| Product Type | MPPT Solar Charge Controller |
| Model | SYN 100-XH-30 |
| Brand | Growatt |
| Max PV Input Voltage | 150 VDC |
| Max PV Input Power | 1200 W (12V system) / 2400 W (24V) / 4800 W (48V) |
| Rated Charge Current | 100 A |
| Battery Voltage (Auto-detect) | 12 / 24 / 36 / 48 V |
| Max. Conversion Efficiency | 98% |
| Standby Power Consumption | < 2 W |
| Dimensions (L x W x H) | 300 x 200 x 100 mm |
| Weight | 3.0 kg |
| Display | LCD with backlight |
| Communication Ports | RS485, USB (optional) |
| Protections | Reverse polarity, overcharge, over-discharge, short circuit, over-temperature |
| Operating Temperature Range | -20°C to +55°C |
| Cooling Method | Natural convection |
| Enclosure Rating | IP20 |
| Compliance | CE, RoHS |
| Maintenance | Periodic cleaning of heatsink, check wiring connections |
| Repairability | Designed for professional repair; replaceable fan (if equipped) |
Frequently Asked Questions - SYN 100-XH-30 Growatt
User questions about SYN 100-XH-30 Growatt
0 question about this device. Answer the ones you know or ask your own.
Ask a new question about this device
Download the instructions for your Controller in PDF format for free! Find your manual SYN 100-XH-30 - Growatt and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. SYN 100-XH-30 by Growatt.
USER MANUAL SYN 100-XH-30 Growatt
natural_image
Simple line drawing of a rectangular device with four small components attached to the base (no text or symbols)(3) Screw for front panel
(8) COM wiring port

(4) Mounting bracket
(9) Waterproof plugs
(5)Grid wiring port
2. Installation
System overview

flowchart
graph TD
A["Battery"] --> B["Inverter"]
B --> C["Backup Box"]
C --> D["Normal Loads"]
D --> E["Meter"]
E --> F["CT"]
F --> G["Power cable"]
F --> H["Communication cable"]
style A fill:#f9f,stroke:#333
style B fill:#ccf,stroke:#333
style C fill:#cfc,stroke:#333
style D fill:#fcc,stroke:#333
style E fill:#cff,stroke:#333
style F fill:#ffc,stroke:#333
style G fill:#fcc,stroke:#333
style H fill:#ffc,stroke:#333
Note:
- The critical load power depends on the power rating of the inverter and battery.
- The off-grid function is only available when the XH inverter is paired with the APX battery system and the backup box.
2.1 Electrical parameters
| Model name | SYN 100-XH-30 |
| Nominal grid voltage | 3W/N/PE230/400 a.c.V |
| Range of grid voltage | 312 ~ 485 a.c.V |
| Max. grid current | 125 a.c.A |
| Max. continuous grid current | 90 a.c.A |
| Nominal grid frequency | 50/60Hz |
| Range of grid frequency | 45 ~ 65Hz |
| Max. continuous inverter input current | 58 a.c.A |
| Max. backup output current | 58 a.c.A |
2.3 Installation steps
- Choose a suitable installation position. The SYN 100-XH-30 can be mounted on a solid wall, a stud frame or a pole and keep it free from direct sunlight.
- To ensure heat dissipation, please maintain at least a 300 mm clearance between the SYN 100-XH-30 and other objects.
- Place the mounting bracket against the wall/pole and mark the drilling hole positions.
- Drill holes and mount the bracket. Ensure that the bracket is securely installed.
- Install the SYN 100-XH-30 onto the mounting bracket.




natural_image
Diagram showing a small rectangular object and a brick wall with a small rectangular component, no text or symbols present.Dimensions (Unit: mm)
Unit: mm

2.4 Required tools

| No. | Name | Size | No. | Name | Size |
| 1 | Flat-blade screwdriver | 2\&5 mm | 2 | Hammer | / |
| 3 | Allen wrench | 5 mm | 4 | Phillips screwdriver | 5 mm |
| 5 | Electric drill | 6 mm | 6 | Wire stripper | / |
| 7 | Pliers | / |
3. Recommended cable specifications
Please prepare suitable cables for the connection of the SYN box following the recommended specifications, and the stripped length of the cables is 10 mm.
| Cable | Cable outer diameter | Cable length |
| Grid input cable | 4-6 AWG | 10 m |
| Inverter input cable | 6-8 AWG | 20 m |
| Load output cable | 6-8 AWG | 20 m |
| Communication cable | 22-26 AWG | 20 m |

bar
| Component | Value (m) | Length (mm) | | :--- | :--- | :--- | | 4-6 AWG | 10 | 10 | | L | 10 | 10 | | N | 10 | 10 | | PE | 10 | 10 | Grid AC cable

