation GatewayAM-100Yes
AM-101Yes
AM-200Yes
AM-300Yes
Button PanelMP-B10 (Ethernet)Yes
MP-B10 (Cresnet)Yes 1
MP-B20 (Ethernet)Yes
MP-B20 (Cresnet)Yes 1
Cable CaddyTT-100 (Cresnet)Yes 1
TT-100 (USB) No
TT2-100 (Cresnet)Yes 1
TT2-100 (USB) No
SwitcherHD-MD-510-4K-C-EFuture release
HD-MD-200-C-EYes
HD-MD-200-C-1G-EYes
HD-MD-300-C-EYes
HD-MD-400-C-EYes
HDI-MD-400-C-2G-EYes
AM-200Yes
AM-300Yes
Virtual SwitcherYes
Occupancy SensorGLS-OIR-C-CNYes 1
GLS-ODT-C-CNYes 1
EndpointDM-RMC-4K-100-CNo
DM-RMC-4K-10-C-1GNo
DM-RMC-200-CNo
DM-RMC-SCALER-CNo
DM-RMC-4K-SCALER-CNo
DM-TX-201-CNo
DM-TX-401-CNo
DM-TX-4K-100-C-1GNo
DM-TX-4K-202-CNo
DM-TX-4K-302-CNo
DM-TX-201-C-GNo
Endpoint (continued)DM-RMC-4KZ-100-CNo
DM-RMC-4KZ-SCALER-CNo
DM-TX-4KZ-202-CNo
DM-TX-4KZ-302-CNo
Room SignSSW/SSC-PCBYes 1
Touch ScreenTSW-752Yes
TSW-1052Yes
TSW-760Yes
TSW-1060Yes
Web XPanelYes
Control ModulesDIN-CEN-CN-2Yes
C2N-IOYes 1
CEN-IO-COM-102Yes
CEN-IO-IR-104Yes
CEN-IO-RY-104Yes
DriversDisplay/ProjectorYes 1
Cable BoxYes 1
Blu-ray Disc PlayerYes 1
Video ServerYes 1
Driver Portal SearchYes
Driver Portal ImportYes
Projector ScreenRelay ControlYes with CEN-IO-RY-104
Volume ControlDSP No
Display/ProjectorYes
DisplaysNumber of Displays 1
External Amplifier SupportYes
SourcesMax Number of Sources4 (HD-MD) or more depending on display
Crestron FusionSchedulingYes
Monitoring/ReportingYes
CustomizationCustom Logo GraphicYes
ScreensaverYes
Start ButtonYes
Custom Start Button TextYes
Help Page CustomizationYes
Video RoutingManual (from Touch Screen)Yes
Automatic (Based on Sync)No
Audio Breakaway No
AuthenticationMultiple LoginYes
OtherAutomatic Load and Update of Touch Screen ProjectYes

1 Requires an external Crestron control module gateway.

Setup

.AV Framework for Crestron Virtual Control can be installed and configured using the Firefox ® , Internet Explorer ® , Microsoft Edge ® , Safari ® browser, or Chrome ® web browsers.

Load the Program Files

Download the .AV Framework program for Crestron Virtual Control from the Crestron Virtual Control product pages or from the Software & Firmware section at https://www.crestron.com/Support.

The zipped package file includes the following components:

NOTE: The program and project files must be used as a version-matched pair and cannot be edited or customized.

• The .AV Framework program file (AVFPlugin[Version#].cpz)
- The touch screen project file (AVF_UI_1050_[Version#].vtz)
• Web XPanel interface files (AVFWebX.zip)
- Configuration page files (index.zip)

To upload the .AV Framework program to the Crestron Virtual Control server:

NOTE: The Crestron Virtual Control server must be installed and configured completely prior to loading the .AV Framework program. For more information, refer to the Crestron Virtual Control Installation Guide (Doc. 8274) and the Crestron Virtual Control Deployment Guide (Doc. 8272).

  1. Download and extract the contents of the .AV Framework for Crestron Virtual Control zipped package file to a location on the network that can be accessed by the Crestron Virtual Control web user interface.
  2. Enter "http://[ServerURL]/VirtualControl/config/settings/" into a supported web browser, where [ServerURL] is the IP address or hostname of the Linux® software platform where the Crestron Virtual Control service is installed.
    The Crestron web user interface is displayed with the Status > Rooms page open by default.

Crestron Virtual Control Web User Interface

CRESTRON VIRTUAL CONTROL Server: ubuntu ✓ Actions ✓ Status Settings Rooms Global Filter Add Room Room ○ Room ID ● Status ● Program ● Actions No records found 1 10 ► Devices ► Device Info ► Network © 2018 Crestron Electronics, Inc. Privacy Statement | Crestron Unified Communication Software License Agreement

  1. Select Add Program from the Actions drop-down menu on the top-right of the configuration utility.

Actions Menu

Actions Save Revert Add Program... Add Room...

The Add Program dialog box is displayed.

Add Program Dialog Box - Enter Details
Add Program - Step 1 of 2 Enter Details Choose Files Name* Enter program name Description Enter description (optional) Program File* + Choose Cancel Next >

  1. Enter a user-defined name for the program and a description (optional) in the appropriate text fields.

  2. Click Choose, navigate to the extracted package file contents on the network, and select the AVFPlugin[Version#].cpz program file.

  3. Click Next.

  4. Click Choose next to a file type to select the necessary .AV Framework program file, and the click Upload to upload the file to the program. The following files must be uploaded:

a. For XPanel (Web), select and upload the AVFWebX.zip file.
b. For Configuration Pages, select and upload the index.zip file.
c. For TSW Project, select and upload the AVF_UI_1052_[Version#].vtz file.

Add Program Dialog Box - Choose Files
Add Program - Step 2 of 2 Enter Details Choose Files XPanel (Web) + Choose Upload Configuration Pages + Choose Upload Mobile Project + Choose Upload TSW Project + Choose Upload Cancel Add

  1. Click Add. The program files are added to the server.

The touch screen project .vtz file can be loaded to a supported touch screen or to XPanel as a custom project. The touch screen project provides a user interface for controlling the .AV Framework room.

- For more information on loading the .vtz file to a supported touch screen, refer to the touch screen documentation at www.crestron.com/manuals.

- For more information on loading the .vtz file to XPanel, refer to "XPanel" on page 65.

Add .AV Framework Rooms

Once the .AV Framework program is uploaded to the Crestron Virtual Control server, it can be used to add one or more rooms to the server.

For more information on adding and using rooms with Crestron Virtual Control, refer to the embedded help file by clicking the help button ? on the top right of the configuration utility.

To add the .AV Framework program to a room:

  1. Click the Status tab.

  2. Click Rooms to open the Rooms section (if it is not open already).

Status Tab - Rooms

CRESTRON VIRTUAL CONTROL Server: ubuntu ✓ Actions ✓ Status Settings Rooms Global Filter Add Room Room ✓ Room ID ✓ Status ✓ Program ✓ Actions No records found 1 10 ► Devices ► Device Info ► Network © 2018 Crestron Electronics, Inc. Privacy Statement | Crestron Unified Communication Software License Agreement

  1. Click Add Room. The Add Room dialog box is displayed.

Add Room Dialog Box
Add Room Program * Select a Program Room Name * Enter room name Room ID * Enter room ID Street Address Enter address Address sets location data On Latitude Enter address to calculate Longitude Enter address to calculate Time Zone America/New_Yurk Notes Enter notes (optional) User File + Choose Cancel Add

  1. Use the Program drop-down menu to select the .AV Framework program.
  2. Enter a room name, room ID, location information (optional), and notes (optional) using the appropriate text fields and drop-down menus.

NOTES:

  • Multiple rooms can run the same .AV Framework program. However, each room must have a unique room name and room ID to differentiate each program instance.
  • The name entered in the Room Name text field dictates the name of the associated .AV Framework room when it is created. Any change made to the room name in the Crestron Virtual Control web interface or in .AV Framework is reflected in both locations. This synchronization can be sabled using the System Setup page in .AV Framework. For more information, refer to "System" on page 26.

  • Click Add. A notification appears if the room is saved successfully, and the room is added to the list of rooms on the Status > Rooms page. After initialization, the program status should change to Running.

Status Tab - Rooms (Room Added)

CRESTRON VIRTUAL CONTROL Server: ubuntu Actions Status Settings Rooms Global Filter Add Room Room Room ID Status Program Actions AVFRoom01 AVFROOM01 Running AVFramework01 Devices Device Info Network © 2018 Crestron Electronics, Inc. Privacy Statement | Crestron Unified Communication Software License Agreement

  1. Repeat steps 3-6 for any other rooms that will be added using the .AV Framework program.

Generate an Authentication Token

A token generated by the Crestron Virtual Control server is required to access the .AV Framework configuration utility prior to initial login. The Crestron Virtual Control server authenticates this token when the login request is sent.

To generate an authentication token:

  1. Navigate to Settings > Tokens.

Settings Page - Tokens
Status Settings System Setup Program Library Tokens Add Token Token Description Actions 10 Authentication Management

  1. Click + Add Token. The Add Token dialog box displays.

Add Token Dialog Box
Add Token Description AVF Cancel Add

  1. Enter a descriptive name for the token in the Description text field.
  2. Click Add. A token is generated and added to the interface.

Tokens
Tokens Add Token Token Desription Actions eyJhbGciOJlUzl1NllsInR5cCl6IlkpXVC AVF 1 10

Access the Configuration Utility

Configure settings for the .AV Framework room using the web-based configuration utility. The configuration utility for each .AV Framework room is accessible from the Crestron Virtual Control web interface.

To access the configuration utility for an .AV Framework room from the Crestron Virtual Control web interface:

NOTE: Prior to accessing the configuration utility, ensure that all devices in the .AV Framework room have been updated to their latest firmware versions.

  1. Click the Status tab.
  2. Click Rooms to expand the Rooms section.

Status Tab - Rooms

CRESTRON VIRTUAL CONTROL Server: ubuntu Actions Status Settings Rooms Global Filter Add Room Room Room ID Status Program Actions AVFRoom01 AVFROOM01 Running AVFramework01 + - 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - © 2018 Crestron Electronics, Inc. Privacy Statement | Crestron Unified Communication Software License Agreement

  1. Click the information button i under the Actions column for the room that will be configured. The Status > Details page for the room is displayed.

Status Tab - Details
Status Settings Details Program Status Running Program AVFramework2 Street Address Rockleigh, New Jersey Time Zone America/New_York Room ID AVFROOM01 Configuration URL /VirtualControl/Rooms/AVFROOM01/Html XPanel URL /VirtualControl/Rooms/AVFROOM01/XPanel/Core3XPanel.htm Notes Devices

  1. Click the link next to Configuration URL. The .AV Framework login page is displayed.

.AV Framework Login Page
CRESTRON AV FRAMEWORK The system is currently online. CRESTRON AV FRAMEWORK AVF 08918 Username Password Virtual Control Token is required. Virtual Control Token Sign In Version 1.2.1509.0 © 2018 Crestron Electronics, Inc.

  1. Enter the default username and password ("admin") in the Username and Password text fields.
  2. Enter a valid authentication token in the Virtual Control Token text field. For more information, refer to "Generate an Authentication Token" on page9.

