WayteQ

XTab 8Q GPS - Tablet WayteQ - Free user manual and instructions

Find the device manual for free XTab 8Q GPS WayteQ in PDF.

📄 22 pages English EN Download 💬 AI Question 10 questions ⚙️ Specs
Notice WayteQ XTab 8Q GPS - page 6
Pick your language and provide your email: we'll send you a specifically translated version.
Product Type Tablet with GPS
Brand WayteQ
Model XTab 8Q GPS
Display Size 8 inches
Dimensions Approximately 200 x 135 x 10 mm
Weight Approximately 350 g
Battery Type Lithium-ion rechargeable
Battery Capacity 4000 mAh (typical)
Power Input 5V DC via micro USB
Operating System Android (likely version 4.x or later)
Processor 1.2 GHz quad-core
RAM 1 GB
Internal Storage 8 GB (expandable via microSD)
Connectivity Wi-Fi 802.11 b/g/n, Bluetooth 4.0
GPS Built-in GPS receiver
Ports micro USB, 3.5 mm audio jack, microSD slot
Camera Rear: 2 MP, Front: 0.3 MP
Sensors G-sensor
Maintenance Clean with soft, dry cloth; avoid exposure to liquids
Safety Do not disassemble; keep away from water and heat sources
Repairability Battery replacement should be done by a qualified technician

Frequently Asked Questions - XTab 8Q GPS WayteQ

How do I turn on the WayteQ XTab 8Q GPS for the first time?
Press and hold the power button on the side until the screen lights up. Follow the on-screen setup instructions to select language, connect to Wi-Fi, and set up your Google account.
How can I use the GPS navigation feature?
Ensure the device has GPS signal (best outdoors). Open a navigation app like Google Maps or pre-installed navigation software. The built-in GPS receiver will locate your position and provide turn-by-turn directions.
How do I insert a microSD card?
Locate the microSD slot on the side of the tablet. Insert the card with the gold contacts facing down until it clicks. To remove, press gently to eject. The tablet supports cards up to 32 GB.
What should I do if the tablet freezes or becomes unresponsive?
Press and hold the power button for about 10 seconds until the device restarts. If the issue persists, try a factory reset from the settings menu (backup data first).
How do I charge the tablet?
Connect the provided micro USB cable to the tablet and a USB power adapter. Plug the adapter into a wall outlet. The battery indicator shows charging status. A full charge takes approximately 4-5 hours.
Can I connect Bluetooth devices like headphones or keyboards?
Yes. Go to Settings > Bluetooth, turn it on, and pair your device. Ensure the external device is in pairing mode. The tablet supports Bluetooth 4.0 for wireless accessories.
How do I update the GPS maps or navigation software?
Open the navigation app and check for updates in its settings. Alternatively, visit the app store (Google Play) and update the app. For map data, ensure you have a stable Wi-Fi connection to download new maps.
What are the recommended operating conditions?
Use the tablet in a temperature range of 0°C to 40°C (32°F to 104°F). Avoid direct sunlight, high humidity, and dusty environments. Do not block the device’s ventilation.
How do I clean the touchscreen?
Turn off the tablet and unplug it. Use a soft, lint-free cloth slightly dampened with water (not wet) to gently wipe the screen. Do not use any chemicals or abrasive materials.
Is the tablet waterproof or dustproof?
No, the WayteQ XTab 8Q GPS is not rated for water or dust resistance. Keep it away from liquids, rain, and dusty environments to prevent damage.

User questions about XTab 8Q GPS WayteQ

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Tablet in PDF format for free! Find your manual XTab 8Q GPS - WayteQ and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. XTab 8Q GPS by WayteQ.

USER MANUAL XTab 8Q GPS WayteQ

Important Safety Precautions ....3

Cleaning the Panel....3

Cleaning the Tablet....3

Features....4

Buttons Overview 4

Accessories....6

What's in the Box 6

Charging the Battery 6

Power on/off and Unlock the tablet....6

II - FUNCTIONNING OF THE TABLET....7

Navigation ....7

Home Screen 7

Application Launcher Screen....7

Status Bar 8

Onscreen Keyboard 8

III - SETTINGS....9

Set Up Wi-Fi Connection....9

Set Date and Time....10

Set Up Email 11

Set Up Calendar....12

Create Shortcuts or Widgets on Home Screen....13

Change Wallpapers....13

Use folders....13

IV - CONNECTIONS ....14

Wi-Fi....14

PC Connection....14

V - APPLICATIONS....14

Camera 14

To take picture....14

To record video....14

Clock....15

Browser....16

Calculator....17

Downloads 17

Gallery....18

Music....19

Movie Player 20

FM radio....21

VI - PRODUCT SPECIFICATION....22

INTRODUCTION

First of all, thank you very much for purchasing WayteQ product!

