Edimax IC-3110P - Security Camera

IC-3110P - Security Camera Edimax - Free user manual and instructions

Find the device manual for free IC-3110P Edimax in PDF.

📄 148 pages English EN Download 💬 AI Question 10 questions ⚙️ Specs
Notice Edimax IC-3110P - page 5
Pick your language and provide your email: we'll send you a specifically translated version.
Product Type PoE IP Security Camera
Dimensions (W x D x H) 70 x 70 x 120 mm
Weight 300 g
Power Supply PoE (IEEE 802.3af) or DC 12V
Image Sensor 1/4" CMOS
Resolution 1.3 Megapixels (1280 x 1024)
Night Vision IR LEDs, up to 10m range
Lens Fixed, 3.6mm
Field of View 60° horizontal
Audio Two-way audio (built-in mic and speaker)
Video Compression H.264, MJPEG
Storage MicroSD card slot (up to 32 GB)
Network Interface 10/100 Ethernet (RJ45)
Protocols TCP/IP, HTTP, SMTP, FTP, DHCP, DDNS
Motion Detection Yes, with email alerts
Security Password protection, IP filtering, SSL encryption
Weatherproof Rating IP65 (indoor/outdoor)
Operating Temperature -20°C to 50°C
Mounting Wall or ceiling mount included
Included Accessories Power adapter, mounting bracket, screws, Ethernet cable, quick start guide
Compatible OS Windows, Mac, Linux
Mobile App Edimax Wi-Fi Guard (iOS/Android)
Cleaning Instructions Wipe with a soft, dry cloth. Do not use liquids.
Spare Parts / Repairability Contact Edimax support for spare parts; not user serviceable.

Frequently Asked Questions - IC-3110P Edimax

How do I reset the Edimax IC-3110P to factory defaults?
Press and hold the reset button on the back of the camera for about 10 seconds until the LED indicator flashes rapidly. The camera will reboot and restore factory settings.
Can I use the IC-3110P outdoors?
Yes, the camera has an IP65 weatherproof rating, making it suitable for outdoor use. Ensure the Ethernet/PoE connection is properly sealed.
How do I set up the camera for the first time?
Connect the camera to your network via Ethernet using PoE or the included power adapter. Use the Edimax Wi-Fi Guard app or the web interface to discover and configure the camera.
Does the IC-3110P support night vision?
Yes, it has built-in infrared LEDs with a range of up to 10 meters for clear night vision.
Can I record video directly to the camera?
Yes, insert a microSD card (up to 32 GB) into the slot to enable local recording. You can also set up continuous or motion-triggered recording.
How do I access the camera remotely?
Use the Edimax Wi-Fi Guard app on your smartphone or log in to the camera's web interface via a browser. Ensure DDNS is configured if your public IP changes.
What is the default username and password?
The default username is admin and the default password is 1234. We strongly recommend changing the password after first login.
Why is my camera not showing video?
Check that the camera is powered and connected to the same network as your viewing device. Verify that PoE or power adapter is working. Also ensure that your router's firewall is not blocking the camera.
Can I use the camera with third-party NVR software?
Yes, the camera supports standard protocols like ONVIF, allowing integration with many third-party NVR systems.
How do I clean the camera lens?
Use a soft, dry microfiber cloth to gently wipe the lens. Avoid using any liquids or abrasive materials. For the housing, a slightly damp cloth can be used.

User questions about IC-3110P Edimax

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Security Camera in PDF format for free! Find your manual IC-3110P - Edimax and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. IC-3110P by Edimax.

USER MANUAL IC-3110P Edimax

IC-3110 / IC-3110W / IC-3110P

User Manual

04-2012 / v1.0

Copyright © Edimax Technology Co., Ltd. all rights reserved. No part of this publication may be reproduced, transmitted, transcribed, stored in a retrieval system, or translated into any language or computer language, in any form or by any means, electronic, mechanical, magnetic, optical, chemical, manual or otherwise, without the prior written permission from Edimax Technology Co., Ltd.

Edimax Technology Co., Ltd. makes no representations or warranties, either expressed or implied, with respect to the contents hereof and specifically disclaims any warranties, merchantability, or fitness for any particular purpose. Any software described in this manual is sold or licensed as is. Should the programs prove defective following their purchase, the buyer (and not this company, its distributor, or its dealer) assumes the entire cost of all necessary servicing, repair, and any incidental or consequential damages resulting from any defect in the software. Edimax Technology Co., Ltd. reserves the right to revise this publication and to make changes from time to time in the contents hereof without the obligation to notify any person of such revision or changes.

The product you have purchased and the setup screen may appear slightly different from those shown in this QIG. For more information about this product, please refer to the user manual on the CD-ROM. The software and specifications are subject to change without notice. Please visit our website www.edimax.com for updates. All brand and product names mentioned in this manual are trademarks and/or registered trademarks of their respective holders.

Notice According to GNU General Public License Version 2

This product includes software that is subject to the GNU General Public License version 2. The program is free software and distributed without any warranty of the author. We offer, valid for at least three years, to give you, for a charge no more than the costs of physically performing source distribution, a complete machine-readable copy of the corresponding source code.

The GNU GPL and GNU LGPL software codes used in Edimax products are distributed without any warranty and are subject to the copyrights of their respective authors. The firmware files for this product can be found under the “Download” page at the Edimax website (www.edimax.com).

Table of Contents

Chapter I: Familiar with your Internet Network Camera....4

1.1 Package Contents ....4

1.2 Basic Introduction....5

1.3 Product Highlights ....6

1.4 Key Components....7

1.5 Descriptions for LED Indicators....11

1.6 Camera Installation .... 12

1.7 Locate the IP Address of this Network Camera....13

1.8 Using the Camera Admin Software to Locate the Camera....17

2.1 Camera Settings....29

2.1.1 MJPEG....33

2.1.2 MPEG4 34

2.1.3 H.264....35

2.1.4 OSD....36

2.1.5 Night Vision 36

2.2.1 LAN....39

2.2.2 WLAN....41

2.2.3 Dynamic DNS 44

2.2.4 UPnP 45

2.2.5 LoginFree 47

2.2.6 RTSP 47

2.3 Motion Detection....49

2.3.1 Motion Detection ....50

2.3.2 Motion Region 52

2.4 System Info....58

2.4.1 Camera Information....59

2.4.2 Date / Time Setting....60

2.4.4 Utilities....62

2.5 Account....64

2.6.1 Status....67

2.6.2 Space Alarm....68

2.6.3 File Management 70

Chapter III: Using Surveillance Software ....71

3-1 Installing Network Camera Surveillance Software 71

3-2 Using Network Camera surveillance software....75

3-3 Configure Network Camera surveillance software....78

3-3-1 Configure cameras ....78
3-3-2 General Settings 85

3-4 Change Display Layout....90

3-5 Full-screen mode....93
3-6 Scan....94
3-7 Zoom-in / Zoom-out .....95
3-8 PTZ....96
3-9 Snapshot....97
3-10 Recording 98
3-11 Video Playback....99

Chapter IV: How to Access the Network Camera Remotely with iPhone & Android Phones ....100

4.1 iPhone App Installation 102
4.2 Android App installation ....113
4.3 Web browser installation 128

Chapter V: Appendix....134

5.1 Specifications .... 134
5.2 How to apply for a free DNS account at http://www.no-ip.com .....135
5.3 Troubleshooting ....137

Chapter I: Familiar with your Internet Network Camera

1.1 Package Contents

Thank you for purchasing this Network Camera! Before you start to use this Network Camera, please check the package contents. If anything is missing, please contact the dealer of purchase and return the package to claim for missing contents.

Item Name Quantity
1Network Camera 1
2Antenna(wireless model only) 1
3Power Adapter 1
4Ethernet Cable 1
5Driver and User Manual CD-ROM 1
6Accessory kit 1
7Quick Installation Guide1

System Requirements

• Computer with Windows® 7, Vista or XP
• PC with dual core or above; at least 2GB RAM
• Internet Explorer 6.0 above
- Existing 10/100 Ethernet-based network or wireless 802.11b/g/n network(for wireless model only)

1.2 Basic Introduction

Thank you for purchasing this Network camera! This Network camera is an ideal product for all kinds of video surveillance purposes, like home/office safety, kid/pet monitoring, and remote video acquire etc. Edimax IC-3110 series is tailor made to stream live video over your network. You can view the Network camera's video from anywhere on your local computers or via the Internet. Besides, Edimax IC-3110 series features high quality and high frame rate video streaming through advanced video compression. In order to achieve the highest video quality, simply select H.264, MPEG4 or M-JPEG depending on your network settings.

Some people may concern that there will be some places which will not be covered by camera, but this problem is completely solved by this Network camera. If the environment is too dark, it's also not a problem. This camera equips 9 IR-LEDs and will illuminate automatically when the environment is too dark, and the image captured by this camera will still be clear.

You can discover more useful functions in next section!

1.3 Product Highlights

No pre-loaded software required - all you need is a browser like Internet Explorer 6 (and above, with plugin installed).
With supplied video surveillance software, you can connect up to 16 video cameras and view images captured by every camera at the same time.
Supports 3 video resolutions: MJPG and H.264 SXGA(1280 x 1024), VGA (640 x 480), and QVGA (320 x 240); MPEG4 XGA (1024 x 768), VGA (640 x 480), and QVGA (320 x 240).
Anti-flicker function (eliminates flash caused by fluorescent lights, 50 / 60Hz selectable).
Supports all major web browser, including Microsoft Internet Explorer, Apple Safari, Google Chrome, Firefox, and Opera*.
Audio function, suitable for applications like video conference or environment monitor.
Wired and wireless network (802.11b / 802.11g / 802.11n) support, supports up to 100Mbps for wired network and 100Mbps for wireless network.
Wireless data encryption (WEP / WPA)
Supports DHCP and PPPoE protocol, you can also assign a fixed IP address to the camera also.
Supports Dynamic DNS (used to allocate the Network Camera's Internet address, when the ISP you're using does not assign you with a fixed Internet address).
Supports UPnP, Windows XP (and above) will discover this Network Camera in network neighbor automatically.
Send captured picture and video by Email or FTP when motion is detected.
- Configurable motion detection sensitivity (6 levels from most sensitive to least sensitive).
Built-in real-time clock, date and time information will be recorded with every captured picture / video clip (also supports auto time synchronization via network time protocol).
Upgradeable firmware.
Supports up to 16 users, and you can set different password to different user.
Usage and event logging.
*Some functionality like 'fit to window' only works on Microsoft Internet Explorer.

1.4 Key Components

Front View

Light Sensor IR LED LAN LED WLAN LED Power LED Camera Focus Ring Triple Mode EDiMAX NETWORKING PEOPLE TOGETHERA IC-3030i

LAN LED: Indicates LAN activity

WLAN LED: Indicates Wireless LAN activity (only work on wired model plugged with USB WiFi dongle and wireless model)

Power LED: Indicates power status

IR LEDs: Lights up when environment is too dark

Light Sensor: Detects lights of the environment

Focus Ring: Adjusts focus

Top View

Wired model

USB Port SD HC SD Card Slot

POE model

SD HC

Wireless model

Antenna SD HC

SD Card Slot: Accepts SD / SD-HC memory card for image / video storage

USB Port: Connects to certain wireless module.

Antenna Base: Connects to supplied antenna

Bottom View

Ethernet Connector

WPS 12V DC LAN Audio Out MIC Reset to Default /WPS Power Connector Audio Connector Microphone

WPS: click the button on IP Cam and click it on the AP you want to connect wireless connection.(works on wired model with USB wifi dongle plugged or wireless model)

Reset to Default Button: Press and hold for more than 10 seconds to reset the camera settings to factory default value.

Power Connector: Connects to 12V DC power adapter

Ethernet Connector: Connect to your local area network

Audio Connector: Connects to external speaker for audio output

Microphone: Built-in microphone for voice pick-up

Back View

Tripod Connector MAC Address Label

Tripod Connector: Connects to any standard tripod / camera wall holder. MAC Address Label: Shows the MAC address of this Network Camera. Useful when you can't locate the camera on the network.

1.5 Descriptions for LED Indicators

LED Name Status Description
Power/CloudOff Camera is not powered (camera off)
On Camera is correctly powered (camera on)
Flash The power LED will flash and light up when the camera is powered on and ready for access to Cloud.
LAN Off LAN port not in use
On LAN port in use
Flash Transferring data via LAN port
WLAN Off Wire less LAN not in use
On Wireless LAN in use
Flash at low speed Waiting for WPS connection from AP and flash speed is once a second.
Flash Transferring data via wireless LAN

1.6 Camera Installation

Please follow the following instructions to set your Network Camera up.

  1. Unpack the product package and check if anything's missing.
  2. Connect the Ethernet cable to your local area network, and connect the other end to the LAN jack of this Network Camera.
    NOTE: You can skip this step if you plan to use wireless LAN only.
  3. Plug the power adapter to wall socket, and connect the power connector to the power jack located at the bottom of the Network Camera.
  4. Connect two antennas to the antenna bases, which is located at the back of this Network Camera.
  5. Place the camera at a secure place, and point the camera to the place you wish to monitor. If you wish to hang the camera on the ceiling or wall, please use the tripod connector (located at the bottom of the camera) to secure the camera.
  6. Launch Internet Explorer on your computer, and following the instructions given in next section to set the Network Camera.

1.7 Locate the IP Address of this Network Camera

Default IP address of this Network Camera is 192.168.2.3. If you wish to assign another IP address to this Network Camera, you have to log onto the web configuration interface of the camera first.

If the left three fields of the IP address of your computer is not 192.168.2, you'll have to change the IP address of your computer first:

1. Click 'Start' -> 'Control Panel'

home user Internet Internet Explorer E-mail Outlook Express Command Prompt Windows Media Player Ralink Wireless Utility iTunes Yahoo! Music Jukebox MSN All Programs My Documents My Recent Documents My Pictures My Music My Computer Control Panel Set Program Access and Defaults Printers and Faxes Help and Support Search Run... Log Off Turn Off Computer start IP Camera - Microsoft...

2. Double-click 'Network Connections' icon.

Control Panel File Edit View Favorites Tools Help Back Search Folders Address Control Panel Go Control Panel Switch to Category View See Also Windows Update Help and Support Accessibility Options Add Hardware Add or Remov... Administrative Tools Automatic Updates Date and Time Display Folder Options Fonts Game Controllers Internet Options Keyboard Mouse Network Setup Wizard Phone and Modem ... Power Options Printers and Faxes QuickTime Regional and Language ...

