button to switch the Select line to either luminance, red, green, or blue.
- Line selection items switch each time the is pressed only when the waveform monitor is displayed.
| “Select line (luminance)” Displayed in white waveform. |
| “Select line (red)” Displayed in red waveform. |
| “Select line (green)” Displayed in green waveform. |
| “Select line (blue)” Displayed in blue waveform. |
Note
- Setting is also available by [FUNCTION BUTTON] (→ page 124).
- The waveform monitor cannot be displayed during [P IN P].
- The waveform monitor turns off when [P IN P] is executed during waveform monitoring.
- The waveform monitor is not displayed when on-screen display is hidden (off).
Project the luminance adjustment signal of a commercial test disk (0 % (0 IRE or 7.5 IRE) – 100 % (100 IRE)) and adjust.

bar
| Image position | Signal level |
| -------------- | ------------ |
| 0% | 0% |
| 50% | 50% |
| 100% | 100% |
1) Select "Select line (luminance)" on the waveform monitor.
2) Adjust black level.
- Use [BRIGHTNESS] in the on-screen menu [PICTURE] to adjust the black level 0 % of the video signal to the 0 % position of the waveform monitor.
3) Adjust white level.
- Use [CONTRAST] in the on-screen menu [PICTURE] to adjust the white level 100 % of the video signal to the 100 % position of the waveform monitor.
Adjusting red, green, and blue
1) Set [COLOR TEMPERATURE] to [USER1] or [USER2] ( page 77).
2) Select "Select line (red)" on the waveform monitor.
3) Adjust dark red areas.
- Use [RED] in [WHITE BALANCE LOW] to adjust the black level 0 % of the video signal to the 0 % position of the waveform monitor.
4) Adjust bright red areas.
- Use [RED] in [WHITE BALANCE HIGH] to adjust the white level 100 % of the video signal to the 100 % position of the waveform monitor.
5) Use the procedure for [RED] to adjust [GREEN] and [BLUE].
Note
- For DVI-D signal, HDMI signal, SDI signal, and DIGITAL LINK signal, confirm that the [SIGNAL LEVEL] setting is correct before adjusting the black level. (SDI signal is supported only for PT-DZ780.)
[CUT OFF]
Each red, green, and blue color component can be removed.
1) Press ▲▼ to select [CUT OFF].
2) Press the button.
•The [CUT OFF] screen is displayed.
3) Press ▲▼ to select [RED], [GREEN], or [BLUE].
4) Press ◀▶ to switch the item.
[OFF] Disables cutoff.
[ON] Enables cutoff.
Note
- When input is switched or a signal is switched, the cutoff setting returns to its original setting (off).
On the menu screen, select [PROJECTOR SETUP] from the main menu, and select an item from the submenu.
Refer to “Navigating through the menu” ( page 71) for the operation of the menu screen.
- After selecting the item, press ▲▼◀▶ to set.
[PROJECTOR ID]
The projector has an ID number setting function that can be used when multiple projectors are used side by side to enable simultaneous control or individual control via a single remote control.
1) Press ▲▼ to select [PROJECTOR ID].
2) Press ◀▶ to switch the item.
- The items will switch each time you press the button.
[ALL] Select this item to control projectors without specifying an ID number.
[1] - [64] Select this item to control individual projector by specifying an ID number.
Note
- To specify an ID number for individual control, the ID number of a remote control must match the ID number of the projector.
- When the ID number is set to [ALL], the projector will operate regardless of the ID number specified during remote control or computer control.
If multiple projectors are set up side by side with IDs set to [ALL], they cannot be controlled separately from the projectors with other ID numbers.
- Refer to "Setting the remote control ID numbers" (→ page 69) for how to set the ID number on the remote control.
[PROJECTION METHOD]
Set the projection method in accordance with the installation status of the projector.
Change the projection method if the screen display is upside down or inverted.
1) Press ▲▼ to select [PROJECTION METHOD].
2) Press the button.
- The [PROJECTION METHOD] screen is displayed.
3) Press ▲▼ to select the projection method.
| [FRONT/FLOOR] When installing the projector on the desk, etc., in front of the screen |
| [FRONT/CEILING] | When installing the projector in front of the screen using the Ceiling Mount Bracket (optional) |
| [REAR/FLOOR] | When installing the projector on the desk, etc., behind the screen (with a translucent screen) |
| [REAR/CEILING] | When installing the projector behind the screen (with a translucent screen) using the Ceiling Mount Bracket (optional) |
4) Press the button.
5) When the confirmation screen is displayed, press ◀▶ to select [OK], and press the button.
Attention
- When the [PROJECTION METHOD] setting is changed, confirm that [COOLING CONDITION] (→ page 112) is set correctly.
[COOLING CONDITION]
Change the fan control depending on the direction of projection.
Set [COOLING CONDITION] according to the projection direction, but set it to [AUTO] normally. Using the projector with [COOLING CONDITION] set incorrectly may shorten the life of the lamp.
![[VERTICAL UP SETTING] [FLOOR SETTING] 30° 30° 30° [CEILING SETTING] [VERTICAL DOWN SETTING] : Projection direction](/content/2026/05/913482/images/5990f567b5af700e541f2deda112fa7100435916085b8dcf0ab8cf68f4bd4c19.jpg)
1) Press ▲▼ to select [COOLING CONDITION].
2) Press the button.
• The [COOLING CONDITION] screen is displayed.
3) Press ▲▼ to select a cooling condition.
- When [AUTO] is selected, the cooling conditions of [FLOOR SETTING], [CEILING SETTING], [VERTICAL UP SETTING], and [VERTICAL DOWN SETTING] are set automatically.
You can check the setting from [COOLING CONDITION] on the [STATUS] screen.
4) Press the button.
5) When the confirmation screen is displayed, press ◀▶ to select [OK], and press the button.
[LAMP SELECT]
Select the lamp to be turned on from the two built-in luminous lamps according to the usage conditions or purposes.
1) Press ▲▼ to select [LAMP SELECT].
2) Press ◀▶ to switch the item.
| [DUAL] Two lamps will light. |
| [SINGLE] One lamp will light. (The lamps with shorter runtime will automatically light.) |
| [LAMP1] Lamp 1 will light. |
| [LAMP2] Lamp 2 will light. |
3) Press the button.
Note
- For a certain time after [LAMP SELECT] is switched, [LAMP SELECT] cannot be switched again, because the lamp replacement cycle will be shortened. Repeatedly switching [LAMP SELECT] in a short time will also shorten the lamp replacement cycle.
•The colors of the items indicate the status.
| Green Current setting |
| Yellow Current setting (when there is a lamp that cannot turn on or failed to turn on) |
| Red Lamp that has failed to turn on |
| White Any other status |
- When [SINGLE], [LAMP1], or [LAMP2] is selected, if the lamp turns off or if the runtime exceeds 4 000 hours (when [LAMP POWER] is set to [NORMAL]), the other lamp turns on. When [DUAL] is selected, if either lamp turns off or if the runtime of either lamp exceeds 4 000 hours (when [LAMP POWER] is set to [NORMAL]), only the other lamp remains on. However, if both lamps turn off or if runtimes of both lamps exceed 4 000 hours (when [LAMP POWER] is set to [NORMAL]), the projector turns into standby.
- Ensure that the lamp unit which is not to be turned on is also installed.
- If the setting is switched to [SINGLE], [LAMP1], or [LAMP2], both lamps turns on temporarily to prevent illuminance reduction.
[LAMP RELAY]
Switch the lamp to be turned on automatically by specifying the day of the week and time.
The degradation of the lamp due to continuous usage can be reduced by automatically switching the lamp to be turned on when using the projector continuously for a week or more.
1) Press ▲▼ to select [LAMP RELAY].
2) Press ◀▶ to switch the item.
| [OFF] Disables lamp relay. |
| [24H] Switches the lamp daily. |
| [1WEEK] Switches the lamp weekly. |
- When [24H] or [1WEEK] is selected, proceed to Step 3).
3) Press ▲▼ to select [TIME].
4) Press the button.
- The projector enters adjustment mode (the display is blinking).
5) Press ◀▶ to select "hour" or "minute", and press ▲▼ or the number (<0> - <9>) buttons to set a time.
- Selecting “hour” allows setting of only the hour in increments of one hour, and selecting “minute” allows setting of only the minute in increments of one minute between 00 and 59.
6) Press the button.
•The adjusted time is set.
- When [1WEEK] is selected in Step 2), proceed to Step 7).
7) Press ▲▼ to select [DAY OF THE WEEK].
8) Press ◀▶ to switch the item.
| [SUNDAY] | Switches the lamp automatically on the set day of the week. |
| [MONDAY] |
| [TUESDAY] |
| [WEDNESDAY] |
| [THURSDAY] |
| [FRIDAY] |
| [SATURDAY] |
Note
- The [LAMP RELAY] function is enabled when [DUAL] or [SINGLE] is selected in [LAMP SELECT].
- When [DUAL] is selected in [LAMP SELECT], only one lights for four hours from the specified time.
- The operating time will be the local time. (→ page 124)
[LAMP POWER]
Switch the brightness of the lamp according to the operating environment of the projector or the purpose.
1) Press ▲▼ to select [LAMP POWER].
2) Press ◀▶ to switch the item.
| [NORMAL] Select this item when high luminance is required. |
| [ECO] Select this item when high luminance is not required. |
Note
- When [ECO] is set, you can reduce power consumption and operation noise, and extend the life of the lamp.
[BRIGHTNESS CONTROL]
The projector is equipped with a luminance sensor to measure brightness and functions to correct screen brightness resulting from changes in lamp brightness.
By using this function, it is possible to reduce changes in overall brightness of the multiple screens due to lamp degradation and suppress variation in brightness to preserve uniformity when constructing multiple screens using multiple projectors.
Setting [BRIGHTNESS CONTROL GAIN]
Adjust the brightness when displaying multiple screens using multiple projectors.
1) Press ▲▼ to select [BRIGHTNESS CONTROL].
2) Press the button.
- The [BRIGHTNESS CONTROL] screen is displayed.
3) Press ▲▼ to select [BRIGHTNESS CONTROL GAIN].
4) Press ◀▶ to adjust.
| Operation | Adjustment | Range of adjustment |
| Brightness | Maximum amount of brightness correction |
| Press ▶. | The screen becomes brighter. | The maximum amount of correction is reduced. | 20% - 100% |
| Press ◀. | The screen becomes darker. | The maximum amount of correction is increased. |
Note
- When using only one projector, the value obtained by subtracting the value of the [BRIGHTNESS CONTROL GAIN] from 100 % is the maximum amount of brightness correction. Brightness cannot be corrected through brightness control since the maximum amount of correction becomes 0 % when [BRIGHTNESS CONTROL GAIN] is at 100 %.
- Luminance will be unsteady for eight minutes after a lamp is turned on. Make adjustments at least eight minutes after starting projection.
- The result of [BRIGHTNESS CONTROL GAIN] adjustments is reflected on all video signals, internal test patterns, and on-screen menus.
- The [BRIGHTNESS CONTROL GAIN] setting is enabled even if [BRIGHTNESS CONTROL SETUP] is [OFF].
Setting [BRIGHTNESS CONTROL SETUP]
Set brightness control operation.
1) Press ▲▼ to select [BRIGHTNESS CONTROL].
2) Press the button.
- The [BRIGHTNESS CONTROL] screen is displayed.
3) Press ▲▼ to select [BRIGHTNESS CONTROL SETUP].
4) Press the button.
- The [BRIGHTNESS CONTROL SETUP] screen is displayed.
5) Press ▲▼ to select [MODE].
6) Press ◀▶ to switch the item.
- The items will switch each time you press the button.
| [OFF] Does not correct the brightness of the screen by the brightness sensor. |
| [AUTO] | Corrects the brightness of the screen by the brightness sensor.Automatically corrects screen brightness when lamp brightness changes. |
| [PC] | Synchronizes nine or more projectors through a computer using the dedicated software “Multi Projector Monitoring & Control SoftwareTM1. |
*1 "Multi Projector Monitoring & Control Software" is included in the supplied CD-ROM.
- When [PC] is selected, proceed to Step 9).
7) Press ▲▼ to select [LINK].
8) Press ◀▶ to switch the item.
- The items will switch each time you press the button.
| [OFF] | Performs corrections by the brightness sensor on one projector without synchronizing with the other projectors.The duration that the constant brightness is kept will become longer by setting the value of [BRIGHTNESS CONTROL GAIN] smaller. |
| [GROUP A][GROUP B][GROUP C][GROUP D] | Synchronizes corrections in multiple projectors by the brightness sensor.You can set up to four groups (A to D) within the same subnet by using the network function.You can also register and synchronize up to eight projectors in one group. |
9) Press ▲▼ to select [CALIBRATION TIME].
- The projector is in the adjustment mode (where the time is blinking).
- Selecting “hour” allows setting of only the hour in increments of one hour, and selecting “minute” allows setting of only the minute in increments of one minute between 00 and 59.
- If you do not specify the time, select [OFF] between 23 and 00 o'clock or between 59 and 00 minutes.
•[CALIBRATION TIME] is set.
- The brightness is measured at the specified time.
13) Press ▲▼ to select [CALIBRATION MESSAGE].
14) Press ◀▶ to switch the item.
- The items will switch each time you press the button.
| [ON] Messages are displayed during calibration. |
| [OFF] Messages are not displayed during calibration. |
15) Press ▲▼ to select [APPLY].
- The set [MODE] and [LINK] are enabled, and the lamp relay screen alert is displayed when the [LAMP RELAY] setting is [OFF]. When [CALIBRATION MESSAGE] is set to [ON], a calibration running message is displayed which will automatically disappear 30 seconds after calibration completes.
- If the button is pressed with [MODE] in [BRIGHTNESS CONTROL SETUP] set to other than [OFF], the brightness of the lamp at the time the button was pressed is recorded as the standard brightness.
- If the button is pressed while [LINK] is set between [GROUP A] and [GROUP D], the group name is displayed on the screens of projectors that have been set in the same group.

Note
- When [MODE] in [BRIGHTNESS CONTROL SETUP] is set to [AUTO] or [PC], keep the shutter function disabled (shutter: open) for at least two minutes to perform the brightness sensor calibration after the [BRIGHTNESS CONTROL SETUP] setting has been completed.
- If the shutter function is enabled (shutter: closed) within approx. 10 minutes after the lamp has turned on while [MODE] in [BRIGHTNESS CONTROL SETUP] is set to [AUTO] or [PC], brightness cannot be measured. Therefore, brightness may be corrected approx. two minutes after the shutter function is disabled (shutter: open).
- When [MODE] in [BRIGHTNESS CONTROL SETUP] is set to [AUTO] or [PC], the lamp brightness is automatically measured eight minutes after the lamp is turned on, and correction is performed so that the screen brightness will be the same as the standard brightness when the brightness control is adjusted. Lamp brightness cannot be measured during the eight minutes after it is turned on because it is not steady.
- If a lamp turns off or lamp relay is performed while [MODE] in [BRIGHTNESS CONTROL SETUP] is set to [AUTO] and when the [PROJECTOR SETUP] menu → [LAMP SELECT] is set to [DUAL], brightness is corrected to the possible extent one minute later.
- When the projector is operating with [MODE] in [BRIGHTNESS CONTROL SETUP] set to [AUTO] and [LINK] set to [OFF], brightness correction is corrected until it reaches the maximum correction value.
- The variation in brightness may increase due to dust accumulating on the lens, screen, or inside the projector, depending on the installation environment of the projector.
-
Adjust brightness control again when lamp degradation causes increased variation in brightness or a lamp is replaced.
-
For continued use longer than 24 hours, set [BRIGHTNESS CONTROL SETUP] to [CALIBRATION TIME], or set [LAMP RELAY] (→ page 113). If it is not set, correction will not be performed automatically.
- The [CALIBRATION TIME] setting will be reflected at the time when you enter the time.
- The [CALIBRATION MESSAGE] setting will be reflected at the time when items are switched using ◀.
Displaying [BRIGHTNESS CONTROL STATUS]
Display the brightness control status.
1) Press ▲▼ to select [BRIGHTNESS CONTROL].
2) Press the button.
• The [BRIGHTNESS CONTROL] screen is displayed.
3) Press ▲▼ to select [BRIGHTNESS CONTROL STATUS].
4) Press the button.
- The [BRIGHTNESS CONTROL STATUS] screen is displayed.
[BRIGHTNESS CONTROL STATUS] screen display example
When [MODE] of [BRIGHTNESS CONTROL SETUP] is set to [OFF]
The screen shows the status that the brightness control is disabled.

When [MODE] of [BRIGHTNESS CONTROL SETUP] is set to [AUTO] and [LINK] is set from [GROUP A] to [GROUP D]
The screen shows the status of the brightness control of synchronized projectors (up to eight units), including the projector being controlled through the on-screen menu.

When [MODE] of [BRIGHTNESS CONTROL SETUP] is set to [AUTO] and [LINK] is set to [OFF]
The screen shows the status of the brightness control in one projector

When [MODE] of [BRIGHTNESS CONTROL SETUP] is set to [PC]