7. Click Sign In.

Upon successful login, the AV Framework Dashboard page (the utility's default page) is displayed.

AV Framework Dashboard Page

CRESTRON AV FRAMEWORK The system is currently online. Status• Configure• Users• AV Framework Dashboard Ethernet Information Host Name: ubuntu IP Address: 172.30.16.172 Subnet Mask: 255.255.255.0 Default Router: 172.30.16.1 Device Mgmt Equipment Name Model Status Panel TSW-760 Offline Panel Webx Offline Dashboard AVF Log Version 5.6.0.467 © 2018 Crestron Electronics, Inc.

Add an A/V Switcher

A compatible A/V switcher must be added to the .AV Framework room before any other devices can be added or edited. .AV Framework for Crestron Virtual Control supports two types of A/V switchers:

  • Crestron auto-switcher devices (AM-200, AM-300, HD-MD-200-C-E, HD-MD-200-C-1G-E, HD-MD-300-C-E, HD-MD-400-C-E, and HDI-MD-400-C-2G-E)
    • Virtual switchers (via supported Crestron Connected displays or projectors)

NOTE: Only one A/V switcher can be added per room.

To add an A/V switcher to the .AV Framework room:

  1. Select Device Management from the Configure drop-down menu. The Device Management page is displayed.

Device Management Page
CRESTRON AV FRAMEWORK The system is currently online. Status- Configure- Users- Device Management Name Type Model Communication Status Action Panel Touch Screen TSW-760 IP ID: 03 Offline Panel Touch Screen Webx IP ID: 04 Offline Add Device System Device Mgmt A/V Routing Config Mgmt

  1. Click Add Device. The Add New Device dialog box is displayed.

Add New Device Dialog Box
Add New Device Device Type Device Type Display Name Display Name Model Model Save

  1. Enter the following information for the A/V switcher:

a. Select Switcher from the Device Type drop-down menu.
b. Enter a descriptive name for the switcher in the Display Name text field.
c. Select the switcher model from the Model drop-down menu.
d. For a Crestron auto-switcher device, enter the IP address of the switcher on the network in the IP text field.

  1. Click Save.

The A/V switcher is added to the list of devices on the Device Management page. Other devices can now be added to the room.

Device Management Page (Switcher Added)
CRESTRON AV FRAMEWORK The system is currently offline, Activate or Revert configuration. Status Configure Users Device Management Name Type Model Communication Status Action Panel Touch Screen TSW-760 IP ID: 03 Offline Panel Touch Screen Webx IP ID: 04 Offline AVSwitch Switcher HD-MD-300-C-E IP: 199.199.199.199 N/A Add Device System Device Mgmt A/V Routing Config Mgmt

If Crestron Virtual Switcher was selected for Model, a flat panel display or projector must be added to the room before any other device can be added.

The .AV Framework virtual switcher uses the input and output ports on the selected flat panel display or projector to route sources through the device.

To add a flat panel display or projector to the room:

  1. Click Add Device. The Add New Device dialog box is displayed.

Add New Device Dialog Box

Add New Device Device Type Device Type Display Name Display Name Model Model Save

  1. Enter the following information for the flat panel display or projector:

a. Select the appropriate device type (Flat Panel Display or Projector) from the Device Type drop-down menu.
b. Enter a descriptive name for the device in the Display Name text field.
c. Select the device model from the Model drop-down menu.
d. Enter any transport control, warm up/cool down, or authentication settings required for the device. For more information, refer to "Device Management" on page 38.

  1. Click Next. A dialog box is displayed indicating the device driver installation status and the device connection status.

Installing Display01 Dialog Box

Installing Display01 2:07:59 PM -- Initializing the Driver 2:07:59 PM -- Attempting to Connect to the Device Back Cancel Save

  1. Click Save.

The flat panel display or projector is added to the list of devices on the Device Management page. Other devices can now be added to the room.

Device Management Page (Virtual Switcher Added)

CRESTRON AV FRAMEWORK The system is currently offline, Activate or Revert configuration. Status Configure Users Device Management Name Type Model Communication Status Action Panel Touch Screen TSW-760 IP ID: 03 Offline Panel Touch Screen Webx IP ID: 04 Offline CVS Switcher Crestron Virtual Switcher N/A Display01 Flat Panel Display NEC MultiSync V IP: 192.192.192.192 Port: 7142 N/A ID: 5 Add Device System Device Mgmt A/V Routing Config Mgmt

NOTE: Drivers for flat panel displays and projectors are generic, and the device inputs provided in .AV Framework may not match the physical inputs on the device. If an unsupported input is selected in the touch screen user interface, the route may not be completed. Therefore, all unsupported inputs should be disabled on the Inputs/Outputs page. For more information, refer to "Inputs/Outputs" on page43.

Add New Devices

After adding an A/V switcher to the .AV Framework room, additional devices can be added to the room via wired and wireless connections to the A/V switcher and to the server. For more information, refer to "Appendix A: Interface Setup" on page 61.

To add devices to the .AV Framework room:

  1. Select Device Management from the Configure drop-down menu. The Device Management page is displayed.

Device Management Page (Switcher Added)

CRESTRON AV FRAMEWORK The system is currently offline, Activate or Revert configuration. Status- Configure- Users- Device Management Name Type Model Communication Statusakoaction Panel Touch Screen TSW-760 IP ID: 03 Offline Panel Touch Screen Webx IP ID: 04 Offline AVSwitch Switcher HD-MD-300-C-E IP: 199.199.199.199 N/A Add Device System Device Mgmt A/V Routing Config Mgmt

  1. Click Add Device. The Add New Device dialog box is displayed.

Add New Device Dialog Box

Add New Device Device Type Device Type Display Name Display Name Model Model Save

  1. Enter the following information for the device:

a. Select the appropriate device type from the Device Type drop-down menu.
b. Enter a descriptive name for the device in the Display Name text field.
c. Select the device model from the Model drop-down menu.
d. Enter any additional settings for the device in the appropriate fields (if required). For more information, refer to "Device Management" on page 38.

  1. Click Save.

The device is added to the list of devices on the Device Management page.

Device Management Page (Device Added)
CRESTRON AV FRAMEWORK The system is currently online. Status- Configure- Users- Device Management Name Type Model Communication Status Action Panel Touch Screen TSW-760 IP ID: 03 Offline Panel Touch Screen Webx IP ID: 04 Offline HD-MD Switcher HD-MD-300-C-E IP: 192.30.11.255 N/A AM-101 AirMedia® AM-101 IP ID: 05 N/A Add Device System Device Mgmt A/V Routing Config Mgmt

Configuration

Use the configuration utility to configure system settings, to add devices and an A/V switcher to the .AV Framework room, to configure the inputs and outputs of the A/V switcher, and to manage saved configurations.

The configuration utility also provides screens that display the system status and an activity log, as well as screens for adding and managing users.

The AV Framework Dashboard page is the default page that is displayed upon logging in, as shown in the image on the following page.

Use the drop-down menus on the top left of the screen to navigate the configuration utility. The menus are always visible on the top left of any of the configuration pages and provide the following selections.

- Status

- Dashboard

- AVF Log

- Configure

- System

- Device Management

- A/V Routing

- Configuration Management

- Users

- Manage

Click Sign Out on the top right of any page to sign out of the configuration utility.

Status Menu

The Status menu provides selections for viewing the status of the network, the connected A/V switcher, and other connected devices. The Status menu also provides access to the activity log.

Navigational controls are provided on the bottom of each status page:

- Select Dashboard to display the AV Framework Dashboard page.

- Select AVF Log to display the AVF Log page.

These menu selections are described in the sections that follow.

AV Framework Dashboard

Navigate to Status > Dashboard to display the AV Framework Dashboard page.

AVF Dashboard Page
CRESTRON AV FRAMEWORK The system is currently online. Status- Configure- Users- AV Framework Dashboard Ethernet Information Host Name: ubuntu IP Address: 172.30.16.62 Subnet Mask: 255.255.255.0 Default Router: 172.30.16.1 Switcher Information Model: HD-MD-300-C-E Input Channels Output Channels Channel Name Type Status Channel Name Type Status #1 HDMI 1 HDMI N/A #1 HDMI 1 HDMI N/A #2 HDMI 2 HDMI N/A #3 VGA 3 VGA N/A Equipment Name Model Status Panel TSW-760 Offline Panel Webx Offline HD-MD-300 HD-MD-300-C-E Offline Dashboard AVF Log

The AV Framework Dashboard page provides the following information.

Ethernet Information

The Ethernet Information section shows the hostname, the IP address, the subnet mask address, and the default router address of the Crestron Virtual Control server.

AV Framework Dashboard - Ethernet Information

Ethernet Information

Host Name:ubuntuIP Address:172.30.16.62
Subnet Mask:255.255.255.0Default Router:172.30.16.1

Switcher Information

The Switcher Information section shows the name and model of the connected A/V switcher, as well as the channel number and icon, the channel name, the channel type, and the channel status (Online, Offline, or N/A).

NOTE: A compatible A/V switcher must be added to the .AV Framework room before any switcher information is shown. For more information on adding an A/V switcher, refer to "Add an A/V Switcher" on page 14.

AV Framework Dashboard - Switcher Information

Switcher Information

Input ChannelsOutput Channels
ChannelNameTypeStatusChannelNameTypeStatus
#1Sony BDPHDMIN/A#1Samsung DMHDMIOnline
#2Oppo-103HDMIN/A
#3VGA 3VGAN/A

For more information on configuring input and output channels of the switcher device, refer to "Inputs/Outputs" on page 43.

The status for input and output channels indicates the following information:

- Online

  • Input: The source is sending content.
  • Output: The sync is receiving content.

- Offline

  • Input: The source is not sending content or is not present.
  • Output: The sync is not receiving content or is not present.

- N/A: The device status is not reported (shown for CEC-controlled displays, non-controlled displays, and IR-controlled devices).

Equipment

The Equipment section shows the name, model, and status (Online, Offline, or N/A) of any equipment connected to the .AV Framework room, including the A/V switcher.

AV Framework Dashboard - Equipment

Equipment

Name

Panel

Panel

HD-MD-300

Model

TSW-760

Webx

HD-MD-300-C-E

Status

Offline

Offline

Offline

For more information on connecting equipment to .AV Framework, refer to "Add New Devices" on page 18.

NOTE: Observe the following points when adding devices:

- A compatible switcher device must be added to the .AV Framework room before any other devices can be added. For more information, refer to "Add an A/V Switcher" on page 14.

- A TSW-760 touch screen and an XPanel virtual touch screen are added to new .AV Framework rooms by default. These devices can be deleted once an A/V switcher is added to the room.

- The XPanel virtual touch screen can be used to test the touch screen project through the .AV Framework program's built-in web XPanel interface. For more information, refer to "XPanel" on page 65

The status for connected equipment indicates the following information:

• Online: The device is detected and is providing feedback to .AV Framework.
- Offline: The device was detected at one point, but it is no longer detected by .AV Framework.
- N/A: The device status is not reported (shown for CEC-controlled displays, non-controlled displays, and IR-controlled devices).

AVF Log

Navigate to Status > AVF Log to display the AVF Log page.

