Product TypeAuto Tracking Server Software (application software for Windows)
Language of ManualEnglish (EN)
Main FunctionsTracking assist for persons, simultaneous tracking by up to 4 remote cameras per server, auto detection of tracking target via face recognition and deep learning, setting display position and zoom magnification during tracking, PTZ control, preset registration/calling, image adjustment (Focus, Iris, Gain, WB, Shutter, ND Filter)
Compatible Remote CamerasPanasonic AW-UE150, AW-UE70, AW-HE130, AW-HE40, AW-HE42, AW-UE4
Operating System (Server)Windows Server 2012 R2, Windows Server 2016, Windows Server 2019, Windows 10
Operating System (Client)Any OS with Google Chrome web browser
Hardware Requirements (Server)CPU: Xeon E5-2640 v4 2.40 GHz 1P/10C or above; Memory: 8 GB or above
GPU Requirements (for Deep Learning GPU mode)NVIDIA GeForce GTX 1080 or later (Pascal), NVIDIA Quadro P4000 or later, NVIDIA GeForce RTX 2080/2080Ti (Turing), NVIDIA Quadro RTX 4000 or later; CUDA Toolkit required
Client PC RequirementsCPU: Core i5-2520M 2.50 GHz or above; Memory: 4 GB or above; Display: 1920 x 1080 or above
License TypePaid software with 90-day trial period; license per camera connection
Maximum Number of Cameras (Trial)16 cameras
Maximum Number of Cameras (Licensed)Depends on license purchased
Network ConnectionWired network recommended between server and remote cameras
Face RecognitionRegister face data (up to 10 faces per image) for specific target tracking; auto face search option
Tracking MethodsTemplate matching, Deep Learning (CPU), Deep Learning (GPU)
PTZ LimitationsPan/Tilt working range limitation can be set; not available for AW-UE4
Preset PositionsUp to 9 presets per camera
Image Capture TypesJPEG or H.264 stream
Web InterfaceAccessible via Google Chrome browser; login screen, View and Main screens
User Account RolesAdministrator, Super User, User (with configurable access rights)
Category ManagementGroup cameras into categories for filtered display
Multi-Server ConfigurationMaster/Slave architecture to increase number of controlled cameras

Frequently Asked Questions - AW-SF200Z PANASONIC

What is the Panasonic AW-SF200Z?
The Panasonic AW-SF200Z is Auto Tracking Server Software that runs on Windows and enables automatic person tracking using Panasonic remote cameras.
Which Panasonic cameras are compatible with AW-SF200Z?
Compatible cameras include AW-UE150, AW-UE70, AW-HE130, AW-HE40, AW-HE42, and AW-UE4.
What are the minimum PC requirements for the server?
Server requires Xeon E5-2640 v4 CPU or higher, 8 GB RAM, and Windows Server 2012 R2/2016/2019 or Windows 10. For deep learning GPU mode, a compatible NVIDIA GPU and CUDA Toolkit are needed.
Is the software free to use?
The software offers a 90-day free trial. After trial, a paid license is required per camera connection.
How many cameras can be tracked simultaneously?
Up to 4 cameras per server. Multiple servers can be combined (Master/Slave) to increase capacity. Trial license allows up to 16 cameras.
Can I use face recognition to track a specific person?
Yes, you can register face data (names and photos) and set the software to track only that person using face recognition.
What tracking methods are available?
Three methods: Template matching (low CPU load), Deep Learning (CPU), and Deep Learning (GPU) (requires NVIDIA GPU and CUDA).
How do I connect to a remote camera?
On the View or Main screen, click the Connect button for the camera. Ensure the camera is powered and networked. A wired connection is recommended.
Can I adjust camera settings like zoom and focus?
Yes, the software provides a camera controller for PTZ, zoom, focus, iris, gain, white balance, shutter, and ND filter adjustments.
What should I do if the tracking target is lost?
The software can automatically return to a home position preset after a set duration. You can adjust lost state judgment triggers (body or face detection) and sensitivity.

User questions about AW-SF200Z PANASONIC

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Monitoring Software in PDF format for free! Find your manual AW-SF200Z - PANASONIC and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. AW-SF200Z by PANASONIC.

USER MANUAL AW-SF200Z PANASONIC

Auto Tracking Server Software Operation Manual

Introduction

Auto Tracking Server Software is application software that runs on Windows.

By operating this software on a Windows Server PC to which a Panasonic remote camera is connected, tracking of persons shot by the remote camera can be performed simultaneously by multiple remote cameras.

Main Functions

The main functions of this software are as described below.

1. Tracking assist for persons

The tracking of a person selected from the images shot by the remote camera can be assisted. Stable tracking operation can be performed by the face recognition function that detects the face of the set person, and also by human body detection through deep learning.

2. Simultaneous tracking by multiple remote cameras

The tracking operation can be performed by simultaneously controlling up to four remote cameras per one server. By increasing the number of servers, the number of remote cameras controlled simultaneously can also be increased.

3. Auto detection of tracking target

The face of a person in the images shot by the remote camera can be detected automatically and tracked.

4. Setting the display position of the tracking target

You can set the position on the screen on which the tracking target is to be displayed.

5. Setting the Zoom magnification during tracking

The zoom magnification of the camera image during tracking can be set.

6. PTZ control of the remote camera

Pan/Tilt control and Zoom position control can be performed for the remote camera.

The limitation of the working range of Pan/Tilt can be set or canceled.

7. Registering/calling the remote camera preset

The Pan/Tilt/Zoom position of the remote camera can be registered or called as a preset.

8. Image adjustment of the remote camera

You can adjust the Focus/Iris/Gain/WB/Shutter/ND Filter for the remote camera.

Caution

  • This software detects and tracks a single target, such as the lecturer of a lecture recording, and does not track a single target among several targets, and is also not meant to be used when there are several moving objects within the camera angle.
  • Since this software uses image processing, the target may be wrongly detected. In order to deal with situations where the target is wrongly detected, use this software in an environment in which the correction task can be performed by the operator.
  • Depending on the shooting environment (camera angle, distance, and speed), the camera may not be able to track the target (the tracking target may be lost). In order to deal with situations where the target is lost, use this software in an environment in which the correction task can be performed by the operator.

Operating Environment

The below-mentioned environment is necessary for using this software:

- Server PC

CPU: Xeon E5-2640 v4 2.40 GHz 1P/10C or above

Memory: 8 GB or above

OS: Windows Server 2012 R2

Windows Server 2016

Windows Server 2019

Windows 10

When human body detection is performed through deep learning

GPU

Pascal architecture

NVIDIA GeForce GTX 1080 or later

NVIDIA Quadro P4000 or later

Turing architecture

NVIDIA GeForce RTX 2080/2080Ti

NVIDIA Quadro RTX 4000 or later

or

Xeon CPU with 8 physical cores or more

* If using a GeForce RTX or Quadro RTX for the GPU, please use Windows 10 or Windows Server 2016 for the operating system.

- Client PC

CPU: Core i5-2520M 2.50 GHz or above

Memory: 4 GB or above

Display: 1920 x 1080 or above

Web browser: Google Chrome

- Panasonic remote camera

AW-UE150

AW-UE70

AW-HE130

AW-HE40

AW-HE42

AW-UE4

  • Before using this software, you must install Google Chrome in the client. You may download and install it from the Google site.
  • Use the latest version of the remote camera firmware. You can download the firmware from the following Website:

http://pro-av.panasonic.net/en/

- Panasonic recommends a wired network connection between the server and remote camera. In the case of a wireless connection, sufficient tracking performance may not be achieved.

- When using GPU for human body detection through deep learning, you must install CUDA Toolkit in the server pc.

When using a GPU with Pascal architecture, please install CUDA Toolkit 8.0 referring to the following procedure.

https://eww.pass.panasonic.co.jp/pro-av/support/content/download/DEF/soft/man/CUDA_Toolkit_8.0_InstallationProcedures_jpn.pdf

When using a GPU with Turing architecture, please install CUDA Toolkit 10.1 referring to the following procedure.

https://eww.pass.panasonic.co.jp/pro-av/support/content/download/DEF/soft/man/CUDA_Toolkit_10.1_InstallationProcedures_jpn.pdf

About the Server Configuration

Although this software can operate on one server too, the number of remote cameras that can be controlled simultaneously can be increased by configuring the software with multiple servers.

Among the servers configuring this software, one server is set as the Master server for centralized management, and the remaining are set as the Slave servers for expansion.

For details on the method of setting the server, refer to the Installation Procedures.

About the License

This is paid software.

To enable you to test the functions of the software, we offer a trial period of 90 days from the day of start of the trial of this software. Therefore, you can use it for free during this period, but you must purchase the key code (license) after the expiry of the trial period, and activate the software.

For details, refer to the "License" section of this manual.

About the Descriptions in this File

  • The illustrations and screen displays in this file may be different from those in reality.
  • In this file, a personal computer is mentioned as a "PC".

About Registration and Registered Trademarks

  • Microsoft, Windows, and Internet Explorer are registered trademarks of Microsoft Corporation in the United States.
  • Intel, Intel Core i7, and Intel Xeon are trademarks or registered trademarks of Intel Corporation or its subsidiaries in the United States and other countries.
  • All other names, company names, and product names are trademarks or registered trademarks of each company. TM and the ® mark are not specified in this manual.

Description of Screens

Login Screen

When you connect to the Master server of this software from the Web browser, the Login screen shown below appears.

Auto Tracking Server Software AW-SF200 1 User ID: 2 Password: 3 Login

① User name input

Enter the user name for logging in to this software.

② Password input

Enter the user password.

③ Login button

Log in to the software using the entered user name and password.

- For details on the default user name and password, and user account registration, check "Settings for the Administrator" in the Installation Procedures.

View Screen

The View screen shown below appears when you log in to this software.

The View screen is configured by the following four areas and displays the list of registered remote cameras together with information such as thumbnails, etc.

• View/Main common part
- Camera list display control part
- Camera list display
- Camera controller (when display is ON)

View/Main common part Auto Tracking Server Software View MAIN Logged in as SF 200Admin < Camera Controller Camera 1 Camera 2 Camera 3 Stop Camera 4 Camera list display control part Tracking Camera 5 Tracking Camera 6 Camera 7 Camera 8 GLEN ROBERT VICTOR GLEN Camera 9 Camera 10 Camera 11 Lost Camera 12 Camera 13 Camera 14 Camera 15 Camera 16 OFF OFF OFF OFF

View screen (Camera controller display OFF)

Auto Tracking Server Software View MAIN All 12 Camera 1 JHON Main Disconnect Camera 2 ALEX Main Disconnect Trading Camera 3 ROBERT Main Disconnect Stop Camera 4 WALTER Main Disconnect Tracking Camera 5 GLEN Main Disconnect Tracing Camera 6 ROBERT Main Disconnect Camera 7 VICTOR Main Disconnect Camera 8 GLEN Main Disconnect Camera 9 ROBERT Main Disconnect Camera 10 ANNY Main Disconnect Tracking Camera 11 ROBERT Main Disconnect Last Camera 12 ROBERT Main Disconnect Logged in as $200Admin Camera Controller > PT2 Pan/TRt Last Zoom 1 Focus Far Pan/TRt Slow W New? Auto Image Adjust IRIS GAIN WB SHUTTER NO Auto AWB A OFF Through Auto AWB ABB File Camera Ctrl Next

View screen (Camera controller display ON)

• View/Main common part

The display of the top part of the screen is common in both View screen and Main screen.

1 2 Auto Tracking Server Software VIEW MAIN 3 4 5 logged in as $7200/6mm (8)

① Settings button

Used to move to the Settings screen.

② Help button

Used to display the help file (this document) under another tab of the Web browser.

③ View/Main selection tab

Used to switch between the View screen and Main screen.

④ License status display

Displays the license status of this software.

For details on the license status, refer to the "License" section of this manual.

⑤ Logout/Version menu

Click ▼ to view the menu described below.

Logout: Used to log out from this software and return to the login screen.

Version: Used to view the version information of this software.

- Camera list upper part

Buttons are arranged in the upper part of the camera list display for switching the list display.

1 2 3 4 All 16 [x - x 5 2 3 4 5 >] < Camera Controller

①List showing filtered display of the list of cameras

From the drop-down list, filter the cameras to be displayed.

Filtering can be performed based on the following conditions:

All: All cameras are displayed

Lost: Only cameras for which the tracking target has been lost out of sight are displayed

Tracking: Only cameras for which the tracking operation is being performed are displayed

Stop: Only cameras that are in the state prior to the start of tracking are displayed

[Category name]: Only cameras belonging to the category registered in Category on the Settings screen are displayed

②List for selecting the display count from the list of cameras

The number of cameras to be displayed per page is changed from a drop-down list.

③ Page selection button

Used to select a page in the camera list display.

④Show/hide camera controller selection button

Used to show or hide the camera controller.

- Camera list display

Display contents of each camera in the camera list display. The background of the selected camera appears in red color.

1 Tracking 2 Camera 1 3 4 5 JHON 6 Main 7 Disconnect

① Status display

Displays the status of the camera.

Lost: This is the state in which the tracking target has been lost

Tracking: This is the state during tracking

Stop: This is the state prior to the start of tracking

Disconnect: This is the state in which a connection has not been established with the camera

② Camera name display

Displays the name of the registered camera.

③ Thumbnail image display

Displays the thumbnails of camera images.

If the camera is not found (the power is OFF, or the camera is not connected to the network, etc.), “OFF” is displayed.

④ Tracking target face image display

Displays the face image of the person selected as the tracking target.

⑤ Tracking target name display

Displays the name of the person selected as the tracking target.

⑥ Main screen display button

Used to switch to the Main screen.

⑦ Connect/Disconnect button

Used to connect or disconnect the remote camera.

- Camera controller

The camera controller provides various operating functions of the camera. The camera selected in the camera list display is the operating target.

For details on the operating method, refer to the "Operation of the Camera Controller" section of this manual.

PTZ Pan/Tilt Fast Slow Zoom T W Focus Far Near Auto 3 Preset 1 2 3 4 5 6 7 8 9 SET 4 Image Adjust IRIS GAIN WB SHUTTER ND + Auto AWB A OFF Through - - Auto AWB ABB USER 5 1 2 3 Web Camera Ctrl Go 6

① PTZ control part

You can perform Pan/Tilt/Zoom control for the remote camera.

② Focus control part

You can perform Focus control for the remote camera.

③ Preset control part

You can perform Preset control for the remote camera.

④ Image Adjust part

You can adjust the images shot by the remote camera.

⑤ USER button

This button does not function in the current version.