1 Display the name of the projector.
2 Display the synchronized group.
3 Display the IP address of the projector.
4 Display the names and IP addresses of projectors in same group detected over the network.
5 Display the status by color.
Green: There is an allowance for brightness correction.
Yellow: There is little allowance for brightness correction.
Red: There is a brightness control error.
6 Display error detailed messages.
7 Display error messages.
When the message [Failed to apply BRIGHTNESS CONTROL to some projectors.] appears, it means that synchronization with the projector displayed in red has failed.
Press ▲▼ to select the projector displayed in red, and press the button to display the error details.
8 Update to the latest status information.
■Error details
| Error message Measures to take |
| [Exceed maximum number of projectors.] | Limit the number of projectors in one group to eight.When synchronizing nine or more projectors, use the dedicated software “Multi Projector Monitoring & Control Software” ^1 through a computer. |
| [Please check the COMMAND CONTROL setting.] | Set [NETWORK CONTROL] → [COMMAND CONTROL] to [ON] for the projector in error.Set [NETWORK CONTROL] → [COMMAND PORT] of all projectors to be linked to the same value. |
| [Please check the USER NAME and PASSWORD in the COMMAND CONTROL setting.] | Assign the same [User name] and [Password] strings that have web control administrator rights to all projectors to be linked. |
| [Cannot apply BRIGHTNESS CONTROL. Please check projector status.] | The projector is in standby. Switch on the power. |
| [Brightness Sensor Error] | There is a problem with the brightness sensor. If problems persist even after switching on the power, consult your dealer. |
*1 "Multi Projector Monitoring & Control Software" is included in the supplied CD-ROM.
Note
- If the synchronized projectors are not displayed in the list, check the following:
- Are there devices with the same IP address on the network?
- Are the LAN cables connected correctly? (→ page 142)
- Are the subnets of the projectors the same?
- Are the same [LINK] settings applied to a group?
- Refer to [NETWORK SETUP] (→ page 139) or “[Network config] page” (→ page 151) on how to change the projector name.
Brightness control adjustment procedure example
The steps exemplify an adjustment to link the brightness of eight projectors connected in a network.
1) Connect all projectors to the hub using LAN cables. (→ page 142)
2) Switch on all projectors and start projection.
3) Set [LAMP SELECT] to either [DUAL] or [SINGLE] for all projectors.
4) Set [MODE] of [BRIGHTNESS CONTROL SETUP] to [OFF], and select [APPLY], and then press the button.
5) Set [SUBNET MASK] and [IP ADDRESS] in each projector.
- To be able to communicate over the network, set the same value in [SUBNET MASK] for all projectors and set a different value in [IP ADDRESS] for each projector.
6) Wait for at least eight minutes after starting projection until the lamp brightness becomes steady.
7) Set all items in the [PICTURE] menu of all projectors to the same values.
8) Adjust [COLOR MATCHING] to match colors.
9) Display the internal test pattern "All white" in all projectors.
10) Set [BRIGHTNESS CONTROL GAIN] to 100 % in all projectors.
11) Set [BRIGHTNESS CONTROL GAIN] to 90 % in the projector with the least brightness.
12) Adjust [BRIGHTNESS CONTROL GAIN] of each projector.
- Adjust [BRIGHTNESS CONTROL GAIN] of all the other projectors so that the brightness is matched to the projector of which [BRIGHTNESS CONTROL GAIN] is set to 90% .
13) Set [MODE] of [BRIGHTNESS CONTROL SETUP] to [AUTO], and [LINK] to [GROUP A] on all projectors.
14) Select [APPLY] of [BRIGHTNESS CONTROL SETUP] and press the button in all projectors.
- Brightness control starts.
Note
- Brightness is automatically corrected each time the lamp lights when the power is switched on or off.
- Adjust brightness control again when lamp degradation causes increased variation in brightness or the lamp is replaced.
[STANDBY MODE]
Set the power consumption during the standby.
1) Press ▲▼ to select [STANDBY MODE].
2) Press ◀▶ to switch the item.
- The items will switch each time you press the button.
[NORMAL] Select this item to use the network function during standby.
[ECO] Select this item to reduce power consumption during standby.
Note
- When [ECO] is set, the network function, the terminal, and some RS-232C commands become inoperable during standby. In the [NORMAL] setting, the network function and the terminal become operable during standby.
- When [ECO] is set, it may take approximately 10 seconds longer before the projector starts projecting after the power is turned on, compared with when [NORMAL] is set.
- The [STANDBY MODE] settings are not reset to the factory defaults even when [ALL USER DATA] is executed from the [PROJECTOR SETUP] menu → [INITIALIZE] (▶ page 126).
[SCHEDULE]
Set the command execution schedule for each day of the week.
Enabling/disabling the schedule function
1) Press ▲▼ to select [SCHEDULE].
2) Press ◀▶ to switch the item.
- The items will switch each time you press the button.
| [OFF] Disables the schedule function. |
| [ON] | Enables the schedule function. Refer to “How to assign a program” (⇨ page 119) or “How to set a program” (⇨ page 119) for how to set the schedule. |
Note
- When [SCHEDULE] is set to [ON], the [STANDBY MODE] setting is forcibly switched to [NORMAL], and the setting cannot be changed. Even if [SCHEDULE] is then set to [OFF] when in this state, the setting of [STANDBY MODE] remains at [NORMAL].
How to assign a program
1) Press ▲▼ to select [SCHEDULE].
2) Press ◀▶ to select [ON], and press the button.
•The [SCHEDULE] screen is displayed.
3) Select and assign program to each day of week.
- Press ▲▼ to select the day of week, and press ◀▶ to select a program number.
- You can set the program from No.1 to No.7. “--” indicates that the program number has not been set.
How to set a program
Set up to 16 commands to each program.
1) Press ▲▼ to select [SCHEDULE].
2) Press ◀▶ to select [ON], and press the button.
•The [SCHEDULE] screen is displayed.
3) Press ▲▼ to select [PROGRAM EDIT].
4) Press ◀▶ to select a program number, and press the button.
5) Press ▲▼ to select a command number, and press the button.
- You can change the page using ◀▶.
6) Press ▲▼◀▶ to select [TIME], and press the button.
- The projector is in the adjustment mode (where the time is blinking).
7) Press ◀▶ to select "hour" or "minute", and press ▲▼ or the number (<0> - <9>) buttons to set a time, and then press the button.
8) Press ▲▼◀▶ to select [COMMAND].
9) Press the button.
- The [COMMAND] detailed screen is displayed.
10) Press ▲▼ to select a [COMMAND].
- For [COMMAND] which requires detailed settings, the items of the detailed settings will switch each time you press ◀.
- When [INPUT] is selected, press the button, and then press ▲▼◀▶ to select the input to be set.
| [COMMAND] | Detailed settings of [COMMAND] | Description |
| [POWER ON] — Switches on the projector. | |
| [STANDBY] — Enters standby. | |
| [SHUTTER] | [OPEN] Disables the shutter function (shutter: open). |
| [CLOSE] Enables the shutter function (shutter: closed). |
| [INPUT] | [RGB1] Switches the input to RGB1. |
| [RGB2] Switches the input to RGB2. |
| [DVI-D] Switches the input to DVI-D. |
| [HDMI] Switches the input to HDMI. |
| [DIGITAL LINK] Switches the input to DIGITAL LINK. |
| [SDI]*1 | Switches the input to SDI. |
| [INPUT1] - [INPUT10]*2 | Switches the input to DIGITAL LINK, and switches the input of the Panasonic twisted-pair-cable transmitter to the specified input. |
| [LAMP SELECT] | [DUAL] Turns on two lamps. |
| [SINGLE] | Turns on one lamp. (The lamp with shorter runtime will automatically light.) |
| [LAMP POWER] | [NORMAL] Sets the lamp brightness to high luminance. |
| [ECO] Sets the lamp brightness to low luminance. |
| [P IN P] | [OFF] P IN P function is not used. |
| [USER1] Lays out the sub-screen with the settings of [USER1]. |
| [USER2] Lays out the sub-screen with the settings of [USER2]. |
| [USER3] Lays out the sub-screen with the settings of [USER3]. |
*1 Only for PT-DZ780
*2 When the optional DIGITAL LINK output supported device (Model No.: ET-YFB100G, ET-YFB200G) is connected to the projector, its input name is automatically reflected from [INPUT1] to [INPUT10]. If an item where the input name is not reflected is selected, it is disabled.
- The command is fixed and is displayed at the left of the selected command.
- After the command is fixed, press the
Note
- If you attempt to register the setting that would make the lamp turn on for a short time, an error message will be displayed on the screen. Set the time and command again.
- To delete a command the has been already set, press the button on the remote control while the screen in Step 5) is displayed, or select [DELETE] at the screen in Step 6) and press the button.
- If multiple commands have been set for the same time, they are executed in chronological order starting from the smallest command number.
- The operating time will be the local time. (→ page 124)
- If an operation is executed with the remote control or control panel of the projector or with a control command before the command set in [SCHEDULE] is executed, the command set with the schedule function may not be executed.
[INITIAL STARTUP]
Set the startup method when the switch is set to .
1) Press ▲▼ to select [INITIAL STARTUP].
2) Press ◀▶ to switch the item.
- The items will switch each time you press the button.
| [LAST MEMORY] | Starts up the projector in the condition before theswitch is set to. |
| [STANDBY] | Starts up the projector in standby. |
| [ON] | Starts up projecting immediately. |
Set the input when the projector is switched on to start projection.
1) Press ▲▼ to select [STARTUP INPUT SELECT].
2) Press the button.
- The [STARTUP INPUT SELECT] screen is displayed.
120 - ENGLISH
3) Press ▲▼◀▶ to select an item.
| [LAST USED] Keeps the input selected last. |
| [RGB1] Sets the input to RGB1. |
| [RGB2] Sets the input to RGB2. |
| [DVI-D] Sets the input to DVI-D. |
| [HDMI] Sets the input to HDMI. |
| [DIGITAL LINK] Sets the input to DIGITAL LINK. |
| [SDI] ^1 | Sets the input to SDI. |
| [INPUT1] - [INPUT10] ^2 | Sets the input to DIGITAL LINK, and switches the input of Panasonic twisted-pair-cable transmitter to the specified input. |
*1 Only for PT-DZ780
*2 When the optional DIGITAL LINK output supported device (Model No.: ET-YFB100G, ET-YFB200G) is connected to the projector, its input name is automatically reflected from [INPUT1] to [INPUT10]. If an item where the input name is not reflected is selected, it is disabled.
Note
- When [BACKUP INPUT MODE] in the [DISPLAY OPTION] menu → [BACKUP INPUT SETTING] (→ page 97) has been set to [ON], and the projector has been turned off with the input set to HDMI, projection will start with the DVI-D input, even when [STARTUP INPUT SELECT] is set to [LAST USED].
[RS-232C]
Set the communication conditions of the / terminals. Refer to "/ terminal" (→ page 180).
Setting the communication condition of the terminal
1) Press ▲▼ to select [RS-232C].
2) Press the button.
•The [RS-232C] screen is displayed.
3) Press ▲▼ to select [INPUT SELECT].
4) Press ◀▶ to switch the item.
| [PROJECTOR] | Use theterminal of the projector to perform RS-232C communication. |
| [DIGITAL LINK] | Performs RS-232C communication via the DIGITAL LINK output supported device (Model No.: ET-YFB100G, ET-YFB200G) and theterminal. |
5) Press ▲▼ to select [(IN) BAUDRATE].
6) Press ◀▶ to switch the item.
- The items will switch each time you press the button.
| [9600] | Select the proper speed.[19200] |
|
| [38400] |
7) Press ▲▼ to select [(IN) PARITY].
8) Press ◀▶ to switch the item.
- The items will switch each time you press the button.
| [NONE] | Select the parity condition.[EVEN] |
|
| [ODD] |
Setting the communication condition of the terminal
1) Press ▲▼ to select [RS-232C].
2) Press the button.
•The [RS-232C] screen is displayed.
3) Press ▲▼ to select [(OUT) BAUDRATE].
4) Press ◀▶ to switch the item.
| [9600] | Select the proper speed.[19200] |
|
| [38400] |
5) Press ▲▼ to select [(OUT) PARITY].
6) Press ◀▶ to switch the item.
- The items will switch each time you press the button.
| [NONE] | Select the parity condition.[EVEN] |
|
| [ODD] |
Setting the response
1) Press ▲▼ to select [RS-232C].
2) Press the button.
•The [RS-232C] screen is displayed.
3) Press ▲▼ to select [RESPONSE(ID ALL)].
4) Press ◀▶ to switch the item.
| [ON] Returns the response when the ID setting is ALL. |
| [OFF] Does not return the response when the ID setting is ALL. |
5) Press ▲▼ to select [GROUP].
6) Press ◀▶ to switch the item.
| [A] - [Z] | Controls multiple projectors simultaneously by sending the ID of RS-232C. You can set groups from [A] to [Z]. The projector responds when the ID of RS-232C matches the setting. |
7) Press ▲▼ to select [RESPONSE(ID GROUP)].
8) Press ◀▶ to switch the item.
| [ON] Returns the response when the ID setting is GROUP. |
| [OFF] Does not return the response when the ID setting is GROUP. |
Note
- When [INPUT SELECT] is set to [DIGITAL LINK], communication using that serial terminal is available only when the corresponding device (such as the optional DIGITAL LINK output supported device (Model No.: ET-YFB100G, ET-YFB200G)) is connected to the terminal.
- When transferring logos via the optional DIGITAL LINK output supported device (Model No.: ET-YFB100G, ET-YFB200G), setting for "NO SIGNAL SLEEP" of the DIGITAL LINK output supported device should be set to "OFF" to avoid interruption of communication.
- When [INPUT SELECT] is set to [DIGITAL LINK], communication speed is fixed to 9 600 bps.
[STATUS]
Display the status of the projector.
1) Press ▲▼ to select [STATUS].
2) Press the button.
- The [STATUS] screen is displayed.
122 - ENGLISH
3) Press ◀▶ to switch the pages.
- The page will change each time you press the button.
| [PROJECTOR TYPE] Displays the projector type and serial number of the projector. |
| [PROJECTOR RUNTIME] Displays the runtime of the projector. |
| [LAMP1]*3 | Displays the runtime and status of the lamp 1. |
| [LAMP2]*3 | Displays the runtime and status of the lamp 2. |
| [MAIN/SUB VERSION] Displays the main and sub versions of the firmware of the projector. |
| [INTAKE AIR TEMP.]*1 | Displays the status of the intake air temperature of the projector. |
| [OPTICS MODULE TEMP.]*1 | Displays the status of the internal temperature of the projector. |
| [EXHAUST AIR TEMP.]*1 | Displays the status of the exhaust air temperature of the projector. |
| [COOLING CONDITION] | Displays the set cooling conditions. When [AUTO] is set, automatically recognized result is displayed. |
| [ATMOSPHERIC PRESSURE] Displays the atmospheric pressure. |
| [SELF TEST] Displays the status of the projector. |
| [INPUT] Displays the input terminal currently selected. |
| [BACKUP INPUT STATUS] Displays the backup status. |
| [SIGNAL NAME] Displays the input signal name. |
| [SIGNAL FREQUENCY] Displays the frequency of the input signal. |
| [NUMBER OF REGISTERED SIGNAL] | Displays the number of registered signals. |
| [REMOTE2 STATUS] | Displays the control status of the REMOTE2. |
| [AC VOLTAGE] | Displays the status of the AC voltage. |
| [LAMP UNIT MODEL NO.] | Displays the model no. of the lamp unit. |
| [LAMP1 SERIAL NUMBER] | Displays the serial number of the lamp 1. |
| [LAMP2 SERIAL NUMBER] | Displays the serial number of the lamp 2. |
| [UPGRADE]*2 | [ET-UK20] | Displays the activation status based on the Upgrade Kit (Model No.: ET-UK20). |
| [ET-CUK10] | Displays the activation status based on the Auto Screen Adjustment Upgrade Kit (Model No.: ET-CUK10). |
| [ON COUNT] | [POWER ON TIMES] | Displays the number of times the power is turned on. |
| [LAMP1 ON] | Displays the number of times the lamp is turned on. |
| [LAMP2 ON] |
| [SHUTTER] | Displays the number of times the shutter is closed. |
| [LAMP1] | Displays the runtime in detail. |
| [LAMP2] | Displays the runtime in detail. |
| [SIGNAL INFORMATION] | [MEMORY NO.] | Displays the memory number of the input signal. |
| [INPUT] Displays the input terminal currently selected. |
| [SIGNAL NAME] Displays the input signal name. |
| [SIGNAL FREQUENCY] Displays the frequency of the input signal. |
| [SYNC.STATE] | Displays the synch polarity of the input signal. |
| [V.SYNC WIDTH] | Displays the vertical sync signal pulse width of the input signal. |
| [SCAN TYPE] | Displays the scan type of the input signal. |
| [TOTAL DOTS] | Displays the total dot count of the input signal. |
| [DISPLAY DOTS] | Displays the number of input signal display dots. |
| [TOTAL LINES] | Displays the total line count of the input signal. |
| [DISPLAY LINES] | Displays the number of input signal display lines. |
| [SAMPLING] | Displays the sampling information of the input signal. |
| [SIGNAL LEVEL] | Displays the signal level of the input signal. |
| [BIT DEPTH]*2 | Displays the gradation of the input signal. |
*1 The temperature status is indicated with text color (green/yellow/red) and bar scale. Use the projector within the range that the indication is green.
*2 Only for PT-DZ780
*3 The lamp runtime to be displayed is real time. The following conversion is required to calculate the rough estimate for lamp replacement.
| Formula for lamp replacement time (rough estimate) |
| (A × 6 + B × 4) ÷ 6 A: Runtime when [LAMP POWER] is set to [NORMAL] B: Runtime when [LAMP POWER] is set to [ECO] |
Note
- E-mail including the content of status can be sent to the E-mail addresses (up to two addresses) set in "[E-mail set up] page" (→ page 153) by pressing the button while displaying the [STATUS] screen.
- Some items in [SIGNAL INFORMATION] may be displayed and others not displayed, depending on the signal being input.
- If any abnormality has occurred on the projector, pressing the button while the [STATUS] screen is displayed shows the detail screen of the error information.
- For details on the contents displayed in [SELF TEST], refer to “[SELF TEST] indications” (→ page 171).
[NO SIGNAL SHUT-OFF]
A function that automatically switches the power source of the projector to standby if there is no input signal for a certain period of time. The time before switching to standby can be set.
1) Press ▲▼ to select [NO SIGNAL SHUT-OFF].
2) Press ◀▶ to switch the item.
- The items will switch each time you press the button.
[DISABLE] Disables the No signal shut-off function.
[10MIN.] - [90MIN.] Sets the time in increments of 10 minutes.
[REMOTE2 MODE]
You can set the terminal.
1) Press ▲▼ to select [REMOTE2 MODE].
2) Press ◀▶ to switch the item.
- The items will switch each time you press the button.
| [DEFAULT] | The pin assignment of theterminal is used by the factory default setting of the projector. |
| [USER] | Used to change the setting of theterminal. (→ page 184) |
| [L6500 SERIES] | The setting ofterminal is used for the L6500 series compatibility. |
- When [USER] is selected, proceed to Step 3).
3) Press the button.
4) Press ▲▼ to select one from [PIN2] to [PIN8], and press ◀▶ to switch the setting.
Set the functions of the button on the remote control.
1) Press ▲▼ to select [FUNCTION BUTTON].
2) Press the button.
- The [FUNCTION BUTTON] screen is displayed.
3) Press ▲▼ to select a function.
| [DISABLE] Disables thebutton. |
| [P IN P] | Switches the [P IN P] setting to [OFF], [USER1], [USER2], or [USER3]. (→ page 128) |
| [SUB MEMORY] | Displays the sub memory list. (→ page 133) |
| [SYSTEM SELECTOR] | Switches the [SYSTEM SELECTOR] setting. (→ page 81) |
| [SYSTEM DAYLIGHT VIEW] | Switches the [SYSTEM DAYLIGHT VIEW] setting. (→ page 80) |
| [FREEZE] | Freezes the image temporarily. (→ page 108) |
| [WAVEFORM MONITOR] | Displays the waveform of the input signal. (→ page 108) |
| [ASPECT] | Switches the aspect setting. (→ page 83) |
4) Press the button.
[DATE AND TIME]
Set the time zone, date, and time of the built-in clock of the projector.
Setting the time zone
1) Press ▲▼ to select [DATE AND TIME].
2) Press the button.
- The [DATE AND TIME] screen is displayed.
3) Press ▲▼ to select [TIME ZONE].
4) Press ◀▶ to switch [TIME ZONE].
Setting the date and time manually
1) Press ▲▼ to select [DATE AND TIME].
2) Press the button.
- The [DATE AND TIME] screen is displayed.
3) Press ▲▼ to select [ADJUST CLOCK].
4) Press the button.
•The [ADJUST CLOCK] screen is displayed.
5) Press ▲▼ to select an item, and press ◀▶ to set the local date and time.
6) Press ▲▼ to select [APPLY], and press the button.
- The setting of the date and time will be completed.
Setting the date and time automatically
1) Press ▲▼ to select [DATE AND TIME].
2) Press the button.
- The [DATE AND TIME] screen is displayed.
3) Press ▲▼ to select [ADJUST CLOCK].
4) Press the button.
•The [ADJUST CLOCK] screen is displayed.
5) Press ▲▼ to select [NTP SYNCHRONIZATION], and press ◀▶ to change the setting to [ON].
6) Press ▲▼ to select [APPLY], and press the button.
- The setting of the date and time will be completed.
Note
- To set the date and time automatically, the projector must be connected to the network.
- If synchronization with the NTP server fails just after [NTP SYNCHRONIZATION] is turned [ON], [NTP SYNCHRONIZATION] will return to [OFF]. Also if [NTP SYNCHRONIZATION] is turned [ON] while the NTP server is not set, [NTP SYNCHRONIZATION] will return to [OFF].
- Access the projector via a web browser to set the NTP server. Refer to “[Adjust clock] page” (→ page 152) for details.
- If [ALL USER DATA] in the [PROJECTOR SETUP] menu → [INITIALIZE] (→ page 126) is executed, [TIME ZONE] settings are reset to the factory defaults. However, the date and time based on the local date and time setting (Coordinated Universal Time, UTC, Universal Time, Coordinated) will be maintained without being initialized.
[LENS CALIBRATION]
Detect the lens shift limit value of the projector and set the home position and the ET-DLE030 standard lens position automatically.
1) Press ▲▼ to select [LENS CALIBRATION].
2) Press ◀▶ to switch the item.
- The items will switch each time you press the button.
[NORMAL]
Select this item when anything other than the fixed-focus lens (Model No.: ET-DLE030) is used. Move the lens to the home position after completing the calibration.
[DLE030]
Select this item when the fixed-focus lens (Model No.: ET-DLE030) is used. Move the lens to the ET-DLE030 standard lens position after completing the calibration.
3) Press the button.
•The confirmation screen is displayed.
4) Press ◀▶ to select [OK], and press the button.
•To cancel, select [CANCEL].
- The lens moves up, down, left, and right to automatically detect the lens shift limit value, and automatically set the home position and the ET-DLE030 standard lens position.
- The lens stops to complete the calibration.
Note
- [PROGRESS] is displayed on the menu during lens calibration. Cannot cancel mid-operation.
- When lens calibration executes correctly, [COMPLETE] is displayed and [INCOMPLETE] is displayed when it does not execute correctly.
[SAVE ALL USER DATA]
Save the various setting values as a backup in the built-in memory of the projector.
1) Press ▲▼ to select [SAVE ALL USER DATA].
2) Press the button.
- The [SECURITY PASSWORD] screen is displayed.
3) Enter a security password and press the button.
4) When the confirmation screen is displayed, press ◀▶ to select [OK], and press the button.
•[PROGRESS] is displayed while saving data.
Note
- Data set from the computer application is not included in [ALL USER DATA].
[LOAD ALL USER DATA]
Load the various setting values saved as a backup in the built-in memory of the projector.
1) Press ▲▼ to select [LOAD ALL USER DATA].
2) Press the button.
- The [SECURITY PASSWORD] screen is displayed.
3) Enter a security password and press the button.
4) When the confirmation screen is displayed, press ◀▶ to select [OK], and press the button.
Note
- The projector enters the standby mode to reflect the setting values when [LOAD ALL USER DATA] is executed.
- Data registered from a computer is not included in [ALL USER DATA].
[INITIALIZE]
Return various setting values to their factory default settings.
1) Press ▲▼ to select [INITIALIZE].
2) Press the button.
- The [SECURITY PASSWORD] screen is displayed.
3) Enter a security password and press the button.
- The [INITIALIZE] screen is displayed.
4) Press ▲▼ to select an item to initialize.
[ALL USER DATA]
Returns all setting values including [REGISTERED SIGNAL], [NETWORK SETUP], [E-mail set up], and [USER LOGO] to the factory default settings.
The projector enters the standby mode to reflect the setting values.
Chapter 4 Settings — [PROJECTOR SETUP] menu
| [REGISTERED SIGNAL] | Deletes all the setting values saved for each input signal.To delete only a part of a registered signal, perform the procedure described in “Deleting the registered signal” (→ page 131). |
| [NETWORK/E-MAIL] Returns | [NETWORK SETUP] and [E-mail set up] to factory default settings. |
| [LOGO IMAGE] Deletes | the image registered in [USER LOGO]. |
5) Press the button.
6) When the confirmation screen is displayed, press ◀▶ to select [OK], and press the button.
Note
- Even when [ALL USER DATA] is executed, the [UNIFORMITY] and [STANDBY MODE] settings are not initialized.
[SERVICE PASSWORD]
This function is used by a service person.
On the menu screen, select [P IN P] from the main menu, and select an item from the sub-menu. Refer to “Navigating through the menu” ( page 71) for the operation of the menu screen.
- After selecting the item, press ▲▼◀▶ to set.
Using P IN P function
Locate a separate, small sub screen in the main screen to project two images simultaneously.
1) Press ▲▼ to select [P IN P MODE].
2) Press the button.
- The [P IN P MODE] screen is displayed.
3) Press ▲▼ to select a function.
| [OFF] P IN P function is not used. |
| [USER1] | The items set in “Setting P IN P function” (→ page 128) are used in P IN P function. |
| [USER2] |
| [USER3] |
4) Press the button.
Setting P IN P function
P IN P function settings can be saved to [USER1], [USER2], and [USER3].
1) Press ▲▼ to select [P IN P MODE].
2) Press the button.
- The [P IN P MODE] screen is displayed.
3) Press ▲▼ to select the desired mode from [USER1], [USER2], and [USER3], and press the button.
4) Press ▲▼ to select [MAIN WINDOW] or [SUB WINDOW], and press the button.
5) Press ▲▼ to select the input terminal to be displayed in the window, and press the button.
6) Press ▲▼ to select an item.
| [SIZE] Set the window display size between 10 % and 100 %. |
| [POSITION] Set the display position of the window within the screen. |
| [CLOCK PHASE] | When the sub window is input from theterminal or theterminal and a flickering image or smeared outline appears, set between 0 and +31. |
7) If [SIZE] is selected in Step 6), press the button.
•The sub-menu is displayed.
8) Press ▲▼ to select an item.
9) Press ◀▶ to make adjustment, and press the
- The P IN P function may not be available for some signals being input or terminals being selected. Refer to "Two-window display combination list" ( page 185) for details.
- The main window setting values are applied to image adjustment values such as [PICTURE MODE], [GAMMA], and [COLOR TEMPERATURE].
- While in the normal screen (where no menu is displayed), press ◀▶ to switch the sizes and positions of the main window and sub window while P IN P is operating.
- When [FRAME RESPONSE] is set to other than [NORMAL], [P IN P] cannot be set.
- The combination of DIGITAL LINK and other input cannot be displayed in P IN P.
- When [BACKUP INPUT MODE] is set to [ON], [P IN P] cannot be set.
On the menu screen, select [TEST PATTERN] from the main menu.
Refer to "Navigating through the menu" (→ page 71) for the operation of the menu screen.
- Press ◀▶ to switch.
[TEST PATTERN]
Display the test pattern built-in to the projector.
Settings of position, size, and other factors will not be reflected in test patterns. Make sure to display the input signal before performing various adjustments.
1) Press ◀▶ to switch the [TEST PATTERN] item.
- The items will switch each time you press the button.