3. Right-click 'Local Area Connection', and click 'Properties'.

Network Connections File Edit View Favorites Tools Advanced Help Back Search Folders Address Network Connections Network Tasks LAN or High-Speed Internet Create a new connection Set up a home or small office network Change Windows Firewall settings Disable this network device Repair this connection Rename this connection View status of this connection Change settings of this connection Local Area Connection Connected, Firewalled AMD ECNET Family BCT Ethernet... Disable Status Repair Bridge Connections Create Shortcut Delete Rename Properties

  1. Select 'Internet Protocol (TCP/IP)', then click 'Properties'.

Local Area Connection Properties General Advanced Connect using: AMD PCNET Family PCI Ethernet Ad Configure... This connection uses the following items: QoS Packet Scheduler AEGIS Protocol (IEEE 802.1x) v3.5.3.0 Internet Protocol [TCP/IP] Install... Uninstall Properties Description Transmission Control Protocol/Internet Protocol. The default wide area network protocol that provides communication across diverse interconnected networks. Show icon in notification area when connected Notify me when this connection has limited or no connectivity OK Cancel

  1. In 'IP address' field, please fill in any IP address begins with '192.168.2', and ends with a value greater than 2 and less than 254 (You can use the example in the picture '192.168.2.339'). In Subnet mask field, please fill '255.255.255.0'. Please keep all other fields empty, and click 'OK'.

Internet Protocol (TCP/IP) Properties General You can get IP settings assigned automatically if your network supports this capability. Otherwise, you need to ask your network administrator for the appropriate IP settings. Obtain an IP address automatically Use the following IP address: IP address: 192 . 168 . 2 . 239 Subnet mask: 255 . 255 . 255 . 0 Default gateway: Obtain DNS server address automatically Use the following DNS server addresses: Preferred DNS server: . Alternate DNS server: . Advanced... OK Cancel

If you changed the IP address of this Network Camera and you forget it, there're 2 methods to recover it:

a. Press and hold the 'Reset' button located at the bottom of this Network Camera, to clear all settings of the Network Camera and reset the IP address back to 192.168.2.3. You'll lose all settings in the Network Camera.
b. Ask network administrator to check the DHCP release table, if the camera was set to obtain the IP address by DHCP, a new record will be added to DHCP release table on DHCP server when the Network Camera is connected to the local area network.

1.8 Using the Camera Admin Software to Locate the Camera

If you can't connect to the camera by the instructions given in last chapter, you can use camera admin software to search the camera which is connected to your local area network. The admin software is also capable to locate multiple cameras on your local area network.

Please insert the user manual CD-ROM supplied in the product package, and the CD will automatically running the installation, if not please double-click 'EdiView Finder utility_v1.0.5' icon :'.

New 16 Chan File Edit View Favorites Tools Help Back Search Folders Address C:\Temp\New 16 Chan Go File and Folder Tasks Rename this file Move this file Copy this file Publish this file to the Web E-mail this file Delete this file Other Places Temp My Documents Shared Documents My Computer My Network Places Release Note_Admin Text Document 1 KB Setup_Admin_3.0.1 IPCam Admin Utility Setup Edimax Technology Co., Ltd. Release Note_Viewer Text Document 1 KB Setup_Viewer_3.0.0.6 IPCam Surveillance Software ... Edimax Technology Co., Ltd.

Then follow the following instructions to install and use camera admin software:

  1. Double-click Ediview finder installer, and click 'Run' when you're prompted:

Open File - Security Warning The publisher could not be verified. Are you sure you want to run this software? Name: E:\EdiView Finder v1.0.1.virtual.exe Publisher: Unknown Publisher Type: Application From: E:\EdiView Finder v1.0.1.virtual.exe Run Cancel This file does not have a valid digital signature that verifies its publisher. You should only run software from publishers you trust. How can I decide what software to run?

  1. Ediview finder will list all Ediamx network cameras found on local network, with their IP address and MAC address:

You can click icon to find network cameras on local network again, or select an network camera and click icon to configure it (see next step).

To preview the image of network camera, please click the icon indicated by white arrow, and provide username / password, and a snapshot will be displayed.

This function is only available when this icon is displayed as blue color.

EDiMAX Camera Name : IC-BD3C08 Model : Edimax_IC7010PT IP Address : 192.168.94.101 MAC Address : 00:1f:1f:bd:3c:08 English

  1. Ediview finder will inspect network camera's connection type and if it's connected to Internet, this may take a few seconds, please be patient

DHCP address obtained Testing cloud connection and detect network camera type. 9

  1. This message will tell you if your network camera is connected to Internet (connected to the cloud), and the connection type (wired or wireless). When you see this message, click 'Next' to continue. If you don't want to change network camera's name and password, you can click 'X' on the upper-right corner of window to close ediview finder utility

Your camera is connected to the cloud. This is a wire network camera. Click "Next" to set the network camera's name and password. Next

  1. You can input these information to configure network camera. Camera Name: Input network camera's name used to identify this network camera. Password: Input new password Confirm: Input new password again for confirmation Click 'OK' button to keep changes

Camera Name IC-BD3C08 Password Confirm OK

After the camera finder utility is launched, all cameras found on your local area network will be displayed. To preview the image of network camera, please click the icon indicated by white arrow, and provide username / password, and a snapshot will be displayed

This function is only available when this icon is displayed as blue color.

EDiMAX Camera Name : IC-BD486C Model : Edimax_IC-7110P IP Address : 192.168. 4. 60 MAC Address : 00:1f:1f:bd:48:6c English

All camera-related information will be displayed here. If you wish to connect to certain camera by web browser, double-click the camera listed here.

The camera admin software also provides several functions:

Language change: This camera finder utility supports 3 languages: English, Chinese, and Simplified Chinese. You can select the language you wish to use from language dropdown menu located at upper-right corner of camera finder utility.

EDiMAX Camera Name: IC-BD486C Model: Edimax_IC-7110P IP Address: 192.168. 4.60 MAC Address: 00:1f:1f:bd:48.6c English

Edimax IC-3110P - This function is only available when this icon is displayed as blue color. - 3

Search camera: Click this button to search all cameras on local area work again.

Edimax IC-3110P - This function is only available when this icon is displayed as blue color. - 4

Configure camera: Click this button to configure camera's network and ity setting. You'll be prompted to input camera's password:

Camera Name IC-BD3C08 Password Confirm OK

Input the password (default: 1234) and click OK to configure the camera's network and security setting:

Admin DHCP Static IP IP Address 192.168.4.60 Subnet Mask 255.255.255.0 Gateway 192.168.2.254 DNS 168.95.1.1 Cancel OK Advanced

In ‘Lan Setting’ page, you can configure camera’s network settings. Select ‘DHCP’ to set the camera to obtain an IP address from DHCP server on local area network automatically, and select ‘Manual IP’ to input the IP address information manually. Click ‘OK’ to save settings.

1.9 Logging in the Management Interface

Make sure the network camera is correctly powered (Power LED is on), and then launch Internet Explorer and type the IP address of the network camera in address bar of Internet Explorer. You should be prompted to input the user name and password:

Connect to 192.168.2.3 The server 192.168.2.3 at Internet Camera requires a username and password. Warning: This server is requesting that your username and password be sent in an insecure manner (basic authentication without a secure connection). User name: admin Password: Remember my password OK Cancel

Default user name is 'admin' and password is '1234'. Click 'OK' to continue after user name and password has entered.

If you're rejected, maybe the password has been modified previously. This should not happen if this is a newly-purchased camera, however, if you get the camera from someone else, the password would be changed. Please try to obtain the correct user name / password, or you'll have to reset the camera.

If this is the first time you log onto web management interface, you'll be prompted to install ActiveX Plugin:

Microsoft Internet Explorer ActiveX plugin is NOT installed yet, please install activeX first. OK

When you see this message, please click 'OK', and click 'Download the latest ActiveX' link to download plugin so you can use this camera:

IE ActiveX plugin is NOT installed yet. Please download the latest ActiveX and close IE browser before you reinstall it. Download the latest ActiveX Snapshot C:\Recording C:\Speak to IPCath Digital Zoom Fit to Window Size Full Screen

Click 'Run' to download plugin:

File Download - Security Warning Do you want to run or save this file? Name: Setup_v1.0.0.3.exe Type: Application, 747 KB From: 192.168.3.3 Run Save Cancel While files from the Internet can be useful, this file type can potentially harm your computer. If you do not trust the source, do not run or save this software. What's the risk?

Click 'Run' to install plugin:

Internet Explorer - Security Warning The publisher could not be verified. Are you sure you want to run this software? Name: Setup_v1.0.0.3.exe Publisher: Unknown Publisher Run Don't Run This file does not have a valid digital signature that verifies its publisher. You should only run software from publishers you trust. How can I decide what software to run?

Please click 'Next' button to start installation (click 'Next' or 'Install' when you're prompted, until installation is complete).

Setup - GLP IPCamPluginTMPT Welcome to the GLP IPCCamPluginTMPT Setup Wizard This will install Internet Camera ActiveX 1.0.0.3 on your computer. It is recommended that you close all other applications before continuing. Click Next to continue, or Cancel to exit Setup. Next > Cancel

Click 'Finish' to complete plugin installation.

Setup - GLP IPCamPluginTMPT Completing the GLP IPCAMPluginTMPT Setup Wizard Setup has finished installing GLP IPCamPluginTMPT on your computer. The application may be launched by selecting the installed icons. Click Finish to exit Setup. Finish

Now you can go back to web browser, and you should be able to see the image captured by camera (You may need to press F5 or CTRL-R to reload web page).

EDIMAX METHNICESH PRINCE VOLUME Camera Video Networks Motion Detection System Account SOMC English Video Type: MP014 Frequency: 50 Hz Flip Mode: Normal Brightness Save Reset Volume: Apply Snapshot C1 Recording C1 Speak to PCam Digital Zoom Fit to Window Size Full Screen

Note: If you see one of these messages (or both):

Display hardware is not capable of blit operations OK

OR

Error Can't initialize DirectX. OK

Your computer may not have the display capability that this Network Camera requires, or you don't have Microsoft DirectX® installed. Please download Microsoft DirectX® from Microsoft's website (http://www.microsoft.com), and try again.

In some cases, your computer is able to display the image from Network Camera correctly, but you'll still see these messages. If this happens, just ignore them.

Chapter II: Using Web Management Interface

2.1 Camera Settings

The first menu after you logged onto web management interface is 'Camera', and this is the only menu you can see the real-time image from camera.

EDIMAX INTRODGING PEOPLE VISTAEN Camers Video Networks Motion Detection System Account SDMC English Video Type: MP304 Frequency: 50 Hz Flip Mode: Normal Brightness Save Reset Volume Apply Snapshot C1 Recording C1 Speak to PCam Digital Zoom Fit to Window Size Full Screen

You can always back to this menu by clicking 'Camera' on the top of web management interface.

Camera Video Network Motion Detection System Account SDHC

The descriptions of every setting in this menu will be given below:

Item Description
Video Type Specifies video encoding type. Available options are ‘MPEG4’, ‘MJPEG’, and ‘H.264’. Different encoding type requires different bandwidth, and provides different video quality.
Frequency If the place where this Network Camera points to has a (or more) fluorescent light(s), the image may look flashing. In this case, you can adjust this setting to the frequency of electrical power; this can improve the image quality effectively. If you don’t know which one you should use, just try any of them and select one with less flicker.
Flip Mode If you’re not putting this camera on a horizontal surface but hang the camera on the ceiling or wall, you can use this function to rotate the displaying image.
Brightness /Saturation /SharpnessSelect brightness, saturation, and sharpness from dropdown menu, and click ‘-’ or ‘+’ button to increase or decrease brightness / saturation / sharpness setting value. In certain environment, adjust brightness, saturation, and / or sharpness will help improve video quality.
VolumeAdjust the‘-’ button to increase or decrease volume.
NOTE: When you change any setting(s) listed above, please click ‘Apply’ button so the change(s) will take effect. For following functions, changes will take effect right away.
SnapshotEdimax IC-3110P - Camera Settings - 3 SnapshotClick ‘Snapshot’ button to save the displaying image as an image file, a message box will appear after you click ‘Snapshot’ button, showing the filename and location of saved image file (default filename is current date and time).Default directory used to save image file is ‘C:\’, you

volume

can change the directory by clicking the text input box located at the right of ‘Snapshot’ button:Edimax IC-3110P - Camera Settings - 4and you’ll be prompted to select a new directory.
RecordingEdimax IC-3110P - Camera Settings - 5RecordingPress this button to record the displaying image as a video file in AVI format, and you can play the video file back by Windows Media Player. To stop recording, press ‘Stop Recording’ button (the same button). You can also change the directory used to save video file.
Speak to Network CamEdimax IC-3110P - Camera Settings - 6Speak to IPCamYou can transmit the voice received by your computer’s microphone to the camera’s external speaker. Press and hold this button, then speak to the microphone. Please note that external speaker must be connected to this camera.
Digital ZoomEdimax IC-3110P - Camera Settings - 7Digital ZoomIf you wish to enlarge certain portion of the captured image, you can click this button to set digital zoom:Edimax IC-3110P - Camera Settings - 8Click ‘Enable’ to enable digital zoom function, then you can drag the slide bar to adjust zoom ratio. You can also use your mouse to drag the zoom area (the green square) to reposition the zoom area.
Fit to Window SizeEdimax IC-3110P - Camera Settings - 9Fit to Window SizeClick this button and the image size will be adjusted to fit the size of browser window.
Full Screen Click this button to display the image in full-screen
Full Screenmode (uses all available space to display the image captured by this camera).

*Please note: If you're not using Microsoft Internet Explorer as web browser, some functionalities may not work properly.

2.2 Video

You can change video-related settings of this Network Camera in 'Video' menu. You can access this menu by clicking 'Video' on the top of web management interface.

Camera Video Network Motion Detection System Account SDHC

There are 5 types of video settings for this Network Camera. To set the option of a certain video setting, put mouse cursor on it and its options will appear.

Video

MJPEG MPEG4 H.264 OSD Night Vision MJPEG ✓ Video Resolution : 640 x 480 ✓ Video Quality : Highest ✓ Frame Rate : 30 Apply

2.1.1 MJPEG

You can adjust video settings when you select 'MJPEG' as video type in 'Camera' menu.

MJPEG

Video Resolution : 640 x 480 Video Quality : Highest Frame Rate : 30 Apply

The descriptions of every setting in this menu will be given below:

Item Description
Video Resolution Changes thethe resolution of video. Available options are 1280 x 1024, 640 x 480, and 320 x 240. Higher resolution provides better video quality and more detail, but requires more network bandwidth.
Video Quality Changes videoquality. There are 5 levels of video quality from ‘Lowest’ to ‘Highest’. Selecting a higher video quality will provide better video quality, but requires more network bandwidth.
Frame Rate Changes video frame rate. Available options from ‘30’ to ‘1’, indicates how many video frames this camera will transmit every second. Higher frame rate provides smooth video watching experience and will not lose details of video, but requires more network bandwidth. If you’re using this video camera with insufficient network bandwidth, selecting a lower frame rate setting will help.

