Product Type Outdoor Day/Night Vari-focal HD IP Camera
Model GXV3674_HD_VF (720p) / GXV3674_FHD_VF (1080p)
Image Sensor 1/3" Progressive Scan CMOS
Resolution Up to 1280x960 (HD) or 2048x1536 (FHD)
Lens Vari-focal 2.8~12 mm, F1.4, DC-IRIS
Field of View Horizontal: 90° ~ 28°
Minimum Illumination 0.05 Lux (color), 0 Lux with IR
IR Distance Up to 25m (IR LED)
Video Compression H.264 (Baseline/Main/High Profile), MJPEG
Audio G.711 μ/A-law, Line In/Out (3.5mm)
Network Protocols TCP/IP, UDP, RTP/RTCP, RTSP, DHCP, DDNS, HTTP, HTTPS, SMTP, FTP, NTP, SIP
Power over Ethernet (PoE) IEEE 802.3af, Class 0
Power Adapter DC 12V/1A (included)
Dimensions (L x W x H) 255 x 104 x 187 mm
Weight 1.10 kg
Operating Temperature -20°C ~ +50°C (-4°F ~ 122°F)
Ingress Protection IP66 (weatherproof metal case)
Motion Detection Up to 16 target areas
Privacy Mask Up to 4 zones
SIP/VoIP Support Yes, for alarm calling
Management GSurf Pro (free, up to 72 cameras), GVR3550 NVR, ONVIF
Compliance FCC Part 15B, EN 55022/55024, IP66

Frequently Asked Questions - GXV3674_HD GRANDSTREAM

What is the default IP address of the GXV3674_HD/FHD_VF v2?
The default IP configuration is DHCP. If no DHCP server is available, the camera will use a fallback static IP of 192.168.1.168 after 5 minutes.
How can I view the live video stream in my web browser?
You need to install the Grandstream WebControl plug-in (for Firefox/Chrome) or ActiveX control (for Internet Explorer). Download the plug-in from the Grandstream website and ensure your antivirus is temporarily disabled during installation.
Why can't I access the web configuration interface?
Check that your PC and camera are on the same subnet. Verify the camera's IP address (use GS Search tool). Ensure the HTTP port (default 80) is not blocked by your network or changed. Also try rebooting the camera.
How do I reset the camera to factory defaults?
Log in to the web interface, go to Advanced Settings > Maintenance, and click Restore. Note that the IP address is retained after restore. To reset IP as well, use the hardware reset button (if available) or contact support.
Can I use PoE to power the camera?
Yes, the camera supports IEEE 802.3af PoE (Class 0). Connect an Ethernet cable from the camera to a PoE switch or injector. Alternatively, use the included 12V DC power adapter.
How do I set up motion detection and receive alerts?
Go to Advanced Settings > Motion Detection. Enable motion detection, configure up to 16 regions and sensitivity. Set alarm actions like record video, send email (via SMTP), upload to FTP, or call a SIP phone. Also configure the time schedule for the detection to be active.
How can I view the camera remotely from a smartphone?
Use apps like IP Cam Viewer from Google Play or Apple Store. Ensure the camera's HTTP and RTSP ports are forwarded on your router (RTSP port = HTTP port + 2000 if HTTP port is not 80). For best performance, set the secondary stream to QCIF resolution and 64 kbps bitrate.
Why is Windows Media Player unable to play recorded video files?
The camera records in H.264 format. Windows Media Player may lack the proper decoder. Install a free H.264 decoder like FFDShow or use a third-party player like VLC.
How do I configure the camera for SIP video calling?
Go to Basic Settings > SIP Settings. Enter the SIP Server (IP or domain), SIP User ID, Authenticate ID, and Password. Ensure the camera registers successfully (status shows 'Online'). Configure the 'Phone List for Alarm Out' to dial a video phone number when an alarm is triggered.
What is the maximum SD card storage supported?
The GXV3674_HD/FHD_VF v2 does not have a built-in SD card slot. Video recording requires a network video recorder (NVR), a PC with GSurf Pro, or FTP/SMTP upload.

User questions about GXV3674_HD GRANDSTREAM

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Security Camera in PDF format for free! Find your manual GXV3674_HD - GRANDSTREAM and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. GXV3674_HD by GRANDSTREAM.

USER MANUAL GXV3674_HD GRANDSTREAM

Grandstream Networks, Inc.

Outdoor Day/Night Vari-focal HD IP Camera

GRANDSTREAM GXV3674_HD - Grandstream Networks, Inc. - 1

natural_image Close-up of a security camera with central lens and mounted sensor base (no visible text or symbols)

GRANDSTREAM GXV3674_HD - Grandstream Networks, Inc. - 2

natural_image Exterior view of a white GrandSTREAM security camera mounted on a wall (no visible text or symbols on the device body)

This page intentionally left blank

TABLE OF CONTENTS

RF EXPOSURE INFORMATION (SAR) 7

WARRANTY 8

CONNECT YOUR GXV3674 HD/FHD VF V2....9

EQUIPMENT PACKAGE CONTENTS....9

CONNECTING THE GXV3674_HD/FHD_VF v2....10

PRODUCT OVERVIEW 11

NETWORKING SETTING PAGE 31

DDNS SETTINGS PAGE 32

SIP SETTING PAGE 33

STATUS PAGE 36

ADVANCED SETTINGS EXPLANATION....37

USER MANAGEMENT PAGE 37

MAINTENANCE PAGE 38

SMTP SETTING PAGE (EMAIL ALARM) 41

FTP SETTINGS PAGE (UPLOAD ALARM) 43

PRIVACY MASKS 44

ALARM SERVER SETTINGS PAGE (UPLOAD ALARM TO SUPPORTED VMS OR HTTP SERVER) 45

TIME LAPSE PHOTOGRAPHY 46

MOTION DETECTION CONFIGURATION PAGE (SET ALARM) 47

REMOTE ALARM OUT PEERING WITH GXV3500 DECODER.... 51

CONFIGURE SIP OPEN DOOR PEERING WITH GVR355X NVR 55

SYSLOG SETTINGS PAGE (TROUBLESHOOTING HELP)....61

SOFTWARE UPGRADE 62

INSTRUCTIONS FOR LOCAL FIRMWARE UPGRADE USING TFTP SERVER: 63

FIGURE 4-1: APPLE SAFARI "BONJOUR" SETTING PAGE TO DISPLAY GXV3674_HD/FHD V2 ...... 16

FIGURE 4-2: APPLE SAFARI "BONJOUR" SETTING PAGE TO DISPLAY GXV3674_HD/FHD_VF v2....16

FIGURE 5-1: GXV3674_HD/FHD_VF v2 WORKING IN LAN....19

FIGURE 5-2: GXV3674_HD/FHD_VF v2 WORKING WITH GVR3550 AND/OR GSURF_PRO WITH INTERNET .....20

FIGURE 6: APPLICATION PERIPHERAL CONNECTION FOR GXV3674_HD/FHD_VF v2....21

FIGURE 7: HOME PAGE OF GXV3674_HD/FHD_VF v2....23

FIGURE 8: WEB LANGUAGE SWITCH 24

FIGURE 9: SYSTEM SETTINGS PAGE....25

FIGURE 10-1: VIDEO & AUDIO SETTINGS PAGE....26

FIGURE 10-2: VIDEO & AUDIO SETTINGS PAGE....27

FIGURE 11: OSD SETTINGS PAGE....28

FIGURE 12: CMOS SETTINGS PAGE....29

FIGURE 13: NETWORKING SETTING PAGE....31

FIGURE 14: DDNS SETTING PAGE....32

FIGURE 15-1: SIP SETTING PAGE....33

FIGURE 15-2: SIP SETTING PAGE....34

FIGURE 15-3: SIP SETTING PAGE....35

FIGURE 16: STATUS PAGE....36

FIGURE 17: USER MANAGEMENT PAGE....37

FIGURE 18: MAINTENANCE PAGE 38

FIGURE 19-1: SMTP SETTING PAGE....41

FIGURE 19-2: SMTP SETTING PAGE 42

FIGURE 20: FTP SETTING PAGE....43

FIGURE 21: PRIVACY MASKS CONFIGURATION PAGE....44

FIGURE 22: ALARM HTTP SERVER SETTING PAGE 45

FIGURE 23: TIME LAPSE PHOTOGRAPHY CONFIGURATION PAGE....46

FIGURE 24-1: MOTION DETECTION CONFIGURATION PAGE....47

FIGURE 24-2: MOTION DETECTION CONFIGURATION PAGE....48

FIGURE 24-3: MOTION DETECTION SCHEDULE CONFIGURATION PAGE....49

FIGURE 24-4: REMOTE ALARM_OUT IP CAMERA CONFIGURATION ....51

FIGURE 24-5: REMOTE ALARM_OUT PEERING GXV3500 CONFIGURATION....52

FIGURE 24-6: REMOTE ALARM_OUT PEERING GXV3500 ACTION OUTPUT DISPLAY .... 53

FIGURE 24-7: PEERING GXV3500 DECODER ALARM_OUT CIRCUIT....53

FIGURE 25-1: GXV355X OPEN DOOR CONFIGURATION .... 57

FIGURE 25-2: ALARM_IN AND ALARM_OUT CONNECTION CIRCUIT SAMPLE FOR GVR355X ....58

FIGURE 25-3: ALARM_IN AND ALARM_OUT WIRING DIAGRAM FOR GVR355X....59

FIGURE 25-4: GVR355X ALARM_OUT CIRCUIT MEASUREMENT 60

FIGURE 26: ALARM SERVER SETTING PAGE....61

FIGURE 27: FIRMWARE UPGRADE AND PROVISIONING ....62

FIGURE 28: FACTORY RESET FROM WEB INTERFACE 64

TABLE OF TABLES

Thank you for purchasing Grandstream's GXV3674_HD/FHD_VF v2 Outdoor Day/Night High Definition IP Camera, an innovative powerful weatherproof infrared next generation network camera. Its advanced ISP (Image Sensor Processor) powered with state-of-the-art auto-exposure/auto-white-balance algorithm and a high quality lens, ensures high fidelity video quality that matches digital still camera color grade in a wide range of light environments. It features cutting edge H.264 real-time video compression with excellent image clarity (720p for GXV3674_HD_VF; 1080p for GXV3674_FHD_VF) and color fidelity, industry leading SIP/VoIP for video streaming to smartphones and video phones, integrated PoE, IR-CUT (mechanical) for day or night mod, and advanced security protection using strong encryption.