3.1 Wiring instructions
3.1.1 Connecting SYN 100-XH-30 to the Grid
- Remove the two screws on the upper cover of the SYN 100-XH-30 to open the upper cover, and do not remove the cover inside the machine.
- Twist the plastic cover printed with "Grid" counterclockwise, remove the five waterproof plugs, and reserve five holes.
- Route the five power grid cables (L1/L2/L3/N/PE) through the five holes and connect them to the power grid input terminals and the ground copper bar. Screw torques for tightening the power grid terminals and ground terminals are shown in the following table.
- Finally, fasten the plastic cover clockwise. The wiring method is shown in Figure 3.
| Screw torque | |
| Power grid terminals | 26.5 to 31 in*lbs |
| Ground terminal | 13 in*lbs |
Note: PE cables need to be crimped with the O-type terminal in the accessory bag, as shown in Figure 2.
1

natural_image
Exterior view of a white GROWATT industrial device with three ports (no visible text or symbols beyond branding)2

3

3.1.2.1 AC power cable connection:
- Twist the plastic cover printed with "Inverter" counterclockwise; remove the five waterproof plugs, and reserve five holes.
- Route the five cables of the inverter (L1/L2/L3/N/PE) through the five holes, connect the cables to the inverter breaker terminals (L1/L2/L3/N) and the ground copper bar. Screw torques for tightening the inverter breaker terminals and ground terminals are shown in the following table.
- Finally, fasten the plastic cover clockwise. The wiring method is shown below:

Connecting the AC cables to the XH Inverter
| Screw torque | |
| Inverter circuit breaker terminals | 17.5 in*lbs |
| Ground terminal | 13 in*lbs |
3.1.2.2 Communication cable connection:
- Twist the plastic cover printed with "COM" on the machine counterclockwise; remove the waterproof plug, and reserve the hole.
- Route the two communication cables (A/B) (the twisted pair cables are recommended) and the two BOX EN cables (EN+/EN-) through the hole, connect them to the CN8 terminals on the control board. Connect the other end of the cables to the COM terminals of the inverter, and tighten the screws. The following table lists the corresponding terminal pins. The wiring method is shown as follows:

Connecting the communication cables to the XH Inverter
| COM Port | XH Inverter COM | SYN 100-XH-30 COM | Control Board |
| RS485 A | PIN 23 | PIN 3 | CN8 |
| RS485 B | PIN 24 | PIN 4 | |
| BOX.EN+ | PIN 21 | PIN 5 | |
| BOX.EN- | PIN 22 | PIN 6 |
3.1.3 Connecting SYN 100-XH-30 to the load
- Twist the plastic cover printed with "Load" counterclockwise, remove the five waterproof plugs, and reserve five holes.
- Route the five load cables (L1/L2/L3/N/PE) through the five holes, connect them to the load circuit breaker terminals (L1/L2/L3/N) and the ground copper bar. Screw torques for tightening the load breaker terminals and ground terminals are shown in the following table.
- Finally, fasten the plastic cover clockwise. The wiring method is shown to the right:
| Screw torque | |
| Load breaker terminal | 17.5 in*lbs |
| Ground terminal | 13 in*lbs |

Connecting to the AC Loads
4. Indicator description
| System state | Indicator status | |
| Green | Red | |
| On-grid Mode | On | Off |
| Back-up Mode | Blinking (On for 1s, and then Off for 1s) | Off |
| No communication with the inverter | Off | Blinking (on for 1s, and then Off for 1s) |
| System fault | Off | On |
| Firmware upgrade | When the upgrade starts, the yellow light is on or off for 10-20s, and then the yellow light blinks at intervals of 2s (On for 1s and then Off for 1s). | |
5. System startup and shutdown operations
5.1 To start the system, please perform the following steps:
- If the inverter is connected to a battery, turn the DC SWITCH on the battery to ON.
- Set the DC SWITCH on the left side of the inverter to ON.
- Turn on the inverter input breaker of the SYN 100-XH-30.
- Enable the Backup Box function via inverter settings. For details, please refer to the XH inverter manual.
- Turn on the grid breaker
- If the SYN 100-XH-30 indicator light turns green after completing the preceding steps, it indicates that the SYN 100-XH-30 is functioning properly.
- If you cannot power on the system with the instructions provided above, please contact Growatt.
5.2 To shut down the system, please perform the following steps:
- Disconnect the Inverter input breaker and the load input breaker on the SYN 100-XH-30 and then disconnect the power grid breaker.
- Turn off the DC switch of the inverter.
- Turn off the DC switch of the battery.
- Wait for a while and all the indicators of the inverter, the battery, and the SYN 100-XH-30 will go off, indicating that the system is powered off completely.
6. Transfer to the bypass mode manually
When the SYN 100-XH-30 fails, it cannot transfer to the bypass mode automatically. To ensure uninterrupted power supply to loads, it can be switched to the bypass mode manually.
To manually transfer to the bypass mode, please proceed as follows:
- Shut down the entire system. For details, please refer to Section 5.2.
- Use a Phillips screwdriver to loosen the limit switch screw on the power bypass switch.
- Slide the firmware to one end of the inverter switch.
-
Power on the entire system. For details, please refer to section 5.1.
-
Tighten the screw on the limit switch with a torque of 10.5 in* lbs / 1.2 N*m. Turn on the power bypass switch. The operation instructions are shown below.

7. Service and contact
Shenzhen Growatt New Energy Co., Ltd.
4-13/F, Building A, Sino-German (Europe) Industrial Park,
Hangcheng Ave, Bao'an District, Shenzhen, China
T +86 755 2747 1942
E service@ginverter.com
W www.ginverter.com

Download Manual


Growatt New Energy