ZYXEL USGFLEX700-GB0101F - Firewall

USGFLEX700-GB0101F - Firewall ZYXEL - Free user manual and instructions

Find the device manual for free USGFLEX700-GB0101F ZYXEL in PDF.

📄 999 pages English EN Download 💬 AI Question 10 questions ⚙️ Specs
Notice ZYXEL USGFLEX700-GB0101F - page 28
Pick your language and provide your email: we'll send you a specifically translated version.
Product Type Next-Generation Firewall (NGFW)
Model USG FLEX 700
Dimensions (W x D x H) 430 x 300 x 44 mm (1U rackmount)
Weight Approx. 5.0 kg
Power Supply 100-240V AC, 50/60 Hz, 150W max
Default LAN IP 192.168.1.1 (HTTPS)
Default Username / Password admin / 1234
Firmware Version 4.60 Edition 1, 10/2020
WAN Interfaces Multiple Gigabit Ethernet (configurable as WAN, LAN, DMZ)
VPN Support IPsec, SSL VPN, L2TP over IPsec
Security Services Anti-Malware, IDP, Content Filter, App Patrol, Email Security, Reputation Filter, SSL Inspection
High Availability Device HA Pro (active/passive)
Wireless Management AP Controller (manages up to 256 APs)
USB Ports 2 x USB 3.0 (for storage, cellular dongle)
Console Port RJ-45 (115200 bps, 8N1)
Operating Temperature 0°C to 45°C
Certifications FCC Class A, CE, ICES-3 (A)/NMB-3(A)
Maintenance Keep vents clear; avoid moisture; use only provided power adapter
Safety Install indoors; do not open device; use grounded outlet
Warranty Varies by region; check local distributor

Frequently Asked Questions - USGFLEX700-GB0101F ZYXEL

How do I access the web configurator for the first time?
Connect your computer to the LAN port, set your IP to 192.168.1.x (subnet 255.255.255.0), then open a browser and go to https://192.168.1.1. Use default username admin and password 1234.
What should I do if I forget the admin password?
You must reset the device to factory defaults. Locate the reset button on the rear panel (or use a paperclip), press and hold for about 10 seconds until the power LED blinks. The device will reboot with default settings.
How can I update the firmware?
Go to Maintenance > File Manager > Firmware Management. You can upload a new firmware file (downloaded from Zyxel support) or use the Cloud Helper for automatic notifications. Always backup configuration before upgrade.
How do I configure a VPN connection?
Use the Quick Setup Wizards from the navigation panel, then select VPN Setup Wizard. Choose between IPsec, SSL VPN, or L2TP. Follow the wizard steps: define scenario, enter remote gateway and authentication details, then apply.
What security services require a license?
Services like Anti-Malware, IDP, Content Filter, App Patrol, Reputation Filter, Email Security require a subscription license. You can activate them via Configuration > Licensing > Registration after registering your device at myZyxel.
How do I register the device at myZyxel?
Go to Configuration > Licensing > Registration. You need a myZyxel account (create at portal.myzyxel.com). Enter the serial number and LAN MAC address (found on the device label) to register and activate services.
Can I manage multiple wireless APs with this firewall?
Yes, the USG FLEX 700 includes an AP Controller. Under Configuration > Wireless > Controller, you can add APs manually or via DHCP option 138. Managed APs are listed in Monitor > AP Information.
How to backup and restore the configuration?
Go to Maintenance > File Manager > Configuration File. Click Backup to download the current config file. To restore, upload a previously saved file and reboot. You can also schedule automatic backups.
What is the default LAN subnet?
The default LAN IP is 192.168.1.1/24. The device provides DHCP addresses in the range 192.168.1.10 to 192.168.1.200 (by default). You can change this in Configuration > Network > Interface > Ethernet > lan1.
How to troubleshoot internet connectivity issues?
Check the Dashboard for WAN interface status. Use Diagnostics > Network Tool to ping your gateway or ISP. Verify that the WAN interface has obtained an IP address. Ensure cables are connected and the correct port role is set.

User questions about USGFLEX700-GB0101F ZYXEL

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Firewall in PDF format for free! Find your manual USGFLEX700-GB0101F - ZYXEL and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. USGFLEX700-GB0101F by ZYXEL.

USER MANUAL USGFLEX700-GB0101F ZYXEL

ZyWALL USG FLEX Series

Default Login Details

LAN Port IP Address https//192.168.1.1
User Name admin
Password 1234

Version 4.60 Edition 1, 10/2020

ZYXEL USGFLEX700-GB0101F - ZyWALL USG FLEX Series - 1

natural_image Abstract geometric illustration of two stylized buildings with blue and white coloring, no text or symbols present

IMPORTANT!

READ CAREFULLY BEFORE USE.

KEEP THIS GUIDE FOR FUTURE REFERENCE.

This is a User's Guide for a series of products. Not all products support all firmware features. Screenshots and graphics in this book may differ slightly from your product due to differences in product features or web configurator brand style. Every effort has been made to ensure that the information in this manual is accurate.

Note: The version number on the cover page refers to the Zyxel Device's latest firmware version to which this User's Guide applies.

- Quick Start Guide

The Quick Start Guide shows how to connect the Zyxel Device and access the Web Configurator wizards. (See the wizard real time help for information on configuring each screen.) It also contains a connection diagram and package contents list.

- CLI Reference Guide

The CLI Reference Guide explains how to use the Command-Line Interface (CLI) to configure the Zyxel Device.

Note: It is recommended you use the Web Configurator to configure the Zyxel Device.

• Web Configurator Online Help

Click the help icon in any screen for help in configuring that screen and supplementary information.

- More Information

Go to support.zyxel.com to find other information on Zyxel Device.

QR code image containing encoded data, no visible human-readable text

Document Conventions

Warnings and Notes

These are how warnings and notes are shown in this guide.

Warnings tell you about things that could harm you or your device.

Note: Notes tell you other important information (for example, other things you may need to configure or helpful tips) or recommendations.

Syntax Conventions

  • All models in this series may be referred to as the "Zyxel Device" in this guide.
  • Product labels, screen names, field labels and field choices are all in bold font.
  • A right angle bracket (>) within a screen name denotes a mouse click. For example, Configuration > Network > Interface > Ethernet means you first click Configuration in the navigation panel, then Network, then the Interface sub menu and finally the Ethernet tab to get to that screen.

Icons Used in Figures

Figures in this user guide may use the following generic icons. The Zyxel Device icon is not an exact representation of your device.

Zyxel DeviceZYXEL USGFLEX700-GB0101F - Icons Used in Figures - 1Generic RouterZYXEL USGFLEX700-GB0101F - Icons Used in Figures - 2Wireless Router / Access PointZYXEL USGFLEX700-GB0101F - Icons Used in Figures - 3
Switch Firewall ServerZYXEL USGFLEX700-GB0101F - Icons Used in Figures - 4ZYXEL USGFLEX700-GB0101F - Icons Used in Figures - 5ZYXEL USGFLEX700-GB0101F - Icons Used in Figures - 6
Internet Network Cloud SmartphoneZYXEL USGFLEX700-GB0101F - Icons Used in Figures - 7ZYXEL USGFLEX700-GB0101F - Icons Used in Figures - 8ZYXEL USGFLEX700-GB0101F - Icons Used in Figures - 9
USB DongleZYXEL USGFLEX700-GB0101F - Icons Used in Figures - 10

Contents Overview

Introduction 27

Initial Setup Wizard 51

Hardware, Interfaces and Zones 70

Quick Setup Wizards 79

Dashboard 113

Monitor 124

Licensing 196

Wireless 202

Interfaces 228

Routing 325

DDNS 352

NAT 358

Redirect Service 375

ALG 381

UPnP 388

IP/MAC Binding 403

Layer 2 Isolation 408

DNS Inbound LB 412

IPSec VPN 418

SSL VPN 454

L2TP VPN 460

BWM (Bandwidth Management) 465

Web Authentication 481

Hotspot 513

Printer Manager 531

Free Time 543

IPnP 548

Walled Garden 551

Advertisement Screen 557

Security Policy 560

Application Patrol 586

Content Filter 595

Anti-Malware 620

Reputation Filter 640

IDP 651

Email Security 675

SSL Inspection 693

IP Exception 707

Object 710

Device HA 826

Cloud CNM 833

System 841

Log and Report 902

File Manager 915

Diagnostics 931

Packet Flow Explore 952

Shutdown 959

Troubleshooting 963

Table of Contents

Document Conventions ....3

Contents Overview 4

Table of Contents......6

Part I: User's Guide....26

Chapter 1 Introduction ......27

1.1 Overview 27

1.1.1 Model Feature Differences 27

1.2 Registration at myZyxel 28

1.2.1 Grace Period 29

1.2.2 Applications ...... 29

1.3 Management Overview 32

1.4 Web Configurator 33

1.4.1 Web Configurator Access 33

1.4.2 Web Configurator Screens Overview 36

1.4.3 Navigation Panel 40

1.4.4 Tables and Lists 48

Chapter 2 Initial Setup Wizard....51

2.1 Initial Setup Wizard Screens 51

2.1.1 Internet Access Setup - WAN Interface 51

2.1.2 Internet Access: Ethernet 52

2.1.3 Internet Access: PPPoE 53

2.1.4 Internet Access: PPTP 55

2.1.5 Internet Access: L2TP 57

2.1.6 Internet Access Setup - Second WAN Interface 59

2.1.7 Internet Access: Congratulations 60

2.1.8 Date and Time Settings 61

2.1.9 Register Device 61

2.1.10 Activate Service 63

2.1.11 Service Settings 64

2.1.12 Service Settings: SecuReporter 65

2.1.13 Wireless Settings: Management Mode 66

2.1.14 Wireless Settings: AP Controller 67
2.1.15 Wireless Settings: SSID & Security 67
2.1.16 Remote Management 68

Chapter 3

Hardware, Interfaces and Zones....70

3.1 Hardware Overview 70

3.1.1 Front Panels 70
3.1.2 Rear Panels 72

3.2 Installation Scenarios 74

3.2.1 Desktop Installation Procedure 74
3.2.2 Rack-mounting 75
3.2.3 Wall-mounting 76

3.3 Default Zones, Interfaces, and Ports 77
3.4 Stopping the Zyxel Device 78

Chapter 4

Quick Setup Wizards....79

4.1 Quick Setup Overview 79
4.2 WAN Interface Quick Setup 80

4.2.1 Choose an Ethernet Interface 80
4.2.2 Select WAN Type 81
4.2.3 Configure WAN IP Settings 81
4.2.4 ISP and WAN and ISP Connection Settings 82
4.2.5 Quick Setup Interface Wizard: Summary 85

4.3 VPN Setup Wizard 86

4.3.1 Welcome 86
4.3.2 VPN Setup Wizard: Wizard Type 87
4.3.3 VPN Express Wizard - Scenario 88
4.3.4 VPN Express Wizard - Configuration 89
4.3.5 VPN Express Wizard - Summary 89
4.3.6 VPN Express Wizard - Finish 90
4.3.7 VPN Advanced Wizard - Scenario 91
4.3.8 VPN Advanced Wizard - Phase 1 Settings 92
4.3.9 VPN Advanced Wizard - Phase 2 94
4.3.10 VPN Advanced Wizard - Summary 95
4.3.11 VPN Advanced Wizard - Finish 97

4.4 VPN Settings for Configuration Provisioning Wizard: Wizard Type 98

4.4.1 Configuration Provisioning Express Wizard - VPN Settings 98
4.4.2 Configuration Provisioning VPN Express Wizard - Configuration 99
4.4.3 VPN Settings for Configuration Provisioning Express Wizard - Summary 100
4.4.4 VPN Settings for Configuration Provisioning Express Wizard - Finish 101
4.4.5 VPN Settings for Configuration Provisioning Advanced Wizard - Scenario 102

4.4.6 VPN Settings for Configuration Provisioning Advanced Wizard - Phase 1 Settings .... 103
4.4.7 VPN Settings for Configuration Provisioning Advanced Wizard - Phase 2 ...... 104
4.4.8 VPN Settings for Configuration Provisioning Advanced Wizard - Summary 105
4.4.9 VPN Settings for Configuration Provisioning Advanced Wizard - Finish 108

4.5 VPN Settings for L2TP VPN Settings Wizard 108

4.5.1 L2TP VPN Settings 109
4.5.2 L2TP VPN Settings 110
4.5.3 VPN Settings for L2TP VPN Setting Wizard - Summary 110
4.5.4 VPN Settings for L2TP VPN Setting Wizard - Completed 112

Chapter 5 Dashboard....113

5.1 Overview 113

5.1.1 What You Can Do in this Chapter 113

5.2 The General Screen 113

5.2.1 Device Information Screen 115
5.2.2 System Status Screen 116
5.2.3 Tx/Rx Statistics 116
5.2.4 The Latest Logs Screen 117
5.2.5 System Resources Screen 117
5.2.6 DHCP Table Screen 118
5.2.7 Number of Login Users Screen 119
5.2.8 Current Login User 120
5.2.9 VPN Status 120
5.2.10 SSL VPN Status 121

5.3 The Advanced Threat Protection Screen 121

Part II: Technical Reference....123

Chapter 6 Monitor....124

6.1 Overview 124
6.1.1 What You Can Do in this Chapter 124
6.2 The Port Statistics Screen 126
6.2.1 The Port Statistics Graph Screen 127
6.3 Interface Status Screen 128
6.4 The Traffic Statistics Screen 132
6.5 The Session Monitor Screen 135
6.6 The Login Users Screen 137
6.7 Dynamic Guest 138
6.8 IGMP Statistics 139

6.9 The DDNS Status Screen 140

6.10 IP/MAC Binding 141

6.11 Cellular Status Screen 142

6.11.1 More Information .... 144

6.12 The UPnP Port Status Screen 145

6.13 USB Storage Screen 146

6.14 Ethernet Neighbor Screen 147

6.15 FQDN Object Screen 148

6.16 Virtual Server Load Balancing 150

6.17 AP Information: AP List 151

6.17.1 AP List: More Information 155

6.17.2 AP List: Edit AP 158

6.18 AP Information: Radio List 161

6.18.1 Radio List: More Information 163

6.19 AP Information: Top N APs 165

6.20 AP Information: Single AP 166

6.21 ZyMesh 167

6.22 SSID Info 168

6.23 Station Info: Station List 169

6.24 Station Info: Top N Stations 170

6.25 Station Info: Single Station 171

6.26 Detected Device 172

6.27 The Printer Status Screen 173

6.28 The IPSec Screen 174

6.29 The SSL Screen 175

6.30 The L2TP over IPSec Screen 176

6.31 The App Patrol Screen 177

6.32 The Content Filter Screen 178

6.33 The Anti-Malware Screen 179

6.34 The Reputation Filter Screen 182

6.35 The IDP Screen 183

6.36 The Email Security Screens 185

6.36.1 Email Security Summary 185

6.36.2 The Email Security Status Screen 187

6.37 The SSL Inspection Screens 188

6.37.1 Certificate Cache List 189

6.38 Log Screens 190

6.38.1 View Log 191

6.38.2 View AP Log 192

6.38.3 Dynamic Users Log 194

Chapter 7

Licensing 196

7.1 Registration Overview 196

7.1.1 What you Need to Know 196
7.1.2 Registration Screen 197
7.1.3 Service Screen 197

7.2 Signature Update 199

7.2.1 What you Need to Know 199
7.2.2 The Signature Screen 200
7.2.3 Auto Update 200

Chapter 8 Wireless....202

8.1 Overview 202

8.1.1 What You Can Do in this Chapter 202

8.2 Controller Screen 202

8.2.1 Connecting an AP to the Zyxel Device 203
8.2.2 Connecting an AP to the Zyxel Device Manually 203
8.2.3 Connecting an AP to the Zyxel Device Using DHCP Option 138 ...... 203

8.3 AP Management Screens 204

8.3.1 Mgmt. AP List 204
8.3.2 AP Policy 211
8.3.3 AP Group 212
8.3.4 Firmware 218

8.4 Rogue AP 220

8.4.1 Add/Edit Rogue/Friendly List 222

8.5 Auto Healing 223

8.6 RTLS Overview 224

8.6.1 What You Can Do in this Chapter 224
8.6.2 Before You Begin 224
8.6.3 Configuring RTLS 225

8.7 Technical Reference 226

8.7.1 Dynamic Channel Selection 226
8.7.2 Load Balancing 227

Chapter 9 Interfaces......228

9.1 Interface Overview 228

9.1.1 What You Can Do in this Chapter 228
9.1.2 What You Need to Know 228
9.1.3 What You Need to Do First 233

9.2 Port Role 233

9.3 Port Configuration 234

9.4 Ethernet Summary Screen 235

9.4.1 Ethernet Edit 237

9.4.2 Proxy ARP 253
9.4.3 Virtual Interfaces 254
9.4.4 References 255
9.4.5 Add/Edit DHCPv6 Request/Release Options 256
9.4.6 Add/Edit DHCP Extended Options 257

9.5 PPP Interfaces 258

9.5.1 PPP Interface Summary 259
9.5.2 PPP Interface Add or Edit 260

9.6 Cellular Configuration Screen 265

9.6.1 Cellular Choose Slot 268
9.6.2 Add / Edit Cellular Configuration 268

9.7 Tunnel Interfaces 274

9.7.1 Configuring a Tunnel 276
9.7.2 Tunnel Add or Edit Screen 277

9.8 VLAN Interfaces 281

9.8.1 VLAN Summary Screen 282
9.8.2 VLAN Add/Edit 283

9.9 Bridge Interfaces 294

9.9.1 Bridge Summary 296
9.9.2 Bridge Add/Edit 297

9.10 VTI 308

9.10.1 Restrictions for IPSec Virtual Tunnel Interface 308
9.10.2 VTI Screen 309
9.10.3 VTI Add/Edit 309

9.11 Trunk Overview 313

9.11.1 What You Need to Know 313

9.12 The Trunk Summary Screen 316

9.12.1 Configuring a User-Defined Trunk 317
9.12.2 Configuring the System Default Trunk 319

9.13 Interface Technical Reference 320

Chapter 10 Routing ....325

10.1 Policy and Static Routes Overview 325

10.1.1 What You Can Do in this Chapter 325
10.1.2 What You Need to Know 326

10.2 Policy Route Screen 327
10.2.1 Policy Route Edit Screen 329
10.3 IP Static Route Screen 334
10.3.1 Static Route Add/Edit Screen 334
10.4 Policy Routing Technical Reference 336
10.5 Routing Protocols Overview 336
10.5.1 What You Need to Know 337

10.6 The RIP Screen 337
10.7 The OSPF Screen 339

10.7.1 Configuring the OSPF Screen 342
10.7.2 OSPF Area Add/Edit Screen 343
10.7.3 Virtual Link Add/Edit Screen 345

10.8 BGP (Border Gateway Protocol) 346

10.8.1 Allow BGP Packets to Enter the Zyxel Device 347
10.8.2 Configuring the BGP Screen 347
10.8.3 The BGP Neighbors Screen 349
10.8.4 Example Scenario 350

Chapter 11

DDNS 352

11.1 DDNS Overview 352

11.1.1 What You Can Do in this Chapter 352
11.1.2 What You Need to Know 352

11.2 The DDNS Screen 353

11.2.1 The Dynamic DNS Add/Edit Screen 354

Chapter 12

NAT 358

12.1 Overview 358
12.2 NAT Overview 358

12.2.1 What You Can Do in this Chapter 358
12.2.2 What You Need to Know 359

12.3 The NAT Screen 360

12.3.1 The NAT Add/Edit Screen 361

12.4 NAT Technical Reference 364
12.5 Virtual Server Load Balancing 366

12.5.1 Load Balancing Example 1 366
12.5.2 Load Balancing Example 2 .... 367
12.5.3 Virtual Server Load Balancing Process 367
12.5.4 Load Balancing Rules 368
12.5.5 Virtual Server Load Balancing Algorithms 369

12.6 The Virtual Server Load Balancer Screen 370

12.6.1 Adding/Editing a Virtual Server Load Balancing Rule 371

Chapter 13

Redirect Service 375

13.1 Overview 375

13.1.1 HTTP Redirect 375
13.1.2 SMTP Redirect 375
13.1.3 What You Can Do in this Chapter 376

13.1.4 What You Need to Know 376

13.2 The Redirect Service Screen 378

13.2.1 The Redirect Service Edit Screen 379

Chapter 14

ALG 381

14.1 ALG Overview 381

14.1.1 What You Need to Know 381

14.1.2 Before You Begin 384

14.2 The ALG Screen 384

14.3 ALG Technical Reference 386

Chapter 15

UPnP 388

15.1 UPnP and NAT-PMP Overview 388

15.2 What You Need to Know 388

15.2.1 NAT Traversal 388

15.2.2 Cautions with UPnP and NAT-PMP 389

15.3 UPnP Screen 389

15.4 Technical Reference 390

15.4.1 Turning on UPnP in Windows 7 Example 390

15.4.2 Turn on UPnP in Windows 10 Example 394

15.4.3 Auto-discover Your UPnP-enabled Network Device 396

15.4.4 Web Configurator Easy Access in Windows 7 399

15.4.5 Web Configurator Easy Access in Windows 10 401

Chapter 16

IP/MAC Binding 403

16.1 IP/MAC Binding Overview 403

16.1.1 What You Can Do in this Chapter 403

16.1.2 What You Need to Know 403

16.2 IP/MAC Binding Summary 404

16.2.1 IP/MAC Binding Edit 405

16.2.2 Static DHCP Edit 406

16.3 IP/MAC Binding Exempt List 407

Chapter 17

Layer 2 Isolation....408

17.1 Overview 408

17.1.1 What You Can Do in this Chapter 408

17.2 Layer-2 Isolation General Screen 408

17.3 White List Screen 409

17.3.1 Add/Edit White List Rule 410

Chapter 18

DNS Inbound LB 412

18.1 DNS Inbound Load Balancing Overview 412

18.1.1 What You Can Do in this Chapter 412

18.2 The DNS Inbound LB Screen 413

18.2.1 The DNS Inbound LB Add/Edit Screen 414
18.2.2 The DNS Inbound LB Add/Edit Member Screen 416

Chapter 19

IPSec VPN 418

19.1 Virtual Private Networks (VPN) Overview 418

19.1.1 What You Can Do in this Chapter 420
19.1.2 What You Need to Know 420
19.1.3 Before You Begin 423

19.2 The VPN Connection Screen 423

19.2.1 The VPN Connection Add/Edit Screen 425

19.3 The VPN Gateway Screen 432

19.3.1 The VPN Gateway Add/Edit Screen 433

19.4 VPN Concentrator 440

19.4.1 VPN Concentrator Requirements and Suggestions 440
19.4.2 VPN Concentrator Screen 441
19.4.3 The VPN Concentrator Add/Edit Screen 441

19.5 Zyxel Device IPSec VPN Client Configuration Provisioning 442
19.6 IPSec VPN Background Information 444

Chapter 20

SSL VPN 454

20.1 Overview 454

20.1.1 What You Can Do in this Chapter 454
20.1.2 What You Need to Know 454

20.2 The SSL Access Privilege Screen 455
20.2.1 The SSL Access Privilege Policy Add/Edit Screen 456
20.3 The SSL Global Setting Screen 458

Chapter 21

L2TP VPN 460

21.1 Overview 460

21.1.1 What You Can Do in this Chapter 460
21.1.2 What You Need to Know 460

21.2 L2TP VPN Screen 461

21.2.1 Example: L2TP and Zyxel Device Behind a NAT Router 463

Chapter 22

BWM (Bandwidth Management) 465

22.1 Overview 465

22.1.1 What You Can Do in this Chapter 465
22.1.2 What You Need to Know 465

22.2 The Bandwidth Management Configuration 469

22.2.1 The Bandwidth Management Add/Edit Screen 472

Chapter 23

Web Authentication ....481

23.1 Web Auth Overview 481

23.1.1 What You Can Do in this Chapter 481
23.1.2 What You Need to Know 482

23.2 Web Authentication General Screen 482

23.2.1 User-aware Access Control Example 487
23.2.2 Authentication Type Screen 493
23.2.3 Custom Web Portal / User Agreement File Screen 497
23.2.4 Facebook Wi-Fi Screen 498

23.3 SSO Overview 502
23.4 SSO - Zyxel Device Configuration 503

23.4.1 Configuration Overview 504
23.4.2 Configure the Zyxel Device to Communicate with SSO 504
23.4.3 Enable Web Authentication 505
23.4.4 Create a Security Policy 506
23.4.5 Configure User Information 507
23.4.6 Configure an Authentication Method 508
23.4.7 Configure Active Directory 509

23.5 SSO Agent Configuration 510

Chapter 24

Hotspot....513

24.1 Overview 513
24.2 Billing Overview 513

24.2.1 What You Need to Know 513

24.3 The Billing > General Screen 514
24.4 The Billing > Billing Profile Screen 516

24.4.1 The Account Generator Screen 517
24.4.2 The Account Redeem Screen 520
24.4.3 The Billing Profile Add/Edit Screen 522

24.5 The Billing > Discount Screen 523

24.5.1 The Discount Add/Edit Screen 525

24.6 The Billing > Payment Service Screen 525

24.6.1 The Payment Service > Desktop / Mobile View Screen 527

Chapter 25

Printer Manager 531

25.1 Printer Manager Overview 531

25.1.1 What You Can Do in this Chapter 531

25.2 The Printer Manager > General Screen 531

25.2.1 Add Printer Rule 534

25.2.2 Edit Printer Rule 534

25.2.3 Discover Printer 535

25.2.4 Edit Printer Manager (Discover Printer) 537

25.3 The Printout Configuration Screen 538

25.4 Printer Reports Overview 539

25.4.1 Key Combinations .... 539

25.4.2 Daily Account Summary 539

25.4.3 Monthly Account Summary 540

25.4.4 Account Report Notes 540

25.4.5 System Status 541

Chapter 26

Free Time....543

26.1 Free Time Overview 543

26.1.1 What You Can Do in this Chapter 543

26.2 The Free Time Screen 543

Chapter 27

IPnP 548

27.1 IPnP Overview 548

27.1.1 What You Can Do in this Chapter 549

27.1.2 IPnP Screen 549

Chapter 28

Walled Garden....551

28.1 Walled Garden Overview 551

28.2 Walled Garden > General Screen 551

28.3 Walled Garden > URL Base Screen 552

28.3.1 Adding/Editing a Walled Garden URL 553

28.4 Walled Garden > Domain/IP Base Screen 554

28.4.1 Adding/Editing a Walled Garden Domain or IP 555

28.4.2 Walled Garden Login Example 555

Chapter 29

29.1 Advertisement Overview 557

29.1.1 Adding/Editing an Advertisement URL 558

Chapter 30

Security Policy 560

30.1 Overview 560
30.2 One Security 561
30.3 What You Can Do in this Chapter 564

30.3.1 What You Need to Know 564

30.4 The Security Policy Screen 566

30.4.1 Configuring the Security Policy Control Screen 567
30.4.2 The Security Policy Control Add/Edit Screen 571

30.5 Anomaly Detection and Prevention Overview 572

30.5.1 The Anomaly Detection and Prevention General Screen 573
30.5.2 Creating New ADP Profiles 574
30.5.3 Traffic Anomaly Profiles 575
30.5.4 Protocol Anomaly Profiles 578

30.6 The Session Control Screen 581
30.6.1 The Session Control Add/Edit Screen 582
30.7 Security Policy Example Applications 583

Chapter 31

Application Patrol 586

31.1 Overview 586

31.1.1 What You Can Do in this Chapter 586
31.1.2 What You Need to Know 586

31.2 Application Patrol Profile 587

31.2.1 Profile Action: Apply to a Security Policy 588
31.2.2 Application Patrol Profile > Add/Edit - My Application 591
31.2.3 Application Patrol Profile > Add/Edit - Query Result 592

Chapter 32

Content Filter 595

32.1 Overview 595

32.1.1 What You Can Do in this Chapter 595
32.1.2 What You Need to Know 595
32.1.3 Before You Begin 597

32.2 Content Filter Profile Screen 597

32.2.1 Apply to a Security Policy 598
32.2.2 Content Filter Add Profile Category Service 601
32.2.3 Content Filter Add Filter Profile Custom Service 614

32.3 Content Filter Trusted Web Sites Screen 616
32.4 Content Filter Forbidden Web Sites Screen 617
32.5 Content Filter Technical Reference 618

Chapter 33

Anti-Malware 620

33.1 Overview 620

33.1.1 What You Can Do in this Chapter 624

33.2 Anti-Malware Screen 625

33.3 The White List Screen 628

33.4 The Black List Screen 630

33.5 Anti-Malware Signature Searching 631

33.6 Anti-Malware Profile 632

33.6.1 Add or Edit an Anti-Malware Profile 633

33.6.2 Link a Profile 634

33.6.3 Anti-Malware Advance Screen 635

33.6.4 Remove Profiles 637

33.7 Anti-Malware Technical Reference 638

Chapter 34

Reputation Filter 640

34.1 Overview 640

34.1.1 What You Need to Know 640

34.1.2 What You Can Do in this Chapter 640

34.2 URL Threat Filter Screen 640

34.2.1 URL Threat Filter White List Screen 642

34.2.2 URL Threat Filter Black List Screen 643

34.3 URL Threat Filter Profile 644

34.3.1 Add or Edit a URL Threat Filter Profile 645

34.3.2 Link a Profile 647

34.3.3 URL Threat Filter Advance Screen 648

34.3.4 Remove Profiles 650

Chapter 35

IDP 651

35.1 Overview 651

35.1.1 What You Can Do in this Chapter 651

35.1.2 What You Need To Know 651

35.1.3 Before You Begin 651

35.2 The IDP Screen 652

35.2.1 Query Example 656

35.3 IDP Custom Signatures 657

35.3.1 Add / Edit Custom Signatures 658

35.3.2 Custom Signature Example 662

35.3.3 Applying Custom Signatures 664

35.3.4 Verifying Custom Signatures 665

35.4 The White List Screen 665

35.5 IDP Profile 666

35.5.1 Add or Edit an IDP Profile 667

35.5.2 Link a Profile 669

35.5.3 The IDP Advance Screen 670

35.5.4 Remove Profiles 672

35.6 IDP Technical Reference 673

Chapter 36

Email Security 675

36.1 Overview 675

36.1.1 What You Can Do in this Chapter 675

36.1.2 What You Need to Know 675

36.2 Before You Begin 676

36.3 The Email Security Screen 677

36.4 The Black List / White List Screen 679

36.4.1 The Black or White List Add/Edit Screen 680

36.4.2 Regular Expressions in Black or White List Entries 682

36.5 Email Security Profile 682

36.5.1 Add or Edit Email Security Profile 683

36.5.2 Link a Profile 685

36.5.3 The Email Security Advance Screen 686

36.5.4 Remove Profiles 689

36.6 Email Security Technical Reference 689

Chapter 37

SSL Inspection....693

37.1 Overview 693

37.1.1 What You Can Do in this Chapter 693

37.1.2 What You Need To Know 694

37.1.3 What You Can Do in this Chapter 694

37.1.4 Before You Begin 694

37.2 The SSL Inspection Profile Screen 694

37.2.1 Apply to a Security Policy 697

37.2.2 Add / Edit SSL Inspection Profiles 700

37.3 Exclude List Screen 701

37.4 Certificate Update Screen 703

37.5 Install a CA Certificate in a Browser 704

Chapter 38

IP Exception....707

38.1 Overview 707

38.2 The IP Exception Screen 707

38.2.1 The IP Exception Add/Edit Screen 708

Chapter 39

Object 710

39.1 Zones Overview 710

39.1.1 What You Need to Know 710
39.1.2 The Zone Screen 711

39.2 User/Group Overview 713

39.2.1 What You Need To Know 713
39.2.2 User/Group User Summary Screen 715
39.2.3 User Add/Edit General Screen 716
39.2.4 User Add/Edit Two-factor Authentication Screen 720
39.2.5 User/Group Group Summary Screen 722
39.2.6 User/Group Setting Screen 724
39.2.7 User/Group MAC Address Summary Screen 729
39.2.8 User /Group Technical Reference 731

39.3 AP Profile Overview 731

39.3.1 Radio Screen 733
39.3.2 SSID Screen 740

39.4 MON Profile 757

39.4.1 Overview 757
39.4.2 Configuring MON Profile 758
39.4.3 Add/Edit MON Profile 759
39.4.4 Technical Reference 760

39.5 ZyMesh Overview 761

39.5.1 ZyMesh Profile 763
39.5.2 Add/Edit ZyMesh Profile 764

39.6 Address/Geo IP Overview 764

39.6.1 What You Need To Know 765
39.6.2 Address Summary Screen 765
39.6.3 Address Group Summary Screen 769
39.6.4 Geo IP Summary Screen 771

39.7 Service Overview 774

39.7.1 What You Need to Know 774
39.7.2 The Service Summary Screen 775
39.7.3 The Service Group Summary Screen 777

39.8 Schedule Overview 779

39.8.1 What You Need to Know 779
39.8.2 The Schedule Screen 780
39.8.3 The Schedule Group Screen 783

39.9 AAA Server Overview 784

39.9.1 Directory Service (AD/LDAP) 785
39.9.2 RADIUS Server 785
39.9.3 ASAS 785
39.9.4 What You Need To Know 786

39.9.5 Active Directory or LDAP Server Summary 787
39.9.6 RADIUS Server Summary 791

39.10 Auth. Method Overview 794

39.10.1 Before You Begin 794
39.10.2 Example: Selecting a VPN Authentication Method 794
39.10.3 Authentication Method Objects 795
39.10.4 Two-Factor Authentication 797
39.10.5 Two-Factor Authentication VPN Access 799
39.10.6 Two-Factor Authentication Admin Access 801

39.11 Certificate Overview 802

39.11.1 What You Need to Know 803
39.11.2 Verifying a Certificate 804
39.11.3 The My Certificates Screen 805
39.11.4 The Trusted Certificates Screen 814
39.11.5 Certificates Technical Reference 819

39.12 ISP Account Overview 819

39.12.1 ISP Account Summary 819

39.13 DHCPv6 Overview 822

39.13.1 The DHCPv6 Request Screen 822
39.13.2 The DHCPv6 Lease Screen 824

Chapter 40

Device HA....826

40.1 Device HA Overview 826
40.1.1 What You Can Do in These Screens 826
40.2 Device HA Status 826
40.3 Device HA Pro 828

40.3.1 Deploying Device HA Pro 829
40.3.2 Configuring Device HA Pro 829

40.4 View Log 831

Chapter 41

Cloud CNM 833

41.1 Cloud CNM Overview 833
41.1.1 What You Can Do in this Chapter 833
41.2 Cloud CNM SecuManager 833
41.3 Cloud CNM SecuReporter 836

Chapter 42

System 841

42.1 Overview 841
42.1.1 What You Can Do in this Chapter 841
42.2 Host Name 842

42.3 USB Storage 842
42.4 Date and Time 843

42.4.1 Pre-defined NTP Time Servers List 846
42.4.2 Time Server Synchronization 846

42.5 Console Port Speed 847

42.6 DNS Overview 848

42.6.1 DNS Server Address Assignment 848
42.6.2 Configuring the DNS Screen 848
42.6.3 (IPv6) Address Record 852
42.6.4 PTR Record 852
42.6.5 Adding an (IPv6) Address/PTR Record 852
42.6.6 CNAME Record 853
42.6.7 Adding a CNAME Record 853
42.6.8 Domain Zone Forwarder 854
42.6.9 Adding a Domain Zone Forwarder 854
42.6.10 MX Record 855
42.6.11 Adding a MX Record 855
42.6.12 Security Option Control 856
42.6.13 Editing a Security Option Control 856
42.6.14 Adding a DNS Service Control Rule 857

42.7 WWW Overview 858

42.7.1 Service Access Limitations 858
42.7.2 System Timeout 858
42.7.3 HTTPS 858
42.7.4 Configuring WWW Service Control 859
42.7.5 Service Control Rules 862
42.7.6 Customizing the WWW Login Page 863
42.7.7 HTTPS Example 868

42.8 SSH 875

42.8.1 SSH Implementation on the Zyxel Device 876
42.8.2 Requirements for Using SSH 876
42.8.3 Configuring SSH 876
42.8.4 Service Control Rules 877
42.8.5 SSH Example 878

42.9 Telnet 879

42.9.1 Configuring Telnet 879
42.9.2 Service Control Rules 881

42.10 FTP 881

42.10.1 Configuring FTP 881
42.10.2 Service Control Rules 883

42.11 SNMP 883

42.11.1 SNMPv3 and Security 884
42.11.2 Supported MIBs 885

42.11.3 SNMP Traps 885
42.11.4 Configuring SNMP 885
42.11.5 Add SNMPv3 User 887
42.11.6 Service Control Rules 888

42.12 Authentication Server 889
42.12.1 Add/Edit Trusted RADIUS Client 890
42.13 Notification > Mail Server 891
42.14 Notification > SMS 892
42.15 Notification > Response Message 894
42.16 Language Screen 895
42.17 IPv6 Screen 896
42.18 Zyxel One Network (ZON) Utility 896

42.18.1 Requirements 896
42.18.2 Run the ZON Utility 897
42.18.3 Zyxel One Network (ZON) System Screen 901

Chapter 43

Log and Report....902

43.1 Overview 902
43.1.1 What You Can Do In this Chapter 902
43.2 Email Daily Report 902
43.3 Log Setting Screens 904

43.3.1 Log Setting Summary 904
43.3.2 Edit System Log Settings 905
43.3.3 Edit Log on USB Storage Setting 909
43.3.4 Edit Remote Server Log Settings 910
43.3.5 Log Category Settings Screen 912

Chapter 44

File Manager 915

44.1 Overview 915

44.1.1 What You Can Do in this Chapter 915
44.1.2 What you Need to Know 915

44.2 The Configuration Screen 917

44.2.1 The Configuration Schedule Backup Screen 921

44.3 Firmware Management 922

44.3.1 Cloud Helper 923
44.3.2 The Firmware Management Screen 925
44.3.3 Firmware Upgrade via USB Stick 928

44.4 The Shell Script Screen 928

Chapter 45

Diagnostics 931

45.1 Overview 931

45.1.1 What You Can Do in this Chapter 931

45.2 The Diagnostics Screens 931

45.2.1 Scripts 931

45.2.2 The Diagnostics Controller Screen 932

45.2.3 The Diagnostics AP Screen 934

45.2.4 The Diagnostics Files Screen 936

45.3 The Packet Capture Screen 937

45.3.1 The Packet Capture on AP Screen 940

45.3.2 The Packet Capture Files Screen 943

45.4 The CPU / Memory Status Screen 944

45.5 The System Log Screen 946

45.6 The Network Tool Screen 946

45.7 The Routing Traces Screen 949

45.8 The Wireless Frame Capture Screen 950

45.8.1 The Wireless Frame Capture Files Screen 951

Chapter 46

Packet Flow Explore 952

46.1 Overview 952

46.1.1 What You Can Do in this Chapter 952

46.2 Routing Status 952

46.3 The SNAT Status Screen 956

Chapter 47

Shutdown 959

47.1 Overview 959

47.1.1 What You Need To Know 959

47.2 The Shutdown / Reboot Screen 959

Part III: Appendices and Troubleshooting....962

Chapter 48

Troubleshooting....963

48.1 Resetting the Zyxel Device 976

48.2 Getting More Troubleshooting Help 976

Appendix A Customer Support 977

Appendix B Product Features 983

Appendix C Legal Information 986

Index 996

PART I

User's Guide

CHAPTER 1 Introduction

1.1 Overview

Zyxel Device refers to these models as outlined below.

  • USG FLEX 100
  • USG FLEX 100W
  • USG FLEX 200
  • USG FLEX 500
  • USG FLEX 700

1.1.1 Model Feature Differences

Note the following differences between the USG FLEX models:

Table 1 USG FLEX Model Feature Comparison

FEATURE/ MODELUSG FLEX 100USG FLEX 100WUSG FLEX 200USG FLEX 500USG FLEX 700
Microsoft Azure YES YES YES YES YES
Amazon VPCCLI onlyCLI onlyCLI onlyCLI onlyCLI only
Anomaly Detection & PreventionYESYESYESYESYES
Email Security (Anti-Spam)YESYESYESYESYES
IDP YES YES YES YES
Anti-Malware YES YES YES YES YES
App Patrol YES YES YES YES YES
Web Filtering (Content Filtering)YESYESYESYESYES
SecuReporterYESYESYESYESYES
Reputation Filter (IP and DNS)NONONONONO
URL Threat FilterYESYESYESYESYES
SandboxingNONONONONO
IP ExceptionYESYESYESYESYES
AP ControllerYESYESYESYESYES
Device HA ProNONONOYESYES
Hotspot ManagementNONOYESYESYES
LAGNONONOYESYES
Port GroupYESYESYESYESYES
Port RoleYESYESYESYESYES
SD-WAN ModeNONONONONO
SSL Application YES YES YES YES YES
SSL encrypted traffic inspectionYESYESYESYESYES
Bundled UTM Feature License Validity1 year 1 year 1year 1 year 1 year
Virtual Server Load BalancingYESYESYESYESYES
Built-in WiFi NO YES NO NO NO

For information on interface names by model, default port or interface name mapping, and default interface or zone mapping please see Section 3.3 on page 77.

See the product's datasheet for detailed information on a specific model.

1.2 Registration at myZyxel

myZyxel is Zyxel's online services center where you can register your Zyxel Device and manage subscription services available for your Zyxel Device (see Configuration > Licensing > Registration > Service for services available for your Zyxel Device).

  • For Zyxel Devices that already have firmware version 4.25 or later, you have to register your Zyxel Device and activate the corresponding service at myZyxel (through your Zyxel Device).
  • For Zyxel Devices upgrading to firmware version 4.25 or later, you may skip registering your Zyxel Device and activating the corresponding service at myZyxel (through your Zyxel Device). However, it is highly recommended to at least register your Zyxel Device. At the time of writing, the Firmware Upgrade license providing Cloud Helper new firmware notifications, is free when you register your Zyxel Device.

Note: You need to create a myZyxel account at http://portal.myZyxel.com before you can register your device and activate the services at myZyxel.

You may need your Zyxel Device's serial number and LAN MAC address to register it at myZyxel. See the label at the back of the Zyxel Device's for details.

Figure 1 myZyxel Login
https://portal.myzyel.com/users/sign.uk ZYXEL myZyxel Easy register, easy access, easy manage A centrally managed portal for unlocking your business potential. j:/zyxel.com.tw ****** Remember Also Subscribe Sign Up / Forget Password / ReSend Confirmation 2.28.1 © 2017 Zyxel Communications Corp. All rights reserved.

1.2.1 Grace Period

SecuReporter and service licenses have a 15-day grace period after a license expires. Services will continue to work in this period during which you will receive notifications to renew your licenses. New licenses are valid for 1 year from the date of purchase.

1.2.2 Applications

These are some Zyxel Device application scenarios.

Security Router

Security includes a Stateful Packet Inspection (SPI) firewall.

Figure 2 Applications: Security Router Applications: Security Router
ZYXEL USGFLEX700-GB0101F - Security Router - 1

flowchart
graph TD
    A["DMZ"] --> B["Internet"]
    C["LAN"] --> B
    D["Warning icon"] --> E["Fire"]
    F["Warning icon"] --> G["No"]
    H["Warning icon"] --> I["S"]
    J["Warning icon"] --> K["Envelope"]
    L["Warning icon"] --> M["Alert"]

IPv6 Routing

The Zyxel Device supports IPv6 Ethernet, PPP, VLAN, and bridge routing. You may also create IPv6 policy routes and IPv6 objects. The Zyxel Device can also route IPv6 packets through IPv4 networks using different tunneling methods.

Figure 3 Applications: IPv6 Routing
ZYXEL USGFLEX700-GB0101F - IPv6 Routing - 1

flowchart
graph TD
    A["DMZ"] --> B["Router"]
    C["LAN"] --> B
    B --> D["IPv6"]
    B --> E["IPv4"]

VPN Connectivity

Set up VPN tunnels with other companies, branch offices, telecommuters, and business travelers to provide secure access to your network. AS is an Authentication Server in the below figure.

Figure 4 Applications: VPN Connectivity
ZYXEL USGFLEX700-GB0101F - VPN Connectivity - 1

flowchart
graph TD
    A["Internet"] --> B["AS"]
    A --> C["LAN"]
    B --> D["Client Devices"]
    C --> E["Client Devices"]
    style A fill:#f9f,stroke:#333
    style B fill:#bbf,stroke:#333
    style C fill:#bfb,stroke:#333

SSL VPN Network Access

SSL VPN lets remote users use their web browsers for a very easy-to-use VPN solution. A user just browses to the Zyxel Device's web address and enters his user name and password to securely connect to the Zyxel Device's network. Here full tunnel mode creates a virtual connection for a remote user and gives him a private IP address in the same subnet as the local network so he can access network resources in the same way as if he were part of the internal network.

Figure 5 SSL VPN With Full Tunnel Mode
ZYXEL USGFLEX700-GB0101F - SSL VPN Network Access - 1

flowchart
graph LR
    A["User"] -->|https://| B["Internet"]
    B --> C["Web Mail File Share"]
    C --> D["Application Server"]
    D --> E["Web-based Application"]
    E --> F["Web Mail File Share"]
    style A fill:#f9f,stroke:#333
    style B fill:#ccf,stroke:#333
    style C fill:#cfc,stroke:#333
    style D fill:#fcc,stroke:#333
    style E fill:#cff,stroke:#333
    style F fill:#ffc,stroke:#333

User-Aware Access Control

Set up security policies to restrict access to sensitive information and shared resources based on the user who is trying to access it. In the following figure user A can access both the Internet and an internal file server. User B has a lower level of access and can only access the Internet. User C is not even logged in, so and cannot access either the Internet or the file server.

Figure 6 Applications: User-Aware Access Control
ZYXEL USGFLEX700-GB0101F - User-Aware Access Control - 1

flowchart
graph TD
    A["User A"] -->|Data Flow| B["Server"]
    B -->|Data Flow| C["User C"]
    C -->|Data Flow| B
    B -->|Data Flow| D["Global Internet"]
    style A fill:#f9f,stroke:#333
    style B fill:#ccf,stroke:#333
    style C fill:#cfc,stroke:#333
    style D fill:#fcc,stroke:#333

Load Balancing

Set up multiple connections to the Internet on the same port, or different ports, including cellular interfaces. In either case, you can balance the traffic loads between them.

Figure 7 Applications: Multiple WAN Interfaces
ZYXEL USGFLEX700-GB0101F - Load Balancing - 1

flowchart
graph TD
    A["Internet"] --> B["LAN"]
    A --> C["DMZ"]
    B --> D["Computer 1"]
    B --> E["Computer 2"]
    C --> F["Computer 3"]
    C --> G["Computer 4"]
    D --> H["Wireless Device"]
    E --> I["Wireless Device"]
    F --> J["Wireless Device"]
    G --> K["Wireless Device"]

1.3 Management Overview

You can manage the Zyxel Device in the following ways.

Web Configurator

The Web Configurator allows easy Zyxel Device setup and management using an Internet browser. This User's Guide provides information about the Web Configurator.

Figure 8 Managing the Zyxel Device: Web Configurator
ZYXEL USG FLEX 500 General Advanced Threat Protection CPU Usage 29 % Memory Usage 28 % Fosh Usage 10 % USB Storage Usage 0/0 KB Active Sessions 142/1000000 DHCP Tools 0 Device HA 0 Switch Counter Number of Login Users 1 Virtual Device ZYXEL USB FLEX ZyRx Statistics Device Information System Name: xy0fxx500 Serial Number: 516246590102 MAC Address Range: 848C/A31372F4 - 888C/A81872F8 Network Version: V4.50A46U.0J6C / C077-12-11-18-04-54 System Status Boot Status: OK System Update: 0428:61 Current Data/Time: 2000.02.24 / 07:43:28 UTC=40.00 Tx/Rx Statistics Port Selection: P1 Mines: —% —% —%

Command-Line Interface (CLI)

The CLI allows you to use text-based commands to configure the Zyxel Device. Access it using remote management (for example, SSH or Telnet) or via the physical or Web Configurator console port. See the Command Reference Guide for CLI details. The default settings for the console port are:

Table 2 Console Port Default Settings

SETTING VALUE
Speed 115200 bps
Data Bits 8
Parity None
Stop Bit 1
Flow Control Off

FTP

Use File Transfer Protocol for firmware upgrades and configuration backup or restore.

SNMP

The device can be monitored and/or managed by an SNMP manager. See Section 42.11 on page 883.

CloudCNM

Use the CloudCNM screen (see Section 42.16 on page 895) to enable and configure management of the Zyxel Device by a Central Network Management system.

Management Authentication

Managers must be authenticated with a username and password, using one of:

  • Local Zyxel Device authentication
    • An external RADIUS server
  • An external LDAP server
  • Certificates

1.4 Web Configurator

In order to use the Web Configurator, you must:

  • Use one of the following web browser versions or later:
  • Microsoft Edge
  • Internet Explorer 10.x, 11.x
  • Chrome latest version (45 or above)
  • Firefox latest version (45 or above)
  • Safari latest version (9.0 or above)
  • Allow pop-up windows (blocked by default in some browsers)
  • Enable JavaScripts, Java permissions, and cookies

The recommended screen resolution is 1024 x 768 pixels.

Note: Screenshots and graphics in this book may differ slightly from your product due to differences in product features or Web Configurator brand style. Most screen shots in this guide come from the USG110 and USG60W.

1.4.1 Web Configurator Access

1 Make sure your Zyxel Device hardware is properly connected. See the Quick Start Guide.
2 In your browser go to http://192.168.1.1. By default, the Zyxel Device automatically routes this request to its HTTPS server, and it is recommended to keep this setting. The Login screen appears.

ZYXEL USG FLEX 500 Enter User Name/Password and click to login. Login

3 Type the user name (default: "admin") and password (default: "1234").

4 Click Login. After you log in for the first time using the default user name and password, you must change the default admin password in the Update Admin Info screen. Enter a new password of from 1 to 64 characters.

In Configuration > Object > User/ Group > Setting, you can enable Password Complexity to require a new password to consist of at least 8 characters and at most 64, where at least 1 character must be a number, at least 1 a lower case letter, at least 1 an upper case letter and at least 1 a special character from the keyboard, such as !@#\$%^&*()_. +. You can also require periodic changing of the password in that screen by configuring Password must changed every (days).

Make a note of your new password, enter it in the following screen, then click Apply.

5 A Terms of Use screen displays. Read the statement, then click Acknowledge to proceed.

Note: If you are using an Internet Explorer browser, the Terms of Use will be downloaded automatically.

Terms of Use The privacy statement explains what data Zyxel will collect from you and how the data will be used. This is important for you so please take time to read it carefully. Thank you. Applicability of Privacy Policy Zyxel, a world leading service provider, is devoted to provide multifaceted privacy protections to our Users ("You or you") while you are enjoying our excellent products or services. We therefore offer you this Privacy Policy ("Policy") in order to sufficiently address our protection to your personal information. We hope you may spare your time to read through this Policy for a better understanding to your rights of personal information. Information We Collect ✓ I have read and understand the Information and terms in accordance with the Zyxel Privacy Statement. Acknowledge

6 The Network Risk Warning screen displays any unregistered or disabled security services. If your Zyxel Device is not registered, you will see a prompt to register it. Select how often to display the screen and click OK.

Network Risk Warning Your device is not registered! Registrating your device is prerequisite for activation security services and for receiving notifications when new firmware is available. Register Now Your network has potential security risk due to following malware protection features disabled or unlicensed. To provide continuous security protection of your network, please activate license and features listed below. Service Status Web Security Not Licensed Buy Application Security Not Licensed Buy Malware Blocker Not Licensed Buy Intrusion Prevention Not Licensed Buy Geo Enforcer Not Licensed Buy Security Policy Control Disabled Please remind me: every time OK

If you select Never and you later want to bring this screen back, use these commands (note the space before the underscore).

Router> enable
Router#
Router# configure terminal
Router(config)#
Router(config)# service-register _setremind
after-10-days
after-180-days
after-30-days
every-time
never
Router(config)# service-register _setremind every-time
Router(config)#

See the Command Line Interface (CLI) Reference Guide (RG) for details on all supported commands.

7 Follow the directions in the Update Admin Info screen. If you change the default password, the Login screen appears after you click Apply. If you click Ignore, the Installation Setup Wizard opens if the ZyWALL is using its default configuration; otherwise the dashboard appears.

1.4.2 Web Configurator Screens Overview

The Web Configurator screen is divided into these parts:

  • A – title bar
  • B – navigation panel
  • C - main window

Figure 9 Web Configurator Screen Overview
ZYXEL USG FLEX 500 General Advanced Threat Protection CPU Usage 29 % Memory Usage 25 % Flash Usage 10 % USB Storage Usage 0/D MB Active Sessions 142/1000000 DHCP Table 0 Host(s) Device HA 0 Switch Counter Number of Login Users 1 Current Login User Virtual Device ZYXEL USG FLEX ZYXA-L Security Device Information System Name usgflex500 Serial Number S162L45210122 MAC Address Range B8:EC:A3:13:72:F4 ~ B8:EC:A3:13:72:F8 Firmware Version V4.50(A5UJ.0)b2 / 2019-12-17 18:06:56 System Status Boot Status OK System Uptime 04:28:51 Current Date/Time 2020-02-06 / 07:43:27 UTC+00:00 Tx/Rx Statistics Port Selection: P1 Mbps Tx Rx

Title Bar

Figure 10 Title Bar
ZYXEL USGFLEX700-GB0101F - Title Bar - 1

natural_image Row of blue circular icons representing media and information services (no text or symbols)

The title bar icons in the upper right corner provide the following functions.

Table 3 Title Bar: Web Configurator Icons

LABEL DESCRIPTION
SecuReporter Clickthis to open the SecuReporter portal page.This icon shows when the Zyxel Device is added to an organization.
Web ConsoleClick this to open one or multiple console windows from which you can run command line interface (CLI) commands. You will be prompted to enter your user name and password. See the Command Reference Guide for information about the commands-currenting in to the Zyxel Device with HTTPS, so you can open one or multiple console windows.
CLIClick this to open a popup window that displays the CLI commands sent by the Web Configurator to the Zyxel Device.
ReferenceClick this to check which configuration items reference an object.
Site MapClick this to see an overview of links to the Web Configurator screens.
ForumGo to https://businessforum.zyxel.com for product discussions.
Help Click this to open the help page for the current screen.
AboutClick this to display basic information about the Zyxel Device.
Logout Click this to log out of the Web Configurator.

About

Click About to display basic information about the Zyxel Device.

Figure 11 About
Z About USG FLEX 500 Current Version: V4.50[ABUJ.0]b4s1 Released Date: 2020-03-13 23:56:10 Did you check www.zyxel.com today? Privacy Policy OK

Table 4 About

LABEL DESCRIPTION
Current Version This shows the firmware version of the Zyxel Device.
Released DateThis shows the date (yyyy-mm-dd) and time (hh:mm:ss) when the firmware is released.
OK Click this to close the screen.

Site Map

Click Site MAP to see an overview of links to the Web Configurator screens. Click a screen's link to go to that screen.

Figure 12 Site Map
Site Map Monitor System Status Port Statistics Interface Status Traffic Statistics Session Monitor Login Users IGMP Statistics DDNS Status IP/MAC Binding Cellular Status UPnP Port Status USB Storage Ethernet Neighbor FQDN Object Wireless AP Information ZyMesh SSID Info Station Info Detected Device VPN Monitor IPSec SSL L2TP over IPSec Configuration Maintenance

Web Console

Click Web Console to open one or multiple console windows from which you can run CLI commands. You will be prompted to enter your user name and password. See the Command Reference Guide for information about the commands. Logging in to the Zyxel Device with HTTPS, so you can open one or multiple console windows.

Figure 13 Web Console Window
web-console-login (stp100) Not secure | https://172.31.0.25/webconsole/ Username:

Reference

Click Reference to open the Reference screen. Select the type of object and the individual object and click Refresh to show which configuration settings reference the object.

Figure 14 Reference
References Type: Please select one Name: Please select one Service Priority Name Description Page of 0 Show 50 items No data to display Refresh Cancel

The fields vary with the type of object. This table describes labels that can appear in this screen.

Table 5 Reference

LABEL DESCRIPTION
Type Select anobject type to see the services.
NameThis identifies the object for which the configuration settings that use it are displayed. Click the object's name to display the object's configuration screen in the main window.
# This field is a sequential value, and it is not associated with any entry.
ServiceThis is the type of setting that references the selected object. Click a service's name to display the service's configuration screen in the main window.
PriorityIf it is applicable, this field lists the referencing configuration item's position in its list, otherwise N/A displays.
NameThis field identifies the configuration item that references the object.
DescriptionIf the referencing configuration item has a description configured, it displays here.
Refresh Click this to update the information in this screen.
CancelClick Cancel to close the screen.

CLI Messages

Click CLI to look at the CLI commands sent by the Web Configurator. Open the pop-up window and then click some menus in the Web Configurator to display the corresponding commands.

Figure 15 CLI Messages
[6] show users all [7] show users current [8] show app-watch-dog config [9] show usb-storage [10] show sa counter [11] show service-register status sslvpn-status CLI End Cancel

1.4.3 Navigation Panel

Use the navigation panel menu items to open status and configuration screens. Click the arrow in the middle of the right edge of the navigation panel to hide the panel or drag to resize it. The following sections introduce the Zyxel Device's navigation panel menus and their screens.

Figure 16 Navigation Panel
MAINTENANCE File Manager - Diagnostics - Packet Flow Explore - Shutdown

Dashboard

The dashboard displays general device information, system status, system resource usage, licensed service status, and interface status in widgets that you can re-arrange to suit your needs. See the Web Help for details on the dashboard.

Monitor Menu

The monitor menu screens display status and statistics information.

Table 6 Monitor Menu Screens Summary

FOLDER OR LINK TAB FUNCTION
System Status
Port StatisticsPort StatisticsDisplays packet statistics for each physical port.
Interface Status Interface SummaryDisplays general interface information and packet statistics.
Traffic Statistics Traffic StatisticsCollect and display traffic statistics.
Session Monitor Session MonitorDisplays the status of all current sessions.
Login UsersLogin UsersLists the users currently logged into the Zyxel Device.
Dynamic Guest Dynamic GuestList the dynamic guest accounts in the Zyxel Device's local database. These are accounts that are created automatically and allowed to access the Zyxel Device's services for a certain period of time.
IGMP Statistics IGMP StatisticsCollect and display IGMP statistics.
DDNS StatusDDNS StatusDisplays the status of the Zyxel Device's DDNS domain names.
IP/MAC Binding IP/MAC BindingLists the devices that have received an IP address from Zyxel Device interfaces using IP/MAC binding.
Cellular Status Cellular StatusDisplays details about the Zyxel Device's mobile broadband connection status.
UPnP Port StatusPort StatisticsDisplays details about UPnP connections going through the Zyxel Device.
USB Storage Storage InformationDisplays details about USB device connected to the Zyxel Device.
Ethernet NeighborEthernet NeighborView and manage the Zyxel Device's neighboring devices via Smart Connect (Layer Link Discovery Protocol (LLDP)). Use the Zyxel One Network (ZON) utility to view and manage the Zyxel Device's neighboring devices via the Zyxel Discovery Protocol (ZDP).
FQDN Object FQDN ObjectDisplays FQDN (Fully Qualified Domain Name) object cache lists used in DNS queries.
Wireless
AP InformationAP ListLists APs managed by the Zyxel Device.
Radio ListLists wireless details of APs managed by the Zyxel Device.
Built-in APDisplays associated wireless client usage and number. (For Zyxel Device model names containing 'W'.)
Top N APsLists managed APs with the most wireless traffic usage and most associated wireless stations.
Single APLists APs wireless traffic usage and associated wireless stations for a managed AP.
FOLDER OR LINKTAB FUNCTION
ZyMesh ZyMesh Link InfoDisplay statistics about ZyMesh wireless connections between managed APs.
SSID InfoSSID InfoDisplay information about the AP's wireless clients.
Station InfoStation ListLists wireless clients associated with the APs managed by the Zyxel Device.
Top N StationsLists wireless stations with the most wireless traffic usage.
Single StationLists wireless traffic usage for an associated wireless station.
Detected DeviceDetected DeviceDisplay information about suspected rogue APs.
Printer StatusPrinter StatusDisplay information about the connected statement printers.
VPN Monitor
IPSec IPSec Displays and manages the active IPSec SAs.
SSLSSLLists users currently logged into the VPN SSL client portal. You can also log out individual users and delete related session information.
L2TP over IPSec L2TP over IPSecDisplays details about current L2TP sessions.
Security Statistics
App Patrol Summary Displays application patrol statistics.
Content FilterSummaryCollect and display content filter statistics
Anti-MalwareSummaryCollect and display statistics on the malware that the Zyxel Device has detected.
Reputation FilterSummaryDisplays counts and URLs that are blocked by the Zyxel Device.
IDPSummaryCollect and display statistics on the intrusions that the Zyxel Device has detected.
Email SecuritySummaryCollect and display spam statistics.
StatusDisplays how many mail sessions the ZyWALL is currently checking and DNSBL (Domain Name Service-based spam Black List) statistics.
SSL InspectionReportCollect and display SSL Inspection statistics.
Certificate Cache ListDisplays traffic to destination servers using certificates.
LogView LogLists log entries.
View AP LogLists AP log entries.
Dynamic Users LogLists the Zyxel Device's dynamic guest account log messages.

Configuration Menu

Use the configuration menu screens to configure the Zyxel Device's features.

Table 7 Configuration Menu Screens Summary

FOLDER OR LINKTABFUNCTION
Quick SetupQuickly configure WAN interfaces or VPN connections.
Licensing
RegistrationRegistrationRegister the device and activate trial services.
Service View the licensed service status and upgrade licensed services.
Signature UpdateSignature Update signatures immediately or by a schedule.
Wireless
Built-in APGeneralAllow WiFi clients to access your Zyxel Device wirelessly to connect to the network.
ControllerConfigurationConfigure manual or automatic controller registration.
AP ManagementMgmt AP ListEdit or remove entries in the lists of APs managed by the Zyxel Device.
AP PolicyConfigure the AP controller's IP address on the managed APs and determine the action the managed APs take if the current AP controller fails.
AP Group Create groups of APs, define their radio, VLAN, port and load balancing settings.
Firmware Update the firmware on APs connected to your Zyxel Device.
Rogue AP Rogue/Friendly AP ListConfigure how the Zyxel Device monitors rogue APs.
Auto HealingAuto HealingEnable auto healing to extend the wireless service coverage area of the managed APs when one of the APs fails.
RTLS Real Time Location SystemUse the managed APs as part of an Ekahau RTLS to track the location of Ekahau WiFi tags.
Network
Interface PortPort Role/Port ConfigurationUse this screen to set the Zyxel Device's flexible ports such as LAN, OPT, WLAN, or DMZ.
EthernetManage Ethernet interfaces and virtual Ethernet interfaces.
PPPCreate and manage PPPoE and PPTP interfaces.
CellularConfigure a cellular Internet connection for an installed mobile broadband card.
TunnelConfigure tunneling between IPv4 and IPv6 networks.
VLANCreate and manage VLAN interfaces and virtual VLAN interfaces.
BridgeCreate and manage bridges and virtual bridge interfaces.
VTIConfigure IP address assignment and interface parameters for VTI (Virtual Tunnel Interface).
TrunkCreate and manage trunks (groups of interfaces) for load balancing.
RoutingPolicy RouteCreate and manage routing policies.
Static RouteCreate and manage IP static routing information.
RIPConfigure device-level RIP settings.
OSPFConfigure device-level OSPF settings, including areas and virtual links.
BGPConfigure exchange of Border Gateway Protocol (BGP) information over an IPSec tunnel.
DDNSDDNSDefine and manage the Zyxel Device's DDNS domain names.
NATNATSet up and manage port forwarding rules.
Redirect ServiceRedirect ServiceSet up and manage HTTP and SMTP redirection rules.
ALGALGConfigure SIP, H.323, and FTP pass-through settings.
UPnPUPnPConfigure interfaces that allow UPnP and NAT-PMP connections.
IP/MAC BindingSummaryConfigure IP to MAC address bindings for devices connected to each supported interface.
Exempt ListConfigure ranges of IP addresses to which the Zyxel Device does not apply IP/MAC binding.
Layer 2 IsolationGeneralEnable layer-2 isolation on the Zyxel Device and the internal interfaces.
White List Enable andconfigure the white list.
DNS Inbound LBDNS Load BalancingConfigure DNS Load Balancing.
VPN
IPSec VPN VPN Connection Configure IPSec tunnels.
SSL VPNAccess PrivilegeConfigure SSL VPN access rights for users and groups.
Global SettingConfigure the Zyxel Device's SSL VPN settings that apply to all connections.
L2TP VPNL2TP VPNConfigure L2TP over IPSec tunnels.
BWMBWMEnable and configure bandwidth management rules.
Web AuthenticationWeb Authentication General/Authentication Type/Custom Web Portal File/Custom User Agreement File/Facebook WiFiDefine a web portal and exempt services from authentication.
SSOConfigure the Zyxel Device to work with a Single Sign On agent.
Hotspot
BillingGeneralConfigure the general billing settings, such as the accounting method.
Billing ProfileConfigure the billing profiles for the web-based account generator and each button on the connected statement printer.
DiscountConfigure discount price plans.
Payment Service Enable online payment service and configure the service pages.
Printer ManagerGeneralConfigure the printer list, enable printer management and customize the account printout.
Printout ConfigurationDetect the connected statement printers, change their IP addresses and/or add them to the managed printer list.
Free TimeFree TimeAllow users to get a free account for Internet surfing during the specified time period.
IPnPIPnPEnable IPnP on the Zyxel Device and the internal interfaces.
Walled GardenWalled Garden General/URL Base/Domain/IP BaseCreate walled garden links that display in the login screen.
AdvertisementAdvertisementEnable and set advertisement links.
Security Policy
Policy ControlPolicyCreate and manage level-3 traffic rules and apply Security Service profiles.
ADP General Displayplay and manage ADPbindings.
Profile Create and manage ADP profiles.
Session ControlSession ControlLimit the number of concurrent client NAT/security policy sessions.
Security Service
AppPatrolProfileManage different types of traffic in this screen. Create App Patrol template(s) of settings to apply to a traffic flow using a security policy.
Content FilterProfileCreate and manage the detailed filtering rules for content filtering profiles and then apply to a traffic flow using a security policy.
Trusted Web SitesCreate a list of allowed web sites that bypass content filtering policies.
Forbidden Web SitesCreate a list of web sites to block regardless of content filtering policies.
Anti-MalwareAnti-MalwareEnable, specify actions to take when encountering malware or compressed files, and set up a black list to identify files with malware file patterns and a white list to identify files that should not be checked for malware.
Black/White ListSet up a black list to identify spam and a white list to identify legitimate email.
SignatureSearch for particular signatures to get more information about them.
Reputation FilterURL Threat FilterGeneral/White List/Black ListEnable URL filtering and specify what action the Zyxel Device takes when a access attempt to a blocked website is detected.You can also set up a white list to identify which IPv4 addresses and/or URLs should be allowed, and a black list to identify which IPv4 addresses and/or URLs should be blocked.
IDPIDPEnable and configure IDP settings. Create, import, or export custom signatures.
White List
Email Security SSL InspectionEmail SecurityTurn email security on or off and manage email security policies. Create email security templates of settings to apply to a traffic flow using a security policy.
Black/White ListSet up a black list to identify spam and a white list to identify legitimate email.
ProfileDecrypt HTTPS traffic for Security Service inspection. Create SSL Inspection templates of settings to apply to a traffic flow using a security policy.
Exclude ListConfigure services to be excluded from SSL Inspection.
Certificate UpdateUse this screen to update the latest certificates of servers using SSL connections to the Zyxel Device network.
IP ExceptionIP ExceptionUse this screen to view the IP exception list for the anti-malware and IDP (Intrusion, Detection, and Prevention) features.The Zyxel Device will not intercept nor inspect the incoming packets that match the rules in the IP exception list for the anti-malware and/or IDP (Intrusion, Detection, and Prevention) features.
Object
ZoneZoneConfigure zone templates used to define various policies.
FOLDER OR LINK TABFUNCTION
User/Group UserCreate and manage users.
Group Create and manage groups of users.
SettingManage default settings for all users, general settings for user sessions, and rules to force user authentication.
MAC Address Configure the MAC addresses of wireless clients for MAC authentication using the local user database.
AP ProfileRadioCreate templates of radio settings to apply to policies as an object.
SSIDCreate templates of wireless settings to apply to radio profiles or policies as an object.
MON ProfileMON ProfileCreate and manage rogue AP monitoring files that can be associated with different APs.
ZyMesh Profile ZyMesh Profile Create and manage ZyMesh files that can be associated with different APs.
Address/Geo IPAddressCreate and manage host, range, and network (subnet) addresses.
Address Group Create and manage groups of addresses to apply to policies as a single objects.
Geo IPUpdate the database of country-to-IP address mappings and manually configure country-to-IP address mappings for geographic address objects that can be used in security policies.
ServiceServiceCreate and manage TCP and UDP services.
Service GroupCreate and manage groups of services to apply to policies as a single object.
ScheduleScheduleCreate one-time and recurring schedules.
Schedule Group Create and manage groups of schedules to apply to policies as a single object.
AAA ServerActive DirectoryConfigure the Active Directory settings.
LDAPConfigure the LDAP settings.
RADIUSConfigure the RADIUS settings.
Auth. MethodAuthentication MethodCreate and manage ways of authenticating users.
Two-factor AuthenticationConfigure SMS or email authentication to access a secured network behind the Zyxel Device via a VPN tunnel.
CertificateMy CertificatesCreate and manage the Zyxel Device's certificates.
Trusted CertificatesImport and manage certificates from trusted sources.
ISP AccountISP AccountCreate and manage ISP account information for PPPoE/PPTP interfaces.
DHCPv6RequestConfigure IPv6 DHCP request type and interface information.
LeaseConfigure IPv6 DHCP lease type and interface information.
Device HADevice HA StatusSee the license status for Device HA Pro, and see the status of the active and passive devices.
Device HA ProConfigure Device HA Pro global settings, monitored interfaces and synchronization settings.
View LogSee logs of the active and passive devices
FOLDER OR LINKTABFUNCTION
Cloud CNMSecuManagerEnable and configure management of the Zyxel Device by a Central Network Management system.
SecuReporterEnable SecuReporter logging and access the SecuReporter security analytics portal that collects and analyzes logs from your Zyxel Device in order to identify anomalies, alert on potential internal or external threats, and report on network usage.
System
Host NameHost NameConfigure the system and domain name for the Zyxel Device.
USB StorageSettingsConfigure the settings for the connected USB devices.
Date/TimeDate/TimeConfigure the current date, time, and time zone in the Zyxel Device.
Console SpeedConsole Speed Set the console speed.
DNSDNSConfigure the DNS server and address records for the Zyxel Device.
WWWService ControlConfigure HTTP, HTTPS, and general authentication.
Login PageConfigure how the login and access user screens look.
SSHSSHConfigure SSH server and SSH service settings.
TELNETTELNETConfigure telnet server settings for the Zyxel Device.
FTPFTPConfigure FTP server settings.
SNMPSNMPConfigure SNMP communities and services.
Auth. ServerAuth. ServerConfigure the Zyxel Device to act as a RADIUS server.
NotificationMail ServerConfigure a mail server with authentication to send reports and password expiration notification emails.
SMSEnable the SMS service to send dynamic guest account information in text messages and authorization for VPN tunnel access to a secured network.
Language LanguageSelect the Web Configurator language.
IPv6IPv6Enable IPv6 globally on the Zyxel Device here.
ZONZONUse the Zyxel One Network (ZON) utility to view and manage the Zyxel Device's neighboring devices via the Zyxel Discovery Protocol (ZDP).
Log & Report
Email Daily ReportEmail Daily ReportConfigure where and how to send daily reports and what reports to send.
Log SettingsLog SettingsConfigure the system log, email logs, and remote syslog servers.

Maintenance Menu

Use the maintenance menu screens to manage configuration and firmware files, run diagnostics, and reboot or shut down the Zyxel Device.

Table 8 Maintenance Menu Screens Summary

FOLDER OR LINKTABFUNCTION
File ManagerConfiguration FileManage and upload configuration files for the Zyxel Device.
Firmware ManagementView the current firmware version and upload firmware. Reboot with your choice of firmware.
Shell ScriptManage and run shell script files for the Zyxel Device.
FOLDER OR LINKTAB FUNCTION
DiagnosticsDiagnosticsCollectCollect on APFilesCollect diagnostic information.
Packet Capture Capture packets for analysis.
CPU/Memory StatusView CPU and memory usage statistics.
System LogConnect a USB device to the Zyxel Device and archive the Zyxel Device system logs to it here.
Network ToolIdentify problems with the connections. You can use Ping or Traceroute to help you identify problems.
Routing TracesConfigure traceroute to identify where packets are dropped for troubleshooting.
Wireless Frame CaptureCapture wireless frames from APs for analysis.
Packet Flow ExploreRouting Status Check how the Zyxel Device determines where to route a packet.
SNAT Status View a clear picture on how the Zyxel Device converts a packet's source IP address and check the related settings.
Shutdown ShShutdown Turn off the Zyxel Device.

1.4.4 Tables and Lists

Web Configurator tables and lists are flexible with several options for how to display their entries.

Click a column heading to sort the table's entries according to that column's criteria.

Figure 17 Sorting Table Entries by a Column's Criteria
Configuration Edit Remove Activate Inactivate Create Virtual Interface Object References Status Name IP Address Mask 1 sfp DHCP - 0.0.0.0 0.0.0.0 2 wan1 DHCP - 172.21.40.15 255.255.252.0 3 wan2 DHCP - 0.0.0.0 0.0.0.0 4 lan1 STATIC - 192.168.1.1 255.255.255.0 5 lan2 STATIC - 192.168.2.1 255.255.255.0 6 dmz STATIC - 192.168.3.1 255.255.255.0 7 reserved STATIC - 0.0.0.0 0.0.0.0 Page 1 of 1 Show 50 Items Displaying 1 - 7 of 7

Click the down arrow next to a column heading for more options about how to display the entries. The options available vary depending on the type of fields in the column. Here are some examples of what you can do:

  • Sort in ascending or descending (reverse) alphabetical order
  • Select which columns to display
    • Group entries by field

• Show entries in groups
- Filter by mathematical operators (<, >, or =) or searching for text

Figure 18 Common Table Column Options
Configuration Edit Remove Activate Inactivate Create Virtual Interface Object References Status Name IP Address Mask 1 sfp Sort Ascending 0.0.0.0 2 wan1 Sort Descending 0.15 255.255.252.0 3 wan2 Columns 0.0.0.0 4 lon1 Group By This Field 255.255.255.0 5 lon2 Show in Groups 255.255.255.0 6 dmz Filters 255.255.255.0 7 reserved 0.0.0.0 Page 1 of 1 Show 50 items Displaying 1 - 7 of 7

Select a column heading cell's right border and drag to re-size the column.

Figure 19 Resizing a Table Column
Configuration Edit Remove Activate Inactivate Create Virtual Inter Status Name Address 1 sfp DHCP - 0.0.0.0

Select a column heading and drag and drop it to change the column order. A green check mark displays next to the column's title when you drag the column to a valid new location.

Figure 20 Moving Columns
Configuration Edit Remove Activate Inactivate Create Virtual Inter Name Status IP Address 1 sfp DHCP -- 0.0.0.0 2 wan1 Name - 172.21.40.15 3 wan2 DHCP -- 0.0.0.

Use the icons and fields at the bottom of the table to navigate to different pages of entries and control how many entries display at a time.

Figure 21 Navigating Pages of Table Entries
7 reserved STATIC - 0.0.0.0 0.0.0.0 Page 1 of 1 Show 50 Items Displaying 1 / 7 of 7

The tables have icons for working with table entries. You can often use the [Shift] or [Ctrl] key to select multiple entries to remove, activate, or deactivate.

Figure 22 Common Table Icons
Add Edit Remove Activate Inactivate Connect Disconnect References Move Status Name Base Interface Account Profile Page 0 of 0 Show 50 items No data to display

Here are descriptions for the most common table icons.

Table 9 Common Table Icons

LABEL DESCRIPTION
AddClick this to create a new entry. For features where the entry's position in the numbered list is important (features where the Zyxel Device applies the table's entries in order like the security policy for example), you can select an entry and click Add to create a new entry after the selected entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings. In some tables you can just click a table entry and edit it directly in the table. For those types of tables small red triangles display for table entries with changes that you have not yet applied.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
ConnectTo connect an entry, select it and click Connect.
DisconnectTo disconnect an entry, select it and click Disconnect.
ReferencesSelect an entry and click References to check which settings use the entry.
MoveTo change an entry's position in a numbered list, select it and click Move to display a field to type a number for where you want to put that entry and press [ENTER] to move the entry to the number that you typed. For example, if you type 6, the entry you are moving becomes number 6 and the previous entry 6 (if there is one) gets pushed up (or down) one.

Working with Lists

When a list of available entries displays next to a list of selected entries, you can often just double-click an entry to move it from one list to the other. In some lists you can also use the [Shift] or [Ctrl] key to select multiple entries, and then use the arrow button to move them to the other list.

Figure 23 Working with Lists
Add Group Configuration Name: Description: (Optional) Member List Available === Object === ad-users ldap-users radius-users ua-users Member OK Cancel

CHAPTER 2

Initial Setup Wizard

2.1 Initial Setup Wizard Screens

When you log into the Web Configurator for the first time or when you reset the Zyxel Device to its default configuration, the Initial Setup Wizard screen displays. This wizard helps you configure Internet connection settings and activate subscription services.

Note: For Zyxel Devices that already have firmware version 4.25 or later, you have to register your Zyxel Device and activate the corresponding service at myZyxel (through your Zyxel Device).

This chapter provides information on configuring the Web Configurator's Initial Setup Wizard. See the feature-specific chapters in this User's Guide for background information.

  • Click the double arrow in the upper right corner to display or hide the help.
  • Click Logout to exit the Initial Setup Wizard or click Next to continue the wizard. Click Finish at the end of the wizard to complete the wizard.

Figure 24 Initial Setup Wizard
Initial Setup Wizard Initial Setup Wizard Connect to Internet (WAN) > Date and Time Settings > Register Device > Activate Service > Service Settings > Wireless Settings > Remote Management 1 2 3 4 5 6 7 Welcome Welcome to the Zyxel Initial Setup Wizard. To protect your network, this Wizard prompts you to register your Device and activate security service(s) at myZyxel first. Your Device must be able to connect with myZyxel. We will guide you to complete: - Connect to Internet(WAN) - Date and Time Settings - Register Device - Activate Service - Service Settings - Wireless Settings - Remote Management Click "Next" to start Exit Next >

2.1.1 Internet Access Setup - WAN Interface

Use this screen to set how many WAN interfaces to configure and the first WAN interface's type of encapsulation and method of IP address assignment.

The screens vary depending on the encapsulation type. Refer to information provided by your ISP to know what to enter in each field.

Note: Enter the Internet access information exactly as your ISP gave it to you. Leave a field blank if you don't have that information.

  • I have two ISPs: Select this option to configure two Internet connections. Leave it cleared to configure just one. This option appears when you are configuring the first WAN interface.
  • Encapsulation: Choose the Ethernet option when the WAN port is used as a regular Ethernet. Choose PPPoE, PPTP or L2TP for a dial-up connection according to the information from your ISP.
  • WAN Interface: This is the interface you are configuring for Internet access.
    • Zone: This is the security zone to which this interface and Internet connection belong.
  • IP Address Assignment: Select Auto if your ISP did not assign you a fixed IP address. Select Static if the ISP assigned a fixed IP address.

Figure 25 Internet Access
Initial Setup Wizard Connect to Internet (WAN) > Date and Time Settings > Register Device > Activate Service > Service Settings > Wireless Settings > Remote Management ISP Setting I have two ISPs Internet Access - First WAN Interface ISP Parameters Encapsulation: Ethernet IP Address Assignment First WAN Interface: wan1 Zone: WAN IP Address Assignment: Auto < Back Next >

2.1.2 Internet Access: Ethernet

This screen is read-only if you set the previous screen's IP Address Assignment field to Auto. If you set the previous screen's IP Address Assignment field to Static, use this screen to configure your IP address settings.

  • Encapsulation: This displays the type of Internet connection you are configuring.
  • First WAN Interface: This is the number of the interface that will connect with your ISP.
    • Zone: This is the security zone to which this interface and Internet connection will belong.
  • IP Address: Enter your (static) public IP address. Auto displays if you selected Auto as the IP Address Assignment in the previous screen.

The following fields display if you selected static IP address assignment.

- IP Subnet Mask: Enter the subnet mask for this WAN connection's IP address.

  • Gateway IP Address: Enter the IP address of the router through which this WAN connection will send traffic (the default gateway).
  • First / Second DNS Server: These fields display if you selected static IP address assignment. The Domain Name System (DNS) maps a domain name to an IP address and vice versa. Enter a DNS server's IP address(es). The DNS server is extremely important because without it, you must know the IP address of a computer before you can access it. The Zyxel Device uses these (in the order you specify here) to resolve domain names for VPN, DDNS and the time server. Leave the field as 0.0.0.0 if you do not want to configure DNS servers.

2.1.2.1 Possible Errors

  • Check that your cable connection is coming from the correct interface you're using for the WAN connection on the Zyxel Device.
  • Check that the interface is connected to the device you're using for Internet access such as a broadband router and that the router is turned on. The LED of the interface you're using for the WAN connection on the Zyxel Device should be orange.
  • If your Zyxel Device was not able to obtain an IP address, check that your Internet access information uses DHCP as the WAN connection type. If it fails again, check with your Internet service provider or administrator for correct WAN settings.
  • If your Zyxel Device was not able to use the IP address entered, check that you were given an IP address, subnet mask and gateway address as part of your Internet access information. Re-enter your IP address, subnet mask and gateway IP address exactly as given. If it fails again, check with your Internet service provider or administrator for correct IP address, subnet mask and gateway address and other WAN settings.

Figure 26 Internet Access: Ethernet Encapsulation
Initial Setup Wizard Connect to Internet (WAN) > Date and Time Settings > Register Device > Activate Service > Service Settings > Wireless Settings > Remote Management 1 2 3 4 5 6 7 Internet Access - First WAN Interface ISP Parameters Encapsulation: Ethernet IP Address Assignment First WAN Interface: wan1 Zone: WAN IP Address: 0,0,0,0 IP Subnet Mask: 255.255.255.0 Gateway IP Address: 0,0,0,0 First DNS Server: Second DNS Server: < Back Next >

2.1.3 Internet Access: PPPoE

2.1.3.1 ISP Parameters

- Type the PPPoE Service Name from your service provider. PPPoE uses a service name to identify and reach the PPPoE server. You can use alphanumeric and -_@\$./ characters, and it can be up to 64 characters long.

  • Authentication Type - Select an authentication protocol for outgoing connection requests. Options are:
  • Chap/PAP - Your Zyxel Device accepts either CHAP or PAP when requested by the remote node.
  • Chap - Your Zyxel Device accepts CHAP only.
  • PAP - Your Zyxel Device accepts PAP only.
    • MSCHAP - Your Zyxel Device accepts MSCHAP only.
  • MSCHAP-V2 - Your Zyxel Device accepts MSCHAP-V2 only.

- Type the User Name given to you by your ISP. You can use alphanumeric and -@\$./ characters, and it can be up to 31 characters long.

- Type the Password associated with the user name. Use up to 64 ASCII characters except the [] and ?. This field can be blank.

- Select Nailed-Up if you do not want the connection to time out. Otherwise, type the Idle Timeout in seconds that elapses before the router automatically disconnects from the PPPoE server.

2.1.3.2 WAN IP Address Assignments

  • WAN Interface: This is the name of the interface that will connect with your ISP.
    • Zone: This is the security zone to which this interface and Internet connection will belong.
  • IP Address: Enter your (static) public IP address. Auto displays if you selected Auto as the IP Address Assignment in the previous screen.
  • First / Second DNS Server: These fields display if you selected static IP address assignment. The Domain Name System (DNS) maps a domain name to an IP address and vice versa. Enter a DNS server's IP address(es). The DNS server is extremely important because without it, you must know the IP address of a computer before you can access it. The Zyxel Device uses these (in the order you specify here) to resolve domain names for VPN, DDNS and the time server. Leave the field as 0.0.0.0 if you do not want to configure DNS servers. If you do not configure a DNS server, you must know the IP address of a machine in order to access it.

2.1.3.3 Possible Errors

  • Check that you're using the correct PPPoE Service Name and Authentication Type.
  • Make sure that your Internet access information uses PPPoE as the WAN connection type. Re-enter your PPPoE user name and password exactly as given. If it fails again, check with your Internet service provider or administrator for correct WAN settings and user credentials.
  • If you were given an IP address and DNS server information as part of your Internet access information, re-enter them exactly as given. If it fails again, check with your Internet service provider or administrator for correct IP address, subnet mask and gateway address and other WAN settings.

Figure 27 Internet Access: PPPoE Encapsulation
Initial Setup Wizard Connect to Internet (WAN) > Date and Time Settings: > Register Device > Activate Service > Service Settings > Wireless Settings > 1 2 3 4 5 6 Internet Access - First WAN Interface ISP Parameters Encapsulation: PPPoE Service Name: (Optional) Authentication Type: Chap/PAP User Name: Password: Retype to Confirm: Naled-Up Idle timeout: 100 Seconds IP Address Assignment First WAN Interface: wan1_ppp Zone: WAN IP Address: 0,0,0,0 First DNS Server: Second DNS Server: < Back Next >

2.1.4 Internet Access: PPTP

2.1.4.1 ISP Parameters

- Authentication Type - Select an authentication protocol for outgoing calls. Options are:

  • Chap/PAP - Your Zyxel Device accepts either CHAP or PAP when requested by the remote node.
  • Chap - Your Zyxel Device accepts CHAP only.
  • PAP - Your Zyxel Device accepts PAP only.
    • MSCHAP - Your Zyxel Device accepts MSCHAP only.
  • MSCHAP-V2 - Your Zyxel Device accepts MSCHAP-V2 only.

  • Type the User Name given to you by your ISP. You can use alphanumeric and -@\$./ characters, and it can be up to 31 characters long.

  • Type the Password associated with the user name. Use up to 64 ASCII characters except the [] and ?. This field can be blank. Re-type your password in the next field to confirm it.
  • Select Nailed-Up if you do not want the connection to time out. Otherwise, type the Idle Timeout in seconds that elapses before the router automatically disconnects from the PPTP server.

2.1.4.2 PPTP Configuration

  • Base Interface: This identifies the Ethernet interface you configure to connect with a modem or router.
  • Type a Base IP Address (static) assigned to you by your ISP.
  • Type the IP Subnet Mask assigned to you by your ISP (if given).
  • Gateway IP Address: Enter the IP address of the router through which this WAN connection will send traffic (the default gateway).
  • Server IP: Type the IP address of the PPTP server.

- Type a Connection ID or connection name. It must follow the "c:id" and "n:name" format. For example, C:12 or N:My ISP. This field is optional and depends on the requirements of your broadband modem or router. You can use alphanumeric and -_: characters, and it can be up to 31 characters long.

2.1.4.3 WAN IP Address Assignments

  • First WAN Interface: This is the connection type on the interface you are configuring to connect with your ISP.
  • Zone This is the security zone to which this interface and Internet connection will belong.
  • IP Address: Enter your (static) public IP address. Auto displays if you selected Auto as the IP Address Assignment in the previous screen.
  • First / Second DNS Server: These fields display if you selected static IP address assignment. The Domain Name System (DNS) maps a domain name to an IP address and vice versa. Enter a DNS server's IP address(es). The DNS server is extremely important because without it, you must know the IP address of a computer before you can access it. The Zyxel Device uses these (in the order you specify here) to resolve domain names for VPN, DDNS and the time server. Leave the field as 0.0.0.0 if you do not want to configure DNS servers.

2.1.4.4 Possible Errors

  • Check that you're using the correct PPPT Service IP, Base IP Address, IP Subnet Mask, Gateway IP Address, Connection ID and Authentication Type.
  • Make sure that your Internet access information uses PPTP as the WAN connection type. Re-enter your PPTP user name and password exactly as given. If it fails again, check with your Internet service provider or administrator for correct WAN settings and user credentials.
  • If you were given an IP address and DNS server information as part of your Internet access information, re-enter them exactly as given. If it fails again, check with your Internet service provider or administrator for correct IP address, subnet mask and gateway address and other WAN settings.

Figure 28 Internet Access: PPTP Encapsulation
Initial Setup Wizard Connect to Internet (WAN) > Date and Time Settings > Register Device > Activate Service > Service Settings > Wireless Settings > 1 2 3 4 5 6 Internet Access - First WAN Interface ISP Parameters Encapsulation: PPTP Authentication Type: Chap/PAP User Name: ① Password: ① Retype to Confirm: ① □ Nailed-Up Idle timeout: 100 Seconds PPTP Configuration Base Interface: wan1 Base IP Address: 0.0.0.0 ① IP Subnet Mask: 255.255.255.0 Gateway IP Address: (Optional) Server IP: 0.0.0.0 ① IP Address Connection ID: (Optional) IP Address Assignment First WAN Interface: wan1_ppp Zone: WAN IP Address: 0.0.0.0 ① First DNS Server: Second DNS Server: < Back Next >

2.1.5 Internet Access: L2TP

2.1.5.1 ISP Parameters

  • Authentication Type - Select an authentication protocol for outgoing connection requests. Options are:
  • Chap/PAP - Your Zyxel Device accepts either CHAP or PAP when requested by the remote node.
    • Chap - Your Zyxel Device accepts CHAP only.
  • PAP - Your Zyxel Device accepts PAP only.
    • MSCHAP - Your Zyxel Device accepts MSCHAP only.
  • MSCHAP-V2 - Your Zyxel Device accepts MSCHAP-V2 only.
  • Type the User Name given to you by your ISP. You can use alphanumeric and -_@\$./ characters, and it can be up to 31 characters long.
  • Type the Password associated with the user name. Use up to 64 ASCII characters except the [] and ?. This field can be blank.
  • Select Nailed-Up if you do not want the connection to time out. Otherwise, type the Idle Timeout in seconds that elapses before the router automatically disconnects from the PPPoE server.

2.1.5.2 L2TP Configuration

- Base Interface: This identifies the Ethernet interface you configure to connect with a modem or router.

- Type a Base IP Address (static) assigned to you by your ISP.

  • IP Subnet Mask: Enter the subnet mask for this WAN connection's IP address.
  • Gateway IP Address: Enter the IP address of the router through which this WAN connection will send traffic (the default gateway).
  • Server IP: Type the IP address of the L2TP server.

2.1.5.3 WAN IP Address Assignments

  • WAN Interface: This is the name of the interface that will connect with your ISP.
    • Zone: This is the security zone to which this interface and Internet connection will belong.
  • IP Address: Enter your (static) public IP address. Auto displays if you selected Auto as the IP Address Assignment in the previous screen.

- First / Second DNS Server: These fields display if you selected static IP address assignment. The Domain Name System (DNS) maps a domain name to an IP address and vice versa. Enter a DNS server's IP address(es). The DNS server is extremely important because without it, you must know the IP address of a computer before you can access it. The Zyxel Device uses these (in the order you specify here) to resolve domain names for VPN, DDNS and the time server. Leave the field as 0.0.0.0 if you do not want to configure DNS servers.

2.1.5.4 Possible Errors

  • Check that you're using the correct L2PT Server IP, Subnet Mask, Gateway IP Address, IP Subnet Mask and Authentication Type.
  • Make sure that your Internet access information uses L2TP as the WAN connection type. Re-enter your L2TP user name and password exactly as given. If it fails again, check with your Internet service provider or administrator for correct WAN settings and user credentials.
  • If you were given an IP address and DNS server information as part of your Internet access information, re-enter them exactly as given. If it fails again, check with your Internet service provider or administrator for correct IP address, subnet mask and gateway address and other WAN settings.

Figure 29 Internet Access: L2TP Encapsulation
Initial Setup Wizard Connect to Internet (WAN) > Date and Time Settings > Register Device > Activate Service > Service Settings > Wireless Settings > 1 2 3 4 5 6 Internet Access - First WAN Interface ISP Parameters Encapsulation: L2TP Authentication Type: Chap/PAP User Name: 1 Password: 1 Retype to Confirm: 1 □ Nailed-Up Idle timeout: 100 Seconds Base Interface:wan1 Base IP Address: 0.0.0.0 IP Subnet Mask: 255.255.255.0 Gateway IP Address: (Optional) Server IP: 0.0.0.0 IP Address IP Address Assignment First WAN Interface:wan1_ppp Zone: WAN IP Address: 0.0.0.0 First DNS Server: Second DNS Server: < Back Next >

2.1.6 Internet Access Setup - Second WAN Interface

If you selected I have two ISPs, after you configure the First WAN Interface, you can configure the Second WAN Interface. The screens for configuring the second WAN interface are similar to the first (see Section 2.1.1 on page 51).

Figure 30 Internet Access: Step 3: Second WAN Interface
Initial Setup Wizard Initial Setup Wizard Connect to Internet (WAN) > Date and Time Settings > Register Device > Activate Service > Service Settings > Wireless Settings > Remote Management 1 2 3 4 5 6 7 Internet Access - Second WAN Interface ISP Parameters Encapsulation: Ethernet IP Address Assignment Second WAN Interface: wan2 Zone: WAN IP Address Assignment: Auto < Back Next >

2.1.7 Internet Access: Congratulations

You have set up your Zyxel Device to access the Internet. A screen displays with your settings. Click Connection Test to check that you can access the Internet. If you cannot, click Back and confirm that you entered the settings correctly. If you have, check that you got the correct settings from your ISP or network administrator.

Figure 31 Internet Access: Summary
Initial Setup Wizard Connect to Internet (WAN) > Date and Time Settings > Register Device > Activate Service > Service Settings > Wireless Settings : > 1 2 3 4 5 6 Congratulations. The Internet Access wizard is completed Summary of Internet Access configuration: First Setting Encapsulation: Ethernet First WAN Interface: wan1 Zone: WAN IP Address Assignment: Auto Second Setting Encapsulation: Ethernet Second WAN Interface: wan2 Zone: WAN IP Address Assignment: Auto Connection Text < Back Next >

2.1.8 Date and Time Settings

It's important to have correct date and time values in the logs. The Zyxel Device can automatically update the time and date by detecting your time zone and whether Daylight Savings is in effect in that time zone.

If your Zyxel Device cannot get the correct date and time, it may not able to connect to a time server. Check that the Zyxel Device has Internet access, then click Sync. Now.

Figure 32 Date and Time Settings
Initial Setup Wizard Connect to Internet (WAN) > Date and Time Settings > Register Device > Activate Service > Service Settings > Wireless Settings > Remote Management 1 2 3 4 5 6 7 Date and Time Settings For effective scheduling and logging, your Device system time must be accurate. The Device will get the current date and time from an external time server periodically by default. The auto-detection might temporary fail due to internet connection status, the Device will try to get date and time automatically when the internet connection is available. Current Date: 2018-01-25 Current Time: 02:50:53 UTC+00:00 Time Zone: (UTC+00:00) Greenwich Mean Time: Dublin, Edinburgh, Lisbon, London Daylight Saving Time is not observed by this time zone. Sync. Now < Back Next >

2.1.9 Register Device

Click the Register button in this screen to register your device at portal.myzyxel.com.

Note: The Zyxel Device must be connected to the Internet in order to register.

Figure 33 Register Device
Initial Setup Wizard Initial Setup Wizard Connect to Internet (WAN) > Date and Time Settings > Register Device > Activate Service > Service Settings > Wireless Settings > Remote Management 1 2 3 4 5 6 7 Register Device Refresh Registrating your device is prerequisite for receiving notifications when new firmware is available and for activation licenses. Device Registration Status: Not registered Register your device now Register Please ensure you have internet connectivity. Click "Register" to go to myZyxel to activate security licenses. Otherwise, press "Skip" to go to the next step. < Back Next > Skip

You may need the Zyxel Device's serial number and LAN MAC address to register it at myZyxel if you have not already done so. Refer to the label at the back of the Zyxel Device's for details.

Figure 34 myZyxel Login
ZYXEL Easy register, easy access, easy manage A centrally managed portal for unlocking your business potential. @zyxel.com.tw Remember We Submit Sign Up / Forget Password / Reend Confirmation 2017.8.2017 Zycel Communications Corp. All rights reserved.

Click Refresh or use the Configuration > Licensing > Registration screen to update your Zyxel Device registration status.

Figure 35 Registered Device
Connect to Internet (WAN) > Date and Time Settings > Register Device > Activate Service > Service Settings > Wireless Settings > Remote Management Register Device Refresh Registrating your device is prerequisite for receiving notifications when new firmware is available and for activation licenses. Device Registration Status: Registered < Back Next > Skip

2.1.10 Activate Service

After you register your Zyxel Device, you can register for the services supported by your model. See Subscription Services Available on page 196 for more information on the subscription services for the two types of security packs.

Here are the services available for the Zyxel Device.

  • Web Filtering (CF): access a database that can block websites by category.
  • IPS (IDP): use this feature to detect Intrusion Detection and Prevention attacks.
  • Application Patrol: use signatures for Application Patrol inspection to manage the use of various applications on the network.
  • Anti-Malware: use signatures to detect malware patterns in files.
  • Email Security (Anti-Spam): use anti-spam signatures to mark or discard spam (unsolicited commercial or junk email).
  • SecuReporter: collect and analyze logs from your Zyxel Device in order to identify anomalies, notify you of potential internal or external threats, and report on network usage.

Figure 36 USG FLEX 500 Activate Service
Initial Setup Wizard Connect to Internet (WAN) > Date and Time Settings > Register Device > Activate Service > Service Settings > Wireless Settings > Remote Management 1 2 3 4 5 6 7 Activate Service Service License Status Refresh Service Status Web Filtering(CF) Activated IPS(IDP) Activated Application Patrol Activated Anti-Malware Activated Email Security(Anti-Spam) Activated SecuReporter Activated < Back Next > Skip

Click Refresh and wait a few moments for the registration information to update in this screen. If the page does not refresh, make sure the Internet connection is working and click Refresh again. To check your Internet connection, try to access the Internet from a computer connected to a LAN port on the Zyxel Device. If you cannot, then check your Internet access settings on the Zyxel Device.

2.1.11 Service Settings

You can enable or disable the following features in this screen. This screen varies depending on the security pack that you purchase. See Subscription Services Available on page 196 for more information on the subscription services for the two types of security packs.

Note: Select the I have read SecuReporter GDPR and agree policy check box to have SecuReporter collect and analyze logs from this Zyxel Device. This check box won't appear again if you have already selected this before.

  • URL Threat Filter: Use this feature to detect and block access to specific URLs, by comparing URL addresses of sites that users attempt to access with a database of either permitted or blocked sites.
  • Anti-Malware: Use this feature to detect malware patterns in files.
  • IDP: Use this feature to detect Intrusion Detection and Prevention attacks.
  • Content Filter: Use this feature to access a database that can block websites by category.
  • App Patrol: Use this feature to manage the use of various applications on the network.
  • Email Security: Use this feature to mark or discard spam (unsolicited commercial or junk email).
  • SecuReporter: Use this feature to collect and analyze logs from your Zyxel Device in order to identify anomalies, notify you of potential internal or external threats, and report on network usage.

Figure 37 USG FLEX Service Settings
Initial Setup Wizard Connect to Internet (WAN) > Date and Time Settings > Register Device > Activate Service > Service Settings > Wireless Settings > Remote Management 1 2 3 4 5 6 7 Service Settings: URL Threat Filter: Enable (Recommended) Anti-Malware: Enable (Recommended) IDP: Enable (Recommended) Content Filter: None App Patrol: None Email Security: Disable SecuReporter: Enable □ I have read and accept the SecuReporter Terms of Use < Back Next >

2.1.12 Service Settings: SecuReporter

Use this screen to add the Zyxel Device to a new or existing organization, and choose the level of data protection for traffic going through this Zyxel Device.

  • Server Status: This is the connection status between the Zyxel Device and the SecuReporter server. This field shows Connected when the Zyxel Device can synchronize with the SecuReporter server. This field shows Timeout when the Zyxel Device can't synchronize with the SecuReporter server. This field shows Fail when the connection between the Zyxel Device and the SecuReporter server is down.
  • Device Name: Enter the name of the Zyxel Device. This Zyxel Device will be added to a new or existing organization.
  • Organization: This field appears if you haven't created an organization in the SecuReporter server. Type a name of up to 255 characters and description to create a new organization.
  • Select from existing organization: Select an existing organization from the drop-down list box to add the Zyxel Device to the selected organization.
  • Create new organization: Type a name of up to 255 characters and description to create a new organization.
  • Partially Anonymous: Select this and personal data, such as user names, MAC addresses, email addresses, and host names, will be replaced with artificial identifiers in downloaded logs.
  • Fully Anonymous: Select this and personal data, such as user names, MAC addresses, email addresses, and host names, will be replaced with anonymized information in downloaded logs.
  • Non-Anonymous: Select this and personal data, such as user names, MAC addresses, email addresses, and host names, will be identifiable in downloaded logs.

Figure 38 SecuReporter Settings
Initial Setup Wizard Initial Setup Wizard Connect to Internet (WAN) > Data and Time Settings > Register Device > Activate Service > Service Settings > Wireless Settings > Remote Management 1 2 3 4 5 6 7 SecuReporter Setting Server Status: Connected Device Names: ATP200_Fran Select from existing organization Organization: Org1 Create new organization Organization: Org1 Data Protection Policy Read the data protection policy and then choose the level of data protection for traffic going through this Zyxcel Device. Partially Anonymous Fully Anonymous Non-Anonymous Personal data [user names, MAC addresses, email addresses and host names] are replaced with artificial Identifiers in downloaded Archive Logs. Personal data can be removed from SecuReporter. Personal data [user names, MAC addresses, email addresses and host names] are replaced with anonymized Information in Analyzer, Reports, and downloaded Archive Logs. Data can no longer be traced back to individual people. Data [user names, MAC addresses, email addresses and host names] are clearly identifiable in Analyzer, Reports, and downloaded Archive Logs. Personal data cannot be removed from SecuReporter. < Back Next >

The following screen appears when the Zyxel Device is already added in an organization.

Figure 39 SecuReporter Settings
Initial Setup Wizard Initial Setup Wizard Connect to Internet (WAN) > Date and Time Settings > Register Device > Activate Service > Service Settings > Wireless Settings > Remote Management 1 2 3 4 5 6 7 SecuReporter Setting This device is already be added on SecuReporter. Server Status: Connected Device Name: ATP200_fran Organization: Org < Back Next >

2.1.13 Wireless Settings: Management Mode

The Management Mode screen appears for Zyxel Devices that have a built-in AP. Select Built-in AP if you want WiFi clients to access your Zyxel Device wirelessly. Select AP Controller to allow the Zyxel Device to manage APs in the same network as the Zyxel Device. Both modes cannot work simultaneously. Click Next to continue the wizard.

Figure 40 Wireless Setup Wizard > Management Mode (Models with Built-in AP)
Initial Setup Wizard Connect to Internet (WAN) > Date and Time Settings > Register Device > Activate Service > Service Settings > Wireless Settings > Remote Management Built-in AP AP Controller Note: After you change the operation mode, will auto disable other mode(Built-in AP/AP Controller) < Back Next >

2.1.14 Wireless Settings: AP Controller

The Zyxel Device can act as an AP Controller that can manage APs in the same network as the Zyxel Device. Select Yes if you want your Zyxel Device to manage APs in your network; otherwise select No.

Figure 41 Wireless Setup Wizard > Management Mode
Initial Setup Wizard Connect to Internet (NWW) > Date and Time Settings > Register Device > Achieve Service > Service Settings > Wireless Settings > Remote Management Do you like to enable AP Controller feature ? [Enable this feature ONLY when you manage to deploy USG RLEX 500 to control managed AP in your network] Yes No < Back Next >

2.1.15 Wireless Settings: SSID & Security

Configure SSID and wireless security in this screen.

SSID Setting

  • SSID - Enter a descriptive name of up to 32 printable characters for the wireless LAN.
  • Security Mode - Select Pre-Shared Key to add security on this wireless network. Otherwise, select None to allow any wireless client to associate this network without authentication.
  • Pre-Shared Key - Enter a pre-shared key of between 8 and 63 case-sensitive ASCII characters (including spaces and symbols) or 64 hexadecimal characters.

  • Hidden SSID - Select this option if you want to hide the SSID in the outgoing beacon frame. A wireless client then cannot obtain the SSID through scanning using a site survey tool.

  • Enable Intra-BSS Traffic Blocking - Select this option if you want to prevent crossover traffic from within the same SSID. Wireless clients can still access the wired network but cannot communicate with each other.

For Zyxel Devices with Built-in AP Only

Bridged to: Zyxel Devices with W in the model name have a built-in AP. Select an interface to bridge with the built-in AP wireless network. Devices connected to this interface will then be in the same broadcast domain as devices in the AP wireless network.

Figure 42 Wireless Settings: SSID & Security
Initial Setup Wizard Connect to Internet (WAN) > Date and Time Settings > Register Device > Activate Service > Service Settings > Wireless Settings > Remote Management Wireless Settings SSID Setting SSID: ZyXEL Security Mode ● Pre-Shared Key ○ None □ Hidden SSID ☑ Enable Intra-BSS Traffic blocking < Back Next>

2.1.16 Remote Management

Select this to allow access to the Zyxel Device using HTTP or HTTPS from the Internet.

Figure 43 Remote Management
Initial Setup Wizard Initial Setup Wizard Connect to Internet (WAN) > Date and Time Settings > Register Device > Activate Service > Service Settings > Wireless Settings > Remote Management 1 2 3 4 5 6 7 Remote Management □ Allow remote management and SSL VPN access from WAN < Back Finish

HTTPS is added to the Default_Allow_WAN_to_ZyWALL rule in Object > Service > Service Group screen when you enable Remote Management.

Figure 44 Object > Service > Service Group - HTTPS
Edit Service Group Rule Default_Allow_WAN_To_ZyWALL Configuration Name: Default_Allow_WAN_ Description: System Default Allow Configuration Available *** Object *** AIM AUTH Any_TCP Any_UDP BGP BONJOUR BOOTP_CLIENT BOOTP_SERVER Member *** Object *** AH ESP GPE HTTPS IKE NATT VRRP OK Cancel

CHAPTER 3

Hardware, Interfaces and

Zones

3.1 Hardware Overview

This section describes the front and rear panels for each model.

The following table summarizes the port features of the Zyxel Device by model.

Table 10 USG FLEX Series Port Comparison Table

USG FLEX MODELS USGFLEX 100 USG FLEX100W USG FLEX200 USG FLEX500 USG FLEX700
USB 3.0 Ports 1 1 2 2 2
1 Gbps SFP interface 1 1 11 2
10/100/1000 Mbps Ethernet WAN Ports1 1 2 --
10/100/1000 Mbps Ethernet Ports4 4 4 7 12
Console Port1 (RJ45)1 (RJ45)1 (DB9)1 (DB9)1 (DB9)

For information on interface names by model, default port or interface name mapping, and default interface or zone mapping please see Section 3.3 on page 77.

3.1.1 Front Panels

The LED indicators are located on the front panel.

Figure 45 USG FLEX 100 Front Panel
ZYXEL USG FLEX ZYWALL Security PWR SYS P1 WAN LAN/DMZ RESET P2 P3 P4 P5 P6 10/100/1000 USB

Figure 46 USG FLEX 100W Front Panel

ZYXEL USC FLEX ZYPAL Security PWR SYS 2.4G 5G SFP WAN LAN/DMZ P1 P2 P3 P4 P5 P6 RESET 10/100/1000 USB

Figure 47 USG FLEX 200 Front Panel
USG FLEX 2yWALL Security PWR SYS RESET USB 2 LINK ACT P1 WAN1 P2 WAN2 P3 P4 LAN/DMZ P5 P6 P7

Figure 48 USG FLEX 500 Front Panel

ZMXEL USG FLEX ZyWAIT Security PWR SYS RESET USB LINK ACT P1 F2 F3 F4 F5 F6 F7 F8 10/100/1000

Figure 49 USG FLEX 700 Front Panel

ZYXEL USGFLEX700-GB0101F - Front Panels - 5

The following table describes the front panel LEDs.

Table 11 LED Descriptions

LED COLOR STATUSDESCRIPTION
PWR Off The Zyxel Device is turned off.
Green OnThe Zyxel Device is turned on.
RedOnThere is a hardware component failure. Shut down the device, wait for a few minutes and then restart the device. If the LED turns red again, then please contact your vendor.
SYSGreenOffThe Zyxel Device is not ready or has failed.
On The Zyxel Device is ready and running.
Blinking TheZyxel Device is booting.
Red On The Zyxel Device has an error or has failed.
2.4GGreenOffThe 2.4G wireless interface is off.
On The 2.4G wireless interface is ready.
Blinking The2.4G wireless connection is active.
5GGreenOffThe 5G wireless interface is off.
On The 5G wireless interface is ready.
Blinking The5G wireless connection is active.
P1 (SFP)
LINKYellowOffThere is no connection on this port.
On This porthas a successful 1000 Mbps link.
GreenOffThere is no connection on this port.
On This porthas a successful 100 Mbps link.
ACTGreenOffThere is no traffic on this port.
BlinkingThe Zyxel Device is sending or receiving packets on this port at 100/1000 Mbps.
P2, P3...(WAN/LAN/DMZ)YellowOffThere is no connection on this port.
On This porthas a successful 1000 Mbps link.
BlinkingThe Zyxel Device is sending or receiving packets on this port at 1000 Mbps.
GreenOffThere is no connection on this port.
On This porthas a successful 10/100 Mbps link.
BlinkingThe Zyxel Device is sending or receiving packets on this port at 10/100 Mbps.

The following table describes the ports on the front panel.

Table 12 Front Panel Ports

LABEL DESCRIPTION
RESETPress the button in for about 5 seconds (or until theSYSLED starts to blink), then release it to return the Zyxel Device to the factory defaults (password is 1234, LAN IP address 192.168.1.1 and so on).
CONSOLEYou can use the console port to manage the Zyxel Device using CLI commands. You will be prompted to enter your user name and password. See the Command Reference Guide for more information about the CLI.When configuring using the console port, you need a computer equipped with communications software configured to the following parameters:Speed 115200 bpsData Bits 8Parity NoneStop Bit Flow Control Off
USBConnect a storage device for system logs (seeMaintenance > Diagnostics > System Log) and storage (seeConfiguration > System > USB Storage).
P2-P7 (USG FLEX 200)P2-P8 (USG FLEX 500)P1-P12 (USG FLEX 700)These are 1G RJ-45 Ethernet ports.

3.1.2 Rear Panels

The connection ports are located on the rear panel.

Figure 50 USG FLEX 100 Rear Panel
12V 2A POWER ON OFF P1 SFP CONSOLE P2 P3 P4 P5 P6 WAN LAN/ONZ

Figure 51 USG FLEX 100W Rear Panel
12V: 2A POWER ON OFF P1 SFP CONSOLE P2 P3 P4 P5 P6 WAN LAN/DMZ

Figure 52 USG FLEX 200 Rear Panel
CONSOLI 12V= 2.5A ON OFF POWER

Figure 53 USG FLEX 500 Rear Panel
CONSOLE 17V=4.17A POWER ON OFF

Figure 54 USG FLEX 700 Rear Panel

AC INPUT 100=240V-50/60Hz 2.5A MAX

Note: Make sure you connect the Zyxel Device's power cord to a socket-outlet with an earthing connection or its equivalent.

The following table describes the items on the rear panel.

Table 13 Rear Panel Items

LABEL DESCRIPTION
ConsoleYou can use the console port to manage the Zyxel Device using CLI commands. You will be prompted to enter your user name and password. See the Command Reference Guide for more information about the CLI.When configuring using the console port, you need a computer equipped with communications software configured to the following parameters:Speed 115200 bpsData Bits 8Parity NoneStop Bit1Flow Control Off
PowerUse the included power cord to connect the power socket to a power outlet. Turn the power switch on if your Zyxel Device has a power switch.
LockAttach a lock-and-cable from the Kensington lock (the small, metal-reinforced, oval hole) to a permanent object, such as a pole, to secure the Zyxel Device in place.
FanThe fans are for cooling the Zyxel Device. Make sure they are not obstructed to allow maximum ventilation.

Note: Use an 8-wire Ethernet cable to run your Gigabit Ethernet connection at 1000 Mbps. Using a 4-wire Ethernet cable limits your connection to 100 Mbps. Note that the connection speed also depends on what the Ethernet device at the other end can support.

3.2 Installation Scenarios

The Zyxel Device can be:

  • Placed on a desktop.
    • Wall-mounted on a wall.
  • Rack-mounted on a standard EIA rack.

The following table summarizes the installation scenarios of the Zyxel Device by model.

Table 14 USG FLEX Series Installation Comparison Table

USG FLEX MODELS USGFLEX 100 USGFLEX 100WUSG FLEX200 USG FLEX500 USG FLEX700
Rubber feet for desktop placementYesYesYes
Wall MountingYesYesYesYesNoNo
Rack MountingNoNoNoNoYesYes

WARNING! Do NOT block the ventilation holes on the Zyxel Device. Allow 100 mm clearance for the ventilation holes to prevent your Zyxel Device from overheating. Do not store things on the Zyxel Device. Do not place a Zyxel Device on another high temperature device. Overheating could affect the performance of your Zyxel Device, or even damage it.

3.2.1 Desktop Installation Procedure

1 Make sure the Zyxel Device is clean and dry.
2 Remove the adhesive backing from the rubber feet.
3 Attach the rubber feet to each corner on the bottom of the Zyxel Device. These rubber feet help protect the Zyxel Device from shock or vibration, and allow air circulation.

Figure 55 Attaching Rubber Feet
ZYXEL USGFLEX700-GB0101F - Desktop Installation Procedure - 1

natural_image Technical line drawing of a rectangular electronic device with mounting holes and ventilation slots (no text or symbols)

4 Set the Zyxel Device on a smooth, level surface strong enough to support the weight of the Zyxel Device and the connected cables. Make sure there is a power outlet nearby.

Note: Make sure to use the rubber feet when stacking the Zyxel Devices on a desk.

3.2.2 Rack-mounting

Use the following steps to mount the Zyxel Device on an EIA standard size, 19-inch rack or in a wiring closet with other equipment using a rack-mounting kit. Make sure the rack will safely support the combined weight of all the equipment it contains and that the position of the ZyWALL does not make the rack unstable or top-heavy. Take all necessary precautions to anchor the rack securely before installing the unit.

Use a #2 Phillips screwdriver to install the screws.

Note: Failure to use the proper screws may damage the unit.

1 Align one bracket with the holes on one side of the Zyxel Device and secure it with the included bracket screws (smaller than the rack-mounting screws).
2 Attach the other bracket in a similar fashion.

Figure 56 Attach Brackets
ZYXEL USGFLEX700-GB0101F - Rack-mounting - 1

natural_image Diagram of a ZyXEL device with mounting connectors and ports (no text or symbols on the device itself)

3 After attaching both mounting brackets, position the Zyxel Device in the rack and match up the bracket holes with the rack holes. Secure the Zyxel Device to the rack with the rack-mounting screws.

Figure 57 Mount on Rack
ZYXEL USGFLEX700-GB0101F - Rack-mounting - 2

natural_image Technical line drawing of a server rack unit with metal frame and mounting feet (no text or symbols)

Note: Make sure there is at least 100 mm of clearance at the sides and 100 mm in the rear to allow air circulation and the attachment of cables and the power cord. When stacking in a rack, make sure there is at least 40 mm of clearance between Zyxel Devices.

3.2.3 Wall-mounting

Do the following to attach your Zyxel Device to a wall.

The following table lists the distance "X" between mounting holes for each model:

Table 15 Distance "X" Between FLEX Mounting Holes

MODEL NAME DISTANCE “X”
USG FLEX 100 174 mm (6.85")
USG FLEX 100W 174 mm (6.85")
USG FLEX 200 206 mm (8.11")

1 Drill into a wall two holes 3 mm – 4 mm (0.12" – 0.16") wide, 20 mm – 30 mm (0.79" – 1.18") deep and a distance X (see the preceding table) apart. Place two screw anchors in the holes.

Figure 58 Wall Mounting Screw Specifications
unit: mm D = 6.5~7.5 H = 1.5 L = 20~30 d = 3.0~4.0 D H L d

2 Screw two screws with 6 mm - 8 mm (0.24" - 0.31") wide heads into the screw anchors. Do not screw the screws all the way in to the wall; leave a small gap between the head of the screw and the wall.

The gap must be big enough for the screw heads to slide into the screw slots and the connection cables to run down the back of the Zyxel Device.

Note: Make sure the screws are securely fixed to the wall and strong enough to hold the weight of the Zyxel Device with the connection cables.

3 Use the holes on the bottom of the Zyxel Device to hang the Zyxel Device on the screws.

Figure 59 Wall Mounting
ZYXEL USGFLEX700-GB0101F - Wall-mounting - 2

natural_image Technical line drawing of a wireless router with attached sensors and connectors (no text or symbols)

Note: Wall-mount the Zyxel Device horizontally. The Zyxel Device's side panels with ventilation slots should not be facing up or down as this position is less safe.

Make sure there is 100 mm of clearance at the sides and 1 – 1.5 mm distance between the screw head and the wall to allow air circulation and the attachment of cables and the power cord.

3.3 Default Zones, Interfaces, and Ports

The default configurations for zones, interfaces, and ports are as follows. References to interfaces may be generic rather than the specific name used in your model. For example, this guide may use "the WAN interface" rather than "wan1" or "wan2", "ge2" or "ge3".

An OPT (optional) Ethernet port can be configured as an additional WAN port, LAN, WLAN, or DMZ port.

The following table shows the default physical port and interface mapping for each model at the time of writing.

Table 16 Default Physical Port – Interface Mapping

PORT / INTERFACEP1 P2P3 P4 P5P6 P7 P8P9 P10P11 P12P13 P14
• USG FLEX 100sfpwanlan1lan1lan1opt
• USG FLEX 100Wsfpwanlan1lan1lan1opt
• USG FLEX 200sfpwanwanlan1lan1lan1lan1
• USG FLEX 500ge1 ge2ge3 ge4ge5 ge6ge7 ge8
• USG FLEX 700ge1ge2ge3ge4ge5ge6ge7ge8ge9ge10ge11ge12ge13ge14

The following table shows the default interface and zone mapping for each model at the time of writing.

Table 17 Default Zone – Interface Mapping

ZONE / INTERFACESFPWANLAN1LAN2DMZOPT
• USG FLEX 100sfp_pppWAN1_PPPLAN1LAN2DMZopt_ppp
• USG FLEX 100Wsfp_pppWAN1_PPPLAN1LAN2DMZopt_ppp

Table 18 Default Zone – Interface Mapping

ZONE / INTERFACEWANLAN1LAN2DMZOPTNO DEFAULT ZONE
• USG FLEX 200WAN1LAN1LAN2DMZSFPGE7
WAN1_PPPSFP_PPPGE7_PPP
WAN2GE8
WAN2_PPPGE8_PPP

Table 19 Default Zone – Interface Mapping

ZONE / INTERFACEWANLANDMZOPTNO DEFAULT ZONE
USG FLEX 500GE2GE2_PPPGE3GE3_PPPGE4GE5GE6GE1GE1_PPPGE7GE7_PPPGE8GE8_PPP
USG FLEX 700GE1GE1_pppGE2GE2_pppGE3GE4GE5GE13GE13_pppGE14GE14_pppGE6-GE12GE6_ppp-GE12_ppp

3.4 Stopping the Zyxel Device

Always use Maintenance > Shutdown > Shutdown or the shutdown command before you turn off the Zyxel Device or remove the power. Not doing so can cause the firmware to become corrupt.

CHAPTER 4

Quick Setup Wizards

4.1 Quick Setup Overview

The Web Configurator's quick setup wizards help you configure Internet and VPN connection settings. This chapter provides information on configuring the quick setup screens in the Web Configurator. See the feature-specific chapters in this User's Guide for background information.

In the Web Configurator, click Quick Setup to open the first Quick Setup screen.

Figure 60 USG FLEX Quick Setup
Quick Setup WAN Interface WAN Quick Setting walks you through the steps of getting your device connected online. VPN Setup For creating secure communications between nodes, VPN Quick Setting provides a simplified process to do that.

- WAN Interface

Click this link to open a wizard to set up a WAN (Internet) connection. This wizard creates matching ISP account settings in the Zyxel Device if you use PPPoE or PPTP. See Section 4.2 on page 80.

- VPN Setup

Use VPN Setup to configure a VPN (Virtual Private Network) rule for a secure connection to another computer or network. Use VPN Settings for Configuration Provisioning to set up a VPN rule that can be retrieved with the Zyxel Device IPSec VPN Client. You only need to enter a user name, password and the IP address of the Zyxel Device in the IPSec VPN Client to get all VPN settings automatically from the Zyxel Device. See Section 4.3 on page 86. Use VPN Settings for L2TP VPN Settings to configure the L2TP VPN for clients.

- Wizard Help

If the help does not automatically display when you run the wizard, click the arrow to display it.

Quick Setup WAN Interface Choose Ethernet > Enter WAN Settings > WAN Configuration Summary 1 2 3 Welcome The later steps will guide you to setup the Internet connection. - Choose Ethernet - Enter WAN Settings - WAN Configuration Summary Click 'Next' to start. Help WAN Interface Quick Setup Use these screens to configure an interface to connect to the Internet. Next >

4.2 WAN Interface Quick Setup

Click WAN Interface in the main Quick Setup screen to open the WAN Interface Quick Setup Wizard Welcome screen. Use these screens to configure an interface to connect to the Internet. Click Next.

Figure 61 WAN Interface Quick Setup Wizard
WAN Interface Choose Ethernet > Enter WAN Settings > WAN Configuration Summary 1 2 3 Welcome The later steps will guide you to setup the Internet connection. - Choose Ethernet - Enter WAN Settings - WAN Configuration Summary Click 'Next' to start. Next >

4.2.1 Choose an Ethernet Interface

Select a WAN interface (names vary by model) that you want to configure for a WAN connection and click Next.

Figure 62 Choose an Ethernet Interface
WAN Interface Choose Ethernet > Enter WAN Settings > WAN Configuration Summary 1 2 3 Ethernet Ethernet Selection: sfp < Back Next >

4.2.2 Select WAN Type

WAN Type Selection: Select the type of encapsulation this connection is to use. Choose Ethernet when the WAN port is used as a regular Ethernet.

Otherwise, choose PPPoE, PPTP or L2TP for a dial-up connection according to the information from your ISP.

Figure 63 WAN Interface Setup: Step 2
WAN Interface Choose Ethernet > Enter WAN Settings > WAN Configuration Summary 1 2 3 IP Address Assignment WAN Type Selection: Ethernet < Back Next >

The screens vary depending on what encapsulation type you use. Refer to information provided by your ISP to know what to enter in each field. Leave a field blank if you don't have that information.

Note: Enter the Internet access information exactly as your ISP gave it to you.

4.2.3 Configure WAN IP Settings

Use this screen to select whether the interface should use a fixed or dynamic IP address.

Figure 64 WAN Interface Setup: Step 2 Ethernet Dynamic IP
WAN Interface Choose Ethernet! > Enter WAN Settings > WAN Configuration Summary 1 2 3 Interface WAN Interface: sfp Zone: WAN IP Address Assignment: Auto < Back Next >

Figure 65 WAN Interface Setup: Step 2 Ethernet Static IP
WAN Interface Choose Ethernet > Enter WAN Settings > WAN Configuration Summary 1 2 3 ISP Parameters Encapsulation: Ethernet IP Address Assignment WAN Interface: sfb Zone: WAN IP Address: 0.0.0.0 IP Subnet Mask: 255.255.255.0 Gateway IP Address: (Optional) First DNS Server: Second DNS Server: < Book Next >

  • WAN Interface: This is the interface you are configuring for Internet access.
    • Zone: This is the security zone to which this interface and Internet connection belong.
  • IP Address Assignment: Select Auto If your ISP did not assign you a fixed IP address. Select Static if you have a fixed IP address and enter the IP address, subnet mask, gateway IP address (optional) and DNS server IP address(es).

4.2.4 ISP and WAN and ISP Connection Settings

Use this screen to configure the ISP and WAN interface settings. This screen is read-only if you select Ethernet and set the IP Address Assignment to Auto. If you set the IP Address Assignment to Static and/or select PPTP or PPPoE, enter the Internet access information exactly as your ISP gave it to you.

Note: Enter the Internet access information exactly as your ISP gave it to you.

Figure 66 WAN and ISP Connection Settings: (PPTP)
WAN Interface Choose Ethernet > Enter WAN Settings > WAN Configuration Summary 1 2 3 ISP Parameters Encapsulation: PPTP Authentication Type: Chap/PAP User Name: ① Password: ① Retype to Confirm: ① □ Noiled-Up Idle timeout: 100 Seconds PPTP Configuration Base Interface: sfp Base IP Address: 0.0.0.0 ① IP Subnet Mask: 255.255.255.0 Gateway IP Address: (Optional) Server IP: 0.0.0.0 ① Connection ID: (Optional) IP Address Assignment WAN Interface: sfp_ppp Zone: WAN IP Address: 0.0.0.0 ① Gateway IP Address: (Optional) First DNS Server: Second DNS Server: < Back Next >

Figure 67 WAN and ISP Connection Settings: (PPPoE)
WAN Interface Choose Ethernet > Enter WAN Settings > WAN Configuration Summary 1 2 3 ISP Parameters Encapsulation: PPPoE Service Name: (Optional) Authentication Type: Chap/PAP User Name : ① Password: ① Retype to Confirm: ① □ Noiled-Up Idle timeout: 100 Seconds IP Address Assignment WAN Interface: sfp_ppp Zone: WAN IP Address: 0.0.0.0 ① Gateway IP Address: (Optional) First DNS Server: Second DNS Server: Not? Configure PPPoE will change ethernet interface ip address as 0.0.0.0. < Back Next >

Figure 68 WAN and ISP Connection Settings: (L2TP)
WAN Interface Choose Ethernet > Enter WAN Settings > WAN Configuration Summary 1 2 3 ISP Parameters Encapsulation: L2TP Authentication Type: Chap/PAP User Name: # Password: # Retype to Confirm: # Nalled-Up Idle timeout: 100 Seconds Base Interface:sfp IP Subnet Mask: 255.255.255.0 Gateway IP Address: (Optional) Server IP: 0.0.0.0 IP Address Assignment WAN Interface:sfp_ppp Zone: WAN IP Address: 0.0.0.0 ① Gateway IP Address: (Optional) First DNS Server: Second DNS Server: < Back Next >

ISP Parameter: This section appears if the interface uses a PPPoE or PPTP Internet connection.

  • Encapsulation: This displays the type of Internet connection you are configuring.
    • Service Name: Type the PPPoE service name if you were given one by your ISP.
  • Authentication Type: Use the drop-down list box to select an authentication protocol for outgoing calls. Options are:
  • CHAP/PAP - Your Zyxel Device accepts either CHAP or PAP when requested by this remote node.
  • CHAP - Your Zyxel Device accepts CHAP only.
  • PAP - Your Zyxel Device accepts PAP only.
    • MSCHAP - Your Zyxel Device accepts MSCHAP only.
    • MSCHAP-V2 - Your Zyxel Device accepts MSCHAP-V2 only.
  • User Name: Type the user name given to you by your ISP. You can use alphanumeric and -@\$ ./ characters, and it can be up to 31 characters long.
  • Password: Type the password associated with the user name above. Use up to 64 ASCII characters except the [] and ?. This field can be blank.
  • Retype to Confirm: Type your password again for confirmation.
  • Nailed-Up: Select Nailed-Up if you do not want the connection to time out.
  • Idle Timeout: Type the time in seconds that elapses before the router automatically disconnects from the PPPoE server. 0 means no timeout.
  • PPTP Configuration: This section only appears if the interface uses a PPTP Internet connection.
  • Base Interface: This displays the identity of the Ethernet interface you configure to connect with a modem or router.
  • Base IP Address: Type the (static) IP address assigned to you by your ISP.

  • IP Subnet Mask: Type the subnet mask assigned to you by your ISP (if given).

  • Gateway IP Address: For PPTP or L2TP, type the gateway IP address if you were given one by your ISP.
  • Server IP: Type the IP address of the PPTP server.
  • Connection ID: Enter the connection ID or connection name in this field. It must follow the "c:id" and "n:name" format. For example, C:12 or N:My ISP. This field is optional and depends on the requirements of your DSL modem. You can use alphanumeric and -: characters, and it can be up to 31 characters long.

IP Address Assignment

  • WAN Interface: This displays the identity of the interface you configure to connect with your ISP.
    • Zone: This field displays to which security zone this interface and Internet connection will belong.
  • IP Address: This field is read-only when the WAN interface uses a dynamic IP address. If your WAN interface uses a static IP address, enter it in this field.
  • IP Subnet Mask: If your WAN interface uses Ethernet encapsulation with a static IP address, enter the subnet mask in this field.

- Gateway IP Address: Type the IP address of the Ethernet device connected to this WAN port.

- First DNS Server / Second DNS Server: These fields only display for an interface with a static IP address. Enter the DNS server IP address(es) in the field(s) to the right. Leave the field as 0.0.0.0 if you do not want to configure DNS servers. If you do not configure a DNS server, you must know the IP address of a machine in order to access it.

4.2.5 Quick Setup Interface Wizard: Summary

This screen displays an example WAN interface's settings.

Figure 69 Interface Wizard: Summary WAN
WAN Interface Choose Ethernet > Enter WAN Settings > WAN Configuration Summary 1 2 3 ge1 Congratulations. The Internet Access wizard is completed. IP Address Assignment Encapsulation: Ethernet WAN Interface: sfp Zone: WAN IP Address Assignment: Auto IP Address: 0.0.0.0 IP Subnet Mask: 0.0.0.0 Gateway IP Address: 0.0.0.0 First DNS Server: N/A Second DNS Server: N/A Close

  • Encapsulation: This displays what encapsulation this interface uses to connect to the Internet.

  • Service Name: This field only appears for a PPPoE interface. It displays the PPPoE service name specified in the ISP account.

  • Server IP: This field only appears for a PPTP interface. It displays the IP address of the PPTP server.
  • User Name: This is the user name given to you by your ISP.
  • Nailed-Up: If No displays the connection will not time out. Yes means the Zyxel Device uses the idle timeout.
  • Idle Timeout: This is how many seconds the connection can be idle before the router automatically disconnects from the PPPoE server. 0 means no timeout.
  • Connection ID: If you specified a connection ID, it displays here.
  • WAN Interface: This identifies the interface you configure to connect with your ISP.
  • Zone: This field displays to which security zone this interface and Internet connection will belong.
  • IP Address Assignment: This field displays whether the WAN IP address is static or dynamic (Auto).
  • IP Address: This field displays the current IP address of the Zyxel Device WAN interface selected in this wizard.
  • IP Subnet Mask: This field displays the subnet mask of the Zyxel Device WAN interface selected in this wizard.
  • Gateway IP Address: This field displays the IP address of the Ethernet device connected to this WAN port.
  • First DNS Server / Second DNS Server: If the IP Address Assignment is Static, these fields display the DNS server IP address(es).

4.3 VPN Setup Wizard

Click VPN Setup in the main Quick Setup screen to open the VPN Setup Wizard Welcome screen.

Figure 70 VPN Setup Wizard
Quick Setup WAN Interface WAN Quick Setting walks you through the steps of getting your device connected online. VPN Setup For creating secure communications between nodes, VPN Quick Setting provides a simplified process to do that.

4.3.1 Welcome

Use wizards to create Virtual Private Network (VPN) rules. After you complete the wizard, the Phase 1 rule settings appear in the Configuration > VPN > IPSec VPN > VPN Gateway screen and the Phase 2 rule settings appear in the Configuration > VPN > IPSec VPN > VPN Connection screen.

- VPN Settings configures a VPN tunnel for a secure connection to another computer or network.

  • VPN Settings for Configuration Provisioning sets up a VPN rule the Zyxel Device IPSec VPN Client can retrieve. Just enter a user name, password and the IP address of the Zyxel Device in the IPSec VPN Client to get the VPN settings automatically from the Zyxel Device.
  • VPN Settings for L2TP VPN Settings sets up a L2TP VPN rule that the Zyxel Device IPSec L2TP VPN client can retrieve.

Figure 71 VPN Setup Wizard Welcome
VPN Setup Wizard Wizard Type > VPN Settings > Wizard Completed 1 2 3 Welcome ◎ VPN Settings - Wizard Type - VPN Settings - Wizard Completed ◎ VPN Settings for Configuration Provisioning - Wizard Type - VPN Settings - Wizard Completed ◎ VPN Settings for LZIP VPN Settings - VPN Settings - General Settings - Wizard Completed Upon completion of the Wizard Setup i. VPN Tunnel and VPN Gateway are automatically configured/generated ii. Policy Route is automatically configured/generated Next > VPN Setup Wizard Use wizards to create Virtual Private Network (VPN) rules. • VPN Settings configures a VPN funnel for a secure connection to another computer or network. • VPN Settings for Configuration Provisioning sets up a VPN rule the Zyxel Device IPSec VPN Client can retrieve. Just enter a user name, password and the IP address of the Zyxel Device in the IPSec VPN Client to get the VPN settings automatically from the Zyxel Device. • VPN Settings for LZIP VPN Settings sets up a LZIP VPN rule that the Zyxel Device IPSec LZIP VPN client can retrieve.

4.3.2 VPN Setup Wizard: Wizard Type

Choose Express to create a VPN rule with the default phase 1 and phase 2 settings to connect to another ZLD-based Zyxel Device using a pre-shared key.

Choose Advanced to change the default settings and/or use certificates instead of a pre-shared key to create a VPN rule to connect to another IPSec device.

Figure 72 VPN Setup Wizard: Wizard Type
VPN Setup Wizard Wizard Type > VPN Settings > Wizard Completed 1 2 3 Please select the type of VPN policy you wish to setup. Type of VPN policy Express Advanced < Back Next >

4.3.3 VPN Express Wizard - Scenario

Click the Express radio button as shown in Figure 72 on page 87 to display the following screen.

Figure 73 VPN Express Wizard: Scenario
VPN Setup Wizard VPN Setup Wizard Wizard Type > VPN Settings > Wizard Completed 1 2 3 Express Settings IKE Version ● IKEv1 ○ IKEv2 Scenario Rule Name: WIZ_VPN ● Site-to-site ○ Site-to-site with Dynamic Peer ○ Remote Access (Server Role) ○ Remote Access (Client Role) < Back Next >

IKE (Internet Key Exchange) Version: IKEv1 and IKEv2

IKE (Internet Key Exchange) is a protocol used in security associations to send data securely. IKE uses certificates or pre-shared keys for authentication and a Diffie-Hellman key exchange to set up a shared session secret from which encryption keys are derived.

IKEv2 supports Extended Authentication Protocol (EAP) authentication, and IKEv1 supports X-Auth. EAP is important when connecting to existing enterprise authentication systems.

Scenario

Rule Name: Type the name used to identify this VPN connection (and VPN gateway). You may use 1-31 alphanumeric characters, underscores (_), or dashes (-), but the first character cannot be a number. This value is case-sensitive.

Select the scenario that best describes your intended VPN connection. The figure on the left of the screen changes to match the scenario you select.

  • Site-to-site - The remote IPSec device has a static IP address or a domain name. This Zyxel Device can initiate the VPN tunnel.
  • Site-to-site with Dynamic Peer - The remote IPSec device has a dynamic IP address. Only the remote IPSec device can initiate the VPN tunnel.
  • Remote Access (Server Role) - Allow incoming connections from IPSec VPN clients. The clients have dynamic IP addresses and are also known as dial-in users. Only the clients can initiate the VPN tunnel.

- Remote Access (Client Role) - Connect to an IPSec server. This Zyxel Device is the client (dial-in user) and can initiate the VPN tunnel.

4.3.4 VPN Express Wizard - Configuration

Figure 74 VPN Express Wizard: Configuration
VPN Setup Wizard Wizard Type > VPN Settings > Wizard Completed 1 2 3 Express Settings My Address (interface): wan1 Configuration Secure Gateway: (IP or FQDN) Pre-Shared Key: Local Policy (IP/Mask): 0.0.0.0 255.255.255.0 Remote Policy (IP/Mask): 0.0.0.0 255.255.255.0 < Back Next >

  • My Address (interface): Select an interface from the drop-down list box to use on your Zyxel Device.
  • Secure Gateway: Any displays in this field if it is not configurable for the chosen scenario. Otherwise, enter the WAN IP address or domain name of the remote IPSec device (secure gateway) to identify the remote IPSec router by its IP address or a domain name. Use 0.0.0.0 if the remote IPSec router has a dynamic WAN IP address.
  • Pre-Shared Key: Type the password. Both ends of the VPN tunnel must use the same password. Use 8 to 31 case-sensitive ASCII characters or 8 to 31 pairs of hexadecimal ("0-9", "A-F") characters. Proceed a hexadecimal key with "0x". You will receive a PYLD_MALFORMED (payload malformed) packet if the same pre-shared key is not used on both ends.
  • Local Policy (IP/ Mask): Type the IP address of a computer on your network that can use the tunnel. You can also specify a subnet. This must match the remote IP address configured on the remote IPSec device.
  • Remote Policy (IP/ Mask): Any displays in this field if it is not configurable for the chosen scenario. Otherwise, type the IP address of a computer behind the remote IPSec device. You can also specify a subnet. This must match the local IP address configured on the remote IPSec device.

4.3.5 VPN Express Wizard - Summary

This screen provides a read-only summary of the VPN tunnel's configuration and commands that you can copy and paste into another ZLD-based Zyxel Device's command line interface to configure it.

Figure 75 VPN Express Wizard: Summary
VPN Setup Wizard Wizard Type > VPN Settings > Wizard Completed 1 2 3 Express Settings Summary Rule Name: WIZ_VPN Secure Gateway: Any Pre-Shared Key:,testtest Local Policy (IP/Mask): 0.0.0.0 / 255.255.255.0 Remote Policy (IP/Mask): 0.0.0.0 / 255.255.255.0 Configuration for Secure Gateway Edit this shell script according to the comments before using it in the remote gateway. Check the peer-ip interface. Check the local-ip interface. Edit the WIZ_VPN_LOCAL address-object. Then remove the following line. PLEASE REMOVE THIS LINE configure terminal ikev2 policy WIZ_VPN If this device's won! IP is dynamic, consider using DDNS and changing Click "Save" button to write the VPN configuration to ZyWALL. < Back Save

  • Rule Name: Identifies the VPN gateway policy.
  • Secure Gateway: IP address or domain name of the remote IPSec device. If this field displays Any, only the remote IPSec device can initiate the VPN connection.
  • Pre-Shared Key: VPN tunnel password. It identifies a communicating party during a phase 1 IKE negotiation.
  • Local Policy: IP address and subnet mask of the computers on the network behind your Zyxel Device that can use the tunnel.
  • Remote Policy: IP address and subnet mask of the computers on the network behind the remote IPSec device that can use the tunnel. If this field displays Any, only the remote IPSec device can initiate the VPN connection.
  • Copy and paste the Configuration for Secure Gateway commands into another ZLD-based Zyxel Device's command line interface to configure it to serve as the other end of this VPN tunnel. You can also use a text editor to save these commands as a shell script file with a ".zysh" filename extension. Use the file manager to run the script in order to configure the VPN connection. See the commands reference guide for details on the commands displayed in this list.

4.3.6 VPN Express Wizard - Finish

Now the rule is configured on the Zyxel Device. The Phase 1 rule settings appear in the VPN > IPSec VPN > VPN Gateway screen and the Phase 2 rule settings appear in the VPN > IPSec VPN > VPN Connection screen.

Figure 76 VPN Express Wizard: Finish
VPN Setup Wizard Wizard Type > VPN Settings > Wizard Completed 1 2 3 Express Settings Congratulations. The VPN Access wizard is completed Summary Rule Name: WIZ_VPN Secure Gateway: Any My Address (Interface): wan! Pre-Shared Key: testtest Local Policy (IP/Mask): 0.0.0.0 / 255.255.255.0 Remote Policy (IP/Mask): Any Now if you are doing first time installation of this device, you may click this portal.myzvoxel.com link and to register this device and activate trial service of advanced security features.(You need to have internet access to register) Close

Click Close to exit the wizard.

4.3.7 VPN Advanced Wizard - Scenario

Click the Advanced radio button as shown in Figure 72 on page 87 to display the following screen.

Figure 77 VPN Advanced Wizard: Scenario
VPN Setup Wizard Wizard Type > VPN Settings > Wizard Completed Advanced Settings IKE Version ● IKEv1 ○ IKEv2 Scenario Rule Name: WIZVPN ● Site-to-site ○ Site-to-site with Dynamic Peer ○ Remote Access (Server Role) ○ Remote Access (Client Role) < Back Next >

IKE (Internet Key Exchange) Version: IKEv1 and IKEv2

IKE (Internet Key Exchange) is a protocol used in security associations to send data securely. IKE uses certificates or pre-shared keys for authentication and a Diffie–Hellman key exchange to set up a shared session secret from which encryption keys are derived.

IKEv2 supports Extended Authentication Protocol (EAP) authentication, and IKEv1 supports X-Auth. EAP is important when connecting to existing enterprise authentication systems.

Scenario

Rule Name: Type the name used to identify this VPN connection (and VPN gateway). You may use 1-31 alphanumeric characters, underscores (_), or dashes (-), but the first character cannot be a number. This value is case-sensitive.

Select the scenario that best describes your intended VPN connection. The figure on the left of the screen changes to match the scenario you select.

  • Site-to-site - The remote IPSec device has a static IP address or a domain name. This Zyxel Device can initiate the VPN tunnel.
  • Site-to-site with Dynamic Peer - The remote IPSec device has a dynamic IP address. Only the remote IPSec device can initiate the VPN tunnel.
  • Remote Access (Server Role) - Allow incoming connections from IPSec VPN clients. The clients have dynamic IP addresses and are also known as dial-in users. Only the clients can initiate the VPN tunnel.
  • Remote Access (Client Role) - Connect to an IPSec server. This Zyxel Device is the client (dial-in user) and can initiate the VPN tunnel.

4.3.8 VPN Advanced Wizard - Phase 1 Settings

There are two phases to every IKE (Internet Key Exchange) negotiation – phase 1 (Authentication) and phase 2 (Key Exchange). A phase 1 exchange establishes an IKE SA (Security Association).

Figure 78 VPN Advanced Wizard: Phase 1 Settings
VPN Setup Wizard Wizard Type > VPN Settings > Wizard Completed 1 2 3 Advanced Settings Phase 1 Setting Secure Gateway: _________ (IP or FQDN) My Address (interface): wan i Negotiation Mode: Main Encryption Algorithm: AES128 Authentication Algorithm: SHA1 Key Group: DH2 SA Life Time: BG6400 (160 - 3000000 seconds) NAT Traversal Dead Peer Detection (DPD) Authentication Method Pre-Shared Key Certificate default < Back Next >

  • Secure Gateway: Any displays in this field if it is not configurable for the chosen scenario. Otherwise, enter the WAN IP address or domain name of the remote IPSec device (secure gateway) to identify the remote IPSec device by its IP address or a domain name. Use 0.0.0.0 if the remote IPSec device has a dynamic WAN IP address.
  • My Address (interface): Select an interface from the drop-down list box to use on your Zyxel Device.
  • Negotiation Mode: This displays Main or Aggressive:

- Main encrypts the ZyWALL/USG's and remote IPSec router's identities but takes more time to establish the IKE SA.

- Aggressive is faster but does not encrypt the identities.

The ZyWALL/USG and the remote IPSec router must use the same negotiation mode. Multiple SAs connecting through a secure gateway must have the same negotiation mode.

  • Encryption Algorithm: 3DES and AES use encryption. The longer the key, the higher the security (this may affect throughput). Both sender and receiver must use the same secret key, which can be used to encrypt and decrypt the message or to generate and verify a message authentication code. The DES encryption algorithm uses a 56-bit key. Triple DES (3DES) is a variation on DES that uses a 168-bit key. As a result, 3DES is more secure than DES. It also requires more processing power, resulting in increased latency and decreased throughput. AES128 uses a 128-bit key and is faster than 3DES. AES192 uses a 192-bit key, and AES256 uses a 256-bit key.
  • Authentication Algorithm: MD5 gives minimal security and SHA512 gives the highest security. MD5 (Message Digest 5) and SHA (Secure Hash Algorithm) are hash algorithms used to authenticate packet data. The stronger the algorithm the slower it is.
  • Key Group: DH5 is more secure than DH1 or DH2 (although it may affect throughput). DH1 (default) refers to Diffie-Hellman Group 1 a 768 bit random number. DH2 refers to Diffie-Hellman Group 2 a 1024 bit (1Kb) random number. DH5 refers to Diffie-Hellman Group 5 a 1536 bit random number.
  • SA Life Time: Set how often the Zyxel Device renegotiates the IKE SA. A short SA life time increases security, but renegotiation temporarily disconnects the VPN tunnel.
  • NAT Traversal: Select this if the VPN tunnel must pass through NAT (there is a NAT router between the IPSec devices).

Note: The remote IPSec device must also have NAT traversal enabled. See the help in the main IPSec VPN screens for more information.

  • Dead Peer Detection (DPD) has the Zyxel Device make sure the remote IPSec device is there before transmitting data through the IKE SA. If there has been no traffic for at least 15 seconds, the Zyxel Device sends a message to the remote IPSec device. If it responds, the Zyxel Device transmits the data. If it does not respond, the Zyxel Device shuts down the IKE SA.
  • Authentication Method: Select Pre-Shared Key to use a password or Certificate to use one of the Zyxel Device's certificates.

4.3.9 VPN Advanced Wizard - Phase 2

Phase 2 in an IKE uses the SA that was established in phase 1 to negotiate SAs for IPSec.

Figure 79 VPN Advanced Wizard: Phase 2 Settings
VPN Setup Wizard Wizard Type > VPN Settings > Wizard Completed 1 2 3 Advanced Settings Phase 2 Setting Active Protocol: ESP Encapsulation: Tunnel Encryption Algorithm: AES128 Authentication Algorithm: SHA1 SA Life Time: 26800 (180 - 3000000 seconds) Perfect Forward Secrecy (PFS): DH2 Policy Setting Local Policy (IP/Mask): 0.0.0.0 /255.255.255.0 Remote Policy (IP/Mask): 0.0.0.0 /255.255.255.0 Property ✓ Nalled-Up < Back Next >

• Active Protocol: ESP is compatible with NAT, AH is not.
- Encapsulation: Tunnel is compatible with NAT, Transport is not.
- Encryption Algorithm: 3DES and AES use encryption. The longer the AES key, the higher the security (this may affect throughput). Null uses no encryption.
- Authentication Algorithm: MD5 gives minimal security and SHA512 gives the highest security. MD5 (Message Digest 5) and SHA (Secure Hash Algorithm) are hash algorithms used to authenticate packet data. The stronger the algorithm the slower it is.
- SA Life Time: Set how often the Zyxel Device renegotiates the IKE SA. A short SA life time increases security, but renegotiation temporarily disconnects the VPN tunnel.
- Perfect Forward Secrecy (PFS): Disabling PFS allows faster IPSec setup, but is less secure. Select DH1, DH2 or DH5 to enable PFS. DH5 is more secure than DH1 or DH2 (although it may affect throughput). DH1 refers to Diffie-Hellman Group 1 a 768 bit random number. DH2 refers to Diffie-Hellman Group 2 a 1024 bit (1Kb) random number. DH5 refers to Diffie-Hellman Group 5 a 1536 bit random number (more secure, yet slower).
- Local Policy (IP/ Mask): Type the IP address of a computer on your network. You can also specify a subnet. This must match the remote IP address configured on the remote IPSec device.

  • Remote Policy (IP/ Mask): Type the IP address of a computer behind the remote IPSec device. You can also specify a subnet. This must match the local IP address configured on the remote IPSec device.
  • Nailed-Up: This displays for the site-to-site and remote access client role scenarios. Select this to have the Zyxel Device automatically renegotiate the IPSec SA when the SA life time expires.

4.3.10 VPN Advanced Wizard - Summary

This is a read-only summary of the VPN tunnel settings.

Figure 80 VPN Advanced Wizard: Summary
VPN Setup Wizard Wizard type > VPN Settings > Wizard Completed 1 2 3 Advanced Settings Summary Rule Name: Test Secure Gateway: 0.0.0.0 Pre-Shared Key: testtest Local Policy (IP/Mask): 0.0.0.0 / 255.255.255.0 Remote Policy (IP/Mask): 0.0.0.0 / 255.255.255.0 Phase 1 Negotiation Mode: main Encryption Algorithm: aes128 Authentication Algorithm: sha Key Group: DH2 Phase 2 Active Protocol: esp Encapsulation: tunnel Encryption Algorithm: aes128 Authentication Algorithm: sha Configuration for Secure Gateway Edit this shell script according to the comments before using it in the remote gateway. Check the peer-ip interface. Check the local-ip interface. Edit the Test_LOCAL address-object. Then remove the following line. PLEASE REMOVE THIS LINE configure terminal Isakmp policy Test peer-ip 0.0.0.0 0.0.0.0 Use the correct Interface name in the Click "Save" button to write the VPN configuration to ZyWALL.

  • Rule Name: Identifies the VPN connection (and the VPN gateway).
  • Secure Gateway: IP address or domain name of the remote IPSec device.
    • Pre-Shared Key: VPN tunnel password.
  • Certificate: The certificate the Zyxel Device uses to identify itself when setting up the VPN tunnel.
  • Local Policy: IP address and subnet mask of the computers on the network behind your Zyxel Device that can use the tunnel.
  • Remote Policy: IP address and subnet mask of the computers on the network behind the remote IPSec device that can use the tunnel.

Phase 1

- Negotiation Mode: This displays Main or Aggressive:

  • Main encrypts the ZyWALL/USG's and remote IPSec router's identities but takes more time to establish the IKE SA.
  • Aggressive is faster but does not encrypt the identities.

The ZyWALL/USG and the remote IPSec router must use the same negotiation mode. Multiple SAs connecting through a secure gateway must have the same negotiation mode.

- Encryption Algorithm: This displays the encryption method used. The longer the key, the higher the security, the lower the throughput (possibly).

• DES uses a 56-bit key.
• 3DES uses a 168-bit key.
• AES128 uses a 128-bit key.
• AES192 uses a 192-bit key.
• AES256 uses a 256-bit key.

- Authentication Algorithm: This displays the authentication algorithm used. The stronger the algorithm, the slower it is.

• MD5 gives minimal security.
• SHA1 gives higher security.
• SHA256 gives the highest security.

• Active Protocol: This displays ESP (compatible with NAT) or AH.
- Encapsulation: This displays Tunnel (compatible with NAT) or Transport.
- Encryption Algorithm: This displays the encryption method used. The longer the key, the higher the security, the lower the throughput (possibly).
• DES uses a 56-bit key.
• 3DES uses a 168-bit key.
• AES128 uses a 128-bit key.
• AES192 uses a 192-bit key.
• AES256 uses a 256-bit key.
- Null uses no encryption.

- Authentication Algorithm: This displays the authentication algorithm used. The stronger the algorithm, the slower it is.

• MD5 gives minimal security.
• SHA1 gives higher security.
• SHA256 gives the highest security.

Copy and paste the Configuration for Remote Gateway commands into another ZLD-based Zyxel Device's command line interface.

Click Save to save the VPN rule.

4.3.11 VPN Advanced Wizard - Finish

Now the rule is configured on the Zyxel Device. The Phase 1 rule settings appear in the VPN > IPSec VPN > VPN Gateway screen and the Phase 2 rule settings appear in the VPN > IPSec VPN > VPN Connection screen.

Figure 81 VPN Wizard: Finish
VPN Setup Wizard Wizard Type > VPN Settings > Wizard Completed 1 2 3 Advanced Settings Congratulations. The VPN Access wizard is completed Summary Rule Name: test Secure Gateway: 192.163.1.1 My Address (interface): wan1 Pre-Shared Key: testtest Phase 1 Negotiation Mode: main Encryption Algorithm: aes128 Authentication Algorithm: sha Key Group: DH2 SA Life Time: 86400 NAT Traversal: true Dead Peer Detection (DPD): true Phase 2 Active Protocol: esp Encapsulation: tunnel Encryption Algorithm: aes128 Authentication Algorithm: sha SA Life Time: 28800 Perfect Forward Secrecy (PFS): group2 Policy Local Policy (IP/Mask): 0.0.0.0 / 255.255.255.0 Remote Policy (IP/Mask): 0.0.0.0 / 255.255.255.0 Nailed-Up: true Now if you are doing first time installation of this device, you may click this portal.myzyxel.com link and to register this device and activate trial service of advanced security features.(You need to have internet access to register) Close

Click Close to exit the wizard.

4.4 VPN Settings for Configuration Provisioning Wizard: Wizard Type

Use VPN Settings for Configuration Provisioning to set up a VPN rule that can be retrieved with the Zyxel Device IPSec VPN Client.

VPN rules for the Zyxel Device IPSec VPN Client have certain restrictions. They must not contain the following settings:

• AH active protocol
- NULL encryption
• SHA512 authentication
• A subnet or range remote policy

Choose Express to create a VPN rule with the default phase 1 and phase 2 settings and to use a pre-shared key.

Choose Advanced to change the default settings and/or use certificates instead of a pre-shared key in the VPN rule.

Figure 82 VPN Settings for Configuration Provisioning Express Wizard: Wizard Type
VPN Setup Wizard Wizard Type > VPN Settings > Wizard Completed 1 2 3 Please select the type of VPN policy you wish to setup. Type of VPN policy Express Advanced < Back Next >

4.4.1 Configuration Provisioning Express Wizard - VPN Settings

Click the Express radio button as shown in the previous screen to display the following screen.

Figure 83 VPN for Configuration Provisioning Express Wizard: Settings Scenario
VPN Setup Wizard VPN Setup Wizard Wizard Type > VPN Settings > Wizard Completed 1 2 3 Express Settings IKE Version @ IKEv1 @ IKEv2 Scenario Rule Name: WIZ_VPN_PROVISIONING Application Scenario: Remote Access (Server Role) < Back Next >

  • IKE (Internet Key Exchange) is a protocol used in security associations to send data securely. IKE uses certificates or pre-shared keys for authentication and a Diffie–Hellman key exchange to set up a shared session secret from which encryption keys are derived.
  • IKEv2 supports Extended Authentication Protocol (EAP) authentication, and IKEv1 supports X-Auth. EAP is important when connecting to existing enterprise authentication systems.
  • Rule Name: Type the name used to identify this VPN connection (and VPN gateway). You may use 1-31 alphanumeric characters, underscores (_), or dashes (-), but the first character cannot be a number. This value is case-sensitive.
  • Application Scenario: Only the Remote Access (Server Role) is allowed in this wizard. It allows incoming connections from the Zyxel Device IPSec VPN Client.

4.4.2 Configuration Provisioning VPN Express Wizard - Configuration

Click Next to continue the wizard.

Figure 84 VPN for Configuration Provisioning Express Wizard: Configuration
VPN Setup Wizard Wizard Type > VPN Settings > Wizard Completed 1 2 3 Express Settings My Address (interface): wan1 Configuration Secure Gateway: Any Pre-Shared Key: Local Policy (IP/Mask): 0.0.0.0 255.255.255.0 Remote Access (Server Role) < Back Next >

  • My Address (interface): Select an interface from the drop-down list box to use on your Zyxel Device.
  • Secure Gateway: Any displays in this field because it is not configurable in this wizard. It allows incoming connections from the Zyxel Device IPSec VPN Client.
  • Pre-Shared Key: Type the password. Both ends of the VPN tunnel must use the same password. Use 8 to 31 case-sensitive ASCII characters or 8 to 31 pairs of hexadecimal ("0-9", "A-F") characters. Proceed a hexadecimal key with "0x". You will receive a PYLD_MALFORMED (payload malformed) packet if the same pre-shared key is not used on both ends.
  • Local Policy (IP/ Mask): Type the IP address of a computer on your network. You can also specify a subnet. This must match the remote IP address configured on the remote IPSec device.
  • Remote Policy (IP/Mask): Any displays in this field because it is not configurable in this wizard.

4.4.3 VPN Settings for Configuration Provisioning Express Wizard - Summary

This screen has a read-only summary of the VPN tunnel's configuration and commands you can copy and paste into another ZLD-based Zykel Device's command line interface to configure it.

Figure 85 VPN for Configuration Provisioning Express Wizard: Summary
VPN Setup Wizard Wizard Type > VPN Settings > Wizard Completed 1 2 3 Express Settings Summary Rule Name: WIZ_VPN_PROVISIONING Secure Gateway: Any Pre-Shared Key: testtest Local Policy (IP/Mask): 0.0.0.0 / 255.255.255.0 Remote Policy (IP/Mask): Any Configuration for Secure Gateway Edit this shell script according to the comments before using it in the remote gateway. Check the peer-lp interface. Check the local-lp interface. Edit the WIZ_VPN_PROVISIONING_LOCAL address- object. Then remove the following line. PLEASE REMOVE THIS LINE configure terminal ikev2 policy WIZ_VPN_PROVISIONING If this device's want IP is dynamic. Click "Save" button to write the VPN configuration to ZyWALL. < Back Save

  • Rule Name: Identifies the VPN gateway policy.
  • Secure Gateway: Any displays in this field because it is not configurable in this wizard. It allows incoming connections from the Zyxel Device IPSec VPN Client.
  • Pre-Shared Key: VPN tunnel password. It identifies a communicating party during a phase 1 IKE negotiation.
  • Local Policy: (Static) IP address and subnet mask of the computers on the network behind your Zyxel Device that can be accessed using the tunnel.
  • Remote Policy: Any displays in this field because it is not configurable in this wizard.
  • The Configuration for Secure Gateway displays the configuration that the Zyxel Device IPSec VPN Client will get from the Zyxel Device.
  • Click Save to save the VPN rule.

4.4.4 VPN Settings for Configuration Provisioning Express Wizard - Finish

The rule is now configured on the Zyxel Device. The Phase 1 rule settings appear in the Configuration >VPN > IPSec VPN > VPN Gateway screen and the Phase 2 rule settings appear in the Configuration >VPN > IPSec VPN > VPN Connection screen. Enter the IP address of the Zyxel Device in the Zyxel Device IPSec VPN Client to get all these VPN settings automatically from the Zyxel Device.

Figure 86 VPN for Configuration Provisioning Express Wizard: Finish
VPN Setup Wizard Wizard Type > VPN Settings > Wizard Completed 1 2 3 Express Settings Congratulations. The VPN Access wizard is completed Summary Rule Name: Example Secure Gateway: Any My Address (Interface): won! Pre-Shared Key: tastest Local Policy (IP/Mask): 0.0.0.0 / 255.255.255.0 Remote Policy (IP/Mask): Any Now if you are doing first time installation of this device, you may click this portal.myzyxel.com link and to register this device and activate trial service of advanced security features.(You need to have internet access to register) Close

Click Close to exit the wizard.

4.4.5 VPN Settings for Configuration Provisioning Advanced Wizard - Scenario

Click the Advanced radio button as shown in Figure 82 on page 98 to display the following screen.

Figure 87 VPN for Configuration Provisioning Advanced Wizard: Scenario Settings
VPN Setup Wizard VPN Setup Wizard Wizard Type > VPN Settings > Wizard Completed 1 2 3 Express Settings IKE Version © IKEv1 © IKEv2 Scenario Rule Name: WIZ_VPN_PROVISIONING Application Scenario: Remote Access (Server Role) Remote Access (Server Role)

  • IKE (Internet Key Exchange) is a protocol used in security associations to send data securely. IKE uses certificates or pre-shared keys for authentication and a Diffie–Hellman key exchange to set up a shared session secret from which encryption keys are derived.
  • IKEv2 supports Extended Authentication Protocol (EAP) authentication, and IKEv1 supports X-Auth. EAP is important when connecting to existing enterprise authentication systems.
  • Rule Name: Type the name used to identify this VPN connection (and VPN gateway). You may use 1-31 alphanumeric characters, underscores (_), or dashes (-), but the first character cannot be a number. This value is case-sensitive.
  • Application Scenario: Only the Remote Access (Server Role) is allowed in this wizard. It allows incoming connections from the Zyxel Device IPSec VPN Client.

Click Next to continue the wizard.

4.4.6 VPN Settings for Configuration Provisioning Advanced Wizard - Phase 1 Settings

There are two phases to every IKE (Internet Key Exchange) negotiation – phase 1 (Authentication) and phase 2 (Key Exchange). A phase 1 exchange establishes an IKE SA (Security Association).

Figure 88 VPN for Configuration Provisioning Advanced Wizard: Phase 1 Settings
VPN Setup Wizard Wizard Type > VPN Settings > Wizard Completed 1 2 3 Advanced Settings Phase 1 Setting Secure Gateway: Any My Address (Interface): wan1 Negotiation Mode: Main Encryption Algorithm: AES126 Authentication Algorithm: SHA1 Key Group: DH2 SA Life Time: 86400 (180 - 3000000 seconds) NAT Traversal Dead Peer Detection (DPD) Authentication Method Pre-Shared Key Certificate default < Back Next >

  • Secure Gateway: Any displays in this field because it is not configurable in this wizard. It allows incoming connections from the Zyxel Device IPSec VPN Client.
  • My Address (interface): Select an interface from the drop-down list box to use on your Zyxel Device.
    • Negotiation Mode: This displays Main or Aggressive:
  • Main encrypts the ZyWALL/USG's and remote IPSec router's identities but takes more time to establish the IKE SA.
  • Aggressive is faster but does not encrypt the identities.

The ZyWALL/USG and the remote IPSec router must use the same negotiation mode. Multiple SAs connecting through a secure gateway must have the same negotiation mode.

  • Encryption Algorithm: 3DES and AES use encryption. The longer the key, the higher the security (this may affect throughput). Both sender and receiver must know the same secret key, which can be used to encrypt and decrypt the message or to generate and verify a message authentication code. The DES encryption algorithm uses a 56-bit key. Triple DES (3DES) is a variation on DES that uses a 168-bit key. As a result, 3DES is more secure than DES. It also requires more processing power, resulting in increased latency and decreased throughput. AES128 uses a 128-bit key and is faster than 3DES. AES192 uses a 192-bit key and AES256 uses a 256-bit key.
  • Authentication Algorithm: MD5 (Message Digest 5) and SHA (Secure Hash Algorithm) are hash algorithms used to authenticate packet data. MD5 gives minimal security. SHA1 gives higher security and SHA256 gives the highest security. The stronger the algorithm, the slower it is.
  • Key Group: DH5 is more secure than DH1 or DH2 (although it may affect throughput). DH1 (default) refers to Diffie-Hellman Group 1 a 768 bit random number. DH2 refers to Diffie-Hellman Group 2 a 1024 bit (1Kb) random number. DH5 refers to Diffie-Hellman Group 5 a 1536 bit random number.
  • SA Life Time: Set how often the Zyxel Device renegotiates the IKE SA. A short SA life time increases security, but renegotiation temporarily disconnects the VPN tunnel.
  • Authentication Method: Select Pre-Shared Key to use a password or Certificate to use one of the Zyxel Device's certificates.

4.4.7 VPN Settings for Configuration Provisioning Advanced Wizard - Phase 2

Phase 2 in an IKE uses the SA that was established in phase 1 to negotiate SAs for IPSec.

Figure 89 VPN for Configuration Provisioning Advanced Wizard: Phase 2 Settings
VPN Setup Wizard Wizard Type > VPN Settings > Wizard Completed 1 2 3 Advanced Settings Phase 2 Setting Active Protocol: ESP Encapsulation: Tunnel Encryption Algorithm: AES128 Authentication Algorithm: SHA1 SA Life Time: 28800 (180 - 3000000 seconds) Perfect Forward Secrecy [PFS]: DH2 Policy Setting Local Policy (IP/Mask): 0.0.0.0 / 255.255.255.0 Remote Policy (IP/Mask): Any < Back Next >

• Active Protocol: ESP is compatible with NAT. AH is not available in this wizard.
- Encapsulation: Tunnel is compatible with NAT, Transport is not.
- Encryption Algorithm: 3DES and AES use encryption. The longer the AES key, the higher the security (this may affect throughput). Null uses no encryption.
- Authentication Algorithm: MD5 (Message Digest 5) and SHA (Secure Hash Algorithm) are hash algorithms used to authenticate packet data. MD5 gives minimal security. SHA1 gives higher security and SHA256 gives the highest security. The stronger the algorithm, the slower it is.

  • SA Life Time: Set how often the Zyxel Device renegotiates the IKE SA. A short SA life time increases security, but renegotiation temporarily disconnects the VPN tunnel.
  • Perfect Forward Secrecy (PFS): Disabling PFS allows faster IPSec setup, but is less secure. Select DH1, DH2 or DH5 to enable PFS. DH5 is more secure than DH1 or DH2 (although it may affect throughput). DH1 refers to Diffie-Hellman Group 1 a 768 bit random number. DH2 refers to Diffie-Hellman Group 2 a 1024 bit (1Kb) random number. DH5 refers to Diffie-Hellman Group 5 a 1536 bit random number (more secure, yet slower).
  • Local Policy (IP/ Mask): Type the IP address of a computer on your network. You can also specify a subnet. This must match the remote IP address configured on the remote IPSec device.
  • Remote Policy (IP/Mask): Any displays in this field because it is not configurable in this wizard.
  • Nailed-Up: This displays for the site-to-site and remote access client role scenarios. Select this to have the Zyxel Device automatically renegotiate the IPSec SA when the SA life time expires.

4.4.8 VPN Settings for Configuration Provisioning Advanced Wizard - Summary

This is a read-only summary of the VPN tunnel settings.

Figure 90 VPN for Configuration Provisioning Advanced Wizard: Summary
VPN Setup Wizard Wizard Type > VPN Settings > Wizard Completed 1 2 3 Advanced Settings Summary Rule Name: Test Secure Gateway: Any Pre-Shared Key: testtest Local Policy (IP/Mask): 0.0.0.0 / 255.255.255.0 Remote Policy (IP/Mask): Any Phase 1 Negotiation Mode: main Encryption Algorithm: aes128 Authentication Algorithm: sha Key Group: DH2 Phase 2 Active Protocol: esp Encapsulation: tunnel Encryption Algorithm: aes128 Authentication Algorithm: sha Configuration for Secure Gateway Edit this shell script according to the comments before using it in the remote gateway. Check the peer-ip interface. Check the local-ip interface. Edit the Test_LOCAL address-object. Then remove the following line. PLEASE REMOVE THIS LINE configure terminal isakmp policy Test If this device's wan1 IP is dynamic, consider using DDNS and changing Click "Save" button to write the VPN configuration to ZyWALL. < Back Save

Summary

  • Rule Name: Identifies the VPN connection (and the VPN gateway).
  • Secure Gateway: Any displays in this field because it is not configurable in this wizard. It allows incoming connections from the Zyxel Device IPSec VPN Client.
    • Pre-Shared Key: VPN tunnel password.
  • Local Policy: IP address and subnet mask of the computers on the network behind your Zyxel Device that can use the tunnel.
  • Remote Policy: Any displays in this field because it is not configurable in this wizard.

Phase 1

• Negotiation Mode: This displays Main or Aggressive:

- Main encrypts the ZyWALL/USG's and remote IPSec router's identities but takes more time to establish the IKE SA.

- Aggressive is faster but does not encrypt the identities.

The ZyWALL/USG and the remote IPSec router must use the same negotiation mode. Multiple SAs connecting through a secure gateway must have the same negotiation mode.

- Encryption Algorithm: This displays the encryption method used. The longer the key, the higher the security, the lower the throughput (possibly).

  • DES uses a 56-bit key.
    • 3DES uses a 168-bit key.
    • AES128 uses a 128-bit key.
    • AES192 uses a 192-bit key.
    • AES256 uses a 256-bit key.

- Authentication Algorithm: This displays the authentication algorithm used. The stronger the algorithm, the slower it is.

• MD5 gives minimal security.
• SHA1 gives higher security.
• SHA256 gives the highest security.

• Active Protocol: This displays ESP (compatible with NAT) or AH.
- Encapsulation: This displays Tunnel (compatible with NAT) or Transport.
- Encryption Algorithm: This displays the encryption method used. The longer the key, the higher the security, the lower the throughput (possibly).

• DES uses a 56-bit key.
• 3DES uses a 168-bit key.
- AES128 uses a 128-bit key.
• AES192 uses a 192-bit key.
• AES256 uses a 256-bit key.
- Null uses no encryption.

- Authentication Algorithm: This displays the authentication algorithm used. The stronger the algorithm, the slower it is.

• MD5 gives minimal security.
• SHA1 gives higher security.
• SHA256 gives the highest security.

The Configuration for Secure Gateway displays the configuration that the Zyxel Device IPSec VPN Client will get from the Zyxel Device.

Click Save to save the VPN rule.

4.4.9 VPN Settings for Configuration Provisioning Advanced Wizard - Finish

The rule is now configured on the Zyxel Device. The Phase 1 rule settings appear in the VPN > IPSec VPN > VPN Gateway screen and the Phase 2 rule settings appear in the VPN > IPSec VPN > VPN Connection screen. Enter the IP address of the Zyxel Device in the Zyxel Device IPSec VPN Client to get all these VPN settings automatically from the Zyxel Device.

Figure 91 VPN for Configuration Provisioning Advanced Wizard: Finish
VPN Setup Wizard Wizard Type > VPN Settings > Wizard Completed 1 2 3 Advanced Settings Congratulations. The VPN Access wizard is completed Summary Rule Name: Test Secure Gateway: Any My Address (interface): wan1 Pre-Shared Key: testtest Phase 1 Negotiation Mode: main Encryption Algorithm: aes128 Authentication Algorithm: sha Key Group: DH2 SA Life Time: 86400 NAT Traversal: true Dead Peer Detection (DPD): true Phase 2 Active Protocol: esp Encapsulation: tunnel Encryption Algorithm: aes128 Authentication Algorithm: sha SA Life Time: 28800 Perfect Forward Secrecy (PFS): group2 Policy Local Policy (IP/Mask): 0.0.0.0 / 255.255.255.0 Remote Policy (IP/Mask): Any Nailed-Up: false Now it you are doing first time installation of this device, you may click this portal.myzyxel.com link and to register this device and activate trial service of advanced security features.(You need to have internet access to register) Close

Click Close to exit the wizard.

4.5 VPN Settings for L2TP VPN Settings Wizard

Use VPN Settings for L2TP VPN Settings to set up an L2TP VPN rule. Click Configuration > Quick Setup > VPN Setup and select VPN Settings for L2TP VPN Settings to see the following screen.

Figure 92 VPN Settings for L2TP VPN Settings Wizard: L2TP VPN Settings
VPN Setup Wizard Wizard Type > VPN Settings > Wizard Completed 1 2 3 Welcome ◎ VPN Settings - Wizard Type - VPN Settings - Wizard Completed ◎ VPN Settings for Configuration Provisioning - Wizard Type - VPN Settings - Wizard Completed ◎ VPN Settings for L2TP VPN Settings - VPN Settings - General Settings - Wizard Completed Upon completion of the Wizard Setup i. VPN Tunnel and VPN Gateway are automatically configured/generated ii. Policy Route is automatically configured/generated Next >

Click Next to continue the wizard.

4.5.1 L2TP VPN Settings

Figure 93 VPN Settings for L2TP VPN Settings Wizard: L2TP VPN Settings
VPN Setup Wizard VPN Settings > General Settings > Wizard Completed 1 2 3 L2TP VPN Settings Rule Name: WIZ_L2TP_VPN Phase 1 Setting My Address (interface): wan1 Authentication Method Pre-Shared Key: ! < Back Next >

  • Rule Name: Type the name used to identify this L2TP VPN connection (and L2TP VPN gateway). You may use 1-31 alphanumeric characters, underscores (_), or dashes (-), but the first character cannot be a number. This value is case-sensitive.
  • My Address (interface): Select one of the interfaces from the pull down menu to apply the L2TP VPN rule.

  • Pre-Shared Key: Type the password. Both ends of the VPN tunnel must use the same password. Use 8 to 31 case-sensitive ASCII characters or 8 to 31 pairs of hexadecimal ("0-9", "A-F") characters. Proceed a hexadecimal key with "0x". You will receive a PYLD_MALFORMED (payload malformed) packet if the same pre-shared key is not used on both ends.

  • Click Next to continue the wizard.

4.5.2 L2TP VPN Settings

Figure 94 VPN Settings for L2TP VPN Settings Wizard: L2TP VPN Settings
VPN Setup Wizard VPN Settings > General Settings > Wizard Completed 1 2 3 L2TP VPN Settings IP Address Pool: RANGE Starting IP Address: 0.0.0.0 End IP Address: 0.0.0.0 First DNS Server (Optional): Second DNS Server (Optional): ✓ Allow L2TP traffic Through WAN < Back Next >

  • IP Address Pool: Select RANGE or SUBNET from the pull down menu. This IP address pool is used to assign to the L2TP VPN clients.
  • Starting IP Address: Enter the starting IP address in the field.
  • End IP Address: Enter the ending IP address in the field.
    • Network: Enter the IPv4 IP address in this field if you selected SUBNET.
  • Netmask: Enter the associated subnet mask of the subnet in this field.
  • First DNS Server (Optional): Enter the first DNS server IP address in the field. Leave the field as 0.0.0.0 if you do not want to configure DNS servers. If you do not configure a DNS server you must know the IP address of a machine in order to access it.
  • Second DNS Server (Optional): Enter the second DNS server IP address in the field. Leave the field as 0.0.0.0 if you do not want to configure DNS servers. If you do not configure a DNS server you must know the IP address of a machine in order to access it.
  • Allow L2TP traffic Through WAN: Select this check box to allow traffic from L2TP clients to go to the Internet.

Click Next to continue the wizard.

Note: DNS (Domain Name System) is for mapping a domain name to its corresponding IP address and vice versa. The DNS server is extremely important because without it, you must know the IP address of a computer before you can access it. The Zyxel Device uses a system DNS server (in the order you specify here) to resolve domain names for VPN, DDNS and the time server.

4.5.3 VPN Settings for L2TP VPN Setting Wizard - Summary

This is a read-only summary of the L2TP VPN settings.

Figure 95 VPN Settings for L2TP VPN Settings Advanced Settings Wizard: Summary
VPN Setup Wizard Wizard Type > VPN Settings > Wizard Completed 1 2 3 Express Settings Summary Rule Name: WIZ_L2TP_VPN Secure Gateway: Any Pre-Shared Key: hesttest My Address (Interface): wan1 IP Address Pool: RANGE: 0.0.0.0 - 0.0.0.0 Click "Save" button to write the VPN configuration to ZyWALL. < Back Save

  • Rule Name: Identifies the L2TP VPN connection (and the L2TP VPN gateway).
  • Secure Gateway: Any displays in this field because it is not configurable in this wizard. It allows incoming connections from the L2TP VPN Client.
    • Pre-Shared Key: L2TP VPN tunnel password.
  • My Address (Interface): This displays the interface to use on your Zyxel Device for the L2TP tunnel.
  • IP Address Pool: This displays the IP address pool used to assign to the L2TP VPN clients.

Click Save to complete the L2TP VPN Setting and the following screen will show.

4.5.4 VPN Settings for L2TP VPN Setting Wizard - Completed

Figure 96 VPN Settings for L2TP VPN Settings Wizard: Finish
VPN Setup Wizard Wizard Type > VPN Settings > Wizard Completed 1 2 3 L2TP VPN Settings Congratulations. The VPN Access wizard is completed Summary Rule Name: WIZ_L2TP_VFN My Address (Interface): wan! Pre-Shared Key: testtest IP Address Pool: RANGE, 0.0.0.0 - 0.0.0.0 Now if you are doing first time installation of this device, you may click this portal.myzyxel.com link and to register this device and activate trial service of advanced security features.(You need to have internet access to register) Close

Te rule is now configured on the Zyxel Device. The L2TP VPN rule settings appear in the Configuration >VPN > L2TP VPN screen and also in the Configuration >VPN > IPSec VPN > VPN Connection and VPN Gateway screen.

CHAPTER 5 Dashboard

5.1 Overview

Use the Dashboard screens to check status information about the Zyxel Device.

5.1.1 What You Can Do in this Chapter

Use the main Dashboard screen to see the Zyxel Device's general device information, system status, and system resource usage. You can also display other status screens for more information.

Use the Dashboard screens to view the following.

• Device Information Screen on page 115
• System Status Screen on page 116
• Tx/Rx Statistics on page 116
• The Latest Logs Screen on page 117
• System Resources Screen on page 117
• DHCP Table Screen on page 118
• Number of Login Users Screen on page 119
• Current Login User on page 120
• VPN Status on page 120
- SSL VPN Status on page 121
• The Advanced Threat Protection Screen on page 121

5.2 The General Screen

The Dashboard screen displays when you log into the Zyxel Device or click Dashboard in the navigation panel. The dashboard displays general device information, system status, system resource usage, licensed service status, and interface status in widgets that you can re-arrange to suit your needs. You can also collapse, refresh, and close individual widgets.

Click on the icon to go to the OneSecurity website where there is guidance on configuration walkthroughs, troubleshooting, and other information.

The following screen is an example of a Brand 2.0 web configurator web style.

Figure 97 Dashboard USG FLEX
ZYXEL USG FLEX 500 General Advanced Threat Protection CPU Usage 29 % Memory Usage 25 % Flash Usage 10 % USB Storage Usage 0/0 MB Active Sessions 142/1000000 DHCP Table Q Host(a) Device HA 0 Switch Counter Number of Login Users 1 Current Login User Virtual Device ZYXEL USG FLEX ZYNALL Security Device Information System Name usgflex500 Serial Number S162145290122 MAC Address Range BB:EC:A3:13:72:F4 - BB:EC:A3:13:72:F8 Firmware Version V4.50(ABUJ.0)b2 / 2019-12-19 18:04:54 System Status Boot Status OK System Uptime 04:28:51 Current Date/Time 2020-02-06 / 07:43:29 U1C:00:00 Tx/Rx Statistics Port Selection: 1.000 Mbps —— Tx — —— Rx

The following table describes the labels in this screen.

Table 20 Dashboard

LABEL DESCRIPTION
Refresh NowClick this to update the widget's information immediately.
Virtual Device
Rear PanelClick this to view details about the Zyxel Device's rear panel. Hover your cursor over a connected interface or slot to display status details.
Front PanelClick this to view details about the status of the Zyxel Device's front panel LEDs and connections. See Section 3.1.1 on page 70 for LED descriptions. An unconnected interface or slot appears grayed out.
The following front and rear panel labels display when you hover your cursor over a connected interface or slot.
Name This fielddisplays the name of each interface.
StatusThis field displays the current status of each interface or device installed in a slot. The possible values depend on what type of interface it is.Inactive- The Ethernet interface is disabled.Down- The Ethernet interface does not have any physical ports associated with it or the Ethernet interface is enabled but not connected.Speed / Duplex- The Ethernet interface is enabled and connected. This field displays the port speed and duplex setting (Full or Half).The status for a WLAN card isnone.For cellular (mobile broadband) interfaces, seeSection 9.6 on page 265for the status that can appear.For the auxiliary interface:Inactive- The auxiliary interface is disabled-connected- The auxiliary interface is enabled and connected.Disconnected- The auxiliary interface is not connected.
ZoneThis field displays the zone to which the interface is currently assigned.
IP Address/ MaskThis field displays the current IP address and subnet mask assigned to the interface. If the interface is a member of an active virtual router, this field displays the IP address it is currently using. This is either the static IP address of the interface (if it is the master) or the management IP address (if it is a backup).

5.2.1 Device Information Screen

The Device Information screen displays Zyxel Device's system and model name, serial number, MAC address and firmware version shown in the below screen.

Figure 98 Dashboard > Device Information (Example)
Device Information System Name TWFWNT01650-4 Serial Number S162L45290122 MAC Address Range B8:EC:A3:13:72:F4 ~ B8:EC:A3:13:72:FB Firmware Version V4.50(ABUJ.0)b4s1 / 2020-03-13 23:56:10

This table describes the fields in the above screen.

Table 21 Dashboard > Device Information

LABEL DESCRIPTION
System NameThis field displays the name used to identify the Zyxel Device on any network. Click the link and open the Host Name screen where you can edit and make changes to the system and domain name.
Serial NumberThis field displays the serial number of this Zyxel Device. The serial number is used for device tracking and control.

Table 21 Dashboard > Device Information

LABEL DESCRIPTION
MAC Address RangeThis field displays the MAC addresses used by the Zyxel Device. Each physical port has one MAC address. The first MAC address is assigned to physical port 1, the second MAC address is assigned to physical port 2, and so on.
Firmware VersionThis field displays the version number and date of the firmware the Zyxel Device is currently running. Click the link to open the Firmware Package screen where you can upload firmware.

5.2.2 System Status Screen

Figure 99 Dashboard > System Status (Example)
System Status Boot Status Firmware update OK System Uptime 01:14:08 Current Date/Time 2018-01-03 / 09:12:41 UTC+00:00

This table describes the fields in the above screen.

Table 22 Dashboard > System Status

LABEL DESCRIPTION
Boot Status This field displays details about the Zyxel Device's startup state.OK - The Zyxel Device started up successfully.Firmware update OK - A firmware update was successful.Problematic configuration after firmware update - The application of the configuration failed after a firmware upgrade.System default configuration - The Zyxel Device successfully applied the system default configuration. This occurs when the Zyxel Device starts for the first time or you intentionally reset the Zyxel Device to the system default settings.Fallback to lastgood configuration - The Zyxel Device was unable to apply the startup-config.conf configuration file and fell back to the lastgood.conf configuration file.Fallback to system default configuration - The Zyxel Device was unable to apply the lastgood.conf configuration file and fell back to the system default configuration file (system-default.conf).Booting in progress - The Zyxel Device is still applying the system configuration.
System UptimeThis field displays how long the Zyxel Device has been running since it last restarted or was turned on.
Current Date/TimeThis field displays the current date and time in the Zyxel Device. The format is yyyy-mm-dd hh:mm:ss. Click on the link to see the Date/Time screen where you can make edits and changes to the date, time and time zone information.

5.2.3 Tx/Rx Statistics

This screen displays a line graph of packet statistics for each physical port.

Figure 100 Dashboard > Tx/Rx Statistics
ZYXEL USGFLEX700-GB0101F - Tx/Rx Statistics - 1

line | Time | Tx/Rx Statistics | |------|------------------| | 08:00 | 3.600 | | 10:00 | 3.600 | | 11:00 | 3.600 | | 12:00 | 3.600 | | 13:00 | 3.600 | | 14:00 | 3.600 | | 15:00 | 3.600 | | 16:00 | 3.600 | | 17:00 | 3.600 | | 18:00 | 3.600 | | 19:00 | 3.600 | | 20:00 | 3.600 | | 21:00 | 3.600 | | 22:00 | 3.600 | | 23:00 | 3.600 |

This table describes the fields in the above screen.

Table 23 Dashboard > The Lastest Logs

LABEL DESCRIPTION
MbpsThe y-axis represents the speed of transmission or reception.
TimeThe x-axis shows the time period over which the transmission or reception occurred.

5.2.4 The Latest Logs Screen

Figure 101 Dashboard > The Lastest Logs

#TimePriorityCategoryMessage *SourceDestination
12018-01-04 01:00:06cleriap-firmwareAP firmware download failed, Reason: Device can't connect to cloud server.
22018-01-04 01:20:33cleriap-firmwareAP firmware download failed, Reason: Device can't connect to cloud server.
32018-01-04 01:27:32cleriap-firmwareAP firmware download failed, Reason: Device can't connect to cloud server.
42018-01-04 01:29:24cleriap-firmwareAP firmware download failed, Reason: Device can't connect to cloud server.
52018-01-04 01:25:06cleriap-firmwareAP firmware download failed, Reason: Device can't connect to cloud server.

This table describes the fields in the above screen.

Table 24 Dashboard > The Lastest Logs

LABEL DESCRIPTION
# This is the entry's rank in the list of alert logs.
Time This field displays the date and time the log was created.
Priority This field displays the severity of the log.
Category This field displays the type of log generated.
Message This field displays the actual log message.
SourceThis field displays the source address (if any) in the packet that generated the log.
DestinationThis field displays the destination address (if any) in the packet that generated the log.

5.2.5 System Resources Screen

Click the bar to see a graphic on that resource.

Figure 102 Dashboard > System Resources
ZYXEL USGFLEX700-GB0101F - System Resources Screen - 1

bar | Category | Percentage (%) | | :--- | :--- | | CPU Usage | 3 | | Memory Usage | 39 | | Flash Usage | 10 | | USB Storage Usage | 0/0 MB | | Active Sessions | 149/600000 |

This table describes the fields in the above screen.

Table 25 Dashboard > System Resources

LABEL DESCRIPTION
CPU UsageThis field displays what percentage of the Zyxel Device's processing capability is currently being used. Hover your cursor over this field to display the Show CPU Usage icon that takes you to a chart of the Zyxel Device's recent CPU usage.
Memory UsageThis field displays what percentage of the Zyxel Device's RAM is currently being used. Hover your cursor over this field to display the Show Memory Usage icon that takes you to a chart of the Zyxel Device's recent memory usage.
Flash UsageThis field displays what percentage of the Zyxel Device's onboard flash memory is currently being used.
USB Storage UsageThis field shows how much storage in the USB device connected to the Zyxel Device is in use.
Active SessionsThis field shows how many sessions, established and non-established, that pass through/from/to/within the ZyWALL. Hover your cursor over this field to display icons. Click the Detail icon to go to the Session Monitor screen to see details about the active sessions. Click the Show Active Sessions icon to display a chart of Zyxel Device's recent session usage.

5.2.6 DHCP Table Screen

Click on the number to look at the IP addresses currently assigned to DHCP clients and the IP addresses reserved for specific MAC addresses. The following screen will show.

Figure 103 Dashboard > DHCP Table
DHCP Table Refresh Interval: 5 minutes Refresh Now Interface IP Address Host Na... MAC Address Expiration... Descript... Re... Page 0 of 0 Show 50 items No data to display Cancel

This table describes the fields in the above screen.

Table 26 Dashboard > DHCP Table

LABEL DESCRIPTION
Refresh Interval Select how often you want this window to be updated automatically.
Refresh NowClick this to update the information in the window right away.
#This field is a sequential value, and it is not associated with a specific entry.
Interface This field identifies the interface that assigned an IP address to a DHCP client.
IP AddressThis field displays the IP address currently assigned to a DHCP client or reserved for a specific MAC address. Click the column's heading cell to sort the table entries by IP address. Click the heading cell again to reverse the sort order.
Host NameThis field displays the name used to identify this device on the network (the computer name). The Zyxel Device learns these from the DHCP client requests. "None" shows here for a static DHCP entry.
MAC AddressThis field displays the MAC address to which the IP address is currently assigned or for which the IP address is reserved. Click the column's heading cell to sort the table entries by MAC address. Click the heading cell again to reverse the sort order.
Expiration TimeThis is the period of time DHCP-assigned addresses is used.
DescriptionFor a static DHCP entry, the host name or the description you configured shows here. This field is blank for dynamic DHCP entries.
ReserveIf this field is selected, this entry is a static DHCP entry. The IP address is reserved for the MAC address.If this field is clear, this entry is a dynamic DHCP entry. The IP address is assigned to a DHCP client.To create a static DHCP entry using an existing dynamic DHCP entry, select this field, and then clickApply.To remove a static DHCP entry, clear this field, and then clickApply.

5.2.7 Number of Login Users Screen

Click the Number of Login Users link to see the following screen.

Figure 104 Dashboard > Number of Login Users
Number of Login Users User ID ▲ Reauth/Lease Time Session Tim... Type IP Address User Info Force Logout 1 admin unlimited / 00:29:59 unlimited http/https 10.214.80.33 admin(ad... Logout

This table describes the fields in the above screen.

Table 27 Dashboard > Number of Login Users

LABEL DESCRIPTION
#This field is a sequential value and is not associated with any entry.
User IDThis field displays the user name of each user who is currently logged in to the Zyxel Device.
Reauth/Lease TimeThis field displays the amount of reauthentication time remaining and the amount of lease time remaining for each user.
Session TimeoutThis field displays the total account of time the account (authenticated by an external server) can use to log into the UAG or access the Internet through the Zyxel Device.This shows unlimited for an administrator account.
TypeThis field displays the way the user logged in to the Zyxel Device.
IP addressThis field displays the IP address of the computer used to log in to the Zyxel Device.
User InfoThis field displays the types of user accounts the Zyxel Device uses. If the user type isext-user(external user), this field will show its external-group information when you move your mouse over it.If the external user matches two external-group objects, both external-group object names will be shown.
Force Logout Click this icon to end a user's session.

5.2.8 Current Login User

This field displays the user name used to log in to the current session, the amount of reauthentication time remaining, and the amount of lease time remaining.

Figure 105 Dashboard > Current Login User
ZYXEL USGFLEX700-GB0101F - Current Login User - 1

5.2.9 VPN Status

Click on the link to look at the VPN tunnels that are currently established.

Figure 106 Dashboard > VPN Status
VPN Status Name ▲ Encapsulation Algorithm Refresh Interval: 5 minutes Refresh Now

This table describes the fields in the above screen.

Table 28 Dashboard > VPN Status

LABEL DESCRIPTION
#This field is a sequential value and is not associated with any entry.
Name This field displays the name of the VPN tunnel.
EncapsulationThis field displays the type of encapsulation the VPN tunnel uses.
AlgorithmThis field displays the hash algorithm that the VPN tunnel uses to authenticate packet data.
Refresh Interval Select how often you want this window to be updated automatically.
Refresh NowClick this to update the information in the window right away.

5.2.10 SSL VPN Status

The first number is the actual number of VPN tunnels up and the second number is the maximum number of SSL VPN tunnels allowed.

Figure 107 Dashboard > SSL VPN Status
SSL VPN Status 0/10

5.3 The Advanced Threat Protection Screen

Use the Advanced Threat Protection screen to check security status information about the Zyxel Device.

Figure 108 Dashboard > Advanced Threat Protection - USG FLEX Series
General Advanced Thread Protection CPU Usage 9 % Memory Usage 23 % Flash Usage 10 % USB Storage Usage 0/0 X/B Active Sessions 85/1000000 DHCP Table Q Host(s) Device HA 0 Switch Counter Number of Login Users 1 Current Login User admin 22:11:47 / 23:39:49 VPN Status 0 Virtual Device ZYXEL USB FLEX SYXUS Security Device Information System Name TWPWNT91690-4 Serial Number S162L45290122 MAC Address Range BB:BC:A3:13:72:F4 - B8:BC:A3:13:72:FB Firmware Version V4.40(ABU.0)6:4:1 / 2020-03-13 23:46:10 System Status Boot Status OK System uptime 3 days, 07:58:14 Current Date/Time 2020-03-30 / 16:18:29 UTC+08:00 Tx/Rx Statistics Port Selection: P1 1,000 Mbps — Tx — Rx The Latest Logs Time Priority Category Message Source Destination 1 2020-05-30 16:14:20 alert Security Policy Control abnormal upa traffic ... 172.21.40.17:10001 255.255.255.255

This screen gives the following information:

• The amount of scanned traffic
- The number of scanned connections for URL Threat filtering
- The number of scanned files for anti-malware
• The number of scanned connections for IDP
- The number of scanned emails for email security
- The number of the scanned sites for content filtering
- Top 5 applications that are used the most
- Top 5 URLs that are detected the most
• Reputation filter reports
- URL Threat filter reports
- Threat statistics

Click the Refresh icon to update the information in the window right away.

PART II

Technical Reference

CHAPTER 6 Monitor

6.1 Overview

Use the Monitor screens to check status and statistics information.

6.1.1 What You Can Do in this Chapter

Use the Monitor screens for the following.

  • Use the System Status > Port Statistics screen (see Section 6.2 on page 126) to look at packet statistics for each physical port.
  • Use the System Status > Port Statistics > Graph View screen (see Section 6.2 on page 126) to look at a line graph of packet statistics for each physical port.
  • Use the System Status > Interface Status screen (Section 6.3 on page 128) to see all of the Zyxel Device's interfaces and their packet statistics.
  • Use the System Status > Traffic Statistics screen (see Section 6.4 on page 132) to start or stop data collection and view statistics.
  • Use the System Status > Session Monitor screen (see Section 6.5 on page 135) to view sessions by user or service.
  • Use the System Status > Login Users screen (Section 6.6 on page 137) to look at a list of the users currently logged into the Zyxel Device.
  • Use the System Status > Dynamic Guest screen (Section 6.7 on page 138) to look at a list of the automatically created users allowed to access the Zyxel Device's service.
  • Use the System Status > IGMP Statistics screen (see Section 6.8 on page 139) to view multicasting details.
  • Use the System Status > DDNS Status screen (see Section 6.9 on page 140) to view the status of the Zyxel Device's DDNS domain names.
  • Use the System Status > IP/MAC Binding screen (Section 6.10 on page 141) to view a list of devices that have received an IP address from Zyxel Device interfaces with IP/MAC binding enabled.
  • Use the System Status > Cellular Status screen (Section 6.11 on page 142) to check your mobile broadband connection status.
  • Use the System Status > UPnP Port Status screen (see Section 6.12 on page 145) to look at a list of the NAT port mapping rules that UPnP creates on the Zyxel Device.
  • Use the System Status > USB Storage screen (Section 6.13 on page 146) to view information about a connected USB storage device.
  • Use the System Status > Ethernet Neighbor screen (Section 6.14 on page 147) to view and manage the Zyxel Device's neighboring devices via Layer Link Discovery Protocol (LLDP).
  • Use the System Status > FQDN Object screen (Section 6.15 on page 148) to display fully qualified domain name (FQDN) object cache lists used in DNS queries.
  • Use the System Status > Virtual Server LB screen (Section 6.16 on page 150) to display distribution of incoming connection requests to a virtual server between multiple real (physical) servers.

  • Use the Wireless > AP Information > AP List screen (Section 6.17 on page 151) to display which APs are currently connected to the Zyxel Device.

  • Use the Wireless > AP Information > Radio List screen (Section 6.18 on page 161) to display statistics about the wireless radio transmitters in each of the APs connected to the Zyxel Device.
  • Use the Wireless > AP Information > Top N APs screen (Section 6.19 on page 165) to view managed APs with the most wireless traffic usage and most associated wireless stations.
  • Use the Wireless > AP Information > Single AP screen (Section 6.20 on page 166) to view APs wireless traffic usage and associated wireless stations for a managed AP.
  • Use the Wireless > ZyMesh screen (Section 6.21 on page 167) to display statistics about the ZyMesh wireless connections between the managed APs.
  • Use the Wireless > SSID Info screen (Section 6.22 on page 168) to display the number of wireless clients that are currently connected to an SSID and the SSID's security mode.
  • Use the Wireless > Station Info > Station List screen (Section 6.23 on page 169) to view information on connected wireless stations.
  • Use the Wireless > Station Info > Top N Stations screen (Section 6.24 on page 170) to view wireless stations with the most wireless traffic usage.
  • Use the Wireless > Station Info > Single Station screen (Section 6.25 on page 171) to view wireless traffic usage for an associated wireless station.
  • Use the Wireless > Detected Device screen (Section 6.26 on page 172) to view information about suspected rogue APs.
  • Use the Printer Status screen (see Section 6.27 on page 173) to view information about the connected statement printers.
  • Use the VPN Monitor > IPSec screen (Section 6.28 on page 174) to display and manage active IPSec SAs.
  • Use the VPN Monitor > SSL screen (see Section 6.29 on page 175) to list the users currently logged into the VPN SSL client portal. You can also log out individual users and delete related session information.
  • Use the VPN Monitor > L2TP over IPSec screen (see Section 6.30 on page 176) to display and manage the Zyxel Device's connected L2TP VPN sessions.
  • Use the Security Statistics > Content Filter screen (Section 6.32 on page 178) to start or stop data collection and view content filter statistics.
  • Use the Security Statistics > App Patrol screen (see Section 6.31 on page 177) to start or stop data collection and view application statistics
  • Use the Security Statistics > Anti-Malware screen (see Section 6.33 on page 179) to start or stop data collection and view malware statistics.
  • Use the Security Statistics > Reputation Filter screen (see Section 6.34 on page 182) to view statistics of IP reputation and URL Threat filtering.
  • Use the Security Statistics > IDP screen (Section 6.35 on page 183) to start or stop data collection and view IDP statistics.
  • Use the Security Statistics > Email Security > Summary screen (Section 6.36 on page 185) to start or stop data collection and view spam statistics.
  • Use the Security Statistics > Email Security > Status screen (Section 6.36.2 on page 187) to see how many mail sessions the Zyxel Device is currently checking and DNSBL statistics.
  • Use the Security Statistics > SSL Inspection screen (Section 6.37 on page 188) to see a report on SSL Inspection and a certificate cache list.
  • Use the Log > View Log screen (see Section 6.38.1 on page 191) to view the Zyxel Device's current log messages. You can change the way the log is displayed, you can email the log, and you can also clear the log in this screen.

  • Use the Log > View AP Log screen (see Section 6.38.2 on page 192) to view the Zyxel Device's current wireless AP log messages.

  • Use the Log > Dynamic Users Log screen (see Section 6.38.3 on page 194) to view the Zyxel Device's dynamic guest account log messages.

6.2 The Port Statistics Screen

Use this screen to look at packet statistics for each Gigabit Ethernet port. To access this screen, click Monitor > System Status > Port Statistics.

Figure 109 Monitor > System Status > Port Statistics
Port Statistics General Settings Poll Interval: 5 (1-60 seconds) Set Interval Stop Statistics Table Switch To Graphic View Port→ Status TxPkts RxPkts Collisions Tx B/s Rx B/s Up Time 1 1 Down 0 0 0 0 0 00:00:00 2 2 1000M/Full 394490 524916 0 0 192 22:32:24 3 3 Down 0 0 0 0 0 00:00:00 4 4 Down 0 0 0 0 0 00:00:00 5 5 Down 0 0 0 0 0 00:00:00 6 6 Down 0 0 0 0 0 00:00:00 7 7 Down 0 0 0 0 0 00:00:00 Page 1 of 1 Show 50 items Displaying 1 -7 of 7 System Up Time: 22:34:25

The following table describes the labels in this screen.

Table 29 Monitor > System Status > Port Statistics

LABEL DESCRIPTION
Poll IntervalEnter how often you want this window to be updated automatically, and click Set Interval.
Set IntervalClick this to set the Poll Interval the screen uses.
StopClick this to stop the window from updating automatically. You can start it again by setting the Poll Interval and clicking Set Interval.
Switch to Graphic ViewClick this to display the port statistics as a line graph.
# This field is a sequential value, and it is not associated with a specific port.
Port This field displays the physical port number.
Status This field displays the current status of the physical port. Down - The physical port is not connected. Speed / Duplex - The physical port is connected. This field displays the port speed and duplex setting (Full or Half).
TxPktsThis field displays the number of packets transmitted from the Zyxel Device on the physical port since it was last connected.
RxPktsThis field displays the number of packets received by the Zyxel Device on the physical port since it was last connected.
CollisionsThis field displays the number of collisions on the physical port since it was last connected.
LABEL DESCRIPTION
Tx B/sThis field displays the transmission speed, in bytes per second, on the physical port in the one-second interval before the screen updated.
Rx B/sThis field displays the reception speed, in bytes per second, on the physical port in the one-second interval before the screen updated.
Up Time This field displays how long the physical port has been connected.
System Up TimeThis field displays how long the Zyxel Device has been running since it last restarted or was turned on.

6.2.1 The Port Statistics Graph Screen

Use this screen to look at a line graph of packet statistics for each physical port. To access this screen, click Port Statistics on the Status screen and then the Switch to Graphic View Button.

Figure 110 Monitor > System Status > Port Statistics > Switch to Graphic View
ZYXEL USGFLEX700-GB0101F - The Port Statistics Graph Screen - 1

line | Time | TX | RX | | -------- | ---- | ---- | | 06:31 | 0.9 | 0.9 |

The following table describes the labels in this screen.

Table 30 Monitor > System Status > Port Statistics > Switch to Graphic View

LABEL DESCRIPTION
Refresh Interval Enter how often you want this window to be automatically updated.
Refresh NowClick this to update the information in the window right away.
Port SelectionSelect the number of the physical port for which you want to display graphics.
Switch to Grid ViewClick this to display the port statistics as a table.
bps The y-axis represents the speed of transmission or reception.
timeThe x-axis shows the time period over which the transmission or reception occurred
TXThis line represents traffic transmitted from the Zyxel Device on the physical port since it was last connected.
RXThis line represents the traffic received by the Zyxel Device on the physical port since it was last connected.
Last UpdateThis field displays the date and time the information in the window was last updated.

6.3 Interface Status Screen

This screen lists all of the Zyxel Device's interfaces and gives packet statistics for them. Click Monitor > System Status > Interface Summary to access this screen.

Figure 111 Monitor > System Status > Interface Summary

Interface Summary
Interface Status
NamePort/Bit...StatusZoneIP Addr/...IP Assign...ServicesAction
- sfpP1DownOPT0.0.0.0 / ...Staticn/an/a
- sfp_pppP1InactiveOPT0.0.0.0 / ...Dynamicn/an/a
- wan1P21000M/FullWAN172.21.4...DHCP cli...n/aRenew
- wan1_pppP2InactiveWAN0.0.0.0 / ...Dynamicn/an/a
- wan2P3DownWAN0.0.0.0 / ...DHCP cli...n/aRenew
- wan2_pppP3InactiveWAN0.0.0.0 / ...Dynamicn/an/a
- lan1P4, P5, P6DownLAN1192.168....StaticDHCP se...n/a
- lan2n/aDownLAN2192.168....StaticDHCP se...n/a
- dmzn/aDownDMZ192.168....StaticDHCP se...n/a
- reservedP7Downn/a0.0.0.0 / ...Staticn/an/a

Each field is described in the following table.

Table 31 Monitor > System Status > Interface Summary

LABEL DESCRIPTION
Interface StatusIf an Ethernet interface does not have any physical ports associated with it, its entry is displayed in light gray text.
NameThis field displays the name of each interface. If there is an Expand icon (plus-sign) next to the name, click this to look at the status of virtual interfaces on top of this interface.
Port/Binding This field displays the physical port number.

Table 31 Monitor > System Status > Interface Summary

LABEL DESCRIPTION
StatusThis field displays the current status of each interface. The possible values depend on what type of interface it is.For Ethernet interfaces:Inactive- The Ethernet interface is disabled.Down- The Ethernet interface does not have any physical ports associated with it or the Ethernet interface is enabled but not connected.Speed/ Duplex- The Ethernet interface is enabled and connected. This field displays the port speed and duplex setting (Full or Half).For cellular (mobile broadband) interfaces, see Section 6.13 on page 146 the Web Help for the status that can appear.For the auxiliary interface:Inactive- The auxiliary interface is disabled-connected- The auxiliary interface is enabled and connected.Disconnected- The auxiliary interface is not connected.For virtual interfaces, this field always displays Up. If the virtual interface is disabled, it does not appear in the list.For VLAN and bridge interfaces, this field always displays Up. If the VLAN or bridge interface is disabled, it does not appear in the list.For PPP interfaces:Connected- The PPP interface is connected.Disconnected- The PPP interface is not connected.If the PPP interface is disabled, it does not appear in the list.For WLAN interfaces:Up- The WLAN interface is enabled.Down- The WLAN interface is disabled.
ZoneThis field displays the zone to which the interface is assigned.
IP Addr/NetmaskThis field displays the current IP address and subnet mask assigned to the interface. If the IP address and subnet mask are 0.0.0.0, the interface is disabled or did not receive an IP address and subnet mask via DHCP.If this interface is a member of an active virtual router, this field displays the IP address it is currently using. This is either the static IP address of the interface (if it is the master) or the management IP address (if it is a backup).
IP Assignment This field displays how the interface gets its IP address.Static- This interface has a static IP address.DHCP Client- This interface gets its IP address from a DHCP server.
ServicesThis field lists which services the interface provides to the network. Examples include DHCP relay, DHCP server, DDNS, RIP, and OSPF. This field displays n/a if the interface does not provide any services to the network.
ActionUse this field to get or to update the IP address for the interface. Click Renew to send a new DHCP request to a DHCP server. Click Connect to try to connect a PPPoE/PPTP interface. If the interface cannot use one of these ways to get or to update its IP address, this field displays n/a.
Tunnel Interface StatusThis displays the details of the Zyxel Device's configured tunnel interfaces.
Name This field displays the name of the interface.
StatusThe activate (light bulb) icon is lit when the entry is active and dimmed when the entry is inactive.

