Hanwha SNV-8081R - Security Camera

SNV-8081R - Security Camera Hanwha - Free user manual and instructions

Find the device manual for free SNV-8081R Hanwha in PDF.

📄 166 pages English EN Download 💬 AI Question 10 questions ⚙️ Specs
Notice Hanwha SNV-8081R - page 2
Pick your language and provide your email: we'll send you a specifically translated version.
Product Type Network Security Camera
Model SNV-8081R
Sensor 5 Megapixel CMOS
Video Codec H.264, H.265, MJPEG
Maximum Resolution Up to 5MP (2560x1920) at 15fps; 2MP (1920x1080) at 30fps
Day/Night Yes, with IR cut filter (automatic switching)
IR Illumination 30m effective range at 0 Lux (B/W mode)
Ingress Protection IP66 (dustproof and waterproof)
Power Supply 24 VAC (50/60 Hz), 1.0 A or 12 VDC, 1.0 A or PoE (IEEE 802.3af)
Audio Input Line in / External microphone (3.5mm jack), with optional plug-in power
Audio Output Line out (3.5mm jack)
Alarm I/O 1 alarm input, 1 alarm output
Storage Micro SD/SDHC/SDXC slot (4GB-128GB), NAS support
Network Interface RJ45 10/100Base-T
ONVIF Compliance Profile S
Smart Features Motion detection, tampering detection, audio detection, smart codec, ATC
Multi-Streaming Yes, simultaneous streams with different codecs and resolutions
Web Viewer Compatibility Internet Explorer 8-11, Firefox 9-35, Chrome 15-40, Safari (Mac OS X)
Cleaning Use soft dry cloth or damp cloth; do not use alcohol, solvents, or detergents
Installation Ceiling or wall mount; includes template and mounting hardware
Included Accessories L wrench, test monitor cable, RJ45 waterproof accessory, sunshield, power cable, audio/alarm cable, cable bush, screws, plastic anchors, drill bit, moisture absorbent
Safety Complies with FCC Class A; read safety instructions before use; no user-serviceable parts inside

Frequently Asked Questions - SNV-8081R Hanwha

How do I reset the camera to factory default settings?
Press and hold the Reset button for about 5 seconds. The camera will reboot and restore all settings to factory defaults, including network settings which will enable DHCP.
What type of memory card is recommended for this camera?
We recommend using Micro SD/SDHC/SDXC cards from Sandisk or Transcend, with capacities from 4GB to 128GB. For framerates below 30 fps, use Class 6 or higher; for over 31 fps, use Class 10 UHS or higher.
How can I connect the camera to my network?
Connect an Ethernet cable to the camera's Network port and to your router/switch. Use the IP Installer software on a local PC to assign an IP address. The camera defaults to DHCP; if no DHCP server is found, it uses 192.168.1.100.
How do I access the camera remotely over the internet?
Configure DDNS in the camera's network settings (Setup > Network > DDNS) and set up port forwarding on your router for HTTP, RTSP, and device ports. Then access via the DDNS URL (e.g., http://www.samsungipolis.com/ProductID).
What is the default password for the admin account?
The initial password for the admin account (ID: admin) is 4321. You will be prompted to change it upon first login. For security, use a combination of uppercase, lowercase, numbers, and special characters.
How should I clean the camera?
Clean the surface with a soft, dry cloth or a damp cloth. Do not use alcohol, solvents, detergents, or cosmetics containing oil as they may damage the product.
Can I use Power over Ethernet (PoE) with this camera?
Yes, the camera supports IEEE 802.3af PoE. You can supply power through the Ethernet cable using a PoE-compatible switch or injector.
How do I install the camera outdoors?
Use the included RJ45 waterproof accessory for the Ethernet connection. Also, wrap the power/I/O cable connections with waterproof butyl rubber tape (available separately) to prevent water ingress.
What video codecs are supported?
The camera supports H.264, H.265, and MJPEG codecs. You can configure multiple profiles with different codecs and resolutions for streaming and recording.
How can I adjust the camera's viewing direction?
Use the provided L wrench to adjust pan (354°), tilt (67°), and rotation (355°). Loosen the bracket screw, adjust the camera, then tighten the screw to secure it.

User questions about SNV-8081R Hanwha

0 question about this device. Answer the ones you know or ask your own.

Ask a new question about this device

The email remains private: it is only used to notify you if someone responds to your question.

No questions yet. Be the first to ask one.

Download the instructions for your Security Camera in PDF format for free! Find your manual SNV-8081R - Hanwha and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. SNV-8081R by Hanwha.

USER MANUAL SNV-8081R Hanwha

©2016Hanwha TechwinCo., Ltd. All rights reserved.

Trademark

Each of trademarks herein is registered. The name of this product and other trademarks mentioned in this manual are the registered trademark of their respective company.

Restriction

Copyright of this document is reserved. Under no circumstances, this document shall be reproduced, distributed or changed, partially or wholly, without formal authorization.

Disclaimer

Hanwha Techwin makes the best to verify the integrity and correctness of the contents in this document, but no formal guarantee shall be provided. Use of this document and the subsequent results shall be entirely on the user's own responsibility. Hanwha Techwin reserves the right to change the contents of this document without prior notice.

- Design and specifications are subject to change without prior notice.

The initial administrator ID is "admin" and the password should be set when logging in for the first time.

Please change your password every three months to safely protect personal information and to prevent the damage of the information theft.

Please, take note that it's a user's responsibility for the security and any other problems caused by mismanaging a password.

important Safety inStructionS

  1. Read these instructions.
  2. Keep these instructions.
  3. Heed all warnings.
  4. Follow all instructions.
  5. Do not use this apparatus near water.
  6. Clean the contaminated area on the product surface with a soft, dry cloth or a damp cloth.

(Do not use a detergent or cosmetic products that contain alcohol, solvents or surfactants or oil constituents as they may deform or cause damage to the product.)

  1. Do not block any ventilation openings, Install in accordance with the manufacturer's instructions.

  2. Do not install near any heat sources such as radiators, heat registers, stoves, or other apparatus (including amplifiers) that produce heat.

  3. Do not defeat the safety purpose of the polarized or grounding-type plug. A polarized plug has two blades with one wider than the other. A grounding type plug has two blades and a third grounding prong. The wide blade or the third prong are provided for your safety. If the provided plug does not fit into your outlet, consult an electrician for replacement of the obsolete outlet.

