APC

LIBSMG95OUL1PH - Inverter APC - Free user manual and instructions

Find the device manual for free LIBSMG95OUL1PH APC in PDF.

📄 107 pages English EN Download 💬 AI Question
Notice APC LIBSMG95OUL1PH - page 1
Pick your language and provide your email: we'll send you a specifically translated version.

User questions about LIBSMG95OUL1PH APC

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Inverter in PDF format for free! Find your manual LIBSMG95OUL1PH - APC and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. LIBSMG95OUL1PH by APC.

USER MANUAL LIBSMG95OUL1PH APC

LIB System for UPS – U6A4

Installation Manual

(80S)

APC LIBSMG95OUL1PH - (80S) - 1

natural_image Technical line drawing of a multi-tiered server rack unit with ventilation grilles and mounting brackets (no text or symbols)

Read this manual carefully before starting to install the battery system. Keep these instructions for future reference.

Copyright © 2019 SAMSUNG SDI Co., Ltd. All rights reserved.

This document contains information that is the property of SAMSUNG SDI Co., Ltd., and provides for the sole purpose of the installation, operation, and maintenance of products of SAMSUNG SDI Co., Ltd. No part of this publication is to be used for any other purpose, and it is not to be reproduced, copied, disclosed, transmitted, stored in a retrieval system, or translated into any human or computer language, in any form, by any means, in whole or in part, without prior written consent of SAMSUNG SDI Co., Ltd.

Although every possible effort has been made to ensure the accuracy of this document, SAMSUNG SDI Co., Ltd. assumes no responsibility for errors that may appear herein. The information is subject to change without notice.

Important Safety Instructions

Read and follow these instructions!

The following precautions are intended to ensure your safety and prevent property damage. Before installing this product, be sure to read all safety instructions in this document for proper installation.

APC LIBSMG95OUL1PH - Read and follow these instructions! - 1DANGER
Failure to comply with the instructions with this symbol may result in a serious accident, causing death or a severe injury.
APC LIBSMG95OUL1PH - Read and follow these instructions! - 2WARNING
Failure to comply with the instructions with this symbol may result in a serious accident, causing a severe injury.
APC LIBSMG95OUL1PH - Read and follow these instructions! - 3CAUTION
Failure to comply with the instructions with this symbol may result in minor or moderate injury.
APC LIBSMG95OUL1PH - Read and follow these instructions! - 4NOTICE
Provides information considered important but not hazard-related. The information relates to property damage.
APC LIBSMG95OUL1PH - Read and follow these instructions! - 5Important
Indicates valuable tips for optimal installation and operation of the product.

General Instructions

Please be aware that a battery presents a risk of electrical shock including high short-circuit current. Follow all safety precautions while operating the batteries.

  • Remove watches, rings, and other metallic accessories.
  • Use tools with insulated handles in order to avoid inadvertent short circuits.
  • Wear rubber gloves and safety boots.
  • Do not put tools or any metal parts on the top of the batteries.
  • Disconnect charging source and load before connecting or disconnecting terminals.
    • Use proper lifting means when moving batteries and wear all appropriate safety clothing and equipment.
  • Batteries must be handled, transported and recycled or discarded in accordance with federal, state, and local regulations. Do not dispose of the batteries in a fire because they can explode.
  • Do not open or mutilate the batteries.
    • Only authorized, trained technicians should perform annual preventive maintenance.
  • Only qualified personnel who are familiar with the batteries and safety precautions should perform installation or maintenance of the battery.
  • Do not allow unauthorized personnel to contact the batteries.

Safety Precautions

The following precautions provide general safety guidelines that should be followed when working with or near the Energy Storage System (ESS). Complete safety parameters and procedures are site-specific and should be developed by the customer for the installation site.

• Review and refer to all safety warnings and cautions in this manual before installation.
• Build a clear, permanent, restricted access area around the system.
- Only authorized, adequately trained electrical operators should be able to access the system.

The interior design of this equipment must be considered a “no-go area except for non-qualified personnel who are familiar with the batteries and safety precautions,” depending on the location. Consult local codes and applicable rules and regulations to determine permit requirements. If required, mark enclosures appropriately before beginning work.

Personnel and Equipment Warnings

Personnel in contact with the battery system should be aware of the following hazards:

APC LIBSMG95OUL1PH - Personnel and Equipment Warnings - 1

WARNING—SHOCK HAZARD

Do not contact system connectors or terminals. Do not open the enclosure doors unless proper lock out/tag out procedures and related trainings are followed in accordance with the local codes and regulations.

APC LIBSMG95OUL1PH - WARNING—SHOCK HAZARD - 1

WARNING—ARC FLASH HAZARD

There is an arc flash hazard associated with all electrical equipment. There is a serious risk of arc flash relating to any equipment modification (e.g. opening doors). Serious injuries can occur in arc flash incidents. Appropriate training is required in accordance with local codes and regulations.

APC LIBSMG95OUL1PH - WARNING—ARC FLASH HAZARD - 1

WARNING—FIRE HAZARD

Fire may occur under certain fault conditions.

APC LIBSMG95OUL1PH - WARNING—FIRE HAZARD - 1

CAUTION—PINCH POINTS

Multiple pinch-points are present in most system components. Be aware that there is a serious risk of injury while working around and in equipment enclosures.

APC LIBSMG95OUL1PH - CAUTION—PINCH POINTS - 1

CAUTION—STATIC SENSITIVE

Electronic appliances can be damaged by electrostatic discharge. Proper handling procedures are required. Be sure to wear a grounded anti-static wrist strap and to discharge static electricity by touching a grounded surface near the equipment before touching any system components.

Dangerous Voltages

APC LIBSMG95OUL1PH - Dangerous Voltages - 1

DANGER

The ESS is powered by multiple power sources. Hazardous voltages may be present in the equipment even when it does not appear operational. Make sure that you completely understand the cautions and warnings in this installation manual. Failure to do so may result in serious injury or death. Follow all manufacturer-published safety procedures.

Electrical equipment can present a risk of electrical shock and can cause arc flash. The following precautions must be observed when working on or around electrical equipment:

  • Remove watches, jewelry, rings, and other metallic objects.
  • Use tools with insulated handles.
  • Safety clothing and shoes must comply with local codes and regulations.

Lock Out/Tag Out Guidelines

APC LIBSMG95OUL1PH - Lock Out/Tag Out Guidelines - 1

DANGER

Follow all applicable lock out/tag out procedures at all times. Failure to follow proper lock out/tag out procedures may result in serious injury or death.

With power applied to the ESS, hazardous voltages are present on some components. To prevent accidental death or injury, do not touch any components within the enclosure unless you are specifically directed to do so. To reduce the risk of electrical shock, make sure that all equipment is properly grounded. For more information, refer to 3.1 Grounding the Battery System

APC LIBSMG95OUL1PH - DANGER - 1

WARNING

Enclosure doors must remain closed except when access to the enclosure interior is required. If possible, personnel should keep a safe distance from enclosures whenever the equipment is energized. Always comply with local, state, and national lock out/tag out guidelines when working with or near the ESS. The lock out/tag out procedures must meet or exceed the requirements of all guidelines presented in SAMSUNG SDI safety documentation. Before entering potentially hazardous areas or beginning work on the ESS, complete the following tasks:

  • Identify and wear protective clothing and shoes.
  • Identify and isolate all power and stored energy sources.
  • Apply appropriate lock out/tag out devices. When applying lock out/tag out to the ESS, do not touch anything within the enclosure except as specifically directed in the work procedures.
  • Complete the site-specific lock out/tag out procedures and safety checklist before beginning work.

General Warnings

APC LIBSMG95OUL1PH - General Warnings - 1

DANGER

When energized, this equipment presents a potential hazard of electric shock, death, and burn. Only authorized personnel who are thoroughly familiar with the equipment and adequately trained should install, operate, or maintain this equipment.

APC LIBSMG95OUL1PH - DANGER - 1

DANGER

To avoid death, personal injury, or damage to the product, follow all safety procedures as regulated by Environmental Health and Safety (EHS) guidelines.

APC LIBSMG95OUL1PH - DANGER - 1

DANGER

To minimize the hazards of electrical shock, death, and burns, approved grounding practices and procedures should be strictly followed.

APC LIBSMG95OUL1PH - DANGER - 1

WARNING

To avoid personal injury and damage to equipment, personnel must adhere to the site protocol concerning working at heights.

Important Safety Instructions

APC LIBSMG95OUL1PH - WARNING - 1

WARNING

To avoid personal injury or equipment damage caused by equipment malfunction, only adequately trained personnel should modify any programmable machine.

APC LIBSMG95OUL1PH - WARNING - 1

WARNING

Always ensure that applicable standards and regulations are followed and only properly certified equipment is used as a critical component of a safety system. Never assume that a safety-critical control loop is functioning correctly.

Table of Contents

Important Safety Instructions....i

General Instructions....ii

Safety Precautions ....ii

Personnel and Equipment Warnings....iii

Dangerous Voltages ....iii

Lock Out/Tag Out Guidelines ....iv

General Warnings ....iv

Table of Contents ...... i

Tables......iii

Figures...... iv

1. About this Manual .... 1

1.1 Purpose.... 1

1.2 Target Audience 1

1.3 Organization.... 1

1.4 Revision History....2

1.5 Acronyms and Abbreviations 3

2. Product Description 4

2.1 Major Components 4

2.1.1 Battery Module (Type A / Type B)....5

2.1.2 SMU (String Management Unit) 7

2.1.3 SMPS Assembly (Type A) 8

2.1.4 Rack Frame 9

3. Installing the Product....10

3.1 Grounding the Battery System 10

3.2 Arc Flash Calculations.... 11

3.3 Installation Procedure 12

3.4 Preparation Stage—Procedure.... 14

3.5 Preparation Stage—Unpacking 15

3.6 Preparation Stage—Ground Wire and Tools 16

3.6.1 Ground Wires 16

3.6.2 Ground Wire Fasteners....16

3.6.3 Rack Fasteners (Anchors) 16

3.6.4 Multiple Rack Fasteners....16

3.7 Preparation Stage—Recommended Tools/Instruments 17

3.8 Preparation Stage—Visual Inspection.... 19

3.8.1 Inspection of the Rack Frame 19

3.8.2 Inspection of the Modules 19

3.8.3 Inspecting the SMU 19

3.8.4 Inspecting the SMPS assembly 20

3.9 Rack Anchoring Stage 21

3.10 Rack Installation Stage 30

3.10.1 Front Door Removal....31

Table of Contents

3.10.2 SMU and SMPS Assembly Installation....33
3.10.3 Battery Module Installation 37
3.10.4 Fuse-Busbar Assembly....40
3.10.5 Busbar Installation 43
3.10.6 Module and SMU Signal Cable Connection 65
3.10.7 SMPS Assembly and SMU Power Cable Connection 74
3.10.8 SMPS Assembly and SMU Signal Cable Connection....75
3.10.9 SMPS Assembly AC Input Connection 77
3.10.10 DC Link Cable Connection 80
3.10.11 AC Input Commissioning 83
3.10.12 BMS Configuration....84
3.10.13 Communication Check....84
3.10.14 Reinstall the Front Door 85
3.10.15 Reinstall the Front Panel....86
3.10.16 Switching on the MCCB 87

