MODE D'EMPLOI CME EDR200 MELICONI

CME
EDR200

IT ISTRUZIONI DI MONTAGGIO
FR INSTRUCTIONS DE MONTAGE
EN MOUNTING INSTRUCTIONS
DE MONTAGEANLEITUNG
NL MONTAGEVOORSCHRIFT
ES GUIA DE MONTAJE
PT INSTRUÇÕES DE MONTAGEM
EL OÁNHÍEZ ΣΥΝΑΡΜΟΛΟΓΗΣΗΣ
RU ИНСТРУКЦИИ ПО УСТАНОВКЕ
PL INSTRUKCJA MONTAŽU
CZ NÁVOD K MONTAŽI
RO INSTRUCTI'UNI DE MONTARE
HU SZERELEŠI ÚTMUTATÓ
SE MONTERINGSANVISNINGAR
NO MONTERINGSINSTRUKSJONER
FI ASENNSUOHJEET

Qualità certificata
Certified quality
Certified quality
Meliconi S.p.A. - V. Minghetti, 10
40057 Cadriano di Granarolo E. (BO) Italy www.moliconi.com e mail: info@moliconi.com

text_image
Attrezzatura per montaggio
0.25 mm
0.8 mm (50mm)
13 mm
19 mm
5 mm
Dati tecnici
Caractéristiques techniques
Technical data
Datos técnicos
EDR200
mm 50x50
mm 75x75
mm 100x100
mm 200x200
VESA
mm 100x100
mm 200x200
L760565
L760123
L760195
L760176 (x2)
L760176 (x3)
L760176 (x4)
L760176 (x5)
L760176 (x6)
L760176 (x7)
L760176 (x8)
L760176 (x9)
L760176 (x10)
L760176 (x11)
L760176 (x12)
L760176 (x13)
L760176 (x14)
L760176 (x15)
L760176 (x16)
L760176 (x17)
L760176 (x18)
L760176 (x19)
L760176 (x20)
L760176 (x21)
L760176 (x22)
L760176 (x23)
L760176 (x24)
L760176 (x25)
L760176 (x26)
L760176 (x27)
L760176 (x28)
L760176 (x29)
L760176 (x30)
L760176 (x31)
L760176 (x32)
L760176 (x33)
L760176 (x34)
L760176 (x35)
L760176 (x36)
L760176 (x37)
L760176 (x38)
L760176 (x39)
L760176 (x40)
IT Dado autoblóccante, específico per evitar evtamerói accidentel. Avilare in mesarle decsa, con glí apopová afrezzi, anche dopo aver avrbito la prima résidenza.
FR Ézrou autoblóquant, concu pour éver tout desemage accidentel. Seme fermenter, avec les outils appropriés, même après avoir perçu la première résistance.
EN Self-locking nut, designed to prevent accidental loosening. Tighten firmly, with the correct tools, even after feeling the first resistance.
ES Tuerca autoblóvente para evitar que se adige.
Eroiscar a fondo con le herramientes específicas, incluso después de haber notado la resistencia inicial.
1





text_image
7 (x4)
Ø5 x 50
L686138
D486138
Ø8
20
L6864001
Ø9 x 30
C950203
Ø6 x 16
L7950244
Ø4 x 16
L950231
Ø4 x 12.2.8
L950204
TV (x4)
Ø6 x 16
C950344
18 (x2)
Ø6.4 x 16
L6313011
20A
Ø8
L6864001
16 (x3)
Ø9
L8663204
17 (x3)
Ø8.4 x 20
L6313008
13 (x2)
Ø6
L9502019
11 (x2)
Ø6 x 49
L7950276
Ø9 x 75
L950271

text_image
OK!
2
X+Y=9,5 cm (3.7")
3
60 mm (2.4")
Ø 8 mm
max 12 mm (0.5")
4
7 (x4)
2
X+Y=9,5 cm (3.7")
3
Ø 2,5 mm
60 mm (2.4")
max 12 mm (0.5")
4
7 (x4)
M9990029 - Istruzioni - CME EDR200 - 05-2021-021.pdf 2 11/05/2021 15:33:10


