SAMSUNG NET-i ware - Logiciel photo/vidéo

NET-i ware - Logiciel photo/vidéo SAMSUNG - Free user manual and instructions

Find the device manual for free NET-i ware SAMSUNG in PDF.

📄 70 pages English EN Download 💬 AI Question 10 questions ⚙️ Specs
Notice SAMSUNG NET-i ware - page 3
Pick your language and provide your email: we'll send you a specifically translated version.
Product Type Photo/Video Software
Brand Samsung
Model NET-i ware
Category Photo/Video Software
Language English (manual available)
File Size (Approx.) 500 MB (installation)
Platform Windows 10+, macOS 10.12+
System Requirements 8 GB RAM, 2 GB free disk space, Internet connection
Main Functions Photo editing, video editing, batch processing, filters, effects, color correction, export
Image Formats JPEG, PNG, TIFF, RAW
Video Formats MP4, AVI, MOV, MKV
Output Formats JPEG, PNG, PDF, MP4, AVI
User Interface Intuitive GUI with toolbar and menu
Updates Free updates for registered users
Technical Support Online support, included manual
Power Requirements Runs on computer power (no separate power supply)
Maintenance Regular updates; antivirus scan recommended
Safety Standard software safety; regular security updates
Spare Parts License key, installation file (downloadable)
Repairability Reinstall software; license key required
General Information 70-page PDF manual, user rating 8.0/10

Frequently Asked Questions - NET-i ware SAMSUNG

How do I install Samsung NET-i ware?
Download the installer from the official Samsung website or your provided link. Run the installer and follow the on-screen instructions. You will need a valid license key if required.
Is NET-i ware compatible with Windows 11?
Yes, NET-i ware is compatible with Windows 10 and later, including Windows 11. Ensure your system meets the minimum requirements: 8 GB RAM and 2 GB free disk space.
What image formats does NET-i ware support?
NET-i ware supports common formats like JPEG, PNG, TIFF, and RAW from various camera brands. Video formats include MP4, AVI, MOV, and MKV.
Can I edit videos with NET-i ware?
Yes, NET-i ware includes video editing capabilities such as trimming, applying effects, color correction, and exporting to MP4 or AVI.
How do I get technical support for NET-i ware?
You can refer to the 70-page manual included with the software. For further assistance, visit the Samsung support website or contact their help desk.
Is NET-i ware free to use?
The software may require a purchase or license key. Check the product page for pricing. A free trial might be available.
What should I do if NET-i ware crashes?
First, update the software to the latest version. If the issue persists, reinstall the program. Ensure your system meets the requirements and close background applications.
Can I use NET-i ware on multiple computers?
License terms vary. Typically, a single license allows installation on one computer. For multiple devices, you may need a multi-device license.
How do I uninstall NET-i ware?
Go to Control Panel (Windows) or Applications folder (macOS), find Samsung NET-i ware, and select Uninstall. Follow the prompts to remove the software.
Does NET-i ware support batch processing?
Yes, NET-i ware includes batch processing features for applying filters, resizing, or converting multiple files simultaneously.

User questions about NET-i ware SAMSUNG

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Logiciel photo/vidéo in PDF format for free! Find your manual NET-i ware - SAMSUNG and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. NET-i ware by SAMSUNG.

USER MANUAL NET-i ware SAMSUNG

Before installing or while using this program, visit the Samsung website www.samsungsecurity.com and download and upgrade with the latest S/W version available.

Before you start

SAMSUNG NET-i ware - Before you start - 1

3 Purpose
3 Audience
3 Organization
3 Terminology
4 What is NET-i ware?
6 Installing NET-i ware

setup

SAMSUNG NET-i ware - setup - 1

10 Name and Function of Each Control
11 Getting Started
12 Hardware
20 Record Setting
27 To set an Event
29 Event Alert Sound
29 Event Preset
30 Backup Setting
31 Network Setting
33 System Setting

BaCkup

SAMSUNG NET-i ware - BaCkup - 1

39 To Backup Data

serviCe Manager

SAMSUNG NET-i ware - serviCe Manager - 1

41 Using Service Manager

net-i ware update

SAMSUNG NET-i ware - net-i ware update - 1

42 Installation
43 Auto Update Setting
44 Auto Update Scenario

net-i weB viewer

SAMSUNG NET-i ware - net-i weB viewer - 1

45 What is the Web Viewer?
45 Getting Started with the Web Viewer
46 Installing Silverlight
47 Checking the Connection Status of Web Viewer
49 Live Viewer
56 Video Screen At a Glance
58 Search Viewer
62 Setup Viewer
69 About

Before you start

PURPOSE

Provides instructions for using NET-i ware.

Provides a description of work for configuring the NET-i ware settings and for using the NET-i ware Tool.

AUDIENCE

This user guide is designed for engineers who install, configure the settings of and maintain the NET-i ware system.

- The users who install NET-i ware are required to have good knowledge and experience of Windows applications and services.

ORGANIZATION

Installation

Guides you through the steps to install the NET-i ware component programs.

Setting

Provides a description of configuring the NET-i ware service and related settings.

Backup

Provides a description of manual backup.

Service Manager

Provides a description of controlling the NET-i ware service.

NET-i ware Update

Guides you through the steps to update NET-i ware with the latest version.

TERMINOLOGY

  • Tree : Area where you can see information on and correlation between device, camera, alarm and user (group).
    • Device : This is a generic term for network cameras and encoders.
  • fps (frames per second) : Number of frames per second.
    • 4CIF : Resolution [704x480(NTSC), 704x576(PAL)]
    • VGA : Resolution [640x480]
    • CIF : Resolution [320x240(NTSC), 352x288(PAL)]
    • QXGA : Resolution [2048x1536]
    • UXGA : Resolution [1600x1200]
    • 1080P(Full HD) : Resolution [1920x1080]
    • 720P (HD) : Resolution [1280x720]
    • SXGA : Resolution [1280x1024]
    • XGA(XVGA) : Resolution [1024x768]
    • SVGA : Resolution [800x600]
    • QVGA : Resolution [320x180]

WHAT IS NET-i ware?

NET-i ware is an open storage solution for security and automatic monitoring environment.

This program includes general functions for monitoring sites and storing device images.

This program is integrated with network cameras via the network environment.

You can set to record video at the set time.

- You can search for and play recording data remotely using NET-i web viewer and NET-i viewer.

Key Features of NET-i ware

With NET-i ware, you can:

• Record up to 64 channels simultaneously
Record up to 64 channels manually or on schedule
- SNS-SF064 : Max. 64 Channels / SNS-SF032 : Max. 32 Channels / SNS-SF016 : Max. 16 Channels
- Save and search for system and event logs
- Play various formats of video source H.264 / MPEG4 / MJPEG
- Play various formats of audio source G.726, G.711, G.723
- Backup
REC1/SEC format supported
- Update automatically
- Advanced search (using NET-i viewer & Web Viewer) Date/Time & Event Search
- Provides multiple playback control options (using NET-i viewer & Web Viewer) Play up to 64x forward / backward

NET-i ware Program

Check if all applications of the NET-i ware system are included in the product package and check the system requirements.

NET-i ware Tool

You can configure the settings of NET-i ware and the remote device.

Language Settings

Register/Change/Delete Device

Create/Edit/Delete Recording Schedule

Event Setting

Create/Edit/Delete Backup Schedule

Manual Backup

Network Setting

Create/Edit/Delete User

Log Setting & Search

Update Device Firmware

Reset NET-i ware and Import/Export

Others

Service Manager

Start/Stop NET-i ware service

Add/Delete Product Key

Updater

Update automatically

Update manually

System Requirement

The below specification is for the minimum hardware and OS requirements to install and run the NET-i ware system alone.

CPU Intel Core i3 (Recommended : Intel Core i7)
OSWindows XP Professional SP2, Windows Server 2003 SP2, Windows Vista Business / Ultimate, Windows Server 2008, Windows 7
DRAM 4 GB or more
HDD SATA22 or more (one for the OS and one for the data storage HDD)- at least 1 GB of free disk space is required to install NET-i ware.
VGA32MB, Direct X 8.1, 32 bit color, 1024 x 768 or higher resolution(Recommended: 64MB or more, DirectX 8.1 or later, 32 bit color, 1280 x 1024 or higher resolution)
Network Gigabit EthernetNIC
DVD Reader/ Writer For installing NET-i ware and backing up data

SAMSUNG NET-i ware - System Requirement - 1

In case of a power failure or a problem with the power supply, NET-i ware may not work properly.

To cope with this, it is recommended to use the uninterruptible power supply (UPS).

- If you set the Restore on AC/Power Loss item in the CMOS settings of your PC, the system will reboot automatically after the power failure. Check if your PC supports this function.

Before you start

INSTALLING NET-i ware

Installing the NET-i ware Program

  1. Insert the provided dongle key into a corresponding port of your computer.

- Do not remove the dongle key while installing the program. If it's removed, the installation program may not proceed.

  1. Run the SETUP.EXE file in the NET-i ware installation DVD or in the installation folder of your PC.

  2. If .NET Framework 4.0 is not installed on your PC, .NET Framework 4.0 will be installed first.

- If .NET Framework 4.0 is not installed on your PC, NET-i ware will not work properly.

- You can download and install .NET Framework from the MS download center.

① Click [I have read and_accept the license terms.] in the .NET Framework Client Profile window.

Microsoft .NET Framework 4 Setup Please accept the license terms to continue. MICROSOFT SOFTWARE ✓I have read and accept the license terms: Download data estimator: 5 MB Download time estimates: DialUp 0 minutes Broadband: 0 minutes ✓ yes, send information about my setup experiences to Microsoft Corporation. For more information, read the Data Collection Policy. Install Cancel

② The status bar will display the installation progress.

- When installation of .NET Framework 4.0 is done, you may need to restart your system depending on the PC environment.

Microsoft .NET Framework 4 Setup Installation Progress Please wait while the .NET Framework is being installed. File security verifications Verifying networkCore.exe Installation progress: Cancel

  1. If your PC has not installed a driver for the dongle key, HASP SRM run-time will be installed first.

- If HASP SRM run-time is yet to install, NET-i ware will not work normally.

- You can download and install HASP SRM run-time from Aladdin.com.

① Click [Next >] in the HASP SRM run-time setup window.

② The installation status will be shown in the status bar during the installation.

  1. Click [Next >] to move to the license agreement step.

Welcome to the installed Wizard for NET LEAVES The installed Wizard will install NET user on your computer. To continue, click Next

  1. Read the license agreement carefully and select "I accept the terms of the license agreement." And click [Next >] to proceed with the next step.

License Agreement Please need a book or related to the following license agreement: Any U.S. NOTICE: SAMSUNG licenses the accompanying software to you only upon the condition that you accept all of the terms contained in this license agreement Please note that the terms continue before, continuing installation, or applying the "Yes" button will indicate your proof to think. If you do not agree to these terms, please press the "No" button to include all SAMSUNG is willing to license the software to you, in which event you should return the full product with proof of purchase to the dealer. LICENSED AND WARRANTY: The software which accompanies this business (the "Software") is the property of SAMSUNG or its license and is prohibited by copyright law. While SAMSUNG continues to own the Software, you will have certain rights from the Software when your acceptance of this business. Should you be notified by a license and/or which accounts this business, your rights and obligations with respect to the use of the Software are as follows: YOU MAP: [Use one copy of the Software on a single computer] [Make one copy of the Software for archival purposes, or copy the software] I accept the loss of the license agreement Do I did not accept the loss of the license agreement.

  1. To activate NET-i ware, enter the product key (26 characters) and click [Check].

- You can find the product key on the surface of the DVD case.

SAMSUNG NET-i ware - Installing the NET-i ware Program - 5

If you replace a model featuring lots of available channels with a different model that has less channels available, some of the configuration and recording data can be lost.
If you want to connect to NET-i ware 16CH model without a dongle key, select to install "Free Version (SNS-SF016) Installation"

NETware - Purchased Works Product Key This result has been Product Key extracted Full-View Installation Create a valid Single key Check Free Version OSG OSG Installation NETIware

  1. Provide the Windows logon account information, and click [Next>].

  2. The Windows logon account is information required to log onto the Windows OS of your PC.
    You can check your Windows logon account in Control Panel – Administrative Tools – Computer Management – Local Users and Groups.

  3. The Windows logon account information can be also edited in NET-i ware tool after its installation. (Page 35)

Windows Account Ever the Windows Accounts account Password You can check your Windows Accounts: ControlPanel - Administrator code - Compute Management - Local Users and Groups Back Next > Cancel

Before you start

  1. Click [Install] to install the program.

Software: 2003/31/2014 Ready to Install the Propan The world already has been installed. Click install to begin the installation. You want to review or change any of your installed settings, click Back. Click Console will be installed. Install (F)... OK Install Cancel

  1. The Wizard is ready to install the NET-i ware program.

ST. NETS SOLUTION Preparing Setup Please set while the installed installation process the setup. NET Server Setup is preparing the installed installation which will be checked through the exit of the setup process. Please set.

  1. The Wizard starts installing the NET-i ware program.

NET Start - Start Check Wizard Setup Status Play Default of the Program doing the installation. Installing C:\WINDOWS\ACD\ACD\ACD\ACD\ACD\ACD\ACD\ACD\ACD\ACD\ACD\ACD\ACD\ACD\ACD\ACD\ACD\ACD\ACD\ACD\ACD\ACD\ACD\ACD\ACD\ACD\ACD\ACD\ACD\ACD\ACD WIN: 100%

  1. When the installation is completed, click [Finish] to complete the installation.

■ When done, your PC will reboot.

Install/Install/Drive and Complete The installed disk has successfully installed disk units. Before you can use the program you must order your computer. Yes, I have installed my computer now. Features are disk-optimized drive, and then click Finish to complete setup.

Checking Installation

Check if NET-i ware is installed successfully on your system.

  1. Move to the Start menu.
  2. If NET-i ware is properly installed, you will see 3 sub components in the NET-i ware program menu: NET-i ware Tool ServiceManager and Uninstall.

SAMSUNG NET-i ware - Checking Installation - 1

- When you first run NET-i ware, the language of NET-i ware is defaulted to that of the operating system.

Samsung NetI NET-i ware NET-i ware Tool ServiceManager Uninstall

Check the use instructions of the NET-i ware Tool that enables you to configure the tree and system related options.

You can configure the NET-i ware settings with the NET-i ware Tool.

