Real Flame

Pure Vision 3300 - Heating Real Flame - Free user manual and instructions

Find the device manual for free Pure Vision 3300 Real Flame in PDF.

📄 31 pages English EN Download 💬 AI Question
Notice Real Flame Pure Vision 3300 - page 1
Pick your language and provide your email: we'll send you a specifically translated version.

User questions about Pure Vision 3300 Real Flame

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Heating in PDF format for free! Find your manual Pure Vision 3300 - Real Flame and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. Pure Vision 3300 by Real Flame.

USER MANUAL Pure Vision 3300 Real Flame

natural_image Technical line drawing of a mechanical housing or enclosure with internal components (no text or symbols)

Pure Vision fire boxes are approved to be installed as a zero clearance firebox and are designed to operate on Natural Gas and Pipeline (LPG)

gases ONLY.

Approval Number: GMK10099

Installed primarily as a decorative appliance. Not certified as a Space Heater.

VERSION 9.5

WARRANTY INFORMATION

The benefits provided to you under the following warranty are in addition to any other rights and remedies available to you under the law.

1. Warranty

If:

(a) during the first 15 years from the date of purchase (Firebox Warranty Period), there is a defect in the firebox of the Gas Burner; or
(b) during the first 2 years from the date of purchase (Parts Warranty Period), there is a defect in the gas valves or other parts of the Gas Burner,

due to improper workmanship or material, Glen Dimplex will replace or repair the Gas Burner without charge. Any replacement product is warranted only for the time remaining on the original Firebox Warranty Period or the Parts Warranty Period as relevant.

2. Registration

You must register to receive the benefit of this warranty by completing the warranty registration on our website (www.realflame.com.au) or completing and mailing the attached registration card within 30 days of purchase of your Gas Burner (or, if the Gas Burner is fitted to a new home, within 30 days of the date of settlement of purchase of such new home).

3. Exclusions

Glen Dimplex is not obliged to replace or repair the Gas Burner under clause 1 if:

(a) it has been improperly stored, installed, connected, used, operated or repaired, or damaged, abused, tampered with, altered (without our written approval), or not maintained in strict accordance with our installation and operating instructions; or

(b) it has been installed in an outdoor setting.

4. Limit of Liability

The warranty provided under this warranty is limited to replacement or repair of the Gas Burner only, at our option. To the extent permitted by law, Glen Dimplex excludes liability for consequential loss or any other loss or damage caused to property or persons arising from any cause whatsoever, and damage arising from normal wear and tear.

5. Claiming under the Warranty

In order to claim under this warranty you must, within the Firebox Warranty Period or the Parts Warranty Period (as relevant), contact Glen Dimplex, providing the original proof of purchase and the details below:

Supplier Name

Date Of Purchase / settlement of property if new home ____

Model / Serial Number

This warranty does not cover the cost of claiming under the warranty or transporting the Real Flame Gas Burner to and from the supplier.

Our goods come with guarantees that cannot be excluded under the Australian Consumer Law. You are entitled to a replacement or refund for a major failure and for compensation for any other reasonably foreseeable loss or damage. You are also entitled to have the goods repaired or replaced if the goods fail to be of acceptable quality and the failure does not amount to a major failure.

If you would like to speak to someone about your Gas Burner or claiming under this warranty, please contact the Service Warranty Desk on 1300 554 155.

Glen Dimplex Australia Pty Ltd ACN 69 118 275 460

Head Office: 8340k€/m².15000000000000000000000000000000000000000000

Telephone: (03) 8706 2000 Facsimile: (03) 876 2001

INSTALLATION NOTICE

The installation of this appliance is only to be carried out by an authorised person in accordance with the Manufacturer's Instructions, local gas fitting regulations, AS/NZS 5601.1-2013 installation code for gas burning appliances and any other relevant statutory regulations.
In all cases the installation of this appliance shall meet the requirements as set out in AS/NZS 5601.0423.

NOTE: A slight smell may be apparent for the first few hours of use. This is due to the heat resistant paint curing. It is recommended to open windows in the room for the first lighting of the fire. In some instances a slight discolouration may occur inside the firebox. This is a normal condition and is not covered by warranty.

