INFOCUS M2 4G - Smartphone

M2 4G - Smartphone INFOCUS - Free user manual and instructions

Find the device manual for free M2 4G INFOCUS in PDF.

📄 24 pages English EN Download 💬 AI Question 10 questions ⚙️ Specs
Notice INFOCUS M2 4G - page 5
Pick your language and provide your email: we'll send you a specifically translated version.
Product Type Smartphone
Brand InFocus
Model M2 4G
Network 4G LTE, 3G, 2G (GSM); SIM1 supports 3G/4G data, SIM2 voice only
SIM Card Dual SIM (Micro-SIM, Nano-SIM with adapter)
Operating System Android
Display Touchscreen (size not specified)
Rear Camera Yes
Front Camera Yes
Connectivity WLAN (Wi-Fi), Bluetooth
Battery Removable (capacity not specified)
Charging USB 2.0 (or higher), AC adapter
SAR Value 1.310 W/kg (head), 0.713 W/kg (body)
Safety Overheat protection, do not disassemble, avoid liquids
Cleaning Soft cloth, no abrasives or cleaning solutions
Warranty 12 months device, 6 months battery
Audio Speaker, microphone, 3.5 mm headphone jack (assumed)

Frequently Asked Questions - M2 4G INFOCUS

How do I install the SIM card(s) and memory card?
Place the phone face down, remove the bottom cover from the slot on the lower-left corner. Insert the SIM card(s) into the slot(s) as illustrated. For memory card, insert it with golden connectors facing up. Replace the cover and press along the edges.
How do I charge the battery?
Connect the smaller end of the USB cable to the phone, the other end to a USB charger or laptop. Plug the AC adapter into a wall outlet. Charge only indoors in dry environments. The device has overheat protection; if too hot, charging stops automatically.
How do I make a call with two SIM cards?
From the Home screen, tap the phone icon. Enter the number on the keypad. Before tapping the call button, select the desired SIM network if you have two SIM cards inserted. Tap the call button to dial.
How do I set up Wi-Fi?
From the Home screen, tap Settings. Under WIRELESS & NETWORKS, tap WLAN and turn it on. Available networks are listed. Tap a network to connect; if secured, enter the password and tap Connect.
How do I set an alarm?
From the Home screen, open the Tools folder and tap the clock app. Tap the alarm tab, then tap the + icon to add a new alarm. Set the time by sliding the pointer, tap Done. You can set repeat mode, ringtone, and vibrate options.
How do I adjust the volume?
There are two ways: press the volume (+/-) button repeatedly to adjust, or press the volume button once and drag the slider on the screen.
What should I do if the phone freezes or does not respond?
Press and hold the Power button for 8 seconds to force shutdown. If you hold it for 2 more seconds, it will restart. This can resolve temporary unresponsiveness.
How do I clean the touch screen?
Use a soft cloth. If needed, dampen the cloth slightly before cleaning. Never use abrasives or cleaning solutions.
What are the SAR values for this device?
The highest SAR value under ICNIRP guidelines is 1.310 W/kg for head and 0.713 W/kg for body (measured at 1.5 cm distance). The device meets international exposure limits.
Can I use the phone while driving?
Do not use hand-held phones while driving. Use a hands-free system (headphone, headset) with a low power Bluetooth emitter as an alternative for safety.

User questions about M2 4G INFOCUS

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Smartphone in PDF format for free! Find your manual M2 4G - INFOCUS and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. M2 4G by INFOCUS.

USER MANUAL M2 4G INFOCUS

Thank you for choosing InFocus M2 phone. It is recommended that you first read this Quick Start Guide to understand the basic operation of the phone.

Content

Your Phone 2

Installing SIM Card(s) and Memory Card .. 3

Charging the Battery 4

Initial Start Up 4

Home Screen 4

Making Your First Call 5

Contacts 6

Sending a Text Message 7

Setting up WLAN 7

Setting up Email Account 8

Sending and Receiving Emails 8

Using Browser 9

Using Bluetooth 10

Taking Photos and Videos 10

Viewing Photos and Videos 12

Basic Phone Settings 13

Your Phone
Front camera Earpiece Power button Headset jack Microphone Flash LED Light Indicator Volume (+/-) button Touch screen InFocus InFocus Speaker Microphone Micro USB port

Installing SIM Card(s) and Memory Card

  1. Place your phone face down on a flat surface.
  2. Starting from the slot on the lower-left corner, release the latches on the bottom cover and remove the cover.
  3. Insert the SIM card(s) into the slot(s) as illustrated.