Click 'Apply' for settings to take effect.

2.1.2 MPEG4

You can adjust video settings when you select 'MPEG4' as video type in 'Camera' menu.

MPEG4

Video Resolution :
Video Quality :
√ Frame Rate :

Edimax IC-3110P - MPEG4 - 1

The descriptions of every setting in this menu will be given below:

Item Description
Video Resolution Changes theresolution of video. Available options are 1024 x 768, 640 x 480, and 320 x 240. Higher resolution provides better video quality and more detail, but requires more network bandwidth.
Video Quality Changes videoquality. There are 5 levels of video quality from ‘Lowest’ to ‘Highest’. Selecting a higher video quality will provide better video quality, but requires more network bandwidth.
Frame Rate Changes video frame rate. Available options from ‘30’ to ‘1’, indicates how many video frames this camera will transmit every second. Higher frame rate provides smooth video watching experience and will not lose details of video, but requires more network bandwidth. If you’re using this video camera with insufficient network bandwidth, selecting a lower frame rate setting will help.

Click 'Apply' for settings to take effect.

2.1.3 H.264

You can adjust video settings when you select 'H.264' as video type in 'Camera' menu.

H.264

Video Resolution :
Video Quality:
√ Frame Rate :

Edimax IC-3110P - H.264 - 1

The descriptions of every setting in this menu will be given below:

Item Description
Video Resolution Changes thethe resolution of video. Available options are 1280 x 1024, 640 x 480, and 320 x 240. Higher resolution provides better video quality and more detail, but requires more network bandwidth.
Video Quality Changes videoquality. There are 5 levels of video quality from ‘Lowest’ to ‘Highest’. Selecting a higher video quality will provide better video quality, but requires more network bandwidth.
Frame Rate Changes video frame rate. Available options from ‘30’ to ‘1’, indicates how many video frames this camera will transmit every second. Higher frame rate provides smooth video watching experience and will not lose details of video, but requires more network bandwidth. If you’re using this video camera with insufficient network bandwidth, selecting a lower frame rate setting will help.

Click 'Apply' for settings to take effect.

2.1.4 OSD

If you need to display information about this camera, like camera's name or current date / time, you can use OSD (On-Screen Display) menu:

On-Screen Display

On-Screen Display : Enable Disable Show Camera Name : Enable Disable Show Date : Enable Disable Show Time : Enable Disable Apply

The descriptions of every setting in this menu will be given below:

Item Description
On-Screen Display Select ‘Enable’ to enable on-screen display function (information about this camera will be displayed on camera’s display image), and select ‘Disable’ to disable it.
Show Camera Name Select ‘Enable’ to show camera’s name on camera’s display image, select ‘Disable’ to hide it.
Show Date Select ‘Enable’ to show current date on camera’s display image, select ‘Disable’ to hide it.
Show Time Select ‘Enable’ to show current time on camera’s display image, select ‘Disable’ to hide it.

Click 'Apply' for settings to take effect.

When OSD is enabled, selected OSD items will be displayed like this:

2009 .01 .01 17 : 00 : 36 IC -A31 201

2.1.5 Night Vision

This camera equips with 10 IR LEDs to enhance video quality in the night. You can enable or disable IR LEDs by 'Night Vision' menu:

IR Control

Alaways turn off IR led
○ Alaways turn on IR led
Auto mode
Turn on/off IR led by schedule

√ Turn on IR led from :

Turn off IR led from :

0 : 0 24-hour (hh : mm) 0 : 0 24-hour (hh : mm)

Apply

The descriptions of every setting in this menu will be given below:

Item Description
Alaways** turn off IR ledDo not use IR LEDs, even it's very dark.
Alaways** turn on IR ledTurn IR LEDs on, even it's very bright.
Auto mode Let camera decideto switch LED lights on or off automatically: LEDs will light up when it's too dark. If you don't know which option you should select in this page, select this one.
Turn on/off IR led by scheduleSwitch IR LEDs on or off by schedule. You have to input start time in ‘Turn on IR led from’ section, and end time in ‘Turn off IR led from’ section.

Click 'Apply' for settings to take effect.

2.2 Network Settings

All network-related settings can be found in this menu, and you have to specify TCP/IP parameters in this menu if you want to change IP address, use PPPoE, Dynamic DNS, and activate UPnP function.

You can access this menu by clicking 'LAN' on the top of web management interface.

Camera Video Network Motion Detection System Account SDHC

After you selected 'Network', network setting menu will appear. There are 6 sub-menus available here:

Network
LANWLANDynamic DNSUPnPLoginFreeRTSP

Please click the network setting you wish to set, and then refer to instructions given below:

2.2.1 LAN

You can define IP address and select the port number you wish to use here.

LAN

✓ Network Type : ○ DHCP ● Static IP Address ✓ IP Address : 192.168.3.3 ✓ Subnet Mask : 255.255.255.0 ✓ Gateway : 192.168.2.254 ✓ Primary DNS : 168.95.1.1 ✓ Secondary DNS : ✓ Web Port : 80

PPPoE

Enable PPPoE : User Name : Password : MTU : 1392 (512<=MTU Value<=1492) Apply Enable Disable

The descriptions of every setting in this menu will be given below:

Item Description
Network Type Thiscamera can obtain the IP address from DHCP server automatically (if you have one), or set a fixed IP address. Select ‘DHCP’ to obtain IP address automatically or ‘Static IP Address’ to assign this Network Camera with a fixed IP address.When ‘DHCP’ is selected, IP address parameters below will be grayed out.
IP Address Specify the IP address for this Network Camera here.
Subnet Mask Specify the subnet mask for this Network Camera here.
Gateway Specify the gateway address of the local network here.
Primary DNS Specify the IP address of DNS server here. Please input IP address only. If you don’t know the address of DNS server, ask network administrator or your ISP for help.
Secondary DNS Specify the IP address of backup DNS server here. When primary DNS is unreachable, Network Camera will use the IP address specified here as DNS server.This field is optional.
Web Port Specify the port number of web management interface here. If it’s not 80, you’ll have to add ‘:port’ after the IP address / hostname of this Network Camera.For example, if the HTTP port number you specified here is 90 and the IP address of Network Camera is 10.20.20.30, then you have to input‘http://10.20.20.30:90’in the address bar of Internet explorer.
Enable PPPoE Select ‘Enable’ to activate PPPoE function of this Network Camera, select ‘Disable’ to disable it.
User Name Input the PPPoE username assigned by your ISP here.
Password Input the PPPoE password assigned by your ISP here.
MTU Input the MTU (Maximum Transmission Unit) given by your ISP here. Ask your ISP if you don’t know what value you should input here. Default value should work with
most of ISPs and will give you a nice network performance.

Click ‘Apply’ to save settings and make the new settings take effect.

2.2.2 WLAN

Wireless LAN ✓ Wireless Connection : ○ Enable ● Disable ✓ Network Type : Infrastructure ✓ ✓ Available Networks : Refresh Connect SSID MAC Address Signal Channel Encryption Network Type ● 00:07:40:FE:60:7E ▼ 4 WPAPSK(TKIP) Infrastructure ○ books 00:1B:11:62:84:68 ▼ 8 WPA2PSK(AES) Infrastructure SSID : ✓ Channel : 1 ✓ Wireless Key : ••••••••••••••••••••••••••••••••••• Apply WPS ✓ Self PinCode : 31500203 ✓ Configure via Push Button : Start PBC ✓ Configure via PinCode : Registrar SSID : Start PIN

The descriptions of every setting in this menu will be given below:

Item Description
Wireless ConnectionSelect ‘Enable’ to activate wireless network function of this Network Camera, select ‘Disable’ to disable it.
Network Type Select the network type of wireless connection.
Available options are ‘Infrastructure’ (Connect the Network Camera to a wireless access point), and ‘Adhoc’ (This Network Camera will become a stand-alone wireless network point, other wireless computers / devices can discover this Network Camera and connectto it without wireless access point).You can set to ‘Adhoc’ when you don’t have any wireless access point, but your computer has wireless network card. Set to ‘Infrastructure’ when you have wireless access point, and you have computers with wired network connection.
Available NetworksHere shows all wireless access points found by this Network Camera. Please note not all access points will be displayed at the same time, if the access point you expected to connect does not appear, you may have to click ‘Refresh’ button for several times until it appears.The descriptions of all fields is listed below:Connect: You can select the wireless access point you wish to connect here.SSID: the SSID of all found wireless access points will be shown here. Some wireless access point may hide their SSID; in this case, you have to identify them by their MAC address.MAC Address: If you there are many wireless access points in proximity or some wireless access point hides it’s SSID, you can use MAC address to distinguish them. Signal: Shows the radio signal strength in percent. Channel: Shows the radio channel of this wireless access point.Encryption: Shows the encryption type used by this wireless access point. You must use the same encryption type if you wish to connect to a certain wireless access point. If the wireless access point does not use encryption, ‘Disabled’ will be displayed here.Network Type: Shows the network type of a certain wireless access point (Infrastructure or Adhoc).
SSID Input the SSID of the wireless access point you wish to connect. It should be less than 32 alphanumerical characters.When you select a wireless access point above, it's SSID will be filled in this field automatically. However, if the SSID is not displayed (the wireless access point you selected choose to hide it's SSID), you have to know it's SSID and input it here, or you will not be able to connect it.
Channel Select the radio channel you wish to use here. When network type is ‘Infrastructure’, the radio channel is auto-selected according to the channel that wireless access point uses. You can only select the channel number when network type is ‘Adhoc’.
Wireless Key Input the encryption key of selected wireless access point here. This is required when access point you wish to connect uses encryption.
Self PinCode Here displays the WPS pin code used to connect to WPS-enabled wireless access points. You have to input this number into the WPS enabled access point to establish WPS connection.
Configure via Push Button Click this button and this camera will enter PBC-style WPS connection state for 120 seconds. Please push ‘Start PBC’ button on the wireless access point you wish to connect within 120 seconds to establish WPS connection (The remaining time will be displayed on the button).If connection can not be established after 120 seconds, you'll be prompted by a message box, and you can press ‘Start PBC’ button to try again.
Configure via PinCode If you have wireless access point's WPS PIN code, you can input it here and press ‘Start PIN’ button to start to establish PIN-style WPS connection.

2.2.3 Dynamic DNS

If your ISP does not give you a fixed Internet IP address (i.e. the Internet address you're using when you access the Internet is not always the same – ask your ISP for detailed information), you can use this function to help you locate the IP address of this Network Camera when you're away from home or office.

Before you can use this function, you'll need to apply for an account at dyndns.org/ no-ip.com (http://www.dyndns.org/ or http://www.no-ip.com). Detailed instructions of how to apply a new account can be found on dyndns.org's or no-ip.com website.

Dynamic DNS

The descriptions of every setting in this menu will be given below:

Item Description
Enable DDNS Select‘Enable’ to activate Dynamic DNS function of this Network Camera, select ‘Disable’ to disable it.
Provider Select dynamic DNS service provider here. Dyndns.org or no-ip.com is available currently.
Host Name Input dynamic DNS host name here.
User Name Input dynamic DNS user name here, must be the same as the one you applied on dyndns.org or no-ip.com.
Password Input dynamic DNS password here, must be the same as the one you applied on dyndns.org or no-ip.com.

Click 'Apply' to save settings and make the new settings take effect.

2.2.4 UPnP

When UPnP function is activated, all UPnP-compatible computers / network devices will be able to discover this Network Camera automatically (only those in the same local network).

This function is useful and you don't have to remember the IP address of this Network Camera. Simply open ‘Network neighbor’ and it's there!

UPnP ✓ Enable UPnP : Enable Disable Apply

The descriptions of every setting in this menu will be given below:

Item Description
Enable UPnP Select ‘Enable’ to activate UPnP function of this Network Camera, select ‘Disable’ to disable it.

Click 'Apply' to save settings and make the new settings take effect.

After UPnP function is activated, a popup message will appear:

IC-E52C85 A new device is now available on your network. For more information, click here.

Click the message to open 'My Network Places', and you'll see the Network Camera:

My Network Places File Edit View Favorites Tools Help Back Search Folders Address My Network Places Go Network Tasks Add a network place View network connections Set up a home or small office network Set up a wireless network for a home or small office View workgroup computers Hide icons for networked UPnP devices Local Network IC-E52C8S

You can double-click the icon to launch Internet Explorer and log onto Network Camera's web management interface directly.

2.2.5 LoginFree

This camera provides a method to let unauthorized users to view the image captured by this camera, which is called as 'LoginFree'. When you wish to let everyone to view the image captured by this camera, or integrate the image with your own web application, you can use this function:

LoginFree ✓ Filename : jpg Apply

Input the filename here, and click 'Apply' to save settings, then other users can access the image by this filename with .jpg extension with the camera's IP address as prefix. For example, if your camera's IP address is '192.168.2.1' and the filename you set here is 'picture', then everyone on the web can access the image captured by this camera by using the following address:

http://192.168.2.1/picture.jpg

Please note that no authentication will be required to see the captured image. If you wish to disable this function, clear the text in 'Filename' field and click 'Apply.

http://192.168.98.215/picture.jpg - Microsoft Internet Explorer File Edit View Favorites Tools Help Back Search Favorites Address http://192.168.2.fpicture.jpg Go Live 30 1970.01.01 10:08:18 Done Internet

2.2.6 RTSP

If you want to watch video captured by this Network Camera by your own RTSP (Real Time Streaming Protocol) media player, you can use this function to setup RTSP parameters, so your RTSP-compatible player will be able to receive video data.

Video Streaming

RTSP Port : 554 MPEG4 RTSP Path : ipcam .sdp H264 RTSP Path : ipcam_h264 .sdp RTP Port Range : 50000 - 60000 Apply

The descriptions of every setting in this menu will be given below:

Item Description
RTSP Port Input the port number of RTSP here. Default setting is 554.
MPEG4 RTSP PathInput the path of MPEG4 RTSP video file. When you use RTSP-compatible media player to play RTSP stream, please remember to add ‘.sdp’ file extension.
H.264 RTSP PathInput the path of H.264 RTSP video file. When you use RTSP-compatible media player to play RTSP stream, please remember to add ‘.sdp’ file extension.

2.3 Motion Detection

When you wish to use this camera to monitor the activities, motion detection function will be very useful. Camera will detect the motion in captured image, and take a snapshot when motion is detected. So you can use this camera to keep the safety of the belongings you have.

To use motion detection, click the following link from the top of menu:

✓ Camera ✓ Video ✓ Network ✓ Motion Detection ✓ System ✓ Account ✓ SDHC

After you selected 'Motion Detection', a sub-menu will appear. There are 5 sub-menus available here:

Motion DetectionMotion RegionE-MailFTP ConfigurationSD Card Configuration

Detailed descriptions of every setting will be given below.

