EVS8224X - Audio/video converter Dahua Technology - Free user manual and instructions
Find the device manual for free EVS8224X Dahua Technology in PDF.
| Product Type | Audio/Video Converter |
| Brand | Dahua Technology |
| Model | EVS8224X |
| Dimensions (L x W x H) | 12.2 x 8.3 x 1.7 inches (310 x 210 x 43 mm) |
| Weight | 3.3 lbs (1.5 kg) |
| Power Supply | DC 12V, 2A |
| Power Consumption | ≤ 10W |
| Video Input | 1x BNC (CVBS), 1x HDMI |
| Video Output | 1x BNC (CVBS), 1x HDMI |
| Audio Input | 1x RCA (L/R), 1x HDMI |
| Audio Output | 1x RCA (L/R), 1x HDMI |
| Supported Video Formats | PAL, NTSC, 480i, 576i, 720p, 1080i, 1080p |
| Supported Audio Formats | PCM, MPEG-1, MPEG-2, AAC |
| Conversion Mode | Analog to Digital / Digital to Analog |
| Housing Material | Metal |
| Cooling | Passive (fanless) |
| Operating Temperature | 14°F to 122°F (-10°C to 50°C) |
| Storage Temperature | -4°F to 140°F (-20°C to 60°C) |
| Humidity | 10% to 90% (non-condensing) |
| Cleaning and Maintenance | Wipe with a dry, soft cloth. Do not use liquids or solvents. |
| Safety Certifications | CE, FCC, RoHS |
| Spare Parts Availability | Contact authorized Dahua service centers for spare parts. |
| Repair Service | Do not attempt to repair; consult qualified technicians. |
Frequently Asked Questions - EVS8224X Dahua Technology
User questions about EVS8224X Dahua Technology
0 question about this device. Answer the ones you know or ask your own.
Ask a new question about this device
Download the instructions for your Audio/video converter in PDF format for free! Find your manual EVS8224X - Dahua Technology and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. EVS8224X by Dahua Technology.
USER MANUAL EVS8224X Dahua Technology
Embedded Video Storage
User's Manual

natural_image
Abstract geometric composition with gray and red shapes (no text or symbols)Foreword
General
This manual introduces the installation, functions and operations of the embedded video storage server (hereinafter referred to as "the Device" or "EVS"). Read carefully before using the device, and keep the manual safe for future reference.
Models
| Series Models | |
| EVS71 Series | EVS7124S; EVS7136S; EVS7148S |
| EVS72 Series | EVS7224S; EVS7236S; EVS7248S; EVS7285S |
| EVS52 Series | EVS5224S; EVS5236S; EVS5248S |
| EVS51 Series | EVS5124S; EVS5136S; EVS5148S; EVS5160S |
| EVS50 Series | EVS5016S-V2; EVS5016S-R-V2 |
| EVS82 Series | EVS8224X, EVS8236X, EVS8248X |

In the name EVS71XXS, XX refers to HDD number (24, 36, or 48); S indicates that the Device is single-controller type.
Safety Instruction
The following signal words might appear in the manual.
| Signal Words Meaning | |
WARNING | Indicates a high potential hazard which, if not avoided, will result in death or serious injury. |
WARNING | Indicates a medium or low potential hazard which, if not avoided, could result in slight or moderate injury. |
CAUTION | Indicates a potential risk which, if not avoided, could result in property damage, data loss, reductions in performance, or unpredictable results. |
TIPS | Provides methods to help you solve a problem or save time. |
NOTE | Provides additional information as a supplement to the text. |
Revision History
| Version | Revision Content | Release Time |
| V5.1.0 | Added EVS82 series. | February 2023 |
| V5.0.0 | Update the interface pictures. | November.2022 |
| V4.1.1 | Updated Important Safeguards and Warnings. | June 2022 |
| V4.1.0 | Added EVS51 and EVS50 series. | April 2022 |
| V4.0.1 | Added particulate and gaseous contamination specifications. | February 2022 |
| V4.0.0 | Added one-click disarming.Added one-click diagnosis.Added the talk function.Added SSD health detection. | December 2021 |
| V3.1.1 | Deleted the strategy of shortcut RAID creation. | August 2021 |
| V3.1.0 | Added EVS7285S.Updated port description. | June 2021 |
| V3.0.0 | Updated some interfaces and functions. | April 2021 |
| V2.0.6 | Optimized storage and recording configurationAdded PTZ settingsAdded call detection and smoking detection | September 2020 |
| V2.0.2 | Added description of front and rear panels of the EVS52 Series and EVS72 Series. | April 2020 |
| V2.0.0 | Added functions such as AI reports, people counting and smart tracking.Brand-new UI, AI functions, general settings, and system configurations. | December 2019 |
| V1.0.0 | First release. | March 2019 |
Privacy Protection Notice
As the device user or data controller, you might collect the personal data of others such as their face, fingerprints, and license plate number. You need to be in compliance with your local privacy protection laws and regulations to protect the legitimate rights and interests of other people by implementing measures which include but are not limited: Providing clear and visible identification to inform people of the existence of the surveillance area and provide required contact information.
About the Manual
- The manual is for reference only. Slight differences might be found between the manual and the product.
- We are not liable for losses incurred due to operating the product in ways that are not in compliance with the manual.
- The manual will be updated according to the latest laws and regulations of related jurisdictions. For detailed information, see the paper user's manual, use our CD-ROM, scan the QR code or visit our official website. The manual is for reference only. Slight differences might be found between the electronic version and the paper version.
- All designs and software are subject to change without prior written notice. Product updates
might result in some differences appearing between the actual product and the manual. Please contact customer service for the latest program and supplementary documentation.
- There might be errors in the print or deviations in the description of the functions, operations and technical data. If there is any doubt or dispute, we reserve the right of final explanation.
- Upgrade the reader software or try other mainstream reader software if the manual (in PDF format) cannot be opened.
- All trademarks, registered trademarks and company names in the manual are properties of their respective owners.
- Please visit our website, contact the supplier or customer service if any problems occur while using the device.
- If there is any uncertainty or controversy, we reserve the right of final explanation.
Icons and Buttons
| Icon/Button Description | |
![]() | After you have entered password, click the icon, you can see the password is displayed in letters and number. Release mouse or move pointer to other places, the password is displayed in the form of black dots. |
![]() | Add icon. Click the icon, system can display the hidden APPLICATIONS window. You can view or open the applications. |
![]() | Help information. Point to the icon, device can display help information. |
![]() ![]() | Display or hide icon. Click the icon to display the hidden menu. Now the icon is shown as √/≫/▼. Click √/≫/▼ again to hide the menu items. |
![]() | Check the box. You can select multiple menu items at the same time.√ means selected. |
![]() | Check the box to select one menu item, ○ means selected. |
![]() | Drop-down box. Click the box to view the drop-down menu. |
![]() | Enable icon.: Disabled.: Enabled: The function cannot be enabled.: The function cannot be disabled. |
![]() | Click to clear all search criteria settings. |
![]() ![]() ![]() ![]() ![]() | Page switch./: Page up/page down./: Go to the first page or the last page. |
Filter icon. Click the icon to set filter criteria. | |
![]() | Select icon. Click the icon, the system displays a checkbox, so you can select multiple objects. |
![]() | Search column. Enter key words, click to search the corresponding information. |
Text column. Enter number, letter, symbol and so on. | |
![]() | Close button. Click the icon to close the window. |
Important Safeguards and Warnings
This section introduces content covering the proper handling of the Device, hazard prevention, and prevention of property damage. Read carefully before using the Device, and comply with the guidelines when using it.
Operation Requirements

WARNING
- This is a class A product. In a domestic environment this may cause radio interference in which case you may be required to take adequate measures.
- The Device is heavy and needs to be carried by several persons together to avoid personal injuries.

- Check whether the power supply is correct before use.
- Do not unplug the power cord on the side of the Device while the adapter is powered on.
- Operate the Device within the rated range of power input and output.
- Use the Device under allowed humidity and temperature conditions.
- Do not drop or splash liquid onto the Device, and make sure that there is no object filled with liquid on the Device to prevent liquid from flowing into it.
- Do not disassemble the Device without professional instruction.
- Your configurations will be lost after performing a factory reset. Please be advised.
- Do not restart, shut down or disconnect the power to the Device during an update.
Make sure the update file is correct because an incorrect file can result in a Device error occurring.
◇ The system cannot upgrade different types of AI modules at the same time.
- Do not frequently turn on/off the Device. Otherwise, the product life might be shortened.
- Back up important data on a regular basis when using the Device.
- Operating temperature: 0 °C to 45 °C (32 °F to 113 °F).
- Salt pray in the operating environment of the device might corrode its electronic components and cables. To ensure the normal operation of the device and prolong its service life, use the device in an indoor environment that is 3 kilometers away from the sea.
Installation Requirements

WARNING
- Do not connect the power adapter to the Device while the adapter is powered on.
- Strictly comply with the local electric safety code and standards. Make sure the ambient voltage is stable and meets the power supply requirements of the Device.
- Do not expose the battery to environments with extremely low air pressure, or extremely high or low temperatures. Also, it is strictly prohibited for the battery to be thrown into a fire or furnace, and to cut or put mechanical pressure on the battery. This is to avoid the risk of fire and explosion.
- Use the standard power adapter or cabinet power supply. We will assume no responsibility for
any injuries or damages caused by the use of a nonstandard power adapter.
!
- Do not place the Device in a place exposed to sunlight or near heat sources.
- Keep the Device away from dampness, dust, and soot.
- Put the Device in a well-ventilated place, and do not block its ventilation.
• Install the server on a stable surface to prevent it from falling.
- The power supply must conform to the requirements of ES1 in IEC 62368-1 standard and be no higher than PS2. Note that the power supply requirements are subject to the Device label.
- The Device is a class I electrical appliance. Make sure that the power supply of the Device is connected to a power socket with protective earthing.
- Use power cords that conform to your local requirements, and are rated specifications.
- Before connecting the power supply, make sure the input voltage matches the server power requirement.
- When installing the Device, make sure that the power plug and appliance coupler can be easily reached to cut off power.
• Install the server in an area that only professionals can access.
- Extra protection is necessary for the Device casing to reduce the transient voltage to the defined range.
- If you did not push the HDD box to the bottom, then do not close the handle to avoid damage to the HDD slot.
• Install the Device near a power socket for emergency disconnect.
- It is prohibited for non-professionals and unauthorized personnel to open the Device casing.
- Affix the Device securely to the building before use.
Maintenance Requirements

WARNING
- Make sure to use the same model when replacing the battery to avoid fire or explosion. Dispose the battery strictly according to the instructions on it.
- Power off the Device before maintenance.

- AI module does not support hot plug. If you need to install or replace the AI module, unplug the Device power cord first. Otherwise, it will lead to file damage on the AI module.
- The Device casing provides protection for internal components. Use a screwdriver to loosen the screws before detaching the casing. Make sure to put the casing back on and secure it in its original place before powering on and using the Device.
- It is prohibited for non-professionals and unauthorized personnel to open the Device casing.
- The appliance coupler is a disconnection Device. Keep it at a convenient angle when using it. Before repairing or performing maintenance on the Device, first disconnect the appliance coupler.
- Keep body parts away from fan blades.
Transportation Requirements

Transport the Device under allowed humidity and temperature conditions.
Storage Requirements

Store the Device under allowed humidity and temperature conditions.
Table of Contents
Foreword ....
Important Safeguards and Warnings....V
1 Overview....1
1.1 Introduction ...... 1
1.2 Front Panel....1
1.2.1 EVS7124S/EVS7136S/EVS5124S/EVS5136S/EVS7148S/EVS5148S/EVS5160S/EVS8224X/EVS8236X/EVS8248X....1
1.2.2 EVS7285S....3
1.2.3 EVS5016S-V2/EVS5016S-R-V2 4
1.3 Rear Panel....5
1.3.1 EVS7124S/EVS7136S/EVS7148S....5
1.3.2 EVS7285S....7
1.3.3 EVS5124S/EVS5136S/EVS5148S....8
1.3.4 EVS5016S-V2/EVS5016S-R-V2....10
1.3.5 EVS8224X/EVS8236X/EVS8248X....11
2 Installation and Powering Up....14
2.1 Installing HDD....14
2.1.1
EVS7124S/EVS7136S/EVS7148S/EVS7224S/EVS7236S/EVS7248S/EVS5224S/EVS5236S/EVS5248S/EVS5124S/EVS5136S/EVS5148S/EVS5160S/EVS8224X/EVS8236X/EVS8248X .... 14
2.1.2 EVS7285S....16
2.1.3 EVS5016S-V2/EVS5016S-R-V2....18
2.2 Installing Device to Cabinet....20
2.3 Powering Up....21
3 Initial Settings....23
3.1 Initializing the Device....23
3.1 Initializing the Device....23
3.1 Initializing the Device....23
3.1 Initializing the Device....23
3.1 Initializing the Device....23
3.1 Initializing the Device....23
3.1 Initializing the Device....23
3.1 Initializing the Device....23
3.1 Initializing the Device....23
3.1 Initializing the Device....23
3.2 Configuring IP Address....26
3.2 Configuring IP Address....26
3.2 Configuring IP Address....26
3.2 Configuring IP Address....26
3.2 Configuring IP Address....26
3.3 Login....27
3.3.1 Logging in to the PC Client ......27
3.3.2 Logging in to Local Interface 28
3.3.3 Logging in to Web Interface 29
3.4 Home Page....30
3.5 Configuring Remote Devices....31
3.5.1 Initializing Remote Devices 31
3.5.2 Adding Remote Devices .... 32
3.5.2.1 Quick Add....33
3.5.2.2 Manual Add....34
3.5.2.3 RTSP....36
3.5.2.4 Batch Add....37
4 AI Operations....40
4.1 Overview 40
4.2 Face Detection....41
4.2.1 Enabling the Smart Plan....41
4.2.2 Configuring Face Detection....41
4.2.3 Live View of Face Detection....42
4.2.3.1 Setting Attribute Display 42
4.2.3.2 Live View....43
4.2.4 Face Search 45
4.2.4.1 Searching by Attributes....45
4.2.4.2 Exporting Face Records....45
4.3 Face Comparison....46
4.3.1 Enabling the Smart Plan....46
4.3.2 Configuring Face Recognition....46
4.3.3 Live View of Face Comparison....47
4.3.3.1 Setting Attribute Display 47
4.3.3.2 Live View....49
4.3.4 Face Search 50
4.3.4.1 Searching by Attributes....50
4.3.4.2 Exporting Face Records....50
4.4 People Counting....51
4.4.1 Enabling the Smart Plan....51
4.4.2 Configuring People Counting....51
4.4.3 Configuring In Area No....52
4.4.4 Configuring Queuing Detection....53
4.4.5 Live View....54
4.4.6 Viewing AI Report....55
4.5 Video Metadata....55
4.5.1 Enabling the Smart Plan....55
4.5.2 Configuring Video Metadata....56
4.5.3 Live View of Video Metadata ....56
4.5.3.1 Setting Attribute Display....56
4.5.3.2 Live View....57
4.5.4 AI Search....58
4.5.4.1 Human Search ....58
4.5.4.2 Vehicle Search 60
4.5.4.3 Non-motor Vehicle Search....62
4.6 IVS....62
4.6.1 Enabling the Smart Plan....63
4.6.2 Configuring IVS....63
4.6.2.1 Global Configuration 63
4.6.2.2 Rule Configuration....63
4.6.3 Live View of IVS....65
4.6.3.1 Setting Attribute Display....66
4.6.3.2 Live View....67
4.6.4 IVS Search 68
4.7 Vehicle Recognition....69
4.7.1 Enabling the Smart Plan....69
4.7.2 Setting Vehicle Recognition 69
4.7.3 Live View of Vehicle Recognition....69
4.7.3.1 Setting Attribute Display....69
4.7.3.2 Live View....71
4.7.4 Searching for Detection Results....71
4.8 Crowd Distribution Map....71
4.8.1 Enabling the Smart Plan....71
4.8.2 Configuring Crowd Distribution Map....71
4.8.2.1 Global Configuration 71
4.8.2.2 Rule Configuration 72
4.8.3 Live View of Crowd Distribution 72
4.9 Call Alarm ....73
4.9.1 Enabling the Smart Plan....73
4.9.2 Configuring Call Alarm....73
4.9.3 Live View of Call Alarm....74
4.9.4 Call Alarm Search....74
4.10 Smoking Alarm....75
4.10.1 Enabling the Smart Plan....75
4.10.2 Configuring Smoking Alarm....75
4.10.3 Live View of Smoking Alarm....75
4.10.4 Smoking Alarm Search....76
5 General Operations 77
5.1 Live and Monitor ....77
5.1.1 View Management....78
5.1.1.1 View Group....79
5.1.1.1 Creating a View Group ....79
5.1.1.1.2 Managing View Groups....79
5.1.1.2 View....80
5.1.1.2.1 Creating a View 80
5.1.1.2.2 Editing a View....81
5.1.1.2.3 Opening a View....81
5.1.1.3 View Window....83
5.1.1.3.1 Taskbar....83
5.1.1.3.2 Shortcut Menu....85
5.1.1.3.3 Digital Zoom....86
5.1.1.3.4 Fisheye Dewarp....86
5.1.1.3.5 Smart Tracking 87
5.1.1.3.6 Thermal....87
5.1.1.3.7 Talk....88
5.1.2 Device Tree....88
5.1.3 PTZ....90
5.1.3.1 PTZ Menu Settings....91
5.1.3.2 Configuring PTZ Functions....92
5.1.3.2.1 Setting a Preset....92
5.1.3.2.2 Setting a Tour Group....93
5.1.3.2.3 Setting a Pattern 93
5.1.3.2.4 Setting a Scan....94
5.1.3.2.5 Enabling Auxiliary Functions....94
5.2 Recorded Files 95
5.2.1 Playing back Recorded Videos....95
5.2.2 Clipping a Video....98
5.2.3 Video Tag....99
5.2.4 Searching for Snapshots 100
5.2.5 Backing up Files....100
5.2.6 Locking Files....101
5.2.7 Watermark Verification....101
5.3 Alarm List....102
5.4 Display Management....102
5.4.1 Multiple-screen Control....102
5.4.2 Locking the Screen....103
5.5 System Messages....103
5.6 Background Task 103
5.7 Buzzer....104
5.8 Audio Management....104
6 System Configuration 105
6.1 Device Management 105
6.1.1 Viewing Remote Devices....105
6.1.2 Changing IP Address.... 106
6.1.2.1 Modifying IP of Unconnected Devices 106
6.1.2.2 Modifying IP of Connected Devices 108
6.1.3 Configuring Remote Devices....109
6.1.3.1 Configuring Attributes of Remote Devices 109
6.1.3.2 Managing Video Channels of Multichannel Devices 110
6.1.3.3 Configuring Video Parameters 110
6.1.3.4 Configuring OSD 112
6.1.3.5 Configuring Audio Parameters 113
6.1.4 Configuring Connection Information.... 114
6.1.5 Exporting Remote Devices.... 115
6.1.6 Importing Remote Devices....116
6.1.7 Connecting Remote Devices 116
6.1.8 Deleting Remote Devices.... 117
6.2 Network Management 117
6.2.1 Basic Network....117
6.2.1.1 Configuring IP Address 117
6.2.1.2 Port Aggregation 119
6.2.1.2.1 Binding NICs....120
6.2.1.2.2 Cancelling Binding NIC....122
6.2.1.3 Setting Port Number 122
6.2.2 Network Application....124
6.2.2.1 P2P....124
6.2.2.2 Auto Register 124
6.2.2.3 Email....125
6.2.2.4 Alarm Center 127
6.2.2.5 UPnP 128
6.2.2.6 SNMP....129
6.2.2.7 Multicast....131
6.2.2.8 DDNS....132
6.2.2.9 Routing Table....134
6.3 Storage Management....134
6.3.1 Storage Resource.... 135
6.3.1.1 Disks 135
6.3.1.1.1 Sleep Strategy 135
6.3.1.1.2 Viewing S.M.A.R.T.... 135
6.3.1.1.3 Formatting....136
6.3.1.1.4 Fixing the File System....136
6.3.2.3 Basic Storage Settings....150
6.3.2.3.1 Setting Storage Mode....150
6.3.2.3.2 Setting Automatic File Deletion 150
6.3.2.3.3 Setting Image Storage Strategy 151
6.3.2.4 Record Transfer....151
6.3.2.5 Video Retrieval....152
6.4 Event Management 154
6.4.1 Alarm Actions.... 154
6.4.1.1 Record.... 156
6.4.1.2 Buzzer 157
6.4.1.3 Log....157
6.4.1.4 Email.... 157
6.4.1.5 Preset....157
6.4.1.6 Picture Storage.... 158
6.4.1.7 Local Alarm Output....158
6.4.1.8 Remote Device Alarm Output....158
6.4.1.9 Access Control....159
6.4.1.10 Audio Linkage....159
6.4.1.11 Smart Tracking 160
6.4.1.12 Uploading Alarms 160
6.4.1.13 Remote Warning Light....160
6.4.2 Local Device....161
6.4.2.1 One-click Disarming....161
6.4.2.2 Abnormal Events....161
6.4.2.3 Offline Alarm....163
6.4.2.4 Viewing Smart Plans....164
6.4.3 Remote Device....165
6.4.3.1 Video Detection....165
6.4.3.1.1 Configuring Video Motion Detection 165
6.4.3.1.2 Tampering 167
6.4.3.2 Offline Alarm 167
6.4.3.3 IPC External Alarm....168
6.4.3.4 Thermal Alarm....169
6.5 Security Strategy 170
6.5.1 Security Status 170
6.5.2 System Service....172
6.5.2.1 Basic Services....172
6.5.2.2 Enabling HTTPS....173
6.5.3 Attack Defense....174
6.5.3.1 Firewall....174
6.5.3.2 Account Lockout....175
6.5.3.3 Anti-Dos Attack....175
6.5.3.4 Time Synchronization Permission....176
6.5.4 CA Certificate....177
6.5.4.1 Installing the Device Certificate 177
6.5.4.2 Installing the Trusted Certificate....179
6.5.5 Video Encryption....180
6.5.6 Security Warning....181
6.6 Account Management....181
6.6.1 Adding User Groups....181
6.6.2 Adding Device Users....183
6.6.3 Password Maintenance....185
6.6.3.1 Changing Password....185
6.6.3.1.1 Changing Password of the Current User 185
6.6.3.1.2 Changing Password of Other Users 185
6.6.3.2 Resetting the Password 185
6.6.3.2.1 Leaving Email Address and Security Questions 185
6.6.3.2.2 Resetting Password on Local Interface 186
6.6.3.2.3 Resetting Password on the Web Interface or PC Client 186
6.6.4 Adding ONVIF User 187
6.7 System Settings....188
6.7.1 Configuring Basic System Parameters....188
6.7.2 System Time....190
6.7.3 Schedule....191
6.8 Cluster Service....192
6.8.1 Creating a Cluster 193
6.8.2 Record Transfer....196
6.8.3 Viewing Cluster Log....197
6.9 Network Storage....198
6.9.1 Creating Storage Pool 198
6.9.2 Managing Share Account....199
6.9.3 Configuring Share Folder 199
6.9.4 Configuring Share Control....200
7 System Maintenance 201
7.1 Overview....201
7.2 System Information....201
7.2.1 Viewing Device Information 201
7.2.2 Viewing Legal Information....201
7.2.3 Viewing Storage Information....201
7.3 System Resources....202
7.4 Network Maintenance....202
7.4.1 Online User....202
7.4.2 Network Test....203
7.5 Disk Maintenance....204
7.5.1 S.M.A.R.T Detection....204
7.5.2 System Disk Health Detection....204
7.5.3 Firmware Update....204
7.5.4 Health Monitoring....205
7.6 Logs 205
7.6.1 Log Classification....205
7.6.2 Log Search 205
7.7 Intelligent Diagnosis....206
7.7.1 One-click Export......206
7.7.2 Run Log 207
7.7.3 One-click Diagnosis....207
7.8 Maintenance Manager 207
7.8.1 Update....207
7.8.1.1 Updating the Device....207
7.8.1.2 Updating Cameras....208
7.8.2 Default....208
7.8.3 Automatic Maintenance 209
7.8.4 Backing up Configurations ...... 210
8 PC Client 211
8.1 Page Description....211
8.2 History Record....211
8.3 Viewing Downloads....211
8.4 Configuring the Client Settings....212
8.5 Viewing the Client Version 212
9 Log Out, Restart, Shut Down, Lock 213
Appendix 1 Glossary....214
Appendix 2 Mouse and Keyboard Operations ...... 216
Appendix 2.1 Mouse Operations ...... 216
Appendix 2.2 Virtual Keyboard....217
Appendix 3 RAID 219
Appendix 4 HDD Capacity Calculation....221
Appendix 5 Particulate and Gaseous Contamination Specifications ....222
Appendix 5.1 Particulate Contamination Specifications....222
Appendix 5.2 Gaseous Contamination Specifications ...... 222
Appendix 6 Cybersecurity Recommendations....224
1 Overview
1.1 Introduction
The Device is designed for the management, storage and application of high-definition video data. It uses Linux operation system and professional customized hardware platform, and it is configured with multiple Hard Disk Drive (HDD) management system, front-end HD device management system, HD video analysis system and large capacity video storage system.
It adopts high-traffic data network transmission & forward technology and multi-channel video decoding & display technology, and realizes intelligent management, secure storage, fast forwarding and HD decoding of large capacity and multi-channel HD video data.
The Device provides standard network file sharing service and offers integrated network storage solution. It provides centralized storage solutions with large capacity, high scalability and high security for all kinds of video monitoring systems.
1.2 Front Panel
1.2.1
EVS7124S/EVS7136S/EVS5124S/EVS5136S/EVS7148S/EVS5148S/EVS5160S/EVS8224X/EVS8236X/EVS8248X
Figure 1-1 EVS7124S/EVS7136S/EVS5124S/EVS5136S/EVS8224X/EVS8236X

Figure 1-2 EVS7148S/EVS5148S/EVS5160S/EVS8248X

Table 1-1 Front panel description
| No. Name | Description | |
| 1 Power button | Turns on or off the Device.If the Device is off, press this button to turn the Device on.To turn off the Device, press and hold this button for 5 seconds. | |
| 2 HDD status indicator | The light is off when the HDD is in normal operation.The red light keeps on if no HDD, HDD error or insufficient HDD space. | |
| 3 Alarm status indicator | The light is off when the Device is running properly.The red light keeps on when the power, temperature or fan is abnormal. | |
| 4 | Network status indicator | The red light keeps on if there is a network failure, IP conflict or MAC conflict. |
| 5 | USB ports | Connects to external USB devices, such as flash drive. |
1.2.2 EVS7285S
Figure 1-3 Front panel

Table 1-2 Front panel description
| No. Name Description | ||
| 1 | HDD status indicator light | The light is off when no HDD is installed.The light glows when there is no read and write operation on the installed HDD.The light flashes when there is read and write operation on the installed HDD. |
| 2 Power button | Starts or shut down the Device.If the Device is off, press this button to turn the Device on.To turn off the Device, press and hold this button for five seconds. | |
| 3 | Network status indicator light | The light is out when the Device accesses network properly.The red light keeps on if there is a network failure, IP conflict or MAC conflict. |
| 4 | HDD alarm indicator light | The light is off when the HDD is in normal operation.The red light keeps on when there is no HDD, HDD error or insufficient HDD space. |
| 5 | Alarm status indicator light | The light is off when the Device is running properly.The red light keeps on when the power, temperature or fan is abnormal. |
1.2.3 EVS5016S-V2/EVS5016S-R-V2
Figure 1-4 Front panel

Table 1-3 Front panel description
| No. | Name | Description | |
| 1 | Power button | Turns on or off the device.If the Device is off, press this button to turn the Device on.To turn off the Device, press and hold this button for five seconds. | |
| 2 | HDD status | indicator | The light is off when the HDD is in normal operation.The light is solid red in case of no HDD, HDD error or insufficient HDD space. |
| 3 | Alarm status | indicator | The light is off when the Device works normally.The light is solid red when power error, abnormal temperature and fan error occur. |
| 4 | Network status indicator | The light is solid red if there is network failure, IP conflict or MAC conflict. |
1.3 Rear Panel
1.3.1 EVS7124S/EVS7136S/EVS7148S
Figure 1-5 EVS7124S

Figure 1-6 EVS7136S

Figure 1-7 EVS7148S

Table 1-4 Rear panel description
| No. | Port | Description |
| 1 Power module | Connects to AC power supply. Contains fans for case cooling. | |
| 2 | RS-232 | Used to debug general serial ports, configure IP address and transmit transparent serial data. |
| WEB | Gigabit management port. Can be used as data port. | |
| SAS HD | Connects the IN interface of the expansion cabinet. | |
| eSATA | Connects to external storage devices. | |
| USB 3.0 | Connects the mouse or other USB storage devices. | |
| EX-1–EX-4/1–4 | Gigabit Ethernet ports, can be used to transfer data. | |
| HDMI | Outputs high definition video data and multi-channel audio data to external displays.The port is for system installation and after-sales maintenance only. | |
| PCI-E | High-speed expansion port, connects to components with X4 or X8 plug. | |
1.3.2 EVS7285S
Figure 1-8 Rear panel

Table 1-5 Rear panel description
| No. Port Description | ||
| 1 Power module | Connects to AC power supply. Contains fans for case cooling. | |
| 2 Fans Used for device cooling. | ||
| 3 | RS-232 | Used to debug general serial ports, configure IP address and transmit transparent serial data. |
| WEB | Gigabit management port which can be used as data port. | |
| RUN | The indicator keeps on when the Device is running. | |
| eSATA | Connects to external storage devices. | |
| USB 3.0 | Connects the mouse or other USB storage devices. | |
| EX-1–EX-4/1–4 | Gigabit data port for data transmission. | |
| PCI-E | High-speed expansion port, connects to components with X8 plug. | |
1.3.3 EVS5124S/EVS5136S/EVS5148S
Figure 1-9 EVS5124S

Figure 1-10 EVS5136S

Figure 1-11 EVS5148S

Figure 1-12 EVS5160S

Table 1-6 Rear panel description
| No. Port Description | ||
| 1 | Power module | Connects to AC power supply. Contains fans for case cooling. |
| 2 | RS-232 | Used to debug general serial ports, configure IP address and transmit transparent serial data. |
| WEB | Gigabit management port. Can be used as data port. | |
| SAS HD Connects the IN interface of the expansion cabinet.[DSYG]The port is optionally available on select models. | ||
| eSATA Connects to external storage devices. | ||
| USB 3.0 Connects the mouse or other USB storage devices. | ||
| HDMI Outputs high definition video data and multi-channel audio data to external displays.[BAT2]The port is for system installation and after-sales maintenance only. | ||
| PCI-E High-speed expansion port, connects to components with X2 or X4 plug. | ||
1.3.4 EVS5016S-V2/EVS5016S-R-V2
Figure 1-13 Rear panel (redundant power)

Figure 1-14 Rear panel (single power)

Table 1-7 Rear panel description
| No. Port Description | ||
| 1 Power module | Connects to AC power supply. Contains fans for case cooling. | |
| 2 | RS-232 | Used to debug general serial ports, configure IP address and transmit transparent serial data. |
| VGA | VGA video output port. Outputs analog video signal. It can connect to the monitor to view analog video.The port is for system installation and after-sales maintenance only. | |
| eSATA | Connects to external storage devices. | |
| USB 3.0 | Connects the mouse or other USB storage devices. | |
| HDMI | Outputs high definition video data and multi-channel audio data to external displays.The port is for system installation and after-sales maintenance only. | |
| LAN1, LAN 2 | Gigabit network port for data transmission. | |
1.3.5 EVS8224X/EVS8236X/EVS8248X
Figure 1-15 EVS8224X

Figure 1-16 EVS8236X

Figure 1-17 EVS8248X

Table 1-8 Rear panel description
| No. Port Description | ||
| 1 Power module | Connects to AC power supply. Contains fans for case cooling. | |
| 2 | RS-232 | Used to debug general serial ports, configure IP address and transmit transparent serial data. |
| WEB | Gigabit management port. Can be used as data port. | |
| eSATA | Connects to external storage devices. | |
| USB 3.0 | Connects the mouse or other USB storage devices. | |
| EX-1–EX-4/1–4 | Gigabit Ethernet ports, can be used to transfer data. | |
| VGA | VGA video output port. Outputs analog video signal. It can connect to the monitor to view analog video.The port is for system installation and after-sales maintenance only. | |
| PCI-E | High-speed expansion port which connects to components with X4 plug. |
2 Installation and Powering Up
2.1 Installing HDD
2.1.1
EVS7124S/EVS7136S/EVS7148S/EVS7224S/EVS7236S/EVS7248S/EVS5224S/EVS5236S/EVS5248S/EVS5124S/EVS5136S/EVS5148S/EVS5160S/EVS8224X/EVS8236X/EVS8248X
The HDD is not installed by default on factory delivery. You need to install it by yourself.

