Edimax IC-7000PTn - Security Camera

IC-7000PTn - Security Camera Edimax - Free user manual and instructions

Find the device manual for free IC-7000PTn Edimax in PDF.

📄 136 pages English EN Download 💬 AI Question ⚙️ Specs
Notice Edimax IC-7000PTn - page 6
Pick your language and provide your email: we'll send you a specifically translated version.
Product Type Indoor/Outdoor Pan/Tilt IP Security Camera
Power Supply 12V DC via included power adapter
Network Interface Fast Ethernet (10/100 Mbps) RJ-45, IEEE 802.11b/g/n Wi-Fi
Video Compression MJPEG, MPEG4, H.264
Max Resolution 1280 x 1024 (SXGA)
Frame Rate Up to 30 fps at QVGA, 20 fps at VGA, 10-15 fps at SXGA/XGA
Lens Fixed focus with manual focus ring
Pan & Tilt Pan: 270°, Tilt: 120° (software controlled)
Night Vision 9 IR LEDs, automatic or scheduled activation, range not specified
Motion Detection Yes, configurable sensitivity and region (up to 3 regions)
Audio Built-in microphone, external speaker output, two-way audio
Storage SD/SDHC card slot (max capacity not specified), also network storage via Samba
Wireless Security WEP, WPA, WPA2, WPS push-button and PIN
Protocols TCP/IP, DHCP, PPPoE, DDNS, UPnP, RTSP, SMTP, FTP
Web Interface Yes, via Internet Explorer with ActiveX plugin
Surveillance Software Included (16-channel viewer), supports up to 16 cameras simultaneously
Mobile Viewing Via iPhone (Safari) with dedicated URL
User Accounts 1 admin + up to 16 user accounts (viewer or operator)
LED Indicators Power, Audio, LAN, WLAN
Reset Reset button on bottom for factory defaults

Frequently Asked Questions - IC-7000PTn Edimax

How do I find the IP address of my IC-7000PTn camera?
What is the default username and password?
Can I use the camera wirelessly?
How do I set up motion detection?
Why is the image quality poor or fuzzy?
How can I view the camera from the internet?
What should I do if I forget the password?
Does the camera support audio?
How do I record video from the camera?
Can I connect multiple cameras to the surveillance software?

User questions about IC-7000PTn Edimax

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Security Camera in PDF format for free! Find your manual IC-7000PTn - Edimax and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. IC-7000PTn by Edimax.

USER MANUAL IC-7000PTn Edimax

Fast Ethernet / 300Mbps Wireless 802.11n / PoE Triple Mode Pan/Tilt IP Camera with Night Vision

IC-7010PT / IC-7010PTn / IC-7010PoE User Manual

Version 1.0 / June, 2010

Edimax IC-7000PTn - Fast Ethernet / 300Mbps Wireless 802.11n / PoE Triple Mode Pan/Tilt IP Camera with Night Vision - 1

natural_image Exterior view of a modern office building (no signage)

Edimax IC-7000PTn - Fast Ethernet / 300Mbps Wireless 802.11n / PoE Triple Mode Pan/Tilt IP Camera with Night Vision - 2

natural_image Exterior view of a silver remote control device (no text or symbols visible)

Edimax IC-7000PTn - Fast Ethernet / 300Mbps Wireless 802.11n / PoE Triple Mode Pan/Tilt IP Camera with Night Vision - 3

natural_image Exterior view of a silver TP587 dual-camera security camera with visible ports and control buttons (no text or symbols)

ErP Announcement

Product: Internet Camera (IP Camera)

Purpose: 24 hour surveillance and transfer of footage for safety and health reasons as intended use.

Detailed description:

  • Health purposes: Users can pass through the Internet (from anywhere) to control the product (IP Camera). It's intended to watch and listen to people who need to be cared for at home and automatically sends e-mails and phone alerts to warn observers and ask for their attention. The product also provides a record function to retain all images and voice information for the sake of reference.
  • Safety purposes: Users can initiate a “motion detect” function to record and send e-mails to notify them when doors or windows are opened – potentially by unwarranted persons.
  • General purposes: Record/monitor environment footage and sound and store them onto a hard disk as a record.

As we cannot predict when events of this nature may occur, we need for the product to remain active and alert at all times. If the product had to go into “standby/off” mode, it would impact the effectiveness of recording and warning functions resulting in users not getting the information they need.

Based on the ErP official journal of European Union

Directives 2009/125/CE of the European parliament and of the council of 21 October 2009 Article 15 sector 5 part (a) and (b) as below:

“Implementing measures shall have no significant negative impact on the functionality of the product, from the perspective of the user.”

"Health, safety and environment shall not be adversely affected."

We announce that the product need not comply with the (EC) No 1275 Standby and on/off mode function of Implementing Measurement.

We will keep up to the newest Implementing Measurements in the future and make the necessary changes if it's related to this product.

ΣDIMAX NETWORKING PEOPLE TOGETHER

Copyright© by Edimax Technology Co, LTD. all rights reserved. No part of this publication may be reproduced, transmitted, transcribed, stored in a retrieval system, or translated into any language or computer language, in any form or by any means, electronic, mechanical, magnetic, optical, chemical, manual or otherwise, without the prior written permission of this company.

This company makes no representations or warranties, either expressed or implied, with respect to the contents hereof and specifically disclaims any warranties, merchantability or fitness for any particular purpose. Any software described in this manual is sold or licensed "as is". Should the programs prove defective following their purchase, the buyer (and not this company, its distributor, or its dealer) assumes the entire cost of all necessary servicing, repair, and any incidental or consequential damages resulting from any defect in the software. Further, this company reserves the right to revise this publication and to make changes from time to time in the contents hereof without obligation to notify any person of such revision or changes.

The product you have purchased and the setup screen may appear slightly different from those shown in this QIG. For more detailed information about this product, please refer to the User Manual on the CD-ROM. The software and specifications are subject to change without notice. Please visit our web site www.edimax.com for the update. All rights reserved including all brand and product names mentioned in this manual are trademarks and/or registered trademarks of their respective holders.

Notice according to GNU/GPL-Version 2

This product includes software that is subject to the GNU/GPL-Version 2. You find the text of the license on the product cd/dvd. The program is free software and distributed without any warranty of the author. We offer, valid for at least three years, to give you, for a charge no more than the costs of physically performing source distribution, a complete machine-readable copy of the corresponding source code.

Please contact Edimax at: Edimax Technology co., Ltd, NO. 3, Wu-Chuan 3rd RD Wu-Ku-Industrial Park, Taipei Hsien, Taiwan. R.O.C., TEL : +886-2-77396888, FAX : +886-2-77396887, sales@edimax.com.tw

Table of Contents

Chapter I: Familiar with your Internet IP Camera 6

1.1 Package Contents ......6

1.2 Basic Introduction ...... 7

1.3 Product Highlights....8

1.4 Familiar with Key Components ......9

IC-7010PT: 11

IC-7010PTn: 12

IC-7010PoE:....13

1.5 Camera Installation....17

1.6 Locate the IP Address of this IP Camera 20

1.7 Using Camera Admin Software to Locate Camera 24

Chapter II: Using Web Management Interface 36

2.1 Camera Settings....36

2.2 Video....40

2.2.1 MJPEG 41

2.2.2 MPEG4 42

2.2.3 H.264 43

2.2.4 OSD 44

2.2.5 Night Vision....45

2.3 Pan and Tilt....46

2.3.1 Preset Points 46

2.3.2 Guard Tour....48

2.4 Network Settings....51

2.4.1 LAN....52

2.4.2 WLAN 55

2.4.3 Dynamic DNS 58

2.4.4 UPnP 59

2.4.5 LoginFree 61

2.4.6 RTSP 62

2.5 Motion Detection....63

2.5.1 Motion Detection....64

2.5.2 Motion Region 66

2.6 System Info....73

2.6.1 Camera Information....74

2.6.2 Date / Time Setting 75

2.6.3 Schedule....77

2.6.4 Utilities....79
2.6.5 Status....81

2.6.6 System Log....82

2.7 Account....83

2.7.1 Status....86
2.7.2 Space Alarm 87
2.7.3 File Management....89

Chapter III: Using Surveillance Software....90

3-1 Installing IP Camera Surveillance Software 90
3-2 Using IP camera surveillance software....94
3-3 Configure IP camera surveillance software 97

3-3-1 Configure cameras....97
3-3-2 General Settings 106

3-4 Change Display Layout 112

3-5 Full-screen mode....115
3-6 Scan 116
3-7 Zoom-in / Zoom-out....117
3-8 PTZ....118
3-9 Snapshot 119
3-10 Recording 120
3-11 Video Playback....121

Chapter IV: How to View IP Camera over the Internet with iPhone......122

Chapter V: Appendix 129

5.1 Specification....129
5.2 How to apply for a free DNS account in the http://www.dyndns.org 130
5.3 Troubleshooting....133

Chapter I: Familiar with your Internet IP Camera

1.1 Package Contents

Thank you for purchasing this IP camera! Before you start to use this IP camera, please check the package contents. If anything is missing, please contact the dealer of purchase and return the package to claim for missing contents.

Item NameQuantity
1IP Camera1
2Antenna(IC-7010PTn only)2
3Power Adapter1
4Ethernet Cable1
5CD ROM (Including Manual/Utility/Multi-Language QIG)1
6Accessory kit1
7Quick Installation Guide1
8Mounting Kit1

1.2 Basic Introduction

Thank you for purchasing this IP camera! This IP camera is an ideal product for all kinds of video surveillance purposes, like home/office safety, kid/pet monitoring, and remote video acquire etc. Edimax IC-7010 series is tailor made to stream live video over your network. You can view the IP camera's video from anywhere on your local computers or via the Internet. Besides, Edimax IC-7010 series features high quality and high frame rate video streaming through advanced video compression. In order to achieve the highest video quality, simply select H.264, MPEG4 or M-JPEG depending on your network settings.

Some people may concern that there will be some places which will not be covered by camera, but this problem is completely solved by this IP camera. With built-in pan-tilt function, you can point the camera to the position where you wish to look at with user interface. You can even define a preset path, and the camera will cruise along the path you defined.

If the environment is too dark, it's also not a problem. This camera equips 9 IR-LEDs and will illuminate automatically when the environment is too dark, and the image captured by this camera will still be clear.

You can discover more useful functions in next section!

1.3 Product Highlights

No pre-loaded software required - all you need is a browser like Internet Explorer 6 (and above, with plugin installed).
With supplied video surveillance software, you can connect up to 16 video cameras and view images captured by every camera at the same time.
Supports 3 video resolutions: MJPG and H.264 SXGA(1280 x 1024), VGA (640 x 480), and QVGA (320 x 240); MPEG4 XGA (1024 x 768), VGA (640 x 480), and QVGA (320 x 240).
Anti-flicker function (eliminates flash caused by fluorescent lights, 50 / 60Hz selectable).
Video control functions, like brightness and zoom-in / zoom-out.
Audio function, suitable for applications like video conference or environment monitor.
Pan-tilt control.
9 automatically-controlled IR LEDs.
Wired and wireless network (IC-7010PTn only, 802.11b / 802.11g / 802.11n) support
Wireless data encryption (WEP / WPA)
Supports DHCP and PPPoE protocol, you can also assign a fixed IP address to the camera also.
Supports Dynamic DNS (used to allocate the IP camera's Internet address, when the ISP you're using does not assign you with a fixed Internet address).
Supports UPnP, Windows XP (and above) will discover this IP camera in network neighbor automatically.
Send captured picture and video by Email or FTP when motion is detected.
Configurable motion detection sensitivity (6 levels from most sensitive to least sensitive).
Built-in real-time clock, date and time information will be recorded with every captured picture / video clip (also supports auto time synchronization via network time protocol).
Upgradeable firmware - enjoy new functions without buying a new camera!
Supports up to 16 users, and you can set different password to different user.
Usage and event logging.

1.4 Familiar with Key Components

Front View

Focus Ring IR LED Microphone EDiMAX

Wired & Wireless:

Power LED

Audio LED

LAN LED

WLAN LED

POE model:

Power LED

Audio LED

ACT LED

LAN LED

ItemDescription
PowerEdimax IC-7000PTn - Familiar with Key Components - 2When the camera is powered on and ready for access, this LED will light up.
Audio((●))Indicates Audio status
Edimax IC-7000PTn - Familiar with Key Components - 3When the IP Camera is linked to a wired network, this LED will light up. The LED will flash while video is transmitted or received through a wired network.
ACTEdimax IC-7000PTn - Familiar with Key Components - 4(IC-7010)The LED will flash while data is transmitted.
PoE only)
Wireless(IC-7010 PT & IC-7010 PTn only)When the IP Camera is linked to a wireless network, this LED will light up. The LED will flash while video is transmitted or received through a wireless network.
Focus RingYou can change the aim and focus of the camera by adjusting the camera head's aim and adjusting the focus ring. Simply point it in your direction of choice and rotate the focus ring to your preference.
IR LEDsLights up when environment is too dark
Microph oneCollects audio

Back View

IC-7010PT:
USB Port Power Connector 12VDC USB Audio Out LAN SD Card Slot Audio Connector Ethernet Port

IC-7010PTn:

Antenna Base 12VDC WPS Audio Out SD LAN Ethernet Port Power Connector WPS Button SD Card Slot Audio Connector

IC-7010PoE:

Power Connector 12VDC SD Audio Out: LAN Ethernet Port SD Card Slot Audio Connector

ItemDescription
Power ConnectorConnects to 12V DC power adapter
SD Card SlotAccepts SD / SD-HC memory card for image / video storage
USB Port* (IC-7010PT only)Accepts USB WiFi adapter** to enable wireless
Audio ConnectorConnects to external speaker for audio output
Ethernet ConnectorConnect to your local area network
Antenna Base (IC-7010PTnonly)Connects to supplied antenna
WPS Button (IC-7010PTn only)Press the WPS button (click) on the IP Cam and click on the Access Point that you want to wirelessly connect it to.

Note: The USB port only works with Edimax USB WiFi adapters.

ItemDescription
Reset ButtonPress the button with pen nib and hold for 5 seconds to reset the camera settings to factory default value.