⑥ Web Camera Ctrl button

Click the Go button to open the Web management screen of the remote camera on the Web browser.

Main Screen

If you click the Main tab at the top of the screen, the Main screen appears.

The Main screen is configured by the following three areas:

  • Camera list display
  • Tracking operation area
  • Camera controller

Auto Tracking Server Software All Tracking Camera 1 JHON Disconnect Camera 2 Camera list display Tracking Camera 3 ROBERT Disconnect Stop Camera 4 WALTER Disconnect VIEW MAIN Camera 1 Tracking operation area Tracking Face Recognition Start/Stop ON/OFF JHON Select Face Target Position Angle Pan/TR Limitation SET Upper Body Full Body Full OFF - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Main screen

- Camera list display

In the camera list display area of the Main screen, each camera is arranged vertically.

<1 All 2 | < < 1 2 3 4 5 > > | 4 Tracking Camera 1 stay Ero 'Kend eines Warfp E[R] = r_c = r_f + (3_i^4) × (E[R] - r_f) JHON Disconnect

①Display ON / OFF switching button

Switches the camera list display ON / OFF.

②List showing filtered display of the list of cameras

From the drop-down list, filter the cameras to be displayed.

The function is same as that on the View screen.

③ Page selection button

Used to select a page in the camera list display.

④ Camera list display

Displays the status of each camera.

This area is same as that on the View screen except that the Main button does not exist.

- Tracking operation area

The buttons for performing the tracking operation are arranged in this area. The camera selected in the camera list display is the operating target.

Camera 1 Tracking Face Recognition 5 Start/Stop Setting 7 ON/OFF 8 JHON 9 Select Face 10 Auto Face Search 11 Add Face Target Position Angle 12 SET 13 Upper Body Full Body Full OFF Pan/Tilt Limitation 14

① Camera name

Displays the registered name of the camera for which operations are to be performed.

The background becomes red in color if the tracking target is lost out of sight.

② Camera image

The image acquired from the remote camera is displayed.

③ Tracking target display

This is a rectangular display that shows the tracking target.

- When the tracking method is Template matching

The blue-framed rectangle shows the position of the tracking target.

Also, if the face of the tracking target is detected, a yellow-framed rectangle is displayed.

No frame is displayed if a tracking target does not exist, or if the tracking target is lost sight of.

- When the tracking method is Deep Learning (CPU) or Deep Learning (GPU)

The blue-framed rectangle shows the position of the tracking target and the red-framed rectangle shows the detected human.

Also, if the face of the tracking target is detected, a yellow-framed rectangle is displayed.

No frame is displayed if a tracking target does not exist, or if the tracking target is lost sight of.

④ Mask area setting slider

Used to set the mask area (the area that is not used during detection within the camera images) when detecting the tracking target.

The area can be set at both the top and bottom of the screen.

⑤ Tracking Start/Stop button

This button is used to set whether to perform the Pan/Tilt operation of the remote camera if a tracking target exists.

ON (red color):

The Pan/Tilt operation is performed in accordance with the movement of the tracking target.

OFF (gray color):

The Pan/Tilt operation is not performed.

⑥ Tracking setting button

Click to view the Tracking Setting window.

⑦Face Recognition ON/OFF button

This button is used to set the operation of the face recognition function.

ON (red color):

The face recognition function is used.

A process is performed for comparing the face of the person that is set as the recognition source and the face detected in the camera images, and only the face determined to be of the same person is set as the target of the tracking process.

If the recognition source has not been set, all faces detected in the camera images are set as the target of the tracking process regardless of whose face it is.

OFF (gray color):

The face recognition function is not used.

⑧ Face setting display

The face photograph and name of the person set as the recognition source of face recognition is displayed.

⑨ Select Face button

Used to display the Select Face window.

In the Select Face window, you can select the face data to be used as the recognition source of face recognition.

⑩Auto Face Search checkbox

If this checkbox is selected, the face of the person registered for face recognition, and the face detected in the camera image are compared, and if either person is detected, tracking is performed for that person.

⑪Add Face button

This button displays the Add Face screen for registering the face data of the person for face recognition.

⑫Target Position Set button

Used to set the operation when a camera image is left-clicked.

ON (red color):

When you left-click the camera image, the display position of the tracking target changes to the clicked position.

OFF (gray color):

When you left-click the camera image, the object that exists at that position is set as the tracking target.

⑬ Angle specification button

This button specifies the angle of view during tracking.

Upper Body :

Sets the angle of view so that the part of the body of the tracking target above the chest is displayed.

Full Body :

Sets the angle of view so that almost the entire body of the tracking target is displayed.

Full :

Sets the angle of view so that the tracking target and its surroundings are displayed.

OFF :

Retains the current angle of view.

⑭Pan/Tilt Limitation ON/OFF button

This button is used to set the Pan/Tilt limitation of the camera. The limitation in each direction can be set to ON/OFF with the use of the four Top/Bottom/Left/Right buttons.

- Camera controller

The function is same as that on the View screen.

- Tracking Setting window

This window appears when you click the Setting button in the Tracking field of the Main screen.

You can make settings regarding the tracking operation in this window.

Tracking Setting 1 Auto Tracking Start : 2 Stop Tracking with manual preset recall : 3 Trigger of lost state judgement : Body 4 Duration before judgement of lost state : 5 Sec 5 Home position : Preset 1 6 Duration before execution of home position preset : 3 Sec 7 Sensitivity Level(1-10) : 5 8 Tracking Disable Area (X, Y, Width, Height) : 0 0 0 0 OK Cancel 9 10

①Auto Tracking Start

Set the operation to be performed when the tracking target is detected.

If the check mark is ON, the tracking operation of the camera starts automatically when the tracking target is detected.

②Stop Tracking with manual preset recall

Sets the operation to be performed when a preset is called.

If the check mark is ON, tracking operation is stopped when a preset is called.

③Trigger of lost state judgement

Sets the subject for lost state judgment.

Body:

Triggers lost state judgment when no body is detected.

Face:

Also triggers lost state judgment when no face is detected for a specified time even after a body has been detected.

④Duration before judgement of lost state

Sets the time (in seconds) before the judgment of lost state is made after a face is no longer detected when Face is selected in trigger of lost state judgement.

You can set a value in the range of 1 to 30.

⑤ Home position

Set the operation to be performed when the tracking target is lost.

NONE:

The camera position remains the same after the tracking target is lost.

Preset 1 to Preset 9:

When the stipulated time elapses after the tracking target is lost, the camera position is returned to the specified preset position.

⑥Duration before execution of home position preset

When the Home position is set to Preset 1 to Preset 9, set the time (secs.) from when the tracking target is lost until when the camera position is returned to the preset position.

You can set a value in the range of 1 to 30.

⑦Sensitivity Level

Set the sensitivity of the tracking operation of the camera with respect to the movement of the tracking target as a value in the range of 1 to 10.

The higher the value, the higher the sensitivity.

⑧Tracking Disable Area

Set the area in which the tracking operation of the camera is not to be performed.

You can set the width up to 640 and the height up to 360.

The camera does not perform the tracking operation when the tracking target moves inside the area set here.

This area can also be set by right-clicking on the camera image and dragging.

When canceling the setting, right-click outside the range of the camera image.

⑨ OK button

Used to enable the setting and close the window.

⑩ Cancel button

Used to cancel the setting and close the window.

- Select Face window

This window appears when you click the Select Face button on the Main screen.

On this window, you can set the face of the person that is the tracking target.

Face authentication 1 Leonard Mary Kim Luke Freddy Andrew John Darla Steve Brett 2 3 4 << < 2 3 > >> OK Cancel

① Face data list display

This is a list of the registered face data.

You can select or cancel the face data by clicking. The background of the selected face data appears in red color.

② Page selection button

You can select a page in the face data list display.

③ OK button

Used to enable the setting and close the window.

④ Cancel button

Used to cancel the setting and close the window.

Settings – Control Screen

This screen is used to make the settings of the servers configuring this software.

Click the Settings button at the top left of the screen, and then click the Control tab at the center of the screen to move to this screen.

For details on the server settings, refer to "Default Settings - Server Installation Settings" in this manual.

Auto Tracking Server Software VIEW MAIN Logged in as SP200-1mm System Setting 1 Husbname: 192.168.0.200 PortNo: 8181 Master Control 192.168.0.201 8181 Slave Control 2 Description: 5 6 7 8 Master: 4 9

① Hostname

Displays the IP address of the registered server.

② Port No.

Displays the port number that each server uses for communication.

③ Description

Displays the description of each server.

④ Master

A ● mark is displayed for the server operating as the Master server.

⑤ Search box

Used when searching the server by the IP address.

If you enter a numeric value, only the servers that include the numeric value in the IP address are displayed in the list.

To return the display to the original display, clear the entered contents.

⑥ Add button

Used to move to the Register Server screen.

⑦ Edit button

Used to move to the Edit Server screen.

⑧ Delete button

Used to delete the selected server.

You can delete only the Slave servers.

⑨ Page selection button

Used to select the page to be displayed.

- Register/Edit Server screen

The display moves to this screen when you click the Add button/Edit button.

You can register a new server and edit already-registered server information.

System Setting Control Camera User Category Face Recognition Add Control 1 Hostname: 192.168.0.201 2 PortNo: 8181 3 Description:Slave Server 4 OK Cancel

① Hostname

Enter the IP address of the server.

② Port No.

Enter the port number that the server uses for communication.

③ Description

Enter any optional server description.

④ OK button

Used to apply the settings and return to the Control screen.

⑤ Cancel button

Used to cancel the settings and return to the Control screen.

Settings - Camera Screen

This screen is used to make the settings of the remote camera used in this software.

Click the Settings button at the top left of the screen, and then click the Camera tab at the center of the screen to move to this screen.

For details on the remote camera settings, refer to “Default Settings - Remote Camera Installation Settings” in this manual.

Auto Tracking Server Software VIEW MAIN System Setting Control Camera User Category Face Receiver Calendar Counting 6 7 8 9 ID: 2 Name: IP Address: Port No: Now Connecting: 1 Camera 1 192.168.0.10 80 2 Camera 2 192.168.0.11 80 3 Camera 3 192.168.0.12 80 4 Camera 4 192.168.0.13 80 5 Camera 5 192.168.0.14 80 6 Camera 6 192.168.0.15 80 7 Camera 7 192.168.0.16 80 8 Camera 8 192.168.0.17 80 9 Camera 9 192.168.0.18 80 10 Camera 10 192.168.0.19 80 11 Camera 11 192.168.0.20 80 12 Camera 12 192.168.0.21 80 13 Camera 13 192.168.0.22 80 14 Camera 14 192.168.0.23 80 15 Camera 15 192.168.0.24 80 16 Camera 16 192.168.0.25 80 10

① ID

Displays the registration number of the registered camera.

② Name

Displays the name of the registered camera.

③ IP Address

Displays the IP address of each camera.

④ Port No.

Displays the port number that each camera uses for communication.

⑤ Now Connecting

A • mark is displayed for the camera to which a connection is being established.

⑥ Search box

Used when searching the camera by name.

If you enter a string, only the cameras that include the string in the name are displayed in the list.

To return the display to the original display, clear the entered contents.

⑦ Add button

Used to move to the Register Camera screen.

⑧ Edit button

Used to move to the Edit Camera screen.

⑨ Delete button

Used to delete the selected camera.

<Note> 

You cannot delete a camera to which a connection is being established.

You cannot delete a camera registered in categories.

⑩ Page selection button

Used to select the page to be displayed.

- Register/Edit Camera screen

The display moves to this screen when you click the Add button/Edit button.

You can register a new camera and edit already-registered camera information.

System Setting Control Camera User Category Face Recognition Tracking Add Camera Auto Search 13 1 Name: AW-UE 70 2 IP Address: 192.168.0.20 3 Port No: 80 4 Login: adults 5 Password:**** 6 Height: 250 cm 7 Distance: 1000 cm cm Test 8 Max Zoom: 100 % 9 Angle Zoom(Upper Body): 0 % Auto 10 Angle Zoom(Full Body): 0 % Auto 11 Angle Zoom(Full): 0 % Auto 12 Image Capture Type: JPEG H.264 13 Operation after connection: 14 Facing the front Preset 1 15 OK Cancel

① Name

Enter any optional remote camera name.

② IP Address

Enter the IP address of the remote camera.

③ Port No.

Enter the port number that the remote camera uses for communication.

④ Login

Enter the user name of the remote camera.

⑤ Password

Enter the password of the remote camera.

⑥ Height

Set the height at which the remote camera is installed in cm/feet.

⑦ Distance

Set the distance from the position where the remote camera is installed up to the position where the tracking target mainly exists in cm/feet.

⑧ Max Zoom

Set the maximum Zoom magnification of the remote camera.

You can set a value in the range of 0 to 100.

⑨ Angle Zoom (Upper Body)

Set the Zoom magnification when Upper Body is selected in the Angle specification of the Main screen.

You can set a value in the range of 0 to 100.

The set Zoom magnification is enabled only when Auto check is OFF. When the Auto check is ON, the Zoom magnification is decided automatically from the value of Height and Distance.

⑩ Angle Zoom (Full Body)

Set the Zoom magnification when Full Body is selected in the Angle specification of the Main screen.

You can set a value in the range of 0 to 100.

The set Zoom magnification is enabled only when Auto check is OFF. When the Auto check is ON, the Zoom magnification is decided automatically from the value of Height and Distance.

⑪ Angle Zoom (Full)

Set the Zoom magnification when Full is selected in the Angle specification of the Main screen.

You can set a value in the range of 0 to 100.

The set Zoom magnification is enabled only when Auto check is OFF. When the Auto check is ON, the Zoom magnification is decided automatically from the value of Height and Distance.

⑫ Image Capture Type

You can select the method of capturing images from the camera.

JPEG: Images are captured as JPEG images.

H.264: Images are captured as an H.264 stream.

It is necessary to make the settings for the camera in accordance with the respective image acquisition method.

For details, refer to "Default Settings - Remote Camera Settings" in this manual.

⑬Auto Search button

When you click this button, the list of cameras present on the network is displayed.

When you select any one camera from the list and then close the window by clicking the OK button, values are entered automatically for some items.

⑭Operation after connection

Set the operation after connecting to the camera from the following.

Facing the front: After connection, the camera turns to the front.

Move to preset position: After connection, the camera moves to the selected preset position.

Do nothing: The camera keeps its position before connection.

⑮ OK button

Used to apply the settings and return to the Camera screen.

⑯ Cancel button

Used to cancel the settings and return to the Camera screen.

Settings – User Screen

This screen is used to make the account settings for the user using this software.

Click the Settings button at the top left of the screen, and then click the User tab at the center of the screen to move to this screen.