IMPORTANT SAFETY NOTICES

■ DO NOT PLACE ARTICLES ON OR AGAINST THIS APPLIANCE.
■ DO NOT USE OR STORE FLAMMABLE MATERIAL NEAR THE APPLIANCE.
■ DO NOT SPRAY AEROSOLS IN THE VICINITY OF THIS APPLIANCE WHILST IT IS IN OPERATION.
CARE MUST BE TAKEN TO ENSURE THAT ANY RETURN AIR REGISTER OR EXHAUST SYSTEM DOES NOT ADVERSLEY AFFECT THE OPERATION OF THE APPLIANCE OR DRAUGHT OF CHIMNEY OR FLUE.
■ DO NOT MODIFY THIS APPLIANCE.
THIS APPLIANCE IS DESIGNED TO OPERATE WITH LUMINOUS FLAMES. THIS MAY EXHIBIT SLIGHT CARBON DEPOSITS.

WARNING

This firebox has a naked flame, care should be taken when it is operating if children or the infirm are in close proximity. A safety screen is recommended if constant supervision is not possible. It is recommended that a secondary guard complying with AS-NZS2286 be installed.

The appliance is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concerning use of the appliance by a person responsible for their safety. Children should be supervised to ensure that they do not play with the appliance.

SERVICING

It is recommended you service your gas fire every 2 years as a minimum.

VENTHATION REQUIREMENTS

MODELSIZEEFFECTIVE VENTILATION
PURE VISION1000 50,000mm^2
PURE VISION1500 72,000mm^2
PURE VISION1800 72,000mm^2
PURE VISION3300 144,000mm^2

THIS APPLIANCE REQUIRES FRESH AIR TO OPERATE SAFELY. THE ROOM WHERE THIS APPLIANCE IS INSTALLED MUST HAVE PERMANENT VENTILATION FROM OUTDOORS. THIS VENTILATION MUST NOT BE MODIFIED.

CONTENTS

Contents 4

Data Plate 5

Dimensions Pure Vision 1000....7

Dimensions Pure Vision 1500....8

Dimensions Pure Vision 1800....9

Dimensions Pure Vision 3300....10

Zero Clearance Modular Installation

Timber Frame Installation....11

Installation Check List....12

Lighting/Testing and Failure Procedure 13

Flue Requirements (Standard) 14

Flue Requirements (Power Flue Kit).... 15

Optional Power Flue 16

Introduction....16

Installation 16

Commissioning....19

Motor Clearance....20

Frameout 21

Motor 21

Internal Motor 22

External Motor 22

Dimensions.... 23

Troubleshooting Electronic Ignition and Power Flue System 25

Wiring Diagram.... 27

Parts 28

Bases & Fronts 29

Real Flame contact information 31

DATA PLATE (Affixed to the base of the unit for reference to gas pressure & consumption)

Purevision 1000 & Purevision Signature 1000

Fitted with Magiglo 750 or 750EI burner

GasInjector Size (mm)TPPN.G.C. (Mj/Hr)
Natural Gas3 x 1.900.75 kPa39
ULPG3 x 0.952.55 kPa34

Purevision 1500 & Purevision Signature 1500

Fitted with 1000 or 1000EI burner

GasInjector Size (mm)TPPN.G.C. (Mj/Hr)
Natural Gas3 x 2.250.75 kPa49
ULPG3 x 1.122.60 kPa49

Fitted with 1200 burner

GasInjector Size (mm)TPPN.G.C. (Mj/Hr)
Natural Gas4 x 2.200.80 kPa55
ULPG4 x 0.952.55 kPa48

Purevision 1800 & Purevision Signature 1800

Fitted with 1400 or 1400EI burner

GasInjector Size (mm)TPPN.G.C. (Mj/Hr)
Natural Gas4 x 2.250.85 kPa60
ULPG4 x 0.952.55 kPa48

ZERO CLEARANCE MODULAR INSTALLATION

  • The Firebox is designed to be installed into a new frame out as shown on page 12.
  • The fire can be installed at ground level or raised to what ever height is required providing the flue length is 2.7 meters or more.
    • The firebox can sit directly onto a wooden surface.
  • The Firebox requires twin skin flue with an AGA approved cowl (or optional Power Flue – refer pages 16 to 28)
  • The control valve on the Firebox is an electronic ignition system and as such, electrical work is required.