NOTE:

• To remove the SIM card, push the SIM card firmly into the slot first to eject it, then pull it out.

INFOCUS M2 4G - NOTE: - 1

natural_image 3D illustration of a smartphone with a black arrow pointing to its side (no text or symbols)

INFOCUS M2 4G - NOTE: - 2

natural_image Diagram of a smartphone with two ports and directional arrows indicating movement or flow (no text or symbols present)

INFOCUS M2 4G - NOTE: - 3

natural_image Diagram of a smartphone with internal components and directional arrows indicating movement (no text or symbols)
  • When using the card adapter (Nano SIM -> Micro SIM), do not use excessive force to remove the SIM card as this can damage the card.
  • The SIM1 supports 3G and 4G data network. However, the SIM2 only supports voice call.

  • Insert the memory card into the slot with golden connectors facing up.

INFOCUS M2 4G - NOTE: - 4

natural_image Diagram of a smartphone showing internal components and a close-up of the device's internal structure (no text or symbols)
  1. Replace the bottom cover and press along the edges until you have a secure seal.

INFOCUS M2 4G - NOTE: - 5

natural_image 3D diagram of a rectangular plate with multiple small black pins and a central slot, no text or symbols present.

Charging the Battery

Before using the phone, it is recommended to fully charge the battery first.

  1. Connect the smaller end of the USB cable to the USB port of the device.
  2. Connect the other end of the cable to the USB charger or other USB port with power source (for example, laptop).
  3. Plug the AC adapter to a wall outlet to start charging.

Warning

  • Charge only indoors and in dry environments.
  • For safety, the overheat protection will be active during charging. If the system temperature reaches above the maximum level, the device will automatically stop charging. The device will only resume charging when normal operating temperature is reached.
  • If there is no response after you press the Power button or touch the panel, press and hold the Power button for 8 seconds to force shutdown. If you hold the Power button for 2 seconds more, it will restart.

INFOCUS M2 4G - Warning - 1

Initial Start Up

After installing the SIM card(s) and charging the battery, the device is ready to be used.

Home Screen

From the Home screen, you can quickly access common features and view notifications of missed calls, received messages, check battery and connection status. Swipe your finger to the left or right to access the applications installed on the device.

Google Play Store Search Histogram Session

Making Your First Call

From the Home screen, tap

INFOCUS M2 4G - Making Your First Call - 1

To make a call

  1. Enter the phone number on the keypad.
  2. Tap to correct any number. Tap and hold to erase the entire number.
  3. Tap to make a call.
  4. To end the call, tap

INFOCUS M2 4G - To make a call - 1

NOTE: If you have inserted two SIM cards, select the desired SIM network.

Contacts Add to contacts 1 go 2 ANC 3 DEP 4 GSH 5 JL 6 MNC 7 PGNL 8 TLW 9 WXXZ * 0 #

To receive a call

To answer a call, tap and drag it to the right (☐).

INCOMING CALL Search out with email

NOTE: When you tap, it automatically changes to.

INFOCUS M2 4G - To receive a call - 2

Contacts

Adding contacts

  1. From the Home screen, tap
  2. Tap to add a contact.
  3. Select one of the location to store the contact to.
  4. Enter the contact information such as name, phone number, email address, etc.
  5. Tap Done to save the contact.

INFOCUS M2 4G - Adding contacts - 1

Phone-only, unprepared Phone Name Add organization Phone: Phone: www.n Email: email: Zip code: wpsej Style: City: Neighborhood:

Importing contacts

  1. From the Home screen, tap .
  2. Tap : Import/export, and choose one of the Import options.
  3. Select the contacts location that you want to copy to.
  4. Select the contacts to copy and tap Done.

INFOCUS M2 4G - Importing contacts - 1

Done I selected Alice Chen Sandra Lin

Sending a Text Message

  1. From the Home screen, tap
  2. Tap .

NOTE: If you have inserted two SIM cards, select the desired SIM network first before tapping 🔒.