For details on the account settings, refer to "Default Settings - User Account Settings" in this manual.

Auto Tracking Server Softwamp VIEW MAIN Logged in as SF200Admin System Setting Control Camera User Categories 2 3 4 5 1 UI/MI/Admin Rule - Administrator UI/MI/SuperSim Rule - Super User UI/MI User Rule - User 6 4.6 1 2 3 4 5 > 20

① Account List Display

Displays the list of registered accounts.

The account name is displayed in the upper row of each account, and the authority is displayed in the lower row.

Used when searching the account by account name.

If you enter a string, only the accounts that include the string in the account name are displayed in the list.

To return the display to the original display, clear the entered contents.

③ Add button

Used to move to the Register Account screen.

④ Edit button

Used to move to the Edit Account screen.

⑤ Delete button

Used to delete the selected account.

⑥ Page selection button

Used to select the page to be displayed.

- Register/Edit Account screen

The display moves to this screen when you click the Add button/Edit button.

You can register a new account and edit already-registered account information.

System Setting Control Camera User Category Face Recognition Add User 1 Login: SF200User 2 Password: ............ 3 Password(Retype): ............ 4 Role: User 5 6 OK Cancel

① Login

Enter the account name.

② Password

Enter the password.

③ Password (Retype)

Re-enter the password for confirmation.

④ Role

Set the account authority.

⑤ OK button

Used to apply the settings and return to the User screen.

⑥ Cancel button

Used to cancel the settings and return to the User screen.

Settings – Category Screen

This screen is used to make the settings of the category (group) of the registered remote camera.

Click the Settings button at the top left of the screen, and then click the Category tab at the center of the screen to move to this screen.

For details on the category settings, refer to “Default Settings - Camera Category Settings” in this manual.

Auto Tracking Server Software VIEW MAIN Logged in as SP200Admin System Setting Control Camera Size Category Session 2 3 4 5 ADD 1 Classroom 1 Classroom 2 Classroom 3 Classroom 4 Classroom 5 6

① Category list display

Displays the list of registered categories.

② Search box

Used when searching the category.

If you enter a string, only the categories that include the string in the name are displayed in the list.

To return the display to the original display, clear the entered contents.

③ Add button

Used to move to the Register Category screen.

④ Edit button

Used to move to the Edit Category screen.

⑤ Delete button

Used to delete the selected category.

⑥Page selection button

Used to select the page to be displayed.

- Register/Edit Category screen

The display moves to this screen when you click the Add button/Edit button.

You can register a new category and edit an already-registered category.

System Setting Control Camera User Category Face Recognition Add Category 1 Name: classroom 1 Selectable Cameras: 2 3 Name: IP Address: Camera 3 192.168.0.12 Camera 4 192.168.0.13 Camera 5 192.168.0.14 Camera 6 192.168.0.15 Camera 7 192.168.0.16 Camera 8 192.168.0.17 Camera 9 192.168.0.18 Camera 10 192.168.0.19 Camera 11 192.168.0.20 Camera 12 192.168.0.21 Camera 13 192.168.0.22 Camera 14 192.168.0.23 Camera 15 192.168.0.24 Camera 16 192.168.0.25 GroupCameras: 4 Name: IP Address: Camera 1 192.168.0.10 Camera 2 192.168.0.11 Add Delete 7 OK Cancel

① Name

Enter the category name.

② Search box

If you enter a string, only the cameras that include the string in the name are displayed in the camera list indicated in (3).

③List of cameras that do not belong to the category

A list of cameras that do not belong to the currently registered or edited category is displayed.

④List of cameras that belong to the category

A list of cameras that belong to the currently registered or edited category is displayed.

⑤ Add button

If you select a camera in the list of cameras indicated in (3) and then click this button, the selected camera is added to the category.

⑥ Delete button

If you select a camera in the list of cameras indicated in (4) and then click this button, the selected camera is deleted from the category.

⑦ OK button

Used to apply the settings and return to the Category screen.

⑧ Cancel button

Used to cancel the settings and return to the Category screen.

Settings – Face Recognition Screen

This screen is used to make face data settings of the person, who is the tracking target.

Click the Settings button at the top left of the screen, and then click the Face Recognition tab at the center of the screen to move to this screen.

For details on the face data settings, refer to "Data Settings for Face Recognition" in this manual.

Auto Tracking Server Software VIEW MAIN System Setting Control Camera User人類 Category Software Calendar Session Add Live Show 1 Brad 2 Leonard 3 Mary 4 Kon 5 Luke 6 Freddy 7 Rachael 8 Andrew 9 Darla 10.Stove 11 Brett 6 << 1 2 3 4 5 > >>

① Face data list display

Displays the list of registered face data.

② Search box

Used when searching the face data.

If you enter a string, only the face data that includes the string in the name is displayed in the list.

To return the display to the original display, clear the entered contents.

③ Add button

Used to move to the Register Face Data screen.

④ Edit button

Used to move to the Edit Face Data screen.

⑤ Delete button

Used to delete the selected face data.

You cannot delete the face data that is set as the tracking target in any remote camera.

⑥ Page selection button

Used to select the page to be displayed.

- Register/Edit Face Data screen

The display moves to this screen when you click the Add button/Edit button.

You can register new face data and edit already-registered face data.

System Setting Control Camera User Category Face Recognition Edit Face Recognition Input Image: from file: 1 Browser 2 from camera: AW-RE 40_01 3 Girl 4 5 Image: 6 7 Leonard 8 Name Add 9 Cancel

① Browse button

If you click this button, a Select Image dialog box appears, and you can import an existing JPEG image.

② Camera selection box

Select the target camera for capturing the images. Only the connected cameras are displayed in the list.

③ Get button

If you click this button, the images from the camera selected in the camera selection box are captured and imported.

④ Image display area

The images imported through the operation of the Browse button or Get button are displayed.

⑤Face detection display frame

When a face is detected in an imported image, a frame appears around the face.

If you click the frame, the face is selected as the target.

⑥ Face image display

The image of the selected face appears.

⑦ Name input field

Enter the registered name of the selected face.

⑧ Add button

If you click this button, the image and name of the selected face are registered.

⑨ Close button

Click this button to return to the Face Recognition screen.

Settings - Tracking Screen

This screen is used to make the settings of the tracking method.

Click the Settings button at the top left of the screen, and then click the Tracking tab to move to this screen.

For details, refer to "Default Settings - Tracking Method Settings" in this manual.

Auto Tracking Server Software VIEW MAIN The trial period is 20 days left. Logged in as GoogleUser System Setting Control Camera User Category Fax Recognition Calendar Tasking Tracking method Template matching Deep Learning (GPU) - 64bit only Deep Learning (GPU) - 64bit only, NVIDIA GPU required SIT

Default Settings

Remote Camera Settings

Before using this software, make the settings in the remote camera.

The methods of capturing images from the remote camera include capturing images as JPEG images, and capturing images as an H.264 stream.

When capturing images as JPEG images, set “Image capture type” to JPEG at the time of registering the camera from Settings - Camera screen of this software.

When capturing images as an H.264 stream, set "Image capture type" to H.264 at the time of registering the camera from Settings - Camera screen of this software.

■ AW-UE150 settings

The tracking performance is higher when images are captured as JPEG images.

  • When images are captured as JPEG images
    On the Web screen of the camera, make the following settings from Setup -> Video over IP -> JPEG(1):
    Image capture size: 1280 x 720 or higher
    Refresh interval: During NTSC: 15 fps or higher, During PAL: 12.5 fps or higher

- When images are captured as an H.264 stream

On the Web screen of the camera, make the following settings from Setup -> Video over IP -> H.264(1):

H.264 transmission: On

Image capture size: 1280 x 720 or higher

Transmission priority: Frame rate

Frame rate: During NTSC: 15 fps or higher, During PAL: 12.5 fps or higher

■ AW-HE130 settings

The tracking performance is higher when images are captured as an H.264 stream.

- When images are captured as JPEG images

On the Web screen of the camera, make the following settings for each item:

Initial display settings for "Live" page

Stream: JPEG(1)

Refresh interval (JPEG): During NTSC: 15 fps or higher, During PAL: 12.5 fps or higher JPEG(1)

JPEG transmission: On

Image capture size: 1280 x 720

H.264(1)

H.264 transmission: Off

H.264(2)

H.264 transmission: Off

H.264(3)

H.264 transmission: Off

H.264(4)

H.264 transmission: Off

- When images are captured as an H.264 stream

On the Web screen of the camera, make the following settings from Setup -> Image/Audio -> H.264(1):

H.264 transmission: On

Image capture size: 1280 x 720 or higher

Transmission priority: Frame rate

■ AW-UE70 / AW-HE42 settings

The tracking performance is higher when images are captured as JPEG images.

- When images are captured as JPEG images

On the Web screen of the camera, make the following settings from Setup -> Image/Audio -> JPEG(1):

Image capture size: When the Priority Mode is IP: 1280 x 720

When the Priority Mode is other than IP: 640 x 360

Refresh interval: During NTSC: 15 fps or higher, During PAL: 12.5 fps or higher

Image quality: Normal

- When images are captured as an H.264 stream

On the Web screen of the camera, make the following settings from Setup -> Image/Audio -> H.264(1):

H.264 transmission: On

Image capture size: 1280 x 720 or higher

Transmission priority: Frame rate

Frame rate: During NTSC: 15 fps or higher, During PAL: 12.5 fps or higher

■ AW-HE40 settings

The tracking performance is higher when images are captured as JPEG images.

- When images are captured as JPEG images

On the Web screen of the camera, make the following settings from Setup -> Image/Audio -> JPEG(1):

Image capture size: When the Priority Mode is IP: 1280 x 720

When the Priority Mode is other than IP: 640 x 360

Refresh interval: During NTSC: 15 fps or higher, During PAL: 12.5 fps or higher

Image quality: Normal

- When images are captured as an H.264 stream

On the Web screen of the camera, make the following settings from Setup -> Image/Audio -> H.264(1):

H.264 transmission: On

Image capture size: 1280 x 720 or higher

Transmission priority: Frame rate

Frame rate: During NTSC: 15 fps or higher, During PAL: 12.5 fps or higher

■ AW-UE4 settings

The tracking performance is higher when images are captured as JPEG images.

- When images are captured as JPEG images

On the Web screen of the camera, set Setup->Basic->Priority mode to IP.

Make the following settings from Setup -> Image/Audio -> JPEG

Image capture size: 1280 x 720

Frame rate: During NTSC: 10, During PAL: 10

- When images are captured as an H.264 stream

On the Web screen of the camera, set Setup->Basic->Priority mode to IP.

Make the following settings from Setup -> Image/Audio -> H.264/H.265

Stream transmission: On

Codec: H.264

Image capture size: 1280 x 720

Frame rate: During NTSC: 15, During PAL: 10

Server Installation Settings

When configuring this software by multiple servers, make the server installation settings during the initial startup.

This setting is not required when configuring the software by a single server.

  1. Log in to this software.
  2. The View screen appears. Click the Settings button at the top left of the screen.

Auto Tracking Server Software Camera 1 JASON Tracking Camera 2 Camera 3 Stop Camera 4 MOV TUR Tracking Camera 5 JASON Tracking Camera 6 Camera 7 Stop Camera 8 CLTR Camera 9 JASON Tracking Camera 10 Camera 11 Last Camera 12 JASON Tracking Camera 13 Camera 14 Camera 15 Camera 16 OFF OFF OFF OFF

  1. Click the Control tab in the center of the Settings screen.

Auto Tracking Server Software Symbol Setting FormName PortFy Description Monitor PSC 148.0.200 #047 Monitor Control PSC 148.0.200 #050 Show Control

  1. Register the Slave servers.

Perform the registration task described below as many times as the number of Slave servers.

(1) Click the Add button to move to the Register Server screen.

Auto Tracking Server Software SYSTEM SETTING Home File Edit View Tools Settings Hashcode Portfile Description Master Control MSI: 108.0.206 8747 Master Control MSI: 108.0.205 8741 Slow Control

(2) Make an entry in the following items.

Hostname: IP address of the Slave server

PortNo: Port number used by the Slave server (the default value is 8190)

Description: Description of the Slave server

System Setting Control Camera User Category Face Recognition Add Control Hostname: 192.168.0.201 PortNo: 8161 Description: Slave Server OK Cancel

(3) Click the OK button to complete registration.

Remote Camera Installation Settings

During initial startup of this software, make the installation settings of the remote camera.

  1. Log in to this software.

  2. The View screen appears. Click the Settings button at the top left of the screen.

Auto Tracking Server Software Camera 1 Camera 2 Tracking Camera 3 Stage Camera 4 Tracking Camera 5 Tracking Camera 6 Camera 7 Camera 8 Camera 9 Camera 10 Tracking Camera 11 Last Camera 12 Camera 13 Camera 14 Camera 15 Camera 16 OFF OFF OFF OFF

  1. Click the Camera tab in the center of the Settings screen.

Auto Tracking Sensor Software System Setting Name: Camera IP Address: Phone No: New Connecting Camera 1 Camera 2 Camera 3 Camera 4 Camera 5 Camera 6 Camera 7 Camera 8 Camera 9 Camera 10 Camera 11 Camera 12 Camera 13 Camera 14 Camera 15 Camera 16 Camera 17 Camera 18 Camera 19 Camera 20 Camera 21 Camera 22 Camera 23 Camera 24 Camera 25 File No: New Connecting

  1. Make the settings of the camera.

Perform the registration task described below as many times as the number of cameras.

(1) Click the Add button to move to the Register Camera screen.

Auto Tracking Sensor Software Version Options Settings Name: Camera 1 Camera 2 Camera 3 Camera 4 Camera 5 Camera 6 Camera 7 Camera 8 Camera 9 Camera 10 Camera 11 Camera 12 Camera 13 Camera 14 Camera 15 Camera 16 IP Address: 102.108.0.10 102.108.0.11 102.108.0.12 102.108.0.13 102.108.0.14 102.108.0.15 102.108.0.16 102.108.0.17 102.108.0.18 102.108.0.19 102.108.0.20 102.108.0.21 102.108.0.22 102.108.0.23 102.108.0.24 102.108.0.25 Add Add New Connecting: BND

(2) Make an entry in the following items.

You can make an entry in the items either manually, or automatically by searching the camera.