Table 31 Monitor > System Status > Interface Summary

LABEL DESCRIPTION
ZoneThis field displays the zone to which the interface is assigned.
IP AddressThis is the IP address of the interface. If the interface is active (and connected), the Zyxel Device tunnels local traffic sent to this IP address to the Remote Gateway Address.
My AddressThis is the interface or IP address uses to identify itself to the remote gateway. The Zyxel Device uses this as the source for the packets it tunnels to the remote gateway.
Remote Gateway AddressThis is the IP address or domain name of the remote gateway to which this interface tunnels traffic.
Mode This field displays the tunnel mode that you are using.
IPv6 Interface StatusIf an Ethernet interface does not have any physical ports associated with it, its entry is displayed in light gray text.
NameThis field displays the name of each interface. If there is an Expand icon (plus-sign) next to the name, click this to look at the status of virtual interfaces on top of this interface.
Port This field displays the physical port number.
StatusThis field displays the current status of each interface. The possible values depend on what type of interface it is.For Ethernet interfaces:Inactive - The Ethernet interface is disabled.Down - The Ethernet interface does not have any physical ports associated with it or the Ethernet interface is enabled but not connected.Speed / Duplex - The Ethernet interface is enabled and connected. This field displays the port speed and duplex setting (Full or Half).For cellular (mobile broadband) interfaces, see Section 6.13 on page 146 the Web Help for the status that can appear.For the auxiliary interface:Inactive - The auxiliary interface is disabled-connected - The auxiliary interface is enabled and connected.Disconnected - The auxiliary interface is not connected.For virtual interfaces, this field always displays Up. If the virtual interface is disabled, it does not appear in the list.For VLAN and bridge interfaces, this field always displays Up. If the VLAN or bridge interface is disabled, it does not appear in the list.For PPP interfaces:Connected - The PPP interface is connected.Disconnected - The PPP interface is not connected.If the PPP interface is disabled, it does not appear in the list.For WLAN interfaces:Up - The WLAN interface is enabled.Down - The WLAN interface is disabled.
ZoneThis field displays the zone to which the interface is assigned.
IP AddressThis field displays the current IPv6 address assigned to the interface. If the IPv6 address is ::, the interface is disabled or did not receive an IPv6 address via DHCP.If this interface is a member of an active virtual router, this field displays the IPv6 address it is currently using. This is either the static IPv6 address of the interface (if it is the master) or the management IPv6 address (if it is a backup).

Table 31 Monitor > System Status > Interface Summary

LABEL DESCRIPTION
ServicesThis field lists which services the interface provides to the network. Examples include DHCP relay, DHCP server, DDNS, RIP, and OSPF. This field displays n/a if the interface does not provide any services to the network.
ActionUse this field to get or to update the IP address for the interface. Click Renew to send a new DHCP request to a DHCP server. Click Connect to try to connect a PPPoE/PPTP interface. If the interface cannot use one of these ways to get or to update its IP address, this field displays n/a.
Interface Statistics
This table provides packet statistics for each interface.
Refresh Click this button to update the information on the screen.
NameThis field displays the name of each interface. If there is a Expand icon (plus-sign) next to the name, click this to look at the statistics for virtual interfaces on top of this interface.
Status This field displays the current status of the interface. · Down - The interface is not connected. · Speed / Duplex - The interface is connected. This field displays the port speed and duplex setting (Full or Half). This field displays Connected and the accumulated connection time (hh:mm:ss) when the PPP interface is connected.
TxPktsThis field displays the number of packets transmitted from the Zyxel Device on the interface since it was last connected.
RxPktsThis field displays the number of packets received by the Zyxel Device on the interface since it was last connected.
Tx B/sThis field displays the transmission speed, in bytes per second, on the interface in the one-second interval before the screen updated.
Rx B/sThis field displays the reception speed, in bytes per second, on the interface in the one-second interval before the screen updated.

6.4 The Traffic Statistics Screen

Click Monitor > System Status > Traffic Statistics to display the Traffic Statistics screen. This screen provides basic information about the following for example:

  • Most-visited Web sites and the number of times each one was visited. This count may not be accurate in some cases because the Zyxel Device counts HTTP GET packets. Please see Table 32 on page 133 for more information.
  • Most-used protocols or service ports and the amount of traffic on each one
    • LAN IP with heaviest traffic and how much traffic has been sent to and from each one

You use the Traffic Statistics screen to tell the Zyxel Device when to start and when to stop collecting information for these reports. You cannot schedule data collection; you have to start and stop it manually on the Traffic Statistics screen.

Figure 112 Monitor > System Status > Traffic Statistics
Traffic Statistics Data Collection ✓ Collect Statistics since 2018-01-04 Thu 06:40:11 to 2018-01-04 Thu 06:41:13 Apply Reset Statistics Interface: sfp Sort By: Host IP Address/Us Refresh Flush Data Direction IP Address/User Amount Page of 0 Show 50 items No data to display

There is a limit on the number of records shown in the report. Please see Table 33 on page 134 for more information. The following table describes the labels in this screen.

Table 32 Monitor > System Status > Traffic Statistics

LABEL DESCRIPTION
Data Collection
Collect StatisticsSelect this to have the Zyxel Device collect data for the report. If the Zyxel Device has already been collecting data, the collection period displays to the right. The progress is not tracked here real-time, but you can click the Refresh button to update it.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.
Statistics
InterfaceSelect the interface from which to collect information. You can collect information from Ethernet, VLAN, bridge and PPPoE/PPTP interfaces.
Sort By Select the type of report to display. Choices are:Host IP Address/ User - displays the IP addresses or users with the most traffic and how much traffic has been sent to and from each one.Service/ Port - displays the most-used protocols or service ports and the amount of traffic for each one.Web Site Hits - displays the most-visited Web sites and how many times each one has been visited.Country - displays the countries with the most traffic and the amount of traffic for each one.Each type of report has different information in the report (below).
Refresh Click this button to update the report display.
Flush DataClick this button to discard all of the screen's statistics and update the report display.
These fields are available when the Traffic Type is Host IP Address/ User.
#This field is the rank of each record. The IP addresses and users are sorted by the amount of traffic.
DirectionThis field indicates whether the IP address or user is sending or receiving traffic.Ingress- traffic is coming from the IP address or user to the Zyxel Device.Egress- traffic is going from the Zyxel Device to the IP address or user.
IP Address/UserThis field displays the IP address or user in this record. The maximum number of IP addresses or users in this report is indicated in Table 33 on page 134.
AmountThis field displays how much traffic was sent or received from the indicated IP address or user. If the Direction is Ingress, a red bar is displayed; if the Direction is Egress, a blue bar is displayed. The unit of measure is bytes, Kbytes, Mbytes or Gbytes, depending on the amount of traffic for the particular IP address or user. The count starts over at zero if the number of bytes passes the byte count limit. See Table 33 on page 134.These fields are available when the Traffic Type is Service/Port.
#This field is the rank of each record. The protocols and service ports are sorted by the amount of traffic.
Service/PortThis field displays the service and port in this record. The maximum number of services and service ports in this report is indicated in Table 33 on page 134.
Protocol This field indicates what protocol the service was using.
DirectionThis field indicates whether the indicated protocol or service port is sending or receiving traffic.Ingress- traffic is coming into the Zyxel Devicethrough the interfaceEgress- traffic is going out from the Zyxel Device through the interface
AmountThis field displays how much traffic was sent or received from the indicated service / port. If the Direction is Ingress, a red bar is displayed; if the Direction is Egress, a blue bar is displayed. The unit of measure is bytes, Kbytes, Mbytes, Gbytes, or Tbytes, depending on the amount of traffic for the particular protocol or service port. The count starts over at zero if the number of bytes passes the byte count limit. See Table 33 on page 134.
These fields are available when the Traffic Type is Web Site Hits.
#This field is the rank of each record. The domain names are sorted by the number of hits.
Web SiteThis field displays the domain names most often visited. The Zyxel Device counts each page viewed on a Web site as another hit. The maximum number of domain names in this report is indicated in Table 33 on page 134.
HitsThis field displays how many hits the Web site received. The Zyxel Device counts hits by counting HTTP GET packets. Many Web sites have HTTP GET references to other Web sites, and the Zyxel Device counts these as hits too. The count starts over at zero if the number of hits passes the hit count limit. See Table 33 on page 134.
These fields are available when the Traffic Type is Country.
#This field is the rank of each record. The country name is sorted by the amount of traffic.
DirectionThis field indicates whether the indicated protocol or service port is sending or receiving traffic.Ingress- traffic is coming into the Zyxel Devicethrough the interfaceEgress- traffic is going out from the Zyxel Device through the interface
Country NameThis field displays the name of the country.
Country This field displays the country code.
AmountThis field displays how much traffic was sent or received from the indicated country. If the Direction is Ingress, a red bar is displayed; if the Direction is Egress, a blue bar is displayed. The unit of measure is bytes, Kbytes, Mbytes, Gbytes, or Tbytes, depending on the amount of traffic for the particular protocol or service port. The count starts over at zero if the number of bytes passes the byte count limit. See Table 33 on page 134.Ingress- traffic is coming into the Zyxel Device from the country.Egress- traffic is going from the Zyxel Device to the country.

The following table displays the maximum number of records shown in the report, the byte count limit, and the hit count limit.

Table 33 Maximum Values for Reports

LABEL DESCRIPTION
Maximum Number of Records 20
Byte Count Limit 2 ^64 bytes; this is just less than 17 million terabytes.
Hit Count Limit 2 ^64 hits; this is over 1.8 × 10^19 hits.

6.5 The Session Monitor Screen

The Session Monitor screen displays all established sessions that pass through the Zyxel Device for debugging or statistical analysis. It is not possible to manage sessions in this screen. The following information is displayed.

  • User who started the session
  • Protocol or service port used
  • Source address
  • Destination address
    • Number of bytes received (so far)
    • Number of bytes transmitted (so far)
    • Duration (so far)

You can look at all established sessions that passed through the Zyxel Device by user, service, source IP address, or destination IP address. You can also filter the information by user, protocol / service or service group, source address, and/or destination address and view it by user.

Click Monitor > System Status > Session Monitor to display the following screen.

Figure 113 Monitor > System Status > Session Monitor
Session Monitor Forward Session View: all sessions Refresh User: Service: any Source Address: Destination Address: Source Country: any Destination Country: any Search Clear Clear All User ▲ Service Source Source C... Destination Destination Coun... Rx Tx Duration Page 0 of 0 Show 50 items No data to display

The following table describes the labels in this screen.

Table 34 Monitor > System Status > Session Monitor

LABEL DESCRIPTION
ViewSelect how you want the established sessions that passed through the Zyxel Device to be displayed. Choices are:sessions by users- display all active sessions grouped by usersessions by services- display all active sessions grouped by service or protocolsessions by source IP- display all active sessions grouped by source IP addresssession by source region- display all active sessions grouped by where the traffic is coming from by countrysessions by destination IP- display all active sessions grouped by destination IP addresssessions by destination region- display all active sessions grouped by where the traffic is going to by countryall sessions- filter the active sessions by the User, Service, Source Address, and Destination Address, and display each session individually (sorted by user).
RefreshClick this button to update the information on the screen. The screen also refreshes automatically when you open and close the screen.
LABEL DESCRIPTION
The User, Service, Source Address, Destination Address, Source Country and Destination Country fields display if you view all sessions. Select your desired filter criteria and click the Refresh button to filter the list of sessions.
UserThis field displays when View is set to all sessions. Type the user whose sessions you want to view. It is not possible to type part of the user name or use wildcards in this field; you must enter the whole user name.
ServiceThis field displays when View is set to all sessions. Select the service or service group whose sessions you want to view. The Zyxel Device identifies the service by comparing the protocol and destination port of each packet to the protocol and port of each services that is defined.
Source AddressThis field displays when View is set to all sessions. Type the source IP address whose sessions you want to view. You cannot include the source port.
Source CountryThis field displays when View is set to all sessions. Select the country where the traffic is coming from.
Destination AddressThis field displays when View is set to all sessions. Type the destination IP address whose sessions you want to view. You cannot include the destination port.
Destination CountryThis field displays when View is set to all sessions. Select the country where the traffic is going to.
SearchClick this to display all sessions in the table below according to the criteria you defined above.
Clear Clear AllAdministrators can use these buttons to forcibly terminate selected TCP/UDP connections. Select one or multiple connections and then click Clear; click Clear All to terminate all connections displayed. Cleared sessions display on the Log >View Log screen.
#This field is the rank of each record. The names are sorted by the name of user in active session. You can use the pull down menu on the right to choose sorting method.
User This field displays the user in each active session. If you are looking at the sessions by users (or all sessions) report, click + or - to display or hide details about a user's sessions.
ServiceThis field displays the protocol used in each active session. If you are looking at the sessions by services report, click + or - to display or hide details about a protocol's sessions.
SourceThis field displays the source IP address and port in each active session. If you are looking at the sessions by source IP report, click + or - to display or hide details about a source IP address's sessions.
Source CountryThis field displays the source country in each active session.
DestinationThis field displays the destination IP address and port in each active session. If you are looking at the sessions by destination IP report, click + or - to display or hide details about a destination IP address's sessions.
Destination CountryThis field displays the destination country in each active session.
RxThis field displays the amount of information received by the source in the active session.
TxThis field displays the amount of information transmitted by the source in the active session.
DurationThis field displays the length of the active session in seconds.

6.6 The Login Users Screen

Use this screen to look at a list of the users currently logged into the Zyxel Device. To access this screen, click Monitor > System Status > Login Users.

Figure 114 Monitor > System Status > Login Users
Login Users Current User List Force Logout U... Recurth/Lease Time Session Timeout Type IP... Country M... Us... Acct. Status RADIUS Profile Name 1 a... unlimited / 00:30:00 unlimited htt... 1... - - ad... - N/A 2 a... unlimited / 00:19:15 unlimited htt... 1... - C0... ad... - N/A Page 1 of 1 Show 50 items Displaying 1 - 2 of 2 Refresh

The following table describes the labels in this screen.

Table 35 Monitor > System Status > Login Users

LABEL DESCRIPTION
Force Logout Select a user ID and click this icon to end a user's session.
# This field is a sequential value and is not associated with any entry.
User IDThis field displays the user name of each user who is currently logged in to the Zyxel Device.
Reauth/Lease TimeThis field displays the amount of reauthentication time remaining and the amount of lease time remaining for each user.
Session TimeoutThis field displays the total account of time the account (authenticated by an external server) can use to log into the Zyxel Device or access the Internet through the Zyxel Device.This shows unlimited for an administrator account.
TypeThis field displays the way the user logged in to the Zyxel Device.
IP AddressThis field displays the IP address of the computer used to log in to the Zyxel Device.
CountryThe Internet Assigned Numbers Authority (IANA) has reserved the following blocks of Private IP addresses specifically for private networks:10.0.0.0-10.255.255.255172.16.0.0-172.31.255.255192.168.0.0-192.168.255.255224.0.0.0-239.255.255.255
MACThis field displays the MAC address of the computer used to log in to the Zyxel Device.
User InfoThis field displays the types of user accounts the Zyxel Device uses. If the user type is ext-user (external user), this field will show its external-group information when you move your mouse over it.If the external user matches two external-group objects, both external-group object names will be shown.
Acct. StatusFor a captive portal login, this field displays the accounting status of the account used to log into the Zyxel Device.Accounting-onmeans accounting is being performed for the user login.Accounting-offmeans accounting has stopped for this user login.A “-” displays if accounting is not enabled for this login.
RADIUS Profile NameThis field displays the name of the RADIUS profile used to authenticate the login through the captive portal.N/Adisplays for logins that do not use the captive portal and RADIUS server authentication.
Refresh Click this buttonto update the information on the screen.

6.7 Dynamic Guest

A dynamic guest account has a dynamically-created user name and password that allows a guest user to access the Internet or the Zyxel Device's services in a specified period of time. Multiple dynamic guest accounts can be automatically generated at one time for guest users by using the web configurator and the guest-manager account. Guest users can log in with the dynamic accounts when connecting to an SSID for a specified time unit. Use this screen to look at a list of dynamic guest user accounts on the Zyxel Device's local database. To access this screen, click Monitor > System Status > Dynamic Guest.

Figure 115 Monitor > System Status > Dynamic Guest
Dynamic Guest Dynamic Guest List Remove Refresh St... Userm... Crea... Rem... Time ... Expir... Quot... Rem... Band... Char... Phon... Page 0 at 0 Show 50 items No data to display

The following table describes the labels in this screen.

Table 36 Monitor > System Status > Dynamic Guest

LABEL DESCRIPTION
Dynamic Guest List
RemoveSelect an entry and click this button to remove it from the list.Note: If you delete a valid user account which is in use, the Zyxel Device ends the user session.
#This field is a sequential value and is not associated with any entry.
StatusThis field displays whether the dynamic user account is active or not.
UsernameThis field displays the user name of the dynamic user account.
Create Time This field displays when the dynamic user account was created.
Remaining TimeThis field displays the amount of Internet access time remaining for each dynamic user account.
Time PeriodThis field displays the duration of Internet access for the dynamic user account.
Expiration TimeThis field displays the date and time the Internet access becomes invalid. Once the time allocated to a dynamic account is used up or a dynamic account remains unused after the expiration time, the account is deleted from the account list.
Quota (T/U/D)This field displays how much data in both directions (Total) or upstream data (Upload) and downstream data (Download) can be transmitted through the WAN interface before the Internet access expires.
Remaining QuotaThis field displays how much more data can be transmitted through the WAN interface before the Internet access expires.
Bandwidth (U/D)This field displays the maximum upstream (Upload) and downstream (Download) bandwidth allowed for the dynamic user account in kilobits per second.
Charge This field displays access price per time unit.
Payment Info This field displays the method of payment for each account.
Real NameThis field displays the user's name of the account.
Email This field displays the email address of the account.
Phone Number This displays the user's phone number.
User Role This field displays the role of the account.

The following table describes the icons in this screen.

Table 37 Monitor > System Status > Dynamic Guest Icons

LABEL DESCRIPTION
This guest account is un-used.
This guest account is in use and online.
This guest account has been used but is offline now.
This guest account expired.
This guest account has been deleted.

6.8 IGMP Statistics

The Internet Group Management Protocol (IGMP) Statistics is used by Zyxel Device IP hosts to inform adjacent router about multicast group memberships. It can also be used for one-to-many networking applications such as online streaming video and gaming, distribution of company newsletters, updating address book of mobile computer users in the field allowing more efficient use of resources when supporting these types of applications. Click Monitor > System Status > IGMP Statistics to open the following screen.

Figure 116 Monitor > System Status > IGMP Statistics
IGMP Statistics IGMP Statistics ▲ Group Source IP Incoming Int... Packet Count Bytes Outgoing Interface Page 0 of 0 Show 50 Items No data to display Refresh

The following table describes the labels in this screen.

Table 38 Monitor > System Status > IGMP Statistics

LABEL DESCRIPTION
#This field is a sequential value, and it is not associated with a specific IGMP Statistics.
GroupThis field displays the group of devices in the IGMP.
Source IP This field displays the host source IP information of the IGMP.
Incoming InterfaceThis field displays the incoming interface that's connected on the IGMP.
Packet Count This field displays the packet size of the data being transferred.
Bytes This field displays the size of the data being transferred in Byes.
Outgoing InterfaceThis field displays the outgoing interface that's connected on the IGMP.
Refresh Click this button to update the information on the screen.

6.9 The DDNS Status Screen

The DDNS Status screen shows the status of the Zyxel Device's DDNS domain names. Click Monitor > System Status > DDNS Status to open the following screen.

Figure 117 Monitor > System Status > DDNS Status
DDNS Status DDNS Status Update Profile Name Domain Name Effective IP Last update Last Update Time Page 0 of 0 Show 50 items No data to display Refresh

The following table describes the labels in this screen.

Table 39 Monitor > System Status > DDNS Status

LABEL DESCRIPTION
UpdateClick this to have the Zyxel Device update the profile to the DDNS server. The Zyxel Device attempts to resolve the IP address for the domain name.
# This field is a sequential value, and it is not associated with a specific DDNS server.
Profile NameThis field displays the descriptive profile name for this entry.
Domain NameThis field displays each domain name the Zyxel Device can route.
Effective IP This is the (resolved) IP address of the domain name.
Last UpdateThis shows whether the last attempt to resolve the IP address for the domain name was successful or not. Updating means the Zyxel Device is currently attempting to resolve the IP address for the domain name.
Last Update TimeThis shows when the last attempt to resolve the IP address for the domain name occurred (in year-month-day hour:minute:second format).
RefreshClick this button to update the information on the screen.

6.10 IP/MAC Binding

Click Monitor > System Status > IP/MAC Binding to open the IP/MAC Binding screen. This screen lists the devices that have received an IP address from Zyxel Device interfaces with IP/MAC binding enabled and have ever established a session with the Zyxel Device. Devices that have never established a session with the Zyxel Device do not display in the list.

Figure 118 Monitor > System Status > IP/MAC Binding
IP/MAC Binding Monitor Table Interface: none IP Address Host Name MAC Address Last Access Description Page 0 of 0 Show 50 items No data to display Refresh

The following table describes the labels in this screen.

Table 40 Monitor > System Status > IP/MAC Binding

LABEL DESCRIPTION
InterfaceSelect a Zyxel Device interface that has IP/MAC binding enabled to show to which devices it has assigned an IP address.
#This field is a sequential value, and it is not associated with a specific IP/MAC binding entry.
IP Address This is the IP address that the Zyxel Device assigned to a device.
Host NameThis field displays the name used to identify this device on the network (the computer name). The Zyxel Device learns these from the DHCP client requests.
MAC AddressThis field displays the MAC address to which the IP address is currently assigned.
Last AccessThis is when the device last established a session with the Zyxel Device through this interface.
DescriptionThis field displays the description of the IP/MAC binding.
Refresh Click this buttonto update the information on the screen.

6.11 Cellular Status Screen

This screen displays your mobile broadband connection status. Click Monitor > System Status > Cellular Status to display this screen.

Figure 119 Monitor > System Status > Cellular Status
Cellular Status Cellular Device Status Refresh More Information Extension Slot Connected Device Status Service Provider Cellular System Signal Quality Page 0 of 0 Show 50 items No data to display

The following table describes the labels in this screen.

Table 41 Monitor > System Status > Cellular Status

LABEL DESCRIPTION
RefreshClick this button to update the information on the screen.
More InformationClick this to display more information on your mobile broadband, such as the signal strength, IMEA/ESN and IMSI. This is only available when the mobile broadband device attached and activated on your Zyxel Device. Refer to Section 6.11.1 on page 144.
#This field is a sequential value, and it is not associated with any interface.
Extension Slot This field displaysdays where the entry's cellular card is located.
Connected Device This field displays the model name of the cellular card.
StatusNo device - no mobile broadband device is connected to the Zyxel Device.No Service - no mobile broadband network is available in the area; you cannot connect to the Internet.Limited Service - returned by the service provider in cases where the SIM card is expired, the user failed to pay for the service and so on; you cannot connect to the Internet.Device detected - displays when you connect a mobile broadband device.Device error - a mobile broadband device is connected but there is an error.Probe device fail - the Zyxel Device's test of the mobile broadband device failed.Probe device ok - the Zyxel Device's test of the mobile broadband device succeeded.Init device fail - the Zyxel Device was not able to initialize the mobile broadband device.Init device ok - the Zyxel Device initialized the mobile broadband card.Check lock fail - the Zyxel Device's check of whether or not the mobile broadband device is locked failed.Device locked - the mobile broadband device is locked.SIM error - there is a SIM card error on the mobile broadband device.SIM locked-PUK - the PUK is locked on the mobile broadband device's SIM card.SIM locked-PIN - the PIN is locked on the mobile broadband device's SIM card.Unlock PUK fail - Your attempt to unlock a WCDMA mobile broadband device's PUK failed because you entered an incorrect PUK.Unlock PIN fail - Your attempt to unlock a WCDMA mobile broadband device's PIN failed because you entered an incorrect PIN.Unlock device fail - Your attempt to unlock a CDMA2000 mobile broadband device failed because you entered an incorrect device code.Device unlocked - You entered the correct device code and unlocked a CDMA2000 mobile broadband device.Get dev-info fail - The Zyxel Device cannot get cellular device information.Get dev-info ok - The Zyxel Device succeeded in retrieving mobile broadband device information.Searching network - The mobile broadband device is searching for a network.Get signal fail - The mobile broadband device cannot get a signal from a network.Network found - The mobile broadband device found a network.Apply config - The Zyxel Device is applying your configuration to the mobile broadband device.Inactive - The mobile broadband interface is disabled.Active - The mobile broadband interface is enabled.Incorrect device - The connected mobile broadband device is not compatible with the Zyxel Device.Correct device - The Zyxel Device detected a compatible mobile broadband device.Set band fail - Applying your band selection was not successful.Set band ok - The Zyxel Device successfully applied your band selection.Set profile fail - Applying your ISP settings was not successful.Set profile ok - The Zyxel Device successfully applied your ISP settings.PPP fail - The Zyxel Device failed to create a PPP connection for the cellular interface.Need auth-password - You need to enter the password for the mobile broadband card on the cellular edit screen.Device ready - The Zyxel Device successfully applied all of your configuration and you can use the mobile broadband connection.
Service ProviderThis displays the name of your network service provider. This shows Limited Service if the service provider has stopped service to the mobile broadband card. For example if the bill has not been paid or the account has expired.
Cellular SystemThis field displays what type of cellular network the mobile broadband connection is using. The network type varies depending on the mobile broadband card you inserted and could be UMTS, UMTS/HSDPA, GPRS or EDGE when you insert a GSM mobile broadband card, or 1xRTT, EVDO Rev.0 or EVDO Rev.A when you insert a CDMA mobile broadband card.
Signal QualityThis displays the strength of the signal. The signal strength mainly depends on the antenna output power and the distance between your Zyxel Device and the service provider's base station.

6.11.1 More Information

This screen displays more information on your mobile broadband, such as the signal strength, IMEA/ESN and IMSI that helps identify your mobile broadband device and SIM card. Click Monitor > System Status > Cellular Status > More Information to display this screen.

Note: This screen is only available when the mobile broadband device is attached to and activated on the Zyxel Device.

Figure 120 Monitor > System Status > Cellular Status > More Information
Cellular Device Status Extension Slot: USB 2 Service Provider: unknown Cellular System: unknown Signal Strength: 0 Signal Quality: Very Po Device Manufacturer: Huawei Device Model: E156G Device Firmware: 11.609.10.00.00 Device IMEI / ESN: 357133032964148 SIM Card IMSI: 466924000089642 Cancel

The following table describes the labels in this screen.

Table 42 Monitor > System Status > Cellular Status > More Information

LABEL DESCRIPTION
Extension SlotThis field displays where the entry's cellular card is located.
Service ProviderThis displays the name of your network service provider. This shows Limited Service if the service provider has stopped service to the mobile broadband card. For example if the bill has not been paid or the account has expired.
Cellular SystemThis field displays what type of cellular network the mobile broadband connection is using. The network type varies depending on the mobile broadband card you inserted and could be UMTS, UMTS/ HSDPA, GPRS or EDGE when you insert a GSM mobile broadband card, or 1xRTT, EVDO Rev.0 or EVDO Rev.A when you insert a CDMA mobile broadband card.
Signal StrengthThis is the Signal Quality measured in dBm.
Signal QualityThis displays the strength of the signal. The signal strength mainly depends on the antenna output power and the distance between your Zyxel Device and the service provider's base station.
Device ManufacturerThis shows the name of the company that produced the mobile broadband device.
Device Model This field displays the model name of the cellular card.
Device Firmware This shows the software version of the mobile broadband device.
Device IMEI/ESNIMEI (International Mobile Equipment Identity) is a 15-digit code in decimal format that identifies the mobile broadband device.ESN (Electronic Serial Number) is an 8-digit code in hexadecimal format that identifies the mobile broadband device.
SIM Card IMSIIMSI (International Mobile Subscriber Identity) is a 15-digit code that identifies the SIM card.

6.12 The UPnP Port Status Screen

Use this screen to look at the NAT port mapping rules that UPnP creates on the Zyxel Device. To access this screen, click Monitor > System Status > UPnP Port Status.

Figure 121 Monitor > System Status > UPnP Port Status
UPnP Port Status Forwarded Port Summary Remove Remote ... External Port Protocol Internal Port Internal Client Internal Client T... Description Page 0 of 0 Show 50 items No data to display Delete All Refresh

The following table describes the labels in this screen.

Table 43 Monitor > System Status > UPnP Port Status

LABEL DESCRIPTION
Remove Select an entry and click this button to remove it from the list.
#This is the index number of the UPnP-created NAT mapping rule entry.
LABEL DESCRIPTION
Remote HostThis field displays the source IP address (on the WAN) of inbound IP packets. Since this is often a wild-card, the field may be blank.When the field is blank, the Zyxel Device forwards all traffic sent to theExternal Porton the WAN interface to theInternal Clienton theInternal Port.When this field displays an external IP address, the NAT rule has the Zyxel Device forward inbound packets to theInternal Clientfrom that IP address only.
External PortThis field displays the port number that the Zyxel Device “listens” non the WAN port) for connection requests destined for the NAT rule’sInternal PortandInternal Client. The Zyxel Device forwards incoming packets (from the WAN) with this port number to theInternal Clienton theInternal Port(on the LAN). If the field displays “0”, the Zyxel Device ignores theInternal Portvalue and forwards requests on all external port numbers (that are otherwise unmapped) to theInternal Client.
Protocol This field displays the protocol of the NAT mapping rule (TCP or UDP).
Internal PortThis field displays the port number on theInternal Clientto which the Zyxel Device should forward incoming connection requests.
Internal ClientThis field displays the DNS host name or IP address of a client on the LAN. Multiple NAT clients can use a single port simultaneously if the internal client field is set to 255.255.255.255 for UDP mappings.
Internal Client TypeThis field displays the type of the client application on the LAN.
Description This fielddisplays a text explanation of the NAT mapping rule.
Delete All Click this toremove all mapping rules from the NAT table.
RefreshClick this button to update the information on the screen.

6.13 USB Storage Screen

This screen displays information about a connected USB storage device. Click Monitor > System Status > USB Storage to display this screen.

Figure 122 Monitor > System Status > USB Storage

Storage Information
Information
Device Description:N/A
Usage:N/A
File System:N/A
Speed:N/A
Status:none
Detail:none

The following table describes the labels in this screen.

Table 44 Monitor > System Status > USB Storage

LABEL DESCRIPTION
Device description This is abasic description of the type of USB device.
UsageThis field displays how much of the USB storage device's capacity is currently being used out of its total capacity and what percentage that makes.
FilesystemThis field displays what file system the USB storage device is formatted with. This field displaysUnknownif the file system of the USB storage device is not supported by the Zyxel Device, such as NTFS.
Speed This field displays the connection speed the USB storage device supports.
StatusReady- you can have the Zyxel Device use the USB storage device.ClickRemove Nowto stop the Zyxel Device from using the USB storage device so you can remove it.Unused- the connected USB storage device was manually unmounted by using the Remove Nowbutton or for some reason the Zyxel Device cannot mount it.ClickUse Itto have the Zyxel Device mount a connected USB storage device. This button is grayed out if the file system is not supported (unknown) by the Zyxel Device. none- no USB storage device is connected.
DetailThis field displays any other information the Zyxel Device retrieves from the USB storage device.Deactivated- the use of a USB storage device is disabled (turned off) on the Zyxel Device.OutofSpace- the available disk space is less than the disk space full threshold.Mounting- the Zyxel Device is mounting the USB storage device.Removing- the Zyxel Device is unmounting the USB storage device. none- the USB device is operating normally or not connected.

6.14 Ethernet Neighbor Screen

The Ethernet Neighbor screen allows you to view the Zyxel Device's neighboring devices in one place.

It uses Smart Connect, that is Link Layer Discovery Protocol (LLDP) for discovering and configuring LLDP-aware devices in the same broadcast domain as the Zyxel Device that you're logged into using the web configurator.

LLDP is a layer-2 protocol that allows a network device to advertise its identity and capabilities on the local network. It also allows the device to maintain and store information from adjacent devices which are directly connected to the network device. This helps you discover network changes and perform necessary network reconfiguration and management.

Note: Enable Smart Connect on the System > ZON screen.

See also System > ZON for more information on the Zyxel One Network (ZON) utility that uses the Zyxel Discovery Protocol (ZDP) for discovering and configuring ZDP-aware Zyxel devices on the same network as the computer on which the ZON utility is installed.

Click Monitor > System Status > Ethernet Neighbor to see the following screen

Figure 123 Monitor > System Status > Ethernet Neighbor
Ethernet Neighbor Ethernet Neighbor Local Port(Det... Model Name System Name Firmware Version Port(Descript... IP Address MAC Address Page 0 of 0 Show 50 Items No data to display Refresh

The following table describes the fields on the previous screen.

Table 45 Monitor > System Status > Ethernet Neighbor

LABEL DESCRIPTION
Local Port (Description)This field displays the port of the Zyxel Device, on which the neighboring device is discovered.For Zyxel Devices that supportPort Role, if ports 3 to 5 are grouped together and there is a connection to P5 only, the Zyxel Device will display P3 as the interface port number (even though there is no connection to that port).
Model Name This field displays the model name of the discovered device.
System Name This field displays the system name of the discovered device.
Firmware Version This field displays the firmware version of the discovered device.
Port (Description)This field displays the first internal port on the discovered device. Internal is an interface type displayed on theNetwork > Interface > Ethernet > Editscreen. For example, if P1 and P2 are WAN, P3 to P5 are LAN, and P6 is DMZ, then Zyxel Device will display P3 as the first internal interface port number.For Zyxel Devices that supportPort Role, if ports 3 to 5 are grouped together and there is a connection to P5 only, the Zyxel Device will display P3 as the first internal interface port number (even though there is no connection to that port).
IP Address This field displays the IP address of the discovered device.
MAC Address This field displays the MAC address of the discovered device.
Refresh Click this button to update the information on the screen.

6.15 FQDN Object Screen

Click Monitor > System Status > FQDN Object to open the FQDN Object screen. View FQDN-to-IP address mappings cached in this screen. An FQDN is resolved to its IP address using the DNS server configured on the Zyxel Device. If the Zyxel Device receives a DNS query for an FQDN and the Zyxel Device has an FQDN cache entry, the Zyxel Device can map the IP address in a DNS response without having to query a DNS name server. The Zyxel Device updates FQDN-to-IP address mappings when the TTL (Time To Live) setting expires.

You can configure FQDN objects in Configuration > Object > Address/ Geo IP > Address or Configuration > Object > Address/ Geo IP > Address Group.

FQDN can be used in Security Policy, Policy Route, BWM and Web Authentication profiles as source and destination criteria. FQDN with a wildcard (for example, *.zyxel.com) can be used in these profiles as destination criteria only.

Suppose you want to block certain users from going to a website with a dynamically updated IP address using DDNS. Create an FQDN object for the website in Object > Address, and then create a Security Policy in Security Policy > Policy Control > Add. Use the FQDN object to identify the website as a destination, and configure specific users to block. When a user tries to connect to the forbidden website, the Zyxel Device first checks the IP address - website mapping in response to the DNS query and then finds the FQDN object match. The Security Policy that has this FQDN object match can then block the configured users from accessing the website.

Figure 124 Monitor > System Status > FQDN Object
FQDN Object IPv4 FQDN Object Cache List FQDN Object: All Name FQDN IP Address TTL Page 0 of 0 Show 50 items No data to display IPv6 FQDN Object Cache List FQDN Object: All Name FQDN IP Address TTL Page 0 of 0 Show 50 items No data to display Refresh

The following table describes the fields on the previous screen.

Table 46 Monitor > System Status > FQDN Object

LABEL DESCRIPTION
IPv4 FQDN Object Cache ListYou must first configure IPv4 FQDN objects inConfiguration > Object > Address/ Geo IP in the IPv4 Address Configuration field.
FQDN ObjectSelect a previously created object from the drop-down list box to display related FQDN object caches used in DNS queries.
# This is the index number of the FQDN entry.
Name This field displays the name of the selected FQDN object used in DNS queries.
FQDN This field displays a host's fully qualified domain name.
IP AddressThis field displays the mapping of the FQDN to an IP address. This is the IP address of a host.
TTL This field displays the number of seconds the Zyxel Device holds IP address - FQDN object mapping in its cache. The mapping is updated when the TTL (Time To Live) setting expires.
IPv6 FQDN Object Cache ListYou must first configure IPv6 FQDN objects inConfiguration > Object > Address/ Geo IP in the IPv6 Address Configuration field.

Table 46 Monitor > System Status > FQDN Object

LABEL DESCRIPTION
FQDN ObjectSelect an object from the drop-down list box to display related IPv6 FQDN object caches used in DNS queries.
# This is the index number ofthe IPv6 FQDN entry.
Name This field displays thename of the selected IPv6 FQDN object used in DNS queries.
FQDN This field displays a host's fully qualified domain name.
IP AddressThis field displays the mapping of the FQDN to an IPv6 address. This is the IPv6 address of a host.
TTL This field displays the number of seconds the Zyxel Device holds IP address - FQDN object mapping in its cache. The mapping is updated when the TTL (Time To Live) setting expires.
Refresh Click this button toupdate the information on the screen.

6.16 Virtual Server Load Balancing

Virtual server load balancing allows you to distribute incoming connection requests to a virtual server between multiple real (physical) servers. This helps reduce each server's workload and to decrease virtual server response times.

Use this screen to view traffic statistics between a client and a real server. You can then assess if loading among real servers is balanced. If not, you may need to change the loading algorithm.

Please see Section 12.5 on page 366 for more information on virtual load balancing server.

Click Monitor > Virtual Server LB to see the following screen

Figure 125 Monitor > Virtual Server LB
Virtual Server Load Balancer Status View: Traffic/Connections By Packets Server IP Server ... Status Active Conn... Inactive Con... Incoming Pa... Outgoing Pa... Incoming Bytes Outgoing Bytes ∃ Virtual Server LB: all (192.168.100.99:80)(1 Server) 1 192.168.11.33 80 On-line 0 0 576 1491 32434 2174692 ∃ Virtual Server LB: ftp (192.168.100.99:21)(1 Server) 2 192.168.11.33 21 On-line 2 3 28 15809 1380 23767002 ∃ Virtual Server LB: no active (192.168.100.100:80)(1 Server) 3 192.168.11.33 80 Off-line n/a n/a n/a n/a n/a n/a ∃ Virtual Server LB: no_health_check (192.168.100.100:21)(1 Server) 4 192.168.11.33 21 On-line 0 0 0 0 0 0 ∃ Virtual Server LB: partial (192.168.100.99:443)(2 Servers) 5 192.168.11.33 443 On-line 0 0 0 0 0 0 6 192.168.11.34 443 Off-line n/a n/a n/a n/a n/a n/a Page 1 of 1 Show 50 Items Displaying 1 - 6 of 6

The following table describes the labels in this screen.

Table 47 Monitor > Virtual Server LB

LABEL DESCRIPTION
View Select how to view the virtual server load balancing traffic.
# This is the index number of a table entry.
Server IPThis field displays the IP address of the real server to which the virtual server load balancing traffic is coming from/going to.
Server PortThis field displays the port number on the real server that identifies the service the client requested.
StatusThis field displays the result of the health check. If the health check fails, it will display Off-line, if the health check is OK, it displays On-line.
The following fields display when you choose Traffic/Connections By Packets
Active ConnectionThis field displays the number of active connections between the real server and clients for the specified service.
Inactive ConnectionThis field displays the number of once active, but now idle connections between the real server and clients for the specified service.
Incoming PacketsThis field displays the number of packets going to the real server from clients for the specified service.
Outgoing PacketsThis field displays the number of packets coming from the real server to clients for the specified service.
Incoming BytesThis field displays the number of bytes going to the real server from clients for the specified service.
Outgoing BytesThis field displays the number of bytes coming from the real server to clients for the specified service.
The following fields display when you choose Traffic/Connections By Rates
Connections/sThis field displays the number of connections per second between the real server and clients for the specified service.
Incoming Packets/sThis field displays the number of packets per second going to the real server from clients for the specified service.
Outgoing Packets/sThis field displays the number of packets per second coming from the real server to clients for the specified service.
Incoming Bytes/sThis field displays the number of bytes per second going to the real server from clients for the specified service.
Outgoing Bytes/sThis field displays the number of bytes per second coming from the real server to clients for the specified service.
RefreshClick this button to update the information on the screen.

6.17 AP Information: AP List

The AP Information menu contains AP List, Radio List, Top N APs and Single AP screens. Click Monitor > Wireless > AP Information to display the AP List screen.

Figure 126 Monitor > Wireless > AP Information > AP List
AP List Radio List Top N APs Single AP Hide Advanced Settings Filter AP List: All Status: All Keyword: Search Reset AP List Enable Column Freeze Status Description CPU Usage IP Address MAC Address Station 24G Station 5G Recent On- Page of Show 50 Items No data to display Apply Refresh

The following table describes the labels in this screen.

Table 48 Monitor > Wireless > AP Information > AP List

LABEL DESCRIPTION
FilterClick Show Advanced Settings to reveal Filter fields where you can display managed APs by status, keyword or those managed by the Nebula portal.
AP List Select the typeof APs you want to display.Select All to show all kinds of APs that are currently or used to be connected to the Zyxel Device.Select NebulaFlexPRO to show the APs that can work in Nebula cloud management mode.
Status Select the statusof APs you want to display.You can display APs managed by the Zyxel Device according to the following:Online All: APs that are online now + APs with configuration conflict + APs with non-supported features + APs that are now updating firmwareOnline: APs that are online nowConflict: APs with configurations in conflict with the Zyxel Device (see More Details)Non Support: APs with features not supported by the Zyxel Device (see More Details)Updating: APs that are have updated firmware and rebootedOffline All: Offline + Offline for Firmware UpdateOffline: The CAPWAP server did not receive keep-alive packets from these APs in the last 2 minutes (Offline All - Offline for Firmware Update)Offline for Firmware Update: APs that were rebooted before updating firmwareUn-Mgmt: APs that are not managed by the Zyxel Device
KeywordEnter a keyword to display the APs that include it in their AP information, such as model number, firmware version, MAC address and so on. This field is case-sensitive.
Search Click this to update the list of APs based on the search criteria.Your search criteria is retained when navigating between screens.
ResetClick this to return the search criteria to the factory defaults and display all currently or previously connected APs without a filter.
Enable Column FreezeSelect this to lock the index columns in place while scrolling to the right.
Edit the selected ruleSelect an AP and click this to change the selected AP's properties, such as its group, radio, VLAN and port settings.
Add to Mgmt AP ListSelect an AP and click this to add the selected AP to the managed AP list.
Reboot deviceSelect one or multiple APs and click this button to force the AP(s) to restart.
Remove the selected rule [IMAGE]Select one or multiple APs and click this button to remove the AP(s) from the manged AP list.Note: If on theConfiguration > Wireless > Controllerscreen you set theRegistration Type to Always Accept, then as soon as you remove an AP from this list it reconnects.
DCS Now [IMAGE]Select one or multiple APs and click this button to use DCS (Dynamic Channel Selection) to allow the AP to automatically find a less-used channel in an environment where there are many APs and there may be interference.Note: You should have enabled DCS in the applied AP radio profile before the APs can use DCS.Note: DCS is not supported on the radio which is working in repeater AP mode.
More Information [IMAGE]Select an AP and click this to view a daily station count about the selected AP. The count records station activity on the AP over a consecutive 24 hour period.
Radio Information [IMAGE]Select an online AP and click this button to go to theMonitor > Wireless > AP Information > Radio Listscreen to view detailed information about the AP's radios.
Query Controller Log [IMAGE]Select one or multiple APs and click this button to go to theMonitor > Log > View Logscreen to view the selected AP's current log messages.
Nebula [IMAGE]Select an AP and click this to open a screen where you can set whether the AP's IP address and VLAN settings will be changed when it goes into Nebula cloud management mode. .Note: The AP will be set to Nebula cloud management mode and removed from the managed AP list right after you clickOK.
Upgrade Firmware Now [IMAGE]Select one or more APs and click this button to update the APs' firmware version.
Suppression On [IMAGE]Select an AP and click this button to enable the AP's LED suppression mode. All the LEDs of the AP will turn off after the AP is ready. This button is not available if the selected AP doesn't support suppression mode.
Suppression Off [IMAGE]Select an AP and click this button to disable the AP's LED suppression mode. The AP LEDs stay lit after the AP is ready. This button is not available if the selected AP doesn't support suppression mode.
Locator On [IMAGE]Select an AP and click this button to run the locator feature. The AP's Locator LED will start to blink for 10 minutes by default. It will show the actual location of the AP between several devices on the network.
# This field is a sequential value, and it is not associated with any entry.
Status This field displays the status of AP.•Online All:APs that are online now + APs with configuration conflict + APs with non-supported features + APs that are now updating firmware•Online:APs that are online now•Conflict:APs with configurations in conflict with the Zyxel Device (seeMore Details)•Non Support:APs with features not supported by the Zyxel Device (seeMore Details)•Updating:APs that are have updated firmware and rebooted•Offline All:Offline + Offline for Firmware Update•Offline:The CAPWAP server did not receive keep-alive packets from these APs in the last 2 minutes (Offline All - Offline for Firmware Update)•Offline for Firmware Update:APs that were rebooted before updating firmware•Un-Mgmt:APs that are not managed by the Zyxel Device
DescriptionThis field displays the AP's description, which you can configure by selecting the AP's entry and clicking theEditbutton.
CPU Usage This field displays the CPU Usage of the AP.
IP Address This field displays the IP address of the AP.
MAC Address This field displays the MAC address of the AP.
Station 2.4GThis field displays the number of 2.4G wireless clients connected to the AP.
Station 5G This field displays the number of 5G wireless clients connected to the AP.
Recent Online TimeThis displays the most recent time the AP came on-line.N/Adisplays if the AP has not come on-line since the Zyxel Device last started up.
Power This field displays the AP's power status.Full-the AP receives power using a power adapter and/or through a PoE switch/injector using IEEE 802.3at PoE plus. The PoE device that supports IEEE 802.3at PoE Plus can supply power of up to 30W per Ethernet port.Limited-the AP receives power through a PoE switch/injector using IEEE 802.3af PoE even when it is also connected to a power source using a power adaptor. The PoE device that supports IEEE 802.3af PoE can supply power of up to 15.4W per Ethernet port.When the AP is in limited power mode, the AP throughput decreases and has just one transmitting radio chain.It always shows Full if the AP does not support power detection.
TypeThis indicates whether the AP is on the managed AP list (Mgmt) or not (Un-Mgmt).This displaysLimitedwhen the AP is configured by conflicted or unsupported setting(s).
ModelThis field displays the AP's hardware model information. It displaysN/A(not applicable) only when the AP disconnects from the Zyxel Device and the information is unavailable as a result.
R1 Mode/ Profile/ZyMesh ProfileThis field displays the operating mode (AP, MON, rootap, or repeater), AP radio profile name and ZyMesh profile name for Radio1. It displays- for the ZyMesh profile for a radio not using a ZyMesh profile.
R2 Mode/ Profile/ZyMesh ProfileThis field displays the operating mode (AP, MON, rootap, or repeater), AP radio profile name and ZyMesh profile name for Radio2. It displays- for the ZyMesh profile for a radio not using a ZyMesh profile.
Version This field displays the AP's current firmware version.
Group This displays the name of the AP group to which the AP belongs.
Mgmt. VLAN ID (AC/AP)This displays the Access Controller (the Zyxel Device) and runtime management VLAN ID setting for the AP.VLAN Conflictdisplays if the AP's management VLAN ID does not match theMgmt.VLAN ID(AC). This field displaysn/aif the Zyxel Device cannot get VLAN information from the AP.
Last Off-line TimeThis field displays the date and time that the AP was last logged out.
LED Status This field displays the AP LED status.N/Adisplays if the AP does not support LED suppression mode and/or have a locator LED to show the actual location of the AP.A gray LED icon signifies that the AP LED suppression mode is enabled. All the LEDs of the AP will turn off after the AP is ready.A green LED icon signifies that the AP LED suppression mode is disabled and the AP LEDs stay lit after the AP is ready.A sun icon signifies that the AP's locator LED is blinking.A circle signifies that the AP's locator LED is extinguished.
Ethernet UplinkThis field displays the AP's uplink port speed and duplex mode (Full or Half).
BluetoothThis field displays the AP's Bluetooth Low Energy (BLE) capability. Bluetooth Low Energy, which is also known as Bluetooth Smart, transmits less data over a shorter distance and consumes less power than classic Bluetooth. APs communicate with other BLE enabled devices using advertisements.N/A displays if the AP does not support BLE.Unavailable displays if the AP supports Bluetooth, but there is no BLE USB dongle connected to the USB port of the AP. Some APs, such as the WAC5302D-S, need to have a supported BLE USB dongle attached to act as a beacon to broadcast packets.Available displays if the AP supports Bluetooth, detects a BLE device and advertising is inactive.Advertising displays if the AP supports Bluetooth, detects a BLE device and advertising is activated, which means the BLE device can broadcasts packets to every device around it.
Location This field displays the AP's location you configured.
Roaming GroupThis field displays the name of roaming group to which the AP belongs.
Load Balancing GroupThis field displays the AP's load balance status when load balancing is enabled on the Zyxel Device. Otherwise, it shows nothing when load balancing is disabled or the radio is in monitor mode.
S/N This field displays the serial number of the AP.
System Name This fielddisplays the system name to identify the AP on a network.
ApplyClickApplyto save your changes back to the Zyxel Device.
RefreshClickRefreshto update the AP list.

The following table describes the icons in this screen.

Table 49 Monitor > Wireless > AP Information > AP List Icons

LABEL DESCRIPTION
[3C1K]This AP is not on the management list.
[8-06]This AP is on the management list and online.
[2-4TT]This AP is in the process of having its firmware updated.
[7-7C]This AP is on the management list but offline.
[026W]This indicates one of the following cases:This AP has a runtime management VLAN ID setting that conflicts with the VLAN ID setting on the Access Controller (the Zyxel Device).A setting the Zyxel Device assigns to this AP does not match the AP's capability.

6.17.1 AP List: More Information

Use this screen to look at station statistics for the connected AP. To access this screen, select an entry and click the More Information button on the AP List screen. Use this screen to look at configuration

information, port status and station statistics for the connected AP. To access this screen, select an entry and click the More Information button on the AP List screen.

Figure 127 Monitor > Wireless > AP Information > AP List > More Information
AP Information Configuration Status: Config Setting OK Non Support: n/a Port Status Port Status PVID Up Time PORT1 1000M/Full n/a 15:36:44 Page 1 of 1 Show 50 Items Displaying 1 - 1 of 1 VLAN Configuration Name Status VID Member Page 0 of 0 Show 50 Items No data to display Ethernet Neighbor Local Po... Model N... System ... Firmwar... PortiDes... IP Address MAC Ad... Page 0 of 0 Show 50 Items No data to display Station Count 100 Stations Last Update: 2018-01-09 01:20:29 Note: The diagram is updated in 5-10 minutes periodically, it may not up to date. OK Cancel

The following table describes the labels in this screen.

Table 50 Monitor > Wireless > AP Information > AP List > More Information

LABEL DESCRIPTION
Configuration StatusThis displays whether or not any of the AP's configuration is in conflict with the Zyxel Device's settings for the AP.
ConflictIf any of the AP's configuration conflicts with the ZyWALL's settings for the AP, this field displays which configuration conflicts. It displays n/a if none of the AP's configuration conflicts with the ZyWALL's settings for the AP.
Non SupportIf any of the AP's configuration conflicts with the Zyxel Device's settings for the AP, this field displays which configuration conflicts. It displays n/a if none of the AP's configuration conflicts with the Zyxel Device's settings for the AP.
LABELDESCRIPTION
Port Status
PortThis shows the name of the physical Ethernet port on the Zyxel Device.
Status This field displays the current status of each physical port on the AP. Down - The port is not connected. Speed / Duplex - The port is connected. This field displays the port speed and duplex setting (Full or Half).
PVID This shows the port's PVID. A PVID (Port VLAN ID) is a tag that adds to incoming untagged frames received on a port so that the frames are forwarded to the VLAN group that the tag defines.
Up Time This field displays how long the physical port has been connected.
Tx BcastThis field displays the number of broadcast packets transmitted on the port.
Rx Bcast This field displays the number of broadcast packets received on the port.
VLAN Configuration
Name This shows the name of the VLAN.
Status This displays whether or not the VLAN is activated.
VID This shows the VLAN ID number.
Member This field displays the Ethernet port(s) that is a member of this VLAN.
Ethernet Neighbor
Local Port (Description)This field displays the port of the Zyxel Device, on which the neighboring device is discovered. For Zyxel Devices that support Port Role, if ports 3 to 5 are grouped together and there is a connection to P5 only, the Zyxel Device will display P3 as the interface port number (even though there is no connection to that port).
Model Name This field displays the model name of the discovered device.
System Name This field displays the system name of the discovered device.
Firmware VersionThis field displays the firmware version of the discovered device.
Port (Description)This field displays the first internal port on the discovered device. Internal is an interface type displayed on the Network > Interface > Ethernet > Edit screen. For example, if P1 and P2 are WAN, P3 to P5 are LAN, and P6 is DMZ, then Zyxel Device will display P3 as the first internal interface port number. For Zyxel Devices that support Port Role, if ports 3 to 5 are grouped together and there is a connection to P5 only, the Zyxel Device will display P3 as the first internal interface port number (even though there is no connection to that port).
IP Address This field displays the IP address of the discovered device.
MAC Address This field displays the MAC address of the discovered device.
Station Count
The y-axis represents the number of connected stations.
The x-axis shows the time over which a station was connected.
Last UpdateThis field displays the date and time the information in the window was last updated.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving your changes.

6.17.2 AP List: Edit AP

Select an AP and click the Edit Selected Rule button in the Monitor > Wireless > AP Information > AP List table to display this screen.

Figure 128 Monitor > Wireless > AP Information > AP List > Edit AP
Edit AP List Create New Object▼ Configuration MAC: SC/CF/AP/B732CF Model: WAX510D S/N: $192L43295011 Description: AP-BCO/AF/B732CF Group settings:.default System Name: (Optional) Location: (Optional) Roaming Group: (Optional) ① Load Balancing Group1 : (Optional) Load Balancing Group2 : (Optional) Radio 1 Setting Override Group Radio Setting OP Mode AP Mode MON Mode Roof AP Rereacher AP Radio 1 AP Profile: Default Override Group Output Power Setting Output Power: 30 dlim (0-30) ① Override Group SSD Setting Radio 2 Setting Override Group Radio Setting OP Mode AP Mode MON Mode Roof AP Rereacher AP Radio 2 AP Profile: Default Override Group Output Power Setting Output Power: 30 dlim (0-30) ① Override Group SSD Setting Radio 2 Setting Override Group Radio Setting OP Mode AP Mode MON Mode Roof AP Rereacher AP Radio 2 AP Profile: Default Override Group Output Power Setting Output Power: 30 dlim (0-30) ① Override Group SSD Setting IP Setting Force Overwrite IP Setting Get Automatically Use Fixed IP Address Address: Screen Mask Options DR Server IP Address: (VLAN Settings) Override Group VLAN Setting Force Overwrite VLAN Config Management VLAN ID: (1-4GHz) As Native VLAN ① Storm Control Setting Broadcast Storm Control Multicast Storm Control Rogue AP Detection Setting Override Group Rogue AP Detection Setting ①

Each field is described in the following table.

Table 51 Monitor > Wireless > AP Information > AP List > Edit AP

LABEL DESCRIPTION
Create new ObjectUse this menu to create a new Radio Profile object to associate with this AP.
MAC This displays theMAC address of the selected AP.
ModelThis field displays the AP's hardware model information. It displays N/A (not applicable) only when the AP disconnects from the Zyxel Device and the information is unavailable as a result.
DescriptionEnter a description for this AP. You can use up to 31 characters, spaces and underscores allowed.
Group Setting Select on AP group to which you want this AP to belong.
System NameEnter a name to identify the AP on a network. This is usually the AP's fully qualified domain name.
Location Specify the name of the place where the AP is located.
Roaming GroupSpecify the name of the roaming group to which the AP belongs. You can use up to 31 alphanumeric and @# characters. Dashes and underscores are also allowed. The name should start with a letter or digit.The 802.11k neighbor list a client requests from the AP is generated according to the roaming group and RCPI (Received Channel Power Indicator) value of its neighbor APs.When a client wants to roam from the current AP to another, other APs in the same roaming group or not in a roaming group will be candidates for roaming. Neighbor APs in a different roaming group will be excluded from the 802.11k neighbor lists even when the neighbor AP has the best signal strength.If the AP's roaming group is not configured, any neighbor APs can be candidates for roaming.
Load Balancing Group 1/2Load balancing is only applied to APs within the same group. If a load balancing group is not assigned to an AP, it will belong to a default group.Each AP can belong to up to two groups.
Radio 1/2 Setting
Override Group Radio SettingSelect this option to overwrite the AP radio settings with the settings you configure here.
Radio 1/2 OP Mode Select the operating mode for radio 1 or radio 2.AP Mode means the AP can receive connections from wireless clients and pass their data traffic through to the Zyxel Device to be managed (or subsequently passed on to an upstream gateway for managing).MON Mode means the AP monitors the broadcast area for other APs, then passes their information on to the Zyxel Device where it can be determined if those APs are friendly or rogue. If an AP is set to this mode it cannot receive connections from wireless clients.
Radio 1/2 ProfileSelect a profile from the list. If no profile exists, you can create a new one through the Create new Object menu.
Override Group Output Power SettingSelect this option to overwrite the AP output power setting with the setting you configure here.
Output Power Set the output power of the AP.
Override Group SSID SettingSelect this option to overwrite the AP SSID profile setting with the setting you configure here.This section allows you to associate an SSID profile with the radio.
EditSelect an SSID and click this button to reassign it. The selected SSID becomes editable immediately upon clicking.
#This is the index number of the SSID profile. You can associate up to eight SSID profiles with an AP radio.
SSID Profile Indicates which SSID profile is associated with this radio profile.
IP Setting
Force Overwrite IP SettingSelect this to change the AP's IP address setting to match the configuration in this screen.
Get AutomaticallySelect this to have the AP act as a DHCP client and automatically get the IP address, subnet mask, and gateway address from a DHCP server.
Used Fixed IP AddressSelect this if you want to specify the IP address, subnet mask, gateway and DNS server address manually.
IP Address Enter the IPaddress for the AP.
Subnet MaskEnter the subnet mask of the AP in dot decimal notation. The subnet mask indicates what part of the IP address is the same for all devices in the network.
GatewayEnter the IP address of the gateway. The AP sends packets to the gateway when it does not know how to route the packet to its destination. The gateway should be on the same network as the AP.
DNS Server IP AddressEnter the IP address of the DNS server.
VLAN Settings
Override Group VLAN SettingSelect this option to overwrite the AP VLAN setting with the setting you configure here.
Force Overwrite VLAN ConfigSelect this to have the Zyxel Device change the AP's management VLAN to match the configuration in this screen.
Management VLAN IDEnter a VLAN ID for this AP.
As Native VLANSelect this option to treat this VLAN ID as a VLAN created on the Zyxel Device and not one assigned to it from outside the network.
Storm Control SettingTraffic storm control limits the number of broadcast and/or multicast packets the Zyxel Device receives on the ports. When the maximum number of allowable broadcast and/or multicast packets is reached, the subsequent packets are discarded.Select Broadcast Storm Control to enable broadcast storm control on the Zyxel Device. Enabling this will drop ingress broadcast traffic in the physical Ethernet port if it exceeds the maximum traffic rate.Select Multicast Storm Control to enable multicast storm control on the Zyxel Device. Enabling this will drop ingress multicast traffic in the physical Ethernet port if it exceeds the maximum traffic rate.
Rogue AP Detection SettingThis feature allows the Zyxel Device to monitor the WiFi signals for other wireless APs. A rogue AP is a wireless access point operating in a network's coverage area that is not under the control of the network administrator, and which can potentially open up holes in a network's security.Select this check box to detect Rogue APs in the network.
Antenna SettingSelect Wall if you mount the Zyxel Device to a wall. Select Ceiling if the Zyxel Device is mounted on a ceiling. You can switch from Wall to Ceiling if there are still wireless dead zones, and vice versa.
LED Suppression Mode ConfigurationIf the Suppression On check box is checked, the LEDs of yourZyxel Device will turn off after it's ready.If the check box is unchecked, the LEDs will stay lit after theZyxel Device is ready.
Power SettingSelect this check box if you are using a PoE injector that does not support PoE negotiation. Otherwise, the Zyxel Device cannot draw full power from the power sourcing equipment. Enable this power mode to improve the Zyxel Device's performance in this situation.Note: Ensure that the power sourcing equipment can supply enough power to the AP to avoid abnormal system reboots.Note: Only enable this if you are using a passive PoE injector that is not IEEE 802.3at/bt compliant but can still provide full power.
Locator LED ConfigurationClickTurn Onbutton to activate the locator. The Locator function will show the actual location of the Zyxel Device between several devices in the network.Otherwise, clickTurn Offto disable the locator feature.
Automatically Extinguish AfterEnter a time interval between 1 and 60 minutes to stop the locator LED from blinking. Default is 10 minutes.
Reset AP ConfigurationClickApply Factory Defaultto reset all of the AP settings to the factory defaults.
OKClickOKto save your changes back to the Zyxel Device.
CancelClickCancelto close the window with changes unsaved.

6.18 AP Information: Radio List

Click Monitor > Wireless > AP Information > Radio List to display the Radio List screen.

Figure 129 Monitor > Wireless > AP Information > Radio List
AP List Radio List Top N APs Single AP Radio List More Information # Loading AP ... Freq... Cha... Tx P... Staff... Rx Tx Model MA... Radio OP ... AP /... Ant... Page 0 of 0 Show 50 items No data to display Refresh

The following table describes the labels in this screen.

Table 52 Monitor > Wireless > AP Information > Radio List

LABEL DESCRIPTION
More InformationClick this icon to see the traffic statistics, station count, SSID, Security Mode and VLAN ID information on the AP.
Enable Column FreezeSelect this to lock the index columns in place while scrolling to the right.
# This field is a sequential value, and it is not associated with a specific radio.

Table 52 Monitor > Wireless > AP Information > Radio List

LABELDESCRIPTION
LoadingThis indicates the AP's load balance status (UnderLoad or OverLoad) when load balancing is enabled on the AP. Otherwise, it shows - when load balancing is disabled or the radio is in monitor mode.
AP DescriptionEnter a description for this AP. You can use up to 31 characters, spaces and underscores allowed.
Frequency BandThis field displays the WLAN frequency band using the IEEE 802.11 a/b/g/n standard of 2.4 or 5 GHz.
Channel ID This field displays the WLAN channels using the IEEE 802.11 protocols.
Tx Power This shows the radio's output power (in dBm).
Station This field displays the station count information.
Rx This field displays the total number of bytes received by the radio.
Tx This field displays the total number of bytes transmitted by the radio.
ModelThis field displays the AP's hardware model information. It displays N/A (not applicable) only when the AP disconnects from the Zyxel Device and the information is unavailable as a result.
MAC Address This field displays the MAC address of the AP.
Radio This field displays the Radio number. For example 1.
OP ModeThis field displays the operating mode of the AP. It displays n/a for the profile for a radio not using an AP profile.AP Mode means the AP can receive connections from wireless clients and pass their data traffic through to the Zyxel Device to be managed (or subsequently passed on to an upstream gateway for managing).
AP / ZyMesh ProfileThis indicates the AP radio and ZyMesh profile names to which the radio belongs.
AntennaThis indicates the antenna orientation for the radio (Wall or Ceiling).This shows N/A if the AP does not allow you to adjust coverage depending on the orientation of the antenna for each radio using the web configurator or a physical switch.

6.18.1 Radio List: More Information

This screen allows you to view detailed information about a selected radio's SSID(s), wireless traffic and wireless clients for the preceding 24 hours. To access this window, select an entry and click the More Information button on the Radio List screen.

Figure 130 Monitor > Wireless > AP Information > Radio List > More Information
ZYXEL USGFLEX700-GB0101F - Radio List: More Information - 1

The following table describes the labels in this screen.

Table 53 Monitor > Wireless > AP Information > Radio List > More Information

LABEL DESCRIPTION
MBSSID DetailThis list shows information about the SSID(s) that is associated with the radio over the preceding 24 hours.
#This is the items sequential number in the list. It has no bearing on the actual data in this list.
SSID NameThis displays an SSID associated with this radio. There can be up to eight maximum.
BSSIDThis displays the MAC address associated with the SSID.
Security ModeThis displays the security mode in which the SSID is operating.
Forwarding ModeThis field indicates the forwarding mode (Local Bridge or Tunnel) associated with the SSID profile.
VLAN This displays the VLAN ID associated with the SSID.
Traffic StatisticsThis graph displays the overall traffic information about the radio over the preceding 24 hours.
y-axisThis axis represents the amount of data moved across this radio in megabytes per second.
x-axisThis axis represents the amount of time over which the data moved across this radio.
Station CountThis graph displays information about all the wireless clients that have connected to the radio over the preceding 24 hours.
y-axis The y-axis represents the number of connected wireless clients.
x-axis The x-axis shows the time over which a wireless client was connected.
Last UpdateThis field displays the date and time the information in the window was last updated.
OK Click this to close this window.
Cancel Click this to close this window.

Click Monitor > Wireless > AP Information > Built-in AP to display this screen. The following table describes the labels in this screen.

Table 54 Monitor > Wireless > AP Information > Built-in AP

LABEL DESCRIPTION
Single Station Status
Usage by Select the measureunit in GB or MB to display the graph.
Traffic UsageThis graph displays traffic usage from associated wireless stations in the preceding 24 hours.
y-axisThe y-axis represents the amount of traffic in megabytes/gigabytes.
x-axisThe x-axis represents the time over which wireless traffic flows transmitting from/to the AP.
Station CountThis graph displays the number of wireless stations that have connected to the AP in the preceding 24 hours.
y-axisThe y-axis represents the number of connected wireless stations.
x-axisThe x-axis represents the time over which a wireless client was connected.
RefreshClick Refresh to update this screen.

6.19 AP Information: Top N APs

Use this screen to view the top five or top ten wireless traffic usage and associated wireless stations for the preceding 24 hours. Click Monitor > Wireless > AP Information > Top N APs to display the Top N APs screen.

Figure 131 Monitor > Wireless > AP Information > Top N APs
AP List Radio List Top N APs Single AP TOP N Stations Status View: Top 5 by Usage Usage by: MB all 2.4G 5G Traffic Usage MB Total_Usage Station Count Count Total_Count Refresh

The following table describes the labels in this screen.

Table 55 Monitor > Wireless > AP Information > Top N APs

LABEL DESCRIPTION
ViewSelect this to view the top five or top ten wireless traffic usage and associated wireless stations for the preceding 24 hours.
Usage byIf you view the data usage by Usage, select the frequency band and the measure unit in GB or MB to display the graph.If you view the date usage by Station Number, select the measure unit in GB or MB to display the graph.
Traffic UsageThis graph displays the overall traffic information about the top five or top ten wireless traffic for the preceding 24 hours.
y-axisThe y-axis represents the amount of traffic in megabytes/gigabytes.
x-axisThe x-axis represents the time over which wireless traffic flows transmitting from/to the AP.
Station CountThis graph displays information about all the wireless stations that have connected to the AP for the preceding 24 hours.
y-axisThe y-axis represents the number of connected wireless stations.

Table 55 Monitor > Wireless > AP Information > Top N APs

LABEL DESCRIPTION
x-axis The x-axis representsthe time over which a wireless client was connected.
RefreshClick Refresh to update this screen.

6.20 AP Information: Single AP

Use this screen to view wireless traffic usage and wireless stations for a managed AP. Click Monitor > Wireless > AP Information > Single AP to display the Single AP screen.

Figure 132 Monitor > Wireless > AP Information > Single AP
AP List Radio List Top N APs Single AP Single Station Status AP Selection: Usage by: MB Traffic Usage 1.1 1.0 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0.0 MB Station Count Count 0.0 1.1 1.0 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0.0 Refresh

The following table describes the labels in this screen.

Table 56 Monitor > Wireless > AP Information > Single AP

LABEL DESCRIPTION
AP SelectionSelect a managed AP from the drop-down list box to view its wireless traffic usage and wireless stations.
Usage by Select the measureunit in GB or MB to display the graph.
Traffic UsageThis graph displays the overall traffic information about the AP you specified for the preceding 24 hours.
y-axisThe y-axis represents the amount of traffic in megabytes/gigabytes.
x-axisThe x-axis represents the time over which wireless traffic flows transmitting from/to the AP.

Table 56 Monitor > Wireless > AP Information > Single AP

LABEL DESCRIPTION
Station CountThis graph displays information about all the wireless stations that have connected to the AP for the preceding 24 hours.
y-axisThe y-axis represents the number of connected wireless stations.
x-axis The x-axis representsthe time over which a wireless client was connected.
RefreshClick Refresh to update this screen.

6.21 ZyMesh

Use this screen to view the ZyMesh traffic statistics between the managed APs. Click Monitor > Wireless > ZyMesh to display this screen.

Figure 133 Monitor > Wireless > ZyMesh
ZyMesh Link Info ZyMesh Link Info Descri... IP Add... Ch... Hop Uplink ... SSID N... Signal Str... Link U... MAC ... Tx ... Root AP Tx ... Rx ... Page 0 of 0 Show 50 Items No data to display Refresh

The following table describes the labels in this screen.

Table 57 Monitor > Wireless > ZyMesh

LABEL DESCRIPTION
#This field displays the index number of the managed AP (in repeater mode) in this list.
DescriptionThis field displays the descriptive name of the managed AP (in repeater mode).
IP AddressThis field displays the IP address of the managed AP (in repeater mode).
Channel IDThis field displays the number of the channel used by the managed AP (in repeater mode).
HopThis is the hop count of the managed AP. For example, “1” means the managed AP is connected to a root AP directly. “2” means there is another repeater AP between the managed AP and the root AP.
Uplink AP InfoThis shows the role and descriptive name of the managed AP to which this managed AP is connected wirelessly.
SSID NameThis indicates the name of the wireless network (SSID) the managed AP uses to associated with another managed AP.
Signal StrengthBefore the slash, this shows the signal strength the uplink AP (a root AP or a repeater) receives from this managed AP (in repeater mode).After the slash, this shows the signal strength this managed AP (in repeater mode) receives from the uplink AP.
Link Up TimeThis field displays the time the managed AP first associated with the root AP or repeater.
MAC AddressThis field displays the MAC address of the managed AP (in repeater mode).

Table 57 Monitor > Wireless > ZyMesh

LABEL DESCRIPTION
Tx Power This field displays theoutput power of the managed AP (in repeater mode).
Root APThis field displays the descriptive name of the root AP to which the managed AP is connected wirelessly.
Tx RateThis field displays the maximum transmission rate of the root AP or repeater to which the managed AP is connected.
Rx RateThis field displays the maximum reception rate of the root AP or repeater to which the managed AP is connected.
RefreshClick Refresh to update this screen.

6.22 SSID Info

Use this screen to view the number of wireless clients currently connected to an SSID and the security type used by the SSID. Click Monitor > Wireless > SSID Info to display this screen.

Figure 134 Monitor > Wireless > SSID Info
SSID Info Station information for each SSID SSID ▲ 2.4GHz 5GHz SSID Profile Name Security Mode 1 ZyXEL 0 0 default none Page 1 of 1 Show 50 items Displaying 1 - 1 of 1 Refresh

The following table describes the labels in this screen.

Table 58 Monitor > Wireless > SSID Info

LABEL DESCRIPTION
# This is the SSID's index number in this list.
SSIDThis indicates the name of the wireless network to which the client is connected. A single AP can have multiple SSIDs or networks.
2.4GHzThis shows the number of wireless clients which are currently connected to the SSID using the 2.4 GHz frequency band. Click the number to go to the Station Info > Station List screen. See Section 6.24 on page 170.
5GHzThis shows the number of wireless clients which are currently connected to the SSID using the 5 GHz frequency band. Click the number to go to the Station Info > Station List screen. See Section 6.24 on page 170.
SSID Profile NameThis indicates the name of the SSID profile in which the SSID is defined,
Security ModeThis indicates which secure encryption methods is being used by the SSID.
RefreshClick Refresh to update this screen.

6.23 Station Info: Station List

The Station Info menu contains Station List, Top N Stations and Single Station screens. This screen displays information about connected wireless stations. Click Monitor > Wireless > Station Info > Station List to display this screen.

Figure 135 Monitor > Wireless > Station Info > Station List
Station List Top N Stations Single Station Station List MAC Ad... Assoc... S$ID Name Secur... Signal Str... Ch... B... IP Ad... Tx ... Rx... Tx Rx Associati... Page 0 of 0 Show 50 items No data to display Refresh

The following table describes the labels in this screen.

Table 59 Monitor > Wireless > Station Info > Station List

LABEL DESCRIPTION
Hide/Show Advanced SettingsClick this button to display a greater or lesser number of configuration fields.
Show Filter/ Hide Filer Click thisbutton to show or hide the filter settings.
Filter
IP AddressEnter the IP address of the station you want to display. This field is case-sensitive.
Associated AP Select the AP(s) with which the stations you want to display associate.
SSID NameSelect the SSID(s) to which the stations you want to display are connected.
MAC AddressEnter the MAC address of the station you want to display. This field is case-sensitive.
Security ModeSelect the security mode(s) used by the stations you want to display.
AccountEnter the user account name of the station you want to display. This field is case-sensitive.
Login TypeSelect the login method(s) used by the stations you want to display.
Band Select the frequency band used by the stations you want to display.
Search Click this to update the list of stations based on the search criteria.Your search criteria is retained when navigating between screens.
Reset Click this to return the search criteria to the factory defaults and display all connected stations without a filter.
Enable Column FreezeSelect this to lock the index columns in place while scrolling to the right.
Station List
#This field is a sequential value, and it is not associated with a specific station.
MAC AddressThis field displays the MAC address of the station.
SSID NameThis field displays the SSID names of the station.
Associated APThis field displays the APs that are associated with the station.
IP Address This field displays the IP address of the station.
ChannelThis field displays the number of the channel used by the station to connect to the network.

Table 59 Monitor > Wireless > Station Info > Station List

LABEL DESCRIPTION
Rx Rate This field displays thereceive data rate of the station.
Tx Rate This field displays thetransmit data rate of the station.
Signal StrengthThis field displays the signal strength of the station.
Association TimeThis field displays the time duration the station was online and offline.
Enterprise This field displays theRADIUS server of the station.
Captive PortalThis displays whether the station logged into the network via the captive portal login page.
MAC AuthThis displays whether the station logged into the network via MAC authentication.
Band This field displays the frequency band which is currently being used by the station.
CapabilityThis displays the supported standard currently being used by the station or the standards supported by the station.
802.11 FeaturesThis displays whether the station supports IEEE802.11r, IEEE 802.11k, IEEE 802.11v or none of the above (N/A).
Security Mode This field displays the security mode the station is using.
Download This field displays the number of bytes received by the station.
Upload This field displays the number of bytes transmitted from the station.
RefreshClick Refresh to update this screen.

6.24 Station Info: Top N Stations

Use this screen to view the top five or top ten traffic statistics of the wireless stations. Click Monitor > Wireless > Station Info > Top N Stations to display this screen.

Figure 136 Monitor > Wireless > Station Info > Top N Stations
Station List Top N Stations Single Station TOP N Stations Status View: Top 5 by Usage Usage by: MB Traffic Usage 1.1 1.0 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0.0 Total_Usage Refresh

The following table describes the labels in this screen.

Table 60 Monitor > Wireless > Station Info > Top N Stations

LABEL DESCRIPTION
ViewSelect this to view the top five or top ten traffic statistics of the wireless stations.
Usage by Select the measureunit in GB or MB to display the graph.
Traffic UsageThis graph displays the overall traffic information about the stations for the preceding 24 hours.
y-axisThis axis represents the amount of data moved across stations in megabytes per second.
RefreshClick Refresh to update this screen.

6.25 Station Info: Single Station

Use this screen to view traffic statistics of the wireless station you specified. Click Monitor > Wireless > Station Info > Single Station to display this screen.

Figure 137 Monitor > Wireless > Station Info > Single Station
Station List Top N Stations Single Station Single Station Status Station Selection: Usage by: MB Traffic Usage 1.1 1.0 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0.0 MB no station Refresh

The following table describes the labels in this screen.

Table 61 Monitor > Wireless > Station Info > Single Station

LABEL DESCRIPTION
Station SelectionSelect this to view the traffic statistics of the wireless station.
Usage by Select the measureunit in GB or MB to display the graph.
Traffic UsageThis graph displays the overall traffic information about the station over the preceding 24 hours.
y-axisThis axis represents the amount of data moved across this station in megabytes per second.
RefreshClick Refresh to update this screen.

6.26 Detected Device

Use this screen to view information about wireless devices detected by the AP. Click Monitor > Wireless > Detected Device to access this screen.

Note: At least one radio of the APs connected to the Zyxel Device must be set to monitor mode (on the Configuration > Wireless > AP Management screen) in order to detect other wireless devices in its vicinity.

Figure 138 Monitor > Wireless > Detected Device
Detected Device Detected Device Mark as Rogue AP Mark as Friendly AP Stat... Dev... Role MAC Address SSD Name Channel... 802... Sec... Descrip... Last Seen Page 0 of 0 Show 50 items No data to display Refresh

The following table describes the labels in this screen.

Table 62 Monitor > Wireless > Detected Device

LABEL DESCRIPTION
Discovered APs
Rogue AP This shows how many devices are detected as rogue APs.
Suspected rogue APThis shows how many devices are detected as possible rogue APs.
Friendly AP This shows how many devices are detected as friendly APs.
Un-Classified APThis shows how many devices are detected, but have not been classified as either Rogue or Friendly by the Zyxel Device.
Detect nowClick this button for the Zyxel Device to scan for APs in the network.
Mark as Rogue APClick this button to mark the selected AP as a rogue AP. A rogue AP can be contained on theConfiguration > Wireless > MON Mode screen.
Mark as Friendly APClick this button to mark the selected AP as a friendly AP. For more on managing friendly APs, see theConfiguration > Wireless > MON Mode screen.
# This is the station's index number in this list.
RoleThis indicates the detected device's role (such as friendly or rogue).
Classified byThis indicates the detected device's classification rule.
MAC AddressThis indicates the detected device's MAC address.
SSID Name This indicates the detected device's SSID.
Channel IDThis indicates the detected device's channel ID.
802.11 Mode This indicates the 802.11 mode (a/b/g/n) transmitted by the detected device.
Security This indicates the encryption method (if any) used by the detected device.
Seen by This indicates which AP detects the device.If an AP in monitor mode detected this AP, this column will show “N/A”.If an AP using Rogue AP Detection detected this device, it will show the name of the AP and the signal strength from the detected device. If the wireless device is detected by more than one AP, only the top 5 APs with the highest signal strength will be shown.
Group This indicates which group the detected device belongs.
DescriptionThis displays the detected device's description. For more on managing friendly and rogue APs, see the Configuration > Wireless > MON Mode screen.
Last SeenThis indicates the last time the device was detected by the Zyxel Device.
Refresh Click this to refresh the items displayed on this page.

6.27 The Printer Status Screen

This screen displays information about the connected statement printer. Click Monitor > Printer Status to display this screen.

Figure 139 Monitor > Printer Status
Printer Status Printer List IPv4 Address Update Time Status Description Nickname Firmware Ve... MAC Page 0 of 0 Show 50 items No data to display

The following table describes the labels in this screen.

Table 63 Monitor > Printer Status

LABEL DESCRIPTION
# This is the index number of the printer in the list.
IPv4 AddressThis field displays the IP address of the printer that you configured in the screen.
Update TimeThis field displays the date and time the Zyxel Device last synchronized with the printer.This shows n/a when the printer status is sync fail.
StatusThis field displays whether the Zyxel Device can connect to the printer and update the printer information.
DescriptionThis field displays the descriptive name of the printer that you configured in the screen.
NicknameThis field displays the nickname of the printer that you configured in the Edit screen.
Firmware VersionThis field displays the model number and firmware version of the printer.This shows n/a when the printer status is sync fail.
MAC This field displays the MAC address of the printer.

6.28 The IPSec Screen

You can use the IPSec Monitor screen to display and to manage active IPSec SAs. To access this screen, click Monitor >VPN Monitor >IPSec. The following screen appears. Click a column's heading cell to sort the table entries by that column's criteria. Click the heading cell again to reverse the sort order.

Figure 140 Monitor > VPN Monitor > IPSec
IPSec Current IPSec Security Associations Name: Policy: Search Disconnect Connection Check SerialN... System ... Name ▲ Policy My Ad... Secure ... Up Time Timeout Inboun... Outbo... Page 0 of 0 Show 50 items No data to display Refresh

Each field is described in the following table.

Table 64 Monitor > VPN Monitor > IPSec

LABEL DESCRIPTION
NameType the name of a IPSec SA here and click Search to find it (if it is associated). You can use a keyword or regular expression. Use up to 30 alphanumeric and _+-.()!^:? | []<>/ characters. See Section on page 175 for more details.
PolicyType the IP address(es) or names of the local and remote policies for an IPSec SA and click Search to find it. You can use a keyword or regular expression. Use up to 30 alphanumeric and _+-.()!^:? | {}[]<>/ characters. See Section on page 175 for more details.
Search Click this button to search for an IPSec SA that matches the information you specified above.
DisconnectSelect an IPSec SA and click this button to disconnect it.
Connection Check Select an IPSec SA and click this button to check the connection.
# This field is a sequential value, and it is not associated with a specific SA.
Serial Number This field displays the serial number of this Zyxel Device.
System Name This field displays the name used to identify the Zyxel Device.
Name This field displays the name of the IPSec SA.
PolicyThis field displays the content of the local and remote policies for this IPSec SA. The IP addresses, not the address objects, are displayed.
My Address This field displays the IP address of local computer.
Secure Gateway This field displays the secure gateway information.
Up TimeThis field displays how many seconds the IPSec SA has been active. This field displays N/A if the IPSec SA uses manual keys.
TimeoutThis field displays how many seconds remain in the SA life time, before the Zyxel Device automatically disconnects the IPSec SA. This field displays N/A if the IPSec SA uses manual keys.
Inbound (Bytes)This field displays the amount of traffic that has gone through the IPSec SA from the remote IPSec router to the Zyxel Device since the IPSec SA was established.
Outbound (Bytes)This field displays the amount of traffic that has gone through the IPSec SA from the Zyxel Device to the remote IPSec router since the IPSec SA was established.

Regular Expressions in Searching IPSec SAs

A question mark (?) lets a single character in the VPN connection or policy name vary. For example, use "a?c" (without the quotation marks) to specify abc, acc and so on.

Wildcards (*) let multiple VPN connection or policy names match the pattern. For example, use "*abc" (without the quotation marks) to specify any VPN connection or policy name that ends with "abc". A VPN connection named "testabc" would match. There could be any number (of any type) of characters in front of the "abc" at the end and the VPN connection or policy name would still match. A VPN connection or policy name named "testacc" for example would not match.

A * in the middle of a VPN connection or policy name has the Zyxel Device check the beginning and end and ignore the middle. For example, with "abc*123", any VPN connection or policy name starting with "abc" and ending in "123" matches, no matter how many characters are in between.

The whole VPN connection or policy name has to match if you do not use a question mark or asterisk.

6.29 The SSL Screen

The Zyxel Device keeps track of the users who are currently logged into the VPN SSL client. Click Monitor >VPN Monitor >SSL to display the user list.

Use this screen to do the following:

• View a list of active SSL VPN connections.
- Log out individual users and delete related session information.

Once a user logs out, the corresponding entry is removed from the screen.

Figure 141 Monitor > VPN Monitor > SSL
SSL Current SSL VPN Connection Disconnect Refresh User Access Login Address Connected Ti... Inbound(Bytes) Outbound(By... Page 0 of 0 Show 50 items No data to display

The following table describes the labels in this screen.

Table 65 Monitor > VPN Monitor > SSL

LABEL DESCRIPTION
DisconnectSelect a connection and click this button to terminate the user's connection and delete corresponding session information from the Zyxel Device.
RefreshClick Refresh to update this screen.
# This field is a sequentialvalue, and it is not associated with a specific SSL.
UserThis field displays the account user name used to establish this SSL VPN connection.
AccessThis field displays the name of the SSL VPN application the user is accessing.
Login AddressThis field displays the IP address the user used to establish this SSL VPN connection.
Connected TimeThis field displays the time this connection was established.
Inbound (Bytes)This field displays the number of bytes received by the Zyxel Device on this connection.
Outbound (Bytes)This field displays the number of bytes transmitted by the Zyxel Device on this connection.

6.30 The L2TP over IPSec Screen

Click Monitor > VPN Monitor > L2TP over IPSec to open the following screen. Use this screen to display and manage the Zyxel Device's connected L2TP VPN sessions.

Figure 142 Monitor > VPN Monitor > L2TP over IPSec
L2TP over IPSec Current L2TP Session Disconnect Refresh User Name Hostname Assigned IP Public IP Page 0 of 0 Show 50 items No data to display

The following table describes the fields in this screen.

Table 66 Monitor > VPN Monitor > L2TP over IPSec

LABEL DESCRIPTION
DisconnectSelect a connection and click this button to disconnect it.
RefreshClick Refresh to update this screen.
#This field is a sequential value, and it is not associated with a specific L2TP VPN session.
User NameThis field displays the remote user's user name.
HostnameThis field displays the name of the computer that has this L2TP VPN connection with the Zyxel Device.
Assigned IPThis field displays the IP address that the Zyxel Device assigned for the remote user's computer to use within the L2TP VPN tunnel.
Public IPThis field displays the public IP address that the remote user is using to connect to the Internet.

6.31 The App Patrol Screen

Application patrol provides a convenient way to manage the use of various applications on the network. It manages general protocols (for example, HTTP and FTP) and instant messenger (IM), peer-to-peer (P2P), Voice over IP (VoIP), and streaming (RSTP) applications. You can even control the use of a particular application's individual features (like text messaging, voice, video conferencing, and file transfers).

Click Monitor > Security Statistics > App Patrol > Summary to display the following screen. This screen displays Application Patrol statistics based on the App Patrol profiles bound to Security Policy profiles.

Figure 143 Monitor > Security Statistics > App Patrol > Summary
Summary General Settings ✓ Collect Statistics since 2018-01-03 07:50:10 to 2018-01-04 08:08:37 Apply Reset Refresh Flush Data AppPatrol Statistics Application Forwarded ... Dropped Da... Rejected Da... Matched Au... Inbound Kbps Outbound K... Page 0 of 0 Show 50 items No data to display

The following table describes the labels in this screen.

Table 67 Monitor > Security Statistics > App Patrol > Summary

LABEL DESCRIPTION
Collect StatisticsSelect this check box to have the Zyxel Device collect app patrol statistics.The collection starting time displays after you clickApply. All of the statistics in this screen are for the time period starting at the time displayed here. The format is year, month, day and hour, minute, second. All of the statistics are erased if you restart the Zyxel Device or clickFlush Data. Collecting starts over and a new collection start time displays.
ApplyClickApplyto save your changes back to the Zyxel Device.
ResetClickResetto return the screen to its last-saved settings.
Refresh Click this button toupdate the report display.
Flush DataClick this button to discard all of the screen's statistics and update the report display.
App Patrol Statistics
# This field is a sequentialvalue, and it is not associated with a specific App Patrol session.
Application This is the protocol.
Forwarded Data (KB)This is how much of the application's traffic the Zyxel Device has sent (in kilobytes).
Dropped Data (KB)This is how much of the application's traffic the Zyxel Device has discarded without notifying the client (in kilobytes). This traffic was dropped because it matched an application policy set to "drop".
Rejected Data (KB)This is how much of the application's traffic the Zyxel Device has discarded and notified the client that the traffic was rejected (in kilobytes). This traffic was rejected because it matched an application policy set to "reject".
Matched Auto ConnectionThis is how much of the application's traffic the Zyxel Device identified by examining the IP payload.

Table 67 Monitor > Security Statistics > App Patrol > Summary

LABEL DESCRIPTION
Inbound KbpsThis field displays the amount of the application's traffic that has gone to the ZyWALL (in kilo bits per second).
Outbound KbpsThis field displays the amount of the application's traffic that has gone from the ZyWALL (in kilo bits per second).

6.32 The Content Filter Screen

Click Monitor > Security Statistics > Content Filter to display the following screen. This screen displays content filter statistics.

Figure 144 Monitor > Security Statistics > Content Filter
Summary General Settings Collect Statistics Apply Reset Refresh Flush Data Web Request Statistics Total Submit File: 0 Blocked: 0 Warned: 0 Passed: 0 Category Hit Summary Managed Web Pages: 0 Block Hit Summary Web Pages Warned by Category Service: 0 Web Pages Blocked by Custom Service: 0 Restricted Web Features: 0 Forbidden Web Sites: 0 URL Keywords: 0

The following table describes the labels in this screen.

Table 68 Monitor > Security Statistics > Content Filter

LABEL DESCRIPTION
General Settings
Collect StatisticsSelect this check box to have the Zyxel Device collect content filtering statistics.The collection starting time displays after you clickApply. All of the statistics in this screen are for the time period starting at the time displayed here. The format is year, month, day and hour, minute, second. All of the statistics are erased if you restart the Zyxel Device or clickFlush Data. Collecting starts over and a new collection start time displays.
ApplyClickApplyto save your changes back to the Zyxel Device.
ResetClickResetto return the screen to its last-saved settings.
Refresh Click this buttonto update the report display.
Flush DataClick this button to discard all of the screen's statistics and update the report display.
Web Request Statistics
Total Submit FileThis field displays the number of web pages that the Zyxel Device's content filter feature has checked.
Blocked This is the number of web pages that the Zyxel Device blocked access.
Warned This is the number of web pages for which the Zyxel Device displayed a warning message to the access requesters.
Passed This is the number of web pages to which the Zyxel Device allowed access.
Category Hit Summary
Managed Web PagesThis is the number of requested web pages that the Zyxel Device's content filtering service identified as belonging to a category that was selected to be managed.
Block Hit Summary
Web Pages Warned by Category ServiceThis is the number of web pages that matched an external database content filtering category selected in the Zyxel Device and for which the Zyxel Device displayed a warning before allowing users access.
Web Pages Blocked by Custom ServiceThis is the number of web pages to which the Zyxel Device did not allow access due to the content filtering custom service configuration.
Restricted Web FeaturesThis is the number of web pages to which the ZyWALL limited access or removed cookies due to the content filtering custom service's restricted web features configuration.
Forbidden Web SitesThis is the number of web pages to which the Zyxel Device did not allow access because they matched the content filtering custom service's forbidden web sites list.
URL KeywordsThis is the number of web pages to which the Zyxel Device did not allow access because they contained one of the content filtering custom service's list of forbidden keywords.

6.33 The Anti-Malware Screen

Click Monitor > Security Statistics > Anti-Malware > Summary to display the following screen. This screen displays anti-malware statistics.

Figure 145 Monitor > Security Statistics > Anti-Malware > Summary: Virus Name
Summary General Settings Collect Statistics Refresh Flush Data Summary Total Viruses Detected: 0 Statistics Top Entry By: Virus Name Add to white list Remove from white list Virus Name Hash Occurrence White List Page 0 of 0 Show 50 Items No data to display Apply Reset

The following table describes the labels in this screen.

Table 69 Monitor > Security Statistics > Anti-Malware > Summary: Virus Name

LABEL DESCRIPTION
Collect StatisticsSelect this check box to have the Zyxel Device collect anti-malware statistics.The collection starting time displays after you clickApply. All of the statistics in this screen are for the time period starting at the time displayed here. The format is year, month, day and hour, minute, second. All of the statistics are erased if you restart the Zyxel Device or clickFlush Data. Collecting starts over and a new collection start time displays.
ApplyClickApplyto save your changes back to the Zyxel Device.
ResetClickResetto return the screen to its last-saved settings.
Refresh Click this button to update the report display.
Flush DataClick this button to discard all of the screen's statistics and update the report display.
Total Viruses Detected This field displays the number of different viruses that the Zyxel Device has detected.
Top Entries ByUse this field to have the following (read-only) table display the top anti-malware log entries byVirus Name, Source IP, andDestination IP, Source IPv6andDestination IPv6. This table displays the most common, recent virus logs. See the log screen for less common virus logs or use a syslog server to record all virus logs.SelectVirus Nameto list the most common viruses that the Zyxel Device has detected.SelectSource IPto list the source IP addresses from which the Zyxel Device has detected the most virus-infected files.SelectDestination IPto list the most common destination IP addresses for virus-infected files that Zyxel Device has detected.SelectSource IPv6to list the source IPv6 addresses from which the Zyxel Device has detected the most virus-infected files.SelectDestination IPv6to list the most common destination IPv6 addresses for virus-infected files that Zyxel Device has detected.
Add to white listSelect an entry and click this to add it to the anti-malware white list.
Remove from white listSelect an entry and click this to remove it from the anti-malware white list.
# This field displays the entry's rank in the list of the top entries.
Virus nameThis column displays when you display the entries by Virus Name. This displays the name of a detected virus.
HashThis column displays a hash value, MD5 (Message Digest 5) and SHA (Secure Hash Algorithm), of the detected virus file.MD5 and SHA are hash algorithms used to authenticate packet data.
Source IPThis column displays when you display the entries by Source IP. It shows the source IP address of virus-infected files that the Zyxel Device has detected.
Source IPv6his column displays when you display the entries by Source IPv6. It shows the source IPv6 address of virus-infected files that the Zyxel Device has detected.
Destination IPThis column displays when you display the entries by Destination IP. It shows the destination IP address of virus-infected files that the Zyxel Device has detected.
Destination IPv6This column displays when you display the entries by Destination IPv6. It shows the destination IPv6 address of virus-infected files that the Zyxel Device has detected.
OccurrencesThis field displays how many times the Zyxel Device has detected the event described in the entry.
White ListClick thisto add this signature to the anti-malware white list.Click thisto remove this signature from the anti-malware white list.

The statistics display as follows when you display the top entries by source IP.

Figure 146 Monitor > Security Statistics > Anti-Malware > Summary: Source IP
Statistics Top Entry By: Source IP Source IP Occurrence Page 0 at 0 Show 50 Items No data to display

The statistics display as follows when you display the top entries by source IPv6.

Figure 147 Monitor > Security Statistics > Anti-Malware: Source IPv6
Statistics Top Entry By: Source IPv6 Source IPv6 Occurrence Page 0 of 0 Show 50 Items No data to display

The statistics display as follows when you display the top entries by destination IP.

Figure 148 Monitor > Security Statistics > Anti-Malware > Summary: Destination IP
Statistics Top Entry By: Destination IP Destination IP Occurrence Page 0 of 0 Show 50 items No data to display

The statistics display as follows when you display the top entries by destination IPv6.

Figure 149 Monitor > Security Statistics > Anti-Malware: Destination IPv6
Statistics Top Entry By: Destination IPv6 Destination IPv6 Occurrence Page 0 of 0 Show 50 items No data to display

6.34 The Reputation Filter Screen

Click Monitor > Security Statistics > Reputation Filter > Summary to display the following screen. This screen displays Reputation Filter statistics.

Figure 150 Monitor > Security Statistics > Reputation Filter > Summary
Summary General Settings Collect Statistics Refresh Flush Data Summary URL Scanned: 0 URL Hit Count: 0 URL Detected Add to white list Remove from white list Time Source IP Destination IP Botnet URL Threat Category Page 0 of 0 Show 50 Items No data to display Apply Reset

The following table describes the labels in this screen.

Table 70 Monitor > Security Statistics > Reputation Filter > Summary

LABEL DESCRIPTION
Collect StatisticsSelect this check box to have the Zyxel Device collect anti-malware statistics.The collection starting time displays after you clickApply. All of the statistics in this screen are for the time period starting at the time displayed here. The format is year, month, day and hour, minute, second. All of the statistics are erased if you restart the Zyxel Device or clickFlush Data. Collecting starts over and a new collection start time displays.
Refresh Click this button to update the report display.
Flush DataClick this button to discard all of the screen's statistics and update the report display.
Summary
IP ScannedThis field displays the total number of IPv4 addresses that have been scanned.
IP Hit CountThis field displays the total number of the hit counts on the scanned IPv4 addresses.
URL Scanned This field displays the total number of URLs that have been scanned.
URL Hit CountThis field displays the total number of the hit counts on the scanned URLs.
IP Detected
Add to white list Select anentry and click this to add it to the IP reputation white list.
Remove from white listSelect an entry and click this to remove it from the IP reputation white list.
TimeThis field displays the date and time the entry was created.
Malicious IP This field displays the IPv4 address with bad reputation.
Infected/Victim Host This field displays the MAC address of the infected host.
Threat Category This field displays the category of the entry.
Threat Level This field displays the threat level of the entry.
URL Detected
Add to white listSelect an entry and click this to add it to the URL Threat filtering white list.
Remove from white listSelect an entry and click this to remove it from the URL Threat filtering white list.
TimeThis field displays the date and time the entry was created.
Source IP This field displays the source IP address of traffic that you want to trace.
Destination IP This field displays the destination IP address of traffic.
Threat URL This field displays the URL of an infected website or a botnet C&C server.
Threat Category This field displays the category of the entry.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

6.35 The IDP Screen

Click Monitor > Security Statistics > IDP > Summary to display the following screen. This screen displays IDP (Intrusion Detection and Prevention) statistics.

Figure 151 Monitor > Security Statistics > IDP > Summary: Signature Name
Summary General Settings Collect Statistics Refresh Flush Data Summary Total Session Scanned: 0 Total Packet Dropped: 0 Total Packet Reset: 0 Statistics Top Entry By: Signature Name Add to white list Remove from white list Signature Name Signat... Type Severity Occurrence White List Page 0 of 0 Show 50 Items No data to display Apply Reset

The following table describes the labels in this screen.

Table 71 Monitor > Security Statistics > IDP > Summary

LABEL DESCRIPTION
Collect StatisticsSelect this check box to have the Zyxel Device collect IDP statistics.The collection starting time displays after you clickApply. All of the statistics in this screen are for the time period starting at the time displayed here. The format is year, month, day and hour, minute, second. All of the statistics are erased if you restart the Zyxel Device or clickFlush Data. Collecting starts over and a new collection start time displays.
ApplyClickApplyto save your changes back to the Zyxel Device.
ResetClickResetto return the screen to its last-saved settings.
Refresh Click this button to update the report display.
Flush DataClick this button to discard all of the screen's statistics and update the report display.
Total Session ScannedThis field displays the number of sessions that the Zyxel Device has checked for intrusion characteristics.
Total Packet DroppedThe Zyxel Device can detect and drop malicious packets from network traffic. This field displays the number of packets that the Zyxel Device has dropped.
Total Packet ResetThe Zyxel Device can detect and drop malicious packets from network traffic. This field displays the number of packets that the Zyxel Device has reset.
Top Entries ByUse this field to have the following (read-only) table display the top IDP log entries bySignature Name, Source IP or Destination IP. This table displays the most common, recent IDP logs. See the log screen for less common IDP logs or use a syslog server to record all IDP logs.SelectSignature Nameto list the most common signatures that the Zyxel Device has detected.SelectSource IP to list the source IP addresses from which the Zyxel Device has detected the most intrusion attempts.SelectDestination IP to list the most common destination IP addresses for intrusion attempts that the Zyxel Device has detected.
Add to white listSelect a signature and click this to add the selected signature to the IDP white list.
Remove from white listSelect a signature and click this to remove the selected signature from the IDP white list.
#This field displays the entry's rank in the list of the top entries.
Signature NameThis column displays when you display the entries bySignature Name. The signature name identifies the type of intrusion pattern. Click the hyperlink for more detailed information on the intrusion.
Signature IDThis column displays when you display the entries bySignature Name. The signature ID is a unique value given to each intrusion detected.
TypeThis column displays when you display the entries bySignature Name. It shows the categories of intrusions.
SeverityThis column displays when you display the entries bySignature Name. It shows the level of threat that the intrusions may pose.
Source IPThis column displays when you display the entries bySource. It shows the source IP address of the intrusion attempts.
Destination IPThis column displays when you display the entries byDestination. It shows the destination IP address at which intrusion attempts were targeted.
OccurrencesThis field displays how many times the Zyxel Device has detected the event described in the entry.
White ListClick thisto add this signature to the IDP white list.Click thisto remove this signature from the IDP white list.

The statistics display as follows when you display the top entries by source.

Figure 152 Monitor > Security Statistics > IDP > Summary: Source IP
Statistics Top Entry By: Source IP Source IP Occurrence Page of Show 50 Items No data to display

The statistics display as follows when you display the top entries by destination.

Figure 153 Monitor > Security Statistics > IDP > Summary: Destination IP
Statistics Top Entry By: Destination IP Destination IP Occurrence Page 0 of 0 Show 50 items No data to display

6.36 The Email Security Screens

The Email Security menu contains the Summary and Status screens.

6.36.1 Email Security Summary

Click Monitor > Security Statistics > Email Security > Summary to display the following screen. This screen displays spam statistics.

Figure 154 Monitor > Security Statistics > Email Security > Summary
Summary Status General Settings Collect Statistics Apply Reset Refresh Flush Data Email Summary Total Malls Scanned: 0 Safe Malls: 0 Safe Malls Detected by White List: 0 Spam Malls: 0 Spam Malls Detected by Block List: 0 Spam Malls Detected by Malicious Mail: 0 Spam Malls Detected by DNSBL: 0 Query Timeout: 0 When mail session threshold is reached Mail Sessions Forwarded: 0 Mail Sessions Dropped: 0 Statistics Top Sender By: Sender IP #▲ Sender IP Occurrence Page of 0 Show 50 items No data to display

The following table describes the labels in this screen.

Table 72 Monitor > Security Statistics > Email Security > Summary

LABEL DESCRIPTION
Collect StatisticsSelect this check box to have the Zyxel Device collect email security statistics.The collection starting time displays after you clickApply. All of the statistics in this screen are for the time period starting at the time displayed here. The format is year, month, day and hour, minute, second. All of the statistics are erased if you restart the Zyxel Device or clickFlush Data. Collecting starts over and a new collection start time displays.
ApplyClickApplyto save your changes back to the Zyxel Device.
ResetClickResetto return the screen to its last-saved settings.
Refresh Click this button to update the report display.
Flush DataClick this button to discard all of the screen's statistics and update the report display.
Email Summary
Total Mails ScannedThis field displays the number of emails that the Zyxel Device's email security feature has checked.
Safe MailsThis is the number of emails that the Zyxel Device has determined to not be spam.
Safe Mails Detected by White listThis is the number of emails that matched an entry in the Zyxel Device's email security white list.
Spam MailsThis is the number of emails that the Zyxel Device has determined to be spam.
Spam Mails Detected by Black ListThis is the number of emails that matched an entry in the Zyxel Device's email security black list.
Spam Mails Detected by Malicious MailThis is the number of emails that the Zyxel Device has determined to have malicious contents.
Spam Mails Detected by DNSBLThe Zyxel Device can check the sender and relay IP addresses in an email's header against DNS (Domain Name Service)-based spam Black Lists (DNSBLs). This is the number of emails that had a sender or relay IP address in the header which matched one of the DNSBLs that the Zyxel Device uses.
Query TimeoutThis is how many queries that were sent to the Zyxel Device's configured list of DNSBL domains or Mail Scan services and did not receive a response in time.
When mail session threshold is reached
Mail Sessions ForwardedThis is how many email sessions the Zyxel Device allowed because they exceeded the maximum number of email sessions that the email security feature can check at a time.You can see the Zyxel Device's threshold of concurrent email sessions on theEmail Security>Statusscreen.Use theEmail Security>Summaryscreen to set whether the Zyxel Device forwards or drops sessions that exceed this threshold.
Mail Sessions DroppedThis is how many email sessions the Zyxel Device dropped because they exceeded the maximum number of email sessions that the email security feature can check at a time.You can see the Zyxel Device's threshold of concurrent email sessions on theEmail Security>Statusscreen.Use theEmail Security>Summaryscreen to set whether the Zyxel Device forwards or drops sessions that exceed this threshold.
Statistics
Top Sender ByUse this field to list the top email or IP addresses from which the Zyxel Device has detected the most spam.SelectSender IP to list the source IP addresses from which the Zyxel Device has detected the most spam.SelectSender Email Addressto list the top email addresses from which the Zyxel Device has detected the most spam.
# This field displays the entryy's rank in the list of the top entries.
Sender IPThis column displays when you display the entries bySender IP. It shows the source IP address of spam emails that the Zyxel Device has detected.
Sender Email AddressThis column displays when you display the entries bySender Email Address. This column displays the email addresses from which the Zyxel Device has detected the most spam.
OccurrenceThis field displays how many spam emails the Zyxel Device detected from the sender.

6.36.2 The Email Security Status Screen

Click Monitor > Security Statistics > Email Security > Status to display the Email Security Status screen.

Use the Email Security Status screen to see how many email sessions the email security feature is scanning and statistics for the DNSBLs.

Figure 155 Monitor > Security Statistics > Email Security > Status
Summary Status Resource Status Concurrent Mail Session Scanning 0% 0/200 Refresh Flush Mail Scan Statistics Service Total Queries Avg. Response (sec) No Response 1 Mail Scan 0 0.00 0 2 IP Reputation 0 0.00 0 Page 1 of 1 Show 50 items Displaying 1 - 2 of 2 DNSBL Statistics DNSBL Domain Total Queries Avg. Response Time ... No Response Page 0 of 0 Show 50 items No data to display

The following table describes the labels in this screen.

Table 73 Monitor > Security Statistics > Email Security > Status

LABEL DESCRIPTION
Resource Status
Concurrent Mail Session ScanningThe darker shaded part of the bar shows how much of the Zyxel Device's total spam checking capability is currently being used.The lighter shaded part of the bar and the pop-up show the historical high.The first number to the right of the bar is how many email sessions the Zyxel Device is presently checking for spam. The second number is the maximum number of email sessions that the Zyxel Device can check at once. An email session is when an email client and email server (or two email servers) connect through the Zyxel Device.
RefreshClick this button to update the information displayed on this screen.

Table 73 Monitor > Security Statistics > Email Security > Status

LABEL DESCRIPTION
FlushClick this button to clear the DNSBL statistics. This also clears the concurrent mail session scanning bar's historical high.
Mail Scan StatisticsThese are the statistics for the service the Zyxel Device uses. These statistics are for when the Zyxel Device actually queries the service servers.
# This is the entry's index number in the list.
Service This displays the name of the service.
Total QueriesThis is the total number of queries the Zyxel Device has sent to this service.
Avg. Response Time (sec)This is the average for how long it takes to receive a reply from this service.
No ResponseThis is how many queries the Zyxel Device sent to this service without receiving a reply.
DNSBL StatisticsThese are the statistics for the DNSBL the Zyxel Device uses. These statistics are for when the Zyxel Device actually queries the DNSBL servers. Matches for DNSBL responses stored in the cache do not affect these statistics.
# This is the entry's index number in the list.
DNSBL DomainThese are the DNSBLs the Zyxel Device uses to check sender and relay IP addresses in emails.
Total QueriesThis is the total number of DNS queries the Zyxel Device has sent to this DNSBL.
Avg. Response Time (sec)This is the average for how long it takes to receive a reply from this DNSBL.
No ResponseThis is how many DNS queries the Zyxel Device sent to this DNSBL without receiving a reply.

6.37 The SSL Inspection Screens

The Zyxel Device uses SSL Inspection to decrypt SSL traffic, sends it to the Security Service engines for inspection, then encrypts traffic that passes inspection and forwards it. You must enable SSL Inspection if you want to use Content Filtering 2.0 Safe Search.

Click Monitor > Security Statistics > SSL Inspection > Summary to display the following screen.

Figure 156 Monitor > Security Statistics > SSL Inspection > Summaryt
Summary Certificate Cache List General Settings ✓ Collect Statistics since 2018-01-03 07:50:10 to 2018-01-04 08:59:53 Apply Reset Refresh Flush Data Status Maximum Concurrent Sessions: 2000 Concurrent Sessions: 0 Summary Total SSL Sessions: 0 Sessions Inspected: 0 Decrypted (Kbytes): 0 Encrypted (Kbytes): 0 Sessions Blocked: 0 Sessions Passed: 0

The following table describes the labels in this screen.

Table 74 Monitor > Security Statistics > SSL Inspection > Summary

LABEL DESCRIPTION
Collect StatisticsSelect this check box to have the Zyxel Device collect SSL Inspection statistics.The collection starting time displays after you clickApply. All of the statistics in this screen are for the time period starting at the time displayed here. The format is year, month, day and hour, minute, second. All of the statistics are erased if you restart the Zyxel Device or clickFlush Data. Collecting starts over and a new collection start time displays.
ApplyClickApplyto save your changes back to the Zyxel Device.
ResetClickResetto return the screen to its last-saved settings.
Refresh Click this button to update the report display.
Flush DataClick this button to discard all of the screen's statistics and update the report display.
Status
Maximum Concurrent SessionsThis shows the maximum number of simultaneous SSL Inspection sessions allowed for your Zyxel Device model.
Concurrent SessionsThis shows the actual number of simultaneous SSL Inspection sessions in progress.
Summary
Total SSL SessionsThis is the total of SSL sessions inspected and number of sessions blocked and number of sessions passed since data was last flushed or the Zyxel Device last rebooted afterCollect Statisticswas enabled.
Sessions InspectedThis shows the total number of SSL sessions inspected since data was last flushed or the Zyxel Device last rebooted afterCollect Statisticswas enabled
Decrypted (Kbytes)This shows the number of kilobytes (KB) of data that was decrypted for Security Service inspection.
Encrypted (Kbytes)This shows the number of kilobytes (KB) of data that was re-encrypted after Security Service inspection and then forwarded.
Sessions Blocked This shows the number of SSL sessions blocked.
Sessions Passed This shows the number of SSL sessions passed.

6.37.1 Certificate Cache List

SSL traffic to a server to be excluded from SSL Inspection is identified by its certificate. Traffic in an Exclude List is not intercepted by SSL Inspection.

Click Monitor > Security Statistics > SSL Inspection > Certificate Cache List to display a screen that shows details on SSL traffic going to servers identified by its certificate and an option to add that traffic to the Exclude List.

Figure 157 Monitor > Security Statistics > SSL Inspection > Certificate Cache List
Summary Certificate Cache List Certificate Cache List Add to Exclude List In Excl... Time Common Name Server Name I... SSL Version Destination Valid Time (sec) Page 0 of 0 Show 50 items No data to display Display Latest 50 Entries of Certificate Cache List Refresh

The following table describes the labels in this screen.

Table 75 Monitor > Security Statistics > SSL Inspection > Certificate Cache List

LABEL DESCRIPTION
Certificate Cache List
Add to Exclude listSelect and item in the list and click this icon to add the common name (CN) to the Exclude List.
#This field is a sequential value, and it is not associated with a specific entry.
In Exclude ListIf any one of common name, DNS name, email address or IP address of the certificate is in the Exclude List, then traffic to the server identified by the certificate is excluded from inspection.The icons here are defined as follows:Gray: The identity of the certificate is not in the Exclude ListGreen: The common name of the certificate is in the Exclude ListYellow: The common name of certificate is not in the Exclude List but one of the DNS name, email address or IP address is.
TimeThis is the latest date (yyyy-mm-dd) and time (hh-mm-ss) that the record in the certificate cache list was met.
Common NameThis displays the common name in the certificate of the SSL traffic destination server.
Server Name IndicationServer Name Indication (SNI) is the domain name entered in the browser, FTP client, etc. to begin the SSL session with the server. It allows multiple SSL sessions to the same IP address and port number with different certificates from different SNI. This field displays the SNI for this SSL session.
SSL VersionThis field shows the SSL version. SSLv3/TLS1.0 is currently supported.
DestinationThis displays the IP address and port number of the SSL traffic destination server.
Valid TimeThis displays the cache item expiry time in seconds. The cache item is deleted when the remaining time expires.
RefreshClick this button to update the information on the screen.

6.38 Log Screens

Log messages are stored in two separate logs, one for regular log messages and one for debugging messages. In the regular log, you can look at all the log messages by selecting All Logs, or you can select a specific category of log messages (for example, security policy or user). You can also look at the debugging log by selecting Debug Log. All debugging messages have the same priority.

6.38.1 View Log

To access this screen, click Monitor > Log. The log is displayed on the following screen.

Note: When a log reaches the maximum number of log messages, new log messages automatically overwrite existing log messages, starting with the oldest existing log message first.

- The maximum possible number of log messages in the Zyxel Device varies by model.

Events that generate an alert (as well as a log message) display in red. Regular logs display in black. Click a column's heading cell to sort the table entries by that column's criteria. Click the heading cell again to reverse the sort order. The Web Configurator saves the filter settings if you leave the View Log screen and return to it later.

Figure 158 Monitor > Log > View Log
View Log View AP Log Show Filter Logs Category: All Logs Email Log Now Refresh Clear Time Priority Categ... Message Source Destination Note 1 2018-0... error myZyX... Skip get_time_zone, parameter missing! 2 2018-0... notice myZyX... GetTimeZone: Processing... 3 2018-0... error myZyX... Skip get_time_zone, parameter missing! 4 2018-0... notice myZyX... GetTimeZone: Processing... 5 2018-0... error myZyX... Skip get_time_zone, parameter missing! 6 2018-0... notice myZyX... GetTimeZone: Processing... 7 2018-0... error myZyX... Skip get_time_zone, parameter missing! 8 2018-0... notice myZyX... GetTimeZone: Processing... 9 2018-0... error myZyX... Skip get_time_zone, parameter missing! 10 2018-0... notice myZyX... GetTimeZone: Processing... 11 2018-0... error myZyX... Skip get_time_zone, parameter missing! 12 2018-0... notice myZyX... GetTimeZone: Processing...

The following table describes the labels in this screen.

Table 76 Monitor > Log > View Log

LABEL DESCRIPTION
Show (Hide) FilterClick this button to show or hide criteria that allow you to filter logs that will be displayed.If the filter settings are hidden, theCategory, Email Log Now, Refresh, andClearfields are available.If the filter settings are shown, theCategory,Priority, Source Address, Destination Address, Source Interface, Destination Interface, Service, Keyword, Protocol and Search fields are available.
CategorySelect the type of log message(s) you want to view. You can also viewAll Logsat one time, or you can view theDebug Log.
PriorityThis displays when you show the filter. Select the priority of log messages to display. The log displays the log messages with this priority or higher. Choices are:any, emerg, alert,crit, error, warn, notice, andinfo, from highest priority to lowest priority. This field is grayed out if theCategoryis Debug Log.
LABELDESCRIPTION
Source AddressThis displays when you show the filter. Type the source IP address of the incoming packet that generated the log message. Do not include the port in this filter.
Destination AddressThis displays when you show the filter. Type the IP address of the destination of the incoming packet when the log message was generated. Do not include the port in this filter.
Source InterfaceThis displays when you show the filter. Type the source interface of the incoming packet that generated the log message.
Destination InterfaceThis displays when you show the filter. Type the interface of the destination of the incoming packet when the log message was generated.
ServiceThis displays when you show the filter. Select the service whose log messages you would like to see. The Web Configurator uses the protocol and destination port number(s) of the service to select which log messages you see.
KeywordThis displays when you show the filter. Type a keyword to look for in the Message, Source, Destination and Note fields. If a match is found in any field, the log message is displayed. You can use up to 63 alphanumeric characters and the underscore, as well as punctuation marks ( )' ,:?! +-*/= #$% @; the period, double quotes, and brackets are not allowed.
ProtocolThis displays when you show the filter. Select a service protocol whose log messages you would like to see.
SearchThis displays when you show the filter. Click this button to update the log using the current filter settings.
ResetClick Reset to return the screen to its last-saved settings.
Email Log NowClick this button to send log message(s) to the Active email address(es) specified in the Send Log To field on the Log Settings page.
Refresh Click this button to update the information on the screen.
ClearClick this button to clear the whole log, regardless of what is currently displayed on the screen.
# This field is a sequential value, and it is not associated with a specific log message.
Time This field displays the time the log message was recorded.
PriorityThis field displays the priority of the log message. It has the same range of values as the Priority field above.
CategoryThis field displays the log that generated the log message. It is the same value used in the Category field above.
MessageThis field displays the reason the log message was generated. The text "[count=x]", where x is a number, appears at the end of the Message field if log consolidation is turned on and multiple entries were aggregated to generate into this one.
SourceThis field displays the source IP address and the port number in the event that generated the log message.
DestinationThis field displays the destination IP address and the port number of the event that generated the log message.
NoteThis field displays any additional information about the log message.

6.38.2 View AP Log

Click on Monitor > Log > View AP Log to open the following screen.

Figure 159 Monitor > Log > View AP Log
View Log View AP Log Show Filter AP Selection Select an AP: Please select ano.. Query Log Query Status: init Log Query Information AP Information: N/A Log File Status: Empty Last Log Query Time: N/A Logs Display: All Logs Email Log Now Refresh Clear time Pr... C... Message Source Destination Note Page 0 of 0 Show 50 Items No data to display

The following table describes the labels in this screen.

Table 77 Monitor > Log > View AP Log

LABEL DESCRIPTION
Show Filter Click this buttonto show or hide the filter settings.If the filter settings are hidden, the Display, Email Log Now, Refresh, and Clear fields are available.If the filter settings are shown, the Display, Priority, Source Address, Destination Address, Source Interface, Destination Interface, Service, Keyword, Protocol, and Search fields are available.
Select an AP Click thepull down menu to choose an AP.
Query Click Query to create a Query log.
Log Query Status The field displays the
AP Information This field displays the AP information. N/A is displayed when
Log File StatusThis field displays how many logs are available. It will display Empty if there's none.
Last Log Query TimeThis field displays the most recent time a log query was solicited.
DisplaySelect the category of log message(s) you want to view. You can also view All Logs at one time, or you can view the Debug Log.
PriorityThis displays when you show the filter. Select the priority of log messages to display. The log displays the log messages with this priority or higher. Choices are: any, emerg, alert, crit, error, warn, notice, and info, from highest priority to lowest priority. This field is read-only if the Category is Debug Log.
Source Address Type the IP address of the source AP.
Destination AddressThis displays when you show the filter. Type the IP address of the destination of the incoming packet when the log message was generated. Do not include the port in this filter.
Source InterfaceThis displays when you show the filter. Type the source interface of the incoming packet that generated the log message.
Destination InterfaceThis displays when you show the filter. Type the interface of the destination of the incoming packet when the log message was generated.
ServiceSelect a policy service available from Zyxel Device from the pull down menu.
KeywordType a keyword of the policy service available from Zyxel Device to search for a log.
ProtocolSelect the protocol of the AP from the pull down menu.
Search Click this to start the search.
Email Log NowClick this button to send log message(s) to the Active email address(es) specified in the Send Log To field on the Log Settings page.
Refresh Click this button to update the information on the screen.
ClearClick this button to clear the whole log, regardless of what is currently displayed on the screen.
# This field is a sequential value, and it is not associated with a specific log message.
Time This field displays the time the log message was recorded.
PriorityThis displays when you show the filter. Select the priority of log messages to display. The log displays the log messages with this priority or higher. Choices are: any, emerg, alert, crit, error, warn, notice, and info, from highest priority to lowest priority. This field is read-only if the Category is Debug Log.
CategoryThis field displays the log that generated the log message. It is the same value used in the Display and (other) Category fields.
Message This field displays the message of the log.
SourceThis displays the source IP address of the selected log message.
DestinationThis displays the source IP address of the selected log message.
NoteThis field displays any additional information about the log message.

6.38.3 Dynamic Users Log

Use this screen to view the Zyxel Device's dynamic guest account log messages. Click Monitor > Log > Dynamic Users Log to access this screen.

Figure 160 Monitor > Log > Dynamic Users Log
View Log View AP Log Dynamic Users Log Logs Begin Date: End Date: Begin Time: End Time: Note: The search button is a quest to create time. Search Refresh Clear St... Userma... Create... Remai... Time P... Exptali... Quota ... Remai... Bandw... Charge Phone ... Page 0 of 0 Show 50 Items No data to display

The following table describes the labels in this screen.

Table 78 Monitor > Log > Dynamic Users Log

LABEL DESCRIPTION
Begin/End DateSelect the first and last dates to specify a time period. The Zyxel Device displays log messages only for the accounts created during the specified time period after you click Search.
Begin/End TimeSelect the begin time of the first date and the end time of the last date to specify a time period. The Zyxel Device displays log messages only for the accounts created during the specified time period after you click Search.
LABELDESCRIPTION
SearchClick this button to update the information on the screen using the filter criteria in the date and time fields.
Refresh Click this button to update the information in the screen.
ClearClick this button to delete the log messages for invalid accounts.
# This is the index number of the dynamic guest account in the list.
Status This field displays whether an account expires or not.
Username This field displays the user name of the account.
Create Time This field displays when the account was created.
Remaining TimeThis field displays the amount of Internet access time remaining for each account.
Time PeriodThis field displays the total account of time the account can use to access the Internet through the Zyxel Device.
Expiration TimeThis field displays the date and time the account becomes invalid.Note: Once the time allocated to a dynamic account is used up or a dynamic account remains un-used after the expiration time, the account is deleted from the account list.
Quota (T/U/D)This field displays how much data in both directions (Total) or upstream data (Upload) and downstream data (Download) can be transmitted through the WAN interface before the account expires.
Remaining Quota (T/U/D)This field displays the remaining amount of data that can be transmitted or received by each account. You can see the amount of either data in both directions (Total) or upstream data (Upload) and downstream data (Download).
Bandwidth (U/D)This field displays the maximum upstream (Upload) and downstream (Download) bandwidth allowed for the user account in kilobits per second.
Real NameThis field displays the user's name of the account.
Email This field displays the email of the account.
ChargeThis field displays the total cost of the account.
Payment InfoThis field displays the method of payment for each account.
Phone NumThis field displays the telephone number for the user account.

CHAPTER 7 Licensing

7.1 Registration Overview

Use the Configuration > Licensing > Registration screens to register your Zyxel Device and manage its service subscriptions.

  • Use the Registration screen (see Section 7.1.2 on page 197) to refresh Zyxel Device registration, go to portal.myZyxel.com to register your Zyxel Device and activate a service, such as content filtering.
  • Use the Service screen (see Section 7.1.3 on page 197) to display the status of your service registrations and upgrade licenses.
  • Use the Signature Update screen (see Section 7.2.2 on page 200) to download the latest signatures for your licensed services.

7.1.1 What you Need to Know

This section introduces the topics covered in this chapter.

Subscription Services Available

See Configuration > Licensing > Registration > Service for the subscription services that your Zyxel Device supports. Zyxel offers two types of security packs for your Zyxel Device. The subscription services you can use on the Zyxel Device vary depending on the security pack license you purchase. See the table below for services available in each pack.

You can purchase an iCard and enter its license key at myZyxel to extend a service.

USG FLEX Series

Table 79 USG FLEX Series Security Subscription Services

SERVICE MODULE SERVICE BUNDLE LICENSE
Web Filtering ContentFilter V
Application Security AppPatrol V
Anti-Malware Anti-Malware V
IPS IDP V
Email Security (Anti-Spam)Email Security V
SecuReporter PremiumSecuReporter Premium 1-Year Standard Service• Unlimited log retention period• Log analysis for 30 days

7.1.2 Registration Screen

Click the link in this screen to register your Zyxel Device at myZyxel. Then click Refresh in this screen and wait a few moments for the registration information to update. If the page does not refresh, make sure the Internet connection is working and click Refresh again. The Zyxel Device should already have Internet access and be able to access myZyxel. Click Configuration > Licensing > Registration in the navigation panel to open the screen as shown next.

Click on the icon to go to the OneSecurity website where there is guidance on configuration walkthrough and other information.

Figure 161 Configuration > Licensing > Registration
Registration Service Registration Status Configuration Wakthrough Device Registration Status: Registered Refresh Note: If you want to register myZyxel, please go to portal.myszyel.com.

7.1.3 Service Screen

Use this screen to display the status of your service registrations and upgrade licenses. To activate or extend a standard service subscription, purchase an iCard and enter the iCard's PIN number (license key) at myZyxel. Click Activate in this screen to enable both Trial and Standard services on this Zyxel Device. Click Configuration > Licensing > Registration > Service to open the screen as shown next.

Figure 162 Configuration > Licensing > Registration > Service - USG FLEX 500
Registration Service Service Status Service Status Service Type Expiration Date Count Action 1 Web Filtering(CF) Activated Standard 2021-9-9 N/A Renew 2 IPS(IDP) Activated Standard 2021-9-9 N/A Renew 3 Application Patrol Activated Standard 2021-9-9 N/A Renew 4 Anti-Malware Activated Standard 2021-9-9 N/A Renew 5 Email Security(Anti-Spam) Activated Standard 2021-9-9 N/A Renew 6 SecuReporter Activated Trial 2021-9-9 N/A Buy 7 Managed AP Service Default 8 Buy Activate 8 Hotspot Management One-Ti... Activated Standard N/A 9 Concurrent Device Upgrade Default 200 Buy Activate 10 Device HA Pro Activated Standard N/A 11 Firmware Upgrade Service Activated N/A Page 1 of 1 Show 50 items Displaying 1 - 11 of 11 Service Refresh Service License Refresh Note: Only the licenses that are currently running on the device will be displayed on this service page. You can go to portal.myzxel.com to view and manage all your licenses in stock.

The following table describes the labels in this screen.

Table 80 Configuration > Licensing > Registration > Service

LABEL DESCRIPTION
Service Status
# This is the entry's position in the list.
ServiceThis lists the name of services or service modules that are available on the Zyxel Device.
Web Filtering (CF):This is a license to a database that can block websites by category, such as Gambling.
IPS (IDP)This is a license to detect Intrusion Detection and Prevention attacks.
Application PatrolThis is a license to use signatures for Application Patrol inspection to manage the use of various applications on the network.
Anti-Malware This is a license for signatures to detect malware patterns in files.
Email Security (Anti-Spam)This is a license to use anti-spam signatures to mark or discard spam (unsolicited commercial or junk email).
SecuReporterThis is a license that allows SecuReporter to collect and analyze logs from your Zyxel Device in order to identify anomalies, notify you of potential internal or external threats, and report on network usage. The Zyxel Device retains logs up to 7 days.
SecuReporter PremiumThis is a license that allows SecuReporter to collect and analyze logs from your Zyxel Device in order to identify anomalies, notify you of potential internal or external threats, and report on network usage. The Zyxel Device retains logs up to 1 year.
Managed AP ServiceThis is a license to manage more APs than the default for your Zyxel Device when the AP controller is enabled.
Hotspot Management Subscription ServiceThis is a license to manage hotspot functions such as Billing, Printer Manager, Free Time, IPnP, Walled Garden and Advertisement.
Concurrent Device UpgradeThis is a license to increase the number of devices (based on unique MAC address) that can log in and use the Zyxel Device Hotspot at the same time.
Device HA ProThis is a license for professional High Availability (HA) that lets a backup Zyxel Device automatically take over if the master Zyxel Device fails.
Firmware Upgrade ServiceThis is a free license to get Cloud Helper notifications when new firmware is available. You must register your Zyxel Device at myZyxel.
StatusThis field displays whether a service license is enabled at myZyxel (Activated) or not (Not Activated) or expired (Expired). It displays the remaining Grace Period if your license hasExpired.It displays Not Licensed if there isn't a license to be activated for this service.Default displays for quantity-based licenses when the Zyxel Device is currently using the allowed free number without a license. For example, if a Zyxel Device is allowed to manage x number of APs without a license and it is currently using that number, then Managed AP ServiceStatus displays Default.
Service TypeThis field displays whether you applied for a trial application (Trial) or registered a service with your iCard's PIN number (Standard). This field is blank when a service is not activated.
Expiration DateThis field displays the date your service license expires or the date the grace period expires if the license has already expired.You can continue to use IDP/AppPatrol, Anti-Malware, Content Filter, Email Security during the grace period. After the grace period ends, all of these features are disabled.
CountThis field displays how many instances of a service you can use with your current license.N/A means a count does not apply to this service.
ActionIf you need a license or a trial license has expired, clickBuyto buy a new one. If a Standard license has expired, clickRenewto extend the license.Then, clickActivateto connect with the myZyxel server to activate the new license.
Service License RefreshClick this button to renew service license information (such as the registration status and expiration day).Note: It is recommended you use this button after you register for a new service.

7.2 Signature Update

This section shows you how to update the signature packages of the Zyxel Device.

- Use the Configuration > Licensing > Signature Update screen (Section 7.2.2 on page 200) to update the signatures used for a service, such as IDP and application patrol.

7.2.1 What you Need to Know

  • You need a valid service registration to update the anti-malware signatures, the URL Threat filter signatures, the IDP signatures and the App-Patrol signatures.
  • You do not need a service registration to update the system-protection signatures.
  • Schedule signature updates for a day and time when your network is least busy to minimize disruption to your network.
  • Your custom signature configurations are not over-written when you download new signatures.

Note: The Zyxel Device does not have to reboot when you upload new signatures.

7.2.2 The Signature Screen

Click Configuration > Licensing > Signature Update to display the following screen.

Figure 163 Configuration > Licensing > Signature Update
Signature Service Status Feature Type C... Released Date Last... Action Anti-Malware Anti-Malware Sig... 1.... 2018-01-01 00:00:00 (UTC+08:00) 201... Cloud Threat Dat... 1.... 2017-12-11 13:46:40 (UTC+08:00) App-Patrol App-Patrol 1.... 2018-01-25 09:45:25 (UTC+08:00) N/A IDP IDP 1.... 2018-01-01 13:10:00 (UTC+08:00) 201... Botnet Filter Botnet Filter 1.... 2017-04-01 11:25:37 (UTC+08:00) 201... IP Reputation IP Reputation 1.... 2019-01-30 10:51:46 (UTC+08:00) N/A

The following table describes the labels in this screen.

Table 81 Configuration > Licensing > Signature Update

LABEL DESCRIPTION
Service StatusThe following fields display the status and information on the current signature set that the Zyxel Device is using.
Feature This field displays the name of the services available on the Zyxel Device.
Type This field displays the type of service engine used by the Zyxel Device.
Current VersionThis field displays the signatures version number currently used by the Zyxel Device. This number gets larger as new signatures are added.
Released DateThis field displays the date and time the set was released.
Last SyncThis field displays the date and time the Zyxel Device last checked for new signatures at myZyxel.
ActionClick theUpdateicon to have the Zyxel Device immediately check for new signatures at myZyxel. If new signatures are found, they are then downloaded to the Zyxel Device.Click theScheduleicon to have the Zyxel Device automatically check for new signatures regularly at the time and day specified. You should select a time when your network is not busy for minimal interruption.

7.2.3 Auto Update

Click the Schedule icon of a service to display the following screen.

Figure 164 Configuration > Licensing > Signature Update: Schedule > Auto Update
Anti-Malware Auto Update ✓ Auto Update ○ Hourly ○ Daily ○ Weekly 0 (Hour) Sunday (Day) 0 (Hour) OK

The following table describes the labels in this screen.

Table 82 Configuration > Licensing > Signature Update: Schedule > Auto Update

LABEL DESCRIPTION
Auto UpdateSelect this check box to have the Zyxel Device automatically check for new signatures regularly at the time and day specified.You should select a time when your network is not busy for minimal interruption.
HourlySelect this option to have the Zyxel Device check for new signatures every hour.
DailySelect this option to have the Zyxel Device check for new signatures every day at the specified time. The time format is the 24 hour clock, so '23' means 11 PM for example.
WeeklySelect this option to have the Zyxel Device check for new signatures once a week on the day and at the time specified.
OK Click this button to save your changes to the Zyxel Device.

CHAPTER 8 Wireless

8.1 Overview

Use the Wireless screens to configure how the Zyxel Device manages supported Access Points (APs). Supported APs should be in managed mode. See the product page Licenses tab for a list of supported APs.

8.1.1 What You Can Do in this Chapter

  • Use the Controller screen (Section 8.2 on page 202) to set how the Zyxel Device allows new APs to connect to the network and set the country code of APs that are connected to the Zyxel Device.
  • Use the AP Management screens (Section 8.3 on page 204) to manage all of the APs connected to the Zyxel Device.
  • Use the Rogue AP screen (Section 8.4 on page 220) to assign APs either to the rogue AP list or the friendly AP list.
  • Use the Auto Healing screen (Section 8.5 on page 223) to extend the wireless service coverage area of the managed APs when one of the APs fails.
  • Use the RTLS screen (Section 8.6 on page 224) to allow managed APs with battery-powered Wi-Fi tags be part of Ekahau RTLS (Real Time Location Service). RTLS can track the location of APs managed by the Zyxel Device to create maps, alerts, and reports.

8.2 Controller Screen

Use this screen to set how the Zyxel Device allows new APs to connect to the network. Click Configuration > Wireless > Controller to access this screen.

Figure 165 Configuration > Wireless > Controller
Configuration Controller Setting Country Code: USA Registration Type Manual Always Accept Apply Reset

Each field is described in the following table.

Table 83 Configuration > Wireless > Controller

LABEL DESCRIPTION
Country CodeSelect the country code of APs that are connected to the Zyxel Device to be the same as where the Zyxel Device is located/installed. The available channels vary depending on the country you selected.
Registration TypeSelectManualto add each AP to the Zyxel Device for management, orAlways Acceptto automatically add APs to the Zyxel Device for management.If you selectManual, then go toMonitor > Wireless > AP Information > AP List, select an AP to be managed and then clickAdd to Mgmt AP List. That AP will then appear inConfiguration > Wireless > Controller > Mgmt. AP List.Note: Select theManualoption for managing a specific set of APs. This is recommended as the registration mechanism cannot automatically differentiate between friendly and rogue APs.APs must be connected to the Zyxel Device by a wired connection or network.
ApplyClickApplyto save your changes back to the Zyxel Device.
ResetClickResetto return the screen to its last-saved settings.

8.2.1 Connecting an AP to the Zyxel Device

  • You can connect an AP directly to one of the Ethernet ports on the Zyxel Device. You can also connect an AP indirectly to the Zyxel Device through the local network.
  • If an AP and the Zyxel Device are on the same subnet, the AP will automatically detect and connect to the Zyxel Device.
  • If an AP and the Zyxel Device are on different subnets, then you can must configure the AP to connect to the Zyxel Device. You can do this manually or by configuring DHCP Option 138 on the AP's DHCP server.
  • After an AP has successfully connected to the Zyxel Device, the AP appears in the AP List on MONITOR > Wireless > AP Information.

8.2.2 Connecting an AP to the Zyxel Device Manually

1 Ensure that the Zyxel Device has a static IP address.
2 Connect to and log on to the AP using a web browser.
3 On the AP, go to CONFIGURATION > Network > AC Discovery.
4 Under Discovery Setting, select Manual.
5 Under Primary static AC IP, enter the IP address of the Zyxel Device.
6 Click Apply.
The Zyxel Device can now manage the AP.

8.2.3 Connecting an AP to the Zyxel Device Using DHCP Option 138

1 Ensure that the Zyxel Device has a static IP address.

2 Log on to the DHCP server and configure settings for the network in which the AP is located.

3 Add a new DHCP option with the following values:

Name: Capwap AC

Code: 138

Type: IP Address

Value:

4 Restart the AP.

The AP picks up a new DCHP-assigned IP address. The Zyxel Device can now manage the AP.

Use the AP Management screens to manage all of the APs connected to the Zyxel Device.

8.3 AP Management Screens

Use these screens to manage all of the APs connected to the Zyxel Device. Click Configuration > Wireless > AP Management to access these screens.

Click on the icon to go to the OneSecurity website where there is guidance on configuration walkthroughs and other information.

8.3.1 Mgmt. AP List

Figure 166 Configuration > Wireless > AP Management > Mgmt. AP List
Mgmt. AP List AP Policy AP Group Firmware Hide Advanced Settings Filter AP List: All Status: All Keyword: Search Reset AP List Enable Column Freeze Status Description CPU Usage IP Address MAC Address Station 2.4G Station 5G Recent On-In Page 0 of 0 Show 50 Items No data to display Apply Refresh

Each field is described in the following table.

Table 84 Configuration > Wireless > AP Management > Mgmt. AP List

LABEL DESCRIPTION
FilterClick Show Advanced Settings to reveal Filter fields where you can display managed APs by status, keyword or those managed by the Nebula portal.
AP List Select the typeof APs you want to display.Select All to show all kinds of APs that are currently or used to be connected to the Zyxel Device.Select NebulaFlexPRO to show the APs that can work in Nebula cloud management mode.
Status Select the status of APs you want to display.
KeywordEnter a keyword to display the APs that include it in their AP information, such as model number, firmware version, MAC address and so on. This field is case-sensitive.
Search Click this to update the list of APs based on the search criteria.Your search criteria is retained when navigating between screens.
ResetClick this to return the search criteria to the factory defaults and display all currently or previously connected APs without a filter.
Enable Column FreezeSelect this to lock the index columns in place while scrolling to the right.
Edit the selected ruleSelect an AP and click this to change the selected AP's properties, such as its group, radio, VLAN and port settings.
Add to Mgmt AP ListSelect an AP and click this to add the selected AP to the managed AP list.
ZYXEL USGFLEX700-GB0101F - Mgmt. AP List - 2Select one or multiple APs and click this button to force the AP(s) to restart.
Remove the selected ruleSelect one or multiple APs and click this button to remove the AP(s) from the manged AP list.Note: If on theConfiguration > Wireless > Controllerscreen you set theRegistration Type to Always Accept, then as soon as you remove an AP from this list it reconnects.
DCS NowSelect one or multiple APs and click this button to use DCS (Dynamic Channel Selection) to allow the AP to automatically find a less-used channel in an environment where there are many APs and there may be interference.Note: You should have enabled DCS in the applied AP radio profile before the APs can use DCS.Note: DCS is not supported on the radio which is working in repeater AP mode.
More InformationSelect an AP and click this to view a daily station count about the selected AP. The count records station activity on the AP over a consecutive 24 hour period.
Select an online AP and click this button to go to theMonitor > Wireless > AP Information > Radio Listscreen to view detailed information about the AP's radios.
Select one or multiple APs and click this button to go to theMonitor > Log > View Logscreen to view the selected AP's current log messages.
NebulaSelect an AP and click this to open a screen where you can set whether the AP's IP address and VLAN settings will be changed when it goes into Nebula cloud management mode.Note: The AP will be set to Nebula cloud management mode and removed from the managed AP list right after you clickOK.
NowSelect one or more APs and click this button to update the APs' firmware version.
Select an AP and click this button to enable the AP's LED suppression mode. All the LEDs of the AP will turn off after the AP is ready. This button is not available if the selected AP doesn't support suppression mode.
Select an AP and click this button to disable the AP's LED suppression mode. The AP LEDs stay lit after the AP is ready. This button is not available if the selected AP doesn't support suppression mode.
Select an AP and click this button to run the locator feature. The AP's Locator LED will start to blink for 10 minutes by default. It will show the actual location of the AP between several devices on the network.
LABELDESCRIPTION
# This field is a sequential value, and it is not associated with any entry.
Status This field displays the status of AP.• O n l i n e A l l• O n l i n e• Conflict• Non Support• U p d a t i n g• Offline All• Offline• Offline for Firmware Update• U p d a t e• U n - M g m t
DescriptionThis field displays the AP's description, which you can configure by selecting the AP's entry and clicking the Edit button.
CPU Usage This field displays the CPU Usage of the AP.
IP Address This field displays the IP address of the AP.
MAC Address This field displays the MAC address of the AP.
Station 2.4GThis field displays the number of 2.4G wireless clients connected to the AP.
Station 5G This field displays the number of 5G wireless clients connected to the AP.
Recent Online TimeThis displays the most recent time the AP came on-line. N/A displays if the AP has not come on-line since the Zyxel Device last started up.
LED Status This displays the AP LED status.N/A displays if the AP does not support LED suppression mode and/or have a locator LED to show the actual location of the AP.A gray LED icon signifies that the AP LED suppression mode is enabled. All the LEDs of the AP will turn off after the AP is ready.A green LED icon signifies that the AP LED suppression mode is disabled and the AP LEDs stay lit after the AP is ready.A sun icon signifies that the AP's locator LED is blinking.A circle signifies that the AP's locator LED is extinguished.
ModelThis field displays the AP's hardware model information. It displays N/A (not applicable) only when the AP disconnects from the Zyxel Device and the information is unavailable as a result.
ApplyClick Apply to save your changes back to the Zyxel Device.
RefreshClick Refresh to update the AP list.

8.3.1.1 Edit AP List

Select an AP and click the Edit button in the Configuration > Wireless > AP Management table to display this screen.

Figure 167 Configuration > Wireless > AP Management > Mgmt. AP List > Edit AP List
Edit AP List Create New Object Configuration MAC: BC/CF4F57.02.CF Model: WAX50D Site: S1YSL42P50H1 Description: AP-BC/F4FBT22CF Group settings: default System Name: Location: Roaming Group: Load Balancing Group1 : Load Balancing Group2 : Radio 1 Setting Override Group Radio Setting AP Mode AP Mode CHON Mode Post AP TV Tercoster AP Radio 1 AP Profile Default (7) Override Group Output Power Setting Output Power: 30 dBm (P×3) (1) Override Group SSD Setting Radio 2 Setting Override Group Radio Setting AP Mode AP Mode CHON Mode Post AP TV Tercoster AP Radio 2 AP Profile Default (7) Override Group Output Power Setting Output Power: 30 dBm (P×3) (1) Override Group SSD Setting Radio 2 Setting Override Group Radio Setting AP Mode AP Mode CHON Mode Post AP TV Tercoster AP Radio 2 AP Profile Default (7) Override Group Output Power Setting Output Power: 30 dBm (P×3) (1) Override Group SSD Setting IP Setting Force Overshrte IP Setting Gef Automatically Use the TCP Address IP address: Subnet) block: Other items: DNS Serial IP Address: VLAN Settings Override Group VLAN Setting Force Overshrte VLAN Config Management VLAN ID: [1=60H] Air traffic VLAN: (1) Storm Control Setting Broadcast Storm Control Multicast Storm Control Rogue AP Detection Setting Override Group Rogue AP Detection Setting (1) Escape Rogue AP Detection Antenna Setting Wall Ceiling Power Setting Force override the power mode to full power. Note: Only enable this when you are using a passive Pot injector which is not IGBT 802.3at/ot compliant. Abnormal reboots will happen in case of insufficient power voltage. Locator LED Configuration Yes On Available Automatically Extinguish After: 10 (1~60 minutes) OK Cancel

Each field is described in the following table.

Table 85 Configuration > Wireless > AP Management > Mgmt. AP List > Edit AP List

LABEL DESCRIPTION
Create new ObjectUse this menu to create a new Radio Profile object to associate with this AP.
MAC This displays theMAC address of the selected AP.
ModelThis field displays the AP's hardware model information. It displays N/A (not applicable) only when the AP disconnects from the Zyxel Device and the information is unavailable as a result.
S/N This displays the serial number of the selected AP.
DescriptionEnter a description for this AP. You can use up to 31 characters, spaces and underscores allowed.
Group Setting Select on AP group to which you want this AP to belong.
System NameEnter a name to identify the AP on a network. This is usually the AP's fully qualified domain name.
Location Specify the name of the place where the AP is located.
Roaming GroupSpecify the name of the roaming group to which the AP belongs. You can use up to 31 alphanumeric and @# characters. Dashes and underscores are also allowed. The name should start with a letter or digit.The 802.11k neighbor list a client requests from the AP is generated according to the roaming group and RCPI (Received Channel Power Indicator) value of its neighbor APs.When a client wants to roam from the current AP to another, other APs in the same roaming group or not in a roaming group will be candidates for roaming. Neighbor APs in a different roaming group will be excluded from the 802.11k neighbor lists even when the neighbor AP has the best signal strength.If the AP's roaming group is not configured, any neighbor APs can be candidates for roaming.
Load Balancing Group 1/2Load balancing is only applied to APs within the same group. If a load balancing group is not assigned to an AP, it will belong to a default group.Each AP can belong to up to two groups.
Radio 1/2 Setting
Override Group Radio SettingSelect this option to overwrite the AP radio settings with the settings you configure here.
OP Mode Select the operating mode for radio 1 or radio 2.AP Mode means the AP can receive connections from wireless clients and pass their data traffic through to the Zyxel Device to be managed (or subsequently passed on to an upstream gateway for managing).MON Mode means the AP monitors the broadcast area for other APs, then passes their information on to the Zyxel Device where it can be determined if those APs are friendly or rogue. If an AP is set to this mode it cannot receive connections from wireless clients.Root AP means the radio acts as an AP and also supports the wireless connections with other APs (in repeater mode) to form a ZyMesh to extend its wireless network.Repeater AP means the radio can establish a wireless connection with other APs (in either root AP or repeater mode).Note: To prevent bridge loops, do NOT set both radios on a managed AP to Repeater AP mode.Note: The root AP and repeater AP(s) in a ZyMesh must use the same country code and AP radio profile settings in order to communicate with each other.Note: Ensure you restart the managed AP after you change its operating mode.
Radio 1/2 AP ProfileSelect an AP profile from the list. If no profile exists, you can create a new one through the Create new Object menu.
Radio 1/2 ProfileSelect a monitor profile from the list. If no profile exists, you can create a new one through the Create new Object menu.
Radio 1/2 ZyMesh ProfileThis field is available only when the radio is in Root AP or Repeater AP mode.Select the ZyMesh profile the radio uses to connect to a root AP or repeater.
Enable Wireless BridgingThis field is available only when the radio is in Repeater AP mode.Select this option to enable wireless bridging on the radio.The managed AP must support LAN provision and the radio should be in repeater mode.VLAN and bridge interfaces are created automatically according to the LAN port's VLAN settings. When wireless bridging is enabled, the managed repeater AP can still transmit data through its Ethernet port(s) after the ZyMesh link is up. Be careful to avoid bridge loops.The managed APs in the same ZyMesh must use the same static VLAN ID.
Override Group Output Power SettingSelect this option to overwrite the AP output power setting with the setting you configure here.
Output Power Set the output power of the AP.
Override Group SSID SettingSelect this option to overwrite the AP SSID profile setting with the setting you configure here.This section allows you to associate an SSID profile with the radio.
EditSelect an SSID and click this button to reassign it. The selected SSID becomes editable immediately upon clicking.
#This is the index number of the SSID profile. You can associate up to eight SSID profiles with an AP radio.
SSID Profile Indicates which SSID profile is associated with this radio profile.
IP Setting
Force Overwrite IP SettingSelect this to have the Zyxel Device change the AP's IP address setting to match the configuration in this screen.
Get AutomaticallySelect this to have the AP act as a DHCP client and automatically get the IP address, subnet mask, and gateway address from a DHCP server.
Use Fixed IP AddressSelect this if you want to specify the IP address, subnet mask, gateway and DNS server address manually.
IP Address Enter the IPaddress for the AP.
Subnet MaskEnter the subnet mask of the AP in dot decimal notation. The subnet mask indicates what part of the IP address is the same for all devices in the network.
GatewayEnter the IP address of the gateway. The AP sends packets to the gateway when it does not know how to route the packet to its destination. The gateway should be on the same network as the AP.
DNS Server IP AddressEnter the IP address of the DNS server.
VLAN Settings
Override Group VLAN SettingSelect this option to overwrite the AP VLAN setting with the setting you configure here.
Force Overwrite VLAN ConfigSelect this to have the Zyxel Device change the AP's management VLAN to match the configuration in this screen.
Management VLAN IDEnter a VLAN ID for this AP.
As Native VLANSelect this option to treat this VLAN ID as a VLAN created on the Zyxel Device and not one assigned to it from outside the network.
Storm Control Setting
Broadcast Storm ControlEnabling this will drop ingress broadcast traffic in the physical Ethernet port if it exceeds the maximum traffic rate. The maximum traffic rate can be changed using the CLI (see CLI Reference Guide).
Multicast Storm ControlEnabling this will drop ingress multicast traffic in the physical Ethernet port if it exceeds the maximum traffic rate. The maximum traffic rate can be changed using the CLI (see CLI Reference Guide)
Rogue AP Detection Setting
Override Group Rogue AP Detection SettingSelect this option to overwrite the AP Rogue Detection Settings with the settings you configure here
Enable Rogue AP DetectionSelect this option to detect Rogue APs in the network.
Antenna SettingThis section is available only when the AP has an antenna switch. The screen varies depending on whether the AP has a physical antenna switch or allows you to change antenna orientation settings on a per-radio basis or on a per-AP basis.
Wall/ CeilingThis allows you to adjust coverage depending on the antenna orientation of the AP's radios for better coverage.Select Wall if you mount the AP to a wall. Select Ceiling if the AP is mounted on a ceiling. You can switch from Wall to Ceiling if there are still wireless dead zones, and vice versa.
LED Suppression Mode ConfigurationThis section is available only when the AP supports LED suppression mode.
Suppression OnSelect this option to enable the AP's LED suppression mode. All the LEDs of the AP will turn off after the AP is ready.If the check box is unchecked, it means the LEDs will stay lit after the AP is ready.
Power SettingEnableForce override the power mode to full power if you are using a PoE injector that does not support PoE negotiation. Otherwise, the AP cannot draw full power from the power sourcing equipment. Enable this power mode to improve the AP's performance in this situation.Note: Ensure that the power sourcing equipment can supply enough power to the AP to avoid abnormal system reboots.Note: Only enable this if you are using a passive PoE injector that is not IEEE 802.3at/bt compliant but can still provide full power.
Locator LED ConfigurationThis section is available only when the AP has a locator LED.
Turn On/ Turn OffWhen the locator LED is off, click theTurn Onbutton to activate the locator function. It will show the actual location of the AP between several devices in the network.If the locator LED is blinking, click theTurn Offbutton to stop the locator LED from blinking immediately.
Automatically Extinguish AfterEnter a time interval between 1 and 60 minutes to stop the locator LED from blinking. The locator LED will start to blink for the number of minutes set here.If you make changes to the time default setting, it will be stored as the default when the AP restarts.
Reset AP ConfigurationThis section is available only when the AP is online.
Apply Factory DefaultClick the button to reset all of the AP settings to the factory defaults.
OKClickOKto save your changes back to the Zyxel Device.
CancelClickCancelto close the window with changes unsaved.

8.3.2 AP Policy

Use this screen to configure the AP controller's IP address on the managed APs and determine the action the managed APs take if the current AP controller fails. Click Configuration > Wireless > AP Management > AP Policy to access this screen.

Figure 168 Configuration > Wireless > AP Management > AP Policy
Mgmt. AP List AP Policy AP Group Firmware General Settings ✓ Force Override AC IP Config on AP Override Type: ● Auto ○ Manual Primary Controller: Secondary Controller: ✓ Fall back to Primary Controller when possible Fall Back Check Interval: 30 (30-86400 seconds) Firmware Updating Updating Type: ● CAPWAP ○ FTP Apply Reset

Each field is described in the following table.

Table 86 Configuration > Wireless > AP Management > AP Policy

LABEL DESCRIPTION
Force Override AC IP Config on APSelect this to have the Zyxel Device change the AP controller's IP address on the managed AP(s) to match the configuration in this screen.
Override TypeSelect Auto to have the managed AP(s) automatically send broadcast packets to find any other available AP controllers.Select Manual to replace the AP controller's IP address configured on the managed AP(s) with the one(s) you specified below.
Primary ControllerSpecify the IP address of the primary AP controller if you set Override Type to Manual.
Secondary ControllerSpecify the IP address of the secondary AP controller if you set Override Type to Manual.
Fall back to Primary Controller when possibleSelect this option to have the managed AP(s) change back to associate with the primary AP controller as soon as the primary AP controller is available.
Fall Back Check IntervalSet how often the managed AP(s) check whether the primary AP controller is available.
Firmware Updating
Updating Type Specifyhow you want the Zyxel Device to upgrade AP firmware.Select CAPWAP to have the Zyxel Device use CAPWAP (Control and Provisioning of Wireless Access Points protocol) to automatically update firmware on the managed APs.Select FTP to allow the managed APs to download the latest firmware from the Zyxel Device using FTP.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

8.3.3 AP Group

Use this screen to configure AP groups, which define the radio, port, VLAN and load balancing settings and apply the settings to all APs in the group. An AP can belong to one AP group at a time. Click Configuration > Wireless > AP Management > AP Group to access this screen.

Figure 169 Configuration > Wireless > AP Management > AP Group
Mgmt. AP List AP Policy AP Group Firmware Group setting Default Group: default Group Summary Add Edit Remove DCS Now Group Name Member Count 1 default 0 2 Unclassified 0 Page 1 of 1 Show 50 Items Displaying 1 - 2 of 2 Apply Reset

Each field is described in the following table.

Table 87 Configuration > Wireless > AP Management > AP Group

LABEL DESCRIPTION
Group Setting
Default Group Select a group that is used as the default group.Any AP that is not configured to associate with a specific AP group belongs to the default group automatically.
Group Summary
Add Click this button to create a new AP group.
Edit Select an entry and click this button to edit its properties.
RemoveSelect an entry and click this button to remove it from the list.Note: You cannot remove a group with which an AP is associated.
DCS NowSelect one or multiple groups and click this button to use DCS (Dynamic Channel Selection) to allow the APs in the group(s) to automatically find a less-used channel in an environment where there are many APs and there may be interference.Note: You should have enabled DCS in the applied AP radio profile before the APs can use DCS.Note: DCS is not supported on the radio which is working in repeater AP mode.
# This is the index number of the group in the list.
Group Name This is the name of the group.
Member Count This is the total number of APs which belong to this group.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

8.3.3.1 Add/Edit AP Group

Click Add or select an AP group and click the Edit button in the Configuration > Wireless > AP Management > AP Group table to display this screen.

Figure 170 Configuration > Wireless > AP Management > AP Group > Add/Edit
Edit AP Group Profile default General Settings Group Name: default Description: (Optional) Location: (Optional) Radio 1 Setting OP Mode AP Mode MON Mode Root AP Repeater AP Radio 1 AP Profile: default Radio 1 ZyMesh Profile: ZyMesh_AP Enable Wireless Bridging Output Power: 30 dBm (0-30) Edit ISO Profile 1 default 2 disable 3 disable 4 disable 5 disable 6 disable 7 disable 8 disable Radio 2 Setting OP Mode AP Mode MON Mode Root AP Repeater AP Radio 2 AP Profile: default2 Output Power: 30 dBm (0-30) Edit ISO Profile 1 default 2 disable 3 disable 4 disable 5 disable 6 disable 7 disable 8 disable VLAN Settings Force Overwrite VLAN Config Management VLAN C: 1 (1-40*4) As Native VLAN Port Settings Model Specific Settings: nwa5301-n Port Setting Edit Activate Inactivate Status Port PVD 1 uplink n/a 2 lon1 1 3 lon2 1 4 lon3 1 Page 1 of 1 Show 50 Items Displaying 1 - 4 of 4 VLAN Configuration Add Edit Remove Activate Inactivate Name VCI Member 1 Vlan0 1 lon1jan2ian3 Page 1 of 1 Show 50 Items Displaying 1 - 1 of 1 Rogue AP Detection Setting Enable Rogue AP Detection AP List Available *** member **** default *** AP: 5CCF4FB792CF(BC:CF4F:B7:52:CF) OK Cancel Oventide Member AP setting

Each field is described in the following table.

Table 88 Configuration > Wireless > AP Management > AP Group > Add/Edit

LABEL DESCRIPTION
General Settings
Group NameEnter a name for this group. You can use up to 31 alphanumeric characters. Dashes and underscores are also allowed. The name should start with a letter.
DescriptionEnter a description for this group. You can use up to 31 characters, spaces and underscores allowed.
Location Specify the name of the place where the AP group is located.
Radio 1/2 Setting
OP Mode Select the operating mode for radio 1 or radio 2.AP Mode means the AP can receive connections from wireless clients and pass their data traffic through to the Zyxel Device to be managed (or subsequently passed on to an upstream gateway for managing).MON Mode means the AP monitors the broadcast area for other APs, then passes their information on to the Zyxel Device where it can be determined if those APs are friendly or rogue. If an AP is set to this mode it cannot receive connections from wireless clients.Root AP means the radio acts as an AP and also supports the wireless connections with other APs (in repeater mode) to form a ZyMesh to extend its wireless network.Repeater AP means the radio can establish a wireless connection with other APs (in either root AP or repeater mode).Note: To prevent bridge loops, do NOT set both radios on a managed AP to Repeater AP mode.Note: The root AP and repeater AP(s) in a ZyMesh must use the same country code and AP radio profile settings in order to communicate with each other.Note: Ensure you restart the managed AP after you change its operating mode.
Radio 1/2 AP ProfileSelect an AP profile from the list. If no profile exists, you can create a new one through the Create new Object menu.
Radio 1/2 ProfileSelect a monitor profile from the list. If no profile exists, you can create a new one through the Create new Object menu.
Radio 1/2 ZyMesh ProfileThis field is available only when the radio is in Root AP or Repeater AP mode.Select the ZyMesh profile the radio uses to connect to a root AP or repeater.
Enable Wireless BridgingThis field is available only when the radio is in Repeater AP mode.Select this option to enable wireless bridging on the radio.The managed AP must support LAN provision and the radio should be in repeater mode.VLAN and bridge interfaces are created automatically according to the LAN port's VLAN settings. When wireless bridging is enabled, the managed repeater AP can still transmit data through its Ethernet port(s) after the ZyMesh link is up. Be careful to avoid bridge loops.The managed APs in the same ZyMesh must use the same static VLAN ID.
Output Power Set the maximum output power of the AP.If there is a high density of APs in an area, decrease the output power of the managed AP to reduce interference with other APs.Note: Reducing the output power also reduces the Zyxel Device's effective broadcast radius.
EditSelect an SSID and click this button to reassign it. The selected SSID becomes editable immediately upon clicking.
#This is the index number of the SSID profile. You can associate up to eight SSID profiles with an AP radio.
SSID Profile Indicates which SSID profile is associated with this radio profile.
VLAN Settings
Force Overwrite VLAN ConfigSelect this to have the Zyxel Device change the AP's management VLAN to match the configuration in this screen.
Management VLAN IDEnter a VLAN ID for this AP.
As Native VLANSelect this option to treat this VLAN ID as a VLAN created on the Zyxel Device and not one assigned to it from outside the network.
Port Settings
Model Specific SettingSelect the model of the managed AP to display the model-specific port and VLAN settings in the tables below.
Port Setting You can activate or deactivate a non-uplink port.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
Activate/InactivateTo turn on an entry, select it and click Activate. To turn off an entry, select it and click Inactivate.
# This is the port's index number in this list.
Status This displays whether or not the port is activated.
PortThis shows the name of the physical Ethernet port on the managed AP.
PVID This shows the port's PVID.A PVID (Port VLAN ID) is a tag that adds to incoming untagged frames received on a port so that the frames are forwarded to the VLAN group that the tag defines.
VLAN ConfigurationUse Add to create a new VLAN Configuration. Select a VLAN Configuration first to use the Edit, Remove, Activate and Inactivate buttons.
# This is the VLAN's index number in this list.
Status This displays whether or not the VLAN is activated.
Name This shows the name of the VLAN.
VID This shows the VLAN ID number.
Member This field displays the Ethernet port(s) that is a member of this VLAN.
Load Balancing Setting
Enable Load BalancingSelect this to enable load balancing on the Zyxel Device.Use this section to configure wireless network traffic load balancing between the managed APs in this group.Note: Load balancing is not supported on the radio which is working in root AP or repeater AP mode.
Mode Select a mode by which load balancing is carried out.
Radio 1/2 Max Station NumberEnter the threshold number of stations at which an AP begins load balancing its connections.
Disassociate station when overloadedThis function is enabled by default and the disassociation priority is always Signal Strength when you set Mode to By Station Number.Select this option to disassociate wireless clients connected to the AP when it becomes overloaded. If you do not enable this option, then the AP simply delays the connection until it can afford the bandwidth it requires, or it transfers the connection to another AP within its broadcast radius.The disassociation priority is determined automatically by the Zyxel Device and is as follows:Idle Timeout - Devices that have been idle the longest will be disassociated first. If none of the connected devices are idle, then the priority shifts to Signal Strength.Signal Strength - Devices with the weakest signal strength will be disassociated first.Note: If you enable this function, you should ensure that there are multiple APs within the broadcast radius that can accept any rejected or kicked wireless clients; otherwise, a wireless client attempting to connect to an overloaded AP will be kicked continuously and never be allowed to connect.
Radio 1/2 Traffic LevelSelect the threshold traffic level at which the AP begins load balancing its connections (Low, Medium, High).The maximum bandwidth allowed for each level is:Low - 11 Mbps,Medium - 23 MbpsHigh - 35M bps
Rogue AP Detection Setting
Enable Rogue AP DetectionSelect this option to detect Rogue APs in the network.
AP List
AvailableThis lists the APs that do not belong to this group. Select the APs that you want to add to the group you are editing, and click the right arrow button to add them.
MemberThis lists the APs that belong to this group. Select any APs that you want to remove from the group, and click the left arrow button to remove them.
AP List
AvailableThis lists the APs that do not belong to this group. Select the APs that you want to add to the group you are editing, and click the right arrow button to add them.
MemberThis lists the APs that belong to this group. Select any APs that you want to remove from the group, and click the left arrow button to remove them.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to close the window with changes unsaved.
Override Member AP SettingClick this button to overwrite the settings of all managed APs in this group with the settings you configure here. All Override Group check boxes on the AP Management > Mgmt. AP List > Edit AP List screen for the APs in this group will be deselected.

8.3.4 Firmware

The Zyxel Device stores an AP firmware in order to manage supported APs. This screen allows the Zyxel Device to check for and download new AP firmware when it becomes available on the firmware server. All APs managed by the Zyxel Device must have the same firmware version as the AP firmware on the Zyxel Device.

When an AP connects to the Zyxel Device wireless controller, the Zyxel Device will check if the AP has the same firmware version as the AP firmware on the Zyxel Device. If yes, then the Zyxel Device can manage it. If no, then the AP must upgrade (or downgrade) its firmware to be the same version as the AP firmware on the Zyxel Device (and reboot).

The Zyxel Device should always have the latest AP firmware so that:

  • APs don't have to downgrade firmware in order to be managed
  • All new APs are supported.

Use Check to see if the Zyxel Device has the latest AP firmware. Use Apply to have the Zyxel Device download the latest AP firmware (see More Details for more information on the firmware) from the firmware server. If the Zyxel Device does not have enough space for the latest AP firmware, then the Zyxel Device will delete an existing firmware that no AP is using before downloading the new AP firmware.

Click Configuration > Wireless > AP Management > Firmware to access this screen.

Figure 171 Configuration > Wireless > AP Management > Firmware
Mgmt. AP List AP Policy AP Group Firmware AP Firmware Runtime Firmware: V5.00 Patch 4 Available Firmware: N/A Last Check Success: N/A Check Apply AP Firmware Apply Controller will only download and keep needed AP firmware. Installing new AP may require additional time to download firmware package. It is required to maintain internet access during the firmware upgrade process. Model Runtime Firmware 1 WAC6502D-E -/V5.00(AASD.4) 2 WAC6502D-S -/V5.00(AASE.4) 3 WAC6503D-S -/V5.00(AASF.4) 4 WAC6553D-E -/V5.00(AASG.4) 5 WAC5302D-S -/V5.00(ABFH.4) 6 NWA5301-NJ -/V5.00(AANB.4) 7 NWA5121-NI Local / V5.00(AAID.4) 8 NWA5123-NI Local / V5.00(AAHY.4) 9 NWA5121-N Local / V5.00(AAIF.4) 10 NWA516ON -/V5.00(AA5.4) 11 NWA556O-N -/V5.00(UJE.4) 12 NWA555O-N -/V5.00(UJD.4) Refresh

Each field is described in the following table.

Table 89 Configuration > Wireless > AP Management > Firmware

LABEL DESCRIPTION
AP Firmware
Runtime FirmwareThis displays the current AP firmware version on the Zyxel Device. The Zyxel Device must have the latest AP firmware to manage all supported APs.
Available FirmwareThis field displays if there is a later AP firmware version available on the firmware server. It displays N/A if the Zyxel Device cannot connect with the firmware server. Check that the Zyxel Device has Internet access if N/A displays and then click the Check button below.If a newer Zyxel Device AP firmware is available, its version number and a More Details icon displays here.
Available Firmware: V5.00 Patch 4 -5.10(.2) [372c] More Details
Last Check SuccessThis displays the date and time the last check for new firmware was made and whether the check is in progress (checking), was successful (success), or has failed (fail).
CheckClick this button to have the Zyxel Device display the latest AP firmware version available on the firmware server.
Apply AP FirmwareDue to space limitations, the Zyxel Device only downloads and keeps AP firmware for APs it is currently managing. If you connect a new AP to the Zyxel Device, the Zyxel Device may need to download a new AP firmware. Please wait while downloading new firmware as the speed depends on your Internet connection speed. Make sure to maintain the Internet connection while downloading new firmware.
ApplyClick this to download newer Available Firmware from the firmware server and update the Runtime Firmware version.
# This is an index number of a managed AP.
Model This displays the name of all manageable AP models.
Runtime FirmwareThis displays the firmware version that the managed AP must have in order to be managed by the Zyxel Device. Firmware for APs that the Zyxel Device already has displays in bold; firmware that the Zyxel Device doesn't have or is still downloading is grayed out. Firmware that is in the download queue will show To be downloaded.
Refresh Click this to update the model firmware table.

8.4 Rogue AP

Use this screen to assign APs either to the rogue AP list or the friendly AP list. A rogue AP is a wireless access point operating in a network's coverage area that is not under the control of the network administrator, and which can potentially open up holes in a network's security.

Click Configuration > Wireless > Rogue AP to access this screen.

Figure 172 Configuration > Wireless > Rogue AP
Rogue/Friendly AP List Suspected Rogue AP Classification Rule Weak Security (Open,WEP,WPA-PSK) Un-managed AP Hidden SSID SSID Keyword Add Edit Remove SSID Keyword Rogue/Friendly AP List Add Edit Remove Containment Dis-Containment Conta... Role MAC Address Description Page 0 of 0 Show 50 items No data to display Rogue AP List Importing/Exporting File Path: Select a file path for Rogue AP List Browse... Importing Exporting Friendly AP List Importing/Exporting File Path: Select a file path for Friendly AP L Browse... Importing Exporting Monitor Mode Settings Enable Rogue AP Containment Apply Reset

Each field is described in the following table.

Table 90 Configuration > Wireless > Rogue AP

LABEL DESCRIPTION
Suspected Rogue AP Classification RuleClick the check boxes (Weak Security (Open, WEP, WPA-PSK), Un-managed AP, Hidden SSID, SSID Keyword) of the characteristics an AP should have for the Zyxel Device to rule it as a rogue AP.
Add Click this to add an SSID Keyword.
Edit Select an SSID Keyword and click this button to modify it.
RemoveSelect an existing SSID keyword and click this button to delete it.
# This is the SSID Keyword's index number in this list.
SSID Keyword This field displays the SSID Keyword.
Rogue/Friendly AP List
AddClick this button to add an AP to the list and assign it either friendly or rogue status.
Edit Select an AP in the list to edit and reassign its status.
Remove Select an AP in the list to remove.
Containment Click this button to quarantine the selected AP.A quarantined AP cannot grant access to any network services. Any stations that attempt to connect to a quarantined AP are disconnected automatically.
Dis-ContainmentClick this button to take the selected AP out of quarantine.An unquarantined AP has normal access to the network.
#This field is a sequential value, and it is not associated with any interface.
ContainmentThis field indicates the selected AP's containment status.
RoleThis field indicates whether the selected AP is a rogue-ap or a friendly-ap. To change the AP's role, click the Edit button.
MAC Address This field indicates the AP's radio MAC address.
DescriptionThis field displays the AP's description. You can modify this by clicking the Edit button.
Rogue/Friendly AP List Importing/ExportingThese controls allow you to export the current list of rogue and friendly APs or import existing lists.
File Path / Browse / ImportingEnter the file name and path of the list you want to import or click the Browse button to locate it. Once the File Path field has been populated, click Importing to bring the list into the Zyxel Device.
ExportingClick this button to export the current list of either rogue APs or friendly APS.
Monitor Mode Settings
Enable Rogue AP ContainmentSelect this to enable rogue AP containment.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

8.4.1 Add/Edit Rogue/Friendly List

Select an AP and click the Edit button in the Configuration > Wireless > Rogue AP table to display this screen.

Figure 173 Configuration > Wireless > Rogue AP > Add/Edit Rogue/Friendly
Edit Rogue/Friendly AP List MAC: Description: Role: (Optonal) Rogue AP Friendly AP OK Cancel

Each field is described in the following table.

Table 91 Configuration > Wireless > Rogue AP > Add/Edit Rogue/Friendly

LABEL DESCRIPTION
MACEnter the MAC address of the AP you want to add to the list. A MAC address is a unique hardware identifier in the following hexadecimal format: xx:xx:xx:xx:xx:xx where xx is a hexadecimal number separated by colons.
DescriptionRoleEnter up to 60 characters for the AP's description. Spaces and underscores are allowed.Select either Rogue AP or Friendly AP for the AP's role.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to close the window with changes unsaved.

8.5 Auto Healing

Use this screen to enable auto healing, which allows you to extend the wireless service coverage area of the managed APs when one of the APs fails. Click Configuration > Wireless > Auto Healing to access this screen.

Figure 174 Configuration > Wireless > Auto Healing
Auto Healing Auto Healing Configuration Enable Auto Healing Save Current State Auto Healing Interval: 10 (5-30 minutes) Power Threshold: -70 dBm (-50 ~ -80) Note: When deployment is complete/changed, admin should make sure the parameters are ok, all WTP in online status and click Save Current Status button. Apply Reset

Each field is described in the following table.

Table 92 Configuration > Wireless > Auto Healing

LABEL DESCRIPTION
Enable Auto HealingSelect this option to turn on the auto healing feature.
Save Current StateClick this button to have all manged APs immediately scan their neighborhoods three times in a row and update their neighbor lists to the AP controller (Zyxel Device).
Auto Healing IntervalSet the time interval (in minutes) at which the managed APs scan their neighborhoods and report the status of neighbor APs to the AP controller (Zyxel Device).An AP is considered “failed” if the AP controller obtains the same scan result that the AP is missing from the neighbor list of other APs three times.
Power ThresholdSet the power level (in dBm) to which the neighbor APs of the failed AP increase their output power in order to extend their wireless service coverage areas.When the failed AP is working again, its neighbor APs return their output power to the original level.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

8.6 RTLS Overview

Ekahau RTLS (Real Time Location Service) tracks battery-powered Wi-Fi tags attached to APs managed by the Zyxel Device to create maps, alerts, and reports.

The Ekahau RTLS Controller is the centerpiece of the RTLS system. This server software runs on a Windows computer to track and locate Ekahau tags from Wi-Fi signal strength measurements. Use the Zyxel Device with the Ekahau RTLS system to take signal strength measurements at the APs (Integrated Approach / Blink Mode).

The following example shows the Ekahau RTLS Integrated Approach (Blink Mode).

1 The Wi-Fi tag sends blink packets at specified intervals (or triggered by something like motion or button presses).
2 The APs pick up the blink packets, measure the signal strength, and send it to the Zyxel Device.
3 The Zyxel Device forwards the signal measurements to the Ekahau RTLS Controller.
4 The Ekahau RTLS Controller calculates the tag positions.

Figure 175 RTLS Example
ZYXEL USGFLEX700-GB0101F - RTLS Overview - 1

flowchart
graph LR
    A["Computer"] -->|1| B["Block 2"]
    B -->|3| C["Server 1"]
    B -->|4| D["Server 2"]

8.6.1 What You Can Do in this Chapter

Use the RTLS screen (Section 8.6.3 on page 225) to use the managed APs as part of an Ekahau RTLS (Real Time Location Service) to track the location of Ekahau Wi-Fi tags.

8.6.2 Before You Begin

You need:

  • At least three APs managed by the Zyxel Device (the more APs the better since it increases the amount of information the Ekahau RTLS Controller has for calculating the location of the tags)
    • IP addresses for the Ekahau Wi-Fi tags
    • A dedicated RTLS SSID is recommended

  • Ekahau RTLS Controller in blink mode with TZSP Updater enabled

  • Security policies to allow RTLS traffic if the Zyxel Device security policy control is enabled or the Ekahau RTLS Controller is behind a firewall.

For example, if the Ekahau RTLS Controller is behind a firewall, open ports 8550, 8553, and 8569 to allow traffic the APs send to reach the Ekahau RTLS Controller.

The following table lists default port numbers and types of packets RTLS uses.

Table 93 RTLS Traffic Port Numbers

PORT NUMBER TYPE DESCRIPTION
8548 TCP Ekahau T201 location update.
8549 UDP Ekahau T201 location update.
8550TCPEkahau T201 tag maintenance protocol and Ekahau RTLS Controller user interface.
8552 UDP Ekahau Location Protocol
8553 UDP Ekahau Maintenance Protocol
8554 UDP Ekahau T301 firmware update.
8560 TCP Ekahau Vision web interface
8562 UDP Ekahau T301W firmware update.
8569 UDP Ekahau TZSP Listener Port

8.6.3 Configuring RTLS

Click Configuration > Wireless > RTLS to open this screen. Use this screen to turn RTLS (Real Time Location System) on or off and specify the IP address and server port of the Ekahau RTLS Controller.

Figure 176 Configuration > Wireless > RTLS
Real Time Location System Ekahau Location Engine Enable IP Address: Server Port: 8569 (1-65535) Apply Reset

The following table describes the labels in this screen.

Table 94 Configuration > Wireless > RTLS

LABEL DESCRIPTION
EnableSelect this to use Wi-Fi to track the location of Ekahau Wi-Fi tags.
IP Address Specifythe IP address of the Ekahau RTLS Controller.
Server Port Specifythe server port number of the Ekahau RTLS Controller.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

8.7 Technical Reference

The following section contains additional technical information about wireless features.

8.7.1 Dynamic Channel Selection

When numerous APs broadcast within a given area, they introduce the possibility of heightened radio interference, especially if some or all of them are broadcasting on the same radio channel. If the interference becomes too great, then the network administrator must open his AP configuration options and manually change the channel to one that no other AP is using (or at least a channel that has a lower level of interference) in order to give the connected stations a minimum degree of interference. Dynamic channel selection frees the network administrator from this task by letting the AP do it automatically. The AP can scan the area around it looking for the channel with the least amount of interference.

In the 2.4 GHz spectrum, each channel from 1 to 13 is broken up into discrete 22 MHz segments that are spaced 5 MHz apart. Channel 1 is centered on 2.412 GHz while channel 13 is centered on 2.472 GHz.

Figure 177 An Example Three-Channel Deployment
ZYXEL USGFLEX700-GB0101F - Dynamic Channel Selection - 1

radar | Value | |-------| | 1 | | 2 | | 3 | | 4 | | 5 | | 6 | | 7 | | 8 | | 9 | | 10 | | 11 | | 12 | | 13 | | 14 |

Three channels are situated in such a way as to create almost no interference with one another if used exclusively: 1, 6 and 11. When an AP broadcasts on any of these three channels, it should not interfere with neighboring APs as long as they are also limited to same trio.

Figure 178 An Example Four-Channel Deployment
ZYXEL USGFLEX700-GB0101F - Dynamic Channel Selection - 2

bubble | Label | Value | |-------|-------| | 1 | 2401 | | 2 | 2406 | | 3 | 2411 | | 4 | 2416 | | 5 | 2421 | | 6 | 2423 | | 7 | 2426 | | 8 | 2431 | | 9 | 2433 | | 10 | 2436 | | 11 | 2438 | | 12 | 2441 | | 13 | 2443 | | 14 | 2446 | | | 2448 | | | 2451 | | | 2453 | | | 2456 | | | 2458 | | | 2461 | | | 2463 | | | 2468 | | | 2473 | | | 2478 | | | 2483 | | | 2495 |

However, some regions require the use of other channels and often use a safety scheme with the following four channels: 1, 4, 7 and 11. While they are situated sufficiently close to both each other and the three so-called "safe" channels (1,6 and 11) that interference becomes inevitable, the severity of it is dependent upon other factors: proximity to the affected AP, signal strength, activity, and so on.

Finally, there is an alternative four channel scheme for ETSI, consisting of channels 1, 5, 9, 13. This offers significantly less overlap that the other one.

Figure 179 An Alternative Four-Channel Deployment
ZYXEL USGFLEX700-GB0101F - Dynamic Channel Selection - 3

radar | Label | Value | |-------|-------| | 1 | 2401 | | 2 | 2406 | | 3 | 2411 | | 4 | 2416 | | 5 | 2421 | | 6 | 2423 | | 7 | 2426 | | 8 | 2428 | | 9 | 2431 | | 10 | 2433 | | 11 | 2436 | | 12 | 2438 | | 13 | 2441 | | | 2443 | | | 2446 | | | 2448 | | | 2451 | | | 2453 | | | 2456 | | | 2458 | | | 2461 | | | 2463 | | | 2468 | | | 2473 | | | 2478 | | | 2483 | | | 2495 |

8.7.2 Load Balancing

Because there is a hard upper limit on an AP's wireless bandwidth, load balancing can be crucial in areas crowded with wireless users. Rather than let every user connect and subsequently dilute the available bandwidth to the point where each connecting device receives a meager trickle, the load balanced AP instead limits the incoming connections as a means to maintain bandwidth integrity.

There are two kinds of wireless load balancing available on the Zyxel Device:

Load balancing by station number limits the number of devices allowed to connect to your AP. If you know exactly how many stations you want to let connect, choose this option.

For example, if your company's graphic design team has their own AP and they have 10 computers, you can load balance for 10. Later, if someone from the sales department visits the graphic design team's offices for a meeting and he tries to access the network, his computer's connection is delayed, giving it the opportunity to connect to a different, neighboring AP. If he still connects to the AP regardless of the delay, then the AP may boot other people who are already connected in order to associate with the new connection.

Load balancing by traffic level limits the number of connections to the AP based on maximum bandwidth available. If you are uncertain as to the exact number of wireless connections you will have then choose this option. By setting a maximum bandwidth cap, you allow any number of devices to connect as long as their total bandwidth usage does not exceed the configured bandwidth cap associated with this setting. Once the cap is hit, any new connections are rejected or delayed provided that there are other APs in range.

Imagine a coffee shop in a crowded business district that offers free wireless connectivity to its customers. The coffee shop owner can't possibly know how many connections his AP will have at any given moment. As such, he decides to put a limit on the bandwidth that is available to his customers but not on the actual number of connections he allows. This means anyone can connect to his wireless network as long as the AP has the bandwidth to spare. If too many people connect and the AP hits its bandwidth cap then all new connections must basically wait for their turn or get shunted to the nearest identical AP.

CHAPTER 9 Interfaces

9.1 Interface Overview

Use the Interface screens to configure the Zyxel Device's interfaces. You can also create interfaces on top of other interfaces.

  • Ports are the physical ports to which you connect cables.
  • Interfaces are used within the system operationally. You use them in configuring various features. An interface also describes a network that is directly connected to the Zyxel Device. For example, You connect the LAN network to the LAN interface.
  • Zones are groups of interfaces used to ease security policy configuration.

9.1.1 What You Can Do in this Chapter

  • Use the Port Role screen (Section 9.2 on page 233) to create port groups and to assign physical ports and port groups to Ethernet interfaces.
  • Use the Port Configuration screen (Section 9.3 on page 234) to configure Zyxel Device port settings.
  • Use the Ethernet screens (Section 9.4 on page 235) to configure the Ethernet interfaces. Ethernet interfaces are the foundation for defining other interfaces and network policies. RIP and OSPF are also configured in these interfaces.
  • Use the PPP screens (Section 9.5 on page 258) for PPPoE, PPTP or L2TP Internet connections.
  • Use the Cellular screens (Section 9.6 on page 265) to configure settings for interfaces for Internet connections through an installed mobile broadband card.
  • Use the Tunnel screens (Section 9.7 on page 274) to configure tunnel interfaces to be used in Generic Routing Encapsulation (GRE), IPv6 in IPv4, and 6to4 tunnels.
  • Use the VLAN screens (Section 9.8 on page 281) to divide the physical network into multiple logical networks. VLAN interfaces receive and send tagged frames. The Zyxel Device automatically adds or removes the tags as needed. Each VLAN can only be associated with one Ethernet interface.
  • Use the Bridge screens (Section 9.9 on page 294) to combine two or more network segments into a single network.
  • Use the VTI screens (Section 9.10 on page 308) to encrypt or decrypt IPv4 traffic from or to the interface according to the IP routing table.
  • Use the Trunk screens (Section 9.11 on page 313) to configure load balancing.

9.1.2 What You Need to Know

Interface Characteristics

Interfaces generally have the following characteristics (although not all characteristics apply to each type of interface).

  • An interface is a logical entity through which (layer-3) packets pass.
  • An interface is bound to a physical port or another interface.
  • Many interfaces can share the same physical port.
  • An interface belongs to at most one zone.
  • Many interfaces can belong to the same zone.
  • Layer-3 virtualization (IP alias, for example) is a kind of interface.

Types of Interfaces

You can create several types of interfaces in the Zyxel Device.

  • Setting interfaces to the same port role forms a port group. Port groups creates a hardware connection between physical ports at the layer-2 (data link, MAC address) level. Port groups are created when you use the Interface > Port Roles or Interface > Port Groups screen to set multiple physical ports to be part of the same interface.
  • Ethernet interfaces are the foundation for defining other interfaces and network policies. RIP and OSPF are also configured in these interfaces.
  • Tunnel interfaces send IPv4 or IPv6 packets from one network to a specific network through the Internet or a public network.
  • VLAN interfaces receive and send tagged frames. The Zyxel Device automatically adds or removes the tags as needed. Each VLAN can only be associated with one Ethernet interface.
  • Bridge interfaces create a software connection between Ethernet or VLAN interfaces at the layer-2 (data link, MAC address) level. Unlike port groups, bridge interfaces can take advantage of some security features in the Zyxel Device. You can also assign an IP address and subnet mask to the bridge.
  • PPP interfaces support Point-to-Point Protocols (PPP). ISP accounts are required for PPPoE/PPTP/L2TP interfaces.
  • Cellular interfaces are for mobile broadband WAN connections via a connected mobile broadband device.
  • Virtual interfaces provide additional routing information in the Zyxel Device. There are three types: virtual Ethernet interfaces, virtual VLAN interfaces, and virtual bridge interfaces.
  • Trunk interfaces manage load balancing between interfaces.

Port groups and trunks have a lot of characteristics that are specific to each type of interface. The other types of interfaces--Ethernet, PPP, cellular, VLAN, bridge, and virtual--have a lot of similar characteristics. These characteristics are listed in the following table and discussed in more detail below.

Table 95 Ethernet, PPP, Cellular, VLAN, Bridge, and Virtual Interface Characteristics

CHARACTERISTICSETHERNETETHERNETPPPCELLULARVLANBRIDGEVIRTUAL
Name* wan1, wan2 lan1, lan2,dmzpppxcellularxvlanxbrx**
Configurable ZoneNoNoYesYesYesYesNo
IP Address Assignment
Static IP addressYesYesYesYesYesYesYes
DHCP clientYesNoYesYesYesYesNo
Routing metricYesYesYesYesYesYesYes
Interface Parameters
Bandwidth restrictionsYes Yes Yes YesYes Yes Yes
Packet size (MTU)Yes Yes Yes YesYes Yes No
DHCP
DHCP serverNoYesNoNoYesYesNo
DHCP relayNoYesNoNoYesYesNo
Connectivity CheckYesNoYesYesYesYesNo

Note: - * The format of interface names other than the Ethernet and ppp interface names is strict. Each name consists of 2-4 letters (interface type), followed by a number (x). For most interfaces, x is limited by the maximum number of the type of interface. For VLAN interfaces, x is defined by the number you enter in the VLAN name field. For example, Ethernet interface names are wan1, wan2, lan1, lan2, dmz; VLAN interfaces are vlan0, vlan1, vlan2,...; and so on.
** - The names of virtual interfaces are derived from the interfaces on which they are created. For example, virtual interfaces created on Ethernet interface wan1 are called wan1:1, wan1:2, and so on. Virtual interfaces created on VLAN interface vlan2 are called vlan2:1, vlan2:2, and so on. You cannot specify the number after the colon(:) in the Web Configurator; it is a sequential number. You can specify the number after the colon if you use the CLI to set up a virtual interface.

Relationships Between Interfaces

In the Zyxel Device, interfaces are usually created on top of other interfaces. Only Ethernet interfaces are created directly on top of the physical ports or port groups. The relationships between interfaces are explained in the following table.

Table 96 Relationships Between Different Types of Interfaces

INTERFACE REQUIRED PORT / INTERFACE
Ethernet interface physical port
VLAN interface Ethernet interface
bridge interfaceEthernet interface*VLAN interface*
PPP interfaceEthernet interface*VLAN interface*bridge interfaceWAN1, WAN2, OPT*
virtual interface(virtual Ethernet interface)(virtual VLAN interface)(virtual bridge interface)Ethernet interface*VLAN interface*bridge interface
trunk Ethernet interfaceCellular interfaceVLAN interfacebridge interfacePPP interface

Note: * You cannot set up a PPP interface, virtual Ethernet interface or virtual VLAN interface if the underlying interface is a member of a bridge. You also cannot add an Ethernet interface or VLAN interface to a bridge if the member interface has a virtual interface or PPP interface on top of it.

IPv6 Overview

IPv6 (Internet Protocol version 6), is designed to enhance IP address size and features. The increase in IPv6 address size to 128 bits (from the 32-bit IPv4 address) allows up to 3.4 × 10^38 IP addresses.

IPv6 Addressing

An 128-bit IPv6 address is written as eight 16-bit hexadecimal blocks separated by colons (:) . This is an example IPv6 address 2001:0db8:1a2b:0015:0000:0000:1a2f:0000.

IPv6 addresses can be abbreviated in two ways:

  • Leading zeros in a block can be omitted. So 2001:0db8:1a2b:0015:0000:0000:1a2f:0000 can be written as 2001:db8:1a2b:15:0:0:1a2f:0.
  • Any number of consecutive blocks of zeros can be replaced by a double colon. A double colon can only appear once in an IPv6 address. So 2001:0db8:0000:0000:1a2f:0000:0000:0015 can be written as 2001:0db8::1a2f:0000:0000:0015, 2001:0db8:0000:0000:1a2f::0015, 2001:db8::1a2f:0:0:15 or 2001:db8:0:0:1a2f::15.

Prefix and Prefix Length

Similar to an IPv4 subnet mask, IPv6 uses an address prefix to represent the network address. An IPv6 prefix length specifies how many most significant bits (start from the left) in the address compose the network address. The prefix length is written as "/x" where x is a number. For example,

2001:db8:1a2b:15::1a2f:0/32

means that the first 32 bits (2001:db8) from the left is the network prefix.

A link-local address uniquely identifies a device on the local network (the LAN). It is similar to a "private IP address" in IPv4. You can have the same link-local address on multiple interfaces on a device. A link-local unicast address has a predefined prefix of fe80::/10. The link-local unicast address format is as follows.

Table 97 Link-local Unicast Address Format

1111 1110 10 0 Interface ID
10 bits 54 bits 64 bits

Subnet Masking

Both an IPv6 address and IPv6 subnet mask compose of 128-bit binary digits, which are divided into eight 16-bit blocks and written in hexadecimal notation. Hexadecimal uses four bits for each character (1 \~ 10, A \~ F). Each block's 16 bits are then represented by four hexadecimal characters. For example, FFFF:FFFF:FFFF:FFFF:FC00:0000:0000:0000.

Stateless Autoconfiguration

With stateless autoconfiguration in IPv6, addresses can be uniquely and automatically generated. Unlike DHCPv6 (Dynamic Host Configuration Protocol version six) which is used in IPv6 stateful autoconfiguration, the owner and status of addresses don't need to be maintained by a DHCP server. Every IPv6 device is able to generate its own and unique IP address automatically when IPv6 is initiated on its interface. It combines the prefix and the interface ID (generated from its own Ethernet MAC address) to form a complete IPv6 address.

When IPv6 is enabled on a device, its interface automatically generates a link-local address (beginning with fe80).

When the Zyxel Device's WAN interface is connected to an ISP with a router and the Zyxel Device is set to automatically obtain an IPv6 network prefix from the router for the interface, it generates another address which combines its interface ID and global and subnet information advertised from the router. (In IPv6, all network interfaces can be associated with several addresses.) This is a routable global IP address.

Prefix Delegation

Prefix delegation enables an IPv6 router (the Zyxel Device) to use the IPv6 prefix (network address) received from the ISP (or a connected uplink router) for its LAN. The Zyxel Device uses the received IPv6 prefix (for example, 2001:db2::/48) to generate its LAN IP address. Through sending Router Advertisements (RAs) regularly by multicast, the router passes the IPv6 prefix information to its LAN hosts. The hosts then can use the prefix to generate their IPv6 addresses.

IPv6 Router Advertisement

An IPv6 router sends router advertisement messages periodically to advertise its presence and other parameters to the hosts on the same network.

DHCPv6

The Dynamic Host Configuration Protocol for IPv6 (DHCPv6, RFC 3315) is a server-client protocol that allows a DHCP server to assign and pass IPv6 network addresses, prefixes and other configuration information to DHCP clients. DHCPv6 servers and clients exchange DHCP messages using UDP.

Each DHCP client and server has a unique DHCP Unique IDentifier (DUID), which is used for identification when they are exchanging DHCPv6 messages. The DUID is generated from the MAC address, time, vendor assigned ID and/or the vendor's private enterprise number registered with the IANA. It should not change over time even after you reboot the device.

9.1.3 What You Need to Do First

For IPv6 settings, go to the Configuration > System > IPv6 screen to enable IPv6 support on the Zyxel Device first.

9.2 Port Role

To access this screen, click Configuration > Network > Interface > Port Role. Use the Port Role screen to set the Zyxel Device's physical ports to ZONE interfaces. This creates a hardware connection between the physical ports at the layer-2 (data link, MAC address) level. This provides wire-speed throughput but no security.

Note the following if you are configuring from a computer connected to a lan1, lan2, ext-wlan, ext-lan or dmz port and change the port's role:

  • A port's IP address varies as its role changes, make sure your computer's IP address is on the same subnet as the Zyxel Device's interface IP address.
  • Use the appropriate interface IP address to access the Zyxel Device.

Figure 180 Configuration > Network > Interface > Port Role
Port Ethernet PPP Cellular Tunnel VLAN Bridge VTI Trunk Port Role Port Configuration Configuration P1 10/100/1000 P2 P3 P4 P5 P6 P7 P8 sfp won1 (WAN) won2 (WAN) lan1 (LAN1) lan2 (LAN2) dmz (DMZ) opt (OPT) reserved Apply Reset

The physical Ethernet ports are shown at the top and the Ethernet interfaces and zones are shown at the bottom of the screen. Use the radio buttons to select for which interface (network) you want to use each physical port. For example, select a port's LAN radio button to use the port as part of the LAN interface. The port will use the Zyxel Device's LAN IP address and MAC address.

When you assign more than one physical port to a network, you create a port group. Port groups have the following characteristics:

  • There is a layer-2 Ethernet switch between physical ports in the port group. This provides wire-speed throughput but no security.
  • It can increase the bandwidth between the port group and other interfaces.
    • The port group uses a single MAC address.

Click Apply to save your changes and apply them to the Zyxel Device.

Click Reset to change the port groups to their current configuration (last-saved values).

9.3 Port Configuration

Use this screen to configure port settings. Click Configuration > Network > Interface > Port Configuration in the navigation panel to display the configuration screen.

Note: You cannot configure the speed and duplex mode of fiber ports.

Figure 181 Configuration > Network > Interface > Port Configuration
Port Ethernet PPP Cellular Tunnel VLAN Bridge VTI Trunk Port Role Port Configuration Configuration Edit Name Interface Type Settings Status P1 wan1 Copper Auto Negotiate 1000M/Full P2 wan2 Copper Auto Negotiate Down P3,opt Copper Auto Negotiate Down P4 lan1 Copper Auto Negotiate Down P5 lan1 Copper Auto Negotiate Down P6 lan1 Copper Auto Negotiate Down P7 dmz Copper Auto Negotiate Down Page 1 of 1 Show 50 items Displaying 1 - 7 of 7 Apply Reset

Each field is described in the following table.

Table 98 Configuration > Network > Interface > Port Configuration

LABEL DESCRIPTION
EditSelect an entry, and click this button to configure the speed and the duplex mode of the Ethernet connection on this port.
Name This field displays the name of the port.
Interface This field displays the interface for the port.
TypeThis field displays the cable type that is used on the port.
SettingsSelect the speed and the duplex mode of the Ethernet connection on this port. Choices are Auto Negotiate, 1000Mbps-Full Duplex, 100Mbps-Full Duplex, 100Mbps-Half Duplex, 10Mbps-Full Duplex, and 10Mbps-Half Duplex.Selecting Auto Negotiate allows one port to negotiate with a peer port automatically to obtain the connection speed (of up to 1000M) and duplex mode that both ends support. When auto-negotiation is turned on, a port on the Zyxel Device negotiates with the peer automatically to determine the connection speed and duplex mode. If the peer port does not support auto-negotiation or turns off this feature, the Zyxel Device determines the connection speed by detecting the signal on the cable and using half duplex mode. When the Zyxel Device's auto-negotiation is turned off, a port uses the pre-configured speed and duplex mode when making a connection, thus requiring you to make sure that the settings of the peer port are the same in order to connect.
StatusThis field displays the speed and the duplex mode of the Ethernet connection on the port.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

9.4 Ethernet Summary Screen

This screen lists every Ethernet interface and virtual interface created on top of Ethernet interfaces. If you enabled IPv6 on the Configuration > System > IPv6 screen, you can also configure Ethernet interfaces used for your IPv6 networks on this screen. To access this screen, click Configuration > Network > Interface > Ethernet.

Unlike other types of interfaces, you cannot create new Ethernet interfaces nor can you delete any of them. If an Ethernet interface does not have any physical ports assigned to it, the Ethernet interface is effectively removed from the Zyxel Device, but you can still configure it.

Ethernet interfaces are similar to other types of interfaces in many ways. They have an IP address, subnet mask, and gateway used to make routing decisions. They restrict the amount of bandwidth and packet size. They can provide DHCP services, and they can verify the gateway is available.

Use Ethernet interfaces to control which physical ports exchange routing information with other routers and how much information is exchanged through each one. The more routing information is exchanged, the more efficient the routers should be. However, the routers also generate more network traffic, and some routing protocols require a significant amount of configuration and management. The Zyxel Device supports the following routing protocols: RIP, OSPF and BGP. See Chapter 10 on page 336 for background information about these routing protocols.

Figure 182 Configuration > Network > Interface > Ethernet
Port Ethernet PPP Cellular Tunnel VLAN Bridge VTI Trunk Configuration Edit Remove Activate inactivate Create Virtual Interface References Sta... Name Description IP Address Mask 1 sp STATIC - 0.0.0.0 0.0.0.0 2 wan DHCP - 172.21.40.25 255.255.252.0 3 lon1 STATIC - 192.168.1.1 255.255.255.0 4 lon2 STATIC - 192.168.2.1 255.255.255.0 5 dmz STATIC - 192.168.3.1 255.255.255.0 6 opt STATIC - 0.0.0.0 0.0.0.0 Page 1 of 1 Show 50 items Displaying 1 - 6 of 6 IPv6 Configuration Edit Activate inactivate References Sta... Name Description IP Address 1 sp STATIC ::. 2 wan STATIC ::. 3 lon1 ::. 4 lon2 ::. 5 dmz ::. 6 opt ::. Page 1 of 1 Show 50 items Displaying 1 - 6 of 6 Apply Reset

Each field is described in the following table.

Table 99 Configuration > Network > Interface > Ethernet

LABEL DESCRIPTION
Configuration / IPv6 ConfigurationUse theConfigurationsection for IPv4 network settings. Use theIPv6 Configurationsection for IPv6 network settings if you connect your Zyxel Device to an IPv6 network. Both sections have similar fields as described below.
EditDouble-click an entry or select it and clickEditto open a screen where you can modify the entry's settings.
RemoveTo remove a virtual interface, select it and clickRemove. The Zyxel Device confirms you want to remove it before doing so.
ActivateTo turn on an interface, select it and clickActivate.
InactivateTo turn off an interface, select it and clickInactivate.
Create Virtual InterfaceTo open the screen where you can create a virtual Ethernet interface, select an Ethernet interface and clickCreate Virtual Interface.
ReferencesSelect an entry and clickReferencesto open a screen that shows which settings use the entry. SeeSection 9.4.4 on page 255for an example.
# This field is a sequential value, and it is not associated with any interface.
Status This icon is lit when the entry is active and dimmed when the entry is inactive.
Name This field displays the name of the interface.
Description This field displays the description of the interface.
IP AddressThis field displays the current IP address of the interface. If the IP address is 0.0.0.0 (on the IPv4 network) or :: (on the IPv6 network), the interface does not have an IP address yet.On the IPv4 network, this screen also shows whether the IP address is a static IP address (STATIC) or dynamically assigned (DHCP). IP addresses are always static in virtual interfaces.On the IPv6 network, this screen also shows whether the IP address is a static IP address (STATIC), link-local IP address (LINK LOCAL), dynamically assigned (DHCP), or an IPv6 StateLess Address AutoConfiguration IP address (SLAAC). See Section 9.1.2 on page 228 for more information about IPv6.
MaskThis field displays the interface’s subnet mask in dot decimal notation.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

9.4.1 Ethernet Edit

The Ethernet Edit screen lets you configure IP address assignment, interface parameters, RIP settings, OSPF settings, DHCP settings, connectivity check, and MAC address settings. To access this screen, click an Edit icon on the Ethernet Summary screen. (See Section 9.4 on page 235.)

The OPT interface's Edit > Configuration screen is shown here as an example. The screens for other interfaces are similar and contain a subset to the OPT interface screen's fields.

Note: If you create IP address objects based on an interface's IP address, subnet, or gateway, the Zyxel Device automatically updates every rule or setting that uses the object whenever the interface's IP address settings change. For example, if you change the VLAN's IP address, the Zyxel Device automatically updates the corresponding interface-based, LAN subnet address object.

With RIP, you can use Ethernet interfaces to do the following things.

  • Enable and disable RIP in the underlying physical port or port group.
  • Select which direction(s) routing information is exchanged - The Zyxel Device can receive routing information, send routing information, or do both.
  • Select which version of RIP to support in each direction - The Zyxel Device supports RIP-1, RIP-2, and both versions.
  • Select the broadcasting method used by RIP-2 packets - The Zyxel Device can use subnet broadcasting or multicasting.

With OSPF, you can use Ethernet interfaces to do the following things.

  • Enable and disable OSPF in the underlying physical port or port group.
  • Select the area to which the interface belongs.
  • Override the default link cost and authentication method for the selected area.
  • Select in which direction(s) routing information is exchanged - The Zyxel Device can receive routing information, send routing information, or do both.

Set the priority used to identify the DR or BDR if one does not exist.

9.4.1.1 IGMP Proxy

Internet Group Management Protocol (IGMP) proxy is used for multicast routing. IGMP proxy enables the Zyxel Device to issue IGMP host messages on behalf of hosts that the Zyxel Device discovered on its IGMP-enabled interfaces. The Zyxel Device acts as a proxy for its hosts. Refer to the following figure.

• DS: Downstream traffic
• US: Upstream traffic
• R: Router
• MS: Multicast Server
- Enable IGMP Upstream (US) on the Zyxel Device interface that connects to a router (R) running IGMP that is closer to the multicast server (MS).
- Enable IGMP Downstream on the Zyxel Device interface which connects to the multicast hosts.

Figure 183 IGMP Proxy
ZYXEL USGFLEX700-GB0101F - IGMP Proxy - 1

flowchart
graph LR
    A["LAN"] -->|DS| B["US"]
    C["LAN"] -->|DN| B
    D["MS"] --> E["Internet"]
    B --> F["R"]
    F --> E

Figure 184 Configuration > Network > Interface > Ethernet > Edit (External Type)
Edit Ethernet IPv4 View ▼ Hide Advanced Settings ▼ Create New Object General Settings ■ Enable Interface Interface Properties Interface Type: external Interface Name: wan Port: P2 Zone: WAN MAC Address: BC:CF:4F:47:7A:43 Description: [Optional] IP Address Assignment ● Get Automatically 172.21.40.25 ■ Advance DHCP Option 60: [Optional] ○ Use Fixed IP Address IP Address: Subnet Mask: Gateway: Metric: 0 (0-13) ○ Enable IGMP Support ● IGMP Upstream ○ IGMP Downstream Interface Parameters Egress Bandwidth: 1048576 Kbps ? ■ Advance Ingress Bandwidth: 1048576 Kbps MTU: 1500 Bytes Connectivity Check ■ Enable Connectivity Check Check Method: icmp Check Period: 30 (5-600 seconds) Check Timeout: 5 (1-10 seconds) Check Fail Tolerance: 5 (1-10) ● Check Default Gateway 172.21.43.254 ○ Check These Addresses [Domain Name or IP Address] Probe Succeeds When: any one respond(s) ■ Advance RIP Setting ■ Enable RIP Direction: BiDir Send Version: 2 Receive Version: 2 □ V2-Broadcast OSPF Setting Area: none Priority: 1 (0-255) Link Cost: 10 (1-65535) □ Passive Interface Authentication: None MAC Address Setting

MAC Address Setting Use Default MAC Address BC:CF:4F:47:7A:43 Overwrite Default MAC Address 00:00:00:00:00:00 Clone by Head Proxy ARP Enable Proxy ARP Add Remove IP Address Page 0 of 0 Show 50 Items No data to display Related Setting Configure PPPoE/PP1P OK Cancel

Figure 185 Configuration > Network > Interface > Ethernet > Edit (Internal Type)
Edit Ethernet IPv4 View ▼ Hide Advanced Settings Create New Object General Settings Enable Interface Interface Properties Interface Type: Internal Interface Name: Ian1 Port: P3, P4, P5 Zone: LAN1 MAC Address: BC:CF:4F:47:7A:44 Description: [Optional] IP Address Assignment IP Address: 192.168.1.1 Subnet Mask: 255.255.255.0 Enable IGMP Support IGMP Upstream IGMP Downstream Interface Parameters Egress Bandwidth: 1048576 Kbps Advance Ingress Bandwidth: 1048576 Kbps MTU: 1500 Bytes Advance Connectivity Check Enable Connectivity Check Check Method: icmp Check Period: 30 (5-600 seconds) Check Timeout: 5 (1-10 seconds) Check Fall Tolerance: 5 (1-10) Check These Addresses: (Domain Name or IP Address) (Optional) Probe Succeeds When: any one respond(s) DHCP Setting DHCP: DHCP Server IP Pool Start Address: 192.168.1.33 Pool Size: 200 First DNS Server (Optional): ZyWALL Second DNS Server (Optional): None Third DNS Server (Optional): None First WINS Server (Optional): Second WINS Server (Optional): Default Router: Ian1 IP Lease Time: infinite 2 days 0 hours (Optional) 0 minutes (Optional) Advance Extended Options Add Edit Remove Name Code Type Value Page 0 of 0 Show 50 Items No data to display PXE Server: PXE Boot Loader File: Enable IP/MAC Binding Enable Logs for IP/MAC Binding Violation Static DHCP Table Add

Enable IP/MAC Binding Enable Logs for IP/MAC Binding Violation Static DHCP Table Add Edit Remove IP Address MAC Description Page 0 of 0 Show 50 Items No data to display Advance RIP Setting Enable RIP Direction: BIDir Send Version: 2 Receive Version: 2 V2-Broadcast OSPF Setting Area: none Priority: 1 (0-255) Link Cost: 10 (1-65535) Passive Interface Authentication: None OK Cancel

Figure 186 Configuration > Network > Interface > Ethernet > Edit (OPT)
Edit Ethernet IPv4 View ▼ Hide Advanced Settings ▼ Create New Object General Settings ■ Enable Interface Interface Properties Interface Type: general ? Interface Name: opt Port: P6 Zone: OPT ? MAC Address: BC:CF:4F:47:7A:47 Description: (Optional) IP Address Assignment ○ Get Automatically ■ Advance DHCP Option 60: (Optional) ● Use Fixed IP Address IP Address: 0.0.0.0 Subnet Mask: 0.0.0.0 Gateway: (Optional) Metric: 0 (0-15) ■ Enable IGMP Support ○ IGMP Upstream ● IGMP Downstream Interface Parameters Egress Bandwidth: 1048576 Kbps ① ■ Advance Ingress Bandwidth: 1048576 Kbps MTU: 1500 Bytes Connectivity Check □ Enable Connectivity Check Check Method: icmp Check Period: 30 (5-600 seconds) Check Timeout: 5 (1-10 seconds) Check Fall Tolerance: 5 (1-10) ● Check Default Gateway 0.0.0.0 ○ Check These Addresses (Domain Name or IP Address) (Optional) Probe Succeeds When: any one respond(s) DHCP Setting DHCP: None □ Enable IP/MAC Binding □ Enable Logs for IP/MAC Binding Violation Static DHCP Table Add Edit Remove IP Address ▲ MAC Description Page 0 of 0 Show 50 Items No data to display ■ Advance RIP Setting □ Enable RIP Direction: BIDr Send Version: 2 Receive Version: 2 V2-Broadcast

V2-Broadcast OSPF Setting Area: none Priority: 1 (0-255) Link Cost: 10 (1-65535) Passive Interface Authentication: None MAC Address Setting Use Default MAC Address BC:CF:4F:47:7A:47 Overwrite Default MAC Address 00:00:00:00:00:00 Clone by hand Proxy ARP Enable Proxy ARP Add Remove IP Address Page 0 of 0 Show 50 Items No data to display Related Setting Configure PPPoE/PPIP Configure WAN TRUNK Configure Policy Route OK Cancel

These screen's fields are described in the table below.

