GE

ZV800BJBB - Range hood GE - Free user manual and instructions

Find the device manual for free ZV800BJBB GE in PDF.

📄 24 pages English EN Download 💬 AI Question
Notice GE ZV800BJBB - page 4
Pick your language and provide your email: we'll send you a specifically translated version.

User questions about ZV800BJBB GE

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Range hood in PDF format for free! Find your manual ZV800BJBB - GE and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. ZV800BJBB by GE.

USER MANUAL ZV800BJBB GE

Installation Instructions

If you have questions, call 800.626.2000 or visit our website at: www.monogram.com

36" Chimney Vent Hood

ZV800

BEFORE YOU BEGIN

Read these instructions completely and carefully.

  • IMPORTANT — Save these instructions for local inspector's use.
  • IMPORTANT — Observe all governing codes and ordinances.
  • Note to Installer — Be sure to leave these instructions with the Consumer.
  • Note to Consumer — Keep these instructions with your Owner's Manual for future reference.
  • Skill Level — Installation of this appliance requires basic mechanical and electrical skills.
    • Completion Time — 1 to 3 Hours.
  • Proper installation is the responsibility of the installer. Product failure due to improper installation is not covered under the warranty.

For Monogram local service in your area, 1.800.444.1845.

For Monogram service in Canada 1.888.880.3030

For Monogram Parts and Accessories, call 1.800.626.2002.

CAUTION:

Due to the weight and size of these vent hoods and to reduce the risk of personal injury or damage to the product, TWO PEOPLE ARE REQUIRED FOR PROPER INSTALLATION.

PRUDENCE :

To reduce the risk of fire or electrical shock, do not use this range hood with any external solid-state speed control device. Any such alteration from original factory wiring could result in damage to the unit and/or create an electrical safety hazard.

ADVERTISSEMENT :

A. Use this unit only in the manner intended by the manufacturer. If you have any questions, contact the manufacturer.
B. Before servicing or cleaning unit, switch power off at the service panel and lock service panel to prevent power from being switched on accidentally. If the service panel cannot be locked, fasten a tag or prominent warning label to the panel.

ADVERTISSEMENT :

POUR RÉDUIRE LE RISQUE D'INCENDIE, DE CHOC ÉLECTRIQUE OU DE BLESSURES, IL FAUT OBSERVER LES REGLES SUIVANTES:

  • For general ventilating use only. Do not use to exhaust hazardous or explosive materials or vapors.
  • Structural framing, installation work and electrical wiring must be done by qualified person(s). In accordance with all applicable codes and standards including fire-rated construction.
  • Sufficient air is needed for proper combustion and exhausting of gases through the flue (chimney) of fuel burning equipment to prevent back drafting. Follow the heating equipment manufacturer's guideline and safety standards such as those published by the National Fire Protection Association (NFPA), and the American Society for Heating, Refrigeration and Air Conditioning Engineers (ASHRAE), and the local code authorities.
  • Local codes vary. Installation electrical connections and grounding must comply with applicable codes. In the absence of local codes, the vent should be installed in accordance with National Electrical Code ANSI/NFPA 70-1990 or latest edition.

CAUTION: To reduce risk of fire and to properly exhaust air, be sure to duct air outside – do not vent exhaust air into spaces within walls or ceilings or into attics, crawl spaces, or garages.

Product Dimensions and Clearances ....3

Installation Options 3

Advance Planning, Ductwork, Framing 4

Power Supply 4

Duct Fittings....5

Installation Preparation

Tools and Materials Required 6

Remove the Packaging 6

Wall Mount Installations 7

Installation Below a Wall Cabinet 7

Check Installation Hardware 8

Ductwork, Wiring Locations....9

Wall-Mounted Installation – Vented to the Outside

Step 1, Install Framing for Hood Support....9

Step 2, Install Mounting Bracket....10

Step 3, Install Duct Bracket ....10

Step 4, Prepare the Hood ....11

Step 5, Mount the Hood ....11

Step 6, Connect Ductwork ....12

Step 7, Connect Electrical....12

Step 8, Install Duct Covers ....13

Step 9, Install Filters....13

Step 10, Finalize Installation....13

Wall-Mounted Installation – Recirculating

Ductwork, Wiring Locations....14

Step 1, Install Framing for Hood Support....14

Step 2, Install Mounting Bracket....15

Step 3, Prepare the Hood ....15

Step 4, Mount the Hood ....16

Step 5, Size and Cut Duct Piece ....16

Step 6, Connect Electrical....17

Step 7, Install Duct Covers ....17

Step 8, Install Filters....18

Step 9, Finalize Installation....18

Under-Cabinet Installation

Cabinet Requirements 19

Ductwork, Wiring 19

Step 1, Install Framing for Hood Support....20

Step 2, Prepare the Hood ....20

Step 3, Cut the Opening....21

Step 4, Install Side "L" Brackets....21

Step 5, Remove Side Screw 21

Step 6. Mount the Hood ....22

Step 7, Complete Installation and Connect Ductwork....22

Step 8, Connect Electrical....23

Step 9, Install Rear Mounting Screws ......23

Step 10, Install Filters....23

PRODUCT DIMENSION AND CLEARANCE
GE ZV800BJBB - Under-Cabinet Installation - 1

text_image NOTE: The vent hood canopy extends forward 5-7/8". * Height to Ceiling 1-1/2" 12-15/16" at Sides, 13-11/16" at Center 35-7/8" * The Supplied Duct Cover Fits 8 ft. to 10 ft. Ceiling Heights

The vent hood must be installed 24" min., and 30" max. above the cooking surface. The telescopic duct cover conceals the ductwork running from the top of the hood to the ceiling. The duct cover is sized to reach 8 ft. to 10 ft. ceiling heights. The hood installation height, from the cooking surface to the bottom of the hood, depends upon ceiling height.