Name: Name of the camera

IP Address: IP address of the camera

PortNo: Port number used by the camera (the default value is 80)

Login: Camera account

Password: Camera password

Height: Camera installation height

Distance: Camera installation distance

System Setting Control Cafers Laser Category Face Recognition Add Camera Auto Search Name: AW UF70 IP Address: 152.168 0.20 Port No: 60 Login: adults Password:**** Height: 250 cm Distance: 1000 cm Max Zoom: 100 % Angle Zoom(Upper Body): 0 % Auto Angle Zoom(Full Body): 0 % Auto Angle Zoom(Full): 0 % Auto OK Cancel

- When an entry is made manually

Move to the box of each item and enter the value.

- When an entry is made automatically

When you click the Auto Search button, the list of cameras present on the network is displayed.

When you select any one camera from the list and then close the window by clicking the OK button, values are entered automatically for some items.

No: Client Misc: IP Address: Port No: Camera Name: Camera Models: 1 20-C5-EB-07-02-43 10.194.151.12 BD AW-HE70 CAM-HE70 2 08-00-23-6F-02-21 192.168.0.99 BD SFNB31C 3 00-80-85-2F-24-80 10.194.151.33 BD CAM-HE.A10

(3) Click the OK button to complete registration.

User Account Settings

During initial startup of this software, make the settings of the user account using this software.

  1. Log in to this software.

  2. The View screen appears. Click the Settings button at the top left of the screen.

Auto Tracking Server Software Camera 1 Camera 2 Tracking Camera 3 Stage Camera 4 Tracking Camera 5 Tracking Camera 6 Camera 7 Camera 8 Camera 9 Camera 10 Tracking Camera 11 Last Camera 12 Camera 13 Camera 14 Camera 15 Camera 16 OFF OFF OFF OFF

  1. Click the User tab in the center of the Settings screen.

Auto Tracking Server Software U248 U347 Logiert in as if 2023-19 Security Server Status Name: Security Type Description OK Cancel Help Access My Documents My Documents My Tools Help My Tools Help My Tools Help

  1. Make the settings of the user account.

Perform the registration task described below only as many times as the number of required users.

(1) Click the Add button to move to the Register User screen.

Audio Tracking Server Software System Settings Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Aid: 0.0000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000

(2) Make an entry in the following items.

Login: User account name

Password: Password

Password (Retype): Password (for confirmation)

Role: Account authority You can select the role from the following three types:

Administrator: All functions can be used

Super User: Server settings (Control screen) cannot be used

User: The following features are not available

Server settings (Control screen)

Account management (User screen)

Camera settings (Camera screen)

Category settings (Category screen)

When User is selected in Role, you can set the camera categories that can be accessed.

System Setting Control Camera User Category Face Recognition Add User Login: SF200User Password: .......... Password(Retype): .......... Role: User OK Cancel

(3) Click the OK button to complete registration.

Camera Category Settings

If necessary, make the settings for the camera category (camera group).

  1. Log in to this software.

  2. The View screen appears. Click the Settings button at the top left of the screen.

Auto Tracking Server Software Camera 1 Camera 2 Tracking Camera 3 Stage Camera 4 Tracking Camera 5 Tracking Camera 6 Camera 7 Camera 8 Camera 9 Camera 10 Tracking Camera 11 Last Camera 12 Camera 13 Camera 14 Camera 15 Camera 16 OFF OFF OFF OFF

  1. Click the Category tab in the center of the Settings screen.

Auto Tracking Server Software SYSTEM Settings System Settings System Settings System Settings System Settings

  1. Make the settings for the category.

Perform the registration task described below only as many times as the number of required categories.

(1) Click the Add button to move to the Register Category screen.

Auto Trucking Server Software SYSTEM SETTING Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Edit

(2) Enter the name of the category to be registered in Name.
(3) If you select a camera to be registered in the category from the camera list on the left, and then click the Add button, the camera is added to the category.

System Setting Control Camera User Category Tace Recognition Add Category Name: Clexvson 1 Selectable Cameras: GroupCameras: Name: IP Address: Camera 3 192.168.0.12 Camera 4 192.168.0.13 Camera 5 192.168.0.14 Camera 6 192.168.0.15 Camera 7 192.168.0.16 Camera 8 192.168.0.17 Camera 9 192.168.0.18 Camera 10 192.168.0.19 Camera 11 192.168.0.20 Camera 12 192.168.0.21 Camera 13 192.168.0.22 Camera 14 192.168.0.23 Camera 15 192.168.0.24 Camera 16 192.168.0.25 Add Delete Name: IP Address: Camera 1 192.168.0.10 Camera 2 192.168.0.11 OK Cancel

(4) Click the OK button to complete registration.

Tracking Method Settings

You can set the tracking method to be used in this software.

  1. Click the Settings button at the top left of the screen.

Auto Tracking Server Software Camera 1 JASON KORET Camera 2 ALEX KORET Tracking Camera 3 SCIENT Camera 4 WALTA SAR Camera 5 LEER SAR Camera 6 SCIENT Camera 7 VICTOR SAR Camera 8 GLYN SAR Camera 9 SCIENT Camera 10 SCIENT Camera 11 SCIENT Camera 12 SCIENT Camera 13 Camera 14 Camera 15 Camera 16 OFF OFF OFF OFF

  1. Click the Tracking tab on the Settings screen.

Auto Tracking Server Software VIEW MAIN The trial period is 20 days left. Logged in as GoOGluChen System Setting Control Camera Use Categories Face Recognition Calendar Tracking Tracking method Template matching Deep Learning (CPU) - 6MBit only Deep Learning (GPU) - 6MBit only, NVs5a GPU required GET

  1. Under "Tracking method", select the tracking method to use.

Template matching: This is the regular detection method with a low CPU load.

Deep Learning (CPU): This is a method of human body detection by deep learning using the CPU.

Although the CPU load is higher as compared to Template matching, more accurate detection can be performed.

Deep Learning (GPU): This is a method of human body detection by deep learning using the GPU.

Since the GPU is used, faster detection can be performed at a CPU load lesser than when the CPU is used.

- To use the Deep Learning (GPU) method, it is necessary for the PC environment to satisfy the following conditions:

- A NVIDIA GPU board must be provided in the PC.

The supported GPU boards are as follows:

Pascal architecture

NVIDIA GeForce GTX 1080 or later

NVIDIA Quadro P4000 or later

Turing architecture

NVIDIA GeForce RTX 2080/2080Ti

NVIDIA Quadro RTX 4000 or later

- Both the OS and this software must be 64-bit versions.

When using a GPU with Turing architecture, please use Windows 10 or Windows Server 2016 for the operating system.

- NVIDIA CUDA Toolkit must be installed in the PC.

When using a GPU with Pascal architecture, please install CUDA Toolkit 8.0 referring to the following procedure.

https://eww.pass.panasonic.co.jp/pro-av/support/content/download/DEF/soft/man/CUDA_Toolkit_8.0_InstallationProcedures_jpn.pdf

When using a GPU with Turing architecture, please install CUDA Toolkit 10.1 referring to the following procedure.

https://eww.pass.panasonic.co.jp/pro-av/support/content/download/DEF/soft/man/CUDA_Toolkit_10.1_InstallationProcedures_jpn.pdf

Data Settings for Face Recognition

Registering the Face Data

Since this software enables tracking by detecting the face of a specified person with the help of the face recognition function, a stable tracking operation is implemented.

You can register beforehand the face data that is used as a recognition source of the person to be tracked. There are two methods of registering the face data, namely a method of using an existing JPEG image, and a method of using an image captured from camera images.

Register the face data according to the procedure described below.

  1. Log in to this software.

  2. The View screen appears. Click the Settings button at the top left of the screen.

Auto Tracking Server Software Camera 1 Camera 2 Tracking Camera 3 Stop Camera 4 Tracking Camera 5 Tracking Camera 6 Camera 7 Camera 8 Camera 9 Camera 10 Tracking Camera 11 Last Camera 12 Camera 13 Camera 14 Camera 15 Camera 16 OFF OFF OFF OFF

  1. To capture from the camera images, click the Connect button of the camera to use to set the camera to the connected state.

  2. Click the Face Recognition tab in the center of the Settings screen.

Audio Tracking Sensor Software System Settings User Profile Language Name Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Language Currency

  1. Click the Add button at the top right of the screen.

Anopy Tracking Server Software SYSTEM SETTING Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add Amp Mary Tom Luke Spadily Andrine Aris Dunis Browk Bout

  1. The Register Face Data screen appears.

System Setting Control Camera User Category Face Recognition Edit Face Recognition Input Image: from file: Browse from camera: AW-HEAD 01 Get Image: Name: Limited Add Close

  1. Import the face data according to the procedure described below.

- When using an existing JPEG file:

If you click the Browse button for the "from file:" field, a dialog box for selecting the image file appears. Select the JPEG image showing the face.

- When capturing from the camera images:

Select the camera to use in the box for the "from camera:" field, and then click the Get button to perform capturing.

  1. The image is displayed in the center of the Register Face Data screen. If a face is detected in the image, a frame appears around the face.
    If a frame does not appear, repeat step 7.
  2. Click the frame of the face you want to register. The face image appears in the "Image:" field.
  3. Enter the name of the face data in the "Name:" field.
  4. If you click the Add button, the new face data that has been selected is registered.

  • If several faces are detected in the image, you can collectively register several face data instances by repeating steps 9 to 11 described above.
  • Up to 10 faces can be detected in one image.

Editing the Face Data

You can change the photograph and name in the already registered face data.

There are two methods of editing the face data, namely a method of using the existing JPEG image, and a method of using the image captured from camera images.

Edit the face data according to the procedure described below.

  1. Perform the same operation as in steps 1 to 4 of "Registering the Face Data" to display the Face Recognition screen.
  2. After selecting the face data to be registered by clicking its number part, click the Edit button at the top right of the screen.
  3. If you perform the same operation as in steps 6 to 11 of "Registering the Face Data", the face data changes.

Deleting the Face Data

Delete the registered face data according to the procedure described below.

  1. Perform the same operation as in steps 1 to 4 of “Registering the Face Data” to display the Face Recognition screen.
  2. After selecting the face data to be deleted by clicking its number part, click the Delete button at the top right of the screen.
  3. A window for confirmation of data deletion appears. If you click the Yes button, the face data is deleted.

- If the selected face data is being used by some camera, the Delete button is disabled, and you will not be able to delete the face data. To delete face data, make sure it is not in use by any camera.

If a camera is using face data that is to be deleted, the name of the camera is displayed as "Used by Camera 01" or something similar, when you place the mouse cursor on the face data.

Sorting the Face Data

You can sort the display order of the registered face data.

The display order of the face data affects the priority order of detection when tracking is performed with the Auto Face Search set to ON (when the tracking target is detected from among all persons for whom the face data is registered). The smaller the ID, the higher the priority order of detection.

  1. Perform the same operation as in steps 1 to 3 of "Registering the Face Data" to display the Face Recognition screen.
  2. Click the photograph of the face from the face data you want to sort, and drag it.
  3. If the dragged face data is dropped to the location of another face data, the face data moves to the dropped location.

Explanation of the Tracking Operation

Connecting to or Disconnecting from the Remote Camera

When performing the tracking process, you must connect to the remote camera, and when ending the tracking process, you must disconnect from the remote camera.

- Connection procedure

  1. On the View screen or Main screen, click the Connect button of the camera to be connected.

Auto Tracking Server Software 42 15 Camera 1 JACON Tracking Camera 2 ALAB Tracking Camera 3 RUBERT Stop Camera 4 WAL-TER Start Camera 5 ALAB Tracking Camera 6 RUBERT Stop Camera 7 WAL-TER Stop Camera 8 SLETS Start Camera 9 ALAB Tracking Camera 10 ARPT Tracking Camera 11 RUBERT Stop Camera 12 ALAB Start Camera 13 OFF OFF OFF OFF OFF

  1. If the connection is established properly, the Connect button changes to the Disconnect button.

• Disconnection procedure

  1. On the View screen or Main screen, click the Disconnect button of the camera to be disconnected.

Upper Limit of the Number of Cameras that can be Connected

This software can be connected to multiple remote cameras to perform the tracking operation in each camera, but the number of cameras that can be connected is restricted.

The upper limit of the number of cameras that can be connected is the smaller value of the below-described A and B.

A: Restriction based on the number of servers
The upper limit is the number of servers configuring this software x 4.

B: Restriction based on the license

The number of cameras described below is the upper limit.

During the trial use period: 16

When activation has been completed: Number of cameras in accordance with the activated license

When an attempt is made to connect more cameras than the upper limit, an error message is displayed. Click the Disconnect button of the connected cameras to disconnect the connection.

- The license usage status is displayed as “License (used/total)” at the top of the View screen or Main screen.

Starting the Tracking Process

- When tracking is started automatically

Tracking can be started by detecting the tracking target automatically.

The functions described below have been prepared as functions for automatic detection, and you can set whether or not to use each function.

- Detecting the face of the specified person by the face recognition function

Make the settings according to the procedure described below.

Auto Tracking Server Software View MAIN All Tracking Camera 1 JHON Disconnect Camera 2 ALEX Disconnect Tracking Camera 3 ROBERT Disconnect Stop Camera 4 WALTER Disconnect Camera 1 Tracking Face Recognition Start/Stop Setting ON/OFF JHON Select face Target Position Angle Pan/Flt Limitation SET Upper Body Full Body Full OFF Logged in as SF200Admin Camera Controller PIZ Zoom T Focus Far Slow Zoom T Focus Far Auto Image Adjust IRIS GAIN WB SHUTTER NO Auto AWB A OFF Through Auto AWB ABB USER 1 > 3 Web Camera Ctrl Go

  1. On the View screen or Main screen, click the Connect button of the camera for which the tracking process is to be performed to establish a connection with it.
  2. The Main screen appears.
  3. Select the camera for which operations are to be performed from the camera list display on the left end of the screen.
  4. To detect the face of the person set by the face recognition function, set the face recognition function according to the procedure below.

- When a specific person is the target

① Click the Select Face button to view the Select Face screen.
② On the Select Face screen, select the face data of the person to be set as the tracking target, and then click the OK button to close the Select Face screen.
③ Set the Face Recognition ON/OFF button to ON.
④ If the face of the tracking target is detected in the camera image, the tracking process is started.

- When the tracking target is to be detected from all persons for whom the face data is registered.

① Select the Auto Face Search checkbox.
② Set the Face Recognition ON/OFF button to ON.

③ If any person for whom the face data has been registered is detected in the camera image, the tracking process is started. The smaller the face data ID on the Settings - Face Recognition screen, the higher the priority order of detection.

  1. If you set the Tracking Start/Stop button to ON, the Pan/Tilt operation of the remote camera is enabled, and the tracking operation starts.