Please read this manual carefully before using this product.

This company will connue to provide new funcons for the development of the product, and there will be no separate change in the case of any change in the product's performance and funcons.

If the actual setup and the applicaon methods are not identical to those as set forth in this manual, please access to the latest product informaon of our web site.

I - GETTING STARTED

Important Safety Precautions

Always follow these basic safety precautions when using your tablet. This will reduce the risk of re, electric shock and injury.

Warning: To reduce the risk of re of shock hazard, do not expose this product to rain or water.

Warning: To prevent the risk of electric shock, do not remove the cover. There are no user-serviceable parts inside. Opening will void your warranty.

  • Unplug the tablet before performing maintenance.
  • Keep your tablet out of direct sunlight and heat sources.
  • Protect the power cord. Route power cords so that they are not likely to be walked on or pinched by items placed on or against them. Pay parcular aenon to the point where the power cord is aached to the tablet.
  • Only use the AC adapter included with the tablet. Using any other power adapter will void your warranty.
  • Unplug the power cord from the outlet when the unit is not in charging condition.

Cleaning the Panel

Treat the screen gently. The screen is made of glass and can be scratched or broken.

To clean ngerprints or dust from the screen, it is recommended to use a so, non-abrasive cloth such as a camera lens cloth to clean the screen.

If you use a commercial Cleaning Kit, do not apply the cleaning liquid directly to the screen. Clean the screen with cleaning cloth moistened with the liquid.

Cleaning the Tablet

Clean the outer surface of the tablet (excluding the screen) with a so cloth dampened with water.

Features

The tablet includes these key features:

  • Displays Alarm, Browser, Calculator, Calendar, Camera, Clock, Email, File Browser, Gallery, Music, Seng, Movie Player and etc
  • Displays digital photos, Play Music and Video
  • Wi-Fi funcon to connect with your AP router for internet browsing
  • GPS receiver
  • Micro Secure Digital™ (micro SD) slot for external storage
  • Capacive touch screen for all user operaons
    • 4 GB Internal Memory
  • USB2.0 OTG for conneccon to the PC or USB ash drive

Buttons Overview

Technical diagram of a tablet device with labeled parts, showing front and side views with numbered annotations.

XTAB 8Q GPS 9 10 11 12

  1. Power, 2. Volume +, 3. Volume -, 4. Earphone, 5. Micro USB, 6. HDMI, 6. Micro USB, 7. Sensor, 8. Front camera
  2. Speaker, 10. Back camera, 11. SIM slot, 12. Micro SD 1.

Accessories

WayteQ XTab 8Q GPS - Accessories - 1

natural_image Line drawing of a small electrical adapter with power outlet, coiled cable, and terminal plug (no text or symbols)

Power Adapter

(depending on the regional requirement, the plug may look dierent)

WayteQ XTab 8Q GPS - Accessories - 2

natural_image Line drawing of two connected electrical probes with a coiled cable (no text or symbols)

USB Cable

What's in the Box

WayteQ xTAB 8Q Tablet PC

AC Power Adapter (5V/2A)

USB Cable, OTG adapter

Quick Start Guide

Charging the Battery

Plug the AC power adapter into tablet and into a wall outlet.

Icon will turn to icon while the baery is charging.

* It is strongly recommended you fully charge the device for about 4-6 hours before use. * When charging

baery, the baery indicator for a fully charged baery is a steady blue baery icon on the nocaon bar.

icon means the baery is sll being charged, even when 100% has been displayed for baery level on the Sengs

→ About tablet→ Status screen.

Power on/off and Unlock the tablet

The tablet is easy to set up. Just follow these steps:

  1. To power: Press and hold Power buon for 2 second.
  2. To unlock: Wait unl a screen with a lock icon shows up, gently tap the "Lock" icon and slide it toward the unlock icon.
  3. To power o: Press and hold the Power buon for 2 seconds unl "Power o" window pops up on screen where you can choose OK opon to power o the device.

Note: The screen with the lock icon will me out in 10 seconds if you do not unlock it. In case it happens, the Power buon can be pressed briefly to make it show up again.

II - FUNCTIONNING OF THE TABLET

Tablet has ve home screens by default. The rst me you turn on the tablet or aer having factory data reset, you will see a navigaon screen.

* To see all you applicaons, touch .
* You can put your favorite applicaons on Home screen.