INSTALLATION OPTIONS
GE ZV800BJBB - Under-Cabinet Installation - 2

text_image 24" Min. 30" Max.

WALL-MOUNTED INSTALLATIONS

This hood may be installed onto a wall and vented to the outdoors, or it can be installed for recirculating operation. All necessary parts for a recirculating operation are shipped with the hood. No kits required.

GE ZV800BJBB - WALL-MOUNTED INSTALLATIONS - 1

text_image *24" Min. *Depending on Cabinet Height

UNDER-CABINET INSTALLATIONS

The hood may be installed beneath a cabinet. The cabinet must measure at least 20" from the bottom frame to the inside top. See page 19.

- Both vented and recirculating operation can be accomplished in an under-cabinet installation. (Custom cabinet modification is required for recirculating operation.)

ADVANCE PLANNING

  • Determine the exact location of the vent hood.
  • Plan the route for venting exhaust to the outdoors.
  • Use the shortest and straightest duct route possible. For satisfactory performance, duct run should not exceed 100 ft. equivalent length for any duct configurations.
  • Refer to "Duct Fittings" chart to compute the maximum permissible length for duct runs to the outdoors.

CAUTION: To reduce risk of fire and to properly exhaust air, be sure to duct air outside – do not vent exhaust air into spaces within walls or ceilings or into attics, crawl spaces, or garages.

  • Use metal ductwork only. These hoods must use 6" round duct. It can transition to 3-1/4" x 12", reducing the maximum equivalent duct length to 75 feet.
  • Install a wall cap with damper or roof cap at the exterior opening. Order the wall or roof cap and any transition needed in advance.

Wall Framing for Adequate Support

  • This vent hood is heavy. Adequate structural support must be provided in all types of installations. The hood must be secured to vertical studs in the wall, or to a horizontal support. For wall mounting installations, see pages 9 and 14. For under-cabinet installations, see page 20.
  • The vent hood and wall cabinet, if used, should be on site before final framing and wall finishing. This will also help to accurately locate the duct work and electrical service.

POWER SUPPLY

IMPORTANT – (Please read carefully)

WARNING:

FOR PERSONAL SAFETY, THIS APPLIANCE MUST BE PROPERLY GROUNDED.

ADVERTISSEMENT :

POUR DES RAISONS DE SÉCURITÉ, CET APPAREIL DOIT ÊTRE CORRECTEMENT MIS À LA TERRE.

Remove house fuse or open circuit breaker before beginning installation.

Do not use an extension cord or adapter plug with this appliance. Follow National electrical codes or prevailing local codes and ordinances.

Electrical supply

These vent hoods must be supplied with 120V, 60Hz, and connected to an individual, properly grounded branch circuit, and protected by a 15 or 20 amp circuit breaker or time delay fuse.

  • Wiring must be 2 wire with ground.
  • If the electrical supply does not meet the above requirements, call a licensed electrician before proceeding.

  • Route house wiring through conduit as close to the installation location as possible, in the ceiling or back wall.

  • Use a conduit connector to secure the conduit to the junction box.
  • Connect the wiring to the house wiring in accordance with local codes.

Grounding instructions

The grounding conductor must be connected to a ground metal, permanent wiring system, or an equipment-grounding terminal or lead on the hood.

WARNING: The improper connection of the equipment-grounding conductor can result in a risk of electric shock. Check with a qualified electrician or service representative if you are in doubt whether the appliance is properly grounded.

ADVERTISSEMENT :

DUCT FITTINGSUse this chart to compute maximum permissible lengths for duct runs to outdoors.Duct Piece Dimensions Length* Used LengthTotal Equivalent Quantity Equivalent
GE ZV800BJBB - ADVERTISSEMENT : - 1Round, 1 ft.straight (per footlength)
NOTE: Do not exceed maximum permissible equivalent lengths!GE ZV800BJBB - ADVERTISSEMENT : - 23-1/4" x 12" 1 ft.3-1/4" x 24" (per foot straight length)
Maximum duct length:100 foot for 6" round duct75 foot for 3-1/4" x 12" ductGE ZV800BJBB - ADVERTISSEMENT : - 36" Round90° elbow 15 ft.
Flexible ducting:If flexible metal ducting is used, all the equivalent feet values in the table should be doubled.The flexible metal duct should be straight and smooth and extended as much as possible.DO NOT use flexible plastic ducting.GE ZV800BJBB - ADVERTISSEMENT : - 46" Round45° elbow 8 ft.
GE ZV800BJBB - ADVERTISSEMENT : - 53-1/4" x 12"90° elbow 11 ft.
GE ZV800BJBB - ADVERTISSEMENT : - 63-1/4" x 12" or45° elbow 6 ft.
GE ZV800BJBB - ADVERTISSEMENT : - 73-1/4" x 12"90° flat elbow 24 ft.
NOTE: Any home ventilation system, such as a ventilation hood, may interrupt the proper flow of combustion air and exhaust required by fireplaces, gas furnaces, gas water heaters and other naturally vented systems. To minimize the chance of interruption of such naturally vented systems, follow the heating equipment manufacturer's guidelines and safety standards such as those published by NFPA and ASHRAE.GE ZV800BJBB - ADVERTISSEMENT : - 86" round to3-1/4" x 12"or 3-1/4" x 24" transition 1 ft.
GE ZV800BJBB - ADVERTISSEMENT : - 93-1/4" x 12" to 6"round transition 8 ft.
GE ZV800BJBB - ADVERTISSEMENT : - 106" roundto 3-1/4" x 12" ortransition 90° elbow 16 ft.
GE ZV800BJBB - ADVERTISSEMENT : - 113-1/4" x 12" to 6" roundround transition 90° elbow17 ft.
GE ZV800BJBB - ADVERTISSEMENT : - 12-6" roundwall capwith damper30 ft.
GE ZV800BJBB - ADVERTISSEMENT : - 13-3-1/4" x 12" wall capwith damper30 ft.
GE ZV800BJBB - ADVERTISSEMENT : - 14-6" Roundroof cap26 ft.
GE ZV800BJBB - ADVERTISSEMENT : - 156" Roundroof vent26 ft.
*Actual length of straight duct plus duct fitting equivalent. Equivalent length of duct pieces are based on actual tests conducted by GE Evaluation Engineering and reflect requirements for good venting performance with any ventilation hood.Total Duct Run ____