| Menu screen + All white | Displays test patterns with the menu screen. Select a test pattern so that it is easy to make various adjustments. |
| Menu screen + All black |
| Menu screen + Window |
| Menu screen + Window (inversion) |
| Menu screen + Color bar (vertical) |
| Menu screen + Color bar (horizontal) |
| Menu screen + 16:9/4:3 aspect frame |
| Menu screen + Focus |
| Menu screen + Entry screen | Displays the menu screen and input signal.Built-in test patterns are not displayed. |
Note
- Press the button on the remote control while the test pattern is displayed to hide the menu screen.
Changing color or a focus test pattern
When the "Menu Screen + Focus" test pattern is displayed, the color can be changed.
1) Press ◀▶ to select the "Menu Screen + Focus" test pattern.
2) Press the button.
- The [TEST PATTERN COLOR] screen is displayed.
3) Press ▲▼ to select a color, and press the button.
- The test pattern color changed to the color selected.
Note
- The test pattern color settings return to [WHITE] when the projector is switched off.
- Colors of the test patterns other than focus test patterns cannot be changed.
On the menu screen, select [SIGNAL LIST] from the main menu.
Refer to “Navigating through the menu” ( page 71) for the operation of the menu screen.
■Registered signal details
Memory number: A1 (1-2)
![PANASONIC ET-LAD70W - [SIGNAL LIST] menu - 1](/content/2026/05/913482/images/0a9a87687165292d5ef11ccef81c822840bf22744262607052ead104fef3cff1.jpg)
When the signal of the address number (A1, A2, ...L7, L8) is registered
- A name can be set for each sub memory (→ page 133).
Registering new signals
After a new signal is input and the
button on the remote control or the control panel is pressed, the registration is completed and the [MAIN MENU] screen is displayed.
Note
- Up to 96 signals, including sub memories, can be registered to the projector.
- There are 12 pages (eight memories each for A through L, with eight memories possible on each page) for memory numbers, and the signal is registered to the lowest number that is available. If there is no available memory space, it will be overwritten from the oldest signal.
- The names to be registered are automatically determined by the input signals and memory numbers.
- If a menu is being displayed, the new signals will be registered at the instant they are input.
Renaming the registered signal
Registered signals can be renamed.
1) Press ▲▼◀▶ to select the signal of which name is to be changed.
2) Press the button.
- The [REGISTERED SIGNAL STATUS] screen is displayed.
- The memory number, input terminal, input signal name, frequency, synch polarity, etc., are displayed.
- Press the button to return to the [SIGNAL LIST] screen.
3) Press the button.
- The [REGISTERED SIGNAL SETUP] screen is displayed.
4) Press ▲▼ to select [SIGNAL NAME CHANGE].
5) Press the button.
- The [SIGNAL NAME CHANGE] screen is displayed.
6) Press ▲▼◀▶ to select the text, and press the button to enter the text.
7) After the name is changed, press ▲▼◀▶ to select [OK], and press the button.
- The registration is completed and the [REGISTERED SIGNAL SETUP] screen returns.
- When pressing ▲▼◀▶ to select [CANCEL] and pressing the button, the changed signal name will not be registered and an automatically registered signal name will be used.
Deleting the registered signal
Registered signals can be deleted.
1) Press ▲▼◀▶ to select the signal to delete.
2) Press the button on the remote control.
- The [REGISTERED SIGNAL DELETE] screen is displayed.
- To cancel the deletion, press the button to return to the [REGISTERED SIGNAL LIST] screen.
3) Press the button.
•The selected signal will be deleted.
Note
- A registered signal can also be deleted from [REGISTERED SIGNAL DELETE] on the [REGISTERED SIGNAL SETUP] screen.
Protecting the registered signal
1) Press ▲▼◀▶ to select the signal to protect.
2) Press the button.
- The [REGISTERED SIGNAL STATUS] screen is displayed.
3) Press the button.
- The [REGISTERED SIGNAL SETUP] screen is displayed.
4) Press ▲▼ to select [LOCK].
5) Press ◀▶ to switch the item.
- The items will switch each time you press the button.
[OFF] The signal is not protected.
[ON] The signal is protected.
Note
- When [LOCK] is set to [ON], signal deletion, image adjustment, and automatic setup are not available. To perform these operations, set [LOCK] to [OFF].
- A signal can be registered to the sub memory even if it is protected.
- Even a protected signal will be deleted if [INITIALIZE] is executed.
Expanding signal lock-in range
1) Press ▲▼◀▶ to select the signal to set.
2) Press the button.
- The [REGISTERED SIGNAL STATUS] screen is displayed.
3) Press the button.
- The [REGISTERED SIGNAL SETUP] screen is displayed.
4) Press ▲▼ to select [LOCK-IN RANGE].
5) Press ◀▶ to switch the item.
- The items will switch each time you press the button.
[NARROW] Select this item usually.
[WIDE] Widens the lock-in range.
Note
- Switch the range that determines that a signal to be input is the same signal that is already registered.
- To prioritize the determination that it is the same signal that is already registered, set to the [WIDE] setting.
- Use in cases such as when the synchronizing frequency of a signal to be input has changed slightly, or multiple signal lists are registered.
- Available only when a signal is input from the terminal, terminal, terminal, terminal, or terminal.
- When [WIDE] is set, the image may be distorted because a signal is recognized as the same even if its synchronizing frequency varies slightly.
- When a signal to be input corresponds to multiple signals set in [WIDE], a registered signal with a larger memory number receives priority. Example: a signal to be input that corresponds to memory numbers A2, A4, and B1 will be determined to be B1.
- When a registration signal is deleted, the settings are also deleted.
- In an environment where multiple types of signals are input to the same terminal, signals are sometimes not determined correctly when the setting is set to [WIDE].
Sub memory
The projector has a sub memory function that can register the multiple image adjustment data, even if it is recognized as the same signal by the frequency or format of the synchronization signal source. Use this function when you need to adjust the picture quality such as switching of the aspect ratio or white balance by the same synchronization signal source. The sub memory includes all the data that can be adjusted for each signal, such as the image aspect ratio and data adjusted in the [PICTURE] item ([CONTRAST], [BRIGHTNESS], etc.).
Registering to the sub memory
1) Press ◀▶ on the normal screen (when the menu is not displayed).
- The sub memory registration screen is displayed if the sub memory is not registered. Proceed to Step 3).
- A list of sub memories registered to the signal currently input is displayed.
- By selecting [SUB MEMORY] from the [PROJECTOR SETUP] menu → [FUNCTION BUTTON], the button on the remote control can be used instead of ◀.
2) Press ▲▼◀▶ to select the sub memory number to register in [SUB MEMORY LIST].
3) Press the button.
- The [SIGNAL NAME CHANGE] screen is displayed.
4) Press ▲▼◀▶ to select [OK], and press the button.
- To rename the registered signal, follow the procedure in Steps 6) and 7) in "Renaming the registered signal" (→ page 131).
Switching to the sub memory
1) Press ◀▶ on the normal screen (when the menu is not displayed).
- A list of sub memories registered to the signal currently input is displayed.
2) Press ▲▼◀▶ to select the signal to switch in [SUB MEMORY LIST].
3) Press the button.
- This switches to the signal selected in Step 2).
Deleting the sub memory
1) Press ◀▶ on the normal screen (when the menu is not displayed).
- The [SUB MEMORY LIST] screen is displayed.
2) Press ▲▼◀▶ to select the sub memory to be deleted, and press the button on the remote control.
- The [REGISTERED SIGNAL DELETE] screen is displayed.
- To cancel the deletion, press the button to return to the [SUB MEMORY LIST] screen.
3) Press the button.
•The selected sub memory will be deleted.
On the menu screen, select [SECURITY] from the main menu, and select an item from the sub-menu. Refer to “Navigating through the menu” (→ page 71) for the operation of the menu screen.
- When the projector is used for the first time
Initial password: Press ▲▶▼◀▲▶▼◀ in order, and press the button.
• After selecting the item, press ▲▼◀▶ to set.
Attention
- When you select the [SECURITY] menu and press the button, entering a password is required. Enter the preset password and then continue operations of the [SECURITY] menu.
- When the password has been changed previously, enter the changed password, and press the button.
Note
- The entered password is displayed with*marks on the screen.
- An error message is displayed on the screen when the entered password is incorrect. Re-enter the correct password.
[SECURITY PASSWORD]
Display the [SECURITY PASSWORD] screen when the power is turned on with the switch set to the side. When the entered password is incorrect, the operation will be restricted to the power standby <∅> button, the button, and the (, , ) buttons.
1) Press ▲▼ to select [SECURITY PASSWORD].
2) Press ◀▶ to switch the item.
- The items will switch each time you press the button.
[OFF] Disables the security password entry.
[ON] Enables the security password entry.
Note
- The [SECURITY PASSWORD] setting is set to [OFF] by the factory default or when [ALL USER DATA] in [INITIALIZE] (→ page 126) is executed.
- Change the password periodically that is hard to guess.
- The security password is enabled after setting [SECURITY PASSWORD] to [ON] and turning the switch to .
[SECURITY PASSWORD CHANGE]
Change the security password.
1) Press ▲▼ to select [SECURITY PASSWORD CHANGE].
2) Press the button.
- The [SECURITY PASSWORD CHANGE] screen is displayed.
3) Press ▲▼◀▶ and the number (<0> - <9>) buttons to set the password.
- Up to eight button operations can be set.
4) Press the button.
5) Re-enter the password for the confirmation.
6) Press the button.
Note
- The entered password is displayed with*marks on the screen.
- When numerical values are used for the security password, the security password is required to be initialized if the remote control is lost. Consult your dealer for the method of initialization.
[DISPLAY SETTING]
Overlap the security message (text or image) over the projecting image.
1) Press ▲▼ to select [DISPLAY SETTING].
2) Press ◀▶ to switch the item.
- The items will switch each time you press the button.
| [OFF] Hides the security message. |
| [TEXT] | Displays the text set in the [SECURITY] menu → [TEXT CHANGE]. |
| [USER LOGO] Displays | the image registered by the user. |
Note
- To create/register the [USER LOGO] image, use "Logo Transfer Software" included in the supplied CD-ROM.
[TEXT CHANGE]
Edit the text to be displayed when [TEXT] is selected in [DISPLAY SETTING].
1) Press ▲▼ to select [TEXT CHANGE].
2) Press the button.
•The [TEXT CHANGE] screen is displayed.
3) Press ▲▼◀▶ to select the text, and press the button to enter the text.
4) Press ▲▼◀▶ to select [OK], and press the button.
•The text is changed.
[CONTROL DEVICE SETUP]
Enable/disable the button operations on the control panel and the remote control.
1) Press ▲▼ to select [CONTROL DEVICE SETUP].
2) Press the button.
- The [CONTROL DEVICE SETUP] screen is displayed.
3) Press ▲▼ to select [CONTROL PANEL] or [REMOTE CONTROL].
| [CONTROL PANEL] You can set the limitation on the control from the control panel. |
| [REMOTE CONTROL] You can set the limitation on the control from the remote control. |
4) Press the button.
- The [CONTROL PANEL] screen or the [REMOTE CONTROL] screen is displayed.
5) Press ▲▼ to select [CONTROL PANEL] or [REMOTE CONTROL].
6) Press ◀▶ to switch the item.
- You can set the operation restriction from the control panel or the remote control.
| [ENABLE] Enables all | button operations. |
| [DISABLE] Disables all | button operations. |
| [USER] | Operation of all buttons can be enabled/disabled separately.Refer to “Enabling/disabling any button” (⇨ page 135) for details. |
7) Press ▲▼ to select [APPLY], and press the button.
•The confirmation screen is displayed.
8) Press ◀▶ to select [OK], and press the button.
1) Press ▲▼ to select [CONTROL DEVICE SETUP].
2) Press the button.
- The [CONTROL DEVICE SETUP] screen is displayed.
3) Press ▲▼ to select [CONTROL PANEL] or [REMOTE CONTROL].
4) Press the button.
5) Press ▲▼ to select [CONTROL PANEL] or [REMOTE CONTROL].
6) Press ◀▶ to switch [USER].
7) Press ▲▼ to select the button item to set.
- When [INPUT SELECT BUTTON] is selected, press the button, and then press ▲▼ to select the button to set.
| Buttons that can be set |
| [CONTROL PANEL] [REMOTE CONTROL] |
| [POWER BUTTON] | Power standby <∅> button, power on <|> button |
| [INPUT SELECT BUTTON] | button,button,button,button,button*1 | button,button,button,button*1 |
| [MENU BUTTON]button |
| [LENS BUTTON]button Lens (,,) button |
| [AUTO SETUP BUTTON]button |
| [SHUTTER BUTTON]button |
| [ON SCREEN BUTTON] —button | |
| [OTHER BUTTON]▲▼◀▶,button | Buttons not listed above |
*1 SDI input is supported only for PT-DZ780.
8) Press ◀▶ to switch the item.
| [ENABLE] Enables button operations. |
| [DISABLE] Disables button operations. |
- The following items are available only when [RGB1/2 BUTTON] of [INPUT SELECT BUTTON] is selected.
| [TOGGLE] | Switches between [RGB1] and [RGB2] when the button is operated. |
| [RGB1] | Fixes to [RGB1]. |
| [RGB2] | Fixes to [RGB2]. |
| [DISABLE] Disables button operations. |
- The following items are available only when [VIDEO BUTTON] of [INPUT SELECT BUTTON] is selected.
| [DISABLE] Disables button operations. |
| [VIDEO] | Fixes to [VIDEO]. |
| [Y/C] | Fixes to [Y/C]. |
| [TOGGLE] | Switches between [VIDEO] and [Y/C] when the button is operated. |
- When [INPUT SELECT BUTTON] is selected in Step 7), after the item is switched, press the
button to return to the [CONTROL PANEL] screen or the [REMOTE CONTROL] screen.
9) Press ▲▼ to select [APPLY], and press the button.
•The confirmation screen is displayed.
10) Press ◀▶ to select [OK], and press the button.
Note
- When a button operation is performed on the device set to [DISABLE], the [CONTROL DEVICE PASSWORD] screen is displayed. Enter the control device password.
- The [CONTROL DEVICE PASSWORD] screen will disappear when there is no operation for approx. 10 seconds.
- If the operations of both [CONTROL PANEL] and [REMOTE CONTROL] are set to [DISABLE], the projector cannot be turned off (cannot enter standby).
- When the setting has completed, the menu screen will disappear. To operate continuously, press the button to display the main menu.
- Even when button operation on the remote control is disabled, operation of the button on the remote control is enabled.
[CONTROL DEVICE PASSWORD CHANGE]
The control device password can be changed.
1) Press ▲▼ to select [CONTROL DEVICE PASSWORD CHANGE].
2) Press the button.
- The [CONTROL DEVICE PASSWORD CHANGE] screen is displayed.
3) Press ▲▼◀▶ to select the text, and press the button to enter the text.
4) Press ▲▼◀▶ to select [OK], and press the button.
• To cancel, select [CANCEL].
Attention
- The initial password is "AAAA" by the factory default or when [ALL USER DATA] in [INITIALIZE] (→ page 126) is executed.
- Change the password periodically that is hard to guess.
On the menu screen, select [NETWORK] from the main menu, and select an item from the sub-menu. Refer to “Navigating through the menu” (→ page 71) for the operation of the menu screen.
- After selecting the item, press ▲▼◀▶ to set.
[DIGITAL LINK MODE]
Switch the communication method of the terminal of the projector.
1) Press ▲▼ to select [DIGITAL LINK MODE].
2) Press ◀▶ to switch the item.
- The items will switch each time you press the button.
| [AUTO] | Switches the communication method automatically to DIGITAL LINK, long reach, or Ethernet. |
| [DIGITAL LINK] Fixes the communication method to DIGITAL LINK. |
| [LONG REACH] Fixes the communication method to long reach. |
| [ETHERNET] Fixes the communication method to Ethernet. |
Possible communication modes
√: Communication possible
—: Communication not possible
| Setting | Communication possible |
| Video transfer (100 m (328'1")) | Video transfer (150 m (492'2")) | Ethernet RS-232C |
| [AUTO] | For DIGITAL LINK | √ | — | √ | √ |
| For long reach — | | √√√ | | |
| For Ethernet — — | | | √ | — |
| [DIGITAL LINK] | √ | — | √ | √ |
| [LONG REACH] — | | √√√ | | |
| [ETHERNET] — — | | | √ | — |
Note
- The maximum transmission distance when connected with the long-reach communication method is 150 m (492'2"). However, the signal that the projector can receive is only up to 1080/60p (148.5 MHz).
- When the communication method of the twist-pair-cable transmitter is set to long reach, it will connect with long-reach communication method when [DIGITAL LINK MODE] is set to [AUTO]. To connect with the optional DIGITAL LINK Switcher (Model No.: ET-YFB200G) with the long-reach communication method, set [DIGITAL LINK MODE] to [LONG REACH].
- It will not connect correctly if the twist-pair-cable transmitter is not supporting the long-reach communication method even if [DIGITAL LINK MODE] is set to [LONG REACH].
[DIGITAL LINK SETUP]
Set the communication method of DIGITAL LINK or Ethernet.
When the projector is connected directly via Ethernet
1) Press ▲▼ to select [DIGITAL LINK SETUP].
2) Press the button.
- The [DIGITAL LINK SETUP] screen is displayed.
3) Press ▲▼ to select [DUPLEX(ETHERNET)].
4) Press ◀▶ to switch the communication method.
- The items will switch each time you press the button.
| [AUTONEGOTIATION] | Sets the communication method automatically. |
| [100BaseTX-Full] | Full-duplex communication method is set. |
| [100BaseTX-Half] | Half-duplex communication method is set. |
5) Press ▲▼ to select [STORE].
6) Press the button.
7) When the confirmation screen is displayed, press ◀▶ to select [OK], and press the button.
Note
- The projector does not support 10BaseT Full/Half.
When the projector is connected to a twisted-pair-cable transmitter
1) Press ▲▼ to select [DIGITAL LINK SETUP].
2) Press the button.
- The [DIGITAL LINK SETUP] screen is displayed.
3) Press ▲▼ to select [DUPLEX(DIGITAL LINK)].
4) Press ◀▶ to switch the communication method.
- The items will switch each time you press the button.
| [100BaseTX-Full] Full-duplex communication method is set. |
| [100BaseTX-Half] Half-duplex communication method is set. |
| [AUTONEGOTIATION] Sets the communication method automatically. |
5) Press ▲▼ to select [STORE].
6) Press the button.
7) When the confirmation screen is displayed, press ◀▶ to select [OK], and press the button.
[DIGITAL LINK STATUS]
Display the DIGITAL LINK connection environment.
1) Press ▲▼ to select [DIGITAL LINK STATUS].
2) Press the button.
- The [DIGITAL LINK STATUS] screen is displayed.
| [LINK STATUS] Either [NO LINK], [DIGITAL LINK], [LONG REACH], or [ETHERNET] is displayed. |
| [HDCP STATUS] Either [NO SIGNAL], [OFF], or [ON] is displayed. |
| [SIGNAL QUALITY] | [SIGNAL QUALITY] is a numerical value of the amount of error, and the display color changes to green, yellow, or red depending on that value.Check the signal quality level while receiving a signal from the twisted-pair-cable transmitter.[MAX]/[MIN]: Maximum/minimum value of the amount of error•Green (-12 dB or lower) → Normal signal quality level•Yellow (-11 to -8 dB) → Warning level where there is the possibility of noise introduced on the screen•Red (-7 dB or higher) → Abnormal level where synchronization may be interrupted, or a signal may not be received |
[NETWORK SETUP]
Perform the initial setting of the network before using the network function.
1) Press ▲▼ to select [NETWORK SETUP].
2) Press the button.
- The [NETWORK SETUP] screen is displayed.
3) Press ▲▼ to select an item, and change the settings according to the operation instructions of the menu.
| [PROJECTOR NAME] | Allows to change the projector name. Enter the host name if it is required in such a case when you use a DHCP server. |
| [DHCP] | [ON] | If a DHCP server exists in the network where the projector is to be connected, obtains the IP address automatically. |
| [OFF] | If a DHCP server does not exist in the network where the projector is to be connected, set [IP ADDRESS], [SUBNET MASK], and [DEFAULT GATEWAY]. |
| [IP ADDRESS] Enter the IP address when you do not use a DHCP server. |
| [SUBNET MASK] Enter the subnet mask when you do not use a DHCP server. |
| [DEFAULT GATEWAY] Enter the default gateway address when you do not use a DHCP server. |
| [STORE] Save the current network settings. |
4) Press ▲▼ to select [STORE], and press the button.
5) When the confirmation screen is displayed, press ◀▶ to select [OK], and press the button.
Note
- When using a DHCP server, confirm that the DHCP server is running.
- Consult your network administrator regarding the IP address, subnet mask, and default gateway.
- When [Art-Net SETUP] is set to [ON(2.X.X.X)] or [ON(10.X.X.X)], [NETWORK SETUP] cannot be selected.
[NETWORK CONTROL]
Set up the control method of the network.
1) Press ▲▼ to select [NETWORK CONTROL].
2) Press the button.
•The [NETWORK CONTROL] screen is displayed.
3) Press ▲▼ to select an item, and press ◀▶ to change the setting.
| [WEB CONTROL] Set to | [ON] to control with the web browser. |
| [PJLink CONTROL] Set to | [ON] to control with the PJLink protocol. |
| [COMMAND CONTROL] | Set to [ON] to control with the/terminal control command format (⇨ page 183). Refer to “Control commands via LAN” (⇨ page 177). |
| [COMMAND PORT] Set the | port number used for command control. |
| [Crestron Connected(TM)] Set to [ON] to control with Crestron Connected TM of Crestron Electronics, Inc. |
| [AMX D.D.] | Set to [ON] to control with the controller of AMX Corporation.Setting this function to [ON] enables detection through “AMX Device Discovery”. For details, refer to the website of AMX Corporation.URL http://www.amx.com/ |
| [EXTRON XTP] | Set to [ON] when connecting the “XTP transmitter” of Extron Electronics to theterminal.The [EXTRON XTP] setting must be set to [OFF] when connecting the optional DIGITAL LINK output supported device (Model No.: ET-YFB100G, ET-YFB200G).For details of the “XTP transmitter”, refer to the website of Extron Electronics.URL http://www.extron.com/ |
| [STORE] Save the current network control settings. |
4) Press ▲▼ to select [STORE], and press the button.
5) When the confirmation screen is displayed, press ◀▶ to select [OK], and press the button.
[NETWORK STATUS]
Display the status of the projector network.
1) Press ▲▼ to select [NETWORK STATUS].
2) Press the button.
- The [NETWORK STATUS] screen is displayed.
| [DHCP] | Displays the status of use of the DHCP server. |
| [IP ADDRESS] Displays | the [IP ADDRESS]. |
| [SUBNET MASK] Displays | the [SUBNET MASK]. |
| [DEFAULT GATEWAY] | Displays the [DEFAULT GATEWAY]. |
| [DNS1] | Displays the address of the primary DNS server. |
| [DNS2] Displays the | address of the secondary DNS server. |
| [MAC ADDRESS] Displays the [MAC ADDRESS]. |
When the optional DIGITAL LINK output supported device (Model No.: ET-YFB100G, ET-YFB200G) is connected to the terminal, the main menu of DIGITAL LINK output supported device is displayed. Refer to the Operating Instructions of the DIGITAL LINK output supported device for details.
Note
- When [EXTRON XTP] is set to [ON], [DIGITAL LINK MENU] cannot be selected.
- The operation guidance for the "RETURN" button is displayed on the menu screen of the Digital Interface Box and DIGITAL LINK Switcher. The projector does not have the "RETURN" button, but same operation is available with the button.
[Art-Net SETUP]
Make settings to use the Art-Net function. For the channel definitions used for controlling the projector with the Art-Net function, refer to “Using Art-Net function” ( page 175).
1) Press ▲▼ to select [Art-Net SETUP].
2) Press ◀▶ to select an item.
- The items will switch each time you press the button.
| [OFF] Disables the | Art-Net function. |
| [ON(2.X.X.X)] Enables | the Art-Net function and sets the IP address to 2.X.X.X. |
| [ON(10.X.X.X)] Enables | the Art-Net function and sets the IP address to 10.X.X.X. |
| [ON(MANUAL)] Enables | the Art-Net function and uses the IP address set in [NETWORK SETUP]. |
- When other than [OFF] is selected, proceed to Step 3).
3) Press the button.
•The [Art-Net SETUP] screen is displayed.
4) Press ▲▼ to select [CHANNEL SETUP].
5) Press ◀▶ to switch the item.
| [DEFAULT] Uses the channel assignment with the standard setting for the projector. |
| [USER] Uses to change the channel assignment. |
| [DZ870/DZ21K] | Uses the channel assignment with DZ870 series and DZ21K series compatible.DZ870 series: DZ870 series, DW830 series, DX100 seriesDZ21K series: DZ21K series, DS20K series, DW17K series, DZ16K series |
- When [DEFAULT] or [DZ870/DZ21K] is selected, pressing the button displays the function assigned to the channel.
- When [DEFAULT] or [DZ870/DZ21K] is selected, proceed to Step 9).
6) Press the button.
- The [CHANNEL SETUP] screen is displayed.
7) Press ▲▼ to select the channel to set, and press ◀▶ to switch the item.
| [LIGHT OUTPUT] Adjusts | the amount of light. |
| [INPUT SELECT] | Switches the input. |
| [LENS POSITION] | Moves the lens position. |
| [LENS H SHIFT] | Adjusts the lens shift in the horizontal direction. |
| [LENS V SHIFT] | Adjusts the lens shift in the vertical direction. |
| [LENS FOCUS] Adjusts the focus. |
| [LENS ZOOM] | Adjusts the zoom. |
| [POWER] | Controls the power status. |
| [SHUTTER] | Controls the shutter. |
| [GEOMETRY] | Performs geometric adjustment. |
| [CUSTOM MASKING] ^1 | Performs geometric adjustment using the computer.To use PC-1, PC-2, and PC-3, the optional Upgrade Kit (Model No.: ET-UK20) is required. |
| [FREEZE] Freezes the projected image. |
| [COLOR] Adjusts the color saturation. |
| [TINT] Adjusts the tint. |
| [RASTER PATTERN] Displays the raster pattern. |
| [ENABLE / DISABLE] Enables/disables the control of the projector with the Art-Net function. |
| [NONE] No definition | |
*1 Only for PT-DZ780
- The settings can be made by pressing ▲▼ to select the channel to set and pressing the button to display the item list, and pressing ▲▼ to select an item, and then pressing the button.
- Same item cannot be set for multiple channels, except for [NONE].
8) Press the button.
- The [Art-Net SETUP] screen is displayed.
9) Press ▲▼ to select an item, and press ◀▶ to switch the settings.
| [NET] Enter [NET] to be used when the projector processes Art-Net. |
| [SUB NET] Enter [SUB NET] to be used when the projector processes Art-Net. |
| [UNIVERSE] Enter [UNIVERSE] to be used when the projector processes Art-Net. |
| [START ADDRESS] Enter [START ADDRESS] to be used when the projector processes Art-Net. |
10) Press ▲▼ to select [STORE], and press the button.
11) When the confirmation screen is displayed, press ◀▶ to select [OK], and press the button.
Note
- If [ON(2.X.X.X)] or [ON(10.X.X.X)] is selected, IP address is calculated and set automatically.
Network connection
The projector has a network function, and the following operations are available from the computer using the web control.
- Setting and adjustment of the projector
- Display of the projector status
- Sending E-mail messages when there is a problem with the projector
The projector supports “Crestron Connected™”, and the following application software of Crestron Electronics, Inc. can be used.
- RoomView Express
•Fusion RV
•RoomView Server Edition
Attention
- When a LAN cable is directly connected to the projector, the network connection must be made indoors.
Note
- "Crestron Connected™" is a system of Crestron Electronics, Inc. that collectively manages and controls devices on multiple systems connected to the network using a computer.
- For details of "Crestron Connected™", refer to the website of Crestron Electronics, Inc. (English only)
URL http://www.crestron.com
To download "RoomView Express", go to the following website of Crestron Electronics, Inc. (English only)
URL http://www.crestron.com/getroomview
- A LAN cable is required to use the network function.
■Example of a normal network connection