Overall Dimensions (in mm)

MODEL ABCDE
850
10009201100450570155
150010001600450500190
180011401900450500190
330011353400450500190

Real Flame Pure Vision 3300 - ZERO CLEARANCE MODULAR INSTALLATION - 1

text_image B E D A C

Real Flame Pure Vision 3300 - ZERO CLEARANCE MODULAR INSTALLATION - 2

text_image REAR OF FIREBOX 12mm Gas Line Inlet Point 125φ 90φ Connection to Power Flue or electronic ignition (Optional) 130φ 100φ 70φ 90φ Power Lead (Optional)

Flue Sizes (in mm)

MODEL Size Inner Outer
PURE VISION 1000 250 300
PURE VISION 1500 300 350
PURE VISION 1800 300 350
PURE VISION 3300 300 x2 350 x2
POWER FLUE (optional) Refer pages 16-28

THIS APPLIANCE REQUIRES FRESH AIR TO OPERATE SAFELY. THE ROOM WHERE THIS APPLIANCE IS INSTALLED MUST HAVE PERMANENT VENTILATION FROM OUTDOORS, IN ACCORDANCE WITH THE VENTILATION REQUIREMENTS OF AS/NZS 5601.

DIMENSIONS

Pure Vision 1000

Real Flame Pure Vision 3300 - Pure Vision 1000 - 1

text_image PLAN F C E +
ABCDEFGH
9201100450570185335230150
IJKLMNO
40012050--520350

Real Flame Pure Vision 3300 - Pure Vision 1000 - 2

text_image LHS 396 mm N M 430mm FRONT O H A D J K B

Real Flame Pure Vision 3300 - Pure Vision 1000 - 3

text_image RHS G

Real Flame Pure Vision 3300 - Pure Vision 1000 - 4

text_image REAR 87 125 70 100 130 87

DIMENSIONS

Pure Vision 1500

ABCDEFGH
10001600450500190370215300
IJKLMNO
33012050-50450500

PLAN
Real Flame Pure Vision 3300 - Pure Vision 1500 - 1

text_image C F E +

LHS
Real Flame Pure Vision 3300 - Pure Vision 1500 - 2

text_image R 3.28 mm R 4.30mm

FRONT
Real Flame Pure Vision 3300 - Pure Vision 1500 - 3

text_image O H A I D J K B

RHS
Real Flame Pure Vision 3300 - Pure Vision 1500 - 4

natural_image Pure geometric diagram of a mechanical part with dimension label 'c' (no text or symbols beyond the label)

REAR
Real Flame Pure Vision 3300 - Pure Vision 1500 - 5

text_image 150 125 70 87 100 130

DIMENSIONS

Pure Vision 1800

ABCDEFGH
11351900450500190370215435
IJKLMNO
33012050--450635

PLAN
Real Flame Pure Vision 3300 - Pure Vision 1800 - 1

text_image P C E +

FRONT

Real Flame Pure Vision 3300 - Pure Vision 1800 - 2

text_image N M 430mm 328mm

Real Flame Pure Vision 3300 - Pure Vision 1800 - 3

text_image O H A I D J K B

RHSLHS
Real Flame Pure Vision 3300 - Pure Vision 1800 - 4

natural_image Pure geometric diagram of a rectangular shape with a labeled dimension 'c' (no text or symbols beyond the label)

REAR
Real Flame Pure Vision 3300 - Pure Vision 1800 - 5

text_image 87 125 70 87 100 130

DIMENSIONS

Pure Vision 3300

ABCDEFGH
11353400450500190370215435
IJKLMNO
33012050--450635

Real Flame Pure Vision 3300 - Pure Vision 3300 - 1

ZERO CLEARANCE MODULAR INSTALLATION

Timber Frame Installation

Real Flame Pure Vision 3300 - Timber Frame Installation - 1

text_image D (Recommended only) Frameout MODEL A PURE VISI PURE VISI PURE VISI PURE VISI PURE VISI A B C

Frameout Dimensions (in mm)

MODEL A B C D
PURE VISION 850
PURE VISION 1000 1020 1150 475 2100
PURE VISION 1500 1100 1650 475 2100
PURE VISION 1800 1235 1950 475 3000
PURE VISION 3300 1235 3450 475 3600

NOTE: All Modular fires and flue kits are to be installed PRIOR to plasterboard. Plasterboard is to be run past stud frame and up to fire opening either terminating in square edge, or for Simplicity and Elegance a 3 or 4 sided trim finish.

CLEARANCES FROM COMBUSTIBLES

Floor 0 mm
Sides 25 mm
Top 100 mm
Flue Outer 25 mm

ZERO CLEARANCE MODULAR INSTALLATION

Installation Procedure

TICK BOXES

☐ Check frame out has been constructed correctly and has not been plastered.

☐ Check frame out and structure above is clear of any structures that may impede the flue run. If the flue needs to be off set with 45 deg bends, the offset length can be no more than 20% of the total flue run. It is recommended that after the last bend at least two full lengths of flue are added in the vertical.

