Dormakaba

HSW-GP - Door Dormakaba - Free user manual and instructions

Find the device manual for free HSW-GP Dormakaba in PDF.

📄 9 pages English EN Download 💬 AI Question 10 questions ⚙️ Specs
Notice Dormakaba HSW-GP - page 1
Pick your language and provide your email: we'll send you a specifically translated version.
Product Type Sliding door system (sliding partition with pivoting end panel)
Brand Dormakaba
Model HSW-GP
Category Door
Installation Type Ceiling-mounted track rail on steel substructure
Panel Type Glass panels with single-point fixings
Track Rail Fixing Interval (Straight) Approx. 300 mm
Track Rail Fixing Interval (Stacking Area) Approx. 100 mm
Carrier Attachment Torque 25 Nm (M10 hexagonal socket screw)
Single-Point Fixing Tightening Torque 15 Nm (countersunk fastener)
Height Adjustment Range Via floor spring (+4 mm) and plastic shims
Panel Clearance from Wall (Pivoting End) 8 mm
Panel Clearance from Wall (Sliding End) 3 mm
Clearance Between Panels 5 mm
Eccentric Socket Hole Diameter 25 mm (depth 30 mm)
Eccentric Socket Offset from Glass Centerline 43.5 mm
Maintenance Keep locks and bolts in good order; regularly clean floor keeps; lubricate as needed
Roller Replacement Possible via removable maintenance end piece
Safety Features Stop lugs must face outer edges; torque values must be observed; correct alignment critical
Weight Capacity Ceiling substructure must accommodate total panel weight (specific value not given)

Frequently Asked Questions - HSW-GP Dormakaba

What is the recommended ceiling substructure for the track rail?
The track rail must be bolted to a correctly aligned horizontal ceiling steel substructure (e.g., DORMA substructure system) over its entire length. The substructure should accommodate the total weight of all panels with fixing intervals of approx. 300 mm along straight sections and approx. 100 mm in the stacking area.
How do I align the glass panels vertically?
After threading the panels onto the track, use the set screw (3) on the carrier to adjust vertical alignment. Once aligned, tighten the M10 hexagonal socket screw to a torque of 25 Nm.
What torque should I use for the single-point fixings?
The tapered countersunk fastener should be tightened to 15 Nm using a torque wrench. The carrier M10 hexagonal socket screw is tightened to 25 Nm.
How do I replace a defective roller?
Remove the maintenance end piece (b) to access the rollers. The guide plate must always remain attached. Replace the defective roller and reattach the end piece.
What is the correct clearance between panels and from walls?
The pivoting end panel should have an 8 mm clearance from the wall. The last sliding panel should have a 3 mm clearance. Clearance between panels should be 5 mm.
How do I adjust the door height?
Door height can be adjusted via the floor spring (+4 mm) using four adjustment screws. Further adjustment is possible with plastic shims between the spindle section and pivot rod (requires door removal). Ensure top door clearance is maintained.
Where should the stop lugs face?
The stop lugs (a) on the carriers must face towards the outer edges of the glass panels. This is critical for proper operation.
How do I install the eccentric sockets for floor locking?
Mark positions plumb below lock bolts (offset 43.5 mm from glass centerline). Drill holes 25 mm diameter, 30 mm deep for sockets, and 8 mm for anchor plugs. Insert double eccentric sockets, align, and fix with central screw.
Can I use the system with a floor spring?
Yes, the system supports floor springs (e.g., DORMA BTS 75V or BTS 84). A recess must be provided for the spring, which is later covered with a stainless steel plate. Adjust floor pivot to 65 mm distance and use shims for height adjustment.
How do I thread the panels onto the track?
Detach the maintenance end piece to create an opening. Thread the panels with mounted rollers onto the track. Adjust height using nut (a) and lock with nut (b) (both 17 mm Allan key). Counter-clockwise rotation increases height.

User questions about HSW-GP Dormakaba

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Door in PDF format for free! Find your manual HSW-GP - Dormakaba and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. HSW-GP by Dormakaba.