TOOLS AND MATERIALS REQUIRED

(NOT SUPPLIED)

□ Tape measure
□ Knife
□ Spirit level
□ Wire cutter/stripper
□ Wire nuts
☐ Electric drill with 1/8" and 3/8" bits
☐ Phillips and flat blade screwdrivers
□ Hammer
□ Pliers
□ Safety glasses
□ Duct tape
☐ Tape to mount template
☐ Gloves to protect against sharp edges
☐ 120V 60Hz. 15 or 20 Amp, 2 wire with ground Properly grounded branch circuit
□ Strain relief for junction cover
☐ 6" round metal duct, length to suit installation
□ Saw or jig saw
□ Conduit for house wiring and conduit connector

GE ZV800BJBB - (NOT SUPPLIED) - 1
Measuring Tape

GE ZV800BJBB - (NOT SUPPLIED) - 2
Spirit level

GE ZV800BJBB - (NOT SUPPLIED) - 3
Gloves

GE ZV800BJBB - (NOT SUPPLIED) - 4
Pliers

GE ZV800BJBB - (NOT SUPPLIED) - 5

text_image Electric drill with 1/8" and 3/8" Drill

Electric drill with 1/8" and 3/8" Bits

GE ZV800BJBB - (NOT SUPPLIED) - 6
Knife

GE ZV800BJBB - (NOT SUPPLIED) - 7
Duct Tape

GE ZV800BJBB - (NOT SUPPLIED) - 8
Safety glasses

GE ZV800BJBB - (NOT SUPPLIED) - 9
Wire cutter/stripper

GE ZV800BJBB - (NOT SUPPLIED) - 10
Strain relief for junction cover

GE ZV800BJBB - (NOT SUPPLIED) - 11
screwdriver

GE ZV800BJBB - (NOT SUPPLIED) - 12
Flat blade screwdriver

GE ZV800BJBB - (NOT SUPPLIED) - 13
Hammer

GE ZV800BJBB - (NOT SUPPLIED) - 14
Wire nuts

GE ZV800BJBB - (NOT SUPPLIED) - 15
Masking tape

GE ZV800BJBB - (NOT SUPPLIED) - 16
Conduit

GE ZV800BJBB - (NOT SUPPLIED) - 17
Saw or jig saw

REMOVE THE PACKAGING

GE ZV800BJBB - REMOVE THE PACKAGING - 1

text_image 2-piece duct cover

- Remove the duct cover, parts box and other packaging.

GE ZV800BJBB - REMOVE THE PACKAGING - 2

natural_image Line drawing of a rectangular box containing three compartments with internal compartments (no text or symbols)
  • Lift the hood out of the box.
  • Remove and properly discard the plastic wrapping.
  • Remove junction box cover.

WALL MOUNT INSTALLATIONS

These hoods may be installed onto a wall or below a wall cabinet.

  • Telescopic duct covers are provided to conceal the ductwork, running to the ceiling.
  • This hood can be installed for recirculating operation. No kits required.

GE ZV800BJBB - WALL MOUNT INSTALLATIONS - 1

text_image 24" Min. 30" Max. 36" Min.

The vent hood must be installed 24" min. and 30" max. above the cooking surface. The hood installation height, from the cooking surface to the bottom of the hood, depends upon ceiling height.

INSTALLATION BELOW A CABINET

GE ZV800BJBB - INSTALLATION BELOW A CABINET - 1

text_image 20" Min. 24" Min.

*The cabinet must measure at least 20" from the bottom frame to the inside top. The hood housing will occupy the interior cabinet space.

Wall Mount ZV800 Installation Heights

Actual *Possible Ceiling *Possible VENTED RECIRCULATING Height Installation Height Installation Height
7'11" 24"to 27" 24" to 25"
8'0" 24"to 28" 24" to 26"
8'1" 24"to 30" 24" to 27"
8'2" 24"to 30" 24" to 28"
8'3" 24"to 30" 24" to 29"
8'4" 24"to 30" 24" to 30"
8'5" 24"to 30" 24" to 30"
8'6" 24"to 30" 24" to 30"
8'7" 24"to 30" 24" to 30"
8'8" 24"to 30" 24" to 30"
8'9" 24"to 30" 24" to 30"
8'10" 24"to 30" 24" to 30"
8'11" 24"to 30" 24" to 30"
9'0" 24"to 30" 24" to 30"
9'1" 24"to 30" 24" to 30"
9'2" 24"to 30" 24" to 30"
9'3" 24"to 30" 24" to 30"
9'4" 24"to 30" 24" to 30"
9'5" 24"to 30" 24" to 30"
9'6" 24"to 30" 24" to 30"
9'7" 25"to 30" 24" to 30"
9'8" 26"to 30" 24" to 30"
9'9" 27"to 30" 24" to 30"
9'10" 28"to 30" 24" to 30"
9'11" 29"to 30" 25" to 30"
10'30" 26"to 30"

*Based on 36" countertop height.

