DVR4-3200 - Voice recorder SWANN - Free user manual and instructions
Find the device manual for free DVR4-3200 SWANN in PDF.
| Type | Digital Voice Recorder |
| Dimensions | 4.5 x 2.5 x 1.0 inches |
| Weight | 3.5 oz (100 g) with batteries |
| Power Source | 2 x AAA batteries (not included) |
| Battery Life | Up to 20 hours continuous recording |
| Recording Format | MP3, WAV |
| Recording Modes | High quality, Standard, Long play |
| Built-in Memory | 8 GB (supports microSD up to 32 GB) |
| Microphone | Built-in electret condenser |
| Speaker | Built-in 0.5W |
| Connection | USB 2.0 for file transfer and charging |
| Display | LCD screen with backlight |
| Controls | Play, Record, Stop, Menu, Volume, Skip |
| Recording Time | Up to 72 hours at lowest quality |
| Playback Modes | Normal, Repeat, A-B Repeat |
| File Management | Folder structure, delete, protect |
| Additional Features | Voice activation, timer recording, password protection |
| Maintenance | Wipe with dry cloth; keep away from moisture |
| Safety | Do not disassemble; use specified batteries only |
| Spare Parts and Repairability | Batteries and USB cable replaceable; no user-serviceable parts inside |
| General Information | Brand: Swann, Model: DVR4-3200, Intended for personal recording |
Frequently Asked Questions - DVR4-3200 SWANN
User questions about DVR4-3200 SWANN
0 question about this device. Answer the ones you know or ask your own.
Ask a new question about this device
Download the instructions for your Voice recorder in PDF format for free! Find your manual DVR4-3200 - SWANN and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. DVR4-3200 by SWANN.
USER MANUAL DVR4-3200 SWANN
960H Digital Video Recorder
4-channel models
Before You Begin
FCC Verification
Note: This equipment has been tested and found to comply with the limits for Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures:
- Reorient or relocate the receiving antenna
- Increase the separation between the equipment and the receiver
- Connect the equipment into an outlet on a circuit different from that to which the receiver is connected
- Consult the dealer or an experienced radio/TV technician for help
These devices comply with part 15 of the FCC Rules. Operation is subject to the following two conditions:
• These devices may not cause harmful interference, and
- These devices must accept any interference received, including interference that may cause undesired operation.
IMPORTANT NOTE:
All jurisdictions have specific laws and regulations relating to the use of cameras. Before using any camera for any purpose, it is the buyer's responsibility to be aware of all applicable laws and regulations that prohibit or limit the use of cameras and to comply with the applicable laws and regulations.
FCC Regulation (for USA): Prohibition against eavesdropping
Except for the operations of law enforcement officers conducted under lawful authority, no person shall use, either directly or indirectly, a device operated pursuant to the provisions of this Part for the purpose of overhearing or recording the private conversations of others unless such use is authorized by all of the parties engaging in the conversation.
WARNING
Modifications not approved by the party responsible for compliance could void user's authority to operate the equipment.
IMPORTANT SAFETY INSTRUCTIONS
- Make sure product is fixed correctly and stable if fastened in place
- Do not operate if wires and terminals are exposed
- Do not cover vents on the side or back of the DVR and allow adequate space for ventilation
DEFAULT PASSWORD INFORMATION
To ensure your privacy, this DVR supports password protection.
The default, all-access username is 'admin', the default password is '12345'.
To ensure your ongoing privacy, we strongly recommend setting a password as soon as possible. Choose something that you'll remember, but that others would be unlikely to guess.
IMPORTANT NOTICE - Do NOT lose or forget your password. To ensure that your DVR has the best security possible, password recovery has been designed to be a complicated and time consuming process. Only a select number of staff at the Swann Technical Support Telephone Helpdesk can assist. Password retrieval can take several days, which means you will NOT be able to access your DVR during this time.
BATTERY INFORMATION
This product contains a removable battery. If you need to replace or dispose of the internal battery.
The battery is located on the mainboard of the DVR. It is a primary lithium CR2032 button cell.
To access, remove and/or replace the battery:
- Ensure the DVR is turned OFF. NEVER open the DVR's case while power is connected.
- Remove the five screws holding the cover on the DVR.
- If replacing the battery, ensure that it is an exact match for size, type and capacity.
- Be sure to safely dispose of the battery. The process for battery disposal/recycling varies from location to location, please check with the relevant local authority for method.
BATTERY SAFETY INSTRUCTIONS
- Do NOT attempt to open, puncture, disassemble or modify the battery in any way.
- Do NOT subject it to sudden shock or heat.
- Do NOT dispose of battery in fire.
Contents
Introduction
Getting Started
Installation Guidelines 6
DVR Front Panel
DVR Rear Panel
Connection Diagram 8
Connecting Additional Devices
Basic Setup
Controlling the DVR 11
Setup Wizard: General 12
Setup Wizard: Email 13
Setup Wizard: System Time
Setup Wizard: Account Configuration 15
Setting up your Smartphone or Tablet 16
Setting up your PC 17
Live View Mode 20
About 960H Widescreen Videos 20
Menu Layout 21
Menu Functions
Overview 23
Display: Camera 24
Display: Output 25
Recording: Encode 26
Recording: Option 27
Recording: Schedule 28
Search: Playback 29
The Playback Interface 30
Specific Incident Backup 31
Search: Backup 31
Search: Event / Log Search 32
Network: General 33
Network: Advanced 34
Network: Advanced: DDNS 35
Network: Advanced: NTP 35
Network: Advanced: Email Settings 36
Network: Advanced: IP Filter 37
Network: Network Status 37
Alarm: Motion 38
Alarm: Motion Detection Configuration 39
Alarm: Motion Detection Notes 40
Alarm: Motion Detection - Action 41
Alarm: Video Loss 41
Alarm: Exception 42
Device: HDD 43
Device: S.M.A.R.T. 43
Device: PTZ 44
System: General 46
System: User 47
System: System Information 48
System: Maintenance 49
6
7
Reference
SwannView Link Windows Interface 51
SwannView Link: Local Settings 52
SwannView Link: Device Settings 53
SwannView Link Mobile Interface 57
Troubleshooting 59
Third Party Hardware 60
Warranty Information 61
1 Helpdesk / Technical Support Details Rear
Chapter
1
Introduction
Getting Started
Congratulations on your purchase of this Swann DVR. You've made a fine choice for keeping a watchful eye over your home or business. Let's take a moment to talk about some of the features this DVR offers, and how to get the most out of them.
Oh my, this is a big manual. How long will this take?
Yes, but you won't have to read all of it - you should be up and running by page 20!
It can take a few hours to connect everything and run through the setup procedure.
The latter half of this manual is for users who want to get the most out of the DVR's capabilities. While the DVR is seriously configurable, the out-of-the-box settings do a great job in 90% of situations, but some users will want to get into the nitty-gritty detail, so that information is presented for those who need it.
The Basic Setup
The default settings of the DVR will cover most basic installation requirements of the DVR.
To get the most out of your hard drive, we've configured the DVR to record only when it detects motion - that way, you won't fill the hard drive with video of nothing happening.
Before installing anything, connect the DVR and cameras and test your system.
We ensure everything is working properly when we ship them out, but sometimes things can be damaged in transport, and occasionally components can fail. Better to find out now, before everything is fixed in place!
Getting the DVR Setup
There are three stages to getting your DVR set up. If you want to use the default settings, you'll only need to complete steps one and two.
1. Connecting the DVR (page 6 to page 9)
This section details what you can connect to the different inputs/outputs of the DVR.
Everyone's setup will vary a little bit - it depends on what cameras came with the DVR (if any) and what device(s) you've already got.
2. Basic DVR Setup
The DVR needs a few things to be set properly before it can do its thing. Follow the instructions from page 12 to page 18 to get everything working.
3. Optional: DVR Menu Functions
The latter part of this manual is a how-to guide on using the menus in the DVR system to perform common and advanced DVR operations.
Take your time to read through this chapter and explore the many capabilities that this Swann DVR can offer you. You will learn how to do things like adjusting the video display settings, searching for recordings, customizing alarm motion settings to something that's more appropriate for your circumstances and lots more.
Note: The out-of-the-box settings really do work well, and we'd only suggest changing them if you've got a really specific plan in mind.
Accessing this DVR from your Smartphone or Tablet
This DVR supports live viewing on your Smartphone or Tablet. We have developed an app called SwannView Link for the Android and iOS platforms. For Android users, please download the app from Google Play. If you have an Apple device, please go to the Apple App Store. As we are continually improving the documentation that we include with our products, you can find the latest user guide for our app at www.swann.com.
Now with extra "H": 960H and what it means
This DVR is compatible and is intended for use with 960H cameras. What does this really mean?
A traditional CCTV camera operates at a resolution of approximately 720 x 480 (NTSC) or 720 x 576 (PAL) pixels* and a 4:3 aspect ratio. By extending the image to a widescreen format, 960H technology increases the horizontal resolution of the camera, thereby increasing the area viewed and the resolution it's viewed at.
In general, 960H is best suited:
• monitoring a wider area than traditional CCTV cameras could cover at the same detail
- being displayed on high-definition widescreen televisions/monitors
• for upgrading from traditional CCTV cameras, while reusing previously installed coaxial cables.
*The resolution is approximate as analog video doesn't really work this way. The resolution listed is the equivalent for a standard pixel matrix.
Installation Guidelines
- Do not expose the DVR to moisture. Water is the arch-enemy of electrical components and also poses a high risk of electric shock.
- Avoid dusty locations. Dust has a tendency to build up inside the DVR case, leading to a high risk of failure or even fire.
- Only install the DVR in a well ventilated space. Like all electronics, the circuitry and hard drive in the DVR produce heat, and this heat needs a way out.
- Do not open the DVR case except to install/swap the hard drive inside. There are no user serviceable parts inside.
- Do not cut or modify any cable for any reason. Doing so
will void your warranty, as well as pose a great risk of fire or electrical shock.
- Do not expose the DVR to sudden bumps or shocks (for example, being dropped). The DVR is as robust as possible, but many of the internal components are quite fragile.
- Remember that the DVR is, in all likelihood, going to be left on 24 hours a day, 7 days a week. Keep this in mind when choosing a location for installation.
- Never open the case whilst the DVR is plugged in, and never turn the DVR on whilst the case is open.
DVR Front Panel

*4-Channel DVR4200 model shown above. The availability of the buttons described here can be different in some models.
| Name Function | ||
| 1 | USB Port | For connecting USB external storage to the DVR for backup, or for applying new firmware. |
| 2 | Play/Pause Button | Opens the playback interface from the live viewing mode. Pauses playback or resumes playback. |
| 3 | Display Button | Toggles between full screen and split-screen views. |
| 4 | Menu Button | Opens the DVR's menu, or goes back one step from a submenu. |
| 5 | Select Button | For selecting menu options in the DVR system. |
| 6 | Directional Pad | For navigating around menus in the DVR system. |
| 7 | Power LED | Power indicator. This LED lights up when the DVR is switched on. |
| 8 | HDD LED | Hard Drive Indicator. This LED blinks rapidly when the hard drive is active. |
DVR Rear Panel

| Name Function | ||
| 1 | AUDIO IN RCA ports for connecting microphones to record audio. | |
| 2 | VIDEO IN | These are your video inputs where you connect your cameras via the BNC connector to display video feed on your TV. The channels are labelled by numbers in the same order as they appear on your DVR's Live View interface. |
| 3 | AUDIO OUT | RCA port for audio output. Used to connect your speaker or headphone. |
| 4 | eSATA | To connect an external hard drive which will act as a live recording drive in the same manner as the installed HDD. |
| 5 | VGA | For connecting a television or PC monitor with a VGA input. |
| 6 | HDMI | The primary video output of the DVR. For the highest possible video output quality, we suggest using this output on a use a monitor/television capable of displaying Full HD 1080p. |
| 7 | LAN | Connect to your home network router using an Ethernet cable to access the Internet. |
| 8 | USB | For connecting the USB mouse and a USB flash drive or hard drive to copy recorded events |
| 9 | PTZ | For connecting RS485 cables to control a PTZ (pan, tilt, zoom) device on the DVR. |
| 10 | Power Input | This is where you connect the supplied DC 12V power adapter to your DVR. |
Connection Diagram

Connect the Video (BNC-connector) and Power cables from the camera to the extension cable then connect the Video cable on the other end of the extension cable to a Video input on the rear of the DVR. Do this for the other cameras in your kit.
Connect the cameras to power using the power splitter then connect the power adapter to a wall outlet.

If you've got a TV or monitor with HDMI In, connect to the HDMI port on the DVR using the HDMI cable. Pay attention to the labels on the back of your HDTV/Monitor indicating the HDMI input number that you'll want to select using your TV remote control to display your DVR screen.
Connecting Additional Devices
The Audio In ports can be used to connect audio devices to the DVR. Obviously, your microphone probably won't look like that one - they're often built into cameras.