flowchart
graph TD
A["Computer"] -->|LAN cable (straight)| B["Hub"]
B -->|LAN cable (straight)| C["Projector"]
- A web browser is required to use network function. Confirm that the web browser can be used beforehand.
Compatible browser: Internet Explorer 8.0/9.0/10.0/11.0 (Windows OS), Safari 6.0/7.0/8.0 (Mac OS)
- Communication with an E-mail server is required to use the E-mail function. Confirm that the E-mail can be used beforehand.
- Use a LAN cable that is compatible with category 5 or higher.
- Use a LAN cable of 100 m (328'1") or shorter.
Connecting to a twisted-pair-cable transmitter
The projector has a function that can receive Ethernet signals from a twisted-pair-cable transmitter together with video and audio signals via a LAN cable. Connect a LAN cable to the terminal of the projector. (▶ pages 20, 27)
■Example of network connections via a twisted-pair-cable transmitter

flowchart
graph TD
A["Computer"] -->|LAN cable (straight)| B["Hub"]
B -->|LAN cable (straight) | C["Projector"]
C -->|LAN cable (straight) | D["Hub"]
D -->|LAN cable (straight) | E["Projector"]
E -->|Twisted-pair-cable transmitter| F["Hub"]
- For the LAN cable between the twisted-pair-cable transmitter and the projector, use a cable that meets the following criteria:
-Compatible with CAT5e or higher
-Shielded type (including connectors)
-Straight-through
-Single wire
- The maximum transmission distance between the twisted-pair-cable transmitter and the projector is 100 m (328'1"). It is possible to transmit up to 150 m (492'2") if the twisted-pair-cable transmitter supports the long-reach communication method. If this distance is exceeded, image may be disrupted or a malfunction may occur in LAN communication.
- When laying cables between the twisted-pair-cable transmitter and the projector, check that cable characteristics are compatible with CAT5e or higher using tools such as a cable tester or cable analyzer.
When a relay connector is used, include it in the measurement.
- Do not use a hub between the twisted-pair-cable transmitter and the projector.
- Do not pull cables forcefully. In addition, do not bend or fold cables unnecessarily.
- To reduce the effects of noise as much as possible, stretch out the cables between the twisted-pair-cable transmitter and the projector without any loops.
- Lay the cables between a twisted-pair-cable transmitter and the projector away from other cables, particularly power cables.
- When laying multiple cables, run them side by side along the shortest distance possible without bundling them together.
- After laying the cables, confirm that the value of [SIGNAL QUALITY] in the [NETWORK] menu → [DIGITAL LINK STATUS] is displayed in green to indicate normal quality. (→ page 139)
- For twisted-pair-cable transmitters of other manufacturers of which the operation has been verified with the projector, refer to the Panasonic website (http://panasonic.net/avc/projector/). Note that the verification for devices of other manufacturers has been made for the items set by Panasonic Corporation, and not all the operations have been verified. For operation or performance problems caused by the devices of other manufacturers, contact the respective manufacturers.
Accessing from the web browser
1) Start up the web browser on the computer.
2) Enter the IP address set on the projector into the URL entry field of the web browser.
3) Enter the user name and the password.
- The factory default setting of the user name is user1 (user rights)/admin1 (administrator rights) and the password is panasonic (lower case).

4) Click OK.
•The [Projector status] page is displayed.

Note
- If you use a web browser to control the projector, set [WEB CONTROL] to [ON] in [NETWORK CONTROL] (→ page 140).
- Do not perform setting or control simultaneously by starting up multiple web browsers. Do not set or control the projector from multiple computers.
- Change the password first. (→ page 157)
- The administrator rights allow use of all functions. The user rights allow use of [Projector status] (→ page 146), confirmation of the error information page (→ page 147), [Network status] (→ page 148), [Basic control] (→ page 150), and [Change password] (→ page 157) only.
- Access will be locked for few minutes when an incorrect password is entered three times consecutively.
- Some items on the projector setting page use the Javascript function of the web browser. The projector may not be able to be controlled properly if this function is disabled on the browser settings.
- If the screen for the web control is not displayed, consult your network administrator.
- While updating the screen for the web control, the screen may appear white for a moment, but it is not a malfunction.
Descriptions of items

1 Page tab
Switches pages by clicking this item.
2 [Status]
The status of the projector is displayed by clicking this item.
3 [Projector control]
The [Projector control] page is displayed by clicking this item.
4 [Detailed set up]
The [Detailed set up] page is displayed by clicking this item.
5 [Change password]
The [Change password] page is displayed by clicking this item.
6 [Crestron Connected(TM)]
The operation page of Crestron Connected ^™ is displayed by clicking this item.
[Projector status] page
Click [Status] → [Projector status].
Display the status of the projector for the following items.

1 [PROJECTOR TYPE]
Displays the type of the projector.
2 [MAIN VERSION]
Displays the firmware version of the projector.
3 [POWER]
Displays the status of the power.
4 [SHUTTER]
Displays the status of shutter function (ON: enabled (closed), OFF: disabled (open)).
5 [LAMP SELECT]
Displays the setting status of [LAMP SELECT] (→ page 112).
6 [SERIAL NUMBER]
Displays the serial number of the projector.
7 [REMOTE2 STATUS]
Displays the control status of the terminal.
8 [OSD]
Displays the status of the on-screen display.
9 [LAMP POWER]
Displays the setting status of [LAMP POWER] (→ page 113).
10 [INPUT]
Displays the status of the selected input.
11 [INTAKE AIR TEMPERATURE]
Displays the status of the intake air temperature of the projector.
12 [OPTICS MODULE TEMPERATURE]
Displays the status of the internal temperature of the projector.
13 [EXHAUST AIR TEMPERATURE]
Displays the status of the exhaust air temperature of the projector.
14 [LAMP1], [LAMP2], [RUNTIME]
Displays the lighting status and runtime of the lamp.
15 [SELF TEST]
Displays the self-test information.
16 [PROJECTOR RUNTIME]
Displays the runtime of the projector.
Error information page
When [Error (Detail)] or [Warning (Detail)] is displayed in the self-test display of the [Projector status] screen, click it to display the error/warning details.
- The projector may go into the standby status to protect the projector depending on the contents of the error.


1
1 Self-test result display
Displays the item check results.
[OK]:
Indicates that operation is normal.
[FAILED]:
Indicates that there is a problem.
[WARNING]:
Indicates that there is a warning.
■[FAILED] items
| Item Description | |
| [MAIN CPU BUS] There is a problem with the micro | computer circuitry. Consult your dealer. |
| [FAN] There is a problem with the fan or the fan drive | circuit. Consult your dealer. |
| [INTAKE AIR TEMPERATURE] | The intake air temperature is high. The projector may be used in an environment where the temperature is high, such as near a heating appliance. |
| [OPTICS MODULE TEMPERATURE] | The temperature around the optics module inside the projector is high. The projector may be used in an environment where the temperature is high, such as near a heating appliance. |
| [EXHAUST AIR TEMPERATURE] The exhaust air temperature is high. The air exhaust port may be blocked. |
| [LAMP1 REMAIN TIME] The runtime of the lamp has exceeded the specified time, and it is time to replace the lamp. |
| [LAMP2 REMAIN TIME] | |
| [LAMP1 STATUS] | The lamp has failed to turn on. Wait a while until the luminous lamp cools off, and then turn on the power. |
| [LAMP2 STATUS] |
| [APERTURE(CONTRAST-SHUTTER)] | There is a problem with the contrast shutter circuitry. Consult your dealer. |
| [SHUTTER(MUTE-SHUTTER)] There is a problem with the shutter circuitry. Consult your dealer. |
| [INTAKE AIR TEMP.SENSOR] | There is a problem with the sensor used to detect intake air temperature. Consult your dealer. |
| [OPTICS MODULE TEMP.SENSOR] | There is a problem with the sensor used to detect temperature inside the projector. Consult your dealer. |
| [EXHAUST AIR TEMP.SENSOR] | There is a problem with the sensor used to detect exhaust air temperature. Consult your dealer. |
| [COLOR WHEEL] | There is a problem with the color wheel or the color wheel drive circuit. Consult your dealer. |
| [LENS MOUNTER] | There is a problem in the lens mounter. Consult your dealer. |
| [COVER OPEN] | Installation of the lamp unit cover is incomplete. Check the installation of the lamp unit cover. ( page 167) |
| [BRIGHTNESS SENSOR] | There is a problem with the brightness sensor. If problems persist even after switching on the power, consult your dealer. |
■[WARNING] items
| Item Description | |
| [AC POWER] | AC input voltage is weak. Use electric wiring that can sufficiently withstand the power consumption of the projector. |
| [LOW-TEMPERATURE] | The temperature around the optics module inside the projector is low. Projection cannot be started until the optics module becomes warm. |
| [HORIZONTAL TILT] The projector is used tilted at an angle that exceeds 15° from the horizontal plane. |
| [LIGHT OUTPUT LIMIT] | The projector may be used in an environment where the temperature is high. The light output is reduced by approx. 20 % to protect the projector. |
| [INTAKE AIR TEMPERATURE] | The intake air temperature is high. The projector may be used in an environment where the temperature is high, such as near a heating appliance. |
| [OPTICS MODULE TEMPERATURE] | The temperature around the optics module inside the projector is high. The projector may be used in an environment where the temperature is high, such as near a heating appliance. |
| [EXHAUST AIR TEMPERATURE] The exhaust air temperature is high. The air exhaust port may be blocked. |
| [LAMP1 REMAIN TIME] The runtime of the lamp has exceeded the specified time, and it is time to replace the lamp. |
| [LAMP2 REMAIN TIME] | |
| [BATTERY] Battery replacement is required. Consult your dealer. |
| [AIR FILTER CASE] The air filter case is not attached. Check the attachment of the air filter unit.(⇨ page 165) |
| [AIR FILTER] There is too much dust accumulated in the air filter. Turn theswitch(⇨ page 61), and clean the air filter. (⇨ page 165) |
[Network status] page
Click [Status] → [Network status].
The current network setting status is displayed.

[Access error log] page
Click [Status] → [Access error log].
The error log on the web server is displayed such as access to the pages that do not exist or access with unauthorized user names or passwords.
![Projector Control Window Project status Network status Access miss log Mail miss log Web server error log [Box Box 10.15(01138.2014) (error) (client: 106.046.08-198)] Connection: I and out reading Status Projector control Installed out up Change password Creation processed (TM) Parameters](/content/2026/05/913482/images/8e59b36e765139aad033f65c34bbd7b4afd4306bc5cb19d2d7a3ebcc4675651c.jpg)
[Mail error log] page
Click [Status] → [Mail error log].
Display E-mail error information if periodic E-mail sending has failed.

Note
- [Access error log] and [Mail error log] display the recent few thousand accesses/requests. All information may not be displayed when many accesses/requests are made at one time.
- When [Access error log] and [Mail error log] exceed certain amount, information is erased from the oldest.
- Check [Access error log] and [Mail error log] periodically.
[Basic control] page
Click [Projector control] → [Basic control].

1 [POWER]
Turns on/off the power.
2 [SHUTTER]
Switches whether to use the shutter function (enabled (shutter: closed)/disabled (shutter: open)).
3 [OSD]
Switches on (display)/off (hide) the on-screen display function.
4 [SYSTEM]
Switches the system method.
5 On-screen display of the projector
Displays the same items as shown on the on-screen display of the projector. You can check or change the settings of the menus. It is displayed even if the on-screen display function is set to off (hide).
6 [INPUT SELECT]
Switches the input signal.
(SDI input is supported only for PT-DZ780.)
[Detail control] page
Click [Projector control] → [Detail control].

1 Control of the projector
The projector is controlled by clicking the buttons in the same way as the buttons on the remote control. After control, the on-screen display of the projector at the right of the control page is updated.
2 [SUB MEMORY]
Switches the sub memory.
3 [SYSTEM DAYLIGHT VIEW]
Switches to system daylight view settings.
4 [FREEZE]
Freezes the image temporarily.
5 [P IN P]
Switches the P IN P setting.
6 [WAVEFORM MONITOR]
Displays the waveform of the input signal.
7 [LENS]
Adjusts the projection lens.
8 [TEST PATTERN]
Displays the test pattern.
9 [GET OSD]
Updates the on-screen display of the projector at the right of the control page.
[Network config] page
Click [Detailed set up] → [Network config].
- Click [Network config] to display the [CAUTION!] screen.
- The current settings are displayed by pressing the [Next] button.
- Click [Change] to display the setting change screen.
![Projector Control Window Projector control window Email set up Authentication set up Network config Adjust key Program Projector NAME NAME:1234 IP SNCP ON C:\NCP OFF IP ADDRESS : 102.168.4.0 [Example: 192.168.0.100] SUBNET MASK : 245.264.266.0 [Example: 255.265.261.0] DP ALAT : 192.168.4.0 [Example: 192.168.0.234] GATTWAY DNS1 : [Example: 192.168.0.100] DNS2 : [Example: 192.168.0.100] Back Next 1 2 3 4 5 6 7 8](/content/2026/05/913482/images/fa344e7b4678c5904ed174f485aec0ac874bf047d4a9aae9597086a4fb05b002.jpg)
1 [PROJECTOR NAME]
Enter the name of the projector. Enter the host name if it is required when using a DHCP server etc.
2 [DHCP ON], [DHCP OFF]
To enable the DHCP client function, set to [DHCP ON].
3 [IP ADDRESS]
Enter the IP address when not using a DHCP server.
4 [SUBNET MASK]
Enter the subnet mask when not using a DHCP server.
5 [DEFAULT GATEWAY]
Enter the default gateway address when not using a DHCP server.
Note
6 [DNS1]
Enter the DNS1 server address.
Permissible characters for the entry of DNS1 server address (primary):
Numbers (0 - 9), period (.)
(Example: 192.168.0.253)
7 [DNS2]
Enter the DNS2 server address.
Available characters for the entry of DNS2 server address
(secondary):
Numbers (0 - 9), period (.)
(Example: 192.168.0.254)
8 [Back], [Next]
Click the [Back] button to return to the original screen. The current settings are displayed by pressing the [Next] button. Click the [Submit] button to update the settings.
- When you use the "Forward" and "Back" functions of your browser, a warning message "Page has Expired" may appear. In that case, click [Network config] again since the following operation will not be guaranteed.
- Changing LAN settings while connected to the LAN may cause the connection to cut out.
[Adjust clock] page
Click [Detailed set up] → [Adjust clock].

1 [Time Zone]
Select the time zone.
2 [Set time zone]
Updates the time zone setting.
3 [NTP SYNCHRONIZATION]
Set to [ON] to adjust the date and time automatically.
4 [NTP SERVER NAME]
Enter the IP address or server name of the NTP server when you set to adjust the date and time manually.
(To enter the server name, the DNS server needs to be configured.)
5 [Date]
Enter the date to be changed.
6 [Time]
Enter the time to be changed.
7 [Submit]
Updates the date and time settings.
Note
- The replacement of the battery inside the projector is required when the time goes out of alignment right after correcting the time. Consult your dealer.
[Ping test] page
Check whether the network is connected to the E-mail server, POP server, DNS server, etc.
Click [Detailed set up] → [Ping test].

1 [Input IP address]
Enter the IP address of the server to be tested.
2 [Submit]
Executes the connection test.

3 Example of display when the connection has succeeded
4 Example of display when the connection has failed
[E-mail set up] page
When there is a problem or the runtime of the lamp reaches a set value, an E-mail can be sent to preset E-mail addresses (up to two addresses).
Click [Detailed set up] → [E-mail set up].

1 [ENABLE]
Select [Enable] to use the E-mail function.
2 [SMTP SERVER NAME]
Enter the IP address or the server name of the E-mail server (SMTP). To enter the server name, the DNS server needs to be set up.
3 [MAIL FROM]
Enter the E-mail address of the projector. (Up to 63 characters in single byte)
4 [MEMO]
Enter information such as the location of the projector that notifies the sender of the E-mail. (Up to 63 characters in single byte)
5 [MINIMUM TIME]
Change the minimum interval for the temperature warning E-mail. The default value is 60 minutes. In this case, another E-mail will not be sent for 60 minutes after sending the temperature warning E-mail even if it reaches the warning temperature.
6 [INTAKE AIR TEMPERATURE]
Change the temperature setting for the temperature warning mail. A temperature warning E-mail is sent when the temperature exceeds this value.

7 [E-MAIL ADDRESS 1], [E-MAIL ADDRESS 2]
Enter the E-mail address to be sent. Leave [E-MAIL ADDRESS 2] blank when two E-mail addresses are not to be used.

8 Settings of the conditions to send E-mail
Select the conditions to send E-mail.
Select either [NORMAL] or [SIMPLE].
Send an E-mail when an error occurred in the self-test.
Send an E-mail when the remaining lamp runtime for the lamp 1 has reached the value set at the right field.
Send an E-mail when the remaining lamp runtime for the lamp 2 has reached the value set at the right field.
Send an E-mail when the intake air temperature has reached the value set at the above field.
Place a check mark on this to send an E-mail periodically.
It will be sent on the days and time with the check mark.
Update the settings.
[MAIL CONTENTS]:
[ERROR]:
[LAMP1 RUNTIME]:
[LAMP2 RUNTIME]:
[INTAKE AIR TEMPERATURE]:
[PERIODIC REPORT]:
9 [Submit]
[Authentication set up] page
Set the authentication items when POP authentication or SMTP authentication is necessary to send an E-mail. Click [Detailed set up] → [Authentication set up].

