JH-101 - Foldable soccer goal Vevor - Free user manual and instructions
Find the device manual for free JH-101 Vevor in PDF.
User questions about JH-101 Vevor
0 question about this device. Answer the ones you know or ask your own.
Ask a new question about this device
Download the instructions for your Foldable soccer goal in PDF format for free! Find your manual JH-101 - Vevor and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. JH-101 by Vevor.
USER MANUAL JH-101 Vevor
Technical Support and E-Warranty Certificate www.vevor.com/support
FOLDING SOCCER GOAL
MODEL: JH-101
We continue to be committed to provide you tools with competitive price. "Save Half", "Half Price" or any other similar expressions used by us only represents an estimate of savings you might benefit from buying certain tools with us compared to the major top brands and does not necessarily mean to cover all categories of tools offered by us. You are kindly reminded to verify carefully when you are placing an order with us if you are actually saving half in comparison with the top major brands.
MODEL: JH-101

natural_image
Line drawing of a soccer field with netting and support structure (no text or symbols)NEED HELP? CONTACT US!
Have product questions? Need technical support? Please feel free to contact us:
Technical Support and E-Warranty Certificate www.vevor.com/support
This is the original instruction, please read all manual instructions carefully before operating. VEVOR reserves a clear interpretation of o user manual. The appearance of the product shall be subject to the product you received. Please forgive us that we won't inform you ag there are any technology or software updates on our product.
Thank you very much for choosing this Folding Soccer Goal. Please read a instructions before using it. The information will help you achieve the best post results.
SAFETY ADVICE
SAFE WORKING PRACTICE
▶ Always inspect the goal post and net for defects before use and replace damaged parts.
▶ Do not use the goal with faulty parts.
▶ The goal must always be secured to the ground. Weights to used on hard surfaces, ground anchors on grass.
▶ Never climb on the net or the goal frame. The goal must need to be used without the net fitted. Please always adhere to the safety instructions.
▶ Remove all weights and anchors before moving or disassembling the goal. Do not use the goal in windy weather
▶ Do not use the goal in sub zero temperatures. We advise ad supervision during assembly and use. Do not drop any heavy objects on the tubes.
▶ When dismantling the goal ensure that all fittings are packed away, and none are left on the playing surface.

WARNING:
Check regularly that pegs are secure. Loose pegs may cause in Care should be taken when using a mallet as misuse may cause injury.
SPECIFICATIONS
| Model JH-101 | |
| Product size (mm) | 3710 x 1830x 1215 mm |
| Color White | |
| Material PVC + polyester | |
| Main Frame 68mm, | 1.8mm PVC Tubing |
| Netting 2mm, 30ply | PE |
PART LIST
Note: Refer to part numbers and be sure all parts are included.

text_image
Technical diagram of a mechanical assembly with numbered components and an inset showing a close-up of a pipe fitting.
text_image
1 Top Straight Pole x 6 2 Top Curve Pole x 2 3 Back Straight Pole x 2 4 Straight Pole x 2 5 Short Straight Pole x 2 6 Side Bottom End Pole x 2 7 Elbow Joint x 6 8 Back Side Straight Joint x 2 9 Front Frame Straight Joint x 6 Net x 1 Plastic Hook x 36 Ground Pegs x 10STEP 1:Push Button Fitting
STEP 2: Red Tal

text_image
Diagram showing a soccer net with red arrows indicating force application, including inset images of a ball and rope handling.STEP 3: Hook
STEP 4: Pegs
STEPS
- Open all packaging and organize all poles into several groups. Each part will have a number sticker matching the parts list opposite.
- Connect the numbered poles together as shown in the diagram. Ensure the push-button on Joint 7 is located and locked into the h in Poles 1, 4 for a firm fixing (Step 1). Repeat Step 1 on the joint Poles 1, 4, 5, 6 for a firm fixing. And then place the support Poles the holes of joint 7.
- Ensure all straight joint fittings are aligned and locked in position.
- Ideally, two people should remove the net from the bag, unravel a open fully before fitting. Put the net over the frame with the red tab in the top left and right-hand corners once assembled.
- The seam of the net should follow the frame supports. Secure the to the frame using the plastic hooks ensuring you space them out over the whole frame (Step 3).
- It is for use on soft ground/grass only once fully assembled.
Locate the ground pegs to fix underground for added strength and stability (Step 4).
CLEANING AND MAINTENANCE
▶Clean the stand with a wet towel, the Net can be removed for washing and allowed to dry naturally.
Manufacturer: Shanghaimuxinmuyeyouxiangongsi
Address: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.
Imported to AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australia
Imported to USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730

E-CrossStu GmbH
Mainzer Landstr.69, 60329 Frankfurt am Main.