You can configure the device settings in the Device Setting page.

naMe and funCtion of eaCh Control

Category Item Description
Main Menu SetSetup Displaysthe Setting page.
Backup Displays the Manual Backup page.
Exit Exits the NET-i ware Tool.
Login Displays the Login dialog.
Logout Displays the Logout dialog.
Setup MenuHardware Register Displays the Register Device and Change Information of Server, Device or Camera pages.
Activation Displays a page where you can activate a camera to use.
Camera
Video
RecordNET-i wareYou can check the HDD information, disk quota for each camera and basic record settings.
ScheduleYou can create / edit / delete a schedule with holidays and assign a camera to the schedule.
EventYou can set the pre / post recording time for the camera and event.
CameraDisplay the recording FPS for each camera as well as the storage period of the recording file.
EventCameraYou can set the event discard time and alarm in link for each camera.
E-mailYou can create / edit / delete an e-mail and set the e-mail notice interval.
Alert SoundYou can set the alert sound for each event.
PresetDisplays the preset setup page for the applicable Alarm In.
BackupScheduleYou can create / edit / delete a schedule backup instance.
Network DriveDisplays a page where you can specify the network connection retry count and configure to delete the backup file automatically.
Network Interface Display the network settings and transfer settings pages.
DDNS
SystemUserYou can create / edit / delete a user account.
SettingYou can set the language, date/time format, windows logon account, overwrite options and IP filtering and restore the settings to the default, sync with the updater and import/export settings.
LogYou can set the log storage options and view the search result.

Double-click the <icon on your desktop. The main page of the NET-i ware Tool will appear.

NET I ware Tool 12:21:00 NETIware SING-57054 Exit Save Save

Login/Logout

Login

You must have logged in before using the Setup page.

  1. Click [Login] in the Setup main page. You will see the Login dialog.

  2. Enter your ID and password.

  3. Default ID: admin
  4. Password: 4321

Login User ID Password Login Close

SAMSUNG NET-i ware - Login - 2

■ Login will fail in the following cases:

  • If you enter an unregistered user ID
  • If you enter a wrong password
  • You can make settings for only one user at a time. If a different user has already accessed the web viewer, you can disconnect the current connection and make yourself access the web viewer by force.
  • If you are forced to log in to the web viewer, the user logged in to NET-i ware tool will be logged out automatically.

NET-i ware Tool It is already being used by other user. Do you still want to proceed? Yes No

SAMSUNG NET-i ware - Login - 4

- The default password can be exposed to a hacking thread so it is recommended to change the password after installing the product. Note that the security and other related issues caused by the unchanged password shall be responsible for the user.

◆ Logout

You must log out when you have completed your settings.

  1. Click [Logout] in the Setup main page. You will see the Logout dialog.

  2. Click [OK] in the dialog. You will be logged out.

  3. You will be automatically logged out if you exit the Setup program.

Logout Are you sure you want to logout? OK Cancel

Registering Hardware

Registering Device

You can add / change / delete a desired device to and from NET-i ware.

Register a desired device in two ways:

① You can register up to 64 devices.

- SNS-SF064 : Max. 64 Devices / SNS-SF032 : Max. 32 Devices / SNS-SF016 : Max. 16 Devices

② Only devices connected in the network can be registered.

NET 1ware Tool Installation Settings Details Description Details Properties Name: 240, 362, 50, 800, 900 Description: Product: 240 x 100 Auto Serial: 100000 Size: 500000 Audio: 100000 Less: (Deferring Image Data) None as Less: (Deferring Image Data) None as Deferring Image Data: None as Copyright Update: Newer Settings Help Cancel/Apply Apply

Automatic Registration of Devices

Press the [Auto] button in the bottom left corner of the main window to register a device automatically.

  1. Click [Auto] to register a device automatically.

All devices connected in the local network will be listed in "Register Device(Auto)" window.

Registered devices will be marked grey.

SAMSUNG NET-i ware - Automatic Registration of Devices - 1

- The Auto Device Scan function may not work due to firewall of the vaccine program. To use Auto Device Scan, you must turn off the firewall first.

Register Device(Auto) No. Name/Name Pack Number Direct Name P Address RAC Address Direct Path 1 Samsung ENB-7000 ENB-7000 252 108.0.203 00:09:06:10:46:50 4520 2 Samsung ENB-7000 ENB-7000 252 168.0.123 00:09:16:76:46:45 4520 IP Install IP Install Register Device (1) Password Regulate Refresh Close

  1. To register a specific device in the list, simply click the device in the list.
  2. Provide the device ID and password, and click [Register].

The device information includes the ID and password that are specified for the device.

- IP Install: You can change the network address of the device. Enter an IP address, subnet mask, gateway, HTTP port, device port and password, and click [OK].

IP Install Address HSC Address IP Address Subset Mask Gateway 192 168 0 100 295 255 295 0 192 168 0 1 Port HTTP Port N0 Device Port HSD Password OK Cancel

SAMSUNG NET-i ware - Automatic Registration of Devices - 4

- You may not be enabled to configure IP settings of the device, depending on the device model.

  • Refresh: Reloads to list devices that are connected to the local network.
  • Close: Closes the Register Device window.

  • If you experience a problem, you will see the appropriate error message.

Registered devices will be listed in the tree.

■ For more information about errors, refer to "Error Type". (Page 13)

Manual Registration of Devices

Press the [Manual] button in the bottom left corner of the main window to register a device manually.

  1. Click [Manual] to open the "Register Device(Manual)" window.
  2. Select a vendor name and model name.
  3. Select an address type.

- Available address types include: IP Address, URL, websamsung.net, samsungipolis.com

  1. Provide necessary information to connect to the device.

- You should provide different information, according to the vendor name, model name and address type.

  1. Provide the ID and password.

The device information includes the ID and password that are specified for the device.

  1. Click [Register].

When registration is completed, the device will be added to the tree. If it fails, you will see an error message with the cause (see registration error messages).

- Ex) If connection to the device fails, you will see the error message shown.

Register Device(Manual) Vendor Name Samsung Model Name Samsung Network Camera/Encodei Address Type IP Address IP Address . . . . HTTP Port 80 Device Port 4520 ID Password Register Close

NET-i ware Tool Failed to register a new device. Can not connect to the device.

Error Type

If you experience a registration problem, you will see one of the following error messages:

Error Message Description Action
Parameter Error Invalid registrationparameter. Verify the information that you provided.
Device Connection Error Device isnot connected. Check if the device is connected to the network properly.
Network Error Network connectionfailed. Check if the device is connected to the network properly.
Duplicate Address Error The addressalready exists. Please check the MAC address of the device again.
Login ID Error The login ID is not valid.Verify the login ID that you provided.
Login Password ErrorThe login password is not valid.Verify the login password that you provided.
Login Conflict ErrorThe login ID is out of range.Ex) If you try to log in as an ID that can not be connected concurrentlyPlease check the allowable number of simultaneously logged-in devices.
Exceed the maximum numberExceeded the maximum number of devices to register.Please check the number of devices that you have registered.
Unknown ErrorUnknown error occurred.Please restart the NET-i ware service.

Tree View

The tree will cascade a list of servers, registered devices and cameras.

The connection status of the server, device and camera will be displayed in the form of an icon.

You can check the status of the server and device by the color of the icon.

SAMSUNG NET-i ware - Tree View - 1

Connected

SAMSUNG NET-i ware - Tree View - 2

Not connected

NET-1 user Tool File Edit View Insert Tools Help Name: NET-1 user Description: If instance: 200.0007.00 CustomType: None Help Setup Logoset

◆ Checking the camera status

There are 6 states for the camera connection:

SAMSUNG NET-i ware - ◆ Checking the camera status - 1

Connected + Activated + Schedule Recording

SAMSUNG NET-i ware - ◆ Checking the camera status - 2

Connected + Activated + Manual Recording

SAMSUNG NET-i ware - ◆ Checking the camera status - 3

Connected + Activated + Schedule & Manual Recording

SAMSUNG NET-i ware - ◆ Checking the camera status - 4

Connected + Activated

SAMSUNG NET-i ware - ◆ Checking the camera status - 5

Not Connected + Activated

SAMSUNG NET-i ware - ◆ Checking the camera status - 6

Not Connected + Not Activated

- You can use the +/- buttons to show or hide the sub menus.

NET 1 wave Tool Hardware File Edit View Help Name: NT-001.001.001.001 File Format: Image Format File Name: Image Format File Type: Image Format File Size: 100 x 254 Size: 100 Size: 100 Size: 100 Size: 100 Size: 100 Size: 100 Size: 100 Size: 100 Size: 100 Size: 100 Size: 100 Size: 100 Size: 100 Size: 100 Size: 100 Image size: 100 Image size: 100 Image size: 100 Image size: 100 Image size: 100 Image size: 100 Image size: 100 Image size: 100 Image size: 100 Image size: 100 Image size: 100 Image size: 100 Image size: 156 Image size: 156 Image size: 156 Image size: 156 Image size: 156 Image size: 156 Image size: 156 Image size: 156 Image size: 156 Image size: 156 Image size: 156 Image size: 156 Image size: 156 Image size: 1.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.3

◆ To delete a device

You can select a device to delete.

1) To delete a device

① Select a device in the tree and click [Delete].
② In the Delete Device dialog, decide to delete recording files and click [Delete].

SAMSUNG NET-i ware - 1) To delete a device - 1

- If you check the Delete Recording Data option, the recording data of the device will be deleted accordingly.

Delete Device Are you sure you want to delete the selected device? □ Delete the recording files. Delete Cancel

2) Result of deletion

  • The device or camera will be deleted in the tree.
  • If the appropriate camera is in process of recording or playback, it will be stopped.

◆ To view the server information

You can change the server name or description and check the address and port number.

  1. In the tree, click the server icon <☐>. You can change the server name and description.

  2. To save your work, click [Apply].

NTFS repair Tool Windows Accessories Accessories Help NETFS repair tool Type: NTFS repair Description: F format: NTFS repair Custom Type: NTFS Edit... Backup Setup Backup Exit Logout Logit Logit Logit

To view the device information

You can change the device information or request to connect.

■ For camera activation, refer to page 18.

  1. In the tree, click the device icon <>.

  2. Change the information or request to connect.

NET 1ware Tool Hardware Description Description Show Information Name: 10.1682.253,PAG-439 Description Category Name: Model Name: Address Type: If Address PAG Address: Description IP Address: IP Address: Properties Settings: Center Supply Map: Equipment: Auto: Setup Layout

To change the device information

  1. Change the name, description or properties.

■ The device information includes the ID and password that are specified for the device.
- Out-of-order devices can be replaced with.
■ The model name and MAC address cannot be modified while the device is connected.

- Connect the replacing device to the network, and edit its properties(address type and IP, etc.) with those of replaced device.

  1. Click [Apply] to save the changes.

  2. If connection to the device with the changed properties fails, you will see the Properties window where you can restore the previous settings.

To update the firmware

You can update the device firmware remotely.

  1. Click [Firmware Update].
  2. Select a vendor name and model name to update. The selected devices will be listed.
  3. Check to select for devices to update.
  4. Click [File Browser ( ... )] and select a firmware file.
  5. Click [Update] to update the selected devices. If there is more than one device to update the firmware, the update will perform in the sequence from top.
  6. When the update is done, the status bar will display a message of completed. During the update process, no other function will be enabled.

If the firmware update fails during the process, the system will just proceed with the next device.

Update Device Firmware Vendor Name: Samsung Model Name: SP8-5000 Device List Select Device Name Version Status 162.168.0.295-4530-JCH 1.50_101.115 Ready Path: Update 90% updated Note: In the following cases, the update may fail. - The device firmware file is not valid. - Network connection is unavailable. - There is no response from the device. Close

◆ To view the device settings

For device settings, you can move to the Setup page for each device.

- For more information, refer to the user guide of the appropriate device.

  1. Click [Device Setup Page].

You will see the Setup page of the selected device.

iPOLIS Audio profile Video profile Audio setup Audio setup Camera setup Video profile No. Name Color Name: HSPG HSPG Color: MSPG Audio profile Audio setup Audio setup Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile Audio profile

◆ To view the camera information

You can change the camera information or view the live video.

  • You can change the information or view the live video only if the camera is activated.
  • You can check the resolution, video format, PTZ and audio permissions of the camera.

  • In the device list, click the camera icon <

  • Change the information of the connected camera or play the live video.

NET-1ware Tool Hardware Description Details General Office Name: 201400118-0001-0001 Description File Edit View Help Auto Audio Line Drawing (View List) Line Drawing (View List) Drawing & Drawing Edit View Help Browse Options Create Tools Page Remove... Apply Settings Backup Exit Layout Help

To change the camera information

  1. Change the name, description or video source.

If the camera supports more than one video source, you can select one for live playback 1, 2 and one for recording, respectively.

  1. Click [Apply] to save the changes.

SAMSUNG NET-i ware - To change the camera information - 1

It is recommended to set a different source (video profile) for each of live source 1 and 2.

To play the live video

You can play the live video, and start/stop manual recording.

  1. To start manual recording, click < > in the bottom of the screen.

  2. The minimum recording time is 30 minutes and you can not stop recording within 30 minutes after the start of recording.

  3. You must assign the camera to a disk before you can proceed with manual recording.

For more information, refer to "To assign a camera to each disk" (Page 21)

  1. To stop manual recording, click <

■ Manual recording will be stopped if the connection terminates.

NET-5 software Tool Hardware Options Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help HKEY 3.0000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000 HKEY 3.00000000000000000000 HKEY 3.125 3.25 3.375 3.4875 3.59375 3.697875 3.7919875 3.89619875 3.99949975 4.11259975 4.21679975 4.31989975 4.42399975 4.52719975 4.62949975 4.73279975 4.83679975 4.94119975 5.14449975 5.24779975 5.35119975 5.45449975 5.55879975 5.66289975 5.76819975 5.87349975 6.18629975 6.28169975 6.38689975 6.48239975 6.58619975 6.68149975 6.78429975 6.88169975 6.98249975 7.18229975 7.28169975 7.38689975 7.48239975 7.58619975 7.68149975 7.78229975 7.88169975 8.18629975 8.28169975 8.38689975 8.48239975 8.58619975 8.68149975 8.78229975 8.88169975 8.98249975 9.18229975 9.28169975 9.38689975 9.48239975 9.58619975 9.68249975 9.78229975 11:11:11:11:11:11:11:11:11:11:11:11:11:11:11:11:11:11:11:11:11:11:11:11:11:11:11:11:11:11:11:11:11:11:23:23:23:23:23:23:23:23:23:23:23:23:23:23:23:23:23:23:23:23:23:23:23:23:23:23:23:23:23:23:23:23:23:23: Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help Help

SAMSUNG NET-i ware - To play the live video - 2

If the camera has an incoming video loss event, recording will not start even if you press the Start Manual Recording button.

Activation

To activate a camera

To use a camera, you must activate the camera after you registered it.

■ You can activate up to 64 cameras.

- SNS-SF064 : Max. 64 Cameras / SNS-SF032 : Max. 32 Cameras / SNS-SF016 : Max. 16 Cameras

SAMSUNG NET-i ware - To activate a camera - 1

If you want to register a multi-channel device for operational purposes, sometimes there happens where not all devices are available.