AVF Log Page

CRESTRON AV FRAMEWORK The system is currently online. Status- Configure- Users- AVF Log <19e03ecd4ec3411bbd89d0b1d73944db>:0 at Crestron.SimplSharp.WebScripting.HttpCowsCookieCollection.Add (Crestron.SimplSharp.WebScripting.HttpCowsCookie cookie) [0x00073] in <3002ffb0d57a43bea28Bc8a52b6220f4>:0 at Crestron.SimplSharp.WebScripting.HttpCowsResponse.App=ndCookie (Crestron.SimplSharp.WebScripting.HttpCowsCookie cookie) [0x00079] in <3802ffb0d57a43bea28Bc8a52b6220f4>:0 at Crestron.SimplSharpFramework.Nvc.CWShttpContext.SendResponse (System.Byte[] asset, Syntom.String contentType, System.Object[] cookies, Net40.Tuple 2[System.String,System.String[] headerFields) [0x00092] in <81ff126ff8854b6167fc9cb991c3e5e5>:0 11:05:00 042653 :Info: (12) :AVF: Tick 11:06:12 053290 :Info: (44) :LM: Secure store returned empty or null. key:SfbPassword 11:08:12 053302 :Info: (44) :LM: Secure store returned empty or null. key:SfbPassword2 11:08:12 053310 :Info: (44) :LM: Secure store returned empty or null. key:LdapPassword 11:08:12 053317 :Info: (44) :LM: Secure store returned empty or null. key:xyzzy Stop Scrolling Download Dashboard AVF Log

Use the AVF Log page to display the event log for .AV Framework. Event logs are recorded at a set interval and can be viewed and downloaded from this page.

  • Select Stop Scrolling to prevent the activity log from automatically scrolling. Select Scrolling to resume scrolling if Stop Scrolling is selected.
  • Select Download to download the activity log to the host computer as a text file.

Configure Menu

The Configure menu provides selections for configuring system settings,

Crestron Fusion software connection settings, relay behavior settings, custom logos, and device drivers.

The Configure menu also provides selections for adding devices to the .AV Framework room, for configuring the input and output channels of the connected A/V switcher, and for managing configuration settings.

Navigational controls are provided on the bottom of each configuration page:

  • Select System to display the System Setup page.
  • Select Device Mgmt to display the Device Management page.
  • Select A/V Routing to display the Inputs/Outputs page.
  • Select Config Mgmt to display the Manage Configuration page.

These menu selections are described in the sections that follow.

If any changes are made to the .AV Framework system settings from, the Configure menu, a warning message is displayed.

Warning Message

Warning Any saved changes will place the system offline. You/User must activate new configuration to bring the system online. Click OK to proceed. OK Cancel

Click OK to save the changes or Cancel to cancel changes. Once changes are saved, the green status bar on the top of the page turns red and shows a "The system is currently offline, activate or revert configuration" message.

System Offline Message

The system is currently offline, Activate or Revert configuration.

This dialogue is normal, but the .AV Framework configuration must be activated before the system comes back online. Click Activate to activate any saved changes or click Revert to revert the system back to the previous configuration. For more information, refer to page 44.

System Setup

Navigate to Configure > System to display the System Setup page.

System Setup Page
CRESTRON AV FRAMEWORK The system is currently online. Status• Configure• Users• System Setup System Crestron Fusion Relay Touch Screen Custom Graphics Drivers Room Name Conference01 Language English (English) Time Format 12 hour Data Format January 15, 2017 Synchronize Room Name with VC-4 Save System Device Mgmt A/V Routing Config Mgmt

The system setup page provides tabs for configuring the .AV Framework system settings, Crestron Fusion settings, relay commands, custom graphics, and device drivers.

System

Click the System tab to display the System settings.

System Setup - System
System Setup System Crestron Fusion Relay Touch Screen Custom Graphics Drivers Room Name Conference01 Language English (English) Time Format 12 hour Data Format January 15, 2017 Synchronize Room Name with VC-4 Save

Use the System settings to configure general settings for .AV Framework.

• Room Name: Enter a name for the room associated with the system.

- Language: Use the drop-down menu to select the language displayed by .AV Framework.

- Time Format: Use the drop-down menu to select between 12-hour and 24-hour format for displaying time.

- Date Format: Use the drop-down menu to select a format for displaying the date.

- Synchronize Room Name with VC-4: Toggle the switch to enable or disable synchronizing the .AV Framework room name with the Crestron Virtual Control room name. If enabled, the room name will update in both locations after the room is stopped and restarted in the Crestron Virtual Control web interface.

NOTE: When an existing configuration is upgraded or uploaded, room name sync is disabled by the software and must be manually enabled afterwards.

Click Save to save the current settings.

Crestron Fusion

Click the Crestron Fusion tab to display the Crestron Fusion settings.

System Setup - Crestron Fusion

System Setup System Crestron Fusion Relay Touch Screen Custom Graphics Drivers Crestron Fusion Room Name AVFRoom1 IPID 30 Enable Crestron Fusion Scheduling Show Broadcast Message On Touch Screen Emergency Message Timeout 90 Minutes Non-Emergency Message Timeout 720 Minutes Save Disable

Use the Crestron Fusion settings to set up a connection between a Crestron Fusion account and .AV Framework.

NOTE: The Crestron Fusion server URL is set through the System Setup section of the Crestron Virtual Control web interface. For more information, refer to the embedded Crestron Virtual Control help file.

  • Crestron Fusion Room Name: Enter the room name in Crestron Fusion associated with the Crestron Virtual Control server.
    • IPID: Enter the IP ID of the selected Crestron Fusion room.
  • Enable Crestron Fusion Scheduling: Use the drop-down menu to enable or disable Crestron Fusion scheduling for .AV Framework.
  • Show Broadcast Message on Touch Screen: Toggle the switch on or off to enable or disable showing broadcast messages from Crestron Fusion on a connected touch screen.
  • Emergency Message Timeout: Enter the time, in minutes, it takes for an emergency broadcast from the Crestron Fusion server to time out.
  • Non-Emergency Message Timeout: Enter the time, in minutes, it takes for a non-emergency broadcast from the Crestron Fusion server to time out.

For more information about connecting .AV Framework to Crestron Fusion, refer to page 71.

NOTE: .AV Framework for Crestron Virtual Control supports only inbound communications for connecting to a Crestron Fusion Cloud server. Traditional (outbound) communications for connecting to an on-premises server are not supported.

Click Save to save the current settings. Click Enable to enable a connection to Crestron Fusion. Click Disable to disable the connection.

Relay

Click the Relay tab to display the Relay settings.

System Setup - Relay

System Setup System Crestron Fusion Relay Touch Screen Custom Graphics Drivers Relay Name Relay Device & Identifier Relay Behavior Timing Screen 1 Controller_1_2_Relay Momentary 1 Seconds Relays are configured in pairs on the selected device. The first relay in all the relay pairs will bring the SCREEN UP. The second relay in all the relay pairs will bring the SCREEN DOWN. Save

Use the Relay settings to select a relay behavior for connected video display sources, such as a projector. A relay device must be added to the system to view these settings.

- Relay Name: Enter a name for the relay.

- Relay Device & Identifier: Use the drop-down menu to select a relay pair from the available configured devices.

NOTE: A specific device relay pair can have only one saved configuration.

- Relay Behavior: Use the drop-down menu to select one of the following relay behaviors for the chosen relay pair:

- Momentary: The chosen video source is set (turned on) or reset (turned off) by a relay command and remains in the selected state for the duration specified in the Timing field.

- Latching: The chosen video source is set (turned on) or reset (turned off) by a relay command and remains in the selected state until an inverse relay command is sent.

- Disable: Relay behavior is disabled for the chosen video source.

- Timing: If Momentary is selected for Relay Behavior, enter the duration in seconds that the video source remains in a specified state following a relay command.

Click Save to save the current settings. Click Enable to enable the relay settings. Click Disable to disable the relay settings.

Touch Screen Custom Graphics

Click the Touch Screen Custom Graphics tab to display the Touch Screen Custom Graphics settings.

System Setup - Touch Screen Custom Graphics

System Setup System Crestron Fusion Relay Touch Screen Custom Graphics Drivers Enable Custom Logo Graphic Custom Logo Graphic URL Optimal logo size is 800 x 600 pixels. Supported Image Formats: BMP, JPG, PNG. Enable Touch Screen Screensaver Enable Start Button Start Button Text START Enable Custom Screensaver Backgrounds When enabled at least 1 background is required. Add Custom Screensaver Background URL Optimal logo size is 800 x 600 pixels. Supported Image Formats: BMP, JPG, PNG. Interval Between Backgrounds 30 Seconds Touch Screen Screensaver Sleep Time 600 Seconds Touch Screen Screensaver Start Time 06:00 AM Touch Screen Screensaver End Time 06:00 PM Enable Touch Screen Auto Update Enable Custom Help Page Custom Help Page URL Optimal logo size is 800 x 600 pixels. Supported Image Formats: BMP, JPG, PNG. Save

Use the Touch Screen Custom Graphics settings to enable or disable a custom logo graphic, to enable or disable a custom touch screen screensaver, and to select custom screensaver backgrounds for a connected touch screen:

- Enable Custom Logo Graphic: Toggle the switch to enable or disable setting a custom logo graphic for the touch screen project. Custom logo graphics can be set only if .AV Framework is not connected to Crestron Fusion.

- Custom Logo Graphic URL: If Enable Custom Logo Graphic is selected, enter the URL of the desired custom logo graphic source file.

NOTES:

- .AV Framework allocates an area of 800 x 600 pixels for the custom logo graphic. Custom graphics larger than 800 x 600 pixels are not accepted and must be scaled down manually. Custom graphics smaller than 80 x 600 pixels are not scaled up, so these graphics should be resized for timal image quality.

- Supported custom graphic file types are BMP, JPG, and PNG.

- Enable Touch Screen Screensaver: Toggle the switch to enable or disable a touch screen screensaver for the touch screen project.

- Enable Start Button: If Enable Touch Screen Screensaver is enabled and if .AV Framework is not connected to a scheduling calendar, toggle the switch to enable or disable adding a START button to the touch screen project.

NOTE: The START button is used to switch to the system's default route for systems that are not connected to a scheduling calendar. For more information, refer to "Home Screen Overview" on page 50.

- Start Button Text: If Enable Start Button is enabled, enter the text that is displayed on the Start button in the touch screen project.

- Enable Custom Screensaver Backgrounds: If Enable Touch Screen Screensaver is selected, toggle the switch on or off to enable or disable custom background graphics for the touch screen screensaver.

- Add Custom Screensaver Background URL: If Enable Custom Screensaver Backgrounds is selected, enter the URL of the desired custom background image source file.

NOTE: Observe the following points when choosing a custom background image source file:

  • Up to 15 custom background URLs can be added. Select the plus (+) button next to a text field to add a new background URL once the URL has been entered. Select the minus (-) button next to an existing background URL to delete the URL. At least one background is required if Enable Custom Screensaver Backgrounds is enabled.
  • .AV Framework allocates an area of 800 x 600 pixels for the custom screensaver background graphic. Custom graphics larger than 800 x 600 pixels are not accepted and must be scaled down manually. Custom graphics smaller than 800 x 600 pixels are not scaled up, so these graphics should be resized for optimal image quality.
  • Supported custom graphic file types are BMP, JPG, and PNG.