Tables

Table 3-1: Estimated time for installation (based on 136S 3P installation)....13

Table 3-2: Parts for 80S 2P Rack 15

Table 3-3: Ground Wire Specifications ....16

Table 3-4: Ground Wire Fastener Specification....16

Table 3-5: Rack Fastener Specifications....16

Table 3-6: Rack Fastener Specifications (Side by side)....16

Table 3-7: Recommended Tools and Instruments....17

Table 3-8: Module Voltage and Internal Impedance ......19

Table 3-9: Rack Clearance Distances....21

Figures

Figure 2-1: Battery Module Type A....5

Figure 2-2: Battery Module Type B....6

Figure 2-3: SMU 7

Figure 2-4: SMPS Assembly Type A....8

Figure 2-5: Rack Frame 9

Figure 3-1: Installation Procedure ....12

Figure 3-2: Clearance Distance for Single Rack Frame....22

Figure 3-3: Clearance Distance for Multiple Rack Frames Installed Side-by-Side 22

Figure 3-4: Clearance Distance for Multiple Rack Frames Installed Side-by-Side and Rear-to-Rear....23

Figure 3-5: Front panel screws (eight)....23

Figure 3-6: Front panel hooks (four)....24

Figure 3-7: Side panel screws (six)....24

Figure 3-8: Side panel hooks (four)....25

Figure 3-9: Rear panel screws (eight) 25

Figure 3-10: Rear panel hooks (four)....26

Figure 3-11: Rack Anchoring Points (4 EA)....26

Figure 3-12: Holes on the sides of the rack (six)....27

Figure 3-13: Reattaching the Side Panels (four hooks and six screws for each panel) ....28

Figure 3-14: Reattaching the Rear Panels....29

Figure 3-15: Front door ajar....31

Figure 3-16: Removing the earth cable....31

Figure 3-17: Removing the front door ....32

Figure 3-18: All doors and front panels removed....32

Figure 3-19: Inserting SMU 33

Figure 3-20: Attaching a SMU to a Rack Frame ....33

Figure 3-21: Ground Cable Connection to the SMU 34

Figure 3-22: Inserting SMPS Assembly....35

Figure 3-23: Attaching the SMPS Assembly 35

Figure 3-24: Ground Cable Connection to the SMPS Assembly 36

Figure 3-25: Insertion of Modules on the Ninth Shelf from the Bottom....37

Figure 3-26: Battery Module Arrangement on the Eighth Shelf ....38

Figure 3-27: Battery Module Arrangement ....38

Figure 3-28 : Module Number ....39

Figure 3-29: Insertion of modules on 5^th shelf....39

Figure 3-30: Fuse Busbar Left Assembly 40

Figure 3-31: Fuse Busbar Left Assembly (Fuse Cover) 41

Figure 3-32: Fuse Busbar Right Assembly 42

Figure 3-33: Fuse Busbar Right Assembly (Fuse Cover) 42

Figure 3-34: Contact Resistance Probe Points (Battery Module Terminal to Busbar) 44

Figure 3-35: Copper Busbar Appearance 45

Figure 3-36: Removing the Module #1's Cover and SMU B-Terminal Cover....46

Figure 3-37: Connect SMU B- and Module #1 B- 46

Figure 3-38: Restore SMU's B-Terminal....47

Figure 3-39: Remove Battery Module #2's Front Cover....47

Figure 3-40: Connect Battery Module #1 B+ and Battery Module #2 B-......48

Figure 3-41: Reattach Battery Module #1's Front Cover ....48

Figure 3-42: Remove Battery Module #2's Front Cover....49

Figure 3-43: Connect Battery Module #2 B+ and Battery Module #3 B-......49

Figure 3-44: Reattach Battery Module #2's Front Cover ....50

Figure 3-45: Remove Battery Module #4's Front Cover....50

Figure 3-46: Connect Battery Module #3 B+ and Module #4 B-. 51

Figure 3-47: Reattach Battery Module #3's Front Cover ....52

Figure 3-48: Remove Battery Module #5's Front Cover....52

Figure 3-49: Connect Battery Module #4 B+ and Battery Module #5 B-....53

Table of Contents

Figure 3-50: Reattach Battery Module #4's Front Cover ....54

Figure 3-51: Remove Battery Module #6's Front Cover....54

Figure 3-52: Connect Battery Module #5 B+ and Battery Module #6 B-....55

Figure 3-53: Reattach Battery Module #5's Front Cover ....56

Figure 3-54: Remove Battery Module #7's Front Cover....56

Figure 3-55: Connect Battery Module #6 B+ and Battery Module #7 B-....57

Figure 3-56: Reattach Battery Module #6's Front Cover ....58

Figure 3-57: Remove Battery Module #8's Front Cover....58

Figure 3-58: Connect Battery Module #7 B+ and Battery Module #8 B-....59

Figure 3-59: Reattach Battery Modules #7's Front Cover....60

Figure 3-60: Remove Battery Modules #9's Front Cover ....60

Figure 3-61: Connect Battery Module #8 B+ and Battery Module #9 B-....61

Figure 3-62: Reattach Battery Modules #8's Front Cover....61

Figure 3-63: Remove Battery Modules #10's Front Cover....62

Figure 3-64 Connect Battery Module #9 B+ and Battery Module #10 B-......62

Figure 3-65: Reattach Battery Module #9's Front Cover ....63

Figure 3-66: Remove SMU B+ Terminal Cover....63

Figure 3-67: Connect SMU B+ and Module #10 B+....64

Figure 3-68: Reattach Battery Module #10's Front Cover and SMU B+ Terminal Cover ....64

Figure 3-69: SMU to Module #1 Signal Cable ....65

Figure 3-70: Module #1 to Module #2 Signal Cabling....66

Figure 3-71: Module #2 to Module #3 Signal Cabling....66

Figure 3-72: Module #3 to Module #4 Signal Cabling....67

Figure 3-73: Module #4 to Module #5 Signal Cabling....67

Figure 3-74: Module #5 to Module #6 Signal Cabling....68

Figure 3-75: Module #6 to Module #7 Signal Cabling....68

Figure 3-76: Module #7 to Module #8 Signal Cabling....69

Figure 3-77: Module #8 to Module #9 Signal Cabling....69

Figure 3-78: Module #9 to Module #10 Signal Cabling....70

Figure 3-79: Pre-Punched Hole for Signal Cable 71

Figure 3-80: Signal Cabling Examples of Left Alignment of SMU ....72

Figure 3-81: Termination Resistor Setting for Last SMU....73

Figure 3-82: DC Power Cables from SMPS Assembly 3 Phase Type A to SMU ....74

Figure 3-83: DC Power Cables from SMPS Assembly 1 Phase Type A to SMU....74

Figure 3-84: CAN Signal Cable Connection from SMPS Assembly 3 Phase Type A to SMU....75

Figure 3-85: TCP/IP Cable Connection to SMPS Assembly....75

Figure 3-86: Dry Contact Cable Connection to SMPS Assembly 76

Figure 3-87: MCCB Extra Auxiliary Connection....76

Figure 3-88: AC Input Terminals of SMPS Assembly 3 Phase Type A....77

Figure 3-89: AC Input Terminals of SMPS Assembly 1 Phase Type A....77

Figure 3-90: SMPS Assembly 3 Phase Type A - AC Input Terminals with Cables Attached ....78

Figure 3-91: SMPS Assembly 1 Phase Type A - AC Input Terminals with Cables Attached ....78

Figure 3-92: AC Input Terminals of SMPS Assembly 3 Phase Type A....79

Figure 3-93: AC Input Terminals of SMPS Assembly 1 Phase Type A....79

Figure 3-94: Grounding Points (2 EA)....80

Figure 3-95: Connecting the DC Link High Current Terminals....81

Figure 3-96: Reattaching the Front Door 85

Figure 3-97: Reattaching the earth cable....85

Figure 3-98: Front panel hooks (four)....86

Figure 3-99: Front panel screws (eight) 86

Figure 3-100: MCCB Handle in Trip Position....87

Figure 3-101: MCCB Handle in Off Position 87

Figure 3-102: MCCB Handle in On Position....87

Table of Contents

1. About this Manual

To make sure that you understand the proper procedures for safe operation, this section briefly describes the purpose, audience, organization, revision history, and acronyms and abbreviations.

1.1 Purpose

The purpose of this manual is to provide information for the safe and successful installation of the product

The instructions in this manual are based on assembly of a three-cabinet system. Other configurations are possible and the instructions can be reduced or expanded to accommodate installation of those systems.

1.2 Target Audience

This installation manual is intended for system administrators and operators who install and configure the product.

1.3 Organization

This manual is composed of the following chapters:

• Chapter 1, "About this Manual," outlines this document.
- Chapter 2, "Product Description," describes the major components of the product.
- Chapter 3, "Installing the Product," explains how to install the product.

1. About this Manual

1.4 Revision History

Rev.DescriptionAuthorDate
0.0First Draft2019.08.20
0.1Revised module voltage check level. SMU Auxiliary switch and SMPS Status auxiliary contact electrical ratings added (Table 2-1, Table 2-11)2019.09.05
0.2Updated Table 3-7: Recommended Tools and Instruments Revised Table 3-2: Parts for 80S 2P Rack Revised 3.10.5 Busbar Installation Revised 3.10.12.3 System BMS Configuration2019.12.27
0.21Revised 3.10.5 Busbar Installation Revised for 128S Configuration2019.02.28
0.3Revised for 80S configuration Version for Schneider Electric2020.03.27
0.4Revised from Rev0.3 Revised Table 3-2: Parts for 80S 2P Rack Revised Table 3-7: Recommended Tools and Instruments Revised 3.10.5 Busbar Installation2020.07.01
0.41Version for Schneider Electric end customer Removed confidential watermark2020.07.01
Approved By:
NameSignatureDate
Reviewers
NameSignatureDate

1.5 Acronyms and Abbreviations

The following acronyms and abbreviations are used in this manual.

AbbreviationsFull Name
AEDAutomated External Defibrillator
BMSBattery Management System
EHSEnvironmental Health and Safety
ESSEnergy Storage System
LOTOLOCK OUT/TAG OUT
OTOvertemperature
OVPOvervoltage Protection
PCSPower Conversion System
SMUString Management Unit
SMPSSwitched Mode Power Supply
SOCState Of Charge
SOHState Of Health
SGSwitchgear
UTUndertemperature
UVPUndervoltage Protection
UPSUninterruptible Power Supply

2. Product Description

Check the components for installation. For more information, please refer to the product specification.

2.1 Major Components

This product has the following components:

• Battery Module (Type A / Type B)
• SMU
• Rack BMS (Embedded in SMU)
- Rack Frame
• SMPS Assembly (Type A)
• System BMS (Embedded in SMPS Assembly Type A)

Refer to the "Product Specification" document for detailed specifications of the components.