Table 100 Configuration > Network > Interface > Ethernet > Edit

LABEL DESCRIPTION
IPv4/IPv6 View / IPv4 View / IPv6 ViewUse this button to display both IPv4 and IPv6, IPv4-only, or IPv6-only configuration fields.
Show Advanced Settings / Hide Advanced SettingsClick this button to display a greater or lesser number of configuration fields.
Create New ObjectClick this button to create a DHCPv6 lease or DHCPv6 request object that you may use for the DHCPv6 settings in this screen.
General Settings
Enable InterfaceSelect this to enable this interface. Clear this to disable this interface.
General IPv6 Setting
Enable IPv6Select this to enable IPv6 on this interface. Otherwise, clear this to disable it.
Interface Properties
Interface TypeThis field is configurable for the OPT interface only. Select to which type of network you will connect this interface. When you select internal or external the rest of the screen's options automatically adjust to correspond. The Zyxel Device automatically adds default route and SNAT settings for traffic it routes from internal interfaces to external interfaces; for example LAN to WAN traffic.internal is for connecting to a local network. Other corresponding configuration options: DHCP server and DHCP relay. The Zyxel Device automatically adds default SNAT settings for traffic flowing from this interface to an external interface.external is for connecting to an external network (like the Internet). The Zyxel Device automatically adds this interface to the default WAN trunk.For general, the rest of the screen's options do not automatically adjust and you must manually configure a policy route to add routing and SNAT settings for the interface.
Interface NameSpecify a name for the interface. It can use alphanumeric characters, hyphens, and underscores, and it can be up to 11 characters long.
PortThis is the name of the Ethernet interface's physical port.
ZoneSelect the zone to which this interface is to belong. You use zones to apply security settings such as security policy, IDP, remote management, anti-malware, and application patrol. Make sure to select the correct zone as otherwise traffic may be blocked by a security policy.
MAC AddressThis field is read-only. This is the MAC address that the Ethernet interface uses.
DescriptionEnter a description of this interface. You can use alphanumeric and ( ) +/ := ? ! *#@_ %- characters, and it can be up to 60 characters long. Spaces are allowed, but the string can't start with a space.
IP Address AssignmentThese IP address fields configure an IPv4 IP address on the interface itself. If you change this IP address on the interface, you may also need to change a related address object for the network connected to the interface. For example, if you use this screen to change the IP address of your LAN interface, you should also change the corresponding LAN subnet address object.
Get AutomaticallyThis option appears when Interface Type is external or general. Select this to make the interface a DHCP client and automatically get the IP address, subnet mask, and gateway address from a DHCP server.You should not select this if the interface is assigned to a VRRP group. See Chapter 40 on page 826.
DHCP Option 60DHCP Option 60 is used by the Zyxel Device for identification to the DHCP server using the VCI (Vendor Class Identifier) on the DHCP server. The Zyxel Device adds it in the initial DHCP discovery message that a DHCP client broadcasts in search of an IP address. The DHCP server can assign different IP addresses or options to clients with the specific VCI or reject the request from clients without the specific VCI.Type a string using up to 63 of these characters [a-zA-Z0-9!\"#%&\()*+,-./::<=>?@[\\\]\^_')] to identify this Zyxel Device to the DHCP server. For example, Zyxel-TW.
Use Fixed IP AddressThis option appears when Interface Type is external or general. Select this if you want to specify the IP address, subnet mask, and gateway manually.
IP Address Enter the IP address for this interface.
Subnet MaskEnter the subnet mask of this interface in dot decimal notation. The subnet mask indicates what part of the IP address is the same for all computers on the network.
GatewayThis option appears when Interface Type is external or general. Enter the IP address of the gateway. The Zyxel Device sends packets to the gateway when it does not know how to route the packet to its destination. The gateway should be on the same network as the interface.
MetricThis option appears when Interface Type is external or general. Enter the priority of the gateway (if any) on this interface. The Zyxel Device decides which gateway to use based on this priority. The lower the number, the higher the priority. If two or more gateways have the same priority, the Zyxel Device uses the one that was configured first.
Enable IGMP SupportSelect this to allow the Zyxel Device to act as an IGMP proxy for hosts connected on the IGMP downstream interface.
IGMP UpstreamEnable IGMP Upstream on the interface which connects to a router running IGMP that is closer to the multicast server.
IGMP DownstreamEnable IGMP Downstream on the interface which connects to the multicast hosts.
IPv6 Address AssignmentThese IP address fields configure an IPv6 IP address on the interface itself.
Enable Stateless Address Auto-configuration (SLAAC)Select this to enable IPv6 stateless auto-configuration on this interface. The interface will generate an IPv6 IP address itself from a prefix obtained from an IPv6 router on the network.
Link-Local AddressThis displays the IPv6 link-local address and the network prefix that the Zyxel Device generates itself for the interface.
IPv6 Address/ Prefix LengthEnter the IPv6 address and the prefix length for this interface if you want to use a static IP address. This field is optional.The prefix length indicates what the left-most part of the IP address is the same for all computers on the network, that is, the network address.
GatewayEnter the IPv6 address of the default outgoing gateway using colon (:) hexadecimal notation.
MetricEnter the priority of the gateway (if any) on this interface. The Zyxel Device decides which gateway to use based on this priority. The lower the number, the higher the priority. If two or more gateways have the same priority, the Zyxel Device uses the one that was configured first.
Address from DHCPv6 Prefix DelegationUse this table to have the Zyxel Device obtain an IPv6 prefix from the ISP or a connected uplink router for an internal network, such as the LAN or DMZ. You have to also enter a suffix address which is appended to the delegated prefix to form an address for this interface.See Prefix Delegation on page 232 for more information.To use prefix delegation, you must:Create at least one DHCPv6 request object before configuring this table.The external interface must be a DHCPv6 client. You must configure the DHCPv6 request options using a DHCPv6 request object with the type of prefix-delegation.Assign the prefix delegation to an internal interface and enable router advertisement on that interface.
Add Click this to create an entry.
Edit Select an entry and click this to change the settings.
RemoveSelect an entry and click this to delete it from this table.
ReferencesSelect an entry and click References to check which settings use the entry.
# This field is a sequential value, and it is not associated with any entry.
Delegated PrefixSelect the DHCPv6 request object to use from the drop-down list.
Suffix AddressEnter the ending part of the IPv6 address, a slash (/), and the prefix length. The Zyxel Device will append it to the delegated prefix.For example, you got a delegated prefix of 2003:1234:5678/48. You want to configure an IP address of 2003:1234:5678:1111::1/128 for this interface, then enter :1111:0:0:0:1/128 in this field.
Address This field displays the combined IPv6 IP address for this interface.Note: This field displays the combined address after you click OK and reopen this screen.
DHCPv6 Setting
DHCPv6Select N/A to not use DHCPv6.Select Client to set this interface to act as a DHCPv6 client.Select Server to set this interface to act as a DHCPv6 server which assigns IP addresses and provides subnet mask, gateway, and DNS server information to clients.Select Relay to set this interface to route DHCPv6 requests to the DHCPv6 relay server you specify. The DHCPv6 server(s) may be on another network.
DUIDThis field displays the DHCP Unique IDentifier (DUID) of the interface, which is unique and used for identification purposes when the interface is exchanging DHCPv6 messages with others. See DHCPv6 on page 233 for more information.
DUID as MACSelect this if you want the DUID is generated from the interface's default MAC address.
Customized DUID If you want to use a customized DUID, enter it here for the interface.
Enable Rapid CommitSelect this to shorten the DHCPv6 message exchange process from four to two steps. This function helps reduce heavy network traffic load.Note: Make sure you also enable this option in the DHCPv6 clients to make rapid commit work.
Information Refresh TimeEnter the number of seconds a DHCPv6 client should wait before refreshing information retrieved from DHCPv6.
Request AddressThis field is available if you set this interface to DHCPv6 Client. Select this to get an IPv6 IP address for this interface from the DHCP server. Clear this to not get any IP address information through DHCPv6.
DHCPv6 Request Options / DHCPv6 Lease OptionsIf this interface is a DHCPv6 client, use this section to configure DHCPv6 request settings that determine what additional information to get from the DHCPv6 server. If the interface is a DHCPv6 server, use this section to configure DHCPv6 lease settings that determine what additional information to offer to the DHCPv6 clients.
AddClick this to create an entry in this table. See Section 9.4.5 on page 256 for more information.
RemoveSelect an entry and click this to delete it from this table.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry. See Section 9.4.4 on page 255 for an example.
# This field is a sequential value, and it is not associated with any entry.
Name This field displays the name of the DHCPv6 request or lease object.
Type This field displays the type of the object.
ValueThis field displays the IPv6 prefix that the Zyxel Device obtained from an uplink router (Server is selected) or will advertise to its clients (Client is selected).
InterfaceWhen Relay is selected, select this check box and an interface from the drop-down list if you want to use it as the relay server.
Relay ServerWhen Relay is selected, select this check box and enter the IP address of a DHCPv6 server as the relay server.
IPv6 Router Advertisement Setting
Enable Router AdvertisementSelect this to enable this interface to send router advertisement messages periodically. See IPv6 Router Advertisement on page 232 for more information.
Advertised Hosts Get Network Configuration From DHCPv6Select this to have the Zyxel Device indicate to hosts to obtain network settings (such as prefix and DNS settings) through DHCPv6.Clear this to have the Zyxel Device indicate to hosts that DHCPv6 is not available and they should use the prefix in the router advertisement message.
Advertised Hosts Get Other Configuration From DHCPv6Select this to have the Zyxel Device indicate to hosts to obtain DNS information through DHCPv6.Clear this to have the Zyxel Device indicate to hosts that DNS information is not available in this network.
Router PreferenceSelect the router preference (Low, Medium or High) for the interface. The interface sends this preference in the router advertisements to tell hosts what preference they should use for the Zyxel Device. This helps hosts to choose their default router especially when there are multiple IPv6 router on the network.Note: Make sure the hosts also support router preference to make this function work.
MTUThe Maximum Transmission Unit. Type the maximum size of each IPv6 data packet, in bytes, that can move through this interface. If a larger packet arrives, the Zyxel Device discards the packet and sends an error message to the sender to inform this.
Hop LimitEnter the maximum number of network segments that a packet can cross before reaching the destination. When forwarding an IPv6 packet, IPv6 routers are required to decrease the Hop Limit by 1 and to discard the IPv6 packet when the Hop Limit is 0.
Advertised Prefix TableConfigure this table only if you want the Zyxel Device to advertise a fixed prefix to the network.
Add Click this to create an IPv6 prefix address.
EditSelect an entry in this table and click this to modify it.
RemoveSelect an entry in this table and click this to delete it.
# This field is a sequential value, and it is not associated with any entry.
IPv6 Address/ Prefix LengthEnter the IPv6 network prefix address and the prefix length.The prefix length indicates what the left-most part of the IP address is the same for all computers on the network, that is, the network address.
Advertised Prefix from DHCPv6 Prefix DelegationThis table is available when the Interface Type is internal. Use this table to configure the network prefix if you want to use a delegated prefix as the beginning part of the network prefix.
Add Click this to create an entry in this table.
EditSelect an entry in this table and click this to modify it.
RemoveSelect an entry in this table and click this to delete it.
# This field is a sequential value, and it is not associated with any entry.
Delegated PrefixSelect the DHCPv6 request object to use for generating the network prefix for the network.
Suffix AddressEnter the ending part of the IPv6 network address plus a slash (/) and the prefix length. The Zyxel Device will append it to the selected delegated prefix. The combined address is the network prefix for the network.For example, you got a delegated prefix of 2003:1234:5678/48. You want to divide it into 2003:1234:5678:1111/64 for this interface and 2003:1234:5678:2222/64 for another interface. You can use ::1111/64 and ::2222/64 for the suffix address respectively. But if you do not want to divide the delegated prefix into subnetworks, enter ::0/48 here, which keeps the same prefix length (/48) as the delegated prefix.
AddressThis is the final network prefix combined by the delegated prefix and the suffix.Note: This field displays the combined address after you click OK and reopen this screen.
Interface Parameters
Egress BandwidthEnter the maximum amount of traffic, in kilobits per second, the Zyxel Device can send through the interface to the network. Allowed values are 0 - 1048576.
Ingress BandwidthThis is reserved for future use.Enter the maximum amount of traffic, in kilobits per second, the Zyxel Device can receive from the network through the interface. Allowed values are 0 - 1048576.
MTUMaximum Transmission Unit. Type the maximum size of each data packet, in bytes, that can move through this interface. If a larger packet arrives, the Zyxel Device divides it into smaller fragments. Allowed values are 576 - 1500. Usually, this value is 1500.
Connectivity CheckThese fields appear when Interface Properties is External or General.The interface can regularly check the connection to the gateway you specified to make sure it is still available. You specify how often the interface checks the connection, how long to wait for a response before the attempt is a failure, and how many consecutive failures are required before the Zyxel Device stops routing to the gateway. The Zyxel Device resumes routing to the gateway the first time the gateway passes the connectivity check.
Enable Connectivity CheckSelect this to turn on the connection check.
Check Method SelectThe method that the gateway allows.Select icmp to have the Zyxel Device regularly ping the gateway you specify to make sure it is still available.Select tcp to have the Zyxel Device regularly perform a TCP handshake with the gateway you specify to make sure it is still available.
Check Period Enterthe number of seconds between connection check attempts.
Check TimeoutEnter the number of seconds to wait for a response before the attempt is a failure.
Check Fail ToleranceEnter the number of consecutive failures before the Zyxel Device stops routing through the gateway.
Check Default GatewaySelect this to use the default gateway for the connectivity check.
Check this addressSelect this to specify a domain name or IP address for the connectivity check. Enter that domain name or IP address on the field next to it.
Check PortThis field only displays when you set the Check Method to tcp. Specify the port number to use for a TCP connectivity check.
Check these addressesType one or two domain names or IP addresses for the connectivity check.
Probe Succeeds WhenThis field applies when you specify two domain names or IP addresses for the connectivity check.Select any one if you want the check to pass if at least one of the domain names or IP addresses responds.Select all if you want the check to pass only if both domain names or IP addresses respond.
DHCP SettingThis section appears when Interface Type is internal or general.
DHCPSelect what type of DHCP service the Zyxel Device provides to the network. Choices are: None - the Zyxel Device does not provide any DHCP services. There is already a DHCP server on the network.DHCP Relay - the Zyxel Device routes DHCP requests to one or more DHCP servers you specify. The DHCP server(s) may be on another network.DHCP Server - the Zyxel Device assigns IP addresses and provides subnet mask, gateway, and DNS server information to the network. The Zyxel Device is the DHCP server for the network.
These fields appear if the Zyxel Device is a DHCP Relay.
Relay Server 1 Enterthe IP address of a DHCP server for the network.
Relay Server 2This field is optional. Enter the IP address of another DHCP server for the network.
These fields appear if the Zyxel Device is a DHCP Server.
IP Pool Start AddressEnter the IP address from which the Zyxel Device begins allocating IP addresses. If you want to assign a static IP address to a specific computer, use the Static DHCP Table.If this field is blank, the Pool Size must also be blank. In this case, the Zyxel Device can assign every IP address allowed by the interface's IP address and subnet mask, except for the first address (network address), last address (broadcast address) and the interface's IP address.
Pool SizeEnter the number of IP addresses to allocate. This number must be at least one and is limited by the interface's Subnet Mask. For example, if the Subnet Mask is 255.255.255.0 and IP Pool Start Address is 10.10.10.10, the Zyxel Device can allocate 10.10.10.10 to 10.10.10.254, or 245 IP addresses.If this field is blank, the IP Pool Start Address must also be blank. In this case, the Zyxel Device can assign every IP address allowed by the interface's IP address and subnet mask, except for the first address (network address), last address (broadcast address) and the interface's IP address.
First DNS Server, Second DNS Server, Third DNS ServerSpecify the IP addresses up to three DNS servers for the DHCP clients to use. Use one of the following ways to specify these IP addresses.Custom Defined - enter a static IP address.From ISP - select the DNS server that another interface received from its DHCP server.Zyxel Device - the DHCP clients use the IP address of this interface and the Zyxel Device works as a DNS relay.
First WINS Server, Second WINS ServerType the IP address of the WINS (Windows Internet Naming Service) server that you want to send to the DHCP clients. The WINS server keeps a mapping table of the computer names on your network and the IP addresses that they are currently using.
Default RouterIf you set this interface to DHCP Server, you can select to use either the interface's IP address or another IP address as the default router. This default router will become the DHCP clients' default gateway.To use another IP address as the default router, select Custom Defined and enter the IP address.
Lease timeSpecify how long each computer can use the information (especially the IP address) before it has to request the information again. Choices are:infinite - select this if IP addresses never expire.days, hours, and minutes - select this to enter how long IP addresses are valid.
Extended OptionsThis table is available if you selected DHCP server.Configure this table if you want to send more information to DHCP clients through DHCP packets.
AddClick this to create an entry in this table. See Section 9.4.6 on page 257.
EditSelect an entry in this table and click this to modify it.
RemoveSelect an entry in this table and click this to delete it.
# This field is a sequential value, and it is not associated with any entry.
Name This is the name of the DHCP option.
Code This is the code number of the DHCP option.
Type This is the type of the set value for the DHCP option.
Value This is the value set for the DHCP option.
LABELDESCRIPTION
PXE ServerPXE (Preboot eXecution Environment) allows a client computer to use the network to boot up and install an operating system via a PXE-capable Network Interface Card (NIC).PXE is available for computers on internal interfaces to allow them to boot up using boot software on a PXE server. The Zyxel Device acts as an intermediary between the PXE server and the computers that need boot software.The PXE server must have a public IPv4 address. You must enable DHCP Server on the Zyxel Device so that it can receive information from the PXE server.
PXE Boot Loader FileA boot loader is a computer program that loads the operating system for the computer. Type the exact file name of the boot loader software file, including filename extension, that is on the PXE server. If the wrong filename is typed, then the client computers cannot boot.
Enable IP/MAC BindingSelect this option to have this interface enforce links between specific IP addresses and specific MAC addresses. This stops anyone else from manually using a bound IP address on another device connected to this interface. Use this to make use only the intended users get to use specific IP addresses.
Enable Logs for IP/MAC Binding ViolationSelect this option to have the Zyxel Device generate a log if a device connected to this interface attempts to use an IP address that is bound to another device's MAC address.
Static DHCP TableConfigure a list of static IP addresses the Zyxel Device assigns to computers connected to the interface. Otherwise, the Zyxel Device assigns an IP address dynamically using the interface's IP Pool Start Address and Pool Size.
Add Click this to create a new entry.
EditSelect an entry and click this to be able to modify it.
Remove Select an entry and click this to delete it.
# This field is a sequential value, and it is not associated with a specific entry.
IP AddressEnter the IP address to assign to a device with this entry's MAC address.
MAC Enter the MAC address to which to assign this entry's IP address.
DescriptionEnter a description to help identify this static DHCP entry. You can use alphanumeric and () +/ := ? ! *#@$_% - characters, and it can be up to 60 characters long.
RIP SettingSee Section 10.6 on page 337 for more information about RIP.
Enable RIP Select this to enable RIP in this interface.
DirectionThis field is effective when RIP is enabled. Select the RIP direction from the drop-down list box.BiDir - This interface sends and receives routing information.In-Only - This interface receives routing information.Out-Only - This interface sends routing information.
Send VersionThis field is effective when RIP is enabled. Select the RIP version(s) used for sending RIP packets. Choices are 1, 2, and 1 and 2.
Receive VersionThis field is effective when RIP is enabled. Select the RIP version(s) used for receiving RIP packets. Choices are 1, 2, and 1 and 2.
V2-BroadcastThis field is effective when RIP is enabled. Select this to send RIP-2 packets using subnet broadcasting; otherwise, the Zyxel Device uses multicasting.
OSPF SettingSee Section 10.7 on page 339 for more information about OSPF.
AreaSelect the area in which this interface belongs. Select None to disable OSPF in this interface.
PriorityEnter the priority (between 0 and 255) of this interface when the area is looking for a Designated Router (DR) or Backup Designated Router (BDR). The highest-priority interface identifies the DR, and the second-highest-priority interface identifies the BDR. Set the priority to zero if the interface can not be the DR or BDR.
Link CostEnter the cost (between 1 and 65,535) to route packets through this interface.
LABEL DESCRIPTION
Passive InterfaceSelect this to stop forwarding OSPF routing information from the selected interface. As a result, this interface only receives routing information.
AuthenticationSelect an authentication method, or disable authentication. To exchange OSPF routing information with peer border routers, you must use the same authentication method that they use. Choices are:Same-as-Area - use the default authentication method in the areaNone - disable authenticationText - authenticate OSPF routing information using a plain-text passwordMD5 - authenticate OSPF routing information using MD5 encryption
Text Authentication KeyThis field is available if the Authentication is Text. Type the password for text authentication. The key can consist of alphanumeric characters and the underscore, and it can be up to 16 characters long.
MD5 Authentication IDThis field is available if the Authentication is MD5. Type the ID for MD5 authentication. The ID can be between 1 and 255.
MD5 Authentication KeyThis field is available if the Authentication is MD5. Type the password for MD5 authentication. The password can consist of alphanumeric characters and the underscore, and it can be up to 16 characters long.
MAC Address SettingThis section appears when Interface Properties is External or General. Have the interface use either the factory assigned default MAC address, a manually specified MAC address, or clone the MAC address of another device or computer.
Use Default MAC AddressSelect this option to have the interface use the factory assigned default MAC address. By default, the Zyxel Device uses the factory assigned MAC address to identify itself.
Overwrite Default MAC AddressSelect this option to have the interface use a different MAC address. Either enter the MAC address in the fields or click Clone by host and enter the IP address of the device or computer whose MAC you are cloning. Once it is successfully configured, the address will be copied to the configuration file. It will not change unless you change the setting or upload a different configuration file.
Proxy ARPProxy ARP is available for external or general interfaces on the Zyxel Device. See Section 9.4.2 on page 253 for more information on Proxy ARP.
Enable Proxy ARPSelect this to allow the Zyxel Device to answer external interface ARP requests on behalf of a device on its internal interface. Interfaces supported are:E t h e r n e tV L A NBridgeSee Section 9.4.2 on page 253 for more information.
AddClick Add to create an IPv4 Address, an IPv4 CIDR (for example, 192.168.1.1/24) or an IPv4 Range (for example, 192.168.1.2-192.168.1.100) as the target IP address. The Zyxel Device answers external ARP requests only if they match one of these inputted target IP addresses. For example, if the IPv4 Address is 192.168.1.5, then the Zyxel Device will answer ARP requests coming from the WAN only if it contains 192.168.1.5 as the target IP address.Select an existing entry and click Remove to delete that entry.
Related Setting
Configure PPPoE/PPTPClick PPPoE/PPTP if this interface's Internet connection uses PPPoE or PPTP or L2TP.
Configure VLANClick VLAN if you want to configure a VLAN interface for this Ethernet interface.
Configure WAN TRUNKClick WAN TRUNK to go to a screen where you can set this interface to be part of a WAN trunk for load balancing.
Configure Policy RouteClick Policy Route to go to the policy route summary screen where you can manually associate traffic with this interface.You must manually configure a policy route to add routing and SNAT settings for an interface with the Interface Type set to general. You can also configure a policy route to override the default routing and SNAT behavior for an interface with an Interface Type of internal or external.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

9.4.2 Proxy ARP

An Address Resolution Protocol (ARP) is a protocol for mapping an IP address to a MAC address. An ARP broadcast is sent to all devices on the same Ethernet network to request the MAC address of a target IP address.

In the following figure, a host in a WAN subnet (A) broadcasts an ARP request to all devices within its network in order to find the MAC address of a target IP address (172.16.x.x). However, the target IP address may be in another subnet (B) that has the same network IP address (172.16.x.x). A router, such as the Zyxel Device, does not forward broadcasts, so the request will not reach its destination.

Enable Proxy ARP (RFC 1027) to allow the Zyxel Device to answer external interface ARP requests on behalf of a device on its internal interface. Interfaces supported are:

  • Ethernet
    • VLAN
  • Bridge

The Zyxel Device sends its external MAC address to the WAN sender as the destination for the target IP address. From then on the sender will send packets containing that target IP address directly to the external interface of the Zyxel Device. The Zyxel Device then forwards the packet to the correct target IP address in its LAN.

Figure 187 Proxy ARP
ZYXEL USGFLEX700-GB0101F - Proxy ARP - 1

flowchart
graph LR
    A["Target"] -->|172.16.x.x| B["LAN"]
    C["Sender"] -->|172.16.x.x| D["WAN"]
    B --> E["..."]
    D --> F["..."]
    style A fill:#f9f,stroke:#333
    style C fill:#f9f,stroke:#333
    style B fill:#ccf,stroke:#333
    style D fill:#ccf,stroke:#333

ZyWALL USG FLEX Series User's Guide

To allow the Zyxel Device to answer external interface ARP requests on behalf of a device on a supported interface, select the interface, click Add or Edit, then click Add in the Proxy ARP section of the screen.

Figure 188 Interface > Edit > Add Proxy ARP
Add Proxy ARP Address Interface Name: won2 Address Type: IPv4 Address IPv4 Address IPv4 CIDR IPv4 Range OK Cancel

The following table describes labels that can appear in this screen.

Table 101 Interface > Edit > Add Proxy ARP

LABEL DESCRIPTION
Interface NameThis identifies the interface for which the configuration settings that use it are displayed.
Address TypeChoose IPv4 Address, or IPv4 CIDR (for example, 192.168.1.1/24) or an IPv4 Range (for example, 192.168.1.2-192.168.1.100) and then enter the target IP address information. The Zyxel Device answers external ARP requests only if they match one of these inputted target IP addresses. For example, if the IPv4 Address is 192.168.1.5, then the Zyxel Device will answer ARP requests coming from the WAN only if it contains 192.168.1.5 as the target IP address.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

9.4.3 Virtual Interfaces

Use virtual interfaces to tell the Zyxel Device where to route packets. Virtual interfaces can also be used in VPN gateways (see Chapter 19 on page 418) and VRRP groups (see Chapter 40 on page 826).

Virtual interfaces can be created on top of Ethernet interfaces, VLAN interfaces, or bridge interfaces. Virtual VLAN interfaces recognize and use the same VLAN ID. Otherwise, there is no difference between each type of virtual interface. Network policies (for example, security policies) that apply to the underlying interface automatically apply to the virtual interface as well.

Like other interfaces, virtual interfaces have an IP address, subnet mask, and gateway used to make routing decisions. However, you have to manually specify the IP address and subnet mask; virtual interfaces cannot be DHCP clients. The virtual interface uses the same MTU and bandwidth settings that the underlying interface uses. Unlike other interfaces, virtual interfaces do not provide DHCP services, and they do not verify that the gateway is available.

This screen lets you configure IP address assignment and interface parameters for virtual interfaces. To access this screen, click the Create Virtual Interface icon on the Ethernet, VLAN, or bridge interface summary screen.

Figure 189 Configuration > Network > Interface > Create Virtual Interface
Create Virtual Interface Interface Properties Interface Name: wan2:1 Description: (Optional) IP Address Assignment IP Address: 0.0.0.0 Subnet Mask: 0.0.0.0 Gateway: (Optional) Metric: 0 (0..15) OK Cancel

Each field is described in the table below.

Table 102 Configuration > Network > Interface > Create Virtual Interface

LABEL DESCRIPTION
Interface Properties
Interface NameThis field is read-only. It displays the name of the virtual interface, which is automatically derived from the underlying Ethernet interface, VLAN interface, or bridge interface.
DescriptionEnter a description of this interface. It is not used elsewhere. You can use alphanumeric and ( ) +/ :=?!*#@$_% - characters, and it can be up to 60 characters long.
IP Address Assignment
IP Address Enter the IP address for this interface.
Subnet MaskEnter the subnet mask of this interface in dot decimal notation. The subnet mask indicates what part of the IP address is the same for all computers on the network.
GatewayEnter the IP address of the gateway. The Zyxel Device sends packets to the gateway when it does not know how to route the packet to its destination. The gateway should be on the same network as the interface.
MetricEnter the priority of the gateway (if any) on this interface. The Zyxel Device decides which gateway to use based on this priority. The lower the number, the higher the priority. If two or more gateways have the same priority, the Zyxel Device uses the one that was configured first.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

9.4.4 References

When a configuration screen includes an References icon, select a configuration object and click References to open the References screen. This screen displays which configuration settings reference the selected object. The fields shown vary with the type of object.

Figure 190 References
References Name sfp Service ▶ Priority Name Description 1 PPP: System Def... sfp_ppp N/A 2 Zone: System De... OPT N/A Page 1 of 1 Show 50 items Displaying 1 - 2 of 2 Refresh Cancel

The following table describes labels that can appear in this screen.

Table 103 References

LABEL DESCRIPTION
NameThis identifies the object for which the configuration settings that use it are displayed. Click the object's name to display the object's configuration screen in the main window.
#This field is a sequential value, and it is not associated with any entry.
ServiceThis is the type of setting that references the selected object. Click a service's name to display the service's configuration screen in the main window.
PriorityIf it is applicable, this field lists the referencing configuration item's position in its list, otherwise N/A displays.
NameThis field identifies the configuration item that references the object.
DescriptionIf the referencing configuration item has a description configured, it displays here.
RefreshClick this to update the information in this screen.
CancelClick Cancel to close the screen.

9.4.5 Add/Edit DHCPv6 Request/Release Options

When you configure an interface as a DHCPv6 server or client, you can additionally add DHCPv6 request or lease options which have the Zyxel Device to add more information in the DHCPv6 packets. To open the screen, click Configuration > Network > Interface > Ethernet > Edit, select DHCPv6 Server or DHCPv6 Client in the DHCPv6 Setting section, and then click Add in the DHCPv6 Request Options or DHCPv6 Lease Options table.

Figure 191 Configuration > Network > Interface > Ethernet > Edit > Add DHCPv6 Request/Lease Options
Add Request Object Select one object : Please select one OK Cancel

Select a DHCPv6 request or lease object in the Select one object field and click OK to save it. Click Cancel to exit without saving the setting.

9.4.6 Add/Edit DHCP Extended Options

When you configure an interface as a DHCPv4 server, you can additionally add DHCP extended options which have the Zyxel Device to add more information in the DHCP packets. The available fields vary depending on the DHCP option you select in this screen. To open the screen, click Configuration > Network > Interface > Ethernet > Edit, select DHCP Server in the DHCP Setting section, and then click Add or Edit in the Extended Options table.

Figure 192 Configuration > Network > Interface > Ethernet > Edit > Add/Edit Extended Options
Add DHCP Option Option: User Defined Name: User_Defined Code: Type: BOOL/ Value:

The following table describes labels that can appear in this screen.

Table 104 Configuration > Network > Interface > Ethernet > Edit > Add/Edit Extended Options

LABEL DESCRIPTION
OptionSelect which DHCP option that you want to add in the DHCP packets sent through the interface. See the next table for more information.
NameThis field displays the name of the selected DHCP option. If you selectedUser Definedin theOptionfield, enter a descriptive name to identify the DHCP option. You can enter up to 16 characters ("a-z", "A-Z, "0-9", "-", and "_") with no spaces allowed. The first character must be alphabetical (a-z, A-Z).
CodeThis field displays the code number of the selected DHCP option. If you selectedUser Definedin theOptionfield, enter a number for the option. This field is mandatory.
TypeThis is the type of the selected DHCP option. If you selectedUser Definedin theOptionfield, select an appropriate type for the value that you will enter in the next field. Only advanced users should configureUser Defined. Misconfiguration could result in interface lockout.
ValueEnter the value for the selected DHCP option. For example, if you selectedTFTP Server Name(66)and the type isTEXT, enter the DNS domain name of a TFTP server here. This field is mandatory.
First IP Address, Second IP Address, Third IP AddressIf you selectedTime Server (4), NTP Server (41), SIP Server (120), CAPWAP AC (138), orTFTP Server (150), you have to enter at least one IP address of the corresponding servers in these fields. The servers should be listed in order of your preference.
First Enterprise ID, Second Enterprise IDIf you selectedVIVC (124) or VIVS (125), you have to enter at least one vendor's 32-bit enterprise number in these fields. An enterprise number is a unique number that identifies a company.
First Class, Second ClassIf you selectedVIVC (124), enter the details of the hardware configuration of the host on which the client is running, or of industry consortium compliance.
First Information, Second InformationIf you selectedVIVS (125), enter additional information for the corresponding enterprise number in these fields.

Table 104 Configuration > Network > Interface > Ethernet > Edit > Add/Edit Extended Options

LABELDESCRIPTION
OKClick this to close this screen and update the settings to the previous Edit screen.
CancelClick Cancel to close the screen.

The following table lists the available DHCP extended options (defined in RFCs) on the Zyxel Device. See RFCs for more information.

Table 105 DHCP Extended Options

OPTION NAME CODE DESCRIPTION
Time Offset2This option specifies the offset of the client's subnet in seconds from Coordinated Universal Time (UTC).
Time Server4This option specifies a list of Time servers available to the client.
NTP Server42This option specifies a list of the NTP servers available to the client by IP address.
TFTP Server Name66This option is used to identify a TFTP server when the “sname” field in the DHCP header has been used for DHCP options. The minimum length of the value is 1.
Bootfile67This option is used to identify a bootfile when the “file” field in the DHCP header has been used for DHCP options. The minimum length of the value is 1.
SIP Server120This option carries either an IPv4 address or a DNS domain name to be used by the SIP client to locate a SIP server.
VIVC124Vendor-Identifying Vendor Class optionA DHCP client may use this option to unambiguously identify the vendor that manufactured the hardware on which the client is running, the software in use, or an industry consortium to which the vendor belongs.
VIVS125Vendor-Identifying Vendor-Specific optionDHCP clients and servers may use this option to exchange vendor-specific information.
CAPWAP AC138CAPWAP Access Controller addresses optionThe Control And Provisioning of Wireless Access Points Protocol allows a Wireless Termination Point (WTP) to use DHCP to discover the Access Controllers to which it is to connect. This option carries a list of IPv4 addresses indicating one or more CAPWAP ACs available to the WTP.
TFTP Server150The option contains one or more IPv4 addresses that the client may use. The current use of this option is for downloading configuration from a VoIP server via TFTP; however, the option may be used for purposes other than contacting a VoIP configuration server.

9.5 PPP Interfaces

Use PPPoE/PPTP/L2TP interfaces to connect to your ISP. This way, you do not have to install or manage PPPoE/PPTP/L2TP software on each computer on the network.

Figure 193 Example: PPPoE/PPTP/L2TP Interfaces
ZYXEL USGFLEX700-GB0101F - PPP Interfaces - 1

flowchart
graph LR
    A["Z"] --> B["Internet"]
    B --> C["ISP"]

PPPoE/PPTP/L2TP interfaces are similar to other interfaces in some ways. They have an IP address, subnet mask, and gateway used to make routing decisions; they restrict bandwidth and packet size; and they can verify the gateway is available. There are two main differences between PPPoE/PPTP/L2TP interfaces and other interfaces.

- You must also configure an ISP account object for the PPPoE/PPTP/L2TP interface to use.

Each ISP account specifies the protocol (PPPoE or PPTP or L2TP), as well as your ISP account information. If you change ISPs later, you only have to create a new ISP account, not a new PPPoE/PPTP/L2TP interface. You should not have to change any network policies.

- You do not set up the subnet mask or gateway.

PPPoE/PPTP/L2TP interfaces are interfaces between the Zyxel Device and only one computer. Therefore, the subnet mask is always 255.255.255.255. In addition, the Zyxel Device always treats the ISP as a gateway.

9.5.1 PPP Interface Summary

This screen lists every PPPoE/PPTP/L2TP interface. To access this screen, click Configuration > Network > Interface > PPP.

Figure 194 Configuration > Network > Interface > PPP
Port Ethernet PPP Cellular Tunnel VLAN Bridge VTI Trunk User Configuration Add Edit Remove Activate Inactivate Connect Disconnect References Status Name Descrl... Base Interface Account Profile Page 0 of 0 Show 50 Items No data to display System Default Edit Activate Inactivate Connect Disconnect References Status Name Descrl... Base Interface Account Profile 1 wan_ppp wan WAN_PPPoE_ACCOUNT 2 sfp_ppp sfp SFP_PPPoE_ACCOUNT 3 opt_ppp opt OPT_PPPoE_ACCOUNT Page 1 of 1 Show 50 items Displaying 1 - 3 of 3 Apply Reset

Each field is described in the table below.

Table 106 Configuration > Network > Interface > PPP

LABEL DESCRIPTION
User Configuration / System DefaultThe Zyxel Device comes with the (non-removable) System Default PPP interfaces pre-configured. You can create (and delete) User Configuration PPP interfaces. System Default PPP interfaces vary by model.
Add Click this to createa new user-configured PPP interface.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove a user-configured PPP interface, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
ConnectTo connect an interface, select it and click Connect. You might use this in testing the interface or to manually establish the connection for a Dial-on-Demand PPPoE/PPTP interface.
DisconnectTo disconnect an interface, select it and click Disconnect. You might use this in testing the interface.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry. See Section 9.4.4 on page 255 for an example.
# This field is a sequential value, and it is not associated with any interface.
StatusThe activate (light bulb) icon is lit when the entry is active and dimmed when the entry is inactive.The connect icon is lit when the interface is connected and dimmed when it is disconnected.
Name This field displays the name of the interface.
Description This field displays the description of the interface.
Base InterfaceThis field displays the interface on the top of which the PPPoE/PPTP/L2TP interface is.
Account ProfileThis field displays the ISP account used by this PPPoE/PPTP interface.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

9.5.2 PPP Interface Add or Edit

Note: You have to set up an ISP account before you create a PPPoE/PPTP/L2TP interface.

This screen lets you configure a PPPoE or PPTP or L2TP interface. If you enabled IPv6 on the Configuration > System > IPv6 screen, you can also configure PPP interfaces used for your IPv6 networks on this screen. To access this screen, click the Add icon or an Edit icon on the PPP Interface screen.

Figure 195 Configuration > Network > Interface > PPP > Add
Add PPPoE/PPTP IPvA/IPv6 View ▼ Hide Advanced Settings Create new Object General Settings Enable Interface General IPv6 Setting Enable IPv6 Interface Properties Interface Name: Base Interface: Zone: Description: Interface Properties Interface Name: None (Optonal) Connectivity Nalled-Up Dial-on-Demand ISP Setting Account Profile: WANT_PPPoE_ACC Protocol: poppoe User Name : Service Name: IP Address Assignment Get Automatically 0.0.0.0 Use Fixed IP Address IP Address: Advance Options: (Optional) Metric: 0 (0-15) IPv6 Address Assignment Enable Stateless Address Auto-configuration (SLAAC) Metric: (0-15) Advance Address from DHCPv6 Prefix Delegation Add Edit Remove References Delegated Prefix Suffix Address Address 14 Page 0 of 0 Show 50 Items No data to display DHCPv6 Setting DHCPv6: Client DUID: Advance DUID as MAC: Customized DUID: Enable Rapid Commit Request Address DHCPv6 Request Options Add Remove References Name Type Value 14 Page 0 of 0 Show 50 Items No data to dis Interface Parameters Egress Bandwidth: 1043576 Kbps Advance Ingress Bandwidths: 1043576 Kbps MTU: 1492 Bytes Connectivity Check Enable Connectivity Check Check Method: icmp Check Period: 30 (5-600 seconds) Check Timeout: 5 (1-10 seconds) Check Fail Tolerance: 5 (1-10) Check Default Gateway 0.0.0.0 Check this address (Domain Name or IP Address) Related Setting Configure WAN TRUNK Configure Policy Route OK Cancel

Each field is explained in the following table.

Table 107 Configuration > Network > Interface > PPP > Add

LABEL DESCRIPTION
IPv4/IPv6 View / IPv4View / IPv6 ViewUse this button to display both IPv4 and IPv6, IPv4-only, or IPv6-only configuration fields.
Show Advanced Settings / Hide Advanced SettingsClick this button to display a greater or lesser number of configuration fields.
Create New ObjectClick this button to create an ISP Account or a DHCPv6 request object that you may use for the ISP or DHCPv6 settings in this screen.
General Settings
Enable InterfaceSelect this to enable this interface. Clear this to disable this interface.
General IPv6 Setting
Enable IPv6Select this to enable IPv6 on this interface. Otherwise, clear this to disable it.
Interface Properties
Interface NameSpecify a name for the interface. It can use alphanumeric characters, hyphens, and underscores, and it can be up to 11 characters long.
Base InterfaceSelect the interface upon which this PPP interface is built.Note: Multiple PPP interfaces can use the same base interface.
ZoneSelect the zone to which this PPP interface belongs. The zone determines the security settings the Zyxel Device uses for the interface.
DescriptionEnter a description of this interface. You can use alphanumeric and ( ) + / : = ? ! * #@$ _ %-characters, and it can be up to 60 characters long. Spaces are allowed, but the string can't start with a space.
Connectivity
Nailed-UpSelect this if the PPPoE/PPTP/L2TP connection should always be up. Clear this to have the Zyxel Device establish the PPPoE/PPTP/L2TP connection only when there is traffic. You might use this option if a lot of traffic needs to go through the interface or it does not cost extra to keep the connection up all the time.
Dial-on-DemandSelect this to have the Zyxel Device establish the PPPoE/PPTP/L2TP connection only when there is traffic. You might use this option if there is little traffic through the interface or if it costs money to keep the connection available.
ISP Setting
Account ProfileSelect the ISP account that this PPPoE/PPTP/L2TP interface uses. The drop-down box lists ISP accounts by name. Use Create new Object if you need to configure a new ISP account (see Chapter 39 on page 819 for details).
Protocol This field is read-only. It displays the protocol specified in the ISP account.
User NameThis field is read-only. It displays the user name for the ISP account.
Service NameThis field is read-only. It displays the PPPoE service name specified in the ISP account. This field is blank if the ISP account uses PPTP.
IP Address AssignmentClick Show Advanced Settings to display more settings. Click Hide Advanced Settings to display fewer settings.
Get AutomaticallySelect this if this interface is a DHCP client. In this case, the DHCP server configures the IP address automatically. The subnet mask and gateway are always defined automatically in PPPoE/PPTP/L2TP interfaces.
Use Fixed IP AddressSelect this if you want to specify the IP address manually.
IP AddressThis field is enabled if you select Use Fixed IP Address.Enter the IP address for this interface.
GatewayThis field is enabled if you selectUse Fixed IP Address.Enter the IP address of the gateway. The Zyxel Device sends packets to the gateway when it does not know how to route the packet to its destination. The gateway should be on the same network as the interface.
MetricEnter the priority of the gateway (the ISP) on this interface. The Zyxel Device decides which gateway to use based on this priority. The lower the number, the higher the priority. If two or more gateways have the same priority, the Zyxel Device uses the one that was configured first.
IPv6 Address AssignmentThese IP address fields configure an IPv6 IP address on the interface itself.
Enable Stateless Address Auto-configuration (SLAAC)Select this to enable IPv6 stateless auto-configuration on this interface. The interface will generate an IPv6 IP address itself from a prefix obtained from an IPv6 router on the network.
MetricEnter the priority of the gateway (if any) on this interface. The Zyxel Device decides which gateway to use based on this priority. The lower the number, the higher the priority. If two or more gateways have the same priority, the Zyxel Device uses the one that was configured first.
Address from DHCPv6 Prefix DelegationUse this table to have the Zyxel Device obtain an IPv6 prefix from the ISP or a connected uplink router for an internal network, such as the LAN or DMZ. You have to also enter a suffix address which is appended to the delegated prefix to form an address for this interface.SeePrefix Delegation on page 232for more information.To use prefix delegation, you must:Create at least one DHCPv6 request object before configuring this table.The external interface must be a DHCPv6 client. You must configure the DHCPv6 request options using a DHCPv6 request object with the type of prefix-delegation.Assign the prefix delegation to an internal interface and enable router advertisement on that interface.
Add Click this to create an entry.
Edit Select an entry and click this to change the settings.
RemoveSelect an entry and click this to delete it from this table.
ReferencesSelect an entry and clickReferencesto open a screen that shows which settings use the entry.
# This field is a sequential value, and it is not associated with any entry.
Delegated PrefixSelect the DHCPv6 request object to use from the drop-down list.
Suffix AddressEnter the ending part of the IPv6 address, a slash (/), and the prefix length. The Zyxel Device will append it to the delegated prefix.For example, you got a delegated prefix of 2003:1234:5678/48. You want to configure an IP address of 2003:1234:5678:1111::1/128 for this interface, then enter :1111:0:0:0:1/128 in this field.
Address This field displays the combined IPv6 IP address for this interface.Note: This field displays the combined address after you clickOKand reopen this screen.
DHCPv6 Setting
DHCPv6SelectClientto obtain an IP address and DNS information from the service provider for the interface. Otherwise, selectN/Ato disable the function.
DUIDThis field displays the DHCP Unique IDentifier (DUID) of the interface, which is unique and used for identification purposes when the interface is exchanging DHCPv6 messages with others. SeeDHCPv6 on page 233for more information.
LABELDESCRIPTION
DUID as MACSelect this if you want the DUID is generated from the interface's default MAC address.
Customized DUID If you want to use a customized DUID, enter it here for the interface.
Enable Rapid CommitSelect this to shorten the DHCPv6 message exchange process from four to two steps. This function helps reduce heavy network traffic load.Note: Make sure you also enable this option in the DHCPv6 clients to make rapid commit work.
Request AddressSelect this to get an IPv6 IP address for this interface from the DHCP server. Clear this to not get any IP address information through DHCPv6.
DHCPv6 Request OptionsUse this section to configure DHCPv6 request settings that determine what additional information to get from the DHCPv6 server.
AddClick this to create an entry in this table. See Section 9.4.6 on page 257 for more information.
RemoveSelect an entry and click this to delete it from this table.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry. See Section 9.4.4 on page 255 for an example.
Name This field displays the name of the DHCPv6 request object.
Type This field displays the type of the object.
ValueThis field displays the IPv6 prefix that the Zyxel Device will advertise to its clients.
Interface Parameters
Egress BandwidthEnter the maximum amount of traffic, in kilobits per second, the Zyxel Device can send through the interface to the network. Allowed values are 0 - 1048576.
Ingress BandwidthThis is reserved for future use.Enter the maximum amount of traffic, in kilobits per second, the Zyxel Device can receive from the network through the interface. Allowed values are 0 - 1048576.
MTUMaximum Transmission Unit. Type the maximum size of each data packet, in bytes, that can move through this interface. If a larger packet arrives, the Zyxel Device divides it into smaller fragments. Allowed values are 576 - 1492. Usually, this value is 1492.
Connectivity CheckThe interface can regularly check the connection to the gateway you specified to make sure it is still available. You specify how often the interface checks the connection, how long to wait for a response before the attempt is a failure, and how many consecutive failures are required before the Zyxel Device stops routing to the gateway. The Zyxel Device resumes routing to the gateway the first time the gateway passes the connectivity check.
Enable Connectivity CheckSelect this to turn on the connection check.
Check Method Select the method that the gateway allows.Select icmp to have the Zyxel Device regularly ping the gateway you specify to make sure it is still available.Select tcp to have the Zyxel Device regularly perform a TCP handshake with the gateway you specify to make sure it is still available.
Check Period Enter the number of seconds between connection check attempts.
Check TimeoutEnter the number of seconds to wait for a response before the attempt is a failure.
Check Fail ToleranceEnter the number of consecutive failures before the Zyxel Device stops routing through the gateway.
Check Default GatewaySelect this to use the default gateway for the connectivity check.
LABEL DESCRIPTION
Check this addressSelect this to specify a domain name or IP address for the connectivity check. Enter that domain name or IP address in the field next to it.
Check PortThis field only displays when you set the Check Method to tcp. Specify the port number to use for a TCP connectivity check.
Related Setting
Configure WAN TRUNKClick WAN TRUNK to go to a screen where you can configure the interface as part of a WAN trunk for load balancing.
Policy RouteClick Policy Route to go to the screen where you can manually configure a policy route to associate traffic with this interface.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

9.6 Cellular Configuration Screen

Mobile broadband is a digital, packet-switched wireless technology. Bandwidth usage is optimized as multiple users share the same channel and bandwidth is only allocated to users when they send data. It allows fast transfer of voice and non-voice data and provides broadband Internet access to mobile devices.

Note: The actual data rate you obtain varies depending on the mobile broadband device you use, the signal strength to the service provider's base station, and so on.

You can configure how the Zyxel Device's mobile broadband device connects to a network (refer to Section 9.6.1 on page 268):

  • You can set the mobile broadband device to connect only to the home network, which is the network to which you are originally subscribed.
  • You can set the mobile broadband device to connect to other networks if the signal strength of the home network is too low or it is unavailable.

3G

3G (Third Generation) is a digital, packet-switched wireless technology. Bandwidth usage is optimized as multiple users share the same channel and bandwidth is only allocated to users when they send data. It allows fast transfer of voice and non-voice data and provides broadband Internet access to mobile devices.

4G

4G is the fourth generation of the mobile telecommunications technology and a successor of 3G. Both the WiMAX and Long Term Evolution (LTE) standards are the 4G candidate systems. 4G only supports all-IP-based packet-switched telephony services and is required to offer Gigabit speed access.

Note: The actual data rate you obtain varies depending on your mobile environment. The environmental factors may include the number of mobile devices which are currently connected to the mobile network, the signal strength to the mobile network, and so on.

See the following table for a comparison between 2G, 2.5G, 2.75G, 3G and 4G wireless technologies.

Table 108 2G, 2.5G, 2.75G, 3G, 3.5G and 4G Wireless Technologies

NAME TYPEMOBILE PHONE AND DATA STANDARDSDATA SPEED
GSM-BASED CDMA-BASED
2G Circuit-switchedGSM (Global System for Mobile Communications), Personal Handy-phone System (PHS), etc.Interim Standard 95 (IS-95), the first CDMA-based digital cellular standard pioneered by Qualcomm. The brand name for IS-95 is cdmaOne. IS-95 is also known as TIA-EIA-95.Slow
2.5G Packet-switchedGPRS (General Packet Radio Services), High-Speed Circuit-Switched Data (HSCSD), etc.CDMA2000 is a hybrid 2.5G / 3G protocol of mobile telecommunications standards that use CDMA, a multiple access scheme for digital radio.
2.75G Packet-switchedEnhanced Data rates for GSM Evolution (EDGE), Enhanced GPRS (EGPRS), etc.CDMA2000 1xRTT (1 times Radio Transmission Technology) is the core CDMA2000 wireless air interface standard. It is also known as 1x, 1xRTT, or IS-2000 and considered to be a 2.5G or 2.75G technology.
3G Packet-switchedUMTS (Universal Mobile Telecommunications System), a third-generation (3G) wireless standard defined in ITU specification, is sometimes marketed as 3GSM. The UMTS uses GSM infrastructures and W-CDMA (Wideband Code Division Multiple Access) as the air interface. The International Telecommunication Union (ITU) is an international organization within which governments and the private sector coordinate global telecom networks and services.CDMA2000 EV-DO (Evolution-Data Optimized, originally 1x Evolution-Data Only), also referred to as EV-DO, EVDO, or just EV, is an evolution of CDMA2000 1xRTT and enables high-speed wireless connectivity. It is also denoted as IS-856 or High Data Rate (HDR).
3.5G Packet-switchedHSDPA (High-Speed Downlink Packet Access) is a mobile telephony protocol, used for UMTS-based 3G networks and allows for higher data transfer speeds.
4G/LTE Packet-switchedThe LTE (Long Term Evolution) standard is based on the GSM and UMTS network technologies.

To change your mobile broadband WAN settings, click Configuration > Network > Interface > Cellular.

Note: Install (or connect) a compatible mobile broadband USB device to use a cellular connection.

Note: The WAN IP addresses of a Zyxel Device with multiple WAN interfaces must be on different subnets.

Figure 196 Configuration > Network > Interface > Cellular
Port Ethernet PPP Cellular Tunnel VLAN Bridge VTI Trunk Cellular Interface Summary Add Edit Remove Activate Inactivate Connect Disconnect References Status Name Description Extension Slot Connected Device ISP Settings Page of 0 cf 0 Show 50 Items No data to display Mobile Broadband Dongle Support Update Latest Version: N/A Current Version: N/A Note: Please register at portal.myzyxe.com to enable version check and software update capability. Update Now Apply Reset

The following table describes the labels in this screen.

Table 109 Configuration > Network > Interface > Cellular

LABEL DESCRIPTION
Add Click this to create a new cellular interface.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
ConnectTo connect an interface, select it and click Connect. You might use this in testing the interface or to manually establish the connection.
DisconnectTo disconnect an interface, select it and click Disconnect. You might use this in testing the interface.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry. See Section 9.4.4 on page 255 for an example.
# This field is a sequential value, and it is not associated with any interface.
StatusThe activate (light bulb) icon is lit when the entry is active and dimmed when the entry is inactive.The connect icon is lit when the interface is connected and dimmed when it is disconnected.
Name This field displays the name of the interface.
Description This field displays the description of the interface.
Extension SlotThis field displays where the entry's cellular card is located.
Connected DeviceThis field displays the name of the cellular card.
ISP SettingsThis field displays the profile of ISP settings that this cellular interface is set to use.
Mobile Broadband Dongle SupportYou should have registered your Zyxel Device at myZyxel. myZyxel hosts a list of supported mobile broadband dongle devices. You should have an Internet connection to access this website.
LABEL DESCRIPTION
Latest VersionThis displays the latest supported mobile broadband dongle list version number.
Current VersionThis displays the currently supported (by the Zyxel Device) mobile broadband dongle list version number.
Update NowIf the latest version number is greater than the current version number, then click this button to download the latest list of supported mobile broadband dongle devices to the Zyxel Device.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

9.6.1 Cellular Choose Slot

To change your mobile broadband settings, click Configuration > Network > Interface > Cellular > Add (or Edit). In the pop-up window that displays, select the slot that contains the mobile broadband device, then the Add Cellular configuration screen displays.

Slot selection Please select one slot to configure Slot USB 1 USB 2 Cancel

9.6.2 Add / Edit Cellular Configuration

This screen displays after you select the slot that contains the mobile broadband device in the previous pop-up window.

Figure 197 Configuration > Network > Interface > Cellular > Add / Edit
Add Cellular configuration Hide Advanced Settings General Settings Enable Interface Interface Properties Interface Name: cellular Zone: none Extension Slot: USB 1 Connected Device: none Description: (Optional) Connectivity Nailed-Up Idle timeout: 0 seconds ISP Settings Profile Selection: Device Custom Profile 1 AFN: n/a Dial String: n/a SIM Card Setting PIN Code: Retype to Confirm: Interface Parameters Egress Bandwidth: 1048576 Kbps Advance Ingress Bandwidth: 1048576 Kbps MTU: 1492 Bytes Connectivity Check Enable Connectivity Check Check Method: icmp Check Period: 30 (5-600 seconds) Check Timeout: 5 (1-10 seconds) Check Fall Tolerance: 5 (1-10) Check Default Gateway 0.0.0.0 Check this address (Domain Name or IP Address) Related Setting Configure WAN TRUNK Configure Policy Route IP Address Get Automatically 0.0.0.0 Use Fixed IP Address Address Assignment: Metric: 0 (0-15) Device Settings Network Selection: auto Advance Budget Setup Enable Budget Control Time Budget: hours per month Data Budget: Mbytes Download/upload per month Reset time and data budget counters on: Last day of each month Actions when over budget Log: None New connection: Allow Current connection: Keep Actions when over 0 % of time budget or 0 % of data budget Log: None OK Cancel

The following table describes the labels in this screen.

Table 110 Configuration > Network > Interface > Cellular > Add / Edit

LABEL DESCRIPTION
Show Advanced Settings / Hide Advanced SettingsClick this button to display a greater or lesser number of configuration fields.
General Settings
Enable Interface Select this option to turn on this interface.
Interface Properties
Interface Name Select a name for the interface.
ZoneSelect the zone to which you want the cellular interface to belong. The zone determines the security settings the Zyxel Device uses for the interface.
Extension SlotThis is the USB slot that you are configuring for use with a mobile broadband card.
Connected DeviceThis displays the manufacturer and model name of your mobile broadband card if you inserted one in the Zyxel Device. Otherwise, it displays none.
DescriptionEnter a description of this interface. You can use alphanumeric and ( ) +/ := ? ! * #@_ % - characters, and it can be up to 60 characters long. Spaces are allowed, but the string can't start with a space.
Connectivity
Nailed-UpSelect this if the connection should always be up. Clear this to have the Zyxel Device to establish the connection only when there is traffic. You might not nail up the connection if there is little traffic through the interface or if it costs money to keep the connection available.
Idle timeoutThis value specifies the time in seconds (0~360) that elapses before the Zyxel Device automatically disconnects from the ISP's server. Zero disables the idle timeout.
ISP Settings
Profile SelectionSelect Device to use one of the mobile broadband device's profiles of device settings. Then select the profile (use Profile 1 unless your ISP instructed you to do otherwise).Select Custom to configure your device settings yourself.
APNThis field is read-only if you selected Device in the profile selection. Select Custom in the profile selection to be able to manually input the APN (Access Point Name) provided by your service provider. This field applies with a GSM or HSDPA mobile broadband card. Enter the APN from your service provider. Connections with different APNs may provide different services (such as Internet access or MMS (Multi-Media Messaging Service)) and charge method.You can enter up to 63 ASCII printable characters. Spaces are allowed.
Dial StringEnter the dial string if your ISP provides a string, which would include the APN, to initialize the mobile broadband card.You can enter up to 63 ASCII printable characters. Spaces are allowed.This field is available only when you insert a GSM mobile broadband card.
Authentication TypeThe Zyxel Device supports PAP (Password Authentication Protocol) and CHAP (Challenge Handshake Authentication Protocol). CHAP is more secure than PAP; however, PAP is readily available on more platforms.Use the drop-down list box to select an authentication protocol for outgoing calls. Options are:None: No authentication for outgoing calls.CHAP - Your Zyxel Device accepts CHAP requests only.PAP - Your Zyxel Device accepts PAP requests only.
User NameThis field displays when you select an authentication type other than None. This field is read-only if you selected Device in the profile selection. If this field is configurable, enter the user name for this mobile broadband card exactly as the service provider gave it to you.You can use 1 ~ 64 alphanumeric and #:%-_@./ characters. The first character must be alphanumeric or -_@./. Spaces are not allowed.
PasswordThis field displays when you select an authentication type other than None. This field is read-only if you selected Device in the profile selection and the password is included in the mobile broadband card's profile. If this field is configurable, enter the password for this SIM card exactly as the service provider gave it to you.You can use 0 ~ 63 alphanumeric and ~!@#%^&*()_-+={}|;:'<,>./ characters.Spaces are not allowed.
Retype to ConfirmThis field displays when you select an authentication type other than None. This field is read-only if you selected Device in the profile selection and the password is included in the mobile broadband card's profile. If this field is configurable, re-enter the password for this SIM card exactly as the service provider gave it to you.
SIM Card Setting
PIN CodeThis field displays with a GSM or HSDPA mobile broadband card. A PIN (Personal Identification Number) code is a key to a mobile broadband card. Without the PIN code, you cannot use the mobile broadband card.Enter the 4-digit PIN code (0000 for example) provided by your ISP. If you enter the PIN code incorrectly, the mobile broadband card may be blocked by your ISP and you cannot use the account to access the Internet.If your ISP disabled PIN code authentication, enter an arbitrary number.
Retype to ConfirmType the PIN code again to confirm it.
Interface Parameters
Egress BandwidthEnter the maximum amount of traffic, in kilobits per second, the Zyxel Device can send through the interface to the network. Allowed values are 0 - 1048576. This setting is used in WAN load balancing and bandwidth management.
Ingress BandwidthThis is reserved for future use.Enter the maximum amount of traffic, in kilobits per second, the Zyxel Device can receive from the network through the interface. Allowed values are 0 - 1048576.
MTUMaximum Transmission Unit. Type the maximum size of each data packet, in bytes, that can move through this interface. If a larger packet arrives, the Zyxel Device divides it into smaller fragments. Allowed values are 576 - 1492. Usually, this value is 1492.
Connectivity CheckThe interface can regularly check the connection to the gateway you specified to make sure it is still available. You specify how often the interface checks the connection, how long to wait for a response before the attempt is a failure, and how many consecutive failures are required before the Zyxel Device stops routing to the gateway. The Zyxel Device resumes routing to the gateway the first time the gateway passes the connectivity check.
Enable Connectivity CheckSelect this to turn on the connection check.
Check Method SelectSelect the method that the gateway allows.Select icmp to have the Zyxel Device regularly ping the gateway you specify to make sure it is still available.Select tcp to have the Zyxel Device regularly perform a TCP handshake with the gateway you specify to make sure it is still available.
Check PeriodEnter the number of seconds between connection check attempts.
Check TimeoutEnter the number of seconds to wait for a response before the attempt is a failure.
Check Fail ToleranceEnter the number of consecutive failures before the Zyxel Device stops routing through the gateway.
Check Default GatewaySelect this to use the default gateway for the connectivity check.
Check this addressSelect this to specify a domain name or IP address for the connectivity check. Enter that domain name or IP address in the field next to it.
Check PortThis field only displays when you set the Check Method to tcp. Specify the port number to use for a TCP connectivity check.
Related Setting
Configure WAN TRUNKClick WAN TRUNK to go to a screen where you can configure the interface as part of a WAN trunk for load balancing.
Configure Policy RouteClick Policy Route to go to the policy route summary screen where you can configure a policy route to override the default routing and SNAT behavior for the interface.
IP Address Assignment
Get AutomaticallySelect this option If your ISP did not assign you a fixed IP address. This is the default selection.
Use Fixed IP AddressSelect this option If the ISP assigned a fixed IP address.
IP Address AssignmentEnter the cellular interface's WAN IP address in this field if you selected Use Fixed IP Address.
MetricEnter the priority of the gateway (if any) on this interface. The Zyxel Device decides which gateway to use based on this priority. The lower the number, the higher the priority. If two or more gateways have the same priority, the Zyxel Device uses the one that was configured first.
Device Settings
Band SelectionThis field appears if you selected a mobile broadband device that allows you to select the type of network to use. Select the type of mobile broadband service for your mobile broadband connection. If you are unsure what to select, check with your mobile broadband service provider to find the mobile broadband service available to you in your region.Select auto to have the card connect to an available network. Choose this option if you do not know what networks are available.You may want to manually specify the type of network to use if you are charged differently for different types of network or you only have one type of network available to you.Select GPRS / EDGE (GSM) only to have this interface only use a 2.5G or 2.75G network (respectively). If you only have a GSM network available to you, you may want to select this so the Zyxel Device does not spend time looking for a WCDMA network.Select UMTS / HSDPA (WCDMA) only to have this interface only use a 3G or 3.5G network (respectively). You may want to do this if you want to make sure the interface does not use the GSM network.Select LTE only to have this interface only use a 4G LTE network. This option only appears when a USG dongle for 4G technology is inserted.
Network SelectionHome network is the network to which you are originally subscribed.Select Home to have the mobile broadband device connect only to the home network. If the home network is down, the Zyxel Device's mobile broadband Internet connection is also unavailable.Select Auto (Default) to allow the mobile broadband device to connect to a network to which you are not subscribed when necessary, for example when the home network is down or another mobile broadband base station's signal is stronger. This is recommended if you need continuous Internet connectivity. If you select this, you may be charged using the rate of a different network.
Budget Setup
Enable Budget ControlSelect this to set a monthly limit for the user account of the installed mobile broadband card. You can set a limit on the total traffic and/or call time. The Zyxel Device takes the actions you specified when a limit is exceeded during the month.
Time BudgetSelect this and specify the amount of time (in hours) that the mobile broadband connection can be used within one month. If you change the value after you configure and enable budget control, the Zyxel Device resets the statistics.
Data BudgetSelect this and specify how much downstream and/or upstream data (in Mega bytes) can be transmitted via the mobile broadband connection within one month.Select Download to set a limit on the downstream traffic (from the ISP to the Zyxel Device).Select Upload to set a limit on the upstream traffic (from the Zyxel Device to the ISP).Select Download/Upload to set a limit on the total traffic in both directions.If you change the value after you configure and enable budget control, the Zyxel Device resets the statistics.
Reset time and data budget counters onSelect the date on which the Zyxel Device resets the budget every month. If the date you selected is not available in a month, such as 30th or 31st, the Zyxel Device resets the budget on the last day of the month.
Reset time and data budget countersThis button is available only when you enable budget control in this screen.Click this button to reset the time and data budgets immediately. The count starts over with the mobile broadband connection's full configured monthly time and data budgets. This does not affect the normal monthly budget restart; so if you configured the time and data budget counters to reset on the second day of the month and you use this button on the first, the time and data budget counters will still reset on the second.
Actions when over budgetSpecify the actions the Zyxel Device takes when the time or data limit is exceeded.
LogSelect None to not create a log, Log to create a log, or Log-alert to create an alert log. If you select Log or Log-alert you can also select recurring every to have the Zyxel Device send a log or alert for this event periodically. Specify how often (from 1 to 65535 minutes) to send the log or alert.
New connectionSelect Allow to permit new mobile broadband connections or Disallow to drop/block new mobile broadband connections.
Current connectionSelect Keep to maintain an existing mobile broadband connection or Drop to disconnect it. You cannot set New connection to Allow and Current connection to Drop at the same time.If you set New connection to Disallow and Current connection to Keep, the Zyxel Device allows you to transmit data using the current connection, but you cannot build a new connection if the existing connection is disconnected.
Actions when over % of time budget or % of data budgetSpecify the actions the Zyxel Device takes when the specified percentage of time budget or data limit is exceeded. Enter a number from 1 to 99 in the percentage fields. If you change the value after you configure and enable budget control, the Zyxel Device resets the statistics.
LogSelect None to not create a log when the Zyxel Device takes this action, Log to create a log, or Log-alert to create an alert log. If you select Log or Log-alert you can also select recurring every to have the Zyxel Device send a log or alert for this event periodically. Specify how often (from 1 to 65535 minutes) to send the log or alert.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

9.7 Tunnel Interfaces

The Zyxel Device uses tunnel interfaces in Generic Routing Encapsulation (GRE), IPv6 in IPv4, and 6to4 tunnels.

GRE Tunneling

GRE tunnels encapsulate a wide variety of network layer protocol packet types inside IP tunnels. A GRE tunnel serves as a virtual point-to-point link between the Zyxel Device and another router over an IPv4 network. At the time of writing, the Zyxel Device only supports GRE tunneling in IPv4 networks.

Figure 198 GRE Tunnel Example
ZYXEL USGFLEX700-GB0101F - GRE Tunneling - 1

flowchart
graph LR
    A["LAN"] --> B["Router"]
    B --> C["IPv4"]
    C --> D["Client 1"]
    C --> E["Client 2"]
    C --> F["Client 3"]
    C --> G["Client 4"]
    style C fill:#90EE90,stroke:#333

IPv6 Over IPv4 Tunnels

To route traffic between two IPv6 networks over an IPv4 network, an IPv6 over IPv4 tunnel has to be used.

Figure 199 IPv6 over IPv4 Network
ZYXEL USGFLEX700-GB0101F - IPv6 Over IPv4 Tunnels - 1

flowchart
graph LR
    A["IPv6"] --> B["IPv4"]
    B --> C["IPv6"]
    C -->|Orange arrow| B

On the Zyxel Device, you can either set up a manual IPv6-in-IPv4 tunnel or an automatic 6to4 tunnel. The following describes each method:

IPv6-in-IPv4 Tunneling

Use this mode on the WAN of the Zyxel Device if

- your Zyxel Device has a public IPv4 IP address given from your ISP,

and

- you want to transmit your IPv6 packets to one and only one remote site whose LAN network is also an IPv6 network.

With this mode, the Zyxel Device encapsulates IPv6 packets within IPv4 packets across the Internet. You must know the WAN IP address of the remote gateway device. This mode is normally used for a site-to-site application such as two branch offices.

Figure 200 IPv6-in-IPv4 Tunnel
ZYXEL USGFLEX700-GB0101F - IPv6-in-IPv4 Tunneling - 1

flowchart
graph LR
    A["IPv6"] --> B["Router"]
    B --> C["IPv4"]
    C --> D["IPv4"]
    D --> E["IPv6"]
    style A fill:#cce5ff,stroke:#333
    style B fill:#ffcccc,stroke:#333
    style C fill:#99ccff,stroke:#333
    style D fill:#66ccff,stroke:#333
    style E fill:#cce5ff,stroke:#333

In the Zyxel Device, you must also manually configure a policy route for an IPv6-in-IPv4 tunnel to make the tunnel work.

6to4 Tunneling

This mode also enables IPv6 packets to cross IPv4 networks. Unlike IPv6-in-IPv4 tunneling, you do not need to configure a policy route for a 6to4 tunnel. Through your properly pre-configuring the destination router's IP address in the IP address assignments to hosts, the Zyxel Device can automatically forward 6to4 packets to the destination they want to go. A 6to4 relay router is required to route 6to4 packets to a native IPv6 network if the packet's destination do not match your specified criteria.

In this mode, the Zyxel Device should get a public IPv4 address for the WAN. The Zyxel Device adds an IPv4 IP header to an IPv6 packet when transmitting the packet to the Internet. In reverse, the Zyxel Device removes the IPv4 header from an IPv6 packet when receiving it from the Internet.

An IPv6 address using the 6to4 mode consists of an IPv4 address, the format is as the following:

2002:[a public IPv4 address in hexadecimal]::/48

For example, a public IPv4 address is 202.156.30.41. The converted hexadecimal IP string is ca.9c.1Ee.29. The IPv6 address prefix becomes 2002:ca9c:1e29::/48.

Figure 201 6to4 Tunnel
ZYXEL USGFLEX700-GB0101F - 6to4 Tunneling - 1

flowchart
graph TD
    A["IPv6"] --> B["Internet"]
    C["IPv4"] --> B
    D["IPv6"] --> E["IPv6"]
    F["IPv6"] --> G["IPv6"]
    style B fill:#90EE90,stroke:#333
    style E fill:#90EE90,stroke:#333
    style G fill:#90EE90,stroke:#333

9.7.1 Configuring a Tunnel

This screen lists the Zyxel Device's configured tunnel interfaces. To access this screen, click Network >Interface >Tunnel.

Figure 202 Network > Interface > Tunnel
Port Role Ethernel PPP Cellular Tunnel VLAN Bridge Vik Trunk Configuration Add Edit Remove Activate Inactivate References Sha... Name IP Address Tunnel Mode My Address Remote Gateway A... 1 tunnel1 172.16.1.2/24 GRE wan2 (0.0.0.0) 10.1.23.45 Page 1 of 1 Show 50 Items Displaying 1 - 1 of 1 Apply Reset

Each field is explained in the following table.

Table 111 Network > Interface > Tunnel

LABEL DESCRIPTION
Add Click this to create a new GRE tunnel interface.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry. See Section 9.4.4 on page 255 for an example.
# This field is a sequential value, and it is not associated with any interface.
StatusThe activate (light bulb) icon is lit when the entry is active and dimmed when the entry is inactive.
Name This field displays the name of the interface.
IP AddressThis is the IP address of the interface. If the interface is active (and connected), the Zyxel Device tunnels local traffic sent to this IP address to the Remote Gateway Address.
Tunnel ModeThis is the tunnel mode of the interface (GRE, IPv6-in-IPv4 or 6to4). This field also displays the interface's IPv4 IP address and subnet mask if it is a GRE tunnel. Otherwise, it displays the interface's IPv6 IP address and prefix length.
My AddressThis is the interface or IP address uses to identify itself to the remote gateway. The Zyxel Device uses this as the source for the packets it tunnels to the remote gateway.
Remote Gateway AddressThis is the IP address or domain name of the remote gateway to which this interface tunnels traffic.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to begin configuring this screen afresh.

9.7.2 Tunnel Add or Edit Screen

This screen lets you configure a tunnel interface. Click Configuration > Network > Interface > Tunnel > Add (or Edit) to open the following screen.

Figure 203 Network > Interface > Tunnel > Add/Edit
Add corresponding Hide Advanced Settings General Settings Enable Interface Properties Interface Name: tunnel Zone: TUNNEL Tunnel Mode: GRE IP Address Assignment IP Address: 0.0.0.0 Subnet Mask: 0.0.0.0 Metric: 0 (0-15) Gateway Settings My Address Interface wan1_ppp Dynamic -- 0.0.0.0/0.0.0.0 IP Address 0.0.0.0 Remote Gateway Address: Interface Parameters Egress Bandwidth: 1048576 Kbps Advance Ingress Bandwidth: 1048576 Kbps MTU: 1476 Bytes Connectivity Check Enable Connectivity Check Check Method: icmp Check Period: 30 (5-600 seconds) Check Timeout: 5 (1-10 seconds) Check Fail Tolerance: 5 (1-10) Check this address: (Domain Name or IP Address) Related Setting Configure WAN TRUNK Configure Policy Route OK Cancel

Each field is explained in the following table.

Table 112 Network > Interface > Tunnel > Add/Edit

LABEL DESCRIPTION
Show Advanced Settings / Hide Advanced SettingsClick this button to display a greater or lesser number of configuration fields.
General Settings
EnableSelect this to enable this interface. Clear this to disable this interface.
Interface Properties
Interface NameThis field is read-only if you are editing an existing tunnel interface. Enter the name of the tunnel interface. The format is tunnelx, where x is 0 - 3. For example, tunnel0.
ZoneUse this field to select the zone to which this interface belongs. This controls what security settings the Zykel Device applies to this interface.
Tunnel ModeSelect the tunneling protocol of the interface (GRE, IPv6-in-IPv4 or 6to4). See Section 9.7 on page 274 for more information.
IP Address AssignmentThis section is available if you are configuring a GRE tunnel.
IP Address Enter the IP address for this interface.
Subnet MaskEnter the subnet mask of this interface in dot decimal notation. The subnet mask indicates what part of the IP address is the same for all computers on the network.
MetricEnter the priority of the gateway (if any) on this interface. The Zykel Device decides which gateway to use based on this priority. The lower the number, the higher the priority. If two or more gateways have the same priority, the Zykel Device uses the one that was configured first.
IPv6 Address AssignmentThis section is available if you are configuring an IPv6-in-IPv4 or a 6to4 tunnel.
IPv6 Address/ Prefix LengthEnter the IPv6 address and the prefix length for this interface if you want to use a static IP address. This field is optional.The prefix length indicates what the left-most part of the IP address is the same for all computers on the network, that is, the network address.
MetricEnter the priority of the gateway (if any) on this interface. The Zykel Device decides which gateway to use based on this priority. The lower the number, the higher the priority. If two or more gateways have the same priority, the Zykel Device uses the one that was configured first.
6to4 Tunnel ParameterThis section is available if you are configuring a 6to4 tunnel which encapsulates IPv6 to IPv4 packets.
6to4 PrefixEnter the IPv6 prefix of a destination network. The Zykel Device forwards IPv6 packets to the hosts on the matched network.If you enter a prefix starting with 2002, the Zykel Device will forward the matched packets to the IPv4 IP address converted from the packets' destination address. The IPv4 IP address can be converted from the next 32 bits after the prefix you specified in this field. See 6to4 Tunneling on page 275 for an example. The Zykel Device forwards the unmatched packets to the specified Relay Router.
Relay RouterEnter the IPv4 address of a 6to4 relay router which helps forward packets between 6to4 networks and native IPv6 networks.
Remote Gateway PrefixEnter the IPv4 network address and network bits of a remote 6to4 gateway, for example, 14.15.0.0/16.This field works if you enter a 6to4 Prefix not starting with 2002 (2003 for example). The Zykel Device forwards the matched packets to a remote gateway with the network address you specify here, and the bits converted after the 6to4 Prefix in the packets.For example, you configure the 6to4 prefix to 2003:A0B::/32 and the remote gateway prefix to 14.15.0.0/16. If a packet's destination is 2003:A0B:1011:5::8, the Zykel Device forwards the packet to 14.15.16.17, where the network address is 14.15.0.0 and the host address is the remain bits converted from 1011 after the packet's 6to4 prefix (2003:A0B).
Gateway Settings
My AddressSpecify the interface or IP address to use as the source address for the packets this interface tunnels to the remote gateway. The remote gateway sends traffic to this interface or IP address.
Remote Gateway AddressEnter the IP address or domain name of the remote gateway to which this interface tunnels traffic.Automatic displays in this field if you are configuring a 6to4 tunnel. It means the 6to4 tunnel will help forward packets to the corresponding remote gateway automatically by looking at the packet's destination address.
Interface Parameters
Egress BandwidthEnter the maximum amount of traffic, in kilobits per second, the Zyxel Device can send through the interface to the network. Allowed values are 0 - 1048576. This setting is used in WAN load balancing and bandwidth management.
Ingress BandwidthThis is reserved for future use.Enter the maximum amount of traffic, in kilobits per second, the Zyxel Device can receive from the network through the interface. Allowed values are 0 - 1048576.
MTUMaximum Transmission Unit. Type the maximum size of each data packet, in bytes, that can move through this interface. If a larger packet arrives, the Zyxel Device divides it into smaller fragments. Allowed values are 576 - 1500. Usually, this value is 1500.
Connectivity Check This section is available if you are configuring a GRE tunnel.The interface can regularly check the connection to the gateway you specified to make sure it is still available. You specify how often the interface checks the connection, how long to wait for a response before the attempt is a failure, and how many consecutive failures are required before the Zyxel Device stops routing to the gateway. The Zyxel Device resumes routing to the gateway the first time the gateway passes the connectivity check.
Enable Connectivity CheckSelect this to turn on the connection check.
Check Method Select the method that the gateway allows.Select icmp to have the Zyxel Device regularly ping the gateway you specify to make sure it is still available.Select tcp to have the Zyxel Device regularly perform a TCP handshake with the gateway you specify to make sure it is still available.
Check Period Enter the number of seconds between connection check attempts.
Check TimeoutEnter the number of seconds to wait for a response before the attempt is a failure.
Check Fail ToleranceEnter the number of consecutive failures before the Zyxel Device stops routing through the gateway.
Check Default GatewaySelect this to use the default gateway for the connectivity check.
Check this addressSelect this to specify a domain name or IP address for the connectivity check. Enter that domain name or IP address in the field next to it.
Check PortThis field displays when you set the Check Method to tcp. Specify the port number to use for a TCP connectivity check.
Related Setting
WAN TRUNKClick this link to go to a screen where you can configure WAN trunk load balancing.
Policy RouteClick this link to go to the screen where you can manually configure a policy route to associate traffic with this interface.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

9.8 VLAN Interfaces

A Virtual Local Area Network (VLAN) divides a physical network into multiple logical networks. The standard is defined in IEEE 802.1q.

Figure 204 Example: Before VLAN
ZYXEL USGFLEX700-GB0101F - VLAN Interfaces - 1

flowchart
graph TD
    A["Component A"] --> C1["Client Computer 1"]
    A --> C2["Client Computer 2"]
    A --> C3["Client Computer 3"]
    A --> C4["Client Computer 4"]
    C1 --> B["Client Computer 1"]
    C2 --> B
    C3 --> B
    C4 --> B

In this example, there are two physical networks and three departments A, B, and C. The physical networks are connected to hubs, and the hubs are connected to the router.

Alternatively, you can divide the physical networks into three VLANs.

Figure 205 Example: After VLAN
ZYXEL USGFLEX700-GB0101F - VLAN Interfaces - 2

flowchart
graph TD
    A["Host A"] -->|VLAN ID = 1| B["Monitor 1"]
    A -->|VLAN ID = 2| C["Monitor 2"]
    A -->|VLAN ID = 3| D["Monitor 3"]
    A -->|VLAN ID = 4| E["Monitor 4"]
    B --> F["Computer 1"]
    B --> G["Computer 2"]
    C --> H["Computer 3"]
    C --> I["Computer 4"]
    D --> J["Computer 5"]
    D --> K["Computer 6"]
    E --> L["Computer 7"]

Each VLAN is a separate network with separate IP addresses, subnet masks, and gateways. Each VLAN also has a unique identification number (ID). The ID is a 12-bit value that is stored in the MAC header. The VLANs are connected to switches, and the switches are connected to the router. (If one switch has enough connections for the entire network, the network does not need switches A and B.)

  • Traffic inside each VLAN is layer-2 communication (data link layer, MAC addresses). It is handled by the switches. As a result, the new switch is required to handle traffic inside VLAN 2. Traffic is only broadcast inside each VLAN, not each physical network.
  • Traffic between VLANs (or between a VLAN and another type of network) is layer-3 communication (network layer, IP addresses). It is handled by the router.

This approach provides a few advantages.

  • Increased performance - In VLAN 2, the extra switch should route traffic inside the sales department faster than the router does. In addition, broadcasts are limited to smaller, more logical groups of users.
  • Higher security - If each computer has a separate physical connection to the switch, then broadcast traffic in each VLAN is never sent to computers in another VLAN.

- Better manageability - You can align network policies more appropriately for users. For example, you can create different content filtering rules for each VLAN (each department in the example above), and you can set different bandwidth limits for each VLAN. These rules are also independent of the physical network, so you can change the physical network without changing policies.

In this example, the new switch handles the following types of traffic:

  • Inside VLAN 2.
  • Between the router and VLAN 1.
  • Between the router and VLAN 2.
  • Between the router and VLAN 3.

VLAN Interfaces Overview

In the Zyxel Device, each VLAN is called a VLAN interface. As a router, the Zyxel Device routes traffic between VLAN interfaces, but it does not route traffic within a VLAN interface. All traffic for each VLAN interface can go through only one Ethernet interface, though each Ethernet interface can have one or more VLAN interfaces.

Note: Each VLAN interface is created on top of only one Ethernet interface.

Otherwise, VLAN interfaces are similar to other interfaces in many ways. They have an IP address, subnet mask, and gateway used to make routing decisions. They restrict bandwidth and packet size. They can provide DHCP services, and they can verify the gateway is available.

9.8.1 VLAN Summary Screen

This screen lists every VLAN interface and virtual interface created on top of VLAN interfaces. If you enabled IPv6 on the Configuration > System > IPv6 screen, you can also configure VLAN interfaces used for your IPv6 networks on this screen. To access this screen, click Configuration > Network > Interface > VLAN.

Figure 206 Configuration > Network > Interface > VLAN
Port Ethernet PPP Cellular Tunnel VLAN Bridge VTI Trunk Configuration Add Edit Remove Activate Inactivate Create Virtual Interface References Sta... Name Description Port/VID IP Address Mask Page 0 of 0 Show 50 items No data to display IPv6 Configuration Add Edit Remove Activate Inactivate References Status Name Description Port/VID IP Address Page 0 of 0 Show 50 items No data to display Apply Reset

Each field is explained in the following table.

Table 113 Configuration > Network > Interface > VLAN

LABEL DESCRIPTION
Configuration / IPv6 ConfigurationUse theConfigurationsection for IPv4 network settings. Use theIPv6Configurationsection for IPv6 network settings if you connect your Zyxel Device to an IPv6 network. Both sections have similar fields as described below.
EditDouble-click an entry or select it and clickEditto open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and clickRemove.The Zyxel Device confirms you want to remove it before doing so.
ActivateTo turn on an entry, select it and clickActivate.
InactivateTo turn off an entry, select it and clickInactivate.
Create Virtual InterfaceTo open the screen where you can create a virtual interface, select an interface and clickCreateVirtual Interface.
ReferencesSelect an entry and clickReferencesto open a screen that shows which settings use the entry.SeeSection 9.4.4 on page 255for an example.
#This field is a sequential value, and it is not associated with any interface.
StatusThis icon is lit when the entry is active and dimmed when the entry is inactive.
Name This fielddisplays the name of the interface.
DescriptionThis field displays the description of the interface.
Port/VID For VLAN interfaces, this field displaysthe Ethernet interface on which the VLAN interface is createdthe V LAN IDFor virtual interfaces, this field is blank.
IP AddressThis field displays the current IP address of the interface. If the IP address is 0.0.0.0, the interface does not have an IP address yet.This screen also shows whether the IP address is a static IP address (STATIC) or dynamically assigned (DHCP). IP addresses are always static in virtual interfaces.
MaskThis field displays the interface's subnet mask in dot decimal notation.
ApplyClickApplyto save your changes back to the Zyxel Device.
ResetClickResetto return the screen to its last-saved settings.

9.8.2 VLAN Add/Edit

Select an existing entry on the previous screen and click Edit or click Add to create a new entry. The following screen appears.

Figure 207 Configuration > Network > Interface > VLAN > Add /Edit
Add VLAN IPv4/IPv6 View ▼ Hide Advanced Settings Create New Object General Settings Enable Interface General IPv6 Setting Enable IPv6 Interface Properties Interface Type: general 1 Interface Name: vlan 1 Zone: LAN1 1 Base Port: sfp VLAN ID: (1-4094) Advance Priority Code: D (0-7) Description: (Optional) IP Address Assignment Get Automatically Advance DHCP Option 40: (Optional) Use Fixed IP Address IP Address: 0.0.0.0 Subnet Mask: 0.0.0.0 (Optional) Gateway: Metric: 0 (0-15) Enable IGMP Support IGMP Upstream IGMP Downstream IPv6 Address Assignment Enable Stateless Address Auto-configuration (SLAAC) Link-Local Address: n/a IPv6 Address/Prefix Length: (Optional) Advance Gateway: (Optional) Metric: (0-15) Address from DHCPv6 Prefix Delegation Add Edit Remove References Delegated Prefix Suffix Address Address Page 0 of 0 Show 50 Items No data to display DHCPv6 Setting DHCPv6: N/A IPv6 Router Advertisement Setting Enable Router Advertisement Advance Advertised Hosts Get Network Configuration From DHCPv6 Advertised Hosts Get Other Configuration From DHCPv6

Router Preference: Medium Advance MTU: 1480 (1280-1500) Hop Limit: 64 (1-255) Advertised Prefix Table Add Edit Remove IPv6 Address/Prefix Length Page 0 of 0 Show 50 Items No data to display Advance Advertised Prefix from DHCPv6 Prefix Delegation Add Edit Remove References Delegated Prefix Suffix Address Address Page 0 of 0 Show 50 Items No data to display Interface Parameters Egress Bandwidth: 1048576 Kbps Advance Ingress Bandwidth: 1048576 Kbps MTU: 1500 Bytes Connectivity Check Enable Connectivity Check Check Method: icmp Check Period: 30 (5-600 seconds) Check Timeout: 5 (1-10 seconds) Check Fall Tolerance: 5 (1-10) Check Default Gateway 0.0.0.0 Check These Addresses [Domain Name or IP Address] (Optional) Probe Succeeds When: any one respond(s) DHCP Setting DHCP: None Enable IP/MAC Binding Enable Logs for IP/MAC Binding Violation Static DHCP Table Add Edit Remove IP Address MAC Description Page 0 of 0 Show 50 Items No data to display Advance RIP Setting Enable RIP Direction: BIDir Send Version: 2 Receive Version: 2 V2-Broadcast OSPF Setting Area: none Priority: 1 (0-255) Link Cost: 10 (1-65535) Passive Interface Authentication: None

MAC Address Setting Use Default MAC Address 00:00:00:00:00:00 Overwrite Default MAC Address Proxy ARP Enable Proxy ARP Add Remove IP Address Page 0 of 0 Show 50 items No data to display Related Setting Configure WAN_TRUNK Configure Policy Route OK Cancel

Each field is explained in the following table.

Table 114 Configuration > Network > Interface > VLAN > Add / Edit

LABEL DESCRIPTION
IPv4/IPv6 View / IPv4 View / IPv6 ViewUse this button to display both IPv4 and IPv6, IPv4-only, or IPv6-only configuration fields.
Show Advanced Settings / Hide Advanced SettingsClick this button to display a greater or lesser number of configuration fields.
Create New ObjectClick this button to create a DHCPv6 lease or DHCPv6 request object that you may use for the DHCPv6 settings in this screen.
General Settings
Enable Interface Select this to turn this interface on. Clear this to disable this interface.
General IPv6 Setting
Enable IPv6Select this to enable IPv6 on this interface. Otherwise, clear this to disable it.
Interface Properties
Interface TypeSelect one of the following option depending on the type of network to which the Zyxel Device is connected or if you want to additionally manually configure some related settings.internalis for connecting to a local network. Other corresponding configuration options: DHCP server and DHCP relay. The Zyxel Device automatically adds default SNAT settings for traffic flowing from this interface to an external interface.externalis for connecting to an external network (like the Internet). The Zyxel Device automatically adds this interface to the default WAN trunk.For general, the rest of the screen's options do not automatically adjust and you must manually configure a policy route to add routing and SNAT settings for the interface.
Interface NameThis field is read-only if you are editing an existing VLAN interface. Enter the number of the VLAN interface. You can use a number from 0~4094. For example, use vlan0, vlan8, and so on. The total number of VLANs you can configure on the Zyxel Device depends on the model.
Zone Select the zone to which the VLAN interface belongs.
Base PortSelect the Ethernet interface on which the VLAN interface runs.
VLAN IDEnter the VLAN ID. This 12-bit number uniquely identifies each VLAN. Allowed values are 1 - 4094. (0 and 4095 are reserved.)
Priority CodeThis is a 3-bit field within a 802.1Q VLAN tag that's used to prioritize associated outgoing VLAN traffic. "0" is the lowest priority level and "7" is the highest. See Table 188 on page 472. The setting configured inConfiguration > BWMoverwrites the priority setting here.
DescriptionEnter a description of this interface. You can use alphanumeric and ( ) +/ : = ? ! *#@_ % - characters, and it can be up to 60 characters long. Spaces are allowed, but the string can't start with a space.
IP Address Assignment
Get AutomaticallySelect this if this interface is a DHCP client. In this case, the DHCP server configures the IP address, subnet mask, and gateway automatically.You should not select this if the interface is assigned to a VRRP group.
DHCP Option 60DHCP Option 60 is used by the Zyxel Device for identification to the DHCP server using the VCI (Vendor Class Identifier) on the DHCP server. The Zyxel Device adds it in the initial DHCP discovery message that a DHCP client broadcasts in search of an IP address. The DHCP server can assign different IP addresses or options to clients with the specific VCI or reject the request from clients without the specific VCI.Type a string using up to 63 of these characters [a-zA-Z0-9!\"#%&\'()*+,-./::<=>@ \\ ^_{}] to identify this Zyxel Device to the DHCP server. For example, Zyxel-TW.
Use Fixed IP AddressSelect this if you want to specify the IP address, subnet mask, and gateway manually.
IP AddressThis field is enabled if you selectUse Fixed IP Address.Enter the IP address for this interface.
Subnet MaskThis field is enabled if you selectUse Fixed IP Address.Enter the subnet mask of this interface in dot decimal notation. The subnet mask indicates what part of the IP address is the same for all computers on the network.
GatewayThis field is enabled if you selectUse Fixed IP Address.Enter the IP address of the gateway. The Zyxel Device sends packets to the gateway when it does not know how to route the packet to its destination. The gateway should be on the same network as the interface.
MetricEnter the priority of the gateway (if any) on this interface. The Zyxel Device decides which gateway to use based on this priority. The lower the number, the higher the priority. If two or more gateways have the same priority, the Zyxel Device uses the one that was configured first.
Enable IGMP SupportSelect this to allow the Zyxel Device to act as an IGMP proxy for hosts connected on the IGMP downstream interface.
IGMP UpstreamEnableIGMP Upstreamon the interface which connects to a router running IGMP that is closer to the multicast server.
IGMP DownstreamEnableIGMP Downstreamon the interface which connects to the multicast hosts.
IPv6 Address AssignmentThese IP address fields configure an IPv6 IP address on the interface itself.
Enable Stateless Address Auto-configuration (SLAAC)Select this to enable IPv6 stateless auto-configuration on this interface. The interface will generate an IPv6 IP address itself from a prefix obtained from an IPv6 router on the network.
Link-Local addressThis displays the IPv6 link-local address and the network prefix that the Zyxel Device generates itself for the interface.
IPv6 Address/ Prefix LengthEnter the IPv6 address and the prefix length for this interface if you want to configure a static IP address for this interface. This field is optional.The prefix length indicates what the left-most part of the IP address is the same for all computers on the network, that is, the network address.
Gateway Enter theIPv6 address of the default outgoing gateway using colon (:) hexadecimal notation.
MetricEnter the priority of the gateway (if any) on this interface. The Zyxel Device decides which gateway to use based on this priority. The lower the number, the higher the priority. If two or more gateways have the same priority, the Zyxel Device uses the one that was configured first.
Address from DHCPv6 Prefix DelegationUse this table to have the Zyxel Device obtain an IPv6 prefix from the ISP or a connected uplink router for an internal network, such as the LAN or DMZ. You have to also enter a suffix address which is appended to the delegated prefix to form an address for this interface.See Prefix Delegation on page 232 for more information.To use prefix delegation, you must:Create at least one DHCPv6 request object before configuring this table.The external interface must be a DHCPv6 client. You must configure the DHCPv6 request options using a DHCPv6 request object with the type of prefix-delegation.Assign the prefix delegation to an internal interface and enable router advertisement on that interface.
Add Click this to create an entry.
EditSelect an entry and click this to change the settings.
RemoveSelect an entry and click this to delete it from this table.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry. See Section 9.4.4 on page 255 for an example.
# This field is a sequential value, and it is not associated with any entry.
Delegated PrefixSelect the DHCPv6 request object to use from the drop-down list.
Suffix AddressEnter the ending part of the IPv6 address, a slash (/), and the prefix length. The Zyxel Device will append it to the delegated prefix.For example, you got a delegated prefix of 2003:1234:5678/48. You want to configure an IP address of 2003:1234:5678:1111::1/128 for this interface, then enter :1111:0:0:0:1/128 in this field.
Address This field displays the combined IPv6 IP address for this interface.Note: This field displays the combined address after you click OK and reopen this screen.
DHCPv6 Setting
DHCPv6Select N/A to not use DHCPv6.Select Client to set this interface to act as a DHCPv6 client.Select Server to set this interface to act as a DHCPv6 server which assigns IP addresses and provides subnet mask, gateway, and DNS server information to clients.Select Relay to set this interface to route DHCPv6 requests to the DHCPv6 relay server you specify. The DHCPv6 server(s) may be on another network.
DUIDThis field displays the DHCP Unique IDentifier (DUID) of the interface, which is unique and used for identification purposes when the interface is exchanging DHCPv6 messages with others. See DHCPv6 on page 233 for more information.
DUID as MACSelect this to have the DUID generated from the interface's default MAC address.
Customized DUID if you want to use a customized DUID, enter it here for the interface.
Enable Rapid CommitSelect this to shorten the DHCPv6 message exchange process from four to two steps. This function helps reduce heavy network traffic load.Note: Make sure you also enable this option in the DHCPv6 clients to make rapid commit work.
Information Refresh TimeEnter the number of seconds a DHCPv6 client should wait before refreshing information retrieved from DHCPv6.
Request AddressThis field is available if you set this interface to DHCPv6 Client. Select this to get an IPv6 IP address for this interface from the DHCP server. Clear this to not get any IP address information through DHCPv6.
DHCPv6 Request Options / DHCPv6 Lease OptionsIf this interface is a DHCPv6 client, use this section to configure DHCPv6 request settings that determine what additional information to get from the DHCPv6 server.If this interface is a DHCPv6 server, use this section to configure DHCPv6 lease settings that determine what to offer to the DHCPv6 clients.
AddClick this to create an entry in this table. See Section 9.4.5 on page 256 for more information.
RemoveSelect an entry and click this to delete it from this table.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry. See Section 9.4.4 on page 255 for an example.
# This field is a sequential value, and it is not associated with any entry.
Name This field displays the name of the DHCPv6 request or lease object.
Type This field displays the type of the object.
ValueThis field displays the IPv6 prefix that the Zyxel Device obtained from an uplink router (Server is selected) or will advertise to its clients (Client is selected).
InterfaceWhen Relay is selected, select this check box and an interface from the drop-down list if you want to use it as the relay server.
Relay ServerWhen Relay is selected, select this check box and enter the IP address of a DHCPv6 server as the relay server.
IPv6 Router Advertisement Setting
Enable Router AdvertisementSelect this to enable this interface to send router advertisement messages periodically. See IPv6 Router Advertisement on page 232 for more information.
Advertised Hosts Get Network Configuration From DHCPv6Select this to have the Zyxel Device indicate to hosts to obtain network settings (such as prefix and DNS settings) through DHCPv6.Clear this to have the Zyxel Device indicate to hosts that DHCPv6 is not available and they should use the prefix in the router advertisement message.
Advertised Hosts Get Other Configuration From DHCPv6Select this to have the Zyxel Device indicate to hosts to obtain DNS information through DHCPv6.Clear this to have the Zyxel Device indicate to hosts that DNS information is not available in this network.
Router PreferenceSelect the router preference (Low, Medium or High) for the interface. The interface sends this preference in the router advertisements to tell hosts what preference they should use for the Zyxel Device. This helps hosts to choose their default router especially when there are multiple IPv6 router on the network.Note: Make sure the hosts also support router preference to make this function work.
MTUThe Maximum Transmission Unit. Type the maximum size of each IPv6 data packet, in bytes, that can move through this interface. If a larger packet arrives, the Zyxel Device divides it into smaller fragments.
Hop LimitEnter the maximum number of network segments that a packet can cross before reaching the destination. When forwarding an IPv6 packet, IPv6 routers are required to decrease the Hop Limit by 1 and to discard the IPv6 packet when the Hop Limit is 0.
Advertised Prefix TableConfigure this table only if you want the Zyxel Device to advertise a fixed prefix to the network.
Add Click this to create an IPv6 prefix address.
EditSelect an entry in this table and click this to modify it.
RemoveSelect an entry in this table and click this to delete it.
# This field is a sequential value, and it is not associated with any entry.
IPv6 Address/ Prefix LengthEnter the IPv6 network prefix address and the prefix length.The prefix length indicates what the left-most part of the IP address is the same for all computers on the network, that is, the network address.
Advertised Prefix from DHCPv6 Prefix DelegationUse this table to configure the network prefix if you want to use a delegated prefix as the beginning part of the network prefix.
Add Click this to create an entry in this table.
EditSelect an entry in this table and click this to modify it.
RemoveSelect an entry in this table and click this to delete it.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry. See Section 9.4.4 on page 255 for an example.
# This field is a sequential value, and it is not associated with any entry.
Delegated PrefixSelect the DHCPv6 request object to use for generating the network prefix for the network.
Suffix AddressEnter the ending part of the IPv6 network address plus a slash (/) and the prefix length. The Zyxel Device will append it to the selected delegated prefix. The combined address is the network prefix for the network.For example, you got a delegated prefix of 2003:1234:5678/48. You want to divide it into 2003:1234:5678:1111/64 for this interface and 2003:1234:5678:2222/64 for another interface. You can use ::1111/64 and ::2222/64 for the suffix address respectively. But if you do not want to divide the delegated prefix into subnetworks, enter ::0/48 here, which keeps the same prefix length (/48) as the delegated prefix.
AddressThis is the final network prefix combined by the delegated prefix and the suffix.Note: This field displays the combined address after you click OK and reopen this screen.
Interface Parameters
Egress BandwidthEnter the maximum amount of traffic, in kilobits per second, the Zyxel Device can send through the interface to the network. Allowed values are 0 - 1048576.
Ingress BandwidthThis is reserved for future use.Enter the maximum amount of traffic, in kilobits per second, the Zyxel Device can receive from the network through the interface. Allowed values are 0 - 1048576.
MTUMaximum Transmission Unit. Type the maximum size of each data packet, in bytes, that can move through this interface. If a larger packet arrives, the Zyxel Device divides it into smaller fragments. Allowed values are 576 - 1500. Usually, this value is 1500.
Connectivity CheckThe Zyxel Device can regularly check the connection to the gateway you specified to make sure it is still available. You specify how often to check the connection, how long to wait for a response before the attempt is a failure, and how many consecutive failures are required before the Zyxel Device stops routing to the gateway. The Zyxel Device resumes routing to the gateway the first time the gateway passes the connectivity check.
Enable Connectivity CheckSelect this to turn on the connection check.
Check Method Select the method that the gateway allows.Select icmp to have the Zyxel Device regularly ping the gateway you specify to make sure it is still available.Select tcp to have the Zyxel Device regularly perform a TCP handshake with the gateway you specify to make sure it is still available.
Check Period Enter the number of seconds between connection check attempts.
Check TimeoutEnter the number of seconds to wait for a response before the attempt is a failure.
Check Fail ToleranceEnter the number of consecutive failures before the Zyxel Device stops routing through the gateway.
Check Default GatewaySelect this to use the default gateway for the connectivity check.
Check this addressSelect this to specify a domain name or IP address for the connectivity check. Enter that domain name or IP address in the field next to it.
Check PortThis field only displays when you set the Check Method to tcp. Specify the port number to use for a TCP connectivity check.
Check these addressesType one or two domain names or IP addresses for the connectivity check.
Probe Succeeds WhenThis field applies when you specify two domain names or IP addresses for the connectivity check.Select any one if you want the check to pass if at least one of the domain names or IP addresses responds.Select all if you want the check to pass only if both domain names or IP addresses respond.
DHCP SettingThe DHCP settings are available for the OPT, LAN and DMZ interfaces.
DHCPSelect what type of DHCP service the Zyxel Device provides to the network. Choices are: None - the Zyxel Device does not provide any DHCP services. There is already a DHCP server on the network.DHCP Relay - the Zyxel Device routes DHCP requests to one or more DHCP servers you specify. The DHCP server(s) may be on another network.DHCP Server - the Zyxel Device assigns IP addresses and provides subnet mask, gateway, and DNS server information to the network. The Zyxel Device is the DHCP server for the network.
These fields appear if the Zyxel Device is a DHCP Relay.
Relay Server 1 Enter the IP address of a DHCP server for the network.
Relay Server 2This field is optional. Enter the IP address of another DHCP server for the network.
These fields appear if the Zyxel Device is a DHCP Server.
IP Pool Start AddressEnter the IP address from which the Zyxel Device begins allocating IP addresses. If you want to assign a static IP address to a specific computer, click Add Static DHCP.If this field is blank, the Pool Size must also be blank. In this case, the Zyxel Device can assign every IP address allowed by the interface's IP address and subnet mask, except for the first address (network address), last address (broadcast address) and the interface's IP address.
Pool SizeEnter the number of IP addresses to allocate. This number must be at least one and is limited by the interface's Subnet Mask. For example, if the Subnet Mask is 255.255.255.0 and IP Pool Start Address is 10.10.10.10, the Zyxel Device can allocate 10.10.10.10 to 10.10.10.254, or 245 IP addresses.If this field is blank, the IP Pool Start Address must also be blank. In this case, the Zyxel Device can assign every IP address allowed by the interface's IP address and subnet mask, except for the first address (network address), last address (broadcast address) and the interface's IP address.
First DNS Server Second DNS Server Third DNS ServerSpecify the IP addresses up to three DNS servers for the DHCP clients to use. Use one of the following ways to specify these IP addresses.Custom Defined - enter a static IP address.From ISP - select the DNS server that another interface received from its DHCP server.Zyxel Device - the DHCP clients use the IP address of this interface and the Zyxel Device works as a DNS relay.
First WINS Server, Second WINS ServerType the IP address of the WINS (Windows Internet Naming Service) server that you want to send to the DHCP clients. The WINS server keeps a mapping table of the computer names on your network and the IP addresses that they are currently using.
Default RouterIf you set this interface to DHCP Server, you can select to use either the interface's IP address or another IP address as the default router. This default router will become the DHCP clients' default gateway.To use another IP address as the default router, select Custom Defined and enter the IP address.
Lease timeSpecify how long each computer can use the information (especially the IP address) before it has to request the information again. Choices are:infinite - select this if IP addresses never expiredays, hours, and minutes - select this to enter how long IP addresses are valid. The default is 2 days.
Extended OptionsThis table is available if you selected DHCP server.Configure this table if you want to send more information to DHCP clients through DHCP packets.
AddClick this to create an entry in this table. See Section 9.4.6 on page 257.
EditSelect an entry in this table and click this to modify it.
RemoveSelect an entry in this table and click this to delete it.
# This field is a sequential value, and it is not associated with any entry.
Name This is the option's name.
Code This is the option's code number.
Type This is the option's type.
Value This is the option's value.
Enable IP/MAC BindingSelect this option to have the Zyxel Device enforce links between specific IP addresses and specific MAC addresses for this VLAN. This stops anyone else from manually using a bound IP address on another device connected to this interface. Use this to make use only the intended users get to use specific IP addresses.
Enable Logs for IP/MAC Binding ViolationSelect this option to have the Zyxel Device generate a log if a device connected to this VLAN attempts to use an IP address that is bound to another device's MAC address.
Static DHCP TableConfigure a list of static IP addresses the Zyxel Device assigns to computers connected to the interface. Otherwise, the Zyxel Device assigns an IP address dynamically using the interface's IP Pool Start Address and Pool Size.
LABELDESCRIPTION
Add Click this to create a new entry.
Edit Select an entry and click this to be able to modify it.
Remove Select an entry and click this to delete it.
# This field is a sequential value, and it is not associated with a specific entry.
IP AddressEnter the IP address to assign to a device with this entry's MAC address.
MAC Address Enter the MAC address to which to assign this entry's IP address.
DescriptionEnter a description to help identify this static DHCP entry. You can use alphanumeric and () +/ := ? ! *#@$ _% - characters, and it can be up to 60 characters long.
RIP SettingSee Section 10.6 on page 337 for more information about RIP.
Enable RIP Select this to enable RIP on this interface.
DirectionThis field is effective when RIP is enabled. Select the RIP direction from the drop-down list box.BiDir - This interface sends and receives routing information.In-Only - This interface receives routing information.Out-Only - This interface sends routing information.
Send VersionThis field is effective when RIP is enabled. Select the RIP version(s) used for sending RIP packets. Choices are 1, 2, and 1 and 2.
Receive VersionThis field is effective when RIP is enabled. Select the RIP version(s) used for receiving RIP packets. Choices are 1, 2, and 1 and 2.
V2-BroadcastThis field is effective when RIP is enabled. Select this to send RIP-2 packets using subnet broadcasting; otherwise, the Zyxel Device uses multicasting.
OSPF SettingSee Section 10.7 on page 339 for more information about OSPF.
AreaSelect the area in which this interface belongs. Select None to disable OSPF in this interface.
PriorityEnter the priority (between 0 and 255) of this interface when the area is looking for a Designated Router (DR) or Backup Designated Router (BDR). The highest-priority interface identifies the DR, and the second-highest-priority interface identifies the BDR. Set the priority to zero if the interface can not be the DR or BDR.
Link CostEnter the cost (between 1 and 65,535) to route packets through this interface.
Passive InterfaceSelect this to stop forwarding OSPF routing information from the selected interface. As a result, this interface only receives routing information.
AuthenticationSelect an authentication method, or disable authentication. To exchange OSPF routing information with peer border routers, you must use the same authentication method that they use. Choices are:Same-as-Area - use the default authentication method in the areaNone - disable authenticationText - authenticate OSPF routing information using a plain-text passwordMD5 - authenticate OSPF routing information using MD5 encryption
Text Authentication KeyThis field is available if the Authentication is Text. Type the password for text authentication. The key can consist of alphanumeric characters and the underscore, and it can be up to 16 characters long.
MD5 Authentication IDThis field is available if the Authentication is MD5. Type the ID for MD5 authentication. The ID can be between 1 and 255.
MD5 Authentication KeyThis field is available if the Authentication is MD5. Type the password for MD5 authentication. The password can consist of alphanumeric characters and the underscore, and it can be up to 16 characters long.
LABEL DESCRIPTION
MAC Address SettingThis section appears when Interface Properties is External or General. Have the interface use either the factory assigned default MAC address, a manually specified MAC address, or clone the MAC address of another device or computer.
Use Default MAC AddressSelect this option to have the interface use the factory assigned default MAC address. By default, the Zyxel Device uses the factory assigned MAC address to identify itself.
Overwrite Default MAC AddressSelect this option to have the interface use a different MAC address. Either the MAC address in the field. Once it is successfully configured, the address will be copied to the configuration file. It will not change unless you change the setting or upload a different configuration file.
Proxy ARPProxy ARP is available for external or general interfaces on the Zyxel Device. See Section on page 244 for more information on Proxy ARP.
Enable Proxy ARPSelect this to allow the Zyxel Device to answer external interface ARP requests on behalf of a device on its internal interface. Interfaces supported are: · E t h e r n e t · V L A N · BridgeSee Section 9.4.2 on page 253 for more information.
AddClick Add to create an IPv4 Address, an IPv4 CIDR (for example, 192.168.1.1/24) or an IPv4 Range (for example, 192.168.1.2-192.168.1.100) as the target IP address. The Zyxel Device answers external ARP requests only if they match one of these inputted target IP addresses. For example, if the IPv4 Address is 192.168.1.5, then the Zyxel Device will answer ARP requests coming from the WAN only if it contains 192.168.1.5 as the target IP address.Select an existing entry and click Remove to delete that entry.
Proxy ARPEnable Proxy ARPZYXEL USGFLEX700-GB0101F - VLAN Add/Edit - 4
Related Setting
Configure WAN TRUNKClick WAN TRUNK to go to a screen where you can set this VLAN to be part of a WAN trunk for load balancing.
Configure Policy RouteClick Policy Route to go to the screen where you can manually configure a policy route to associate traffic with this VLAN.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

9.9 Bridge Interfaces

This section introduces bridges and bridge interfaces and then explains the screens for bridge interfaces.

Bridge Overview

A bridge creates a connection between two or more network segments at the layer-2 (MAC address) level. In the following example, bridge X connects four network segments.

ZYXEL USGFLEX700-GB0101F - Bridge Overview - 1

flowchart
graph TD
    subgraph A
        A1["Computer 0A:0A:0A:0A:0A"] --> X
        X -->|2| A2["Computer 0A:0A:0A:0A:0A"]
        X -->|3| A3["Computer 0A:0A:0A:0A:0A"]
        X -->|4| A4["Computer 0A:0A:0A:0A:0A"]
    end
    subgraph B
        B1["Computer 0B:0B:0B:0B:0B"] --> X
        X -->|1| B2["Computer 0B:0B:0B:0B:0B"]
        X -->|4| B3["Computer 0B:0B:0B:0B:0B"]
    end

When the bridge receives a packet, the bridge records the source MAC address and the port on which it was received in a table. It also looks up the destination MAC address in the table. If the bridge knows on which port the destination MAC address is located, it sends the packet to that port. If the destination MAC address is not in the table, the bridge broadcasts the packet on every port (except the one on which it was received).

In the example above, computer A sends a packet to computer B. Bridge X records the source address 0A:0A:0A:0A:0A and port 2 in the table. It also looks up 0B:0B:0B:0B:0B:0B in the table. There is no entry yet, so the bridge broadcasts the packet on ports 1, 3, and 4.

Table 115 Example: Bridge Table After Computer A Sends a Packet to Computer B

MAC ADDRESS PORT
0A:0A:0A:0A:0A:0A 2

If computer B responds to computer A, bridge X records the source address 0B:0B:0B:0B:0B:0B and port 4 in the table. It also looks up 0A:0A:0A:0A:0A in the table and sends the packet to port 2 accordingly.

Table 116 Example: Bridge Table After Computer B Responds to Computer A

MAC ADDRESS PORT
0A:0A:0A:0A:0A:0A 2
0B:0B:0B:0B:0B:0B 4

Bridge Interface Overview

A bridge interface creates a software bridge between the members of the bridge interface. It also becomes the Zyxel Device's interface for the resulting network.

Unlike the device-wide bridge mode in ZyNOS-based Zyxel Devices, this Zyxel Device can bridge traffic between some interfaces while it routes traffic for other interfaces. The bridge interfaces also support more functions, like interface bandwidth parameters, DHCP settings, and connectivity check. To use the whole Zyxel Device as a transparent bridge, add all of the Zyxel Device's interfaces to a bridge interface.

A bridge interface may consist of the following members:

  • Zero or one VLAN interfaces (and any associated virtual VLAN interfaces)
  • Any number of Ethernet interfaces (and any associated virtual Ethernet interfaces)

When you create a bridge interface, the Zyxel Device removes the members' entries from the routing table and adds the bridge interface's entries to the routing table. For example, this table shows the routing table before and after you create bridge interface br0 (250.250.250.0/23) between lan1 and vlan1.

Table 117 Example: Routing Table Before and After Bridge Interface br0 Is Created

IP ADDRESS(ES) DESTINATION IP ADDRESS(ES) DESTINATION
210.210.210.0/24lan1221.221.221.0/24vlan0
210.211.1.0/24lan1:1230.230.230.192/26wan2
221.221.221.0/24vlan0241.241.241.241/32dmz
222.222.222.0/24vlan1242.242.242.242/32dmz
230.230.230.192/26wan2250.250.250.0/23br0
241.241.241.241/32 dmz
242.242.242.242/32 dmz

In this example, virtual Ethernet interface lan1:1 is also removed from the routing table when lan1 is added to br0. Virtual interfaces are automatically added to or remove from a bridge interface when the underlying interface is added or removed.

9.9.1 Bridge Summary

This screen lists every bridge interface and virtual interface created on top of bridge interfaces. If you enabled IPv6 on the Configuration > System > IPv6 screen, you can also configure bridge interfaces used for your IPv6 network on this screen. To access this screen, click Configuration > Network > Interface > Bridge.

Figure 208 Configuration > Network > Interface > Bridge
Port Ethernet PPP Cellular Tunnel VLAN Bridge VTI Trunk Configuration Add Edit Remove Activate Inactivate Create Virtual Interface References # Status Name Description IP Address Member Page 0 of 0 Show 50 items No data to display IPv6 Configuration Add Edit Remove Activate Inactivate References # Status Name Description IP Address Member Page 0 of 0 Show 50 items No data to display Apply Reset

Each field is described in the following table.

Table 118 Configuration > Network > Interface > Bridge

LABEL DESCRIPTION
Configuration / IPv6 ConfigurationUse theConfigurationsection for IPv4 network settings. Use theIPv6 Configurationsection for IPv6 network settings if you connect your Zyxel Device to an IPv6 network. Both sections have similar fields as described below.
Add Click this to create a new entry.
EditDouble-click an entry or select it and clickEditto open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and clickRemove.The Zyxel Device confirms you want to remove it before doing so.
ActivateTo turn on an entry, select it and clickActivate.
InactivateTo turn off an entry, select it and clickInactivate.
Create Virtual InterfaceTo open the screen where you can create a virtual interface, select an interface and clickCreate Virtual Interface.
ReferencesSelect an entry and clickReferencesto open a screen that shows which settings use the entry. SeeSection 9.4.4 on page 255for an example.
# This field is a sequential value, and it is not associated with any interface.
Status This icon is lit when the entry is active and dimmed when the entry is inactive.
Name This field displays the name of the interface.
Description This field displays the description of the interface.
IP AddressThis field displays the current IP address of the interface. If the IP address is 0.0.0.0, the interface does not have an IP address yet.This screen also shows whether the IP address is a static IP address (STATIC) or dynamically assigned (DHCP). IP addresses are always static in virtual interfaces.
MemberThis field displays the Ethernet interfaces and VLAN interfaces in the bridge interface. It is blank for virtual interfaces.
ApplyClickApplyto save your changes back to the Zyxel Device.
ResetClickResetto return the screen to its last-saved settings.

9.9.2 Bridge Add/Edit

This screen lets you configure IP address assignment, interface bandwidth parameters, DHCP settings, and connectivity check for each bridge interface. To access this screen, click the Add or Edit icon on the Bridge Summary screen. The following screen appears.

Figure 209 Configuration > Network > Interface > Bridge > Add / Edit
Add Bridge IPv4/IPv6 View ▼ Hide Advanced Settings Create New Object General Settings Enable Interface General IPv6 Setting Enable IPv6 Interface Properties Interface Type: general Interface Name: br Zone: LAN1 Description: (Optional) Member Configuration Available sfp wan lan1 lan2 dmz opt Member IP Address Assignment Get Automatically Advance DHCP Option 60: (Optional) Use Fixed IP Address IP Address: 0.0.0.0 Subnet Mask: 0.0.0.0 Gateway: (Optional) Metric: 0 (0-15) Enable IGMP Support IGMP Upstream IGMP Downstream IPv6 Address Assignment Enable Stateless Address Auto-configuration (SLAAC) Link-Local Address: n/a IPv6 Address/Prefix Length: (Optional) Advance Gateway: (Optional) Metric: (0-15) Address from DHCPv6 Prefix Delegation Add Edit Remove References Delegated Prefix Suffix Address Addr... Page 0 of 0 Show 50 Items No data to display DHCPv6 Setting DHCPv6: N/A

DHCPv6 Setting DHCPv6: N/A IPv6 Router Advertisement Setting Enable Router Advertisement Advance Advertised Hosts Get Network Configuration From DHCPv6 Advertised Hosts Get Other Configuration From DHCPv6 Router Preference: Medium Advance MTU: 1480 (1280-1500) Hop Limit: 64 (1-255) Advertised Prefix Table Add Edit Remove IPv6 Address/Prefix Length Page 0 of 0 Show 50 Items No data to display Advance Advertised Prefix from DHCPv6 Prefix Delegation Add Edit Remove References Delegated Prefix Suffix Address Addr... Page 0 of 0 Show 50 items No data to display Advance Interface Parameters Egress Bandwidth: 1048576 Kbps Ingress Bandwidth: 1048576 Kbps MTU: 1500 Bytes DHCP Setting DHCP: None Enable IP/MAC Binding Enable Logs for IP/MAC Binding Violation Static DHCP Table Add Edit Remove IP Address MAC Description Page 0 of 0 Show 50 Items No data to display Connectivity Check Enable Connectivity Check Check Method: icmp Check Period: 30 (5-600 seconds) Check Timeout: 5 (1-10 seconds) Check Fail Tolerance: 5 (1-10) Check Default Gateway 0.0.0.0 Check These Addresses [Domain Name or IP Address] Probe Succeeds When: any one respond(s) Proxy ARP Enable Proxy ARP Add Remove Page 0 of 0 Show 50 Items No data to display

Proxy ARP Enable Proxy ARP Add Remove IP Address Page 0 of 0 Show 50 items No data to display Related Setting Configure WAN TRUNK Configure Policy Route OK Cancel

Each field is described in the table below.

Table 119 Configuration > Network > Interface > Bridge > Add / Edit

LABEL DESCRIPTION
IPv4/IPv6 View / IPv4View / IPv6 ViewUse this button to display both IPv4 and IPv6, IPv4-only, or IPv6-only configuration fields.
Show Advanced Settings / Hide Advanced SettingsClick this button to display a greater or lesser number of configuration fields.
Create New ObjectClick this button to create a DHCPv6 lease or DHCPv6 request object that you may use for the DHCPv6 settings in this screen.
General Settings
Enable InterfaceSelect this to enable this interface. Clear this to disable this interface.
General IPv6 Setting
Enable IPv6Select this to enable IPv6 on this interface. Otherwise, clear this to disable it.
Interface Properties
Interface TypeSelect one of the following option depending on the type of network to which the Zyxel Device is connected or if you want to additionally manually configure some related settings.internalis for connecting to a local network. Other corresponding configuration options: DHCP server and DHCP relay. The Zyxel Device automatically adds default SNAT settings for traffic flowing from this interface to an external interface.externalis for connecting to an external network (like the Internet). The Zyxel Device automatically adds this interface to the default WAN trunk.Forgeneral, the rest of the screen's options do not automatically adjust and you must manually configure a policy route to add routing and SNAT settings for the interface.
Interface NameThis field is read-only if you are editing the interface. Enter the name of the bridge interface. The format is brx, where x is 0 - 11. For example, br0, br3, and so on.
ZoneSelect the zone to which the interface is to belong. You use zones to apply security settings such as security policy, IDP, remote management, anti-malware, and application patrol.
DescriptionEnter a description of this interface. You can use alphanumeric and () +/ := ? ! *#@_%- characters, and it can be up to 60 characters long. Spaces are allowed, but the string can't start with a space.
Member Configuration
AvailableThis field displays Ethernet interfaces and VLAN interfaces that can become part of the bridge interface. An interface is not available in the following situations:There is a virtual interface on top of itIt is already used in a different bridge interfaceSelect one, and click the >> arrow to add it to the bridge interface. Each bridge interface can only have one VLAN interface.
MemberThis field displays the interfaces that are part of the bridge interface. Select one, and click the << arrow to remove it from the bridge interface.
IP Address Assignment
Get AutomaticallySelect this if this interface is a DHCP client. In this case, the DHCP server configures the IP address, subnet mask, and gateway automatically.
DHCP Option 60DHCP Option 60 is used by the Zyxel Device for identification to the DHCP server using the VCI (Vendor Class Identifier) on the DHCP server. The Zyxel Device adds it in the initial DHCP discovery message that a DHCP client broadcasts in search of an IP address. The DHCP server can assign different IP addresses or options to clients with the specific VCI or reject the request from clients without the specific VCI.Type a string using up to 63 of these characters [a-zA-Z0-9!\"#%&'\()*+,-./::<=>?@[\\\]\^_^{}] to identify this Zyxel Device to the DHCP server. For example, Zyxel-TW.
Use Fixed IP AddressSelect this if you want to specify the IP address, subnet mask, and gateway manually.
IP AddressThis field is enabled if you select Use Fixed IP Address.Enter the IP address for this interface.
Subnet MaskThis field is enabled if you select Use Fixed IP Address.Enter the subnet mask of this interface in dot decimal notation. The subnet mask indicates what part of the IP address is the same for all computers on the network.
GatewayThis field is enabled if you select Use Fixed IP Address.Enter the IP address of the gateway. The Zyxel Device sends packets to the gateway when it does not know how to route the packet to its destination. The gateway should be on the same network as the interface.
MetricEnter the priority of the gateway (if any) on this interface. The Zyxel Device decides which gateway to use based on this priority. The lower the number, the higher the priority. If two or more gateways have the same priority, the Zyxel Device uses the one that was configured first.
Enable IGMP SupportSelect this to allow the Zyxel Device to act as an IGMP proxy for hosts connected on the IGMP downstream interface.
IGMP UpstreamEnable IGMP Upstream on the interface which connects to a router running IGMP that is closer to the multicast server.
IGMP DownstreamEnable IGMP Downstream on the interface which connects to the multicast hosts.
IPv6 Address AssignmentThese IP address fields configure an IPv6 IP address on the interface itself.
Enable Stateless Address Auto-configuration (SLAAC)Select this to enable IPv6 stateless auto-configuration on this interface. The interface will generate an IPv6 IP address itself from a prefix obtained from an IPv6 router on the network.
Link-Local addressThis displays the IPv6 link-local address and the network prefix that the Zyxel Device generates itself for the interface.
IPv6 Address/ Prefix LengthEnter the IPv6 address and the prefix length for this interface if you want to use a static IP address. This field is optional.The prefix length indicates what the left-most part of the IP address is the same for all computers on the network, that is, the network address.
Gateway Enter theIPv6 address of the default outgoing gateway using colon (:) hexadecimal notation.
MetricEnter the priority of the gateway (if any) on this interface. The Zyxel Device decides which gateway to use based on this priority. The lower the number, the higher the priority. If two or more gateways have the same priority, the Zyxel Device uses the one that was configured first.
Address from DHCPv6 Prefix DelegationUse this table to have the Zyxel Device obtain an IPv6 prefix from the ISP or a connected uplink router for an internal network, such as the LAN or DMZ. You have to also enter a suffix address which is appended to the delegated prefix to form an address for this interface.See Prefix Delegation on page 232 for more information.To use prefix delegation, you must:Create at least one DHCPv6 request object before configuring this table.The external interface must be a DHCPv6 client. You must configure the DHCPv6 request options using a DHCPv6 request object with the type of prefix-delegation.Assign the prefix delegation to an internal interface and enable router advertisement on that interface.
Add Click this to create an entry.
EditSelect an entry and click this to change the settings.
RemoveSelect an entry and click this to delete it from this table.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry. See Section 9.4.4 on page 255 for an example.
# This field is a sequential value, and it is not associated with any entry.
Delegated PrefixSelect the DHCPv6 request object to use from the drop-down list.
Suffix AddressEnter the ending part of the IPv6 address, a slash (/), and the prefix length. The Zyxel Device will append it to the delegated prefix.For example, you got a delegated prefix of 2003:1234:5678/48. You want to configure an IP address of 2003:1234:5678:1111:1/128 for this interface, then enter ::1111:0:0:0:1/128 in this field.
Address This field displays the combined IPv6 IP address for this interface.Note: This field displays the combined address after you click OK and reopen this screen.
DHCPv6 Setting
DHCPv6Select N/A to not use DHCPv6.Select Client to set this interface to act as a DHCPv6 client.Select Server to set this interface to act as a DHCPv6 server which assigns IP addresses and provides subnet mask, gateway, and DNS server information to clients.Select Relay to set this interface to route DHCPv6 requests to the DHCPv6 relay server you specify. The DHCPv6 server(s) may be on another network.
DUIDThis field displays the DHCP Unique IDentifier (DUID) of the interface, which is unique and used for identification purposes when the interface is exchanging DHCPv6 messages with others. See DHCPv6 on page 233 for more information.
DUID as MACSelect this if you want the DUID is generated from the interface's default MAC address.
Customized DUID Ifyou want to use a customized DUID, enter it here for the interface.
Enable Rapid CommitSelect this to shorten the DHCPv6 message exchange process from four to two steps. This function helps reduce heavy network traffic load.Note: Make sure you also enable this option in the DHCPv6 clients to make rapid commit work.
Information Refresh TimeEnter the number of seconds a DHCPv6 client should wait before refreshing information retrieved from DHCPv6.
Request AddressThis field is available if you set this interface to DHCPv6 Client. Select this to get an IPv6 IP address for this interface from the DHCP server. Clear this to not get any IP address information through DHCPv6.
DHCPv6 Request Options / DHCPv6 Lease OptionsIf this interface is a DHCPv6 client, use this section to configure DHCPv6 request settings that determine what additional information to get from the DHCPv6 server.If the interface is a DHCPv6 server, use this section to configure DHCPv6 lease settings that determine what to offer to the DHCPv6 clients.
AddClick this to create an entry in this table. See Section 9.4.5 on page 256 for more information.
EditSelect an entry and click this to change the settings.
RemoveSelect an entry and click this to delete it from this table.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry. See Section 9.4.4 on page 255 for an example.
# This field is a sequential value, and it is not associated with any entry.
Name This field displays the name of the DHCPv6 request or lease object.
Type This field displays the type of the object.
ValueThis field displays the IPv6 prefix that the Zyxel Device obtained from an uplink router (Server is selected) or will advertise to its clients (Client is selected).
InterfaceWhen Relay is selected, select this check box and an interface from the drop-down list if you want to use it as the relay server.
Relay ServerWhen Relay is selected, select this check box and enter the IP address of a DHCPv6 server as the relay server.
IPv6 Router Advertisement Setting
Enable Router AdvertisementSelect this to enable this interface to send router advertisement messages periodically. See IPv6 Router Advertisement on page 232 for more information.
Advertised Hosts Get Network Configuration From DHCPv6Select this to have the Zyxel Device indicate to hosts to obtain network settings (such as prefix and DNS settings) through DHCPv6.Clear this to have the Zyxel Device indicate to hosts that DHCPv6 is not available and they should use the prefix in the router advertisement message.
Advertised Hosts Get Other Configuration From DHCPv6Select this to have the Zyxel Device indicate to hosts to obtain DNS information through DHCPv6.Clear this to have the Zyxel Device indicate to hosts that DNS information is not available in this network.
Router PreferenceSelect the router preference (Low, Medium or High) for the interface. The interface sends this preference in the router advertisements to tell hosts what preference they should use for the Zyxel Device. This helps hosts to choose their default router especially when there are multiple IPv6 router on the network.Note: Make sure the hosts also support router preference to make this function work.
MTUThe Maximum Transmission Unit. Type the maximum size of each IPv6 data packet, in bytes, that can move through this interface. If a larger packet arrives, the Zyxel Device divides it into smaller fragments.
Hop LimitEnter the maximum number of network segments that a packet can cross before reaching the destination. When forwarding an IPv6 packet, IPv6 routers are required to decrease the Hop Limit by 1 and to discard the IPv6 packet when the Hop Limit is 0.
Advertised Prefix TableConfigure this table only if you want the Zyxel Device to advertise a fixed prefix to the network.
Add Click this to create an IPv6 prefix address.
EditSelect an entry in this table and click this to modify it.
RemoveSelect an entry in this table and click this to delete it.
# This field is a sequential value, and it is not associated with any entry.
IPv6 Address/ Prefix LengthEnter the IPv6 network prefix address and the prefix length.The prefix length indicates what the left-most part of the IP address is the same for all computers on the network, that is, the network address.
Advertised Prefix from DHCPv6 Prefix DelegationUse this table to configure the network prefix if you want to use a delegated prefix as the beginning part of the network prefix.
Add Click this to create an entry in this table.
EditSelect an entry in this table and click this to modify it.
RemoveSelect an entry in this table and click this to delete it.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry. See Section 9.4.4 on page 255 for an example.
# This field is a sequential value, and it is not associated with any entry.
Delegated PrefixSelect the DHCPv6 request object to use for generating the network prefix for the network.
Suffix AddressEnter the ending part of the IPv6 network address plus a slash (/) and the prefix length. The Zyxel Device will append it to the selected delegated prefix. The combined address is the network prefix for the network.For example, you got a delegated prefix of 2003:1234:5678/48. You want to divide it into 2003:1234:5678:1111/64 for this interface and 2003:1234:5678:2222/64 for another interface. You can use ::1111/64 and ::2222/64 for the suffix address respectively. But if you do not want to divide the delegated prefix into subnetworks, enter ::0/48 here, which keeps the same prefix length (/48) as the delegated prefix.
AddressThis is the final network prefix combined by the selected delegated prefix and the suffix.Note: This field displays the combined address after you click OK and reopen this screen.
Interface Parameters
Egress BandwidthEnter the maximum amount of traffic, in kilobits per second, the Zyxel Device can send through the interface to the network. Allowed values are 0 - 1048576.
Ingress BandwidthThis is reserved for future use.Enter the maximum amount of traffic, in kilobits per second, the Zyxel Device can receive from the network through the interface. Allowed values are 0 - 1048576.
MTUMaximum Transmission Unit. Type the maximum size of each data packet, in bytes, that can move through this interface. If a larger packet arrives, the Zyxel Device divides it into smaller fragments. Allowed values are 576 - 1500. Usually, this value is 1500.
DHCP Setting
DHCPSelect what type of DHCP service the Zyxel Device provides to the network. Choices are:None- the Zyxel Device does not provide any DHCP services. There is already a DHCP server on the network.DHCP Relay- the Zyxel Device routes DHCP requests to one or more DHCP servers you specify. The DHCP server(s) may be on another network.DHCP Server- the Zyxel Device assigns IP addresses and provides subnet mask, gateway, and DNS server information to the network. The Zyxel Device is the DHCP server for the network.
These fields appear if the Zyxel Device is a DHCP Relay.
Relay Server 1 Enterthe IP address of a DHCP server for the network.
Relay Server 2This field is optional. Enter the IP address of another DHCP server for the network.
These fields appear if the Zyxel Device is a DHCP Server.
IP Pool Start AddressEnter the IP address from which the Zyxel Device begins allocating IP addresses. If you want to assign a static IP address to a specific computer, click Add Static DHCP.If this field is blank, the Pool Size must also be blank. In this case, the Zyxel Device can assign every IP address allowed by the interface's IP address and subnet mask, except for the first address (network address), last address (broadcast address) and the interface's IP address.
Pool SizeEnter the number of IP addresses to allocate. This number must be at least one and is limited by the interface's Subnet Mask. For example, if the Subnet Mask is 255.255.255.0 and IP Pool Start Address is 10.10.10.10, the Zyxel Device can allocate 10.10.10.10 to 10.10.10.254, or 245 IP addresses.If this field is blank, the IP Pool Start Address must also be blank. In this case, the Zyxel Device can assign every IP address allowed by the interface's IP address and subnet mask, except for the first address (network address), last address (broadcast address) and the interface's IP address.
First DNS Server Second DNS Server Third DNS ServerSpecify the IP addresses up to three DNS servers for the DHCP clients to use. Use one of the following ways to specify these IP addresses.Custom Defined- enter a static IP address.From ISP- select the DNS server that another interface received from its DHCP server.Zyxel Device- the DHCP clients use the IP address of this interface and the Zyxel Device works as a DNS relay.
First WINS Server, Second WINS ServerType the IP address of the WINS (Windows Internet Naming Service) server that you want to send to the DHCP clients. The WINS server keeps a mapping table of the computer names on your network and the IP addresses that they are currently using.
Default RouterIf you set this interface to DHCP Server, you can select to use either the interface's IP address or another IP address as the default router. This default router will become the DHCP clients' default gateway.To use another IP address as the default router, select Custom Defined and enter the IP address.
LABELDESCRIPTION
Lease timeSpecify how long each computer can use the information (especially the IP address) before it has to request the information again. Choices are:infinite - select this if IP addresses never expiredays, hours, and minutes - select this to enter how long IP addresses are valid.
Extended OptionsThis table is available if you selected DHCP server.Configure this table if you want to send more information to DHCP clients through DHCP packets.
AddClick this to create an entry in this table. See Section 9.4.6 on page 257.
EditSelect an entry in this table and click this to modify it.
RemoveSelect an entry in this table and click this to delete it.
# This field is a sequential value, and it is not associated with any entry.
Name This is the option's name.
Code This is the option's code number.
Type This is the option's type.
Value This is the option's value.
PXE ServerPXE (Preboot eXecution Environment) allows a client computer to use the network to boot up and install an operating system via a PXE-capable Network Interface Card (NIC).PXE is available for computers on internal interfaces to allow them to boot up using boot software on a PXE server. The Zyxel Device acts as an intermediary between the PXE server and the computers that need boot software.The PXE server must have a public IPv4 address. You must enable DHCP Server on the Zyxel Device so that it can receive information from the PXE server.
PXE Boot Loader FileA boot loader is a computer program that loads the operating system for the computer. Type the exact file name of the boot loader software file, including filename extension, that is on the PXE server. If the wrong filename is typed, then the client computers cannot boot.
Enable IP/MAC BindingSelect this option to have this interface enforce links between specific IP addresses and specific MAC addresses. This stops anyone else from manually using a bound IP address on another device connected to this interface. Use this to make use only the intended users get to use specific IP addresses.
Enable Logs for IP/MAC Binding ViolationSelect this option to have the Zyxel Device generate a log if a device connected to this interface attempts to use an IP address that is bound to another device's MAC address.
Static DHCP TableConfigure a list of static IP addresses the Zyxel Device assigns to computers connected to the interface. Otherwise, the Zyxel Device assigns an IP address dynamically using the interface's IP Pool Start Address and Pool Size.
Add Click this to create a new entry.
EditSelect an entry and click this to be able to modify it.
Remove Select an entry and click this to delete it.
# This field is a sequential value, and it is not associated with a specific entry.
IP AddressEnter the IP address to assign to a device with this entry's MAC address.
MAC Address Enter the MAC address to which to assign this entry's IP address.
DescriptionEnter a description to help identify this static DHCP entry. You can use alphanumeric and () +/ := ?! *#@$_% - characters, and it can be up to 60 characters long.
LABEL DESCRIPTION
Connectivity CheckThe interface can regularly check the connection to the gateway you specified to make sure it is still available. You specify how often the interface checks the connection, how long to wait for a response before the attempt is a failure, and how many consecutive failures are required before the Zyxel Device stops routing to the gateway. The Zyxel Device resumes routing to the gateway the first time the gateway passes the connectivity check.
Enable Connectivity CheckSelect this to turn on the connection check.
Check Method Select the method that the gateway allows.Select icmp to have the Zyxel Device regularly ping the gateway you specify to make sure it is still available.Select tcp to have the Zyxel Device regularly perform a TCP handshake with the gateway you specify to make sure it is still available.
Check Period Enter the number of seconds between connection check attempts.
Check TimeoutEnter the number of seconds to wait for a response before the attempt is a failure.
Check Fail ToleranceEnter the number of consecutive failures before the Zyxel Device stops routing through the gateway.
Check Default GatewaySelect this to use the default gateway for the connectivity check.
Check this addressSelect this to specify a domain name or IP address for the connectivity check. Enter that domain name or IP address in the field next to it.
Check PortThis field only displays when you set the Check Method to tcp. Specify the port number to use for a TCP connectivity check.
Check these addressesType one or two domain names or IP addresses for the connectivity check.
Probe Succeeds WhenThis field applies when you specify two domain names or IP addresses for the connectivity check.Select any one if you want the check to pass if at least one of the domain names or IP addresses responds.Select all if you want the check to pass only if both domain names or IP addresses respond.
Proxy ARPProxy ARP is available for external or general interfaces on the Zyxel Device. See Section on page 244 for more information on Proxy ARP.
Enable Proxy ARPSelect this to allow the Zyxel Device to answer external interface ARP requests on behalf of a device on its internal interface. Interfaces supported are: · E t h e r n e t · V L A N · BridgeSee Section 9.4.2 on page 253 for more information.
AddClick Add to create an IPv4 Address, an IPv4 CIDR (for example, 192.168.1.1/24) or an IPv4 Range (for example, 192.168.1.2-192.168.1.100) as the target IP address. The Zyxel Device answers external ARP requests only if they match one of these inputted target IP addresses. For example, if the IPv4 Address is 192.168.1.5, then the Zyxel Device will answer ARP requests coming from the WAN only if it contains 192.168.1.5 as the target IP address.Select an existing entry and click Remove to delete that entry.
Related Setting
Configure WAN TRUNKClick WAN TRUNK to go to a screen where you can configure the interface as part of a WAN trunk for load balancing.
Configure Policy RouteClick Policy Route to go to the screen where you can manually configure a policy route to associate traffic with this bridge interface.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

9.10 VTI

IPSec VPN Tunnel Interface (VTI) encrypts or decrypts IPv4 traffic from or to the interface according to the IP routing table.

VTI allows static routes to send traffic over the VPN. The IPSec tunnel endpoint is associated with an actual (virtual) interface. Therefore many interface capabilities such as Policy Route, Static Route, Trunk, and BWM can be applied to the IPSec tunnel as soon as the tunnel is active

IPSec VTI simplifies network management and load balancing. Create a trunk using VPN tunnel interfaces for load balancing. In the following example configure VPN tunnels with static IP addresses or DNS on both Zyxel Devices (or IPSec routers at the end of the tunnel). Also configure VTI and a trunk on both Zyxel Devices.

Figure 210 VTI and Trunk for VPN Load Balancing
ZYXEL USGFLEX700-GB0101F - VTI - 1

flowchart
graph LR
    A["Cloud"] --> B["Network"]
    B --> C["VSN1"]
    B --> D["VSN2"]
    C --> E["Internet"]
    D --> E
    E --> F["VTI"]
    F --> G["Z"]
    G --> H["C"]

9.10.1 Restrictions for IPSec Virtual Tunnel Interface

  • IPv4 traffic only
  • IPSec tunnel mode only. A shared keyword must not be configured when using tunnel mode.
  • With a VTI VPN you do not add local or remote LANs to your VPN configuration.
  • For a VTI VPN you should only have one local and one remote WAN.
    • A dynamic peer is not supported
  • The IPSec VTI is limited to IP unicast and multicast traffic only.

9.10.2 VTI Screen

To access this screen, click Configuration > Network > Interface > VTI.

Figure 211 Configuration > Network > Interface > VTI
Port Role Ethernet PPP Cellular Tunnel VLAN Bridge VTI Trunk Configuration Add Edit Remove Activate inactivate References Status Namen IP Address vpn-rule 1 VTII 10.1.1.1/24 Test Page 1 of 1 Show 50 items Displaying 1 - 1 of 1 Apply Reset

The following table describes the fields in this screen.

Table 120 Configuration > Network > Interface > VTI

LABEL DESCRIPTION
Configuration
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry.
# This field is a sequential value, and it is not associated with any interface.
Status This icon is lit when the entry is active and dimmed when the entry is inactive.
Name This field displays the name of the VTI interface.
IP AddressThis field displays the current IP address of the virtual interface and subnet mask in bits. If the IP address is 0.0.0.0, the interface does not have an IP address yet.
vpn-ruleThis shows the name of the associated IPSec VPN rule with VPN Tunnel Interface application scenario.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

9.10.3 VTI Add/Edit

This screen lets you configure IP address assignment and interface parameters for VTI.

Note: You should have created a VPN tunnel for a VPN Tunnel Interface scenario first.

To access this screen, click the Add or Edit icon in Network > Interface > VTI. The following screen appears.

Figure 212 Configuration > Network > Interface > VTI > Add
Add corresponding Hide Advanced Settings General Settings Enable Interface Properties Interface Name: vti Zone: IFSec_VPN vpn-rule: Please select one IP Address Assignment IP Address: 0.0.0.0 Subnet Mask: 0.0.0.0 Metric: 0 (0-15) Enable IGMP Support IGMP Upstream IGMP Downstream Interface Parameters Egress Bandwidth: 1048576 Kbps Advance Ingress Bandwidth: 1048576 Kbps Advance RIP Setting Enable RIP Direction: B/Dir Send Version: 2 Receive Version: 2 V2-Broadcast OSPF Setting Area: none Priority: 1 (0-255) Link Cost: 10 (1-65535) Passive Interface Authentication: None Related Setting Configure WAN TRUNK Configure Policy Route OK Cancel

Each field is described in the table below.

Table 121 Configuration > Network > Interface > VTI > Add

LABEL DESCRIPTION
General Settings
Enable Select this to enable VTI. Clear this to disable it.
Interface Properties
Interface NameThis field is read-only if you are editing an existing VPN tunnel interface. For a new VPN tunnel interface, enter the name of the VPN tunnel interface in vtix format, where x is a number from 0 to the maximum number of VPN connections allowed for this model. For example, enter vti10.
LABELDESCRIPTION
ZoneSelect a zone. Make sure that the zone you select does not have traffic blocked by a security feature such as a security policy.
vpn-ruleYou should have created a VPN tunnel first for aVPN Tunnel Interfacescenario. Select one of theVPN Tunnel Interfacescenario rules that you created.
IP Address Assignment
IP Address Enter the IP address for this interface.
Subnet MaskEnter the subnet mask of this interface in dot decimal notation. The subnet mask indicates what part of the IP address is the same for all computers on the network.
MetricEnter the priority of the gateway (if any) on this interface. The Zyxel Device decides which gateway to use based on this priority. The lower the number, the higher the priority. If two or more gateways have the same priority, the Zyxel Device uses the one that was configured first.
Enable IGMP SupportSelect this to allow the Zyxel Device to act as an IGMP proxy for hosts connected on the IGMP downstream interface.
IGMP UpstreamEnableIGMP Upstreamon the interface which connects to a router running IGMP that is closer to the multicast server.
IGMP DownstreamEnableIGMP Downstreamon the interface which connects to the multicast hosts.
Interface Parameters
Egress BandwidthEnter the maximum amount of traffic, in kilobits per second, the Zyxel Device can send through the interface to the network. Allowed values are 0 - 1048576.
Ingress BandwidthThis is reserved for future use.Enter the maximum amount of traffic, in kilobits per second, the Zyxel Device can receive from the network through the interface. Allowed values are 0 - 1048576.
Connectivity CheckThese fields appear when you select avpn-rule.The interface can regularly check the connection to the gateway you specified to make sure it is still available. You specify how often the interface checks the connection, how long to wait for a response before the attempt is a failure, and how many consecutive failures are required before the Zyxel Device stops routing to the gateway. The Zyxel Device resumes routing to the gateway the first time the gateway passes the connectivity check.
Enable Connectivity CheckSelect this to turn on the connection check.
Check Method Select the method that the gateway allows.Selecticmpto have the Zyxel Device regularly ping the gateway you specify to make sure it is still available.Selecttcpto have the Zyxel Device regularly perform a TCP handshake with the gateway you specify to make sure it is still available.
Check Period Enter the number of seconds between connection check attempts.
Check TimeoutEnter the number of seconds to wait for a response before the attempt is a failure.
Check Fail ToleranceEnter the number of consecutive failures before the Zyxel Device stops routing through the gateway.
Check this addressSelect this to specify a domain name or IP address for the connectivity check. Enter that domain name or IP address in the field next to it.
Check PortThis field only displays when you set theCheck Methodto tcp. Specify the port number to use for a TCP connectivity check.
RIP SettingSeeSection 10.6 on page 337for more information about RIP.
LABEL DESCRIPTION
Enable RIP Select this to enable RIP in this interface.
DirectionThis field is effective when RIP is enabled. Select the RIP direction from the drop-down list box.BiDir - This interface sends and receives routing information.In-Only - This interface receives routing information.Out-Only - This interface sends routing information.
Send VersionThis field is effective when RIP is enabled. Select the RIP version(s) used for sending RIP packets. Choices are 1, 2, and 1 and 2.
Receive VersionThis field is effective when RIP is enabled. Select the RIP version(s) used for receiving RIP packets. Choices are 1, 2, and 1 and 2.
V2-BroadcastThis field is effective when RIP is enabled. Select this to send RIP-2 packets using subnet broadcasting; otherwise, the Zyxel Device uses multicasting.
OSPF SettingSee Section 10.7 on page 339 for more information about OSPF.
AreaSelect the area in which this interface belongs. Select None to disable OSPF in this interface.
PriorityEnter the priority (between 0 and 255) of this interface when the area is looking for a Designated Router (DR) or Backup Designated Router (BDR). The highest-priority interface identifies the DR, and the second-highest-priority interface identifies the BDR. Set the priority to zero if the interface can not be the DR or BDR.
Link CostEnter the cost (between 1 and 65,535) to route packets through this interface.
Passive InterfaceSelect this to stop forwarding OSPF routing information from the selected interface. As a result, this interface only receives routing information.
AuthenticationSelect an authentication method, or disable authentication. To exchange OSPF routing information with peer border routers, you must use the same authentication method that they use. Choices are:Same-as-Area - use the default authentication method in the areaNone - disable authenticationText - authenticate OSPF routing information using a plain-text passwordMD5 - authenticate OSPF routing information using MD5 encryption
Text Authentication KeyThis field is available if the Authentication is Text. Type the password for text authentication. The key can consist of alphanumeric characters and the underscore, and it can be up to 16 characters long.
MD5 Authentication IDThis field is available if the Authentication is MD5. Type the ID for MD5 authentication. The ID can be between 1 and 255.
MD5 Authentication KeyThis field is available if the Authentication is MD5. Type the password for MD5 authentication. The password can consist of alphanumeric characters and the underscore, and it can be up to 16 characters long.
Related Setting
Configure WAN TRUNKClick WAN TRUNK to go to a screen where you can configure the interface as part of a WAN trunk for load balancing.
Configure Policy RouteClick Policy Route to go to the screen where you can manually configure a policy route to associate traffic with this bridge interface.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

9.11 Trunk Overview

Use trunks for WAN traffic load balancing to increase overall network throughput and reliability. Load balancing divides traffic loads between multiple interfaces. This allows you to improve quality of service and maximize bandwidth utilization for multiple ISP links.

Maybe you have two Internet connections with different bandwidths. You could set up a trunk that uses spillover or weighted round robin load balancing so time-sensitive traffic (like video) usually goes through the higher-bandwidth interface. For other traffic, you might want to use least load first load balancing to even out the distribution of the traffic load.

Suppose ISP A has better connections to Europe while ISP B has better connections to Australia. You could use policy routes and trunks to have traffic for your European branch office primarily use ISP A and traffic for your Australian branch office primarily use ISP B.

Or maybe one of the Zyxel Device's interfaces is connected to an ISP that is also your Voice over IP (VoIP) service provider. You can use policy routing to send the VoIP traffic through a trunk with the interface connected to the VoIP service provider set to active and another interface (connected to another ISP) set to passive. This way VoIP traffic goes through the interface connected to the VoIP service provider whenever the interface's connection is up.

  • Use the Trunk summary screen (Section 9.12 on page 316) to view the list of configured trunks and which load balancing algorithm each trunk uses.
  • Use the Add Trunk screen (Section 9.12.1 on page 317) to configure the member interfaces for a trunk and the load balancing algorithm the trunk uses.
  • Use the Add System Default screen (Section 9.12.2 on page 319) to configure the load balancing algorithm for the system default trunk.

9.11.1 What You Need to Know

  • Add WAN interfaces to trunks to have multiple connections share the traffic load.
  • If one WAN interface's connection goes down, the Zyxel Device sends traffic through another member of the trunk.
  • For example, you connect one WAN interface to one ISP and connect a second WAN interface to a second ISP. The Zyxel Device balances the WAN traffic load between the connections. If one interface's connection goes down, the Zyxel Device can automatically send its traffic through another interface.

You can also use trunks with policy routing to send specific traffic types through the best WAN interface for that type of traffic.

  • If that interface's connection goes down, the Zyxel Device can still send its traffic through another interface.
  • You can define multiple trunks for the same physical interfaces.

1 LAN user A logs into server B on the Internet. The Zyxel Device uses wan1 to send the request to server B.

2 The Zyxel Device is using active/active load balancing. So when LAN user A tries to access something on the server, the request goes out through wan2.

3 The server finds that the request comes from wan2's IP address instead of wan1's IP address and rejects the request.

If link sticking had been configured, the Zyxel Device would have still used wan1 to send LAN user A's request to the server and server would have given the user A access.

Load Balancing Algorithms

The following sections describe the load balancing algorithms the Zyxel Device can use to decide which interface the traffic (from the LAN) should use for a session. In the load balancing section, a session may refer to normal connection-oriented, UDP or SNMP2 traffic. The available bandwidth you configure on the Zyxel Device refers to the actual bandwidth provided by the ISP and the measured bandwidth refers to the bandwidth an interface is currently using.

Least Load First

The least load first algorithm uses the current (or recent) outbound bandwidth utilization of each trunk member interface as the load balancing index(es) when making decisions about to which interface a new session is to be distributed. The outbound bandwidth utilization is defined as the measured outbound throughput over the available outbound bandwidth.

Here the Zyxel Device has two WAN interfaces connected to the Internet. The configured available outbound bandwidths for WAN 1 and WAN 2 are 512K and 256K respectively.

Figure 213 Load Balancing Least Load First Example
ZYXEL USGFLEX700-GB0101F - Least Load First - 1

flowchart
graph LR
    A["..."] --> B["WAN 1\n512k"]
    C["ppp0\n256k"] --> D["Internet"]

The outbound bandwidth utilization is used as the load balancing index. In this example, the measured (current) outbound throughput of WAN 1 is 412K and WAN 2 is 198K. The Zyxel Device calculates the load balancing index as shown in the table below.

Since WAN 2 has a smaller load balancing index (meaning that it is less utilized than WAN 1), the Zyxel Device will send the subsequent new session traffic through WAN 2.

Table 122 Least Load First Example

INTERFACEOUTBOUNDLOAD BALANCING INDEX (M/A)
AVAILABLE (A) MEASURED (M)
WAN 1 512 K 412 K 0.8
WAN 2 256 K 198 K 0.77

Weighted Round Robin

Round Robin scheduling services queues on a rotating basis and is activated only when an interface has more traffic than it can handle. A queue is given an amount of bandwidth irrespective of the incoming

traffic on that interface. This queue then moves to the back of the list. The next queue is given an equal amount of bandwidth, and then moves to the end of the list; and so on, depending on the number of queues being used. This works in a looping fashion until a queue is empty.

The Weighted Round Robin (WRR) algorithm is best suited for situations when the bandwidths set for the two WAN interfaces are different. Similar to the Round Robin (RR) algorithm, the Weighted Round Robin (WRR) algorithm sets the Zyxel Device to send traffic through each WAN interface in turn. In addition, the WAN interfaces are assigned weights. An interface with a larger weight gets more chances to transmit traffic than an interface with a smaller weight.

For example, in the figure below, the configured available bandwidth of WAN1 is 1M and WAN2 is 512K. You can set the Zyxel Device to distribute the network traffic between the two interfaces by setting the weight of wan1 and wan2 to 2 and 1 respectively. The Zyxel Device assigns the traffic of two sessions to wan1 and one session's traffic to wan2 in each round of 3 new sessions.

Figure 214 Weighted Round Robin Algorithm Example
ZYXEL USGFLEX700-GB0101F - Weighted Round Robin - 1

flowchart
graph LR
    S6 --> S4
    S5 --> S4
    S4 --> S2
    S2 --> S1
    S1 --> WAN1["1M"]
    WAN1 --> S3
    S3 --> PPP0["512k"]
    PPP0 --> Internet

Spillover

The spillover load balancing algorithm sends network traffic to the first interface in the trunk member list until the interface's maximum allowable load is reached, then sends the excess network traffic of new sessions to the next interface in the trunk member list. This continues as long as there are more member interfaces and traffic to be sent through them.

Suppose the first trunk member interface uses an unlimited access Internet connection and the second is billed by usage. Spillover load balancing only uses the second interface when the traffic load exceeds the threshold on the first interface. This fully utilizes the bandwidth of the first interface to reduce Internet usage fees and avoid overloading the interface.

In this example figure, the upper threshold of the first interface is set to 800K. The Zyxel Device sends network traffic of new sessions that exceed this limit to the secondary WAN interface.

Figure 215 Spillover Algorithm Example
ZYXEL USGFLEX700-GB0101F - Spillover - 1

flowchart
graph LR
    A["1M"] --> B["800k"]
    A --> C["200k"]
    B --> D["WAN 1 800K"]
    C --> D
    D --> E["ppp0"]
    E --> F["Internet"]

9.12 The Trunk Summary Screen

Click Configuration > Network > Interface > Trunk to open the Trunk screen. The Trunk Summary screen lists the configured trunks and the load balancing algorithm that each is configured to use.

Figure 216 Configuration > Network > Interface > Trunk
Port Role Ethernet PPP Cellular Tunnel VLAN Bridge VTI Trunk Hide Advanced Settings Configuration Disconnect Connections Before Falling Back Default WAN Trunk Advance Enable Default SNAT Default Trunk Selection SYSTEM_DEFAULT_WAN_TRUNK User Configured Trunk Please select one User Configuration Add Edit Remove References Name Algorithm Page 0 of 0 Show 50 items No data to display System Default Edit References Name Algorithm 1 SYSTEM_DEFAULT_WAN_TRUNK If! Page 1 of 1 Show 50 items Displaying 1 - 1 of 1 Apply Reset

The following table describes the items in this screen.

Table 123 Configuration > Network > Interface > Trunk

LABEL DESCRIPTION
Show Advanced Settings / Hide Advanced SettingsClick this button to display a greater or lesser number of configuration fields.
ConfigurationConfigure what to do with existing passive mode interface connections when an interface set to active mode in the same trunk comes back up.
Disconnect Connections Before Falling BackSelect this to terminate existing connections on an interface which is set to passive mode when any interface set to active mode in the same trunk comes back up.
Enable Default SNATSelect this to have the Zyxel Device use the IP address of the outgoing interface as the source IP address of the packets it sends out through its WAN trunks. The Zyxel Device automatically adds SNAT settings for traffic it routes from internal interfaces to external interfaces.
Default Trunk SelectionSelect whether the Zyxel Device is to use the default system WAN trunk or one of the user configured WAN trunks as the default trunk for routing traffic from internal interfaces to external interfaces.
User Configuration / System DefaultThe Zyxel Device automatically adds all external interfaces into the pre-configured system default SYSTEM_DEFAULT_WAN_TRUNK. You cannot delete it. You can create your own User Configuration trunks and customize the algorithm, member interfaces and the active/passive mode.
Add Click this to create a new user-configured trunk.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove a user-configured trunk, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry. See Section 9.4.4 on page 255 for an example.
# This field is a sequential value, and it is not associated with any interface.
Name This field displays the label that you specified to identify the trunk.
AlgorithmThis field displays the load balancing method the trunk is set to use.
Apply Click this button to save your changes to the Zyxel Device.
Reset Click this button to return the screen to its last-saved settings.

9.12.1 Configuring a User-Defined Trunk

Click Configuration > Network > Interface > Trunk, in the User Configuration table click the Add (or Edit) icon to open the following screen. Use this screen to create or edit a WAN trunk entry.

Figure 217 Configuration > Network > Interface > Trunk > Add (or Edit)
Add Trunk Name: Load Balancing Algorithm: Least Load First Load Balancing indexes: Outbound Add Edit Remove Move Member Mode Egress Bandwidth Page at 0 Show 50 Items No data to display OK Cancel

Each field is described in the table below.

Table 124 Configuration > Network > Interface > Trunk > Add (or Edit)

LABEL DESCRIPTION
NameThis is read-only if you are editing an existing trunk. When adding a new trunk, enter a descriptive name for this trunk. You may use 1-31 alphanumeric characters, underscores (_), or dashes (-), but the first character cannot be a number. This value is case-sensitive.
Load Balancing AlgorithmSelect a load balancing method to use from the drop-down list box.SelectWeighted Round Robinto balance the traffic load between interfaces based on their respective weights. An interface with a larger weight gets more chances to transmit traffic than an interface with a smaller weight. For example, if the weight ratio of wan1 and wan2 interfaces is 2:1, the Zyxel Device chooses wan1 for 2 sessions' traffic and wan2 for 1 session's traffic in each round of 3 new sessions.SelectLeast Load Firstto send new session traffic through the least utilized trunk member.SelectSpilloverto send network traffic through the first interface in the group member list until there is enough traffic that the second interface needs to be used (and so on).
Load Balancing Index(es)This field is available if you selected to use theLeast Load FirstorSpillovermethod.SelectOutbound, Inbound, orOutbound + Inboundto set the traffic to which the Zyxel Device applies the load balancing method. Outbound means the traffic traveling from an internal interface (ex. LAN) to an external interface (ex. WAN). Inbound means the opposite.
The table lists the trunk's member interfaces. You can add, edit, remove, or move entries for user configured trunks.
AddClick this to add a member interface to the trunk. Select an interface and clickAddto add a new member interface after the selected member interface.
EditSelect an entry and clickEditto modify the entry's settings.
RemoveTo remove a member interface, select it and clickRemove.The Zyxel Device confirms you want to remove it before doing so.
MoveTo move an interface to a different number in the list, click theMoveicon. In the field that appears, specify the number to which you want to move the interface.
#This column displays the priorities of the group's interfaces. The order of the interfaces in the list is important since they are used in the order they are listed.
MemberClick this table cell and select an interface to be a group member.If you select an interface that is part of another Ethernet interface, the Zyxel Device does not send traffic through the interface as part of the trunk. For example, if you have physical port 5 in the ge2 representative interface, you must select interface ge2 in order to send traffic through port 5 as part of the trunk. If you select interface ge5 as a member here, the Zyxel Device will not send traffic through port 5 as part of the trunk.
ModeClick this table cell and selectActiveto have the Zyxel Device always attempt to use this connection.SelectPassiveto have the Zyxel Device only use this connection when all of the connections set to active are down. You can only set one of a group's interfaces to passive mode.
WeightThis field displays with the weighted round robin load balancing algorithm. Specify the weight (1~10) for the interface. The weights of the different member interfaces form a ratio. This ratio determines how much traffic the Zyxel Device assigns to each member interface. The higher an interface's weight is (relative to the weights of the interfaces), the more sessions that interface should handle.
Ingress Bandwidth This is reserved for future use.This field displays with the least load first load balancing algorithm. It displays the maximum number of kilobits of data the Zyxel Device is to allow to come in through the interface per second.Note: You can configure the bandwidth of an interface on the corresponding interface edit screen.
Egress BandwidthThis field displays with the least load first or spillover load balancing algorithm. It displays the maximum number of kilobits of data the Zyxel Device is to send out through the interface per second.Note: You can configure the bandwidth of an interface on the corresponding interface edit screen.
SpilloverThis field displays with the spillover load balancing algorithm. Specify the maximum bandwidth of traffic in kilobits per second (1~1048576) to send out through the interface before using another interface. When this spillover bandwidth limit is exceeded, the Zyxel Device sends new session traffic through the next interface. The traffic of existing sessions still goes through the interface on which they started.The Zyxel Device uses the group member interfaces in the order that they are listed.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

9.12.2 Configuring the System Default Trunk

on the Configuration > Network > Interface > Trunk screen and the System Default section, select the default trunk entry and click Edit to open the following screen. Use this screen to change the load balancing algorithm and view the bandwidth allocations for each member interface.

Note: The available bandwidth is allocated to each member interface equally and is not allowed to be changed for the default trunk.

Figure 218 Configuration > Network > Interface > Trunk > Edit (System Default)
Edit System Default Name: SYSTEM_DEFAULT_WAN_TRUNK Load Balancing Algorithm: Least Load First Member Mode Ingress Bandwidth Express Ban... 1 wan1 Active 1048576 kbps 1048576 k... 2 wan2 Active 1048576 kbps 1048576 k... 3 wan1_ppp Active 1048576 kbps 1048576 k... 4 wan2_ppp Active 1048576 kbps 1048576 k... 5 sfp_ppp Active 1048576 kbps 1048576 k... 6 cellular2 Active 1048576 kbps 1048576 k... Page 1 of 1 Show 50 items Displaying 1 - 6 of 6 OK Cancel

Each field is described in the table below.

Table 125 Configuration > Network > Interface > Trunk > Edit (System Default)

LABEL DESCRIPTION
Name This field displaysthe name of the selected system default trunk.
Load Balancing AlgorithmSelect the load balancing method to use for the trunk.SelectWeighted Round Robinto balance the traffic load between interfaces based on their respective weights. An interface with a larger weight gets more chances to transmit traffic than an interface with a smaller weight. For example, if the weight ratio of wan1 and wan2 interfaces is 2:1, the Zyxel Device chooses wan1 for 2 sessions' traffic and wan2 for 1 session's traffic in each round of 3 new sessions.SelectLeast Load Firstto send new session traffic through the least utilized trunk member.SelectSpilloverto send network traffic through the first interface in the group member list until there is enough traffic that the second interface needs to be used (and so on).
The table lists the trunk's member interfaces. This table is read-only.
#This column displays the priorities of the group's interfaces. The order of the interfaces in the list is important since they are used in the order they are listed.
Member This column displays the name of the member interfaces.
ModeThis field displaysActiveif the Zyxel Device always attempt to use this connection.This field displaysPassiveif the Zyxel Device only use this connection when all of the connections set to active are down. Only one of a group's interfaces can be set to passive mode.
WeightThis field displays with the weighted round robin load balancing algorithm. Specify the weight (1~10) for the interface. The weights of the different member interfaces form a ratio.s
Ingress Bandwidth This is reserved for future use.This field displays with the least load first load balancing algorithm. It displays the maximum number of kilobits of data the Zyxel Device is to allow to come in through the interface per second.
Egress BandwidthThis field displays with the least load first or spillover load balancing algorithm. It displays the maximum number of kilobits of data the Zyxel Device is to send out through the interface per second.
SpilloverThis field displays with the spillover load balancing algorithm. Specify the maximum bandwidth of traffic in kilobits per second (1~1048576) to send out through the interface before using another interface. When this spillover bandwidth limit is exceeded, the Zyxel Device sends new session traffic through the next interface. The traffic of existing sessions still goes through the interface on which they started.The Zyxel Device uses the group member interfaces in the order that they are listed.
OKClickOKto save your changes back to the Zyxel Device.
CancelClickCancelto exit this screen without saving.

9.13 Interface Technical Reference

Here is more detailed information about interfaces on the Zyxel Device.

IP Address Assignment

Most interfaces have an IP address and a subnet mask. This information is used to create an entry in the routing table.

Figure 219 Example: Entry in the Routing Table Derived from Interfaces
ZYXEL USGFLEX700-GB0101F - IP Address Assignment - 1

flowchart
graph LR
    subgraph Network1
        A["Computer"] --> B["Switch"]
        C["Computer"] --> B
        B -->|LAN 100.100| D["lan1"]
    end
    subgraph Network2
        E["Computer"] --> F["Switch"]
        G["Computer"] --> F
        F -->|0.1/24| D
    end

Table 126 Example: Routing Table Entries for Interfaces

IP ADDRESS(ES) DESTINATION
100.100.1.1/16 lan1
200.200.200.1/24 wan1

For example, if the Zyxel Device gets a packet with a destination address of 100.100.25.25, it routes the packet to interface lan1. If the Zyxel Device gets a packet with a destination address of 200.200.200.200, it routes the packet to interface wan1.

In most interfaces, you can enter the IP address and subnet mask manually. In PPPoE/PPTP/L2TP interfaces, however, the subnet mask is always 255.255.255.255 because it is a point-to-point interface. For these interfaces, you can only enter the IP address.

In many interfaces, you can also let the IP address and subnet mask be assigned by an external DHCP server on the network. In this case, the interface is a DHCP client. Virtual interfaces, however, cannot be DHCP clients. You have to assign the IP address and subnet mask manually.

In general, the IP address and subnet mask of each interface should not overlap, though it is possible for this to happen with DHCP clients.

In the example above, if the Zyxel Device gets a packet with a destination address of 5.5.5.5, it might not find any entries in the routing table. In this case, the packet is dropped. However, if there is a default router to which the Zyxel Device should send this packet, you can specify it as a gateway in one of the interfaces. For example, if there is a default router at 200.200.200.100, you can create a gateway at 200.200.200.100 on ge2. In this case, the Zyxel Device creates the following entry in the routing table.

Table 127 Example: Routing Table Entry for a Gateway

IP ADDRESS(ES) DESTINATION
0.0.0.0/0 200.200.200.100

The gateway is an optional setting for each interface. If there is more than one gateway, the Zyxel Device uses the gateway with the lowest metric, or cost. If two or more gateways have the same metric, the Zyxel Device uses the one that was set up first (the first entry in the routing table). In PPPoE/PPTP/L2TP interfaces, the other computer is the gateway for the interface by default. In this case, you should specify the metric.

If the interface gets its IP address and subnet mask from a DHCP server, the DHCP server also specifies the gateway, if any.

Interface Parameters

The Zyxel Device restricts the amount of traffic into and out of the Zyxel Device through each interface.

  • Egress bandwidth sets the amount of traffic the Zyxel Device sends out through the interface to the network.
  • Ingress bandwidth sets the amount of traffic the Zyxel Device allows in through the interface from the network. At the time of writing, the Zyxel Device does not support ingress bandwidth management.

If you set the bandwidth restrictions very high, you effectively remove the restrictions.

The Zyxel Device also restricts the size of each data packet. The maximum number of bytes in each packet is called the maximum transmission unit (MTU). If a packet is larger than the MTU, the Zyxel Device divides it into smaller fragments. Each fragment is sent separately, and the original packet is re-assembled later. The smaller the MTU, the more fragments sent, and the more work required to re-assemble packets correctly. On the other hand, some communication channels, such as Ethernet over ATM, might not be able to handle large data packets.

DHCP Settings

Dynamic Host Configuration Protocol (DHCP, RFC 2131, RFC 2132) provides a way to automatically set up and maintain IP addresses, subnet masks, gateways, and some network information (such as the IP addresses of DNS servers) on computers on the network. This reduces the amount of manual configuration you have to do and usually uses available IP addresses more efficiently.

In DHCP, every network has at least one DHCP server. When a computer (a DHCP client) joins the network, it submits a DHCP request. The DHCP servers get the request; assign an IP address; and provide the IP address, subnet mask, gateway, and available network information to the DHCP client. When the DHCP client leaves the network, the DHCP servers can assign its IP address to another DHCP client.

In the Zyxel Device, some interfaces can provide DHCP services to the network. In this case, the interface can be a DHCP relay or a DHCP server.

As a DHCP relay, the interface routes DHCP requests to DHCP servers on different networks. You can specify more than one DHCP server. If you do, the interface routes DHCP requests to all of them. It is possible for an interface to be a DHCP relay and a DHCP client simultaneously.

As a DHCP server, the interface provides the following information to DHCP clients.

- IP address - If the DHCP client's MAC address is in the Zyxel Device's static DHCP table, the interface assigns the corresponding IP address. If not, the interface assigns IP addresses from a pool, defined by the starting address of the pool and the pool size.

Table 128 Example: Assigning IP Addresses from a Pool

START IP ADDRESS POOL SIZE RANGE OF ASSIGNED IP ADDRESS
50.50.50.33 5 50.50.50.33 - 50.50.50.37
75.75.75.1 200 75.75.75.1 - 75.75.75.200
99.99.1.1 1023 99.99.1.1 - 99.99.4.255
120.120.120.100 100 120.120.120.100 - 120.120.120.199

The Zyxel Device cannot assign the first address (network address) or the last address (broadcast address) on the subnet defined by the interface's IP address and subnet mask. For example, in the first entry, if the subnet mask is 255.255.255.0, the Zyxel Device cannot assign 50.50.50.0 or 50.50.50.255. If the subnet mask is 255.255.0.0, the Zyxel Device cannot assign 50.50.0.0 or 50.50.255.255. Otherwise, it can assign every IP address in the range, except the interface's IP address.

If you do not specify the starting address or the pool size, the interface the maximum range of IP addresses allowed by the interface's IP address and subnet mask. For example, if the interface's IP address is 9.9.9.1 and subnet mask is 255.255.255.0, the starting IP address in the pool is 9.9.9.2, and the pool size is 253.

  • Subnet mask - The interface provides the same subnet mask you specify for the interface. See IP Address Assignment on page 321.
  • Gateway - The interface provides the same gateway you specify for the interface. See IP Address Assignment on page 321.
  • DNS servers - The interface provides IP addresses for up to three DNS servers that provide DNS services for DHCP clients. You can specify each IP address manually (for example, a company's own DNS server), or you can refer to DNS servers that other interfaces received from DHCP servers (for example, a DNS server at an ISP). These other interfaces have to be DHCP clients.

It is not possible for an interface to be the DHCP server and a DHCP client simultaneously.

WINS

WINS (Windows Internet Naming Service) is a Windows implementation of NetBIOS Name Server (NBNS) on Windows. It keeps track of NetBIOS computer names. It stores a mapping table of your network's computer names and IP addresses. The table is dynamically updated for IP addresses assigned by DHCP. This helps reduce broadcast traffic since computers can query the server instead of broadcasting a request for a computer name's IP address. In this way WINS is similar to DNS, although WINS does not use a hierarchy (unlike DNS). A network can have more than one WINS server. Samba can also serve as a WINS server.

PPPoE/ PPTP/ L2TP Overview

Point-to-Point Protocol over Ethernet (PPPoE, RFC 2516) and Point-to-Point Tunneling Protocol (PPTP, RFC 2637) are usually used to connect two computers over phone lines or broadband connections. PPPoE is often used with cable modems and DSL connections. It provides the following advantages:

  • The access and authentication method works with existing systems, including RADIUS.
  • You can access one of several network services. This makes it easier for the service provider to offer the service
  • PPPoE does not usually require any special configuration of the modem.

PPTP is used to set up virtual private networks (VPN) in unsecured TCP/IP environments. It sets up two sessions.

1 The first one runs on TCP port 1723. It is used to start and manage the second one.
2 The second one uses Generic Routing Encapsulation (GRE, RFC 2890) to transfer information between the computers.
PPTP is convenient and easy-to-use, but you have to make sure that firewalls support both PPTP sessions.
Layer 2 Tunneling Protocol (L2TP) was taken from PPTP of Microsoft and Cisco's L2F (Layer 2 Forwarding technology), so LT2P combines PPTP's control and runs over a faster transport protocol, UDP, although it may be a bit more complicated to set up.
It supports up to 256 bit session keys using the IPSec protocol. When security is a priority, L2TP is a good option as it requires certificates unlike PPTP.
It uses the following ports: UDP 500, Protocol 50, UDP 1701 and UDP 4500.

CHAPTER 10 Routing

10.1 Policy and Static Routes Overview

Use policy routes and static routes to override the Zyxel Device's default routing behavior in order to send packets through the appropriate interface or VPN tunnel.

For example, the next figure shows a computer (A) connected to the Zyxel Device's LAN interface. The Zyxel Device routes most traffic from A to the Internet through the Zyxel Device's default gateway (R1). You create one policy route to connect to services offered by your ISP behind router R2. You create another policy route to communicate with a separate network behind another router (R3) connected to the LAN.

Figure 220 Example of Policy Routing Topology
ZYXEL USGFLEX700-GB0101F - Policy and Static Routes Overview - 1

flowchart
graph TD
    A["A"] -->|LAN| LAN
    LAN -->|WAN| R1["R1"]
    LAN -->|WAN| R2["R2"]
    LAN -->|WAN| R3["R3"]
    R1 --> Internet["Internet"]
    R2 --> Internet
    R3 --> Internet

Note: You can generally just use policy routes. You only need to use static routes if you have a large network with multiple routers where you use RIP or OSPF to propagate routing information to other routers.

10.1.1 What You Can Do in this Chapter

  • Use the Policy Route screens (see Section 10.2 on page 327) to list and configure policy routes.
  • Use the Static Route screens (see Section 10.3 on page 334) to list and configure static routes.

10.1.2 What You Need to Know

Policy Routing

Traditionally, routing is based on the destination address only and the Zyxel Device takes the shortest path to forward a packet. IP Policy Routing (IPPR) provides a mechanism to override the default routing behavior and alter the packet forwarding based on the policy defined by the network administrator. Policy-based routing is applied to incoming packets on a per interface basis, prior to the normal routing.

How You Can Use Policy Routing

  • Source-Based Routing – Network administrators can use policy-based routing to direct traffic from different users through different connections.
  • Bandwidth Shaping – You can allocate bandwidth to traffic that matches routing policies and prioritize traffic (however the application patrol's bandwidth management is more flexible and recommended for TCP and UDP traffic). You can also use policy routes to manage other types of traffic (like ICMP traffic) and send traffic through VPN tunnels.

Note: Bandwidth management in policy routes has priority over application patrol bandwidth management.

  • Cost Savings – IPPR allows organizations to distribute interactive traffic on high-bandwidth, high-cost paths while using low-cost paths for batch traffic.
  • Load Sharing – Network administrators can use IPPR to distribute traffic among multiple paths.
  • NAT - The Zyxel Device performs NAT by default for traffic going to or from the WAN interfaces. A routing policy's SNAT allows network administrators to have traffic received on a specified interface use a specified IP address as the source IP address.

Note: The Zyxel Device automatically uses SNAT for traffic it routes from internal interfaces to external interfaces. For example LAN to WAN traffic.

Static Routes

The Zyxel Device usually uses the default gateway to route outbound traffic from computers on the LAN to the Internet. To have the Zyxel Device send data to devices not reachable through the default gateway, use static routes. Configure static routes if you need to use RIP or OSPF to propagate the routing information to other routers. See Chapter 10 on page 336 for more on RIP and OSPF.

Policy Routes Versus Static Routes

  • Policy routes are more flexible than static routes. You can select more criteria for the traffic to match and can also use schedules, NAT, and bandwidth management.
  • Policy routes are only used within the Zyxel Device itself. Static routes can be propagated to other routers using RIP or OSPF.
  • Policy routes take priority over static routes. If you need to use a routing policy on the Zyxel Device and propagate it to other routers, you could configure a policy route and an equivalent static route.

DiffServ

QoS is used to prioritize source-to-destination traffic flows. All packets in the same flow are given the same priority. CoS (class of service) is a way of managing traffic in a network by grouping similar types of

traffic together and treating each type as a class. You can use CoS to give different priorities to different packet types.

DiffServ (Differentiated Services) is a class of service (CoS) model that marks packets so that they receive specific per-hop treatment at DiffServ-compliant network devices along the route based on the application types and traffic flow. Packets are marked with DiffServ Code Points (DSCPs) indicating the level of service desired. This allows the intermediary DiffServ-compliant network devices to handle the packets differently depending on the code points without the need to negotiate paths or remember state information for every flow. In addition, applications do not have to request a particular service or give advanced notice of where the traffic is going.

DSCP Marking and Per-Hop Behavior

DiffServ defines a new DS (Differentiated Services) field to replace the Type of Service (TOS) field in the IP header. The DS field contains a 2-bit unused field and a 6-bit DSCP field which can define up to 64 service levels. The following figure illustrates the DS field.

DSCP (6 bits) Unused (2 bits)

DSCP is backward compatible with the three precedence bits in the ToS octet so that non-DiffServ compliant, ToS-enabled network device will not conflict with the DSCP mapping.

The DSCP value determines the forwarding behavior, the PHB (Per-Hop Behavior), that each packet gets across the DiffServ network. Based on the marking rule, different kinds of traffic can be marked for different kinds of forwarding. Resources can then be allocated according to the DSCP values and the configured policies.

10.2 Policy Route Screen

Click Configuration > Network > Routing to open the Policy Route screen. Use this screen to see the configured policy routes and turn policy routing based bandwidth management on or off.

A policy route defines the matching criteria and the action to take when a packet meets the criteria. The action is taken only when all the criteria are met. The criteria can include the user name, source address and incoming interface, destination address, schedule, IP protocol (ICMP, UDP, TCP, etc.) and port.

The actions that can be taken include:

  • Routing the packet to a different gateway, outgoing interface, VPN tunnel, or trunk.
  • Limiting the amount of bandwidth available and setting a priority for traffic.

IPPR follows the existing packet filtering facility of RAS in style and in implementation.

If you enabled IPv6 in the Configuration > System > IPv6 screen, you can also configure policy routes used for your IPv6 networks on this screen.

Click on the icons to go to the OneSecurity website where there is guidance on configuration walkthroughs, troubleshooting, and other information.

Figure 221 Configuration > Network > Routing > Policy Route
Policy Route Static Route RIP OSPF BGP Hide Filter Configuration Walkthrough Troubleshooting IPv4 Configuration User: any Destination: Schedle: Income: any DSCP Code: Service: Source: (1..65535) Incoming: any Source Port: Search Reset Use IPv4 Policy Route to Override Direct Route Add Edit Remove Activate Inactivate Move St... User Schedle... Income... Source Destin... DSCP ... Service Source ... Next-HP... DSCP ... SNAT 1 any none WIZ_L2... any any any any any any auto preserve outgoing... Page 1 of 1 Show 50 Items Displaying 1 - 1 of 1 IPv6 Configuration User: any Destination: Schedle: Income: any DSCP Code: Service: Source: (1..65535) Search Reset Use IPv6 Policy Route to Override Direct Route Add Edit Remove Activate Inactivate Move Sta... User Schedule Incoming Source Destina... DSCP C... Service Source ... Next-Stop DSCP ... Page 0 of 0 Show 50 Items No data to display Apply Reset

The following table describes the labels in this screen.

Table 129 Configuration > Network > Routing > Policy Route

LABEL DESCRIPTION
Show Filter / Hide FilterClick this button to display a greater or lesser number of configuration fields.
IPv4 Configuration / IPv6 ConfigurationUse theIPv4 Configurationsection for IPv4 network settings. Use theIPv6 Configurationsection for IPv6 network settings if you connect your Zyxel Device to an IPv6 network. Both sections have similar fields as described below.
Use IPv4/IPv6 Policy Route to Override Direct RouteSelect this to have the Zyxel Device forward packets that match a policy route according to the policy route instead of sending the packets directly to a connected network.
AddClick this to create a new entry. Select an entry and clickAddto create a new entry after the selected entry.
EditDouble-click an entry or select it and clickEditto open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and clickRemove. The Zyxel Device confirms you want to remove it before doing so.
ActivateTo turn on an entry, select it and clickActivate.
InactivateTo turn off an entry, select it and clickInactivate.
MoveTo change a rule's position in the numbered list, select the rule and clickMoveto display a field to type a number for where you want to put that rule and press [ENTER] to move the rule to the number that you typed.The ordering of your rules is important as they are applied in order of their numbering.
# This is the number of an individual policy route.
StatusThis icon is lit when the entry is active, red when the next hop's connection is down, and dimmed when the entry is inactive.
UserThis is the name of the user (group) object from which the packets are sent.anymeans all users.
ScheduleThis is the name of the schedule object. none means the route is active at all times if enabled.
Incoming This is the interface on which the packets are received.
SourceThis is the name of the source IP address (group) object, including geographic address and FQDN (group) objects. any means all IP addresses.
DestinationThis is the name of the destination IP address (group) object, including geographic and FQDN (group) address objects. any means all IP addresses.
DSCP CodeThis is the DSCP value of incoming packets to which this policy route applies.any means all DSCP values or no DSCP marker.default means traffic with a DSCP value of 0. This is usually best effort trafficThe “af” entries stand for Assured Forwarding. The number following the “af” identifies one of four classes and one of three drop preferences. See Assured Forwarding (AF) PHB for DiffServ for more details.
ServiceThis is the name of the service object. any means all services.
Source PortThis is the name of a service object. The Zyxel Device applies the policy route to the packets sent from the corresponding service port. any means all service ports.
Next-HopThis is the next hop to which packets are directed. It helps forward packets to their destinations and can be a router, VPN tunnel, outgoing interface or trunk.
DSCP MarkingThis is how the Zyxel Device handles the DSCP value of the outgoing packets that match this route. If this field displays a DSCP value, the Zyxel Device applies that DSCP value to the route's outgoing packets.preserve means the Zyxel Device does not modify the DSCP value of the route's outgoing packets.default means the Zyxel Device sets the DSCP value of the route's outgoing packets to 0.The “af” choices stand for Assured Forwarding. The number following the “af” identifies one of four classes and one of three drop preferences. See Assured Forwarding (AF) PHB for DiffServ for more details.
SNAT This is the source IP address that the route uses.It displays none if the Zyxel Device does not perform NAT for this route.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

10.2.1 Policy Route Edit Screen

Click Configuration > Network > Routing to open the Policy Route screen. Then click the Add or Edit icon in the IPv4 Configuration or IPv6 Configuration section. The Add Policy Route or Policy Route Edit screen opens. Use this screen to configure or edit a policy route. Both IPv4 and IPv6 policy route have similar settings except the Address Translation (SNAT) settings.

Figure 222 Configuration > Network > Routing > Policy Route > Add/Edit (IPv4 Configuration)
Add Policy Route Show Advanced Settings Create new Object Configuration Enable Description: (Optional) Criteria User: any Incoming: any (Excluding ZyV Source Address: any Destination Address: any DSCP Code: any Schedule: none Service: any Next-Hop Type: Auto DSCP Marking DSCP Marking: preserve Address Translation Source Network Address Translation: outgoing-interface Advance Healthy Check Enable Connectivity Check Check Method: lamp Check Period: 5 (5-600 seconds) Check Timeout: 1 (1-10 seconds) Check Fall Tolerance: 1 (1-10) Check this address: (Domain Name or IP Address) OK Cancel

Figure 223 Configuration > Network > Routing > Policy Route > Add/Edit (IPv6 Configuration)
Add Policy Route Show Advanced Settings Create new Object▼ Configuration Enable Description: (Optional) Criteria User: any Incoming: any (Excluding ZyV Source Address: any Destination Address: any DSCP Code: any Schedule: none Service: any Advance Source Port: any Next-Hop Type: Auto DSCP Marking DSCP Marking: preserve OK Cancel

The following table describes the labels in this screen.

Table 130 Configuration > Network > Routing > Policy Route > Add/Edit

LABEL DESCRIPTION
Show Advanced Settings / Hide Advanced SettingsClick this button to display a greater or lesser number of configuration fields.
Create new ObjectUse this to configure any new settings objects that you need to use in this screen.
Configuration
Enable Select this to activate the policy.
DescriptionEnter a descriptive name of up to 31 printable ASCII characters for the policy.
Criteria
UserSelect a user name or user group from which the packets are sent.
IncomingSelect where the packets are coming from; any, an interface, a tunnel, an SSL VPN, or the Zyxel Device itself. For an interface, a tunnel, or an SSL VPN, you also need to select the individual interface, VPN tunnel, or SSL VPN connection.
Source AddressSelect a source IP address object, including geographic address and FQDN (group) objects, from which the packets are sent.
Destination AddressSelect a destination IP address object, including geographic address and FQDN (group) objects, to which the traffic is being sent. If the next hop is a dynamic VPN tunnel and you enable Auto Destination Address, the Zyxel Device uses the local network of the peer router that initiated an incoming dynamic IPSec tunnel as the destination address of the policy instead of your configuration here.
DSCP CodeSelect a DSCP code point value of incoming packets to which this policy route applies or selectUser Defineto specify another DSCP code point. The lower the number the higher the priority with the exception of 0 which is usually given only best-effort treatment.anymeans all DSCP value or no DSCP marker.defaultmeans traffic with a DSCP value of 0. This is usually best effort trafficThe "af" choices stand for Assured Forwarding. The number following the "af" identifies one of four classes and one of three drop preferences. SeeAssured Forwarding (AF) PHB for DiffServfor more details.
User-Defined DSCP CodeUse this field to specify a custom DSCP code point when you selectUser Definein the previous field.
ScheduleSelect a schedule to control when the policy route is active. nonemeans the route is active at all times if enabled.
ServiceSelect a service or service group to identify the type of traffic to which this policy route applies.
Source PortSelect a service or service group to identify the source port of packets to which the policy route applies.
Next-Hop
TypeSelectAutoto have the Zyxel Device use the routing table to find a next-hop and forward the matched packets automatically.SelectGatewayto route the matched packets to the next-hop router or switch you specified in theGatewayfield. You have to set up the next-hop router or switch as a HOST address object first.SelectVPN Tunnelto route the matched packets via the specified VPN tunnel.SelectTrunkto route the matched packets through the interfaces in the trunk group based on the load balancing algorithm.SelectInterfaceto route the matched packets through the specified outgoing interface to a gateway (which is connected to the interface).
GatewayThis field displays when you selectGatewayin theTypefield. Select a HOST address object. The gateway is an immediate neighbor of your Zyxel Device that will forward the packet to the destination. The gateway must be a router or switch on the same segment as your Zyxel Device's interface(s).
VPN TunnelThis field displays when you selectVPN Tunnelin theTypefield. Select a VPN tunnel through which the packets are sent to the remote network that is connected to the Zyxel Device directly.
Auto Destination AddressThis field displays when you selectVPN Tunnelin theTypefield. Select this to have the Zyxel Device use the local network of the peer router that initiated an incoming dynamic IPSec tunnel as the destination address of the policy.Leave this cleared if you want to manually specify the destination address.
TrunkThis field displays when you selectTrunkin theTypefield. Select a trunk group to have the Zyxel Device send the packets via the interfaces in the group.
InterfaceThis field displays when you selectInterfacein theTypefield. Select an interface to have the Zyxel Device send traffic that matches the policy route through the specified interface.
DSCP MarkingSet how the Zyxel Device handles the DSCP value of the outgoing packets that match this route.Select one of the pre-defined DSCP values to apply or selectUser Defineto specify another DSCP value. The "af" choices stand for Assured Forwarding. The number following the "af" identifies one of four classes and one of three drop preferences. SeeAssured Forwarding (AF) PHB for DiffServfor more details.Selectpreserveto have the Zyxel Device keep the packets' original DSCP value.Selectdefaultto have the Zyxel Device set the DSCP value of the packets to 0.
User-Defined DSCP MarkingUse this field to specify a custom DSCP value.
Address TranslationUse this section to configure NAT for the policy route. This section does not apply to policy routes that use a VPN tunnel as the next hop.
Source Network Address TranslationSelectnoneto not use NAT for the route.Selectoutgoing-interfaceto use the IP address of the outgoing interface as the source IP address of the packets that matches this route.To use SNAT for a virtual interface that is in the same WAN trunk as the physical interface to which the virtual interface is bound, the virtual interface and physical interface must be in different subnets.Otherwise, select a pre-defined address (group) to use as the source IP address(es) of the packets that match this route.UseCreate new Objectif you need to configure a new address (group) to use as the source IP address(es) of the packets that match this route.
Healthy CheckUse this part of the screen to configure a route connectivity check and disable the policy if the interface is down.
Disable policy route automatically while Interface link downSelect this to disable the policy if the interface is down or disabled. This is available forInterfaceand Trunkin theTypefield above.
Enable Connectivity CheckSelect this to turn on the connection check. This is available forInterfaceand Gatewayin theTypefield above.
Check Method: Selectthe method that the gateway allows.Select icmp to have the Zyxel Device regularly ping the gateway you specify to make sure it is still available.Select tcp to have the Zyxel Device regularly perform a TCP handshake with the gateway you specify to make sure it is still available.
Check Period:Enter the number of seconds between connection check attempts (5-600 seconds).
Check Timeout:Enter the number of seconds to wait for a response before the attempt is a failure (1-10 seconds).
Check Fail Tolerance:Enter the number of consecutive failures before the Zyxel Device stops routing using this policy (1-10).
Check Port:This field only displays when you set the Check Method to tcp. Specify the port number to use for a TCP connectivity check (1-65535).
Check this address:Select this to specify a domain name or IP address for the connectivity check. Enter that domain name or IP address in the field next to it.
OKClickOKto save your changes back to the Zyxel Device.
CancelClickCancelto exit this screen without saving.

10.3 IP Static Route Screen

Click Configuration > Network > Routing > Static Route to open the Static Route screen. This screen displays the configured static routes. Configure static routes to be able to use RIP or OSPF to propagate the routing information to other routers. If you enabled IPv6 in the Configuration > System > IPv6 screen, you can also configure static routes used for your IPv6 networks on this screen.

Figure 224 Configuration > Network > Routing > Static Route
Policy Route Static Route RIP OSPF BGP IPv4 Configuration + Add Edit Remove Destination Subnet Mask Next-Hop Metric Page 0 of 0 Show 50 items No data to display IPv6 Configuration + Add Edit Remove Destination Prefix Next-Hop Metric Page 0 of 0 Show 50 items No data to display

The following table describes the labels in this screen.

Table 131 Configuration > Network > Routing > Static Route

LABEL DESCRIPTION
IPv4 Configuration / IPv6 ConfigurationUse theIPv4 Configurationsection for IPv4 network settings. Use theIPv6 Configurationsection for IPv6 network settings if you connect your Zyxel Device to an IPv6 network. Both sections have similar fields as described below.
Add Click this to create a new static route.
EditDouble-click an entry or select it and clickEditto open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and clickRemove. The Zyxel Device confirms you want to remove it before doing so.
# This is the number of an individual static route.
Destination This is the destination IP address.
Subnet Mask This is the IP subnet mask.
Prefix This is the IPv6 prefix for the destination IP address.
Next-HopThis is the IP address of the next-hop gateway or the interface through which the traffic is routed. The gateway is a router or switch on the same segment as your Zyxel Device's interface(s). The gateway helps forward packets to their destinations.
MetricThis is the route's priority among the Zyxel Device's routes. The smaller the number, the higher priority the route has.

10.3.1 Static Route Add/Edit Screen

Select a static route index number and click Add or Edit. The screen shown next appears. Use this screen to configure the required information for a static route.

Figure 225 Configuration > Network > Routing > Static Route > Add (IPv4 Configuration)
IPv4 Static Route Setting Destination IP: Subnet Mask: Gateway IP Interface Metric: 0 OK Cancel

Figure 226 Configuration > Network > Routing > Static Route > Add (IPv6 Configuration)
IPv6 Static Route Setting Destination IP: Prefix Length: 64 (0-128) Gateway IP Interface sfp Metric: 0 (0-127)

The following table describes the labels in this screen.

Table 132 Configuration > Network > Routing > Static Route > Add

LABEL DESCRIPTION
Destination IPThis parameter specifies the IP network address of the final destination. Routing is always based on network number.If you need to specify a route to a single host, enter the specific IP address here and use a subnet mask of 255.255.255.255 (for IPv4) in the Subnet Mask field or a prefix of 128 (for IPv6) in the Prefix Length field to force the network number to be identical to the host ID.For IPv6, if you want to send all traffic to the gateway or interface specified in the Gateway IP or Interface field, enter :: in this field and 0 in the Prefix Length field.
Subnet Mask Enter the IP subnet mask here.
Prefix LengthEnter the number of left-most digits in the destination IP address, which indicates the network prefix. Enter :: in the Destination IP field and 0 in this field if you want to send all traffic to the gateway or interface specified in the Gateway IP or Interface field.
Gateway IPSelect the radio button and enter the IP address of the next-hop gateway. The gateway is a router or switch on the same segment as your Zyxel Device's interface(s). The gateway helps forward packets to their destinations.
InterfaceSelect the radio button and a predefined interface through which the traffic is sent.
MetricMetric represents the “cost” of transmission for routing purposes. IP routing uses hop count as the measurement of cost, with a minimum of 1 for directly connected networks. Enter a number that approximates the cost for this link. The number need not be precise, but it must be 0~127. In practice, 2 or 3 is usually a good number.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

10.4 Policy Routing Technical Reference

Here is more detailed information about some of the features you can configure in policy routing.

NAT and SNAT

NAT (Network Address Translation - NAT, RFC 1631) is the translation of the IP address in a packet in one network to a different IP address in another network. Use SNAT (Source NAT) to change the source IP address in one network to a different IP address in another network.

Assured Forwarding (AF) PHB for DiffServ

Assured Forwarding (AF) behavior is defined in RFC 2597. The AF behavior group defines four AF classes. Inside each class, packets are given a high, medium or low drop precedence. The drop precedence determines the probability that routers on the network will drop packets when congestion occurs. If congestion occurs between classes, the traffic in the higher class (smaller numbered class) is generally given priority. Combining the classes and drop precedence produces the following twelve DSCP encodings from AF11 through AF43. The decimal equivalent is listed in brackets.

Table 133 Assured Forwarding (AF) Behavior Group

CLASS 1 CLASS 2 CLASS 3CLASS 4
Low Drop PrecedenceAF11 (10)AF21 (18)AF31 (26)AF41 (34)
Medium Drop PrecedenceAF12 (12)AF22 (20)AF32 (28)AF42 (36)
High Drop PrecedenceAF13 (14)AF23 (22)AF33 (30)AF43 (38)

Maximize Bandwidth Usage

The maximize bandwidth usage option allows the Zyxel Device to divide up any available bandwidth on the interface (including unallocated bandwidth and any allocated bandwidth that a policy route is not using) among the policy routes that require more bandwidth.

When you enable maximize bandwidth usage, the Zyxel Device first makes sure that each policy route gets up to its bandwidth allotment. Next, the Zyxel Device divides up an interface's available bandwidth (bandwidth that is unbudgeted or unused by the policy routes) depending on how many policy routes require more bandwidth and on their priority levels. When only one policy route requires more bandwidth, the Zyxel Device gives the extra bandwidth to that policy route.

When multiple policy routes require more bandwidth, the Zyxel Device gives the highest priority policy routes the available bandwidth first (as much as they require, if there is enough available bandwidth), and then to lower priority policy routes if there is still bandwidth available. The Zyxel Device distributes the available bandwidth equally among policy routes with the same priority level.

10.5 Routing Protocols Overview

Routing protocols give the Zyxel Device routing information about the network from other routers. The Zyxel Device stores this routing information in the routing table it uses to make routing decisions. In turn, the Zyxel Device can also use routing protocols to propagate routing information to other routers.

Routing protocols are usually only used in networks using multiple routers like campuses or large enterprises.

  • Use the RIP screen (see Section 10.6 on page 337) to configure the Zyxel Device to use RIP to receive and/or send routing information.
  • Use the OSPF screen (see Section 10.7 on page 339) to configure general OSPF settings and manage OSPF areas.
  • Use the OSPF Area Add/Edit screen (see Section 10.7.2 on page 343) to create or edit an OSPF area.
  • Use the BGP screen (see Section 10.8 on page 346) to configure eBGP (exterior Border Gate Protocol).

10.5.1 What You Need to Know

The Zyxel Device supports two standards, RIP and OSPF, for routing protocols. RIP and OSPF are compared here and discussed further in the rest of the chapter.

Table 134 RIP vs. OSPF

RIP OSPF
Network Size Small (with up to 15 routers) Large
MetricHop countBandwidth, hop count, throughput, round trip time and reliability.
Convergence Slow Fast

10.6 The RIP Screen

RIP (Routing Information Protocol, RFC 1058 and RFC 1389) allows a device to exchange routing information with other routers. RIP is a vector-space routing protocol, and, like most such protocols, it uses hop count to decide which route is the shortest. Unfortunately, it also broadcasts its routes asynchronously to the network and converges slowly. Therefore, RIP is more suitable for small networks (up to 15 routers).

  • In the Zyxel Device, you can configure two sets of RIP settings before you can use it in an interface.
  • First, the Authentication field specifies how to verify that the routing information that is received is the same routing information that is sent.
  • Second, the Zyxel Device can also redistribute routing information from non-RIP networks, specifically OSPF networks and static routes, to the RIP network. Costs might be calculated differently, however, so you use the Metric field to specify the cost in RIP terms.
  • RIP uses UDP port 520.

Use the RIP screen to specify the authentication method and maintain the policies for redistribution.

Click Configuration > Network > Routing > RIP to open the following screen.

Figure 227 Configuration > Network > Routing > RIP
Policy Route Static Route RIP OSPF BGP General Settings Authentication: MD5 MD5 Authentication ID: (1..255) MD5 Authentication Key: Redistribute ✓ Active OSPF Metric: 1 (1-14) Apply Reset

The following table describes the labels in this screen.

Table 135 Configuration > Network > Routing Protocol > RIP

LABEL DESCRIPTION
AuthenticationThe transmitting and receiving routers must have the same key.For RIP, authentication is not available in RIP version 1. In RIP version 2, you can only select one authentication type for all interfaces.
AuthenticationSelect the authentication method used in the RIP network. This authentication protects the integrity, but not the confidentiality, of routing updates.None uses no authentication.Text uses a plain text password that is sent over the network (not very secure).MD5 uses an MD5 password and authentication ID (most secure).
Text Authentication KeyThis field is available if the Authentication is Text. Type the password for text authentication. The key can consist of alphanumeric characters and the underscore, and it can be up to 16 characters long.
MD5 Authentication IDThis field is available if the Authentication is MD5. Type the ID for MD5 authentication. The ID can be between 1 and 255.
MD5 Authentication KeyThis field is available if the Authentication is MD5. Type the password for MD5 authentication. The password can consist of alphanumeric characters and the underscore, and it can be up to 16 characters long.
Redistribute
Active OSPFSelect this to use RIP to advertise routes that were learned through OSPF.
MetricType the cost for routes provided by OSPF. The metric represents the “cost” of transmission for routing purposes. RIP routing uses hop count as the measurement of cost, with 1 usually used for directly connected networks. The number does not have to be precise, but it must be between 0 and 16. In practice, 2 or 3 is usually used.
ApplyClick this button to save your changes to the Zyxel Device.
Reset Click this button toreturn the screen to its last-saved settings.

10.7 The OSPF Screen

OSPF (Open Shortest Path First, RFC 2328) is a link-state protocol designed to distribute routing information within a group of networks, called an Autonomous System (AS). OSPF offers some advantages over vector-space routing protocols like RIP.

  • OSPF supports variable-length subnet masks, which can be set up to use available IP addresses more efficiently.
  • OSPF filters and summarizes routing information, which reduces the size of routing tables throughout the network.
  • OSPF responds to changes on the network, such as the loss of a router, more quickly.
  • OSPF considers several factors, including bandwidth, hop count, throughput, round trip time, and reliability, when it calculates the shortest path.
  • OSPF converges more quickly than RIP.

Naturally, OSPF is also more complicated than RIP, so OSPF is usually more suitable for large networks.

OSPF uses IP protocol 89.

OSPF Areas

An OSPF Autonomous System (AS) is divided into one or more areas. Each area represents a group of adjacent networks and is identified by a 32-bit ID. In OSPF, this number may be expressed as an integer or as an IP address.

There are several types of areas.

  • The backbone is the transit area that routes packets between other areas. All other areas are connected to the backbone.
  • A normal area is a group of adjacent networks. A normal area has routing information about the OSPF AS, any networks outside the OSPF AS to which it is directly connected, and any networks outside the OSPF AS that provide routing information to any area in the OSPF AS.
  • A stub area has routing information about the OSPF AS. It does not have any routing information about any networks outside the OSPF AS, including networks to which it is directly connected. It relies on a default route to send information outside the OSPF AS.
  • A Not So Stubby Area (NSSA, RFC 1587) has routing information about the OSPF AS and networks outside the OSPF AS to which the NSSA is directly connected. It does not have any routing information about other networks outside the OSPF AS.

Each type of area is illustrated in the following figure.

Figure 228 OSPF: Types of Areas
ZYXEL USGFLEX700-GB0101F - OSPF Areas - 1

flowchart
graph TD
    A["1"] --> B["X"]
    C["2"] --> D["0"]
    E["3"] --> F["Y"]

This OSPF AS consists of four areas, areas 0-3. Area 0 is always the backbone. In this example, areas 1, 2, and 3 are all connected to it. Area 1 is a normal area. It has routing information about the OSPF AS and networks X and Y. Area 2 is a stub area. It has routing information about the OSPF AS, but it depends on a default route to send information to networks X and Y. Area 3 is a NSSA. It has routing information about the OSPF AS and network Y but not about network X.

OSPF Routers

Every router in the same area has the same routing information. They do this by exchanging Hello messages to confirm which neighbor (layer-3) devices exist, and then they exchange database descriptions (DDs) to create a synchronized link-state database. The link-state database contains records of router IDs, their associated links and path costs. The link-state database is then constantly updated through Link State Advertisements (LSA). Each router uses the link state database and the Dijkstra algorithm to compute the least cost paths to network destinations.

Like areas, each router has a unique 32-bit ID in the OSPF AS, and there are several types of routers. Each type is really just a different role, and it is possible for one router to play multiple roles at one time.

  • An internal router (IR) only exchanges routing information with other routers in the same area.
  • An Area Border Router (ABR) connects two or more areas. It is a member of all the areas to which it is connected, and it filters, summarizes, and exchanges routing information between them.
  • An Autonomous System Boundary Router (ASBR) exchanges routing information with routers in networks outside the OSPF AS. This is called redistribution in OSPF.

Table 136 OSPF: Redistribution from Other Sources to Each Type of Area

SOURCE\ TYPE OF AREA NORMAL NSSA STUB
Static routes Yes Yes No
RIP Yes Yes Yes

- A backbone router (BR) has at least one interface with area 0. By default, every router in area 0 is a backbone router, and so is every ABR.

Each type of router is illustrated in the following example.

Figure 229 OSPF: Types of Routers
ZYXEL USGFLEX700-GB0101F - OSPF Routers - 1

flowchart
graph TD
    subgraph Segment 1
        A["IR"] --> B["1"]
        C["ABR"] --> D["1"]
        E["0"] --> F["3"]
    end
    subgraph Segment 2
        G["IR"] --> H["2"]
        I["ABR"] --> J["0"]
        K["BR"] --> L["3"]
    end
    subgraph Segment 3
        M["ASBR"] --> N["X"]
        O["ASBR"] --> P["Y"]
    end

In order to reduce the amount of traffic between routers, a group of routers that are directly connected to each other selects a designated router (DR) and a backup designated router (BDR). All of the routers only exchange information with the DR and the BDR, instead of exchanging information with all of the other routers in the group. The DR and BDR are selected by priority; if two routers have the same priority, the highest router ID is used.

The DR and BDR are selected in each group of routers that are directly connected to each other. If a router is directly connected to several groups, it might be a DR in one group, a BDR in another group, and neither in a third group all at the same time.

In some OSPF AS, it is not possible for an area to be directly connected to the backbone. In this case, you can create a virtual link through an intermediate area to logically connect the area to the backbone. This is illustrated in the following example.

Figure 230 OSPF: Virtual Link
100 10 0

In this example, area 100 does not have a direct connection to the backbone. As a result, you should set up a virtual link on both ABR in area 10. The virtual link becomes the connection between area 100 and the backbone.

You cannot create a virtual link to a router in a different area.

OSPF Configuration

Follow these steps when you configure OSPF on the Zyxel Device.

1 Enable OSPF.
2 Set up the OSPF areas.
3 Configure the appropriate interfaces. See Section 9.4.1 on page 237.
4 Set up virtual links, as needed.

10.7.1 Configuring the OSPF Screen

Use the first OSPF screen to specify the OSPF router the Zyxel Device uses in the OSPF AS and maintain the policies for redistribution. In addition, it provides a summary of OSPF areas, allows you to remove them, and opens the OSPF Add/Edit screen to add or edit them.

Click Configuration > Network > Routing > OSPF to open the following screen.

Figure 231 Configuration > Network > Routing > OSPF
Policy Route Static Route RIP(OSPF BGP General Settings OSPF Router ID (IP Address): User Defined Redistribute ✓ Active RIP Type: Type1 Metric: (0-16777214) Area Add Edit Remove References Area Type Authentication Page 0 of 0 Show 50 Items No data to display Apply Reset

The following table describes the labels in this screen. See Section 10.7.2 on page 343 for more information as well.

Table 137 Configuration > Network > Routing Protocol > OSPF

LABEL DESCRIPTION
OSPF Router ID Select the 32-bit ID the Zyxel Device uses in the OSPF AS.Default - the first available interface IP address is the Zyxel Device's ID.User Defined - enter the ID (in IP address format) in the field that appears when you select User Define.
Redistribute
Active RIPSelect this to advertise routes that were learned from RIP. The Zyxel Device advertises routes learned from RIP to Normal and NSSA areas but not to Stub areas.
TypeSelect how OSPF calculates the cost associated with routing information from RIP.Choices are: Type 1 and Type 2.Type 1 - cost = OSPF AS cost + external cost (Metric)Type 2 - cost = external cost (Metric); the OSPF AS cost is ignored.
MetricType the external cost for routes provided by RIP. The metric represents the “cost” of transmission for routing purposes. The way this is used depends on the Type field. This value is usually the average cost in the OSPF AS, and it can be between 1 and 16777214.
AreaThis section displays information about OSPF areas in the Zyxel Device.
Add Click this to create a new OSPF area.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry’s settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry. Click Refresh to update information on this screen.
#This field is a sequential value, and it is not associated with a specific area.
AreaThis field displays the 32-bit ID for each area in IP address format.
TypeThis field displays the type of area. This type is different from the Type field above.
AuthenticationThis field displays the default authentication method in the area.
ApplyClick this button to save your changes to the Zyxel Device.
Reset Click this button toreturn the screen to its last-saved settings.

10.7.2 OSPF Area Add/Edit Screen

The OSPF Area Add/Edit screen allows you to create a new area or edit an existing one. To access this screen, go to the OSPF summary screen (see Section 10.7 on page 339), and click either the Add icon or an Edit icon.

Figure 232 Configuration > Network > Routing > OSPF > Add
Add Area Area Setting Area ID: Type: Normal Authentication: MD5 MD5 Authentication ID: MD5 Authentication Key: Virtual Link Add Edit Remove Peer Router ID Authentication Page 0 of 0 Show 50 items No data to display OK Cancel

The following table describes the labels in this screen.