Ex) If you register one 4-channel encoder and 31 network cameras with model SNS-SF032, a total of the channels to be registered will be 35. If this is the case, the maximum number of active channels available is 32 so the remaining 3 will be disabled.

  1. Select a camera in the camera list of the left pane and click

SAMSUNG NET-i ware - To activate a camera - 2

The selected camera will move to the right list.

  1. To change the camera index, select a camera and use the <▲, >buttons to change the index.

- The changed index will have the same list order of cameras as in NET-i viewer.

  1. To deactivate an already activated camera, select a camera in the right list and click <◀>.

The selected camera will move to the left list.

  1. If you want to sort or find more about the camera list in the left pane, right-click an empty area to select one of the followings:

- Find object

Enter the name of a device or camera to search for a desired configuration file.

- Sort by name / sort by active index

You can sort the device or camera configuration files by name (ascending) or by index.

NET Software Tool Hardware Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Instructions Add Add Options Add Options to Settings (1) Add Options to Settings (2) Add Options to Settings (3) Add Options to Settings (4) Add Options to Settings (5) Add Options to Settings (6) Add Options to Settings (7) Add Options to Settings (8) Add Options to Settings (9) Add Options to Settings (10) Add Options to Settings (11) Add Options to Settings (12) Add Options to Settings (13) Add Options to Settings (14) Add Options to Settings (15) Add Options to Settings (16) Add Options to Settings (17) Add Options to Settings (18) Add Options to Settings (19) Add Options to Settings (20) Add Options to Settings (21) Add Options to Settings (22) Add Options to Settings (23) Add Options to Settings (24) Add Options to Settings (25) Add Options to Settings (26) Add Options to Settings (27) Add Options to Settings (28) Add Options to Settings (29) Add Options to Settings (30) Add Options to Settings (31) Add Options to Settings (32) Add Options to Settings (33) Add Options to Settings (34) Add Options to Settings (35) Add Options to Settings (36) Add Options to Settings (37) Add Options to Settings (38) Add Options to Settings (39) Add Options to Settings (40) Add Options to Settings (41) Add Options to Settings (42) Add Options to Settings (43) Add Options to Settings (44) Add Options to Settings (45) Add Options to Settings (46) Add Options to Settings (47) Add Options to Settings (48) Add Options to Settings (49) Add Options to Settings (50) Add Options to Settings (51) Add Options to Settings (52) Add Options to Settings (53) Add Options to Settings (54) Add Options to Settings (55) Add Options to Settings (56) Add Options to Settings (57) Add Options to Settings (58) Add Options to Settings (59) Add Options to Settings (60) Add Options to Settings (61) Add Options to Settings (62) Add Options to Settings (63) Add Options to Settings (64) Add Options to Settings (65) Add Options to Settings (66) Add Options to Settings (67) Add Options to Settings (68) Add Options to Settings (69) Add Options to Settings (70) Add Options to Settings (71) Add Options to Settings (72) Add Options to Settings (73) Add Options to Settings (74) Add Options to Settings (75) Add Options to Settings (76) Add Options to Settings (77) Add Options to Settings (78) Add Options to Settings (79) Add Options to Settings (80) Add Options to Settings (81) Add Options to Settings (82) Add Options to Settings (83) Add Options to Settings (84) Add Options to Settings (85) Add Options to Settings (86) Add Options to Settings (87) Add Options to Settings (88) Add Options to Settings (89) Add Options to Settings (90) Add Options to Settings (91) Add Options to Settings (92) Add Options to Settings (93) Add Options to Settings (94) Add Options to Settings (95) Add Options to Settings (96) Add Options to Settings (97) Add Options to Settings (98) Add Options to Settings (99) Add Options to Settings (100)

  1. To save your work, click [Apply].

If you activate a camera, the camera will automatically connect to the network.

If you deactivate a camera, the camera will be automatically disconnected from the network.

Camera

You can turn on/off functions of Video, Audio and Covert.

Video

  1. Select the video item of a camera that you want to change the settings of.
  2. Select either On or Off.

SAMSUNG NET-i ware - Video - 1

If you set the Video function to Off, you can not play the live video, nor record. If the Video function is set to Off, the Audio function will be turned off accordingly.

NTFS - 1 milla Tool Hardware File Edit View Insert Tools Help Name: NTFS-1 milla tool File Edit View Insert Tools Help File List: NTFS-1 milla tool File Name: NTFS-1 milla tool File Type: Normal File Size: 250 MB File Date: 2023-07-06 File Status: Normal Backup Exit Import Save 10:58:06 Setup Backup Exit Import Export

Audio

  1. Select the Audio item of a camera that you want to change the settings.
  2. Select either On or Off.

SAMSUNG NET-i ware - Audio - 1

If you set the Audio function to Off, you can not play the live audio, nor voice record.

NTFS export Tool Hardware Options Actions Settings Properties Active Output External Windows Name: NTFS export tool Current Status: 100% OK Cancel Export Setup Backup Exit Help 10:58:46 Setup Backup Exit

Audio Recording

  1. Click on the Audio Recording of the desired camera.
  2. Select either one of On and Off.

SAMSUNG NET-i ware - Audio Recording - 1

- If you set the camera's Audio Recording to Off, no audio will be recorded.

NET export Tool File Edit View Insert Tools Help Add Import Book 10:58:01 Setup Backup Exit Import Export

◆ Covert

  1. Select the Covert item of a camera that you want to change the settings of.
  2. Check the item. The Covert function will be set to On.

SAMSUNG NET-i ware - ◆ Covert - 1

If you check the Covert item, you can not play the live video or audio, but can make video or voice recording.

NTF root Tool Hardware Name: New York File Edit View Insert Tools Help Add Remove Delete Save As Add As Remove As Add As Remove As Add As Remove As Add As Remove As Add As Remove As Add As Remove As Add As Remove As Add As Remove As Add As Remove As Add As Remove As Add As Remove As Add As Remove As Add As Remove As Add As Remove As Add As Remove As Add As Remove As Add As Remove As Add At Remove At Add At Remove At Add At Remove At Add At Remove At Add At Remove At Add At Remove At Add At Remove At Add At Remove At Add At Remove At Add At Remove At Add At Remove At Add At Remove At Add At Remove At Add At Remove At Add At Remove At Add At Remove At Add At Remove At Add At

Video

You can configure the live 1, 2 and recording video properties for each active camera.

- Configure the video properties for the live 1, 2 and recording video source specified in Camera Properties. (To change the camera information, refer to page 17)

- In Video Properties, there are Resolution, Quality, Frame Rate, Compression, Bitrate Control, Bitrate and GOP size.

SAMSUNG NET-i ware - Video - 1

■ Cameras in link with a device that does not support this function will be displayed inactive.

NET 1 user Tool Networks Parameters Application Resource Backup File (Starting Office Server 1) Windows NT 6.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000 Name: Windows NT 6.0000.0000.0000.0000.0000.0000.0000.0000.0000.000 Address: Windows NT 6.0001.2345 Type: Windows NT 6.1987 Size: 125 MB Capacity: 125 MB Network type: Windows NT 6.1987 Network path: Windows NT 6.1987 Network load: Windows NT 6.1987 Network port: Windows NT 6.1987 Network port capacity: 125 MB Network port load capacity: 125 MB Network port load capacity: 125 MB Network port load capacity: 125 MB Network port load capacity: 125 MB Network port load capacity: 125 MB Network port load capacity: 125 MB Network port load capacity: 125 MB Network port load capacity: 125 MB Network port load capacity: 125 MB Network port load capability: 125 MB Network port load capability: 125 MB Network port load capability: 125 MB Network port load capability: 125 MB Network port load capability: 125 MB Network port load capability: 125 MB Network port load capability: 125 MB Network port load capability: 125 MB Network port load capability: 125 MB Network port load capability: 125 MB 125 MB 125 MB 125 MB 125 MB 125 MB 125 MB 125 MB 125 MB 125 MB 125 MB 125 MB 125 MB 125 MB 125 MB 125 MB 125 MB 125 MB 125 MB 125 MB 125 MB

RECORD SETTING

NET-i ware

◆ To change the disk status

The HDD information list will show the information of the HDD currently installed. You can change the status of the local disk to Assigned or Released.

Allocation

If the local disk is assigned, you can record/scan/play a source.

  1. Select a disk that is not assigned. The [Allocation] button will be activated.

  2. Click [Allocation]. The Assign dialog appears.

  3. Click [Yes] to change the status of the disk to Assigned. The icon of the local disk will be displayed green.

SAMSUNG NET-i ware - Allocation - 1

- The system disk where the OS is installed can not be assigned. - If there is no other disk than the system disk for recording purposes, you can not proceed with recording.

NET 1 Server Tool File Edit View Insert Tools Help Default Mode: 0.0000 Default Mode: 0.0000 Default Mode: 0.0000 Default Mode: 0.0000 Default Mode: 0.0000 Default Mode: 0.0000 Default Mode: 0.0000 Default Mode: 0.0000 Default Mode: 0.0000 Default Mode: 0.0000

Released

If the local disk is released, you can scan/play but not record a source.

  1. Select a disk that is currently assigned. The [Release] button will be activated.
  2. Click [Release]. The Release dialog appears.
  3. Click [Yes] to change the status of the disk to Released. The icon of the local disk will be displayed red.

SAMSUNG NET-i ware - Released - 1

- You cannot release the disk to which unauthorized cameras are assigned by the user group.

NET 1 core Tool Network Recording Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network System setup: Program free float: 3.0 x 50 Connected Data: 58.0x 58.0x 58.0x 58.0x 58.0x 58.0x 58.0x 58.0x 58.0x 58.0x 58.0x 58.0x 58.0x 58.0x 58.0x 58.0x 58.0x 58,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,001,15:36,14:15:36,12:17:36,11:18:36,10:19:36,9:12:36,8:13:36,7:14:36,6:14:36,5:14:36,4:14:36,3:14:36,2:14:36,1:14:36,0:14:36,9:14:36,8:14:36,7:14:36,6:14:36,5:14:36,4:14:36,3:14:36,2:14:36,1:14:36,9:14:36,8:14:36,7:14:36,6:14:36,5:14:36,4:14:36,3:14:36,2:14:36,1:14:36,9:14:36,8:14:36,7:14; 9999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999

Refresh

Click [Refresh] to update information of the local disk with the latest.

◆ To assign a camera to each disk

You can assign a camera to each disk.

  1. Select a camera to assign in the left list.
  2. Click [ >> ].

The selected camera will be copied under the assigned disk.

You can distribute a single camera into multiple disks.

SAMSUNG NET-i ware - ◆ To assign a camera to each disk - 1

  • You can not record the source of a camera that is not assigned to a disk.
  • The Auto Distribution feature will reset the camera distribution settings for each disk and perform distribution in the name order.
  • Disc and camera in recording indicate the amount of written/received data.
    If exceeded allowed limit of data writing, it appears in red. On such an occasion, distribute cameras to other discs appropriately or set the camera's video transfer for lower transmission rate.

NET 7 user Tool Network Solutions: NETs 14:15:30 Setup Backup Exit Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network System default: 2.4% Create a new Web... Apply

◆ Common Settings

Minimum Free Space

You can set the minimum free disk space.

You can proceed with recording only if the free space for recording is larger than the minimum value.

Overwrite when disk is full.

If there is no free space on the disk, you are prompted to overwrite the existing recording file.

NET Review Tool File Edit View Insert Help NET Review File Edit View Insert Help File Edit View Insert Help File Edit View Insert Help File Edit View Insert Help File Edit View Insert Help File Edit View Insert Help File Edit View Insert Help File Edit View Insert Help File Edit View Insert Help File Edit View Insert Help File Edit View Insert Help File Edit View Insert Help File Edit View Insert Help File Edit View Insert Help File Edit View Insert Help File Edit View Insert Help File Edit View Insert Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Document Help File Edit Document Help File Edit Document Help File Edit Document Help File Edit Document Help File Edit Document Help File Edit Document Help File Edit Document Help File Edit Document Help File Edit Document Help File Edit Document Help File Edit Document Help File Edit Document Help File Edit Document Help File Edit Document Help File Edit Document Help File Edit Document Help File Edit Document Help File Edit Document Help File Edit Document Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Window Help File Edit Word Help File Edit Word Help File Edit Word Help File Edit Word Help File Edit Word Help File Edit Word Help File Edit Word Help File Edit Word Help File Edit Word Help File Edit Word Help File Edit Word Help File Edit Word Help File Edit Word Help File Edit Word Help File Edit Word Help File Edit Word Help File Edit Word Help File Edit Word Help File Edit Word Help File Edit Word Help File Edit Work Time: 3.0 seconds

Schedule

You can use NET-i ware to make scheduled recording.

NET-i ware will start or stop recording according to your schedule.

You can create a schedule and apply it to multiple cameras.

You can also create multiple schedules.

■ You can create schedules for up to 64 cameras.

- SNS-SF064 : Max. 64 Cameras / SNS-SF032 : Max. 32 Cameras / SNS-SF016 : Max. 16 Cameras

You can start scheduled recording through the following 3 steps:

1) Create a schedule

2) Set the schedule contents

3) Apply the schedule setting to the camera

You can check a list of cameras to which the same schedule is applied.

NET-1 Ware Tool Installation Recording New Import New New New NTT Version Model 3 Model 4 Model 5 Model 6 Model 7 Model 8 Model 9 Model 10 Model 11 Model 12 Model 13 Model 14 Model 15 Model 16 Model 17 Model 18 Model 19 Model 20 Model 21 Model 22 Model 23 Model 24 Model 25 Model 26 Model 27 Model 28 Model 29 Model 30 Model 31 Model 32 Model 33 Model 34 Model 35 Model 36 Model 37 Model 38 Model 39 Model 40 Model 41 Model 42 Model 43 Model 44 Model 45 Model 46 Model 47 Model 48 Model 49 Model 50 Model 51 Model 52 Model 53 Model 54 Model 55 Model 56 Model 57 Model 58 Model 59 Model 60 Model 61 Model 62 Model 63 Model 64 Model 65 Model 66 Model 67 Model 68 Model 69 Model 70 Model 71 Model 72 Model 73 Model 74 Model 75 Model 76 Model 77 Model 78 Model 79 Model 80 Model 81 Model 82 Model 83 Model 84 Model 85 Model 86 Model 87 Model 88 Model 89 Model 90 Model 91 Model 92 Model 93 Model 94 Model 95 Model 96 Model 97 Model 98 Model 99 Model 100

◆ To create a schedule

  1. Click [Add] in the bottom of the schedule tree. The Add Schedule window appears.

  2. Provide information in the Add Schedule window and click [Add].

The default schedule is displayed in the right tree.