  • If in the Tracking Setting window displayed by the Setting button in the Tracking field, the check mark for Auto Tracking Start is ON, the Pan/Tilt operation of the remote camera is enabled at the same time when the tracking target is detected.
  • The face data setting of the face recognition function is stored for each camera.
  • When the remote camera is AW-UE4, tracking is performed by changing the position of the zoomed image. The orientation of the camera itself does not change.

- When tracking is started manually

To start tracking by selecting the tracking target manually, follow the procedure described below.

  1. On the View screen or Main screen, click the Connect button of the camera for which the tracking process is to be performed to establish a connection with it.
  2. The Main screen appears.
  3. Select the camera for which operations are to be performed from the camera list display on the left end of the screen.
  4. If face data for face recognition has been selected, click the Select Face button to display the Select Face screen, and cancel the selection of the face data.
  5. If you left-click the location to be tracked in a camera image, the tracking process starts by assuming the object at that location to be the tracking target.
  6. If you set the Tracking Start/Stop button to ON, the Pan/Tilt operation of the remote camera is enabled, and the tracking operation starts.

  • If the face of a person is detected at the location that was left-clicked in step 4, the corresponding face data is automatically set as the recognition source of face recognition. This face data is not stored. To cancel the set face data, select the Auto Face Search checkbox, and then deselect the Auto Face Search checkbox.
  • When a person's face is detected in a camera image and you double click the face, sets the face data as the recognition basis for face recognition. This face data is not stored. To cancel the set face data, select the Auto Face Search checkbox, and then deselect the Auto Face Search checkbox.
  • If in the Tracking Setting window displayed by the Setting button in the Tracking field, the check mark for Auto Tracking Start is ON, the Pan/Tilt operation of the remote camera is enabled at the same time when the tracking target is detected.
  • When the remote camera is AW-UE4, tracking is performed by changing the position of the zoomed image. The orientation of the camera itself does not change.

Discontinuing the Tracking Process

To discontinue the tracking process, perform the operation described below:

  1. If the Face Recognition ON/OFF button is in the ON state (red color), click the Face Recognition ON/OFF button to set it to the OFF state (gray color).
  2. Set the Tracking Start/Stop button to the OFF state (gray).
  3. The tracking process will be discontinued.

Changing the Tracking Target

To change the tracking target during the tracking operation, perform the operation described below.

- When the face recognition function is used

  1. Click the Select Face button to display the Select Face screen.
  2. On the Select Face screen, select the face data of the person to be set as the new tracking target, and then click the OK button to close the Select Face screen.
  3. Set the Face Recognition ON/OFF button to ON.
  4. If the face of the person set as the new tracking target is detected in a camera image, the tracking process is started.

- When a person's face is detected in a camera image and you double click the face, sets the face data as the recognition basis for face recognition. This face data is not stored. To cancel the set face data, select the Auto Face Search checkbox, and then deselect the Auto Face Search checkbox.

- When the face recognition function is not used

Left-click the camera image.

Processing is started with the object at the left-clicked location as the new tracking target.

Changing the Display Position of the Tracking Target

The display position of the tracking target is displayed as a white cross on the Main screen.

In the initial state, the tracking target is displayed in the center of the camera image.

To change the display position of the tracking target, perform the operation described below.

  1. The Main screen appears.

  2. Select the camera for which operations are to be performed from the camera list display on the left end of the screen.

  3. Set the Target Position Set button to the ON state (red color).

  4. Left-click the camera image to set the display position.

- You cannot set the display position at the outer periphery of the camera image.

Setting the Zoom Magnification during Tracking

You can set the zoom magnification during tracking according to the procedure described below:

Auto Tracking Server Software View MAIN Logged in as SF200Admin Camera 1 Camera Controller PTZ Pan/TSI Fast Zoom 1 Focus Fast Share Power Start/Stop Day/OFF JHON Select Face Image Adjust RIS GAIN WR SHUTTER ND Auto AWB A OFF Through Auto ABB USB 1 2 1 Web Camera Ctrl Gas

  1. The Main screen appears.

  2. Select the camera for which operations are to be performed from the camera list display on the left end of the screen.

  3. To manually set the Zoom magnification, make the settings with the Zoom position control slider/button of the camera controller.

  4. To set to a predetermined Zoom magnification, click any of the Upper Body / Full Body / Full buttons under Angle. The Zoom magnification will change according to the selected item.

  • If the Zoom magnification is changed significantly in a short period of time, the tracking target may be lost
  • If zooming is performed in the magnification direction in a state when the display position of the tracking target is other than the center of the screen, the tracking target may be lost.
  • If any one of Upper Body / Full Body / Full is selected under Angle, the Zoom magnification will change automatically according to the selected item when the tracking target is detected. If you do not want to change the Zoom magnification, set the Angle to OFF.
    • This function cannot be used when the remote camera is AW-UE4.

Tracking Target Detection Mask Area Setting

You can set the mask area (the area that is not used during detection within the camera images) when detecting the tracking target.

Make the settings according to the procedure described below.

Auto Tracking Server Software View MAIN All 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 Camera 1 Camera Controller PTZ Pan/YYR Text: Zoom: Focus: For: Start/Stop: ON/OFF: JHON: Select Face: Target Position: Angle: Pan/YYR Limitation: SET: Upper Body: Full Body: Full: OFF: SET: Upper Body: Full Body: Full: OFF: Image Adjust: WBS GAIN WB SHUTTER ND: Auto AWB A OFF Through: Auto AWS ABB USER 1 2 3 Web Camera CM Go

  1. The Main screen appears.
  2. Select the camera for which operations are to be performed from the camera list display on the left end of the screen.
  3. Operate the knob of the slider on the right side of the camera image to set the mask area at the top and bottom of the screen. The setting is reflected immediately.

Setting an Area in which the Tracking Operation of the Camera is Not to be Performed

In a camera image, you can set an area in which the tracking operation of the camera is not to be performed when the tracking target moves.

Make the settings according to the procedure described below.

Auto Tracking Server Software All Tracking Camera 1 JHON Disconnect Camera 2 ALER Disconnect Tracking Camera 3 ROBERT Disconnect Stop Camera 4 WALTER Disconnect View MAIN Camera 1 Tracing Face Recognition Start/Stop ON/OFF JHON Select Face Setting Angle Pan/TR Limitation SET Upper Body Full Body Full OFF - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

  1. The Main screen appears.
  2. Select the camera for which operations are to be performed from the camera list display on the left end of the screen.
  3. When you right-click the mouse on a camera image and then drag it, the region is displayed by a yellow line.

The setting is complete once the dragging operation of the mouse is complete.

(A value is set in the Tracking Disable Area of the Tracking Setting window displayed by clicking the Setting button in the Tracking field.)

  1. When canceling the area specification, right-click outside the range of the camera image.

(The value set in the Tracking Disable Area of the Tracking Setting window displayed by clicking the Setting button in the Tracking field is cleared.)

Setting the Pan/Tilt Limitation of the Camera

You can set the Pan/Tilt limitation of the remote camera.

Auto Tracking Server Software View MAIN Logged in as SF200Admin All Tracking Camera 1 JHON Disconnect Camera 2 ALER Document Tracking Camera 3 ROBERT Disconnect Stop Camera 4 WALTER Discount Camera 1 Training Face Recognition Start-Stop On-OFF JHON Select Face Target Position Angle Pan-TIR Limitation SET Upper Body Full Body Full OFF - - - - Image Adjust RIS GAIN WB SHUTTER ND Auto AWB A OFF Through Auto AWB ABB USER 1 2 3 Web Camera Ctrl Go

  1. The Main screen appears.
  2. Select the camera for which operations are to be performed from the camera list display on the left end of the screen.
  3. Set the limitation in each of the top, bottom, left, and right directions using the respective button of the Pan/Tilt Limitation item.

When the button is changed from the OFF (gray color) state to the ON (red color) state:

The position of the camera when it is turned ON is set as the limit of the working range of the camera in that direction.

When the button is changed from the ON (red color) state to the OFF (gray color) state:

The setting of the limitation in the direction in which the camera is turned OFF is canceled.

- This function cannot be used when the remote camera is AW-UE4.

Operations of the Camera Controller

About the Camera Controller

The camera controller can be used to perform various operations of the remote camera.

The supported operations are as described below.

  • PTZ operation
  • Registering / calling / deleting the preset
  • Adjusting the image
  • Calling the Web screen

When using the camera controller, you must enable the operations by following the procedure described below.

  1. Connect to the camera from the View screen or Main screen.
  2. Select the camera for which operations are to be performed from the camera list display of the View screen or Main screen.

PTZ Operation of the Camera

You can perform the Pan/Tilt and Zoom operations of the remote camera.

1 Pan/Tilt Fast Slow 2 PTZ Zoom T W Focus Far Near Auto 3 Preset 1 2 3 4 5 6 7 8 9 SET Image Adjust IRIS GAIN WB SHUTTER ND + Auto AWB A OFF Through - Auto AWB ABB USER 1 2 3 Web Camera Ctrl Go

①Pan/Tilt speed control part

Set the movement speed of the camera when it is moved by the Pan/Tilt button or slider. The currently set value is displayed by the red-colored bar of the slider.

②Pan/Tilt control part

If you click this button, the camera moves in the corresponding direction.

If you click the circular button in the center of the operation area, the operation area display switches and you can move the camera in the direction you desire by dragging with the mouse.

③ Zoom position control part

Set the Zoom position of the remote camera by the T/W button or slider.

The currently set value is displayed by the red-colored bar of the slider.

- If the Pan/Tilt button is operated during the tracking operation, the tracking operation will be interrupted.

- When the remote camera is AW-UE4, the slider of the Zoom position control part is not displayed.

Registering / Calling / Deleting the Preset

You can register, call, or delete the preset of a remote camera.

PTZ Pan/Tilt Fast Slow Zoom T W Focus Far Near Auto Preset 1 2 3 4 5 6 7 8 9 SET Image Adjust IRIS GAIN WB SHUTTER ND + - Auto AWB A OFF Through - - Auto AWB ABB USER 1 2 3 Web Camera Ctrl Go

- Registering the preset

  1. Move the camera to the position that you want to register using the Pan/Tilt button and Zoom position control slider/button
  2. Click the SET button at the bottom left of the Preset area to set the camera to the ON state (red color).
  3. Click any one of the Preset 1 to Preset 9 buttons in the Preset area to register the current camera position in the preset. The thumbnail during registration is displayed on the button.

- Calling the preset

  1. Click the SET button at the bottom left of the Preset area to set the camera to the OFF state (gray color).

  2. Click any one of the Preset 1 to Preset 9 buttons in the Preset area to call the preset.

- Deleting the preset

  1. Click the Clear button at the bottom right of the Preset area to set the camera to the ON state (red color).
  2. Click any one of the Preset 1 to Preset 9 buttons in the Preset area to delete the preset.

- If the preset calling operation is performed during the tracking operation, the tracking operation will be interrupted.

Adjusting the Image of the Remote Camera

You can adjust the images shot by the remote camera.

The items described below can be adjusted:

  • Focus
  • Iris
  • Gain
  • White balance
  • Shutter
  • ND Filter

PTZ Pan/Tilt Fast Slow Zoom T W Focus Far Near Auto Preset 1 2 3 4 5 6 7 8 9 SET 2 3 Imac adjust 5 6 IRIS GAIN WB SHUTTER ND + Auto AWB A OFF Through - Auto AWB ABB USER 1 2 3 Web Camera Ctrl Go

① Focus control part

Click Auto to turn AutoFocus to ON or OFF.

When AutoFocus is ON, the remote camera sets the focus automatically.

When AutoFocus is OFF, the focus of the remote camera is set by the Far/Near buttons and the slider.

② Iris control part

Click Auto to turn Autolris to ON or OFF.

When AutoIris is ON, the remote camera sets the iris automatically.

When AutoIris is OFF, the iris of the remote camera is set by the +/- buttons and the slider.

③ Gain control part

Set the Gain of the remote camera by the Up/Down buttons.

④ WB control part

Set the white balance mode of the remote camera by the Up/Down buttons.

If you click the AWB button, the remote camera performs the white balance adjustment automatically.

If you click the ABB button, the remote camera performs the black balance adjustment automatically.

⑤ Shutter control part

Set the shutter of the remote camera by the Up/Down buttons.

⑥ ND Filter control part

Set the ND Filter of the remote camera by the Up/Down buttons.

- It may not be possible to adjust some items depending on the type of the remote camera and combination of the operation modes. For details, refer to the operation manual of each remote camera.

Calling the Web Screen of the Camera

You can call the Web screen of the remote camera.

PTZ Pan/Tilt Fast Slow Zoom T W Focus Far Near Auto Preset 1 2 3 4 5 6 7 8 9 SET Image Adjust IRIS GAIN WB SHUTTER ND + Auto AWB A OFF Through - - Auto AWB ABB USER 1 2 3 Web Camera Ctrl Go

Click the Go button at the bottom right of the camera controller to open the Web management screen of the remote camera in another tab of the Web browser.

Depending on your Web browser, symptoms such as disorder of part of the Web management screen of the remote camera may occur.

License

About the License

When using this software, you will require one license for connecting to one camera. Therefore, the number of cameras that can be connected simultaneously is restricted to the number of registered licenses.

The conditions of license consumption and return are as described below.

License consumption:

- One license is consumed during connection to a remote camera.

License return:

- One license is returned during disconnection from a remote camera.

- One license is returned when the state of communication disconnection from the remote camera continues for five minutes or more.

- The license usage status is displayed as “License (used/total)” at the top of the View screen or Main screen.

About the Trial Use Period

The trial use period of this software is 90 days during which the license of 16 remote cameras can be used free of charge.

The procedure for starting trial use is as described below.

Procedure for starting trial use

  1. Log in to the Master server Windows.

  2. Run

PActivationManager.exe

from the "12_Activation" folder of the downloaded file.

  1. When you start the activation program for the first time, a screen for registering user information appears. Enter the information in each item, and then click the Apply button.

Edit User Infomation Organization : Country : Select... System ID : AW-SF100:4849409520190120202623 Apply Cancel

  1. The window of the activation program is displayed.

Auto Tracking Server Activation Manager File Tool Help MODE : Normal Mode Model No Model Name Status Date Remarks KeyCode Update 2017/06/27 15:50:10 Trial Activation Deactivation Quit

  1. Click the Trial button.

  2. You can start using this software for the trial period.

- The remaining number of days of the trial use period is displayed on the top right of the View screen/Main screen.

Activation Registration

The free-of-charge license becomes invalid after the end of the trial use period, and you can no longer establish a connection to the remote camera.

To continue using the software, you must purchase a key code, and add the license by performing activation registration according to the procedure described below.