Bottom View

Edimax IC-7000PTn - Familiar with Key Components - 8

natural_image Technical diagram of a mechanical component with red arrows indicating direction, no text or symbols present

Tripod Connector

ItemDescription
Tripod ConnectorConnects to tripod to secure the camera when the camera is not put on a horizontal surface.

1.5 Camera Installation

Please follow the following instructions to set your IP camera up.

  1. Unpack the product package and check if anything's missing.

  2. Connect the Ethernet cable to your local area network, and connect the other end to the LAN jack of this IP camera.

Edimax IC-7000PTn - Camera Installation - 1

natural_image Line drawing of a hand inserting a USB into a device (no text or symbols)
  1. Plug the power adapter to wall socket, and connect the power connector to the power jack located at the bottom of the IP camera.

Edimax IC-7000PTn - Camera Installation - 2

natural_image Line drawing of a hand inserting a USB into a device (no text or symbols)
  1. Connect two antennas to the antenna bases, which is located at the back of this IP camera.

Edimax IC-7000PTn - Camera Installation - 3

natural_image Line drawing of a hand holding a connector to a device with ports and connectors (no text or symbols)
  1. Place the camera at a secure place, and point the camera to the place you wish to monitor. If you wish to hang the camera on the ceiling or wall, please use the tripod connector (located at the bottom of the camera) to secure the camera.

Edimax IC-7000PTn - Camera Installation - 4

natural_image Technical line drawing of a mechanical component with mounting holes and central square feature (no text or symbols)
  1. Launch Internet Explorer on your computer, and following the instructions given in next section to set the IP camera.

1.6 Locate the IP Address of this IP Camera

Default IP address of this IP camera is 192.168.2.3. If you wish to assign another IP address to this IP camera, you have to log onto the web configuration interface of the camera first.

If the left three fields of the IP address of your computer is not 192.168.2, you'll have to change the IP address of your computer first:

1. Click 'Start' -> 'Control Panel'

home user Internet Internet Explorer E-mail Outlook Express Command Prompt Windows Media Player Ralink Wireless Utility iTunes Yahoo! Music Jukebox MSN All Programs My Documents My Recent Documents My Pictures My Music My Computer Control Panel Set Program Access and Defaults Printers and Faxes Help and Support Search Run... Log Off Turn Off Computer start IP Camera - Microsoft...

2. Double-click 'Network Connections' icon.

Control Panel File Edit View Favorites Tools Help Back Search Folders Address Control Panel Go Control Panel Switch to Category View See Also Windows Update Help and Support Accessibility Options Add Hardware Add or Remov... Administrative Tools Automatic Updates Date and Time Display Folder Options Fonts Game Controllers Internet Options Keyboard Mouse Network Setup Wizard Phone and Modem ... Power Options Printers and Faxes QuickTime Regional and Language ...

3. Right-click 'Local Area Connection', and click 'Properties'.

Network Connections File Edit View Favorites Tools Advanced Help Back Search Folders Address Network Connections Network Tasks LAN or High-Speed Internet Create a new connection Set up a home or small office network Change Windows Firewall settings Disable this network device Repair this connection Rename this connection View status of this connection Change settings of this connection Local Area Connection Connected, Firewalled AMD PCNET Family PCI Ethernet... Disable Status Repair Bridge Connections Create Shortcut Delete Rename Properties

  1. Select 'Internet Protocol (TCP/IP)', then click 'Properties'.

Local Area Connection Properties General Advanced Connect using: AMD PCNET Family PCI Ethernet Ad Configure... This connection uses the following items: QoS Packet Scheduler AEGIS Protocol (IEEE 802.1x) v3.5.3.0 Internet Protocol (TCP/IP) Install... Uninstall Properties Description Transmission Control Protocol/Internet Protocol. The default wide area network protocol that provides communication across diverse interconnected networks. Show icon in notification area when connected Notify me when this connection has limited or no connectivity OK Cancel

  1. In 'IP address' field, please fill in any IP address begins with '192.168.2', and ends with a value greater than 2 and less than 254 (You can use the example in the picture '192.168.2.339'). In Subnet mask field, please fill '255.255.255.0'. Please keep all other fields empty, and click 'OK'.

Internet Protocol (TCP/IP) Properties General You can get IP settings assigned automatically if your network supports this capability. Otherwise, you need to ask your network administrator for the appropriate IP settings. Obtain an IP address automatically Use the following IP address: IP address: 192 . 168 . 2 . 239 Subnet mask: 255 . 255 . 255 . 0 Default gateway: Obtain DNS server address automatically Use the following DNS server addresses: Preferred DNS server: . Alternate DNS server: . Advanced... OK Cancel

If you changed the IP address of this IP camera and you forget it, there're 2 methods to recover it:

a. Press and hold the 'Reset' button located at the bottom of this IP camera, to clear all settings of the IP camera and reset the IP address back to 192.168.2.3. You'll lose all settings in the IP camera.
b. Ask network administrator to check the DHCP release table, if the camera was set to obtain the IP address by DHCP, a new record will be added to DHCP release table on DHCP server when the IP camera is connected to the local area network.

1.7 Using Camera Admin Software to Locate Camera

If you can't connect to the camera by the instructions given in last chapter, you can use camera admin software to search the camera which is connected to your local area network. The admin software is also capable to locate multiple cameras on your local area network.

Please insert the user manual CD-ROM supplied in the product package, and the CD will automatically running the installation, if not please double-click 'Setup_Admin_3.0.17' icon:

New 16 Chan File Edit View Favorites Tools Help Back Search Folders Address C:\Temp\New 16 Chan Go File and Folder Tasks Rename this file Move this file Copy this file Publish this file to the Web E-mail this file Delete this file Other Places Temp My Documents Shared Documents My Computer My Network Places Details Release Note_Admin Text Document 1 KB Setup_Admin_3.0.1 IPCam Admin Utility Setup Edimax Technology Co., Ltd. Release Note_Viewer Text Document 1 KB Setup_Viewer_3.0.0.6 IPCam Surveillance Software ... Edimax Technology Co., Ltd.

Then follow the following instructions to install and use camera admin software:

  1. Click 'Next' to start install camera admin software:

Setup - IPCam Admin Utility Welcome to the IPCam Admin Utility Setup Wizard This will install IPCam Admin 3.0 on your computer. It is recommended that you close all other applications before continuing. Click Next to continue, or Cancel to exit Setup. Next > Cancel

  1. You can change the installation folder of camera setup software here, click 'Browse' to select an existing folder, or you can just click 'Next' to use default installation folder:

Setup - IPCam Admin Utility Select Destination Location Where should IPCam Admin Utility be installed? Setup will install IPCam Admin Utility into the following folder. To continue, click Next. If you would like to select a different folder, click Browse. C:\Program Files\Internet Camera\Admin Browse... At least 2.3 MB of free disk space is required. < Back Next > Cancel

  1. If you wish to create desktop icon and / or quick launch icon for camera admin software, please check corresponding box, and click 'Next' to continue.

Setup - IPCam Admin Utility Select Additional Tasks Which additional tasks should be performed? Select the additional tasks you would like Setup to perform while installing IPCam Admin Utility, then click Next. Additional icons: ✓ Create a desktop icon ✓ Create a Quick Launch icon < Back Next > Cancel

  1. You'll see a brief of all options you selected, click 'Install' to install camera admin software now, or click 'back' to back to previous steps to change settings.

Setup - IPCam Admin Utility Ready to Install Setup is now ready to begin installing IPCam Admin Utility on your computer. Click Install to continue with the installation, or click Back if you want to review or change any settings. Destination location: C:\Program Files\Internet Camera\Admin Additional tasks: Additional icons: Create a desktop icon Create a Quick Launch icon < Back Install Cancel

  1. When you see this message, the installation of camera admin software is complete. If you wish to launch camera admin software now, keep 'Launch IP Cam Admin Utility' box checked, and click 'Finish' to close installation utility.

Setup - IPCam Admin Utility Completing the IPCam Admin Utility Setup Wizard Setup has finished installing IPCam Admin Utility on your computer. The application may be launched by selecting the installed icons. Click Finish to exit Setup. Launch IPCam Admin Utility Finish

After the camera admin software is launched, all cameras found on your local area network will be displayed:

Admin v3.0.1 Internet Camera Admin Software Language MAC Address IP Address Camera Name Model 00:11:09:30:10.c4 192.168.98.215 IC-5010PTn IC5010PTN

All camera-related information will be displayed here. If you wish to connect to certain camera by web browser, double-click the camera listed here.

The camera admin software also provides several functions:

Language change: This camera admin software supports 3 languages: English, Chinese, and Japanese. You can select the language you wish to use from language dropdown menu located at upper-right corner of camera admin software.

Admin v3.0.1 Internet Camera Admin Software Language MAC Address IP Address Camera Name Model 00:11:09:30:10.c4 192.168.98.215 IC-5010PTn IC5010PTN

Edimax IC-7000PTn - Using Camera Admin Software to Locate Camera - 9

Search camera: Click this button to search all cameras on local area network again.

Edimax IC-7000PTn - Using Camera Admin Software to Locate Camera - 10

Browse camera via web: Select a camera listed above first, and then click this button to connect to the camera by web browser.

Edimax IC-7000PTn - Using Camera Admin Software to Locate Camera - 11

Configure camera: Click this button to configure camera's network and security setting. You'll be prompted to input camera's password:

Login User Name admin Password OK Cancel

Input the password (default: 1234) and click OK to configure the camera's network and security setting:

Admin v3.0.1 Internet Camera Admin Software Lan Setting | Security | English DHCP Manual IP IP 192 . 168 . 98 . 215 Netmask 255 . 255 . 255 . 0 Gateway 192 . 168 . 98 . 254 DNS 192 . 168 . 98 . 254 Web Port 80 OK Cancel

In ‘Lan Setting’ page, you can configure camera’s network settings. Select ‘DHCP’ to set the camera to obtain an IP address from DHCP server on local area network automatically, and select ‘Manual IP’ to input the IP address information manually. Click ‘OK’ to save settings.

In ‘Security’ page, you can change the camera’s name and password (user name is always ‘admin’ and cannot be changed). You have to input the same password in both ‘New Password’ and ‘Confirm Password’ field, or you’ll be prompted to input new password again. Click ‘OK’ to save settings or click ‘Cancel’ to discard changes.

Admin v3.0.1 Internet Camera Admin Software English Lan Setting Security Camera Name IC-5010PTn New Password Confirm Password OK Cancel

1.8 Log Onto Web Management Interface

Make sure the IP camera is correctly powered (Power LED is on), and then launch Internet Explorer and type the IP address of the IP camera in address bar of Internet Explorer. You should be prompted to input the user name and password:

Connect to 192.168.2.2 Internet Camera User name: Password: Remember my password OK Cancel

Default user name is 'admin' and password is '1234'. Click 'OK' to continue after user name and password has entered.

If you're rejected, maybe the password has been modified previously. This should not happen if this is a newly-purchased camera, however, if you get the camera from someone else, the password would be changed. Please try to obtain the correct user name / password, or you'll have to reset the camera.

If this is the first time you log onto web management interface, you'll be prompted to install ActiveX Plugin:

Microsoft Internet Explorer ActiveX plugin is NOT installed yet, please install activeX first. OK

When you see this message, please click 'OK', and click 'Download the latest ActiveX' link to download plugin so you can use this camera:

IE ActiveX plugin is NOT installed yet. Please download the latest ActiveX and close IE browser before you reinstall it. Download the latest ActiveX Snapshot C:\Recording C:\Speak to IPCath Digital Zoom Fit to Window Size Full Screen

Click 'Run' to download plugin:

File Download - Security Warning Do you want to run or save this file? Name: Setup_v1.0.0.3.exe Type: Application, 747 KB From: 192.168.3.3 Run Save Cancel While files from the Internet can be useful, this file type can potentially harm your computer. If you do not trust the source, do not run or save this software. What's the risk?

Click 'Run' to install plugin:

Internet Explorer - Security Warning The publisher could not be verified. Are you sure you want to run this software? Name: Setup_v1.0.0.3.exe Publisher: Unknown Publisher Run Don't Run This file does not have a valid digital signature that verifies its publisher. You should only run software from publishers you trust. How can I decide what software to run?

Please click 'Next' button to start installation (click 'Next' or 'Install' when you're prompted, until installation is complete).

Setup - GLP IPCamPluginTMPT Welcome to the GLP IPCCamPluginTMPT Setup Wizard This will install Internet Camera ActiveX 1.0.0.3 on your computer. It is recommended that you close all other applications before continuing. Click Next to continue, or Cancel to exit Setup. Next > Cancel

Click 'Finish' to complete plugin installation.

Setup - GLP IPCamPluginTMPT Completing the GLP IPCAMPluginTMPT Setup Wizard Setup has finished installing GLP IPCamPluginTMPT on your computer. The application may be launched by selecting the installed icons. Click Finish to exit Setup. Finish

Now you can go back to web browser, and you should be able to see the image captured by camera (You may need to press F5 or CTRL-R to reload web page).

File Edit View Favorites Tools Help Search Favorites Address http://192.168.3.3/index.asp EDIMAX NETWORKING PEOPLE TOGETHER H 1 2 3 4 5 6 7 8 9 C Pan/IE Speed: 2 Video Type: H.264 Frequency: 60 Hz Flip Mode: Normal Brightness: - Volume: + Apply Camera - Video - Pan & Tilt - Network - Motion Detection - System - Account - SDHC JAL

Note: If you see one of these messages (or both):

Display hardware is not capable of blit operations OK

OR

Error Can't initialize DirectX. OK

Your computer may not have the display capability that this IP camera requires, or you don't have Microsoft DirectX® installed. Please download Microsoft DirectX® from Microsoft's website (http://www.microsoft.com), and try again.

In some cases, your computer is able to display the image from IP camera correctly, but you'll still see these messages. If this happens, just ignore them.

Chapter II: Using Web Management Interface

2.1 Camera Settings

The first menu after you logged onto web management interface is 'Camera', and this is the only menu you can see the real-time image from camera.