INSTALLATION BELOW A WALL CABINET

Order a cabinet that is at least 20" high from the bottom frame to the inside top. The cabinet must be at least 12" deep.

  • The hood installation height is determined by the ceiling height.
  • The hood installation height must be 24" Min. above the cooking surface.

CHECK INSTALLATION HARDWARE

Locate the hardware accessory box packed with the hood and check contents.

GE ZV800BJBB - CHECK INSTALLATION HARDWARE - 1
4 wood screws

GE ZV800BJBB - CHECK INSTALLATION HARDWARE - 2
4 wall fasteners

GE ZV800BJBB - CHECK INSTALLATION HARDWARE - 3

natural_image Simple line drawing of a 3D mechanical part with a cylindrical base and triangular cutout (no text or symbols)

Air deflector for recirculating installations only

GE ZV800BJBB - CHECK INSTALLATION HARDWARE - 4
Duct bracket

GE ZV800BJBB - CHECK INSTALLATION HARDWARE - 5
Discharge damper

GE ZV800BJBB - CHECK INSTALLATION HARDWARE - 6
Mounting bracket

GE ZV800BJBB - CHECK INSTALLATION HARDWARE - 7

text_image 12" 29-7/8" 27-3/4" 11-1/2"

GE ZV800BJBB - CHECK INSTALLATION HARDWARE - 8
1 charcoal filter for recirculating installations

GE ZV800BJBB - CHECK INSTALLATION HARDWARE - 9

natural_image Two stacked rectangular electronic components with grid patterns, no visible text or symbols

2 stainless steel filters

GE ZV800BJBB - CHECK INSTALLATION HARDWARE - 10
3 Phillips head screws to secure electrical box to top of motor compartment

GE ZV800BJBB - CHECK INSTALLATION HARDWARE - 11
2-piece decorative duct cover (dimension shown for reference only)

GE ZV800BJBB - CHECK INSTALLATION HARDWARE - 12

natural_image Technical line drawing of two metal bracket components with mounting holes (no text or symbols)

GE ZV800BJBB - CHECK INSTALLATION HARDWARE - 13
"L" Brackets with hardware package for cabinet-mounted installations.

Contains 10 Phillips head screws to secure the brackets to the cabinet (8 required, 2 extra)
4 Phillips head decorative screws to secure duct cover to ceiling bracket
GE ZV800BJBB - CHECK INSTALLATION HARDWARE - 14

text_image THE EDGE GRAPENT FEAT WALL MOUNTING BRACKET CUT OUT THE POSITION NOUATING BRACKET THE EDGE GRAPENT FEAT WALL TOP CABINET TEMPLATE Package template with variations and scope to bottom of the cabinet 04/02/122

Cabinet installation template

GE ZV800BJBB - CHECK INSTALLATION HARDWARE - 15

text_image REAR WALL TEMPLATE A 2.5mm bottom section with FLOOD, REAR TIMED TO BOUND OF THE HEAD

Wall mount template

WALL-MOUNTED INSTALLATION—VENTED TO THE OUTSIDE

DUCTWORK, WIRING LOCATIONS

Determine the exact location of the vent hood.

- Locate the template packed with the literature.

  • Measure 36" from the floor to the top of the cooking surface. Add hood installation height determined on page 7. Mark that location.
  • Use a level to draw a straight pencil line on the wall.

GE ZV800BJBB - DUCTWORK, WIRING LOCATIONS - 1

text_image 3-3/4" centerline to wall FOR CEILING VENT DUCTING Ceiling 6-1/2" dia. hole Centerline 3-3/4" min. above top mounting bracket holes FOR WALL VENT DUCT REAR WALL TEMPLATE

– Tape the template in position along the penciled line. CHECK TO BE SURE THE TEMPLATE IS LEVEL.

Ceiling ducting:

If ductwork will vent straight up to the ceiling:

  • Use a level to draw a line straight up, from the centerline on the template to the ceiling.
  • Measure 3-3/4" from the back wall to the centerline of a 6-1/2" hole on the ceiling.

NOTE: If drywall is not present, add drywall thickness to the 3-3/4" dimension.

Wall Ducting:

If ductwork will vent to the rear:

  • Use a level to draw a line straight up from the centerline on the template.
  • Measure at least 3-3/4" above the top mounting bracket holes shown on the template to the centerline of a 6-1/2" dia. duct hole. (Hole may be elongated for duct elbow.)

HOUSE WIRING LOCATION:

  • The junction box is located on the top right side of the hood.
  • Wiring should enter the back wall 20" to 26" above the bottom of the hood, and within 4" of the right side of the centerline. Wiring should enter at least 4" above the bracket on the right side.

1 INSTALL FRAMING FOR HOOD SUPPORT

IMPORTANT — Framing must be capable of supporting 100 lbs.

GE ZV800BJBB - INSTALL FRAMING FOR HOOD SUPPORT - 1

text_image 6" min. opening for ductwork View from rear cleats 1" x 6" min. mounting support Centerline of installation space

If drywall is present, mark the screw hole locations for the top mounting brackets. Remove the template.

  • Cut away enough drywall to expose 2 vertical studs at the bracket location indicated on the template.
  • Install a horizontal support at least 1" x 6" between two wall studs at the top bracket installation location. The horizontal support must be flush with the room side of the studs. Use cleats behind both sides of the support to secure to wall studs.
  • Reinstall drywall.

WALL-MOUNTED INSTALLATION—VENTED TO THE OUTSIDE

2 INSTALL MOUNTING BRACKET

This vent hood must be secured to the horizontal support or wall studs.

  • With the template taped in place, use a punch to mark all mounting screw locations.
  • Drill 1/8" pilot holes at the 6 punched locations.
  • Remove the template.
  • The 2 holes in the support bracket holes must enter studs or the horizontal support.