Home Screen
6.0 THE 3D DECEPTION

A typical Home screen with wallpaper, status bar, and few applicaons at the boom.

* The background wallpaper may be dierent from model to model

◆ g shortcut to Google search
◆ shortcut to applicaon Launcher screen.

Application Launcher Screen

A typical applicaon Launcher screen is shown below. One icon represents one applicaon which can be run by tapping on the icon.

Browse Calculator Calculator Camera Clock Downloads Email File Manager File Music Runs Gallery Email Google Google Settings Matching TV Music Play Storm Search Settings Serial Recorder Videos Video Graph... Play Log MasterGPS

*The screen icon may be dierent from model to model

Status Bar

At the boom and top of the screen, the status bars mainly indicates Back icon, Home icon, Recent viewed applicaons icon, Current me, Wi-Fi status, 3G status, Bluetooth status and baery level, etc.

Mobile phone status bar with audio, home, speaker, and time control icons

IconAcon
WayteQ XTab 8Q GPS - Status Bar - 2On any funconal screen, tap this icon to go back one screen or exit applicaon.
WayteQ XTab 8Q GPS - Status Bar - 3On any funconal screen, tap this icon to go to Home screen
WayteQ XTab 8Q GPS - Status Bar - 4Shows a list of thumbnail images of applicaons you’ve work with recently. To open an applicaon, touch it. To remove a thumbnail from the list, swipe it le or right.
WayteQ XTab 8Q GPS - Status Bar - 5Current me
WayteQ XTab 8Q GPS - Status Bar - 6Wi-Fi conncon and signal strength
WayteQ XTab 8Q GPS - Status Bar - 7Baery level. Will turn orange when baery is low and turn red when baery is very low.

Onscreen Keyboard

The onscreen keyboard appears automatically anymore you tap on a text line for input. While entering text with the onscreen keyboard, each character will be entered into the posion pointed by a vercal cursor. You can change the cursor posion by tapping with your nger on the posion you want to enter the next character. To select dierent language keyboard, touch and hold icon A pop menu will show up to let you select the "Input Opons"

q w e r t y u i o p a s d f g h j k l z x c v b n m , . ?123 @ / ' - 球

Input options

Input languages

Android keyboard settings

*Seng up an Internaonal keyboard: see "Install Third-Part Applicaon" secon.

III - SETTINGS

Set Up Wi-Fi Connection

WayteQ XTab 8Q GPS - Set Up Wi-Fi Connection - 1

Make Wi-Fi Connecon In Sengs → Wireless & networks → Wi-Fi, slide the Wi-Fi switch to the I posion.

Settings WIRELESS & NETWORKS Wi-Fi Bluetooth Data usage More... DEVICE Audio profiles Display ScreenshotSetting Storage Battery Apps PERSONAL Location Security Wi-Fi Connected

Normally, the device will automatically scan the available Wi-Fi Access Point (AP). If this does not happen, select Scan (upper right corner) to scan for the available Wi-Fi APs. Then, tap on the desired AP to make the conncon. If it is a secured AP, system will prompt you for the password. Enter it by tapping on the password entry line, and use the onscreen keyboard to enter the password. Then, tap on the Connect to start conncng to that AP. When conncon is established, the Wi-Fi connected icon will show up on the status bar.

Set Date and Time

WayteQ XTab 8Q GPS - Set Date and Time - 1

Use Sengs → Data & Time to open up the data/me seng screen as shown below. Select the correct me zone. If the Wi-Fi is connected to Internet, check on the Automac to have me set up automacally. If Wi-Fi is not connected to Internet, uncheck Automac date & me to temporarily set date and me. Then, check Automac again before leaving the screen. In the future, when the Wi-Fi is connected to internet, date and me will be automacally adjusted.

Settings ScreenshotSetting Storage Battery Apps PERSONAL Location Security Language & input Backup & reset ACCOUNTS Add account SYSTEM Date & time Scheduled power on & off Accessibility Date & time Automatic date & time Use network-provided time Set date 30/09/2014 Set time 16:01 Select time zone GMT+02:00, Central European Summer Time Use 24-hour format 13:00 Choose date format 31/12/2014

Set Up Email

WayteQ XTab 8Q GPS - Set Up Email - 1

You can congregate Email for most accounts in just a few steps. For many popular email services, tablet automacally enters most of the sengs for you.

