CR25U40001 - Inverter CyberPower - Free user manual and instructions
Find the device manual for free CR25U40001 CyberPower in PDF.
User questions about CR25U40001 CyberPower
0 question about this device. Answer the ones you know or ask your own.
Ask a new question about this device
Download the instructions for your Inverter in PDF format for free! Find your manual CR25U40001 - CyberPower and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. CR25U40001 by CyberPower.
USER MANUAL CR25U40001 CyberPower
4-Post Open Frame Rack4-Post Op

natural_image
Technical line drawing of a rectangular metal frame structure with mounting holes and internal ribs (no text or symbols)Table of Contents
Parts List 1
Rack Assembly 2
Accessory Installation 4
Leveling Feet 4
Cable Management Rings 4
Grounding Cable 5
Parts List
| No. | Part | Qty |
| Rack Components | ||
| 1 | Left Vertical Rail | 2 |
| 2 | Right Vertical Rail | 2 |
| 3 | Base Bracket | 2 |
| 4 | Corner Section | 8 |
| 5 | Center Section | 4 |
| 6 | Top Bracket | 2 |
| Rack Assembly Hardware | ||
| 7 | M8 Bolt | 48 |
| 8 | M8 Washer | 48 |
| Rack Assembly Tool | ||
| 9 | M8 (13mm) Wrench | 1 |
| 10 | Phillips Screwdriver | 1 |
| Equipment Mounting Hardware | ||
| 11 | M6 Cage Nut | 50 |
| 12 | PVC Cup Washer | 50 |
| 13 | M6 Phillips-Head Screw | 50 |
| Other Hardware and Accessories | ||
| 14 | Cable Management Rings | QtyVaries |
| 15 | Ring Mounting Screw | QtyVaries |
| 16 | Grounding Wires | 2 |
| 17 | M6 Phillips-Head Screw | 4 |
| 18 | Toothed Lock Washer | 4 |
| 19 | Leveling Feet | 4 |

text_image
Technical diagram of a structural frame assembly with numbered components for identification.
text_image
⑦8910 ⑪1213 ⑮ ⑯ ⑰ ⑱ ⑲ ⑳ ㉑ ㉒ ㉓ ㉔ ㉕ ㉖ ㉗ ㉘ ㉙ ㉚ ㉛ ㉜ ㉝ ㉞ ㉟ ㉳ ㉴ ㉵ ㉶ ㉷ ㉸ ㉹Rack Assembly
Please check packaging contents before starting to assemble.
- Assemble the top and bottom beams (4-total) as shown below. Refer to the table below to identify the desired mounting depth (22" to 40" available) and assemble corner and center sections at the corresponding index numbers on each side. For example, for a 33 inch depth, bolt one corner section to index #5 and the other corner section to index #6 onto the center section.

text_image
④ ⑤ 9 8 7 6 5 4 3 2 1 0 0 1 2 3 4 5 Index Numbers ④ ⑧ ⑦| Mounting Depth | Index Numbers |
| 22 in. | 0 and 0 |
| 23 in. | 1 and 0 |
| 24 in. | 1 and 1 |
| 25 in. | 1 and 2 |
| 26 in. | 2 and 2 |
| 27 in. | 2 and 3 |
| 28 in. | 3 and 3 |
| 29 in. | 3 and 4 |
| 30 in. | 4 and 4 |
| 31 in. | 4 and 5 |
| 32 in. | 5 and 5 |
| 33 in. | 5 and 6 |
| 34 in. | 6 and 6 |
| 35 in. | 6 and 7 |
| 36 in. | 7 and 7 |
| 37 in. | 7 and 8 |
| 38 in. | 8 and 8 |
| 39 in. | 8 and 9 |
| 40 in. | 9 and 9 |
- Using two of the beams assembled in step 1, line up one left and one right vertical rails, followed by a base and top bracket and bolt together using M8 bolts with washers as shown below.
NOTE: To facilitate final assembly, it is recommended to hand-tighten the bolts first. After all parts have been bolted together then tighten them firmly.

text_image
Assembled beam 1 2 3 4 5 6 7 8 Assembled beam- Using the remaining two beams assembled in step 1, line up the other set of left and right vertical rails and fasten them to the base and top brackets as shown below.

text_image
Assembled beam 1 2 7 8 Assembled beamAccessory Installation (Optional)
Leveling Feet
Bolt the included leveling feet (4pcs) to the bottom of the base bracket as shown below.
NOTE: Optional caster kit shown is available. Please contact your sales representative for ordering information.

natural_image
Technical line drawing of a mechanical assembly with bolts and components (no text or symbols)Cable Management Rings
Screw the included cable management rings onto the assembled rack as shown below.

text_image
Technical diagram showing a mechanical assembly with labeled parts 14 and 15, including a close-up detail of a component.Grounding Cable
To tie the assembled rack to the facility's ground, use the grounding wire with the included M6 screw and toothed lock washer. Screw the grounding wire to the pre-installed rivet nut on the inside of the base bracket as shown below.

text_image
Technical diagram of a server rack with labeled components including connectors and portsCyberPower®
CyberPower Systems, Inc.
www.cyberpower.com
For USA and Canada:
4241 12th Ave East, Suite 400
Shakopee, MN 55379
Toll-free: (877) 297-6937
For all other regions:
Please visit our website for local contact information.