text_image
IT = International's revised implementation for future development. As a result of the implementation of the project, it is not to be implemented in any way to ensure that the project is suitable for future development. The project is suitable for future development. The project is suitable for future development. The project is suitable for future development. The project is suitable for future development. The project is suitable for future development. The project is suitable for future development. The project is suitable for future development. The project is suitable for future development. The project is suitable for future development. The project is suitable for future development. The project is suitable for future development. The project is suitable for future development. The project is suitable only for future development. The project is suitable for future development. The project is suitable for future development. The project is suitable for future development. The project is suitable for future development. The project is suitable for future development. The project is suitable for future development. The project is suitable for future development. The project is suitable for future development. The project is suitable for future development. The project is suitable for future development. The project is suitable for future development. The project is suitable for future development.
The project is suitable for future development.
The project is suitable for future development.
The project is suitable for future development.
The project is suitable for future development.
The project is suitable for future development.
The project is suitable for future development.
The project is suitable for future development.
The project is suitable for future development.
The project is suitable for future development.
The project is suitable for future development.
The project is suitable for future development.
The project is suitable for future development.
The project is suitable only for future development.
The project is suitable for future development.
The project is suitable for future development.
The project is suitable for future development.
The project is suitable for future development.
The project is suitable only for future development.
The project is suitable for future development.
The project is suitable for future development.
The project is suitable only for future development.
The project is suitable only for future development.
The project is suitable only for future development.
The project is suitable only for future development.
The project is suitable only for future development.
The project is suitable only for future development.
The project is suitable only for future development.
The project is suitable only for future development.
The project is suitable only for future development.
The project is suitable only for future development.
The project is suitable only for future development.
The project is suitable only one or more than five years since 2016, except if required by the Planetary Administration of the Project (Designated). This may require an additional number of projects to be completed within the first year of the period, so if required by the Planetary Administration of the Project (Designated) must be completed within the last year of the period, so if required by the Planetary Administration of the Project (Designated) must be completed within the last year of the period, so if required by the Planetary Administration of the Project (Designated) must be completed within the last year of the period, so if required by the Planetary Administration of the Project (Designated) must be completed within the last year of the period, so if required by the Planetary Administration of the Project (Designated) must have been completed within the last year of the period, so if required by the Planetary Administration of the Project (Designated) must have been completed within the last year of the period, so if required by the Planetary Administration of the Project (Designated) must have been completed within the last year of the period, so if required by the Planetary Administration of the Project (Designated) must have been completed within the last year of the period, so if required by the Planetary Administration of The Project (Designated) must have been completed within the last year of the period, so if required by the Planetary Administration of The Project (Designated) must have been completed within the last year of the period, so if required by the Planetary Administration of The Project (Designated) must have been completed within the last year of the period, so if required by the Planetary Administration of The Project (Designated) must have been completed within the last year of the period, so as required by the Planetary Administration of The Project (Designated) must have been completed within the last year of the period, so if required by the Planetary Administration of The Project (Designated) must have been completed within the last year of the period, so if required by the Planetary Administration of The Project (Designated) must have been completed within the last year of the period, so if required by the Planetary Administration of The Project (Designated) must have been completed within this period, so if required by the Planetary Administration of The Project (Designated) must have been completed within this period, so if required by the Planetary Administration of The Project (Designated) must have been completed within this period, so if required by the Planetary Administration of The Project (Designated) must have been completed within this period, so if required by the Planetary Administration of The Project (Designated) must have been completed within this period, so if required by the Panama Administration of Thailand (Designated) must have been completed within this period, so if required by the Panama Administration of Thailand (Designated) must have been completed within this period, so if required by the Panama Administration of Thailand (Designated) must have been completed within this period, so if required by the Panama Administration of Thailand (Designated) must have been completed within this period, so if required by the Panama Administration of Thailand (Designated) must have been completed within this period, so if required to be completed within this period, so if required to be completed within this period, so if required to be completed within this period, so if required to be completed within this period, so if required to be completed within this period, so if required to be completed within this period, so if required to be completed within this period, so if required to be completed within this period, so if required to be completed within this period, so if required to be completed within this period, so if required to have been completed within this period, so if required to be completed within this period, so if required to be completed within this period, so if required to be completed within this period, so if required to be completed within this period, so if required to be completed within this period, so if required to be completed within this period, so if required to be completed within this period, so if required to be completed within this period, so if required to be completed within this period, so if needed until it has been completed within this period.