The Audio Out port can be used to connect a pair of speakers or headphones.
The PTZ port can be used to connect compatible RS485 devices, such as this Swann PTZ dome.
Chapter
2
Basic Setup
Controlling the DVR
Starting the DVR for the first time:
When you first boot the DVR, it will automatically start the Setup Wizard which will guide you through the various setup options available.
The USB Mouse
The easiest way to operate the DVR is to use the included USB optical mouse - we put together the look and feel of the menu system specifically for mouse-friendly navigation.
The controls are pretty easy to remember - heck, there are only two buttons. It couldn't be simpler.
Left click:
Selects an item or confirms a choice.
Right click:
Opens the menu bar from the live viewing screen.
Returns one "step" from a submenu.
Opens a context menu in some settings screens.
The Scroll Wheel:
Can be used to adjust the values of sliders and scales when highlighted by the mouse.
The Remote Control
The DVR also comes supplied with a remote control unit. Like the USB Mouse, it can be used to perform all the main functions of the DVR. For details of what each button does, see the layout of the remote control below.

Wireless Mice and Bluetooth devices are NOT compatible with the DVR. Please use the USB optical mouse supplied.
Shutting Down & Rebooting
If you want to shut down or reboot the DVR, or simply log out of the user account you're logged in as, access the Shutdown menu which is accessible via the main menu.
To ensure the integrity of your data and recordings, always select Shut Down when powering off the DVR.
Setup Wizard: General
The Setup Wizard will run automatically the first time you start the DVR.
The wizard will guide you through all the settings you need to get your DVR up and working, specifically:
- Choosing your Language
- Setting Video Format and Resolution
- Setting the Date Format and your Time Zone
- Configuring your email account settings so that the DVR can send you alerts and the DVR UID
- Synchronizing the DVR's time with an online server
- Choosing the settings for Daylight Savings Time (DST)
- Changing the DVR's Admin account default password
General Configuration

Language: Choose the language you'd like the menu system to be displayed in.
Video Standard: Choose between NTSC (for the USA, Canada, Mexico, Japan, Korea and some other regions) or PAL (UK, Europe, Australia and some other areas). If this is set incorrectly, images from your cameras will be distorted, black and white, or simply not appear at all.
Resolution: The screen resolution setting for the DVR display. Typically, you'll want to set this to be equal to the native resolution of your monitor/television (check the manufacturer's documentation). For example, if the DVR is connected to your HDTV, you would want to set it to the highest possible setting, 1920 x 1080, to give you the best picture quality.
Time Zone: Choose the time zone you're in. It's really important to select the right time zone if you're using NTP (Network Time Protocol).
Some common time zones: In the USA, EST (Eastern Standard Time) is GMT -5:00, where PST (Pacific Standard Time) is GMT -8:00. The UK is GMT +0:00, and the East Coast of Australia is GMT +10:00.
Menu Date Format: How you'd like the date to be displayed. Choose whichever format that's standard in your region.
UID: This is the DVR's Unique Identifier number which you will use later to connect your PC or SmartPhone to the DVR using Swann's Peer to Peer technology.
If you need to change any of these settings later, you can find these options here: Main Menu -> System -> General
Setup Wizard: Email
If you want the DVR to send email alerts as alarm events are detected, then you'll need to configure an outgoing email server for the DVR to use, and choose an email address for it to send to.
We recommend creating an account with Gmail (www.gmail.com) specifically for the DVR.
These instructions assume you're using a GMail account. If you're using a different email, see "Network: Advanced: Email Settings" on page 36 for details.
Enable SSL or TLS: Enable.
SMTP Server: The SMTP address of your email server. There are 3 preset options to select from: smtp.gmail.com, smtp.live.com or smtp.mail.yahoo.com
Other: Allows for custom definition of an outgoing email server. See "Network: Advanced: Email
Settings" on page 36 if you want to use an email server other than ones provided. Recommended for advanced users ONLY.

SMTP Port: The SMTP port of your email server. Gmail's is 465 (this value will self-populate)
Sender Address: The email address you want your DVR to send alerts from. For example, your_email@gmail.com
Sender Password: The password of your sending email address.
Recipient Address: Enter an email address for the DVR to send alerts to (usually your personal email address).
Attach Picture: When selected, the DVR will attach a still image to better illustrate what has caused the alarm/alert state.
Interval: The minimum amount of time that must elapse after the DVR sends an email alert before it can be triggered again.
Test: To check if you've set up email alerts properly, click the Test button. If your connection and email details are ok, you will see a message on the DVR screen confirming the email was sent successfully. After a short delay, you will also receive an e-mail in your inbox (Recipient's Address) informing you that email alerts from the DVR has been set up. If the test is unsuccessful, please check your sender's address/password and recipient's address(es) and try again.
UID: This is the DVR's Unique IDentifier number. We will use this UID to configure the SwannView Link app & software and connect to your DVR. You can click the Send UID button to receive an email containing the UID (that's assuming your email details are configured).
Send UID: When you've finished testing your email, click the Send UID button to send the DVR UID to your email address (Recipient's Address) so you can use it for access from SwannView Link on your PC etc.

Your DVR does not send out email alerts immediately when events occur. The frequency of email alerts depends on the "Interval" setting you specify here.
Setup Wizard: System Time
NTP

NTP stands for "Network Time Protocol". It's a way for the DVR to connect to the Internet and automatically update and maintain accurate time. There's no requirement to use NTP, but it's easy to setup and free to use, so there's really no reason not to.
NTP Server: The default server used to obtain accurate time.
NTP Port: The default is 123. You should only change this if you're using a different NTP server, and you know they use a different port. If you're using pool.ntp.org, ensure the port is 123.
Sync: Triggers the DVR to automatically synchronize its internal clock with the time server immediately. If your DVR is connected to the Internet, the DVR will update the time immediately.
System Time: The DVR's current date and time.
DST Configuration
If your time zone observes daylight saving time and you want your DVR's clock to be updated automatically when daylight saving time starts and ends, make sure the Enable checkbox is selected. You can configure when daylight saving time starts and ends, for example - 2 a.m. on the first Sunday of a particular month.

Note: Make sure your time offset is set correctly or both your DVR's normal time and DST time may be out.
Offset: The amount by which the time changes during DST. For the vast majority of locations, the offset is one hour, but exceptions to this rule exist.
Start Time / End Time: When DST begins and ends in your locale.
Setup Wizard: Account Configuration
Account Configuration
Here you can change the default password of the Admin account. For on-going protection against unauthorized access, we strongly suggest setting a new password for your Admin account.
User Name: The DVR's default administration account, which is always called "Admin". You can't change the Admin user name.
Password: The password you'd like to be associated with the Admin account. A password can be between 1 and 8 characters in length, and consists of numbers only (no letters or symbols). The default password that's masked on screen is "12345".
Confirm Password: Re-enter the password to ensure accuracy.
Level: This field is greyed out because the Admin

account always has the highest level of access. There are two additional access levels available - Guest and Operator.
Enable Password: Select this if you want to be prompted for the user account's password when accessing the main menu. This adds an extra layer of authentication on your DVR
Display wizard when booting up (checkbox): Select this if you want the DVR to automatically run the configuration wizard when
it boots up. You can also run the wizard at any time by clicking the icon on the DVR menu bar.
Default Password Information
To ensure your privacy, this DVR supports password protection.
The default, all-access username is "admin". If the DVR asks you to log in before you've set a password, enter admin as your username and leave the password blank. This will give you access to all areas of the DVR.
The password function is disabled by default. However, if you're asked for a password, the default is "12345".
To ensure your ongoing privacy, we strongly recommend setting a password as soon as possible. Choose something that you'll remember, but that others would be unlikely to guess.
If you do manage to lock yourself out of the DVR, you'll need to contact us at the Swann Technical Support Telephone Helpdesk - the number is on the back cover.
Finishing the Setup Wizard
When you click Finish, the DVR will update and save your settings. It may reboot while doing so.
Setting up your Smartphone or Tablet
Have a Smartphone or Tablet?
Then head to the respective Apple App Store or Google Play, download the SwannView Link app (or SwannView Link HD for tablets) for free and turn your iOS or Android device into a monitoring centre for your DVR. Have the peace of mind that you can monitor your home at any time from any place. With "SwannLink" Peer to Peer technology, connecting your smartphone, tablet or PC to your DVR is so easy - there's practically no need to fiddle around with complicated network configuration. Best of all, it only takes minutes to get it all up and running!
Important Note: As the SwannView Link app is constantly under development to improve your user experience, the following screens may differ slightly from the actual app.
Configuring the SwannView Link App
After you have downloaded and installed SwannView Link (HD) on your smartphone or tablet, locate the app and tap the icon to run. Take your smartphone/tablet to your DVR and follow the instructions below.
-
In the Live View screen, tap Menu at the top left and then tap Device
-
In the Devices menu, tap + to add a new Device as shown below.


- On the DVR you will see a sticker with a QR Code and your UID number (the sticker will be on the top or bottom of the DVR case depending on which DVR model you have).
On the app, tap the QR Code button and use your smartphone's camera to scan the QR sticker on the DVR. This automatically populates the UID box with the DVR's UID. Enter a Device Name (anything you like), the username and password for your DVR as shown below and tap to save your settings.

- Next, tap Start Preview to automatically check the number of channels and then you will see your cameras on screen and that's it, you're connected!

Need more details?
Full explanation of the SwannView Link's app interface is detailed in the Reference chapter from page 57 to page 58.
Setting up your PC
SwannView Link Software
Your DVR comes with powerful remote access and interface software, called SwannView Link. You can setup and configure almost all aspects of the DVR from the SwannView Link interface.
The SwannView Link software will allow you to:
• view images from your DVR in real-time,
- playback recorded footage,
• copy footage to your local PC and
- adjust settings and configure the DVR.
In fact, the SwannView Link software is so powerful, you don't even need to connect a monitor to the DVR if there's a computer on the local network that you're running SwannView Link on.
For quick and easy configuration of the DVR's settings, recording quality and schedule, we suggest using the remote interface in SwannView Link.
How to install SwannView Link:
- Insert the included CD into your computer.
- Click the SwannView Link PC Monitoring Software button from the Software Installation Menu to begin installation.
- You may be asked by UAC (User Account Control) to allow SwannView Link to "make changes" to your system. Select Allow or Continue.
- You'll see an installation wizard. Simply follow the prompts to install the software.
- Once the SwannView Link software is installed, it should automatically detect your DVR on your network.
Minimum PC Requirements:
2.0GHz or faster CPU (Dual-core recommended)
1GB or more RAM (2GB recommended)
10/100Mbps Network (1000Mbps recommended)
Internet connection (512kbps+ recommended)
1024x768 resolution (1280x720 recommended)
Supported Operating Systems
Microsoft Windows XP, Microsoft Windows Vista, Microsoft Windows 7 and Microsoft Windows 8
NOTE: Windows XP, Windows Vista, Windows 7 and Windows 8 are registered trademarks of Microsoft Corporation.
Got a Mac?
Check out www.swann.com/myDVRmac
for the latest Mac-based remote access software.






Setting up your PC
Logging on to SwannView Link
- To connect from your PC to your DVR, make sure your DVR is on and all connections are ok.
- On your PC, open the email that your DVR sent when you were setting up your email account during the Setup Wizard which should look something like this image and locate the the UID:


- Copy the UID (highlight the text - right click with your mouse and click "Copy"). In this example, start with the X and end with the T then paste it into the field marked UID as shown above right.
- Then, enter your Username (the default of admin is already entered) and Password (default is 12345), then click Login. After a few seconds, you will see your cameras live on your PC.

Main Stream or SubStream?
Each video feed of the DVR is comprised of two components, the Main Stream and the SubStream. Main Stream is the higher quality of the two streams, and is what you'll see on the DVR itself or via a local network. Substream is a fraction of the Main Stream, and what you'll see over the Internet or via a mobile device. Typically, the Substream will be of significantly lower quality and bitrate than the Main Stream.
SwannView Link Interface
After you successful log on to SwannView Link, you will see the following screen:


Need more details?
Full explanation of the SwannView Link's software interface and remote configuration options are detailed in the Reference chapter from page 51 to page 56. SwannView Link's software interface is functionally very similar to the DVR's menu system, and you'll find more detailed information about all menu options and settings there.
Live View Mode
The Live View Screen
Live View is the default display mode for the DVR. Each camera that's connected to the DVR will be displayed here. You can check the status and operate your DVR and cameras with the icons and menus on the Live View screen.

Status Icons
Information on the DVR and camera status is displayed as icons on the Live View screen. Each camera will show its own status icons. Icons are there to give you a quick snippet of what's going on with your cameras - whether your camera has detected motion or even when your camera is having a connectivity issue. The following is a guide of what each icon represents:

The camera icon indicates that this camera is currently recording. This icon will be the same whether the recording was scheduled, initiated manually or triggered by motion (though the motion icon will also be present if there's motion detected).

The motion icon indicates that the DVR is detecting motion coming from this camera. It doesn't necessarily mean it's recording (the camera icon will be there, too, if that's the case!).

Video Loss indicates that the channel displaying this has lost the feed from its camera. This may be caused by a disconnected/damaged cable, the camera may have lost power, the camera may have been de-registered from the channel or the video standard might be wrong (PAL/NTSC).

If you see this icon on-screen (it'll be lurking in the lower right corner by default) it indicates that something has gone wrong. Click the icon to access the Event Log where you'll get more information about exactly what has gone wrong.
Live View Mode
Menu Bar
To open, right click with the mouse on the Live View screen.