  • Interval Between Backgrounds: Enter the duration in seconds that a background image is displayed on the screensaver before switching to the next image.

  • Touch Screen Screensaver Sleep Time: Enter the time in seconds that the touch screen must be idle before the screensaver is activated.
  • Touch Screen Screensaver Start Time: Enter the time of day in 24-hour format when the screensaver becomes active.
  • Touch Screen Screensaver End Time: Enter the time of day in 24-hour format when the screensaver becomes inactive.
  • Enable Touch Screen Auto Update: Toggle the switch to enable or disable automatic updates for the .AV Framework .vtz project file on a supported touch screen. Touch screen automatic updates behave as follows:

  • If an .AV Framework .vtz project file has not been previously loaded to the touch screen, the auto update mechanism downloads the latest .vtz file and loads it to the touch screen. The existing project file on the touch screen is overwritten.

  • If an .AV Framework .vtz project file has been previously loaded to the touch screen, the auto update mechanism updates the project file only if the hash file on the touch screen is different from the hash on the remote server or cloud.

- Enable Custom Help Page: Toggle the switch to enable or disable using a custom help page graphic in the touch screen project. When enabled, the uploaded custom graphic image replaces the default help overlay when the onscreen Help button is tapped.

- Custom Help Page URL: If Enable Custom Help Page is selected, enter the URL of the desired custom help graphic source file.

NOTES:

- .AV Framework allocates an area of 800 x 600 pixels for the custom help file graphic. Custom graphics larger than 800 x 600 pixels are not accepted and must be scaled down manually. Custom graphics smaller than 800 x 600 pixels are not scaled up, so these graphics should be sized for optimal image quality.

• Supported custom graphic file types are BMP, JPG, and PNG.

Click Save to save the current settings.

Drivers

Click the Drivers tab to display the Drivers settings

System Setup - Drivers

System Setup
SystemCrestron FusionRelayTouch Screen Custom GraphicsDrivers
SearchImport
ManufacturerSupported SeriesDevice TypeCommunicationDriver VersionEnable Driver
NECNEC MultiSync P NEC MultiSync V NEC MultiSync XFlat Panel DisplayIP2.01.003.0213
NECNEC MultiSync P NEC MultiSync V NEC MultiSync XFlat Panel DisplaySerial2.01.003.0213
NECMultisync SeriesFlat Panel DisplayIR2.01.003.0106
PanasonicPanasonic TH SeriesFlat Panel DisplaySerial2.01.003.0213
SamsungSamsung DM SeriesFlat Panel DisplayIP2.01.002.0233
SamsungSamsung DM SeriesFlat Panel DisplaySerial2.00.010.0152
SamsungDM SeriesFlat Panel DisplayIR2.01.003.0106
SamsungSamsung ME SeriesFlat Panel DisplaySerial2.00.010.0152
SharpSharp LC SeriesFlat Panel DisplayIP2.00.010.0152
SharpSharp LC SeriesFlat Panel DisplaySerial2.00.010.0152

Use the Drivers settings to manage and to add device drivers to .AV Framework. Various drivers are added to new .AV Framework rooms and are enabled by default.

The image above shows examples of drivers for NEC® MultiSync® displays, Panasonic® displays, Samsung® displays, and Sharp® displays. Device drivers are displayed in table format.

The following information is available for each installed driver:

• Manufacturer: The device manufacturer
• Supported Series: The model series supported by the driver
• Device Type: The device type (such as flat panel display or projector)
- Communication: The communication method used by the device (such as IR, CEC, or serial)
- Driver Version: The installed driver version

Each driver also has an Enable Driver switch that is used to enable or disable the driver in .AV Framework.

The following navigational controls are provided:

  • Navigate through the available device drivers by clicking a page number on the bottom left of the page. (Click the left or right carets [« or »] to move forward or backward when there are more than four pages.)
  • Click one of the numbers on the bottom right of the page (10, 25, 50, or 100) to display up to that number of drivers on a single page.
  • Click the Search button to open the Crestron Certified Drivers web portal (https://drivers.crestron.io) in a new browser window. After logging in, use the Driver Search tab to locate and download specific device drivers.

NOTE: New users to the Crestron Certified Drivers web portal must create an account in order to search for and download device drivers.

Additional device drivers can be downloaded from the Crestron Certified Drivers web portal and loaded into .AV Framework to expand the number of compatible third-party devices. New device drivers are added to the Crestron Certified Drivers web portal after they are certified.

NOTE: Custom device drivers can also be created and loaded into .AV Framework. For more information and detailed developer instructions, refer to the Crestron Certified Drivers SDK website at http://developer.crestron.com.

To import device drivers into .AV Framework with the web configuration utility:

  1. Log in to the Crestron Certified Drivers web portal. The Driver Search page is displayed.

Crestron Certified Drivers Portal Driver Search Page
Driver Search Global Filter Reset Manufacturer Type Choose Communication Choose Supported Models Version DirectTV Cable Box IR DirecTv 2.00.009.0011 More Epson Projector Serial PowerLite 2140W... 2.00.009.0011 More LG Bluray Player IR LG BD Series 2.00.009.0011 More NEC Flat Panel Display IP Multisync V323... 2.00.009.0011 More NEC Flat Panel Display Serial Multisync V323... 2.00.009.0011 More NEC Flat Panel Display IR Multisync 2.00.009.0011 More Panasonic Flat Panel Display Serial TH42PF30U... 2.00.009.0011 More Roku Video Server IP Roku... 2.00.009.0011 More Roku Video Server IR Roku 2.00.009.0011 More Samsung Bluray Player IR Samsung BD Series 2.00.009.0011 More Download Drivers

  1. Use the following options to navigate the Crestron Certified Drivers web portal:

  2. Type a manufacturer name, device type, communication method, or supported model in the Global Filter text box to filter drivers based on that search term.

  3. Type a search term in the text box or use the drop-down menu underneath a column heading to filter drivers by the driver information shown in that column. Use the up and down arrows next to the column header to sort the information in that column in alphabetical or reverse alphabetical order, respectively.
  4. Navigate through the available device drivers by clicking a page number or by using the left and right arrows at the bottom of the page.

NOTE: Click More next to a driver name to view additional information about that driver. Drivers can also be downloaded individually from this page.

  1. Select the device driver(s) by clicking the check box to the left of a driver name.
  2. Once all drivers have been selected, click Download Drivers to download the drivers to the host computer. All selected drivers download as .pkg files within a single zipped file.
  3. Navigate to System > Drivers in the .AV Framework configuration utility.
  4. Click Import at the top right of the page.
  5. Select the .zip file containing the driver .pkg files and click Open.

If the driver(s) are uploaded successfully, a notification is displayed indicating that the installation was successful.

CAUTION: Do not activate the new configuration until the notification is displayed indicating that the drivers were loaded successfully. This notification can take several minutes to display if many drivers are uploaded in the same .zip file.

Driver Load Success Message

Driver Load Success The Device Driver(s) have been loaded to the system. Please see the system notification for the driver status. Close

After the upload completes, a System Notification icon is displayed under the system status message bar.

System Notification Message

The system is currently offline, Activate or Revert configuration. System Notification

Click the System Notification icon to open a dialog box that shows the driver manufacturer, model, type, and installation status. The following image shows the installation status of a Sony® XBR7 Series flat panel display.

System Notification Dialog Box

System Notification Manufacturer Model Type Status Description Sony XBR7 Series Flat Panel Display Driver installed successfully Close

  • If the driver upload is successful, the Status column shows a "Driver installed successfully" message.
  • If the driver fails to upload, the Status column shows a "Driver failed to install" message. Ensure that the correct file was selected and that the Crestron Virtual Control server is functioning properly. If the driver installation continues to fail, contact Crestron customer service for assistance.

Device Management

Navigate to Configure > Device Management to display the Device Management page.

Device Management Page
CRESTRON AV FRAMEWORK The system is currently online. Status- Configure- Users- Device Management Name Type Model Communication Status Action Panel Touch Screen TSW-760 IP ID: 03 Offline XPanel Touch Screen Webx IP ID: 04 Offline MP-B20 Button Panel MP-B20 IPID IP ID: 08 N/A HD-MD-400 Switcher HD-MD-400-C-E IP: 172.30.19.255 N/A Projector1 Projector Crestron Connected Projector IP ID: 05 N/A Add Device System Device Mgmt A/V Routing Config Mgmt

Use the Device Management page to add a device to the .AV Framework room, to view information about connected devices, and to edit or remove a device.

Observe the following points when managing devices in .AV Framework:

  • Certain device classes limit the number of devices that can be added to the system. Once the maximum number of devices have been added to the system, the device class can no longer be selected from the Device Type drop-down menu unless one of its devices is deleted.
  • Before a device can be added to .AV Framework, the chosen device must be connected to the connected A/V switcher. For more information, refer to "Appendix A: Interface Setup" on page 61.
  • Be sure to select the correct device type and model when adding a device via an IP connection, and confirm that the IP ID is assigned to the correct IP device.
  • If an AM-300 is selected as the A/V switcher, supported DM® endpoints can be added to the system via an IP ID. Any endpoints should be added prior to adding other devices. Once an endpoint is added, its communication ports are available as additional selections for device transport and control. For a list of supported DM endpoints, refer to "Appendix B: Device Configuration" on page 78.

Add Devices

  1. Click Add Device to add a new device to the .AV Framework room. The Add New Device dialog box opens.

NOTE: For new installations, a compatible switcher device must be added to the system before any other devices can be added. For more information, refer to "Add an A/V Switcher" on page 14.

Add New Device Dialog Box

Add New Device Device Type Device Type Display Name Display Name Model Model Save

  1. Enter the following information for the chosen device.

  2. Device Type: Use the drop-down menu to select the device type from the available options.

  3. Display Name: Enter a name for the device in the text field.
  4. Model: Use the drop-down menu to select the model of the chosen device from the available options.

NOTE: Certain device types and models require additional information to be entered (such as setting transport control details). Additional drop-down menus and text fields are provided when these device types and/or models are selected. For a complete list of additional fields, refer to "Appendix B: Add New Device Additional Fields" on page 78.

  1. Once the required device information is entered, click Save to add the device or click the x button to close the dialog box and to discard any changes.

Adding CEC and Crestron Connected Devices

After a CEC-controlled device or a Crestron Connected ® device is added, a notice is displayed. The notice for CEC drivers is shown on the following page as an example.

Generic CEC Driver Notice

Generic CEC Driver Notice

Generic CEC is a universal driver provided by Crestron that works with a wide variety of flat panel displays. The specific functionality supported by your device is dependent on the how the CEC specification has been implemented by the device's manufacturer as the CEC specification does not require device manufacturer to implement the entire command set. For a device specific driver, please visit: https://drivers.crestron.io. For more information please contact Crestron True Blue Support at support@crestron.com

Acknowledge

Click Acknowledge to return to the Device Management page.

Adding Flat Panel Displays and Projectors

Flat panel displays and projectors require their drivers to be added to .AV Framework before the device can be selected and added to the system. For more information on adding device drivers, refer to "Drivers," starting on page 34.