File Edit View Favorites Tools Help Search Favorites Address http://192.168.3.3/index.asp SDIMAX NETWORKING PEOPLE TOGETHER Camera - Video - Pan & Tilt - Network - Motion Detection - System - Account - SDHC Pan/Till Speed: 2 Video Type: H.264 Frequency: 00 Hz Flip Mode: Normal Droughtress - + Volume - + Apply JAL

You can always back to this menu by clicking 'Camera' on the top of web management interface.

Camera Video Pan & Tilt Network Motion Detection System Account SDHC

The descriptions of every setting in this menu will be given below:

ItemDescription
Pan/Tilt SpeedSpecifies the moving speed when you use pan / tilt function to point the camera to a new direction. Available options are 1 (fastest) to 5 (slowest). Select 1 to move the camera by a faster speed, but you will not be able to control the movement precisely. If you want to move the camera in a more accurate manner, select a slower speed.
Video TypeSpecifies video encoding type. Available options are ‘MPEG4’, ‘MJPEG’, and ‘H.264’. Different encoding type requires different bandwidth, and provides different video quality.
FrequencyIf the place where this IP camera points to has a (or more) fluorescent light(s), the image may look flashing. In this case, you can adjust this setting to the frequency of electrical power; this can improve the image quality effectively. If you don’t know which one you should use, just try any of them and select one with less flicker.
Flip ModeIf you’re not putting this camera on a horizontal surface but hang the camera on the ceiling or wall, you can use this function to rotate the displaying image.
Brightness / Saturation / SharpnessSelect brightness, saturation, and sharpness from dropdown menu, and click ‘-’ or ‘+’ button to increase or decrease brightness / saturation / sharpness setting value. In certain environment, adjust brightness, saturation, and / or sharpness will help improve video quality.
VolumeAdjust the volume of audio output. Press ‘+’ or ‘-’ button to increase or decrease volume.
NOTE: When you change any setting(s) listed above, please click ‘Apply’ button so the change(s) will take effect. For following functions, changes will take effect right away.
Pan / Tilt ControlEdimax IC-7000PTn - Camera Settings - 3Moves camera to a new direction. Press one of 8 directional buttons to move the camera, and press ‘H’ to move the camera back to ‘home’ (original) position.
Preset PointsEdimax IC-7000PTn - Camera Settings - 4You can set up to 9 preset points of camera position; press the number to move the camera to preset point instantly. See next chapter for detail instructions of how to set preset points.Press ‘C’ and the camera will cruise between all preset points automatically.
SnapshotEdimax IC-7000PTn - Camera Settings - 5 SnapshotClick ‘Snapshot’ button to save the displaying image as an image file, a message box will appear after you click ‘Snapshot’ button, showing the filename and location of saved image file (default filename is current date and time).Default directory used to save image file is ‘C:\’, you can change the directory by clicking the text input box located at the right of ‘Snapshot’ button:Edimax IC-7000PTn - Camera Settings - 6and you’ll be prompted to select a new directory.
RecordingEdimax IC-7000PTn - Camera Settings - 7 RecordingPress this button to record the displaying image as a video file in AVI format, and you can play the video file back by Windows Media Player. To stop recording, press ‘Stop Recording’ button (the same button). You can also change the directory used to save video file.
Speak to IP CamEdimax IC-7000PTn - Camera Settings - 8 Speak to IPCamYou can transmit the voice received by your computer’s microphone to the camera’s external speaker. Press and hold this button, then speak to the microphone. Please note that external speaker must be connected to this camera.
Digital ZoomIf you wish to enlarge certain portion of the captured
Edimax IC-7000PTn - Camera Settings - 9Digital Zoomimage, you can click this button to set digital zoom:Edimax IC-7000PTn - Camera Settings - 10Click ‘Enable’ to enable digital zoom function, then you can drag the slide bar to adjust zoom ratio. You can also use your mouse to drag the zoom area (the green square) to reposition the zoom area.
Fit to Window SizeEdimax IC-7000PTn - Camera Settings - 11Fit to Window SizeClick this button and the image size will be adjusted to fit the size of browser window.
Full ScreenEdimax IC-7000PTn - Camera Settings - 12Full ScreenClick this button to display the image in full-screen mode (uses all available space to display the image captured by this camera).

2.2 Video

You can change video-related settings of this IP camera in 'Video' menu. You can access this menu by clicking 'Video' on the top of web management interface.

Camera Video Pan & Tilt Network Motion Detection System Account SDHC

There are 5 types of video settings for this IP camera. To set the option of a certain video setting, put mouse cursor on it and its options will appear.

Video

MJPEG MPEG4 H.264 OSD Night Vision MJPEG ✓ Video Resolution : 640 x 480 ✓ Video Quality : Highest ✓ Frame Rate : 30 Apply

2.2.1 MJPEG

You can adjust video settings when you select 'MJPEG' as video type in 'Camera' menu.

MJPEG

Video Resolution : 640 x 480 Video Quality : Highest Frame Rate : 30 Apply

The descriptions of every setting in this menu will be given below:

ItemDescription
Video ResolutionChanges the resolution of video. Available options are 1280 x 1024, 640 x 480, and 320 x 240. Higher resolution provides better video quality and more detail, but requires more network bandwidth.
Video QualityChanges video quality. There are 5 levels of video quality from ‘Lowest’ to ‘Highest’. Selecting a higher video quality will provide better video quality, but requires more network bandwidth.
Frame RateChanges video frame rate. Available options from ‘30’ to ‘1’, indicates how many video frames this camera will transmit every second. Higher frame rate provides smooth video watching experience and will not lose details of video, but requires more network bandwidth. If you’re using this video camera with insufficient network bandwidth, selecting a lower frame rate setting will help.

Click 'Apply' for settings to take effect.

2.2.2 MPEG4

You can adjust video settings when you select 'MPEG4' as video type in 'Camera' menu.

MPEG4

Video Resolution :
Video Quality :
√ Frame Rate :

Edimax IC-7000PTn - MPEG4 - 1

The descriptions of every setting in this menu will be given below:

ItemDescription
Video ResolutionChanges the resolution of video. Available options are 1024 x 768, 640 x 480, and 320 x 240. Higher resolution provides better video quality and more detail, but requires more network bandwidth.
Video QualityChanges video quality. There are 5 levels of video quality from ‘Lowest’ to ‘Highest’. Selecting a higher video quality will provide better video quality, but requires more network bandwidth.
Frame RateChanges video frame rate. Available options from ‘30’ to ‘1’, indicates how many video frames this camera will transmit every second. Higher frame rate provides smooth video watching experience and will not lose details of video, but requires more network bandwidth. If you’re using this video camera with insufficient network bandwidth, selecting a lower frame rate setting will help.

Click 'Apply' for settings to take effect.

2.2.3 H.264

You can adjust video settings when you select 'H.264' as video type in 'Camera' menu.

H.264

Video Resolution :
Video Quality:
√ Frame Rate :

Edimax IC-7000PTn - H.264 - 1

The descriptions of every setting in this menu will be given below:

ItemDescription
Video ResolutionChanges the resolution of video. Available options are 1280 x 1024, 640 x 480, and 320 x 240. Higher resolution provides better video quality and more detail, but requires more network bandwidth.
Video QualityChanges video quality. There are 5 levels of video quality from ‘Lowest’ to ‘Highest’. Selecting a higher video quality will provide better video quality, but requires more network bandwidth.
Frame RateChanges video frame rate. Available options from ‘30’ to ‘1’, indicates how many video frames this camera will transmit every second. Higher frame rate provides smooth video watching experience and will not lose details of video, but requires more network bandwidth. If you’re using this video camera with insufficient network bandwidth, selecting a lower frame rate setting will help.

Click 'Apply' for settings to take effect.

2.2.4 OSD

If you need to display information about this camera, like camera's name or current date / time, you can use OSD (On-Screen Display) menu:

On-Screen Display

√ On-Screen Display :
○ Enable ● Disable
Show Camera Name :
○ Enable ● Disable
Show Date :
- Enable ○ Disable
Show Time :
- Enable ○ Disable
Apply

The descriptions of every setting in this menu will be given below:

ItemDescription
On-Screen DisplaySelect ‘Enable’ to enable on-screen display function (information about this camera will be displayed on camera’s display image), and select ‘Disable’ to disable it.
Show Camera NameSelect ‘Enable’ to show camera’s name on camera’s display image, select ‘Disable’ to hide it.
Show DateSelect ‘Enable’ to show current date on camera’s display image, select ‘Disable’ to hide it.
Show TimeSelect ‘Enable’ to show current time on camera’s display image, select ‘Disable’ to hide it.

Click 'Apply' for settings to take effect.

When OSD is enabled, selected OSD items will be displayed like this:

2009 .01 .01 17 : 00 : 36 IC -A31 201

2.2.5 Night Vision

This camera equips with 9 IR LEDs to enhance video quality in the night. You can enable or disable IR LEDs by 'Night Vision' menu:

IR Control

Always turn off IR led
○ Always turn on IR led
Auto mode
Turn on/off IR led by schedule
Turn on IR led from :
√ Turn off IR led from :

0 : 0 24-hour (hh : mm) 0 : 0 24-hour (hh : mm)

Apply

The descriptions of every setting in this menu will be given below:

ItemDescription
Always turn off IR ledDo not use IR LEDs, even it's very dark.
Always turn on IR ledTurn IR LEDs on, even it's very bright.
Auto modeLet camera decide to switch LED lights on or off automatically: LEDs will light up when it's too dark. If you don't know which option you should select in this page, select this one.
Turn on/off IR led by scheduleSwitch IR LEDs on or off by schedule. You have to input start time in ‘Turn on IR led from’ section, and end time in ‘Turn off IR led from’ section.

Click 'Apply' for settings to take effect.

2.3 Pan and Tilt

This IP camera supports pan and tilt function, as you explored in last section. You can also make the camera move automatically in pan and tilt menu by defining a set of pre-defined path.

You can access this menu by clicking 'PTZ' on the top of web management interface.

Edimax IC-7000PTn - Pan and Tilt - 1

flowchart
graph LR
    A["Camera"] --> B["Video"]
    B --> C["Pan & Tilt"]
    C --> D["Network"]
    D --> E["Motion Detection"]
    E --> F["System"]
    F --> G["Account"]
    G --> H["SDHC"]

2.3.1 Preset Points

You can define the camera position and save the position so you can recall the position later again. This camera provides 9 memory slots; follow the following instructions to move the camera and set a new preset point:

Pan & Tilt Preset Points Guard Tour 1970.01.01 17:57:05 UPPER LEFT UP UPPER RIGHT LEFT RIGHT LOWER LEFT DOWN LOWER RIGHT Position Name: Set to Point 1 Available Positions: Point-1 Point 1 Remove Point 1

  1. Select a memory slot from 'Available Positions' dropdown menu first.
  2. To move the camera, click the position of labeled text (not shown on image) on the image to move the camera to the direction. You may need to set the Pan / Tilt speed to a slower setting, so you can move the camera in a more accurate manner.

  3. When you move the camera to the position you want, type a name in 'Position name' field, and click 'Set to Point n' (where 'n' is the number of memory slot) button to save the position to selected memory slot.

After you set the position, you can recall the position from 'Camera' menu (click the position number button), and the camera will move to preset position instantly.

If you want to remove a preset position, select the memory slot from 'Available Positions' dropdown menu, and then click 'Remove Point n', (where 'n' is the number of memory slot you wish to clear position setting).

2.3.2 Guard Tour

You can make the camera move between many pre-defined positions, and define the time you wish to pause at every position; this is called as 'Guard Tour'.

Guard Tour Name Running Mode Guard Tour Name=no sequential • Guard Tour List : Add Edit Start / Stop Remove

Before you can use this function, you have to define at least 2 positions in 'Preset Points' section (refer to last section for detailed information).

The descriptions of every setting in this menu will be given below:

ItemDescription
AddAdd a new set of guard tour (see instructions below)
EditEdit a selected guard tour. The parameters for an existing guard tour will be recalled and you can modify them.
Start / StopSelect a guard tour and click this button to start guard tour, click again to stop it. After a guard tour has been started, go to ‘Camera’ menu to see it in action. Only one guard tour can be activated at the same time.
RemoveRemove a guard tour from the list.

If you wish to add a new set of guard tour, click 'Add' to start to add a new guard tour set:

Setup Guard Tour ✓ Name : Guard Tour Name ✓ View With Random Order ✓ Available Positions : Point-1 Point 1 Add to list Position View Time View Order Remove Save Close Done Internet

The descriptions of every setting in this menu will be given below:

ItemDescription
NameInput the name of this set of guard tour here. As you may have many sets of guard tour, please give it a meaningful name so you can remember the main purpose of this set.
View with random orderDo not visit all positions in this guard tour by order; visit them randomly instead.
Available positionsSelect preset points from dropdown menu here, then click ‘Add to list’ to add this position to this guard tour.When you click ‘Add to list’, you’ll be prompted to set these parameters: Edimax IC-7000PTn - Guard Tour - 3View Time: Define the time you wish the camera to stop at this position in seconds.View Order: Give this position a number greater than 1 and not the same with other positions, and guard tour will start visiting positions by order (from 1 to last number, and then start from 1 again).Remove: Remove this position from list.Save: Save settings for this position.Close: Close this window and discard all changes.

2.4 Network Settings

All network-related settings can be found in this menu, and you have to specify TCP/IP parameters in this menu if you want to change IP address, use PPPoE, Dynamic DNS, and activate UPnP function.

You can access this menu by clicking 'LAN' on the top of web management interface.

Edimax IC-7000PTn - Network Settings - 1

flowchart
graph LR
    A["Camera"] --> B["Video"]
    B --> C["Pan & Tilt"]
    C --> D["Network"]
    D --> E["Motion Detection"]
    E --> F["System"]
    F --> G["Account"]
    G --> H["SDHC"]

After you selected 'Network', network setting menu will appear. There are 6 sub-menus available here:

Network
LANWLANDynamic DNSUPnPLoginFreeRTSP

Please click the network setting you wish to set, and then refer to instructions given below:

2.4.1 LAN

You can define IP address and select the port number you wish to use here.