Some devices are heavy and should be carried jointly by several persons to avoid injury.
Procedure
Step 1 Press the red button on the disk tray to unlock the handle.

Step 2 Pull out the empty disk tray.
Figure 2-2 Disk tray

natural_image
Metallic internal panel with rectangular cutouts and hexagonal base (no text or symbols visible)Step 3 Put the disk into the disk tray and fasten the screws at the bottom of the tray.
Figure 2-3 Fasten the screws

Step 4 Insert the disk tray into the HDD slot, push it to the bottom and lock the handle.

To avoid any damage to the slot, do not lock the handle until the disk tray has been pushed to the bottom.
2.1.2 EVS7285S
Procedure
Step 1 Turn the lock on the cover with a screwdriver and then lift the cover open.
Figure 2-4 Remove the cover

Step 2 Take out the disk tray.
Figure 2-5 Take out disk tray

natural_image
Illustration of a mechanical device with an inset showing a device being lifted by an arrow (no text or symbols present)Step 3 Remove the fake disk.
Figure 2-6 Remove fake disk

natural_image
Diagram of a multi-compartment storage unit with internal compartments and an arrow indicating rotation (no text or symbols)Step 4 Put the real disk into the disk tray.
Figure 2-7 Install real disk

natural_image
Diagram of a mechanical component with an arrow indicating rotational motion (no text or symbols)Step 5 Re-insert the disk tray into the device.
Figure 2-8 Re-insert disk tray

natural_image
Diagram of a device with a magnified inset showing a screen and a circular arrow (no text or symbols)Step 6 Re-attach the cover, and then turn the lock.
Figure 2-9 Re-attach the cover

2.1.3 EVS5016S-V2/EVS5016S-R-V2
Procedure
Step 1 Press the red button on the HDD box in the front panel and unlock the handle.
Figure 2-10 Open the handle

natural_image
Close-up of a mechanical device with a red button and handle, no visible text or symbolsStep 2 Pull out to take the empty HDD box.
Figure 2-11 HDD box

natural_image
Metallic mechanical component with mounting holes and a red-handled handle (no text or symbols visible)Step 3 Put the HDD into the disk box and fasten the screws on both sides of the box.
Figure 2-12 Fasten the screws


To avoid any damage to the slot, do not close the handle if the HDD box has not been pushed to the bottom.
Step 4 Insert the HDD box into the HDD slot, push it to the bottom, and then lock the handle.
2.2 Installing Device to Cabinet
For EVS7285S, the Device should be installed to cabinet.

- The hangers are used to secure the Device and cannot bear weight. When installing the Device to cabinet, make sure a bracket is placed to support the Device.
- The following figures are for reference only and might differ from the actual product.
Procedure
Step 1 Press the tab to take out the inner tracks and then press in the direction indicated by the arrow to slide the intermediate track back.
Figure 2-13 Take out inner track

Step 2 Install and secure the inner tracks on the sides of the Device.
Figure 2-14 Install inner track

Step 3 Install the slide rail onto the cabinet square hole through screws.
Figure 2-15 Install slide rail

Step 4 When pushing the Device into the cabinet, slide to remove the handle, and then press the tab.
Figure 2-16 Push device into cabinet

Step 5 Tighten the screws.
Figure 2-17 Tighten the screws

natural_image
Isometric line drawing of a rectangular electronic device with mounting brackets and connectors (no text or symbols)2.3 Powering Up
Prerequisites
Properly connect the cables before powering up the Device and check against the following items:
- Make sure that all power lines are connected correctly.
- Check whether the supplied power voltage complies with device requirements.
- Check whether the network cables and SAS cables are connected correctly.
Background Information
This section uses EVS7124S as an example, and slight difference might be found in the actual. Press the power button on the front panel.
Figure 2-18 Front panel

natural_image
Technical line drawing of a multi-level heating unit with labeled components (no text or symbols beyond labels)See Table 1-1 to check whether the indicators are normally displayed.
- When the indicators are normal, the Device is powered up successfully.
- If the indicators are abnormal, remove the abnormalities according to the corresponding notes and power up the Device again.
3 Initial Settings
When using the Device for the first time, initialize the device, and set basic information and functions first.
3.1 Initializing the Device
If it is your first time to use the device after purchasing or after restoring factory defaults, set a login password of admin (system default user). At the same time, you can set a proper password protection method.

This section uses remote initialization on the web interface as an example.
Procedure
Step 1 Open the browser, enter IP address, and then press the Enter key.

The default IP addresses of network port 1 to network port 4 are 192.168.1.108 to 192.168.4.108. Enter the corresponding IP address of the actually connected network port.
Step 2 Set the language and region, select the video standard that is used in your region, and then click Device Initialization.
- PAL is mainly used in China, Middle East and Europe.
- NTSC is mainly used in Japan, United States of America, Canada and Mexico.
Figure 3-1 Region

Step 3 Configure the time parameters, and then click Next.
Figure 3-2 Time

Table 3-1 Time parameters description
| Parameter Description | |
| Time Zone Select the time zone of the Device. | |
| Time | Set system date and time manually or by synchronizing with NTP server time.Manual Settings:Select date and time from the calendar.NTP:Select NTP, enter the IP address or domain of the NTP server, and then set the automatic synchronization interval. The time of the Device will be automatically synchronized with the server time. |
Step 4 Set admin login password, and then click Next.
Figure 3-3 Password

Table 3-2 Description of password parameters
| Parameter Description | |
| Username The default username is admin. | |
| Password | Set admin login password, and then confirm the password. Click to view the password requirement. |
| Confirm Password | |
Click
to view the password requirement.
Step 5 Configure password protection settings.
You can use the linked email address or answer the security questions to reset admin password. See "6.6.3.2 Resetting the Password" for detailed information.

- Click to disable the email address or security questions.
- If the email is not set, you can only reset the password on the local interface.
Figure 3-4 Password protection

Table 3-3 Password protection
| Password Protection Mode | Description |
| Email Address | Leave an email address for resetting password. |
| Security Question | Set security questions and corresponding answers. You can reset the password by answering the security questions. |
Step 6 Click OK.
The Device is initialized. You can click Quick Config to configure quick settings.
3.2 Configuring IP Address
Configure the IP address and DNS server information of the Device according to network planning.

Make sure that at least one Ethernet port has been connected to the network before you set IP address.
Procedure
Step 1 On the page that prompts you initialization succeeded, click Quick Config.
Step 2 Configure the IP address.
1) Click ☑ of the corresponding NIC.
Figure 3-5 Edit Ethernet network

2) Set parameters.
Table 3-4 NIC parameters description
| Parameter Description | |
| Rate (Mbps) | The maximum network transmission speed that the current NIC supports. |
| Type Select IPv4 or IPv6. | |
| Mode | DHCP: When there is a DHCP server on the network, you can enable DHCP. The system allocates a dynamic IP address to the Device. There is no need to set IP address manually.Static: You need to enter the IP address, subnet mask and gateway. |
| Test | Test whether the IP address is valid. |
| MTU | Set NIC MTU value. The default setup is 1500 bytes.We recommend you check the MTU value of the gateway first and then set the MTU value of the Device equal to or smaller than the gateway value, which helps to reduce the packets slightly and enhance network transmission efficiency. Please be advised that changing MTU value might result in NIC restart, network offline and affect current running operation. |
3) Click OK.
Step 3 Set DNS server information.

This step is compulsive if you want to use domain service.
- Select DHCP so that the Device can automatically get the IP address of the DNS server on the network.
- Select Static and then enter the preferred and alternate DNS addresses.
Step 4 Set the default NIC.

Make sure that the default NIC is online.
Step 5 Click Next.
3.3 Login
You can operate the device by using the local interface, web interface and PC client.
- Monitor and mouse are needed for local operation.
- You can remotely access the Device through the web interface and PC client. We recommend you use the PC client.

After initializing the Device, you have logged in by default. Now you can configure system settings and operate.
3.3.1 Logging in to the PC Client
Log in to the PC client for system configuration and operation.
Procedure
Step 1 Download the PC client.
1) Open the browser, enter IP address, and then press the Enter key.
2) Click Download PC Client to download the installation package.
Step 2 Double-click the installation package, and then follow the on-screen instructions to install the PC client.
Step 3 Open the PC client, enter the IP address of the Device, and then press Enter.

When the theme of your computer is not Aero, the system will prompt you to switch the theme. To ensure video smoothness, switch your computer to Areo theme.
Step 4 Enter the username and password, select a login type, and then click Login.

- The default administrator username is admin. The password of the admin account is what you set during initialization. For your device safety, change the password of the admin account regularly and keep it safe.
- If you forget the password of the admin account, click Forgot password to reset. See "6.6.3.2 Resetting the Password" for detailed information.
Figure 3-6 Login (PC client)

3.3.2 Logging in to Local Interface
Prerequisites
Ensure that the Device is connected with display, mouse and keyboard.
Procedure
Step 1 Turn on the Device.
Step 2 Enter username and password.

- The default administrator username is admin. The password of the admin account is what you set during initialization. For your device safety, change the password of the admin account regularly and keep it safe.
- Point to i to view the password prompt information. It is to help you remember password.
- If you forget the password of the admin account, click Forgot password to reset. For details, see "6.6.3.2 Resetting the Password".
Step 3 Click Login.
3.3.3 Logging in to Web Interface
You can use the general browser such as Google Chrome, Firefox to access the web interface to manage the Device remotely, operate and maintain the system.

When you are using a general browser to access the web interface, some functions might be not available. We recommend you use the PC client.
Procedure
Step 1 Open the browser, enter IP address, and then press Enter.
Step 2 Enter username and password.

- The default administrator username is admin. The password of the admin account is what you set during initialization. For your device safety, change the password of the admin account regularly and keep it safe.
- If you forget the password of the admin account, click Forgot password to reset. See "6.6.3.2 Resetting the Password" for detailed information.
Step 3 Select the login type, and then click Login.
Figure 3-7 Login (web)

3.4 Home Page
Figure 3-8 Home page


When you log in to the local interface, you can click

to control the screens.
Table 3-5 Home page description
| No. | Name Description | |
| 1 | Home page | Go back to the home page. |
| 2 Task Column | Displays enabled application icon. Point to the app and then click to close the app.The maintain function is enabled by default | |
| 3 | Function tiles | Click each tile to access the corresponding function. |
| 4 Time Displays the current date and time. | ||
| 5 | Event information | View event information. |
| 6 | System messages | View system error messages, warnings, and notifications. |
| 7 | One-click Diagnosis | One-click diagnosis of device configuration and status to help users use the device better. |
| 8 | Buzzer | View buzzer messages. |
| 9 | Background task | View the tasks running in the background. |
| 10 | System configuration | You can access the configuration of accounts, network, events, and more by clicking the icon or from the configuration list on the home page. |
| 11 Login user | Change the password, lock the user, log out, restart or shut down the Device. | |
3.5 Configuring Remote Devices
Register remote devices to the system. You can view the live video from the remote device, change remote device settings, and so on.
3.5.1 Initializing Remote Devices
After you initialize the remote devices, you can change their login passwords and IP addresses. Remote devices can be connected to the Device only after being initialized.
Procedure
Step 1 Log in to the PC client.
Step 2 Click ☐ on the upper-right corner of the page and then click Camera.
You can also click Camera from the configuration list on the home page.
Step 3 Under the Camera tab, click Add.
You can also click Add under the device tree.
Figure 3-9 Camera

Step 4 Under the Quick Add tab, click Start Search.
The search results are displayed.

To filter the search results, you can click

Step 5 Select an uninitialized remote device and then click Initialize.

Click next to Initialization Status and then select Uninitialized to show uninitialized remote devices only.
Step 6 Set the password and linked email address for the remote device.

You can skip this step if you keep Using current device password and password protection information enabled as default. The remote device automatically uses the current admin password and email address of the Device.
1) To manually configure the password, disable Using current device password and password protection information.
2) Enter and confirm the password, and then click Next.
3) Set an email address, and then click Next. You can use the email address to reset the password of the remote device if you forget
the password.
Step 7 Set the IP address of the remote device and then click Next.
- When there is a DHCP server on the network, select DHCP, and the remote device gets dynamic IP address automatically. You do not need to enter IP address, subnet mask and gateway.
- If you select Static, enter static IP address, subnet mask, default gateway and incremental value.

- Enter incremental value only when you want to change IP addresses of several devices at the same time. The system will allocate IP address one by one with the fourth part of the IP address increasing by the incremental value.
- If an IP conflict occurs when you change the static IP address, the system will notify you of the issue. When an IP conflict happens when you are changing IP addresses in batches, the system automatically skips the conflicted IP and begins the allocation according to the incremental value.
Step 8 Click Add or OK
- Click Add: The system completes initializing the remote device and then adds the remote device to the Device.
- Click OK: The system completes initializing remote device without adding the remote device to the Device.
3.5.2 Adding Remote Devices
You can add remote devices to the Device in any of the following ways.
Table 3-6 Methods of adding remote devices
| Method Description | |
| Quick Add | Search for the remote devices on the same network and then filter the search results to register the remote devices that you need.We recommend this method if you do not know the exact IP address of the remote device. |
| Manual Add | Enter the IP address, username and password of the remote device.We recommend this method when you want to add only a few remote devices and you know their IP addresses, usernames, and passwords. |
| RTSP | Add remote devices through RTSP.We recommend this method when you add stream media devices. |
| Batch Import | Fill in information on remote devices in the template, and then import the template to add the remote devices.We recommend this method when you want to add a lot of remote devices whose IP addresses, usernames and password vary with each other. |
3.5.2.1 Quick Add
Procedure
Step 1 Under the Quick Add tab, click Start Search.
You can click 📋 to filter the search results.
Figure 3-10 Search results

Table 3-7 Description of search results
| Parameter Description | |
| Start Search | Click Start Search to search for remote devices again. Click Stop Search to stop search. |
| Connection Password | Click Connection Password to set the username and password for the remote devices.If you do not set the username and password for the remote device, the system will try to add the remote device by using the username and password of the Device. |
| Initialize | Select uninitialized remote devices, and then click Initialize to start initialization. |
| Modify IP | Select one or more remote devices, and then click Modify IP to change their IP addresses. |
| Initialization Status | Click and then select Initialized or Uninitialized to show initialized or uninitialized remote devices only. |
| Operation | Click to configure parameters of the remote device.Click to view the real-time video from the remote device. You can view the live video only when the admin password of the remote device is admin, or the same as the admin password of the Device. |
| Bandwidth | Displays the remaining and total bandwidth. You cannot add more remote devices when the bandwidth runs out. |
Step 2 Select one or more remote devices, and then click OK.

- During the adding process, click Cancel to cancel adding the remote device.
- If a remote device is in exception due to network disconnection or other reasons, it can still be added. It comes online after the exception is resolved.
Step 3 Click Add more or Complete.
- Click Add more, the Device goes back to the Quick Add window and you can add more remote devices.
- Click Completeif you do not want to add more remote devices at the moment. The Device goes back to the Camera tab where you can view the added remote devices.
3.5.2.2 Manual Add
Procedure
Step 1 Log in to the PC client.
Step 2 Click 📋 on the upper-right corner of the page and then click Camera.
You can also click Camera from the configuration list on the home page.
Step 3 Under the Camera tab, click Add.
You can also click Add under the device tree.
Figure 3-11 Camera

Step 4 Under the Manual Add tab, click Add Device.
Step 5 Set parameters and then click OK.
Figure 3-12 Remote device setting

Table 3-8 Parameters of adding remote device
| Parameters Description | |
| Channel No. | Select a channel number for the remote device on EVS.If you selectAuto Allocation,EVS will provide a channel number automatically. |
| Manufacturer | Select the connection protocol of the remote device.Privateis selected by default. |
| IP Address | Enter the IP address of the remote device. |
| Device No. | Enter the unique device No. allocated by the server for the remote device. _When Manufacturer is Register, you need to configure this parameter. |
| RTSP Mode | SelectSelf-adaptive or Custom. _When Manufacturer is Onvif or Onvifs, you need to configure this parameter. |
| RTSP Port | When you selectCustomfor RTSP Mode, enter the RTSP port number. The default port number is 554. The value ranges from 1 through 65535. |
| HTTP Port | Enter the HTTP port number. The default port number is 80. The value ranges from 1 through 65535.After changing the HTTP port number, you need to add the HTTP port number to the IP address in the address bar of the browser so that you can log in to the web interface of the remote device. |
| HTTPS Port | Enter the HTTP port number. The default port number is 80. The value ranges from 1 through 65535.When Manufacturer is Onvifs, you need to configure this parameter. |
| Username | Enter the username and password of the remote device. |
| Password | |
| TCP Port | Enter the TCP port number of the remote device.When Manufacturer is Private, you need to configure this parameter. |
| Connection Type | Select a connection type from Self-adaptive, TCP, UDP and Multicast.The connection types available might differ depending on the manufacturer. |
| Remote CH No. | When the remote device has multiple channels, you can select one or more channels of the remote device that you want to add to the Device.Click Connect to get the total number of channels of the remote channel.Enter the range of channels that you need, and then click Select to select all the channels in the range. You can click 1 2 to select or cancel the selection of specific channels.Click OK |
| Channel No. | |
Step 6 Select the remote device and then click OK.
Step 7 Click Add more or Complete.
- Click Add more, the Device goes back to the Quick Add window and you can add more remote devices.
- Click Complete if you do not want to add more remote devices at the moment. The Device goes back to the Camera tab where you can view the added remote devices.
3.5.2.3 RTSP
Procedure
Step 1 Log in to the PC client.
Step 2 Click 📋 on the upper-right corner of the page and then click Camera.
You can also click Camera from the configuration list on the home page.
Step 3 Under the Camera tab, click Add.
You can also click Add under the device tree.
Figure 3-13 Camera

Step 4 Under the RTSP tab, enter the RTSP address.
The RTSP address format is rtsp://
address >:
rtsp://admin:admin@192.168.20.25:554/cam/realmonitor?channel=1&subtype=0.
- Username: Username of the remote device.
- Password: Password of the remote device.
- IP address: IP address of the remote device.
- Port: 554 by default.
- Channel: The channel number of the stream media device to be added.
- Subtype: Stream type. 0 for main stream, and 1 for sub stream.
Figure 3-14 RTSP

Step 5 Select a channel No.
Step 6 Click OK.
3.5.2.4 Batch Add
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner of the page and then click Camera.
You can also click Camera from the configuration list on the home page.
Step 3 Under the Camera tab, click Add.
You can also click Add under the device tree.
Figure 3-15 Camera

Step 4 Under the Batch Import tab, click Download Template to download the template.

- On the PC client, click at the top of the client, select Download to view the storage path.
- On the local interface, you can select the file storage path.
- On the web interface, files are saved to the default downloading path of the browser.
Figure 3-16 Import CSV file

Step 5 Fill in and save the template file.
Step 6 Import the template.
1) Under the Batch Import tab, click Browse to select the file that you have filled in.
2) Select an import mode.
- Overwrite: The system removes the added remote devices before importing new devices.

If you select Overwrite, all the existing devices will be deleted.
- Add: The system imports remote devices without deleting the existing ones.
3) Click Import. You can view the imported information on the remote devices.

If the information on remote devices is not filled in completely, you can improve it after importing the template.
Step 7 Select one or more remote devices, and then click OK.

- During the adding process, click Cancel to cancel adding the remote device.
- If a remote device is in exception due to network disconnection or other reasons, it can still be added. It comes online after the exception is resolved.
Step 8 Click Add more or Complete.
- Click Add more, the Device goes back to the Quick Add window and you can add more remote devices.
- Click Complete if you do not want to add more remote devices at the moment. The Device goes back to the Camera tab where you can view the added remote devices.
4 AI Operations
The device supports AI by camera. When configuring an intelligent detection, if you select AI by camera, the intelligent analysis job is completed on the camera, and the device just receives and processes the results.
This chapter introduces how to configure the AI functions respectively.

- The AI functions might vary depending on the device function capability.
- When AI by camera is enabled, complete AI detection configuration at remote device. See remote device user's manual.
- The AI by Camera tab does not appear if the current camera does not support this function.
- Some AI functions are mutually exclusive, and the unified channel does not allow mutually exclusive AI functions to be enabled at the same time.
4.1 Overview
Viewing Event Enabling Status
Log in to the PC client, select Event from the configuration list on the home page, select the root node on the device tree, and then click Overview. You can view the events enabled on the Device.
indicates that AI by Camera is enabled.
Figure 4-1 Overview

AI Events by Recorder or Camera
Table 4-1 AI Events by Recorder or Camera
| AI Event | AI by Camera | AI by Recorder |
| Face Detection | Yes | No |
| Face Comparison Yes No | ||
| People Counting Yes No | ||
| Video Metadata | Yes | No |
| IVS Yes No | ||
| Crowd Distribution | Yes | No |
| Call Alarm Yes No | ||
| Smoking Alarm Yes No | ||
| ANPR Yes No |

Click e after the video detection device to go the Web page of the corresponding device quickly.
4.2 Face Detection
An alarm is triggered when human faces are detected within the detection zone.
4.2.1 Enabling the Smart Plan
To use AI by Camera, you need to enable the smart plan first.

- The Device automatically shows the smart functions available on the connected remote devices.
- Smart plan is available on select remote devices.
Procedure
Step 1 Log in to the PC client.
Step 2 Click 📋 on the upper-right corner and then click Event.
You can also click Event from the configuration list on the home page.
Step 3 Select a remote device in the device tree on the left.
Step 4 Select Smart Plan > Smart Plan.

- The smart functions available might differ depending on the remote devices.
- When the remote device is a PTZ camera, configure presets on the camera system first, and then you can set AI functions for each preset of the PTZ camera.
Step 5 Click to enable the smart plan.
Step 6 Click Apply.
4.2.2 Configuring Face Detection
Configure the alarm rule of face detection.
Procedure
Step 1 Log in to the PC client.
Step 2 Click 📋 on the upper-right corner and then click Event.
You can also click Event from the configuration list on the home page.
Step 3 Select a remote device on the device tree, and then select Smart Plan > Face Detection.
Step 4 Configure face detection.
- Click AI by Camera, and then click to enable face detection.
- Click ☐ to enable face enhancement, which enables the system to preferably guarantee clear faces with low stream.
- Click ☐ or ☐ to set the minimum size or maximum size of the face detection zone. The system triggers an alarm only when the size of detected target is between the maximum size and the minimum size.
Step 5 Click Schedule to select a schedule from the drop-down list.
The system triggers corresponding alarm actions only during the alarm deployment period.

You can select an existing schedule from the Schedule drop-down list. You can also add a new schedule. For details, see "6.7.3 Schedule".
Step 6 Click Select next to Event Linkage to set alarm actions. For details, see "6.4.1 Alarm Actions".
Step 7 Click Save.
4.2.3 Live View of Face Detection
You can view real-time face detection images and video.
4.2.3.1 Setting Attribute Display
You can configure the display rule of face detection results.
Prerequisites
Before using this function, make sure that view has been created.
Procedure
Step 1 Log in to the PC client.
Step 2 Under the Live tab, open a view window.
Step 3 Click ⚙️ and then select the Face tab.
Step 4 Enable Target Box Overlay.
After it is enabled, when the system detects a face, a box will appear on the target.
Step 5 Configure AI attributes settings.
With AI Attributes Settings enabled by default, when the system detects a face, a features panel appears on the live video. You can configure the style of the features panel and the attributes that you want to display.
1) Select the Face Detection panel.
2) Select the attributes that you want to display.
- You can select up to 4 attributes.
- 4 attributes have been selected by default. To select other attributes, cancel the selected attributes, and then select the ones you need.
3) On the AI Attributes section, select the attribute groups for face detection.
Each face attribute is broken down into more specific groups. For example, you can
select Male, Female or Unknown for Gender.
Figure 4-2 Attribute display

Step 6 Click Save.
4.2.3.2 Live View
Log in to the PC client, and then under theLive tab, open a view window.
- The video window displays the target boxes of currently detected faces.
- The number next to 🙏 at the upper-right corner of the Live page represents the number of detected faces.
- You can view the detection time, face snapshot, and face attributes on the features panel on the right side of the Live page.
- Features panels are displayed on the right side of the Live page.
Point to a features panel, and then the icons are displayed.
Figure 4-3 Face records

Table 4-2 Management of face records
| Icon Operation | |
| Download the face snapshot and related video.When operating on the local interface, you need to insert a USB storage device into the Device. | |
| Click the icon or double-click the record to play back the 10 seconds of video before and after the snapshot. |
4.2.4 Face Search
Search for face detection information, including face detection image, record and features.
4.2.4.1 Searching by Attributes
Procedure
Step 1 Log in to the PC client.
Step 2 Click 🔒 on the upper-right corner of the Live page, or select AI Search on the home page.
Step 3 Select Face Search.
Step 4 Select one or more remote devices, and then set Event Type and Face Detection.
Step 5 Set face attributes and search period.
Step 6 Click Search.
Related Operations
Point to a record, and then the operation icons are displayed.
Table 4-3 Management of search results
| Icon Operation | |
| [362C] | Click the icon to select the record.To select all the records at a time, select the checkbox next toSelect All. |
| [362T] | Export the face snapshot, video and video player.To export in batches, select multiple face records, and then clickExportto export snapshots, videos or excel.[IMAGE]After you set alarm linkage snapshot, the system exports detected images and panoramic images at the time of snapshot. |
| [7W8P] | Click the icon or double-click the record to play back the 10 seconds of video before and after the snapshot. |
4.2.4.2 Exporting Face Records
After you search for face images under the AI Search tab, you can export the search results.

- When operating on the local interface, you need to insert a USB storage device into your EVS.
- If you have configured alarm-linked picture storage, the exported alarm-linked snapshot contains the face snapshot and the background picture.
- Export in batches.
Export more than one record. Support specifying file formats.
- Select one or more face records.

To export all records, select the checkbox next to Select All.
-
Click Export, and then select the format of the information that you want to export. You can export the images, videos and an excel that contains attributes information.
-
Click Browse to select a storage path.
-
Click OK.
- Export one by one.
The exported file contains the image, video and video player by default.
-
Point to the panel of a record, and then click .
-
Select a file type for the video, set the storage path, and then click OK.
-
Click OK.
4.3 Face Comparison
The system compares captured face with the faces in the database and then works out the similarity. When the similarity reaches the threshold as you have defined, an alarm will be triggered.
4.3.1 Enabling the Smart Plan
To use AI by Camera, you need to enable the corresponding smart plan first. For details, see "4.2.1 Enabling the Smart Plan".
4.3.2 Configuring Face Recognition
Configure the alarm rule of face comparison.
Procedure
Step 1 Log in to the PC client.
Step 2 Click 📋 on the upper-right corner and then click Event.
You can also click Event from the configuration list on the home page.
Step 3 Select a remote device on the device tree, and then select Smart Plan > Face Comparison.
Step 4 Click AI by Camera, and then click to enable face comparison.
Step 5 Click Schedule to select a schedule from the drop-down list.
The system triggers corresponding alarm actions only during the alarm deployment period.

You can select an existing schedule from the Schedule drop-down list. You can also add a new schedule. For details, see "6.7.3 Schedule".
Step 6 Click Select next to Event Linkage to set alarm actions. For details, see "6.4.1 Alarm
Actions".
Step 7 Click Save.
4.3.3 Live View of Face Comparison
You can view real-time face comparison images under the Live tab.
4.3.3.1 Setting Attribute Display
You can configure display rule of AI detection results.

Before using this function, make sure that view has been created.
Procedure
Step 1 Log in to the PC client.
Step 2 Under the Live tab, open a view window.
Step 3 Click 🔒 and then select the Face tab.
Step 4 Configure AI attributes settings.
With AI Attributes Settings enabled by default, when the system detects a face, a features panel appears on the live video. You can configure the style of the features panel and the attributes that you want to display.
1) Select the attributes that you want to display.
- You can select up to 4 attributes.
- 4 attributes have been selected by default. To select other attributes, cancel the selected attributes, and then select the ones you need.
2) On the AI Attributes section, select the attribute groups for face detection.
Each face attribute is broken down into more specific groups. For example, you can select Male, Female or Unknown for Gender.
Figure 4-4 Attribute display

Step 5 Click Save.
Step 6 Click and then select the Human tab.
Step 7 Configure AI attributes settings.
With AI Attributes Settings enabled by default. You can configure the style of the features panel and the attributes that you want to display.
1) Select the attributes that you want to display.
- You can select up to 4 attributes.
- 4 attributes have been selected by default. To select other attributes, cancel the selected attributes, and then select the ones you need.
2) On the AI Attributes section, select the attribute groups for body detection.
Each body attribute is broken down into more specific groups. For example, you can select long sleeves, Short Sleeves or Unknown for Sleeve.
Figure 4-5 Attribute display

Step 8 Click Save.
4.3.3.2 Live View
Log in to the PC client, and then under theLive tab, open a view window.
- The video window displays the target boxes of currently detected faces.
- The number next to 🙏 at the upper-right corner of the Live page represents the number of detected faces.
- You can view the detection time, the detected face image, face image in the database, comparison result and database name on the features panel on the right side of theLive page. After enabling the stranger mode, when the detected face image has no match in the database, a Stranger tag appears on the features panel.
- Point to a features panel and then the operations icons are displayed.
Table 4-4 Management of face records
| Icon Operation | |
![]() | Download the face snapshot and related video.![]() —When operating on [8806]: local interface, you need to insert a USB storage device into the Dev![]() |
| ◎ | Click the icon or dou [4AWHT]:-click the record to play back the 10 seconds of video before and after the [3CBK] snapshot. |
4.3.4 Face Search
You can search face records by attributes or by image, and then export the search results.
4.3.4.1 Searching by Attributes
Procedure
Step 1 Log in to the PC client.
Step 2 Click 🔒 on the upper-right corner of the Live page, or select AI Search on the home page.
Step 3 Select Face Search.
Step 4 Select one or more remote devices, and then set Event Type to Face Recognition.
Step 5 Select a face mode.
- General: Search for faces without the stranger or high frequency tag.
- Stranger: Search for faces with the stranger tag.