  1. Make sure the Wi-Fi is connected.
  2. Open the Email applicaon and enter your Email address and password, then tap "Next"
  3. Give a name to your account then tap "Next". Mail messages will be downloaded automacally.
IconAcon
Tap to enter E-mail compose interface
Tap to enter search interface of Inbox
Refresh
Tap to enter Account sengs. To remove your account record in tablet, tap Remove account

Set Up Calendar

WayteQ XTab 8Q GPS - Set Up Calendar - 1

Calendar makes you easy to stay on schedule. You can view your schedule in day/week/month/and agenda mode by touching icons at upper le corner. Swipe to scroll vercally or horizontally.

When using calendar for the rst me, there are some steps you shall follow:

  1. Tap Calendar icon into Gmail entering interface, then enter your Gmail account and password and tap Next.
  2. Change the Serve "gmail.com" for "m.google.com", then tap Next step.
  3. You can tap on the specific date to start using your personal calendar now.

Icons across the top:

IconAcon
TODAY, MONDAYFebruary 13, 2012Tap to see the viewing type: day/week/month/and agenda
WayteQ XTab 8Q GPS - Set Up Calendar - 2 TODAYTap to view today's schedule
[C407]Tap to show the creang events interface
WayteQ XTab 8Q GPS - Set Up Calendar - 3Tap to show more opons: Refresh/Search/Sengs

Create Shortcuts or Widgets on Home Screen

In order to access to frequently used applicaons / widgets more quickly, you can create a short cut to an applicaon / widget and place it on the Home screen. Therefore, you don't need to spend to look for it among the many applicaons / widgets on the Launcher screen.

Shortcuts

Press the applicaon icon in the Launcher screen and hold unl the icon is enlarged and background has been changed to Home screen. Then drag the enlarged icon to an empty space on Home screen and release the inger.

Widgets

Widget is a small applicaon. Aer being installed, it shows up in the main Widgets screen.

To add widgets: Touch and hold a widget, drag it to an empty space on Home screen and release your nger.

To remove shortcut / widget: Tap and hold any icon / widget on Home screen, then drag it into the Remove icon.

* If there is not enough room to drop it, the icon / widget won't get added to the Home screen.

Change Wallpapers

Tap any blank space on Home screen and hold unl a Wallpaper menu pops out. Then, you can select wallpaper.

16:02 Time is returned

Use folders

WayteQ XTab 8Q GPS - Use folders - 1

You can combine several applicaons' icon in a folder by dropping one icon over another on a Home screen.

From any Home screen, you can:

Open a folder by a slight touch.

Rename a folder by touching its name.

Move icons around your Home screens : Touch, hold, and then slide.

IV - CONNECTIONS

Wi-Fi

This tablet uses the 802.11b/g/n wireless specicaon to transmit and receive data. For more informaon, refer to “Set up Wi-Fi Connecon” on page 8.

PC Connection

Connect your tablet to a PC via USB cable. By connecng tablet to PC, you can synchronies les or transfer data directly.

  1. Plug one end of a USB cable to a tablet and plug the other end to a PC. Drag down the upper status bar at the le top corner. Choose USB connected. Tap Turn on USB storage to connect to PC.
  2. For a beer use of your tablet, tap Turn o USB storage every me you unmount USB storage.

V - APPLICATIONS

Camera

WayteQ XTab 8Q GPS - Camera - 1

Tablet allows you to take photos and video through the cameras. To change from front and rear camera tap

To take picture

Tap on the shuer buon to take a picture.

To record video

Tap on the Recording buon to start video recording. To stop recording tap .

WayteQ XTab 8Q GPS - To record video - 1

Tap to open the sengs.

Clock
WayteQ XTab 8Q GPS - To record video - 2

Aer tapping on clock icon in Launcher screen, the following screen will be shown. Tap on icon into alarm seng interface.

08:44 SAT 19 JANUARY

Browser

WayteQ XTab 8Q GPS - Browser - 1

Browser is used for browsing the World Wide Web. With the web browser plug-ins, you could browse websites to watch videos, download contents, and listen to music etc.

Google https://www.google.hu/?gfe_rd=cr&ei=XpUqVK7sAaet8wfLnIKoDw&gws_rd=ssl

Google Magyarors

User interface element with a blue search button and a blue square checkbox, likely for search or app download.

  1. Tap the address eld (in the tle bar) to bring up the onscreen keyboard, enter website address, then tap Go.
  2. Similar website previously browsed or key work previous searched will appear beneath the address eld. You can tap them to go to the web site listed or search the key word.
  3. Double tap on screen to zoom in and zoom out. Moving ngers across the screen will pan the screen up, down, le or right.

Tap Menu buon is the right-upper corner to display additional funcons at the boom of the screen.