Table 138 Configuration > Network > Routing > OSPF > Add

LABEL DESCRIPTION
Area IDType the unique, 32-bit identifier for the area in IP address format.
Type Select the type of OSPF area.Normal- This area is a normal area. It has routing information about the OSPF AS and about networks outside the OSPF AS.Stub- This area is an stub area. It has routing information about the OSPF AS but not about networks outside the OSPF AS. It depends on a default route to send information outside the OSPF AS.NSSA- This area is a Not So Stubby Area (NSSA), per RFC 1587. It has routing information about the OSPF AS and networks that are outside the OSPF AS and are directly connected to the NSSA. It does not have information about other networks outside the OSPF AS.
AuthenticationSelect the default authentication method used in the area. This authentication protects the integrity, but not the confidentiality, of routing updates.Noneuses no authentication.Textuses a plain text password that is sent over the network (not very secure).MD5uses an MD5 password and authentication ID (most secure).
Text Authentication KeyThis field is available if the Authentication is Text. Type the password for text authentication. The key can consist of alphanumeric characters and the underscore, and it can be up to 16 characters long.
MD5 Authentication IDThis field is available if the Authentication is MD5. Type the default ID for MD5 authentication in the area. The ID can be between 1 and 255.
MD5 Authentication KeyThis field is available if the Authentication is MD5. Type the default password for MD5 authentication in the area. The password can consist of alphanumeric characters and the underscore, and it can be up to 16 characters long.
Virtual LinkThis section is displayed if the Type is Normal. Create a virtual link if you want to connect a different area (that does not have a direct connection to the backbone) to the backbone. You should set up the virtual link on the ABR that is connected to the other area and on the ABR that is connected to the backbone.
Add Click this to create a new virtual link.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
# This field is a sequential value, and it is not associated with a specific area.
Peer Router IDThis is the 32-bit ID (in IP address format) of the other ABR in the virtual link.
AuthenticationThis is the authentication method the virtual link uses. This authentication protects the integrity, but not the confidentiality, of routing updates.For OSPF, the Zyxel Device supports a default authentication type by area. If you want to use this default in an interface or virtual link, you set the associated Authentication Type field toSame as Area. As a result, you only have to update the authentication information for the area to update the authentication type used by these interfaces and virtual links. Alternatively, you can override the default in any interface or virtual link by selecting a specific authentication method. Please see the respective interface sections for more information.Noneuses no authentication.Textuses a plain text password that is sent over the network (not very secure). Hover your cursor over this label to display the password.MD5uses an MD5 password and authentication ID (most secure). Hover your cursor over this label to display the authentication ID and key.Same as Areahas the virtual link also use theAuthenticationsettings above.
OKClick OKto save your changes back to the Zyxel Device.
CancelClick Cancelto exit this screen without saving.

The Virtual Link Add/Edit screen allows you to create a new virtual link or edit an existing one. When the OSPF add or edit screen (see Section 10.7.2 on page 343) has the Type set to Normal, a Virtual Link table displays. Click either the Add icon or an entry and the Edit icon to display a screen like the following.

Figure 233 Configuration > Network > Routing > OSPF > Add > Add
Add Virtual Link Peer Router ID: Authentication: MD5 MD5 Authentication ID: (1-255) MD5 Authentication Key: OK Cancel

The following table describes the labels in this screen.

Table 139 Configuration > Network > Routing > OSPF > Add > Add

LABEL DESCRIPTION
Peer Router IDEnter the 32-bit ID (in IP address format) of the other ABR in the virtual link.
AuthenticationSelect the authentication method the virtual link uses. This authentication protects the integrity, but not the confidentiality, of routing updates.For OSPF, the Zyxel Device supports a default authentication type by area. If you want to use this default in an interface or virtual link, you set the associated Authentication Type field toSame as Area. As a result, you only have to update the authentication information for the area to update the authentication type used by these interfaces and virtual links. Alternatively, you can override the default in any interface or virtual link by selecting a specific authentication method. Please see the respective interface sections for more information.Noneuses no authentication.Textuses a plain text password that is sent over the network (not very secure).MD5uses an MD5 password and authentication ID (most secure).Same as Areahas the virtual link also use theAuthenticationsettings above.
Text Authentication KeyThis field is available if theAuthenticationist Text. Type the password for text authentication. The key can consist of alphanumeric characters and the underscore, and it can be up to 16 characters long.
MD5 Authentication IDThis field is available if theAuthenticationis MD5. Type the default ID for MD5 authentication in the area. The ID can be between 1 and 255.
MD5 Authentication KeyThis field is available if theAuthenticationis MD5. Type the default password for MD5 authentication in the area. The password can consist of alphanumeric characters and the underscore, and it can be up to 16 characters long.
OKClick OKto save your changes back to the Zyxel Device.
CancelClick Cancelto exit this screen without saving.

10.8 BGP (Border Gateway Protocol)

The Zyxel Device supports eBGP (exterior Border Gate Protocol) to route IPv4 traffic between routers in different Autonomous Systems (AS). An AS number is a number from 1 to 4294967295), that identifies an autonomous system. 420000000 – 4294967294 are private AS numbers.

See Section 10.7 on page 339 for more information on autonomous systems.

Figure 234 eBGP Concept
ZYXEL USGFLEX700-GB0101F - BGP (Border Gateway Protocol) - 1

flowchart
graph LR
    AS100["AS100"] --> A["A"]
    A --> B["B"]
    B --> AS200["AS200"]

10.8.1 Allow BGP Packets to Enter the Zyxel Device

You must first allow BGP packets to enter the Zyxel Device from the WAN.

1 Go to Configuration > Object > Service > Service Group
2 Select the Default_Allow_WAN_To_ZyWALL rule and click Edit.
3 Move BGP from Available to Member.

4 Click OK.

Figure 235 Allow BGP to the Zyxel Device
Edit Service Group Rule Default_Allow_WAN_To_ZyWALL Configuration Name: Default_Allow_WAN_ Description: System Default Allow Configuration Available === Object === AIM AUTH Any_TCP Any_UDP BONJOUR BOOTP_CLIENT BOOTP_SERVER CAPWAP-CONTROL Member === Object === AH ESP GRE IKE NATT VRRP BGP OK Cancel

10.8.2 Configuring the BGP Screen

Use this screen to configure BGP information about the Zyxel Device and its peer BGP routers.

Click Configuration > Network > Routing > BGP to open the following screen.

Figure 236 Configuration > Network > Routing > BGP
Policy Route Static Route RIP(OSPF) BGP General Settings AS Number: 0 Router ID: Redistribute: Connected Neighbors Add Edit Remove IP Address AS Number Page 0 of 0 Show 50 items No data to display Network Add Edit Remove Network Page 0 of 0 Show 50 items No data to display Apply Reset

The following table describes the labels in this screen.

Table 140 Configuration > Network > Routing Protocol > BGP

LABEL DESCRIPTION
AS Number Type a numberfrom 1 to 4294967295 in this field.Note: The Zyxel Device can only belong to one AS at a time.
Router IDType the IP address of the interface on the Zyxel Device. This field is optional.
RedistributeSelect Connected to redistribute routes of directly attached devices to the Zyxel Device into the BGP Routing Information Base (RIB).
NeighborsThis section displays information about peer BGP routers in neighboring AS'.Note: The maximum number of neighboring BGP routers supported by the Zyxel Device is 5.
AddClick this to configure BGP criteria for a new peer BGP router.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
#This field is a sequential value, and it is not associated with a specific area.
IP AddressThis displays the IPv4 address of the peer BGP router in a neighboring AS.
AS NumberThis displays the AS Number of the peer BGP router in a neighboring AS.
NetworkUse this section to add routes that will be announced to all BGP neighbors.Note: You may configure up to 16 network routes.
AddClick this to configure network information for a new route.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
#This field is a sequential value, and it is not associated with a specific area.
NetworkThis displays the IP address and the number of subnet mask bits for the peer BGP route.
ApplyClick this button to save your changes to the Zyxel Device.
Reset Click this button toreturn the screen to its last-saved settings.

10.8.3 The BGP Neighbors Screen

Use this screen to configure BGP information about a peer BGP router.

Click Configuration > Network > Routing > BGP > Add Neighbors to open the following screen.

Figure 237 Configuration > Network > Routing > BGP > Add Neighbors
Add Neighbors General Settings IP Address: AS Number: Enable EBGP Multihop EBGP Maximum Hops: 255 Update Source: None MD5 Authentication Key: Weight: Keepalive Time: 60 Hold Time: 180 Maximum Prefix: 75 OK Cancel

The following table describes the labels in this screen.

Table 141 Configuration > Network > Routing Protocol > BGP

LABEL DESCRIPTION
IP AddressType the IP address of the interface on the peer BGP router.
AS NumberType a number from 1 to 4294967295 in this field. Get the number from your service provider.
Enable EBGP MultihopSelect this to allow the Zyxel Device to attempt BGP connections to external peers on indirectly connected networks. eBGP neighbors must also perform multihop. Multihop is not established if the only route to the multihop peer is a default route. This avoids loop formation.
EBGP Maximum HopsEnter a maximum hop count from <1-255>. The default is 255.
Update SourceUse this to allow BGP sessions use the selected interface for TCP connections.· C h o o s e Gateway and then enter the gateway IP address· Choose Interface and then select a Zyxel Device interface.· C h o o s e None to use the closest interface.
MD5 authentication keyType the default password for MD5 authentication of communication between the Zyxel Device and the peer BGP router. The password can consist of alphanumeric characters and the underscore, and it can be up to 63 characters long.
WeightSpecify a weight value for all routes learned from this peer BGP router in the specified network. The route with the highest weight gets preference.
Keepalive TimeKeepalive messages are sent by the Zyxel Device to a peer BGP router to inform it that the BGP connection between the two is still active. The Keepalive Time is the interval between each Keepalive message sent by the Zyxel Device. We recommend Keepalive Time is 1/3 of the Hold Time time.
Hold TimeThis is the maximum time the Zyxel Device waits to receive a Keepalive message from a peer BGP router before it declares that the peer BGP router is dead. Hold Time must be greater than the Keepalive Time.
Maximum PrefixA prefix is a network address (IP/subnet mask) that a BGP router can reach and that it shares with its neighbors. Set the maximum number, from 1 to 4294967295, of prefixes that can be received from a neighbor. This limits the number of prefixes that the Zyxel Device is allowed to receive from a neighbor. If extra prefixes are received, the Zyxel Device ends the connection with the peer BGP router. You need to edit the peer BGP router configuration to bring the connection back.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

10.8.4 Example Scenario

This is an example scenario for using BGP on the Zyxel Device.

10.8.4.1 Scenario: CE - PE (MLPS)

In this scenario, you want to transmit BGP packets from a CE router (Zyxel Device) to a peer BGP PE router in an MPLS network.

  • CE: The Zyxel Device is the customer edge router located on the customer premises and connects to a PE router in the service provider MPLS network.
  • PE: The provider edge router is located at the edge of the service provider MPLS network.
  • MPLS: MultiProtocol Label Switching (MPLS) forwards data from one network node to the next based on path labels rather than network addresses.

Figure 238 Scenario 1: CE Router - to - MPLS
ZYXEL USGFLEX700-GB0101F - Scenario: CE - PE (MLPS) - 1

flowchart
graph TD
    A["AS 64521"] -->|CE| B["MPLS Network"]
    C["AS 64522"] -->|CE| B
    D["AS 64523"] -->|CE| B
    B --> E["PE"]
    B --> F["PE"]

10.8.4.2 CE - PE Configuration Process

The process for configuring BGP in this scenario is:

1 Configure the AS number for BGP on the Zyxel Device (CE) in Configuration > Network > Routing > BGP.

Note: The Zyxel Device can only belong to one AS at a time.

2 Configure the AS number and BGP criteria of the peer BGP routers (PE) in the neighboring AS in Configuration > Network > Routing > BGP > Add Neighbors.

Note: The maximum number of neighboring BGP routers supported by the Zyxel Device is 5.

3 Configure the network for BGP routes in the neighboring AS.

Note: You may configure up to 16 network routes.

CHAPTER 11 DDNS

11.1 DDNS Overview

Dynamic DNS (DDNS) services let you use a domain name with a dynamic IP address.

11.1.1 What You Can Do in this Chapter

  • Use the DDNS screen (see Section 11.2 on page 353) to view a list of the configured DDNS domain names and their details.
  • Use the DDNS Add/Edit screen (see Section 11.2.1 on page 354) to add a domain name to the Zyxel Device or to edit the configuration of an existing domain name.

11.1.2 What You Need to Know

DNS maps a a FQDN (Fully Qualified Domain Name) to a corresponding IP address and vice versa. Similarly, Dynamic DNS (DDNS) maps a domain name to a dynamic IP address. As a result, anyone can use the domain name to contact you (in NetMeeting, CU-SeeMe, etc.) or to access your FTP server or Web site, regardless of the current (dynamic) IP address.

Note: You must have a public WAN IP address to use Dynamic DNS.

You must set up a dynamic DNS account with a supported DNS service provider before you can use Dynamic DNS services with the Zyxel Device. When registration is complete, the DNS service provider gives you a password or key. At the time of writing, the Zyxel Device supports the following DNS service providers. See the listed websites for details about the DNS services offered by each.

Table 142 DDNS Service Providers

PROVIDER SERVICETYPES SUPPORTED WEBSITE
DynDNS Dynamic DNS, Static DNS, and Custom DNS www.dyndns.com
Dynu Basic, Premium www.dynu.com
No-IP No-IP www.no-ip.com
Peanut Hull PeanutHull www.oray.cn
3322 3322 DynamicDNS, 3322 Static DNS www.3322.org
SelfhostSelfhostselfhost.de

Note: Record your DDNS account's user name, password, and domain name to use to configure the Zyxel Device.

After you configure the Zyxel Device, it automatically sends updated IP addresses to the DDNS service provider, which helps redirect traffic accordingly.

11.2 The DDNS Screen

The DDNS screen provides a summary of all DDNS domain names and their configuration. In addition, this screen allows you to add new domain names, edit the configuration for existing domain names, and delete domain names. Click Configuration > Network > DDNS to open the following screen.

Figure 239 Configuration > Network > DDNS
DDNS Profile Summary Add Edit Remove Activate Inactivate Status Profile Name DDNS Type Domain Name Primary Interface/IP Backup Interface/IP Page 0 of 0 Show 50 Items No data to display Apply Reset

The following table describes the labels in this screen.

Table 143 Configuration > Network > DDNS

LABEL DESCRIPTION
Add Click this to createa new entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
# This is the number of an individual DDNS profile.
StatusThis icon is lit when the entry is active and dimmed when the entry is inactive.
Profile NameThis field displays the descriptive profile name for this entry.
DDNS Type This field displays which DDNS service you are using.
Domain Name This field displays each domain name the Zyxel Device can route.
Primary Interface/IPThis field displays the interface to use for updating the IP address mapped to the domain name followed by how the Zyxel Device determines the IP address for the domain name.from interface- The IP address comes from the specified interface.auto detected-The DDNS server checks the source IP address of the packets from the Zyxel Device for the IP address to use for the domain name.custom- The IP address is static.
Backup Interface/IPThis field displays the alternate interface to use for updating the IP address mapped to the domain name followed by how the Zyxel Device determines the IP address for the domain name. The Zyxel Device uses the backup interface and IP address when the primary interface is disabled, its link is down or its connectivity check fails.from interface- The IP address comes from the specified interface.auto detected-The DDNS server checks the source IP address of the packets from the Zyxel Device for the IP address to use for the domain name.custom- The IP address is static.
Apply Click this button to save your changes to the Zyxel Device.
Reset Click this button to return the screen to its last-saved settings.

11.2.1 The Dynamic DNS Add/Edit Screen

The DDNS Add/Edit screen allows you to add a domain name to the Zyxel Device or to edit the configuration of an existing domain name. Click Configuration > Network > DDNS and then an Add or Edit icon to open this screen.

Figure 240 Configuration > Network > DDNS > Add
Add Profile Hide Advanced Settings General Settings Enable DDNS Profile Profile Name: DDNS Type: DynDNS HTTPS DDNS Account Username: Password: Retype to Confirm: DDNS Settings Domain Name: Primary Binding Address Interface: wan1 IP Address: Interface Backup Binding Address Interface: none Advance Enable Wildcard Mail Exchanger: (Optional) Backup Mail Exchanger OK Cancel

Figure 241 Configuration > Network > DDNS > Add - Custom
Add Profile General Settings Enable DDNS Profile Profile Name: DDNS Type: User custom HTTPS DDNS Account Username: Password: Retype to Confirm: DDNS Settings Domain Name: Primary Binding Address Interface: wan1 Backup Binding Address Interface: none DYNDNS Server: URL: Additional DDNS Options: Advance Enable Wildcard Mail Exchanger: (Optional) Backup Mail Exchanger OK Cancel

The following table describes the labels in this screen.

Table 144 Configuration > Network > DDNS > Add

LABEL DESCRIPTION
Show Advanced Settings / Hide Advanced SettingsClick this button to display a greater or lesser number of configuration fields.
Enable DDNS ProfileSelect this check box to use this DDNS entry.
Profile NameWhen you are adding a DDNS entry, type a descriptive name for this DDNS entry in the Zyxel Device. You may use 1-31 alphanumeric characters, underscores( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive.This field is read-only when you are editing an entry.
DDNS Type Select the type of DDNS service you are using.Select User custom to create your own DDNS service and configure the DYNDNS Server, URL, and Additional DDNS Options fields below.
HTTPSSelect this to encrypt traffic using SSL (port 443), including traffic with username and password, to the DDNS server. Not all DDNS providers support this option.
UsernameType the user name used when you registered your domain name. You can use up to 31 alphanumeric characters and the underscore. Spaces are not allowed.For a Dynu DDNS entry, this user name is the one you use for logging into the service, not the name recorded in your personal information in the Dynu website.
PasswordType the password provided by the DDNS provider. You can use up to 64 alphanumeric characters and the underscore. Spaces are not allowed.
Retype to Confirm Typethe password again to confirm it.
DDNS Settings
Domain nameType the domain name you registered. You can use up to 255 characters.
Primary Binding AddressUse these fields to set how the Zyxel Device determines the IP address that is mapped to your domain name in the DDNS server. The Zyxel Device uses the Backup Binding Address if the interface specified by these settings is not available.
InterfaceSelect the interface to use for updating the IP address mapped to the domain name. Select Any to let the domain name be used with any interface.
IP Address The optionsavailable in this field vary by DDNS provider. Interface -The Zyxel Device uses the IP address of the specified interface. This option appears when you select a specific interface in the Primary Binding Address Interface field. Auto -If the interface has a dynamic IP address, the DDNS server checks the source IP address of the packets from the Zyxel Device for the IP address to use for the domain name. You may want to use this if there are one or more NAT routers between the Zyxel Device and the DDNS server. Note: The Zyxel Device may not determine the proper IP address if there is an HTTP proxy server between the Zyxel Device and the DDNS server. Custom -If you have a static IP address, you can select this to use it for the domain name. The Zyxel Device still sends the static IP address to the DDNS server.
Custom IPThis field is only available when the IP Address is Custom. Type the IP address to use for the domain name.
Backup Binding AddressUse these fields to set an alternate interface to map the domain name to when the interface specified by the Primary Binding Interface settings is not available.
InterfaceSelect the interface to use for updating the IP address mapped to the domain name. Select Any to let the domain name be used with any interface. Select None to not use a backup address.
IP Address The optionsavailable in this field vary by DDNS provider. Interface -The Zyxel Device uses the IP address of the specified interface. This option appears when you select a specific interface in the Backup Binding Address Interface field. Auto -The DDNS server checks the source IP address of the packets from the Zyxel Device for the IP address to use for the domain name. You may want to use this if there are one or more NAT routers between the Zyxel Device and the DDNS server. Note: The Zyxel Device may not determine the proper IP address if there is an HTTP proxy server between the Zyxel Device and the DDNS server. Custom -If you have a static IP address, you can Select this to use it for the domain name. The Zyxel Device still sends the static IP address to the DDNS server.
Custom IPThis field is only available when the IP Address is Custom. Type the IP address to use for the domain name.
Enable Wildcard This optionis only available with a DynDNS account. Enable the wildcard feature to alias subdomains to be aliased to the same IP address as your (dynamic) domain name. This feature is useful if you want to be able to use, for example, www.yourhost.dyndns.org and still reach your hostname.
Mail Exchanger This option is only available with a DynDNS account.DynDNS can route email for your domain name to a mail server (called a mail exchanger). For example, DynDNS routes email forjohn-doe@yourhost.dyndns.orgto the host record specified as the mail exchanger.If you are using this service, type the host record of your mail server here. Otherwise leave the field blank.Seewww.dyndns.orgfor more information about mail exchangers.
Backup Mail ExchangerThis option is only available with a DynDNS account.Select this check box if you are using DynDNS’s backup service for email. With this service, DynDNS holds onto your email if your mail server is not available. Once your mail server is available again, the DynDNS server delivers the mail to you. See www.dyndns.org for more information about this service.
DYNDNS ServerThis field displays when you selectUser customfrom theDDNStypefield above. Type the IP address of the server that will host the DDSN service.
URLThis field displays when you selectUser customfrom theDDNStypefield above. Type the URL that can be used to access the server that will host the DDSN service.
Additional DDNS OptionsThis field displays when you selectUser customfrom theDDNStypefield above. These are the options supported at the time of writing:dyndns_system to specify the DYNDNS Server type - for example, dyndns@dyndns.orgip_server_name which should be the URL to get the server’s public IP address - for example, http://myip.easylife.tw/
OKClickOKto save your changes back to the Zyxel Device.
CancelClickCancelto exit this screen without saving.

CHAPTER 12 NAT

12.1 Overview

  • Use the Network > NAT screen (Section 12.2 on page 358) to enable and configure network address translation.
  • Use the Network > NAT > Virtual Server Load Balancing screen (Section 12.5 on page 366) to distribute local user connections over multiple servers, in order to reduce each server's workload and to decrease overall response times.

12.2 NAT Overview

NAT (Network Address Translation - NAT, RFC 1631) is the translation of the IP address of a host in a packet. For example, the source address of an outgoing packet, used within one network is changed to a different IP address known within another network. Use Network Address Translation (NAT) to make computers on a private network behind the Zyxel Device available outside the private network. If the Zyxel Device has only one public IP address, you can make the computers in the private network available by using ports to forward packets to the appropriate private IP address.

Suppose you want to assign ports 21-25 to one FTP, Telnet and SMTP server (A in the example), port 80 to another (B in the example) and assign a default server IP address of 192.168.1.35 to a third (C in the example). You assign the LAN IP addresses and the ISP assigns the WAN IP address. The NAT network appears as a single host on the Internet.

Figure 242 Multiple Servers Behind NAT Example
ZYXEL USGFLEX700-GB0101F - NAT Overview - 1

flowchart
graph LR
    A["Router"] -->|A = 192.168.1.33| B["Computer"]
    B --> C["LAN"]
    C --> D["Router"]
    D --> E["Internet"]
    C --> F["Computer"]
    C --> G["Computer"]
    C --> H["Computer"]
    C --> I["Computer"]
    style A fill:#cce5ff,stroke:#333
    style B fill:#cce5ff,stroke:#333
    style C fill:#cce5ff,stroke:#333
    style D fill:#ffcccc,stroke:#333
    style E fill:#ffffff,stroke:#333
    style F fill:#ffffff,stroke:#333
    style G fill:#ffffff,stroke:#333
    style H fill:#ffffff,stroke:#333
    style I fill:#ffffff,stroke:#333

12.2.1 What You Can Do in this Chapter

Use the NAT screens (see Section 12.3 on page 360) to view and manage the list of NAT rules and see their configuration details. You can also create new NAT rules and edit or delete existing ones.

12.2.2 What You Need to Know

NAT is also known as virtual server, port forwarding, or port translation.

Well-known Ports

Port numbers range from 0 to 65535, but only port numbers 0 to 1023 are reserved for privileged services and designated as well-known ports. The following list specifies the ports used by the server process as its contact ports. See Section 39.7 on page 774 (Configuration > Object > Service) for more information about service objects.

• Well-known ports range from 0 to 1023.
- Registered ports range from 1024 to 49151.
• Dynamic ports (also called private ports) range from 49152 to 65535.

Table 145 Well-known Ports

PORT TCP/UDP DESCRIPTION
1 TCP TCP Port Service Multiplexer (TCPMUX)
20TCPFTP - Data
21 TCP FTP - Control
22 TCP SSH Remote Login Protocol
23 TCP Telnet
25 TCP Simple Mail Transfer Protocol (SMTP)
42 UDP Host Name Server (Nameserv)
43 TCP Whols
53 TCP/UDP Domain Name System (DNS)
67 UDP BOOTP/DHCP server
68 UDP BOOTP/DHCP client
69 UDP Trivial File Transfer Protocol (TFTP)
79 TCP Finger
80 TCP HTTP
110 TCP POP3
119 TCP Newsgroup (NNTP)
123 UDP Network Time Protocol (NTP)
135 TCP/UDP RPC Locator service
137 TCP/UDP NetBIOS Name Service
138 UDP NetBIOS Datagram Service
139 TCP NetBIOS Datagram Service
143 TCP Interim Mail Access Protocol (IMAP)
161 UDP SNMP
179 TCP Border Gateway Protocol (BGP)
389TCP/UDPLightweight Directory Access Protocol (LDAP)
443 TCP HTTPS
445 TCP Microsoft - DS
636 TCP LDAP over TLS/SSL (LDAPS)
953 TCP BIND DNS

Table 145 Well-known Ports

PORT TCP/UDP DESCRIPTION
990 TCPFTP over TLS/SSL (FTPS)
995 TCPPOP3 over TLS/SSL (POP3S)

12.3 The NAT Screen

The NAT summary screen provides a summary of all NAT rules and their configuration. In addition, this screen allows you to create new NAT rules and edit and delete existing NAT rules. To access this screen, login to the Web Configurator and click Configuration > Network > NAT. The following screen appears, providing a summary of the existing NAT rules.

Click on the icons to go to the OneSecurity website where there is guidance on configuration walkthroughs, troubleshooting, and other information.

Figure 243 Configuration > Network > NAT
NAT Configuration Configuration Walkthrough Troubleshooting Use Static-Dynamic Route to Control 1-1 NAT Route Note: If you want to configure SNAT, please go to Policy Route. Add Edit Remove Activate Inactivate Move St... Pri... Name Mappi... Interface Source IP Externa... Internal... Protocol Externa... Interna... Page 0 of 0 Show 50 items No data to display Apply Reset

The following table describes the labels in this screen.

Table 146 Configuration > Network > NAT

LABEL DESCRIPTION
Use Static-Dynamic Route to Control 1-1 NAT RouteIf you are using SiteToSite VPN and 1-1 SNAT, it's recommended that you select this check box. Otherwise, you'll need to create policy route rules for VPN and Destination NAT traffic.Note that the selection of this check box will change the priority of the routing flow (SiteToSite VPN, Static-Dynamic Route, and 1-1 SNAT). See Chapter 46 on page 952 for more information about the routing flow.
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
MoveTo change a rule's position in the numbered list, select the rule and click Move to display a field to type a number for where you want to put that rule and press [ENTER] to move the rule to the number that you typed.The ordering of your rules is important as they are applied in order of their numbering.
# This field is a sequential value, and it is not associated with a specific entry.
Status This icon is lit when the entry is active and dimmed when the entry is inactive.
PriorityThis field displays the priority for the entry. The smaller the number, the higher the priority.
Name This field displays the name of the entry.
Mapping TypeThis field displays what kind of NAT this entry performs:Virtual Server, 1:1 NAT, or Many 1:1 NAT.
InterfaceThis field displays the interface on which packets for the NAT entry are received.
Source IPThis field displays the source IP address (or address object) of traffic that matches this NAT entry. It displaysanyif there is no restriction on the source IP address.
External IPThis field displays the original destination IP address (or address object) of traffic that matches this NAT entry. It displaysanyif there is no restriction on the original destination IP address.
Internal IP This field displays the new destination IP address for the packet.
ProtocolThis field displays the service used by the packets for this NAT entry. It displaysanyif there is no restriction on the services.
External PortThis field displays the original destination port(s) of packets for the NAT entry. This field is blank if there is no restriction on the original destination port.
Internal PortThis field displays the new destination port(s) for the packet. This field is blank if there is no restriction on the original destination port.
Apply Click this button to save your changes to the Zyxel Device.
Reset Click this button to return the screen to its last-saved settings.

12.3.1 The NAT Add/Edit Screen

The NAT Add/Edit screen lets you create new NAT rules and edit existing ones. To open this window, open the NAT summary screen. (See Section 12.3 on page 360.) Then, click on an Add icon or Edit icon to open the following screen.

Figure 244 Configuration > Network > NAT > Add
Create New Object General Settings Enable Rule Rule Name: Port Mapping Type Classification: Virtual Server 1:1 NAT Many 1:1 NAT Mapping Rule Incoming Interface: wan Source IP: any External IP: User Defined User-Defined External IP: IP Address Internal IP: User Defined User-Defined Internal IP: IP Address Port Mapping Type: any Related Settings Enable NAT Loopback Configure Security Policy OK Cancel

The following table describes the labels in this screen.

Table 147 Configuration > Network > NAT > Add

LABEL DESCRIPTION
Create new ObjectUse to configure any new settings objects that you need to use in this screen.
Enable Rule Use this option to turn the NAT rule on or off.
Rule NameType in the name of the NAT rule. The name is used to refer to the NAT rule. You may use 1-31 alphanumeric characters, underscores( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive.
Classification Select what kind of NAT this rule is to perform.
Source IPSpecify the source IP address of the packets received by this NAT rule's specified incoming interface.any- Select this to use all of the incoming interface's IP addresses including dynamic addresses or those of any virtual interfaces built upon the selected incoming interface.User Defined- Select this to manually enter an IP address in theUser Definedfield. For example, you could enter a static IP address.Host address - select a address object to use the IP address it specifies.
External IPSpecify the destination IP address of the packets received by this NAT rule's specified incoming interface. The specified IP address will be translated to theInternal IPaddress.any- Select this to use all of the incoming interface's IP addresses including dynamic addresses or those of any virtual interfaces built upon the selected incoming interface.User Defined- Select this to manually enter an IP address in theUser Definedfield. For example, you could enter a static public IP assigned by the ISP without having to create a virtual interface for it.Host address - select a host address object to use the IP address it specifies. The list also includes address objects based on interface IPs. So for example you could select an address object based on a WAN interface even if it has a dynamic IP address.
User Defined External IPThis field is available ifExternal IPis User Defined.Type the destination IP address that this NAT rule supports.
External IP Subnet/RangeThis field displays forMany 1:1 NAT. Select the destination IP address subnet or IP address range that this NAT rule supports. The original and mapped IP address subnets or ranges must have the same number of IP addresses.
Internal IPSelect to which translated destination IP address this NAT rule forwards packets.User Defined- this NAT rule supports a specific IP address, specified in theUser Definedfield.HOST address - the drop-down box lists all the HOST address objects in the Zyxel Device. If you select one of them, this NAT rule supports the IP address specified by the address object.
User Defined Internal IPThis field is available ifInternal IPis User Defined.Type the translated destination IP address that this NAT rule supports.
Internal IP Subnet/RangeThis field displays forMany 1:1 NAT. Select to which translated destination IP address subnet or IP address range this NAT rule forwards packets. The original and mapped IP address subnets or ranges must have the same number of IP addresses.
Port Mapping TypeUse the drop-down list box to select how many original destination ports this NAT rule supports for the selected destination IP address (Original IP). Choices are:Any- this NAT rule supports all the destination ports.Port- this NAT rule supports one destination port.Ports- this NAT rule supports a range of destination ports. You might use a range of destination ports for unknown services or when one server supports more than one service.Service- this NAT rule supports a service such as FTP (seeObject > Service > Service)Service-Group- this NAT rule supports a group of services such as all service objects related to DNS (seeObject > Service > Service Group)
Protocol TypeThis field is available ifMapping Typeis Port or Ports. Select the protocol (TCP, UDP, or Any) used by the service requesting the connection.
External PortThis field is available ifMapping Typeis Port.Enter the external destination port this NAT rule supports.
Internal PortThis field is available ifMapping Typeis Port.Enter the translated destination port if this NAT rule forwards the packet.
External Start PortThis field is available ifMapping TypeisPorts.Enter the beginning of the range of original destination ports this NAT rule supports.
External End PortThis field is available ifMapping TypeisPorts.Enter the end of the range of original destination ports this NAT rule supports.
Internal Start PortThis field is available ifMapping TypeisPorts.Enter the beginning of the range of translated destination ports if this NAT rule forwards the packet.
Internal End PortThis field is available ifMapping TypeisPorts.Enter the end of the range of translated destination ports if this NAT rule forwards the packet. The original port range and the mapped port range must be the same size.
Enable NAT LoopbackEnable NAT loopback to allow users connected to any interface (instead of just the specifiedIncoming Interface) to use the NAT rule’s specifiedExternal IPaddress to access theInternal IPdevice. For users connected to the same interface as theInternal IPdevice, the Zyxel Device uses that interface’s IP address as the source address for the traffic it sends from the users to theInternal IPdevice.For example, if you configure a NAT rule to forward traffic from the WAN to a LAN server, enabling NAT loopback allows users connected to other interfaces to also access the server. For LAN users, the Zyxel Device uses the LAN interface’s IP address as the source address for the traffic it sends to the LAN server. SeeNAT Loopback on page 364for more details.If you do not enable NAT loopback, this NAT rule only applies to packets received on the rule’s specified incoming interface.
Security PolicyBy default the security policy blocks incoming connections from external addresses. After you configure your NAT rule settings, click theSecurity Policylink to configure a security policy to allow the NAT rule’s traffic to come in.The Zyxel Device checks NAT rules before it applies To-Zyxel Device security policies, so To-Zyxel Device security policies, do not apply to traffic that is forwarded by NAT rules. The Zyxel Device still checks other security policies, according to the source IP address and mapped IP address.
OKClickOKto save your changes back to the Zyxel Device.
CancelClickCancelto return to theNATsummary screen without creating the NAT rule (if it is new) or saving any changes (if it already exists).

12.4 NAT Technical Reference

Here is more detailed information about NAT on the Zyxel Device.

NAT Loopback

Suppose an NAT 1:1 rule maps a public IP address to the private IP address of a LAN SMTP email server to give WAN users access. NAT loopback allows other users to also use the rule's original IP to access the mail server.

For example, a LAN user's computer at IP address 192.168.1.89 queries a public DNS server to resolve the SMTP server's domain name (xxx.LAN-SMTP.com in this example) and gets the SMTP server's mapped public IP address of 1.1.1.1.

Figure 245 LAN Computer Queries a Public DNS Server
ZYXEL USGFLEX700-GB0101F - NAT Loopback - 1

flowchart
graph TD
    A["DNS"] -->|xxx.LAN-SMTP.com = 1.1.1.1| B["LAN"]
    C["192.168.1.21"] --> B
    D["192.168.1.89"] --> B
    B --> E["..."]
    style A fill:#cce5ff,stroke:#333
    style C fill:#cce5ff,stroke:#333
    style D fill:#cce5ff,stroke:#333
    style B fill:#ffcccc,stroke:#333
    style E fill:#ffffff,stroke:#333

The LAN user's computer then sends traffic to IP address 1.1.1.1. NAT loopback uses the IP address of the Zyxel Device's LAN interface (192.168.1.1) as the source address of the traffic going from the LAN users to the LAN SMTP server.

Figure 246 LAN to LAN Traffic
ZYXEL USGFLEX700-GB0101F - NAT Loopback - 2

flowchart
graph TD
    A["NAT"] -->|Source 192.168.1.1| B["LAN"]
    A -->|Source 192.168.1.89| C["Computer"]
    B -->|192.168.1.21| C
    B -->|192.168.1.89| C
    A -.->|...| A

The LAN SMTP server replies to the Zyxel Device's LAN IP address and the Zyxel Device changes the source address to 1.1.1.1 before sending it to the LAN user. The return traffic's source matches the original destination address (1.1.1.1). If the SMTP server replied directly to the LAN user without the traffic going through NAT, the source would not match the original destination address which would cause the LAN user's computer to shut down the session.

Figure 247 LAN to LAN Return Traffic
ZYXEL USGFLEX700-GB0101F - NAT Loopback - 3

flowchart
graph TD
    A["NAT"] -->|Source 192.168.1.21| B["LAN"]
    A -->|Source 1.1.1.1| C["Computer"]
    B -->|192.168.1.21| A
    C -->|192.168.1.89| A
    B --> D["SMTP"]
    C --> E["SMTP"]
    style A fill:#f9f,stroke:#333
    style B fill:#bbf,stroke:#333
    style C fill:#bbf,stroke:#333
    style D fill:#dfd,stroke:#333
    style E fill:#dfd,stroke:#333

12.5 Virtual Server Load Balancing

Virtual Server Load balancing allows you to distribute incoming connection requests to a virtual server between multiple real (physical) servers. This helps reduce each server's workload and to decrease virtual server response times.

12.5.1 Load Balancing Example 1

You are hosting a very popular website on your network, which attracts a lot of traffic and causes problems with your HTTP web server. To resolve this, you set up three identical web servers on the DMZ behind the Zyxel Device (Figure 248 on page 366). The Zyxel Device device then distributes incoming HTTP requests between the three servers. External users only see one virtual web server with IP address 1.1.1.2.

Figure 248 Virtual Server on the WAN- Example 1
ZYXEL USGFLEX700-GB0101F - Load Balancing Example 1 - 1

flowchart
graph LR
    A["192.168.3.7"] --> D["DMZ"]
    B["192.168.3.8"] --> D["DMZ"]
    C["192.168.3.9"] --> D["DMZ"]
    D["DMZ"] --> E["WAN"]
    E["1.1.1.2"] --> F["Global"]

12.5.2 Load Balancing Example 2

You have two internal networks, LAN 1 and LAN 2, that are restricted from accessing each other (Figure 249 on page 367). The LAN 2 network hosts two duplicate SMTP mail servers. You want clients on LAN 1 to be able to access the SMTP servers on LAN 2.

You create a virtual server load balancing rule using IP address 10.0.1.100 and port 25, and add two SMTP servers from LAN 2 to the rule. Now clients on LAN 1 can access the virtual server's SMTP service by connecting to 10.0.1.100 port 25. Clients see a single mail server.

Figure 249 Virtual Server on the LAN - Example 2
ZYXEL USGFLEX700-GB0101F - Load Balancing Example 2 - 1

flowchart
graph TD
    A["Server 1"] --> B["LAN 1"]
    C["Server 2"] --> D["LAN 2"]
    E["Server 1"] --> F["ZYCEL"]
    G["Server 2"] --> H["192.168.1.10"]
    I["Server 1"] --> J["192.168.1.11"]
    K["Server 2"] --> L["10.0.1.100"]

12.5.3 Virtual Server Load Balancing Process

The following is an overview of how the Virtual Server Load Balancing process works.

Figure 250 Load Balancing Process
ZYXEL USGFLEX700-GB0101F - Virtual Server Load Balancing Process - 1

flowchart
graph LR
    Server1["Server 1"] -->|3| Network
    Server2["Server 2"] -->|4| Network
    Server3["Server 3"] -->|5| System
    Network -->|2| ZYKEL["ZYKEL"]
    ZYKEL -->|1.1.1.2| System

1 A client initiates a connection to the virtual server on a specific port.

2 The Zyxel Device matches the request to a set of servers (1, 2, and 3 in Figure 250 on page 368), and then determines which server will handle the request using a user-specified load balancing algorithm.

3 The Zyxel Device forwards the request to the chosen server using NAT.

4 The server processes the request, and then replies to the Zyxel Device.

5 The Zyxel Device forwards the reply to the client using SNAT.

12.5.4 Load Balancing Rules

In order to use load balancing, you must create a load balancing rule. Each load balancing rule consists of an incoming interface, an external IP address, a service type, a load balancing algorithm, and a list of real servers.

Note: One real server can belong to multiple load-balancing rules.

Note: You can only add one interface, IP address, and port to each load balancing rule.

Note: Virtual servers and real servers only support IPv4 addresses.

Only certain Zyxel Device models support virtual server load balancing. There are also limits on the maximum number of rules and real servers per Zyxel Device.

Table 148 Virtual Service Load Balancing Limits

PARAMETER MODEL LIMIT
Maximum Number of Load Balancing Rules per Zyxel DeviceVPN50, USG FLEX 100, USG FLEX 100W, ATP100, ATP100W5
VPN100, USG FLEX 200, ATP200 10
VPN300, USG FLEX 500, ATP500, USG FLEX 700, ATP700, ATP800, VPN100020
Maximum Number of Real Servers Per Load Balancing RuleAll of the above models 4

12.5.5 Virtual Server Load Balancing Algorithms

A rule's load balancing algorithm determines which real server is assigned to an incoming connection request. When creating a load balancing rule, you can assign each server a weight, which indicates the server's processing capacity compared to other servers.

Table 149 Virtual Server Load Balancing Algorithms

ALGORITHM DESCRIPTION
Round-RobinThe Zyxel Device assigns servers in the reverse order they were added to the rule (Last In First Out). All servers are considered equal, regardless of their weight and current number of connections.For example, if you have three servers, A, B, C and nine requests, the servers are assigned in the following order: CBACBACBA.
Weighted Round-RobinThe Zyxel Device assigns servers based on a user-specified weight. Servers with a higher weight are assigned before servers with a lower weight. Each time a server is assigned a request, the server's weight decreases by one point until it finishes processing the request.The Zyxel Device assigns servers with equal weight in the reverse order they were added to the rule (Last In First Out). Servers with zero connections are given priority over all other servers.For example, if you have three servers A, B, C with weights 4, 3, 2 and nine requests, the servers are assigned in the following order: CBAABACBA.C (Weights: A4, B3, C2)CB (Weights: A4, B3, C1)CBA (Weights: A3, B2, C1)CBAA (Weights: A2, B2, C1)CBAAB (Weights: A2, B1, C1)CBAABA (Weights: A1, B1, C1)CBAABAC (Weights: A1, B1, C0)CBAABACB (Weights: A1, B0, C0)CBAABACBA (Weights: A0, B0, C0)

Table 149 Virtual Server Load Balancing Algorithms

ALGORITHM DESCRIPTION
Least-ConnectionThe Zyxel Device assigns the server with the least number of current connections.
Source Hashing The Zyxel Devi ce assigns a server by checking a static hash table, which permanently maps each client IP address to a specific real server.Servers are mapped to new client IP addresses in the reverse order the servers were added to the rule (Last In First Out). Each server is added N times during each sequence, where N is equal to the server's weight.For example, if you have two servers A, and B, with weights 1 and 2, the servers are mapped to new client IP addresses in the hash table in the following order:Source_IP_Hash1 = Server BSource_IP_Hash2 = Server BSource_IP_Hash3 = Server ASource_IP_Hash4 = Server BSource_IP_Hash5 = Server BSource_IP_Hash6 = Server A

12.6 The Virtual Server Load Balancer Screen

Use this screen to view the summary of your virtual server load balancer rules. Click Configuration> Network> NAT> Virtual Server Load Balancer to open the following screen.

Figure 251 Configuration > Network > NAT > Virtual Server Load Balancing
NAT Virtual Server Load Balancer Configuration Add Edit Remove Activate Inactivate Status Health Name External IP Proto... External Port Load Balancin... Virtual Server(s) Page 0 of 0 Show 50 items No data to display Apply Reset

The following table describes the labels in this screen.

Table 150 Configuration > Network > NAT> Virtual Server Load Balancer

LABEL DESCRIPTION
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
# This field is a sequential value, and it is not associated with a specific entry.
Status This icon is lit when the entry is active and dimmed when the entry is inactive.
Health StatusThis field displays whether the real server is reachable for a particular service.
Name This field displays the name of the entry.
External IPThis field displays the external destination IP address (or address object) of traffic that matches this entry.
Protocol This field displays the protocol used by the packets for this entry.
External PortThis field displays the external destination port(s) of packets for the entry.
Load Balancing AlgorithmThis field displays the load balancing algorithm for the entry. See Section 12.5.5 on page 369 for more information on load balancing algorithm.
Virtual Server(s)This displays the number of real servers. Use MouseOver to see each real server IP.
Apply Click this buttonto save your changes to the Zyxel Device.
Reset Click this buttonto return the screen to its last-saved settings.

12.6.1 Adding/Editing a Virtual Server Load Balancing Rule

Use this screen to configure settings for you virtual server load balancer rules. This screen's option change based on the Healthy Check Method selected. Only the PING method screen is displayed here.

Click Configuration> Network> NAT> Virtual Server Load Balancer> Add/ Edit to open the following screen.

Figure 252 Configuration > Network > NAT > Virtual Server Load Balancing > Add/Edit
Add Virtual Server Load Balancer Create New Object▼ General Settings Enable Rule Rule Name: Virtual Server Rule Incoming Interface: wan1 External IP: IP6tc4-Relay Port Mapping Type: Service External Service: AIM TCP, 5190 Healthy Check Method PING Advance Load Balancing Algorithm: Round-Robin Persistence Timeout: 360 (1-86400) Real Server Add Edit Remove Server IP Port Weight 1 1.1.1.1 5190 Page 0 of 0 Show 50 items No data to display OK Cancel

The following table describes the labels in this screen.

Table 151 Configuration > Network > NAT > Virtual Server Load Balancer> Add/Edit

LABEL DESCRIPTION
General Settings
Create new ObjectUse to configure any new settings objects that you need to use in this screen.
Enable Rule Use this option to turn the virtual server load balancer rule on or off.
Rule NameType in the name of the virtual server load balancer rule. The name is used to refer to the virtual server load balancer rule. You may use 1-31 alphanumeric characters, underscores( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive.
Virtual Server Rule
Incoming InterfaceSelect the interface on which packets from the client to the virtual server load balancer rule must be received. It can be an Ethernet, VLAN, bridge, or PPPoE/PPTP interface.
External IPThis is the IP address of the virtual server. It may be different to the incoming interface IP address. Select a Host, Interface IP or interface Gateway object already configured in Object> Address/ Geo IP> Address> IPv4 Address. or enter a User Defined IPv4 address for the virtual server.
User Defined External IPThis field is available if External IP is User Defined. Type the IPv4 address of the virtual server.
Port Mapping TypeUse the drop-down list box to select how many external destination ports this virtual server load balancer rule supports for the selected destination IP address (External IP). Choices are:Service - this virtual server load balancer rule supports a service such as FTP (see Object > Service > Service). For this type, you need to fill in External Service.External Service: Select a service from the drop down list box.Port - this virtual server load balancer rule supports one destination port. For this type, you need to fill in these fields.Protocol Type: TCP or UDPExternal Port: specify a port number for this ruleThe type of service or port selected automatically updates Healthy Check Method as follows:HTTP Request: 80, 8080HTTPS Request: 443SMTP Helo: 25DNS Query: 53(TCP/UDP)Default TCP if protocol is TCP, PING if protocol is UDPYou can still change the Healthy Check Method in the next field.
Healthy Check MethodSelect this to periodically check if the real server is still online. The Zyxel Device periodically sends a request to each real server. This request ensures that the server is available, and optionally ensures that a specific service on the server is running.Use the drop-down list box to set the type of status request to send to each real server.For example, select HTTP and the Zyxel Device periodically sends an HTTP request to each real server, ensuring that the server is available and that its HTTP service is running.HTTP: Web serviceHTTPS: Secure web serviceTCP: A general network protocol that shows the server is accepting TCP connectionsSMTP: Mail serviceDNS: Dynamic Name ServicePING: A general network protocol that shows the server is reachable
PINGCheck Period- Sets the health check time interval, in seconds. The default is 60.Connect Timeout- Sets the period of time in seconds that the Zyxel Device waits after sending a health check request before marking the health check as failed. The default is 5.Retry- Sets the number of times the Zyxel Device resends a health check request before marking the server as unavailable. The default is 1.
HTTP RequestPath- Sets the URL to request when the health check type is set to HTTP or HTTPS.Note: If an MD5 checksum is set for a real server, the Zyxel Device uses this checksum to verify that each HTTP health check request returns the correct webpage, and not an error page.Host- Sets the SNI to send to the real server when the health check type is set to HTTPS. A client sends a Server Name Indication (SNI) when they start an HTTPS session with the server. It allows multiple HTTPS sessions to the same IP address and port number with different certificates with different SNIs.Enable Hash Check- Enables or disables auto-hashing. When enabled, the Zyxel Device sends a HTTP request to each real server, and then calculates and stores the MD5 checksum of the returned webpage. The Zyxel Device uses this checksum to verify that each HTTP health check request returns the correct webpage, and not an error page.Status Code- Sets which status code indicates a successful reply when the health check type is set to HTTP or HTTPS. The default value is range 200-299.Check Period- Sets the health check time interval, in seconds. The default is 60.Connect Timeout- Sets the period of time in seconds that the Zyxel Device waits after sending a health check request before marking the health check as failed. The default is 5.Retry- Sets the number of times the Zyxel Device resends a health check request before marking the server as unavailable. The default is 1.
HTTPS RequestPath- Sets the URL to request when the health check type is set to HTTP or HTTPS.Note: If an MD5 checksum is set for a real server, the Zyxel Device uses this checksum to verify that each HTTPS health check request returns the correct webpage, and not an error page.Host- Sets the SNI to send to the real server when the health check type is set to HTTPS. A client sends a Server Name Indication (SNI) when they start an HTTPS session with the server. It allows multiple HTTPS sessions to the same IP address and port number with different certificates with different SNIs.Enable Hash Check- Enables or disables auto-hashing. When enabled, the Zyxel Device sends a HTTP query to each real server, and then calculates and stores the MD5 checksum of the returned webpage. The Zyxel Device uses this checksum to verify that each HTTP health check request returns the correct webpage, and not an error page.Status Code- Sets which status code indicates a successful reply when the health check type is set to HTTP or HTTPS. The default value is range 200-299.Enable SNI- Enables or disables sending a Server_Name Indication (SNI) as part of the health check request when health check type is set to HTTPS.Check Period- Sets the health check time interval, in seconds. The default is 60.Connect Timeout- Sets the period of time in seconds that the Zyxel Device waits after sending a health check request before marking the health check as failed. The default is 5.Retry- Sets the number of times the Zyxel Device resends a health check request before marking the server as unavailable. The default is 1.
SMTP HeloHelo Name- Sets the HELO string to send to the real server, when the health check type is set to SMTP. Typically, the HELO string should contain the fully qualified domain name (FQDN) of the mail server.Check Period- Sets the health check time interval, in seconds. The default is 60.Connect Timeout- Sets the period of time in seconds that the Zyxel Device waits after sending a health check request before marking the health check as failed. The default is 5.Retry- Sets the number of times the Zyxel Device resends a health check request before marking the server as unavailable. The default is 1.
DNS QueryQuery- Sets the fully qualified domain name (FQDN) to send to the real server when health check type is set to DNS.Check Period- Sets the health check time interval, in seconds. The default is 60.Connect Timeout- Sets the period of time in seconds that the Zyxel Device waits after sending a health check request before marking the health check as failed. The default is 5.Retry- Sets the number of times the Zyxel Device resends a health check request before marking the server as unavailable. The default is 1.
TCP ConnectionCheck Period- Sets the health check time interval, in seconds. The default is 60.Connect Timeout- Sets the period of time in seconds that the Zyxel Device waits after sending a health check request before marking the health check as failed. The default is 5.Retry- Sets the number of times the Zyxel Device resends a health check request before marking the server as unavailable. The default is 1.
Load Balancing AlgorithmSets the load balancing algorithm for this rule. For information about each algorithm, see Section 12.5.5 on page 369.
Persistence TimeoutSets how long a client/server session with no activity stays open. Timeout is measured in seconds, and the default value is 360.Multiple requests from a client within a short time period are directed to the same real server, as part of a persistent client/server session.If there are no incoming requests from a client within the specified timeout period, then the persistent client/server session is closed. Further requests from the client might be assigned to a different real server, determined by the load balancing algorithm.
Real Server
Add Click this to createa new entry.
EditDouble-click an entry or select it and click Edit to modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
#This field is a sequential value, and it is not associated with a specific entry.
Server IP This field displays the IPv4 address of a server on the LAN.
PortThis field displays the External Port or the port based on the External Service selected above. You may change the port here.
WeightThe weight represents the processing power of this server compared to other servers. A server with a weight of 2 is considered to be able to handle two times more requests than a server with a weight of 1. See Section 12.5.5 on page 369 for more information on weight in each load balancing algorithm.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to return to the Virtual Server Load Balancer summary screen without creating the virtual server load balancer rule (if it is new) or saving any changes (if it already exists).

CHAPTER 13

Redirect Service

13.1 Overview

Redirect Service redirects HTTP and SMTP traffic.

13.1.1 HTTP Redirect

HTTP redirect forwards the client's HTTP request (except HTTP traffic destined for the Zyxel Device) to a web proxy server. In the following example, proxy server A is connected to the DMZ interface. When a client connected to the LAN1 zone wants to open a web page, its HTTP request is redirected to proxy server A first. If proxy server A cannot find the web page in its cache, a policy route allows it to access the Internet to get them from a server. Proxy server A then forwards the response to the client.

Figure 253 HTTP Redirect Example
ZYXEL USGFLEX700-GB0101F - HTTP Redirect - 1

flowchart
graph TD
    A["LAN 1"] --> B["Computer"]
    C["Computer"] --> B
    B --> D["Network"]
    D --> E["WAN"]
    D --> F["Internet"]
    D --> G["DMZ"]
    G --> H["A"]
    style A fill:#f9f,stroke:#333
    style C fill:#f9f,stroke:#333
    style D fill:#ccf,stroke:#333
    style E fill:#cfc,stroke:#333
    style F fill:#fcc,stroke:#333
    style G fill:#cff,stroke:#333
    style H fill:#ffc,stroke:#333

13.1.2 SMTP Redirect

SMTP redirect forwards the authenticated client's SMTP message to a SMTP server, that handles all outgoing email messages. In the following example, SMTP server A is connected to the lan2 interface in the LAN2 zone. When a client connected to the lan1 interface in the LAN1 zone logs into the Zyxel Device and wants to send an email, its SMTP message is redirected to SMTP server A. SMTP server A then sends it to a mail server, where the message will be delivered to the recipient.

The Zyxel Device forwards SMTP traffic using TCP port 25.

Figure 254 SMTP Redirect Example
ZYXEL USGFLEX700-GB0101F - SMTP Redirect - 1

flowchart
graph TD
    subgraph_LAN_1["LAN 1"]
        A["Computer"] --> B["Switch"]
    end
    subgraph_LAN_2["LAN 2"]
        C["Computer"] --> D["Switch"]
    end
    B --> E["Router"]
    D --> E
    E --> F["Internet"]
    F --> G["WAN"]
    G --> H["Server"]
    style LAN_1 fill:#f9f,stroke:#333
    style LAN_2 fill:#bbf,stroke:#333
    style WAN fill:#dfd,stroke:#333
    style Internet fill:#dfd,stroke:#333

13.1.3 What You Can Do in this Chapter

Use the Redirect Service screens (see Section 13.2 on page 378) to display and edit the HTTP and SMTP redirect rules.

13.1.4 What You Need to Know

Web Proxy Server

A proxy server helps client devices make indirect requests to access the Internet or outside network resources/services. A proxy server can act as a security policy or an ALG (application layer gateway) between the private network and the Internet or other networks. It also keeps hackers from knowing internal IP addresses.

A client connects to a web proxy server each time he/she wants to access the Internet. The web proxy provides caching service to allow quick access and reduce network usage. The proxy checks its local cache for the requested web resource first. If it is not found, the proxy gets it from the specified server and forwards the response to the client.

HTTP Redirect, Security Policy and Policy Route

With HTTP redirect, the relevant packet flow for HTTP traffic is:

1 Security Policy
2 Application Patrol
3 HTTP Redirect
4 Policy Route

Even if you set a policy route to the same incoming interface and service as a HTTP redirect rule, the Zyxel Device checks the HTTP redirect rules first and forwards HTTP traffic to a proxy server if matched. You need to make sure there is no security policy blocking the HTTP requests from the client to the proxy server.

You also need to manually configure a policy route to forward the HTTP traffic from the proxy server to the Internet. To make the example in Figure 253 on page 375 work, make sure you have the following settings.

For HTTP traffic between lan1 and dmz:

  • a from LAN1 to DMZ security policy (default) to allow HTTP requests from lan1 to dmz. Responses to this request are allowed automatically.
  • a application patrol rule to allow HTTP traffic between lan1 and dmz.
  • a HTTP redirect rule to forward HTTP traffic from lan1 to proxy server A.

For HTTP traffic between dmz and wan1:

  • a from DMZ to WAN security policy (default) to allow HTTP requests from dmz to wan1. Responses to these requests are allowed automatically.
  • a application patrol rule to allow HTTP traffic between dmz and wan1.
  • a policy route to forward HTTP traffic from proxy server A to the Internet.

SMTP

Simple Mail Transfer Protocol (SMTP) is the Internet's message transport standard. It controls the sending of email messages between servers. Email clients (also called email applications) then use mail server protocols such as POP (Post Office Protocol) or IMAP (Internet Message Access Protocol) to retrieve email. Email clients also generally use SMTP to send messages to a mail server. The older POP2 requires SMTP for sending messages while the newer POP3 can be used with or without it. This is why many email applications require you to specify both the SMTP server and the POP or IMAP server (even though they may actually be the same server).

SMTP Redirect, Firewall and Policy Route

With SMTP redirect, the relevant packet flow for SMTP traffic is:

1 Firewall

2 SMTP Redirect

3 Policy Route

Even if you set a policy route to the same incoming interface and service as a SMTP redirect rule, the Zyxel Device checks the SMTP redirect rules first and forwards SMTP traffic to a SMTP server if matched. You need to make sure there is no firewall rule(s) blocking the SMTP traffic from the client to the SMTP server.

You also need to manually configure a policy route to forward the SMTP traffic from the SMTP server to the Internet. To make the example in Figure 254 on page 376 work, make sure you have the following settings.

For SMTP traffic between lan1 and lan2:

  • a from LAN1 to LAN2 firewall rule to allow SMTP messages from lan1 to lan2. Responses to this request are allowed automatically.
  • a SMTP redirect rule to forward SMTP traffic from lan1 to SMTP server A.

For SMTP traffic between lan2 and wan1:

  • a from LAN2 to WAN firewall rule (default) to allow SMTP messages from lan2 to wan1. Responses to these requests are allowed automatically.
  • a policy route to forward SMTP messages from SMTP server A to the Internet.

13.2 The Redirect Service Screen

To configure redirection of a HTTP or SMTP request, click Configuration > Network > HTTP Redirect. This screen displays the summary of the redirect rules.

Note: You can configure up to one HTTP redirect rule and one SMTP redirect rule for each (incoming) interface.

Figure 255 Configuration > Network > Redirect Service
Redirect Service Redirect Settings Add Edit Remove Activate Inactivate Move St... S... Name User/Gro... Interface Source Address Server Port Page 0 of 0 Show 50 Items No data to display Apply Reset

The following table describes the labels in this screen.

Table 152 Configuration > Network > Redirect Service

LABEL DESCRIPTION
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
MoveTo change a rule's position in the numbered list, select the rule and click Move to display a field to type a number for where you want to put that rule and press [ENTER] to move the rule to the number that you typed.The ordering of your rules is important as they are applied in order of their numbering.
#This field is a sequential value, and it is not associated with a specific entry.
StatusThis icon is lit when the entry is active and dimmed when the entry is inactive.
Service This is the name of the service: HTTP or SMTP.
Name This is the descriptive name of a rule.
User/Group This is the user account or user group name to which this rule is applied.
Interface This is the interface on which the request must be received.
Source AddressThis is the name of the source IP address object from which the traffic should be sent. If any displays, the rule is effective for every source.
ServerThis is the IP address of the HTTP proxy server or the SMTP server to which the matched traffic is forwarded.
PortThis is the service port number used by the HTTP proxy server or SMTP server.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

13.2.1 The Redirect Service Edit Screen

Click Network > Redirect Service to open the Redirect Service screen. Then click the Add or Edit icon to open the Redirect Service Edit screen where you can configure the rule.

Figure 256 Network > Redirect Service > Edit
Add Redirect Service Create new Object Configuration Enable Service: HTTP Redirect Name: Criteria User: any Interface: any Source Address: any Redirect Settings Server: Port: (1-65535) OK Cancel

The following table describes the labels in this screen.

Table 153 Network > Redirect Service > Edit

LABEL DESCRIPTION
Enable Use this option to turn the Redirect Service rule on or off.
ServiceSelect the service to be redirected: HTTP Redirect or SMTP redirect.
Name Enter a name to identify this rule. You may use 1-31 alphanumeric characters, underscores( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive.
Criteria
UserSelect the user account or user group name to which this rule is applied.
InterfaceSelect the interface on which the request must be received for the Zyxel Device to forward it to the specified server.
Source AddressSelect the name of the source IP address object from which the traffic should be sent. Select any for the rule to be effective for every source.
Redirect Settings
Server Enter the IP address of the HTTP proxy or SMTP server.
Port Enter the port number that the HTTP proxy or SMTP server uses.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

CHAPTER 14 ALG

14.1 ALG Overview

Application Layer Gateway (ALG) allows the following applications to operate properly through the Zyxel Device's NAT.

  • SIP - Session Initiation Protocol (SIP) - An application-layer protocol that can be used to create voice and multimedia sessions over Internet.
    • H.323 - A teleconferencing protocol suite that provides audio, data and video conferencing.
  • FTP - File Transfer Protocol - an Internet file transfer service.

The following example shows SIP signaling (1) and audio (2) sessions between SIP clients A and B and the SIP server.

Figure 257 SIP ALG Example
ZYXEL USGFLEX700-GB0101F - ALG Overview - 1

flowchart
graph TD
    A["A"] --> B["......"]
    B --> C["Internet"]
    C --> D["2"]
    D --> E["B"]
    style C fill:#cce5ff,stroke:#333
    style E fill:#cce5ff,stroke:#333

The ALG feature is only needed for traffic that goes through the Zyxel Device's NAT.

14.1.1 What You Need to Know

Application Layer Gateway (ALG), NAT and Security Policy

The Zyxel Device can function as an Application Layer Gateway (ALG) to allow certain NAT un-friendly applications (such as SIP) to operate properly through the Zyxel Device's NAT and security policy. The Zyxel Device dynamically creates an implicit NAT session and security policy session for the application's traffic from the WAN to the LAN. The ALG on the Zyxel Device supports all of the Zyxel Device's NAT mapping types.

FTP ALG

The FTP ALG allows TCP packets with a specified port destination to pass through. If the FTP server is located on the LAN, you must also configure NAT (port forwarding) and security policies if you want to allow access to the server from the WAN. Bandwidth management can be applied to FTP ALG traffic.

H.323 ALG

• The H.323 ALG supports peer-to-peer H.323 calls.
- The H.323 ALG handles H.323 calls that go through NAT or that the Zyxel Device routes. You can also make other H.323 calls that do not go through NAT or routing. Examples would be calls between LAN IP addresses that are on the same subnet.
- The H.323 ALG allows calls to go out through NAT. For example, you could make a call from a private IP address on the LAN to a peer device on the WAN.
- The H.323 ALG operates on TCP packets with a specified port destination.
- Bandwidth management can be applied to H.323 ALG traffic.
• The Zyxel Device allows H.323 audio connections.
- The Zyxel Device can also apply bandwidth management to traffic that goes through the H.323 ALG.

The following example shows H.323 signaling (1) and audio (2) sessions between H.323 devices A and B.

Figure 258 H.323 ALG Example
ZYXEL USGFLEX700-GB0101F - H.323 ALG - 1

flowchart
graph LR
    A["A"] --> B["......"]
    B --> C["Internet"]
    C --> D["2"]
    D --> E["B"]
    style C fill:#cce5ff,stroke:#333
    style D fill:#cce5ff,stroke:#333

SIP ALG

  • SIP phones can be in any zone (including LAN, DMZ, WAN), and the SIP server and SIP clients can be in the same network or different networks. The SIP server cannot be on the LAN. It must be on the WAN or the DMZ.
  • There should be only one SIP server (total) on the Zyxel Device's private networks. Any other SIP servers must be on the WAN. So for example you could have a Back-to-Back User Agent such as the IPPBX x6004 or an asterisk PBX on the DMZ or on the LAN but not on both.
  • Using the SIP ALG allows you to use bandwidth management on SIP traffic. Bandwidth management can be applied to FTP ALG traffic. Use the option in the Configuration > BWM screen to configure the highest bandwidth available for SIP traffic.
  • The SIP ALG handles SIP calls that go through NAT or that the Zyxel Device routes. You can also make other SIP calls that do not go through NAT or routing. Examples would be calls between LAN IP addresses that are on the same subnet.
  • The SIP ALG supports peer-to-peer SIP calls. The security policy (by default) allows peer to peer calls from the LAN zone to go to the WAN zone and blocks peer to peer calls from the WAN zone to the LAN zone.
  • The SIP ALG allows UDP packets with a specified port destination to pass through.
    • The Zyxel Device allows SIP audio connections.

  • You do not need to use TURN (Traversal Using Relay NAT) for VoIP devices behind the Zyxel Device when you enable the SIP ALG.

  • Configuring the SIP ALG to use custom port numbers for SIP traffic also configures the application patrol (see Chapter 31 on page 586) to use the same port numbers for SIP traffic. Likewise, configuring the application patrol to use custom port numbers for SIP traffic also configures SIP ALG to use the same port numbers for SIP traffic.

Peer-to-Peer Calls and the Zyxel Device

The Zyxel Device ALG can allow peer-to-peer VoIP calls for both H.323 and SIP. You must configure the security policy and NAT (port forwarding) to allow incoming (peer-to-peer) calls from the WAN to a private IP address on the LAN (or DMZ).

VoIP Calls from the WAN with Multiple Outgoing Calls

When you configure the security policy and NAT (port forwarding) to allow calls from the WAN to a specific IP address on the LAN, you can also use policy routing to have H.323 (or SIP) calls from other LAN or DMZ IP addresses go out through a different WAN IP address. The policy routing lets the Zyxel Device correctly forward the return traffic for the calls initiated from the LAN IP addresses.

For example, you configure the security policy and NAT to allow LAN IP address A to receive calls from the Internet through WAN IP address 1. You also use a policy route to have LAN IP address A make calls out through WAN IP address 1. Configure another policy route to have H.323 (or SIP) calls from LAN IP addresses B and C go out through WAN IP address 2. Even though only LAN IP address A can receive incoming calls from the Internet, LAN IP addresses B and C can still make calls out to the Internet.

Figure 259 VoIP Calls from the WAN with Multiple Outgoing Calls
ZYXEL USGFLEX700-GB0101F - VoIP Calls from the WAN with Multiple Outgoing Calls - 1

flowchart
graph LR
    A["Device A"] --> D["Processing Block"]
    B["Device B"] --> D
    C["Device C"] --> D
    D --> E["Internet"]
    style D fill:#f9f,stroke:#333
    style E fill:#bbf,stroke:#333

VoIP with Multiple WAN IP Addresses

With multiple WAN IP addresses on the Zyxel Device, you can configure different security policy and NAT (port forwarding) rules to allow incoming calls from each WAN IP address to go to a specific IP address on the LAN (or DMZ). Use policy routing to have the H.323 (or SIP) calls from each of those LAN or DMZ IP addresses go out through the same WAN IP address that calls come in on. The policy routing lets the Zyxel Device correctly forward the return traffic for the calls initiated from the LAN IP addresses.

For example, you configure security policy and NAT rules to allow LAN IP address A to receive calls through public WAN IP address 1. You configure different security policy and port forwarding rules to allow LAN IP address B to receive calls through public WAN IP address 2. You configure corresponding

policy routes to have calls from LAN IP address A go out through WAN IP address 1 and calls from LAN IP address B go out through WAN IP address 2.

Figure 260 VoIP with Multiple WAN IP Addresses
ZYXEL USGFLEX700-GB0101F - VoIP with Multiple WAN IP Addresses - 1

flowchart
graph LR
    A["Device A"] -->|Data Flow| B["Device B"]
    B -->|Data Flow| C["Internet"]
    style A fill:#cce5ff,stroke:#333
    style B fill:#cce5ff,stroke:#333
    style C fill:#cce5ff,stroke:#333

14.1.2 Before You Begin

You must also configure the security policy and enable NAT in the Zyxel Device to allow sessions initiated from the WAN.

14.2 The ALG Screen

Click Configuration > Network > ALG to open the ALG screen. Use this screen to turn ALGs off or on, configure the port numbers to which they apply, and configure SIP ALG time outs.

Note: If the Zyxel Device provides an ALG for a service, you must enable the ALG in order to use the application patrol on that service's traffic.

Figure 261 Configuration > Network > ALG
ALG SIP Settings Enable SIP ALG Enable SIP Transformations Enable Configure SIP Inactivity Timeout SIP Media Inactivity Timeout : 120 (seconds) SIP Signaling Inactivity Timeout : 1800 (seconds) Restrict Peer to Peer Signaling Connection Restrict Peer to Peer Media Connection SIP Signaling Port : Add Edit Remove Port 1 5060 H.323 Settings Enable H.323 ALG Enable H.323 Transformations H.323 Signaling Port : 1720 (1025-65535) Additional H.323 Signaling Port for Transformations : (1025-65535) (Optional) FTP Settings Enable FTP ALG Enable FTP Transformations FTP Signaling Port : 21 (1-65535) Additional FTP Signaling Port for Transformations : (1-65535) (Optional) Apply Reset

The following table describes the labels in this screen.

Table 154 Configuration > Network > ALG

LABEL DESCRIPTION
Enable SIP ALGTurn on the SIP ALG to detect SIP traffic and help build SIP sessions through the Zyxel Device's NAT. Enabling the SIP ALG also allows you to use the application patrol to detect SIP traffic and manage the SIP traffic's bandwidth (see Chapter 31 on page 586).
Enable SIP TransformationsSelect this to have the Zyxel Device modify IP addresses and port numbers embedded in the SIP data payload.You do not need to use this if you have a SIP device or server that will modify IP addresses and port numbers embedded in the SIP data payload.
Enable Configure SIP Inactivity TimeoutSelect this option to have the Zyxel Device apply SIP media and signaling inactivity time out limits. These timeouts will take priority over the SIP session time out “Expires” value in a SIP registration response packet.
SIP Media Inactivity TimeoutUse this field to set how many seconds (1~86400) the Zyxel Device will allow a SIP session to remain idle (without voice traffic) before dropping it.If no voice packets go through the SIP ALG before the timeout period expires, the Zyxel Device deletes the audio session. You cannot hear anything and you will need to make a new call to continue your conversation.
SIP Signaling Inactivity TimeoutMost SIP clients have an “expire” mechanism indicating the lifetime of signaling sessions. The SIP user agent sends registration packets to the SIP server periodically and keeps the session alive in the Zyxel Device.If the SIP client does not have this mechanism and makes no calls during the Zyxel Device SIP timeout, the Zyxel Device deletes the signaling session after the timeout period. Enter the SIP signaling session timeout value (1~86400).
Restrict Peer to Peer Signaling ConnectionA signaling connection is used to set up the SIP connection.Enable this if you want signaling connections to only arrive from the IP address(es) you registered with. Signaling connections from other IP addresses will be dropped.
Restrict Peer to Peer Media ConnectionA media connection is the audio transfer in a SIP connection.Enable this if you want media connections to only arrive from the IP address(es) you registered with. Media connections from other IP addresses will be dropped.You should disable this if have registered for cloud VoIP services.
SIP Signaling PortIf you are using a custom UDP port number (not 5060) for SIP traffic, enter it here. Use the Add icon to add fields if you are also using SIP on additional UDP port numbers.
Enable H.323 ALGTurn on the H.323 ALG to detect H.323 traffic (used for audio communications) and help build H.323 sessions through the Zyxel Device’s NAT. Enabling the H.323 ALG also allows you to use the application patrol to detect H.323 traffic and manage the H.323 traffic's bandwidth (see Chapter 31 on page 586).
Enable H.323 TransformationsSelect this to have the Zyxel Device modify IP addresses and port numbers embedded in the H.323 data payload.You do not need to use this if you have a H.323 device or server that will modify IP addresses and port numbers embedded in the H.323 data payload.
H.323 Signaling PortIf you are using a custom TCP port number (not 1720) for H.323 traffic, enter it here.
Additional H.323 Signaling Port for TransformationsIf you are also using H.323 on an additional TCP port number, enter it here.
Enable FTP ALGTurn on the FTP ALG to detect FTP (File Transfer Program) traffic and help build FTP sessions through the Zyxel Device’s NAT. Enabling the FTP ALG also allows you to use the application patrol to detect FTP traffic and manage the FTP traffic's bandwidth (see Chapter 31 on page 586).
Enable FTP TransformationsSelect this option to have the Zyxel Device modify IP addresses and port numbers embedded in the FTP data payload to match the Zyxel Device's NAT environment.Clear this option if you have an FTP device or server that will modify IP addresses and port numbers embedded in the FTP data payload to match the Zyxel Device’s NAT environment.
FTP Signaling PortIf you are using a custom TCP port number (not 21) for FTP traffic, enter it here.
Additional FTP Signaling Port for TransformationsIf you are also using FTP on an additional TCP port number, enter it here.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

14.3 ALG Technical Reference

Here is more detailed information about the Application Layer Gateway.

ALG

Some applications cannot operate through NAT (are NAT unfriendly) because they embed IP addresses and port numbers in their packets' data payload. The Zyxel Device examines and uses IP address and port number information embedded in the VoIP traffic's data stream. When a device behind the Zyxel Device uses an application for which the Zyxel Device has VoIP pass through enabled, the Zyxel Device translates the device's private IP address inside the data stream to a public IP address. It also records session port numbers and allows the related sessions to go through the security policy so the application's traffic can come in from the WAN to the LAN.

ALG and Trunks

If you send your ALG-managed traffic through an interface trunk and all of the interfaces are set to active, you can configure routing policies to specify which interface the ALG-managed traffic uses.

You could also have a trunk with one interface set to active and a second interface set to passive. The Zyxel Device does not automatically change ALG-managed connections to the second (passive) interface when the active interface's connection goes down. When the active interface's connection fails, the client needs to re-initialize the connection through the second interface (that was set to passive) in order to have the connection go through the second interface. VoIP clients usually re-register automatically at set intervals or the users can manually force them to re-register.

FTP

File Transfer Protocol (FTP) is an Internet file transfer service that operates on the Internet and over TCP/IP networks. A system running the FTP server accepts commands from a system running an FTP client. The service allows users to send commands to the server for uploading and downloading files.

H.323

H.323 is a standard teleconferencing protocol suite that provides audio, data and video conferencing. It allows for real-time point-to-point and multipoint communication between client computers over a packet-based network that does not provide a guaranteed quality of service. NetMeeting uses H.323.

SIP

The Session Initiation Protocol (SIP) is an application-layer control (signaling) protocol that handles the setting up, altering and tearing down of voice and multimedia sessions over the Internet. SIP is used in VoIP (Voice over IP), the sending of voice signals over the Internet Protocol.

SIP signaling is separate from the media for which it handles sessions. The media that is exchanged during the session can use a different path from that of the signaling. SIP handles telephone calls and can interface with traditional circuit-switched telephone networks.

RTP

When you make a VoIP call using H.323 or SIP, the RTP (Real time Transport Protocol) is used to handle voice data transfer. See RFC 1889 for details on RTP.

CHAPTER 15 UPnP

15.1 UPnP and NAT-PMP Overview

The Zyxel Device supports both UPnP and NAT-PMP to permit networking devices to discover each other and connect seamlessly.

Universal Plug and Play (UPnP) is a distributed, open networking standard that uses TCP/IP for simple peer-to-peer network connectivity between devices. A UPnP device can dynamically join a network, obtain an IP address, convey its capabilities and learn about other devices on the network. In turn, a device can leave a network smoothly and automatically when it is no longer in use. A gateway that supports UPnP is called Internet Gateway Device (IGD). The standardized Device Control Protocol (DCP) is defined by the UPnP Forum for IGDs to configure port mapping automatically.

NAT Port Mapping Protocol (NAT-PMP), introduced by Apple and implemented in current Apple products, is used as an alternative NAT traversal solution to the UPnP IGD protocol. NAT-PMP runs over UDP port 5351. NAT-PMP is much simpler than UPnP IGD and mainly designed for small home networks. It allows a client behind a NAT router to retrieve the router's public IP address and port number and make them known to the peer device with which it wants to communicate. The client can automatically configure the NAT router to create a port mapping to allow the peer to contact it.

15.2 What You Need to Know

UPnP hardware is identified as an icon on the network folder (Windows 7). Each UPnP compatible device installed on your network will appear as a separate icon. Selecting the icon of a UPnP device will allow you to access the information and properties of that device.

15.2.1 NAT Traversal

UPnP NAT traversal automates the process of allowing an application to operate through NAT. UPnP network devices can automatically configure network addressing, announce their presence on the network to other UPnP devices and enable exchange of simple product and service descriptions. NAT traversal allows the following:

• Dynamic port mapping
- Learning public IP addresses
- Assigning lease times to mappings

Windows Messenger is an example of an application that supports NAT traversal and UPnP.

See the NAT chapter for more information on NAT.

15.2.2 Cautions with UPnP and NAT-PMP

The automated nature of NAT traversal applications in establishing their own services and opening security policy ports may present network security issues. Network information and configuration may also be obtained and modified by users in some network environments.

When a UPnP or NAT-PMP device joins a network, it announces its presence with a multicast message. For security reasons, the Zyxel Device allows multicast messages on the LAN only.

All UPnP-enabled or NAT-PMP-enabled devices may communicate freely with each other without additional configuration. Disable UPnP or NAT-PMP if this is not your intention.

15.3 UPnP Screen

Use this screen to enable UPnP and NAT-PMP on your Zyxel Device.

Click Configuration > Network > UPnP to display the screen shown next.

Figure 262 Configuration > Network > UPnP
UPnP General Setting Enable UPnP Enable NAT-PMP Allow UPnP or NAT-PMP to pass through Firewall Outgoing WAN Interface: ALL Support LAN List Available dmz lan1 lan2 reserved Member Apply Reset

The following table describes the fields in this screen.

Table 155 Configuration > Network > UPnP

LABEL DESCRIPTION
Enable UPnPSelect this check box to activate UPnP on the Zyxel Device. Be aware that anyone could use a UPnP application to open the web configurator's login screen without entering the Zyxel Device's IP address (although you must still enter the password to access the web configurator).
Enable NAT-PMPNAT Port Mapping Protocol (NAT-PMP) automates port forwarding to allow a computer in a private network (behind the Zyxel Device) to automatically configure the Zyxel Device to allow computers outside the private network to contact it.Select this check box to activate NAT-PMP on the Zyxel Device. Be aware that anyone could use a NAT-PMP application to open the web configurator's login screen without entering the Zyxel Device's IP address (although you must still enter the password to access the web configurator).
Allow UPnP or NAT-PMP to pass through FirewallSelect this check box to allow traffic from UPnP-enabled or NAT-PMP-enabled applications to bypass the security policy.Clear this check box to have the security policy block all UPnP or NAT-PMP application packets (for example, MSN packets).
Outgoing WAN InterfaceSelect through which WAN interface(s) you want to send out traffic from UPnP-enabled or NAT-PMP-enabled applications. If the WAN interface you select loses its connection, the Zyxel Device attempts to use the other WAN interface. If the other WAN interface also does not work, the Zyxel Device drops outgoing packets from UPnP-enabled or NAT-PMP-enabled applications.
Support LAN ListThe Available list displays the name(s) of the internal interface(s) on which the Zyxel Device supports UPnP and/or NAT-PMP.To enable UPnP and/or NAT-PMP on an interface, you can double-click a single entry to move it or use the [Shift] or [Ctrl] key to select multiple entries and click the right arrow button to add to the Member list. To remove an interface, select the name(s) in the Member list and click the left arrow button.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

15.4 Technical Reference

The sections show examples of using UPnP.

15.4.1 Turning on UPnP in Windows 7 Example

This section shows you how to use the UPnP feature in Windows 7. UPnP server is installed in Windows 7. Activate UPnP on the Zyxel Device.

Make sure the computer is connected to a LAN port of the Zyxel Device. Turn on your computer and the Zyxel Device.

1 Click the start icon, Control Panel and then the Network and Sharing Center.

ControlPanel File Edit View Tools Help Adjust your computer's settings View by: Small tools Action Center Edit Active Data Repoships Default Programs Display Fonts SmartOS 虚拟和配置 Keyboard Network and Sharing Center Phone and Student Regener and Language Sync Center User Accounts Windows Update Administrative Tools Local Management Desktop Desktop Door of Access Center Getting Started Install Rapid Storage Technology Location and Other Services Configuration Area Scars Power Options Semology and Desktop Connections System Windows Certificate AutoPlay Credential Manager Device Manager Tech Player (3.2-bit) HomeGroup Internet Options Mark Performance Information and Tools Programs and Features Sound Textiller and Start Menu Windows Defense Backup and Restore Data and Time Design and Printers Futier Options Indexing Options Text (3.2-bit) Mouse Personalization Accuracy Search Recognitions Troubleshooting Windows Firewall

2 Click Change Advanced Sharing Settings.

Control Panel All Control Panel Items Network and Sharing Centers File Edit View Tools Help Control Panel Name Change adapter settings Change advanced sharing settings View your basic network information and set up connections TWPZCT01050-01 (This computer) ZJNEL.com Internet Set full map View your active networks QXEL.com Domain network Access type: No Internet access Connections Local-Axis Connection Change your networking settings: Set up a new connected network Set up a wireless, broadband, dial-up, ad hoc, or VPN connection or set up a router or access point. Connect to a network Connect or secure to a wireless, wired, dial-up, or VPN connection. Choose homegroup and sharing options Access files and printers located on other network computers, on change sharing settings. Transconnect problems Diagnose and repair network problems, or get troubleshooting information.

3 Select Turn on network discovery and click Save Changes. Network discovery allows your computer to find other computers and devices on the network and other computers on the network to find your computer. This makes it easier to share files and printers.

Change sharing options for different network profiles Windows creates a separate network profile for each network you use. You can choose specific options for each profile. Home or Work Public Domain (current profile) Network discovery When network discovery is on, this computer can see other network computers and devices and is visible to other network computers. What is network discovery? ● Turn on network discovery ○ Turn on network discovery File and printer sharing When file and printer sharing is on, files and printers that you have shared from this computer can be accessed by people on the network. ● Turn on file and printer sharing ○ Turn off file and printer sharing Save changes Cancel

15.4.1.1 Auto-discover Your UPnP-enabled Network Device

Before you follow these steps, make sure you already have UPnP activated on the Zyxel Device and in your computer.

Make sure your computer is connected to a LAN port of the Zyxel Device.

1 Open the Windows Explorer and click Network.
2 Right-click the device icon and select Properties.

Figure 263 Network Connections
Network Organize Network and Sharing Center Add a printer Add a wireless device Favorites Desktop Downloads Recent Places Libraries Documents Music Pictures Videos Computer Local Disk (C:) Local Disk (D:) zytn tem cso_ Tedl Network Computer (1) TWPCZT02778-01 Network Infrastructure (1) ATP500 View device webpage Disable Delete Create shortcut Properties

3 In the Internet Connection Properties window, click Settings to see port mappings.

Figure 264 Internet Connection Properties
ATP500 Properties General Network Device Connect to the Internet using: Internet Connection This connection allows you to connect to the Internet through a shared connection on another computer. Settings... OK Cancel Apply

4 You may edit or delete the port mappings or click Add to manually add port mappings.

Figure 265 Internet Connection Properties: Advanced Settings
Advanced Settings Services Select the services running on your network that Internet users can access. Services: Test Add... Edit... Delete OK Cancel

Figure 266 Internet Connection Properties: Advanced Settings: Add
Service Settings Description of service: Name or IP address (for example 132.163.0.12) of the computer hosting this service on your network: External Port number for this service: TCP UDP Internal Port number for this service: OK Cancel

Note: When the UPnP-enabled device is disconnected from your computer, all port mappings will be deleted automatically.

5 Click OK. Check the network icon on the system tray to see your Internet connection status.

Figure 267 System Tray Icon
ZYXEL USGFLEX700-GB0101F - Auto-discover Your UPnP-enabled Network Device - 5

6 To see more details about your current Internet connection status, right click on the network icon in the system tray and click Open Network and Sharing Center. Click Local Area Network.

Figure 268 Internet Connection Status
Local Area Connection Status General Connection IPv4 Connectivity: Internet IPv6 Connectivity: No network access Media State: Enabled Duration: 01:59:27 Speed: 1.0 Gbps Details... Activity Sent — Received Bytes: 3,801,308 | 11,278,356 Properties Disable Diagnose Close

15.4.2 Turn on UPnP in Windows 10 Example

This section shows you how to use the UPnP feature in Windows 10. UPnP server is installed in Windows 10. Activate UPnP on the Zyxel Device by clicking Network Setting > Home Networking > UPnP.

Make sure the computer is connected to the LAN port of the Zyxel Device. Turn on your computer and the Zyxel Device.

1 Click the start icon, Settings and then Network & Internet.

Settings Windows Settings Find a setting System Display, sound, notifications, power Devices Bluetooth, printers, mouse Phone Link your Android, iPhone Network & Internet Wi-Fi, airplane mode, VPN Personalization Background, lock screen, colors Apps Uninstall, defaults, optional features Accounts Your accounts, email, sync work, other people Time & Language Speech, region, date Gaming Game bar, DVR, broadcasting, Game Mode Ease of Access Narrator, magnifier, high control Privacy Location, camera Update & Security Windows Update, recovery, backup Search Language, permissions, history

2 Click Network and Sharing Center.

Settings Home Find a setting Network & Internet Status Ethernet 2 Private network You're connected to the Internet If you have a limited data plan, you can make this network a metered connection or change other properties. Change connection properties Show available networks Change your network settings Change adapter options View network adapters and change connection settings. Sharing options For the networks you connect to, decide what you want to share. Network troubleshooter Diagnose and fix network problems. View your network properties Windows Firewall Network and Sharing Center Network reset Have a question? Get help Make Windows better Give us feedback

3 Click Change advanced sharing settings.

Network and Sharing Center Control Panel Home Change adapter settings Change advanced sharing settings View your basic network information and set up connections View your active networks Network 2 Private network Access type: Internet Connections: Ethernet 2 Change your networking settings Set up a new connection or network Set up a broadband, dial-up, or VPN connection; or set up a router or access point. Troubleshoot problems Diagnose and repair network problems, or get troubleshooting information. See also Infrared Internet Options Windows Defender Firewall

4 Under Domain, select Turn on network discovery and click Save Changes. Network discovery allows your computer to find other computers and devices on the network and other computers on the network to find your computer. This makes it easier to share files and printers.

Advanced sharing settings Control Panel > All Control Panel Items > Network and Sharing Center > Advanced sharing settings Search Control Panel Change sharing options for different network profiles Windows creates a separate network profile for each network you use. You can choose specific options for each profile. Private (current profile) Guest or Public Domain Network discovery When network discovery is on, this computer can see other network computers and devices and is visible to other network computers. ● Turn on network discovery ○ Turn off network discovery File and printer sharing When file and printer sharing is on, files and printers that you have shared from this computer can be accessed by people on the network. ● Turn on file and printer sharing ○ Turn off file and printer sharing All Networks Save changes Cancel

15.4.3 Auto-discover Your UPnP-enabled Network Device

Before you follow these steps, make sure you already have UPnP activated on the Zyxel Device and in your computer.

Make sure your computer is connected to the LAN port of the Zyxel Device.

1 Open File Explorer and click Network.

2 Right-click the Zyxel Device icon and select Properties.

Figure 269 Network Connections
File Network View Properties Open Connect with Remote Desktop Connection Add devices and printers View printers View device webpage Search Active Directory Network and Location Network Network File sharing is turned off. Some network computers and devices might not be visible. Click to change... Quick access OneDrive This PC 3D Objects Desktop Documents Downloads Music Pictures Videos Local Disk (C:) Network Network Infrastructure (1) ATP500 View device webpage Disable Internet connectivity Delete Create shortcut Properties Network

3 In the Internet Connection Properties window, click Settings to see port mappings.

Figure 270 Internet Connection Properties
Internet10 M23 Properties General Network Device Connect to the Internet using: Internet Connection This connection allows you to connect to the Internet through a shared connection on another computer. Settings... OK Cancel Apply

4 You may edit or delete the port mappings or click Add to manually add port mappings.

Figure 271 Internet Connection Properties: Advanced Settings
Advanced Settings Services Select the service running on your network that Internet users can access. Services: Test Add... Edit... Delete OK Cancel

Figure 272 Internet Connection Properties: Advanced Settings: Add
Service Settings Description of service: Name or IP address (for example 192.168.0.12) of the computer hosting this service on your network: External Port number for this service: TCP UDP Internal Port number for this service: OK Cancel

Note: When the UPnP-enabled device is disconnected from your computer, all port mappings will be deleted automatically.

5 Click OK. Check the network icon on the system tray to see your Internet connection status.

Figure 273 System Tray Icon
ZYXEL USGFLEX700-GB0101F - Auto-discover Your UPnP-enabled Network Device - 5

6 To see more details about your current Internet connection status, right click the network icon in the system tray and click Open Network & Internet settings. Click Network and Sharing Center and click the Connections.

Figure 274 Internet Connection Status
Network and Sharing Center Control Panel > All Control Panel Items > Network and Sharing Center Search Control Panel Control Panel Home View your basic network information and set up connections Change adapter settings Change advanced sharing settings View your active networks Network 2 Private network Access type: Internet Connections: Ethernet 2 Change your networking settings Set up a new connection or network Set up a broadband, dial-up, or VPN connection; or set up a router or access point. Troubleshoot problems Diagnose and repair network problems, or get troubleshooting information. Ethernet 2 Status General Connection IPv6 Connectivity: Internet IPv6 Connectivity: No network access Media State: Enabled Duration: 04:07:35 Speed: 1.0 Gbps Details... Activity Sant — Received Bytes: 2,173,640 | 20,849,403 Properties Disable Diagnose Close See also Infrared Internet Options Windows Defender Firewall

15.4.4 Web Configurator Easy Access in Windows 7

With UPnP, you can access the web-based configurator on the Zyxel Device without finding out the IP address of the Zyxel Device first. This comes helpful if you do not know the IP address of the Zyxel Device.

Follow the steps below to access the web configurator.

1 Open Windows Explorer.
2 Click Network.

Figure 275 Network Connections
Network Organize Network and Sharing Center Add a printer Add a wireless device Favorites Desktop Downloads Recent Places Libraries Documents Music Pictures Videos Computer Local Disk (C:) Local Disk (D:) zytw tem cso_ Tecl Network Computer (1) TWPCZT02778-01 Network Infrastructure (1) ATP500

3 An icon with the description for each UPnP-enabled device displays under Network Infrastructure.
4 Right-click on the icon for your Zyxel Device and select View device webpage. The web configurator login screen displays.

Figure 276 Network Connections: My Network Places
Network Organize Search Active Directory Network and Sharing Center Add a printer Add a wireless de Favorites Desktop Downloads Recent Places Libraries Documents Music Pictures Videos Computer Local Disk (C:) Local Disk (D:) zytw temp cso_i Tech Network Computer (1) TWPCZT02778-01 Network Infrastructure (1) ATP500 View device webpage Enable Delete Create shortcut Properties

5 Right-click on the icon for your Zyxel Device and select Properties. Click the Network Device tab. A window displays with information about the Zyxel Device.

Figure 277 Network Connections: My Network Places: Properties: Example
ATP500 Properties General Network Device ATP500 Device Details Manufacturer: ZyXEL http://www.zyxel.com Model: ATP500 http://www.zyxel.com Model number: ATP500 Device webpage: http://192.168.1.1/ Troubleshooting Information Serial number: S16 MAC address: b8: Unique identifier: uuii IP address: 19; OK Cancel Apply

15.4.5 Web Configurator Easy Access in Windows 10

Follow the steps below to access the Web Configurator.

1 Open File Explorer.

2 Click Network.

Figure 278 Network Connections
Network File Network View Properties Open Connect with Remote Desktop Connection Location Add devices and printers View printers View device webpage Search Active Directory Network Network and Sharing Center ← → ↗ > Network File sharing is turned off. Some network computers and devices might not be visible. Click to change... Quick access OneDrive This PC 3D Objects Desktop Documents Downloads Music Pictures Videos Local Disk (C:) Network Network Infrastructure (1) ATP500

3 An icon with the description for each UPnP-enabled device displays under Network Infrastructure.
4 Right-click the icon for your Zyxel Device and select View device webpage. The Web Configurator login screen displays.

Figure 279 Network Connections: Network Infrastructure
Network File Network View Properties Open Connect with Remote Desktop Connection Location View printers View device webpage Search Active Directory Network Network and Sharing Center ← → ↗ > Network File sharing is turned off. Some network computers and devices might not be visible. Click to change... Quick access OneDrive This PC 3D Objects Desktop Documents Downloads Music Pictures Videos Local Disk (C:) Network Network Infrastructure (1) ATP500 View device webpage Disable Internet connectivity Delete Create shortcut Properties

5 Right-click the icon for your Zyxel Device and select Properties. Click the Network Device tab. A window displays information about the Zyxel Device.

Figure 280 Network Connections: Network Infrastructure: Properties: Example
LTE7240-M403 Properties General Network Device ATP500 Device Details Manufacturer: ZyXEL http://www.zyxel.com/ Model: ATP500 http://www.zyxel.com/ Model number: 1.0 Device webpage: http://192.168.1.1:80/ Troubleshooting Information Serial number: S180Y06018918 MAC address: 84:aa:9c:83:b9:03 Unique identifier: uuid:b2769a5f-4a9c-4ea5-9818-c76069d43739 IP address: 192.168.1.1 OK Cancel Apply

CHAPTER 16

IP/ MAC Binding

16.1 IP/MAC Binding Overview

IP address to MAC address binding helps ensure that only the intended devices get to use privileged IP addresses. The Zyxel Device uses DHCP to assign IP addresses and records the MAC address it assigned to each IP address. The Zyxel Device then checks incoming connection attempts against this list. A user cannot manually assign another IP to his computer and use it to connect to the Zyxel Device.

Suppose you configure access privileges for IP address 192.168.1.27 and use static DHCP to assign it to Tim's computer's MAC address of 12:34:56:78:90:AB. IP/MAC binding drops traffic from any computer trying to use IP address 192.168.1.27 with another MAC address.

Figure 281 IP/MAC Binding Example
ZYXEL USGFLEX700-GB0101F - IP/MAC Binding Overview - 1

flowchart
graph TD
    A["Tim"] -->|MAC: 12:34:56:78:90:AB\nIP: 192.168.1.27| B["Red Box"]
    C["Jim"] -->|MAC: AB:CD:EF:12:34:56\nIP: 192.168.1.27| B

16.1.1 What You Can Do in this Chapter

  • Use the Summary and Edit screens (Section 16.2 on page 404) to bind IP addresses to MAC addresses.
  • Use the Exempt List screen (Section 16.3 on page 407) to configure ranges of IP addresses to which the Zyxel Device does not apply IP/MAC binding.

16.1.2 What You Need to Know

DHCP

IP/MAC address bindings are based on the Zyxel Device's dynamic and static DHCP entries.

Interfaces Used With IP/MAC Binding

IP/MAC address bindings are grouped by interface. You can use IP/MAC binding with Ethernet, bridge, VLAN, and WLAN interfaces. You can also enable or disable IP/MAC binding and logging in an interface's configuration screen.

16.2 IP/MAC Binding Summary

Click Configuration > Network > IP/MAC Binding to open the IP/MAC Binding Summary screen. This screen lists the total number of IP to MAC address bindings for devices connected to each supported interface.

Figure 282 Configuration > Network > IP/MAC Binding > Summary
Summary Exempt List IP/MAC Binding Summary Edit Activate Inactivate Sta... Interface Number of Binding 1 dmz 0 2 lan1 0 3 lan2 0 4 reserved 0 5 sfp 0 6 wan1 0 7 wan2 0 Page 1 of 1 Show 50 items Displaying 1 - 7 of 7 Apply Reset

The following table describes the labels in this screen.

Table 156 Configuration > Network > IP/MAC Binding > Summary

LABEL DESCRIPTION
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
# This field is a sequential value, and it is not associated with a specific entry.
StatusThis icon is lit when the entry is active and dimmed when the entry is inactive.
Interface This is the name of an interface that supports IP/MAC binding.
Number of BindingThis field displays the interface's total number of IP/MAC bindings and IP addresses that the interface has assigned by DHCP.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

16.2.1 IP/MAC Binding Edit

Click Configuration > Network > IP/MAC Binding > Edit to open the IP/MAC Binding Edit screen. Use this screen to configure an interface's IP to MAC address binding settings.

Figure 283 Configuration > Network > IP/MAC Binding > Edit
Edit IP/MAC Binding IP/MAC Binding Settings Interface Name: dmz(192.168.3.1/255.255.255.0) Enable IP/MAC Binding Enable Logs for IP/MAC Binding Violation Static DHCP Bindings Add Edit Remove IP Address MAC Address Description Page 0 of 0 Show 50 items No data to display OK Cancel

The following table describes the labels in this screen.

Table 157 Configuration > Network > IP/MAC Binding > Edit

LABEL DESCRIPTION
IP/MAC Binding Settings
Interface NameThis field displays the name of the interface within the Zyxel Device and the interface's IP address and subnet mask.
Enable IP/MAC BindingSelect this option to have this interface enforce links between specific IP addresses and specific MAC addresses. This stops anyone else from manually using a bound IP address on another device connected to this interface. Use this to make use only the intended users get to use specific IP addresses.
Enable Logs for IP/MAC Binding ViolationSelect this option to have the Zyxel Device generate a log if a device connected to this interface attempts to use an IP address not assigned by the Zyxel Device.
Static DHCP BindingsThis table lists the bound IP and MAC addresses. The Zyxel Device checks this table when it assigns IP addresses. If the computer's MAC address is in the table, the Zyxel Device assigns the corresponding IP address. You can also access this table from the interface's edit screen.
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
# This is the index number of the static DHCP entry.
IP AddressThis is the IP address that the Zyxel Device assigns to a device with the entry's MAC address.
MAC AddressThis is the MAC address of the device to which the Zyxel Device assigns the entry's IP address.
Description This helps identify the entry.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

16.2.2 Static DHCP Edit

Click Configuration > Network > IP/MAC Binding > Edit to open the IP/MAC Binding Edit screen. Click the Add or Edit icon to open the following screen. Use this screen to configure an interface's IP to MAC address binding settings.

Figure 284 Configuration > Network > IP/MAC Binding > Edit > Add
Add Static DHCP Rule Interface Name: dmz(192.168.3.1/255.4 IP Address: MAC Address: Description: (Optional) OK Cancel

The following table describes the labels in this screen.

Table 158 Configuration > Network > IP/MAC Binding > Edit > Add

LABEL DESCRIPTION
Interface NameThis field displays the name of the interface within the Zyxel Device and the interface's IP address and subnet mask.
IP AddressEnter the IP address that the Zyxel Device is to assign to a device with the entry's MAC address.
MAC AddressEnter the MAC address of the device to which the Zyxel Device assigns the entry's IP address.
DescriptionEnter up to 64 printable ASCII characters to help identify the entry. For example, you may want to list the computer's owner.
OK Click OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

16.3 IP/MAC Binding Exempt List

Click Configuration > Network > IP/MAC Binding > Exempt List to open the IP/MAC Binding Exempt List screen. Use this screen to configure ranges of IP addresses to which the Zyxel Device does not apply IP/MAC binding.

Figure 285 Configuration > Network > IP/MAC Binding > Exempt List
Summary Exempt List IP/MAC Binding Exempt List Add Edit Remove Name Start IP End IP Page 0 of 0 Show 50 Items No data to display Apply

The following table describes the labels in this screen.

Table 159 Configuration > Network > IP/MAC Binding > Exempt List

LABEL DESCRIPTION
Add Click this tocreate a new entry.
EditClick an entry or select it and click Edit to modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
# This is the indexnumber of the IP/MAC binding list entry.
Name Enter a name to help identify this entry.
Start IPEnter the first IP address in a range of IP addresses for which the Zyxel Device does not apply IP/MAC binding.
End IPEnter the last IP address in a range of IP addresses for which the Zyxel Device does not apply IP/MAC binding.
Add iconClick the Add icon to add a new entry.Click the Remove icon to delete an entry. A window displays asking you to confirm that you want to delete it.
ApplyClick Apply to save your changes back to the Zyxel Device.

CHAPTER 17

Layer 2 Isolation

17.1 Overview

Layer-2 isolation is used to prevent connected devices from communicating with each other in the Zyxel Device's local network(s), except for the devices in the white list, when layer-2 isolation is enabled on the Zyxel Device and the local interface(s).

Note: The security policy control must be enabled before you can use layer-2 isolation.

In the following example, layer-2 isolation is enabled on the Zyxel Device's interface Vlan1. A printer, PC and AP are in the Vlan1. The IP address of network printer (C) is added to the white list. With this setting, the connected AP then cannot communicate with the PC (D), but can access the network printer (C), server (B), wireless client (A) and the Internet.

Figure 286 Layer-2 Isolation Application
ZYXEL USGFLEX700-GB0101F - Overview - 1

flowchart
graph TD
    subgraph_Server_A["Server A"]
        A1["Computer"] -->|Wireless Signal| A2["Red Box"]
        A3["Computer"] -->|Wireless Signal| A2
        A4["Computer"] -->|Wireless Signal| A2
        A5["Computer"] -->|Wireless Signal| A2
    end

    subgraph_Server_B["Server B"]
        B1["Computer"] -->|Wireless Signal| B2["Red Box"]
        B3["Computer"] -->|Wireless Signal| B2
        B4["Computer"] -->|Wireless Signal| B2
        B5["Computer"] -->|Wireless Signal| B2
    end

    subgraph_VLAN_1["VLAN 1"]
        C1["Computer C"] -->|Wireless Signal| C2["Red Dot"]
        C2 -->|Wireless Signal| C1
        C3["Computer D"] -->|Wireless Signal| C2
        C4["Computer D"] -->|Wireless Signal| C2
        C5["Computer D"] -->|Wireless Signal| C2
    end

    A2 --> VLAN_1
    B2 --> VLAN_1
    C2 --> VLAN_1
    C3 --> VLAN_1
    C4 --> VLAN_1
    C5 --> VLAN_1

    VLAN_1 --> Internet["Internet"]
    style VLAN_1 fill:#f9f,stroke:#333

17.1.1 What You Can Do in this Chapter

  • Use the General screen (Section 17.2 on page 408) to enable layer-2 isolation on the Zyxel Device and the internal interface(s).
  • Use the White List screen (Section 17.3 on page 409) to enable and configures the white list.

17.2 Layer-2 Isolation General Screen

This screen allows you to enable Layer-2 isolation on the Zyxel Device and specific internal interface(s). To access this screen click Configuration > Network > Layer 2 Isolation.

Figure 287 Configuration > Network > Layer 2 Isolation
General White List General Setting Enable Layer 2 Isolation Member List Available dmz lan1 lan2 reserved Member Apply Reset

The following table describes the labels in this screen.

Table 160 Configuration > Network > Layer 2 Isolation

LABEL DESCRIPTION
Enable Layer2 IsolationSelect this option to turn on the layer-2 isolation feature on the Zyxel Device.Note: You can enable this feature only when the security policy is enabled.
Member ListThe Available list displays the name(s) of the internal interface(s) on which you can enable layer-2 isolation.To enable layer-2 isolation on an interface, you can double-click a single entry to move it or use the [Shift] or [Ctrl] key to select multiple entries and click the right arrow button to add to the Member list. To remove an interface, select the name(s) in the Member list and click the left arrow button.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

17.3 White List Screen

IP addresses that are not listed in the white list are blocked from communicating with other devices in the layer-2-isolation-enabled internal interface(s) except for broadcast packets.

To access this screen click Configuration > Network > Layer 2 Isolation > White List.

Figure 288 Configuration > Network > Layer 2 Isolation > White List
General White List General Setting Enable White List White List Summary Add Edit Remove Activate Inactivate Status IP Address Description Page 0 of 0 Show 50 items No data to display Apply Reset

The following table describes the labels in this screen.

Table 161 Configuration > Network > Layer 2 Isolation > White List

LABEL DESCRIPTION
Enable White ListSelect this option to turn on the white list on the Zyxel Device.Note: You can enable this feature only when the security policy is enabled.
Add Click this to add a new rule.
Edit Click this to edit the selected rule.
Remove Click this to remove the selected rule.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
# This field is a sequential value, and it is not associated with a specific rule.
StatusThis icon is lit when the rule is active and dimmed when the rule is inactive.
IP AddressThis field displays the IP address of device that can be accessed by the devices connected to an internal interface on which layer-2 isolation is enabled.
Description This field displays the description for the IP address in this rule.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

17.3.1 Add/Edit White List Rule

This screen allows you to create a new rule in the white list or edit an existing one. To access this screen, click the Add button or select an entry from the list and click the Edit button.

Note: You can configure up to 100 white list rules on the Zyxel Device.

Note: You need to know the IP address of each connected device that you want to allow to be accessed by other devices when layer-2 isolation is enabled.

Figure 289 Configuration > Network > Layer 2 Isolation > White List > Add/Edit
Add corresponding Settings Enable Host IP Address: Description: (Optional) OK Cancel

The following table describes the labels in this screen.

Table 162 Configuration > Network > Layer 2 Isolation > White List > Add/Edit

LABEL DESCRIPTION
Enable Select this option to turn on the rule.
Host IP Address Enter an IPv4 address associated with this rule.
DescriptionSpecify a description for the IP address associated with this rule. Enter up to 60 characters, spaces and underscores allowed.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving your changes.

CHAPTER 18

DNS Inbound LB

18.1 DNS Inbound Load Balancing Overview

Inbound load balancing enables the Zyxel Device to respond to a DNS query message with a different IP address for DNS name resolution. The Zyxel Device checks which member interface has the least load and responds to the DNS query message with the interface's IP address.

In the following figure, an Internet host (A) sends a DNS query message to the DNS server (D) in order to resolve a domain name of www.example.com. DNS server D redirects it to the Zyxel Device (Z)'s WAN1 with an IP address of 1.1.1.1. The Zyxel Device receives the DNS query message and responds to it with the WAN2's IP address, 2.2.2.2, because the WAN2 has the least load at that moment.

Another Internet host (B) also sends a DNS query message to ask where www.example.com is. The Zyxel Device responds to it with the WAN1's IP address, 1.1.1.1, since WAN1 has the least load this time.

Figure 290 DNS Load Balancing Example
ZYXEL USGFLEX700-GB0101F - DNS Inbound Load Balancing Overview - 1

flowchart
graph TD
    subgraph_Entity1["Entity 1"]
        A1["Where is www.example.com?"] -->|A: 2.2.2.2| D1["D"]
        B1["Where is www.example.com?"] -->|D: Ask 1.1.1.1| A2["A"]
    end
    subgraph_Entity2["Entity 2"]
        A2["Where is www.example.com?"] -->|B: 1.1.1.1| D2["D"]
        B2["Where is www.example.com?"] -->|B: Ask 1.1.1.1| A3["A"]
    end
    Entity1 -->|Z: 2.2.2.2| Z1["Z"]
    Entity2 -->|Z: 2.2.2.2| Z2["Z"]
    Z1 -->|1.1.1.1| Z3["Z"]
    Z2 -->|1.1.1.1| Z4["Z"]
    Z3 -->|2.2.2.2| Z5["Z"]
    Z4 -->|3.2.2.2| Z6["Z"]
    Z5 -->|3.2.2.2| Z7["Z"]
    Z6 -->|3.2.2.2| Z8["Z"]
    Z7 -->|3.2.2.2| Z9["Z"]
    Z8 -->|3.2.2.2| Z10["Z"]
    Z9 -->|3.2.2.2| Z11["Z"]
    Z10 -->|3.2.2.2| Z12["Z"]
    Z11 -->|3.2.2.2| Z13["Z"]
    Z12 -->|3.2.2.2| Z14["Z"]

18.1.1 What You Can Do in this Chapter

  • Use the Inbound LB screen (see Section 18.2 on page 413) to view a list of the configured DNS load balancing rules.
  • Use the Inbound LB Add/Edit screen (see Section 18.2.1 on page 414) to add or edit a DNS load balancing rule.

18.2 The DNS Inbound LB Screen

The Inbound LB screen provides a summary of all DNS load balancing rules and the details. You can also use this screen to add, edit, or remove the rules. Click Configuration > Network > Inbound LB to open the following screen.

Note: After you finish the inbound load balancing settings, go to security policy and NAT screens to configure the corresponding rule and virtual server to allow the Internet users to access your internal servers.

Figure 291 Configuration > Network > DNS Inbound LB
DNS Load Balancing Global Setting Enable DNS Load Balancing Configuration Add Edit Remove Activate Inactivate Move St... Pr... Query Domain... Query ... Query ... Load Balanci... Algorithm Page 0 of 0 Show 50 items No data to display Apply Reset

The following table describes the labels in this screen.

Table 163 Configuration > Network > DNS Inbound LB

LABEL DESCRIPTION
Global Setting
Enable DNS Load BalancingSelect this to enable DNS load balancing.
Configuration
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
MoveTo move an entry to a different number in the list, click the Move icon. In the field that appears, specify the number to which you want to move the entry.
StatusThis icon is lit when the entry is active and dimmed when the entry is inactive.
PriorityThis field displays the order in which the Zyxel Device checks the member interfaces of this DNS load balancing rule.
Query Domain NameThis field displays the domain name for which the Zyxel Device manages load balancing between the specified interfaces.
Query From AddressThis field displays the source IP address of the DNS query messages to which the Zyxel Device applies the DNS load balancing rule.
Query From ZoneThe Zyxel Device applies the DNS load balancing rule to the query messages received from this zone.
Load Balancing MemberThis field displays the member interfaces which the Zyxel Device manages for load balancing.
AlgorithmThis field displays the load balancing method the Zyxel Device uses for this DNS load balancing rule.Weighted Round Robin- Each member interface is assigned a weight. An interface with a larger weight gets more chances to transmit traffic than an interface with a smaller weight. For example, if the weight ratio of wan1 and wan2 interfaces is 2:1, the Zyxel Device chooses wan1 for 2 sessions' traffic and wan2 for 1 session's traffic in each round of 3 new sessions.Least Connection- The Zyxel Device chooses choose a member interface which is handling the least number of sessions.Least Load - Outbound- The Zyxel Device chooses a member interface which is handling the least amount of outgoing traffic.Least Load - Inbound- The Zyxel Device chooses a member interface which is handling the least amount of incoming traffic.Least Load - Total- The Zyxel Device chooses a member interface which is handling the least amount of outgoing and incoming traffic.
Apply Click this button to save your changes to the Zyxel Device.
ResetClick this button to return the screen to its last-saved settings.

18.2.1 The DNS Inbound LB Add/Edit Screen

The Add DNS Load Balancing screen allows you to add a domain name for which the Zyxel Device manages load balancing between the specified interfaces. You can configure the Zyxel Device to apply DNS load balancing to some specific hosts only by configuring the Query From settings. Click Configuration > Network > Inbound LB and then the Add or Edit icon to open this screen.

Figure 292 Configuration > Network > DNS Inbound LB > Add
Add DNS Load Balancing Create new Object▼ General Setting Enable DNS Settings Query Domain Name: Time to Live: 0 (0-604800 seconds, 0 is unchanged) Query From Settings IP Address: any Zone: any Load Balancing Member Load Balancing Algorithm: Weighted Round F Follower IP Address: 0.0.0.0 (Optional) Add Edit Remove IP Address Monitor Interface Weight Page 0 of 0 Show 50 Items No data to display If you want to configure Security Option Control, please go to DNS OK Cancel

The following table describes the labels in this screen.

Table 164 Configuration > Network > DNS Inbound LB > Add/Edit

LABEL DESCRIPTION
Create New ObjectUse this to configure any new setting objects that you need to use in this screen.
General Settings
Enable Select this to enable this DNS load balancing rule.
DNS Settings
Query Domain NameType up to 255 characters for a domain name for which you want the Zyxel Device to manage DNS load balancing. You can use a wildcard (*) to let multiple domains match the name. For example, use *.example.com to specify any domain name that ends with “example.com” would match.
Time to LiveEnter the number of seconds the Zyxel Device recommends DNS request hosts to keep the DNS entry in their caches before removing it. Enter 0 to have the Zyxel Device not recommend this so the DNS request hosts will follow their DNS server’s TTL setting.
Query From Setting
IP AddressSelect the name of an P address object, including geographic address object, of a computer or a DNS server which makes the DNS queries upon which to apply this rule.DNS servers process client queries using recursion or iteration:In recursion, DNS servers make recursive queries on behalf of clients. So you have to configure this field to the DNS server’s IP address when recursion is used.In iteration, a client asks the DNS server and expects the best and immediate answer without the DNS server contacting other DNS servers. If the primary DNS server cannot provide the best answer, the client makes iteration queries to other configured DNS servers to resolve the name. You have to configure this field to the client’s IP address when iteration is used.
ZoneSelect the zone of DNS query messages upon which to apply this rule.
Load Balancing Member
Load Balancing AlgorithmSelect a load balancing method to use from the drop-down list box.SelectWeighted Round Robinto balance the traffic load between interfaces based on their respective weights. An interface with a larger weight gets more chances to transmit traffic than an interface with a smaller weight. For example, if the weight ratio of wan1 and wan2 interfaces is 2:1, the Zyxel Device chooses wan1 for 2 sessions' traffic and wan2 for every session's traffic in each round of 3 new sessions.SelectLeast Connectionto have the Zyxel Device choose the member interface which is handling the least number of sessions.SelectLeast Load - Outboundto have the Zyxel Device choose the member interface which is handling the least amount of outgoing traffic.SelectLeast Load - Inboundto have the Zyxel Device choose the member interface which is handling the least amount of incoming traffic.SelectLeast Load - Totalto have the Zyxel Device choose the member interface which is handling the least amount of outgoing and incoming traffic.
Failover IP AddressEnter an alternate IP address with which the Zyxel Device will respond to a DNS query message when the load balancing algorithm cannot find any available interface.
Add Click this to create a new member interface for this rule.
EditDouble-click an entry or select it and clickEditto open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and clickRemove. The Zyxel Device confirms you want to remove it before doing so.
#This field displays the order in which the Zyxel Device checks this rule's member interfaces.
IP Address This field displays the IP address of the member interface.
Monitor InterfaceThis field displays the name of the member interface. The Zyxel Device manages load balancing between the member interfaces.
WeightThis field is available if you selectedWeighted Round Robinas the load balancing algorithm. This field displays the weight of the member interface. An interface with a larger weight gets more chances to transmit traffic than an interface with a smaller weight.
OKClick OKto save your changes back to the Zyxel Device.
CancelClick Cancelto exit this screen without saving.

18.2.2 The DNS Inbound LB Add/Edit Member Screen

The Add Load Balancing Member screen allows you to add a member interface for the DNS load balancing rule. Click Configuration > Network > DNS Inbound LB > Add or Edit and then an Add or Edit icon to open this screen.

Figure 293 Configuration > Network > DNS Inbound LB > Add/Edit > Add
Add Load Balancing Member Load Balancing Member Member: Monitor Interface: wan1 Weight: 1 (1-10) IP Address ● Same as Monitor Interface 172.21.40.15 ○ Custom 0.0.0.0 DHCP client - 172.21.40.15/255.255.252.0 OK Cancel

The following table describes the labels in this screen.

Table 165 Configuration > Network > DNS Inbound LB > Add/Edit > Add/Edit

LABEL DESCRIPTION
MemberThe Zyxel Device checks each member interface's loading in the order displayed here.
Monitor InterfaceSelect an interface to associate it with the DNS load balancing rule. This field also displays whether the IP address is a static IP address (Static), dynamically assigned (Dynamic) or obtained from a DHCP server (DHCP Client), as well as the IP address and subnet mask.
WeightThis field is available if you selected Weighted Round Robin for the load balancing algorithm.Specify the weight of the member interface. An interface with a larger weight gets more chances to transmit traffic than an interface with a smaller weight.
IP Address
Same as Monitor InterfaceSelect this to send the IP address displayed in the Monitor Interface field to the DNS query senders.
CustomSelect this and enter another IP address to send to the DNS query senders.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

CHAPTER 19 IPSec VPN

19.1 Virtual Private Networks (VPN) Overview

A virtual private network (VPN) provides secure communications between sites without the expense of leased site-to-site lines. A secure VPN is a combination of tunneling, encryption, authentication, access control and auditing. It is used to transport traffic over the Internet or any insecure network that uses TCP/IP for communication.

IPSec VPN

Internet Protocol Security (IPSec) VPN connects IPSec routers or remote users using IPSec client software. This standards-based VPN offers flexible solutions for secure data communications across a public network. IPSec is built around a number of standardized cryptographic techniques to provide confidentiality, data integrity and authentication at the IP layer. The Zyxel Device can also combine multiple IPSec VPN connections into one secure network. Here local Zyxel Device X uses an IPSec VPN tunnel to remote (peer) Zyxel Device Y to connect the local (A) and remote (B) networks.

Figure 294 IPSec VPN Example
ZYXEL USGFLEX700-GB0101F - IPSec VPN - 1

flowchart
graph LR
    subgraph A
        A1["Computer"] --> A2((X))
        A2 --> A3["Computer"]
        A3 --> A4["Computer"]
    end
    subgraph X
        X1["Internet"] --> X2["VPN Tunnel"]
    end
    subgraph Y
        Y1["Computer"] --> Y2((X))
        Y2 --> Y3["Computer"]
        Y3 --> Y4["Computer"]
    end

Internet Key Exchange (IKE): IKEv1 and IKEv2

The Zyxel Device supports IKEv1 and IKEv2 for IPv4 and IPv6 traffic. IKE (Internet Key Exchange) is a protocol used in setting up security associations that allows two parties to send data securely.

IKE uses certificates or pre-shared keys for authentication and a Diffie-Hellman key exchange to set up a shared session secret from which encryption keys are derived. A security policy for each peer must be manually created.

IPSec VPN consists of two phases: Phase 1 and Phase 2. Phase 1's purpose is to establish a secure authenticated communication channel by using the Diffie-Hellman key exchange algorithm to generate a shared secret key to encrypt IKE communications. This negotiation results in one single bidirectional ISAKMP Security Association (SA). The authentication can be performed using either pre-

shared key (shared secret), signatures, or public key encryption. Phase 1 operates in either Main Mode or Aggressive Mode. Main Mode protects the identity of the peers, but Aggressive Mode does not.

During Phase 2, the remote IPSec routers use the secure channel established in Phase 1 to negotiate Security Associations for IPSec. The negotiation results in a minimum of two unidirectional security associations (one inbound and one outbound). Phase 2 uses Quick Mode (only). Quick mode occurs after IKE has established the secure tunnel in Phase 1. It negotiates a shared IPSec policy, derives shared secret keys used for the IPSec security algorithms, and establishes IPSec SAs. Quick mode is also used to renegotiate a new IPSec SA when the IPSec SA lifetime expires.

In the Zyxel Device, use the VPN Connection tab to set up Phase 2 and the VPN Gateway tab to set up Phase 1.

Some differences between IKEv1 and IKEv2 include:

  • IKEv2 uses less bandwidth than IKEv1. IKEv2 uses one exchange procedure with 4 messages. IKEv1 uses two phases with Main Mode (9 messages) or Aggressive Mode (6 messages) in phase 1.
  • IKEv2 supports Extended Authentication Protocol (EAP) authentication, and IKEv1 supports X-Auth. EAP is important when connecting to existing enterprise authentication systems.
  • IKEv2 always uses NAT traversal and Dead Peer Detection (DPD), but they can be disabled in IKEv1 using Zyxel Device firmware (the default is on).
  • Configuration payload (includes the IP address pool in the VPN setup data) is supported in IKEv2 (off by default), but not in IKEv1.
  • Narrowed is supported in IKEv2, but not in IKEv1. Narrowed has the SA apply only to IP addresses in common between the Zyxel Device and the remote IPSec router.
  • The IKEv2 protocol supports connectivity checks which is used to detect whether the tunnel is still up or not. If the check fails (the tunnel is down), IKEv2 can re-establish the connection automatically. The Zyxel Device uses firmware to perform connectivity checks when using IKEv1.

SSL VPN

SSL VPN uses remote users' web browsers to provide the easiest-to-use of the Zyxel Device's VPN solutions. A user just browses to the Zyxel Device's web address and enters his user name and password to securely connect to the Zyxel Device's network. Remote users do not need to configure security settings. Here a user uses his browser to securely connect to network resources in the same way as if he were part of the internal network. See Chapter 20 on page 454 for more on SSL VPN.

Figure 295 SSL VPN
ZYXEL USGFLEX700-GB0101F - SSL VPN - 1

flowchart
graph LR
    A["User"] -->|https://| B["Internet"]
    B --> C["LAN (192.168.1.X)"]
    C --> D["Web Mail File Share"]
    C --> E["Non-Web"]
    D --> F["Web-based Application"]
    E --> G["Application Server"]

L2TP VPN

L2TP VPN uses the L2TP and IPSec client software included in remote users' Android, iOS, or Windows operating systems for secure connections to the network behind the Zyxel Device. The remote users do not need their own IPSec gateways or third-party VPN client software. For example, configure sales representatives' laptops, tablets, or smartphones to securely connect to the Zyxel Device's network. See Chapter 21 on page 460 for more on L2TP over IPSec.

Figure 296 L2TP VPN
ZYXEL USGFLEX700-GB0101F - L2TP VPN - 1

flowchart
graph LR
    A["LAN"] --> B["Z"]
    B --> C["Internet"]
    C --> D["User Icon"]

19.1.1 What You Can Do in this Chapter

  • Use the VPN Connection screens (see Section 19.2 on page 423) to specify which IPSec VPN gateway an IPSec VPN connection policy uses, which devices behind the IPSec routers can use the VPN tunnel, and the IPSec SA settings (phase 2 settings). You can also activate or deactivate and connect or disconnect each VPN connection (each IPSec SA).
  • Use the VPN Gateway screens (see Section 19.2.1 on page 425) to manage the Zyxel Device's VPN gateways. A VPN gateway specifies the IPSec routers at either end of a VPN tunnel and the IKE SA settings (phase 1 settings). You can also activate and deactivate each VPN gateway.
  • Use the VPN Concentrator screens (see Section 19.4 on page 440) to combine several IPSec VPN connections into a single secure network.
  • Use the Configuration Provisioning screen (see Section 19.5 on page 442) to set who can retrieve VPN rule settings from the Zyxel Device using the Zyxel Device IPSec VPN Client.

19.1.2 What You Need to Know

An IPSec VPN tunnel is usually established in two phases. Each phase establishes a security association (SA), a contract indicating what security parameters the Zyxel Device and the remote IPSec router will use. The first phase establishes an Internet Key Exchange (IKE) SA between the Zyxel Device and remote IPSec router. The second phase uses the IKE SA to securely establish an IPSec SA through which the Zyxel Device and remote IPSec router can send data between computers on the local network and remote network. This is illustrated in the following figure.

Figure 297 VPN: IKE SA and IPSec SA
ZYXEL USGFLEX700-GB0101F - What You Need to Know - 1

flowchart
graph LR
    subgraph A
        A1["Computer"] --> X
        A2["Computer"] --> X
        A3["Computer"] --> X
        X -->|X| X2["Internet"]
        X2 -->|Y| Y
    end
    subgraph B
        B1["Computer"] --> X3["Internet"]
        B2["Computer"] --> X3
        B3["Computer"] --> X3
        X3 -->|X| X4["Internet"]
        X4 -->|Y| Y
        X4 -->|Y| Y2["Internet"]
        X2 -->|IPSec SA| X2
        X2 -->|IKE SA| X3
    end

In this example, a computer in network A is exchanging data with a computer in network B. Inside networks A and B, the data is transmitted the same way data is normally transmitted in the networks. Between routers X and Y, the data is protected by tunneling, encryption, authentication, and other security features of the IPSec SA. The IPSec SA is secure because routers X and Y established the IKE SA first.

Application Scenarios

The Zyxel Device's application scenarios make it easier to configure your VPN connection settings.

Table 166 IPSec VPN Application Scenarios

SITE-TO-SITESITE-TO-SITE WITH DYNAMIC PEERREMOTE ACCESS (SERVER ROLE)REMOTE ACCESS (CLIENT ROLE)VPN TUNNEL INTERFACE
ZYXEL USGFLEX700-GB0101F - Application Scenarios - 1ZYXEL USGFLEX700-GB0101F - Application Scenarios - 2ZYXEL USGFLEX700-GB0101F - Application Scenarios - 3ZYXEL USGFLEX700-GB0101F - Application Scenarios - 4ZYXEL USGFLEX700-GB0101F - Application Scenarios - 5
Choose this if the remote IPSec router has a static IP address or a domain name.This Zyxel Device can initiate the VPN tunnel.The remote IPSec router can also initiate the VPN tunnel if this Zyxel Device has a static IP address or a domain name.Choose this if the remote IPSec router has a dynamic IP address.You don't specify the remote IPSec router's address, but you specify the remote policy (the addresses of the devices behind the remote IPSec router).This Zyxel Device must have a static IP address or a domain name.Only the remote IPSec router can initiate the VPN tunnel.Choose this to allow incoming connections from IPSec VPN clients.The clients have dynamic IP addresses and are also known as dial-in users.You don't specify the addresses of the client IPSec routers or the remote policy.This creates a dynamic IPSec VPN rule that can let multiple clients connect.Only the clients can initiate the VPN tunnel.Choose this to connect to an IPSec server.This Zyxel Device is the client (dial-in user).Client role Zyxel Devices initiate IPSec VPN connections to a server role Zyxel Device.This Zyxel Device can have a dynamic IP address.The IPSec server doesn't configure this Zyxel Device's IP address or the addresses of the devices behind it.Only this Zyxel Device can initiate the VPN tunnel.Choose this to set up a VPN tunnel interface to bind with a VPN connection.The Zyxel Device can use the interface to do load balancing using a specific Trunk. The remote IPSec router should have a static IP address or a domain name.

Finding Out More

• See Section 19.6 on page 444 for IPSec VPN background information.
• See the help in the IPSec VPN quick setup wizard screens.

19.1.3 Before You Begin

This section briefly explains the relationship between VPN tunnels and other features. It also gives some basic suggestions for troubleshooting.

You should set up the following features before you set up the VPN tunnel.

  • In any VPN connection, you have to select address objects to specify the local policy and remote policy. You should set up the address objects first.
  • In a VPN gateway, you can select an Ethernet interface, virtual Ethernet interface, VLAN interface, or virtual VLAN interface to specify what address the Zyxel Device uses as its IP address when it establishes the IKE SA. You should set up the interface first.
  • In a VPN gateway, you can enable extended authentication. If the Zyxel Device is in server mode, you should set up the authentication method (AAA server) first. The authentication method specifies how the Zyxel Device authenticates the remote IPSec router.
  • In a VPN gateway, the Zyxel Device and remote IPSec router can use certificates to authenticate each other. Make sure the Zyxel Device and the remote IPSec router will trust each other's certificates.

19.2 The VPN Connection Screen

Click Configuration > VPN > IPSec VPN to open the VPN Connection screen. The VPN Connection screen lists the VPN connection policies and their associated VPN gateway(s), and various settings. In addition, it also lets you activate or deactivate and connect or disconnect each VPN connection (each IPSec SA). Click a column's heading cell to sort the table entries by that column's criteria. Click the heading cell again to reverse the sort order.

Click on the icons to go to the OneSecurity website where there is guidance on configuration walkthroughs, troubleshooting and other information.

Figure 298 Configuration > VPN > IPSec VPN > VPN Connection
VPN Connection VPN Gateway Concentrator Configuration Provisioning Global Setting Configuration Walkthrough Troubleshooting Download VPN Client VPN Use Policy Route to control dynamic IPSec rules Ignore "Don't Fragment" setting in IPv4 header IPv4 Configuration Add Edit Remove Activate Inactivate Connect Disconnect References Status Name VPN Gateway Gateway IP Version Policy 1 WIZ_VPN WIZ_VPN IPv4 WIZ_VPN_LOCAL... 2 WIZ_VPN_PROVISIONI... WIZ_VPN_PROVISIONING IPv4 WIZ_VPN_PROVISIONO... 3 Test Test IPv4 Test_LOCAL/ 4 WIZ_L2TP_VPN WIZ_L2TP_VPN IPv4 WIZ_L2TP_VPN_LOC... Page 1 of 1 Show 50 Items Displaying 1 - 4 of 4 IPv6 Configuration Add Edit Remove Activate Inactivate Connect Disconnect References Status Name VPN Gateway Gateway IP Version Policy Page 0 of 0 Show 50 Items No data to display Apply Reset

Each field is discussed in the following table.

Table 167 Configuration > VPN > IPSec VPN > VPN Connection

LABEL DESCRIPTION
Global Setting The following two fields are for all IPSec VPN policies.Click on the VPN icon to go to the Zyxel VPN Client product page at the Zyxel website.
Use Policy Route to control dynamic IPSec rulesSelect this to be able to use policy routes to manually specify the destination addresses of dynamic IPSec rules. You must manually create these policy routes. The Zyxel Device automatically obtains source and destination addresses for dynamic IPSec rules that do not match any of the policy routes.Clear this to have the Zyxel Device automatically obtain source and destination addresses for all dynamic IPSec rules.
Ignore "Don't Fragment" setting in packet headerSelect this to fragment packets larger than the MTU (Maximum Transmission Unit) that have the "Don't Fragment" bit in the IP header turned on. When you clear this the Zyxel Device drops packets larger than the MTU that have the "Don't Fragment" bit in the header turned on.
IPv4 / IPv6 Configuration
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
ConnectTo connect an IPSec SA, select it and click Connect.
DisconnectTo disconnect an IPSec SA, select it and click Disconnect.
ReferencesSelect an entry and clickReferencesto open a screen that shows which settings use the entry.SeeSection 9.4.4 on page 255 for an example.
#This field is a sequential value, and it is not associated with a specific connection.
StatusThe activate (light bulb) icon is lit when the entry is active and dimmed when the entry is inactive.The connect icon is lit when the interface is connected and dimmed when it is disconnected.
Name This field displays the name of the IPSec SA.
VPN GatewayThis field displays the VPN gateway in use for this VPN connection.
Gateway IP VersionThis field displays what IP version the associated VPN gateway(s) is using. An IPv4 gateway may use an IKEv1 or IKEv2 SA. An IPv6 gateway may use IKEv2 only.
PolicyThis field displays the local policy and the remote policy, respectively.
ApplyClickApplyto save your changes back to the Zyxel Device.
ResetClickResetto return the screen to its last-saved settings.

19.2.1 The VPN Connection Add/Edit Screen

The VPN Connection Add/ Edit Gateway screen allows you to create a new VPN connection policy or edit an existing one. To access this screen, go to the Configuration >VPN Connection screen (see Section 19.2 on page 423), and click either the Add icon or an Edit icon.

Figure 299 Configuration > VPN > IPSec VPN > VPN Connection > Add/Edit
Add VPN Connection Show Advanced Settings Create new Object General Settings Enable Connection Name: Advance Nalled-Up Enable Replay Detection Enable NetBIOS broadcast over IPSec MSS Adjustment Custom Size: 0 (200 - 1460 Bytes) Auto VPN Gateway Application Scenario Site-to-site Site-to-site with Dynamic Peer Remote Access (Server Role) Remote Access (Client Role) Vpn Tunnel Interface VPN Gateway: Please select one Policy Local policy: Please select one Remote policy: Please select one Advance Phase 2 Setting SA Life Time: 28800 (180 - 3000000 Seconds) Advance Related Settings Zone: IPSec_VPN Connectivity Check Enable Connectivity Check Check Method: lamp Check Period: 5 (5-600 Seconds) Check Timeout: 5 (1-10 Seconds) Check Fail Tolerance: [1-10] Check This Address (Domain Name or If Address) Check the First and Last If Address in the Remote Policy Log Advance Inbound/Outbound traffic NAT Outbound Traffic Source NAT Source: Please select one Destination: Please select one SNAT: Please select one Inbound Traffic Source NAT Source: Please select one Destination: Please select one SNAT: Please select one Destination NAT Add Edit Remove Move Original IP Mapped IP Protocol Original Port... Original Port... Mapped Port... Mapped Port... Page 0 of 0 Show 50 Items No data to display OK Cancel

Each field is described in the following table.

Table 168 Configuration > VPN > IPSec VPN > VPN Connection > Add/Edit

LABEL DESCRIPTION
Show Advanced Settings / Hide Advanced SettingsClick this button to display a greater or lesser number of configuration fields.
Create new ObjectUse to configure any new settings objects that you need to use in this screen.
General Settings
Enable Select this checkbox to activate this VPN connection.
Connection NameType the name used to identify this IPSec SA. You may use 1-31 alphanumeric characters, underscores (_), or dashes (-), but the first character cannot be a number. This value is case-sensitive.
Nailed-UpSelect this if you want the Zyxel Device to automatically renegotiate the IPSec SA when the SA life time expires.
Enable Replay DetectionSelect this check box to detect and reject old or duplicate packets to protect against Denial-of-Service attacks.
Enable NetBIOS Broadcast over IPSecSelect this check box if you the Zyxel Device to send NetBIOS (Network Basic Input/Output System) packets through the IPSec SA.NetBIOS packets are TCP or UDP packets that enable a computer to connect to and communicate with a LAN. It may sometimes be necessary to allow NetBIOS packets to pass through IPSec SAs in order to allow local computers to find computers on the remote network and vice versa.
MSS AdjustmentSelectCustom Sizeto set a specific number of bytes for the Maximum Segment Size (MSS) meaning the largest amount of data in a single TCP segment or IP datagram for this VPN connection.Some VPN clients may not be able to use a custom MSS size if it is set too small. In that case those VPN clients will ignore the size set here and use the minimum size that they can use.SelectAutoto have the Zyxel Device automatically set the MSS for this VPN connection.
NarrowedThis is visible when you select any options in theVPN Gatewaysection except forVPN Tunnel Interface.If the IP range on the Zyxel Device (local policy) and the local IP range on the remote IPSec router overlap in an IKEv2 SA, then you may selectNarrowedto have the SA only apply to the IP addresses in common.Here are some examples.Zyxel Device (local policy) Remote IPSec routerIKEv2 SA-1 192.168.20.0/24 192.168.20.1 ~ 192.168.20.20Narrowed 192.168.20.1 ~ 192.168.20.20IKEv2 SA-2 192.168.30.50 ~ 192.168.30.70 192.168.30.60 ~ 192.168.30.80Narrowed 192.168.30.60 ~ 192.168.30.70
VPN Gateway
Application ScenarioSelect the scenario that best describes your intended VPN connection.Site-to-site - Choose this if the remote IPSec router has a static IP address or a domain name. This Zyxel Device can initiate the VPN tunnel.Site-to-site with Dynamic Peer - Choose this if the remote IPSec router has a dynamic IP address. Only the remote IPSec router can initiate the VPN tunnel.Remote Access (Server Role) - Choose this to allow incoming connections from IPSec VPN clients. The clients have dynamic IP addresses and are also known as dial-in users. Only the clients can initiate the VPN tunnel.Remote Access (Client Role) - Choose this to connect to an IPSec server. This Zyxel Device is the client (dial-in user) and can initiate the VPN tunnel.VPN Tunnel Interface - Choose this to set up a VPN tunnel interface to bind with a VPN connection. The Zyxel Device can use the interface to do load balancing using a specific Trunk. The remote IPSec router should have a static IP address or a domain name. SeeConfiguration > Network > Interface > VTI.
VPN GatewaySelect the VPN gateway this VPN connection is to use or selectCreate Objectto add another VPN gateway for this VPN connection to use.
Policy
Local PolicySelect the address corresponding to the local network. UseCreate new Objectif you need to configure a new one.
Remote PolicySelect the address corresponding to the remote network. UseCreate new Objectif you need to configure a new one.
Enable GRE over IPSecSelect this to allow traffic using the Generic Routing Encapsulation (GRE) tunneling protocol through an IPSec tunnel.
Policy EnforcementClear this to allow traffic with source and destination IP addresses that do not match the local and remote policy to use the VPN tunnel. Leave this cleared for free access between the local and remote networks.Selecting this restricts who can use the VPN tunnel. The Zyxel Device drops traffic with source and destination IP addresses that do not match the local and remote policy.
Mode ConfigThis is visible when you selectRemote Access (Server Role) and a VPN Gateway.
Enable Mode ConfigSelect this to have the IPSec VPN client receive an IP address, DNS and WINS information from the Zyxel Device.
IP Address Pool Selectan address object from the drop-down list box.
First DNS Server (Optional)The Domain Name System (DNS) maps a domain name to an IP address and vice versa. The Zyxel Device uses these (in the order you specify here) to resolve domain names for VPN. Enter a DNS server's IP address.
Second DNS Server (Optional)Enter a secondary DNS server's IP address that is checked if the first one is unavailable.
First WINS Server (Optional)Type the IP address of the WINS (Windows Internet Naming Service) server that you want to send to the DHCP clients. The WINS server keeps a mapping table of the computer names on your network and the IP addresses that they are currently using.
Second WINS Server (Optional)Enter a secondary WINS server's IP address that is checked if the first one is unavailable.
Configuration PayloadThis is only available when you have created an IKEv2 Gateway and are usingRemote Access (Server Role).
Enable Configuration PayloadSelect this to have at least have the IP address pool included in the VPN setup data.
IP Address Pool: Selectan address object from the drop-down list box.
First DNS Server (optional)The Domain Name System (DNS) maps a domain name to an IP address and vice versa. The Zyxel Device uses these (in the order you specify here) to resolve domain names for VPN. Enter a DNS server's IP address.
Second DNS Server (Optional)Enter a secondary DNS server's IP address that is checked if the first one is unavailable.
First WINS Server (Optional)Type the IP address of the WINS (Windows Internet Naming Service) server that you want to send to the DHCP clients. The WINS server keeps a mapping table of the computer names on your network and the IP addresses that they are currently using.
Second WINS Server (Optional)Enter a secondary WINS server's IP address that is checked if the first one is unavailable.
Phase 2 Settings
SA Life TimeType the maximum number of seconds the IPSec SA can last. Shorter life times provide better security. The Zyxel Device automatically negotiates a new IPSec SA before the current one expires, if there are users who are accessing remote resources.
Active Protocol Select which protocol you want to use in the IPSec SA. Choices are:AH (RFC 2402) - provides integrity, authentication, sequence integrity (replay resistance), and non-repudiation but not encryption. If you select AH, you must select an Authentication algorithm.ESP (RFC 2406) - provides encryption and the same services offered by AH, but its authentication is weaker. If you select ESP, you must select an Encryption algorithm and Authentication algorithm.Both AH and ESP increase processing requirements and latency (delay).The Zyxel Device and remote IPSec router must use the same active protocol.
Encapsulation Select which type of encapsulation the IPSec SA uses. Choices areTunnel - this mode encrypts the IP header information and the data.Transport - this mode only encrypts the data.The Zyxel Device and remote IPSec router must use the same encapsulation.
ProposalUse this section to manage the encryption algorithm and authentication algorithm pairs the Zyxel Device accepts from the remote IPSec router for negotiating the IPSec SA.
Add Click this to create a new entry.
Edit Select an entry and click this to be able to modify it.
Remove Select an entry and click this to delete it.
# This field is a sequential value, and it is not associated with a specific proposal. The sequence of proposals should not affect performance significantly.
EncryptionThis field is applicable when theActive Protocolis ESP. Select which key size and encryption algorithm to use in the IPSec SA. Choices are:NULL - no encryption key or algorithmDES - a 56-bit key with the DES encryption algorithm3DES - a 168-bit key with the DES encryption algorithmAES128 - a 128-bit key with the AES encryption algorithmAES192 - a 192-bit key with the AES encryption algorithmAES256 - a 256-bit key with the AES encryption algorithmThe Zyxel Device and the remote IPSec router must both have at least one proposal that uses use the same encryption and the same key.Longer keys are more secure, but require more processing power, resulting in increased latency and decreased throughput.
AuthenticationSelect which hash algorithm to use to authenticate packet data in the IPSec SA. Choices areSHA1, SHA256, SHA512andMD5. SHA is generally considered stronger than MD5, but it is also slower.The Zyxel Device and the remote IPSec router must both have a proposal that uses the same authentication algorithm.
Perfect Forward Secrecy (PFS)Select whether or not you want to enable Perfect Forward Secrecy (PFS) and, if you do, which Diffie-Hellman key group to use for encryption. Choices are:none - disable PFSDH1 - enable PFS and use a 768-bit random numberDH2 - enable PFS and use a 1024-bit random numberDH5 - enable PFS and use a 1536-bit random numberDH14 - enable PFS and use a 2048 bit random numberPFS changes the root key that is used to generate encryption keys for each IPSec SA. The longer the key, the more secure the encryption, but also the longer it takes to encrypt and decrypt information. Both routers must use the same DH key group.PFS is ignored in initial IKEv2 authentication but is used when re-authenticating.
Related Settings
ZoneSelect the security zone into which to add this VPN connection policy. Any security rules or settings configured for the selected zone apply to this VPN connection policy.
Connectivity CheckThe Zyxel Device can regularly check the VPN connection to the gateway you specified to make sure it is still available.
Enable Connectivity CheckSelect this to turn on the VPN connection check.
Check MethodSelect how the Zyxel Device checks the connection. The peer must be configured to respond to the method you select.Selecticmpto have the Zyxel Device regularly ping the address you specify to make sure traffic can still go through the connection. You may need to configure the peer to respond to pings.Selecttcpto have the Zyxel Device regularly perform a TCP handshake with the address you specify to make sure traffic can still go through the connection. You may need to configure the peer to accept the TCP connection.
Check PortThis field displays when you set the Check Method to tcp. Specify the port number to use for a TCP connectivity check.
Check PeriodEnter the number of seconds between connection check attempts.
Check TimeoutEnter the number of seconds to wait for a response before the attempt is a failure.
Check Fail ToleranceEnter the number of consecutive failures allowed before the Zyxel Device disconnects the VPN tunnel. The Zyxel Device resumes using the first peer gateway address when the VPN connection passes the connectivity check.
Check this AddressSelect this to specify a domain name or IP address for the connectivity check. Enter that domain name or IP address in the field next to it.
Check the First and Last IP Address in the Remote PolicySelect this to have the Zyxel Device check the connection to the first and last IP addresses in the connection's remote policy. Make sure one of these is the peer gateway's LAN IP address.
LogSelect this to have the Zyxel Device generate a log every time it checks this VPN connection.
Inbound/Outbound traffic NAT
Outbound Traffic
Source NATThis translation hides the source address of computers in the local network. It may also be necessary if you want the Zyxel Device to route packets from computers outside the local network through the IPSec SA.
SourceSelect the address object that represents the original source address (or select Create Object to configure a new one). This is the address object for the computer or network outside the local network. The size of the original source address range (Source) must be equal to the size of the translated source address range (SNAT).
DestinationSelect the address object that represents the original destination address (or select Create Object to configure a new one). This is the address object for the remote network.
SNATSelect the address object that represents the translated source address (or select Create Object to configure a new one). This is the address object for the local network. The size of the original source address range (Source) must be equal to the size of the translated source address range (SNAT).
Inbound Traffic
Source NAT This translation hides the source address of computers in the remote network.
SourceSelect the address object that represents the original source address (or select Create Object to configure a new one). This is the address object for the remote network. The size of the original source address range (Source) must be equal to the size of the translated source address range (SNAT).
DestinationSelect the address object that represents the original destination address (or select Create Object to configure a new one). This is the address object for the local network.
SNATSelect the address object that represents the translated source address (or select Create Object to configure a new one). This is the address that hides the original source address. The size of the original source address range (Source) must be equal to the size of the translated source address range (SNAT).
Destination NATThis translation forwards packets (for example, mail) from the remote network to a specific computer (for example, the mail server) in the local network.
AddClick this to create a new entry. Select an entry and click Add to create a new entry after the selected entry.
Edit Select an entry and click this to be able to modify it.
Remove Select an entry and click this to delete it.
MoveTo change an entry's position in the numbered list, select it and clickMoveto display a field to type a number for where you want to put that entry and press [ENTER] to move the entry to the number that you typed.
# This field is a sequential value, and it is not associated with a specific NAT record.However, the order of records is the sequence in which conditions are checked and executed.
Original IPSelect the address object that represents the original destination address. This is the address object for the remote network.
Mapped IPSelect the address object that represents the desired destination address. For example, this is the address object for the mail server.
ProtocolSelect the protocol required to use this translation. Choices are:TCP, UDP, or All.
Original Port Start / Original Port EndThese fields are available if the protocol isTCPorUDP.Enter the original destination port or range of original destination ports. The size of the original port range must be the same size as the size of the mapped port range.
Mapped Port Start / Mapped Port EndThese fields are available if the protocol isTCPorUDP.Enter the translated destination port or range of translated destination ports. The size of the original port range must be the same size as the size of the mapped port range.
OK Click OK to save the changes.
CancelClick Cancelto discard all changes and return to the main VPN screen.

19.3 The VPN Gateway Screen

The VPN Gateway summary screen displays the IPSec VPN gateway policies in the Zyxel Device, as well as the Zyxel Device's address, remote IPSec router's address, and associated VPN connections for each one. In addition, it also lets you activate and deactivate each VPN gateway. To access this screen, click Configuration >VPN >Network >IPSec VPN >VPN Gateway. The following screen appears.

Figure 300 Configuration > VPN > IPSec VPN > VPN Gateway
VPN Connection VPN Gateway Concentrator Configuration Provisioning IPv4 Configuration Add Edit Remove Activate Inactivate References Status Name My Address Secure Gateway VPN Connection IKE V... 1 WIZ_VPN wan1 0.0.0.0 WIZ_VPN IKEv2 2 WIZ_VPN_PROVISIONING wan1 0.0.0.0 WIZ_VPN_PROVISIONING IKEv2 3 Test wan1 0.0.0.0 Test IKEv1 4 WIZ_L2TP_VPN wan1 0.0.0.0 WIZ_L2TP_VPN IKEv1 Page 1 of 1 Show 50 Items Displaying 1 - 4 of 4 IPv6 Configuration Add Edit Remove Activate Inactivate References Status Name My Address Secure Gateway VPN Connection Page 0 of 0 Show 50 Items No data to display Apply Reset

Each field is discussed in the following table. See Section 19.3.1 on page 433 for more information.

Table 169 Configuration > VPN > IPSec VPN > VPN Gateway

LABEL DESCRIPTION
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry. See Section 9.4.4 on page 255 for an example.
# This field is a sequential value, and it is not associated with a specific VPN gateway.
StatusThe activate (light bulb) icon is lit when the entry is active and dimmed when the entry is inactive.
Name This field displays the name of the VPN gateway
My addressThis field displays the interface or a domain name the Zyxel Device uses for the VPN gateway.
Secure GatewayThis field displays the IP address(es) of the remote IPSec routers.
VPN Connection This field displays VPN connections that use this VPN gateway.
IKE VersionThis field displays whether the gateway is using IKEv1 or IKEv2. IKEv1 applies to IPv4 traffic only. IKEv2 applies to both IPv4 and IPv6 traffic. IKE (Internet Key Exchange) is a protocol used in setting up security associations that allows two parties to send data securely. See Section 19.1 on page 418 for more information on IKEv1 and IKEv2.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

19.3.1 The VPN Gateway Add/Edit Screen

The VPN Gateway Add/Edit screen allows you to create a new VPN gateway policy or edit an existing one. To access this screen, go to the VPN Gateway summary screen (see Section 19.3 on page 432), and click either the Add icon or an Edit icon.

Figure 301 Configuration > VPN > IPSec VPN > VPN Gateway > Add/Edit
Add VPN Gateway Hide Advanced Settings Create new Object▼ General Settings Enable VPN Gateway Name: IKE Version IKEv1 IKEv2 Gateway Settings My Address Interface wan1 DHCP client - 172.21.40.13/255.255.252.0 Domain Name / IPv4 Peer Gateway Address Static Address Primary 0.0.0.0 Secondary 0.0.0.0 Fall back to Primary Peer Gateway when possible Fall Back Check Interval: 300 (60-86400 seconds) Dynamic Address Authentication Pre-Shared Key: unmasked Certificate default (See My Certificates) User Based PSK admin Advance Local ID Type: IPv4 Content: 0.0.0.0 Peer ID Type: Any Content: Phase 1 Settings SA Life Time: 86400 (180 - 3000000 Seconds) Negotiation Mode: Aggressive Advance Proposal Add Edit Remove Encryption Authentication 1 AES128 SHA1 Key Group: DH2 NAT Traversal Dead Peer Detection (DPD) X-Auth Enable Extended Authentication Server Mode AAA Method: default Allowed User: any Client Mode User Name : Password: Retype to Confirm: OK Cancel

Each field is described in the following table.

Table 170 Configuration > VPN > IPSec VPN > VPN Gateway > Add/Edit

LABEL DESCRIPTION
Show Advanced Settings / Hide Advanced SettingsClick this button to display a greater or lesser number of configuration fields.
Create New ObjectUse to configure any new settings objects that you need to use in this screen.
General Settings
Enable Select this to activate the VPN Gateway policy.
VPN Gateway NameType the name used to identify this VPN gateway. You may use 1-31 alphanumeric characters, underscores( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive.
IKE Version
IKEv1 / IKEv2Select IKEv1 or IKEv2. IKEv1 applies to IPv4 traffic only. IKEv2 applies to both IPv4 and IPv6 traffic. IKE (Internet Key Exchange) is a protocol used in setting up security associations that allows two parties to send data securely. See Section 19.1 on page 418 for more information on IKEv1 and IKEv2.
Gateway Settings
My Address Select how the IP address of the Zyxel Device in the IKE SA is defined.If you select Interface, select the Ethernet interface, VLAN interface, virtual Ethernet interface, virtual VLAN interface or PPPoE/PPTP interface. The IP address of the Zyxel Device in the IKE SA is the IP address of the interface.If you select Domain Name / IP, enter the domain name or the IP address of the Zyxel Device. The IP address of the Zyxel Device in the IKE SA is the specified IP address or the IP address corresponding to the domain name. 0.0.0.0 is not generally recommended as it has the Zyxel Device accept IPSec requests destined for any interface address on the Zyxel Device.
Peer Gateway AddressSelect how the IP address of the remote IPSec router in the IKE SA is defined.Select Static Address to enter the domain name or the IP address of the remote IPSec router. You can provide a second IP address or domain name for the Zyxel Device to try if it cannot establish an IKE SA with the first one.Fall back to Primary Peer Gateway when possible: When you select this, if the connection to the primary address goes down and the Zyxel Device changes to using the secondary connection, the Zyxel Device will reconnect to the primary address when it becomes available again and stop using the secondary connection. Users will lose their VPN connection briefly while the Zyxel Device changes back to the primary connection. To use this, the peer device at the secondary address cannot be set to use a nailed-up VPN connection. In the Fallback Check Interval field, set how often to check if the primary address is available.Select Dynamic Address if the remote IPSec router has a dynamic IP address (and does not use DDNS).
AuthenticationNote: The Zyxel Device and remote IPSec router must use the same authentication method to establish the IKE SA.
Pre-Shared KeySelect this to have the Zyxel Device and remote IPSec router use a pre-shared key (password) of up to 128 characters to identify each other when they negotiate the IKE SA. Type the pre-shared key in the field to the right. The pre-shared key can be: · alphanumeric characters or ,:. | `!@#$%^&*()_+\.'::/<>=." · pairs of hexadecimal (0-9, A-F) characters, preceded by "0x".Type "0x" at the beginning of a hexadecimal key. For example, "0x0123456789ABCDEF" is in hexadecimal format; "0123456789ABCDEF" is in ASCII format. If you use hexadecimal, you must enter twice as many characters since you need to enter pairs.The Zyxel Device and remote IPSec router must use the same pre-shared key.Select unmasked to see the pre-shared key in readable plain text.
CertificateSelect this to have the Zyxel Device and remote IPSec router use certificates to authenticate each other when they negotiate the IKE SA. Then select the certificate the Zyxel Device uses to identify itself to the remote IPSec router.This certificate is one of the certificates in My Certificates. If this certificate is self-signed, import it into the remote IPsec router. If this certificate is signed by a CA, the remote IPsec router must trust that CA.Note: The IPSec routers must trust each other's certificates.The Zyxel Device uses one of its Trusted Certificates to authenticate the remote IPSec router's certificate. The trusted certificate can be a self-signed certificate or that of a trusted CA that signed the remote IPSec router's certificate.
User-based PSKUser-based PSK (IKEv1 only) generates and manages separate pre-shared keys for every user. This enables multiple users, each with a unique key, to access the same VPN gateway policy with one-to-one authentication and strong encryption. Access can be denied on a per-user basis thus allowing VPN SA user-based policies. Click User-Based PSK then select a user or group object who is allowed VPN SA access using this VPN gateway policy. This is for IKEv1 only.
Local ID TypeThis field is read-only if the Zyxel Device and remote IPSec router use certificates to identify each other. Select which type of identification is used to identify the Zyxel Device during authentication. Choices are:IPv4 or IPv6 - the Zyxel Device is identified by an IP addressDNS - the Zyxel Device is identified by a domain nameE-mail - the Zyxel Device is identified by the string specified in this field
ContentThis field is read-only if the Zyxel Device and remote IPSec router use certificates to identify each other. Type the identity of the Zyxel Device during authentication. The identity depends on the Local ID Type.IP - type an IP address; if you type 0.0.0.0, the Zyxel Device uses the IP address specified in the My Address field. This is not recommended in the following situations:· There is a NAT router between the Zyxel Device and remote IPSec router.· You want the remote IPSec router to be able to distinguish between IPSec SA requests that come from IPSec routers with dynamic WAN IP addresses.In these situations, use a different IP address, or use a different Local ID Type.DNS - type the fully qualified domain name (FQDN). This value is only used for identification and can be any string that matches the peer ID string.E-mail - the Zyxel Device is identified by the string you specify here; you can use up to 63 ASCII characters including spaces, although trailing spaces are truncated. This value is only used for identification and can be any string.
Peer ID TypeSelect which type of identification is used to identify the remote IPSec router during authentication. Choices are:IP - the remote IPSec router is identified by an IP addressDNS - the remote IPSec router is identified by a domain nameE-mail - the remote IPSec router is identified by the string specified in this fieldAny - the Zyxel Device does not check the identity of the remote IPSec routerIf the Zyxel Device and remote IPSec router use certificates, there is one more choice.Subject Name - the remote IPSec router is identified by the subject name in the certificate
ContentThis field is disabled if the Peer ID Type is Any. Type the identity of the remote IPSec router during authentication. The identity depends on the Peer ID Type.If the Zyxel Device and remote IPSec router do not use certificates.IP - type an IP address; see the note at the end of this description.DNS - type the fully qualified domain name (FQDN). This value is only used for identification and can be any string that matches the peer ID string.E-mail - the remote IPSec router is identified by the string you specify here; you can use up to 31 ASCII characters including spaces, although trailing spaces are truncated. This value is only used for identification and can be any string.If the Zyxel Device and remote IPSec router use certificates, type the following fields from the certificate used by the remote IPSec router.IP - subject alternative name field; see the note at the end of this description.DNS - subject alternative name fieldE-mail - subject alternative name fieldSubject Name - subject name (maximum 255 ASCII characters, including spaces)Note: If Peer ID Type is IP, please read the rest of this section.If you type 0.0.0.0, the Zyxel Device uses the IP address specified in the Secure Gateway Address field. This is not recommended in the following situations:There is a NAT router between the Zyxel Device and remote IPSec router.You want the remote IPSec router to be able to distinguish between IPSec SA requests that come from IPSec routers with dynamic WAN IP addresses.In these situations, use a different IP address, or use a different Peer ID Type.
Phase 1 Settings
SA Life Time (Seconds)Type the maximum number of seconds the IKE SA can last. When this time has passed, the Zyxel Device and remote IPSec router have to update the encryption and authentication keys and re-negotiate the IKE SA. This does not affect any existing IPSec SAs, however.
Negotiation ModeSelect the negotiation mode to use to negotiate the IKE SA. Choices areMain - this encrypts the Zyxel Device's and remote IPSec router's identities but takes more time to establish the IKE SAAggressive - this is faster but does not encrypt the identitiesThe Zyxel Device and the remote IPSec router must use the same negotiation mode.
ProposalUse this section to manage the encryption algorithm and authentication algorithm pairs the Zyxel Device accepts from the remote IPSec router for negotiating the IKE SA.
Add Click this to create a new entry.
Edit Select an entryand click this to be able to modify it.
Remove Select an entry and click this to delete it.
# This field is a sequential value, and it is not associated with a specific proposal. The sequence of proposals should not affect performance significantly.
EncryptionSelect which key size and encryption algorithm to use in the IKE SA. Choices are:DES- a 56-bit key with the DES encryption algorithm3DES- a 168-bit key with the DES encryption algorithmAES128- a 128-bit key with the AES encryption algorithmAES192- a 192-bit key with the AES encryption algorithmAES256- a 256-bit key with the AES encryption algorithmThe Zyxel Device and the remote IPSec router must use the same key size and encryption algorithm. Longer keys require more processing power, resulting in increased latency and decreased throughput.
AuthenticationSelect which hash algorithm to use to authenticate packet data in the IPSec SA. Choices are SHA1, SHA256, SHA512 and MD5. SHA is generally considered stronger than MD5, but it is also slower.The remote IPSec router must use the same authentication algorithm.
Key GroupSelect which Diffie-Hellman key group (DHx) you want to use for encryption keys. Choices are:DH1- use a 768-bit random numberDH2- use a 1024-bit random numberDH5- use a 1536-bit random numberDH14- use a 2048 bit random numberThe longer the key, the more secure the encryption, but also the longer it takes to encrypt and decrypt information. Both routers must use the same DH key group.
NAT Traversal Select this if any of these conditions are satisfied.This IKE SA might be used to negotiate IPSec SAs that use ESP as the active protocol.There are one or more NAT routers between the Zyxel Device and remote IPSec router, and these routers do not support IPSec pass-thru or a similar feature.The remote IPSec router must also enable NAT traversal, and the NAT routers have to forward packets with UDP port 500 and UDP 4500 headers unchanged.This field applies for IKEv1 only. NAT Traversal is always performed when you use IKEv2.
Dead Peer Detection (DPD)Select this check box if you want the Zyxel Device to make sure the remote IPSec router is there before it transmits data through the IKE SA. The remote IPSec router must support DPD. If there has been no traffic for at least 15 seconds, the Zyxel Device sends a message to the remote IPSec router. If the remote IPSec router responds, the Zyxel Device transmits the data. If the remote IPSec router does not respond, the Zyxel Device shuts down the IKE SA.If the remote IPSec router does not support DPD, see if you can use the VPN connection connectivity check (see Section 19.2.1 on page 425).This field applies for IKEv1 only. Dead Peer Detection (DPD) is always performed when you use IKEv2.
X Auth / Extended Authentication ProtocolThis part of the screen displays X-Auth when using IKEv1 and Extended Authentication Protocol when using IKEv2.
X-AuthThis displays when using IKEv1. When different users use the same VPN tunnel to connect to the Zyxel Device (telecommuters sharing a tunnel for example), use X-auth to enforce a user name and password check. This way even though telecommuters all know the VPN tunnel's security settings, each still has to provide a unique user name and password.
Enable Extended AuthenticationSelect this if one of the routers (the Zyxel Device or the remote IPSec router) verifies a user name and password from the other router using the local user database and/or an external server.
Server ModeSelect this if the Zyxel Device authenticates the user name and password from the remote IPSec router. You also have to select the authentication method, which specifies how the Zyxel Device authenticates this information.
AAA MethodSelect the authentication method, which specifies how the Zyxel Device authenticates this information.
Allowed UserExtended authentication now supports an allowed user. Select what users should be authenticated.
Client ModeSelect this radio button if the Zyxel Device provides a username and password to the remote IPSec router for authentication. You also have to provide theUser Nameand the Password.
User NameThis field is required if the Zyxel Device is inClient Modefor extended authentication. Type the user name the Zyxel Device sends to the remote IPSec router. The user name can be 1-31 ASCII characters. It is case-sensitive, but spaces are not allowed.
PasswordThis field is required if the Zyxel Device is inClient Modefor extended authentication. Type the password the Zyxel Device sends to the remote IPSec router. The password can be 1-31 ASCII characters. It is case-sensitive, but spaces are not allowed.
Retype to ConfirmType the exact same password again here to make sure an error was not made when typing it originally.
Extended Authentication ProtocolThis displays when usingIKEv2.EAP uses a certificate for authentication.
Enable Extended Authentication ProtocolSelect this if one of the routers (the Zyxel Device or the remote IPSec router) verifies a user name and password from the other router using the local user database and/or an external server or a certificate.
Allowed Auth MethodThis field displays the authentication method that is used to authenticate the users.
Server ModeSelect this if the Zyxel Device authenticates the user name and password from the remote IPSec router. You also have to select an AAA method, which specifies how the Zyxel Device authenticates this information and who may be authenticated(Allowed User).
Client ModeSelect this radio button if the Zyxel Device provides a username and password to the remote IPSec router for authentication. You also have to provide theUser Nameand the Password.
User NameThis field is required if the Zyxel Device is inClient Modefor extended authentication. Type the user name the Zyxel Device sends to the remote IPSec router. The user name can be 1-31 ASCII characters. It is case-sensitive, but spaces are not allowed.
PasswordThis field is required if the Zyxel Device is inClient Modefor extended authentication. Type the password the Zyxel Device sends to the remote IPSec router. The password can be 1-31 ASCII characters. It is case-sensitive, but spaces are not allowed.
Retype to ConfirmType the exact same password again here to make sure an error was not made when typing it originally.

19.4 VPN Concentrator

A VPN concentrator combines several IPSec VPN connections into one secure network.

Figure 302 VPN Topologies (Fully Meshed and Hub and Spoke)
ZYXEL USGFLEX700-GB0101F - VPN Concentrator - 1

In a fully-meshed VPN topology (1 in the figure), there is a VPN connection between every pair of routers. In a hub-and-spoke VPN topology (2 in the figure), there is a VPN connection between each spoke router (B, C, D, and E) and the hub router (A), which uses the VPN concentrator. The VPN concentrator routes VPN traffic between the spoke routers and itself.

A VPN concentrator reduces the number of VPN connections that you have to set up and maintain on the network. You might also be able to consolidate the policy routes in each spoke router, depending on the IP addresses and subnets of each spoke.

However a VPN concentrator is not for every situation. The hub router is a single failure point, so a VPN concentrator is not as appropriate if the connection between spoke routers cannot be down occasionally (maintenance, for example). There is also more burden on the hub router. It receives VPN traffic from one spoke, decrypts it, inspects it to find out to which spoke to route it, encrypts it, and sends it to the appropriate spoke. Therefore, a VPN concentrator is more suitable when there is a minimum amount of traffic between spoke routers.

19.4.1 VPN Concentrator Requirements and Suggestions

Consider the following when using the VPN concentrator.

  • The local IP addresses configured in the VPN rules should not overlap.
  • The concentrator must have at least one separate VPN rule for each spoke. In the local policy, specify the IP addresses of the networks with which the spoke is to be able to have a VPN tunnel. This may require you to use more than one VPN rule for each spoke.
  • To have all Internet access from the spoke routers go through the VPN tunnel, set the VPN rules in the spoke routers to use 0.0.0.0 (any) as the remote IP address.
  • Your security policies can still block VPN packets.

19.4.2 VPN Concentrator Screen

The VPN Concentrator summary screen displays the VPN concentrators in the Zyxel Device. To access this screen, click Configuration > VPN > IPSec VPN > Concentrator.

Figure 303 Configuration > VPN > IPSec VPN > Concentrator
VPN Connection VPN Gateway Concentrator Configuration Provisioning IPv4 Configuration + Add Edit Remove Name Group Members ◀ Page 0 of 0 ▶ Show 50 items No data to display IPv6 Configuration + Add Edit Remove Name Group Members ◀ Page 0 of 0 ▶ Show 50 items No data to display

Each field is discussed in the following table. See Section 19.4.3 on page 441 for more information.

Table 171 Configuration > VPN > IPSec VPN > Concentrator

LABEL DESCRIPTION
IPv4/IPv6ConfigurationChoose to configure for IPv4 or IPv6 traffic.
Add Click this to create a new entry.
EditSelect an entry and click this to be able to modify it.
Remove Select an entry and click this to delete it.
#This field is a sequential value, and it is not associated with a specific concentrator.
Name This field displays the name of the VPN concentrator.
Group MembersThese are the VPN connection policies that are part of the VPN concentrator.

19.4.3 The VPN Concentrator Add/Edit Screen

Use the VPN Concentrator Add/Edit screen to create or edit a VPN concentrator. To access this screen, go to the VPN Concentrator summary screen (see Section 19.4 on page 440), and click either the Add icon or an Edit icon.

Figure 304 Configuration > VPN > IPSec VPN > Concentrator > Add/Edit
Add VPN Concentrator Name: Available Member OK Cancel

Each field is described in the following table.

Table 172 VPN > IPSec VPN > Concentrator > Add/Edit

LABEL DESCRIPTION
NameEnter the name of the concentrator. You may use 1-31 alphanumeric characters, underscores( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive.
MemberSelect the concentrator's IPSec VPN connection policies.Note: You must disable policy enforcement in each member. See Section 19.2.1 on page 425.IPSec VPN connection policies that do not belong to a VPN concentrator appear under Available.Select any VPN connection policies that you want to add to the VPN concentrator and click the right arrow button to add them.The VPN concentrator's member VPN connections appear under Member. Select any VPN connections that you want to remove from the VPN concentrator, and click the left arrow button to remove them.
OKClick OK to save your changes in the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

19.5 Zyxel Device IPSec VPN Client Configuration Provisioning

Use the Configuration > VPN > IPSec VPN > Configuration Provisioning screen to configure who can retrieve VPN rule settings from the Zyxel Device using the Zyxel Device IPSec VPN Client. In the Zyxel Device IPSec VPN Client, you just need to enter the IP address of the Zyxel Device to get all the VPN rule settings automatically. You do not need to manually configure all rule settings in the Zyxel Device IPSec VPN client.

VPN rules for the Zyxel Device IPSec VPN Client have certain restrictions. They must not contain the following settings:

  • AH active protocol
  • NULL encryption
    • SHA512 authentication

• A subnet or range remote policy

The following VPN Gateway rules configured on the Zyxel Device cannot be provisioned to the IPSec VPN Client:

• IPv4 rules with IKEv2 version
- IPv4 rules with User-based PSK authentication

Note: You must enable IPv6 in System > IPv6 to activate IPv6 VPN tunneling rules.

In the Zyxel Device Quick Setup wizard, you can use the VPN Settings for Configuration Provisioning wizard to create a VPN rule that will not violate these restrictions.

Figure 305 Configuration > VPN > IPSec VPN > Configuration Provisioning
VPN Connection VPN Gateway Concentrator Configuration Provisioning General Settings Enable Configuration Provisioning Authentication Client Authentication Method: default Configuration Add Edit Remove Activate Inactivate Move SI... Priority VPN Connection Allowed User Type Page 0 of 0 Show 50 Items No data to display Apply Reset

Each field is discussed in the following table.

Table 173 Configuration > VPN > IPSec VPN > Configuration Provisioning

LABEL DESCRIPTION
Enable Configuration ProvisioningSelect this for users to be able to retrieve VPN rule settings using the Zyxel Device IPSec VPN client.
Client Authentication MethodChoose how users should be authenticated. They can be authenticated using the local database on the Zyxel Device or an external authentication database such as LDAP, Active Directory or RADIUS.defaultis a method you configured inObject > Auth Method.You may configure multiple methods there. If you choose the local database on the Zyxel Device, then configure users using theObject > User/Groupscreen. If you choose LDAP, Active Directory or RADIUS authentication servers, then configure users on the respective server.
ConfigurationWhen you add or edit a configuration provisioning entry, you are allowed to set theVPN Connectionand Allowed Userfields.Duplicate entries are not allowed. You cannot select the sameVPN Connectionand Allowed Userpair in a new entry if the same pair exists in a previous entry.You can bind different rules to the same user, but the Zyxel Device will only allow VPN rule setting retrieval for the first match found.
AddClick Add to bind a configured VPN rule to a user or group. Only that user or group may then retrieve the specified VPN rule settings.If you click Add without selecting an entry in advance then the new entry appears as the first entry. Entry order is important as the Zyxel Device searches entries in the order listed here to find a match. After a match is found, the Zyxel Device stops searching. If you want to add an entry as number three for example, then first select entry 2 and click Add. To reorder an entry, use Move.
EditSelect an existing entry and click Edit to change its settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ActivateTo turn on an entry, select it and click Activate. Make sure that Enable Configuration Provisioning is also selected.
InactivateTo turn off an entry, select it and click Inactivate.
MoveUse Move to reorder a selected entry. Select an entry, click Move, type the number where the entry should be moved, press, then click Apply.
StatusThis icon shows if the entry is active (yellow) or not (gray). VPN rule settings can only be retrieved when the entry is activated (and Enable Configuration Provisioning is also selected).
PriorityPriority shows the order of the entry in the list. Entry order is important as the Zyxel Device searches entries in the order listed here to find a match. After a match is found the Zyxel Device stops searching.
VPN ConnectionThis field shows all configured VPN rules that match the rule criteria for the Zyxel Device IPSec VPN client. Select a rule to bind to the associated user or group.
Allowed UserSelect which user or group of users is allowed to retrieve the associated VPN rule settings using the Zyxel Device IPSec VPN client. A user may belong to a number of groups. If entries are configured for different groups, the Zyxel Device will allow VPN rule setting retrieval based on the first match found.Users of type admin or limited-admin are not allowed.
TypeThis field shows how traffic is tunneled from the Zyxel Device to the Zyxel VPN client:6in4 (tunnel IPv6 traffic from the Zyxel Device to the Zyxel client in an IPv4 network);4in6 (tunnel IPv4 traffic from the Zyxel Device to the Zyxel VPN client in an IPv6 network);4in4 (tunnel IPv4 traffic from the Zyxel Device to the Zyxel VPN client in an IPv4 network).
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

19.6 IPSec VPN Background Information

Here is some more detailed IPSec VPN background information.

IKE SA Overview

The IKE SA provides a secure connection between the Zyxel Device and remote IPSec router.

It takes several steps to establish an IKE SA. The negotiation mode determines how many. There are two negotiation modes--main mode and aggressive mode. Main mode provides better security, while aggressive mode is faster.

Note: Both routers must use the same negotiation mode.

These modes are discussed in more detail in Negotiation Mode. Main mode is used in various examples in the rest of this section.

The Zyxel Device supports IKEv1 and IKEv2. See Section 19.1 on page 418 for more information.

IP Addresses of the Zyxel Device and Remote IPSec Router

To set up an IKE SA, you have to specify the IP addresses of the Zyxel Device and remote IPSec router. You can usually enter a static IP address or a domain name for either or both IP addresses. Sometimes, your Zyxel Device might offer another alternative, such as using the IP address of a port or interface, as well.

You can also specify the IP address of the remote IPSec router as 0.0.0.0. This means that the remote IPSec router can have any IP address. In this case, only the remote IPSec router can initiate an IKE SA because the Zyxel Device does not know the IP address of the remote IPSec router. This is often used for telecommuters.

IKE SA Proposal

The IKE SA proposal is used to identify the encryption algorithm, authentication algorithm, and Diffie-Hellman (DH) key group that the Zyxel Device and remote IPSec router use in the IKE SA. In main mode, this is done in steps 1 and 2, as illustrated next.

Figure 306 IKE SA: Main Negotiation Mode, Steps 1 - 2: IKE SA Proposal

One or more proposals, each one consisting of:

- encryption algorithm

  • authentication algorithm
  • Diffie-Hellman key group

ZYXEL USGFLEX700-GB0101F - IKE SA Proposal - 1

flowchart
graph LR
    A["Red Segment"] -->|1| B["Blue Segment"]
    C["X"] <--_D["2"]
    B --> E["Y"]

The Zyxel Device sends one or more proposals to the remote IPSec router. (In some devices, you can only set up one proposal.) Each proposal consists of an encryption algorithm, authentication algorithm, and DH key group that the Zyxel Device wants to use in the IKE SA. The remote IPSec router selects an acceptable proposal and sends the accepted proposal back to the Zyxel Device. If the remote IPSec router rejects all of the proposals, the Zyxel Device and remote IPSec router cannot establish an IKE SA.

Note: Both routers must use the same encryption algorithm, authentication algorithm, and DH key group.

In most Zyxel Devices, you can select one of the following encryption algorithms for each proposal. The algorithms are listed in order from weakest to strongest.

- Data Encryption Standard (DES) is a widely used method of data encryption. It applies a 56-bit key to each 64-bit block of data.

  • Triple DES (3DES) is a variant of DES. It iterates three times with three separate keys, effectively tripling the strength of DES.
  • Advanced Encryption Standard (AES) is a newer method of data encryption that also uses a secret key. AES applies a 128-bit key to 128-bit blocks of data. It is faster than 3DES.

Some Zyxel Devices also offer stronger forms of AES that apply 192-bit or 256-bit keys to 128-bit blocks of data.

In most Zyxel Devices, you can select one of the following authentication algorithms for each proposal. The algorithms are listed in order from weakest to strongest.

  • MD5 (Message Digest 5) produces a 128-bit digest to authenticate packet data.
  • SHA1 (Secure Hash Algorithm) produces a 160-bit digest to authenticate packet data.
  • SHA256 (Secure Hash Algorithm) produces a 256-bit digest to authenticate packet data.
  • SHA512 (Secure Hash Algorithm) produces a 512-bit digest to authenticate packet data.

See Diffie-Hellman (DH) Key Exchange on page 446 for more information about DH key groups.

Diffie-Hellman (DH) Key Exchange

The Zyxel Device and the remote IPSec router use DH public-key cryptography to establish a shared secret. The shared secret is then used to generate encryption keys for the IKE SA and IPSec SA. In main mode, this is done in steps 3 and 4, as illustrated next.

Figure 307 IKE SA: Main Negotiation Mode, Steps 3 - 4: DH Key Exchange
Diffie-Hellman key exchange
X ... 3 4 Y

DH public-key cryptography is based on DH key groups. Each key group is a fixed number of bits long. The longer the key, the more secure the encryption, but also the longer it takes to encrypt and decrypt information. For example, DH2 keys (1024 bits) are more secure than DH1 keys (768 bits), but DH2 keys take longer to encrypt and decrypt.

Authentication

Before the Zyxel Device and remote IPSec router establish an IKE SA, they have to verify each other's identity. This process is based on pre-shared keys and router identities.

In main mode, the Zyxel Device and remote IPSec router authenticate each other in steps 5 and 6, as illustrated below. The identities are also encrypted using the encryption algorithm and encryption key the Zyxel Device and remote IPSec router selected in previous steps.

Figure 308 IKE SA: Main Negotiation Mode, Steps 5 - 6: Authentication (continued)
ZYXEL USGFLEX700-GB0101F - Authentication - 1

flowchart
graph LR
    subgraph Segment X
        A["Pre-shared Key"] --> B["Zyxel Device Identity"]
        B --> C["ID type"]
        B --> D["- content"]
    end
    subgraph Segment Y
        E["Pre-shared Key"] --> F["Remote IPSec Router Identity"]
        F --> G["ID type"]
        F --> H["- content"]
    end
    A -.->|5| E
    B -.->|6| E

You have to create (and distribute) a pre-shared key. The Zyxel Device and remote IPSec router use it in the authentication process, though it is not actually transmitted or exchanged.

Note: The Zyxel Device and the remote IPSec router must use the same pre-shared key.

Router identity consists of ID type and content. The ID type can be domain name, IP address, or email address, and the content is a (properly-formatted) domain name, IP address, or email address. The content is only used for identification. Any domain name or email address that you enter does not have to actually exist. Similarly, any domain name or IP address that you enter does not have to correspond to the Zyxel Device's or remote IPSec router's properties.

The Zyxel Device and the remote IPSec router have their own identities, so both of them must store two sets of information, one for themselves and one for the other router. Local ID type and content refers to the ID type and content that applies to the router itself, and peer ID type and content refers to the ID type and content that applies to the other router.

Note: The Zyxel Device's local and peer ID type and content must match the remote IPSec router's peer and local ID type and content, respectively.

For example, in the next table, the Zyxel Device and the remote IPSec router authenticate each other successfully. In contrast, in the following table, the Zyxel Device and the remote IPSec router cannot authenticate each other and, therefore, cannot establish an IKE SA.

Table 174 VPN Example: Matching ID Type and Content

ZYXEL DEVICE REMOTE IPSEC ROUTER
Local ID type: E-mail Local ID type: IP
Local ID content: tom@yourcompany.com Local ID content: 1.1.1.2
Peer ID type: IP Peer ID type: E-mail
Peer ID content: 1.1.1.2 Peer ID content: tom@yourcompany.com

Table 175 VPN Example: Mismatching ID Type and Content

ZYXEL DEVICE REMOTE IPSEC ROUTER
Local ID type: E-mail Local ID type: IP
Local ID content: tom@yourcompany.com Local ID content: 1.1.1.2
Peer ID type: IP Peer ID type: E-mail
Peer ID content: 1.1.1.20 Peer ID content: tom@yourcompany.com

It is also possible to configure the Zyxel Device to ignore the identity of the remote IPSec router. In this case, you usually set the peer ID type to Any. This is less secure, so you should only use this if your Zyxel Device provides another way to check the identity of the remote IPSec router (for example, extended authentication) or if you are troubleshooting a VPN tunnel.

Additional Topics for IKE SA

This section provides more information about IKE SA.

Negotiation Mode

There are two negotiation modes--main mode and aggressive mode. Main mode provides better security, while aggressive mode is faster.

Main mode takes six steps to establish an IKE SA.

Steps 1 - 2: The Zyxel Device sends its proposals to the remote IPSec router. The remote IPSec router selects an acceptable proposal and sends it back to the Zyxel Device.

Steps 3 - 4: The Zyxel Device and the remote IPSec router exchange pre-shared keys for authentication and participate in a Diffie-Hellman key exchange, based on the accepted DH key group, to establish a shared secret.

Steps 5 - 6: Finally, the Zyxel Device and the remote IPSec router generate an encryption key (from the shared secret), encrypt their identities, and exchange their encrypted identity information for authentication.

In contrast, aggressive mode only takes three steps to establish an IKE SA. Aggressive mode does not provide as much security because the identity of the Zyxel Device and the identity of the remote IPSec router are not encrypted. It is usually used in remote-access situations, where the address of the initiator is not known by the responder and both parties want to use pre-shared keys for authentication. For example, the remote IPSec router may be a telecommuter who does not have a static IP address.

VPN, NAT, and NAT Traversal

In the following example, there is another router (A) between router X and router Y.

Figure 309 VPN/NAT Example
ZYXEL USGFLEX700-GB0101F - VPN, NAT, and NAT Traversal - 1

flowchart
graph LR
    X[" "] -->|X| A["A"]
    A -->|A| Y["Y"]

If router A does NAT, it might change the IP addresses, port numbers, or both. If router X and router Y try to establish a VPN tunnel, the authentication fails because it depends on this information. The routers cannot establish a VPN tunnel.

Most routers like router A now have an IPSec pass-thru feature. This feature helps router A recognize VPN packets and route them appropriately. If router A has this feature, router X and router Y can establish a VPN tunnel as long as the active protocol is ESP. (See Active Protocol on page 450 for more information about active protocols.)

If router A does not have an IPSec pass-thru or if the active protocol is AH, you can solve this problem by enabling NAT traversal. In NAT traversal, router X and router Y add an extra header to the IKE SA and IPSec SA packets. If you configure router A to forward these packets unchanged, router X and router Y can establish a VPN tunnel.

You have to do the following things to set up NAT traversal.

  • Enable NAT traversal on the Zyxel Device and remote IPSec router.
  • Configure the NAT router to forward packets with the extra header unchanged. (See the field description for detailed information about the extra header.)

The extra header may be UDP port 500 or UDP port 4500, depending on the standard(s) the Zyxel Device and remote IPSec router support.

X-Auth / Extended Authentication

X-Auth / Extended authentication is often used when multiple IPSec routers use the same VPN tunnel to connect to a single IPSec router. For example, this might be used with telecommuters.

In extended authentication, one of the routers (the Zyxel Device or the remote IPSec router) provides a user name and password to the other router, which uses a local user database and/or an external server to verify the user name and password. If the user name or password is wrong, the routers do not establish an IKE SA.

You can set up the Zyxel Device to provide a user name and password to the remote IPSec router, or you can set up the Zyxel Device to check a user name and password that is provided by the remote IPSec router.

If you use extended authentication, it takes four more steps to establish an IKE SA. These steps occur at the end, regardless of the negotiation mode (steps 7-10 in main mode, steps 4-7 in aggressive mode).

Certificates

It is possible for the Zyxel Device and remote IPSec router to authenticate each other with certificates. In this case, you do not have to set up the pre-shared key, local identity, or remote identity because the certificates provide this information instead.

  • Instead of using the pre-shared key, the Zyxel Device and remote IPSec router check the signatures on each other's certificates. Unlike pre-shared keys, the signatures do not have to match.
  • The local and peer ID type and content come from the certificates.

Note: You must set up the certificates for the Zyxel Device and remote IPSec router first.

IPSec SA Overview

Once the Zyxel Device and remote IPSec router have established the IKE SA, they can securely negotiate an IPSec SA through which to send data between computers on the networks.

Note: The IPSec SA stays connected even if the underlying IKE SA is not available anymore.

This section introduces the key components of an IPSec SA.

Local Network and Remote Network

In an IPSec SA, the local network, the one(s) connected to the Zyxel Device, may be called the local policy. Similarly, the remote network, the one(s) connected to the remote IPSec router, may be called the remote policy.

Active Protocol

The active protocol controls the format of each packet. It also specifies how much of each packet is protected by the encryption and authentication algorithms. IPSec VPN includes two active protocols, AH (Authentication Header, RFC 2402) and ESP (Encapsulating Security Payload, RFC 2406).

Note: The Zyxel Device and remote IPSec router must use the same active protocol.

Usually, you should select ESP. AH does not support encryption, and ESP is more suitable with NAT.

Encapsulation

There are two ways to encapsulate packets. Usually, you should use tunnel mode because it is more secure. Transport mode is only used when the IPSec SA is used for communication between the Zyxel Device and remote IPSec router (for example, for remote management), not between computers on the local and remote networks.

Note: The Zyxel Device and remote IPSec router must use the same encapsulation.

These modes are illustrated below.

Figure 310 VPN: Transport and Tunnel Mode Encapsulation

Original Packet

ZYXEL USGFLEX700-GB0101F - Encapsulation - 1

Figure 310 VPN: Transport and Tunnel Mode Encapsulation
Transport Mode Packet IP Header AH/ESP Header TCP Header Data Tunnel Mode Packet IP Header AH/ESP Header IP Header TCP Header Data

In tunnel mode, the Zyxel Device uses the active protocol to encapsulate the entire IP packet. As a result, there are two IP headers:

  • Outside header: The outside IP header contains the IP address of the Zyxel Device or remote IPSec router, whichever is the destination.
  • Inside header: The inside IP header contains the IP address of the computer behind the Zyxel Device or remote IPSec router. The header for the active protocol (AH or ESP) appears between the IP headers.

In transport mode, the encapsulation depends on the active protocol. With AH, the Zyxel Device includes part of the original IP header when it encapsulates the packet. With ESP, however, the Zyxel Device does not include the IP header when it encapsulates the packet, so it is not possible to verify the integrity of the source IP address.

IPSec SA Proposal and Perfect Forward Secrecy

An IPSec SA proposal is similar to an IKE SA proposal (see IKE SA Proposal), except that you also have the choice whether or not the Zyxel Device and remote IPSec router perform a new DH key exchange every time an IPSec SA is established. This is called Perfect Forward Secrecy (PFS).

If you enable PFS, the Zyxel Device and remote IPSec router perform a DH key exchange every time an IPSec SA is established, changing the root key from which encryption keys are generated. As a result, if one encryption key is compromised, other encryption keys remain secure.

If you do not enable PFS, the Zyxel Device and remote IPSec router use the same root key that was generated when the IKE SA was established to generate encryption keys.

The DH key exchange is time-consuming and may be unnecessary for data that does not require such security.

PFS is ignored in initial IKEv2 authentication but is used when re-authenticating.

Additional Topics for IPSec SA

This section provides more information about IPSec SA in your Zyxel Device.

Authentication and the Security Parameter Index (SPI)

For authentication, the Zyxel Device and remote IPSec router use the SPI, instead of pre-shared keys, ID type and content. The SPI is an identification number.

Note: The Zyxel Device and remote IPSec router must use the same SPI.

NAT for Inbound and Outbound Traffic

The Zyxel Device can translate the following types of network addresses in IPSec SA.

  • Source address in outbound packets - this translation is necessary if you want the Zyxel Device to route packets from computers outside the local network through the IPSec SA.
  • Source address in inbound packets - this translation hides the source address of computers in the remote network.
  • Destination address in inbound packets - this translation is used if you want to forward packets (for example, mail) from the remote network to a specific computer (like the mail server) in the local network.

Each kind of translation is explained below. The following example is used to help explain each one.

Figure 311 VPN Example: NAT for Inbound and Outbound Traffic
ZYXEL USGFLEX700-GB0101F - NAT for Inbound and Outbound Traffic - 1

flowchart
graph LR
    subgraph A
        A1["Computer 192.168.2.0/24"] --> X
        X --> Y
        X --> M
    end
    subgraph B
        B1["Computer 192.168.1.0/24"] --> Y
        Y --> M
    end
    X -->|X| Internet
    M -->|M| Internet
    X -->|X| VPN_Tunnel["Internet VPN Tunnel"]
    X -->|X| Node_X
    X -->|X| Node_O

Source Address in Outbound Packets (Outbound Traffic, Source NAT)

This translation lets the Zyxel Device route packets from computers that are not part of the specified local network (local policy) through the IPSec SA. For example, in Figure 311 on page 452, you have to configure this kind of translation if you want computer M to establish a connection with any computer in the remote network (B). If you do not configure it, the remote IPSec router may not route messages for computer M through the IPSec SA because computer M's IP address is not part of its local policy.

To set up this NAT, you have to specify the following information:

  • Source - the original source address; most likely, computer M's network.
  • Destination - the original destination address; the remote network (B).
    • SNAT - the translated source address; the local network (A).

Source Address in Inbound Packets (Inbound Traffic, Source NAT)

You can set up this translation if you want to change the source address of computers in the remote network. To set up this NAT, you have to specify the following information:

  • Source - the original source address; the remote network (B).
  • Destination - the original destination address; the local network (A).
  • SNAT - the translated source address; a different IP address (range of addresses) to hide the original source address.

Destination Address in Inbound Packets (Inbound Traffic, Destination NAT)

You can set up this translation if you want the Zyxel Device to forward some packets from the remote network to a specific computer in the local network. For example, in Figure 311 on page 452, you can configure this kind of translation if you want to forward mail from the remote network to the mail server in the local network (A).

You have to specify one or more rules when you set up this kind of NAT. The Zyxel Device checks these rules similar to the way it checks rules for a security policy. The first part of these rules define the conditions in which the rule apply.

  • Original IP - the original destination address; the remote network (B).
  • Protocol - the protocol [TCP, UDP, or both] used by the service requesting the connection.
  • Original Port - the original destination port or range of destination ports; in Figure 311 on page 452, it might be port 25 for SMTP.

The second part of these rules controls the translation when the condition is satisfied.

  • Mapped IP - the translated destination address; in Figure 311 on page 452, the IP address of the mail server in the local network (A).
  • Mapped Port - the translated destination port or range of destination ports.

The original port range and the mapped port range must be the same size.

IPSec VPN Example Scenario

Here is an example site-to-site IPSec VPN scenario.

Figure 312 Site-to-site IPSec VPN Example
ZYXEL USGFLEX700-GB0101F - IPSec VPN Example Scenario - 1

flowchart
graph LR
    subgraph LAN
        A["Computer 192.168.1.0/24"] --> B["Router X"]
        C["Computer 192.168.1.0/24"] --> D["Router X"]
        E["Computer 192.168.1.0/24"] --> F["Router X"]
        G["Computer 192.168.1.0/24"] --> H["Router X"]
    end

    subgraph Internet
        I["Internet VPN Tunnel"] --> J["Router X"]
        J --> K["Router Y"]
        L["Internet VPN Tunnel"] --> M["Router X"]
        N["Internet VPN Tunnel"] --> O["Router Y"]
        P["Internet VPN Tunnel"] --> Q["Router X"]
        R["Internet VPN Tunnel"] --> S["Router Y"]
        T["Internet VPN Tunnel"] --> U["Router X"]
        V["Internet VPN Tunnel"] --> W["Router Y"]
        X["Internet VPN Tunnel"] --> Y["Router Y"]
    end

    style LAN fill:#f9f,stroke:#333
    style Internet fill:#bbf,stroke:#333

CHAPTER 20 SSL VPN

20.1 Overview

Use SSL VPN to allow users to use a web browser for secure remote user login. The remote users do not need a VPN router or VPN client software.

20.1.1 What You Can Do in this Chapter

  • Use the VPN > SSL VPN > Access Privilege screens (see Section 20.2 on page 455) to configure SSL access policies.
  • Use the Click VPN > SSL VPN > Global Setting screen (see Section 20.3 on page 458) to set the IP address of the Zyxel Device (or a gateway device) on your network for full tunnel mode access, enter access messages or upload a custom logo to be displayed on the remote user screen.

20.1.2 What You Need to Know

Full Tunnel Mode

In full tunnel mode, a virtual connection is created for remote users with private IP addresses in the same subnet as the local network. This allows them to access network resources in the same way as if they were part of the internal network.

Figure 313 Network Access Mode: Full Tunnel Mode
ZYXEL USGFLEX700-GB0101F - Full Tunnel Mode - 1

flowchart
graph LR
    A["User"] -->|https://192.168.1.100| B["Internet"]
    B --> C["LAN (192.168.1.X)"]
    C --> D["Web Mail File Share"]
    C --> E["Non-Web"]
    D --> F["Application Server"]
    E --> F
    F --> G["Web-based Application"]
    G --> H["Back Forward"]
    G --> I["Edit View Fe"]

SSL Access Policy

An SSL access policy allows the Zyxel Device to perform the following tasks:

  • limit user access to specific applications or file sharing server on the network.
  • allow user access to specific networks.
  • assign private IP addresses and provide DNS/WINS server information to remote users to access internal networks.

SSL Access Policy Objects

The SSL access policies reference the following objects. If you update this information, in response to changes, the Zyxel Device automatically propagates the changes through the SSL policies that use the object(s). When you delete an SSL policy, the objects are not removed.

Table 176 Objects

OBJECT TYPEOBJECT SCREENDESCRIPTION
User Accounts User Account/User GroupConfigure a user account or user group to which you want to apply this SSL access policy.
Application SSLApplicationConfigure an SSL application object to specify the type of application and the address of the local computer, server, or web site SSL users are to be able to access.
IP PoolAddressConfigure an address object that defines a range of private IP addresses to assign to user computers so they can access the internal network through a VPN connection.
Server AddressesAddressConfigure address objects for the IP addresses of the DNS and WINS servers that the Zyxel Device sends to the VPN connection users.
VPN NetworkAddressConfigure an address object to specify which network segment users are allowed to access through a VPN connection.

You cannot delete an object that is referenced by an SSL access policy. To delete the object, you must first unassociate the object from the SSL access policy.

20.2 The SSL Access Privilege Screen

Click VPN > SSL VPN to open the Access Privilege screen. This screen lists the configured SSL access policies.

Click on the icons to go to the OneSecurity website where there is guidance on configuration walkthroughs, troubleshooting and other information.

Figure 314 VPN > SSL VPN > Access Privilege
Access Privilege Global Setting Access Policy Summary Configuration Walkthrough Troubleshooting Download VPN Client VPN Note: If you want to use SSL VPN, please make sure user can access HTTPS service. Add Edit Remove Activate Inactivate Move References Status Name User/Group Access Policy Summary Page 0 of 0 Show 50 items No data to display Apply Reset

The following table describes the labels in this screen.

Table 177 VPN > SSL VPN > Access Privilege

LABEL DESCRIPTION
Access Policy SummaryThis screen shows a summary of SSL VPN policies created.Click on the VPN icon to go to the Zyxel VPN Client product page at the Zyxel website.
AddClick this to create a new entry. Select an entry and click Add to create a new entry after the selected entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
MoveTo move an entry to a different number in the list, click the Move icon. In the field that appears, specify the number to which you want to move the interface.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry. Click Refresh to update information on this screen.
# This field displays the index number of the entry.
StatusThis icon is lit when the entry is active and dimmed when the entry is inactive.
NameThis field displays the descriptive name of the SSL access policy for identification purposes.
User/GroupThis field displays the user account or user group name(s) associated to an SSL access policy.This field displays up to three names.
Access Policy SummaryThis field displays details about the SSL application object this policy uses including its name, type, and address.
ApplyClick Apply to save the settings.
ResetClick Reset to discard all changes.

20.2.1 The SSL Access Privilege Policy Add/Edit Screen

To create a new or edit an existing SSL access policy, click the Add or Edit icon in the Access Privilege screen.

Figure 315 VPN > SSL VPN > Add/Edit
Add Access Policy Create new Object Configuration Enable Policy Name: New Zone: none Description: New Create (Optional) User/Group Selectable User/Group Objects === Object === admin ldap-users radius-users cd-users Selected User/Group Objects Network Extension Enable Network Extension (Full Tunnel Mode) Force all client traffic to enter SSL VPN tunnel NetBIOS broadcast over SSL VPN Tunnel Assign IP Pool: DMZ_SUBNET DNS Server 1: none DNS Server 2: none WINS Server 1: none WINS Server 2: none Network List Selectable Address Objects DMZ_SUBNET Example_LOCAL Example_REMOTE IP6to4-Relay LAN1_SUBNET Selected Address Objects Note: Address Objects are what the SSL VPN clients will have access to. OK Cancel

The following table describes the labels in this screen.

Table 178 VPN > SSL VPN > Access Privilege > Add/Edit

LABEL DESCRIPTION
Create new ObjectUse to configure any new settings objects that you need to use in this screen.
Configuration
Enable Policy Selectthis option to activate this SSL access policy.
NameEnter a descriptive name to identify this policy. You can enter up to 31 characters ("a-z", A-Z", "0-9") with no spaces allowed.
ZoneSelect the zone to which to add this SSL access policy. You use zones to apply security settings such as security policy and remote management.
DescriptionEnter additional information about this SSL access policy. You can enter up to 60 characters ("0-9", "a-z", "A-Z", "-" and "_").
User/GroupThe Selectable User/ Group Objects list displays the name(s) of the user account and/or user group(s) to which you have not applied an SSL access policy yet.To associate a user or user group to this SSL access policy, select a user account or user group and click the right arrow button to add to the Selected User/ Group Objects list. You can select more than one name.To remove a user or user group, select the name(s) in the Selected User/ Group Objects list and click the left arrow button.Note: Although you can select admin and limited-admin accounts in this screen, they are reserved for device configuration only. You cannot use them to access the SSL VPN portal.
Network Extension (Optional)
Enable Network ExtensionSelect this option to create a VPN tunnel between the authenticated users and the internal network. This allows the users to access the resources on the network as if they were on the same local network. This includes access to resources not supported by SSL application objects. For example this lets users Telnet to the internal network even though the Zyxel Device does not have SSL application objects for Telnet.Clear this option to disable this feature. Users can only access the applications as defined by the VPN tunnel's selected SSL application settings and the remote user computers are not made to be a part of the local network.
Force all client traffic to SSL VPN tunnelSelect this to send all traffic from the SSL VPN clients through the SSL VPN tunnel. This replaces the default gateway of the SSL VPN clients with the SSL VPN gateway.
NetBIOS broadcast over SSL VPN TunnelSelect this to search for a remote computer and access its applications as if it was in a Local Area Network. The user can find a computer not only by its IP address but also by computer name.
Assign IP PoolDefine a separate pool of IP addresses to assign to the SSL users. Select it here.The SSL VPN IP pool should not overlap with IP addresses on the Zyxel Device's local networks (LAN and DMZ for example), the SSL user's network, or the networks you specify in the SSL VPN Network List.
DNS/WINS Server 1..2Select the name of the DNS or WINS server whose information the Zyxel Device sends to the remote users. This allows them to access devices on the local network using domain names instead of IP addresses.
Network ListTo allow user access to local network(s), select a network name in the Selectable Address Objects list and click the right arrow button to add to the Selected Address Objects list. You can select more than one network.To block access to a network, select the network name in the Selected Address Objects list and click the left arrow button.
OKClick OK to save the changes and return to the main Access Privilege screen.
CancelClick Cancel to discard all changes and return to the main Access Privilege screen.

20.3 The SSL Global Setting Screen

Click VPN > SSL VPN and click the Global Setting tab to display the following screen. Use this screen to set the IP address of the Zyxel Device (or a gateway device) on your network for full tunnel mode access.

Figure 316 VPN > SSL VPN > Global Setting
Access Privilege Global Setting Global Settings Network Extension Local IP: 192.168.200.1 Apply Reset

The following table describes the labels in this screen.

Table 179 VPN > SSL VPN > Global Setting

LABEL DESCRIPTION
Global Setting
Network Extension Local IPSpecify the IP address of the Zyxel Device (or a gateway device) for full tunnel mode SSL VPN access.Leave this field to the default settings unless it conflicts with another interface.
ApplyClickApplyto save the changes and/or start the logo file upload process.
ResetClickResetto return the screen to its last-saved settings.

CHAPTER 21 L2TP VPN

21.1 Overview

L2TP VPN uses the L2TP and IPSec client software included in remote users' Android, iOS, Windows or Mac OS X operating systems for secure connections to the network behind the Zyxel Device. The remote users do not need their own IPSec gateways or third-party VPN client software.

Note:

Figure 317 L2TP VPN Overview
ZYXEL USGFLEX700-GB0101F - Overview - 1

flowchart
graph LR
    A["LAN"] --> B["Z"]
    B --> C["Internet"]
    C --> D["User"]
    style A fill:#cce5ff,stroke:#333
    style B fill:#ffcccc,stroke:#333
    style C fill:#e6f7ff,stroke:#333
    style D fill:#e6f7ff,stroke:#333

21.1.1 What You Can Do in this Chapter

  • Use the L2TP VPN screen (see Section 21.2 on page 461) to configure the Zyxel Device's L2TP VPN settings.
  • Use the VPN Setup Wizard screen in Quick Setup (Chapter 4 on page 79) to configure the Zyxel Device's L2TP VPN settings.

21.1.2 What You Need to Know

The Layer 2 Tunneling Protocol (L2TP) works at layer 2 (the data link layer) to tunnel network traffic between two peers over another network (like the Internet). In L2TP VPN, an IPSec VPN tunnel is established first and then an L2TP tunnel is built inside it. See Chapter 19 on page 418 for information on IPSec VPN.

IPSec Configuration Required for L2TP VPN

You must configure an IPSec VPN connection prior to proper L2TP VPN usage (see Chapter 21 on page 460 for details). The IPSec VPN connection must:

  • Be enabled.
  • Use transport mode.

- Use Pre-Shared Key authentication.

- Use a VPN gateway with the Secure Gateway set to 0.0.0.0 if you need to allow L2TP VPN clients to connect from more than one IP address.

Using the Quick Setup VPN Setup Wizard

The VPN Setup Wizard is an easy and convenient way to configure the L2TP VPN settings. Click Configuration > Quick Setup > VPN Setup > VPN Settings for L2TP VPN Settings to get started.

Policy Route

The Policy Route for return traffic (from LAN to L2TP clients) is automatically created when Zyxel Device adds a new L2TP connection, allowing users access the resources on a network without additional configuration. However, if some of the traffic from the L2TP clients needs to go to the Internet, you will need to create a policy route to send that traffic from the L2TP tunnels out through a WAN trunk. This task can be easily performed by clicking the Allow L2TP traffic through WAN checkbox at Quick Setup >VPN Setup >Allow L2TP traffic through WAN.

Figure 318 Policy Route for L2TP VPN
ZYXEL USGFLEX700-GB0101F - Policy Route - 1

flowchart
graph LR
    A["LAN"] --> B["Z"]
    B --> C["Internet"]
    C --> D["L2TP_POOL"]
    style A fill:#cce5ff,stroke:#333
    style B fill:#ffcccc,stroke:#333
    style C fill:#e6f7ff,stroke:#333
    style D fill:#e6f7ff,stroke:#333

21.2 L2TP VPN Screen

Click Configuration > VPN > L2TP VPN to open the following screen. Use this screen to configure the Zyxel Device's L2TP VPN settings.

Note: Disconnect any existing L2TP VPN sessions before modifying L2TP VPN settings. The remote users must make any needed matching configuration changes and re-establish the sessions using the new settings.

Click on the icons to go to the OneSecurity website where there is guidance on configuration walkthroughs, troubleshooting, and other information.

Figure 319 Configuration > VPN > L2TP VPN
L2TP VPN Hide Advanced Settings Create new Object General Settings Configuration Walkthrough Troubleshooting Enable L2TP Over IPSec VPN Connection: WIZ_L2TP_VPN IP Address Pool: WIZ_L2TP_VPN_IP_ RANGE, 0.0.0.0-0.0.0.0 Authentication Method: default local Advance Authentication Server Certificate: default Allowed User: any Keep Alive Timer: 60 (1-180 seconds) First DNS Server (Optional): Custom Defined Second DNS Server (Optional): Custom Defined First WINS Server (Optional): Second WINS Server (Optional): Apply Reset

The following table describes the fields in this screen.

Table 180 Configuration > VPN > L2TP VPN

LABEL DESCRIPTION
Show Advanced Settings / Hide Advanced SettingsClick this button to display a greater or lesser number of configuration fields.
Create new ObjectUse to configure any new settings objects that you need to use in this screen.
Enable L2TP Over IPSecUse this field to turn the Zyxel Device's L2TP VPN function on or off.
VPN ConnectionSelect the IPSec VPN connection the Zyxel Device uses for L2TP VPN. All of the configured VPN connections display here, but the one you use must meet the requirements listed in IPSec Configuration Required for L2TP VPN.Note: Modifying this VPN connection (or the VPN gateway that it uses) disconnects any existing L2TP VPN sessions.
IP Address PoolSelect the pool of IP addresses that the Zyxel Device uses to assign to the L2TP VPN clients. Use Create new Object if you need to configure a new pool of IP addresses.This should not conflict with any WAN, LAN, DMZ or WLAN subnet even if they are not in use.
Authentication MethodSelect how the Zyxel Device authenticates a remote user before allowing access to the L2TP VPN tunnel.The authentication method has the Zyxel Device check a user's user name and password against the Zyxel Device's local database, a remote LDAP, RADIUS, a Active Directory server, or more than one of these.
Authentication Server CertificateSelect the certificate to use to identify the Zyxel Device for L2TP VPN connections. You must have certificates already configured in the My Certificates screen. The certificate is used with the EAP, PEAP, and MSCHAPv2 authentication protocols.
LABEL DESCRIPTION
Allowed UserThe remote user must log into the Zyxel Device to use the L2TP VPN tunnel.Select a user or user group that can use the L2TP VPN tunnel. UseCreate new Objectif you need to configure a new user account. Otherwise, selectanyto allow any user with a valid account and password on the Zyxel Device to log in.
Keep Alive TimerThe Zyxel Device sends a Hello message after waiting this long without receiving any traffic from the remote user. The Zyxel Device disconnects the VPN tunnel if the remote user does not respond.
First DNS Server, Second DNS ServerSpecify the IP addresses of DNS servers to assign to the remote users. You can specify these IP addresses two ways.Custom Defined- enter a static IP address.From ISP-use the IP address of a DNS server that another interface received from its DHCP server.
First WINS Server, Second WINS ServerThe WINS (Windows Internet Naming Service) server keeps a mapping table of the computer names on your network and the IP addresses that they are currently using.Type the IP addresses of up to two WINS servers to assign to the remote users. You can specify these IP addresses two ways.
ApplyClickApplyto save your changes in the Zyxel Device.
ResetClickResetto return the screen to its last-saved settings.

21.2.1 Example: L2TP and Zyxel Device Behind a NAT Router

If the Zyxel Device (Z) is behind a NAT router (N), then do the following for remote clients (C) to access the network behind the Zyxel Device (Z) using L2TP over IPv4.

Figure 320 L2TP and Zyxel Device Behind a NAT Router
ZYXEL USGFLEX700-GB0101F - Example: L2TP and Zyxel Device Behind a NAT Router - 1

1 Create an address object in Configuration > Object > Address/ GEO IP > Address for the WAN IP address of the NAT router.

Add Address Rule Name: NATrouterIP Address Type: HOST IP Address: 1.1.1.1 OK Cancel

2 Go to Configuration >VPN>IPSec VPN>VPN Connection and click Add for IPv4 Configuration to create a new VPN connection.
3 Select Remote Access (Server Role) as the VPN scenario for the remote client.
4 Select the NAT router WAN IP address object as the Local Policy.

Show Advanced Settings Create new Object General Settings Enable Connection Name: L2TP-IPSec-NAT Advance VPN Gateway Application Scenario Site-to-site Site-to-site with Dynamic Peer Remote Access (Server Role) Remote Access (Client Role) Vpn Tunnel Interface VPN Gateway: WIZ_L2TP_VPN wan1 0.0.0.0.0.0.0 Policy Local policy: NATrouterIP HOST, 1.1.1.1

5 Go to Configuration > VPN > L2TP VPN and select the VPN Connection just configured.

L2TP VPN Show Advanced Settings Create new Object General Settings Configuration Walkthrough Troubleshooting Enable L2TP Over IPSec VPN Connection: L2TP-IPSec-NAT IP Address Pool: WIZ_L2TP_VPN_IP_1 RANGE, 0.0.0.0-0.0.0.0 Authentication Method: default local Advance Allowed User: any Keep Alive Timer: 60 (1-180 seconds) First DNS Server (Optional): Custom Defined Second DNS Server (Optional): Custom Defined First WINS Server (Optional): Second WINS Server (Optional): Apply Reset

CHAPTER 22

BWM (Bandwidth

Management)

22.1 Overview

Bandwidth management provides a convenient way to manage the use of various services on the network. It manages general protocols (for example, HTTP and FTP) and applies traffic prioritization to enhance the performance of delay-sensitive applications like voice and video.