NOTE: Certain device drivers require a username and password to initiate control communications. Additional User Name and Password fields are provided in the Add New Device dialog box for these devices. These fields are required or optional depending on the device driver.

After the appropriate driver is added to .AV Framework, use the drop-down menus in the Add New Device dialog box to select the device. Enter the required information for the device, and then click Save.

A dialog box showing the driver installation status is displayed. If the device driver requires a username and password, the dialog box also shows the driver authentication status.

Installing XBR7-1 Dialog Box

Installing XBR7-1 1:45:18 PM -- Initializing the Driver 1:45:22 PM -- Attempting to Connect to the Device 1:45:23 PM -- Device is Online Back Cancel Save

Click Back to return to the Add New Device dialog box. Click Cancel to cancel installing the device driver. Click Save to save the device and return to the Device Management page.

Edit Devices

After a device is added to .AV Framework, it appears in the list of devices on the Device Management page. The display name, device type, device model, transport details, and device status are provided for each device.

  1. Click the pencil button 📋 next to a device to edit the device. The Edit Device dialog box opens.

Devices Page - Edit Device Dialog Box

Edit Device Device Type Touch Screen Model TSW-760 Display Name TSW-760-1 IP ID 07 Save

  1. Use the Edit Device dialog box to edit the display name, transport details, and any other device settings provided for the chosen device.
  2. Click Save to save any changes or click the x button to close the dialog box and to discard any changes.

Editing Flat Panel Displays and Projectors

For flat panel displays and projectors with installed device drivers, a dialog box showing the updated device status is displayed after changes are saved.

Updating XBR7-1 Dialog Box

Updating XBR7-1 4:18:19 PM -- Sending Power On Command 6:58:15 PM -- Attempting to Connect to the Device 6:58:16 PM -- Sending Power On Command 6:58:16 PM -- Device is Online 6:58:33 PM -- Sending Power Off Command 7:34:58 PM -- Attempting to Connect to the Device 7:34:59 PM -- Sending Power Off Command 7:34:59 PM -- Device is Online Back Test Save

  • Click Back to return to the Edit Device dialog box.
  • Click Test to display a dialog box for sending test commands to the device. For more information, refer to "Test Devices" below.
  • Click Save to save the device and return to the Device Management page.

Test Devices

  1. Click the paper and clipboard button 📋 next to a flat panel display or a projector to send test commands to the device. A dialog box showing the driver test status is displayed.

Testing XBR7-1 Dialog Box

Testing XBR7-1 1:55:31 PM -- Attempting to Connect to the Device 1:55:31 PM -- Device is Online 1:55:31 PM -- Sending Power Off Command 4:18:19 PM -- Sending Power On Command 6:58:15 PM -- Attempting to Connect to the Device 6:58:16 PM -- Sending Power On Command 6:58:16 PM -- Device is Online 6:58:33 PM -- Sending Power Off Command Send Command Power Off Send

  1. To send test commands to the device, select a command from the Send Command drop-down menu, and then click Send .AV Framework attempts to send the chosen command to the device.

NOTE: The configuration utility does not provide feedback to confirm if the command was sent successfully. Verify the command is received on the device.

Delete Devices

  1. Click the trash can button 📄 next to a device.

  2. A warning message is displayed. Click OK to delete the device or Cancel to cancel the deletion.

Inputs/Outputs

Navigate to Configure > A/V Routing to display the Input/Outputs page.

Inputs/Outputs Page
CRESTRON AV FRAMEWORK The system is currently online. Status - Configure - Users - Inputs Channel Type Icon Enabled Display Name Rank Device #1 HDMI Icon Yes AM-101 1 Device #2 HDMI Icon Yes Roku3 2 Roku3 #3 HDMI Icon Yes TiVo 3 TiVo #4 VGA Icon Yes VGA 4 4 Device Outputs Channel Type Icon Enabled Display Name #1 HDMI Icon Yes NEC IP Save System Device Mgmt A/V Routing Config Mgmt

Use the Inputs/Outputs page to configure the input and output channels of the connected switcher device.

The following information can be viewed and configured for each input and output channel unless otherwise noted.

- Channel: This column shows the number of the input or output channel on the switcher device and the chosen icon for that channel.

- Type: This column shows the type of input or output channel (such as HDMI® input or VGA).

- Icon: Use the drop-down menu to select an icon for the channel.

- Enabled: Use the drop-down menu to enable or disable the channel on the .AV Framework system.

• Display Name: Enter the display name of the device connected to the channel.

- Rank (Inputs Only): Use the drop-down menu to select a number to determine the order that the input displays appear when selecting a source to present from the touch screen user interface.

- Device (Inputs Only): Use the drop-down menu to select the device connected to the channel. (For more information on adding devices to .AV Framework, refer to page 39.)

Manage Configuration

Navigate to Configure > Configuration Management to display the Manage Configurations page.

Manage Configurations Page

CRESTRON AV FRAMEWORK The system is currently online Status- Configure- Users- Manage Configuration Activate Configuration Revert Configuration Backup/Restore Download Configuration Upload Configuration System Device Mgmt DMPS Config Config Mgmt

Use the Manage Configurations page to activate new configuration settings or to revert to a prior configuration. The Manage Configurations page also provides controls to download and upload configuration files.

If saved changes have been made to the configuration, click Activate Configuration to activate the new configuration settings or click Revert Configuration to revert to the previous configuration.

The touch screen user interface shows a configuration in progress message.

Configuration in Progress Screen

Crestron VC-4-ROOM-1-49 - Configuration in Progress Screen - 1

.AV Framework TM

Crestron VC-4-ROOM-1-49 - Configuration in Progress Screen - 2

System configuration in progress.

Please activate the configuration from the system website to enable the system.

NOTE: If any changes are saved while configuring .AV Framework, the green status bar on the top of the screen turns red and shows a "The system is currently offline, activate or revert configuration" message. Once this message is displayed, any connected devices go offline and cannot be used, and changes must be activated for the devices to go back online. Once the configuration is activated, the status bar turns green and shows a "The system is currently online" message.

Click Download Configuration to download the current configuration settings as a .zip file. The downloaded .zip file includes XML files that contain the current configuration settings and any device driver files that are loaded in .AV Framework.

Click Upload Configuration to upload saved configuration files to the configuration utility. Saved configuration files can be used to configure similar rooms by uploading the configuration files to the corresponding .AV Framework systems.

An Upload Configuration dialog box is displayed.

Upload Configuration Dialog Box

Upload Configuration

"AVF_23015.zip"

If you are restoring an old configuration for an existing room that already exists in your Fusion environment, select "Restore". If, however, you are importing a configuration as a starting point for a new room, select "Create Room".

Restore

Create Room

OK

Cancel

The Upload Configuration dialog box provides options for modifying the Crestron Fusion room information that is paired with the configuration:

  • Click the Restore radio button to restore the Crestron Fusion room settings that exist in the configuration files.
  • Click the Create Room radio button to create a new Crestron Fusion room using the imported configuration settings. Enter the room name in the Crestron Fusion Room Name text field that is displayed.

Click OK to import the configuration files with the selected Crestron Fusion room settings or click Cancel to cancel the import.

Users Menu

The Users menu provides a selection for adding, editing, and deleting users in the .AV Framework system.

Navigate to Users > Manage to display the Manage Users page.

Manage Users Page
CRESTRON AV FRAMEWORK The system is currently online. Status• Configure• Users• Manage Users Username Surname Given Name Password Action admin Admin Crestron statistically Create User

Use the Manage Users page to manage, add, and edit .AV Framework users. The following information is provided for each user:

- Username: The username created for the user

NOTE: The administrative account for .AV Framework is specified by the username "admin." This username cannot be changed.

• Surname: The user's last name
• Given Name: The user's first name
• Password: A string of asterisks indicating that a password has been entered

An action button is also provided for each user in the Action column of the user table. Click this button to edit the username, surname, given name, and password for a user.

To create a new user:

  1. Click Create User at the bottom right of the dialog box. A new row appears in the users table.
  2. Enter the appropriate information for that user in the various text fields.
  3. Click the check √ button in the Action column to save the new user. Click the x button at any time during this process to cancel creating a new user.

To delete a user:

  1. Click the trashcan button 📄 in the Action column for that user. A warning message is displayed.
  2. Click OK to delete the user or Cancel to cancel the deletion.

NOTE: The "admin" account cannot be deleted.

Operation

The .AV Framework touch screen user interface provides a collection of room scheduling and BYOD (bring your own device) presentation capabilities. The various screens that comprise the user interface are described in the sections that follow.

Display Overview

Each screen in the .AV Framework touch screen project provides the following features:

  • A status bar that provides the room name and the time and date (set using the web-based configuration utility).
  • A square status icon next to the room name that turns red when the room is reserved and blue if the room is available (if room scheduling is enabled).
  • A footer bar that provides buttons for navigating and controlling the system volume (if supported by the display device or the external amplifier).

The following image shows a typical home screen (the project's default page) with the status bar and footer bar.

Home Screen (Room Available) - Status and Footer Bars

6HQ-2511 2:47 PM July 25, 2017 AVAILABLE FOR NEXT 13 MINUTES NEXT UP: Project Plan Review ihammons 3:00 PM - 3:30 PM RESERVE NOW > ⑦ Help

The footer bar provides the same buttons regardless of which screen is selected. Refer to the following tables for more information on footer button functionality.

Navigation Buttons

Crestron VC-4-ROOM-1-49 - Display Overview - 2

Crestron VC-4-ROOM-1-49 - Display Overview - 3

The home button navigates to the home screen.

The present button navigates to the present screen.

Volume Control Buttons

The microphone button mutes or unmutes the device microphone.
The mute button mutes or unmutes the device volume.
The volume lower button lowers the device volume incrementally.
The volume raise button raises the device volume incrementally.

NOTE: The volume control buttons and the volume bar are visible only if an external amplifier is enabled and connected to the .AV Framework room (set using the web-based configuration utility) or if the display device output supports volume control. For more information, refer to "System" on page 26.

Home Screen Overview

The home screen is the default screen of the touch screen project. The home screen indicates whether the associated room is either available or reserved for meetings (if .AV Framework is connected to a scheduling calendar):

  • If the room is available, the home screen allows an ad hoc meeting to be reserved from the touch screen.
  • If the room is reserved, the home screen shows current meeting information and the time remaining in the meeting.

If .AV Framework is not connected to a scheduling calendar, the home screen shows a custom logo (if enabled) or the date and time and provides a button that is used to switch to the system's default route.

The home screen may be accessed at any time by touching the home (A) button on the footer bar.

No Scheduling Calendar Connected

If .AV Framework is not connected to a scheduling calendar, the home screen provides the following information:

• A custom logo (if enabled through the configuration utility)
• The time and date (if no custom logo is enabled)
- A START button that switches to the system's default route automatically (For more information on setting the system's default route, refer to "Inputs/Outputs" on page 43.)

NOTE: The START button text can be customized using the configuration utility. For more information, refer to "Touch Screen Custom Graphics" on page 30.

- A Help button that can be tapped to provide an overlay with more information on the functions and controls of this screen

The image on the following page shows a typical home screen when .AV Framework is not connected to a scheduling calendar.