2.1.1 Battery Module (Type A / Type B)

Battery Module is the most basic component of the Battery System and it contains the energy storing battery cells. There is a Module BMS inside each Battery Module. Module BMS checks the status of a Battery Module by measuring its voltage and temperature. It also communicates with the SMU to send all measured voltage and temperature data, and to receive commands to control cell balancing.

There are two types of 8S1P Battery Module depending on the position of terminal's polarity. Type A's plus(+) terminal is on the right side. Type B is on the left.

Type A: EM2031AE001A
Type B: EM2031AE002A

Battery Module Type A (Isometric)Battery Module Type A (Front. Front cover removed)

Figure 2-1: Battery Module Type A

2. Product Description

Battery Module Type B (Isometric)Battery Module Type B (Front. Front cover removed)

Figure 2-2: Battery Module Type B

2.1.2 SMU (String Management Unit)

SMU collects all information about the battery system and controls the battery system by switching the main power line and controls each Battery Module by cell balancing. SMU calculates the state-of-charge (SOC) and state-of-health (SOH) of the battery system. Key components in the SMU are Rack BMS, MCCB, and shunt resistor. Rack BMS is the main controller that takes all data from the Module BMS, measures the string voltage and current, determines the state of the battery and controls the MCCB accordingly.

UL: V049-0011BA

APC LIBSMG95OUL1PH - SMU (String Management Unit) - 1

text_image Technical diagram of an electronic device rear panel with labeled ports and connectors

Figure 2-3: SMU

2. Product Description

2.1.3 SMPS Assembly (Type A)

3-Phase Type A (with System BMS): V044-0006BA

1-Phase Type A (with System BMS): V044-0004BA

SMPS Assembly houses the System BMS and SMPS, which provides power to the System BMS and SMU. Two options are available for the SMPS depending on the AC input range and cabling: 3 phase and 1 phase. The System BMS assembly provides data to the external systems (i.e. building management system, UPS, etc.) while controlling and monitoring all connected Rack BMS.

There are two types of SMPS Assembly: Type A is with System BMS and Type B is without System BMS.

SMPS Assembly with 3 Phase AC InputSMPS Assembly with 1 Phase AC Input
Type A (with System BMS)

Figure 2-4: SMPS Assembly Type A

2.1.4 Rack Frame

White: V808-00066A

The Rack Frame is used to mount the modules, SMU and SMPS assembly and provides ground connections for SMU and SMPS Assembly.

(Grounding cable/busbar for the rack frame is necessary for the SMU and SMPS Assembly as they are grounded to the rack frame when installed. An equipment grounding conductor is required to ground the rack frames together and to the UPS module).

APC LIBSMG95OUL1PH - Rack Frame - 1

natural_image Technical line drawing of a multi-tiered server rack unit with ventilation grilles (no text or symbols)

Figure 2-5: Rack Frame

3. Installing the Product

Because this product has a battery with more than 300V present when fully assembled, installer must follow the general safety instructions. This system must be installed by qualified, trained workers familiar with the required instruments. Use appropriate lifting methods when moving the batteries.

APC LIBSMG95OUL1PH - Installing the Product - 1WARNING
The power terminal cap must be left in place on the power terminal of the tray for insulation.Be sure to use insulated tools (torque wrench, extension, socket, etc.).All the instruments must be insulated and no metal articles (e.g. watch, ring) should be present in the installation area.All power switches must be turned off in advance.Prepare a CO _2 fire extinguisher, a first aid kit, and an AED (automated external defibrillator) before installation.

APC LIBSMG95OUL1PH - Installing the Product - 2

3.1 Grounding the Battery System

APC LIBSMG95OUL1PH - Grounding the Battery System - 1

WARNING—SHOCK HAZARD

Verify with a voltmeter that no power is present on the system before beginning work on the battery system or other part of the UPS system. Use lock out/tag out procedures to secure the UPS and batteries Do not contact system connectors or terminals. Follow all applicable safety measures.

Follow all local and national codes and regulations.

Grounding methods and wiring must comply with NEC Article 250.

Grounding is required to prevent electric shock hazards and reduce or eliminate damage caused by electrical noise. Ground connections and ground wire routing vary significantly depending on system configuration and equipment layout. Samsung provides grounding strip on top of each rack. See Figure 3-94: Grounding Points (2 EA).

3.2 Arc Flash Calculations

Arc flash related calculation of the battery system is estimated with the Direct-Current Incident Energy Calculations referenced in Informative Annex D of NFPA 70E Standard for Electrical Safety in the Workplace.

The following battery system is assumed to estimate the worst-case scenario

Battery configuration: 136S

Battery voltage: 571.2V

Battery internal resistance (AC IR): 65mohm

Arc flash related calculation based on this battery system is as follows:

Bolted fault current ( I_bf ): 9000A

1/2 Bolted fault current (1/2 I _bf ): 4500A

Protective device clearing time ( T_arc ): 6ms

Protective device current interrupt capability ( i^2t ): 110000A ^2 s

Estimated DC arc flash incident energy at the maximum power point ( IE_m ): 0.072cal/cm ^2

3.3 Installation Procedure

This product must be installed by following the procedure below:

APC LIBSMG95OUL1PH - Installation Procedure - 1

flowchart
graph LR
    A["1. Preparation Stage"] --> B["2. Rack Anchoring Stage"]
    B --> C["3. Rack Installation Stage"]
    C --> D["4. System Installation Stage"]

Figure 3-1: Installation Procedure

- Preparation Stage

■ Procedure
- Unpacking
■ Ground Wire and Tools
■ Recommended Tools/Instruments
■ Appearance Inspection

- Rack Anchoring Stage

■ Transport the rack frame to the installation location after unpacking
- Arrange the rack frame after checking the positions of holes in the frame and anchoring points
■ Perform the anchoring and ground connections

- Rack Installation Stage

  • Transport the battery modules to the installation location
  • Insert the SMU in the rack frame
  • Insert the SMPS Assembly in the rack frame
    ■ After all components are inserted in the rack frame, attach them to the rack frame
  • Place the battery modules in the rack frame
    ■ Connect the busbars
  • Connect the signal cables from SMU to module, and module to module
    ■ Connect the signal cables from SMU to SMU

• System Installation Stage

■ Connect the SMPS Assembly to AC power source
■ Prepare the items for BMS configuration
- Configure the BMS
■ Perform installation checks

Estimated time for each step is listed below.

3. Installing the Product

Table 3-1: Estimated time for installation (based on 136S 3P installation)

No.StepEstimated Time (HH:MM)Aggregated Time (HH:MM)
1Unpacking00:3000:30
2Inspection01:0001:30
3Rack Anchoring04:0005:30
4Rack InstallationBattery Module00:2005:50
SMU00:1006:00
SMPS Assembly00:1006:10
Rack Fuse Assembly00:3006:40
Busbar01:0007:40
Signal Cables00:2008:00
Power and Control Cables00:2008:20
AC Input Installation00:2008:40
Cable Installation00:1008:50
BMS Configuration00:1009:00

3. Installing the Product

3.4 Preparation Stage—Procedure

For the preparation stage, perform the following steps:

  1. Create the installation plan and check the equipment and instruments for installation.
  2. Check the arrival schedule of the parts required.
  3. Unpack the equipment.
  4. Inspect the equipment.

APC LIBSMG95OUL1PH - Preparation Stage—Procedure - 1

WARNING

  • Do not wear watches, rings, jewelry, or any other metal objects.
  • Wear electrically insulated gloves and safety shoes.

APC LIBSMG95OUL1PH - WARNING - 1

CAUTION

  • Store the product in a dust-free place with the moisture level of below 60% and the temperature level of 23^ C ±5^ C.
  • Keep components out of direct sunlight.

3.5 Preparation Stage—Unpacking

Check the following parts during unpacking:

Table 3-2: Parts for 80S 2P Rack

No.ItemsPart No.Amount(Unit: EA)Remarks
1RACK FRAMEV808-00066A2V808-00066A: White, UL
2BATTERY MODULE Type AEM2031AE001A8
3BATTERY MODULE Type BEM2031AE002A12
4SMUV049-0011BA2
5SMPS ASSEMBLY Type A(WITH SYSTEM BMS ASSEMBLY)V044-0004BA (1 Phase)V044 0006BA (3 phase)2
6BUSBAR M TO SMUV050-00051A4Connect modules and SMU
7BUS-BAR MAINSJ66-00863A12High current bus bar connection for modules
8BUSBAR_805V050-00052A2Connect between modules #3 and #4
9FUSE3601-0018354Connect between modules #3 and #4,and between modules #9 and #10
10FUSE COVER #2V143-00002A8Fuse cover for fuse between modules #3 and #4,and between modules #9and #10
11FUSE BUSBAR LEFT UPPERV050-00002A2Connect between modules #9and #10
12FUSE BUSBAR LEFT LOWERV050-00001A2Connect between modules #9and #10
13FUSE BUSBAR RIGHT UPPERV050-00003A2Connect between modules #3and #4
14FUSE BUSBAR RIGHT LOWERV050-00004A2Connect between modules #3and #4
15WIRE ASSY RACK TO MODULEV046-0005BA2Connect Battery Module #1 and SMU.
16WIRE ASSY MODULE TO MODULE #1SJ39-00673A16Signal Connection for Modules
17WIRE ASSY RACK TO RACK #2SJ39-00674A1Connect Rack between #1 and #2
18WIRE ASSY RACK TO SYSTEMSJ39-00719A1Connect the Rack BMS CAN connector in the SMU to the System BMS CAN connector in the SMPS ASSEMBLY.
19WIRE ASSY RACK TO SMPSSJ39-00718A4Connect the Rack BMS DC IN to SMPS ASSEMBLY DC OUT
20WIRE ASSY MODULE TO MODULE #2SJ39-00678A2Signal connection between modules #5and #6
21WIRE ASSY EARTHSJ39-00725A4Connecting SMPS Assembly and SMU to Rack Frame.
22SCREW M5 X 10SJ60-00068A20Mounting SMU, SMPS, and WIRE ASSY EARTH to Rack Frame
23SCREW M8 X 18V701-00089A40Mounting Busbar to Module
24SCREW M12 X 25SJ60-00138A8Mounting Busbar to Switchgrear
25SCREW M12 X 16SJ60-00137A8Mounting Fuse Busbar to Fuse
26SCREW M10 X 25SJ60-00082A8Mounting Rack Frame to Rack Frame side by side
27NUT M10SJ81-01208A8Mounting Rack Frame to Rack Frame side by side
28M10 FLAT WASHERSJ60-00073A8Mounting Rack Frame to Rack Frame side by side
29WIRE ASSY MCCB AUXSJ39-00807A2Connect to MCCB Aux Contact
30WIRE ASSY DRY CONTACTSJ39-00808A1Connect to SMPS Assembly DRY CONTACT

3.6 Preparation Stage—Ground Wire and Tools

Ground wires for the racks must be provided by the installer. Installer-supplied ground wires must meet the specifications below.

Refer to 3.1 Grounding the Battery System for details on grounding.