USER MANUAL HSW-GP Dormakaba

HSW-GP Installation instructions

Note: The as-delivered condition is indicated in the manufacturing drawing enclosed.

1. Ceiling substructure for track rail and installation of the track rail:

The track rail must be bolted over its entire length (including the stacking track area) to a correctly aligned horizontal (longitudinally and transversely) ceiling steel substructure (e.g. DORMA substructure system).

The steel substructure should be designed to accommodate the total weight of all the panels both in the stacking area and in the partition section. The fixing point intervals for the track rail should be approx. 300 mm along the straight sections and approx. 100 mm in the stacking area.

Caution: All the track joints (except the maintenance end piece, Section 5, page 7) must be provided with connection pins (a) in order to ensure a flush transition between the track sections and thus smooth sliding panel operation. (Fig. 1)

Dormakaba HSW-GP - Ceiling substructure for track rail and installation of the track rail: - 1

natural_image Technical line drawings of mechanical components, including heat exchanger and heating element assembly (no text or symbols)

2. Mounting the glass panel fittings (Fig. 2A):

A Mounting the single-point fixings to the glass:

Insert clamping collar (2) together with the tapered countersunk fastener (1) in the glass bore. Place the intermediate layer (3) in the nut (4) and screw the nut onto the countersunk fastener. Using the special wrench, pre-assemble and then tighten with a torque wrench (tightening torque = 15 Nm).

Fig. 2A

B Installing the carriers (Fig. 2B):

Loosely attach the carrier to the single-point fixings using M10 hexagonal socket screw (1) and washer (2). Use 7 mm Allan key. This enables the panels to be vertically aligned by means of set screw (3) once threaded onto the track. After alignment (Section 8), tighten hexagonal socket screw to a torque of 25 Nm. The stop lugs (a) must face towards the outer edges of the glass panels.

Tap caps (b) onto the socket screws with a rubber mallet.

Track roller a b Single-point fixing 1 2 3 Fig. 2B

Ca Installing bottom strap (a) and floor bolt (b) (Fig. 2Ca):

A Using M10 hexagonal socket screws (2), mount bottom strap (1) to the single-point fixings (7 mm Allan key, screw tightening torque 25 Nm).

Tap caps (3) onto the socket screws with a rubber mallet.

B Mount floor bolt (4) to the single-point fixings using M10 hexagonal socket screws (5) and countersunk fastener (6) (7 mm Allan key, screw tightening torque 25 Nm).

Tap caps (7) onto the socket screws with a rubber mallet.

Caution: Bear in mind the direction of travel of the panels and ensure that the stop lugs are facing out.

a 2 3 1 b 6 5 4 7 Direction of travel Bottom strap Floor bolt Fig. 2Ca

Cb Mounting a fixed panel (Fig. 2Cb):

Install eccentric sockets (bolt keeps) in the floor as per Section 9. Hang the fixed panel from the track at the top rollers. Insert the spigot of the fixed panel bottom strap (1) in the eccentric socket and fix with M10 hexagonal socket screws (2) to the single-point fixings (7 mm Allan key, screw tightening torque 25 Nm). Tap caps (3) onto the socket screws with a rubber mallet. Ensure correct handing (see details A + B) and ensure that the stop lugs (a) are facing out.

Fig. 2Cb Fixed panel bottom strap Fixed panel bottom strap

3. Mounting of floor spring (BTS) and floor pivot (Fig. 3a+b):

For the floor spring (BTS), a recess must be provided (see drawing) which is subsequently covered with a stainless steel plate.

Adjust the floor pivot (a) to the distance of 65 mm indicated.

Loosen fixing screws (b), move floor pivot and re-tighten screws.

Adjust the height using the shims provided (3 shims of 1 mm thick each).