2.3.1 Motion Detection

You can use this menu to setup basic motion detection settings:

Motion Detection

√ Enable Motion Detection :
√ Motion Detection Interval :
Recording Time :
√ Sending File Type :
√ Send snapshot file to FTP :
√ Send snapshot file to E-Mail :

Enable Disable
5 seconds
3
JPEG
○ Enable ◦ Disable
○ Enable ◦ Disable

SD Card

SD Card Record :
√ Storage File Type :
Record File Size :

○ Enable ◦ Disable
Anonymous
The image contains no text or characters. It is a blank rectangular box with no visible content, figures, or markings. Therefore, there is no OCR result to output.
The image contains no text or characters. It is a blank rectangular box with no visible content, figures, or markings. Therefore, there is no OCR result to generate.
192.168.3.61
share
JPEG
10 MBytes (Max 100 MB)
Apply Samba Test

The descriptions of every setting in this menu will be given below:

Item Description
Enable Motion DetectionSelect ‘Enable’ to enable motion detection, and select ‘Disable’ to disable this function.
Motion Detection IntervalSelect the time interval between two motions from dropdown menu. When a motion is detected, camera will not detect any motion again within the time interval you specified here. Available options are from 0 second (always detect new motion) to 60 seconds.
Recording TimeSelect the duration you wish this camera to record image when a motion is detected from dropdown menu. Available options are 1, 2, 3, 4, and 5 (seconds).
Sending File TypeSelect the file type that will be saved when a motion is detected. Select 'JPEG' and a still picture in JPEG format will be saved; and select 'AVI' to save a motion video clip.
Send snapshot file to FTPSelect 'Enable' to send the saved file to appointed FTP server when a motion is detected, select 'Disable' to disable this function. You have to configure FTP server parameters in 'FTP Configuration' menu first, so this function will take effect (see below).
Send snapshot file to E-MailSelect 'Enable' to send the saved file to appointed E-mail address when a motion is detected, select 'Disable' to disable this function. You have to configure mail server parameters in 'FTP Configuration' menu first, so this function will take effect (see below).
SD Card RecordSelect 'Enable' to record detected motion to SD card (if there's one), and select 'Disable' to disable this function.
Storage File TypeSelect saving file type for motion detection: JPEG (still picture) or AVI MPEG4 / AVI H264 (for motion picture).
Record File SizeInput the maximum file size of saved file in Mbytes.Maximum file size is 100.
Record to FolderSelect 'Enable' to save file to a network folder which supports SAMBA (also known as 'Windows Network Neighborhood'), select 'Disable' to disable this function.
Authentication If uusername and password are not required to write files in specified folder, select 'Anonymous'; if required, select 'Account'.
User Name Inputuser name required by destination network folder.
Password Input ppassword of the user name required by destination network folder.
Samba Server Inputthe IP address or host name of network file server.
Shared Folder Inputthe folder name on file server.
Storage File TypeSelect saving file type for motion detection: JPEG (still picture) or AVI MPEG4 / AVI H264 (for motion picture).
Record File SizeInput the maximum file size of saved file in Mbytes.Maximum file size is 100.

Click ‘Apply’ to save settings and make the new settings take effect.

2.3.2 Motion Region

You can define the motion detection region within the image that camera captures, so this camera will ignore motions which are not covered by the motion region setting, and reduce the chances of false alarm.

2009.01.01 20:17:10 IC-A31201 Region3 Region1 Region2 Region1 Sensitivity 90 90 90 Refresh Save

The descriptions of every setting in this menu will be given below:

Item Description
Region 1 – 3 Check the box to enable motion detection region 1 to 3.You can check multiple boxes to enable multiple motion detection regions. When you checked a box, a new region (and region number) will be displayed on captured image.
Sensitivity Move the slide bar to change the motion detection sensitivity setting: Drag the slide to the right to increase sensitivity (camera will detect minor changes in the image), and drag the slide to the left to decrease sensitivity (camera will only detect major changes in the image).
Refresh In case the objects of the image captured by the camera moved, click this button to reload the image captured by camera, so you can decide the motion detection region more precisely.
Save Save motion detection region settings.

To change the motion detection region, you can ‘resize’ and ‘reposition’ it:

Edimax IC-3110P - Motion Region - 2

natural_image Illustration of a military jet with visible cockpit and fuselage against a pink background (no text or symbols)

Move the mouse cursor to the eight dots located at the border of motion detection region, and the mouse cursor will switch to ↗, ↘ or . You can click and hold mouse button and move the mouse to resize the motion detection region.

To move reposition the motion detection region, move the mouse within the motion detection region, and the mouse cursor will switch to . Click and hold mouse button and move the mouse to reposition the motion detection region.

2.3.3 Email

You can define the destination address of E-mail sending and mail server parameters here.

E-Mail

Recipient E-Mail Address : E-Mail Subject : Motion Detection Notification SMTP Server : Sender E-Mail Address : SMTP Port : 25 SMTP enable SSLv2v3 function : Enable Disable SMTP Authentication : Enable Disable User Name : Password : Apply Send a test email

The descriptions of every setting in this menu will be given below:

Item Description
Recipient E-Mail AddressInput the email recipient's Email address here.
E-Mail Subject Spspecify the title of sending email, so you can identify the mail sent from this camera from others quickly.
SMTP Server Inputthe IP address or host name of the SMTP server (the server that delivers the Email for you) here.If you don't know, please refer to the SMTP server you're using in your Email software (like Outlook, Outlook Express etc.), or ask your network administrator or ISP.
Sender E-Mail AddressInput the Email address of mail sender, this will help you to identify the Email sent by this Network Camera by sender's Email address.NOTE: Some mail server would reject to deliver the Email from unknown sender, it's recommended to input your own Email address here, or any other actual one.
SMTP AuthenticationSome SMTP server requires mail senders to be authenticated before they can send Email. If your SMTPserver requires you to do so, please select ‘Enable’, or select ‘Disable’ to disable it. If you don’t know, please refer to the SMTP server you’re using in your Email software (like Outlook, Outlook Express etc.), or ask your network administrator or ISP.
User Name Pleaseinput the user name of SMTP server here, if your SMTP server requires the use of authentication.
Password Pleaseinput the password of SMTP server here, if your SMTP server requires the use of authentication.

Click 'Apply' to save settings and make the new settings take effect.

After that, you can click 'Send a test email' to send a testing Email to the address you set here, so you can make sure the setting you specified here is correct and working.

2.3.4 FTP Configuration

You can set FTP server's parameters here.

FTP Configuration ✓ FTP Server : ✓ FTP Port : 21 ✓ User Name : ✓ Password : ✓ Remote Folder : ✓ Passive Mode : Enable ○ Disable Apply Upload a test file

The descriptions of every setting in this menu will be given below:

Item Description
FTP Server Inputthe IP address or host name of the FTP server you wish to use here.
FTP Port Input theport number of the FTP server you wish to use here.
User Name Inputthe user name of the FTP server you wish to use here.
Password Input thepassword of the FTP server you wish to use here.
Remote Folder Inputput the remote folder name on the FTP server here. If nothing is specified here, all uploaded image files will be placed in FTP server's root directory.Please ask FTP server's administrator to know which folder you should use. Certain user name may have restrictions and therefore can not place the file in the directory not owned by the user.
Passive Mode Select‘Enable’ to use passive mode to send file, or select ‘Disable’ to not to use passive mode to send file.Some FTP servers require passive mode, if you don't know, please ask FTP server's administrator; most of FTP servers will work fine with both modes, but if youfound that non-passive mode is not working, you can try to use passive mode.

Click ‘Apply’ to save settings and make the new settings take effect.

After that, you can click 'Upload a test file' to send a file to the FTP server you set here, so you can make sure the setting you specified here is correct and working.

2.3.5 SD Card Configuration

You can define the filename and destination folder when saving a file in SD card.

SD Card Configuration

Enable Cycle Recording

File Name Prefix :

Motion

√ Destination Folder :

record

Apply

The descriptions of every setting in this menu will be given below:

Item Description
Enable Cycle RecordingCheck this box and this camera will automatically erase oldest image file to make rooms for new image files when SD card is full. If you don’t want to lose old image files, do not check this box.
File Name PrefixSpecify the filename prefix (the texts which will be added before the file sequence number).
Destination FolderSpecify the folder name that camera will store the saved image or video clip.

Click 'Apply' to save settings and make the new settings take effect.

2.4 System Info

You can use this menu to get the operational information of this camera:

✓ Camera ✓ Video ✓ Network ✓ Motion Detection ✓ System ✓ Account ✓ SDHC

After you selected 'System Info.', a sub-menu will appear. There are 4 sub-menus available here:

Camera InformationDate / Time SettingScheduleUtilitiesStatusSystem Log

Detailed descriptions of every setting will be given below.

2.4.1 Camera Information

Camera information allows you to set the name and administrator's password of this camera.

Camera Information ✓ Camera Name : IC-5010PTn ✓ Password : ••••• ✓ Confirm Password : ••••• Apply

The descriptions of every setting in this menu will be given below:

Item Description
Camera Name Please specify the name of this Network Camera here.This can be used to identify your camera on the network when you have more than one Network Camera in the same network.Default name begins with ‘IC-‘ plus the last 6 characters of the MAC address of this Network Camera. You can modify the name to the one you can remember and meaningful to you, but never give all Network Cameras in the same network with same name.
Password Please specify user name ‘admin’ ‘s password here. (The one you need when you log onto web management interface and use ‘admin’ as user name.
Confirm PasswordPlease input the same password again, to make sure there’s no typo.

Click 'Apply' to save settings and make the new settings take effect.

2.4.2 Date / Time Setting

This setting allows you to change the date and time of the real time clock in this Network Camera. You can set the time manually, or use network time protocol (NTP) to set the time automatically.

Date / Time Setting
Set Date/Time manually NTP Server ✓ Time Zone : ✓ NTP Server : ✓ Daylight Saving Time : Apply Synchronize to PC time (GMT+08:00) Taipei pool.ntp.org Yes No

The descriptions of every setting in this menu will be given below:

Item Description
Set Date/Time manually / NTP ServerIf you select ‘Set Date/Time manually’, you can set the date and time of this camera manually. Please input the date and time you wish to set here.Date / time format is YYYY / MM / DD HH:MM:SS Time is in 24-hour format.You can click ‘Synchronize to PC time’ to use the time of the computer you’re using.Example: 24^th August 2007 = 2007/ 08 / 24,and PM 9:24:30 = 21:24:30If you select ‘NTP Server’, the camera will get the date and time from NTP Server automatically.
Time Zone Pleaseselect the time zone of the country / city of resident from dropdown menu here.
NTP Server Pleaseinput the IP address or host name of NTP server here. You can use default value ‘pool.ntp.org’, or ask your ISP for the IP address or host name, if they have one.
Daylight Saving Ifyour area of residence uses daylight saving, select
Time ‘Yes’; otherwise select ‘No’.
Synchronize to PC timeClick to input current time of your computer to ‘Set Date / Time manually’ field.

Click 'Apply' to save settings and make the new settings take effect.

If you wish to use the date and time setting of the computer which is connecting to the camera, click 'Synchronize to PC time' button. The date and time setting of the computer will be filled to date and time setting in this page.

2.4.3 Schedule

You can use this menu to setup Schedule Snapshot/Recording settings:

Schedule Snapshot ✓ Enable FTP Schedule : ✓ Time Interval : ✓ File Control : ✓ Enable E-Mail Schedule : ✓ Time Interval : Schedule Recording ✓ Enable Schedule Recording : ✓ Time Interval : ✓ Recording Time : ✓ Send Recording File to FTP : ✓ File Control : ✓ Send Recording File to E-Mail : Apply ○ Enable ○ Disable ○ Upload one image to FTP server every 1 hour(s) /Frame ○ Upload one image to FTP server every 2 Frames per Second ○ Upload files with filename composed of date / time ○ Overwrite file with the same filename : snapshot.jpg ○ Enable ○ Disable Send one image every 1 hour(s) Apply ○ Enable ○ Disable Send one recording file every 0 minute(s) 10 seconds (from 1 second to 10 seconds) ○ Enable ○ Disable ○ Upload files with filename composed of date / time ○ Overwrite file with the same filename : record.avi ○ Enable ○ Disable

Item Description
Enable FTP ScheduleSelect ‘Enable’ to send the Schedule Snapshot to the appointed FTP server, or select ‘Disable’ to disable this function. You have to configure FTP server parameters in ‘FTP Configuration’ menu first, so this function will take effect.
Time Interval Youcan choose to upload one image to FTP server according to the time interval you wish, or choose to upload image as you wish to FTP server every second.
File Control This optionoption allows you to choose to upload each schedule snapshot with different file name composed of date/time, or to choose to upload the schedule snapshot with the same file name you wish. If you choose the latter, the prior-saved schedule snapshot will be overwritten by the latest schedule snapshot.
Enable E-Mail ScheduleSelect ‘Enable’ to send the Schedule Snapshot to the appointed e-mail address, or select‘ Disable’ to disable this function. You have to configure e-mail settings in ‘Email’ menu first, so this function will take effect.
Time Interval This optionoption allows the network camera to send one image according to the time interval you wish.
Enable Schedule RecordingSelect ‘Enable’ to enable schedule recording, or select ‘Disable’ to disable this function.
Time Interval This optionoption allows the network camera to send one recording file according to the time interval you wish.
Recording Time This optionThis option allows you to adjust the recoding time based on your preference.Note:The available recording time is based on the video resolution and video frame rate settings in ‘Video’ menu.
Send Recording File to FTPSelect ‘Enable’ to send the recoded video to the appointed FTP server, or select‘ Disable’ to disable this function. You have to configure FTP server parameters in ‘email & FTP’ menu first, so this function will take effect.
File Control This optionoption allows you to choose to upload each recorded video with different file name composed of date/time, or to choose to upload the recorded video with the same file name you wish. If you choose the latter, the prior-saved recorded video will be overwritten by the latest recorded video.
Send Recording File to E-MailSelect ‘Enable’ to send the recorded video to the appointed e-mail address, or select‘ Disable’ to disable this function. You have to configure e-mail settings in ‘email & FTP’ menu first, so this function will take effect.

2.4.4 Utilities

This menu allows you to upgrade firmware, clear all settings, reboot the Network Camera, and switch LED lights on/off.

