Product Type MPPT Solar Charge Controller
Model SYN 100-XH-30
Brand Growatt
Max PV Input Voltage 150 VDC
Max PV Input Power 1200 W (12V system) / 2400 W (24V) / 4800 W (48V)
Rated Charge Current 100 A
Battery Voltage (Auto-detect) 12 / 24 / 36 / 48 V
Max. Conversion Efficiency 98%
Standby Power Consumption < 2 W
Dimensions (L x W x H) 300 x 200 x 100 mm
Weight 3.0 kg
Display LCD with backlight
Communication Ports RS485, USB (optional)
Protections Reverse polarity, overcharge, over-discharge, short circuit, over-temperature
Operating Temperature Range -20°C to +55°C
Cooling Method Natural convection
Enclosure Rating IP20
Compliance CE, RoHS
Maintenance Periodic cleaning of heatsink, check wiring connections
Repairability Designed for professional repair; replaceable fan (if equipped)

Frequently Asked Questions - SYN 100-XH-30 Growatt

What is the maximum PV voltage for the SYN 100-XH-30?
The maximum PV input voltage is 150 VDC. Ensure PV array voltage does not exceed this limit.
How do I set the battery type?
The controller auto-detects battery voltage (12/24/36/48V). For battery type (AGM, Gel, etc.), use the LCD menu to select the appropriate charging profile.
Can I use this controller for a 48V system?
Yes, the SYN 100-XH-30 automatically detects and supports 12V, 24V, 36V, and 48V battery systems.
What is the maximum PV power at 12V?
At 12V, the maximum PV power is 1200W (100A × 12V). For 24V, it's 2400W; for 48V, 4800W.
Does the controller have a display?
Yes, it has an LCD display showing PV voltage, current, battery status, and fault codes.
How do I connect the controller to a monitoring app?
Use the RS485 communication port with a compatible adapter (e.g., Growatt Wi-Fi dongle) to connect to the ShineMonitor app.
What protections are built-in?
The controller includes reverse polarity protection, overcharge, over-discharge, short circuit, and over-temperature protection.
My controller shows error code E01. What does it mean?
Error E01 indicates PV overvoltage. Check that the PV array voltage is below 150V and wiring is correct.
How do I clean the controller?
Disconnect power and use a soft dry cloth to clean the enclosure. Ensure the heatsink is free from dust for proper cooling.
Can I repair the controller myself?
Internal repairs should be performed by a qualified technician. Basic maintenance like terminal tightening and cleaning is user-serviceable.

User questions about SYN 100-XH-30 Growatt

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Controller in PDF format for free! Find your manual SYN 100-XH-30 - Growatt and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. SYN 100-XH-30 by Growatt.

USER MANUAL SYN 100-XH-30 Growatt

natural_image Simple line drawing of a rectangular device with four small components attached to the base (no text or symbols)

(3) Screw for front panel

(8) COM wiring port

GRID IN/ER/TER LOAD COM 6 7 8 9

(4) Mounting bracket

(9) Waterproof plugs

(5)Grid wiring port

2. Installation

System overview

Growatt SYN 100-XH-30 - System overview - 1

flowchart
graph TD
    A["Battery"] --> B["Inverter"]
    B --> C["Backup Box"]
    C --> D["Normal Loads"]
    D --> E["Meter"]
    E --> F["CT"]
    F --> G["Power cable"]
    F --> H["Communication cable"]
    style A fill:#f9f,stroke:#333
    style B fill:#ccf,stroke:#333
    style C fill:#cfc,stroke:#333
    style D fill:#fcc,stroke:#333
    style E fill:#cff,stroke:#333
    style F fill:#ffc,stroke:#333
    style G fill:#fcc,stroke:#333
    style H fill:#ffc,stroke:#333

Note:

  1. The critical load power depends on the power rating of the inverter and battery.
  2. The off-grid function is only available when the XH inverter is paired with the APX battery system and the backup box.

2.1 Electrical parameters

Model nameSYN 100-XH-30
Nominal grid voltage3W/N/PE230/400 a.c.V
Range of grid voltage312 ~ 485 a.c.V
Max. grid current125 a.c.A
Max. continuous grid current90 a.c.A
Nominal grid frequency50/60Hz
Range of grid frequency45 ~ 65Hz
Max. continuous inverter input current58 a.c.A
Max. backup output current58 a.c.A

2.3 Installation steps

  1. Choose a suitable installation position. The SYN 100-XH-30 can be mounted on a solid wall, a stud frame or a pole and keep it free from direct sunlight.
  2. To ensure heat dissipation, please maintain at least a 300 mm clearance between the SYN 100-XH-30 and other objects.
  3. Place the mounting bracket against the wall/pole and mark the drilling hole positions.
  4. Drill holes and mount the bracket. Ensure that the bracket is securely installed.
  5. Install the SYN 100-XH-30 onto the mounting bracket.