Make sure that stranger mode has been enabled for face comparison.
Step 6 Set face attributes and search period.
Step 7 Click Search.
Related Operations
Point to a record, and then the following icons are displayed.
Table 4-5 Management of search results
| Icon Operation | |
![]() | Click the icon to select the record.To select all the records at a time, select the checkbox next toSelect All. |
![]() | Export the face snapshot, video and video player.To export in batches, select multiple face records, and then clickExportto export snapshots, videos or excel. After you set alarm linkage snapshot, the system exports detected images and panoramic images at the time of snapshot. |
| [2667] | Click the icon or double-click the record to play back the 10 seconds of video before and after the snapshot. |
4.3.4.2 Exporting Face Records
Export the face records, including pictures, videos and detailed information. For details, see "4.2.4.2 Exporting Face Records".
4.4 People Counting
This Device can count the people flow, in-area people number, and queuing number in the detection zone.

- The people counting function is only available with AI by Camera. Make sure that the camera has been configured with people counting rules.
- The old people counting data will be overwritten when the storage space runs out. Remember to back up the data in time.
4.4.1 Enabling the Smart Plan
To use AI by Camera, you need to enable the corresponding smart plan first. For details, see "4.2.1 Enabling the Smart Plan".
4.4.2 Configuring People Counting
The system counts the number of people in and out of the detection area. When the number of entry, exit or stay reaches the threshold, an alarm is triggered.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Event.
You can also click Event from the configuration list on the home page.
Step 3 Select a remote device on the device tree, and then select Smart Plan > People
Counting > Rule Config.
Step 4 Click Add Rule, select People Counting, and then click to enable the function.
Step 5 Draw a people counting zone.
- Click ☐ to draw the detection zone.
- Click to draw the counting line. The line must be perpendicular to direction of the people flow.
- Click Ⓞ to set the whole image as the detection area.
Step 6 Set parameters.
Table 4-6 Parameter description of people counting
| Parameter Description | |
| People Counting Alarm | Click Reset to reset the numbers of entry and exit. |
| Enter No. | Number of people that entered. |
| Exit No. | Number of people that exited. |
| Stay No. | The number of stay is the result of entry number minus exit number. An alarm is triggered when the stay number reaches the threshold. |
Step 7 Click Schedule to select a schedule from the drop-down list.
The system triggers corresponding alarm actions only during the alarm deployment period.

You can select an existing schedule from the Schedule drop-down list. You can also add a new schedule. For details, see "6.7.3 Schedule".
Step 8 Click Select next to Event Linkage to set alarm actions. For details, see "6.4.1 Alarm Actions".
Step 9 Click Save.
4.4.3 Configuring In Area No.
The system counts the number of people in and out of the detection area. When the number of entry or exit is larger or smaller than the threshold or when the dwell time of any person in the area is greater than the threshold, an alarm is triggered.
Procedure
Step 1 Log in to the PC client.
Step 2 Click ☐ on the upper-right corner and then click Event.
You can also click Event from the configuration list on the home page.
Step 3 Select a remote device on the device tree, and then select Smart Plan > People Counting > Rule Config.
Step 4 Click Add Rule, select Area People Counting, and then click to enable the function.
Step 5 Draw a detection zone.
- Click to draw the detection zone.
- Click to set the whole image as the detection area.
Step 6 Set parameters.
Table 4-7 Parameter description of in-area people counting
| Parameter Description | |
| Area People Counting Alarm | 1. Click to enable the alarm.2. Set people number threshold.If you select ≥ Threshold and then enter a number, an alarm is triggered when the detected number is larger or equal to the number that you entered.If you select ≤ Threshold and then enter a number, an alarm is triggered when the detected number is smaller or equal to the number that you entered.If you select = Threshold and then enter a number, an alarm is triggered when the detected number is equal to the number that you entered.If you select Threshold and then enter a number, an alarm is triggered when the detected number is different from the number that you entered. |
| Stay Alarm | 1. Click to enable the alarm.2. Set time threshold for the alarm. When the dwell time of any person in the area is greater than the threshold, an alarm will be triggered. |
Step 7 Click Schedule to select a schedule from the drop-down list.
The system triggers corresponding alarm actions only during the alarm deployment period.

You can select an existing schedule from the Schedule drop-down list. You can also add a new schedule. For details, see "6.7.3 Schedule".
Step 8 Click Select next to Event Linkage to set alarm actions. For details, see "6.4.1 Alarm Actions".
Step 9 Click Save.
4.4.4 Configuring Queuing Detection
The system counts the number of people queuing in the detection area. When the number of people exceeds the threshold or the queue time is longer than the pre-defined time, an alarm is triggered.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Event.
You can also click Event from the configuration list on the home page.
Step 3 Select a remote device on the device tree, and then select Smart Plan > People
Counting > Queuing.
Step 4 Click Add Rule, select Queuing, and then click to enable the function.
Step 5 Draw a detection zone.
- Click to draw the detection zone.
- Click Ⓞ to set the whole image as the detection area.
Step 6 Set parameters.
Table 4-8 Parameter description of queuing detection
| Parameter Description | |
| Queue People No. Alarm | 1. Click to enable the alarm.2. Set people number threshold.If you select ≥ Threshold and then enter a number, an alarm is triggered when the detected number is larger or equal to the number that you entered.If you select ≤ Threshold and then enter a number, an alarm is triggered when the detected number is smaller or equal to the number that you entered.If you select = Threshold and then enter a number, an alarm is triggered when the detected number is equal to the number that you entered.If you select Threshold and then enter a number, an alarm is triggered when the detected number is different from the number that you entered. |
| Queuing Time Alarm | 1. Click to enable the alarm.2. Set time threshold for the alarm. When the queuing time of any person in the area is longer than the threshold, an alarm will be triggered. |
Step 7 Click Schedule to select a schedule from the drop-down list.
The system triggers corresponding alarm actions only during the alarm deployment period.

You can select an existing schedule from the Schedule drop-down list. You can also add a new schedule. For details, see "6.7.3 Schedule".
Step 8 Click Select next to Event Linkage to set alarm actions. For details, see "6.4.1 Alarm Actions".
Step 9 Click Save.
4.4.5 Live View
Log in to the PC client, and then under theLive tab, open a view window that contains people counting video. You can view the real-time people number and queuing time on the video. The region frame flashes when there is an alarm. The queue-detection live view also shows head frames and the dwell time of each person.
4.4.6 Viewing AI Report
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select AI Report > AI Report > People Counting
Step 3 Select a device. You can only select an AI fisheye camera or people counting camera.
Step 4 Select an event type from People Counting, Area People Counting and Queue People Counting.
Step 5 Select a statistics type.
- When the event type is People counting, you cannot select the statistics type.
-
When the event type is Area People counting, you can select the statistics type from People Counting and Average Stay Time, and then select the stay time (5 s, 30 s, 60 s).
-
People Counting: Select the stay time. The report shows the number of people that linger longer or shorter than the defined stay time in different colors.
Average Stay Time: The report shows the average stay time during different periods.
- When the event type is Queue People Counting, select the queue time. The report shows the number of people queuing longer or shorter than the queue time in different colors.
Step 6 Select a period type from Date, month or year. Daily, Monthly, and Yearly, and then set the corresponding
Step 7 Click OK. The report is displayed.
Related Operations
- Point to the report, and then the report shows the details at that time point.
- Drag the gray scroll bar under the ordinate to view the statistics for different time periods.
- Click 📋 to view the line chart.
- Click 📁 to view the bar chart.
- Click to export the report.
4.5 Video Metadata
The system analyzes real-time video stream to detect the existence of 4 target types: human, human face, motor vehicle, non-motor vehicle. Once a target is detected, the system can record video, take snapshots and trigger alarms.
4.5.1 Enabling the Smart Plan
To use AI by Camera, you need to enable the corresponding smart plan first. For details, see "4.2.1 Enabling the Smart Plan".
4.5.2 Configuring Video Metadata
After enabling video metadata, the Device links the current remote device to record video when an alarm is triggered. You cannot set other linkage actions for video metadata when AI by Camera is used.
Procedure
Step 1 Log in to the PC client.
Step 2 Click 📋 on the upper-right corner and then click Event.
You can also click Event from the configuration list on the home page.
Step 3 Select a remote device on the device tree, and then select Smart Plan > Video Metadata.
Step 4 Configure video metadata.
-
Click AI by Camera, and then click to enable the function.
-
Click next to On to enable people detection, motor vehicle detection and non-motor vehicle detection.
Step 5 Click Schedule to select a schedule from the drop-down list.
The system triggers corresponding alarm actions only during the alarm deployment period.

You can select an existing schedule from the Schedule drop-down list. You can also add a new schedule. For details, see "6.7.3 Schedule".
Step 6 Click Save.
4.5.3 Live View of Video Metadata
View the detection results of face, people, motor vehicle and non-motor vehicle under the Live tab.
4.5.3.1 Setting Attribute Display
Configure the display rule of video metadata detection results.
Prerequisites
Before using this function, make sure that view has been created.
Procedure
Step 1 Log in to the PC client.
Step 2 Under the Live tab, open a view window.
Step 3 Click ⚙️ and then select the Human tab.
Step 4 Configure AI attributes settings.
With AI Attributes Settings enabled by default, when the system detects a target, a features panel appears on the live video. You can configure the style of the features panel and the attributes that you want to display.
1) Select the panel styles.
2) Select the attributes that you want to display.
- You can select up to 4 attributes.
- 4 attributes have been selected by default. To select other attributes, cancel the selected attributes, and then select the ones you need.
3) On the AI Attributes section, select the attribute groups for video metadata.
Each attribute is broken down into more specific groups. For example, you can select Male, Female or Unknown for Gender.
Figure 4-6 Attribute display

Step 5 Click Save.
4.5.3.2 Live View
Log in to the PC client, and then under theLive tab, open a view window. The video image of the view is displayed.
- The target box is displayed in real-time in the video image. Different detection targets correspond to different colors of target boxes.
- You can view the statistics on the detected targets at the upper-right corner of the Live page.
:face.
◇ : human.
◇ : motor vehicle.
◇ : non-motor vehicle.
- Features panels are displayed on the right side of the Live page.
Point to a features panel, and then the icons are displayed.
Table 4-9 Management of detection results
| Icon Operation | |
![]() | Download the snapshot and related video. When operating on the local interface, you need to insert a USB storage device into the Device. |
![]() | Click the icon or double-click the record to play back the 10 seconds of video before and after the snapshot. |
4.5.4 AI Search
You can search for video metadata detection records.
4.5.4.1 Human Search
Search for human detection results.
Procedure
Step 1 Log in to the PC client.
Step 2 Click 🔒 on the upper-right corner of the Live page, or select AI Search on the home page.
Step 3 Select Human Search.
Step 4 Select one or more remote devices, and then set Event Type to Human Detection.
Step 5 Set human attributes and search period.
Click to select a color. indicates all colors.
Figure 4-7 Search by human attributes

Step 6 Click Search.
- If face is captured, the human and face snapshots are displayed.
- If no face is captured, the human snapshot and human attributes are displayed.
Related Operations
Point to a record, and then the following icons are displayed.
Table 4-10 Management of search results
| Icon Operation | |
| [1993] | Click the icon to select the record.To select all the records at a time, select the checkbox next toSelect All.Export the snapshot, video and video player.To export in batches, select multiple records, and then click Export to export snapshots, videos or excel.[IMAGE]After you set alarm linkage snapshot, the system exports detected images and panoramic images at the time of snapshot. |
| [42-46] | Click the icon or double-click the record to play back the 10 seconds of video before and after the snapshot. |
4.5.4.2 Vehicle Search
Search for vehicle detection results.
Procedure
Step 1 Log in to the PC client.
Step 2 Click 🔒 on the upper-right corner of the Live page, or select AI Search on the home page.
Step 3 Select Motor Vehicle Search, and then select one or more remote devices.
Step 4 Set Event Type to Motor Vehicle Detection.
Step 5 Set vehicle attributes and search period.
Click to select a color. indicates all colors.
Figure 4-8 Search by vehicle attributes

Step 6 Click Search.
If license plate is detected, both the scene of the vehicle and the license plate will be displayed.
Related Operations
Point to a record, and then the following icons are displayed.
Table 4-11 Management of search results
| Icon Operation | |
| [20MH] | Click the icon to select the record.To select all the records at a time, select the checkbox next toSelect All.Export the snapshot, video and video player.To export in batches, select multiple records, and then click Export to export snapshots, videos or excel.[CIVW]After you set alarm linkage snapshot, the system exports detected images and panoramic images at the time of snapshot. |
| [7728] | Click the icon or double-click the record to play back the 10 seconds of video before and after the snapshot. |
4.5.4.3 Non-motor Vehicle Search
Search for non-motor vehicle detection results.
Procedure
Step 1 Log in to the PC client.
Step 2 Click 🔒 on the upper-right corner of the Live page, or select AI Search on the home page.
Step 3 Select Non-Motor Vehicle Search, and then select one or more remote devices.
Step 4 Set Event Type to Non-Motor Vehicle Detection.
Step 5 Set vehicle attributes and search period.
Click to select a color. indicates all colors.
Step 6 Click Search.
Related Operations
Point to a record, and then the following icons are displayed.
Table 4-12 Management of search results
| Icon Operation | |
![]() | Click the icon to select the record.To select all the records at a time, select the checkbox next to Select All. |
![]() | Export the snapshot, video and video player.To export in batches, select multiple records, and then click Export to export snapshots, videos or excel.[IMAGE]After you set alarm linkage snapshot, the system exports detected images and panoramic images at the time of snapshot. |
![]() | Click the icon or double-click the record to play back the 10 seconds of video before and after the snapshot. |
4.6 IVS
The IVS feature includes a number of behavior detections such as fence-crossing, intrusion, tripwire, parking, crowd gathering, missing object, abandoned object, and loitering.
4.6.1 Enabling the Smart Plan
To use AI by Camera, you need to enable the corresponding smart plan first. For details, see "4.2.1 Enabling the Smart Plan".
4.6.2 Configuring IVS
4.6.2.1 Global Configuration
Configure global rules of IVS.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Event.
You can also click Event from the configuration list on the home page.
Step 3 Select a remote device on the device tree, and then select Smart Plan > IVS.
Step 4 Select AI By Camera > Global Config.
Step 5 Drag to adjust sensitivity.
Step 6 Calibrate horizontal and vertical scales.
1) Click ☐ to draw an area.
2) Click ☐ to draw three vertical lines, enter the actual length, and then click Calibration Verification.
3) Click 📄 to draw a horizontal line, enter the actual length, and then click Calibration Verification.
Step 7 Click Save.
4.6.2.2 Rule Configuration
Background Information
Configure IVS rules. IVS functions with AI by Camera include crossing fence, tripwire, intrusion, abandoned object, parking detection, people gathering, object removed, and loitering. Different cameras support different functions. Different devices support different functions, please refer to the actual interface.
Table 4-13 IVS functions description
| Functions Description Scene | ||
| Tripwire | When the target crosses tripwire from the defined motion direction, an alarm is triggered, and then the system performs configured alarm linkages. | Scenes with sparse targets and no occlusion among targets, such as the perimeter protection of unattended area. |
| Intrusion | When the target enters, leaves, or appears in the detection area, an alarm is triggered, and the system performs configured alarm linkages. | |
| Abandoned Object | When an object is abandoned in the detection area over the configured time, an alarm is triggered, and then the system performs configured alarm linkages. | Scenes with sparse targets and without obvious and frequent light change.Simple scene in the detection area is recommended.Missed alarm might increase in the scenes with dense targets, frequent occlusion, and people staying.In scenes with complex foreground and background, false alarm might be triggered for abandoned or missing object. |
| Missing Object | When an object is taken out of the detection area for more than the defined period, an alarm is triggered, and then the system performs configured alarm linkages. | |
| Fast Moving | When the target moves fast in the detection area, an alarm is triggered, and then the system performs configured alarm linkages. | Scene with sparse targets and less occlusion. The camera should be installed right above the monitoring area. The light direction should be vertical to the motion direction. |
| Parking Detection | When the vehicle stays in the detection area longer than the configured duration, an alarm is triggered, and then the system performs configured alarm linkages. | Road monitoring and traffic management. |
| Crowd Gathering | When people gather and stay in the detection area longer than the defined duration, an alarm is triggered, and then the system performs configured alarm linkages. | Scenes with medium or long distance, such as outdoor plaza, government entrance, station entrance and exit. It is not suitable for short-distance view analysis. |
| Loitering | When the target loiters over the shortest alarm period, an alarm is triggered, and then the system performs configured alarm linkages. | Scenes such as park and hall. |
| Crossing Fence | When the target crosses the warning line toward the defined direction, an alarm is triggered and then the system performs configured alarm linkages. | Scenes with median strips such as roads, and airports. |
This section uses the configuration of tripwire as the example.
Procedure
Step 1 Log in to the PC client.
Step 2 Click 📋 on the upper-right corner and then click Event.
You can also click Event from the configuration list on the home page.
Step 3 Select a remote device on the device tree, and then select Smart Plan > IVS.
Step 4 Set tripwire rules.
- Select AI By Camera > Rule Config.
- Click Add Rule, and then select Tripwire.
- Click to enable the detection rule.
-
Click ✦ to edit the tripwire line.
-
Click the dots on the 2 ends of the line to adjust its length.
- Drag the line to adjust its position.
-
Select a direction from A to B, B to A, and Both. An alarm will be triggered only when the target crosses the line in the designated direction.
-
Click ☐ or ☐ to set minimum size or maximum size of the detection target.
The system triggers an alarm only when the detected target size is between the maximum size and the minimum size.
Step 5 Configure target filter and sensitivity.
After setting target filter and the target type, when the system detects a target, a rule box will appear beside the target on the video.
1) Click ○ to enable the function.
2) Select a recognition type.
3) Configure sensitivity.
The higher the sensitivity, the easier to trigger tripwire alarm, but meanwhile the higher probability of false alarm.

Sensitivity is available when AI by Camera is used and the camera supports this function.
Step 6 Click Schedule to select a schedule from the drop-down list.
The system triggers corresponding alarm actions only during the alarm deployment period.

You can select an existing schedule from the Schedule drop-down list. You can also add a new schedule. For details, see "6.7.3 Schedule".
Step 7 Click Select next to Event Linkage to set alarm actions. For details, see "6.4.1 Alarm Actions".
Step 8 Click Save.
4.6.3 Live View of IVS
Under the Live tab, view the real-time IVS results.
4.6.3.1 Setting Attribute Display
Configure the display rule of IVS detection results.
Prerequisites
Before using this function, make sure that view has been created.
Procedure
Step 1 Log in to the PC client.
Step 2 Under the Live tab, open a view window.
Step 3 Click ⚙️ and then select the Human, and Motor Vehicle tab.
Figure 4-9 Human

Figure 4-10 Motor vehicle

Step 4 Configure AI attributes settings.
With AI Attributes Settings enabled by default, when the system detects a target, a features panel appears on the live video. You can configure the style of the features panel and the attributes that you want to display.
1) Select the panel styles.
2) Select the attributes that you want to display.
- You can select up to 4 attributes.
- 4 attributes have been selected by default. To select other attributes, cancel the selected attributes, and then select the ones you need.
3) On the AI Attributes section, select the attribute groups for video metadata. Each attribute is broken down into more specific groups. For example, you can select Male, Female or Unknown for Gender.
Step 5 Click Save.
4.6.3.2 Live View
Log in to the PC client, and then under theLive tab, open a view window. The video image of the view is displayed.
- When a target triggers tripwire or intrusion rule, the line or region frame in the view flickers in red.
- After setting target filter, when the system detects a person or vehicle, a rule box will appear beside the person and vehicle in the view.
- You can view the detection statistics on the upper-righter corner of the Live page.
Figure 4-11 Detection statistics

- Features panels are displayed on the right side of the video image.
Point to the features panel, and the icons are displayed.
☐ : Click the icon or double-click the record to play back the 10 seconds of video before and after the snapshot.
- Point to a record, and then click ↓ to export the snapshot and video to the specified storage path.

Make sure that USB storage device is connected during local operation.
4.6.4 IVS Search
Search for IVS records.
Procedure
Step 1 Log in to the PC client.
Step 2 Click 🔒 on the upper-right corner of the Live page, or select AI Search on the home page.
Step 3 Select IVS, and then select one or more remote devices.
Step 4 Set the event type, effective target and search period.
Step 5 Click Search.
Related Operations
Point to a record, and then the following icons are displayed.
Table 4-14 Management of search results
| Icon Operation | |
| [TASK] | Click the icon to select the record.To select all the records at a time, select the checkbox next toSelect All. |
| [VC3X] | Export the snapshot, video and video player.To export in batches, select multiple records, and then clickExportto export snapshots, videos or excel.[ABC]After you set alarm linkage snapshot, the system exports detected images and panoramic images at the time of snapshot. |
| [YQ38] | Click the icon or double-click the record to play back the 10 seconds of video before and after the snapshot. |
4.7 Vehicle Recognition
An alarm is triggered when the detected vehicle meets detection rule.

The Device supports only ANPR through AI by Camera. Make sure that the vehicle recognition parameters of camera are configured. For details, see the user's manual of the camera.
4.7.1 Enabling the Smart Plan
To use AI by Camera, you need to enable the corresponding smart plan first. For details, see "4.2.1 Enabling the Smart Plan".
4.7.2 Setting Vehicle Recognition
Set the deployment time and alarm linkage actions for vehicle recognition.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Event.
You can also click Event from the configuration list on the home page.
Step 3 Select a remote device on the device tree, and then select Smart Plan > Vehicle Recognition.

The function is enabled by default and cannot be disabled.
Step 4 Click Schedule to select a schedule from the drop-down list.
The system triggers corresponding alarm actions only during the alarm deployment period.

You can select an existing schedule from the Schedule drop-down list. You can also add a new schedule. For details, see "6.7.3 Schedule".
Step 5 Click Select next to Event Linkage to set alarm actions. For details, see "6.4.1 Alarm Actions".
Step 6 Click Save.
4.7.3 Live View of Vehicle Recognition
View vehicle recognition results under the Live tab.
4.7.3.1 Setting Attribute Display
Configure the display rule of vehicle recognition results.
Prerequisites
Before using this function, make sure that view has been created.
Procedure
Step 1 Log in to the PC client.
Step 2 Under the Live tab, open a view window.
Step 3 Click 🔍 and then select the Motor Vehicle tab.
Figure 4-12 Motor vehicle

Step 4 Configure AI attributes settings.
With AI Attributes Settings enabled by default, when the system detects a target, a features panel appears on the live video. You can configure the style of the features panel and the attributes that you want to display.
1) Select the panel styles. 2) Select the attributes that you want to display.
- You can select up to 4 attributes. - 4 attributes have been selected by default. To select other attributes, cancel the selected attributes, and then select the ones you need.
3) On the AI Attributes section, select the attribute groups for video metadata. Each attribute is broken down into more specific groups. For example, you can select Bus, Heavy Truck, Van and more for Vehicle Type.
Step 5 Click Save.
4.7.3.2 Live View
Log in to the PC client, and then under theLive tab, open a view window. The video image of the view is displayed.
- Target box is displayed in the video image.
- The number next to 📋 at the upper-right corner of the Live page represents the number of detected motor vehicles.
- Features panel is displayed at the right side of the Live page.
Point to the features panel, and the operation icons are displayed.
- Click 🏠 or double-click the vehicle image to play back the video image (10 s before and after the snapshot).
- Click ↓ to export the snapshot and video to the specified storage path.
4.7.4 Searching for Detection Results
Search for vehicle recognition results. For details, see "4.5.4.2 Vehicle Search".
4.8 Crowd Distribution Map
View and monitor people crowd to avoid crowd incidents, for example, stampede.

This function is only available with AI by Camera.
4.8.1 Enabling the Smart Plan
To use AI by Camera, you need to enable the corresponding smart plan first. For details, see "4.2.1 Enabling the Smart Plan".
4.8.2 Configuring Crowd Distribution Map
Set crowd distribution alarm rules.
4.8.2.1 Global Configuration
Draw lines on the image to determine the geographical scale of the image.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Event.
You can also click Event from the configuration list on the home page.
Step 3 Select a remote device on the device tree, and then select Smart Plan > IVS.
Step 4 Select AI By Camera > Global Config.
Step 5 Draw 1 horizontal line and 3 vertical lines.
- Click ☐, draw vertical lines, and then enter their geographical distance values.
- Click , draw a horizontal line, and then enter the geographical distance value.
Step 6 Click Save.
4.8.2.2 Rule Configuration
Configure the alarm threshold for crowd monitoring.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Event.
You can also click Event from the configuration list on the home page.
Step 3 Select a remote device on the device tree, and then select Smart Plan > IVS.
Step 4 Select AI By Camera > Rule Config.
Step 5 In the device tree, select a camera.
Step 6 Select AI Application > Crowd Distribution Map > Rule Config.
Step 7 Set detection rules.
- Set regional alarm.
An alarm is triggered when the number of detected people exceeds the threshold.
- Click Add Rule.
- Click □ and then drag the corners to adjust the size of the yellow zone.
- Drag the corners to adjust the size of the regional detection zone (red). Make sure that the red zone is smaller than the yellow zone.
- Configure alarm threshold.
- Set global alarm.
An alarm is triggered when the detected crow density exceeds the threshold.
- Click ○ to enable global detection.
- Click □ and then drag the corners to adjust the size of the yellow zone.
- Set the crow density.
Step 8 Click Schedule to select a schedule from the drop-down list.
The system triggers corresponding alarm actions only during the alarm deployment period.

You can select an existing schedule from the Schedule drop-down list. You can also add a new schedule. For details, see "6.7.3 Schedule".
Step 9 Click Select next to Event Linkage to set alarm actions. For details, see "6.4.1 Alarm Actions".
Step 10 Click Save.
4.8.3 Live View of Crowd Distribution
Log in to the PC client, and then under theLive tab, open a view window. The video image of the view is displayed.
The video shows people numbers and distribution status in the detection zones in real time. The frame around the detection zone flashes red when there is an alarm in the zone.
Figure 4-13 Live view of crowd distribution

natural_image
Street scene with people near a public bus stop and accessibility barriers (no visible text or symbols)- Right-click the live video, and then select Crowd Distribution Map > PIP. A blue section is displayed, and you can view the crowd distribution status inside the current view.
- Right-click the live video, and then select Crowd Distribution Map > Global to view overall crowd density and people heads.
4.9 Call Alarm
An alarm is triggered when the system detects a person calling. To configure call alarm, set call detection rules for the visible light channel of a thermal camera.

Call alarm is only available with AI by Camera.
4.9.1 Enabling the Smart Plan
To use AI by Camera, you need to enable the corresponding smart plan first. For details, see "4.2.1 Enabling the Smart Plan".
4.9.2 Configuring Call Alarm
Configure call alarm rules. The call alarm is only available with thermal cameras.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Event.
You can also click Event from the configuration list on the home page.
Step 3 On the device tree, select the visible light channel of a thermal camera.
Step 4 Select Smart Plan > Call Detection.
Step 5 Click to enable the function.
Step 6 Click and then drag the corners to adjust the detection zone.
Step 7 Set the sensitivity and minimum duration.
- Sensitivity: The higher the sensitivity, the easier the call action is detected but meanwhile the higher probability of false alarms.
- Minimum duration: If the call action still lasts longer than the minimum duration, the system will trigger an alarm.
Step 8 Click Schedule to select a schedule from the drop-down list.
The system triggers corresponding alarm actions only during the alarm deployment period.

You can select an existing schedule from the Schedule drop-down list. You can also add a new schedule. For details, see "6.7.3 Schedule".
Step 9 Click Select next to Event Linkage to set alarm actions. For details, see "6.4.1 Alarm Actions".
Step 10 Click Save.
4.9.3 Live View of Call Alarm
Log in to the PC client, and then under theLive tab, open a view window. The video image of the view is displayed. When an alarm is triggered, the detection zone flashes red.
4.9.4 Call Alarm Search
Search for videos or images of call alarm.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, click Search.
Step 3 Select one or more devices.
Step 4 You can search for the videos or images of call detection.
- Videos
- Under the Record tab, select Thermal as video type.
- Select Call Detection as detection type.
- Select a stream type.
- Set the search period.
- Click Search.
- Images
- Under the Picture tab, select Thermal as snapshot type.
- Select Call Detection as detection type.
- Set the search period.
- Click Search.
4.10 Smoking Alarm
An alarm is triggered when the system detects a person smoking.

Smoking alarm is only available with AI by Camera.
4.10.1 Enabling the Smart Plan
To use AI by Camera, you need to enable the corresponding smart plan first. For details, see "4.2.1 Enabling the Smart Plan".
4.10.2 Configuring Smoking Alarm
Configure smoking alarm rules. Smoking detection in only available with thermal cameras.
Procedure
Step 1 Log in to the PC client.
Step 2 Click 📋 on the upper-right corner and then click Event.
You can also click Event from the configuration list on the home page.
Step 3 On the device tree, select the thermal channel of a thermal camera.
Step 4 Select Smart Plan > Smoking Detection.
Step 5 Click to enable the function.
Step 6 Set the sensitivity and minimum duration.
- Sensitivity: The higher the sensitivity, the easier the smoking action is detected but meanwhile the higher probability of false alarms.
- Minimum duration: If the smoking action still lasts longer than the minimum duration, the system will trigger an alarm.
Step 7 Click Schedule to select a schedule from the drop-down list.
The system triggers corresponding alarm actions only during the alarm deployment period.

You can select an existing schedule from the Schedule drop-down list. You can also add a new schedule. For details, see "6.7.3 Schedule".
Step 8 Click Select next to Event Linkage to set alarm actions. For details, see "6.4.1 Alarm Actions".
Step 9 Click Save.
4.10.3 Live View of Smoking Alarm
Log in to the PC client, and then under theLive tab, open a view window. The video image of the view is displayed. When an alarm is triggered, the detection zone flashes red.
4.10.4 Smoking Alarm Search
Search for videos or images of smoking alarm.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, click Search.
Step 3 Select one or more devices.
Step 4 You can search for the videos or images of smoking detection.
- Videos
- Under the Record tab, select Thermal as video type.
- Select Smoking Detection as detection type.
- Select a stream type.
- Set the search period.
- Click Search.
- Images
- Under the Picture tab, select Thermal as snapshot type.
- Select Smoking Detection as detection type.
- Set the search period.
- Click Search.
5 General Operations
This chapter introduces general operations such as live view, playback, alarm, and more.
5.1 Live and Monitor
Log in to the PC client, and then under theLive tab, you can view the live videos.

