WBS1800 I4HR - Food Warmer BARTSCHER - Free user manual and instructions
Find the device manual for free WBS1800 I4HR BARTSCHER in PDF.
| Product Type | Plate Warmer |
| Brand | Bartscher |
| Model | WBS1800 I4HR |
| Supply Voltage | 220-240 V |
| Frequency | 50-60 Hz |
| Maximum Power Consumption | 800 W |
| Maximum Current Consumption | 3,5 A |
| Power Cable | H05RN-F 3x1,5 mm² |
| Number of Heating Elements | 4 (infrared) |
| Heating Type | Infrared radiation |
| Usage | Keeping food warm |
| Housing Material | Stainless Steel |
| Approximate Width | 1800 mm |
| Protection | Grounding mandatory |
| Maintenance | Clean with hot water and neutral detergent |
| Safety | Unplug before cleaning; stop via switch |
| Standards | Complies with applicable safety standards |
Frequently Asked Questions - WBS1800 I4HR BARTSCHER
User questions about WBS1800 I4HR BARTSCHER
0 question about this device. Answer the ones you know or ask your own.
Ask a new question about this device
Download the instructions for your Food Warmer in PDF format for free! Find your manual WBS1800 I4HR - BARTSCHER and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. WBS1800 I4HR by BARTSCHER.
USER MANUAL WBS1800 I4HR BARTSCHER
2
2
SCHEMA2ELETTRICO2
WIRING2DIAGRAM2
SCHALTPLAN2
CABLAGE2
2

- PRE7ESSE
- %ATI TE+NI+I
- INSTALLAZI9NE E 7ESSA IN SERVIZI9
- N9R7E GENERALI
- UTILIZZ9 %ELL'APPARE++HIATURA
- S7ALTI7ENT9
1.2222PREMESSE2
This section shows the symbols and provides information about the model of the appliance, the various responsibilities and the copyright. It concerns heated middle shelf.
For further information refer to paragraph "Technical data" (2).
DATA2PLATE2

Power supply frequency 7ax. power input
The data plate shows the identification and technical data of the product.
The data plate is inside the appliance on the right upper part of the heating panel.

WARNING!
%o not remove, tamper with or erase the "+E" mark of the appliance.
Refer to the data on the "+E" plate of the appliance in all communication with the 7 manufacturer (for example: when asking for spare parts, etc..)
The “+E” plate has to be destroyed while scraping the appliance..
The present handbook is intended solely for consultation by the operator. Its content could be modified without notice. The 7 manufacturer reserves the right to stop the manufacturing of any model and/or introducing product changes but is not obliged to change products delivered before the modification and declines all responsibilities for any inaccuracy may appear on this handbook related to printing or translation mistakes.
The company cannot assume liability for damage and faulty operation due to:
• Failure to obey the instructions of this handbook;
• 7odification or appliance alteration;
• 7aintenance by unspecialized technicians ;
• Insufficient maintenance;
- Improper use of the appliance;
• Exceptional and unforeseeable events;
• Unrespect to domestic legislation on health, hygiene and safety at the workplace;
• The employer is responsible for the periodic training of the operators about the correct use, safety rules and fire prevention.
2.
TECHNICAL DATA
RANGE OF HEATED MIDDLE SHELVES
2L
3L
4L
Supply voltage
Max. current requirement
A 1,8
2,6
3,5
Power cord
Mmq-H05RN-F
3×1,5
3×1,5
3×1,5
Max. supply Voltage variation
+/- 10%
+/- 10%
+/- 10%
Max. Frequency variation
continuous
+/-1%
+/-1%
+/-1%
Max. Frequency variation
Short period
+/- 2%
+/- 2%
+/- 2%

WARNING!
The electric power system and the rooms where the appliance is placed have to respect domestic legislation on safety, accident prevention and fire regulations. On the contrary the Manufacturer won't assume liability for direct and indirect damages to people or things.

3.
INSTALLATION AND COMMISSIONING

WARNING!
Intervention on the electric power system must be solely performed by specialized electricians.
Proceed according to the following instruction before connecting the appliance:
Remove the packaging and then the protective film taking care not to scratch the surface;
Make sure the power supply of the appliance shown on the data plate is compatible with the grid voltage;
➢ Check the power supply of the system is set up and able to take the current load, and meets the legal requirements and domestic standards;
The appliance must be earthed;
Plug the appliance. In case of direct connection to the electricity grid (without plug), it's necessary providing for a wall switch, which grants the complete disconnection according to overvoltage III rate and accordingly to installation rules;
Have the system tested by a qualified electrician, if operation of the equipotential earth connection or the safety of the electrical system is in doubt, the symbol below identifies the equipotential connection:

The Manufacturer declines all responsibilities in case of connection made by the user or unspecialized staff

WARNING!
After installation dispose of the packaging according to current regulations.
This appliance is designed and optimized to ensure high performance and efficiency. The sole use of this appliance is keeping food heated.

WARNING!
+ontact with hot tableware can cause burns.
Use always suitable safety equipment while handling objects.f
4. MAIN RULES
The Manufacturer does not assume responsibility for faults or damage due to tampering the appliance. This appliance must be used by skilled persons that must be periodically trained for its correct use and according to the safety regulations and prevention of accidents. +contact with hot tableware in the appliance can cause health risks. In order to prevent them use safety equipment and act with suitable caution.
f

WARNING!
Intervention on the electric power system must be solely performed by specialized electricians.f
5. USE OF THE APPLIANCE

Press the main switch on the supply panel that powers the appliance.
Switch on the button "A" to position "I". When the button "A" is switched on, it is lighted up and the appliance is under power and starts operating.
To stop heating turn the switch to "9" position. The heating is so disconnected but the appliance is under power.
Avoid amassing plates and place them under the lights.
Switch off finally the main power supply line ahead of the appliance or plug the appliance off.
9only when the appliance is disconnected, clean the stainless steel surfaces with warm water and a neutral soap, rinse thoroughly and dry carefully. In case of long period of inactivity, store the appliance in a dry place.
6. DISPOSAL AND RECYCLING

%ispose of the appliance responsibly and respect the environment at the end of its useful life. Proceed with its disposal in accordance with domestic regulation.