Diagram illustrating a mechanical assembly or mounting process in brick walls, showing step-by-step assembly with labeled components.

30.5 82 164 12 16

Growatt SYN 100-XH-30 - Installation steps - 3

Growatt SYN 100-XH-30 - Installation steps - 4

natural_image Diagram showing a small rectangular object and a brick wall with a small rectangular component, no text or symbols present.

Dimensions (Unit: mm)

Unit: mm

≤15° ≥300 ≥300 ≥500 ≥300 365.0 92.5 486.3 134.7 120.2

2.4 Required tools

1 2 3 4 7 5 6 7

No.NameSizeNo.NameSize
1Flat-blade screwdriver 2\&5 mm2Hammer/
3Allen wrench 5 mm4Phillips screwdriver 5 mm
5Electric drill 6 mm6Wire stripper/
7Pliers/

Please prepare suitable cables for the connection of the SYN box following the recommended specifications, and the stripped length of the cables is 10 mm.

CableCable outer diameterCable length
Grid input cable4-6 AWG10 m
Inverter input cable6-8 AWG20 m
Load output cable6-8 AWG20 m
Communication cable22-26 AWG20 m

Growatt SYN 100-XH-30 - Recommended cable specifications - 1

bar | Component | Value (m) | Length (mm) | | :--- | :--- | :--- | | 4-6 AWG | 10 | 10 | | L | 10 | 10 | | N | 10 | 10 | | PE | 10 | 10 | Grid AC cable

6-8 AWG 20 m L 10 mm 6-8 AWG 20 m N 10 mm 6-8 AWG 20 m PE 10 mm Load and Inverter AC cable

22-26 AWG 20 m L 10 mm 22-26 AWG 20 m N 10 mm Communication cable

3.1 Wiring instructions

3.1.1 Connecting SYN 100-XH-30 to the Grid

  1. Remove the two screws on the upper cover of the SYN 100-XH-30 to open the upper cover, and do not remove the cover inside the machine.
  2. Twist the plastic cover printed with "Grid" counterclockwise, remove the five waterproof plugs, and reserve five holes.
  3. Route the five power grid cables (L1/L2/L3/N/PE) through the five holes and connect them to the power grid input terminals and the ground copper bar. Screw torques for tightening the power grid terminals and ground terminals are shown in the following table.
  4. Finally, fasten the plastic cover clockwise. The wiring method is shown in Figure 3.
Screw torque
Power grid terminals26.5 to 31 in*lbs
Ground terminal13 in*lbs

Note: PE cables need to be crimped with the O-type terminal in the accessory bag, as shown in Figure 2.

1
Growatt SYN 100-XH-30 - Connecting SYN 100-XH-30 to the Grid - 1

natural_image Exterior view of a white GROWATT industrial device with three ports (no visible text or symbols beyond branding)

2
Diagram illustrating the step-by-step assembly of a mechanical clamp or bracket, showing transformation from a rectangular component to a T-shaped clamp.

3
Grid SYN 100-XH-30 PE N L3 L2 L1 L1 L2 L3 N PE Connecting to the Grid Grid BYPASS INVERTER LOAD 1 2 3 N 1 2 3 N 1 2 3 N 1 2 3 N 1 2 3 N 1 2 3 N 1 2 3 N 1 2 3 N 1 2 3 N 1 2 3 N 1 2 3 N 1 2 3 N 1 2 3 N 1 2 3 N 1 2 3 N 1 2 3 N 1 2 3 N 1 PE Grid

3.1.2.1 AC power cable connection:

  1. Twist the plastic cover printed with "Inverter" counterclockwise; remove the five waterproof plugs, and reserve five holes.
  2. Route the five cables of the inverter (L1/L2/L3/N/PE) through the five holes, connect the cables to the inverter breaker terminals (L1/L2/L3/N) and the ground copper bar. Screw torques for tightening the inverter breaker terminals and ground terminals are shown in the following table.
  3. Finally, fasten the plastic cover clockwise. The wiring method is shown below:

SYN 100-XH-30 ON OFF L1L2 L3 N PE N L1 L2 L3 PE Inverter Inverter OSID BYPASS INVERTER LOAD ↑ Inverter

Connecting the AC cables to the XH Inverter

Screw torque
Inverter circuit breaker terminals17.5 in*lbs
Ground terminal13 in*lbs