Point to the left and right edges of the video windows, and then click

to hide or display the
left and right columns.
Figure 5-1 Live view

Table 5-1 Live page description
| No. Description | |
| 1 Device tree. | Displays added remote devices. |
| 2 View zone. | Displays the created views and view groups. |
| 3 PTZ control | zone. |
| 4 | Click: You can select Default, Realtime or Fluent.Click: You can adjust the detection area and excluded area.Click: Turn rule box display on or off. |
| 5 | Layout adjustment.Click:click:click<or>to switch the channel. |
| 6 | : Take a snapshot of live view.: Display the live view in full screen.: Start the view window and save as a new view.: Start tour. You need to enable the function first in System > General > System Settings. |
| 7 | Features panels. A features panel appears when the system detected a target according to the configured rule. |
| 8 | Detection statistics. Displays the number of detected targets.: face.: human.: motor vehicle.: non-motor vehicle.: Set attribute display.: Go to AI Search. |
5.1.1 View Management
A view is composed of video images of several remote devices. Go to the view panel at the lower-left corner of the Live tab to check and open the view.
• View Group is created by default, under which you can create view groups and views.
- Double-click a view or drag the view to the play panel in the middle of the Live tab. The Device begins playing the real-time video from the remote device in the view.
- Click :☐ to select views, view groups and their sub-nodes.
Figure 5-2 View

5.1.1.1 View Group
A view group is a group of views. The view group helps you to categorize, search for and manage views quickly. Under View Group created by default, you can create view groups.

- You can create up to 100 view groups.
- The views hierarchy must not be more than 2. For example, after you create View Group 1 under View Group, you can create a sub-level View Group 2 under View Group 1. However, you cannot create a sub-level group under View Group 2.
5.1.1.1.1 Creating a View Group
Procedure
Step 1 Log in to the PC client.
Step 2 Under the Live tab, click View Group or a view group under it, and then click Add Group.
You can also right-click an existing view group and then click Add Group.
Step 3 Set the view group name.
- The group name consists of 1 to 64 characters. It can contain English letters, numbers and special characters.
- We recommend you set a name that help to distinguish and classify different view groups.
Step 4 Click any blank space on the page.
5.1.1.1.2 Managing View Groups
After creating a view group, you can rename or delete the view group.
Figure 5-3 Manage view groups

Table 5-2 View group management
| Operation Description | |
| Rename | Right-click a view group and selectRename. Set view group name and click any blank space. |
| Delete View group | [327y]Please be advised that once you delete a view group, all views under the view group will be deleted at the same time.Select one or more view groups and click . Right-click a view group and then selectDelete. |
5.1.1.2 View
A view contains video images from one or more remote devices. You can drag several remote devices to the same view and when view is enabled, you can view the real-time video from the remote devices at the same time.
5.1.1.2.1 Creating a View
Create a view and then add several remote devices to the view so that you can view the live videos from several channels at the same time.
Prerequisites
Remote devices have been added.
Procedure
Step 1 Log in to the PC client.
Step 2 Under the Live tab, click View Group or a view group under it, and then click Add View.
You can also right-click an existing view group and then click Add View.
Step 3 Double-click a remote device in resource pool, or drag the remote device to the view window.
After one remote device is added, the view window is split into several grids.
- Each grid supports one remote device. If you want to add more remote devices, drag them to unoccupied layout grids.
- If the layout grid has been occupied by a remote device, you can drag another remote device to the current grid to replace the original one.
- Drag the edges of the view window to adjust its size.

- The Device automatically creates the view grids according to the number of the selected remote devices. Device supports maximum 36 view windows.
- The view window fills in the whole layout grid by default. Right-click to select Original Scale > ON. The Device automatically adjusts the size of the view window according to the resolution of the remote device.
- When adjusting the position of the video window, you can drag the video window to a layout grid whose background color is green. You cannot drag the video window to the
grid of red background color.
Step 4 Set the view name.
The view name consists of 1 to 64 characters. It can contain English letters, numbers and special character.
Step 5 Click OK.
Related Operations
Table 5-3 View management
| Operation Description | |
| Edit | Edit remote devices in the view, window layout and view name. |
| Open | Open a view to watch real-time video of remote devices in the view. |
| Rename | Right-click a view, click Rename, enter the new name, and then click any blank space. |
| Delete | Delete one by one: Click a view and then click , or right-click a view and then select Delete.Delete in batches: Click , select views and then click . |
5.1.1.2.2 Editing a View
Procedure
Step 1 Log in to the PC client.
Step 2 Under the Live tab, right-click a view and then select Edit.
Step 3 Edit the view.
- Add a remote device: Double-click a remote device in the resource pool, or drag the remote device to an unoccupied layout grid on the view window, and then click OK.
- Delete a remote device: Point to a video window, and then click ✗ at the upper-right corner, and then click OK.
- Move the video windows: Drag a video window to a proper position and then release the mouse, and then click OK.
- Change window positions: Drag a video window to another video window, and then click OK

When adjusting the positions of video windows, drag the video window to the layout grid whose background color is green. You cannot drag the video window to the grid of red background color.
- Change the window size: Drag the edges of the video window to adjust its size, and then click OK.
- Save the view as a new one: Change the view name in View1 and then click OK
5.1.1.2.3 Opening a View
Right-click the view and select Open, or double-click a view to open the view window.
Figure 5-4 View window

When opening the view, you can change video position, zoom video window.

- When adjusting the positions of video windows, drag the video window to the layout grid whose background color is green. You cannot drag the video window to the grid of red background color.
- Point to the video window. The taskbar is displayed. You can take a snapshot, enable recording and close the video window.
- Right-click the video window, you can switch bit streams, set digital zoom and more.
Table 5-4 View function
| Operation Description | |
| Change window position | Drag a video window to another video window, and then click OK.The change in the window positions is valid only once. After you close and then open the view again, the view restores its original layout. If you want to change view window positions permanently, go to the view edit mode to set. |
| Zoom in video window | When there are more than 9 video windows, click one video window to display it at the center of all windows in the zoom in mode. Click any other blank position to restore the original size.Double-click a view window to display it in one-split mode. Double-click the view window again to restore the original layout. |
| Add device to view window | In the resource pool, double-click a remote device or drag a remote device to a video window to add a remote device to the current view.Drag a remote device to an occupied video window to replace the original remote device.The modified view layout is valid only once if you do not click OK.After you close and then open the view again, the view restores its original layout. |
| Close view window | Point to one video window, and then click☒After you close a video window, the system automatically adjusts window layout according to the rest number of remote devices and the available display space. |
5.1.1.3 View Window
Log in to the PC client, under the Live tab, right-click a view and then select Open, or double-click view to open the view window.
Figure 5-5 View window

natural_image
Interior view of a lab or workshop with equipment and a computer monitor, no visible text or symbols5.1.1.3.1 Taskbar
Log in to the PC client, under the Live tab, open a view and then point to a video window. The taskbar is displayed.
Figure 5-6 View window

natural_image
Interior view of an office with equipment and a large pixelated screen (no visible text or symbols)Table 5-5 Window taskbar
| Icon Description | |
| [SWBX] | Zoom. Click the icon, and then select a zone on the video window to zoom in. |
![]() | Talk. The Talk function enables voice interaction between the Device and remote devices. |
![]() | Instant record. Clickbecomes [IMAGE]. Click [IMAGE] to stop recording.The system stops recording according to the configured instant recording length if you do not click [IMAGE] to stop.The video storage path varies on different interfaces.Local interface.When a USB storage device is connected, the videos are saved to the USB storage device.Otherwise, the videos are saved on the Device. You can search for and export videos under theSearchtab.PC client.The default storage path of videos is C:/Program Files (x86)/PCAPP/video. |
| Manual snapshot.The snapshot storage path varies on different interfaces.· Local interface.◇ When a USB storage device is connected, snapshots are saved to the USB storage device.◇ Otherwise, the snapshots are saved on the Device. You can search for and export videos under the Search tab.· PC client.The default storage path of snapshots is C:/Program Files (x86)/PCAPP/pictures. | |
| Close the window. |
5.1.1.3.2 Shortcut Menu
Log in to the PC client, under the Live tab, open a view and then right-click a video window. The shortcut menu is displayed.

The shortcut menu might vary depending on the remote devices.
Figure 5-7 Shortcut menu

Table 5-6 Shortcut menu description
| Parameter Description | |
| Switch Stream | Select a stream type fromMain Stream, Sub Stream 1andSub Stream 2. |
| Bit Rate | Select whether to display the real-time bit rate on the upper-left corner of the video window. |
| Original | Set video window scale.ON: The system automatically adjusts video window scale according to the resolution.OFF: The system automatically adjusts video window scale according to the number of remote devices and the available display space. |
| Audio | Set an audio output mode from Audio 1, Audio 2, Mixing and Close. |
| Fisheye Dewarp | Set installation methods and display modes of fisheye cameras.This function is only available on fisheye camera. |
| Crowd Distribution Map | Enable the crowd distribution map to view and monitor crowd density. |
| Smart Tracking | Intelligently track targets.This function is only available on the multi-sensor panoramic camera + PTZ camera. |
5.1.1.3.3 Digital Zoom
The digital zoom function allows you to zoom in a specified zone to view the video details.
Log in to the PC client, open a view under the Live tab, and then you can zoom in the video window in either of the following ways.
- Point to the center of the zone that you want to zoom in or zoom out, and then scroll the mouse to zoom in or zoom out.
- Click ☐, select a zone on the video window. The zone is enlarged. Release the mouse to restore the original effect.
5.1.1.3.4 Fisheye Dewarp
Set the installation method and display mode of fisheye cameras.

This function is available on select models.
Procedure
Step 1 Log in to the PC client.
Step 2 Under the Live tab, open a view.
Step 3 Right-click on the live video, and then select Fisheye Dewarp.
Step 4 Select an installation method.
- Click to select ceiling mount.
- Click to select wall mount.
- Click to select ground mount.
Step 5 Select a display mode.
Table 5-7 Display mode
| Installation Method | Display Mode | Description |
| Ceiling/wall/ground mount | The original fisheye image. | |
| Ceiling/ ground | 1P+1 Corrected | 360° panoramic image + section images. |
| mount | 2P | 2 corrected 180° images that together constitute a 360° panoramic image. |
| 1+3 Original image + 3 section images. | ||
| 1+4 Original image + 4 section images. | ||
| 1P+6 | Corrected 360° panoramic image + 6 section images. | |
| 1+8 Original image + 8 section images. | ||
| Wall mount | 1P | Corrected 180° image from left to right. |
| 1P+3 | Corrected 180° image + 3 section images. | |
| 1P+4 | Corrected 180° image + 4 section images. | |
| 1P+8 | Corrected 180° image + 8 section images. |
Step 6 Click OK.
5.1.1.3.5 Smart Tracking
Track targets manually or automatically. This function is only available on the multi-sensor panoramic camera + PTZ camera.

Make sure that the linked tracking function has been enabled.
Procedure
Step 1 Log in to the PC client.
Step 2 Under the Live tab, open a view.
Step 3 Right-click the live video, and then select Smart Tracking > ON.
Step 4 Select the tracking method.
- Manual positioning: Click a spot or select a zone on the bullet camera video, and then the PTZ camera will automatically rotates there and zoom in.
- Manual tracking: Click or select a target on the bullet camera video, and then the PTZ camera automatically rotates and tracks it.
- Automatic tracking: The tracking action is automatically triggered by tripwire or intrusion alarms according to the pre-defined rules.
5.1.1.3.6 Thermal
Log in to the PC client. Under the Live tab, a thermal camera has 2 channels by default: visible light channel and thermal channel.
Select the thermal channel, point to any position on the live video, and then you can view the real-time temperature of the position.
Figure 5-8 Thermal

5.1.1.3.7 Talk
The Talk function enables voice interaction between the Device and remote devices, improving the efficiency in handling emergency events.
Procedure
Step 1 Log in to the PC client.
Step 2 Open a view under the Live client.
Step 3 Click ↓ at the upper-right corner of the view window to enable the Talk function. Click again to disable the function.
5.1.2 Device Tree
Log in to the PC client. The device tree on the upper-left corner of the Live tab displays the added remote devices, which are grouped automatically according to device type.
Figure 5-9 Device tree

Table 5-8 Device tree description
| Operation Description | |
| Search for devices | Enter keywords in .QSupport fuzzy search. |
| Filter devices | Click and then select All, Online, Offline, Device mismatch and Incorrect Username or Password to filter the remote devices.Device mismatch refers to the situation where the remote device is not compatible with EVS due to inconsistent languages. |
| View device status | If the icon of the remote device is black, the remote device is online.For example, IP PTZ CameraIf the icon of the remote device is red, the remote device is offline. For example, . 1-IPCIf appears, the remote device is abnormal, alarming, and more. Point to view the detailed information. |
| Mouse operations | Point to the name of a remote device and then you can view its IP address and port number.Right-click a remote device to connect, disconnect, and open the webpage of the remote device.Double-click a remote device or drag the remote device to a video window, and then you can enter edit the view. |
5.1.3 PTZ
Log in to the PC client. Use the PTZ panel at the lower-left corner of the Live tab to perform PTZ control so that the PTZ camera can rotate accordingly to monitor all directions.

The PTZ functions might vary depending on the device models.
Figure 5-10 PTZ

Table 5-9 PTZ control panel
| Icons Description | |
| Drag to set PTZ speed. The higher the value, the faster the PTZ speed. | |
| Control PTZ movement in the following ways.• Drag in different directions to control the PTZ direction.• Click the arrows to control the PTZ direction. | |
| Click to enable 3D positioning function. | |
| Click to enable auto focus, and then the camera image becomes focused automatically. | |
| Click to enter the PTZ menu mode. |
| Icons Description | ||||
![]() | ![]() | Zoom. Click to adjust lens zoom rate of the remote device. | ||
![]() | ![]() | Focus. Click to adjust lens focus of the remote device. | ||
![]() | [3DGH] | Iris. Click it to adjust iris size of the remote device. | ||
| [head] | Click to use windshield wiper. : Click to enable windshield wiper. | |||
| [ST8A] | [SZZ6] | [WT06] | ![]() | Click to use PTZ functions. : preset. : tour group. : pattern. : scan. |
5.1.3.1 PTZ Menu Settings
Device displays PTZ main menu on the view window. The PTZ main menu enables you to perform camera settings, PTZ settings, system management, and more. You can use the direction and confirm buttons to set the remote device.
Procedure
Step 1 Log in to the PC client.
Step 2 Under the Live tab, open a view and then select a remote device on the view.
Step 3 On the PTZ panel, click 📋 to open the OSD menu.
Figure 5-11 PTZ menu

Table 5-10 PTZ menu description
| Parameter Description | |
| Camera | Set camera parameters of the remote device including picture, exposure, backlight, WB, day and night, focus and zoom, defog, and default. |
| PTZ | Set PTZ functions of the remote device such as preset, tour group, scan, pattern, rotation, and PTZ restart. |
| System | Configure system settings of the remote device. You can set PTZ simulator, restore default, manage peripheral devices of the remote device, view the software version and PTZ version of the remote device, and more. |
| Exit Exit the PTZ menu. |
Step 4 Set PTZ menu parameters.
- Click ▲ or ▼ to select options.
- Click ▶ or ◀ to set values.
- Click to confirm.
Step 5 Click ☐ to exit PTZ menu mode.
5.1.3.2 Configuring PTZ Functions
Control PTZ device to implement corresponding operations.

The PTZ functions might vary depending on the device models.
5.1.3.2.1 Setting a Preset
A preset is the saved information of a specific position, angle, and focal length of the PTZ camera. You can set a preset so that you can quickly adjust the PTZ to the desired position when needed.
Procedure
Step 1 Log in to the PC client.
Step 2 Under the Live tab, open a view.
Step 3 Select the video window of a PTZ camera.
Step 4 On the PTZ panel, click .

Figure 5-12 Call a preset

Step 5 Click the direction icons to rotate the PTZ camera to a specific position.
Step 6 Click +, enter the name of the new preset, and then click √ to save the preset.
Step 7 Execute the preset.
1) Hover over the preset name.
2) Click 📋 next to the preset name. The PTZ camera rotates to the preset point.
Related Operations
- Edit a preset:
Double-click the name, and then the camera rotates to the preset after the double-click. You can change the name,
Select the preset, click ✉ to adjust the position of the preset, and then click √.
◇ Click to quit.
- Select a preset and then click 📋 to delete it.
- Click C to refresh the preset list.
5.1.3.2.2 Setting a Tour Group
A tour group is a sequential set of presets. When a tour group is used, the PTZ camera automatically rotates to the presets one by one at the predefined interval.
Procedure
Step 1 Log in to the PC client.
Step 2 Under the Live tab, open a view.
Step 3 Select the video window of a PTZ camera.
Step 4 On the PTZ panel, click.
Step 5 Click +, enter the name of the new tour group, and then click √ to save.
Step 6 Click Add, select a preset, and then click. √
Repeat this step to add multiple presets into the tour group.
Step 7 Execute the tour group.
1) Hover over the name of the tour group.
2) Click ▶ next to the name of the tour group. The PTZ camera rotates to the preset point in the configured sequence.
3) Click □ to stop the PTZ tour.
Related Operations
- Edit a tour group:
◇ Double-click a tour group to rename it.
Select the tour group, click ✉ to modify the tour group, and then click √.
◇ Click to quit.
- Select a tour group and then click to delete it.
- Click C to refresh the list of tour groups.
5.1.3.2.3 Setting a Pattern
A pattern is a recorded series of PTZ operations such as pan, tilt, zoom and focusing. You use a pattern to let the camera repeat the corresponding operations.
Procedure
Step 1 Log in to the PC client.
Step 2 Under the Live tab, open a view.
Step 3 Select the video window of a PTZ camera.
Step 4 On the PTZ panel, click.
Step 5 Double-click the name of a pattern, click Start Record, perform a series of PTZ actions, and then click Stop Record.
Step 6 Execute the pattern.
1) Hover over the name of the pattern.
2) Click 📋 next to the name of the tour group. The PTZ camera executes the actions in the pattern.
3) Click □ to stop the PTZ actions.
Related Operations
- Edit a pattern
- Select a pattern and then click 🔒 to delete it.
- Click C to refresh the list of patterns.
Select the pattern, and then click .Click Start Record and record a new pattern, and then click Stop Record.
5.1.3.2.4 Setting a Scan
In the linear scanning mode, the camera scans repeatedly from side to side within the predefined left and then right limit.
Procedure
Step 1 Log in to the PC client.
Step 2 Under the Live tab, open a view.
Step 3 Select the video window of a PTZ camera.
Step 4 On the PTZ panel, click .
Step 5 Double-click the name of a scan, rotate the PTZ to the desired left and then click ◄ to save; rotate the PTZ to the desired right limit and then click ▶

The maximum number of scans depends on the camera capability. If the camera permits, you can configure up to 5 scans by default.
Step 6 Execute the scan.
1) Hover over the name of the scan.
2) Click ▶ next to the name of the scan. The PTZ camera executes the scan.
3) Click □ to stop the scan.
Related Operations
Edit the scan.
- Select a scan, and then click .
- Rotate the PTZ camera to a new left limit, and then click ◄.
- Rotate the PTZ camera to a new right limit, and then click ▶I.
5.1.3.2.5 Enabling Auxiliary Functions
Enable PTZ windshield wiper, light and IR.
Procedure
Step 1 Log in to the PC client.
Step 2 Under the Live tab, open a view.
Step 3 Select the video window of a PTZ camera.
Step 4 On the PTZ panel, click .
Step 5 Click ☐ to enable the function.
5.2 Recorded Files
You can search for, play back, export the recorded videos or images, and more.
5.2.1 Playing back Recorded Videos
Search for and play back recorded videos according to remote device, recording type, and recording time.
Procedure
Step 1 Log in to the PC client.
Step 2 Select Search on the home page.
Step 3 Select one or more remote devices, and then click the Record tab.

Click :≡ to display only channels. Click 📋 to display channels and devices.
Step 4 Select a recording type.
• All Videos: All videos.
- Instant Record: Videos of instant record.
• Video Detection: Videos linked with video detection.
- External Alarm: Videos linked with internal and external alarms.
• Thermal: Videos linked with thermal alarms.
Step 5 Select a stream type from Main Stream and Sub Stream.
Step 6 Set the search period.
Step 7 Click Search.
The search results are displayed. You can select Timeline Playback or File Playback to play back the videos.
- Timeline playback: Play back videos automatically.
- Place the mouse on the time axis of Timeline Playback to display the thumbnails of 9 frames before and after the current time node. Click the corresponding thumbnail to play the video of the node.
- File playback: The videos files are displayed by channel or by time. Click a file to play back.

◇ You can click ↗ to divide a video into multiple splices that are equally long.
Select Only locked videos on the upper-right corner of the File Playback tab to
display locked videos only.
Click or on the upper-right corner of the File Playback tab to switch the display mode of the video files.
Figure 5-13 Timeline playback

Figure 5-14 File playback

Table 5-11 Search icons description
| Signal Words Description | |
| All | Global control. Click the icon to control several windows simultaneously, such as fast forward or stop the playback of several videos at the same time.Click the icon again to cancel global control. |
| 2022-08-05 10:04:10 | Set a time period. Click to start playing the videos in the configured time period.When you play back several videos at the same time, click the icon to switch to time synchronization mode. All other windows play the video of the same time of current window.Clickto cancel time synchronization.When you click,the system enables operation synchronization as well. If you want to cancel synchronization, click. |
| Play back video file at a slow speed.The slow speed includes1/2,1/4,1/8, and1/16. Click the icon once, and then the playback speed becomes one level slower. | |
| Play the previous frame.The function is only available in pause mode. | |
| Click to play backward. The icon becomesII . ClickII to stop backward play. | |
| Click to start playback. The icon becomesII . ClickII to pause playback. | |
| Play the next frame.The function is only available in pause mode. | |
| Play back at a fast speed.The fast speed includes 1, 2, 4, 8, and 16. Click the icon once, the playback speed becomes one level faster. | |
| Select a playback speed. | |
| Capture an image. | |
| Add tags to mark important points in time on the video. | |
| Clip one part of the video, and then save it in designated storage path. | |
| Click the icon and then drag the slider to adjust the volume. | |
| Play back at full screen. | |
| — | Time bar. Displays recording type and recording period.There are 2 recording file bars on the time bar. The top bar displays recording time of selected window. The bottom bar displays recording time of all selected remote devices.The time bar uses different colors to categorize record types.Green: regular recording.Red: alarm recording.Blank: no recording.: The time scale displays recording date and time, which changes automatically during the playback process.On the time bar, you can:Click the time bar and scroll your mouse to adjust the time accuracy.Drag the time bar to the left or right to view the hidden recording time. |
![]() | Right-click the playback window to bring up the shortcut menu.Original: Set video window scale.On: The system automatically adjusts video window scale according to the video resolution.Close: The system automatically adjusts video window scale according to the number of remote devices and the available display space.Audio: Set audio output.Fisheye: Set the installation method and display mode of fisheye camera. |
| [IMAGE] | Extract the fram when the network playback speed is more than 4x. |
| [IMAGE] | Close the playback window. |
5.2.2 Clipping a Video
Clip one part of the recorded video, and save it to the designated storage path.

Connect a USB device to the Device if you are operating on the local interface.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Search.
Step 3 Search for recorded videos and then play back a video.
Step 4 Click . [+]
Figure 5-15 Clip a video

Step 5 Drag the left and right edges of the blue frame to select the start time and end time of clipping.
Step 6 Click OK.
Step 7 Select a file format, and then click Browse to select the storage path.
Figure 5-16 Save the video

Step 8 Click OK.
5.2.3 Video Tag
During playback, you can add a tag to mark an important point in time on the video. After playback, you can use time or the tag keywords to search for the corresponding video and then play.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Search.
Step 3 Search for videos and play back a video.
Step 4 During playback, click ✝ at the lower-right corner of the playback window.
Step 5 Enter tag name, and then click OK.
Related Operations
You can search for and manage tagged files.
- Log in to the PC client.
- On the home page, select Search > Tag Management.
- Select one or more channels, enter keywords, and then set the search period.
4. Click Search.
- Click ▶ to view the corresponding video.
- Click to edit the tag.
- Click to delete the tag.
- Select multiple tags and click Delete to delete the tags in batches.
- Click Refresh to refresh the tag list.
Figure 5-17 Tags

5.2.4 Searching for Snapshots
Search for and view snapshots according to remote device, image type, and snapshot time.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Search.
Step 3 Select a remote device, and then click the Picture tab.
Step 4 Select an image type.
• Manual Snapshot: Manual snapshots.
• Video Detection: Snapshots linked with video detection.
- External Alarm: Snapshots linked with internal and external alarms.
• Thermal: Snapshots linked with thermal alarms.
Step 5 Set the search period.
Step 6 Click Search.
5.2.5 Backing up Files
Back up videos or images by downloading or remote backup.

Connect a USB device to the Device if you are operating on the local interface.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Search.
Step 3 Search for videos or images.
Step 4 Under the File Playback tab, select one or more files to back up.
- Download.
-
Click . ↓
-
Select a file type.
-
Click Browse to select the storage path. You can download files to your computer or a USB storage device.
-
Click OK.

Select Combined Video to merging and download several video clips.
- Remote backup.
-
Click .
-
Click Search to search for connected third-party storage devices.
-
Select a storage device, and then select a file format.
-
Click Format to format the selected storage device.

Please be advised that formatting the storage device will clear all data on it.
- Click Start.

Make sure that an external HDD or disk array enclosure has been connected to the eSATA port of the Device.
5.2.6 Locking Files
Lock specific videos or snapshot so they will not be overwritten.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Search.
Step 3 Search for videos or snapshots
Step 4 Under the File Playback tab, select one or more search results and then click
The files are locked. Select the locked files and then click 🔍 to unlock them.

5.2.7 Watermark Verification
Verify whether a video file is tempered.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Aux > Watermark.
Step 3 Click Browse to select a video file.
Step 4 After the file is uploaded, click Parity.
- Normal: If the verification result is normal, the correct watermark is displayed.
- Error: If the verification result is abnormal, the abnormal watermark and its type are displayed.
5.3 Alarm List
Log in to the PC client. Click 📄 on the upper-right corner to display the alarm list. You can view the name of alarm device, alarm time and alarm type.
Figure 5-18 Alarm list
| 2-11 03:20:23 | Motion | ✓ |
| 2-11 03:20:03 | Motion | ✓ |
| 50-94 03:19:21 | Motion | ✓ |
| 2-11 03:19:05 | Motion | ✓ |
| 2-11 03:18:44 | Motion | ✓ |
- The number on the icon 📄 is the number of unprocessed alarm events. The alarm list displays up to 200 unprocessed alarm events.
- Click √ to confirm the alarm event. The confirmed event will be removed from the alarm list.
5.4 Display Management
Enable connected monitors or lock the screen.
5.4.1 Multiple-screen Control
The Device can connect to multiple monitors at the same time. You can select a monitor you want to use.

- The multiple-screen control function only available on the local interface.
- Go to System > General > Display to enable a monitor or set its resolution.
- The page might vary depending on the number of the connected monitors.
Click 📄 on the local interface.
- The 1–3 monitors represent monitors connected to HDMI 1–HDMI 3. The main screen refers to the monitor connected to VGA or HDMI 1 port. The monitors connected to the HDMI 2 and HDMI 3 are the sub screens. The main screen and sub screen display different content and support
different resolutions and refresh intervals.
- VGA and HDMI 1 output the same video source. The 3 HDMI ports can output different video sources.
- means connected and enabled monitor. - means connected but not enabled monitor.
- Click to enable the monitor. The main screen is enabled by default and cannot be disabled.
5.4.2 Locking the Screen
Log in to the PC client. Click and then select
Lock. The screen is locked at the current page.
If you want to unlock the screen for more operations, click any position on the screen, enter the password of the current account or use another account to log in.
5.5 System Messages
Log in to the PC client, and then click

on the upper-right corner to view system messages
including system errors, system alarms and system notifications.
Figure 5-19 System messages

- Click All, System Error, System Warning, or System Notifications to view the corresponding system messages.
- Click ☐ to delete the corresponding system message.
- Click Clear to clear all system messages under current tab. For example, you can click Clear under the All tab to clear all system messages, or click Clear under the System Error tab to clear all system error messages.
5.6 Background Task
View the status of the tasks running in the background.
Log in to the PC client, and then click

to display the background tasks. Click All, In progress, or
Waiting to view the background tasks of different statuses.
5.7 Buzzer
Log in to the PC client, and then click 📄 to view buzzer alarm messages.
5.8 Audio Management
Upload and manage audio files that the Device plays when an alarm event occurs.

- You can upload .pcm, .mp3, .wav,and .aac files.
- A single audio file must not be less than 2 KB and must not exceed 10 MB.
- The total size of imported audio files must not exceed 200 MB.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select File Management > Audio.
Step 3 Import audio files to the remote devices.
- Click Import.
- Select an audio file and then click Open.
Step 4 Click Import to select the audio files that you want to import.
Step 5 Click OK.
Related Operations
- Rename the audio file.
Click Edit in the Edit column, enter the new name, and then click OK.
- Delete the audio file.
◇ Delete one by one: Click Delete next to Edit.
Delete in batches: Select one or more files, and then click Delete next to Import.
6 System Configuration
This chapter introduces system configurations such as managing remote device, user information, and HDD storage, and setting network, alarm events, security strategy, and system parameters.
6.1 Device Management
Log in to the PC client, click 📋 on the upper-right corner and then click Camera, or click Camera from the configuration list on the home page. You can add remote devices, modify their IP addresses and configurations, and export their information. You can view the online status and recording status of the device.
Figure 6-1 Camera


Click + on the lower-left corner or click Add to add remote devices to the Device.
6.1.1 Viewing Remote Devices
View connected remote devices. For details on adding devices, see "3.5.2 Adding Remote Devices".
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner of the page and then click Camera.
You can also click Camera from the configuration list on the home page.
Step 3 Select the root node in the device tree, and then under the Camera tab, you can view the remote devices added to EVS.
Figure 6-2 Device list

Step 4 View details on the connected devices, including IP address, serial number, connection
status, and more.
• indicates that the remote device is offline.
• indicates that the remote device is online.
• indicates that the connection with the remote device failed.