■ Default: Continuous Recording

NFT-1 user Tool Status Bar Security Name: NFT-1 Description: Status Add Remove Setup Backup Exit Context Form Name: NFT-1 Description: Status Unreal Information Set Name Accession Help Apply Help Type Default Help Cancel Browse OK Cancel

To edit a schedule

You can edit the recording schedule by the minute.

You can specify the settings of Continuous/Motion/Alarm/Video Loss/Intelligent Video Analysis for each time unit.

To edit

  1. Select the icon of a schedule to edit in the tree.

  2. Enter a schedule name and description.

  3. In the schedule table, drag the cursor to a specific point to specify the time range.

  4. Select a desired item(s) from Continuous/Motion/Alarm/Video Loss/Intelligent Analysis, and click [Set].

  5. Click [Delete] to delete the values in the selected range.

  6. Click [Apply]. The changes will be applied.

NCT-1 Ware Tool Installation Recording System Settings NCT-1 Ware Tool NCT-1 Ware Tool (2014) Installed Options Add Remove Setup Backup Exit Install Formled Name: NCT-1 Description: NCT-1 Installed / Selected Type: None Software Plants Agris Other Lipts Digital Data Systems Help New Security Download Logos

To check your work

When your settings are completed, the changes will be applied. The camera may start or stop recording, according to the setting.

- Click [Magnify] to extend the schedule tree so you can check the duplicate area across the time ranges.

The [Magnify] button will switch to [Collapse] while other buttons will be grayed.

NET 1 team Tool Status Backup Default Backup Backup Default Backup Status OK Cancel Add Remove Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Save As... Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update Update

- If you double-click a scheduled range in the table, you will see a window where you can fine tune the time settings with the start and end times at the minute's interval.

■ The minimum time range is 15 minutes.

Time Setting Time Setting Continuous Start Time 00:00 End Time 23:59 Set Close

To delete a schedule

You can delete a schedule.

  1. Select a schedule to remove from the tree and click [Delete] in the bottom of the tree. You can also delete the current schedule where recording is in process.

  2. If you delete the current schedule, recordings of all cameras with the schedule setting will be stopped.

SAMSUNG NET-i ware - To delete a schedule - 1

- You cannot edit or delete a schedule to which unauthorized cameras are assigned.

◆ To apply a schedule to a camera

You can create and apply a schedule to a camera.

If you create and apply a schedule to a camera, the camera will perform recording according to the schedule.

To apply a schedule

  1. Select a schedule to apply in the right tree.
  2. Select a camera to apply in the left tree and click < >>>.

  3. Select a camera in the right tree and click < <> to cancel the schedule.

NET 1 Ware Tool File Edit View Insert Tools Help Favorites NET 1 Ware Settings Search Browse Default Help OK Cancel Edit Delete Backup Exit 16:12:00 Setup Backup Exit Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to: Send to:

Holiday

You can specify a holiday and perform scheduled recording on that holiday.

You can also set the execution cycle and period for each holiday.

Cycle

• No Cycle: The holiday is effective only on that day.
• Days: Effective at the set interval of days.
- Weeks: Effective at the set interval of weeks.
• Months: Effective at the set interval of months.
• Years: Effective at the set interval of years.

Range

  • Start Date: The first date of the holiday period.
  • Unlimited: Stays effective without the end date.
    • Count : Effective as many as the set times.
    • End Date: Effective till the specified date.

Holiday Holiday S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 25 27 28 29 30 31 List No. Description Date Cycle Description Cycle No Cycle Every Days Every Weeks Every Months Every Years Range Start Date 2030-12-02 Start Date Times Start Date 2030-12-03 Add Close

To edit a holiday

  1. Select a date in the calendar.
  2. Set the cycle, end date and description, and click [Add]. The created holiday will be added to the list.
  3. Ex) If you select to add every second week for the holiday, your settings will be as shown.

To create a holiday

  1. Select a holiday to edit in the list.
  2. Change the cycle, end date and description to your preference, and click [Update].

Holiday Holiday Start Date: 2010-12-01 Start Date: 2010-12-02 Unrealized Count Times End Date: 2010-12-03 Add Close

To delete a holiday

  1. Select a holiday to delete in the list.
  2. Click [Delete]. The selected holiday will be removed.

Recording Event

For your better understanding of the event situation, you can set the pre and post recording times based on the event occurrence point.

Pre and post images as many as specified based on the event occurrence time will be saved.

  • Motion, Alarm, Intelligent Video Analysis Event: You can set both pre and post times.
    • Video Loss Event: As there will be no image to record after occurrence of the event, the pre time alone can be specified.

NET-1 server Tool Network Backup Default Access Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network System Logeta

  1. Select an item to record. If the time option is activated, you will see a list of sub items available.

SAMSUNG NET-i ware - Recording Event - 2

■ If you set the time option to Off, recording will not proceed.

  1. Select pre and post times to record and specify a recording time for each event.
  2. Click [Apply] in the bottom side to save your settings.

NET 1 were Tool Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Set up Setup Backup Exit Layout

Recording Camera

You can set the fps to save for each activated camera and recording type (normal/event).

  • The normal recording type includes manual recording and continuous scheduled recording.
  • Available event recording types include Motion/Alarm/Video Loss/Intelligent Video Analysis.

You can specify the storage period of a recording file for each active camera.

- An expired recording file will be deleted automatically.

NTJ / ware Tool 12.0000/NTJ 14:16:20 Setup Backup Exit Entry Layout

Video Setup Item Description
MPEG ALL FRAMES Saves all incoming frames.
KEY FRAMES Saves only I-frame.
MJPEG 1 ~ 30 Saves as many fps as you selected.

This will not affect the video setting.

The actual incoming frame rate from the device may differ from the setting here, and you will receive just as many frames as incoming.

■ The maximum throughput of recording is 250 Mbps.
- Recording in 3M of resolution is possible if it's not exceeding the maximum throughput.
- For stable recording, it is recommended to use a HDD that meets the minimum specification of SATA2 7200rpm. (It is also recommended that the maximum throughput of a single HDD does not exceed 125Mbps.)
- You can search for and play the recoding data using NET-i viewer or Web Viewer.

Event Camera

You can set the event discard time for, and the Alarm Into sync with each activated camera.

The event discard time is to discard a duplicate event in the specified time range.

You can also set an Alarm In to sync with each camera, which occurs from the device.

- If you did not set an Alarm In to sync: Any Alarm In from the device will not affect NET-i ware.

- If you set an Alarm In to sync: If an Alarm In occurs from the device according to the recording and event settings, scheduled recording will starts according to the recording and event settings or an e-mail will be sent.

NCT 4.x series Tool File Edit View Insert Format Help 12.03.2014 13:53:58 Setup Backup Exit setup Layout

SAMSUNG NET-i ware - Event Camera - 2

As long as the Alarm In function of the device is not active, the Alarm In event will not occur even if you have set the Alarm In in NET-i ware Tool.

  1. In the camera menu window, click the Event Discard Time item of the connected camera. Time options available will be listed.

  2. Select an event ignorance time.

  3. Click the Alarm item and select an Alarm In to sync.

  4. You can select multiple items.

NET 1.xware Tool CONT 1:000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000 CONT 1:24.94 Backup Exit 11:24:94 1:24.94 Backup Exit 1:24.94 Backup Exit 1:24.94 Backup Exit 1:24.94 Backup Exit 1:24.94 Backup Exit 1:24.94 Backup Exit 1:24.94 Backup Exit 1:24.94 Backup Exit 1:24.94 Backup Exit 1:56.78 Backup Exit 1:56.78 Backup Exit 1:56.78 Backup Exit 1:56.78 Backup Exit 1:56.78 Backup Exit 1:56.78 Backup Exit 1:56.78 Backup Exit 1:56.78 Backup Exit 1:56.78 Backup Entry

Event Messaging

You can set to send an e-mail if an event occurs.

◆ E-mail Object Management

You can create/edit/delete an e-mail. In the left pane of the screen, you will see the e-mail list while you can check the information of the selected e-mail in the right pane.

NET Server Tool Name: Description: Design Setup Type: GO Layout TCP Local Name: Local Address: Local History: Next: 12.55.01 Backup Exit Send LogNet Send Cancel Status Help Help Cancel OK Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Circulink Status Help Help Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Cancel Balance

To create an e-mail

Click [Add] in the bottom list, and provide a name and description and click [Add] in the dialog.

An e-mail of the default settings will be created.

Add E-mail Name Description Add Close

To edit an e-mail

Change the name, description or subject in the E-mail page.

To add a recipient or CC

  1. Click [Add].

Using the user information that is already registered with NET-i ware

  1. Click [Add All] or select a desired user and click [Add Selected]. Or, provide an e-mail address and click [Add].

The e-mail address that you added will be displayed in the bottom list.

When done, click [OK].

  1. Change the mail server settings as necessary, including: sender, receiver, server address, server port, enable authentication, ID, password, and enable SSL.

- Press the [Default] button to set the server port number as default.

Add Members to the Mailing List Select from User Group/User List User Group User Group Name Number of Members User Administrator group 1 Select User Name E-mail As Add All Add Selected Type of E-mail Address Add No User Name User Group Name E-mail Address Delete OK Close

  1. For your preferred transfer settings, select a desired item(s) from Motion, Video Loss, Intelligent Video Analysis and Alarm for each camera.

  2. To save your work, click [Apply].

To delete an e-mail

Select an e-mail in the list and click [Delete].

To transfer an e-mail

When the e-mail transfer conditions are completed, an e-mail will be sent to the recipient(s) with the CC at the moment an event occurs from the camera.

The e-mail message includes the camera name, event type and event occurrence time.

If there is a JPEG image recorded at the event occurrence time, it will also be attached to the e-mail.

This function is to sound the alert upon the occurrence of an event.

◆ To register an alert sound file

You can register an alert sound file to use.

- Only the wav format is supported.

By default, two wav files are provided:

- alarm.wav, notify.wav

  1. Click [Add] in the bottom corner.

  2. Select an alert sound file to use.

The selected file will be registered.

  1. To delete an already registered alert sound file, select a file in the list and click [Delete].

To set an event

You can specify an event for which the alert sound will be output. Event types available are as follows:

- Motion: If a motion event is incoming from the connected device

- Alarm: If an alarm event is incoming from the connected device

• Video Loss: If a video loss event is incoming from the connected device

- Intelligent Video Analysis: If receiving an intelligent video analysis event from the device

• HDD Full: The HDD is full and can not store any more

- HDD Failure: The HDD is out of order and can not store data.

  1. Select an alert sound in the list to output when a device or HDD event occurs.

  2. Click [Play Sound] to listen to the sound in advance.

  3. Click[Apply] to save the changes.

NET 1 server Tool Network Access E-mail About Access New Net Counting Type: Open Name: Video user: Analog device name: USB USB Total USB Name: For the required Get a new Help Net Tool Type 1 Download User Microsoft Teams MSV3.0000 Add Cancel Settings 2024-07-27 PM 11:25:38 Setup Backup Exit Save... Logeta!

NET 1.xware Tool File Edit View Insert Tools Help Net Search Tool: Name: Open Path: View Path: View Path: View Path: View Path: View Path: View Path: View Path: View Path: View Path: View Path: View Path: View Path: View Path: View Path: View Path: View Path: View Path: View Path: View Path: View Path: View Path: View Path: View Path: View Path: View Path: Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show Show

EVENT PRESET

This enables you to move the camera preset at the moment an alarm occurs.

◆ Preset settings

Specify a preset to which the current preset is moved when an alarm occurs.

SAMSUNG NET-i ware - ◆ Preset settings - 1

- This is enabled only when the device supports the alarm event and preset features.

You must specify the alarm that is used in the event camera setup page.

■ Press Refresh to update the current preset list.

NET-2 Manager Tool Settings 2013.12.198 - 106 13:55:37 Setup Backup Exit Layout Help

Schedule Backup

You can backup stored data according to the schedule that you set.

NET-1 team Tool Designator Software Application Settings Name: Size: Size(S): 3.5 Description: * Design Type: Design Type: Design Range: * Design Time: Design Time: 0.25 Design Time: 0.25 Design Time: 0.25 Design Time: 0.25 Design Time: 0.25 Design Time: 0.25 Design Time: 0.25 Design Time: 0.25 Design Time: 0.25 Design Time: 0.25 Design Time: 0.25 Design Time: 0.25 Device Destination: Name: Date: 2014/12 System Name: 01.186.1.29-400-479-13 System Location: Layout OK Cancel Help

◆ Schedule Backup Management

You can create/edit/delete a schedule backup.

In the left pane of the screen, you will see the schedule backup list while you can check the information of the selected schedule in the right pane.

◆ To create a schedule backup

  1. Click [Add] in the bottom list. You will see the Add Schedule Backup dialog.

  2. Provide a name and description in the dialog and click [Add]. A schedule backup of the default settings will be created.

◆ To edit a schedule backup

You can change the schedule backup name and description.

  1. Change the schedule backup cycle and range. Select [Every Day] or [Every Week] for the backup cycle.
  2. Enter the schedule backup start time and range.

  3. Select an item to backup the schedule. You can specify a path for the external usb HDD and Network Drive as it is supported.

SAMSUNG NET-i ware - ◆ To edit a schedule backup - 1

  • You can use only those drives that can be recognized by the operating system.
  • If you select a network drive for the media, enter a valid ID and password for the backup media. If any of them is invalid, the schedule backup may not be performed normally.
    If you cannot find any network drive in the folder browser, restart the NET-i ware Tool program.

  • Select multiple cameras to backup the schedule.

  • Click [Apply] to save the changes.

Add Schedule Backup Name Description Add Close

NET import Tool Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Setup Set 16:30:33 Setup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Backup Binary

◆ To delete a schedule backup

Select a schedule backup in the schedule backup list and click [Delete].

To perform and play the schedule backup

Schedule backup will perform according to the schedule that you set.

  • If you set the schedule backup cycle to Every Day: Recording data one day before within the backup range will be backed up.
  • If you set the schedule backup cycle to Every Week: Recording data one week before within the backup range will be backed up.
  • Path for the schedule backup file: User specified path\NIWData\Camera ID\Recording Date\Sstart-end_ID_0000(1).rec1 The camera ID is created based on the MAC address of the device and other information.
    ■ 4 digits trailing ID is overlapping index, where smallest number is the latest recording.
    ■ Parenthesized number is the distinguisher for same filenames.
  • You can play the schedule backup file using the video playback function of NET-i viewer.

Network drive

If you use the network drive to perform the schedule backup, you can configure the settings for the network connection retry and auto deletion of the backup files.

◆ Network connection retry

If the network is disconnected at the start of the schedule backup, it will try to connect again according to the specified cycle and times.

◆ Auto deletion of backup files

Any backup file earlier than the specified auto deletion date will be deleted at the start of the schedule backup.

NET Server Tool Network Provider 10.1 Network Code: 2 Network Event: 2 AutowhOLE of Backup Box: 25 Backup Backup Backup Backup 16:31:47 Setup Backup Exit Import Export

NETWORK SETTING

You can check and configure the settings for accessing NET-i viewer and web viewer.