  4. Protect the power cord from being walked on or pinched particularly at plugs, convenience receptacles, and the point where they exit from the apparatus.

  5. Only use attachments/ accessories specified by the manufacturer.

  6. Use only with the cart, stand, tripod, bracket, or table specified by the manufacturer, or sold with the apparatus. When a cart is used, use caution when moving the cart/apparatus combination to avoid injury from tip-over.

  7. Unplug this apparatus during lighting storms or when unused for long periods of time.

  8. Refer all servicing to qualified service personnel. Servicing is required when the apparatus has been damaged in any way, such as power-supply cord or plug is damaged, liquid has been spilled or objects have fallen into the apparatus, the apparatus has been exposed to rain or moisture, does not operate normally, or has been dropped.

  9. This product is intended to be supplied by a Listed Power Supply Unit marked "Class 2" or "LPS" and rated from 24 Vac (50/60 Hz) 1.0 A or 12 Vdc, 1.0 A.

Hanwha SNV-8081R - important Safety inStructionS - 1

natural_image Symbolic icon of a person pushing a large object, enclosed in a circle (no text or symbols)

warningG

TO REDUCE THE RISK OF FIRE OR ELECTRIC SHOCK, DO NOT EXPOSE THIS PRODUCT TO RAIN OR MOISTURE. DO NOT INSERT ANY METALLIC OBJECT THROUGH THE VENTILATION GRILLS OR OTHER OPENINGS ON THE EQUIPMENT.

Apparatus shall not be exposed to dripping or splashing and that no objects filled with liquids, such as vases, shall be placed on the apparatus.

To prevent injury, this apparatus must be securely attached to the Wall/ceiling in accordance with the installation instructions.

caution

Hanwha SNV-8081R - caution - 1

caution

riSK of eElectric SHocK. Do not open

Hanwha SNV-8081R - caution - 1

CAUTION: TO REDUCE THE RISK OF ELECTRIC SHOCK. DO NOT REMOVE COVER (OR BACK). NO USER SERVICEABLE PARTS INSIDE. REFER SERVICING TO QUALIFIED SERVICE PERSONNEL.

eXpLanation of GrapHicaL SymBoLS

Hanwha SNV-8081R - eXpLanation of GrapHicaL SymBoLS - 1

The lightning flash with arrowhead symbol, within an equilateral triangle, is intended to alert the user to the presence of “dangerous voltage” within the product’s enclosure that may be of sufficient magnitude to constitute a risk of electric shock to persons.

Hanwha SNV-8081R - eXpLanation of GrapHicaL SymBoLS - 2

The exclamation point within an equilateral triangle is intended to alert the user to the presence of important operating and maintenance (servicing) instructions in the literature accompanying the product.

Class I construction

An apparatus with CLASS I construction shall be connected to a MAINS socket outlet with a protective earthing connection.

Battery

Batteries(battery pack or batteries installed) shall not be exposed to excessive heat such as sunshine, fire or the like.

Disconnection Device

Disconnect the main plug from the apparatus, if it's defected. And please call a repair man in your location.

When used outside of the U.S., it may be used HAR code with fittings of an approved agency is employed.

CAUTION

Risk of explosion if battery is replaced by an incorrect type. Dispose of used batteries according to the instructions.

These servicing instructions are for use by qualified service personnel only. To reduce the risk of electric shock do not perform any servicing other than that contained in the operating instructions unless you are qualified to do so.

The CVBS out terminal of the product is provided for easier installation, and is not recommended for monitoring purposes.

Please use the input power with just one camera and other devices must not be connected.

The ITE is to be connected only to PoE networks without routing to the outside plant.

Please read the following recommended safety precautions carefully.

  • Do not place this apparatus on an uneven surface.
  • Do not install on a surface where it is exposed to direct sunlight, near heating equipment or heavy cold area.
  • Do not place this apparatus near conductive material.
  • Do not attempt to service this apparatus yourself.
  • Do not place a glass of water on the product.
  • Do not install near any magnetic sources.
  • Do not block any ventilation openings.
  • Do not place heavy items on the product.

User's Manual is a guidance book for how to use the products.

The meaning of the symbols are shown below.

  • Reference : In case of providing information for helping of product's usages
  • Notice : If there's any possibility to occur any damages for the goods and human caused by not following the instruction

※ Please read this manual for the safety before using of goods and keep it in the safe place.

OVERVIEW

3

3 Important Safety Instructions

9 Product Features

10 Recommended PC Specifications

11 Recommended Micro SD/SDHC/SDXC Memory Card Specifications

11 NAS recommended specs

12 What's Included

15 At a Glance (SNO-8081R)

18 At a Glance (SNV-8081R)

INSTALLATION & CONNECTION

21

21 Installation (SNO-8081R)

25 Installation (SNV-8081R)

33 Inserting/Removing a Micro SD Memory Card

36 Memory Card Information (Not Included)

37 Connecting with other Device

NETWORK CONNECTION AND SETUP

44

44 Connecting the Camera Directly to Local Area Networking

45 Connecting the Camera Directly to a DHCP Based DSL/Cable Modem

46 Connecting the Camera Directly to a PPPoE Modem

47 Connecting the Camera to a Broadband Router with the PPPoE/Cable Modem

48 Buttons used in IP Installer

49 Static IP Setup

53 Dynamic IP Setup

54 Port Range Forward (Port Mapping) Setup

56 Connecting to the Camera from a Shared Local PC

56 Connecting to the Camera from a Remote PC via the Internet

WEB VIEWER

57

57 Connecting to the Camera

59 Password setting

59 Login

60 Installing WebViewer Plugin

62 Using the Live Screen

66 Playing the recorded video

SETUP SCREEN

73

73 Setup

73 Basic Setup

83 Video & Audio setup

95 Network Setup

104 Event Setup

110 NAS (Network Attached Storage) guide

124 System Setup

130 Viewing profile information

APPENDIX

131

131 Specification

137 Product Overview

139 Troubleshooting

141 Open Source Announcement

• Dustproof/Waterproof (IP66)

The dustproof and waterproof design makes you feel at ease when installing the product outdoors or exposing it to rain.

- IR mode

If the IR indicator turns on, the product switches to the IR mode for preventing an object from being too bright, which helps you identify the object in near distance.

- Visibility: 30m

In B/W mode, the IR indicator turns on with the effective visibility of 30m at 0 Lux.

• Full HD Video Quality

- Multi-Streaming

This network camera can display videos in different resolutions and qualities simultaneously using different CODECs.