YH CONSULTING LIMITED.
C/O YH Consulting Limited Office 147, Centurion House, London Road, Staines-upon-Thames, Surrey, TW18 4AX
VEVOR®
TOUGH TOOLS, HALF PRICE
Technical Support and E-Warranty Certificate
www.vevor.com/support
VEVOR®
TOUGH TOOLS, HALF PRICE
natural_image
Line drawing of a soccer field with netting and support structure (no text or symbols)BESOIN D'AIDE? CONTACTEZ-NOUS!
text_image
Technical diagram of a mechanical assembly with numbered components and an inset showing a close-up of pipe fittings.
text_image
1 Top Straight Pole x 6 2 Top Curve Pole x 2 3 Back Straight Pole x 2 4 Straight Pole x 2
text_image
5 Short Straight Pole x 2 6 Side Bottom End Pole x 2 7 Elbow Joint x 6 8 Back Side Straight Joint x 2
text_image
9 Front Frame Straight Joint x 6 Net x 1 Plastic Hook x 36 Ground Pegs x 10text_image
Diagram showing a soccer net with red arrows indicating force directions, including a close-up of the net and a close-up of the rope.A/S YH Consulting Limited Bureau 147, Centurion House, London
Road, Staines-upon-Thames, Surrey, TW18 4AX
VEVOR®
TOUGH TOOLS, HALF PRICE
KLAPPBARES FUSSBALLTOR
MODELL: JH-101
KLAPPBARES FUSSBALLTOR
MODELL: JH-101

natural_image
Line drawing of a soccer field with netting and support structure (no text or symbols)text_image
Technical diagram of a mechanical assembly with numbered components and an inset showing a close-up of pipe fittings.
text_image
1 Top Straight Pole x 6 2 Top Curve Pole x 2 3 Back Straight Pole x 2 4 Straight Pole x 2
text_image
5 Short Straight Pole x 2 6 Side Bottom End Pole x 2 7 Elbow Joint x 6 8 Back Side Straight Joint x 2 INSTALLATION EINFÜHRUNG
text_image
9 Front Frame Straight Joint x 6 Net x 1 Plastic Hook x 36 Ground Pegs x 10text_image
Diagram showing a lab setup with red arrows indicating force directions, including a paperclip and mechanical components.SCHRITT 3: Haken
SCHRITT 4: Stifte
SCHRITTE
C/O YH Consulting Limited Office 147, Centurion House, London Road, Staines-upon-Thames, Surrey, TW18 4AX
VEVOR®
TOUGH TOOLS, HALF PRICE
natural_image
Line drawing of a soccer field with netting and support structure (no text or symbols)text_image
Technical diagram of a mechanical assembly with numbered components and an inset showing a close-up of pipe fittings.
text_image
1 Top Straight Pole x 6 2 Top Curve Pole x 2 3 Back Straight Pole x 2 4 Straight Pole x 2
text_image
5 Short Straight Pole x 2 6 Side Bottom End Pole x 2 7 Elbow Joint x 6 8 Back Side Straight Joint x 2 INTRODUZIONE ALL'INSTALLAZIONE
text_image
9 Front Frame Straight Joint x 6 Net x 1 Plastic Hook x 36 Ground Pegs x 10text_image
Diagram showing a soccer net with red arrows indicating force directions, and four circular insets illustrating different positions of the net.FASE 3: Aggancio
PASSO 4: Pioli
PASSAGGI
Importato in AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australia
Importato negli USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730

E-CrossStu GmbH
Mainzer Landstr.69, 60329 Francoforte sul Meno.