22.1.1 What You Can Do in this Chapter

Use the BWM screens (see Section 22.2 on page 469) to control bandwidth for services passing through the Zyxel Device, and to identify the conditions that define the bandwidth control.

22.1.2 What You Need to Know

When you allow a service, you can restrict the bandwidth it uses. It controls TCP and UDP traffic. Use policy routes to manage other types of traffic (like ICMP).

Note: Bandwidth management in policy routes has priority over TCP and UDP traffic policies.

If you want to use a service, make sure both the security policy allow the service's packets to go through the Zyxel Device.

Note: The Zyxel Device checks security policies before it checks bandwidth management rules for traffic going through the Zyxel Device.

Bandwidth management examines every TCP and UDP connection passing through the Zyxel Device. Then, you can specify, by port, whether or not the Zyxel Device continues to route the connection.

BWM Type

The Zyxel Device supports three types of bandwidth management: Shared, Per user and Per-Source-IP.

The Shared BWM type is selected by default in a bandwidth management rule. All matched traffic shares the bandwidth configured in the rule.

If the BWM type is set to Per user in a rule, each user that matches the rule can use up to the configured bandwidth by his/her own.

Select the Per-Source-IP type when you want to set the maximum bandwidth for traffic from an individual source IP address.

In the following example, you configure a Per user bandwidth management rule for radius-users to limit outgoing traffic to 300 kbs. Then all radius-users (A, B and C) can send 300 kbps of traffic.

Figure 321 Bandwidth Management Per User Type
ZYXEL USGFLEX700-GB0101F - BWM Type - 1

flowchart
graph LR
    A["Computer A"] -->|300 kbps| B["Internet"]
    B -->|300 kbps| C["Computer C"]
    B -->|300 kbps| D["Computer B"]
    D -->|300 kbps| E["Internet"]

DiffServ and DSCP Marking

QoS is used to prioritize source-to-destination traffic flows. All packets in the same flow are given the same priority. CoS (class of service) is a way of managing traffic in a network by grouping similar types of traffic together and treating each type as a class. You can use CoS to give different priorities to different packet types.

DiffServ (Differentiated Services) is a class of service (CoS) model that marks packets so that they receive specific per-hop treatment at DiffServ-compliant network devices along the route based on the application types and traffic flow. Packets are marked with DiffServ Code Points (DSCPs) indicating the level of service desired. This allows the intermediary DiffServ-compliant network devices to handle the packets differently depending on the code points without the need to negotiate paths or remember state information for every flow. In addition, applications do not have to request a particular service or give advanced notice of where the traffic is going.

Connection and Packet Directions

Bandwidth management looks at the connection direction, that is, from which interface the connection was initiated and to which interface the connection is going.

A connection has outbound and inbound packet flows. The Zyxel Device controls the bandwidth of traffic of each flow as it is going out through an interface or VPN tunnel.

  • The outbound traffic flows from the connection initiator to the connection responder.
  • The inbound traffic flows from the connection responder to the connection initiator.

For example, a LAN1 to WAN connection is initiated from LAN1 and goes to the WAN.

- Outbound traffic goes from a LAN1 device to a WAN device. Bandwidth management is applied before sending the packets out a WAN interface on the Zyxel Device.

- Inbound traffic comes back from the WAN device to the LAN1 device. Bandwidth management is applied before sending the traffic out a LAN1 interface.

Figure 322 LAN1 to WAN Connection and Packet Directions
ZYXEL USGFLEX700-GB0101F - Connection and Packet Directions - 1

flowchart
graph LR
    A["LAN 1"] -->|Connection| B["Internet"]
    A --> C["BMW"]
    C --> D["Inbound"]
    D --> E["Outbound"]
    E --> A

Outbound and Inbound Bandwidth Limits

You can limit an application's outbound or inbound bandwidth. This limit keeps the traffic from using up too much of the out-going interface's bandwidth. This way you can make sure there is bandwidth for other applications. When you apply a bandwidth limit to outbound or inbound traffic, each member of the out-going zone can send up to the limit. Take a LAN1 to WAN policy for example.

  • Outbound traffic is limited to 200 kbps. The connection initiator is on the LAN1 so outbound means the traffic traveling from the LAN1 to the WAN. Each of the WAN zone's two interfaces can send the limit of 200 kbps of traffic.
  • Inbound traffic is limited to 500 kbs. The connection initiator is on the LAN1 so inbound means the traffic traveling from the WAN to the LAN1.

Figure 323 LAN1 to WAN, Outbound 200 kbps, Inbound 500 kbps
P1 P2 P3 P4 P5 Outbound 200 kbps Inbound 500 kbps

Bandwidth Management Priority

  • The Zyxel Device gives bandwidth to higher-priority traffic first, until it reaches its configured bandwidth rate.
  • Then lower-priority traffic gets bandwidth.
  • The Zyxel Device uses a fairness-based (round-robin) scheduler to divide bandwidth among traffic flows with the same priority.
  • The Zyxel Device automatically treats traffic with bandwidth management disabled as priority 7 (the lowest priority).

Maximize Bandwidth Usage

Maximize bandwidth usage allows applications with maximize bandwidth usage enabled to "borrow" any unused bandwidth on the out-going interface.

After each application gets its configured bandwidth rate, the Zyxel Device uses the fairness-based scheduler to divide any unused bandwidth on the out-going interface amongst applications that need more bandwidth and have maximize bandwidth usage enabled.

Unused bandwidth is divided equally. Higher priority traffic does not get a larger portion of the unused bandwidth.

Bandwidth Management Behavior

The following sections show how bandwidth management behaves with various settings. For example, you configure DMZ to WAN policies for FTP servers A and B. Each server tries to send 1000 kbps, but the WAN is set to a maximum outgoing speed of 1000 kbps. You configure policy A for server A's traffic and policy B for server B's traffic.

Figure 324 Bandwidth Management Behavior
ZYXEL USGFLEX700-GB0101F - Bandwidth Management Behavior - 1

flowchart
graph LR
    A["DMZ"] -->|1000 kbps| B["Internet"]
    B -->|BMW 1000 kbps| C["WAN"]
    style A fill:#333,stroke:#fff,color:#fff
    style B fill:#333,stroke:#fff,color:#fff
    style C fill:#fff,stroke:#000,stroke-width:2px

Configured Rate Effect

In the following table the configured rates total less than the available bandwidth and maximize bandwidth usage is disabled, both servers get their configured rate.

Table 181 Configured Rate Effect

POLICY CONFIGURED RATE MAX. B.U. PRIORITY ACTUAL RATE
A 300 kbps No 1 300 kbps
B 200 kbps No 1 200 kbps

Priority Effect

Here the configured rates total more than the available bandwidth. Because server A has higher priority, it gets up to its configured rate (800 kbps), leaving only 200 kbps for server B.

Table 182 Priority Effect

POLICYCONFIGURED RATEMAX. B. U.PRIORITYACTUAL RATE
A 800 kbps Yes 1 800 kbps
B 1000 kbps Yes 2 200 kbps

Maximize Bandwidth Usage Effect

With maximize bandwidth usage enabled, after each server gets its configured rate, the rest of the available bandwidth is divided equally between the two. So server A gets its configured rate of 300 kbps and server B gets its configured rate of 200 kbps. Then the Zyxel Device divides the remaining bandwidth (1000 - 500 = 500) equally between the two (500 / 2 = 250 kbps for each). The priority has no effect on how much of the unused bandwidth each server gets.

So server A gets its configured rate of 300 kbps plus 250 kbps for a total of 550 kbps. Server B gets its configured rate of 200 kbps plus 250 kbps for a total of 450 kbps.

Table 183 Maximize Bandwidth Usage Effect

POLICYCONFIGURED RATE MAX. B.U. PRIORITY AACTUAL RATE
A 300 kbpsYes 1 550 kbps
B200 kbpsYes2450 kbps

Priority and Over Allotment of Bandwidth Effect

Server A has a configured rate that equals the total amount of available bandwidth and a higher priority. You should regard extreme over allotment of traffic with different priorities (as shown here) as a configuration error. Even though the Zyxel Device still attempts to let all traffic get through and not be lost, regardless of its priority, server B gets almost no bandwidth with this configuration.

Table 184 Priority and Over Allotment of Bandwidth Effect

POLICYCONFIGURED RATEMAX. B. U.PRIORITYACTUAL RATE
A1000 kbpsYes1999 kbps
B1000 kbpsYes21 kbps

22.2 The Bandwidth Management Configuration

The Bandwidth management screens control the bandwidth allocation for TCP and UDP traffic. You can use source interface, destination interface, destination port, schedule, user, source, destination information, DSCP code and service type as criteria to create a sequence of specific conditions, similar to the sequence of rules used by firewalls, to specify how the Zyxel Device handles the DSCP value and allocate bandwidth for the matching packets.

Click Configuration > BWM to open the following screen. This screen allows you to enable/disable bandwidth management and add, edit, and remove user-defined bandwidth management policies.

The default bandwidth management policy is the one with the priority of "default". It is the last policy the Zyxel Device checks if traffic does not match any other bandwidth management policies you have configured. You cannot remove, activate, deactivate or move the default bandwidth management policy.

Figure 325 Configuration > Bandwidth Management
BWM BWM Global Setting Enable BWM Enable Highest Bandwidth Priority for SIP Traffic Configuration Add Edit Remove Activate Inactivate Move SI... Pr... Descr... BWM ... User Schel... Incoml... Outgol... Source Desll... DS... Service BWM In/P... DSCP M... d... shared any none any any any any any any Obj:any no/7/no/7 preserv... Page 1 of 1 Show 50 items Displaying 1 - 1 of 1 Apply Reset

The following table describes the labels in this screen. See Section 22.2.1 on page 472 for more information as well.

Table 185 Configuration > Bandwidth Management

LABEL DESCRIPTION
Enable BWM Select thischeck box to activate management bandwidth.
Enable Highest Bandwidth Priority for SIP TrafficSelect this to maximize the throughput of SIP traffic to improve SIP-based VoIP call sound quality. This has the Zyxel Device immediately send SIP traffic upon identifying it. When this option is enabled the Zyxel Device ignores any other application patrol rules for SIP traffic (so there is no bandwidth control for SIP traffic) and does not record SIP traffic bandwidth usage statistics.
AddClick this to create a new entry. Select an entry and click Add to create a new entry after the selected entry.
EditSelect an entry and click this to be able to modify it.
Remove Select an entryand click this to delete it.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
MoveTo change an entry's position in the numbered list, select it and click Move to display a field to type a number for where you want to put that entry and press [ENTER] to move the entry to the number that you typed.
StatusThe activate (light bulb) icon is lit when the entry is active and dimmed when the entry is inactive. The status icon is not available for the default bandwidth management policy.
PriorityThis field displays a sequential value for each bandwidth management policy and it is not associated with a specific setting.This field displays default for the default bandwidth management policy.
Description This field displays additional information about this policy.
BWM Type This field displays the below types of BWM:Shared, when the policy is set for all matched trafficPer User, when the policy is set for an individual user or a user groupPer-Source-IP, when the policy is set for a source IP

Table 185 Configuration > Bandwidth Management

LABEL DESCRIPTION
UserThis is the type of user account to which the policy applies. If any displays, the policy applies to all user accounts.
ScheduleThis is the schedule that defines when the policy applies. none means the policy always applies.
Incoming InterfaceThis is the source interface of the traffic to which this policy applies.
Outgoing InterfaceThis is the destination interface of the traffic to which this policy applies.
SourceThis is the source address or address group, including geographic address and FQDN (group) objects, for whom this policy applies. If any displays, the policy is effective for every source.
DestinationThis is the destination address or address group, including geographic address and FQDN (group) objects, for whom this policy applies. If any displays, the policy is effective for every destination.
DSCP CodeThese are the DSCP code point values of incoming and outgoing packets to which this policy applies. The lower the number the higher the priority with the exception of 0 which is usually given only best-effort treatment.any means all DSCP value or no DSCP marker.default means traffic with a DSCP value of 0. This is usually best effort trafficThe "af" options stand for Assured Forwarding. The number following the "af" identifies one of four classes and one of three drop preferences.
ServiceApp and the service name displays if you selected Application Object for the service type. An Application Object is a pre-defined service.Obj and the service name displays if you selected Service Object for the service type. A Service Object is a customized pre-defined service or another service. Mouse over the service object name to view the corresponding IP protocol number.
BWM In/Pri/Out/Pri This field shows the amount of bandwidth the traffic can use.In - This is how much inbound bandwidth, in kilobits per second, this policy allows the matching traffic to use. Inbound refers to the traffic the Zyxel Device sends to a connection's initiator. If no displays here, this policy does not apply bandwidth management for the inbound traffic.Out - This is how much outgoing bandwidth, in kilobits per second, this policy allows the matching traffic to use. Outbound refers to the traffic the Zyxel Device sends out from a connection's initiator. If no displays here, this policy does not apply bandwidth management for the outbound traffic.Pri - This is the priority for the incoming (the first Pri value) or outgoing (the second Pri value) traffic that matches this policy. The smaller the number, the higher the priority. Traffic with a higher priority is given bandwidth before traffic with a lower priority. The Zyxel Device ignores this number if the incoming and outgoing limits are both set to 0. In this case the traffic is automatically treated as being set to the lowest priority (7) regardless of this field's configuration.

Table 185 Configuration > Bandwidth Management

LABEL DESCRIPTION
DSCP MarkingThis is how the Zyxel Device handles the DSCP value of the incoming and outgoing packets that match this policy.In - Inbound, the traffic the Zyxel Device sends to a connection's initiator.Out - Outbound, the traffic the Zyxel Device sends out from a connection's initiator.If this field displays a DSCP value, the Zyxel Device applies that DSCP value to the route's outgoing packets.preserve means the Zyxel Device does not modify the DSCP value of the route's outgoing packets.default means the Zyxel Device sets the DSCP value of the route's outgoing packets to 0.The "af" choices stand for Assured Forwarding. The number following the "af" identifies one of four classes and one of three drop preferences.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

22.2.1 The Bandwidth Management Add/Edit Screen

The Configuration > Bandwidth Management Add/Edit screen allows you to create a new condition or edit an existing one.

802.1P Marking

Use 802.1P to prioritize outgoing traffic from a VLAN interface. The Priority Code is a 3-bit field within a 802.1Q VLAN tag that's used to prioritize associated outgoing VLAN traffic. "0" is the lowest priority level and "7" is the highest.

Table 186 Single Tagged 802.1Q Frame Format

DASATPIDPriorityVIDLen/EtypeDataFCSIEEE 802.1Q customer tagged frame

Table 187 802.1Q Frame

DADestination AddressPriority802.1p Priority
SASource AddressLen/EtypeLength and type of Ethernet frame
TPIDTag Protocol IDentifierDataFrame data
VIDVLAN IDFCSFrame Check Sequence

The following table is a guide to types of traffic for the priority code.

Table 188 Priority Code and Types of Traffic

PRIORITYTRAFFIC TYPES
0 (lowest) Background
1Best Effort
2Excellent Effort
3Critical Applications
4Video, less than 100 ms latency and jitter
5Voice, less than 10 ms latency and jitter

Table 188 Priority Code and Types of Traffic

PRIORITY TRAFFIC TYPES
6 Internetwork Control
7 (highest) Network Control

To access this screen, go to the Configuration > Bandwidth Management screen (see Section 22.2 on page 469), and click either the Add icon or an Edit icon.

Figure 326 Configuration > Bandwidth Management > Edit (For the Default Policy)
Edit Policy Create new Object ▼ Bandwidth Shaping Guaranteed Bandwidth Inbound Priority: 7 Outbound Priority: 7 OK Cancel

Figure 327 Configuration > Bandwidth Management > Add/Edit
Add Policy Create new Object Configuration Enable Description: (Optional) BWM Type: Shared Per user Per-Source-IP Criteria User: any Schedule: none Incoming Interface: any Outgoing Interface: any Source: any Destination: any DSCP Code: any Service Type: Service Object Application Object Service Object: any DSCP Marking DSCP Marking Inbound Marking: preserve Outbound Marking: preserve Bandwidth Shaping Guaranteed Bandwidth Inbound: 0 kbps (0 : disabled) Priority: 4 Maximize Bandwidth Usage Maximum: 0 kbps Outbound: 0 kbps (0 : disabled) Priority: 4 Maximize Bandwidth Usage Maximum: 0 kbps 802.1P Marking Priority Code 0 (0-7) Interface none Related Setting Log: no OK Cancel

The following table describes the labels in this screen.

Table 189 Configuration > Bandwidth Management > Add/Edit

LABEL DESCRIPTION
Create new ObjectUse to configure any new settings objects that you need to use in this screen.
Configuration
Enable Select this checkbox to turn on this policy.
DescriptionEnter a description of this policy. It is not used elsewhere. You can use alphanumeric and ( ) +/ :=?!*#@$_%- characters, and it can be up to 60 characters long.
CriteriaUse this section to configure the conditions of traffic to which this policy applies.
BWM Type This field displays the below types of BWM rule:Shared, when the policy is set for all usersPer User, when the policy is set for an individual user or a user groupPer Source IP, when the policy is set for a source IP

Table 189 Configuration > Bandwidth Management > Add/Edit

LABEL DESCRIPTION
UserSelect a user name or user group to which to apply the policy. UseCreate new Objectif you need to configure a new user account. Selectanyto apply the policy for every user.
ScheduleSelect a schedule that defines when the policy applies or selectCreate Objectto configure a new one. Otherwise, selectnoneto make the policy always effective.
Incoming InterfaceSelect the source interface of the traffic to which this policy applies.
Outgoing InterfaceSelect the destination interface of the traffic to which this policy applies.
SourceSelect a source address or address group, including geographic address and FQDN (group) objects, for whom this policy applies. UseCreate new Objectif you need to configure a new one. Selectanyif the policy is effective for every source.
DestinationSelect a destination address or address group, including geographic address and FQDN (group) objects, for whom this policy applies. UseCreate new Objectif you need to configure a new one. Selectanyif the policy is effective for every destination.
DSCP CodeSelect a DSCP code point value of incoming packets to which this policyroute applies or selectUser Definedto specify another DSCP code point. The lower the number the higher the priority with the exception of 0 which is usually given only best-effort treatment.anymeans all DSCP value or no DSCP marker.defaultmeans traffic with a DSCP value of 0. This is usually best effort trafficThe "af" choices stand for Assured Forwarding. The number following the "af" identifies one of four classes and one of three drop preferences.
User-Defined DSCP CodeUse this field to specify a custom DSCP code point.
Service TypeSelectService ObjectorApplication Objectif you want a specific service (defined in a service object) or application patrol service to which the policy applies.
Service ObjectThis field is available if you selectedService Objectas the service type.Select a service or service group to identify the type of traffic to which this policy applies.anymeans all services.
Application ObjectThis field is available if you selectedApplication Objectas the service type.Select an application patrol service to identify the specific traffic to which this policy applies.
DSCP MarkingSet how the Zyxel Device handles the DSCP value of the incoming and outgoing packets that match this policy. Inbound refers to the traffic the Zyxel Device sends to a connection's initiator. Outbound refers to the traffic the Zyxel Device sends out from a connection's initiator.Select one of the pre-defined DSCP values to apply or selectUser Definedto specify another DSCP value. The "af" choices stand for Assured Forwarding. The number following the "af" identifies one of four classes and one of three drop preferences.Selectpreserveto have the Zyxel Device keep the packets' original DSCP value.Selectdefaultto have the Zyxel Device set the DSCP value of the packets to 0.
Bandwidth ShapingConfigure these fields to set the amount of bandwidth the matching traffic can use.

Table 189 Configuration > Bandwidth Management > Add/Edit

LABEL DESCRIPTION
Inbound kbpsType how much inbound bandwidth, in kilobits per second, this policy allows the traffic to use. Inbound refers to the traffic the Zyxel Device sends to a connection's initiator.If you enter 0 here, this policy does not apply bandwidth management for the matching traffic that the Zyxel Device sends to the initiator. Traffic with bandwidth management disabled (inbound and outbound are both set to 0) is automatically treated as the lowest priority (7).If the sum of the bandwidths for routes using the same next hop is higher than the actual transmission speed, lower priority traffic may not be sent if higher priority traffic uses all of the actual bandwidth.
Outbound kbpsType how much outbound bandwidth, in kilobits per second, this policy allows the traffic to use. Outbound refers to the traffic the Zyxel Device sends out from a connection's initiator.If you enter 0 here, this policy does not apply bandwidth management for the matching traffic that the Zyxel Device sends out from the initiator. Traffic with bandwidth management disabled (inbound and outbound are both set to 0) is automatically treated as the lowest priority (7).If the sum of the bandwidths for routes using the same next hop is higher than the actual transmission speed, lower priority traffic may not be sent if higher priority traffic uses all of the actual bandwidth.
PriorityThis field displays when the inbound or outbound bandwidth management is not set to 0.Enter a number between 1 and 7 to set the priority for traffic that matches this policy. The smaller the number, the higher the priority.Traffic with a higher priority is given bandwidth before traffic with a lower priority.The Zyxel Device uses a fairness-based (round-robin) scheduler to divide bandwidth between traffic flows with the same priority.The number in this field is ignored if the incoming and outgoing limits are both set to 0. In this case the traffic is automatically treated as being set to the lowest priority (7) regardless of this field's configuration.
Maximize Bandwidth UsageThis field displays when the inbound or outbound bandwidth management is not set to 0and the BWM Type is set to Shared. Enable maximize bandwidth usage to let the traffic matching this policy "borrow" all unused bandwidth on the out-going interface.After each application or type of traffic gets its configured bandwidth rate, the Zyxel Device uses the fairness-based scheduler to divide any unused bandwidth on the outgoing interface among applications and traffic types that need more bandwidth and have maximize bandwidth usage enabled.
MaximumIf you did not enable Maximize Bandwidth Usage, then type the maximum unused bandwidth that traffic matching this policy is allowed to "borrow" on the out-going interface (in Kbps), here.
802.1P Marking Use 802.1P to prioritize outgoing traffic from a VLAN interface.
Priority CodeThis is a 3-bit field within a 802.1Q VLAN tag that's used to prioritize associated outgoing VLAN traffic. "0" is the lowest priority level and "7" is the highest. See Table 188 on page 472. The setting configured here overwrites existing priority settings.
InterfaceChoose a VLAN interface to which to apply the priority level for matching frames.
Related Setting
LogSelect whether to have the Zyxel Device generate a log (log), log and alert (log alert) or neither (no) when any traffic matches this policy.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving your changes.

22.2.1.1 Adding Objects for the BWM Policy

Objects are parameters to which the Policy rules are built upon. There are three kinds of objects you can add/edit for the BWM policy, they are User, Schedule and Address objects. Click Configuration >BWM >Add >Create New Object >Add User to see the following screen.

Figure 328 Configuration >BWM > Create New Object > Add User
Add Policy Create new Object Configuration Enable Description: BWM Type: Shared Criteria User: any Schedule: none Incoming Interface: any Outgoing Interface: any Source: any Destination: any DSCP Code: any Service Type: Service Object Application Object Service Object: any DSCP Marking DSCP Marking Inbound Marking: preserve Outbound Marking: preserve Bandwidth Shaping Guaranteed Bandwidth Inbound: 0 kbps (0 : disabled) Priority: 4 Maximize Bandwidth Usage Maximum: 0 kbps Outbound: 0 kbps (0 : disabled) Priority: 4 Maximize Bandwidth Usage Maximum: 0 kbps 802.1P Marking Priority Code 0 (0-7) Interface none Related Setting Log: no Add A User User Configuration User Name: user User Type: password: Retype: Description: Local User Authentication Timeout Settings Use Default Settings Use Manual Settings Lease Time: 1440 minutes Reauthentication Time: 1440 minutes OK Cancel

The following table describes the fields in the above screen.

Table 190 Configuration > BWM > Create New Object > Add User

LABEL DESCRIPTION
User Name Type a user or usergroup object name of the rule.
User TypeSelect a user type from the drop down menu. The user types are Admin, Limited admin, User, Guest, Ext-user, Ext-group-user.

Table 190 Configuration > BWM > Create New Object > Add User

LABEL DESCRIPTION
Password Type a password forthe user object. The password can consist of alphanumeric characters, the underscore, and some punctuation marks (+/-/*=::!@&%#~‘\() ), and it can be up to eight characters long.
Retype Retype the passwordto confirm.
DescriptionEnter a description for this user object. It is not used elsewhere. You can use alphanumeric and () +/:=?!*#@_%- characters, and it can be up to 60 characters long.
Authentication Timeout SettingsChoose either Use Default setting option, which shows the default Lease Time of 1,440 minutes and Reauthentication Time of 1,440 minutes or you can enter them manually by choosing Use Manual Settings option.
Lease TimeThis shows the Lease Time setting for the user, by default it is 1,440 minutes.
Reauthentication TimeThis shows the Reauthentication Time for the user, by default it is 1,440 minutes.
OK Click OK to save the setting.
Cancel Click Cancel to abandon this screen.

Figure 329 Configuration > BWM > Create New Object > Add Schedule
Add Policy Create new Object Configuration Enable Description: BWM Type: Shared Criteria User: any Schedule: none Incoming Interface: any Outgoing Interface: any Source: any Destination: any DSCP Code: any Service Type: Service Object: any DSCP Marking DSCP Marking Inbound Marking: preserve Outbound Marking: preserve Bandwidth Shaping Guaranteed Bandwidth Inbound: 0 kbps (0 : disabled) Priority: 4 Maximize Bandwidth Usage Maximum: 0 kbps Outbound: 0 kbps (0 : disabled) Priority: 4 Maximize Bandwidth Usage Maximum: 0 kbps 802.1P Marking Priority Code 0 (0-7) Interface none Related Setting Log: no Create Schedule Object Configuration Name: Type: One Time Day Time Start Date: Start Time: Stop Date: Stop Time: OK Cancel

The following table describes the fields in the above screen.

Table 191 Configuration > BWM > Create New Object > Add Schedule

LABEL DESCRIPTION
Name Enter a name for the schedule object of the rule.
TypeSelect an option from the drop down menu for the schedule object. It will show One Time or Recurring.
Start DateClick the icon menu on the right to choose a Start Date for the schedule object.
Start Time Click the icon menuon the right to choose a Start Time for the schedule object.
Stop Date Click the icon menuon the right to choose a Stop Date for schedule object.
Stop TimeClick the icon menu on the right to choose a Stop Time for the schedule object.

Figure 330 Configuration > BWM > Create New Object > Add Address
Add Policy Create new Object Configuration Enable Description: BWM Type: Shared Criteria User: any Schedule: none Incoming Interface: any Outgoing Interface: any Source: any Destination: any DSCP Code: any Service Type: Service Object any DSCP Marking DSCP Marking Inbound Marking: preserve Outbound Marking: preserve Bandwidth Shaping Guaranteed Bandwidth Inbound: 0 kbps (0 : disabled) Priority: 4 Maximize Bandwidth Usage Maximum: 0 kbps Outbound: 0 kbps (0 : disabled) Priority: 4 Maximize Bandwidth Usage Maximum: 0 kbps 802.1P Marking Priority Code 0 (0-7) Interface none Related Setting Log: no Add Address Rule Name: Address Type: HOST IP Address: 0.0.0.0 OK Cancel Application Object OK Cancel

The following table describes the fields in the above screen.

Table 192 Configuration > BWM > Create New Object > Add Address

LABEL DESCRIPTION
Name Enter a name for the Address object of the rule.
Address TypeSelect an Address Type from the drop down menu on the right. The Address Types are Host, Range, Subnet, Interface IP, Interface Subnet, and Interface Gateway.
IP Address Enter an IP address for the Address object.
OK Click OK to save the setting.
Cancel Click Cancel to abandon the setting.

CHAPTER 23

Web Authentication

23.1 Web Auth Overview

Web authentication can intercept network traffic, according to the authentication policies, until the user authenticates his or her connection, usually through a specifically designated login web page. This means all web page requests can initially be redirected to a special web page that requires users to authenticate their sessions. Once authentication is successful, they can then connect to the rest of the network or Internet.

As soon as a user attempt to open a web page, the Zyxel Device reroutes his/her browser to a web portal page that prompts him/her to log in.

Figure 331 Web Authentication Example
ZYXEL USGFLEX700-GB0101F - Web Auth Overview - 1

The web authentication page only appears once per authentication session. Unless a user session times out or he/she closes the connection, he or she generally will not see it again during the same session.

23.1.1 What You Can Do in this Chapter

  • Use the Configuration > Web Authentication screens (Section 23.2 on page 482) to create and manage web authentication policies.
  • Use the Configuration > Web Authentication > SSO screen (Section 23.3 on page 502) to configure how the Zyxel Device communicates with a Single Sign-On agent.

23.1.2 What You Need to Know

Single Sign-On

A SSO (Single Sign On) agent integrates Domain Controller and Zyxel Device authentication mechanisms, so that users just need to log in once (single) to get access to permitted resources.

Forced User Authentication

Instead of making users for which user-aware policies have been configured go to the Zyxel Device Login screen manually, you can configure the Zyxel Device to display the Login screen automatically whenever it routes HTTP traffic for anyone who has not logged in yet.

Note: This works with HTTP traffic only. The Zyxel Device does not display the Login screen when users attempt to send other kinds of traffic.

The Zyxel Device does not automatically route the request that prompted the login, however, so users have to make this request again.

23.2 Web Authentication General Screen

The Web Authentication General screen displays the general web portal settings and web authentication policies you have configured on the Zyxel Device. Use this screen to enable web authentication on the Zyxel Device.

Figure 332 Configuration > Web Authentication > General
Web Authentication SSO General Authentication Type Custom Web Portal File Custom User Agreement File Global Setting Enable Web Authentication Web Portal General Setting Enable Session Page Logout IP: 1.1.1.1 User Agreement General Setting Enforce data collection Exceptional Services Add Remove Exceptional Services DNS Page 1 of 1 Show 50 items Displaying 1 - 1 of 1 Web Authentication Policy Summary Add Edit Remove Activate Inactivate Move St... Priority ▲ Incoming ... Source Destination Schedule Authentic... Authentic... Description I Default any any any none unness... n/a n/a Page 1 of 1 Show 50 items Displaying 1 - 1 of 1 Apply Reset

The following table gives an overview of the objects you can configure.

Table 193 Configuration > Web Authentication > General

LABEL DESCRIPTION
Global Setting
Enable Web AuthenticationSelect the check box to turn on the web authentication feature. Otherwise, clear the check box to turn it off.Once enabled, all network traffic is blocked until a client authenticates with the Zyxel Device through the specifically designated web portal or user agreement page.
Web Portal General Setting
Enable Session PageSelect this to display a page showing information on the user session after s/he logs in. It displays remaining time with an option to renew or log out immediately.
Logout IPSpecify an IP address that users can use to terminate their sessions manually by entering the IP address in the address bar of the web browser.
User Agreement General Setting
Enforce data collectionSelect this to require users to fill in their registration information (name, telephone number, address and email address) on the User Agreement (PC or mobile) page.
Exceptional ServicesUse this table to list services that users can access without logging in.ClickAddto change the list's membership. A screen appears. Available services appear on the left. Select any services you want users to be able to access without logging in and click the right arrow button to add them. The member services are on the right. Select any service that you want to remove from the member list, and click the left arrow button to remove them. Keeping DNS as a member allows users' computers to resolve domain names into IP addresses.Figure 333 Configuration > Web Authentication > Add Exceptional ServiceZYXEL USGFLEX700-GB0101F - Web Authentication General Screen - 2In the table, select one or more entries and clickRemoveto delete it or them.
Web Authentication Policy SummaryUse this table to manage the Zyxel Device's list of web authentication policies.
AddClick this to create a new entry. Select an entry and clickAddto create a new entry after the selected entry.
EditDouble-click an entry or select it and clickEditto open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and clickRemove. The Zyxel Device confirms you want to remove it before doing so.
ActivateTo turn on an entry, select it and clickActivate.
InactivateTo turn off an entry, select it and clickInactivate.
MoveTo move an entry to a different number in the list, click theMoveicon. In the field that appears, specify the number to which you want to move the interface.
#This field is a sequential value showing the number of the profile. The profile order is not important.
StatusThis icon is lit when the entry is active and dimmed when the entry is inactive.
PriorityThis is the position of the authentication policy in the list. The priority is important as the policies are applied in order of priority.Defaultdisplays for the default authentication policy that the Zyxel Device uses on traffic that does not match any exceptional service or other authentication policy. You can edit the default rule but not delete it.
Incoming InterfaceThis field displays the interface on which packets for this policy are received.
SourceThis displays the source address object, including geographic address and FQDN (group) objects, to which this policy applies.
DestinationThis displays the destination address object, including geographic address and FQDN (group) objects, to which this policy applies.
ScheduleThis field displays the schedule object that dictates when the policy applies. nonemeans the policy is active at all times if enabled.
AuthenticationThis field displays the authentication requirement for users when their traffic matches this policy.unnecessary- Users do not need to be authenticated.required- Users need to be authenticated. They must manually go to the login screen or user agreement page. The Zyxel Device will not redirect them to the login screen.force- Users need to be authenticated. The Zyxel Device automatically displays the login screen or user agreement page whenever it routes HTTP traffic for users who have not logged in yet.
Authentication TypeThis field displays the name of the authentication type profile used in this policy to define how users authenticate their sessions. It shows n/a if Authentication is set to unnecessary.
DescriptionIf the entry has a description configured, it displays here. This is n/a for the default policy.
ApplyClick this button to save your changes to the Zyxel Device.
Reset Click this buttonon to return the screen to its last-saved settings.

Creating Exceptional Services

This screen lists services that users can access without logging in. Click Add under Exceptional Services in the previous screen to display this screen. You can change the list's membership here. Available services appear on the left. Select any services you want users to be able to access without logging in and click the right arrow button -> to add them. The member services are on the right. Select any service that you want to remove from the member list, and click the left arrow <- button to remove them. Then click OK to apply the changes and return to the main Web Authentication screen. Alternatively, click Cancel to discard the changes and return to the main Web Authentication screen.

Figure 334 Configuration > Web Authentication > General > Add Exceptional Service
Edit Exceptional Services List Available === Object === AH AIM AUTH Any_TCP Any_UDP BGP BONJOUR BOOTP_CLIENT BOOTP_SERVER CAPWAP-CONTROL CAPWAP-DATA Member === Group === DNS OK Cancel

Creating/ Editing an Authentication Policy

Open the Configuration > Web Authentication > General screen, then click the Add icon or select an entry and click the Edit icon in the Web Authentication Policy Summary section to open the Auth. Policy Add/Edit screen. Use this screen to configure an authentication policy.

Figure 335 Configuration > Web Authentication > General > Add Authentication Policy
Auth. Policy Add Create new Object ▼ General Settings Enable Policy Description: (Optional) User Authentication Policy Incoming Interface: any Source Address: any Destination Address: any Schedule: none Authentication: required Single Sign-on Force User Authentication Authentication Type: default-web-porta OK Cancel

The following table gives an overview of the objects you can configure.

Table 194 Configuration > Web Authentication > General > Add Authentication Policy

LABEL DESCRIPTION
Create new ObjectUse to configure any new settings objects that you need to use in this screen. Select Address or Schedule.
Enable PolicySelect this check box to activate the authentication policy. This field is available for user-configured policies.
DescriptionEnter a descriptive name of up to 60 printable ASCII characters for the policy. Spaces are allowed. This field is available for user-configured policies.
User Authentication PolicyUse this section of the screen to determine which traffic requires (or does not require) the senders to be authenticated in order to be routed.
Incoming InterfaceSelect the interface on which packets for this policy are received.
Source AddressSelect a source address or address group, including geographic address and FQDN (group) objects, for whom this policy applies. Select any if the policy is effective for every source. This is any and not configurable for the default policy.
Destination AddressSelect a destination address or address group, including geographic address and FQDN (group) objects, for whom this policy applies. Select any if the policy is effective for every destination. This is any and not configurable for the default policy.
ScheduleSelect a schedule that defines when the policy applies. Otherwise, select none and the rule is always effective. This is none and not configurable for the default policy.
LABEL DESCRIPTION
AuthenticationSelect the authentication requirement for users when their traffic matches this policy.unnecessary- Users do not need to be authenticated.required- Users need to be authenticated. IfForce User Authenticationis selected, all HTTPtraffic from unauthenticated users is redirected to a default or user-defined login page.Otherwise, they must manually go to the login screen. The Zyxel Device will not redirect them tothe login screen.
Single Sign-onThis field is available for user-configured policies that require Single Sign-On (SSO). Select this tohave the Zyxel Device enable the SSO feature. You can set up this feature in the SSO screen.
Force UserAuthenticationThis field is available for user-configured policies that require authentication. Select this to havethe Zyxel Device automatically display the login screen when users who have not logged in yettry to send HTTP traffic.
AuthenticationTypeSelect an authentication method.default-web-portal: the default login page built into the Zyxel Device.default-user-agreement: the default user agreement page built into the Zyxel Device.
OKClick OKto save your changes back to the Zyxel Device.
CancelClick Cancelto exit this screen without saving.

23.2.1 User-aware Access Control Example

You can configure many policies and security settings for specific users or groups of users. Users can be authenticated locally by the Zyxel Device or by an external (RADIUS) authentication server.

In this example the users are authenticated by an external RADIUS server at 172.16.1.200. First, set up the user accounts and user groups in the Zyxel Device. Then, set up user authentication using the RADIUS server. Finally, set up the policies in the table above.

23.2.1.1 Set Up User Accounts

Set up user accounts in the RADIUS server. This example uses the Web Configurator. If you can export user names from the RADIUS server to a text file, then you might configure a script to create the user accounts instead.

1 Click Configuration > Object > User/Group > User. Click the Add icon.
2 Enter the same user name that is used in the RADIUS server, and set the User Type to ext-user because this user account is authenticated by an external server. Click OK.

Figure 336 Configuration > Object > User/Group > User > Add
Add A User User Configuration User Name : Leo User Type: ext-user Description: Leo Authentication Timeout Settings Use Default Settings Use Manual Settings Lease Time: 1440 minutes Reauthentication Time: 1440 minutes OK Cancel

3 Repeat this process to set up the remaining user accounts.

23.2.1.2 Set Up User Groups

Set up the user groups and assign the users to the user groups.

1 Click Configuration > Object > User/Group > Group. Click the Add icon.
2 Enter the name of the group. In this example, it is "Finance". Then, select Object/Leo and click the right arrow to move him to the Member list. This example only has one member in this group, so click OK. Of course you could add more members later.

Figure 337 Configuration > Object > User/Group > Group > Add
Add Group Configuration Name: Finance Description: (Optional) Member List Available === Object === ad-users ldap-users radius-users ua-users Member === Object === Leo OK Cancel

3 Repeat this process to set up the remaining user groups.

23.2.1.3 Set Up User Authentication Using the RADIUS Server

This step sets up user authentication using the RADIUS server. First, configure the settings for the RADIUS server. Then, set up the authentication method, and configure the Zyxel Device to use the authentication method. Finally, force users to log into the Zyxel Device before it routes traffic for them.

1 Click Configuration > Object > AAA Server > RADIUS. Double-click the radius entry. Configure the RADIUS server's address, authentication port (1812 if you were not told otherwise), and key. Click OK.

Figure 338 Configuration > Object > AAA Server > RADIUS > Add
Edit RADIUS radius General Settings Name: radius Description: (Optional) Authentication Server Settings Server Address: 172.16.1.200 (IP or FQDN) Authentication Port: 1812 (1-65535) Backup Server Address: (IP or FQDN) (Optional) Backup Authentication Port: (1-65535) (Optional) Key: •••• Change of Authorization i Accounting Server Settings Server Address: (IP or FQDN) (Optional) Accounting Port: (1-65535) (Optional) Backup Server Address: (IP or FQDN) (Optional) Backup Accounting Port: (1-65535) (Optional) Key: OK Cancel

2 Click Configuration > Object > Auth. Method. Double-click the default entry. Click the Add icon. Select group radius because the Zyxel Device should use the specified RADIUS server for authentication. Click OK.

Figure 339 Configuration > Object > Auth. method > Edit
Edit Authentication Method default General Settings Name: default Add Edit Remove Move Method List 1 group radius 2 local OK Cancel

3 Click Configuration > Web Authentication. In the Web Authentication > General screen, select Enable Web Authentication to turn on the web authentication feature and click Apply.

Figure 340 Configuration > Web Authentication
General Authentication Type Custom Web Portal File Custom User Agreement File Global Setting Enable Web Authentication Web Portal General Setting Enable Session Page Logout IP: 1.1.1.1 User Agreement General Setting Enforce data collection Exceptional Services Add Remove Exceptional Services 1 DNS Page 1 of 1 Show 50 Items Displaying 1 - 1 of 1 Web Authentication Policy Summary Add Edit Remove Activate Inactivate Move St... Priority ▲ Incoming Interface Source Destin... Sche... Authentication Authentication Type Descri... 1 Default any any any none unnecessary n/a n/a Page 1 of 1 Show 50 Items Displaying 1 - 1 of 1 Apply Reset

4 In the Web Authentication Policy Summary section, click the Add icon to set up a default policy that has priority over other policies and forces every user to log into the Zyxel Device before the Zyxel Device routes traffic for them.
5 Select Enable Policy. Enter a descriptive name, "default_policy" for example. Set the Authentication field to required, and make sure Force User Authentication is selected. Select an authentication type profile ("default-web-portal" in this example). Keep the rest of the default settings, and click OK.

Note: The users must log in at the Web Configurator login screen before they can use HTTP or MSN.

Figure 341 Configuration > Web Authentication: General: Add
Auth. Policy Add Create new Object General Settings Enable Policy Description: default_policy (Optional) User Authentication Policy Incoming Interface: any Source Address: any Destination Address: any Schedule: none Authentication: required Single Sign-on Force User Authentication Authentication Type: default-web-porta OK Cancel

When the users try to browse the web (or use any HTTP application), the login screen appears. They have to log in using the user name and password in the RADIUS server.

23.2.1.4 User Group Authentication Using the RADIUS Server

The previous example showed how to have a RADIUS server authenticate individual user accounts. If the RADIUS server has different user groups distinguished by the value of a specific attribute, you can make a couple of slight changes in the configuration to have the RADIUS server authenticate groups of user accounts defined in the RADIUS server.

1 Click Configuration > Object > AAA Server > RADIUS. Double-click the radius entry. Besides configuring the RADIUS server's address, authentication port, and key; set the Group Membership Attribute field to the attribute that the Zyxel Device is to check to determine to which group a user belongs. This example uses Class. This attribute's value is called a group identifier; it determines to which group a user belongs. In this example the values are Finance, Engineer, Sales, and Boss.

Figure 342 Configuration > Object > AAA Server > RADIUS > Add
Edit RADIUS radius General Settings Name: radius Description: (Optional) Authentication Server Settings Server Address: 172.16.1.200 (IP or FQDN) Authentication Port: 1812 (1-65535) Backup Server Address: (IP or FQDN) (Optional) Backup Authentication Port: (1-65535) (Optional) Key: •••• Change of Authorization Accounting Server Settings Server Address: (IP or FQDN) (Optional) Accounting Port: (1-65535) (Optional) Backup Server Address: (IP or FQDN) (Optional) Backup Accounting Port: (1-65535) (Optional) Key: Maximum retry count: 3 (1~10) Enable Accounting interim update Interim Interval: 10 (1-1440 minutes) General Server Settings Timeout: 5 (1-300 seconds) NAS IP Address: 127.0.0.1 (IP Address) NAS Identifier: Case-sensitive User Names User Login Settings Group Membership Attribute: Class(25) 25 OK Cancel

2 Now you add ext-group-user objects to identify groups based on the group identifier values. Set up one user account for each group of user accounts in the RADIUS server. Click Configuration > Object > User/Group > User. Click the Add icon.

Enter a user name and set the User Type to ext-group-user. In the Group Identifier field, enter Finance, Engineer, Sales, or Boss and set the Associated AAA Server Object to radius.

Figure 343 Configuration > Object > User/Group > User > Add
Add A User User Configuration User Name : Finance User Type: ext-group-user Group Identifier: Finance Associated AAA Server Object: radius Description: Local User Authentication Timeout Settings Use Default Settings Use Manual Settings Lease Time: 1440 minutes Reauthentication Time: 1440 minutes □ User VLAN ID: 1 (1-4094) OK Cancel

3 Repeat this process to set up the remaining groups of user accounts.

23.2.2 Authentication Type Screen

Use this screen to view, create and manage the authentication type profiles on the Zyxel Device. An authentication type profile decides which type of web authentication pages to be used for user authentication. Go to Configuration > Web Authentication and then select the Authentication Type tab to display the screen.

Figure 344 Configuration > Web Authentication > Authentication Type
Web Authentication SSO General Authentication Type Custom Web Portal File Custom User Agreement File Configuration Add Edit Remove Name Type Web Page 1 default-web-portal web-portal System Default Page 2 default-user-agreement user-agreement System Default Page Page 1 of 1 Show 50 Items Displaying 1 - 2 of 2 Reset

The following table describes the labels in this screen.

Table 195 Configuration > Web Authentication > Authentication Type

LABEL DESCRIPTION
AddClick this to create a new entry. Select an entry and click Add to create a new entry after the selected entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
# This field is a sequential value, and it is not associated with a specific entry.
Name This field displays the name of the profile.default-web-portal: the default login page built into the Zyxel Device.Note: You can also customize the default login page built into the Zyxel Device in the System > WWW > Login Page screen.default-user-agreement: the default user agreement page built into the Zyxel Device.
TypeThis field displays the type of the web authentication page used by this profile.
Web PageThis field displays whether this profile uses the default web authentication page built into the Zyxel Device (System Default Page) or custom web authentication pages from an external web server (External Page).
ResetClick Reset to return the screen to its last-saved settings.

Add/ Edit an Authentication Type Profile

Click the Add icon or select an entry in the Web Authentication > Authentication Type screen and click the Edit icon to display the screen. The screen differs depending on what you select in the Type field.

Figure 345 Configuration > Web Authentication > Authentication Type: Add/Edit (Web Portal)
Add Authentication Type Web Authentication Type Type: Web Portal User Agreement General Settings Profile Name: Internal Web Portal (User Upload Page) Preview: Please select one Note: If you want to configure customize file.please go to Custom Web Portal File Customize file: default_wp.zip External Web Portal Login URL: Logout URL: (Optional) Welcome URL: (Optional) Session URL: (Optional) Error URL: (Optional) Download the external web portal example. OK Cancel

Figure 346 Configuration > Web Authentication > Authentication Type: Add/Edit (User Agreement)
Add Authentication Type Web Authentication Type Type: Web Portal User Agreement General Settings Profile Name: Enable Idle Detection Idle timeout: 3 (1-60 minutes) Reauthentication Time: 0 (0-1440 minutes, 0 is unlimited) Internal User Agreement (User Upload Page) Preview: Please select one Note: If you want to configure customize file, please go to Custom User Agreement File Customize file: Please select one External User Agreement Agreement URL: Welcome URL: (Optional) Download the external user agreement example. OK Cancel

The following table describes the labels in this screen.

Table 196 Configuration > Web Authentication > Authentication Type: Add/Edit

LABEL DESCRIPTION
TypeSelect the type of the web authentication page through which users authenticate their connections.If you selectUser Agreement, by agreeing to the policy of user agreement, users can access the Internet without a guest account.
Profile Name Entera name for the profile.You can use up to 31 alphanumeric characters (A-Z, a-z, 0-9) and underscores (_). Spaces are not allowed. The first character must be a letter.
The following fields are available if you setType to Web Portal.
Internal Web PortalSelect this to use the web portal pages uploaded to the Zyxel Device.The login page appears whenever the web portal intercepts network traffic, preventing unauthorized users from gaining access to the network.
PreviewSelect to display the page you uploaded to the Zyxel Device in a new frame.Note: You must select a custom file uploaded to the Zyxel Device before you can preview the pages.
Customize fileSelect the file name of the web portal file in the Zyxel Device.Note: You can upload zipped custom web portal files to the Zyxel Device using theConfiguration >Web Authentication >Web Portal Customize File screen.
LABEL DESCRIPTION
External Web PortalSelect this to use a custom login page from an external web portal instead of the one uploaded to the Zyxel Device. You can configure the look and feel of the web portal page.
Login URLSpecify the login page's URL; for example, http://IIS server IP Address/login.html.The Internet Information Server (IIS) is the web server on which the web portal files are installed.
Logout URLSpecify the logout page's URL; for example, http://IIS server IP Address/logout.html.The Internet Information Server (IIS) is the web server on which the web portal files are installed.
Welcome URLSpecify the welcome page's URL; for example, http://IIS server IP Address/welcome.html.Users will be redirected to the welcome page after authentication. This field is optional.The Internet Information Server (IIS) is the web server on which the web portal files are installed.
Session URLSpecify the session page's URL; for example, http://IIS server IP Address/session.html.The Internet Information Server (IIS) is the web server on which the web portal files are installed.
Error URLSpecify the error page's URL; for example, http://IIS server IP Address/error.html.The Internet Information Server (IIS) is the web server on which the web portal files are installed.
Download Clickthis to download an example external web portal file for your reference.
The following fields are available if you set Type to User Agreement.
Enable Idle DetectionThis is applicable for access users.Select this check box if you want the Zyxel Device to monitor how long each access user is logged in and idle (in other words, there is no traffic for this access user). The Zyxel Device automatically logs out the access user once the Idle timeout has been reached.
Idle timeout This is applicable for access users.This field is effective when Enable Idle Detection is checked. Type the number of minutes each access user can be logged in and idle before the Zyxel Device automatically logs out the access user.
Reauthentication TimeEnter the number of minutes the user can be logged into the Zyxel Device in one session before having to log in again.
Internal User AgreementSelect this to use the user agreement pages in the Zyxel Device. The user agreement page appears whenever the Zyxel Device intercepts network traffic, preventing unauthorized users from gaining access to the network.
PreviewSelect to display the page you uploaded to the Zyxel Device in a new frame.Note: You must select a custom file uploaded to the Zyxel Device before you can preview the pages.
Customize file Select the file name of the user agreement file in the Zyxel Device.Note: You can upload zipped custom user agreement files to the Zyxel Device using the Configuration >Web Authentication >User Agreement Customize File screen.
External User AgreementSelect this to use custom user agreement pages from an external web server instead of the default one built into the Zyxel Device. You can configure the look and feel of the user agreement page.
Agreement URLSpecify the user agreement page's URL; for example, http://IIS server IP Address/logout.html.The Internet Information Server (IIS) is the web server on which the user agreement files are installed.
Welcome URLSpecify the welcome page's URL: for example, http://IIS server IP Address/welcome.html.The Internet Information Server (IIS) is the web server on which the user agreement files are installed.If you leave this field blank, the Zyxel Device will use the welcome page of internal user agreement file.
Download Clickthis to download an example external user agreement file for your reference.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

23.2.3 Custom Web Portal / User Agreement File Screen

Use this screen to upload the zipped custom web portal or user agreement files to the Zyxel Device. You can also download the custom files to your computer.

Click Configuration > Web Authentication and then select the Custom Web Portal File or Custom User Agreement File tab to display the screen.

Figure 347 Configuration > Web Authentication > Custom Web Portal File
Web Authentication SSO General Authentication Type Custom Web Portal File Custom User Agreement File Internal Web Portal Customize File Remove Download File Name Size Last Modified 1 default_wp.zip 553365 2018-01-18 13:15:16 Page 1 of 1 Show 50 items Displaying 1 - 1 of 1 Upload Internal Web Portal Customize File To upload a customize file, browse to the location of the file (.zip) and then click Upload. File Path: Select a File Path Browse... Upload Note: Download default_wp.zip for example. To upload customized web portal pages, browse to the location of the wp.zip file and then click upload.(Please keep welcome.html login.html logout.html session.html error.html file name and location.) Download External Web Portal Example Download

Figure 348 Configuration > Web Authentication > Custom User Agreement File
Web Authentication SSO General Authentication Type Custom Web Portal File Custom User Agreement File Internal User Agreement Customize File Remove Download File Name Size Last Modified 1 default_ua.zip 527000 2018-01-16 13:15:16 Page 1 of 1 Show 50 Items Displaying 1 - 1 of 1 Upload Internal User Agreement Customize File To upload a customize file, browse to the location of the file (.zip) and then click Upload. File Path: Select a File Path Browse... Upload Note: Download default_ua.zip for example. To upload customized user agreement pages, browse to the location of the ua.zip file and then click upload. (Please keep ua_agree.html, ua_welcome.html, ua.css file name and location.) Download External User Agreement Example Download

The following table describes the labels in this screen.

Table 197 Configuration > Web Authentication > Custom Web Portal / User Agreement File

LABEL DESCRIPTION
RemoveClick a file's row to select it and click Remove to delete it from the Zyxel Device.
DownloadClick a file's row to select it and click Download to save the zipped file to your computer.
#This column displays the index number for each file entry. This field is a sequential value, and it is not associated with a specific entry.
File NameThis column displays the label that identifies a web portal or user agreement file.
Size This column displays the size (in KB) of a file.
Last ModifiedThis column displays the date and time that the individual files were last changed or saved.
Browse / UploadClick Browse... to find the zipped file you want to upload, then click the Upload button to put it on the Zyxel Device.
DownloadClick this to download an example external web portal or user agreement file for your reference.

23.2.4 Facebook Wi-Fi Screen

The Zyxel Device supports Facebook Wi-Fi to let users check in to a business on Facebook for free Internet access after connecting to the Zyxel Device's wireless or LAN network. Users then have the option to like the Facebook fan page. This helps promote the Facebook page and then promote the business.

Use this screen to turn on Facebook Wi-Fi on the Zyxel Device and select a Facebook Page. You should already have:

  • connected the Zyxel Device to the Internet and registered the Zyxel Device with myZyxel.
  • set up a Facebook fan page associated with the business location.
  • created an authentication policy in the Configuration > Web Authentication: General screen to redirect the matched users to the Facebook page before they can have free Internet access.

Note: If you disable Facebook Wi-Fi or reset the Facebook page settings later, the Zyxel Device automatically logs out existing users who have authenticated their connections via Facebook Wi-Fi.

Click Configuration > Web Authentication and then select the Facebook Wi-Fi tab to display the following screen. If your Zyxel Device is not registered at myZyxel, the screen displays a message. Please register your device on portal.myZyxel.com to activate configure Facebook Wi-Fi. Click here to check register status.'

Figure 349 Configuration > Web Authentication: Facebook Wi-Fi
Web Authentication SSO General Authentication Type Custom Web Portal File Custom User Agreement File Facebook Wi-Fi General Settings Enable Facebook Wi-Fi Configure Reset FB Page Enable user idle detection User idle timeout: 10 (1-60 minutes) Note: 1. If you want to use Facebook Wi-Fi, Please go to Web Authentication policy summary. 2. For more information on setting up Facebook Wi-Fi for your business. Please visit Facebook help center. Apply Reset

The following table describes the labels in this screen.

Table 198 Configuration > Web Authentication: Facebook Wi-Fi

LABEL DESCRIPTION
Enable Facebook Wi-FiSelect the check box and clickApplyto turn on Facebook Wi-Fi on the Zyxel Device.
ConfigureClick this button to open the Facebook Wi-Fi configuration screen in a new window, where you can select the Facebook Page associated with your location and configure bypass mode and session length.Note: You should have registered your Zyxel Device with myZyxel before you can clickConfigureto set up Facebook Wi-Fi on the Zyxel Device.
Reset FB PageClick this button to remove your Facebook Page setting.
Enable user idle detectionSelect this check box if you want the Zyxel Device to monitor how long each user (authenticated via Facebook Wi-Fi) is idle (in other words, there is no traffic for this user).
User idle timeoutSpecify the User idle timeoutbetween 1 and 60 minutes. The Zyxel Device automatically disconnects a user (authenticated via Facebook Wi-Fi) from the network after a period of inactivity.
ApplyClickApplyto save your changes back to the Zyxel Device.
ResetClick Resetto return the screen to its last-saved settings.

23.2.4.1 How to Configure Facebook for Facebook Wi-Fi

This section shows you what to do if you have not yet set up a Facebook fan page and see the following message 'This device is not paired with facebook. Please configure this device'.

1 Click Configure.

General Settings Enable Facebook Wi-Fi Configure This device is not paired with facebook. Please configure this device. Asset Us Page Enable user idle detection User idle timeout: 10 (1-80 minutes) Note: 1. If you want to use Facebook WiFi, Please go to Web Authentication policy summary. 2. For more information on setting up facebook WiFi for your business. Please visit Facebook help center. Apply Reset

2 Log into Facebook and click Create Page.

Facebook Wi-Fi Configuration S122L23030003-1 You must have a compatible local business Page to continue. A compatible Page needs to be claimed and associated with a valid location. For more information, visit the Facebook Help Center. Create Page

3 Select the Facebook page type and fill in the information prompts to create a Facebook page. Then click Get Started.

Create a Page Give your brand, business or cause a voice on Facebook and connect with the people who matter to you. It's free to set up. Just choose a Page free to get started. Local Business or Place Happy Burger Fast Food Restaurant 1 fast lano Hsinchu, Taiwan 30099 578-3942 By clicking Get Started, you agree to the Facebook Pages Terms Get Started Company, Organization or Institution Brand or Product Artist, Band or Public Figure Entertainment Cause or Community

4 In the following screen, select the page just created and click Save Settings. Your Facebook page is now paired with Facebook Wi-Fi.

Facebook Wi-Fi Configuration S132L32200016 Facebook Page To use Facebook Wi-Fi you need to be the admin of a local business Page that has a valid location associated with it. Select a Page ▼ Bypass Mode Your customers always have the option to skip checking in. They can do this by clicking on a link that lets them skip check-in, or by entering a Wi-Fi code that you provide to them. Skip check-in link (?) Require Wi-Fi code (?) Session Length Select the length of time your customers will have Wi-Fi for after they check-in. Five hours ▼ Terms of Service Optional: Add your own Terms of Service (?) Visit Help Center Save Settings

23.2.4.2 How to use the Zyxel Device's Facebook Wi-Fi

This section shows how users use Facebook Wi-Fi to access the Internet for free after you enable and set up Facebook Wi-Fi on the Zyxel Device.

1 Connect to the Zyxel Device's wireless or LAN network.
2 Open a web browser from the connected computer or mobile device.

3 The Facebook Page you specified displays. By default, users can log in and check in to the location associated with the Facebook Page, or click a link to skip check-in. If you set Bypass Mode to Require Wi-Fi code in the Facebook Wi-Fi configuration screen, users need to enter the Wi-Fi password you provided.

facebook Sign Up Join or Log Into Facebook Email or Phone Password Forgot account? Log In Do you want to join Facebook? Sign Up ZyxelTest Check in on Facebook for free internet access To check in, sign up for Facebook today. Or click on the Skip Check-In link below. Sign Up Log In Skip Check-In By calling Facebook Wi-Fi, you understand and accept Facebook Wi-Fi Terms.

4 Users then can click Continue Browsing to surf the Internet through the Zyxel Device.

facebook Email or Phone Password Log In Forgot accounts? Congratulations, you're connected to free internet. Continue Browsing > Like Share Send Message Reviews ZyxelTest has no reviews yet Tell people what you think 0 people have been here ZyxelTest

23.3 SSO Overview

The SSO (Single Sign-On) function integrates Domain Controller and Zyxel Device authentication mechanisms, so that users just need to log in once (single login) to get access to permitted resources.

In the following figure, U user logs into a Domain Controller (DC) which passes the user's login credentials to the SSO agent. The SSO agent checks that these credentials are correct with the AD server, and if the AD server confirms so, the SSO then notifies the Zyxel Device to allow access for the user to the permitted resource (Internet access, for example).

Note: The Zyxel Device, the DC, the SSO agent and the AD server must all be in the same domain and be able to communicate with each other.

SSO does not support IPv6, LDAP or RADIUS; you must use it in an IPv4 network environment with Windows AD (Active Directory) authentication database.

You must enable Web Authentication in the Configuration > Web Authentication screen.

Figure 350 SSO Overview
ZYXEL USGFLEX700-GB0101F - SSO Overview - 1

flowchart
graph LR
    U["Computer U"] -->|IPv4 1| DC["DC"]
    DC -->|2| SSO["SSO"]
    SSO -->|3| AD/LDAP["AD/LDAP"]
    DC -->|4| AD/LDAP
    DC -->|5| Internet["Internet"]
    Internet -->|6| U
U User
DC Domain Controller
SSO Single Sign-On agent
AD Active Directory

Install the SSO Agent on one of the following platforms:

• Windows 7 Professional (32-bit and 64-bit)
• Windows Server 2008 Enterprise (32-bit and 64-bit)
• Windows 2008 R2 (64-bit)
• Windows Server 2012 (64-bit)

23.4 SSO - Zyxel Device Configuration

This section shows what you have to do on the Zyxel Device in order to use SSO.

Table 199 Zyxel Device - SSO Agent Field Mapping

ZYXEL DEVICE SSO
SCREEN FIELD SCREEN FIELD
Web Authentication >SSOListen Port Agent ConfigurationPage > Gateway SettingGateway Port
Web Authentication >SSOPrimary Agent Port Agent ConfigurationPageAgent Listening Port
Object >User/Group >User >AddGroup Identifier Agent ConfigurationPage > Configure LDAP/AD ServerGroup Membership
Object >AAA Server >Active Directory >AddBase DN Agent ConfigurationPage > Configure LDAP/AD ServerBase DN
Object >AAA Server >Active Directory >AddBind DN Agent ConfigurationPage > Configure LDAP/AD ServerBind DN
Object >User/Group >User >AddUser Name Agent ConfigurationPage > Configure LDAP/AD ServerLogin Name Attribute
Object >AAA Server >Active Directory >AddServer AddressAgent Configuration Page > Configure LDAP/AD ServerServer Address
Network >Interface >Ethernet >wan (IPv4)IP addressAgent Configuration Page > Gateway SettingGateway IP

23.4.1 Configuration Overview

These are the screens you need to configure:

  • Configure the Zyxel Device to Communicate with SSO on page 504
  • Enable Web Authentication on page 505
    • Create a Security Policy on page 506
  • Configure User Information on page 507
  • Configure an Authentication Method on page 508
  • Configure Active Directory on page 509 or Configure Active Directory on page 509

23.4.2 Configure the Zyxel Device to Communicate with SSO

Use Configuration > Web Authentication > SSO to configure how the Zyxel Device communicates with the Single Sign-On (SSO) agent.

Figure 351 Configuration > Web Authentication > SSO
Web Authentication SSO General Settings Listen Port: 2158 (1025-65535) Agent PreShareKey: Primary Agent: Primary Agent Port: (1025-65535) Secondary Agent (Optional): Secondary Agent Port (Optional): (1025-65535) Note: If you use Re-auth., please enable "Web Authentication" in Web Authentication. Apply Reset

The following table gives an overview of the objects you can configure.

Table 200 Configuration > Web Authentication > SSO

LABEL DESCRIPTION
Listen PortThe default agent listening port is 2158. If you change it on the Zyxel Device, then change it to the same number in the Gateway Port field on the SSO agent too. Type a number ranging from 1025 to 65535.
Agent PreShareKeyType 8-32 printable ASCII characters or exactly 32 hex characters (0-9; a-f). The Agent PreShareKey is used to encrypt communications between the Zyxel Device and the SSO agent.
Primary AgentType the IPv4 address of the SSO agent. The Zyxel Device and the SSO agent must be in the same domain and be able to communicate with each other.
Primary Agent PortType the same port number here as in the Agent Listening Port field on the SSO agent. Type a number ranging from 1025 to 65535.

Table 200 Configuration > Web Authentication > SSO

LABEL DESCRIPTION
Secondary Agent Address(Optional)Type the IPv4 address of the backup SSO agent if there is one. The Zyxel Device and the backup SSO agent must be in the same domain and be able to communicate with each other.
Secondary Agent Port(Optional)Type the same port number here as in theAgent Listening Portfield on the backup SSO agent if there is one. Type a number ranging from 1025 to 65535.
ApplyClick this button to save your changes to the Zyxel Device.
Reset Click this button to returnthe screen to its last-saved settings

23.4.3 Enable Web Authentication

Enable Web Authentication and add a web authentication policy.

Web Authentication SSO General Authentication Type Custom Web Portal File Custom User Agreement File Global Setting Enable Web Authentication Web Portal General Setting Enable Session Page Logout IP: 1.1.1.1 User Agreement General Setting Enforce data collection Exceptional Services Add Remove Exceptional Services 1 DNS Page 1 of 1 Show 50 Items Displaying 1 - 1 of 1 Web Authentication Policy Summary Add Edit Remove Activate Inactivate Move Priority Incoming Interface Source Destin... Sched... Authentication Authentication Type Desri... 1 I any any any none SSO/force default-web-portal default.. 2 Default any any any none unnecessary n/a n/a Page 1 of 1 Show 50 Items Displaying 1 - 2 of 2 Apply Reset

Make sure you select Enable Policy, Single Sign-On and choose required in Authentication.

Do NOT select any as the source address unless you want all incoming connections to be authenticated!

Auth. Policy Add Create new Object General Settings Enable Policy Description: (Optional) User Authentication Policy Incoming Interface: any Source Address: LAN1 SUBNET Destination Address: any Schedule: none Authentication: required Single Sign-on Force User Authentication Authentication Type: default-web-porta OK Cancel

See Table 193 on page 483 and Table 194 on page 486 for more information on configuring these screens.

23.4.4 Create a Security Policy

Configure a Security Policy for SSO traffic source and destination direction in order to prevent the security policy from blocking this traffic. Go to Configuration > Security Policy > Policy Control and add a new policy if a default one does not cover the SSO web authentication traffic direction.

Policy Hide Filter General Settings Enable Policy Control IPv4 Configuration Form: any Service: any To: any User: any IPv4 Source: Schedule: IPv4 Destination: Search Reset Allow Asymmetrical Route + Add Edit Remove Activate Inactivate Move Clone Address... Name Form To IPv4 S... IPv4 D... Service User Sched... A... Log Profile 1 LAN1_Outg... LAN1 any [E... any any any any any none al... no 2 LAN2_Outg... LAN2 any [E... any any any any any none al... no 3 DM7_to_WAN DM2 WAN any any any any any none al... no 4 IPSec_VPN... IPSec... any [E... any any any any none al... no 5 SSL_VPN_O... SSL_V... any [E... any any any any none al... no 6 TUNNEL_Out... TUNNEL any [E... any any any any none al... no 7 LAN1_to_D... LAN1 ZyWALL any any any any none al... no 8 LAN2_to_D... LAN2 ZyWALL any any any any none al... no 9 DMZ_to_De... DMZ ZyWALL any any Defo... any none al... no 10 WAN_to_De... WAN ZyWALL any any Defo... any none al... no 11 IPSec_VPN... IPSec... ZyWALL any any any any none al... no 12 SSL_VPN_to SSL_V ZyWALL any any any any none al... no

Configure the fields as shown in the following screen. Configure the source and destination addresses according to the SSO web authentication traffic in your network.

Add corresponding Create new Object Enable Name: MySSOSecurePolicy Description: From: any To: any (Excluding ZyV) Source: LAN1_SUBNET Destination: any Service: SSO User: any Schedule: none Action: allow Log matched traffic: no OK Cancel

23.4.5 Configure User Information

Configure a User account of the ext-group-user type.

User Group Setting MAC Address Configuration Add Edit Remove Object References User Name User Type Description Reference 1 admin admin Administration account 1 2 Idap-users ext-user External LDAP Users 0 3 radius-users ext-user External RADIUS Users 0 4 ad-users ext-user External AD Users 0 5 ua-users dynamic-guest User Agreement Users 0 6 Leo ext-user Leo 0 Page 1 of 1 Show 50 Items Displaying 1 - 6 of 6

Configure Group Identifier to be the same as Group Membership on the SSO agent.

Add A User User Configuration User Name : User Type: Group Identifier: exl-group-user Associated AAA Server Object: ad Description: SSO User Authentication Timeout Settings Use Default Settings Lease Time: 1440 minutes Reauthentication Time: 1440 minutes User VLAN ID: 1 (1-4074) Use Manual Settings Configuration Validation Please enter a user account existed in the configured group to validate above settings. User Name : Test OK Cancel

23.4.6 Configure an Authentication Method

Configure Active Directory (AD) for authentication with SSO.

Authentication Method Configuration Add Edit Remove Object References Method Name Method List I default local Page 1 of 1 Show 50 Items Displaying 1 - 1 of 1

Choose group ad as the authentication server for SSO.

Add Authentication Method General Settings Name: Add Edit Remove Move Method List 1 local group ad group ldap group radius group New OK Cancel

23.4.7 Configure Active Directory

You must configure an Active Directory (AD) server in AAA Setup to be the same as AD configured on the SSO agent.

Active Directory LDAP RADIUS AD Server Summary + Add Edit Remove Object References Name Server Address Base DN 1 ad Page 1 of 1 Show 50 items Displaying 1 - 1 of 1

The default AD server port is 389. If you change this, make sure you make the same changes on the SSO. Configure the Base DN exactly the same as on the Domain Controller and SSO. Bind DN is a user name and password that allows the Zyxel Device to join the domain with administrative privileges. It is a required field.

Add Active Directory General Settings Name: New Description: (Optional) Server Settings Server Address: (IP or FQDN) Backup Server Address: (IP or FQDN)(Optional) Port: 389 (1-65535) Base DN: Use SSL Search time limit: 5 (1-300 seconds) Case-sensitive User Names Server Authentication Bind DN: Password: Retype to Confirm: User Login Settings Login Name Attribute: sAMAccountName Alternative Login Name Attribute: (Optional) Group Membership Attribute: memberOf Domain Authentication for MSChap Enable User Name: User Password: Retype to Confirm: Realm: NetBIOS Name: Configuration Validation Please enter an existing user account in this server to validate the above settings. Username: OK Cancel

23.5 SSO Agent Configuration

This section shows what you have to do on the SSO agent in order to work with the Zyxel Device.

After you install the SSO agent, you will see an icon in the system tray (bottom right of the screen)

Recycle Bin SSDAgent... First ExE-mail ExE-mail: W... SSA_agent1 @-ssc_agent1 - Paint 下午03:05

Right-click the SSO icon and select Configure Zyxel SSO Agent.

Recycle Bin SSOAgent_2 Final PreInstall Printed Web... Save Agent_1 Disable ZyXEL SSO Agent Configure ZyXEL SSO Agent Log Logon user lists Diagnostic tools Change Service Setting Help About ZyXEL SSO Agent sso_agent_2 - Print ZyxEL SSO Agent Us...

Configure the Agent Listening Port, AD server exactly as you have done on the Zyxel Device. Add the Zyxel Device IP address as the Gateway. Make sure the Zyxel Device and SSO agent are able to communicate with each other.

Agent Configuration Page General Setting: Agent Listening Port: 2158 (1025 - 65535) Logon List Check Interval (minute): 30 (10 - 1440) Check Now Configure LDAP/AD server Configure Gateway Settings Add Modify Delete Active Index Description IP Fort Share Key ✓ 1 test 192.168.1.1 2158 ******** OK Cancel

Configure the Server Address, Port, Base DN, Bind DN, Login Name Attribute and Group Membership for the AD server settings exactly as you have done on the Zyxel Device. Group Membership is called Group Identifier on the Zyxel Device.

LDAP/AD Server Configuration

LDAP/AD server configuration General Settings Name as server Description Server Settings Server Address 152.168.1.220 Backup Server Address Port 389 Base DN dc=sso.dc=win2012,dc=com Use SSL Search time limit 5 Server Authentication Bind DN agent Password ••• Retype to Confirm ••• User Settings Group Membership Attribute memberOf Configuration Validation Please enter the existing user account in this server to validate the above settings Username Test OK Cancel

Configure the Gateway IP address, Gateway Port and PreShareKey exactly as you have done in the Zyxel Device Configuration > Web Authentication > SSO screen. If you want to use Generate Key to have the SSO create a random password, select Check to show PreShareKey as clear Text so as to see the password, then copy and paste it to the Zyxel Device.

Gateway Setting Gateway IP: | Gateway Port 2158 (1025 - 65535) Description PreShareKey IPv4 Address Generate Key Check to show PreShareKey as clear Text OK Cancel

After all SSO agent configurations are done, right-click the SSO icon in the system tray and select Enable Zyxel SSO Agent.

Recycle Bin SSO Agent 2 SSOAgent... sio agent 3 File... sio agent 5 Fidical Internet We... Bio Layer 1 Bio Layer 4 sio agent 5 - Paint ZyXIL SSD Agent Us... Enable ZyXIL SSD Agent Configure ZyXIL SSD Agent Log Logon user lists Diagnostic tools Change Service Setting Help About ZyXIL SSD Agent

CHAPTER 24 Hotspot

24.1 Overview

See Section 1.1.1 on page 27 to see which models support Hotspot management.

24.2 Billing Overview

You can use the built-in billing function to setup billing profiles. A billing profile describes how to charge users. This chapter also shows you how to select an accounting method, configure a discount price plan or use an online payment service by credit card.

  • Use the General screen (see Section 24.3 on page 514) to configure the general billing settings, such as the accounting method, currency unit and the SSID profiles to which the settings are applied.
  • Use the Billing Profile screen (see Section 24.4 on page 516) to configure the billing profiles for the web-based account generator and each button on the connected statement printer.
  • Use the Discount screen (see Section 24.5 on page 523) to enable and configure discount price plans.
  • Use the Payment Service screen (see Section 24.6 on page 525) to enable online payment service and configure the service pages.

24.2.1 What You Need to Know

Accumulation Accounting Method

The accumulation accounting method allows multiple re-logins until the allocated time period or until the user account is expired. The Zyxel Device accounts the time that the user is logged in for Internet access.

Time-to-finish Accounting Method

The time-to-finish accounting method is good for one-time logins. Once a user logs in, the Zyxel Device stores the IP address of the user's computer for the duration of the time allocated. Thus the user does not have to enter the user name and password again for re-login within the allocated time. Once activated, the user account is valid until the allocated time is reached even if the user disconnects Internet access for a certain period within the allocated time. For example, Joe purchases a one-hour time-to-finish account. He starts using the Internet for the first 20 minutes and then disconnects his Internet access to go to a 20-minute meeting. After the meeting, he only has 20 minutes left on his account.

24.3 The Billing > General Screen

Use this screen to configure the general billing settings, such as the accounting method, currency unit and the SSID profiles to which the settings are applied. Click Configuration > Hotspot > Billing > General to open the following screen.

Figure 352 Configuration > Hotspot > Billing > General
General Billing Profile Discount Payment Service General Settings Unused account will be deleted after the time: 24 hour Accounting Method Time to Finish Accumulation User idle timeout: 3 (1-60 minutes) Accumulation account will be deleted after the time: 90 day Billing User Logon Settings Maximum number per billing account: 1 (1-10) Reach maximum number per billing account: Block Remove previous user and login Username & Password length: 6 Keep user logged in Replenish Service Currency Currency # Currency symbol € Currency code User-Define Number of decimals places: 2 Decimal symbol: comma Tax 0 % SSID Profile Settings Selectable SSID Profiles --- Object --- default ssid Selected SSID Profiles Hotspot Service Status Service Status: Not Activated Buy Activate Apply Reset

The following table describes the labels in this screen.

Table 201 Configuration > Hotspot > Billing > General

LABEL DESCRIPTION
General Settings
Unused account will be deleted after the time:Enter the number and select a time unit from the drop-down list box to specify how long to wait before the Zyxel Device deletes an account that has not been used.
Accounting MethodSelect Time to Finish to allow each user a one-time login. Once the user logs in, the system starts counting down the pre-defined usage even if the user stops the Internet access before the time period is finished. If a user disconnects and reconnects before the allocated time expires, the user does not have to enter the user name and password to access the Internet again.Select Accumulation to allow each user multiple re-login until the time allocated is used up. The Zyxel Device accounts the time that the user is logged in for Internet access.
User idle timeoutThe Zyxel Device automatically disconnects a computer from the network after a period of inactivity. The user may need to enter the username and password again before access to the network is allowed.If you select Accumulation, specify the idle timeout between 1 and 60 minutes.
Accumulation account will be deleted after the time:Enter the number and select a time unit from the drop-down list box to specify how long to wait before the Zyxel Device deletes the account.This is for use with accumulation accounting.
Billing User Logon Settings
Maximum number per billing accountEnter the maximum number of the users that are allowed to log in with the same account.
Reach maximum number per billing accountSelect Block to stop new users from logging in when the Maximum number per billing account is reached.Select Remove previous user and login to disassociate the first user that logged in and allow new user to log in when the Maximum number per billing account is reached.
Username & Password lengthSelect to specify how many characters the username and password of a newly-created dynamic guest account will have after you click Apply.
Keep user logged inSelect to let the users automatically log in without entering their user name and password if the Zyxel Device restarts.Note: This works only for free guest accounts or when the accounting method is Time to Finish.
CurrencySelect the appropriate currency symbol or currency unit.If you set Currency code to User-Define, enter a three-letter alphabetic code manually.
Number of decimals placesThis shows the number of decimal places to be used for billing.
Decimal symbolSelect whether you would like to use a dot (.) or a comma (.) for the decimal point.
TaxSelect this option to charge sales tax for the account. Enter the tax rate (a 6% sales tax is entered as 6).
SSID Profile SettingsThe Selectable SSID Profiles list displays the name(s) of the SSID profile(s) to which you can apply the general billing settings.To apply settings to an SSID profile, you can double-click a single entry to move it or use the [Shift] or [Ctrl] key to select multiple entries and click the right arrow button to add to the Selected SSID Profiles list. To remove an SSID profile, select the name(s) in the Selected SSID Profiles list and click the left arrow button.
Hotspot Service Status
Service StatusThis field displays whether a service license is enabled at myZyxel (Activated) or not (Not Activated) or expired (Expired). It displays the remaining Grace Period if your license has Expired. It displays Not Licensed if there isn't a license to be activated for this service.If you need a license or a trial license has expired, click Buy to buy a new one. If a Standard license has expired, click Renew to extend the license.Then, click Activate to connect with the myZyxel server to activate the new license.
Service TypeThis shows whether you have a trial or standard license or none (Trial, Standard, None).
Expiration DateThis shows when your hotspot license will expire.
Apply Click this button to save your changes to the Zyxel Device.
Reset Click this button to return the screen to its last-saved settings.

24.4 The Billing > Billing Profile Screen

Use this screen to configure the billing profiles that defines the maximum Internet access time and charge per time unit. Click Configuration > Hotspot > Billing > Billing Profile to open the following screen.

Figure 353 Configuration > Hotspot > Billing > Billing Profile
General Billing Profile Discount Payment Service Account Generator Settings Button A: billing_30mins Button B: billing_30mins Button C: billing_30mins Preview Billing Profile Add Edit Remove Activate Inactivate Status Name Time Period Quota (T / U / D) Bandwidth (U / D) Price 1 billing_30mins 30 minute unlimited / - / - unlimited / unlimited € 0,00 H Page 1 of 1 Show 50 Items Displaying 1 - 1 of 1 Apply Reset

The following table describes the labels in this screen.

Table 202 Configuration > Hotspot > Billing > Billing Profile

LABEL DESCRIPTION
Account Generator Settings
Button A ~ CSelect a billing profile for each button of the web-based account generator. The buttons correspond to the buttons on a connected statement printer.
LABELDESCRIPTION
PreviewClick this button to open the Account Generator screen, where you can generate a dynamic guest account and print the account information using a statement printer connected to the Zyxel Device (see Section 24.4.1 on page 517 for more information).
Billing Profile
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
# This field is a sequential value, and it is not associated with a specific entry.
Status This icon is lit when the entry is active and dimmed when the entry is inactive.
Name This field displays the descriptive profile name for this entry.
Time Period This field displays the duration of the billing period.
Quota (T/U/D)This field is NOT available when you set Accounting Method to Time to Finish in the Billing > General screen.This field displays how much data in both directions (Total) or upstream data (Upload) and downstream data (Download) can be transmitted through the WAN interface before the account expires.
Bandwidth (U/D)This field displays the maximum upstream (Upload) and downstream (Download) bandwidth allowed for the user account in kilobits per second.
Price This field displays each profile's price per time unit.
Apply Click this button to save your changes to the Zyxel Device.
Reset Click this button to return the screen to its last-saved settings.

24.4.1 The Account Generator Screen

The Account Generator screen allows you to automatically create dynamic guest accounts (see Dynamic-Guest Accounts for more information on dynamic guest accounts).

Click Configuration > Hotspot > Billing > Billing Profile and then the Preview button to open this screen. You can also open this screen by logging into the Web Configurator with the guest-manager account.

Figure 354 Account Generator
Account Generator Account Generator Account Redemption Account Generator Settings Button... Selection Service Name Time Period Quota (T / U / D) Bandwidth (U / D) Price A billing_30mins 30 minute unlimited / - / - unlimited / unlimited € 0.00 B billing_30mins 30 minute unlimited / - / - unlimited / unlimited € 0.00 C billing_30mins 30 minute unlimited / - / - unlimited / unlimited € 0.00 Button A Unit: 1 Customer Information Real Name: [Optional] Email: [Optional] Phone Number: (Optional) Default Thermal Printer Printer: Local Printer Summary Total: € 0.00 Tax: 0% Grand Total: € 0.00 Quantity: 1 (1-50) Generate Cancel

The following table describes the labels in this screen.

Table 203 Account Generator

LABEL DESCRIPTION
Account Generator SettingsSelect a button and specify how many units of billing period to be charged for new account in the Button x Unit field.
Discount plan for Button xThis section displays only when you enable the discount price plan in the Billing > Discount screen.
# This is the numberof each discount level.The default (first) level cannot be edited or deleted. It is created automatically according to the billing profile of the button you select.
NameThis field displays the conditions of each discount level.
UnitThis field displays the duration of the billing period that should be reached before the Zyxel Device charges users at this level.
Price This field displays the price per time unit for each level.
Customer Information
Real Name Enter the user's name.
Email Enter the user's email address.
Phone NumberEnter the user's phone number.
LABEL DESCRIPTION
Default Thermal PrinterSelect a statement printer that is attached to the Zyxel Device. It displays n/a if there is no printer attached.
Summary
TotalThis shows the total price for the account before sales tax is added.
Tax This shows the tax rate.
Grand Total This shows the total price including tax.
Quantity Specify the number of account to be created.
GenerateClick Generate to generate an account based on the billing settings you configure for the selected button in the Billing Profile screen. A window displays showing the SMS message and/or a printout preview of the account generated.
CancelClick Cancel to exit this screen without saving.
LogoutClick Logout to log out of the web configurator. This button is available only when you open this screen by logging in with the guest-manager account.

The following figure shows an example SMS message with account information. The SMS screen displays only when you enable SMS in the Configuration > System > Notification > SMS screen. You can enter the user's mobile phone number and click Send SMS to send the account information in an SMS text message to the user's mobile phone. Click Cancel to close this window when you are finished viewing it.

Account Generator SMS Printer SMS Content Username:g7kqua Password:nhj7mr Activate account before 2014-04-17 09:24 Send SMS Country Code: 886 Mobile Number: 0912345678 Example: [886][0910123456] (for Taiwan) Send SMS Cancel Printer

The Printer screen shows a printout preview example. Click Printer to print this subscriber statement. Click Cancel to close this window when you are finished viewing it.

Account Generator SMS Printer Welcome! Hotspot internet access service Username: m2w3ii Password: rkq5zq Real Name: Email: Phone: Billing: time-to-finish Service: billing_30mins Unit: 1 Time Period: 30 minute Total Quota: - Upload Quota: - Download Quota: - Upload Bandwidth: - Download Bandwidth: - Total: € 0,00 Tox: 0,0 % Grand Total: € 0,00 Wlan1 ESSID: security: Key: Wlan2 ESSID: security: Key: Printout time: 2019-03-21 13 ;42 Please activate your account before 2018-03-22 13:43 Thank you very much! Printer Cancel

24.4.2 The Account Redeem Screen

The Account Redeem screen allows you to send SMS messages for certain accounts. Click the Account Redeem tab in the Account Generator screen to open this screen.

Figure 355 Account Redeem
Account Generator Account Generator Account Redeem Query Account Information Phone Number: 09 - 123456 Query SMS Status Username Create Time Remaining Ti... Time Per Expiration Time Charge Payment I... Phone N... Page 1 of 1 Show 50 items No data to display Cancel

The following table describes the labels in this screen.

Table 204 Account Redeem

LABEL DESCRIPTION
Query Account Information
Phone NumberEnter the country code and mobile phone number and click Query to display only the account(s) that has the specified phone number.
SMSClick this button to send text messages for the accounts in the list below.You can use this button only when SMS is enabled and there is at least one account in the list.
# This is the index number of the dynamic guest account in the list.
Status This field displays whether an account expires or not.
Username This field displays the user name of the account.
Create Time This field displays when the account was created.
Remaining TimeThis field displays the amount of Internet access time remaining for each account.
Time PeriodThis field displays the total account of time the account can use to access the Internet through the Zyxel Device.
Expiration TimeThis field displays the date and time the account becomes invalid.Note: Once the time allocated to a dynamic account is used up or a dynamic account remains unused after the expiration time, the account is deleted from the account list.
Charge This field displays the total cost of the account.
Payment Info This field displays the method of payment for each account.
Phone NumThis field displays the mobile phone number for the account.
CancelClick Cancel to exit this screen without saving.
LogoutClick Logout to log out of the web configurator. This button is available only when you open this screen by logging in with the guest-manager account.

24.4.3 The Billing Profile Add/Edit Screen

The Billing Profile Add/Edit screen allows you to create a new billing profile or edit an existing one. Click Configuration > Hotspot > Billing > Billing Profile and then an Add or Edit icon to open this screen.

Figure 356 Configuration > Hotspot > Billing > Billing Profile > Add/Edit
Billing Profile General Settings Enable billing profile Name: Price: Time Period Setting Time Period: minute (0 is unlimited) Quota Settings Quota Type: Total Upload / Download Total Quota: MB (0-1023 MB, 0 is unlimited) Bandwidth Settings Enable Bandwidth Upload: 0 kbps (0 is unlimited) Priority: 4 Download: 0 kbps (0 is unlimited) Priority: 4 OK Cancel

The following table describes the labels in this screen.

Table 205 Configuration > Hotspot > Billing > Billing Profile > Add/Edit

LABEL DESCRIPTION
Enable billing profileSelect this option to activate the profile.
Name Enter a name for the billing profile.You can use up to 31 alphanumeric characters (A-Z, a-z, 0-9) and underscores (_). Spaces are not allowed. The first character must be a letter.
Price Define each profile's price, up to 999999.99, per time unit.
Time PeriodSet the duration of the billing period (minute, hour, or day). When this period expires, the user's access will be stopped. The allowed time period ranges are 10 to 60 minutes, 0 to 24 hours, or 0 to 365 days.
Quota TypeThe quota settings section is NOT available when you set Accounting Method to Time to Finish in the Billing > General screen.Set a limit for the user accounts. This only applies to user's traffic that is received or transmitted through the WAN interface.Note: When the limit is exceeded, the user is not allowed to access the Internet through the Zyxel Device.Select Total to set a limit on the total traffic in both directions.Select Upload/ Download to set a limit on the upstream traffic and downstream traffic respectively.
Total QuotaIf you select Total, specify how much downstream and/or upstream data (in MB (Megabytes) or GB (Gigabytes)) can be transmitted through the WAN interface before the account expires.0 means there is no data limit for the user account.
Upload QuotaIf you select Upload/Download, specify how much upstream data (in MB (Megabytes) or GB (Gigabytes)) can be transmitted through the WAN interface before the account expires.0 means there is no data limit for the user account.
Download QuotaIf you select Upload/Download, specify how much downstream data (in MB (Megabytes) or GB (Gigabytes)) can be transmitted through the WAN interface before the account expires.0 means there is no data limit for the user account.
Enable BandwidthSelect this option to turn on bandwidth management for the user accounts.
UploadSpecify the maximum outgoing bandwidth allowed for the user account in kilobits per second. Upload refers to the traffic the Zyxel Device sends out from a user.
DownloadSpecify the maximum incoming bandwidth allowed for the user account in kilobits per second. Download refers to the traffic the Zyxel Device sends to a user.
PriorityEnter a number between 1 and 7 to set the priority for the user's traffic. The smaller the number, the higher the priority.Traffic with a higher priority is given bandwidth before traffic with a lower priority.Note: The priority setting here has priority over the priority setting in a bandwidth management rule.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

24.5 The Billing > Discount Screen

Use this screen to configure a custom discount pricing plan. This is useful for providing reduced rates for purchases of longer periods of time. You can charge higher rates per unit at lower levels (fewer units purchased) and lower rates per unit at higher levels (more units purchased). Click Configuration > Hotspot > Billing > Discount to open the following screen.

Note: The discount price plan does not apply to users who purchase access time online with a credit card.

Figure 357 Configuration > Hotspot > Billing > Discount
General Billing Profile Discount Payment Service Discount Settings Enable Discount Button Select: Button A Charge by levels Discount Price Plan Add Edit Remove Name Unit Price d... when >= 1 $2 1 when >= 3 $1.9 2 when >= 5 $1.8 Page 1 of 1 Show 50 items Displaying 1 - 3 of 3 Apply Reset

The following table describes the labels in this screen.

Table 206 Configuration > Hotspot > Billing > Discount

LABEL DESCRIPTION
Discount Settings
Enable Discount Select the check box to activate the discount price plan.
Button SelectSelect a button from the drop-down list box to assign the base charge.
Charge by levelsSelect this to charge the rate at each successive level from the first level (most expensive per unit) to the highest level (least expensive per unit) that the total purchase reaches.Otherwise, clear this to charge all of the user's time units only at the highest level (least expensive) that their total purchase reaches.
Discount Price Plan
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
# This is the number of each discount level.The default (first) level cannot be edited or deleted. It is created automatically according to the billing profile of the button you select.
NameThis field displays the conditions of each discount level.
UnitThis field displays the duration of the billing period that should be reached before the Zyxel Device charges users at this level.
Price This field displays the price per time unit for each level.
Apply Click this button to save your changes to the Zyxel Device.
Reset Click this button to return the screen to its last-saved settings.

24.5.1 The Discount Add/Edit Screen

The Discount Add/Edit screen allows you to create a new discount level or edit an existing one. Click Configuration > Hotspot > Billing > Discount and then an Add or Edit icon to open this screen.

Figure 358 Configuration > Hotspot > Billing > Discount > Add/Edit
Add Discount Settings Name: when >= Unit: Price:

The following table describes the labels in this screen.

Table 207 Configuration > Hotspot > Billing > Discount > Add/Edit

LABEL DESCRIPTION
NameThis field displays the conditions of each discount level.
UnitSet the duration of the billing period that should be reached before the Zyxel Device charges users at this level.
Price Define this level's charge per time unit.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

24.6 The Billing > Payment Service Screen

Use this screen to use a credit card service to authorize, process, and manage credit card transactions directly through the Internet. You must register with the supported credit card service before you can configure the Zyxel Device to handle credit card transactions. Click Configuration > Hotspot > Billing > Payment Service to open the following screen.

Figure 359 Configuration > Hotspot > Billing > Payment Service > General
General Billing Profile Discount Payment Service General Desktop View Mobile View General Setting Enable Payment Service Payment Provider Selection Account: Currency: Euro(EUR) Identity Token: Payment Gateway: https://www.paypal.com/cgi-bin/webscr Account Delivery Method Delivery Method: On-Screen and SMS Warning: SMS function is inactivate. Apply Reset

The following table describes the labels in this screen.

Table 208 Configuration > Hotspot > Billing > Payment Service > General

LABEL DESCRIPTION
General Setting
Enable Payment ServiceSelect the check box to use PayPal to authorize credit card payments.Note: After you set up web authentication policies and enable the online payment service on the Zyxel Device, a link displays in the login screen when users try to access the Internet. The link redirects users to a screen where they can make online payments by credit card to purchase access time and get dynamic guest account information.
Payment Provider Selection
Account You should already have a PayPal account to receive credit card payments.Enter your PayPal account name.
CurrencySelect the currency in which payments are made. The available options depend on currencies that PayPal supports.
Identity TokenEnter the ID token provided to you by PayPal after successfully applying for your PayPal account.
Payment GatewayEnter the address of the PayPal gateway provided to you by PayPal after applying for your PayPal account.
Account Delivery Method
LABEL DESCRIPTION
Delivery MethodSpecify how the Zyxel Device provides dynamic guest account information after the user's online payment is done.Select On-Screen to display the user account information in the web screen.Select SMS to use Short Message Service (SMS) to send account information in a text message to the user's mobile device.Select On-Screen and SMS to provide the account information both in the web screen and via SMS text messages.Note: You should have enabled SMS in theConfiguration > System > Notification > SMS screen to send text messages to the user's mobile device.
Apply Click this button to save your changes to the Zyxel Device.
Reset Click this button to return the screen to its last-saved settings.

24.6.1 The Payment Service > Desktop / Mobile View Screen

Use this screen to customize the online payment service pages that displays after an unauthorized user clicks the link in the Web Configurator login screen to purchase access time. You can configure both the desktop and mobile versions of the service pages. Users click a link in the pages to switch between the two versions.

Click Configuration > Hotspot > Billing > Payment Service > Desktop View or Mobile View to open the following screen.

Figure 360 Configuration > Hotspot > Billing > Payment Service > Desktop View
General Miling Profile Discounts Payment Service General Desktop View PCB Site Select Type Use Default Page Use Customized Page Customized Profile Selection Page Start Date: September Show user account data from the following page (12.3) Welcome Please choose from the following service selection: Service Name Time Period Charge Quantity 1 AAA 2 Hour $ 23 1 # 2 AAA 2 Hour $ 23 1 # 3 AAA 2 Hour $ 23 1 # 4 AAA 2 Hour $ 23 1 # 5 AAA 2 Hour $ 23 1 # 6 AAA 2 Hour $ 23 1 # OK Customized Sustainality Page Access to the website Sustainable Password SUPPORTS FILE & Print For your Internet Service Sparks Note Account Password This is your account information, please keep this for your internet service. Your usernames XXXX Your password < XXXX Your time period is 0 day, 00 how 30 minutes Please activate your account before 28/03/2012, 23:00:00 Customized Full Page 1. Add Software Import full page with a link to your account in account at this time. Welcome Sorry, We can't handle your payment transaction at this time. Go to Partial and check your account. Customized Shifts Page Login Options Choose to use mobile phone or the account information. Welcome Please check your mobile phone for the account information. Apply Reset

Figure 361 Configuration > Hotspot > Billing > Payment Service > Mobile View
General Listing profile Discount Payment Service General Desktop View Mobile View Select Type Use Default Page Use Customized Page Customized Profile Selections Page Selection Message: Please choose the service plan from the following profile table. Rack ZyXEL Please choose the service plan from the following profile table. Time Schedule Change 60ms 100ms 47.00 100.00 24hr unlimited €3.00 Next View Setup Versus ZyXEL Successfully Welcome, you may have use the internet. IMPORTANT! IMPORTANT!MAKE a note for your case-sensitive username and password for logging jobs. This will be your only opportunity to do so. Your username: 13qxs3 Your password: zei0mk Your time posted: 30 minutes Please include your account before: 26/04/2014, 23:00:00 Login Now Customized Successfully Page Successfully Message: you may now use the Internet. Notification Message: IMPORTANT!MAKE a note for your case-sensitive notification Color: red Color - CSS color code Customized Fail Page Failed Request: Sorry We can't handle your payment transaction at this time. ZyXEL Fail Bonal! Sorry We can't handle your payment transaction at this time. Fixation: Invalid operation: You can go PayPal and check your account. OK Go to PayPal Customized SMS Page Information Message: Please check your mobile phone for the account information. ZyXEL SMS Message Please check your mobile phone to the account information. OK Apply Reset

The following table describes the labels in this screen.

Table 209 Configuration > Hotspot > Billing > Payment Service > Desktop View or Mobile View

LABEL DESCRIPTION
Select Type
Use Default PageSelect this to use the default online payment service page built into the device. If you later create a custom online payment service page, you can still return to the Zyxel Device's default page as it is saved indefinitely.
Use Customized PageSelect this to use a custom online payment service page instead of the default one built into the Zyxel Device. Once this option is selected, the custom page controls below become active.
Customized Profile Selection Page
Selection MessageEnter a note to display in the first welcome page that allows users to choose a billing period they want. Use up to 256 printable ASCII characters. Spaces are allowed.
Customized Successfully Page
Successfully MessageEnter a note to display in the second page after the user's online payment is made successfully. Use up to 256 printable ASCII characters. Spaces are allowed.
Notification MessageEnter the important information you want to display. Use up to 256 printable ASCII characters. Spaces are allowed.
Notification ColorSpecify the font color of the important information. You can use the color palette chooser, or enter a color value of your own.
Account MessageEnter a note to display above the user account information. Use up to 256 printable ASCII characters. Spaces are allowed.
Day TimeSelect the format in which you want to display the date and how long an account is allowed to stay unused before it expires.
Customized Fail Page
Failed MessageEnter a note to display when the user's online payment failed. Use up to 256 printable ASCII characters. Spaces are allowed.
Customized SMS Page
Information MessageEnter a note to display when you set the Zyxel Device to send account information via SMS text messages. Use up to 256 printable ASCII characters. Spaces are allowed.
Apply Click this button to save your changes to the Zyxel Device.
Reset Click this button to return the screen to its last-saved settings.

CHAPTER 25

Printer Manager

25.1 Printer Manager Overview

You can create dynamic guest accounts and print guest account information by pressing the button on an external statement printer, such as SP350E.

Make sure that the printer is connected to the appropriate power and the Zyxel Device, and that there is printing paper in the printer. Refer to the printer's documentation for details.

25.1.1 What You Can Do in this Chapter

  • Use the Printer Manager > General screen (see Section 24.3 on page 514) to configure the printer list and enable printer management.
  • Use the Printer Manager > Printout Configuration screen (see Section 25.3 on page 538) to customize the account printout.

25.2 The Printer Manager > General Screen

Use this screen to configure a printer list and allow the Zyxel Device to monitor the printer status. Click Configuration > Hotspot > Printer Manager > General to open the following screen.

Figure 362 Configuration > Hotspot > Printer Manager > General
General Printout Configuration General Setting Enable Printer Manager Printer Settings Encryption Secret Key: (4 characters) Printer List Note: If you want to configure printer button, please go to Billing Profile Add Edit Remove Activate Inactivate Discover Printer Refresh Status IPv4 Address Update Time Nickname Firmware Version MAC Desorption Page of 0 Show 50 items No data to display Printer Firmware Information Current Version: SP350E-V1.07 Hotspot Service Status Service Status: Activated Buy Service Type: Trial Expiration Date: 2019-04-20 Apply Reset

The following table describes the labels in this screen.

Table 210 Configuration > Hotspot > Printer Manager > General

LABEL DESCRIPTION
General Setting
Enable Printer ManagerSelect the check box to allow the Zyxel Device to manage and monitor the printer status.
Printer Settings
EncryptionSelect the check box to turn on data encryption. Data transmitted between the Zyxel Device and the printer will be encrypted with a secret key
Secret KeyEnter four alphanumeric characters (A-Z, a-z, 0-9) to specify a key for data encryption.
Printer ListUse this section to add the printer(s) that can be managed by the Zyxel Device.
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
Discover PrinterClick this to discover the printer(s) that is connected to the Zyxel Device and display the printer information in a pop-up window. IPnP is enabled while discovering the printer and disabled when the discovering process has finished.Note: You need a Hotspot license to use this feature.Use Printer Manager > General > Add to manually configure a printer's IP address and add it to the managed printer list when the printer is not detected or connected to the Zyxel Device.
Refresh Click this to update the printer list table.
# This field is a sequential value, and it is not associated with any entry.
StatusThis icon is lit when the entry is active and dimmed when the entry is inactive. Click the Connection icon for the Zyxel Device connect to the printer.
IPv4 Address This field displays the IP address of the printer.
Update TimeThis field displays the date and time the Zyxel Device last synchronized with the printer.This shows n/a when the printer is not in the managed printer list or the printer status is sync fail or sync progressing.
StatusThis field is hidden by default. It displays whether the Zyxel Device can connect to the printer and update the printer information.This shows n/a when the printer is not in the managed printer list.
NicknameThis shows an optional friendly name for the printer that you configured.
Firmware VersionThis field displays the model number and firmware version of the printer.This shows n/a when the printer is not in the managed printer list or the printer status is sync fail.
MAC This shows the hardware MAC address of the printer.
DescriptionThis field displays the descriptive name for the printer that you configured.
Printer Firmware Information
Current VersionThis is the version of the printer firmware currently uploaded to the Zyxel Device. The Zyxel Device automatically installs it in the connected printers to make sure the printers are upgraded to the same version.
Hotspot Service StatusThe hotspot license must be registered in order to be activated.
Service StatusThis field displays whether a service license is enabled at myZyxel (Activated) or not (Not Activated) or expired (Expired). It displays the remaining Grace Period if your license has Expired. It displays Not Licensed if there isn't a license to be activated for this service.If you need a license or a trial license has expired, click Buy to buy a new one. If a Standard license has expired, click Renew to extend the license.Then, click Activate to connect with the myZyxel server to activate the new license.
Service TypeThis shows whether you have a trial or standard license or none (Trial, Standard, None).
Expiration DateThis shows when your hotspot license will expire.
Apply Click this button to save your changes to the Zyxel Device.
Reset Click this button to return the screen to its last-saved settings.

25.2.1 Add Printer Rule

Click the Add icon to open the following screen. Use this screen to add a new printer.

Figure 363 Configuration > Hotspot > Printer Manager > General: Add
Add Printer Manager Enable Printer Manager IPv4 Address: Description: (Optional) OK Cancel

The following table describes the labels in this screen.

Table 211 Configuration > Hotspot > Printer Manager > General: Add

LABEL DESCRIPTION
Enable Printer ManagerSelect this option to turn on this entry in order to allow the Zyxel Device to manage this printer.
IPv4 Address Enteran IPv4 address for the printer.
DescriptionEnter a description of this printer. You can use alphanumeric and ( ) + , / : = ? ! * # @ $ _ % - " characters, and it can be up to 60 characters long.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

25.2.2 Edit Printer Rule

Select an entry in the Printer Manager > General screen and click the Edit icon to open the following screen. Use this screen to modify the printer's settings. You can't click the Edit icon when the printer status is sync fail or sync progressing.

Figure 364 Configuration > Hotspot > Printer Manager > General: Edit
Edit Printer Manager General Settings Enable Printer Manager Nickname: Receipt_Printer (Optional) Description: Test (Optional) IP Address Assignment Get Automatically 192.168.1.34 Use Fixed IP Address IP Address: Subnet Mask: Gateway: OK Cancel

The following table describes the labels in this screen.

Table 212 Configuration > Hotspot > Printer Manager > General: Edit

LABEL DESCRIPTION
Enable Printer ManagerSelect this option to turn on this entry in order to allow the Zyxel Device to manage this printer.
NicknameType an optional friendly name for the printer. A nickname must begin with a letter and cannot exceed 15 characters. Valid characters are [a-zA-Z0-9_-].
DescriptionEnter a description of this printer. You can use alphanumeric and ( ) + , / : = ? ! * #@$ _ % - " characters, and it can be up to 60 characters long.
IP Address Assignment
Get AutomaticallySelect this to make the printer a DHCP client and automatically get the IP address, subnet mask, and gateway address from a DHCP server.
Use Fixed IP AddressSelect this if you want to specify the IP address, subnet mask, and gateway manually.
IP AddressThis field is enabled if you select Use Fixed IP Address.Enter the IP address for the printer.
Subnet MaskThis field is enabled if you select Use Fixed IP Address.Enter the subnet mask of the printer in dot decimal notation. The subnet mask indicates what part of the IP address is the same for all computers on the network.
GatewayThis field is enabled if you select Use Fixed IP Address.Enter the IP address of the gateway. The Zyxel Device sends packets to the gateway when it does not know how to route the packet to its destination. The gateway should be on the same network as the printer.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

25.2.3 Discover Printer

Click the Discover Printer icon in the Printer Manager > General screen to open the following screen. Use this screen to find connected printers or edit a connected printer's settings. Use Printer Manager > General > Add to manually configure a printer's IP address and add it to the managed printer list when the printer is not detected or connected to the Zyxel Device.

Figure 365 Configuration > Hotspot > Printer Manager > General: Discover Printer
Discover Printer Un-Mant Printer List Add to Right Printer List IPv4 Address Update Time Status Nickname Firmware Version MAC 1 192.160.100.110 n/a n/a SDD2_allen n/a ec:43:f6:d8:33:S2 Page 1 of 1 Show 50 Items Displaying 1 - 1 of 1 Mgmt Printer List IPv4 Address Update Time Status Nickname Firmware Version MAC 1 192.168.2.33 2017/03/14 16:16:33 sync success tttttS4321 SP350E-V1.07 ec:43:f6:d8:33:S4 2 172.16.1.100 n/a sync fail n/a 3 192.168.3.34 n/a sync progressing n/a Page 1 of 1 Show 50 Items Displaying 1 - 3 of 3 Cancel

The following table describes the labels in this screen.

Table 213 Configuration > Hotspot > Printer Manager > General > Discover Printer

LABEL DESCRIPTION
Un-Mgmt Printer List / Mgmt Printer ListThe tables displays according to whether the printer is in the unmanaged printer list (Un-Mgmt Printer List) or the managed printer list (Mgmt Printer List).
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.Note: You cannot edit an entry's settings when the printer status is sync fail or sync progressing.
Add to Mgmt Printer ListClick this to add the selected printer to the managed printer list.
# This is the index number of the printer in the list.
RegistrationThis field displays whether the printer is added to the managed printer list (Mgmt Printer) or not (Un-Mgmt Printer).
IPv4 Address This field displays the IP address of the printer.
Update TimeThis field displays the date and time the Zyxel Device last synchronized with the printer.This shows n/a when the printer is not in the managed printer list or the printer status is sync fail or sync progressing.
StatusThis field displays whether the Zyxel Device can connect to the printer and update the printer information.This shows n/a when the printer is not in the managed printer list.
NicknameThis field displays the optional friendly name of the printer that you configured.
Firmware VersionThis field displays the model number and firmware version of the printer.This shows n/a when the printer is not in the managed printer list or the printer status is sync fail.
MAC This field displays the MAC address of the printer.

25.2.4 Edit Printer Manager (Discover Printer)

Select an entry in the Printer Manager > General > Discover Printer screen and click the Edit icon to open the following screen. Use this screen to modify the printer's nickname and IP address.

Figure 366 Configuration > Hotspot > Printer Manager > General > Discover Printer: Edit
Edit Printer Manager General Settings Nickname: Receipt_Printer (Optional) IP Address Assignment Get Automatically 172.17.1.7 Use Fixed IP Address IP Address: Subnet Mask: Gateway:

The following table describes the labels in this screen.

Table 214 Configuration > Hotspot > Printer Manager > General > Discover Printer: Edit

LABEL DESCRIPTION
General Settings
NicknameType an optional friendly name for the printer. A nickname must begin with a letter and cannot exceed 15 characters. Valid characters are [a-zA-Z0-9_-].
IP Address Assignment
Get AutomaticallySelect this to make the printer a DHCP client and automatically get the IP address, subnet mask, and gateway address from a DHCP server.
Use Fixed IP AddressSelect this if you want to specify the IP address, subnet mask, and gateway manually.
IP AddressThis field is enabled if you select Use Fixed IP Address.Enter the IP address for the printer.
Subnet MaskThis field is enabled if you select Use Fixed IP Address.Enter the subnet mask of the printer in dot decimal notation. The subnet mask indicates what part of the IP address is the same for all computers on the network.
GatewayThis field is enabled if you select Use Fixed IP Address.Enter the IP address of the gateway. The Zyxel Device sends packets to the gateway when it does not know how to route the packet to its destination. The gateway should be on the same network as the printer.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

25.3 The Printout Configuration Screen

Use this screen to customize the account printout. Click Configuration > Hotspot > Printer Manager > Printout Configuration to open the following screen.

Figure 367 Configuration > Hotspot > Printer Manager > Printout Configuration
General Printout Configuration General Settings Use Default Printout Configuration Use Customized Printout Configuration Note: To upload a customized printout configuration, browse the location and then click Upload. Notice: 1. The filename you chose should be 'printout.txt' 2. The file format should be 'UTF-8' Preview: Printout Preview File Name: printout.txt Download File Path: Select a File Path Browse... Upload Restore Customized File to Default: Restore Download the customized printout configuration example. Printout Number of Copies: 1

The following table describes the labels in this screen.

Table 215 Configuration > Hotspot > Printer Manager > Printout Configuration

LABEL DESCRIPTION
Use Default Printout ConfigurationSelect this to use the default account printout format built into the device. If you later create a custom account printout format, you can still return to the Zyxel Device's default format as it is saved indefinitely.
Use Customized Printout ConfigurationSelect this to use a custom account printout format instead of the default one built into the Zyxel Device. Once this option is selected, the custom format controls below become active.
PreviewClick the button to display a preview of account printout format you uploaded to the Zyxel Device.
File NameThis shows the file name of account printout format file in the Zyxel Device.Click Download to download the account printout format file from the Zyxel Device to your computer.
File Path /Browse /UploadBrowse for the account printout format file or enter the file path in the available input box, then click the Upload button to put it on the Zyxel Device.
Restore Customized File to DefaultClick Restore to set the Zyxel Device back to use the default built-in account printout format.
DownloadClick this to download an example account printout format file from the Zyxel Device for your reference.
Printout
Number of CopiesSelect how many copies of subscriber statements you want to print (1 is the default).
Apply Click this button to save your changes to the Zyxel Device.
Reset Click this button to return the screen to its last-saved settings.

25.4 Printer Reports Overview

The SP350E allows you to print status reports about the guest accounts and general Zyxel Device system information. Simply press a key combination on the SP350E to print a report instantly without accessing the web configurator.

The following lists the reports that you can print using the SP300E.

• Daily account summary
• Monthly account summary
- Last month account summary
- System status

25.4.1 Key Combinations

The following table lists the key combination to print each report.

Note: You must press the key combination on the SP350E within five seconds to print.

Table 216 Report Printing Key Combinations

REPORT TYPE KEY COMBINATION
Daily Account Summary A B C A A
Monthly Account Summary A B C B A
Last Month Account Summary A B C B B
System Status A B C C A

The following sections describe each report printout in detail.

25.4.2 Daily Account Summary

The daily account report lists the accounts printed during the current day, the current day's total number of accounts and the total charge. It covers the accounts that have been printed during the current day starting from midnight (not the past 24 hours). For example, if you press the daily account key combination on 2013/05/10 at 20:00:00, the daily account report includes the accounts created on 2013/05/10 between 00:00:01 and 19:59:59.

Key combination: A B C A A

The following figure shows an example.

Figure 368 Daily Account Example
Daily Account 2013/05/10 Username Price p2m6pf52 1.00 s4pcms28 2.00 TOTAL ACCOUNTS: 2 TOTAL PRICE: $ 3.00 2013/05/10 20:00:00 ---End---

25.4.3 Monthly Account Summary

The monthly account report lists the accounts printed during the current month, the current month's total number of accounts and the total charge. It covers the accounts that have been printed during the current month starting from midnight of the first day of the current month (not the past one month period). For example, if you press the monthly account key combination on 2013/05/17 at 20:00:00, the monthly account report includes the accounts created from 2013/05/01 at 00:00:01 to 2013/05/17 at 19:59:59.

Key combination: A B C B A

The following figure shows an example.

Figure 369 Monthly Account Example
Monthly Account 2013/05 Username Price p2m6pf52 1.00 s4pcms28 2.00 7ufm7z22 2.00 qm5fxn95 6.00 TOTAL ACCOUNTS: 4 TOTAL PRICE: $ 11.00 2013/05/17 20:00:11 ---End---

25.4.4 Account Report Notes

The daily, monthly or last month account report holds up to 2000 entries. If there are more than 2000 accounts created in the same month or same day, the account report's calculations only include the latest 2000.

For example, if 2030 accounts (each priced at \1) have been created from 2013/05/01 00:00:00 to 2013/05/31 19:59:59, the monthly account report includes the latest 2000 accounts, so the total would be \2,000 instead of \$2,030.

Use the Monitor > System Status > Dynamic Guest screen to see the accounts generated on another day or month (up to 2000 entries total).

25.4.5 System Status

This report shows the current system information such as the host name and WAN IP address.

Key combination: A B C C A

The following figure shows an example.

Figure 370 System Status Example

System Status
ItemDescription
SYST02:02:35
WASTLink up
WLSTActivate
FWVR2.50 (AACG.0)
BTVR1.22
WAMA00-90-0E-00-4A-29
LAMA00-90-0E-00-4A-30
WAIP10.21.2.267
LAIP172.16.0.1
WLIP10.59.1.1
DHSP10.59.1.33
DHEP10.59.1.254
CPUS5%
MEMS40%
DKST5%
2012/04/12 17:10:22 ---End---

The following table describes the labels in this report.

Table 217 System Status

LABEL DESCRIPTION
SYST This field displays the time since the system was last restarted.
WAST This field displays the WAN connection status.
WLST This field displays the status of the Zyxel Device's wireless LAN.
FWVR This field displays the version of the firmware on the Zyxel Device.
BTVR This field displays the version of the bootrom.
WAMA This field displays the MAC address of the Zyxel Device on the WAN.
LAMA This field displays the MAC address of the Zyxel Device on the LAN.

Table 217 System Status (continued)

LABEL DESCRIPTION
WAIPThis field displays the IP address of the WAN port on the Zyxel Device.
LAIP This field displays the IP address of the LAN port on the Zyxel Device.
WLIPThis field displays the IP address of the wireless LAN interface on the Zyxel Device.
DHSPThis field displays the first of the continuous addresses in the IP address pool.
DHEPThis field displays the end of the continuous addresses in the IP address pool.
CPUS This field displays the Zyxel Device's recent CPU usage.
MEMS This field displays the Zyxel Device's recent memory usage.
DKSTThis field displays what percentage of the Zyxel Device's on-board flash memory is currently being used.

CHAPTER 26 Free Time

26.1 Free Time Overview

With Free Time, the Zyxel Device can create dynamic guest accounts that allow users to browse the Internet free of charge for a specified period of time.

26.1.1 What You Can Do in this Chapter

Use the Free Time screen (see Section 26.2 on page 543) to turn on this feature to allow users to get a free account for Internet surfing during the specified time period.

26.2 The Free Time Screen

Use this screen to enable and configure the free time settings. Click Configuration > Hotspot > Free Time to open the following screen.

Figure 371 Configuration > Hotspot > Free Time
Free Time General Settings Enable Free Time Free Time Period: 30 minute Reset Time: Daily Time: 00:00 Maximum Registration Number Before Reset Time: 1 (1-5) Delivery Method: On-Screen Auto Login Note: If you want to configure ssid profile settings of the account, keep user logged in, please go to Billing Hotspot Service Status Service Status: Not Activated Buy Activate Service Type: None Register Now Apply Reset

The following table describes the labels in this screen.

Table 218 Configuration > Hotspot > Free Time

LABEL DESCRIPTION
Enable Free Time Select the check box to turn on the free time feature. Note: After you set up web authentication policies and enable the free time feature on the Zyxel Device, a link displays in the login screen when users try to access the Internet. The link redirects users to a screen where they can get a free account.
Free Time PeriodSelect the duration of time period for which the free time account is allowed to access the Internet.
Reset TimeSelectDailyto have the Zyxel Device allow free account access every day at the specified time.SelectWeeklyto have the Zyxel Device allow free account access once a week on the day you select.SelectMonthlyto have the Zyxel Device allow free account access once a month on a set date.When your free period ends, you will see a message telling you when you can use free time again. This depends on theReset Timeperiod chosen.
TimeIf you selectDaily, select the time in 24-hour format at which the new free time account is allowed to access the Internet.
DayIf you selectWeekly, select the day on which the new free time account is allowed to access the Internet.If you selectMonthly, enter the date on which the new free time account is allowed to access the Internet. If the date you selected is not available in a month, such as 30th or 31th, the Zyxel Device allows the free account access on the last day of the month.
Maximum Registration Number Before Reset TimeEnter the maximum number of users that are allowed to log in for Internet access with a free guest account before the time specified in theReset Timefield. This also sets how many free guest accounts a user can get.For example, if you set theMaximum Registration Number Before Reset Timeto 1, theReset Time toDailyand theReset Timeto 13:00, even the first free guest account has expired at 11:30, the user cannot get a second account and/or access the Internet until 13:00.
Delivery MethodSpecify how the Zyxel Device provides dynamic guest account information.SelectOn-Screento display the user account information in the web screen.SelectSMSto use Short Message Service (SMS) to send account information in a text message to the user's mobile device.SelectOn-Screen and SMSto provide the account information both in the web screen and via SMS text messages.Note: You should have enabled SMS in theConfiguration > System > Notification >SMSscreen to send text messages to the user's mobile device.
Auto LoginSelect this to allow users to log into their free account directly without having to enter their user name and password.Clearing this requires users to enter their user name and password, and click login to access their free account.
Hotspot Service Status
Service StatusThis field displays whether a service license is enabled at myZyxel (Activated) or not (Not Activated) or expired (Expired). It displays the remaining Grace Period if your license has Expired. It displays Not Licensed if there isn't a license to be activated for this service.If you need a license or a trial license has expired, click Buy to buy a new one. If a Standard license has expired, click Renew to extend the license.Then, click Activate to connect with the myZyxel server to activate the new license.
Service TypeThis shows whether you have a trial or standard license or none (Trial, Standard, None).
Expiration DateThis shows when your hotspot license will expire.
Apply Click this button to save your changes to the Zyxel Device.
Reset Click this button to return the screen to its last-saved settings.

The following figure shows an example login screen with a link to create a free guest account.

Enter User Name/Password and click to login. User Name: Password: ( max. 63 alphanumeric, printable characters and no spaces ) Without an account? Click here to get a free account. Login Reset Note: 1. Turn on Javascript and Cookie setting in your web browser. 2. Turn off Popup Window Blocking in your web browser. 3. Turn on Java Runtime Environment (JRE) in your web browser. 4. Allow Gears if you are using Google Chrome.

If you enable both online payment service and free time feature on the Zyxel Device, the link description in the login screen will be mainly for online payment service. You can still click the link to get a free account.

Enter User Name/Password and click to login. User Name: Password: ( max. 63 alphanumeric, printable characters and no spaces ) Without an account? Click here to get an account by online payment. Login Reset Note: 1. Turn on Javascript and Cookie setting in your web browser. 2. Turn off Popup Window Blocking in your web browser. 3. Turn on Java Runtime Environment (JRE) in your web browser. 4. Allow Gears if you are using Google Chrome.

If SMS is enabled on the Zyxel Device, you have to enter your mobile phone number before clicking OK to get a free guest account.

Welcome Please choose the service plan from the following profile table. Service Name Service Time Charge Unit 1 Free Time 30 minutes Free 1 Country Code: 896 Mobile Number: Example: [886][0910123456](for Taiwan) OK

The guest account information then displays on the screen and/or is sent to the configured mobile phone number.

Welcome

You may now use the internet.

IMPORTANT! MAKE a note for your case-sensitive username and password for logging later. This will be your only opportunity to do so.

This is your account information, please keep this for your internet service.

Your username is uz39

Your password is 4vmbdm

Your time period is 30 minutes

OK

CHAPTER 27 IPnP

27.1 IPnP Overview

IP Plug and Play (IPnP) allows a computer to access the Internet without changing the network settings (such as IP address and subnet mask) of the computer, even when the IP addresses of the computer and the Zyxel Device are not in the same subnet.

When you disable the IPnP feature, only computers with dynamic IP addresses or static IP addresses in the same subnet as the Zyxel Device's LAN IP address can connect to the Zyxel Device or access the Internet through the Zyxel Device.

The IPnP feature does not apply to a computer using either a dynamic IP address or a static IP address that is in the same subnet as the Zyxel Device's IP address.

Note: You must enable NAT to use the IPnP feature.

The following figure depicts a scenario where a computer is set to use a static private IP address in the corporate environment. In a residential house where a Zyxel Device is installed, you can still use the computer to access the Internet without changing the network settings, even when the IP addresses of the computer and the Zyxel Device are not in the same subnet.

Figure 372 IPnP Application
ZYXEL USGFLEX700-GB0101F - IPnP Overview - 1

flowchart
graph TD
    A["Computer 192.168.1.23"] --> B["Network"]
    B --> C["Internet"]
    D["Computer 192.168.1.23"] --> E["Data Packet"]
    E --> F["Internet"]

27.1.1 What You Can Do in this Chapter

Use the IP screen (Section 27.1.2 on page 549) to enable IPnP on the Zyxel Device and the internal interface(s).

27.1.2 IPnP Screen

This screen allows you to enable IPnP on the Zyxel Device and specific internal interface(s). To access this screen click Configuration > Hotspot > IPnP.

Figure 373 Configuration > Hotspot > IPnP
IPnP General Settings Enable IPnP Member List Available dmz lan1 lan2 reserved Member Hotspot Service Status Service Status: Not Activated Buy Activate Service Type: None Register Now Apply Reset

The following table describes the labels in this screen.

Table 219 Configuration > Hotspot > IPnP

LABEL DESCRIPTION
Enable IPnPSelect this option to turn on the IPnP feature on the Zyxel Device.Note: You can enable this feature only when the security policy is enabled.
Member ListThe Available list displays the name(s) of the internal interface(s) on which you can enable IPnP.To enable IPnP on an interface, you can double-click a single entry to move it or use the [Shift] or [Ctrl] key to select multiple entries and click the right arrow button to add to the Member list.To remove an interface, select the name(s) in the Member list and click the left arrow button.
Hotspot Service Status
Service StatusThis field displays whether a service license is enabled at myZyxel (Activated) or not (Not Activated) or expired (Expired). It displays the remaining Grace Period if your license has Expired. It displays Not Licensed if there isn't a license to be activated for this service.If you need a license or a trial license has expired, click Buy to buy a new one. If a Standard license has expired, click Renew to extend the license.Then, click Activate to connect with the myZyxel server to activate the new license.
LABEL DESCRIPTION
Service TypeThis shows whether you have a trial or standard license or none (Trial, Standard, None).
Expiration DateThis shows when your hotspot license will expire.
Register NowClick the link to go to myZyxel where you can register your Zyxel Device and activate the service.This link is available only when the service is not activated yet.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

CHAPTER 28

Walled Garden

28.1 Walled Garden Overview

A user must log in before the Zyxel Device allows the user's access to the Internet. However, with a walled garden, you can define one or more web site addresses that all users can access without logging in. These can be used for advertisements for example.

28.2 Walled Garden > General Screen

Use this screen to turn on the walled garden feature.

Note: You must enable web authentication before you can access the Walled Garden screens.

Note: You can configure up to 50 walled garden web site links.

Click Configuration > Hotspot > Walled Garden to display the screen.

Figure 374 Configuration > Hotspot > Walled Garden: General
Walled Garden General URL Base Domain/IP Base General Settings Enable Walled Garden Hotspot Service Status Service Status: Not Activated Buy Activate Service Type: None Register Now Apply Reset

The following table describes the labels in this screen.

Table 220 Configuration > Hotspot > Walled Garden: General

LABEL DESCRIPTION
Enable Walled GardenSelect this to turn on the walled garden feature.Note: This feature works only with the web portal authentication type.
Hotspot Service Status
Service StatusThis field displays whether a service license is enabled at myZyxel (Activated) or not (Not Activated) or expired (Expired). It displays the remaining Grace Period if your license has Expired. It displays Not Licensed if there isn't a license to be activated for this service.If you need a license or a trial license has expired, click Buy to buy a new one. If a Standard license has expired, click Renew to extend the license.Then, click Activate to connect with the myZyxel server to activate the new license.
Service TypeThis shows whether you have a trial or standard license or none (Trial, Standard, None).
Expiration DateThis shows when your hotspot license will expire.
Register NowClick the link to go to myZyxel where you can register your Zyxel Device and activate the service.This link is available only when the service is not activated yet.
ApplyClick this button to save your changes to the Zyxel Device.
Reset Click this button to return the screen to its last-saved settings.

28.3 Walled Garden > URL Base Screen

Use this screen to configure the walled garden web addresses (URLs that use the HTTP or HTTPS protocol) for web sites that all users are allowed to access without logging in. The web site link(s) displays in the user login screen by default.

Click Configuration > Hotspot > Walled Garden and then select the URL Base tab to display the screen.

Figure 375 Configuration > Hotspot > Walled Garden: URL Base
Walled Garden General URL Base Domain/IP Base Walled Garden URL List Add Edit Remove Activate Inactivate Move Status Display Name URL Page 0 of 0 Show 50 items No data to display Apply Reset

The following table describes the labels in this screen.

Table 221 Configuration > Hotspot > Walled Garden: URL Based

LABEL DESCRIPTION
Walled Garden URL ListUse this table to manage the list of walled garden web site links.
AddClick this to create a new entry. Select an entry and click Add to create a new entry after the selected entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
MoveTo move an entry to a different number in the list, click the Move icon. In the field that appears, specify the number to which you want to move the interface.
# This field is a sequential value, and it is not associated with any entry.
StatusThis icon is lit when the entry is active and dimmed when the entry is inactive.
DisplayThis icon is lit when the web site link is set to display in the user login screen.
NameThis field displays the descriptive name of the web site.
URL This field displays the URL of the web site.
ApplyClick this button to save your changes to the Zyxel Device.
Reset Click this button to return the screen to its last-saved settings.

28.3.1 Adding/Editing a Walled Garden URL

Go to the Configuration > Web Authentication > Walled Garden > URL Base screen. Click Add or select an entry and click the Edit to open the Add/Edit Walled Garden URL screen. Use this screen to configure a walled garden web site URL entry.

Figure 376 Configuration > Hotspot > Walled Garden: URL Base: Add/Edit
Add Walled Garden URL Settings Enable Hide in login page Name: URL: Preview OK Cancel

The following table describes the labels in this screen.

Table 222 Configuration > Hotspot > Walled Garden: URL Base: Add/Edit

LABEL DESCRIPTION
Enable Select this to activate the entry.
Hide in login pageSelect this to not display the web site link in the user login screen.This is helpful if a user's access to a specific web site is required to stay connected but he or she doesn't need to visit that web site.
NameEnter a descriptive name for the walled garden link to be displayed in the login screen.You can use up to 31 alphanumeric characters (A-Z, a-z, 0-9) and underscores (_). Spaces are also allowed. The first character must be a letter.
URL Enter the URL of the web site. Use "http://" or "https://" followed by up to 262 characters (0-9a-zA-Z;/?:@&=+$\._1~*')%). For example, http://www.example.com or http://172.16.1.35.
PreviewClick this button to open the specified web site in a new frame.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

28.4 Walled Garden > Domain/IP Base Screen

Use this screen to configure walled garden web site links, which use a (wildcard) domain name or an IP address. These links will not display in the login page.

Click Configuration > Hotspot > Walled Garden and then select the Domain/IP Base tab to display the screen.

Figure 377 Configuration > Hotspot > Walled Garden: Domain/IP Base
Walled Garden General URL Base Domain/IP Base Walled Garden Domain/IP List Add Edit Remove Activate Inactivate Status Name Domain Name/IP Address Page 0 of 0 Show 50 items No data to display Apply Reset

The following table describes the labels in this screen.

Table 223 Configuration > Hotspot > Walled Garden: Domain/IP Based

LABEL DESCRIPTION
Walled Garden Domain/IP ListUse this table to manage the list of walled garden web site links.
AddClick this to create a new entry. Select an entry and click Add to create a new entry after the selected entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
# This field is a sequential value, and it is not associated with any entry.
StatusThis icon is lit when the entry is active and dimmed when the entry is inactive.
NameThis field displays the descriptive name of the web site.
Domain Name/IP AddressThis field displays the domain name or IP address and subnet mask of the web site.
ApplyClick this button to save your changes to the Zyxel Device.
Reset Click this button to return the screen to its last-saved settings.

28.4.1 Adding/Editing a Walled Garden Domain or IP

Go to the Configuration > Hotspot > Walled Garden > Domain/IP Base screen. Click Add or select an entry and click the Edit to open the Add/Edit Walled Garden Domain/IP screen. Use this screen to configure the domain name or IP address entry for a walled garden web site.

Figure 378 Configuration > Hotspot > Walled Garden: Domain/IP Base: Add/Edit
Add Walled Garden Domain/IP Settings Enable Name: Type: Domain Domain Name: OK Cancel

The following table describes the labels in this screen.

Table 224 Configuration > Hotspot > Walled Garden: Domain/IP Base: Add/Edit

LABEL DESCRIPTION
Enable Select this to activate the entry.
NameEnter a descriptive name for the walled garden link.You can use up to 31 alphanumeric characters (A-Z, a-z, 0-9) and underscores (_). Spaces are also allowed. The first character must be a letter.
TypeSelect whether you want to create the link by entering a domain name or an IP address.
Domain Name /IP AddressIf you select Domain, type a Fully-Qualified Domain Name (FQDN) of a web site. An FQDN starts with a host name and continues all the way up to the top-level domain name. For example, www.zyxel.com.tw is a fully qualified domain name, where “www” is the host, “zyxel” is the third-level domain, “com” is the second-level domain, and “tw” is the top level domain.Underscores are not allowed. Use “*.” as a prefix in the FQDN for a wildcard domain name (for example, *.example.com).If you select IP, enter the IP address and subnet mask of the web site.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

28.4.2 Walled Garden Login Example

The following figure shows the user login screen with two walled garden links. The links are named WalledGardenLink1 through 2 for demonstration purposes.

Figure 379 Walled Garden Login Example
WalledGardenLink2 WalledGardenLink1 Enter User Name/Password and click to login. User Name: Password: ( max. 63 alphanumeric, printable characters and no spaces ) Login Reset Note: 1. Turn on Javascript and Cookie setting in your web browser. 2. Turn off Popup Window Blocking in your web browser. 3. Turn on Java Runtime Environment (JRE) in your web browser. 4. Allow Gears if you are using Google Chrome.

CHAPTER 29

29.1 Advertisement Overview

Use this screen to set the Zyxel Device to display an advertisement web page as the first web page whenever the user connects to the Internet.

Click Configuration > Hotspot > Advertisement to display the screen.

Figure 380 Configuration > Hotspot > Advertisement
Advertisement General Settings Enable Advertisement Advertisement Summary Add Edit Remove Name URL Page of 0 Show 50 Items Hotspot Service Status Service Status: Not Activated Buy Activate Service Type: None Register Now Apply Reset

The following table gives an overview of the objects you can configure.

Table 225 Configuration > Hotspot > Advertisement

LABEL DESCRIPTION
Enable AdvertisementSelect this to turn on the advertisement feature.Note: This feature works only when you enable web authentication.
Advertisement SummaryUse this table to manage the list of advertisement web pages.
AddClick this to create a new entry. Select an entry and click Add to create a new entry after the selected entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
# This field is a sequential value, and it is not associated with any entry.
Name This field displays the descriptive name of web site.
URL This field displays the address of web site.
Hotspot Service Status
Service StatusThis field displays whether a service license is enabled at myZyxel (Activated) or not (Not Activated) or expired (Expired). It displays the remaining Grace Period if your license has Expired. It displays Not Licensed if there isn't a license to be activated for this service.If you need a license or a trial license has expired, click Buy to buy a new one. If a Standard license has expired, click Renew to extend the license.Then, click Activate to connect with the myZyxel server to activate the new license.
Service TypeThis shows whether you have a trial or standard license or none (Trial, Standard, None).
Expiration DateThis shows when your hotspot license will expire.
Register NowClick the link to go to myZyxel where you can register your Zyxel Device and activate the service.This link is available only when the service is not activated yet.
ApplyClick this button to save your changes to the Zyxel Device.
Reset Click this button to return the screen to its last-saved settings.

29.1.1 Adding/Editing an Advertisement URL

Click Configuration > Hotspot > Advertisement and then the Add (or Edit) icon in the Advertisement Summary section to open the Add/Edit Advertisement URL screen. Use this screen to configure an advertisement address entry.

Note: You can create up to 20 advertisement URL entries. The Zyxel Device randomly picks one and open the specified web site in a new frame when an authenticated user is attempts to access the Internet.

Figure 381 Configuration > Hotspot > Advertisement > Add/Edit
Add Advertisement URL Settings Name: URL: http://www.example.co Preview Cancel

The following table gives an overview of the objects you can configure.

Table 226 Configuration > Hotspot > Advertisement > Add/Edit

LABEL DESCRIPTION
NameEnter a descriptive name for the advertisement web site.You can use up to 31 alphanumeric characters (A-Z, a-z, 0-9) and underscores (_). Spaces are not allowed. The first character must be a letter.
URL Enter the URL or IP address of the web site.Use "http://" followed by up to 262 characters (0-9a-zA-Z;/?:@&+$\._!~*')%). For example, http://www.example.com or http://172.16.1.35.
PreviewClick this button to open the specified web site in a new frame.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

CHAPTER 30

Security Policy

30.1 Overview

A security policy is a template of security settings that can be applied to specific traffic at specific times. The policy can be applied:

• to a specific direction of travel of packets (from / to)
• to a specific source and destination address objects
• to a specific type of traffic (services)
• to a specific user or group of users
• at a specific schedule

The policy can be configured:

• to allow or deny traffic that matches the criteria above
- send a log or alert for traffic that matches the criteria above
• to apply the actions configured in the profiles (application patrol, content filter, IDP, anti-malware, email security) to traffic that matches the criteria above

Note: Security policies can be applied to both IPv4 and IPv6 traffic.

The security policies can also limit the number of user sessions.

The following example shows the Zyxel Device's default security policies behavior for a specific direction of travel of packets. WAN to LAN traffic and how stateful inspection works. A LAN user can initiate a Telnet session from within the LAN zone and the Zyxel Device allows the response. However, the Zyxel Device blocks incoming Telnet traffic initiated from the WAN zone and destined for the LAN zone.

Figure 382 Default Directional Security Policy Example
ZYXEL USGFLEX700-GB0101F - Overview - 1

flowchart
graph LR
    A["LAN"] --> B["Internet"]
    B --> C["WAN"]
    C --> D["Data Flow Arrow"]
    D --> E["Network Port"]
    style A fill:#cce5ff,stroke:#333
    style B fill:#cce5ff,stroke:#333
    style C fill:#cce5ff,stroke:#333
    style D fill:#cce5ff,stroke:#333
    style E fill:#cce5ff,stroke:#333

30.2 One Security

OneSecurity is a website with guidance on configuration walkthroughs, troubleshooting, and other information. This is an example of a port forwarding configuration walkthrough.

Figure 383 Example of a Port Forwarding Configuration Walkthrough.
Welcome to the Port Forwarding Wizard 1 Welcome to the USG/ZyWALL Port Forwarding Walkthrough Generator. In the next step you will be given an option to choose the type of forwarding you would like to do and input some basic information about your network. Once finished a custom walkthrough will be generated for you. Select Wizard Type Port Forwarding With port forwarding, devices on the inside of your network are reached by a specified port on your Public IP. Port Forwarding is often used for applications such as Remote Desktop, Web Servers, software applications, and gaming consoles. Step 1 What is the port # that you need to forward? What is the IP address that you need to forward to?: Step 2 In the USG, we will create objects for the port and the address that the port will be forwarded to. Down below, please enter in the name for these objects. Do not use spaces. What do you want to call the Port Forward Object? What do you want to call the Address Object? Finish Wizard Please ensure the following information is correct. If it is not, please go back and correct the item. Port: 8060 Port Name: web Forwarding Address: 1.1.1.1 Forwarding Address Name: addr → Prev Next→ → Prev Next→

This is an example of L2TP over IPSec VPN Troubleshooting troubleshooting.

Figure 384 Example of L2TP over IPSec Troubleshooting - 1

L2TP over IPSec VPN Troubleshooting

Is the VPN established?

Yes 1
No - I receive an error 2
My connection is intermittent 3

No Connection

2

Common Configuration Issues

  • Verify that the USG has default settings for the Default_L2TP_VPN rules in the IPSec VPN menu
  • VPN Gateway ensure your settings match below. You will also need to click the Show Advanced Settings option at the top;

Phase 1 Settings
SA Life Time: 36400 (380 - 3000000 Seconds) Negotiation Mode: Plan Proposal Add Encryption - Authentication 1 XDES SHA1 2 XDES MD5 3 DES SHA1 Key Group: DHQ

Key Group
NAT Traversal
Dead Peer Detection (DPO)

Please note that you will not be able to establish the L2TP connection if your WAN connection is assigned a private IP. You must have a public IP address assigned directly to the WAN port.

- VPN Connection, ensure your settings match below. You will also need to click the Show Advanced Settings option at the top;

Phase 2 Setting
SA Life Time: 80400 (200 - 3000000 Seconds) Active Protocol: ESP Encapsulation: Transport Proposal Add Encryption Authentication 1 DES SHA1 2 DES MOS 3 DES SHA1 Perfect Forward Secrecy (FIS): none

You will need to create an address object for your WAN (outside/public) IP, and select this object for the Local Policy;

Create Address Name: INAVIP Address Type: HIST IP Address: 216.237.21.243 OK Cancel

• Alternatively you can SSH into the USB and issue a series of commands to default the LOTP Settings;

Create Address Name: map@p Address Type: HOST IP Address: 216.237.21.243 OK Cancel

Once you have the session established you#4TMI need to enter #configure terminal#4TM and press enter. Then type the command #12p-over-ipsec recover default-ipsec-policy#to default the rules.

- Verify the firewall is setup properly to allow traffic from IPSec zone to all(any).

Logs To Look For

• LSTP Connected
• LOTP Disconnected
• Incorrect username/password
• No proposal chose
• Phase 1 proposal mismatch

Go Back To Start

Figure 385 Example of L2TP over IPSec Troubleshooting - 2
Intermittent Connection • ISP Issues: o In some cases your ISP may be blocking specific ports necessary to establish and maintain the VPN connection. ■ An easy way to verify this would be to initiate the connection to the USG. If nothing displays in the logs it is likely that certain ports are being blocked even before they reach the USG. ■ Services Necessary: ■ IKE ■ GRE ■ AH ■ NAT • Slow Speeds: o There are several factors that influence the overall bandwidth of the VPN tunnel. ■ Additional delays can be caused by the encryption and decryption process, especially with internet traffic. ■ The network speeds of the L2TP client. • Remote Network Issues: o In certain cases we may need to check the settings of the remote router or gateway. ■ if available, we want to ensure that any IP3ec or L2TP pass-through is enabled. ■ We may need to forward ports to the L2TP client to ensure a stable connection. ■ Services Necessary ■ L2TP ■ GRE • Logs to Look For: o L2TP Connect/Disconnect o No tunnel found errors Go Back To Start

In the Zyxel Device, you will see icons that link to OneSecurity walkthroughs, troubleshooting and so on in certain screens.

For example, at the time of writing, these are the OneSecurity icons you can see.

Table 227 OneSecurity Icons

ONESECURITY ICON SCREEN
ZYXEL USGFLEX700-GB0101F - Logs To Look For - 2Configuration WalkthroughClick this icon to go to a series of screens that guide you how to configure the feature. Note that the walkthroughs do not perform the actual configuring, but just show you how to do it.Device HA > GeneralLicensing > RegistrationNetwork > NATNetwork > Routing > Policy RouteSecurity Service > App PatrolSecurity Service > Content FilterSecurity Service > IDPSecurity > Anti-MalwareSecurity Service > Email SecurityV P N > I P S e c V P NV P N> S S L V P NV P N> L 2 T P V P N
ZYXEL USGFLEX700-GB0101F - Logs To Look For - 3TroubleshootingClick this icon to go to a series of screens that guide you how to fix problems with the feature.Device HA > GeneralNetwork > NATNetwork > Routing > Policy RouteSecurity Service > App PatrolSecurity Service > Content FilterSecurity Service > IDPSecurity > Anti-MalwareSecurity Service > Email SecurityV P N > I P S e c V P NV P N> S S L V P NV P N> L 2 T P V P N
ZYXEL USGFLEX700-GB0101F - Logs To Look For - 4Application PatrolClick this icon for more information on Application Patrol, which identifies traffic that passes through the Zyxel Device, so you can decide what to do with specific types of traffic. Traffic not recognized by application patrol is ignored.• Security Service > Application Patrol
ZYXEL USGFLEX700-GB0101F - Logs To Look For - 5Content FilterClick this icon for more information on Content Filter, which controls access to specific web sites or web content.• Security Service > Content Filter
ZYXEL USGFLEX700-GB0101F - Logs To Look For - 6VPNClick this icon for more information on IPSec and SSL VPN. Internet Protocol Security (IPSec) VPN connects IPSec routers or remote users using IPSec client software. SSL VPN allows users to use a web browser for secure remote user login without need of a VPN router or VPN client software.• V P N > I P S e c V P N• V P N > S S L V P N
ZYXEL USGFLEX700-GB0101F - Logs To Look For - 7Download VPN ClientClick this icon to download VPN client software.• V P N > I P S e c V P N• V P N > S S L V P N
ZYXEL USGFLEX700-GB0101F - Logs To Look For - 8Wireless AP ControllerClick this icon for more information on the Wireless AP Controller which sets how the Zyxel Device allows APs to connect to the wireless network.• Wireless > AP Management > Mgmt. AP List

30.3 What You Can Do in this Chapter

  • Use the Security Policy Control screens (Section 30.4 on page 566) to enable or disable policies, asymmetrical routes, and manage and configure policies.
  • Use the Anomaly Detection and Prevention (ADP) screens (Section 30.5 on page 572) to detect traffic with protocol anomalies and take appropriate action.
  • Use the Session Control screens (see Section 30.6 on page 581) to limit the number of concurrent NAT/security policies traffic sessions a client can use.

30.3.1 What You Need to Know

Stateful Inspection

The Zyxel Device uses stateful inspection in its security policies. The Zyxel Device restricts access by screening data packets against defined access rules. It also inspects sessions. For example, traffic from one zone is not allowed unless it is initiated by a computer in another zone first.

Zones

A zone is a group of interfaces. Group the Zyxel Device's interfaces into different zones based on your needs. You can configure security policies for data passing between zones or even between interfaces.

Default Directional Security Policy Behavior

Security Policies can be grouped based on the direction of travel of packets to which they apply. Here is the The Zyxel Device has default Security Policy behavior for traffic going through the Zyxel Device in various directions.

Table 228 Directional Security Policy Behavior

FROM ZONE TO ZONE BEHAVIOR
From any to DeviceDHCP traffic from any interface to the Zyxel Device is allowed.
From LAN1 to any (other than the Zyxel Device)Traffic from the LAN1 to any of the networks connected to the Zyxel Device is allowed.
From LAN2 to any (other than the Zyxel Device)Traffic from the LAN2 to any of the networks connected to the Zyxel Device is allowed.
From LAN1 to Device Traffic fromthe LAN1 to the Zyxel Device itself is allowed.
From LAN2 to Device Traffic fromthe LAN2 to the Zyxel Device itself is allowed.
From WAN to DeviceThe default services listed inTo-Device Policiesare allowed from the WAN to the Zyxel Device itself. All other WAN to Zyxel Device traffic is dropped.
From any to anyTraffic that does not match any Security policy is dropped. This includes traffic from the WAN to any of the networks behind the Zyxel Device.This also includes traffic to or from interfaces that are not assigned to a zone (extra-zone traffic).

To-Device Policies

Policies with Device as the To Zone apply to traffic going to the Zyxel Device itself. By default:

  • The Security Policy allows only LAN, or WAN computers to access or manage the Zyxel Device.
  • The Zyxel Device allows DHCP traffic from any interface to the Zyxel Device.
  • The Zyxel Device drops most packets from the WAN zone to the Zyxel Device itself and generates a log except for AH, ESP, GRE, HTTPS, IKE, NATT.

When you configure a Security Policy rule for packets destined for the Zyxel Device itself, make sure it does not conflict with your service control rule. The Zyxel Device checks the security policy before the service control rules for traffic destined for the Zyxel Device.

A From Any To Device direction policy applies to traffic from an interface which is not in a zone.

Global Security Policies

Security Policies with from any and/or to any as the packet direction are called global Security Policies. The global Security Policies are the only Security Policies that apply to an interface that is not included in a zone. The from any policies apply to traffic coming from the interface and the to any policies apply to traffic going to the interface.

Security Policy Rule Criteria

The Zyxel Device checks the schedule, user name (user's login name on the Zyxel Device), source IP address and object, destination IP address and object, IP protocol type of network traffic (service) and Security Service profile criteria against the Security Policies (in the order you list them). When the traffic matches a policy, the Zyxel Device takes the action specified in the policy.

User Specific Security Policies

You can specify users or user groups in Security Policies. For example, to allow a specific user from any computer to access a zone by logging in to the Zyxel Device, you can set up a policy based on the user name only. If you also apply a schedule to the Security Policy, the user can only access the network at the scheduled time. A user-aware Security Policy is activated whenever the user logs in to the Zyxel Device and will be disabled after the user logs out of the Zyxel Device.

Session Limits

Accessing the Zyxel Device or network resources through the Zyxel Device requires a NAT session and corresponding Security Policy session. Peer to peer applications, such as file sharing applications, may use a large number of NAT sessions. A single client could use all of the available NAT sessions and prevent others from connecting to or through the Zyxel Device. The Zyxel Device lets you limit the number of concurrent NAT/Security Policy sessions a client can use.

30.4 The Security Policy Screen

Asymmetrical Routes

If an alternate gateway on the LAN has an IP address in the same subnet as the Zyxel Device's LAN IP address, return traffic may not go through the Zyxel Device. This is called an asymmetrical or "triangle" route. This causes the Zyxel Device to reset the connection, as the connection has not been acknowledged.

You can have the Zyxel Device permit the use of asymmetrical route topology on the network (not reset the connection). However, allowing asymmetrical routes may let traffic from the WAN go directly to the LAN without passing through the Zyxel Device. A better solution is to use virtual interfaces to put the Zyxel Device and the backup gateway on separate subnets. Virtual interfaces allow you to partition your network into logical sections over the same interface. See the chapter about interfaces for more information.

By putting LAN 1 and the alternate gateway (A in the figure) in different subnets, all returning network traffic must pass through the Zyxel Device to the LAN. The following steps and figure describe such a scenario.

1 A computer on the LAN1 initiates a connection by sending a SYN packet to a receiving server on the WAN.
2 The Zyxel Device reroutes the packet to gateway A, which is in Subnet 2.
3 The reply from the WAN goes to the Zyxel Device.
4 The Zyxel Device then sends it to the computer on the LAN1 in Subnet 1.

Figure 386 Using Virtual Interfaces to Avoid Asymmetrical Routes
ZYXEL USGFLEX700-GB0101F - Asymmetrical Routes - 1

flowchart
graph TD
    A["LAN 1"] -->|1| B["Subnet 1"]
    B --> C["Internet"]
    C -->|ISP 2| D["A"]
    D -->|ISP 1| B
    B -->|2| E["Subnet 2"]
    E -->|3| D
    style A fill:#cce5ff,stroke:#333
    style B fill:#ffcccc,stroke:#333
    style C fill:#ffffff,stroke:#333
    style D fill:#ffffff,stroke:#333
    style E fill:#ffffff,stroke:#333

30.4.1 Configuring the Security Policy Control Screen

Click Configuration > Security Policy > Policy Control to open the Security Policy screen. Use this screen to enable or disable the Security Policy and asymmetrical routes, set a maximum number of sessions per host, and display the configured Security Policies. Specify from which zone packets come and to which zone packets travel to display only the policies specific to the selected direction. Note the following.

  • Besides configuring the Security Policy, you also need to configure NAT rules to allow computers on the WAN to access LAN devices.
  • The Zyxel Device applies NAT (Destination NAT) settings before applying the Security Policies. So for example, if you configure a NAT entry that sends WAN traffic to a LAN IP address, when you configure a corresponding Security Policy to allow the traffic, you need to set the LAN IP address as the destination.
  • The ordering of your policies is very important as policies are applied in sequence.

The following screen shows the Security Policy summary screen.

Figure 387 Configuration > Security Policy > Policy Control
Policy Hide Filter General Settings Enable Policy Control IPv4 Configuration From: any Service: any To: any User: any IPv4 Source: Schedule: IPv4 Destination: Search Reset Allow Asymmetrical Route Add Edit Remove Activate inactivate Move Clone Pr... St... Name From To IPv4 S... IPv4 D... Service User Sched... A... Log Profile 1 LAN1_Outg... LAN1 any (E... any any any any none al... no 2 LAN2_Outg... LAN2 any (E... any any any any none al... no 3 DMZ_to_WAN DMZ WAN any any any any any none al... no 4 IPSec_VPN... IPSec... any (E... any any any any none al... no 5 SSL_VPN_O... SSL ... any (E... any any any any none al... no 6 TUNNEL_Ou... TUNNEL any (E... any any any any none al... no 7 LAN1_to_D... LAN1 ZyWALL any any any any none al... no 8 LAN2_to_D... LAN2 ZyWALL any any any any none al... no 9 DMZ_to_De... DMZ ZyWALL any any Defa... any none al... no 10 WAN_to_D... WAN ZyWALL any any Defa... any none al... no 11 IPSec_VPN... IPSec... ZyWALL any any any any none al... no 12 SSL_VPN_to... SSL ... ZyWALL any any any any none al... no 13 TUNNEL_to... TUNNEL ZyWALL any any any any none al... no D... any any any any any any none d... log Page 1 of 1 Show 50 items Displaying 1 - 14 of 14 IPv6 Configuration From: any Service: any To: any User: any Source: Schedule: Destination: Search Reset Allow Asymmetrical Route Add Edit Remove Activate Inactivate Move Clone Pr... St... Name From To IPv6 S... IPv6 D... Service User Sched... A... Log Profile 1 Device_Def... any ZyWALL any any Defa... any none al... no 2 LAN1_Outg... LAN1 any (E... any any any any none al... no 3 LAN2_Outg... LAN2 any (E... any any any any none al... no 4 DMZ_to_WAN DMZ WAN any any any any none al... no 5 IPSec_VPN... IPSec... any (E... any any any any none al... no 6 SSL_VPN_O... SSL ... any (E... any any any none al... no 7 TUNNEL_Ou... TUNNEL any (E... any any any none al... no 8 LAN1_to_D... LAN1 ZyWALL any any any any none al... no 9 LAN2_to_D... LAN2 ZyWALL any any any any none al... no 10 DMZ_to_De... DMZ ZyWALL any any Defa... any none al... no 11 WAN_to_D... WAN ZyWALL any any Defa... any none al... no 12 IPSec_VPN... IPSec... ZyWALL any any any any none al... no 13 SSL_VPN_to... SSL ... ZyWALL any any any any none al... no 14 TUNNEL_to... TUNNEL ZyWALL any any any any none al... no D... any any any any any none d... log Page 1 of 1 Show 50 Items Displaying 1 - 15 of 15 Apply Reset

The following table describes the labels in this screen.

Table 229 Configuration > Security Policy > Policy Control

LABEL DESCRIPTION
Show Filter/Hide FilterClick Show Filter to display IPv4 and IPv6 (if enabled) security policy search filters.
General SettingsEnable or disable the Security Policy feature on the Zyxel Device.
Enable Policy ControlSelect this to activate Security Policy on the Zyxel Device to perform access control.
IPv4 / IPv6 ConfigurationUse IPv4 / IPv6 search filters to find specific IPv4 and IPv6 (if enabled) security policies based on direction, application, user, source, destination and/or schedule.
From / ToSelect a zone to view all security policies from a particular zone and/or to a particular zone.any means all zones.
IPv4 / IPv6 SourceType an IPv4 or IPv6 IP address to view all security policies based on the IPv4 / IPv6 source address object used.An IPv4 IP address is written as four integer blocks separated by periods. This is an example IPv4 address: 172.16.6.7.An 128-bit IPv6 address is written as eight 16-bit hexadecimal blocks separated by colons (:). This is an example IPv6 address: 2001:0db8:1a2b:0015:0000:0000:1a2f:0000.
IPv4 / IPv6 DestinationType an IPv4 or IPv6 IP address to view all security policies based on the IPv4 / IPv6 destination address object used.An IPv4 IP address is written as four integer blocks separated by periods. This is an example IPv4 address: 172.16.6.7.An 128-bit IPv6 address is written as eight 16-bit hexadecimal blocks separated by colons (:). This is an example IPv6 address: 2001:0db8:1a2b:0015:0000:0000;1a2f:0000.
Service View all security policies based the service object used.
User View all security policies based on user or user group object used.
Schedule View all security policies based on the schedule object used.
IPv4/IPv6 Policy ManagementUse the following items to manage IPv4 and IPv6 policies.
Allow Asymmetrical RouteIf an alternate gateway on the LAN has an IP address in the same subnet as the Zyxel Device's LAN IP address, return traffic may not go through the Zyxel Device. This is called an asymmetrical or "triangle" route. This causes the Zyxel Device to reset the connection, as the connection has not been acknowledged.Select this check box to have the Zyxel Device permit the use of asymmetrical route topology on the network (not reset the connection).Note: Allowing asymmetrical routes may let traffic from the WAN go directly to the LAN without passing through the Zyxel Device. A better solution is to use virtual interfaces to put the Zyxel Device and the backup gateway on separate subnets.
AddClick this to create a new entry. Select an entry and click Add to create a new entry after the selected entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
MoveTo change a policy's position in the numbered list, select the policy and clickMoveto display a field to type a number for where you want to put that policy and press [ENTER] to move the policy to the number that you typed.The ordering of your policies is important as they are applied in order of their numbering.
CloneUseCloneto create a new entry by modifying an existing one.Select an existing entry.ClickClone, type a number where the new entry should go and then press [ENTER].A configuration copy of the selected entry pops up. You must at least change the name as duplicate entry names are not allowed.
The following read-only fields summarize the policies you have created that apply to traffic traveling in the selected packet direction.
PriorityThis is the position of your Security Policy in the global policy list (including all through-Zyxel Device and to-Zyxel Device policies). The ordering of your policies is important as policies are applied in sequence.Defaultdisplays for the default Security Policy behavior that the Zyxel Device performs on traffic that does not match any other Security Policy.
Status This icon is litwhen the entry is active and dimmed when the entry is inactive.
Name This is the name of the Security policy.
From / ToThis is the direction of travel of packets. Select from which zone the packets come and to which zone they go.Security Policies are grouped based on the direction of travel of packets to which they apply. For example, fromLANto LANmeans packets traveling from a computer or subnet on the LAN to either another computer or subnet on the LAN.Fromanydisplays all the Security Policies for traffic going to the selectedTo Zone.Toanydisplays all the Security Policies for traffic coming from the selectedFrom Zone.Fromanyto anydisplays all of the Security Policies.ToZYWALLpolicies are for traffic that is destined for the Zyxel Device and control which computers can manage the Zyxel Device.
IPv4 / IPv6 SourceThis displays the IPv4 / IPv6 source address object, including geographic address and FQDN (group) objects, to which this Security Policy applies.
IPv4 / IPv6 DestinationThis displays the IPv4 / IPv6 destination address object, including geographic address and FQDN (group) objects, to which this Security Policy applies.
ServiceThis displays the service object to which this Security Policy applies.
UserThis is the user name or user group name to which this Security Policy applies.
ScheduleThis field tells you the schedule object that the policy uses. nonemeans the policy is active at all times if enabled.
ActionThis field displays whether the Security Policy silently discards packets without notification (deny), permits the passage of packets (allow) or drops packets with notification (reject)
LogSelect whether to have the Zyxel Device generate a log (log), log and alert (log alert) or not (no) when the policy is matched to the criteria listed above.
ProfileThis field shows you which Security Service profiles (application patrol, content filter, IDP, anti-malware, email security) apply to this Security policy. Click an applied Security Service profile icon to edit the profile directly.
ApplyClickApplyto save your changes back to the Zyxel Device.
ResetClickResetto return the screen to its last-saved settings.

30.4.2 The Security Policy Control Add/Edit Screen

In the Security Policy Control screen, click the Edit or Add icon to display the Security Policy Edit or Add screen.

Figure 388 Configuration > Security Policy > Policy Control > Add
Add corresponding Create new Object Enable Name: Description: From: any To: any (Excluding ZyV) Source: any Destination: any Service: any User: any Schedule: none Action: allow Log matched traffic: no Profile Application Patrol: none Content Filter: none SSL Inspection: none (Optional) Log: by profile Log: by profile Log: by profile OK Cancel

The following table describes the labels in this screen.

Table 230 Configuration > Security Policy > Policy Control > Add

LABEL DESCRIPTION
Create new ObjectUse to configure any new settings objects that you need to use in this screen.
Enable Select thischeck box to activate the Security policy.
Name Type a nameto identify the policy
DescriptionEnter a descriptive name of up to 60 printable ASCII characters for the Policy. Spaces are allowed.
From ToFor through-Zyxel Device policies, select the direction of travel of packets to which the policy applies.anymeans all interfaces.Devicemeans packets destined for the Zyxel Device itself.
SourceSelect an IPv4 / IPv6 address or address group object, including geographic address and FQDN (group) objects, to apply the policy to traffic coming from it. Selectanyto apply the policy to all traffic coming from IPv4 / IPv6 addresses.
DestinationSelect an IPv4 / IPv6 address or address group, including geographic address and FQDN (group) objects, to apply the policy to traffic going to it. Selectanyto apply the policy to all traffic going to IPv4 / IPv6 addresses.
Service Select a service or service group from the drop-down list box.
UserThis field is not available when you are configuring a to-Zyxel Device policy.Select a user name or user group to which to apply the policy. The Security Policy is activated only when the specified user logs into the system and the policy will be disabled when the user logs out.Otherwise, select any and there is no need for user logging.Note: If you specified a source IP address (group) instead of any in the field below, the user's IP address should be within the IP address range.
ScheduleSelect a schedule that defines when the policy applies. Otherwise, select none and the policy is always effective.
ActionUse the drop-down list box to select what the Security Policy is to do with packets that match this policy.Select deny to silently discard the packets without sending a TCP reset packet or an ICMP destination-unreachable message to the sender.Select reject to discard the packets and send a TCP reset packet or an ICMP destination-unreachable message to the sender.Select allow to permit the passage of the packets.
Log matched trafficSelect whether to have the Zyxel Device generate a log (log), log and alert (log alert) or not (no) when the policy is matched to the criteria listed above..
ProfileUse this section to apply anti- x profiles (created in theConfiguration > Security Service screens) to traffic that matches the criteria above. You must have created a profile first; otherwise none displays.Use Log to generate a log (log), log and alert (log alert) or not (no) for all traffic that matches criteria in the profile.
Application PatrolSelect an Application Patrol profile from the list box; none displays if no profiles have been created in theConfiguration > Security Service > App Patrol screen.
Content FilterSelect a Content Filter profile from the list box; none displays if no profiles have been created in theConfiguration > Security Service > Content Filter screen.
SSL InspectionSelect an SSL Inspection profile from the list box; none displays if no profiles have been created in theConfiguration > Security Service > SSL Inspection screen.
OKClick OK to save your customized settings and exit this screen.
CancelClick Cancel to exit this screen without saving.

30.5 Anomaly Detection and Prevention Overview

Anomaly Detection and Prevention (ADP) protects against anomalies based on violations of protocol standards (RFCs – Requests for Comments) and abnormal flows such as port scans. This section introduces ADP, anomaly profiles and applying an ADP profile to a traffic direction.

Traffic Anomalies

Traffic anomaly policies look for abnormal behavior or events such as port scanning, sweeping or network flooding. They operate at OSI layer-2 and layer-3. Traffic anomaly policies may be updated when you upload new firmware.

Protocol Anomalies

Protocol anomalies are packets that do not comply with the relevant RFC (Request For Comments). Protocol anomaly detection includes:

  • TCP Decoder
  • UDP Decoder
  • ICMP Decoder

Protocol anomaly policies may be updated when you upload new firmware.

Note: First, create an ADP profile in the In the Configuration > Security Policy > ADP > Profile screen.

Then, apply the profile to traffic originating from a specific zone in the Configuration > Security Policy > ADP > General screen.

30.5.1 The Anomaly Detection and Prevention General Screen

Click Configuration > Security Policy > ADP > General to display the next screen.

Figure 389 Configuration > Security Policy > ADP > General
General Profile General Settings Enable Anomaly Detection and Prevention Policies Add Edit Remove Activate Inactivate Move Priorit Status From Anomaly Profile 1 1 WAN ADP_PROFILE Page 1 of 1 Show 50 Items Displaying 1 - 1 of 1

The following table describes the labels in this screen.

Table 231 Configuration > Security Policy > ADP > General

LABEL DESCRIPTION
General Settings
Enable Anomaly Detection and PreventionSelect this to enable traffic anomaly and protocol anomaly detection and prevention.
AddSelect an entry and click Add to append a new row beneath the one selected. ADP policies are applied in order (Priority) shown in this screen
Edit Select an entry and click this to be able to modify it.
Remove Select an entry and click this to delete it.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
MoveTo change an entry's position in the numbered list, select it and click Move to display a field to type a number for where you want to put that entry and press [ENTER] to move the entry to the number that you typed.
# This is the entry's index number in the list.

Table 231 Configuration > Security Policy > ADP > General

LABEL DESCRIPTION
PriorityThis is the rank in the list of anomaly profile policies. The list is applied in order of priority.
StatusThe activate (light bulb) icon is lit when the entry is active and dimmed when the entry is inactive.
FromThis is the direction of travel of packets to which an anomaly profile is bound. Traffic direction is defined by the zone the traffic is coming from.Use theFromfield to specify the zone from which the traffic is coming. SelectZyWALLto specify traffic coming from the Zyxel Device itself.FromLANmeans packets traveling from a computer on one LAN subnet to a computer on another subnet via the Zyxel Device's LAN1 zone interfaces. The Zyxel Device does not check packets traveling from a LAN computer to another LAN computer on the same subnet.FromWANmeans packets that come in from the WAN zone and the Zyxel Device routes back out through the WAN zone.Note: Depending on your network topology and traffic load, applying every packet direction to an anomaly profile may affect the Zyxel Device's performance.
Anomaly ProfileAn anomaly profile is a set of anomaly policies with configured activation, log and action settings. This field shows which anomaly profile is bound to which traffic direction. Select an ADP profile to apply to the entry's traffic direction. Configure the ADP profiles in the ADP profile screens.

30.5.2 Creating New ADP Profiles

Create new ADP profiles in the Configuration > Security Policy > ADP > Profile screens.

When creating ADP profiles, you may find that certain policies are triggering too many false positives or false negatives. A false positive is when valid traffic is flagged as an attack. A false negative is when invalid traffic is wrongly allowed to pass through the Zyxel Device. As each network is different, false positives and false negatives are common on initial ADP deployment.

To counter this, you could create a 'monitor profile' that creates logs, but all actions are disabled. Observe the logs over time and try to eliminate the causes of the false alarms. When you're satisfied that they have been reduced to an acceptable level, you could then create an 'in-line profile' whereby you configure appropriate actions to be taken when a packet matches a policy.

ADP profiles consist of traffic anomaly profiles and protocol anomaly profiles. To create a new profile, select a base profile and then click OK to go to the profile details screen. Type a new profile name, enable or disable individual policies and then edit the default log options and actions.

Click Configuration > Security Policy > ADP > Profile to view the following screen.

Figure 390 Configuration > Security Policy > ADP > Profile
General Profile Profile Management Add Edit Remove References Clone Name Description Base Profile Reference 1 ADP_PROFILE all 1 Page 1 of 1 Show 50 Items Displaying 1 - 1 of 1

The following table describes the labels in this screen.

Table 232 Configuration > Security Policy > ADP > Profile

LABEL DESCRIPTION
Profile ManagementCreate ADP profiles here and then apply them in theConfiguration > Security Policy>ADP > Profilescreen.
AddClick Addand first choose anononeor all Base Profile nonebase profile sets all ADP entries to haveLogset tonoandActionset tononeby default.allbase profile sets all ADP entries to haveLogset tologandActionset toblockby default.
Edit Select an entry and click this to be able to modify it.
Remove Select an entry and click this to delete it.
ReferencesSelect an entry and clickReferencesto open a screen that shows which settings usethe entry. ClickRefreshto update information on this screen.
CloneUseCloneto create a new entry by modifying an existing one.Select an existing entry.ClickClone.A configuration copy of the selected entry pops up. You must at least changethe name as duplicate entry names are not allowed.
# This is the entry's index number in the list.
Name This is the name of the profile you created.
DescriptionThis is the description of the profile you created.
Base Profile This is the name of the base profile used to create this profile.
Reference This is the number of object references used to create this profile.

30.5.3 Traffic Anomaly Profiles

Traffic anomaly detection looks for abnormal behavior such as scan or flooding attempts. In the Configuration > Security Policy > ADP > Profile screen, click the Edit or Add icon and choose a base profile. Traffic Anomaly is the first tab in the profile.

Figure 391 Configuration > Security Policy > ADP > Profile > Add-Traffic-Anomaly
Edit Anomaly Profile Traffic Anomaly Protocol Anomaly General Name: ADP_PROFILE Description: Scan Detection Sensitivity: medium Block Period: 5 (1-3600 seconds) Status Name Log Action 1 (portscan) IP Protocol ScanLoad log block 2 (portscan) TCP PortscanLoad log block 3 (portscan) UDP PortscanLoad log block 4 (sweep) ICMP SweepLoad log block 5 (sweep) IP Protocol SweepLoad log block 6 (sweep) TCP Port SweepLoad log block 7 (sweep) UDP Port SweepLoad log block Page 1 of 1 Show 50 items Displaying 1 - 7 of 7 Flood Detection Block Period: 5 (1-3600 seconds) Edit Activate Inactivate\Log Action Status Name Log Action Treshold(p... 1 flood) ICMP FloodLoad log block 1000 2 flood) IP FloodLoad log block 1000 3 flood) TCP FloodLoad log block 1000 4 flood) UDP FloodLoad log block 1000 Page 1 of 1 Show 50 Items Displaying 1 - 4 of 4 OK Cancel Save

The following table describes the labels in this screen.

Table 233 Configuration > Security Policy > ADP > Profile > Add-Traffic-Anomaly

LABELS DESCRIPTION
Name A name is automatically generated that you can edit. The name must be the same in the Traffic Anomaly and Protocol Anomaly screens for the same ADP profile. You may use 1-31 alphanumeric characters, underscores( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive. These are valid, unique profile names:My ProfilemYProfileMymy12_3-4These are invalid profile names:I m Y ProfileMy ProfileMyProfile?Whatalongprofilename123456789012
DescriptionIn addition to the name, type additional information to help you identify this ADP profile.
LABELSDESCRIPTION
Scan/Flood DetectionScan detection, such as port scanning, tries to find attacks where an attacker scans device(s) to determine what types of network protocols or services a device supports.Flood detection tries to find attacks that saturate a network with useless data, use up all available bandwidth, and so aim to make communications on the network impossible.
Sensitivity(Scan detection only.) Select a sensitivity level so as to reduce false positives in your network. If you choose low sensitivity, then scan thresholds and sample times are set low, so you will have fewer logs and false positives; however some traffic anomaly attacks may not be detected.If you choose high sensitivity, then scan thresholds and sample times are set high, so most traffic anomaly attacks will be detected; however you will have more logs and false positives.
Block PeriodSpecify for how many seconds the Zyxel Device blocks all packets from being sent to the victim (destination) of a detected anomaly attack. Flood Detection applies blocking to the destination IP address and Scan Detection applies blocking to the source IP address.
Edit (Flood Detection only)Select an entry and click this to be able to modify it.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
LogTo edit an item's log option, select it and use the Log icon. Select whether to have the Zyxel Device generate a log (log), log and alert (log alert) or neither (no) when traffic matches this anomaly policy.
ActionTo edit what action the Zyxel Device takes when a packet matches a policy, select the policy and use the Action icon none: The Zyxel Device takes no action when a packet matches the policy.block: The Zyxel Device silently drops packets that matches the policy. Neither sender nor receiver are notified.
# This is the entry's index number in the list.
StatusThe activate (light bulb) icon is lit when the entry is active and dimmed when the entry is inactive.
NameThis is the name of the anomaly policy. Click the Name column heading to sort in ascending or descending order according to the protocol anomaly policy name.
LogThese are the log options. To edit this, select an item and use the Log icon.
ActionThis is the action the Zyxel Device should take when a packet matches a policy. To edit this, select an item and use the Action icon.
Threshold (pkt/sec)(Flood detection only.) Select a suitable threshold level (the number of packets per second that match the flood detection criteria) for your network. If you choose a low threshold, most traffic anomaly attacks will be detected, but you may have more logs and false positives.If you choose a high threshold, some traffic anomaly attacks may not be detected, but you will have fewer logs and false positives.
OKClick OK to save your settings to the Zyxel Device, complete the profile and return to the profile summary page.
CancelClick Cancel to return to the profile summary page without saving any changes.
SaveClick Save to save the configuration to the Zyxel Device but remain in the same page. You may then go to the another profile screen (tab) in order to complete the profile. Click OK in the final profile screen to complete the profile.

30.5.4 Protocol Anomaly Profiles

Protocol anomalies are packets that do not comply with the relevant RFC (Request For Comments). Protocol anomaly detection includes:

  • TCP Decoder
  • UDP Decoder
  • ICMP Decoder
  • IP Decoder

Teardrop

When an IP packet is larger than the Maximum Transmission Unit (MTU) configured in the Zyxel Device, it is fragmented using the TCP or ICMP protocol.

A Teardrop attack falsifies the offset which defines the size of the fragment and the original packet. A series of IP fragments with overlapping offset fields can cause some systems to crash, hang, or reboot when fragment reassembling is attempted at the destination.

IP Spoofing

IP Spoofing is used to gain unauthorized access to network devices by modifying packet headers so that it appears that the packets originate from a host within a trusted network.

  • In an IP Spoof from the WAN, the source address appears to be in the same subnet as a Zyxel Device LAN interface.
  • In an IP Spoof from a LAN interface, the source address appears to be in a different subnet from that Zyxel Device LAN interface.

Figure 392 Configuration > Security Policy > ADP > Profile > Add-Protocol-Anomaly
Edit Anomaly Profile Traffic Anomaly Protocol Anomaly General Name: ADP_PROFILE Description: TCP Decoder Status Name ▲ Log Action 1 {tcp_decoder) BAD-LENGTH-OPTI... log.drop 2 {tcp_decoder) EXPERIMENTAL-OP... logdrop 3 {tcp_decoder) OBSOLETE-OPTION... logdrop 4 {tcp_decoder) OVERSIZE-OFFSET ... logdrop 5 {tcp_decoder) TRUNCATED-OPTI... logdrop 6 {tcp_decoder) TTCP-DETECTED AT... logdrop 7 {tcp_decoder) UNDERSIZE-LEN ATT... logdrop 8 {tcp_decoder) UNDERSIZE-OFFSET ... logdrop 9 {tcp_decoder) lcp-fragment ATT... logdrop Page 1 of 1 > Show 50

The following table describes the labels in this screen. Table 235 Configuration > Security Policy > Session Control
LABEL DESCRIPTION
General Settings
UDP Session Time OutSet how many seconds the Zyxel Device will allow a UDP session to remain idle (without UDP traffic) before closing it.
Session Limit Settings
Enable Session limitSelect this check box to control the number of concurrent sessions hosts can have.
IPv4 / IPv6 ConfigurationThis table lists the rules for limiting the number of concurrent sessions hosts can have.
Default Session per HostThis field is configurable only when you enable session limit.Use this field to set a common limit to the number of concurrent NAT/Security Policy sessions each client computer can have.If only a few clients use peer to peer applications, you can raise this number to improve their performance. With heavy peer to peer application use, lower this number to ensure no single client uses too many of the available NAT sessions.Create rules below to apply other limits for specific users or addresses.
AddClick this to create a new entry. Select an entry and click Add to create a new entry after the selected entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
MoveTo change a rule's position in the numbered list, select the rule and click Move to display a field to type a number for where you want to put that rule and press [ENTER] to move the rule to the number that you typed.The ordering of your rules is important as they are applied in order of their numbering.
#This field is a sequential value showing the number of the profile. The profile order is not important.
StatusThis icon is lit when the entry is active and dimmed when the entry is inactive.
#This is the index number of a session limit rule. It is not associated with a specific rule.
UserThis is the user name or user group name to which this session limit rule applies.
IPv4 / IPv6 AddressThis is the IPv4 / IPv6 address object, including geographic address (group) objects to which this session limit rule applies.
DescriptionThis is the information configured to help you identify the rule.
LimitThis is how many concurrent sessions this user or address is allowed to have.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

30.6.1 The Session Control Add/Edit Screen

Click Configuration > Security Policy > Session Control and the Add or Edit icon to display the Add or Edit screen. Use this screen to configure rules that define a session limit for specific users or addresses. Figure 394 Configuration > Security Policy > Session Control > Edit ![](images/a45ab0ef1677c00f4e09a62317f55d87cf8b9ab926f79aca1f7222cd33cff859.jpg) The following table describes the labels in this screen. Table 236 Configuration > Security Policy > Session Control > Add / Edit
LABEL DESCRIPTION
Create new ObjectUse to configure new settings for User or Address objects that you need to use in this screen.Click on the down arrow to see the menu.
Enable Rule Selectthis check box to turn on this session limit rule.
DescriptionEnter information to help you identify this rule. Use up to 60 printable ASCII characters. Spaces are allowed.
UserSelect a user name or user group to which to apply the rule. The rule is activated only when the specified user logs into the system and the rule will be disabled when the user logs out.Otherwise, select any and there is no need for user logging.Note: If you specified an IP address (or address group) instead of any in the field below, the user's IP address should be within the IP address range.
AddressSelect the IPv4 source address or address group, including geographic address (group) object, to which this rule applies. Select any to apply the rule to all IPv4 source addresses.
IPv6 AddressSelect the IPv6 source address or address group, including geographic address (group) object, to which this rule applies. Select any to apply the rule to all IPv6 source addresses.
Session Limit per HostUse this field to set a limit to the number of concurrent NAT/Security Policy sessions this rule's users or addresses can have.For this rule's users and addresses, this setting overrides the Default Session per Host setting in the general Security Policy Session Control screen.
OKClick OK to save your customized settings and exit this screen.
CancelClick Cancel to exit this screen without saving.

30.7 Security Policy Example Applications

Suppose you decide to block LAN users from using IRC (Internet Relay Chat) through the Internet. To do this, you would configure a LAN to WAN Security Policy that blocks IRC traffic from any source IP address from going to any destination address. You do not need to specify a schedule since you need the Security Policy to always be in effect. The following figure shows the results of this policy. Figure 395 Blocking All LAN to WAN IRC Traffic Example ![](images/a135eae85a9cca13a57ca7a7196f7a5bc87bcecba84166f656f8d66afc38d591.jpg)
flowchart
graph LR
    A["LAN"] --> B((Data Link))
    C["LAN"] --> B
    D["LAN"] --> B
    E["Internet"] --> F["IRC"]
    G["WAN"] --> F
    B --> H["Data Link"]
    H --> I["Network"]
    I --> J["Internet"]
Your Security Policy would have the following settings. Table 237 Blocking All LAN to WAN IRC Traffic Example
#USERSOURCEDESTINATIONSCHEDULESERVICEACTION
1 Any Any Any IRC Deny
2 Any Any Any Any Allow
- The first row blocks LAN access to the IRC service on the WAN. - The second row is the Security Policy's default policy that allows all LAN1 to WAN traffic. The Zyxel Device applies the security policies in order. So for this example, when the Zyxel Device receives traffic from the LAN, it checks it against the first policy. If the traffic matches (if it is IRC traffic) the security policy takes the action in the policy (drop) and stops checking the subsequent security policies. Any traffic that does not match the first security policy will match the second security policy and the Zyxel Device forwards it. Now suppose you need to let the CEO use IRC. You configure a LAN1 to WAN security policy that allows IRC traffic from the IP address of the CEO's computer. You can also configure a LAN to WAN policy that allows IRC traffic from any computer through which the CEO logs into the Zyxel Device with his/her user name. In order to make sure that the CEO's computer always uses the same IP address, make sure it either: \- Has a static IP address, or \- You configure a static DHCP entry for it so the Zyxel Device always assigns it the same IP address. Now you configure a LAN1 to WAN security policy that allows IRC traffic from the IP address of the CEO's computer (172.16.1.7 for example) to go to any destination address. You do not need to specify a schedule since you want the security policy to always be in effect. The following figure shows the results of your two custom policies. Figure 396 Limited LAN to WAN IRC Traffic Example ![](images/e3481cb0af49e7cb493e758a85cab5721e0d04518ae55f228b9059eec7a70258.jpg)
flowchart
graph LR
    LAN1["LAN 1"] -->|CEO 172.16.1.7| WAN["WAN"]
    LAN1 -->|TCP| Network["Network"]
    LAN1 -->|TCP| Internet["Internet"]
    LAN1 -->|TCP| Internet
    LAN1 -->|TCP| Internet
    LAN1 -->|TCP| Internet
    LAN1 -->|TCP| Internet
    LAN1 -->|TCP| Internet
    LAN1 -->|TCP| Internet
    LAN1 -->|TCP| Internet
    LAN1 -->|TCP| Internet
    LAN1 -->|TCP| Internet
    LAN1 -->|TCP| Internet
    LAN1 -->|TCP| Internet
    LAN1 -->|TCP| Internet
Your security policy would have the following configuration. Table 238 Limited LAN1 to WAN IRC Traffic Example 1
# USER SOURCE DESTINATION SCHEDULE SERVICE ACTION
1Any172.16.1.7AnyAnyIRCAllow
2AnyAnyAnyAnyIRCDeny
3AnyAnyAnyAnyAnyAllow
- The first row allows the LAN1 computer at IP address 172.16.1.7 to access the IRC service on the WAN. - The second row blocks LAN1 access to the IRC service on the WAN. - The third row is the default policy of allowing all traffic from the LAN1 to go to the WAN. Alternatively, you configure a LAN1 to WAN policy with the CEO's user name (say CEO) to allow IRC traffic from any source IP address to go to any destination address. Your Security Policy would have the following settings. Table 239 Limited LAN1 to WAN IRC Traffic Example 2
#USERSOURCEDESTINATIONSCHEDULESERVICEACTION
1CEOAnyAnyAnyIRCAllow
2AnyAnyAnyAnyIRCDeny
3AnyAnyAnyAnyAnyAllow
- The first row allows any LAN1 computer to access the IRC service on the WAN by logging into the Zyxel Device with the CEO's user name. - The second row blocks LAN1 access to the IRC service on the WAN. - The third row is the default policy of allowing allows all traffic from the LAN1 to go to the WAN. The policy for the CEO must come before the policy that blocks all LAN1 to WAN IRC traffic. If the policy that blocks all LAN1 to WAN IRC traffic came first, the CEO's IRC traffic would match that policy and the Zyxel Device would drop it and not check any other security policies.

CHAPTER 31

Application Patrol

31.1 Overview

Application patrol provides a convenient way to manage the use of various applications on the network. It manages general protocols (for example, HTTP and FTP) and instant messenger (IM), peer-to-peer (P2P), Voice over IP (VoIP), and streaming (RSTP) applications. You can even control the use of a particular application's individual features (like text messaging, voice, video conferencing, and file transfers).

31.1.1 What You Can Do in this Chapter

- Use the App Patrol summary screen (see Section 31.2 on page 587) to manage the application patrol profiles. You can also view license registration and signature information. - Use the App Patrol Add/Edit screens (see Section 31.2.2 on page 591 & Section 31.2.3 on page 592) to set actions for application categories and for specific applications within the category.

31.1.2 What You Need to Know

If you want to use a service, make sure both the Security Policy and application patrol allow the service's packets to go through the Zyxel Device. Note: The Zyxel Device checks secure policies before it checks application patrol rules for traffic going through the Zyxel Device. Application patrol examines every TCP and UDP connection passing through the Zyxel Device and identifies what application is using the connection. Then, you can specify whether or not the Zyxel Device continues to route the connection. Traffic not recognized by the application patrol signatures is ignored.

Application Profiles & Policies

An application patrol profile is a group of categories of application patrol signatures. For each profile, you can specify the default action the Zyxel Device takes once a packet matches a signature (forward, drop, or reject a service's connections and/or create a log alert). Use policies to link profiles to traffic flows based on criteria such as source zone, destination zone, source address, destination address, schedule, user.

Classification of Applications

There are two ways the Zyxel Device can identify the application. The first is called auto. The Zyxel Device looks at the IP payload (OSI level-7 inspection) and attempts to match it with known patterns for specific applications. Usually, this occurs at the beginning of a connection, when the payload is more consistent across connections, and the Zyxel Device examines several packets to make sure the match is correct. Before confirmation, packets are forwarded by App Patrol with no action taken. The number of packets inspected before confirmation varies by signature. Note: The Zyxel Device allows the first eight packets to go through the security policy, regardless of the application patrol policy for the application. The Zyxel Device examines these first eight packets to identify the application. The second approach is called service ports. The Zyxel Device uses only OSI level-4 information, such as ports, to identify what application is using the connection. This approach is available in case the Zyxel Device identifies a lot of "false positives" for a particular application.

Custom Ports for SIP and the SIP ALG

Configuring application patrol to use custom port numbers for SIP traffic also configures the SIP ALG to use the same port numbers for SIP traffic. Likewise, configuring the SIP ALG to use custom port numbers for SIP traffic also configures application patrol to use the same port numbers for SIP traffic.

31.2 Application Patrol Profile

Use the application patrol screens to customize action and log settings for a group of application patrol signatures. You then link a profile to a policy. Use this screen to create an application patrol profile, and view signature information. It also lists the registration status and details about the signature set the Zyxel Device is using. Note: You must register for the AppPatrol signature service (at least the trial) before you can use it. A profile is an application object(s) or application group(s) that has customized action and log settings. Click Configuration > Security Service > App Patrol to open the following screen. Click the Application Patrol icon for more information on the Zyxel Device's security features. Figure 397 Configuration > Security Service > App Patrol ![](images/1c3fe5c23206a5520dbd70d9515caf1846705ab99dfb8d3e2b485108b7431da4.jpg) The following table describes the labels in this screen. Table 240 Configuration > Security Service > App Patrol
LABEL DESCRIPTION
AddClick this to create a new entry. Select an entry and click Add to create a new entry after the selected entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveSelect an entry and click Remove to delete the selected entry.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry. Click Refresh to update information on this screen.
#This field is a sequential value showing the number of the profile. The profile order is not important.
Name This displays the name of the profile created.
Description This displays the description of the App Patrol Profile.
Scan OptionThis field displays the scan options from the App Patrol profile.
Reference This displays the number of times an object reference is used in a profile.
Action Click this icon to apply the entry to a security policy.Go to theConfiguration > Security Policy > Policy Controlscreen to check the result.
Signature InformationThe following fields display information on the current signature set that the Zyxel Device is using.
Current VersionThis field displays the App Patrol signature set version number. This number gets larger as the set is enhanced.
Signature NumberThis field displays the number of IDP signatures in this set. This number usually gets larger as the set is enhanced. Older signatures and rules may be removed if they are no longer applicable or have been supplanted by newer ones.
Released Date This field displays the date and time the set was released.
Update SignaturesClick this link to go to the screen you can use to download signatures from the update server.

31.2.1 Profile Action: Apply to a Security Policy

Click the icon in the Action field of an existing application patrol file to apply the profile to a security policy. Go to the Configuration > Security Policy > Policy Control screen to check the result. Figure 398 Configuration > Security Service > App Patrol > Action ![](images/d1757e4e8a02799643a397a97ca9639b8c8401d02f71a0442b65406c1f15d2e1.jpg) The following table describes the labels in this screen. Table 241 Configuration > Security Service > App Patrol > Action
LABEL DESCRIPTION
Show Filter/Hide FilterClick Show Filter to display IPv4 and IPv6 (if enabled) security policy search filters.
IPv4 / IPv6 ConfigurationUse IPv4 / IPv6 search filters to find specific IPv4 and IPv6 (if enabled) security policies based on direction, application, user, source, destination and/or schedule.
From / ToSelect a zone to view all security policies from a particular zone and/or to a particular zone.any means all zones.
Table 241 Configuration > Security Service > App Patrol > Action
LABELDESCRIPTION
IPv4 / IPv6 SourceType an IPv4 or IPv6 IP address to view all security policies based on the IPv4 / IPv6 source address object used.An IPv4 IP address is written as four integer blocks separated by periods. This is an example IPv4 address: 172.16.6.7.An 128-bit IPv6 address is written as eight 16-bit hexadecimal blocks separated by colons (:). This is an example IPv6 address: 2001:0db8:1a2b:0015:0000:0000:1a2f:0000.
IPv4 / IPv6 DestinationType an IPv4 or IPv6 IP address to view all security policies based on the IPv4 / IPv6 destination address object used.An IPv4 IP address is written as four integer blocks separated by periods. This is an example IPv4 address: 172.16.6.7.An 128-bit IPv6 address is written as eight 16-bit hexadecimal blocks separated by colons (:). This is an example IPv6 address: 2001:0db8:1a2b:0015:0000:0000;1a2f:0000.
Service View all security policies based the service object used.
User View all security policies based on user or user group object used.
Schedule View all security policies based on the schedule object used.
PriorityThis is the position of your Security Policy in the global policy list (including all through-Zyxel Device and to-Zyxel Device policies). The ordering of your policies is important as policies are applied in sequence.Default displays for the default Security Policy behavior that the Zyxel Device performs on traffic that does not match any other Security Policy.
Status This icon is lit when the entry is active and dimmed when the entry is inactive.
Name This is the name of the Security policy.
From / ToThis is the direction of travel of packets. Select from which zone the packets come and to which zone they go.Security Policies are grouped based on the direction of travel of packets to which they apply. For example, from LAN to LAN means packets traveling from a computer or subnet on the LAN to either another computer or subnet on the LAN.From any displays all the Security Policies for traffic going to the selected To Zone.To any displays all the Security Policies for traffic coming from the selected From Zone.From any to any displays all of the Security Policies.To ZyWALL policies are for traffic that is destined for the Zyxel Device and control which computers can manage the Zyxel Device.
IPv4 / IPv6 SourceThis displays the IPv4 / IPv6 source address object, including geographic address and FQDN (group) objects, to which this Security Policy applies.
IPv4 / IPv6 DestinationThis displays the IPv4 / IPv6 destination address object, including geographic address and FQDN (group) objects, to which this Security Policy applies.
ServiceThis displays the service object to which this Security Policy applies.
UserThis is the user name or user group name to which this Security Policy applies.
ScheduleThis field tells you the schedule object that the policy uses. none means the policy is active at all times if enabled.
ActionThis field displays whether the Security Policy silently discards packets without notification (deny), permits the passage of packets (allow) or drops packets with notification (reject)
LogSelect whether to have the Zyxel Device generate a log (log), log and alert (log alert) or not (no) when the policy is matched to the criteria listed above.
ProfileThis field shows you which Security Service profiles (application patrol, content filter, IDP, anti-malware, email security) apply to this Security policy. Click an applied Security Service profile icon to edit the profile directly.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

31.2.2 Application Patrol Profile > Add/Edit - My Application

Use this screen to configure profile settings. Click Configuration > Security Service > App Patrol > Add/Edit, then click My Application to open the following screen. Figure 399 Configuration > Security Service > App Patrol > Add/Edit > My Application ![](images/5dc5c85364731d59132bdec1f3021f3a03cd1d987d02f692b66ff4cc33da957d.jpg) The following table describes the labels in this screen. Table 242 Configuration > Security Service > App Patrol > Add/Edit > My Application
LABEL DESCRIPTION
General Settings
NameType the name of the profile. You may use 1-31 alphanumeric characters, underscores( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive. These are valid, unique profile names:My Profilem Y ProfileM y m y 1 2 _ 3 - 4These are invalid profile names:1mYProfileMy ProfileMyProfile?Whatalongprofilename123456789012
DescriptionType a description for the profile rule to help identify the purpose of rule. You may use 1-31 alphanumeric characters, underscores ( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive. This field is optional.
Total Category(s)This field displays the total number of the selected category(ies) in the Query Result screen.
Total Application(s)This field displays the total number of the selected applications in the Query Result screen.
RemoveSelect an entry and click Remove to delete the selected entry.
LogSelect whether to have the Zyxel Device generate a log (log), log and alert (log alert) or neither (no) by default when traffic matches a signature in this category.
Action Select the default action for all signatures in this category.forward - the Zyxel Device routes packets that matches these signatures.drop - the Zyxel Device silently drops packets that matches these signatures without notification.reject - the Zyxel Device drops packets that matches these signatures and sends notification.
#This field is a sequential value showing the number of the profile. The profile order is not important.
Application This field displays the application name of the policy.
CategoryThis field displays the category type of the application.
Tag This field displays the tag information of the application.
Action Select the default action for all signatures in this category.forward - the Zyxel Device routes packets that matches these signatures.drop - the Zyxel Device silently drops packets that matches these signatures without notification.reject - the Zyxel Device drops packets that matches these signatures and sends notification.
LogSelect whether to have the Zyxel Device generate a log (log), log and alert (log alert) or neither (no) by default when traffic matches a signature in this category.
Save & ExitA profile consists of separate category editing screens. If you want to configure just one category for a profile, click OK to save your settings to the Zyxel Device, complete the profile and return to the profile summary page.
CancelClick Cancel to return to the profile summary page without saving any changes.
SaveIf you want to configure more than one category for a profile, click Save to save your settings to the Zyxel Device without leaving this page.

31.2.3 Application Patrol Profile > Add/Edit - Query Result

Click Configuration > Security Service > App Patrol > Add, then click Query Result to search for certain applications within a specific category, and the selected applications will be added to My Application screen. You can also click an existing profile, click Edit (or double-click it), then click Query Result to open the following screen. Figure 400 Configuration > Security Service > App Patrol > Add/Edit > Query Result ![](images/4486fc311d1c584cff4238dc46c4bec69ead5251cc9faf2214ef52303b960272.jpg) The following table describes the labels in this screen. Table 243 Configuration > Security Service > App Patrol > Add/Edit > Query Result
LABEL DESCRIPTION
General Settings
NameType the name of the profile. You may use 1-31 alphanumeric characters, underscores( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive. These are valid, unique profile names:My Profilem Y ProfileM y m y 1 2 _ 3 - 4These are invalid profile names:1mYProfileMy ProfileMyProfile?Whatalongprofilename123456789012
DescriptionType a description for the profile rule to help identify the purpose of rule. You may use 1-31 alphanumeric characters, underscores ( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive. This field is optional.
Search Application(s) By NameEnter a name to search for relevant applications.
Search Application(s) By CategorySelect a category(ies) below to search for relevant applications.
Filter by TagsAdd or delete a tag(s) to display or not display an application(s).
#This field is a sequential value showing the number of the profile. The profile order is not important.
Application This field displays the application name of the policy.
CategoryThis field displays the category type of the application.
Tag This field displays the tag information of the policy.
Action Select the default action for all signatures in this category.
LogSelect whether to have the Zyxel Device generate a log (log), log and alert (log alert) or neither (no) by default when traffic matches a signature in this category.
Add to My ApplicationSelect an application(s) to show in the My Application profile screen.
ResetClick this button to reset the fields to default settings.
CancelClick Cancel to return to the profile summary page without saving any changes.

CHAPTER 32

Content Filter

32.1 Overview

Use the content filtering feature to control access to specific web sites or web content.

32.1.1 What You Can Do in this Chapter

- Use the Filter Profile screens (Section 32.2 on page 597) to set up content filtering profiles. - Use the Trusted Web Sites screens (Section 32.3 on page 616) to create a common list of good (allowed) web site addresses. - Use the Forbidden Web Sites screens (Section 32.4 on page 617) to create a common list of bad (blocked) web site addresses.

32.1.2 What You Need to Know

Content Filtering

Content filtering allows you to block certain web features, such as cookies, and/or block access to specific web sites. It can also block access to specific categories of web site content. You can create different content filter policies for different addresses, schedules, users or groups and content filter profiles. For example, you can configure one policy that blocks John Doe's access to arts and entertainment web pages during the workday and another policy that lets him access them after work.

Content Filtering Policies

A content filtering policy allows you to do the following. - Use schedule objects to define when to apply a content filter profile. - Use address and/or user/group objects to define to whose web access to apply the content filter profile. - Apply a content filter profile that you have custom-tailored.

Content Filtering Profiles

A content filtering profile conveniently stores your custom settings for the following features. • Category-based Blocking The Zyxel Device can block access to particular categories of web site content, such as pornography or racial intolerance. \- Restrict Web Features The Zyxel Device can disable web proxies and block web features such as ActiveX controls, Java applets and cookies. \- Customize Web Site Access You can specify URLs to which the Zyxel Device blocks access. You can alternatively block access to all URLs except ones that you specify. You can also have the Zyxel Device block access to URLs that contain particular keywords.

Content Filtering Configuration Guidelines

When the Zyxel Device receives an HTTP request, the content filter searches for a policy that matches the source address and time (schedule). The content filter checks the policies in order (based on the policy numbers). When a matching policy is found, the content filter allows or blocks the request depending on the settings of the filtering profile specified by the policy. Some requests may not match any policy. The Zyxel Device allows the request if the default policy is not set to block. The Zyxel Device blocks the request if the default policy is set to block.

External Web Filtering Service

When you register for and enable the external web filtering service, your Zyxel Device accesses an external database that has millions of web sites categorized based on content. You can have the Zyxel Device block, block and/or log access to web sites based on these categories.

HTTPS Domain Filter

HTTPS Domain Filter works with the Content Filter category feature to identify HTTPS traffic and take appropriate action. SSL Inspection identifies HTTPS traffic for all Security Service traffic and has higher priority than HTTPS Domain Filter. HTTPS Domain Filter only identifies keywords in the domain name of an URL and matches it to a category. For example, if the keyword is 'picture' and the URL is http://www.google.com/picture/index.htm, then HTTPS Domain Filter cannot identify 'picture' because that keyword in not in the domain name 'www.google.com'. However, SSL Inspection can identify 'picture' in the URL http://www.google.com/picture/index.htm.

Keyword Blocking URL Checking

The Zyxel Device checks the URL's domain name (or IP address) and file path separately when performing keyword blocking. The URL's domain name or IP address is the characters that come before the first slash in the URL. For example, with the URL www.zyxel.com.tw/news/pressroom.php, the domain name is www.zyxel.com.tw. The file path is the characters that come after the first slash in the URL. For example, with the URL www.zyxel.com.tw/news/pressroom.php, the file path is news/pressroom.php. Since the Zyxel Device checks the URL's domain name (or IP address) and file path separately, it will not find items that go across the two. For example, with the URL www.zyxel.com.tw/news/pressroom.php, the Zyxel Device would find "tw" in the domain name (www.zyxel.com.tw). It would also find "news" in the file path (news/pressroom.php) but it would not find "tw/news".

Finding Out More

• See Section 32.5 on page 618 for content filtering background/technical information.

32.1.3 Before You Begin

- You must configure an address object, a schedule object and a filtering profile before you can set up a content security policy. - You must have Content Filtering license in order to use the function.subscribe to use the external database content filtering (see the Licensing > Registration screens).