Opens the main menu.

Runs the initial startup wizard.

A Single Camera View: Shows images from one camera in full-screen.
B Four-Camera (2 x 2) View: Divides the screen into four viewing windows.
C Next Camera(s): Displays the next set of channel(s) in the current screen mode
D Start/Stop Tour: Starts/Stops auto-channel sequencing at every specific interval (called "Dwell Time")
E PTZ Control: Opens the PTZ control window.
F Digital Zoom: Displays the selected video channel in full screen and shows the Digital Zoom control panel.
G PIP: Picture-in-picture. Allows you to view two channels at once, with one full screen and the other as a small overlay.
H Manual Record: Displays the Manual Record screen.
1 Playback: Displays the Search: Playback menu.
Audio On/Off: Enables or disables the audio function of the DVR.
About 960H Widescreen Videos

other
| Video Type | Aspect Ratio | Dimension | |------------|--------------|---------| | Standard Definition Composite Video | 4:3 | 720 | | Standard Definition Composite Video | 4:3 | 480 (NTSC) | | Standard Definition Composite Video | 4:3 | 576 (PAL) | | Widescreen Video | 16:9 | 960 | | Widescreen Video | 16:9 | 480 (NTSC) |960H is the term used for a composite video signal which offers additional horizontal lines of resolution. The additional horizontal space creates a significantly larger and sharper image, and also allows for higher dynamic range.
If you connect traditional CCTV cameras to the DVR, then the DVR will automatically upscale the image to make use of all the available screen. This will allow for higher quality videos than would otherwise be vailable - particularly for 700TVL+ cameras - but will warp the image to appear a little wider than it should be.
If you do wind up with a recording at the wrong aspect ratio, this isn't a disaster. You'll still be able to clearly see details and identify individuals, up to the limits imposed by the camera itself.
The correct aspect ratio can easily be applied using a media player such as VLC. Just backup your footage as an AVI, play it back on a PC and select the appropriate aspect ratio (16:9 for 960H cameras and 4:3 for standard CCTV).
Menu Layout

flowchart
graph TD
A["Menu Bar"] --> B["Display"]
A --> C["Recording"]
A --> D["Search"]
A --> E["Network"]
A --> F["Alarm"]
A --> G["Device"]
A --> H["System"]
A --> I["Shut Down"]
B --> B1["Camera"]
B --> B2["Output"]
C --> C1["Encode"]
C --> C2["Option"]
C --> C3["Schedule"]
D --> D1["Playback"]
D --> D2["Backup"]
D --> D3["Event/Log"]
E --> E1["General"]
E --> E2["Advanced"]
E --> E3["Status"]
F --> F1["Motion"]
F --> F2["Video Loss"]
F --> F3["Exceptions"]
G --> G1["HDD"]
G --> G2["S.M.A.R.T"]
G --> G3["PTZ"]
H --> H1["General"]
H --> H2["User"]
H --> H3["Information"]
H --> H4["Maintenance"]
I --> I1["Lock"]
I --> I2["Shutdown"]
I --> I3["Reboot"]
B1 --> B2
B2 --> B3["DDNS"]
B3 --> B4["Email Settings"]
B4 --> B5["NTP"]
B5 --> B6["IP Filter"]
C1 --> C2
C2 --> C3
C3 --> C4
Chapter
3
Menu Functions
Overview
This chapter consists of a guide to performing common and advanced functions through the menus in the DVR system; a How To... guide. We recommend that you read the previous chapter, Chapter 2 - Basic Setup, to complete the Setup Wizard to get your DVR up and working and become familiar with operating the DVR in Live View mode before continuing with this chapter.
By Default...
- The DVR has motion recording enabled on every channel, configured to operate at an average level of sensitivity.
- To be a little more likely to record an border-line motion event than not (we think it's better to get a false trigger than miss an event).
- To record video each time it detects a motion event, but not notify you via email (all events will be listed in the log).
To alter the DVR's default behavior, you'll need to change some settings in the menus.
You can do this by using either the DVR's built-in interface or SwannView Link PC software (for details, see "SwannView Link: Device Settings" on page 53.
Quick Reference
Some of the more common reasons to have a look in this chapter include:
Altering the Recording Schedule
The recording schedule is one of the most important things to get right when configuring the DVR. More information about the schedule can be found at:
- "Recording: Schedule" on page 28.
Searching for Recordings
There are number of ways to search for recordings. You can search by channel, recording type, time period or event. To learn more, look at:
- "Search: Playback" on page 29.
- "Search: Event / Log Search" on page 32.
Configuring the Auto-Email Functions
If you want the DVR to notify you via email when it detects a motion event, then you'll need to configure:
• "Network: Advanced: Email Settings" on page 36.
- "Alarm: Motion Detection - Action" on page 41.
Altering the Motion Detection Settings
If you want to change the way the DVR handles motion, then you'll need to look at:
• "Alarm: Motion" on page 38.
- "Alarm: Motion Detection Configuration" on page 39.
Controlling a PTZ Device
If you got your PTZ camera as part of a kit with the DVR, then there shouldn't be much configuration required. Follow the instructions in your Swann PTZ Camera manual.
If the PTZ camera did not come with the DVR, then you can find information about configuring settings for a PTZ Camera at:
• "Device: PTZ" on page 44.
Display: Camera

The Display: Camera menu is where you can make adjustments to how the DVR displays the feed coming from your cameras.
You can adjust aspects of each channel/camera, such as:
- the camera's name
- what information will be displayed on-screen, and where this information will be displayed
- whether information such as the date will be recorded directly onto your videos
- any areas of the video you want "masked" - that is, left blank
Camera No.: Choose the channel you want to edit here. The Camera No is the same thing as the number written on the rear panel next to the BNC socket used to connect the camera.
Camera Name: Enter a name for the camera you've selected. By default, all channels are named as the Camera No. field, but this can be set to anything you'd like up to 16 characters.
Display Camera Name: When checked, the name you've entered for the camera/channel will be displayed on-screen as an overlay.
Record Date: When checked, the date (as displayed) will be recorded directly on to your videos. This can be useful, as it creates an inseparable record of exactly when the footage was captured.
OSD Display Position: Gives you access to a screen where you can easily set the exact positions of any overlaid text, such as the camera name and the date and time.
Simply select any item you want to move (such as the Channel Name and/or the Date and Time) and click and drag it to the position you'd like it to be.
To exit the OSD Display Position screen, press the right click button. A context menu will appear with two options: Save and Exit. To exit without saving, simply choose Exit. If you want to save your changes, choose Save first.
Image Settings: Gives you access to image adjustment tools, allowing you to adjust the way the DVR interprets and displays video images. See opposite for more information.

The Image Settings you choose will affect your recorded footage. Rather than applying the changes after the video has been processed (like many older DVRs) the Image Settings affect how the DVR decodes the video it is receiving from the cameras.

Brightness: Changes how light the image appears to be. However, it can't make the camera see further in the dark, or increase the clarity of an ill-lit image.
Contrast: Increases the difference between the blackest black and the whitest white in the image. Useful if sections of the image "grey out" but setting the contrast too high will degrade image quality.
Saturation: Alters how much color is displayed in the image. The higher the saturation, the more bright and vivid colors will appear to be. Again, setting this too high can degrade image quality.
Hue: Changes the color mix of the image (this can have very dramatic results). It's somewhat like moving through a rainbow.
Remember: Your image settings will affect your recordings!
You can use the Image Settings to help fine-tune your Motion Detection sensitivity. At night, your camera's images may seem to flicker slightly, or to have increased "noise". In video, "noise" is random fluctuations of pixels, a little like an old television that is not set to a station, often called "static".
By tweaking the Brightness and the Contrast you can eliminate much of this video noise, increasing the quality of your images and the accuracy of the Motion Detection.
Mask: When checked, allows you to create, place and shape a "privacy mask" which obscures part of the image on the associated channel.
Display: Output

The Display: Output menu is where you can control how the DVR is going to deliver an image to your television, screen or monitor. You'll be able to adjust items such as:
• screen resolution and position on your monitor
- the audio output
• the appearance of the menus
• the auto-sequence dwell time
• the sensitivity of the USB mouse
Resolution: The number of "little dots" that make up an image. This should be set as high as possible, but equal to or lower than the maximum resolution your screen/monitor can display. Things change a little depending on what kind of monitor you're using, and how it's connected.
The DVR has many formats available, in four different aspect ratios:
Standard (4:3) - 1024 x 768
Standard (5:4) - 1280 x 1024, or 1400 x 1050
Widescreen (16:10) -1280 x 800, 1440 x 900, or 1680 x 1050
Widescreen (16:9) - 1280 x 720 (720p), 1600 x 900, or 1920 x 1080 (1080p)
Note: 1280 x 1024 and 1400 x 1050 are considered standard aspect ratios, and are best displayed on monitors with anamorphic pixels. "Anamorphic" is a fancy term for "not quite square".
Most televisions are 16:9 widescreen. Computer monitors are still commonly produced in multiple aspect ratios, with 4:3, 16:9 and 16:10 being the most popular aspects.
Standard Monitor via VGA: Use one of the 4:3 formats to correctly align the DVR's output on your screen. Using a widescreen format will "stretch" the image vertically.
Widescreen Monitor via VGA: If possible, use the widescreen (16:9 or 16:10) format. If your monitor can't display those resolutions, you might need to enable letter-boxing on your monitor and use a 4:3 format.
PC Monitor via HDMI: Choose a format appropriate for your monitor. If it's a widescreen, use a widescreen format. Set to the highest option that is equal to or less than the screen's maximum resolution.
Widescreen Plasma/LCD HDTV via HDMI: The resolution should be set to the maximum your television can process not display. Typically, this will be 1080p, as even screens which don't have that many pixels can still display the image, just with less detail. Check your television's documentation to learn this value. If your television can't display 1080p, then use 720p instead.
Transparency: You can set the DVR's menus to be partially transparent (see-though) - in case you need to keep an eye on things while adjusting settings. The best way to set this is to simply experiment over time and see what works for you.
Mouse Sensitivity: How sensitive the mouse will be. On lowest, large and dramatic arm movements are required to move the mouse but a few inches onscreen. At the other end of the spectrum, a tiny bump or knock can send the cursor from one side of the screen to the other. Try somewhere around the lower end for starters, and then increase it little by little if it's moving too slowly.
Dwell Time: How long channels will be displayed when using auto-sequence mode.
Audio: Whether the DVR will output an audio signal. When checked, the DVR will output audio to a compatible device (via the HDMI [see note below] or the RCA Audio Output). When unchecked, the DVR will not output an audio signal at all.

Audio via HDMI
If you want to send audio via the HDMI, then you'll need to use a standard HD resolution. This is due to the way that HDMI embeds audio information around video information.
The two resolutions that will stream audio correctly are 720p (1280 x 720) and 1080p (1920 x 1080).
Selecting any other resolution will prevent audio being sent via HDMI.
Border Adjustment: Changes the size and position of the DVR's images on the screen. Altering the border size can be useful if you've got parts of the DVR's image extending beyond the part of the screen you can see.
The border adjustment is more likely to be required for older, CRT computer monitors connected via the VGA output. HDMI should (in theory) automatically adjust the DVR's image to perfectly fit your screen.
Recording: Encode

The Recording: Encode menu allows you to alter and customize how the DVR records footage and "encodes" the files.
"Encoding" is a term which refers to the compression algorithm (a fancy computer term for "make the file smaller while retaining visual quality") used by the DVR.
You can choose and alter:
• the resolution (per channel),
- the frame rate (how many images per second the DVR records)
- the data-rate of each video stream. The higher the data rate, the "better" your images will look, but the more space they'll require on your HDD
Camera No.: The camera feed you want to alter the settings for. These are numbered sequentially, and correspond to the BNC video inputs labelled on the rear of the DVR.
Encoding Parameters (advanced user option): Whether you're editing the parameters for the mainstream or the substream.
- Main Stream: The main stream is the video feed that the DVR will record and display. This is the higher-quality stream.
- Sub stream: The sub stream is the video stream that the DVR will send to remote devices via a network or the Internet. It is the lower-quality stream as a reduction in video size makes it easier to send over a network.
Record Audio: Choose whether the channel you've selected will record audio or not. If you don't have any audio devices connected, it's a good idea to disable audio, as it will save some space on your HDD.
Resolution: How many "little dots" are going to make up your image. There are two options available:
960H: Encode recordings at (PAL: 960 x 576, NTSC: 960 x 480) resolution. As noted in "About 960H Widescreen Videos" on page 20, a standard CCTV camera's image will be slightly stretched horizontally when recorded by the DVR.
D1: About the same resolution as a DVD (704 x 480 for NTSC, or 704 x 576 for PAL). This is the default resolution for all channels, and we suggest leaving this setting well alone.
Frame Rate: The number of frames per second (fps) that the DVR will record. The default (and maximum) is referred to as "real-time" and is 30fps (NTSC) or 25fps (PAL).
Reducing the number of frames per second will not save hard drive space but potentially will improve the data-rate per frame (depending how you set the bitrate - see the next point).
Remember that your FPS count is the same as saying "take X photographs per second" (where X is your FPS setting).
5fps doesn't sound like much, but it's still five individual photographs per second. If maintaining image clarity while reducing HDD consumption is your priority, it makes sense to lower the frame rate.
Max. BitRate(Kbps): The actual amount of data that the DVR uses to record video. The higher the bitrate, the more space each recording takes up on the hard disk. Generally speaking, recordings encoded at higher bitrates will be of better quality, especially when recording movement.
The main stream uses a variable bitrate to record video - the more movement occurs in the video, the higher the bitrate will have to be. When there's little movement in view, the DVR will automatically reduce the bitrate to conserve HDD space.
If the amount of movement in a recording would require a higher bitrate to accurately record than what you've selected as the maximum, the DVR will attempt to preserve as much of the quality as possible by applying compression to the image. This compression will take the form of irregular, fuzzy blocks over segments or the entire image. If you encounter this, it indicates that you might need to increase the overall bitrate.
If you've set a high bitrate but a low frame rate, the DVR will still use all the data it can, resulting in potentially higher quality per frame than at higher frame rates.
The sub stream uses a constant bitrate. This makes the video easier to stream over a network or the Internet.
Note: Both the main stream and the sub stream are always operating - in fact, the sub stream forms part of the main stream. The options will affect the output quality of each stream, but won't change which one is being used in different circumstances.
Recording: Option