You can click ▼ to filter the remote devices.
6.1.2 Changing IP Address
Modify IP address of the remote devices that are connected or not connected to the Device.
6.1.2.1 Modifying IP of Unconnected Devices
Procedure
Step 1 Log in to the PC client.
Step 2 Click 📷 on the upper-right corner of the page and then click Camera.
You can also click Camera from the configuration list on the home page.
Step 3 Under the Camera tab, click Add.
You can also click Add under the device tree.
Figure 6-3 Camera

Step 4 Under the Quick Add tab, click Start Search.
You can click 📋 to filter the search results.
Figure 6-4 Search results

bar
| Initialization | Address | Device Model | Manufacturer | Port | Product ... | SN | Operation | | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | | Initialized | [16ZG] | Onvif | 80 | -- | -- | [icon: 🌐] | [icon: 🌐] | | Initialized | [204I...] | Onvif | 80 | IPC | -- | [icon: 🌐] | [icon: 🌐] | | Initialized | [12HV...] | Onvif | 80 | IPC | -- | [icon: 🌐] | [icon: 🌐] | | Initialized | [T46...] | Onvif | 80 | IPC | -- | [icon: 🌐] | [icon: 🌐] | | Initialized | [50116] | Private | 37777 | [icon: 🌐] | 1.000.0000... | [icon: 🌐] | [icon: 🌐] | | Initialized | [50116] | Private | 37777 | [icon: 🌐] | 1.000.0000... | [icon: 🌐] | [icon: 🌐] | | Initialized | [50116] | Private | 37777 | [icon: 🌎] | 1.000.0000... | [icon: 🌐] | [icon: 🌐] | | Initialized | [50116] | Private | 37777 | [icon: 🎋] | 1.000.0000... | [icon: 🌐] | [icon: 🌐] | Total 202 items < 1 2 3 4 5 > 50 / page Go to Page Remaining Bandwidth/Total Bandwidth: 0Mbps/512Mbps OK CancelStep 5 Select one or more remote devices and then click Modify IP.

- You can only modify the IP address of initialized devices.
- You can only modify the IP address of remote devices that are using the private or ONVIF protocol.
Step 6 Enter the static IP address, subnet mask, gateway, username and password of the remote device, and then click Next.

- Enter incremental value only when you want to change IP addresses of several devices at the same time. The system will allocate IP address one by one with the fourth part of the IP address increasing by the incremental value.
- If an IP conflict occurs when you change the static IP address, the system will notify you of the issue. When an IP conflicts happens when you are changing IP addresses in batches, the system automatically skips the conflicted IP and begins the allocation according to the incremental value.
- If you want to change IP addresses of multiple remote devices, make sure that they share the same username and password.
Figure 6-5 Modify IP (1)

Step 7 Click OK.
6.1.2.2 Modifying IP of Connected Devices

- You can only modify the IP address of initialized devices.
- You can only modify the IP address of remote devices connected through Private, Onvif or Onvifs protocol.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner of the page and then click Camera.
You can also click Camera from the configuration list on the home page.
Step 3 Under the Camera tab, select one or remote devices, and then click Modify IP.

- You can only modify the IP address of initialized devices.
- You can only modify the IP address of remote devices that are using the private or ONVIF protocol.
Step 4 Enter the static IP address, subnet mask, gateway, username and password of the remote device, and then click Next.

- Enter incremental value only when you want to change IP addresses of several devices
at the same time. The system will allocate IP address one by one with the fourth part of the IP address increasing by the incremental value.
- If an IP conflict occurs when you change the static IP address, the system will notify you of the issue. When an IP conflicts happens when you are changing IP addresses in batches, the system automatically skips the conflicted IP and begins the allocation according to the incremental value.
- If you want to change IP addresses of multiple remote devices, make sure that they share the same username and password.
Figure 6-6 Modify IP (2)

Step 5 Click OK.
6.1.3 Configuring Remote Devices
Set the attributes, video parameters and other parameters of remote devices connected to EVS.

The pages might vary with remote devices.
6.1.3.1 Configuring Attributes of Remote Devices
Set the name of remote devices, and view information on the remote devices.
Procedure
Step 1 Log in to the PC client.
Step 2 Click 📋 on the upper-right corner of the page and then click Camera.
You can also click Camera from the configuration list on the home page.
Step 3 Select a remote device from the device tree and then click the Attribute tab.
You can view information on the remote device, such as its model, MAC address, system
version, and more.
Step 4 (Optional) Change the name of the remote device, and enter descriptions for the remote device, and then click Save.
6.1.3.2 Managing Video Channels of Multichannel Devices
When the connected remote device has multiple video channels, you can add or delete the video channels connected to the Device.
Procedure
Step 1 Log in to the PC client.
Step 2 Click 📋 on the upper-right corner of the page and then click Camera.
You can also click Camera from the configuration list on the home page.
Step 3 Select a multichannel remote device from the device tree and then click the Connection tab.
You can view the video channels under the group.
Step 4 Add or delete the video channels.
- Add video channels.
Click Add Video Channel to add more video channels to the group.
- Delete video channels.
Delete one by one: Click Delete under Operation to delete the corresponding video channel.
Delete in batches: Select one or more video channels, and then click Delete Video Channel.
6.1.3.3 Configuring Video Parameters
Set different video parameters according to different bit stream types based on the bandwidth.
Procedure
Step 1 Log in to the PC client.
Step 2 Click 📋 on the upper-right corner of the page and then click Camera.
You can also click Camera from the configuration list on the home page.
Step 3 Select a remote device from the device tree and then click the Video tab.
You can view information on the remote device, such as its model, MAC address, system version, and more.
Step 4 Select a remote device from the device tree and then click the Video tab.
Figure 6-7 Video

Step 5 Set the parameters under the Main Stream, Sub Stream 1 and Sub Stream 2 tab.
This section uses configuration for the main stream as an example.
1) Click to enable SVC, and then select 1 or 2 from the drop-down list on the right. SVC refers to the scaled video coding, which can split the video stream to basic stream and enhanced scale. If you select 1, there is no scaled encoding.

This function is available when the encoding mode is H.264, H.264B or H.264H.
2) Configure the quality parameters of general videos.
Table 6-1 General video parameters
| Parameter Description | |
| Encode mode | Select a video encoding mode.H.264: A highly compressed video encoding standard. It includes H.264B (baseline profile encode mode), H.264 (main profile encode mode) and H.264H (high profile encode mode). Under the same image quality, the bandwidth of the three decreases in turn.H.265: A new video encoding standard coming after H.264. Under the same image quality, it requires smaller bandwidth than H.264. |
| Encoding Strategy | General: Use general coding strategy.Smart Codec: Enable this function to enhance performance of video compression and reduce required storage space. |
| Resolution | Set video resolution. The higher the resolution, the better the video quality.Different models of remote devices support different resolutions. See the actual page for detailed information. |
| Frame Rate | Set the number of frames displayed each second. The higher the FPS, the more vivid and fluent the video. |
| Stream Mode | Select a stream mode.CBR: The bit rate changes slightly around the defined value. We recommended you select CBR when there might be only small changes in the monitoring environment.VBR: The bit rate changes with monitoring scenes. Select VBR when there might be big changes in the monitoring environment. |
| Quality | Select a video quality level fromLow, Medium, and High.This parameter is available only when the stream mode is VBR. |
| Bit Rate | Set video bit rate.Main stream: Select a value or enter a customized value for bit rate. The bigger the value, the better the image quality.Sub stream: In CBR mode, the bit rate changes around the defined value. In VBR mode, the bit rate changes along with the video image, but its maximum value stays near the defined value. |
| I Frame Interval | Set the number of P frames between 2 I frames. The lower the value, the better the video quality. The recommended value is 2 times of the frame rate. |
3) Click Quality of Event Video, and then set frame rate, stream mode, and bit rate for event videos.

The Quality of Event Video section is available only for main stream.
Step 6 Click Save.
6.1.3.4 Configuring OSD
Set OSD information on the video.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner of the page and then click Camera.
You can also click Camera from the configuration list on the home page.
Step 3 Select a remote device from the device tree and then click the OSD tab.
Figure 6-8 OSD

Step 4 Configure OSD information.
- Device name.
- Click to enable OSD of device name.
- Click .
- Enter the device name.
- Drag the text box to the proper position.
• Time.
- Click to enable OSD of time.
- Click .
- Drag the text box to the proper position.
• Geographical position
- Click to enable OSD of geographical position.
- Click .
- Enter the geographical position information.


- Drag the text box to the proper position.
Step 5 Click Apply.
6.1.3.5 Configuring Audio Parameters
Procedure
Step 1 Log in to the PC client.
Step 2 Click 📋 on the upper-right corner of the page and then click Camera.
You can also click Camera from the configuration list on the home page.
Step 3 Select a remote device from the device tree and then click the Audio tab.
Figure 6-9 Audio

Step 4 Select an audio output type.
- Lineln: The Device acquires audio signals through the external audio device.
- Mic: The Device acquires audio signals through internal microphone.
Step 5 Click to enable Noise Filter.

This function is available with select models of remote devices.
Step 6 Click the Main Stream, Sub Stream 1 or Sub Stream 2 tab, and then configure the parameters.
Table 6-2 Audio parameters
| Parameter Description | |
| Audio Encoding | The audio encoding mode applies to both audio streams and voice talks. We recommend leaving it as default. |
| Sampling Frequency | The number of samples of a sound that are taken per second. The higher the value, the more accurate the digital representation of the sound can be. |
Step 7 Click Apply.
6.1.4 Configuring Connection Information
Set connection information of remote devices, such as the connection type and IP address.
Procedure
Step 1 Log in to the PC client.
Step 2 Click 📋 on the upper-right corner of the page and then click Camera. You can also click Camera from the configuration list on the home page.
Step 3 Select the root node in the device tree, and then click the Camera tab.
Figure 6-10 Device list

Step 4 Click Edit. You can view the connection information of the remote device such as manufacturer, IP address and TCP port, and configure its connection type and cache method.
Table 6-3 Connection parameters description
| Parameter Description | |
| Password | Enter the password of the remote device. |
| Connection Type | Select a connection type for the system and remote device. It is self-adaptive by default. |
Step 5 Click Save.
6.1.5 Exporting Remote Devices
Export the added remote devices. When the Device restores factory default settings or lost information of remote devices, import the exported information of remote devices to recover quickly.
Procedure
Step 1 Log in to the PC client.
Step 2 Click 📋 on the upper-right corner of the page and then click Camera. You can also click Camera from the configuration list on the home page.
Step 3 Click ↑ under the device tree or Export under the Camera tab.

Click Download Template to download the template. You can use the template to import remote devices.
Figure 6-11 Export

Step 4 (Optional) Click to enable export encryption. The function is enabled by default. The exported .backup file is encrypted and cannot be edited. If do not enable encryption, the system exports .csv file, which can be opened with Excel. The exported .csv file contains IP address, port number, channel number, channel name, manufacturer and username (excluding password) of the remote device.

When unencrypted file is exported, keep the file safe to avoid data leakage.
Step 5 Click OK.
Step 6 Click Save File.
File path might be different depending on your operations.
- On the PC client, click, select Download to view the file storage path.
- On the local interface, you can select a file storage path.
- On the web interface, files are saved to the default downloading path of the browser.
6.1.6 Importing Remote Devices
Log in to the PC client. Click 📋 on the upper-right corner of the page and then click Camera. Click Batch Import to import remote devices. For details, see "3.5.2.4 Batch Add".
6.1.7 Connecting Remote Devices
Log in to the PC client. Click 📋 on the upper-right corner of the page and then click Camera. You can view connection status of remote devices on the device list.
When the icon of the remote device is black, for example, the remote device is online.
When the icon is red, for example 1( )..., the remote device is offline.
- Right-click an offline remote device, and then select Connect to connect the remote device.
- Right-click an online remote device, and then select Disconnect to disconnect the remote device.
- Right-click an online device, and then select Open Device Webpage to go to the web page of the remote device.
6.1.8 Deleting Remote Devices
Log in to the PC client. Click 📋 on the upper-right corner of the page and then click Camera. You can delete the added remote devices one by one or in batches.
- Delete one by one.
Select a remote device from the device tree and then click 📄 under the device tree.
- Right-click a remote device on the device tree and then select Delete.
Under the Camera tab, click Delete next to Edit to delete the corresponding remote device.
- Delete in batches.
Click □ next to the root node on the device tree, select multiple remote devices, and then click .
On the device list under the Camera tab, select a remote device, press Shift and then select another remote device. All remote devices between these two are selected. ClickDelete next to Batch Import to delete them.
On the device list under the Camera tab, select multiple remote devices, and then click Delete next to Batch Import.
6.2 Network Management
Log in to the PC client. Click 📋 on the upper-right corner of the page and then click Network. You can set basic network parameters and applications.
6.2.1 Basic Network
Set basic network parameters of the Device, such as IP address, port aggregation and port number, to make sure the Device can connect with other devices on the network.
6.2.1.1 Configuring IP Address
Set IP address of the Device, DNS server information and other information according to network planning.

Make sure that at least one Ethernet port has connected to the network before you set IP address.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Network.
You can also click Network from the configuration list on the home page.
Step 3 Select Basic Network > TCP/IP.
Step 4 Click ☐ to configure the corresponding NIC.
Step 5 Configure the parameters.
Figure 6-12 Edit Ethernet network

Table 6-4 NIC parameters description
| Parameter Description | |
| Rate (Mbps) | The maximum network transmission speed that the current NIC supports. |
| Type Select IPv4 or IPv6. | |
| Mode | DHCP: When there is a DHCP server on the network, you can enable DHCP. The system allocates a dynamic IP address to the Device.There is no need to set IP address manually.Static: You need to enter the IP address, subnet mask and gateway. |
| Test | Test whether the IP address is valid. |
| MTU | Set NIC MTU value. The default setup is 1500 bytes.We recommend you check the MTU value of the gateway first and then set the MTU value of the Device equal to or smaller than the gateway value, which helps to reduce the packets slightly and enhance network transmission efficiency.[kzxg]Please be advised that changing MTU value might result in NIC restart, network offline and affect current running operation. |
Step 6 Click OK.
Step 7 Set DNS server information.

This step is compulsive if you want to use domain service.
- Select DHCP so that the Device can automatically get the IP address of the DNS server on the network.
- Select Static and then enter the preferred and alternate DNS addresses.
Step 8 Set the default NIC.

Make sure that the default NIC is online.
Step 9 Click Apply.
6.2.1.2 Port Aggregation
Bind multiple NICs to create one logic NIC and use one IP address for peripheral devices. The working mode of bonded NICs work is dependent on the aggregation mode. Port aggregation enhances network bandwidth and network reliability.
The system supports 3 aggregation modes: load balance, fault tolerance, and link aggregation.
Table 6-5 Aggregation mode description
| Aggregation mode Description | |
| Load balance | The Device bonds several NICs at the same time and use one IP address to communicate with other devices. The bonded NICs are working together to bear the network load.The load balance mode adds the network throughput data amount and enhances network flexibility and availability. In this mode, the network is offline when all NICs break down.Make sure that the switch supports link aggregation and you have configured the static aggregation. It will take effect when the forwarding policy is configured as IP+PORT forwarding and aggregation mode asload balance. |
| Fault tolerance | The Device bonds several NICs and use one NIC as the main card and the rest as standby. Usually, only the main NIC card is working. The other standby cards automatically take over the job when the main card breaks down.This mode enhances NIC reliability. In this mode, the network is offline when all NICs break down. |
| Link aggregation | The Device bonds several NICs and all NICs are working together to share the network load. The system allocates data to each NIC according to your allocation strategy. Once the system detects that one NIC breaks down, it stops sending data through this NIC, and transmits the data among the rest NICs. The system calculates transmission data again after the malfunctioning NIC resumes work.In this mode, the network is offline when all bonded NICs break down.Make sure that the switch supports link aggregation and you have configured the LCP type dynamic link aggregation, the link aggregation takes effect when configuring the mode. |
6.2.1.2.1 Binding NICs
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Network.
You can also click Network from the configuration list on the home page.
Step 3 Click 📍 or click + on the configuration page, and then select NETWORK > Basic Network > TCP/IP.
Step 4 Bind NICs.
1) Click NIC Bonding.
2) Select the NICs you want to bind.
3) Select an aggregation mode.
Figure 6-13 NIC bonding

4) Click OK

The setting page varies depending on the aggregation mode you have selected. The following figure is the load balance setting page.
Figure 6-14 Edit load balance

5) Set parameters.
Table 6-6 NIC parameters description
| Parameters Description | |
| Rate (Mbps) | The maximum network transmission speed that the bonded NICs support. |
| IP Type Select IPv4 or IPv6. | |
| Use Dynamic IP Address | When there is a DHCP server on the network, you can enable DHCP. The system allocates a dynamic IP address to the Device. There is no need to set IP address manually. |
| Use Static IP Address | Set a static IP address for the Device. You need to enter a static IP address, subnet mask and gateway. |
| Test | Test whether the IP address is valid. |
| MTU | Set NIC MTU value. The default setup is 1500 bytes.We recommend you check the MTU value of the gateway first and then set the MTU value of the Device equal to or smaller than the gateway value, which helps to reduce the packets slightly and enhance network transmission efficiency.⚠️Please be advised that changing MTU value might result in NIC restart, network offline and affect current running operation. |
6) Click OK.
Step 5 Click Apply.
The system pops up a confirmation box.
Step 6 Click OK.
The configuration of binding NICs takes effect after the Device restarts.
6.2.1.2.2 Cancelling Binding NIC
Cancel port aggregation so that the NICs are no longer bonded and work as independent NICs.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Network.
You can also click Network from the configuration list on the home page.
Step 3 Select a bonded NIC.
Step 4 Click Unbind.
Figure 6-15 Unbind

Step 5 Click Apply.
The system splits the bonded NICs.

Among the split NICs that were bonded together, the first NIC reserves the IP address configured during binding, and the rest NICs restore their default IP addresses.
6.2.1.3 Setting Port Number
Set device port number.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Network.
You can also click Network from the configuration list on the home page.
Step 3 Select Basic Network > Port.
Figure 6-16 Port

Step 4 Configure the parameters.

- When you log in via TCP, you do not need to log in again to make you changes in max connection, RTSP port, and UDP port become effective.
- When you log in by other methods, you need to log in again after you modify the port parameters except max connection.
Log in again after modifying parameters except Max Connection.
Table 6-7 Port parameters description
| Parameter Description | |
| Max Connection | The allowable maximum number of clients accessing the Device at the same time, such as web, PC client, and platform. Select a value between 1 and 128. The default value setting is 20. |
| TCP | Set according to the actual requirements. The default value is 37777. The value ranges from 1025 to 65535. |
| RTSP | Set according to the actual requirements. The default value is 554. The value ranges from 1 to 65535. |
| HTTP | Set according to the actual requirements. The default value is 80. The value ranges from 1 to 65535.If the value you set is not 80, remember to add the port number after the IP address when you are using a browser to log in to the device. |
| HTTPS | Set according to the actual requirements. The default value is 443. The value ranges from 1 to 65535. |
| UDP | Set according to the actual requirements. The default value is 37778. The value ranges from 1025 to 65535. |
Step 5 Click Apply.
The system restarts the corresponding services of the ports.
6.2.2 Network Application
Set the parameters of network applications, so that system can connect to other devices.
6.2.2.1 P2P
P2P is a peer to peer technology. You can scan the QR code to download mobile app without DDNS service or the port mapping or installing the transmission server. After you register the Device to the app, you can view the remote videos, play back recorded videos and more.

- Make sure that the Device has connected to the network.
- To use the P2P function, we will collect information such as IP address, MAC address, and serial number. The collected information is only used for remote access.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Network.
You can also click Network from the configuration list on the home page.
Step 3 Select Network Application > Access Service.
Figure 6-17 P2P

Step 4 Click to enable the P2P function.
Step 5 Click Apply.
You can register the Device to the app for remote monitoring and management. For details, see the corresponding user's manual of the app.
6.2.2.2 Auto Register
Register the Device on a designated proxy server so that client software can access the Device through the proxy server.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Network.
You can also click Network from the configuration list on the home page.
Step 3 Select Network Application > Auto Register.
Figure 6-18 Register

Step 4 Click to enable the function.
Step 5 Set parameters.
Table 6-8 Register
| Parameter Description | |
| Type | Select an IP type from IPv4 and IPv6. |
| IP Address | Enter the IP address of the server that you are registering the Device to. |
| Port | Enter the port number of the server for registration. |
| Device ID | The destination address of the trap information from the agent on the Device. |
Step 6 Click Apply.
6.2.2.3 Email
Configure email information. When an alarm event linked with email occurs, the system automatically sends emails to the user.

Please be advised that device data will be sent to specific servers after the email function is enabled.
Procedure
Step 1 Log in to PC client.
Step 2 Click on the upper-right corner and then click Network.
You can also click Network from the configuration list on the home page.
Step 3 Select Network Application > Email.
Figure 6-19 Email

Step 4 Click to enable the email function.
Step 5 Set parameters.
Table 6-9 Emails parameter description
| Parameter Description | |
| Server | Select a server type from Custom, Gmail, Hotmail, and Yahoo Mail. |
| Server Address | Enter the address of the email server. |
| Encryption | Select an encryption type from NONE, SSL, and TLS.We recommend you select TLS. Other encryption methods might not be safe. |
| Port | Enter the port number of the email server. |
| Attachment | Click to allow the system to send emails with attachments. |
| Username | Enter the configured username and password of the email server. |
| Authentication Password |
Step 6 Add the information of mail receiver.
1) Click Add.
2) Enter the email address of the receiver.
3) Click Add to add more receiver email addresses.
- Click 📋 to delete the added receiver.
- Select a receiver and then click Delete to delete the selected receiver.
Step 7 Click Apply.
Step 8 (Optional) Test the email sending function.
1) In the box next to Test, select or enter a receiver email address.
2) Click. Test
- If the configuration is correct, the system pops up a message of success, and the receiver will receive the test mail.
- Otherwise, the system pops up a message of failure, and the receiver will not receive the test mail.
6.2.2.4 Alarm Center
Configure the alarm center server. After events linked with alarm upload occur, the system uploads alarm information to the alarm center.

Make sure that alarm center server is deployed.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Network.
You can also click Network from the configuration list on the home page.
Step 3 Select Network Application > Alarm Center.
Figure 6-20 Alarm center

Step 4 Click to enable alarm center.
Step 5 Configure the parameters.
Table 6-10 Alarm center parameters
| Parameter Description | |
| IP Type | Select the IP type of the alarm center server. |
| Server Address | The IP address and communication port of the alarm center server. |
| Port | |
| Auto Report Plan | Select time cycle and specific time for uploading alarms. |
Step 6 Click Apply.
6.2.2.5 UPnP
Through the UPnP (Universal Plug and Play) protocol, you can establish a mapping relationship between the LAN and the WAN. The WAN user can use the WAN IP address to directly access the Device on the LAN.
Prerequisites
- Make sure that your computer has been installed with UPnP network services.
- Log in to the router and set the WAN port IP address of router.
- Enable the UPnP function on the router.
- Connect the Device to the LAN port of the router.
- Select Network > Basic Network > TCP/IP, and then set the IP address to the LAN IP of the router, or select DHCP to automatically obtain the IP address.

Please be advised that services and ports of the Device will be mapped to the public network after UPnP is enabled.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Network.
You can also click Network from the configuration list on the home page.
Step 3 Select NETWORK > Network Application > UPnP.
Figure 6-21 UPnP

Step 4 Set parameters.
Table 6-11 UPnP parameters
| Parameter Description | |
| Port Mapping | Click to enable port mapping. |
| Status The status of port mapping. | |
| LAN IP | The LAN IP address of the router.The IP address is automatically obtained after the mapping succeeds. |
| WAN IP | The WAN IP address of router.The IP address is automatically obtained after the mapping succeeds. |
| Port Mapping List | The list is consistent with the UPnP port mapping list on the router.Internal Port: The ports of the EVS to be mapped on the router.External Port: The ports mapped on the router. Click ,and then you can modify the external ports.When setting the external port, use the ports between 1024 and 5000, and do not use the well-known ports 1 to 255 and the system ports 256 to 1023, otherwise conflicts might occur.When there are multiple devices on the LAN, properly plan the port mapping to avoid conflicts in WAN ports.When making a port mapping, make sure that the port you are mapping is not occupied or restricted.The TCP/UDP WAN and LAN ports must be consistent and cannot be modified. |
Step 5 Click Apply.
Enter http://WAN IP: WAN port number in the browser to access the Device with the corresponding port number on the router network.
6.2.2.6 SNMP
After setting SNMP (Simple Network Management Protocol) and successfully connecting the Device through relevant software tools such as MIB Builder, and MG-SOFT MIB Browser, you can directly manage and monitor the Device on the software tools.
Prerequisites
• Install SNMP monitoring and management tools, such as MIB Builder and MG-SOFT MIB Browser.
- Obtain the MIB file corresponding to the current version from technical support.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Network.
You can also click Network from the configuration list on the home page.
Step 3 Select Network Application > SNMP.
Figure 6-22 SNMP

For data security, we recommend V3.
Step 6 Set parameters. For Trap Address, enter the IP address of the computer installed with the MG-SOFT MIB Browser. Leave the other parameters as default.
Table 6-12 SNMP parameters
| Parameter Description | |
| Port | Listening port of agent programs on the device. |
| Read Community, Write Community | Read or Write Community supported by the agent programs. The name can only contain numbers, letters, underscores, and middle lines. |
| Trap Server | The destination address of Trap information sent by the agent program. |
| Trap Port | The destination port of Trap information sent by the agent program. |
| Read-Only User | Set the username the read-only user. The read-only user only has the read-only permission.[SCAC]The name can only contain numbers, letters, and underscores. |
| Authentication Type | You can select the read authentication type between MD5 and SHA. It is MD5 by default. |
| Authentication Password | Enter the read authentication password. The password must contain at least 8 digits. |
| Encryption Type | Set the read encryption type. It is CFB-AES by default. |
| Encryption Password | Set the read encryption password. The password must contain at least 8 digits. |
| Read/Write User | The username is private by default. If you log in using this username, you have the read-and-write permission. The name can only contain numbers, letters, and underscores. |
| Authentication Type | You can select the read-and-write authentication type from MD5 or SHA. It is MD5 by default. |
| Authentication Password | Enter the read-and-write authentication password. The password must contain at least 8 digits. |
| Encryption Type | Select a read-and-write encryption type. Select a CFB-AES by default. |
| Encryption Password | Enter a read-and-write encryption type. The password must contain at least 8 digits. |
Step 7 Click Apply.
6.2.2.7 Multicast
When multiple users are viewing live video of the same device at the same time, it might cause failure due to limited bandwidth. To solve this problem, you can set a multicast IP address (224.100.0.0–239.200.255.255) for the Device.
Procedure
Step 1 Log in to the PC client.
Step 2 Click 📋 on the upper-right corner and then click Network.
You can also click Network from the configuration list on the home page.
Step 3 Select Network Application > Multicast.
Step 4 Click to enable multicast.
Step 5 Set parameters.
Table 6-13 Multicast parameter
| Parameter Description | |
| IPV4/IPV6 | Select an IP type and then enter the IP address Enter the IP address that you want to use as the multicast IP. |
| IP Address/Server Address | |
| Port Set the multicast port. | |
Step 6 Click Apply.
After configuring the multicast address and port, you can log in to the web interface or the PC client via multicast.
For example, on the login page of the PC client, select Multicast as the login type. The PC client will automatically obtain the multicast address and join the multicast group. After login, you can view live videos through multicast protocol.
Figure 6-23 Log in through multicast

6.2.2.8 DDNS
After setting DDNS parameters, when IP address of the Device changes frequently, the system dynamically updates the relation between domain name and IP address on the DNS server. You can use the domain name to remotely access the Device, without need to note down IP address.
Prerequisites
Check the type of DDNS that the Device supports and then log in to the website provided by the DDNS service provider to register domain and other information.

After registration, you can log in to the DDNS website to view the information of all the connected devices under the registered account.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Network.
You can also click Network from the configuration list on the home page.
Step 3 Select Network Application > DDNS.
Figure 6-24 DDNS

Step 4 Click to enable the DDNS function.

After you enable the DDNS function, the third-party server might collect your device information. Pay attention to privacy security.
Step 5 Set the parameters.
Table 6-14 DDNS parameters
| Parameters Description | |
| Type | Select the type of the DDNS service provider and then corresponding address displays.· Dyndns DDNS: members.dyndns.org· NO-IP DDNS: dynupdate.no-ip.com· CN99 DDNS: members.3322.org |
| Server Address | |
| Domain | Enter the domain name that you have registered on the DDNS website. |
| Username | Enter the username and password obtained from DDNS service provider. You need to register (including username and password) on the website of DDNS service provider in advance. |
| Password | |
| Interval | Enter the interval at which you want to update the DDNS. |
| WAN IP Displays the | WAN IP address of EVS. |
| Status | Displays DDNS registration result or update status. |
Step 6 Click Apply.
After successful configuration, enter domain name in address bar of the browser or PC client, and press Enter key to access the EVS.
6.2.2.9 Routing Table
Configure the route table so that the system can automatically calculate the best path for data transmission.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Network.
You can also click Network from the configuration list on the home page.
Step 3 Select Network Application > Routing Table.
Step 4 Click Add.
Figure 6-25 Add route table

Step 5 Configure the parameters.
Step 6 Click Apply.
6.3 Storage Management
Log in to the PC client. Click 📋 on the upper-right corner and then click Storage. You can manage storage resources (such as recorded videos) and space to improve the utilization ratio of storage space.

The system supports pre-check and routine inspection, and you can obtain real-time storage status of the Device and avoid data loss.
- Pre-check: During device operation, the system automatically detects disk status in case of change (restart, insert and pull the disk).
- Routine inspection: The system executes t routine inspection on the disks continuously. During
device operation, the disk might go wrong due to service life, environment and other factors. You can find out problems during routine inspections.
6.3.1 Storage Resource
6.3.1.1 Disks
Log in to the PC client. Click 📋 on the upper-right corner and then select Storage > Storage Resource > Disk to view the disk space (free space/total space), temperature (centigrade/Fahrenheit), disk information and more.
If no read or write task is performed, the disk will enter into 3 different mode and can be woke up when needed. Configure the 3 different modes to increase service life of the disk.
Procedure
Step 1 Log in to the PC client.
Step 2 Click ☐ on the upper-right corner and then select Storage > Storage Resource > Disk.
Step 3 Click Sleep Strategy, and then select a mode.
Step 4 Click OK.
S.M.A.R.T is Self-Monitoring Analysis and Reporting Technology. It is a technical standard to check disk status and report potential problems. The system monitors the disk running status and compares with the specified safety value. Once the status is higher than the specified value, the system displays alarm information to guarantee disk data security.
Log in to the PC client. Click 📋 on the upper-right corner and then select Storage > Storage
Resource > Disk. Select a disk, and then click S.M.A.R.T. You can check the disk status. If there is any problem, fix it in time.
Figure 6-26 S.M.A.R.T
| No. | Note | No. | Worst | Boundary | Original Data | Status |
| 1 | Read Error Rate | 83 | 64 | 44 | 197442692 | Excellent |
| 3 | Spin Up Time | 93 | 93 | 0 | 0 | Excellent |
| 4 | Start/Stop Count | 96 | 96 | 20 | 4231 | Excellent |
| 5 | Reallocated Sector Count | 100 | 100 | 10 | 0 | Excellent |
| 7 | Seek Error Rate | 93 | 60 | 45 | 2048650125 | Excellent |
| 9 | Power On Hours Count | 78 | 78 | 0 | 20055 | Excellent |
| 10 | Spin-up Retry Count | 100 | 100 | 97 | 0 | Excellent |
| 12 | Power On/Off Count | 100 | 100 | 20 | 562 | Excellent |
| 184 | End-to-End Error | 100 | 100 | 99 | 0 | Excellent |
| 187 | Reported Uncorrect | 100 | 100 | 0 | 0 | Excellent |
Log in to the PC client. Click 📋 on the upper-right corner and then select Storage > Storage Resource > Disk. Select, and then click Format.
6.3.1.1.4 Fixing the File System
When you cannot mount the disk or you cannot properly use the disk, you can try to fix the file system.
Log in to the PC client. Click 📋 on the upper-right corner and then select Storage > Storage Resource > Disk. Select, and then click Fix File System. You can repair the file system of the corresponding disk. The repaired disk can be mounted and work properly.
6.3.1.2 RAID
RAID (Redundant Array of Independent Disks) is a data storage virtualization technology that combines multiple physical disks into a single logical unit for the purposes of data redundancy, performance improvement, or both.