The GXV3674_HD/FHD_VF v2 can be managed with GSurf Pro (Grandstream's intuitive FREE video management software that controls up to 72 cameras simultaneously), or grouped with GVR3550 Grandstream Network Video Recorder (NVR) via plug-n-play, as well as other ONVIF compliant video management systems. It also offers an advanced and flexible HTTP API and an SDK for easy integration with other surveillance systems.

Designed for both indoor and outdoor environment, the GXV3674_HD/FHD_VF v2 Day/Night HD IP camera is a new addition to the popular GXV3XXX series IP surveillance product family. It ensures ease of use, integration and deployment, with multilingual graphical user interface, provides powerful solution to professional surveillance applications.

Ideal application scenes for GXV3674_HD/FHD_VF v2 are like store, parking lot, elevator, office, crossing road point, and other indoor or outdoor related environments.

This manual will help you to learn how to operate and manage your GXV3674_HD/FHD_VF v2 Outdoor Day/Night HD IP camera and make the best use of it.

SAFETY COMPLIANCES

These instructions are intended to assist users to safely operate the GXV3674_HD/FHD V2, avoid dangerous situations or damage the device.

Warning: May cause serious injury or death if any of the warnings below are neglected.Caution: Equipment may be damaged if any of the following caution messages are neglected.

GRANDSTREAM GXV3674_HD - SAFETY COMPLIANCES - 1

Warning:

Input voltage should meet both the SELV (Safety Extra Low Voltage) and the Limited Power Source with DC 12V according to the IEC60950-1 standard. Please refer to the technical specifications for more details. Do not use a third-party power adapter or power cord. When the device installed on the wall or ceiling, make sure that it is firmly attached.

GRANDSTREAM GXV3674_HD - Warning: - 1

Caution:

  • Make sure that the power supply voltage is correct before using the camera.
  • Do not drop the device or expose it to physical shock.
  • Do not expose the device to temperatures outside the range of -20^ to 50^ when the device is in operation.
  • Do not expose the device to damp/wet conditions or high electromagnetism radiation.
  • To avoid heat accumulation, make sure that your operating environment has proper ventilation.
  • Do not damage the warranty sticker.

A few parts (e.g. electrolytic capacitor) of the equipment shall be replaced regularly according to their average lifetime. The average lifetime varies from the differences between operating environments and usage history. Regular maintenance checks are recommended for all users. Please contact your dealer for more details.

FCC CAUTION

Any Changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment. This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions:

1) This device may not cause harmful interference.
2) This device must accept any interference received, including interference that may cause undesired operation.

Note: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules.

These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures:

— Reorient or relocate the receiving antenna.
— Increase the separation between the equipment and receiver.
— Connect the equipment into an outlet on a circuit different from that to which the receiver is connected.
— Consult the dealer or an experienced radio/TV technician for help.

RF EXPOSURE INFORMATION (SAR)

This device is designed and manufactured not to be exceeded the emission limits for exposure to radio frequency RF energy set by the Federal Communications Commission of the United States. The exposure standard for wireless devices employing a unit of measurement is known as the Specific Absorption Rate (SAR), and the SAR limit set by FCC is 1.6 W/kg.

This device is complied with SAR for general population/uncontrolled exposure limits in ANSI/IEEE C95.1-1992, and has been tested in accordance with the measurement methods and procedures specified in OET Bulletin 65 Supplement C. This device has been tested, and meets the FCC RF exposure guidelines when tested with the device directly contacted to the body. RF exposure compliance with anybody-worn accessory, which contains metal, was not tested and certified, and uses such body-worn accessory, should be avoided.

Changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment.

Hereby, Grandstream declares that this device is in compliance with the essential requirements and other relevant provisions of Directive 1999/5/EC.

WARRANTY

If you purchased your GXV3674_HD/FHD_VF v2 from a reseller, please contact the company where you purchased the device for replacement, repair or refund.

If the device was purchased directly from Grandstream, please contact our technical support team for a RMA (Return Materials Authorization) number before the product is returned.

Grandstream reserves the right to remedy warranty policy without prior notification.

GRANDSTREAM GXV3674_HD - WARRANTY - 1

Caution:

Changes or modifications to this product not expressly approved by Grandstream, or operation of this product in any way other than as detailed by this User Manual, could void your manufacturer warranty. Please do not use a different power adaptor with the GXV3674_HD/FHD_VF v2 as it may cause damage to the products and void the manufacturer warranty.

- This document is subject to change without notice. The latest electronic version of this user manual is available for download at:

http://www.grandstream.com/sites/default/files/Resources/GXV3674hd_fhd_v2_usermanual_english.pdf

Reproduction or transmittal of the entire or any part, in any form or by any means, electronic or print, for any purpose is not permitted without the express written permission of Grandstream Networks, Inc.

Equipment Package Contents

The GXV3674_HD/FHD_VF v2 package contains:

• GXV3674_HD/FHD_VF v2 IP Camera
• 12V DC Universal Power Adaptor
- Ethernet Cable
• Hex Key and 4 Screws and Wall Anchors
• Quick Installation Guide and GNU GPL license

GRANDSTREAM GXV3674_HD - Equipment Package Contents - 1

natural_image Line drawing of a surveillance camera with attached cable (no text or symbols)

1 X GXV3674_HD/FHD_VF

12V

1 x 12V Power Supply

GRANDSTREAM GXV3674_HD - Equipment Package Contents - 3
1 x Ethernet Cable

GRANDSTREAM GXV3674_HD - Equipment Package Contents - 4

GRANDSTREAM GXV3674_HD - Equipment Package Contents - 5
4 x Wall Anchors

GRANDSTREAM GXV3674_HD - Equipment Package Contents - 6
4 x Screws

GRANDSTREAM GXV3674_HD - Equipment Package Contents - 7
1 x Hex Key

GRANDSTREAM GXV3674_HD - Equipment Package Contents - 8
1 x Quick Start Guide
1 x GPL License

Using the Power Adapter as power supply

Connect the RJ-45 Ethernet cable to the NETWORK port of the GXV3674_HD/FHD_VF
Connect the other end of the RJ-45 cable to your network (switch or router or PC)
Connect the power supply to the DC 12V power jack on the back of the GXV3674_HD/FHD_VF

Using PoE as power supply

Connect the RJ-45 Ethernet cable to the NETWORK port of GXV3674_HD/FHD v2
Connect the other end of the RJ-45 cable to your PoE switch.
➢ PoE injector can be used if PoE switch is not available.

Please refer to following connection diagram to hook up the camera.

3.5mm Audio_Out, Audio_In Ports Network Port Power Port Option A: Power Adapter To AC Outlet Option B:

Option B: RJ45 Ethernet Cable to Power over Ethernet (PoE) Switch

NOTE: Choose Option A if using the power supply; or choose Option B if using a Power over Ethernet (PoE) switch.

PRODUCT OVERVIEW

Figure 1: GXV3674_HD/FHD_VF v2 Illustration

  1. Screw and Top Cover
    GXV3674_HD/FHD_VF v2 screw and Top Cover Plate
  2. IR LED Light
    IR LED light array for Night Mode
  3. LENs
    Adjustable Vari-focal Lens
  4. IR CUT Sensor
    IR-Cut Photonic Sensor
  5. Far/Near Adjustment
    Far/Near (Zoom Out/In) Adjustment screw
  6. Focus Adjustment
    Focus Adjustment screw

NOTE:

For accuracy, please use screwdriver to adjust the Far/Near and Focus screws.

Model v2GXV3674_HD_VFGXV3674_FHD_VF
Video CompressionH.264, MJPEG
Image Sensor Resolution1/3", 1.2 Megapixel Progressive Scan CMOS, 1280H x 960V1/3", 3.1 Megapixel Progressive Scan CMOS, 2048H x 1536V
Image Sensor SensitivityDay/Night mode, exceptionally low noise & low light sensitivity.Shutter: 1/10000 - 1/30 second
Focal Length2.8 ~ 12 mm
ApertureF1.4, DC-IRIS
Field Angle (FOV)90° ~ 28° (Horizontal Field)
IR Cut FilterYes, Mechanical
Day & Night ModeIR LED covering up to 25m
Minimum Illumination0.05 Lux, 0 lux with IR
Responsivity5.48V/lux-sec (550nm)1.9V/lux-sec (550nm)
Supported Maximum Video Resolution and Frame Rate1280x960 (25fps)1280x720 (30fps)2048x1536 (15fps)1920x1080 (30fps)
Video Bit Rate32 Kbps ~ 8 Mbps, multi-rate for preview & recording
Audio InputLine-In, 1500 ohms, 0.1Vrms ~ 0.707Vrms, 3.5mm
Audio OutputLine-Out, 600 ohms, 0.707Vrms, 3.5mm
Audio CompressionG.711u/a (PCMU or PCMA)
Embedded AnalyticsMotion Detection (up to 16 target areas)
Pre-/post-alarm RecordingYes, 8MBYes, 3MB
WDR (Wide Dynamic Range)NoYes (100dB)
SnapshotsTriggered upon events, send via email/FTP
Network ProtocolTCP/UDP/IP, RTP/RTCP, RTSP, DHCP, DDNS, HTTP, HTTPS, SMTP, FTP, NTP
SIP/VoIP SupportYes
Time-Lapse PhotographyYes
Privacy Mask SupportYes, 4 Zones
Power over Ethernet (PoE)IEEE 802.3af, Class 0
External Cable ConnectionNetwork: RJ45, 10M/100M auto-sensing3.5mm Line-In3.5mm Line-OutPower Input
Dimensions (L x W x H)255mm (L) x 104mm (W) x 187mm (H)
Weight1.10kg
Temperature / HumidityOperating: -20°C ~ +50°C (-4°F ~ 122°F), 10–90% RH (non-condensing)Storage: -30°C ~ +60°C (-22°F ~ 140°F)
Power AdapterOutput: 12VDC/1A; Input: 100–240VAC, 50–60Hz
CasingIP66 compliant weather-proof metal case
ComplianceFCC Part 15,Subpart B Class B; EN 55022 Class B,EN 61000-3-2, EN 61000-3-3, EN 55024, EN 60950-1;C-tick AS/NZS CISPR 22, IP66

Table 1: GXV3674_HD/FHD_VF v2 Technical Specifications

INSTALLATION GUIDE

To install GXV3674_HD/FHD_VF v2, you will have a computer, PC recommend.

The minimum recommended PC system requirement listed below:

• Windows XP, Windows Vista, Windows 7 and Windows 8
• CPU: Intel Pentium 4 or higher, 2 GHz
• RAM: 2 GB (4 GB recommended for larger systems)
• Support for DirectX 8.0 and above.

Configure the GXV3674\_HD/FHD\_VF v2 via Web Browser

The GXV3674_HD/FHD V2 has embedded Web server to respond to HTTP GET/POST requests.