  1. In the To field, enter the recipient's phone number or name.
  2. Compose your message.
  3. Tap to send your message.

ap . New message No. Type message

Setting up WLAN

  1. From the Home screen, tap
  2. In WIRELESS & NETWORKS, tap WLAN and turn it to on.
  3. Available networks are listed. Tap a network to connect to or tap to manually add a connection.

NOTE: Connecting to a secured network will prompt for a password. Enter the password, then tap Connect.

WLAN PTSGI-MS Downloaded HP-Print T1-Officerjet 6700 Die-505 Connected with WPGI-PPGSI (WPG password)

Setting up Email Account

  1. From the Home screen, tap □.

  2. Enter your email address and password. Then tap Next.

  3. Set the Inbox checking frequencysettings and tap Next.

  4. Enter Name and Account display name.

  5. Tap Next. Once the account setup is complete, the device will automatically retrieve your emails.

Account setup You can set up your account in just a few steps. Email address Password

Sending and Receiving Emails Composing and sending emails

  1. From the Home screen, tap .

NOTE: If you have more than one email account, select an email account that you want to access.

  1. Tap

  2. In the To field, enter the recipient's email address.

  3. Tap Subject and type a subject.

  4. Compose your email.

  5. Tap to send email.

ap . 3G 56 58 11:00 Compose User To Subject Send from my InFocus M2 your

Receiving emails

Emails are automatically received in the Inbox folder when the device connects to a network. To manually retrieve new emails, swipe down to refresh or tap :> Refresh.

3G 24 54 00:54 F Facebook You have more friends on Facebook than you think - The second way is that job at... F Facebook You have more friends on Facebook than you think - The second way is that job at... Jack Interesting at Spain - Choose AFB membership at Spain's home Jack Flower photos - Hi price coins

Using Browser

To open a web page

  1. From the Home screen, tap .
  2. Tap the address bar.
  3. Type the URL then tap Go.
  4. Tap to access more functions.

INFOCUS M2 4G - To open a web page - 1

http://www.google.com/fgw WBS Images Sign On Google * Location unavailable Settings Like Google.com/Go Polyprop & Tereos

Using Bluetooth

  1. From the Home screen, tap
  2. In WIRELESS & NETWORKS, tap Bluetooth and turn it to on.
  3. Available devices are listed. To search for a new device, tap SEARCH FOR DEVICES.
  4. Tap a detected device.
  5. To start pairing, enter the PIN then tap OK. NOTE:
  6. The PIN of the device must be the same PIN on the other bluetooth device.
  7. On some devices, tap Pairto start pairing.
  8. The paired bluetooth device name is displayed.

INFOCUS M2 4G - Using Bluetooth - 1

Taking Photos and Videos

This device is equipped with rear and front cameras to take photos and videos.

  1. From the Home screen, tap .

NOTE: To switch between front and rear cameras, tap .

  1. Aim the device at the subject.

  2. Pinch the screen to zoom in or out.

  3. Tap to change the flash mode.

  4. Tap to take the shot.

INFOCUS M2 4G - Taking Photos and Videos - 1

natural_image Person standing in a grassy field with mountainous background, no visible text or symbols

To record a video

  1. From the Home screen, tap

INFOCUS M2 4G - To record a video - 1

  1. Aim the device at the subject.

  2. Tap to start recording.

  3. Tap to stop recording.

INFOCUS M2 4G - To record a video - 2

natural_image Person standing in a grassy field with mountainous background, no visible text or symbols

To take a panorama shot

  1. From the Home screen, tap

INFOCUS M2 4G - To take a panorama shot - 1

  1. Tap and select Panorama.

  2. Aim the device at the subject.

  3. Tap to take the shot.

  4. Move the device slowly toward the direction shown on the screen.

INFOCUS M2 4G - To take a panorama shot - 2

natural_image Sunset over a calm lake with silhouetted hills and a stone arch bridge (no text or symbols visible)
  1. When the shooting guide reaches the end point, the shooting ends. You can also manually stop recording by tapping .

Viewing Photos and Videos

  1. From the Home screen, tap

  2. Tap a folder to view the recorded files in thumbnails.

  3. Tap an image or a video to view in full screen.

  4. Swipe your finger to the left/right to view the previous/next file.

• To delete the photo, tap and then tap OK.