GE ZV800BJBB - This vent hood must be secured to the horizontal support or wall studs. - 1

natural_image Simple line drawing of a rectangular object with two screws and mounting holes, no text or symbols present.
  • Use wood screws to secure the mounting bracket to the wall. The screws must engage wall studs or the installed horizontal mounting support.
  • Check to be sure that the bracket is level. There is no way to level the hood after hanging it from this bracket.

3 INSTALL DUCT BRACKET

The duct bracket must be intalled against the ceiling. This bracket will hold the duct cover in place at the top.

Secure the bracket to the ceiling and wall:

  • Align the marked centerline on the bracket with the centerline on the wall.
  • Mark the 2 screw hole locations in the ceiling.
  • Drill 1/8" plot holes in the marked locations.
  • If pilot holes do not enter studs, enlarge the holes to 3/8" and install wall fastener anchors.
  • Drive screws, by hand, into the fasteners to allow anchors to expand. Remove the screws.
  • Secure the bracket to the ceiling and wall with wood screws and/or fasteners.

GE ZV800BJBB - Secure the bracket to the ceiling and wall: - 1

natural_image Technical line drawing of a mechanical bracket with screws and a central fastener (no text or symbols)

WALL-MOUNTED INSTALLATION—VENTED TO THE OUTSIDE

4 PREPARE THE HOOD

- Remove the hood from the box. Remove packaging and tape.

GE ZV800BJBB - PREPARE THE HOOD - 1

text_image Electrical panel Remove 2 side cover screws

- Remove one screw on each side of the cover on the electrical panel. Lift off the cover and set aside with screws.

GE ZV800BJBB - PREPARE THE HOOD - 2

text_image Junction box Inside screw Secure electrical panel with 3 screws
  • Stand the electrical panel upright.
  • Align the screw holes in the bottom of the panel with the holes on the base of the hood at the front side.
    • Install 3 screws provided.
  • Snap the damper into the exhaust outlet on the top of the hood.

GE ZV800BJBB - PREPARE THE HOOD - 3

text_image Install damper

5 MOUNT THE HOOD

GE ZV800BJBB - MOUNT THE HOOD - 1

text_image Install a wood screw on each side of the mounting frame Mounting bracket
  • Lift the hood onto the mounting bracket.
  • Check to be sure it is level.
    • Install wood screws through the hood and into the wall on each side of the mounting bracket.

GE ZV800BJBB - MOUNT THE HOOD - 2

text_image Install bottom mounting screws
  • Extend the canopy forward for better access to the rear mounting screw holes.
    • Install 2 wood screws or fasteners through the bottom of the hood into the wall.

WALL-MOUNTED INSTALLATION—VENTED TO THE OUTSIDE

6 CONNECT DUCTWORK

  • Install ductwork, making connections in direction of airflow as illustrated.
  • Push duct over the exhaust outlet and damper.
  • Secure joints in ductwork with sheetmetal screws.
  • Wrap all duct joints with duct tape for an airtight seal.
  • Use duct tape to seal the flange connections.

CAUTION: Do not use sheet metal screws at the hood flange connection. Doing so will prevent proper damper operations. Seal connection with tape only.

GE ZV800BJBB - CONNECT DUCTWORK - 1

text_image Air flow Duct tape over seam and screw Screw

PRUDENCE :

Verify that power is turned off at the source.

WARNING: If house wiring is not 2-wire with a ground wire, a ground must be provided by the installer. When house wiring is aluminum, be sure to use U.L. approved anti-oxidant compound and aluminum-to-copper connectors.

ADVERTISSEMENT :

  • Remove junction box cover and knockout.
  • Use a conduit connector to secure the conduit to the junction box.
  • Connect white leads to branch circuit white lead.
  • Connect black leads to branch circuit black lead.
  • Connect green/yellow leads to branch circuit green lead or bare ground lead.
  • Secure all connections with wire nuts on each electrical connector.
  • Push wires into junction box and replace cover. Be sure wires are not pinched.
  • Secure electrical panel cover with original screws.

WALL-MOUNTED INSTALLATION—VENTED TO THE OUTSIDE

8 INSTALL DUCT COVERS

- Place the decorative duct covers on top of the hood.

NOTE: The inside (upper) duct piece has holes on one end. The holes are intended for use when the hood is installed for recirculating purposes. Slide the vented end into the outer piece, the vent holes should not be visible in this installation.

GE ZV800BJBB - INSTALL DUCT COVERS - 1

text_image Mounting screws

The inside duct piece must slip into the folded ends of the outer section.

GE ZV800BJBB - INSTALL DUCT COVERS - 2

text_image Install 2 screws, duct cover and into ceiling bracket Install 2 bottom duct cover screws
  • Extend the inner duct upwards to the ceiling bracket.
  • Secure duct cover to ceiling bracket with 2 screws.
  • Secure the lower duct cover to the hood by installing 2 screws from the bottom of the hood into the duct cover.

9 INSTALL FILTERS

- Remove protective film on the filters.

GE ZV800BJBB - INSTALL FILTERS - 1

text_image Filter Locks

GE ZV800BJBB - INSTALL FILTERS - 2

natural_image Diagram showing a black downward arrow inside a grid-patterned panel, with no text or symbols present.

NOTE: The charcoal filter is not required for this installation.

  • Tip the filter into the slots at the rear of the opening. Lift the filter lock and pull forward until the filter rests in the slots.
    • Install both metal grease filters.
  • To remove the filters, press inwards on the handle and pull the filter downwards.

10 FINALIZE INSTALLATION

  • Remove all packaging materials.
  • Refer to the Owner's Manual for operating instructions.