The Recording: Option menu lets you change some aspects of how the DVR will record footage, such as:
• whether the DVR will record a short video before events take place,
• how long after events take place the DVR will continue to record for,
- how the DVR will store and divide long recordings into "packs" and
- whether the DVR will record over old footage to make room for new events.
Overwrite: When enabled, the DVR will record over the files already stored on the hard drive. The DVR will always record over the oldest files on your hard drive first.
Using the overwrite option is advisable, as the DVR will always be able to record events as they happen. However, it does mean that you'll need to get important events off the HDD before they're overwritten.
Pre-Record: While Pre-Record is enabled, the DVR will record a few seconds before an event occurs. It's a little like making the DVR psychic (but not really - it's actually just caching a few seconds of video which it adds to event recordings as they occur). If you're using Motion Detection (recommended) based recording as your primary recording method(s), then it's a really good idea to use Pre-Record - sometimes, if an event is fast enough, it might have left view before the DVR can trigger a recording. With Pre-Record, there's almost no chance you'll miss it.
Post-Record: How long after an event occurs that the DVR will continue to record. It can be very useful - for example, if an intruder or potential target triggers the motion detection but pauses in view; having post-record enabled will get a much better look at them. 30 seconds is the recommended length for the post-record setting, but it can be set higher (the options are 1, 2, 5 or 10 minutes) depending on your unique circumstances.
Pack Duration: Pack Duration is a measurement of how long the DVR will record for before splitting the output file into discrete units. "Packs" are something like the chapter numbers on a DVD - though the video is broken up into separate units, it will still play through as one continuous movie (unless interrupted by the schedule or motion detection turning the recording on or off). If you don't want to worry about setting Pack Durations, you can leave it on the default value; it will make little difference to the day-to-day running of the DVR.
Recording: Schedule

This example image shows a recording schedule defined for a channel with the DVR's recording modes. If the DVR was started with this shedule, the selected channel (in this case Channel 1) would:
• Not record anything from midnight (00:00) to 6am (06:00).
- Record based on Motion from 6am (06:00) until 6pm (18:00).
- Record constantly from 6pm (18:00) until midnight (00:00).
The Recording: Schedule menu enables you to specify when the DVR records video and under what modes for each channel. The schedule presented on-screen applies to one channel only over one whole week. There is a 24-hour timeline for each day of the week. Each square in the timeline represents an hour in the 24-hour period.
Use the Copy To functions to quickly assign identical schedule layouts to multiple days/channels at once.
Be careful when programming your schedule. It's one of the most important aspects of setting up your DVR, and if it's wrong in any way, it could lead to disastrous complications later.
Copy To (Channel): Located at the base of the screen, with Default on one side and Apply on the other. This allows you to copy the schedule from the channel you're editing to another channel or channels.
Recording Modes

By default, all channels are armed to use Motion Detection as their recording mode.
There are three types of recording to choose from.
Normal (Blue): The DVR will constantly record for any period. You won't miss anything, but constant recording will fill your hard drive very quickly. (The DVR does record the equivalent of a DVD film every two hours on every channel, so that's rather a lot of data!) Typically, we suggest Motion as a better recording mode for most users.
Motion (Green): The recommended recording setting for most applications. The DVR will only record when it detects
something moving in front of a camera, and will then only record footage from the camera(s) that do detect motion unless you alter your Action settings (see "Alarm: Motion" on page 38) to include other channels.
Before setting any of your schedule to Motion, ensure that Motion Detection is properly configured for the channel(s) you want to associate with it. The Action Options for Motion Detection can affect the way the recording schedule works. Any adjustments in the Alarm -> Action menus will change the DVR's behavior, even if it is set to Motion Recording mode (see "Alarm: Motion Detection - Action" on page 41.)
None (White): As the name suggests, the DVR will not record anything.
To define a schedule:
- Select the channel that you want to edit.
- To set a recording mode for a specific time and day, click the corresponding square(s) in the timeline until the colour changes to your desired recording mode - Blue (Normal recording), Green (Motion recording) and White (Not recording).
- A quick way to set a specific type of recording over a large period of time is by clicking on the desired recording mode below the timeline then clicking and dragging the mouse over the squares corresponding to your desired days and times.

To disable the recording schedule for a particular channel, simply uncheck the Enable box.
Search: Playback

To initiate playback:
- Select the channel you'd like to playback. Note: The DVR can playback up to 4 channels at a time.
- From the Video Type menu, select the type(s) of video you'd like to playback. The options are Manual, Schedule, Motion and All.
• Set your Start Date/Time and your End Date/Time. - If you want to see a graphical representation of when recordings were made and what recording mode triggered them, choose Details.
- Select Search.
- Choose which event(s) you want to play back, and up to four cameras you'd like to view the video(s) from.
• To initiate playback, select Play.
Performance and Playback
When playing back multiple channels at once, you may notice that they're not quite "in sync" and, in extreme cases, may be displayed in near real-time (instead of real-time).
Why?
The DVR only has so much processing power, and we've configured it so that it has more resources dedicated to recording than to playback.
While you're playing back footage, the DVR continues to monitor and record normally. Recording from up to four channels simultaneously is so resource intensive that playback performance may be sacrificed to ensure ongoing reliable recording.
The Video Search Details
Recordings for the selected day are shown per channel by time.
Each recording is color-coded to match the recording mode the DVR was using at the time.

The Playback Interface

The Playback interface is quite similar to a computer's media player, or to the on-screen display of a DVD/Blu-ray player. Most of the controls are quite straight forward, and operate in the same way as a standard media player.
Current Position: A basic progress meter. You can click to move the current position icon to quickly scan through video events.
Volume Control: Alters the output volume of playback.
Cut & Copy: Used to mark a Start Point and End Point for incident backups. Press Cut to mark an start point, and press Cut again to mark an end point. Press Copy to make a backup of everything in between. For more detail of the Cut & Copy commands, see "Specific Incident Backup" on page 31 for more details.
Rewind: Reverses the footage.
Play: Plays footage at normal speed.
Pause / Step: Pauses playback but retains still images on-screen. Subsequent presses will move a single frame forward in the video. This will usually be 1/30th (NTSC) or 1/25th (PAL) of a second.
Fast-Forward: Speeds up playback.
Slow: Plays back footage at reduced speed. Press multiple times to further reduce the speed: 1/2 speed, 1/4 speed, 1/8th speed, 1/16th speed and so on.
Recording Type: Whether the video being played back was recorded under normal recording (blue) or based on motion event (red).
Hide Console: Maximizes the area on-screen for playing back your footage by hiding the on-screen controls.
Exit Playback: Leaves the playback interface and returns to the live viewing mode.
Playback Limitations
While you're playing back footage, the DVR continues to monitor and record normally.
Simultaneously recording and playing back footage from many channels at once is extremely resource intensive. If the DVR is simultaneously recording/monitoring multiple channels and playing back multiple channels at once, there may be a slight reduction in performance from realtime to near-realtime.
Specific Incident Backup

Say you've got an hour of video recorded as a single pack, and the interesting bit is from 33:12 to 33:26. We're sure you don't want to copy and convert the whole hour for those precious 14 seconds. So, there is a better way!
Shown above is the Playback Control Interface, explained in more detail in the previous page (see "The Playback Interface" on page 30). We're going to discuss the functions of two buttons only, the Cut button and the Copy button.
Note: These don't work quite the same way they do on a computer! Those familiar with a video editor might recognize the function of the Cut button as being similar to the Mark In/Out function.
Cut: Marks the Start Point and End Point for a specific incident backup.
Press once to mark an start point at the current position marker. Typically, this will be immediately before the incident you want to copy.
Let the video play past the incident you want to save, and then press Cut again to mark the end point.
Pressing Cut a third time will erase the previous start/end points and begin the process again.
Copy: Initiates a backup of everything between the start and end points. You'll see the backup dialog shown above, but with only a single video listed.
If there is no start point marked, the backup will commence from the start of the timeline. If no end point is marked, the backup will continue until the end of the current timeline.
Search: Backup

To backup footage:
- Connect a USB flash drive or a USB hard drive (HDD) to the USB Port on front of the DVR.
- Choose the camera(s) you want to backup footage from.
- From the Video Type menu, select the type(s) of video you want to backup.
• Set your Start Time and End Time. - Select Backup.
Note: The USB Ports are used for backing up footage, or connecting the USB mouse. If you want to use an external drive to record live video footage, use the eSATA port on the rear of the DVR.
The Backup File List
Displays a list of all the video events between the start and end times you've selected. All the ticked files will be part of the backup. Click Next to continue.
Refresh: Looks for devices to which footage can be backed up to. This will include USB flash drives or hard drives connected to the front USB port.
AVI Format File: When checked, the DVR will transcode the footage into a file format that can be played back on a computer.
About transcoding to AVI:
Don't be put off by the complex word - transcoding is just a shortening of "translating code". Transcoding, while a straight-forward process, is very processor intensive. You may notice significant slow-down (or apparent non-responsiveness) on your DVR while the transcoding takes place.

Search: Backup

bar
| Status | Value | | -------------- | ----- | | Exporting(6/7/16): | 82% | | Total Progress: | 0% |
While the backup process is executed, the DVR will display a pair of progress meters. The top one indicates the progress of the current video event, the lower one shows the overall progress.
To end the backup process before it's complete, choose Cancel. Some or all of the incidents you selected will not have been copied. While backing up, particularly when transcoding to AVI, the DVR might take a few moments to register that you've selected Cancel.
Note that, while the backup is in progress the DVR will be inoperable locally. It will continue recording and monitoring, but won't respond to the mouse being moved or buttons being pressed (at least, not quickly - cut it some slack, it's working really, really hard).
You'll still be able to access the DVR remotely via the SwannView Link software. However, due to the system requirements of backing up footage, the DVR's performance might be reduced.
Backing up footage can be a slow process - doubly so when transcoding to AVI. If you're backing up more than a few minutes footage at a time, you've got time to make a cup of coffee, maybe call a friend or catch up on some TV. Seriously, it can take a while - talk to any video editor about transcoding and they'll tell you it takes a long time.
Search: Event / Log Search

The Event Search menu shows you recordings that were triggered by the DVR detecting motion.
Typically, the majority of recordings based upon "Events" are likely to be recordings triggered by the DVR's motion detection feature.
The search function operates in the same way as the main playback search: the only difference is you'll select an Event Type rather than a Video Type.
The Log Search displays a list of events, presented in chronological order: the most recent events will be at the end of the list.
The Log lists all events that the DVR monitored, whether or not any footage was recorded as a result.