Home Screen (No Scheduling Calendar Connected)

6HQ-2511 3:24 PM March 12, 2018 3:24 March 12, 2018 START > Help

NOTE: If a custom help page image has been configured for the touch screen project, it will be displayed instead of the default help overlay when the Help button is tapped. For more information, refer to "Touch Screen Custom Graphics" on page 30.

Room Available

If .AV Framework is connected to a scheduling calendar and the room is available, the home screen provides the following information:

• The time remaining (in minutes) until the next scheduled meeting occurs
• The name, organizer, and duration of the next scheduled meeting
- A RESERVE NOW button that allows an ad hoc meeting to be scheduled through the touch screen
• A Help button that provides more information on the functions of this screen

The image below shows a typical home screen when the room is available.

Home Screen (Room Available)

6HQ-2511 2:47 PM July 25, 2017 AVAILABLE FOR NEXT 13 MINUTES NEXT UP: Project Plan Review ihammons 3:00 PM - 3:30 PM RESERVE NOW > ① Help

If the room is available for the rest of the day, the home screen provides the following information:

  • A RESERVE NOW button that allows an ad hoc meeting to be scheduled through the touch screen
    • A Help button that provides more information on the functions of this screen

The image below shows a typical home screen when the room is available for the rest of the day.

Home Screen (Room Available for the Rest of the Day)

6HQ-2511 2:14 PM July 25, 2017 AVAILABLE FOR THE REST OF THE DAY RESERVE NOW > Help

Room Reserved

If the room is not available, the home screen provides the following information:

• The time remaining (in minutes) until the current meeting ends
• The name, organizer, and duration of the current meeting
• The duration and name of the next scheduled meeting
• A Help button that provides more information on the functions of this screen

The image on the following page shows a typical home screen when the room is reserved.

Home Screen (Room Reserved)

6HQ-2511 2:41 PM July 25, 2017 RESERVED FOR NEXT 34 MINUTES Weekly Status Meeting 6HQ-2511 2:30 PM - 3:15 PM Help

Reserve a Meeting from the Home Screen

Use the following procedure to reserve an ad hoc meeting from the home screen when the room is available:

  1. Tap RESERVE NOW on the home screen. The new meeting screen is displayed.

New Meeting Screen
6HQ-2511 2:50 PM July 25, 2017 New Meeting Starts 2:50 PM 3:15 PM Ends 3:30 PM 3:45 PM RESERVE NOW

  1. Tap one of the available meeting end times to set the duration of the meeting. The room can be reserved for up to three lengths:

  2. Until the current half hour interval ends (If the current time is 10:17AM, the end time for this option is 10:30AM.)

  3. Until the current half hour interval ends plus 30 minutes (If the current time is 10:17AM, the end time for this option is 11:00AM.)
  4. Until the current half hour interval ends plus 60 minutes (If the current time is 10:17AM, the end time for this option is 11:30AM.)

NOTE: These options are available only if a meeting is not already scheduled during that timeframe.

  1. Tap RESERVE NOW to reserve the meeting.

To discard the reservation, tap the x button on the top right of the screen.

Access the System Info Screen

To access the System Info screen, tap and hold the Help button on the home screen for 20 seconds.

The System Info screen provides the device IP address, the device hostname, the Crestron Fusion server connection status, the Crestron Fusion room name, and the device MAC address.

System Info Screen

System Info IP Address: 172.30.16.62 Host Name: ubuntu Crestron Fusion Server Connection: Offline Crestron Fusion Room Name: 6HQ-2511 MAC Address: 00:0c:29:66:f5:f2

To exit the System Info screen and return to the home screen, tap the x button on the top right of the screen.

Present a Source Screen Overview

The Present a Source screen allows content to be routed from a connected device to the main display in the room.

The Present a Source screen appears as shown in the following image.

Present a Source Screen
6HQ-2511 12:53 PM July 27, 2017 Present a Source AirMedia Laptop Blu-ray Cable TV Stop

Select one of the available presentation options to route the selected source to the main display. The source is controlled directly through the touch screen project.

- Each available source has a green or red icon in the top right corner of its background tile.

  • A green icon indicates that video signal is present for that source
  • A red icon indicates that video signal is not present.

- If a source is active, the source's background tile turns blue, and a Stop button is shown. Tap the Stop button to stop routing the source to the display.

- If one source is enabled for presentation, the control page for that source loads automatically when the Present a Source screen is accessed.

Now Presenting Screen - HDMI Source

When a source connected by HDMI (such as a laptop) is selected, the following screen is displayed.

Present Screen - HDMI Source

6HQ-2511 11:21 AM July 27, 2017 < Back Now Presenting Stop Laptop playing source via HDMI

The Now Presenting screen for HDMI provides the input name and connection type. The circle icon in the center of the screen turns green if the source is connected and turns red if the source is disconnected.

Tap Stop on the top right of the screen to disconnect from the HDMI source.

Tap BACK to return to the Present a Source screen. Pressing BACK does not disconnect the source.

Connect to AirMedia Screen

When an AirMedia® presentation gateway source is selected and the wireless connection has not already been established, the following screen is displayed.

Connect to AirMedia Screen

6HQ-2511 11:09 AM July 27, 2017 < Back Connect to AirMedia® To present content over your WiFi wireless network, please: CONNECT + <<+) + ●●●● to your wireless network VISIT + this browser address: 172.30.16.83 + ENTER this code: 1816 Download the Crestron AirMedia® app for your mobile device at: present.crestron.com

The Connect to AirMedia screen provides instructions for connecting to the AirMedia device over a wireless network. Once this connection has been established, AirMedia can be selected as a presentation source.

If the connection code has been disabled, a version of the Connect to AirMedia screen is displayed that omits this step. For more information on disabling the connection code, refer to the AirMedia device's documentation at www.crestron.com/manuals.

Connect to AirMedia Screen - Connection Code Disabled

AVF 67606 2:06 PM December 6, 2017 < Back Connect to AirMedia® To present content over your WiFi wireless network, please: CONNECT to your wireless network + VISIT this browser address: 172.30.16.70 Download the Crestron AirMedia® app for your mobile device at: present.crestron.com

Press BACK to return to the Present a Source screen.

Now Presenting Screen - AirMedia Source

When an AirMedia source is selected (once a wireless connection has been established), the following screen is displayed.

Present Screen - AirMedia Source

6HQ-2511 11:13 AM July 27, 2017 < Back Now Presenting Stop Wirelessly playing source via AirMedia®

The Now Presenting screen for AirMedia shows that the source is connected wirelessly over AirMedia. The circle icon in the center of the screen turns green if the source is connected and turns red if the source is disconnected.

Press Stop on the top right of the screen to disconnect from the AirMedia source.

Press BACK to return to the Present a Source screen. (Pressing BACK does not disconnect the source.)

Now Presenting Screen - Other Source Devices

The touch screen project provides custom Now Presenting screens for various source devices, such as cable TV receivers and video servers, which include controls that are specific to the device and that are mapped via the device driver.

To view more examples of Now Presenting screens for other source devices, refer to the .AV Framework DMPS UI Guide at www.crestron.com/manuals.

Appendix A: Interface Setup

This appendix provides information on how to connect various supported interfaces to the Crestron Virtual Control server.

Connection Overview

To connect Ethernet devices, use one of the following methods:

NOTE: A device must only be assigned to one room unless it is a shared device or a touch screen device.

- Use the Connect Request method in Crestron Toolbox™ software to specify the Room ID of the room that is running the .AV Framework program. For more information, refer to the embedded Crestron Virtual Control help file.

NOTE: The latest version of Crestron Toolbox and the latest device firmware are required to use the Connect Request method.

- Set the IP table of the Ethernet device to point to the IP address or hostname of the Crestron Virtual Control server via the device setup pages (if available) or via the IP table dialog box in Crestron Toolbox software.

Devices can also be associated with rooms manually. For more information, refer to the embedded Crestron Virtual Control help file by clicking the help button ? on the top right of the configuration utility.

If a device with older firmware is not on the same subnet as the Crestron Virtual Control server, it cannot be discovered by the server. As a workaround, the admin can create a "device_resolution.cfg" file that contains the FQDN (fully qualified domain name), MAC address, and device type for any cross-subnet devices with older firmware. The Crestron Virtual Control service reads this file on startup and then once every hour while the service is running.

For more information, refer to "Appendix E: Connect Devices with Older Firmware across Subnets" in the Crestron Virtual Control Installation Guide (Doc. 8274).

NOTE: Some older devices, such as the MP-B10/MP-B20 button panels and Crestron Connected devices, may require DNS names to be created manually for them to work with the device resolution configuration.

TSW Series Touch Screens

Connect a supported Crestron TSW series touch screen (TSW-752, TSW-1052, TSW-760, or TSW-1060) to the .AV Framework room to control room scheduling and source selection functions from the touch screen.

NOTE: The .AV Framework touch screen project must be loaded on the touch screen prior to operation.

To connect a TSW series touch screen:

NOTE: Ethernet setup screens for the TSW-760 and TSW-1060 are shown for this procedure. Similar screens are used to connect the TSW-752 and TSW-1052.

  1. On the Setup screen, tap IP Table Setup to display the Ethernet Setup - IP Table screen.

Ethernet Setup - IP Table Screen

< BACK Ethernet Setup - IP Table Touch a Setting to Edit Add/Edit - Add Entry - Add/Edit - Add Entry - Add/Edit - Add Entry - Add/Edit - Add Entry - Online Save & Exit

  1. Tap Add/Edit next to an empty IP table entry. The Ethernet Setup - Edit IP Table Entry screen is displayed.

Ethernet Setup - IP Table Screen
Ethernet Setup - Edit IP Table < BACK Touch a Setting to Edit CIP ID IP Address / Hostname Port 3 41794 SAVE DELETE Save & Exit

  1. Tap the text field below CIP ID to display the Edit CIP ID on-screen hex keypad.

Edit CIP ID - On-Screen Hex Keypad
Edit CIP ID < CANCEL 3 1 2 3 4 5 6 7 8 9 A B C D E F 0 SAVE

  1. Use the keypad to enter the IP ID for connecting to the Crestron Virtual Control server.

  2. Tap the clear button ✗ in the text field to clear any previous entry.

  3. Tap the delete button ✉ to delete the last digit.
  4. Tap SAVE to save a new entry or tap < CANCEL to discard any changes.

  5. Tap the text field below IP Address / Hostname to display the Edit IP/Host on-screen keyboard.

Edit IP/Host - On-Screen Keyboard
Edit IP/Host < CANCEL q w e r t y u i o p a s d f g h j k l Caps Lock z x c v b n m + Shift Space .?123 SAVE

  1. Use the keyboard to enter the IP address or hostname of the Crestron Virtual Control server.

  2. Tap the clear button (✗) in the text field to clear any previous entry.

  3. Tap the delete button (✗) to delete the last digit.
  4. Tap SAVE to save a new entry or tap < CANCEL to discard any changes. The display returns to the Ethernet Setup - IP Table screen.

  5. On the Ethernet Setup - IP Table screen, tap SAVE to save the current entry.

NOTE: A touch screen that is associated with a room manually is not able to load touch screen projects from the Crestron Virtual Control server. Use the Connect Request method in Crestron Toolbox to ensure that the touch screen project is loaded when the touch screen comes online.