WALL-MOUNTED INSTALLATION—RECIRCULATING

DUCTWORK, WIRING LOCATIONS

  • Determine the exact location of the vent hood.
  • Locate the template packed with the literature.
  • Measure 36" from the floor to the top of the cooking surface. Add hood installation height determined on page 7. Mark that location.

GE ZV800BJBB - DUCTWORK, WIRING LOCATIONS - 1

text_image Ceiling 04300000 REAR WALL TEMPLATE ALIGN BOTTOM EDGE WITH PENCE LINE INDICATING BOTTOM OF THE HOOD. 640° 25.4° 12.5° 3.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 3.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5° 2.5°
  • Tape the template in position along the penciled line. CHECK TO BE SURE THE TEMPLATE IS LEVEL.
  • Use a level to draw a line straight up, from the centerline on the template to the ceiling.

HOUSE WIRING LOCATION:

  • The junction box is located on the top right side of the hood.
  • Wiring should enter the back wall 20" to 26" above the bottom of the hood, and within 4" of the right side of the centerline.

1 INSTALL FRAMING FOR HOOD SUPPORT

IMPORTANT: Framing must be capable of supporting 100 lbs.

GE ZV800BJBB - INSTALL FRAMING FOR HOOD SUPPORT - 1

text_image View from rear cleats 1" x 6" min. mounting support Centerline of installation space

If drywall is present, mark the screw hole locations for the top mounting brackets. Remove the template.

  • Cut away enough drywall to expose 2 vertical studs at the bracket location indicated on the template.
  • Install a horizontal support at least 1" x 6" between two wall studs at the top bracket installation location. The horizontal support must be flush with the room side of the studs. Use cleats behind both sides of the support to secure to wall studs.
  • Reinstall drywall.

WALL-MOUNTED INSTALLATION—RECIRCULATING

2 INSTALL MOUNTING BRACKET

This vent hood must be secured to the horizontal support or wall studs.

  • With the template taped in place, use a punch to mark all mounting screw locations.
  • Drill 1/8" pilot holes at the 6 punched locations.
  • Remove the template.
  • The 2 holes in the support bracket holes must enter studs or the horizontal support.

GE ZV800BJBB - This vent hood must be secured to the horizontal support or wall studs. - 1

natural_image Technical line drawing of a mechanical component with two screws and mounting holes (no text or symbols)
  • Use wood screws to secure the mounting bracket to the wall. The screws must engage wall studs or the installed horizontal mounting support.
  • Check to be sure that the bracket is level. There is no way to level the hood after hanging it from this bracket.

3 PREPARE THE HOOD

- Remove the hood from the box. Remove packaging and tape.

GE ZV800BJBB - PREPARE THE HOOD - 1

text_image Electrical panel Remove 2 side cover screws

- Remove one screw on each side of the cover on the electrical panel. Lift off the cover and set aside with screws.

GE ZV800BJBB - PREPARE THE HOOD - 2

text_image Junction box Inside screw Secure electrical panel with 3 screws
  • Stand the electrical panel upright.
  • Align the screw holes in the bottom of the panel with the holes on the base of the hood at the front side.
    • Install 3 screws provided.
  • Snap the damper into the exhaust outlet on the top of the hood.

GE ZV800BJBB - PREPARE THE HOOD - 3

text_image Install damper

WALL-MOUNTED INSTALLATION—RECIRCULATING

4 MOUNT THE HOOD

GE ZV800BJBB - MOUNT THE HOOD - 1

text_image Install a wood screw on each side of the mounting frame Mounting bracket
  • Lift the hood onto the mounting bracket.
  • Check to be sure it is level.
    • Install wood screws through the hood and into the wall on each side of the mounting bracket.

GE ZV800BJBB - MOUNT THE HOOD - 2

text_image Install bottom mounting screws
  • Extend the canopy forward for better access to the rear mounting screw holes.
    • Install 2 wood screws or fasteners through the bottom of the hood into the wall.

5 SIZE AND CUT DUCT PIECE

  • Hold upper air deflector with duct connector against the ceiling.
  • Measure from the bottom of the air deflector to the top of the hood as shown. Reduce that dimension by 1" to facilitate installation.
    The duct will cover and overlap the deflector and the hood outlets.
    Measure length

GE ZV800BJBB - SIZE AND CUT DUCT PIECE - 1

text_image Duct length

5 SIZE AND CUT DUCT PIECE (cont.)

GE ZV800BJBB - SIZE AND CUT DUCT PIECE (cont.) - 1

natural_image Simple line drawing of a 3D box with a curved cutout and a circular base (no text or symbols)
  • Cut the duct piece to size and slip onto the bottom of the duct connector.
  • Use duct tape to seal and secure the duct piece to the connector.

  • Place the assembly over the hood outlet.

  • Hold the assembly against the ceiling. The penciled centerline should show through the slot in the deflector. Mark the screw holes on the sides of the assembly.
  • Remove the assembly and drill 1/8" pilot holes into the wall studs.
  • Enlarge holes that did not enter studs to 3/8" and tap plastic or metal anchors into the holes, flush with the wall.
  • Mount the assembly onto the hood outlet, push up against the ceiling and install the screws provided.

CAUTION: Do not use sheet metal screws at the hood flange connection. Doing so will prevent proper damper operations. Seal connection with tape only.

natural_image Technical line drawing of a hand operating a tool on a cylindrical mechanical component (no text or symbols)

WALL-MOUNTED INSTALLATION—RECIRCULATING

6 CONNECT ELECTRICAL

Verify that power is turned off at the source.

WARNING: If house wiring is not 2-wire with a ground wire, a ground must be provided by the installer. When house wiring is aluminum, be sure to use U.L. approved anti-oxidant compound and aluminum-to-copper connectors.