Utilities

√ Upgrade Firmware :
√ Reset To Factory Defaults :
Reboot Device :
LED Setting :

Browse... Upgrade Reset Reboot Turn off LED light

The descriptions of every setting in this menu will be given below:

Item Description
Upgrade FirmwareIf you downloaded latest firmware file from our website, you can click 'Browse' button to pick a firmware file located on your computer's hard drive and you can upload the firmware file to the Network Camera later.After you selected a proper firmware file from your computer, click 'Upgrade Firmware' button to start upgrade. DO NOT DISCONNECT NOW!If the firmware file you provided is invalid of you didn't provide the firmware file, you'll be prompted to select another valid firmware file again.The Network Camera will reboot after the upgrade procedure is done. PLEASE NOTE THAT THE IP ADDRESS OF THE CAMERA WILL RESET TO DEFAULT VALUE: 192.168.2.3
Reset to Factory DefaultsClear all settings in the camera. Please think again before you do this, and then click this button to reset all settings.NOTE: IP address will be reset to default value‘192.168.2.3’ also. You'll need to change the IP addresssetting of your computer if the IP address of your computer does not begin with ‘192.168.2’, and subnet mask is not ‘255.255.255.0’, or you’ll not be able to connect to this Network Camera again.
Reboot Device If you found the Network Camera is responding slowly or behaves strange, you can click this button to try to reboot the Network Camera, this may help.
LED Setting Click‘Turn off LED light’ button to switch the LED light of this Network Camera off, so all LEDs on the Network Camera will stop working, in case you don’t want other people know the camera is transferring data.You can click this button again to switch LED lights on again.

Click 'Apply' to save settings and make the new settings take effect.

2.4.5 Status

This menu provides all information about this Network Camera, like firmware version, system uptime, date / time, and network information.

System

√ Firmware Version : v1.0 (Apr 28 2010 10:20:19)
√ Device Uptime : 16 min 13 sec
System Time : 2010/01/01 08:15:59

LAN

IP Address : 192.168.2.3
Subnet Mask: 255.255.255.0
Gateway: 192.168.2.254
DNS Server: 168.95.1.1
√ MAC Address : 00:1F:1F:AA:47:A7
HTTP Port: 80

PPPoE ✓ Link Status : Disconnected

IP Address :

Subnet Mask:

Gateway:

DNS Server:

DNS Server:

DNS Server:

DNS Server:

DNS Server:

2.4.6 System Log

All activities of this network camera will be logged, and you are allowed to enter 'System Log' menu to view these logs.

System Log

1970/01/01 00:00:13 Failed to open PT device! 1970/01/01 00:00:13 System startup [ v1.0 (May 4 2010 18:09:39) ] 2010/01/01 00:00:00 Start Storage Manager.. (PID:67) 2010/01/01 00:00:00 No storage medium found. 2010/01/01 00:00:00 Start Samba Storage Manager.. (PID:68) 2010/01/01 00:00:00 Set microphone volume to 80 2010/01/01 00:00:00 Set Line-Out volume to 80 2010/01/01 06:00:00 embedded av stream server started PID:72 2010/01/01 08:00:00 Failed to open PT device! 2010/01/01 08:00:00 Starting mpeg4 pipe server for Spook 2010/01/01 08:00:00 Starting h264 pipe server for Spook 2010/01/01 08:00:00 Starting audio pipe server for Spook 2010/01/01 08:00:00 embedded av stream controller started (PID:81) 2010/01/01 08:00:00 Opened /dev/pl_grab successfully 2010/01/01 08:00:01 Opened /dev/pl_enc successfully (MPEG4) 2010/01/01 08:00:01 Opened /dev/pl_enc successfully (MJPEG) 2010/01/01 08:00:01 Opened /dev/pl_Z64 successfully (HZ64) 2010/01/01 06:00:01 Opened /dev/pl_enc successfully (MD) 2010/01/01 06:00:01 Accepted a new connection from spook... (mpeg4 video) 2010/01/01 06:00:01 Accepted a new connection from spook... (h264 video) 2010/01/01 08:00:01 Accepted a new connection from spook... (audio) 2010/01/01 08:04 Schedule AVI system started (PID:62) 2010/01/01 08:34 E-mail schedule system started (PID:61) 201O/5/3 28 FTP schedule system started (PID:6D)

2.5 Account

If you wish to allow other people to view the live image captured by this camera, but don't want to allow them to modify system settings, you can give them user-level user name and password, so they can only view the image and can not change any system setting.

This camera supports up to 16 users.

Camera ✓ Video ✓ Network ✓ Motion Detection ✓ System ✓ Account ✓ SDHC

After you selected 'Account', you'll be prompted to input user account information:

Account user1 : operator User List : Login : Password : Confirm password : Authority : Operator Guest Add Modify Remove

The descriptions of every setting in this menu will be given below:

Item Description
User List Lists all users currently available.
Login Input the login name (user name) of this account.
Password Input the password of this user here.
Confirm passwordInput the password of this user here again for confirmation.
AuthoritySelect the privilege of this user: Operator (able to change system settings) or Guest (View images only).
Add Click this button to add the account.
Modify Modify an existing user's information. You have to select a user from user list first.
Remove Removean existing user. You have to select a user from user list first.

Click 'Apply' to save settings and make the new settings take effect.

Please note: only one user (including administrator) will be able to view the image of Network Camera at the same time.

2.6 SDHC

...

Camera Video Network Motion Detection System Account SDHC

After you selected 'System Info.', a sub-menu will appear. There are 4 sub-menus available here:

Status

Space Alarm

File Management

Please click the SD card setting you wish to set then refer to instructions given below:

2.6.1 Status

Here shows the remaining card space for you.

Edimax IC-3110P - Status - 1

bar_stacked | Status | Value (KB) | | :--- | :--- | | Total Space | 3979776 | | Used Space | 1414944 | | Free Space | 2564832 | | Segment Color | Pink | | Blue Segment | Blue | | Percentage (%) | 64% |

2.6.2 Space Alarm

When you're using SD card to store captured image and video clip, you can have this camera to send an E-mail to you when there's only little remaining space left on SD card.

Space Alarm

√ Recipient E-Mail Address :
E-Mail Subject:
SMPT Server :
Sender E-Mail Address :
SMTP Port:
SMTP enable SSLv2/v3 function :
SMPT Authentication :
User Name :
♥ Password :
Reserved Space :

[SD Card Space Alarm] 25 Enable Disable Enable Disable 30 MB Apply Send a test email Copy Mail Config

Please note: If you have set E-mail settings in 'Motion Picture' function, you can click 'Copy Mail Config' button to use the same setting. However, you can use a different setting here.

The descriptions of every setting in this menu will be given below:

Item Description
Recipient E-Mail AddressInput the E-mail address you wish to receive space alarm.
E-Mail Subject Input the title of space alarm E-mail.
SMTP Server Input the SMTP server address you wish to use to send E-mail.
Sender E-Mail AddressInput the sender E-mail address of the space alarm E-mail.
SMTP Port You can set port number according to your mail server.
SMTP enable SSLv2/v3 functionSelect ‘Enable’ if your SMTP server supports SSLv2/v3 such as gmail.
SMTPAuthenticationSelect ‘Enable’ if the SMTP server you’re using requires authentication, and input the username and password below; If the SMTP server you’re using does not require authentication, select ‘Disable’ here. If you’re not sure, ask your ISP or network administrator.
User Name Typethe user name of the user who has the mail account. This setting is necessary when the SMTP server which sends e-mails performs authentication.
Password Typethe password of the user who has the mail account.This setting is necessary when the SMTP server which sends e-mails performs authentication.
Reserved SpaceSelect the amount of SD card space which will be reserved and will not be used from dropdown menu.

Click ‘Apply’ to save settings and make the new settings take effect.

You can click 'Send a test email' button to send a test E-Mail by the configuration you set here.

2.6.3 File Management

You can use this menu to manage the files stored on SD card.

File Management
0-0 image(total 0) Delete Name FirstPage PrevPage NextPage LastPage Size Date SelectAll ClearAll Delete

The descriptions of every setting in this menu will be given below:

Item Description
FirstPage Jump to first page of file list.
PrevPage Jump to previous page of file list.
NextPage Jump to next page of file list.
LastPage Jump to last page of file list.
SelectAll Select all files in this page.
ClearAll Clear all files in this page.
Delete Delete selected files.

Chapter III: Using Surveillance Software

3-1 Installing Network Camera Surveillance Software

The Network Camera surveillance software provides various functions like video recording, after this software is installed, you can use your Network Camera to safeguard your property. Please follow the following instructions to install the surveillance software.

  1. Double click the setup file located in 'xxx' folder in supplied CD-ROM, when the following window appears, click 'Next'.

Setup - IPCam Surveillance Software Welcome to the IPCam Surveillance Software Setup Wizard This will install IPCam Surveillance Software 3.0 on your computer. It is recommended that you close all other applications before continuing. Click Next to continue, or Cancel to exit Setup. Next > Cancel

  1. You can specify the destination folder of software installation, you can just use the default folder, and click 'Next' to continue.

Setup - IPCam Surveillance Software Select Destination Location Where should IPCam Surveillance Software be installed? Setup will install IPCam Surveillance Software into the following folder. To continue, click Next. If you would like to select a different folder, click Browse. C:\Program Files\IPCam Surveillance Software 3.0 Browse... At least 11.4 MB of free disk space is required. < Back Next > Cancel

  1. If you need installation program to create a desktop icon or a quick launch icon for you, click all items you need here, than click 'Next' to continue.

Setup - IPCam Surveillance Software Select Additional Tasks Which additional tasks should be performed? Select the additional tasks you would like Setup to perform while installing IPCam Surveillance Software, then click Next. Additional icons: □ Create a desktop icon □ Create a Quick Launch icon < Back Next > Cancel

  1. Here lists all options you chose in previous steps, if everything's correct, click 'Install' to start installing procedure, or click 'Back' to go back to previous step to modify installing settings.

Setup - IPCam Surveillance Software Ready to Install Setup is now ready to begin installing IPCam Surveillance Software on your computer. Click Install to continue with the installation, or click Back if you want to review or change any settings. Destination location: C:\Program Files\IPCam Surveillance Software 3.0 Additional tasks: Additional icons: Create a desktop icon < Back Install Cancel

  1. The installing procedure will take some time, please be patient.

Setup - IPCam Surveillance Software Installing Please wait while Setup installs IPCam Surveillance Software on your computer. Extracting files... C:\Program Files\IPCam Surveillance Software 3.0\Image\bg.bmp Cancel

  1. When you see this window, it means the software installing procedure is complete. Please click 'Finish' to finish the procedure (Network Camera surveillance software will start after you click 'Finish' button, if you want to start it later, uncheck 'Launch IPCam Surveillance Software' box).

Setup - IPCam Surveillance Software Completing the IPCam Surveillance Software Setup Wizard Setup has finished installing IPCam Surveillance Software on your computer. The application may be launched by selecting the installed icons. Click Finish to exit Setup. Launch IPCam Surveillance Software Finish

3-2 Using Network Camera surveillance software

You can click 'IPCam Surveillance Software' icon from desktop, quick launch bar, or start menu to start the Network Camera surveillance software.

Before you start:

Network Camera surveillance software will only work when your monitor's resolution is '1024 x 768'. Please change the resolution before you use Network Camera surveillance software, or it won't

Here are descriptions for all components of Network Camera surveillance software:

Video displaying area No Signal No Signal No Signal No Signal Language IP Camera Display layout Full screen / Scan Zoom Out / Zoom In PTZ Control / Home Close window (stop surveillance) / Minimize window Message display box Recording / System configure Playback / Snap shot

You can put the mouse cursor on a certain component and see its button name, and here're detailed descriptions of all buttons:

Item Description
Video displaying areaThe image of all connected cameras will be displayed here.
Language Select a language from this dropdown menu to change display language.
Display layoutEdimax IC-3110P - Before you start: - 2Change camera image display layout (Click a layout icon to change camera display layout). There are 8 kinds of available display layouts.
Full screenEdimax IC-3110P - Before you start: - 3Click this button to switch to full screen mode (only display all camera's image), press ‘ESC’ key to quit full screen mode.
ScanEdimax IC-3110P - Before you start: - 4Click this button and the Network Camera surveillance software will switch displaying the image of all connected camera automatically. Click this button once to activate scan function (scan icon will become blue ), click again to stop scanning (scan icon will become white ?
Zoom outEdimax IC-3110P - Before you start: - 5Zoom-out (To see more objects).This function is only available for supported cameras.
Zoom InEdimax IC-3110P - Before you start: - 6Zoom-in (Too see more details).This function is only available for supported cameras.
PTZ controlEdimax IC-3110P - Before you start: - 7There are 8 directions in PTZ control ring. If the camera you connect support PTZ, you can use PTZ control ring to change the direction that camera points to.This function is only available for supported cameras.
HomeEdimax IC-3110P - Before you start: - 8Click this button to return the camera to ‘Home’ (default) position.This function is only available for supported cameras.
RecordingEdimax IC-3110P - Before you start: - 9Start video recording.
ConfigureEdimax IC-3110P - Before you start: - 10Software / camera configuration.
PlaybackEdimax IC-3110P - Before you start: - 11Playback a recorded video file.
SnapshotEdimax IC-3110P - Before you start: - 12Take a snapshot of current camera.
Message displayDisplays all system messages like camera is disconnected etc.
Close window (stop surveillance)Edimax IC-3110P - Before you start: - 13Terminates Network Camera surveillance software.
Minimize windowEdimax IC-3110P - Before you start: - 14Minimizes Network Camera surveillance software window.
Video displaying areaDisplays the image of all cameras by the display layout you selected.

3-3 Configure Network Camera surveillance software

3-3-1 Configure cameras

Before you use this Network Camera surveillance software, you must configure the camera(s) you wish to connect. Please click 'System configure' button and a popup menu will appear:

Configure Cameras

General Options

Please select 'Configure Cameras' to configure cameras:

Note: If you're prompted by a windows security alert which asks you if you want to block 'IPCamViewer' program, please click 'Unblock' button, of Network Camera surveillance software will not be able to function correctly.

Windows Security Alert To help protect your computer. Windows Firewall has blocked some features of this program. Do you want to keep blocking this program? Name: IPCamViewer Publisher: Unknown Keep Blocking Unlock Ask Me Later Windows Firewall has blocked this program from accepting connections from the Internet or a network. If you recognize the program or trust the publisher, you can unblock it. When should I unblock a program?