32.2 Content Filter Profile Screen

Click Configuration > Security Service> Content Filter > Profile to open the Content Filter Profile screen. Use this screen to enable content filtering, view and order your list of content filter policies, create a denial of access message or specify a redirect URL and check your external web filtering service registration status. Click the Content Filter icon for more information on the Zyxel Device's security features. Figure 401 Configuration > Security Service > Content Filter > Profile ![](images/9bf103370beaafbaed738f9f691f2aabc2cda57362a04de1783dbed976890bbd.jpg) The following table describes the labels in this screen. Table 244 Configuration > Security Service > Content Filter > Profile
LABEL DESCRIPTION
General Settings
Enable HTTPS Domain Filter for HTTPS trafficSelect this check box to have the Zyxel Device block HTTPS web pages using the cloud category service.In an HTTPS connection, the Zyxel Device can extract the Server Name Indication (SNI) from a client request, check if it matches a category in the cloud content filter and then take appropriate action. The keyword match is for the domain name only.
Enable Content Filter HTTPS Domain Filter Block/Warn PageUse this field to have the Zyxel Device display a warning page instead of a blank page when an HTPPS connection is redirected.
Block/Warn Page PortUse the default port number as displayed for the warning page. If you change it, the new port number should be unique.
Drop connection when HTTPS connection with SSL V3 or previous versionSelect this check box to have the Zyxel Device block HTTPS web pages using SSL V3 or a previous version.
Content Filter Category Service TimeoutSpecify the allowable time period in seconds for accessing the external web filtering service's server.
Denied Access MessageEnter a message to be displayed when content filter blocks access to a web page. Use up to 127 characters (0-9a-zA-Z;/?:@&+\._l~*')%), For example, "Access to this web page is not allowed. Please contact the network administrator".It is also possible to leave this field blank if you have a URL specified in the Redirect URL field. In this case if the content filter blocks access to a web page, the Zyxel Device just opens the web page you specified without showing a denied access message.
Redirect URLEnter the URL of the web page to which you want to send users when their web access is blocked by content filter. The web page you specify here opens in a new frame below the denied access message.Use "http://" or "https://" followed by up to 262 characters (0-9a-zA-Z;/?:@&+\._l~*')%). For example, http://192.168.1.17/blocked access.
Profile Management
Add Click Add to createa new content filter rule.
Edit Click Edit to make changes to a content filter rule.
Remove Click Remove the delete a content filter rule.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry. Click Refresh to update information on this screen.
#This column lists the index numbers of the content filter profile.
Name This column lists the names of the content filter profile rule.
DescriptionThis column lists the description of the content filter profile rule.
Reference This displays the number of times an Object Reference is used in a rule.
ActionClick this icon to apply the content filter profile with a security policy.Go to theConfiguration > Security Policy > Policy Controlscreen to check the result.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

32.2.1 Apply to a Security Policy

Click the icon in the Action field to apply the entry to a security policy. Go to the Configuration > Security Policy > Policy Control screen to check the result. Figure 402 Configuration > Security Service > Content Filter > Action ![](images/1330c10beebaabca05712c9326143b13605420a647c0dc1231024354b65714bd.jpg) The following table describes the labels in this screen. Table 245 Configuration > Security Service > Content Filter > Action
LABEL DESCRIPTION
Show Filter/Hide FilterClick Show Filter to display IPv4 and IPv6 (if enabled) security policy search filters.
IPv4 / IPv6 ConfigurationUse IPv4 / IPv6 search filters to find specific IPv4 and IPv6 (if enabled) security policies based on direction, application, user, source, destination and/or schedule.
From / ToSelect a zone to view all security policies from a particular zone and/or to a particular zone.any means all zones.
Table 245 Configuration > Security Service > Content Filter > Action
LABELDESCRIPTION
IPv4 / IPv6 SourceType an IPv4 or IPv6 IP address to view all security policies based on the IPv4 / IPv6 source address object used.An IPv4 IP address is written as four integer blocks separated by periods. This is an example IPv4 address: 172.16.6.7.An 128-bit IPv6 address is written as eight 16-bit hexadecimal blocks separated by colons (:). This is an example IPv6 address: 2001:0db8:1a2b:0015:0000:0000:1a2f:0000.
IPv4 / IPv6 DestinationType an IPv4 or IPv6 IP address to view all security policies based on the IPv4 / IPv6 destination address object used.An IPv4 IP address is written as four integer blocks separated by periods. This is an example IPv4 address: 172.16.6.7.An 128-bit IPv6 address is written as eight 16-bit hexadecimal blocks separated by colons (:). This is an example IPv6 address: 2001:0db8:1a2b:0015:0000:0000;1a2f:0000.
Service View all security policies based the service object used.
User View all security policies based on user or user group object used.
Schedule View all security policies based on the schedule object used.
PriorityThis is the position of your Security Policy in the global policy list (including all through-Zyxel Device and to-Zyxel Device policies). The ordering of your policies is important as policies are applied in sequence.Default displays for the default Security Policy behavior that the Zyxel Device performs on traffic that does not match any other Security Policy.
Status This icon is lit when the entry is active and dimmed when the entry is inactive.
Name This is the name of the Security policy.
From / ToThis is the direction of travel of packets. Select from which zone the packets come and to which zone they go.Security Policies are grouped based on the direction of travel of packets to which they apply. For example, from LAN to LAN means packets traveling from a computer or subnet on the LAN to either another computer or subnet on the LAN.From any displays all the Security Policies for traffic going to the selected To Zone.To any displays all the Security Policies for traffic coming from the selected From Zone.From any to any displays all of the Security Policies.To ZyWALL policies are for traffic that is destined for the Zyxel Device and control which computers can manage the Zyxel Device.
IPv4 / IPv6 SourceThis displays the IPv4 / IPv6 source address object, including geographic address and FQDN (group) objects, to which this Security Policy applies.
IPv4 / IPv6 DestinationThis displays the IPv4 / IPv6 destination address object, including geographic address and FQDN (group) objects, to which this Security Policy applies.
ServiceThis displays the service object to which this Security Policy applies.
UserThis is the user name or user group name to which this Security Policy applies.
ScheduleThis field tells you the schedule object that the policy uses. none means the policy is active at all times if enabled.
ActionThis field displays whether the Security Policy silently discards packets without notification (deny), permits the passage of packets (allow) or drops packets with notification (reject)
LogSelect whether to have the Zyxel Device generate a log (log), log and alert (log alert) or not (no) when the policy is matched to the criteria listed above.
ProfileThis field shows you which Security Service profiles (application patrol, content filter, IDP, anti-malware, email security) apply to this Security policy. Click an applied Security Service profile icon to edit the profile directly.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

32.2.2 Content Filter Add Profile Category Service

Click Configuration > Security Service > Content Filter > Profile > Add or Edit to open the Add Filter Profile screen. Figure 403 Content Filter > Profile > Add Filter Profile > Category Service ![](images/9c2614acbe2c6687c0db5aacc2d58c9ab7f7c616cfd26dd53d1cf5c4f721fe0f.jpg) The following table describes the labels in this screen. Table 246 Configuration > Security Service > Content Filter > Profile > Add > Category Service
LABEL DESCRIPTION
NameEnter a descriptive name for this content filtering profile name. You may use 1-31 alphanumeric characters, underscores(_, or dashes (-), but the first character cannot be a number. This value is case-sensitive.
DescriptionEnter a description for the content filtering profile rule to help identify the purpose of rule. You may use 1-31 alphanumeric characters, underscores(_, or dashes (-), but the first character cannot be a number. This value is case-sensitive.This field is optional.
Enable SafeSearchSafeSearch is a search engine that can automatically filter sexually explicit videos and images from the search result without overloading the Zyxel Device. It does this by adding a parameter in the search URL:https://www.google.com.tw/?gws_rd=ssl#q=porn&safe=active.Supported search engines at the time of writing are:Yahoo, Google, MSN Live Bing, Yandex
Enable Content Filter Category ServiceEnable external database content filtering to have the Zyxel Device check an external database to find to which category a requested web page belongs. The Zyxel Device then blocks or forwards access to the web page depending on the configuration of the rest of this page.
Log all web pagesSelect this to record attempts to access web pages when:They match the other categories that you select below.They are not categorized.The external content filtering database is unavailable.
Action for Managed Web PagesSelect Pass to allow users to access web pages that match the other categories that you select below.Select Block to prevent users from accessing web pages that match the other categories that you select below. When external database content filtering blocks access to a web page, it displays the denied access message that you configured in theContent Filter Generalscreen along with the category of the blocked web page.Select Log to record attempts to access web pages that match the other categories that you select below.
Action for Unrated Web PagesSelect Pass to allow users to access web pages that the external web filtering service has not categorized.Select Block to prevent users from accessing web pages that the external web filtering service has not categorized. When the external database content filtering blocks access to a web page, it displays the denied access message that you configured in theContent Filter Generalscreen along with the category of the blocked web page.Select Warn to display a warning message before allowing users to access web pages that the external web filtering service has not categorized.Select Log to record attempts to access web pages that are not categorized.
Table 246 Configuration > Security Service > Content Filter > Profile > Add > Category Service
LABEL DESCRIPTION
Action When Category Server Is UnavailableSelect Pass to allow users to access any requested web page if the external content filtering database is unavailable.Select Block to block access to any requested web page if the external content filtering database is unavailable.Select Warn to display a warning message before allowing users to access any requested web page if the external content filtering database is unavailable.The following are possible causes for the external content filtering server not being available:There is no response from the external content filtering server within the time period specified in the Content Filter Server Unavailable Timeout field.The Zyxel Device is not able to resolve the domain name of the external content filtering database.There is an error response from the external content filtering database. This can be caused by an expired content filtering registration (External content filtering's license key is invalid").Select Log to record attempts to access web pages that occur when the external content filtering database is unavailable.
Select Categories
Select All CategoriesSelect this check box to restrict access to all site categories listed below.
Clear All CategoriesSelect this check box to clear the selected categories below.
Managed CategoriesThese are categories of web pages based on their content. Select categories in this section to control access to specific types of Internet content.You must have the Category Service content filtering license to filter these categories. See the next table for category details.
Test Web Site Category
URL to testYou can check which category a web page belongs to. Enter a web site URL in the text box.When the content filter is active, you should see the web page's category. The query fails if the content filter is not active.Content Filtering can query a category by full URL string (for example, http://www.google.com/picture/index.htm), but HTTPS Domain Filter can only query a category by domain name ('www.google.com'), so the category may be different in the query result. URL to test displays both results in the test.
If you think the category is incorrectClick this link to see the category recorded in the Zyxel Device's content filtering database for the web page you specified (if the database has an entry for it).
Test Against Content Filter Category ServerClick this button to see the category recorded in the external content filter server's database for the web page you specified.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving your changes.
The following table describes the managed categories. Table 247 Managed Category Descriptions
CATEGORY DESCRIPTION
Adult TopicsWeb pages that contain content or themes that are generally considered unsuitable for children.
AlcoholWeb pages that mainly sell, promote, or advocate the use of alcohol, such as beer, wine, and liquor.This category also includes cocktail recipes and home-brewing instructions.
Anonymizing UtilitiesWeb pages that result in anonymous web browsing without the explicit intent to provide such a service.This category includes URL translators, web-page caching, and other utilities that might function as anonymizers, but without the express purpose of bypassing filtering software.This category does not include text translation.
Art Culture HeritageWeb pages that contain virtual art galleries, artist sites (including sculpture and photography), museums, ethnic customs, and country customs.This category does not include online photograph albums.
Auctions ClassifiedsWeb pages that provide online bidding and selling of items or services.This category includes web pages that focus on bidding and sales.This category does not include classified advertisements such as real estate postings, personal ads, or companies marketing their auctions.
Blogs/WikiWeb pages containing dynamic content, which often changes because users can post or edit content at any time.This category covers the risks with dynamic content that might range from harmless to offensive.
BusinessWeb pages that provide business-related information, such as corporate overviews or business planning and strategies.This category also includes information, services, or products that help other businesses plan, manage, and market their enterprises, and multi-level marketing.This category does not include personal pages and web-hosting web pages.
Chat Web pages that provide web-based, real-time social messaging in public and private chat rooms. This category includes IRC.This category does not include instant messaging.
Computing InternetWeb pages containing reviews, information, buyer's guides of computers, computer parts and accessories, computer software and internet companies, industry news and magazines, and pay-to-surf sites.
Consumer Protection Websitesthat try to rob or cheat consumers.Some examples of their activities include selling counterfeit products, selling products that were originally provided for free, or improperly using the brand of another company. This category also includes sites where many consumers reported being cheated or not receiving services.This category does not include phishing, which tries to perpetrate fraud or theft by stealing account information.
Content ServerURLs for servers that host images, media files, or JavaScript for one or more sites and are intended to speed up content retrieval for existing web servers, such as Apache.This category includes domain-level and sub-domain-level URLs that function as content servers.This category does not include:Web pages for businesses that provide the content serversWeb pages that allow users to browse photographs. See the Media Sharing category.URLs for servers that serve only advertisements. See the Web Ads category.
Controversial OpinionsWeb pages that contain opinions that are likely to offend political or social sensibilities and incite controversy. Much of this content is at the extremes of public opinion.This category does not include opinion or language clearly intended to promote hate or discrimination.
Cult Occult Sites relating to non-traditional religious practices considered to be false, unorthodox, extremist, or coercive.
Dating PersonalsWeb pages that provide networking for online dating, matchmaking, escort services, or introductions to potential spouses.This category does not include sites that provide social networking that might include dating, but are not specific to dating.
Dating Social NetworkingWeb pages that focus on social interaction such as online dating, friendship, school reunions, pen-pals, escort services, or introductions to potential spouses.This category does not include wedding-related content, dating tips, or related marketing.
Digital PostcardsWeb pages that allow people to send and receive digital postcards and greeting cards via the Internet.
DiscriminationWeb pages, which provide information that explicitly encourages the oppression or discrimination of a specific group of individuals.This category does not include jokes and humor, unless the focus of the entire site is considered discriminatory.
DrugsWebsites that provide information on the purchase, manufacture, and use of illegal or recreational drugs.This category does not include sites with exclusive health or political themes.
Education ReferenceWeb pages devoted to academic-related content such as academic subjects (mathematics, history), school or university web pages, and education administration pages (school boards, teacher curriculum).
EntertainmentWeb pages that provide information about cinema, theater, music, television, infotainment, entertainment industry gossip-news, and sites about celebrities such as actors and musicians.This category also includes sites where the content is devoted to providing entertainment on the web, such as horoscopes or fan clubs.
ExtremeWeb pages that provide content considered gory, perverse, or horrific.
Fashion BeautyWeb pages that market clothing, cosmetics, jewelry, and other fashion-oriented products, accessories, or services.This category also includes product reviews, comparisons, and general consumer information, and services such as hair salons, tanning salons, tattoo studios, and body-piercing studios.This category does not include fashion-related content such as modeling or celebrity fashion unless the site focuses on marketing the product line.
Finance BankingWeb pages that provide financial information or access to online financial accounts.This category includes stock information (but not stock trading), home finance, and government-related financial information.
For KidsWeb pages that are family-safe, specifically for children of approximate ages ten and under.This category can also be used as an exception to allow web pages that do not pose a risk to children, or to access sites that have a primary educational or recreational focus for children, but are in other categories such as Games, Humor/ Comics, Recreation/Hobbies, or Entertainment.
Forum Bulletin BoardsWeb pages that provide access (http://) to Usenet newsgroups or hold discussions and post user-generated content, such as real-time message posting for an interest group. This category also includes archives of files uploaded to newsgroups.This category does not include message forums with a business or technical support focus.
GamblingWeb pages that allow users to wager or place bets online, or provide gambling software that allows online betting, such as casino games, betting pools, sports betting, and lotteries.This category does not include web pages related to gambling that do not allow betting online.
Gambling RelatedWeb pages that offer information about gambling, without providing the means to gamble.This category includes casino-related web pages that do not offer online gambling, gambling links, tips, sports picks, lottery results, and horse, car, or boat racing.
Game Cartoon ViolenceWeb pages that provide fantasy or fictitious representations of violence within the context of games, comics, cartoons, or graphic novels.This category includes images and textual descriptions of physical assaults or hand-to-hand combat, and grave injury and destruction caused by weapons or explosives.
GamesWeb pages that offer online games and related information such as cheats, codes, demos, emulators, online contests or role-playing games, gaming clans, game manufacturer sites, fantasy or virtual sports leagues, and other gaming sites without chances of profit.This category includes gaming consoles.
General NewsWeb pages that provide online news media, such as international or regional news broadcasting and publication.This category includes portal sites that provide news content.
Government MilitaryWeb pages that contain content maintained by governmental or military organizations, such as government branches or agencies, police departments, fire departments, civil defense, counter-terrorism organizations, or supranational organizations, such as the United Nations or the European Union.This category includes military and veterans' medical facilities.
Gruesome ContentWeb pages with content that can be considered tasteless, gross, shocking, or gruesome.This category does not include web pages with content pertaining to physical assault.
HealthWeb pages that cover all health-related information and health care services.This category does not include cosmetic surgery, marketing/selling pharmaceuticals, or animal-related medical services.
Historical RevisionismWeb pages that denounce, or offer different interpretations of, significant historical facts, such as holocaust denial.This category does not include all re-examination of historical facts, only historical events that are highly sensitive.
History Web pages that provide content about historical facts.This category includes content suitable for higher education, but the Education category includes content for primary education. For example, a site with Holocaust photographs might be offensive, but have academic value.
Humor Comics Web pages thatprovide comical or funny content.This category includes sites with jokes, sketches, comics, and satire pages. This category might also include graphic novel content, which is often associated with comics.
Illegal UKWeb pages that contain child sexual abuse content hosted anywhere in the world, and criminally obscene and incitement to racial hatred content hosted in the UK.
Incidental Nudity Web pages thatat contain non-pornographic images of the bare human body like those in classic sculpture and paintings, or medical images.This category enables you to allow or block sites in order to address cultural or geographic differences in opinion about nudity. For example, you can use this category to block access to nudity, but allow access when nudity is not the primary focus of a site, such as news sites or major portals.
Information SecurityWeb pages that legitimately provide information about data protection. This category includes detailed information for safeguarding business or personal data, intellectual property, privacy, and infrastructure on the Internet, private networks, or in other bandwidth services such as telecommunications.This category does not include:Legitimate information security companies and security software providers, such as virus protection companies.Sites that intend to exploit security or teach how to bypass security.
Information Security NewWeb pages that legitimately provide information about data protection. This category includes detailed information for safeguarding business or personal data, intellectual property, privacy, and infrastructure on the Internet, private networks, or in other bandwidth services such as telecommunications.This category does not include:Legitimate information security companies and security software providers, such as virus protection companies.Sites that intend to exploit security or teach how to bypass security.
Instant MessagingWeb pages that provide software for real-time communication over a network exclusively for users who joined a member's contact list or an instant-messaging session.Most instant-messaging software includes features such as file transfer, PC-to-PC phone calls, and can track when other people log on and off.
Interactive Web ApplicationsWeb pages that provide access to live or interactive web applications, such as browser-based office suites and groupware. This category includes sites with business, academic, or individual focus.This category does not include sites providing access to interactive web applications that do not take critical user data or offer security risks, such as Google Maps.
Internet Radio TV Web pages thatat provide software or access to continuous audio or video broadcasting, such as Internet radio, TV programming, or podcasting.Quick downloads and shorter streams that consume less bandwidth are in the Streaming Media or Media Downloads categories.
Internet ServicesWeb pages that provide services for publication and maintenance of Internet sites such as web design, domain registration, Internet Service Providers, and broadband and telecommunications companies that provide web services.This category includes web utilities such as statistics and access logs, and web graphics like clip art.
Job SearchWeb pages related to a job search including sites concerned with resume writing, interviewing, changing careers, classified advertising, and large job databases. This category also includes corporate web pages that list job openings, salary comparison sites, temporary employment, and company job-posting sites.This category does not include make-money-at-home sites.
Major Global ReligionsWeb pages with content about religious topics and information related to major religions. This category includes sites that cover religious content such as discussion, beliefs, non-controversial commentary, articles, and information for local congregations such as a church or synagogue homepage.The religions in this category are Baha'i, Buddhism, Chinese Traditional, Christianity, Hinduism, Islam, Jainism, Judaism, Shinto, Sikhism, Tenrikyo, Zoroastrianism.
Marketing MerchandisingWeb pages that promote individual or business products or services on the web, but do not sell their products or services online.This category includes websites that are generally a company overview, describing services or products that cannot be purchased directly from these sites. Examples include automobile manufacturer sites, wedding photography services, or graphic design services.This category does not include:Other categories that imply marketing such as Alcohol, Auctions/Classifieds, Drugs, Finance/Banking, Mobile Phone, Online Shopping, Real Estate, School Cheating Information, Software/Hardware, Stock Trading, Tobacco, Travel, and Weapons.Sites that market their services only to other businesses. See the Business category.Sites that rob or cheat consumers. See the Consumer Protection category.
Media DownloadsWeb pages that provide audio or video files for download such as MP3, WAV, AVI, and MPEG formats. The files are saved to, and played from, the user's computer. This category does not include audio or video files that are played directly through a browser window. See the Streaming Media category.
Media SharingWeb pages that allow users to upload, search for, and share media files and photographs, such as online photograph albums.
Messaging Examples include text messaging to mobile phones, PDAs, fax machines, and internal website user-to-user messaging or site-to-site messaging.This category does not include real-time chat or instant messaging, or message posts that can be viewed by anyone but the intended recipient.
Mobile PhoneWeb pages that sell media, software, or utilities for mobile phones that can be downloaded and delivered to mobile phones.Examples include ringtones, logos/skins, games, screen-savers, text-based tunes, and software for SMS, MMS, WAP, and other mobile phone protocols.
ModeratedBulletin boards, chat rooms, search engines, or web mail sites that are monitored by an individual or group who has the authority to block messages or content considered inappropriate.This category does not include sites with posted rules against offensive content. See the Forum/Bulletin Boards category.
Motor VehiclesWebsites for manufacturers and dealerships of consumer transportation vehicles, such as cars, vans, trucks, SUVs, motorcycles, and scooters. This category also includes sites that provide product marketing, reviews, comparisons, pricing information, auto fairs, auto expos, and general consumer information about motor vehicles.This category does not include automotive accessories, mechanics, auto-body shops, and recreational hobby pages. This category does not include sites that provide business-to-business-only content regarding motor vehicles.
Non Profit Advocacy NGOWeb pages from charitable or educational groups that fulfill a stated mission, benefiting the larger community, such as clubs, lobbies, communities, non-profit organizations, labor unions, and advocacy groups.Examples are Masons, Elks, Boy and Girl Scouts, or Big Brothers.
NudityWeb pages that have non-pornographic images of the bare human body. This category includes classic sculpture and paintings, artistic nude photographs, some naturism pictures, and detailed medical illustrations.This category does not include high-profile sites where nudity is not a concern for visitors. See the Incidental Nudity category.
Online Shopping Web pages that sell products or services online.
Web pages selling a broad range of products might pose a risk to users by offering access to items that are normally in other categories such as Pornography, Weapons, Nudity, or Violence. Web pages selling such content exclusively are in their respective categories.
P2P File SharingWeb pages that allow the exchange of files between computers and users for business or personal use, such as downloadable music.P2P clients allow users to search for and exchange files from a peer-user network. They often include spyware or real-time chat capabilities. This category includes BitTorrent web pages.
Parked DomainWeb pages that once served content, but their domains have been sold or abandoned and are no longer registered.Parked domains do not host their own content, but usually redirect users to a generic page that states the domain name is for sale, or redirect users to a generic search engine and portal page, some of which provide valid search engine results.
Personal Network StorageWeb pages that allow users to upload folders and files to an online network server in order to backup, share, edit, or retrieve files or folders from any web browser.
Personal PagesPersonal home pages that share a common domain such as those hosted by ISPs, university/education servers, or free web page hosts.This category also includes unique domains that contain personal information, such as a personal home page. This category does not include home pages of public figures.
PharmacyWeb pages that provide reviews, descriptions, and market or sell prescription-based drugs, over-the-counter drugs, birth control, or dietary supplements.
Politics OpinionWeb pages covering political parties, individuals in political life, and opinion on various topics.This category might also cover laws and political opinion about drugs. This category includes URLs for political parties, political campaigning, and opinions on various topics, including political debates.
PornographyWeb pages that contain materials intended to be sexually arousing or erotic.This category includes fetish pages, animation, cartoons, stories, and illegal pornography.
Portal Sites Web pages that serve as major gateways or directories to content on the web.Many portal sites also provide a variety of internal site features or services such as search engines, email, news, and entertainment. Mailing list sites with a variety of content are in this category.This category does not include sites with topic-specific content.
Potential Criminal ActivitiesWeb pages that provide instructions to commit illegal or criminal activities.Instructions include committing murder or suicide, sabotage, bomb-making, lock-picking, service theft, evading law enforcement, or spoofing drug tests. This category might also include information on how to distribute illegal content, perpetrate fraud, or consumer scams.This category does not include computer-related fraud.
Potential Hacking Computer CrimeWeb pages that provide instructions, or otherwise enable, fraud, crime, or malicious activity that is computer-oriented.This category includes web pages related to computer crime include malicious hacking information or tools that help individuals gain unauthorized access to computers and networks (root kits, kiddy scripts). This category also includes other areas of electronic fraud such as dialer scams and illegal manipulation of electronic devices.This category does not include illegal software.
Potential Illegal SoftwareWeb pages, which the filter believes offer information to potentially 'pirated' or illegally distribute software or electronic media, such as copyrighted music or film, distribution of illegal license key generators, software cracks, and serial numbers.This category does not include peer-to-peer web pages.
Private IP AddressesSites that are private IP addresses as defined in RFC 1918, that is, hosts that do not require access to hosts in other enterprises (or require just limited access) and whose IP address may be ambiguous between enterprises but are well defined within a certain enterprise.
ProfanityWeb pages that contain crude, vulgar, or obscene language or gestures.
Professional NetworkingWeb pages that provide social networking exclusively for professional or business purposes.This category includes sites that provide personal or group profiles, and enable their members to interact through real-time communication, message posting, public bulletins, and media sharing. This category also contains alumni sites that have a networking function.This category does not include social networking sites where the focus might vary, but include friendship, dating, or professional focuses.
Provocative AttireWeb pages with pictures that include alluring or revealing attire, lingerie and swimsuits, or supermodel or celebrity photograph collections, but do not involve nudity.This category does not include sites with swimwear or similar attire that is not intended to be provocative. For example, Olympic swimming sites are not in this category.
Public Information Web pagesthat provide general reference information such as public service providers, regional information, transportation schedules, maps, or weather reports.
PUPs Web pages that contain PPotentially Unwanted Programs (PUPs).PUPs are often made for a beneficial purpose but they alter the security of a computer or the computer user's privacy. Computer users who are concerned about security or privacy might want to be informed about this software, and in some cases, they might want to remove this software from their computers.
Real EstateWeb pages that provide commercial or residential real estate services and information. Service and information includes sales and rental of living space or retail space and guides for apartments, housing, and property, and information on appraisal and brokerage. This category includes sites that allow you to browse model homes. This category does not include content related to personal finance, such as credit applications.
Recreation HobbiesWeb pages for recreational organizations and facilities that include content devoted to recreational activities and hobbies. This category includes information about public swimming pools, zoos, fairs, festivals, amusement parks, recreation guides, hiking, fishing, bird watching, or stamp collecting. This category does not include activities that need no active participation, such as watching a movie or reading celebrity gossip.
Religion IdeologyWeb pages with content related to religious topics and beliefs in human spirituality that are not within the major religions. This category includes religious discussion, beliefs, articles, and information for local congregations or groups such as a church homepage, unless the site is already in the Major Global Religions category. This category also includes comparative religion, or sites that include religions and ideologies. This category does not include astrology and horoscope sites
Remote AccessWeb pages that provide remote access to a program, online service, or an entire computer system. Although remote access is often used legitimately to run a computer from a remote location, it creates a security risk, such as backdoor access. Backdoor access, written by the original programmer, allows the system to be controlled by another party without the user's knowledge.
Reserved This category is reserved for future use.
Residential IP AddressesIP addresses (and any domains associated with them) that access the Internet by DSL modems or cable modems. Because this content is not generally intended for Internet access via HTTP, access to the Internet through these IP addresses can indicate suspicious behavior. This behavior might be related to malware located on the home computer or homegrown gateways set up to allow anonymous Internet access.
Resource Sharing Web pages that harness idle or unused computer resources to focus on a common task. The task can be on a company or an international basis. Well known examples are the SETI program and the Human Genome Project, which use the idle time of thousands of volunteered computers to analyze data.
RestaurantsWeb pages that provide information about restaurants, bars, catering, take-out and delivery, including online ordering. This category includes sites that provide information about location, hours, prices, menus and related dietary information. This category also includes restaurant guides and reviews, and cafes and coffee shops. This category does not include groceries, wholesale food, non-profit and charitable food organizations, or bars that do not focus on serving food.
School Cheating InformationWeb pages that promote plagiarism or cheating by providing free or fee-based term papers, written essays, or exam answers. This category does not include sites that offer student help, discuss literature, films, or books, or other content that is often the subject of research papers.
Search EnginesWeb pages that provide search results that enable users to find information on the Internet based on key words.This category does not include site-specific search engines.
Sexual MaterialsWeb pages that describe or depict sexual acts, but are not intended to be arousing or erotic.Examples of sexual materials include sex education, sexual innuendo, humor, or sex related merchandise.This category does not include web pages with content intended to arouse.
Shareware Freeware Web pages that are repositories of downloadable copies of shareware and freeware.This category does not include subscription-based software.
Social NetworkingWeb pages that enable social networking for a variety of purposes, such as friendship, dating, professional, or topics of interest.These sites provide personal or group profiles and enable interaction among their members through real-time communication, message posting, public bulletins, and media sharing.This category does not include sites that are exclusive to dating, matchmaking, or a specific professional networking focus.
Software HardwareWeb pages related to computing software and hardware, including vendors, product marketing and reviews, deployment and maintenance of software and hardware, and software updates and add-ons such as scripts, plug-ins, or drivers. Hardware includes computer parts, accessories, and electronic equipment used with computers and networks.This category includes the marketing of software and hardware, and magazines focused on software or hardware product reviews or industry trends.
Sports Web pages related to professional or organized recreational sports.This category includes sporting news, events, and information such as playing tips, strategies, game scores, or player trades.This category does not include fantasy leagues, sports centers, athletic clubs, fitness or martial arts clubs, and non-league billiards, darts, or other such activities.
Stock TradingWeb pages that offer purchasing, selling, or trading of shares online.This category also includes ticker-tape information that enables viewing of real-time stock prices and financial spread betting in the stock market. Other betting is in the Gambling category.This category does not include sites that offer information about stocks, but do not offer purchasing, selling, or trading of shares.
Streaming MediaWeb pages that provide streaming media, or contain software plug-ins for displaying audio and visual data before the entire file has been transmitted.This category does not include audio or video files that are downloaded to a user's computer before being played.
Technical Business ForumsWeb pages with a technical or business focus that provide online message posting or real-time chatting, such as technical support or interactive business communication.Although users can post any type of content, these forums tend to present less risk of containing offensive content.Sites that offer a variety of forums with themes, including technical and business content, are only in the categories of Forum/Bulletin Boards or Chat.
Technical InformationWeb pages that provide computing information with an educational focus in areas such as Information Technology, computer programming, and certification. Examples include Linux user groups, UNIX commands, software tutorials, or dictionaries of technical terms. Most sites in this category might be subdirectories of larger domains. For example, a software site with a tutorial page is in this category only at the tutorial page URL. This category does not include content about information security.
Text Spoken Only Content that is text or audio only, and does not contain pictures. This category can be used as an exception to allow explicit text and recorded material to be accessed when you want pictures blocked using the Pornography, Violence, or Sexual Materials categories. Libraries or universities can use this category to prevent the display of offensive graphics in their public facilities.
Text TranslatorsWeb pages that allow users to type phrases or a block of text to translate it from one language into another. This category also includes language identifier web pages. URL translation is in the Anonymizing Utilities category.
Tobacco Web pages that sell, promote, or advocate the use of tobacco products, tobacco paraphernalia, including cigarettes, cigars, pipes, snuff and chewing tobacco.
TravelWeb pages that promote personal or business travel, such as hotels, resorts, airlines, ground transportation, car rentals, travel agencies, and general tourist and travel information. This category also includes sites for buying tickets or accommodation. This category does not include personal vacation photographs.
Usenet NewsWeb pages that provide access (http://) to Usenet newsgroups and archives of files uploaded to newsgroups. This category also includes online groups that offer similar community-oriented content posting.
ViolenceWeb pages that contain real or lifelike images or text that portray, describe, or advocate physical assaults against people, animals, or institutions, such as depictions of war, suicide, mutilation, or dismemberment.
Visual Search EngineWeb pages that provide image-specific search results such as thumbnail pictures. This category does not include sites that offer site-specific visual search engines.
WeaponsWeb pages that provide information about buying, making, modifying, or using weapons, such as guns, knives, swords, paintball guns, and ammunition, explosives, and weapon accessories. This category also includes sites that contain content for: weapons for personal or military use, homemade weapons, non-lethal weapons such as mace, pepper spray, or Taser guns, weapons facilities, such as shooting ranges, and government or military oriented weapons. This category does not include political action groups, such as the NRA.
Web AdsWeb pages that provide advertisement-hosting or programs that create advertisements. Examples include links, source code or applets for banners, popups, and other kinds of static or dynamically generated advertisements that appear on web pages. This category is intended to block advertisements on web pages, not the companies that provide the advertisements or advertising services. This category does not include aggressive advertising adware. See the Spyware/Adware category.
Web MailWeb pages that enable users to send or receive email through the Internet.
Web Meetings Web pages thathost live meetings, video conferences, and interactive presentations mainly for businesses.
Web meetings generally include streaming audio and video, and allow data transfer or office-oriented application sharing, such as online presentations.
Web PhoneWeb pages that enable users to make telephone calls via the Internet or obtain information or software for this purpose.
Web Phone service is also called Internet Telephony, or VoIP. Web phone service includes PC-to-PC, PC-to-phone, and phone-to-phone services connecting via TCP/IP networks.

32.2.3 Content Filter Add Filter Profile Custom Service

Click Configuration > Security Service > Content Filter > Filter Profile > Add or Edit > Custom Service to open the Custom Service screen. You can create a list of good (allowed) web site addresses and a list of bad (blocked) web site addresses. You can also block web sites based on whether the web site's address contains a keyword. Use this screen to add or remove specific sites or keywords from the filter list. Figure 404 Configuration > Security Service > Content Filter > Filter Profile > Custom Service ![](images/56e1a004ab7c41d99b08f9ea0420e2e65ff7ddfadfa38b4b837bcd7ac2f96f18.jpg) The following table describes the labels in this screen. Table 248 Configuration > Security Service > Content Filter > Profile > Custom Service
LABEL DESCRIPTION
Name Enter a descriptive name for this content filtering profile name. You may use 1-31 alphanumeric characters, underscores(_, or dashes (-), but the first character cannot be a number. This value is case-sensitive.
DescriptionEnter a description for the content filtering profile rule to help identify the purpose of rule. You may use 1-31 alphanumeric characters, underscores(_, or dashes (-), but the first character cannot be a number. This value is case-sensitive.This field is optional.
Enable Custom ServiceSelect this check box to allow trusted web sites and block forbidden web sites. Content filter list customization may be enabled and disabled without re-entering these site names.
Allow Web traffic for trusted web sites onlyWhen this box is selected, the Zyxel Device blocks Web access to sites that are not on the Trusted Web Sites list. If they are chosen carefully, this is the most effective way to block objectionable material.
Check Common Trusted/ Forbidden ListSelect this check box to check the common trusted and forbidden web sites lists. See Section 32.3 on page 616 and Section 32.4 on page 617 for information on configuring these lists.
Restricted Web FeaturesSelect the check box(es) to restrict a feature. Select the check box(es) to restrict a feature.When you download a page containing ActiveX or Java, that part of the web page will be blocked with an X.When you download a page coming from a Web Proxy, the whole web page will be blocked.When you download a page containing cookies, the cookies will be removed, but the page will not be blocked.
Block ActiveXActiveX is a tool for building dynamic and active web pages and distributed object applications. When you visit an ActiveX web site, ActiveX controls are downloaded to your browser, where they remain in case you visit the site again.
Java Java is a programming language and development environment for building downloadable Web components or internet and intranet business applications of all kinds.
CookiesCookies are files stored on a computer's hard drive. Some web servers use them to track usage and provide service based on ID.
Web ProxyA server that acts as an intermediary between a user and the Internet to provide security, administrative control, and caching service. When a proxy server is located on the WAN it is possible for LAN users to circumvent content filtering by pointing to this proxy server.
Allow Java/ActiveX/Cookies/Web proxy to trusted web sitesWhen this box is selected, the Zyxel Device will permit Java, ActiveX and Cookies from sites on the Trusted Web Sites list to the LAN. In certain cases, it may be desirable to allow Java, ActiveX or Cookies from sites that are known and trusted.
Trusted Web SitesThese are sites that you want to allow access to, regardless of their content rating, can be allowed by adding them to this list.
Add Click this to create a new entry.
EditSelect an entry and click this to be able to modify it.
Remove Select an entry and click this to delete it.
# This displays the index number of the trusted web sites.
Trusted Web SiteThis column displays the trusted web sites already added.Enter host names such as www.good-site.com into this text field. Do not enter the complete URL of the site – that is, do not include "http://". All subdomains are allowed. For example, entering "*zyxel.com" also allows "www.zyxel.com", "partner.zyxel.com", "press.zyxel.com", and so on. You can also enter just a top level domain. For example, enter "*.com" to allow all .com domains.Use up to 127 characters (0-9a-z-). The casing does not matter. "*" can be used as a wildcard to match any string. The entry must contain at least one "." or it will be invalid.
Add Click this to create a new entry.
EditSelect an entry and click this to be able to modify it.
Remove Select an entry and clickthis to delete it.
# This displays the index number ofthe forbidden web sites.
Forbidden Web Sites This list displays the forbidden web sites already added.Enter host names such as www.bad-site.com into this text field. Do not enter the complete URL of the site – that is, do not include "http://". All subdomains are also blocked. For example, entering "*bad-site.com" also blocks "www.bad-site.com", "partner.bad-site.com", "press.bad-site.com", and do on. You can also enter just a top level domain. For example, enter "*.com" to block all .com domains.Use up to 127 characters (0-9a-z-). The casing does not matter. "*" can be used as a wildcard to match any string. The entry must contain at least one "." or it will be invalid.
Blocked URL KeywordsThis section allows you to block Web sites with URLs that contain certain keywords in the domain name or IP address.
Add Click this to create a new entry.
EditSelect an entry and click this to be able to modify it.
Remove Select an entry and clickthis to delete it.
# This displays the index number ofof the blocked URL keywords.
Blocked URL Keywords This list displays the keywords already added.Enter a keyword or a numerical IP address to block. You can also enter a numerical IP address.Use up to 127 case-insensitive characters (0-9a-zA-Z:/?:@&=+$\._|~*(%)%. "*" can be used as a wildcard to match any string. Use " | *" to indicate a single wildcard character.For example enter *Bad_Site* to block access to any web page that includes the exact phrase Bad_Site. This does not block access to web pages that only include part of the phrase (such as Bad for example).
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving your changes.

32.3 Content Filter Trusted Web Sites Screen

Click Configuration > Security Service > Content Filter > Trusted Web Sites to open the Trusted Web Sites screen. You can create a common list of good (allowed) web site addresses. When you configure Filter Profiles, you can select the option to check the Common Trusted Web Sites list. Use this screen to add or remove specific sites from the filter list. Figure 405 Configuration > Security Service > Content Filter > Trusted Web Sites ![](images/6e57b83dfb8f81ecd1027efe4c027e21a321864189d223bd8d7ab27d5f0196fd.jpg) The following table describes the labels in this screen. Table 249 Configuration > Security Service > Content Filter > Trusted Web Sites
LABEL DESCRIPTION
Common Trusted Web SitesThese are sites that you want to allow access to, regardless of their content rating, can be allowed by adding them to this list.
Add Click this to create a new entry.
EditSelect an entry and click this to be able to modify it.
Remove Select an entry and clickthis to delete it.
# This displays the index number of the trusted web sites.
Trusted Web SiteThis column displays the trusted web sites already added.Enter host names such as www.good-site.com into this text field. Do not enter the complete URL of the site – that is, do not include "http://". All subdomains are allowed. For example, entering "zyxel.com" also allows "www.zyxel.com", "partner.zyxel.com", "press.zyxel.com", and so on. You can also enter just a top level domain. For example, enter .com to allow all .com domains.Use up to 127 characters (0-9a-z-). The casing does not matter.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

32.4 Content Filter Forbidden Web Sites Screen

Click Configuration > Security Service > Content Filter > Forbidden Web Sites to open the Forbidden Web Sites screen. You can create a common list of bad (blocked) web site addresses. When you configure Filter Profiles, you can select the option to check the Common Forbidden Web Sites list. Use this screen to add or remove specific sites from the filter list. Figure 406 Configuration > Security Service > Content Filter > Forbidden Web Sites ![](images/b7bc34043810e3de802bd85a041a6e41e9c08fe199f695f314bd7bf095848af2.jpg) The following table describes the labels in this screen. Table 250 Configuration > Security Service > Content Filter > Forbidden Web Sites
LABEL DESCRIPTION
Forbidden Web Site ListSites that you want to block access to, regardless of their content rating, can be allowed by adding them to this list.
Add Click this to create a new entry.
EditSelect an entry and click this to be able to modify it.
Remove Select an entry and clickthis to delete it.
# This displays the index number of the forbidden web sites.
Forbidden Web Sites This list displays the forbidden web sites already added.Enter host names such as www.bad-site.com into this text field. Do not enter the complete URL of the site – that is, do not include "http://". All subdomains are also blocked. For example, entering "bad-site.com" also blocks "www.bad-site.com", "partner.bad-site.com", "press.bad-site.com", and do on. You can also enter just a top level domain. For example, enter .com to block all .com domains.Use up to 127 characters (0-9a-z-). The casing does not matter.
ApplyClick Apply to save your changes back to the Zyxel Device.
CancelClick Reset to return the screen to its last-saved settings.

32.5 Content Filter Technical Reference

This section provides content filtering background information.

External Content Filter Server Lookup Procedure

The content filter lookup process is described below. Figure 407 Content Filter Lookup Procedure ![](images/65974f77f111a89f0292bbf56823e1365c8ad790f39348d0369faf16503646d6.jpg)
flowchart
graph LR
    A["Computer"] -->|1| B["Red Block"]
    B -->|2| C["..."]
    C -->|3| D["Server 1"]
    C -->|4| E["Server 2"]
1 A computer behind the Zyxel Device tries to access a web site. 2 The Zyxel Device looks up the web site in its cache. If an attempt to access the web site was made in the past, a record of that web site's category will be in the Zyxel Device's cache. The Zyxel Device blocks, blocks and logs or just logs the request based on your configuration. 3 Use the Content Filter Cache screen to configure how long a web site address remains in the cache as well as view those web site addresses. All of the web site address records are also cleared from the local cache when the Zyxel Device restarts. 4 If the Zyxel Device has no record of the web site, it queries the external content filter database and simultaneously sends the request to the web server. 5 The external content filter server sends the category information back to the Zyxel Device, which then blocks and/or logs access to the web site based on the settings in the content filter profile. The web site's address and category are then stored in the Zyxel Device's content filter cache.

CHAPTER 33

Anti-Malware

33.1 Overview

Use the Zyxel Device's anti-malware feature to protect your connected network from malware (malicious software) infection, such as computer virus, worms, and spyware. The Zyxel Device scans traffic going in both directions for malware signature matches. In the following figure, the Zyxel Device scans traffic coming from the WAN zone (which includes two interfaces) to the LAN zone. Figure 408 Zyxel Device Anti-Malware Example ![](images/224ef3d41502b234c97494c72614984df69c7a892372e75bba06ef9ee4d0a8b4.jpg)
flowchart
graph TD
    A["DMZ"] --> B["LAN"]
    B --> C["WAN1"]
    B --> D["WAN2"]
    C --> E["Internet"]
    D --> F["Internet"]
    style A fill:#cce5ff,stroke:#333
    style B fill:#cce5ff,stroke:#333
    style C fill:#ffcccc,stroke:#333
    style D fill:#ffcccc,stroke:#333
    style E fill:#cce5ff,stroke:#333
    style F fill:#cce5ff,stroke:#333
The anti-malware matches a file with those in a malware database. This is done as files go through the Zyxel Device.

Virus, Worm, and Spyware

A computer virus is a type of malicious software designed to corrupt and/or alter the operation of other legitimate programs. A worm is a self-replicating virus that resides in active memory and duplicates itself. The effect of a virus attack varies from doing so little damage that you are unaware your computer is infected to wiping out the entire contents of a hard drive to rendering your computer inoperable. Spyware infiltrate your device and secretly gathers information about you, such as your network activity, passwords, bank details, and so on.

Hash Value

A hash function is an algorithm that maps data of arbitrary size to data of fixed size. The value returned by a hash function is a hash value. Hash values can be used to identify if the contents of a file have changed. At the time of writing, the MD5 (Message Digest 5) hash algorithm is supported.

Local Signature Databases

The Zyxel Device downloads the signature(s) after it is registered and the anti-malware license is activated at myZyxel. A signature is a unique string of bits, or binary pattern, of a malware. A signature acts as a fingerprint that can be used to detect and identify specific malware. The Zyxel Device downloads the following signatures: • Anti-malware signature These signatures are periodically updated if you have a valid license. See Section 33.2 on page 625 for how the Zyxel Device updates these signatures for the anti-malware license.

Cloud Query

Another method of malware protection is through cloud query. This process is illustrated in the next figure. With Cloud Query, the Zyxel Device queries the Defend Center database by sending the file's hash value (A) and receiving the scan results (B) through the Defend Center (DC). Figure 409 Cloud Query ![](images/5328898d673e1014515766aca17bbf2d4828952a06ad63a1727ff4ac2d04c435.jpg)
flowchart
graph LR
    A["ZYKEL"] -->|A| B["DC Database"]
    B -->|B| A
Anti-Malware Licensing Having extensive, up-to-date signatures with the most common malware is critical to making the anti-malware service work effectively. Section 7.2 on page 199 shows licensing information for the different signature databases that can be used by the Zyxel Device. After the anti-malware license expires, you need to purchase an iCard to update your local signature database and use cloud query. Extend your license in the Registration > Service screen.

Anti-Malware Scan Process

Before going through the Anti-Malware scan, the Zyxel Device first identifies the packets sent by the following four major protocols with corresponding standard ports: - FTP (File Transfer Protocol) - HTTP (Hyper Text Transfer Protocol) - SMTP (Simple Mail Transfer Protocol) • POP3 (Post Office Protocol version 3) The Zyxel Device records the order of packets in TCP connection-oriented sessions to check for matching malware signatures. The order of non-setup packets such as SYN, ACK and FIN is ignored.

Anti-Malware Scanning Procedure:

1 The Zyxel Device checks every packet of the file for matches with the local signature databases. If a malware pattern signature is matched, the actions you specify for identified malware will be applied. If Destroy infected file is enabled, the file will be modified. Logs/alerts will be sent according to your settings. Note: The receiver is not notified if a file is modified by the Zyxel Device. If the file cannot be used, the receiver should contact the Zyxel Device administrator to confirm if the Zyxel Device modified the file by checking the logs. 2 If no match is found with the local databases, the Zyxel Device uses Cloud Query to forward the file's hash value to Defend Center. 3 Defend Center checks its database for malware signature matches and sends the results back to the Zyxel Device. If a malware signature is matched, the actions you specify for identified malware will be applied. If Destroy infected file is enabled, the file will be modified. Logs/alerts will be sent according to your settings. The next figure shows a flow chart detailing the anti-malware scan. Figure 410 Anti-Malware Flowchart ![](images/aa02b932260d888a2531c9db8b418dbd13817c1162265ddb52d8e5d0d26b7af3.jpg)
flowchart
graph TD
    A["Start"] --> B["Check for malware patterns"]
    B --> C{Match?}
    C -->|Y| D["Modify the file*"]
    C -->|N| E["Check for malware hash values"]
    E --> F{Match?}
    F -->|Y| G["Modify the file*"]
    F -->|N| H["Cloud Query"]
    G --> I["End"]
    H --> I
    I --> J{Match?}
    J -->|Y| K["Modify the file*"]
    J -->|N| L["*Destroy infected file must be enabled"]

File Scanning Cloud Query Supported File Types

At the time of writing, the following file types are supported: Table 251 File Scanning Cloud Query Supported File Types
• 7z Archive (7z)• AVI Video (avi)• BMP Image (bmp)• BZ2 Archive (bz2)
• Executables (exe) •Macromedia Flash Data (swf)• GIF Image (gif) • GZ Archive (gz)
• JPG Image (jpg)• MOV Video (mov)• MP3 Audio (mp3)• MPG Video (mpg)
• MS Office Document (doc...)• PDF Document (pdf)• P N G I m a g e (png) • RAR Archive (rar)
• RM Video (rm)• RTF Document (rtf)• TIFF Image (tif)• WAV Audio (wav)
• ZIP Archive (zip)

Notes About the Zyxel Device Anti-Malware

The following lists important notes about the Zyxel Device's anti-malware feature: 1 Zyxel's anti-malware feature can detect polymorphic malware (see Section 33.5 on page 631). 2 When malware is detected, a log is created or an alert message is sent to the administrator depending on your log settings. 3 Changes to the Zyxel Device's anti-malware settings only affect new sessions, not sessions that already existed before you applied the changed settings. 4 Enabling Cloud Query may affect file transfer speeds. 5 The Zyxel Device does not scan the following file/traffic types: - Simultaneous downloads of a file using multiple connections. For example, when you use FlashGet to download sections of a file simultaneously. - Encrypted traffic. This could be password-protected files or VPN traffic where the Zyxel Device is not the endpoint (pass-through VPN traffic). - Traffic through custom (non-standard) ports. The Zyxel Device scans whatever port number is specified for FTP in the ALG screen. - All compressed files within a compressed file. Note that a single file can still be decompressed and scanned if you select Enable file decompression (ZIP and RAR). - Traffic compressed or encoded using a method the Zyxel Device does not support.

Finding Out More

• See Section 33.7 on page 638 for anti-malware background information.

33.1.1 What You Can Do in this Chapter

\- Use the Anti-Malware screen (Section 33.2 on page 625) to turn anti-malware on or off, and check the anti-malware signature status. In addition, you can set up anti-malware black (blocked) and white (allowed) lists of malware patterns. - Use the White List screen (Section 33.3 on page 628) to specify the file or encryption pattern to allow in order to avoid false positives. False positives occur when a non-infected file matches a malware signature. - Use the Black List screen (Section 33.4 on page 630) to specify the file or encryption pattern that you want to block. - Use the Signature screen (Section 33.5 on page 631) to search for particular signatures and get more information about them.

33.2 Anti-Malware Screen

Click Configuration > Security Service > Anti-Malware to display the configuration screen as shown next. Click the Anti-Malware icon for more information on the Zyxel Device's security features. See Subscription Services Available on page 196 for more information on the subscription services for the two types of security packs. Note: If Destroy infected file is disabled and log is set to no, the Zyxel Device will still perform the scan but will not do anything else. It is recommended to enable at least one of the two functions. If Destroy infected file is disabled, any malicious file found can still be executed by the end user after it is forwarded. The administrator would have to inform the user if there is an infected file. Figure 411 Configuration > Security Service > Anti-Malware ![](images/b9f8b796edc0ff86b234fd25590abd22267d3635ccc5fd764cbe55193f983acd.jpg) The following table describes the labels in this screen. Table 252 Configuration > Security Service > Anti-Malware
LABEL DESCRIPTION
General Setting
EnableSelect this checkbox to activate the anti-malware feature to protect your connected network from infection and the installation of malicious software.
LABELDESCRIPTION
Scan and detect EICAR test virusSelect this option to have the Zyxel Device check for an EICAR test file and treat it in the same way as a real malware file.The EICAR test file is a standardized test file for signature based anti-malware scanners.When the scanner detects the EICAR file, it responds in the same way as if it found real malware. The EICAR file can also be compressed to test whether the anti-malware software can detect it in a compressed file. The EICAR test string consists of the following human-readable ASCII characters.X5O!P%@AP[4\PZX54(P^)7CC)7]EICAR-STANDARD-ANTIVIRUS-TEST-FILE!H+H*
Scan Mode
Express ModeIn this mode you can define which types of files are scanned using the File Type For Scan fields. The Zyxel Device then scans files by sending each file's hash value to a cloud database using cloud query. This is the fastest scan mode.
Stream ModeIn this mode the Zyxel Device scans all files for viruses using its anti-malware signatures to detect known virus pattens. This is the deepest scan mode.
File Type For Scan
Available File TypesFile types that can be checked by the Zyxel Device are listed here. Note that the files on this list are currently bypassed. To use this feature on a specific file type, click this file type and then click the right arrow button.See available file types in Table 251 on page 624.
Applied File TypesFile types that will be checked are listed here. If you don't want a file type to be checked, click this file type and then click the left arrow button.
Destroy infected fileWhen you select this check box, if a malware signature is matched, the Zyxel Device overwrites the infected portion of the file with zeros before being forwarded to the user. The uninfected portion of the file will pass through unmodified.
Log These are the log options:no: Do not create a log when a packet matches a signature.log: Create a log on the Zyxel Device when a packet matches a signature.log alert: An alert is an emailed log for more serious events that may need more immediate attention. Select this option to have the Zyxel Device send an alert when a packet matches a signature(s).
Check White ListSelect this check box to have the Zyxel Device not perform the anti-malware check on files with names that match the white list patterns.
Add Click this to create a new entry.
Edit Select an entry and click this to be able to modify it.
Remove Select an entry and click this to delete it.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
StatusThe activate (light bulb) icon is lit when the entry is active and dimmed when the entry is inactive.
# This is the entry's index number in the list.
File PatternThis is the file name pattern. If a file's name matches this pattern, the Zyxel Device does not check the file for malware.
Check Black ListSelect this check box to log and delete files with names that match the black list patterns.
Add Click this to create a new entry.
Edit Select an entry and click this to be able to modify it.
Remove Select an entry and click this to delete it.
ActivateLABEL DESCRIPTIONTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
StatusThe activate (light bulb) icon is lit when the entry is active and dimmed when the entry is inactive.
# This is the entry's indexex number in the list.
File PatternThis is the file name pattern. If a file's name that matches this pattern, the Zyxel Device logs and then destroys the file.
File decompression
Enable file decompression (ZIP and RAR)Select this check box to have the Zyxel Device scan a compressed file (the file does not need to have a "zip" or "rar" file extension). The Zyxel Device first decompresses the file and then scans the contents for malware.Note: The Zyxel Device decompresses a compressed file once. The Zyxel Device does NOT decompress any file(s) within a compressed file.
Destroy compressed files that could not be decompressedWhen you select this check box, the Zyxel Device deletes compressed files that use password encryption.Select this check box to have the Zyxel Device delete any compressed files that it cannot decompress. The Zyxel Device cannot decompress password protected files or a file within another compressed file. There are also limits to the number of compressed files that the Zyxel Device can concurrently decompress.Note: The Zyxel Device's firmware package cannot go through the Zyxel Device with this check box enabled. The Zyxel Device classifies the firmware package as a file that cannot be decompressed and then deletes it. Clear this check box when you download a firmware package from the Zyxel website. It's OK to upload a firmware package to the Zyxel Device with the check box selected.
Signature InformationThe following fields display information on the current signature set that the Zyxel Device is using.
Current VersionThis field displays the signature set version number currently used by the Zyxel Device. This number gets larger as the set is enhanced.
Released Date Thisfield displays the date and time the set was released.
Update SignaturesClick this link to go to the screen you can use to download signatures from the update server.
ApplyClick Apply to save your changes.
ResetClick Reset to return the screen to its last-saved settings.

33.3 The White List Screen

A white list allows you to specify the file or encryption pattern to allow in order to avoid false positives. False positives occur when a non-infected file matches a malware signature. Enter a file or encryption pattern that would cause the Zyxel Device to allow this file. Click Configuration > Security Service > Anti-Malware > Black/ White List > White List to display the following screen. Use Add to put a new entry in the list or Edit to change an existing one or Remove to delete an existing entry. Figure 412 Configuration > Security Service > Anti-Malware > Black/White List > White List ![](images/e3aa82ccf14ddba8b4c7bf63b2c1996694aab0e4bff2f6afc769046891b7ae66.jpg) The following table describes the fields in this screen. Table 253 Configuration > Security Service > Anti-Malware > Black/White List > White List
LABEL DESCRIPTION
Check White ListSelect this check box to have the Zyxel Device not perform the anti-malware check on files with names or algorithm (MD5 Hash) that match the white list patterns.
Add Click this to create a new entry.
Edit Select an entry and click this to be able to modify it.
Remove Select an entry and click this to delete it.
ActivateTo turn on an entry, select it and click Activate.
Inactivate To turn off an entry, select it and click Inactivate.
# This is the entry's index number in the list.
StatusThe activate (light bulb) icon is lit when the entry is active and dimmed when the entry is inactive.
TypeThis field displays the type (MD5 Hash or File Pattern) used to distinguish whether a file should be allowed.Select the type (MD5 Hash or File Pattern) that you want to use to distinguish whether a file should be allowed.
ValueThis field displays the file or encryption pattern of the entry.Enter the file or encryption pattern for this entry. Specify a pattern to identify the names of files that the Zyxel Device should not scan for viruses.Use up to 80 characters. Alphanumeric characters, underscores (_), dashes (-). question marks (?) and asterisks (*) are allowed.A question mark (?) lets a single character in the file name vary. For example, use "a?.zip" (without the quotation marks) to specify aa.zip, ab.zip and so on.Wildcards (*) let multiple files match the pattern. For example, use "*a.zip" (without the quotation marks) to specify any file that ends with "a.zip". A file named "testa.zip would match. There could be any number (of any type) of characters in front of the "a.zip" at the end and the file name would still match. A file named "test.zipa" for example would not match.A * in the middle of a pattern has the Zyxel Device check the beginning and end of the file name and ignore the middle. For example, with "abc*.zip", any file starting with "abc" and ending in ".zip" matches, no matter how many characters are in between.The whole file name has to match if you do not use a question mark or asterisk.If you do not use a wildcard, the Zyxel Device checks up to the first 80 characters of a file name.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

33.4 The Black List Screen

A black list allows you to specify the file or encryption pattern that you want to block. Enter a file or encryption pattern that would cause the Zyxel Device to log and then destroy this file. Click Configuration > Security Service > Anti-Malware > Black/ White List > Black List to display the following screen. Use Add to put a new entry in the list or Edit to change an existing one or Remove to delete an existing entry. Figure 413 Configuration > Security Service > Anti-Malware > Black/White List > Black List ![](images/31eb8f94a5fa8132ac1f32d62757b3ec5edb5708cf610b234278001eb8af5bcf.jpg) The following table describes the fields in this screen. Table 254 Configuration > Security Service > Anti-Malware > Black/White List > Black List
LABEL DESCRIPTION
Check Black ListSelect this check box to log and delete files with names or encryption algorithm (MD5 Hash) that match the black list patterns.
Add Click this to create a new entry.
Edit Select an entryand click this to be able to modify it.
Remove Select an entry and click this to delete it.
ActivateTo turn on an entry, select it and click Activate.
Inactivate To turn offan entry, select it and click Inactivate.
# This is the entry's index number in the list.
StatusThe activate (light bulb) icon is lit when the entry is active and dimmed when the entry is inactive.
TypeThis field displays the type (MD5 Hash or File Pattern) used to distinguish whether a file should be blocked.Select the type (MD5 Hash or File Pattern) that you want to use to distinguish whether a file should be blocked.
Table 254 Configuration > Security Service > Anti-Malware > Black/White List > Black List
LABEL DESCRIPTION
ValueThis field displays the file or encryption pattern of the entry. Enter a file pattern that would cause the Zyxel Device to log and modify this file.Use up to 80 characters. Alphanumeric characters, underscores (_), dashes (-), question marks (?) and asterisks (*) are allowed.A question mark (?) lets a single character in the file name vary. For example, use "a? .zip" (without the quotation marks) to specify aa.zip, ab.zip and so on.Wildcards (*) let multiple files match the pattern. For example, use "*a.zip" (without the quotation marks) to specify any file that ends with "a.zip". A file named "testa.zip would match. There could be any number (of any type) of characters in front of the "a.zip" at the end and the file name would still match. A file named "test.zipa" for example would not match.A * in the middle of a pattern has the Zyxel Device check the beginning and end of the file name and ignore the middle. For example, with "abc*.zip", any file starting with "abc" and ending in ".zip" matches, no matter how many characters are in between.The whole file name has to match if you do not use a question mark or asterisk.If you do not use a wildcard, the Zyxel Device checks up to the first 80 characters of a file name.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

33.5 Anti-Malware Signature Searching

Click Configuration > Security Service > Anti-Malware > Signature to display this screen. Use this screen to locate signatures and display details about them. If your web browser opens a warning screen about a script making the web browser run slowly and the computer unresponsive, just click No to continue. Click a column's heading cell to sort the table entries by that column's criteria. Click the heading cell again to reverse the sort order. Figure 414 Configuration > Security Service > Anti-Malware > Signature ![](images/3e6b8ababa21a6ae3b6e3671c2d43f3310c9669217eed324cf67340a1496bedc.jpg) The following table describes the labels in this screen. Table 255 Configuration > Security Service > Anti-Malware > Signature
LABEL DESCRIPTION
Signatures SearchEnter the name, part of the name or keyword of the signature(s) you want to find and click Search. This search is not case-sensitive and accepts numerical strings.
Query Result
# This is the entry's index number in the list.
NameThis is the name of the anti-malware signature. Click the Name column heading to sort your search results in ascending or descending order according to the signature name.Click a signature's name to see details about the malware.

33.6 Anti-Malware Profile

To use multiple profiles for this feature, run the following commands in the Zyxel Device Command Line Interface (CLI).
Router# configure terminal
Router(config)# secure-policy-style advance
Router(config)# show secure-policy-style status
secure-policy-style: advance
After you run these command, go to the feature screen again in the web configurator. You will be prompted to log out and then log in again. Figure 415 Logout Prompt ![](images/bd99ab14de21702172e66b1be235fbb8baaa4bea83aad9486c6a78345a53bd34.jpg) After you log in again, you will see the new profile screen for this feature. Figure 416 Configuration > Security Service > Anti-Malware > Profile ![](images/10ae4de2f5026e08298fe0c3c595a94f114b8131edc43ec4145fdf655ab14d72.jpg) The following table describes the labels in this screen. Table 256 Configuration > Security Service > Anti-Malware > Profile
LABEL DESCRIPTION
AddClick this to create a new entry. Select an entry and click Add to create a new entry after the selected entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveSelect an entry and click Remove to delete the selected entry.
Table 256 Configuration > Security Service > Anti-Malware > Profile
LABEL DESCRIPTION
#This field is a sequential value showing the number of the profile. The profile order is not important.
Name This displaysthe name of the profile created.
Description This displays the description of the profile.

33.6.1 Add or Edit an Anti-Malware Profile

Click Add to create a new entry or select an existing entry and click Edit to open the following screen where you can create or modify the entry's settings. Figure 417 Configuration > Security Service > Anti-Malware > Profile > Add/Edit ![](images/9ad3e7ca6c4cd9296955cc6f69a3cb4218ad339cdeffc551103d99e6a4b3a5b2.jpg) The following table describes the labels in this screen. Table 257 Configuration > Security Service > Anti-Malware > Profile > Add/Edit
LABEL DESCRIPTION
General Setting
NameType the name of the profile. You may use 1-31 alphanumeric characters, underscores( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive. These are valid, unique profile names:My Profilem Y ProfileMymy12_3-4These are invalid profile names:lmYProfileMy ProfileM y Profile?Whatalongprofilename123456789012
DescriptionType a description for the profile rule to help identify the purpose of rule. You may use 1-31 alphanumeric characters, underscores (_), or dashes (-), but the first character cannot be a number. This value is case-sensitive. This field is optional.
Actions When Matched
Destroy infected fileWhen you select this check box, if a malware signature is matched, the Zyxel Device overwrites the infected portion of the file with zeros before being forwarded to the user. The uninfected portion of the file will pass through unmodified.
Log These are the logoptions:no: Do not create a log when a packet matches a signature.log: Create a log on the Zyxel Device when a packet matches a signature.log alert: An alert is an emailed log for more serious events that may need more immediate attention. Select this option to have the Zyxel Device send an alert when a packet matches a signature(s).
Scan Options
Check White ListSelect this check box to have the Zyxel Device not perform the anti-malware check on files with names that match the white list patterns.
Check Black ListSelect this check box to log and delete files with names that match the black list patterns.
File decompression
Enable file decompression (ZIP and RAR)Select this check box to have the Zyxel Device scan a compressed file (the file does not need to have a "zip" or "rar" file extension). The Zyxel Device first decompresses the file and then scans the contents for malware.Note: The Zyxel Device decompresses a compressed file once. The Zyxel Device does NOT decompress any file(s) within a compressed file.
Destroy compressed files that could not be decompressedWhen you select this check box, the Zyxel Device deletes compressed files that use password encryption.Select this check box to have the Zyxel Device delete any compressed files that it cannot decompress. The Zyxel Device cannot decompress password protected files or a file within another compressed file. There are also limits to the number of compressed files that the Zyxel Device can concurrently decompress.Note: The Zyxel Device's firmware package cannot go through the Zyxel Device with this check box enabled. The Zyxel Device classifies the firmware package as a file that cannot be decompressed and then deletes it. Clear this check box when you download a firmware package from the Zyxel website. It's OK to upload a firmware package to the Zyxel Device with the check box selected.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.
To link a profile to a policy, go to the Configuration > Security Policy > Policy Control screen, select a policy, and then click Edit. In the Edit Policy screen under Profile, select which profile you want to use for each security service. Figure 418 Configuration > Security Service > Policy Control > Profile ![](images/94fcbfb0bb80b87af56eef4bb8175cdba2efd215d675384adb9d9ff0cabf4bda.jpg)

33.6.3 Anti-Malware Advance Screen

The Security Service > Anti-Malware > Anti-Malware screen changes when using profiles. Figure 419 Configuration > Security Service > Anti-Malware Advance ![](images/42b0019c56eac781c6e54fc4a266a1eddb3c0768b8c2d356e5a8f70f96bd73a7.jpg) The following table describes the labels in this screen. Table 258 Configuration > Security Service > Anti-Malware Advance
LABEL DESCRIPTION
General Setting
EnableSelect this checkbox to activate the anti-malware feature to protect your connected network from infection and the installation of malicious software.
Inspect all traffic, setting:Select this to have all traffic inspected by thedefault_profile. You cannot rename or delete thedefault_profileprofile, but you can edit it by clicking the link here.
Inspect by policyIf you configured a specific profile in theProfiletab for this service, select this to have specific traffic inspected by that profile. You must bind the profile to a policy inSecurity Policy > Policy Control.
Scan and detect EICAR test virusSelect this option to have the Zyxel Device check for an EICAR test file and treat it in the same way as a real malware file.The EICAR test file is a standardized test file for signature based anti-malware scanners.When the scanner detects the EICAR file, it responds in the same way as if it found real malware. The EICAR file can also be compressed to test whether the anti-malware software can detect it in a compressed file. The EICAR test string consists of the following human-readable ASCII characters.X5O!P%@AP[4\PZX54(P^)7CC]7)EICAR-STANDARD-ANTIVIRUS-TEST-FILE!H+H*
Scan Mode
Express ModeIn this mode you can define which types of files are scanned using the File Type For Scan fields. The Zyxel Device then scans files by sending each file's hash value to a cloud database using cloud query. This is the fastest scan mode.
Stream ModeIn this mode the Zyxel Device scans all files for viruses using its anti-malware signatures to detect known virus pattens. This is the deepest scan mode.
File Type For Scan
Available File TypesFile types that can be checked by the Zyxel Device are listed here. Note that the files on this list are currently bypassed. To use this feature on a specific file type, click this file type and then click the right arrow button.See available file types in Table 251 on page 624.
Applied File TypesFile types that will be checked are listed here. If you don't want a file type to be checked, click this file type and then click the left arrow button.
ApplyClick Apply to save your changes.
ResetClick Reset to return the screen to its last-saved settings.

33.6.4 Remove Profiles

To remove profiles and revert to the default general security policy style, you must first make sure to change Inspect by policy to Inspect all traffic in the following security services: Anti-Malware, DNS Filter, URL Threat Filter, IDP, Email Security. Note: All profiles that you created will be removed from Security Policy > Policy Control. Run the following commands in the Zyxel Device Command Line Interface (CLI).
Router# configure terminal
Router(config)# secure-policy-style general
Router(config)# show secure-policy-style status
secure-policy-style: general 
Wait a minute and then go to the feature screen again in the web configurator. You will be prompted to log out and then log in again. Figure 420 Logout Prompt ![](images/2b76480bcd286f2a75882c31e299db7fb75ae111f40a6a0422e0604ab997a70e.jpg) After you log in again, you will not see the profile screen for this feature.

33.7 Anti-Malware Technical Reference

Types of Malware

The following table describes some of the common malware. Table 259 Common Malware Types
TYPE DESCRIPTION
File InfectorThis is a small program that embeds itself in a legitimate program. A file infector is able to copy and attach itself to other programs that are executed on an infected computer.
Boot Sector VirusThis type of virus infects the area of a hard drive that a computer reads and executes during startup. The virus causes computer crashes and to some extend renders the infected computer inoperable.
Macro VirusMacro viruses or Macros are small programs that are created to perform repetitive actions. Macros run automatically when a file to which they are attached is opened. Macros spread more rapidly than other types of viruses as data files are often shared on a network.
Email Virus Email virusesare malicious programs that spread through email.
Polymorphic VirusA polymorphic virus (also known as a mutation virus) tries to evade detection by changing a portion of its code structure after each execution or self replication. This makes it harder for an anti-malware scanner to detect or intercept it.A polymorphic virus can also belong to any of the virus types discussed above.

Malware Infection and Prevention

The following describes a simple life cycle of malware. 1 A computer gets a copy of malware from a source such as the Internet, email, file sharing or any removable storage media. The malware is harmless until the execution of an infected program. 2 The malware spreads to other files and programs on the computer. 3 The infected files are unintentionally sent to another computer thus starting the spread of the malware. 4 Once the malware is spread through the network, the number of infected networked computers can grow exponentially.

Types of Anti-Malware Scanner

The section describes two types of anti-malware scanner: host-based and network-based. A host-based anti-malware (HAM) scanner is often software installed on computers and/or servers on the network. It inspects files for malware patterns as they are moved in and out of the drive. However, host-based anti-malware scanners cannot eliminate all malware for a number of reasons: - HAM scanners are slow in stopping malware threats through real-time traffic (such as from the Internet). - HAM scanners may reduce computing performance as they also share resources (such as CPU time) on the computer for file inspection. - You have to update the malware signatures and/or perform malware scans on all computers on the network regularly. A network-based anti-malware (NAM) scanner is often deployed as a dedicated security device (such as your Zyxel Device) on the network edge. NAM scanners inspect real-time data traffic (such as email messages or web) that tends to bypass HAM scanners. The following lists some of the benefits of NAM scanners. - NAM scanners stop malware threats at the network edge before they enter or exit a network. - NAM scanners reduce computing loading on computers as the read-time data traffic inspection is done on a dedicated security device.

CHAPTER 34

Reputation Filter

34.1 Overview

Use the Reputation Filter screens to configure settings for URL Threat filtering.

34.1.1 What You Need to Know

URL Threat Filter

URL filtering compares access to specific URLs against a database of blocked or allowed sites. Sites on the database are sorted into categories such as:
• A non y m i zer s • B row s e r E x p l o i t s • Malicious Downloads
• Malicious Sites • Phishing • S p a m U R L s
• Spyware Adware Keyloggers • •

34.1.2 What You Can Do in this Chapter

\- Use the URL Threat Filter screen (Section 34.2 on page 640) to enable URL Threat filtering and specify what action the Zyxel Device takes when any suspicious activity is detected.

34.2 URL Threat Filter Screen

When you enable the URL Threat filtering service, your Zyxel Device will access an external database, Cloud Query, that has millions of web sites categorized based on content. You can have the Zyxel Device allow, block, warn and/or log access to web sites or hosts based on selected categories. The priority for URL Threat checking is as follows: 1 White List 2 Black List 3 Cloud Query Cache 4 Cloud Query Use this screen to enable URL Threat filtering and specify the action the Zyxel Device takes when it detects a suspicious activity or a connection attempt to or from a site in a selected category. Click the URL Threat Filter icon for more information on the Zyxel Device's security features. Click Configuration > Security Service > Reputation Filter > URL Threat Filter to display the configuration screen as shown next. Figure 421 Configuration > Security Service > Reputation Filter > URL Threat Filter > General ![](images/2e2f0333b7ef582f3acc80a323686dcbe8c0f42cb0255dcc24b02f7c5fe6658f.jpg) The following table describes the labels in this screen. Table 260 Configuration > Security Service > Reputation Filter > URL Threat Filter > General
LABEL DESCRIPTION
URL Blocking
EnableSelect this option to turn on URL blocking on the Zyxel Device.
ActionSet what action the Zyxel Device takes when it detects a connection attempt to or from the web pages of the specified categories.block: Select this action to have the Zyxel Device block access to the web pages that match the categories that you select above.warn: Select this action to have the Zyxel Device display a warning message to the access requesters for the web pages before allowing users to access web pages that match the categories that you select above.pass: Select this action to have the Zyxel Device allow access to the web pages that match the categories that you select above.
Log These are the logoptions:no: Do not create a log when it detects a connection attempt to or from the web pages of the specified categories.log: Create a log on the Zyxel Device when it detects a connection attempt to or from the web pages of the specified categories.log alert: An alert is an emailed log for more serious events that may need more immediate attention. Select this option to have the Zyxel Device send an alert when a connection matches web pages of the specified categories.
Message to display when a site is blocked
Denied Access MessageEnter a message to be displayed when the URL Threat filter blocks access to a web page. Use up to 127 characters (0-9a-zA-Z;/?:@&+\._!~*')(%,"). For example, "Access to this web page is not allowed. Please contact the network administrator".It is also possible to leave this field blank if you have a URL specified in the Redirect URL field. In this case if the URL Threat filter blocks access to a web page, the Zyxel Device just opens the web page you specified without showing a denied access message.
Redirect URLEnter the URL of the web page to which you want to send users when their web access is blocked by the URL Threat filter. The web page you specify here opens in a new frame below the denied access message.Use "http://" or "https://" followed by up to 262 characters (0-9a-zA-Z;/?:@&+\._!~*')%). For example, http://192.168.1.17/blocked access.
Security Threat CategoriesSelect the categories of web pages that may pose a security threat to network devices behind the Zyxel Device.
AnonymizersSites and proxies that act as an intermediary for surfing to other Web sites in an anonymous fashion, whether to circumvent Web filtering or for other reasons.
Browser ExploitsSites that contain browser exploits. A browser exploit is any content that forces a web browser to perform operations that you do not explicitly intend.
Malicious DownloadsSites that have been identified as containing malicious downloads or malware harmful to a user's computer.
Malicious SitesSites that install unwanted software on a user's computer with the intent to enable third-party monitoring or make system changes without the user's consent.
PhishingSites that are used for deceptive or fraudulent purposes, such as stealing financial or other user account information. These sites are most often designed to appear as legitimate sites in order to mislead users into entering their credentials.
Spam URLs Sites that have been promoted through spam techniques.
Spyware Adware KeyloggersSites that contain spyware, adware or keyloggers.Spyware is a program installed on your computer, usually without your explicit knowledge, that captures and transmits personal information or Internet browsing habits and details to companies. Companies use this information to analyze browsing habits, to gather marketing data, and to sell your information to others.Key logger programs try to capture and steal your passwords and watch and record everything you do on your computer.Adware programs typically display blinking advertisements or pop-up windows when you perform a certain action. Adware programs are often installed in exchange for another service, such as the right to use a program without paying for it.
Test URL Threat Category
URL to testEnter a URL using http://domain or https://domain and click the Query button to check if the domain belongs to a URL threat category.
ApplyClick Apply to save your changes.
ResetClick Reset to return the screen to its last-saved settings.

34.2.1 URL Threat Filter White List Screen

Use this screen to create white list entries. The Zyxel Device will allow incoming packets from the listed IPv4 addresses and URLs. Figure 422 Configuration > Security Service > Reputation Filter > URL Threat Filter > White List ![](images/6518d7c67bedc5b1faf1ca488de4386187442c1fac3719861020b0d07098b08c.jpg) The following table describes the labels in this screen. Table 261 Configuration > Security Service > Reputation Filter > URL Threat Filter > White List
LABEL DESCRIPTION
White List
Add Click this to createa new entry.
Edit Select an entry andclick this to be able to modify it.
Remove Select an entryand click this to delete it.
# This is the entry's indexnumber in the list.
White List This field displays the URL of this entry.
ApplyClickApplyto save your changes back to the Zyxel Device.
ResetClickResetto return the screen to its last-saved settings.

34.2.2 URL Threat Filter Black List Screen

Use this screen to create black list entries. The Zyxel Device will block incoming packets from the listed IPv4 addresses and URLs. Figure 423 Configuration > Security Service > Reputation Filter > URL Threat Filter > Black List ![](images/5e2d65e212c939fc626ff8463fd079da406b07735dea6b8e0a79eceafe5ed02f.jpg) The following table describes the labels in this screen. Table 262 Configuration > Security Service > Reputation Filter > URL Threat Filter > Black List
LABEL DESCRIPTION
Black List
Add Click this to createa new entry.
Edit Select an entry andclick this to be able to modify it.
Remove Select an entryand click this to delete it.
# This is the entry's indexnumber in the list.
Black List This field displays the URL of this entry.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

34.3 URL Threat Filter Profile

To use multiple profiles for this feature, run the following commands in the Zyxel Device Command Line Interface (CLI).
Router# configure terminal
Router(config)# secure-policy-style advance
Router(config)# show secure-policy-style status
secure-policy-style: advance
After you run these command, go to the feature screen again in the web configurator. You will be prompted to log out and then log in again. Figure 424 Logout Prompt ![](images/99bca33cf15c4413e39998d84ffbc19d0b8a0823c62e57e2552cc66b6133172a.jpg) After you log in again, you will see the new profile screen for this feature. Figure 425 Configuration > Security Service > Reputation Filter > URL Threat Filter > Profile ![](images/162c971e1b31da40498c09731a80c459676edc04a6ecb916a0c41b7a0e294f6d.jpg) The following table describes the labels in this screen. Table 263 Configuration > Security Service > Reputation Filter > URL Threat Filter > Profile
LABEL DESCRIPTION
AddClick this to create a new entry. Select an entry and click Add to create a new entry after the selected entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveSelect an entry and click Remove to delete the selected entry.
#This field is a sequential value showing the number of the profile. The profile order is not important.
Name This displays the name of the profile created.
Description This displays the description of the profile.

34.3.1 Add or Edit a URL Threat Filter Profile

Click Add to create a new entry or select an existing entry and click Edit to open the following screen where you can create or modify the entry's settings. Figure 426 Configuration > Security Service > Reputation Filter > URL Threat Filter > Profile > Add/Edit ![](images/ade9e169c44ed97a7eeea1603d42508d6975d0d05b1416c84bfaffe916d9d9c1.jpg) The following table describes the labels in this screen. Table 264 Configuration > Security Service > Reputation Filter > URL Threat Filter > Profile > Add/Edit
LABEL DESCRIPTION
Configuration
Profile NameType the name of the profile. You may use 1-31 alphanumeric characters, underscores( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive. These are valid, unique profile names:My Profilemy ProfileMymy12_3-4These are invalid profile names:1mYProfileMy ProfileMy Profile?Whatalongprofilename123456789012
DescriptionType a description for the profile rule to help identify the purpose of rule. You may use 1-31 alphanumeric characters, underscores ( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive. This field is optional.
ActionSet what action the Zyxel Device takes when it detects a connection attempt to or from the web pages of the specified categories.block: Select this action to have the Zyxel Device block access to the web pages that match the categories that you select above.warn: Select this action to have the Zyxel Device display a warning message to the access requesters for the web pages before allowing users to access web pages that match the categories that you select above.pass: Select this action to have the Zyxel Device allow access to the web pages that match the categories that you select above.
Log These are the log options:no: Do not create a log when it detects a connection attempt to or from the web pages of the specified categories.log: Create a log on the Zyxel Device when it detects a connection attempt to or from the web pages of the specified categories.log alert: An alert is an emailed log for more serious events that may need more immediate attention. Select this option to have the Zyxel Device send an alert when a connection matches web pages of the specified categories.
Scan Options
Check White ListSelect this check box to have the Zyxel Device not perform the URL Threat filter check on URLs that match the white list entries.
Check Black ListSelect this check box to have the Zyxel Device perform the URL Threat filter check on URLs that match the black list entries.
Security Threat CategoriesSelect the categories of FQDNs that may pose a security threat to network devices behind the Zyxel Device.
AnonymizersSites and proxies that act as an intermediary for surfing to other Web sites in an anonymous fashion, whether to circumvent Web filtering or for other reasons.
Browser ExploitsSites that contain browser exploits. A browser exploit is any content that forces a web browser to perform operations that you do not explicitly intend.
Malicious DownloadsSites that have been identified as containing malicious downloads or malware harmful to a user's computer.
Malicious SitesSites that install unwanted software on a user's computer with the intent to enable third-party monitoring or make system changes without the user's consent.
Table 264 Configuration > Security Service > Reputation Filter > URL Threat Filter > Profile > Add/Edit
LABEL DESCRIPTION
PhishingSites that are used for deceptive or fraudulent purposes, such as stealing financial or other user account information. These sites are most often designed to appear as legitimate sites in order to mislead users into entering their credentials.
Spam URLs Sites that have been promoted through spam techniques.
Spyware Adware KeyloggersSites that contain spyware, adware or keyloggers.Spyware is a program installed on your computer, usually without your explicit knowledge, that captures and transmits personal information or Internet browsing habits and details to companies. Companies use this information to analyze browsing habits, to gather marketing data, and to sell your information to others.Key logger programs try to capture and steal your passwords and watch and record everything you do on your computer.Adware programs typically display blinking advertisements or pop-up windows when you perform a certain action. Adware programs are often installed in exchange for another service, such as the right to use a program without paying for it.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.
To link a profile to a policy, go to the Configuration > Security Policy > Policy Control screen, select a policy, and then click Edit. In the Edit Policy screen under Profile, select which profile you want to use for each security service. Figure 427 Configuration > Security Service > Policy Control > Profile ![](images/24594654a6be3c5fdea8313c41665d6c97704f870ed4c93a219772aa8bbdb704.jpg)

34.3.3 URL Threat Filter Advance Screen

The Configuration > Security Service > Reputation Filter > URL Threat Filter screen also changes when using profiles. Figure 428 Configuration > Security Service > Reputation Filter > URL Threat Filter > General ![](images/2b7e12399d8a1f5f5c87c668a14d34118a4bcea186de1b0d72a4af6841c95103.jpg) The following table describes the labels in this screen. Table 265 Configuration > Security Service > Reputation Filter > URL Threat Filter > General
LABEL DESCRIPTION
URL Blocking
EnableSelect this option to turn on URL blocking on the Zyxel Device.
Inspect all traffic, setting:Select this to have all traffic inspected by the default_profile. You cannot rename or delete the default_profile profile, but you can edit it by clicking the link here.
Inspect by policyIf you configured a specific profile in the Profile tab for this service, select this to have specific traffic inspected by that profile. You must bind the profile to a policy in Security Policy > Policy Control.
Message to display when a site is blocked
Denied Access MessageEnter a message to be displayed when the URL Threat filter blocks access to a web page. Use up to 127 characters (0-9a-zA-Z;/?:@&=+\._l~*')%. For example, "Access to this web page is not allowed. Please contact the network administrator".It is also possible to leave this field blank if you have a URL specified in the Redirect URL field. In this case if the URL Threat filter blocks access to a web page, the Zyxel Device just opens the web page you specified without showing a denied access message.
Redirect URLEnter the URL of the web page to which you want to send users when their web access is blocked by the URL Threat filter. The web page you specify here opens in a new frame below the denied access message.Use "http://" or "https://" followed by up to 262 characters (0-9a-zA-Z;/?:@&=+\._l~*')%. For example, http://192.168.1.17/blocked access.
Test URL Threat Category
URL to testEnter a URL using http://domain or https://domain and click the Query button to check if the domain belongs to a URL threat category.
ApplyClick Apply to save your changes.
ResetClick Reset to return the screen to its last-saved settings.

34.3.4 Remove Profiles

To remove profiles and revert to the default general security policy style, you must first make sure to change Inspect by policy to Inspect all traffic in the following security services: Anti-Malware, DNS Filter, URL Threat Filter, IDP, Email Security. Note: All profiles that you created will be removed from Security Policy > Policy Control. Run the following commands in the Zyxel Device Command Line Interface (CLI).
Router# configure terminal
Router(config)# secure-policy-style general
Router(config)# show secure-policy-style status
secure-policy-style: general 
Wait a minute and then go to the feature screen again in the web configurator. You will be prompted to log out and then log in again. Figure 429 Logout Prompt ![](images/63a9744bd6c19236f180a7597c84c444221998559ae540407ec3cb50d4ce1e4d.jpg) After you log in again, you will not see the profile screen for this feature.

35.1 Overview

This chapter introduces packet inspection IDP (Intrusion, Detection and Prevention), custom signatures, and updating signatures. An IDP system can detect malicious or suspicious packets and respond instantaneously. IDP on the Zyxel Device protects against network-based intrusions.

35.1.1 What You Can Do in this Chapter

- Use the Security Service > IDP screen (Section 35.2 on page 652) to view registration and signature information. - Use the Security Service > IDP > Custom Signature > Add screens (Section 35.3 on page 657) to create a new custom signature, edit an existing signature, delete existing signatures or save signatures to your computer. - Use the Security Service > IDP > White List screen (Section 35.4 on page 665) to list signatures that will be exempted from IDP inspection.

35.1.2 What You Need To Know

Packet Inspection Signatures

A signature is a pattern of malicious or suspicious packet activity. You can specify an action to be taken if the system matches a stream of data to a malicious signature. You can change the action in the profile screens. Packet inspection examine OSI (Open System Interconnection) layer-4 to layer-7 packet contents for malicious data. Generally, packet inspection signatures are created for known attacks while anomaly detection looks for abnormal behavior.

Applying Your IDP Configuration

Changes to the Zyxel Device's IDP settings affect new sessions, but not the sessions that already existed before you applied the new settings.

35.1.3 Before You Begin

\- Register for a trial IDP subscription in the Registration screen. This gives you access to free signature updates. This is important as new signatures are created as new attacks evolve. When the trial subscription expires, purchase and enter a license key using the same screens to continue the subscription.

35.2 The IDP Screen

An IDP profile is a set of packet inspection signatures. Click Configuration > Security Service > IDP to open this screen. Use this screen to view registration and signature information. Note: You must register in order to update packet inspection signatures. See the Registration screens. If you try to enable IDP when the IDP service has not yet been registered, a warning screen displays and IDP is not enabled. Click the IDP icon for more information on the Zyxel Device's security features. Figure 430 Configuration > Security Service > IDP ![](images/f4d92032d84bf51ebd072effd95d83f2febcdea45f4946bc500f74350c2e0956.jpg) The following table describes the fields in this screen. Table 266 Configuration > Security Service > IDP
LABEL DESCRIPTION
General Settings
EnableSelect this check box to activate the IDP feature which detects and prevents malicious or suspicious packets and responds instantaneously.
Query Signatures
NameType the name or part of the name of the signature(s) you want to find.
Signature ID Type the ID or part of the ID of the signature(s) you want to find.
Search all custom signaturesSelect this check box to include signatures you created or imported in the Custom Signatures screen in the search. You can search for specific signatures by name or ID. If the name and ID fields are left blank, then all signatures are searched according to the criteria you select.
SeveritySearch for signatures by severity level(s). Hold down the [Ctrl] key if you want to make multiple selections.These are the severities as defined in the Zyxel Device. The number in brackets is the number you use if using commands.Severe (5): These denote attacks that try to run arbitrary code or gain system privileges.High (4): These denote known serious vulnerabilities or attacks that are probably not false alarms.Medium (3): These denote medium threats, access control attacks or attacks that could be false alarms.Low (2): These denote mild threats or attacks that could be false alarms.Very-Low (1): These denote possible attacks caused by traffic such as Ping, trace route, ICMP queries etc.
Classification TypeSearch for signatures by attack type(s) (see Table 267 on page 654). Attack types are known as policy types in the group view screen. Hold down the [Ctrl] key if you want to make multiple selections.
PlatformSearch for signatures created to prevent intrusions targeting specific operating system(s). Hold down the [Ctrl] key if you want to make multiple selections.
ServiceSearch for signatures by IDP service group(s). See Table 267 on page 654 for group details. Hold down the [Ctrl] key if you want to make multiple selections.
ActionSearch for signatures by the response the Zyxel Device takes when a packet matches a signature.Hold down the [Ctrl] key if you want to make multiple selections.
Activation Search for activated and/or inactivated signatures here.
Log Search for signatures by log option here.
Query ResultThe results are displayed in a table showing the SID, Name, Severity, Classification Type, Platform, Service, Log, and Action criteria as selected in the search. Click the SID column header to sort search results by signature ID.
Custom Signature RulesUse this part of the screen to create, edit, delete or export (save to your computer) custom signatures.
Add Click this to create a new entry.
Edit Select an entry and click this to be able to modify it.
Remove Select an entry and click this to delete it.
ExportTo save an entry or entries as a file on your computer, select them and click Export. Click Save in the file download dialog box and then select a location and name for the file.Custom signatures must end with the 'rules' file name extension, for example, MySig.rules.
LABELDESCRIPTION
# This is the entry's index number in the list.
SIDSID is the signature ID that uniquely identifies a signature. Click the SID header to sort signatures in ascending or descending order. It is automatically created when you click the Add icon to create a new signature. You can edit the ID, but it cannot already exist and it must be in the 9000000 to 9999999 range.
NameThis is the name of your custom signature. Duplicate names can exist, but it is advisable to use unique signature names that give some hint as to intent of the signature and the type of attack it is supposed to prevent.
Customer Signature Rule ImportingUse this part of the screen to import custom signatures (previously saved to your computer) to the Zyxel Device.Note: The name of the complete custom signature file on the Zyxel Device is 'custom.rules'. If you import a file named 'custom.rules', then all custom signatures on the Zyxel Device are overwritten with the new file. If this is not your intention, make sure that the files you import are not named 'custom.rules'.
File PathType the file path and name of the custom signature file you want to import in the text box (or click Browse to find it on your computer) and then click Importing to transfer the file to the Zyxel Device.New signatures then display in the Zyxel Device IDP > Custom Signatures screen.
Signature InformationThe following fields display information on the current signature set that the Zyxel Device is using.
Current VersionThis field displays the IDP signature set version number. This number gets larger as the set is enhanced.
Signature NumberThis field displays the number of IDP signatures in this set. This number usually gets larger as the set is enhanced. Older signatures and rules may be removed if they are no longer applicable or have been supplanted by newer ones.
Released DateThis field displays the date and time the set was released.
Update SignaturesClick this link to go to the screen you can use to download signatures from the update server.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

Policy Types

This table describes Policy Types as categorized in the Zyxel Device. Table 267 Policy Types
POLICY TYPE DESCRIPTION
Access ControlAccess control refers to procedures and controls that limit or detect access. Access control attacks try to bypass validation checks in order to access network resources such as servers, directories, and files.
AnyAny attack includes all other kinds of attacks that are not specified in the policy such as password, spoof, hijack, phishing, and close-in.
Backdoor/Trojan HorseA backdoor (also called a trapdoor) is hidden software or a hardware mechanism that can be triggered to gain access to a program, online service or an entire computer system. A Trojan horse is a harmful program that is hidden inside apparently harmless programs or data.Although a virus, a worm and a Trojan are different types of attacks, they can be blended into one attack. For example, W32/Blaster and W32/Sasser are blended attacks that feature a combination of a worm and a Trojan.
BotNet A Botnet is a number of Internet computers that have been set up to forward transmissions including spam or viruses to other computers on the Internet though their owners are unaware of it. It is also a collection of Internet-connected programs communicating with other similar programs in order to perform tasks and participate in distributed Denial-Of-Service attacks.
Buffer OverflowA buffer overflow occurs when a program or process tries to store more data in a buffer (temporary data storage area) than it was intended to hold. The excess information can overflow into adjacent buffers, corrupting or overwriting the valid data held in them.Intruders could run codes in the overflow buffer region to obtain control of the system, install a backdoor or use the victim to launch attacks on other devices.
DoS/DDoSThe goal of Denial of Service (DoS) attacks is not to steal information, but to disable a device or network on the Internet.A Distributed Denial of Service (DDoS) attack is one in which multiple compromised systems attack a single target, thereby causing denial of service for users of the targeted system.
Instant MessengerIM (Instant Messenger) refers to chat applications. Chat is real-time, text-based communication between two or more users via networks-connected computers. After you enter a chat (or chat room), any room member can type a message that will appear on the monitors of all the other participants.
MailA Mail or email bombing attack involves sending several thousand identical messages to an electronic mailbox in order to overflow it, making it unusable.
MiscMiscellaneous attacks takes advantage of vulnerable computer networks and web servers by forcing cache servers or web browsers into disclosing user-specific information that might be sensitive and confidential. The most common type of Misc. attacks are HTTP Response Smuggling, HTTP Response Splitting and JSON Hijacking.
P2PPeer-to-peer (P2P) is where computing devices link directly to each other and can directly initiate communication with each other; they do not need an intermediary. A device can be both the client and the server. In the Zyxel Device, P2P refers to peer-to-peer applications such as e-Mule, e-Donkey, BitTorrent, iMesh, etc.
ScanA scan describes the action of searching a network for an exposed service. An attack may then occur once a vulnerability has been found. Scans occur on several network levels.A network scan occurs at layer-3. For example, an attacker looks for network devices such as a router or server running in an IP network.A scan on a protocol is commonly referred to as a layer-4 scan. For example, once an attacker has found a live end system, he looks for open ports.A scan on a service is commonly referred to a layer-7 scan. For example, once an attacker has found an open port, say port 80 on a server, he determines that it is a HTTP service run by some web server application. He then uses a web vulnerability scanner (for example, Nikto) to look for documented vulnerabilities.
SPAMSpam is unsolicited “junk” email sent to large numbers of people to promote products or services.
POLICY TYPEDESCRIPTION
Stream Media A StreamMedia attack occurs when a malicious network node downloads an overwhelming amount of media stream data that could potentially exhaust the entire system. This method allows users to send small requests messages that result in the streaming of large media objects, providing an opportunity for malicious users to exhaust resources in the system with little effort expended on their part.
TunnelA Tunneling attack involves sending IPv6 traffic over IPv4, slipping viruses, worms and spyware through the network using secret tunnels. This method infiltrates standard security measures through IPv6 tunnels, passing through IPv4 undetected. An external signal then triggers the malware to spring to life and wreak havoc from inside the network.
Virus/WormA computer virus is a small program designed to corrupt and/or alter the operation of other legitimate programs. A worm is a program that is designed to copy itself from one computer to another on a network. A worm's uncontrolled replication consumes system resources, thus slowing or stopping other tasks.
Web AttackWeb attacks refer to attacks on web servers such as IIS (Internet Information Services).

IDP Service Groups

An IDP service group is a set of related packet inspection signatures. Table 268 IDP Service Groups
WEB_PHP WEB_MISCWEB_IIS WEB_FRONTTPAGE
WEB_CGI WEB_ATTACKSTFTP TELNET
SQLSNMPSMTPRSERVICES
RPCPOP3POP2P2P
ORACLENNTPNETBIOSMYSQL
MISC_EXPLOITMISC_DDOSMISC_BACKDOORMISC
IMAPIMICMPFTP
FINGERDNSn/a

35.2.1 Query Example

This example shows a search with these criteria: - Severity: Severe • Classification Type: Misc - Platform: Windows • Service: Any - Actions: Any Figure 431 Query Example Search ![](images/be6ac84a1963629bdf1a19d052f8fd97e3f47b2f7d2e10d1190b0b0c33cad5e6.jpg)

35.3 IDP Custom Signatures

Create custom signatures for new attacks or attacks peculiar to your network. Custom signatures can also be saved to/from your computer so as to share with others. You need some knowledge of packet headers and attack types to create your own custom signatures.

IP Packet Header

These are the fields in an Internet Protocol (IP) version 4 packet header. Figure 432 IP v4 Packet Headers
VersionIHLType of ServiceTotal Length
IdentificationFlagsFragment Offset
Time To LiveProtocolHeader Checksum
Source IP Address
Destination IP Address
OptionsPadding
The header fields are discussed in the following table. Table 269 IP v4 Packet Headers
HEADER DESCRIPTION
Version The value 4 indicates IP version 4.
IHLIP Header Length is the number of 32 bit words forming the total length of the header (usually five).
Type of ServiceThe Type of Service, (also known as Differentiated Services Code Point (DSCP)) is usually set to 0, but may indicate particular quality of service needs from the network.
Total LengthThis is the size of the datagram in bytes. It is the combined length of the header and the data.
IdentificationThis is a 16-bit number, which together with the source address, uniquely identifies this packet. It is used during reassembly of fragmented datagrams.
FlagsFlags are used to control whether routers are allowed to fragment a packet and to indicate the parts of a packet to the receiver.
Fragment Offset This is a byte count from the start of the original sent packet.
Time To LiveThis is a counter that decrements every time it passes through a router. When it reaches zero, the datagram is discarded. It is used to prevent accidental routing loops.
ProtocolThe protocol indicates the type of transport packet being carried, for example, 1 = ICMP; 2= IGMP; 6 = TCP; 17= UDP.
Header ChecksumThis is used to detect processing errors introduced into the packet inside a router or bridge where the packet is not protected by a link layer cyclic redundancy check. Packets with an invalid checksum are discarded by all nodes in an IP network.
Source IP Address This is the IP address of the original sender of the packet.
Destination IP AddressThis is the IP address of the final destination of the packet.
OptionsIP options is a variable-length list of IP options for a datagram that define IP Security Option, IP Stream Identifier, (security and handling restrictions for the military), Record Route (have each router record its IP address), Loose Source Routing (specifies a list of IP addresses that must be traversed by the datagram), Strict Source Routing (specifies a list of IP addresses that must ONLY be traversed by the datagram), Timestamp (have each router record its IP address and time), End of IP List and No IP Options.
PaddingPadding is used as a filler to ensure that the IP packet is a multiple of 32 bits.
Select Configuration > Security Service. The Custom Signature Rules section shows a summary of all custom signatures created. Click the SID or Name heading to sort. Click the Add icon to create a new signature or click the Edit icon to edit an existing signature. You can also delete custom signatures here or save them to your computer. Note: The Zyxel Device checks all signatures and continues searching even after a match is found. If two or more rules have conflicting actions for the same packet, then the Zyxel Device applies the more restrictive action (reject-both, reject-receiver or reject-sender, drop, none in this order). If a packet matches a rule for reject-receiver and it also matches a rule for reject-sender, then the Zyxel Device will reject-both.

35.3.1 Add / Edit Custom Signatures

Click the Add icon to create a new signature or click the Edit icon to edit an existing signature on the screen as shown in Figure 430 on page 652. A packet must match all items you configure in this screen before it matches the signature. The more specific your signature (including packet contents), then the fewer false positives the signature will trigger. Try to write signatures that target a vulnerability, for example a certain type of traffic on certain operating systems, instead of a specific exploit. Figure 433 Configuration > Security Service > IDP > Custom Signatures > Add/Edit ![](images/27d618285f5b754e30d4e8d2bb1efecbd83c3f2625c7c5b1d0d3d05ae30f386b.jpg) The following table describes the fields in this screen. Table 270 Configuration > Security Service > IDP > Custom Signatures > Add/Edit
LABEL DESCRIPTION
NameType the name of this custom signature. You may use 1-31 alphanumeric characters, underscores( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive.Duplicate names can exist but it is advisable to use unique signature names that give some hint as to intent of the signature and the type of attack it is supposed to prevent. Refer to (but do not copy) the packet inspection signature names for hints on creating a naming convention.
Signature IDA signature ID is automatically created when you click the Add icon to create a new signature. You can edit the ID to create a new one (in the 900000 to 999999 range), but you cannot use one that already exists. You may want to do that if you want to order custom signatures by SID.
InformationUse the following fields to set general information about the signature as denoted below.
SeverityThe severity level denotes how serious the intrusion is. Categorize the seriousness of the intrusion here.
PlatformSome intrusions target specific operating systems only. Select the operating systems that the intrusion targets, that is, the operating systems you want to protect from this intrusion. SGI refers to Silicon Graphics Incorporated, who manufactures multi-user Unix workstations that run the IRIX operating system (SGI's version of UNIX). A router is an example of a network device.
Classification TypeCategorize the attack type here. See Table 267 on page 654 as a reference.
FrequencyRecurring packets of the same type may indicate an attack. Use the following field to indicate how many packets per how many seconds constitute an intrusion
ThresholdSelect Threshold and then type how many packets (that meet the criteria in this signature) per how many seconds constitute an intrusion.
Header Options
Network Protocol Configure signatures for IP version 4.
Type Of ServiceType of service in an IP header is used to specify levels of speed and/or reliability. Some intrusions use an invalid Type Of Service number. Select the check box, then select Equal or Not-Equal and then type in a number.
IdentificationThe identification field in a datagram uniquely identifies the datagram. If a datagram is fragmented, it contains a value that identifies the datagram to which the fragment belongs. Some intrusions use an invalid Identification number. Select the check box and then type in the invalid number that the intrusion uses.
FragmentationA fragmentation flag identifies whether the IP datagram should be fragmented, not fragmented or is a reserved bit. Some intrusions can be identified by this flag. Select the check box and then select the flag that the intrusion uses.
Fragment OffsetWhen an IP datagram is fragmented, it is reassembled at the final destination. The fragmentation offset identifies where the fragment belongs in a set of fragments. Some intrusions use an invalid Fragment Offset number. Select the check box, select Equal, Smaller or Greater and then type in a number
Time to LiveTime to Live is a counter that decrements every time it passes through a router. When it reaches zero, the datagram is discarded. Usually it's used to set an upper limit on the number of routers a datagram can pass through. Some intrusions can be identified by the number in this field. Select the check box, select Equal, Smaller or Greater and then type in a number.
IP OptionsIP options is a variable-length list of IP options for a datagram that define IP Security Option, IP Stream Identifier, (security and handling restrictions for the military), Record Route (have each router record its IP address), Loose Source Routing (specifies a list of IP addresses that must be traversed by the datagram), Strict Source Routing (specifies a list of IP addresses that must ONLY be traversed by the datagram), Timestamp (have each router record its IP address and time), End of IP List and No IP Options. IP Options can help identify some intrusions. Select the check box, then select an item from the list box that the intrusion uses
Same IPSelect the check box for the signature to check for packets that have the same source and destination IP addresses.
Transport ProtocolThe following fields vary depending on whether you choose TCP, UDP or ICMP.
Transport Protocol: TCP
Port Select the checkbox and then enter the source and destination TCP port numbers that will trigger this signature.
FlowThe selected keyword sets the criteria as to which traffic is matched. You can match traffic based on direction or whether the connection is established or not. You can also specify whether you want to match signatures per packet or in a stream of packets.Established: Match established connections.Stateless: Match packets that are not part of an established connection.To Client: Match packets that flow from server to client..To Server: Match packets that flow from client to server.From Client: Match packets that flow from client to server.From Servers: Match packets that flow from server to client.No Stream: Match packets that have not been reassembled by the stream engine. It will not match packets that have been reassembled.Only Stream: Match packets that have been reassembled.
Flags Select what TCPflag bits the signature should check.
Sequence Number Use this field to check for a specific TCP sequence number.
Ack Number Use this field to check for a specific TCP acknowledgment number.
Window Size Use this field to check for a specific TCP window size.
Transport Protocol: UDP
PortSelect the check box and then enter the source and destination UDP port numbers that will trigger this signature.
Transport Protocol: ICMP
Type Use this field to check for a specific ICMP type value.
Code Use this field to check for a specific ICMP code value.
IDUse this field to check for a specific ICMP ID value. This is useful for covert channel programs that use static ICMP fields when they communicate.
Sequence NumberUse this field to check for a specific ICMP sequence number. This is useful for covert channel programs that use static ICMP fields when they communicate.
Payload OptionsThe longer a payload option is, the more exact the match, the faster the signature processing. Therefore, if possible, it is recommended to have at least one payload option in your signature.
Payload SizeThis field may be used to check for abnormally sized packets or for detecting buffer overflows.Select the check box, then select Equal, Smaller or Greater and then type the payload size.Stream rebuilt packets are not checked regardless of the size of the payload.
Add Click this to create a new entry.
Edit Select an entry and click this to be able to modify it.
Remove Select an entry and click this to delete it.
# This is the entry's index number in the list.
OffsetThis field specifies where to start searching for a pattern within a packet. For example, an offset of 5 would start looking for the specified pattern after the first five bytes of the payload.
Content Type the content that the signature should search for in the packet payload.Hexadecimal code entered between pipes is converted to ASCII. For example, you could represent the ampersand as either & or |26| (26 is the hexadecimal code for the ampersand).
Case-insensitiveSelect Yes if content casing does NOT matter.
Decode as URIA Uniform Resource Identifier (URI) is a string of characters for identifying an abstract or physical resource (RFC 2396). A resource can be anything that has identity, for example, an electronic document, an image, a service ("today's weather report for Taiwan"), a collection of other resources. An identifier is an object that can act as a reference to something that has identity. Example URIs are:ftp://ftp.is.co.za/rfc/rfc1808.txt; ftp scheme for File Transfer Protocol serviceshttp://www.math.uio.no/faq/compression-faq/part1.html; http scheme for Hypertext Transfer Protocol servicesmailto:mduerst@ifi.unizh.ch; mailto scheme for electronic mail addressestelnet://melvyl.ucop.edu/; telnet scheme for interactive services via the TELNET ProtocolSelect Yes for the signature to search for normalized URI fields. This means that if you are writing signatures that includes normalized content, such as %2 for directory traversals, these signatures will not be triggered because the content is normalized out of the URI buffer.For example, the URI:/scripts/..%c0%af../winnt/system32/cmd.exe?/c+verwill get normalized into:/winnt/system32/cmd.exe?/c+ver
OKClick this button to save your changes to the Zyxel Device and return to the summary screen.
CancelClick this button to return to the summary screen without saving any changes.

35.3.2 Custom Signature Example

Before creating a custom signature, you must first clearly understand the vulnerability.

35.3.2.1 Understand the Vulnerability

Check the Zyxel Device logs when the attack occurs. Use web sites such as Google or Security Focus to get as much information about the attack as you can. The more specific your signature, the less chance it will cause false positives. As an example, say you want to check if your router is being overloaded with DNS queries so you create a signature to detect DNS query traffic.

35.3.2.2 Analyze Packets

Use the packet capture screen and a packet analyzer (also known as a network or protocol analyzer) such as Wireshark or Ethereal to investigate some more. Figure 434 DNS Query Packet Details ![](images/8e2854117be4418af4cc83c5781e5c2f6eb6561ae8029023940fb2421533bb6e.jpg) From the details about DNS query you see that the protocol is UDP and the port is 53. The type of DNS packet is standard query and the Flag is 0x0100 with an offset of 2. Therefore enter |010| as the first pattern. The final custom signature should look like as shown in the following figure. Figure 435 Example Custom Signature ![](images/e63127f2aab53e218dd823276bb11b317ecbd1b6b8f3e6121c44f4b27339d880.jpg)

35.3.3 Applying Custom Signatures

After you create your custom signature, it becomes available in an IDP profile (Configuration > Security Service > IDP > Profile > Edit screen). Custom signatures have an SID from 9000000 to 9999999. Search for, then activate the signature, configure what action to take when a packet matches it and if it should generate a log or alert in a profile. Then bind the profile to a zone.

35.3.4 Verifying Custom Signatures

Configure the signature to create a log when traffic matches the signature. (You may also want to configure an alert if it is for a serious attack and needs immediate attention.) After you apply the signature to a zone, you can see if it works by checking the logs (Monitor > Log). The Priority column shows warn for signatures that are configured to generate a log only. It shows critical for signatures that are configured to generate a log and alert. All IDP signatures come under the IDP category. The Note column displays ACCESS FORWARD when no action is configured for the signature. It displays ACCESS DENIED if you configure the signature action to drop the packet. The destination port is the service port (53 for DNS in this case) that the attack tries to exploit. Figure 436 Custom Signature Log ![](images/ccaf466add147cacebec786ea771f02aa2bf3e2c7c02a3c5e74a5f3af3549938.jpg)

35.4 The White List Screen

Use this screen to list signatures that will be exempted from IDP inspection. The Zyxel Device will exclude incoming packets with the listed signature(s) from being intercepted and inspected. Click Configuration > Security Service > IDP > White List to display the following screen. Use Add to put a new item in the list or Edit to change an existing one or Remove to delete an existing entry. Figure 437 Configuration > Security Service > IDP > White List ![](images/a9bcb730ae88e2bad548a32578e04b2905a8c19410c2f85f89947c92e6ce5ab5.jpg) The following table describes the fields in this screen. Table 271 Configuration > Security Service > IDP > White List
LABEL DESCRIPTION
White List Settings
Add Click this to create a new entry.
Edit Select an entry and click this to be able to modify it.
Remove Select an entry and click this to delete it.
# This is the entry's index number in the list.
Signature ID This field displays the signature ID of this entry.
Signature Name This field displays the signature name of this entry.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

35.5 IDP Profile

To use multiple profiles for this feature, run the following commands in the Zyxel Device Command Line Interface (CLI).
Router# configure terminal
Router(config)# secure-policy-style advance
Router(config)# show secure-policy-style status
secure-policy-style: advance
After you run these command, go to the feature screen again in the web configurator. You will be prompted to log out and then log in again. Figure 438 Logout Prompt ![](images/26b19d5a05d3212382869cb2dbd92c4c760bb1799dd1f7d3c93a1dcb64e0a03b.jpg) After you log in again, you will see the new profile screen for this feature. Figure 439 Configuration > Security Service > IDP> Profile ![](images/5dc9f4455ee4627ed87643f37af1e5801bfaa36193cd21095f291e967ade8d89.jpg) The following table describes the labels in this screen. Table 272 Configuration > Security Service > IDP > Profile
LABEL DESCRIPTION
AddClick this to create a new entry. Select an entry and click Add to create a new entry after the selected entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveSelect an entry and click Remove to delete the selected entry.
#This field is a sequential value showing the number of the profile. The profile order is not important.
Name This displays the name of the profile created.
Description This displays the description of the profile.

35.5.1 Add or Edit an IDP Profile

Click Add to create a new entry or select an existing entry and click Edit to open the following screen where you can create or modify the entry's settings. Figure 440 Configuration > Security Service > IDP > Profile > Add/Edit ![](images/496164be608d8bbe43ad0cded51cd8a536aa567449d85fed26338e91b0de301a.jpg) The following table describes the labels in this screen. Table 273 Configuration > Security Service > IDP
LABEL DESCRIPTION
Configuration
Profile Name Type thename of the profile. You may use 1-31 alphanumeric characters, underscores( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive. These are valid, unique profile names:My ProfilemYProfileMymy12_3-4These are invalid profile names:1mYProfileMy ProfileMyProfile?Whatalongprofilename123456789012
DescriptionType a description for the profile rule to help identify the purpose of rule. You may use 1-31 alphanumeric characters, underscores ( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive. This field is optional.
Query Signatures
NameType the name or part of the name of the signature(s) you want to find.
Signature ID Type theID or part of the ID of the signature(s) you want to find.
Search all custom signaturesSelect this check box to include signatures you created or imported in theCustom Signaturesscreen in the search. You can search for specific signatures by name or ID. If the name and ID fields are left blank, then all signatures are searched according to the criteria you select.
SeveritySearch for signatures by severity level(s). Hold down the [Ctrl] key if you want to make multiple selections.These are the severities as defined in the Zyxel Device. The number in brackets is the number you use if using commands.Severe(5): These denote attacks that try to run arbitrary code or gain system privileges.High(4): These denote known serious vulnerabilities or attacks that are probably not false alarms.Medium(3): These denote medium threats, access control attacks or attacks that could be false alarms.Low(2): These denote mild threats or attacks that could be false alarms.Very-Low(1): These denote possible attacks caused by traffic such as Ping, trace route, ICMP queries etc.
Classification TypeSearch for signatures by attack type(s) (seeTable 267 on page 654). Attack types are known as policy types in the group view screen. Hold down the [Ctrl] key if you want to make multiple selections.
PlatformSearch for signatures created to prevent intrusions targeting specific operating system(s). Hold down the [Ctrl] key if you want to make multiple selections.
ServiceSearch for signatures by IDP service group(s). SeeTable 267 on page 654for group details. Hold down the [Ctrl] key if you want to make multiple selections.
ActionSearch for signatures by the response the Zyxel Device takes when a packet matches a signature.Hold down the [Ctrl] key if you want to make multiple selections.
Activation Search foractivated and/or inactivated signatures here.
Log Search for signatures by log option here.
Query ResultThe results are displayed in a table showing theSID, Name, Severity, Classification Type, Platform, Service, Log, andActioncriteria as selected in the search. Click theSIDcolumn header to sort search results by signature ID.
OKClick OKto save your changes back to the Zyxel Device.
CancelClick Cancelto exit this screen without saving.
To link a profile to a policy, go to the Configuration > Security Policy > Policy Control screen, select a policy, and then click Edit. In the Edit Policy screen under Profile, select which profile you want to use for each security service. Figure 441 Configuration > Security Service > Policy Control > Profile ![](images/c8501e470b13540f5cc975f1bd2951bce835bd0e25310bb35d86a5cdb97a32c5.jpg)

35.5.3 The IDP Advance Screen

The Configuration > Security Service > IDP screen changes when using profiles. Figure 442 Configuration > Security Service > IDP Advance ![](images/b8d256a0f89cae3aae5b986fbc06f855891882d17390d4320087aa049ae9c3b8.jpg) The following table describes the fields in this screen. Table 274 Configuration > Security Service > IDP Advance
LABEL DESCRIPTION
General Settings
EnableSelect this check box to activate the IDP feature which detects and prevents malicious or suspicious packets and responds instantaneously.
Inspect all traffic, setting:Select this to have all traffic inspected by the default_profile. You cannot rename or delete the default_profile profile, but you can edit it by clicking the link here.
Inspect by policyIf you configured a specific profile in the Profile tab for this service, select this to have specific traffic inspected by that profile. You must bind the profile to a policy in Security Policy > Policy Control.
Custom Signature RulesUse this part of the screen to create, edit, delete or export (save to your computer) custom signatures.
Add Click this to create a new entry.
Edit Select an entry and click this to be able to modify it.
Remove Select an entry and click this to delete it.
ExportTo save an entry or entries as a file on your computer, select them and click Export. Click Save in the file download dialog box and then select a location and name for the file.Custom signatures must end with the 'rules' file name extension, for example, MySig.rules.
# This is the entry's index number in the list.
SIDSID is the signature ID that uniquely identifies a signature. Click the SID header to sort signatures in ascending or descending order. It is automatically created when you click the Add icon to create a new signature. You can edit the ID, but it cannot already exist and it must be in the 9000000 to 9999999 range.
NameThis is the name of your custom signature. Duplicate names can exist, but it is advisable to use unique signature names that give some hint as to intent of the signature and the type of attack it is supposed to prevent.
Customer Signature Rule ImportingUse this part of the screen to import custom signatures (previously saved to your computer) to the Zyxel Device.Note: The name of the complete custom signature file on the Zyxel Device is 'custom.rules'. If you import a file named 'custom.rules', then all custom signatures on the Zyxel Device are overwritten with the new file. If this is not your intention, make sure that the files you import are not named 'custom.rules'.
File PathType the file path and name of the custom signature file you want to import in the text box (or click Browse to find it on your computer) and then click Importing to transfer the file to the Zyxel Device.New signatures then display in the Zyxel Device IDP > Custom Signatures screen.
Signature InformationThe following fields display information on the current signature set that the Zyxel Device is using.
Current VersionThis field displays the IDP signature set version number. This number gets larger as the set is enhanced.
Signature NumberThis field displays the number of IDP signatures in this set. This number usually gets larger as the set is enhanced. Older signatures and rules may be removed if they are no longer applicable or have been supplanted by newer ones.
Released DateThis field displays the date and time the set was released.
Update SignaturesClick this link to go to the screen you can use to download signatures from the update server.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

35.5.4 Remove Profiles

To remove profiles and revert to the default general security policy style, you must first make sure to change Inspect by policy to Inspect all traffic in the following security services: Anti-Malware, DNS Filter, URL Threat Filter, IDP, Email Security. Note: All profiles that you created will be removed from Security Policy > Policy Control. Run the following commands in the Zyxel Device Command Line Interface (CLI).
Router# configure terminal
Router(config)# secure-policy-style general
Router(config)# show secure-policy-style status
secure-policy-style: general 
Wait a minute and then go to the feature screen again in the web configurator. You will be prompted to log out and then log in again. Figure 443 Logout Prompt ![](images/e10c87a8b4a6f4783907795891dcaf32e77164caa90a570b3f87b49754ae8fc7.jpg) After you log in again, you will not see the profile screen for this feature.

35.6 IDP Technical Reference

This section contains some background information on IDP.

Host Intrusions

The goal of host-based intrusions is to infiltrate files on an individual computer or server in with the goal of accessing confidential information or destroying information on a computer. You must install a host IDP directly on the system being protected. It works closely with the operating system, monitoring and intercepting system calls to the kernel or APIs in order to prevent attacks as well as log them. Disadvantages of host IDPs are that you have to install them on each device (that you want to protect) in your network and due to the necessarily tight integration with the host operating system, future operating system upgrades could cause problems.

Network Intrusions

Network-based intrusions have the goal of bringing down a network or networks by attacking computer(s), switch(es), router(s) or modem(s). If a LAN switch is compromised for example, then the whole LAN is compromised. Host-based intrusions may be used to cause network-based intrusions when the goal of the host virus is to propagate attacks on the network, or attack computer/server operating system vulnerabilities with the goal of bringing down the computer/server. Typical “network-based intrusions” are SQL slammer, Blaster, Nimda MyDoom etc.

Snort Signatures

You may want to refer to open source Snort signatures when creating custom Zyxel Device ones. Most Snort rules are written in a single line. Snort rules are divided into two logical sections, the rule header and the rule options as shown in the following example: alert tcp any any -> 192.168.1.0/24 111 (content:"|00 01 a5|"; msg:"mountd access"); The text up to the first parenthesis is the rule header and the section enclosed in parenthesis contains the rule options. The words before the colons in the rule options section are the option keywords. The rule header contains the rule's: - Action - Protocol - Source and destination IP addresses and netmasks - Source and destination ports information. The rule option section contains alert messages and information on which parts of the packet should be inspected to determine if the rule action should be taken. These are some equivalent Snort terms in the Zyxel Device. Table 275 Zyxel Device - Snort Equivalent Terms
ZYXEL DEVICE TERM SNORT EQUIVALENTTERM
Type Of Service tos
Identification id
Fragmentation fragbits
Fragmentation Offset fragoffset
Time to Live ttl
IP Options ipopts
Same IP sameip
Transport Protocol
Transport Protocol: TCP
Port (In Snort rule header)
Flow flow
Flags flags
Sequence Number seq
Ack Number ack
Window Sizewindow
Transport Protocol: UDP(In Snort rule header)
Port (In Snort rule header)
Transport Protocol: ICMP
Typeitype
Codeicode
IDicmp_id
Sequence Number icmp_seq
Payload Options(Snort rule options)
Payload Size dsize
Offset (relative to start of payload)offset
Relative to end of last matchdistance
Contentcontent
Case-insensitivenocase
Decode as URIuricontent
Note: Not all Snort functionality is supported in the Zyxel Device.

CHAPTER 36

Email Security

36.1 Overview

The email security feature can mark or discard spam (unsolicited commercial or junk email). Use the white list to identify legitimate email. Use the black list to identify spam email. The Zyxel Device can also check email against a DNS black list (DNSBL) of IP addresses of servers that are suspected of being used by spammers.

36.1.1 What You Can Do in this Chapter

- Use the Email Security screens (Section 36.3 on page 677) to turn email security on or off and manage email security policies. Also, you can enable and configure the mail scan functions and have the Zyxel Device check email against DNS Black Lists. - Use the Black/White List screens (Section 36.4 on page 679) to set up a black list to identify spam and a white list to identify legitimate email.

36.1.2 What You Need to Know

White List

Configure white list entries to identify legitimate email. The white list entries have the Zyxel Device classify any email that is from a specified sender or uses a specified header field and header value as being legitimate (see Email Headers for more on mail headers). The email security feature checks an email against the white list entries before doing any other email security checking. If the email matches a white list entry, the Zyxel Device classifies the email as legitimate and does not perform any more email security checking on that individual email. A properly configured white list helps keep important email from being incorrectly classified as spam. The white list can also increases the Zyxel Device's email security speed and efficiency by not having the Zyxel Device perform the full email security checking process on legitimate email.

Black List

Configure black list entries to identify spam. The black list entries have the Zyxel Device classify any email that is from or forwarded by a specified IP address or uses a specified header field and header value as being spam. If an email does not match any of the white list entries, the Zyxel Device checks it against the black list entries. The Zyxel Device classifies an email that matches a black list entry as spam and immediately takes the configured action for dealing with spam. If an email matches a blacklist entry, the Zyxel Device does not perform any more email security checking on that individual email. A properly configured black list helps catch spam email and increases the Zyxel Device's email security speed and efficiency.

SMTP and POP3

Simple Mail Transfer Protocol (SMTP) is the Internet's message transport standard. It controls the sending of email messages between servers. Email clients (also called email applications) then use mail server protocols such as POP (Post Office Protocol) or IMAP (Internet Message Access Protocol) to retrieve email. Email clients also generally use SMTP to send messages to a mail server. The older POP2 requires SMTP for sending messages while the newer POP3 can be used with or without it. This is why many email applications require you to specify both the SMTP server and the POP or IMAP server (even though they may actually be the same server). The Zyxel Device's email security feature checks SMTP (TCP port 25) and POP3 (TCP port 110) emails by default. You can also specify custom SMTP and POP3 ports for the Zyxel Device to check.

Email Headers

Every email has a header and a body. The header is structured into fields and includes the addresses of the recipient and sender, the subject, and other information about the email and its journey. The body is the actual message text and any attachments. You can have the Zyxel Device check for specific header fields with specific values. Email programs usually only show you the To:, From:, Subject:, and Date: header fields but there are others such as Received: and Content-Type:. To see all of an email's header, you can select an email in your email program and look at its properties or details. For example, in Microsoft's Outlook Express, select a mail and click File > Properties > Details. This displays the email's header. Click Message Source to see the source for the entire mail including both the header and the body.

Email Header Buffer Size

The Zyxel Device has a 5 K buffer for an individual email header. If an email's header is longer than 5 K, the Zyxel Device only checks up to the first 5 K.

DNSBL

A DNS Black List (DNSBL) is a server that hosts a list of IP addresses known or suspected of having sent or forwarded spam. A DNSBL is also known as a DNS spam blocking list. The Zyxel Device can check the routing addresses of email against DNSBLs and classify an email as spam if it was sent or forwarded by a computer with an IP address in the DNSBL.

Finding Out More

See Section 36.6 on page 689 for more background information on email security.

36.2 Before You Begin

- Before using the email security features (IP Reputation, Mail Content Analysis and Virus Outbreak Detection) you must activate your email security Service license. - Configure your zones before you configure email security.

36.3 The Email Security Screen

Click Configuration > Security Service > Email Security to open the Email Security screen. Use this screen to turn the email security feature on or off and manage email security policies. You can also select the action the Zyxel Device takes when the mail sessions threshold is reached. Click the Email Security icon for more information on the Zyxel Device's security features. Figure 444 Configuration > Security Service > Email Security ![](images/ae6522b06ad9c89022cbe10fee5a51df32988661628846b3d64bdf5778612101.jpg) The following table describes the labels in this screen. Table 276 Configuration > Security Service > Email Security
LABEL DESCRIPTION
General Settings
EnableSelect this check box to activate the settings in this section.
Check White ListSelect this check box to check email against the white list. The Zyxel Device classifies email that matches a white list entry as legitimate (not spam).
Check Black ListSelect this check box to check email against the black list. The Zyxel Device classifies email that matches a black list entry as spam.
Black List Spam TagEnter a message or label (up to 15 ASCII characters) to add to the mail subject of emails that match the Zyxel Device's spam black list.
Check Malicious MailSelect this to identify spam email by content, such as malicious content.
Malicious Mail TagEnter a message or label (up to 15 ASCII characters) to add to the beginning of the mail subject of emails that are determined to spam based on the mail content analysis.This tag is only added if the email security policy is configured to forward spam mail with a spam tag.
Check DNSBLSelect this check box to check email against the Zyxel Device's configured DNSBL domains. The Zyxel Device classifies email that matches a DNS black list as spam.
DNSBL Spam TagEnter a message or label (up to 15 ASCII characters) to add to the beginning of the mail subject of emails that have a sender or relay IP address in the header that matches a black list maintained by one of the DNSBL domains listed in the Zyxel Device.This tag is only added if the email security policy is configured to forward spam mail with a spam tag.
DNSBL Domain List
Add Click this to create a new entry.
EditSelect an entry and click this to be able to modify it.
Remove Select an entry and click this to delete it.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
StatusThe activate (light bulb) icon is lit when the entry is active and dimmed when the entry is inactive.
#This is the entry's index number in the list.
DNSBL DomainThis is the name of a domain that maintains DNSBL servers. Enter the domain that is maintaining a DNSBL.
Actions for Spam MailUse this section to set how the Zyxel Device is to handle spam mail.
SMTPSelect how the Zyxel Device is to handle spam SMTP mail.Select drop to discard spam SMTP mail.Select forward to allow spam SMTP mail to go through.Select forward with tag to add a spam tag to an SMTP spam mail's mail subject and send it on to the destination.
POP3Select how the Zyxel Device is to handle spam POP3 mail.Select forward to allow spam POP3 mail to go through.Select forward with tag to add a spam tag to an POP3 spam mail's mail subject and send it on to the destination.
LogSelect whether to have the ZyXEL device generate a log (log), log and alert (log alert) or neither (no) by default when traffic matches a signature in this category.
Table 276 Configuration > Security Service > Email Security
LABEL DESCRIPTION
Action taken when mail sessions threshold is reachedAn email session is when an email client and email server (or two email servers) connect through the Zyxel Device. Select how to handle concurrent email sessions that exceed the maximum number of concurrent email sessions that the email security feature can handle. See the chapter of product specifications for the threshold.SelectForward Sessionto have the Zyxel Device allow the excess email sessions without any spam filtering.SelectDrop Sessionto have the Zyxel Device drop mail connections to stop the excess email sessions. The email client or server will have to re-attempt to send or receive email later when the number of email sessions is under the threshold.
Query Timeout Settings
SMTPSelect how the Zyxel Device is to handle SMTP mail query timeout.Selectdropto discard SMTP mail.Selectforwardto allow SMTP mail to go through.Selectforward with tagto add a tag to an SMTP query timeout mail's mail subject and send it on to the destination.
POP3 Select how the Zyxel Device is to handle POP3 mail query timeout.Selectforwardto allow POP3 mail to go through.Selectforward with tagto add a tag to an POP3 query timeout mail's mail subject and send it on to the destination.
Timeout ValueSet how long the Zyxel Device waits for a reply from the mail scan server. If there is no reply before this time period expires, the Zyxel Device takes the action defined in the relevantActions when Query Timeout field.
Timeout TagEnter a message or label (up to 15 ASCII characters) to add to the mail subject of emails that the Zyxel Device forwards if queries to the mail scan servers time out.
Timeout X-HeaderSpecify the name and value for the X-Header to be added when queries to the mail scan servers time out.
DNSBL Settings
Max. IPs Checking Per MailSet the maximum number of sender and relay server IP addresses in the mail header to check against the DNSBL domain servers.
IP Selection Per MailSelectfirst N IPsto have the Zyxel Device start checking from the first IP address in the mail header. This is the IP of the sender or the first server that forwarded the mail.Selectlast N IPsto have the Zyxel Device start checking from the last IP address in the mail header. This is the IP of the last server that forwarded the mail.
ApplyClickApplyto save your changes back to the Zyxel Device.
ResetClickResetto return the screen to its last-saved settings.

36.4 The Black List / White List Screen

Click Configuration > Security Service > Email Security > Black /White List to display the Black List / White List screen. Configure the black list to identify spam email. You can create black list entries based on the sender's or relay server's IP address or email address. You can also create entries that check for particular email header fields with specific values or specific subject text. Click a column's heading cell to sort the table entries by that column's criteria. Click the heading cell again to reverse the sort order. Figure 445 Configuration > Security Service > Email Security > Black/White List ![](images/9593c82689e49f207ee4299505650f9f495e01d183ab9fcd2895b4876a50b795.jpg) The following table describes the labels in this screen. Table 277 Configuration > Security Service > Email Security > Black/White List
LABEL DESCRIPTION
Rule Summary
Add Click this to createa new entry.
Edit Select an entry andclick this to be able to modify it.
Remove Select an entryand click this to delete it.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
StatusThe activate (light bulb) icon is lit when the entry is active and dimmed when the entry is inactive.
# This is the entry's indexnumber in the list.
TypeThis field displays whether the entry is based on the email's subject, source or relay IP address, source email address, or header.
ContentThis field displays the subject content, source or relay IP address, source email address, or header value for which the entry checks.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

36.4.1 The Black or White List Add/Edit Screen

In the Black List or White List screen, click the Add icon or an Edit icon to display the following screen. Use this screen to configure an email security black list entry to identify spam email. You can create entries based on specific subject text, or the sender's or relay's IP address or email address. You can also create entries that check for particular header fields and values. Figure 446 Configuration > Security Service > Email Security > Black/White List > Black List (or White List) > Add ![](images/6a89c49f048a1957e1bb08ee5bcd4d08636ba6969996a7829772e658ba545bf0.jpg) The following table describes the labels in this screen. Table 278 Configuration > Security Service > Email Security > Black/White List > Black/White List > Add
LABEL DESCRIPTION
Enable RuleSelect this to have the Zyxel Device use this entry as part of the black or white list.To actually use the entry, you must also turn on the use of the list in the corresponding list screen, enable the email security feature in the email security general screen, and configure an email security policy to use the list.
TypeUse this field to base the entry on the email's subject, source or relay IP address, source email address, or header.SelectSubjectto have the Zyxel Device check email for specific content in the subject line.SelectIP Addressto have the Zyxel Device check email for a specific source or relay IP address.SelectIPv6 Addressto have the Zyxel Device check email for a specific source or relay IPv6 address.SelectE-Mail Addressto have the Zyxel Device check email for a specific source email address or domain name.SelectMail Headerto have the Zyxel Device check email for specific header fields and values. Configure black list header entries to check for email from bulk mail programs or with content commonly used in spam. Configure white list header entries to allow certain header values that identify the email as being from a trusted source.
Mail Subject KeywordThis field displays when you select theSubjecttype. Enter up to 63 ASCII characters of text to check for in email headers. Spaces are not allowed, although you could substitute a question mark (♀). SeeSection 36.4.2 on page 682for more details.
Sender or Mail Relay IP AddressThis field displays when you select theIP Addresstype. Enter an IP address in dotted decimal notation.
Sender or Mail Relay IPv6 AddressThis field displays when you select theIPv6 Addresstype. Enter an IPv6 address with prefix.
NetmaskThis field displays when you select theIP type. Enter the subnet mask here, if applicable.
Sender E-Mail AddressThis field displays when you select theE-Mailtype. Enter a keyword (up to 63 ASCII characters). SeeSection 36.4.2 on page 682for more details.
Mail Header Field NameThis field displays when you select theMail Headertype.Type the name part of an email header (the part that comes before the colon). Use up to 63 ASCII characters.For example, if you want the entry to check the "Received:" header for a specific mail server's domain, enter "Received" here.
Table 278 Configuration > Security Service > Email Security > Black/White List > Black/White List > Add
LABEL DESCRIPTION
Field Value KeywordThis field displays when you select the Mail Header type. Type the value part of an email header (the part that comes after the colon). Use up to 63 ASCII characters. For example, if you want the entry to check the "Received:" header for a specific mail server's domain, enter the mail server's domain here. See Section 36.4.2 on page 682 for more details.
OKClick OK to save your changes.
CancelClick Cancel to exit this screen without saving your changes.

36.4.2 Regular Expressions in Black or White List Entries

The following applies for a black or white list entry based on an email subject, email address, or email header value. - Use a question mark (?) to let a single character vary. For example, use "a?c" (without the quotation marks) to specify abc, acc and so on. - You can also use a wildcard (\*). For example, if you configure \*def.com, any email address that ends in def.com matches. So "mail.def.com" matches. - The wildcard can be anywhere in the text string and you can use more than one wildcard. You cannot use two wildcards side by side, there must be other characters between them. - The Zyxel Device checks the first header with the name you specified in the entry. So if the email has more than one "Received" header, the Zyxel Device checks the first one.

36.5 Email Security Profile

To use multiple profiles for this feature, run the following commands in the Zyxel Device Command Line Interface (CLI).
Router# configure terminal
Router(config)# secure-policy-style advance
Router(config)# show secure-policy-style status
secure-policy-style: advance
After you run these command, go to the feature screen again in the web configurator. You will be prompted to log out and then log in again. Figure 447 Logout Prompt ![](images/f40801f081fc9b2679efc0d6dbe74c5766f3ad8feb0cfc0c8ba2ef4753bc3c84.jpg) After you log in again, you will see the new profile screen for this feature. Figure 448 Configuration > Security Service > Email Security > Profile ![](images/fdd90578531e49dfe6d002f0fde61cd1df91c1e820d377f22d32e6898a028999.jpg) The following table describes the labels in this screen. Table 279 Configuration > Security Service >> Profile
LABEL DESCRIPTION
AddClick this to create a new entry. Select an entry and click Add to create a new entry after the selected entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveSelect an entry and click Remove to delete the selected entry.
#This field is a sequential value showing the number of the profile. The profile order is not important.
Name This displaysthe name of the profile created.
Description This displays the description of the profile.
Scan OptionsThis displays which lists are checked for email security: White List (WL), Black List (BL), Malicious Mail, DNSBL.

36.5.1 Add or Edit Email Security Profile

Click Add to create a new entry or select an existing entry and click Edit to open the following screen where you can create or modify the entry's settings. Figure 449 Configuration > Security Service > Email Security > Profile > Add/Edit ![](images/37f26afec99d44dcff9e63edb4cacae26945dd2df4e6cb915e3c7054e5ab02d8.jpg) The following table describes the labels in this screen. Table 280 Configuration > Security Service > Email Security Profile > Add/Edit
LABEL DESCRIPTION
General Settings
NameType the name of the profile. You may use 1-31 alphanumeric characters, underscores( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive. These are valid, unique profile names:My ProfilemYProfileMymy12_3-4These are invalid profile names:1mYProfileMy ProfileMyProfile?Whatalongprofilename123456789012
DescriptionType a description for the profile rule to help identify the purpose of rule. You may use 1-31 alphanumeric characters, underscores ( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive. This field is optional.
LogSelect whether to have the ZyXEL device generate a log (log). log and alert (log alert) or neither (no) by default when traffic matches a signature in this category.
Scan Options
Check White ListSelect this check box to check email against the white list. The Zyxel Device classifies email that matches a white list entry as legitimate (not spam).
Check Black ListSelect this check box to check email against the black list. The Zyxel Device classifies email that matches a black list entry as spam.
Check Malicious MailSelect this to identify spam email by content, such as malicious content.
Check DNSBLSelect this check box to check email against the Zyxel Device's configured DNSBL domains. The Zyxel Device classifies email that matches a DNS black list as spam.
Actions for Spam MailUse this section to set how the Zyxel Device is to handle spam mail.
SMTP Select how theZyxel Device is to handle spam SMTP mail.Select drop to discard spam SMTP mail.Select forward to allow spam SMTP mail to go through.Select forward with tag to add a spam tag to an SMTP spam mail's mail subject and send it on to the destination.
POP3 Select how theZyxel Device is to handle spam POP3 mail.Select forward to allow spam POP3 mail to go through.Select forward with tag to add a spam tag to an POP3 spam mail's mail subject and send it on to the destination.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.
To link a profile to a policy, go to the Configuration > Security Policy > Policy Control screen, select a policy, and then click Edit. In the Edit Policy screen under Profile, select which profile you want to use for each security service. Figure 450 Configuration > Security Service > Policy Control > Profile ![](images/b99a482885c2026e1febd7602bfe1424b83e16ebbaf21b4b493ed9f12a0b3c46.jpg)

36.5.3 The Email Security Advance Screen

The Configuration > Security Service > Email Security screen changes when using profiles. Figure 451 Configuration > Security Service > Email Security Advance ![](images/b0fe1cdc10d47da18675f8b25d7807c5b8214ed82b1781f1878a90d056d52676.jpg) The following table describes the labels in this screen. Table 281 Configuration > Security Service > Email Security Advance
LABEL DESCRIPTION
General Settings
EnableSelect this check box to activate the settings in this section.
Inspect all traffic, setting:Select this to have all traffic inspected by the default_profile. You cannot rename or delete the default_profile profile, but you can edit it by clicking the link here.
Inspect by policyIf you configured a specific profile in the Profile tab for this service, select this to have specific traffic inspected by that profile. You must bind the profile to a policy in Security Policy > Policy Control.
Enable Malicious MailSelect this to identify spam email by content, such as malicious content.
Malicious Mail TagEnter a message or label (up to 15 ASCII characters) to add to the beginning of the mail subject of emails that are determined to spam based on the mail content analysis.This tag is only added if the email security policy is configured to forward spam mail with a spam tag.
Enable DNSBLSelect this check box to check email against the Zyxel Device's configured DNSBL domains. The Zyxel Device classifies email that matches a DNS black list as spam.
LABELDESCRIPTION
DNSBL Spam TagEnter a message or label (up to 15 ASCII characters) to add to the beginning of the mail subject of emails that have a sender or relay IP address in the header that matches a black list maintained by one of the DNSBL domains listed in the Zyxel Device.This tag is only added if the email security policy is configured to forward spam mail with a spam tag.
DNSBL Domain List
Add Click this to create a new entry.
Edit Select an entry and click this to be able to modify it.
Remove Select an entry and click this to delete it.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
StatusThe activate (light bulb) icon is lit when the entry is active and dimmed when the entry is inactive.
# This is the entry's index number in the list.
DNSBL DomainThis is the name of a domain that maintains DNSBL servers. Enter the domain that is maintaining a DNSBL.
Action
Action taken when mail sessions threshold is reachedAn email session is when an email client and email server (or two email servers) connect through the Zyxel Device. Select how to handle concurrent email sessions that exceed the maximum number of concurrent email sessions that the email security feature can handle.See the chapter of product specifications for the threshold.Select Forward Session to have the Zyxel Device allow the excess email sessions without any spam filtering.Select Drop Session to have the Zyxel Device drop mail connections to stop the excess email sessions. The email client or server will have to re-attempt to send or receive email later when the number of email sessions is under the threshold.
Query Timeout Settings
SMTPSelect how the Zyxel Device is to handle SMTP mail query timeout.Select drop to discard SMTP mail.Select forward to allow SMTP mail to go through.Select forward with tag to add a tag to an SMTP query timeout mail's mail subject and send it on to the destination.
POP3 Select how the Zyxel Device is to handle POP3 mail query timeout.Select forward to allow POP3 mail to go through.Select forward with tag to add a tag to an POP3 query timeout mail's mail subject and send it on to the destination.
Timeout ValueSet how long the Zyxel Device waits for a reply from the mail scan server. If there is no reply before this time period expires, the Zyxel Device takes the action defined in the relevantActions when Query Timeout field.
Timeout TagEnter a message or label (up to 15 ASCII characters) to add to the mail subject of emails that the Zyxel Device forwards if queries to the mail scan servers time out.
Timeout X-HeaderSpecify the name and value for the X-Header to be added when queries to the mail scan servers time out.
DNSBL Settings
Max. IPs Checking Per MailSet the maximum number of sender and relay server IP addresses in the mail header to check against the DNSBL domain servers.
LABEL DESCRIPTION
IP Selection Per MailSelect first N IPs to have the Zyxel Device start checking from the first IP address in the mail header. This is the IP of the sender or the first server that forwarded the mail.Select last N IPs to have the Zyxel Device start checking from the last IP address in the mail header. This is the IP of the last server that forwarded the mail.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

36.5.4 Remove Profiles

To remove profiles and revert to the default general security policy style, you must first make sure to change Inspect by policy to Inspect all traffic in the following security services: Anti-Malware, DNS Filter, URL Threat Filter, IDP, Email Security. Note: All profiles that you created will be removed from Security Policy > Policy Control. Run the following commands in the Zyxel Device Command Line Interface (CLI).
Router# configure terminal
Router(config)# secure-policy-style general
Router(config)# show secure-policy-style status
secure-policy-style: general 
Wait a minute and then go to the feature screen again in the web configurator. You will be prompted to log out and then log in again. Figure 452 Logout Prompt ![](images/cb7ecabdeab88126f3b802156140aad21bd9d186065909f7fa880854ca7ee266.jpg) After you log in again, you will not see the profile screen for this feature.

36.6 Email Security Technical Reference

Here is more detailed email security information.

DNSBL

- The Zyxel Device checks only public sender and relay IP addresses, it does not check private IP addresses. - The Zyxel Device sends a separate query (DNS lookup) for each sender or relay IP address in the email's header to each of the Zyxel Device's DNSBL domains at the same time. - The DNSBL servers send replies as to whether or not each IP address matches an entry in their list. Each IP address has a separate reply. - As long as the replies are indicating the IP addresses do not match entries on the DNSBL lists, the Zyxel Device waits until it receives at least one reply for each IP address. - If the Zyxel Device receives a DNSBL reply that one of the IP addresses is in the DNSBL list, the Zyxel Device immediately classifies the email as spam and takes the email security policy's configured action for spam. The Zyxel Device does not wait for any more DNSBL replies. - If the Zyxel Device receives at least one non-spam reply for each of an email's routing IP addresses, the Zyxel Device immediately classifies the email as legitimate and forwards it. - Any further DNSBL replies that come after the Zyxel Device classifies an email as spam or legitimate have no effect. - The Zyxel Device records DNSBL responses for IP addresses in a cache for up to 72 hours. The Zyxel Device checks an email's sender and relay IP addresses against the cache first and only sends DNSBL queries for IP addresses that are not in the cache. Here is an example of an email classified as spam based on DNSBL replies. Figure 453 DNSBL Spam Detection Example ![](images/125a973bbd428aebda4733fcf5522800a667ae4bfcc5dc4d644f6d02cc3e3972.jpg)
flowchart
graph TD
    A["IPs: a.a.a.a\nb.b.b.b"] --> B["1"]
    B --> C["4"]
    C --> D["No communication symbol"]
    D --> E["2: DNSBL A"]
    E --> F["3: DNSBL C"]
    F --> G["2: DNSBL B"]
    G --> H["3: DNSBL C"]
    H --> I["2: Not span"]
    I --> J["2: Not span"]
    J --> K["2: Not span"]
    K --> L["2: Not span"]
    L --> M["2: Not span"]
    M --> N["2: Not span"]
    N --> O["2: Not span"]
    O --> P["2: Not span"]
    P --> Q["2: Not span"]
    Q --> R["2: Not span"]
    R --> S["2: Not span"]
    S --> T["2: Not span"]
    T --> U["2: Not span"]
    U --> V["2: Not span"]
    V --> W["2: Not span"]
    W --> X["2: Not span"]
    X --> Y["2: Not span"]
    Y --> Z["2: Not span"]
    Z --> AA["2: Not span"]
    AA --> AB["2: Not span"]
    AB --> AC["2: Not span"]
    AC --> AD["2: Not span"]
    AD --> AE["2: Not span"]
    AE --> AF["2: Not span"]
    AF --> AG["2: Not span"]
    AG --> AH["2: Not span"]
    AH --> AI["2: Not span"]
    AI --> AJ["2: Not span"]
    AJ --> AK["2: Not span"]
    AK --> AL["2: Not span"]
    AL --> AM["2: Not span"]
    AM --> AN["2: Not span"]
    AN --> AO["2: Not span"]
    AO --> AP["2: Not span"]
    AP --> AQ["2: Not span"]
    AQ --> AR["2: Not span"]
    AR --> AS["2: Not span"]
    AS --> AT["2: Not span"]
    AT --> AU["2: Not span"]
    AU --> AV["2: Not span"]
    AV --> AW["2: Not span"]
    AW --> AX["2: Not span"]
    AX --> AY["2: Not span"]
    AY --> AZ["2: Not span"]
    AZ --> BA["2: Not span"]
    BA --> BB["2: Not span"]
    BB --> BC["2: Not span"]
    BC --> BD["2: Not span"]
    BD --> BE["2: Not span"]
    BE --> BF["2: Not span"]
    BF --> BG["2: Not span"]
    BG --> BH["2: Not span"]
    BH --> BI["2: Not span"]
    BI --> BJ["2: Not span"]
    BJ --> BK["2: Not span"]
    BK --> BL["2: Not span"]
    BL --> BM["2: Not span"]
    BM --> BN["2: Not span"]
    BN --> BO["2: Not span"]
    BO --> BP["2: Not span"]
    BP --> BQ["2: Not span"]
    BQ --> BR["2: Not span"]
    BR --> BS["2: Not span"]
    BS --> BT["2: Not span"]
    BT --> BU["2: Not span"]
    BU --> BV["2: Not span"]
    BV --> BW["2: Not span"]
    BW --> BX["2: Not span"]
    BX --> BY["2: Not span"]
    BY --> BZ["2: Not span"]
    BZ --> CA["2: Not span"]
    CA --> CB["2: Not span"]
    CB --> CC["2: Not span"]
    CC --> CD["2: Not span"]
    CD --> CE["2: Not span"]
    CE --> CF["2: Not span"]
    CF --> CG["2: Not span"]
    CG --> CH["2: Not span"]
    CH --> CI["2: Not span"]
    CI --> CJ["2: Not span"]
    CJ --> CK["2: Not span"]
1 The Zyxel Device receives an email that was sent from IP address a.a.a.a and relayed by an email server at IP address b.b.b.b. The Zyxel Device sends a separate query to each of its DNSBL domains for IP address a.a.a.a. The Zyxel Device sends another separate query to each of its DNSBL domains for IP address b.b.b.b. 2 DNSBL A replies that IP address a.a.a.a does not match any entries in its list (not spam). 3 DNSBL C replies that IP address b.b.b.b matches an entry in its list. 4 The Zyxel Device immediately classifies the email as spam and takes the action for spam that you defined in the email security policy. In this example it was an SMTP mail and the defined action was to drop the mail. The Zyxel Device does not wait for any more DNSBL replies. Here is an example of an email classified as legitimate based on DNSBL replies. Figure 454 DNSBL Legitimate Email Detection Example ![](images/751f2541f1b589416c373c6aa3b1bcd432592eb3479f0a674e4f719c1167e473.jpg)
flowchart
graph TD
    A["IPs: c.c.c.c d.d.d.d"] --> B["1"]
    B --> C["DNSBL A"]
    B --> D["DNSBL B"]
    B --> E["DNSBL C"]
    F["4"] --> G["1"]
    G --> H["1"]
    H --> I["2"]
    I --> J["3"]
    J --> K["2"]
    K --> L["1"]
    L --> M["2"]
    M --> N["3"]
    N --> O["2"]
    O --> P["1"]
    P --> Q["2"]
    Q --> R["3"]
    R --> S["2"]
    S --> T["1"]
    T --> U["2"]
    U --> V["3"]
    V --> W["2"]
    W --> X["1"]
    X --> Y["2"]
    Y --> Z["3"]
    Z --> AA["2"]
    AA --> AB["1"]
    AB --> AC["2"]
    AC --> AD["3"]
    AD --> AE["2"]
    AE --> AF["1"]
    AF --> AG["2"]
    AG --> AH["3"]
    AH --> AI["2"]
    AI --> AJ["1"]
    AJ --> AK["2"]
    AK --> AL["3"]
    AL --> AM["2"]
    AM --> AN["1"]
    AN --> AO["2"]
    AO --> AP["3"]
    AP --> AQ["2"]
    AQ --> AR["1"]
    AR --> AS["2"]
    AS --> AT["3"]
    AT --> AU["2"]
    AU --> AV["1"]
    AV --> AW["2"]
    AW --> AX["3"]
    AX --> AY["2"]
    AY --> AZ["1"]
    AZ --> BA["2"]
    BA --> BB["3"]
    BB --> BC["2"]
    BC --> BD["1"]
    BD --> BE["2"]
    BE --> BF["3"]
    BF --> BG["2"]
    BG --> BH["1"]
    BH --> BI["2"]
    BI --> BJ["3"]
    BJ --> BK["2"]
    BK --> BL["1"]
    BL --> BM["2"]
    BM --> BN["3"]
    BN --> BO["2"]
    BO --> BP["1"]
    BP --> BQ["2"]
    BQ --> BR["3"]
1 The Zyxel Device receives an email that was sent from IP address c.c.c.c and relayed by an email server at IP address d.d.d.d. The Zyxel Device sends a separate query to each of its DNSBL domains for IP address c.c.c.c. The Zyxel Device sends another separate query to each of its DNSBL domains for IP address d.d.d.d. 2 DNSBL B replies that IP address d.d.d.d does not match any entries in its list (not spam). 3 DNSBL C replies that IP address c.c.c.c does not match any entries in its list (not spam). 4 Now that the Zyxel Device has received at least one non-spam reply for each of the email's routing IP addresses, the Zyxel Device immediately classifies the email as legitimate and forwards it. The Zyxel Device does not wait for any more DNSBL replies. If the Zyxel Device receives conflicting DNSBL replies for an email routing IP address, the Zyxel Device classifies the email as spam. Here is an example. Figure 455 Conflicting DNSBL Replies Example ![](images/09b8c4b0931b54619fca8281cae88d9dac132a0f6a305e99899aed0bb876e299.jpg)
flowchart
graph TD
    A["IPs: a.b.c.d w.x.y.z"] --> B["1"]
    B --> C["..."]
    C --> D["4"]
    D --> E["No IP Request"]
    E --> F["2: a.b.c.d? w.xy.z?"]
    F --> G["3: a.b.c.d? w.x.y.z?"]
    G --> H["2: a.b.c.d Not spam"]
    H --> I["3: a.b.c.d Spam!"]
    I --> J["2: DNSBL A"]
    I --> K["3: DNSBL B"]
    I --> L["3: DNSBL C"]
1 The Zyxel Device receives an email that was sent from IP address a.b.c.d and relayed by an email server at IP address w.x.y.z. The Zyxel Device sends a separate query to each of its DNSBL domains for IP address a.b.c.d. The Zyxel Device sends another separate query to each of its DNSBL domains for IP address w.x.y.z. 2 DNSBL A replies that IP address a.b.c.d does not match any entries in its list (not spam). 3 While waiting for a DNSBL reply about IP address w.x.y.z, the Zyxel Device receives a reply from DNSBL B saying IP address a.b.c.d is in its list. 4 The Zyxel Device immediately classifies the email as spam and takes the action for spam that you defined in the email security policy. In this example it was an SMTP mail and the defined action was to drop the mail. The Zyxel Device does not wait for any more DNSBL replies.

CHAPTER 37

SSL Inspection

37.1 Overview

Secure Socket Layer (SSL) traffic, such as https://www.google.com/HTTPS, FTPs, POP3s, SMTPs, etc. is encrypted, and cannot be inspected using Security Service profiles such as App Patrol, Content Filter, Intrusion, Detection and Prevention (IDP), or Anti-Malware. The Zyxel Device uses SSL Inspection to decrypt SSL traffic, sends it to the Security Service engines for inspection, then encrypts traffic that passes inspection and forwards it to the destination server, such as Google. An example process is shown in the following figure. User U sends a HTTPS request (SSL) to destination server D, via the Zyxel Device, Z. The traffic matches an SSL Inspection profile in a security policy, so the Zyxel Device decrypts the traffic using SSL Inspection. The decrypted traffic is then inspected by the Security Service profiles in the same security profile that matched the SSL Inspection profile. If all is OK, then the Zyxel Device re-encrypts the traffic using SSL Inspection and forwards it to the destination server D. SSL traffic could be in the opposite direction for other examples. Figure 456 SSL Inspection Overview ![](images/6ab586a71d73d3f5f76acbb144867285bc2e7c11bb59c5755e39546a292bbde0.jpg)
flowchart
graph LR
    U["HTTP"] --> Z["Z"]
    Z --> D["D"]
    Z -->|SSL\nInspection\nDecrypt| Z
    Z -->|Security Service\nAP\nCF\nIDP\nAnti-Malware| Z
    Z -->|SSL\nInspection\nEncrypt| D
Note: Email security cannot be applied to traffic decrypted by SSL Inspection.

37.1.1 What You Can Do in this Chapter

- Use the Security Service > SSL Inspection > Profile screen (Section 37.2 on page 694) to view SSL Inspection profiles. Click the Add or Edit icon in this screen to configure the CA certificate, action and log in an SSL Inspection profile. - Use the Security Service > SSL Inspection > Exclude List screens (Section 37.3 on page 701) to create a whitelist of destination servers to which traffic is passed through uninspected. - Use the Security Service > SSL Inspection > Certificate Update screens (Section 37.4 on page 703) to update the latest certificates of servers using SSL connections to the Zyxel Device network

37.1.2 What You Need To Know

SSL Inspection supports the following TLS protocols and encryption algorithms - SSLv3 AES-CBC - TLS1.0 AES-CBC • TLS1.2 AES-CBC/AES-GCM • TLS1.3 AES-GCM (no key update support nor 0-RTT) \- SSL Inspection does not support the following: - Compression Support - Client Authentication

37.1.3 What You Can Do in this Chapter

- See Configuration > Object > Certificate > My Certificates for information on creating certificates on the Zyxel Device. - See Monitor > Security Statistics > SSL Inspection to get usage data and easily add a destination server to the whitelist of exclusion servers. - See Configuration > Security Policy > Policy Control > Policy to bind an SSL Inspection profile to a traffic flow(s).

37.1.4 Before You Begin

- If you don't want to use the default Zyxel Device certificate, then create a new certificate in Object > Certificate > My Certificates. - Decide what destination servers to which traffic is sent directly without inspection. This may be a matter of privacy and legality regarding inspecting an individual's encrypted session, such as financial websites. This may vary by locale.

37.2 The SSL Inspection Profile Screen

An SSL Inspection profile is a template with pre-configured certificate, action and log. Click Configuration > Security Service > SSL Inspection > Profile to open this screen. Figure 457 Configuration > Security Service > SSL Inspection > Profile ![](images/94bf6061a245cb9d32efe1b3d325559b4fab4b43f7ff756bb5afefff8c3012a3.jpg) The following table describes the fields in this screen. Table 282 Configuration > Security Service > SSL Inspection > Profile
LABEL DESCRIPTION
General Settings
Server Signed Certificate Key ModeWith SSL inspection, the Zyxel Device acts as a 'man-in-the-middle' between a client and a remote server, when the client and server are communicating using an SSL-encrypted session. Every time the client and server send data to each other, the Zyxel Device decrypts the sender's encrypted data, scans the plain data for threats, re-encrypts the data, and then sends the encrypted data to the receiver.For outgoing sessions from the client to the remote server, the Zyxel Device creates a virtual server to decrypt data and a virtual client to re-encrypt data.For incoming sessions from the remote server to the client, the Zyxel Device creates a virtual client to decrypt data, and a virtual server to re-encrypt data.To perform SSL Inspection for clients using SSL (HTTPS, SSH, SMTP) through the Zyxel Device, the Zyxel Device must check that the server's certificate with corresponding public key are valid and were issued by a Certificate Authority (CA) listed in the Zyxel Device's list of trusted CAs. According to the selected key mode RSA 1024, RSA 2048, ECDSA-RSA-1024 or ECDSA-RSA-2048, the Zyxel Device will construct the corresponding self-signed certificate for the virtual server.RSA is a public-key cryptosystem used for data encryption or signing messages. For data encryption, the encryption key is public and the decryption key is private. For signing messages, the signing key is private and the verification key is public. Elliptic Curve Cryptography (ECC) is a public-key cryptosystem based on elliptic curve theory, and more efficient than RSA. ECC allows smaller keys compared to RSA to provide equivalent security. For example, a 224-bit elliptic curve public key should provide comparable security to a 2048-bit RSA public key.ECDSA-RSA-1024 indicates Zyxel Device support for clients that support both ECDSA-256 and RSA-1024 with ECDSA-256 having higher priority, that is ECDSA-256 is used by the virtual server, if a client supports both ECDSA-256 and RSA-1024.ECDSA-RSA-2048 indicates Zyxel Device support for clients that support both ECDSA-256 and RSA-2048 with ECDSA-256 having higher priority, that is ECDSA-256 is used by the virtual server, if a client supports both ECDSA-256 and RSA-2048.Select a mode that the client's browser, FTP client, or mail client supports. The Zyxel Device will use different keys (cryptosystems) for each client according to the client's support list.For example, if there are three clients behind a Zyxel Device with the following key mode support:Client 1 - RSA-1024Client 2 - RSA-2048 and RSA-1024Client 3 - ECDSA-256 and RSA-2048.If you set the key mode to ECDSA-RSA-1024, then the following will be used by each client:Client 1 - RSA-1024Client 2 - RSA-1024Client 3 - ECDSA-256.If you set the key mode to ECDSA-RSA-2048, then the following will be used by each client:Client 1 - sessions will not be processed (pass) by SSL inspectionClient 2 - RSA-2048Client 3 - ECDSA-256.
Profile Management
AddClick Add to create a new profile.
Edit Select an entry and click this to be able to modify it.
Remove Select an entry and click this to delete it.
ReferencesSelect an entry and clickReferencesto open a screen that shows which settings use the entry. Click Refresh to update information on this screen.
# This is the entry's index number in the list.
Name This displays the name of the profile.
Description This displays the description of the profile.
CA CertificateThis displays the CA certificate being used in this profile.
Reference This displays the number of times an object reference is used in a profile.
ActionClick this icon to apply the entry to a security policy.Go to theConfiguration > Security Policy > Policy Controlscreen to check the result.

37.2.1 Apply to a Security Policy

Click the icon in the Action field to apply the entry to a security policy. Go to the Configuration > Security Policy > Policy Control screen to check the result. Figure 458 Configuration > Security Service > SSL Inspection > Action ![](images/f9de825fe75cb5d37d90c11cbd8066004c6c18a1b2c788c0904c580379c3d587.jpg) The following table describes the labels in this screen. Table 283 Configuration > Security Service > SSL Inspection > Action
LABEL DESCRIPTION
Show Filter/Hide FilterClick Show Filter to display IPv4 and IPv6 (if enabled) security policy search filters.
IPv4 / IPv6 ConfigurationUse IPv4 / IPv6 search filters to find specific IPv4 and IPv6 (if enabled) security policies based on direction, application, user, source, destination and/or schedule.
From / ToSelect a zone to view all security policies from a particular zone and/or to a particular zone.any means all zones.
Table 283 Configuration > Security Service > SSL Inspection > Action
LABELDESCRIPTION
IPv4 / IPv6 SourceType an IPv4 or IPv6 IP address to view all security policies based on the IPv4 / IPv6 source address object used.An IPv4 IP address is written as four integer blocks separated by periods. This is an example IPv4 address: 172.16.6.7.An 128-bit IPv6 address is written as eight 16-bit hexadecimal blocks separated by colons (:). This is an example IPv6 address: 2001:0db8:1a2b:0015:0000:0000:1a2f:0000.
IPv4 / IPv6 DestinationType an IPv4 or IPv6 IP address to view all security policies based on the IPv4 / IPv6 destination address object used.An IPv4 IP address is written as four integer blocks separated by periods. This is an example IPv4 address: 172.16.6.7.An 128-bit IPv6 address is written as eight 16-bit hexadecimal blocks separated by colons (:). This is an example IPv6 address: 2001:0db8:1a2b:0015:0000:0000;1a2f:0000.
Service View all security policies based the service object used.
User View all security policies based on user or user group object used.
Schedule View all security policies based on the schedule object used.
PriorityThis is the position of your Security Policy in the global policy list (including all through-Zyxel Device and to-Zyxel Device policies). The ordering of your policies is important as policies are applied in sequence.Default displays for the default Security Policy behavior that the Zyxel Device performs on traffic that does not match any other Security Policy.
Status This icon is lit when the entry is active and dimmed when the entry is inactive.
Name This is the name of the Security policy.
From / ToThis is the direction of travel of packets. Select from which zone the packets come and to which zone they go.Security Policies are grouped based on the direction of travel of packets to which they apply. For example, from LAN to LAN means packets traveling from a computer or subnet on the LAN to either another computer or subnet on the LAN.From any displays all the Security Policies for traffic going to the selected To Zone.To any displays all the Security Policies for traffic coming from the selected From Zone.From any to any displays all of the Security Policies.To ZyWALL policies are for traffic that is destined for the Zyxel Device and control which computers can manage the Zyxel Device.
IPv4 / IPv6 SourceThis displays the IPv4 / IPv6 source address object, including geographic address and FQDN (group) objects, to which this Security Policy applies.
IPv4 / IPv6 DestinationThis displays the IPv4 / IPv6 destination address object, including geographic address and FQDN (group) objects, to which this Security Policy applies.
ServiceThis displays the service object to which this Security Policy applies.
UserThis is the user name or user group name to which this Security Policy applies.
ScheduleThis field tells you the schedule object that the policy uses. none means the policy is active at all times if enabled.
ActionThis field displays whether the Security Policy silently discards packets without notification (deny), permits the passage of packets (allow) or drops packets with notification (reject)
LogSelect whether to have the Zyxel Device generate a log (log), log and alert (log alert) or not (no) when the policy is matched to the criteria listed above.
ProfileThis field shows you which Security Service profiles (application patrol, content filter, IDP, anti-malware, email security) apply to this Security policy. Click an applied Security Service profile icon to edit the profile directly.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving.

37.2.2 Add / Edit SSL Inspection Profiles

Click Configuration > Security Service > SSL Inspection > Profile > Add to create a new profile or select an existing profile and click Edit to change its settings. Figure 459 Configuration > Security Service > SSL Inspection > Profile > Add / Edit ![](images/cf1f236962222f6572338d6453da5d172989a4e3ef9b5a3ab1ca7ed5da546fd2.jpg) The following table describes the fields in this screen. Table 284 Configuration > Security Service > SSL Inspection > Profile > Add / Edit
LABEL DESCRIPTION
NameThis is the name of the profile. You may use 1-31 alphanumeric characters, underscores(_, or dashes (-), but the first character cannot be a number. This value is case-sensitive. These are valid, unique profile names:MyProfilemYProfileMymy12_3-4These are invalid profile names:1mYProfileMy ProfileMyProfile?Whatalongprofilename123456789012
DescriptionEnter additional information about this SSL Inspection entry. You can enter up to 60 characters ("0-9", "a-z", "A-Z", "-" and "_").
CA CertificateThis contains the default certificate and the certificates created inObject > Certificate > My Certificates.Choose the certificate for this profile.
SSL/TLS version supported minimumSSL / TLS connections using versions lower than this setting are blocked.
LogThese are the log options for unsupported traffic that matches traffic bound to this policy:no: Select this option to have the Zyxel Device create no log for unsupported traffic that matches traffic bound to this policy.log: Select this option to have the Zyxel Device create a log for unsupported traffic that matches traffic bound to this policy.log alert: An alert is an emailed log for more serious events that may need more immediate attention. They also appear in red in theMonitor > Logscreen. Select this option to have the Zyxel Device send an alert for unsupported traffic that matches traffic bound to this policy.
Action for Connection with unsupported suitSSL Inspection supports these cipher suites:DES3 D E SAESSelect topassor blockunsupported traffic (such as other cipher suites, compressed traffic, client authentication requests, and so on) that matches traffic bound to this policy here.
LogThese are the log options for unsupported traffic that matches traffic bound to this policy:no: Select this option to have the Zyxel Device create no log for unsupported traffic that matches traffic bound to this policy.log: Select this option to have the Zyxel Device create a log for unsupported traffic that matches traffic bound to this policylog alert: An alert is an emailed log for more serious events that may need more immediate attention. They also appear in red in theMonitor > Logscreen. Select this option to have the Zyxel Device send an alert for unsupported traffic that matches traffic bound to this policy.
Action for connection with untrusted cert chainA certificate chain is a certification process that involves the following certificates between the SSL/TLS server and a client. A certificate chain will fail if one of the following certificates is not correct.A certificate owned by a userThe certificate signed by a certification authorityA root certificateSelect topass, inspect, orblockan untrusted certification chain.
LogThese are the log options for unsupported traffic that matches traffic bound to this policy:no: Select this option to have the Zyxel Device create no log for unsupported traffic that matches traffic bound to this policy.log: Select this option to have the Zyxel Device create a log for unsupported traffic that matches traffic bound to this policylog alert: An alert is an emailed log for more serious events that may need more immediate attention. They also appear in red in theMonitor> Logscreen. Select this option to have the Zyxel Device send an alert for unsupported traffic that matches traffic bound to this policy.
OKClickOKto save your settings to the Zyxel Device, and return to the profile summary page.
CancelClickCancelto return to the profile summary page without saving any changes.

37.3 Exclude List Screen

There may be privacy and legality issues regarding inspecting a user's encrypted session. The legal issues may vary by locale, so it's important to check with your legal department to make sure that it's OK to intercept SSL traffic from your Zyxel Device users. To ensure individual privacy and meet legal requirements, you can configure an exclusion list to exclude matching sessions to destination servers. This traffic is not intercepted and is passed through uninspected. Click Configuration > Security Service > SSL Inspection > Exclude List to display the following screen. Use Add to put a new item in the list or Edit to change an existing one or Remove to delete an existing entry. Figure 460 Configuration > Security Service > SSL Inspection > Exclude List (> Add/Edit) ![](images/da79debc310a449beaed796556548b3fa845db5217b62a9d8e280daed20d0fe5.jpg) The following table describes the fields in this screen. Table 285 Configuration > Security Service > SSL Inspection > Exclude List
LABEL DESCRIPTION
General Settings
Enable Logs for Exclude ListClick this to create a log for traffic that bypasses SSL Inspection.
Exclude List SettingsUse this part of the screen to create, edit, or delete items in the SSL Inspection exclusion list.
Add Click this tocreate a new entry.
Edit Select an entry and click this to be able to modify it.
Remove Select an entry and click this to delete it.
# This is the entry's index number in the list.
Exclude List of Certificate IdentitySSL traffic to a server to be excluded from SSL Inspection is identified by its certificate. Identify the certificate in one of the following ways:The Common Name (CN) of the certificate. The common name of the certificate can be created in theObject > Certificate > My Certificatescreen.Type an IPv4 or IPv6 address. For example, type 192.168.1.35, or 2001:7300:3500::1Type an IPv4/IPv6 in CIDR notation. For example, type 192.168.1.1/24, or 2001:7300:3500::1/64Type an IPv4/IPv6 address range. For example, type 192.168.1.1-192.168.1.35, or 2001:7300:3500::1-2001:7300:3500::35Type an email address. For example, type abc@zyxel.com.twType a DNS name or a common name (wildcard char: '*', escape char; '\'). Use up to 127 case-insensitive characters (0-9a-zA-Z~!@#$%^&*()-_=+[]}{\|::',<>/?). '*' can be used as a wildcard to match any string. Use '\*' to indicate a single wildcard character.Alternatively, to automatically add an entry for existing SSL traffic to a destination server, go toMonitor > Security Statistics > SSL Inspection > Certificate Cache List, select an item and then clickAdd to Exclude List. The item will then appear here.
ApplyClickApplyto save your settings to the Zyxel Device.
ResetClickResetto return to the profile summary page without saving any changes.

37.4 Certificate Update Screen

Use this screen to update the latest certificates of servers using SSL connections to the Zyxel Device network. User U sends an SSL request to destination server D (1), via the Zyxel Device, Z. D replies (2); Z intercepts the response from D and checks if the certificate has been previously signed. Z then replies to D (3) and also to U (4). D's latest certificate is stored at myZyxel (M) along with other server certificates and can be downloaded to the Zyxel Device. Figure 461 SSL Inspection Certificate Update Overview ![](images/6ac37d77559f0cc0405c26990e6d3ce92ff3f8306047dc6bd0317565e1446c22.jpg)
flowchart
graph TD
    U["Computer U"] -->|1| Server["Server"]
    Server -->|2| D["Server"]
    Server -->|3| D
    Server -->|4| U
    Server -->|Z| M["Server"]
Click Configuration > Security Service > SSL Inspection > Certificate Update to display the following screen. Figure 462 Configuration > Security Service > SSL Inspection > Certificate Update ![](images/2b0885e169f60eb425f87aa6f85711d85d117d5dd716d3ff4fb162592fdaa99c.jpg) The following table describes the fields in this screen. Table 286 Configuration > Security Service > SSL Inspection > Certificate Update
LABEL DESCRIPTION
Certificate Information
Current Version This displays the current certificate set version.
Released DateThis field displays the date and time the current certificate set was released.
Certificate UpdateYou should have Internet access and have activated SSL Inspection on the Zyxel Device at myZyxel.
Update NowClick this button to download the latest certificate set (Windows, MAC OS X, and Android) from the myZyxel and update it on the Zyxel Device.
Auto UpdateSelect this to automatically have the Zyxel Device update the certificate set when a new one becomes available on myZyxel.
ApplyClick Apply to save your settings to the Zyxel Device.
ResetClick Reset to return to the profile summary page without saving any changes.

37.5 Install a CA Certificate in a Browser

Certificates used in SSL Inspection profiles should be installed in user web browsers. Do the following steps to install a certificate in a computer with a Windows operating system (PC). First, save the certificate to your computer. 1 Run the certificate manager using certmgr.msc. ![](images/0da0d576170446a3a0164b00125a5334e30763f31256ba062f277ffb446d7f0b.jpg) 2 Go to Trusted Root Certification Authorities > Certificates. ![](images/5f86141d795e04907252e6ee6ef5d30df716a47f319b004ed12dcb321ad86ada.jpg) 3 From the main menu, select Action > All Tasks > Import and run the Certificate Import Wizard to install the certificate on the PC. ![](images/b65abe5ca5136cc31adeef65f36ca9dc4ebafcae22a8db89eda1d097891665c2.jpg)

37.5.0.1 Firefox Browser

If you're using a Firefox browser, in addition to the above you need to do the following to import a certificate into the browser. Click Tools > Options > Advanced > Encryption > View Certificates, click Import and enter the filename of the certificate you want to import. See the browser's help for further information.

CHAPTER 38 IP Exception

38.1 Overview

IP Exception allows incoming IP packets to bypass specific security services based on the packet's source or destination address. Bypassing a security service means the security service does not intercept nor inspect the packet. IP Exception supports bypassing the following security services: • Anti-Malware - URL Threat Filter • IDP (Intrusion Detection and Prevention)

38.2 The IP Exception Screen

Use this screen to view the IP exception list for the specified services. The Zyxel Device will not inspect incoming packets that match the listed source and destination IP address(es) with the specified services. Click Configuration > Security Service > IP Exception to display the following screen. Use Add to put a new entry in the list or Edit to change an existing one or Remove to delete an existing entry. Figure 463 Configuration > Security Service > IP Exception ![](images/de247a7845dcc424109357f085c1db18071aa3013a54575e1889f59413e8a188.jpg) The following table describes the fields in this screen. Table 287 Configuration > Security Service > IP Exception
LABEL DESCRIPTIONN
IPv4/IPv6 Exception List Settings
Add Click this to create a new entry.
Edit Select an entry and click this to be able to modify it.
Remove Select an entry and click this to delete it.
# This is the entry's index number in the list.
Name This field displays the descriptive name of this entry.
IPv4/IPv6 SourceThis field displays the source IP address (or address object) of incoming traffic. It displays any if there is no restriction on the source IP address.
IPv4/IPv6 DestinationThis field displays the destination IP address (or address object) of incoming traffic. It displays any if there is no restriction on the destination IP address.
Service to Bypass This field displays which services will not inspect matched packets.
LogThis field displays if the Zyxel Device will generate a log when the incoming traffic is in the exception list.

38.2.1 The IP Exception Add/Edit Screen

Use this screen to add or edit entries of IPv4 or IPv6 address in the IP exception list. Click Configuration > Security Service > IP Exception > Add/Edit to display the following screen. Figure 464 Configuration > Security Service > IP Exception > Add/Edit ![](images/4b37d9fde689fcf564ded992b316a904fae5234fc8622b3bb46fd542980eca83.jpg) The following table describes the fields in this screen. Table 288 Configuration > Security Service > IP Exception > Add/Edit
LABEL DESCRIPTION
Create New ObjectUse this to configure any new settings objects that you need to use in this screen.
Name Enter a descriptive name of this entry.
DescriptionEnter the description for this entry. You can use up to 60 printable ASCII characters.
SourceSelect any or an address object of the source IP address for this entry. Select any so there's no restriction on the source IP address.
DestinationSelect any or an address object of the destination IP address for this entry. Select any so there's no restriction on the destination IP address.
LogSelect Yes to have the Zyxel Device generate a log when the incoming traffic is in the exception list. Otherwise, select No.
Service to BypassSelected services do not inspect packets that match source/destination criteria above. Non-selected services do inspect packets that match source/destination criteria above.
OKClick OK to save your customized settings and exit this screen.
CancelClick Cancel to exit this screen without saving.

CHAPTER 39 Object

39.1 Zones Overview

Set up zones to configure network security and network policies in the Zyxel Device. A zone is a group of interfaces and/or VPN tunnels. The Zyxel Device uses zones instead of interfaces in many security and policy settings, such as Secure Policies rules, Security Service, and remote management. Zones cannot overlap. Each Ethernet interface, VLAN interface, bridge interface, PPPoE/PPTP interface and VPN tunnel can be assigned to at most one zone. Virtual interfaces are automatically assigned to the same zone as the interface on which they run. Figure 465 Example: Zones ![](images/e1c10a5e8befe276c837c135f9d5f73b054cc41404eebcf79211e2caa1580261.jpg)
flowchart
graph TD
    subgraph LAN1
        A["VLAN 1"] --> B["Network"]
        C["VLAN 2"] --> D["Network"]
        E["Ethernet"] --> F["Network"]
    end

    subgraph LAN2
        G["VLAN 1"] --> H["Network"]
        I["VLAN 2"] --> J["Network"]
        K["Ethernet"] --> L["Network"]
    end

    subgraph DMZ
        M["VLAN 1"] --> N["Network"]
        O["VLAN 2"] --> P["Network"]
        Q["Ethernet"] --> R["Network"]
    end

    subgraph WAN
        S["VAN 1"] --> T["ISP"]
        U["VAN 2"] --> V["ISP"]
        W["WAN"] --> X["ISP"]
        Y["Internet"] --> Z["ISP"]
    end

    style LAN1 fill:#f9f,stroke:#333
    style LAN2 fill:#f9f,stroke:#333
    style DMZ fill:#ff9,stroke:#333
    style WAN fill:#ccf,stroke:#333
    style Internet fill:#cfc,stroke:#333
Use the Zone screens (see Section 39.8.2 on page 780) to manage the Zyxel Device's zones.

39.1.1 What You Need to Know

Zones effectively divide traffic into three types--intra-zone traffic, inter-zone traffic, and extra-zone traffic.

Intra-zone Traffic

\- Intra-zone traffic is traffic between interfaces or VPN tunnels in the same zone. For example, in Figure 465 on page 710, traffic between VLAN 2 and the Ethernet is intra-zone traffic.

Inter-zone Traffic

Inter-zone traffic is traffic between interfaces or VPN tunnels in different zones. For example, in Figure 465 on page 710, traffic between VLAN 1 and the Internet is inter-zone traffic. This is the normal case when zone-based security and policy settings apply.

Extra-zone Traffic

- Extra-zone traffic is traffic to or from any interface or VPN tunnel that is not assigned to a zone. For example, in Figure 465 on page 710, traffic to or from computer C is extra-zone traffic. - Some zone-based security and policy settings may apply to extra-zone traffic, especially if you can set the zone attribute in them to Any or All. See the specific feature for more information.

39.1.2 The Zone Screen

The Zone screen provides a summary of all zones. In addition, this screen allows you to add, edit, and remove zones. To access this screen, click Configuration > Object > Zone. Figure 466 Configuration > Object > Zone ![](images/b682085e62985145ed7a84e83f8851c55f62852dc567a0acc55d3675ffc81eef.jpg) The following table describes the labels in this screen. Table 289 Configuration > Object > Zone
LABEL DESCRIPTION
User Configuration / System DefaultThe Zyxel Device comes with pre-configuredSystem Defaultzones that you cannot delete. You can create your ownUser Configurationzones
Add Click this to create anew, user-configured zone.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove a user-configured trunk, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry. Click Refresh to update information in this screen.
# This field is a sequential value, and it is not associated with any interface.
Name This field displays the name of the zone.
MemberThis field displays the names of the interfaces that belong to each zone.
ReferenceThis field displays the number of times an Object Reference is used in a policy.

39.1.2.1 Zone Edit

The Zone Edit screen allows you to add or edit a zone. To access this screen, go to the Zone screen (see Section 39.8.2 on page 780), and click the Add icon or an Edit icon. Figure 467 Configuration > Object > Zone > Add ![](images/58351ffb6300982b05fc5c356e9ccf7a6ce3ee616783ccbbf8e1ad1498fcdda5.jpg) The following table describes the labels in this screen. Table 290 Configuration > Object > Zone > Add/Edit
LABEL DESCRIPTION
Name For a system deault zone, the name is read only.For a user-configured zone, type the name used to refer to the zone. You may use 1-31 alphanumeric characters, underscores ( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive.
Member ListAvailablelists the interfaces and VPN tunnels that do not belong to any zone. Select the interfaces and VPN tunnels that you want to add to the zone you are editing, and click the right arrow button to add them.Memberlists the interfaces and VPN tunnels that belong to the zone. Select any interfaces that you want to remove from the zone, and click the left arrow button to remove them.
LABEL DESCRIPTION
OKClick OK to save your customized settings and exit this screen.
CancelClick Cancel to exit this screen without saving.

39.2 User/Group Overview

This section describes how to set up user accounts, user groups, and user settings for the Zyxel Device. You can also set up rules that control when users have to log in to the Zyxel Device before the Zyxel Device routes traffic for them. - The User screen (see Section 39.13.1 on page 822) provides a summary of all user accounts. - The Group screen (see Section 39.2.5 on page 722) provides a summary of all user groups. In addition, this screen allows you to add, edit, and remove user groups. User groups may consist of access users and other user groups. You cannot put admin users in user groups. - The Setting screen (see Section 39.2.6 on page 724) controls default settings, login settings, lockout settings, and other user settings for the Zyxel Device. You can also use this screen to specify when users must log in to the Zyxel Device before it routes traffic for them. - The MAC Address screen (see Section 39.2.7 on page 729) allows you to configure the MAC addresses or OUI (Organizationally Unique Identifier) of wireless clients for MAC authentication using the local user database. The OUI is the first three octets in a MAC address and uniquely identifies the manufacturer of a network device.

39.2.1 What You Need To Know

User Account

A user account defines the privileges of a user logged into the Zyxel Device. User accounts are used in security policies and application patrol, in addition to controlling access to configuration and services in the Zyxel Device.

User Types

These are the types of user accounts the Zyxel Device uses. Table 291 Types of User Accounts
TYPE ABILITIESLOGIN METHOD(S)
Admin Users
adminChange Zyxel Device configuration (web, CLI)WWW, TELNET, SSH, FTP, Console
limited-admin Lookat Zyxel Device configuration (web, CLI)Perform basic diagnostics (CLI)WWW, TELNET, SSH, Console
Access Users
user Access network servicesBrowse user-mode commands (CLI)WWW, TELNET, SSH
guest Access network services WWW
ext-user External user accountWWW
Table 291 Types of User Accounts (continued)
TYPE ABILITIES LOGIN METHOD(S)
ext-group-user External group user account WWW
guest-manager Create dynamic guest accounts WWW
dynamic-guest Access network services Hotspot Portal
Note: The default admin account is always authenticated locally, regardless of the authentication method setting. (See Chapter 39 on page 794 for more information about authentication methods.)

Ext-User Accounts

Set up an ext-user account if the user is authenticated by an external server and you want to set up specific policies for this user in the Zyxel Device. If you do not want to set up policies for this user, you do not have to set up an ext-user account. All ext-user users should be authenticated by an external server, such as AD, LDAP or RADIUS. If the Zyxel Device tries to use the local database to authenticate an ext-user, the authentication attempt always fails. (This is related to AAA servers and authentication methods, which are discussed in those chapters in this guide.) Note: If the Zyxel Device tries to authenticate an ext-user using the local database, the attempt always fails. Once an ext-user user has been authenticated, the Zyxel Device tries to get the user type (see Table 291 on page 713) from the external server. If the external server does not have the information, the Zyxel Device sets the user type for this session to User. For the rest of the user attributes, such as reauthentication time, the Zyxel Device checks the following places, in order. 1 User account in the remote server. 2 User account (Ext-User) in the Zyxel Device. 3 Default user account for AD users (ad-users), LDAP users (ldap-users) or RADIUS users (radius-users) in the Zyxel Device. See Setting up User Attributes in an External Server for a list of attributes and how to set up the attributes in an external server.

Ext-Group-User Accounts

Ext-Group-User accounts work are similar to ext-user accounts but allow you to group users by the value of the group membership attribute configured for the AD or LDAP server. See Section 39.9.5.1 on page 788 for more on the group membership attribute.

Dynamic-Guest Accounts

Dynamic guest accounts are guest accounts, but are created dynamically and stored in the Zyxel Device's local user database. A dynamic guest account has a dynamically-created user name and password. A dynamic guest account user can access the Zyxel Device's services only within a given period of time and will become invalid after the expiration date/time. There are three types of dynamic guest accounts depending on how they are created or authenticated: billing-users, ua-users and trial-users. billing-users are guest account created with the guest manager account or an external printer and paid by cash or created and paid via the on-line payment service. ua-users are users that log in from the user agreement page. trial-users are free guest accounts that are created with the Free Time function.

User Groups

User groups may consist of user accounts or other user groups. Use user groups when you want to create the same rule for several user accounts, instead of creating separate rules for each one. Note: You cannot put access users and admin users in the same user group. Note: You cannot put the default admin account into any user group. The sequence of members in a user group is not important.

User Awareness

By default, users do not have to log into the Zyxel Device to use the network services it provides. The Zyxel Device automatically routes packets for everyone. If you want to restrict network services that certain users can use via the Zyxel Device, you can require them to log in to the Zyxel Device first. The Zyxel Device is then 'aware' of the user who is logged in and you can create 'user-aware policies' that define what services they can use. See Section 39.2.8 on page 731 for a user-aware login example.

Finding Out More

- See Section 39.2.8 on page 731 for some information on users who use an external authentication server in order to log in. - The Zyxel Device supports TTLS using PAP so you can use the Zyxel Device's local user database to authenticate users with WPA or WPA2 instead of needing an external RADIUS server.

39.2.2 User/Group User Summary Screen

The User screen provides a summary of all user accounts. To access this screen, login to the Web Configurator, and click Configuration > Object > User/Group. Figure 468 Configuration > Object > User/Group > User ![](images/92eb7d907c420b84d9c77b5bafbe4f1b8c3aefdc99b6943a12270fe9b562d681.jpg) The following table describes the labels in this screen. Table 292 Configuration > Object > User/Group > User
LABEL DESCRIPTION
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry.
# This field is a sequential value, and it is not associated with a specific user.
User Name This field displays the user name of each user.
User TypeThis field displays the types of user accounts the Zyxel Device uses:admin- this user can look at and change the configuration of the Zyxel Devicelimited-admin- this user can look at the configuration of the Zyxel Device but not to change itdynamic-guest- this user has access to the Zyxel Device's services but cannot look at the configuration.user- this user has access to the Zyxel Device's services and can also browse user-mode commands (CLI).guest- this user has access to the Zyxel Device's services but cannot look at the configurationext-user- this user account is maintained in a remote server, such as RADIUS or LDAP. See Ext-User Accounts on page 714 for more information about this type.ext-group-user- this user account is maintained in a remote server, such as RADIUS or LDAP. See Ext-Group-User Accounts on page 714 for more information about this type.guest-manager- this user can log in via the web configurator login screen and create dynamic guest accounts using the Account Generator screen that pops up.
Description This field displays the description for each user.
Reference This displays the number of times an object reference is used in a profile.

39.2.3 User Add/Edit General Screen

The User Add/Edit General screen allows you to create a new user account or edit an existing one.

39.2.3.1 Rules for User Names

Enter a user name from 1 to 31 characters. The user name can only contain the following characters: - Alphanumeric A-z 0-9 (there is no unicode support) - \_ [underscores] - [dashes] The first character must be alphabetical (A-Z a-z), an underscore (\_), or a dash (-). Other limitations on user names are: - User names are case-sensitive. If you enter a user 'bob' but use 'BOB' when connecting via CIFS or FTP, it will use the account settings used for 'BOB' not 'bob'. - User names have to be different than user group names. • Here are the reserved user names: ![](images/b54535c34942d8697f05b7fca6067c3bc5d081ce67c33aa0877ee49a0b00c29e.jpg) To access this screen, go to the User screen (see Section 39.13.1 on page 822), and click either the Add icon or an Edit icon. Figure 469 Configuration > Object > User/Group > User > Add/Edit\_General ![](images/32c4497439faba48f8cd764dbed9c0ee4863f5d63dad4bfe382582cb103e294c.jpg) The following table describes the labels in this screen. Table 293 Configuration > Object > User/Group > User > Add/Edit\_General
LABEL DESCRIPTION
User NameType the user name for this user account. You may use 1-31 alphanumeric characters, underscores( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive. User names have to be different than user group names, and some words are reserved. See Section 39.2.3.1 on page 716.
User TypeThis field displays the types of user accounts the Zyxel Device uses:admin- this user can look at and change the configuration of the Zyxel Devicelimited-admin- this user can look at the configuration of the Zyxel Device but not to change ituser- this user has access to the Zyxel Device's services and can also browse user-mode commands (CLI).guest- this user has access to the Zyxel Device's services but cannot look at the configuration.ext-user- this user account is maintained in a remote server, such as RADIUS or LDAP.See Ext-User Accounts on page 714 for more information about this type.ext-group-user- this user account is maintained in a remote server, such as RADIUS or LDAP. See Ext-Group-User Accounts on page 714 for more information about this type.
PasswordThis field is not available if you select theext-userorext-group-usertype.Enter a password of from 1 to 64 characters for this user account. If you selectedEnable Password ComplexityinConfiguration>Object>User/Group>Setting, it must consist of at least 8 characters and at most 64. At least 1 character must be a number, at least 1 a lower case letter, at least 1 an upper case letter and at least 1 a special character from the keyboard, such as !@#$%^&*()_.+
RetypeThis field is not available if you select theext-userorext-group-usertype.
Group IdentifierThis field is available for aext-group-usertype user account.Specify the value of the AD or LDAP server'sGroup Membership Attributethat identifies the group to which this user belongs.
Associated AAA Server ObjectThis field is available for aext-group-usertype user account. Select the AAA server to use to authenticate this account's users.
DescriptionEnter the description of each user, if any. You can use up to 60 printable ASCII characters. Default descriptions are provided.
EmailType one or more valid email addresses for this user so that email messages can be sent to this user if required. A valid email address must contain the @ character. For example, this is a valid email address: abc@example.com.
Mobile NumberType a valid mobile telephone number for this user so that SMS messages can be sent to this user if required. A valid mobile telephone number can be up to 20 characters in length, including the numbers 1~9 and the following characters in the square brackets [+*#()-].
Send CodeThis button is available when the user type isadminorlimited-admin.Click this and an authorization email or SMS message with a code of six digits will be sent to the email addresses or mobile telephone number you put in.Enter the verification code to verify your email addresses or mobile telephone number.Figure 470Verification Code for EmailZYXEL USGFLEX700-GB0101F - Rules for User Names - 1Figure 471Verification Code for Mobile Telephone NumberZYXEL USGFLEX700-GB0101F - Rules for User Names - 2
AuthenticationTimeout SettingsIf you want the system to use default settings, selectUse Default Settings. If you want to set authentication timeout to a value other than the default settings, selectUse Manual Settings then fill your preferred values in the fields that follow.
Lease TimeIf you selectUse Default Settingsin the Authentication Timeout Settingsfield, the default lease time is shown.If you selectUse Manual Settings, you need to enter the number of minutes this user has to renew the current session before the user is logged out. You can specify 1 to 1440 minutes. You can enter 0 to make the number of minutes unlimited. Admin users renew the session every time the main screen refreshes in the Web Configurator. Access users can renew the session by clicking therenewbutton on their screen. If you allow access users to renew time automatically (seeSection 39.2.6 on page 724), the users can select this check box on their screen as well. In this case, the session is automatically renewed before the lease time expires.
ReauthenticationTimeIf you selectUse Default Settingsin the Authentication Timeout Settingsfield, the default lease time is shown.If you selectUse Manual Settings, you need to type the number of minutes this user can be logged into the Zyxel Device in one session before the user has to log in again. You can specify 1 to 1440 minutes. You can enter 0 to make the number of minutes unlimited. UnlikeLeasetime, the user has no opportunity to renew the session without logging out.
User VLAN IDThis field is available for aext-group-usertype user account.Select this option to enable dynamic VLAN assignment on the Zyxel Device. When a user is authenticated successfully, all data traffic from this user is tagged with the VLAN ID number you specify here.This allows you to assign a user of theext-group-usertype to a specific VLAN based on the user credentials instead of using an AAA server.
Configuration ValidationUse a user account from the group specified above to test if the configuration is correct.Enter the account's user name in theUser Namefield and click Test.
OKClick OKto save your changes back to the Zyxel Device and close the screen.
CancelClick Cancelto exit this screen without saving your changes.
SaveThis button is only available when adding a new user. Click Save to save your changes back to the Zyxel Device and then go to theTwo-factor Authenticationscreen.

39.2.4 User Add/Edit Two-factor Authentication Screen

The User Add/Edit Two-factor Authentication screen allows you to create two-factor security for VPN access or admin access for this user to the Zyxel Device. Two-factor authentication adds an extra layer of security for users logging into the Zyxel Device. When two-factor authentication is enabled, a user has to first enter their username and password, and then click on a temporary link or enter a one-time password when logging in. You can enable two-factor authentication for users who are logging into the Zyxel Device to create a VPN tunnel (VPN access), and for administrator and limited admin users who are logging into the Web Configurator or CLI (admin access) to configure the Zyxel Device. Table 294 Two Factor Authentication Methods
ACCESS TYPE TWO-FACTOR AUTHENTICATION METHODS FACTOR 2 PASSWORD
VPN SMS Code
VPN Email Link
Admin SMS Code
Admin Email Link
Admin Google Authenticator app Code
You must first enable two-factor authentication on the Zyxel Device in Object > Auth. Method > Two-factor Authentication > VPN Access and Object > Auth. Method > Two-factor Authentication > Admin Access. See Section 39.10.4 on page 797 and Section 39.10.6 on page 801 for more prerequisites and other information. In Object > User/Group > User, click Add to create a new entry or select an entry and click Edit to modify the entry. Figure 472 Configuration > Object > User/Group > User > Add/Edit\_Two-factor Authentication ![](images/da7b2bbbca75c3fa124c6748c237077da644e92afe10181f0e4bb95f7a1e7cca.jpg) Figure 473 Configuration > Object > User/Group > User > Add/Edit\_Two-factor Authentication\_Verified ![](images/cb7915c2ac473530b285fa4c90fe16cf263d381a2425cc46df6c5cb5c632ddc8.jpg) The following table describes the labels in this screen. Table 295 Configuration > Object > User/Group > User > Add\_Two-factor Authentication
LABEL DESCRIPTION
Enable Two-factor Authentication for VPN Access.Select this to require two-factor authentication for this user to use a pre-configured VPN tunnel for secure access to a network behind the Zyxel Device. Select the types of VPN allowed in Object > Auth. Method > Two-factor Authentication > VPN Access. You may choose from:SSL VPN AccessIPSec VPN AccessL2TP/IPSec VPN Access.
Enable Two-factor Authentication for Admin Access.Select this to require two-factor authentication for an admin user to access the Zyxel Device. Select the types of access allowed in Object > Auth. Method > Two-factor Authentication > Admin Access. You may choose from:WebSSHTELNET
Two-factor Auth. MethodSelect Default or User Defined and select from PIN code by SMS/Email or Google Authenticator
Set up Google AuthenticatorIf you chose Google Authenticator for offline two-factor authentication, on your mobile device, go to an app store to download Google Authenticator. To add your account to Google Authenticator, press the plus (+) icon, select Scan Barcode, then use your mobile device's camera to scan the barcode. Finally enter the verification code you receive on your mobile device in Verify your device.
View your backup codesYou see this after successful Google authentication. In the event that you do not have access to email or your mobile device, click Download to create backup codes as second-factor authentication. Make sure to put them in a safe place.
Verify your deviceIn the event that you do not have access to email or your mobile device, enter a backup code here as second factor authentication. You can use each code only once. If you generate a new set of backup codes (Regenerate backup codes), the old set become obsolete.
RevokeClick this to cancel Google authentication as second-factor authentication for Admin Access. You must then use a PIN code by SMS or email as second-factor authentication instead.
OKClick OK to save your changes back to the Zyxel Device and close the screen.
CancelClick Cancel to exit this screen without saving your changes.

39.2.5 User/ Group Group Summary Screen

User groups consist of access users and other user groups. You cannot put admin users in user groups. The Group screen provides a summary of all user groups. In addition, this screen allows you to add, edit, and remove user groups. To access this screen, login to the Web Configurator, and click Configuration > Object > User/Group > Group. Figure 474 Configuration > Object > User/Group > Group ![](images/e2f277ab535272cf2744c077c44ec3e24d5be4ad6fad69730a94e8abc51eb0ea.jpg) The following table describes the labels in this screen. See Section 39.2.5.1 on page 723 for more information as well. Table 296 Configuration > Object > User/Group > Group
LABEL DESCRIPTION
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so. Removing a group does not remove the user accounts in the group.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry.
# This field is a sequential value, and it is not associated with a specific user group.
Group Name This field displays the name of each user group.
Description This field displays the description for each user group.
MemberThis field lists the members in the user group. Each member is separated by a comma.
Reference This displays the number of times an object reference is used in a profile.

39.2.5.1 Group Add/Edit Screen

The Group Add/Edit screen allows you to create a new user group or edit an existing one. To access this screen, go to the Group screen (see Section 39.2.5 on page 722), and click either the Add icon or an Edit icon. Figure 475 Configuration > Object > User/Group > Group > Add ![](images/f097cac49205505df49928bc24ebf88122f6e23aba0539063963c43e6fbb2e76.jpg) The following table describes the labels in this screen. Table 297 Configuration > Object > User/Group > Group > Add
LABEL DESCRIPTION
Name Type the name for this user group. You may use 1-31 alphanumeric characters, underscores( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive. User group names have to be different than user names.
DescriptionEnter the description of the user group, if any. You can use up to 60 characters, punctuation marks, and spaces.
Member ListThe Member list displays the names of the users and user groups that have been added to the user group. The order of members is not important. Select users and groups from the Available list that you want to be members of this group and move them to the Member list. You can double-click a single entry to move it or use the [Shift] or [Ctrl] key to select multiple entries and use the arrow button to move them.Move any members you do not want included to the Available list.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving your changes.

39.2.6 User/Group Setting Screen

The Setting screen controls default settings, login settings, lockout settings, and other user settings for the Zyxel Device. You can also use this screen to specify when users must log in to the Zyxel Device before it routes traffic for them. To access this screen, login to the Web Configurator, and click Configuration > Object > User/Group > Setting. Figure 476 Configuration > Object > User/Group > Setting ![](images/ca9e535e7100eb5ec6d24311ca743c428bcf886ac5af62485795676d50a50ead.jpg) The following table describes the labels in this screen. Table 298 Configuration > Object > User/Group > Setting
LABEL DESCRIPTION
User Authentication Timeout Settings
Default Authentication Timeout SettingsThese authentication timeout settings are used by default when you create a new user account. They also control the settings for any existing user accounts that are set to use the default settings. You can still manually configure any user account's authentication timeout settings.
Edit#Double-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.This field is a sequential value, and it is not associated with a specific entry.
User Type These are the kinds of user account the Zyxel Device supports.admin- this user can look at and change the configuration of the Zyxel Devicelimited-admin- this user can look at the configuration of the Zyxel Device but not to change ituser- this user has access to the Zyxel Device's services but cannot look at the configurationguest- this user has access to the Zyxel Device's services but cannot look at the configurationext-user- this user account is maintained in a remote server, such as RADIUS or LDAP. SeeExt-User Accounts on page 714for more information about this type.ext-group-user- this user account is maintained in a remote server, such as RADIUS or LDAP. SeeExt-Group-User Accounts on page 714for more information about this type.
Lease TimeThis is the default lease time in minutes for each type of user account. It defines the number of minutes the user has to renew the current session before the user is logged out.Admin users renew the session every time the main screen refreshes in the Web Configurator. Access users can renew the session by clicking theRenewbutton on their screen. If you allow access users to renew time automatically (see Section 39.2.6 on page 724), the users can select this check box on their screen as well. In this case, the session is automatically renewed before the lease time expires.
Reauthentication TimeThis is the default reauthentication time in minutes for each type of user account. It defines the number of minutes the user can be logged into the Zyxel Device in one session before having to log in again. UnlikeLease Time, the user has no opportunity to renew the session without logging out.
Miscellaneous Settings
Allow renewing lease time automaticallySelect this check box if access users can renew lease time automatically, as well as manually, simply by selecting theUpdating lease time automaticallycheck box on their screen.
Enable user idle detection This is applicable for access users.Select this check box if you want the Zyxel Device to monitor how long each access user is logged in and idle (in other words, there is no traffic for this access user). The Zyxel Device automatically logs out the access user once theUser idle timeouthas been reached.
User idle timeout This is applicable for access users.This field is effective whenEnable user idle detectionis checked. Type the number of minutes each access user can be logged in and idle before the Zyxel Device automatically logs out the access user.
Login Security
Password must changed every (days):Enter how often users must change their password when they log into the Zyxel Device. You can choose from once a day to once a year.
Password reset link (FQDN/IP):Associate the password expiration to a specific Zyxel Device.Defaultis this Zyxel Device (myrouter) or selectCustomand enter the IP address or Fully Qualified Domain Name (FQDN).
Enable Password ComplexitySelect this to enforce the following conditions in a user password. Requiring a strong password is good for security. The conditions are that the password must consist of at least 8 characters and at most 64. At least 1 character must be a number, at least 1 a lower case letter, at least 1 an upper case letter and at least 1 a special character from the keyboard, such as !@#$%^&*()_.+
User Logon Settings
Limit the number of simultaneous logons for administration accountSelect this check box if you want to set a limit on the number of simultaneous logins by admin users. If you do not select this, admin users can login as many times as they want at the same time using the same or different IP addresses.
Maximum number per administration accountThis field is effective when Limit ... for administration account is checked. Type the maximum number of simultaneous logins by each admin user.
Limit the number of simultaneous logons for access accountSelect this check box if you want to set a limit on the number of simultaneous logins by non-admin users. If you do not select this, access users can login as many times as they want as long as they use different IP addresses.
Maximum number per access accountThis field is effective when Limit ... for access account is checked. Type the maximum number of simultaneous logins by each access user.
User Lockout Settings
Enable logon retry limitSelect this check box to set a limit on the number of times each user can login unsuccessfully (for example, wrong password) before the IP address is locked out for a specified amount of time.
Maximum retry countThis field is effective when Enable logon retry limit is checked. Type the maximum number of times each user can login unsuccessfully before the IP address is locked out for the specified lockout period. The number must be between 1 and 99.
Lockout periodThis field is effective when Enable logon retry limit is checked. Type the number of minutes the user must wait to try to login again, if logon retry limit is enabled and the maximum retry count is reached. This number must be between 1 and 65,535 (about 45.5 days).
ApplyClick Apply to save the changes.
ResetClick Reset to return the screen to its last-saved settings.

39.2.6.1 Default User Authentication Timeout Settings Edit Screens

The Default Authentication Timeout Settings Edit screen allows you to set the default authentication timeout settings for the selected type of user account. These default authentication timeout settings also control the settings for any existing user accounts that are set to use the default settings. You can still manually configure any user account's authentication timeout settings. To access this screen, go to the Configuration > Object > User/Group > Setting screen (see Section 39.2.6 on page 724), and click one of the Default Authentication Timeout Settings section's Edit icons. Figure 477 Configuration > Object > User/Group > Setting > Edit ![](images/c3aff3942f1593fca17d2b2df41b95b4d49618fedebf2104059c23c3a9e3ccaf.jpg) The following table describes the labels in this screen. Table 299 Configuration > Object > User/Group > Setting > Edit
LABEL DESCRIPTION
User TypeThis read-only field identifies the type of user account for which you are configuring the default settings.admin- this user can look at and change the configuration of the Zyxel Devicelimited-admin- this user can look at the configuration of the Zyxel Device but not to change it.dynamic-guest- this user has access to the Zyxel Device's services but cannot look at the configuration.user- this user has access to the Zyxel Device's services but cannot look at the configuration.guest- this user has access to the Zyxel Device's services but cannot look at the configuration.ext-user- this user account is maintained in a remote server, such as RADIUS or LDAP. See Ext-User Accounts on page 714 for more information about this type.ext-group-user- this user account is maintained in a remote server, such as RADIUS or LDAP. See Ext-Group-User Accounts on page 714 for more information about this type.guest-manager- this user can log in via the web configurator login screen and create dynamic guest accounts using the Account Generator screen that pops up.
Lease TimeEnter the number of minutes this type of user account has to renew the current session before the user is logged out. You can specify 1 to 1440 minutes. You can enter 0 to make the number of minutes unlimited.Admin users renew the session every time the main screen refreshes in the Web Configurator. Access users can renew the session by clicking the Renew button on their screen. If you allow access users to renew time automatically (see Section 39.2.6 on page 724), the users can select this check box on their screen as well. In this case, the session is automatically renewed before the lease time expires.
Reauthentication TimeType the number of minutes this type of user account can be logged into the Zyxel Device in one session before the user has to log in again. You can specify 1 to 1440 minutes. You can enter 0 to make the number of minutes unlimited. Unlike Lease Time, the user has no opportunity to renew the session without logging out.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving your changes.

39.2.6.2 User Aware Login Example

Access users cannot use the Web Configurator to browse the configuration of the Zyxel Device. Instead, after access users log into the Zyxel Device, the following screen appears. Figure 478 Web Configurator for Non-Admin Users ![](images/263956f9c40beacc4082cc7bb7a8838e7d489e8502d8296f234f37ece491a772.jpg) The following table describes the labels in this screen. Table 300 Web Configurator for Non-Admin Users
LABEL DESCRIPTION
User-defined lease time (max ... minutes)Access users can specify a lease time shorter than or equal to the one that you specified. The default value is the lease time that you specified.
RenewAccess users can click this button to reset the lease time, the amount of time remaining before the Zyxel Device automatically logs them out. The Zyxel Device sets this amount of time according to the:User-defined lease time field in this screenLease time field in the User Add/ Edit screen (see Section 39.13.1.1 on page 823)Lease time field in the Setting screen (see Section 39.2.6 on page 724).
Updating lease time automaticallyThis box appears if you checked the Allow renewing lease time automatically box in the Setting screen. (See Section 39.2.6 on page 724.) Access users can select this check box to reset the lease time automatically 30 seconds before it expires. Otherwise, access users have to click the Renew button to reset the lease time.
Remaining time before lease timeoutThis field displays the amount of lease time that remains, though the user might be able to reset it.
Remaining time before auth. timeoutThis field displays the amount of time that remains before the Zyxel Device automatically logs the access user out, regardless of the lease time.

39.2.7 User/Group MAC Address Summary Screen

This screen shows the MAC addresses of wireless clients, which can be authenticated by their MAC addresses using the local user database. Click Configuration > Object > User/Group > MAC Address to open this screen. Note: You need to configure an SSID security profile's MAC authentication settings to have the AP use the Zyxel Device's local database to authenticate wireless clients by their MAC addresses. Figure 479 Configuration > Object > User/Group > MAC Address ![](images/71399d07cf0e09f0004f4d043ff9c30c25f06ef089f1fe18eed5ff676f0ee695.jpg) The following table describes the labels in this screen. Table 301 Configuration > Object > User/Group > MAC Address
LABEL DESCRIPTION
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
MAC Address/ OUIThis field displays the MAC address or OUI (Organizationally Unique Identifier of computer hardware manufacturers) of wireless clients using MAC authentication with the Zyxel Device local user database.
DescriptionThis field displays a description of the device identified by the MAC address or OUI.

39.2.7.1 MAC Address Add/Edit Screen

This screen allows you to create a new allowed device or edit an existing one. To access this screen, go to the MAC Address screen (see Section 39.2.7 on page 729), and click either the Add icon or an Edit icon. Figure 480 Configuration > Object > User/Group > MAC Address > Add ![](images/f8d9fa456b2050f66d6f90d05fadd0224f598aae5e5329420f729b09064c2248.jpg) The following table describes the labels in this screen. Table 302 Configuration > Object > User/Group > MAC Address > Add
LABEL DESCRIPTION
MAC Address/ OUIType the MAC address (six hexadecimal number pairs separated by colons or hyphens) or OUI (three hexadecimal number pairs separated by colons or hyphens) to identify specific wireless clients for MAC authentication using the Zyxel Device local user database. The OUI is the first three octets in a MAC address and uniquely identifies the manufacturer of a network device.
DescriptionEnter an optional description of the wireless device(s) identified by the MAC or OUI. You can use up to 60 characters, punctuation marks, and spaces.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving your changes.

39.2.8 User / Group Technical Reference

This section provides some information on users who use an external authentication server in order to log in.

Setting up User Attributes in an External Server

To set up user attributes, such as reauthentication time, in LDAP or RADIUS servers, use the following keywords in the user configuration file. Table 303 LDAP/RADIUS: Keywords for User Attributes
KEYWORD CORRESPONDING ATTRIBUTE IN WEB CONFIGURATOR
typeUser Type. Possible Values: admin, limited-admin, dynamic-guest, user, guest.
leaseTimeLease Time. Possible Values: 1-1440 (minutes).
reauthTimeReauthentication Time. Possible Values: 1-1440 (minutes).
The following examples show you how you might set up user attributes in LDAP and RADIUS servers. Figure 481 LDAP Example: Keywords for User Attributes
type: admin leaseTime: 99 reauthTime: 199
Figure 482 RADIUS Example: Keywords for User Attributes
type=user;leaseTime=222;reauthTime=222

Creating a Large Number of Ext-User Accounts

If you plan to create a large number of Ext-User accounts, you might use CLI commands, instead of the Web Configurator, to create the accounts. Extract the user names from the LDAP or RADIUS server, and create a shell script that creates the user accounts.

39.3 AP Profile Overview

This section shows you how to configure preset profiles for the Access Points (APs) connected to your Zyxel Device's wireless network. - The Radio screen (Section 39.3.1 on page 733) creates radio configurations that can be used by the APs. - The SSID screen (Section 39.3.2 on page 740) configures three different types of profiles for your networked APs.

39.3.0.1 What You Need To Know

The following terms and concepts may help as you read this section.

Wireless Profiles

At the heart of all wireless AP configurations on the Zyxel Device are profiles. A profile represents a group of saved settings that you can use across any number of connected APs. You can set up the following wireless profile types: - Radio - This profile type defines the properties of an AP's radio transmitter. You can have a maximum of 32 radio profiles on the Zyxel Device. - SSID - This profile type defines the properties of a single wireless network signal broadcast by an AP. Each radio on a single AP can broadcast up to 8 SSIDs. You can have a maximum of 32 SSID profiles on the Zyxel Device. - Security - This profile type defines the security settings used by a single SSID. It controls the encryption method required for a wireless client to associate itself with the SSID. You can have a maximum of 32 security profiles on the Zyxel Device. - MAC Filtering - This profile provides an additional layer of security for an SSID, allowing you to block access or allow access to that SSID based on wireless client MAC addresses. If a client's MAC address is on the list, then it is either allowed or denied, depending on how you set up the MAC Filter profile. You can have a maximum of 32 MAC filtering profiles on the Zyxel Device.

SSID

The SSID (Service Set IDentifier) is the name that identifies the Service Set with which a wireless station is associated. Wireless stations associating to the access point (AP) must have the same SSID. In other words, it is the name of the wireless network that clients use to connect to it.

WEP

WEP (Wired Equivalent Privacy) encryption scrambles all data packets transmitted between the AP and the wireless stations associated with it in order to keep network communications private. Both the wireless stations and the access points must use the same WEP key for data encryption and decryption.

WPA and WPA2

Wi-Fi Protected Access (WPA) is a subset of the IEEE 802.11i standard. WPA2 (IEEE 802.11i) is a wireless security standard that defines stronger encryption, authentication and key management than WPA. Key differences between WPA(2) and WEP are improved data encryption and user authentication.

IEEE 802.1x

The IEEE 802.1x standard outlines enhanced security methods for both the authentication of wireless stations and encryption key management. Authentication is done using an external RADIUS server.

WiFi6 / IEEE 802.11ax

WiFi6 is backwards compatible with IEEE 802.11a/b/g/n/ac and is most suitable in areas with a high concentration of users. WiFi6 devices support Target Wakeup Time (TWT) allowing them to automatically power down when they are inactive. The following table displays the comparison of the different WiFi standards. The maximum link rate is for reference under ideal conditions only. Table 304 WiFi Standards Comparison
WIFI STANDARDMAXIMUM LINK RATE *BANDSIMULTANEOUS CONNECTIONS
802.11b 11 Mbps 2.4 GHz 1
802.11a/g 54 Mbps 2.4 GHz and 5 GHz 1
802.11n 600 Mbps 2.4 GHz and 5 GHz 1
802.11ac 6.93 Gbps 5 GHz 4
802.11ax2.4 Gbps 2.4 GHz128
9.61 Gbps 5 GHz and 6 GHz

39.3.1 Radio Screen

This screen allows you to create radio profiles for the APs on your network. A radio profile is a list of settings that a supported managed AP (NWA5121-N for example) can use to configure either one of its two radio transmitters. To access this screen click Configuration > Object > AP Profile. Note: You can have a maximum of 32 radio profiles on the Zyxel Device. Figure 483 Configuration > Object > AP Profile > Radio ![](images/6116308cb1d54c62212e4773bf65af8ad350cf96484aeee23bdcc357ebe53d59.jpg) The following table describes the labels in this screen. Table 305 Configuration > Object > AP Profile > Radio
LABELDESCRIPTION
Add Click this to add a new radio profile.
EditClick this to edit the selected radio profile.
RemoveClick this to remove the selected radio profile.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
ReferencesClick this to view which other objects are linked to the selected radio profile.
#This field is a sequential value, and it is not associated with a specific profile.
StatusThis icon is lit when the entry is active and dimmed when the entry is inactive.
Profile NameThis field indicates the name assigned to the radio profile.
LABEL DESCRIPTION
Frequency BandThis field indicates the frequency band which this radio profile is configured to use.
ScheduleThis field displays the schedule object which defines when this radio profile can be used.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

39.3.1.1 Add/Edit Radio Profile

This screen allows you to create a new radio profile or edit an existing one. To access this screen, click the Add button or select a radio profile from the list and click the Edit button. Figure 484 Configuration > Object > AP Profile > Add/Edit Radio Profile ![](images/dd643d49507e97a44853d10db2bf6ebeb5bb8a7a41a6de2225ea0ebc6e474309.jpg) The following table describes the labels in this screen. Table 306 Configuration > Object > AP Profile > Add/Edit Radio Profile
LABEL DESCRIPTION
Hide / Show Advanced SettingsClick this to hide or show the Advanced Settings in this window.
Create New ObjectUse this to configure any new settings objects that you need to use in this screen.
General Settings
Activate Select thisoption to make this profile active.
Profile NameEnter up to 31 alphanumeric characters to be used as this profile's name. Spaces and underscores are allowed.
ScheduleThis field displays the schedule object which defines when this radio profile can be used.
802.11 Band Selecthow to let wireless clients connect to the AP.If 802.11 Band is set to 2.4G:11b/g: allows either IEEE 802.11b or IEEE 802.11g compliant WLAN devices to associate with the AP. The AP adjusts the transmission rate automatically according to the wireless standard supported by the wireless devices.11n: allows IEEE802.11b, IEEE802.11g and IEEE802.11n compliant WLAN devices to associate with the AP.If 802.11 Band is set to 5G:11a: allows only IEEE 802.11a compliant WLAN devices to associate with the AP.11a/n: allows both IEEE802.11n and IEEE802.11a compliant WLAN devices to associate with the AP. The transmission rate of your AP might be reduced.11ac: allows only IEEE802.11ac compliant WLAN devices to associate with the AP.11ax: allows IEEE802.11n, IEEE802.11a, IEEE802.11ac, and IEEE802.11ax compliant WLAN devices to associate with the AP. If the WLAN device isn't compatible with 802.11ax, the AP will communicate with the WLAN device using 802.11ac, and so onNote: If you select 11ac but the WLAN devices in the network do not support IEEE 802.11ac, the Zyxel Device automatically sets the AP to use 11a/n.
Channel WidthSelect the wireless channel bandwidth you want the AP to use.A standard 20 MHz channel offers transfer speeds of up to 144Mbps (2.4GHz) or 217Mbps (5GHz) whereas a 40MHz channel uses two standard channels and offers speeds of up to 300Mbps (2.4GHz) or 450Mbps (5GHz). An IEEE 802.11ac-specific 80MHz channel offers speeds of up to 1.3Gbps.40 MHz (channel bonding or dual channel) bonds two adjacent radio channels to increase throughput. A 80 MHz channel consists of two adjacent 40 MHz channels. The wireless clients must also support 40 MHz or 80 MHz. It is often better to use the 20 MHz setting in a location where the environment hinders the wireless signal.Because not all devices support 40 MHz and/or 80 MHz channels, select 20/40MHz or 20/40/80MHz to allow the AP to adjust the channel bandwidth automatically.Select 20MHz if you want to lessen radio interference with other wireless devices in your neighborhood or the wireless clients do not support channel bonding.Note: If the environment has poor signal-to-noise (SNR), the Zyxel Device will switch to a lower bandwidth.
Channel SelectionSelect the wireless channel which this radio profile should use.It is recommended that you choose the channel least in use by other APs in the region where this profile will be implemented. This will reduce the amount of interference between wireless clients and the AP to which this profile is assigned.SelectDCSto have the AP automatically select the radio channel upon which it broadcasts by scanning the area around it and determining what channels are currently being used by other devices.SelectManualand specify the channels the AP uses.
Blacklist DFS channels in presence of radarThis field is available if802.11Bandis set to5GandChannel Selectionis set toDCS.Enable this to temporarily blacklist the wireless channels in the Dynamic Frequency Selection (DFS) range whenever a radar signal is detected by the AP.
Enable DCS Client AwareThis field is available when you setChannel SelectiontoDCS.Select this to have the AP wait until all connected clients have disconnected before switching channels.If you disable this then the AP switches channels immediately regardless of any client connections. In this instance, clients that are connected to the AP when it switches channels are dropped.
2.4 GHz Channel Selection MethodThis field is available when you setChannel SelectiontoDCS.Selectautoto have the AP search for available channels automatically in the 2.4 GHz band. The available channels vary depending on what you select in the2.4 GHz Channel Deploymentfield.Selectmanualand specify the channels the AP uses in the 2.4 GHz band.
Channel IDThis field is available only when you setChannel SelectiontoDCSand set2.4 GHz Channel Selection Methodto manual.Select the check boxes of the channels that you want the AP to use.
Time IntervalSelect this option to have the AP survey the other APs within its broadcast radius at the end of the specified time interval.
2.4 GHz Channel DeploymentThis field is available only when you setChannel SelectiontoDCSand set2.4 GHz Channel Selection Methodto auto.SelectThree-Channel Deploymentto limit channel switching to channels 1,6, and 11, the three channels that are sufficiently attenuated to have almost no impact on one another. In other words, this allows you to minimize channel interference by limiting channel-hopping to these three “safe” channels.SelectFour-Channel Deploymentto limit channel switching to four channels. Depending on the country domain, if the only allowable channels are 1-11 then the Zyxel Device uses channels 1, 4, 7, 11 in this configuration; otherwise, the Zyxel Device uses channels 1, 5, 9, 13 in this configuration. Four channel deployment expands your pool of possible channels while keeping the channel interference to a minimum.Note: For US and Canada models, country code is fixed to US or Canada respectively and is not user selectable.
DCS Time IntervalThis field is available when you setChannel SelectiontoDCS.Enter a number of minutes. This regulates how often the AP surveys the other APs within its broadcast radius. If the channel on which it is currently broadcasting suddenly comes into use by another AP, the AP will then dynamically select the next available clean channel or a channel with lower interference.
Channel IDThis field is available only when you set Channel Selection to DCS and set 2.4 GHz Channel Selection Method to manual.Select the check boxes of the channels that you want the AP to use.
ScheduleSelect this option to have the AP survey the other APs within its broadcast radius at a specific time on selected days of the week.
Start TimeSpecify the time of the day (in 24-hour format) to have the AP use DCS to automatically scan and find a less-used channel.
Week DaysSelect each day of the week to have the AP use DCS to automatically scan and find a less-used channel.
Enable 5 GHz DFS AwareThis field is available only when you select 11a, 11a/n or 11ac in the 802.11 Band field.Select this if your APs are operating in an area known to have RADAR devices. This allows the device to downgrade its frequency to below 5 GHz in the event a RADAR signal is detected, thus preventing it from interfering with that signal.Enabling this forces the AP to select a non-DFS channel.
5 GHz Channel Selection MethodThis shows auto and allows the AP to search for available channels automatically in the 5 GHz band.
Advanced Settings
Country CodeSelect the country code of APs that are connected to the Zyxel Device to be the same as where the Zyxel Device is located/installed.The available channels vary depending on the country you select. Be sure to select the correct/same country for both radios on an AP and all connected APs, in order to prevent roaming failure and interference to other systems.Note: For US and Canada models, country code is fixed to US or Canada respectively and is not user selectable.
Guard IntervalThis field is available only when the 802.11 Band is set to 5G and 802.11 Mode is set to 11n or 11ac.Set the guard interval for this radio profile to either Short or Long.The guard interval is the gap introduced between data transmission from users in order to reduce interference. Reducing the interval increases data transfer rates but also increases interference. Increasing the interval reduces data transfer rates but also reduces interference.
Enable A-MPDU AggregationSelect this to enable A-MPDU aggregation.Message Protocol Data Unit (MPDU) aggregation collects Ethernet frames along with their 802.11n headers and wraps them in a 802.11n MAC header. This method is useful for increasing bandwidth throughput in environments that are prone to high error rates.
A-MPDU Limit Enterthe maximum frame size to be aggregated.
A-MPDU SubframeEnter the maximum number of frames to be aggregated each time.
Enable A-MSDU AggregationSelect this to enable A-MSDU aggregation.Mac Service Data Unit (MSDU) aggregation collects Ethernet frames without any of their 802.11n headers and wraps the header-less payload in a single 802.11n MAC header. This method is useful for increasing bandwidth throughput. It is also more efficient than A-MPDU except in environments that are prone to high error rates.
A-MSDU Limit Enterthe maximum frame size to be aggregated.
RTS/CTS ThresholdUse RTS/CTS to reduce data collisions on the wireless network if you have wireless clients that are associated with the same AP but out of range of one another. When enabled, a wireless client sends an RTS (Request To Send) and then waits for a CTS (Clear To Send) before it transmits. This stops wireless clients from transmitting packets at the same time (and causing data collisions).A wireless client sends an RTS for all packets larger than the number (of bytes) that you enter here. Set the RTS/CTS equal to or higher than the fragmentation threshold to turn RTS/CTS off.
Beacon IntervalWhen a wirelessly networked device sends a beacon, it includes with it a beacon interval. This specifies the time period before the device sends the beacon again. The interval tells receiving devices on the network how long they can wait in low-power mode before waking up to handle the beacon. A high value helps save current consumption of the access point.
DTIMDelivery Traffic Indication Message (DTIM) is the time period after which broadcast and multicast packets are transmitted to mobile clients in the Active Power Management mode. A high DTIM value can cause clients to lose connectivity with the network. This value can be set from 1 to 255.
Enable Signal ThresholdSelect the check box to use the signal threshold to ensure wireless clients receive good throughput. This allows only wireless clients with a strong signal to connect to the AP.Clear the check box to not require wireless clients to have a minimum signal strength to connect to the AP.
Station Signal ThresholdSet a minimum client signal strength. A wireless client is allowed to connect to the AP only when its signal strength is stronger than the specified threshold.-20 dBm is the strongest signal you can require and -76 is the weakest.
Disassociate Station ThresholdSet a minimum kick-off signal strength. When a wireless client's signal strength is lower than the specified threshold, the Zyxel Device disconnects the wireless client from the AP.-20 dBm is the strongest signal you can require and -90 is the weakest.
Allow Station Connection after Multiple RetriesSelect this option to allow a wireless client to try to associate with the AP again after it is disconnected due to weak signal strength.
Station Retry CountSet the maximum number of times a wireless client can attempt to re-connect to the AP
Allow 802.11n/ac/ax stations onlySelect this option to allow only 802.11 n/ac/ax stations to connect, and reject 802.11a/b/g stations.
Multicast SettingsUse this section to set a transmission mode and maximum rate for multicast traffic.
Transmission ModeSet how the AP handles multicast traffic.Select Multicast to Unicast to broadcast wireless multicast traffic to all of the wireless clients as unicast traffic. Unicast traffic dynamically changes the data rate based on the application's bandwidth requirements. The retransmit mechanism of unicast traffic provides more reliable transmission of the multicast traffic, although it also produces duplicate packets.Select Fixed Multicast Rate to send wireless multicast traffic at a single data rate. You must know the multicast application's bandwidth requirements and set it in the following field.
Multicast Rate (Mbps)If you set the multicast transmission mode to fixed multicast rate, set the data rate for multicast traffic here. For example, to deploy 4 Mbps video, select a fixed multicast rate higher than 4 Mbps.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving your changes.