☐ Ensure an adequately sized gas connection is available within the frame out, a 15mm gas copper pipe is to be provided into the firebox. An access hole is provided in the back of the firebox. A 500mm tail is required into the firebox to allow for connection to the burner.

☐ Position the unit ensuring the wiring loom and gas pipe are accessible.

☐ Connect the twin skin flue (or Optional Power Flue if supplied).

☐ Install an AGA approved gas cowl ensuring the termination meets all relevant code requirements.

☐ Connect the gas line to the burner connection using the 15mm flared copper union (supplied).

☐ Connect the wiring terminals to the ignition pack as shown below. Note: Do not locate the switch further than 6 meters from the firebox.

Place the burner surround or optional front or marble base over the burner.

Place the coals or optional pebbles randomly on the ceramic blanket. If coals and logs option is supplied, place logs on top of coals randomly.

IMPORTANT! Only ceramics supplied by Glen Dimplex Australia are to be used.

Real Flame Pure Vision 3300 - TICK BOXES - 1

natural_image Technical line drawing of a mechanical device with internal components and mounting holes (no text or symbols)

DO NOT BLOCK INTAKES ON INSTALL

Real Flame Pure Vision 3300 - TICK BOXES - 2

text_image DO NOT BLOCK

INTAKES ON INSTALL

LIGHTING MAIN BURNER

FOR YOUR SAFETY READ BEFORE LIGHTING

■ Before igniting the fire, check for gas leaks.
■ Use only the ignition components supplied.
- Do not use this appliance if any part has been under water. Immediately call a qualified service technician to inspect the appliance and replace any part of the control system and any gas control that has been under water.

LIGHTING INSTRUCTIONS

  1. STOP! Read the safety information before proceeding.
  2. Turn on the remote wall switch.

- If the fire will not stay lit after several tries turn the switch to "OFF" and call your service technician or gas supplier.

TO TURN OFF GAS TO APPLIANCE

  1. Turn off the remote wall switch.

TESTS TO BE CARRIED OUT BY INSTALLER

  1. Carry out a smoke test to ensure the fireplace is drawing.
  2. Test that the Test Point Pressures are correctly set.
  3. Check that there are no gas leaks form any of the fittings.
  4. Explain to the customer how the unit operates and how to turn it on and off.

FAILURE PROCEDURE

If when the wall switch is turned to the “ON” position and the fire fails to ignite, check the following:

  1. Ensure that the wiring terminals are not loose.
  2. Test that the inlet and working pressures are both correct.

FLUE REQUIREMENTS

Natural Draught

The standard natural draught flue kit consists of 4 x 900mm lengths of twin skin flue (refer to page 5 for correct sizing) and an AGA approved cowl.

Real Flame Pure Vision 3300 - Natural Draught - 1

text_image 3.6m Flue Kit complete with cowl 500mm Min. 3.6m twin skin flued Firebox 200mm 200mm 2 lengths above last bend Max. 20% of total flue run

These notes must be read in conjunction with AGA code 601.
Real Flame Pure Vision 3300 - Natural Draught - 2

text_image 500mm Min. 3.6m Min.

A minimum of 3.6m flue is required to protrude 500mm above roof line.

Flue can be offset with two 45° bends no more than 20% of overall height of flue.

CLEARANCES

Floor 0 mm
Sides 25 mm
Back 25 mm
Top 100 mm
Flue Outer 25 mm

FLUE REQUIREMENTS

Power Flue Kit (Optional - refer to pages 16 to 28 for details)

The standard Power Flue Kit consists of ;

  • 1 x Power Flue Fan
  • 1 x Power Flue Motor
  • 1 x Control Module
    • 1 x Electronic Ignition Pack
  • 1 x Baffle
    • 1 x Pressure Differential Switch
  • 1 x Loom
  • 1 x Termination Cowl (horizontal or vertical)

Real Flame Pure Vision 3300 - Power Flue Kit (Optional - refer to pages 16 to 28 for details) - 1

text_image Electrical Wiring between Fan / Unit / Kit Twin Skin Flue 150mm/200mm or 200mm/250mm Fan Casing / Kit Twin Skin Flue 150mm /200mm or 200mm/250mm Optional for additional height if required Baffled Flue / Kit

A 'flue' using a fan to remove or assist in removing combustion products from an appliance, is known as a 'power flue'.

A power flue application can be used to enable a client to have a decorative fire with a horizontal flue run or a vertical flue run where flue space is inadequate for the normal flue.

WHERE FITTED A POWERFLUE SYSTEM MUST BE DESIGNED AND INSTALLED TO MEET GAS INSTALLATION CODES AS5601.1.2013 CLAUSE H2 - POWER FLUE DESIGN.