• Web Browser-based Monitoring

Using the Internet web browser to display the image in a local network environment.

- Alarm

When an event occurs, video is either sent to the email address registered by the user, sent to the FTP server, saved in a Micro SD card or NAS, or a signal is sent to the alert output terminal.

- Tampering Detection

Detects tampering attempts on video monitoring.

- Motion Detection

Detects motion from the camera's video input.

- Audio Detection

Detects sound louder than a certain level specified by user.

- Smart Codec

Adaptively applies codecs for a portion of the camera's field of view to improve the quality of such area specified by user.

• Auto Detection of Disconnected Network

Detects network disconnection before triggering an event.

- ONVIF Compliance

This product supports ONVIF Profile-S.

For more information, refer to www.onvif.org.

Hanwha SNV-8081R - - ONVIF Compliance - 1

NVIF

Driving network video through global standardization

- CPU : Intel Core i5 compatible or higher Intel Core i7 2.8 GHz or higher (when H.265 codec is used)

■ Web Plug-in is optimized to SSE 4.1 Instruction Set.

• Resolution : 1280X1024 pixels or higher (32 bit color)

■ If Mode is changed, the system is rebooted.

• Maximum resolution : 5M Mode + LDC ON : 15fps 2M Mode + LDC ON : 30fps

5M Mode + LDC ON + Hallway ON : 10fps

2M Mode + LDC ON + Hallway ON : 30fps

• RAM : 2GB or higher

- Supported OS : Windows XP / VISTA / 7 / 8 / 8.1, MAC OS X 10.7 \~ 10.10

• Supported Browser : Microsoft Internet Explorer (Ver. 8 \~ 11),

Mozilla Firefox (Ver. 9 \~ 35), Google Chrome (Ver. 15 \~ 40),

Apple Safari (Ver. 8.0.2(Mac OS X 10.10), 7.0.6(Mac OS X 10.9), 6.0.2 (Mac OS X 10.8, 10.7 only), 5.1.7) ※ Mac OS X only

■ Windows 8 is supported only in the Desktop mode.

■ Neither a beta test version unlike the version released in the company website nor the developer version will be supported.

■ For IPv6 connection, Window 7 or higher is recommended.

■ For Mac OS X, only the Safari browser is supported.

For all browsers, it is limited to a version that supports the web plug-in (Active X or NPAPI) function.

• VGA : PCIe 256MB GDDR3 video graphics card or higher

Hanwha SNV-8081R - recommenDeD pc SpecificationS - 1

If the driver of the video graphic adapter is not installed properly or is not the latest version, the video may not be played properly.

- For a multi-monitoring system involving at least 2 monitors, the playback performance can be deteriorated depending on the system.

• Recommended capacity : 4GB \~ 128GB
- For your camera, we recommend you use a memory card from the following manufacturers: Micro SD/SDHC/SDXC Memory Card : Sandisk, Transcend
- For the framerate below 30 fps, it is recommended to use the specification memory card of Class 6 or higher.
- For the framerate over 31 fps, it is recommended to use the specification memory card of Class 10 UHS or higher.

  • Recommended capacity : 200GB or higher is recommended.
  • Simultaneous access : One unit of NAS can accept a maximum of sixteen camera accesses.
  • For this camera, you are recommended to use a NAS with the following manufacturer's specs.
Recommended products Available sizes
Netgear NAS A maximum of 16 cameras can access simultaneously.
Synology NAS A maximum of 16 cameras can access simultaneously.

Hanwha SNV-8081R - naS recommenDeD SpecS - 1

  • When you use Netgear's NAS equipment, do not allocate the capacity for use.
    If you use NAS equipment for purposes other than video saving, the number of accessible cameras may be reduced.

wHat'S incLuDeD

Please check if your camera and accessories are all included in the product package.

(As for each sales country, accessories are not the same.)

Appearance Item NameQuantityDescription Model Name
Hanwha SNV-8081R - wHat'S incLuDeD - 1Camera1SNO-8081R or SNV-8081R
Hanwha SNV-8081R - wHat'S incLuDeD - 21
Hanwha SNV-8081R - wHat'S incLuDeD - 3Instruction book, Installer S/W CD1SNO-8081R/ SNV-8081R
Hanwha SNV-8081R - wHat'S incLuDeD - 4Quick Guide (Optional)1SNO-8081R/ SNV-8081R
Hanwha SNV-8081R - wHat'S incLuDeD - 5Warranty card (Optional)1SNO-8081R/ SNV-8081R
Hanwha SNV-8081R - wHat'S incLuDeD - 6L Wrench1Used to control the direction of the camera / Used to remove and replace the dome coverSNO-8081R/ SNV-8081R
Hanwha SNV-8081R - wHat'S incLuDeD - 7Cable for the testing monitor1Used to test the camera connection to a portable display deviceSNO-8081R/ SNV-8081R
Hanwha SNV-8081R - wHat'S incLuDeD - 8RJ45 waterproof accessory1Used to install in humid placesSNO-8081R
Hanwha SNV-8081R - wHat'S incLuDeD - 9Tapping Screw 4Used for installation on the wall or ceilingSNO-8081R
Hanwha SNV-8081R - wHat'S incLuDeD - 10Sunshield 1It protects the camera from the direct sunlight.SNO-8081R
Hanwha SNV-8081R - wHat'S incLuDeD - 11Sunshield Hold 1It fixes the sunshield with the camera.SNO-8081R
Hanwha SNV-8081R - wHat'S incLuDeD - 12Power Terminal Block 1Plugged in the power plug SNV-8081R
Hanwha SNV-8081R - wHat'S incLuDeD - 13Power Cable1Used to plug into the power portSNV-8081R
Hanwha SNV-8081R - wHat'S incLuDeD - 14Template1Product installation guideSNV-8081R
Hanwha SNV-8081R - wHat'S incLuDeD - 15Audio/alarm cable1Used to connect with the audio and alarm portSNV-8081R
Hanwha SNV-8081R - wHat'S incLuDeD - 16Cable bush 1Used to connect the LAN cable with a diameter of ∅7~8.5.SNV-8081R
Hanwha SNV-8081R - wHat'S incLuDeD - 17Tapping Screw3Used for installation on the wall or ceilingSNV-8081R
Appearance Item NameQuantityDescription Model Name
Hanwha SNV-8081R - wHat'S incLuDeD - 18Plastic Anchor3For fixing a screw, Inserted in a hole (reinforced anchoring force)
Hanwha SNV-8081R - wHat'S incLuDeD - 19Machine Screws 3Used for assembling the dome case when installing the product on the pipe, wall mount, etc. or blocking a hole.
Hanwha SNV-8081R - wHat'S incLuDeD - 20Drill bit 1Used for dome cover disassembly, assembly and camera installation.
Hanwha SNV-8081R - wHat'S incLuDeD - 21Card-type moisture absorbent1Attached when installed.
Options (not included)
Hanwha SNV-8081R - wHat'S incLuDeD - 22Indoor Buried HousingHousing for installing indoor buried type cameras