3.6.1 Ground Wires

Use ground wire that is 70 sq mm. The ground wire specifications are:

Table 3-3: Ground Wire Specifications ^1

Wire No.Terminal Type
70 sq mm or thickerM12 2 Hole Ring Terminal

3.6.2 Ground Wire Fasteners

Specifications for the ground wire fastening screws are:

Table 3-4: Ground Wire Fastener Specification ^2

SizeHardnessThread PitchMaterial
M12–30L70 (Grade 7)1.25 mm (0.05 in)SS304

3.6.3 Rack Fasteners (Anchors)

Specifications for the rack fastener screws for anchoring the rack frame to the floor are:

Table 3-5: Rack Fastener Specifications ^3

SizeHardnessThread PitchMaterial
M16–L(Bottom Anchor)70 (Grade 7)2.0 mm (0.08 in)SS304

3.6.4 Multiple Rack Fasteners

Rack fasteners are factory-provided. Refer to Table 3-2: Parts for 80S 2P Rack for part number and quantities. Specifications for the rack fastener screws for installing multiple rack frames side-by-side are:

Table 3-6: Rack Fastener Specifications (Side by side)

SizeHardnessThread PitchMaterial
M10–25L (Side)70 (Grade 7)1.5 mm (0.06 in)SS304

3.7 Preparation Stage—Recommended Tools/Instruments

Installers must provide these tools for installing the battery:

Table 3-7: Recommended Tools and Instruments

No.ItemsUsageAppearance
1Power Screwdriver/Drill(Max torque: 26Nm/270 kgf/cm)To fasten SMU and SMPS assemblies to the rack frames(5.1–6.1Nm/50–60 kgf/cm)APC LIBSMG95OUL1PH - Preparation Stage—Recommended Tools/Instruments - 1
2Torque LimiterFor use with torque wrenchAPC LIBSMG95OUL1PH - Preparation Stage—Recommended Tools/Instruments - 2
3Phillips Screwdriver or BitTo fasten SMU and SMPS assemblies to the rack frames(M5 Tip)APC LIBSMG95OUL1PH - Preparation Stage—Recommended Tools/Instruments - 3
4Box CutterOpening boxesAPC LIBSMG95OUL1PH - Preparation Stage—Recommended Tools/Instruments - 4
5ForkliftMoving rack frames and pallets containing modules and SMUAPC LIBSMG95OUL1PH - Preparation Stage—Recommended Tools/Instruments - 5
6Insulated Torque WrenchInstalling a high-current cable(10~50 N.m / 100 ~ 500 kgf.cm)APC LIBSMG95OUL1PH - Preparation Stage—Recommended Tools/Instruments - 6
7Insulated Sockets(13 mm, 17mm and 19mm)Installing power cables and busbarsAPC LIBSMG95OUL1PH - Preparation Stage—Recommended Tools/Instruments - 7
8Insulated Extension for SocketInstalling a power cableAPC LIBSMG95OUL1PH - Preparation Stage—Recommended Tools/Instruments - 8
9Inclinometer/LevelInstalling a rack frameAPC LIBSMG95OUL1PH - Preparation Stage—Recommended Tools/Instruments - 9

3. Installing the Product

No.ItemsUsageAppearance
10Battery TesterMeasure battery module's voltage and internal impedanceHioki BT3554, Fluke BT521 or meters with the same or better voltage and resistance measurement resolution and accuracy is recommended.- Voltage resolution: 1mV- Voltage accuracy: ±0.1% of reading- Resistance resolution: 0.001mΩ- Resistance accuracy: ±1% of readingBattery tester may be used to measure the contact resistance between bus bar and the joining terminal if a dedicated resistance meter is unavailable.APC LIBSMG95OUL1PH - Installing the Product - 1
11Resistance MeterMeasure the contact resistance between bus bar and the joining terminal(Hioki RM3548 or meters with the same or better resistance measurement accuracy is recommended)APC LIBSMG95OUL1PH - Installing the Product - 2

3.8 Preparation Stage—Visual Inspection

APC LIBSMG95OUL1PH - Preparation Stage—Visual Inspection - 1

CAUTION

- If any defects are found during the inspection, contact the SAMSUNG SDI customer service department.

3.8.1 Inspection of the Rack Frame

After transporting the rack frame to the installation location, check for:

  • Structural damage
  • Paint peeling
    • Damaged or protruding screws.

After completion, install or package the rack for protection during storage.

3.8.2 Inspection of the Modules

After transporting the modules to the installation location, check for:

• Physical damage to the exterior
• Damaged or protruding screws
- Proper voltage and internal impedance of the battery modules using the battery tester.

Table 3-8: Module Voltage and Internal Impedance

No.ItemsValue
1Voltage Check28.080 ~ 29.104V
2Internal Impedance Check3.0 ~ 4.3 mΩ

After completion, install the battery module in the previously installed rack or return the battery module to its original packing for protection during storage.

3.8.3 Inspecting the SMU

After transporting the SMU to its installation location, check for:

  • Physical damage
  • Paint peeling
    • Damaged or protruding screws.

After completion, install the SMU in the previously installed rack or return the SMU to its original packing for protection during storage.

3. Installing the Product

3.8.4 Inspecting the SMPS assembly

After transporting the SMPS Assembly to its installation location, check for:

  • Physical damage
  • Paint peeling
    • Damaged or protruding screws.

After completion, install the SMPS in the previously installed rack or return the SMPS to its original packing for protection during storage.

3.9 Rack Anchoring Stage

Install the rack frame on a flat, level surface.

APC LIBSMG95OUL1PH - ▶ To attach the rack and perform the related works - 1CAUTION
·Use a proper transportation method considering the weight of the rack frame.·Ensure that the safety of the working place is maintained.·When using a forklift, lift the rack frame from the front.·When a forklift cannot be used, use a mechanical lift or move it by hand with three or more people.·Use lock washers to prevent bolts from loosening.·Use an inclinometer or carpenter's level to ensure that the rack frame is plumb.
APC LIBSMG95OUL1PH - ▶ To attach the rack and perform the related works - 2NOTICE
·Failure to anchor the rack frame on a flat and level surface may distort the rack frame after installing the racks side-by-side.·Frame distortion may make the rack doors difficult or impossible to open.
APC LIBSMG95OUL1PH - ▶ To attach the rack and perform the related works - 3NOTICE
·In seismically active areas, the front panel and the rear panel of the rack frame must be installed.

In order to anchor the racks in all four points, racks are recommended to be placed according to the workable distances listed in the table below. In seismically active areas, all four anchor points of the rack must be installed.

To reduce the product footprint, the racks can be installed side-by-side and rear-to-rear against a wall or next to another rack. In this case, only two anchor points on the front side of each rack can be installed. Proper cooling and ventilation of the installed area is recommended for racks installed with no side and rear clearance. Front side of the rack must be cleared for installation, maintenance, service access, and ventilation and cooling.

Clearance from the top of the rack frame is not required and the top of the rack frame can be covered to prevent any foreign objects from falling into the battery rack frame.

Table 3-9: Rack Clearance Distances

ConfigurationAnchor points per rackClearance Distance (mm)
Side (end)Side (adjacent)RearFront
Single Rack2 (Front) not rated for seismic event0n/a0Workable distance (1000 recommended)
4 (All) – Telcordia Zone 4Workable distance (800 recommended)n/aWorkable distance (800 recommended)Workable distance (1000 recommended)
Multiple Racks (Side-to-Side)2 (Front) not rated for seismic event000Workable distance (1000 recommended)
4 (All) – Telcordia Zone 4Workable distance (800 recommended)0Workable distance (800 recommended)Workable distance (1000 recommended)

3. Installing the Product

ConfigurationAnchor points per rackClearance Distance (mm)
Side (end)Side (adjacent)RearFront
Multiple Racks(Side-to-Sideand Rear-to-Rear)2 (Front)not rated for seismic event000Workable distance(1000 recommended)
4 (All) – Telcordia Zone 4Workable distance(800 recommended)0Workable distance(800 recommended)Workable distance(1000 recommended)

Two anchor points (not rated for seismic event)
APC LIBSMG95OUL1PH - Installing the Product - 1

text_image Rear Front Workable distance (1000mm recommended)

Four anchor points (Telcordia Zone 4)
APC LIBSMG95OUL1PH - Installing the Product - 2

text_image Workable distance (800mm recommended) Rear Workable distance (800mm recommended) Front Workable distance (1000mm recommended)

Figure 3-2: Clearance Distance for Single Rack Frame

Two anchor points (not rated for seismic event)
APC LIBSMG95OUL1PH - Installing the Product - 3

text_image Rear Front Workable distance (1000mm recommended)

Four anchor points (Telcordia Zone 4)
APC LIBSMG95OUL1PH - Installing the Product - 4

text_image Workable distance (800mm recommended) Pear Workable distance (800mm recommended) Front Workable distance (1000mm recommended)

Figure 3-3: Clearance Distance for Multiple Rack Frames Installed Side-by-Side

3. Installing the Product

Two anchor points (not rated for seismic event)
APC LIBSMG95OUL1PH - Installing the Product - 1

text_image Workable distance (1000mm recommended) Front Rear Rear Front Workable distance (1000mm recommended)

Four anchor points (Telcordia Zone 4)
APC LIBSMG95OUL1PH - Installing the Product - 2

text_image Workable distance (1000mm recommended) Front Workable distance (800mm recommended) Rear Workable distance (800mm recommended) Rear Workable distance (800mm recommended) Front Workable distance (1000mm recommended)

Figure 3-4: Clearance Distance for Multiple Rack Frames Installed Side-by-Side and Rear-to-Rear

  1. After unpacking the rack frame, transport it to its installation location.
  2. Remove the front panels, side panels and rear panel from the rack frame. Unscrew the screws on each panel and lift the panel to undo the hooks to the frame on each panel. Do not misplace the screws, as they are needed when installing the panels back after anchoring the rack frame.

APC LIBSMG95OUL1PH - Installing the Product - 3

natural_image Technical line drawing of a server rack unit with a magnified inset showing internal components (no text or symbols)

Figure 3-5: Front panel screws (eight)

3. Installing the Product

APC LIBSMG95OUL1PH - Installing the Product - 1

natural_image Technical line drawing of a server rack unit with an inset close-up showing internal components (no text or symbols)

Figure 3-6: Front panel hooks (four)

APC LIBSMG95OUL1PH - Installing the Product - 2

natural_image Technical line drawing of a server rack with ventilation grilles and a magnified inset showing internal components (no text or symbols)

Figure 3-7: Side panel screws (six)

3. Installing the Product

APC LIBSMG95OUL1PH - Installing the Product - 1

natural_image Technical line drawing of a server rack cabinet with an inset close-up showing a door handle (no text or symbols present)

Figure 3-8: Side panel hooks (four)

APC LIBSMG95OUL1PH - Installing the Product - 2

natural_image Technical line drawing of a server rack cabinet with an inset close-up showing internal components (no text or symbols)

Figure 3-9: Rear panel screws (eight)

3. Installing the Product

APC LIBSMG95OUL1PH - Installing the Product - 1

natural_image Technical line drawing of a server rack unit with a magnified inset showing internal components (no text or symbols)

Figure 3-10: Rear panel hooks (four)

  1. Arrange the rack frame after verifying that the holes in the frame and anchoring points are aligned.
  2. Connect four anchoring points on the bottom of the rack.