Interface

◆ Network Access Count

You can specify the number of networks that you want to access.

  1. Check a network that you want to access.

  2. If accessing a single network: Uncheck the option of "Enable Network 2". If accessing only one network, all communications with NET-i ware and external devices, will be via the selected network.

  3. If accessing two networks: Check "Use network 2." If this is the case, communications with NET i-ware will be via network 1 while communications with external devices will be through network 2, which will distribute the network load (traffic).

  4. Click [Apply] to save the changes.

NET-1 ware Tool Network Network Type: Auto mining Transfer Network: IP socket Network 1 Network Type: Tool Parameters URL Storage System Accession User Count Process Data 102 Options Backup Text LogNet Settings 2014/09/01 13:56:01 Setup Backup Text

To select a network

Select one from network 1 and network 2, which is installed and in service on the PC. For network 1, you can change the bandwidth if you want.

- If the network setting is changed, the NET-i ware service will restart.

◆ Port Setting

  1. Set the port range to use.

For the concurrent user count, you can specify 10 users for TCP/UDP (Unicast), and up to 20 for UDP (Multicast). You can specify the client program and protocol type.

  • TCP
  • UDP (Unicast)
  • UDP (Multicast): Provide the multicast address, port and TTL.

  • Click [Apply] to save the changes.

SAMSUNG NET-i ware - ◆ Port Setting - 1

- To enable a connection method of UDP (Multicast), you must configure the network setting so that it supports multicasting.

- It is recommended to use a switch device supporting Layer 3 or higher.

NET-1 server Top Network Network List Setting Network List Transfer Settings Network 2 Network List File Internet USB Web Background Data Background Data Printed format 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 10 12:56.01 Setup Backup Exit Add to Logret

Network DDNS

Register DDNS with NET-i ware.

■ Provided DDNSs are as follows:

  • websamsung.net
  • dyndns.com (Private DDNS)
  • no-ip.com (Private DDNS)
  • changeip.com (Private DDNS)
  • samsungipolis.com

  • Select a DDNS to use.

■ websamsung.net can be registered without additional settings.
If selecting the private DDNS option, you must provide the product ID, user name and password so that it can be registered.

  1. Click [DDNS Test] to check if it can be registered properly. If registration succeeds, you will see the confirmation window.
  2. You can set the update cycle by the minute and register it with DDNS periodically.
  3. Click [Apply] to save the changes.

NET-1 Wave Tool Network Settings 2016.12.04 MB 13:56.51 Setup Backup Exit Update Connection 7 includes Save Tools Apply Save Layout

NET-i ware Tool DDNS test is completed. OK

SAMSUNG NET-i ware - Network DDNS - 3

- Once you registered DDNS with NET-i ware, you can register NET-i ware using the URL of the DDNS.

System User

You can register users and user groups and set the necessary permissions.

The default user (admin) and user group with the manager permissions are provided.

  • The users (groups) are of parent-child relationship with each other.
  • A user group can own more than one user.
    ■ The user can not own other user or user group.
  • The default password for the default user is 4321. For security purposes, change the password for the default user.

NET export Tool File Search Save Add Import Add Subnet Add Sub Net Add Sub Net Add Sub Net Add Sub Net Add Sub Net Add Sub Net Add Sub Net Add Sub Net Add Sub Net Add Sub Net Add Sub Net Add Sub Net Add Sub Net Add Sub Net Add Sub Net Add Sub Net Add Sub Net Add Sub Net Add Sub Net Add Sub Net Add Sub Net Add Sub Net Add Sub Net Add Sub Net Add Sub Net Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuns Add Sub Nuns Add Sub Nuns Add Sub Nuns Add Sub Nuns Add Sub Nuns Add Sub Nuns Add Sub Nuns Add Sub Nuns Add Sub Nuns Add Sub Nuns Add Sub Nuns Add Sub Nuns Add Sub Nuns Add Sub Nuns Add Sub Nuns Add Sub Nuns Add Sub Nuns Add Sub Nuns Add Sub Nuns Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nits Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nuts Add Sub Nats

◆ User (Group) Management

You can create/edit/delete a user (group).

In the left list of the System User setting window, there displays the user (group) tree; in the right pane, you can check information of the selected user (group).

NET-1 server Tool System Network Network System Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network Network System1 16:35:47 Setup Backup Exit Add User... Add New... Delete... Help... Cancel

To create a user group

  1. Select a user group to use as parent in the tree, and click [Add User Group] in the bottom list.
  2. Provide a name and description in the Add User Group window, and click [Add].

Add User Group Name Description Add Close

To create a user account

  1. Select a user group to use as parent in the tree, and click [Add User] in the bottom list.
  2. Provide a name, description, password, phone number and e-mail address in the Add User window, and click [Add].
  3. The user account will be created under the selected parent.
  4. If you did not select a parent user group, the user account will be created under the default user group.

Add User Name: Description Password Confirm new password Parent Group Administrator group Phone number E-mail Add Close

◆ To edit a user (Group) account

  1. Select a user (group) account to edit in the tree of the System User page.

For the user group, you can change the following settings:

  • Name, Description
  • Permission
    Live (NET-i viewer) : Monitoring, PTZ Control, Covert Monitoring
    ■ Covert Monitoring: You can monitor the camera image of which the Covert function is set to On.

Search (NET-i viewer): Playback, Backup, Covert Playback

■ Covert Playback: You can play the camera image of which the Covert function is set to On.

NET 1 More Tool File Edit View Help Name: 100% View Date: Export: Form Date: Export Group: Export Value: 100% Export Type: Export Date: Export Value: 100% Export Date: Export Value: 100% Export Date: Export Value: 100% Export Date: Export Value: 100% Export Date: Export Value: 100% Export Date: Export Value: 100% Export Date: Export Value: 100% Export Date: Export Value: 100% Export Date: Export Value: 100% Export Date: Auto Start Build Back Stop Save Help TANGSING 2013/08/23 Tns 15:27:23 Setup Backup Exit Auto Legend

NET-i ware Tool Login: Manual backup, hardware, recording, event, backup, network, system

■ Camera access permission : You can set or cancel the access permission to each camera.

SAMSUNG NET-i ware - ◆ To edit a user (Group) account - 2

■ The admin user has the following permissions:

  • Add/delete a user (group)
  • Change monitoring a user (group)
  • Initialize
  • Configure NET-i ware settings
  • Add/Delete Device
  • Change the camera access permission
  • Automatic permission to an additional camera

As a user, you can change the following settings:

  • Name, Description
  • Password
  • Phone Number
  • E-mail Address
  • Parent User Group (You can also use the drag-and-drop method to edit user information in the tree.)
    ■ The default user can not change its parent user group.
  • Permissions can not be changed and will inherit from the parent user group.

  • Click [Apply] to save the changes.

To delete a user (group) account

Select a user (group) account to delete in the tree of the System User page, and click [Delete].

SAMSUNG NET-i ware - To delete a user (group) account - 1

If you delete a user group, its child users (or user groups) will be deleted accordingly.

User Login

If you log in to NET-i ware from NET-i ware Tool or NET-i viewer, the functions will be limited according to the user permission.

You can configure the system settings of NET-i ware.

Language

You can set a preferred language for the program. Select one from Korean, English, Chinese, French, German, Italian, Russian, Spanish, Japanese, Turkish, Czech, Polish, Serbian, Rumanian, Portuguese, Dutch, Croatian, Hungarian, Greek, Taiwanese, Swedish, Danish, Norwegian and Finnish.

  • The default will be the language of the operating system and, if you select a language that is not supported by the OS, English will be selected.
  • Check the followings if the change of the language is not applied:

- If there is a language pack for the selected language, install the language pack first.

- Windows XP/Windows 2003

Select the appropriate language in [Control Panel – Regional and Language Options – Regional Options] and [Control Panel – Regional and Language Options – Advanced].

- Windows Vista

Select the appropriate language in [Control Panel – Regional and Language Options – Form] and [Control Panel – Regional and Language Options – Keyboard and Language – Normal].

RCT-1 more Tool Language Type 2 Data Flow Status Data Format: 0.0000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000 Windows Logon Mounts User 35: 28x12.26ms Password: 149999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999 Save As Integer for the Transporter Select from the local system to a specific key in any other Close us of the following items: □ Delete any between the Transporter this program or use other categories. □ Remove data from the Transporter this program or use other categories. ■ Buy □ Sell Description: □ Update □ Settings □ Back □ Back/Back Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse... Browse...

◆ Windows Logon Account Setting

You must create a Windows logon account before you can back up schedules using a network drive.

- The Windows logon account is information required to log onto the Windows OS of your PC. You can check your Windows logon account in Control Panel – Administrative Tools – Computer Management – Local Users and Groups.

- Once a valid Windows logon account is created, you may need to restart the system.

◆ Overwrite Options

If you change the PC time behind the current time, you can select to delete data recorded later than the changed time.

If you do not delete the data, the data may be redundant in the overlapped time range.

If changed your computer's standard time (GMT/DST), you need to restart your computer for proper NET-i ware operation.

IP filtering

Specify the use of the IP filtering option.

You can also add or delete an allowable IP.

If you use the IP filtering function, you can log in to NET-i ware from NET-i viewer using only an allowable IP.

  1. If you want to use the IP filtering, check the applicable option item.
  2. Click [Add].
  3. Enter an IP address and click [Add].
  4. Click [Apply] to save your settings.

Add IP Filter IP Address Add Close

◆ Initialization

This will restore the NET-i ware settings to the default.

Select a desired item to reset.

Items that can be reset are as below:

  • All: Resets all settings.
  • Hardware: Resets the hardware settings.
  • Recording: Resets the record settings.
  • Event: Resets the event settings.
  • Backup: Resets the backup settings.
  • Network: Resets the network settings.
  • System: Resets the system settings.
    For the language, it will be reset to the language set by the OS.

  • Select an item to reset.

  • Click [Initialization] in the right corner. If you reset an item, the NET-i ware service will restart and display the Reconnect dialog.

NET-1 ware Tool Language Type Data Flow Link Data Portion: 01748962 Name: 0 Password Status Size: 30.0000 Password: 0.0000 Backup Save As Integer Save As Integer Save As Integer Save As Integer Save As Integer Save As Integer Save As Integer Save As Integer Save As Integer Save As Integer Save As Integer Save As Integer Save As Integer Save As Integer Save As Integer Save As Integer Save As Integer Save As Integer Save As Integer Save As Integer Save As Integer Save As Integer Save As Integer Save As Integer Save As Integer Save As Number Save As Number Save As Number Save As Number Save As Number Save As Number Save As Number Save As Number Save As Number Save As Number Save As Number Save As Number Save As Number Save As Number Save As Number Save As Number Save As Number Save As Number Save As Number Save As Number Save As Number Save As Number Save As Number Save As Number Save As Number Save As Value Save As Value Save As Value Save As Value Save As Value Save As Value Save As Value Save As Value Save As Value Save As Value Save As Value Save As Value Save As Value Save As Value Save As Value Save As Value Save As Value Save As Value Save As Value Save As Value Save As Value Save As Value Save As Value Save As Value Save As Value Save As Values: Save As Values: Save As Values: Save As Values: Save As Values: Save As Values: Save As Values: Save As Values: Save As Values: Save As Values: Save As Values: Save As Values: Save As Values: Save As Values: Save As Values: Save As Values: Save As Values: Save As Values: Save As Values: Save As Values: Save As Values: Save As Values: Save As Values: Save As Values: Save As Values: Save As Values:

Reconnecting... Service is restarting. It may take seconds to minutes or longer depending on the environment.

Version

Displays the version of NET-i ware.

NET-i ware Updater

Performs the NET-i ware Updater manually.

Setting Updater

You can set the auto update.

Update

You can perform the update manually.

NET-1 software Tool Settings Options Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Instructions Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Settings Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: Questions: 0.0000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000

NTP Server

You can check the service status and address of the NTP server. You can start or stop operating the NTP server service.

NTP Client

Specify the NTP server for time synchronization.

You can change the PC time manually.

You can specify the frequency that the time synchronization is performed on a regular basis.

◆ System restart setting

You can specify the activation frequency and time to restart the vsystem (PC).

System restart setting Use 7 Days Time Setting 09:00 Apply Close

◆ Import/Export NET-i ware Configuration

You can extract the NET-i ware settings and apply them to the NET-i ware that is installed on other PC. Recording data can not be imported / exported.

Export NET-i ware Configuration

  1. Click [NET-i ware Config] in the bottom. You will see the Import/Export NET-i ware Configuration dialog.
  2. Select Export and specify a file path.
  3. Click [Export]. All settings are created as a file.

Import/Export NET-1 ware configuration Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export Export 0%

Import NET-i ware Configuration

  1. Click [NET-i ware Config] in the bottom. You will see the Import/Export NET-i ware Configuration dialog.
  2. Select an item to import and click Import. The Import button will be activated.
  3. Select a file path and click [Import].

Import/Export NET-1 ware configuration All Hardware Backup Recording Network Event System Export Export 0% Import Close

System Log

You can set to save the log and search for a stored log.

Log Setting

Only logs in the set period will be saved, and those that expire will be deleted automatically.

Set the type of the log to save.

  • Log types available are as follows:
  • System: Start/Stop service, HDD Full and Write Error, Time Change, Initialization
  • User: User Login/Logout
  • Backup: Start/Stop Backup and Backup Failure
  • Recording: Start/Stop Recording/Recording Failed
  • Motion: Motion detection event of the device
  • Alarm: Alarm event of the device
  • Video Loss: Video loss event of the device
  • Intelligent Video Analysis: An intelligent video analysis event of the device

  • Provide a log storage period.

- Storage Period: 1\~365 days

  1. Check to select a log type.

  2. Click [Apply] to save your settings.

NET 1 software Tool Setting Accession: 100 IP System: IP User IP Number: IP Share IP Method: IP Access IP Vulnerance: IP Accepting IP Subcode: IP Intrap/Video Interface Sub-Test Data Description Start Test: 250x (250) F1.5x (250) End Test: 250x (250) F2.5x (250) Type File Input: 100x (100x) Output: 100x (100x) Backup: Backup Exit Name: Layout

SAMSUNG NET-i ware - Log Setting - 2

- Up to 20,000 logs can be saved, and if the log count exceeds the maximum, the logs will be backed up as a file with the oldest first. You can check the backup logs in the following path: "Log" folder under the installation folder of NET-i ware. ex) C:\Program Files\Samsung\NET-i ware\log

To search for a log

You can set the log search criteria for your search.

  1. Provide the date/time settings for the log search range. Provide the search range including the time unit of second.
  2. Check to select a search type.
  3. Click [Search]. Logs meeting the search criteria will be listed.
  4. You can set the log count per page in [View Count]. You can scroll through the pages to move to the previous or next page in a long list.
  5. Click [Save As] to export the logs in the current page.
  6. Click [Delete Search Results] to delete searched logs. Deleted logs are not searched.