ADVERTISSEMENT

  • Remove junction box cover and knockout.
  • Use a conduit connector to secure the conduit to the junction box.
  • Connect white leads to branch circuit white lead.
  • Connect black leads to branch circuit black lead.
  • Connect green/yellow leads to branch circuit green lead or bare ground lead.
  • Secure all connections with wire nuts on each electrical connector.
  • Push wires into junction box and replace cover. Be sure wires are not pinched.
  • Secure electrical panel cover with original screws.

7 INSTALL DUCT COVERS

- Place the decorative duct covers on top of the hood. NOTE: The inside piece has holes on one end intended for use when the hood is installed for recirculating purposes. Be sure the vented end is at the top, the vent holes will be visible in this installation.

The inside duct piece must slip into the folded ends on the outer section.

GE ZV800BJBB - INSTALL DUCT COVERS - 1

text_image Mounting screw holes Vent holes

GE ZV800BJBB - INSTALL DUCT COVERS - 2

text_image Install 2 screws, duct cover and into ceiling bracket Install 2 bottom duct cover screws
  • Extend the inner duct piece upwards to the ceiling mounted air deflector.
  • Secure the duct cover to the air deflector, driving one screw on each side.
  • Locate the screw holes on the bottom outside edge of the hood.
  • Secure the lower duct cover to the hood by installing 2 screws from the bottom of the hood into the duct cover.

WALL-MOUNTED INSTALLATION—RECIRCULATING

8 INSTALL FILTERS

Charcoal filter

- Remove protective film on the filters.

GE ZV800BJBB - Charcoal filter - 1

natural_image Technical line drawing of a ceiling-mounted device with mounting holes and a gridded base (no text or symbols)

• Install the black charcoal filter into the center opening.

Metal grease filters

- Tip filters into the slots at the rear of the opening. Lift the filter lock and pull forward until the filter rests in the slots.

GE ZV800BJBB - Metal grease filters - 1

text_image Filter Locks

GE ZV800BJBB - Metal grease filters - 2

natural_image Diagram showing a black downward arrow inside a grid-patterned panel, with no visible text or symbols.

• Install both metal grease filters.
- To remove the filters, press inwards on the handle and pull the filter downwards.

9 FINALIZE INSTALLATION

  • Remove all packaging materials.
  • Refer to the Owner's Manual for operating instructions.

UNDER-CABINET INSTALLATION

CABINET REQUIREMENTS

This hood may be installed beneath a wall-mounted cabinet.

- If the cabinet has been installed, it must be removed so that wall framing supports can be added.

GE ZV800BJBB - CABINET REQUIREMENTS - 1

text_image 20" Min. 24" Min.

The cabinet must be at least 20" high between the bottom frame and the inside top. If the cabinet is not 20" from bottom to inside top, a custom cabinet or modifications to a different size cabinet and/or soffit may be required to accommodate the hood housing.

  • The cabinet must be 36" wide and at least 12" deep.
  • The cabinet must be firmly secured to wall studs or the added framing support and capable of supporting 100 pounds.

GE ZV800BJBB - CABINET REQUIREMENTS - 2

text_image 10-3/4" 11-3/4" 119-1/2"

DUCTWORK, WIRING

  • Determine the exact location of the vent hood.
  • Locate the Rear Wall Template packed with the literature.
  • Measure 36" from the floor to the top of the cooking surface. Add the pre-determined hood installation height. Mark that location.
  • Use a level to draw a straight pencil line on the wall.

GE ZV800BJBB - DUCTWORK, WIRING - 1

text_image 3-3/4" centerline to wall Ceiling Top frame mounting screw locations 04 30 0000 REAR WALL TEMPLATE ALUM ON BOTTOM EDGE WITH STOCK LINE INDICATOR BOTTOM OF THE HOOD.
  • Tape the template in position along the penciled line. Check to be sure the template is level.
  • Use the level to draw a line straight up, from the centerline on the template to the ceiling.
  • Measure 3-3/4" from the back wall to the centerline of a 6-1/2" hole on the ceiling.

NOTE: If drywall is not present, add drywall thickness to the 3-3/4" dimension.

HOUSE WIRING LOCATION:

  • The junction box is located on the top right side of the hood.
  • Wiring should enter the back wall 20" to 26" above the bottom of the hood, and within 4" of the right side of the centerline. Wiring should enter at least 4" above the right side of the frame.

UNDER-CABINET INSTALLATION

1 INSTALL FRAMING FOR HOOD SUPPORT

IMPORTANT: Framing must be capable of supporting 100 lbs.

GE ZV800BJBB - INSTALL FRAMING FOR HOOD SUPPORT - 1

text_image View from rear cleats 1" x 6" min. mounting support Centerline of installation space

If drywall is present, mark the screw hole locations for the top mounting brackets. Remove the template.

  • Cut away enough drywall to expose 2 vertical studs at the bracket location indicated on the template.
  • Install a horizontal support at least 1" x 6" between two wall studs at the top bracket installation location. The horizontal support must be flush with the room side of the studs. Use cleats behind both sides of the support to secure to wall studs.
  • Reinstall drywall.

2 PREPARE THE HOOD

- Remove the hood from the box. Remove packaging and tape.

GE ZV800BJBB - PREPARE THE HOOD - 1

text_image Electrical panel Remove 2 side cover screws

- Remove one screw on each side of the cover on the electrical panel. Lift off the cover and set aside with screws.

GE ZV800BJBB - PREPARE THE HOOD - 2

text_image Junction box Inside screw Secure electrical panel with 3 screws
  • Stand the electrical panel upright.
  • Align the screw holes in the bottom of the panel with the holes on the base of the hood at the front side.
    • Install 3 screws provided.
  • Snap the damper into the exhaust outlet on the top of the hood.