Embedded HTML pages allow user to configure the IP camera through Microsoft Internet Explorer (7.0 or above), Firefox, Chrome (plug-in from Grandstream required).

- Download WebControl Plug-in from Grandstream website:

http://www.grandstream.com/sites/default/files/Resources/GSurf_Pro_V2_1.0.3.13.zip

For Apple platform OS-X, only MJPEG video coded supported currently.

NOTE:

➢ Please temporarily disable Antivirus or Internet Security Software when download and install the Grandstream WebControl Plug-in for Firefox/Chrome or “GSViewerX.cab” for Microsoft Internet Explorer. Please close Browser to install the downloaded Plug-in or Active-X.
➢ Please trust and install the file downloaded if prompted by the Antivirus or Security software.

The GXV3674_HD/FHD_VF v2 by default enabled as DHCP client, it will automatically get IP address from the network with DHCP server running.

WINDOWS PLATFORM:

There are two ways for Windows user to get access to the IP Camera easily:

A. UPnP

By default, the GXV3674_HD/FHD_VF v2 has the UPnP feature turned ON. For customers using Window network with UPnP turned on (most SOHO router support UPnP), it is very easy to access the IP camera:

GRANDSTREAM GXV3674_HD - UPnP - 1

• Find the “Network” icon at Windows Desktop.

- Click the icon to get into the “Network” and the IP cameras will list as “Other Devices” shown like below. Refresh the pages if nothing displayed. Otherwise, the UPnP may not active in the network.

▲ Other Devices (8)

GRANDSTREAM GXV3674_HD - UPnP - 2

[TV]Samsung LED40

GRANDSTREAM GXV3674_HD - UPnP - 3

[TV] Samsung LED40

GRANDSTREAM GXV3674_HD - UPnP - 4

3504-000b821dd012

GRANDSTREAM GXV3674_HD - UPnP - 5

GXV3610_FHD - 000b82586afc

GRANDSTREAM GXV3674_HD - UPnP - 6

GXV3610_HD-000b8260bcfb

GRANDSTREAM GXV3674_HD - UPnP - 7

GKV3615WP1_HD - 000b826c9c9e

GRANDSTREAM GXV3674_HD - UPnP - 8

GXV3672_FHD - 000b825ce0ae

GRANDSTREAM GXV3674_HD - UPnP - 9

GXV3672_FHD - 000b8263bc6b

Figure 2: Windows "Network" showing GXV3674_HD/FHD_VF v2 as "Other Devices" via UPnP

- Click the displayed icon of related IP camera, the default browser (e.g.: Firefox or Chrome) will open and connect directly to the camera's webpage, prompt message will display asking for plug-in installation.

- Disable security or antivirus software, download the plug-in, close browser and install the plug-in, open the browser again, the embedded video will be displayed if clicking the icon of the related IP Camera.

B. "GS Search" Utility Tool

User can know the IP address assigned to the camera from DHCP server log or using the Grandstream GS_Search tool. Following is the instruction for using "GS_Search" utility tool:

  1. Download the GS_Search tool from Grandstream website:
    http://www.grandstream.com/products/tools/surveillance/GS_Search.zip
  2. Run the Grandstream GS_Search tool by double click the unzipped "GS_Search.exe".
  3. Click on the Search button to begin device detection
  4. The detected devices will appear in the output field like below

Index NVR GVR3550EP2 IPCAMERA GXV3651FHD IPCAMERA GXV3662FHD IPCAMERA GXV3500 IPCAMERA GXV3662HD DECODER GXV3500 IPCAMERA GXV3610 HD IPCAMERA GXV3672_FHD IPCAMERA GXV3610_FHD IPCAMERA GXV3615wPI... IPCAMERA GXV3611IR_HD Search Add IP Address Configuration Wifi Configuration Old IP Use DHCP New IP Sub net mask Gate way Modify IP 1.0.0.71 1.0.1.90 1.0.1.90 1.0.1.90 1.0.3.5 1.0.3.5 1.0.3.5 1.0.3.5 1.0.3.5 192.168.22.57 192.168.22.116 192.168.22.144 192.168.22.184 192.168.22.71 192.168.22.70 192.168.22.78 192.168.22.73 192.168.22.106 192.168.22.84 192.168.22.107 554 554 554 554 554 554 554 554 554 554 554 554 554 554 554 554 554 554 554 554 554 554 554 554 554 556 556 556 556 556 556 556 556 556 556 556

Figure 3: "GS_Search" Result Page of GXV3674_HD/FHD_VF v2

  1. Double click the column of the detected camera, the browser will automatically open and link to the device IP and the web configuration page.
  2. The browser will ask for plug-in or ActiveX if not installed, otherwise it will get to Home page and start to show the video captured by the camera (by default the camera enabled anonymous access)
  3. Click "Configuration" icon, the browser will ask credentials to authorize configuration.
  4. Enter the administrator user name and password to access the Web Configuration Interface, the default user name and password are both set to admin.
  5. In step 6, browser will indicate that "This website wants to install the following add-on: GSViewerX.cab from Grandstream Networks Inc." Please allow the installation.
  6. The plug-in can be download here: http://www.grandstream.com/sites/default/files/Resources/GSurf_Pro_V2_1.0.3.13.zip

APPLE PLATFORM:

For Apple users, please turn on Bonjour of Safari to find and access the GXV3674_HD/FHD_VF v2.

1) Open Safari, select "Advanced" to open the Advanced Setting.
2) Click "Include Bonjour in the Bookmarks menu" and "Include Bonjour in the Favorites bar" then close the setting page and back to Safari.

Advanced General Tabs AutoFill Password Security Privacy Notifications Extensions Advanced Accessibility: Never use font sizes smaller than 9 Press Tab to highlight each item on a webpage Option-Tab highlights each item. Bonjour: Include Bonjour in the Bookmarks menu Include Bonjour in the Favorites bar Internet plug-ins: Stop plug-ins to save power Plug-ins start automatically on 8 websites Details... Style sheet: None Selected Default encoding: Western (ISO Latin 1) Proxies: Change Settings... Show Develop menu in menu bar

Figure 4-1: Apple Safari "Bonjour" Setting page to display GXV3674_HD/FHD V2

3) Bonjour will now display embedded at Safari. Select "Bonjour" pull-down menu and select "Webpages", the related IP Camera like GXV3674_HD/FHD_VF v2 will be there.

Safari File Edit View History Bookmarks Window Help Search Google or enter an address Bonjour Mission 272...endra Modi Buy Cool, F...ewakoof.com 40 Things E...Should About Bonjour Webpages Grandstream GXV3672_FHD - 000B8263BC6B

Figure 4-2: Apple Safari "Bonjour" Setting page to display GXV3674_HD/FHD_VF v2

4) Click the displayed camera to access to the configuration page of the camera.

5) To see the video, user has to change the video codec from default H.264 to MJPEG, and type in following to URL:

http://IP_Address_Camera:Port/mjpeg/mjpegX.html

(X: 0, 4 represent 1 ^st , 2 ^nd stream, Default Port: 80)

Safari File Edit View History Bookmarks Window legrand-000b8227fd40.local Reminear * Mission 272...andra Medi Buy Cool, F...xwakof.com 08/08/2016 Pri 15:14:00

NOTE:

The instruction given here based on Safari/OS-X, other Apple platform like iOS (iPhone/iPad) can use similar method.

About This Mac OS X Version 10.9.4 Software Update... Processor 2.5 GHz Intel Core i5 Memory 8 GB 1600 MHz DDR3 More Info... TM and © 1983-2014 Apple Inc. All Rights Reserved. License Agreement

Safari Version 7.0.5 (9537.77.4) Copyright © 2003-2014 Apple Inc. All rights reserved.

iPhone/iPad (iOS) users are recommended to use Applications in Apple Store.
➢ Free or Paid applications from Apple Store like “IP Cam Viewer” are suggested and verified working with Grandstream IP Cameras like GXV3674_HD/FHD_VF v2.
Apple Store applications like "IP Cam Viewer" will support H.264 video codec.

Connect to the Camera using Static IP

If no DHCP server in the network, or the camera does not get IP from DHCP server, user can connect the camera to a computer directly, using static IP to configure the camera.

The default IP, if no DHCP server; or DHCP offer time out (3 minutes), is 192.168.1.168

  1. Connect the computer RJ-45 via an Ethernet cable directly to the IP camera GXV3674_HD/FHD_VF v2.

  2. Configure the computer using Static IP: 192.168.1.XXX (1<XXX<255, but NOT 168) and configure the "Subnet mask" to "255.255.255.0". Leave the "Default Gateway" to "Blank" like below:

Internet Protocol Version 4 (TCP/IPv4) Properties General You can get IP settings assigned automatically if your network supports this capability. Otherwise, you need to ask your network administrator for the appropriate IP settings. Obtain an IP address automatically Use the following IP address IP address: 192 . 168 . 1 . 10 Subnet mask: 255 . 255 . 255 . 0 Default gateway: Obtain DNS server address automatically Use the following DNS server addresses: Preferred DNS server: . Alternate DNS server: . Validate settings upon exit Advanced... OK Cancel

  1. Power on the GXV3674_HD/FHD_VF v2.

  2. Start the IE or Firefox browser when the network connection is up.

  3. Enter 192.168.1.168 in the address bar of the browser.

  4. The browser will ask for plug-in or ActiveX if not installed, otherwise it will get to Home page and start to show the video captured by the camera (by default the camera enabled anonymous access)

  5. Click "Configuration", the browser will ask credentials to authorize configuration.

  6. Enter the administrator user name and password to access the Web Configuration Interface, the default user name and password are both set to admin.

  7. In step 6, IE will indicate that "This website wants to install the following add-on: GSViewerX.cab from Grandstream Networks Inc.", allow the installation.

  8. Firefox user need to download and install the plug-in to see the video, the plug-in is here: http://www.grandstream.com/sites/default/files/Resources/GSurf_Pro_V2_1.0.3.13.zip

NOTE:

➢ Please temporarily disable Antivirus or Internet Security Software when download and install the Grandstream Firefox plug-in for video or "GSViewerX.cab" for Microsoft Internet Explorer.

GXV3674\_HD/FHD\_VF v2 APPLICATION SCENARIOS

GXV3674_HD/FHD_VF v2 is very versatile infrared IP Camera, it can be used in a lot of scenarios.

LAN w/o Internet

For multi-room or a bigger space, multiple GXV3674_HD/FHD_VF v2 might be required. User can establish a local area network using PoE switch.

If remote access required, a router with internet access may add in.