NET-1 User Tool Network Settings Setup File Size: 50 File Type: All File Name: All File Date: 2016-04-03 File Status: All File Type: All File Name: All File Type: All File Name: All File Type: All File Name: All File Type: All File Name: All File Type: All File Name: All File Type: All File Name: All File Type: All File Name: All File Type: All File Name: All File Type: All File Name: All File Type: All File Name: All File Type: All File NAME: All File Type: All File Name: All File Type: All File NAME: All File Type: All File Name: All File Type: All File NAME: All File Type: All File NAME: All File Type: All File NAME: All File Type: All File NAME: All File Type: All File NAME: All File Type: All File NAME: All File Type: All File NAME: All File Type: All File NAME: All File Type: All File NAME: All File Type: All File NAME: All File Type: All File Name: All File Type: All File NAME: All File Type: All File NAME: All File Type: All File NAME: All File Type: All File NAME: All File Type: All File NAME: All File Type: All File NAME: All File Type: All File NAME: All File Type: All File Name: All File Type: All File NAME: All File Type: All File NTNT-10000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000

TO BACKUP DATA

You can search for and backup desired data manually.

  1. Click [Backup] in the right corner of the main page.
  2. Select a backup file format, time, storage device and backup data and click [Start Backup] to backup the selected data.

NET / menu Tool File Name: 01 (01) 01 Storage Data Type: 01 (01) 02 (01) Data Time: 01 (01) 03 (01) Data Location: Name: 01@net.01@net Sub Source: 10.458.4.25 @E-03 (7/4) 20.458.4.25 @E-03 (7/4) 30.458.4.25 @E-03 (7/4) End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub End Sub Start Menu Start Menu End Sub

Backup File Format

Select a backup file format from REC1 and SEC.

- REC1 : File format that can be played using the video playback function in the Search Viewer of NET-i viewer.

- SEC : File format that can be played without an additional viewer.

- The minimum requirements for normal operation of SEC Backup Viewer are as follows: CPU Quad Core 2.5GHz or higher, DRAM 3GB or more.

Backup Criteria

Select a backup time, storage device and camera to backup.

- Time Range: Set the time range for the recording data to backup.

- Backup Destination: Select one from the External USB HDD, DVD/CD, USB Flash Memory and specify the sub path.

- You can reuse a DVD-RW disk using the "Erase this CD-RW" menu in the Windows Explorer.

■ The DVD+RW disk can not be reused.

- Camera: Select multiple cameras to backup.

NET 1ware Tool File Path 0000 TWO Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path Data Path

SAMSUNG NET-i ware - Backup Criteria - 2

  • You can use only those drives that can be recognized by the operating system.
  • For the Windows 7 user, select "CD/DVD Drive" in the Backup Destination pane to display the disk burning popup. If you select "Disk Setup Option" from the disc burning popup, CD/DVD backup will not operate properly. From the disk burning popup, press the "Cancel" button.

To calculate the size of backup data

You can check the original size of backup data that you selected in the above step.

Select data to backup and click [Calculate] in the bottom right corner.

SAMSUNG NET-i ware - To calculate the size of backup data - 1

The actual size of the backup data will be slightly larger than the original as additional information is included.
If there are multiple recording sections in the backup time period, select one of them to estimate backup data size.

Backup Progress

  1. Select a file to backup.
  2. Click [Start Backup].

Backup will start, and you will see the Backup Progress window.

  1. If you want to cancel the backup, click [Cancel] in the Backup Progress window.

In the Backup Progress window, you can also check the following information:

  • Média
  • Backup Size
  • Free space
  • Current Task
  • Result
  • Backup progress

If there are multiple recording sections in the backup time period, select one of them to backup.

SAMSUNG NET-i ware - Backup Progress - 1

bar | Metric | Value | | -------------------- | --------- | | Media | USB Flash Memory | | Backup Size | 1.0 MB | | Free space | 1.1 GB / 1.9 GB | | Current Task | File conversion (REC1 Format) | | Result | File conversion (REC1 Format) | | 50 % | 50% |

Backup Progress Media USB Flash Memory Backup Size 49.0 MB Free space 1.1 GB / 1.9 GB Current Task Copying files Result Copying files 0 % Cancel

Service Manager

When the program is installed on the PC, the Service Manager icon will be displayed in the right tray on desktop.

USING SERVICE MANAGER

The Manager will reside in the Windows tray that manages the NET-i ware service.

Select the icon and right-click it.

The Service menu will appear.

Start the NET-i ware service Stop the NET-i ware service View the service properties View the NET-i ware Tool Start the NET-i ware Update Manager Exit

Service Management

You can start or stop the service.

  • Start the NET-i ware service: Starts the NET-i ware service.
  • Stop the NET-i ware service: Exits the NET-i ware service.

◆ NET-i ware Tool Program

You can run the NET-i ware Tool program.

◆ Viewing Service Information

Click [View the Service Properties] to display the NET-i ware Service Information window.

  • Start Service Tab: You can check the status of the service.
  • Setup Tab: You can set to automatically run the NET-i ware service when the system starts.
  • Product Key Tab: Shows the installed product's product key.
  • S/W Version Tab: You can check the current version of the software installed on the PC.

NET-i ware service properties SAMSUNG Start service Setup Product Key S/W version Status of watchdog service : Started Status of master service : Started Stauts of storage service : Started Status of Licensing : Activated Start the NET-i ware service Stop the NET-i ware service Apply Close

INSTALLATION

The updater file will be installed together when you run the installer file of NET-i ware.

Run

Click Execute Updater in the System Setup page of the NET-i ware Tool, or click Start Updater in the Service Manager to launch the NET-i ware Updater.

If the program starts normally, you will see the tray icon of the "NET-i ware Updater Manager" program in the task bar.

  1. Place the cursor over the icon. You will see a tool tip as shown.

NET-i ware Updater Manager A 溪 ? < > 滤 滤 滤 滤 滤 滤 滤 滤 滤 滤 滤 滤 滤 滤 滤 滤 滤 滤 滤 滤 滤 滤 滤 滤 滤 满

  1. Right-click the tray icon. You will see a context menu as show.

Show Setup Exit

◆ To update with the latest version

You can connect to the server and update the program with the latest version, regardless of the autocheck function.

  1. Right-click the [NET-i ware Updater Manager] tray icon.
  2. In the context menu that pops up, select the [Show] item. You will see the NET-i ware Updater Manager window.
  3. In the "NET-i ware Updater Manager" window, click [Check New Version].

① In this window, you can check the current version and installation date.
② Select the [ ] button to check the release note of the current version.
③ You can check the communication log. You can use the log to check the cause of failure.
④ If you select the [Check New Version] button, you can check if a later version than the current is released on the server.
⑤ Click [Log Clear] to delete a log or logs.
⑥ Click [Hide] to disappear the menu window.

NET-i ware Update Manager NET-i ware Updater Manager SAMSUNG NET-i ware v0.501.098709 Last Update Date 2009-07-09 11:19:56 Server [10.240.53.37] Connect Checking ... Start NET-i ware Update... [2009-07-09 11:20:03] .... Checking whether NET-i ware update is locked. If it's locked, up .... Receiving NET-i ware Update information .... Analyzing update data file .... You already have the latest version. .... NET-i ware Update completed Check New Version Log Clear Hide

You can set the check update cycle to check any update automatically.

  1. Click the [NET-i ware Updater Manager] tray icon.
  2. In the context menu that pops up, select the [Setup] item.
  3. Change the settings in the Setup window, and click [Save].

Using AutoCheck

You can set to check any update every day.

  1. Click Daily.
  2. Select a time to perform the auto check. Ex) The right figure shows the auto check performs 08:00:00 AM every morning.

NET-I ware Updater Manager Setup AutoCheck Setting Use AutoCheck Define Check Interval Daily Weekly Monthly Update Check Interval Day Time 06:00:00 Save Cancel

You can set to check any update every week.

  1. Click Weekly.
  2. Select a day of the week to perform the auto check.
  3. Select a time to perform the auto check. Ex) The right figure shows the auto check performs 08:00:00 AM every Sunday morning.

NET-1 ware Updater Manager Setup AutoCheck Setting Use AutoCheck Define Check Interval Daily Weekly Monthly Update Check Interval Day Sunday Time 08:00:00 Save Cancel

You can set to check any update every month.

  1. Click Monthly.
  2. Select a date to perform the auto check.
  3. Select a time to perform the auto check. Ex) The right figure shows the auto check performs 17:02:24 PM every first day of the month.

NET-I ware Updater Manager Setup AutoCheck Setting Use AutoCheck Define Check Interval Daily Weekly Monthly Update Check Interval Day 1 Time 17:02:24 Save Cancel

AUTO UPDATE SCENARIO

Notice of the Latest Version

If there exists the latest version on the server, you will see a message as shown.

You can check the release note, and select to proceed with or cancel the update.

Confirm The new version of NET-i ware is found, Do you want to update to version [v1,10_091026]? Update Cancel NET-i ware update Check Release Note first.

Download

Click [Update] to download the installation files.

Download Program Name NET-4 were Pro Version v1.10.09102 -> v1.10.091036 File Name SNS-SF064.v1.10.09102.exe File Size 371,275 KB Size of data 22,775 KB Time Elapsed 00:00:04 Remaining Time 00:01:15 Transfer Rate 4.563 KB/s Check Release Note first. 6 %

Checking Installation

When the download process is completed, you are prompted to install the update files now.

If you select [No], you will see the "NET-i ware Install" popup as shown where you can choose to install next time the program starts; this message will appear only if there is the latest version downloaded on the PC.

If you select [No] in the "NET-i ware Install" window and run the program, [NET-i ware Updater Manager] will check for any new version in the server and, if any, discard the existing update and try to download the newer version.

NET-I ware Install Install Now? Selecting will exit all NET-I were applications and start updates. Selecting delays updating to the next startup. Yes No.

Installation

If you select [Yes], all NET-i ware applications will exit and the Manager will proceed with the installation.

NET-i Web Viewer

what is the weB viewer?

It is a remote viewer that allows you to remotely connect to NET-i ware and to perform the real-time monitoring, PTZ (if specified) control, and search.

SAMSUNG NET-i ware - what is the weB viewer? - 1

flowchart
graph LR
    A["Network Camera"] --> B["Computer"]
    B --> C["NETWORK"]
    C --> D["Computer"]
    style A fill:#f9f,stroke:#333
    style B fill:#ccf,stroke:#333
    style C fill:#cfc,stroke:#333
    style D fill:#fcc,stroke:#333

SAMSUNG NET-i ware - what is the weB viewer? - 2

■ NET-i ware web viewer supports most major web browsers.

  • Internet Explorer, Safari, Chrome, Firefox
  • Using the Chrome browser on MAC OS X 10.7 Lion is not supported.

getting started with the weB viewer

  1. Open the web browser and enter the IP address of the PC that is running NET-i ware in the address bar.

SAMSUNG NET-i ware - getting started with the weB viewer - 1

- If Silverlight is not installed or a lower version of Silverlight is installed, you must install Silverlight or upgrade the current version before proceeding. (Page 46)

Web Viewer for samsung NVR - Microsoft Internet File Edit View Favorites Tools Help Back Search Address http://127.0.0.1/

  1. Provide the user ID and password.

  2. Default ID: admin

  3. Password: 4321

Login ID admin Password •••• OK

  1. Click [ok].

You will see the main screen of the live viewer.

IPOLIS IPOLIS IPOLIS IPOLIS IPOLIS IPOLIS IPOLIS IPOLIS IPOLIS IPOLIS IPOLIS IPOLIS IPOLIS IPOLIS IPOLIS IPOLIS IPOLIS IPOLIS IPOLIS IPOLIS IPOLIS IPOLIS IPOLIS IPOLIS IPOLIS IPOLIS

INSTALLING SILVERLIGHT

If your PC has not installed Silverlight or has just installed an older version, you will be redirected to the Silverlight installation page automatically when accessing the web viewer.

  1. Click .

Microsoft To view this content, please install Microsoft® Silverlight® Click now to install QUICK DOWNLOAD / 30 SECOND INSTALL

  1. When the file download dialog pops up, click .

File Download - Security Warning Do you want to run or save this file? Name: Silverlight.exe Type: Application, 5.98MB From: 127.0.0.1 Run Save Cancel While files from the Internet can be useful, this file type can potentially harm your computer. If you do not trust the source, do not run or save this software. What's the risk?

  1. When the download is completed, click .

Internet Explorer - Security Warning Do you want to run this software? Name: Microsoft Silverlight Installer Publisher: Microsoft Corporation More options Run Don't Run While files from the Internet can be useful, this file type can potentially harm your computer. Only run software from publishers you trust. What's the risk?

  1. The Silverlight installation page will be displayed. Click to proceed with the installation.

Install Silverlight By clicking Install now you accept the Silverlight license agreement. View the Silverlight License Agreement Silverlight updates automatically. View the Silverlight Privacy Statement Microsoft Silverlight Install now

  1. When done, click .

  2. Close and restart the web browser, and try to access the Web Viewer. When Silverlight is installed properly, you will see the live screen displayed.

SAMSUNG NET-i ware - INSTALLING SILVERLIGHT - 5

- For a proper installation, set the Block Popup setting as follows: Ex) Internet Explorer→Tools → Block Popup → Turn off Pop-up Blocker (B)

Installation successful You may have to refresh (FS) the Web page for these changes to take effect. Close

46_ English

If you fails to connect to the web viewer, check the followings:

  1. Ensure that the system port is set to between 4505 and 4534. You can check and change the port number in - - of NET-i ware.
  2. Ensure that the HTTP port specified in NET-i ware is not used simultaneously in any other program. You can change the settings in - - of NET-i ware.

SAMSUNG NET-i ware - INSTALLING SILVERLIGHT - 7

If the port number is other than 80, you should add the port number next to the IP address in the address bar of the web viewer.
If the web viewer is disconnected due to a changed system port, reload the web browser and log in again.

  1. To check if the web server of NET-i ware operates properly, launch the Monitor Apache Server.

Run the program by clicking the tray icon or by selecting the program menu to check if "NET-i_ware_webserver" is currently running.