Calculator

WayteQ XTab 8Q GPS - Calculator - 1

To perform mathemacal calculaon directly on tablet by tap numbers and symbols.

sin cos tan π ! ln log e ^ √ 7 4 1 0 8 5 2 9 6 3 . 9 ÷ × - + ( ) - = +

Downloads

WayteQ XTab 8Q GPS - Downloads - 1

Files, applicaons and other items you download from Browser or Email will be stored in your micro SD card. Use the Downloads applicaon to view, reopen or delete what you've downloaded.

  1. Touch an item in Downloads can reopen it.
  2. Check items you want to share, and then tap icon to choose a sharing method from the list.
  3. Check items you want to delete; then tap delete icon. The item will be deleted from your micro SD card.
  4. In Downloads window → Tap Sort by size or Sort by date to switch back and forth.

WayteQ XTab 8Q GPS - Gallery - 1

Tap on "Gallery" in Launcher screen to open the applicaon.

  1. The rst screen shows all photos and subfolders as albums.
  2. Tap on a picture or album into photo thumbnail mode. (Default view)
  3. Tap a thumbnail into photo single view mode.

  4. When in photo single view mode, tap anywhere on screen to show funcon bar on screen.

IconAcon
Share photos by Google/Bluetooth/Email
Go to more opons: Delete/Slideshow/Rotate le/ Rotate right/Crop photo/ Details/Set picture as

Music

WayteQ XTab 8Q GPS - Music - 1

Tap "Music" in the applicaon launcher screen to get to the song screen as below:

Artists Albums Songs Playlists Now playing Prince 1 album Ultimate 1 song

Select the Arsts/Albums/songs or playlists mode to play music. Use the onscreen icons to congregate how you want to play the songs.

IconAcon
Show playing list
Turn shue on/o funcon
Repeang all songs, current song or O
Previous song
Pause/ Stop
Next song

Note: Song will keep playing as background music while you leave the music playback screen. This funcon allows you to browse les, view photos and surf Internet while listening to music. To stop playing songs, tap on Pause on the music playing screen followed by the Back buon.

Tap in status bar to select other funcons to play the song.

Movie Player

WayteQ XTab 8Q GPS - Movie Player - 1

  1. Tap "Video" in the applicaon launcher screen.
  2. Browse the video le to play from the list.
  3. Tap video to start play.

To search in video, simply drag white bar below video. To display controls tap video, to hide controls again tap video again.

IconAcon
WayteQ XTab 8Q GPS - Movie Player - 2Play / pause
WayteQ XTab 8Q GPS - Movie Player - 3Select sound track
WayteQ XTab 8Q GPS - Movie Player - 4Select subtle
[Speed]More opons: Stop, Loop
[Speed]Full screen

FM radio

WayteQ XTab 8Q GPS - FM radio - 1

Tap „FM radió” icon in applicaon launcer screen. The screen below appears:

FM Radio FM 100.0 MHz

Turn o
Channel list. Tap channel to hear it. Tap and hold to add to favorites or delete from favorites or edit a favorite channel.
Previous channel
Next channel
Previous frequency (0.1 MHz backward)
Next frequency (0.1 MHz-et forward)
Add to favorite channels
More opons: Search, Speaker/Headphone (listen to radio through speaker or headphone), Record FM

Funcons for FM recording

Start record
Stop record. Give a name for the recording and save it
Playback recording

Tap Back buon to exit FM recording.

VI - Product Specification

General
Panel Size/Type8" IPS, 5 points capacitive touch panel
Aspect Rao16:9
Resoluon1280 x 800
CPUMTK8127 Quad-core Cortex-A7 1,3 GHz
OSAndroid 4.4
Storage
Internal memory1 GB
NAND Flash8 GB
External SD cardMicro SD up to 32GB
Connectvity
WIFI802.11 b/g/n
Bluetooth4.0
GPSBuilt in
Camera0.3 Mega pixel front / 2.0 Mega pixel back
USB OTGUSB OTG 2.0 x 1
Stereo SpeakerBuilt-in
MicrophoneBuilt-in
Earphone3.5mm Stereo Jack
Sensor
AccelerometerYes
User Interface
Hardware KeysPower
VirtualFull Touch Screen /Virtual keyboard
Extras
FM radioBuilt in
Dimension/Weight/Condion
Dimension215 x 123 x 9,2 mm
Weight360 g
Operaon Condion0°C~40°C
Storage Condion-20°C~55°C
Power
BaeryLi-Polymer Rechargeable 3,7V, 4500mAh
AC/DC Adapter100Vac~240Vac,0.5A, 50Hz-60Hz, 5V/2A
Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : WayteQ

Model : XTab 8Q GPS

Category : Tablet