Procedure of activation registration

  1. Connect the Master server to the Internet.

  2. Log in to the Master server Windows.

  3. Run

PActivationManager.exe

from the "12_Activation" folder of the downloaded file.

  1. The window of the activation program is displayed.

Auto Tracking Server Activation Manager File Tool Help MODE : Normal Mode Model No Model Name Status Data RRemarks工程项目 KeyCode W0200 AW-SF200 for Panasonic Activated :20170627 20170627 Auto Tracking Server (AW-SF200) W0200- W0200 AW-SF200 for Panasonic Activated :20170627 20170627 Auto Tracking Server (AW-SF200) W0200- W0202 AW-SF202 for Panasonic Activated :20170627 20170627 Auto Tracking Server (AW-SF202) W0202- W0203 AW-SF203 for Panasonic Activated :20170627 20170627 Auto Tracking Server (AW-SF203) W0203- Update 2017/06/27 14:25:24 Trial Activation Deactivation Quit

  1. Click the Activation button.
  2. The key code input screen appears. Enter the key code that you have purchased in the key code input field.
  3. When you click the OK button, activation is performed, and licenses are added according to the registered key code.

Activation Cancellation

To change the Master server on which you are using this software, perform activation cancellation according to the procedure described below, and then perform activation registration on a new Master server.

Procedure of activation cancellation

  1. Connect the Master server to the Internet.
  2. Log in to the Master server Windows.
  3. Run

PActivationManager.exe

from the "12_Activation" folder of the downloaded file.

  1. The window of the activation program is displayed.

Auto Tracking Server Activation Manager File Tool Help MODE : Normal Mode Model No Model Name Status Data RRemarks WayCode W0200 AW-SF200 for Panasonic Activated :20170627 20170627 Auto Tracking Server (AW-SF200) W0200- W0200 AW-SF200 for Panasonic Activated :20170627 20170627 Auto Tracking Server (AW-SF200) W0200- W0202 AW-SF202 for Panasonic Activated :20170627 20170627 Auto Tracking Server (AW-SF202) W0202- W0203 AW-SF203 for Panasonic Activated :20170627 20170627 Auto Tracking Server (AW-SF203) W0203- Update 2017/06/27 14:25:24 Trial Activation Deactivation Quit

  1. Select the column of the key code you want to cancel and then click the Deactivation button.
  2. The activation is canceled, and licenses are deleted according to the canceled key code.

- When you perform activation cancellation, you can no longer use this software on the Master server until you perform activation registration again.

Appendix

Keyboard shortcut

Some operations can be performed from the keyboard connected to the PC.

The operations assigned to keys are as below.

KeyOperation
F1Call preset 1
F2Call preset 2
F3Call preset 3
F4Call preset 4
F5Call preset 5
F6Call preset 6
F7Call preset 7
F8Call preset 8
F9Call preset 9
Camera tilt Upward
Camera tilt Downward
Camera pan Left
Camera pan Right
↑ + →Camera pan/tilt Up/Right
→ + ↓Camera pan/tilt Down/Right
↓ + ←Camera pan/tilt Down/Left
← + ↑Camera pan/tilt Up/Left
Shift + ↑Camera tilt Upward (high speed)
Shift + ↓Camera tilt Downward (high speed)
Shift + ←Camera pan Left (high speed)
Shift + →Camera pan Right (high speed)
Shift + ↑ + →Camera pan/tilt Up/Right (high speed)
Shift + → + ↓Camera pan/tilt Down/Right (high speed)
Shift + ↓ + ←Camera pan/tilt Down/Left (high speed)
Shift + ← + ↑Camera pan/tilt Left/Right (high speed)
Upper case ‘T’Camera zoom IN
Upper case ‘W’Camera zoom OUT
Upper case ‘S’Switch Tracking Start/Stop
CtrlPause tracking only while the key is pressed

Troubleshooting

This section shows the causes of the symptoms that occur during the execution of this software, and the actions to be taken:

Cannot connect to the camera even after performing the remote camera connection process.

Cause 1:

- The PC and remote camera are not connected properly.

Action 1:

- Make sure the PC and the remote camera are properly connected via the network, and that the remote camera IP address on the Settings - Camera screen of this software is set correctly.

Cause 2:

• There is no available license.

Action 2:

- When using this software, you will require one license for connecting to one camera. Therefore, the number of cameras that can be connected simultaneously is restricted to the number of registered licenses. If the number of connected cameras has reached the upper limit of the number of licenses, disconnect any one of the connected cameras.

Cause 3:

- The connected number of remote cameras of the server has reached the limit.

Action 3:

- Up to four remote cameras can be connected per one server when using this software. If the number of connected remote cameras has reached the limit, disconnect any one of the connected cameras.

The images are not displayed properly on the screen after connecting to a remote camera.

Cause 1:

- You are not using the latest version of the remote camera firmware.

Action 1:

- Download the latest version of the remote camera firmware from the Website provided below, and update the firmware.

http://pro-av.panasonic.net/en/

Cause 2:

- The settings of the remote camera have not been made properly.

Action 2:

- Carefully read "Default Settings - Remote Camera Settings" in the Installation Procedures of this software, and set the remote camera accordingly.

The tracking target switches to another object during the tracking operation.

Cause 1:

- There is an object that is moving close to the original tracking target.

Action 1:

- If there is a moving object close to the tracking target (within the white rectangle), the tracking target may switch to that moving object. Make sure there is no moving object close to the object that is to be set as the tracking target.

Cause 2:

- A stationary object with strong straight-line edges exists in the background.

Action 2:

- If a stationary object (straight-line edges) enters inside the red frame during tracking, the tracking target may switch to that object.

The tracking target is lost out of sight during the tracking operation.

Cause:

- The tracking target is a stationary object.

Action:

- If the tracking target is a stationary object, the tracking target may be lost out of sight.

Even if the tracking target is lost out of sight, tracking is resumed when the tracking target again enters the frame of the camera image.

When there are several persons in the camera image, an unintended person is set as the tracking target.

Cause:

- An object that is moving more than the object to be set as the target exists.

Action:

- Set the face data of the person to be tracked, and then set the Face Recognition ON/OFF button to the ON state (red color). Since face recognition starts functioning and the face of the person can be detected, the tracking operation is likely to improve.

- The tracking operation is likely to improve by setting an automatic detection mask area and an area in which detection is not required.

Uninstallation Procedure

  1. From the Windows Control Panel, select [Programs and Features].
  2. If you select [Auto Tracking Server Software] from the list of programs and then click [Uninstall], a confirmation screen appears.
  3. Click [Yes] on the confirmation screen to uninstall the software.

- To stop the operation of this software, make the settings described below from the service management screen of Windows.

  1. Stop the two services, namely “Panasonic Auto Tracking Server (SF200)” and “Panasonic Tracking Control (SF200)”.
  2. Change the Startup Type of the “Panasonic Auto Tracking Server (SF200)” and “Panasonic Tracking Control (SF200)” services to “Manual”.

When changing the IP address of Master server

If you change the IP address of the Master server after installing this software, implement the following procedure for the Master server and each Slave server to change the settings of the software.

  1. Run the IpAddressSetupTool.exe in the 13_IpAddressSetup folder of the file downloaded for this software.
  2. The screen below appears.

If you are running it on the Master server, select Setup as Master Server and enter the Master server IP address in the Master Server Address field.

If you are running it on a Slave server, select Setup as Slave Server and enter the Master server IP address in the Master Server Address field.

Auto Tracking Server Setup for Web Ap... Please input System Setting System Setting ● Setup as Master Server ○ Setup as Slave Server Master Server Address 192.168.0.206 Setup

  1. Restart the Master server and each Slave server.

Software Information Relating to This Product

  1. This product includes software developed by the OpenSSL Project for use in the OpenSSL Toolkit (http://www.openssl.org/).
  2. Software licensed in accordance with the Microsoft Public License is included in this software.
  3. Software licensed in accordance with the OpenBSD License is included in this software.
  4. Software licensed in accordance with the BSD License is included in this software.
  5. Software licensed in accordance with the Apache License is included in this software.

Microsoft Public License (Ms-PL)

Published: October 12, 2006

This license governs use of the accompanying software. If you use the software, you accept this license. If you do not accept the license, do not use the software.

  1. Definitions

The terms “reproduce,” “reproduction,” “derivative works,” and “distribution” have the same meaning here as under U.S. copyright law.

A “contribution” is the original software, or any additions or changes to the software.

A “contributor” is any person that distributes its contribution under this license.

“Licensed patents” are a contributor’s patent claims that read directly on its contribution.

  1. Grant of Rights

(A) Copyright Grant- Subject to the terms of this license, including the license conditions and limitations in section 3, each contributor grants you a non-exclusive, worldwide, royalty-free copyright license to reproduce its contribution, prepare derivative works of its contribution, and distribute its contribution or any derivative works that you create.

(B) Patent Grant- Subject to the terms of this license, including the license conditions and limitations in section 3, each contributor grants you a non-exclusive, worldwide, royalty-free license under its licensed patents to make, have made, use, sell, offer for sale, import, and/or otherwise dispose of its contribution in the software or derivative works of the contribution in the software.

  1. Conditions and Limitations

(A) No Trademark License- This license does not grant you rights to use any contributors' name, logo, or trademarks.
(B) If you bring a patent claim against any contributor over patents that you claim are infringed by the software, your patent license from such contributor to the software ends automatically.
(C) If you distribute any portion of the software, you must retain all copyright, patent, trademark, and attribution notices that are present in the software.
(D) If you distribute any portion of the software in source code form, you may do so only under this license by including a complete copy of this license with your distribution. If you distribute any portion of the software in compiled or object code form, you may only do so under a license that complies with this license.
(E) The software is licensed “as-is.” You bear the risk of using it. The contributors give no express warranties, guarantees or conditions. You may have additional consumer rights under your local laws which this license cannot change. To the extent permitted under your local laws, the contributors exclude the implied warranties of merchantability, fitness for a particular purpose and non-infringement.

By downloading, copying, installing or using the software you agree to this license.

If you do not agree to this license, do not download, install, copy or use the software.

License Agreement

For Open Source Computer Vision Library

(3-clause BSD License)

Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met:

* Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer.
* Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution.
* Neither the names of the copyright holders nor the names of the contributors may be used to endorse or promote products derived from this software without specific prior written permission.

This software is provided by the copyright holders and contributors "as is" and

any express or implied warranties, including, but not limited to, the implied warranties of merchantability and fitness for a particular purpose are disclaimed. In no event shall copyright holders or contributors be liable for any direct, indirect, incidental, special, exemplary, or consequential damages (including, but not limited to, procurement of substitute goods or services; loss of use, data, or profits; or business interruption) however caused and on any theory of liability, whether in contract, strict liability, or tort (including negligence or otherwise) arising in any way out of the use of this software, even if advised of the possibility of such damage.

Apache License

Version 2.0, January 2004

http://www.apache.org/licenses/

TERMS AND CONDITIONS FOR USE, REPRODUCTION, AND DISTRIBUTION

1. Definitions.

"License" shall mean the terms and conditions for use, reproduction, and distribution as defined by Sections 1 through 9 of this document.

"Licensor" shall mean the copyright owner or entity authorized by the copyright owner that is granting the License.

"Legal Entity" shall mean the union of the acting entity and all other entities that control, are controlled by, or are under common control with that entity. For the purposes of this definition, "control" means (i) the power, direct or indirect, to cause the direction or management of such entity, whether by contract or otherwise, or (ii) ownership of fifty percent (50%) or more of the outstanding shares, or (iii) beneficial ownership of such entity.

"You" (or "Your") shall mean an individual or Legal Entity exercising permissions granted by this License.

"Source" form shall mean the preferred form for making modifications, including but not limited to software source code, documentation

source, and configuration files.

"Object" form shall mean any form resulting from mechanical transformation or translation of a Source form, including but not limited to compiled object code, generated documentation, and conversions to other media types.

"Work" shall mean the work of authorship, whether in Source or Object form, made available under the License, as indicated by a copyright notice that is included in or attached to the work (an example is provided in the Appendix below).

"Derivative Works" shall mean any work, whether in Source or Object form, that is based on (or derived from) the Work and for which the editorial revisions, annotations, elaborations, or other modifications represent, as a whole, an original work of authorship. For the purposes of this License, Derivative Works shall not include works that remain separable from, or merely link (or bind by name) to the interfaces of, the Work and Derivative Works thereof.

"Contribution" shall mean any work of authorship, including the original version of the Work and any modifications or additions to that Work or Derivative Works thereof, that is intentionally submitted to Licensor for inclusion in the Work by the copyright owner or by an individual or Legal Entity authorized to submit on behalf of the copyright owner. For the purposes of this definition, "submitted" means any form of electronic, verbal, or written communication sent to the Licensor or its representatives, including but not limited to communication on electronic mailing lists, source code control systems, and issue tracking systems that are managed by, or on behalf of, the Licensor for the purpose of discussing and improving the Work, but excluding communication that is conspicuously marked or otherwise designated in writing by the copyright owner as "Not a Contribution."

"Contributor" shall mean Licensor and any individual or Legal Entity on behalf of whom a Contribution has been received by Licensor and subsequently incorporated within the Work.

  1. Grant of Copyright License. Subject to the terms and conditions of this License, each Contributor hereby grants to You a perpetual, worldwide, non-exclusive, no-charge, royalty-free, irrevocable copyright license to reproduce, prepare Derivative Works of, publicly display, publicly perform, sublicense, and distribute the Work and such Derivative Works in Source or Object form.

  2. Grant of Patent License. Subject to the terms and conditions of this License, each Contributor hereby grants to You a perpetual, worldwide, non-exclusive, no-charge, royalty-free, irrevocable (except as stated in this section) patent license to make, have made, use, offer to sell, sell, import, and otherwise transfer the Work, where such license applies only to those patent claims licensable by such Contributor that are necessarily infringed by their Contribution(s) alone or by combination of their Contribution(s) with the Work to which such Contribution(s) was submitted. If You institute patent litigation against any entity (including a cross-claim or counterclaim in a lawsuit) alleging that the Work or a Contribution incorporated within the Work constitutes direct or contributory patent infringement, then any patent licenses granted to You under this License for that Work shall terminate as of the date such litigation is filed.