Equipment List:

1) Several GXV3674_HD/FHD_VF v2
2) Ethernet cables
3) Switch (Static IP required to configure to IP Cameras)
4) PoE Switch (Optional, better solution)

If remote access to the cameras required to view the LIVE video stream, then broadband Internet is required and more equipment required:

5) Router (if DHCP configured than static IP is not required although still recommended)
6) Broadband Internet Access (FiOS, Cable or DSL)
7) iPhone or Android phone. (Application like "IP Cam Viewer")

GRANDSTREAM GXV3674_HD - Equipment List: - 1

natural_image Isometric view of a smart security camera system with multiple cameras and sensors in a room (no text or labels visible)

Figure 5-1: GXV3674_HD/FHD_VF v2 Working in LAN

LAN with Internet

For multi-room or a bigger space, with Internet access and local video recording required, following list is recommended:

Equipment List:

1) Several GXV3674_HD/FHD_VF v2
2) GVR3550 NVR
3) Ethernet cables
4) Switch (PoE Switch recommended)
5) Router
6) Broadband Internet Access (FiOS, Cable or DSL)
7) iPhone or Android phone. (Application like "IP Cam Viewer")
8) GSurf_Pro Remote Access (Optional)

GRANDSTREAM GXV3674_HD - Equipment List: - 1

natural_image Isometric view of a retail store interior with security camera and product displays (no text or symbols visible)

Figure 5-2: GXV3674_HD/FHD_VF v2 Working with GVR3550 and/or GSurf_Pro with Internet

Below is the illustration of GXV3674_HD/FHD_VF v2 peripheral connections for related application.

GRANDSTREAM GXV3674_HD - Equipment List: - 2

flowchart
graph TD
    A["GNV3500 DETRUM"] -->|Audio_Out| B["Ceiling Speaker"]
    A -->|Audio_In| C["External Microphone"]
    A --> D["Remote Peering"]
    D --> E["GXV3500 Decoder"]
    D --> F["Sirens"]
    D --> G["Two-way Audio & Video via Network"]
    G --> H["Grandstream Video Phone"]

Figure 6: Application Peripheral Connection for GXV3674_HD/FHD_VF v2

NOTE:

➢ Audio Output (Amplified Speaker) using 3.5mm interface and must match below impedance parameter:

Audio Input3.5mm Line-In, 1500Ω, 0.1Vrms ~ 0.707Vrms
Audio Output3.5mm Line-Out, 600Ω, 0.707Vrms

Grandstream Video Phone can work with GXV3674_HD/FHD_VF v2 via either Peer IP (LAN) or SIP extension (WAN). Peer to Peer (or Direct IP) works only at LAN using static IP; SIP extension requires related SIP server/proxy provided and configured.

This page intentionally left blank

GXV3674\_HD/FHD\_VF v2 HOME WEB PAGE

The Home Page of GXV3674_HD/FHD_VF v2:

WSP201.2 13-J BRIGHTNESS 0 CONTRAST 16 SATURATION 99 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Figure 7: Home Page of GXV3674_HD/FHD_VF v2

  1. Real Size/Window Size icon:

  2. ZOOM:

  3. BRIGHTNESS bar:

  4. CONTRAST bar:

  5. SATURATION bar:

  6. Language icon

  7. Configuration icon:

  8. Default Video Parameter icon:

  9. Stop/Play Video icon:

  10. Capture (Snapshot) icon

  11. Record icon:

  12. Listen On/Off icon:

  13. Talk On/Off icon:

  14. Playback:

  15. Local Configuration:

  16. Motion Detection Alarm Indicator:

Click to switch between real resolution size and embedded window size video.

Zoom in or Zoom out during ePTZ operation (Default Not Applicable).

Adjust the image or video brightness.

Adjust the image or video contrast.

Adjust the image or video saturation.

Click to switch webpage language.

(Current support: Chinese, English and Russian)

Click to enter "Configuration Page" to configure the parameters of

GXV3674_HD/FHD_VF (Administration privilege required).

Click to reset video parameters (Brightness, Contrast, Saturation) to default.

Click to Stop and Play the embedded live video.

Click to capture and save a snapshot of current displayed video frame.

Default directory: C:\Capture, using date stamp as folder name.

Click to Start/Stop record of current video stream into a file.

Default directory: C:\Record

Toggle to listen/stop audio from the camera's microphone

Toggle to talk to camera's speaker (computer microphone required)

Click to playback the recorded video file.

Click to configure the file path of snapshot and recorded video files.

Also adjust the video delay or smoothness.

If (configured) motion detection alarm triggered, the indicator will flash in red.

Click the indicator icon to turn off the alarm indication.

GXV3674\_HD/FHD\_VF v2 Configuration & Language Page

  • When click the "Configuration" tab, web page will link to page to configure the related parameters of the GXV3674 HD/FHD VF.
  • There are two big categories of settings: Basic Settings and Advanced Settings. Details will be illustrated in the later Chapter.
  • When click the "Language" tab, supported languages will be displayed in Figure 2. Click to select the related webpage display language.

Configuration 简体中文 ■ English Русский

Figure 8: Web Language Switch

• Currently firmware only support: English (default), Simplified Chinese and Russian.

BASIC SETTINGS EXPLANATION

System Settings Page

This page allow user to configure the system settings of GXV3674_HD/FHD_VF v2.

GXV3674_FHD_VF Administration Interface Set the System Time Current System Time: 2015-02-04 22:15:03 Sync With PC Set Manually Time Zone: GMT-05 (New York, Toronto, Washington DC) Enable Daylight Saving Time Start Time: Mar Second Sunday 2 Hour End Time: Nov First Sunday 2 Hour Enable NTP NTP Server: time.nist.gov Update Interval(Minutes): 60 (5-1440) Save Device Setting Device Name: GXV3674_FHD_VF Save

Figure 9: System Settings Page

• Current System Time:

○ Sync with PC:
- Set Manually:

- Time Zone:

○ Enable DST:
○ NTP:

• Device Name:

Display time current system is running at

Click to synchronize current time with computer.

Click to manually set the current time and date.

Select from pull down menu the time zone unit located

Configure Day Light Saving Time

Enable and configure NTP server and update interval.

Set the name of the camera which will be shown in the result of "Search Tool" of GSurf_Pro VMS program.

NOTE:

Save button has to be clicked to save all the changes made to the device.

This page allows user to configure the video and audio related settings.

Home Basic Settings System Video & Audio OSD CMOS Settings Networking DDNS SIP Status Advanced Settings Video Settings Primary Stream Settings Preferred Video Codec: H264 Profile: Main Profile Resolution: 1920*1080 (16:9) Bit Rate: 4096 kbps Maximum Frame Rate: 30 fps Bit Rate Control: CBR C VBR I-frame Interval: 80 Frame(1-100) Secondary Stream Settings Preferred Video Codec: H264 Profile: Baseline Resolution: 640*480 (4:3) Bit Rate: 512 kbps Maximum Frame Rate: 15 fps Bit Rate Control: CBR C VBR I-frame Interval: 80 Frame(1-100)

Figure 10-1: Video & Audio Settings Page

Video Settings

• Primary Stream Settings:

o Preferred Video Codec: MJPEG and H.264 supported, H.264 recommended.
Profile: H.264 profile selection. Default is "Main Profile."
o Resolution: The resolution in pixels used at video image
- Bit Rate: video bit rate or bandwidth used
o Maximum Frame Rate: Maximum frame rate used (more data if big frame used)
- Bit Rate Control: Constantly bit rate, or variable bit rate
○ Image Quality: Image quality used when Variable Bit Rate used
○ I-frame Interval: I-frame interval (suggested 2\~3 times of frame rate)

• Secondary Stream Settings: Same as primary stream.

NOTE:

H.264 suggested if camera needs to be viewed via Internet.
The definition of Baseline, Main Profile and High profile of H.264 please refer to: http://en.wikipedia.org/wiki/H.264/MPEG-4_AVC
If MJPEG selected, reduce max. frame rate to min. value to save bandwidth and get better image
Grandstream IP Camera provides two video streams, user can use them with flexibility. For example, the high-resolution stream for local recording; another low or high resolution for remote monitoring; or vice versa depending application scenarios.
Use below link to calculate bandwidth and storage before installation http://www.grandstream.com/support/tools/bandwidth-storage-calc

Audio Settings Preferred Audio Codec: PCMU Microphone Volume: 3 Speaker Volume: 25 Light Condition Light Condition: Outdoor Indoor (50Hz Power Frequency) Indoor (60Hz Power Frequency) Save

Figure 10-2: Video & Audio Settings Page

- Audio Settings:

o Preferred Audio Codec:

PCMU, PCMA supported. Audio also can be disabled.

○ Microphone Volume:

Slide to adjust microphone gain.

o Speaker Volume:

Slide to adjust the speaker volume connected.

• Light Condition:

Select correct light condition for the scene monitored: Outdoor, Indoor 50Hz power frequency (Europe, China, etc.) or 60Hz power frequency (US, Japan, etc.). Wrong setting will affect image quality under fluorescence light condition.

OSD Setting Page

Home Basic Settings System Video & Audio OSD CMOS Settings Networking DDNS SIP Status Advanced Settings On Screen Display(OSD) OSD Text: FrontDoor OSD Position: Bottom OSD Date Format: MM/DD/YYYY Display Time: ✓ Display Text: ✓ Save

Figure 11: OSD Settings Page

• On Screen Display (OSD):

  • OSD Text:
  • OSD Position:
  • OSD Date Format:
    o Display Time:
    ○ Display Text:

Display time stamp and text on the video screen.

Inputted text (to identify the camera) shown on the screen.

Show the OSD in either top or bottom position on screen.

OSD Date format, choose based on user preference.