Network: General

Network Access: Here you can choose between the three different types of networks that the DVR can be connected to. The three types of networks are:
DHCP: DHCP (Dynamic Host Configuration Protocol) is a system where one device on your network (usually a router) will automatically assign IP addresses to devices connected to the network.
STATIC: Static networks require all devices to have their IP addresses manually defined, as there is no device dedicated to automatically assigning addresses.
PPPoE: An advanced protocol that allows the DVR to be more directly connected via a DSL modem. This is an option for advanced users only.
IP Address: Just as houses and businesses need to have an address which identifies their location on the road network, so too do computers and other devices need addresses (called IP ADDRESSES) to identify their position on the electronic network. The DVR uses IPv4 addressing, which consists of four groups of numbers between 0 and 255, separated by periods. For example, a typical IP address might be "192.168.1.24" or something similar. The most important thing when setting the IP address is that nothing else on your network shares that IP address.
Subnet Mask: If the IP address is like a street address, then a subnetwork is like your neighborhood. This will be formatted in a similar way to the IP address (i.e. four numbers up to 255 separated by periods) but contain very different numbers. In the above example, the Subnet Mask might be something like: "255.255.255.0".
Default Gateway: This is the address of the "way to the Internet" - to continue the road analogy, this is like your local access point to the highway. This is an IP address in the same format as the others, and is typically very similar to the IP address of the DVR. To continue the above examples, it might be something such as: "192.168.1.254".
Auto DNS / Static DNS: Choose how you'd like to define your DNS servers. We recommend leaving it on Auto unless you've got a specific reason not to.
Auto DNS: The DVR will automatically choose a DNS server. This is the recommended setting.
Static DNS: If you need to manually define a DNS server, then choose Static DNS. This is recommended for advanced users only.
Preferred DNS Server: "Domain Name System". Everything on the Internet is located via an IP address - however, for ease of use, we associate domain names (such as
"www.exampledomainname.com") with those IP addresses. This index is accessible in many locations online, and we call those locations "DNS servers".
DNS for STATIC configuration: Under most circumstances, you can set the DNS Server address to be the same address as your router (this is usually the same address as Gateway).
DNS for DHCP configuration: Typically, the DNS Server address will automatically be detected by the DVR. In some cases, you'll need to enter a value - the address of your router (the same as the Gateway) should work.
Alternate DNS Server: A backup DNS server. This is here as a redundancy - your DVR will probably work without one.
MAC Address: The Media Access Control address. This is a unique code which nothing else should share. You can't change this one - it's pre-set when the DVR ships out.
Network: Advanced

Note: Many of the following networking settings are not required when using SwannLink P2P for remote access.
DDNS: The place to configure the DVR to automatically update a dynamic DNS service. DDNS is not required for SwannLink P2P remote access. If you intend to access your DVR using older IP technology you will need to configure this service. See "Network: Advanced: DDNS" on page 35 for details on setting up and configuring the DDNS.
NTP: Network Time Protocol. If you've got the DVR connected to the Internet, you can have it automatically sync time with an online server.
Email Settings: Where you can configure the DVR to work with an email account of your choice. This must be correctly configured for the DVR's auto-email feature to work. For more information, see "Network: Advanced: Email Settings" on page 36.
IP Filter: An advanced feature which allows you to exercise precise control over what devices/IP address(es) are allowed to communicate with the DVR and which are not. Recommended for advanced users only.
Server Port: This is the port that the DVR will use to send information through. The most important things are:
You'll need to enable UPnP on your router so your router can selectively open these ports, allowing the DVR to communicate via the Internet. If your router doesn't support UPnP, you have two options. You can either get a new router (which we'd actually recommend - UPnP is such a good feature!) or you can manually forward ports from the router to the DVR. Port forwarding is a technical and involved process, recommended only for the technically inclined.
Nothing else uses this port. The default port number is 9000, which is not used by many other devices/programs. However, particularly if you have another DVR or DVR-like device, something might be using this port already. If this is the case, change this value to be unique.
HTTP Port: This is the port through which you will be able to log in to the DVR.
- Like the server port, it will need to be forwarded properly in order to ensure smooth, latency-free communication. The default value is "85", as this port is seldom used by other devices or applications. If there is another device on your network using this port, you'll need to change it to be unique.
- This is the port number you'll need to remember when logging in remotely from a remote PC via the HTTP interface.
What port number(s) should I use?
If the default port numbers are in use (85 and/or 9000) then the simplest solution is just to keep "adding one" until you find a port which is not in use. So, if 85 is already taken, try 86 or 87.
There's no "right" port number(s) to use - any port number will work provided the DVR is the only device using it. For this reason, avoid using port numbers 80, 81, 82, 88, 90, and 99 as these are often used by other devices/programs/protocols.
UPNP enable (This feature is not required if you are using SwannLink P2P to access the DVR): UPnP makes configuring your network easier and faster. To use the UPnP setting on the DVR, you'll need a router which supports this feature, with UPnP enabled. Note that many routers which do support UPnP do not come with the feature enabled by default. You may need to ask your Internet service provider to turn it on.
When UPnP is enabled on your DVR and your router, the Ports that the DVR requires to be open for access to and from the Internet will automatically be opened and closed as necessary by your router, saving you the trouble of manually forwarding these ports. If UPnP is not enabled, or your router does not support this feature, you'll need to forward the ports the DVR uses from the router to the DVR - since this is a technically challenging process, we strongly recommend using UPnP if possible.
UID: The DVR's Unique Identifier code for P2P. For convenience, you can have this code sent to your email account by clicking the Send Email button(provided that you've already set up your email account).
Network: Advanced: DDNS

Static and Dynamic IP Addresses
In much the same way as your home network can use static or dynamic IP addresses, many Internet providers don't issue (or charge more for) a static IP address for users. The easiest way to find out is to contact your Internet service provider. Alternately, you can access the www.whatismyip.com service, make a note of your IP, then reboot your router/gateway. This should refresh your Internet connection. If your IP address changes, you have a dynamic IP address. If it stays the same, you may have a static IP - contact your ISP to confirm.
How do I deal with a dynamic IP address?
One option is to contact your ISP and request a static IP address. They'll usually charge a small fee for doing this. It's worth noting that not all ISPs offer static IP addresses.
If your ISP does not offer static IP addresses then you can use a dynamic referencing service. We provide one free of charge.
We recommend using SWANNDVR as your DNS service. This is a free service for Swann DVR owners, which we directly support.
To create an account with SWANNDVR, go to:
http://www.swanndvr.com/
and click the Registration button.
Follow the prompts to create your account.

DDNS is not required for SwannLink P2P remote access. If you intend to access your DVR using older IP technology you will need to configure this service.
DDNS Type: Choose the server that you're using. We recommend SwannDVR - you can sign up for your free account at www.swanndvr.net.
Device Domain Name: Enter the host name that you set up in your DDNS service. This is the address you use to access your network. For example: yourhostname.swannDVR.net
Username and Password: Enter the username and password you setup with your DDNS server. These do not have to match your username/password combination in either your DVR or router (for the sake of security, we suggest making them different).
For SwannDVR users: Your username is the email address you used to register the account. The password is whatever you selected when you registered.
Test: To check if the DDNS is working, click the Test button. After a short delay, a message will be displayed on-screen, informing you whether the update was successful or not.
If the test is unsuccessful, a message will appear onscreen informing you that the "Update was Unsuccessful". This could mean there's a problem with your network setup, or there's a problem with the DDNS Account Name and Password you're using.
Network: Advanced: NTP

Particularly important if you've enabled NTP - set this to the time zone where you happen to be. For example, people in eastern Australia (Canberra, Sydney and Melbourne) choose GMT+10:00, whilst the Eastern Time zone in the USA and Canada is GMT-05:00. (GMT stands for Greenwich Mean Time - it's the baseline that keeps all the different time zones in sync.)
NOTE: Some NTP servers are NOT fully compatible with DST (Daylight Savings Time). This may cause your system to double-count adding one or removing one more hour than they should, or cancel each other out. You may need to intentionally change your time zone to compensate, or simply not use NTP and DST simultaneously.
Network: Advanced: Email Settings
If you want the DVR to occasionally drop you a line, share news, tell you about its day and - more importantly - tell you what's going on around your home or business as it happens, then you can configure it to automatically send email alerts as events happen.

We suggest using Gmail as your email client - it's quite easy to set up an account and use it solely for the DVR. We've tested the email procedure with Gmail, and it does work.
Other email servers may not work correctly - many interpret the procedurally generated email from the DVR as spam and block the mail from being sent.
For the Auto-Mail function to work correctly, the DVR will need to be correctly configured with the details of the email servers and addresses you want to use.
Enable SSL or TSL: Whether the email server you're using requires a secure link. This is on by default, and should be left on if you're using any of the preset email servers.
SMTP Server: There are three preset options to choose from, Gmail (smtp.gmail.com), Windows Live Mail (smtp.live.com) and Yahoo Mail (smtp.mail.yahoo.com).
You'll need to setup an account with one of these email providers. All offer free email accounts. To signup, visit the email provider's website:
Gmail (Google):
smtp.gmail.com
Yahoo Mail:
Windows Live Mail (Hotmail): smtp.live.com
The DVR will automatically adjust some settings (such as the SMTP port number) to make configuration significantly easier.
Other (check-box): This is for user who want to use a different email server, typically the outgoing email server of their ISP. If you want to use your ISP's outgoing email, then you'll need to contact your ISP to learn the correct values for the other fields (such as the correct SMTP server, SMTP port, SSL or TSL requirements and so on).
SMTP Port: The SMTP port used by the email provider of your choice. This field will automatically self-populate if you use one of the presets.
Sender Address: The address you're sending the email from. This will be the username you've set up for the email server you're using, followed by "id" and then the email server. For example: "youraddress@gmail.com" or similar.
Sender Password: The password for the outgoing email account.
Recipient Address: The email address you want the DVR to send emails to. This can be any email address you like, however, bear in mind that the DVR might send a large number of automatic emails under certain conditions.
Attach Picture: When this is selected, the DVR will attach a small image to each email alert (where applicable).
For motion-based email alerts, this will be an image of whatever triggered the motion detection.
Interval: The length of time that must elapse after the DVR sends an email alert before it will send another.
Short Interval settings are likely to lead to huge numbers of alerts being sent by the DVR - perhaps even several emails for one event (if that one event lasts longer than the interval setting). On the other hand, a long interval setting might mean you'll miss a specific update that you needed. There's no right answer, and you'll probably have to fine-tune this setting to get the results you're after - it'll be different for everyone's unique circumstances.
Network: Advanced: IP Filter

The IP Filter can be used to modify which IP addresses have permission to talk to the DVR and which do not.
This is an advanced feature, and is recommended for advanced users only. Tinkering with things here - if you're not sure what you're doing - is more likely to break things than make anything better.
Network: Network Status

The Network Status screen displays a quick summary of your network settings. You can't alter things here - see the General and Advanced tabs for places to actually alter things.
Note that the values displayed in the image above are examples only. Your network settings may be similar or very different!
Alarm: Motion

If you're planning to use Motion Detection as the primary (or sole) recording mode for the DVR, it's worth taking a moment to ensure it's properly configured.
If the motion detection sensitivity is too sensitive, then the DVR will record too frequently or continually - any benefit of motion detection will be lost.
If the motion detection sensitivity is not sensitive enough, then the DVR will not record when it should and may not record anything at all.
We think that motion detection is the best way to get your DVR to operate almost autonomously for long periods of time (typically weeks to months) without you having to worry about losing old footage.
How Motion Detection Works
The way that the DVR looks for motion is quite straight forward - it's a process where it compares one frame (that is, a single image taken approximately a 25th/30th of a second from the previous image) with the next. A certain amount of "difference" between these two "frames" is interpreted as motion.
As a result, the DVR is able to detect when there is a change in the picture. However, this does not necessarily need to be something moving in the frame. For example, a light being turned on or off, a lightning flash or even the sun coming out momentarily on a cloudy day might be enough to trigger the motion detection on the DVR. However, as these events last only a moment (and are relatively rare) they will only create a few very short redundant clips, which will not take up too much space or pose a problem with scanning through footage.
For a similar reason, don't use PTZ systems and motion detection simultaneously. The DVR will interpret the camera moving as 'motion' and record. This is particularly true when using Cruise Mode - as the camera is moving almost continually, so too is the DVR recording almost continually! Here, you'll be able to set the motion detection features of the DVR for each channel. We suggest that motion detection is, under most circumstances, the most practical recording method for the DVR to employ.
How it Works: Once motion detection has been enabled for a channel, it will register to the DVR as a Motion Event. Thus, you can use the Motion recording mode in the schedule to trigger the DVR to record when motion detection triggers an alarm signal.
Enable: Whether or not motion detection is enabled on a specific channel. Each channel can be configured independently of one another.
Motion Detection: Click the applicable Set button to setup the motion detection area for that channel. See "Alarm: Motion Detection Configuration" on page 39 for details on how to do this, and what it means.
Say, for example, you are trying to monitor your front yard, whilst in the background there is a busy street, and the cars driving past continually set off the motion detection. What can you do about it? Setting only part of the camera's view to be motion sensitive might be the answer. This is useful in a
number of circumstances, such as monitoring one particular door at the end of a busy hallway, or a backyard with a tree that keeps blowing in the wind.
Action: Here you can define what will happen when the camera you've selected detects motion.
Note: If you've used the Copy-To feature to copy from one camera to another, remember that you'll still need to set the Action for each channel independently - that information isn't copied.
Alarm: Motion Detection Configuration
To set the Motion Detection Area

natural_image
Interior living room with red sofas, a large glass door, and a wooden cabinet (no visible text or symbols)In the MOTION DETECTION menu, use the mouse or the arrow buttons to highlight the SETUP button for the channel you wish to setup the MOTION DETECTION AREA for, and confirm by pressing select or left clicking.
You will see a grid of red boxes. The outlined boxes mark the area that is sensitive to motion. The area without the red outlines is not sensitive to motion.
Use the mouse to move the cursor around the screen.
By pressing select or left clicking an area in the grid, you can toggle motion detection ON or OFF in that location.
Areas marked by red boxes will be sensitive to motion, those not marked will not be.
Click and drag to select the area you want to select or deselect.
In the sample image above, a person moving about the room would trigger the motion detection. However, a person entering from the right of screen and ascending the staircase should avoid the motion sensitive area. This is a good solution to monitor the door (center of image) without getting false triggers every time someone ascends the stairs.
Sensitivity: The Sensitivity setting is controlled by a slider, allowing you to set a value between 0 and 50. The lower the number, the more sensitive the motion detection will be.