APC LIBSMG95OUL1PH - Installing the Product - 2

NOTICE

  • Anchor the frame with M16 bolts and nuts.
    ■ The fastening torque should be 140Nm / 1,425kgf cm.
  • Check the rack and other parts for distortion caused by unpacking.

APC LIBSMG95OUL1PH - NOTICE - 1

text_image Bottom of the Rack Frame

Figure 3-11: Rack Anchoring Points (4 EA)

3. Installing the Product

  1. Connect the racks together using M10 hardware through holes in the sides ("SCREW M10 X 25," "M10 FLAT WASHER" and "NUT M10"). Torque the bolts to 30Nm (300kgf cm).

APC LIBSMG95OUL1PH - Installing the Product - 1

natural_image Technical line drawing of a multi-tiered storage unit with internal compartments and a magnified inset showing a close-up detail (no text or symbols)

Figure 3-12: Holes on the sides of the rack (six)

  1. Optional step: After all the rack frames are anchored and connected, reattach the side panels to the outermost rack frames using the provided M5 Screws for each side panel. Fasten the screws using torque of 5.1–6.1 Nm (50–60 kgf/cm). Make sure all the hooks are inserted to the slot and the panel is flush with the rack frame before screwing.

3. Installing the Product

APC LIBSMG95OUL1PH - Installing the Product - 1

text_image Technical diagram of server rack with zoomed-in views showing internal components and connection details

Figure 3-13: Reattaching the Side Panels (four hooks and six screws for each panel)

  1. Reattach the rear panels to the rack frames using the provided M5 Screws for each rear panel. Fasten the screws using torque of 5.1–6.1 Nm (50–60 kgf/cm). Make sure all the hooks are inserted to the slot and the panel is flush with the rack frame before screwing.

3. Installing the Product

APC LIBSMG95OUL1PH - Installing the Product - 1

text_image Technical diagram showing exploded view and close-up of server rack components with Chinese annotations

Figure 3-14: Reattaching the Rear Panels

  1. Front panels will be reattached after all the components are installed.

3.10 Rack Installation Stage

APC LIBSMG95OUL1PH - Rack Installation Stage - 1WARNING
Arc Flash and Shock HazardInsulated tools are required for any work on this energized equipment.
APC LIBSMG95OUL1PH - Rack Installation Stage - 2WARNING
Sharp EdgesWear gloves and other protective gear to prevent injury.
APC LIBSMG95OUL1PH - Rack Installation Stage - 3WARNING
Pinch PointUse caution when working in the enclosure to prevent injury.
APC LIBSMG95OUL1PH - Rack Installation Stage - 4CAUTION
Heavy ObjectCan cause muscle strain or back injury.Use lifting aids and proper lifting techniques when moving trays, batteries and other heavy objects.

3.10.1 Front Door Removal

  1. Open the front door of the panel using the provided key.

APC LIBSMG95OUL1PH - Front Door Removal - 1

natural_image Technical line drawing of a multi-tiered server rack cabinet with ventilation grilles (no text or labels)

Figure 3-15: Front door ajar

  1. Remove the earth cable from the rack frame to the front door. Do not misplace the two screws and the earth cable.

APC LIBSMG95OUL1PH - Front Door Removal - 2

natural_image Technical diagram of a server rack with an inset showing internal components and a curved orange line indicating a connection (no text or symbols present)

Figure 3-16: Removing the earth cable

  1. Lift the front door to remove it from its hinge. Do not misplace the door.

3. Installing the Product

APC LIBSMG95OUL1PH - Installing the Product - 1

natural_image Diagram of a server rack with an open panel and internal components, showing a close-up view of the rack structure (no text or symbols present)

Figure 3-17: Removing the front door

  1. If installing more than one rack, remove all the doors.

APC LIBSMG95OUL1PH - Installing the Product - 2

natural_image Technical line drawing of a multi-tiered storage unit cabinet with multiple panels and mounting brackets (no text or symbols)

Figure 3-18: All doors and front panels removed.

3.10.2 SMU and SMPS Assembly Installation

APC LIBSMG95OUL1PH - SMU and SMPS Assembly Installation - 1Important
Attach each SMU to its rack frame with four M5 x 10L screws. (Torque: 5.1–6.1 Nm [50–60 kgf cm])Verify that the torque setting is correct.
  1. Insert the SMU through the front of the rack as shown in Figure 3-19: Inserting SMU

APC LIBSMG95OUL1PH - SMU and SMPS Assembly Installation - 2

natural_image Technical line drawing of a multi-level industrial storage unit with a yellow box attached to one panel (no text or symbols)

Figure 3-19: Inserting SMU

  1. After all SMU's are inserted in the rack frames, attach each to the rack frame with four M5 x 10L bolts. (Torque: 5.1–6.1 Nm [50–60 kgf cm])

APC LIBSMG95OUL1PH - SMU and SMPS Assembly Installation - 3

text_image Technical diagram showing electrical panel installation with labeled components and a magnified view of the device's internal structure.

Figure 3-20: Attaching a SMU to a Rack Frame

  1. After all SMU's are inserted into the rack frame, connect the ground cable.

3. Installing the Product

APC LIBSMG95OUL1PH - Installing the Product - 1

NOTICE

  • Connect a ground cable between the SMU and the Rack Frame (SCREW M5 x 10L). (Torque: 5.1–6.1 Nm [50–60 kgf·cm])
  • Verify that the torque setting is correct.

APC LIBSMG95OUL1PH - NOTICE - 1

natural_image Technical line drawing of an electronic device rear panel with labeled ports and mounting holes (no readable text or symbols)

Figure 3-21: Ground Cable Connection to the SMU

3. Installing the Product

  1. Insert SMPS Assembly into the rack frames designated for SMPS Assembly as shown in Figure 3-22: Inserting SMPS Assembly
APC LIBSMG95OUL1PH - Installing the Product - 1Important
Attach the inserted SMPS Assemblies to the rack frames by fastening each with four M5 x 10Lscrews(Torque: 5.1–6.1 Nm [50–60 kgf cm])Verify that the torque setting is correct.
  1. Slide the SMPS Assembly into the rack frame on the shelf designated for the SMPS Assembly as shown below.

APC LIBSMG95OUL1PH - Installing the Product - 2

natural_image Technical line drawing of a multi-level rack-mounted server unit with multiple panels and ventilation slots (no text or labels)

Figure 3-22: Inserting SMPS Assembly

  1. After all SMPS Assemblies are inserted into the rack frames, attach them to the rack frame with screws (Torque: 5.1–6.1 Nm [50–60 kgf cm])

APC LIBSMG95OUL1PH - Installing the Product - 3

text_image Technical diagram of an electronic device rear panel with labeled ports and warning symbols, including a magnified inset showing a cable or cable pin.

Figure 3-23: Attaching the SMPS Assembly

  1. After all SMPS Assemblies are attached to the rack frames, connect the ground cables.

3. Installing the Product

APC LIBSMG95OUL1PH - Installing the Product - 1

text_image NOTICE • Connect a ground cable between the SMPS Assembly and the Rack Frame with an M5 x 10L screw. (Torque: 5.1–6.1 Nm [50–60 kgf cm]) • Verify that the torque setting is correct.

Figure 3-24: Ground Cable Connection to the SMPS Assembly

3. Installing the Product

3.10.3 Battery Module Installation

  1. Transport battery modules to the installation location.

  2. Measure the modules' voltage and internal impedance. All modules in one rack frame must be near the same state of charge. The batteries must have an output within 300mV of each other and internal impedance difference of 1.3mΩ. Refer to Table 3-8: Module Voltage and Internal Impedance.

  3. Place the battery modules on the rack frame.

APC LIBSMG95OUL1PH - Battery Module Installation - 1Important
Samsung recommends installing Battery Modules in the upper shelves first and proceeding to the bottom.(Two Type B battery modules are inserted in the ninth shelf from the bottom.)Ten battery modules can be inserted into a rack frame as shown in Figure 3-27.Refer to 2.1.1 for information on the different battery module types.

APC LIBSMG95OUL1PH - Battery Module Installation - 2

text_image Two Type B Battery Modules

Figure 3-25: Insertion of Modules on the Ninth Shelf from the Bottom

3. Installing the Product

APC LIBSMG95OUL1PH - Installing the Product - 1

text_image Two Type A Battery Modules

Figure 3-26: Battery Module Arrangement on the Eighth Shelf

Two Type B Battery Modules Two Type A Battery Modules Two Type B Battery Modules Two Type A Battery Modules Two Type B Battery Modules

APC LIBSMG95OUL1PH - Installing the Product - 2

natural_image Technical line drawing of a multi-level rack-mounted server or control unit with multiple monitors and ventilation units (no text or labels visible)

Figure 3-27: Battery Module Arrangement

3. Installing the Product

Module #10

Module #9

Module #8

Module #7

Module #6

APC LIBSMG95OUL1PH - Installing the Product - 1

natural_image Technical line drawing of a multi-chamber industrial or server rack system with multiple monitors and control panels (no text or labels)

Module #1

Module #2

Module #3

Module #4

Module #5

Figure 3-28 : Module Number

APC LIBSMG95OUL1PH - Installing the Product - 2Important
Samsung recommends installing modules from top to bottom.The bottom shelf (5 ^th shelf) has two Type B modules, as shown in Figure 3-29.

APC LIBSMG95OUL1PH - Installing the Product - 3

natural_image Technical line drawing of a server rack cabinet with internal compartments and mounting brackets (no text or labels)

Figure 3-29: Insertion of modules on 5 ^th shelf

3. Installing the Product

3.10.4 Fuse-Busbar Assembly

Three types of fuse-busbar assemblies must be assembled before installing them to the Battery Modules.

APC LIBSMG95OUL1PH - Fuse-Busbar Assembly - 1

NOTICE

  • Rack Fuse Busbar Assembly is assembled at the installation location.
    ■ M12 X 16L screws are used to assemble the busbars and fuse.
  • The fastening torque should be 30 Nm (300 kgf/cm).
  • After torqueing, torque mark the screws using a colored marker or a torque seal.
  • When assembling the fuse, make sure the "red indicator arm" on the fuse is facing the front of the unit.