When checked, time will be displayed inside the video image

When checked, inputted text will display on video image

This page allows user to adjust the CMOS parameters:

Home Basic Settings System Video & Audio OSD CMOS Settings Networking DDNS SIP Status Advanced Settings CMOS Parameters Configuration Flip: NONE Shutter Speed: Auto IR LED Setting: Auto IR CUT Setting: Automatic(IR sensor control) IR CUT Sensitivity: 3 Color Mode: Auto WDR: Off Save

Figure 12: CMOS Settings Page

  • Flip: Pull down to choose video flip, either vertically or horizontal or both.
  • Shutter Speed: Camera Shutter Speed. There are 10 options, with Auto, 1/30 (slowest), 1/60, 1/125, 1/250, 1/500, 1/1000, 1/2000, 1/5000 and 1/10000 (fastest)
  • IR LED Setting: Auto, or manually turn ON or turn OFF the LED light. Default Auto Manually On/Off LED light applied to save power if camera powered by battery.
  • IR CUT Setting: Manual, Automatic (IR Sensor control) or Time Schedule Mode (configurable Daytime Schedule for user's flexibility) to switch the mechanical IR_CUT.
    • IR CUT Sensitivity: Sensitivity of IR Sensor to trigger the IR CUT; 5 levels total and 5 highest sensitivity.
    • Color Mode: Camera Color Mode. There are three options: Color, Black/White, Auto (Default).
    • WDR Digital WDR or eWDR, On/Off switch, default is Off. (FHD Models Only)

NOTE:

➢ Auto option recommended for Shutter Speed, IR CUT Setting and Color Mode.
WDR feature has to be used where appropriate: It has been developed specifically for scenarios with simultaneously light and dark areas in the field or vision, not for solely low light scenes or bright light scenes.
You should first consider where and what you want to monitor and to what level of detail and consider the lighting conditions present, because this will effect where you should place the camera for the best results
If the camera also needs to operate at night, it may be beneficial to disable the WDR function (if there is no high contrasting light) in order to maximize the camera's low light performance

Networking Setting Page

This page allows user to configure network related parameters:

IP Address Configuration

○ Dynamically Assigned via DHCP
- Statically Configured as:

IP Address:

192.168.1.68

Subnet Mask:

255.255.255.0

Default Gateway:

192.168.1.1

DNS Configuration

Obtain DNS Server Address Automatically
© Use the Following DNS Server Address:

Primary DNS Server:

64.119.143.2

Secondary DNS Server:

71.243.0.12

HTTP

HTTP Port:

8088

Save

Figure 13: Networking Setting Page

• IP Address Configuration:

o Dynamically Associated via DHCP:
o Statically Configured as:

• DNS Configuration:

- HTTP:

Camera IP address configuration

Default setting, DHCP server assign IP to camera.

Static IP address configuration

DNS server IP. Must be configured if using static IP.

Web access TCP port, default 80.

NOTE:

If camera behind SOHO router with port forwarding configuration for remote access, static IP or static DHCP has to be used to avoid IP address change after router reboot.
TCP port above 5000 suggested if Port Forward HTTP for remote access, due to some ISP would block port 80 for inbound traffic. For example, change the default HTTP port from 80 to 8088, to make sure the TCP port not likely blocked.
In addition to HTTP port, RTSP port is also required to configure via port forward, so remote party can view the video stream.
If revise the default TCP port 80 to port "A", then RTSP port should be "2000+A" (changed from default TCP 554). Both TCP port "A" and "2000+A" should be configured for port forwarding in the router. For example, the HTTP port changed to 8088, the RTSP port now should be 10088, both TCP ports 8088 and 10088 should be configured for port forwarding in order for remote camera access: 8088 for web portal, 10088 for video streaming.

DDNS Settings Page

This page allows user to configure dynamic DNS related parameters:

GXV3674_FHD_VE Administration Interface Dynamic DNS Settings DDNS Active: DDNS ISP Type: dyndns.org Self-Define DDNS Address: Site Name: DDNS Account: DDNS Password: ••••••• STUN Server: Save

Figure 14: DDNS Setting Page

  • DDNS Active: Enable DDNS by check this field.
  • DDNS ISP Type: Select the DDSN service provider from the pull-down menu list
    • Self-Define DDNS Address: Input the self-defined DDNS address
  • Site Name: DDNS site name
    • DDNS Account: DDNS account name
    • DDNS Password: DDNS password
  • STUN Server: Stun server FQDN or IP. If device behind a non-symmetric router, STUN server can help to penetrate & resolve NAT issue.

GXV3674_HD/FHD_VF v2 can be configured as SIP endpoint to call out when alarm triggered; or allow permitted number to call in to check the video if Grandstream video IP phone is used.

Home Basic Settings System Video & Audio CMOS Settings Networking DDNS SIP Status Advanced Settings General Phone Settings Registered: Offline Unregister On Reboot: SIP Settings Account Name: IPPBX SIP Server: gs_ucm.isp.com Outbound Proxy: SIP User ID: 6175669300 Authenticate ID: 0039665716 Authenticate Password: ••••••• STUN Server: mystun.freebox.net Stream: Secondary Preferred Vocoder: PCMU Register Expiration(Second): 3600 Local SIP Port: 5060 Local RTP Port: 5004

Figure 15-1: SIP Setting Page

  • Registered: SIP registration status. Display "Online" in Green, "Offline" in Red.
  • Unregistered on Reboot: If checked and SIP server support, reboot camera will unbind all registered end points using this SIP account.
    • Account Name: SIP account name used for self-identification.
  • SIP Server: FQDN or IP of SIP server from VoIP service provider
  • Outbound Proxy: IP or FQDN of Outbound proxy server, helps penetrate NAT/Firewall
  • SIP User ID: SIP username, or telephone number from ITSP
    • Authenticate ID: Authenticate ID used by SIP proxy
  • TEL URI: URI or Phone selection by ITSP, see webpage help tips “ ”
    • Authenticate Password: Authenticate password used by SIP proxy
    • STUN Server: STUN server used to resolve NAT if have
  • Steam: Which stream used for SIP call. Default 2^nd stream, strongly recommended due to bandwidth and data involved at video call.
    • Preferred Vocoder: Audio codec used for SIP call, only G.711 A or U supported.
  • Registration Expiration: Registration expiration time, default 3600 seconds
  • Local SIP Port: Local SIP port, default 5060
  • Local RTP Port: Local RTP port for media, default 5004

Auto On-Hook Timer: 300 Disable Audio in SIP Call: Enable Keep Alive Accept Direct IP Call: Enable White List Number Filter: Enable two-way Audio Warning Mode: SIP Proxy Compatibility Mode: SIP Transport: UDP TCP TLS/TCP SIP TLS Certificate: Delete SIP TLS Private Key: Delete SIP TLS Private Key Password: ••••••• Self-defined Warning Audio: Upload Delete Save

Figure 15-2: SIP Setting Page

• Auto On-Hook Timer:
• Disable Audio in SIP Call:
- Enable Keep Alive:
• Accept Direct IP Call:
- Enable White List Number Filter:
• Enable two-way Audio Warning:
• SIP Proxy Compatibility Mode:
- SIP Transport:
- SIP TLS Certificate:
• SIP TLS Private Key:
• SIP TLS Private Key Password:
• Self-define Warning Audio:

Timer (seconds) for automatic disconnecting the call. Default 300.

Disable or turn off audio of camera when SIP call established.

Checked to help NAT resolution, sending alive packets.

Check to accept peer-to-peer IP call in LAN w/o SIP server.

Check to allow only white list number to call in, for security.

Check to enable two-way audio when call established (Default)

Check to enable more proxy compatibility with cost of bandwidth, the SIP call will send both audio and video no matter what.

SIP transport protocol, UDP as default.

Copy/Paste the TLS certificate here for encryption.

Input private key here for TLS security protection.

The password for SIP TLS private Key.

Upload self-defined alarm warning message audio.

(Format: G.711 .WAV format, File Size <= 300KB, Linear PCM, 8KHz Sampling Rate, 16bit, Single Channel)

Phone List for Alarm Out Phone Number Remark Name 6179114110 Local Police Add... White List (Allowed Caller) Phone Number 6175669300 Add...

Figure 15-3: SIP Setting Page

• Phone List for Alarm Out):

Callee or call receiver's number when alarm call triggered.

• White List (Allowed Caller):

Phone numbers allowed calling into the camera.

NOTE:

GXV3674_HD/FHD_VF v2 requires external microphone and amplified speakers connected to support audio calls

This page shows the GXV3674_HD/FHD_VF v2 operation status:

GXV3674_FHD_VF Administration Interface System Statistics Product Model: GXV3674_FHD_VF Hardware Version: V1.0A Part Number: 9670005410A Bootloader Version: 1.0.3.6 Core Version: 1.0.3.6 Base Version: 1.0.3.6 Firmware Version: 1.0.3.6 System Up Time Since: 5 days 12 hours 18 minutes Network Status MAC Address: 00:0B:82:58:22:2C LAN IP Address: 50.241.102.228 LAN Subnet Mask: 255.255.255.240 LAN Default Gateway: 50.241.102.238 DDNS Status: Disabled SIP Registered: Offline IR CUT Status IR CUT Status: Night

Figure 16: Status Page

NOTE:

➢ IR CUT Status showed Daytime or Night
When SIP account registered, the status will display "Online" in Green.
When SIP account unregistered, the status will display "Offline" in Red, as below.

SIP Registered:

Offline

ADVANCED SETTINGS EXPLANATION

User Management Page

This page allows user to do user management:

GXV3674_FHD_VE Administration Interface Home Basic Settings Advanced Settings User Management Maintenance SMTP FTP Privacy Masks Alarm Server Time Lapse Photography Motion Detection Syslog Manage User Existing User Name: --Add New User-- User Name: User Password: 0 Add Confirm User Password: Update Privilege: Administrator Delete Administrator Viewer Manage Anonymous Viewing Allow Anonymous Viewing: ✓ Save

Figure 17: User Management Page

  • Existing User Name: Allow revise existing user or add new user
  • User Name: The name of user need to be revised
  • User Password: New password if revise password
  • Confirm User Password: Re-enter the new password for verification
    • Privilege: Choose user privilege

- Allow Anonymous Viewing: When checked, no security enhanced. Any person can view the camera if knowing the IP or FQDN of the camera, but can NOT

change anything, just view ONLY.

Maintenance Page

This page allows user to maintain the camera:

Home Basic Settings Advanced Settings User Management Maintenance SMTP FTP Privacy Masks Alarm Server Time Lapse Photography Motion Detection Syslog Restart the Device Restart the Device. Restart Restore the Device Reset Settings, except IP Address, to Factory Default. Restore Firmware Upgrade and Provisioning Upgrade via: HTTP Firmware Server Path: firmware.grandstream.com Config Server Path: config.grandstream.com XML Config File Password: ••••••• Automatic Upgrade Interval(Minutes): 10080 DHCP Option 66 Override Server: □ ① 3CX Auto Provision: □ ① Automatic Upgrade: ✓ Save System Access Disable Telnet: ✓ Enable UPnP Discovery: ✓ Save

Figure 18: Maintenance Page

  • Restart: When clicked, the camera will reboot or restart (soft reboot).
  • Restore: When clicked, the camera will be reset to factory default, wiping out all the configurations (except IP address)
  • Upgrade via: Upgrade firmware via TFTP, HTTP or HTTPS
  • Firmware Server Path: Server path holding the firmware
  • Config Server Path: Server path holding the configuration file (auto provisioning)
    • XML Config File Password:
    Password for encrypt the XML based configuration file
    • Automatic Upgrade Interval (Minutes):
    Time interval for automatic upgrade, default 10080
    • DHCP Option 66 Override Server:
    Enabled to redirect firmware/configuration server path.
    • 3CX Auto Provision: Enabled to use 3CX as SIP server to auto provisioning the device.
    • Automatic Upgrade: Checked to enable automatic firmware upgrade and provisioning.