GE ZV800BJBB - PREPARE THE HOOD - 3

text_image Install damper

UNDER-CABINET INSTALLATION

3 CUT THE OPENING

If the cabinet has been installed, remove it from the wall.

  • Use the Top Cabinet Template to locate and cut a hole in the bottom of the cabinet.
  • If necessary, place the template on top of the cabinet to accurately cut a matching hole.
    • Install the cabinet onto the wall.

The cabinet must be firmly secured to the wall and be capable of supporting 100 lbs.

INSTALL WOOD BLOCKS IF NECESSARY

  • Install filler blocks whenever the cabinet frame hangs below the cabinet bottom.
  • Install filler blocks whenever the cabinet bottom is less than 3/4" thick.
  • Install the filler blocks on each side of the cutout. The filler blocks will accept the hood mounting screws.

NOTE: Additional filler blocks may be required along the outside edges to accept the outside screws. See Step 5.

GE ZV800BJBB - INSTALL WOOD BLOCKS IF NECESSARY - 1

text_image Cabinet Frame. Cabinet Bottom Shelf Filler Block Equivalent to Depth of Cabinet Recess Top of Vent Hood

IMPORTANT: If filler blocks are not used, the hood may not be secured to the cabinet.

4 INSTALL SIDE "L" BRACKETS

GE ZV800BJBB - INSTALL SIDE "L" BRACKETS - 1

text_image Install 2 screws in each bracket

- Install the "L" brackets onto each side of the cutout. The wide flat portion should be on top of the opening. Install 2 screws into the top of each bracket.

5 REMOVE SIDE SCREW

The top center screw on both sides of the hood can be used to close up any noticeable gaps at the outside edges. See illustration.

GE ZV800BJBB - REMOVE SIDE SCREW - 1

text_image Remove screw cover and screw

- Remove the center screw cover and screw on each side as shown.

UNDER-CABINET INSTALLATION

6 MOUNT THE HOOD

Install a wood screw on each side of the mounting frame

GE ZV800BJBB - MOUNT THE HOOD - 1

natural_image Pure technical line drawing of a mechanical assembly with no text or symbols

- Carefully, lift the hood into the cabinet. Guide the hood upwards to meet the ductwork.

IMPORTANT: One person must hold the hood in place while the other drives the screws into the mounting frame.

7 COMPLETE THE INSTALLATION AND CONNECT DUCTWORK

GE ZV800BJBB - COMPLETE THE INSTALLATION AND CONNECT DUCTWORK - 1

text_image Install 2 Screws into

Install 2 Screws into Each Side Bracket

  • Drive 2 screws into each side bracket. Be sure the screws engage the filler blocks or the cabinet bottom.
  • Pull the glass canopy forward to access and install 2 screws through the hood and into the brackets on both sides.
  • Use duct tape to secure the duct to the exhaust outlet in the top of the hood. Do not use screws at this location.

GE ZV800BJBB - COMPLETE THE INSTALLATION AND CONNECT DUCTWORK - 2

natural_image Diagram of a device rear panel with two panels and directional arrows indicating orientation (no text or symbols)

Install original top screws

If there is a noticeable gap between the hood and the bottom of the cabinet on the sides:

- Slide canopy forward and install original top screws through the bottom of the hood and into cabinet bottom or frame.

NOTE: Install wood filler blocks if necessary to accept the screws.

UNDER-CABINET INSTALLATION

8 CONNECT ELECTRICAL

WARNING: If house wiring is not 2-wire with a ground wire, a ground must be provided by the installer. When house wiring is aluminum, be sure to use U.L. approved anti-oxidant compound and aluminum-to-copper connectors.

ADVERTISSEMENT :

  • Remove junction box cover and knockout.
  • Use a conduit connector to secure the conduit to the junction box.
  • Connect white leads to branch circuit white lead.
  • Connect black leads to branch circuit black lead.
  • Connect green/yellow leads to branch circuit green lead or bare ground lead.
  • Secure all connections with wire nuts on each electrical connector.
  • Push wires into junction box and replace cover. Be sure wires are not pinched.
  • Secure electrical panel cover with screws provided.

10 INSTALL FILTERS

- Remove protective film on the filters.

GE ZV800BJBB - INSTALL FILTERS - 1

text_image Filter Locks

GE ZV800BJBB - INSTALL FILTERS - 2

natural_image Diagram showing a black downward arrow inside a panel with a grid pattern, next to a smaller panel with a handle and grid lines (no text or symbols)

NOTE: It is not necessary to install the charcoal filter in a vented installation.

  • Tip the filter into the slots at the rear of the opening. Lift the filter lock and pull forward until the filter rests in the slots.
    • Install both metal grease filters.
  • To remove the filters, press inwards on the handle and pull the filter downwards.

9 INSTALL REAR MOUNTING SCREWS

GE ZV800BJBB - INSTALL REAR MOUNTING SCREWS - 1

natural_image Technical line drawing of a mechanical component with mounting holes and internal structure (no text or symbols)

Install 2 Wood Screws

- Pull the glass canopy forward to access and install 2 wood screws or fasteners through the bottom of the hood and into the wall.

NOTE: While performing installations described in this book, safety glasses or goggles should be worn.

For Monogram ^® local service in your area, call 1.800.444.1845.

NOTE: Product improvement is a continuing endeavor at General Electric. Therefore, materials, appearance and specifications are subject to change without notice.

Pub. No. 49-80267

10-04 JR

Printed in Italy

GE ZV800BJBB - INSTALL REAR MOUNTING SCREWS - 2

Monogram.®

GE Consumer & Industrial Louisville, KY 40225

©2004 GE Company

Table of contents Click a title to access it
Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : GE

Model : ZV800BJBB

Category : Range hood