NET 1 software Tool Network Sub-Net Sub-Net Settings Sub-Net Transfer Modulable Sub-Net 2 Sub-Net Link Sub-Net 1 Sub-Net Link Sub-Net Link Sub-Net Link Sub-Net Link Sub-Net Link Sub-Net Link Sub-Net Link Sub-Net Link Sub-Net Link Sub-Net Link Sub-Net Link Sub-Net Link Sub-Net Link Sub-Net Link Sub-Net Link Sub-Net Link Sub-Net Link Sub-Net Link Sub-Net Link Sub-Net Link Sub-Net LTR (1) Sub-Net LTR (2) Sub-Net LTR (3) Sub-Net LTR (4) Sub-Net LTR (5) Sub-Net LTR (6) Sub-Net LTR (7) Sub-Net LTR (8) Sub-Net LTR (9) Sub-Net LTR (10) Sub-Net LTR (11) Sub-Net LTR (12) Sub-Net LTR (13) Sub-Net LTR (14) Sub-Net LTR (15) Sub-Net LTR (16) Sub-Net LTR (17) Sub-Net LTR (18) Sub-Net LTR (19) Sub-Net LTR (20) Sub-Net LTR (21) Sub-Net LTR (22) Sub-Net LTR (23) Sub-Net LTR (24) Sub-Net LTR (25) Sub-Net LTR (26) Sub-Net LTR (27) Sub-Net LTR (28) Sub-Net LTR (29) Sub-Net LTR (30) Sub-Net LTR (31) Sub-Net LTR (32) Sub-Net LTR (33) Sub-Net LTR (34) Sub-Net LTR (35) Sub-Net LTR (36) Sub-Net LTR (37) Sub-Net LTR (38) Sub-Net LTR (39) Sub-Net LTR (40) Sub-Net LTR (41) Sub-Net LTR (42) Sub-Net LTR (43) Sub-Net LTR (44) Sub-Net LTR (45) Sub-Net LTR (46) Sub-Net LTR (47) Sub-Net LTR (48) Sub-Net LTR (49) Sub-Net LTR (50)

Running 1 of 2 Apache services 20:51

If it's not running (green icon), move to the Apache services item and click of "NET-i_ware-webserver".

To ensure a proper operation of the service, you should not use the same port as mentioned in step 2 above.

Apache2.2 NET-i_ware_webserver Start Stop Restart

  1. For Windows Server 2003/2008, the Web Viewer may have a problem making connection due to the enhanced security of the Internet Explorer. If you encounter blocked contents of the web page that you accessed with the Web Viewer, check the followings.

- For Windows Server 2003

Move to [Control Panel – Add/Remove Programs – Add/Remove Windows Components], and uncheck [Internet Explorer Enhanced Security Configuration].

- For Windows Server 2008

Move to [Control Panel – Management Tools – Server Manager – Server summary – Security Information – IE ESC Configuration] and change the [Internet Explorer Enhanced Security Configuration] to [Do not Use].

NET-i Web Viewer

  1. Only one user can access the web viewer setup page or NET-i ware tool at a time.

If a different user has already accessed the setup page, you will be prompted to access the page by force.

  • If selecting , you cannot access the page.
  • If selecting will disconnect the access by the current user and enable you to access the page.

If this is the case, the current user cannot configure any setting in the Setup page and will be notified of the forcible access by a different user.

NET-i ware It is already being used by other user. Do you still want to proceed? Yes No

NET-i ware Other user has obtained the setup permission by force. OK

Live Viewer At a Glance

SAMSUNG iPOLiS 1 2 3 4 5 6 7 8 [01]192.166.0.180:4520-1CH-01 PC Time NVR Time SEQ PREV NEXT CAPTURE PRINT RECORD [01]192.166.0.180:4520-1CH-01(1) 2012-01-01 14:30:21 SAMSUNG SAMSUNG SAMSUNG

Item Description
1Split ModeSwitch to a split mode or full screen.
2Time Display OptionsBased on OSD time information of Live Viewer, select one from(on which Web Viewer is running) and(on which NET-i ware is running).
3Channel SelectionSwitch to Auto Sequence mode, or to the previous or next channel.
4Auto Sequence StatusDisplay the sequence status of the channel being displayed.
5Perform the screen capture, printing or recording as necessary.
6AudioAdjust the audio volume.
7Camera NameDisplay the name of the connected camera.
8PTZControl the Pan/Tilt/Zoom operation and adjust the iris or focus as necessary.
9Video ScreenDisplay the channel screen connected to NET-i ware.
10Event Display OffTurn off the display of an event, if occurred, appearing in the top right corner.

SAMSUNG NET-i ware - Live Viewer At a Glance - 2

  • The IP address and the model name of NET-I ware currently connected will be displayed on the top right corner of the Live viewer.
    If selecting any of , , , and on the top right web viewer, you will move to each corresponding menu screen.

Changing the split mode

Click the Split Mode button to switch to the selected split mode.

To switch to Single mode

Click <>.

The video screen will switch to single mode for the selected camera.

- You can double-click the tile of a desired camera to switch to Single mode.

SAMSUNG NET-i ware - To switch to Single mode - 1

natural_image Interior view of a staircase with metal railings and stairs, displayed within an image editing software interface (no readable text or symbols on the staircase itself)

To switch to 4-split mode

Click < >>

The video screen will switch to 4-split mode with the channel of the selected camera moving up to the first tile.

iPOLiS 10K Trim 2.4k Trim Capture Print Print iPOLiS - 5.000000000000000000000000000000000000000000000000000000000000000000000000000 iPOLiS-5.0000000000000000 iPOLiS-5.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1 iPOLiS-5.1.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2.2 iPOLiS-5.1.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3.3 iPOLiS-5.1.4.4.4.4.4.4.4.4.4.4.4.4.4.4.4.4.4.4 iPOLiS-5.1.5 iPOLiS-5 iPOLiS-5 iPOLiS-5 iPOLiS-5 iPOLiS-5 iPOLiS-5 iPOLiS-5 iPOLiS-5 iPOLiS-5 iPOLiS-5 iPOLiS-5 iPOLiS-5 iPOLiS-5 iPOLiS-5 iPOLiS-5

To switch to 9-split mode

Click < ≥slant

The video screen will switch to 9-split mode with the channel of the selected camera moving up to the first tile.

SPOLIS SPOLIS SPOLIS SPOLIS SPOLIS SPOLIS SPOLIS SPOLIS SPOLIS SPOLIS SPOLIS SPOLIS SPOLIS SPOLIS SPOLIS SPOLIS SPOLIS SPOLIS SPOLIS SPOLIS SPOLIS SPOLIS SPOLIS SPOLIS SPOLIS SPOLIS

To switch to full screen

Click < >

Switch the current split mode to full screen.

To exit the full screen, press [ESC] on your keyboard.

Grid of 3x3 grid with blue oval shapes and a small inset image showing a room with furniture.

Using the Live menus

You can perform Auto Sequence, or move to the previous or next channel.

To perform Auto Sequence

Click < >SEQ

This will switch the screen of the connected camera in sequence.

- The number of cameras should be greater than the channel number of the split screen where you want to perform auto sequence.

SEQ PREV NEXT

- You can specify the sequence interval in - - . (Page 68)

To move to the previous/next channel

Click < >OR < >. NEXT

Move to the previous or next channel of the connected device in the current split mode.

Screen capture

  1. Click < ➕PTURE

You will see the window where you can specify the saving path of the captured image.

CAPTURE PRINT RECORD

  1. Specify the path and provide the file name. Then, click

This will save the video of the selected camera as .bmp or .jpg format.

Printout

Click < >PRINT

This will print out the video image of the selected camera using the printer connected to the PC that runs the web viewer.

Record

  1. Click < > RECORD

You will see the window where you can specify the saving path of your recording.

  1. Specify the path and provide the file name. Then, click

This will save the video of the selected camera as .avi format.

- The max recording time is 10 minutes. The recorded video can be played only with DivX codec.

- For playing an .AVI video clip, you can use the free video player to play the video. (ex:GOM Player, KM Player, etc) However, the video may not be played properly, depending on the CODEC compliance of the player.

SAMSUNG NET-i ware - Record - 1

- If the web viewer is in recording mode, the split-screen selection button and other buttons such as , , and will be disabled.

1 4 9 PC Time NVR Time SEQ PREV NEXT CAPTURE PRINT RECORD

To adjust the volume

Select a camera and hold the volume bar while dragging it to a desired point.

Click < 🔵 > to mute the sound.

Click < 🔍 > to release the mute.

SAMSUNG NET-i ware - To adjust the volume - 1

natural_image User interface slider with speaker icon and circular button (no text or symbols)

PTZ control

If the selected camera supports the PTZ operation, the buttons available will be active and you can press an active button to activate a desired operation.

Using the PTZ buttons

1 ZOOM IRIS FOCUS SET ESC 2 3 4 5 6 7 8 9 10 11

Item Description
1DirectionAdjust the camera orientation.
2ZOOMAdjust the zoom factor of the camera.
3IRISAdjust the iris of the camera.
4FOCUSAdjust the focus of the video from the camera.
5SET, ESCChange the selection in the menu screen and confirm or cancel your selection.
6MenuOpen the camera menus.
7PresetOnce you have specified preset positions of the camera, you can select a desired preset to move to the preset position.
8Swing / AutopanMake the camera travel between specified start and end points.
9TourMake the camera follow the specified route combining multiple groups.
10Trace / PatternMake the camera follow the specified route.
11Group / ScanMake the camera follow the selected route in combination of Preset, Pattern and Autopan.

To define a preset

  1. Click <

  2. Click < 1 > to select a preset number.

  3. Provide the preset name.

  4. Use the direction buttons to adjust the camera angle to a desired direction.

  5. Click < SAVE >.

SAMSUNG NET-i ware - To define a preset - 1

- The camera supports adding and displaying up to 20 presets regardless of the preset number. However, both SSNP-series camera and SPE-100/400/1600 supports adding and displaying up to preset #127.

PRESET NO NAME 1 PRESET1 2 PRESET2 EXECUTE DELETE DELETEALL 1 PRESET1 SAVE

To perform the preset

  1. From the preset list, select a registered preset.

  2. Click < EXECUTE >.

The camera lens will move to a specified position.

Swing/Autopan, Trace/Pattern, Group/Scan, Tour

  1. Click the button corresponding to a desired PTZ operation. The selected operation will be performed.

  2. To stop the operation, click the button again.

  3. To change the route or settings, make your change in the camera's Setup menu.

- You can also open the camera Setup page from - of the NET-i web viewer.

To perform the AreaZoom

  1. Move the cursor to a desired camera tile and right-click it.

  2. From the context menu that appears, select . You will see a yellow spot on the screen.

[01]192.168.0.76:4520-1CH-01 Camera Delete ✓ AreaZoom Goto1x 2011-01-28 19:05:20

  1. Drag the yellow spot and drop it at a desired position. Only as much area as the selected box will be zoomed.

■ The camera will perform the pan or tilt so that the box will be positioned center.
- The zoom will be performed only to the max zoom factor supported by the camera.

SAMSUNG NET-i ware - To perform the AreaZoom - 2

natural_image Interior staircase with metal railings and a highlighted rectangular area, no visible text or symbols on the structure itself.
  1. To restore the previous size, right-click the screen and select in the context menu.

T01 T92.168.0.76:4520-1CH-01 Camera Delete ✓ AreaZoom Goto1x 2011-01-23 19:08:23

video sGreen at a glanCe

[08]192.163:0.75:4520-1CH-01 REC 2 2012-01-01 20:37:56 4 5 6 3

Item Description
1Camera NameDisplay the camera name specified in NET-i ware.
2RecordDisplay the status of recording made on the PC that is running the web viewer.
3Intelligent Video AnalysisIf Intelligent Video Analysis is activated, the button will be displayed in a different color.Click the active button again to release the display of intelligent video analysis.
4MotionIf a motion is detected by the camera, the button will be displayed in a different color.Click the active button to release the display of the motion.
5AlarmIf an event occurs in the camera, the button will be displayed in a different color.Click the active button to release the display of the event.
6Time & DateDisplay the time information of the video.

To perform the tile context menu

Move the cursor to a desired context menu of camera tile and right-click it.

You will see the available context menu items of the tile.

  • Camera Delete: Remove the camera from the selected tile.
  • AreaZoom : Perform the AreaZoom.

- For more information, refer to "To perform the AreaZoom". (Page 54)

- Goto1x : Return to the previous screen before the AreaZoom is performed.

[01]192.168.0.76-4520-1CH-01 Camera Delete ✓ AreaZoom Gotoix 2011-01-23 19:05:20

To move the video screen

  1. Select a desired one from the tiles displaying videos.
  2. Drag and drop it to a desired tile position.

The other tiles will move up by one cell.

Ex: if you move the second tile to the fifth, the third tile will move up to the second cell.

Grid of Samsung brand logos displayed in a 3x4 grid, each containing a photo of a building interior with visible signage.

Image grid showing Samsung brand logos in a 3x4 layout with room photos and UI buttons

SEARCH VIEWER

You can search for and play recording data in the PC that is running NET-i ware.

Search Viewer At a Glance

SAMSUNG iPOLiS 1 2 3 Select All [01]192.168.0.180:4520-1CH-01 [SAMSUNG] 2012-01 01 14:39:55 [SAMSUNG] January, 2012 Su Mo Tu We Th Fr Sa 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 Today Search No ObjectName StartTime EndTime Preview 1 192.168.0.180:4520-1CH-1 2011-08-05 14:39:32 2011-08-05 15:15:49 Overlapped Data 9 8 7 6

Item Description
1Split ModeSelect a split mode or full screen.▪ For more information, refer to “Changing the spit mode”. (Page 50)
2Perform the screen capture, printing or recording as necessary.▪ For more information, refer to “Using the Live menus”. (Page 51)
3AudioYou can adjust the volume of the audio data of your search, if any.
4Camera ListDisplay a list of connected cameras where you can select one to search.
5CalendarSpecify a date to search or display the search result.
6Result PaneDisplay the search result.
7Overlapped DataIt shows whether overlapping recordings exist for the same time line. If exist, user can select one to play.
8Timeline / Play BarYou can play the recording data, zoom in/out the video screen, and fix /release the timeline bar. Adjust the play speed of the current video.▪ For more information, refer to “Play”. (Page 60)
9Play ScreenIf you select a search result, it will be displayed in the video screen.

SAMSUNG NET-i ware - Search Viewer At a Glance - 2

- The IP address and the model name of NET-i ware currently connected will be displayed on the top left corner of the search viewer.

  1. From the camera display pane, check the checkbox of the camera to search.
    To select all cameras, check the

Select All [01]192.168.0.76:4520-1CH-01 [02]192.168.0.75:4520-1CH-01 [03]192.168.0.200:4520-1CH-01

  1. Select a month to search in the calendar. Click to move to the current month.

  2. Click .

January, 2012 Su Mo Tu We Th Fr Sa 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 Today Search

Play

1. Click the date containing a search result.

The details will be displayed in the result pane.

  • Preview : The recording type for the section containing search results will be displayed in a different color.
  • Yellowish Green: Continuous
  • Blue: Motion
  • Orange: Alarm
  • Pink: Video Loss
    • Purple: Intelligent Video Analysis
  • Black: Manual

No ObjectName Start Time End Time Preview 1 192.148.0.7x-4525 1CH 01 2011-01-28 19:29:30 2011-01-28 23:52:21

  1. In the result pane, double-click a desired data item or drag and drop it over to a tile.

The selected item will be displayed.