CONSULENZA YH LIMITATA.
C/O YH Consulting Limited Ufficio 147, Centurion House, London Road, Staines-upon-Thames, Surrey, TW18 4AX
VEVOR®
TOUGH TOOLS, HALF PRICE
natural_image
Line drawing of a soccer field with netting and support structure (no text or symbols)text_image
Technical diagram of a mechanical assembly with numbered components and an inset showing a close-up of pipe fittings.
text_image
1 Top Straight Pole x 6 2 Top Curve Pole x 2 3 Back Straight Pole x 2 4 Straight Pole x 2
text_image
9 Front Frame Straight Joint x 6 Net x 1 Plastic Hook x 36 Ground Pegs x 10text_image
Diagram showing a lab setup with red arrows indicating force directions, including a paperclip and mechanical components.PASO 3: Enganche
PASO 4: Clavijas
PASOS
C/O YH Consulting Limited Oficina 147, Centurion House,
London Road, Staines-upon-Thames, Surrey, TW18 4AX
VEVOR®
TOUGH TOOLS, HALF PRICE
natural_image
Line drawing of a soccer field with netting and support structure (no text or symbols)POTRZEBUJESZ POMOCY? SKONTAKTUJ SIĘ Z NAMI!
text_image
Technical diagram of a mechanical assembly with numbered components and an inset showing a close-up of pipe fittings.
text_image
1 Top Straight Pole x 6 2 Top Curve Pole x 2 3 Back Straight Pole x 2 4 Straight Pole x 2
text_image
5 Short Straight Pole x 2 6 Side Bottom WPROWADZENIE DO INSTALACJI 7 Elbow Joint x 6 8 Back Side Straight Joint x 2
text_image
9 Front Frame Straight Joint x 6 Net x 1 Plastic Hook x 36 Ground Pegs x 10text_image
Diagram showing a medical or laboratory setup with red arrows indicating force directions, including a magnified view of the chamber and three inset circular insets labeled with Chinese text.KROK 3: Hak
KROK 4: Kołki
KROKI
C/O YH Consulting Limited Biuro 147, Centurion House,
London Road, Staines-upon-Thames, Surrey, TW18 4AX
VEVOR®
TOUGH TOOLS, HALF PRICE
natural_image
Line drawing of a soccer field with netting and support structure (no text or symbols)HULP NODIG? NEEM CONTACT MET ONS OP!
text_image
Technical diagram of a mechanical assembly with numbered components and an inset showing a close-up of pipe fittings.
text_image
1 Top Straight Pole x 6 2 Top Curve Pole x 2 3 Back Straight Pole x 2 4 Straight Pole x 2
text_image
5 Short Straight Pole x 2 6 Side Bottom End Pole x 2 7 Elbow Joint x 6 8 Back Side Straight Joint x 2
text_image
9 Front Frame Straight Joint x 6 Net x 1 Plastic Hook x 36 Ground Pegs x 10STAP 1: Drukknopmontage
STAP 2: Rode tabbladen

text_image
Diagram showing a medical or laboratory setup with red arrows indicating force directions, including a magnified view of the chamber and three inset circular insets illustrating different components.STAP 3: Haak
STAP 4: Pinnen
STAPPEN
C/O YH Consulting Limited Kantoor 147, Centurion House, London Road, Staines-upon-Thames, Surrey, TW18 4AX
VEVOR®
TOUGH TOOLS, HALF PRICE
Technische ondersteuning en e- garantiecertificaat www.vevor.com/support
VEVOR®
TOUGH TOOLS, HALF PRICE
natural_image
Line drawing of a soccer field with netting and support structure (no text or symbols)BEHÖVER HJÄLP? KONTAKTA OSS!
text_image
Technical diagram of a mechanical assembly with numbered components and an inset showing a close-up of pipe fittings.
text_image
1 Top Straight Pole x 6 2 Top Curve Pole x 2 3 Back Straight Pole x 2 4 Straight Pole x 2
text_image
5 Short Straight Pole x 2 6 Side Bottom End Pole x 2 7 Elbow Joint x 6 8 Back Side Straight Joint x 2 INSTALLATION INTRODUCTION
text_image
9 Front Frame Straight Joint x 6 Net x 1 Plastic Hook x 36 Ground Pegs x 10STEG 1: Tryckknappsanpassning
STEG 2: Röda flikar

text_image
Diagram showing a lab setup with red arrows indicating force directions, including a paperclip and mechanical components.STEG 3: Kroka
STEG 4: Pinnar
STEG
C/O YH Consulting Limited Office 147, Centurion House, London Road, Staines-upon-Thames, Surrey, TW18 4AX
VEVOR®
TOUGH TOOLS, HALF PRICE
www.vevor.com/support