1. Assemble the Fuse Busbar Left Assembly.

Fuse Busbar Left Assembly is comprised of one "FUSE BUSBAR LEFT UPPER", one one "FUSE BUSBAR LEFT LOWER", two "SCREW M12 X 16", two "FUSE COVER #2", and one "FUSE"

APC LIBSMG95OUL1PH - Assemble the Fuse Busbar Left Assembly. - 1

text_image SCREW M12 X 16 FUSE BUSBAR LEFT UPPER FUSE SCREW M12 X 16 FUSE BUSBAR LEFT LOWER

Figure 3-30: Fuse Busbar Left Assembly

3. Installing the Product

APC LIBSMG95OUL1PH - Installing the Product - 1

text_image FUSE COVER #2 FUSE COVER #2

Figure 3-31: Fuse Busbar Left Assembly (Fuse Cover)

3. Installing the Product

2. Assemble the Fuse Busbar Right Assembly.

Fuse Busbar Right Assembly is comprised of one "FUSE BUSBAR RIGHT UPPER", one one "FUSE BUSBAR RIGHT LOWER", two "SCREW M12 X 16", two "FUSE COVER #2", and one "FUSE"

APC LIBSMG95OUL1PH - Assemble the Fuse Busbar Right Assembly. - 1

text_image FUSE BUSBAR RIGHT UPPER SCREW M12 X 16 FUSE SCREW M12 X 16 FUSE BUSBAR RIGHT LOWER

Figure 3-32: Fuse Busbar Right Assembly

APC LIBSMG95OUL1PH - Assemble the Fuse Busbar Right Assembly. - 2

text_image FUSE COVER #2 FUSE COVER #2

Figure 3-33: Fuse Busbar Right Assembly (Fuse Cover)

3.10.5 Busbar Installation

Connect the power busbars between modules

APC LIBSMG95OUL1PH - Busbar Installation - 1

Verify with a voltmeter that no power is present on the system. Use lock out/tag out procedures to secure the UPS and batteries.

APC LIBSMG95OUL1PH - Verify with a voltmeter that no power is present on the system. Use lock out/tag out procedures to secure the UPS and batteries. - 1

CAUTION

  • Please follow the instructions to protect the module BMS against damage.
  • Important: DO NOT deviate from the sequence of steps below.
  • The system's voltage will increase proportionally as battery modules are connected. Exercise extreme caution to prevent the terminals from contacting anything except their intended mounting points.
  • Terminals and their connected wires have either positive or negative polarity (Positive: B+, P+; Negative: B-, P-). The polarity of a terminal or a wire connected to the terminal is on the front of each module and SMU. Exercise extreme caution to prevent the terminals and/or wires with opposite polarity from contacting with each other.
  • It is recommended not to touch the battery positive(+) or negative(-) terminal for the batteries with rack frame. There is no evidence of dielectric breakdown because of electrical isolation between the battery positive (+) or negative (-) terminals and rack frame. However, it is recommended not to touch them for safety because It is possible to touch between battery positive (+) and negative (-) through the rack frame.

APC LIBSMG95OUL1PH - CAUTION - 1

NOTICE

  • Connect the power busbar with an M8 screw for battery module terminals
    The fastening torque should be 12.2–14.0 Nm (124–142 kgf/cm).
  • Use an insulated torque wrench extension with a 13 mm socket.
    ■ After torqueing, torque mark the screws using a colored marker or a torque seal.

APC LIBSMG95OUL1PH - NOTICE - 1

NOTICE

  • Connect the power bus-bar with an M12 screw for SMU terminals
    ■ The fastening torque should be 30 Nm/300 kgf·cm.
    ■ Use an insulated torque wrench extension with a 19 mm socket.
    ■ After torqueing, torque mark the screws using a colored marker or a torque seal.

APC LIBSMG95OUL1PH - NOTICE - 1

Important

  • The power terminals, such as "B+", "B-", "P+", and "P-", of the module and SMU are covered with the power terminal cover to guard against a short circuit.
  • At each step in this process, you must remove the cover prior to connecting a power busbar and reattach the cover immediately after connecting the power busbars.

3. Installing the Product

APC LIBSMG95OUL1PH - Installing the Product - 1

NOTICE

■ After connecting the busbar to the terminals (battery module, SMU, fuse), measure the contact resistance between the terminals and the busbars using a low resistance meter. Refer to Figure 3-34: Contact Resistance Probe Points (Battery Module Terminal to Busbar) for location of the measurement. Use similar probe locations for SMU terminal to busbar contact resistance, and fuse to busbar contact resistance. Make sure each probe is in contact with only the intended location.
- The contact resistance must be measured below 40μΩ. It is recommended to keep the contact resistance in all terminals below 30μΩ.

APC LIBSMG95OUL1PH - NOTICE - 1

text_image Probe 1 Probe 2

Figure 3-34: Contact Resistance Probe Points (Battery Module Terminal to Busbar)

3. Installing the Product

APC LIBSMG95OUL1PH - Installing the Product - 1Important
▪ For contacts with contact resistance that are greater than 40μΩ, it is recommended to polish the joining surface of the bus bars with a fine abrasive material (grit 600 or higher) such as sandpaper or scrubbing pad. Polish until the surface is evenly scratched and the color is equivalent of “freshly polished” on color chart used in ASTM D-130 Copper Strip Corrosion Standards. Refer to Figure 3-35: Copper Busbar Appearance.
APC LIBSMG95OUL1PH - Installing the Product - 2NOTICE
▪ After polishing the busbar, make sure the metallic particle does not settle on the electronics. Clean the surface with a dry cloth before assembling the busbar to the terminal.

APC LIBSMG95OUL1PH - Installing the Product - 3

natural_image Two metallic plate samples labeled 'Not Polished' and 'Freshly Polished', showing circular holes on a green background (no text or symbols on the plates themselves)

Figure 3-35: Copper Busbar Appearance

3. Installing the Product

  1. Remove Battery Module #1's front cover and the SMU B-terminal cover.

APC LIBSMG95OUL1PH - Installing the Product - 1

natural_image Technical diagram showing internal layout of industrial equipment with orange components, enclosed in a circular inset (no text or labels visible)

Figure 3-36: Removing the Module #1's Cover and SMU B-Terminal Cover

  1. Connect SMU B- and Module #1 B- using "BUSBAR M TO SMU." SMU B- terminal is connected using an M12 screw and Battery Module #1 B- terminal is connected using an M8 screw. Measure the contact resistance between the terminals and the bus bar.

APC LIBSMG95OUL1PH - Installing the Product - 2

natural_image Technical line drawing of a server rack system with multiple monitors and control panels (no text or labels visible)

Figure 3-37: Connect SMU B- and Module #1 B-

3. Installing the Product

  1. Reattach SMU's B-terminal cover.

APC LIBSMG95OUL1PH - Installing the Product - 1

natural_image Technical line drawing of an industrial automation system with labeled components and a zoomed-in view of the main structure (no text or symbols present)

Figure 3-38: Restore SMU's B-Terminal

  1. Remove Battery Module #2's front cover.

APC LIBSMG95OUL1PH - Installing the Product - 2

natural_image Isometric diagram of a multi-level storage or warehouse system with orange highlighted components, no text or symbols present.

Figure 3-39: Remove Battery Module #2's Front Cover

3. Installing the Product

  1. Connect Battery Module #1 B+ and Module #2 B- using "BUS-BAR MAIN." Connect using an M8 screw. Measure the contact resistance between the terminal and the bus bar.

APC LIBSMG95OUL1PH - Installing the Product - 1

natural_image Technical line drawing of a server rack system with an inset view showing internal components (no text or labels)

Figure 3-40: Connect Battery Module #1 B+ and Battery Module #2 B-.

  1. Reattach Battery Module #1's front cover and remove Battery Module #3's front cover.

APC LIBSMG95OUL1PH - Installing the Product - 2

natural_image Architectural diagram showing a grid layout within a building frame, with an inset close-up of the structure (no text or symbols visible)

Figure 3-41: Reattach Battery Module #1's Front Cover

3. Installing the Product

APC LIBSMG95OUL1PH - Installing the Product - 1

natural_image Isometric architectural diagram of a multi-level building with orange structural elements, showing internal layout and exterior view (no text or symbols)

Figure 3-42: Remove Battery Module #2's Front Cover

  1. Connect Battery Module #2 B+ and Battery Module #3 B- using "BUS-BAR MAIN." Connect using an M8 screw. Measure the contact resistance between the terminal and the bus bar.

APC LIBSMG95OUL1PH - Installing the Product - 2

natural_image Architectural line drawing of a multi-level building facade with internal compartments and a close-up view of the server rack (no text or symbols)

Figure 3-43: Connect Battery Module #2 B+ and Battery Module #3 B-.

3. Installing the Product

  1. Reattach Battery Module #2's front cover and remove Battery Module #4's front cover.

APC LIBSMG95OUL1PH - Installing the Product - 1

natural_image Architectural diagram showing a grid layout within a building frame, with an inset magnified view of the exterior wall (no text or symbols)

Figure 3-44: Reattach Battery Module #2's Front Cover

APC LIBSMG95OUL1PH - Installing the Product - 2

natural_image Isometric diagram of a multi-level storage or rack system with orange grid overlay, no text or symbols present

Figure 3-45: Remove Battery Module #4's Front Cover

3. Installing the Product

  1. Connect Battery Module #3 B+ and Module #4 B- using "FUSE BUSBAR RIGHT ASSEMBLY". Connect using an M8 screw. Measure the contact resistance between the terminal and the bus bar.

APC LIBSMG95OUL1PH - Installing the Product - 1

text_image Technical diagram showing a multi-level rack system with an orange highlighted section and a zoomed-in view of the rack structure.

Figure 3-46: Connect Battery Module #3 B+ and Module #4 B-.

3. Installing the Product

  1. Reattach Battery Module #3's front cover and remove Battery Module #5's front cover.

APC LIBSMG95OUL1PH - Installing the Product - 1

natural_image Isometric line drawing of a server rack with orange grid overlay, showing internal components and no text or symbols

Figure 3-47: Reattach Battery Module #3's Front Cover
APC LIBSMG95OUL1PH - Installing the Product - 2

natural_image Isometric diagram of a warehouse or storage room layout with numbered compartments and a highlighted orange storage unit (no text or symbols present)

Figure 3-48: Remove Battery Module #5's Front Cover

3. Installing the Product

  1. Connect Battery Module #4 B+ and Battery Module #5 B- using "BUS-BAR MAIN." Connect using an M8 screw. Measure the contact resistance between the terminal and the bus bar.

APC LIBSMG95OUL1PH - Installing the Product - 1

natural_image Isometric line drawing of a server rack with multiple units and a highlighted orange section (no text or symbols)

Figure 3-49: Connect Battery Module #4 B+ and Battery Module #5 B-.

3. Installing the Product

  1. Reattach Battery Module #4's front cover and remove Battery Module #6's front cover.

APC LIBSMG95OUL1PH - Installing the Product - 1

natural_image Isometric line drawing of a server rack with an orange grid box, no text or symbols present

Figure 3-50: Reattach Battery Module #4's Front Cover

APC LIBSMG95OUL1PH - Installing the Product - 2

natural_image Technical line drawing of an electrical cabinet with internal components and a magnified view of the cabinet (no text or symbols present)

Figure 3-51: Remove Battery Module #6's Front Cover

3. Installing the Product

  1. Connect Battery Module #5 B+ and Battery Module #6 B- using "BUSBAR 80S". Connect using an M8 screw. Measure the contact resistance between the terminal and the bus bar.

APC LIBSMG95OUL1PH - Installing the Product - 1

text_image Technical diagram showing a multi-level computer rack with labeled components and an inset view of the rack-mounted unit.