- The Device supports RAID0, RAID1, RAID5, RAID6, RAID10, RAID50 and RAID60. See "Appendix 3 RAID" for detailed information.
- We recommend you use enterprise HDD when you are creating RAID, and use surveillance HDD for single-HDD mode.
6.3.1.2.1 Creating RAID
RAID has different levels such as RAID5, RAID6 and more. Different RAID levels are different in data protection, data availability and performance. Create RAID according to your actual requirements.

Please be advised that creating RAID will clear all data on the member disks.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Storage.
You can also click Storage from the configuration list on the home page.
Step 3 Select Storage Resource > RAID > RAID.
Step 4 Click Add.
Step 5 Set RAID parameters.
Select a RAID level according to actual situation. You can select Manual Create and One-click Create.
- Manual Create: The system creates the specified level of RAID using the selected disks.
Figure 6-27 Manual create

Table 6-15 Manual creation parameters description
| Parameter Description | |
| Storage Device | Select the storage device where the disks are located and select the disks you want to add to the RAID. Different levels of RAID might need different number of disks. |
| RAID | Select the level of RAID that you want to create. |
| Working mode | Set RAID resources allocation mode. The default mode is self-adaptive.Self-adaptive: The system automatically adjusts RAID synchronization speed according to current business load. When there is no external business, the synchronization speed is high. When there is external business, the synchronization speed is low.Sync Priority: The system allocates resources to RAID synchronization first.Operation Priority: The system allocates resources to business first.Load Balance: The system allocates resources to business and RAID synchronization equally. |
| Name Set RAID name. |
• One-Click Create: The system creates RAID5 according to the current number of disks.
Figure 6-28 One-click create

Table 6-16 One-click creation parameters description
| Parameter Description | |
| Storage Device | Select the storage device where the disks are located. |
| Working mode | Set RAID resources allocation mode. The default mode is self-adaptive.Self-adaptive:The system automatically adjusts RAID synchronization speed according to current business load. When there is no external business, the synchronization speed is high. When there is external business, the synchronization speed is low.Sync Priority:The system allocates resources to RAID synchronization first.Operation Priority:The system allocates resources to business first.Load Balance:The system allocates resources to business and RAID synchronization equally. |
Step 6 Click Next.
Step 7 Confirm information, and then click Create

If the information is wrong, click Back to modify the RAID parameters.
Related Operations
After creating RAID, you can view RAID disk status and details, clear up RAID, and repair file system.
Table 6-17 RAID operations
| Name Operation | |
| View the status of RAID member disks | Click + next to the RAID name to open the RAID disk list. You can view the space and status of the member disks. |
| View RAID details Click the icon under Status to view details on the RAID. | |
| Fix file system | When you cannot mount the RAID or you cannot properly use the RAID, you can try to fix the file system.Select one or more RAID groups, and then click Fix File System . The repaired RAID can work properly or be mounted. |
| Modify working mode | Select one or more RAID groups, and then click Working Mode to modify the working mode. |
| Format RAID | Select one and more RAID groups, and then click Format. Please be advised that formatting will clear all data on the RAID. |
| Delete RAID | Select one and more RAID groups, and then click Delete Please be advised that deletion will clear all data on the RAID and destroy the RAID group. |
6.3.1.2.2 Creating a Hot Standby Disk
When a disk in the RAID group is malfunctioning or has a problem, the hot spare disk can replace the malfunctioning disk to avoid data loss and ensure reliability of the storage system.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Storage.
You can also click Storage from the configuration list on the home page.
Step 3 Select Storage Resource > RAID > Hot Standby.
Step 4 Click Add.
Step 5 Select hot standby creation type.
- Global Hot Standby: Create a hot standby disk for all RAID groups. Select the storage device and then select one or more disks that you want to add to the global hot standby.

The system only displays disks with a storage capacity of at least 3 TB.
- Private Hot Spare: Create a hot standby disk for a specified RAID group. Click the Add to box to select the RAID group that the private hot standby works for and then select one or more disks that you want to add to the private hot standby.
Figure 6-29 Global hot standby

Figure 6-30 Private hot standby

Step 6 Click Next.
Step 7 Confirm information, and then click Create.

If the information is wrong, click Back to modify the hot standby parameters.
Step 8 Click Create.
Figure 6-31 Hot standby

Network disk is a network-based online storage service that stores device information on the network hard disk through the iSCSI protocol.
Log in to the PC client. Click 📋 on the upper-right corner and then select Storage > Storage Resource > Network Disk > iSCSI Application. .ou can view usage of the network disk, including its remaining capacity and status.
- Select a network disk, and then click Format to format the disk.

Please be advised that formatting will erase all data on the disk.
- Click the box in the Disk Operation column, and then you can select an operation permission type.
Read/Write: One can read, edit, add, and delete data on this disk.
- Read Only: One can only read data on this disk.
Set up the network disk through iSCSI and map the network disk to the Device so that the Device can use the network disk for storage.

Make sure that service has been enabled on the iSCSI server and the server has provided the shared file directory.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Storage.
You can also click Storage from the configuration list on the home page.
Step 3 Select Storage Resource > Network Disk > iSCSI Management.
Step 4 Click Add.
Figure 6-32 Add iSCSI

Step 5 Set parameters.
Table 6-18 Network disk parameters
| Parameter Description | |
| IP Address | Enter the IP address of the iSCSI server. |
| Port | Enter the port number of the iSCSI server. It is 3260 by default. |
| Anonymous | Click to enable anonymous login. If iSCSI server has no permission limitation, you can log in to the server without entering the password and username. |
| Username | If permission is required to access the shared file directory on the iSCSI server, you need to enter username and password. |
| Password | |
| Storage Path | Click Search to select the storage directory.The storage directory is generated when the shared file directory is being created on the iSCSI server. Each directory represents an iSCSI disk. |
Step 6 Click OK.

- Click to delete a disk; click Refresh to refresh the disk list.
- On the Disk Group Settings page, you can configure network disk groups.
6.3.1.4 SFTP
Configure SFTP server for video and picture storage. This section uses configuring SFTP as an example.

- FTP is unencrypted transmission, while SFTP is encrypted transmission. You are recommended to use SFTP.
- When creating SFTP user, you need to configure write permission of SFTP folder. Otherwise, you cannot upload files.
- You need to purchase or download SFTP tool and install it on your PC.
Procedure
Step 1 Click, or select
Storage on the home page, and then select Storage Source > SFTP.
Figure 6-33 SFTP

Step 2 Click to enable SFTP.
Step 3 Set parameters.
Table 6-19 SFTP parameters
| Parameter Description | |
| Server Address | SFTP server IP address. |
| Port It is 22 by default. | |
| User Name | The username and password of the SFTP server. |
| Password | You can keep the username as anonymous, so as to log in in an anonymous way. |
| Directory | Enter the SFTP directory.The system automatically establishes folders according to the IP, time, and channel information if you leave the directory empty.Enter the directory name, and then the system creates a folder accordingly under the root directory of SFTP and generates different folders according to the IP, time, and channel information. |
| File Size | Set the size of the file to be uploaded.If the to-be-uploaded file is larger than the threshold, the system uploads only part of it (the same size with the threshold).If the to-be-uploaded file is smaller than the threshold, the system uploads the whole of it.If the threshold you have set is 0, the system uploads the whole of the file. |
| Picture Upload Interval | Set the upload interval of images. |
| Channel No. | Set the channel number of the video file. |
| Day | Select the day, the time period, and file type (event file or regular file). The system uploads files in the time periods as you have set. |
| Period | |
| Test | Click Test to test the SFTP connection. |
Step 4 Click Save.
6.3.2 Storage Settings
6.3.2.1 Configuring Disk Groups
The installed disks and created RAID groups are allocated to group 1 by default. You can create more disk groups and allocate disks and RAID groups to other groups. The videos and images of all channels are stored in disk group 1 by default. You can allocate the video and image storage of different channels to different disk groups.
Procedure
Step 1 Log in to the PC client.
Step 2 Click 📋 on the upper-right corner and then click Storage.
You can also click Storage from the configuration list on the home page.
Step 3 Select Storage > Disk Group Settings.

- The value (such as 5) next to the group name refers to the number of disks and RAID groups in the disk group. If 1 is displayed, it means there were videos or images stored in the disk group but now there is no available disk or RAID group in the disk
group.
• indicates picture storage. indicates video storage
Figure 6-34 Disk group

Step 4 Click Add, enter the group name, and then click OK.
A new disk group is created.
Step 5 Click a disk group and then under the Disk tab, you can allocate the disks or RAID groups for the disk group.
- Add disks or RAID groups to the current disk group: Click Add, select one or more disks or RAID groups, and then clickOK.
- Move disks or RAID groups to another disk group.
One by one: Click Move to under Operation, select a disk group, and then click OK.
In bathes: Select one or more disks or RAID groups and then clickMove to next to Add, select a disk group, and then click OK.
Step 6 Click a disk group and then under the Video or Picture tab, you can allocate the video or image storage of different channels to disk groups.
- Add channels to the current disk group for video or image storage: Click Add, click Channel Name or Channel No. to search for channels, select one or more channels, and then click OK.
Figure 6-35 Add channels

- Move channels to another disk group for video or image storage.
One by one: Click Move to under Operation, select a disk group, and then click OK. In bathes: Select one or more channels and then click Move to next to Add, select a disk group, and then click OK.
Step 7 (Optional) Click Advanced and then select the checkbox to enable load balance.
After you enable load balance, the system automatically moves videos from ineffective disk groups and evenly allocates them to functional groups.
6.3.2.2 Recording Control
Configure recording modes and schedules for channels.
6.3.2.2.1 Configuring Recording Mode
Configure recording modes for channels.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Storage.
You can also click Storage from the configuration list on the home page.
Step 3 Select Storage > Record Control.
Step 4 Configure the recording mode for each channel.
- Scheduled: The Device records automatically according to the schedule.
- Manual: The Device records around the clock and does not respond to the recording schedule.
- Close: The Device does not record for the channel.

• means that the type is selected.
- Sub Stream 1 and Sub Stream 2 cannot be enabled at the same time.
Figure 6-36 Recording Mode

Step 5 Click Apply.
6.3.2.2.2 Configuring Recording Schedule
Configure video and picture recording schedules so the Device records videos and captures pictures as configured in the specified period.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Storage.
You can also click Storage from the configuration list on the home page.
Step 3 Select Storage > Record Control.
Step 4 Click ⚙, and then set a recording schedule.
Figure 6-37 Set a recording schedule

Step 5 Select General, Record Events, or both as the recording type.
- General: Click the box next to General to select a schedule or click Add Schedule to add a new schedule. The Device records in the configured schedule.
- Record Events: Set the pre-record time. The Device records before an event occurs.
Step 6 Configure other parameters.
Table 6-20 Time plan parameters
| Parameter Description | |
| ANR | Click to enable ANR (Automatic Network Replenishment).When the network connection between the Device and IPC fails, the IPC continues to record videos and store videos on the SD card on the camera. When network recovers, the Device downloads those videos from IPC.Set the maximum recording upload period. If the offline period is longer than the defined period, IPC will only upload the recording file during the specified period.Make sure that the IPC has an SD card and is recording. |
| Record Stream | Select stream types and recording modes. |
| Instant Record Duration | The duration of instant recording. After starting instant recording under theLivetab, if you do not stop recording, the system will automatically stops after the defined duration. |
| Manual Snapshot | The number of images for each manual capture action. You can also configure the interval between manual snapshots. |
| Event Snap | Configure the interval between event snapshots. |
| Copy to Copy the current settings to other channels. | |
Step 7 Click Apply.
6.3.2.3 Basic Storage Settings
Configure the storage mode when the disk space is used up, automatic deletion of expired files, and image storage strategy.
6.3.2.3.1 Setting Storage Mode
Configure the storage mode when there is no more disk space available.
Procedure
Step 1 Log in to the PC client.
Step 2 Click 📋 on the upper-right corner and then click Storage.
You can also click Storage from the configuration list on the home page.
Step 3 Select Storage > Basic.
Step 4 Set storage mode.
- Overwrite: When free disk space is less than 100 GB or 2% of the total space (the larger of the two values prevails), the Device deletes 100 GB of the earliest record files and continues to record.

Data will be overwritten in the Overwrite mode. Back up in time.
- Stop: When free disk space is less than the defined free space alarm rate of the total space, an alarm is triggered and the Device continues recording until free disk space is used up.
Figure 6-38 Storage mode

Step 5 Click Apply.
6.3.2.3.2 Setting Automatic File Deletion
You can enable the Device to automatically delete files older than a certain number of days.
Procedure
Step 1 Log in to the PC client.
Step 2 Click 📋 on the upper-right corner and then click Storage.
You can also click Storage from the configuration list on the home page.
Step 3 Select Storage > Basic.
Step 4 Set automatic file deletion.
- Never: The Device does not delete files automatically.
- Custom: The Device automatically deletes files older than the configured number of days.

The deleted files cannot be recovered.
Figure 6-39 Delete expired files

Step 5 Click Apply.
6.3.2.3.3 Setting Image Storage Strategy
Procedure
Step 1 Log in to the PC client.
Step 2 Click 📋 on the upper-right corner and then click Storage.
You can also click Storage from the configuration list on the home page.
Step 3 Select Storage > Basic.
Step 4 Select an image storage strategy from Linkage Configuration and Always Use.
Figure 6-40 Image storage strategy

Step 5 Click Apply.
6.3.2.4 Record Transfer
When the Device and an IPC are disconnected, the IPC continues to record and stores the recording in the SD card. After the network recovers, the Device will download the recording during the disconnection from the IPC.
There are 2 ways for record transfer after the network recovers.
- Automatic download: After the network recovers, the Device automatically downloads the recording in the defined time period.
- Manual download: If ANR is not enabled when you set the recording schedule, after the network
recovers, the Device can not automatically download the recording during the disconnection, but you can manually create a download task.
Procedure
Step 1 Log in to the PC client.
Step 2 Click ☐ on the upper-right corner and then click Storage.
You can also click Storage from the configuration list on the home page.
Step 3 Select Storage > Transfer Record.
Step 4 Click Add.
Figure 6-41 Add a task

Step 5 Select Channel Name or Channel No. to search for channels.
Step 6 Select channels and then set the time period.
Step 7 Click Add.
The system downloads files recorded on the selected channels during the defined period.

Select a transfer task, click Delete to delete it. A task in progress cannot be deleted.
6.3.2.5 Video Retrieval
During the idle period of the device, supports recording the video files of other devices in the EVS.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Storage.
You can also click Storage from the configuration list on the home page.
Step 3 Select Storage > Video Retrieval.
Step 4 Click Add, to add video retrieval task.
Figure 6-42 Add task

Table 6-21 Parameter description
| Parameter Description | |
| Task Type | SupportsScheduled TaskandSingle Task. |
| Channel No. | Enter the channel No. of the device. |
| Start Time | Set the time period. |
| End Time | |
| IP Address | IP address of remote device. |
| Port Port of remote device, 37777 by default. | |
| Username | Username and password of remote device. |
| Password | |
| Stream Type Select the stream type. | |
| Remote CH No. | Enter the channel No. of remote device. |
Step 5 Click OK.
6.4 Event Management
Log in to the PC client. Click 📷 on the upper-right corner and then click Event.
On the page, configure alarm events for the Device and remote devices.
- Select the root node on the device tree to set alarm events for the Device.
- Select a remote device on the device tree to set alarm events for the remote device.

- The alarm event might be different depending on the model you purchased.
- means that the corresponding alarm event has been enabled.
• means that AI by Camera has been enabled.
Figure 6-43 Event management

6.4.1 Alarm Actions
The system triggers the corresponding actions when an alarm occurs.

The supported actions might be different depending on the AI function.
On the alarm configuration page, click Select next to Event Linkage to select linkage actions.
Configure actions according to your actual need.
Figure 6-44 Event linkage

Table 6-22 Actions description
| Action Description Preparation | ||
| Record | The system links the selected remote device to record videos when a linkage event occurs. | A remote device, such as IPC, has been added. |
| Buzzer | The system activates a buzzer alarm when a linkage event occurs. | — |
| Log | The system notes down the alarm information in the log when a linkage event occurs. | |
| Send Email | The system sends alarm email to all added receivers when a linkage event occurs. | Email configuration has been completed. See "6.2.2.3 Email" for detailed information. |
| Picture Storage | The system takes snapshots of the linked channel and save them on the Device when there is a corresponding event. | — |
| Preset | The system links the selected remote device to rotate to the designated preset point when a linkage event occurs. | The PTZ device has been added, and preset point has been added. See "3.5.2 Adding Remote Devices" for detailed information. |
| Alarm-out Port | When a linkage event occurs, the system triggers the | The Device is connected with alarm output device. |
| Remote Device Alarm Output | corresponding device to generate alarms. | The remote device has been added, and the remote device is connected with an alarm output device. See "3.5.2 Adding Remote Devices" for detailed information. |
| Access Control | When a linkage event occurs, the system triggers the corresponding access control device to open door and close door. | See "3.5.2 Adding Remote Devices" for detailed information. |
| Audio Linkage | When a linkage event occurs, the system plays the selected audio file. | Audio function has been configured. See "5.8 Audio Management" for detailed information. |
| Smart Tracking | When a tripwire or intrusion event occurs, the linked PTZ camera automatically rotates to the target to track it. | See "5.1.1.3.5 Smart Tracking". |
| Upload Alarms | When a linkage event occurs, the system reports the alarm to alarm center. | The alarm center has been enabled. For details, see "6.2.2.4 Alarm Center". |
| Remote Warning Light | When a linkage event occurs, the system associates with the remote device to turn on the warning light. | The remote device that supports this function has been connected. |
6.4.1.1 Record
Enable record control function. The system links the selected remote device to record when a linkage event occurs.

Make sure that a remote device, such as IPC, has been added.
Procedure
Step 1 On the alarm configuration page, click Record. Select next to Event Linkage, and then select Record.
Figure 6-45 Record

Step 2 Set the time length of recording after the event moment.
Step 3 In the Device box, select one or more remote devices for linkage recording.
Step 4 Click Apply.
6.4.1.2 Buzzer
The system activates a buzzer alarm when a linkage event occurs.
On the alarm configuration page, click Select next to Event Linkage, select Buzzer, and then click Apply.
Figure 6-46 Buzzer

6.4.1.3 Log
Enable the log function. The system notes down the alarm information in the log when a linkage event occurs.
On the alarm configuration page, click Select next to Event Linkage, select Log, and then click
Apply.

After the log function is enabled, you can select Maintain > Log > Event Logs on the home page to search for logs.
6.4.1.4 Email
After you enable the email function, the system sends alarm emails to all added receivers when a linkage event occurs.

Make sure that the email configuration has been completed. See "6.2.2.3 Email" for detailed information.
On the alarm configuration page, click Select next to Event Linkage, select Send Email, and then click Apply.
6.4.1.5 Preset
Set preset function. The system links the selected remote device to rotate to the designated preset point when a linkage event occurs.

Make sure that the PTZ device has been added, and preset has been added.
Procedure
Step 1 On the alarm configuration page, click Select next to Event Linkage, and then select Preset.
Figure 6-47 Preset

Step 2 Select a PTZ device, and then enter the preset number.
Step 3 (Optional) Click ✅ to link multiple PTZ devices to turn to designated presets.
Step 4 Click Apply.
6.4.1.6 Picture Storage
Set the picture storage linkage. When a linkage event occurs, a snapshot is taken and saved on the Device.

When AI by Camera is used, make sure that the remote device has been configured with snapshot linkage.
On the alarm configuration page, click Select next to Event Linkage, select Picture Storage, and then click Apply.
6.4.1.7 Local Alarm Output
Set local alarm output. The alarm output device connected with the Device generates an alarm the corresponding alarm when a linkage event occurs.

Make sure that the Device is connected with an alarm output device.
Procedure
Step 1 On the alarm configuration page, click Select next to Event Linkage, and then select Alarm-out Port.
Figure 6-48 Local alarm output

Step 2 Select one or more alarm output ports.
Step 3 In the Post-alarm box, configure the length of time for the alarm to continue after the event ends.
Step 4 Click Apply.
6.4.1.8 Remote Device Alarm Output
Set remote device alarm output. The system links the corresponding remote alarm output device to generate an alarm when a linkage event occurs.

Make sure that the remote device has been added, and the remote device is connected with alarm output device. See "3.5.2 Adding Remote Devices" for detailed information.
Procedure
Step 1 On the alarm configuration page, click Select next to Event Linkage, and then select Remote Device Alarm Output.
Figure 6-49 Remote device alarm output

Step 2 Select a remote device and then select one or more alarm output ports.
Step 3 Click ✅ to link multiple remote alarm output devices.
6.4.1.9 Access Control
Set access control function. When a linkage event occurs, the system links the corresponding access control device to open door and close door.

Make sure that access control device has been added.
Procedure
Step 1 On the alarm configuration page, click Select next to Event Linkage, and then select Access Control.
Step 2 Select an access control device.

For some access controls devices, you can select channels.
Step 3 (Optional) Click 🔒 to link multiple access control devices.
Step 4 Click Apply.
6.4.1.10 Audio Linkage
Set audio linkage function. When a linkage event occurs, the system plays the selected audio file.

Make sure that the voice function has been configured.
Procedure
Step 1 On the alarm configuration page, click Select next to Event Linkage, and then select Audio Linkage.
Figure 6-50 Audio linkage

Step 2 Select the audio file and then set the play mode.
- Play Times: After the event ends, the system continues to play the audio file according to the play times.
- Duration: After the event ends, the system continues to play the audio file according to the duration.

You can click to go to the Audio page where you can configure the audio files.
Step 3 Click Apply.
6.4.1.11 Smart Tracking
After you enable smart tracking, when a tripwire or intrusion event occurs, the linked PTZ camera automatically rotates to the target to track it.

- Smart tracking is only available for AI by Camera.
- Smart tracking is only available on the multi-sensor panoramic camera + PTZ camera.
On the alarm configuration page, click Select next to Event Linkage, select Smart Tracking, and then click Apply.
6.4.1.12 Uploading Alarms
After you enable alarm upload, when a linkage event occurs, the system reports the alarm to alarm center.
On the alarm configuration page, click Select next to Event Linkage, and then select Upload Alarms.

Make sure that alarm center has been enabled.
6.4.1.13 Remote Warning Light
After you enable the linkage remote warning light, when a linkage event occurs, the system associates with the remote device to turn on the warning light.

Remote warning light is available when AI by camera is used for IVS detection and the camera supports this function.
Procedure
Step 1 On the alarm configuration page, click Select next to Event Linkage, and then select Remote Warning Light.
Step 2 Select the remote device and then set the duration.
Step 3 Click Apply.
6.4.2 Local Device
You can set alarms for system errors, system offline, configure smart plans, and more.
6.4.2.1 One-click Disarming
Disarm alarm linkage actions as needed to avoid interference caused by alarms.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Event.
You can also click Event from the configuration list on the home page.
Step 3 Select the root node on the device tree.
Step 4 Select Overview > Disarming.
Figure 6-51 Disarming

Step 5 Click to enable disarming.
Step 6 Cancel the selection of alarm linkage actions as needed.
Step 7 (Optional) Configure disarming by period.
1) Click ○ to enable disarming by period.
2) Click Add Schedule to add a disarming schedule. The alarm linkage actions remain armed during periods beyond the disarming schedule.
3) ClickApply.

After disarming by period is enabled, one-click disarming is disabled automatically.
Step 8 Configure remote channel disarming.
1) Click the Device Name list in the Remote Channel Disarming section. The remote devices that support one-click disarming are displayed.
2) Select the device that you want to synchronize the disarming configuration with.
Step 9 Click Apply.
6.4.2.2 Abnormal Events
Set the alarms for abnormal events such as no disk, storage errors, and IP conflict.
Table 6-23 Abnormal events
| Name Description | |
| No Disk | The system triggers an alarm when there is no disk. It is enabled by default. |
| Disk health exception | The system triggers an alarm when SSD health exception occurs. |
| Storage error | The system triggers an alarm when disk error occurs. It is enabled by default. |
| Low disk space warning | The system triggers an alarm when the used storage space reaches the predefined threshold. It is disabled by default. |
| Abnormal storage pool | The system triggers an alarm when the storage pool is abnormal. |
| Low quota space | The system triggers an alarm when quota space is low. It is enabled by default. |
| Video frame loss | The recording video of device has dropped frames, triggering an alarm and it is enabled by default. |
| IP conflict | The system triggers an alarm when its IP address conflicts with IP addresses of other devices on the same LAN. It is enabled by default. |
| MAC conflict | The system triggers an alarm when its MAC address conflicts with MAC addresses of other devices on the same LAN. It is enabled by default. |
| Abnormal system disk | The system triggers an alarm when system disk is abnormal. |
| Account lockout | The system triggers an alarm when the number of failed login attempts has reached the threshold. At the same time, the system locks current account. It is disabled by default.Go to Security >Attack Defense >Account Lockout to set the allowed number of failed login attempts. |
| Security exception | The system triggers an alarm when a security issue occurs. It is enabled by default. |
| Fan speed exception | When the fan speed is abnormal, the system triggers an alarm. It is enabled by default. |
| Power alarm | When the power supply is abnormal, the system triggers an alarm. It is disabled by default. |
| Abnormal shared service | The system triggers an alarm when the network storage is abnormal. It is disabled by default. |
| Device temperature alarm | The system triggers an alarm when the temperature of the device is higher than 95°C or lower than 0°C. It is disabled by default. |
This section uses no disk as an example. For other events, the setting steps are similar.
Procedure
Step 1 Log in to the PC client.
Step 2 Click 📋 on the upper-right corner and then click Event.
You can also click Event from the configuration list on the home page.
Step 3 Select the root node on the device tree.
Step 4 Select Exception > No Disk.
Figure 6-52 No disk

Step 5 Click to enable the alarm against no disk.
Step 6 Click Select next to Event Linkage to set alarm actions. See "6.4.1 Alarm Actions" for detailed information.
Step 7 Click Save.
6.4.2.3 Offline Alarm
Set the offline alarm for EVS. If you have not set offline alarm for a remote device, once the remote device is disconnected from the system, the system adopts the alarm strategy for EVS to trigger an alarm.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Event.
You can also click Event from the configuration list on the home page.
Step 3 Select the root node on the device tree.
Step 4 Select Offline > Offline.
Figure 6-53 Offline alarm

Step 5 Click to enable the offline alarm.
Step 6 Click Schedule to select a schedule from the drop-down list.
The system triggers corresponding alarm actions only during the alarm deployment period.

You can select an existing schedule from the Schedule drop-down list. You can also add a new schedule. For details, see "6.7.3 Schedule".
Step 7 Click Select next to Event Linkage to set alarm actions. For details, see "6.4.1 Alarm Actions".
Step 8 Click Save.
6.4.2.4 Viewing Smart Plans
After you add the remote devices to the EVS, the system obtains the smart detection functions of the remote devices.
Log in to the PC client. Click 📋 on the upper-right corner of the page and then click Event. Select the root node on the device tree on the left, and then select Smart Plan > Smart Plan. You can view the smart detection functions that EVS supports and the channels on which each smart function is enabled.

indicates that AI by Camera is enabled.
Figure 6-54 Smart plan

6.4.3 Remote Device
Set alarm actions for remote devices, including video detection alarm, offline alarm and smart detection alarm.

The parameters might be different depending on the model you purchased.
6.4.3.1 Video Detection
The system monitors and analyzes the video image. When there are considerable changes on the video, for example, the image becomes blurry, the system triggers an alarm.

Click after Video Detection to go to the configuration page of the corresponding device quickly.
6.4.3.1.1 Configuring Video Motion Detection
The system generates a video motion alarm when the detected moving target reaches the configured sensitivity.
Procedure
Step 1 Log in to the PC client.
Step 2


on the upper-right corner and then click Event.
You can also click Event from the configuration list on the home page.
Step 3
Select a remote device from the device tree.
Step 4 Select
Video Detection > Motion Detection.
Figure 6-55 Motion detection

Step 5 Click to enable video motion detection.
Step 6 Configure the anti-dither period. The system only records one alarm event during the anti-dither period.
Step 7 Configure motion detection regions.
You can draw up to 4 detection zones. When motion is detected in any of the 4 regions, an alarm is triggered.
1) Click the motion detection zone icon
2) On the video image, drag the mouse to draw a detection zone.
- Click an icon in 🔒 and then click 🔒 to delete the corresponding detection zone.
- Click 📁 to clear all the detection zones.
3) Set parameters.
Table 6-24 Motion detection zone parameters
| Parameter Description | |
| Name | Set detection zone name to distinguish different zones. |
| Sensitivity | Drag to set sensitivity.The higher the sensitivity, the easier it is to trigger an alarm. At the same time, the false alarm rate increases as well. We recommend the default value. |
| Threshold | Drag to adjust the threshold.Once the detected percentage (the percentage of the moving target to the detection zone) is equal to or larger than the specified threshold, the system triggers an alarm. For example, the threshold is 10. Once the detected target occupies 10% or more of the detection zone, the system triggers an alarm. |
Step 8 Click Schedule to select a schedule from the drop-down list.
The system triggers corresponding alarm actions only during the alarm deployment
period.

You can select an existing schedule from the Schedule drop-down list. You can also add a new schedule. For details, see "6.7.3 Schedule".
Step 9 Click Select next to Event Linkage to set alarm actions. For details, see "6.4.1 Alarm Actions".
Step 10 Click Save.
6.4.3.1.2 Tampering
When something tampers the surveillance video, and the output video is in one color, the system triggers an alarm.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Event.
You can also click Event from the configuration list on the home page.
Step 3 Select a remote device from the device tree.
Step 4 Select Video Detection >Video Tampering.
Figure 6-56 Tampering

Step 5 Click to enable tampering alarm.
Step 6 Click Schedule to select a schedule from the drop-down list.
The system triggers corresponding alarm actions only during the alarm deployment period.

You can select an existing schedule from the Schedule drop-down list. You can also add a new schedule. For details, see "6.7.3 Schedule".
Step 7 Click Select next to Event Linkage to set alarm actions. For details, see "6.4.1 Alarm Actions".
Step 8 Click Save.
6.4.3.2 Offline Alarm
When the remote device is disconnected from the EVS, the system triggers an alarm.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Event.
You can also click Event from the configuration list on the home page.
Step 3 Select a remote device from the device tree.
Step 4 Select Offline > Offline.
Figure 6-57 Offline alarm

Step 5 Click to enable offline alarm.