System Access

  • Disable Telnet: Check to disable Telnet to enhance security.
  • Enable UPnP Discovery: Used for UPnP automatic discovery of the device in related network environment. Default enabled.

NOTE:

Only XML based automatic provisioning is supported by GXV3674_HD/FHD_VF v2.

This page intentionally left blank

This page allows user to configure email client to send out email when alarm triggered:

Home Basic Settings Advanced Settings User Management Maintenance SMTP FTP Privacy Masks Alarm Server Time Lapse Photography Motion Detection Syslog SMTP Server Settings Enable SMTP: ✓ SMTP Server: smtp.gmail.com SMTP Server Port: 465 From E-Mail address: my_id@gmail.com To E-Mail address 1: other@email.com To E-Mail address 2: 6179116110@verizon.net To E-Mail address 3: work@abc_corp.com User Name: my_id Password: •••••• SSL: ✓ Email Subject: FrontDoor Motion Detected Email Content: There is something happening at front door. Please check out immediately. http://IPCam.myDDNS.org:10020 OR http://IPCam.myDDNS.org:10020/snapshot /view4.jpg (Port Mapped via Router) 1 Required Fields. 2 Valid DNS server is required for hostname. Save Test

Figure 19-1: SMTP Setting Page

  • Enable SMTP: When checked, email client is enabled.
  • SMTP Server: SMTP Email Server IP or Domain Name
  • SMTP Server Port: Port number used by server to send email
    • From Email address: The email address of alarm email sending from, usually client email ID
    • To E-Mail address: The email address to receive the alarmed email, total 3 included.
  • User Name: Email client User ID
  • Password: Email client password
  • SSL: Check if the SMTP email server requires SSL
  • Email Subject: Customizable email subject for user convenience
  • Email Content: Customizable email body for user convenience

Home Basic Settings Advanced Settings User Management Test successful! Enable SMTP: ✓ SMTP Server: smtp.gmail.com SMTP Server Port: 465

Figure 19-2: SMTP Setting Page

NOTE:

Click "Save" to save the email configuration information.
Click "Test" after configuration, if setting is correct, a test email will send out and "Test successful!" orange bar will display like below

FTP Settings Page (Upload Alarm)

This page allows user to configure FTP parameters to upload the alarm or video recording:

FTP Settings Enable FTP: ✓ FTP Server: myftp.cloud.net FTP Server Port: 21 User Name: subscriber12 Password: ••••••• Path: \AlarmRecording Valid DNS server is required for hostname. Save Test

Figure 20: FTP Setting Page

  • Enable FTP: When checked, built-in FTP client is enabled.
  • FTP Server: IP or Domain name of FTP site or server
  • FTP Server Port: TCP port for FTP server, default port number 21
  • User Name: FTP server User ID
  • Password: FTP server user password
    • Path: Path in the server where upload files are stored.

NOTE:

➢ Click “Save” to save the FTP configuration information.
Click "Test" after configuration, if setting is correct, a test FTP operation will be performed and "Test successful!" yellow bar will display if the operation is successful.

Test successful!

Privacy Masks

This page allows user to configure privacy masks up to 4 different regions.

Home Basic Settings Advanced Settings User Management Maintenance SMTP FTP Privacy Masks Alarm Server Time Lapse Photography Motion Detection Syslog Privacy Masks 0/36766 D: D:\5.33 1 Region ID Enable 0 ✓ 1 ✓ 2 ✓ 3 ✓ Save

Figure 21: Privacy Masks Configuration Page

Select different region requiring privacy mask, configure and save the configuration.

When privacy mask enabled, the video at related region will be masked by black color and no video displayed inside that mask.

Alarm Server Settings Page (Upload Alarm to supported VMS or HTTP Server)

This page allows user to configure alarm HTTP server to upload alarms (Upload Alarms to VMS platform supported or HTTP Server for processing):

Home Basic Settings Advanced Settings User Management Maintenance SMTP FTP Privacy Masks Alarm Server Time Lapse Photography Alarm HTTP Server Settings Server Name: Security_Solution URL: server911.cloud.net.9999 User Name: subscriber_110 Password: ************ Save

Figure 22: Alarm HTTP Server Setting Page

• Server Name: The name of HTTP server or VMS system
- URL: URL of the Server
- User Name: User ID from that Server
- Password: Password for that User ID

NOTE:

Grandstream provide HTTP API to help third party companies by using HTTP server or VMS to develop further solutions for their customers.
http://www.grandstream.com/products/surveillance/general/documents/grandstream_http_api.pdf

Grandstream IP Camera and DVS (including GXV3674_HD/FHD_VF v2) are ONVIF certified.

Time Lapse Photography

This page allows user to configure Time Lapse Photography (or period snapshot).

Home Basic Settings Advanced Settings User Management Maintenance SMTP FTP Privacy Masks Alarm Server Time Lapse Photography Time Lapse Photography Settings Enable Time Lapse Photography: Trigger Every Other 1 minutes FTP Upload SMTP Upload Save

Figure 23: Time Lapse Photography Configuration Page

  • Enable Time Lapse Photography:
    Check to enable this feature. User can configure the timer or duration of the triggering moment, minimum value is 1 minute.
  • FTP Upload: Enabled will allow device to upload the snapshots to FTP server. The FTP server is configured at "FTP" server page illustrate before.
  • SMTP Upload: Enabled will allow device to email the snapshots via email server. The email server is configured at "SMTP" configuration page.

Click "Save" button to save the changes made and the feature will take effect immediately.

Motion Detection Configuration Page (Set Alarm)

This page allows user to configure motion detection to trigger alarms:

Motion Detection Settings Motion detection will be disabled if both primary and secondary codec are set to MJPEG Show Regions Enable Motion Detection 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Region ID Sensitivity 0 50 1 50 2 50 3 50 4 50 5 50 6 50 7 50 8 50 9 50 10 50 11 50 12 50 13 50 14 50 15 50 Auto Minimum duration required by motion detection trigger(s) 3 Minimum interval of different motion detection event(s)

Figure 24-1: Motion Detection Configuration Page

  • Show Regions: When checked, Motion Detection region with number will be displayed as a white rectangle in the screen. When "Edit" clicked,
    the Rectangle will become Red, as shown in Figure 16-1.
  • Enable Motion Detection: When checked, Motion Detection is enabled. There are total 16 regions be available for MD configuration, from region 0 to 15. Select and highlight the number of region to configure the MD and the sensitivity.
  • Minimum duration required by motion detection trigger(s): Min. period (in second) to identify as a valid MD event. Default is Auto, max. value is 5 second. The setting helps to reduce false alarm based on user's scenarios.
  • Minimum interval of different motion detection event(s): Min. time frame (in second) to identify as different MD events if there are constant motions. Max. value is 60 seconds or 1 minute. This setting helps accuracy of MD triggered recording.

Alarm Action ✓ Record Video From Pre Alarm Up to 10 seconds to After Alarm Up to 15 seconds ✓ Voice Alarm to SIP Phone ✓ Upload to Alarm Center □ Upload to Alarm HTTP Server □ Record Video and Upload to FTP Server ✓ Email and FTP upload JPEG Pre Alarm Up to 1 seconds to After Alarm Up to 1 seconds Save Time Schedule Config

Figure 24-2: Motion Detection Configuration Page

Alarm Action:

• Record Video From Pre Alarm Up to XXX seconds to After Alarm Up to XXX seconds:
This setting to allow configure pre/post alarm video for applications to utilize. MJPEG is NOT supported for this feature.
• Voice Alarm to SIP Phone: If SIP server or peer IP device configured, check this will allow MD event to trigger alarm SIP call to pre-configured number.
- Alarm Output: Select will allow MD to send alarm to Alarm Output interface.
- Upload to Alarm Center: When checked, the alarm video will be transferred to Alarm Center, like Grandstream free GSurf_Pro VMS software. When peering with GXV3500 Decoder for Remote Alarm_Out, this field has to be selected.
- Upload to Alarm Center: When checked MD alarm will be sent to 3^rd party Alarm Center.
- Upload to Alarm HTTP Server: When checked MD alarm will be send to 3^rd path HTTP server via Grandstream HTTP API.
• Record Video and Upload to FTP Server:
When checked and FTP server configured, the recorded video will be send to the configured FTP server.
- Email and FTP upload JPEG:

When checked, snapshots of trigger moment will be emailed to pre-configured email account and also uploaded to FTP server if configured. The pre/post alarm snapshot numbers can be configured based on time (in second) to meet user's requirement.

Time Schedule Config:

Click the "Time Schedule Config" will bring up following interface to allow user to configure the Time Schedule for the Motion Detection to take action.

Motion Detection Time Schedule 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Sun Mon Tue Wed Thu Fri Sat Date Start Time End Time Check All Everyday 00:00 23:59 Everyday 00:00 23:59 Add successful! Everyday 00:00 23:59 Add Delete Cancel

Figure 24-3: Motion Detection Schedule Configuration Page

- As shown in Figure 15-2, user can configure the Motion Detection Region with related Start and Stop time to control the motion detection operation.

NOTE:

User has to configure the "Time Schedule"; otherwise the Motion Detection Alarm will not work if there is no time schedule configured.
Grandstream free GSurf_Pro VMS software can be downloaded from: http://www.grandstream.com/products/tools/surveillance/gsurf_pro.zip

This page intentionally left blank

Remote Alarm\_Out peering with GXV3500 Decoder

The GXV3674 series IP camera does not have built-in Alarm_In interface, but when peering with Grandstream GXV3500 encoder/decoder, the GXV3500's built-in Alarm_Out interface (running at decoder mode) can behave as remote Alarm_Out of GXV3674 series IP Camera.

The benefit of such peering is the Alarm_Out circuit is not physically wired into the IP Camera anymore, with the Ethernet network behaving as wiring, the Alarm_Out circuit can now be located to convenient places where GXV3500 located. This means IP Camera can be in location A, while the Alarm_Out can be in location B (A and B can be in the same or different places as long as A and B can reach each other via network/internet). This will help a lot of users to monitor site remotely and take appropriate action, because there are situations where location A with cameras but actions have to be taken from location B. With Grandstream's solution, traditional A and B limitation by the cable length is now disappear.