Where the powerflue option described in this manual is installed, it represents a Power Flue installed in accordance with AS/NZS 5601.1 Paragraph H2. The powerflue system when installed to the instructions is designed to comply with the requirements of AS/NZS5601.

The powerflue must be installed and commissioned by the installer in accordance with Paragraph H2.2.7 AS/NZS 5601.1.

INSTALLATION INSTRUCTIONS

VENTILATION REQUIREMENTS

A requirement of the gas installation code AS/NZS5601.1-2013 is that ventilation is required as per the manufacturers instructions. Clause 6.10.9.5 of AS/NZS5601.1-2013 sets out the ventilation requirements.

Ventilation requirements of models installed with Power Flue

MODELSVentilation Sq mm
Double Vision, Hot Box and all Heatseekers18,000
Pure Vision, Simplicity, Elegance, Signature, Hybrid 1000 & 1500 Sizes18,000
Pure Vision, Simplicity, Elegance, Signature, Hybrid 1800 Sizes32,000
Pure Vision, Simplicity, Elegance, Signature, Hybrid 3300 Size64,000

ACCESS TO POWER FLUE MOTOR

Access must be provided to the flue motor, this access MUST be at least 400mm x 400mm. There MUST be a minimum clearance of 250mm between the top of the motor and any fixed object i.e. ceiling or stud work. This is so the top of the fan box can be removed.

WIRING OF THE POWER FLUE

All wiring for the power flue is carried out at the factory and plug connectors are fitted for easy installation. The power supply for the power flue is via a 3-pin plug at the rear of the firebox that can be plugged into a power socket within the cavity.

ISOLATION SWITCH

If the power point is within a cavity an isolation switch accessible from outside the cavity must be provided.

WIRING CLEARANCES

Wiring must at all times have a clearance of at least 150mm from the flue.

FAN FAILURE SENSING DEVICE

All Real Flame Power Flue systems are fitted with a sensing device within the unit to ensure that, in the event of flow failure, the safety shut off valve within the module will go into lockout and shut off the gas supply to the unit. The device should ALWAYS be in the vertical position. Refer to the pressure differential switch on page 11.

'LOCKOUT'

'Lockout' is the term used when the module in the unit senses a fault. When a fault is detected by the module it will shut off the gas and go into lockout. If this occurs contact the manufacturer.

INSTALLATION INSTRUCTIONS (continued)

Listed below are the minimum clearances required for fan-assisted terminations:

  1. Below eaves, balconies and other projections. 200mm
    1a. Below eaves, balconies and other projections for a 1500 & 1800 model ....300mm
  2. From the ground, above a balcony or other surface....300mm
  3. From a return wall or external corner....300mm
  4. From a G as meter....1000mm
  5. From an electricity meter or fuse box. 500mm
  6. From a drainpipe or soil pipe....75mm
  7. Horizontally from any building structure or obstruction facing a terminal. ....500mm
  8. From any other flue terminal. Cowl, or combustion air intake. 300mm
  9. Horizontally from any openable window, door, non-mechanical air inlet, or any other opening into a building with the exception of sub floor ventilation.....300mm
  10. From a mechanical air inlet including a spa blower....1000mm
  11. Vertically below an openable window, non-mechanical air inlet, or any other opening into a building with the exception sub floor ventilation.....500mm

ELECTRICAL

SHOULD THE SUPPLY FLEX AT THE BACK OF THE FIREBOX BE DAMAGED, A SPECIALLY PREPARED FLEX IS REQUIRED. FOR REPLACEMENT CONTACT THE MANUFACTURER.

THE ON/OFF WALL SWITCH MUST NEVER BE ATTACHED TO A METAL FRAME.

WARNING

Whenever servicing the power flue system, always turn off the electrical power supply and close the manual gas control valve.

IMPORTANT INFORMATION

In addition to the instructions in this manual all national, state and local regulations must be adhered to. These include but are not limited to:

• Australian Standards AS3000 - Electrical Installation.
• Australian Standards AS/NZS5601.1-2013 - Gas Installation.
- Local Gas and Electrical Authority Regulations.
• Municipal Building Codes.

The power flue should be serviced every 12 months by an authorised technician. If repairs are needed an authorised technician must carry them out.

FITTING THE MOTOR

The Power Flue motor is fitted with two sets of spigots. The set on the base of the Power Flue box sit on top of the vertical flue and the set mounted on the side plate connect to the horizontal flue.