• To play the video, tap 🏠.

• To upload the file to the cloud storage, tap 🔒 and tap login to access to your account.

• To play the slideshow, edit an image, share the photo, or show more options, tap

INFOCUS M2 4G - Viewing Photos and Videos - 1

natural_image Digital photo of a globe with a curved line, displayed in a mobile app interface (no readable text or symbols on the globe itself)

Basic Phone Settings

Adjusting the volume

There are two ways to adjust the volume:

- Press the volume (+/-) button repeatedly to adjust the volume.

- Press the volume button once. Drag the volume slider to adjust the volume.

Logoph Play Store Email Unusualing Image

Setting an alarm

  1. From the Home screen, select Tools folder and tap ▼.

  2. Tap.

  3. To add an alarm, tap . +

  4. To set the time, slide the pointer, and tap Done.

  5. To set repeat mode, check REPEAT and select the desired week days.

  6. To set the ringtone, tap, and select the alarm sound.

  7. To vibrant when the alarm sounds, check VIBRATE.

  8. To enter an alarm label, tap OK. Label and tap OK.

NOTE: By default the alarm is set on.

Changing the layer mode

  1. From the Home screen, tap ≡.
  2. Tap . The Launcher+ page opens.
  3. Tap Layer mode setting tab.
  4. Choose One layer or Two layers.

Layer mode settings One layer Two layers Cancel

The result is displayed as follows:
One layer
Google Play Start Email Microsoft Google

Twolayers
Google Play Store Email Messaging Tools

Important Safety Information

Please read before proceeding

  • DO NOT place objects on top of the device, as they may scratch the screen.
  • DO NOT drop your device or subject it to severe impacts. Bending the body and pushing the display or keys with extreme force could damage the device.
  • DO NOT use a pen or any sharp object to tap the screen.
  • DO NOT expose the device to dirty or dusty environments.
  • DO NOT place the device on an uneven or unstable surface.
  • DO NOT insert any foreign objects into the device.
  • DO NOT expose the device to strong magnetic or electrical field.
  • DO NOT use or store this equipment in a place where it will be exposed to high temperatures, such as near an open flame or heat-emitting equipment.
  • DO NOT use it or store it where fluids such as water can splash onto it. Raindrops, water spray, juice, coffee, steam, or other types of liquids will also cause malfunctions.
  • Using this device for long periods of time may cause the device to get warm. If you feel the device is too warm, avoid sustained contact with exposed skin otherwise this might cause discomfort, or eventually a burn.

  • Refer to the rating label on the device and be sure that the power adapter complies with the rating. Only use accessories specified by the manufacturer.

  • Disconnect the device from an electrical outlet and power off before cleaning the device.
  • NEVER attempt to connect or disconnect the power adapter with wet hands.
  • Clean the touch screen with a soft cloth. If needed, dampen the cloth slightly before cleaning. Never use abrasives or cleaning solutions.
  • DO NOT disassemble the device. Only a certified service technician should perform repair.
  • Please check with your Local Authority or retailer for proper disposal of electronic products.
  • For USB connection, users must use a USB 2.0 (or higher version) cable.
  • The adapter shall be installed near the equipment and shall be easily accessible.

- The temperature of the device might increase while the CPU is busy handling resource consuming activities such as high resolution video decoding. The SW protection mechanism will ensure stop charging whenever the temperature is over the predefined threshold and prepare for shut down if necessary. Please worry not.

Safety Precautions for Battery Use

  • Keep the battery dry and away from any liquid since this may cause a short circuit.
  • Keep the battery away from metal objects since this may cause a short circuit.
  • Do not use damaged or deformed batteries.
  • If the battery emits a foul odor, discontinue use.
  • Keep the battery away from babies and small children.
  • If the battery leaks:

  • Do not allow the leaking fluid to come in contact with your skin, eyes or clothing. If already in contact, rinse with clean water immediately and seek medical advice.

  • Keep the battery away from fire since this may cause the battery to explode.

- Do not attempt to open or service the battery yourself.

- Do not dispose battery in fire or water.

- Recycle or dispose used batteries according to the local regulations.