1 [Auth]
Select the authentication method specified by your Internet service provider.
Set when the SMTP authentication is selected.
Enter the POP server name.
Allowed characters:
Alphanumerics (A - Z, a - z, 0 - 9)
Minus sign (-) and period (.)
Enter the user name for the POP server or the SMTP server.
Enter the password for the POP server or the SMTP server.
Enter the port number of the SMTP server.
(Normally 25)
Enter the port number of the POP server.
(Normally 110)
Update the settings.
2 [SMTP Auth]
3 [POP server name]
4 [User name]
5 [Password]
6 [SMTP server port]
7 [POP server port]
8 [Submit]
Contents of E-mail sent
Example of the E-mail sent when E-mail is set
The following E-mail is sent when the E-mail settings have been established.
=== Panasonic projector report (CO NFI G URE) ===
Project or Type : DZ 780
Serial No : 123456789012
---- E-mail setup data ----
TEMPERATURE WARNING SETUP
MI NIMUM TIME at [60] minutes int erval
INT AKE AIR TEMPERATURE Over [46 degC / 114 degF]
ERROR [ON]
LAMP1 RUNTIME [ON] at REMAIN [400] H
LAMP1 RUNTIME [ON] at REMAIN [200] H
LAMP2 RUNTIME [ON] at REMAIN [400] H
LAMP2 RUNTIME [ON] at REMAIN [200] H
INTAKE AIR TEMPERATURE [OFF]
PERIO DIC REPO RT
Sunday [OFF] Monday [OFF] Tuesday [OFF] Wednesday [OFF]
Thursday [OFF] Friday [OFF] Saturday [OFF]
00:00 [OFF] 01:00 [OFF] 02:00 [OFF] 03:00 [OFF]
04:00 [OFF] 05:00 [OFF] 06:00 [OFF] 07:00 [OFF]
08:00 [OFF] 09:00 [OFF] 10:00 [OFF] 11:00 [OFF]
12:00 [OFF] 13:00 [OFF] 14:00 [OFF] 15:00 [OFF]
16:00 [OFF] 17:00 [OFF] 18:00 [OFF] 19:00 [OFF]
20:00 [OFF] 21:00 [OFF] 22:00 [OFF] 23:00 [OFF]
---- check system ----
MAI N CPU BUS [OK]
FAN [OK]
INTAKE AIR TEMPERATURE [OK]
OPTICS MODULE TEMPERATURE [OK]
EXHAUST AIR TEMPERATURE [OK]
LAMP1 REMAIN TIME [OK]
LAMP2 REMAIN TIME [OK]
LAMP1 STATUS [FAILED]
LAMP2 STATUS [FAILED]
APERT URE(CO NT RAST -SHUTT ER) [OK]
SHUTT ER(MUT E-SHUT T ER) [OK]
INTAKE AIR TEMP.SENSOR [OK]
OPTICS MODULE TEMP.SENSOR [OK]
EXHAUST AIR TEMP.SENSOR [OK]
BATTERY [OK]
COLO R WHEEL [OK]
LENS MO UNTER [OK]
COVER OPEN [OK]
BRIGHTNESS SENSOR [OK]
AIR FILTER CASE [OK]
AIR FILTER [OK]
AC POWER [OK]
(Error code 00 00 00 60 00 00 00 00 00 00 00 03 00 00 00)
Intake air temperature : — degC / — degF
Optics module temperature : — degC / — degF
Exhaust air temperature : — degC / — degF
PRO JECTO R RUNTIME 21 H
PO WER ON 34 times
LAMP1 ON 0 times
LAMP1 ECO 0 H
LAMP1 NO RMAL 0 H
LAMP1 REMAIN N 4000 H
LAMP2 ON 0 times
LAMP2 ECO 0 H
LAMP2 NO RMAL 0 H
LAMP2 REMAIN N 4000 H
---- Current status ----
MAIN VERSION 0.16
SUB VERSION 0.01.01
LAMP STATUS LAMP1=OF F LAMP2=OF F
INPUT RGB2
REMOTE2 STATUS DISABLE
---- Wired Network configuration ----
DHCP Client OF F
IP address 192.168.0.8
MAC address 10:20:30:40:50:60
Mon Jan 01 12:34:56 20XX
---- Memo ----
Example of the E-mail sent for an error
The following E-mail is sent when an error has occurred.
=== Panasonic projector report (ERRO R) ===
Project or Type : DZ 780
Serial No : 123456789012
---- check system ----
MAI N CPU BUS [ OK ]
FAN [ OK ]
INTAKE AIR TEMPERATURE [ OK ]
OPTICS MODULE TEMPERATURE [ OK ]
EXHAUST AIR TEMPERATURE [ OK ]
LAMP1 REMAIN TIME [ OK ]
LAMP2 REMAIN TIME [ OK ]
LAMP1 STATUS [ FAILED ]
LAMP2 STATUS [ FAILED ]
APERT URE(CONT RAST -SHUTT ER) [ OK ]
SHUTT ER(MUT E-SHUT T ER) [ OK ]
INTAKE AIR TEMP.SENSOR [ OK ]
OPTICS MODULE TEMP.SENSOR [ OK ]
EXHAUST AIR TEMP.SENSOR [ OK ]
BATTERY [ OK ]
COLO R WHEEL [ OK ]
LENS MO UNTER [ OK ]
COVER OPEN [ OK ]
BRIGHTNESS SENSOR [ OK ]
AIR FILTER CASE [ OK ]
AIR FILTER [ OK ]
AC POWER [ OK ]
(Error code 00 00 00 60 00 00 00 00 00 00 00 03 00 00 00)
Intake air t emperat ure : — degC / — degF
Optics module temperature : — degC / — degF
Exhaust air t emperat ure : — degC / — degF
PRO JECTO R RUNTIME 21 H
PO WER O N 34 times
LAMP1 O N 0 times
LAMP1 ECO 0 H
LAMP1 NO RMAL 0 H
LAMP1 REMAI N 4000 H
LAMP2 O N 0 times
LAMP2 ECO 0 H
LAMP2 NO RMAL 0 H
LAMP2 REMAI N 4000 H
---- Current status ----
MAIN VERSION 0.16
SUB VERSION 0.01.01
LAMP STATUS LAMP1=OF F LAMP2=OF F
INPUT RGB2
REMOTE2 STATUS DISABLE
---- Wired Network configuration ----
DHCP Client OF F
IP address 192.168.0.8
MAC address 10: 20: 30:40:50: 60
Mon Jan 01 12: 34:56 20XX
---- Memo ----
[Change password] page
Click [Change password].

1 [Administrator]
Used to change the setting of the [Administrator].
3 [Next]
Used to change the setting of the password.
2 [User]
Used to change the setting of the [User].
[Administrator] account

1 [Account]
Displays the account to change.
2 [Current]
[User name]:
Enter the user name before the change.
[Password]:
Enter the current password.
3 [New]
[User name]:
Enter the desired new user name. (Up to 16 characters in single byte)
[Password]:
Enter the desired new password. (Up to 16 characters in single byte)
[Password(Retype)]:
Enter the desired new password again.
4 [OK]
Determines the change of password.
[User] account

1 [Account]
Displays the account to change.
3 [OK]
Determines the change of password.
2 [New]
[User name]:
Enter the desired new user name. (Up to 16 characters in single byte)
[Password]:
Enter the desired new password. (Up to 16 characters in single byte)
[Password(Retype)]:
Enter the desired new password again.
[Change password] (For user rights)
Only the change of password is enabled under the user rights.

1 [Old Password]
Enter the current password.
3 [Retype]
Enter the desired new password again.
2 [New Password]
Enter the desired new password. (Up to 16 characters in single byte)
4 [OK]
Determines the change of password.
Note
- To change the account of the administrator, you must enter the [User name] and [Password] in [Current].
[Crestron Connected(TM)] page
The projector can be monitored/controlled with Crestron Connected™.
To start the operation page of Crestron Connected ^TM from the web control screen, you need to access with the administrator rights. (For user rights, the [Crestron Connected(TM)] button is not displayed on the web control screen.)
The operation page of Crestron ConnectedTM is displayed by clicking [Crestron Connected(TM)].
It is not displayed if Adobe Flash Player is not installed on your computer, or the browser you use does not support Flash. In that case, click [Back] on the operation page to go back to the previous page.
Operation page

1 [Tools], [Info], [Help]
Tabs for selecting the setting, information, or help page of the projector.
2 [POWER]
Turns on/off the power.
3 [SHUTTER]
Switches whether to use the shutter function (enabled (shutter: closed)/disabled (shutter: open)).
4 [Input Select]
Controls input selection.
Not available when the power of the projector is turned off.
5 Menu screen control buttons
Navigates the menu screen.
6 Freeze/image quality adjustment
Controls items related to freeze/image quality.
7 [Back]
Performs return to the previous page.
[Tools] page
Click [Tools] on the operation page.

1 [Control System]
Set the information required for communicating with the controller to be connected with the projector.
2 [User Password]
Set the user rights password for the operation page of Crestron ConnectedTM.
3 [Admin Password]
Set the administrator rights password for the operation page of Crestron Connected™.
4 Network status
Displays the settings of wired LAN.
[DHCP]
Displays the current setting.
[Ip Address]
Displays the current setting.
[Subnet Mask]
Displays the current setting.
[Default Gateway]
Displays the current setting.
[DNS Server]
Displays the current setting.
5 [Exit]
Returns to the operation page.
[Info] page
Click [Info] on the operation page.

1 [Projector Name]
Displays the projector name.
2 [Mac Address]
Displays the MAC address.
3 [Lamp1 Hours], [Lamp2 Hours]
Displays the runtime of the lamp 1 and the lamp 2.
4 [Power Status]
Displays the status of the power.
5 [Source]
Displays the selected input.
6 [Lamp Mode]
Displays the setting status of [LAMP POWER] (→ page 113).
7 [Error Status]
Displays the error status.
8 [Exit]
Returns to the operation page.
[Help] page
Click [Help] on the operation page.
The [Help Desk] window is displayed.

1 [Help Desk]
Send/receive messages to/from an administrator who uses
Crestron ConnectedTM.
Chapter 5 Maintenance
This chapter describes methods of inspection when there are problems, maintenance, and replacement of the components.
Lamp/temperature/filter indicators
When an indicator lights up
If a problem should occur inside the projector, the lamp indicators /, the temperature indicator , and the filter indicator will inform you by lighting or blinking. Check the status of the indicators and manage the indicated problems as follows.
Attention
- When switching off the projector to deal with problems, make sure to follow the procedure in "Switching off the projector" (→ page 61).

Lamp indicators /
| Indicator status | Lighting in red/lighting in orange*1 | Blinking in red (1 time) | Blinking in red (3 times) |
| Status | Time to replace the lamp unit. (→ page 166) | The lamp unit is not attached. | A problem is detected in the lamp or the power supply for the lamp. |
| Cause | ●Was [REPLACE LAMP] displayed when you turned on the power?●The indicator lights up when the runtime of the lamp unit reaches 3 800 hours (when [LAMP POWER] is set to [NORMAL]). | ●Is the lamp unit attached? | ●Have you turned on the power again immediately after turning it off? | ●Some error has occurred in the lamp circuit. Check for fluctuation (or drop) in the source voltage. |
| Solution ●Replace | the lamp unit. | ●Attach the lamp unit if it is not attached.●If the indicator is still blinking in red even when the lamp unit is attached, consult your dealer. | ●Wait a while until the luminous lamp cools off, and then turn on the power. | ●Turn theswitch to(→ page 61), and consult your dealer. |
*1 The indicator lights up in red while the lamp is turned off, and lights up in orange while the lamp is turned on.
Note
- If the lamp indicators / are still lit or blinking after taking the measures, ask your dealer for repair.
- The lamp indicator corresponding to the lamp being lit will light up in green if the projector is in projection mode and there is no indication of problem by lighting or blinking in red or orange.
Temperature indicator
| Indicator status Lighting in red | Blinking in red(2 times) | Blinking in red(3 times) |
| Status Warm-up status | | Internal temperature is high (warning). | Internal temperature is high (standby status). | The cooling fan has stopped. |
| Cause | Did you turn on the power when the temperature was low (around 0 °C (32 °F))? | Is the air intake/exhaust port blocked?Is the room temperature high?Is the filter indicatorlit? | — |
| Solution | Wait at least 10 minutes in the current status.Install the projector in a location with the operating environment temperature between 0 °C (32 °F) and 45 °C (113 °F)*1. | Remove any objects that are blocking the air intake/ exhaust port.Install the projector in a location with the operating environment temperature between 0 °C (32 °F) and 45 °C (113 °F)*1.Do not use the projector at high altitudes of 2 700 m (8 858') or higher above sea level.Clean or replace the air filter. (→ page 164) | Turn theswitch to(→ page 61), and consult your dealer. |
*1 When using the projector at high altitudes (between 1 400 m (4 593') and 2 700 m (8 858') above sea level), the operating environment temperature should be between 0 °C (32 °F) and 40 °C (104°F).
Note
- If the temperature indicator is still lit or blinking after taking the measures, ask your dealer for repair.
- If you use the projector with the following two settings, the light output may be reduced by approx. 20 % to protect the projector when the operating environment temperature becomes 40 °C (104 °F) or higher (35 °C (95 °F) or higher when used at high altitude).
-When [LAMP SELECT] is set to [DUAL] from the menu
-When [LAMP POWER] is set to [NORMAL] from the menu
Filter indicator
| Indicator status Lighting in red Blinking in red | |
| Status | The filter is clogged.The temperature inside or outside the projector is abnormally high. | The air filter case is not attached. |
| Cause •Is the air filter dirty? | •Is the air intake/exhaust port blocked? | •Is the air filter case attached? |
| Solution | •Clean or replace the air filter.(⇨ page 164) | •Remove any objects that are blocking the air intake/exhaust port. | •Attach the air filter case. |
Note
- If the filter indicator is still lit or blinking after taking the measures, ask your dealer for repair.
- If the air filter case is not attached when the projector is switched on, the filter indicator blinks in red.
Maintenance/replacement
Before performing maintenance/replacement
- Make sure to turn off the power before performing maintenance/replacement. (→ pages 55, 61)
- When switching off the projector, make sure to follow the procedures in "Switching off the projector" (→ page 61).
Maintenance
Outer case
Wipe off dirt and dust with a soft, dry cloth.
- If the dirt is persistent, soak the cloth with water and wring it thoroughly before wiping. Dry off the projector with a dry cloth.
- Do not use benzene, thinner, or rubbing alcohol, other solvents, or household cleaners. Doing so may deteriorate the outer case.
- When using chemically treated dust cloths, follow the instructions written on its packaging.
Lens front surface
Wipe off dirt and dust from the front surface of the lens with a soft clean cloth.
- Do not use a cloth that is fluffy, dusty, or soaked with oil/water.
- Since the lens is fragile, do not use excessive force when wiping the lens.
Attention
- The lens is made of glass. Impacts or excessive force when wiping may scratch its surface. Handle with care.
Air filter
Perform maintenance of the air filter in the following case.
- The air filter is clogged with dust, causing the filter replacement message to appear on the screen and the filter indicator to light in red.
Removing the air filter

Fig. 1

Fig. 2 Fig. 3
1) Remove the lamp unit cover. (Fig. 1)
- Use a Phillips screwdriver to turn the lamp unit cover fixing screw (x1) counterclockwise until it turns freely, and open the lamp unit cover slowly in the direction of the arrow.
- Opening the lamp unit cover quickly may damage the cover.
- If you loosen the lamp unit cover fixing screw with the projector installed upward in the vertical direction, the lamp unit cover may open on its weight and may be dropped off.
2) Pull out the air filter case. (Fig. 2)
- Pull out the air filter case from the projector.
3) Remove the air filter from the air filter case. (Fig. 3)
- Hold (a) of the air filter, pull up the air filter while pushing in the direction of the arrow.
Cleaning the air filter
Remove the air filter beforehand with the previously described procedure of "Removing the air filter".

natural_image
Line drawing of a hand using a tool to cut a rectangular component with a knife (no text or symbols)
1) Clean the air filter.
•Vacuum dust from the air filter with a vacuum cleaner.
Attaching the air filter

Fig. 1 Fig. 2
1) Attach the air filter.
i) Attach the air filter by aligning the marking (△) on (a) and (b) and inserting the tabs on the air filter to the air filter case. (Fig. 1)
ii) Push in the air filter in the direction of the arrow, and fit the tabs securely. (Fig. 2)
2) Attach the air filter case to the projector.
- Insert the air filter case all the way in.
3) Attach the lamp unit cover.
- Perform Step 1) in "Removing the air filter" in the reverse order to close the lamp unit cover.
- Attach the lamp unit cover so that the connector on the lamp unit cover is inserted to the fan power connector securely.
- Use a Phillips screwdriver to firmly tighten the lamp unit cover fixing screw (x1).
- Make sure to attach the lamp unit cover securely.
Note
- Make sure that the air filter case is properly attached before using the projector. If it is not attached, the projector will suck in dirt and dust causing a malfunction.
- If you use the projector without attaching the air filter case, the filter indicator blinks in red and the message appears on the projected image for approximately 30 seconds.
- Do not use water when washing the air filter. Washing with water may decrease the dust absorption capability.
- When the dust remains after cleaning, it is time to replace the air filter.
The air filter for the replacement (TMZX5229) is an optional accessory (service part). To purchase the product, consult your dealer. The optional Replacement lamp unit (Model No.: ET-LAD70 (1 pc), ET-LAD70W (2 pcs)) comes with one air filter.
Replacement
Lamp unit
The lamp unit is a consumable component. Refer to “When to replace the lamp unit” ( page 166) for details about the replacement cycle.
When purchasing the optional Replacement lamp unit (Model No.: ET-LAD70 (1 pc), ET-LAD70W (2 pcs)), consult your dealer.
It is recommended that you request a qualified technician to replace the lamp unit. Consult your dealer.
WARNING
Replace the lamp unit after the lamp has cooled (after waiting at least one hour). The high temperature inside the cover will cause burns.
Checking the lamp unit to be replaced
1) Check the status of the lamp indicators /.
- The lamp unit corresponding to the lamp indicator that is lit in red is required to be replaced.
Notes on the replacement of the lamp unit
- A Phillips screwdriver is necessary when replacing the lamp unit.
- Since the luminous lamp is made of glass, it may burst if dropped or hit with a hard object. Handle with care.
- Do not disassemble or modify the lamp unit.
- When replacing the lamp unit, be sure to hold it by the handle because its surface is pointed and its shape is protruded.
- The lamp may rapture. Replace the lamp unit carefully so that the glass fragments of the lamp do not scatter. While attaching the projector to the ceiling, do not work right under the lamp unit or do not conduct work while your face is near the lamp unit.
- The lamp contains mercury. When disposing of used lamp units, contact your local authorities or dealer for correct methods of disposal.
Attention
- Panasonic takes no responsibility for any damage or malfunction of the product resulting from use of lamp units which are not manufactured by Panasonic. Use only specified lamp units.
Note
- The model numbers of accessories and optional accessories are subject to change without prior notice.
When to replace the lamp unit
The lamp unit is a consumable component. Since its brightness gradually decreases over time, it is necessary to replace the lamp unit regularly. The estimated duration before replacement is 4 000 hours, but the lamp may go off before reaching to 4 000 hours, depending on the characteristics of the individual lamp, usage conditions, and the installation environment. It is recommended that the Replacement lamp unit be prepared earlier.
If you continue to use the lamp unit after 4 000 hours has elapsed, the lamp turns off automatically after approximately 10 minutes, as it may cause malfunction of the projector.
| On-screen displayREPLACE LAMP | Lamp indicator |
| Over 3 800 hours | The message is displayed for 30 seconds. Pressing any button on the control panel or remote control within 30 seconds will clear the message. | The indicator lights in red even during the standby mode. (Only the corresponding lamp lights on.) |
| Over 4 000 hours | The message remains displayed until you press any button. |
Note
- To predict when to replace the lamp, check the lamp runtime displayed on [LAMP1] and [LAMP2] in [STATUS] (→ page 122).
- 4 000 hours is a rough estimate for replacement, and not a guaranteed time.
How to replace the lamp unit
Attention
- When the projector is mounted on the ceiling, do not conduct work while your face is near the lamp unit.
- Make sure to attach the lamp unit and the lamp unit cover securely.
- If you are having difficulty attaching the lamp unit, remove it first and then push it in again slowly. Pushing it in quickly or forcibly may break the connector.

