CNH-DE-S722 - Shower door Vevor - Free user manual and instructions
Find the device manual for free CNH-DE-S722 Vevor in PDF.
| Product Type | Shower Door for Bathtub |
| Brand | Vevor |
| Model | CNH-DE-S722 |
| Material | Tempered safety glass |
| Usage | For bathtub, wall-mounted installation |
| Power Supply | None (non-electric) |
| Safety | Tempered glass, requires two people for installation |
| Maintenance and Cleaning | Clean with a soft cloth and non-abrasive cleaner |
| Included Parts | Rails, handles, guide block, screws, 3M adhesive tape (depending on option) |
| Accessories Provided | See detailed parts list in the manual |
| Assembly | Requires assembly by at least two people |
| Warranty | Electronic warranty, technical support via www.vevor.com/support |
| Certifications | CE, UK representative (YH CONSULTING LIMITED) |
| Importer (United States) | Sanven Technology Ltd., Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730 |
| CE Representative | E-CrossStu GmbH, Mainzer Landstr.69, 60329 Frankfurt am Main |
| Safety Instructions | Wear ANSI safety glasses and work gloves during assembly |
| Country of Origin | Not specified |
Frequently Asked Questions - CNH-DE-S722 Vevor
User questions about CNH-DE-S722 Vevor
0 question about this device. Answer the ones you know or ask your own.
Ask a new question about this device
Download the instructions for your Shower door in PDF format for free! Find your manual CNH-DE-S722 - Vevor and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. CNH-DE-S722 by Vevor.
USER MANUAL CNH-DE-S722 Vevor
Technical Support and E-Warranty Certificate www.vevor.com/support
Bathtub shower door CNH-DE-S722
We continue to be committed to provide you tools with competitive price. "Save Half", "Half Price" or any other similar expressions used by us only represents an estimate of savings you might benefit from buying certain tools with us compared to the major top brands and does not necessarily mean to cover all categories of tools offered by us. You are kindly reminded to verify carefully when you are placing an order with us if you are actually saving half in comparison with the top major brands.
Model:CNH-DE-S722

natural_image
Line drawing of a double door with two horizontal bars and a side latch (no text or symbols)NEED HELP? CONTACT US!
Have product questions? Need technical support? Please feel free to contact us:
Technical Support and E-Warranty Certificate www.vevor.com/support
This is the original instruction, please read all manual instructions carefully before operating. VEVOR reserves a clear interpretation of our user manual. The appearance of the product shall be subject to the product you received. Please forgive us that we won't inform you again if there are any technology or software updates on our product.
INSTRUCTIONS
Thank you very much for choosing this Bathtub shower door.
- Please read all of the instructions before using it. The information will help you achieve the best possible results.
The products carried in this catalog may be different in color than the actual item.
SAFETY INSTRUCTION AND PRECAUTIONS

Please read this user manual carefully!
Assembly Precautions
- Carefully check the box for any damages. If damaged, please take a photo for your record and contact our service team for help.
- It is dangerous if not installed correctly. Fasten all screws, nuts before using it.
- Please assemble according to these instructions. Improper assembly can create hazards.
- Wear ANSI-approved safety goggles and heavy-duty work gloves during assembly.
- Keep the assembly area clean and well-lit.
- Please do not discard the box until after you have finished assembling the shower door.
- Do not assemble when tired or when under the influence of alcohol, drugs or medication.
8.Do not alter this product in any manner. - The box contains some small components; please place them properly before installation to keep them away from kids and ensure safety.
Installation instructions
Please read and follow the installation instructions and guidelines in this section. Failure to follow the recommended instructions and installation techniques may lead to possible damage to the unit or the surrounding area. This can affect warranty claims.
ATTENTION: This unit requires assembly. A minimum of two people are required for assembly, as several of the sections can be large and unstable until assembled.