INFOCUS M2 4G - Safety Precautions for Battery Use - 1
廢電池轉回收

Road and Environmental Safety

  • Turn off the phone in areas with a potentially explosive atmosphere or where flammable objects exist such as gas stations, fuel depots, and chemical plants among others. Sparks from these areas could cause explosion or fire and result in injury or even death.
  • Do not use hand-held phones while driving a vehicle. Use hands-free devices as an alternative.

Safety in Aircraft

Do not use the phone on board an aircraft. The phone's network signals may cause interference to the navigation system. As a safety measurement, it is against the law in most countries to use the phone on board an aircraft.

Copyright © InFocus Corporation, 2014. All rights reserved.

This product has an Android ^™ platform based on Linux, which can be expanded by a variety of JME-based application SW.

Google、Google Play、Android and other marks are trademarks of Google Inc.

microSD ^™ is a trademark of SD Card Association.

Bluetooth and the Bluetooth logo are trademarks owned by Bluetooth SIG, Inc.

INFOCUS M2 4G - Copyright Information - 1

All products use in this device and trademarks mentioned herein are trademarks or registered trademarks of their respective owners.

Intellectual Property Right Information

Right to all technologies and products that comprise this device are the property of their respective owners:

This product has an Android ^™ platform based on Linux, which can be expanded by a variety of Java-Script-based application SW.

a) Use a wireless hands-free system (headphone, headset) with a low power Bluetooth emitter.
b) Make sure the cell phone has a low SAR.
c) Keep your calls short or send a text message (SMS) instead. This advice applies especially to children, adolescents and pregnant women.
d) Use cell-phone when the signal quality is good.
e) People having active medical implants should preferably keep the cell phone at least 15 cm away from the implant.

Compliance Information

SAR Information

THIS MOBILE DEVICE MEETS GUIDELINES FOR EXPOSURE TO RADIO WAVES. Your mobile device is a radio transmitter and receiver. It is designed not to exceed the limits for exposure to radio waves recommended by international guidelines. These guidelines were developed by the independent scientific organization ICNIRP and include safety margins designed to assure the protection of all persons, regardless of age and health.

The exposure guidelines for mobile devices employ a unit of measurement known as the Specific Absorption Rate or SAR. The SAR limit stated in the ICNIRP guidelines is 2.0 W/kg averaged over 10 grams of tissue. Tests for SAR are conducted using standard operating positions with the device transmitting at its highest certified power level in all tested frequency bands. The actual SAR level of an operating device can be below the maximum value because the device is designed to use only the power required to reach the network. That amount changes depending on a number of factors such as how close you are to a network base station. The highest SAR value under the ICNIRP guidelines for use of the device at the ear is 1.310 W/kg and at the body is 0.713 W/kg (The measure distance of 1.5 cm). Use of device accessories and enhancements may result in different SAR values. SAR values may vary depending on national reporting and testing requirements and the network band.

WEEE Notice

The WEEE logo on the product or on its box indicates that this product must not be disposed of or dumped with your other household waste. You are liable to dispose of all your electronic or electrical waste equipment by relocating over to the specified collection point for recycling of such hazardous waste. Isolated collection and proper recovery of your electronic and electrical waste equipment at the time of disposal will allow us to help conserve natural resources. Moreover, proper recycling of the electronic and electrical waste equipment will ensure safety of human health and environment. For more information about electronic and electrical waste equipment disposal, recovery, and collection points, please contact your local city center, household waste disposal service, shop from where you purchased the equipment, or manufacturer of the equipment.

RoHS Compliance

This product is in compliance with DIRECTIVE 2011/65/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 8 June 2011, on the restriction of the use of certain hazardous substances in electrical and electronic equipment and its amendments.

European Union Regulatory Conformance

The equipment complies with the RF Exposure Requirement 1999/519/EC, Council Recommendation of 12 July 1999 on the limitation of exposure of the general public to electromagnetic fields (0–300 GHz). This equipment meets the following conformance standards: EN50360, EN62209-1/-2, EN62311, EN62479, EN60950-1, EN50332-2, EN301489-1/-3/-7/-17/-24, EN55022, EN55024, EN61000-3-2/-3-3, EN301511, EN301908-1/2/-13, EN300328, EN505EN3EN84566/2,

For the device which tests accordance to EN60950-1:2006, it is mandatory to perform audio tests for EN50332.