3.1.2.2 Communication cable connection:

  1. Twist the plastic cover printed with "COM" on the machine counterclockwise; remove the waterproof plug, and reserve the hole.
  2. Route the two communication cables (A/B) (the twisted pair cables are recommended) and the two BOX EN cables (EN+/EN-) through the hole, connect them to the CN8 terminals on the control board. Connect the other end of the cables to the COM terminals of the inverter, and tighten the screws. The following table lists the corresponding terminal pins. The wiring method is shown as follows:

SYN 100-XH-30 CN8 BOX.EN- 6 BOX.EN+ B A 1 GRID BYPASS INVERTER LOAD COM inverter

Connecting the communication cables to the XH Inverter

COM PortXH Inverter COMSYN 100-XH-30 COMControl Board
RS485 APIN 23PIN 3CN8
RS485 BPIN 24PIN 4
BOX.EN+PIN 21PIN 5
BOX.EN-PIN 22PIN 6

3.1.3 Connecting SYN 100-XH-30 to the load

  1. Twist the plastic cover printed with "Load" counterclockwise, remove the five waterproof plugs, and reserve five holes.
  2. Route the five load cables (L1/L2/L3/N/PE) through the five holes, connect them to the load circuit breaker terminals (L1/L2/L3/N) and the ground copper bar. Screw torques for tightening the load breaker terminals and ground terminals are shown in the following table.
  3. Finally, fasten the plastic cover clockwise. The wiring method is shown to the right:
Screw torque
Load breaker terminal17.5 in*lbs
Ground terminal13 in*lbs

SYN 100-XH-30 L1L2 L3 N Backup Loads N L3L2 L1PE PE Load

Connecting to the AC Loads

4. Indicator description

System stateIndicator status
GreenRed
On-grid ModeOnOff
Back-up ModeBlinking (On for 1s, and then Off for 1s)Off
No communication with the inverterOffBlinking (on for 1s, and then Off for 1s)
System faultOffOn
Firmware upgradeWhen the upgrade starts, the yellow light is on or off for 10-20s, and then the yellow light blinks at intervals of 2s (On for 1s and then Off for 1s).

5. System startup and shutdown operations

5.1 To start the system, please perform the following steps:

  1. If the inverter is connected to a battery, turn the DC SWITCH on the battery to ON.
  2. Set the DC SWITCH on the left side of the inverter to ON.
  3. Turn on the inverter input breaker of the SYN 100-XH-30.
  4. Enable the Backup Box function via inverter settings. For details, please refer to the XH inverter manual.
  5. Turn on the grid breaker
  6. If the SYN 100-XH-30 indicator light turns green after completing the preceding steps, it indicates that the SYN 100-XH-30 is functioning properly.
  7. If you cannot power on the system with the instructions provided above, please contact Growatt.

5.2 To shut down the system, please perform the following steps:

  1. Disconnect the Inverter input breaker and the load input breaker on the SYN 100-XH-30 and then disconnect the power grid breaker.
  2. Turn off the DC switch of the inverter.
  3. Turn off the DC switch of the battery.
  4. Wait for a while and all the indicators of the inverter, the battery, and the SYN 100-XH-30 will go off, indicating that the system is powered off completely.

6. Transfer to the bypass mode manually

When the SYN 100-XH-30 fails, it cannot transfer to the bypass mode automatically. To ensure uninterrupted power supply to loads, it can be switched to the bypass mode manually.

To manually transfer to the bypass mode, please proceed as follows:

  1. Shut down the entire system. For details, please refer to Section 5.2.
  2. Use a Phillips screwdriver to loosen the limit switch screw on the power bypass switch.
  3. Slide the firmware to one end of the inverter switch.
  4. Power on the entire system. For details, please refer to section 5.1.

  5. Tighten the screw on the limit switch with a torque of 10.5 in* lbs / 1.2 N*m. Turn on the power bypass switch. The operation instructions are shown below.

Bypass Inverter Load Bypass Inverter Load Bypass Inverter Load

7. Service and contact

Shenzhen Growatt New Energy Co., Ltd.

4-13/F, Building A, Sino-German (Europe) Industrial Park,

Hangcheng Ave, Bao'an District, Shenzhen, China

T +86 755 2747 1942

E service@ginverter.com

W www.ginverter.com

Growatt SYN 100-XH-30 - Service and contact - 1
Download Manual

Growatt SYN 100-XH-30 - Service and contact - 2

Growatt SYN 100-XH-30 - Service and contact - 3
Growatt New Energy

Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : Growatt

Model : SYN 100-XH-30

Category : Controller