39.3.2 SSID Screen

The SSID screens allow you to configure three different types of profiles for your networked APs: an SSID list, which can assign specific SSID configurations to your APs; a security list, which can assign specific encryption methods to the APs when allowing wireless clients to connect to them; and a MAC filter list, which can limit connections to an AP based on wireless clients MAC addresses.

39.3.2.1 SSID List

This screen allows you to create and manage SSID configurations that can be used by the APs. An SSID, or Service Set IDentifier, is basically the name of the wireless network to which a wireless client can connect. The SSID appears as readable text to any device capable of scanning for wireless frequencies (such as the WiFi adapter in a laptop), and is displayed as the wireless network name when a person makes a connection to it. To access this screen click Configuration > Object > AP Profile > SSID. Note: You can have a maximum of 32 SSID profiles on the Zyxel Device. Figure 485 Configuration > Object > AP Profile > SSID List ![](images/2ec3b78d13991df951b5e120dba10e5892f8bb29525a1d01387af987ccbb4724.jpg) The following table describes the labels in this screen. Table 307 Configuration > Object > AP Profile > SSID List
LABEL DESCRIPTION
Add Click this to add a new SSID profile.
Edit Click this to edit the selected SSID profile.
Remove Click this to remove the selected SSID profile.
ReferencesClick this to view which other objects are linked to the selected SSID profile (for example, radio profile).
# This field is a sequential value, and it is not associated with a specific profile.
Profile Name This field indicates the name assigned to the SSID profile.
SSID This field indicates the SSID name as it appears to wireless clients.
Security ProfileThis field indicates which (if any) security profile is associated with the SSID profile.
QoSThis field indicates the QoS type associated with the SSID profile.
MAC Filtering ProfileThis field indicates which (if any) MAC Filter Profile is associated with the SSID profile.
VLAN IDThis field indicates the VLAN ID associated with the SSID profile.

39.3.2.2 Add/Edit SSID Profile

This screen allows you to create a new SSID profile or edit an existing one. To access this screen, click the Add button or select an SSID profile from the list and click the Edit button. Figure 486 Configuration > Object > AP Profile > SSID > Add/Edit SSID Profile ![](images/7bdf4166f204b869354d4b2d74e4ceb793406c739cac4c3b11325f2368846ec2.jpg) The following table describes the labels in this screen. Table 308 Configuration > Object > AP Profile > SSID > Add/Edit SSID Profile
LABEL DESCRIPTION
Create new ObjectSelect an object type from the list to create a new one associated with this SSID profile.
Profile NameEnter up to 31 alphanumeric characters for the profile name. This name is only visible in the Web Configurator and is only for management purposes. Spaces and underscores are allowed.
SSIDEnter the SSID name for this profile. This is the name visible on the network to wireless clients. Enter up to 32 characters, spaces and underscores are allowed.
Security ProfileSelect a security profile from this list to associate with this SSID. If none exist, you can use the Create new Object menu to create one.Note: It is highly recommended that you create security profiles for all of your SSIDs to enhance your network security.
MAC Filtering ProfileSelect a MAC filtering profile from the list to associate with this SSID. If none exist, you can use the Create new Object menu to create one.MAC filtering allows you to limit the wireless clients connecting to your network through a particular SSID by wireless client MAC addresses. Any clients that have MAC addresses not in the MAC filtering profile of allowed addresses are denied connections.The disable setting means no MAC filtering is used.
LABEL DESCRIPTION
QoSSelect a Quality of Service (QoS) access category to associate with this SSID. Access categories minimize the delay of data packets across a wireless network. Certain categories, such as video or voice, are given a higher priority due to the time sensitive nature of their data packets.QoS access categories are as follows:disable:Turns off QoS for this SSID. All data packets are treated equally and not tagged with access categories.WMM:Enables automatic tagging of data packets. The Zyxel Device assigns access categories to the SSID by examining data as it passes through it and making a best guess effort. If something looks like video traffic, for instance, it is tagged as such.WMM_VOICE:All wireless traffic to the SSID is tagged as voice data. This is recommended if an SSID is used for activities like placing and receiving VoIP phone calls.WMM_VIDEO:All wireless traffic to the SSID is tagged as video data. This is recommended for activities like video conferencing.WMM_BEST_EFFORT:All wireless traffic to the SSID is tagged as “best effort,” meaning the data travels the best route it can without displacing higher priority traffic. This is good for activities that do not require the best bandwidth throughput, such as surfing the Internet.WMM_BACKGROUND:All wireless traffic to the SSID is tagged as low priority or “background traffic”, meaning all other access categories take precedence over this one. If traffic from an SSID does not have strict throughput requirements, then this access category is recommended. For example, an SSID that only has network printers connected to it.
Rate Limiting (Per Station Traffic Rate)Define the maximum incoming and outgoing transmission data rate per wireless station
Downlink:Define the maximum incoming transmission data rate (either in Mbps or Kbps) on a per-station basis.
Uplink:Define the maximum outgoing transmission data rate (either in Mbps or Kbps) on a per-station basis.
Band Select:To improve network performance and avoid interference in the 2.4 GHz frequency band, you can enable this feature to use the 5 GHz band first. You should set 2.4GHz and 5 GHz radio profiles to use the same SSID and security settings.Selectstandardto have the AP try to connect the wireless clients to the same SSID using the 5 GHz band. Connections to an SSID using the 2.4GHz band are still allowed.Otherwise, select disable to turn off this feature.
Stop ThresholdThis field is not available when you disable Band Select.Select this option and set the threshold number of the connected wireless clients at which the Zyxel Device disables the band select feature.
Balance RatioThis field is not available when you disable Band Select.Select this option and set a ratio of the wireless clients using the 5 GHz band to the wireless clients using the 2.4 GHz band.
Forwarding ModeSelect a forwarding mode (Tunnel or Local bridge) for traffic from wireless stations in this wireless network (SSID). In earlier firmware, you could only forward traffic from this wireless network with a tunnel using an existing VLAN interface in Network > Interface > VLAN > Add.From firmware version 4.60, you can select an existing VLAN interface or a local Ethernet interface (lan1, lan2) for forwarding traffic from wireless stations in this wireless network using a tunnel. These interfaces cannot be bridge members (Network > Interface > Bridge).
VLAN IDIf you selected Local Bridge forwarding mode, enter the VLAN ID that will be used to tag all traffic originating from this SSID if the VLAN is different from the native VLAN. All the wireless station’s traffic goes through the associated AP’s gateway.
VLAN InterfaceIf you selected the Tunnel forwarding mode, select a VLAN interface. All the wireless station's traffic is forwarded to the Zyxel Device first.
Hidden SSIDSelect this if you want to "hide" your SSID from wireless clients. This tells any wireless clients in the vicinity of the AP using this SSID profile not to display its SSID name as a potential connection. Not all wireless clients respect this flag and display it anyway.When an SSID is "hidden" and a wireless client cannot see it, the only way you can connect to the SSID is by manually entering the SSID name in your wireless connection setup screen(s) (these vary by client, client connectivity software, and operating system).
Enable Intra-BSS Traffic BlockingSelect this option to prevent crossover traffic from within the same SSID.
Enable U-APSDSelect this option to enable Unscheduled Automatic Power Save Delivery (U-APSD), which is also known as WMM-Power Save. This helps increase battery life for battery-powered wireless clients connected to the Zyxel Device using this SSID profile.
Enable ARP ProxyThe Address Resolution Protocol (ARP) is a protocol for mapping an IP address to a MAC address. An ARP broadcast is sent to all devices on the same Ethernet network to request the MAC address of a target IP address.Select this option to allow the Zyxel Device to answer ARP requests for an IP address on behalf of a client associated with this SSID. This can reduce broadcast traffic and improve network performance.
802.11 k/v Assisted RoamingSelect this option to enable IEEE 802.11k/v assisted roaming on the Zyxel Device. When the connected clients request 802.11k neighbor lists, the Zyxel Device will response with a list of neighbor APs that can be candidates for roaming.
Schedule SSIDSelect this option and set whether the SSID is enabled or disabled on each day of the week. You also need to select the hour and minute (in 24-hour format) to specify the time period of each day during which the SSID is enabled/enabled.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving your changes.

39.3.2.3 Security List

This screen allows you to manage wireless security configurations that can be used by your SSIDs. Wireless security is implemented strictly between the AP broadcasting the SSID and the stations that are connected to it. To access this screen click Configuration > Object > AP Profile > SSID > Security List. Note: You can have a maximum of 32 security profiles on the Zyxel Device. Figure 487 Configuration > Object > AP Profile > SSID > Security List ![](images/df9563ddf025fdf2ce901c44e0ea4c10f83cede298739571bf090b1609c429e2.jpg) The following table describes the labels in this screen. Table 309 Configuration > Object > AP Profile > SSID > Security List
LABEL DESCRIPTION
Add Click this to add a new security profile.
Edit Click this to edit the selected security profile.
Remove Click this to remove the selected security profile.
ReferencesClick this to view which other objects are linked to the selected security profile (for example, SSID profile).
# This field is a sequential value, and it is not associated with a specific profile.
Profile Name This field indicates the name assigned to the security profile.
Security Mode This field indicates this profile's security mode (if any).

39.3.2.4 Add/Edit Security Profile

This screen allows you to create a new security profile or edit an existing one. To access this screen, click the Add button or select a security profile from the list and click the Edit button. Note: This screen's options change based on the Security Mode selected. Figure 488 Configuration > Object > AP Profile > SSID > Security Profile > Add/Edit Security Profile> Security Mode: open ![](images/b0e8db4f7db3c7b651045d66ff51232900e3bbcaecece6a94eb4680566a5899a.jpg) The following table describes the labels in this screen. Table 310 Configuration > Object > AP Profile > SSID > Security Profile > Add/Edit Security Profile> Security Mode: open
LABEL DESCRIPTION
Profile NameEnter up to 31 alphanumeric characters for the profile name. This name is only visible in the Web Configurator and is only for management purposes. Spaces and underscores are allowed.
Security ModeSelect a security mode from the list: open, enhanced open, wep, wpa2, or wpa2-mix, wpa3.
Authentication Settings
EnterpriseSelect this to enable 802.1x secure authentication with a RADIUS server.
Reauthentication TimerEnter the interval (in seconds) between authentication requests. Enter a 0 for unlimited time.
Idle TimeoutEnter the idle interval (in seconds) that a client can be idle before authentication is discontinued.
Radius Settings
Primary / Secondary Radius Server ActivateSelect this to have the Zyxel Device use the specified RADIUS server.
Radius Server IP AddressEnter the IP address of the RADIUS server to be used for authentication.
Radius Server PortEnter the port number of the RADIUS server to be used for authentication.
Radius Server SecretEnter the shared secret password of the RADIUS server to be used for authentication.
Primary / Secondary Accounting Server ActivateSelect the check box to enable user accounting through an external authentication server.
Accounting Server IP AddressEnter the IP address of the external accounting server in dotted decimal notation.
Accounting Server PortEnter the port number of the external accounting server. The default port number is 1813. You need not change this value unless your network administrator instructs you to do so with additional information.
Accounting Share SecretEnter a password (up to 128 alphanumeric characters) as the key to be shared between the external accounting server and the Zyxel Device. The key must be the same on the external accounting server and your Zyxel Device. The key is not sent over the network.
Accounting Interim UpdateThis field is available only when you enable user accounting through an external authentication server.Select this to have the Zyxel Device send subscriber status updates to the accounting server at the interval you specify.
Interim Update IntervalSpecify the time interval for how often the Zyxel Device is to send a subscriber status update to the accounting server.
MAC AuthenticationSelect this to use an external server or the Zyxel Device's local database to authenticate wireless clients by their MAC addresses. Users cannot get an IP address if the MAC authentication fails.An external server can use the wireless client's account (username/password) or Calling Station ID for MAC authentication. Configure the ones the external server uses.
Delimiter (Account)Select the separator the external server uses for the two-character pairs within account MAC addresses.
Case (Account)Select the case (upper or lower) the external server requires for letters in the account MAC addresses.
Delimiter (Calling Station ID)RADIUS servers can require the MAC address in the Calling Station ID RADIUS attribute.Select the separator the external server uses for the pairs in calling station MAC addresses.
Case (Calling Station ID)Select the case (upper or lower) the external server requires for letters in the calling station MAC addresses.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving your changes.
Figure 489 Configuration > Object > AP Profile > SSID > Security Profile > Add/Edit Security Profile> Security Mode: enhanced-open ![](images/f9e082ba3ed12ec037e825d399bddde822b3f00647e0e8911686e9cdf04013e6.jpg) The following table describes the labels in this screen. Table 311 Configuration > Object > AP Profile > SSID > Security Profile > Add/Edit Security Profile> Security Mode: enhanced-open
LABEL DESCRIPTION
Profile NameEnter up to 31 alphanumeric characters for the profile name. This name is only visible in the Web Configurator and is only for management purposes. Spaces and underscores are allowed.
Security ModeSelect a security mode from the list: open, enhanced open, wep, wpa2, or wpa2-mix, wpa3.
Authentication Settings
Transition ModeEnable this for backwards compatibility. This option is only available if the Security Mode is wpa3 or enhanced-open. This creates two virtual APs (VAPs) with a primary (wpa3 or enhanced-open) and fallback (wpa2 or none) security method.If the Security Mode is wpa3, enabling this will force Management Frame Protection to be set to Optional. If this is disabled or if the Security Mode is enhanced-open, Management Frame Protection will be set to Required.
Idle TimeoutEnter the idle interval (in seconds) that a client can be idle before authentication is discontinued.
Radius Settings
Primary / Secondary Radius Server ActivateSelect this to have the Zyxel Device use the specified RADIUS server.
Radius Server IP AddressEnter the IP address of the RADIUS server to be used for authentication.
Radius Server PortEnter the port number of the RADIUS server to be used for authentication.
Radius Server SecretEnter the shared secret password of the RADIUS server to be used for authentication.
Primary / Secondary Accounting Server ActivateSelect the check box to enable user accounting through an external authentication server.
Accounting Server IP AddressEnter the IP address of the external accounting server in dotted decimal notation.
Accounting Server PortEnter the port number of the external accounting server. The default port number is 1813. You need not change this value unless your network administrator instructs you to do so with additional information.
Accounting Share SecretEnter a password (up to 128 alphanumeric characters) as the key to be shared between the external accounting server and the Zyxel Device. The key must be the same on the external accounting server and your Zyxel Device. The key is not sent over the network.
Accounting Interim UpdateThis field is available only when you enable user accounting through an external authentication server.Select this to have the Zyxel Device send subscriber status updates to the accounting server at the interval you specify.
Interim Update IntervalSpecify the time interval for how often the Zyxel Device is to send a subscriber status update to the accounting server.
MAC AuthenticationSelect this to use an external server or the Zyxel Device's local database to authenticate wireless clients by their MAC addresses. Users cannot get an IP address if the MAC authentication fails.An external server can use the wireless client's account (username/password) or Calling Station ID for MAC authentication. Configure the ones the external server uses.
Delimiter (Account)Select the separator the external server uses for the two-character pairs within account MAC addresses.
Case (Account)Select the case (upper or lower) the external server requires for letters in the account MAC addresses.
Delimiter (Calling Station ID)RADIUS servers can require the MAC address in the Calling Station ID RADIUS attribute.Select the separator the external server uses for the pairs in calling station MAC addresses.
Case (Calling Station ID)Select the case (upper or lower) the external server requires for letters in the calling station MAC addresses.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving your changes.
Figure 490 Configuration > Object > AP Profile > SSID > Security Profile > Add/Edit Security Profile> Security Mode: wep ![](images/94f27010b9408a1207f86ea3c9dd5b06784bfc062f5aac78787039321950e3ad.jpg) The following table describes the labels in this screen. Table 312 Configuration > Object > AP Profile > SSID > Security Profile > Add/Edit Security Profile> Security Mode: wep
LABEL DESCRIPTION
Profile NameEnter up to 31 alphanumeric characters for the profile name. This name is only visible in the Web Configurator and is only for management purposes. Spaces and underscores are allowed.
Security ModeSelect a security mode from the list: open, enhanced open, wep, wpa2, or wpa2-mix, wpa3.
Authentication Settings
EnterpriseSelect this to enable 802.1x secure authentication with a RADIUS server.
Reauthentication TimerEnter the interval (in seconds) between authentication requests. Enter a 0 for unlimited time.
Idle TimeoutEnter the idle interval (in seconds) that a client can be idle before authentication is discontinued.
Authentication TypeSelect a WEP authentication method. Choices are Open or Share key.
Key LengthSelect the bit-length of the encryption key to be used in WEP connections.If you select WEP-64:Enter 10 hexadecimal digits in the range of “A-F”, “a-f” and “0-9” (for example, 0x11AA22BB33) for each Key used.orEnter 5 ASCII characters (case sensitive) ranging from “a-z”, “A-Z” and “0-9” (for example, MyKey) for each Key used.If you select WEP-128:Enter 26 hexadecimal digits in the range of “A-F”, “a-f” and “0-9” (for example, 0x00112233445566778899AABBCC) for each Key used.orEnter 13 ASCII characters (case sensitive) ranging from “a-z”, “A-Z” and “0-9” (for example, MyKey12345678) for each Key used.
Key 1~4Based on your Key Length selection, enter the appropriate length hexadecimal or ASCII key.
Radius Settings
Primary / Secondary Radius Server ActivateSelect this to have the Zyxel Device use the specified RADIUS server.
Radius Server IP AddressEnter the IP address of the RADIUS server to be used for authentication.
Radius Server PortEnter the port number of the RADIUS server to be used for authentication.
Radius Server SecretEnter the shared secret password of the RADIUS server to be used for authentication.
Primary / Secondary Accounting Server ActivateSelect the check box to enable user accounting through an external authentication server.
Accounting Server IP AddressEnter the IP address of the external accounting server in dotted decimal notation.
Accounting Server PortEnter the port number of the external accounting server. The default port number is 1813. You need not change this value unless your network administrator instructs you to do so with additional information.
Accounting Share SecretEnter a password (up to 128 alphanumeric characters) as the key to be shared between the external accounting server and the Zyxel Device. The key must be the same on the external accounting server and your Zyxel Device. The key is not sent over the network.
Accounting Interim UpdateThis field is available only when you enable user accounting through an external authentication server.Select this to have the Zyxel Device send subscriber status updates to the accounting server at the interval you specify.
Interim Update IntervalSpecify the time interval for how often the Zyxel Device is to send a subscriber status update to the accounting server.
MAC AuthenticationSelect this to use an external server or the Zyxel Device's local database to authenticate wireless clients by their MAC addresses. Users cannot get an IP address if the MAC authentication fails.An external server can use the wireless client's account (username/password) or Calling Station ID for MAC authentication. Configure the ones the external server uses.
Delimiter (Account)Select the separator the external server uses for the two-character pairs within account MAC addresses.
Case (Account)Select the case (upper or lower) the external server requires for letters in the account MAC addresses.
Delimiter (Calling Station ID)RADIUS servers can require the MAC address in the Calling Station ID RADIUS attribute.Select the separator the external server uses for the pairs in calling station MAC addresses.
Case (Calling Station ID)Select the case (upper or lower) the external server requires for letters in the calling station MAC addresses.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving your changes.
Figure 491 Configuration > Object > AP Profile > SSID > Security Profile > Add/Edit Security Profile> Security Mode: wpa2/ wpa2-mix ![](images/7c2938da509955b62f740a382d2cb5ac84db0dfdd7ebb8fc6342adf9dce2f6bd.jpg) The following table describes the labels in this screen. Table 313 Configuration > Object > AP Profile > SSID > Security Profile > Add/Edit Security Profile> Security Mode: wpa2/ wpa2-mix
LABEL DESCRIPTION
Profile NameEnter up to 31 alphanumeric characters for the profile name. This name is only visible in the Web Configurator and is only for management purposes. Spaces and underscores are allowed.
Security ModeSelect a security mode from the list: open, enhanced open, wep, wpa2, or wpa2-mix, wpa3.
Authentication Settings
EnterpriseSelect this to enable 802.1x secure authentication with a RADIUS server.
Reauthentication TimerEnter the interval (in seconds) between authentication requests. Enter a 0 for unlimited time.
PersonalThis field is available when you select the wpa2, wpa2-mix or wpa3 security mode.Select this option to use a Pre-Shared Key (PSK) with WPA2 encryption or Simultaneous Authentication of Equals (SAE) with WPA3 encryption.
Pre-Shared KeyEnter a pre-shared key of between 8 and 63 case-sensitive ASCII characters (including spaces and symbols) or 64 hexadecimal characters.
Cipher Type Select anencryption cipher type from the list.auto - This automatically chooses the best available cipher based on the cipher in use by the wireless client that is attempting to make a connection.aes - This is the Advanced Encryption Standard encryption method. It is a more recent development over TKIP and considerably more robust. Not all wireless clients may support this.
Idle TimeoutEnter the idle interval (in seconds) that a client can be idle before authentication is discontinued.
Group Key Update TimerEnter the interval (in seconds) at which the AP updates the group WPA2 encryption key.
Management Frame ProtectionThis field is available only when you select wpa2 in the Security Mode field and set Cipher Type to aes.Data frames in 802.11 WLANs can be encrypted and authenticated with WEP, WPA or WPA2. But 802.11 management frames, such as beacon/probe response, association request, association response, de-authentication and disassociation are always unauthenticated and unencrypted. IEEE 802.11w Protected Management Frames allows APs to use the existing security mechanisms (encryption and authentication methods defined in IEEE 802.11i WPA/WPA2) to protect management frames. This helps prevent wireless DoS attacks.Select the check box to enable management frame protection (MFP) to add security to 802.11 management frames.SelectOptional if you do not require the wireless clients to support MFP. Management frames will be encrypted if the clients support MFP.SelectRequired and wireless clients must support MFP in order to join the Zyxel Device's wireless network.
Fast Roaming SettingsIEEE 802.11r fast roaming, which is also known as Fast BSS Transition (FT), allows wireless clients to quickly move from one AP to another in a WiFi network that uses WPA2 with 802.1x authentication. Information from the original association is passed to the target AP when the client roams. The client doesn't need to perform the whole 802.1x authentication process. Messages exchanged between the target AP and client are reduced and performed using one of the two methods:Over-the-DS: The wireless client communicates with the target AP via the current AP. The communication is sent to the target AP through the wired Ethernet connection.Over-the-Air: The wireless client communicates directly with the target AP.
802.11rSelect this to turn on IEEE 802.11r fast roaming on the AP (Zyxel Device). This is good for wireless clients that transport a lot of real-time interactive traffic, such as voice and video. Wireless clients should also support WPA2 and fast roaming to associate with the AP (Zyxel Device) and roam seamlessly.
Radius Settings
Primary / Secondary Radius Server ActivateSelect this to have the Zyxel Device use the specified RADIUS server.
Radius Server IP AddressEnter the IP address of the RADIUS server to be used for authentication.
Radius Server PortEnter the port number of the RADIUS server to be used for authentication.
Radius Server SecretEnter the shared secret password of the RADIUS server to be used for authentication.
Primary / Secondary Accounting Server ActivateSelect the check box to enable user accounting through an external authentication server.
Accounting Server IP AddressEnter the IP address of the external accounting server in dotted decimal notation.
Accounting Server PortEnter the port number of the external accounting server. The default port number is 1813. You need not change this value unless your network administrator instructs you to do so with additional information.
Accounting Share SecretEnter a password (up to 128 alphanumeric characters) as the key to be shared between the external accounting server and the Zyxel Device. The key must be the same on the external accounting server and your Zyxel Device. The key is not sent over the network.
Accounting Interim UpdateThis field is available only when you enable user accounting through an external authentication server.Select this to have the Zyxel Device send subscriber status updates to the accounting server at the interval you specify.
Interim Update IntervalSpecify the time interval for how often the Zyxel Device is to send a subscriber status update to the accounting server.
MAC AuthenticationSelect this to use an external server or the Zyxel Device's local database to authenticate wireless clients by their MAC addresses. Users cannot get an IP address if the MAC authentication fails.An external server can use the wireless client's account (username/password) or Calling Station ID for MAC authentication. Configure the ones the external server uses.
Delimiter (Account)Select the separator the external server uses for the two-character pairs within account MAC addresses.
Case (Account)Select the case (upper or lower) the external server requires for letters in the account MAC addresses.
Delimiter (Calling Station ID)RADIUS servers can require the MAC address in the Calling Station ID RADIUS attribute.Select the separator the external server uses for the pairs in calling station MAC addresses.
Case (Calling Station ID)Select the case (upper or lower) the external server requires for letters in the calling station MAC addresses.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving your changes.
Figure 492 Configuration > Object > AP Profile > SSID > Security Profile > Add/Edit Security Profile> Security Mode: wpa3 ![](images/3fe241c2a854524c0e2e2430941958420b37b28f2bf92954d4e32c17c127f4fb.jpg) The following table describes the labels in this screen. Table 314 Configuration > Object > AP Profile > SSID > Security Profile > Add/Edit Security Profile> Security Mode: wpa3
LABEL DESCRIPTION
Profile NameEnter up to 31 alphanumeric characters for the profile name. This name is only visible in the Web Configurator and is only for management purposes. Spaces and underscores are allowed.
Security ModeSelect a security mode from the list: open, enhanced open, wep, wpa2, or wpa2-mix, wpa3.
Authentication Settings
EnterpriseSelect this to enable 802.1x secure authentication with a RADIUS server.
Reauthentication TimerEnter the interval (in seconds) between authentication requests. Enter a 0 for unlimited time.
PersonalThis field is available when you select the wpa2, wpa2-mix or wpa3 security mode.Select this option to use a Pre-Shared Key (PSK) with WPA2 encryption or Simultaneous Authentication of Equals (SAE) with WPA3 encryption.
Pre-Shared KeyEnter a pre-shared key of between 8 and 63 case-sensitive ASCII characters (including spaces and symbols) or 64 hexadecimal characters.
Transition ModeEnable this for backwards compatibility. This option is only available if the Security Mode is wpa3 or enhanced-open. This creates two virtual APs (VAPs) with a primary (wpa3 or enhanced-open) and fallback (wpa2 or none) security method.If the Security Mode is wpa3, enabling this will force Management Frame Protection to be set to Optional. If this is disabled or if the Security Mode is enhanced-open, Management Frame Protection will be set to Required.
Idle TimeoutEnter the idle interval (in seconds) that a client can be idle before authentication is discontinued.
Group Key Update TimerEnter the interval (in seconds) at which the AP updates the group WPA2 encryption key.
Management Frame ProtectionThis field is available only when you select wpa2 in the Security Mode field and set Cipher Type to aes.Data frames in 802.11 WLANs can be encrypted and authenticated with WEP, WPA or WPA2. But 802.11 management frames, such as beacon/probe response, association request, association response, de-authentication and disassociation are always unauthenticated and unencrypted. IEEE 802.11w Protected Management Frames allows APs to use the existing security mechanisms (encryption and authentication methods defined in IEEE 802.11i WPA/WPA2) to protect management frames. This helps prevent wireless DoS attacks.Select the check box to enable management frame protection (MFP) to add security to 802.11 management frames.Select Optional if you do not require the wireless clients to support MFP. Management frames will be encrypted if the clients support MFP.Select Required and wireless clients must support MFP in order to join the Zyxel Device's wireless network.
Radius Settings
Primary / Secondary Radius Server ActivateSelect this to have the Zyxel Device use the specified RADIUS server.
Radius Server IP AddressEnter the IP address of the RADIUS server to be used for authentication.
Radius Server PortEnter the port number of the RADIUS server to be used for authentication.
Radius Server SecretEnter the shared secret password of the RADIUS server to be used for authentication.
Primary / Secondary Accounting Server ActivateSelect the check box to enable user accounting through an external authentication server.
Accounting Server IP AddressEnter the IP address of the external accounting server in dotted decimal notation.
Accounting Server PortEnter the port number of the external accounting server. The default port number is 1813. You need not change this value unless your network administrator instructs you to do so with additional information.
Accounting Share SecretEnter a password (up to 128 alphanumeric characters) as the key to be shared between the external accounting server and the Zyxel Device. The key must be the same on the external accounting server and your Zyxel Device. The key is not sent over the network.
Accounting Interim UpdateThis field is available only when you enable user accounting through an external authentication server.Select this to have the Zyxel Device send subscriber status updates to the accounting server at the interval you specify.
Interim Update IntervalSpecify the time interval for how often the Zyxel Device is to send a subscriber status update to the accounting server.
MAC AuthenticationSelect this to use an external server or the Zyxel Device's local database to authenticate wireless clients by their MAC addresses. Users cannot get an IP address if the MAC authentication fails.An external server can use the wireless client's account (username/password) or Calling Station ID for MAC authentication. Configure the ones the external server uses.
Delimiter (Account)Select the separator the external server uses for the two-character pairs within account MAC addresses.
Case (Account)Select the case (upper or lower) the external server requires for letters in the account MAC addresses.
Delimiter (Calling Station ID)RADIUS servers can require the MAC address in the Calling Station ID RADIUS attribute.Select the separator the external server uses for the pairs in calling station MAC addresses.
Case (Calling Station ID)Select the case (upper or lower) the external server requires for letters in the calling station MAC addresses.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving your changes.

39.3.2.5 MAC Filter List

This screen allows you to create and manage security configurations that can be used by your SSIDs. To access this screen click Configuration > Object > AP Profile > SSID > MAC Filter List. Note: You can have a maximum of 32 MAC filtering profiles on the Zyxel Device. Figure 493 Configuration > Object > AP Profile > SSID > MAC Filter List ![](images/b19ac787b2d768017707af5d0903e756a248082308c554cc72743d8ddff7985b.jpg) The following table describes the labels in this screen. Table 315 Configuration > Object > AP Profile > SSID > MAC Filter List
LABEL DESCRIPTION
Add Click this to add a new MAC filtering profile.
Edit Click this to edit the selected MAC filtering profile.
Remove Click this to remove the selected MAC filtering profile.
ReferencesClick this to view which other objects are linked to the selected MAC filtering profile (for example, SSID profile).
# This field is a sequential value, and it is not associated with a specific profile.
Profile NameThis field indicates the name assigned to the MAC filtering profile.
Filter Action This field indicates this profile's filter action (if any).

39.3.2.6 Add/Edit MAC Filter Profile

This screen allows you to create a new MAC filtering profile or edit an existing one. To access this screen, click the Add button or select a MAC filter profile from the list and click the Edit button. Figure 494 SSID > MAC Filter List > Add/Edit MAC Filter Profile ![](images/ffa12cd4d7355df7c893757fd6d14173fdae50866eaa6f1dd6d5d1580a273183.jpg) The following table describes the labels in this screen. Table 316 SSID > MAC Filter List > Add/Edit MAC Filter Profile
LABEL DESCRIPTION
Profile NameEnter up to 31 alphanumeric characters for the profile name. This name is only visible in the Web Configurator and is only for management purposes. Spaces and underscores are allowed.
Filter ActionSelect allow to permit the wireless client with the MAC addresses in this profile to connect to the network through the associated SSID; select deny to block the wireless clients with the specified MAC addresses.
Add Click this to add a MAC address to the profile's list.
EditClick this to edit the selected MAC address in the profile's list.
RemoveClick this to remove the selected MAC address from the profile's list.
#This field is a sequential value, and it is not associated with a specific profile.
MACThis field specifies a MAC address associated with this profile.
DescriptionThis field displays a description for the MAC address associated with this profile. You can click the description to make it editable. Enter up to 60 characters, spaces and underscores allowed.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving your changes.

39.4 MON Profile

39.4.1 Overview

This screen allows you to set up monitor mode configurations that allow your connected APs to scan for other wireless devices in the vicinity. Once detected, you can use the Rogue AP screen (Section 8.4 on page 220) to classify them as either rogue or friendly and then manage them accordingly. The MON Profile screen (Section 39.4.2 on page 758) creates preset monitor mode configurations that can be used by the APs.

39.4.1.1 What You Need To Know

The following terms and concepts may help as you read this chapter.

Active Scan

An active scan is performed when an 802.11-compatible wireless monitoring device is explicitly triggered to scan a specified channel or number of channels for other wireless devices broadcasting on the 802.11 frequencies by sending probe request frames.

Passive Scan

A passive scan is performed when an 802.11-compatible monitoring device is set to periodically listen to a specified channel or number of channels for other wireless devices broadcasting on the 802.11 frequencies.

39.4.2 Configuring MON Profile

This screen allows you to create monitor mode configurations that can be used by the APs. To access this screen, login to the Web Configurator, and click Configuration > Object > MON Profile. Figure 495 Configuration > Object > MON Profile ![](images/630f7c90726f198b160e9c6266ffb563cee7c9587cd72d2e67e23a9a68fa8bde.jpg) The following table describes the labels in this screen. Table 317 Configuration > Object > MON Profile
LABEL DESCRIPTION
Add Click this to add a new monitor mode profile.
Edit Click this to edit the selected monitor mode profile.
RemoveClick this to remove the selected monitor mode profile.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
ReferencesClick this to view which other objects are linked to the selected monitor mode profile (for example, an AP management profile).
# This field is a sequential value, and it is not associated with a specific user.
Status This icon is lit when the entry is active and dimmed when the entry is inactive.
Profile NameThis field indicates the name assigned to the monitor profile.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

39.4.3 Add/Edit MON Profile

This screen allows you to create a new monitor mode profile or edit an existing one. To access this screen, click the Add button or select and existing monitor mode profile and click the Edit button. Figure 496 Configuration > Object > MON Profile > Add/Edit MON Profile ![](images/62c6f51a0adf0cddbaeaa618a0ff133ca5c950fa94b0d178fab7350d5e6e15f6.jpg) The following table describes the labels in this screen. Table 318 Configuration > Object > MON Profile > Add/Edit MON Profile
LABEL DESCRIPTION
Activate Select this toactivate this monitor mode profile.
Profile NameThis field indicates the name assigned to the monitor mode profile.
Channel dwell timeEnter the interval (in milliseconds) before the AP switches to another channel for monitoring.
Scan Channel ModeSelect auto to have the AP switch to the next sequential channel once the Channel dwell time expires.Select manual to set specific channels through which to cycle sequentially when the Channel dwell time expires. Selecting this options makes the Scan Channel List options available.
Country CodeSelect the country code of APs that are connected to the Zyxel Device to be the same as where the Zyxel Device is located/installed.The available channels vary depending on the country you selected. Be sure to select the correct/same country for both radios on an AP and all connected APs, in order to prevent roaming failure and interference to other systems.Note: For US and Canada models, country code is fixed to US or Canada respectively and is not user selectable.
Set Scan Channel List (2.4 GHz)Move a channel from the Available channels column to the Channels selected column to have the APs using this profile scan that channel when Scan Channel Mode is set to manual.These channels are limited to the 2 GHz range (802.11 b/g/n).
Set Scan Channel List (5 GHz)Move a channel from the Available channels column to the Channels selected column to have the APs using this profile scan that channel when Scan Channel Mode is set to manual.These channels are limited to the 5 GHz range (802.11 a/n).
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving your changes.

39.4.4 Technical Reference

The following section contains additional technical information about the features described in this chapter.

Rogue APs

Rogue APs are wireless access points operating in a network's coverage area that are not under the control of the network's administrators, and can open up holes in a network's security. Attackers can take advantage of a rogue AP's weaker (or non-existent) security to gain access to the network, or set up their own rogue APs in order to capture information from wireless clients. If a scan reveals a rogue AP, you can use commercially-available software to physically locate it. Figure 497 Rogue AP Example ![](images/851935a799ff1f3b71c0869ef49a0432429fd49cc9eef8cb88717846fe61f10f.jpg)
flowchart
graph TD
    A["Device X"] -->|Wireless| RG["RG"]
    B["Device B"] -->|Wireless| RG
    C["Device C"] -->|Wireless| RG
    D["Device A"] -->|Wireless| RG
    RG -->|Internet| E["Internet"]
In the example above, a corporate network's security is compromised by a rogue AP (RG) set up by an employee at his workstation in order to allow him to connect his notebook computer wirelessly (A). The company's legitimate wireless network (the dashed ellipse B) is well-secured, but the rogue AP uses inferior security that is easily broken by an attacker (X) running readily available encryption-cracking software. In this example, the attacker now has access to the company network, including sensitive data stored on the file server (C).

Friendly APs

If you have more than one AP in your wireless network, you should also configure a list of "friendly" APs. Friendly APs are other wireless access points that are detected in your network, as well as any others that you know are not a threat (those from recognized networks, for example). It is recommended that you export (save) your list of friendly APs often, especially if you have a network with a large number of access points.

39.5 ZyMesh Overview

This section shows you how to configure ZyMesh profiles for the Zyxel Device to apply to the managed APs. ZyMesh is a Zyxel proprietary protocol that creates wireless mesh links between managed APs to expand the wireless network. Managed APs can provide services or forward traffic between the Zyxel Device and wireless clients. ZyMesh also allows the Zyxel Device to use CAPWAP to automatically update the configuration settings on the managed APs (in repeater mode) through wireless connections. The managed APs (in repeater mode) are provisioned hop by hop. The managed APs in a ZyMesh must use the same SSID, channel number and pre-shared key. A manged AP can be either a root AP or repeater in a ZyMesh. Note: All managed APs should be connected to the Zyxel Device directly to get the configuration file before being deployed to build a ZyMesh. Ensure you restart the managed AP after you change its operating mode using the Configuration > Wireless > AP Management screen (see Section 8.3 on page 204). - Root AP: a managed AP that can transmit and receive data from the Zyxel Device via a wired Ethernet connection. - Repeater: a managed AP that transmits and/or receives data from the Zyxel Device via a wireless connection through a root AP. Note: When managed APs are deployed to form a ZyMesh for the first time, the root AP must be connected to an AP controller (the Zyxel Device). In the following example, managed APs 1 and 2 act as a root AP and managed APs A, B and C are repeaters. ![](images/1d360fd3e310f3ab9738afc2fc72c522e5b1d3f4a058aa6403e086efefdc5910.jpg)
flowchart
graph TD
    A["Internet"] --> B["Central Network Node"]
    B --> C["Component 1: Laptop & Wireless"]
    B --> D["Component 2: Wireless"]
    B --> E["Component 3: Wireless"]
    B --> F["Component C: Wireless"]
    B --> G["Component A: Wireless"]
    B --> H["Component B: Smartphone & Cloud"]
    B --> I["Component C: Computer & Monitor"]
The maximum number of hops (the repeaters between a wireless client and the root AP) you can have in a ZyMesh varies according to how many wireless clients a managed AP can support. Note: A ZyMesh link with more hops has lower throughput. Note: When the wireless connection between the root AP and the repeater is up, in order to prevent bridge loops, the repeater would not be able to transmit data through its Ethernet port(s). The repeater then could only receive power from a PoE device if you use PoE to provide power to the managed AP via an 8-ping Ethernet cable.

39.5.1 ZyMesh Profile

This screen allows you to manage and create ZyMesh profiles that can be used by the APs. To access this screen, click Configuration > Object > ZyMesh Profile. Figure 498 Configuration > Object > ZyMesh Profile ![](images/0e62eed5aebd26d8e1c37d95ddf16840eb99ca80758c2b75dbaa735f6b0d5991.jpg) The following table describes the labels in this screen. Table 319 Configuration > Object > ZyMesh Profile
LABEL DESCRIPTION
Hide / Show Advanced SettingsClick this to display a greater or lesser number of configuration fields.
ZyMesh Provision GroupBy default, this shows the MAC address used by the Zyxel Device's first Ethernet port.Say you have two AP controllers (Zyxel Devices) in your network and the primary AP controller is not reachable. You may want to deploy the second/backup AP controller in your network to replace the primary AP controller. In this case, it is recommended that you enter the primary AP controller's ZyMesh Provision Group MAC address in the second AP controller's ZyMesh Provision Group field.If you didn't change the second AP controller's MAC address, managed APs in an existing ZyMesh can still access the networks through the second AP controller and communicate with each other. But new managed APs will not be able to communicate with the managed APs in the existing ZyMesh, which is set up with the primary AP controller's MAC address.To allow all managed APs to communicate in the same ZyMesh, you can just set the second AP controller to use the primary AP controller's MAC address. Otherwise, reset all managed APs to the factory defaults and set up a new ZyMesh with the second AP controller's MAC address.
NextClick this button and follow the on-screen instructions to update the AP controller's MAC address.
Add Click this to add a new profile.
Edit Click this to edit the selected profile.
Remove Click this to remove the selected profile.
# This field is a sequential value, and it is not associated with a specific profile.
LABEL DESCRIPTION
Profile Name This field indicates the name assigned to the profile.
ZyMesh SSID This field shows the SSID specified in this ZyMesh profile.

39.5.2 Add/Edit ZyMesh Profile

This screen allows you to create a new ZyMesh profile or edit an existing one. To access this screen, click the Add button or select and existing profile and click the Edit button. Figure 499 Configuration > Object > ZyMesh Profile > Add/Edit ZyMesh Profile ![](images/c1894a3fe8086ccce2ea5af1ca22cda95cc376d9b31129af74163753aebc33e3.jpg) The following table describes the labels in this screen. Table 320 Configuration > Object > ZyMesh Profile > Add/Edit ZyMesh Profile
LABEL DESCRIPTION
Profile Name Enter up to 31 alphanumeric characters for the profile name.
ZyMesh SSIDEnter the SSID with which you want the managed AP to connect to a root AP or repeater to build a ZyMesh link.Note: The ZyMesh SSID is hidden in the outgoing beacon frame so a wireless device cannot obtain the SSID through scanning using a site survey tool.
Pre-Shared KeyEnter a pre-shared key of between 8 and 63 case-sensitive ASCII characters (including spaces and symbols) or 64 hexadecimal characters.The key is used to encrypt the wireless traffic between the APs.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving your changes.

39.6 Address/ Geo IP Overview

Address objects can represent a single IP address or a range of IP addresses. Address groups are composed of address objects and other address groups. - The Address screen (Section 39.6.2 on page 765) provides a summary of all addresses in the Zyxel Device. Use the Address Add/Edit screen to create a new address or edit an existing one. - Use the Address Group summary screen (Section 39.6.3 on page 769) and the Address Group Add/Edit screen, to maintain address groups in the Zyxel Device. - Use the Geo IP screen (Section 39.6.4 on page 771) to update the database of country-to-IP address mappings and to manually configure country-to-IP address mappings.

39.6.1 What You Need To Know

Address objects and address groups are used in dynamic routes, security policies, application patrol, content filtering, and VPN connection policies. For example, addresses are used to specify where content restrictions apply in content filtering. Please see the respective sections for more information about how address objects and address groups are used in each one. Address groups are composed of address objects and address groups. The sequence of members in the address group is not important.

39.6.2 Address Summary Screen

The address screens are used to create, maintain, and remove addresses. There are the types of address objects: - HOST - the object uses an IP Address to define a host address - RANGE - the object uses a range address defined by a Starting IP Address and an Ending IP Address - SUBNET - the object uses a network address defined by a Network IP address and Netmask subnet mask - INTERFACE IP - the object uses the IP address of one of the Zyxel Device's interfaces - INTERFACE SUBNET - the object uses the subnet mask of one of the Zyxel Device's interfaces - INTERFACE GATEWAY - the object uses the gateway IP address of one of the Zyxel Device's interfaces - GEOGRAPHY - the object uses the IP addresses of a country to represent a country FQDN - the object uses a FQDN (Fully Qualified Domain Name). An FQDN consists of a host and domain name. For example, www.zyxel.com is a fully qualified domain name, where "www" is the host, "zyxel" is the second-level domain, and "com" is the top level domain. mail.myZyxel.com.tw is also an FQDN, where "mail" is the host, "myZyxel" is the third-level domain, "com" is the second-level domain, and "tw" is the top level domain. Table 321 FQDN Example
HTTP://WWW.ZYXEL.COM
host name second-level domain nametop-level domain name
FQDN
Uniform Resource Locator (URL)
In an address FQDN object, you can also use one wildcard. For example, \*.zyxel.com. An FQDN is resolved to its IP address using the DNS server configured on the Zyxel Device. The Address screen provides a summary of all addresses in the Zyxel Device. To access this screen, click Configuration > Object > Address > Address. Click a column's heading cell to sort the table entries by that column's criteria. Click the heading cell again to reverse the sort order. Figure 500 Configuration > Object > Address/Geo IP > Address ![](images/cb4c7a8df8c1767c58c5bf08fb2a88852537aa9b2523166939c97ee389e91ca9.jpg) The following table describes the labels in this screen. See Section 39.6.2.1 on page 767 for more information as well. Table 322 Configuration > Object > Address/Geo IP > Address
LABEL DESCRIPTION
IPv4 Address Configuration
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to be able to modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry.
#This field is a sequential value, and it is not associated with a specific address.
Name This field displays the configured name of each address object.
TypeThis field displays the type of each address object. "INTERFACE" means the object uses the settings of one of the Zyxel Device's interfaces.
IPv4 AddressThis field displays the IPv4 addresses represented by each address object. If the object's settings are based on one of the Zyxel Device's interfaces, the name of the interface displays first followed by the object's current address settings.
Reference This displays the number of times an object reference is used in a profile.
IPv6 Address Configuration
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to be able to modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry.
#This field is a sequential value, and it is not associated with a specific address.
Name This field displays the configured name of each address object.
TypeThis field displays the type of each address object. “INTERFACE” means the object uses the settings of one of the Zyxel Device's interfaces.
IPv6 AddressThis field displays the IPv6 addresses represented by each address object. If the object's settings are based on one of the Zyxel Device's interfaces, the name of the interface displays first followed by the object's current address settings.
Reference This displays the number of times an object reference is used in a profile.

39.6.2.1 IPv4 Address Add/Edit Screen

The Configuration > Object > Address/ GeoIP > Address > Add/ Edit (IPv4) screen allows you to create a new address or edit an existing one. To access this screen, go to the Address screen (see Section 39.6.2 on page 765), and click either the Add icon or an Edit icon in the IPv4 Address Configuration section. Figure 501 Configuration > Object > Address/GeoIP > Address > Add/Edit (IPv4) t ![](images/6ff22a5f5ee2bd4bdba3f60e1ad8737ebf6f4a458e0a379f93c5b9d075b29e29.jpg) The following table describes the labels in this screen. Table 323 Configuration > Object > Address/GeoIP > Address > Add/Edit (IPv4)
LABEL DESCRIPTION
NameType the name used to refer to the address. You may use 1-31 alphanumeric characters, underscores( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive.
Address Type Selectthe type of address you want to create.Note: The Zyxel Device automatically updates address objects that are based on an interface's IP address, subnet, or gateway if the interface's IP address settings change. For example, if you change 1's IP address, the Zyxel Device automatically updates the corresponding interface-based, LAN subnet address object.
IP AddressThis field is only available if the Address Type is HOST. This field cannot be blank. Enter the IP address that this address object represents.
Starting IP AddressThis field is only available if the Address Type is RANGE. This field cannot be blank. Enter the beginning of the range of IP addresses that this address object represents.
Table 323 Configuration > Object > Address/GeoIP > Address > Add/Edit (IPv4)
LABEL DESCRIPTION
Ending IP AddressThis field is only available if theAddress Typeis RANGE. This field cannot be blank. Enter the end of the range of IP address that this address object represents.
NetworkThis field is only available if theAddress Typeis SUBNET, in which case this field cannot be blank.Enter the IP address of the network that this address object represents.
NetmaskThis field is only available if theAddress Typeis SUBNET, in which case this field cannot be blank.Enter the subnet mask of the network that this address object represents. Use dotted decimal format.
InterfaceIf you selectedINTERFACE IP, INTERFACE SUBNET, or INTERFACE GATEWAY as theAddress Type, use this field to select the interface of the network that this address object represents.
RegionIf you selectedGEOGRAPHYas theAddress Type, use this field to select a country or continent.A GEOGRAPHYobject uses the data from the country-to-IP/continent-to-IP address database.Go to theConfiguration>Object>Address/Geo IP>Geo IPscreen to configure the custom country-to-IP/continent-to-IP address mappings for a GEOGRAPHYobject.
CountryIf you selectedGeographyas theAddress Type, use this field to select a country.
FQDNIf you selectedFQDNas theAddress Type, use this field to enter a fully qualified domain name.
OKClickOKto save your changes back to the Zyxel Device.
CancelClickCancelto exit this screen without saving your changes.

39.6.2.2 IPv6 Address Add/Edit Screen

The Configuration > Object > Address/ GeoIP > Address > Add/ Edit (IPv6) screen allows you to create a new address or edit an existing one. To access this screen, go to the Address screen (see Section 39.6.2 on page 765), and click either the Add icon or an Edit icon in the IPv6 Address Configuration section. Figure 502 Configuration > Object > Address/GeoIP > Address > Add/Edit (IPv6) ![](images/fadd89660815fd815a58d777a80db814db0eee760e3c68ff50447e1933e2bdfe.jpg) The following table describes the labels in this screen. Table 324 Configuration > Object > Address/GeoIP > Address > Add/Edit (IPv6)
LABEL DESCRIPTION
NameType the name used to refer to the address. You may use 1-31 alphanumeric characters, underscores( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive.
Object Type Selectthe type of address you want to create.Note: The Zyxel Device automatically updates address objects that are based on an interface's IP address, subnet, or gateway if the interface's IP address settings change. For example, if you change 1's IP address, the Zyxel Device automatically updates the corresponding interface-based, LAN subnet address object.
IPv6 AddressThis field is only available if theAddress Typeis HOST. This field cannot be blank. Enter the IP address that this address object represents.
Table 324 Configuration > Object > Address/GeoIP > Address > Add/Edit (IPv6)
LABEL DESCRIPTION
IPv6 Starting AddressThis field is only available if theAddress Typeis RANGE. This field cannot be blank. Enter the beginning of the range of IP addresses that this address object represents.
IPv6 Ending AddressThis field is only available if theAddress Typeis RANGE. This field cannot be blank. Enter the end of the range of IP address that this address object represents.
IPv6 Address PrefixThis field is only available if theAddress Typeis SUBNET. This field cannot be blank. Enter the IPv6 address prefix that the Zyxel Device uses for the LAN IPv6 address.
InterfaceIf you selectedINTERFACE IP, INTERFACE SUBNET, or INTERFACE GATEWAYas theAddress Type, use this field to select the interface of the network that this address object represents.
IPv6 Address TypeSelect whether the IPv6 address is a link-local IP address (LINK LOCAL), static IP address (STATIC), an IPv6 StateLess Address Auto Configuration IP address (SLAAC), or is obtained from a DHCPv6 server (DHCPv6).
RegionIf you selectedGeographyas theAddress Type, use this field to select a country or continent.
FQDNIf you selectedFQDNas theAddress Type, use this field to enter a fully qualified domain name.
OKClick OKto save your changes back to the Zyxel Device.
CancelClick Cancelto exit this screen without saving your changes.

39.6.3 Address Group Summary Screen

The Address Group screen provides a summary of all address groups. To access this screen, click Configuration > Object > Address/Geo IP > Address Group. Click a column's heading cell to sort the table entries by that column's criteria. Click the heading cell again to reverse the sort order. Figure 503 Configuration > Object > Address/Geo IP > Address Group ![](images/a6e3c6d921853215f8ee363f93747200e49f069fdf3b24ffbc32d191d26e440f.jpg) The following table describes the labels in this screen. See Section 39.6.3.1 on page 770 for more information as well. Table 325 Configuration > Object > Address/Geo IP > Address Group
LABEL DESCRIPTION
IPv4 Address Group Configuration
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to be able to modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry.
#This field is a sequential value, and it is not associated with a specific address group.
Name This field displays the name of each address group.
Description This field displays the description of each address group, if any.
Reference This displays the number of times an object reference is used in a profile.
IPv6 Address Group Configuration
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to be able to modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry.
#This field is a sequential value, and it is not associated with a specific address group.
Name This field displays the name of each address group.
Description This field displays the description of each address group, if any.
Reference This displays the number of times an object reference is used in a profile.

39.6.3.1 Address Group Add/Edit Screen

The Address Group Add/Edit screen allows you to create a new address group or edit an existing one. To access this screen, go to the Address Group screen (see Section 39.6.3 on page 769), and click either the Add icon or an Edit icon in the IPv4 Address Group Configuration or IPv6 Address Group Configuration section. Figure 504 IPv4/IPv6 Address Group Configuration > Add ![](images/29895da75033d125a24b3636de67828c22ffa22c326249a06fd2863b1cfba524.jpg) The following table describes the labels in this screen. Table 326 IPv4/IPv6 Address Group Configuration > Add
LABEL DESCRIPTION
Name Enter a namefor the address group. You may use 1-31 alphanumeric characters, underscores( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive.
DescriptionThis field displays the description of each address group, if any. You can use up to 60 characters, punctuation marks, and spaces.
LABEL DESCRIPTION
Address Type Selectthe type of address you want to create.
Note: The Zyxel Device automatically updates address objects that are based on an interface's IP address, subnet, or gateway if the interface's IP address settings change. For example, if you change 1's IP address, the Zyxel Device automatically updates the corresponding interface-based, LAN subnet address object.
Member ListThe Member list displays the names of the address and address group objects that have been added to the address group. The order of members is not important.Select items from the Available list that you want to be members and move them to the Member list. You can double-click a single entry to move it or use the [Shift] or [Ctrl] key to select multiple entries and use the arrow button to move them.Move any members you do not want included to the Available list.Note: Only objects of the same address type can be added to a address group.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving your changes.

39.6.4 Geo IP Summary Screen

Use this screen to update the database of country-to-IP and continent-to-IP address mappings and manually configure custom country-to-IP and continent-to-IP address mappings in geographic address objects. You can then use geographic address objects in security policies to forward or deny traffic to whole countries or regions. Click a column's heading cell to sort the table entries by that column's criteria. Click the heading cell again to reverse the sort order. Figure 505 Configuration > Object > Address/Geo IP > Geo IP ![](images/756b2ece34a5c2dfecd77a03629c9a8a164da4251c0c553e4909ded2081a7720.jpg) The following table describes the labels in this screen. Table 327 Configuration > Object > Address/Geo IP > Geo IP
LABEL DESCRIPTION
Country Database Update
Latest VersionThis is the latest country-to-IP address database version on myZyxel. You need to have a registered Content Filter Service license.
ZYXEL USGFLEX700-GB0101F - Geo IP Summary Screen - 1
Current VersionThis is the country-to-IP address database version currently on the Zyxel Device.
Update NowClick this to check for the latest country-to-IP address database version on myZyxel. The latest version is downloaded to the Zyxel Device and replaces the current version if it is newer. There are logs to show the update status. You need to have a registered Content Filter Service license.
Auto UpdateIf you want the Zyxel Device to check weekly for the latest country-to-IP address database version on myZyxel, select the checkbox, choose a day and time each week and then click Apply. The default day and time displayed is the Zyxel Device current day and time.
Custom IPv4/IPv6 to Geography Rules
IPv4/IPv6 to GeographyEnter an IP address, then click this button to query which country this IP address belongs to.
Add Click this to create a new entry.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
# This field is a sequential value, and it is not associated with a specific entry.
GeolocationThis field displays the name of the country or region that is associated with this IP address.
TypeThis field displays whether this address object is HOST, RANGE or SUBNET.
IPv4/IPv6 AddressThis field displays the IPv4/IPv6 addresses represented by the type of address object.
Region vs. Continent
RegionEnter a country name, then click the Region to Continent button to query which continent this country belongs to.
ContinentSelect a continent, then click the Region List button to query which countries belong to the continent.
ApplyClick Apply to save the changes.
ResetClick Reset to return the screen to its last-saved settings.

39.6.4.1 Add Custom IPv4/IPv6 Address to Geography Screen

This screen allows you to create a new geography-to-IP address mapping. To access this screen, go to the Geo IP screen (see Section 39.6.4 on page 771), and click the Add icon in the Custom IPv4 to Geography Rules or Custom IPv6 to Geography Rules section. Figure 506 Geo IP > Add ![](images/d45582e0339f2b21749bbbe33d659be313907cf8a7693f536654d15aea2c3b1c.jpg) The following table describes the labels in this screen. Table 328 Geo IP > Add
LABEL DESCRIPTION
Region Select the country or continent that maps to this IP address.
Address TypeSelect the type of address you want to create. Choices are:HOST, RANGE, SUBNET.
IP AddressThis field is only available if theAddress Typeis HOST. This field cannot be blank. Enter the IP address that this address object represents.
IP Starting AddressThis field is only available if theAddress Typeis RANGE. This field cannot be blank. Enter the beginning of the range of IP addresses that this address object represents.
IP Ending AddressThis field is only available if theAddress Typeis RANGE. This field cannot be blank. Enter the end of the range of IP address that this address object represents.
Network / NetmaskThese fields are only available if the IPv4Address Typeis SUBNET. They cannot be blank. Enter the network IP and subnet mask that defines the IPv4 subnet.
IPv6 Address PrefixThis field is only available if the IPv6Address Typeis SUBNET. This field cannot be blank. Enter the IPv6 address prefix that the Zyxel Device uses for the LAN IPv6 address.
OKClick OKto save your changes back to the Zyxel Device.
CancelClick Cancelto exit this screen without saving your changes.

39.7 Service Overview

Use service objects to define TCP applications, UDP applications, and ICMP messages. You can also create service groups to refer to multiple service objects in other features. - Use the Service screens (Section 39.7.2 on page 775) to view and configure the Zyxel Device's list of services and their definitions. - Use the Service Group screens (Section 39.7.2 on page 775) to view and configure the Zyxel Device's list of service groups.

39.7.1 What You Need to Know

IP Protocols

IP protocols are based on the eight-bit protocol field in the IP header. This field represents the next-level protocol that is sent in this packet. This section discusses three of the most common IP protocols. Computers use Transmission Control Protocol (TCP, IP protocol 6) and User Datagram Protocol (UDP, IP protocol 17) to exchange data with each other. TCP guarantees reliable delivery but is slower and more complex. Some uses are FTP, HTTP, SMTP, and TELNET. UDP is simpler and faster but is less reliable. Some uses are DHCP, DNS, RIP, and SNMP. TCP creates connections between computers to exchange data. Once the connection is established, the computers exchange data. If data arrives out of sequence or is missing, TCP puts it in sequence or waits for the data to be re-transmitted. Then, the connection is terminated. In contrast, computers use UDP to send short messages to each other. There is no guarantee that the messages arrive in sequence or that the messages arrive at all. Both TCP and UDP use ports to identify the source and destination. Each port is a 16-bit number. Some port numbers have been standardized and are used by low-level system processes; many others have no particular meaning. Unlike TCP and UDP, Internet Control Message Protocol (ICMP, IP protocol 1) is mainly used to send error messages or to investigate problems. For example, ICMP is used to send the response if a computer cannot be reached. Another use is ping. ICMP does not guarantee delivery, but networks often treat ICMP messages differently, sometimes looking at the message itself to decide where to send it.

Service Objects and Service Groups

Use service objects to define IP protocols. - TCP applications - UDP applications - ICMP messages - user-defined services (for other types of IP protocols) These objects are used in policy routes, security policies, and IDP profiles. Use service groups when you want to create the same rule for several services, instead of creating separate rules for each service. Service groups may consist of services and other service groups. The sequence of members in the service group is not important.

39.7.2 The Service Summary Screen

The Service summary screen provides a summary of all services and their definitions. In addition, this screen allows you to add, edit, and remove services. To access this screen, log in to the Web Configurator, and click Configuration > Object > Service > Service. Click a column's heading cell to sort the table entries by that column's criteria. Click the heading cell again to reverse the sort order. Figure 507 Configuration > Object > Service > Service ![](images/a552c6f92e18104c0f0411fc2036b4055aebb5cfcd3393385943b81430ec524e.jpg) The following table describes the labels in this screen. Table 329 Configuration > Object > Service > Service
LABEL DESCRIPTION
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to be able to modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry.
# This field is a sequential value, and it is not associated with a specific service.
Name This field displays the name of each service.
Content This field displays a description of each service.
Reference This displays the number of times an object reference is used in a profile.

39.7.2.1 The Service Add/Edit Screen

The Service Add/Edit screen allows you to create a new service or edit an existing one. To access this screen, go to the Service screen (see Section 39.7.2 on page 775), and click either the Add icon or an Edit icon. Figure 508 Configuration > Object > Service > Service > Edit ![](images/9aee129c04e1bf2951d331c7482948b6352290aa89154345b8cbed2e3e6d08f8.jpg) The following table describes the labels in this screen. Table 330 Configuration > Object > Service > Service > Edit
LABEL DESCRIPTION
NameType the name used to refer to the service. You may use 1-31 alphanumeric characters, underscores(_, or dashes (-), but the first character cannot be a number. This value is case-sensitive.
IP ProtocolSelect the protocol the service uses. Choices are: TCP, UDP, ICMP, ICMPv6, and User Defined.
Starting PortEnding PortThis field appears if the IP Protocol is TCP or UDP. Specify the port number(s) used by this service. If you fill in one of these fields, the service uses that port. If you fill in both fields, the service uses the range of ports.
ICMP TypeThis field appears if the IP Protocol is ICMP or ICMPv6.Select the ICMP message used by this service. This field displays the message text, not the message number.
IP Protocol NumberThis field appears if the IP Protocol is User Defined.Enter the number of the next-level protocol (IP protocol). Allowed values are 1 - 255.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving your changes.

39.7.3 The Service Group Summary Screen

The Service Group summary screen provides a summary of all service groups. In addition, this screen allows you to add, edit, and remove service groups. Note: If you want to access the Zyxel Device using HTTP, HTTPS, SSH, and/or, TELNET, you must add them in the Object > Service > Service Group > Default\_Allow\_WAN\_To\_ZyWALL service group, which is used in the WAN\_to\_Device security policy. To access this screen, log in to the Web Configurator, and click Configuration > Object > Service > Service Group. Figure 509 Configuration > Object > Service > Service Group ![](images/ce7913fa18428ed4a2cfd8dc6aed19fb921b44766ce883c56ad644d7d8de855d.jpg) The following table describes the labels in this screen. See Section 39.7.3.1 on page 778 for more information as well. Table 331 Configuration > Object > Service > Service Group
LABEL DESCRIPTION
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to be able to modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry.
#This field is a sequential value, and it is not associated with a specific service group.
FamilyThis field displays the Server Group supported type, which is according to your configurations in the Service Group Add/Edit screen.There are 3 types of families: :Supports IPv4 only :Supports IPv6 only :Supports both IPv4 and IPv6
Name This field displays the name of each service group.By default, the Zyxel Device uses services starting with "Default_Allow_" in the security policies to allow certain services to connect to the Zyxel Device.
Description This field displays the description of each service group, if any.
Reference This displays the number of times an object reference is used in a profile.

39.7.3.1 The Service Group Add/Edit Screen

The Service Group Add/Edit screen allows you to create a new service group or edit an existing one. To access this screen, go to the Service Group screen (see Section 39.7.3 on page 777), and click either the Add icon or an Edit icon. Figure 510 Configuration > Object > Service > Service Group > Edit ![](images/061fdfc7a6d3f35fa6c4b9f99d2c83db9e803513a67ad2da39a0da2d74b31ccd.jpg) The following table describes the labels in this screen. Table 332 Configuration > Object > Service > Service Group > Edit
LABEL DESCRIPTION
NameEnter the name of the service group. You may use 1-31 alphanumeric characters, underscores( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive.
DescriptionEnter a description of the service group, if any. You can use up to 60 printable ASCII characters.
ConfigurationThe Member list displays the names of the service and service group objects that have been added to the service group. The order of members is not important.Select items from the Available list that you want to be members and move them to the Member list. You can double-click a single entry to move it or use the [Shift] or [Ctrl] key to select multiple entries and use the arrow button to move them.Move any members you do not want included to the Available list.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving your changes.

39.8 Schedule Overview

Use schedules to set up one-time and recurring schedules for policy routes, security policies, application patrol, and content filtering. The Zyxel Device supports one-time and recurring schedules. One-time schedules are effective only once, while recurring schedules usually repeat. Both types of schedules are based on the current date and time in the Zyxel Device. Note: Schedules are based on the Zyxel Device's current date and time. - Use the Schedule summary screen (Section 39.8.2 on page 780) to see a list of all schedules in the Zyxel Device. - Use the One-Time Schedule Add/Edit screen (Section 39.8.2.1 on page 781) to create or edit a one-time schedule. - Use the Recurring Schedule Add/Edit screen (Section 39.8.2.2 on page 782) to create or edit a recurring schedule. - Use the Schedule Group screen (Section 39.8.3 on page 783) to merge individual schedule objects as one object.

39.8.1 What You Need to Know

One-time Schedules

One-time schedules begin on a specific start date and time and end on a specific stop date and time. One-time schedules are useful for long holidays and vacation periods.

Recurring Schedules

Recurring schedules begin at a specific start time and end at a specific stop time on selected days of the week (Sunday, Monday, Tuesday, Wednesday, Thursday, Friday, and Saturday). Recurring schedules always begin and end in the same day. Recurring schedules are useful for defining the workday and off-work hours.

39.8.2 The Schedule Screen

The Schedule screen provides a summary of all schedules in the Zyxel Device. To access this screen, click Configuration > Object > Schedule. Figure 511 Configuration > Object > Schedule ![](images/25a0bfe5e1c9ae1330a5ce1493e9cac02f072d911ee0f28bb2a1d8a5f5f358a6.jpg) The following table describes the labels in this screen. See Section 39.8.2.1 on page 781 and Section 39.8.2.2 on page 782 for more information as well. Table 333 Configuration > Object > Schedule
LABEL DESCRIPTION
One Time
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to be able to modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry.
#This field is a sequential value, and it is not associated with a specific schedule.
NameThis field displays the name of the schedule, which is used to refer to the schedule.
Start Day / TimeThis field displays the date and time at which the schedule begins.
Stop Day / TimeThis field displays the date and time at which the schedule ends.
Reference This displays the number of times an object reference is used in a profile.
Recurring
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to be able to modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry.
#Thisfield is a sequential value, and it is not associated with a specific schedule.
NameThis field displays the name of the schedule, which is used to refer to the schedule.
Start TimeThis field displays the time at which the schedule begins.
Stop TimeThis field displays the time at which the schedule ends.
Reference This displays the number of times an object reference is used in a profile.

39.8.2.1 The One-Time Schedule Add/Edit Screen

The One-Time Schedule Add/Edit screen allows you to define a one-time schedule or edit an existing one. To access this screen, go to the Schedule screen (see Section 39.8.2 on page 780), and click either the Add icon or an Edit icon in the One Time section. Figure 512 Configuration > Object > Schedule > Edit (One Time) ![](images/31f7462ccde5a219fdbf2a44fb07e59384279b82f115df710a320f4d5250f132.jpg) The following table describes the labels in this screen. Table 334 Configuration > Object > Schedule > Edit (One Time)
LABEL DESCRIPTION
Configuration
NameType the name used to refer to the one-time schedule. You may use 1-31 alphanumeric characters, underscores( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive.
Day Time
StartDate Specify the year, month, and day when the schedule begins.Year - 1900 - 2999Month - 1 - 12Day - 1 - 31 (it is not possible to specify illegal dates, such as February 31.)
StartTime Specify the hour and minute when the schedule begins.Hour - 0 - 23Minute - 0 - 59
StopDate Specify the year, month, and day when the schedule ends.Year - 1900 - 2999Month - 1 - 12Day - 1 - 31 (it is not possible to specify illegal dates, such as February 31.)
StopTime Specify the hour and minute when the schedule ends.Hour - 0 - 23Minute - 0 - 59
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving your changes.

39.8.2.2 The Recurring Schedule Add/Edit Screen

The Recurring Schedule Add/Edit screen allows you to define a recurring schedule or edit an existing one. To access this screen, go to the Schedule screen (see Section 39.8.2 on page 780), and click either the Add icon or an Edit icon in the Recurring section. Figure 513 Configuration > Object > Schedule > Edit (Recurring) ![](images/56cc5df73b8218e268eb8a5d774a511e96784bc1aaec7f63314e38439ae6181c.jpg) The Year, Month, and Day columns are not used in recurring schedules and are disabled in this screen. The following table describes the remaining labels in this screen. Table 335 Configuration > Object > Schedule > Edit (Recurring)
LABEL DESCRIPTION
Configuration
NameType the name used to refer to the recurring schedule. You may use 1-31 alphanumeric characters, underscores( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive.
Date Time
StartTime Specify the hour and minute when the schedule begins each day. • Hour - 0 - 23 • Minute - 0 - 59
StopTime Specify the hour and minute when the schedule ends each day. • Hour - 0 - 23 • Minute - 0 - 59
Weekly
Week Days Select each day of the week the recurring schedule is effective.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving your changes.

39.8.3 The Schedule Group Screen

The Schedule Group screen provides a summary of all groups of schedules in the Zyxel Device. To access this screen, click Configuration > Object > Schedule >Group. Figure 514 Configuration > Object > Schedule > Schedule Group ![](images/9361d6b2bae0a6d4b9fe112070fb818cb62b5f8bdaa09a2f8384e6b14d7b454b.jpg) The following table describes the fields in the above screen. Table 336 Configuration > Object > Schedule > Schedule Group
LABEL DESCRIPTION
Configuration
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to be able to modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry.
# This field is a sequential value, and it is not associated with a specific schedule.
NameThis field displays the name of the schedule group, which is used to refer to the schedule.
Description This field displays the description of the schedule group.
MembersThis field lists the members in the schedule group. Each member is separated by a comma.
Reference This displays the number of times an object reference is used in a profile.

39.8.3.1 The Schedule Group Add/Edit Screen

The Schedule Group Add/Edit screen allows you to define a schedule group or edit an existing one. To access this screen, go to the Schedule screen (see), and click either the Add icon or an Edit icon in the Schedule Group section. Figure 515 Configuration > Schedule > Schedule Group > Add ![](images/067506d28e6f6a77e754c28508a990e21d2002c1381c3d5c8d0b269fc005e375.jpg) The following table describes the fields in the above screen. Table 337 Configuration > Schedule > Schedule Group > Add
LABEL DESCRIPTION
Group Members
NameType the name used to refer to the recurring schedule. You may use 1-31 alphanumeric characters, underscores( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive.
DescriptionEnter a description of the service group, if any. You can use up to 60 printable ASCII characters.
Member ListThe Member list displays the names of the service and service group objects that have been added to the service group. The order of members is not important.Select items from the Available list that you want to be members and move them to the Member list. You can double-click a single entry to move it or use the [Shift] or [Ctrl] key to select multiple entries and use the arrow button to move them.Move any members you do not want included to the Available list.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving your changes.

39.9 AAA Server Overview

You can use a AAA (Authentication, Authorization, Accounting) server to provide access control to your network. The AAA server can be a Active Directory, LDAP, or RADIUS server. Use the AAA Server screens to create and manage objects that contain settings for using AAA servers. You use AAA server objects in configuring ext-group-user user objects and authentication method objects (see Chapter 39 on page 794).

39.9.1 Directory Service (AD/LDAP)

LDAP/AD allows a client (the Zyxel Device) to connect to a server to retrieve information from a directory. A network example is shown next. Figure 516 Example: Directory Service Client and Server ![](images/64755fe788b02b7053d6d18c804ab94401904f5fae607a9147d791854882208d.jpg)
flowchart
graph LR
    A["Database"] --> B["Processing Block"]
    B --> C["Computer 1"]
    B --> D["Computer 2"]
The following describes the user authentication procedure via an LDAP/AD server. 1 A user logs in with a user name and password pair. 2 The Zyxel Device tries to bind (or log in) to the LDAP/AD server. 3 When the binding process is successful, the Zyxel Device checks the user information in the directory against the user name and password pair. 4 If it matches, the user is allowed access. Otherwise, access is blocked.

39.9.2 RADIUS Server

RADIUS (Remote Authentication Dial-In User Service) authentication is a popular protocol used to authenticate users by means of an external server instead of (or in addition to) an internal device user database that is limited to the memory capacity of the device. In essence, RADIUS authentication allows you to validate a large number of users from a central location. Figure 517 RADIUS Server Network Example ![](images/7640b36468a38c3fdab8ba9897e7597c7b1d2331ef4acb1b5bf5b0529f6b6089.jpg)
flowchart
graph LR
    A["Server"] --> B["Data Packet"]
    B --> C["Client 1"]
    B --> D["Client 2"]

39.9.3 ASAS

ASAS (Authenex Strong Authentication System) is a RADIUS server that works with the One-Time Password (OTP) feature. Purchase a Zyxel Device OTP package in order to use this feature. The package contains server software and physical OTP tokens (PIN generators). Do the following to use OTP. See the documentation included on the ASAS' CD for details. 1 Install the ASAS server software on a computer. 2 Create user accounts on the Zyxel Device and in the ASAS server. 3 Import each token's database file (located on the included CD) into the server. 4 Assign users to OTP tokens (on the ASAS server). 5 Configure the ASAS as a RADIUS server in the Zyxel Device's Configuration > Object > AAA Server screens. 6 Give the OTP tokens to (local or remote) users. \- Use the Configuration > Object > AAA Server > Active Directory (or LDAP) screens (Section 39.9.5 on page 787) to configure Active Directory or LDAP server objects. \- Use the Configuration > Object > AAA Server > RADIUS screen (Section 39.9.2 on page 785) to configure the default external RADIUS server to use for user authentication.

39.9.4 What You Need To Know

AAA Servers Supported by the Zyxel Device

The following lists the types of authentication server the Zyxel Device supports. \- Local user database The Zyxel Device uses the built-in local user database to authenticate administrative users logging into the Zyxel Device's Web Configurator or network access users logging into the network through the Zyxel Device. You can also use the local user database to authenticate VPN users. \- Directory Service (LDAP/AD) LDAP (Lightweight Directory Access Protocol)/AD (Active Directory) is a directory service that is both a directory and a protocol for controlling access to a network. The directory consists of a database specialized for fast information retrieval and filtering activities. You create and store user profile and login information on the external server. • RADIUS RADIUS (Remote Authentication Dial-In User Service) authentication is a popular protocol used to authenticate users by means of an external or built-in RADIUS server. RADIUS authentication allows you to validate a large number of users from a central location.

Directory Structure

The directory entries are arranged in a hierarchical order much like a tree structure. Normally, the directory structure reflects the geographical or organizational boundaries. The following figure shows a basic directory structure branching from countries to organizations to organizational units to individuals. Figure 518 Basic Directory Structure ![](images/09cb989ee2340571721294f35f6a1eeecd58b8eee7c68ced72fbb3ee4b854774.jpg)
flowchart
graph TD
    A["Root"] --> B["US"]
    A --> C["Japan"]
    B --> D["Sprint"]
    B --> E["UPS"]
    B --> F["NEC"]
    D --> G["Sales"]
    D --> H["RD3"]
    E --> I["QA"]
    E --> J["CSO"]
    F --> K["Sales"]
    F --> L["RD"]
    G --> M["Unique Common Name (cn)"]
    H --> M
    I --> M
    J --> M
    K --> M
    L --> M

Distinguished Name (DN)

A DN uniquely identifies an entry in a directory. A DN consists of attribute-value pairs separated by commas. The leftmost attribute is the Relative Distinguished Name (RDN). This provides a unique name for entries that have the same "parent DN" ("cn=domain1.com, ou=Sales, o=MyCompany" in the following examples).
cn=domain1.com, ou = Sales, o=MyCompany, c=US
cn=domain1.com, ou = Sales, o=MyCompany, c=JP 

Base DN

A base DN specifies a directory. A base DN usually contains information such as the name of an organization, a domain name and/or country. For example, o=MyCompany, c=UK where o means organization and c means country.

Bind DN

A bind DN is used to authenticate with an LDAP/AD server. For example a bind DN of cn=zywallAdmin allows the Zyxel Device to log into the LDAP/AD server using the user name of zywallAdmin. The bind DN is used in conjunction with a bind password. When a bind DN is not specified, the Zyxel Device will try to log in as an anonymous user. If the bind password is incorrect, the login will fail.

39.9.5 Active Directory or LDAP Server Summary

Use the Active Directory or LDAP screen to manage the list of AD or LDAP servers the Zyxel Device can use in authenticating users. Click Configuration > Object > AAA Server > Active Directory (or LDAP) to display the Active Directory (or LDAP) screen. Figure 519 Configuration > Object > AAA Server > Active Directory (or LDAP) ![](images/289cb87a63ca62b081a5ddefd904ea598760ecdb527e2680040e599bc2c92205.jpg) The following table describes the labels in this screen. Table 338 Configuration > Object > AAA Server > Active Directory (or LDAP)
LABEL DESCRIPTION
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry.
#This field is a sequential value, and it is not associated with a specific AD or LDAP server.
Name This field displays the name of the Active Directory.
Server Address This is the address of the AD or LDAP server.
Base DNThis specifies a directory. For example, o=Zyxel, c=US.

39.9.5.1 Adding an Active Directory or LDAP Server

Click Object > AAA Server > Active Directory (or LDAP) to display the Active Directory (or LDAP) screen. Click the Add icon or an Edit icon to display the following screen. Use this screen to create a new AD or LDAP entry or edit an existing one. Figure 520 Configuration > Object > AAA Server > Active Directory (or LDAP) > Add ![](images/9b51b34a003248571092c27d0699126a92a40b793b11c8280d475a4c14485bbe.jpg) The following table describes the labels in this screen. Table 339 Configuration > Object > AAA Server > Active Directory (or LDAP) > Add
LABEL DESCRIPTION
NameEnter a descriptive name (up to 63 alphanumeric characters) for identification purposes.
DescriptionEnter the description of each server, if any. You can use up to 60 printable ASCII characters.
Server Address Enterthe address of the AD or LDAP server.
Backup Server AddressIf the AD or LDAP server has a backup server, enter its address here.
PortSpecify the port number on the AD or LDAP server to which the Zyxel Device sends authentication requests. Enter a number between 1 and 65535.This port number should be the same on all AD or LDAP server(s) in this group.
Base DNSpecify the directory (up to 127 alphanumerical characters). For example, o=Zyxel, c=US.This is only for LDAP.
Use SSLSelect Use SSL to establish a secure connection to the AD or LDAP server(s).
Search time limitSpecify the timeout period (between 1 and 300 seconds) before the Zyxel Device disconnects from the AD or LDAP server. In this case, user authentication fails.Search timeout occurs when either the user information is not in the AD or LDAP server(s) or the AD or LDAP server(s) is down.
Case-sensitive User NamesSelect this if the server checks the case of the usernames.
Bind DNSpecify the bind DN for logging into the AD or LDAP server. Enter up to 127 alphanumerical characters.For example, cn=zywallAdmin specifies zywallAdmin as the user name.
PasswordIf required, enter the password (up to 15 alphanumerical characters) for the Zyxel Device to bind (or log in) to the AD or LDAP server.
Retype to Confirm RRetype your new password for confirmation.
Login Name AttributeEnter the type of identifier the users are to use to log in. For example "name" or "email address".
Alternative Login Name AttributeIf there is a second type of identifier that the users can use to log in, enter it here. For example "name" or "email address".
Group Membership AttributeAn AD or LDAP server defines attributes for its accounts. Enter the name of the attribute that the Zyxel Device is to check to determine to which group a user belongs. The value for this attribute is called a group identifier; it determines to which group a user belongs. You can add ext-group-user user objects to identify groups based on these group identifier values.For example you could have an attribute named "memberOf" with values like "sales", "RD", and "management". Then you could also create a ext-group-user user object for each group. One with "sales" as the group identifier, another for "RD" and a third for "management".
Domain Authentication for MSChapSelect the Enable checkbox to enable domain authentication for MSChap.This is only for Active Directory.
User NameEnter the user name for the user who has rights to add a machine to the domain.This is only for Active Directory.
User PasswordEnter the password for the associated user name.This is only for Active Directory.
Retype to Confirm RRetype your new password for confirmation.This is only for Active Directory.
Realm Enter the realm FQDN.m FQDN.This is only for Active Directory.
NetBIOS NameType the NetBIOS name. This field is optional. NetBIOS packets are TCP or UDP packets that enable a computer to connect to and communicate with a LAN which allows local computers to find computers on the remote network and vice versa.
Configuration ValidationUse a user account from the server specified above to test if the configuration is correct. Enter the account's user name in theUsernamefield and clickTest.
OK Click OK to savethe changes.
CancelClick Cancelto discard the changes.

39.9.6 RADIUS Server Summary

Use the RADIUS screen to manage the list of RADIUS servers the Zyxel Device can use in authenticating users. Click Configuration > Object > AAA Server > RADIUS to display the RADIUS screen. Figure 521 Configuration > Object > AAA Server > RADIUS ![](images/0f07dffb1f215d48904510c685b61fb1d25b3cf5348ea8e5eb694a331972a649.jpg) The following table describes the labels in this screen. Table 340 Configuration > Object > AAA Server > RADIUS
LABEL DESCRIPTION
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry.
# This field displays the index number.
Name This is the name of the RADIUS server entry.
Server Address This is the address of the AD or LDAP server.

39.9.6.1 Adding a RADIUS Server

Click Configuration > Object > AAA Server > RADIUS to display the RADIUS screen. Click the Add icon or an Edit icon to display the following screen. Use this screen to create a new AD or LDAP entry or edit an existing one. Figure 522 Configuration > Object > AAA Server > RADIUS > Add ![](images/8f2361ac35802d465170bd57212b3079eaaf3dcf2c53fa21d158f4ef0fdcf208.jpg) The following table describes the labels in this screen. Table 341 Configuration > Object > AAA Server > RADIUS > Add
LABEL DESCRIPTION
NameEnter a descriptive name (up to 63 alphanumeric characters) for identification purposes.
DescriptionEnter the description of each server, if any. You can use up to 60 printable ASCII characters.
Server Address Enter the address of the RADIUS server.
Authentication PortSpecify the port number on the RADIUS server to which the Zyxel Device sends authentication requests. Enter a number between 1 and 65535.
Backup Server AddressIf the RADIUS server has a backup server, enter its address here.
Backup Authentication PortSpecify the port number on the RADIUS server to which the Zyxel Device sends authentication requests. Enter a number between 1 and 65535.
KeyEnter a password (up to 15 alphanumeric characters) as the key to be shared between the external authentication server and the Zyxel Device.The key is not sent over the network. This key must be the same on the external authentication server and the Zyxel Device.
Change of AuthorizationThe external RADIUS server can change its authentication policy and send CoA (Change of Authorization) or RADIUS Disconnect messages in order to terminate the subscriber's service.Select this option to allow the Zyxel Device to disconnect wireless clients based on the information (such as client's user name and MAC address) specified in CoA or RADIUS Disconnect messages sent by the RADIUS server.
Server AddressEnter the IP address or Fully-Qualified Domain Name (FQDN) of the RADIUS accounting server.
Accounting PortSpecify the port number on the RADIUS server to which the Zyxel Device sends accounting information. Enter a number between 1 and 65535.
Backup Server AddressIf the RADIUS server has a backup accounting server, enter its address here.
Backup Accounting PortSpecify the port number on the RADIUS server to which the Zyxel Device sends accounting information. Enter a number between 1 and 65535.
KeyEnter a password (up to 15 alphanumeric characters) as the key to be shared between the external authentication server and the Zyxel Device.The key is not sent over the network. This key must be the same on the external authentication server and the Zyxel Device.
Maximum Retry CountAt times the Zyxel Device may not be able to use the primary RADIUS accounting server.Specify the number of times the Zyxel Device should reattempt to use the primary RADIUS server before attempting to use the secondary RADIUS server. This also sets how many times the Zyxel Device will attempt to use the secondary RADIUS server.For example, you set this field to 3. If the Zyxel Device does not get a response from the primary RADIUS server, it tries again up to three times. If there is no response, the Zyxel Device tries the secondary RADIUS server up to three times.If there is also no response from the secondary RADIUS server, the Zyxel Device stops attempting to authenticate the subscriber. The subscriber will see a message that says the RADIUS server was not found.
Enable Accounting Interim UpdateThis field is configurable only after you configure a RADIUS accounting server address. Select this to have the Zyxel Device send subscriber status updates to the RADIUS server at the interval you specify.
Interim IntervalSpecify the time interval for how often the Zyxel Device is to send a subscriber status update to the RADIUS server.
TimeoutSpecify the timeout period (between 1 and 300 seconds) before the Zyxel Device disconnects from the RADIUS server. In this case, user authentication fails.Search timeout occurs when either the user information is not in the RADIUS server or the RADIUS server is down.
NAS IP Address Typethe IP address of the NAS (Network Access Server).
NAS IdentifierIf the RADIUS server requires the Zyxel Device to provide the Network Access Server identifier attribute with a specific value, enter it here.
Case-sensitive User NamesSelect this if you want configure your username as case-sensitive.
Group Membership AttributeA RADIUS server defines attributes for its accounts. Select the name and number of the attribute that the Zyxel Device is to check to determine to which group a user belongs. If it does not display, select user-defined and specify the attribute's number.This attribute’s value is called a group identifier; it determines to which group a user belongs. You can addext-group-useruser objects to identify groups based on these group identifier values.For example you could have an attribute named “memberOf” with values like “sales”, “RD”, and “management”. Then you could also create aext-group-useruser object for each group. One with “sales” as the group identifier, another for “RD” and a third for “management”.
OK Click OK to save the changes.
CancelClick Cancelto discard the changes.

39.10 Auth. Method Overview

Authentication method objects set how the Zyxel Device authenticates wireless, HTTP/HTTPS clients, and peer IPSec routers (extended authentication) clients. Configure authentication method objects to have the Zyxel Device use the local user database, and/or the authentication servers and authentication server groups specified by AAA server objects. By default, user accounts created and stored on the Zyxel Device are authenticated locally. - Use the Configuration > Object > Auth. Method screens (Section 39.10.3 on page 795) to create and manage authentication method objects. - Use the Configuration > Object > Auth. Method > Two-Factor Authentication screen (Section 39.10.4 on page 797) to configure double-layer security to access a secured network behind the Zyxel Device via a VPN tunnel, or access the Zyxel Device using Web Configurator, SSH, or Telnet.

39.10.1 Before You Begin

Configure AAA server objects before you configure authentication method objects.

39.10.2 Example: Selecting a VPN Authentication Method

After you set up an authentication method object in the Auth. Method screens, you can use it in the VPN Gateway screen to authenticate VPN users for establishing a VPN connection. Refer to the chapter on VPN for more information. Follow the steps below to specify the authentication method for a VPN connection. 1 Access the Configuration > VPN > IPSec VPN > VPN Gateway > Edit screen. 2 Click Show Advance Setting and select Enable Extended Authentication. 3 Select Server Mode and select an authentication method object from the drop-down list box. 4 Click OK to save the settings. Figure 523 Example: Using Authentication Method in VPN ![](images/5b69688e69d92321cab20a8c33f2dad46778a36c3467914be235927c6841c215.jpg)

39.10.3 Authentication Method Objects

Click Configuration > Object > Auth. Method to display the screen as shown. Note: You can create up to 16 authentication method objects. Figure 524 Configuration > Object > Auth. Method ![](images/3838411592e4203cfb651aec34d28a2f237e941e85070f02389a23bb2960a7bb.jpg) The following table describes the labels in this screen. Table 342 Configuration > Object > Auth. Method
LABEL DESCRIPTION
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry.
# This field displays the index number.
Method Name This field displays a descriptive name for identification purposes.
Method ListThis field displays the authentication method(s) for this entry.

39.10.3.1 Creating an Authentication Method Object

Follow the steps below to create an authentication method object. 1 Click Configuration > Object > Auth. Method. 2 Click Add. 3 Specify a descriptive name for identification purposes in the Name field. You may use 1-31 alphanumeric characters, underscores(\_, or dashes (-), but the first character cannot be a number. This value is case-sensitive. For example, "My\_Device". 4 Click Add to insert an authentication method in the table. 5 Select a server object from the Method List drop-down list box. 6 You can add up to four server objects to the table. The ordering of the Method List column is important. The Zyxel Device authenticates the users using the databases (in the local user database or the external authentication server) in the order they appear in this screen. If two accounts with the same username exist on two authentication servers you specify, the Zyxel Device does not continue the search on the second authentication server when you enter the username and password that doesn't match the one on the first authentication server. Note: You can NOT select two server objects of the same type. 7 Click OK to save the settings or click Cancel to discard all changes and return to the previous screen. Figure 525 Configuration > Object > Auth. Method > Add ![](images/29908c98bdf83a9076e4f08f8f6e51ba4b6256ff1c533df622d7da54ee589cb0.jpg) The following table describes the labels in this screen. Table 343 Configuration > Object > Auth. Method > Add
LABEL DESCRIPTION
Name Specify a descriptive name for identification purposes.
You may use 1-31 alphanumeric characters, underscores(_, or dashes (-), but the first character cannot be a number. This value is case-sensitive. For example, "My_Device".
AddClick this to create a new entry. Select an entry and click Add to create a new entry after the selected entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
MoveTo change a method's position in the numbered list, select the method and click Move to display a field to type a number for where you want to put it and press [ENTER] to move the rule to the number that you typed.The ordering of your methods is important as Zyxel Device authenticates the users using the authentication methods in the order they appear in this screen.
# This field displays the index number.
Method ListSelect a server object from the drop-down list box. You can create a server object in the AAA Server screen.The Zyxel Device authenticates the users using the databases (in the local user database or the external authentication server) in the order they appear in this screen.If two accounts with the same username exist on two authentication servers you specify, the Zyxel Device does not continue the search on the second authentication server when you enter the username and password that doesn't match the one on the first authentication server.
OK Click OK to save the changes.
CancelClick Cancel to discard the changes.

39.10.4 Two-Factor Authentication

Use two-factor authentication to have double-layer security to access a secured network behind the Zyxel Device via a VPN tunnel, Web Configurator, SSH, or Telnet. The first layer is the VPN client/Zyxel Device's login user name / password and the second layer is an authorized SMS (via mobile phone number) or email address.

39.10.4.1 Overview

This section introduces how two-factor authentication works. Figure 526 Two-Factor Authentication ![](images/22150baa0cf0e0e45b393614e1e4c2f6e785e0ad59700f18229b2d036fd20196.jpg)
flowchart
graph TD
    A["Email-to-SMS"] -->|6| B["Switch"]
    C["Client 1"] -->|2| B
    D["Client 2"] -->|3| B
    E["Client 3"] -->|4| B
    F["Client 4"] -->|5| B
    G["Client 5"] -->|7| H["Secured Network"]
    I["Client 6"] -->|1| B
Active Directory

VPN Access Via a VPN tunnel

1 A user runs a VPN client and logs in with the user name and password for this VPN tunnel. 2 The VPN client connects to the Zyxel Device and authenticates using the specified username and password. 3 The Zyxel Device requests the user's user-name, password and mobile phone number or email address from the Active Directory, RADIUS server or local Zyxel Device database in order to authenticate this user (factor 1). If they are not found, then the Zyxel Device terminates the connection. 4 If all correct credentials are found, then the Zyxel Device performs one of the following actions: - Emails an authorization link to the admin user - Requests that the Email-to-SMS cloud system send an SMS with the authorization link 5 The client must open the authorization link or enter the authorization code within a specified deadline (Valid Time). 6 If the authorization is correct and received on time, then the client can access the secured network through the VPN tunnel. If the authorization deadline has expired, then the client has to log into the Zyxel Device again. If authorization credentials are incorrect or if the SMS/email was not received, then the client should contact the network administrator.

Admin Access Via the Web Configurator, SSH, or Telnet

1 An admin user connects to the Zyxel Device through the Web Configurator, SSH, or Telnet. 2 The Zyxel Device requests the admin user's user-name, password and mobile phone number or email address from the Active Directory, RADIUS server or local Zyxel Device database in order to authenticate this admin user. 3 If all correct credentials are found, then the Zyxel Device performs one of the following actions: - Requests the Google Authenticator code - Emails an authorization link or code to the admin user - Requests that the Email-to-SMS cloud system send an SMS with an authorization link or code 4 The admin user must open the authorization link or enter the authorization code within a specified deadline (Valid Time). 5 If the authorization is correct and received on time, then the admin user can log into Zyxel Device. If the authorization deadline has expired, then the admin user has to log in again. If authorization credentials are incorrect code was received, then the admin user should contact the network administrator.

39.10.4.2 Pre-configuration

Before configuration, you must: - Set up the user's user-name, password and email address or mobile number in the Active Directory, RADIUS server or local Zyxel Device database - Enable Two-factor Authentication in Object > User/Group > User > Edit > Two-factor Authentication for a specific user - Enable Two-factor Authentication in Object > Auth. Method > Two-factor Authentication for the Zyxel Device - Enable HTTP and/or HTTPS in System > WWW > Service Control - Enable SSH and/or Telnet in System > SSH and/or System > TELNET - Add HTTP, HTTPS, SSH, and/or, TELNET in the Object > Service > Service Group > Default\_Allow\_WAN\_To\_ZyWALL service group. This service group defines the default services allowed in the WAN\_to\_Device security policy. - For VPN access, configure the VPN tunnel for this user on the Zyxel Device

Email Authentication

\- Configure Mail Server in System > Notification > Mail Server.

SMS Authentication

- Configure Mail Server in System > Notification > Mail Server. - Configure SMS in System > Notification > SMS. - Have an account with an Email-to-SMS cloud provider to be able to send SMS authorization requests

Google Authentication

• Install Google Authenticator Two-Factor authentication will fail under the following conditions: - You omit any of the pre-configuration items. Make sure to perform all pre-configuration items. - The user cannot receive the authorization SMS or email. Make sure the mobile telephone number or email address of the user in the Active Directory, RADIUS Server or local Zyxel Device database is configured correctly. - Email-to-SMS cloud system authentication fails. Make sure that SMS is enabled and credentials are correct in System > Notification > SMS. \- Mail server authentication fails. Make sure the System > Notification > Mail Server settings are correct. \- Authorization times out. Extend the Valid Time in Configuration > Object > Auth. Method > Two-factor Authentication > VPN Access. \- You are unable to access Google Authenticator (you lost your phone or uninstalled the app). Log in using one of the backup codes. \- You get a Google Authenticator verification error. You must enter the code within the time displayed in Google Authenticator. The time on your cellphone and the time on the Zyxel Device must be the same.

39.10.5 Two-Factor Authentication VPN Access

Use this screen to select the users and VPN services that requires two-factor authentication. Go to Configuration > Object > Auth. Method > Two-factor Authentication > VPN Access and configure the following screen as shown. Figure 527 Configuration > Object > Auth. Method > Two-factor Authentication > VPN Access ![](images/5075b12da4f2666155140acf05fee535622c53ca9d625f452a4b17628e2f7021.jpg) The following table describes the labels in this screen. Table 344 Configuration > Object > Auth. Method > Two-factor Authentication > VPN Access
LABEL DESCRIPTION
General Settings
EnableSelect the check box to require double-layer security to access a secured network behind the Zyxel Device via a VPN tunnel.
Valid TimeEnter the maximum time (in minutes) that the user must click or tap the authorization link in the SMS or email in order to get authorization for the VPN connection.
Two-factor Authentication for Services:Select which kinds of VPN tunnels require Two-Factor Authentication. You should have configured the VPN tunnel first.• SSL VPN Access• IPSec VPN Access• L2TP/IPSec VPN Access
Table 344 Configuration > Object > Auth. Method > Two-factor Authentication > VPN
LABEL DESCRIPTION
User/GroupThis list displays the names of the users and user groups that can be selected for two-factor authentication. The order of members is not important. Select users and groups from the Selectable User/ Group Objects list that require two-factor authentication for VPN access to a secured network behind the Zyxel Device and move them to the Selected User/ Group Objects list. You can double-click a single entry to move it or use the [Shift] or [Ctrl] key to select multiple entries and use the arrow button to move them.Similarly, move user/groups that do not you do not require two-factor authentication back to the Selectable User/ Group Objects list.
Delivery SettingsUse this section to configure how to send an SMS or email for authorization.
Deliver Authorize Link Method:Select one or both methods:SMS: Object > User/ Group > User must contain a valid mobile telephone number. A valid mobile telephone number can be up to 20 characters in length, including the numbers 1~9 and the following characters in the square brackets [+*#()-].Email: Object > User/ Group > User must contain a valid email address. A valid email address must contain the @ character. For example, this is a valid email address: abc@example.com
Authorize Link URL Address:Configure the link that the user will receive in the SMS or email. The user must be able to access the link.http/https: you must enable HTTP or HTTPS in System > WWW > Service ControlFrom Interface/User-Defined: select the Zyxel Device WAN interface (wan1/2) or select User-Defined and then enter an IP address.
MessageYou can either create a default message in the text box or upload a message file (Use Multilingual file) from your computer. The message file must be named '2FA-msg.txt' and be in UTF-8 format. To create the file, click Download the default 2FA-msg.txt example and edit the file for your needs. (If you make a mistake, use Restore Customized File to Default to restore your customized file to the default.) Use Select a File Path to locate the final file on your computer and then click Upload to transfer it to the Zyxel Device.The message in either the text box or the file must contain thevariable within angle brackets, while, , andvariables are optional.
ApplyClick Apply to save the changes.
ResetClick Reset to return the screen to its last-saved settings.

39.10.6 Two-Factor Authentication Admin Access

Use this screen to select the service (Web, SSH, and TELNET) that requires two-factor authentication for the admin user. Go to Configuration > Object > Auth. Method > Two-factor Authentication > Admin Access and configure the following screen as shown. Figure 528 Configuration > Object > Auth. Method > Two-factor Authentication > Admin Access ![](images/926a791556ab10d28af3f92b6b08ce3a686ff29d491fa0289c4b27000658b1b3.jpg) The following table describes the labels in this screen. Table 345 Configuration > Object > Auth. Method > Two-factor Authentication > Admin Access
LABEL DESCRIPTION
General Settings
EnableSelect the check box to require double-layer security to access a secured network behind the Zyxel Device via the Web Configurator, SSH, or Telnet.
Valid TimeEnter the maximum time (in minutes) that the user must click or tap the authorization link in the SMS or email in order to get authorization for logins via the Web Configurator, SSH, or Telnet.
Two-factor Authentication for Services:Select which services require Two-Factor Authentication for the admin user.·Web·SSH·TELNET
Delivery SettingsUse this section to configure how to send an SMS or email for authorization.
Verification Code Delivery MethodSelect one or both (All) methods:·SMS: Object >User/Group >User must contain a valid mobile telephone number. A valid mobile telephone number can be up to 20 characters in length, including the numbers 1~9 and the following characters in the square brackets [+#()-].·Email: Object >User/Group >User must contain a valid email address. A valid email address must contain the @ character. For example, this is a valid email address: abc@example.com
ApplyClick Apply to save the changes.
ResetClick Reset to return the screen to its last-saved settings.

39.11 Certificate Overview

The Zyxel Device can use certificates (also called digital IDs) to authenticate users. Certificates are based on public-private key pairs. A certificate contains the certificate owner's identity and public key. Certificates provide a way to exchange public keys for use in authentication. \- Use the My Certificates screens (see Section 39.11.3 on page 805 to Section 39.11.3.3 on page 813) to generate and export self-signed certificates or certification requests and import the CA-signed certificates. \- Use the Trusted Certificates screens (see Section 39.11.4 on page 814 to Section 39.11.4.2 on page 818) to save CA certificates and trusted remote host certificates to the Zyxel Device. The Zyxel Device trusts any valid certificate that you have imported as a trusted certificate. It also trusts any valid certificate signed by any of the certificates that you have imported as a trusted certificate.

39.11.1 What You Need to Know

When using public-key cryptology for authentication, each host has two keys. One key is public and can be made openly available. The other key is private and must be kept secure. These keys work like a handwritten signature (in fact, certificates are often referred to as “digital signatures”). Only you can write your signature exactly as it should look. When people know what your signature looks like, they can verify whether something was signed by you, or by someone else. In the same way, your private key “writes” your digital signature and your public key allows people to verify whether data was signed by you, or by someone else. This process works as follows. 1 Tim wants to send a message to Jenny. He needs her to be sure that it comes from him, and that the message content has not been altered by anyone else along the way. Tim generates a public key pair (one public key and one private key). 2 Tim keeps the private key and makes the public key openly available. This means that anyone who receives a message seeming to come from Tim can read it and verify whether it is really from him or not. 3 Tim uses his private key to sign the message and sends it to Jenny. 4 Jenny receives the message and uses Tim's public key to verify it. Jenny knows that the message is from Tim, and that although other people may have been able to read the message, no-one can have altered it (because they cannot re-sign the message with Tim's private key). 5 Additionally, Jenny uses her own private key to sign a message and Tim uses Jenny's public key to verify the message. The Zyxel Device uses certificates based on public-key cryptology to authenticate users attempting to establish a connection, not to encrypt the data that you send after establishing a connection. The method used to secure the data that you send through an established connection depends on the type of connection. For example, a VPN tunnel might use the triple DES encryption algorithm. The certification authority uses its private key to sign certificates. Anyone can then use the certification authority's public key to verify the certificates. A certification path is the hierarchy of certification authority certificates that validate a certificate. The Zyxel Device does not trust a certificate if any certificate on its path has expired or been revoked. Certification authorities maintain directory servers with databases of valid and revoked certificates. A directory of certificates that have been revoked before the scheduled expiration is called a CRL (Certificate Revocation List). The Zyxel Device can check a peer's certificate against a directory server's list of revoked certificates. The framework of servers, software, procedures and policies that handles keys is called PKI (public-key infrastructure).

Advantages of Certificates

Certificates offer the following benefits. - The Zyxel Device only has to store the certificates of the certification authorities that you decide to trust, no matter how many devices you need to authenticate. - Key distribution is simple and very secure since you can freely distribute public keys and you never need to transmit private keys.

Self-signed Certificates

You can have the Zyxel Device act as a certification authority and sign its own certificates.

Factory Default Certificate

The Zyxel Device generates its own unique self-signed certificate when you first turn it on. This certificate is referred to in the GUI as the factory default certificate.

Certificate File Formats

Any certificate that you want to import has to be in one of these file formats: - Binary X.509: This is an ITU-T recommendation that defines the formats for X.509 certificates. - PEM (Base-64) encoded X.509: This Privacy Enhanced Mail format uses lowercase letters, uppercase letters and numerals to convert a binary X.509 certificate into a printable form. - Binary PKCS#7: This is a standard that defines the general syntax for data (including digital signatures) that may be encrypted. A PKCS #7 file is used to transfer a public key certificate. The private key is not included. The Zyxel Device currently allows the importation of a PKS#7 file that contains a single certificate. - PEM (Base-64) encoded PKCS#7: This Privacy Enhanced Mail (PEM) format uses lowercase letters, uppercase letters and numerals to convert a binary PKCS#7 certificate into a printable form. - Binary PKCS#12: This is a format for transferring public key and private key certificates. The private key in a PKCS #12 file is within a password-encrypted envelope. The file's password is not connected to your certificate's public or private passwords. Exporting a PKCS #12 file creates this and you must provide it to decrypt the contents when you import the file into the Zyxel Device. Note: Be careful not to convert a binary file to text during the transfer process. It is easy for this to occur since many programs use text files by default.

39.11.2 Verifying a Certificate

Before you import a trusted certificate into the Zyxel Device, you should verify that you have the correct certificate. You can do this using the certificate's fingerprint. A certificate's fingerprint is a message digest calculated using the MD5 or SHA1 algorithm. The following procedure describes how to check a certificate's fingerprint to verify that you have the actual certificate. 1 Browse to where you have the certificate saved on your computer. 2 Make sure that the certificate has a “.cer” or “.crt” file name extension. Figure 529 Remote Host Certificates ![](images/c7e5d4e6f4de8ff46ac060c55dac9846f972e6ed7c701493211078b7542a0cfb.jpg) 3 Double-click the certificate's icon to open the Certificate window. Click the Details tab and scroll down to the Thumbprint Algorithm and Thumbprint fields. Figure 530 Certificate Details ![](images/507629c32e73353eda27077917936e77a936c88bd6b638f5190137963c10a544.jpg) 4 Use a secure method to verify that the certificate owner has the same information in the Thumbprint Algorithm and Thumbprint fields. The secure method may very based on your situation. Possible examples would be over the telephone or through an HTTPS connection.

39.11.3 The My Certificates Screen

Click Configuration > Object > Certificate > My Certificates to open the My Certificates screen. This is the Zyxel Device's summary list of certificates and certification requests. Figure 531 Configuration > Object > Certificate > My Certificates ![](images/032727dc4e29211e6b9a7dfa8b3fc5111445254609a610670d8833523829f93f.jpg) The following table describes the labels in this screen. Table 346 Configuration > Object > Certificate > My Certificates
LABEL DESCRIPTION
PKI Storage Space in UseThis bar displays the percentage of the Zyxel Device's PKI storage space that is currently in use. When the storage space is almost full, you should consider deleting expired or unnecessary certificates before adding more certificates.
AddClick this to go to the screen where you can have the Zyxel Device generate a certificate or a certification request.
EditDouble-click an entry or select it and click Edit to open a screen with an in-depth list of information about the certificate.
RemoveThe Zyxel Device keeps all of your certificates unless you specifically delete them. Uploading a new firmware or default configuration file does not delete your certificates. To remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so. Subsequent certificates move up by one when you take this action.
ReferencesYou cannot delete certificates that any of the Zyxel Device's features are configured to use. Select an entry and click References to open a screen that shows which settings use the entry.
Download Click thisand the following screen will appear.Type the selected certificate's password and save the selected certificate to your computer.Figure 532 Download a Certificate
LABEL DESCRIPTION
EmailClick this to email the selected certificate to the configured email address(es) for SSL connection establishment. This enables you to establish an SSL connection on your laptops, tablets, or smartphones.Click this and the following screen will appear.Here are the field descriptions:Mail Subject: Type the subject line for outgoing email from the Zyxel Device.Mail To: Type the email address (or addresses) to which the outgoing email is delivered.Send Certificate with Private Key: Select the check box to send the selected certificate with a private key.Password: Enter a private key of up to 31 keyboard characters for the certificate. The special characters listed in the brackets [:\ | `~!@#%^&*()_+\\':.../<>=-'] are allowed.E-mail Content: Create the email content in English, and use up to 250 keyboard characters. The special characters listed in the brackets [: | `~!@#%^&*()_+\\{':.../<>=-'] are allowed.Compress as a ZIP File: Select the check box to compress the selected certificate.Make sure the endpoint devices can decompress ZIP files before sending the compressed certificate.It's recommended to compress the certificate with a private key. Some email servers block PKCS #12 files.Send Email: Click this to send the selected certificate.Cancel: Click this to return to the previous screen without saving your changes.Figure 533 Email My Certificate
#This field displays the certificate index number. The certificates are listed in alphabetical order.
NameThis field displays the name used to identify this certificate. It is recommended that you give each certificate a unique name.
Type This field displays what kind of certificate this is.REQ represents a certification request and is not yet a valid certificate. Send a certification request to a certification authority, which then issues a certificate. Use the My Certificate Import screen to import the certificate and replace the request.SELF represents a self-signed certificate.CERT represents a certificate issued by a certification authority.
SubjectThis field displays identifying information about the certificate's owner, such as CN (Common Name), OU (Organizational Unit or department), O (Organization or company) and C (Country). It is recommended that each certificate have unique subject information.
IssuerThis field displays identifying information about the certificate's issuing certification authority, such as a common name, organizational unit or department, organization or company and country. With self-signed certificates, this is the same information as in the Subject field.
Valid From This fielddisplays the date that the certificate becomes applicable.
Valid ToThis field displays the date that the certificate expires. The text displays in red and includes an Expired! message if the certificate has expired.
ImportClick Import to open a screen where you can save a certificate to the Zyxel Device.
RefreshClick Refresh to display the current validity status of the certificates.

39.11.3.1 The My Certificates Add Screen

Click Configuration > Object > Certificate > My Certificates and then the Add icon to open the My Certificates Add screen. Use this screen to have the Zyxel Device create a self-signed certificate, enroll a certificate with a certification authority or generate a certification request. Figure 534 Configuration > Object > Certificate > My Certificates > Add ![](images/aec973ca7167cb5dfb0795225826ae2a8af5660f52f0297249cbd0e222cc4f1f.jpg) The following table describes the labels in this screen. Table 347 Configuration > Object > Certificate > My Certificates > Add
LABEL DESCRIPTION
NameType a name to identify this certificate. You can use up to 31 alphanumeric and:'~!@#$%^&()_+[]'}.=- characters.
Subject InformationUse these fields to record information that identifies the owner of the certificate. You do not have to fill in every field, although you must specify a Host IP Address, Host IPv6Address, Host Domain Name, or E-Mail. The certification authority may add fields (such as a serial number) to the subject information when it issues a certificate. It is recommended that each certificate have unique subject information.Select a radio button to identify the certificate's owner by IP address, domain name or email address. Type the IP address (in dotted decimal notation), domain name or email address in the field provided. The domain name or email address is for identification purposes only and can be any string.A domain name can be up to 255 characters. You can use alphanumeric characters, the hyphen and periods.An email address can be up to 63 characters. You can use alphanumeric characters, the hyphen, the @ symbol, periods and the underscore.
Organizational UnitIdentify the organizational unit or department to which the certificate owner belongs. You can use up to 31 characters. You can use alphanumeric characters, the hyphen and the underscore.
OrganizationIdentify the company or group to which the certificate owner belongs. You can use up to 31 characters. You can use alphanumeric characters, the hyphen and the underscore.
Town (City)Identify the town or city where the certificate owner is located. You can use up to 31 characters. You can use alphanumeric characters, the hyphen and the underscore.
State, (Province)Identify the state or province where the certificate owner is located. You can use up to 31 characters. You can use alphanumeric characters, the hyphen and the underscore.
CountryEnter a two-letter country code to Identify the nation where the certificate owner is located.
Key TypeSelect RSA to use the Rivest, Shamir and Adleman public-key algorithm.Select DSA to use the Digital Signature Algorithm public-key algorithm.
Key LengthSelect a number from the drop-down list box to determine how many bits the key should use (1024 to 2048). The longer the key, the more secure it is. A longer key also uses more PKI storage space.
LifeTimes Select how longg the certificate is valid. It can be valid from 2 to 10 years.
Extended Key Usage
Server AuthenticationSelect this to have Zyxel Device generate and store a request for server authentication certificate.
Client AuthenticationSelect this to have Zyxel Device generate and store a request for client authentication certificate.
IKE IntermediateSelect this to have Zyxel Device generate and store a request for IKE Intermediate authentication certificate.
Create a self-signed certificateSelect this to have the Zyxel Device generate the certificate and act as the Certification Authority (CA) itself. This way you do not need to apply to a certification authority for certificates.
Create a certification request and save it locally for later manual enrollmentSelect this to have the Zyxel Device generate and store a request for a certificate. Use the My Certificate Details screen to view the certification request and copy it to send to the certification authority.Copy the certification request from the My Certificate Details screen (see Section 39.11.3.2 on page 810) and then send it to the certification authority.
OKClick OK to begin certificate or certification request generation.
CancelClick Cancel to quit and return to the My Certificates screen.
If you configured the My Certificate Create screen to have the Zyxel Device enroll a certificate and the certificate enrollment is not successful, you see a screen with a Return button that takes you back to the My Certificate Create screen. Click Return and check your information in the My Certificate Create screen. Make sure that the certification authority information is correct and that your Internet connection is working properly if you want the Zyxel Device to enroll a certificate online.

39.11.3.2 The My Certificates Edit Screen

Click Configuration > Object > Certificate > My Certificates and then the Edit icon to open the My Certificate Edit screen. You can use this screen to view in-depth certificate information and change the certificate's name. Figure 535 Configuration > Object > Certificate > My Certificates > Edit ![](images/101a16f923815e6570ca8bf884d60a503bcfc68d0fc389bd88750a36cb0da0de.jpg) The following table describes the labels in this screen. Table 348 Configuration > Object > Certificate > My Certificates > Edit
LABEL DESCRIPTION
NameThis field displays the identifying name of this certificate. You can use up to 31 alphanumeric and ;‘~!@#$%^&()_+[]{}’..=- characters.
Certification Path Thisfield displays for a certificate, not a certification request.Click the Refresh button to have this read-only text box display the hierarchy of certification authorities that validate the certificate (and the certificate itself).If the issuing certification authority is one that you have imported as a trusted certification authority, it may be the only certification authority in the list (along with the certificate itself). If the certificate is a self-signed certificate, the certificate itself is the only one in the list. The Zyxel Device does not trust the certificate and displays “Not trusted” in this field if any certificate on the path has expired or been revoked.
RefreshClick Refresh to display the certification path.
Certificate InformationThese read-only fields display detailed information about the certificate.
TypeThis field displays general information about the certificate. CA-signed means that a Certification Authority signed the certificate. Self-signed means that the certificate's owner signed the certificate (not a certification authority). "X.509" means that this certificate was created and signed according to the ITU-T X.509 recommendation that defines the formats for public-key certificates.
Version This field displays the X.509 version number.
Serial NumberThis field displays the certificate's identification number given by the certification authority or generated by the Zyxel Device.
SubjectThis field displays information that identifies the owner of the certificate, such as Common Name (CN), Organizational Unit (OU), Organization (O), State (ST), and Country (C).
IssuerThis field displays identifying information about the certificate's issuing certification authority, such as Common Name, Organizational Unit, Organization and Country.With self-signed certificates, this is the same as the Subject Name field."none" displays for a certification request.
Signature AlgorithmThis field displays the type of algorithm that was used to sign the certificate. The Zyxel Device uses rsa-pkcs1-sha1 (RSA public-private key encryption algorithm and the SHA1 hash algorithm). Some certification authorities may use rsa-pkcs1-md5 (RSA public-private key encryption algorithm and the MD5 hash algorithm).
Valid FromThis field displays the date that the certificate becomes applicable. "none" displays for a certification request.
Valid ToThis field displays the date that the certificate expires. The text displays in red and includes an Expired! message if the certificate has expired. "none" displays for a certification request.
Key AlgorithmThis field displays the type of algorithm that was used to generate the certificate's key pair (the Zyxel Device uses RSA encryption) and the length of the key set in bits (1024 bits for example).
Subject Alternative NameThis field displays the certificate owner's IP address (IP), domain name (DNS) or email address (EMAIL).
Key UsageThis field displays for what functions the certificate's key can be used. For example, "DigitalSignature" means that the key can be used to sign certificates and "KeyEncipherment" means that the key can be used to encrypt text.
Extended Key UsageThis field displays how the Zyxel Device generates and stores a request for server authentication, client authentication, or IKE Intermediate authentication certificate.
Basic ConstraintThis field displays general information about the certificate. For example, Subject Type=CA means that this is a certification authority's certificate and "Path Length Constraint=1" means that there can only be one certification authority in the certificate's path. This field does not display for a certification request.
MD5 FingerprintThis is the certificate's message digest that the Zyxel Device calculated using the MD5 algorithm.
SHA1 FingerprintThis is the certificate's message digest that the Zyxel Device calculated using the SHA1 algorithm.
Certificate in PEM(Base-64) Encoded FormatThis read-only text box displays the certificate or certification request in Privacy Enhanced Mail (PEM) format. PEM uses lowercase letters, uppercase letters and numerals to convert a binary certificate into a printable form.You can copy and paste a certification request into a certification authority's web page, an email that you send to the certification authority or a text editor and save the file on a management computer for later manual enrollment.You can copy and paste a certificate into an email to send to friends or colleagues or you can copy and paste a certificate into a text editor and save the file on a management computer for later distribution (via external storage device for example).
Export Certificate OnlyUse this button to save a copy of the certificate without its private key. Click this button and thenSavein theFile Downloadscreen. The Save As screen opens, browse to the location that you want to use and clickSave.
PasswordIf you want to export the certificate with its private key, create a password and type it here. Make sure you keep this password in a safe place. You will need to use it if you import the certificate to another device.
Export Certificate with Private KeyUse this button to save a copy of the certificate with its private key. Type the certificate's password and click this button. ClickSavein the File Downloadscreen. The Save As screen opens, browse to the location that you want to use and clickSave.
OKClickOKto save your changes back to the Zyxel Device. You can only change the name.
CancelClickCancelto quit and return to theMy Certificatescreen.

39.11.3.3 The My Certificates Import Screen

Click Configuration > Object > Certificate > My Certificates > Import to open the My Certificate Import screen. Follow the instructions in this screen to save an existing certificate to the Zyxel Device. Note: You can import a certificate that matches a corresponding certification request that was generated by the Zyxel Device. You can also import a certificate in PKCS#12 format, including the certificate's public and private keys. The certificate you import replaces the corresponding request in the My Certificates screen. You must remove any spaces from the certificate's filename before you can import it. Figure 536 Configuration > Object > Certificate > My Certificates > Import ![](images/3b8a13e012a6f23ef60c32e170fe2674c05a088156ebc5d47ce1df2a9346c768.jpg) The following table describes the labels in this screen. Table 349 Configuration > Object > Certificate > My Certificates > Import
LABEL DESCRIPTION
File PathType in the location of the file you want to upload in this field or clickBrowseto find it.You cannot import a certificate with the same name as a certificate that is already in the Zyxel Device.
BrowseClickBrowseto find the certificate file you want to upload.
PasswordThis field only applies when you import a binary PKCS#12 format file. Type the file's password that was created when the PKCS #12 file was exported.
OKClickOKto save the certificate on the Zyxel Device.
CancelClickCancelto quit and return to theMy Certificatesscreen.

39.11.4 The Trusted Certificates Screen

Click Configuration > Object > Certificate > Trusted Certificates to open the Trusted Certificates screen. This screen displays a summary list of certificates that you have set the Zyxel Device to accept as trusted. The Zyxel Device also accepts any valid certificate signed by a certificate on this list as being trustworthy; thus you do not need to import any certificate that is signed by one of these certificates. Figure 537 Configuration > Object > Certificate > Trusted Certificates ![](images/dd5a998e16c5f989eec458b896f0609c0e26bd8741d3a7b86dbde754781deb62.jpg) The following table describes the labels in this screen. Table 350 Configuration > Object > Certificate > Trusted Certificates
LABEL DESCRIPTION
PKI Storage Space in UseThis bar displays the percentage of the Zyxel Device's PKI storage space that is currently in use. When the storage space is almost full, you should consider deleting expired or unnecessary certificates before adding more certificates.
EditDouble-click an entry or select it and click Edit to open a screen with an in-depth list of information about the certificate.
RemoveThe Zyxel Device keeps all of your certificates unless you specifically delete them. Uploading a new firmware or default configuration file does not delete your certificates. To remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so. Subsequent certificates move up by one when you take this action.
ReferencesYou cannot delete certificates that any of the Zyxel Device's features are configured to use. Select an entry and click References to open a screen that shows which settings use the entry.
#This field displays the certificate index number. The certificates are listed in alphabetical order.
NameThis field displays the name used to identify this certificate.
SubjectThis field displays identifying information about the certificate's owner, such as CN (Common Name), OU (Organizational Unit or department), O (Organization or company) and C (Country). It is recommended that each certificate have unique subject information.
IssuerThis field displays identifying information about the certificate's issuing certification authority, such as a common name, organizational unit or department, organization or company and country. With self-signed certificates, this is the same information as in the Subject field.
Valid From This fielddisplays the date that the certificate becomes applicable.
Valid ToThis field displays the date that the certificate expires. The text displays in red and includes an Expired! message if the certificate has expired.
ImportClick Import to open a screen where you can save the certificate of a certification authority that you trust, from your computer to the Zyxel Device.
RefreshClick this button to display the current validity status of the certificates.

39.11.4.1 The Trusted Certificates Edit Screen

Click Configuration > Object > Certificate > Trusted Certificates and then a certificate's Edit icon to open the Trusted Certificates Edit screen. Use this screen to view in-depth information about the certificate, change the certificate's name and set whether or not you want the Zyxel Device to check a certification authority's list of revoked certificates before trusting a certificate issued by the certification authority. Figure 538 Configuration > Object > Certificate > Trusted Certificates > Edit ![](images/bd80c32ff3315246d7fb3ca444cd333bc4597057b0e170ada6e5f54d27fca718.jpg) The following table describes the labels in this screen. Table 351 Configuration > Object > Certificate > Trusted Certificates > Edit
LABEL DESCRIPTION
NameThis field displays the identifying name of this certificate. You can change the name. You can use up to 31 alphanumeric and ;‘~!@#$%^&()_+[]{}’..= characters.
Certification PathClick the Refresh button to have this read-only text box display the end entity's certificate and a list of certification authority certificates that shows the hierarchy of certification authorities that validate the end entity's certificate. If the issuing certification authority is one that you have imported as a trusted certificate, it may be the only certification authority in the list (along with the end entity's own certificate). The Zyxel Device does not trust the end entity's certificate and displays "Not trusted" in this field if any certificate on the path has expired or been revoked.
RefreshClick Refresh to display the certification path.
Enable X.509v3 CRL Distribution Points and OCSP checkingSelect this check box to turn on/off certificate revocation. When it is turned on, the Zyxel Device validates a certificate by getting Certificate Revocation List (CRL) through HTTP or LDAP (can be configured after selecting the LDAP Server check box) and online responder (can be configured after selecting the OCSP Server check box).
OCSP ServerSelect this check box if the directory server uses OCSP (Online Certificate Status Protocol).
URL Type the protocolcol, IP address and path name of the OCSP server.
IDThe Zyxel Device may need to authenticate itself in order to assess the OCSP server. Type the login name (up to 31 ASCII characters) from the entity maintaining the server (usually a certification authority).
PasswordType the password (up to 31 ASCII characters) from the entity maintaining the OCSP server (usually a certification authority).
LDAP ServerSelect this check box if the directory server uses LDAP (Lightweight Directory Access Protocol). LDAP is a protocol over TCP that specifies how clients access directories of certificates and lists of revoked certificates.
Address Type the IP address (in dotted decimal notation) of the directory server.
PortUse this field to specify the LDAP server port number. You must use the same server port number that the directory server uses. 389 is the default server port number for LDAP.
IDThe Zyxel Device may need to authenticate itself in order to assess the CRL directory server. Type the login name (up to 31 ASCII characters) from the entity maintaining the server (usually a certification authority).
PasswordType the password (up to 31 ASCII characters) from the entity maintaining the CRL directory server (usually a certification authority).
Certificate InformationThese read-only fields display detailed information about the certificate.
TypeThis field displays general information about the certificate. CA-signed means that a Certification Authority signed the certificate. Self-signed means that the certificate's owner signed the certificate (not a certification authority). X.509 means that this certificate was created and signed according to the ITU-T X.509 recommendation that defines the formats for public-key certificates.
Version This field displays the X.509 version number.
Serial NumberThis field displays the certificate's identification number given by the certification authority.
SubjectThis field displays information that identifies the owner of the certificate, such as Common Name (CN), Organizational Unit (OU), Organization (O) and Country (C).
IssuerThis field displays identifying information about the certificate's issuing certification authority, such as Common Name, Organizational Unit, Organization and Country.With self-signed certificates, this is the same information as in the Subject Name field.
Signature AlgorithmThis field displays the type of algorithm that was used to sign the certificate. Some certification authorities use rsa-pkcs1-sha1 (RSA public-private key encryption algorithm and the SHA1 hash algorithm). Other certification authorities may use rsa-pkcs1-md5 (RSA public-private key encryption algorithm and the MD5 hash algorithm).
Valid FromThis field displays the date that the certificate becomes applicable. The text displays in red and includes a Not Yet Valid! message if the certificate has not yet become applicable.
Valid ToThis field displays the date that the certificate expires. The text displays in red and includes an Expiring! or Expired! message if the certificate is about to expire or has already expired.
Key AlgorithmThis field displays the type of algorithm that was used to generate the certificate's key pair (the Zyxel Device uses RSA encryption) and the length of the key set in bits (1024 bits for example).
Subject Alternative NameThis field displays the certificate's owner's IP address (IP), domain name (DNS) or email address (EMAIL).
Key UsageThis field displays for what functions the certificate's key can be used. For example, “DigitalSignature” means that the key can be used to sign certificates and “KeyEncipherment” means that the key can be used to encrypt text.
Extended Key UsageThis field displays the method that the Zyxel Device generates and stores a request for server authentication, client authentication, or IKE Intermediate authentication certificate.
Basic ConstraintThis field displays general information about the certificate. For example, Subject Type=CA means that this is a certification authority's certificate and “Path Length Constraint=1” means that there can only be one certification authority in the certificate's path.
MD5 FingerprintThis is the certificate's message digest that the Zyxel Device calculated using the MD5 algorithm. You can use this value to verify with the certification authority (over the phone for example) that this is actually their certificate.
SHA1 FingerprintThis is the certificate's message digest that the Zyxel Device calculated using the SHA1 algorithm. You can use this value to verify with the certification authority (over the phone for example) that this is actually their certificate.
CertificateThis read-only text box displays the certificate or certification request in Privacy Enhanced Mail (PEM) format. PEM uses lowercase letters, uppercase letters and numerals to convert a binary certificate into a printable form.You can copy and paste the certificate into an email to send to friends or colleagues or you can copy and paste the certificate into a text editor and save the file on a management computer for later distribution (via external storage device for example).
Export CertificateClick this button and then Save in the File Download screen. The Save As screen opens, browse to the location that you want to use and click Save.
OKClick OK to save your changes back to the Zyxel Device. You can only change the name.
CancelClick Cancel to quit and return to the Trusted Certificates screen.

39.11.4.2 The Trusted Certificates Import Screen

Click Configuration > Object > Certificate > Trusted Certificates > Import to open the Trusted Certificates Import screen. Follow the instructions in this screen to save a trusted certificate to the Zyxel Device. Note: You must remove any spaces from the certificate's filename before you can import the certificate. Figure 539 Configuration > Object > Certificate > Trusted Certificates > Import ![](images/a19b3d0399ba133db842e61212c99b5218aa3a3475c89b60ee6857858ed699f7.jpg) The following table describes the labels in this screen. Table 352 Configuration > Object > Certificate > Trusted Certificates > Import
LABEL DESCRIPTION
File PathType in the location of the file you want to upload in this field or clickBrowseto find it.You cannot import a certificate with the same name as a certificate that is already in the Zyxel Device.
BrowseClickBrowseto find the certificate file you want to upload.
OKClickOKto save the certificate on the Zyxel Device.
CancelClickCancelto quit and return to the previous screen.

39.11.5 Certificates Technical Reference

OCSP

OCSP (Online Certificate Status Protocol) allows an application or device to check whether a certificate is valid. With OCSP the Zyxel Device checks the status of individual certificates instead of downloading a Certificate Revocation List (CRL). OCSP has two main advantages over a CRL. The first is real-time status information. The second is a reduction in network traffic since the Zyxel Device only gets information on the certificates that it needs to verify, not a huge list. When the Zyxel Device requests certificate status information, the OCSP server returns a "expired", "current" or "unknown" response.

39.12 ISP Account Overview

Use ISP accounts to manage Internet Service Provider (ISP) account information for PPPoE/PPTP/L2TP interfaces. An ISP account is a profile of settings for Internet access using PPPoE, PPTP or L2TP. Use the Object > ISP Account screens (Section 39.12.1 on page 819) to create and manage ISP accounts in the Zyxel Device.

39.12.1 ISP Account Summary

This screen provides a summary of ISP accounts in the Zyxel Device. To access this screen, click Configuration > Object > ISP Account. Figure 540 Configuration > Object > ISP Account ![](images/b72a20cf9a08e74a6e23329d55c78ddb7487c8d1f32e44b6fe2bde9d23ce0073.jpg) The following table describes the labels in this screen. See the ISP Account Add/Edit section below for more information as well. Table 353 Configuration > Object > ISP Account
LABEL DESCRIPTION
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to be able to modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry.
# This field is a sequential value, and it is not associated with a specific entry.
Profile NameThis field displays the profile name of the ISP account. This name is used to identify the ISP account.
Protocol This field displays the protocol used by the ISP account.
Authentication TypeThis field displays the authentication type used by the ISP account.
User Name This field displays the user name of the ISP account.

39.12.1.1 ISP Account Add/Edit

The ISP Account Add/Edit screen lets you add information about new accounts and edit information about existing accounts. To open this window, open the ISP Account screen. (See Section 39.12.1 on page 819.) Then, click on an Add icon or Edit icon to open the ISP Account Edit screen below. Figure 541 Configuration > Object > ISP Account > Edit ![](images/1570481f2b411cf69df9670ae5df1c470475bf0580fe37e06cd6c0f30a391fcc.jpg) The following table describes the labels in this screen. Table 354 Configuration > Object > ISP Account > Edit
LABEL DESCRIPTION
Profile NameThis field is read-only if you are editing an existing account. Type in the profile name of the ISP account. The profile name is used to refer to the ISP account. You may use 1-31 alphanumeric characters, underscores( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive.
ProtocolThis field is read-only if you are editing an existing account. Select the protocol used by the ISP account. Your ISP will provide you with a related username, password and IP (server) information. Options are:pppoe - This ISP account uses the PPPoE protocol.pptp - This ISP account uses the PPTP protocol.l2tp - This ISP account uses the L2TP protocol.
Authentication TypeUse the drop-down list box to select an authentication protocol for outgoing calls. Options are:CHAP/ PAP - Your Zyxel Device accepts either CHAP or PAP when requested by this remote node.Chap - Your Zyxel Device accepts CHAP only.PAP - Your Zyxel Device accepts PAP only.MSCHAP - Your Zyxel Device accepts MSCHAP only.MSCHAP-V2 - Your Zyxel Device accepts MSCHAP-V2 only.
Encryption MethodThis field is available if this ISP account uses the PPTP protocol. Use the drop-down list box to select the type of Microsoft Point-to-Point Encryption (MPPE). Options are:nomppe - This ISP account does not use MPPE.mppe-40 - This ISP account uses 40-bit MPPE.mppe-128 - This ISP account uses 128-bit MMPE.
User Name Type the user name given to you by your ISP.
PasswordType the password associated with the user name above. The password can only consist of alphanumeric characters (A-Z, a-z, 0-9). This field can be blank.
Retype to ConfirmType your password again to make sure that you have entered is correctly.
IP Address/FQDNEnter the IP address or Fully-Qualified Domain Name (FQDN) of the PPTP or L2TP server.
Connection IDThis field is available if this ISP account uses the PPTP protocol. Type your identification name for the PPTP server. This field can be blank.
Service NameIf this ISP account uses the PPPoE protocol, type the PPPoE service name to access. PPPoE uses the specified service name to identify and reach the PPPoE server. This field can be blank.If this ISP account uses the PPTP protocol, this field is not displayed.
CompressionSelect On button to turn on stac compression, and select Off to turn off stac compression. Stac compression is a data compression technique capable of compressing data by a factor of about four.
Idle TimeoutThis value specifies the number of seconds that must elapse without outbound traffic before the Zyxel Device automatically disconnects from the PPPoE/PPTP server. This value must be an integer between 0 and 360. If this value is zero, this timeout is disabled.
OKClick OK to save your changes back to the Zyxel Device. If there are no errors, the program returns to the ISP Account screen. If there are errors, a message box explains the error, and the program stays in the ISP Account Edit screen.
CancelClick Cancel to return to the ISP Account screen without creating the profile (if it is new) or saving any changes to the profile (if it already exists).

39.13 DHCPv6 Overview

This section describes how to configure DHCPv6 request type and lease type objects. - The Request screen (see Section 39.13.1 on page 822) allows you to configure DHCPv6 request type objects. - The Lease screen (see Section 39.2.5 on page 722) allows you to configure DHCPv6 lease type objects.

39.13.1 The DHCPv6 Request Screen

The Request screen allows you to add, edit, and remove DHCPv6 request type objects. To access this screen, login to the Web Configurator, and click Configuration > Object > DHCPv6 > Request. Figure 542 Configuration > Object > DHCPv6 > Request ![](images/616d1a39cab1998bc1089ed4c9105f7eaf1dd328bb9cb051020facce4caf4643.jpg) The following table describes the labels in this screen. Table 355 Configuration > Object > DHCPv6 > Request
LABEL DESCRIPTION
Configuration
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry.
#This field is a sequential value, and it is not associated with a specific object.
Name This field displays the name of each request object.
TypeThis field displays the request type of each request object.
InterfaceThis field displays the interface used for each request object.
Value This field displays the value for each request object.

39.13.1.1 DHCPv6 Request Add/Edit Screen

The Request Add/Edit screen allows you to create a new request object or edit an existing one. To access this screen, go to the Request screen (see Section 39.13.1 on page 822), and click either the Add icon or an Edit icon. Figure 543 Configuration > DHCPv6 > Request > Add ![](images/025bde15b37827e4c7a3efa21655ae5d03b8c7df0b3012205fea84518fcd347a.jpg) The following table describes the labels in this screen. Table 356 Configuration > DHCPv6 > Request > Add
LABEL DESCRIPTION
Name Type the namefor this request object. You may use 1-31 alphanumeric characters, underscores( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive.
Request TypeSelect the request type for this request object. You can choose from Prefix Delegation, DNS Server, NTP Server, or SIP Server.
Interface Select the interface for this request object.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving your changes.

39.13.2 The DHCPv6 Lease Screen

The Lease screen allows you to add, edit, and remove DHCPv6 lease type objects. To access this screen, login to the Web Configurator, and click Configuration > Object > DHCPv6 > Lease. Figure 544 Configuration > Object > DHCPv6 > Lease ![](images/2fab42500e0d2b7f00fa1af0028bbbd564591284458e66df84010f47d437f7b2.jpg) The following table describes the labels in this screen. Table 357 Configuration > Object > DHCPv6 > Lease
LABEL DESCRIPTION
Configuration
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to open a screen where you can modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so.
ReferencesSelect an entry and click References to open a screen that shows which settings use the entry.
#This field is a sequential value, and it is not associated with a specific object.
Name This field displays the name of each lease object.
Type This field displays the request type of each lease object.
Interface This field displays the interface used for each lease object.
Value This field displays the value for each lease object.

39.13.2.1 DHCPv6 Lease Add/Edit Screen

The Lease Add/Edit screen allows you to create a new lease object or edit an existing one. To access this screen, go to the Lease screen (see Section 39.13.2 on page 824), and click either the Add icon or an Edit icon. Figure 545 Configuration > DHCPv6 > Lease > Add ![](images/128ce4284c0e5d2c5e2293506621714fcf6b5a83f62067cf6483e57845c834ff.jpg) The following table describes the labels in this screen. Table 358 Configuration > DHCPv6 > Lease > Add/Edit
LABEL DESCRIPTION
Name Type the namefor this lease object. You may use 1-31 alphanumeric characters, underscores( ), or dashes (-), but the first character cannot be a number. This value is case-sensitive.
Lease TypeSelect the lease type for this lease object. You can choose from Prefix Delegation, DNS Server, Address, Address Pool, NTP Server, or SIP Server.
Interface Select the interface for this lease object.
DUIDIf you select Prefix Delegation or Address in the Lease Type field, enter the DUID of the interface.
AddressIf you select Address in the Lease Type field, enter the IP address of the DHCPv6 server.
PrefixIf you select Prefix Delegation or Address in the Lease Type field, enter the IPv6 prefix of the interface.
DNS ServerIf you select DNS Server in the Lease Type field, select a request object or User Defined in the DNS Server field and enter the IP address of the DNS server in the User Defined Address field below.
Starting IP AddressIf you select Address Pool in the Lease Type field, enter the first of the contiguous addresses in the IP address pool.
End IP AddressIf you select Address Pool in the Lease Type field, enter the last of the contiguous addresses in the IP address pool.
NTP ServerIf you select NTP Server in the Lease Type field, select a request object or User Defined in the NTP Server field and enter the IP address of the NTP server in the User Defined Address field below.
SIP ServerIf you select SIP Server in the Lease Type field, select a request object or User Defined in the SIP field and enter the IP address of the SIP server in the User Defined Address field below.
User Defined AddressIf you select DNS Server, NTP Server, or SIP Server as your lease type, you must enter the IP address of the server your selected.
OKClick OK to save your changes back to the Zyxel Device.
CancelClick Cancel to exit this screen without saving your changes.

CHAPTER 40 Device HA

40.1 Device HA Overview

Device HA lets a backup (or passive) Zyxel Device (B) automatically take over if the master (or active) Zyxel Device (A) fails. Figure 546 Device HA Backup Taking Over for the Master ![](images/236b5d55e5fb305580e687f2f418a2ce3f621803635316ce9e2befa3bf4f61e3.jpg)
flowchart
graph LR
    A["Computer 1"] --> C["×"]
    B["Computer 2"] --> C["×"]
    D["Computer 3"] --> C["×"]
    C --> E["A"]
    C --> F["B"]
    E --> G["Internet"]
    F --> G["Internet"]

40.1.1 What You Can Do in These Screens

- Use the Device HA Status screen (Section 40.2 on page 826) to see the license status for Device HA Pro, and see the status of the active and passive devices. - Use the Device HA Pro screen (Section 40.3 on page 828) to configure Device HA Pro global settings, monitored interfaces and synchronization settings. - Use the View Log screen (Section 40.4 on page 831) to see logs of the active and passive devices.

40.2 Device HA Status

Use this screen to view Device HA Pro license status and details on the active and passive Zyxel Devices. Go to Configuration > Device HA > Device HA Status to view the following screen. Figure 547 Configuration > Device HA > Device HA Status ![](images/12546d1ecda976da1192142cab3e463fad8fa59a3d8fc4a56c310145c0496abd.jpg) The following table describes the labels in this screen. Table 359 Configuration > Device HA > Device HA Status
LABEL DESCRIPTION
Active Device StatusThis section displays information on the active Zyxel Device with an activated Device HA Pro license.
Health StatusThis displays Off or On depending on whether Device HA Pro is disabled or enabled on the active Zyxel Device.
S/N This displays the serialnumber of the active Zyxel Device.
Virtual MACThis displays the hardware MAC address of the active Zyxel Device with an activated Device HA Pro license.
Synch StatusThis displays the synchronization progress, No Progress / Fail / Abort / Success / In Progress, between the active Zyxel Device with an activated Device HA Pro license and the passive Zyxel Device.
Passive Device StatusThis section displays information on the passive Zyxel Device with an activated Device HA Pro license.
Health StatusThis displays Off or On depending on whether Device HA Pro is disabled or enabled on the passive Zyxel Device.
S/N This displays the serialnumber of the passive Zyxel Device.
Virtual MACThis displays the hardware MAC address of the passive Zyxel Device.
Synch StatusThis displays the synchronization progress, No Progress / Fail / Abort / Success / In Progress, between the passive Zyxel Device with an activated Device HA Pro license and the active Zyxel Device.
Device HA Pro LicenseThese are the steps to activate a Device HA Pro license on your active and passive Zyxel Devices.1. See your Device HA Pro iCard. The card contains two keys.2. Register your active and passive Zyxel Devices at myZyxel.3. Activate the license by entering one key on the active Zyxel Device and the other key on the passive Zyxel Device. It doesn't matter which Zyxel Device is actually active or passive as this is dynamic in Device HA Pro.
Service StatusThis field displays whether a service license is enabled at myZyxel (Activated) or not (Not Activated) or expired (Expired). It displays the remaining Grace Period if your license hasExpired. It displays Not Licensed if there isn't a license to be activated for this service.If you need a license or a trial license has expired, clickBuyto buy a new one. If a Standard license has expired, clickRenewto extend the license.Then, clickActivateto connect with the myZyxel server to activate the new license.
ApplyClickApplyto save your changes back to the Zyxel Device.
ResetClickResetto return the screen to its last-saved settings.

40.3 Device HA Pro

You need a license to use Device HA Pro. Device HA Pro is easier to deploy than Device HA, is more reliable (no risk of overloading), and faster (Device HA causes a connection break of 10\~30 seconds while Device HA Pro just has 1\~2 seconds). In addition to configuration file backup in Device HA, device time, TCP sessions (IPv4/IPv6), IPSec VPN sessions, login/logout information, DHCP table, IP/MAC binding table and license status can also be backed up using Device HA Pro.

Active and Passive Devices

Device HA Pro uses a dedicated heartbeat link between an active device ('master') and a passive device ('backup') for status syncing and backup to the passive device. On the passive device, all ports are disabled except for the port with the heartbeat link. In the following example, Zyxel Device A is the active device that is connected to passive device Zyxel Device B via a dedicated link that is used for heartbeat control, configuration synchronization and troubleshooting. All links on Zyxel Device B are down except for the dedicated heartbeat link. Note: The dedicated heartbeat link port must be the highest-numbered copper Ethernet port on each Zyxel Device for Device HA Pro to work. Figure 548 Device HA Pro ![](images/58333ad7e31e5a93b8af672178f70cb61b20f03831fa5037b0a807df4ef32b8f.jpg)
flowchart
graph LR
    A["Computer 1"] --> C["×"]
    B["Computer 2"] --> C["×"]
    D["Computer 3"] --> C["×"]
    C --> E["A"]
    C --> F["B"]
    E --> G["Internet"]
    F --> G["Internet"]
Failover from the active Zyxel Device to the passive Zyxel Device is activated when: • A monitored interface is down. - A monitored service (daemon) is down. • The heartbeat link exceeds the failure tolerance. After failover, the initial active Zyxel Device becomes the passive Zyxel Device after it recovers.

40.3.1 Deploying Device HA Pro

1 Register either the active or passive Zyxel Device with a Device HA Pro license at myZyxel. Check that it's properly licensed in Licensing > Registration > Service in the active Zyxel Device. 2 Make sure the passive Zyxel Device is offline, then enable Device HA in Device HA > General in the passive Zyxel Device. 3 Must make sure the FTP port in System > FTP (default 21) is the same on both Zyxel Devices. FTP is used for transferring files in the event of failover from active to passive Zyxel Device. 4 Connect the passive Zyxel Device to the active Zyxel Device using the highest-numbered copper Ethernet ports on both Zyxel Devices. This is the heartbeat interface. Make sure that this interface is not already configured for other features such as LAG, VLAN, Bridge. 5 If both Zyxel Devices are turned on at the same time with Device HA enabled, then they may send the heartbeat at the same time. In this case, the Zyxel Device with the bigger MAC address becomes the passive Zyxel Device. 6 When using Device HA Pro to synchronize firmware, the location of the running firmware must be the same in both active and passive Zyxel Devices. For example, if the running firmware is in partition 1 in the active Zyxel Device (standby firmware in partition 2), then the running firmware must also be in partition 1 in the passive Zyxel Device (standby firmware in partition 2).

40.3.2 Configuring Device HA Pro

Go to Configuration > Device HA > Device HA Pro and configure the following screen. Figure 549 Configuration > Device HA > Device HA Pro ![](images/ca5d1db03c323b131829a5e963789cae90b1b0a3dd757c2a144a2f0b912f75c5.jpg) The following table describes the labels in this screen. Table 360 Configuration > Device HA > Device HA Pro
LABEL DESCRIPTION
Enable Device HASelect this to turn the Zyxel Device's Device HA Pro feature on.
Enable Configuration Provisioning From Active Device.Select this to have a passive Zyxel Device copy the active Zyxel Device's configuration, signatures (anti-malware, IDP/application patrol, URL Threat filter, and IP reputation), and certificates.Note: Only Zyxel Devices of the same model and firmware version can synchronize.
Serial Number of Licensed Device for License SynchronizationType the serial number of the Zyxel Device (active or passive) with the Device HA Pro subscribed license.
Active Device Management IPType the IPv4 address of the highest-numbered copper Ethernet port on the active Zyxel Device (the heartbeat dedicated link port).
Passive Device Management IPType the IPv4 address of the highest-numbered copper Ethernet port on the passive Zyxel Device (the heartbeat dedicated link port).Note: The active and passive Zyxel Device Management IP addresses must be in the same subnet.
Subnet Mask Type the subnetmask for the management IP addresses.
PasswordType a synchronization password of between 1 and 32 single-byte printable characters. You will be prompted for the password before synchronization takes place.
Retype to ConfirmType the exact same synchronization password as typed above.
Heartbeat IntervalType the number of seconds (1-10) allowed for absence of a heartbeat signal before a failure of the active Zyxel Device is recorded.
Heartbeat Lost ToleranceType the number of heartbeat failures allowed before failover is activated on the passive Zyxel Device.
Monitor InterfaceSelect an interface in Available Interfaces and click the right-arrow button to move it to Monitor Interface to become a Device HA pro monitored interface. To remove a Device HA pro monitored interface, select it in Monitor Interface and click the left-arrow button to move it to Available Interfaces.
Failover Detection
Enable Failover When Interface Failure (Option)Select this to have the passive Zyxel Device take over when a monitored interface fails.
Enable Failover When Device Service Fails (Option)Select this to have the passive Zyxel Device take over when a monitored service daemon on the active Zyxel Device fails.
ApplyClick Apply to save your Device HA Pro configurations back to the Zyxel Device but keep the Zyxel Device using Device HA (general).
ResetClick Reset to return the screen to its last-saved settings.

40.4 View Log

Use this screen to see Device HA Pro logs on the active and passive Zyxel Devices. Go to Configuration > Device HA > View Log to display the following screen. Figure 550 Configuration > Device HA > View Log ![](images/359d10b7ac3fc4c38102cc68b313f6143de5c320319afdf345bb52e04c888e9f.jpg) The following table describes the labels in this screen. Table 361 Configuration > Device HA > View Log
LABEL DESCRIPTION
Logs
Active Device This displays Device HA Pro logs on the active Zyxel Device.
Passive Device This displays Device HA Pro logs on the passive Zyxel Device.
RefreshClick Refresh to update information in this screen.

CHAPTER 41 Cloud CNM

41.1 Cloud CNM Overview

You need licenses to use Cloud CNM SecuManager and Cloud CNM SecuReporter. You need the SecuManager license to get a CNM ID with which you can access the SecuManager server. It is independent from the Zyxel Devices. The SecuReporter license must be activated on each Zyxel Device.

41.1.1 What You Can Do in this Chapter

- Use the Cloud CNM > SecuManager screen (Section 41.2 on page 833) to enable and configure management of the Zyxel Device by a Central Network Management system. - Use the Cloud CNM > SecuReporter screen (Section 41.3 on page 836) to enable SecuReporter logging on your Zyxel Device, see license status, type, expiration date and access a link to the SecuReporter web portal. The SecuReporter web portal collects and analyzes logs from your Zyxel Device in order to identify anomalies, alert on potential internal / external threats, and report on network usage.

41.2 Cloud CNM SecuManager

Cloud CNM SecuManager is a Virtual Machine-based (VM) management system that uses the TR-069 protocol to encapsulate commands to ZyWALL/USG devices for management and monitoring; these devices must have firmware that supports the TR-069 protocol. In the following figure, SP is the management service provider, while A and B are sites with devices being managed by SP. Figure 551 Cloud CNM SecuManager Example Network Topology ![](images/d5875449809d5d11c480cbf1e0d0c3c6af5e21a36dcdaff0ac7ce26a8875152e.jpg)
flowchart
graph TD
    A["SecuManager"] --> B["Internet"]
    C["SP"] --> B
    B --> D["A"]
    B --> E["B"]
    D --> F["A"]
    D --> G["B"]
    E --> H["B"]
    style A fill:#f9f,stroke:#333
    style B fill:#bbf,stroke:#333
    style C fill:#bfb,stroke:#333
    style D fill:#ffb,stroke:#333
    style E fill:#ffb,stroke:#333
    style F fill:#fff,stroke:#333
    style G fill:#fff,stroke:#333
    style H fill:#fff,stroke:#333
Cloud CNM SecuManager features include: - Batch import of managed devices at one time using one CSV file • See an overview of all managed devices and system information in one place • Monitor and manage devices • Install firmware to multiple devices of the same model at one time - Backup and restore device configuration • View the location of managed devices on a map - Receive notification for events and alarms, such as when a device goes down • Graphically monitor individual devices and see related statistics - Directly access a device for remote configuration - Create four types of administrators with different privileges - Perform Site-to-Site, Hub & Spoke, Fully-meshed and Remote Access VPN provisioning. To allow Cloud CNM SecuManager management of your Zyxel Device: - You must have a Cloud CNM SecuManager license with CNM ID number or a Cloud CNM SecuManager server URL. - The Zyxel Device must be able to communicate with the Cloud CNM SecuManager server. You must configure Configuration > Cloud CNM > SecuManager to allow the Zyxel Device to find the Cloud CNM SecuManager server. Figure 552 Configuration > Cloud CNM > SecuManager ![](images/8322021ee2eccda9a1ee757259fb7bc0d16ebc2551e2171bd31ca70327f02d51.jpg) The following table describes the labels in this screen. Table 362 Configuration > Cloud CNM > SecuManager
LABEL DESCRIPTION
Show Advanced Settings / Hide Advanced SettingsClick this button to display a greater or lesser number of configuration fields.
EnableSelect this to allow management of the Zyxel Device by Cloud CNM SecuManager.
AutoSelect this if your Cloud CNM SecuManager server can access myZyxel to automatically get the VM server URL from myZyxel. You also needCNM IDfrom the Cloud CNM SecuManager license.
CNM URLmyZyxel associates theCNM IDwith theCNM URLwhich identifies the server on which Cloud CNM SecuManager is installed. Therefore you don't need to enter the CNM URL when you selectAuto.
CustomSelect this if your Cloud CNM SecuManager server cannot access myZyxel.
CNM URLSelect this if your VM server or Zyxel Device are in a private network, or if the VM server is behind a NAT router. You then need to manually enter the VM server URL into the Zyxel Device. Enter the IPv4 IP address of the Cloud CNM SecuManager server followed by the port number (default 7547 for HTTPS or 7549 for HTPP) followed by theCNM IDfrom the license inCNM URL. For example, if you installed Cloud CNM SecuManager on a server with IP address 1.1.1.1 andCNM IDV6ABQNTPYGD, then type 1.1.1.1:7547/V6ABQNTPYG or 1.1.1.1:7549/V6ABQNTPYG as theCNM URL.
Transfer ProtocolChoose the CNM URL protocol:HTTPorHTTPS. If you enter 1.1.1.1:7547 as theCNM URL, you must chooseHTTPSas theTransfer Protocol, and then the whole CNM URL is https://1.1.1.1:7547. If you enter 1.1.1.1:7549 as theCNM URL, you must chooseHTTPas the Transfer Protocol, and then the whole CNM URL is http://1.1.1.1:7549.
Periodic InformEnable this to have the Zyxel Device inform the Cloud CNM SecuManager server of its presence at regular intervals.
IntervalType how often the Zyxel Device should inform Cloud CNM SecuManager server of its presence.
HTTPS AuthenticationSelect the check box if you have a HTTPS server certificate.
Server CertificateSelect a certificate the HTTPS server (the Zyxel Device) uses to authenticate itself to the HTTPS client.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.
Note: See the Cloud CNM SecuManager User's Guide for more information on Cloud CNM SecuManager.

41.3 Cloud CNM SecuReporter

Cloud CNM SecuReporter is a security analytics portal that collects and analyzes logs from SecuReporter-licensed Zyxel Devices in order to identify anomalies, alert on potential internal / external threats, and report on network usage. You need to buy a license for SecuReporter for your Zyxel Device and register it at myZyxel. You must be a registered user at myZyxel. You can access the portal from a web browser and also get notifications sent to an app on your mobile phone. Figure 553 Cloud CNM SecuReporter Application Scenario ![](images/2610cde887bb5c6b3715c3af9d10decf4137f0ab01e74991a2041627ebfbd572.jpg)
flowchart
graph TD
    A["Public Cloud"] -->|myZyxel.com| B["Internet"]
    C["Private Cloud"] -->|SecuReporter| B
    D["A"] -->|MyZyxel.com| B
    E["B"] -->|SecuReporter| B
    B --> F["Internet"]
    style A fill:#cce5ff,stroke:#333
    style C fill:#cce5ff,stroke:#333
    style D fill:#cce5ff,stroke:#333
    style E fill:#cce5ff,stroke:#333
    style F fill:#cce5ff,stroke:#333

How to activate and enable SecuReporter

1 Does Service Status displays Activated in the Configuration > Cloud CNM > SecuReporter screen? If not, you have to log in to myZyxel.com and activate the SecuReporter license for this Zyxel Device. The Zyxel Device must be able to communicate with the myZyxel server. Your SecuReporter license displays in Configuration > Licensing > Registration > Service after you activate the SecuReporter license at myZyxel. Figure 554 Configuration > Licensing > Registration > Service ![](images/2449c2784fb3b215c6e9f1ec9460a49ef6f9e1a4ff1c67e3d0b7c8b1dc857479.jpg) 2 After the SecuReporter license is activated, go back to the Configuration > Cloud CNM > SecuReporter screen, and select the categories of logs that you want this Zyxel Device to send to the SecuReporter portal. 3 Select Enable SecuReporter. Do not go to the SecuReporter portal until after you have enabled SecuReporter on this Zyxel Device and applied the settings. You can also see license status, type, expiration date. 4 Click Apply and wait.

How to add this Zyxel Device to SecuReporter

1 Log in to the SecuReporter portal. 2 Go to Settings > Organization & Devices > Add to create an organization. 3 Add this Zyxel Device to an Organization using the hyper link under Unclaimed Device.

SecuReporter Banner

The SecuReporter banner appears when: 1 SecuReporter hasn't been enabled before. 2 The Zyxel Device is not added to an organization yet. Figure 555 SecuReporter Banner ![](images/b040e963718b4a807de912908e185898778bedcd127ff91c7f7c3809efc9ec57.jpg) Click the Continue button in the SecuReporter banner to configure the SecuReporter settings. - Server Status: This is the connection status between the Zyxel Device and the SecuReporter server. This field shows Connected when the Zyxel Device can synchronize with the SecuReporter server. This field shows Timeout when the Zyxel Device can't synchronize with the SecuReporter server. This field shows Fail when the connection between the Zyxel Device and the SecuReporter server is down. - Device Name: Enter the name of the Zyxel Device. This Zyxel Device will be added to a new or existing organization. - Organization: This field appears if you haven't created an organization in the SecuReporter server. Type a name of up to 255 characters and description to create a new organization. - Select from existing organization: Select an existing organization from the drop-down list box to add the Zyxel Device to the selected organization. - Create new organization: Type a name of up to 255 characters and description to create a new organization. - Partially Anonymous: Select this and personal data, such as user names, MAC addresses, email addresses, and host names, will be replaced with artificial identifiers in downloaded logs. - Fully Anonymous: Select this and personal data, such as user names, MAC addresses, email addresses, and host names, will be replaced with anonymized information in downloaded logs. - Non-Anonymous: Select this and personal data, such as user names, MAC addresses, email addresses, and host names, will be identifiable in downloaded logs. Figure 556 SecuReporter Banner Settings ![](images/035c4bd7aea4ad8c879fd4364c51f9ddb8d9a029773c699676864f88c7a4f0b5.jpg) Click Configuration > Cloud CNM > SecuReporter to open the following screen. Figure 557 Figure 558 Configuration > Cloud CNM > SecuReporter ![](images/e8f46150b6ab5c7f9ca5ddc67ef8998ff350a31d55feea3c6ae3f36d4b514906.jpg) The following table describes the labels in this screen. Table 363 Configuration > Cloud CNM > SecuReporter
LABEL DESCRIPTION
Enable SecuReporterSecurity-related logs are sent to the SecuReporter portal. Click the General Data Protection Regulation (GDPR) privacy link below to see the Zyxel privacy policy.This must be selected to have SecuReporter collect and analyze logs from this Zyxel Device.It's selected by default if you have activated a SecuReporter Standard license,You need to select this if you have a SecuReporter Trial license.This field is not available if you do not have a SecuReporter license.
CategoriesSelect the categories of logs that you want this Zyxel Device to send to SecuReporter for analysis and trend spotting.
SecuReporter Service License Status
Service StatusThis field displays whether a service license is enabled at myZyxel (Activated) or not (Not Activated) or expired (Expired). It displays the remaining Grace Period if your license has Expired. It displays Not Licensed if there isn't a license to be activated for this service.
Service TypeThis field displays whether you applied for a trial application (Trial) or registered this service with your iCard's PIN number (Standard). This field is blank when the service is not activated.
Expiration Date This fielddisplays the date your service expires.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

CHAPTER 42 System

42.1 Overview

Use the system screens to configure general Zyxel Device settings.

42.1.1 What You Can Do in this Chapter

- Use the System > Host Name screen (see Section 42.2 on page 842) to configure a unique name for the Zyxel Device in your network. - Use the System > USB Storage screen (see Section 42.3 on page 842) to configure the settings for the connected USB devices. - Use the System > Date/Time screen (see Section 42.4 on page 843) to configure the date and time for the Zyxel Device. - Use the System > Console Speed screen (see Section 42.5 on page 847) to configure the console port speed when you connect to the Zyxel Device via the console port using a terminal emulation program. - Use the System > DNS screen (see Section 42.6 on page 848) to configure the DNS (Domain Name System) server used for mapping a domain name to its corresponding IP address and vice versa. - Use the System > WWW screens (see Section 42.7 on page 858) to configure settings for HTTP or HTTPS access to the Zyxel Device and how the login and access user screens look. - Use the System > SSH screen (see Section 42.8 on page 875) to configure SSH (Secure SHEll) used to securely access the Zyxel Device's command line interface. You can specify which zones allow SSH access and from which IP address the access can come. - Use the System > TELNET screen (see Section 42.9 on page 879) to configure Telnet to access the Zyxel Device's command line interface. Specify which zones allow Telnet access and from which IP address the access can come. - Use the System > FTP screen (see Section 42.10 on page 881) to specify from which zones FTP can be used to access the Zyxel Device. You can also specify from which IP addresses the access can come. You can upload and download the Zyxel Device's firmware and configuration files using FTP. - Your Zyxel Device can act as an SNMP agent, which allows a manager station to manage and monitor the Zyxel Device through the network. Use the System > SNMP screen (see Section 42.11 on page 883) to configure SNMP settings, including from which zones SNMP can be used to access the Zyxel Device. You can also specify from which IP addresses the access can come. - Use the Auth. Server screen (Section 42.12 on page 889) to configure the Zyxel Device to operate as a RADIUS server. - Use the Notification > Mail Server screen (Section 42.13 on page 891) to configure the Zyxel Device to operate as a RADIUS server. - Use the Notification > SMS screen (Section 42.14 on page 892) to turn on the SMS service on the Zyxel Device in order to send dynamic guest account information in text messages and authorization for VPN tunnel access to a secured network. - Use the Notification > Response Message screen (Section 42.15 on page 894) to create a web page when access to a website is restricted due to a security service. - Use the System > Language screen (see Section 42.16 on page 895) to set a language for the Zyxel Device's Web Configurator screens. - Use the System > IPv6 screen (see Section 42.17 on page 896) to enable or disable IPv6 support on the Zyxel Device. - Use the System > ZON screen (see Section 42.18 on page 896) to enable or disable the Zyxel One Network (ZON) utility that uses Zyxel Discovery Protocol (ZDP) for discovering and configuring ZDP-aware Zyxel devices in the same network as the computer on which ZON is installed. Note: See each section for related background information and term definitions.

42.2 Host Name

A host name is the unique name by which a device is known on a network. Click Configuration > System > Host Name to open the Host Name screen. Figure 559 Configuration > System > Host Name ![](images/bc11c862d75678c749f95dd8dff106769d2f734128094d5e4e7368584269441a.jpg) The following table describes the labels in this screen. Table 364 Configuration > System > Host Name
LABEL DESCRIPTION
System NameEnter a descriptive name to identify your Zyxel Device device. This name can be up to 64 alphanumeric characters long. Spaces are not allowed, but dashes (-) underscores (_) and periods (.) are accepted.
Domain NameEnter the domain name (if you know it) here. This name is propagated to DHCP clients connected to interfaces with the DHCP server enabled. This name can be up to 254 alphanumeric characters long. Spaces are not allowed, but dashes “-” are accepted.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

42.3 USB Storage

The Zyxel Device can use a connected USB device to store the system log and other diagnostic information. Use this screen to turn on this feature and set a disk full warning limit. Note: Only connect one USB device. It must allow writing (it cannot be read-only) and use the FAT16, FAT32, EXT2, or EXT3 file system. Click Configuration > System > USB Storage to open the screen as shown next. Figure 560 Configuration > System > USB Storage ![](images/12f229a554c84e34fe5d569a2912959344af4a4df2e8cfcbf3cfd12c0e271f42.jpg) The following table describes the labels in this screen. Table 365 Configuration > System > USB Storage
LABEL DESCRIPTION
Activate USB storage serviceSelect this if you want to use the connected USB device(s).
Disk full warning when remaining space is less thanSet a number and select a unit (MB or %) to have the Zyxel Device send a warning message when the remaining USB storage space is less than the value you set here.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

42.4 Date and Time

For effective scheduling and logging, the Zyxel Device system time must be accurate. The Zyxel Device's Real Time Chip (RTC) keeps track of the time and date. There is also a software mechanism to set the time manually or get the current time and date from an external server. To change your Zyxel Device's time based on your local time zone and date, click Configuration > System > Date/Time. The screen displays as shown. You can manually set the Zyxel Device's time and date or have the Zyxel Device get the date and time from a time server. Figure 561 Configuration > System > Date and Time ![](images/e3350c4dbbfdbaac3f092e2423cfe24993620197b2ad6b936c83e423d545f938.jpg) The following table describes the labels in this screen. Table 366 Configuration > System > Date and Time
LABEL DESCRIPTION
Current Time and Date
Current Time This fielddisplays the present time of your Zyxel Device.
Current Date This fielddisplays the present date of your Zyxel Device.
Time and Date Setup
ManualSelect this radio button to enter the time and date manually. If you configure a new time and date, time zone and daylight saving at the same time, the time zone and daylight saving will affect the new time and date you entered. When you enter the time settings manually, the Zyxel Device uses the new setting once you clickApply.
New Time (hh-mm-ss)This field displays the last updated time from the time server or the last time configured manually.When you set Time and Date Setup to Manual, enter the new time in this field and then click Apply.
New Date (yyyy-mm-dd)This field displays the last updated date from the time server or the last date configured manually.When you set Time and Date Setup to Manual, enter the new date in this field and then click Apply.
Get from Time ServerSelect this radio button to have the Zyxel Device get the time and date from the time server you specify below. The Zyxel Device requests time and date settings from the time server under the following circumstances.When the Zyxel Device starts up.When you clickApplyor Synchronize Nowin this screen.24-hour intervals after starting up.
Time Server AddressEnter the IP address or URL of your time server. Check with your ISP/network administrator if you are unsure of this information.
Sync. NowClick this button to have the Zyxel Device get the time and date from a time server (see the Time Server Addressfield). This also saves your changes (except the daylight saving settings).
Time Zone Setup
Time ZoneChoose the time zone of your location. This will set the time difference between your time zone and Greenwich Mean Time (GMT).
Automatically Sync Time ZoneSelect this for the Zyxel Device to automatically get its time zone.
Daylight Saving
Enable Daylight SavingsDaylight savings is a period from late spring to early fall when many countries set their clocks ahead of normal local time by one hour to give more daytime light in the evening.Select this option if you use Daylight Saving Time.
Automatically adjust clock for Daylight Saving TimeSelect this for the Zyxel Device to automatically adjust the time if daylight savings is implemented in its time zone.
Start DateConfigure the day and time when Daylight Saving Time starts if you selectedEnable Daylight Saving.Theatfield uses the 24 hour format. Here are a couple of examples:Daylight Saving Time starts in most parts of the United States on the second Sunday of March. Each time zone in the United States starts using Daylight Saving Time at 2 A.M. local time. So in the United States you would selectSecond,Sunday,Marchand type 2 in theatfield.Daylight Saving Time starts in the European Union on the last Sunday of March. All of the time zones in the European Union start using Daylight Saving Time at the same moment (1 A.M. GMT or UTC). So in the European Union you would selectLast,Sunday,March. The time you type in theatfield depends on your time zone. In Germany for instance, you would type 2 because Germany's time zone is one hour ahead of GMT or UTC (GMT+1).
End DateConfigure the day and time when Daylight Saving Time ends if you selectedEnable Daylight Saving.Theatfield uses the 24 hour format. Here are a couple of examples:Daylight Saving Time ends in the United States on the first Sunday of November. Each time zone in the United States stops using Daylight Saving Time at 2 A.M. local time. So in the United States you would selectFirst,Sunday,Novemberand type 2 in theatfield.Daylight Saving Time ends in the European Union on the last Sunday of October. All of the time zones in the European Union stop using Daylight Saving Time at the same moment (1 A.M. GMT or UTC). So in the European Union you would selectLast,Sunday,October. The time you type in theatfield depends on your time zone. In Germany for instance, you would type 2 because Germany's time zone is one hour ahead of GMT or UTC (GMT+1).
OffsetSpecify how much the clock changes when daylight saving begins and ends.Enter a number from 1 to 5.5 (by 0.5 increments).For example, if you set this field to 3.5, a log occurred at 6 P.M. in local official time will appear as if it had occurred at 10:30 P.M.
ApplyClickApplyto save your changes back to the Zyxel Device.
ResetClickResetto return the screen to its last-saved settings.

42.4.1 Pre-defined NTP Time Servers List

When you turn on the Zyxel Device for the first time, the date and time start at 2003-01-01 00:00:00. The Zyxel Device then attempts to synchronize with one of the following pre-defined list of Network Time Protocol (NTP) time servers. The Zyxel Device continues to use the following pre-defined list of NTP time servers if you do not specify a time server or it cannot synchronize with the time server you specified. Table 367 Default Time Servers
0.pool.ntp.org
1.pool.ntp.org
2.pool.ntp.org
When the Zyxel Device uses the pre-defined list of NTP time servers, it randomly selects one server and tries to synchronize with it. If the synchronization fails, then the Zyxel Device goes through the rest of the list in order from the first one tried until either it is successful or all the pre-defined NTP time servers have been tried.

42.4.2 Time Server Synchronization

Click the Synchronize Now button to get the time and date from the time server you specified in the Time Server Address field. When the Loading screen appears, you may have to wait up to one minute. Figure 562 Synchronization in Process ![](images/971b63937be62fb69f1bbd93f2ebc8e2055ce4a9bc7f161c7ce2e2971ac4c760.jpg) The Current Time and Current Date fields will display the appropriate settings if the synchronization is successful. If the synchronization was not successful, a log displays in the View Log screen. Try re-configuring the Date/Time screen. To manually set the Zyxel Device date and time. 1 Click System > Date/Time. 2 Select Manual under Time and Date Setup. 3 Enter the Zyxel Device's time in the New Time field. 4 Enter the Zyxel Device's date in the New Date field. 5 Under Time Zone Setup, select your Time Zone from the list. 6 As an option you can select the Enable Daylight Saving check box to adjust the Zyxel Device clock for daylight savings. 7 Click Apply. To get the Zyxel Device date and time from a time server 1 Click System > Date/Time. 2 Select Get from Time Server under Time and Date Setup. 3 Under Time Zone Setup, select your Time Zone from the list. 4 As an option you can select the Enable Daylight Saving check box to adjust the Zyxel Device clock for daylight savings. 5 Under Time and Date Setup, enter a Time Server Address (Table 367 on page 846). 6 Click Apply.

42.5 Console Port Speed

This section shows you how to set the console port speed when you connect to the Zyxel Device via the console port using a terminal emulation program. Click Configuration > System > Console Speed to open the Console Speed screen. Figure 563 Configuration > System > Console Speed ![](images/0f32b29809fe0f4e0fea8fa3594d38411d4fd48529701a8eba1d2fbd6e7e9988.jpg) The following table describes the labels in this screen. Table 368 Configuration > System > Console Speed
LABEL DESCRIPTION
Console Port Speed Usethe drop-down list box to change the speed of the console port. Your Zyxel Device supports 9600, 19200, 38400, 57600, and 115200 bps (default) for the console port.TheConsole Port Speedapplies to a console port connection using terminal emulation software and NOT theConsolein the Zyxel Device Web ConfiguratorStatusscreen.
ApplyClickApplyto save your changes back to the Zyxel Device.
ResetClickResetto return the screen to its last-saved settings.

42.6 DNS Overview

DNS (Domain Name System) is for mapping a domain name to its corresponding IP address and vice versa. The DNS server is extremely important because without it, you must know the IP address of a machine before you can access it.

42.6.1 DNS Server Address Assignment

The Zyxel Device can get the DNS server addresses in the following ways. - The ISP tells you the DNS server addresses, usually in the form of an information sheet, when you sign up. If your ISP gives you DNS server addresses, manually enter them in the DNS server fields. - If your ISP dynamically assigns the DNS server IP addresses (along with the Zyxel Device's WAN IP address), set the DNS server fields to get the DNS server address from the ISP. - You can manually enter the IP addresses of other DNS servers.

42.6.2 Configuring the DNS Screen

Click Configuration > System > DNS to change your Zyxel Device's DNS settings. Use the DNS screen to configure the Zyxel Device to use a DNS server to resolve domain names for Zyxel Device system features like VPN, DDNS and the time server. You can also configure the Zyxel Device to accept or discard DNS queries. Use the Network > Interface screens to configure the DNS server information that the Zyxel Device sends to the specified DHCP client devices. A name query begins at a client computer and is passed to a resolver, a DNS client service, for resolution. The Zyxel Device can be a DNS client service. The Zyxel Device can resolve a DNS query locally using cached Resource Records (RR) obtained from a previous query (and kept for a period of time). If the Zyxel Device does not have the requested information, it can forward the request to DNS servers. This is known as recursion. The Zyxel Device can ask a DNS server to use recursion to resolve its DNS client requests. If recursion on the Zyxel Device or a DNS server is disabled, they cannot forward DNS requests for resolution. A Domain Name Server (DNS) amplification attack is a kind of Distributed Denial of Service (DDoS) attack that uses publicly accessible open DNS servers to flood a victim with DNS response traffic. An open DNS server is a DNS server which is willing to resolve recursive DNS queries from anyone on the Internet. In a DNS amplification attack, an attacker sends a DNS name lookup request to an open DNS server with the source address spoofed as the victim's address. When the DNS server sends the DNS record response, it is sent to the victim. Attackers can request as much information as possible to maximize the amplification effect. Configure the Security Option Control section in the Configuration > System > DNS screen (click Show Advanced Settings to display it) if you suspect the Zyxel Device is being used (either by hackers or by a corrupted open DNS server) in a DNS amplification attack. Figure 564 Configuration > System > DNS ![](images/8b1afdf4241dbd61caad48981c356e7f9763cae3c0ee145e6e3f1805a105c0b3.jpg) The following table describes the labels in this screen. Table 369 Configuration > System > DNS
LABEL DESCRIPTION
Address/PTR RecordThis record specifies the mapping of a Fully-Qualified Domain Name (FQDN) to an IP address. An FQDN consists of a host and domain name. For example, www.zyxel.com.tw is a fully qualified domain name, where "www" is the host, "zyxel" is the third-level domain, "com" is the second-level domain, and "tw" is the top level domain.
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to be able to modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so. Note that subsequent entries move up by one when you take this action.
# This is the index number of the address/PTR record.
FQDN This is a host's fully qualified domain name.
IP Address This is the IP address of a host.
CNAME RecordThis record specifies an alias for a FQDN. Use this record to bind all subdomains with the same IP address as the FQDN without having to update each one individually, which increases chance for errors. See CNAME Record (Section 42.6.6 on page 853) for more details.
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to be able to modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so. Note that subsequent entries move up by one when you take this action.
#This is the index number of the domain zone forwarder record. The ordering of your rules is important as rules are applied in sequence.A hyphen (-) displays for the default domain zone forwarder record. The default record is not configurable. The Zyxel Device uses this default record if the domain zone that needs to be resolved does not match any of the other domain zone forwarder records.
Alias NameEnter an Alias name. Use "*." as prefix for a wildcard domain name. For example, *.example.com.
FQDN Enter the Fully Qualified Domain Name (FQDN).
Domain Zone ForwarderThis specifies a DNS server's IP address. The Zyxel Device can query the DNS server to resolve domain zones for features like VPN, DDNS and the time server.When the Zyxel Device needs to resolve a domain zone, it checks it against the domain zone forwarder entries in the order that they appear in this list.
AddClick this to create a new entry. Select an entry and click Add to create a new entry after the selected entry.
EditDouble-click an entry or select it and click Edit to be able to modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so. Note that subsequent entries move up by one when you take this action.
MoveTo change an entry's position in the numbered list, select the method and click Move to display a field to type a number for where you want to put it and press [ENTER] to move the rule to the number that you typed.
#This is the index number of the domain zone forwarder record. The ordering of your rules is important as rules are applied in sequence.A hyphen (-) displays for the default domain zone forwarder record. The default record is not configurable. The Zyxel Device uses this default record if the domain zone that needs to be resolved does not match any of the other domain zone forwarder records.
LABELDESCRIPTION
Domain ZoneA domain zone is a fully qualified domain name without the host. For example, zyxel.com.tw is the domain zone for the www.zyxel.com.tw fully qualified domain name.A “*” means all domain zones.
TypeThis displays whether the DNS server IP address is assigned by the ISP dynamically through a specified interface or configured manually (User-Defined).
DNS ServerThis is the IP address of a DNS server. This field displays N/A if you have the Zyxel Device get a DNS server IP address from the ISP dynamically but the specified interface is not active.
Query ViaThis is the interface through which the Zyxel Device sends DNS queries to the entry’s DNS server. If the Zyxel Device connects through a VPN tunnel, tunnel displays.
MX Record (for My FQDN)A MX (Mail eXchange) record identifies a mail server that handles the mail for a particular domain.
Add Click this to create a new entry.
EditDouble-click an entry or select it and click Edit to be able to modify the entry’s settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so. Note that subsequent entries move up by one when you take this action.
# This is the index number of the MX record.
Domain NameThis is the domain name where the mail is destined for.
IP/FQDNThis is the IP address or Fully-Qualified Domain Name (FQDN) of a mail server that handles the mail for the domain specified in the field above.
Security Option ControlClick Show Advanced Settings to display this part of the screen. There are two control policies: Default and Customize.
EditClick either control policy and then click this button to change allow or deny actions for Query Recursion and Additional Info from Cache.
PriorityThe Customize control policy is checked first and if an address object match is not found, the Default control policy is checked.
NameYou may change the name of the Customize control policy.
AddressThese are the object addresses used in the control policy. RFC1918 refers to private IP address ranges. It can be modified in Object > Address.
Additional Info from CacheThis displays if the Zyxel Device is allowed or denied to cache Resource Records (RR) obtained from previous DNS queries.
Query RecursionThis displays if the Zyxel Device is allowed or denied to forward DNS client requests to DNS servers for resolution.
Service ControlThis specifies from which computers and zones you can send DNS queries to the Zyxel Device.
AddClick this to create a new entry. Select an entry and click Add to create a new entry after the selected entry.
EditDouble-click an entry or select it and click Edit to be able to modify the entry’s settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so. Note that subsequent entries move up by one when you take this action.
MoveTo change an entry’s position in the numbered list, select the method and click Move to display a field to type a number for where you want to put it and press [ENTER] to move the rule to the number that you typed.
LABEL DESCRIPTION
#This the index number of the service control rule. The ordering of your rules is important as rules are applied in sequence.The entry with a hyphen (-) instead of a number is the Zyxel Device's (non-configurable) default policy. The Zyxel Device applies this to traffic that does not match any other configured rule. It is not an editable rule. To apply other behavior, configure a rule that traffic will match so the Zyxel Device will not have to use the default policy.
ZoneThis is the zone on the Zyxel Device the user is allowed or denied to access.
AddressThis is the object name of the IP address(es) with which the computer is allowed or denied to send DNS queries.
ActionThis displays whether the Zyxel Device accepts DNS queries from the computer with the IP address specified above through the specified zone (Accept) or discards them (Deny).

42.6.3 (IPv6) Address Record

An address record contains the mapping of a Fully-Qualified Domain Name (FQDN) to an IP address. The Zyxel Device allows you to configure address records about the Zyxel Device itself or another device. This way you can keep a record of DNS names and addresses that people on your network may use frequently. If the Zyxel Device receives a DNS query for an FQDN for which the Zyxel Device has an address record, the Zyxel Device can send the IP address in a DNS response without having to query a DNS name server.

42.6.4 PTR Record

A PTR (pointer) record is also called a reverse record or a reverse lookup record. It is a mapping of an IP address to a domain name.

42.6.5 Adding an (IPv6) Address/ PTR Record

Click the Add icon in the Address/ PTR Record or IPv6 Address/ PTR Record table to add an IPv4 or IPv6 address/PTR record. Figure 565 Configuration > System > DNS > Address/PTR Record Edit ![](images/eab2f161d09f6efdb188b357eae04fb28335f5c43496f4fdfa4a14fb3d7d9d79.jpg) The following table describes the labels in this screen. Table 370 Configuration > System > DNS > (IPv6) Address/PTR Record Edit
LABEL DESCRIPTION
FQDNType a Fully-Qualified Domain Name (FQDN) of a server. An FQDN starts with a host name and continues all the way up to the top-level domain name. For example, www.zyxel.com.tw is a fully qualified domain name, where "www" is the host, "zyxel" is the third-level domain, "com" is the second-level domain, and "tw" is the top level domain. Underscores are not allowed.Use "*." as a prefix in the FQDN for a wildcard domain name (for example, *.example.com).
IP AddressEnter the IP address of the host in dotted decimal notation.
OKClick OK to save your customized settings and exit this screen.
CancelClick Cancel to exit this screen without saving.

42.6.6 CNAME Record

A Canonical Name Record or CNAME record is a type of resource record in the Domain Name System (DNS) that specifies that the domain name is an alias of another, canonical domain name. This allows users to set up a record for a domain name which translates to an IP address, in other words, the domain name is an alias of another. This record also binds all the subdomains to the same IP address without having to create a record for each, so when the IP address is changed, all subdomain's IP address is updated as well, with one edit to the record. For example, the domain name zyxel.com is hooked up to a record named A which translates it to 11.22.33.44. You also have several subdomains, like mail.zyxel.com, ftp.zyxel.com and you want this subdomain to point to your main domain zyxel.com. Edit the IP Address in record A and all subdomains will follow automatically. This eliminates chances for errors and increases efficiency in DNS management.

42.6.7 Adding a CNAME Record

Click the Add icon in the CNAME Record table to add a record. Use “\*.” as a prefix for a wildcard domain name. For example \*.zyxel.com. Figure 566 Configuration > System > DNS > CNAME Record > Add ![](images/f31ff291b250573a58bba75bc4b4db1bba0267508b4e8506f510294ea89afa02.jpg) The following table describes the labels in this screen. Table 371 Configuration > System > DNS > CNAME Record > Add
LABEL DESCRIPTION
Alias nameEnter an Alias Name. Use "*.as a prefix in the Alias name for a wildcard domain name (for example, *.example.com).
FQDNType a Fully-Qualified Domain Name (FQDN) of a server. An FQDN starts with a host name and continues all the way up to the top-level domain name. For example, www.zyxel.com.tw is a fully qualified domain name, where "www" is the host, "zyxel" is the third-level domain, "com" is the second-level domain, and "tw" is the top level domain. Underscores are not allowed.Use "*.as a prefix in the FQDN for a wildcard domain name (for example, *.example.com).
OKClick OKto save your customized settings and exit this screen.
CancelClick Cancelto exit this screen without saving.

42.6.8 Domain Zone Forwarder

A domain zone forwarder contains a DNS server's IP address. The Zyxel Device can query the DNS server to resolve domain zones for features like VPN, DDNS and the time server. A domain zone is a fully qualified domain name without the host. For example, zyxel.com.tw is the domain zone for the www.zyxel.com.tw fully qualified domain name.

42.6.9 Adding a Domain Zone Forwarder

Click the Add icon in the Domain Zone Forwarder table to add a domain zone forwarder record. Figure 567 Configuration > System > DNS > Domain Zone Forwarder Add ![](images/9dbbb2d38aa15c538d0c8d305d0108ec6926b6730ca02b4900202bea459a9235.jpg) The following table describes the labels in this screen. Table 372 Configuration > System > DNS > Domain Zone Forwarder Add
LABEL DESCRIPTION
Domain ZoneA domain zone is a fully qualified domain name without the host. For example, zyxel.com.tw is the domain zone for the www.zyxel.com.tw fully qualified domain name. For example, whenever the Zyxel Device receives needs to resolve a zyxel.com.tw domain name, it can send a query to the recorded name server IP address.Enter * if all domain zones are served by the specified DNS server(s).
DNS ServerSelect DNS Server(s) from ISP if your ISP dynamically assigns DNS server information. You also need to select an interface through which the ISP provides the DNS server IP address(es). The interface should be activated and set to be a DHCP client. The fields below display the (read-only) DNS server IP address(es) that the ISP assigns. N/A displays for any DNS server IP address fields for which the ISP does not assign an IP address.Select Public DNS Server if you have the IP address of a DNS server. Enter the DNS server's IP address in the field to the right. The Zyxel Device must be able to connect to the DNS server without using a VPN tunnel. The DNS server could be on the Internet or one of the Zyxel Device's local networks. You cannot use 0.0.0.0. Use the Query via field to select the interface through which the Zyxel Device sends DNS queries to a DNS server.Select Private DNS Server if you have the IP address of a DNS server to which the Zyxel Device connects through a VPN tunnel. Enter the DNS server's IP address in the field to the right. You cannot use 0.0.0.0.
OKClick OK to save your customized settings and exit this screen.
CancelClick Cancel to exit this screen without saving.

42.6.10 MX Record

A MX (Mail eXchange) record indicates which host is responsible for the mail for a particular domain, that is, controls where mail is sent for that domain. If you do not configure proper MX records for your domain or other domain, external email from other mail servers will not be able to be delivered to your mail server and vice versa. Each host or domain can have only one MX record, that is, one domain is mapping to one host.

42.6.11 Adding a MX Record

Click the Add icon in the MX Record table to add a MX record. Figure 568 Configuration > System > DNS > MX Record Add ![](images/518bd47117e3c4169500ff66ac1aa54832e41bd7e8bd3e1b10f9fd28d909c940.jpg) The following table describes the labels in this screen. Table 373 Configuration > System > DNS > MX Record Add
LABEL DESCRIPTION
Domain NameEnter the domain name where the mail is destined for.
IP Address/FQDNEnter the IP address or Fully-Qualified Domain Name (FQDN) of a mail server that handles the mail for the domain specified in the field above.
OKClick OK to save your customized settings and exit this screen.
CancelClick Cancel to exit this screen without saving.

42.6.12 Security Option Control

Configure the Security Option Control section in the Configuration > System > DNS screen (click Show Advanced Settings to display it) if you suspect the Zyxel Device is being used by hackers in a DNS amplification attack. One possible strategy would be to deny Query Recursion and Additional Info from Cache in the default policy and allow Query Recursion and Additional Info from Cache only from trusted DNS servers identified by address objects and added as members in the customized policy.

42.6.13 Editing a Security Option Control

Click a control policy and then click Edit to change allow or deny actions for Query Recursion and Additional Info from Cache. Figure 569 Configuration > System > DNS > Security Option Control Edit (Customize) ![](images/91ccd908535dabb13b42e7beb5a627cd02b535d78622a217989eec70adbfbbd2.jpg) The following table describes the labels in this screen. Table 374 Configuration > System > DNS > Security Option Control Edit (Customize)
LABEL DESCRIPTION
NameYou may change the name for the customized security option control policy. The customized security option control policy is checked first and if an address object match is not found, the Default control policy is checked.
Query RecursionChoose if the ZyWALL/USG is allowed or denied to forward DNS client requests to DNS servers for resolution. This can apply to specific open DNS servers using the address objects in a customized rule.
Additional Info from CacheChoose if the ZyWALL/USG is allowed or denied to cache Resource Records (RR) obtained from previous DNS queries.
Address ListSpecifying address objects is not available in the default policy as all addresses are included.
AvailableThis box displays address objects created in Object > Address. Select one (or more), and click the > arrow to have it (them) join the Member list of address objects that will apply to this rule. For example, you could specify an open DNS server suspect of sending compromised resource records by adding an address object for that server to the member list.
MemberThis box displays address objects that will apply to this rule.
OKClick OK to save your customized settings and exit this screen.
CancelClick Cancel to exit this screen without saving.

42.6.14 Adding a DNS Service Control Rule

Click the Add icon in the Service Control table to add a service control rule. Figure 570 Configuration > System > DNS > Service Control Rule Add ![](images/9495a1ce61bc84ba3de5efe4cb4eff74f69660326d93aa1f7ace728147d6cba0.jpg) The following table describes the labels in this screen. Table 375 Configuration > System > DNS > Service Control Rule Add
LABEL DESCRIPTION
Create new ObjectUse this to configure any new settings objects that you need to use in this screen.
Address ObjectSelect ALL to allow or deny any computer to send DNS queries to the Zyxel Device.Select a predefined address object to just allow or deny the computer with the IP address that you specified to send DNS queries to the Zyxel Device.
ZoneSelect ALL to allow or prevent DNS queries through any zones.Select a predefined zone on which a DNS query to the Zyxel Device is allowed or denied.
ActionSelect Accept to have the Zyxel Device allow the DNS queries from the specified computer.Select Deny to have the Zyxel Device reject the DNS queries from the specified computer.
OKClick OK to save your customized settings and exit this screen.
CancelClick Cancel to exit this screen without saving.

42.7 WWW Overview

The following figure shows secure and insecure management of the Zyxel Device coming in from the WAN. HTTPS and SSH access are secure. HTTP and Telnet access are not secure. Note: To allow the Zyxel Device to be accessed from a specified computer using a service, make sure you do not have a service control rule or to-Zyxel Device security policy rule to block that traffic. To stop a service from accessing the Zyxel Device, clear Enable in the corresponding service screen.

42.7.1 Service Access Limitations

A service cannot be used to access the Zyxel Device when: 1 You have disabled that service in the corresponding screen. 2 The allowed IP address (address object) in the Service Control table does not match the client IP address (the Zyxel Device disallows the session). 3 The IP address (address object) in the Service Control table is not in the allowed zone or the action is set to Deny. 4 There is a security policy rule that blocks it.

42.7.2 System Timeout

There is a lease timeout for administrators. The Zyxel Device automatically logs you out if the management session remains idle for longer than this timeout period. The management session does not time out when a statistics screen is polling. Each user is also forced to log in the Zyxel Device for authentication again when the reauthentication time expires. You can change the timeout settings in the User/Group screens.

42.7.3 HTTPS

You can set the Zyxel Device to use HTTP or HTTPS (HTTPS adds security) for Web Configurator sessions. Specify which zones allow Web Configurator access and from which IP address the access can come. HTTPS (HyperText Transfer Protocol over Secure Socket Layer, or HTTP over SSL) is a web protocol that encrypts and decrypts web pages. Secure Socket Layer (SSL) is an application-level protocol that enables secure transactions of data by ensuring confidentiality (an unauthorized party cannot read the transferred data), authentication (one party can identify the other party) and data integrity (you know if data has been changed). It relies upon certificates, public keys, and private keys. HTTPS on the Zyxel Device is used so that you can securely access the Zyxel Device using the Web Configurator. The SSL protocol specifies that the HTTPS server (the Zyxel Device) must always authenticate itself to the HTTPS client (the computer which requests the HTTPS connection with the Zyxel Device), whereas the HTTPS client only should authenticate itself when the HTTPS server requires it to do so (select Authenticate Client Certificates in the WWW screen). Authenticate Client Certificates is optional and if selected means the HTTPS client must send the Zyxel Device a certificate. You must apply for a certificate for the browser from a CA that is a trusted CA on the Zyxel Device. Please refer to the following figure. 1 HTTPS connection requests from an SSL-aware web browser go to port 443 (by default) on the Zyxel Device's web server. 2 HTTP connection requests from a web browser go to port 80 (by default) on the Zyxel Device's web server. Figure 571 HTTP/HTTPS Implementation ![](images/0b11e82272b81eede21bd8e86d731dd0bfaad9e9ba08a02148942e45d709bd8e.jpg) Note: If you disable HTTP in the WWW screen, then the Zyxel Device blocks all HTTP connection attempts.

42.7.4 Configuring WWW Service Control

Click Configuration > System > WWW to open the WWW screen. Use this screen to specify from which zones you can access the Zyxel Device using HTTP or HTTPS. You can also specify which IP addresses the access can come from. Note: Admin Service Control deals with management access (to the Web Configurator). User Service Control deals with user access to the Zyxel Device (logging into SSL VPN for example). Figure 572 Configuration > System > WWW > Service Control ![](images/7a466e4cdf630d037844b7897afcfeeb8970c31f66932cf09ae8ff7a9b37542b.jpg) The following table describes the labels in this screen. Table 376 Configuration > System > WWW > Service Control
LABEL DESCRIPTION
HTTPS
EnableSelect the check box to allow or disallow the computer with the IP address that matches the IP address(es) in theService Controltable to access the Zyxel Device Web Configurator using secure HTTPS connections.
Server PortThe HTTPS server listens on port 443 by default. If you change the HTTPS server port to a different number on the Zyxel Device, for example 8443, then you must notify people who need to access the Zyxel Device Web Configurator to use “https://Zyxel Device IP Address:8443” as the URL.
Authenticate Client CertificatesSelect Authenticate Client Certificates (optional) to require the SSL client to authenticate itself to the Zyxel Device by sending the Zyxel Device a certificate. To do that the SSL client must have a CA-signed certificate from a CA that has been imported as a trusted CA on the Zyxel Device (see Section 42.7.7.5 on page 870 on importing certificates for details).
Server CertificateSelect a certificate the HTTPS server (the Zyxel Device) uses to authenticate itself to the HTTPS client. You must have certificates already configured in the My Certificates screen.
Redirect HTTP to HTTPSTo allow only secure Web Configurator access, select this to redirect all HTTP connection requests to the HTTPS server.
Admin/User Service ControlAdmin Service Control specifies from which zones an administrator can use HTTPS to manage the Zyxel Device (using the Web Configurator). You can also specify the IP addresses from which the administrators can manage the Zyxel Device.User Service Control specifies from which zones a user can use HTTPS to log into the Zyxel Device (to log into SSL VPN for example). You can also specify the IP addresses from which the users can access the Zyxel Device.
AddClick this to create a new entry. Select an entry and click Add to create a new entry after the selected entry.
EditDouble-click an entry or select it and click Edit to be able to modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so. Note that subsequent entries move up by one when you take this action.
MoveTo change an entry's position in the numbered list, select the method and click Move to display a field to type a number for where you want to put it and press [ENTER] to move the rule to the number that you typed.
# This is the index numberThe entry with a hyphen (-) instead of a number is the Zyxel Device's (non-configurable) default policy. The Zyxel Device applies this to traffic that does not match any other configured rule. It is not an editable rule. To apply other behavior, configure a rule that traffic will match so the Zyxel Device will not have to use the default policy.
Zone This is the zone onthe Zyxel Device the user is allowed or denied to access.
AddressThis is the object name of the IP address(es) with which the computer is allowed or denied to access.
ActionThis displays whether the computer with the IP address specified above can access the Zyxel Device zone(s) configured in the Zone field (Accept) or not (Deny).
HTTP
EnableSelect the check box to allow or disallow the computer with the IP address that matches the IP address(es) in the Service Control table to access the Zyxel Device Web Configurator using HTTP connections.
Server PortYou may change the server port number for a service if needed, however you must use the same port number in order to use that service to access the Zyxel Device.
Admin/User Service ControlAdmin Service Control specifies from which zones an administrator can use HTTP to manage the Zyxel Device (using the Web Configurator). You can also specify the IP addresses from which the administrators can manage the Zyxel Device.User Service Control specifies from which zones a user can use HTTP to log into the Zyxel Device (to log into SSL VPN for example). You can also specify the IP addresses from which the users can access the Zyxel Device.
AddClick this to create a new entry. Select an entry and click Add to create a new entry after the selected entry.
EditDouble-click an entry or select it and click Edit to be able to modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so. Note that subsequent entries move up by one when you take this action.
MoveTo change an entry's position in the numbered list, select the method and click Move to display a field to type a number for where you want to put it and press [ENTER] to move the rule to the number that you typed.
# This is the index number of the service control rule.The entry with a hyphen (-) instead of a number is the Zyxel Device's (non-configurable) default policy. The Zyxel Device applies this to traffic that does not match any other configured rule. It is not an editable rule. To apply other behavior, configure a rule that traffic will match so the Zyxel Device will not have to use the default policy.
Zone This is the zone on the Zyxel Device the user is allowed or denied to access.
AddressThis is the object name of the IP address(es) with which the computer is allowed or denied to access.
ActionThis displays whether the computer with the IP address specified above can access the Zyxel Device zone(s) configured in the Zone field (Accept) or not (Deny).
Authentication
Client Authentication MethodSelect a method the HTTPS or HTTP server uses to authenticate a client.You must have configured the authentication methods in the Object > Auth. method screen.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

42.7.5 Service Control Rules

Click Add or Edit in the Service Control table in a WWW, SSH, Telnet, FTP or SNMP screen to add a service control rule. Figure 573 Configuration > System > Service Control Rule > Edit ![](images/25bd0bf60725d113346d959bb9aaa583f6156b7627dc66a3cd3e46a7660aa479.jpg) The following table describes the labels in this screen. Table 377 Configuration > System > Service Control Rule > Edit
LABEL DESCRIPTION
Create new ObjectUse this to configure any new settings objects that you need to use in this screen.
Address ObjectSelect ALL to allow or deny any computer to communicate with the Zyxel Device using this service.Select a predefined address object to just allow or deny the computer with the IP address that you specified to access the Zyxel Device using this service.
ZoneSelect ALL to allow or prevent any Zyxel Device zones from being accessed using this service.Select a predefined Zyxel Device zone on which a incoming service is allowed or denied.
ActionSelect Accept to allow the user to access the Zyxel Device from the specified computers.Select Deny to block the user's access to the Zyxel Device from the specified computers.
OKClick OK to save your customized settings and exit this screen.
CancelClick Cancel to exit this screen without saving.

42.7.6 Customizing the WWW Login Page

Click Configuration > System > WWW > Login Page to open the Login Page screen. Use this screen to customize the Web Configurator login screen. You can also customize the page that displays after an access user logs into the Web Configurator to access network services like the Internet. Figure 574 Configuration > System > WWW > Login Page (Desktop View) ![](images/fb2c1d7cffa034921f393a7573474bf6e260bcb3603862d4b18fac777fb748b9.jpg) Figure 575 Configuration > System > WWW > Login Page (Mobile View) ![](images/00b72ec78f2800e6164e3cf74a2a5f43242a6576ac3e2f8d458a17928e109d16.jpg) The following figures identify the parts you can customize in the login and access pages. Figure 576 Login Page Customization ![](images/405333238fbfbed7131ad422ae1f4871611f710cf6a2016f1d5bf06bfc1de107.jpg) Figure 577 Access Page Customization ![](images/9debcc699da552395f8b3c85741a5f284cd4efcbdc0783c7ce7a702b2533b1bd.jpg) You can specify colors in one of the following ways: - Click Color to display a screen of web-safe colors from which to choose. - Enter the name of the desired color. - Enter a pound sign (#) followed by the six-digit hexadecimal number that represents the desired color. For example, use "#000000" for black. - Enter "rgb" followed by red, green, and blue values in parenthesis and separate by commas. For example, use "rgb(0,0,0)" for black. Your desired color should display in the preview screen on the right after you click in another field, click Apply, or press [ENTER]. If your desired color does not display, your browser may not support it. Try selecting another color. The following table describes the labels on the screen. Table 378 Configuration > System > WWW > Login Page
LABEL DESCRIPTION
Select TypeSelect whether the Web Configurator uses the default login screen or one that you customize in the rest of this screen.
Logo FileYou can upload a graphic logo to be displayed on the upper left corner of the Web Configurator login screen and access page.Specify the location and file name of the logo graphic or clickBrowseto locate it.Note: Use a GIF, JPG, or PNG of 100 kilobytes or less.ClickUploadto transfer the specified graphic file from your computer to the Zyxel Device.
Customized Login PageUse this section to set how the Web Configurator login screen looks.
TitleEnter the title for the top of the screen. Use up to 64 printable ASCII characters. Spaces are allowed.
Title Color Specifythe color of the screen's title text.
Message Color Specifythe color of the screen's text.
Note MessageEnter a note to display at the bottom of the screen. Use up to 64 printable ASCII characters.Spaces are allowed.
Background Set how the screen background looks.To use a graphic, selectPictureand upload a graphic. Specify the location and file name of the logo graphic or clickBrowseto locate it. The picture's size cannot be over 438 x 337 pixels.Note: Use a GIF, JPG, or PNG of 100 kilobytes or less.To use a color, selectColorand specify the color.
Customized Access PageUse this section to customize the page that displays after an access user logs into the Web Configurator to access network services like the Internet.
TitleEnter the title for the top of the screen. Use up to 64 printable ASCII characters. Spaces are allowed.
Message Color Specify the color of the screen's text.
Note MessageEnter a note to display below the title. Use up to 64 printable ASCII characters. Spaces are allowed.
Background Set how the window's background looks.To use a graphic, selectPictureand upload a graphic. Specify the location and file name of the logo graphic or clickBrowseto locate it. The picture's size cannot be over 438 x 337 pixels.Note: Use a GIF, JPG, or PNG of 100 kilobytes or less.To use a color, selectColorand specify the color.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

42.7.7 HTTPS Example

If you haven't changed the default HTTPS port on the Zyxel Device, then in your browser enter "https://Zyxel Device IP Address/" as the web site address where "Zyxel Device IP Address" is the IP address or domain name of the Zyxel Device you wish to access.

42.7.7.1 Internet Explorer Warning Messages

When you attempt to access the Zyxel Device HTTPS server, you will see the error message shown in the following screen. Figure 578 Security Alert Dialog Box (Internet Explorer) ![](images/aa238a633a8522d36f56bc11cc38fd60cf672befbf6ed6e7f54e0fd3a3227a52.jpg) Select Continue to this website to proceed to the Web Configurator login screen. Otherwise, select Click here to close this web page to block the access.

42.7.7.2 Mozilla Firefox Warning Messages

When you attempt to access the Zyxel Device HTTPS server, a The Connection is Untrusted screen appears as shown in the following screen. Click Technical Details if you want to verify more information about the certificate from the Zyxel Device. Select I Understand the Risks and then click Add Exception to add the Zyxel Device to the security exception list. Click Confirm Security Exception. Figure 579 Security Certificate 1 (Firefox) ![](images/c6aac36fb1ad526fc0ec8e5995707c8f70eafa573262a54f61a006e2f7a28fd1.jpg)

This Connection Is Untrusted

You have asked Firefox to connect securely to 172.10.26.9, but we can't confirm that your connection is secure. Normally, when you try to connect securely, sites will present trusted identification to prove that you are going to the right place. However, this site's identity can't be verified.

What Should I Do?

If you usually connect to this site without problems, this error could mean that someone is trying to impersonate the site, and you shouldn't continue. Get me out of here! Technical Details I Understand the Risks Figure 580 Security Certificate 2 (Firefox) ![](images/22dc4f0dfe99c7c128ee4f839898a44b988ff27ae54256b51c11ddec7ac2e801.jpg)

42.7.7.3 Avoiding Browser Warning Messages

Here are the main reasons your browser displays warnings about the Zyxel Device's HTTPS server certificate and what you can do to avoid seeing the warnings: - The issuing certificate authority of the Zyxel Device's HTTPS server certificate is not one of the browser's trusted certificate authorities. The issuing certificate authority of the Zyxel Device's factory default certificate is the Zyxel Device itself since the certificate is a self-signed certificate. - For the browser to trust a self-signed certificate, import the self-signed certificate into your operating system as a trusted certificate. - To have the browser trust the certificates issued by a certificate authority, import the certificate authority's certificate into your operating system as a trusted certificate.