65 8 b a ±3 27 40 7

Fig. 3a

a) BTS 75 V DORMA BTS 75V 60 65 55 36 48.5 6 285 82

b) BTS 84 DORMA BTS 84 4.0

65 55 49 18.5 15 306 108

Fig. 3b

4. Mounting the pivoting door panel (Fig. 4a+b)

a) Preparation: Install the top bearing sleeve (1) (pre-assembled on track-rail (2)), and floor pivot (3) or floor spring (BTS) as per instructions.

b) Slide bottom pivot sleeve (A) over bottom pivot rod (3) to full limit of travel. In so doing, ensure that the slot engages with the set screws. Secure using the set screws (4 mm Allan key).

c) Slide top pivot sleeve (B) over top pivot rod. Ensure compliance with the correct mounting position: the flattened side of the sleeve and the threaded bores for the single-point fixings face the glass.

d) Calculate the intermediate tube length = height of glass panel -575 mm.

e) Bolt pivot rods (4) with intermediate tube (5) and bottom pivot sleeve onto the glass panel.

f) Place the pivoting door panel with bottom spigot in the floor pivot bearing or floor spring (BTS).

g) Slide the top pivot sleeve up in accordance with diagram (B) and secure with set screws (4 mm Allan key).

h) Alignment:

Adjusting the door height: Via floor spring +4 mm (see floor spring fixing instructions;

4 adjustment screws).

Further door height adjustments possible using plastic shims between spindle section and pivot rod – removal of door panel necessary; ensure compliance with top door clearance!

Zero position: Via floor spring

Bottom side clearance: Via floor spring

Top side clearance: Via centering single-point fixings at the top pivot rod (2 mm)

Height of glass panel Intermediate tube length = Glass panel height -575 mm ① ④ ⑤ ④

Fig. 4a

Technical diagram showing a door lock mechanism with labeled parts and directional arrows indicating movement or assembly.

A

Technical diagram of a mechanical assembly with labeled parts and directional arrows indicating movement or assembly.

Fig. 4b
B

5. Roller replacement (Fig. 5):

The maintenance end piece (b) can be removed for the replacement of defective rollers. The guide plate must always be attached.

100 b Fig. 5

6. Track roller arrangement:

The arrangement of the track rollers is of decisive importance at the stacking area entry point.

A Roller for straight-through section = high track rollers (a), external

B Roller for diversion to internal stacking area track = high track rollers (a), internal, on the side of the stacking area

A B Fig. 6

7. Threading the panels onto the track (Fig. 7):

Thread the panels with mounted rollers onto the track using the opening provided by detaching the maintenance end piece.

Height adjustment:

Loosen nut (b) (17 mm Allan key) and adjust the height via nut (a) (17 mm Allan key). Counter-clockwise rotation = height increases; clockwise rotation = height decreases.

Technical diagram of a mechanical device with labeled components and connection points

Fig. 7

8. Lateral alignment of the panels

Align the pivoting end panel DE to provide an 8 mm clearance from the wall. Slide the last panel SF to its end position and align to provide a 3 mm clearance from the wall. The clearance between the panels should be 5 mm in each case.

DE 1 SF 2 SF 3 FT 4 8 5 5 5 4 Glass panel height Total height 7 1/1 FT = fixed panel SF = sliding panel DE = pivoting door panel Fig. 8

9. Installing the eccentric sockets (Fig. 9):

The standard system uses eccentric sockets for bottom locking. Mark the requisite positions of the eccentric sockets plumb below the lock bolts.

(Offset: Glass centre line to centre line of eccentric socket = 43.5 mm)

Version a) Drill holes 25 mm dia., 30 mm deep for eccentric sockets, and 8 mm dia. for anchor plugs. Insert eccentric sockets (double eccentric), align and fix with central screw in anchor plug.

Version b) Mount eccentric sockets in continuous recessed channel (provided by others).

Inside Face-mounted bolt in engaged position 7 Ø25 min. 30 DKFF min. Ø8 43,5 ±2,5 Version a) Version b) 30 25 Fig. 9

10. System maintenance and panel operation

In order to ensure functional reliability over the long term, please comply with the following instructions:

  1. Ensure that locks and bolts are kept in good working order.

  2. Regularly clean keeps for locks and bolts located in the floor.

Sliding the panels:

When closing the sliding partition, always lock each panel in position before moving the next one along.

The panels are very easy to move and should not require any force.

Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : Dormakaba

Model : HSW-GP

Category : Door