LAN

✓ Network Type : ○ DHCP ● Static IP Address ✓ IP Address : 192.168.3.3 ✓ Subnet Mask : 255.255.255.0 ✓ Gateway : 192.168.2.254 ✓ Primary DNS : 168.95.1.1 ✓ Secondary DNS : ✓ Web Port : 80

PPPoE

Enable PPPoE : User Name : Password : MTU : 1392 (512<=MTU Value<=1492) Apply Enable Disable

The descriptions of every setting in this menu will be given below:

ItemDescription
Network TypeThis camera can obtain the IP address from DHCP server automatically (if you have one), or set a fixed IP address. Select ‘DHCP’ to obtain IP address automatically or ‘Static IP Address’ to assign this IP camera with a fixed IP address.When ‘DHCP’ is selected, IP address parameters below will be grayed out.
IP AddressSpecify the IP address for this IP camera here.
Subnet MaskSpecify the subnet mask for this IP camera here.
GatewaySpecify the gateway address of the local network here.
Primary DNSSpecify the IP address of DNS server here. Please input IP address only. If you don’t know the address of DNS server, ask network administrator or your ISP for help.
Secondary DNSSpecify the IP address of backup DNS server here. When primary DNS is unreachable, IP camera will use the IP address specified here as DNS server.This field is optional.
Web PortSpecify the port number of web management interface here. If it’s not 80, you’ll have to add ‘:port’ after the IP address / hostname of this IP camera.For example, if the HTTP port number you specified here is 90 and the IP address of IP camera is 10.20.20.30, then you have to input ‘http://10.20.20.30:90’ in the address bar of Internet explorer.
Enable PPPoESelect ‘Enable’ to activate PPPoE function of this IP camera, select ‘Disable’ to disable it.
User NameInput the PPPoE username assigned by your ISP here.
PasswordInput the PPPoE password assigned by your ISP here.
MTUInput the MTU (Maximum Transmission Unit) given by your ISP here. Ask your ISP if you don’t know what value you should input here. Default value should work with most of ISPs and will give you a nice network

performance.

Click 'Apply' to save settings and make the new settings take effect.

2.4.2 WLAN

Wireless LAN ✓ Wireless Connection : ○ Enable ● Disable ✓ Network Type : Infrastructure ✓ ✓ Available Networks : Refresh Connect SSID MAC Address Signal Channel Encryption Network Type ● 00:07:40:FE:60:7E ▼ 4 WPAPSK(TKIP) Infrastructure ○ books 00:1B:11:62:84:68 ▼ 8 WPA2PSK(AES) Infrastructure SSID : ✓ Channel : 1 ✓ Wireless Key : ••••••••••••••••••••••••••••••••••• Apply WPS ✓ Self PinCode : 31500203 ✓ Configure via Push Button : Start PBC ✓ Configure via PinCode : Registrar SSID : Start PIN

The descriptions of every setting in this menu will be given below:

ItemDescription
Wireless ConnectionSelect ‘Enable’ to activate wireless network function of this IP camera, select ‘Disable’ to disable it.
Network TypeSelect the network type of wireless connection.Available options are ‘Infrastructure’ (Connect the IP camera to a wireless access point), and ‘Adhoc’ (This IP camera will become a stand-alone wireless network point, other wireless computers / devices can discover this IP camera and connect to it without wireless accesspoint).You can set to ‘Adhoc’ when you don’t have any wireless access point, but your computer has wireless network card. Set to ‘Infrastructure’ when you have wireless access point, and you have computers with wired network connection.
Available NetworksHere shows all wireless access points found by this IP camera. Please note not all access points will be displayed at the same time, if the access point you expected to connect does not appear, you may have to click ‘Refresh’ button for several times until it appears.The descriptions of all fields is listed below:Connect: You can select the wireless access point you wish to connect here.SSID: the SSID of all found wireless access points will be shown here. Some wireless access point may hide their SSID; in this case, you have to identify them by their MAC address.MAC Address: If you there are many wireless access points in proximity or some wireless access point hides it’s SSID, you can use MAC address to distinguish them. Signal: Shows the radio signal strength in percent. Channel: Shows the radio channel of this wireless access point.Encryption: Shows the encryption type used by this wireless access point. You must use the same encryption type if you wish to connect to a certain wireless access point. If the wireless access point does not use encryption, ‘Disabled’ will be displayed here.Network Type: Shows the network type of a certain wireless access point (Infrastructure or Adhoc).
SSIDInput the SSID of the wireless access point you wish to connect. It should be less than 32 alphanumeric characters.When you select a wireless access point above, it's SSID will be filled in this field automatically. However, if the SSID is not displayed (the wireless access point you selected choose to hide it's SSID), you have to know it's SSID and input it here, or you will not be able to connect it.
ChannelSelect the radio channel you wish to use here. When network type is ‘Infrastructure’, the radio channel is auto-selected according to the channel that wireless access point uses. You can only select the channel number when network type is ‘Adhoc’.
Wireless KeyInput the encryption key of selected wireless access point here. This is required when access point you wish to connect uses encryption.
Self PinCodeHere displays the WPS pin code used to connect to WPS-enabled wireless access points. You have to input this number into the WPS enabled access point to establish WPS connection.
Configure via Push ButtonClick this button and this camera will enter PBC-style WPS connection state for 120 seconds. Please push ‘Start PBC’ button on the wireless access point you wish to connect within 120 seconds to establish WPS connection (The remaining time will be displayed on the button).If connection can not be established after 120 seconds, you’ll be prompted by a message box, and you can press ‘Start PBC’ button to try again.
Configure via PinCodeIf you have wireless access point’s WPS PIN code, you can input it here and press ‘Start PIN’ button to start to establish PIN-style WPS connection.

2.4.3 Dynamic DNS

If your ISP does not give you a fixed Internet IP address (i.e. the Internet address you're using when you access the Internet is not always the same – ask your ISP for detailed information), you can use this function to help you locate the IP address of this IP camera when you're away from home or office.

Before you can use this function, you'll need to apply for an account at dyndns.org (http://www.dyndns.org). Detailed instructions of how to apply a new account can be found on dyndns.org's website.

Dynamic DNS

Enable DDNS :

○ Enable ● Disable

Provider :

dyndns.org

Host Name :

ddns-host

User Name :

ddns-account

√ Password :

●●●●●●●●●●●●

Apply

The descriptions of every setting in this menu will be given below:

ItemDescription
Enable DDNSSelect ‘Enable’ to activate Dynamic DNS function of this IP camera, select ‘Disable’ to disable it.
ProviderSelect dynamic DNS service provider here. Only dyndns.org is available currently.
Host NameInput dynamic DNS host name here.
User NameInput dynamic DNS user name here, must be the same as the one you applied on dyndns.org.
PasswordInput dynamic DNS password here, must be the same as the one you applied on dyndns.org.

Click 'Apply' to save settings and make the new settings take effect.

2.4.4 UPnP

When UPnP function is activated, all UPnP-compatible computers / network devices will be able to discover this IP camera automatically (only those in the same local network).

This function is useful and you don't have to remember the IP address of this IP camera. Simply open 'Network neighbor' and it's there!

UPnP ✓ Enable UPnP : Enable Disable Apply

The descriptions of every setting in this menu will be given below:

ItemDescription
Enable UPnPSelect ‘Enable’ to activate UPnP function of this IP camera, select ‘Disable’ to disable it.

Click 'Apply' to save settings and make the new settings take effect.

After UPnP function is activated, a popup message will appear:

IC-E52C85 A new device is now available on your network. For more information, click here.

Click the message to open 'My Network Places', and you'll see the IP camera:

My Network Places File Edit View Favorites Tools Help Back Search Folders Address My Network Places Go Network Tasks Add a network place View network connections Set up a home or small office network Set up a wireless network for a home or small office View workgroup computers Hide icons for networked UPnP devices Local Network IC-E52C85

You can double-click the icon to launch Internet Explorer and log onto IP camera's web management interface directly.

2.4.5 LoginFree

This camera provides a method to let unauthorized users to view the image captured by this camera, which is called as 'LoginFree'. When you wish to let everyone to view the image captured by this camera, or integrate the image with your own web application, you can use this function:

LoginFree ✓ Filename : jpg Apply

Input the filename here, and click 'Apply' to save settings, then other users can access the image by this filename with .jpg extension with the camera's IP address as prefix. For example, if your camera's IP address is '192.168.2.1' and the filename you set here is 'picture', then everyone on the web can access the image captured by this camera by using the following address:

http://192.168.2.1/picture.jpg

Please note that no authentication will be required to see the captured image. If you wish to disable this function, clear the text in 'Filename' field and click 'Apply.

http://192.168.98.215/picture.jpg - Microsoft Internet Explorer File Edit View Favorites Tools Help Back Search Favorites Go Unio Address http://192.168.2.1picture.jpg 1970.01.01 10:08:18 Done Internet

2.4.6 RTSP

If you want to watch video captured by this IP camera by your own RTSP (Real Time Streaming Protocol) media player, you can use this function to setup RTSP parameters, so your RTSP-compatible player will be able to receive video data.

Video Streaming

RTSP Port : 554 MPEG4 RTSP Path : ipcam .sdp H264 RTSP Path : ipcam_h264 .sdp RTP Port Range : 50000 - 60000 Apply

The descriptions of every setting in this menu will be given below:

ItemDescription
RTSP PortInput the port number of RTSP here. Default setting is 554.
MPEG4 RTSP PathInput the path of MPEG4 RTSP video file. When you use RTSP-compatible media player to play RTSP stream, please remember to add ‘.sdp’ file extension.
H.264 RTSP PathInput the path of H.264 RTSP video file. When you use RTSP-compatible media player to play RTSP stream, please remember to add ‘.sdp’ file extension.

2.5 Motion Detection

When you wish to use this camera to monitor the activities, motion detection function will be very useful. Camera will detect the motion in captured image, and take a snapshot when motion is detected. So you can use this camera to keep the safety of the belongings you have.

To use motion detection, click the following link from the top of menu:

Edimax IC-7000PTn - Motion Detection - 1

flowchart
graph LR
    A["Camera"] --> B["Video"]
    B --> C["Pan & Tilt"]
    C --> D["Network"]
    D --> E["Motion Detection"]
    E --> F["System"]
    F --> G["Account"]
    G --> H["SDHC"]

After you selected 'Motion Detection', a sub-menu will appear. There are 5 sub-menus available here:

Motion DetectionMotion RegionE-MailFTP ConfigurationSD Card Configuration

Detailed descriptions of every setting will be given below.

2.5.1 Motion Detection

You can use this menu to setup basic motion detection settings:

Motion Detection

√ Enable Motion Detection :
√ Motion Detection Interval :
Recording Time :
√ Sending File Type :
√ Send snapshot file to FTP :
√ Send snapshot file to E-Mail :

Enable Disable
5 seconds
3
JPEG
○ Enable ● Disable
○ Enable ● Disable

SD Card

SD Card Record :
√ Storage File Type :
Record File Size :

○ Enable ◦ Disable
Anonymous
[Non-Text]
The image contains no text or characters. It is a blank rectangular box with no visible content, figures, or markings. Therefore, there is no OCR result to generate.
192.168.3.61
share
JPEG
10 MBytes (Max 100 MB)
Apply Samba Test

The descriptions of every setting in this menu will be given below:

ItemDescription
Enable Motion DetectionSelect ‘Enable’ to enable motion detection, and select ‘Disable’ to disable this function.
Motion Detection IntervalSelect the time interval between two motions from dropdown menu. When a motion is detected, camera will not detect any motion again within the time interval you specified here. Available options are from 0 second (always detect new motion) to 60 seconds.
Recording TimeSelect the duration you wish this camera to record image when a motion is detected from dropdown menu. Available options are 1, 2, 3, 4, and 5 (seconds).
Sending File TypeSelect the file type that will be saved when a motion is detected. Select 'JPEG' and a still picture in JPEG format will be saved; and select 'AVI' to save a motion video clip.
Send snapshot file to FTPSelect 'Enable' to send the saved file to appointed FTP server when a motion is detected, select' Disable' to disable this function. You have to configure FTP server parameters in 'FTP Configuration' menu first, so this function will take effect (see below).
Send snapshot file to E-MailSelect 'Enable' to send the saved file to appointed E-mail address when a motion is detected, select' Disable' to disable this function. You have to configure mail server parameters in 'FTP Configuration' menu first, so this function will take effect (see below).
SD Card RecordSelect 'Enable' to record detected motion to SD card (if there's one), and select 'Disable' to disable this function.
Storage File TypeSelect saving file type for motion detection: JPEG (still picture) or AVI MPEG4 / AVI H264 (for motion picture).
Record File SizeInput the maximum file size of saved file in Mbytes. Maximum file size is 100.
Record to FolderSelect 'Enable' to save file to a network folder which supports SAMBA (also known as 'Windows Network Neighborhood'), select 'Disable' to disable this function.
AuthenticationIf username and password are not required to write files in specified folder, select 'Anonymous'; if required, select 'Account'.
User NameInput user name required by destination network folder.
PasswordInput password of the user name required by destination network folder.
Samba ServerInput the IP address or host name of network file server.
Shared FolderInput the folder name on file server.
Storage File TypeSelect saving file type for motion detection: JPEG (still picture) or AVI MPEG4 / AVI H264 (for motion picture).
Record File SizeInput the maximum file size of saved file in Mbytes. Maximum file size is 100.

Click ‘Apply’ to save settings and make the new settings take effect.

2.5.2 Motion Region

You can define the motion detection region within the image that camera captures, so this camera will ignore motions which are not covered by the motion region setting, and reduce the chances of false alarm.

2009.01.01 20:17:10 IC-A31201 Region3 Region1 Region2 Region1 Sensitivity 90 90 90 Refresh Save

The descriptions of every setting in this menu will be given below:

ItemDescription
Region 1 – 3Check the box to enable motion detection region 1 to 3. You can check multiple boxes to enable multiple motion detection regions. When you checked a box, a new region (and region number) will be displayed on captured image.
SensitivityMove the slide bar to change the motion detection sensitivity setting: Drag the slide to the right to increase sensitivity (camera will detect minor changes in the image), and drag the slide to the left to decrease sensitivity (camera will only detect major changes in the image).
RefreshIn case the objects of the image captured by the camera moved, click this button to reload the image captured by camera, so you can decide the motion detection region more precisely.
SaveSave motion detection region settings.