XPanel

Connect to XPanel to configure a virtual touch screen project for testing and control.

To configure a virtual touch screen project with XPanel:

  1. Install XPanel by running Crestron XPanel installer.air (for Macintosh® systems) or Crestron XPanel installer.exe (for Windows® systems). These installer applications can be downloaded from www.crestron.com/software.
  2. Load the touch screen project .vtz file in the XPanel application.
  3. Open the configuration dialog box by selecting Options > Host Settings.
  4. Enter the IP address of the Crestron Virtual Control server running the .AV Framework program.
  5. Enter the IP ID for connecting to the Crestron Virtual Control server.
  6. Click Connect.

Configuration Dialog Box
Hostname/IP Address: 172.30.16.63 IPID: 03 Port: 41794 Use SSL: Connect Cancel

The touch screen project can also be displayed and tested using the .AV Framework program's built-in web XPanel interface.

NOTE: A touch screen device must be added to the .AV Framework room with IP ID 04 to access the web XPanel interface. The "Webx" touch screen device with IP ID 04 is added to new .AV Framework rooms by default.

To access the web XPanel interface from the Crestron Virtual Control web interface:

  1. Click the Status tab.
  2. Click Rooms to expand the Rooms section.

Status Tab - Rooms

CRESTRON VIRTUAL CONTROL Server: ubuntu Actions Status Settings Rooms Global Filter Add Room Room Room ID Status Program Actions AVFRoom01 AVFROOM01 Running AVFramework01 Devices Device Info Network © 2018 Crestron Electronics, Inc. Privacy Statement | Crestron Unified Communication Software License Agreement

  1. Click the information button i under the Actions column for the room that is running the .AV Framework program. The Status > Details page for the room is displayed.

Status Tab - Details

Status Settings Details Program Status Running Program AVFramework2 Street Address Rockleigh, New Jersey Time Zone America/New_York Room ID AVFROOM01 Configuration URL /VirtualControl/Rooms/AVFROOM01/Html XPanel URL /VirtualControl/Rooms/AVFROOM01/XPanel/Core3XPanel.html Notes Devices

  1. Click the link next to XPanel URL. The web XPanel interface is displayed.

Web XPanel Interface

6HQ-2511 5:06 PM March 13, 2018 5:06 March 13, 2018 START > Help CRESTRON

All touch screen project functions and screens can be tested through the web XPanel interface. Additionally, the virtual touch screen hard buttons (except for the center lightbulb button) provide the same functionality as a physical touch screen.

AM-100/AM-101

Connect a Crestron AM-100 or AM-101 AirMedia presentation gateway to the .AV Framework room to present content wirelessly on a display output.

To connect an AM-100 or AM-101:

  1. Use a web browser to connect to the AirMedia device's IP address.
  2. Click Device Administration to display the login page.
  3. Log in to the configuration utility. The default password is "admin."
  4. Select Crestron Services Setup from the column on the left side of the page.

Device Administration - Crestron Services Setup
CRESTRON Device Administration > Crestron Services Setup System Status Device Setup Network Setup Crestron Services Setup OSD Setup SNMP Setup Device Services Change Password Firmware Upgrade Remote View Setup Reset to Default Reboot System Crestron Control System IP Address or Host name dmps3-ih1 IP ID 10 Port 41794 Communication Status Offline Fusion Server IP Address or Host name IP ID 02 Port 41794 Communication Status Offline Crestron Connected® Device IP Address or Host name Communication Status Offline Current Source None Source None √ Set Automatic Power On ●Immediately ○After Code Entry Power Off Time Out 0 minutes Set Power Control Power On Power Off Power Status Unknown Lamp Hours 0 hours Device Status No Error Apply Cancel Copyright © 2017. All Rights Reserved

  1. Enter the IP address of the Crestron Virtual Control server in the Crestron Control System section.

  2. Set an IP ID used to connect to the Crestron Virtual Control server.

  3. Set the Port to 41794.
  4. Click Apply.

MP-B10/MP-B20

Connect a Crestron MP-B10 or MP-B20 media presentation button panel to the .AV Framework room in place of a touch screen for device routing and source control.

NOTE: Observe the following points when connecting an MP-B10 or MP-B20:

  • No more than two button panels can be added to the same configuration.
  • If .AV Framework is powered off from the button panel, power on functionality is disabled until after a 30-second period has elapsed.
  • If .AV Framework is controlled using a button panel and a connected display device requires a warm-up or cool-down period, button panel functions are disabled until the warm-up or cool-down period has completed.

The scroll wheel on the MP-B10 adjusts volume level.

The .AV Framework configuration utility also provides screens that can be used to configure each button individually. When adding or editing a button panel, click Configure Buttons.

Edit Device Dialog Box - Button Panel

Edit Device Device Type Button Panel Model MP-B20 IPID Display Name MP-B20-IH1 IP ID 08 Configure Buttons Save

The Configure Buttons dialog box is displayed.

Configure Buttons Dialog Box - MP-B20
Configure Buttons Power Toggle PC AirMedia Blu-ray Player Laptop 1 Laptop 2 Play Pause Rewind Disabled Video Mute Laptop 1 Laptop 2 VGA 3 VGA 4 AirMedia Blu-ray Player PC HDMI 8 DM 1 DM 2 Done

Each button on the button panel can be configured by clicking its respective button in the Configure Buttons dialog box. A drop-down menu is displayed when a button is clicked.

Select one of the switcher device's input channels from the drop-down menu to map that input to the button or select one of the provided functions to map that function to the button.

NOTE: When using the MP-B20 for source control, the device's 5-way navigation pad is only functional when an appropriate source device input, such as a Blu-ray Disc player or a media server, is selected. Each button on the navigation pad is mapped to the appropriate function on the selected device's menu.

The default input names for the switcher device inputs can be customized in the configuration utility. For more information, refer to "Inputs/Outputs" on page 43.

NOTE: To view illustrations showing button locations on the MP-B10 and MP-B20, refer to the MP-B10/MP-B20 DO Guide (Doc. 7934) at www.crestron.com/manuals.

Click Done to save any changes and to exit the Configure Buttons dialog box.

Crestron Fusion

Connect to Crestron Fusion software to monitor and control basic room data, system power, source selection, and room scheduling.

Connect to Crestron Fusion

To connect with Crestron Fusion, use the following procedure:

  1. Log in to the Crestron Fusion server.
  2. From the Crestron Fusion header tab, click Open.

Crestron Fusion Cloud Header Tab
Open (0) (0)

  1. From the pull-down tab, click Setup.

Pull-Down Tab
RoomView® Monitoring Energy Management Reports & Analytics Configuration Setup Online Help About ?

  1. Click the + symbol next to Root node to expand the tree. Click the Rooms node to select the node.

Root Node
Security Utility Pricing Root Un-associated Objects

  1. Click Add. From the drop-down list, click Add Room.

Add Drop-Down List
Add Symbol Discover Apply Attributes Edit Delete type search text Root Add Node Add Room Name Add Asset Rooms

The Add - Room dialog box opens.

Add - Room Dialog Box

Add - Room Pick a room template: Add room without template Domino Template A EWS Managed Template D EWS Template B OK

  1. From the drop-down list, make a selection and then click OK. The Add Room to 'Rooms' dialog box opens with the Room Details tab selected.

Room Details Tab

Add Room to "Rooms" Room Details Scheduling Details Address Custom Properties Processors Assets People Alias: Backup Room Name Name: Description: Server Group: Default Group Location: Time Zone: UTC 05.00 Eastern Time (US & Canada) sControl URL: http:// WebCam URL: http:// Inherit Geographic Coordinates Please enter latitude: longitude values in degrees/minutes/seconds with plus/minus format (41° 0' 1.3494") without units. Latitude: Save & Close Close * denotes a required field

  1. Enter information into the required fields as indicated by the red asterisks. Enter optional information as desired.

  2. Click the Scheduling Details tab.

Scheduling Details Tab

Room Details Scheduling Details Address Custom Properties Processors Assets People Server Access: RoomView denotes a required field Save & Close Close

In the Server Access field, select the RoomView® scheduling application.

NOTE: The user can change to another scheduling calendar later.

Click the Processors tab, and then click Add.

Processors Tab

The Add Processor to 'Room' dialog box opens.

Add Processor to 'Room' Dialog Box

Enter the processor information into the required fields as indicated by the red asterisks. Enter optional information as desired.

  1. Click the Discover Symbols check box.

NOTE: If the Discover Symbols check box is selected in the Add Processor to 'Room' dialog box and the control program symbol being used is version 7.2 or higher, the Symbol Discover feature automatically imports the symbol information into the Crestron Fusion database.

  1. Click the Use SSL check box if Discover Symbols was selected and if the processor is configured for Secure CTP Toolbox connections only.

NOTE: In the Crestron SystemBuilder™ and D3 Pro® platforms, the Symbol Discover feature is not supported on symbols below version 7.2.

  1. Click Save & Close.

NOTE: Steps 15 through 21 are not necessary if the Discover Symbols check box is selected in the Add Processor to 'Room' dialog box.

  1. Click the + symbol next to the processor name to add, edit, or delete a symbol.

Add, Edit, or Delete Symbol
Add Edit Delete Processor Name * Host Name Location Port Secure Port Discover Symbols Test Processor 67.52.47.165 41794 41796

  1. Click Add. The Add Symbol to 'New Processor' dialog box opens with the Symbol Details tab selected.

Symbol Details Tab
Symbol Details Analog Attributes Digital Attributes Serial Attributes Symbol Name Version: 8 IPID 03 Use SSL: * denotes a required field Save & Close Close

  1. In the Symbol Name field, enter a name. Enter optional information as desired.

  2. Set the Version and the IPID to match the Crestron Fusion symbol in the program.

NOTE: The version 8 symbol is the same as the Crestron Fusion Room symbol in Crestron SIMPL. If using SystemBuilder or D3 Pro, select the version 6 symbol.

  1. Click the Use SSL check box if the processor is configured for Secure CIP connections only.

  2. Click Save & Close to save the symbol; click Save & Close again to save the room.

NOTE: To associate the room with a node other than the selected Rooms node, click and drag the new room to that node. The room is now associated with the new node.

Room Control and Monitoring

Room monitoring and control in Crestron Fusion use the following attributes.