3-3-1-1 'Camera' tab

In this tab you can configure all cameras you wish to connect. Up to 16 cameras can be connected simultaneously:

Configure Cameras Channel Channel 1 Channel 2 Channel 3 Channel 4 Channel 5 Channel 6 Channel 7 Channel 8 Channel 9 Channel 10 Channel 11 Channel 12 Channel 13 Channel 14 Channel 15 Channel 16 Camera Schedule Recording Audio Motion Recording ○ Edimax PnV ○ DDNS Free ○ Manual Edimax PnV Camera ID Password DDNS Free Camera ID Password Camera Configuration 1 Name IC-7110W Model Edimax_IC7110W IP Address 192.168.4.60 Username admin Web Port 80 Password ****** Video Format MJPEG Reset Camera Search Camera Name IP Model IC-BD486C 192.168.4.60 Edimax_IC7110W Select Refresh OK Cancel

Here are the descriptions of all setting items:

Item Description
Channel Select the channel number you wish to set.
Camera Search All cameras found on your local network will be displayed in ‘Camera Search’ box.
Select Select a camera listed in ‘Camera Search’ box, and click ‘Select’ button to fill all parameters of selected camera in every camera configuration fields.
Refresh Rescan all cameras on your local network. If you didn't see the camera you expected in ‘Camera Search’ box, or new cameras has been joined to your local network after last scan.
Name* Input the name of camera here. Default value is the first 6 bytes of camera’s MAC address, you can change the
name of camera so you can remember the camera's location of purpose easily.
Model Displays the model of selected camera, this field can not be changed.
IP* Input the IP address of camera.
Username* Input the user name of camera.
Web Port* Input the web port of the camera. By default it's ‘80’.
Password Input the password of camera. Default value is ‘1234’. You should change the password if you changed the password of selected camera.
Video Format** Select the video encoding format of this camera (MJPEG or MPEG4).
Reset Clear all fields in ‘Camera Configuration’ section.
OK Save settings in this tab.
Cancel Discard all settings in this tab.

*: It's recommended to use 'Select' button to fill the content of this field.
**: Only available for cameras support this function.

After you've set all channels you wish to set, click 'OK' to save settings, and if everything's correct, you'll see the camera's image in Network Camera surveillance software's main menu:

2008.31 08 18:37:04 2 No Signal 3 No Signal 4 No Signal System Event Log

3-3-1-2 Schedule Recording

In this tab, you can setup scheduled video recording, so you can record the video captured by all cameras you have by a pre-defined schedule.

Configure Cameras Channel Channel 1 Channel 2 Channel 3 Channel 4 Channel 5 Channel 6 Channel 7 Channel 8 Channel 9 Channel 10 Channel 11 Channel 12 Channel 13 Channel 14 Channel 15 Channel 16 Camera Schedule Recording Audio Motion Recording One Time Schedules 2009/07/10 11:03:27 - 2009/7/10 11:10:27 New Edit Delete Weekly Schedules [ Sun Mon Tue Wed Thu Fri Sat ] 00:00:00 - 23:59:59 New Edit Delete OK Cancel

Here are the descriptions of all setting items:

Item Description
Channel Select the channels number you wish to set.
One Time SchedulesYou can specify the one-time schedule for selected camera; this schedule will be executed once only.
New (One Time Schedules)Click this button and a new window will appear:Edimax IC-3110P - 3-3-1-2 Schedule Recording - 2Please specify the time duration of this one-time schedule (the date and time of ‘From’ and ‘To’), then click ‘OK’ to save settings.Please note you must set a schedule that will be happened in the future, you can not set a schedule in the past.
Edit You can modify a scheduled recording item. Select a schedule in ‘One Time Schedules’ list, and click ‘Edit’ button to edit the start and end time of this schedule.
Delete Delete a selected schedule item.
New(Weekly Schedules)Click this button and a new window will appear:Edimax IC-3110P - 3-3-1-2 Schedule Recording - 3You can define recording schedule that will be executed at the specified time of certain weekday(s) in a week.Please check all weekdays that applies, and set the start time in ‘From’ field. You can set the duration of video recording in ‘Period’ field (format is HH:MM:SS), and the end time will be calculated automatically and displayed in ‘To’ field. You can also click ‘All Time Record’ button to define a recording schedule that will be executed every weekday, from 12:00:00AM to 11:59:59PM.Click ‘OK’ to save changes.
Edit You can modify a scheduled recording item. Select a schedule in ‘One Time Schedules’ list, and click ‘Edit’ button to edit the start and end time of this schedule.
Delete Delete a selected schedule item.
OK Save settings in this tab.
Cancel Discard all settings in this tab.

3-3-1-3 Audio

For cameras that support audio, you can use this tab to decide if you wish to hear the audio captured by selected camera.

Configure Cameras Channel Channel 1 Channel 2 Channel 3 Channel 4 Channel 5 Channel 6 Channel 7 Channel 8 Channel 9 Channel 10 Channel 11 Channel 12 Channel 13 Channel 14 Channel 15 Channel 16 Camera Schedule Recording Audio Motion Recording Audio ✓ Mute Audio ☐ Record Video Only OK Cancel

Here are the descriptions of all setting items:

Item Description
Channel Select the channel number you wish to set.
Mute Audio Checkthis box and the Network Camera surveillance software will not play the audio captured by this camera.
Record Video OnlyCheck this box and the Network Camera surveillance software will not record the audio captured by this camera.
OK Save settings in this tab.
Cancel Discard allsettings in this tab.

3-3-1-4 Motion Record

With this function activated, only motions captured by the camera will be recorded, so you don't have to waste hard disk storage space on images you don't need to pay attention to.

WARNING: For applications that security is highly concerned, it's not recommended to use this function since some tiny changes you may need to know may not be able to trigger the camera and the camera will not start recording.

Configure Cameras Channel Channel 1 Channel 2 Channel 3 Channel 4 Channel 5 Channel 6 Channel 7 Channel 8 Channel 9 Channel 10 Channel 11 Channel 12 Channel 13 Channel 14 Channel 15 Channel 16 Camera Schedule Recording Audio Motion Recording Motion Record Enable Disable Recording Time 10 seconds Invoke alarm when motion is triggered Send mail when motion is triggered OK Cancel

Here are the descriptions of all setting items:

Item Description
Channel Select the channel number you wish to set.
Enable Enable motion record function.
DisableDisable motion record function.
Recording Time Select the time duration that camera will record when a motion has been detected from dropdown menu in seconds.
Invoke alarm when motion istriggeredSend an alarm when a motion has been detected by the camera.
Send mail when motion is triggeredSend an email to a pre-defined address when a motion has been detected by the camera.
OK Save settings in this tab.
Cancel Discard all settings in this tab.

3-3-2 General Settings

You can set system-wide settings of this Network Camera surveillance software in this menu.

3-3-2-1 'General' tab

All general settings like file storage directory and recording spaces can be set here.

General Options General E-Mail Setting Security About Directory Information Data Directory C:\Users\JesseLiu\Documents Browse Free Recording Space 14243 MB General Settings Max Video File Size 50 MB Scan Time 3 second(s) Cycle Recording Disable 確定 取消

Here are the descriptions of all setting items:

Item Description
Data Directory Setthe directory (folder) you wish to store the recorded video and captured image. You can click ‘Browse’ button to pick a directory in your hard disk.
Free Recording SpaceDisplays remaining storage space.
Max Video File SizeDefines the maximum file size of every video file. When the size of file exceeds this value, Network Camera surveillance software will open another file to record thevideo.
Scan Time Definethe time period to pause between every camera switch when you activate ‘Scan’ function.
Cycle RecordingYou can decide the behavior when hard disk space is full:Disable: Do not overwrite recorded video files.Enable: Overwrite recorded video files.
OK Save settingsin this tab.
Cancel Discard allsettings in this tab.

3-3-2-2 'E-Mail Setting' tab

If you want to use motion detection function and wish to get an email that contains the image captured by the camera, please setup your email related parameters here first.

General Options General E-Mail Setting Security About E-Mail Subject Recipient E-Mail Address New Edit Delete Sender E-Mail Address SMTP Server SMTP Port 25 SMTP Auth Enable Disable SMTP Account SMTP Password 確定 取消

Here are the descriptions of all setting items:

Item Description
E-Mail Subject Specify the subject of sending email.
Recipient E-Mail AddressHere lists all email addresses you set.
New Click this button and you’ll be prompted to input the email address. Click ‘OK’ to save changes.
Edit Select an email address from ‘Recipient E-Mail Address’box, and click ‘Edit’ to edit the email address.
Delete Delete selected email address.
Sender E-Mail AddressSpecify the email address of email sender.
SMTP Server Specify the IP address or host name of the SMTP server you wish to use. For most of ISPs they will only allow its subscriber to use their SMTP server, if you don’t know which SMTP server you should use, please refer to the setting of your email software or ask your ISP / network administrator.
SMTP port Specify the port number of the SMTP server you wish to use here. By default (and the setting of most of SMTP servers) it’s ‘25’.
SMTP Auth Select ‘Enable’ if your SMTP server requires authentication, select ‘Disable’ if it’s not required. If you don’t know if your SMTP server requires authentication, please refer to the setting of your email software or ask your ISP / network administrator.
SMTP Account Input the SMTP account (username) of your SMTP server here. In most cases, it’s the same with your POP3 username (the one you used to receive email). Please refer to the setting of your email software or ask your ISP / network administrator if you’re not sure about this.
SMTP Password Input the SMTP password of your SMTP server here. In most cases, it’s the same with your POP3 password (the one you used to receive email). Please refer to the setting of your email software or ask your ISP / network administrator if you’re not sure about this.
OK Save settings in this tab.
Cancel Discard all settings in this tab.

3-3-2-3 Security

If you don't want other people to access this Network Camera surveillance software, you can set a password to protect it.

You'll need to input the password every time you wish to use this Network Camera surveillance software:

Authentication required Please input password Password: OK Cancel

To set password, please use 'Security' tab in 'General Options' menu:

General Options General E-Mail Setting Security About Security Enable Disable Password Confirm Password 確定 取消

Here are the descriptions of all setting items:

Item Description
Enable Requires password authentication when this software starts.
DisablePassword authentication is not required when t software starts.
Password Input the password you wish to use here.
Confirm PasswordInput the password you wish to use here again.

3-3-2-4 About

This tab shows the version number of the Network Camera surveillance software you're using.

General Options General E-Mail Setting Security About IP Camera Surveillance Software Information Version: v3.0.4.6

3-4 Change Display Layout

This Network Camera surveillance software provides 8 kinds of display layout:

Edimax IC-3110P - 3-4 Change Display Layout - 1

natural_image Grid of nine abstract geometric shapes with varying internal and square outlines (no text or symbols)

Every layout displays different number of camera and camera arrangement, you can click the icon that presents a specific kind of layout, and the video displaying area will change accordingly.

Layout style 1: 1Camera onlyEdimax IC-3110P - 3-4 Change Display Layout - 2Displays the video of 1 camera only.Edimax IC-3110P - 3-4 Change Display Layout - 3
Layout style 2: 4CamerasEdimax IC-3110P - 3-4 Change Display Layout - 4Displays the video of up to 4 cameras.Edimax IC-3110P - 3-4 Change Display Layout - 5
Layout style 3: 6 CamerasEdimax IC-3110P - 3-4 Change Display Layout - 6Displays the video of up to 6 cameras.Edimax IC-3110P - 3-4 Change Display Layout - 7
Layout style 4: 8 CamerasEdimax IC-3110P - 3-4 Change Display Layout - 8Displays the video of up to 8 cameras.Edimax IC-3110P - 3-4 Change Display Layout - 9
Layout style 5: 9 CamerasEdimax IC-3110P - 3-4 Change Display Layout - 10Displays the video of up to 9 cameras.Edimax IC-3110P - 3-4 Change Display Layout - 11
Layout style 6: 10 CamerasEdimax IC-3110P - 3-4 Change Display Layout - 12Displays the video of up to 10 cameras.Edimax IC-3110P - 3-4 Change Display Layout - 13
Layout style 7: 13 CamerasEdimax IC-3110P - 3-4 Change Display Layout - 14Displays the video of up to 13 cameras.Edimax IC-3110P - 3-4 Change Display Layout - 15
Layout style 8: 16 CamerasEdimax IC-3110P - 3-4 Change Display Layout - 16Displays the video of up to 16 cameras.Edimax IC-3110P - 3-4 Change Display Layout - 17

3-5 Full-screen mode

If you want to use all available spaces on your monitor to display surveillance image, you can click 'Full Screen' button to switch display mode to full-screen mode.

English

To exit full-screen mode, press 'ESC' key.

3-6 Scan

If you have more than one camera configured, and you wish to switch the displaying image between cameras, you can click 'Scan' button to switch between all configured cameras.

NOTE: If a camera is configured but disconnected, it will still be displayed in a scan sequence (you'll see nothing and you'll see 'Disconnected' text displayed at the upper-left corner of display image).

English

Click 'Scan' button once to activate scan function (scan icon will become blue), click again to stop scanning (scan icon will become white).

3-7 Zoom-in / Zoom-out

For cameras that support zoom-in / zoom-out function, you can use this function to see more objects that fall in the scope of camera's view, or enlarge the image size of a certain object to see its detail.

English - +

Please select a camera in video displaying area by clicking on its image, then click button to see more objects that fall in the scope of camera's view, or click to enlarge the image size of a certain object to see its detail (Before zoom-in, you may need to use PTZ buttons - described in next section) to find an object you wish to see its detail).

3-8 PTZ

For cameras that support pan - tilt function ( but this model doesn't support PTZ function), you can change the position that camera points to, to see different places that fall in the scope of camera's view.

English

Please select a camera in video displaying area by clicking on its image, and then click the directions you wish the camera to move to (total 8 directions available). Click 'Home' button (☐) to return to camera's home (default) position.

3-9 Snapshot

You can take a snapshot of selected camera and save it to 'Snapshot' sub-folder of pre-defined data directory.

Edimax IC-3110P - 3-9 Snapshot - 1

natural_image Four gray button icons with icons: video camera, wrench, play button, and camera icon (no text or symbols)

Click snapshot button once to take a snapshot; you can take as much snapshot as you want before hard disk is full.

3-10 Recording

You can start video recording of selected camera manually by clicking 'Start Recording' button:

Edimax IC-3110P - 3-10 Recording - 1

natural_image User interface buttons including video camera, wrench, play, and camera (no text or symbols)

When recording starts, you'll see a message displayed in message displaying box like '1/1 10:00:00, Camera 2 Start Manual', which means camera 1 starts recording manually on 1/1 at 10:00:00.

To stop recording, click 'Start Recording' button again, and you'll see a message displayed in message displaying box like '1/1 10:00:00, Camera 2 Stop Manual'.

3-11 Video Playback

You can playback all recorded video by clicking this button.

Edimax IC-3110P - 3-11 Video Playback - 1

natural_image User interface buttons including video camera, wrench, play button, and camera (no text or symbols)

A new window will appear:

Playback Time Search From 5/ 1/2008 12:00:00 PM To 5/30/2008 12:00:00 PM Search Motion Search From 5/ 1/2008 12:00:00 PM To 5/30/2008 12:00:00 PM Search Channel File Name 1 Manual_2008-5-20_12-0-13.avi 1 Manual_2008-5-20_12-5-9.avi 1 Schedule_2008-5-20_11-49-41.avi 1 Schedule_2008-5-20_11-50-58.avi 1 Schedule_2008-5-20_11-52-13.avi Play OK

You have to search the video file before you can play it. There are two kinds of video search: Time Search (search all videos file that falls in a specific period of time) and Motion Search (search all videos recorded by motion detection function and falls in a specific period of time).