To change the motion detection region, you can ‘resize’ and ‘reposition’ it:

Edimax IC-7000PTn - Motion Region - 2

natural_image Illustration of a military jet on a pink surface (no text or symbols visible)

Move the mouse cursor to the eight dots located at the border of motion detection region, and the mouse cursor will switch to ↔ , or ↓ . You can click and hold mouse button and move the mouse to resize the motion detection region.

To move reposition the motion detection region, move the mouse within the motion detection region, and the mouse cursor will switch to . Click and hold mouse button and move the mouse to reposition the motion detection region.

2.5.3 Email

You can define the destination address of E-mail sending and mail server parameters here.

E-Mail

Recipient E-Mail Address : E-Mail Subject : Motion Detection Notification SMTP Server : Sender E-Mail Address : SMTP Port : 25 SMTP enable SSLv2N3 function : Enable Disable SMTP Authentication : Enable Disable User Name : Password : Apply Send a test email

The descriptions of every setting in this menu will be given below:

ItemDescription
Recipient E-Mail AddressInput the email recipient's Email address here.
E-Mail SubjectSpecify the title of sending email, so you can identify the mail sent from this camera from others quickly.
SMTP ServerInput the IP address or host name of the SMTP server (the server that delivers the Email for you) here.If you don't know, please refer to the SMTP server you're using in your Email software (like Outlook, Outlook Express etc.), or ask your network administrator or ISP.
Sender E-Mail AddressInput the Email address of mail sender, this will help you to identify the Email sent by this IP camera by sender's Email address.NOTE: Some mail server would reject to deliver the Email from unknown sender, it's recommended to input your own Email address here, or any other actual one.
SMTP PortYou can set port number according to your mail server.
SMTP enable SSLv2/v3functionSelect 'Enable' if your SMTP server supports SSLv2/v3 such as gmail.
SMTP AuthenticationSome SMTP server requires mail senders to be authenticated before they can send Email. If your SMTP server requires you to do so, please select ‘Enable’, or select ‘Disable’ to disable it. If you don’t know, please refer to the SMTP server you’re using in your Email software (like Outlook, Outlook Express etc.), or ask your network administrator or ISP.
User NamePlease input the user name of SMTP server here, if your SMTP server requires the use of authentication.
PasswordPlease input the password of SMTP server here, if your SMTP server requires the use of authentication.

Click ‘Apply’ to save settings and make the new settings take effect.

After that, you can click 'Send a test email' to send a testing Email to the address you set here, so you can make sure the setting you specified here is correct and working.

2.5.4 FTP Configuration

You can set FTP server's parameters here.

FTP Configuration ✓ FTP Server : ✓ FTP Port : 21 ✓ User Name : ✓ Password : ✓ Remote Folder : ✓ Passive Mode : Enable Disable Apply Upload a test file

The descriptions of every setting in this menu will be given below:

ItemDescription
FTP ServerInput the IP address or host name of the FTP server you wish to use here.
FTP PortInput the port number of the FTP server you wish to use here.
User NameInput the user name of the FTP server you wish to use here.
PasswordInput the password of the FTP server you wish to use here.
Remote FolderInput the remote folder name on the FTP server here. If nothing is specified here, all uploaded image files will be placed in FTP server's root directory.Please ask FTP server's administrator to know which folder you should use. Certain user name may have restrictions and therefore can not place the file in the directory not owned by the user.
Passive ModeSelect ‘Enable’ to use passive mode to send file, or select ‘Disable’ to not to use passive mode to send file.Some FTP servers require passive mode, if you don't know, please ask FTP server's administrator; most of FTP servers will work fine with both modes, but if youfound that non-passive mode is not working, you can try to use passive mode.

Click ‘Apply’ to save settings and make the new settings take effect.

After that, you can click 'Upload a test file' to send a file to the FTP server you set here, so you can make sure the setting you specified here is correct and working.

2.5.5 SD Card Configuration

You can define the filename and destination folder when saving a file in SD card.

SD Card Configuration

Enable Cycle Recording

File Name Prefix :
√ Destination Folder :

Edimax IC-7000PTn - SD Card Configuration - 1

Edimax IC-7000PTn - SD Card Configuration - 2

The descriptions of every setting in this menu will be given below:

ItemDescription
Enable Cycle RecordingCheck this box and this camera will automatically erase oldest image file to make rooms for new image files when SD card is full. If you don’t want to lose old image files, do not check this box.
File Name PrefixSpecify the filename prefix (the texts which will be added before the file sequence number).
Destination FolderSpecify the folder name that camera will store the saved image or video clip.

Click 'Apply' to save settings and make the new settings take effect.

2.6 System Info

You can use this menu to get the operational information of this camera:

Camera Video Pan & Tilt Network Motion Detection System Account SDHC

After you selected 'System Info.', a sub-menu will appear. There are 4 sub-menus available here:

Camera InformationDate / Time SettingScheduleUtilitiesStatusSystem Log

Detailed descriptions of every setting will be given below.

2.6.1 Camera Information

Camera information allows you to set the name and administrator's password of this camera.

Camera Information ✓ Camera Name : IC-5010PTn ✓ Password : ••••• ✓ Confirm Password : ••••• Apply

The descriptions of every setting in this menu will be given below:

ItemDescription
Camera NamePlease specify the name of this IP Camera here. This can be used to identify your camera on the network when you have more than one IP camera in the same network.Default name begins with ‘IC-‘ plus the last 6 characters of the MAC address of this IP camera. You can modify the name to the one you can remember and meaningful to you, but never give all IP cameras in the same network with same name.
PasswordPlease specify user name ‘admin’ ‘s password here. (The one you need when you log onto web management interface and use ‘admin’ as user name.
Confirm PasswordPlease input the same password again, to make sure there’s no typo.

Click 'Apply' to save settings and make the new settings take effect.

2.6.2 Date / Time Setting

This setting allows you to change the date and time of the real time clock in this IP camera. You can set the time manually, or use network time protocol (NTP) to set the time automatically.

Date / Time Setting
Set Date/Time manually NTP Server ✓ Time Zone : ✓ NTP Server : ✓ Daylight Saving Time : Apply Synchronize to PC time (GMT+08:00) Taipei pool.ntp.org Yes No

The descriptions of every setting in this menu will be given below:

ItemDescription
Set Date/Time manually / NTP ServerIf you select ‘Set Date/Time manually’, you can set the date and time of this camera manually. Please input the date and time you wish to set here.Date / time format is YYYY / MM / DD HH:MM:SS Time is in 24-hour format.You can click ‘Synchronize to PC time’ to use the time of the computer you’re using.Example: 24^th August 2007 = 2007/ 08 / 24,and PM 9:24:30 = 21:24:30If you select ‘NTP Server’, the camera will get the date and time from NTP Server automatically.
Time ZonePlease select the time zone of the country / city of resident from dropdown menu here.
NTP ServerPlease input the IP address or host name of NTP server here. You can use default value ‘pool.ntp.org’, or ask your ISP for the IP address or host name, if they have one.
Daylight SavingIf your area of residence uses daylight saving, select
Time‘Yes’; otherwise select ‘No’.
Synchronize to PC timeClick to input current time of your computer to ‘Set Date / Time manually’ field.

Click ‘Apply’ to save settings and make the new settings take effect.

If you wish to use the date and time setting of the computer which is connecting to the camera, click 'Synchronize to PC time' button. The date and time setting of the computer will be filled to date and time setting in this page.

2.6.3 Schedule

You can use this menu to setup Schedule Snapshot/Recording settings:

Schedule Snapshot ✓ Enable FTP Schedule : ✓ Time Interval : ✓ File Control : ✓ Enable E-Mail Schedule : ✓ Time Interval : Schedule Recording ✓ Enable Schedule Recording : ✓ Time Interval : ✓ Recording Time : ✓ Send Recording File to FTP : ✓ File Control : ✓ Send Recording File to E-Mail : Apply ○ Enable ○ Disable ○ Upload one image to FTP server every 1 hour(s) /Frame ○ Upload one image to FTP server every 2 Frames per Second ○ Upload files with filename composed of date / time ○ Overwrite file with the same filename : snapshot.jpg ○ Enable ○ Disable Send one image every 1 hour(s) Apply ○ Enable ○ Disable Send one recording file every 0 minute(s) 10 seconds (from 1 second to 10 seconds) ○ Enable ○ Disable ○ Upload files with filename composed of date / time ○ Overwrite file with the same filename : record.avi ○ Enable ○ Disable

ItemDescription
Enable FTP ScheduleSelect ‘Enable’ to send the Schedule Snapshot to the appointed FTP server, or select ‘Disable’ to disable this function. You have to configure FTP server parameters in ‘FTP Configuration’ menu first, so this function will take effect.
Time IntervalYou can choose to upload one image to FTP server according to the time interval you wish, or choose to upload image as you wish to FTP server every second.
File ControlThis option allows you to choose to upload each schedule snapshot with different file name composed of date/time, or to choose to upload the schedule snapshot with the same file name you wish. If you choose the latter, the prior-saved schedule snapshot will be overwritten by the latest schedule snapshot.
Enable E-Mail ScheduleSelect ‘Enable’ to send the Schedule Snapshot to the appointed e-mail address, or select‘ Disable’ to disablethis function. You have to configure e-mail settings in ‘Email’ menu first, so this function will take effect.
Time IntervalThis option allows the IP camera to send one image according to the time interval you wish.
Enable Schedule RecordingSelect ‘Enable’ to enable schedule recording, or select ‘Disable’ to disable this function.
Time IntervalThis option allows the IP camera to send one recording file according to the time interval you wish.
Recording TimeThis option allows you to adjust the recoding time based on your preference.Note:The available recording time is based on the video resolution and video frame rate settings in ‘Video’ menu.
Send Recording File to FTPSelect ‘Enable’ to send the recoded video to the appointed FTP server, or select‘ Disable’ to disable this function. You have to configure FTP server parameters in ‘email & FTP’ menu first, so this function will take effect.
File ControlThis option allows you to choose to upload each recorded video with different file name composed of date/time, or to choose to upload the recorded video with the same file name you wish. If you choose the latter, the prior-saved recorded video will be overwritten by the latest recorded video.
Send Recording File to E-MailSelect ‘Enable’ to send the recorded video to the appointed e-mail address, or select‘ Disable’ to disable this function. You have to configure e-mail settings in ‘email & FTP’ menu first, so this function will take effect.

2.6.4 Utilities

This menu allows you to upgrade firmware, clear all settings, reboot the IP camera, and switch LED lights on/off.

Utilities

√ Upgrade Firmware :
√ Reset To Factory Defaults :
Reboot Device :
LED Setting :

Browse... Upgrade Reset Reboot Turn off LED light

The descriptions of every setting in this menu will be given below:

ItemDescription
Upgrade FirmwareIf you downloaded latest firmware file from our website, you can click 'Browse' button to pick a firmware file located on your computer's hard drive and you can upload the firmware file to the IP camera later.After you selected a proper firmware file from your computer, click 'Upgrade Firmware' button to start upgrade. DO NOT DISCONNECT NOW!If the firmware file you provided is invalid of you didn't provide the firmware file, you'll be prompted to select another valid firmware file again.The IP camera will reboot after the upgrade procedure is done. PLEASE NOTE THAT THE IP ADDRESS OF THE CAMERA WILL RESET TO DEFAULT VALUE: 192.168.2.3
Reset to Factory DefaultsClear all settings in the camera. Please think again before you do this, and then click this button to reset all settings.NOTE: IP address will be reset to default value '192.168.2.3' also. You'll need to change the IP address
setting of your computer if the IP address of your computer does not begin with ‘192.168.2’, and subnet mask is not ‘255.255.255.0’, or you’ll not be able to connect to this IP camera again.
Reboot DeviceIf you found the IP camera is responding slowly or behaves strange, you can click this button to try to reboot the IP camera, this may help.
LED SettingClick ‘Turn off LED light’ button to switch the LED light of this IP camera off, so all LEDs on the IP camera will stop working, in case you don’t want other people know the camera is transferring data.You can click this button again to switch LED lights on again.

Click 'Apply' to save settings and make the new settings take effect.

2.6.5 Status

This menu provides all information about this IP camera, like firmware version, system uptime, date / time, and network information.

System

√ Firmware Version : v1.4 (Dec 31 2009 14:46:39)
√ Device Uptime : 12 hours 24 min 27 sec
System Time : 2009/01/01 20:24:12

LAN

IP Address : 192.168.3.3
Subnet Mask: 255.255.255.0
Gateway:
DNS Server : 168.95.1.1
√ MAC Address : 00:01:55:A3:12:01
HTTP Port: 80

PPPoE

√ Link Status : Disconnected
IP Address :
Subnet Mask:
Gateway:
DNS Server:

2.6.6 System Log

All activities of this IP camera will be logged, and you are allowed to enter 'System Log' menu to view these logs.