System Monitors (Read Only)

TYPE FUNCTION
SerialCrestron Fusion Error Message
SerialCrestron Fusion Log Text
SerialCrestron Fusion Device Usage

Controller (Read Only)

TYPE FUNCTION
Serial Name
Serial Hostname
Serial IP Address
Serial Subnet Mask
Serial Default Router
Digital Connected

Environment (Read Only)

TYPE FUNCTION
Analog System Volume

Environment (Read/Write)

TYPE FUNCTION
Digital System Power
Digital System Mute

Switch (Read Only)

TYPE FUNCTION
Serial Display Name
Serial Model
Serial Input Channels Enabled
Serial Output Channels Enabled
Serial Input 1 Name
Serial Input 2 Name
Serial Input 3 Name
Serial Input 4 Name
Serial Input 5 Name
Serial Input 6 Name
Serial Input 7 Name
Serial Input 8 Name
Serial Input 9 Name
Serial Input 10 Name
Serial Output 1 Name
Serial Output 2 Name
Serial Output 3 Name
Digital Connected

Monitor the assets connected to the room with the following attributes:

TSW-752/TSW-1052 (Read Only)

TYPE FUNCTION
Digital Connected

TSW-760/TSW-1060 (Read Only)

TYPE FUNCTION
Digital Connected

Flat Panel Display (Read Only)

TYPE FUNCTION
Digital Connected

Blu-ray Disc Player (Read Only)

TYPE FUNCTION
Digital Connected

AM-100/AM-101 (Read Only)

TYPE FUNCTION

Digital Connected

AM-200/AM-300 (Read Only)

TYPE FUNCTION

Digital Connected

MPB-10/MP-B20 (Read Only)

TYPE FUNCTION

Digital Connected

Cable TV Receiver (Read Only)

TYPE FUNCTION

Digital Connected

Projector (Read Only)

TYPE FUNCTION

Digital Connected

Video Server (Read Only)

TYPE FUNCTION

Digital Connected

Appendix B: Device Configuration

Each device that is compatible with .AV Framework for Crestron Virtual Control has specific fields that must be configured when the device is added to the system.

The tables below provide information about the various configuration fields associated with each device class.

AirMedia

Add New Device Fields - AirMedia

FIELD DESCRIPTION SUPPORTED VALUES
Display NameThe user defined AirMedia device display name
ModelThe AirMedia device model nameAM-100, AM-101, AM-200, AM-300
ControlThe transport method used for device controlIP ID
IP IDThe IP ID used to connect the AirMedia device to the server

NOTE: The AM-200 and AM-300 can be added to the system as a source device or as an A/V switcher device. To add the AM-200 or AM-300 as an A/V switcher, refer to "Add an A/V Switcher" on page 14.

Blu-ray™ Player

Add New Device Fields - Blu-ray™ Player

Display NameThe user-defined Blu-ray player display name
ModelThe Blu-ray player device model[Any supported video server]
ControlThe transport method used for device controlIP
IPThe Blu-ray player IP address on the network
PortThe Blu-ray player web port

Button Panel

Add New Device Fields - Button Panel

FIELD DESCRIPTION SUPPORTED VALUES
Display NameThe user-defined button panel display name
ModelThe button panel model nameMP-B10 IPID, MP-B10 Cresnet Bus1 , MP-B20 IPID, MP-B10 Cresnet Bus1
ControlThe transport method used for device controlIP ID, Cresnet Bus
IP ID2 The IP ID used to connect the button panel to the server
Gateway Bus3 The bus that the button panel is connected to on the Cresnet gateway

1 This value is provided only when a Cresnet gateway has been added to the system.
2 This field is provided when MP-B10 IPID or MP-B20 IPID is selected for Model.
3 This field is provided when MP-B10 Cresnet Bus or MP-B20 Cresnet Bus is selected for Model.

NOTE: The Add New Device dialog box also provides a Configure Buttons selection when Button Panel is selected as the device type, which can be used to configure individual buttons on the button panel. For more information, refer to "MP-B10/MP-B20" on page 69.

Cable TV

Add New Device Fields - Cable TV

FIELD DESCRIPTION SUPPORTED VALUES
Display NameThe user-defined cable TV receiver display name
ModelThe cable TV receiver model name[Any supported cable TV receiver]
ControlThe transport method used for device controlIP
IPThe cable TV receiver IP address on the network
PortThe cable TV receiver web port

Cresnet Gateway

Add New Device Fields - Cresnet Gateway

FIELD DESCRIPTION SUPPORTED VALUES
Display NameThe user defined Cresnet gateway name
ModelThe Cresnet gateway model nameDIN-CENCN-2
ControlThe transport method used for device controlIP ID
IP IDThe IP ID of the Cresnet gateway

Crestron IO

Add New Device Fields - Crestron IO

FIELD DESCRIPTION SUPPORTED VALUES
Display NameThe user-defined Crestron IO device name
ModelThe Crestron IO device model nameC2N-IO Bus1 , CEN-IO-COM-102, CEN-IO-IR-104, CEN-IO-RY-104
ControlThe transport method used for device controlIP ID, Cresnet Bus
IP ID2 The IP ID used to connect the Crestron IO device to the server
Gateway Bus3 The bus that the Crestron IO device is connected to on the Cresnet gateway

1 This value is provided only when a Cresnet gateway has been added to the system.
2 This field is provided when CEN-IO-COM-102, CEN-IO-IR-104, or CEN-IO-RY-104 is selected for Model.
3 This field is provided when C2N-IO Bus is selected for Model.

DigitalMedia Transmitter

Add New Device Fields - DigitalMedia Transmitter

FIELD DESCRIPTION SUPPORTED VALUES
Display NameThe user defined DigitalMedia transmitter name
ModelThe DigitalMedia transmitter model nameDM-TX-201-C 1 ,DM-TX-401-C 1 ,DM-TX-4K-202-C 1 ,DM-TX-4K-302-C 1
ControlThe transport method used for device controlIP ID
IP IDThe IP ID of the DigitalMedia transmitter

1 These models are only available if an AM-300 is selected as the A/V switcher for the system.

Flat Panel Display

Add New Device Fields - Flat Panel Display

FIELD DESCRIPTION SUPPORTED VALUES
Display NameThe user-defined display name of the flat panel display
ModelThe flat panel display model name[Any supported flat panel display]
ControlThe transport method used for device controlCEC, IP ID, IP, Serial
Default\ Input1 The default input of the flat panel display in the system[Any available input of the appropriate type in the system]
Communications Port2,5 The device port that controls the flat panel display[Any unused communication port for the selected transport method in the system]
IP\ ID3 The IP ID used to connect the flat panel display to the server
IP4 The IP address of the flat panel display on the network
Port4 The flat panel display web port
Channel4,5 The flat panel display Wi-Fi® network channel
Warm\ Up\ Time6,7 The duration that a "warming up" message is displayed on the .AV Framework user interface after the display is powered on, in seconds[Minimum value is the default defined by the device driver; maximum value is 300 seconds]
Cool Down Time6,7 The duration that a "cooling down" message is displayed on the .AV Framework user interface after the display is powered off, in seconds[Minimum value is the default defined by the device driver; maximum value is 300 seconds]
User\ Name8 The username (required or optional) for initiating device control communications
Password8 The password (required or optional) for initiating device control communications

1 This field is provided when a flat panel display that uses a transport method for device control is selected.
2 This field is provided when a CEC-controlled flat panel display is selected for Model.
3 This field is provided when a Crestron Connected controlled flat panel display is selected for Model.
4 Some or all these fields are provided when an IP-controlled flat panel display is selected for Model and IP is selected for Control.
5 Some or all these fields are provided when a serial-controlled flat panel display is selected for Model and Serial is selected for Control.
6 All controls on the user interface are temporarily locked out until the message times out.
7 These fields are provided only if the display driver supports this functionality.
8 These fields are provided when a device driver for a flat panel display requires a username and password to initiate control communications.

Occupancy Sensor

Add New Device Fields - Occupancy Sensor

FIELD DESCRIPTION SUPPORTED VALUES
Display NameThe user-defined occupancy sensor name
ModelThe occupancy sensor model nameGLS-ODT-C-CN Bus1 , GLS-OIR-C-CN Bus1
ControlThe transport method used for device controlCresnet Bus
Gateway BusThe bus that the occupancy sensor is connected to on the Cresnet gateway
Use Sensor TimeoutSets whether system timeout is determined by the occupancy sensor device (For example, if Yes is selected, the system times out if no occupancy is detected in a room)Yes, No
Timeout Minutes2 The duration in minutes that it takes for the system to time out if sensor timeout is not used
Turn System OnSets whether the .AV Framework system turns on if motion is detected by the occupancy sensor deviceYes, No
Turn System OffSets whether the .AV Framework system turns off if no occupancy is detected by the occupancy sensor deviceYes, No
Route Default VideoSets whether default video is routed when the occupancy sensor turns on the .AV Framework system.Yes, No

1 This value is provided only when a Cresnet gateway has been added to the system.
2 This field is provided when No is selected for Use Sensor Timeout.

Projector

Add New Device Fields - Projector

FIELD DESCRIPTION SUPPORTED VALUES
Display NameThe user-defined projector display name
ModelThe projector model name[Any supported projector]
ControlThe transport method used for device controlIP ID, IP, Serial
Default InputThe default input of the projector in the system[Any available input of the appropriate type in the system]
IP\ ID1 The IP ID used to connect the projector to the server
IP2 The IP address of the projector on the network
Port2 The projector web port
Communications Port3 The device port that controls the projector[Any unused communication port for the selected transport method in the system]
Warm Up Time4.5The duration that a "warming up" message is displayed on the .AV Framework user interface after the projector is powered on, in seconds[Minimum value is the default defined by the device driver; maximum value is 300 seconds]
Cool Down Time4.5 The duration that a "cooling down" message is displayed on the .AV Framework user interface after the projector is powered off, in seconds[Minimum value is the default defined by the device driver; maximum value is 300 seconds]
User\ Name6 The username (required or optional) for initiating device control communications
Password6 The password (required or optional) for initiating device control communications

1 This field is provided when IP ID is selected for Control.
2 These fields are provided when IP is selected for Control.
3 This field is provided when Serial is selected for Control.
4 All controls on the user interface are temporarily locked out until the message times out.
5 These fields are provided only if the projector driver supports this functionality.
6 These fields are provided when a device driver for a projector requires a username and password to initiate control communications.

NOTE: If the selected projector driver supports video mute, a blank projector screen is outputted to the projector when video mute is enabled.

Room Availability Hallway Sign

Add New Device Fields - Touch Screen

FIELD DESCRIPTION SUPPORTED VALUES
Display NameThe user-defined room availability sign display name
ModelThe room availability sign model nameSSW/SCC Bus1
ControlThe transport method used for device controlCresnet Bus
Gateway BusThe bus that the room availability sign is connected to on the Cresnet gateway

1 This value is provided only when a Cresnet gateway has been added to the system.

Touch Screen

Add New Device Fields - Touch Screen

FIELD DESCRIPTION SUPPORTED VALUES
Display NameThe user-defined touch screen display name
ModelThe touch screen model nameTSW-1052, TSW-1060, TSW-752, TSW-760, Webx
ControlThe transport method used for device controlIP ID
IP IDThe IP ID used to connect the touch screen to the server

NOTE: Select Webx using the Model drop-down menu when configuring a virtual touch screen project with the .AV Framework program's built-in XPanel interface. For more information, refer to "Xpanel" on page 65.

Video Server

Add New Device Fields - Cable TV

FIELD DESCRIPTION SUPPORTED VALUES
Display NameThe user-defined video server device display name
ModelThe video server device model[Any supported video server]
ControlThe transport method used for device controlCEC, IP
Communications Port 1 The device port that controls the video server device[Any unused communication port for the selected transport method in the system]
IP 2 The video server device IP address on the network
Port 2 The video server device web port

1 This field is provided when CEC is selected for Control.

2 These fields are provided when IP is selected for Control.

This page is intentionally left blank.

Table of contents Click a title to access it
Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : Crestron

Model : VC-4-ROOM-1-49

Category : Software