The 1800 and 3300 units have a power flue motor with a 200mm spigot and a twin spigot of 200mm and 250mm.

INSTALLATION INSTRUCTIONS (continued)

FLUE SIZE

The flue size for each model is different. Please refer to the table below.

MODELS A mm B mm
Double Vision, Hot Box and all Heatseekers 150 200
Pure Vision, Simplicity, Elegance, Signature, Hybrid 850, 1000 & 1500 Sizes 150 200
Pure Vision, Simplicity, Elegance, Signature, Hybrid 1800 & 3300 Sizes 200 250

NOTE: Ensure all power flue inner and outer flue lengths are sealed at joins.

HORIZONTAL FLUE RUN

The maximum length of horizontal flue run is to be 13.5 metres with a maximum of four (4) bends; these bends can be 45^ or 90^ . The horizontal flue run is to have a grade downwards from the motor to the termination.

VERTICAL FLUE RUN (see page 8)

The minimum vertical flue run is 900mm from the top of the firebox (1500mm from the floor). If a longer vertical run is required twin skin flue 150mm & 200mm can be added between the muffler top and the fan. The flue can be cut to the required height. For 1800 and 3300 units 200mm/250mm flue is required.

FLUE CLEARANCES

All flue clearances are as per the requirements listed in the heater specifications.

TERMINATION

The termination to be used for all horizontal installations is to be either a small flush cowl or if used as a service access panel, a large flush cowl is required. For vertical termination a vertical approved cowl must be used. An external motor can be used as an option on horizontal and vertical terminations.

INSTALLATION OF POWER FLUE KIT

POWER FLUE MUFFLER

The power flue muffler has a spigot at each end. The end that attaches to the firebox has a spigot equivalent to the inner flue spigot diameter of the firebox, the top of the muffler has a 150mm spigot which the motor fits to, or the 150/200 twin skin flue if required. The flow arrow on the muffler is to be pointing up. If a 1800 or 3300 unit is used the flue is 200mm/250mm.

WIRING (see wiring diagram page 28)

A 3 metre lead is supplied with the power flue, this lead has a different connection on each end, one end is plugged into the connection on the left hand side of the firebox and the other end is to be plugged into the fan. The wire coming from the rear of the firebox with the standard 3-pin plug attached is to be plugged into a power point. A single gang wall switch is also supplied attached to the 3 metres of lead; this wall switch is to be attached at a location accessible to the client. No other wiring is required.

SERVICING OF THE POWER FLUE MOTOR

The Real Flame Power Flue motor is designed so as to make servicing the motor a simple task. The power lead connected to the motor is to be disconnected (unplugged) and the screws are to be undone, the fan motor will then lift out for servicing. The fan Motor box connected to the flue does not have to be disconnected from the flue.

COMMISSIONING THE POWER FLUE SYSTEM

THE INSTALLER MUST COMMISSION THE POWERFLUE SYSTEM AS PER CLAUSE H2.2.7 (AS5601.1.2013)

The correct CO_2 concentration shall be established by adjustment of dampers and checked by flue gas analysis. A check that the controls are operating in the manner specified shall be carried out.

The check shall include a simulation of fan failure.

Commissioning the powerflue systed is an additional requirement to commissioning the appliance. The appliance must also be commissioned as per AS5601.1.2013.

Sizing of the fan

In order to select a suitable fan, it is necessary to determine the volume and temperature of the flue gases. Before this can be done the percentage of CO_2 in the flue gases shall be decided.

If discharge is at a low level, 1% CO_2 may be used in the design formula. For other situations, values between 4% and 8% may be used. These values will give flue gas temperatures of 140^ and 220^ respectively.

For appliances with modulating burners, the CO_2 concentration in the flue shall be considered when the appliance is operating at normal rate, i.e. 8% CO_2 in the combustion chamber.

The quantity of flue gases to be handled by the fan may be determined by the following simplified formula, which is sufficiently accurate for most flue gases currently distributed. A suitable fan may then be selected.

$$ Q = \frac {T}{R} $$

Where Q = volume of flue gases, litres per second

T = total gas consumption of appliances connected to flue megajoules per hour

R = desired % CO _2 concentration by volume in the flue gases at the discharge point