System Log

1970/01/01 00:00:13 Failed to open PT device!
1970/01/01 00:00:13 System startup [ v1.0 (May 4 2010 18:09:39) ]
2010/01/01 00:00:00 Start Storage Manager.. (PID:67)
2010/01/01 00:00:00 No storage medium found.
2010/01/01 00:00:00 Start Samba Storage Manager.. (PID:68)
2010/01/01 00:00:00 Set microphone volume to 80
2010/01/01 00:00:00 Set Line-Out volume to 80
2010/01/01 08:00:00 embedded av stream server started PID:72

2010/01/01 08:00:00 Failed to open PT device!
2010/01/01 08:00:00 Starting mpeg4 pipe server for Spook
2010/01/01 08:00:00 Starting h264 pipe server for Spook
2010/01/01 08:00:00 Starting audio pipe server for Spook
2010/01/01 08:00:00 embedded av stream controller started (PID:81)
2010/01/01 08:00:00 Opened /dev/pl_grab successfully
2010/01/01 08:00:01 Opened /dev/pl_enc successfully (MPEG4)
2010/01/01 08:00:01 Opened /dev/pl_enc successfully (MJPEG)
2010/01/01 08:00:01 Opened /dev/pl_264 successfully (H264)
2010/01/01 08:00:01 Opened /dev/pl_enc successfully (MD)
2010/01/01 08:00:01 Accepted a new connection from spook... (mpeg4 video)
2010/01/01 08:00:01 Accepted a new connection from spook... (h264 video)
2010/01/01 08:00:01 Accepted a new connection from spook... (audio)
2010/01/01 08:00:04 Schedule AVI system started (PID:62)
2010/01/01 08:00:04 E-mail schedule system started (PID:61)
2010/01/01 08:00:04 FTP schedule system started (PID:60) 

2.7 Account

If you wish to allow other people to view the live image captured by this camera, but don't want to allow them to modify system settings, you can give them user-level user name and password, so they can only view the image and can not change any system setting.

This camera supports up to 16 users.

Camera Video Pan & Tilt Network Motion Detection System Account SDHC

After you selected 'Account', you'll be prompted to input user account information:

Account user1 : operator User List : Login : Password : Confirm password : Authority : Operator Guest Add Modify Remove

The descriptions of every setting in this menu will be given below:

ItemDescription
User ListLists all users currently available.
LoginInput the login name (user name) of this account.
PasswordInput the password of this user here.
Confirm passwordInput the password of this user here again for confirmation.
AuthoritySelect the privilege of this user: Operator (able to enter camera & video menu) or Guest (view images only, but Guest account still needs to input User name/Passwordwhen accessing the camera).
AddClick this button to add the account.
ModifyModify an existing user's information. You have to select a user from user list first.
RemoveRemove an existing user. You have to select a user from user list first.

Click ‘Apply’ to save settings and make the new settings take effect.

Please note: only one user (including administrator) will be able to view the image of IP camera at the same time.

If you wish to allow other people to view the live image captured by this IP camera without typing User name/Password, you can enable “Anonymous Login” in Anonymous page.

2.7 SDHC

...

✓ Camera ✓ Video ✓ Pan & Tilt ✓ Network ✓ Motion Detection ✓ System ✓ Account ✓ SDHC

After you selected 'System Info.', a sub-menu will appear. There are 4 sub-menus available here:

Status

Space Alarm

File Management

Please click the SD card setting you wish to set, then refer to instructions given below:

2.7.1 Status

Here shows the remaining card space for you.

Edimax IC-7000PTn - Status - 1

bar_stacked | Status | Value (KB) | | :--- | :--- | | Total Space | 3979776 | | Used Space | 1414944 | | Free Space | 2564832 | | Segment Color | Pink | | Blue Segment | Blue | | Percentage (%) | 64% |

2.7.2 Space Alarm

When you're using SD card to store captured image and video clip, you can have this camera to send an E-mail to you when there's only little remaining space left on SD card.

Space Alarm

√ Recipient E-Mail Address :
E-Mail Subject :
SMPT Server :
Sender E-Mail Address :
SMTP Port:
SMTP enable SSLv2V3 function :
SMPT Authentication :
User Name :
√ Password :
Reserved Space :

[SD Card Space Alarm] 25 Enable Disable Enable Disable 30 MB Apply Send a test email Copy M

Please note: If you have set E-mail settings in 'Motion Picture' function, you can click 'Copy Mail Config' button to use the same setting. However, you can use a different setting here.

The descriptions of every setting in this menu will be given below:

ItemDescription
Recipient E-Mail AddressInput the E-mail address you wish to receive space alarm.
E-Mail SubjectInput the title of space alarm E-mail.
SMTP ServerInput the SMTP server address you wish to use to send E-mail.
Sender E-Mail AddressInput the sender E-mail address of the space alarm E-mail.
SMTP PortYou can set port number according to your mail server.
SMTP enable SSLv2/v3 functionSelect ‘Enable’ if your SMTP server supports SSLv2/v3 such as gmail.
SMTPAuthenticationSelect ‘Enable’ if the SMTP server you’re using requires authentication, and input the username and password below; If the SMTP server you’re using does not require authentication, select ‘Disable’ here. If you’re not sure, ask your ISP or network administrator.
User NameType the user name of the user who has the mail account. This setting is necessary when the SMTP server which sends e-mails performs authentication.
PasswordType the password of the user who has the mail account. This setting is necessary when the SMTP server which sends e-mails performs authentication.
Reserved SpaceSelect the amount of SD card space which will be reserved and will not be used from dropdown menu.

Click ‘Apply’ to save settings and make the new settings take effect.

You can click 'Send a test email' button to send a test E-Mail by the configuration you set here.

2.7.3 File Management

You can use this menu to manage the files stored on SD card.

File Management

0-0 image(total 0) FirstPage PrevPage NextPage LastPage Delete Name Size Date SelectAll ClearAll Delete

The descriptions of every setting in this menu will be given below:

ItemDescription
FirstPageJump to first page of file list.
PrevPageJump to previous page of file list.
NextPageJump to next page of file list.
LastPageJump to last page of file list.
SelectAllSelect all files in this page.
ClearAllClear all files in this page.
DeleteDelete selected files.

Chapter III: Using Surveillance Software

3-1 Installing IP Camera Surveillance Software

The IP camera surveillance software provides various functions like video recording, after this software is installed, you can use your IP camera to safeguard your property. Please follow the following instructions to install the surveillance software.

  1. Click "16 channel viewer" in supplied CD-ROM, when the following window appears, click 'Next'.

Setup - IPCam Surveillance Software Welcome to the IPCam Surveillance Software Setup Wizard This will install IPCam Surveillance Software 3.0 on your computer. It is recommended that you close all other applications before continuing. Click Next to continue, or Cancel to exit Setup. Next > Cancel

  1. You can specify the destination folder of software installation, you can just use the default folder, and click 'Next' to continue.

Setup - IPCam Surveillance Software Select Destination Location Where should IPCam Surveillance Software be installed? Setup will install IPCam Surveillance Software into the following folder. To continue, click Next. If you would like to select a different folder, click Browse. C:\Program Files\IPCam Surveillance Software 3.0 Browse... At least 11.4 MB of free disk space is required. < Back Next > Cancel

  1. If you need installation program to create a desktop icon or a quick launch icon for you, click all items you need here, than click 'Next' to continue.

Setup - IPCam Surveillance Software Select Additional Tasks Which additional tasks should be performed? Select the additional tasks you would like Setup to perform while installing IPCam Surveillance Software, then click Next. Additional icons: Create a desktop icon Create a Quick Launch icon < Back Next > Cancel

  1. Here lists all options you chose in previous steps, if everything's correct, click 'Install' to start installing procedure, or click 'Back' to go back to previous step to modify installing settings.

Setup - IPCam Surveillance Software Ready to Install Setup is now ready to begin installing IPCam Surveillance Software on your computer. Click Install to continue with the installation, or click Back if you want to review or change any settings. Destination location: C:\Program Files\IPCam Surveillance Software 3.0 Additional tasks: Additional icons: Create a desktop icon < Back Install Cancel

  1. The installing procedure will take some time, please be patient.

Setup - IPCam Surveillance Software Installing Please wait while Setup installs IPCam Surveillance Software on your computer. Extracting files... C:\Program Files\IPCam Surveillance Software 3.0\Image\bg.bmp Cancel

  1. When you see this window, it means the software installing procedure is complete. Please click 'Finish' to finish the procedure (IP camera surveillance software will start after you click 'Finish' button, if you want to start it later, uncheck 'Launch IPCam Surveillance Software' box).

Setup - IPCam Surveillance Software Completing the IPCam Surveillance Software Setup Wizard Setup has finished installing IPCam Surveillance Software on your computer. The application may be launched by selecting the installed icons. Click Finish to exit Setup. Launch IPCam Surveillance Software Finish

3-2 Using IP camera surveillance software

You can click 'IPCam Surveillance Software' icon from desktop, quick launch bar, or start menu to start the IP camera surveillance software.

Before you start:

IP camera surveillance software will only work when your monitor's resolution is '1024 x 768'. Please change the resolution before you use IP camera surveillance software, or it won't start.

Here are descriptions for all components of IP camera surveillance software:

Video displaying area 1 No Signal 2 No Signal 3 No Signal 4 No Signal 5 No Signal 6 No Signal 7 No Signal 8 No Signal 9 No Signal 10 No Signal 11 No Signal 12 No Signal 13 No Signal 14 No Signal 15 No Signal 16 No Signal Close window (stop surveillance) / Minimize window Message display box Recording / System configure Playback / Snap shot Language Display layout Full screen / Scan Zoom Out / Zoom In PTZ Control / Home

You can put the mouse cursor on a certain component and see its button name, and here're detailed descriptions of all buttons:

ItemDescription
Video displaying areaThe image of all connected cameras will be displayed here.
LanguageSelect a language from this dropdown menu to change display language.
Display layoutEdimax IC-7000PTn - Before you start: - 2Change camera image display layout (Click a layout icon to change camera display layout). There are 8 kinds of available display layouts.
Full screenEdimax IC-7000PTn - Before you start: - 3Click this button to switch to full screen mode (only display all camera's image), press 'ESC' key to quit full screen mode.
ScanEdimax IC-7000PTn - Before you start: - 4Click this button and the IP camera surveillance software will switch displaying the image of all connected camera automatically. Click this button once to activate scan function (scan icon will become blue ), click again to stop scanning (scan icon will become white )
Zoom outEdimax IC-7000PTn - Before you start: - 5Zoom-out (To see more objects).This function is only available for supported cameras.
Zoom InEdimax IC-7000PTn - Before you start: - 6Zoom-in (Too see more details).This function is only available for supported cameras.
PTZ controlEdimax IC-7000PTn - Before you start: - 7There are 8 directions in PTZ control ring. If the camera you connect support PTZ, you can use PTZ control ring to change the direction that camera points to.This function is only available for supported cameras.
HomeEdimax IC-7000PTn - Before you start: - 8Click this button to return the camera to 'Home' (default) position.This function is only available for supported cameras.
RecordingEdimax IC-7000PTn - Before you start: - 9Start video recording.
ConfigureEdimax IC-7000PTn - Before you start: - 10Software / camera configuration.
PlaybackEdimax IC-7000PTn - Before you start: - 11Playback a recorded video file.
SnapshotEdimax IC-7000PTn - Before you start: - 12Take a snapshot of current camera.
Message displayDisplays all system messages like camera is disconnected etc.
Close window (stop surveillance)Edimax IC-7000PTn - Before you start: - 13Terminates IP camera surveillance software.
Minimize windowEdimax IC-7000PTn - Before you start: - 14Minimizes IP camera surveillance software window.
Video displaying areaDisplays the image of all cameras by the display layout you selected.

3-3 Configure IP camera surveillance software

3-3-1 Configure cameras

Before you use this IP camera surveillance software, you must configure the camera(s) you wish to connect. Please click 'System configure' button and a popup menu will appear:

Configure Cameras

General Options

Please select 'Configure Cameras' to configure cameras:

Note: If you're prompted by a windows security alert which asks you if you want to block 'IPCamViewer' program, please click 'Unblock' button, of IP camera surveillance software will not be able to function correctly.

Windows Security Alert To help protect your computer. Windows Firewall has blocked some features of this program. Do you want to keep blocking this program? Name: IPCamViewer Publisher: Unknown Keep Blocking Unlock Ask Me Later Windows Firewall has blocked this program from accepting connections from the Internet or a network. If you recognize the program or trust the publisher, you can unblock it. When should I unblock a program?

3-3-1-1 'Camera' tab

In this tab you can configure all cameras you wish to connect. Up to 16 cameras can be connected simultaneously:

Configure Cameras Channel Channel 1 Channel 2 Channel 3 Channel 4 Channel 5 Channel 6 Channel 7 Channel 8 Channel 9 Channel 10 Channel 11 Channel 12 Channel 13 Channel 14 Channel 15 Channel 16 Camera Schedule Recording Audio Motion Recording Camera Configuration 15 Name IC7000PTnV2 Model IP Address 192.168.2.105 Username admin Web Port 80 Password **** Reset Camera Search Camera Name IP Model Select Refresh OK Cancel

Here are the descriptions of all setting items:

ItemDescription
ChannelSelect the channel number you wish to set.
Camera SearchAll cameras found on your local network will be displayed in ‘Camera Search’ box.
SelectSelect a camera listed in ‘Camera Search’ box, and click ‘Select’ button to fill all parameters of selected camera in every camera configuration fields.
RefreshRescan all cameras on your local network. If you didn’t see the camera you expected in ‘Camera Search’ box, or new cameras has been joined to your local network after last scan.
Name*Input the name of camera here. Default value is the first 6 bytes of camera’s MAC address, you can change the name of camera so you can remember the camera’s location of purpose easily.
ModelDisplays the model of selected camera, this field can not be changed.
IP*Input the IP address of camera.
Username*Input the user name of camera.
Web Port*Input the web port of the camera. By default it's ‘80’.
PasswordInput the password of camera. Default value is ‘1234’. You should change the password if you changed the password of selected camera.
Video Format**Select the video encoding format of this camera (MJPEG or MPEG4).
ResetClear all fields in ‘Camera Configuration’ section.
OKSave settings in this tab.
CancelDiscard all settings in this tab.

*: It's recommended to use 'Select' button to fill the content of this field.
**: Only available for cameras support this function.

After you've set all channels you wish to set, click 'OK' to save settings, and if everything's correct, you'll see the camera's image in IP camera surveillance software's main menu:

2009.07.08 18:31:04 2 No Signal 3 No Signal 4 No Signal System Event Log

3-3-1-2 Schedule Recording

In this tab, you can setup scheduled video recording, so you can record the video captured by all cameras you have by a pre-defined schedule.