This device have been tested to comply with the Sound Pressure Level requirement laid down in the applicable EN 50332-1 and/or EN 50332-2 standards. Permanent hearing loss may occur if earphones or headphones are used at high volume for prolonged periods of time.

Prevention of Hearing Loss

Warning statement requirement under EN 60950-1:A12.

INFOCUS M2 4G - Prevention of Hearing Loss - 1

To prevent hearing damage, do not listen at high volume levels for long periods.

Note: For France, headphones/earphones for this device are compliant with the sound pressure level requirement laid down in the applicable EN50332-1:2000 and/or EN50332-2:2003 standard as required by French Article L.5232-1.

INFOCUS M2 4G - Prevention of Hearing Loss - 2

The conformity assessment procedure has been followed with the involvement of the following Notified Body: Cetecom TESTLAB

Identification mark: CE0682

(Notified Body) CE

C€0682

Changes or modifications to this product not authorized by the manufacturer could void the EMC compliance and negate your authority to operate the product. This product has demonstrated EMC compliance under conditions that included the use of compliant peripheral devices and shielded cables between system components. It is important that you use compliant peripheral devices and shielded cables between system components to reduce the possibility of causing interference to radios, televisions, and other electronic devices.

We, hereby, declare that this Smartphone is in compliance with the essential requirements and other relevant provisions of Directive 1999/5/EC.

DFS controls related to radar detection shall not be accessible to the user.

Warranty Statement

Limited warranty

InFocus provides "Product Warranty Statement", at the time of its original purchase, from the InFocus or its authorized distributor, describing the product warranty service.

Notes: InFocus does not provide global cross border warranty.

This limited warranty (free of defects in materials and workmanship causing malfunction and defective) shall last for twelve (12) months for the device and six (6) months for the battery from the purchase date. Other than battery, the in-box accessories, including cosmetic parts, button, cables, earphone, AC ... etc. if applied; six (6) month open-box functional failure warranty is provided. The customer shall present the PROOF OF PURCHASE upon claiming the warranty. Throughout the warranty period InFocus or its authorized agent will, at own discretion and subject to section Non-Warranty below repair or replace a defective product. All replaced defective parts or components will become the property of InFocus after returning the repaired/replaced product in good working condition. This repair on the same symptom, one (1) month repair warranty is provided.

Non-Warranty

No warranty may be asserted or claimed if (1) the product serial number, date code, IMEI, water indicator or the warranty seal has been removed, erased, defaced or altered; or (2) the defect is found to be caused by:

(1) By engineering judgement, the product is mishandled/misused carelessly or accidentally. Unauthorized disassembling or repair, repair by use if unauthorized spare parts, or other actions beyond the reasonable control of InFocus.
(2) Improper shipping and packing.
(3) Forces of nature of willful misconduct.

(4) Rough handling, exposure to moisture, dampness or extreme thermal or environmental conditions or a rapid change in such conditions, corrosion, oxidation, unauthorized modifications or connections.
(5) Deterioration of the product due to normal wear and tear. Products installed or integrated with software or applications which are not made or authorized by InFocus.

Be sure to back up data and remove any confidential, proprietary or personal information from the product when asking service. InFocus is not responsible for the damage to or loss of any programs, data, or removable storage media inside or sent with the products. As to Non-warranty product, InFocus will check if a repair is economical/available and provide a chargeable service to customer's consideration.

IN NO EVENT SHALL InFocus BE LIABLE UNDER THIS LIMITED WARRANTY FOR LOSS OF PROFIT. LOSS OF ANTICIPATED SAVINGS, LOSS OF DATA OR INDIRECT LOSS, LOSS OF THE PRODUCT OR ANY ASSOCIATED EQUIPMENT, INCIDENTAL OR CONSEQUENTIAL LOSSES OR DAMAGES OF ANY NATURE WHATSOEVER TO THE FULLEST EXTENT THAT THOSE LOSSES OR DAMAGES CAN BE DISCLAIMED BY LAW.

INFOCUS M2 4G - Non-Warranty - 1

Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : INFOCUS

Model : M2 4G

Category : Smartphone