FLUE GASES - RELATIONSHIP BETWEEN % CO₂ VOLUME FLOW RATE & % EXCESS AIR

CO _2 % Volume Flow Rate L/s/MJ/h Excess Air %

10 0.10 33

9 0.11 50

8 0.13 67

7 0.14 90

6.7 0.15 100

6 0.17 120

5 0.20 170

4.4 0.23 200

4 0.25 230

3.3 0.30 300

3 0.33 400

2.2 0.45 500

2 0.50 500

1.7 0.60 700

1.2 0.80 1000

1.0 1.00 1200

0.8 1.20 1500

0.6 1.60 2000

0.5 2.00 2600

POWER FLUE MOTOR CLEARANCE

Real Flame Pure Vision 3300 - POWER FLUE MOTOR CLEARANCE - 1

text_image Minimum clearance 250mm Ensure there is adequate ventilation within this cavity to prevent motor over- heating. 150mm/200mm or 200mm/250mm twin skin flue - optional for additional height Baffle Height 980mm and diameter 350mm

TYPICAL POWER FLUE FRAMEOUT

Real Flame Pure Vision 3300 - TYPICAL POWER FLUE FRAMEOUT - 1

text_image IMPORTANT Install unit and fluing before plasterboard. Minimum clearance 250mm 400mm x 400mm Access Panel 90mm x 38mm ON EDGE Sound check plaster board Motor Pressure Differential Switch Motor Fan Casing

INTERNAL MOTOR
Real Flame Pure Vision 3300 - TYPICAL POWER FLUE FRAMEOUT - 2

text_image TERNAL MOTOR 250mm min. Access Panel 150mm x 200mm or 200/250mm flue extension 200mm or 300mm Flush Cowl termination Min. Distance Domestic: 220mm twin skin flue (if required) Baffle 900mm Heater 25mm Flue Minimum 25mm clearance from outer flue to combustible interior. 500mm Top Termination

NOTE:

  1. Maximum of 4 elbows, 45^ or 90^ .
  2. Allow 400mm x 400mm access panel for service of motor.

EXTERNAL MOTOR
Real Flame Pure Vision 3300 - NOTE: - 1

text_image MINAL MOTOR 25mm clearance 340mm 150mm x 200mm or 200/250mm flue extension 150mm x 200mm twin skin flue (if required) or 200/250mm Baffle 900mm Heater External Motor 200mm (or 300mm for 1500 & 1800 models

NOTE:

  1. Maximum of 4 elbows, 45^ or 90^ .

DIMENSIONS

External Flue Motor

Real Flame Pure Vision 3300 - External Flue Motor - 1

ABCDEFGH
30234834555/590/4020200/250150/200
IJKLMNOP
1320120601057545112
MODELSH mmG mm
Double Vision, Hot Box and all Heatseekers150200
Pure Vision, Simplicity, Elegance, Signature, Hybrid 850, 1000 & 1500 Sizes150200
Pure Vision, Simplicity, Elegance, Signature, Hybrid 1800 & 3300 Sizes200250

Power Flue Flush Termination 500 x 500

Real Flame Pure Vision 3300 - Power Flue Flush Termination 500 x 500 - 1

text_image FRONT 500 154

Real Flame Pure Vision 3300 - Power Flue Flush Termination 500 x 500 - 2

text_image REAR

Real Flame Pure Vision 3300 - Power Flue Flush Termination 500 x 500 - 3

text_image RHS 22 115 150/200 200/250

Power Flue Flush Termination 300 x 300

Real Flame Pure Vision 3300 - Power Flue Flush Termination 300 x 300 - 1

Real Flame Pure Vision 3300 - Power Flue Flush Termination 300 x 300 - 2

REAR
Real Flame Pure Vision 3300 - Power Flue Flush Termination 300 x 300 - 3

DIMENSIONS

Internal Power Flue Motor

Real Flame Pure Vision 3300 - Internal Power Flue Motor - 1

ABCDEFGH
268281331311202152300128

Internal Power Flue Motor 200/250

Real Flame Pure Vision 3300 - Internal Power Flue Motor 200/250 - 1

ABCDEFGH
268281322336252202336128

Real Flame Pure Vision 3300 - Internal Power Flue Motor 200/250 - 2

Real Flame Pure Vision 3300 - Internal Power Flue Motor 200/250 - 3

TROUBLE SHOOTING FOR ELECTRONIC IGNITION AND POWER FLUE SYSTEM.