  3. Redistribution. You may reproduce and distribute copies of the Work or Derivative Works thereof in any medium, with or without modifications, and in Source or Object form, provided that You meet the following conditions:

(a) You must give any other recipients of the Work or Derivative Works a copy of this License; and

(b) You must cause any modified files to carry prominent notices stating that You changed the files; and

(c) You must retain, in the Source form of any Derivative Works that You distribute, all copyright, patent, trademark, and attribution notices from the Source form of the Work, excluding those notices that do not pertain to any part of

the Derivative Works; and

(d) If the Work includes a "NOTICE" text file as part of its distribution, then any Derivative Works that You distribute must include a readable copy of the attribution notices contained within such NOTICE file, excluding those notices that do not pertain to any part of the Derivative Works, in at least one of the following places: within a NOTICE text file distributed as part of the Derivative Works; within the Source form or documentation, if provided along with the Derivative Works; or, within a display generated by the Derivative Works, if and wherever such third-party notices normally appear. The contents of the NOTICE file are for informational purposes only and do not modify the License. You may add Your own attribution notices within Derivative Works that You distribute, alongside or as an addendum to the NOTICE text from the Work, provided that such additional attribution notices cannot be construed as modifying the License.

You may add Your own copyright statement to Your modifications and may provide additional or different license terms and conditions for use, reproduction, or distribution of Your modifications, or for any such Derivative Works as a whole, provided Your use, reproduction, and distribution of the Work otherwise complies with the conditions stated in this License.

  1. Submission of Contributions. Unless You explicitly state otherwise, any Contribution intentionally submitted for inclusion in the Work by You to the Licensor shall be under the terms and conditions of this License, without any additional terms or conditions. Notwithstanding the above, nothing herein shall supersede or modify the terms of any separate license agreement you may have executed with Licensor regarding such Contributions.

  2. Trademarks. This License does not grant permission to use the trade names, trademarks, service marks, or product names of the Licensor, except as required for reasonable and customary use in describing the origin of the Work and reproducing the content of the NOTICE file.

  3. Disclaimer of Warranty. Unless required by applicable law or agreed to in writing, Licensor provides the Work (and each Contributor provides its Contributions) on an "AS IS" BASIS, WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied, including, without limitation, any warranties or conditions of TITLE, NON-INFRINGEMENT, MERCHANTABILITY, or FITNESS FOR A PARTICULAR PURPOSE. You are solely responsible for determining the appropriateness of using or redistributing the Work and assume any risks associated with Your exercise of permissions under this License.

  4. Limitation of Liability. In no event and under no legal theory, whether in tort (including negligence), contract, or otherwise, unless required by applicable law (such as deliberate and grossly negligent acts) or agreed to in writing, shall any Contributor be liable to You for damages, including any direct, indirect, special, incidental, or consequential damages of any character arising as a result of this License or out of the use or inability to use the Work (including but not limited to damages for loss of goodwill, work stoppage, computer failure or malfunction, or any and all other commercial damages or losses), even if such Contributor has been advised of the possibility of such damages.

  5. Accepting Warranty or Additional Liability. While redistributing the Work or Derivative Works thereof, You may choose to offer, and charge a fee for, acceptance of support, warranty, indemnity, or other liability obligations and/or rights consistent with this License. However, in accepting such obligations, You may act only on Your own behalf and on Your sole responsibility, not on behalf of any other Contributor, and only if You agree to indemnify, defend, and hold each Contributor harmless for any liability incurred by, or claims asserted against, such Contributor by reason of your accepting any such warranty or additional liability.

END OF TERMS AND CONDITIONS

APPENDIX: How to apply the Apache License to your work.

To apply the Apache License to your work, attach the following boilerplate notice, with the fields enclosed by brackets "[]" replaced with your own identifying information. (Don't include the brackets!) The text should be enclosed in the appropriate comment syntax for the file format. We also recommend that a file or class name and description of purpose be included on the same "printed page" as the copyright notice for easier identification within third-party archives.

Copyright [yyyy] [name of copyright owner]

Licensed under the Apache License, Version 2.0 (the "License"); you may not use this file except in compliance with the License. You may obtain a copy of the License at

http://www.apache.org/licenses/LICENSE-2.0

Unless required by applicable law or agreed to in writing, software distributed under the License is distributed on an "AS IS" BASIS, WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied. See the License for the specific language governing permissions and limitations under the License.

Software licensed in accordance with the following licenses is included in this software.

PostgreSQL Data Base Management System

Portions Copyright (c) 1996-2010, PostgreSQL Global Development Group Portions Copyright (c) 1994-1996 Regents of the University of California

Permission to use, copy, modify, and distribute this software and its documentation for any purpose, without fee, and without a written agreement is hereby granted, provided that the above copyright notice and this paragraph and the following two paragraphs appear in all copies.

IN NO EVENT SHALL THE UNIVERSITY OF CALIFORNIA BE LIABLE TO ANY PARTY FOR DIRECT, INDIRECT, SPECIAL, INCIDENTAL, OR CONSEQUENTIAL DAMAGES, INCLUDING LOST PROFITS, ARISING OUT OF THE USE OF THIS SOFTWARE AND ITS DOCUMENTATION, EVEN IF THE UNIVERSITY OF CALIFORNIA HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

THE UNIVERSITY OF CALIFORNIA SPECIFICALLY DISCLAIMS ANY WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. THE SOFTWARE PROVIDED HEREUNDER IS ON AN "AS IS" BASIS, AND THE UNIVERSITY OF CALIFORNIA HAS NO OBLIGATIONS TO PROVIDE MAINTENANCE, SUPPORT, UPDATES, ENHANCEMENTS, OR MODIFICATIONS.

Boost Software License - Version 1.0 - August 17th, 2003

Permission is hereby granted, free of charge, to any person or organization obtaining a copy of the software and accompanying documentation covered by this license (the "Software") to use, reproduce, display, distribute, execute, and transmit the Software, and to prepare derivative works of the Software, and to permit third-parties to whom the Software is furnished to do so, all subject to the following:

The copyright notices in the Software and this entire statement, including the above license grant, this restriction and the following disclaimer, must be included in all copies of the Software, in whole or in part, and all derivative works of the Software, unless such copies or derivative works are solely in the form of machine-executable object code generated by a source language processor.

THE SOFTWARE IS PROVIDED "AS IS", WITHOUT WARRANTY OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO THE WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, TITLE AND NON-INFRINGEMENT. IN NO EVENT SHALL THE COPYRIGHT HOLDERS OR ANYONE DISTRIBUTING THE SOFTWARE BE LIABLE FOR ANY DAMAGES OR OTHER LIABILITY, WHETHER IN CONTRACT, TORT OR OTHERWISE, ARISING FROM, OUT OF OR IN CONNECTION WITH THE SOFTWARE OR THE USE OR OTHER DEALINGS IN THE SOFTWARE.

Copyright (c) 2006, Google Inc.

All rights reserved.

Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met:

* Redistributions of source code must retain the above copyright

notice, this list of conditions and the following disclaimer.

* Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution.
* Neither the name of Google Inc. nor the names of its contributors may be used to endorse or promote products derived from this software without specific prior written permission.

THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND CONTRIBUTORS "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE COPYRIGHT OWNER OR CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

Copyright (c) 2008, Google Inc.

All rights reserved.

Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met:

* Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer.
* Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution.
* Neither the name of Google Inc. nor the names of its contributors may be used to endorse or promote products derived from this software without specific prior written permission.

THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND CONTRIBUTORS "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE COPYRIGHT OWNER OR CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

A function gettimeofday in utilities.cc is based on

http://www.google.com/codesearch/p?hl=en#dR3YEbitojA/COPYING&q=GetSystemTimeAsFileTime%20license:bsd

The license of this code is:

Copyright (c) 2003-2008, Jouni Malinen j@w1.fi and contributors All Rights Reserved.

Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met:

  1. Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer.

  2. Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution.

  3. Neither the name(s) of the above-listed copyright holder(s) nor the names of its contributors may be used to endorse or promote products derived from this software without specific prior written permission.

THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND CONTRIBUTORS

"AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE COPYRIGHT OWNER OR CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

Copyright Notice and License Terms for HDF5 (Hierarchical Data Format 5) Software Library and Utilities

HDF5 (Hierarchical Data Format 5) Software Library and Utilities Copyright 2006-2013 by The HDF Group.

NCSA HDF5 (Hierarchical Data Format 5) Software Library and Utilities Copyright 1998-2006 by the Board of Trustees of the University of Illinois.

All rights reserved.

Redistribution and use in source and binary forms, with or without modification, are permitted for any purpose (including commercial purposes) provided that the following conditions are met:

  1. Redistributions of source code must retain the above copyright notice, this list of conditions, and the following disclaimer.
  2. Redistributions in binary form must reproduce the above copyright notice, this list of conditions, and the following disclaimer in the documentation and/or materials provided with the distribution.
  3. In addition, redistributions of modified forms of the source or binary code must carry prominent notices stating that the original code was changed and the date of the change.

  4. All publications or advertising materials mentioning features or use of this software are asked, but not required, to acknowledge that it was developed by The HDF Group and by the National Center for Supercomputing Applications at the University of Illinois at Urbana-Champaign and credit the contributors.

  5. Neither the name of The HDF Group, the name of the University, nor the name of any Contributor may be used to endorse or promote products derived from this software without specific prior written permission from The HDF Group, the University, or the Contributor, respectively.

DISCLAIMER:

THIS SOFTWARE IS PROVIDED BY THE HDF GROUP AND THE CONTRIBUTORS "AS IS" WITH NO WARRANTY OF ANY KIND, EITHER EXPRESSED OR IMPLIED. In no event shall The HDF Group or the Contributors be liable for any damages suffered by the users arising out of the use of this software, even if advised of the possibility of such damage.

Contributors: National Center for Supercomputing Applications (NCSA) at the University of Illinois, Fortner Software, Unidata Program Center (netCDF), The Independent JPEG Group (JPEG), Jean-loup Gailly and Mark Adler (gzip), and Digital Equipment Corporation (DEC).

Portions of HDF5 were developed with support from the Lawrence Berkeley National Laboratory (LBNL) and the United States Department of Energy under Prime Contract No. DE-AC02-05CH11231.

Portions of HDF5 were developed with support from the University of California, Lawrence Livermore National Laboratory (UC LLNL). The following statement applies to those portions of the product and must be retained in any redistribution of source code, binaries, documentation,

and/or accompanying materials:

This work was partially produced at the University of California, Lawrence Livermore National Laboratory (UC LLNL) under contract no. W-7405-ENG-48 (Contract 48) between the U.S. Department of Energy (DOE) and The Regents of the University of California (University) for the operation of UC LLNL.

DISCLAIMER:

This work was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the University of California nor any of their employees, makes any warranty, express or implied, or assumes any liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately-owned rights. Reference herein to any specific commercial products, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or the University of California. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or the University of California, and shall not be used for advertising or product endorsement purposes.

Copyright (c) 2011 The LevelDB Authors. All rights reserved.

Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met:

* Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer.
* Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution.
* Neither the name of Google Inc. nor the names of its contributors may be used to endorse or promote products derived from

this software without specific prior written permission.

THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND CONTRIBUTORS "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE COPYRIGHT OWNER OR CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

The OpenLDAP Public License

Version 2.8, 17 August 2003

Redistribution and use of this software and associated documentation ("Software"), with or without modification, are permitted provided that the following conditions are met:

  1. Redistributions in source form must retain copyright statements and notices,
  2. Redistributions in binary form must reproduce applicable copyright statements and notices, this list of conditions, and the following disclaimer in the documentation and/or other materials provided with the distribution, and
  3. Redistributions must contain a verbatim copy of this document.

The OpenLDAP Foundation may revise this license from time to time. Each revision is distinguished by a version number. You may use this Software under terms of this license revision or under the terms of any subsequent revision of the license.

THIS SOFTWARE IS PROVIDED BY THE OPENLDAP FOUNDATION AND ITS CONTRIBUTORS "AS IS" AND ANY EXPRESSED OR IMPLIED WARRANTIES,

INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE OPENLDAP FOUNDATION, ITS CONTRIBUTORS, OR THE AUTHOR(S) OR OWNER(S) OF THE SOFTWARE BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

The names of the authors and copyright holders must not be used in advertising or otherwise to promote the sale, use or other dealing in this Software without specific, written prior permission. Title to copyright in this Software shall at all times remain with copyright holders.

OpenLDAP is a registered trademark of the OpenLDAP Foundation.

Copyright 1999-2003 The OpenLDAP Foundation, Redwood City, California, USA. All Rights Reserved. Permission to copy and distribute verbatim copies of this document is granted.

Copyright (c) 2011-2014, The OpenBLAS Project All rights reserved.

Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met:

  1. Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer.
  2. Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution.

  3. Neither the name of the OpenBLAS project nor the names of its contributors may be used to endorse or promote products derived from this software without specific prior written permission.

THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND CONTRIBUTORS "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE COPYRIGHT OWNER OR CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

This license applies to all parts of Protocol Buffers except the following:

- Atomicops support for generic gcc, located in src/google/protobuf/stubs/atomicops_internals_generic_gcc.h. This file is copyrighted by Red Hat Inc.

- Atomicops support for AIX/POWER, located in src/google/protobuf/stubs/atomicops_internals_power.h. This file is copyrighted by Bloomberg Finance LP.

Copyright 2014, Google Inc. All rights reserved.

Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met:

* Neither the name of Google Inc. nor the names of its contributors may be used to endorse or promote products derived from this software without specific prior written permission.

THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND CONTRIBUTORS "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE COPYRIGHT OWNER OR CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

Code generated by the Protocol Buffer compiler is owned by the owner of the input file used when generating it. This code is not standalone and requires a support library to be linked with it. This support library is itself covered by the above license.

Faster R-CNN

The MIT License (MIT)

Copyright (c) 2015 Microsoft Corporation

Permission is hereby granted, free of charge, to any person obtaining a copy of this software and associated documentation files (the "Software"), to deal in the Software without restriction, including without limitation the rights to use, copy, modify, merge, publish, distribute, sublicense, and/or sell copies of the Software, and to permit persons to whom the Software is furnished to do so, subject to the following conditions:

The above copyright notice and this permission notice shall be included in all copies or substantial portions of the Software.

THE SOFTWARE IS PROVIDED "AS IS", WITHOUT WARRANTY OF ANY KIND, EXPRESS OR

IMPLIED, INCLUDING BUT NOT LIMITED TO THE WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT. IN NO EVENT SHALL THE AUTHORS OR COPYRIGHT HOLDERS BE LIABLE FOR ANY CLAIM, DAMAGES OR OTHER LIABILITY, WHETHER IN AN ACTION OF CONTRACT, TORT OR OTHERWISE, ARISING FROM, OUT OF OR IN CONNECTION WITH THE SOFTWARE OR THE USE OR OTHER DEALINGS IN THE SOFTWARE.