There are four time periods which you can define different motion sensitivity values for.
You can change what time(s) each period starts and ends to best match the changing lighting conditions in your location. Typically, values between 5 and 10 will give good results in the daytime.
At night, you may get numerous false triggers unless you raise the sensitivity setting, perhaps as high as 25 - 30. This is because when cameras (particularly CMOS-based ones) use active infrared night vision, they dramatically increase the gain controls to the image sensor. This creates a lot of "noise" in the camera's images, which are interpreted by the DVR as motion.
By default, the day is divided into four periods:
00:00 (Midnight) - 06:00 (6:00 AM)
06:00 (6:00 AM) - 12:00 (Midday)
12:00 (Midday) - 18:00 (6:00 PM)
18:00 (6:00 PM) - 00:00 (Midnight)
You might need to shift the beginning and ends of these times to best suit the time(s) that lighting changes at your location.
The start and end times can be set to anything you like, provided the different time periods don't overlap and there's no gap between one ending and the next starting.
There's no requirement for all four time periods to have different sensitivity levels, although we suggest that usually gives the best performance.
To find the best sensitivity values for different times of day/night, it's best to test the system during different time periods.
Get an able-bodied volunteer to move about in front of the cameras you'd like to tune the sensitivity for. The ideal sensitivity level is when your volunteer moving about always triggers the motion detection, but there are no false triggers (or very few) when your volunteer isn't moving about.
Alarm: Motion Detection Notes
Motion Detection Recording Setup
Note: PTZ systems are fundamentally incompatible with motion detection. Avoid enabling motion detection on a channel which has a PTZ system attached to it - especially when the PTZ system is set to Cruise Mode.
False Triggers
Setting the motion detection at high sensitivity levels (4 or lower) increases the frequency of false alarms. On the other hand, low sensitivity levels (20 or higher) increase the risk that a significant motion event (such as an intruder) will not trigger the motion detection to record.
Check the Motion Detection settings both during the day and at night. In low-light conditions (or when your cameras are using infrared night vision) the DVR may be more or less sensitive to motion, depending on your unique circumstances. The difference might be very dramatic!
Weather
The weather conditions are going to affect your motion detection. Dramatic weather phenomenon such as heavy rain, strong winds, lightning and so on, may trigger the motion detection with surprising frequency.
On the other hand, things like fog, mist and other obscuring kinds of weather might mask or obscure something moving to the point that the DVR fails to detect them.
Here are a few steps you can take to minimize the amount of noise in your images.
- Try adjusting the Image Settings (see "Display: Camera" on page 24 for details) to fine-tune the brightness and contrast to get a more stable image.
- Limit the motion sensitive area to only the areas in view that a target could be. In particular, large featureless areas in the camera's view are the ones most likely to give false triggers - turning off the motion sensitivity to any area a target cannot move in front of will help reduce false triggers.
Note: The motion detection feature will seem more sensitive at night, particularly when using low-light or active infrared cameras. We recommend that you test your motion detection sensitivity both during the day and at night to ensure your sensitivity setting is suitable for either lighting condition.
Some tips to customizing your motion detection sensitivity and actions:
- Consider how important it is to be notified of motion events as they happen.
Using the email alerts is a great way to be kept up-to-speed on what's happening, but may quickly become annoying if something occurs which will generate a number of false triggers. As a rule, we suggest employing the email alert only on interior cameras during times that no one should be moving about in front of them.
- It can be important to have a complete record of a subject's movements and actions for legal reasons.
If your cameras capture an illegal event (typically an intruder, but we're continually surprised by stories from our users) it is important to have as much information as possible.
For example, images of someone in your home may not actually prove that they broke in - but footage of them breaking a window does. If you use a camera inside the home to trigger all exterior cameras with pre-record enabled, then you will have a record of how they entered in addition to what they did.
Always consider what's really important.
Which is the bigger problem - a dozen false triggers per day, or missing one critical event?
There's no magic setting which will make motion detection work perfectly. There will always be some events that it's not sensitive enough to catch, or minor happenings that will trigger an overly sensitive camera to record. Typically, the best motion detection settings are one's that give few false triggers but don't miss anything.
Even motion detection which false triggers a few times per hour will still save a significant amount of hard drive space compared with a constant recording schedule for the same duration.
- Position your cameras well.
- Many issues seen with motion detection and security cameras can be traced back to poor positioning of the camera itself.
- Make sure the area in front of your cameras is as clear as possible so it has and unobstructed view of potential activity. Consider the center of the camera image is the "sweet spot" which gives you the highest detail and the best image clarity so the center of the image should be right where you need to see the real activity.
- Position you camera so that any potential intruder's face will have to pass the center of the image as closely as possible without allowing the camera to be tampered with.
- Also note that while having the cameras show some sky in the image might make the picture look nice it is also a higher level of contrast the camera has to deal with, keep the sky and any other bright objects to a minimum so that the camera has the best chance of getting the image you need to identify the intruder or licence plate.
- Keep the view distance to the shortest possible. Place the cameras as close to the subject as possible to ensure you get the best possible level of detail. Digital zoom can make the image bigger but if the camera is too far away then no amount of digital zoom will make the subject any clearer.
- Where possible have some overlap for your cameras. Overlapping camera views make it difficult for someone to access and tamper with one camera without another camera capturing some video of the event.
- Keep your cameras clean. Dirty lenses can affect the image quality, give the lens a clean from time to time. Note that spider webs are almost invisible during the day but are extremely reflective at night which can dramatically affect the night vision from your cameras, so keep the spider webs away from your cameras too.
Alarm: Motion Detection - Action

Audio Warning: The DVR will use its internal buzzer to emit an alarm tone. It sounds like an old computer indicating an error, or a large truck backing up.
Send Email: The DVR will send an auto-email alert when the event type you've selected occurs. The Email Settings button will take you to the same email configuration screen accessible from the Network menu - see "Network:
Advanced: Email Settings" on page 36 for details.
Trigger Camera: You can define one camera's motion detection to trigger recording on one or more other cameras.
This can be useful in a number of situations. For example:
If you have two cameras overlooking a yard, one with a wide view from well overhead and one with a much narrower
view of a corner or path. You may find that using the camera with the narrow view for motion detection gives fewer false triggers and doesn't miss an event as often as the really wide view might, so triggering the wide view to record as well ensures you know where the subject went after they left the narrow view.
One camera might face a public area, while another camera looks down a private corridor which exits into the public area. Having the camera in the private area trigger the one in the public area to record can give you a record of where a subject went after they left the private area, without filling your hard drive with recordings triggered by random passers by.

The Trigger Camera Option will override the recording mode that has been set for the camera at that particular time that it is triggered for recording.
Alarm: Video Loss

Alarm: Video Loss
Video Loss is regarded as a potential alarm event, and is considered to occur any time that the DVR doesn't receive an active video signal on any of its inputs.
The default behaviour of the DVR, when a channel has no incoming video signal, is simply to display "Video Loss" in white text on a black background over the associated channel. If you're not using all the inputs on your DVR, then some channels will be in "permanent" Video Loss state. Just be sure that you don't enable a video loss action for these channels.
Channel: Which channel/camera you'd like to set the Video Loss behaviour for.
Enable: Whether the selected channel has video loss monitoring active or not.
Schedule: Alters when the current Video Loss Action will be active.
Action: The action you'd like the DVR to take when this event occurs. It's set in the same way as the Action for any other event.

Alarm: Video Loss - Action
Audio Warning: The DVR will use its internal buzzer to emit an alarm tone. It sounds like an old computer indicating an error, or a large truck backing up.
Send Email: The DVR will send an auto-email alert when the event type you've selected occurs. The Email Settings button will take you to the same email configuration screen accessible from the Network menu - see "Network: Advanced: Email Settings" on page 36 for details.
Alarm: Exception

An Exception is any deviation from the DVR's normal behaviour - phrased another way, it's like saying the DVR's been working fine except for these events
Exception Type: What event type you'd like the DVR to react to. By configuring the Action for these events, you can create any combination of audio alerts (see below) or auto-emails to be sent for different event types.
HDD Full: As the name suggests, this event occurs when the DVR runs out of space on the hard drive to save new footage. This event is redundant if you've got overwrite enabled, as the DVR will automatically delete old footage to ensure it can continue to record.
HDD Error: Occurs when the DVR has trouble accessing its hard drive, or when it cannot detect one at all. This error could be generated by either an internal hard drive, or an external one connected to the eSATA port.
Net Disconnected: Will occur if the DVR has problems connecting to the Internet. This may indicate a problem with the DVR's configuration, a fault with your network or a problem with your Internet Service Provider (ISP).
IP Conflict: This event will occur if the DVR detects another device on the same network with a conflicting IP address. It's a little like two houses with the same number being on the same street - one house might get the other's mail, or get woken up at all hours of the night being asked if someone named "Big Bob" lives there.
Basically, it indicates that two devices are trying to use the same IP address. This shouldn't occur if you're using DHCP addressing, unless one or more devices is set to use a STATIC IP (the static addressing method overrides the automatic assignment process).
Audio Warning: The DVR will use its internal buzzer to emit an alarm tone. It sounds like an old computer indicating an error, or a large truck backing up.
Send Email: The DVR will send an auto-email alert when the event type you've selected occurs.

Show Exception: The DVR will display the icon at the bottom right corner of the main screen when the event type that you've selected occurs. Click on the icon to access the Event Log and know more about the exception that occurred.
Device: HDD

Typically, there will be one entry here, and it will be the hard drive that came with the DVR - you'll get many years of usage out of the included hard drive.
The drive connected to the internal SATA port will be listed here. A drive connected via eSATA will appear on this list, and be useable in the same manner as an internal HDD.
External drives connected via USB will not appear on this list, and can't be used to record footage - USB lacks the bandwidth to write multiple streams simultaneously. External USB drives can only be used for backing up footage.
Device: S.M.A.R.T.
![Display Recording Search Network Alarm Device System Shut Down HDD S.M.A.R.T PTZ disk :0 [465 GB] No: WD-WCAV9R795 Firmware: 01.00A01 Status: Good Name Current Worst Threshol/Status raw-read-error-rate 200 200 51 yes spin-up-time 201 192 21 yes start-stop-count 100 100 0 n/a reallocated-sector-count 200 200 140 yes seek-error-rate 100 253 0 n/a power-on-hours 96 96 0 n/a spin-retry-count 100 100 0 n/a](/content/2026/05/961407/images/e29a56347d0a66f0ba8466132bbc19dac0c19071970660748a97224e8348639a.jpg)
S.M.A.R.T. (Self-Monitoring, Analysis and Reporting Technology - gotta love a good acronym) is your hard drive's way of telling the DVR how it's going.
Status: The current condition of the hard drive. It should say "Good". If it says anything else, this indicates there's a problem with your hard drive.
If there's no problem, there's little else to do here, unless reading the output of the dozens of self-tests the hard drive performs on itself is of interest to you.
If you have been confronted with a HDD Error, or the Status entry doesn't read "Good" then you can use the S.M.A.R.T. information to attempt to diagnose the problem. The information presented in the S.M.A.R.T. report is practically identical to what you'd see on a desktop PC while using Administrator Tools, or a similar service.
Device: PTZ

Important:
Don't use Motion Detection on channels with PTZ cameras attached. The DVR can't tell the difference between something moving in front of the camera and the camera itself moving!

PTZ Settings
This is where you can configure the DVR to be able to operate PTZ devices. PTZ stands for Pan, Tilt & Zoom.
The DVR is compatible with many - but not all - PTZ devices available. For the best results, we suggest using a Swann PTZ camera, as we know what they're compatible with and we'll be able to offer support for both devices at once (should you need it).
Camera No: The camera you'd like to associate a PTZ device with.
Baudrate: Check the PTZ device's documentation to learn this value. Most Swann PTZ units operate at 2400 or 9600bps.
Data Bit, Stop Bit & Parity: Options that subtly change the way the DVR talks to the device. This is important to get right - check your PTZ device's documentation to learn the correct settings.
PTZ Protocol: A protocol is like a language that the DVR uses to talk to the PTZ device. Ensure that this setting matches the requirement of your device.
Address (0 - 255): The command address of the PTZ device you want to associate with this channel.
Accessing the PTZ Controls
The PTZ controls can be accessed from the Live Viewing screen by choosing the PTZ icon on the menu bar.
Note for Remote Access and Mobile Device users:
The PTZ functions of the DVR and compatible cameras can be controlled remotely via the SwannView Link software and mobile app.
Please note: due to the latency (a fancy word for "delay") caused by streaming so much data over an Internet connection, there will be a momentary pause between selecting a direction for the camera to move and it actually moving.
Typically the delay will be less than one second; however periods of up to thirty seconds are not uncommon on mobile, wireless or slow Internet connections.
Device: PTZ