Appearance
Technical diagram of a security camera with labeled components including an internal card and control panel

Item Description
1 Micro SD card slot(Internal space of the product) This is a slot in which you can insert a Micro SD card.
2 Sunshield Hold It fixesthe sunshield with the camera.
3 Sunshield It protects the camera from the direct sunlight.
4 Reset ButtonThe button restores all camera settings to the factory default.Press and hold for about 5 seconds to reboot the system.⚠ If you reset the camera, the network settings will be adjusted so that DHCP can be enabled. If there is no DHCP server in the network, you must run the IP Installer program to change the basic network settings such as IP address, Subnet mask, Gateway, etc., before you can connect to the network.
Item Description
5 Zoom/Focus Control ButtonT Zoom in (Tele)
W Zoom out (Wide)
N Focusing on a near object (Near)
F Focusing on a far object (Far)
Focus Control Press this button for automatic focus control.
6 Test Monitor OutOutput port for test monitoring the video output. Use the test monitor cable to connect to a mobile display and check the test video.

Hanwha SNV-8081R - wHat'S incLuDeD - 24

- Wipe out a dirty surface of the lens softly with a lens tissue or cloth to which you have applied ethanol.

Components

1 2 3 4 5

Item Description
1 Power Port Used to plug the power cable.
2 Alarm I/O PortARM-OUT Used to connect the alarm output signal.
GNDThese are common ports to connect alarm input/output signals.
ARM-INUsed to connect the alarm input sensor or external day/night sensor.
3 Network Port Used to connect the PoE or Ethernet cable for network connection.
4 Audio Out Jack Used to connect to speakers.
5 Audio In Jack Used to connect to a microphone.

AT A GLANCE (SNV-8081R)

Appearance
Technical diagram of a mechanical component with labeled parts 1 and 2

Item Description
1 Dome coverCase cover used to protect the lens and the main unit.
2 Camera CaseHousing part that covers the camera body.

Components

1 2 3 FRONT NO. 247/DCN PV RIGHT 5 6 7

8 9 10

Item Description
1 Illumination Sensor Detects incoming light to control the IR LED.
2 Lens Lens for the camera.
3 IR LED These infrared LED's are controlled by the illumination sensor.
4 Power Port Port for power terminal block.
5 Test Monitor OutOutput port for test monitoring the video output. Use the test monitor cable to connect to a mobile display and check the test video.
6 Reset ButtonThe button restores all camera settings to the factory default.Press and hold for about 5 seconds to reboot the system.1 If you reset the camera, the network settings will be adjusted so that DHCP can be enabled. If there is no DHCP server in the network, you must run the IP Installer program to change the basic network settings such as IP address, Subnet mask, Gateway, etc., before you can connect to the network.
7 Zoom/Focus Control ButtonT Zoom in (Tele)
W Zoom out (Wide)
N Focusing on a near object (Near)
F Focusing on a far object (Far)
Focus Control Press this button for automatic focus control.
8 Micro SD Memory Card CompartmentCompartment for the Micro SD memory card.
9 Audio and alarm cable portPlug in the audio and alarm cable to this port to connect with external alarm device/microphone/speaker.
10 Network Port Used to connect the PoE or Ethernet cable for network connection.

INSTALLATION (SNO-8081R)

Hanwha SNV-8081R - INSTALLATION (SNO-8081R) - 1

This camera is waterproof and in compliance with the IP66 spec, but the jack connected to the external cable is not. You are recommended to install this product below the edge of eaves to prevent the cable from being externally exposed.

Precautions before installation

Ensure you read out the following instructions before installing the camera:

  • It must be installed on the area (ceiling or wall) that can withstand 5 times the weight of the camera including the installation bracket.
  • Stuck-in or peeled-off cables can cause damage to the product or a fire.
  • For safety purposes, keep anyone else away from the installation site. And put aside personal belongings from the site, just in case.

Installation

  1. Fix the Bottom cover using the 4 tapping screws provided.

TOP

installation & connection

  1. Hang the safety cable up on a hook that looks like an arrow in the Bottom cover.
  2. Connect the appropriate cables with camera terminals.

Hanwha SNV-8081R - installation & connection - 1

natural_image Technical line drawing of a mechanical linkage or cable assembly (no text or symbols)
  1. Tighten the 3 screws on the Top cover using the L wrench provided.
  2. Adjust the camera direction using the L wrench provided.

When you adjust the camera position using a bracket, please loosen the bracket screw, adjust the camera, and tighten it. If you attempt to adjust it forcibly while the screw is tight, it may result in a scratch or other problems.

Hanwha SNV-8081R - installation & connection - 2

natural_image Technical line drawing of a surveillance camera with mounted sensor and ceiling (no text or symbols)

How to connect the RJ45 waterproof cable to a LAN cable

  1. Insert it through the arrow direction.

  2. Connect the LAN connector (male) to the cable.

  3. Connect the RJ45 modular jack (female) to the RJ45 connector (male).

Please, keep each of the parts separated.

  1. Assemble by rotating the RJ45 modular jack (female) and the RJ45 protection cover clockwise (Follow the arrow).

  2. Assemble by rotating RJ45 protection cover and back cover clockwise (Follow the arrow). When the back cover is assembled, the cable waterproof gasket is tightly attached to the cable to make it waterproof.

You must fully assemble it to rotate the back cover up to the end of the screw thread of the RJ45 connector.

Hanwha SNV-8081R - How to connect the RJ45 waterproof cable to a LAN cable - 1

natural_image Diagram of a cylindrical component being inserted into a segmented cylindrical body, showing internal structure and assembly (no text or symbols)

Hanwha SNV-8081R - How to connect the RJ45 waterproof cable to a LAN cable - 2

natural_image Technical illustration of a multi-core cable or connector assembly (no text or symbols visible)

RJ45 connector (male) RJ45 modular jack (female)

RJ45 connector protection cover Back cover Cable waterproof gasket

Hanwha SNV-8081R - How to connect the RJ45 waterproof cable to a LAN cable - 5

natural_image Cross-sectional diagram of a cable or connector assembly (no text or symbols visible)

Outdoor installation

When you install it outside of the building, please waterproof it with waterproof butyl rubber tape (can be purchased in stores) so that water does not leak from the gap of the cable connected to the outside.