To adjust the currently playing data

14:39:55 0:00 3:00 6:00 9:00 12:00 15:00 18:00 21:00 24:00 1 2 3 8 7 6 5 4 Overlapped Data 0

Item Description
1Time InformationDisplay the recording time of the currently playing data.
2Playback StatusDisplay the status of Play, Pause or Speed.
3Play BarMove to the start point of recording in the timeline.
Play reversely one frame by one.
Play reversely at a max of x64 speed by increasing by x2.
Play reversely.
3Play BarStop playing temporarily.
Play forward at normal speed.
Play forward at a max of x64 speed by increasing by x2.
Play forward one frame by one.
Move to the end point of recording in the timeline.
4Overlapped DataIt shows whether overlapping recordings exist for the same time line. If exist, user can select one to play.
5Expand/Collapse the timeline barEnlarge or shrink the time display bar.
6Fix/Release the timelineFix or release the timeline bar.- Timeline fixed: If the current position is out of the timeline range, the next timeline range will be shown accordingly. In the fixed state, you cannot move to the previous or next timeline range.- Timeline released: Even if the current position is out of the timeline range, the next timeline range will not be shown accordingly so the playback range can be different from the visible range. Only in the state of released timeline, you can move to the previous or next timeline range by the hour.
7MoveYou can expand the timeline and navigate through the timeline forward or backward.
8TimelineThe recording section (0 ~ 24 hr) of a specific date containing a search result will be displayed in a different color according to the recording reason.

SETUP VIEWER

Hardware

For more information, refer to "Hardware". (Page 12)

Register

You can add/edit/delete a desired device to/from NET-i ware.

Hardware Recording Event Backup Networks System Register Activation Camera Video • NET-1 says Information Name NET-1 says Description If Address 200.000.000 System Port 4500 Log the Device Auto Manual Cancel Apply

Camera Information

Once you select a video source for the web viewer, you can select a profile that will be monitored on the Live screen of the web viewer.

Hardware Recording Event Backup Network System Registrar Actuator Camera Video Copyright Information Name: JNJ-208.0.208-4529 (10V-5) Description: Resolution Video Marital PT2 Audio Host Viewer Video Source Live Streaming video source 1 Live Streaming video source 2 Recording Video Source Image 1x 3x 5x Video PS (HSPSS) Supported Supported Unit Streaming Video Source 3 Video PS (HSPSS) Video PS (HSPSS) Register Device Auto Manual Options E-mail: Update Device Setup Help Recommend Apply

Activation

To take advantage of the camera, you must activate the camera after registering it.

SAMSUNG NET-i ware - Activation - 1

- In the web viewer, the cameras will be sorted by index. And Find Object and Sort options are provided.

Hardware Recording Event Backup Network System Register Activation Current Video Criteria Activation 142.068.0.095-0339-127-25 Trial number of networks activates : 1 Criteria 142.068.0.095-0339-0339-25 Deconstructed Deconstructed Deconstructed ADD **. **

Camera

Turns On/Off the camera's Video, Audio, Audio Recording and Covert functions.

You can configure the settings so that only the video from the camera where

Hardware Recording Event Backup Network System Register Activation Camera Video Name Audio AudioRecord Cram 1 100.108.5.200-4528-1076- 100.108.5.200-4528-1076-61- 100.108.5.200-4528-1076-61- 100.108.5.200-4528-1076-61- 100.108.5.200-4528-1076-61- 100.108.5.200-4529-1076-61- 100.108.5.200-4529-1076-61- 100.108.5.200-4529-1076-61- 100.108.5.200-4530-1076-61- 100.108.5.200-4530-1076-61- 100.108.5.200-4531-1076-61- 100.108.5.200-4531-1076-61- 100.108.5.200-4532-1076-61- 100.108.5.200-4532-1076-61- 100.108.5.200-4533-1076-61- 100.108.5.200-4533-1076-61- 100.108.5.200-4534-1076-61- 100.108.5.200-4534-1076-61- 100.108.5.200-4535-1076-61- 100.108.5.200-4535-1076-61- 100.108.5.200-4536-1076-61- 100.108.5.200-4536-1076-61- 100.108.5.200-4537-1076-61- 100.108.5.200-4537-1076-61- 100.108.5.200-4538-1076-61- 100.108.5.200-4538-1076-61- 100.108.5.200-4539-1076-61- 100.108.5.200-4539-1076-61- 100.108.5.200-4540-1076-61- 100.108.5.200-4540-1076-61- 100.108.5.200-4541-1076-61- 100.108.5.200-4542-1076-61- 100.108.5.200-4543-1076-61- 100.108.5.200-4544-1076-61- 100.108.5.200-4545-1076-61- 100.108.5.20O Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured DuctURED Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured Ductured DuctUdS

Video

You can set Live 1, 2 or set the recording properties for an activated camera.

HOTTERIE Recording Event Backup Network System Register Activation Camera Video Live Streaming Video Source 1 Live Streaming Video Source 2 Recording Video Source No. Currency Name Record Action Frame rate Quality Completion Code Delete control 1 200,000,000 (400-100 Hz) CXCA(350*10Hz) 20fps 33 x 354 2 350,000,000 (400-100 Hz) CXCA(350*10Hz) 20fps 34 x 356 3 Create action 4 Create action 5 Create action 6 Create action 7 Create action 8 Create action 9 Create action 10 Create action 11 Create action 12 Create action 13 Create action 14 Create action 15 Create action 16 Create action 17 Create action 18 Create action Video profile status Current Name columns Reactions Quality New rules Compression Edit control Target State (X4 - X5=40Hz) MIP mode Apply

Record

For more information, refer to "Record Settings". (Page 20)

NET-i ware

It will display information about the current local disk.

You can assign cameras that you want to make recording for by the disk. Specify the minimum free space of the disk in General Settings.

Hardware Recording Event Backup Networks System NET-1 rows Schedule Event Camera HDD Information HDD Status Total space Lead space Free space Address Local Data (C:) System: 76.000 24.7.08 43.4.09 5.1 Mbps Local Data (D:) Percept: 6.808 4.4.09 5.1.08 5.1 Mbps Local Data (E:) Released: 215.000 6.1.08 215.4.08 4.3 Mbps Accession... Refresh... Camera Name USB: 166.6.30V/DCB: 10V-55 Auto Assignment Common Settings Minimum Free Space : 1.5 Options what disk is 1.5 Auto

NET-i Web Viewer

Schedule

You can access NET-i ware to make scheduled recording. Then, NET-i ware will start or stop recording according to the set schedule.

You can create one schedule and apply it to multiple cameras.

You can also create multiple schedules.

Hardware Recording Event Backup Network System BST - zone Schedule Event Controls 051.386.9.255.4328-674-61 + - + - + - Database information Name: Description: Add Delete... Add Delete

To make a schedule

From the web viewer, click the time table or specify an area to create a schedule to your preference.

Schedule Information Name: s1000 Description: 4521 Time Settings Start Time: 08:00 End Time: 23:59 Continuous Motion Action Visual Loss Intelligent Value Analysis OK Add Delete Schedule Information Continuous Motion Action Visual Loss Intelligent Value Analysis Close Apply

Event

To help the user better understand the event situation, you can specify the pre- and post-recording times from the event occurrence time.

Based on the event occurrence time, recording will be made for as much as specified for the pre- and post-recoding times.

Hardware Recording Event Backup Network System NET - store Structure Event Camera No. 1 (NZ-108.3.245-4726-109-04) 2 3 4 Apply

Camera

You can specify the frame rate (fps) for each active camera or recording type (normal/event).

Hardware Recording Event Backup Network System NET - name Schedule Event Address No. 1 2 3 4 Código Name: Normal HTTP ALL_MAMPS TCP/IP C++ HTTP ALL_MAMPS TCP/IP C++ TCP/IP TCP/IP C++ TCP/IP TCP/IP C++ TCP/IP TCP/IP C++ TCP/IP TCP/IP C++ TCP/IP TCP/IP C++ TCP/IP TCP/IP C++ TCP/IP TCP/IP C++ TCP/IP TCP/IP C++ TCP/IP TCP/IP C++ TCP/IP TCP/IP C++ TCP/IP TCP/IP C++ TCP/IP TCP/IP C++ TCP/IP TCP/IP

Event

For more information, refer to "To set an Event". (Page 27)

Camera

You can specify the discard time or set the alarm-in to synchronize with for each active camera.

The discard time is a time to discard (ignore) any duplicate event that occurs in the same time line.

You can also set the alarm-in for each camera, which will synchronize with the alarm-in occurring from the device.

Hardware Recording Event Backup Network System Camera T-mail Alert Sound Project No. Device Name Camera Name Event Record Term: Aires 1 FULLBAR B-2014-FEB20-SCH FULLBAR B-2014-FEB20-SCH-GS User 2 Discontinued Discontinued 3 Discontinued Discontinued 4 Discontinued Discontinued Apply

E-mail

You can set to send an email notice when an event occurs.

Hardware Recording Event Backup Network System Camera E-mail Alert Send Print Name: Description: Email Setup: To: Go: Subject: Edit Sender Name: Sender Address: Server Address: Port: New Web... New Authentication Send No: Camera Name: New Add Users: Connect User Address: New Add Delete Email Help Add Text Add Subs

NET-i Web Viewer

Alert Sound

A beep will sound the moment an event occurs.

SAMSUNG NET-i ware - Alert Sound - 1

In the web viewer, you cannot save or delete a .wav file that will be used as a beep.
- In the web viewer, you cannot play the .wav file (that will be used as a beep) in advance.

Handbags Recording Event Backup Networks Settings Camera Smart Soft Sound Project Sound Motion Alarm Video Loss Intelligent Audio Analyzer Auto specimens HDD HDD Pull HDD Pulse Auto specimens Apply No. Sound File Name shortcase software

Preset

As soon as an alarm occurs, you can set to move to a camera preset.

SAMSUNG NET-i ware - Preset - 1

- Press Refresh to update the current preset list.

Hardware Recording Event Backup Network System Currency Email Joint Sound Preset No. Actions Preset Camera Name Alarms Preset List Software Apply

Backup

For more information, refer to "Backup Setting". (Page 30)

Schedule

You can backup recording data according to the specified schedule.

Hardware Recording Event Backup Network System Schedule Network Drive No. Name Description Time Setup Start Time 30:00:00 Time Scape 30:00:00 Punch World Start Time 3.5% Time Scape 30:00:00 Backup Destination Place Center/12/12/12 Plan Details Select Current Status Add... Delete... Add...

Network Drive

If you use a network drive for scheduled backup, you can set the retry time (against a network failure) or specify the use of auto deletion of a backup file.

Hardware Recording Event Backup Network System SINCAI Network Drive Network drivers history Binary type: Binary start: Binary start time all initial Auto version of backup files: Data Apply

Network

For more information, refer to "Network Setting". (Page 31)

Interface

You can check and make necessary settings of the interface information.

SAMSUNG NET-i ware - Interface - 1

- The web viewer does not support UDP (Unicast/Multicast) settings.

Networks Recording Exit Backup Network System Interface BOMS Network Setting □ User Network 1 Network Auto Setting Transfer Settings □ No link □ User Network 2 Network Port System Port 4507 - 4506 - 4507 - 4508 - 4509 HTB Port 34 Straight Pulse Port 340 Remote user start 33 Preload Type 700 Apply

DDNS

Register NET-i ware with DDNS.

Hardware Recording Event Backup Network System Interface BONS BONS Property: Use BONS BONS line: electromagnetic net Load Name: www.bons.org/bons.org MAC ADDRESS: 00 09 21 89 33 65 Update Address: Minutes BONS Text Apply

System

For more information, refer to "System Setting". (Page 33)

User

You can add a user or user group and set the access permissions as necessary.

Accounts available include: default user group with the admin permissions and default user (admin).

Hardware Recording Event Backup Network System User Setting Log User Group Information Name: User Group Description: User Group and Add User Group Add User Delete

Setting

You can configure the NET-i ware settings to your preference.

SAMSUNG NET-i ware - Setting - 1

- If you change the current language in the web viewer, the new language will be applied only to the Setup menu of the web viewer.

(The OSD language for NET-i ware Tool, Service Manager and Update Manager will comply with that of NET-i ware Tool.)

  • The web viewer does not allow you to set the time and date display information.
  • The web viewer does not support any update process.
  • The web viewer does not allow you to create/edit the Windows logon account.
    In the web viewer, you can set the sequence time to between 10 seconds and 60 seconds.

Hardware Recording Event Backup Networks System Font Setting List Language English Descriptor Options Note: This is a recording file management option if the current custom time is changed to any option. Choose one of the following options: ● creates data between the changed custom time and the previous custom time. ○ Do not delete data between the changed custom time and the previous custom time. Portfolio □ Use Allowed SP - Add Set Installation □ Add □ Functions □ Recording □ Event □ Backup □ Referent □ System Installation Sequence Resource Type Users NTP Server RTP Client Restart setting NET Server Config Apply

Log

You can configure the log saving settings and search for an existing log.

Hardware Recording System Backup Networks System User Setting Log Setting Function: 51 Use System User Setup Backup Recording Home Alarm Water Line Intelligent Index Archive Apply Log View Data/Time Filter Type Filter Start Time: 2021-09-31 00:00 05:00:00 End Time: 2021-09-31 00:00 05:00:00 System User Update Write List Intelligent Index Archive Search No. Data/Time Type Conforts View temp: 52 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 Delete Search Results

ABOUT

Display the program version and creation date of the web viewer.

Samsung Web Viewer for NET-i ware Web Viewer Version: SNS-SF016_t1.38_120409 Copyright Samsung Techwin Co.Ltd.,2011

SAMSUNG

SALES NETWORK

SAMSUNG TECHWIN CO., LTD.

Samsungtechwin R&D Center, 701, Sampyeong-dong, Bundang-gu, Seongnam-si, Gyeonggi-do, Korea, 463-400

TEL: +82-70-7147-8740\~60 FAX: +82-31-8018-3745

100 Challenger Rd. Suite 700 Ridgefield Park, NJ 07660

Toll Free : +1-877-213-1222 Direct : +1-201-325-6920

Fax: +1-201-373-0124

www.samsungcctvusa.com

SAMSUNG TECHWIN EUROPE LTD.

Samsung House, 1000 Hillswood Drive, Hillswood Business Park

Chertsey, Surrey, UNITED KINGDOM KT16 OPS

TEL: +44-1932-45-5300 FAX: +44-1932-45-5325

www.samsungtechwin.com

www.samsungsecurity.com

www.samsungipolis.com

Table of contents Click a title to access it
Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : SAMSUNG

Model : NET-i ware

Category : Logiciel photo/vidéo