Fig. 1

Fig. 2
1) Set the switch to and disconnect the power plug from the power outlet.
- Wait at least one hour and check if the lamp unit has cooled down.
2) Remove the lamp unit cover. (Fig. 1)
- Use a Phillips screwdriver to turn the lamp unit cover fixing screw (x1) counterclockwise until it turns freely, and open the lamp unit cover slowly in the direction of the arrow.
- Opening the lamp unit cover quickly may damage the cover.
- If you loosen the lamp unit cover fixing screw with the projector installed upward in the vertical direction, the lamp unit cover may open on its weight and may be dropped off.
3) Remove the lamp unit. (Fig. 2)
- Use a Phillips screwdriver to turn the lamp unit fixing screws (x3) counterclockwise until they turn freely, and then remove the lamp unit.
- Hold the handles of the lamp unit and remove it straight.
4) Push in the new lamp unit while paying attention to the insertion position.
- If you are having difficulty attaching the lamp unit, remove it first and then push it in again slowly. Pushing it in quickly or forcibly may break the connector.
5) Use a Phillips screwdriver to firmly tighten the lamp unit fixing screws (x3 each).
- Make sure to attach the lamp unit securely.
6) Attach the lamp unit cover.
i) Perform Step 2) in the reverse order to close the lamp unit cover.
- Attach the lamp unit cover so that the connector on the lamp unit cover is inserted to the fan power connector securely.
ii) Use a Phillips screwdriver to firmly tighten the lamp unit cover fixing screw (x1).
- Make sure to attach the lamp unit cover securely.
Note
- When you replace the lamp unit with new one, the projector resets the runtime of the lamp unit automatically.
Air filter
When the dust remains after cleaning, it is time to replace the air filter.
The air filter for the replacement (TMZX5229) is an optional accessory (service part). To purchase the product, consult your dealer.
When replacing the lamp unit, it is recommended to replace the air filter as well.
The optional Replacement lamp unit (Model No.: ET-LAD70 (1 pc), ET-LAD70W (2 pcs)) comes with one air filter.
How to replace the air filter
Attention
- Make sure to turn off the power before replacing the air filter.
- When attaching the air filter, make sure that the projector is stable, and perform the replacement in a safe place even if you drop the air filter.
1) Remove the air filter.
- Refer to "Removing the air filter" (→ page 164).
2) Replace the air filter with the new one and attach the air filter case to the projector.
- Refer to "Attaching the air filter" (→ page 165).
Attention
- Before switching on the projector, make sure that the air filter is attached. If it is not attached, the projector will suck in dirt and dust causing a malfunction.
- If you use the projector without attaching the air filter case, the filter indicator blinks in red and the message appears on the projected image for approximately 30 seconds.
Troubleshooting
Review the following points. For details, see the corresponding pages.
| Problems Points to | be checked Page | |
| Power does not turn on. | Is the power plug firmly inserted into the outlet? —Is theswitch set to?Is the wall outlet supplying electricity? —Have the circuit breakers tripped? —Are the lamp indicatoror the temperature indicatorlit or blinking?Is the lamp unit cover attached securely? | 61162167 |
| No image appears. | Are connections to external devices correctly performed?Is the input selection setting correct? 67Is the [BRIGHTNESS] adjustment setting at a minimum?Is the external device that is connected to the projector working properly?Is the shutter function in use? 66If the power indicatoris blinking in red, consult your dealer.Is the lens cover still attached to the lens? | 4976——56 |
| Image is fuzzy. | Is the lens focus set correctly?Is the projection distance appropriate?Is the lens dirty?Is the projector installed perpendicular to the screen? | 623221— |
| Color is pale or grayish. | Are [COLOR] and [TINT] adjusted correctly?Is the external device connected to the projector adjusted correctly?Is the RGB cable damaged? | 7749— |
| Remote control does not respond. | Are the batteries depleted?Is the polarity of the batteries set correctly?Are there any obstructions between the remote control and the remote control signal receiver of the projector?Is the remote control being used beyond its effective operation range?Are other forms of light, such as fluorescent light, affecting the projection?Is the [REMOTE CONTROL] setting in [CONTROL DEVICE SETUP] set to [DISABLE]?Is theterminal used for contact control?Is the ID number setting operation correct? | —2824242413518469 |
| Menu screen does not appear. | Is the on-screen display function turned off (hidden)? | 104 |
| Buttons on the control panel do not operate. | Is the [CONTROL PANEL] setting in [CONTROL DEVICE SETUP] set to [DISABLE]?Is theterminal used for contact control? | 135184 |
| Image does not display correctly. | Is the [SYSTEM SELECTOR] selection set correctly?Is the [RGB1 INPUT SETTING] setting performed correctly?Is there a problem with the video tape or other image sources?Is a signal which is not compatible with the projector being input? | 8198—186 |
| Image from a computer does not appear. | Is the cable too long? (For D-Sub cables, the cable length should be 10 m (32'10") or shorter.)Is the external video output on the laptop computer set correctly? (Ex.: The external output settings may be switched by pressing the “Fn” + “F3” or “Fn” + “F10” simultaneously. Since the method varies depending on the computer type, refer to the user manual provided with your computer.) | — |
| Image output from DVI-D of the computer does not appear. | Is the [EDID SELECT] setting in [DVI-D IN] set to [EDID3] or [EDID2:PC]?The graphics accelerator driver of the computer may need to be updated to the latest version.The condition may be improved by making the [EDID SELECT] setting in [DVI-D IN] and then restarting the computer. | 99—99 |
| Video from HDMI compatible device does not appear or it appears jumbled. | Is the HDMI cable connected securely?Turn the power of the projector and the external device off and on.Is a signal which is not compatible with the projector being input? | 49—186 |
| Lens shift cannot be adjusted | Perform [LENS CALIBRATION].Is the fixed-focus lens (Model No.: ET-DLE055) attached? | 125— |
Chapter 5 Maintenance — Troubleshooting
| Problems Points to | be checked Page | |
| Cannot control the projector with Art-Net. | Are the connections between the twisted-pair-cable transmitter and the projector or an external device correctly done?Is [Art-Net SETUP] set to other than [OFF]?Are the [NET], [SUB NET], [UNIVERSE], and [START ADDRESS] settings correct? | —141141 |
| The DIGITAL LINK input image is not displayed. | Are the connections between the twisted-pair-cable transmitter and the projector or an external device correctly done?Is [DIGITAL LINK MODE] set to [AUTO] or [DIGITAL LINK]? Is it set to [ETHERNET]?Is a signal which is not compatible with a twisted-pair-cable transmitter being input? | —138— |
Attention
- If problems persist even after checking the preceding points, consult your dealer.
[SELF TEST] indications
Details and measures for the alphanumeric symbols indicated in [SELF TEST] from the [PROJECTOR SETUP] menu → [STATUS] (→ page 122) are as follows.
| Self-test indication Details Measure | |
| U04 Filter clog | Replace the air filter. | |
| U11 | Intake air temperature warning | The operating environment temperature is too high. Install the projector in a location with the operating environment temperature between 0 °C (32 °F) and 45 °C (113 °F). |
| U12 Optical module temperature warning |
| U13 Exhaust air temperature warning |
| U14 Low temperature warning | The operating environment temperature is too low. Install the projector in a location with the operating environment temperature between 0 °C (32 °F) and 45 °C (113 °F). |
| U15 Light output limitation | Install the projector in a location with the operating environment temperature of 40 °C (104 °F) or lower. |
| U21 | Intake air temperature error | The operating environment temperature is too high. Install the projector in a location with the operating environment temperature between 0 °C (32 °F) and 45 °C (113 °F). |
| U22 Optical module temperature error |
| U23 Exhaust air temperature error |
| U24 Low temperature error | The operating environment temperature is too low. Install the projector in a location with the operating environment temperature between 0 °C (32 °F) and 45 °C (113 °F). |
| U30 | Portrait warning | Install the projector horizontally (within ±15°). |
| U41 | Lamp 1 runtime warning | It will reach the lamp replacement time. Replace the lamp unit. |
| U42 Lamp 2 runtime warning |
| U51 Lamp 1 failure | Wait a while until the luminous lamp cools off, and then turn on the power. |
| U52 Lamp 2 failure |
| U61 Lamp 1 runtime exceeded | It has reached the lamp replacement time. Replace the lamp unit. |
| U62 Lamp 2 runtime exceeded |
| U71 Lamp 1 not attached | Attach the lamp unit. |
| U72 Lamp 2 not attached |
| U76 | Air filter not attached | Attach the air filter case. |
| U81 Low AC voltage warning (below 90 V) | The input power supply voltage is low. Use electric wiring that can sufficiently withstand the power consumption of the projector. |
| U91 Cover open | Securely close the cover. | |
| H01 Battery replacement for the built-in clock | Battery replacement is required. Consult your dealer. |
| H11 Intake air temperature sensor not present | If the display does not clear after switching the main power off and on, consult your dealer. |
| H12 Optical module temperature sensor not present |
| H13 Exhaust air temperature sensor not present |
| H14 Lamp 1 temperature sensor not present |
| H15 Lamp 2 temperature sensor not present |
| H18 Clog sensor not present |
| F00 Liquid cooling pump warning | If the display does not clear after switching the main power off and on, consult your dealer. |
| F11 | Shutter error |
| F15 Brightness sensor error |
| F41 Lamp memory 1 not initialized |
| F42 Lamp memory 2 not initialized |
| F50 DMD fan warning |
| F51 Lamp 1 fan warning |
| F52 Lamp 2 fan warning |
| F53 Exhaust fan 1 warning |
| F54 Exhaust fan 2 warning |
| F55 Color wheel fan warning |
| F56 Power supply fan warning |
| F57 Ballast fan warning |
| F61 Ballast 1 communication error |
| F62 Ballast 2 communication error |
Chapter 5 Maintenance — [SELF TEST] indications
| Self-test indication Details Measure | |
| F85 Color wheel error (FM) | •If the display does not clear after switching the main power off and on, consult your dealer. |
| F86 Color wheel error (FPGA) |
| F90 FPGA configuration error |
| F91 FPGA1 configuration error |
| F92 FPGA2 configuration error |
| F96 Lens mounter error |
| F97 Geometric adjustment board communication error |
| FE1 DMD fan error | •If the display does not clear after switching the main power off and on, consult your dealer. |
| FE2 Lamp 1 fan error |
| FE3 Lamp 2 fan error |
| FE4 Exhaust fan 1 error |
| FE5 Exhaust fan 2 error |
| FE6 Color wheel fan error |
| FE7 Power supply fan error |
| FE8 Ballast fan error |
| FJ0 Liquid cooling pump error | •If the display does not clear after switching the main power off and on, consult your dealer. |
Note
- The self-test indication and the details of the malfunction may vary.
Chapter 6 Appendix
This chapter describes specifications and after-sales service for the projector.
PJLink protocol
The network function of this projector supports the PJLink class 1, and the PJLink protocol can be used to perform projector setting and projector status query operations from a computer.
Control commands
The following table lists the PJLink protocol commands that can be used to control the projector.
- x characters in tables are non-specific characters.
| Command Control details Parameter / return string Remark | |
| POWR Power supply control | 0 Standby1 Power on | |
| POWR? | Power supply status query | 0 Standby1 Power on2 Preparing for switching off3 Warm-up | the projector |
| INPT Input selection | 11 RGB112 RGB231 DVI-D32 HDMI33 DIGITAL LINK34 SDI (Only for PT-DZ780) | |
| INPT? Input selection query |
| AVMT Shutter control 30 Shutter function disabled (shutter: open)AVMT? | Shutter status query | 31 | Shutter function enabled (shutter: closed) |
| ERST? | Error status query | xxxxxx | 1st byte | Indicates fan errors, and returns 0 - 2. | 0 = No error is detected1 = Warning2 = Error |
| 2nd byte | Indicates lamp errors, and returns 0 - 2. |
| 3rd byte | Indicates temperature errors, and returns 0 - 2. |
| 4th byte | Indicates cover open errors, and returns 0 or 2. |
| 5th byte | Indicates filter errors, and returns 0 - 2. |
| 6th byte | Indicates other errors, and returns 0 - 2. |
| LAMP? Lamp status query xxxxxxxxxxxxxxxxxxx | 1st number (1 - 5 digits): Lamp 1 runtime2nd number: 0 = Lamp 1 off, 1 = Lamp 1 on3rd number (1 - 5 digits): Lamp 2 runtime4th number: 0 = Lamp 2 off, 1 = Lamp 2 on |
| INST? Input selection list query | 11 12 31 32 33 34 | Only for PT-DZ780 |
| 11 12 31 32 33 | Only for PT-DW750, PT-DX820 |
| NAME? | Projector name query | xxxxx | Returns the name set in [PROJECTOR NAME] of [NETWORK SETUP]. |
| INF1? | Manufacturer name query | Panasonic | Returns manufacturer name. |
| INF2? | Model name query | DZ780DW750DX820 | Returns model name. |
| INF0? | Other information queries | xxxxx | Returns information such as version number. |
| CLSS? | Class information query | 1 | Returns class for PJLink. |
PJLink security authentication
The password used for PJLink is the same as that of the password set for web control.
When using the projector without security authentication, do not set a password for web control.
- For specifications related to PJLink, refer to the website of Japan Business Machine and Information System Industries Association.
URL http://pjlink.jbmia.or.jp/english/
Using Art-Net function
Since the network function of the projector supports the Art-Net function, you can control the projector settings with the DMX controller or application software using the Art-Net protocol.
Channel definition
The following table lists the channel definitions used for controlling the projector with the Art-Net function.
Channel settings can be switched using the [NETWORK] menu → [Art-Net SETUP] → [ON(2.X.X.X)]/[ON(10.X.X.X)]/[ON(MANUAL)] → [CHANNEL SETUP]. (→ page 141)
The control content assigned to each channel is as the following table.
- Channel assignment for [USER] is in factory setting. Assignment can be changed.
| Channel | Control details |
| [DEFAULT] [USER] [DZ870/DZ21K] | |
| CHANNEL1 LIGHT OUTPUT | LENS H SHIFT | LENS H SHIFT LENS CONTROL | |
| CHANNEL2 INPUT SELECT | LENS V SHIFT | LENS V SHIFT POWER | |
| CHANNEL3 LENS POSITION | LENS FOCUS | LENS FOCUS | LIGHT OUTPUT |
| CHANNEL4 | LENS ZOOM | LENS ZOOM ENABLE / DISABLE | |
| CHANNEL5 | POWER | NONE | |
| CHANNEL6 | GEOMETRY | GEOMETRY | NONE |
| CHANNEL7 | CUSTOM MASKING | CUSTOM MASKING | CUSTOM MASKING |
| CHANNEL8 POWER | ENABLE / DISABLE | ENABLE / DISABLE | GEOMETRY |
| CHANNEL9 | NONE | NONE | NONE |
■ Control content
| Control details | Performance | Parameter | Default value | Remark |
| LIGHT OUTPUT | 100 % | 0 | 0 | Can be set in 256 steps between 100 % and 0 %. |
| ... | ... |
| 0 % | 255 |
| SHUTTER | SHUTTER: Open | 0-63 | 128 | — |
| No operation | 64-191 |
| SHUTTER: Close | 192-255 |
| INPUT SELECT (when [DZ870/ DZ21K] is selected) | No operation | 0-7 | 0 | — |
| RGB1 | 8-15 |
| RGB2 | 16-23 |
| No operation | 24-31 |
| DVI-D | 32-39 |
| HDMI | 40-47 |
| DIGITAL LINK | 48-55 |
| SDI (Only for PT-DZ780) | 56-63 |
| No operation | 64-127 |
| P IN P execution, USER1 | 128-135 |
| P IN P execution, USER2 | 136-143 |
| P IN P execution, USER3 | 144-151 |
| No operation | 152-255 |
Chapter 6 Appendix — Technical information
| Control details Performance Parameter Default value Remark | | |
| INPUT SELECT (when [DEFAULT] or [USER] is selected) | No operation 0-7 | | 0 — | |
| RGB1 8-15 | |
| RGB2 16-23 | |
| DVI-D 24-31 | |
| HDMI 32-39 | |
| DIGITAL LINK 40-47 | |
| SDI (Only for PT-DZ780) 48-55 | |
| No operation 56-127 | |
| Execute P IN P, USER1 128-135 | |
| Execute P IN P, USER2 136-143 | |
| Execute P IN P, USER3 144-151 | |
| No operation 152-255 | |
| LENS POSITION | No operation 0-31 | | 0 | "Move to the home position" is an operation when [NORMAL] is selected in [HOME POSITION] of the [HOME POSITION] screen. "Move to the ET-DLE030 standard lens position" is an operation when [DLE030] is selected in [HOME POSITION] of the [HOME POSITION] screen. |
| Move to the home position | 32-63 |
| Move to the ET-DLE030 standard lens position |
| No operation 64-255 | |
| LENS H SHIFTLENS V SHIFTLENS FOCUSLENS ZOOM | Lens adjustment | (-) High speed 0-31 | 128 — | |
| (-) Low speed | 32-63 |
| (-) Fine adjustment | 64-95 |
| Operation stop | 96-159 |
| Lens adjustment | (+) Fine adjustment | 160-191 |
| (+) Low speed | 192-223 |
| (+) High speed 2 | 24-255 |
| LENS FUNCTION SELECT (when [DZ870/DZ21K] is selected) | No operation 0-15 | | 0 | Operate together with LENS CONTROL. "Move to the home position" is an operation when [NORMAL] is selected in [HOME POSITION] of the [HOME POSITION] screen. "Move to the ET-DLE030 standard lens position" is an operation when [DLE030] is selected in [HOME POSITION] of the [HOME POSITION] screen. |
| LENS H SHIFT | 16-31 |
| LENS V SHIFT | 32-47 |
| LENS FOCUS | 48-63 |
| LENS ZOOM | 64-79 |
| Move to the home position | 80-95 |
| Move to the ET-DLE030 standard lens position |
| No operation 96-255 | |
| LENS CONTROL (when [DZ870/DZ21K] is selected) | Lens adjustment | (-) High speed 0-31 | 100 | Operate together with LENS FUNCTION SELECT. |
| (-) Low speed | 32-63 |
| (-) Fine adjustment | 64-95 |
| Operation stop | 96-127 |
| Lens adjustment | (+) Fine adjustment | 128-159 |
| (+) Low speed | 160-191 |
| (+) High speed 1 | 92-223 |
| Execute command action | 224-255 |
| POWER No operation 64-191 | Standby | 0-63 | 128 — | |
| |
| Power on | 192-255 |
| CUSTOM MASKING | OFF | 0-31 | 255 | (Only for PT-DZ780) To use PC-1, PC-2, and PC-3, the optional Upgrade Kit (Model No.: ET-UK20) is required. |
| PC-1 | 32-63 |
| PC-2 | 64-95 |
| PC-3 | 96-127 |
| No operation 128-255 | |
Chapter 6 Appendix — Technical information
| Control details Performance Parameter Default value Remark | | |
| GEOMETRY | OFF 0-15 | | 255 | To use PC-1, PC-2, and PC-3, the optional Upgrade Kit (Model No.: ET-UK20) is required. |
| KEYSTONE 16-31 | |
| CURVED 32-47 | |
| PC-1 (Only for PT-DZ780) 48-63 | |
| PC-2 (Only for PT-DZ780) 64-79 | |
| PC-3 (Only for PT-DZ780) 80-95 | |
| CORNER CORRECTION 96-111 | |
| No operation 112-255 | |
| FREEZE | No operation 0-31 | | 128 — | |
| OFF 32-95 | |
| No operation 96-159 | |
| ON 160-223 | |
| No operation 224-255 | |
| COLOR TINT | No operation 0-31 | | 0 — | |
| Factory default setting 32-63 | |
| -31 | 64-65 |
| ... | ... |
| 0 | 128-129 |
| ... | ... |
| +31 | 190-191 |
| No operation 192-255 | |
| RASTER PATTERN | No operation 0-15 | | 0 — | |
| OFF 16-31 | |
| WHITE | 32-47 |
| YELLOW | 48-63 |
| CYAN | 64-79 |
| GREEN | 80-95 |
| MAGENTA | 96-111 |
| RED | 112-127 |
| BLUE | 128-143 |
| BLACK | 144-159 |
| USER LOGO | 160-175 |
| No operation 176-255 | |
| ENABLE / DISABLE | Disable | 0-127 | 0 | When “Disable” is set, operations of all channels become unacceptable. |
| Enable | 128-255 |
Note
- If the projector is operated with the remote control or on the control panel, or by the control command while controlling the projector using the Art-Net function, the setting of the DMX controller or computer application may be different from the projector status. To reflect the controls of all channels to the projector, set "ENABLE / DISABLE" of channel 11 to "Disable" and then set back to "Enable".
- To create/register the USER LOGO image, use "Logo Transfer Software" included in the supplied CD-ROM.
Control commands via LAN
When web control administrator rights password is set (Protect mode)
Connecting
1) Obtain the IP address and port number (Initial set value = 1024) of the projector and request a connection to the projector.
- You can obtain both the IP address and the port number from the menu screen of the projector.
| IP address | Obtain from the [NETWORK] menu → [NETWORK STATUS] |
| Port number | Obtain from the [NETWORK] menu → [NETWORK CONTROL] → [COMMAND PORT] |
2) Check the response from the projector.
Chapter 6 Appendix — Technical information
| Data section Blank | Mode Blank | Random number section | | Termination symbol |
| Command example | “NTCONTROL” (ASCII string) | ‘’ 0x20 | ‘1’ 0x31 | ‘’ 0x20 | “zzzzzzzz” (ASCII code hex number) (CR) 0x0d |
| Data length 9 | bytes 1 byte 1 byte 1 byte | 8 bytes 1 byte | | | |
- Mode: 1 = Protect mode
- Example: Response during protect mode (random number section is undefined value) "NTCONTROL 1 23181e1e" (CR)
3) Generate a 32-byte hash value from the following data using MD5 algorithm.
- "xxxxxx:yyyyMMddy:zzzzzzzzz"
| xxxxxx Administrator rights user name for the web control (default user name is “admin1”) |
| yyyy Password of above administrator rights user (default password is “panasonic”) |
| zzzzzzzz 8-byte random number obtained in Step 2) |
Command transmission method
Transmit using the following command formats.
■ Transmitted data
| Header | Data section | Termination symbol |
| Command example | Hash value(Refer to “Connecting” above) | ‘0’0x30 | ‘0’0x30 | Control command(ASCII string) | (CR)0x0d |
| Data length | 32 bytes | 1 byte | 1 byte | Undefined length | 1 byte |
- Example: Transmission of power supply status acquisition command (hash value is calculated from default user name, password, and acquired random number)
"dbdd2dabd3d4d68c5dd970ec0c29fa6400QPW" (CR)
■ Received data
| Header | Data section | Termination symbol |
| Command example | ‘0’0x30 | ‘0’0x30 | Control command(ASCII string) | (CR)0x0d |
| Data length | 1 byte | 1 byte | Undefined length | 1 byte |
- Example: The projector is powered on "00001" (CR)
■ Error response
| String | Details | Termination symbol |
| Message | “ERR1” | Undefined control command | (CR)0x0d |
| “ERR2” | Out of parameter range |
| “ERR3” | Busy state or no-acceptable period |
| “ERR4” | Timeout or no-acceptable period |
| “ERR5” | Wrong data length |
| “ERRA” | Password mismatch |
| Data length | 4 bytes | — | 1 byte |
When web control administrator rights password is not set (Non-protect mode)
Connecting
1) Obtain the IP address and port number (Initial set value = 1024) of the projector and request a connection to the projector.
- You can obtain both the IP address and the port number from the menu screen of the projector.
| IP address | Obtain from the [NETWORK] menu → [NETWORK STATUS] |
| Port number | Obtain from the [NETWORK] menu → [NETWORK CONTROL] → [COMMAND PORT] |
2) Check the response from the projector.
| Data section Blank Mode | | | Termination symbol |
| Command example | “NTCONTROL” (ASCII string) | ‘’ 0x20 | ‘0’ 0x30 | (CR) 0x0d |
| Data length 9 | bytes 1 byte 1 byte 1 byte | | | |
- Mode: 0 = Non-protect mode
•Example: Response during non-protect mode
"NTCONTROL 0" (CR)
Command transmission method
Transmit using the following command formats.
■Transmitted data
| Header Data section | | Termination symbol |
| Command example | ‘0’0x30 | ‘0’0x30 | Control command(ASCII string) | (CR)0x0d |
| Data length | 1 byte | 1 byte | Undefined length | 1 byte |
- Example: Transmission of power supply status acquisition command "00QPW" (CR)
■Received data
| Header Data section | | Termination symbol |
| Command example | ‘0’0x30 | ‘0’0x30 | Control command(ASCII string) | (CR)0x0d |
| Data length | 1 byte | 1 byte | Undefined length | 1 byte |
- Example: The power of the projector is in standby status "00000" (CR)
■Error response
| String | Details | Termination symbol |
| Message | “ERR1” | Undefined control command | (CR)0x0d |
| “ERR2” | Out of parameter range |
| “ERR3” | Busy state or no-acceptable period |
| “ERR4” | Timeout or no-acceptable period |
| “ERR5” | Wrong data length |
| “ERRA” | Password mismatch |
| Data length | 4 bytes | — | 1 byte |
/ terminal
The / terminal of the projector conforms with RS-232C so that the projector can be connected to and controlled from a computer.
Connection
Single projector

Multiple projectors

flowchart
graph LR
A["Computer"] --> B["D-Sub 9p (male) D-Sub 9p (female)"]
B --> C["D-Sub 9p (female) D-Sub 9p (male)"]
C --> D["D-Sub 9p (male) D-Sub 9p (male)"]
D --> E["Connecting terminals on projector 1"]
E --> F["Computer"]
G["Connecting terminals on projector 2"] --> H["D-Sub 9p (male) D-Sub 9p (male)"]
H --> I["D-Sub 9p (male) D-Sub 9p (male)"]
I --> J["Communication cable"]
To connect to DIGITAL LINK compatible devices

flowchart
graph LR
A["Projector connecting terminals"] --> B["DIGITAL LINK DIGITAL LINK"]
B --> C["LAN cable (straight)"]
B --> D["D-Sub 9p (female)"]
D --> E["D-Sub 9p (male)"]
E --> F["Communication cable (straight)"]
G["Computer"] --> F
Note
- The destination of [RS-232C] (→ page 121) must be set according to the connection method.
- When connecting by a DIGITAL LINK compatible device, set the [PROJECTOR SETUP] menu → [STANDBY MODE] (→ page 118) setting to [NORMAL] to control the projector during standby.
When [STANDBY MODE] is set to [ECO], the projector cannot be control during standby.
Pin assignments and signal names
| D-Sub 9-pin (female) Outside view | Pin No. Signal name Details | |
 | (1) — NC | | |
| (2) TXD Transmitted data | |
| (3) | RXD | Received data |
| (4) — NC | | |
| (5) | GND | Earth |
| (6) — NC | | |
| (7) CTS | | Connected internally |
| (8) RTS | |
| (9) — NC | | |
Chapter 6 Appendix — Technical information
| D-Sub 9-pin (male) Outside view | Pin No. Signal name Details | |
 | (1) — NC | |
| (2) RXD Received data | |
| (3) TXD Transmitted data | |
| (4) — NC | |
| (5) GND Earth | |
| (6) — NC | |
| (7) RTS | |
| (8) CTS | |
| (9) — NC | |
Communication conditions (Factory default)
| Signal level RS-232C-compliant |
| Sync. method Asynchronous |
| Baud rate | 9 600 bps |
| Parity | None |
| Character length | 8 bits |
| Stop bit | 1 bit |
| X parameter | None |
| S parameter | None |
Transmission from the computer starts with STX, then the ID, command, parameter, and ETX are sent in this order. Add parameters according to the details of control.