Configure Cameras Channel Channel 1 Channel 2 Channel 3 Channel 4 Channel 5 Channel 6 Channel 7 Channel 8 Channel 9 Channel 10 Channel 11 Channel 12 Channel 13 Channel 14 Channel 15 Channel 16 Camera Schedule Recording Audio Motion Recording One Time Schedules 2009/07/10 11:03:27 - 2009/7/10 11:10:27 New Edit Delete Weekly Schedules [ Sun Mon Tue Wed Thu Fri Sat ] 00:00:00 - 23:59:59 New Edit Delete OK Cancel

Here are the descriptions of all setting items:

ItemDescription
ChannelSelect the channel number you wish to set.
One Time SchedulesYou can specify the one-time schedule for selected camera; this schedule will be executed once only.
New (One Time Schedules)Click this button and a new window will appear:Edimax IC-7000PTn - 3-3-1-2 Schedule Recording - 2Please specify the time duration of this one-time schedule (the date and time of ‘From’ and ‘To’), then click ‘OK’ to save settings.Please note you must set a schedule that will be happened in the future, you can not set a schedule in the past.
EditYou can modify a scheduled recording item. Select a schedule in ‘One Time Schedules’ list, and click ‘Edit’ button to edit the start and end time of this schedule.
DeleteDelete a selected schedule item.
New(Weekly Schedules)Click this button and a new window will appear:Edimax IC-7000PTn - 3-3-1-2 Schedule Recording - 3You can define recording schedule that will be executed at the specified time of certain weekday(s) in a week.Please check all weekdays that applies, and set the start time in ‘From’ field. You can set the duration of video recording in ‘Period’ field (format is HH:MM:SS), and the end time will be calculated automatically and displayed in ‘To’ field. You can also click ‘All Time Record’ button to define a recording schedule that will be executed every weekday, from 12:00:00AM to 11:59:59PM.Click ‘OK’ to save changes.
EditYou can modify a scheduled recording item. Select a schedule in ‘One Time Schedules’ list, and click ‘Edit’ button to edit the start and end time of this schedule.
DeleteDelete a selected schedule item.
OKSave settings in this tab.
CancelDiscard all settings in this tab.

3-3-1-3 Audio

For cameras that support audio, you can use this tab to decide if you wish to hear the audio captured by selected camera.

Configure Cameras Channel Channel 1 Channel 2 Channel 3 Channel 4 Channel 5 Channel 6 Channel 7 Channel 8 Channel 9 Channel 10 Channel 11 Channel 12 Channel 13 Channel 14 Channel 15 Channel 16 Camera Schedule Recording Audio Motion Recording Audio Mute Audio Record Video Only OK Cancel

Here are the descriptions of all setting items:

ItemDescription
ChannelSelect the channel number you wish to set.
Mute AudioCheck this box and the IP camera surveillance software will not play the audio captured by this camera.
Record Video OnlyCheck this box and the IP camera surveillance software will not record the audio captured by this camera.
OKSave settings in this tab.
CancelDiscard all settings in this tab.

3-3-1-4 Motion Record

With this function activated, only motions captured by the camera will be recorded, so you don't have to waste hard disk storage space on images you don't need to pay attention to.

WARNING: For applications that security is highly concerned, it's not recommended to use this function since some tiny changes you may need to know may not be able to trigger the camera and the camera will not start recording.

Configure Cameras Channel Channel 1 Channel 2 Channel 3 Channel 4 Channel 5 Channel 6 Channel 7 Channel 8 Channel 9 Channel 10 Channel 11 Channel 12 Channel 13 Channel 14 Channel 15 Channel 16 Camera Schedule Recording Audio Motion Recording Motion Record Enable Disable Recording Time 10 seconds Invoke alarm when motion is triggered Send mail when motion is triggered OK Cancel

Here are the descriptions of all setting items:

ItemDescription
ChannelSelect the channel number you wish to set.
EnableEnable motion record function.
DisableDisable motion record function.
Recording TimeSelect the time duration that camera will record when a motion has been detected from dropdown menu in seconds.
Invoke alarm when motion is triggeredSend an alarm when a motion has been detected by the camera.
Send mail whenSend an email to a pre-defined address when a motion
motion is triggeredhas been detected by the camera.
OKSave settings in this tab.
CancelDiscard all settings in this tab.

3-3-2 General Settings

You can set system-wide settings of this IP camera surveillance software in this menu.

3-3-2-1 'General' tab

All general settings like file storage directory and recording spaces can be set here.

General Options General E-Mail Setting Security About Directory Information Data Directory C:\Users\JesseLiu\Documents Browse Free Recording Space 14243 MB General Settings Max Video File Size 50 MB Scan Time 3 second(s) Cycle Recording Disable 確定 取消

Here are the descriptions of all setting items:

ItemDescription
Data DirectorySet the directory (folder) you wish to store the recorded video and captured image. You can click ‘Browse’ button to pick a directory in your hard disk.
Free Recording SpaceDisplays remaining storage space.
Max Video File SizeDefines the maximum file size of every video file. When the size of file exceeds this value, IP camera surveillance software will open another file to record the video.
Scan TimeDefine the time period to pause between every camera switch when you activate ‘Scan’ function.
Cycle RecordingYou can decide the behavior when hard disk space is full:Disable: Do not overwrite recorded video files.Enable: Overwrite recorded video files.
OKSave settings in this tab.
CancelDiscard all settings in this tab.

3-3-2-2 'E-Mail Setting' tab

If you want to use motion detection function and wish to get an email that contains the image captured by the camera, please setup your email related parameters here first.

General Options General E-Mail Setting Security About E-Mail Subject Recipient E-Mail Address New Edit Delete Sender E-Mail Address SMTP Server SMTP Port 25 SMTP Auth Enable Disable SMTP Account SMTP Password 確定 取消

Here are the descriptions of all setting items:

ItemDescription
E-Mail SubjectSpecify the subject of sending email.
Recipient E-Mail AddressHere lists all email addresses you set.
NewClick this button and you’ll be prompted to input the email address. Click ‘OK’ to save changes.Edimax IC-7000PTn - 3-3-2-2 'E-Mail Setting' tab - 2
Edimax IC-7000PTn - 3-3-2-2 'E-Mail Setting' tab - 3
EditSelect an email address from ‘Recipient E-Mail Address’ box, and click ‘Edit’ to edit the email address.
DeleteDelete selected email address.
Sender E-Mail AddressSpecify the email address of email sender.
SMTP ServerSpecify the IP address or host name of the SMTP server you wish to use. For most of ISPs they will only allow its subscriber to use their SMTP server, if you don’t know which SMTP server you should use, please refer to the setting of your email software or ask your ISP / network administrator.
SMTP portSpecify the port number of the SMTP server you wish to use here. By default (and the setting of most of SMTP servers) it’s ‘25’.
SMTP AuthSelect ‘Enable’ if your SMTP server requires authentication, select ‘Disable’ if it’s not required. If you don’t know if your SMTP server requires authentication, please refer to the setting of your email software or ask your ISP / network administrator.
SMTP AccountInput the SMTP account (username) of your SMTP server here. In most cases, it’s the same with your POP3 username (the one you used to receive email). Please refer to the setting of your email software or ask your ISP / network administrator if you’re not sure about this.
SMTP PasswordInput the SMTP password of your SMTP server here. In most cases, it’s the same with your POP3 password (the one you used to receive email). Please refer to the setting of your email software or ask your ISP / network administrator if you’re not sure about this.
OKSave settings in this tab.
CancelDiscard all settings in this tab.

3-3-2-3 Security

If you don't want other people to access this IP camera surveillance software, you can set a password to protect it.

You'll need to input the password every time you wish to use this IP camera surveillance software:

Authentication required Please input password Password: OK Cancel

To set password, please use 'Security' tab in 'General Options' menu:

General Options General E-Mail Setting Security About Security Enable Disable Password Confirm Password 確定 取消

Here are the descriptions of all setting items:

ItemDescription
EnableRequires password authentication when this software starts.
DisablePassword authentication is not required when this software starts.
PasswordInput the password you wish to use here.
Confirm PasswordInput the password you wish to use here again.

3-3-2-4 About

This tab shows the version number of the IP camera surveillance software you're using.

General Options General E-Mail Setting Security About IP Camera Surveillance Software Information Version: v3.0.0.17 確定 取消

3-4 Change Display Layout

This IP camera surveillance software provides 8 kinds of display layout:

Edimax IC-7000PTn - 3-4 Change Display Layout - 1

natural_image Grid of nine identical gray squares arranged in 3x3 pattern, no text or symbols present

Every layout displays different number of camera and camera arrangement, you can click the icon that presents a specific kind of layout, and the video displaying area will change accordingly.

Layout style 1: 1Camera onlyEdimax IC-7000PTn - 3-4 Change Display Layout - 2Displays the video of 1 camera only.Edimax IC-7000PTn - 3-4 Change Display Layout - 3
Layout style 2: 4CamerasEdimax IC-7000PTn - 3-4 Change Display Layout - 4Displays the video of up to 4 cameras.Edimax IC-7000PTn - 3-4 Change Display Layout - 5
Layout style 3: 6 CamerasEdimax IC-7000PTn - 3-4 Change Display Layout - 6Displays the video of up to 6 cameras.Edimax IC-7000PTn - 3-4 Change Display Layout - 7
Layout style 4: 8 CamerasEdimax IC-7000PTn - 3-4 Change Display Layout - 8Displays the video of up to 8 cameras.Edimax IC-7000PTn - 3-4 Change Display Layout - 9
Layout style 5: 9 CamerasEdimax IC-7000PTn - 3-4 Change Display Layout - 10Displays the video of up to 9 cameras.Edimax IC-7000PTn - 3-4 Change Display Layout - 11
Layout style 6: 10 CamerasEdimax IC-7000PTn - 3-4 Change Display Layout - 12Displays the video of up to 10 cameras.Edimax IC-7000PTn - 3-4 Change Display Layout - 13
Layout style 7: 13 CamerasEdimax IC-7000PTn - 3-4 Change Display Layout - 14Displays the video of up to 13 cameras.Edimax IC-7000PTn - 3-4 Change Display Layout - 15
Layout style 8: 16 CamerasEdimax IC-7000PTn - 3-4 Change Display Layout - 16Displays the video of up to 16 cameras.Edimax IC-7000PTn - 3-4 Change Display Layout - 17

3-5 Full-screen mode

If you want to use all available spaces on your monitor to display surveillance image, you can click 'Full Screen' button to switch display mode to full-screen mode.

English

To exit full-screen mode, press 'ESC' key.

3-6 Scan

If you have more than one camera configured, and you wish to switch the displaying image between cameras, you can click 'Scan' button to switch between all configured cameras.

NOTE: If a camera is configured but disconnected, it will still be displayed in a scan sequence (you'll see nothing and you'll see 'Disconnected' text displayed at the upper-left corner of display image).

English

Click 'Scan' button once to activate scan function (scan icon will become blue), click again to stop scanning (scan icon will become white)

3-7 Zoom-in / Zoom-out

For cameras that support zoom-in / zoom-out function, you can use this function to see more objects that fall in the scope of camera's view, or enlarge the image size of a certain object to see its detail.

English

Please select a camera in video displaying area by clicking on its image, then click button to see more objects that fall in the scope of camera's view, or click to enlarge the image size of a certain object to see its detail (Before zoom-in, you may need to use PTZ buttons - described in next section) to find an object you wish to see its detail).

3-8 PTZ

For cameras that support pan - tilt function ( but this model doesn't support PTZ function), you can change the position that camera points to, to see different places that fall in the scope of camera's view.

English

Please select a camera in video displaying area by clicking on its image, and then click the directions you wish the camera to move to (total 8 directions available). Click 'Home' button ( ) to return to camera's home (default) position.

3-9 Snapshot

You can take a snapshot of selected camera and save it to 'Snapshot' sub-folder of pre-defined data directory.

Edimax IC-7000PTn - 3-9 Snapshot - 1

natural_image User interface buttons including video camera, wrench, play button, and camera icon (no text or symbols)

Click snapshot button once to take a snapshot; you can take as much snapshot as you want before hard disk is full.

3-10 Recording

You can start video recording of selected camera manually by clicking 'Start Recording' button:

Edimax IC-7000PTn - 3-10 Recording - 1

natural_image User interface buttons including video camera, wrench, play, and camera (no text or symbols)

When recording starts, you'll see a message displayed in message displaying box like '1/1 10:00:00, Camera 2 Start Manual', which means camera 1 starts recording manually on 1/1 at 10:00:00.

To stop recording, click 'Start Recording' button again, and you'll see a message displayed in message displaying box like '1/1 10:00:00, Camera 2 Stop Manual'.

3-11 Video Playback

You can playback all recorded video by clicking this button.

Edimax IC-7000PTn - 3-11 Video Playback - 1

natural_image User interface buttons including video camera, wrench, play button, and camera (no text or symbols)

A new window will appear:

Playback Time Search From 5/ 1/2008 12:00:00 PM To 5/30/2008 12:00:00 PM Search Motion Search From 5/ 1/2008 12:00:00 PM To 5/30/2008 12:00:00 PM Search Channel File Name 1 Manual_2008-5-20_12-0-13.avi 1 Manual_2008-5-20_12-5-9.avi 1 Schedule_2008-5-20_11-49-41.avi 1 Schedule_2008-5-20_11-50-58.avi 1 Schedule_2008-5-20_11-52-13.avi Play OK

You have to search the video file before you can play it. There are two kinds of video search: Time Search (search all videos file that falls in a specific period of time) and Motion Search (search all videos recorded by motion detection function and falls in a specific period of time).

Please define the start and end date / time of the time period you wish to search, and then click 'Search' button (of 'Time Search' of 'Motion' Search'). All found videos will be displayed, select the video you wish to play and click 'Play' button to playback.

Chapter IV: How to View IP Camera over the Internet with iPhone

IC-7010 series features iPhone support for iPhone users to monitor their home using Edimax IP-Cameras.