SymptomPossible CauseCorrective Action
Fire turned on and nothing happensNo Power to ModuleConnect Power
Fire turned on and motor starts but there is no sparkPressure switch not operatingCheck pressure switch
Fire sparks when turned on but will not igniteA. No Gas Connect Gas.
B. Sparker is to far from metalAdjust sparker so it cross lights to metal.
C. Pressure switch (Power Flue) is not operating correctly.Remove fan from housing and check that small tube supplying air to pressure switch has not moved or been damaged.
C. Valve solenoids are faultyCheck solenoids
D. Solenoid wires to module not connected correctlyCheck that the four pin plug from the valve has been connected correctly
Fire ignites and then shuts down within a couple of secondsA. Something is touching the heat sensorEnsure that nothing is touching the sensor which is located behind the cover plate at front of burner.
B. The power polarity is reversedCheck polarity
Fire ignites and shuts down after several minutesA. Insufficient air for burner to operate correctlyCheck that the unit has correct ventilation as per Installation manual.
B. Pressure switch not operating correctlyCheck air supply tube to pressure switch.

TROUBLE SHOOTING FOR ELECTRONIC IGNITION AND POWER FLUE SYSTEM. (continued)

The power flue and electronic control box have a red LED light that indicates the possible cause of a problem, the LED light will flash in different sequences for different problems, the most common are:-

Long Flash Short Flash

10Normal Running State.
11Flame Failure.
12Waiting for pressure switch ON
13Waiting for pressure switch OFF
21Maximum retries exceeded

POWER FLUE WIRING DIAGRAM

Real Flame Pure Vision 3300 - POWER FLUE WIRING DIAGRAM - 1

text_image TECHRITE POWER FLUE CONTROL MODULE Sparker Heat Sensor LED Indicator Power Fan Pressure Switch Double Block Solenoid

NOTE

For C Bus and/or fresh air damper interlock systems, please contact us for wiring diagrams and relevant system instructions at info@celladim.pkm.com.au

Real Flame Pure Vision 3300 - NOTE - 1

natural_image Technical line drawing of a mechanical component with mounting holes and housing (no text or symbols)

White Rogers Valve Used For Electronic Ignition For 850 & 100 Modular Boxes.
Part Number: W0079

Real Flame Pure Vision 3300 - NOTE - 2

natural_image Technical line drawing of a mechanical component with mounting holes and internal gear (no text or symbols)

Dungs Valve used On 1400 Burner In 1800 Modular Box.
Part Number: DUBM 241221

Real Flame Pure Vision 3300 - NOTE - 3

natural_image Two identical wire-wrapped medical or electrical devices with no visible text or symbols

Sparker and Sensor Fitted to all Electronic Ignitions.
Part Number: GST0829985

Real Flame Pure Vision 3300 - NOTE - 4

text_image TECHRITE AUTOMATIC IGNITION SYSTEM

Techrite Electronic Ignition Module.
Part Number: TAIS00RISD5

Real Flame Pure Vision 3300 - NOTE - 5

text_image TECHRITE AUTOMATIC IGNITION SYSTEM

Techrite Power Flue Module used on all Power Flue Models.
Part Number: TAISCPRI5DS

Real Flame Pure Vision 3300 - NOTE - 6

natural_image Top-down schematic of a mechanical component with mounting holes and a central hexagonal nut (no text or symbols)

Regulator fitted to all Natural Gas 1400 Magiglo Burners.
Part Number: 2369

MARBLE BASES AND FRONTS

**NOTE: The bases used should be manufactured from a non-combustible material such as metal or natural stone. Reconstituted stone and other materials which may contain resins or combustible components should not be used. The base should not be stuck down under any circumstances as it is used for access to the burner and other components.

Real Flame Pure Vision 3300 - MARBLE BASES AND FRONTS - 1

text_image I# G A J# H B ** Base X C D X = Polished E Front Optional Hybrid F

Note: I & J are

versions of Simp where glass is f and one side is Hybrid means th left, and Right H glass is on the r

Note: I & J are for Hybrid versions of Simplicity/Purevision where glass is fitted to one side and one side is solid. Left Hand Hybrid means the glass is on the left, and Right Hand means the glass is on the right.

MODEL ABCDEFGHI# J#
PURE VISION 850
PURE VISION 100076543010302121701030132.5132.5130115
PURE VISION 1500121543015302321701530157.5157.5155140
PURE VISION 1800141543018302321701830207.5207.5205190

I & J are based on a Left Hand Hybrid. Reverse for Right Hand unit.

Real Flame Pure Vision 3300 - Note: I & J are for Hybrid versions of Simplicity/Purevision where glass is fitted to one side and one side is solid. Left Hand Hybrid means the glass is on the left, and Right Hand means the glass is on the right. - 1

text_image REAL FLAME

www.realflame.com.au

1300 554 155

Table of contents Click a title to access it
Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : Real Flame

Model : Pure Vision 3300

Category : Heating