flowchart
graph TD
A["Start (1 byte)"] --> B["STX"]
B --> C["A D (2 bytes)"]
B --> D["I1 I2"]
D --> E["2 ID characters (2 bytes)"]
D --> F[";"]
F --> G["C1 C2 C3"]
G --> H["Semi-colon (1 byte)"]
G --> I["Colon (1 byte)"]
I --> J["P1 P2 ~ Pn"]
J --> K["End (1 byte)"]
J --> L["ETX"]
style A fill:#f9f,stroke:#333
style K fill:#ccf,stroke:#333
note right of A: ID designate
note right of B: ZZ, 01 to 64 and 0A to 0Z
note right of D: Semi-colon (1 byte)
note right of G: 3 command characters (3 bytes)
Basic format (has subcommands)

flowchart
graph TD
A["STX"] --> B["Sub command (5 bytes)"]
C["ETX"] --> D["Sub command (5 bytes)"]
E["S1"] --> F["Operation (1 byte)'"]
G["S2"] --> F
H["S3"] --> F
I["S4"] --> F
J["S5"] --> F
K["E"] --> L["Parameter (6 bytes)'"]
M["P1"] --> N["Symbol “+” or “-” (1 byte) and setting or adjustment value (5 bytes)"]
O["P2"] --> P["“=” (Set the value specified using parameter)"]
Q["P3"] --> P
R["P4"] --> P
S["P5"] --> P
T["P6"] --> P
U["ATX"] --> V["Same as the basic format"]
V --> W["ETX"]
*1 When transmitting a command which does not need a parameter, an operation (E) and parameter are not necessary.
Attention
- If a command is transmitted after the lamp starts illuminating, there may be a delay in response or the command may not be executed. Try sending or receiving any command after 60 seconds.
- When transmitting multiple commands, be sure to wait until 0.5 seconds has elapsed after receiving the response from the projector before sending the next command. When transmitting a command which does not need a parameter, a colon (:) is not necessary.
Note
- If a command cannot be executed, the "ER401" response is sent from the projector to the computer.
- If an invalid parameter is sent, the "ER402" response is sent from the projector to the computer.
- ID transmission in RS-232C supports ZZ (ALL) and 01 to 64, as well as 0A to 0Z groups.
- If a command is sent with a specified ID, a response will be sent to the computer only in the following cases.
-It matches the projector ID
-ID setting is set to ALL and [RESPONSE(ID ALL)] is [ON]
-ID setting is set to GROUP and [RESPONSE(ID GROUP)] is [ON]
- STX and ETX are character codes. STX shown in hexadecimal is 02, and ETX shown in hexadecimal is 03.
When multiple projectors are controlled
When multiple projectors are all controlled
When controlling multiple projectors together via RS-232C, perform the following settings.
1) Set a different ID for each projector.
2) Set [RESPONSE(ID ALL)] to [ON] in only one projector.
3) Set [RESPONSE(ID ALL)] to [OFF] for all other projectors set in Step 2).
When multiple projectors are all controlled by group unit
When controlling multiple projectors by group unit via RS-232C, perform the following settings.
1) Set a different ID for each projector.
2) Set [RESPONSE(ID GROUP)] to [ON] in only one projector.
3) Set [RESPONSE(ID GROUP)] to [OFF] for all other projectors set in Step 2).
Note
- There will be no response if two or more projectors have [RESPONSE(ID ALL)] set to [ON].
- There will be no response if two or more projectors of the same group have [RESPONSE(ID GROUP)] set to [ON].
- When setting multiple groups, set [RESPONSE(ID ALL)] to [ON] in only one projector in each group.
Cable specification
When connected to a computer

When multiple projectors are connected

Control command
The following table lists the commands that can be used to control the projector using a computer.
■Projector control command
| Command Details | Parameter/response string | Remark (parameter) |
| PON Power on | — To check if the power is on, use the “Power query” command. |
| POF Power standby |
| QPW Power query | 000001 | STANDBYPower on |
| IIS | Switching the input signal | RG1 RGB1RG2 RGB2DVI DVI-DHD1 HDMIDL1 DIGITAL LINKSD1 SDI (Only for PT-DZ780) | |
| QSL Query for lamp selection | 0 DUAL1 SINGLE2 LAMP13 LAMP2 | |
| LPM Lamp selection | 0 DUAL1 SINGLE2 LAMP13 LAMP2 | *1 |
| QSL Query for lamp runtime | 1 LAMP12 LAMP2 | Response is 0000 to 4000 |
| OLP Lamp power | 0 NORMAL1 ECO | |
| OSH Shutter control | 0 OPEN | | |
| QSH Shutter status query | 1 CLOSE | | |
| VSE Aspect ratio switch | 0 DEFAULT/VID AUTO1 4:32 16:95 THROUGH6 HV FIT9 H FIT10 | V FIT |
| QSE | Aspect ratio settings query |
| OPP P IN | P execution | 0 OFF1 USER12 USER23 USER3 | |
| QPP P IN | P setting query |
| OCS Sub | memory switch | 01 - 96 | Sub memory number |
| QSB | Sub memory status query |
*1 The lamp 1 or the lamp 2, whichever has a shorter runtime, is used.
■Projector control command (with sub command)
| Command | Sub command | Details | Remark |
| VXX RYCI1 | RGB 1 input setting | +00000=RGB/YP | _BP_R, +00001=Y/C, +00002=VIDEO |
■ Lens control command
| Command | Sub command | Details | Remark |
| VXX LNS12 | Lens | H shift | +00000 = Fine adjustment 1+, +00001 = Fine adjustment 1-, +00100 = Fine adjustment 2+, +00101 = Fine adjustment 2-, +00200 = Coarse adjustment+, +00201 = Coarse adjustment- |
| VXX LNS13 | Lens | V shift |
| VXX LNS14 | Lens | focus |
| VXX LNS15 | Lens | zoom |
terminal
It is possible to control the projector remotely (by external contact) from a control panel located away from the projector where remote control signals cannot reach.
Use the terminal on the connecting terminals of the projector to connect to the control panel.

flowchart
graph TD
A["Remote control Contact control"] --> B["Remote control/contact control"]
B --> C["Standby Lit"]
C --> D["Lamp"]
D --> E["RGB1 DIGITAL LINK"]
D --> F["RGB2 HDMI"]
D --> G["DVI-D"]
Installation locations such as a meeting room Remote control board in another location
Pin assignments and signal names
| D-Sub 9-pinOutside view | Pin No. Signal name Open (H) Short (L) | | |
 | (1) GND — GND | | |
| (2) POWER OFF ON | | |
| (3) | RGB1 | Other | RGB1 |
| (4) | RGB2 | Other | RGB2 |
| (5) | DIGITAL LINK | Other | DIGITAL LINK |
| (6) | HDMI | Other | HDMI |
| (7) | DVI-D | Other | DVI-D |
| (8) | SHUTTER | OFF | ON |
| (9) | RST/SET | Controlled by remote control | Controlled by external contact |
Attention
- When controlling, make sure to short-circuit pins (1) and (9).
- When pins (1) and (9) are short-circuited, the following buttons on the control panel and the remote control are disabled. Commands for RS-232C and network functions corresponding to these functions are also disabled.
- Power on <|> button, power standby <@> button, button
- When pins (1) and (9) are short-circuited, and then any pins from (3) to (7) and the pin (1) are short-circuited, the following buttons on the control panel and the remote control are disabled. Commands for RS-232C and network functions corresponding to these functions are also disabled.
- Power on <|> button, power standby <∅> button, button, button, button, button,
Note
- For pin (2) to pin (8) settings, you can make changes if you set [REMOTE2 MODE] to [USER]. (→ page 124)
Two-window display combination list
√: P IN P (picture in picture) combination is possible
▲: P IN P (picture in picture) combination is possible through the same frequency signal
—: P IN P (picture in picture) combination is not possible
| Sub window |
| RGB1 RGB2 | |
| Main window RGB Movie | | *1 | Y/C input | VIDEO input | RGB Movie | *1 |
| RGB1 | RGB — — — — | | | | | √ | √ |
| Movie*1 | — — — — | | | | √ | ▲ |
| Y/C input — — — | | | | | √ | ▲ |
| VIDEO input — — — | | | | | √ | ▲ |
| RGB2 | RGB | √√√√ | | | | — | — |
| Movie*1 | √▲▲▲ | | | | — | — |
| DVI-D | RGB*2 | √√√√√√ | | | | | |
| Movie*3 | √▲▲▲√▲ | | | | | |
| HDMI | RGB*2 | √√√√√√ | | | | | |
| Movie*3 | √▲▲▲√▲ | | | | | |
| SDI*4 | √▲▲▲√▲ | | | | | |
| DIGITAL LINK | RGB*2 | — — — — — | | | | | |
| Movie*3 | — — — — — | | | | | |
| Sub window |
| DVI-D HDMI | | SDI*4 | DIGITAL LINK |
| Main window RGB | *2 | Movie*3 | RGB*2 | Movie*3 | RGB*2 | Movie*3 |
| RGB1 | RGB | ✓✓✓✓✓ | | | | — | — |
| Movie*1 | ✓▲✓▲▲ | | | | — | — |
| Y/C input | ✓▲✓▲▲ | | | | — | — |
| VIDEO input | ✓▲✓▲▲ | | | | — | — |
| RGB2 | RGB | ✓✓✓✓✓ | | | | — | — |
| Movie*1 | ✓▲✓▲▲ | | | | — | — |
| DVI-D | RGB*2 | — | — | ✓✓✓ | | — | — |
| Movie*3 | — | — | ✓▲▲ | | — | — |
| HDMI | RGB*2 | ✓ | ✓ | ——— | | | |
| Movie*3 | ✓ | ▲ | ——— | | | |
| SDI*4 | ✓ | ▲ | ——— | | | |
| DIGITAL LINK | RGB*2 | ——— | ——— | | | | | |
| Movie*3 | ——— | ——— | | | | | |
*1 480i, 480p, 576i, 576p, 720/60p, 720/50p, 1080/60i, 1080/50i, 1080/24sF, 1080/24p, 1080/25p, 1080/30p, 1080/50p, 1080/60p
*2 VGA (640 x 480) - WUXGA (1 920 x 1 200)
Non-interlace signal, dot clock frequency: 25 MHz to 162 MHz (The WUXGA signal is only compatible with VESA CVT RB (Reduced Blanking) signals.)
*3 Only supports 480p, 576p, 720/60p, 720/50p, 1080/60i, 1080/50i, 1080/24sF, 1080/24p, 1080/25p, 1080/30p, 1080/50p, and 1080/60p
*4 Only for PT-DZ780
Note
- In the combination of , if P IN P function is used with the signals of a different frequency, images in the sub window will not be displayed.
Control device password
To initialize your password, consult your distributor.
Upgrade Kit
(Only for PT-DZ780)
If the optional Upgrade Kit (Model No.: ET-UK20) is applied, the following functions are extended.
| Function Standard status When the Upgrade Kit is applied | |
| Adjustment range of [VERTICAL KEYSTONE] | Maximum of ± 40^ × 1 | Maximum of ± 45^ × 1 |
| Adjustment range of [HORIZONTAL KEYSTONE] | Maximum of ± 15^ × 1 | Maximum of ± 40^ × 1 |
| Adjustment range of [CURVED] | Vertical arc, Maximum ± 50^ × 1 Horizontal arc, Maximum ± 50^ × 1 | Vertical arc, Maximum ± 100^ × 1 Horizontal arc, Maximum ± 100^ × 1 |
| [CUSTOM MASKING] Cannot be used. The image is masked in optional form. | |
| [PC CORRECTION] of [UNIFORMITY] | Cannot be used. Correct the brightness and color unevenness of the entire screen. |
*1 The adjustment range of the menu. Refer to “[GEOMETRY] projection range” ( page 34) for the possible projection range.
List of compatible signals
The following table specifies the video signals compatible with the projector.
- Symbols that indicate formats are as follows.
-V: VIDEO, Y/C
-R: RGB
-Y: Y_BC_R/YP_BP_R
-D: DVI-D
-H: HDMI
-S: SDI (Only for PT-DZ780)
| Mode | Resolution(Dots) | Scanning freq. | Dot clockfreq.(MHz) | Format | Plug and play ^1 |
| Horizontal(kHz) | Vertical(Hz) | RGB2 | DVI-D | HDMI |
| EDID1 | EDID2 | EDID3 |
| NTSC/NTSC4.43/PAL-M/PAL60 | 720 x 480i 15.7 | 59.9 — V | — — — | — — | | | | | | |
| PAL/PAL-N/SECAM | 720 x 576i 15.6 | 50.0 — V | — — — | — — | | | | | | |
| 525i (480i) | 720 x 480i | 15.7 | 59.9 | 13.5 | R/Y/S | — | — | — | — | — |
| 625i (576i) | 720 x 576i | 15.6 | 50.0 | 13.5 | R/Y/S | — | — | — | — | — |
| 525i (480i) | 720 (1440) x 480i ^2 | 15.7 | 59.9 | 27.0 | D/H | — | — | — | — | — |
| 625i (576i) | 720 (1440) x 576i ^2 | 15.6 | 50.0 | 27.0 | D/H | — | — | — | — | — |
| 525p (480p) | 720 x 483 | 31.5 | 59.9 | 27.0 | R/Y/D/H | — | √ | — | √ | √ |
| 625p (576p) | 720 x 576 | 31.3 | 50.0 | 27.0 | R/Y/D/H | — | √ | — | √ | √ |
| 750 (720)/60p | 1 280 x 720 | 45.0 | 60.0 | 74.3 | R/Y/D/H/S | — | √ | — | √ | √ |
| 750 (720)/50p | 1 280 x 720 | 37.5 | 50.0 | 74.3 | R/Y/D/H/S | — | √ | — | √ | √ |
| 1125 (1080)/60 ^13 | 1 920 x 1 080i | 33.8 | 60.0 | 74.3 | R/Y/D/H/S | — | √ | — | √ | √ |
| 1125 (1080)/50i | 1 920 x 1 080i | 28.1 | 50.0 | 74.3 | R/Y/D/H/S | — | √ | — | √ | √ |
| 1125 (1080)/24p | 1 920 x 1 080 | 27.0 | 24.0 | 74.3 | R/Y/D/H/S | — | √ | — | √ | √ |
| 1125 (1080)/24sF | 1 920 x 1 080i | 27.0 | 48.0 | 74.3 | R/Y/D/H/S | — | — | — | — | — |
| 1125 (1080)/25p | 1 920 x 1 080 | 28.1 | 25.0 | 74.3 | R/Y/D/H/S | — | √ | — | √ | — |
| 1125 (1080)/30p | 1 920 x 1 080 | 33.8 | 30.0 | 74.3 | R/Y/D/H/S | — | — | — | — | — |
| 1125 (1080)/60p | 1 920 x 1 080 | 67.5 | 60.0 | 148.5 | R/Y/D/H/S | — | √ | — | √ | √ |
| 1125 (1080)/50p | 1 920 x 1 080 | 56.3 | 50.0 | 148.5 | R/Y/D/H/S | — | √ | — | √ | √ |
| VESA400 | 640 x 400 | 31.5 | 70.1 | 25.2 | R/D/H | — | — | — | — | — |
| 640 x 400 | 37.9 | 85.1 | 31.5 | R/D/H | — | — | — | — | — |
| VGA480 | 640 x 480 | 31.5 | 59.9 | 25.2 | R/D/H | √ | √ | √ | √ | √ |
| 640 x 480 | 35.0 | 66.7 | 30.2 | R/D/H | — | — | — | — | — |
| 640 x 480 | 37.9 | 72.8 | 31.5 | R/D/H | √ | — | √ | √ | √ |
| 640 x 480 | 37.5 | 75.0 | 31.5 | R/D/H | √ | — | √ | √ | √ |
| 640 x 480 | 43.3 | 85.0 | 36.0 | R/D/H | — | — | — | — | — |
Chapter 6 Appendix — Technical information
| Mode | Resolution(Dots) | Scanning freq. | Dot clockfreq.(MHz) | Format | Plug and play ^1 |
| Horizontal(kHz) | Vertical(Hz) | RGB2 | DVI-D | HDMI |
| EDID1 | EDID2 EDID3 |
| SVGA | 800 x 600 35.2 | 56.3 36.0 | R/D/H | | | √ | — | √√√ | |
| 800 x 600 37.9 | 60.3 40.0 | R/D/H | | | √ | — | √√√ | |
| 800 x 600 48.1 | 72.2 50.0 | R/D/H | | | √ | — | √√√ | |
| 800 x 600 46.9 | 75.0 49.5 | R/D/H | | | √ | — | √√√ | |
| 800 x 600 53.7 | 85.1 56.3 | R/D/H — | — — — — | | | | | |
| MAC16 832 x 624 | 49.7 74.6 57.3 R/D/H | | | | | √ | — | √√√ | |
| XGA | 1 024 x 768 39.6 | 50.0 51.9 | R/D/H — | — — — — | | | | | |
| 1 024 x 768 48.4 | 60.0 65.0 | R/D/H | | | √ | — | √√√ | |
| 1 024 x 768 56.5 | 70.1 75.0 | R/D/H | | | √ | — | √√√ | |
| 1 024 x 768 60.0 | 75.0 78.8 | R/D/H | | | √ | — | √√√ | |
| 1 024 x 768 65.5 | 81.6 86.0 | R/D/H — | — — — — | | | | | |
| 1 024 x 768 68.7 | 85.0 94.5 | R/D/H — | — — — — | | | | | |
| 1 024 x 768 81.4 | 100.0 11 | 3.3 R/D/H | — — — — — | | | | | |
| 1 024 x 768 98.8 | 120.0 13 | 9.1 | R/D/H | | √ | — | √√√ | |
| MXGA | 1 152 x 864 53.7 | 60.0 81.6 | R/D/H — | — — — — | | | | | |
| 1 152 x 864 64.0 | 70.0 94.2 | R/D/H — | — — — — | | | | | |
| 1 152 x 864 | 67.5 | 74.9 | 108.0 | R/D/H | — | — | — | — |
| 1 152 x 864 77.1 | 85.0 | 119.7 | R/D/H — — — — — | | | | | |
| MAC21 | 1 152 x 870 | 68.7 | 75.1 | 100.0 | R/D/H | √ | — | √√√ | |
| 1280 x 720 | 1 280 x 720 37.1 | 49.8 60.5 | R/D/H — | — — — — | | | | | |
| 1 280 x 720 44.8 | 59.9 74.5 | R/D/H — | — — — — | | | | | |
| 1 280 x 720 76.3 | 100.0 13 | 1.8 | R/D/H — — — — | | | | | |
| 1 280 x 720 92.6 | 120.0 16 | 1.6 | R/D/H — — — — | | | | | |
| 1280 x 768 | 1 280 x 768 39.6 | 49.9 65.3 | R/D/H — | — — — — | | | | | |
| 1 280 x 768 47.8 | 59.9 79.5 | R/D/H — | — — — — | | | | | |
| 1 280 x 768 ^4 | 47.4 60.0 | 68.3 R/D/H — — — — — | | | | | | |
| 1 280 x 768 | 60.3 | 74.9 | 102.3 | R/D/H | — | — | — | — |
| 1 280 x 768 68.6 | 84.8 | 117.5 | R/D/H — — — — — | | | | | |
| 1280 x 800 | 1 280 x 800 41.3 | 50.0 68.0 | R/D/H — | — — — — | | | | | |
| 1 280 x 800 49.7 | 59.8 83.5 | R/D/H | | | √*5 | — | √*5 | √*5 |
| 1 280 x 800 ^4 | 49.3 59.9 | 71.0 R/D/H — — — — — | | | | | | |
| 1 280 x 800 | 62.8 | 74.9 | 106.5 | R/D/H | — | — | — | — |
| 1 280 x 800 | 71.6 | 84.9 | 122.5 | R/D/H | — | — | — | — |
| MSXGA | 1 280 x 960 | 60.0 | 60.0 | 108.0 | R/D/H | — | — | — | — |
| SXGA | 1 280 x 1 024 | 52.4 50.0 | 88.0 R/D/H — — — — — | | | | | | |
| 1 280 x 1 024 | 64.0 | 60.0 | 108.0 | R/D/H | — | — | — | — |
| 1 280 x 1 024 | 72.3 | 66.3 | 125.0 | R/D/H | — | — | — | — |
| 1 280 x 1 024 | 78.2 | 72.0 | 135.1 | R/D/H | — | — | — | — |
| 1 280 x 1 024 | 80.0 | 75.0 | 135.0 | R/D/H | √ | — | √√√ | |
| 1 280 x 1 024 | 91.1 | 85.0 | 157.5 | R/D/H | — | — | — | — |
| 1366 x 768 | 1 366 x 768 47.7 | 59.8 85.5 | R/D/H — | — — — — | | | | | |
| 1 366 x 768 39.6 | 49.9 69.0 | R/D/H — | — — — — | | | | | |
| SXGA+ | 1 400 x 1 050 | 54.1 50.0 | 99.9 R/D/H — — — — — | | | | | | |
| 1 400 x 1 050 | 64.0 | 60.0 | 108.0 | R/D/H | — | — | — | — |
| 1 400 x 1 050 | 65.2 | 60.0 | 122.6 | R/D/H | √ | — | √√√ | |
| 1 400 x 1 050 | 65.3 | 60.0 | 121.8 | R/D/H | — | — | — | — |
| 1 400 x 1 050 | 78.8 | 72.0 | 149.3 | R/D/H | — | — | — | — |
| 1 400 x 1 050 | 82.2 | 75.0 | 155.9 | R/D/H | — | — | — | — |
| WXGA+ | 1 440 x 900 | 55.9 | 59.9 | 106.5 | R/D/H | — | — | — | — |
| 1 440 x 900 46.3 | 49.9 86.8 | R/D/H — | — — — — | | | | | |
| 1600 x 900 | 1 600 x 900 46.4 | 49.9 96.5 | R/D/H — | — — — — | | | | | |
| 1 600 x 900 55.9 | 60.0 | 119.0 R/D/H | | | √ | — | √√√ | |
| UXGA | 1 600 x 1 200 | 61.8 | 49.9 | 131.5 | R/D/H | — | — | — | — |
| 1 600 x 1 200 | 75.0 | 60.0 | 162.0 | R/D/H | √ | — | √√√ | |
Chapter 6 Appendix — Technical information
| Mode | Resolution(Dots) | Scanning freq. | Dot clockfreq.(MHz) | Format | Plug and play*1 |
| Horizontal(kHz) | Vertical(Hz) | RGB2 | DVI-D | HDMI |
| EDID1 | EDID2 | EDID3 |
| WSXGA+ | 1 680 x 1 050 65 | 3 60.0 14 | 6.3 R/D/H | — — — — — | | | | | | |
| 1 680 x 1 050 54 | 1 50.0 11 | 9.5 R/D/H | — — — — — | | | | | | |
| 1920 x 1080 | 1 920 x 1 080 55 | 6 49.9 14 | 1.5 R/D/H | — — — — — | | | | | | |
| 1 920 x 1 080*4 | 66.6 59 | 9.9 138.5 | R/D/H — — — — — | | | | | | |
| 1 920 x 1 080*6 | 67.2 60 | 0.173.0 | R — — — — — | | | | | | |
| WUXGA | 1 920 x 1 200 61 | 8 49.9 15 | 8.3 R/D/H | — — — — — | | | | | | |
| 1 920 x 1 200*4 | 74.0 60 | 0.154.0 | R/D/H | | √ | — | √ | √*7 | √*7 |
| 1 920 x 1 200*6 | 74.6 59 | 9.9 193.3 | R — — — — — | | | | | | |
*1 Signals with a √ in the Plug and play columns are signals described in EDID (extended display identification data) of the projector. If a signal has no √ in the Plug and play columns but has an entry in the Format column, it can be input. For signals without a √ in the Plug and play columns, there are instances when resolution cannot be selected on the computer even though the projector supports them.
*2 Pixel-Repetition signal (dot clock frequency 27.0 MHz) only
*3 When a 1125 (1035)/60i signal was input, it is displayed as a 1125 (1080)/60i signal.
*4 VESA CVT-RB (Reduced Blanking)-compliant
*5 Only for PT-DW750
*6 Samples the pixels in the image processing circuit and projects the image.
*7 Only for PT-DZ780
Note
- The display dot for PT-DZ780 is 1920 x 1200, the display dot for PT-DW750 is 1280 x 800, and the display dot for PT-DX820 is 1024 x 768. A signal with a different resolution is converted to the number of display dots.
- The "i" at the end of the resolution indicates an interlaced signal.
- When interlaced signals are connected, flickering may occur on the projected image.
- DIGITAL LINK input compatible signal is the same as HDMI input compatible signal.
Specifications
The specifications of the projector are as follows.
| Power supply | PT-DZ780B, PT-DZ780W, PT-DZ780LB, PT-DZ780LW, PT-DW750B, PT-DW750W, PT-DW750LB, PT-DW750LW, PT-DX820B, PT-DX820W, PT-DX820LB, PT-DX820LW | 100 V - 240 V ~ (100 V - 240 V alternating current), 50 Hz/60 Hz (9.0 A - 4.0 A) |
| PT-DZ780BD, PT-DZ780WD, PT-DZ780LBD, PT-DZ780LWD, PT-DW750BD, PT-DW750WD, PT-DW750LBD, PT-DW750LWD |
| PT-DZ780BT, PT-DW750BT, PT-DX820BT | 110 V ~ (110 V alternating current), 60 Hz (8.0 A) |
| Power consumption | PT-DZ780B, PT-DZ780W, PT-DZ780LB, PT-DZ780LW, PT-DW750B, PT-DW750W, PT-DW750LB, PT-DW750LW, PT-DX820B, PT-DX820W, PT-DX820LB, PT-DX820L | 790 W |
| PT-DZ780BD, PT-DZ780WD, PT-DZ780LBD, PT-DZ780LWD, PT-DW750BD, PT-DW750WD, PT-DW750LBD, PT-DW750LWD |
| PT-DZ780BT, PT-DW750BT, PT-DX80BT 785 W | |
| PT-DZ780B, PT-DZ780W, PT-DZ780LB, PT-DZ780LW, PT-DW750B, PT-DW750W, PT-DW750LB, PT-DW750LW, PT-DX820B, PT-DX820W, PT-DX820LB, PT-DX820LW | Approx. 0.3 W when [STANDBY MODE] is set to [ECO] | |
| PT-DZ780BD, PT-DZ780WD, PT-DZ780LBD, PT-DZ780LWD, PT-DW750BD, PT-DW750WD, PT-DW750LBD, PT-DW750LWD | |
| PT-DZ780BT, PT-DW750BT, PT-DX820BT | Approx. 0.2 W when [STANDBY MODE] is set to [ECO] |
| Approx. 3 W when [STANDBY MODE] is set to [NORMAL] |
| DLP chip | Size | PT-DZ780 17 mm (0.67") (aspect ratio 16:10) |
| PT-DW750 16.5 mm (0.65") (aspect ratio 16:10) |
| PT-DX820 17.8 mm (0.7") (aspect ratio 4:3) |
| Display system 1-unit DLP chip, DLP type |
| Number of pixels | PT-DZ780 2 304 000 pixels (1 920 x 1 200 dots) |
| PT-DW750 1 024 000 pixels (1 280 x 800 dots) |
| PT-DX820 786 432 pixels (1 024 x 768 dots) |
| Lens*1 | Electric zoom | PT-DZ780 1.7 - 2.4:1 | |
| PT-DW750, PT-DX820 1.8 - 2.5:1 | |
| Electric focus | F = 1.7 - 1.9f = 25.6 mm - 35.7 mm |
| Luminous lamp 310 W UHM lamp x 2 |
| Light output*2*3 | PT-DZ780, PT-DW750 7 000 lm (ANSI) |
| PT-DX820 8 200 lm (ANSI) | |
| Contrast ratio*3 | PT-DZ780, PT-DW750 3 000:1 | |
| PT-DX820 2 400:1 | |
| Color system 7 standards (NTSC/NTSC4.43/PAL/PAL-N/PAL-M/SECAM/PAL60) |
| Projected image size*4 | 1.27 m (50") to 15.24 m (600") |
| Image aspect ratio | PT-DZ780, PT-DW750 16:10 | |
| PT-DX820 4:3 | |
| Projection method [FRONT/CEILING], [FRONT/FLOOR], [REAR/CEILING], [REAR/FLOOR] |
| Power cable length 3.0 m (118-1/8") |
| Outer case Molded plastic | |
| Outer color | White model White | |
| Black model Black | |
*1 The lens for PT-DZ780L series, PT-DW750L series, and PT-DX820L series is sold separately.
*2 Value is for the supplied standard zoom lens. The value varies depending on the lens.
*3 Measurement, measuring conditions and method of notation all comply with ISO21118 international standards.
*4 When the lens ET-DLE055 is used, the maximum size is 5.08 m (200"). When the lens ET-DLE030 is used, the maximum size is 2.54 m (100") to 8.89 m (350").
Chapter 6 Appendix — Specifications
| Dimensions | Width 498 mm (19-19/32") |
| Height 175 mm (6-7/8") (with legs at shortest position) |
| Depth | PT-DZ780, PT-DW750, PT-DX820 | 521 mm (20-1/2") (including standard zoom lens) |
| PT-DZ780L, PT-DW750L, PT-DX820L | 498 mm (19-19/32") (excluding lens mount cover and optional lens) |
| Weight | PT-DZ780, PT-DW750, PT-DX820 | Approx. 17.8 kg (39.3 lbs.)*1 (including standard zoom lens) |
| PT-DZ780L, PT-DW750L, PT-DX820L | Approx. 17.0 kg (37.5 lbs.)*1 (excluding lens mount cover and optional lens) |
| Noise level*2 | 30 dB |
| Operating environment | Operating environment temperature*3 | 0 °C (32 °F) to 45 °C (113 °F) |
| Operating environment humidity | 10 % to 80 % (no condensation) |
| Remote control | Power supply DC | 3 V (AAA/R03 battery x 2) |
| Operating range | Within approx. 30 m (98'5") (when operated directly in front of signal receiver) |
| Weight | 102 g (3.6 ozs.) (including batteries) |
| Dimensions | Width: 48 mm (1-7/8"), Height: 145 mm (5-23/32"), Depth: 27 mm (1-1/16") |
*1 Average value. Weight varies for each product.
*2 Measurement, measuring conditions and method of notation all comply with ISO21118 international standards.
*3 When using the projector at high altitudes (between 1 400 m (4 593') and 2 700 m (8 858') above sea level), the operating environment temperature should be between 0 °C (32 °F) and 40 °C (104 °F).
If the [PROJECTOR SETUP] menu → [LAMP SELECT] is set to [DUAL], and [LAMP POWER] is set to [NORMAL], the light output may be reduced by approximately 20 % to protect the projector when the operating environment temperature becomes 40 °C (104 °F) or higher (35 °C (95 °F) or higher when using the projector at high altitudes).
■Applicable scanning frequency
Refer to "List of compatible signals" ( page 186) for the types of video signals that can be used with the projector.
| For video signal | Horizontal: 15.73 kHz, Vertical: 59.94 Hz; Horizontal: 15.63 kHz, Vertical: 50 Hz |
| For Y/C signal |
| For RGB signal | Horizontal: 15 kHz to 100 kHz, Vertical: 24 Hz to 120 HzPIAS (Panasonic Intelligent Auto Scanning) system |
| Dot clock frequency: 162 MHz or less |
| For YC_BC_R/YP_BP_R signal | 525i (480i)Horizontal: 15.73 kHz, Vertical: 59.94 Hz525p (480p)Horizontal: 31.47 kHz, Vertical: 59.94 Hz750 (720)/60pHorizontal: 45 kHz, Vertical: 60 Hz1125 (1035)/60iHorizontal: 33.75 kHz, Vertical: 60 Hz1125 (1080)/50iHorizontal: 28.13 kHz, Vertical: 50 Hz1125 (1080)/24sFHorizontal: 27 kHz, Vertical: 48 Hz1125 (1080)/30pHorizontal: 33.75 kHz, Vertical: 30 Hz1125 (1080)/50pHorizontal: 56.25 kHz, Vertical: 50 HzThe SYNC/HD and VD terminals do not support 3 value SYNC. | 625i (576i)Horizontal: 15.63 kHz, Vertical: 50 Hz625p (576p)Horizontal: 31.25 kHz, Vertical: 50 Hz750 (720)/50pHorizontal: 37.5 kHz, Vertical: 50 Hz1125 (1080)/60iHorizontal: 33.75 kHz, Vertical: 60 Hz1125 (1080)/24pHorizontal: 27 kHz, Vertical: 24 Hz1125 (1080)/25pHorizontal: 28.13 kHz, Vertical: 25 Hz1125 (1080)/60pHorizontal: 67.5 kHz, Vertical: 60 Hz |
| For DVI-D signal | 525i (480i)*1, 625i (576i)*1, 525p (480p), 625p (576p), 750 (720)/60p, 750 (720)/50p, 1125 (1080)/60i, 1125 (1080)/50i, 1125 (1080)/24p, 1125 (1080)/24sF, 1125 (1080)/25p, 1125 (1080)/30p, 1125 (1080)/60p, 1125 (1080)/50p |
| Displayable resolution: VGA to WUXGA (non-interlaced)Dot clock frequency: 25 MHz to 162 MHz |
| For HDMI signal | 525i (480i)*1, 625i (576i)*1, 525p (480p), 625p (576p), 750 (720)/60p, 750 (720)/50p, 1125 (1080)/60i, 1125 (108O)/50i, 1125 (1080)/24p, 1125 (1080)/24sF, 1125 (1080)/25p, 1125 (1080)/30p, 1125 (1080)/60p, 1125 (1080)/50p |
|
| For SDI signal(Only for PT-DZ780) | SD-SDI signal SMPTE ST 259 compliant YC_BC_R 4:2:2 10-bit480i, 576iSingle link HD-SDI signal SMPTE ST 292 compliant YP_BP_R 4:2:2 10-bit720/50p, 720/60p, 1035/60i, 1080/50i, 1080/60i, 1080/25p, 1080/24p, 1080/24sF, 1080/30p3G-SDI signal SMPTE ST 424 compliant YP_BP_R 4:2:2 10-bit1080/50p, 1080/60pRGB 4:4:4 12-bit/10-bit1080/50i, 1080/60i, 1080/25p, 1080/24p, 1080/24sF, 1080/30p |
*1 Pixel-Repetition signal (dot clock frequency 27.0 MHz) only
Note
- DIGITAL LINK input compatible signal is the same as HDMI input compatible signal.
Terminal
| 1 set (BNC x 5 (RGB/YP _B P _R /YC _B C _R /YC/VIDEO x 1))RGB signal 0.7 V [p-p] 75 Ω (SYNC ON GREEN: 1.0 V [p-p] 75 Ω)SYNC/HD TTL high impedance, automatic positive/negative polarity compatibleVD TTL high impedance, automatic positive/negative polarity compatibleYP _B P _R signal Y: 1.0 V [p-p] including synchronization signal, P _B P _R : 0.7 V [p-p] 75 ΩY/C signal Y: 1.0 V [p-p], C: 0.286 V [p-p] 75 ΩVIDEO signal BNC: 1.0 V [p-p], 75 Ω |
| 1 set, high-density D-Sub 15 p (female)RGB signal 0.7 V [p-p] 75 Ω (SYNC ON GREEN: 1.0 V [p-p] 75 Ω)SYNC/HD TTL high impedance, automatic positive/negative polarity compatibleVD TTL high impedance, automatic positive/negative polarity compatibleYP _B P _R signal Y: 1.0 V [p-p] including synchronization signal, P _B P _R : 0 .7 V [p-p] 75 Ω |
| 24 p, single link, DVI 1.0 compliant, HDCP compatible |
| 19 p, HDCP compatible, Deep Color compatible |
| 1 set (BNC)SD-SDI signal SMPTE ST 259 compliantHD-SDI signal SMPTE ST 292 compliant3G-SDI signal SMPTE ST 424 compliant |
| D-Sub 9 p, 1 set each, RS-232C compliant, for computer control |
| M3 stereo mini jack, 1 set each, for remote control (wired)/for projector connection control |
| D-Sub 9 p, for contact control |
| 1 set, RJ-45, for network and DIGITAL LINK connections, PJLink compatible, 100Base-TX, Art-Net compatible |
| USB connector (type A) x 1, for power supply only (DC 5 V, maximum 900 mA) |
Note
- The model numbers of accessories and optional accessories are subject to change without prior notice.
Dimensions
Unit: mm