1 X6 | 2 X2 | 3 X6 | 4 X8 | 5 X2 |
6![]() | 7 X1+X1 | 8 X1 | 9 X1 | 10 X2 |
11 X2 | 12 X2 | 13 X3 | 14 X2 | 15 X1 |

CONTINUED

CONTINUED
2


flowchart
graph TD
A["14"] --> B["Process Step"]
B --> C["Step 1"]
C --> D["Step 2"]
D --> E["Step 3"]
E --> F["Step 4"]
F --> G["Step 5"]
G --> H["Step 6"]
H --> I["Step 7"]
I --> J["Step 8"]
J --> K["Step 9"]
K --> L["Step 10"]
L --> M["Step 11"]
M --> N["Step 12"]
N --> O["Step 13"]
O --> P["Step 14"]
P --> Q["Step 15"]
Q --> R["Step 16"]
R --> S["Step 17"]
S --> T["Step 18"]
T --> U["Step 19"]
U --> V["Step 20"]
V --> W["Step 21"]
W --> X["Step 22"]
X --> Y["Step 23"]
Y --> Z["Step 24"]
Z --> AA["Step 25"]
AA --> AB["Step 26"]
AB --> AC["Step 27"]
AC --> AD["Step 28"]
AD --> AE["Step 29"]
AE --> AF["Step 30"]
AF --> AG["Step 31"]
AG --> AH["Step 32"]
AH --> AI["Step 33"]
AI --> AJ["Step 34"]
AJ --> AK["Step 35"]
AK --> AL["Step 36"]
AL --> AM["Step 37"]
AM --> AN["Step 38"]
AN --> AO["Step 39"]
AO --> AP["Step 40"]
AP --> AQ["Step 41"]
AQ --> AR["Step 42"]
AR --> AS["Step 43"]
AS --> AT["Step 44"]
AT --> AU["Step 45"]
AU --> AV["Step 46"]
AV --> AW["Step 47"]
AW --> AX["Step 48"]
AX --> AY["Step 49"]
Inside

Inside

Inside

Inside

Inside


Inside
3


flowchart
graph TD
A["Tool Position"] --> B["Assembly"]
B --> C["Assembly with Internal Control"]
C --> D["Assembly with Internal Control"]
D --> E["Assembly with Internal Control"]
E --> F["Assembly with Internal Control"]
F --> G["Assembly with Internal Control"]
G --> H["Assembly with Internal Control"]
CONTINUED
4A Suggested Option A: Secure guide block with 3M tape.







CONTINUED

Alternative Option B: Drill hole and secure guide block with screw.

CONTINUED

6

Address: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.
Imported to AUS: SIHAO PTY LTD, 1 ROKEVA STREETEASTWOOD NSW 2122 Australia
Imported to USA: Sanven Technology Ltd., Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730
| EC | REP |
E-CrossStu GmbH
Mainzer Landstr.69, 60329 Frankfurt am Main.
| UK | REP |
YH CONSULTING LIMITED.
C/O YH Consulting Limited Office 147, Centurion House, London Road, Staines-upon-Thames, Surrey, TW18 4AX
VEVOR®
TOUGH TOOLS, HALF PRICE
Technical Support and E-Warranty Certificate
www.vevor.com/support
VEVOR®
TOUGH TOOLS, HALF PRICE
natural_image
Line drawing of a double door with two horizontal bars and a curved handle (no text or symbols)BESOIN D'AIDE? CONTACTEZ-NOUS!

SUITE







SUITE

SUITE
6

Adresse : Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.
Importé en Australie : SIHAO PTY LTD, 1 ROKEVA STREET, ASTWOOD NSW2122 Australie
C/O YH Consulting Limited Bureau 147, Centurion House,
Route de Londres, Staines-upon-Thames, Surrey, TW18 4AX
VEVOR®
TOUGH TOOLS, HALF PRICE
www.vevor.com/support
VEVOR®
TOUGH TOOLS, HALF PRICE
natural_image
Line drawing of a double door with two horizontal bars, no text or symbols presentwww.vevor.com/support

flowchart
graph TD
A["Step 14"] --> B["Process Step"]
B --> C["Step 2"]
C --> D["Step 3"]
D --> E["Step 4"]
E --> F["Step 5"]
F --> G["Step 6"]
G --> H["Step 7"]
H --> I["Step 8"]
I --> J["Step 9"]
J --> K["Step 10"]
K --> L["Step 11"]
L --> M["Step 12"]
M --> N["Step 13"]
N --> O["Step 14"]
style A fill:#fff,stroke:#000
style B fill:#fff,stroke:#000
style C fill:#fff,stroke:#000
style D fill:#fff,stroke:#000
style E fill:#fff,stroke:#000
style F fill:#fff,stroke:#000
style G fill:#fff,stroke:#000
style H fill:#fff,stroke:#000
style I fill:#fff,stroke:#000
style J fill:#fff,stroke:#000
style K fill:#fff,stroke:#000
style L fill:#fff,stroke:#000
style M fill:#fff,stroke:#000
style N fill:#fff,stroke:#000
style O fill:#fff,stroke:#000
Inside

Inside




Inside

Innen
FORTSETZUNG
Und


flowchart
graph TD
A["Step A: Hand press or tool"] --> B["Step B: Robot movement and rotation"]
B --> C["Step C: Internal lock mechanism with X indicator"]
C --> D["Step D: Internal lock mechanism with X indicator"]
D --> E["Step E: Robot assembly with directional arrows"]
E --> F["Step F: Robot movement and rotation"]
F --> G["Step G: Internal lock mechanism with X indicator"]
G --> H["Step H: Mechanical assembly with directional arrows"]
FORTSETZUNG