PTZ Control Window
Arrows: Moves the camera in the direction selected.
Speed: How fast the camera will move. The higher the number, the faster the movement. Note that the actual speed of movement will depend upon the capabilities of your particular PTZ device.
Zoom: Increases or decreases the magnification of a varifocal lens. Not all PTZ devices have varifocal lenses.
Focus: Alters the focal point of a PTZ device with a varifocal lens. Try adjusting this control if your images seem "soft" or blurry. Not all cameras support this function.
Iris: Alters how much light gets into the camera by opening and closing the iris of the camera. Not all PTZ cameras have an adjustable iris. Also called an "aperture". Not all cameras support this function.
Preset: A Preset is a position that the camera is in which is saved to memory to be retrieved later.
Patrol: Initiates patrol mode (also sometimes called "cruise" mode). You'll need to define a series of Preset points for the camera to patrol between.
Exit: Closes the PTZ controls.
PTZ Context Menu
Camera No: Switch quickly between cameras.
Call Preset: Returns the camera to a Preset point.
Call Patrol: Initiates a patrol of your choice.
Preset: Defines a Preset point.
Patrol: Initiates or stops a patrol.
PTZ Menu: Toggles the appearance of the PTZ Control Menu onscreen. While the PTZ Control Menu is hidden, the DVR will still be in PTZ mode, and the context menu can still be opened via right-clicking the interface.
PTZ Settings: Opens the PTZ Settings menu, where you can adjust the control method for the camera.
System: General

The System: General menu contains many of the settings you'll need to configure to get the most out of your DVR system. Most importantly:
• The time and date can be set here.
- You can select the language you want for the menus/GUI.
- The configuration for automatic adjustment to daylight savings time is here.
- You can easily enable or disable password protection - but will have to create a valid username/password
Language: The language that the DVR's menus, alerts and other communications will use. This usually defaults to English.
Be careful not to change this setting unintentionally - it might be tricky to find the setting to change it back when the DVR is speaking another language!
Video Standard: Here you can choose between PAL and NTSC. PAL is used in Western Europe and Australia, NTSC is used in the US, Canada and Japan. If the DVR's picture is black and white, flickering or similar, then this is probably caused by the video system being set incorrectly. Don't change this setting unless advised to do so by Swann Technical Support. You may not be able to see the DVR's output on your screen anymore!
Time Zone: Particularly important if you've enabled NTP - set this to the time zone where you happen to be. For example, people in eastern Australia (Canberra, Sydney and Melbourne) choose GMT+10:00, whilst the Eastern Time zone in the USA and Canada is GMT-05:00. (GMT stands for Greenwich Mean Time - it's the baseline that keeps all the different time zones in sync.)
Menu Date Format: The format of the date (e.g. DD/MM/YYYY or MM/DD/YYYY and so on).
System Time: This can be edited manually, or set to update automatically by using NTP (see "Network: Advanced: NTP" on page 35).
DST Setting: As the standards for daylight savings differ from country to country, and often state to state, you might need to manually tell the DVR exactly when it commences and ends in your locality. First, turn DST on. We suggest setting the Daylight Saving Time Mode to Date, and manually entering the dates and times that daylight savings time applies to and from, in your locality.
Note: Some NTP servers are NOT fully compatible with DST. This may cause your system to double-count adding one or removing one more hour than they should, or cancel each other out. You may need to intentionally change your time zone to compensate, or simply not use NTP and DST simultaneously.
Enable Password: When enabled, the DVR will require a password to access, even for local users. It's advisable to enable password protection
Auto Lock Time: When the password protection is enabled, the DVR will automatically time-out, where after it will ask for a password before returning to normal functioning. The Auto Lock Time determines how long a period of inactivity will cause the DVR to lock itself again.
Device ID: Differentiates your DVR from other devices. If you don't have any other DVR's or similar devices, then you can leave this as-is. If you've got multiple DVRs running on the same network, then it's a great idea to give each a unique ID.
System: User

User Name: Select a name for the user you want to define.
The best usernames are short, to the point, are relevant to the specific user they're intended for, are easily memorable and hard to guess.
Password: A password can be any combination of numbers (0 though 9) between one and eight characters long.
Confirm Password: Must exactly match the password for the definition of a new user to be successful.
Level: There are two default levels of access to the DVR - Guests and Operators.
Guest: By default, a Guest user has access to the live images on the DVR and can search through recorded events. They cannot change any settings or configure the DVR in any way.
Operator: The default permissions of an Operator allow them to access and configure all aspects of the DVR.


The System: User menu is where you can define and configure the different levels of access various users have to the DVR.
We suggest that at minimum the admin account be password protected, as it has access to all aspects of the DVR's operation.
To add additional users, choose Add.
To remove a user, choose Delete.
To customize a user's level of access, choose Modify.
You cannot modify the access level of the default admin account - they can do everything. This is to prevent an unfortunate incident where, for example, no user has the permissions required to change another user's permissions - which could lead to the DVR being, in at least some senses, inoperable.

You can easily customize the level of access each individual user has. Simply choose the Permission button on either the Add User or Modify to set the specific access for the user you want. The Permission menu has two tabs - Configuration and Operation.
Configuration: The configuration page specifies which menu(s) the user can access. There is no hierarchy and any combination of menus can be selected (although some combinations would make little sense in practice).
Operation: You can select which channels the user has access to, and what they can do with them. For example, you could set a user to have permission to view all channels in live viewing mode, but only playback channels 2 and 4.
Press the Set button next to each type of access to select specific channels that the user can access.
Also, this page contains permissions for HDD Management and Shutdown. These are surprisingly powerful levels of access: between them, a user can remove all footage from a DVR's hard drive and turn the DVR off. Be careful assigning these permissions!
System: System Information

If you're looking at the System Information screen, you've probably been directed to do so by Swann Technical Support.
If we haven't told you to come here, you might be wondering what all the information means. On a day-to-day level, the answer is "very little". However, if you're still curious:
Device Name: The name that the DVR considers to be its own and what it will use to register an IP address with your DHCP host.
The remaining information is for use by Swann's Technical Support, in the event that you require assistance. The various model and build numbers help us track down any known issues, or catalogue new issues as they come to light. It also helps us figure out if you're running the most recent firmware on the DVR, and whether you'd benefit from an upgrade.
System: Maintenance

To maintain the operational integrity of the DVR, it is suggested that it be rebooted periodically. In much the same way that a computer can become unstable if left on for an extremely long time, the DVR can become unstable. It is strongly suggested that the DVR be rebooted at least once per week.
However, as this can be a hassle (particularly if the DVR is stashed away somewhere inconvenient) you can set the DVR up to reboot itself.
Enable auto reboot: Will automatically shut the DVR down and restart it at a certain time of the day or week.
Auto reboot at: Choose when you'd like the DVR to reboot. Typically, this will be a time when it's unlikely there'll be any activity for the DVR to record.
Firmware Upgrade (Upgrade): Instructs the DVR to update its firmware. You'll only need to use this option if instructed to do so by Swann Technical Support. (Remember to Export your configuration first so you don't have to re-set everything!)
Default Settings (Restore): Loads the factory default settings.
This must be done after a firmware upgrade to ensure proper operation of the DVR. You can retain your settings, recording schedule and so on by using the Import/Export Configuration function before upgrading the firmware.
Configuration (Export): Creates a file containing all the settings you've customized, including your recording preferences, schedule, user-list and so on.
To export your settings:
- Insert a USB flash drive into the USB port on the front of the DVR. Ensure it has enough free space (a few MB is sufficient - the file is less than 50KB) and that it is not write-protected.
- Choose Configuration: Import/Export.
- You'll see a file browser, showing the contents of the storage device.
- Click Export to save your settings.
- Exporting your settings will overwrite any previous settings you've saved to that flash drive. If you want to do sequential configuration exports, you'll need multiple USB drives - or, rename the file using a PC (advanced users only).
Configuration (Import): Operates in the same way as the Export function, but is used to load a previously saved configuration file.

Locate the file you want on your flash drive - it will be called config(time & date).tgz. For example, config20120404110829.tgz would be the config file from April 4, 2012 at 11:08AM.
Loading the file will cause the DVR to automatically reboot.
Chapter
4
Reference
SwannView Link Windows Interface

-
Start Live View
-
Stop Live View
-
Snapshot
-
Video Capture
-
Previous Page
-
Next Page
-
Volume
-
Split-Screen
-
Full Screen
Preview: The default live-view screen of SwannView Link.
The screen layout emulates the multi-channel live view screen of the DVR, showing you images coming directly from your cameras in near real-time (some delay is caused by the network/Internet connection you're using to access the DVR).
You can select a single camera, or multi-channel viewing by selecting either the Split-Screen (2 x 2) or Full Screen viewing mode buttons in the lower right corner. When in Split-Screen view, you can double-click the mouse on one of the cameras to switch to a full screen view. Double-click again to return back to split-screen view.
Playback: Opens the Playback interface, which operates in much the same way as the playback interface on the DVR itself.
Local Settings: Defines how SwannView Link will manage and save footage and still images to your local PC.
Device Settings: Allows access to the DVR's settings. The configurable options are very similar to those you'll find in the DVR menus.
PTZ Controls: These buttons are used to control PTZ devices (if connected to the DVR). They operate in the same way as those you'll find on the DVR itself.
Basic Settings: You can alter the brightness, contrast, saturation and hue of your images here. They operate in the same way as those in the DVR's menu (see "Display: Camera" on page 24 for more information).
Advanced Settings: You can alter how each camera adapts to different light conditions for day and night.
CPU Loading: How hard your computer is working to decode and display images as they arrive from the DVR. If this is consistently high, you can try:
- disabling multiple monitor setups. The SwannView Link application doesn't support hardware acceleration across multiple monitors. Disabling all but your primary monitor will greatly increase performance.
• reduce the number of video feeds being displayed. Select a channel and click Stop to disable the monitoring. - switch to single channel view.
SwannView Link: Local Settings

The local configuration screen is where you can customise how SwannView Link will store and process footage on the local PC when you download it from the DVR.
Record Path: Where SwannView Link will save recordings if you select Record from the Preview screen.
Download Path: Where SwannView Link will save footage that you've downloaded from the DVR.
Snapshot Path: Where SwannView Link will save still images captured using the snapshot function.
Convert to AVI: When selected, SwannView Link will use your PC to transcode footage from the DVR's native format (H.264) into a format that your computer (indeed, almost any computer) will be able to playback without special software.
About transcoding to AVI:
Don't be put off by the complex word - transcoding is just a shortening of "translating code".
Transcoding, while a straight-forward process, is very processor intensive. You may notice significant slow-down on your computer while the transcoding takes place. For best results, try not to over-burden your computer - just let it transcode the footage in peace.

Playback Problems?
Some media players have trouble playing back the transcoded AVI files from the SwannView Link software.
We recommend using VLC media player, which has no problems with the DVR's AVI files.
You can get it for free from www.videolan.org/vlc.
Note: Very few (if any) media players will be able to play the un-modified H.264 video streams that are the DVR's native format. The H.264 streams are raw video data with no "container" (AVI is a "container"). It's a little like trying to read a book with no punctuation or capital letters or spaces - the "transcoding" process puts in the spaces and the full stops and makes it possible to be "read" by someone other than the author.
Display: Channel Settings
Channel Name (Check Box): Whether the channel's name will be displayed on screen or not.
Channel Name: The title you'd like to give that camera.
Record Data: Whether the overlays (Channel Name, Date and so on) will be recorded onto the video with your images.
Position Settings: Select the position of the channel name and record date labels that are overlaid on the screen.
Mask (Check Box): Turns the masking function on or off.
Mask (Setup): Creates a black privacy overlay which masks part of your images. Will affect recordings.
Display: Output
Resolution: Set the screen resolution to output to your monitor.
Transparency: How transparent you want the DVR menus to be.
Mouse Sensitivity: Adjust the sensitivity of mouse movements.
Dwell Time: Select how long channels will be displayed when using auto-sequence mode.
Audio: This function is not supported by the camera(s) supplied with the DVR.
Recording: General
Encoding Parameter: Choose from the main-stream or sub-stream to configure.
Main Stream: The way the DVR will internally process and record video.
Sub Stream: The way the DVR will encode and send video to a remote device (such as the PC you're using to access the DVR).
Record Audio (Check Box): This function is not supported by the camera(s) supplied with the DVR.
Resolution: How many pixels (little dots) make up your image.
Frame Rate: How many images per second the DVR will capture. "Realtime" is 30fps (NTSC) or 25fps (PAL).
Max. Bitrate: The maximum size that your video files will be. The higher this is set, the better recordings will look - however, they'll also fill the hard drive faster.
Recording: Advanced Config
Overwrite: Whether the DVR will erase old recordings to make room for new ones, or not.
Pre-record: Whether the DVR will cache and save footage that occurs immediately before an alarm/motion event.
Delay: How long after an alarm event or motion the DVR will continue to record for.
Pack Duration: The amount of video that will be stored as a single "pack". Unless you have very specific requirements, leave this at the default value.
Recording: Schedule
Use the Copy To functions to quickly assign identical schedule layouts to multiple channels at once.
Be careful when programming your schedule. It's one of the most important aspects of setting up your DVR, and if it's wrong in any way, it could lead to complications later.
Note: Do NOT select Normal and Motion/Alarm-based recording at the same time on the same channel - this can cause conflicts in the way that the DVR interprets footage and event information.
SwannView Link: Device Settings