42.7.7.4 Login Screen

After you accept the certificate, the Zyxel Device login screen appears. The lock displayed in the bottom of the browser status bar denotes a secure connection. Figure 581 Login Screen (Internet Explorer) ![](images/89c9870f45563725d71576941ae4848ac0cec53756991023ad08d8475cb1c302.jpg)

42.7.7.5 Enrolling and Importing SSL Client Certificates

The SSL client needs a certificate if Authenticate Client Certificates is selected on the Zyxel Device. You must have imported at least one trusted CA to the Zyxel Device in order for the Authenticate Client Certificates to be active (see the Certificates chapter for details). Apply for a certificate from a Certification Authority (CA) that is trusted by the Zyxel Device (see the Zyxel Device's Trusted CA Web Configurator screen). Figure 582 Zyxel Device Trusted CA Screen ![](images/d6f0d8ef5d4308552b010a31cf3221a63461af193de4df47cc454f177d7063fd.jpg) The CA sends you a package containing the CA's trusted certificate(s), your personal certificate(s) and a password to install the personal certificate(s).

42.7.7.5.1 Installing the CA's Certificate

1 Double click the CA's trusted certificate to produce a screen similar to the one shown next. Figure 583 CA Certificate Example ![](images/3f8511a82f1290a99310ed0d777bd9a406bcd2a6f8062d4fa71a421ce211cd83.jpg) 2 Click Install Certificate and follow the wizard as shown earlier in this appendix.

42.7.7.5.2 Installing Your Personal Certificate(s)

You need a password in advance. The CA may issue the password or you may have to specify it during the enrollment. Double-click the personal certificate given to you by the CA to produce a screen similar to the one shown next 1 Click Next to begin the wizard. Figure 584 Personal Certificate Import Wizard 1 ![](images/542040eaf773b0d2082f2ef506b1e2340d97cb9d898497ad0fec1cbf2886ebe2.jpg) 2 The file name and path of the certificate you double-clicked should automatically appear in the File name text box. Click Browse if you wish to import a different certificate. Figure 585 Personal Certificate Import Wizard 2 ![](images/81a8c6a632a70c8ea71d8fa23e155f60c452c444db17a1c428c9934d05c63c5b.jpg) 3 Enter the password given to you by the CA. Figure 586 Personal Certificate Import Wizard 3 ![](images/bf49bfb62600427f88260eabc95948d494fd28d98b95b3732fc791e57fce7709.jpg) 4 Have the wizard determine where the certificate should be saved on your computer or select Place all certificates in the following store and choose a different location. Figure 587 Personal Certificate Import Wizard 4 ![](images/ed48112b6d166a5022e9d571ee6b52c83b2ac76903cf8f980dd1fa853adba1b5.jpg) 5 Click Finish to complete the wizard and begin the import process. Figure 588 Personal Certificate Import Wizard 5 ![](images/4efcb689679c9c041a9e8fc6213a9e88c0634a0b8906c0ca2eddb40ddbcb0bcf.jpg) 6 You should see the following screen when the certificate is correctly installed on your computer. Figure 589 Personal Certificate Import Wizard 6 ![](images/2ba33000f474e00e60d71524bfb526bc32c89fd97e5960869f3b39058e8f4631.jpg)

42.7.7.6 Using a Certificate When Accessing the Zyxel Device Example

Use the following procedure to access the Zyxel Device via HTTPS. 1 Enter 'https://Zyxel Device IP Address/ in your browser's web address field. Figure 590 Access the Zyxel Device Via HTTPS ![](images/53383621f2ede0a3fde0435764fcc489d3c68d63ee5eca4d72794d0e1d4778c8.jpg) 2 When Authenticate Client Certificates is selected on the Zyxel Device, the following screen asks you to select a personal certificate to send to the Zyxel Device. This screen displays even if you only have a single certificate as in the example. Figure 591 SSL Client Authentication ![](images/86f7b7cda981ec43b38b7762c43c47999409a6eb28c8ba201d4db6d9ffd145ea.jpg) 3 You next see the Web Configurator login screen. Figure 592 Secure Web Configurator Login Screen ![](images/6b7f3c9b32e404f8bc955d44dbeefea2c59d1e00e8b1c4dbdcd062eb41b07559.jpg)

42.8 SSH

You can use SSH (Secure SHell) to securely access the Zyxel Device's command line interface. Specify which zones allow SSH access and from which IP address the access can come. SSH is a secure communication protocol that combines authentication and data encryption to provide secure encrypted communication between two hosts over an unsecured network. In the following figure, computer A on the Internet uses SSH to securely connect to the WAN port of the Zyxel Device for a management session. Note: To allow an SSH connection to the Zyxel Device, add SSH in the Object > Service > Service Group > Default\_Allow\_WAN\_To\_ZyWALL service group which defines the default services allowed in the WAN\_to\_Device security policy. Figure 593 SSH Communication Over the WAN Example ![](images/1707808d77de665ba695f8c84f1b5deab4c1ceaafd9015808518cf416459240b.jpg)
flowchart
graph LR
    A["......"] --> B["Internet"]
    B --> C["Secure Connection"]
    C --> D["A"]

42.8.1 SSH Implementation on the Zyxel Device

Your Zyxel Device supports SSH version 2 using RSA authentication and four encryption methods (AES, 3DES, Archfour, and Blowfish). The SSH server is implemented on the Zyxel Device for management using port 22 (by default).

42.8.2 Requirements for Using SSH

You must install an SSH client program on a client computer (Windows or Linux operating system) that is used to connect to the Zyxel Device over SSH.

42.8.3 Configuring SSH

Click Configuration > System > SSH to change your Zyxel Device's Secure Shell settings. Use this screen to specify from which zones SSH can be used to manage the Zyxel Device. You can also specify from which IP addresses the access can come. Figure 594 Configuration > System > SSH ![](images/af24ac59ea133257bc63b64bbefdf5b502a312cdaf75280ab7470f389c5167e4.jpg) The following table describes the labels in this screen. Table 379 Configuration > System > SSH
LABEL DESCRIPTION
EnableSelect the check box to allow or disallow the computer with the IP address that matches the IP address(es) in the Service Control table to access the Zyxel Device CLI using this service.
Server PortYou may change the server port number for a service if needed, however you must use the same port number in order to use that service for remote management.
Server CertificateSelect the certificate whose corresponding private key is to be used to identify the Zyxel Device for SSH connections. You must have certificates already configured in the My Certificates screen.
Service ControlThis specifies from which computers you can access which Zyxel Device zones.
AddClick this to create a new entry. Select an entry and click Add to create a new entry after the selected entry. Refer to Table 377 on page 863 for details on the screen that opens.
EditDouble-click an entry or select it and click Edit to be able to modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so. Note that subsequent entries move up by one when you take this action.
MoveTo change an entry's position in the numbered list, select the method and click Move to display a field to type a number for where you want to put it and press [ENTER] to move the rule to the number that you typed.
# This the index number of the service control rule.
Zone This is the zone on the Zyxel Device the user is allowed or denied to access.
AddressThis is the object name of the IP address(es) with which the computer is allowed or denied to access.
ActionThis displays whether the computer with the IP address specified above can access the Zyxel Device zone(s) configured in the Zone field (Accept) or not (Deny).
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

42.8.4 Service Control Rules

Click the Add or Edit icon in the Service Control table to add a service control rule. Figure 595 Configuration > System > SSH > Service Control Rule Add/Edit ![](images/4c75175a4f75fe4606134a3082b3ba972786c005a58608b76cb89eda327d1d36.jpg) The following table describes the labels in this screen. Table 380 Configuration > System > SSH > Service Control Rule Add/Edit
LABEL DESCRIPTION
Create new ObjectUse this to configure any new settings objects that you need to use in this screen.
Address ObjectSelect ALL to allow or deny any computer to communicate with the Zyxel Device using SSH.Select a predefined address object to just allow or deny the computer with the IP address that you specified to access the Zyxel Device using SSH.
ZoneSelect ALL to allow or prevent any Zyxel Device zones from being accessed using SSH.Select a predefined Zyxel Device zone on which a incoming service is allowed or denied.
ActionSelect Accept to allow the user to access the Zyxel Device from the specified computers.Select Deny to block the user's access to the Zyxel Device from the specified computers.
OKClick OK to save your customized settings and exit this screen.
CancelClick Cancel to exit this screen without saving.

42.8.5 SSH Example

This section shows using a PuTTY SSH client to remotely access the Zyxel Device. The configuration and connection steps are similar for most SSH client programs. Refer to your SSH client program user's guide. 1 Launch the SSH client and configure the SSH client to use SSH version 2. ![](images/007ad528bb73f16f5f9683195a30cf442c7e3a0b4be1f178892de747da730382.jpg) 2 Specify the connection information (IP address, port number) for the Zyxel Device. ![](images/0535a13d4b25a85838e0310da0855b5cc421058c705085f282cca41ad2c6d439.jpg) 3 A command window displays. Enter the password to log in to the Zyxel Device.
login as: admin
Using keyboard-interactive authentication.
Password:
% session is not found
Bad terminal type: "xterm". Will assume vt100.
Router> enable
Router# 

42.9 Telnet

You can use Telnet to access the Zyxel Device's command line interface. Specify which zones allow Telnet access and from which IP address the access can come.

42.9.1 Configuring Telnet

Click Configuration > System > TELNET to configure your Zyxel Device for remote Telnet access. Use this screen to specify from which zones Telnet can be used to manage the Zyxel Device. You can also specify from which IP addresses the access can come. Note: To allow a Telnet connection to the Zyxel Device, add Telnet in the Object > Service > Service Group > Default\_Allow\_WAN\_To\_ZyWALL service group which defines the default services allowed in the WAN\_to\_Device security policy. Figure 596 Configuration > System > TELNET ![](images/a7066b958b75219f25ab991616031e9741f5933b4ee80bf18ccfc069244de1c5.jpg) The following table describes the labels in this screen. Table 381 Configuration > System > TELNET
LABEL DESCRIPTION
EnableSelect the check box to allow or disallow the computer with the IP address that matches the IP address(es) in theService Controltable to access the Zyxel Device CLI using this service.
Server PortYou may change the server port number for a service if needed, however you must use the same port number in order to use that service for remote management.
Service ControlThis specifies from which computers you can access which Zyxel Device zones.
AddClick this to create a new entry. Select an entry and clickAddto create a new entry after the selected entry. Refer toTable 377 on page 863for details on the screen that opens.
EditDouble-click an entry or select it and clickEditto be able to modify the entry's settings.
RemoveTo remove an entry, select it and clickRemove. The Zyxel Device confirms you want to remove it before doing so. Note that subsequent entries move up by one when you take this action.
MoveTo change an entry's position in the numbered list, select the method and clickMoveto display a field to type a number for where you want to put it and press [ENTER] to move the rule to the number that you typed.
# This the index number of the service control rule.The entry with a hyphen (-) instead of a number is the Zyxel Device's (non-configurable) default policy. The Zyxel Device applies this to traffic that does not match any other configured rule. It is not an editable rule. To apply other behavior, configure a rule that traffic will match so the Zyxel Device will not have to use the default policy.
ZoneThis is the zone on the Zyxel Device the user is allowed or denied to access.
AddressThis is the object name of the IP address(es) with which the computer is allowed or denied to access.
ActionThis displays whether the computer with the IP address specified above can access the Zyxel Device zone(s) configured in theZonefield (Accept) or not (Deny).
ApplyClickApplyto save your changes back to the Zyxel Device.
ResetClickResetto return the screen to its last-saved settings.

42.9.2 Service Control Rules

Click the Add or Edit icon in the Service Control table to add a service control rule. Figure 597 Configuration > System > TELNET > Service Control Rule Add/Edit ![](images/10e972576f9dbcc8364bb7188c9657d68c44977810ef059d7ee930c368dd5efe.jpg) The following table describes the labels in this screen. Table 382 Configuration > System > TELNET > Service Control Rule Add/Edit
LABEL DESCRIPTION
Create new ObjectUse this to configure any new settings objects that you need to use in this screen.
Address ObjectSelect ALL to allow or deny any computer to communicate with the Zyxel Device using Telnet.Select a predefined address object to just allow or deny the computer with the IP address that you specified to access the Zyxel Device using Telnet.
ZoneSelect ALL to allow or prevent any Zyxel Device zones from being accessed using Telnet.Select a predefined Zyxel Device zone on which a incoming service is allowed or denied.
ActionSelect Accept to allow the user to access the Zyxel Device from the specified computers.Select Deny to block the user's access to the Zyxel Device from the specified computers.
OKClick OK to save your customized settings and exit this screen.
CancelClick Cancel to exit this screen without saving.

42.10 FTP

You can upload and download the Zyxel Device's firmware and configuration files using FTP. To use this feature, your computer must have an FTP client.

42.10.1 Configuring FTP

To change your Zyxel Device's FTP settings, click Configuration > System > FTP tab. The screen appears as shown. Use this screen to specify from which zones FTP can be used to access the Zyxel Device. You can also specify from which IP addresses the access can come. Figure 598 Configuration > System > FTP ![](images/3d335f1c4f9b551d0ef0df0173b6fb74ac95d7dac3b68ccaa2cd6cdd0b8414fc.jpg) The following table describes the labels in this screen. Table 383 Configuration > System > FTP
LABEL DESCRIPTION
EnableSelect the check box to allow or disallow the computer with the IP address that matches the IP address(es) in theService Controltable to access the Zyxel Device using this service.
TLS requiredSelect the check box to use FTP over TLS (Transport Layer Security) to encrypt communication.This implements TLS as a security mechanism to secure FTP clients and/or servers.
Server PortYou may change the server port number for a service if needed, however you must use the same port number in order to use that service for remote management.
Server CertificateSelect the certificate whose corresponding private key is to be used to identify the Zyxel Device for FTP connections. You must have certificates already configured in theMy Certificates screen.
Service ControlThis specifies from which computers you can access which Zyxel Device zones.
AddClick this to create a new entry. Select an entry and clickAddto create a new entry after the selected entry. Refer toTable 377 on page 863for details on the screen that opens.
EditDouble-click an entry or select it and clickEditto be able to modify the entry's settings.
RemoveTo remove an entry, select it and clickRemove. The Zyxel Device confirms you want to remove it before doing so. Note that subsequent entries move up by one when you take this action.
MoveTo change an entry's position in the numbered list, select the method and clickMoveto display a field to type a number for where you want to put it and press [ENTER] to move the rule to the number that you typed.
# This the index number of the service control rule.The entry with a hyphen (-) instead of a number is the Zyxel Device's (non-configurable) default policy. The Zyxel Device applies this to traffic that does not match any other configured rule. It is not an editable rule. To apply other behavior, configure a rule that traffic will match so the Zyxel Device will not have to use the default policy.
ZoneThis is the zone on the Zyxel Device the user is allowed or denied to access.
AddressThis is the object name of the IP address(es) with which the computer is allowed or denied to access.
ActionThis displays whether the computer with the IP address specified above can access the Zyxel Device zone(s) configured in theZonefield (Accept) or not (Deny).
LABEL DESCRIPTION
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

42.10.2 Service Control Rules

Click the Add or Edit icon in the Service Control table to add a service control rule. Figure 599 Configuration > System > FTP > Service Control Rule Add/Edit ![](images/5c90d0447e5e70bbd4d68001b9637214459bf81ee126c4893660f3e4061202ff.jpg) The following table describes the labels in this screen. Table 384 Configuration > System > FTP > Service Control Rule Add/Edit
LABEL DESCRIPTION
Create new ObjectUse this to configure any new settings objects that you need to use in this screen.
Address ObjectSelect ALL to allow or deny any computer to communicate with the Zyxel Device using FTP.Select a predefined address object to just allow or deny the computer with the IP address that you specified to access the Zyxel Device using FTP.
ZoneSelect ALL to allow or prevent any Zyxel Device zones from being accessed using FTP.Select a predefined Zyxel Device zone on which a incoming service is allowed or denied.
ActionSelect Accept to allow the user to access the Zyxel Device from the specified computers.Select Deny to block the user's access to the Zyxel Device from the specified computers.
OKClick OK to save your customized settings and exit this screen.
CancelClick Cancel to exit this screen without saving.

42.11 SNMP

Simple Network Management Protocol is a protocol used for exchanging management information between network devices. Your Zyxel Device supports SNMP agent functionality, which allows a manager station to manage and monitor the Zyxel Device through the network. The Zyxel Device supports SNMP version one (SNMPv1), version two (SNMPv2c) and version 3 (SNMPv3). The next figure illustrates an SNMP management operation. Figure 600 SNMP Management Model ![](images/fd895da706218750458847a7a9d4a01ab82da150e7d1fff76e70fa5c48320221.jpg)
flowchart
graph TD
    A["MANAGER"] --> B["AGENT"]
    A --> C["AGENT"]
    A --> D["AGENT"]
    B --> E["Managed Device"]
    C --> F["Managed Device"]
    D --> G["Managed Device"]
    style A fill:#f9f,stroke:#333
    style B fill:#ccf,stroke:#333
    style C fill:#ccf,stroke:#333
    style D fill:#ccf,stroke:#333
An SNMP managed network consists of two main types of component: agents and a manager. An agent is a management software module that resides in a managed device (the Zyxel Device). An agent translates the local management information from the managed device into a form compatible with SNMP. The manager is the console through which network administrators perform network management functions. It executes applications that control and monitor managed devices. The managed devices contain object variables/managed objects that define each piece of information to be collected about a device. Examples of variables include such as number of packets received, node port status etc. A Management Information Base (MIB) is a collection of managed objects. SNMP allows a manager and agents to communicate for the purpose of accessing these objects. SNMP itself is a simple request/response protocol based on the manager/agent model. The manager issues a request and the agent returns responses using the following protocol operations: - Get - Allows the manager to retrieve an object variable from the agent. - GetNext - Allows the manager to retrieve the next object variable from a table or list within an agent. In SNMPv1, when a manager wants to retrieve all elements of a table from an agent, it initiates a Get operation, followed by a series of GetNext operations. - Set - Allows the manager to set values for object variables within an agent. - Trap - Used by the agent to inform the manager of some events.

42.11.1 SNMPv3 and Security

SNMPv3 enhances security for SNMP management using authentication and encryption. SNMP managers can be required to authenticate with agents before conducting SNMP management sessions. Security can be further enhanced by encrypting the SNMP messages sent from the managers. Encryption protects the contents of the SNMP messages. When the contents of the SNMP messages are encrypted, only the intended recipients can read them.

42.11.2 Supported MIBs

The Zyxel Device supports MIB II that is defined in RFC-1213 and RFC-1215. The Zyxel Device also supports private MIBs (zywall.mib and zyxel-zywall-ZLD-Common.mib) to collect information about CPU and memory usage and VPN total throughput. The focus of the MIBs is to let administrators collect statistical data and monitor status and performance. You can download the Zyxel Device's MIBs from www.zyxel.com.

42.11.3 SNMP Traps

The Zyxel Device will send traps to the SNMP manager when any one of the following events occurs. Table 385 SNMP Traps
OBJECT LABEL OBJECT ID DESCRIPTION
Cold Start1.3.6.1.6.3.1.1.5.1This trap is sent when the Zyxel Device is turned on or an agent restarts.
linkDown1.3.6.1.6.3.1.1.5.3This trap is sent when the Ethernet link is down.
linkUp1.3.6.1.6.3.1.1.5.4This trap is sent when the Ethernet link is up.
authenticationFailure1.3.6.1.6.3.1.1.5.5This trap is sent when an SNMP request comes from non-authenticated hosts.
vpnTunnelDisconnected1.3.6.1.4.1.890.1.6.22.2.3This trap is sent when an IPSec VPN tunnel is disconnected.
vpnTunnelName1.3.6.1.4.1.890.1.6.22.2.2.1.1This trap is sent along with the vpnTunnelDisconnected trap. This trap carries the disconnected tunnel's IPSec SA name.
vpnIKEName1.3.6.1.4.1.890.1.6.22.2.2.1.2This trap is sent along with the vpnTunnelDisconnected trap. This trap carries the disconnected tunnel's IKE SA name.
vpnTunnelSPI1.3.6.1.4.1.890.1.6.22.2.2.1.3This trap is sent along with the vpnTunnelDisconnected trap. This trap carries the security parameter index (SPI) of the disconnected VPN tunnel.

42.11.4 Configuring SNMP

To change your Zyxel Device's SNMP settings, click Configuration > System > SNMP tab. The screen appears as shown. Use this screen to configure your SNMP settings, including from which zones SNMP can be used to access the Zyxel Device. You can also specify from which IP addresses the access can come. Figure 601 Configuration > System > SNMP ![](images/8a1844c7aba7a869df97fd952ce4b821c4350981c0782b357ce11a121a85b87d.jpg) The following table describes the labels in this screen. Table 386 Configuration > System > SNMP
LABEL DESCRIPTION
EnableSelect the check box to allow or disallow the computer with the IP address that matches the IP address(es) in theService Controltable to access the Zyxel Device using this service.
Server PortYou may change the server port number for a service if needed, however you must use the same port number in order to use that service for remote management.
Trap
CommunityType the trap community, which is the password sent with each trap to the SNMP manager. The default is public and allows all requests.
DestinationType the IP address of the station to send your SNMP traps to.
Trap CAPWAP EventSelect this option to have the Zyxel Device send a trap to the SNMP manager when a managed AP is connected to or disconnected from the Zyxel Device.
SNMPv2cSelect the SNMP version for the Zyxel Device. The SNMP version on the Zyxel Device must match the version on the SNMP manager.
Get CommunityEnter theGet Community, which is the password for the incoming Get and GetNext requests from the management station. The default is public and allows all requests.
Set CommunityEnter theSet community, which is the password for incoming Set requests from the management station. The default is private and allows all requests.
SNMPv3Select the SNMP version for the Zyxel Device. The SNMP version on the Zyxel Device must match the version on the SNMP manager. SNMPv3 (RFCs 3413 to 3415) provides secure access by authenticating and encrypting data packets over the network. The Zyxel Device uses your login password as the SNMPv3 authentication and encryption passphrase.Note: Your login password must consist of at least 8 printable characters for SNMPv3.An error message will display if your login password has fewer characters.
LABELDESCRIPTION
AddClick this to create a new entry. Select an entry and click Add to create a new entry after the selected entry.
EditDouble-click an entry or select it and click Edit to be able to modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so. Note that subsequent entries move up by one when you take this action.
# This is the index number of the entry.
UserThis displays the name of the user object to be sent to the SNMP manager along with the SNMP v3 trap.
AuthenticationThis displays the authentication algorithm used for this entry. MD5 (Message Digest 5) and SHA (Secure Hash Algorithm) are hash algorithms used to authenticate SNMP data. SHA authentication is generally considered stronger than MD5, but is slower.
PrivacyThis displays the encryption method for SNMP communication from this user. Methods available are:DES - Data Encryption Standard is a widely used (but breakable) method of data encryption. It applies a 56-bit key to each 64-bit block of data.AES - Advanced Encryption Standard is another method for data encryption that also uses a secret key. AES applies a 128-bit key to 128-bit blocks of data.
Privilege This displays the access rights to MIBs.Read-Write - The associated user can create and edit the MIBs on the Zyxel Device, except the user account.Read-Only - The associated user can only collect information from the Zyxel Device MIBs.
Service ControlThis specifies from which computers you can access which Zyxel Device zones.
AddClick this to create a new entry. Select an entry and click Add to create a new entry after the selected entry. Refer to Table 377 on page 863 for details on the screen that opens.
EditDouble-click an entry or select it and click Edit to be able to modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so. Note that subsequent entries move up by one when you take this action.
MoveTo change an entry's position in the numbered list, select the method and click Move to display a field to type a number for where you want to put it and press [ENTER] to move the rule to the number that you typed.
# This the index number of the service control rule.The entry with a hyphen (-) instead of a number is the Zyxel Device's (non-configurable) default policy. The Zyxel Device applies this to traffic that does not match any other configured rule. It is not an editable rule. To apply other behavior, configure a rule that traffic will match so the Zyxel Device will not have to use the default policy.
Zone This is the zone on the Zyxel Device the user is allowed or denied to access.
AddressThis is the object name of the IP address(es) with which the computer is allowed or denied to access.
ActionThis displays whether the computer with the IP address specified above can access the Zyxel Device zone(s) configured in the Zone field (Accept) or not (Deny).
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

42.11.5 Add SNMPv3 User

Click Add under SNMPv3 in Configuration > System > SNMP to create an SNMPv3 user for authentication with managers using SNMP v3. Use the username and password of the login accounts you specify in this screen to create accounts on the SNMP v3 manager. Figure 602 Configuration > System > SNMP(v3) > Add ![](images/b69d565c38ace430445125d9a014b1012707a49a96431acd86c8eb8441af631e.jpg) The following table describes the labels in this screen. Table 387 Configuration > System > SNMP(v3) > Add
LABEL DESCRIPTION
UserSpecify the username of a login account on the Zyxel Device. The associated password is used in authentication algorithms and encryption methods.
AuthenticationSelect an authentication algorithm.MD5 (Message Digest 5) andSHA(Secure Hash Algorithm) are hash algorithms used to authenticate SNMP data. SHA authentication is generally considered stronger than MD5, but is slower.
PrivacySpecify the encryption method for SNMP communication from this user. You can choose one of the following:DES- Data Encryption Standard is a widely used (but breakable) method of data encryption. It applies a 56-bit key to each 64-bit block of data.AES- Advanced Encryption Standard is another method for data encryption that also uses a secret key. AES applies a 128-bit key to 128-bit blocks of data.
Privilege Select the access rights to MIBs.Read-Write- The associated user can create and edit the MIBs on the Zyxel Device, except the user account.Read-Only- The associated user can only collect information from the Zyxel Device MIBs.
OK Click OK to save the changes.
CancelClick Cancelto begin configuring this screen afresh.

42.11.6 Service Control Rules

Click the Add or Edit icon in the Service Control table to add a service control rule. Figure 603 Configuration > System > SNMP > Service Control Rule Add/Edit ![](images/1cf2b5630ae373a87e8a8e67969c5fbb7ae2f4b310a5a43db149c096e0dacbe8.jpg) The following table describes the labels in this screen. Table 388 Configuration > System > SNMP > Service Control Rule Add/Edit
LABEL DESCRIPTION
Create new ObjectUse this to configure any new settings objects that you need to use in this screen.
Address ObjectSelect ALL to allow or deny any computer to communicate with the Zyxel Device using SNMP.Select a predefined address object to just allow or deny the computer with the IP address that you specified to access the Zyxel Device using SNMP.
ZoneSelect ALL to allow or prevent any Zyxel Device zones from being accessed using SNMP.Select a predefined Zyxel Device zone on which a incoming service is allowed or denied.
ActionSelect Accept to allow the user to access the Zyxel Device from the specified computers.Select Deny to block the user's access to the Zyxel Device from the specified computers.
OKClick OK to save your customized settings and exit this screen.
CancelClick Cancel to exit this screen without saving.

42.12 Authentication Server

You can set the Zyxel Device to work as a RADIUS server to exchange messages with a RADIUS client, such as an AP for user authentication and authorization. Click Configuration > System > Auth. Server tab. The screen appears as shown. Use this screen to enable the authentication server feature of the Zyxel Device and specify the RADIUS client's IP address. Figure 604 Configuration > System > Auth. Server ![](images/f1e6d0a91cf5826d70f9bbddf954f9171d6139a8d7588fff2d198b4e61397124.jpg) The following table describes the labels in this screen. Table 389 Configuration > System > Auth. Server
LABEL DESCRIPTION
Enable Authentication ServerSelect the check box to have the Zyxel Device act as a RADIUS server.
Authentication Server CertificateSelect the certificate whose corresponding private key is to be used to identify the Zyxel Device to the RADIUS client. You must have certificates already configured in the My Certificates screen.
Authentication MethodSelect an authentication method if you have created any in the Configuration > Object > Auth.Method screen.
Trusted ClientUse this section to configure trusted clients in the Zyxel Device RADIUS server database.
AddClick this to create a new entry. Select an entry and click Add to create a new entry after the selected entry.
EditDouble-click an entry or select it and click Edit to be able to modify the entry's settings.
RemoveTo remove an entry, select it and click Remove. The Zyxel Device confirms you want to remove it before doing so. Note that subsequent entries move up by one when you take this action.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
# This is the index number of the entry.
StatusThis icon is lit when the entry is active and dimmed when the entry is inactive.
Profile Name This field indicates the name assigned to the profile.
IP AddressThis is the IP address of the RADIUS client that is allowed to exchange messages with the Zyxel Device.
Mask This is the subnet mask of the RADIUS client.
Description This is the description of the RADIUS client.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

42.12.1 Add/Edit Trusted RADIUS Client

Click Configuration > System > Auth. Server to display the Auth. Server screen. Click the Add icon or an Edit icon to display the following screen. Use this screen to create a new entry or edit an existing one. Figure 605 Configuration > System > Auth. Server > Add/Edit ![](images/76ce328aeac82218870425d87808f760369856879f56b5199dc1e23f4195346a.jpg) The following table describes the labels in this screen. Table 390 Configuration > System > Auth. Server > Add/Edit
LABEL DESCRIPTION
Activate Select thischeck box to make this profile active.
Profile NameEnter a descriptive name (up to 31 alphanumeric characters) for identification purposes.
IP AddressEnter the IP address of the RADIUS client that is allowed to exchange messages with the Zyxel Device.
Netmask Enter thesubnet mask of the RADIUS client.
SecretEnter a password (up to 64 alphanumeric characters) as the key to be shared between the Zyxel Device and the RADIUS client.The key is not sent over the network. This key must be the same on the external authentication server and the Zyxel Device.
DescriptionEnter the description of each server, if any. You can use up to 60 printable ASCII characters.
OK Click OK to save the changes.
CancelClick Cancel to discard the changes.

42.13 Notification > Mail Server

Use this screen to configure a mail server so you can receive reports and notification emails such as when your password is about to expire. After you configure the screen, you can test the settings in Maintenance > Diagnostics > Network Tool and then select Test Email Server. See Configuration > Log & Report > Email Daily Report to configure what reports to send and to whom. Click Configuration > System > Notification to display the Mail Server screen. Figure 606 Configuration > System > Notification ![](images/24ced3bad93d7edce58ff3d6a1ff1bc2dda0290040e046c3ab4eca4827022802.jpg) The following table describes the labels in this screen. Table 391 Configuration > System > Notification
LABEL DESCRIPTION
Mail ServerType the name or IP address of the outgoing SMTP server.
Mail SubjectGo toConfiguration > Log & Report > Email Daily Reportto type a subject line for outgoing email from the Zyxel Device.
Append system nameSelectAppend system nameto add the Zyxel Device's system name to the subject.
Append date timeSelectAppend date timeto add the Zyxel Device's system date and time to the subject.
Mail Server PortEnter the same port number here as is on the mail server for mail traffic.
TLS SecuritySelect this option if the mail server uses Transport Layer Security (TLS) for encrypted communications between the mail server and the Zyxel Device.
STARTTLSSelect this option if the mail server uses SSL or TLS for encrypted communications between the mail server and the Zyxel Device.
Authenticate ServerSelect this if the Zyxel Device authenticates the mail server in the TLS handshake.
Mail FromType the email address from which the outgoing email is delivered. This address is used in replies.
SMTP AuthenticationSelect this check box if it is necessary to provide a user name and password to the SMTP server.
User NameThis box is effective when you select theSMTP Authenticationcheck box. Type the user name to provide to the SMTP server when the log is emailed.
PasswordThis box is effective when you select theSMTP Authenticationcheck box. Type a password of up to 63 characters to provide to the SMTP server when the log is emailed.
Retype to ConfirmType the password again to make sure that you have entered is correctly.
Time for sending reportSelect the time of day (hours and minutes) when the log is emailed. Use 24-hour notation.
ApplyClickApplyto save your changes back to the Zyxel Device.
ResetClickResetto return the screen to its last-saved settings.

42.14 Notification > SMS

The Zyxel Device supports Short Message Service (SMS) to send short text messages to mobile phone devices. Click Configuration > System > Notification > SMS to open the following screen. Figure 607 Configuration > System > Notification > SMS ![](images/550c61d52b5788c8c4e4f49cf868a579f52192133285ecdd68f84c945e9f1511.jpg) The following table describes the labels in this screen. Table 392 Configuration > System > Notification > SMS
LABEL DESCRIPTION
General Settings
Enable SMS Selectthe check box to turn on the SMS service.
Default country code for phone numberEnter the default country code for the mobile phone number to which you want to send SMS messages.
SMS ProviderThe Zyxel Device usesEmail-to-SMS Providerto forward SMS messages.Note: Go to theConfiguration > System > Notification > Mail Serverscreen to configure a mail server to allow the Zyxel Device to send SMS messages to the SMS service provider using emails.
Provider DomainEnter the domain name of your SMS service provider. The domain name can be of up to 252 characters.Selectauto append to "Mail to" to add the domain name of your SMS service provider after the mobile phone number in theMail Tofield.
Mail SubjectType the subject line of up to 128 characters for outgoing e-mail from the Zyxel Device.
Mail FromEnter the sender's email address of up to 64 characters. This email address needs to be in your SMS provider's allowed sender address list.If you leave this field blank, the Zyxel Device will use the IP address or domain name of theMail Serverfield in theConfiguration > System > Notification > Mail Sverscreen.
Mail ToEnter the mobile phone number of up to 80 characters. You can only have one receiver.Use this variable in brackets [mobile_number], and the Zyxel Device will use the mobile phone number of the user logging in. Go to theConfiguration > Object > User/Group > Userscreen to add a valid mobile telephone number for a user.
Apply Click this buttonto save your changes to the Zyxel Device.
Reset Click this buttonto return the screen to its last-saved settings.

42.15 Notification > Response Message

Use this screen to create a web page when access to a website is restricted due to a security service. Click Configuration > System > Notification > Response Message to open the following screen. Figure 608 Configuration > System > Notification > Response Message ![](images/8b57e6da0cd6cf30ab4ce4831df518d468666d79ab9e46e2ae9319fcaa27f2b0.jpg) The following table describes the labels in this screen. Table 393 Configuration > System > Notification > Response Message
LABEL DESCRIPTION
MessageUse this part of the screen to create a message to display when access to a website is blocked due to a security service.
EditDouble-click an entry or select it and click Edit to be able to modify the entry's settings.
# This is the index number of the entry.
Service This is the security service that may restrict access to a website.
Denied Access MessageType a message to display when access to a website is blocked due to this security service.You may type up to 127 characters.
Page LayoutUse this part of the screen to create a web page to display when access to a website is blocked due to a security service.
Use CustomizedSelect this if you want to specify a logo and colors in the access blocked web page. You cannot change the banner message.
Preview Web PageUse this to see how the colors look in your customized access blocked web page. The below example also shows the location of the access blocked message, the logo and banner.ZYXEL USGFLEX700-GB0101F - Notification &gt; Response Message - 1 Web access is restricted. Please contact the administrator.Category: PreviewBlocked URL: https://blocked preyiew(if you feel this site has been improperly categorized, please visit ... to submit a review.)
File PathType the path to the access blocked web page file or use Browse to find it on your computer.After, click Upload to send the file to the Zyxel Device.
Message ColorSpecify the font color of the message. You can use theColorpalette chooser, or enter a CSS hex color code. For example, the CSS hex color code for blue is #0000FF.
Background ColorSpecify the color of the access blocked web page background. You can use theColorpalette chooser, or enter a CSS hex color code. For example, the CSS hex color code for blue is #0000FF.
Banner ColorSpecify the color of the access blocked web page banner. You can use theColorpalette chooser, or enter a CSS hex color code. For example, the CSS hex color code for blue is #0000FF.
Banner Message ColorSpecify the color of the access blocked web page banner text. You can use theColorpalette chooser, or enter a CSS hex color code. For example, the CSS hex color code for blue is #0000FF.
Apply Click this button to save your changes to the Zyxel Device.
Reset Click this button to return the screen to its last-saved settings.

42.16 Language Screen

Click Configuration > System > Language to open the following screen. Use this screen to select a display language for the Zyxel Device's Web Configurator screens. Figure 609 Configuration > System > Language ![](images/d7079c2d79f8341a1f69e04af868904c1a14e4ad0d89a23f36c98701291655bb.jpg) The following table describes the labels in this screen. Table 394 Configuration > System > Language
LABEL DESCRIPTION
Language SettingSelect a display language for the Zyxel Device's Web Configurator screens. You also need to open a new browser session to display the screens in the new language.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

42.17 IPv6 Screen

Click Configuration > System > IPv6 to open the following screen. Use this screen to enable IPv6 support for the Zyxel Device's Web Configurator screens. Figure 610 Configuration > System > IPv6 ![](images/1e5ad5d6098ab3ff95d25e472d73ed42fc54181343f815f5d416f7f890dc3c14.jpg) The following table describes the labels in this screen. Table 395 Configuration > System > IPv6
LABEL DESCRIPTION
Enable IPv6Select this to have the Zyxel Device support IPv6 and make IPv6 settings be available on the screens that the functions support, such as theConfiguration > Network > Interface > Ethernet, VLAN, andBridgescreens. The Zyxel Device discards all IPv6 packets if you clear this check box.
ApplyClickApplyto save your changes back to the Zyxel Device.
ResetClickResetto return the screen to its last-saved settings.

42.18 Zyxel One Network (ZON) Utility

The Zyxel One Network (ZON) utility uses the Zyxel Discovery Protocol (ZDP) for discovering and configuring ZDP-aware Zyxel devices in the same broadcast domain as the computer on which ZON is installed. The ZON Utility issues requests via ZDP and in response to the query, the Zyxel device responds with basic information including IP address, firmware version, location, system and model name. The information is then displayed in the ZON Utility screen and you can perform tasks like basic configuration of the devices and batch firmware upgrade in it. You can download the ZON Utility at www.zyxel.com and install it on a computer.

42.18.1 Requirements

Before installing the ZON Utility on your computer, please make sure it meets the requirements listed below.

Operating System

At the time of writing, the ZON Utility is compatible with: - Windows 7 (both 32-bit / 64-bit versions) - Windows 8 (both 32-bit / 64-bit versions) - Windows 8.1 (both 32-bit / 64-bit versions) • Window 10 (both 32-bit / 64-bit versions) Note: To check for your Windows operating system version, right-click on My Computer > Properties. You should see this information in the General tab.

Hardware

Here are the minimum hardware requirements to use the ZON Utility on your computer. - Core i3 processor • 2 G B R A M • 100MB free hard disk • WXGA (Wide XGA 1280x800)

42.18.2 Run the ZON Utility

1 Double-click the ZON Utility to run it. 2 The first time you run the ZON Utility you will see if your Zyxel Device and firmware version support the ZON Utility. Click the OK button to close this screen. Figure 611 Supported Devices and Versions ![](images/181bb124f29f9f478a72f57ae227fa7c433045dd8cd38a4573c480580261cf0e.jpg) If you want to check the supported models and firmware versions later, you can click the Show information about ZON icon in the upper right hand corner of the screen. Then select the Supported model and firmware version link. If your device is not listed here, see the device release notes for ZON utility support. The release notes are in the firmware zip file on the Zyxel web site. Figure 612 ZON Utility Screen ![](images/c4f62efedf2167306ee773e0252fca7e9eb1f3ab3a41926e67ea03daba6b2241.jpg) 3 Select a network adapter to which your supported devices are connected. Figure 613 Network Adapter ![](images/0bedb746e68cb5ae4320f34d451cde910d41f09a5e25821b45997e976764fa10.jpg) 4 Click the Go button for the ZON Utility to discover all supported devices in your network. Figure 614 Discovery ![](images/207eace551ed35de838053613248d01903e86e5ac23ca77066e4c4733217c578.jpg) 5 The ZON Utility screen shows the devices discovered. Figure 615 ZON Utility Screen ![](images/2eca28c3d18298fd7f8128871f9e7ee41daf8cdff58b3e7f58f1fd864f9b2002.jpg) 6 Select a device and then use the icons to perform actions. Some functions may not be available for your devices. The following table describes the icons numbered from left to right in the ZON Utility screen. Table 396 ZON Utility Icons
ICON DESCRIPTION
1 IP configuration Changethe selected device's IP address.
2 Renew IP Address Updatea DHCP-assigned dynamic IP address.
Table 396 ZON Utility Icons
ICONDESCRIPTION
3 Reboot DeviceUse this icon to restart the selected device(s). This may be useful when troubleshooting or upgrading new firmware.
4 Reset Configuration to DefaultIf you forget your password or cannot access the Web Configurator, you can use this icon to reload the factory-default configuration file. This means that you will lose all configurations that you had previously.
5 Locator LEDUse this icon to locate the selected device by causing its Locator LED to blink.
6 Web GUIUse this to access the selected device web configurator from your browser. You will need a username and password to log in.
7 Firmware UpgradeUse this icon to upgrade new firmware to selected device(s) of the same model. Make sure you have downloaded the firmware from the Zyxel website to your computer and unzipped it in advance.If your Zyxel Device supports dual firmware images, the standby image will be upgraded. After the new firmware is uploaded, you Zyxel Device will reboot, and the new firmware will be the running firmware.
8 Change PasswordUse this icon to change the admin password of the selected device. You must know the current admin password before changing to a new one.
9 Configure NCC DiscoveryYou must have Internet access to use this feature. Use this icon to enable or disable the Nebula Control Center (NCC) discovery feature on the selected device. If it's enabled, the selected device will try to connect to the NCC. Once the selected device is connected to and has registered in the NCC, it'll go into the cloud management mode.
10 ZACUse this icon to run the Zyxel AP Configurator of the selected AP.
11 Clear and RescanUse this icon to clear the list and discover all devices on the connected network again.
12 Save ConfigurationUse this icon to save configuration changes to permanent memory on a selected device.
13 SettingsUse this icon to select a network adaptor for the computer on which the ZON utility is installed, and the utility language.
The following table describes the fields in the ZON Utility main screen. Table 397 ZON Utility Fields
LABEL DESCRIPTION
Type This field displays an icon of the kind of device discovered.
Model This field displays the model name of the discovered device.
Firmware Version This field displays the firmware version of the discovered device.
MAC Address This field displays the MAC address of the discovered device.
IP AddressThis field displays the IP address of an internal interface on the discovered device that first received an ZDP discovery request from the ZON utility.
System NameThis field displays the system name of the discovered device.
LocationThis field displays where the discovered device is.
StatusThis field displays whether changes to the discovered device have been done successfully. As the Zyxel Device does not support IP Configuration, Renew IP address and Flash Locator LED, this field displays "Update failed", "Not support Renew IP address" and "Not support Flash Locator LED" respectively.
NCC DiscoveryThis field displays if the discovered device supports the Nebula Control Center (NCC) discovery feature. If it's enabled, the selected device will try to connect to the NCC. Once the selected device is connected to and has registered in the NCC, it'll go into the cloud management mode.
Table 397 ZON Utility Fields
LABEL DESCRIPTION
Serial NumberEnter the admin password of the discovered device to display its serial number.
Hardware Version This fielddisplays the hardware version of the discovered device.

42.18.3 Zyxel One Network (ZON) System Screen

Enable ZDP (ZON) and Smart Connect (Ethernet Neighbor) in the System > ZON screen. See Monitor > System Status > Ethernet Neighbor for information on using Smart Connect (Link Layer Discovery Protocol (LLDP)) for discovering and configuring LLDP-aware devices in the same broadcast domain as the Zyxel Device that you're logged into using the web configurator. The following figure shows the System > ZON screen. Figure 616 Configuration > System > ZON ![](images/47865251234e22cc4fa3b5e11ea7a46498775ca5c0e54217901c9189fc9b709d.jpg) The following table describes the labels in this screen. Table 398 Configuration > System > ZON
LABEL DESCRIPTION
ZDPZyxel Discovery Protocol (ZDP) is the protocol that the Zyxel One Network (ZON) utility uses for discovering and configuring ZDP-aware Zyxel devices in the same broadcast domain as the computer on which ZON is installed.
EnableSelect to activate ZDP discovery on the Zyxel Device.
Smart ConnectSmart Connect uses Link Layer Discovery Protocol (LLDP) for discovering and configuring LLDP-aware devices in the same broadcast domain as the Zyxel Device that you're logged into using the web configurator.
EnableSelect to activate LLDP discovery on the Zyxel Device. See also Monitor > System Status > Ethernet Discovery.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

CHAPTER 43

Log and Report

43.1 Overview

Use these screens to configure daily reporting and log settings.

43.1.1 What You Can Do In this Chapter

- Use the Email Daily Report screen (Section 43.2 on page 902) to configure where and how to send daily reports and what reports to send. - Use the Log Setting screens (Section 43.3 on page 904) to specify settings for recording log messages and alerts, e-mailing them, storing them on a connected USB storage device, and sending them to remote syslog servers.

43.2 Email Daily Report

Use the Email Daily Report screen to start or stop data collection and view various statistics about traffic passing through your Zyxel Device. See Configuration > System > Notification to set up the mail server. Note: Data collection may decrease the Zyxel Device's traffic throughput rate. Click Configuration > Log & Report > Email Daily Report to display the following screen. Configure this screen to have the Zyxel Device email you system statistics every day. Figure 617 Configuration > Log & Report > Email Daily Report ![](images/2d5bdf73add655e4f4ce0331d105a978f2091a5a9c5f7dabcb6d46c9abb24b34.jpg) The following table describes the labels in this screen. Table 399 Configuration > Log & Report > Email Daily Report
LABEL DESCRIPTION
Enable Email Daily ReportSelect this to send reports by email every day.
Mail SubjectType the subject line for outgoing email from the Zyxel Device.
Mail ToType the email address (or addresses) to which the outgoing email is delivered.
Send Report NowClick this button to have the Zyxel Device send the daily email report immediately.
Report ItemsSelect the information to include in the report. Types of information include System Resource Usage, Wireless Report, Security Service, Interface Traffic Statistics and DHCP Table.Select Reset counters after sending report successfully if you only want to see statistics for a 24 hour period.
Reset All CountersClick this to discard all report data and start all of the counters over at zero.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

43.3 Log Setting Screens

The Log Setting screens control log messages and alerts. A log message stores the information for viewing or regular emailing later, and an alert is emailed immediately. Usually, alerts are used for events that require more serious attention, such as system errors and attacks. The Zyxel Device provides a system log and supports email profiles and remote syslog servers. View the system log in the MONITOR > Log screen. Use the email profiles to mail log messages to the specific destinations. You can also have the Zyxel Device store system logs on a connected USB storage device. The other four logs are stored on specified syslog servers. The Log Setting screens control what information the Zyxel Device saves in each log. You can also specify which log messages to email for the system log, and where and how often to email them. These screens also set for which events to generate alerts and where to email the alerts. The first Log Setting screen provides a settings summary. Use the Edit screens to configure settings such as log categories, email addresses, and server names for any log. Use the Log Category Settings screen to edit what information is included in the system log, USB storage, email profiles, and remote servers.

43.3.1 Log Setting Summary

To access this screen, click Configuration > Log & Report > Log Setting. Figure 618 Configuration > Log & Report > Log Setting ![](images/854589425332fe38261e0ead96447580683fb9ac93dbb8c32efd54db4a801485.jpg) The following table describes the labels in this screen. Table 400 Configuration > Log & Report > Log Setting
LABEL DESCRIPTION
EditDouble-click an entry or select it and click Edit to open a screen where you can modify it.
ActivateTo turn on an entry, select it and click Activate.
InactivateTo turn off an entry, select it and click Inactivate.
#This field is a sequential value, and it is not associated with a specific log.
StatusThe activate (light bulb) icon is lit when the entry is active and dimmed when the entry is inactive.
NameThis field displays the type of log setting entry (system log, logs stored on a USB storage device connected to the Zyxel Device, or one of the remote servers).
Log Format Thisfield displays the format of the log.Internal - system log; you can view the log on the View Log tab.VRPT/ Syslog - Zyxel's Vantage Report, syslog-compatible format.CEF/ Syslog - Common Event Format, syslog-compatible format.
SummaryThis field is a summary of the settings for each log. Please see Section 43.3.2 on page 905 for more information.
Log Category SettingsClick this button to open the Log Category Settings Edit screen.
ApplyClick this button to save your changes (activate and deactivate logs) and make them take effect.

43.3.2 Edit System Log Settings

The Log Settings Edit screen controls the detailed settings for each log in the system log (which includes the email profiles). Go to the Log Settings Summary screen (see Section 43.3.1 on page 904), and click the system log Edit icon. Figure 619 Configuration > Log & Report > Log Setting > Edit (System Log - E-mail Servers) ![](images/22fe104408d5e18b72f9e30531917e37590fd0540fd5f079fe9cf5ad02cce0da.jpg) Figure 620 Configuration > Log & Report > Log Setting > Edit (System Log) ![](images/aded264237d458f821fe616d96695c1eca15a1956c4970df376e50de5a566a89.jpg) Figure 621 Configuration > Log & Report > Log Setting > Edit (System Log - AP) ![](images/2d505b1fb7e499f52028167896e8f0ceb16c526cea795fff720cdf3f383af1d4.jpg) The following table describes the labels in this screen. Table 401 Configuration > Log & Report > Log Setting > Edit (System Log)
LABEL DESCRIPTION
E-Mail Server 1/2
ActiveSelect this to send log messages and alerts according to the information in this section. You specify what kinds of log messages are included in log information and what kinds of log messages are included in alerts in the Active Log and Alert section.
Mail ServerType the name or IP address of the outgoing SMTP server.
Mail Server PortEnter the same port number here as is on the mail server for mail traffic.
Mail Subject Type the subject line for the outgoing email.
Send FromType the email address from which the outgoing email is delivered. This address is used in replies.
Send Log ToType the email address to which the outgoing email is delivered.
Send Alerts To Type the email address to which alerts are delivered.
Sending LogSelect how often log information is emailed. Choices are: When Full, Hourly and When Full, Daily and When Full, and Weekly and When Full.
Day for Sending LogThis field is available if the log is emailed weekly. Select the day of the week the log is emailed.
Time for Sending LogThis field is available if the log is emailed weekly or daily. Select the time of day (hours and minutes) when the log is emailed. Use 24-hour notation.
SMTP AuthenticationSelect this check box if it is necessary to provide a user name and password to the SMTP server.
User NameThis box is effective when you select the SMTP Authentication check box. Type the user name to provide to the SMTP server when the log is emailed.
PasswordThis box is effective when you select the SMTP Authentication check box. Type the password of up to 63 characters to provide to the SMTP server when the log is emailed.
Retype to ConfirmType the password again to make sure that you have entered is correctly.
Active Log and Alert
System LogUse the System Log drop-down list to change the log settings for all of the log categories.disable all logs(red X)- do not log any information for any category for the system log or email any logs to email server 1 or 2.enable normal logs(green check mark)- create log messages and alerts for all categories for the system log. If email server 1 or 2 also has normal logs enabled, the Zyxel Device will email logs to them.enable normal logs and debug logs(yellow check mark)- create log messages, alerts, and debugging information for all categories. The Zyxel Device does not email debugging information, even if this setting is selected.
E-mail Server 1Use the E-Mail Server 1 drop-down list to change the settings for emailing logs to email server 1 for all log categories.Using the System Log drop-down list to disable all logs overrides your email server 1 settings.enable normal logs (green check mark) - email log messages for all categories to email server 1.enable alert logs (red exclamation point) - email alerts for all categories to email server 1.
E-mail Server 2Use the E-Mail Server 2 drop-down list to change the settings for emailing logs to email server 2 for all log categories.Using the System Log drop-down list to disable all logs overrides your email server 2 settings.enable normal logs (green check mark) - email log messages for all categories to email server 2.enable alert logs (red exclamation point) - email alerts for all categories to email server 2.
Log CategoryThis field displays each category of messages. It is the same value used in the Display and Category fields in the View Log tab. The Default category includes debugging messages generated by open source software.
System logSelect which events you want to log by Log Category. There are three choices:disable all logs (red X) - do not log any information from this categoryenable normal logs (green check mark) - create log messages and alerts from this categoryenable normal logs and debug logs (yellow check mark) - create log messages, alerts, and debugging information from this category; the Zyxel Device does not email debugging information, however, even if this setting is selected.
E-mail Server 1Select whether each category of events should be included in the log messages when it is emailed (green check mark) and/or in alerts (red exclamation point) for the email settings specified in E-Mail Server 1. The Zyxel Device does not email debugging information, even if it is recorded in the System log.
E-mail Server 2Select whether each category of events should be included in log messages when it is emailed (green check mark) and/or in alerts (red exclamation point) for the email settings specified in E-Mail Server 2. The Zyxel Device does not email debugging information, even if it is recorded in the System log.
Log Consolidation
ActiveSelect this to activate log consolidation. Log consolidation aggregates multiple log messages that arrive within the specified Log Consolidation Interval. In the View Log tab, the text “[count=x]”, where x is the number of original log messages, is appended at the end of the Message field, when multiple log messages were aggregated.
Log Consolidation IntervalType how often, in seconds, to consolidate log information. If the same log message appears multiple times, it is aggregated into one log message with the text “[count=x]”, where x is the number of original log messages, appended at the end of the Message field.
OK Click this to save your changes and return to the previous screen.
CancelClick this to return to the previous screen without saving your changes.

43.3.3 Edit Log on USB Storage Setting

The Edit Log on USB Storage Setting screen controls the detailed settings for saving logs to a connected USB storage device. Go to the Log Setting Summary screen (see Section 43.3.1 on page 904), and click the USB storage Edit icon. Figure 622 Configuration > Log & Report > Log Setting > Edit (USB Storage) ![](images/86bc918f4fe9cfab47bd767981ec862ab8aa9451c78717ca99a1c8b3897ca3bb.jpg) The following table describes the labels in this screen. Table 402 Configuration > Log & Report > Log Setting > Edit (USB Storage)
LABEL DESCRIPTION
Duplicate logs to USB storage (if ready)Select this to have the Zyxel Device save a copy of its system logs to a connected USB storage device. Use theActive Logsection to specify what kinds of messages to include.
Enable log keep durationSelect this checkbox to enter a value in theKeep Durationfield.
Keep Duration Entera number of days that the Zyxel Device keeps this log.
Active Log
SelectionUse theSelectiondrop-down list to change the log settings for all of the log categories.disable all logs(red X)- do not send the remote server logs for any log category.enable normal logs(green check mark)- send the remote server log messages and alerts for all log categories.enable normal logs and debug logs(yellow check mark)- send the remote server log messages, alerts, and debugging information for all log categories.
LABEL DESCRIPTION
Log CategoryThis field displays each category of messages. TheDefaultcategory includes debugging messages generated by open source software.
SelectionSelect what information you want to log from eachLog Category(except All Logs; see below). Choices are:disable all logs(red X) - do not log any information from this categoryenable normal logs(green check mark) - log regular information and alerts from this categoryenable normal logs and debug logs(yellow check mark) - log regular information, alerts, and debugging information from this category
OKClick this to save your changes and return to the previous screen.
CancelClick this to return to the previous screen without saving your changes.

43.3.4 Edit Remote Server Log Settings

The Log Settings Edit screen controls the detailed settings for each log in the remote server (syslog). Go to the Log Settings Summary screen (see Section 43.3.1 on page 904), and click a remote server Edit icon. Figure 623 Configuration > Log & Report > Log Setting > Edit (Remote Server - AC) ![](images/18851ccf566e1f53de334857229f72a4f61850ba3d1e41d7f3f49ccd9538cb8e.jpg) Configuration > Log & Report > Log Setting > Edit (Remote Server - AP) ![](images/724267b43499b5195678bafe0117d2a04d34be200e1c9023c967d4354d4136e4.jpg) The following table describes the labels in this screen. Table 403 Configuration > Log & Report > Log Setting > Edit (Remote Server)
LABEL DESCRIPTION
Log Settings for Remote Server
ActiveSelect this check box to send log information according to the information in this section. You specify what kinds of messages are included in log information in the Active Log section.
Log FormatThis field displays the format of the log information. It is read-only.VRPT/ Syslog - Zyxel's Vantage Report, syslog-compatible format.CEF/ Syslog - Common Event Format, syslog-compatible format.
Server AddressType the server name or the IP address of the syslog server to which to send log information.
Server Port Typethe service port number used by the remote server.
Log FacilitySelect a log facility. The log facility allows you to log the messages to different files in the syslog server. Please see the documentation for your syslog program for more information.
Active Log
SelectionUse the Selection drop-down list to change the log settings for all of the log categories.disable all logs(red X) - do not send the remote server logs for any log category.enable normal logs(green check mark) - send the remote server log messages and alerts for all log categories.enable normal logs and debug logs(yellow check mark) - send the remote server log messages, alerts, and debugging information for all log categories.
Log CategoryThis field displays each category of messages. It is the same value used in the Display and Category fields in the View Log tab. The Default category includes debugging messages generated by open source software.
SelectionSelect what information you want to log from each Log Category(except All Logs:see below).Choices are:disable all logs(red X) - do not log any information from this categoryenable normal logs(green check mark) - log regular information and alerts from this categoryenable normal logs and debug logs(yellow check mark) - log regular information, alerts, and debugging information from this category
OK Click this to save your changes and return to the previous screen.
CancelClick this to return to the previous screen without saving your changes.

43.3.5 Log Category Settings Screen

The Log Category Settings screen allows you to view and to edit what information is included in the system log, USB storage, email profiles, and remote servers at the same time. It does not let you change other log settings (for example, where and how often log information is emailed or remote server names). To access this screen, go to the Log Settings Summary screen (see Section 43.3.1 on page 904), and click the Log Category Settings button. Figure 624 Log Category Settings AC ![](images/90a604c9d07dbf69c3857f486238a5d426f92a0197afc94efb5c6a6feaa206b2.jpg)
line | Category | log Categor | log Categor 1 | log Categor 2 | log Categor 3 | log Categor 4 | log Categor 5 | log Categor 6 | log Categor 7 | log Categor 8 | log Categor 9 | log Categor 10 | |-----------------|-------------|---------------|---------------|---------------|---------------|---------------|---------------|---------------|---------------|---------------|----------------| | Auth | | | | | | | | | | | | | BWM | | | | | | | | | | | | | File manager | | | | | | | | | | | | | Hotpot | | | | | | | | | | | | | License | | | | | | | | | | | | | Log & Report | | | | | | | | | | | | | Network | | | | | | | | | | | | | Security | | | | | | | | | | | | | System | | | | | | | | | | | | | Security Service| | | | | | | | | | | | | VPN | | | | | | | | | | | | | Wireless | | | | | | | | | | | | | (Line) | | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 )
Figure 625 Log Category Settings AP ![](images/bfa0bf1ec7bea9016b7c04156a164d380e5a198fae3cc05fb26672ec8c490fed.jpg) This screen provides a different view and a different way of indicating which messages are included in each log and each alert. Please see Section 43.3.2 on page 905, where this process is discussed. (The Default category includes debugging messages generated by open source software.) The following table describes the fields in this screen. Table 404 Configuration > Log & Report > Log Setting > Log Category Settings
LABEL DESCRIPTION
System LogUse the System Log drop-down list to change the log settings for all of the log categories.disable all logs (red X) - do not log any information for any category for the system log or email any logs to email server 1 or 2.enable normal logs (green check mark) - create log messages and alerts for all categories for the system log. If email server 1 or 2 also has normal logs enabled, the Zyxel Device will email logs to them.enable normal logs and debug logs (yellow check mark) - create log messages, alerts, and debugging information for all categories. The Zyxel Device does not email debugging information, even if this setting is selected.
USB StorageUse the USB Storage drop-down list to change the log settings for saving logs to a connected USB storage device.disable all logs (red X) - do not log any information for any category to a connected USB storage device.enable normal logs (green check mark) - create log messages and alerts for all categories and save them to a connected USB storage device.enable normal logs and debug logs (yellow check mark) - create log messages, alerts, and debugging information for all categories and save them to a connected USB storage device.
E-mail Server 1 E-mailUse the E-Mail Server 1 drop-down list to change the settings for emailing logs to email server 1 for all log categories.Using the System Log drop-down list to disable all logs overrides your email server 1 settings.enable normal logs (green check mark) - email log messages for all categories to email server 1.enable alert logs (red exclamation point) - email alerts for all categories to email server 1.
E-mail Server 2 E-mailUse the E-Mail Server 2 drop-down list to change the settings for emailing logs to email server 2 for all log categories.Using the System Log drop-down list to disable all logs overrides your email server 2 settings.enable normal logs (green check mark) - email log messages for all categories to email server 2.enable alert logs (red exclamation point) - email alerts for all categories to email server 2.
Remote Server 1~4 SyslogFor each remote server, use the Selection drop-down list to change the log settings for all of the log categories.disable all logs (red X) - do not send the remote server logs for any log category.enable normal logs (green check mark) - send the remote server log messages and alerts for all log categories.enable normal logs and debug logs (yellow check mark) - send the remote server log messages, alerts, and debugging information for all log categories.
Log CategoryThis field displays each category of messages. It is the same value used in the Display and Category fields in the View Log tab. The Default category includes debugging messages generated by open source software.
System LogSelect which events you want to log by Log Category. There are three choices:disable all logs (red X) - do not log any information from this categoryenable normal logs (green check mark) - create log messages and alerts from this categoryenable normal logs and debug logs (yellow check mark) - create log messages, alerts, and debugging information from this category; the Zyxel Device does not email debugging information, however, even if this setting is selected.
USB StorageSelect which event log categories to save to a connected USB storage device. There are three choices:disable all logs(red X) - do not log any information from this categoryenable normal logs(green check mark) - save log messages and alerts from this categoryenable normal logs and debug logs(yellow check mark) - save log messages, alerts, and debugging information from this category.
E-mail Server 1 E-mailSelect whether each category of events should be included in the log messages when it is emailed (green check mark) and/or in alerts (red exclamation point) for the email settings specified in E-Mail Server 1. The Zyxel Device does not email debugging information, even if it is recorded in the System log.
E-mail Server 2 E-mailSelect whether each category of events should be included in log messages when it is emailed (green check mark) and/or in alerts (red exclamation point) for the email settings specified in E-Mail Server 2. The Zyxel Device does not email debugging information, even if it is recorded in the System log.
Remote Server 1~4 SyslogFor each remote server, select what information you want to log from each Log Category(except All Logs; see below). Choices are:disable all logs(red X) - do not log any information from this categoryenable normal logs(green check mark) - log regular information and alerts from this categoryenable normal logs and debug logs(yellow check mark) - log regular information, alerts, and debugging information from this category
OK Click this to save your changes and return to the previous screen.
CancelClick this to return to the previous screen without saving your changes.

CHAPTER 44

File Manager

44.1 Overview

Configuration files define the Zyxel Device's settings. Shell scripts are files of commands that you can store on the Zyxel Device and run when you need them. You can apply a configuration file or run a shell script without the Zyxel Device restarting. You can store multiple configuration files and shell script files on the Zyxel Device. You can edit configuration files or shell scripts in a text editor and upload them to the Zyxel Device. Configuration files use a .conf extension and shell scripts use a .zysh extension.

44.1.1 What You Can Do in this Chapter

- Use the Configuration File screen (see Section 44.2 on page 917) to store and name configuration files. You can also download configuration files from the Zyxel Device to your computer and upload configuration files from your computer to the Zyxel Device. - Use the Firmware Package screen (see Section 44.3 on page 922) to check your current firmware version and upload firmware to the Zyxel Device. - Use the Shell Script screen (see Section 44.4 on page 928) to store, name, download, upload and run shell script files.

44.1.2 What you Need to Know

Configuration Files and Shell Scripts

When you apply a configuration file, the Zyxel Device uses the factory default settings for any features that the configuration file does not include. When you run a shell script, the Zyxel Device only applies the commands that it contains. Other settings do not change. These files have the same syntax, which is also identical to the way you run CLI commands manually. An example is shown below. Figure 626 Configuration File / Shell Script: Example
<h1 id="enter-configuration-mode">enter configuration mode</h1>
configure terminal
<h1 id="change-administrator-password">change administrator password</h1>
username admin password 4321 user-type admin
<h1 id="configure-ge3">configure ge3</h1>
interface ge3
ip address 172.23.37.240 255.255.255.0
ip gateway 172.23.37.254 metric 1
exit
<h1 id="create-address-objects-for-remote-management-to-zywall-firewall-rules">create address objects for remote management / to-ZyWALL firewall rules</h1>
<h1 id="use-the-address-group-in-case-we-want-to-open-up-remote-management-later">use the address group in case we want to open up remote management later</h1>
address-object TW_SUBNET 172.23.37.0/24
object-group address TW_TEAM
address-object TW_SUBNET
exit
<h1 id="enable-telnet-access-not-enabled-by-default-unlike-other-services">enable Telnet access (not enabled by default, unlike other services)</h1>
ip telnet server
<h1 id="open-wan-to-zywall-firewall-for-tw_team-for-remote-management">open WAN-to-ZyWALL firewall for TW_TEAM for remote management</h1>
firewall WAN ZyWALL insert 4
sourceip TW_TEAM
service TELNET
action allow
exit
write 
While configuration files and shell scripts have the same syntax, the Zyxel Device applies configuration files differently than it runs shell scripts. This is explained below. Table 405 Configuration Files and Shell Scripts in the Zyxel Device
Configuration Files (.conf) Shell Scripts (.zysh)

- Resets to default configuration.
- G o e s i n t o C L I Configuration mode commands in the shell script.
- Runs the commands in the configuration file.

• G o e s i n t o C L I Privilege mode. 
You have to run the example in Figure 626 on page 916 as a shell script because the first command is run in Privilege mode. If you remove the first command, you have to run the example as a configuration file because the rest of the commands are executed in Configuration mode.

Comments in Configuration Files or Shell Scripts

In a configuration file or shell script, use “#” or “!” as the first character of a command line to have the Zyxel Device treat the line as a comment. Your configuration files or shell scripts can use "exit" or a command line consisting of a single "!" to have the Zyxel Device exit sub command mode. Note: "exit" or "!" must follow sub commands if it is to make the Zyxel Device exit sub command mode. Line 3 in the following example exits sub command mode.
interface gel
ip address dhcp
! 
Lines 1 and 3 in the following example are comments and line 4 exits sub command mode.
!
interface gel
<h1 id="this-interface-is-a-dhcp-client">this interface is a DHCP client</h1>
! 
Lines 1 and 2 are comments. Line 5 exits sub command mode.
! this is from Joe
<h1 id="on-20080405">on 2008/04/05</h1>
interface ge1
ip address dhcp
! 

Errors in Configuration Files or Shell Scripts

When you apply a configuration file or run a shell script, the Zyxel Device processes the file line-by-line. The Zyxel Device checks the first line and applies the line if no errors are detected. Then it continues with the next line. If the Zyxel Device finds an error, it stops applying the configuration file or shell script and generates a log. You can change the way a configuration file or shell script is applied. Include setenv stop-on-error off in the configuration file or shell script. The Zyxel Device ignores any errors in the configuration file or shell script and applies all of the valid commands. The Zyxel Device still generates a log for any errors.

44.2 The Configuration Screen

Click Maintenance > File Manager > Configuration File > Configuration to open the Configuration screen. Use the Configuration screen to store, run, and name configuration files. You can also download configuration files from the Zyxel Device to your computer and upload configuration files from your computer to the Zyxel Device. Once your Zyxel Device is configured and functioning properly, it is highly recommended that you back up your configuration file before making further configuration changes. The backup configuration file will be useful in case you need to return to your previous settings. Filenames beginning with autoback are automatic configuration files created when new firmware is uploaded. backup-yyyy-mm-dd-hh-mm-ss.conf is the name of the automatic backup when a secure policy is added or changed. Select a configuration file, then click Apply to apply the file to the Zyxel Device.

Configuration File Flow at Restart

- If there is not a startup-config.conf when you restart the Zyxel Device (whether through a management interface or by physically turning the power off and back on), the Zyxel Device uses the system-default.conf configuration file with the Zyxel Device's default settings. - If there is a startup-config.conf, the Zyxel Device checks it for errors and applies it. If there are no errors, the Zyxel Device uses it and copies it to the lastgood.conf configuration file as a back up file. If there is an error, the Zyxel Device generates a log and copies the startup-config.conf configuration file to the startup-config-bad.conf configuration file and tries the existing lastgood.conf configuration file. If there isn't a lastgood.conf configuration file or it also has an error, the Zyxel Device applies the system-default.conf configuration file. - You can change the way the startup-config.conf file is applied. Include the setenv-startup stop-on-error off command. The Zyxel Device ignores any errors in the startup-config.conf file and applies all of the valid commands. The Zyxel Device still generates a log for any errors. Figure 627 Maintenance > File Manager > Configuration File ![](images/c22d428ebbcfbeaf5de62be07fee4cbda2348be55ed8544a56e097bab44fab38.jpg) Do not turn off the Zyxel Device while configuration file upload is in progress. The following table describes the labels in this screen. Table 406 Maintenance > File Manager > Configuration File
LABEL DESCRIPTION
RenameUse this button to change the label of a configuration file on the Zyxel Device. You can only rename manually saved configuration files. You cannot rename thelastgood.conf,system-default.confandstartup-config.conffiles.You cannot rename a configuration file to the name of another configuration file in the Zyxel Device.Click a configuration file's row to select it and clickRenameto open theRename Fliescreen.Figure 628 Maintenance > File Manager > Configuration File > Rename
Specify the new name for the configuration file. Use up to 63 characters (including a-zA-Z0-9;~!@#%^&()_+[]'',=-).ClickOKto save the duplicate or clickCancelto close the screen without saving a duplicate of the configuration file.
RemoveClick a configuration file's row to select it and clickRemoveto delete it from the Zyxel Device. You can only delete manually saved configuration files. You cannot delete thesystem-default.conf,startup-config.confandlastgood.conffiles.A pop-up window asks you to confirm that you want to delete the configuration file. ClickOKto delete the configuration file or clickCancelto close the screen without deleting the configuration file.
DownloadClick a configuration file's row to select it and clickDownloadto save the configuration to your computer.
CopyUse this button to save a duplicate of a configuration file on the Zyxel Device.Click a configuration file's row to select it and clickCopyto open theCopy Fliescreen.Figure 629 Maintenance > File Manager > Configuration File > Copy
Specify a name for the duplicate configuration file. Use up to 63 characters (including a-zA-Z0-9;~!@#%^&()_+[]{'',=-).ClickOKto save the duplicate or clickCancelto close the screen without saving a duplicate of the configuration file.
Apply Use this button to have the Zyxel Device use a specific configuration file.Click a configuration file's row to select it and clickApplyto have the Zyxel Device use that configuration file. The Zyxel Device does not have to restart in order to use a different configuration file, although you will need to wait for a few minutes while the system reconfigures.The following screen gives you options for what the Zyxel Device is to do if it encounters an error in the configuration file.Figure 630 Maintenance > File Manager > Configuration File > Apply
> Apply Configuration FileApply Configuration FileFile Name: outabackup-4.30.confIf applying the configuration file encounters an error:○ Immediately stop applying the configuration file○ Immediately stop applying the configuration file and roll back to the previous configuration○ Ignore errors and finish applying the configuration file○ Ignore errors and finish applying the configuration file and then roll back to the previous configurationOK Cancel
Immediately stop applying the configuration file - this is not recommended because it would leave the rest of the configuration blank. If the interfaces were not configured before the first error, the console port may be the only way to access the device.Immediately stop applying the configuration file and roll back to the previous configuration - this gets the Zyxel Device started with a fully valid configuration file as quickly as possible.Ignore errors and finish applying the configuration file - this applies the valid parts of the configuration file and generates error logs for all of the configuration file's errors. This lets the Zyxel Device apply most of your configuration and you can refer to the logs for what to fix.Ignore errors and finish applying the configuration file and then roll back to the previous configuration - this applies the valid parts of the configuration file, generates error logs for all of the configuration file's errors, and starts the Zyxel Device with a fully valid configuration file.Click OK to have the Zyxel Device start applying the configuration file or click Cancel to close the screen
#This column displays the number for each configuration file entry. This field is a sequential value, and it is not associated with a specific address. The total number of configuration files that you can save depends on the sizes of the configuration files and the available flash storage space.
File NameThis column displays the label that identifies a configuration file.You cannot delete the following configuration files or change their file names.Thesystem-default.conffile contains the Zyxel Device's default settings. Select this file and clickApplyto reset all of the Zyxel Device settings to the factory defaults. This configuration file is included when you upload a firmware package.Thestartup-config.conffile is the configuration file that the Zyxel Device is currently using. If you make and save changes during your management session, the changes are applied to this configuration file. The Zyxel Device applies configuration changes made in the Web Configurator to the configuration file when you clickApplyor OK. It applies configuration changes made via commands when you use the write command.Thelastgood.confis the most recently used (valid) configuration file that was saved when the device last restarted. If you upload and apply a configuration file with an error, you can apply lastgood.conf to return to a valid configuration.
Size This column displays the size (in KB) of a configuration file.
Last ModifiedThis column displays the date and time that the individual configuration files were last changed or saved.
Upload Configuration FileThe bottom part of the screen allows you to upload a new or previously saved configuration file from your computer to your Zyxel DeviceYou cannot upload a configuration file named system-default.conf or lastgood.conf.If you upload startup-config.conf, it will replace the current configuration and immediately apply the new settings.
File PathType in the location of the file you want to upload in this field or click Browse ... to find it.
Browse...Click Browse... to find the .conf file you want to upload. The configuration file must use a ".conf" filename extension. You will receive an error message if you try to upload a file of a different format. Remember that you must decompress compressed (.zip) files before you can upload them.
UploadClick Upload to begin the upload process. This process may take up to two minutes.

44.2.1 The Configuration Schedule Backup Screen

Use the Schedule Backup screen to automatically back up the current Zyxel Device configuration file according to a schedule, and then send it to the configured email addresses. Figure 631 Maintenance > File Manager > Configuration File > Schedule Backup ![](images/95a4f9bc488a1bdf75e56b489acb141b5c1c2ef40c6edbb7681f05070d182dbf.jpg) The following table describes the labels in this screen. Table 407 Maintenance > File Manager > Configuration File> Schedule Backup
LABEL DESCRIPTION
Configure Backup Schedule
Mail SubjectEnter a email subject text with 1-60 characters. It may consist of letters, numbers, and the following special characters: '()+.,/:=?;!*#@$%-
Mail ToEnter the receiving email address. You and send the configuration file to a maximum of five email addresses.
E-mail Content Enter the backup email body text consists of 1-250 ASCII characters.
Enable Auto BackupSelect the check box to back up the configuration file at a user defined schedule.Note: After the first backup, the back up only occurs if the configuration file is different from the previous backed up configuration file.
DailySet the Zyxel Device to back up its configuration file once a day at the specified hour and minute.
WeeklySet the Zyxel Device to back up its configuration file once a week on the specified day, at the specified hour and minute.
MonthlySet the Zyxel Device to back up its configuration file once a month on the specified day, at the a specified hour and minute.Note: If the date you select is greater than the number of days in a month, the Zyxel Device automatically backs up its configuration file on the last day of the month. For example, if you select 31 and the month is February, the Zyxel Device backs up its configuration file on day 28 or 29.
Send EmailSelect the check box to have the Zyxel Device sends the current configuration file to the configured email addresses.
Encryption passwordEnter a password consists of 1-31 ASCII characters to add an encryption password to the configuration file in the email.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.

44.3 Firmware Management

Use the Firmware Management screen to check your current firmware version and upload firmware to the Zyxel Device. You can upload firmware to be the Running firmware or Standby firmware. Note: The Web Configurator is the recommended method for uploading firmware. You only need to use the command line interface if you need to recover the firmware. See the CLI Reference Guide for how to determine if you need to recover the firmware and how to recover it. Find the firmware file in a folder that (usually) uses the system model name with the model code and a bin extension. For example, a firmware for ZyWALL VPN100 is "430ABFV0b2s1.bin". The Zyxel Device's firmware package cannot go through the Zyxel Device when you enable the anti-malware Destroy compressed files that could not be decompressed option. The Zyxel Device classifies the firmware package as not being able to be decompressed and deletes it. You can upload the firmware package to the Zyxel Device with the option enabled, so you only need to clear the Destroy compressed files that could not be decompressed option while you download the firmware package. See Section 33.2 on page 625 for more on the anti-malware Destroy compressed files that could not be decompressed option.

The firmware update can take up to five minutes. Do not turn off or reset the Zyxel Device while the firmware update is in progress!

If your Zyxel Device has two firmware images installed, and one fails to boot (kernel crash, kernel panic, out-of-memory etc.), then the Zyxel Device will automatically use the (good) backup image to boot.

44.3.1 Cloud Helper

Cloud Helper lets you know if there is a later firmware available on the Cloud Helper server and lets you download it if there is. Note: Go to myZyxel, create an account and register your Zyxel Device first. Then you will be able to see links to and get notifications on new firmware available. At the time of writing, the Firmware Upgrade license providing Cloud Helper new firmware notifications is free when you register your Zyxel Device. The license does not expire if you have firmware version 4.32 patch 1 and later. The following table explains the Upgrade icons in the web configurator. Table 408 Cloud Helper Firmware Icons
Cloud Helper NewZYXEL USGFLEX700-GB0101F - Cloud Helper - 1A later firmware is available on the Cloud Helper Server. Click this icon to display aWhat's Newpop-up screen. You need a Firmware Upgrade license to upgrade the firmware. If you do not have a license,Upgrade Nowis grayed out. If you have a license, clickUpgrade Nowto directly upgrade firmware to the standby partition and have the Zyxel Device reboot automatically so that the new standby firmware becomes the running firmware. The previous running firmware becomes the standby firmware.If you haven't registered the Zyxel Device, a message will appear and remind you to register it. Also,Upgrade Nowis grayed out.ZYXEL USGFLEX700-GB0101F - Cloud Helper - 2
Table 408 Cloud Helper Firmware Icons
Cloud Helper DownloadingZYXEL USGFLEX700-GB0101F - Cloud Helper - 3Cloud firmware is being downloaded from the Cloud Helper Server. If you select another partition or the local firmware upgrade icon, you will see the following warning message.ZYXEL USGFLEX700-GB0101F - Cloud Helper - 4When firmware is downloading, you can pause, resume, stop or retry the firmware download.ZYXEL USGFLEX700-GB0101F - Cloud Helper - 5
Local FirmwareZYXEL USGFLEX700-GB0101F - Cloud Helper - 6Use this if you have already downloaded the latest firmware from the Zyxel website to your computer and unzipped it.Click the icon and then browse to the location of the unzipped files.ZYXEL USGFLEX700-GB0101F - Cloud Helper - 7If you upload the latest firmware to the running partition, the Zyxel Device will reboot automatically when it finishes uploading.If you upload the latest firmware to the standby partition, a message will appear to ask if you want to reboot the Zyxel Device.ZYXEL USGFLEX700-GB0101F - Cloud Helper - 8

44.3.2 The Firmware Management Screen

Click Maintenance > File Manager > Firmware Management to open the Firmware Management screen. Figure 632 Maintenance > File Manager > Firmware Management ![](images/c733c3bf18179d9c306f33f498fda4e7e8a097a51c7c8fbbf370089339cfa78f.jpg) The following table describes the labels in this screen. Table 409 Maintenance > File Manager > Firmware Management
LABEL DESCRIPTION
Firmware Status
RebootClick the Reboot icon to restart the Zyxel Device. If you applied changes in the Web configurator, these were saved automatically and do not change when you reboot. If you made changes in the CLI, however, you have to use the write command to save the configuration before you reboot. Otherwise, the changes are lost when you reboot.If you want the Standby firmware to be the Running firmware, then select the Standby firmware row and click Reboot. Wait a few minutes until the login screen appears. If the login screen does not appear, clear your browser cache and refresh the screen or type the IP address of the Zyxel Device in your Web browser again.You can also use the CLI command reboot to restart the Zyxel Device.
#This displays the system space (partition) index number where the firmware is located. The firmware can be either Standby or Running; only one firmware can be running at any one time.
StatusThis indicates whether the firmware is Running, or not running but already uploaded to the Zyxel Device and is on Standby. It displays N/A if there is no firmware uploaded to that system space.
ModelThis is the model name of the device which the firmware is running on.
Version This is the firmware version and the date created.
Released DateThis is the date that the version of the firmware was created.
UpgradeA cloud helper icon displays if there is a later firmware on the Cloud Server than the firmware in the partition. Click the cloud helper icon to download a later firmware from the Cloud Helper Server.Use the local firmware icon if you have already downloaded the latest firmware from the Zyxel website to your computer and unzipped it.
Cloud Firmware InformationYou must register your Zyxel Device at myZyxel first to use cloud firmware.
Latest VersionThis displays the latest firmware version at the Cloud Helper Server. Click Check Now to see if there is a later firmware at the Cloud Server.
Release DateThis displays the date the latest firmware version was made available.
Release NoteThe release note contains details of latest firmware version such as new features and bug fixes.
Auto UpdateSelect this check box to have the Zyxel Device automatically check for and download new firmware to the standby partition at the time and day specified.You should select a time when your network is not busy for minimal interruption.Note: You cannot enable Auto Update in File Manager > Firmware Management and Schedule Reboot in Maintenance > Shutdown-Reboot at the same time.
DailySelect this option to have the Zyxel Device check for new firmware every day at the specified time. The time format is the 24 hour clock, so ‘0’ means midnight for example.
WeeklySelect this option to have the Zyxel Device check for new firmware once a week on the day and at the time specified.
Auto RebootSelect this to have the newly downloaded firmware in the standby partition become the running firmware after the Zyxel Device automatically restarts.
Firmware Upgrade Service Status
Service StatusThis field displays whether the firmware license service is activated at myZyxel (Activated) or not (Not Activated).
After you see the Firmware Upload in Process screen, wait a few minutes before logging into the Zyxel Device again. Figure 633 Firmware Upload In Process ![](images/4d5a6aac768bafe16d6ef8f0ab25c553c313411c68907db26bc9492dc5b03e93.jpg) Note: The Zyxel Device automatically reboots after a successful upload. The Zyxel Device automatically restarts causing a temporary network disconnect. In some operating systems, you may see the following icon on your desktop. Figure 634 Network ![](images/a3e3440bfad657d75532ad536e26815c0fcf79af94ad3e5013ebae41d6cc38a7.jpg) After five minutes, log in again and check your new firmware version in the Dashboard screen. If the upload was not successful, the following message appears in the status bar at the bottom of the screen. Figure 635 Firmware Upload Error ![](images/c54db5605ea504c889e1614ef761f0a5df5fdad6603a4a87b17a3d25570fe54c.jpg)

44.3.3 Firmware Upgrade via USB Stick

In addition to uploading firmware via the web configurator or console port (see the CLI Reference Guide), you can also upload firmware directly from a USB stick connected to the Zyxel Device. 1 Create a folder on the USB stick called '/[ProductName\_dir]/firmware'. For example, if your Zyxel Device is USG110, then create a '/usg110\_dir/firmware/' folder on the stick. 2 Put one firmware 'bin' file into the firmware folder. Make sure the firmware ID and version number are correct for your model (the firmware ID is in brackets after the firmware version number - for USG100 it is AAPH). Note: Do not put more than one firmware 'bin' file into the firmware folder. The firmware version in the USB stick must be different to the currently running firmware. If the firmware on the USB stick is older, then the Zyxel Device will 'upgrade' to the older version. It is recommended that the firmware on the USB stick be the latest firmware version. 3 Insert the USB stick into the Zyxel Device. The firmware uploads to the standby system space. 4 The SYS LED blinks when the Zyxel Device automatically reboots making the upgraded firmware in standby become the running firmware. Note: If the startup-config.conf configuration file has problems and you are upgrading to 4.25 or later firmware, then the Zyxel Device will revert (failover) to the previously running firmware. If the startup-config.conf configuration file has problems and you are upgrading to earlier than 4.25 firmware, then the Zyxel Device uses the new earlier firmware, but generates a log and tries the existing lastgood.conf configuration file. If there isn't a lastgood.conf configuration file or it also has an error, the Zyxel Device applies the system-default.conf configuration file.

44.4 The Shell Script Screen

Use shell script files to have the Zyxel Device execute commands that you specify. Use a text editor to create the shell script files. They must use a “.zysh” filename extension. Click Maintenance > File Manager > Shell Script to open the Shell Script screen. Use the Shell Script screen to store, name, download, upload and run shell script files. You can store multiple shell script files on the Zyxel Device at the same time. Note: You should include write commands in your scripts. If you do not use the write command, the changes will be lost when the Zyxel Device restarts. You could use multiple write commands in a long script. See Section 45.2.1 on page 931 for more information on scripts. Figure 636 Maintenance > File Manager > Shell Script ![](images/e01765aaef2be445c192451f29c6ba035c13a4f71c611b4704267e0836986605.jpg) Each field is described in the following table. Table 410 Maintenance > File Manager > Shell Script
LABEL DESCRIPTION
RenameUse this button to change the label of a shell script file on the Zyxel Device.You cannot rename a shell script to the name of another shell script in the Zyxel Device.Click a shell script's row to select it and clickRename to open theRename Fliesscreen.Figure 637 Maintenance > File Manager > Shell Script > Rename
Specify the new name for the shell script file. Use up to 63 characters (including a-zA-Z0-9;~!@#%^&()_+[]''.=-).ClickOKto save the duplicate or clickCancelto close the screen without saving a duplicate of the configuration file.
RemoveClick a shell script file's row to select it and clickRemoveto delete the shell script file from the Zyxel Device.A pop-up window asks you to confirm that you want to delete the shell script file. ClickOKto delete the shell script file or clickCancelto close the screen without deleting the shell script file.
DownloadLABEL DESCRIPTIONClick a shell script file's row to select it and clickDownloadto save the configuration to your computer.
CopyUse this button to save a duplicate of a shell script file on the Zyxel Device.Click a shell script file's row to select it and clickCopyto open theCopyFilescreen.Figure 638 Maintenance > File Manager > Shell Script > CopyCopy File Source file : Guest_wifi_timeup.zyshTarget file :OK Cancel
Specify a name for the duplicate file. Use up to 63 characters (including a-zA-Z0-9;~!@#%^&()_+[]{'',=-}.ClickOKto save the duplicate or clickCancelto close the screen without saving a duplicate of the configuration file.
ApplyUse this button to have the Zyxel Device use a specific shell script file.Click a shell script file's row to select it and clickApplyto have the Zyxel Device use that shell script file. You may need to wait awhile for the Zyxel Device to finish applying the commands.
File NameThis column displays the label that identifies a shell script file.
Size This column displays the size (in KB) of a shell script file.
Last ModifiedThis column displays the date and time that the individual shell script files were last changed or saved.
Upload Shell ScriptThe bottom part of the screen allows you to upload a new or previously saved shell script file from your computer to your Zyxel Device.
File PathType in the location of the file you want to upload in this field or clickBrowse... to find it.
Browse...ClickBrowse... to find the .zysh file you want to upload.
UploadClickUploadto begin the upload process. This process may take up to several minutes.

CHAPTER 45 Diagnostics

45.1 Overview

Use the diagnostics screens for troubleshooting.

45.1.1 What You Can Do in this Chapter

- Use the Diagnostics screens (see Section 45.2 on page 931) to generate a file containing the Zyxel Device's configuration and diagnostic information if you need to provide it to customer support during troubleshooting. - Use the Packet Capture screens (see Section 45.3 on page 937) to capture packets going through the Zyxel Device. - Use the CPU / Memory Status screens (see Section 45.4 on page 944) to view the CPU and memory performance of various applications on the Zyxel Device. - Use the System Logs screen (see Section 45.5 on page 946) to see system logs stored on a connected USB storage device on the Zyxel Device. - Use the Network Tool screen (see Section 45.6 on page 946) to ping an IP address or trace the route packets take to a host. - Use the Routing Traces screens (see Section 45.7 on page 949) to configure traceroute to identify where packets are dropped for troubleshooting. - Use the Wireless Frame Capture screens (see Section 45.8 on page 950) to capture network traffic going through the AP interfaces connected to your Zyxel Device.

45.2 The Diagnostics Screens

The Diagnostics screens provide an easy way for you to generate a file containing the Zyxel Device's configuration and diagnostic information. You may need to send this file to customer support for troubleshooting.

45.2.1 Scripts

Use scripts to gather information on the Zyxel Device or on external APs connected to the Zyxel Device. Use a notepad editor that supports Unicode, such as Notepad to create a script. Each command in a script must be on its own line and the file must end with an empty line. The script must be saved in Unicode format (UTF-8). This is an example of a script to display information about the Zyxel Device.
show service-register status all
show myzyxel-service get-cloud-timezone
show cloud-helper firmware
show cloud-helper remind 
This is an example of a default script with interface diagnostic commands.
debug interface ifconfig
debug interface show event_sink
debug interface show interface_obj
debug switch table
debug switch port_groupping
show ping-check status
debug system netstat interface
show interface all
show port status 

Script Name

The script name must use a ".zysh" filename extension with a file name of up to 25 characters (including a-z, A-Z, 0-9 and ;'\~!@#\$%^&()\_+[]{'',=-). Spaces are allowed

Script Uploads to the Zyxel Device

You can upload scripts in File Manager > Shell Script to run commands on the Zyxel Device. You can also copy, and download scripts here. Upload a script in Diagnostics > Controller to generate information about the Zyxel Device own configuration and diagnostics. Upload a script in Diagnostics > AP to generate information about the selected managed AP in Diagnostics > AP.

Script Output

The results of generating a script are shown in Diagnostics > Files in bz2 format. You need to decompress the bz2 file to tar, and then unwrap the tar file to display a debug folder that contains other folders containing debug dbg text files. Customer support may request the bz2 file for troubleshooting. ![](images/cd0205aa6519dfb163cc6252a9f9c3ddf907f3fa0228deb8e4d7e17a38db8802.jpg)

45.2.2 The Diagnostics Controller Screen

Click Maintenance > Diagnostics > Controller to open the following screen. When you click Collect Now, a series of commands are run to display information about the Zyxel Device. Figure 639 Maintenance > Diagnostics > Controller ![](images/c24e9fe13fdd13834c788e0cef19620ea32045c145813e95d7ee883aa3f596f9.jpg) The following table describes the labels in this screen. Table 411 Maintenance > Diagnostics > Controller
LABEL DESCRIPTION
Diagnostics Collect Status
StatusThis field displays the following states the Zyxel Device is in when collecting diagnostic data.Standby: The Zyxel Device is ready to generate a diagnostic file or has just finished generating a diagnostic file.Busy on Ap: The Zyxel Device is generating a diagnostic file for the selected managed AP in Diagnostics >AP.Busy on ZyWall: The Zyxel Device is generating a diagnostic file containing its own configuration and diagnostic information.
General Setting
FilenameThis is the name of the most recently created diagnostic file.
Last modifiedThis is the date and time that the last diagnostic file was created. The format is yyyy-mm-dd hh:mm:ss.
SizeThis is the size of the most recently created diagnostic file.
Copy the diagnostic file to USB storage (if ready)Select this to have the Zyxel Device create an extra copy of the diagnostic file to a connected USB storage device.
Diagnostic Collect by Script files
Script FileSelect a script here to generate information about configuration and diagnostics of managed APs. See Section 45.2.1 on page 931 for more information on scripts.
Upload Shell Script
FileUpload a script here to generate information about the Zyxel Device's own configuration and diagnostics. ClickBrowseto find the location of the file you want to upload in this field. ClickUploadto begin the upload process. This process may take a few minutes.
Collect NowClick this to have the Zyxel Device run the uploaded script and create a new diagnostic file.Wait while information is collected.ZYXEL USGFLEX700-GB0101F - The Diagnostics Controller Screen - 1

45.2.3 The Diagnostics AP Screen

This screen provides an easy way for you to generate a file containing the selected managed AP's configuration and diagnostic information. You may need to generate this file and send it to customer support during troubleshooting. Click Maintenance > Diagnostics > Collect on AP to open the Collect on AP screen. Figure 640 Maintenance > Diagnostics > AP ![](images/8f35fac26d84e57761b3565f2b4b8e651295ac91df1e013ac7a897b6ab5e92b8.jpg) The following table describes the labels in this screen. Table 412 Maintenance > Diagnostics > AP
LABEL DESCRIPTION
Diagnostics Collect Status
StatusThis field displays the following states the Zyxel Device is in when collecting diagnostic data.Standby: The Zyxel Device is ready to generate a diagnostic file or has just finished generating a diagnostic file.Busy on Ap: The Zyxel Device is generating a diagnostic file for the selected managed AP in Diagnostics >AP.Busy on ZyWall: The Zyxel Device is generating a diagnostic file containing its own configuration and diagnostic information.
ProgressThis field displays the number of APs processed compared to the number of APs selected for processing.
Latest AP ResultThis field displays the latest AP description and status
AP General Setting
Available APsThis text box lists the managed APs that are connected and available. Select the managed APs that you want the Zyxel Device to generate a diagnostic file containing their configuration, and click the right arrow button to add them.
Collected APsThis text box lists the managed APs that you allow the Zyxel Device to generate a diagnostic file containing their configuration. Select any managed APs that you want to prevent the Zyxel Device from generating a diagnostic file for them, and click the left arrow button to remove them.
Copy the diagnostic file to USB storage (if ready)Select this to have the Zyxel Device create an extra copy of the diagnostic file to a connected USB storage device.
Table 412 Maintenance > Diagnostics > AP
LABEL DESCRIPTION
Diagnostic Collect by Script files
Script FileSelect a script here to generate information about configuration and diagnostics of managed APs. See Section 45.2.1 on page 931 for more information on scripts.
Upload Shell Script
File Upload a script hereto generate information about configuration and diagnostics of managed APs. Click Browse to find the location of the script you want to upload in this field. Click Upload to begin the upload process. This process may take a few minutes.
Collect NowClick this to have the Zyxel Device create a new diagnostic file.
ZYXEL USGFLEX700-GB0101F - The Diagnostics AP Screen - 1

45.2.4 The Diagnostics Files Screen

Click Maintenance > Diagnostics > Files to open the diagnostic files screen. This screen lists the files of diagnostic information the Zyxel Device has collected and stored on the Zyxel Device or in a connected USB storage device. You may need to send these files to customer support for troubleshooting. Figure 641 Maintenance > Diagnostics > Files ![](images/7f079882ff451734005531fc6ad93dfdfd6f724f2de224d3e42b99c3d82cb64e.jpg) The following table describes the labels in this screen. Table 413 Maintenance > Diagnostics > Files
LABEL DESCRIPTION
Diagnostic filesThis lists the files of generated diagnostic information stored on the Zyxel Device.
Diagnostic files in USB storageThis lists the files of generated diagnostic information stored in a connected USB storage device.
RemoveSelect files and click Remove to delete them from the Zyxel Device or the USB storage device. Use the [Shift] and/or [Ctrl] key to select multiple files. A pop-up window asks you to confirm that you want to delete.
DownloadClick a file to select it and click Download to save it to your computer.
#This column displays the number for each file entry. The total number of files that you can save depends on the file sizes and the available storage space.
File NameThis column displays the label that identifies the file.
Size This columndisplays the size (in bytes) of a file.
Last ModifiedThis column displays the date and time that the individual files were saved.

45.3 The Packet Capture Screen

Use this screen to capture network traffic going through the Zyxel Device's interfaces. Studying these packet captures may help you identify network problems. Click Maintenance > Diagnostics > Packet Capture to open the packet capture screen. Note: New capture files overwrite existing files of the same name. Change the File Suffix field's setting to avoid this. Figure 642 Maintenance > Diagnostics > Packet Capture ![](images/54397ceb7a5004696e8f2aa6ca9b351860d60a388b3079635435fb97cb1a475d.jpg) The following table describes the labels in this screen. Table 414 Maintenance > Diagnostics > Packet Capture
LABEL DESCRIPTION
InterfacesEnabled interfaces (except for virtual interfaces) appear under Available Interfaces. Select interfaces for which to capture packets and click the right arrow button to move them to the Capture Interfaces list. Use the [Shift] and/or [Ctrl] key to select multiple objects.
IP VersionSelect the version of IP for which to capture packets. Select any to capture packets for all IP versions.
Protocol TypeSelect the protocol of traffic for which to capture packets. Select any to capture packets for all types of traffic.
Host IPSelect a host IP address object for which to capture packets. Select any to capture packets for all hosts. Select User Defined to be able to enter an IP address.
Host PortThis field is configurable when you set the IP Type to any, tcp, or udp. Specify the port number of traffic to capture.
Continuously capture and overwrite old onesSelect this to have the Zyxel Device keep capturing traffic and overwriting old packet capture entries when the available storage space runs out.
Captured Packet FilesWhen saving packet captures only to the Zyxel Device's on board storage, specify a maximum limit in megabytes for the total combined size of all the capture files on the Zyxel Device.When saving packet captures to a connected USB storage device, specify a maximum limit in megabytes for each capture file.Note: If you have existing capture files and have not selected the Continuously capture and overwrite old ones option, you may need to set this size larger or delete existing capture files.The valid range depends on the available on board/USB storage size. The Zyxel Device stops the capture and generates the capture file when either the file reaches this size or the time period specified in the Duration field expires.
Split thresholdSpecify a maximum size limit in megabytes for individual packet capture files. After a packet capture file reaches this size, the Zyxel Device starts another packet capture file.
DurationSet a time limit in seconds for the capture. The Zyxel Device stops the capture and generates the capture file when either this period of time has passed or the file reaches the size specified in the File Size field. 0 means there is no time limit.
File SuffixSpecify text to add to the end of the file name (before the dot and filename extension) to help you identify the packet capture files. Modifying the file suffix also avoids making new capture files that overwrite existing files of the same name.The file name format is "interface name-file suffix.cap", for example "vlan2-packet-capture.cap".
Number Of Bytes To Capture (Per Packet)Specify the maximum number of bytes to capture per packet. The Zyxel Device automatically truncates packets that exceed this size. As a result, when you view the packet capture files in a packet analyzer, the actual size of the packets may be larger than the size of captured packets.
Save data to onboard storage onlySelect this to have the Zyxel Device only store packet capture entries on the Zyxel Device. The available storage size is displayed as well.Note: The Zyxel Device reserves some on board storage space as a buffer.
Save data to USB storageSelect this to have the Zyxel Device store packet capture entries only on a USB storage device connected to the Zyxel Device if the Zyxel Device allows this.Status:Unused - the connected USB storage device was manually unmounted by using the Remove Now button or for some reason the Zyxel Device cannot mount it none - no USB storage device is connected.service deactivated - USB storage feature is disabled (in Configuration > System > USB Storage), so the Zyxel Device cannot use a connected USB device to store system logs and other diagnostic information.available - you can have the Zyxel Device use the USB storage device. The available storage capacity also displays.Note: The Zyxel Device reserves some USB storage space as a buffer.
Save data to ftp server (available: xx MB)Select this to have the Zyxel Device store packet capture entries on the defined FTP site. The available storage size is displayed as well.
Server Address Type the IP address of the FTP server.
Server PortType the port this server uses for FTP traffic. The default FTP port is 21.
Name Type the login username to access the FTP server.
PasswordType the associated login password to access the FTP server.
CaptureClick this button to have the Zyxel Device capture packets according to the settings configured in this screen.You can configure the Zyxel Device while a packet capture is in progress although you cannot modify the packet capture settings.The Zyxel Device's throughput or performance may be affected while a packet capture is in progress.After the Zyxel Device finishes the capture it saves a separate capture file for each selected interface. The total number of packet capture files that you can save depends on the file sizes and the available flash storage space. Once the flash storage space is full, adding more packet captures will fail.
StopClick this button to stop a currently running packet capture and generate a separate capture file for each selected interface.
ResetClick this button to return the screen to its last-saved settings.

45.3.1 The Packet Capture on AP Screen

Use this screen to capture network traffic going through the connected APs' interfaces. Studying these packet captures may help you identify network problems. Click Maintenance > Diagnostics > Packet Capture > Capture on AP to open the packet capture screen. Note: New capture files overwrite existing files of the same name. Change the File Suffix field's setting to avoid this. Figure 643 Maintenance > Diagnostics > Packet Capture > Capture on AP ![](images/39c31608918b47ac25d51054b8f2ebf1630d50fad2998b02f283d4b7dc4f0fd0.jpg) The following table describes the labels in this screen. Table 415 Maintenance > Diagnostics > Packet Capture > Capture on AP
LABEL DESCRIPTION
Select on APThis lists the managed APs that are connected and available. Select the managed AP that you want the Zyxel Device to capture network traffic going through it.
QueryAfter you select an AP, click this button to update and display the interfaces, filter configuration and storage size available for the selected AP on the screen.Note: You need to use the Query button before packet capturing on an AP if the AP has rebooted or the applied AP profile settings have been changed.
Capture StatusThis shows Standby when the Zyxel Device is ready to or have finished capturing network traffic going through the selected AP's interface(s).This shows Preparing when the Zyxel Device is sending the capture command to the AP's interface(s).This shows Capturing when the AP is capturing network traffic going through the selected AP's interface(s).This shows File Receiving when the Zyxel Device starts to receive capture files from the AP's interface(s) after you press the Stop button.
InterfacesEnabled interfaces (except for virtual interfaces) appear under Available Interfaces. Select interfaces for which to capture packets and click the right arrow button to move them to the Capture Interfaces list. Use the [Shift] and/or [Ctrl] key to select multiple objects.
IP VersionSelect the version of IP for which to capture packets. Select any to capture packets for all IP versions.
Protocol TypeSelect the protocol of traffic for which to capture packets. Select any to capture packets for all types of traffic.
Host IPSelect a host IP address object for which to capture packets. Select any to capture packets for all hosts. Select User Defined to be able to enter an IP address.
Host PortThis field is configurable when you set the IP Type to any, tcp, or udp. Specify the port number of traffic to capture.
Continuously capture and overwrite old onesSelect this to have the Zyxel Device keep capturing traffic and overwriting old packet capture entries when the available storage space runs out.
Captured Packet FilesWhen saving packet captures only to the Zyxel Device's on board storage, specify a maximum limit in megabytes for the total combined size of all the capture files on the Zyxel Device.When saving packet captures to a connected USB storage device, specify a maximum limit in megabytes for each capture file.Note: If you have existing capture files and have not selected the Continuously capture and overwrite old ones option, you may need to set this size larger or delete existing capture files.The valid range depends on the available on board/USB storage size. The Zyxel Device stops the capture and generates the capture file when either the file reaches this size or the time period specified in the Duration field expires.
Split thresholdSpecify a maximum size limit in megabytes for individual packet capture files. After a packet capture file reaches this size, the Zyxel Device starts another packet capture file.
DurationSet a time limit in seconds for the capture. The Zyxel Device stops the capture and generates the capture file when either this period of time has passed or the file reaches the size specified in the File Size field. 0 means there is no time limit.
File SuffixSpecify text to add to the end of the file name (before the dot and filename extension) to help you identify the packet capture files. Modifying the file suffix also avoids making new capture files that overwrite existing files of the same name.The file name format is "interface name-file suffix.cap", for example "vlan2-packet-capture.cap".
Number Of Bytes To Capture (Per Packet)Specify the maximum number of bytes to capture per packet. The Zyxel Device automatically truncates packets that exceed this size. As a result, when you view the packet capture files in a packet analyzer, the actual size of the packets may be larger than the size of captured packets.
Save data to onboard storage onlySelect this to have the Zyxel Device only store packet capture entries on the Zyxel Device. The available storage size is displayed as well.Note: The Zyxel Device reserves some on board storage space as a buffer.
Save data to USB storageSelect this to have the Zyxel Device store packet capture entries only on a USB storage device connected to the Zyxel Device if the Zyxel Device allows this.Status:Unused- the connected USB storage device was manually unmounted by using the Remove Now button or for some reason the Zyxel Device cannot mount it. none- no USB storage device is connected.service deactivated- USB storage feature is disabled (inConfiguration > System > USB Storage), so the Zyxel Device cannot use a connected USB device to store system logs and other diagnostic information.available- you can have the Zyxel Device use the USB storage device. The available storage capacity also displays.Note: The Zyxel Device reserves some USB storage space as a buffer.
Save data to ftp server (available: xx MB)Select this to have the Zyxel Device store packet capture entries on the defined FTP site. The available storage size is displayed as well.
Server Address Type the IP address of the FTP server.
Server PortType the port this server uses for FTP traffic. The default FTP port is 21.
Name Type the login username to access the FTP server.
PasswordType the associated login password to access the FTP server.
CaptureClick this button to have the Zyxel Device capture packets according to the settings configured in this screen.You can configure the Zyxel Device while a packet capture is in progress although you cannot modify the packet capture settings.The Zyxel Device's throughput or performance may be affected while a packet capture is in progress.After the Zyxel Device finishes the capture it saves a separate capture file for each selected interface. The total number of packet capture files that you can save depends on the file sizes and the available flash storage space. Once the flash storage space is full, adding more packet captures will fail.
StopClick this button to stop a currently running packet capture and generate a separate capture file for each selected interface.
ResetClick this button to return the screen to its last-saved settings.

45.3.2 The Packet Capture Files Screen

Click Maintenance > Diagnostics > Packet Capture > Files to open the packet capture files screen. This screen lists the files of packet captures stored on the Zyxel Device or a connected USB storage device. You can download the files to your computer where you can study them using a packet analyzer (also known as a network or protocol analyzer) such as Wireshark. Figure 644 Maintenance > Diagnostics > Packet Capture > Files ![](images/cd7fc475ba465aacb19283ea8eb480a5a6afa3c981ad8cb70e22a0a8aa0f940a.jpg) The following table describes the labels in this screen. Table 416 Maintenance > Diagnostics > Packet Capture > Files
LABEL DESCRIPTION
RemoveSelect files and click Remove to delete them from the Zyxel Device or the connected USB storage device. Use the [Shift] and/or [Ctrl] key to select multiple files. A pop-up window asks you to confirm that you want to delete.
DownloadClick a file to select it and click Download to save it to your computer.
#This column displays the number for each packet capture file entry. The total number of packet capture files that you can save depends on the file sizes and the available flash storage space.
File NameThis column displays the label that identifies the file. The file name format is interface name-file suffix.cap.
SizeThis column displays the size (in bytes) of a configuration file.
Last ModifiedThis column displays the date and time that the individual files were saved.

45.4 The CPU / Memory Status Screen

Click Maintenance > Diagnostics > CPU / Memory Status to open the CPU/Memory Status screen. Use this screen to view the CPU and memory performance of various applications on the Zyxel Device. Figure 645 Maintenance > Diagnostics > CPU / Memory Status ![](images/35e88a56288af662116fedb987c15c6c22d6d6467bd19fd8cad275109cd2c3c8.jpg) The following table describes the labels in this screen. Table 417 Maintenance > Diagnostics > CPU / Memory Status
LABEL DESCRIPTION
CPU StatusThis table displays the applications that use the most Zyxel Device CPU processing.
CPUn UsageCPU usage shows how much processing power the Zyxel Device is using. This field displays the current percentage usage of a CPU (where n is the number of the CPU) as a percentage of total processing power.
Network TrafficThis field displays the current percentage of network traffic through the Zyxel Device.
#This field is a sequential value, and it is not associated with any entry.
CPUThis field displays the current CPU utilization percentage for each application used on the Zyxel Device.
ApplicationThis field displays the name of the application consuming the related processing power on the Zyxel Device.
MemoryThis field displays the current DRAM memory utilization percentage for each application used on the Zyxel Device.
TimeThis field displays each application's running time in hours - minutes - seconds.
Memory StatusThis table displays the applications that use the most Zyxel Device DRAM memory.
Memory UsageMemory usage shows how much DRAM memory the Zyxel Device is using. This field displays the current percentage of memory utilization.
#This field is a sequential value, and it is not associated with any entry.
Table 417 Maintenance > Diagnostics > CPU / Memory Status
LABEL DESCRIPTION
MemoryThis field displays the current DRAM memory utilization percentage for each application used on the Zyxel Device.
ApplicationThis field displays the name of the application consuming the related memory on the Zyxel Device.
CPUThis field displays the current CPU utilization percentage for each application used on the Zyxel Device.
Time This field displays each application's running time.
Refresh Click this to update the information in this screen.

45.5 The System Log Screen

Click Maintenance > Diagnostics > System Log to open the System Log screen. This screen lists the files of Zyxel Device system logs stored on a connected USB storage device. The files are in comma separated value (csv) format. You can download them to your computer and open them in a tool like Microsoft's Excel. Figure 646 Maintenance > Diagnostics > System Log ![](images/3c17c31a9ffcbdfb58bb648aac2433a082560909777a8d73087a50a85205a209.jpg) The following table describes the labels in this screen. Table 418 Maintenance > Diagnostics > System Log
LABEL DESCRIPTION
RemoveSelect files and click Remove to delete them from the Zyxel Device. Use the [Shift] and/or [Ctrl] key to select multiple files. A pop-up window asks you to confirm that you want to delete.
DownloadClick a file to select it and click Download to save it to your computer.
#This column displays the number for each file entry. The total number of files that you can save depends on the file sizes and the available storage space.
File NameThis column displays the label that identifies the file.
Size This column displays the size (in bytes) of a file.
Last ModifiedThis column displays the date and time that the individual files were saved.

45.6 The Network Tool Screen

Use this screen to perform various network tests. Click Maintenance > Diagnostics > Network Tool to display this screen. Figure 647 Maintenance > Diagnostics > Network Tool ![](images/d3619e2503f3f0924dfdee29fb312aef74720f255b6b505933efd191881e66af.jpg) Figure 648 Maintenance > Diagnostics > Network Tool - Test Email Server ![](images/3298fc1c2bd7ef077dcb1530570648505fffb8a07b8105e08caf8430129f92a4.jpg) The following table describes the labels in this screen. Table 419 Maintenance > Diagnostics > Network Tool
LABEL DESCRIPTION
Network Tool Select a network tool:Select NSLOOKUP IPv4 or NSLOOKUP IPv6 to perform name server lookup for querying the Domain Name System (DNS) to get the domain name or IP address mapping.Select PING IPv4 or PING IPv6 to ping the IP address that you entered.Select TRACEROUTE IPv4 or TRACEROUTE IPv6 to run the traceroute function. This determines the path a packet takes to the specified computer.Select Test Email Server to test access to an SMTP email server.
Domain Name or IP AddressType the IP address that you want to use to for the selected network tool.
AdvanceClick this to display the following fields.
Query ServerEnter the IP address of a server to which the Zyxel Device sends queries for NSLOOKUP.
InterfaceSelect the interface through which the Zyxel Device sends queries for PING or TRACEROUTE.
Extension OptionEnter the extended option if you want to use an extended ping or traceroute command. For example, enter "-c count" (where count is the number of ping requests) to set how many times the Zyxel Device pings the destination IP address, or enter "-w waittime" (where waittime is a time period in seconds) to set how long the Zyxel Device waits for a response to a probe before running another traceroute.
The following fields display when you select Test Email Server in Network Tool.
Mail ServerType the name or IP address of the outgoing SMTP server.
Mail Subject Type the subject line for the outgoing email.Select Append system name to add the Zyxel Device system name to the subject.Select Append date time to add the Zyxel Device date and time to the subject.
Mail Server PortEnter the same port number here as is on the mail server for mail traffic.
TLS SecuritySelect this option if the mail server uses Transport Layer Security (TLS) for encrypted communications between the mail server and the Zyxel Device.
STARTTLSSelect this option if the mail server uses SSL or TLS for encrypted communications between the mail server and the Zyxel Device.
Authenticate ServerSelect this if the Zyxel Device authenticates the mail server in the TLS handshake.
Mail FromType the email address from which the outgoing email is delivered. This address is used in replies.
Mail To Type the email address to which the outgoing email is delivered.
SMTP AuthenticationSelect this check box if it is necessary to provide a user name and password to the SMTP server.
User NameThis box is effective when you select the SMTP Authentication check box. Type the user name to provide to the SMTP server when the log is emailed.
PasswordThis box is effective when you select the SMTP Authentication check box. Type a password of up to 63 characters to provide to the SMTP server when the log is emailed.
Retype to ConfirmRetype your new password for confirmation.
TestClick this button to start the test.
StopClick this button to stop the test.
ResetClick this button to return the screen to its last-saved settings.

45.7 The Routing Traces Screen

Click Maintenance > Diagnostics > Routing Traces to display this screen. Use this screen to configure a traceroute to identify where packets are dropped for troubleshooting. Figure 649 Maintenance > Diagnostics > Routing Traces ![](images/b5460f9050139bf638a60ec0f6d281ca269f89d23e535942491da1b6282ef11a.jpg) The following table describes the labels in this screen. Table 420 Maintenance > Diagnostics > Routing Traces
LABEL DESCRIPTION
IP AddressYou can trace traffic through the Zyxel Device from a specific source-to-destination stream or just from/to a specific host (source or destination).
Source Enter the sourceIP address of traffic that you want to trace.
PortEnter the source port number of traffic that you want to trace.
Destination Enter the destinationdestination IP address of traffic that you want to trace.
Port Enter the destinationport number of traffic that you want to trace.
HostEnter the IP address of a specific source or destination host whose traffic you want to trace.
PortEnter the port number for particular source traffic on the host that you want to trace.
ProtocolSelect the protocol of traffic that you want to trace.anymeans any protocol.
IntervalEnter a time interval in seconds for renewing a route trace. The default time interval is 5 seconds.
CaptureClick this button to have the Zyxel Device capture frames according to the settings configured in this screen.You can configure the Zyxel Device while a frame capture is in progress although you cannot modify the frame capture settings.
Flush Data Click this to clearall data on the screen.
SessionThis field displays established sessions that passed through the Zyxel Device which matched the capture criteria.
IDThis field displays the packet ID for each active session.
ProtocolThis field displays the protocol used in each active session.
from VPN IDThis field displays the tagged VLAN ID in ingress packets coming into the Zyxel Device.
to VPN IDThis field displays the tagged VLAN ID in egress packets going out from the Zyxel Device.
Incoming InterfaceThis is the source interface of packets to which this active session applies.
MessageThis field displays traceroute information.

45.8 The Wireless Frame Capture Screen

Use this screen to capture wireless network traffic going through the AP interfaces connected to your Zyxel Device. Studying these frame captures may help you identify network problems. Click Maintenance > Diagnostics > Wireless Frame Capture to display this screen. Note: New capture files overwrite existing files of the same name. Change the File Prefix field's setting to avoid this. Figure 650 Maintenance > Diagnostics > Wireless Frame Capture > Capture ![](images/69403f643b617bbcd783e19523fd06e1d3e815a2c590a3bb3327910e7217b8ee.jpg) The following table describes the labels in this screen. Table 421 Maintenance > Diagnostics > Wireless Frame Capture > Capture
LABEL DESCRIPTION
MON Mode APs
Configure AP to MON ModeClick this to go theConfiguration > Wireless > AP Managementscreen, where you can set one or more APs to monitor mode.
Available MON Mode APsThis column displays which APs on your wireless network are currently configured for monitor mode.Use the arrow buttons to move APs off this list and onto theCaptured MON Mode APs list.
Capture MON Mode APsThis column displays the monitor-mode configured APs selected to for wireless frame capture.
Misc Setting
File SizeSpecify a maximum size limit in kilobytes for the total combined size of all the capture files on the Zyxel Device, including any existing capture files and any new capture files you generate.Note: If you have existing capture files you may need to set this size larger or delete existing capture files.The valid range is 1 to 50000. The Zyxel Device stops the capture and generates the capture file when either the file reaches this size.
File PrefixSpecify text to add to the front of the file name in order to help you identify frame capture files.You can modify the prefix to also create new frame capture files each time you perform a frame capture operation. Doing this does no overwrite existing frame capture files.The file format is: [file prefix].cap. For example, "monitor.cap".
CaptureClick this button to have the Zyxel Device capture frames according to the settings configured in this screen.You can configure the Zyxel Device while a frame capture is in progress although you cannot modify the frame capture settings.The Zyxel Device's throughput or performance may be affected while a frame capture is in progress.After the Zyxel Device finishes the capture it saves a combined capture file for all APs. The total number of frame capture files that you can save depends on the file sizes and the available flash storage space. Once the flash storage space is full, adding more frame captures will fail.
Stop Click this button to stop a currently running frame capture and generate a combined capture file for all APs.
ResetClick this button to return the screen to its last-saved settings.

45.8.1 The Wireless Frame Capture Files Screen

Click Maintenance > Diagnostics > Wireless Frame Capture > Files to open this screen. This screen lists the files of wireless frame captures the Zyxel Device has performed. You can download the files to your computer where you can study them using a packet analyzer (also known as a network or protocol analyzer) such as Wireshark. Figure 651 Maintenance > Diagnostics > Wireless Frame Capture > Files ![](images/f4bab5e6db66011402fb58d054741c5b481aaa9709c2d41c3fed94c4a8d1bdfc.jpg) The following table describes the labels in this screen. Table 422 Maintenance > Diagnostics > Wireless Frame Capture > Files
LABEL DESCRIPTION
RemoveSelect files and click Remove to delete them from the Zyxel Device. Use the [Shift] and/or [Ctrl] key to select multiple files. A pop-up window asks you to confirm that you want to delete.
DownloadClick a file to select it and click Download to save it to your computer.
#This column displays the number for each packet capture file entry. The total number of packet capture files that you can save depends on the file sizes and the available flash storage space.
File NameThis column displays the label that identifies the file. The file name format is interface name-file suffix.cap.
SizeThis column displays the size (in bytes) of a configuration file.
Last ModifiedThis column displays the date and time that the individual files were saved.

CHAPTER 46

Packet Flow Explore

46.1 Overview

Use this to get a clear picture on how the Zyxel Device determines where to forward a packet and how to change the source IP address of the packet according to your current settings. This function provides you a summary of all your routing and SNAT settings and helps troubleshoot any related problems.

46.1.1 What You Can Do in this Chapter

- Use the Routing Status screen (see Section 46.2 on page 952) to view the overall routing flow and each routing function's settings. - Use the SNAT Status screen (see Section 46.3 on page 956) to view the overall source IP address conversion (SNAT) flow and each SNAT function's settings.

46.2 Routing Status

The Routing Status screen allows you to view the current routing flow and quickly link to specific routing settings. Click a function box in the Routing Flow section, the related routes (activated) will display in the Routing Table section. To access this screen, click Maintenance > Packet Flow Explore > Routing Status. The order of the routing flow may vary depending on whether you: - Select use policy route to override direct route in the CONFIGURATION > Network > Routing > Policy Route screen. - Use policy routes to control 1-1 NAT by using the policy control-virtual-server-rules activate command. - Select use policy routes to control dynamic IPSec rules in the CONFIGURATION > VPN > IPSec VPN > VPN Connection screen. Note: Once a packet matches the criteria of a routing rule, the Zyxel Device takes the corresponding action and does not perform any further flow checking. Figure 652 Maintenance > Packet Flow Explore > Routing Status (Direct Route) ![](images/31f97b50665de7ae2e0e23ee50cc6f170eb8145c961ef889a86d79857933aef0.jpg)
flowchart
graph LR
    A["Direct Route"] --> B["Dynamic VTN"]
    B --> C["Policy Route"]
    C --> D["1-1 SNAT"]
    D --> E["Static Dynamic VTN"]
    E --> F["Static Dynamic Route"]
    F --> G["Default WAN Trunk"]
    G --> H["Main Route"]
    H --> I["Exit"]
Figure 653 Maintenance > Packet Flow Explore > Routing Status (Dynamic VPN) ![](images/09c78d4fc3089294376301a7f9beeba160e6b3c51eb6f2a67b6b469ddaf81860.jpg)
flowchart
graph LR
    A["Direct Route"] --> B["Dynamic VTN"]
    B --> C["Policy Route"]
    C --> D["1-1 SNAT"]
    D --> E["SiteToSite VTN"]
    E --> F["Static-Dynamic Route"]
    F --> G["Default WAN Trunk"]
    G --> H["Main Route"]
    H --> I["Out"]
Figure 654 Maintenance > Packet Flow Explore > Routing Status (Policy Route) ![](images/c67f39c5c5fd3bd62f1f5346126c44fd486665f51a04eec1b4276af7dd401483.jpg)
flowchart
graph LR
    A["Direct Route"] --> B["Dynamic VPN"]
    B --> C["Policy Route"]
    C --> D["1 - 1 SNAT"]
    D --> E["Skeletal VPN"]
    E --> F["Static Dynamic Route"]
    F --> G["Default WAN Bank"]
    G --> H["Main Route"]
    H --> I["Out"]
Figure 655 Maintenance > Packet Flow Explore > Routing Status (1-1 SNAT) ![](images/d2db59298d25f8452407c0f8c55dbbe7c052792b47a00bc31e5dacad1a7b2888.jpg)
flowchart
graph LR
    A["Direct Route"] --> B["Dynamic VPN"]
    B --> C["Policy Route"]
    C --> D["E-8 SNAT"]
    D --> E["SiteToSite VPN"]
    E --> F["Static-Dynamic Route"]
    F --> G["Default WAN Track"]
    G --> H["Main Route"]
    H --> I["Out"]
Figure 656 Maintenance > Packet Flow Explore > Routing Status (SiteToSite VPN) ![](images/2c73399c1a91c0f1070a399d8622103d43290cdc13a45fc16a9e6ca5360256ba.jpg)
flowchart
graph LR
    A["Direct Route"] --> B["Dynamic VPN"]
    B --> C["Policy Route"]
    C --> D["1-1 SNAT"]
    D --> E["Static-Dynamic VPN"]
    E --> F["Static-Dynamic Route"]
    F --> G["Default WAN Truck"]
    G --> H["Main Route"]
    H --> I["Out"]
Figure 657 Maintenance > Packet Flow Explore > Routing Status (Static-Dynamic Route) ![](images/57d84de424826441e3f1cf1326b97865517aa76b864eb0a60f16b17db59bf965.jpg)
flowchart
graph LR
    A["Direct Route"] --> B["Dynamic VPN"]
    B --> C["Policy Route"]
    C --> D["E-1 SNAT"]
    D --> E["StaticToile VPN"]
    E --> F["Static Dynamic Route"]
    F --> G["Default WAN Trunk"]
    G --> H["Main Route"]
    H --> I["Out"]
Figure 658 Maintenance > Packet Flow Explore > Routing Status (Default WAN Trunk) ![](images/73b0418f8628f8f3f51c434370dc612009950a20c50a834a924fa1d86eb7816b.jpg)
flowchart
graph LR
    A["Direct Route"] --> B["Dynamic VPN"]
    B --> C["Policy Route"]
    C --> D["1-1 SNAT"]
    D --> E["Static Site VPN"]
    E --> F["Static Dynamic Route"]
    F --> G["Default WAN Trunk"]
    G --> H["Main Route"]
    H --> I["Out"]
Figure 659 Maintenance > Packet Flow Explore > Routing Status (Main Route) ![](images/98aacb310ccfdda0541819e487660ba411ab7c725908c7e6308201f0ad7521e3.jpg)
flowchart
graph LR
    A["Direct Route"] --> B["Dynamic VTN"]
    B --> C["Policy Route"]
    C --> D["1.1 SNAT"]
    D --> E["Isible VTN"]
    E --> F["Static Dynamic Route"]
    F --> G["Default WAN Truck"]
    G --> H["Main Route"]
    H --> I["Out"]
The following table describes the labels in this screen. Table 423 Maintenance > Packet Flow Explore > Routing Status
LABEL DESCRIPTION
Routing FlowThis section shows you the flow of how the Zyxel Device determines where to route a packet. Click a function box to display the related settings in the Routing Table section.
Routing TableThis section shows the corresponding settings according to the function box you click in the Routing Flow section.
The following fields are available if you click Direct Route, Static-Dynamic Route, or Main Route in the Routing Flow section.
#This field is a sequential value, and it is not associated with any entry.
Destination This is the destination IP address of a route.
GatewayThis is the IP address of the next-hop gateway or the interface through which the traffic is routed.
InterfaceThis is the name of an interface associated with the route.
MetricThis is the route's priority among the displayed routes.
Flags This indicates additional information for the route. The possible flags are:• A - this route is currently activated.• S - this is a static route.• C - this is a direct connected route.• O - this is a dynamic route learned through OSPF.• R - this is a dynamic route learned through RIP.• B - this is a dynamic route learned through BGP.• G - the route is to a gateway (router) in the same network.• ! - this is a route which forces a route lookup to fail.• B - this is a route which discards packets.• L - this is a recursive route.
PersistThis is the remaining time of a dynamically learned route. The Zyxel Device removes the route after this time period is counted down to zero.
The following fields are available if you click Policy Route in the Routing Flow section.
#This field is a sequential value, and it is not associated with any entry.
Incoming This is the interface on which the packets are received.
SourceThis is the source IP address(es) from which the packets are sent.
DestinationThis is the destination IP address(es) to which the packets are transmitted.
ServiceThis is the name of the service object. any means all services.
Source PortThis is the source port(s) from which the packets are sent.
DSCP CodeThis is the DSCP value of incoming packets to which this policy route applies. See Section 10.2 on page 327 for more information.
Next Hop TypeThis is the type of the next hop to which packets are directed.
Next Hop Info• This is the main route if the next hop type is Auto.• This is the interface name and gateway IP address if the next hop type is Interface / GW.• This is the tunnel name if the next hop type is VPN Tunnel.• This is the trunk name if the next hop type is Trunk.
The following fields are available if you click 1-1 SNAT in the Routing Flow section.
#This field is a sequential value, and it is not associated with any entry.
NAT RuleThis is the name of an activated 1:1 or Many 1:1 NAT rule in the NAT table.
Source This is the external source IP address(es).
ProtocolThis is the transport layer protocol.
Source Port This is the source port number.
Destination This is the external destination IP address(es).
OutgoingThis is the outgoing interface that the SNAT rule uses to transmit packets.
GatewayThis is the IP address of the gateway in the same network of the outgoing interface.
The following fields are available if you click Dynamic VPN or SiteToSite VPN in the Routing Flow section.
#This field is a sequential value, and it is not associated with any entry.
Source This is the IP address(es) of the local VPN network.
Destination This is the IP address(es) for the remote VPN network.
VPN Tunnel This is the name of the VPN tunnel.
The following fields are available if you click Default WAN Trunk in the Routing Flow section.
#This field is a sequential value, and it is not associated with any entry.
SourceThis is the source IP address(es) from which the packets are sent.any means any IP address.
DestinationThis is the destination IP address(es) to which the packets are transmitted.any means any IP address.
TrunkThis is the name of the WAN trunk through which the matched packets are transmitted.

46.3 The SNAT Status Screen

The SNAT Status screen allows you to view and quickly link to specific source NAT (SNAT) settings. Click a function box in the SNAT Flow section, the related SNAT rules (activated) will display in the SNAT Table section. To access this screen, click Maintenance > Packet Flow Explore > SNAT Status. The order of the SNAT flow may vary depending on whether you: - select use default SNAT in the CONFIGURATION > Network > Interface > Trunk screen. - use policy routes to control 1-1 NAT by using the policy control-virtual-server-rules activate command. Note: Once a packet matches the criteria of an SNAT rule, the Zyxel Device takes the corresponding action and does not perform any further flow checking. Figure 660 Maintenance > Packet Flow Explore > SNAT Status (Policy Route SNAT) ![](images/dd1d684d9f505c87daf08233e4bb1c126a5dfe288915e5fc034b0c3f3f64ee68.jpg)
flowchart
graph LR
    A["Policy Route SNAT"] --> B["1.1 SNAT"]
    B --> C["Loopback SNAT"]
    C --> D["Default SNAT"]
    D --> E["Out"]
Figure 661 Maintenance > Packet Flow Explore > SNAT Status (1-1 SNAT) ![](images/326b16ed0f9872bc494371bb11fe8470938e801c29aa74b00ff2aa79c4acbf6f.jpg)
flowchart
graph LR
    A["Policy Route SNAT"] --> B["1-1 SNAT"]
    B --> C["Loopback SNAT"]
    C --> D["Double-decay SNAT"]
    D --> E["Out"]
Figure 662 Maintenance > Packet Flow Explore > SNAT Status (Loopback SNAT) ![](images/5a4b44e20a87f34930f1b60f132bdc0bfe86613a476d7bb172ab297b7b19ebd3.jpg)
flowchart
graph LR
    A["Policy Route SNAT"] --> B["1-1 SNAT"]
    B --> C["Loopback SNAT"]
    C --> D["Default SNAT"]
    D --> E["Out"]
Figure 663 Maintenance > Packet Flow Explore > SNAT Status (Default SNAT) ![](images/b4067d3664745d5b16d9d88666dd546ced1ae98dfe6d7ad519c3bd68104e0faa.jpg)
flowchart
graph LR
    A["Policy Route SNAT"] --> B["I-1 SNAT"]
    B --> C["Loopback SNAT"]
    C --> D["Default SNAT"]
    D --> E["Out"]
The following table describes the labels in this screen. Table 424 Maintenance > Packet Flow Explore > SNAT Status
LABEL DESCRIPTION
SNAT FlowThis section shows you the flow of how the Zyxel Device changes the source IP address for a packet according to the rules you have configured in the Zyxel Device. Click a function box to display the related settings in the SNAT Table section.
SNAT TableThe table fields in this section vary depending on the function box you select in the SNAT Flow section.
The following fields are available if you click Policy Route SNAT in the SNAT Flow section.
# This field is a seqential value, and it is not associated with any entry.
Outgoing This is the outgoing interface that the route uses to transmit packets.
SNATThis is the source IP address(es) that the SNAT rule uses finally.
The following fields are available if you click 1-1 SNAT in the SNAT Flow section.
# This field is a sequential value, and it is not associated with any entry.
NAT RuleThis is the name of an activated NAT rule which uses SNAT.
Source This is the external source IP address(es).
Protocol This is the transport layer protocol.
Source Port This is the source port number.
Destination This is the external destination IP address(es).
OutgoingThis is the outgoing interface that the SNAT rule uses to transmit packets.
SNATThis is the source IP address(es) that the SNAT rule uses finally.
The following fields are available if you click Loopback SNAT in the SNAT Flow section.
# This field is a sequential value, and it is not associated with any entry.
NAT RuleThis is the name of an activated NAT rule which uses SNAT and enables NAT loopback.
SourceThis is the original source IP address(es). any means any IP address.
DestinationThis is the original destination IP address(es). any means any IP address.
SNATThis indicates which source IP address the SNAT rule uses finally. For example, Outgoing Interface IP means that the Zyxel Device uses the IP address of the outgoing interface as the source IP address for the matched packets it sends out through this rule.
The following fields are available if you click Default SNAT in the SNAT Flow section.
# This field is a sequential value, and it is not associated with any entry.
IncomingThis indicates internal interface(s) on which the packets are received.
OutgoingThis indicates external interface(s) from which the packets are transmitted.
SNATThis indicates which source IP address the SNAT rule uses finally. For example, Outgoing Interface IP means that the Zyxel Device uses the IP address of the outgoing interface as the source IP address for the matched packets it sends out through this rule.

Chapter 47 Shutdown

47.1 Overview

Use this to shutdown the device in preparation for disconnecting the power. Always use the Maintenance > Shutdown > Shutdown screen or the "shutdown" command before you turn off the Zyxel Device or remove the power. Not doing so can cause the firmware to become corrupt.

47.1.1 What You Need To Know

Shutdown writes all cached data to the local storage and stops the system processes.

47.2 The Shutdown / Reboot Screen

To access this screen, click Maintenance > Shutdown/Reboot. Figure 664 Maintenance > Shutdown/ Reboot ![](images/3624fe587557287185e42c7f97076d317ca76a1b62a6702a1d2d1433c100d505.jpg) The following table describes the labels in this screen. Table 425 Maintenance > Shutdown / Reboot
LABEL DESCRIPTION
ShutdownClick the Shutdown button to shut down the Zyxel Device. Wait for the device to shut down before you manually turn off or remove the power. It does not turn off the power.
RebootClick Reboot to reboot the Zyxel Device immediately without turning the power off.
Schedule RebootSelect this check box to schedule a periodic reboot of the Zyxel Device.You should select a time when your network is not busy for minimal interruption.Note: You cannot enable Auto Update in File Manager > Firmware Management and Schedule Reboot in Maintenance > Shutdown-Reboot at the same time.
DailySet the Zyxel Device to reboot every day at the specified time. The time format is the 24 hour clock, so '0' means midnight for example.
WeeklySet the Zyxel Device to reboot once a week on the day and at the time specified.
MonthlySet the Zyxel Device to reboot once a month on the specified day, at the a specified hour and minute.If the date you select is greater than the number of days in a month, the Zyxel Device automatically reboots on the last day of the month. For example, if you select 31 and the month is February, the Zyxel Device reboots on day 28 or 29.
ApplyClick Apply to save your changes back to the Zyxel Device.
ResetClick Reset to return the screen to its last-saved settings.
You can also use the CLI command shutdown to close down the Zyxel Device.

PART III

Appendices and

Troubleshooting

CHAPTER 48

Troubleshooting

This chapter offers some suggestions to solve problems you might encounter. \- You can also refer to the logs (see Section 6.38 on page 190). \- For the order in which the Zyxel Device applies its features and checks, see Chapter 46 on page 952. None of the LEDs turn on. Make sure that you have the power cord connected to the Zyxel Device and plugged in to an appropriate power source. Make sure you have the Zyxel Device turned on. Check all cable connections. If the LEDs still do not turn on, you may have a hardware problem. In this case, you should contact your local vendor. Cannot access the Zyxel Device from the LAN. - Check the cable connection between the Zyxel Device and your computer or switch. - Ping the Zyxel Device from a LAN computer. Make sure your computer's Ethernet card is installed and functioning properly. Also make sure that its IP address is in the same subnet as the Zyxel Device's. - In the computer, click Start, (All) Programs, Accessories and then Command Prompt. In the Command Prompt window, type "ping" followed by the Zyxel Device's LAN IP address (192.168.1.1 is the default) and then press [ENTER]. The Zyxel Device should reply. - If you've forgotten the Zyxel Device's password, use the RESET button. Press the button in for about 5 seconds (or until the SYS LED starts to blink), then release it. It returns the Zyxel Device to the factory defaults (password is 1234, LAN IP address 192.168.1.1, etc). - If you've forgotten the Zyxel Device's IP address, you can use the commands through the CONSOLE port to check it. Connect your computer to the CONSOLE port using a console cable. Your computer should have a terminal emulation communications program (such as HyperTerminal) set to VT100 terminal emulation, no parity, 8 data bits, 1 stop bit, no flow control and 115200 bps port speed. I cannot access the Internet. - Check the Zyxel Device's connection to the Ethernet jack with Internet access. Make sure the Internet gateway device (such as a DSL modem) is working properly. - Check the WAN interface's status in the Dashboard. Use the installation setup wizard again and make sure that you enter the correct settings. Use the same case as provided by your ISP. I cannot update the anti-malware/IDP/application patrol/URL Threat filter/IP reputation signatures. - Make sure your Zyxel Device has the anti-malware/IDP/application patrol service registered and that the license is not expired. Purchase a new license if the license is expired. - Make sure your Zyxel Device is connected to the Internet. I cannot update the threat intelligence machine learning (TIML) signatures. - Make sure your Zyxel Device has the anti-malware service registered and that the gold security pack license is not expired. Purchase a new license if the license is expired. - Make sure your Zyxel Device is connected to the Internet. I downloaded updated anti-malware/IDP/application patrol/URL Threat filter/IP reputation signatures. Why has the Zyxel Device not re-booted yet? The Zyxel Device does not have to reboot when you upload new signatures. The content filter category service is not working. - Make sure your Zyxel Device has the content filter category service registered and that the license is not expired. Purchase a new license if the license is expired. - Make sure your Zyxel Device is connected to the Internet. - Make sure you select Enable Content Filter Category Service when you add a filter profile in the Configuration > Security Service > Content Filter > Profile > Add or Edit screen. I configured security settings but the Zyxel Device is not applying them for certain interfaces. Many security settings are usually applied to zones. Make sure you assign the interfaces to the appropriate zones. When you create an interface, there is no security applied on it until you assign it to a zone. The Zyxel Device is not applying the custom policy route I configured. The Zyxel Device checks the policy routes in the order that they are listed. So make sure that your custom policy route comes before any other routes that the traffic would also match. The Zyxel Device is not applying the custom security policy I configured. The Zyxel Device checks the security policies in the order that they are listed. So make sure that your custom security policy comes before any other rules that the traffic would also match. I cannot enter the interface name I want. The format of interface names other than the Ethernet interface names is very strict. Each name consists of 2-4 letters (interface type), followed by a number (x, limited by the maximum number of each type of interface). For example, VLAN interfaces are vlan0, vlan1, vlan2,...; and so on. \- The names of virtual interfaces are derived from the interfaces on which they are created. For example, virtual interfaces created on Ethernet interface wan1 are called wan1:1, wan1:2, and so on. Virtual interfaces created on VLAN interface vlan2 are called vlan2:1, vlan2:2, and so on. You cannot specify the number after the colon(:) in the Web Configurator; it is a sequential number. You can specify the number after the colon if you use the CLI to set up a virtual interface. I cannot set up a PPP interface, virtual Ethernet interface or virtual VLAN interface on an Ethernet interface. You cannot set up a PPP interface, virtual Ethernet interface or virtual VLAN interface if the underlying interface is a member of a bridge. You also cannot add an Ethernet interface or VLAN interface to a bridge if the member interface has a virtual interface or PPP interface on top of it. My rules and settings that apply to a particular interface no longer work. The interface's IP address may have changed. To avoid this, create an IP address object based on the interface. This way the Zyxel Device automatically updates every rule or setting that uses the object whenever the interface's IP address settings change. For example, if you change LAN1's IP address, the Zyxel Device automatically updates the corresponding interface-based, LAN1 subnet address object. I cannot set up a PPP interface. You have to set up an ISP account before you create a PPPoE or PPTP interface. The data rates through my cellular connection are no-where near the rates I expected. The actual cellular data rate you obtain varies depending on the cellular device you use, the signal strength to the service provider's base station, and so on.

I created a cellular interface but cannot connect through it.

- Make sure you have a compatible mobile broadband device installed or connected. See www.zyxel.com for details. - Make sure you have the cellular interface enabled. - Make sure the cellular interface has the correct user name, password, and PIN code configured with the correct casing. - If the Zyxel Device has multiple WAN interfaces, make sure their IP addresses are on different subnets.

Hackers have accessed my WEP-encrypted wireless LAN.

WEP is extremely insecure. Its encryption can be broken by an attacker, using widely-available software. It is strongly recommended that you use a more effective security mechanism. Use the strongest security mechanism that all the wireless devices in your network support. WPA2 or WPA2-PSK is recommended.

The wireless security is not following the re-authentication timer setting I specified.

If a RADIUS server authenticates wireless stations, the re-authentication timer on the RADIUS server has priority. Change the RADIUS server's configuration if you need to use a different re-authentication timer setting. I cannot configure a particular VLAN interface on top of an Ethernet interface even though I have it configured it on top of another Ethernet interface. Each VLAN interface is created on top of only one Ethernet interface. The Zyxel Device is not applying an interface's configured ingress bandwidth limit. At the time of writing, the Zyxel Device does not support ingress bandwidth management. The Zyxel Device is not applying my application patrol bandwidth management settings. Bandwidth management in policy routes has priority over application patrol bandwidth management. The Zyxel Device's performance slowed down after I configured many new application patrol entries. The Zyxel Device checks the ports and conditions configured in application patrol entries in the order they appear in the list. While this sequence does not affect the functionality, you might improve the performance of the Zyxel Device by putting more commonly used ports at the top of the list. The Zyxel Device's anti-malware scanner cleaned an infected file but now I cannot use the file. The scanning engine checks the contents of the packets for malware. If a malware pattern is matched, the Zyxel Device removes a portion of the file, while the rest goes through. Since the Zyxel Device erases a portion of the file before sending it, you may not be able to open the file. The Zyxel Device sent an alert that a malware-infected file has been found, but the file was still forwarded to the user and could still be executed. Make sure you enable Destroy Infected File in the Configuration > Security Service > Anti-Malware screen to modify infected files before forwarding the files to the user, preventing them from being executed. I added a file pattern in the anti-malware white list, but the Zyxel Device still checks and modifies files that match this pattern. Make sure you select the Check White List check box above the white list table. If it is already selected, make sure that the white list entry corresponding to this file pattern is activated. The Zyxel Device is not scanning some zipped files. The Zyxel Device cannot unzip password protected ZIP files or a ZIP file within another ZIP file. There are also limits to the number of ZIP files that the Zyxel Device can concurrently unzip. The Zyxel Device is deleting some zipped files. The anti-malware policy may be set to delete zipped files that the Zyxel Device cannot unzip. The Zyxel Device cannot unzip password protected ZIP files or a ZIP file within another ZIP file. There are also limits to the number of ZIP files that the Zyxel Device can concurrently unzip. The threat intelligence machine learning (TIML) feature is not working. 1 Make sure you purchase the gold security pack. - Make sure you've registered the Zyxel Device and activated the anti-malware service on portal.myZyxel.com. - Go to the screen, and select the Enable check box in the Configuration > Security Service > Anti-Malware to activate the TIML feature. 2 Make sure the gold security pack is not expired. If it is, renew the license. The Zyxel Device won't scan the TIML signatures that were downloaded when the gold security pack expired. The Zyxel Device's performance seems slower after configuring IDP. Depending on your network topology and traffic load, binding every packet direction to an IDP profile may affect the Zyxel Device's performance. You may want to focus IDP scanning on certain traffic directions such as incoming traffic. IDP is dropping traffic that matches a rule that says no action should be taken. The Zyxel Device checks all signatures and continues searching even after a match is found. If two or more rules have conflicting actions for the same packet, then the Zyxel Device applies the more restrictive action (reject-both, reject-receiver or reject-sender, drop, none in this order). If a packet matches a rule for reject-receiver and it also matches a rule for reject-sender, then the Zyxel Device will reject-both. I uploaded a custom signature file and now all of my earlier custom signatures are gone. The name of the complete custom signature file on the Zyxel Device is 'custom.rules'. If you import a file named 'custom.rules', then all custom signatures on the Zyxel Device are overwritten with the new file. If this is not your intention, make sure that the files you import are not named 'custom.rules'. I cannot configure some items in IDP that I can configure in Snort. Not all Snort functionality is supported in the Zyxel Device. The Zyxel Device's performance seems slower after configuring ADP. Depending on your network topology and traffic load, applying an anomaly profile to each and every packet direction may affect the Zyxel Device's performance. The Zyxel Device destroyed/dropped a file/email without notifying me. Make sure you enable logs for your security features, such as in the following screens: - Configuration > Security Service > IDP - Configuration > Security Service > Anti-Malware - Configuration > Security Service > Email Security The Zyxel Device routes and applies SNAT for traffic from some interfaces but not from others. The Zyxel Device automatically uses SNAT for traffic it routes from internal interfaces to external interfaces. For example LAN to WAN traffic. You must manually configure a policy route to add routing and SNAT settings for an interface with the Interface Type set to General. You can also configure a policy route to override the default routing and SNAT behavior for an interface with the Interface Type set to Internal or External. I cannot get Dynamic DNS to work. - You must have a public WAN IP address to use Dynamic DNS. - Make sure you recorded your DDNS account's user name, password, and domain name and have entered them properly in the Zyxel Device. - You may need to configure the DDNS entry's IP Address setting to Auto if the interface has a dynamic IP address or there are one or more NAT routers between the Zyxel Device and the DDNS server. - The Zyxel Device may not determine the proper IP address if there is an HTTP proxy server between the Zyxel Device and the DDNS server. I cannot create a second HTTP redirect rule for an incoming interface. You can configure up to one HTTP redirect rule for each (incoming) interface. I cannot get the application patrol to manage SIP traffic. Make sure you have the SIP ALG enabled. I cannot get the application patrol to manage H.323 traffic. Make sure you have the H.323 ALG enabled. I cannot get the application patrol to manage FTP traffic. Make sure you have the FTP ALG enabled. The Zyxel Device keeps resetting the connection. If an alternate gateway on the LAN has an IP address in the same subnet as the Zyxel Device's LAN IP address, return traffic may not go through the Zyxel Device. This is called an asymmetrical or "triangle" route. This causes the Zyxel Device to reset the connection, as the connection has not been acknowledged. You can set the Zyxel Device's security policy to permit the use of asymmetrical route topology on the network (so it does not reset the connection) although this is not recommended since allowing asymmetrical routes may let traffic from the WAN go directly to the LAN without passing through the Zyxel Device. A better solution is to use virtual interfaces to put the Zyxel Device and the backup gateway on separate subnets. See Asymmetrical Routes on page 566 and the chapter about interfaces for more information. I cannot set up an IPSec VPN tunnel to another device. If the IPSec tunnel does not build properly, the problem is likely a configuration error at one of the IPSec routers. Log into both Zyxel IPSec routers and check the settings in each field methodically and slowly. Make sure both the Zyxel Device and remote IPSec router have the same security settings for the VPN tunnel. It may help to display the settings for both routers side-by-side. Here are some general suggestions. See also Chapter 19 on page 418. - The system log can often help to identify a configuration problem. - If you enable NAT traversal, the remote IPSec device must also have NAT traversal enabled. - The Zyxel Device and remote IPSec router must use the same authentication method to establish the IKE SA. - Both routers must use the same negotiation mode. - Both routers must use the same encryption algorithm, authentication algorithm, and DH key group. - When using pre-shared keys, the Zyxel Device and the remote IPSec router must use the same pre-shared key. - The Zyxel Device's local and peer ID type and content must match the remote IPSec router's peer and local ID type and content, respectively. - The Zyxel Device and remote IPSec router must use the same active protocol. - The Zyxel Device and remote IPSec router must use the same encapsulation. - The Zyxel Device and remote IPSec router must use the same SPI. - If the sites are/were previously connected using a leased line or ISDN router, physically disconnect these devices from the network before testing your new VPN connection. The old route may have been learned by RIP and would take priority over the new VPN connection. - To test whether or not a tunnel is working, ping from a computer at one site to a computer at the other. Before doing so, ensure that both computers have Internet access (via the IPSec routers). - It is also helpful to have a way to look at the packets that are being sent and received by the Zyxel Device and remote IPSec router (for example, by using a packet sniffer). Check the configuration for the following Zyxel Device features. - The Zyxel Device does not put IPSec SAs in the routing table. You must create a policy route for each VPN tunnel. See Chapter 10 on page 325. - Make sure the To-Zyxel Device security policies allow IPSec VPN traffic to the Zyxel Device. IKE uses UDP port 500, AH uses IP protocol 51, and ESP uses IP protocol 50. - The Zyxel Device supports UDP port 500 and UDP port 4500 for NAT traversal. If you enable this, make sure the To-Zyxel Device security policies allow UDP port 4500 too. - Make sure regular security policies allow traffic between the VPN tunnel and the rest of the network. Regular security policies check packets the Zyxel Device sends before the Zyxel Device encrypts them and check packets the Zyxel Device receives after the Zyxel Device decrypts them. This depends on the zone to which you assign the VPN tunnel and the zone from which and to which traffic may be routed. - If you set up a VPN tunnel across the Internet, make sure your ISP supports AH or ESP (whichever you are using). - If you have the Zyxel Device and remote IPSec router use certificates to authenticate each other, You must set up the certificates for the Zyxel Device and remote IPSec router first and make sure they trust each other's certificates. If the Zyxel Device's certificate is self-signed, import it into the remote IPSec router. If it is signed by a CA, make sure the remote IPSec router trusts that CA. The Zyxel Device uses one of its Trusted Certificates to authenticate the remote IPSec router's certificate. The trusted certificate can be the remote IPSec router's self-signed certificate or that of a trusted CA that signed the remote IPSec router's certificate. - Multiple SAs connecting through a secure gateway must have the same negotiation mode. The VPN connection is up but VPN traffic cannot be transmitted through the VPN tunnel. If you have the Configuration > VPN > IPSec VPN > VPN Connection screen's Use Policy Route to control dynamic IPSec rules option enabled, check the routing policies to see if they are sending traffic elsewhere instead of through the VPN tunnels. I uploaded a logo to show in the SSL VPN user screens but it does not display properly. The logo graphic must be GIF, JPG, or PNG format. The graphic should use a resolution of 103 x 29 pixels to avoid distortion when displayed. The Zyxel Device automatically resizes a graphic of a different resolution to 103 x 29 pixels. The file size must be 100 kilobytes or less. Transparent background is recommended. I logged into the SSL VPN but cannot see some of the resource links. Available resource links vary depending on the SSL application object's configuration. I cannot download the Zyxel Device's firmware package. The Zyxel Device's firmware package cannot go through the Zyxel Device when you enable the anti-malware Destroy compressed files that could not be decompressed option. The Zyxel Device classifies the firmware package as not being able to be decompressed and deletes it. You can upload the firmware package to the Zyxel Device with the option enabled, so you only need to clear the Destroy compressed files that could not be decompressed option while you download the firmware package. See Section 33.2 on page 625 for more on the anti-malware Destroy compressed files that could not be decompressed option. I changed the LAN IP address and can no longer access the Internet. The Zyxel Device automatically updates address objects based on an interface's IP address, subnet, or gateway if the interface's IP address settings change. However, you need to manually edit any address objects for your LAN that are not based on the interface. I configured application patrol to allow and manage access to a specific service but access is blocked. \- If you want to use a service, make sure the security policy allows Security Service application patrol to go through the Zyxel Device. I configured policy routes to manage the bandwidth of TCP and UDP traffic but the bandwidth management is not being applied properly. It is recommended to use application patrol instead of policy routes to manage the bandwidth of TCP and UDP traffic. I cannot get the RADIUS server to authenticate the Zyxel Device's default admin account. The default admin account is always authenticated locally, regardless of the authentication method setting. The Zyxel Device fails to authentication the ext-user user accounts I configured. An external server such as AD, LDAP or RADIUS must authenticate the ext-user accounts. If the Zyxel Device tries to use the local database to authenticate an ext-user, the authentication attempt will always fail. (This is related to AAA servers and authentication methods, which are discussed in other chapters in this guide.) I cannot add the admin users to a user group with access users. You cannot put access users and admin users in the same user group. I cannot add the default admin account to a user group. You cannot put the default admin account into any user group. The schedule I configured is not being applied at the configured times. Make sure the Zyxel Device's current date and time are correct. I cannot get a certificate to import into the Zyxel Device. 1 For My Certificates, you can import a certificate that matches a corresponding certification request that was generated by the Zyxel Device. You can also import a certificate in PKCS#12 format, including the certificate's public and private keys. 2 You must remove any spaces from the certificate's filename before you can import the certificate. 3 Any certificate that you want to import has to be in one of these file formats: \- Binary X.509: This is an ITU-T recommendation that defines the formats for X.509 certificates. \- PEM (Base-64) encoded X.509: This Privacy Enhanced Mail format uses lowercase letters, uppercase letters and numerals to convert a binary X.509 certificate into a printable form. - Binary PKCS#7: This is a standard that defines the general syntax for data (including digital signatures) that may be encrypted. A PKCS #7 file is used to transfer a public key certificate. The private key is not included. The Zyxel Device currently allows the importation of a PKS#7 file that contains a single certificate. - PEM (Base-64) encoded PKCS#7: This Privacy Enhanced Mail (PEM) format uses lowercase letters, uppercase letters and numerals to convert a binary PKCS#7 certificate into a printable form. - Binary PKCS#12: This is a format for transferring public key and private key certificates. The private key in a PKCS #12 file is within a password-encrypted envelope. The file's password is not connected to your certificate's public or private passwords. Exporting a PKCS #12 file creates this and you must provide it to decrypt the contents when you import the file into the Zyxel Device. Note: Be careful not to convert a binary file to text during the transfer process. It is easy for this to occur since many programs use text files by default. I cannot access the Zyxel Device from a computer connected to the Internet. Check the service control rules and to-Zyxel Device security policies. I uploaded a logo to display on the upper left corner of the Web Configurator login screen and access page but it does not display properly. Make sure the logo file is a GIF, JPG, or PNG of 100 kilobytes or less. I uploaded a logo to use as the screen or window background but it does not display properly. Make sure the logo file is a GIF, JPG, or PNG of 100 kilobytes or less. The Zyxel Device's traffic throughput rate decreased after I started collecting traffic statistics. Data collection may decrease the Zyxel Device's traffic throughput rate. I can only see newer logs. Older logs are missing. When a log reaches the maximum number of log messages, new log messages automatically overwrite existing log messages, starting with the oldest existing log message first. The commands in my configuration file or shell script are not working properly. - In a configuration file or shell script, use “#” or “!” as the first character of a command line to have the Zyxel Device treat the line as a comment. - Your configuration files or shell scripts can use "exit" or a command line consisting of a single "!" to have the Zyxel Device exit sub command mode. - Include write commands in your scripts. Otherwise the changes will be lost when the Zyxel Device restarts. You could use multiple write commands in a long script. Note: "exit" or "!" must follow sub commands if it is to make the Zyxel Device exit sub command mode. See Chapter 44 on page 915 for more on configuration files and shell scripts. I cannot get the firmware uploaded using the commands. The Web Configurator is the recommended method for uploading firmware. You only need to use the command line interface if you need to recover the firmware. See the CLI Reference Guide for how to determine if you need to recover the firmware and how to recover it. My packet capture captured less than I wanted or failed. The packet capture screen's File Size sets a maximum size limit for the total combined size of all the capture files on the Zyxel Device, including any existing capture files and any new capture files you generate. If you have existing capture files you may need to set this size larger or delete existing capture files. The Zyxel Device stops the capture and generates the capture file when either the capture files reach the File Size or the time period specified in the Duration field expires. My earlier packet capture files are missing. New capture files overwrite existing files of the same name. Change the File Suffix field's setting to avoid this. IP reputation doesn't work on IPv6 addresses. At the time of writing, IP reputation is only for IPv4 addresses. See Chapter 34 Reputation Filter for more information. The SecuReporter banner keeps showing up. See SecuReporter Banner on page 838 for more information.

48.1 Resetting the Zyxel Device

If you cannot access the Zyxel Device by any method, try restarting it by turning the power off and then on again. If you still cannot access the Zyxel Device by any method or you forget the administrator password(s), you can reset the Zyxel Device to its factory-default settings. Any configuration files or shell scripts that you saved on the Zyxel Device should still be available afterwards. Use the following procedure to reset the Zyxel Device to its factory-default settings. This overwrites the settings in the startup-config.conf file with the settings in the system-default.conf file. Note: This procedure removes the current configuration. 1 Make sure the SYS LED is on and not blinking. 2 Press the RESET button and hold it until the SYS LED begins to blink. (This usually takes about five seconds.) 3 Release the RESET button, and wait for the Zyxel Device to restart. You should be able to access the Zyxel Device using the default settings.

48.2 Getting More Troubleshooting Help

Search for support information for your model at www.zyxel.com for more troubleshooting suggestions.

APPENDIX A

Customer Support

In the event of problems that cannot be solved by using this manual, you should contact your vendor. If you cannot contact your vendor, then contact a Zyxel office for the region in which you bought the device. See http://www.zyxel.com/homepage.shtml and also http://www.zyxel.com/about\_zyxel/zyxel\_worldwide.shtml for the latest information. Please have the following information ready when you contact an office.

Required Information

- Product model and serial number. - Warranty Information. - Date that you received your device. - Brief description of the problem and the steps you took to solve it.

Corporate Headquarters (Worldwide)

Taiwan

• Zyxel Communications Corporation - http://www.zyxel.com

Asia

China

• Zyxel Communications (Shanghai) Corp. Zyxel Communications (Beijing) Corp. Zyxel Communications (Tianjin) Corp. - http://www.zyxel.cn

India

• Zyxel Technology India Pvt Ltd - http://www.zyxel.in

Kazakhstan

• Zyxel Kazakhstan - http://www.zyxel.kz

Korea

• Zyxel Korea Corp. - http://www.zyxel.kr

Malaysia

• Zyxel Malaysia Sdn Bhd. - http://www.zyxel.com.my

Pakistan

• Zyxel Pakistan (Pvt.) Ltd. - http://www.zyxel.com.pk

Philippines

• Zyxel Philippines - http://www.zyxel.com.ph

Singapore

• Zyxel Singapore Pte Ltd. - http://www.zyxel.com.sg

Taiwan

• Zyxel Communications Corporation - https://www.zyxel.com/tw/zh/

Thailand

• Zyxel Thailand Co., Ltd - http://www.zyxel.co.th

Vietnam

• Zyxel Communications Corporation-Vietnam Office - http://www.zyxel.com/vn/vi

Europe

Austria

• Zyxel Deutschland GmbH - http://www.zyxel.de

Belarus

- Z y x e l B Y - http://www.zyxel.by

Belgium

• Zyxel Communications B.V. - http://www.zyxel.com/be/nl/ - http://www.zyxel.com/be/fr/

Bulgaria

• Z y x e l България - http://www.zyxel.com/bg/bg/

Czech Republic

• Zyxel Communications Czech s.r.o - http://www.zyxel.cz

Denmark

• Zyxel Communications A/S - http://www.zyxel.dk

Estonia

- Zyxel Estonia - http://www.zyxel.com/ee/et/

Finland

• Zyxel Communications - http://www.zyxel.fi

France

• Zyxel France - http://www.zyxel.fr

Germany

• Zyxel Deutschland GmbH - http://www.zyxel.de

Hungary

• Zyxel Hungary & SEE - http://www.zyxel.hu

Italy

• Zyxel Communications Italy - http://www.zyxel.it/

Latvia

• Z y x e l L a t v i a - http://www.zyxel.com/lv/lv/homepage.shtml

Lithuania

• Zyxel Lithuaniaia - http://www.zyxel.com/lt/lt/homepage.shtml

Netherlands

- Zyxel Benelux - http://www.zyxel.nl

Norway

• Zyxel Communications - http://www.zyxel.no

Poland

• Zyxel Communications Poland - http://www.zyxel.pl

Romania

• Zyxel Romania - http://www.zyxel.com/ro/ro

Russia

• Zyxel Russia - http://www.zyxel.ru

Slovakia

• Zyxel Communications Czech s.r.o. organizacna zlozka - http://www.zyxel.sk

Spain

• Zyxel Communications ES Ltd - http://www.zyxel.es

Sweden

• Zyxel Communications - http://www.zyxel.se

Switzerland

• Studerus AG \- http://www.zyxel.ch/

Turkey

• Zyxel Turkey A.S. - http://www.zyxel.com.tr

UK

• Zyxel Communications UK Ltd. - http://www.zyxel.co.uk

Ukraine

• Zyxel Ukraine - http://www.ua.zyxel.com

Latin America

Argentina

• Zyxel Communication Corporation - http://www.zyxel.com/ec/es/

Brazil

• Zyxel Communications Brasil Ltda. - https://www.zyxel.com/br/pt/

Ecuador

• Zyxel Communication Corporation - http://www.zyxel.com/ec/es/

Middle East

Israel

• Zyxel Communication Corporation - http://il.zyxel.com/homepage.shtml

Middle East

• Zyxel Communication Corporation - http://www.zyxel.com/me/en/

North America

USA

• Zyxel Communications, Inc. - North America Headquarters - http://www.zyxel.com/us/en/

Oceania

Australia

• Zyxel Communications Corporation - http://www.zyxel.com/au/en/

Africa

South Africa

• Nology (Pty) Ltd. - http://www.zyxel.co.za

APPENDIX B

Product Features

Please refer to the product datasheet for the latest product features.
VERSION 4.60 4.60 4.60 4.60 4.60
MODEL NAMEUSG FLEX 100USG FLEX 100WUSG FLEX 200USG FLEX 500USG FLEX 700
# of MAC 6 6 7 7 14
Interface
VLAN881664128
Virtual (Alias)4 per interface4 per interface4 per interface4 per interface4 per interface
PPP (System Default)3 3 3 8 14
PPP (User Created)2241632
Bridge2281616
Tunnel (GRE/IPv6 Transition)4 4 4 4 4
Routing
Static Route6464128256512
Policy Route1001005005001000
Reserved Sessions For Managed Devices500500500500500
Maximum OSPF Areas1010101010
Maximum BGP Neighbor5 5 5 5 5
BGP Maximum Network1616161616
Sessions
Maximum TCP Concurrent Sessions (Forwarding, NAT/ Firewall)300,000300,000600,0001,000,0001,600,000
Session Rate8,0008,00012,00020,00030,000
NAT
Maximum Virtual Server Number12812825610241024
Maximum Trigger Port Rule Number8 per PR rule8 per PR rule8 per PR rule8 per PR rule8 per PR rule
Maximum Redirect Service2020202020
Maximum Virtual Server Load Balancer Rule Number55102020
Maximum Real Server Number per Rule4 4 4 4 4
Firewall (Secure Policy)
Maximum Firewall ACL Rule Number = Secure Policy Number50050050020005000
Maximum Session Limit per Host Rules10001000100010001000
ADP
Maximum ADP Profile Number88323232
Maximum ADP Rule Number3232323232
User Profile
Maximum Local User6464128128512
Maximum Admin User5 5 5 5 10
Maximum User Group16163232128
Maximum User In One User Group6464128128512
Default Concurrent Device Login6464200200500
Maximum Concurrent Device Upgrade (License)6464200300 (Extend by license)800 (Extend by license)
HTTPd
Max HTTPd Number128128256512512
Objects
Address Object30030030010002000
Address Group505050200400
Maximum Address Object In One Group128128128128256
Service Object20020050010001000
Service Group5050100200200
Maximum Service Object In One Group6464128128256
VERSION4.604.604.604.604.60
MODEL NAMEUSG FLEX 100USG FLEX 100WUSG FLEX 200USG FLEX 500USG FLEX 700
Schedule Object 32 32 32 32 32
Schedule Group 16 16 16 16 16
Maximum Schedule Object In One Group 24 24 24 24 24
Application Object 500 500 500 1000 1000
Application Group 100 100 100 200 200
Maximum Application Object In One Group 128 128 128 12828 256
ISP Account16 (PPP+3G)16 (PPP+3G)16 (PPP+3G)32 (PPP+3G)32
Maximum LDAP Server Object #2281616
Maximum RADIUS Server Object #2281616
Maximum Ad Server Object #4481616
Maximum Zone Number (System Default)88898
Maximum Zone Number [User Defined]88161632
Trunk
Maximum Trunk Number (System Default)11111
Maximum Trunk Number [User Defined]4481632
Maximum Member Number Per Trunk4+84+84+816+832+8
VPN
Maximum VTI / VPN Tunnels Number5050100300500
Maximum VPN Concentrator Number2221616
Maximum VPN Contiguration Provision Rule Number5050100300500
SSL VPN
Default SSL VPN Connections303060150150
Maximum SSL VPN Connections303060150150
Maximum SSL VPN Network List88888
SSL VPN Max Policy32 32 32 64 128
Certificate
Certificate Buffer Size128k128k256k512k512k
Built-In Service
A Record64 64 64 128 128
NS Record (DNS Domain Zone Forward)88161616
MX Record8881616
Maximum Service Control Entries16 per service16 per service16 per service32 per service32 per service
Maximum DHCP Network Pool (VLAN + brg + Ethernet)15152988158
Maximum DHCP Host Pool (Static DHCP)96962565121024
Maximum DHCP Extended Options1010153030
Maximum DDNS Profiles10 10 10 10 10
DHCP Relay2 per interface2 per interface2 per interface2 per interface2 per interface
USB Storage
Device Number11111
Centralized Log
Log Entries512 512 1024 10242048
Debug Log Entries10241024102410241024
Admin Email Address22222
Syslog Server44444
Application Patrol
Maximum App Patrol Number3232326496
Maximum Application Object In Each Profile (Object + Object Group)32 32 32 64 96
IDP
Maximum IDP Profile Number8881616
Maximum Custom Signatures323232256512
SSL Inspection
Maximum SSL Inspection Profile6681616
Maximum Exclude List128128256256256
Content Filtering
Maximum Number Of Content Filter Policies1616163264
Forbidden Domain Entry Number256 per profiles256 per profiles256 per profiles512 per profiles512 per profiles
Trusted Domain Entry Number256 per profiles256 per profiles256 per profiles512 per profiles512 per profiles
Keyword Blocking Number128 per profiles128 per profiles128 per profiles256 per profiles256 per profiles
Common Forbidden Domain Entry Number 1024 1024 10241024 1024
Common Trusted Domain Entry Number 1024 1024 1024 10241024 1024
URL Threat Filter
Maximum Statistics Number 1024 1024 1024 1024
Maximum White List Rule 1024 1024 1024 1024
Maximum Black List Rule 1024 1024 1024 1024
IP Reputation
Maximum Statistics Number N/A N/A N/A N/A N/A
Maximum White List Rule N/A N/A N/A N/A N/A
Maximum Black List Rule N/A N/A N/A N/A N/A
Email Security
Maximum AS Rule Number (Profile)1616163232
Maximum White List Rule Support128128128128256
Maximum Black List Rule Support128128128128256
Maximum DNSBL Domain Support555510
Concurrent Mail Session Scanning200200200200200
Maximum Statistics Number500500500500500
Maximum Statistics Ranking1010101010
Anti-Malware
Maximum AV Rule (Profile)1616161632
Maximum Statistics Number500500500500500
Maximum Statistics Ranking1010101010
SandBoxing
Support ProtocolN/A N/A N/A N/AN/A
Concurrent File Collect CapabilityN/AN/AN/AN/AN/A
upload File SizeN/A N/A N/A N/AN/A
AP Controller
Default # of Control AP88888
Maximum # of Control AP24244072264
AP Group88888
Maximum Radio Profile32323264128
Maximum SSID Profile12812812810241024
Maximum Security Profile12812812810241024
Maximum MAC Filler Profile3232323232
Maximum MAC Entry Per MAC Filter Profile512512512512512
Zymesh3232323232
BWM
Maximum BWM Rule Number1281282565121024
BWM Per Source IP (Maximum)256256102410242048
SIP
Maximum SIP Concurrent Call5050100100200
Custom Web Portal Page
Maximum Internal Web Portal Customize File44444
Upload Zip File SizeUp to 2 MBUp to 2 MBUp to 2 MBUp to 2 MBUp to 2 MB
Unzip File SizeUp to 5 MBUp to 5 MBUp to 5 MBUp to 5 MBUp to 5 MB
Hotspot Management
Max Dynamic Account ListN/AN/A100020004000
Max Free Time Account LimitN/AN/A80016003200
Hotspot SupportN/AN/AYesYesYes
Walled Garden - URL BaseN/AN/A505050
Walled Garden - Domain/IP BaseN/AN/A505050
AdvertisementN/AN/A202020
Ticket Printer SupportN/A N/ASP350E(Ethernet)Up to 10SP350E(Ethernet)Up to 10SP350E(Ethernet)Up to 10

APPENDIX C

Copyright © 2020 by Zyxel Communications Corporation. The contents of this publication may not be reproduced in any part or as a whole, transcribed, stored in a retrieval system, translated into any language, or transmitted in any form or by any means, electronic, mechanical, magnetic, optical, chemical, photocopying, manual, or otherwise, without the prior written permission of Zyxel Communications Corporation. Published by Zyxel Communications Corporation. All rights reserved.

Disclaimer

Zyxel does not assume any liability arising out of the application or use of any products, or software described herein. Neither does it convey any license under its patent rights nor the patent rights of others. Zyxel further reserves the right to make changes in any products described herein without notice. This publication is subject to change without notice.

Regulatory Notice and Statement (Class B)

Model List: USG FLEX 100, USG FLEX 100W, USG FLEX 200

UNITED STATES of AMERICA

![](images/49d33adace986a10d7358c187759818c2ffe9e8800909e6b5d50b0764a125659.jpg) The following information applies if you use the product within USA area. US Importer: Zyxel Communications, Inc, 1130 North Miller Street Anaheim, CA92806-2001, https://www.zyxel.com/us/en/

FCC EMC Statement

• The device complies with Part 15 of FCC rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) This device must accept any interference received, including interference that may cause undesired operation. - Changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate the device. - This product has been tested and complies with the specifications for a Class B digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This device generates, uses, and can radiate radio frequency energy and, if not installed and used according to the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. - If this device does cause harmful interference to radio or television reception, which is found by turning the device off and on, the user is encouraged to try to correct the interference by one or more of the following measures: • Reorient or relocate the receiving antenna - Increase the separation between the devices - Connect the equipment to an outlet other than the receiver's - Consult a dealer or an experienced radio/TV technician for assistance

FCC Radiation Exposure Statement

• This device complies with FCC RF radiation exposure limits set forth for an uncontrolled environment. - This transmitter must be at least 22 cm from the user and must not be co-located or operating in conjunction with any other antenna or transmitter. - Operation of this device is restricted to indoor use only, except for relevant user's manual mention that this device can be installed into the external environment.

CANADA

The following information applies if you use the product within Canada area Innovation, Science and Economic Development Canada ICES Statement CAN ICES-3 (B)/NMB-3(B)

Innovation, Science and Economic Development Canada RSS-GEN & RSS-247 Statement

- This device contains licence-exempt transmitter(s)/receiver(s) that comply with Innovation, Science and Economic Development Canada's licence-exempt RSS(s). Operation is subject to the following two conditions: (1) this device may not cause interference, and (2) this device must accept any interference, including interference that may cause undesired operation of the device. - This radio transmitter (2468C-ATP100W) has been approved by Innovation, Science and Economic Development Canada to operate with the antenna types listed below with the maximum permissible gain indicated. Antenna types not included in this list that have, a gain greater than the maximum gain indicated for any type listed, are strictly prohibited for use with this device. Antenna Information
TypeManufacturerGainConnectorImpedance
Dipole (2412 – 2462MHz)Master Wave2.7Reverse SMA50 Ω
Dipole (5180 – 5240MHz)Master Wave3.86Reverse SMA50 Ω
Dipole (5745 – 5825MHz)Master Wave4.17Reverse SMA50 Ω
If the product with 5G wireless function operating in 5150 – 5250 MHz and 5725 – 5850 MHz, the following attention must be paid, - The device for operation in the band 5150 – 5250 MHz is only for indoor use to reduce the potential for harmful interference to co-channel mobile satellite systems. - For devices with detachable antenna(s), the maximum antenna gain permitted for devices in the band 5725 – 5850 MHz shall be such that the equipment still complies with the e.i.r.p. limits as appropriate; and - Where applicable, antenna type(s), antenna models(s), and the worst-case tilt angle(s) necessary to remain compliant with the e.i.r.p. elevation mask requirement set forth in Section 6.2.2.3 of RSS 247 shall be clearly indicated. If the product with 5G wireless function operating in 5250 – 5350 MHz and 5470 – 5725 MHz, the following attention must be paid. \- For devices with detachable antenna(s), the maximum antenna gain permitted for devices in the bands 5250 – 5350 MHz and 5470 – 5725 MHz shall be such that the equipment still complies with the e.i.r.p. limit. \- L'émetteur/récepteur exempt de licence contenu dans le présent appareil est conforme aux CNR d'innovation, Sciences et Développement économique Canada applicables aux appareils radio exempts de licence. L'exploitation est autorisée aux deux conditions suivantes : (1) l'appareil ne doit pas produire de brouillage; (2) L'appareil doit accepter tout brouillage radioélectrique subi, même si le brouillage est susceptible d'en compromettre le fonctionnement. \- Le présent émetteur radio (2468C-ATP100W) a été approuvé par Innovation, Sciences et Développement économique Canada pour fonctionner avec les types d'antenne énumérés ci dessous et ayant un gain admissible maximal. Les types d'antenne non inclus dans cette liste, et dont le gain est supérieur au gain maximal indiqué pour tout type figurant sur la liste, sont strictement interdits pour l'exploitation de l'émetteur. informations antenne
TypefabricantGainConnecteurImpédance
Dipole (2412 – 2462MHz)Master Wave2.7Reverse SMA50 Ω
Dipole (5180 – 5240MHz)Master Wave3.86Reverse SMA50 Ω
Dipole (5745 – 5825MHz)Master Wave4.17Reverse SMA50 Ω
Lorsque la fonction sans fil 5G fonctionnant en 5150 – 5250 MHz and 5725 – 5850 MHz est activée pour ce produit, il est nécessaire de porter une attention particulière aux choses suivantes - Les dispositifs fonctionnant dans la bande de 5 150 à 5 250 MHz sont réservés uniquement pour une utilisation à l'intérieur afin de réduire les risques de brouillage préjudiciable aux systèmes de satellites mobiles utilisant les mêmes canaux; - Pour les dispositifs munis d'antennes amovibles, le gain maximal d'antenne permis (pour les dispositifs utilisant la bande de 5 725 à 5 850 MHz) doit être conforme à la limite de la p.i.r.e. spécifiée, selon le cas; - Lorsqu'il y a lieu, les types d'antennes (s'il y en a plusieurs), les numéros de modèle de l'antenne et les pires angles d'inclinaison nécessaires pour rester conforme à l'exigence de la p.i.r.e. applicable au masque d'élévation, énoncée à la section 6.2.2.3 du CNR-247, doivent être clairement indiqués. Lorsque la fonction sans fil 5G fonctionnant en 5250 – 5350 MHz et 5470 – 5725 MHz est activée pour ce produit, il est nécessaire de porter une attention particulière aux choses suivantes. \- Pour les dispositifs munis d'antennes amovibles, le gain maximal d'antenne permis pour les dispositifs utilisant les bandes de 5 250 à 5 350 MHz et de 5 470 à 5 725 MHz doit être conforme à la limite de la p.i.r.e.

Industry Canada radiation exposure statement

This equipment complies with ISED radiation exposure limits set forth for an uncontrolled environment. This equipment should be installed and operated with a minimum distance of 25 cm between the radiator and your body.

Déclaration d'exposition aux radiations:

Cet équipement est conforme aux limites d'exposition aux rayonnements ISED établies pour un environnement non contrôlé. Cet équipement doit être installé et utilisé avec un minimum de 25 cm de distance entre la source de rayonnement et votre corps.

EUROPEAN UNION

![](images/fb04b6cc1d94ae3bdd7a9ddc83f9e0196830461c3c4992f510ddb371e31ff241.jpg) The following information applies if you use the product within the European Union.

Declaration of Conformity with Regard to EU Directive 2014/53/EU (Radio Equipment Directive, RED)

Model List: USG FLEX 100W

- Compliance information for 2.4 GHz and/or 5 GHz wireless products relevant to the EU and other Countries following the EU Directive 2014/53/EU (RED). And this product may be used in all EU countries (and other countries following the EU Directive 2014/53/EU) without any limitation except for the countries mentioned below table: - In the majority of the EU and other European countries, the 5 GHz bands have been made available for the use of wireless local area networks (LANs). Later in this document you will find an overview of countries in which additional restrictions or requirements or both are applicable. The requirements for any country may evolve. Zyxel recommends that you check with the local authorities for the latest status of their national regulations for the 5 GHz wireless LANs. - If this device for operation in the band 5150 – 5350 MHz, it is for indoor use only. • This equipment should be installed and operated with a minimum distance of 20 cm between the radio equipment and your body. - The maximum RF power operating for each band as follows: • the band 2,400 to 2,483.5 MHz is 97.95 mW, • the bands 5,150 MHz to 5,350 MHz is 191.87 mW, • the 5,470 MHz to 5,725 MHz is 963.83 mW. List of national codes
COUNTRYISO 3166 2 LETTER CODECOUNTRYISO 3166 2 LETTER CODE
Austria AT Liechtenstein LI
Belgium BE Lithuania LT
Bulgaria BG Luxembourg LU
CroatiaHRMallaMT
CyprusCYNetherlandsNL
Czech RepublicCZNorwayNO
DenmarkDKPolandPL
EstoniaEEPortugalPT
FinlandFIRomaniaRO
FranceFRSerbiaRS
GermanyDESlovakiaSK
GreeceGRSloveniaSI
HungaryHUSpainES
IcelandISSwitzerlandCH
IrelandIESwedenSE
ItalyITTurkeyTR
LatviaLVUnited KingdomGB

Safety Warnings

- Do not use this product near water, for example, in a wet basement or near a swimming pool. - Do not expose your device to dampness, dust or corrosive liquids. - Do not store things on the device. - Do not obstruct the device ventilation slots as insufficient airflow may harm your device. For example, do not place the device in an enclosed space such as a box or on a very soft surface such as a bed or sofa. - Do not install, use, or service this device during a thunderstorm. There is a remote risk of electric shock from lightning. - Connect ONLY suitable accessories to the device. - Do not open the device or unit. Opening or removing covers can expose you to dangerous high voltage points or other risks. • Only qualified service personnel should service or disassemble this device. Please contact your vendor for further information. - Make sure to connect the cables to the correct ports. - Place connecting cables carefully so that no one will step on them or stumble over them. • Always disconnect all cables from this device before servicing or disassembling. - Do not remove the plug and connect it to a power outlet by itself; always attach the plug to the power adaptor first before connecting it to a power outlet. - Do not allow anything to rest on the power adaptor or cord and do NOT place the product where anyone can walk on the power adaptor or cord. - Please use the provided or designated connection cables/power cables/ adaptors. Connect it to the right supply voltage (for example, 110V AC in North America or 230V AC in Europe). If the power adaptor or cord is damaged, it might cause electrocution. Remove it from the device and the power source, repairing the power adapter or cord is prohibited. Contact your local vendor to order a new one. - Do not use the device outside, and make sure all the connections are indoors. There is a remote risk of electric shock from lightning. - CAUTION: Risk of explosion if battery is replaced by an incorrect type, dispose of used batteries according to the instruction. Dispose them at the applicable collection point for the recycling of electrical and electronic devices. For detailed information about recycling of this product, please contact your local city office, your household waste disposal service or the store where you purchased the product. - The following warning statements apply, where the disconnect device is not incorporated in the device or where the plug on the power supply cord is intended to serve as the disconnect device, - For permanently connected devices, a readily accessible disconnect device shall be incorporated external to the device; - For pluggable devices, the socket-outlet shall be installed near the device and shall be easily accessible. • CLASS 1 LASER PRODUCT • APPAREIL À LASER DE CLASS 1 • PRODUCT COMPLIES WITH 21 CFR 1040.10 AND 1040.11. • PRODUIT CONFORME SELON 21 CFR 1040.10 ET 1040.11.

Environment Statement

Zyxel products put on the EU market in compliance with the requirement of the European Parliament and the Council published Directive 2009/125/EC establishing a framework for the setting of ecodesign requirements for energy-related products (recast), so called as "ErP Directive (Energy-related Products directive) as well as ecodesign requirement laid down in applicable implementing measures, power consumption has satisfied regulation requirements which are: • Network standby power consumption < 8W, and/or - Off mode power consumption < 0.5W, and/or - Standby mode power consumption < 0.5W .

European Union – Disposal and Recycling Information

The symbol below means that according to local regulations your product and/or its battery shall be disposed of separately from domestic waste. If this product is end of life, take it to a recycling station designated by local authorities. At the time of disposal, the separate collection of your product and/or its battery will help save natural resources and ensure that the environment is sustainable development. Die folgende Symbol bedeutet, dass Ihr Produkt und/oder seine Batterie gemäß den örtlichen Bestimmungen getrennt vom Hausmüll entsorgt werden muss. Wenden Sie sich an eine Recyclingstation, wenn dieses Produkt das Ende seiner Lebensdauer erreicht hat. Zum Zeitpunkt der Entsorgung wird die getrennte Sammlung von Produkt und/oder seiner Batterie dazu beitragen, natürliche Ressourcen zu sparen und die Umwelt und die menschliche Gesundheit zu schützen. El símbolo de abajo indica que según las regulaciones locales, su producto y/o su batería deberán depositarse como basura separada de la doméstica. Cuando este producto alcance el final de su vida útil, llévelo a un punto limpio. Cuando llegue el momento de desechar el producto, la recogida por separado éste y/o su batería ayudará a salvar los recursos naturales y a proteger la salud humana y medioambiental. Le symbole ci-dessous signifie que selon les réglementations locales votre produit et/ou sa batterie doivent être éliminés séparément des ordures ménagères. Lorsque ce produit atteint sa fin de vie, amenez-le à un centre de recyclage. Au moment de la mise au rebut, la collecte séparée de votre produit et/ou de sa batterie aidera à économiser les ressources naturelles et protéger l'environnement et la santé humaine. Il simbolo sotto significa che secondo i regolamenti locali il vostra prodotto e/o batteria deve essere smaltito separatamente dai rifiuti domestici. Quando questo prodotto raggiunge la fine della vita di servizio portario a una stazione di riciclaggio. Al momento dello smaltimento, la raccolta separata del vostro prodotto e/o della sua batteria aluta a risparmiare risorse naturali e a proteggere l'ambiente e la salute umana. Symbolen innebär att enligt lokal lagstiftning ska produkten och/eller dess batteri kastas separat från hushållsavfallet. När den här produkten när slutet av sin livslängd ska du ta den till en återvinningsstation. Vid liiden för kasseringen bidrar du till en bättre miljö och mänsklig hälsa genom att göra dig av med den på ett återvinningsställe. ![](images/dcb91f4b4bbece60c06dc2a58536a2b99750497c9af077c108428a94aa32a001.jpg)

台灣

![](images/aab2611e3c5e004dd733e5716c5aa0cbaa9ac800eefb1a2bbbed0e3b1d95b3a6.jpg)
natural_image Abstract black wave-like pattern on white background (no text or symbols)
安全警告-為了您的安全,請先閱讀以下警告及指示: - 請勿將此產品接近水、火焰或放置在高溫的環境。 - 避免設備接觸 任何液體 - 切勿讓設備接觸水、雨水、高濕度、污水腐蝕性的液體或其他水份。 \- 灰塵及污物 - 切勿接觸灰塵、污物、沙土、食物或其他不合適的材料。 - 雷雨天氣時,不要安裝,使用或維修此設備。有遭受電擊的風險。 - 切勿重摔或撞擊設備,並勿使用不正確的電源變壓器。 - 若接上不正確的電源變壓器會有爆炸的風險。 - 請勿隨意更換產品內的電池 - 如果更換不正確之電池型式,會有爆炸的風險,請依製造商說明言處理使用過之電池。 - 請將廢電池丟棄在適當的電器或電子設備回收處。 - 請勿將設備解體 \- 請勿阻礙設備的散熱孔,空氣對流不足將會造成設備損害。 • 請插在正確的電壓供給插座(如:北美 / 台灣電壓 110V AC · 欧洲是 230V AC) - 假若電源變壓器或電源變壓器的纜線損壞,請從插座拔除,若您還繼續插電使用,會有觸電死亡的風險。 • 請勿試圖修理電源變壓器或電源變壓器的纜線,若有毀損,請直接聯絡您購買的店家,購買一個新的電源變壓器。 - 請勿將此設備安裝於室外,此設備僅適合放置於室內。 - 請勿隨一般垃圾丟棄 - 請參閱產品背貼上的設備額定功率。 ·請參考產品型錄或是彩盒上的作業溫度。 · 產品沒有斷電裝置或者採用電源線的插頭視為斷電裝置的一部分,以下警語將適用: \- 對永久連接之設備。在設備外部須安裝可觸及之斷電裝置; \- 對插接式之設備,插座必須接近安裝之地點而且是易於觸及的。

以下訊息僅適用於產品具有無線功能且銷售至台灣地區 (USG FLEX 100W)

• 第十二條 經型式認證合格之低功率射頻電機,非經許可,公司、商號或使用者均不得擅自變更頻率、加大功率或變更原設計之特性及功能。 - 第十四條 低功率射頻電機之使用不得影響飛航安全及干擾合法通信;經發現有干擾現象時,應立即停用,並改善至無干擾時方得繼續使用。 - 前項合法通信,指依電信法規定作業之無線電通信。低功率射頻電機須忍受合法通信或工業、科學及醫療用電波輻射性電機設備之干擾。 - 無線資訊傳輸設備忍受合法通信之干擾且不得干擾合法通信;如造成干擾,應立即停用,俟無干擾之虞,始得繼續使用。 - 無線資訊傳輸設備的製造廠商應確保頻率穩定性,如依製造廠商使用手冊上所述正常操作,發射的信號應維持於操作頻帶中 - 使用無線產品時,應避免影響附近雷達系統之操作。 - 高增益指向性天線只得應用於固定式點對點系統。

About the Symbols

Various symbols are used in this product to ensure correct usage, to prevent danger to the user and others, and to prevent property damage. The meaning of these symbols are described below. It is important that you read these descriptions thoroughly and fully understand the contents. Explanation of the Symbols
SYMBOL EXPLANATION
ZYXEL USGFLEX700-GB0101F - About the Symbols - 1Alternating current (AC):AC is an electric current in which the flow of electric charge periodically reverses direction.
ZYXEL USGFLEX700-GB0101F - About the Symbols - 2Direct current (DC):DC if the unidirectional flow or movement of electric charge carriers.
ZYXEL USGFLEX700-GB0101F - About the Symbols - 3Earth; ground:A wiring terminal intended for connection of a Protective Earthing Conductor.
ZYXEL USGFLEX700-GB0101F - About the Symbols - 4Class II equipment:The method of protection against electric shock in the case of class II equipment is either double insulation or reinforced insulation.

Viewing Certifications

Go to http://www.zyxel.com to view this product's documentation and certifications.

Zyxel Limited Warranty

Zyxel warrants to the original end user (purchaser) that this product is free from any defects in material or workmanship for a specific period (the Warranty Period) from the date of purchase. The Warranty Period varies by region. Check with your vendor and/or the authorized Zyxel local distributor for details about the Warranty Period of this product. During the warranty period, and upon proof of purchase, should the product have indications of failure due to faulty workmanship and/or materials, Zyxel will, at its discretion, repair or replace the defective products or components without charge for either parts or labor, and to whatever extent it shall deem necessary to restore the product or components to proper operating condition. Any replacement will consist of a new or re-manufactured functionally equivalent product of equal or higher value, and will be solely at the discretion of Zyxel. This warranty shall not apply if the product has been modified, misused, tampered with, damaged by an act of God, or subjected to abnormal working conditions.

Note

Repair or replacement, as provided under this warranty, is the exclusive remedy of the purchaser. This warranty is in lieu of all other warranties, express or implied, including any implied warranty of merchantability or fitness for a particular use or purpose. Zyxel shall in no event be held liable for indirect or consequential damages of any kind to the purchaser. To obtain the services of this warranty, contact your vendor. You may also refer to the warranty policy for the region in which you bought the device at http://www.zyxel.com/web/support\_warranty\_info.php.

Registration

Register your product online at www.zyxel.com to receive email notices of firmware upgrades and related information.

Trademarks

ZyNOS (Zyxel Network Operating System) and ZON (Zyxel One Network) are registered trademarks of Zyxel Communications, Inc. Other trademarks mentioned in this publication are used for identification purposes only and may be properties of their respective owners.

Open Source Licenses

This product may contain in part some free software distributed under GPL license terms and/or GPL like licenses. Open source licenses are provided with the firmware package. You can download the latest firmware at www.zyxel.com. If you cannot find it there, contact your vendor or Zyxei Technical Support at support@zyxel.com.tw. To obtain the source code covered under those Licenses, please contact your vendor or Zyxel Technical Support at support@zyxel.com.

Regulatory Notice and Statement (Class A)

Model List: USG FLEX 500, USG FLEX 700

United States of America

![](images/13b224e240debe5644a5677af8908981064ce89775debe4facc044dea4fe084b.jpg) The following information applies if you use the product within USA area. US Importer: Zyxel Communications, Inc., 1130 North Miller Street Anaheim, CA92806-2001, https://www.zyxel.com/us/en/

FCC EMC Statement

\- This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) This device must accept any interference received, including interference that may cause undesired operation. - Changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment. - This device has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instruction manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense.

Canada

The following information applies if you use the product within Canada area

Innovation, Science and Economic Development Canada Industry ICES Statement

CAN ICES-3 (A)/NMB-3(A)

European Union

![](images/b10142556756edfdfa9e8850d1e2c78df597381fccf4a06d264ea8aa16314b0f.jpg) The following information applies if you use the product within the European Union.

CE EMC statement

WARNING: This equipment is compliant with Class A of EN55032. In a residential environment this equipment may cause radio interference. List of National Codes
COUNTRYISO 3166 2 LETTER CODECOUNTRYISO 3166 2 LETTER CODE
Austria AT Liechlenstein LI
Belgium BE Lithuania LT
Bulgaria BG Luxembourg LU
Croatia HR Malta MT
CyprusCYNetherlandsNL
Czech RepublicCRNorwayNO
DenmarkDKPolandPL
EstoniaEEPortugalPT
FinlandFIRomaniaRO
FranceFRSerbiaRS
GermanyDESlovakiaSK
GreeceGRSloveniaSI
HungaryHUSpainES
IcelandISSwedenSE
IrelandIESwitzerlandCH
ItalyITTurkeyTR
LatviaLVUnited KingdomGB

Safety Warnings

- Do not use this product near water, for example, in a wet basement or near a swimming pool. - Do not expose your device to dampness, dust or corrosive liquids. - Do not store things on the device. - Do not obstruct the device ventilation slots as insufficient airflow may harm your device. For example, do not place the device in an enclosed space such as a box or on a very soft surface such as a bed or sofa. - Do not install, use, or service this device during a thunderstorm. There is a remote risk of electric shock from lightning. - Connect ONLY suitable accessories to the device. \- Do not open the device or unit. Opening or removing covers can expose you to dangerous high voltage points or other risks. Only qualified service personnel should service or disassemble this device. Please contact your vendor for further information. \- Make sure to connect the cables to the correct ports. \- Place connecting cables carefully so that no one will step on them or stumble over them. • Always disconnect all cables from this device before servicing or disassembling. \- Do not remove the plug and connect it to a power outlet by itself; always attach the plug to the power adaptor first before connecting it to a power outlet. \- Do not allow anything to rest on the power adaptor or cord and do NOT place the product where anyone can walk on the power adaptor or cord. \- Please use the provided or designated connection cables/power cables/ adaptors. Connect it to the right supply voltage (for example, 110V AC in North America or 230V AC in Europe). If the power adaptor or cord is damaged, it might cause electrocution. Remove it from the device and the power source, repairing the power adapter or cord is prohibited. Contact your local vendor to order a new one. \- Do not use the device outside, and make sure all the connections are indoors. There is a remote risk of electric shock from lightning. \- Caution: Risk of explosion if battery is replaced by an incorrect type, dispose of used batteries according to the instruction. Dispose them at the applicable collection point for the recycling of electrical and electronic device. For detailed information about recycling of this product, please contact your local city office, your household waste disposal service or the store where you purchased the product. \- Use ONLY power wires of the appropriate wire gauge for your device. Connect it to a power supply of the correct voltage. \- Fuse Warning! Replace a fuse only with a fuse of the same type and rating. • The POE (Power over Ethernet) devices that supply or receive power and their connected Ethernet cables must all be completely indoors. \- The following warning statements apply, where the disconnect device is not incorporated in the device or where the plug on the power supply cord is intended to serve as the disconnect device, \- For permanently connected devices, a readily accessible disconnect device shall be incorporated external to the device; \- For pluggable devices, the socket-outlet shall be installed near the device and shall be easily accessible. \- This device must be grounded by qualified service personnel. Never defeat the ground conductor or operate the device in the absence of a suitably installed ground conductor. Contact the appropriate electrical inspection authority or an electrician if you are uncertain that suitable grounding is available. If your device has an earthing screw (frame ground), connect the screw to a ground terminal using an appropriate AWG ground wire. Do this before you make other connections. If your device has no earthing screw, but has a 3-prong power plug, make sure to connect the plug to a 3-hole earthed socket. \- When connecting or disconnecting power to hot-pluggable power supplies, if offered with your system, observe the following guidelines: \- Install the power supply before connecting the power cable to the power supply. \- Unplug the power cable before removing the power supply. \- If the system has multiple sources of power, disconnect power from the system by unplugging all power cables from the power supply. • CLASS 1 LASER PRODUCT • APPAREIL À LASER DE CLASS 1 • PRODUCT COMPLIES WITH 21 CFR 1040.10 AND 1040.11. • PRODUIT CONFORME SELON 21 CFR 1040.10 ET 1040.11.

Environment Statement

European Union – Disposal and Recycling Information

The symbol below means that according to local regulations your product and/or its battery shall be disposed of separately from domestic waste. If this product is end of life, take it to a recycling station designated by local authorities. At the time of disposal, the separate collection of your product and/or its battery will help save natural resources and ensure that the environment is sustainable development. Die folgende Symbol bedeutet, dass Ihr Produkt und/oder seine Batterie gemäß den örtlichen Bestimmungen getrennt vom Hausmüll entsorgt werden muss. Wenden Sie sich an eine Recyclingstation, wenn dieses Produkt das Ende seiner Lebensdauer erreicht hat. Zum Zeitpunkt der Entsorgung wird die getrennte Sammlung von Produkt und/oder seiner Batterie dazu beitragen, natürliche Ressourcen zu sparen und die Umwelt und die menschliche Gesundheit zu schützen. El símbolo de abajo indica que según las regulaciones locales, su producto y/o su batería deberán depositarse como basura separada de la doméstica. Cuando este producto alcance el final de su vida útil, lívelo a un punto limpio. Cuando llegue el momento de desechar el producto, la recogida por separado éste y/o su batería ayudará a salvar los recursos naturales y a proteger la salud humana y medioambiental. Le symbole ci-dessous signifie que selon les réglementations locales votre produit et/ou sa batterie doivent être éliminés séparément des ordures ménagères. Lorsque ce produit atteint sa fin de vie, amenez-le à un centre de recyclage. Au moment de la mise au rebut, la collecte séparée de votre produit et/ou de sa batterie aidera à économiser les ressources naturelles et protéger l'environnement et la santé humaine. Il simbolo sotto significa che secondo i regolamenti locali il vostro prodotto e/o batteria deve essere smaltito separatamente dai rifiuti domestici. Quando questo prodotto raggiunge la fine della vita di servizio portario a una stazione di riciclaggio. Al momento dello smallimento, la raccolla separata del vostro prodotto e/o della sua batteria aiuta a risparmiare risorse naturali e a proteggere l'ambiente e la salute umana. Symbolen innebär att enligt lokal lagslittning ska produkten och/eller dess batteri kastas separat från hushållsavfallet. När den här produkten när slutet av sin livslängd ska du ta den till en återvinningsstation. Vid tiden för kasseringen bidrar du till en bättre miljö och månsklig hälsa genom att göra dig av med den på ett återvinningsställe. ![](images/c03978503793292b9308e19eb08fe134a552ed0b0133fa6fc91a20cca824625d.jpg)
natural_image Simple line drawing of a trash bin with crossed lines indicating no waste or discharge (no text or symbols)

台灣

![](images/f1057128f0a35639e19393fdc08787ed2bd717a451b4995aedc94e456fc27268.jpg)

警告使用者

- 這是甲類的資訊產品,在居住的環境中使用時,可能會造成射頻干擾,在這種情況下,使用者會被要求採取某些適當的對策。 安全警告-為了您的安全,請先閱讀以下警告及指示: - 請勿將此產品接近水、火焰或放置在高溫的環境。 - 避免設備接觸: \- 任何液體 - 切勿讓設備接觸水、雨水、高濕度、污水腐蝕性的液體或其他水份。 \- 灰塵及污物 - 切勿接觸灰塵、污物、沙土、食物或其他不合適的材料。 - 雷雨天氣時,不要安裝,使用或維修此設備。有遭受電擊的風險。 - 切勿重摔或撞擊設備,並勿使用不正確的電源變壓器。 - 若接上不正確的電源變壓器會有爆炸的風險。 - 請勿隨意更換產品內的電池 - 如果更換不正確之電池型式,會有爆炸的風險,請依製造商說明書處理使用過之電池。 - 請將廢電池丟棄在適當的電器或電子設備回收處。 - 請勿將設備解體。 - 請勿阻礙設備的散熱孔,空氣對流不足將會造成設備損害。 • 請插在正確的電壓供給插座(如:北美/台灣電壓 110V AC,歐洲是 230V AC)。 - 假若電源變壓器或電源變壓器的纜線損壞,請從插座拔除,若您還繼續插電使用,會有觸電死亡的風險。 • 請勿試圖修理電源變壓器或電源變壓器的繞線,若有毀損,請直接聯絡您購買的店家,購買一個新的電源變壓器。 - 請勿將此設備安裝於室外,此設備僅適合放置於室內。 - 請勿隨一般垃圾丟棄 ·請參閱產品背貼上的設備額定功率。 - 請參考產品型錄或是彩盒上的作業溫度。 · 產品沒有斷電裝置或者採用電源線的插頭視為斷電裝置的一部分,以下警語將適用: \- 對永久連接之設備,在設備外部須安裝可觸及之斷電裝置; \- 對插接式之設備,插座必須接近安裝之地點而且是易於觸及的。

About the Symbols

Various symbols are used in this product to ensure correct usage, to prevent danger to the user and others, and to prevent property damage. The meaning of these symbols are described below. It is important that you read these descriptions thoroughly and fully understand the contents. Explanation of the Symbols
SYMBOL EXPLANATION
ZYXEL USGFLEX700-GB0101F - About the Symbols - 1Alternating current (AC):AC is an electric current in which the flow of electric charge periodically reverses direction.
ZYXEL USGFLEX700-GB0101F - About the Symbols - 2Direct current (DC):DC if the unidirectional flow or movement of electric charge carriers.
ZYXEL USGFLEX700-GB0101F - About the Symbols - 3Earth; ground:A wiring terminal intended for connection of a Protective Earthing Conductor.
ZYXEL USGFLEX700-GB0101F - About the Symbols - 4Class II equipment:The method of protection against electric shock in the case of class II equipment is either double insulation or reinforced insulation.

Viewing Certifications

Go to http://www.zyxel.com to view this product's documentation and certifications.

Zyxel Limited Warranty

Zyxel warrants to the original end user (purchaser) that this product is free from any defects in material or workmanship for a specific period (the Warranty Period) from the date of purchase. The Warranty Period varies by region. Check with your vendor and/or the authorized Zyxel local distributor for details about the Warranty Period of this product. During the warranty period, and upon proof of purchase, should the product have indications of failure due to faulty workmanship and/or materials, Zyxel will, at its discretion, repair or replace the defective products or components without charge for either parts or labor, and to whatever extent it shall deem necessary to restore the product or components to proper operating condition. Any replacement will consist of a new or re-manufactured functionally equivalent product of equal or higher value, and will be solely at the discretion of Zyxel. This warranty shall not apply if the product has been modified, misused, tampered with, damaged by an act of God, or subjected to abnormal working conditions.

Note

Repair or replacement, as provided under this warranty, is the exclusive remedy of the purchaser. This warranty is in lieu of all other warranties, express or implied, including any implied warranty of merchantability or fitness for a particular use or purpose. Zyxel shall in no event be held liable for indirect or consequential damages of any kind to the purchaser. To obtain the services of this warranty, contact your vendor. You may also refer to the warranty policy for the region in which you bought the device at http://www.zyxel.com/web/support\_warranty\_info.php.

Registration

Register your product online at www.zyxel.com to receive email notices of firmware upgrades and related information.

Open Source Licenses

This product may contain in part some free software distributed under GPL license terms and/or GPL like licenses. Open source licenses are provided with the firmware package. You can download the latest firmware at www.zyxel.com. If you cannot find it there, contact your vendor or Zyxei Technical Support at support@zyxel.com.tw. To obtain the source code covered under those Licenses, please contact your vendor or Zyxel Technical Support at support@zyxel.com.

Index

Symbols

Numbers

3322 Dynamic DNS 352 3DES 446 6in4 tunneling 275 6to4 tunneling 275

A

AAA Base DN 787 Bind DN 787, 790 directory structure 786 Distinguished Name, see DN DN 787, 788, 790 password 790 port 790, 792 search time limit 790 SSL 790 AAA server 784 AD 786 and users 714 directory service 785 LDAP 785, 786 local user database 786 RADIUS 785, 786, 791 RADIUS group 791 see also RADIUS access 33 access control attacks 654 Access Point Name, see APN Access Restricted Web Page Response Message 894 access users 713, 715 custom page 863 forcing login 482 idle timeout 726 logging in 482 multiple logins 727 see also users 713 Web Configurator 728 access users, see also force user authentication policies account dynamic guest 138 quota (T/U/D) 139 user 713,822 accounting server 784 Active Directory, see AD active protocol 450 AH 450 and encapsulation 450 ESP 450 active sessions 118, 135 ActiveX 615 AD 785, 787, 788, 790 directory structure 786 Distinguished Name, see DN password 790 port 790, 792 search time limit 790 SSL 790 address groups 764 and content filtering 595, 596 and FTP 882 and security policy 486 and SNMP 887 and SSH 877 and Telnet 880 and WWW 863 address objects 764 and content filtering 595, 596 and FTP 882 and NAT 333, 363 and policy routes 332 and security policy 486 and SNMP 887 and SSH 877 and Telnet 880 and VPN connections 423 and WWW 863 HOST 765 RANGE 765 SUBNET 765 types of 765, 771 address record 852 admin user troubleshooting 973 admin users 713 multiple logins 727 see also users 713 ADP 572 false negatives 574 false positives 574 inline profile 574 monitor profile 574 Advanced Encryption Standard, see AES advertisement remove 557 URL entries 558 web page 557 AES 446 AF 336 AH 429,450 and transport mode 451 alerts 907, 908, 910, 911, 912, 913 IDP 700, 701 ALG 381, 387 and NAT 381, 383 and policy routes 383, 387 and security policy 381, 383 and trunks 387 FTP 381, 382 H.323 381, 382, 387 peer-to-peer calls 383 RTP 387 see also VoIP pass through 381 SIP 381, 382 and anti-malware 628 Anomaly Detection and Prevention, see ADP Anonymizer 642, 646 anti-malware 620 boot sector virus 638 EICAR 627, 636 e-mail virus 638 encryption 628 file decompression 628, 634 file infector 638 file infector virus 638 firmware package blocking 628, 634 infection and prevention 638 macro virus 638 malware life cycle 638 malware types 638 mutation virus 638 overview 620 packet scan 620 packet types 621 polymorphic virus 638 scanner types 638 signatures 631 statistics 179 virus 620 worm 620 anti-spam 675, 678, 679, 684 action for spam mails 678, 684 black list 675, 678, 679, 684 concurrent e-mail sessions 186 DNSBL 676, 678, 684 e-mail header buffer 676 e-mail headers 676 general settings 677 identifying legitimate e-mail 675 identifying spam 675 POP2 676 POP3 676 regular expressions 682 SMTP 676 white list 675, 678, 680, 684 anti-virus EICAR 627, 636 e-mail virus 638 polymorphic virus 638 statistics 179 troubleshooting 964, 967 troubleshooting signatures update 964 updating signatures 200 AP antenna orientation 162 group 159 management icons 152 status 152 status icons 155 ZyMesh Profile 162 AP group 208, 212 APN 270 Application Layer Gateway, see ALG application patrol 586 actions 586 and HTTP redirect 376 and security policy 586 classification 586 exceptions 586 port-less 586 ports 587 service ports 587 troubleshooting 964, 969, 970, 972 ASAS (Authenex Strong Authentication System) 785 asymmetrical routes 566 allowing through the security policy 569 vs virtual interfaces 566 attacks access control 654 backdoor 655 buffer overflow 655 Denial of Service (DoS) 427 DoS/DDoS 655 IM 655 P2P 655 scan 655 spam 655 trapdoor 655 trojan 655 virus 620, 656 worm 656 Authenex Strong Authentication System (ASAS) 785 authentication in IPSec 430 LDAP/AD 786 server 784 authentication algorithms 445, 446 and active protocol 445 MD5 446 SHA1 446 Authentication Header, see AH authentication method objects 794 and users 714 and WWW 862 create 795 example 794 authentication policy exceptional services 484 Authentication server RADIUS client 890 authentication server 889, 891 authentication type 84, 821 Authentication, Authorization, Accounting servers, see AAA server authorization server 784 Autonomous Systems (AS) 346 auxiliary interfaces 229

B

backdoor attacks 655 backing up configuration files 917 bandwidth egress 271, 280 ingress 271, 280 bandwidth limit troubleshooting 966 bandwidth management 586 maximize bandwidth usage 336, 469 see also application patrol 586 troubleshooting 966 Base DN 787 Batch import 834 BGP 351 billing accumulation accounting method 513 built-in billing 513 credit card service 525 discount pricing plan 523 identity token 526 online payment service 527 printout 520 profile 513, 516 quota (T/U/D) 517 quota type 523 SMS message 519 time-to-finish accounting method 513 user logon settings 515 Bind DN 787, 790 BitTorrent 655 black list 678, 679, 684 anti-spam 675 Blaster 673 bridge interfaces 229, 295 and virtual interfaces of members 296 basic characteristics 229 effect on routing table 296 member interfaces 296 virtual 254 bridges 295 buffer overflow 655 buffer overflow attacks 655

C

CA and certificates 803 CA (Certificate Authority), see certificates Calling Station ID 746, 748, 750, 753, 756 capturing packets 937, 940 card SIM 271 CEF (Common Event Format) 905, 911 cellular 265 APN 270 interfaces 229 network types 144 signal quality 144, 145 SIM card 271 SIM Card IMSI 145 status 143, 146 system 144, 145 troubleshooting 965, 966 certificate troubleshooting 973 Certificate Authority (CA) see certificates Certificate Revocation List (CRL) 803 vs OCSP 819 certificates 802 advantages of 803 and CA 803 and FTP 882 and HTTPS 859 and IKE SA 450 and SSH 877 and VPN gateways 423 and WWW 861 certification path 803, 811, 817 expired 803 factory-default 804 file formats 804 fingerprints 812, 818 importing 808 in IPSec 436 not used for encryption 803 revoked 803 self-signed 804, 810 serial number 812, 817 storage space 806, 814 thumbprint algorithms 805 thumbprints 805 used for authentication 803 verifying fingerprints 804 certification requests 810 certifications 988 viewing 991, 995 Challenge Handshake Authentication Protocol (CHAP) 821 CHAP (Challenge Handshake Authentication Protocol) 821 CHAP/PAP 821 CLI 32,40 button 40 messages 40 popup window 40 Reference Guide 2 commands 32 sent by Web Configurator 40 Common Event Format (CEF) 905, 911 compression (stac) 822 computer names 250, 292, 305, 323, 463 computer virus 620 see also virus concurrent e-mail sessions 186 configuration information 931 configuration file troubleshooting 974 configuration files 915 at restart 918 backing up 917 downloading 919, 951 downloading with FTP 881 editing 915 how applied 916 lastgood.conf 918, 920
Table of contents Click a title to access it
Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : ZYXEL

Model : USGFLEX700-GB0101F

Category : Firewall