The configuration of such remote Alarm_Out is very simple:

GXV3674 Side:

Same configuration as previous Motion Detection configuration, just make sure "Upload to Alarm Center" checked and selected:

Alarm Action Record Video From Pre Alarm Up to 10 seconds to After Alarm Up to 30 seconds Voice Alarm to SIP Phone Upload to Alarm Center Upload to Alarm HTTP Server Record Video and Upload to FTP Server Email and FTP upload JPEG Pre Alarm Up to 1 seconds to After Alarm Up to 0 seconds Save Time Schedule Config

Figure 24-4: Remote Alarm_Out IP Camera Configuration

GXV3500 (Decode Mode) Side:

GXV3500 has to be running as Decode when functioning as remote Alarm_Out of the peering IP Camera. The configuration is as below:

1) Input the 2^nd stream (H.264 used) as the RTSP URL, with correct credentials, as below.
2) Only ONE stream (currently decoding stream) the Motion Detection can use the GXV3500 built-in Alarm Out interface if there are multiple RTSP URL configured in the GXV3500.

GXV3500 Decode Mode Administration Interface 02/04/2018 Mold 19:29:04 G20361RPR_05 rtsp://192.168.11.69:10020/4 Stop Encode Home Page | Configuration | Language Decoder Settings Stream Format: RTSP Default Stream: 2 Enable Patrol: Video Output Type: Auto or NTSC Real Size: Save Start Patrol No. Patrol RTSP URL User Name Password Description Time(s) 1 ▶ rtsp://192.168.11.69:10020/4 admin ••••••••••••••••••••••••••••••••••••••••••••••••••• 2 ▶ rtsp://192.168.11.71:10060/4 admin •••••••••••••••••••••••••• 3 ▶ 60

Figure 24-5: Remote Alarm_Out peering GXV3500 Configuration

NOTE:

GXV3500 is designed to work with analogue camera, therefore resolution more than D1 NOT supported, this is why 2^nd stream decoding (usually less than D1) used as peering for remote Alarm_Out. The RSTP setting will be: rtsp://IPCamera:Port/4 (4 is 2^nd stream of GXV3674)
➢ 2^nd stream also consume less bandwidth therefore good for internet transmission.
H.264 video codec has to be selected because Motion Detection not supported via MJPEG.
All Grandstream IP Cameras without built-in Alarm_Out interface can peer with GXV3500 (Decoder Mode) built-in Alarm_Out interface for Motion Detection Remote Alarm_Out.

Alarm_Out duration can be configured at "System" setting page of GXV3500 Decoder. See below the figure. When Alarm_Out taking action, the webpage will show the related action.

For example, below the “Digital Output Duration” is selected as “15 seconds” so the Alarm_Out will act for 15 seconds before revert back to previous state. In below case, the default is circuit “Open”, when Motion Detection alarm triggered, the circuit state changed to “Close”, as illustrated below for 15 seconds and then switch back to previous “Open” state.

GXV3500 Decode Mode Administration Interface Home Basic Settings System Networking DDNS SIP Status Advanced Settings Set the System Time Current System Time: 2015-02-04 16:28:25 Sync With PC Set Manually Time Zone: GMT-05 (New York, Toronto, Washington DC) Enable Daylight Saving Time Start Time: Mar Second Sunday 2 Hour End Time: Nov First Sunday 2 Hour Enable NTP NTP Server: time.nist.gov NTP Update Interval(Minutes): 60 (5-1440) Save OSD Date Format OSD Date Format: YYYY-MM-DD Save DI and DO Digital input: Normal Open ; Current state is Open Digital output: Normal Open ; Current state is Close Alarm Output Duration: 15 seconds Save

Figure 24-6: Remote Alarm_Out peering GXV3500 Action Output Display

Unlike the Alarm_Out interface of Grandstream IP Camera (which using relay switch), the GXV3500 Alarm_Out is using photo coupler circuit. If connecting to a multi-meter, you will see the Ohm changed from unlimited to several hundred Ohms depending on GXV3500 HW version.

4 3 1 OUT+ 2 OUT- Photocoupler Alarm out AV_OUT OUT ALARM RS485 FLUKE 115 TRUE RMS MULTIMETER 0L M Ω 0 Auto 6 AV_OUT ALARM RS485 FLUKE 115 TRUE RMS MULTIMETER 24 1.5 Ω 0 Auto 6 (10)

Figure 24-7: Peering GXV3500 Decoder Alarm_Out Circuit

This page intentionally left blank

Configure SIP Open Door peering with GVR355X NVR

The metal case outdoor IP66 weatherproof IP cameras GXV3674 series do not have built-in Alarm_In and Alarm_Out interface. But when combined with Grandstream GVR355X, SIP Proxy or IP-PBX, the GVR355X's built-in Alarm_In and Alarm_Out interface can be used to connect to related 3^rd party device like Door Bell/Intercom and Relay or Door Strike, to accomplish the SIP Open Door function when configured with related SIP IP-PBX.

The benefit of such solution is that the GVR355X can only record all the person pressed the door bell and door can be controlled (local or remotely) via video SIP calls, either via Grandstream IP video hard phone like GXV3240 or GXV3275, or Grandstream GS_Wave soft phone (pending) running on Android or iOS.

GXV3674 (IP Camera) Side:

• Basic - SIP Setting:

Home Basic Settings System Video & Audio OSD CMOS Settings Networking DDNS SIP Status Advanced Settings General Phone Settings Registered: Online Unregister On Reboot: SIP Settings Account Name: Test SIP Proxy SIP Server: domain_or_IP.yoursipserver Outbound Proxy: SIP User ID: 809 Authenticate ID: 809 TEL URI: Disabled User=phone Enabled Authenticate Password: ••••••• STUN Server: Stream: Secondary

IP Camera Basic Settings – SIP Configuration

Make sure configure correct SIP Proxy or IP-PBX by using either FQDN domain name or IP address. Also fill in extension and password, save the setting and make sure the IP camera is registered to the SIP server, as shown in Figure 1, the green "Online" status will be displayed once the IP camera registered to the SIP Proxy or IP-PBX.

At the "Phone List for Alarm Out", please fill in the extension of the IP video phone to receive the Alarm_Out calls, this could be Grandstream SIP video hard phone or software phone. Make sure the video phone is indeed registered to the SIP Server or IP-PBX.

Phone List for Alarm Out

Phone Number

806

Remark Name

IP Video Phone|

Add...

White List (Allowed Caller)

Phone Number

Add...

Once click "Add", the phone number will be added as shown in below:

Phone List for Alarm Out

Phone Number

Remark Name

806

IP Video Phone

□ Check All

Add..

Remove

In this example configuration, the IP camera with extension number 809, once Alarm_In (sending from GVR355X via the Door Bell Operation) triggered, will make SIP phone call to extension 806, the IP Video Phone configured to receive the Alarm_Out call to execute the open door operation. The IP video phone could be Grandstream GXV3240/3275 hard phone, or GS_Wave soft phone running at Smartphone, like Android or iOS (Pending).

This finished the SIP related configuration on IP Camera side.

NOTE:

Make sure to DISABLE the Voicemail or Faxmail at SIP Proxy or IP-PBX side for the extension that receiving the Alarm_Out call. (Extension 806 in the example).

GVR355X (NVR) Side:

GVR355X has to configure the "IO Alarm Config" correctly to allow the "SIP Open Door" feature function properly.

- Software Configuration

GVR355X can be configured either via Local View interface or WebGUI interface.

Below example is using web interface of GVR3552, the GVR3550 is similar:

Camera Management Schedule Alarm Config - IO Alarm Config - Abnormal Alarm Config Network Settings System Settings Input Port : 1 Use port as : Port Input Alarm Open Door Request Alarm Status : Normal Open Port Name : Door Bell - 1 Authentication camera : 2 Open door port : 2 Open door key : ...... Alarm Duration (s) 10

Figure 25-1: GXV355X Open Door Configuration

- Alarm\_In Port:

Select "Input Port" from pull-down selection, this port has to be connected to the wire connecting to the Door Bell or Intercom circuit.

- Alarm\_Out Configuration:

Select "Open Door Request" to enable "Open Door" feature.

Once selected, the system will automatically enable the Alarm Input port just chosen.

Select the related IP Camera from the “Authentication Camera” pull-down selection (Camera 2 or Channel 2 in this example), also select related “Open Door Port” from the pull-down selection. (Alarm_Out port 2 in this example).

Make sure the related Open Door Port has physical connection or circuit to the door strike.

Fill in correctly the digit key to open door, and the Alarm Duration which is the timer the Alarm_Out port will send signal to relay to restore the state (10 seconds in the example).

NOTE:

Enter “#” key following the digits key to execute the operation.

- Hardware Wiring

Below are illustration of wiring diagram for the GVR355X.

GRANDSTREAM GXV3674_HD - - Hardware Wiring - 1

flowchart
graph TD
    A["Photocoupler"] -->|IN+| B["Alarm in"]
    A -->|IN-| C["Alarm out"]
    D["L32"] -->|OUT+| B
    D -->|OUT-| C
    E["Relay(Normal Open)"] -->|IN32| A
    E -->|IN4| A

Figure 25-2: Alarm_In and Alarm_Out Connection Circuit Sample for GVR355X

NOTE:

The Alarm_In and Alarm_Out circuit connection has to be similar to above circuit diagram and meet following requirement:

Alarm InputVin<15V, PINs (1.02KΩ)
Alarm Output125VAC/0.5A, 30VDC/2A, Normal Open, PINs

The Alarm_In circuit (like above photo coupler), if there is any voltage change smaller than 15V, as specification listed), the GVR355X Alarm_In port will detect it and trigger the action and event
The minimum duration is 500ms for the Alarm_In to trigger and the minimum voltage change should be bigger than 3V.
➢ Higher voltage and wrong polarity connection are prohibited because this will damage the devices. So please wiring correctly and do NOT connect the polarity wrong.
Any Door Bell circuit should be able to connected as Alarm_In, just make sure the polarity connected correctly and make sure the voltage change meets the requirement.

IN 1 2 3 4 G G A 1B 2A B OUT

Figure 25-3: Alarm_In and Alarm_Out Wiring Diagram for GVR355X

NOTE:

Alarm_In will share the "G" as Ground, make sure to connect the "Negative" or "-" cable into the interface marked with "G".

Alarm_Out port marked with A, B, please make sure to connect "Positive" or "+" cable into the port with "A", the "Negative" or "-" cable into the port with "B". (In the example, Port 2 configured as Alarm_Out operation to Open Door, see the cable connected into the GVR3552).