Figure 3-52: Connect Battery Module #5 B+ and Battery Module #6 B-.

3. Installing the Product

  1. Reattach Battery Module #5's front cover and remove Battery Module #7's front cover.

APC LIBSMG95OUL1PH - Installing the Product - 1

natural_image Architectural diagram showing a building inside a storage unit with numbered compartments (no text or symbols present)

Figure 3-53: Reattach Battery Module #5's Front Cover
APC LIBSMG95OUL1PH - Installing the Product - 2

natural_image Architectural diagram showing internal layout of equipment and a multi-level control room (no text or symbols visible)

Figure 3-54: Remove Battery Module #7's Front Cover

3. Installing the Product

  1. Connect Battery Module #6 B+ and Battery Module #7 B- using "BUS-BAR MAIN." Connect using an M8 screw. Measure the contact resistance between the terminal and the bus bar.

APC LIBSMG95OUL1PH - Installing the Product - 1

natural_image Architectural diagram showing a multi-level storage unit with internal compartments and a separate rack unit (no text or labels visible)

Figure 3-55: Connect Battery Module #6 B+ and Battery Module #7 B-

3. Installing the Product

  1. Reattach Battery Module #6's front cover and remove Battery Module #8's front cover.

APC LIBSMG95OUL1PH - Installing the Product - 1

natural_image Architectural floor plan and server rack layout diagram showing room layouts and storage racks (no text or labels)

Figure 3-56: Reattach Battery Module #6's Front Cover
APC LIBSMG95OUL1PH - Installing the Product - 2

natural_image Architectural floor plan and server rack layout diagram (no text or labels)

Figure 3-57: Remove Battery Module #8's Front Cover

3. Installing the Product

  1. Connect Battery Module #7 B+ and Battery Module #8 B- using "BUS-BAR MAIN." Connect using an M8 screw. Measure the contact resistance between the terminal and the bus bar.

APC LIBSMG95OUL1PH - Installing the Product - 1

natural_image Architectural diagram showing a multi-level building layout with labeled components and an inset view of a server rack unit (no text or symbols present)

Figure 3-58: Connect Battery Module #7 B+ and Battery Module #8 B-

3. Installing the Product

  1. Reattach Battery Modules #7's front cover and remove Battery Modules #9's front cover.

APC LIBSMG95OUL1PH - Installing the Product - 1

natural_image Technical line drawing of a server rack with internal components and a highlighted orange panel (no text or symbols)

Figure 3-59: Reattach Battery Modules #7's Front Cover
APC LIBSMG95OUL1PH - Installing the Product - 2

natural_image Technical line drawing of a server rack with internal components and a highlighted grid panel (no text or symbols)

Figure 3-60: Remove Battery Modules #9's Front Cover

3. Installing the Product

  1. Connect Battery Module #8 B+ and Battery Module #9 B- using "BUS-BAR MAIN." Connect using an M8 screw. Measure the contact resistance between the terminal and the bus bar.

APC LIBSMG95OUL1PH - Installing the Product - 1

natural_image Technical line drawing of a server rack system with internal components and a magnified view (no text or labels)

Figure 3-61: Connect Battery Module #8 B+ and Battery Module #9 B-.

  1. Reattach Battery Module #8's front cover and remove Battery Module #10's front cover.

APC LIBSMG95OUL1PH - Installing the Product - 2

natural_image Architectural floor plan and server rack layout diagram showing internal components (no text or labels)

Figure 3-62: Reattach Battery Modules #8's Front Cover

3. Installing the Product

APC LIBSMG95OUL1PH - Installing the Product - 1

natural_image Architectural floor plan and internal layout diagram showing building layouts and storage units (no text or labels)

Figure 3-63: Remove Battery Modules #10's Front Cover

  1. Connect Battery Module #9 B+ and Battery Module #10 B- using "FUSE BUSBAR LEFT ASSEMBLY." Connect using an M8 screw. Measure the contact resistance between the terminal and the bus bar.

APC LIBSMG95OUL1PH - Installing the Product - 2

text_image Technical diagram showing a floor plan with labeled rooms and an inset view of a server rack unit with labeled panels.

Figure 3-64 Connect Battery Module #9 B+ and Battery Module #10 B-.

3. Installing the Product

  1. Reattach Battery Module #9's front cover and remove SMU's B+ terminal cover.

APC LIBSMG95OUL1PH - Installing the Product - 1

natural_image Architectural diagram showing internal layout of building units and a separate server rack unit (no text or symbols)

Figure 3-65: Reattach Battery Module #9's Front Cover
APC LIBSMG95OUL1PH - Installing the Product - 2

natural_image Technical line drawing of an electronic device interior with labeled components and a separate rack unit (no text or symbols present)

Figure 3-66: Remove SMU B+ Terminal Cover

3. Installing the Product

  1. Connect SMU B+ and Battery Module #10 B+ using "BUSBAR M TO SMU." SMU B+ terminal is connected using an M12xL25 screw and Module #10 B+ terminal is connected using an M8 screw. Measure the contact resistance between the terminal and the bus bar.

APC LIBSMG95OUL1PH - Installing the Product - 1

natural_image Technical line drawing of an industrial control room layout with equipment and storage unit (no text or symbols)

Figure 3-67: Connect SMU B+ and Module #10 B+.

  1. Reattach Battery Module #10's front cover and SMU B+ terminal cover.

APC LIBSMG95OUL1PH - Installing the Product - 2

natural_image Technical line drawings of industrial control panels and equipment, showing internal components and assembly (no text or symbols)

Figure 3-68: Reattach Battery Module #10's Front Cover and SMU B+ Terminal Cover

3.10.6 Module and SMU Signal Cable Connection

Connect the signal cables for SMU and Module BMS's for each module.

APC LIBSMG95OUL1PH - Module and SMU Signal Cable Connection - 1

NOTICE

- Use the proper signal cables as specified by the part numbers below.

APC LIBSMG95OUL1PH - NOTICE - 1

WARNING

Rack BMS / Module BMS Damage

Do not insert both ends of the signal cable WIRE ASSY MODULE TO MODULE #1 or WIRE ASSY MODULE TO MODULE #2 into the same Battery Module.

  1. Connect the signal cable "WIRE ASSY RACK TO MODULE" between the SMU "MODULE" connector and Module #1 "Right Connector".

APC LIBSMG95OUL1PH - WARNING - 1

text_image Technical diagram showing internal components of a computer system with an inset view highlighting a specific device.

Figure 3-69: SMU to Module #1 Signal Cable

3. Installing the Product

  1. Connect the signal cable "WIRE ASSY MODULE TO MODULE #1" from Module #1 "Left Connector" to Module #2 "Right Connector."

APC LIBSMG95OUL1PH - Installing the Product - 1

text_image Technical diagram showing two views of a device layout with labeled components and an inset view of the internal structure.

Figure 3-70: Module #1 to Module #2 Signal Cabling

  1. Connect the signal cable "WIRE ASSY MODULE TO MODULE #1" from Module #2 "Left Connector" to Module #3 "Right Connector."

APC LIBSMG95OUL1PH - Installing the Product - 2

natural_image Technical line drawing of a dual-chamber electrical enclosure with internal components and wiring, shown in two orthogonal views (no text or labels)

Figure 3-71: Module #2 to Module #3 Signal Cabling

3. Installing the Product

  1. Connect the signal cable "WIRE ASSY MODULE TO MODULE #1" from Module #3 "Left Connector" to Module #4 "Right Connector."

APC LIBSMG95OUL1PH - Installing the Product - 1

text_image Technical diagram showing two views of an electrical enclosure with labeled components and a zoomed-in view of the enclosure's internal structure.

Figure 3-72: Module #3 to Module #4 Signal Cabling

  1. Connect the signal cable "WIRE ASSY MODULE TO MODULE #1" from Module #4 "Left Connector" to Module #5 "Right Connector."

APC LIBSMG95OUL1PH - Installing the Product - 2

text_image Technical diagram showing two views of a server rack unit with labeled internal components and an orange cable connection.

Figure 3-73: Module #4 to Module #5 Signal Cabling

3. Installing the Product

  1. Connect the signal cable "WIRE ASSY MODULE TO MODULE #2" from Module #5 "Left Connector" to Module #6 "Right Connector".

APC LIBSMG95OUL1PH - Installing the Product - 1

natural_image Technical line drawing of a dual-chamber electrical enclosure with wiring, shown from an exploded view (no text or symbols present)

Figure 3-74: Module #5 to Module #6 Signal Cabling

  1. Connect the signal cable "WIRE ASSY MODULE TO MODULE #1" from Module #6 "Left Connector" to Module #7 "Right Connector."

APC LIBSMG95OUL1PH - Installing the Product - 2

text_image Technical diagram showing two views of an electrical panel with labeled components and a magnified inset view.

Figure 3-75: Module #6 to Module #7 Signal Cabling

3. Installing the Product

  1. Connect the signal cable "WIRE ASSY MODULE TO MODULE #1" from Module #7 "Left connector" to Module #8 "Right connector".

APC LIBSMG95OUL1PH - Installing the Product - 1

text_image Technical diagram showing two views of a server rack with labeled components and an inset view of its internal structure.

Figure 3-76: Module #7 to Module #8 Signal Cabling

  1. Connect the signal cable "WIRE ASSY MODULE TO MODULE #1" from Module #8 "Left Connector" to Module #9 "Right Connector."

APC LIBSMG95OUL1PH - Installing the Product - 2

natural_image Technical line drawing of a dual-chamber electrical enclosure with internal components and wiring, shown in two views (no text or symbols)

Figure 3-77: Module #8 to Module #9 Signal Cabling

3. Installing the Product

  1. Connect the signal cable "WIRE ASSY MODULE TO MODULE #1" from Module #9 "Left Connector" to Module #10 "Right Connector." No connection to Module #10 "Left Connector" is needed.

APC LIBSMG95OUL1PH - Installing the Product - 1

text_image Technical diagram showing two rectangular panels with labeled components and a separate 3D schematic view of the same panel layout.

Figure 3-78: Module #9 to Module #10 Signal Cabling

3. Installing the Product

  1. For a multiple rack system, connect the signal cables "WIRE ASSY RACK TO RACK #2" between each rack's SMU. Push the pre-punched hole to pass the cable through a circular hole in the side of the rack frame and through the opening above Module #1 and Module #16.

APC LIBSMG95OUL1PH - Installing the Product - 1

NOTICE

- See the examples for correct signal cable wire connections for both left and right rack alignments.

APC LIBSMG95OUL1PH - NOTICE - 1

natural_image Technical illustration of a multi-level server rack with a cable and mechanical components, showing internal wiring alignment (no text or symbols)

Figure 3-79: Pre-Punched Hole for Signal Cable

3. Installing the Product

Signal Cabling Examples of Left Alignment of Trays (System BMS on the left)

APC LIBSMG95OUL1PH - Installing the Product - 1

text_image DC 3F FAULT CURRENT CAN MODULE DC 3M FAULT CURRENT CAN MODULE DC 3M FAULT CURRENT CAN MODULE DC 3M FAULT CURRENT CAN MODULE DC 3M FAULT CURRENT CAN MODULE

Figure 3-80: Signal Cabling Examples of Left Alignment of SMU

3. Installing the Product

  1. Turn the termination resistor switch on for the last SMU in the CANbus loop.

APC LIBSMG95OUL1PH - Installing the Product - 1

text_image Technical diagram of an electrical cabinet layout with labeled components and a magnified inset showing a red rectangle highlighting the 'ON' symbol.