  1. Connect the power, I/O, AUDIO, and LAN cables.
  2. Wrap the black cable jacket (Area A) and the cable connection area with waterproof (butyl rubber) tape so that more than half of the butyl rubber tape is overlapped.

Hanwha SNV-8081R - Outdoor installation - 1

If the cable jacket is not waterproofed properly, then it can directly cause leakage. Make sure to protect the cable with a dense layer of taping.
■ Waterproof butyl tape is made of butyl rubber that can be stretched to twice its normal length.

Hanwha SNV-8081R - Outdoor installation - 2

flowchart
graph TD
    A["Camera"] --> B["System"]
    B --> C["Camera"]
    C --> D["System"]
    D --> E["Camera"]
    E --> F["System"]
    style A fill:#f9f,stroke:#333
    style C fill:#ccf,stroke:#333
    style E fill:#cfc,stroke:#333

Hanwha SNV-8081R - Outdoor installation - 3

This camera is waterproof and in compliance with the IP66 spec, but the jack connected to the external cable is not. You are recommended to install this product below the edge of eaves to prevent the cable from being externally exposed.

Precautions before installation

Ensure you read out the following instructions before installing the camera:

  • It must be installed on the area (ceiling or wall) that can withstand 5 times the weight of the camera including the installation bracket.
  • Stuck-in or peeled-off cables can cause damage to the product or a fire.
  • For safety purposes, keep anyone else away from the installation site. And put aside personal belongings from the site, just in case.

Disassembling

  1. With the provided L-wrench and drill bit, loosen 3 bolts on the dome cover counter clockwise to remove the cover.

Dome cover Bolts Camera Body Camera Case

Installation

  1. Using the template provided as an accessory, drill the screw installation hole(diameter of 6mm, minimal depth of 55mm) and firmly insert the plastic anchor provided as an accessory to the end.

  2. Fit the bottom hole to the anchor hole and insert and fix the taping screw (M4.5xL50).

  3. Connect and arrange the necessary cables lest that they should be damaged or twisted while installing the camera.

  4. Adjust the lens in a desired direction by referring to the "Adjusting the monitoring direction for the camera" section. (page 32)

  5. Close the dome cover.

■ To ensure waterproofing, tight up the fixing bolts using the L-wrench and drill bit.

Hanwha SNV-8081R - Installation - 1

natural_image Technical line drawing of a mechanical component with no visible text or symbols

Connecting waterproof power cable and LAN cable

  1. Remove the dome cover and the case.
  2. Pull out the long projected part of the rubber plug on the bottom and remove it as shown in the figure.

- Use an appropriate cable bush for the LAN cable to be connected.

  • Basic camera : Use the cable with a diameter of ∅5\~6.5.
  • Components provided : Use the cable with a diameter of ∅7\~8.5.

Hanwha SNV-8081R - Connecting waterproof power cable and LAN cable - 1

natural_image Technical line drawing of a circular mechanical component with two mounting holes and directional arrows indicating motion (no text or symbols)
  1. Insert the power cable into the small hole made by removing the projected part of the rubber plug in step 2 above, and lay the cable along the long groove.

  2. Connect the power cable with the power terminal block.

Hanwha SNV-8081R - Connecting waterproof power cable and LAN cable - 2

natural_image Technical line drawing of a mechanical device with internal components and wiring (no text or symbols)
  1. Insert the LAN cable into the large hole made by removing the projected part of the rubber plug in step 2 above.

  2. Remove the sheath with a cable cutter, and align the cables.

  3. Connect the LAN cable with a LAN connector, and insert it into the LAN tool.

  4. Connect the finished cable to the Ethernet port.

Hanwha SNV-8081R - Connecting waterproof power cable and LAN cable - 3

natural_image Technical line drawing of a mechanical assembly with no visible text or symbols

Connecting alarm cable

  1. Remove the dome cover and the case.
  2. Pull out the rubber plug on the bottom as shown in the figure.

Hanwha SNV-8081R - Connecting alarm cable - 1

natural_image Technical line drawing of a circular mechanical component with mounting holes and internal components (no text or symbols)
  1. Insert the alarm cable into the hole made by removing the rubber plug in step 2, and connect the cable with the PCB alarm terminal.

  2. Align the cable so that it should not be damaged or jammed when installing the camera.

  3. Put the rubber plug of the alarm cable into the hole.

  4. Adjust the lens in a desired direction by referring to the "Adjusting the monitoring direction for the camera" section. (page 32)

  5. Attach the dome cover.

Hanwha SNV-8081R - Connecting alarm cable - 2

natural_image Technical line drawing of a mechanical device with internal components and a central hub (no text or symbols)

Attaching to the unbundled adapter

Choose and purchase a necessary one of the following options (unbundled) that is suitable to the installation site or for your convenience.

  1. Remove the dome cover from the case by referring to the "Disassembling" section. (page 25)

  2. Use the provided machine screw to fix the camera case to the unbundled adapter.

  3. Connect and arrange the necessary cables lest that they should be damaged or twisted while installing the camera.

  4. Install the camera body in the reverse order of "Disassembling".

  5. Adjust the lens in a desired direction by referring to the "Adjusting the monitoring direction for the camera" section. (page 32)

  6. Close the dome cover.

- To ensure waterproofing, tight up the fixing bolts using the L-wrench and drill bit.

Hanwha SNV-8081R - Attaching to the unbundled adapter - 1

natural_image Technical line drawing of a mechanical assembly with internal components and mounting holes (no text or symbols)

Outdoor installation

When you install it outside of the building, please waterproof it with waterproof butyl rubber tape (can be purchased in stores) so that water does not leak from the gap of the cable connected to the outside.

  1. Connect the power, I/O, AUDIO, and LAN cables.

  2. Wrap the black cable jacket (Area A) and the cable connection area with waterproof (butyl rubber) tape so that more than half of the butyl rubber tape is overlapped.