* The above dimensions are obtained when the standard zoom lens is attached.
* Actual dimensions may differ depending on the product.
Precautions for attaching the Ceiling Mount Bracket
- When installing the projector to the ceiling, be sure to use the optional Ceiling Mount Bracket (Model No.: ET-PKD120H (for high ceilings), ET-PKD120S (for low ceilings), ET-PKD130H (for High Ceilings, 6-axis Adjustment), ET-PKD130B (Projector Mount Bracket)) specified by Panasonic. The Ceiling Mount Bracket (Model No.: ET-PKD120H (for high ceilings), ET-PKD120S (for low ceilings), ET-PKD130H (for High Ceilings, 6-axis Adjustment)) is used in combination with the Ceiling Mount Bracket (Model No.: ET-PKD130B (Projector Mount Bracket)).
- When installing the projector, attach the drop-prevention set that comes with the ceiling mount bracket to the projector. When the drop-prevention kit (Service Model No.: TTRA0214) is necessary, consult your dealer.
- Ask a qualified technician to do the installation work such as mounting the projector on the ceiling.
- Panasonic takes no responsibility for any damage to the projector resulting from use of a ceiling mount bracket not manufactured by Panasonic or the inappropriate choice of location for installation, even if the warranty period of the projector has not expired.
- Unused products must be removed promptly by a qualified technician.
- Use a torque screwdriver or Allen torque wrench to tighten bolts to their specified tightening torques. Do not use electric screwdrivers or impact screwdrivers.
- Read the Installation Instructions for the ceiling mount bracket for details.
- The model numbers of accessories and optional accessories are subject to change without prior notice.
Bottom view
Model No. of Ceiling Mount Bracket: ET-PKD120H (for high ceilings)
ET-PKD120S (for low ceilings)
ET-PKD130H (for High Ceilings, 6-axis Adjustment)
ET-PKD130B (Projector Mount Bracket)

Index
A
| Accessories |
| terminal 25, 55 |
| Adjusting adjustable feet | 46 |
| [ADVANCED MENU] | 73, 88 |
| [AI] | 81 |
| Air filter | 164 |
| Art-Net | 20, 175 |
| [Art-Net SETUP] | 141 |
| [ASPECT] | 83 |
| Automatic setup function | 68 |
| [AUTO SETUP] | 96 |
| button |
| Projector body | 26, 68 |
| Remote control | 24, 68 |
| [AUTO SIGNAL] | 96 |
B
| [BACK COLOR] | |
| [BACKUP INPUT SETTING] | 97 |
| [BLANKING] | 88 |
| [BRIGHTNESS] | 76 |
| [BRIGHTNESS CONTROL] | 114 |
C
| Cautions on use |
| Cautions when installing | 18 |
| Cautions when transporting | 18 |
| Ceiling Mount Bracket | 194 |
| [CLAMP POSITION] | 89 |
| [CLOCK PHASE] | 85 |
| [CLOSED CAPTION SETTING] | 106 |
| [COLOR] | 77 |
| [COLOR CORRECTION] | 95 |
| [COLOR MATCHING] | 94 |
| [COLOR TEMPERATURE] | 77 |
| Connecting the power cord | 55 |
| Connecting the remote control to the projector with a cable | 29 |
| Connection | 49 |
| [CONTRAST] | 76 |
| [CONTROL DEVICE PASSWORD CHANGE] | 136 |
| [CONTROL DEVICE SETUP] | 135 |
| [COOLING CONDITION] | 112 |
| [Crestron Connected(TM)] | 158 |
| [CUT OFF] | 110 |
D
| [DATE AND TIME] |
| button |
| Remote control | 24,72 |
| Deleting the registered signal | 131 |
| [ DIGITAL CINEMA REALITY ] | 88 |
| DIGITAL LINK | 20 |
| button |
| Projector body | 26,67 |
| Remote control | 24,67 |
| [ DIGITAL LINK IN ] | 102 |
| [ DIGITAL LINK MENU ] | 141 |
| [ DIGITAL LINK MODE ] | 138 |
| [ DIGITAL LINK SETUP ] | 138 |
| [ DIGITAL LINK STATUS ] | 139 |
| Dimensions | 193 |
| Display language | 74,93 |
| [ DISPLAY OPTION ] | 74,94 |
| [ DISPLAY SETTING ] | 134 |
| Disposal | 21 |
| button |
| Projector body | 26,67 |
| Remote control | 24,67 |
| [ DVI-D IN ] | 99 |
E
| Early Warning Software |
| [EDGE BLENDING] | 90 |
| <ENTER> button |
| Projector body | 26 |
| Remote control | 24 |
| Expanding signal lock-in range | 132 |
F
| Filter indicator |
| button |
| Remote control 24, 62 |
| [FRAME RESPONSE] | 91 |
| [FREEZE] | 108 |
| Function button | 68 |
| button |
| Remote control 24, 68 |
G
H
| <HDMI> button |
| Projector body | 26, 67 |
| Remote control | 24, 67 |
| [HDMI IN] | 101 |
|
| <ID SET> buttonRemote control......24,69 |
| [INITIALIZE]...... | 126 |
| Initial settings...... | 57 |
| [INITIAL STARTUP]...... | 120 |
| [INPUT RESOLUTION]...... | 89 |
| Installation mode...... | 31 |
L
| Lamp indicator |
| [LAMP POWER] | 113 |
| [LAMP RELAY] | 113 |
| [LAMP SELECT] | 21 |
| button |
| Projector body | 26, 62 |
| [LENS CALIBRATION] | 125 |
| List of compatible signals | 186 |
| [LOAD ALL USER DATA] | 126 |
M
| Main menu |
| Main power switch | 25, 56 |
| Maintenance | 164 |
|
| Projector body | 26, 71 |
| Remote control | 24, 71 |
| Menu item | 73 |
N
| Navigating through the menu |
| [NETWORK] | 75, 138 |
| Network connection | 142 |
| [NETWORK CONTROL] | 140 |
| [NETWORK SETUP] | 139 |
| [NETWORK STATUS] | 140 |
| [NOISE REDUCTION] | 80 |
| [NO SIGNAL SHUT-OFF] | 124 |
0
| <ON SCREEN> button |
| Remote control | 24, 66 |
| [ON-SCREEN DISPLAY] | 104 |
| On-screen menu | 71 |
| Optional accessories | 23 |
P
| [PICTURE] | |
| [PICTURE MODE] | 76 |
| [P IN P] | 75, 128 |
| P IN P function | 128 |
| [POSITION] | 73, 83 |
| Power cord | 55 |
| Power indicator | 55 |
| Power on button | |
| Projector body | 26 |
| Remote control | 24 |
| Power standby button | |
| Projector body | 26 |
| Remote control | 24 |
| Precautions for attaching the Ceiling Mount |
| Bracket | 194 |
| Precautions for use | 18 |
| Projecting | 62 |
| [PROJECTION METHOD] | 111 |
| Projector body | 25 |
| [PROJECTOR ID] | 111 |
| [PROJECTOR SETUP] | 74, 111 |
| Protecting the registered signal | 132 |
R
| [RASTER POSITION] | 92 |
| Read this first! | 5 |
| Registering new signals | 131 |
|
|
|
|
| [REMOTE2 MODE] | 124 |
| Remote control | 24 |
| Remote control operations | 66 |
| Removing/attaching the projection lens | 47 |
| Renaming the registered signal | 131 |
| Replacement | 166 |
| Replacing the air filter | 168 |
| Replacing the lamp unit | 166 |
| Resetting to the factory default | 72 |
|
| button |
| Remote control | 24, 67 |
|
| button |
| Projector body | 26, 67 |
|
| button |
| Projector body | 26, 67 |
| [RGB IN] | 98 |
| [RS-232C] | 121, 180 |
S
[SAVE ALL USER DATA] 126
[SCHEDULE] 119
[SCREEN SETTING] 95
| button 162 |
| Projector body | 26, 67 |
| Remote control | 24, 67 |
| [SDI IN] | 103 |
| Security | 20 |
| [SECURITY] | 75, 134 |
| [SECURITY PASSWORD] | 134 |
| [SECURITY PASSWORD CHANGE] | 134 |
| Selecting the input signal | 62 |
| terminal | 180 |
| terminal | 180 |
| [SERVICE PASSWORD] 72 | 127 |
| Setting the remote control ID numbers | 69 |
| Setting up | 31 |
| [SHARPNESS] | 80 |
| [SHIFT] | 83 |
| button |
| Remote control | 24, 62 |
| button |
| Projector body | 26, 66 |
| Remote control | 24, 66 |
| [SHUTTER SETTING] |
| [SIGNAL LIST] | 75, 131 |
| Specifications | 189 |
| sRGB-compliant video | 81 |
| [STANDBY MODE] | 118 |
| [STARTUP INPUT SELECT] | 120 |
| [STARTUP LOGO] | 107 |
| [STATUS] | 122 |
| button |
| Remote control | 24, 67 |
| Sub memory | 133 |
| Switching off the projector | 61 |
| Switching on the projector | 56 |
| Switching the input signal | 67 |
| [SYSTEM DAYLIGHT VIEW] | 80 |
| [SYSTEM SELECTOR] | 81 |
| 73, 76 |
T
| Temperature indicator | 163 |
| [TEST PATTERN] | 75, 130 |
|
| Remote control | 24, 68 |
| [TEXT CHANGE] | 135 |
| [TINT] | 77 |
| Troubleshooting | |
| Two-window | 185 |
U
| [UNIFORMITY] | 107 |
| Upgrade Kit | 186 |
V
| <VIDEO> buttonRemote control 24,67 |
W
| [WAVEFORM MONITOR] | 108 |
| [WHITE GAIN] | 79 |
Z
| [ZOOM] | 84 |
| <ZOOM> button | |
| Remote control | 24, 62 |

These symbols on the products, packaging, and/or accompanying documents mean that used electrical and electronic products and batteries should not be mixed with general household waste. For proper treatment, recovery and recycling of old products and used batteries, please take them to applicable collection points, in accordance with your national legislation and the Directives 2002/96/EC and 2006/66/EC.

By disposing of these products and batteries correctly, you will help to save valuable resources and prevent any potential negative effects on human health and the environment which could otherwise arise from inappropriate waste handling.
For more information about collection and recycling of old products and batteries, please contact your local municipality, your waste disposal service or the point of sale where you purchased the items.
Penalties may be applicable for incorrect disposal of this waste, in accordance with national legislation.

For business users in the European Union
If you wish to discard electrical and electronic equipment, please contact your dealer or supplier for further information.
These symbols are only valid in the European Union. If you wish to discard these items, please contact your local authorities or dealer and ask for the correct method of disposal.
Note for the battery symbol (bottom two symbol examples):
This symbol might be used in combination with a chemical symbol. In this case it complies with the requirement set by the Directive for the chemical involved.

AEEE Yönetmeliğine Uygundur.
Eski Ekipman ve Bataryaların İşlenmesi.
Sadece geri dönüşüm sistemleri olan Avrupa Birliği ve ülkeleri için geçerlidir.
Ürünler, ambalaj ve/veya ekli belgeler üzerindeki bu semboller kullanılmış elektrik ve elektronik ürünlerin ve pillerin genel ev atığı ile karıştırılmaması gerektiğini ifade eder.
Eski ürünlerin ve pillerin toplanması ve geri kazanılması için bu atıkları lütfen yasayla belirlenmiş olan uygun toplama merkezlerine teslim ediniz.
Bu atıkların doğru işlenmesiyle, değerli kaynakların korunmasına ve insan sağlığı ve çevreye olası negatif etkilerinin engellenmesine yardımcı olabilirsiniz.
Atıkların toplanması ve geri dönüşümü için detaylı bilgi için lütfen bağlı olduğunu yerel yönetimlerle iletişime geçiniz.
Atıkların atılmasıyla ilgili yanlış uygulamalar yasayla belirlenmiş olan cezalara sebebiyet verebilir.

Panasonic Corporation
Web Site : http://panasonic.net/avc/projector/
© Panasonic Corporation 2015
Panasonic System Communications Company of North America
5th Floor, Two Riverfront Plaza, Newark, NJ 07102-5490
TEL: (877) 803 - 8492
Panasonic Canada Inc.
5770 Ambler Drive, Mississauga, Ontario L4W 2T3
TEL: (905) 624 - 5010