Figure 3-81: Termination Resistor Setting for Last SMU

APC LIBSMG95OUL1PH - Installing the Product - 2

NOTICE

- Factory-provided cables are adequate for systems with Rack Frames bolted together. Different configurations may require cable length modification.

3. Installing the Product

3.10.7 SMPS Assembly and SMU Power Cable Connection

Connect the SMU DC power cables.

APC LIBSMG95OUL1PH - SMPS Assembly and SMU Power Cable Connection - 1

text_image DC IN POM MCCB DC IN POWER ALAM DC OUT DC OUT TCP/IP DRY CONNECT CAR RAM RAM RAM L1 L2 L3 PE DC OUT DC OUT

Figure 3-82: DC Power Cables from SMPS Assembly 3 Phase Type A to SMU

APC LIBSMG95OUL1PH - SMPS Assembly and SMU Power Cable Connection - 2

text_image DC IN POM TOP IP NET CONTACT CAN NAME SMS CAN DC OUT DC OUT DC OUT DC OUT N1 L2 N2

Figure 3-83: DC Power Cables from SMPS Assembly 1 Phase Type A to SMU

3.10.8 SMPS Assembly and SMU Signal Cable Connection

  1. Connect the signal cable from the SMPS Assembly to SMU "WIRE ASSY RACK TO SYSTEM."

APC LIBSMG95OUL1PH - SMPS Assembly and SMU Signal Cable Connection - 1

text_image RS405 BMS CAN DC 10 PNDT CURRENT POWER ALAM RIGHT CAN MOD L1 L2 L3 PE L1 L2 L3 PE

Figure 3-84: CAN Signal Cable Connection from SMPS Assembly 3 Phase Type A to SMU

  1. Connect the MODBUS TCP/IP Cable ^4 to the SMPS Assembly Type A.

APC LIBSMG95OUL1PH - SMPS Assembly and SMU Signal Cable Connection - 2

text_image TCP / IP TCP/IP DC OUT DC OUT L1 L2 L3 F0 L1 L2 L3 F0

Figure 3-85: TCP/IP Cable Connection to SMPS Assembly

  1. Connect the Dry Contact Cable to SMPS Assembly Type A

3. Installing the Product

APC LIBSMG95OUL1PH - Installing the Product - 1

text_image DRY CONTACT CAT MODULE MOCS TCP/IP DRY CONTACT CAN RESUM DC OUT DC OUT L1 L2 L3 F0 L1 L2 L3 F0

Figure 3-86: Dry Contact Cable Connection to SMPS Assembly

4. Optional: Connect the SMU MCCB Cable.

APC LIBSMG95OUL1PH - Optional: Connect the SMU MCCB Cable. - 1

text_image MCCB DCN MULT CURRENT CAN MOOLE NCB NCB

Figure 3-87: MCCB Extra Auxiliary Connection

3.10.9 SMPS Assembly AC Input Connection

  1. Remove the protective covers from the AC input terminals.

APC LIBSMG95OUL1PH - SMPS Assembly AC Input Connection - 1

natural_image Technical line drawing of an electronic device chassis with ports and connectors (no text or symbols)

Figure 3-88: AC Input Terminals of SMPS Assembly 3 Phase Type A

APC LIBSMG95OUL1PH - SMPS Assembly AC Input Connection - 2

natural_image Technical line drawing of an electronic device rear panel with ports and connectors (no text or symbols)

Figure 3-89: AC Input Terminals of SMPS Assembly 1 Phase Type A

3. Installing the Product

  1. Connect each AC input in the SMPS Assembly. Make sure the AC cables are not energized. ^5

APC LIBSMG95OUL1PH - Installing the Product - 1

text_image DC M FAULT CURRENT CAN MODULE POWER ALARM MCCB TCP/IP OFF CONTACT CAN RS/MS SBB CAN RESET DC OUT DC OUT L1 L2 L3 PE L1 L2 L3 PE DC M FAULT CURRENT CAN MODULE POWER ALARM MCCB TCP/IP OFF CONTACT CAN RS/MS SBB CAN RESET DC OUT DC OUT L1 L2 L3 PE L1 L2 L3 PE

Figure 3-90: SMPS Assembly 3 Phase Type A - AC Input Terminals with Cables Attached
APC LIBSMG95OUL1PH - Installing the Product - 2

text_image DC IN POWER ALARM FIXED CURRENT CAN MODULE MODB TOP IP DIF/CONTACT CAN SBHD SIMS CAN RESET DC OUT DC OUT SIMS USB5 L1 N1 L2 N2

Figure 3-91: SMPS Assembly 1 Phase Type A - AC Input Terminals with Cables Attached

3. Installing the Product

  1. Reattach the protective covers to the AC input.

APC LIBSMG95OUL1PH - Installing the Product - 1

natural_image Technical line drawing of an electronic device rear panel with labeled ports and connectors (no readable text or symbols)

Figure 3-92: AC Input Terminals of SMPS Assembly 3 Phase Type A

APC LIBSMG95OUL1PH - Installing the Product - 2

natural_image Technical line drawing of an electronic device rear panel with ports, connectors, and warning symbols (no readable text or labels)

Figure 3-93: AC Input Terminals of SMPS Assembly 1 Phase Type A

3. Installing the Product

1. Connect the ground cables.

APC LIBSMG95OUL1PH - Connect the ground cables. - 1

natural_image Technical line drawing of a server rack cabinet with visible internal components and wiring (no text or labels)

45 mm Pitch
Between Holes
APC LIBSMG95OUL1PH - Connect the ground cables. - 2

natural_image Technical line drawing of a mechanical assembly with mounting holes and a central rectangular component (no text or symbols)

Figure 3-94: Grounding Points (2 EA)
APC LIBSMG95OUL1PH - Connect the ground cables. - 3

NOTICE

  • Connect the rack ground wire with an M12 screw. Rack ground screws and cables are not factory-provided and must be provided by the installer or customer.
    ■ The fastening torque should be 30Nm (300kgf·cm).

3. Installing the Product

  1. Connect the DC link high-voltage terminals from the UPS.
CAUTION
Verify with a voltmeter that no power is present on the system. Disconnect all input power supplies. Use lock out/tag out procedures to secure the UPS and battery system before beginning this step. In this step, the battery and UPS are isolated by the SMU because the circuit breaker in the SMU is opened.
NOTICE

APC LIBSMG95OUL1PH - Installing the Product - 1

text_image Technical diagram of an electronic device with labeled components and two circular insets showing P+ and P- states.

Figure 3-95: Connecting the DC Link High Current Terminals

  1. Special case: if connecting the battery system in three-wire system, connect two racks to the three-wire DC bus connection according to the diagram below. System BMS must be configured to operate correctly with this connection.

3. Installing the Product

APC LIBSMG95OUL1PH - Installing the Product - 1

text_image P+ N P- OFF ON OFF ON

After installation is complete, check the following:

  • Bolt fastening condition
  • Screw fastening torque by sampling
    • High-voltage cable connection
  • Module connections
  • SMU connections

3.10.11 AC Input Commissioning

When the installation of the battery system is complete, SMPS Assembly's AC inputs must be powered to turn the BMS on.

3. Installing the Product

3.10.12 BMS Configuration

APC LIBSMG95OUL1PH - BMS Configuration - 1

NOTICE

- It is recommended that the configuration of the Rack BMS and System BMS be done by experienced service personnel. Incorrect configuration of the Rack BMS and System BMS will cause communication failure.

This section has been removed from the customer facing copy of the installation manual.

3.10.13 Communication Check

This section has been removed from the customer facing copy of the installation manual.

3. Installing the Product

3.10.14 Reinstall the Front Door

  1. Reinstall the front door to cover the battery rack and prevent further access to high voltage parts of the SMU and SMPS Assembly.

  2. Align the hinges on the rack frame and front door and slide the door down.

APC LIBSMG95OUL1PH - Reinstall the Front Door - 1

natural_image Technical diagram of a server rack with an open panel and internal components, showing a zoomed-in view (no text or symbols present)

Figure 3-96: Reattaching the Front Door

  1. Reattach the earth cable from the rack frame to the front door.

APC LIBSMG95OUL1PH - Reinstall the Front Door - 2

natural_image Technical diagram of a server rack with an inset showing internal components and connection (no text or labels)

Figure 3-97: Reattaching the earth cable.

  1. Close and lock the front door using the provided key. Do not misplace the key.

3. Installing the Product

3.10.15 Reinstall the Front Panel

  1. Reinstall the front panel to cover the battery rack and prevent further access to high voltage parts of the battery modules.
  2. Locate the hooks that hold the front panel to the slots in the rack frame and insert the front panel to the rack frame. Make sure all the hooks are inserted to the slot and the panel is flush with the rack frame before screwing.

APC LIBSMG95OUL1PH - Reinstall the Front Panel - 1

natural_image Technical line drawing of a server rack with a magnified inset showing internal components (no text or symbols)

Figure 3-98: Front panel hooks (four)

  1. Screw in the front panel using the provided M5 screws for each front panel. Fasten the screws using torque of 5.1–6.1 Nm (50–60 kgf/cm)

APC LIBSMG95OUL1PH - Reinstall the Front Panel - 2

natural_image Technical line drawing of a server rack unit with ventilation grilles and a magnified inset showing internal components (no text or symbols)

Figure 3-99: Front panel screws (eight)

3.10.16 Switching on the MCCB

After powering on the battery system's SMPS Assembly and SMU, and configuring the System BMS and the Rack BMS according to the installation, check the indicator LED to determine whether the system status is normal. Refer to the "Product Specification" and "Operation and Maintenance Manual" for information on the indicator LED.

APC LIBSMG95OUL1PH - Switching on the MCCB - 1

CAUTION

- Follow the instruction and guidelines for the UPS on connecting the battery to the UPS before switching on the MCCB.

The MCCB in the SMU should be in the "TRIP" position during installation.

APC LIBSMG95OUL1PH - CAUTION - 1

text_image OFF ON

Figure 3-100: MCCB Handle in Trip Position

Shift the handle of the MCCB to "OFF."

APC LIBSMG95OUL1PH - CAUTION - 2

text_image OFF ON

Figure 3-101: MCCB Handle in Off Position

Then shift the handle to "ON" to connect the battery system to the UPS DC link.

APC LIBSMG95OUL1PH - CAUTION - 3

text_image OFF ON

Figure 3-102: MCCB Handle in On Position

Memo

Memo

Memo

www.SamsungSDI.com

Table of contents Click a title to access it
Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : APC

Model : LIBSMG95OUL1PH

Category : Inverter