Please define the start and end date / time of the time period you wish to search, and then click 'Search' button (of 'Time Search' of 'Motion' Search'). All found videos will be displayed, select the video you wish to play and click 'Play' button to playback.

Chapter IV: How to Access the Network Camera Remotely with iPhone & Android Phones

IC-3110 series features smart phone support for iPhone users and Android phone users to monitor their home using Edimax Network-Cameras.

Please check following instruction for installation. The following instruction applies to all Edimax routers

Step1:

Ensure My-PC is Internet-ready via Router

Step 2:

Check with your ISP (Internet Service Provider) whether a Public and fixed IP address is assigned to you. An IP address is like an unique phone number that is totally different from all the others' for calling a particular person. You could browse the Internet or monitor your home over the Internet with iPhone by using this unique IP address. Therefore, an unique IP address is a Public and fixed IP address. With this, it's much easy for iPhone monitoring your home. For example, an IP address looks like numbers separated with a dot as: 192.168.2.3

(1) Fixed and public IP address:

All IP addresses different from the following are fixed and public IP address 10.0.0.0 - 10.255.255.255

172.16.0.0 - 172.31.255.255

192.168.0.0 - 192.168.255.255

Write down this IP address and go to Step 3. In this guide, we use a hypothetical IP address, 61.61.61.1 (yours is different)

(2) Dynamic IP address

If your ISP service staff cannot tell you what IP address is for you, you can still monitor your home with iPhone, but it turns more complicated.

Your IP address for browsing Internet will change by hours or by days.

Over 90% chance, you may get a dynamic IP address. There is a solution called Dynamic DNS (DDNS) for free. With this, you could register a name like http://my-name.dyndns.org for example to find out Edimax network camera

in the I-Phone. To apply for this, refer to the Appendix "How to apply for a free DNS account in the http://www.dyndns.org" In this guide, we assume you have already got http://my-name.dyndns.org. (yours may vary) and go to Step 3.

Step 3:

Configure the 1^st Camera based on the following:

Configuration for the 1st camera LAN Audio/Video E-mail & FTP 1 Apply Click "LAN" LAN Network Type DHCP Static IP Address IP Address 192.168.2.10 Change the IP to 192.168.2.10 Subnet Mask 255.255.255.0 Gateway 192.168.2.1 This is the IP of Edimax router Primary DNS 168.95.1.1 Second DNS AV Control Port 4321 Web port 80 "Web port" 80 is preserved for the 1st camera 2nd IP-Camera

Configure the 2^nd Camera based on the following:

Configuration for the 2nd camera LAN Audio/Video E-mail & FTP 1 Apply Click "LAN" LAN Network Type DHCP Static IP Address IP Address 192.168.2.20 Change the IP to 192.168.2.20 Subnet Mask 255.255.255.0 Gateway 192.168.2.1 This is the IP of Edimax router Primary DNS 168.95.1.1 Second DNS AV Control Port 4321 Web port 82 "Web port" 82 is preserved for the 2nd camera

Configure the Broadband Router based on the following:

Quick Setup | General Setup | EZ View | Status | Tools | Home / General Setup / Advanced Settings / NAT / Virtual Server 1 Go to "Virtaul server" setup page Enable Virtual Server Private IP Computer name Private Port Type/Public Port Comment 192.168.2.10 <<----Select----- 80 Both 80 1st-camera Enter required information for the 1st camera and click "Add" Enable Virtual Server Private IP Computer name Private Port Type/Public Port Comment 192.168.2.20 <<----Select----- 82 Both 82 2nd-camera Enter required information for the 2nd camera and click "Add" Current Virtual Server Table: NO. Computer name Private IP Private Port serve Type/Public Port Comment Select 1 192.168.2.10 80 TCP+UDP 80 1st-camera 2 192.168.2.20 82 TCP+UDP 82 2nd-camera Click "Apply"

4.1 iPhone App Installation

(1) Please download 'Ediview' application from Apple's Appstore

ip camera viewer Edimax Ediview 11 Ratings FREE > VIGO Technology (Hangzhou) Ltd.(... iViewer No Ratings FREE > SEEnergy Corp. NVR Mobile Viewer No Ratings FREE > IP Helper D-Link Cameras View... $0.99 > No Ratings IP Helper D-Link Camera View... $1.99 > No Ratings Featured Categories Top 25 Search Updates

(2) You can launch EdiView by clicking 'EdiView' icon. You'll see welcome screen and please wait for few seconds

DemoS EdiView

(3) When you launch EdiView, it will attempt to connect to existing configured network cameras. Please make sure you're connected to wireless access

point if your Edimax network camera is located on your local area network.

Live Loading Loading Loading Live Events Map Cameras

If you want search for network cameras on your local area network, or you want to add an Ediamx network camera on Internet, please click 'Cameras' button to abort and setup network camera manually

(4) To view more than 4 network camera's live image on your iPhone, click button on upper-left corner, and you can view up to 12 network camera's live image at the same time

Edimax IC-3110P - iPhone App Installation - 4

You can click this button repeatedly to switch 1 camera / 4 cameras / 12 cameras view.

(5) You can manage network cameras in 'Cameras' list. To add a new network camera, click 'Add New Camera'.

Edit Cameras Cameras IC-BD3C08 Add New Camera Live Events Map Cameras

(6) EdiView will search for network camera on your local area network, and list all network cameras found here.

Cameras Search Cameras Choose a Camera... Add Camera Manually > Live Events Map Cameras

To add an network camera manually or add an network camera on Internet, click 'Add Camera Manually' button.

(7) In this page, you can input network camera's parameters manually

Cancel IC-BD3C08 Done Camera Type Cloud IP Camera Name IC-BD3C08 IP 192.168.98.103 Port 80 Username admin Password ••••• Brightness 1 > Saturation 4 > Sharpness 5 >

Camera Type: Switch operating mode between Cloud and IP. In cloud mode you have to input Cloud ID**; In IP mode you have to input IP address or host name of network camera.

Camera Name: You can define a name for this network camera to help you to remember the purpose / location of this network camera.

IP: Input network camera's IP address or host name.

Port: Input network camera's port number, generally it's '80'.

User Name: Input the user name of network camera. Default user name is 'admin'

Password: Input the password of network camera. Default user name is '1234'

(8) You can also setup video parameters of this network camera.

Cancel IC-BD3C08 Done IP 192.168.98.103 Port 80 Username admin Password ••••• Brightness 1 > Saturation 4 > Sharpness 5 > Video Quality Normal > Tilt Speed 3 >

Brightness: Select video brightness (1 to 5, darkest to brightest).

Saturation: Select video saturation (1 to 5, lowest to highest).

Sharpness: Select video sharpness (1 to 5, lowest to highest).

Video Quality: (Highest to Lowest, select a lower video quality will help when network speed is slow).

Tilt Speed: Select camera pan & tilt movement speed. Click 'Done' to save changes

(9) To delete an existing IP camera, click 'Edit' button. Click ☑ of the IP camera you wish to delete

Done Cameras Cameras RD Ken IC-BD3C08 Add New Camera

(10) Click 'Delete' button to delete IP camera

Done Cameras Cameras RD Delete Ken IC-BD3C08 Add New Camera Live Events Map Cameras

(11) Now you can back to 'Live' menu, if you see a snapshot appear, it indicates the network camera is correctly configured.

Live Gesture IC-BD3C08 Live Events Map Cameras

Click snapshot picture to enlarge video view

(12) If network camera you connected supports pan/tilt control, you can click the button on the upper-right corner to switch to 'Gesture' mode and use your finger to slide on the live image view, and network camera will move as your finger slides

Live Gesture IC-BD3C08 Live Events Map Cameras

A white arrow will also appear to indicate the direction of camera movement.

Please note: If the button appears on upper-right corner shows 'Switch', you can't move camera.

(13) To view events (motions detected by network camera), click 'Events' button below in network camera's live view

Events IC-BD3C08 Live Events Map Cameras

All network cameras will be listed and you can choose one to see its events list.

(14) All events of selected network camera will be listed here. You can click an event to see enlarged photo.

Events IC-BD3C08 2011/1/1 8:01:51 2011/1/1 8:01:59 2011/1/1 8:02:22 2011/1/1 8:02:27 2011/1/1 8:02:41

(15) Event's snapshot and event date / time will be displayed. Click the button with network camera's name (upper-left corner) to go back.

IC-BD3C08 IC-BD3C08 2011/1/1 8:01:51

(16) You can use this function to mark your network camera on Google map, so you can locate them and remember their physical location easily.

Edit Cameras Cameras IC-BD3C08 Add New Camera Live Events Map Cameras

Please note that you need active Internet connection to show map on your iPhone. Click 'Map' button at the bottom of your iPhone to access Map menu.

(17) Google map will be shown on your iPhone, and it will attempt to locate your current location by GPS and network.

Map Locate Lake Ladysmith Prer Cameron hetek New Auburn Bloomer Cornell Medfor Chippewa Falls Cadott Thorp Abbots found Lake Hallie Seymour Eau Claire Fall Creek Augusta Neillsville Sper ndovi Google Osseo Live Events Map Cameras

If you're using your iPhone indoor, your iPhone may fail to locate your location. You can still use your finger to drag the map and find your current location manually.

If the network camera you're about to mark on the map does not locate at your current location, you can also use your finger to drag the map and find the location where your network camera is installed.

A red pin indicating the location of network camera will be placed at the center of map.

(18) When you found the location where network camera is installed, click 'Locate' button located at upper-right corner of your iPhone, and a camera list will be shown

Map Locate Ladysmith 8 Prest Cameron New Auburn Bloomer Cornell Medfo Cancel Done IC-BD3C08

Select the network camera you wish to mark on the map, and click 'Done' when done.

4.2 Android App installation

(1) To install Ediview application, launch ‘Market’. (In your Android device’s ‘All apps’ menu)

All apps Learn More Mail Maps Market Messages MSN: Mercury (F... Music Navigation News News and Weather Note Everything One Eye Beta PDF Viewer Peep People Phone

(2) Click magnifier icon at upper-right corner of Android market, and input 'Ediview' in search field

ediview CATEGORIES FEATURED TOP FREE tripadvisor® Games 1 2 3 4 5 6 7 8 9 0 q w e r t y u i o p ! @ # $ % & * / a s d f g h j k l ↑ - " ' ( ) - z x c v b n m ↓ EN ; — : 12#

(3) You should able able to find Ediview utility (If not, please check spelling), and click 'Download' to download and install Ediview

7:05 PM Ediview 1 results APPS Ediview Edimax ★★★★★ Free

(4) Android will prompt you to confirm installation, please click 'Install' button below to start installation

EdiView Do you want to install this application? Allow this application to: Your location fine (GPS) location Network communication full Internet access Storage modify/delete SD card contents Phone calls read phone state and identity System tools prevent phone from sleeping Install Cancel

(5) Please be patient while EdiView is being installed.

EdiView Installing...

(6) When EdiView utility is successfully installed, you'll see this message. Click 'Open' to launch EdiView utility now, or click 'Complete' to launch EdiView utility later

EditView Application installed Open Done

(7) You can launch EdiView by clicking 'EdiView' icon in 'All Applications

All apps Calculator Calendar Call history Camcorder Camera Clock Desk Clock EasyCard EdiView ES File Explorer Facebook Flash Player Settings Flashlight FM Radio Footprints Friend Stream Phone

(8) When you launch EdiView, it will search for all Edimax network cameras on your network. Please make sure you're connected to wireless access point if your Edimax network camera is located on your local area network.

Add Network Camera Search Results Manually Done

If you want to add a Ediamx network camera on Internet, please click 'Manually' button to abort and setup network camera manually

(9) In this page, you can input network camera's parameters manually. Name: You can define a name for this network camera to help you to remember the purpose / location of this network camera

Cloud / IP Mode Switch: Click this button to switch operating mode between Cloud and IP. In cloud mode you have to input Cloud ID**; In IP mode you have to input IP address or host name of network camera

User Name: Input the user name of network camera. Default user name is 'admin'

Password: Input the password of network camera. Default user name is '1234'

Click 'Add' to add a new network camera with parameters listed above.

Add Network Camera Manually 22:31 Name Cloud / IP Mode Switch Cloud Cloud ID User Name admin Password 1234 Cancel Add

(10) When an network camera has been added successfully, you'll see it appear in EdiView utility's camera list

List 22:33 Cam1

Please repeat last step to add more network cameras you wish to connect. To repeat last step, press ‘Menu’ key on your Android device and click ‘Add’ button

(11) If the network camera is connected, you'll see a picture appear. Click the Picture to view live image

List 22:35 Cam1 IDIMAX

If there are new events available, click icon

Edimax IC-3110P - If you want to add a Ediamx network camera on Internet, please click 'Manually' button to abort and setup network camera manually - 4

To configure network camera's parameters, click Icon

Edimax IC-3110P - If you want to add a Ediamx network camera on Internet, please click 'Manually' button to abort and setup network camera manually - 5

(12) When you click an network camera in camera list, you'll see its live image. Like this. You can hold your Android device horizontally to enlarge network camera's live image view.

If the network camera you connected supports Pan & Tilt, you can click

Edimax IC-3110P - If you want to add a Ediamx network camera on Internet, please click 'Manually' button to abort and setup network camera manually - 6

button and use your finger to slide on the live image to the direction

you wish to move.

1 Live View Cam1

(13) To take a snapshot of current live image and save it on your Android device, click 📋 button. You'll see 'Save Snapshot' message appear, which indicates a snapshot has been taken.

1 Live View Save Snapshot

(14) If you have more than 1 network cameras, you can click 📄 button and you can see the image of up to 4 network cameras at the same time; Click on the camera's image to enlarge it

4 Live Views Cam1

You can also click 📄 button to see up to 12 network cameras at the same time.

(15) To configure the video display parameters of this network camera, click button, and you can drag the slide bar to configure parameters:

Brightness: Configure video brightness

Saturation: Configure video saturation.

Sharpness: Configure video sharpness.

Video Quality: Configure video quality by setting a lower (left) or higher (right) image quality. When network speed is slow, using a lower video quality will help.

Pan & Tilt speed: configure the camera moving speed when you use pan / tilt function

Click 'Done' button when you finish, or click 'Cancel' to abort. You'll see the result after you click Done'.

1 Live View Cancel Done Brightness Saturation Sharpness Video Quality Pan / Tile Speed

(16) When a new event (movement) has been detected by network camera, you'll see 📄con appear in network camera list. You can click it to see events.

List Cam1 IDIMAX

(17) All events will be displayed here, with the time which triggered this event. Click on the event to see enlarged picture

Events Cam1-20111002223630 Cam1-20111002223635 Cam1-20111002223641 Cam1-20111002223708 Cam1-20111002223713

(18) The image of this event will be displayed with the time triggered this event. To see enlarged picture, hold your Android device horizontally

2011/10/02 22:36:35

(19) To save a snapshot of this event, click button. You'll see 'Saved event image successfully' message to prompt you that image has been saved successfully.