Hanwha SNV-8081R - Outdoor installation - 1

flowchart
graph TD
    A["Camera"] --> B["Top Layer"]
    B --> C["System"]
    D["Camera"] --> E["Bottom Layer"]
    E --> F["System"]
    G["Camera"] --> H["Bottom Layer"]
    H --> I["System"]
    style A fill:#f9f,stroke:#333
    style D fill:#f9f,stroke:#333
    style G fill:#f9f,stroke:#333
    style B fill:#ccf,stroke:#333
    style E fill:#ccf,stroke:#333
    style H fill:#ccf,stroke:#333
    style I fill:#ccf,stroke:#333

!

If the cable jacket is not waterproofed properly, then it can directly cause leakage. Make sure to protect the cable with a dense layer of taping.

■ Waterproof butyl tape is made of butyl rubber that can be stretched to twice its normal length.

Optional Accessories for Installation

For your easier installation, you can purchase appropriate optional accessories available.

  1. WALL MOUNT ADAPTOR(SBP-300WM or SBP-300WM1)/HANGING MOUNT (SBP-300HM6)

This adaptor is used when installing the dome camera onto a wall.

Hanwha SNV-8081R - Optional Accessories for Installation - 1

natural_image Technical line drawing of three mechanical components: a pipe fitting, a bracket with mounting flange, and a circular base (no text or symbols)
  1. CEILING MOUNT ADAPTOR(SBP-300CM)/HANGING MOUNT(SBP-300HM6)

This adaptor is used when installing the dome camera on a concrete ceiling.

Hanwha SNV-8081R - Optional Accessories for Installation - 2

natural_image Technical line drawing of a flanged bolt and base (no text or symbols)
  1. POLE MOUNT ADAPTOR(SBP-300PM) This is an adaptor for WALL MOUNT ADAPTOR (SBP-300WM or SBP-300WM1) installation on a pole whose diameter is bigger than 80mm.

  2. CORNER MOUNT ADAPTOR (SBP-300KM) This is an adaptor for WALL MOUNT ADAPTOR (SBP-300WM or SBP-300WM1) installation on the corner of wall joint.

Hanwha SNV-8081R - Optional Accessories for Installation - 3

natural_image Technical line drawing of a mechanical housing or bracket with mounting holes and a central circular cutout (no text or symbols)

Hanwha SNV-8081R - Optional Accessories for Installation - 4

natural_image Technical line drawing of a metal bracket with mounting holes and a circular hole (no text or symbols)

Adjusting the monitoring direction for the camera

Pan Tilt Lens rotation

■ Adjusting the monitoring direction

You can adjust the camera direction only when the camera is fixed on the ceiling. Where, rotating the camera unit to the left or right is called Pan, adjusting the tilt is called Tilt, and turning the lens on its axis is called Rotation.

- The effective range of pan is a total of 354 degrees.

- The effective range of rotation is a total of 355 degrees.

- The effective range of tilt is a total of 67 degrees.

Hanwha SNV-8081R - ■ Adjusting the monitoring direction - 1

■ The image can be covered up by the camera case depending on the angle.

- Do not forcefully turn the focus/zoom lens after the dome case is disassembled. Otherwise, it may cause an incorrect focus due to a motor failure.

■ Methods of adjustment

  1. After installing the camera, adjust the panning angle in consideration of the monitoring direction.
  2. Set the horizontal angle so that the image is not reversed.
  3. Adjust the tilt angle so that the camera faces toward the monitoring object.

INSERTING/REMOVING A MICRO SD MEMORY CARD

Hanwha SNV-8081R - INSERTING/REMOVING A MICRO SD MEMORY CARD - 1

■ Disconnect the power cable from the camera before inserting the Micro SD memory card.
- Do not insert the Micro SD memory card while it's upside down by force. Otherwise, it may damage the Micro SD memory card.
- When it rains or the humidity is high, insertion or ejection of a Micro SD card is not recommended.
- Disassembly of the product cover should be finished within 5 minutes, or there will be the risk of internal dew condensation.

Inserting a Micro SD Memory Card (SNO-8081R)

  1. Loosen two screws on the camera.

Hanwha SNV-8081R - Inserting a Micro SD Memory Card (SNO-8081R) - 1

natural_image Technical line drawing of a cylindrical mechanical component with internal gear and mounting bracket (no text or symbols)
  1. Pull and separate the front cover.

Hanwha SNV-8081R - Inserting a Micro SD Memory Card (SNO-8081R) - 2

natural_image Pure mechanical diagram of a cylindrical device with internal components and an arrow indicating direction (no text or symbols)
  1. Insert a Micro SD card in the arrow direction shown in the figure.

DESICCANTS

Inserting a Micro SD Memory Card (SNV-8081R)

  1. Separate the Dome cover of the camera.
  2. Insert a Micro SD card in the arrow direction shown in the figure.

Technical diagram of a device interior with labeled components and directional arrows indicating assembly or movement.

Removing a Micro SD Memory Card

Gently press down on the exposed end of the memory card as shown in the diagram to eject the memory card from the slot.

DESICCANTS

Technical diagram of a device interior with labeled components and directional arrows indicating assembly or movement.

  • Pressing too hard on the Micro SD memory card can cause the card to shoot out uncontrollably from the slot when released.
    Before removing your Micro SD memory card, turn off the camera or go to , turn the device off, and press the [Apply (Apply)] button. (Page 106)
    If you turn off the camera or remove the Micro SD memory card that contains data from the product, the data may be lost or damaged.

MEMORY CARD INFORMATION (NOT INCLUDED)

What is a memory card?

The memory card is an external data storage device that has been developed to offer an entirely new way to record and share video, audio, and text data using digital devices.

Selecting a memory card that's suitable for you

Your camera supports Micro SD/SDHC/SDXC memory cards.

You may, however, experience compatibility issues depending on the model and make of the memory card.

For your camera, we recommend you use a memory card from the following

manufacturers:

Micro SD/SDHC/SDXC Memory Card : Sandisk, Transcend

Memory cards of 4GB \~ 128GB is recommended for using with this camera.

Playback performance can be affected depending on the speed of memory card, so use the high-speed memory card.

For the framerate below 30 fps, it is recommended to use the specification memory card of Class 6 or higher.

For the framerate over 31 fps, it is recommended to use the specification memory card of Class 10 UHS or higher.

Memory Card Components

Contacts

Micro SD/SDHC/SDXC

connectinG witH otHer Device

Power Ethernet Monitor to install

installation & connection

Monitor to install FRONT AC-50V/DC 12V VGA W W W Ethernet Power

The CVBS out terminal of the product is provided for easier installation, and is not recommended for monitoring purposes.