FORTSETZUNG

FORTSETZUNG

FORTSETZUNG
6

Adresse: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, Shanghai 200000 CN.
Nach AUS importiert: SIHAO PTY LTD, 1 ROKEVA STREETEASTWOOD NSW2122 Australien
Importiert in die USA: Sanven Technology Ltd., Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730
| Vertreter der EG |
E-CrossStu GmbH
Mainzer Landstr.69, 60329 Frankfurt am Main.
| UK | REP |
YH CONSULTING LIMITED.
C/O YH Consulting Limited Office 147, Centurion House, London Road, Staines-upon-Thames, Surrey, TW18 4AX
VEVOR®
TOUGH TOOLS, HALF PRICE
www.vevor.com/support
VEVOR®
TOUGH TOOLS, HALF PRICE
natural_image
Isometric line drawing of a double door frame with handle bars (no text or symbols)
CONTINUA







CONTINUA

CONTINUA
6

Indirizzo: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.
Importato in AUS: SIHAO PTY LTD, 1 ROKEVA STREETEASTWOOD NSW2122 Australia
Importato negli USA: Sanven Technology Ltd., Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730
www.vevor.com/support
VEVOR®
TOUGH TOOLS, HALF PRICE
natural_image
Line drawing of a double door with two horizontal bars and a curved handle (no text or symbols)www.vevor.com/support

CONTINUADO







CONTINUADO

CONTINUADO
6

Dirección: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.
Importado a AUS: SIHAO PTY LTD, 1 ROKEVA STREETEASTWOOD NSW2122 Australia
Importado a EE. UU.: Sanven Technology Ltd., Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730
| REPRESENTANTE CE |
E-CrossStu GmbH
www.vevor.com/support
VEVOR®
TOUGH TOOLS, HALF PRICE
natural_image
Line drawing of a double door with two horizontal bars and a curved handle (no text or symbols)POTRZEBUJESZ POMOCY? SKONTAKTUJ SIĘ Z NAMI!
www.vevor.com/support

flowchart
graph TD
A["Step A: Hand press or tool"] --> B["Step B: Robot movement and rotation"]
B --> C["Step C: Internal lock mechanism with X indicator"]
C --> D["Step D: Internal lock mechanism with X indicator"]
D --> E["Step E: Robot assembly with directional arrows"]
E --> F["Step F: Robot movement and rotation"]
F --> G["Step G: Internal lock mechanism with X indicator"]
G --> H["Step H: Mechanical assembly with directional arrows"]
DALSZY







DALSZY

DALSZY
6

Adres: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, szanghaj 200000 CN.
Importowane do AUS: SIHAO PTY LTD, 1 ROKEVA STREETEASTWOOD NSW2122 Australia
Importowane do USA: Sanven Technology Ltd., Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730
| Przedstawiciel UE |
E-CrossStu GmbH
Mainzer Landstr.69, 60329 Frankfurt nad Menem.
| REP WIELKIEJ BRYTANII |
YH CONSULTING LIMITED.
C/O YH Consulting Limited Biuro 147, Centurion House,
London Road, Staines-upon-Thames, Surrey, TW18 4AX
VEVOR®
TOUGH TOOLS, HALF PRICE
www.vevor.com/support
VEVOR®
TOUGH TOOLS, HALF PRICE
Technische ondersteuning en e- garantiecertificaat www.vevor.com/support
Badkuip douchedeur
CNH-DE-S722
natural_image
Line drawing of a double door with two horizontal bars and a curved handle (no text or symbols)HULP NODIG? NEEM CONTACT MET ONS OP!

VOORTGEZET







VOORTGEZET

VOORTGEZET
6

Adres: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.
C/O YH Consulting Limited Kantoor 147, Centurion House, Londen Road, Staines-upon-Thames, Surrey, TW18 4AX
VEVOR®
TOUGH TOOLS, HALF PRICE
www.vevor.com/support
VEVOR®
TOUGH TOOLS, HALF PRICE
natural_image
Line drawing of a double door with two horizontal bars and a curved handle (no text or symbols)BEHÖVER HJÄLP? KONTAKTA OSS!
www.vevor.com/support

FORTSATT







FORTSATT

FORTSATT
6

Adress: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.
Importerad till AUS: SIHAO PTY LTD, 1 ROKEVA STREETEASTWOOD NSW2122 Australien
Importerad till USA: Sanven Technology Ltd., Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730
| EC | REP |
E-CrossStu GmbH
Mainzer Landstr.69, 60329 Frankfurt am Main.
| UK | REP |
YH CONSULTING LIMITED.
C/O YH Consulting Limited Office 147, Centurion House, London Road, Staines-upon-Thames, Surrey, TW18 4AX
VEVOR®
TOUGH TOOLS, HALF PRICE
www.vevor.com/support
X6
X2
X6
X8
X2
X1+X1
X1
X1
X2
X2
X2
X3
X2
X1