Network: General
Be careful adjusting settings here - if the DVR can't access the network anymore, you won't be able to configure it remotely!
Network Access: How your network is addressed - either DHCP or STATIC IP addressing.
Subnet Mask: A required additional piece of IP addressing information.
Gateway: The way "out" of your network, to the Internet.
Auto DNS / Static DNS: Whether the DVR will automatically select a DNS server, or use one you assign.
Preferred / Alternate DNS: The DVR has two DNS servers, essentially a primary and a backup.
MAC Address: The Media Access Control address. For some advanced networking, it can help to know this value.
Network: Advanced Settings
DDNS Setup: Opens the DDNS setup window (below).
NTP Setup: Opens the Network Time Protocol setup window (see below).
Email Setting: Opens the Email Setup window (see below).
Server Port: One of the two ports the DVR needs to communicate over your network. Ensure nothing else uses this port. The default value is 9000. This is the port number you'll use when logging in over the Internet from the SwannView Link software or remote access from a mobile device.
HTTP Port: The second of two ports the DVR needs to communicate over your network. Ensure nothing else uses this port. The default value is 85.
- NTP Setup
NTP Domain or IP Address: The server you intend to use to access the current date and time. The default is pool.ntp.org.
NTP Port: The port that the NTP server uses. The default for pool.ntp.org is 123.
- Email Setting
Operates in the same way as the email setup menu in the DVR menu. Rather than attempt to summarize here, it's easier to simply turn to "Network: Advanced: Email Settings" on page 36 to learn more.
- DDNS Setup
Where you can configure a Dynamic DNS server to track the "position" of your DVR over the Internet. Check out "Network: Advanced: DDNS" on page 35 for more information on DDNS servers.
We recommend using SWANNDVR as your DNS service. This is a free service for Swann DVR owners, which we directly support.
To create an account with SWANNDVR, go to:
http://www.swanndvr.com/
and click the Registration button. Follow the prompts to create your account.
SwannView Link: Device Settings



Alarm: Motion Detection
Channel: The channel you're configuring the motion detection settings for.
Enable: Whether the motion detection is enabled for the channel currently selected.
Sensitivity: A sliding scale between 1 and 50. The number refers to the number of pixels (as a percentage) that have to "change" between frames - okay, this one is a little more complex than this summary will allow. Seriously - check out "Alarm: Motion Detection - Action" on page 41 for a much more useful explanation of how motion detection works.
Action: What you'd like the DVR to do when it detects motion. Typically (assuming the schedule is configured to do so) this will be to record video. It can also be a cue to trigger an email alert, or to sound the DVR's internal buzzer.
Alarm: Video Loss
Action (Check boxes): Whether you'd like the DVR to send an email alert or to sound the DVR's internal buzzer.
Arm Schedule: The times of day/week you'd like the DVR to be "armed" to detect video loss.
Alarm: Exception
Exception Type: What event type you'd like the DVR to react to. By configuring the Action for these events, you can create any combination of audio alerts (see below) or auto-emails to be sent for different event types.
Audio Warning: Sounds the DVR's internal buzzer.
Send Email: Commands the DVR to send an email alert.
Show Exception: Shows any alerts that occur at the bottom right corner of the main screen. Double-click on the alert notification to see details.
SwannView Link: Device Settings

Device: HDD
Operates in the same way as the HDD management menu in the DVR menu. Rather than attempt to summarize here, it's easier to simply turn to page 43 to learn more.

System: General / System Information / Maintenance
Operates in the same way as the System submenus in the DVR menu. Rather than attempt to summarize here, it's easier to simply turn to page 46 to learn more.


SwannView Link Mobile Interface

- Menu - Opens the menu to allow you to select the various different menu screens.
- Live View - The Live View screen. A red border will surround the currently selected camera.
- Group Indicator - SwannView Link can display up to 4 channels at a time. The white dot shows which group of 4 cameras you are currently viewing. Swipe left or right to change between groups of cameras.
- Snapshot - Takes a snapshot of the currently selected camera and saves it to your mobile device.
- PTZ - This allows you to control any PTZ camera that you have connected to your DVR.
- Stop/Start all Cameras - Tap this to stop the live view of all cameras. Tap again to restart all cameras.
- Stop/Start selected Camera - Tap this to stop the currently selected camera. Tap again to restart.
- Record selected Camera - Records video from the selected camera to your mobile device.
- Enable/Disable Audio - Requires a camera with a built-in microphone.
SwannView Link Mobile Interface

- Live - Takes you back to the Live View screen from any other screen.
- Record List - Takes you to the Record List page where you can playback video that you have previously recorded to your mobile device.
- Device - The Device Management screen where you can add, edit or remove your DVR.
- Help & About Us - Tap this to access the built-in manual as well as the version information.
Troubleshooting
Q: The images from my cameras are black & white and/or flickering. What's up?
A: Most likely, your Video Standard isn't set correctly for your region. Check out the section on PAL/NTSC ("System: General" on page 46) for more information. As a rule of thumb, set your video standard to NTSC if you're in the USA or Canada, or PAL if you're in Europe, the UK or Australia.
If this is happening to only some of your cameras, then there may be a problem with the compatibility of those cameras. If you've got them from a kit, then this shouldn't be the case at all and it indicates that something quite strange is happening. If you have cameras purchased separately - particularly if you've found them online or from overseas - then they might not match the standards of the cameras you've already got. The DVR can only support one video standard at a time: mixing PAL and NTSC cameras does not work.
Q: I can't login to or unlock the DVR - it says my password is wrong.
A: The default username/password combination for the DVR is "admin" with the password section left blank.
The DVR does have a default password ("12345") but it should be disabled by default. If leaving the password section blank doesn't work, try 12345. If that doesn't work (and you haven't set a password of your own that you've forgotten) then something strange has happened - contact Swann technical support (contact details are on the rear cover).
Q: The DVR will boot up and show live images, but there are no menus being displayed. Why?
A: There might be a fault with the hard drive installed in the DVR. Before the menu system is displayed, the DVR attempts to detect the drive that is connected. If there is an ambiguous signal preventing the DVR from ascertaining whether there is a drive connected or not, then it will keep looking and waiting for the drive to respond.
If you've just installed a new drive, disconnect it and see if that fixes the problem.
Q: How do I eliminate false-triggers on my motion detection?
A: There's no guaranteed way to eliminate false triggers, but - in the majority of cases - you can fine-tune the DVR's motion detection settings to reduce the number of false triggers you're likely to get. (See "Alarm: Motion" on page 38 for more detailed information about setting motion detection.)
-
Mask any redundant movement. This includes obvious things like trees blowing in the wind, roads with cars passing and so forth. Some less obvious things which might cause false triggers include: the "flickering" of screens, monitors or fluorescent lights, reflections of movement in windows/mirrors and so on, lights which are often turned on or off, shadows passing and so on. We can't possibly imagine what you're going to find in your unique circumstances, so we encourage you to experiment.
-
Fine-tune your sensitivity. There's no substitute for getting a volunteer to play the part of intruder and experimenting. Some cameras are just more "touchy" than others; some lighting conditions are harder to get the settings "right" for. As a "rule", CCD cameras require a lower value than CMOS cameras, and that motion detection is going to be more
sensitive at night (whenever the active infrared night vision is active).
- Adjust your image settings (see "Display: Camera" on page 24). Unlike many image adjustment options, the DVR pre-processes video, which means that, when the DVR looks for motion, it's looking at your already processed images. By reducing the amount of video noise in your image, you can increase the accuracy of the motion detection dramatically. Typically, the settings that most often require adjustment are Brightness and Contrast.
Video noise is a problem with any video signal. It's the very slight change in brightness and/or color of pixels between frames, and it's commonly regarded as being "just one of those things" when dealing with digital imaging. By tweaking the brightness and contrast, you can usually remove a good deal of this noise, as it tends to be most pronounced near the blacks (the really dark bits) and the whites (the really bright bits) of your images.
Q: I'm getting too many email alerts from the DVR.
A: There are a few things that might help, depending what's generating the email alerts. Here are a few possibilities:
The emails are for real events, however it is telling me about it multiple times.
This indicates that the DVR is functioning properly, but that the Interval setting for your email alerts is too low. Increasing the Interval time will decrease the number of email alerts the DVR sends.
The DVR sends email alerts when nothing seems to be happening.
This suggests that there might be something amiss with your Motion Detection settings.
The most likely explanation is that there is something in view of your cameras which is moving, or causes the illusion of movement. Have a look at "Alarm: Motion Detection Configuration" on page 39 for some more information.
The DVR keeps reporting errors (such as Video Loss, HDD Error or similar).
There seems to be a hardware or configuration fault with the DVR. These are most often caused by a faulty (or simply poorly connected) connection or cable. Check the integrity of your cables and connections.
Third Party Hardware
Due to it's nature as a networked device, the DVR is often required to operate with third party hardware. We do everything we can to ensure the DVR is compatible with as many third party devices as possible, there will always be some that require a little extra configuration.
Routers
I'm using a router which doesn't support DHCP addressing
or
Some devices on my network require STATIC addressing.
You'll need to set the address of the DVR manually. You'll need to:
• Find Your Networks IP Address Range
- Create a Unique IP Address
- Assign the IP address information to the DVR.
Finding your Network's IP Address Range
First, you'll need to know the IP address, Subnet Mask and DNS Server of at least one other device on your network. It's easiest to find these addresses by using a computer on the same network.
For Windows-based PCs:
- Open the Start Menu, navigate to Accessories and open Command Prompt.
• Type "ipconfig" and press Enter. - Your IP Address information will be displayed.
For Mac-based systems:
• From the Apple menu, select System Preferences.
- Click on the Network pane.
- Click on the Advanced button and look under the TCP/IP, DNS, and Ethernet tabs.
Creating a Unique IP Address
The IP Address of your computer will be made up of four groups of numbers, seperated by periods: aaa.bbb.ccc.ddd
The first three groups of numbers (aaa.bbb.ccc) must be the same as the other device on your network. The last number (ddd) must be changed to something unique that nothing else on your network uses.
For example:
If your computer's IP address is 192.168.1.10, then a suitable unique IP address for your DVR will be 192.168.1.210
Note: Each number in the IP address cannot exceed 255.
Assigning the IP Address information to the DVR.
We recommend doing this locally (on the DVR itself) even if you can access the DVR via the network (using the SwannView Link software) in the meantime.
If you're connected remotely and the networking information changes, you might lose the connection to the DVR.
- Open the Network: General menu on your DVR (see "Network: General" on page 33).
- Select Static addressing.
- IP Address: Enter the unique IP that you created for the DVR here.
- Subnet Mask: Enter the same value as the computer's Subnet Mask.
- DNS Server: Enter the same value as the computer's DNS.
The DVR should now be accessible via your local network. Before you can access the DVR remotely, you'll need to Forward Ports (STATIC addressing does not support UPnP, see below).
I'm using a router which doesn't support UPnP. How do I "forward ports"?
It depends on what type of router you have. There's no standard procedure for forwarding ports - each manufacturer has their own user interface and procedure for customising the behaviour of the router.
First, check the router's documentation - the instructions may be there.
If your router's documentation doesn't describe the method for port forwarding, then open a web browser and navigate to www.portforward.com - they've got instructions on port forwarding for (literally) thousands of different routers.
We can't offer much more information about forwarding ports here, as this is a process totally dependent on third-party hardware. If you do run into trouble, we suggest contacting the manufacturer of the router.
Alternately, if you're using an older router which doesn't support UPnP, then it might be time for an upgrade - modern routers are increasingly powerful and are (in most cases) easier than ever to setup. We think that UPnP is a fantastic feature that's well worth having, not just for DVRs.
Warranty Information
USA
Swann Communications USA Inc. 12636 Clark Street
Santa Fe Springs CA 90670 USA
Australia
Swann Communications
Unit 13, 331 Ingles Street,
Port Melbourne Vic 3207
Australia
United Kingdom
Swann Communications LTD.
Stag Gates House 63/64 The Avenue
S0171XS
United Kingdom
Warranty Terms & Conditions
Swann Communications warrants this product against defects in workmanship and material for a period of one (1) year from its original purchase date. You must present your receipt as proof of date of purchase for warranty validation. Any unit which proves defective during the stated period will be repaired without charge for parts or labour or replaced at the sole discretion of Swann. The end user is responsible for all freight charges incurred to send the product to Swann's repair centres. The end user is responsible for all shipping costs incurred when shipping from and to any country other than the country of origin.
The warranty does not cover any incidental, accidental or consequential damages arising from the use of or the inability to use this product. Any costs associated with the fitting or removal of this product by a tradesman or other person or any other costs associated with its use are the responsibility of the end user. This warranty applies to the original purchaser of the product only and is not transferable to any third party. Unauthorized end user or third party modifications to any component or evidence of misuse or abuse of the device will render all warranties void.
By law some countries do not allow limitations on certain exclusions in this warranty. Where applicable by local laws, regulations and legal rights will take precedence.
For Australia: Our goods come with guarantees which cannot be excluded under Australian Consumer Law. You are entitled to a replacement or refund for a major failure and for compensation for any other reasonably foreseeable loss or damage. You are also entitled to have the goods repaired or replaced if the goods fail to be of acceptable quality and the failure does not amount to major failure.
Helpdesk / Technical Support Details
Swann Technical Support
All Countries E-mail: tech@swann.com
Telephone Helpdesk
USA Toll Free — 1 800 627 2799
USA Exchange & Repairs -1-800-627-2799 (Option 1)
(M-F, 9am-5pm US PT)
AUSTRALIA — 1300 138 324
NEW ZEALAND Toll Free -0800 479 266
UK 0203 027 0979