THIRD-PARTY SOFTWARE NOTICES AND INFORMATION

This project, Faster R-CNN, incorporates material from the project(s) listed below (collectively, "Third Party Code"). Microsoft is not the original author of the Third Party Code. The original copyright notice and license under which Microsoft received such Third Party Code are set out below. This Third Party Code is licensed to you under their original license terms set forth below. Microsoft reserves all other rights not expressly granted, whether by implication, estoppel or otherwise.

1. Caffe, (https://github.com/BVLC/caffe/)

All contributions by the University of California: Copyright (c) 2014, 2015, The Regents of the University of California (Regents) All rights reserved.

All other contributions: Copyright (c) 2014, 2015, the respective contributors All rights reserved.

Caffe uses a shared copyright model: each contributor holds copyright over their contributions to Caffe. The project versioning records all such contribution and copyright details. If a contributor wants to further mark their specific copyright on a particular contribution, they should indicate their copyright solely in the commit message of the change when it is committed.

The BSD 2-Clause License

Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met:

  1. Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer.
  2. Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution.

THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND CONTRIBUTORS "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE COPYRIGHT HOLDER OR CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

**********END OF THIRD-PARTY SOFTWARE NOTICES AND INFORMATION**********

PSF LICENSE AGREEMENT FOR PYTHON 2.7.13

  1. This LICENSE AGREEMENT is between the Python Software Foundation ("PSF"), and the Individual or Organization ("Licensee") accessing and otherwise using Python 2.7.13 software in source or binary form and its associated documentation.

  2. Subject to the terms and conditions of this License Agreement, PSF hereby grants Licensee a nonexclusive, royalty-free, world-wide license to reproduce, analyze, test, perform and/or display publicly, prepare derivative works, distribute, and otherwise use Python 2.7.13 alone or in any derivative version, provided, however, that PSF's License Agreement and PSF's notice of copyright, i.e., "Copyright © 2001-2016 Python Software Foundation; All Rights

Reserved" are retained in Python 2.7.13 alone or in any derivative version prepared by Licensee.

  1. In the event Licensee prepares a derivative work that is based on or incorporates Python 2.7.13 or any part thereof, and wants to make the derivative work available to others as provided herein, then Licensee hereby agrees to include in any such work a brief summary of the changes made to Python 2.7.13.

  2. PSF is making Python 2.7.13 available to Licensee on an "AS IS" basis. PSF MAKES NO REPRESENTATIONS OR WARRANTIES, EXPRESS OR IMPLIED. BY WAY OF EXAMPLE, BUT NOT LIMITATION, PSF MAKES NO AND DISCLAIMS ANY REPRESENTATION OR WARRANTY OF MERCHANTABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE OR THAT THE USE OF PYTHON 2.7.13 WILL NOT INFRINGE ANY THIRD PARTY RIGHTS.

  3. PSF SHALL NOT BE LIABLE TO LICENSEE OR ANY OTHER USERS OF PYTHON 2.7.13 FOR ANY INCIDENTAL, SPECIAL, OR CONSEQUENTIAL DAMAGES OR LOSS AS A RESULT OF MODIFYING, DISTRIBUTING, OR OTHERWISE USING PYTHON 2.7.13, OR ANY DERIVATIVE THEREOF, EVEN IF ADVISED OF THE POSSIBILITY THEREOF.

  4. This License Agreement will automatically terminate upon a material breach of its terms and conditions.

  5. Nothing in this License Agreement shall be deemed to create any relationship of agency, partnership, or joint venture between PSF and Licensee. This License Agreement does not grant permission to use PSF trademarks or trade name in a trademark sense to endorse or promote products or services of Licensee, or any third party.

  6. By copying, installing or otherwise using Python 2.7.13, Licensee agrees to be bound by the terms and conditions of this License Agreement.

BEOPEN.COM LICENSE AGREEMENT FOR PYTHON 2.0 BEOPEN PYTHON OPEN SOURCE LICENSE AGREEMENT VERSION 1

  1. This LICENSE AGREEMENT is between BeOpen.com ("BeOpen"), having an office at 160 Saratoga Avenue, Santa Clara, CA 95051, and the Individual or Organization ("Licensee") accessing and otherwise using this software in source or binary

form and its associated documentation ("the Software").

  1. Subject to the terms and conditions of this BeOpen Python License Agreement, BeOpen hereby grants Licensee a non-exclusive, royalty-free, world-wide license to reproduce, analyze, test, perform and/or display publicly, prepare derivative works, distribute, and otherwise use the Software alone or in any derivative version, provided, however, that the BeOpen Python License is retained in the Software, alone or in any derivative version prepared by Licensee.

  2. BeOpen is making the Software available to Licensee on an "AS IS" basis. BEOPEN MAKES NO REPRESENTATIONS OR WARRANTIES, EXPRESS OR IMPLIED. BY WAY OF EXAMPLE, BUT NOT LIMITATION, BEOPEN MAKES NO AND DISCLAIMS ANY REPRESENTATION OR WARRANTY OF MERCHANTABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE OR THAT THE USE OF THE SOFTWARE WILL NOT INFRINGE ANY THIRD PARTY RIGHTS.

  3. BEOPEN SHALL NOT BE LIABLE TO LICENSEE OR ANY OTHER USERS OF THE SOFTWARE FOR ANY INCIDENTAL, SPECIAL, OR CONSEQUENTIAL DAMAGES OR LOSS AS A RESULT OF USING, MODIFYING OR DISTRIBUTING THE SOFTWARE, OR ANY DERIVATIVE THEREOF, EVEN IF ADVISED OF THE POSSIBILITY THEREOF.

  4. This License Agreement will automatically terminate upon a material breach of its terms and conditions.

  5. This License Agreement shall be governed by and interpreted in all respects by the law of the State of California, excluding conflict of law provisions. Nothing in this License Agreement shall be deemed to create any relationship of agency, partnership, or joint venture between BeOpen and Licensee. This License Agreement does not grant permission to use BeOpen trademarks or trade names in a trademark sense to endorse or promote products or services of Licensee, or any third party. As an exception, the "BeOpen Python" logos available at http://www.pythonlabs.com/logos.html may be used according to the permissions granted on that web page.

  6. By copying, installing or otherwise using the software, Licensee agrees to be bound by the terms and conditions of this License Agreement.

CNRI LICENSE AGREEMENT FOR PYTHON 1.6.1

  1. This LICENSE AGREEMENT is between the Corporation for National Research Initiatives, having an office at 1895 Preston White Drive, Reston, VA 20191 ("CNRI"), and the Individual or Organization ("Licensee") accessing and otherwise using Python 1.6.1 software in source or binary form and its associated documentation.
  2. Subject to the terms and conditions of this License Agreement, CNRI hereby grants Licensee a nonexclusive, royalty-free, world-wide license to reproduce, analyze, test, perform and/or display publicly, prepare derivative works, distribute, and otherwise use Python 1.6.1 alone or in any derivative version, provided, however, that CNRI's License Agreement and CNRI's notice of copyright, i.e., "Copyright © 1995-2001 Corporation for National Research Initiatives; All Rights Reserved" are retained in Python 1.6.1 alone or in any derivative version prepared by Licensee. Alternately, in lieu of CNRI's License Agreement, Licensee may substitute the following text (omitting the quotes): "Python 1.6.1 is made available subject to the terms and conditions in CNRI's License Agreement. This Agreement together with Python 1.6.1 may be located on the Internet using the following unique, persistent identifier (known as a handle): 1895.22/1013. This Agreement may also be obtained from a proxy server on the Internet using the following URL: http://hdl.handle.net/1895.22/1013."
  3. In the event Licensee prepares a derivative work that is based on or incorporates Python 1.6.1 or any part thereof, and wants to make the derivative work available to others as provided herein, then Licensee hereby agrees to include in any such work a brief summary of the changes made to Python 1.6.1.
  4. CNRI is making Python 1.6.1 available to Licensee on an "AS IS" basis. CNRI MAKES NO REPRESENTATIONS OR WARRANTIES, EXPRESS OR IMPLIED. BY WAY OF EXAMPLE, BUT NOT LIMITATION, CNRI MAKES NO AND DISCLAIMS ANY REPRESENTATION OR WARRANTY OF MERCHANTABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE OR THAT THE USE OF PYTHON 1.6.1 WILL NOT INFRINGE ANY THIRD PARTY RIGHTS.
  5. CNRI SHALL NOT BE LIABLE TO LICENSEE OR ANY OTHER USERS OF PYTHON 1.6.1 FOR ANY INCIDENTAL, SPECIAL, OR CONSEQUENTIAL DAMAGES OR LOSS AS A RESULT OF MODIFYING, DISTRIBUTING, OR OTHERWISE USING PYTHON 1.6.1, OR ANY DERIVATIVE THEREOF, EVEN IF ADVISED OF THE POSSIBILITY THEREOF.

  6. This License Agreement will automatically terminate upon a material breach of its terms and conditions.

  7. This License Agreement shall be governed by the federal intellectual property law of the United States, including without limitation the federal copyright law, and, to the extent such U.S. federal law does not apply, by the law of the Commonwealth of Virginia, excluding Virginia's conflict of law provisions. Notwithstanding the foregoing, with regard to derivative works based on Python 1.6.1 that incorporate non-separable material that was previously distributed under the GNU General Public License (GPL), the law of the Commonwealth of Virginia shall govern this License Agreement only as to issues arising under or with respect to Paragraphs 4, 5, and 7 of this License Agreement. Nothing in this License Agreement shall be deemed to create any relationship of agency, partnership, or joint venture between CNRI and Licensee. This License Agreement does not grant permission to use CNRI trademarks or trade name in a trademark sense to endorse or promote products or services of Licensee, or any third party.

  8. By clicking on the "ACCEPT" button where indicated, or by copying, installing or otherwise using Python 1.6.1, Licensee agrees to be bound by the terms and conditions of this License Agreement.

CWI LICENSE AGREEMENT FOR PYTHON 0.9.0 THROUGH 1.2

Copyright 1991 - 1995, Stichting Mathematisch Centrum Amsterdam, The

Netherlands. All rights reserved.

Permission to use, copy, modify, and distribute this software and its documentation for any purpose and without fee is hereby granted, provided that the above copyright notice appear in all copies and that both that copyright notice and this permission notice appear in supporting documentation, and that the name of Stichting Mathematisch Centrum or CWI not be used in advertising or publicity pertaining to distribution of the software without specific, written prior permission.

STICHTING MATHEMATISCH CENTRUM DISCLAIMS ALL WARRANTIES WITH REGARD TO THIS SOFTWARE, INCLUDING ALL IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS, IN NO EVENT SHALL STICHTING MATHEMATISCH CENTRUM BE LIABLE FOR ANY SPECIAL, INDIRECT OR CONSEQUENTIAL DAMAGES OR ANY DAMAGES WHATSOEVER RESULTING FROM LOSS OF USE,

DATA OR PROFITS, WHETHER IN AN ACTION OF CONTRACT, NEGLIGENCE OR OTHER TORTIOUS ACTION, ARISING OUT OF OR IN CONNECTION WITH THE USE OR PERFORMANCE OF THIS SOFTWARE.

Copyright 2011, Google Inc.

All rights reserved.

Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met:

* Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer.
* Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution.
* Neither the name of Google Inc. nor the names of its contributors may be used to endorse or promote products derived from this software without specific prior written permission.

THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND CONTRIBUTORS "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE COPYRIGHT OWNER OR CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

SZIP Copyright and License Notice

The SZIP Science Data Lossless Compression Program is Copyright (C) 2001

Science & Technology Corporation @ UNM. All rights released.

Copyright (C) 2003-2005 Lowell H. Miles and Jack A. Venbrux. Licensed to ICs, LLC, for distribution by the University of Illinois' National Center for Supercomputing Applications as a part of the HDF data storage and retrieval file format and software library products package. All rights reserved. Do not modify or use for other purposes.

SZIP implements an extended Rice adaptive lossless compression algorithm for sample data. The primary algorithm was developed by R. F. Rice at Jet Propulsion Laboratory.

SZIP embodies certain inventions patented by the National Aeronautics & Space Administration. United States Patent Nos. 5,448,642, 5,687,255, and 5,822,457 have been licensed to ICs, LLC, for distribution with the HDF data storage and retrieval file format and software library products. All rights reserved.

Revocable (in the event of breach by the user or if required by law), royalty-free, nonexclusive sublicense to use SZIP decompression software routines and underlying patents is hereby granted by ICs, LLC, to all users of and in conjunction with HDF data storage and retrieval file format and software library products.

Revocable (in the event of breach by the user or if required by law), royalty-free, nonexclusive sublicense to use SZIP compression software routines and underlying patents for non-commercial, scientific use only is hereby granted by ICs, LLC, to users of and in conjunction with HDF data storage and retrieval file format and software library products.

For commercial use license to SZIP compression software routines and underlying patents, please contact ICs, LLC, at

Address: ICs, LLC, 2040 Warren Wagon Road, P.O. Box 2236

McCall, ID 83638

Phone: (208) 315-2877. Fax: (208) 634-7720.

Email: support@ics4chips.com

The PHP License, version 3.01

Copyright (c) 1999 - 2019 The PHP Group. All rights reserved.

Redistribution and use in source and binary forms, with or without modification, is permitted provided that the following conditions are met:

  1. Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer.

  2. Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution.

  3. The name "PHP" must not be used to endorse or promote products derived from this software without prior written permission. For written permission, please contact group@php.net.

  4. Products derived from this software may not be called "PHP", nor may "PHP" appear in their name, without prior written permission from group@php.net. You may indicate that your software works in conjunction with PHP by saying "Foo for PHP" instead of calling it "PHP Foo" or "phpfoo"

  5. The PHP Group may publish revised and/or new versions of the license from time to time. Each version will be given a distinguishing version number. Once covered code has been published under a particular version of the license, you may always continue to use it under the terms of that version. You may also choose to use such covered code under the terms of any subsequent version of the license published by the PHP Group. No one other than the PHP Group has the right to modify the terms applicable to covered code created under this License.

  6. Redistributions of any form whatsoever must retain the following

acknowledgment:

"This product includes PHP software, freely available from

http://www.php.net/software/".

THIS SOFTWARE IS PROVIDED BY THE PHP DEVELOPMENT TEAM "AS IS" AND ANY EXPRESSED OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE PHP DEVELOPMENT TEAM OR ITS CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

This software consists of voluntary contributions made by many individuals on behalf of the PHP Group.

The PHP Group can be contacted via Email at group@php.net.

For more information on the PHP Group and the PHP project, please see http://www.php.net.

PHP includes the Zend Engine, freely available at http://www.zend.com.

Table of contents Click a title to access it
Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : PANASONIC

Model : AW-SF200Z

Category : Monitoring Software