The offline alarm is enabled by default. You can skip this step.
Step 6 Click Schedule to select a schedule from the drop-down list.
The system triggers corresponding alarm actions only during the alarm deployment period.

You can select an existing schedule from the Schedule drop-down list. You can also add a new schedule. For details, see "6.7.3 Schedule".
Step 7 Click Select next to Event Linkage to set alarm actions. For details, see "6.4.1 Alarm Actions".
Step 8 Click Save.
6.4.3.3 IPC External Alarm
Set the external alarm input event, so that when there is an alarm input to the remote device, the remote device uploads the alarm to the Device. If the remote device has multiple IO ports, you can set the alarm input event for each port.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Event.
You can also click Event from the configuration list on the home page.
Step 3 Select a remote device from the device tree.
Step 4 Select External Alarm >Alarm-in Port1.
Figure 6-58 Alarm-in port 1

Step 5 Click to enable the alarm.
Step 6 Set parameters.
Table 6-25 External alarm parameters description
| Parameter Description | |
| Name Enter a name for the alarm. | |
| Type | Select the type of the alarm input device. Both NO and NC are supported. |
| Anti-dither | The system records only one event during this period. |
Step 7 Click Schedule to select a schedule from the drop-down list.
The system triggers corresponding alarm actions only during the alarm deployment period.

You can select an existing schedule from the Schedule drop-down list. You can also add a new schedule. For details, see "6.7.3 Schedule".
Step 8 Click Select next to Event Linkage to set alarm actions. For details, see "6.4.1 Alarm Actions".
Step 9 Click Save.
6.4.3.4 Thermal Alarm

- Alarm types might vary depending on the models of thermal cameras.
- Make sure that thermal detections such as heat detection and temperature detection have been
configured on the thermal camera.
Support the following thermal camera alarms.
Table 6-26 Thermal alarms
| Function Description | |
| Heat alarm | When the thermal camera detects a heat source, the alarm signal is transmitted to the Device, and the Device will perform an alarm linkage action. |
| Temperature alarm | When the thermal camera detects that the temperature is above or below the threshold value, the alarm signal is transmitted to the Device, and the Device will perform an alarm linkage action. |
| Temperature difference alarm | When the thermal camera detects a temperature difference greater than the set value, the alarm signal is transmitted to the Device, and the Device will perform an alarm linkage action. |
| Hot spot alarm | When the maximum temperature detected by the thermal camera is higher than the set value, the alarm signal is transmitted to the Device, and the Device will perform an alarm linkage action. |
| Cold spot alarm | When the lowest temperature detected by the thermal camera is below the set value, the alarm signal is transmitted to the Device, and the Device will perform an alarm linkage action. |
This section uses the configuration of temperature alarm as an example.
Procedure
Step 1 Log in to the PC client
Step 2 Click 📋 on the upper-right corner and then click Event.
You can also click Event from the configuration list on the home page.
Step 3 Select a thermal channel from the device tree.
Step 4 Select Thermal Alarm > Temperature Alarm.
Step 5 Click to enable the alarm.
Step 6 Click Schedule to select a schedule from the drop-down list.
The system triggers corresponding alarm actions only during the alarm deployment period.

You can select an existing schedule from the Schedule drop-down list. You can also add a new schedule. For details, see "6.7.3 Schedule".
Step 7 Click Select next to Event Linkage to set alarm actions. For details, see "6.4.1 Alarm Actions".
Step 8 Click Save.
6.5 Security Strategy
6.5.1 Security Status
Security scanning helps get a whole picture of the device security status.
- User and service detection: Detects whether the current login authentication, user status, and configuration security conform to recommended settings.
- Security modules scanning: Scans the running status of the security modules such as attach defense, log security and session security.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Security > Security Status.
Step 3 Click Rescan.
Figure 6-59 Security status

Related Operations
Different colors indicate different security statuses (green: normal; yellow: abnormal). For abnormal items, you can click Details to view details.
- Click Ignore to ignore the abnormal item. The item will not be checked in subsequent scans.

Click Rejoin Detection to include the ignored item into the security scan.
- Click Optimize to go to the corresponding configuration page where you can optimize the security settings.
Figure 6-60 Details

6.5.2 System Service
6.5.2.1 Basic Services
Enable basic system services for third-party access.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Security > System Service > Basic Services.
Figure 6-61 Basic services

Step 3 Enable or disable system services.
Table 6-27 System services
| Name Description | |
| SSH | After enabling this function, you can access the Device through SSH protocol to carry out system debugging and IP configuration. This function is disabled by default.For data security, we recommend you disable this function when it is not needed. |
| Multicast/Broadcast Search | After enabled, you can multicast or search for broadcast devices. |
| CGI | After this function is enabled, a third-party platform can connect the Device through CGI protocol.For data security, we recommend you disable this function when it is not needed. |
| ONVIF | After this function is enabled, other devices can connect the Device through ONVIF protocol.For data security, we recommend you disable this function when it is not needed. |
| Mobile Push Notifications | After enabling this function, you can use your mobile phone to receive notifications from the Device.For data security, we recommend you disable this function when it is not needed. |
| Run Log | After enabling it, you can view system running logs inMaintain > Intelligent Diagnosis > Run Log. |
| Login Mode | Select an authentication mode between security mode and compatibility mode. Security mode is recommended. |
| Password Expires in | Configure the password expiration interval. The Device prompts you to change the password when the password expires. |
Step 4 Click Apply.
6.5.2.2 Enabling HTTPS
HTTPS can use the reliable and stable technological means to guarantee user information and device security and communication data security. After you install the certificate and enable HTTPS function, you can use your computer to access the Device through HTTPS. To reduce the risk of data leakage, we recommend you enable the HTTPS service.
Prerequisites
Install the certificate. For details, see "6.5.4 CA Certificate".
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Security > System Service > HTTPS.
Step 3 Click to enable HTTPS function.
Figure 6-62 HTTPS

Step 4 (Optional) Click to enable
Compatible with TLSv1.1 and earlier versions.

TLS (Transport Layer Security) provides privacy and data integrity between two communications application programs.
Step 5 Click Apply.
You can use HTTPS to access the web interface.
Open the browser, enter https://IP address:port in the address bar, and then press Enter, and then you can log in to the web interface.

- IP address is IP address or the domain name of the Device.
- Port refers to HTTPS port number of the Device. If the HTTPS port is the default value 443, just use https://IP address to access the web interface.
6.5.3 Attack Defense
6.5.3.1 Firewall
You can configure the hosts that are allowed or prohibited to access the Device.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Security >Attack Defense >Firewall.
Figure 6-63 Firewall

Step 3 Select a firewall mode.
• All: All hosts can access the Device.
- Allowlist: The hosts on the allowlist can access the Device.
- Blocklist: The hosts on the blocklist are prohibited to access the Device.

Allowlist and blocklist cannot be used at the same time.
Step 4 If you select Allowlist or Blocklist, click Add to add an allowlist or blocklist.
You can allow or prohibit a specific IP address, IP addresses on a specific network segment, or a specific MAC address to access the Device.
Step 5 Click Apply.
6.5.3.2 Account Lockout
You can configure the number of allowed failed login attempts. When the number of failed login attempts reaches the defined threshold, the account will be locked for the defined duration.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Security >Attack Defense >Account Lockout.
Figure 6-64 Account lockout

Step 3 Click to enable the lockout limitation for different types of login accounts, and then configure the number of allowed login attempts and lock duration.

The lockout limitation for network login of the device account and login of the ONVIF account is enabled by default and cannot be disabled.
Step 4 Click Apply.
Step 5 (Optional) Click to go to the Lockout lockout alarm event.
Event page where you can configure the
6.5.3.3 Anti-Dos Attack
You can enable SYN Flood Attack Defense and ICMP Flood Attack Defense to defend the Device
against Dos attacks.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Security >Attack Defense >Anti-Dos Attack.
Figure 6-65 Account lockout

Step 3 Click to enable
SYN Flood Attack Defense or ICMP Flood Attack Defense.
Step 4 Click Apply.
6.5.3.4 Time Synchronization Permission
Configure permissions of time synchronization actions from other devices or servers.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Security >Attack Defense >Sync Time.
Figure 6-66 Sync time

Step 3 Click to enable time synchronization restriction.
Step 4 Select Allowlist or Blocklist.
- Allowlist: Hosts on the allowlist have the permission to synchronize time of the Device.
- Blocklist: Hosts on the blocklist cannot synchronize time of the Device.
Step 5 Click Add to add an allowlist or blocklist.
You can allow or prohibit a specific IP address, IP addresses on a specific network segment, or a specific MAC address to synchronize time with the Device.
Step 6 Add IP addresses to the allowlist or blocklist.
1) Click Add.
2) Select an IP version, and then enter an IP address.
3) Click OK.
Step 7 Click Apply.
6.5.4 CA Certificate
A CA certificate is a digital certificate issued by a certificate authority (CA). The CA verifies trusted certificates for trusted roots. Trusted roots are the foundation upon which chains of trust are built in certificates.
6.5.4.1 Installing the Device Certificate
A device certificate is a proof of device legal status. For example, if you want to access EVS through a browser, you need to install the root certificate on your computer in advance.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Security > CA Certificate > Device Certificate.
Figure 6-67 Device certificate

Step 3 Click Install Device Certificate to install a certificate in any of the following ways.
- Create a certificate.
- Select Create Certificate and then click Next.
Figure 6-68 Create certificate

- Enter the information.
Figure 6-69 Certificate information

- Click Create and install certificate.
- Apply for and import a certificate.
- Select Apply for CA Certificate and Import (Recommended) and then click Next.
- Enter the information.
- Click Create and Download. The Device creates and downloads a certificate
request file. Submit the file to a CA institute to apply for a signed certificate.
- Click Browse to select the certificate.
Figure 6-70 Import the certificate

- Click Import and Install.
- Import an existing certificate.
- Select Install Existing Certificate and then click Next.
- Enter the information.
- Click Browse to select the certificate and private key.
- Enter the password for the private key.
- Click Import and Install.
Related Operations
You can edit and download the installed certificate.
- Edit
Click Enter Edit Mode, enter a custom name for the certificate, and then click Save Config.
- Download
Click ↓ to download the certificate.
6.5.4.2 Installing the Trusted Certificate
A trusted CA certificate is used to verify the legal status of a host. For example, a switch CA certificate must be installed for 802.1x authentication.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Security > CA Certificate > Trusted Certificate.
Figure 6-71 Trusted certificate

Step 3 Click Install Trusted Certificate.
Step 4 Click Browse to select a trusted certificate.
Step 5 Click OK.
Related Operations
You can edit and download the installed certificate.
- Edit
Click Enter Edit Mode, enter a custom name for the certificate, and then click Save Config.
- Download
Click ↓ to download the certificate.
6.5.5 Video Encryption
The Device supports audio and video encryption during data transmission.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Security > Video Encryption > Encrypted Transmission.
Figure 6-72 Video encryption

Step 3 Configure the parameters.
Table 6-28 Encryption parameters
| Encryption Method Description | |
| Private Protocol | Click to enable encryption using the private protocol.Encryption Type: Leave it as default.Update Period of Secret Key: The value range from 0 hours through 720 hours. 0 means never update the secret key. |
| RTSP over TLS | Click to enable RTSP encryption using the TLS tunnel, and then select a device certificate. We recommend you enable this function to ensure data security.You can click Certificate Management to install a device certificate. |
Step 4 Click Apply.
6.5.6 Security Warning
The Device gives warnings to the user when a security error occurs.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Security > Security Warning.
Figure 6-73 Security warning

Step 3 Click to enable the function.
Step 4 Select the events to be monitored.
Step 5 Click Apply.
6.6 Account Management
The Device adopts two-level account management mode: user and user group. Every user must belong to a group, and one user only belongs to one group. To conveniently manage the users, we recommend the permissions of general users should be lower than those of high-level users.

To ensure device security, you need to enter the correct login password to operate on the ACCOUNT page (for example, add or delete a user).
6.6.1 Adding User Groups
The admin and Onvif groups are 2 default user groups. You can create more user groups to manage users with different levels of permissions.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Account.
You can also click Account from the configuration list on the home page.
Step 3 Select the root node at the upper-left corner and then click 🔍 at the lower-left corner.
Step 4 Enter the login password of the current account, and then click OK.
Figure 6-74 User group property

Step 5 Configure the parameters.
Table 6-29 User group attribute parameters
| Parameter Description | |
| Name | Customize a user group name.The name ranges from 1 to 64 characters. It can contain English letters, numbers and special characters ("_", "@", "."). |
| Parent Node | Displays the organization node that the user group belongs to. The system automatically recognizes the parent node. |
| Description Enter descriptions for the user group. | |
| User List | Displays users in the group. |
Step 6 Select user permissions.
1) Click the Permission tab.
Figure 6-75 Permission

2) Select the permissions for the user group.
Step 7 Click Apply.
Related Operations
Select a user group, click , enter the login password, and then click OK to delete the user group.

- Before you delete a user group, you need to delete all users in the current group first.
- The deleted user group cannot be restored.
- The admin and Onvif user groups cannot be deleted.
6.6.2 Adding Device Users
A device user can access and manage the Device. The default administrator is admin. You can add more users with different permissions depending on the user groups that the user belongs to.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Account.
You can also click Account from the configuration list on the home page.
Step 3 Select a user group, and then click.

Step 4 Enter the login password of the current account, and then click OK.
Figure 6-76 User attributes

Step 5 Configure the parameters.
Table 6-30 User attributes parameters
| Parameter Description | |
| Name | Set the username.The name ranges from 1 to 31 characters. It can contain English letters, number and special character ("_ ", "@", "."). |
| Parent Node | Displays the user group that the user belongs to. |
| Password | Enter the password and then confirm it.[IMAGE]Set a strong password according to the on-screen prompt. |
| Confirm Password | |
| Description Enter descriptions for the user. | |
Step 6 Click the Permission to view the permissions of the user.
Step 7 Click Apply.
Related Operations
After adding a user, you can modify user information or delete the user.

Only users in the admin group have the permission to manage accounts.
- Edit user information.
Select a user, and then under the Attribute tab, you can change the password and description of the user.
- Delete a user.
Select a user, and then click.

Before deleting an online user, you need to block the user first. For details, see "7.4.1 Online User".
◇ The deleted user cannot be restored.
6.6.3 Password Maintenance
Maintain and manage the login passwords of users.
6.6.3.1 Changing Password
Change the login password of the user.
6.6.3.1.1 Changing Password of the Current User
Procedure
Step 1 Log in to the PC client.
Step 2 Select the root node
Step 3 Click admin at the upper-right corner, and then select Change Password.
Step 4 Enter the old password, the new password and then confirm the new password.
Step 5 Click OK.
6.6.3.1.2 Changing Password of Other Users

Only users in the admin group have the permission to change passwords of other users.
Procedure
Step 1 Log in to the PC client.
Step 2 Click 📋 on the upper-right corner and then click Account.
You can also click Account from the configuration list on the home page.
Step 3 Select a user and then click under the Attribute tab.
Step 4 Enter the password of the current account, and then click OK.
Step 5 Enter the new password and then confirm the password.
Step 6 Click OK.
6.6.3.2 Resetting the Password
You can use email address or answer the security questions to reset the password if you forgot it.
6.6.3.2.1 Leaving Email Address and Security Questions
Enable the password reset function, leave an email address and set security questions. You can only use the local interface to set security questions.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Account.
You can also click Account from the configuration list on the home page.
Step 3 Select the root node at the upper-left corner.
Step 4 Click to enable the password reset function.
Step 5 Enter an email address for resetting password.
Step 6 Set security questions. You can only set security questions on the local interface of the Device.
Step 7 Click Apply.
6.6.3.2.2 Resetting Password on Local Interface
Procedure
Step 1 Connect a monitor to the Device, and then go to the Login page of the Device.
Step 2 Click Forgot password?
Step 3 Click OK.
Step 4 (Optional) If you have not configured the linked email address, enter the email address and then click Next.
Step 5 Select the reset mode and then reset the password.
- Email.
Follow the on-screen instructions to get the security code in your linked email address. After that, enter the security code and then click Next.
• Security questions.
Answer the security questions and then clickNext.
Step 6 Set parameters.
Table 6-31 Description of password parameters
| Parameter Description | |
| Username The default username is admin. | |
| Password | Enter the new password and confirm the password. |
| Confirm Password | |
| Prompt question | After setting the prompt, when you point to 0 on the login page, the system pops up a prompt to remind you of the password. The password prompt is available only on the login page of the local interface. |
Step 7 Click Confirm Modify.
You can log in with the new password.
6.6.3.2.3 Resetting Password on the Web Interface or PC Client
Prerequisites
Make sure that you have configured the linked email address.
Procedure
Step 1 Enter the IP address of the Device in the address bar of the browser or PC client, and then press Enter.
Step 2 Click Forgot password?
Step 3 Click OK.
Step 4 Follow on-screen instructions to get security code and then enter the security code.
Step 5 Click Next.
Step 6 Set a new password.
Table 6-32 Description of password parameters
| Parameter Description | |
| Username | The default username is admin. |
| Password | Enter the new password and confirm the password. |
| Confirm Password | |
| Prompt question | After setting the prompt, when you point to 📞 on the login page, the system pops up a prompt to remind you of the password. The password prompt is available only on the login page of the local interface. |
Step 7 Click Confirm Modify.
You can log in with the new password.
6.6.4 Adding ONVIF User
The remote devices can connect with the Device through ONVIF protocol by using a verified ONVIF account.

There are 3 ONVIF user groups by default: admin, user, and operator. You can only add users in the 3 groups. You cannot create other ONVIF user groups.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Account.
You can also click Account from the configuration list on the home page.
Step 3 Select an ONVIF user group, and then click.

Figure 6-77 ONVIF user group

Step 4 Enter the login password of current user, and then click OK.
Step 5 Set parameters.
Table 6-33 User attributes parameters
| Parameter Description | |
| Name | Set the username.The name ranges from 1 to 31 characters. It can contain English letters, number and special character ("_ ", "@", "."). |
| Parent Node | Displays the user group that the user belongs to. |
| Password | Enter the password and then confirm it. Set a strong password according to the on-screen prompt. |
| Confirm Password | |
| Description Enter descriptions for the user. | |
Step 6 Click Apply.
Related Operations
Select an ONVIF user, and then click 📋 to delete it.

The admin ONVIF user cannot be deleted.
6.7 System Settings
Log in to the PC client. Click 📋 on the upper-right corner and then select System. You can configure system settings, such as general parameters, time, and display parameters.
6.7.1 Configuring Basic System Parameters
Set system language, standard, user logout time, virtual keyboard, and mouse moving speed.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click System.
You can also click System from the configuration list on the home page.
Step 3 Configure the parameters.
Figure 6-78 Basic system settings

Table 6-34 System parameters description
| Parameter Description | |
| Language Set system language. | |
| Video Standard | Select a video standard.PAL is mainly used in China, Middle East and Europe.NTSC is mainly used in Japan, United States, Canada and Mexico.As a technical standard of processing video and audio signals, PAL and NTSC mainly differ in the encoding and decoding modes and field scanning frequency. |
| Device Name Customize a name for the Device. | |
| Logout Time | Enter the time of inactivity before logout. The Device logs out automatically after the period of inactivity.If you select None, the Device does not automatically log out. |
| Sync Remote Device | Click to synchronize the system settings such as language and time zone with remote devices. |
| Tour | Click to enable tour and then enter the tour time. |
| Virtual Keyboard | Enable virtual keyboard on the local interface.This function is available only on the local interface. |
| Mouse Moving Speed | Set mouse moving speed on the local interface.This function is available only on the local interface. |
Step 4 Click Apply.
6.7.2 System Time
Set system time, and enable the NTP function according to your need. After you enable the NTP function, the Device can automatically synchronize time with the NTP server.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click System.
You can also click System from the configuration list on the home page.
Step 3 Select General > Time.
Figure 6-79 Time

Step 4 Configure the parameters.
Table 6-35 Time parameters description
| Parameters Description | |
| Time | Set system date and time. You can set the time manually or enable NTP so that the Device can automatically synchronize time with the NTP server.Manual Settings:Set the actual date and time in either of the following ways.Click, and then select the time and date in the calendar.ClickSync PCto synchronize system time with your computer.NTP:Enter the IP address or domain of the NTP server, and then set the time synchronization interval. |
| Time Format | Set the time and date format. |
| Time Zone Select a time zone. | |
| CAM Time Sync | After you enable this function, EVS detects the system time of remote devices once in every interval. When the time of a remote device is inconsistent with EVS time, EVS will calibrate the time of the remote device automatically. |
Step 5 (Optional) Set DST.

DST is a system to stipulate local time, in order to save energy. If the country or region where the Device is located follows DST, you can enable DST to ensure that system time is correct.
1) Click ○ to enable DST.
2) Select a DST mode from Date and Week.
3) Set DST start time and end time.
Step 6 Click Apply.
6.7.3 Schedule
Configure schedules. When you are configuring alarm, recording and other settings, you can use the schedule to define the validity periods. The system only triggers the corresponding operations during the specified schedule.

Default Schedule has been created by default, which is always effective and cannot be modified or deleted.
Procedure
Step 1 Log in to the PC client.
Step 2 Click ⚙, or click + on the configuration page, and then select SYSTEM > Schedule > Schedule.
Figure 6-80 Schedule

Step 3 Add a schedule.
1) Click Create.
2) Click to edit the schedule name.
Step 4 Set the validity periods.
• Always: The schedule is always effective.
- Custom: Customize validity periods for the schedule. Click the time bar and then drag the blue strip to set a period.

- You can add up to 50 validity periods for each schedule.
◇ Click Clear to clear all validity periods.
◇ Click a blue strip and then click ☐ to delete the corresponding period.
Step 5 Click Save.
Related Operations
Select a schedule and then click 📋 to delete it.
6.8 Cluster Service
The cluster function, also known as cluster redundancy, is a kind of deployment method that can improve the reliability of device. In the cluster system, there is a number of main devices and another number of sub devices (the N+M mode), and they have a virtual IP address (the cluster IP) for unified login and management. Under normal circumstances, the main devices are in the working state. When the main device fails, the corresponding sub device will take over the job automatically. When the main device recovers, the sub device will transmit the configuration data, cluster IP address and videos recorded during the failure to the main device which then takes over the job again.
In the N+M cluster system, there is a management server, the DCS (Dispatching Console) server, which is responsible for timely and correct scheduling management of the main and sub devices. When you create a cluster, the current EVS is used as the first sub device and the DCS server by default.
6.8.1 Creating a Cluster
Creating a cluster is to add multiple devices into a cluster that requires the addition of main and sub devices and the configuration of cluster IP.
When you create a cluster, the current Device is taken as the first sub device and the DCS server by default, and the priority of the other sub devices is determined by the order in which they are added, with the first sub device being the highest priority.
Figure 6-81 Procedure of creating a cluster

flowchart
graph TD
A["Start"] --> B["Add Main Device"]
B --> C["Add Sub Device"]
C --> D["Set Cluster IP"]
D --> E{Only 2 Devices in Cluster}
E -->|Yes| F["Set Cluster IP"]
E -->|No| G["Enable Cluster"]
G --> H["End"]
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Cluster Management.
You can also click Cluster from the configuration list on the home page.
Step 3 Click Cluster Setting, and then click Enable Cluster.
Figure 6-82 Cluster setting

Step 4 Add a main device.
1) Click Add under Main Device.
Figure 6-83 Add a main device

2) Set parameters.
Table 6-36 Parameters description
| Parameter Description | |
| Device Name | Enter a name for the main device. |
| IP Address | Enter the IP address of the main device. |
| Port Enter the port number. | It is 37777 by default. |
| Username | Enter the login username and password of the Device. |
| Password | |
| Enable Cluster | Select the checkbox to enable cluster, and then enter the cluster IP address, subnet mask and gateway. Cluster IP is a virtual IP that is used to access and manage the main devices and sub devices in the cluster. After logging in with the virtual IP, when the main device fails and the system is switched to the sub device, you can still view live video. |
3) Click OK.
Step 5 Add a sub device.
1) Click Add under Sub Device.
Figure 6-84 Add a sub device

2) Set parameters.
Table 6-37 Parameters description
| Parameter Description | |
| Device Name Enter a name for the sub device. | |
| IP Address | Enter the IP address of the sub device.When adding the first sub device, you do not need to enter the IP address, because the first sub device is the current device by default. |
| Port Enter the port number. | It is 37777 by default. |
| Username | Enter the login username and password of the Device. |
| Password | |
3) Click OK.
Step 6 Click Next.
Step 7 Set the arbitrage IP.
When there are only 2 devices in the cluster, a third-party device is required to determine whether the main device is faulty, so arbitration IP must be set for the cluster to perform a normal replacement operation. The arbitration IP can be the IP address of another device, computer or gateway that is connected to the Device.
Step 8 Click Start Cluster.
Related Operations
• Under the Cluster Services tab, you can:
◇ Click Delete Cluster to delete the cluster.
◇ Click Even Info under Operation to view the event logs of the main device or sub device.
◇ Click Cluster IP under Operation to change the cluster IP.
- Click Delete under Operation to delete the main device or sub device.
- Under the Arbitrage IP tab, you can change the arbitrage IP.
6.8.2 Record Transfer
After the main device has recovered, the videos and images recorded on the sub device during the failure period need to be transferred back to the main device.
Procedure
Step 1 Log in to the PC client.
Step 2 Click on the upper-right corner and then click Cluster Management.
You can also click Cluster Management from the configuration list on the home page.
Step 3 Click the Transfer Record tab, and then click Add.
Figure 6-86 Add a transfer task

Step 4 Configure the parameters.
Table 6-38 Parameters of transfer task
| Parameters Description | |
| Main Device | Enter the IP address of the main device. |
| Sub Device | Enter the IP address of the sub device. |
| Channel No. | Select the channel whose recorded files are to be transferred.Click to set the channel range. |
| Start Time | Set the period during which the files you want to transfer were recorded. |
| End Time | |
Step 5 Click OK.
6.8.3 Viewing Cluster Log
Procedure
Step 1 Log in to the PC client.
Step 2 Click 📋 on the upper-right corner and then click Cluster Management.
You can also click Cluster Management from the configuration list on the home page.
Step 3 Set the search period, and then click Search.
Figure 6-87 Cluster log

6.9 Network Storage
Network storage is a storage technology based on IP network. After you create a storage pool, you can share your storage directory with other devices through iSCSI.
Figure 6-88 Configuring network storage

flowchart
graph TD
A["Start"] --> B["Create Storage Pool"]
B --> C["Create Share Account"]
C --> D["Create Share Folder"]
D --> E["Enable Share Service"]
E --> F["End"]
6.9.1 Creating Storage Pool
Storage pool is a logical storage space after the storage device is virtualized. It is managed by the system, and can be composed of multiple actual disks or RAID. Network storage is one of the major means to realize storage virtualization.

Creating storage pool will format the disk.
Procedure
Step 1 Click, often the home page, select
Network Storage > Storage Pool.
Figure 6-89 Storage pool

Step 2 Click Add.
Step 3 Name the pool, and then select a disk or RAID group.

By default, in the Device Name column, "sdx" (x ranges from a to z) is a disk, such as /dev/sda, and "mdx" (x is number) is a RAID group, such as /dev/md0.
Step 4 Click OK.
The confirmation dialogue box is displayed.
Step 5 Click OK.
The system starts to create storage pool.

- To delete a pool, click .
- To refresh the storage pool list, click Refresh.
6.9.2 Managing Share Account
Use share account to access the shared folder.
Procedure
Step 1 Click, on the home page, select
Network Storage > Storage Pool.
Step 2 Click Add.
Step 3 Set parameters.
| Parameter Description | |
| User Name Name the user. | |
| Service Type You can select | ISCSI, FTP/SAMBA, ISCSI/FTP/SAMABA. |
| Password | Set a password for the user. |
| Confirm password | The password shall be 12-digit if the service type is iSCSI. |
| Remark | Set the remark information for identifying the user. |
Step 4 Click OK.
6.9.3 Configuring Share Folder
Configure the share folders that other users can access remotely.
Procedure
Step 1 Click 📷, or on the home page, select Network Storage > Storage Pool.
Step 2 Click Add.
Step 3 Set parameters.
| Parameter Description | |
| Directory Name Name the folder. | |
| Pool Name | Select a pool.The available free space of the selected pool is displayed beside the pool name. |
| Share Capacity | Set the space of the folder. |
| Block Size | Set the block size of the folder, such as 512 Byte, 1024 Byte, 2048 Byte and 4096 Byte. You need to set block size when the service type is iSCSI. |
| Description | (Optional) Describe the folder for the ease of identifying it. |
| Share Type | You can select from iSCSI, FTP, SAMBA and NFS. |
| Cache Type | Set the cache strategy of the share folder, includingWrite-backandDirect-write.Direct-write: Write data directly into be disk and refresh the cache data. You are recommended to select direct-write when you have less data to store and have a high requirement for data integrity.Write-back: Write data into the cache, and then store it into the disk when the cache is full or system is available. You are recommended to select write-back when you have much more data to store and have a low requirement for data integrity. You need to select the cache type when the service type is iSCSI. |
Step 4 Click OK.

- The system forces to disable automatic maintenance the first time you create a share folder, or when you create a folder when automatic maintenance is enabled automatically. Once you have configured network storage, you can manually enable automatic maintenance.
- Click 📋 to delete a share folder; click 📋 to edit a share folder; click Refresh to refresh the current configuration.
- Modifying cache type takes effect after the Device restarts.
6.9.4 Configuring Share Control
Users can access the share folders only when the share service is enabled.
Procedure
Step 1 Click 📷, or on the home page, select Network Storage > Storage Pool.
Step 2 Click to enable share service.
Step 3 Click OK.
7 System Maintenance
7.1 Overview
Log in to the PC client. On the home page, select Maintain > Overview.
Figure 7-1 Overview

7.2 System Information
7.2.1 Viewing Device Information
Log in to the PC client. On the home page, select Maintain > System Info > Device Info. You can view device information such as input bandwidth, system version, and web version.
7.2.2 Viewing Legal Information
Log in to the PC client. On the home page, select Maintain > System Info > Legal Info. You can view the software license agreement, privacy policy, and open-source software note.
7.2.3 Viewing Storage Information
Log in to the PC client. On the home page, selectMaintain > System Info > Storage Info. You can view the storage information of each channel.
Figure 7-2 Storage information
| Channel No. | IP Address | Camera Name | Record Status | Stream Type | Resolution | Frame Rate (FPS) | Type | Storage Mode | Used Space/Total... | ANR | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 1 | 10 | auto_chr_BHUH_ | Auto | - | - | - | Scheduled | Disk Group | - | Close | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 2 | 10 | 24 | Auto | - | - | - | Scheduled | Disk Group | - | Close | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 3 | 10 | 10 | Auto | - | - | - | Scheduled | Disk Group | - | Close | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 4 | 10 | Channel4 | Auto | - | - | - | Scheduled | Disk Group | - | Close | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 5 | 10 | Channel5 | Auto | - | - | - | Scheduled | Disk Group | - | Close | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 6 | 10 | Channel6 | Auto | - | - | - | Scheduled | Disk Group | - | Close | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 7 | 10 | Channel7 | Auto | - | - | - | Scheduled | Disk Group | - | Close | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 8 | 10 | Channel8 | Auto | - | - | - | Scheduled | Disk Group | - | Close | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 9 | 10 | Channel9 | Auto | - | - | - | Scheduled | Disk Group | - | Close | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 10 | 10 | Channel10 | Auto | - | - | - | Scheduled | Disk Group | - | Close | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 11 | 10 | Channel11 | Auto | - | - | - | Scheduled | Disk Group | - | Close | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 12 | 10 | Channel12 | Auto | - | - | - | Scheduled | Disk Group | - | Close | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 13 | 10.0000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 |
7.3 System Resources
Log in to the PC client. On the home page, select Maintain > System Resources > Device
Resource. You can view resource status including CPU and memory usage, mainboard temperature and fan speed.
Figure 7-3 System resources

- Click ▼ to select the items that you want to view.
- Click Refresh to refresh the data.
7.4 Network Maintenance
7.4.1 Online User
Manage the online user that can access the Device. You can block a user from access for a period of time. During the block period, the selected user cannot access the Device.