Ethernet Connection

Connect the Ethernet cable to the local network or to the Internet.

Power Supply

Use the screwdriver to connect each line (+, -) of the power cable to the corresponding power port of the camera.

Hanwha SNV-8081R - Power Supply - 1

If you turn on PoE and DC12V and AC24V at the same time, the first applied one will be used as the power source.

  • You can also use a router featuring PoE to supply power to the camera.
  • Use PoE that is compliant with the IEEE 802.3af protocols.

  • Be careful not to reverse the polarity when you connect the power cable.
    ■ AC 24V can be connected in non-polar union.
    If you want to connect an external device, you must turn off the external device before proceeding.

Power Cable Specification for Each Model

In case of DC 12V Input:

Wire Type (AWG) #22 #20 #18
Cable Length (Max.) 24m 38m 60m

In case of AC 24V Input:

Wire Type (AWG) #22 #20 #18
Cable Length (Max.) 34m 55m 88m

Network Cable Specification

Item Contents Remark
Connector RJ45
Ethernet 10/100Base-T 10/100 Mbps
Cable UTP Category 5e
Max Distance 100M
PoE Support IEEE 802.3af

installation & connection

Connecting to Audio Input/Output
Hanwha SNV-8081R - installation & connection - 1

flowchart
graph TD
    A["Speaker"] --> B["Amp"]
    C["Speaker"] --> B
    B --> D["Network"]
    D --> E["Amp"]
    D --> F["Microphone"]
    D --> G["Microphone"]
    E --> H["PC"]
    F --> H
    G --> H
    H --> I["Speaker"]
    H --> J["Speaker"]
    H --> K["Speaker"]
    H --> L["Speaker"]
    H --> M["Speaker"]
    H --> N["Speaker"]
    H --> O["Speaker"]
  1. Connect the AUDIO IN port of the camera with the microphone or LINE OUT port of the amplifier that the microphone is connected to.
  2. Connect the AUDIO OUT port of the camera with the speaker or LINE IN port of the amplifier that the speaker is connected to.
  3. Check the specifications for audio input.

- Audio Codec

  • Audio In : G.711 PCM (Bit Rate: 64kbps / Sampling Frequency: 8kHz), G.726
    ADPCM (Bit Rate: 16Kbps, 24Kbps, 32Kbps, 40Kbps / Sampling Frequency: 8kHz)
  • Audio Out : G.711 PCM (Bit Rate: 64kbps / Sampling Frequency: 8kHz)

• Full duplex Audio

• Audio in : Mono signal line input (Max.2.4 Vpp)
• Audio out : Mono signal line output (Max.2.4 Vpp)
• Line out impedance : 600Ω

Connecting to the I/O port box

Connect the Alarm I/O cable to the corresponding port of the port box.

ARM-O-7 GND ARM-H Alarm (Warning lamp) Sensor

BROWN ALARM-IN ORANGE ALARM-OUT BLACKSIRD Sensor Alarm (Warning lamp)

- ALARM-IN : Used to connect the alarm input sensor or external day/night sensor.

• ALARM-OUT : Used to connect the alarm output signal.
• GND : These are common ports to connect alarm input/output signals.

If devices (e.g., flashing light and siren) that exceed the voltage and current specifications are connected by using the open collector method, it may cause malfunction. Refer to the “Alarm Out Wiring Diagram” when connecting devices that exceed the voltage and current specifications. (page 43)

To connect the external sensor

Connect one strand of each signal line (2-strand) of the sensors to the [ALARM IN] port, and connect the other strand to the [GND] port.

Alarm In Wiring Diagram

External connection Inside of the camera Sensor VCC 3.3V RESISTOR RESISTOR RESISTORALARM IN (5mA SINK) DIODE MLCC TRANSISTOR GND GND

To connect the alarm out

If devices (e.g., flashing light and siren) that exceed the voltage and current specifications are connected by using the open collector method, it may cause malfunction.

Refer to the alarm out connection diagram below when connecting devices that exceed the voltage and current specifications.

Alarm Out Wiring Diagram

External connection Inside of the camera Warning lamp / Siren power (-) (+) Warning lamp / Siren DIODE RELAY DC 5V or 3.3V RESISTOR 10K ohm TRANSISTOR GND GND ALARM OUT (12VDC 20mA MAX) RESISTOR TRANSISTOR GND GND

network connection and setup

You can set up the network settings according to your network configurations.

CONNECTING THE CAMERA DIRECTLY TO LOCAL AREA NETWORKING

Connecting to the camera from a local PC in the LAN

  1. Launch an Internet browser on the local PC.
  2. Enter the IP address of the camera in the address bar of the browser.

Hanwha SNV-8081R - Connecting to the camera from a local PC in the LAN - 1

flowchart
graph TD
    A["Camera"] --> B["Switch"]
    C["Local PC"] --> B
    D["Camera"] --> B
    E["External Remote PC"] --> F["INTERNET"]
    G["DDNS Server (Data Center, KOREA)"] --> F
    style A fill:#f9f,stroke:#333
    style C fill:#f9f,stroke:#333
    style D fill:#f9f,stroke:#333
    style E fill:#f9f,stroke:#333
    style F fill:#ccf,stroke:#333
    style G fill:#ccf,stroke:#333

Hanwha SNV-8081R - Connecting to the camera from a local PC in the LAN - 2

A remote PC in an external Internet out of the LAN network may not be able to connect to the camera installed in the intranet if the port-forwarding is not properly set or a firewall is set. In this case, to resolve the problem, contact your network administrator.
In the IP installer, you can use the initial password, "4321" to set IP Address, Subnet Mask, Gateway, HTTP Port, VNP Port, IP type. After changing the network interface, for better security, access the web viewer and change the password.
By factory default, the IP address will be assigned from the DHCP server automatically. If there is no DHCP server available, the IP address will be set to 192.168.1.100.
To change the IP address, use the IP Installer.
For further details on IP Installer use, refer to "Static IP Setup". (Page 49)

CONNECTING THE CAMERA DIRECTLY TO A DHCP BASED DSL/CABLE MODEM

Hanwha SNV-8081R - CONNECTING THE CAMERA DIRECTLY TO A DHCP BASED DSL/CABLE MODEM - 1

flowchart
graph LR
    A["Camera"] --> B["DSL/Cable Modem"]
    B --> C["INTERNET"]
    C --> D["External Remote PC"]
    C --> E["DDNS Server (Data Center, KOREA)"]
  1. Connect the user PC directly with the network camera.
  2. Run the IP Installer and change the IP address of the camera so that you can use the web browser on your desktop to connect to the Internet.
  3. Use the Internet browser to connect to the web viewer.
  4. Move to [Setup] page.
  5. Move to [Network] – [DDNS] and configure the DDNS settings.
  6. Move to [Basic] – [IP & Port], and set the IP type to [DHCP].
  7. Connect the camera, which was removed from your PC, directly to the modem.
  8. Restart the camera.