Alarm_Out duration in the above example is configured as “10 seconds” at the GVR355X. So the Alarm_Out will act for 10 seconds before revert back to previous state. In the example, the default is circuit “Open”, when Alarm_Out triggered, the circuit state changed to “Close”, as illustrated below for 10 seconds and then switch back to previous “Open” state.

If connecting to a multi-meter, you will see the Ohm changed from unlimited to several hundred Ohms during the Alarm_Out port action. See below Figure 8.

Also a “click” audible relay switching sound can be heard if closing enough to the GVR355X when the inside circuit doing the job.

IN 1 2 3 4 GG A1B2A3 OUT FLOKE 115 TRUE RMS MULTIMETER 0 L M Ω Auto 6 IN 1 2 3 4 GG A1B2A3 OUT FLUKE 115 TRUE RMS MULTIMETER 24.15 Ω 0 Auto 6:00

Figure 25-4: GVR355X Alarm_Out Circuit Measurement

Please contact Grandstream technical support if followed the above instructions but the feature still not working as expected. Please make sure the SIP Proxy or IP-PBX indeed have the related IP Camera and IP Video Phone registered.

Syslog Settings Page (Troubleshooting Help)

This page allows user to enable the Syslog to help troubleshooting problems:

Home Basic Settings Advanced Settings User Management Maintenance SMTP FTP Privacy Masks Alarm Server Time Lapse Photography Motion Detection Syslog SysLog Settings Syslog Server: Syslog Level: None None Debug Info Warning Error Save

Figure 26: Alarm Server Setting Page

  • Syslog Server: Syslog server IP or Domain Name
  • Syslog Lever: Lever of syslog message sent to the syslog server: None, Debug, Info, Warning, Error.

Software Upgrade

This page allows user to configure firmware upgrade.

Software upgrade can be done via TFTP, HTTP or HTTPS. The corresponding configuration settings are in the ADVANCED SETTINGS configuration page.

Home Basic Settings Advanced Settings User Management Maintenance SMTP FTP Privacy Masks Alarm Server Time Lapse Photography Motion Detection Syslog Restart the Device Restart the Device. Restart Restore the Device Reset Settings, except IP Address, to Factory Default. Restore Firmware Upgrade and Provisioning Upgrade via: HTTP Firmware Server Path: firmware.grandstream.com Config Server Path: config.grandstream.com XML Config File Password: ••••••• Automatic Upgrade Interval(Minutes): 10080 DHCP Option 66 Override Server: 3CX Auto Provision: Automatic Upgrade: ✓ Save

Figure 27: Firmware Upgrade and Provisioning

NOTE:

Grandstream recommends end-user use the Grandstream HTTP server: firmware.grandstream.com
For large companies, we recommend to maintain their own TFTP/HTTP/HTTPS server for upgrade and provisioning procedures.

Instructions for local firmware upgrade using TFTP server:

  1. Unzip the file and put all of them under the root directory of the TFTP server.
  2. Load the TFTP server from the PC and make sure the device in the same LAN segment.
  3. Please go to File -> Configure -> Security to change the TFTP server's default setting from "Receive Only" to "Transmit Only" for the firmware upgrade.
  4. Start the TFTP server.
  5. In webGUI of IP camera, configure the Firmware Server Path with the IP address of the PC.
  6. Update the change and reboot the unit

End users can also choose to download the free HTTP server from http://httpd.apache.org/ or use Microsoft IIS web server.

Configuration File Download

Grandstream SIP Device can be configured via Web Interface as well as via Configuration File through TFTP or HTTP/HTTPS. "Config Server Path" is the TFTP or HTTP/HTTPS server path for configuration file. It needs to be set to a valid URL, either in FQDN or IP address format. The "Config Server Path" can be same or different from the "Firmware Server Path".

A configuration parameter is associated with each particular field in the web configuration page. A parameter consists of a Capital letter P and 1 to 3 (Could be extended to 4 in the future) digit numeric numbers. i.e., P2 is associated with "Admin Password" in the ADVANCED SETTINGS page. For a detailed parameter list, please refer to the corresponding firmware release configuration template.

When Grandstream Device boots up or reboots, it will issue request for configuration file named "cfgxxxxxxxxxxxx.xml", where "xxxxxxxxxxxx" is the MAC address of the device, i.e., "cfg000b820102ab.xml". The configuration file name should be in lower cases.

Currently GXV3674_HD/FHD_VF v2 only support XML configuration.

RESTORE FACTORY DEFAULT SETTING

WARNING!

Restoring the Factory Default Setting will DELETE all configuration information of the camera. Please BACKUP or PRINT out all the settings before approach to following steps. Grandstream will not take any responsibility if you lose all the parameters of setting or cannot connect to your VoIP service provider.

Reset from Web Interface

This page allows user to configure dynamic network related parameters:

Home Basic Settings Advanced Settings User Management Maintenance SMTP FTP Privacy Masks Alarm Server Time Lapse Photography Motion Detection Syslog Restart the Device Restart the Device. Restart Restore the Device Reset Settings, except IP Address, to Factory Default. Restore Firmware Upgrade and Provisioning Upgrade via: HTTP Firmware Server Path: firmware.grandstream.com Config Server Path: config.grandstream.com XML Config File Password: ••••••• Automatic Upgrade Interval(Minutes): 10080 DHCP Option 65 Override Server: □ ① 3CX Auto Provision: □ ① Automatic Upgrade: ✓

Figure 28: Factory Reset from Web Interface

IP SURVEILLANCE FAQ

1. What is the default IP address of the GXV3674\_HD/FHD\_VF v2?

The default IP configuration is DHCP or 192.168.1.168 after booting up 5 minutes.

2. Why can I not view the live video stream in Microsoft Internet Explorer?

Please double check whether the Grandstream Plug-in/Active-X is installed correctly. Once you log into the GXV3674_HD/FHD_VF v2 web interface, Internet Explorer will indicate that this website wants to install to following add-on: "GSViewer.cab" from Grandstream Networks, Inc. Please install this add-on when prompted by IE.

3. How do you manually uninstall the Grandstream video viewer add-on for IE?

Please follow these steps to uninstall the add-on:

  1. Delete the GSViewerX Control from C:\WINDOWS\Downloaded Program Files directory
  2. Delete GSNetClient.dll, GS_Replay.exe, GSViewerX.ocx, hi_h264dec_w.dll,
    lik_VoiceEngine_dll.dll and GSViewerX.inf from C:\WINDOWS\system32

4. Why can't I access the GXV3674\_HD/FHD\_VF v2 web configuration interface?

Q 1: Is your internet service down?

A 1: Connect a PC to the internet to test the connection.

Q 2: Are the PC and the device in different subnets?

A 2: Check the subnet mask and default gateway of the device and PC.

Q 3: Is there a conflict with another IP address?

A 3: Try to change the IP address of the device.

Q 4: Has the HTTP port been changed?

A 4: Contact the administrator of the device for more information.

5. The GXV3674\_HD/FHD\_VF v2 web configuration page is not displayed correctly in IE8?

In IE8, Compatibility View might need to be enabled for the GXV3674_HD/FHD_VF v2 web configuration page to load properly. To enable compatibility view, open IE8, click Tools, Compatibility View Setting, and add the GXV3674_HD/FHD_VF v2 web configuration pages to the Compatibility View.

6. Why does IE indicate to install Grandstream Video Viewer add-on after a firmware upgrade? The add-on was properly installed before the firmware upgrade process.

New firmware will often upgrade the add-on as well. To watch the live video stream, you must install the newest version of the add-on.

7. How do you watch secondary video stream?

Login to the home page of the GXV3674_HD/FHD_VF v2 web GUI, click Play to watch the video stream. To watch a secondary video stream, right click on the video, and select Secondary Stream on the pop-up menu. Try reinstalling the Grandstream Viewer add-on for IE if you cannot see the video stream.

8. What is DDNS? Is it important for IP surveillance product to have DDNS support?

DDNS is an acronym for Dynamic Domain Name Service. It is important to choose an IP network camera that has DDNS support for dynamic IP addresses. Chances are that the network has a dynamic IP address (which changes with every log on). A DDNS service makes sure that the camera's IP address always matches up to the current server address. DDNS also allows a website to be linked to the IP camera that is constantly updated with the correct information and has a reliable feed.

9. Why is Windows Media Player unable to play the recorded video files?

The GXV3674_HD/FHD_VF v2 uses the H.264 video codec. Windows Media Player may lack the proper H.264 decoder to play the recorded video. Please download the Microsoft FFDShow H.264 decoder from http://sourceforge.net/projects/ffdshow-tryout/ and install it.

10. Alarm Triggered Events do not work with GSurf\_Pro?

Please double check the Alarm Action on your GXV3674_HD/FHD_VF v2. Login to the web GUI of the GXV3674_HD/FHD_VF v2, go to the Motion Detection or Alarm Events page, and make sure option Upload to Alarm Center is checked.

It is better to save video files in different directory to prevent accidental deletion of the recorded files you need.

12. How to use a cell phone to watch the GXV3674\_HD/FHD\_VF v2 video stream?

You must set the video resolution to QCIF to watch the GXV3674_HD/FHD_VF v2 video stream from a cell phone. Make sure to set the bit rate to 64kbps to ensure the best video quality.

13. What Smartphone application should I use to view the video?

There are free applications and paid version application for this, you can find them in Google Play for Android phone and Apple Store for iPhone, like: IP Cam Viewer:

GRANDSTREAM GXV3674_HD - What Smartphone application should I use to view the video? - 1

http://hit-mob.com/

14. Why the IP address of the device NOT reset when clicking the "Restore" button?

The GXV3674_HD/FHD_VF v2 could be installed in areas that are not easy to access. For example, it could be installed on the roof of a building or the ceiling of an office. This makes it difficult to reinstall the device, therefore the "Restore" function will not clear the IP address.

15. Why can't the live video stream be viewed using a mobile phone or GSurf\_Pro after changing the HTTP Port of the device?

Make sure that the RTSP port of the device is set to 2000 plus the HTTP Port number. For example, if the HTTP port is 88, then the RTSP port of the device that you configured on GSurf_Pro or mobile phone should be 2088.

16. Port forwarding

Two ports must be forwarded on your router to watch video from a GXV3674_HD/FHD_VF v2 that is located on a private network from a PC in a public network. The web port (HTTP) and the RTSP port. Please make note that the RTSP port number changes according to the web port. If the web port is 80, then the RTSP port is 554. If the web port is not 80, then the RTSP port equals the web port +2000. For example, if the web port is 88, then the RTSP port will be 2088.

Table of contents Click a title to access it
Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : GRANDSTREAM

Model : GXV3674_HD

Category : Security Camera