You cannot block yourself or admin user.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Maintain > Network Maintenance > Online User.

The list displays currently connected users.
Figure 7-4 Online user

Step 3 Block one or more users.
- Block one by one: Click ⊙ corresponding to the user.
- Block in batches: Select multiple users and then click Block.
Step 4 Set the block period. The default period is 30 minutes.
Step 5 Click OK.
7.4.2 Network Test
You can test network connection and capture packets. Packet capture is the practice of intercepting a data packet that is crossing or moving over a specific computer network. The captured packet is stored temporarily for analysis. The packet is inspected to help diagnose and solve network problems and determine whether its structure follows network security policies.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Maintain > Network Maintenance > Network Test.
Figure 7-5 Network test

Step 3 In the Network Test section, enter the target address, and then click Test.
After testing is completed, the test result is displayed. You can check the evaluation for average delay, packet loss, and network status.
Step 4 In the Packet Capture section, click ▷ to start capturing the packets of the corresponding NIC, and then click to stop.

- You cannot capture packets of several NICs at the same time.
- During packet capturing, you can go to other pages for operation and go back to the Network Test page later to stop packet capturing.
Step 5 Click ↓ to download the captured packet.
7.5 Disk Maintenance
Check the disk status to handle disk errors in time.
7.5.1 S.M.A.R.T Detection
Run S.M.A.R.T detection to check HDD status.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Maintain > Disk Maintenance > S.M.A.R.T Detection.
Step 3 Set the detection period.
Step 4 Click OK.
7.5.2 System Disk Health Detection
On the home page, select Maintain > Disk Maintenance > System Disk Health Detection, and then you can view the storage allocation and remaining P/E cycle of system disk.
Figure 7-6 System Disk health detection

pie
Allocation Total(117.24GB) | Category | Allocation (%) | | :--- | :--- | | History Snapshot Database | 4.21MB 0.0% | | Other | 124.33MB 0.1% | | Idle | 117.12GB 99.9% | Remaning P/E Cycle | Category | Percentage (%) | | :--- | :--- | | 100% | | | 60% | | | 40% | | | 40% | | | 20% | | | 0% | 2012-11 | | Date | |7.5.3 Firmware Update
Import update file to update HDD information.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Maintain > Disk Maintenance > Firmware Update.
Step 3 Click Download Template to download the update template
Step 4 Click, select Download, and then open and fill in the downloaded template.
Step 5 Select a disk, click Import Firmware Info, click Browse to choose the template to be imported, and then click OK.
Step 6 Click Firmware Update to update the firmware information.
Step 7 Click Detect Firmware to refresh the firmware information on the page.
7.5.4 Health Monitoring
Monitors the disk operation status.
On the home page, select Maintain > Disk Maintenance > Health Monitoring

Only supports Dahua Disk.
Figure 7-7 Health monitoring

7.6 Logs
The logs record all kinds of system running information. We recommend you check the logs periodically and fix the problems in time.
7.6.1 Log Classification
Table 7-1 Log categories
| Log Type | |
| System log | Logs of system running status, file management, hardware detection and scheduled task. |
| User operation log | User operation and user configuration logs. |
| Event log | Logs of different events, such as IP conflict, MAC conflict, login lock, and stay detection. |
| Connection log | Logs of user login and logout, session hijack, session blast and camera list. |
7.6.2 Log Search
You search for different categories of logs. This section uses system logs as an example.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Maintain > Log > System Logs.
Step 3 Set the search period, and then select the log type.
Step 4 (Optional) Click >> , and then select a log level.
Step 5 Click Search.
Figure 7-8 System logs

Related Operations
- Export logs.
Click Export to export the logs. You can select whether to encrypt the exported logs.
Select Yes, set a password, and then click OK. The exported logs will be encrypted. The password is required to unzip the exported file.
If you select No, the logs will be exported to your computer or USB storage device without encryption.

Keep the unencrypted logs safe to prevent data leakage.
- Clear logs.
Click Clear all to clear all the logs.

You might be unable to track the reasons of system errors if you clear logs.
7.7 Intelligent Diagnosis
7.7.1 One-click Export
Export the diagnosis data for troubleshooting when the Device is in exception.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Maintain > Intelligent Diagnosis > Export.
Step 3 Click Generate Diagnosis Data to generate diagnosis data.
Step 4 Click Export to export the diagnosis results.
7.7.2 Run Log
View system run logs for troubleshooting.

Make sure that you have enabled Run Log in Security > System Service. Otherwise there is no log data.
Log in to the PC client. On the home page, select Maintain > Intelligent Diagnosis > Run Log.

The logs might be overwritten when the storage space runs out. Back up the logs in time.
- Export logs one by one: Click ↓ to export a log.
- Export logs in batches: Select multiple logs, and then click Export.
7.7.3 One-click Diagnosis
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Maintain > Intelligent Diagnosis > One-click Diagnosis.
Step 3 Click Diagnose, and then click the Details to view the corresponding diagnosis information.
7.8 Maintenance Manager
To clear the malfunction or error during the system operation and enhance operation performance, you can restart the Device, restore factory default setup, update the system and more.
7.8.1 Update
7.8.1.1 Updating the Device
You can import the update file to update the system version of the Device. The extension name of the update file is .bin.
Prerequisites
You need to obtain the correct update file and save it in the corresponding path.
- When operating on the local interface, save the update file in the USB storage device and then connect the USB storage device to the EVS.
- When operating on the web interface or PC client, save the update file on your computer.

- During update, do not disconnect the Device from power and network, or restart or shut down the Device.
- Make sure that the update file is correct. Improper update file might result in device error.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Maintain > Manager > Update > Host Update.
Step 3 Click Import Update File to select an update file.
Step 4 Click OK.
The system starts updating. The Device automatically restarts after successfully updated.
7.8.1.2 Updating Cameras
You can import the update file to update the cameras.
Prerequisites
You need to obtain the correct update file and save it in the corresponding path.
- When operating on the local interface, save the update file in the USB storage device and then connect the USB storage device to the EVS.
- When operating on the web interface or PC client, save the update file on your computer.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Maintain > Manager > Update > Camera Update.
Step 3 Select one or more cameras and then click File upgrade.

Stop recording before update. If you are updating a camera that is recording, the system will prompt you to disable recording first.
Step 4 Click Browse to select an update file.
Step 5 Click Update Now.
Step 6 Click OK.
7.8.2 Default
When the system runs slowly and has configuration errors, try to solve the problems by restoring the default settings.

All configurations are lost after factory default operation.
Procedure
Step 1 Log in to the PC client.
Step 2 On the home page, select Maintain > Manager > Default
Figure 7-9 Default

Step 3 Select a method between Quick Restoration and Custom Restoration.
Step 4 Click OK.
The system begins to restore default settings. After that, the system prompts you to restart the Device.
7.8.3 Automatic Maintenance
If the device has run for a long time, you can set the Device to automatically restart at idle time.
Procedure
Step 1 Log in to thee PC client.
Step 2 On the home page, select Maintain > Manager > Maintenance.
Figure 7-10 Auto Maintain

Step 3 Set the automatic time.
Step 4 Click to enable emergency maintenance.
When an upgrade power outage, running error and other problems occur, and you cannot log in, you can restart or update the Device, and clear configurations through emergency maintenance.

To use the function, make sure that you have installed Device Diagnostic Tool.
Step 5 Click Apply.
7.8.4 Backing up Configurations
You can export the configuration file of the Device to your computer or a USB storage device for backup. When the configurations are lost due to abnormal operation, you can import the backup configuration file to restore system configurations quickly.
Exporting Configuration File
On the home page, select Maintain > Manager > Config Backup. Click Export to export the configuration file. The file storage path varies depending on the interface you are operating.
- On the PC client, click, and then select Download to view file saving path.
- On the local interface, you can select the file storage path.

Connect USB device to the Device if you are operating on the local interface.
- On the web interface, files are saved to the default downloading path of the browser.
Importing Configuration File
Click Browse to select the configuration file, and then click Import. After the configuration file is imported successfully, the Device will restart automatically.
8 PC Client
After installing the PC client, you can access the Device remotely through the PC client to carry out system configuration, function operations and system maintenance.

For details on installing the PC client, see "3.3.1 Logging in to the PC Client".
8.1 Page Description
Double-click the shortcut icon of the PC client on the desktop of your computer.
Figure 8-1 Taskbar

Table 8-1 Icons
| Icon Description | |
| PCAPP Please Enter URL | Address bar: Enter the IP address of the Device. |
| → | Enter IP address and then click the button to go to the login page. The icon turns into .Click to refresh the page. |
| ≡ | View history login records, downloads, client settings and client version. |
| - | Minimize the client. |
| ☐ | Maximize the client. |
| _y | Display the client at full screen. |
| × | Close the client. |
8.2 History Record
Click, and then select History.
You can view history access records and clear cache.
- Click Clear History to clear all history records.
- Click Clear Cache to clear cache data, and restart the PC client.
8.3 Viewing Downloads
To view and clear history downloads, click and then select Download. The Downloads window is displayed.
- Double-click a file name to open it.
- Click Displayed in Folder to open the folder where the file is located.
- Click Clear to clear history download records.
8.4 Configuring the Client Settings
When the theme of your computer is not Areo, videos might not be displayed normally on the PC client. We recommend you switch the computer theme to Areo, or enable the compatibility mode of the client.
Switching Computer Theme

This section uses Windows 7 as an example.
Right-click any blank position on the computer desktop, select Personalize, and then switch to Aero theme. Restart the PC client to make the Aero theme take effect.
Setting Video and Picture Storage Path
Click Browse to specify the paths for saving videos and pictures. This function is available only on the PC client.
Enabling Compatibility Mode
Click , and select Settings. Select the checkbox to enable Compatibility Mode. Restart the PC client to make the compatibility mode take effect.
Enabling Hardware Acceleration
Click , and select Settings. Select the checkbox to enable Enable hardware acceleration (it will take effect after video is opened again).
The live videos become more fluent when this function is enabled.
8.5 Viewing the Client Version
Click and then select About to view the client version.
9 Log Out, Restart, Shut Down, Lock
Log out of, restart, shut down and lock out the Device.
Figure 9-1 User operation

Logging Out
Click

select
Logout
Restart
Click

Restart, and then click OK.
Shutting Down

Shutting down the Device by unplug the power cable might cause data loss, and is not recommended.
- Mode 1 (recommended): Click,

Shutdown, and then click OK.
- Mode 2: Press the power button on the Device.
- Mode 3: Unplug the power cord.
Locking
Click

select
Lock to lock the screen. The locked client cannot be operated.
To unlock the client, click anywhere on the client, and then the Unlock window appears. Enter the username and password, and then click OK. You can also click Switch User to switch to another user account.
Appendix 1 Glossary
Appendix Table 1-1 Glossary
| Name Description | |
| CGI | Common Gateway Interface (CGI) is an important Internet technology. With CGI, client can ask data from program running on network server. CGI describes data transmission standard between server and asking processing program. |
| DDNS | Dynamic Domain Name System (DDNS) is to map the user dynamic IP address to a specified domain analysis service. Each time, when the user connects to the network, the client can transmit the host dynamic address to the server application on the host of the service provider. The server applications are to provide the DNS service and realize dynamic domain analysis. That is to say, the user does not need to remember the changeable IP address, just uses the domain name to login the device or the address. |
| DHCP | Dynamic Host Configuration Protocol (DHCP) is a network protocol in the LAN. It is to automatically allocate IP address for the internal network or the ISP (Internet service provider).It is to manage the computer IP address by the unified means of management. |
| DNS | Domain Name System (DNS) is to save the all host domain name and corresponding IP address in the network. It has the ability to change the domain to the IP address. |
| DVR Digital Video Recorder. | |
| FTP | File Transfer Protocol (FTP) is used to control bilateral transmission of file on the Internet. |
| HDMI | High Definition Multimedia Interface (HDMI) is a special digital interface suitable for audio/video transmission. It can transmit audio signal and video signal at the same time. |
| HTTPS | Hyper Text Transfer Protocol over Secure Socket Layer (HTTPS) is a HTTP channel for security purpose. The HTTPS has defined the browser the world wide web service safety communication rule. It adopts encryption technology to guaranty safety access to the webpage. |
| IP Internet Protocol. | |
| IPC IP Camera. | |
| NTP | Network Time Protocol (NTP) is a protocol to synchronize computer time. It adopts wireless network protocol UDP, so that the computer time synchronizes with the server or the time source. It is to provide time correction of high accuracy. |
| NTSC | National Television Standards Committee, American national standard television and broadcast transmission and receiving protocol. This is a television standard that television scanning beam is 525 beams, 30 frames per second, interlaced scanning, odd field first and then it is followed by even field. NTSC is used in the United States of America, Japan, and so on. |
| NVR Network Video Recorder | |
| MTU | Maximum Transmission Unit (MTU) refers to the maximum data packet amount (byte) on one layer of the communication protocol. |
| ONVIF | Open Network Video Interface Forum (ONVIF) is the defined general protocol for information exchange among the network video devices. It includes search device, real-time audio/video, metadata, information control, and so on. |
| PAL | Phase Alteration Line, this is a television standard that television scanning beam is 625 beams, 25 frames per second, phase alteration, odd field first and then it is followed by even field. PAL color encoding is used. PAL is used in China, Europe, and so on. |
| PTZ | Pan Tilt Zoom (PTZ) refers to the PTZ all-direction movement, lens zoom, and focus control. |
| S.M.A.R.T | Self-Monitoring Analysis and Reporting Technology (S.M.A.R.T) is a technical standard to detect HDD drive status and report potential problems. |
| SSH | Secure Shell (SSH) is a security protocol formulated by IETF network group on the basis of application layer. SSH protocol can effectively prevent information leakage problem during remote management. |
| SVC | Scalable Video Coding (SVC) is a video encoding technology. It can split the video streams to one basic layer and several enhanced layers according to the requirements. The basic layer provides the general video quality, frame rate and resolution, and the enhanced layer is to perfect the video quality. |
| VGA | Video Graphics Array (VGA) is a video transmission standard. It has high resolution, high display speed and abundant colors. |
| WLAN | Wireless Local Area Networks (WLAN) adopts radio frequency to realize data transmission. |
Appendix 2 Mouse and Keyboard Operations
This section introduces mouse and keyboard operations.
Appendix 2.1 Mouse Operations
Connect mouse to the USB port, you can use the mouse to control the local menu. For details, see the following table.
Appendix Table 2-1 Mouse operations
| Operation Description | |
| Click (click the left mouse button) | Click to select a function menu, to enter the corresponding menu page.Implement the operation indicated on the control.Change checkbox and option button status.Click the checkbox to display drop-down list.On virtual keyboard, select letter, symbol, English upper letter and lower letter, and Chinese characters. |
| Double-click (click the left mouse button twice) | On the LIVE page, double-click one video window to zoom in the window. Click any position out of the window, so the video window restores original size.On the LIVE page, double-click the remote device in the device tree. Switch to video edit status, and add remote device.Double-click the image or record file thumbnail, to playback record file or view the image. |
| Right-click (click the right mouse button) | On the LIVE or SEARCH page, right-click one video window to display the shortcut menu.On the LIVE page, right-click the view in the list or the remote device in the device tree, to display the shortcut menu. |
| Wheel button | On the SEARCH page, mpoint to the time bar, and then click the mouse wheel, to adjust the accurate time on the time bar.Click the control that needs to input number (such as input date or time). Roll the mouse wheel to adjust the number value. |
| Drag the mouse | Drag the mouse pointer to select the motion detect zone.On the LIVE page, drag the remote device in the device tree to the play window, switch to the view status. It is to add the remote device.On the SEARCH page, drag the record file or the image thumbnail to the playback window. It is to play back the corresponding record file or image. |
Appendix 2.2 Virtual Keyboard
The local menu supports virtual keyboard.
Click the text box to display virtual keyboard. For details, see the following pictures and table.

If the device has connected to the peripheral keyboard, click the text column. Virtual keyboard will disappear.
Appendix Figure 2-1 Virtual keyboard (global keyboard)

Appendix Figure 2-2 Virtual keyboard (digital keyboard)

Appendix Figure 2-3 Virtual keyboard (input letter)
![[ ] { } # % ^ * + = _ \ | ~ < > @ $ & rtsp ` " ; / : - ( ) // com . , ? ! ' ← abc En ← → ←](/content/2026/05/893196/images/5fda6be688a9cae6d9cffa3e76505fe6bc65ae90f077b835566643c7067ac126.jpg)
Appendix Table 2-2 Virtual keyboard icon
| Signal Words Description | |
| Click the icon to switch to upper case. The icon becomes ↑. Click ↑ to switch to lower case. | |
![]() | Click to delete letter. |
![]() | Click to input letter. Now the icon turns intoabc.Clickabcto restore previous input mode. |
| [BH0C] | Click to input space. |
click to control cursor position. | |
![]() | Click to switch to the next line. |
![]() | Select text and click the icon to cut the selected contents. |
![]() | Select text and click the icon to copy the selected contents. |
| [SWCD] | Cut or copy the contents, click the text box and click the icon to paste the contents. |
Appendix 3 RAID
RAID is an abbreviation for Redundant Array of Independent Disks. It is to combine several independent HDDs (physical HDD) to form a HDD group (logic HDD).
Comparing with one HDD, RAID provides more storage capacity and data redundancy. The different redundant arrays have different RAID level. Each RAID level has its own data protection, data availability and performance degree.
RAID Level
| RAID Level | Description | Min. HDD Needed |
| RAID0 | RAID 0 is called striping.RAID 0 is to save the continued data fragmentation on several HDDs. It can process the read and write at the same time, so its read/write speed is N (N refers to the HDD amount of the RAID 0) times as many as one HDD. RAID 0 does not have data redundant, so one HDD damage might result in data loss that cannot be restored. | 2 |
| RAID1 | It is also called mirror or mirroring.RAID 1 data is written to two HDDs equally, which guarantee the system reliability and can be repaired. RAID 1 read speed is almost close to the total volume of all HDDs. The write speed is limited by the slowest HDD. At the same time, the RAID 1 has the lowest HDD usage rate. It is only 50%. | |
| RAID5 | RAID5 is to save the data and the corresponding odd/even verification information to each HDD of the RAID5 group and save the verification information and corresponding data to different HDDs. When one HDD of the RAID5 is damaged, system can use the rest data and corresponding verification information to restore the damaged data. It does not affect data integrity. | 3 |
| RAID6 | Based on the RAID5, RAID6 adds one odd/even verification HDD. The two independent odd/even systems adopt different algorithm, the data reliability is very high. Even two HDDs are broken at the same time, there is no data loss risk.Comparing to RAID5, the RAID6 needs to allocate larger HDD space for odd/even verification information, so its read/write is even worse. | 4 |
| RAID10 | RAID 10 is a combination of the RAID 1 and RAID 0. It uses the extra high speed efficient of the RAID 0 and high data protection and restores capability of the RAID 1. It has high read/write performance and security. However, the RAID 10 HDD usage efficiency is as low as RAID 1. | |
| RAID50 | RAID50 is a combination of the RAID5 and RAID0. It has higher fault-tolerance. There is no data loss even one HDD in the set malfunctions. | 6 |
| RAID60 | RAID60 is a combination of the RAID6 and RAID0. It has higher fault-tolerance and read performance. There is no data loss even two HDDs in one set malfunctions. | 8 |
RAID Capacity
See the sheet for RAID space information.
Capacity N refers to the mini HDD amount to create the corresponding RAID.
| RAID Level Total Space of the N HDD | |
| RAID0 The total amount of current RAID group | |
| RAID1 Min (capacity N) | |
| RAID5 (N-1) ×min (capacity N) | |
| RAID6 (N-2) ×min (capacityN) | |
| RAID10 (N/2)×min (capacityN) | |
| RAID50 (N-2) ×min (capacity N) | |
| RAID60 (N-4) ×min (capacity N) | |
Appendix 4 HDD Capacity Calculation
HDD capacity calculation formula:
Total capacity (M) = Channel number × Demand time length (hour) × HDD capacity occupied per hour (M/hour)
According to the above formula, get recording time calculation formula.
Recording time (hour) =
Total capacity (M)
HDD capacity occupied per hour (M/hour)×Channelnumbner
For example, for single-channel recording, HDD capacity occupied per hour is 200 M/hour. Use 4-channel device to make 24-hour continuous recording in every day of one month (30 days), the required HDD space is: 4 channels×30 days×24 hours×200 M/hour = 576 G. Therefore, five 120 G HDD or four 160 G HDD shall be installed.
According to the above formula, at different stream values, recording file size of 1 channel in 1 hour is shown as follows (for your reference):
Appendix Table 4-1 HDD capacity calculation
| Bit stream Size (max.) | File Size | Bit Stream Size (max.) | File Size |
| ≤ 96 K | 42 M | 128 K | 56 M |
| 160 K | 70 M | 192 K | 84 M |
| 224 K | 98 M | 256 K | 112 M |
| 320 K | 140 M | 384 K | 168 M |
| 448 K | 196 M | 512 K | 225 M |
| 640 K | 281 M | 768 K | 337 M |
| 896 K | 393 M | 1024 K | 450 M |
| 1280 K | 562 M | 1536 K | 675 M |
| 1792 K | 787 M | 2048 K | 900 M |
Appendix 5 Particulate and Gaseous Contamination Specifications
Appendix 5.1 Particulate Contamination Specifications
The following table defines the limitations of the particulate contamination in the operating environment of the device. If the level of particulate contamination exceeds the specified limitations and result in device damage or failure, you need to rectify the environmental conditions.
Appendix Table 5-1 Particulate contamination specifications
| Particulate contamination | Specifications |
| Air filtration | Class 8 as defined by ISO 14644-1. |
| Conductive dust | Air must be free of conductive dust, zinc whiskers, or other conductive particles. |
| Corrosive dust | Air must be free of corrosive dust. Residual dust present in the air must have a deliquescent point less than 60% relative humidity. |
Appendix Table 5-2 ISO 14644-1 cleanroom classification
| Class Maximum particles/m ^3 | ||||||
| — | ≥ 0.1 μm | ≥ 0.2 μm | ≥ 0.3 μm | ≥ 0.5 μm | ≥ 1 μm | ≥ 5 μm |
| Class 1 10 2 | — — — — | |||||
| Class 2 | 100 | 24 | 10 | 4 | — | — |
| Class 3 | 1000 | 237 | 102 | 35 | 8 | -7 |
| Class 4 | 10000 | 2370 | 1020 | 352 | 83 | — |
| Class 5 | 100000 | 23700 | 10200 | 3520 | 832 | 29 |
| Class 6 | 1000000 | 237000 | 102000 | 35200 | 8320 | 293 |
| Class 7 | — | — | — | 352000 | 83200 | 2930 |
| Class 8 | — | — | — | 3520000 | 832000 | 29300 |
| Class 9 | — | — | — | — | 8320000 | 293000 |
Appendix 5.2 Gaseous Contamination Specifications
Usually indoor and outdoor atmospheric environments contain a small amount of common corrosive gas pollutants. When these mixed or single corrosive gas pollutants react with other environmental factors such as temperature or relative humidity in the long term, the device might suffer from a risk of corrosion and failure. The following table defines the limitations of the gaseous contamination in the operating environment of the device.
Appendix Table 5-3 Gaseous contamination specifications
| Gaseous contamination | Specifications |
| Copper coupon corrosion rate | < 300 Å/month per Class G1 as defined by ANSI/ISA71.04-2013 |
| Silver coupon corrosion rate | < 200 Å/month per Class G1 as defined by ANSI/ISA71.04-2013 |
Appendix Table 5-4 ANSI/ISA-71.04-2013 classification of reactive environments
| Class | Copper Reactivity | Silver Reactivity | Description |
| G1 (mild) | < 300 Å/month | < 200 Å/month | Corrosion is not a factor in determining equipment reliability. |
| G2 (moderate) | < 1000 Å/month | < 1000 Å/month | Corrosion effects are measurable and corrosion might be a factor. |
| G3 (harsh) | < 2000 Å/month | < 2000 Å/month | High probability that corrosive attack will occur. |
| GX (severe) | ≥ 2000 Å/month | ≥ 2000 Å/month | Only specially designed and packaged devices are expected to survive. |
Appendix 6 Cybersecurity Recommendations
Cybersecurity is more than just a buzzword: it's something that pertains to every device that is connected to the internet. IP video surveillance is not immune to cyber risks, but taking basic steps toward protecting and strengthening networks and networked appliances will make them less susceptible to attacks. Below are some tips and recommendations from Dahua on how to create a more secured security system.
Mandatory actions to be taken for basic device network security:
1. Use Strong Passwords
Please refer to the following suggestions to set passwords:
- The length should not be less than 8 characters.
- Include at least two types of characters; character types include upper and lower case letters, numbers and symbols.
- Do not contain the account name or the account name in reverse order.
- Do not use continuous characters, such as 123, abc, etc.
- Do not use overlapped characters, such as 111, aaa, etc.
2. Update Firmware and Client Software in Time
- According to the standard procedure in Tech-industry, we recommend to keep your device (such as NVR, DVR, IP camera, etc.) firmware up-to-date to ensure the system is equipped with the latest security patches and fixes. When the device is connected to the public network, it is recommended to enable the "auto-check for updates" function to obtain timely information of firmware updates released by the manufacturer.
- We suggest that you download and use the latest version of client software.
"Nice to have" recommendations to improve your device network security:
1. Physical Protection
We suggest that you perform physical protection to device, especially storage devices. For example, place the device in a special computer room and cabinet, and implement well-done access control permission and key management to prevent unauthorized personnel from carrying out physical contacts such as damaging hardware, unauthorized connection of removable device (such as USB flash disk, serial port), etc.
2. Change Passwords Regularly
We suggest that you change passwords regularly to reduce the risk of being guessed or cracked.
3. Set and Update Passwords Reset Information Timely
The device supports password reset function. Please set up related information for password reset in time, including the end user's mailbox and password protection questions. If the information changes, please modify it in time. When setting password protection questions, it is suggested not to use those that can be easily guessed.
4. Enable Account Lock
The account lock feature is enabled by default, and we recommend you to keep it on to guarantee the account security. If an attacker attempts to log in with the wrong password several times, the corresponding account and the source IP address will be locked.
5. Change Default HTTP and Other Service Ports
We suggest you to change default HTTP and other service ports into any set of numbers between
1024–65535, reducing the risk of outsiders being able to guess which ports you are using.
6. Enable HTTPS
We suggest you to enable HTTPS, so that you visit Web service through a secure communication channel.
7. MAC Address Binding
We recommend you to bind the IP and MAC address of the gateway to the device, thus reducing the risk of ARP spoofing.
8. Assign Accounts and Privileges Reasonably
According to business and management requirements, reasonably add users and assign a minimum set of permissions to them.
9. Disable Unnecessary Services and Choose Secure Modes
If not needed, it is recommended to turn off some services such as SNMP, SMTP, UPnP, etc., to reduce risks.
If necessary, it is highly recommended that you use safe modes, including but not limited to the following services:
- SNMP: Choose SNMP v3, and set up strong encryption passwords and authentication passwords.
- SMTP: Choose TLS to access mailbox server.
- FTP: Choose SFTP, and set up strong passwords.
- AP hotspot: Choose WPA2-PSK encryption mode, and set up strong passwords.
10. Audio and Video Encrypted Transmission
If your audio and video data contents are very important or sensitive, we recommend that you use encrypted transmission function, to reduce the risk of audio and video data being stolen during transmission.
Reminder: encrypted transmission will cause some loss in transmission efficiency.
11. Secure Auditing
- Check online users: we suggest that you check online users regularly to see if the device is logged in without authorization.
- Check device log: By viewing the logs, you can know the IP addresses that were used to log in to your devices and their key operations.
12. Network Log
Due to the limited storage capacity of the device, the stored log is limited. If you need to save the log for a long time, it is recommended that you enable the network log function to ensure that the critical logs are synchronized to the network log server for tracing.
13. Construct a Safe Network Environment
In order to better ensure the safety of device and reduce potential cyber risks, we recommend:
- Disable the port mapping function of the router to avoid direct access to the intranet devices from external network.
- The network should be partitioned and isolated according to the actual network needs. If there are no communication requirements between two sub networks, it is suggested to use VLAN, network GAP and other technologies to partition the network, so as to achieve the network isolation effect.
- Establish the 802.1x access authentication system to reduce the risk of unauthorized access to private networks.
- Enable IP/MAC address filtering function to limit the range of hosts allowed to access the
device.
More information
Please visit Dahua official website security emergency response center for security announcements and the latest security recommendations.
ENABLING A SAFER SOCIETY AND SMARTER LIVING
WARNING
WARNING
CAUTION
TIPS
NOTE














Filter icon. Click the icon to set filter criteria.

Text column. Enter number, letter, symbol and so on.
Click
to view the password requirement.
Please be advised that changing MTU value might result in NIC restart, network offline and affect current running operation.
You can view the live video only when the admin password of the remote device is admin, or the same as the admin password of the Device.
_When Manufacturer is Register, you need to configure this parameter.
_When Manufacturer is Onvif or Onvifs, you need to configure this parameter.

—When operating on [8806]: local interface, you need to insert a USB storage device into the Dev


After you set alarm linkage snapshot, the system exports detected images and panoramic images at the time of snapshot.
When operating on the local interface, you need to insert a USB storage device into the Device.












The name can only contain numbers, letters, underscores, and middle lines.
The name can only contain numbers, letters, and underscores.
Different levels of RAID might need different number of disks.
Please be advised that formatting will clear all data on the RAID.
Please be advised that deletion will clear all data on the RAID and destroy the RAID group.
The password prompt is available only on the login page of the local interface.
The password prompt is available only on the login page of the local interface.
Set a strong password according to the on-screen prompt.
Cluster IP is a virtual IP that is used to access and manage the main devices and sub devices in the cluster. After logging in with the virtual IP, when the main device fails and the system is switched to the sub device, you can still view live video.
You need to set block size when the service type is iSCSI.
You need to select the cache type when the service type is iSCSI.

click to control cursor position.