Please check following instruction for installation. The following instruction applies to all Edimax routers

Step1:

Ensure My-PC is Internet-ready via Router

Step 2:

Check with your ISP (Internet Service Provider) whether a Public and fixed IP address is assigned to you. An IP address is like an unique phone number that is totally different from all the others' for calling a particular person. You could browse the Internet or monitor your home over the Internet with iPhone by using this unique IP address. Therefore, an unique IP address is a Public and fixed IP address. With this, it's much easy for iPhone monitoring your home. For example, an IP address looks like numbers separated with a dot as: 192.168.2.3

(1) Fixed and public IP address:

All IP addresses different from the following are fixed and public IP address

10.0.0.0 - 10.255.255.255

172.16.0.0 - 172.31.255.255

192.168.0.0 - 192.168.255.255

Write down this IP address and go to Step 3. In this guide, we use a hypothetical IP address, 61.61.61.1 (yours is different)

(2) Dynamic IP address

If your ISP service staff cannot tell you what IP address is for you, you can still monitor your home with iPhone, but it turns more complicated.

Your IP address for browsing Internet will change by hours or by days.

Over 90% chance, you may get a dynamic IP address. There is a solution called Dynamic DNS (DDNS) for free. With this, you could register a name like http://my-name.dyndns.org for example to find out Edimax IP camera in the I-Phone. To apply for this, refer to the Appendix "How to apply for a free

DNS account in the http://www.dyndns.org " In this guide, we assume you have already got http://my-name.dyndns.org. (yours may vary) and go to Step 3.

Step 3:

Configure the 1 ^st Camera based on the following:

Configuration for the 1st camera LAN Audio/Video E-mail & FTP 1 Apply Click "LAN" LAN Network Type DHCP Static IP Address IP Address 192.168.2.10 Change the IP to 192.168.2.10 Subnet Mask 255.255.255.0 Gateway 192.168.2.1 This is the IP of Edimax router Primary DNS 168.95.1.1 Second DNS AV Control Port 4321 Web port 80 "Web port" 80 is preserved for the 1st camera

Configure the 2^nd Camera based on the following:

Configuration for the 2nd camera LAN Audio/Video E-mail & FTP 1 Apply Click "LAN" LAN Network Type DHCP Static IP Address IP Address 192.168.2.20 Change the IP to 192.168.2.20 Subnet Mask 255.255.255.0 This is the IP of Edimax router Gateway 192.168.2.1 Primary DNS 168.95.1.1 Second DNS AV Control Port 4321 Web port 82 "Web port" 82 is preserved for the 2nd camera

Configure the Broadband Router based on the following:

Quick Setup | General Setup | EZ View | Status | Tools | Home / General Setup / Advanced Settings / NAT / Virtual Server 1 Go to "Virtaul server" setup page Enable Virtual Server Private IP Computer name Private Port Type/Public Port Comment 192.168.2.10 <<----Select----- 80 Both 80 1st-camera Enter required information for the 1st camera and click "Add" Enable Virtual Server Private IP Computer name Private Port Type/Public Port Comment 192.168.2.20 <<----Select----- 82 Both 82 2nd-camera Enter required information for the 2nd camera and click "Add" Current Virtual Server Table: NO. Computer name Private IP Private Port serve Type/Public Port Comment Select 1 192.168.2.10 80 TCP+UDP 80 1st-camera 2 192.168.2.20 82 TCP+UDP 82 2nd-camera Click "Apply"

Step 4:

Configuration for iPhone.

(1) Make sure Internet connection is ok with iPhone and click "Safari"

TW... 上午10:40 SMS 15 Calendar Photos Camera YouTube Stocks Maps Weather Calculator Clock Settings Notes App Store iTunes Cyclia Installer Phone Mail Safari iPod

(2) Enter the IP address of your router's "fixed and public IP address" (check the Step 2 for details)

Note: "/ipcam.asp" is needed

http://61.61.61.1/ipcam.asp This is hypothetical link (yours is different)

If no fixed and public IP address is given by your ISP, you may enter a link like http://my-name.dyndns.org/ipcam.asp (Again, this link is hypothetic)

You could have your own name like http://john.dyndns.org, mary.dyndns.org etc. To apply for a free account, refer to the Appendix “How to apply for a free DNS account in the http://www.dyndns.org “

http://your-name.dyndns.org/ipcam.asp This is hypothetical link (yours is different)

(3) Enter user name & password for the Edimax IP camera. By default, user name is admin and password is 1234

Log into this secure website. Cancel Secure Website Log In admin **** Password will be sent in the clear. 1 2 3 4 5 6 7 8 9 0 - / : ; ( ) $ & @ " #+ = . , ? ! ' _ ABC space return

(4) Let's add the 1^st IP camera. Click first window and Setting.

T1W... 上午 10:52 Untitled 192.168.2.10 1/ipcam... Google EDIMAX 1 2 3 4 Setting Zoom In Help

(5) Click "Add" when finishing the following configuration:

TW... 上午 11:02 Untitled 192.168.2.101/config... Google EDIMAX Back Camera Setting Viewer Setting Camera Setting Add Remove Preview Advanced Camera name Your-preferred_name IP address 61.61.61.1 Port 80 User Name admin Password 1234 This is hypothetic link (yours is different)

(6) Click "Add" when finishing the following configuration for the 2^nd IP camera

TW... 上午 11:02 Untitled 192.168.2.101/config... Google EDIMAX Viewer Setting Camera Setting Back Camera Setting Add Remove Preview Advanced Camera name Your-preferred_name IP address 61.61.61.1 Port 82 User Name admin Password 1234 This is hypothetic link (yours is different)

(7) Configuration is complete. You could see the live video of the 2^nd IP camera.

Chapter V: Appendix

5.1 Specification

Max Resolution: 1280 x 1024 pixels

Sensor: 1.3Mega pixels 1/4" color CMOS sensor

Gain control: Automatic

Exposure: Automatic

White Balance: Automatic

Image (Video Setting)

Image compression: MJPEG/MPEG4/H.264 Image Video

Digital 24-bit Color

Frame rate: 10-15fps@SXGA, XGA, 30fps@QVGA, 20fps@VGA

Video resolution: MJPG&H.264: 1280x1024, 640x480, 320x240

MPEG4: 1024x768, 640x480, 320x240

System Hardware

LAN Connector: One RJ-45 port to connect to 10/100Mbps Ethernet

Wireless: IEEE 802.11b/g/n (*Wireless Model Only)

LED Indicator: Power/Audio/LAN/WLAN for wired and wireless model

Power/Audio/ACT/LAN for POE model

HTTP/Utility

Includes easy-to-find and surveillance utility

Provides Web based Management

View multiple cameras simultaneously on PC surveillance software up to 16 cameras

at a time

Supports 16 additional user accounts for viewing camera

Auto sending Snap Shot or video by E-mail or FTP

Support DDNS and UPnP functions

Supports Windows 2000/XP/Vista/Win7

Firmware Upgradeable

EMI & Safety

FCC, CE class B

5.2 How to apply for a free DNS account in the http://www.dyndns.org

It's very likely your IP address (the Internet location) keeps changing every a couple of hours or every day depending on your ISP's policy. Therefore, as shown in the following figure, you may be assigned with an IP address, "61.61.61.1" hours ago, and now with a new IP address, "72.72.72.1". This means the router at "My-home" can be found at http://61.61.61.1 over the Internet is no longer available after a few hours. To find out the new location (IP address) of the router at My home over the Internet, you need to login to the router, checking the new IP address. However, this is not a workable solution.

To overcome this problem, an Internet service called DDNS is designed to help you trace the log of the changing IP address linking with a web site address (URL). As shown in the following figure, one PC called DDNS server keeps revising the record “your-name.dyndns.org vs 61.61.61.1” in its internal DNS directory. It ends up entering http://your-name.dyndns.org in the iPhone can find out the 2 IP camera at My-home.

Edimax IC-7000PTn - How to apply for a free DNS account in the http://www.dyndns.org - 1

flowchart
graph TD
    A["My home"] --> B["Bed Room"]
    A --> C["Book Room"]
    B --> D["1st IP-Camera"]
    C --> E["2nd IP-Camera"]
    D --> F["Router"]
    E --> F
    F --> G["Internet"]
    G --> H["DDNS server"]
    H --> I["DNS directory"]
    I --> J["61.61.61.1 = your-name.dyndns.org"]
    I --> K["72.72.72.1 = your-name.dyndns.org"]
    L["change to 72.72.72.1"] --> M["2nd IP-Camera"]
    style A fill:#f9f,stroke:#333
    style B fill:#ccf,stroke:#333
    style C fill:#ccf,stroke:#333
    style D fill:#cfc,stroke:#333
    style E fill:#cfc,stroke:#333
    style F fill:#fcc,stroke:#333
    style G fill:#cff,stroke:#333
    style H fill:#ffc,stroke:#333
    style I fill:#ffc,stroke:#333
    style J fill:#cfc,stroke:#333
    style K fill:#cfc,stroke:#333

The following are steps to apply for an account named "your-name.dyndns.org" in the http://www.dyndn.org and how this account is configured into Edimax router.

Note: http://www.dyndn.org is not a branch or affiliate of Edimax. No commercial relation is involved between these 2 companies. The related service offered in the http://www.dyndns.org is for free for a specific time. However, Edimax does not guarantee this service.

First, go to http://www.dyndns.org and apply for an account.

And follow the steps:

Edimax IC-7000PTn - How to apply for a free DNS account in the http://www.dyndns.org - 2

Go to www.dyndn.org

Address

Edimax IC-7000PTn - How to apply for a free DNS account in the http://www.dyndns.org - 3

http://www.dyndns.org

Edimax IC-7000PTn - How to apply for a free DNS account in the http://www.dyndns.org - 4

Edimax IC-7000PTn - How to apply for a free DNS account in the http://www.dyndns.org - 5

Go

Edimax IC-7000PTn - How to apply for a free DNS account in the http://www.dyndns.org - 6

Click "Dynamic DNS"

Edimax IC-7000PTn - How to apply for a free DNS account in the http://www.dyndns.org - 7

Click "Manage Hosts"

Get Started

Manage Hosts

Edimax IC-7000PTn - How to apply for a free DNS account in the http://www.dyndns.org - 8

Click "Add New Host"

Host Services

↑ N

HostnameServiceDetailsLast Updated

Add New Host

Edimax IC-7000PTn - How to apply for a free DNS account in the http://www.dyndns.org - 9

Decide your preferred name. Click "Add to cart"

Hostname:

Your-name

Dyndns.org

Wildcard Status: Disabled [Want Wildcard support?]

Service Type:

Host with IP address [?]

○ WebHop Redirect [?]

○ Offline Hostname [?]

Add To Cart

Edimax IC-7000PTn - How to apply for a free DNS account in the http://www.dyndns.org - 10

Finished. The new DDNS record is traced

HostnameServiceDetailsLast Updated
your-name.dyndns.orgHost61.61.61.1Apr. 06, 2010 10:35 PM

Now, you could locate your home IP camera using

http://your-name.dyndns.org

http://your-name.dyndns.org/ipcam.asp This is hypothetical link (yours is different)

5.3 Troubleshooting

If the IP camera is not working properly, before you contact the dealer of purchase for help, please check the troubleshooting list here, this may help you to solve the problem by yourself and therefore saves your valuable time.

ScenarioPossible Solution
I can not connect to IP cameraa. Please confirm the IP address setting of the computer you're using. If they're not in the same subnet, they will not be able to communicate with each other.b. Please make the IP address you used to connect to the IP camera is correct.c. If you forget the IP address of the IP camera, you will have to reset it to factory default value (which is 192.168.2.3) by pressing ‘reset’ button at the bottom of the IP camera. You'll need a pen or pin to be able to press the reset button. Press and hold reset button for 5 seconds, then try to connect to the IP camera with IP address ‘192.168.2.3’ again.d. Please make sure IP camera is correctly powered (the ‘Power’ LED should be on).e. If you're trying to connect to the IP camera from Internet, please make sure the port that IP camera uses (Video and HTTP port, see section 2.3.1) is not blocked by firewall or other software / hardware.f. Contact dealer of purchase for help, if above solutions do not work.
Image refreshes very slowa. Try a higher frame rate setting, if it's not 30.b. Try a lower resolution.c. If you're connecting this camera from Internet, it could be caused by a slow Internet connection, and it's not a problem caused by camera. However, when the network connection is slow, you should use lower frame rate / resolution.d. Adjust the antenna if you're using wireless connection. The antenna should be perpendicular to the ground to get best reception, and the distance between IP camera and computer / wireless access point should not be too far.e. Try to adjust 'MTU' setting if you're using PPPoE to connect to Internet. Ask your ISP or network administrator for detailed instruction.
IP camera is not respondinga. Is the network cable or wireless connection disconnected? Please check it.b. Unplug the power adapter from wall socket and plug it in again after 10 seconds, then try to connect to the IP camera again.c. If IP camera is correctly powered ('Power' LED is on), but you still can not connect to the camera when you're sure that IP address is correct, please contact dealer of purchase for help).
Image is fuzzyI set the IP camera to send image by Email or FTP, but nothing is receiveda. Adjust the focus ring on the camera until the image becomes clear.b. Use a soft cloth to clean the lens on the camera. You can use cloth with water, but DO NOT use alcohol or other chemical solution.c. Try to adjust brightness setting.d. If there's any light at the place where IP camera is located, switch it on and see if image looks better.a. If the image is send by Email, please make sure it's not blocked by any anti-spam mechanism.b. Please make sure you have enough permission for FTP uploading (You can try this by clicking 'Upload a test file' button).c. Make sure the user name and / or password of SMTP server is correct, if your SMTP server requires authentication (You can try this by click 'Send a test Email' button).d. Please check log, if FTP upload or Email sending is failed, it will be logged, and this may give you some clue on how to solve the problem.e. Change the threshold to a more sensitive setting.
I heard strange sound when I use pan / tilt functiona. Please check if anything jams the camera, remove it.a. If the camera does not respond to you when you're trying to use pan / tilt function, the servo motor inside the camera may dead. Please return the camera to the dealer of purchase and ask for help.
Nothing is heard at the camera side when I use 'Speak to IPCam' functionAn external speaker is required to playback the voice received at computer side.

EDIMAX NETWORKING PEOPLE TOGETHER

EDIMAX Technology Co., Ltd.

www.edimax.com

Table of contents Click a title to access it
Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : Edimax

Model : IC-7000PTn

Category : Security Camera