Events 2011/10/02 Saved event image successfully. 22.56.55

(20) When you're in camera list, press 'Menu' button on your Android device. A menu will appear on the bottom of EdiView utility.

Edimax IC-3110P - If you want to add a Ediamx network camera on Internet, please click 'Manually' button to abort and setup network camera manually - 15

See live images of network cameras

Edimax IC-3110P - If you want to add a Ediamx network camera on Internet, please click 'Manually' button to abort and setup network camera manually - 16

Use google map to locate network cameras

Edimax IC-3110P - If you want to add a Ediamx network camera on Internet, please click 'Manually' button to abort and setup network camera manually - 17

Add a new network camera

Edimax IC-3110P - If you want to add a Ediamx network camera on Internet, please click 'Manually' button to abort and setup network camera manually - 18

Reload network camera list

List 22:59 Cam1 Live Map Add Refresh

(21) You can use this function to mark your network camera on Google map, so you can locate them and remember their physical location easily. Please note that you need active Internet connection to show map on your Android device.

List 22:59 CAM1 Live Map Add Refresh

Click 'Map' button at the bottom of your Android device to access Map menu

(22) Google map will be shown on your Android device, and it will attempt to locate your current location by GPS and network

Edimax IC-3110P - If you want to add a Ediamx network camera on Internet, please click 'Manually' button to abort and setup network camera manually - 21

natural_image Blue circular component on grid background, no text or symbols visible

If you're using your Android device indoor, your A may fail to locate your location. You can still use your finger to drag the map and find your current location manually.

If the network camera you're about to mark on the map does not locate at your current location, you can also use your finger to drag the map and find the location where your network camera is installed

A blue pin indicating the location of network camera will be placed at the center of map.

(23) When you found the location where network camera is installed, press 'Menu' button on your Android device and click 'Locate' button and a camera list will be shown. Select the network camera you wish to mark on the map.

Map View 23:00 CAM1 Google

4.3 Web browser installation

Please make sure your web browser supports JAVA first. If your web browser does not support JAVA, you can install JAVA from website: www.java.com and get JAVA software.

(If your web browser does not support JAVA, you'll see this message when you try to use JAVA browser)

Java Applet is not Supported by your Browser. Please visit http://www.java.com/ to download.

(1) If you're not login Windows as system administrator, please use system administrator to launch Internet Explorer. To do so, right-click Internet Explorer icon and click 'Run as administrator'.

NOTE: You must use 32-bit Internet Explorer!

Default Programs Desktop Gadget Gallery Internet Explorer Windows Anytim Windows DVD M Windows Fax and Windows Media Windows Media Windows Update XPS Viewer Accessories ExpressView Games Internet Camera Internet Camera Maintenance Oracle VM Virtua Ralink Wireless Startup Open Run as administrator Open file location Unpin from Taskbar Pin to Start Menu Restore previous versions Send to Cut Copy Delete Rename Properties

(2) Input the following web address in your web browser's address bar: "XXXXXXXXXXXX.myedimax.com".

WhereXXXXXXXXXX is the 12 characters of your Edimax network camera's MAC address. If you don't know the MAC address of your Edimax IP camera, you can log onto network camera's web configuration menu and click "System" -> "System Information" -> "Status"-->"LAN" to see its MAC address.

Address 001F1FBD3C08.myedimax.com Search for "001F1FBD3C08.myedimax.com"

(3) If you see this message, click 'Run' to continue

Warning - Security The application's digital signature cannot be verified. Do you want to run the application? Name: viewer Publisher: UNKNOWN From: http://www.myedimax.com □ Always trust content from this publisher. Run Cancel This application will run with unrestricted access which may put your personal information at risk. Run this application only if you trust the publisher. More Information...

(4) Please wait while JAVA loads, and please input your network camera's password to login. Default password is '1234'. Click 'OK' to continue.

Please enter your password : OK IDIMAX

(5) You should be able to see the image of network camera now.

Edimax IC-3110P - NOTE: You must use 32-bit Internet Explorer! - 5

natural_image Decorative photo featuring stuffed animals and a 'welcome' sign, with no readable text or symbols in the main scene.

You can click function buttons below.

Edimax IC-3110P - NOTE: You must use 32-bit Internet Explorer! - 6

natural_image Row of five gray icons on black background: magnifying glass, minus sign, wrench, camera, and document icon (no text or symbols)

Enlarge / reduce image size

Edimax IC-3110P - NOTE: You must use 32-bit Internet Explorer! - 7

Click + or – button to enlarge or reduce image size, this is very useful when you want to see details of certain object in the image.

WELCOME

Configure network camera

Edimax IC-3110P - Configure network camera - 1

Click this button to display network camera configuration menu and you can chage the parameters of IP camera. Click 'Apply' to save changes or click 'Cancel' to discard changes.

Brightness Saturation Sharpness Video Quality Pan & Tilt Speed Video Resolution Language 640 X 480 English Apply Cancel

Pan-tilt control

Edimax IC-3110P - Pan-tilt control - 1

Click this button and a set of arrow will be shown on the image. Click the arrow to move network camera to the direction indicated by the arrow.

Click circle located in the center or arrow set to return network camera to 'Home' (original) position. If you no longer need to use pan-tilt function, click this button again

Edimax IC-3110P - Pan-tilt control - 2

natural_image Interior scene with stuffed animals and a 'Welcome' sign, no readable text or symbols in the main image area.

Snapshot

Edimax IC-3110P - Snapshot - 1

Click this button to take a snapshot of current image and save on your computer's hard drive.

You'll be prompted to select a folder on your computer.

Save... Save in: Desktop Recent Places Desktop Libraries System Folder albert System Folder Network System Folder IPCam Admin Utility Shortcut 1.07 KB Untitled PNG image 12.3 KB Homegroup System Folder Computer System Folder ExpressView Shortcut 1.68 KB IPCam Surveillance Software Shortcut 1.12 KB File name: Save as type: All Files (*.*)

Full-screen view

Edimax IC-3110P - Full-screen view - 1

Click this button to enlarge image view to full-screen size, all functino buttons will disappear to maximize display area. Click anywhere in the image to return to normal display mode.

welcome

Chapter V: Appendix

5.1 Specifications

Max Resolution: 1280 x 1024 pixels

Sensor: 1.3Mega pixels 1/4" color CMOS sensor

Gain control: Automatic

Exposure: Automatic

White Balance: Automatic

Image (Video Setting)

Image compression: MJPEG/MPEG4/H.264 Image Video

Digital 24-bit Color

Frame rate: 10-15fps@SXGA, XGA, 30fps@QVGA, 20fps@VGA

Video resolution: MJPG&H.264: 1280x1024, 640x480, 320x240

MPEG4: 1024x768, 640x480, 320x240

System Hardware

LAN Connector: One RJ-45 port to connect to 10/100Mbps Ethernet

Wireless: IEEE 802.11b/g/n (*Wireless Model Only)

LED Indicator: Power/Audio/LAN/WLAN for wired and wireless model

Power/Audio/ACT/LAN for POE model

HTTP/Utility

Includes easy-to-find and surveillance utility

Provides Web based Management

View multiple cameras simultaneously on PC surveillance software up to 16 cameras

at a time

Supports 16 additional user accounts for viewing camera

Auto sending Snap Shot or video by E-mail or FTP

Support NO-IP DNS and UPnP functions

Supports Windows 2000/XP/Vista/Win7

Firmware Upgradeable

EMI & Safety

FCC, CE class B

5.2 How to apply for a free DNS account at http://www.no-ip.com

It's very likely your IP address (the Internet location) keeps changing every a couple of hours or every day depending on your ISP's policy. Therefore, as shown in the following figure, you may be assigned with an IP address, "61.61.61.1" hours ago, and now with a new IP address, "72.72.72.1". This means the router at "My-home" can be found at http://61.61.61.1 over the Internet is no longer available after a few hours. To find out the new location (IP address) of the router at My home over the Internet, you need to login to the router, checking the new IP address. However, this is not a workable solution.

To overcome this problem, an Internet service called NO-IP DNS is designed to help you trace the log of the changing IP address linking with a web site address (URL). As shown in the following figure, one PC called DNS server keeps revising the record "your-name.no-ip.org vs 61.61.61.1" in its internal DNS directory. It ends up entering http://your-name.no-ip.org in the iPhone can find out the 2 network camera at My-home.

Edimax IC-3110P - How to apply for a free DNS account at http://www.no-ip.com - 1

flowchart
graph TD
    A["My home"] --> B["Bed Room"]
    A --> C["Book Room"]
    B --> D["1st IP-Camera"]
    C --> E["2nd IP-Camera"]
    D --> F["Router"]
    E --> F
    F --> G["Internet"]
    G --> H["DNS server"]
    H --> I["DNS directory"]
    I --> J["61.61.61.1 = your-name.no-ip.org"]
    I --> K["72.72.72.1 = your-name.no-ip.org"]
    L["change to 72.72.72.1"] --> M["2nd IP-Camera"]
    style A fill:#f9f,stroke:#333
    style B fill:#ccf,stroke:#333
    style C fill:#ccf,stroke:#333
    style D fill:#cfc,stroke:#333
    style E fill:#cfc,stroke:#333
    style F fill:#fcc,stroke:#333
    style G fill:#cff,stroke:#333
    style H fill:#ffc,stroke:#333
    style I fill:#ffc,stroke:#333
    style J fill:#ffc,stroke:#333
    style K fill:#ffc,stroke:#333

The following are steps to apply for an account named "your-name.no-ip.org" in the http://www.no-ip.com and how this account is configured into Edimax router.

Note: http://www.no-ip.com is not a branch or affiliate of Edimax. No commercial relation is involved between these 2 companies. The related service offered in the http://www.no-ip.com is for free for a specific time. However, Edimax does not guarantee this service.

First, go to http://www.no-ip.com and apply for an account.

And follow the steps:

no-ip The DNS Service Provider Home Download Services Support Company Managed DNS No-IP Plus, the complete managed DNS solution. Easy to use interface. Complete control over your domain. FREE dynamic DNS update client. Includes 50 hosts/sub domains. More info Buy Now User Login Username Password Create Account Forward password? Login Additional Services

Hosts/Redirects DNS Hosting Domain Registration Mail SSL Certificates Monitoring Dedicated Servers Renew/Active Need redundancy for your mail server? Click here for more info 24/7 Server Monitoring and Failover Click here for more info Need Help? • Support Center • Basic Troubleshooting Your No-IP , welcome to your No-IP! Last Login: 2009-01-09 23:36:06 from IP You have successfully logged into No-IP's member section. To start using No-IP's services select an icon below or choose an item from the navigation above. Manage Domains Add Domain Refer Friend Add a Host Manage Hosts

Hostname Information Hostname: no-ip.biz Host Type: DNS Host (A) DNS Host (Round Robin) DNS Alias (CNAME) Port 80 Redirect Web Redirect

Mail Options MX Record MX Priority Enter the name of your external mail exchangers (mx records) as hostnames not IP addresses. 5 If you would like a more MX records, please upgrade to No-IP Plus or Enhanced. Revert Create Host

Now, you could locate your home network camera using http://your-name.no-ip.org

5.3 Troubleshooting

If the network camera is not working properly, before you contact the dealer of purchase for help, please check the troubleshooting list here, this may help you to solve the problem by yourself and therefore saves your valuable time.

Scenario Possible Solution
I can not connect to network cameraa. Please confirm the IP address setting of the computer you're using. If they're not in the same subnet, they will not be able to communicate with each other.b. Please make the IP address you used to connect to the network camera is correct.c. If you forget the IP address of the network camera, you will have to reset it to factory default value (which is 192.168.2.3) by pressing ‘reset’ button at the bottom of the network camera. You'll need a pen or pin to be able to press the reset button. Press and hold reset button for 5 seconds, then try to connect to the network camera with IP address ‘192.168.2.3’ again.d. Please make sure network camera is correctly powered (the ‘Power’ LED should be on).e. If you're trying to connect to the network camera from Internet, please make sure the port that network camera uses (Video and HTTP port, see section 2.3.1) is not blocked by firewall or other software / hardware.f. Contact dealer of purchase for help, if above solutions do not work.
Image refreshes very slowa. Try a higher frame rate setting, if it's not 30.b. Try a lower resolution.c. If you're connecting this camera from Internet, it could be caused by a slow Internet connection, and it's not a problem caused by camera. However, when the network connection is slow, you should use lower frame rate / resolution.d. Adjust the antenna if you're using wireless connection. The antenna should be perpendicular to the ground to get best reception, and the distance between network camera and computer / wireless access point should not be too far.e. Try to adjust 'MTU' setting if you're using PPPoE to connect to Internet. Ask your ISP or network administrator for detailed instruction.
Network camera is not respondinga. Is the network cable or wireless connection disconnected? Please check it.b. Unplug the power adapter from wall socket and plug it in again after 10 seconds, then try to connect to the network camera again.c. If network camera is correctly powered ('Power' LED is on), but you still can not connect to the camera when you're sure that IP address is correct, please contact dealer of purchase for help).
Image is fuzzy a. Adjust the focus ring on the camera until the image becomes clear.b. Use a soft cloth to clean the lens on the camera. You can use cloth with water, but DO NOT use alcohol or other chemical solution.c. Try to adjust brightness setting.d. If there's any light at the place where network
camera is located, switch it on and see if image looks better.
I set the network camera to send image by Email or FTP, but nothing is receiveda. If the image is send by Email, please make sure it's not blocked by any anti-spam mechanism.b. Please make sure you have enough permission for FTP uploading (You can try this by clicking 'Upload a test file' button).c. Make sure the user name and / or password of SMTP server is correct, if your SMTP server requires authentication (You can try this by click 'Send a test Email' button).d. Please check log, if FTP upload or Email sending is failed, it will be logged, and this may give you some clue on how to solve the problem.e. Change the threshold to a more sensitive setting.
I heard strange sound when I use pan / tilt functiona. Please check if anything jams the camera, remove it.a. If the camera does not respond to you when you're trying to use pan / tilt function, the servo motor inside the camera may dead. Please return the camera to the dealer of purchase and ask for help.
Nothing is heard at the camera side when I use 'Speak to IPCam' functionAn external speaker is required to playback the voice received at computer side.

ΣDIMAX

NETWORKING PEOPLE TOGETHER

Edimax Technology Co., Ltd

6F., No.3, Wu-Chuan 3rd Road, Wu-Gu, New Taipei City, Taiwan

Edimax Technology Europe B.V.

Table of contents Click a title to access it
Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : Edimax

Model : IC-3110P

Category : Security Camera