Hanwha SNV-8081R - CONNECTING THE CAMERA DIRECTLY TO A DHCP BASED DSL/CABLE MODEM - 2

■ For configuring the DDNS settings, refer to "DDNS". (page 95)
For registering the DDNS settings, refer to "Registering with DDNS". (page 96)
■ Refer to "IP & Port" for how to setup IP. (page 81)

network connection and setup

CONNECTING THE CAMERA DIRECTLY TO A PPPoE MODEM

Hanwha SNV-8081R - CONNECTING THE CAMERA DIRECTLY TO A PPPoE MODEM - 1

flowchart
graph LR
    A["Camera"] --> B["PPPoE Modem"]
    B --> C["INTERNET"]
    C --> D["External Remote PC"]
    C --> E["DDNS Server (Data Center, KOREA)"]
  1. Connect the user PC directly with the network camera.
  2. Run the IP Installer and change the IP address of the camera so that you can use the web browser on your desktop to connect to the Internet.
  3. Use the Internet browser to connect to the web viewer.
  4. Move to [Setup] page.
  5. Move to [Network] – [DDNS] and configure the DDNS settings.
  6. Move to [Basic] – [IP & Port] Setup Page, set the IP type to [PPPoE], and enter the network service's ID and password.
  7. Connect the camera, which was removed from your PC, directly to the modem.
  8. Restart the camera.

Hanwha SNV-8081R - CONNECTING THE CAMERA DIRECTLY TO A PPPoE MODEM - 2

■ For configuring the DDNS settings, refer to "DDNS". (page 95)
For registering the DDNS settings, refer to "Registering with DDNS". (page 96)
■ Refer to "IP & Port" for how to setup IP. (page 81)

CONNECTING THE CAMERA TO A BROADBAND ROUTER WITH THE PPPoE/CABLE MODEM

This is for a small network environment such as homes, SOHO and ordinary shops.

Hanwha SNV-8081R - CONNECTING THE CAMERA TO A BROADBAND ROUTER WITH THE PPPoE/CABLE MODEM - 1

flowchart
graph LR
    A["Camera"] --> B["Broadband Router"]
    C["Local PC"] --> B
    D["Camera"] --> B
    B --> E["PPPoE or Cable Modem"]
    E --> F["INTERNET"]
    G["External Remote PC"] --> H["PPPoE or Cable Modem"]
    H --> F
    I["DDNS Server (Data Center, KOREA)"] --> F

Configuring the network settings of the local PC connected to a Broadband Router

Configuring the network settings of the local PC connected to a Broadband Router, follow the instructions below.

- Select : or .

- Follow the instructions below if you select : ex1) If the address (LAN IP) of the Broadband Router is 192.168.1.1

IP address : 192.168.1.100 Subnet Mask : 255.255.255.0 Default Gateway : 192.168.1.1

ex2) If the address (LAN IP) of the Broadband Router is 192.168.0.1

IP address : 192.168.0.100 Subnet Mask : 255.255.255.0 Default Gateway : 192.168.0.1

ex3) If the address (LAN IP) of the Broadband Router is 192.168.xxx.1

IP address : 192.168.xxx.100 Subnet Mask : 255.255.255.0 Default Gateway : 192.168.xxx.1

Hanwha SNV-8081R - Configuring the network settings of the local PC connected to a Broadband Router - 1

For the address of the Broadband Router, refer to the product's documentation.
For more information about port forwarding of the broadband router, refer to "Port Range Forward (Port Mapping) Setup". (Page 54)

network connection and setup

ButtonS uSeD in ip inStaLLer

1 2 3 4 5 6 7 IP Installer v20 0.2 for the network products IP CAMERA NVR No Device Name Alas Mode MAC Address IP Address Protocol UPL 1 SNO-9081R N/A Static 00:16:6C FS:03:F6 192.168.1,100 IPv http://'192.168.1,100/index.htm Scan Item IPv IPv Search Auto Sat Manual Sat Exit 8 9 10 11 12 13

Item Description
1Device NameModel name of the connected camera.Click the column to sort the list by model name.However, search will be stopped if clicked during the search.
2Alias This function is not currently implemented.
3ModeDisplays either, or for the current network connection status.
4MAC(Ethernet) AddressEthernet address for the connected camera.Click the column to sort the list by Ethernet address.However, search will be stopped if clicked during the search.
5IP AddressIP address.Click the column to sort the list by IP address.However, search will be stopped if clicked during the search.
6ProtocolNetwork setting for the camera.The factory default is “IPv4”.Cameras with the IPv6 setting will be displayed “IPv6”.
7URLDDNS URL address enabling access from the external Internet. However, this will be replaced with theof the camera if DDNS registration has failed.
8IPv4 Scans for cameras with the IPv4 setting.
9IPv6Scans for cameras with the IPv6 setting. Activated in an IPv6 compliant environment only.
10SearchScans for cameras that are currently connected to the network. However, this button will be grayed out if neither IPv4 nor IPv6 is checked.
11Auto Set The IP Installer automatically configures the network settings.
12Manual Set You should configure the network settings manually.
13Exit Exits the IP Installer program.

Hanwha SNV-8081R - ButtonS uSeD in ip inStaLLer - 2

For the IP installer, use only the installer version provided in the installation CD or use the latest one if available. You can download the latest version from the Hanwha Techwin web site.

STATIC IP SETUP

Manual Network Setup

Run to display the camera search list.

At the initial startup, both [Auto Set] and [Manual Set] will be grayed out.

Hanwha SNV-8081R - Manual Network Setup - 1

- For cameras found with the IPv6 setting, these buttons will be grayed out as the cameras do not support this function.

  1. Select a camera in the search list. Check the MAC address of the camera on the camera's label.
    Both the [Auto Set] and [Manual Set] buttons will be activated.

  2. Click [Manual Set].

The Manual Setting dialog appears.

, ,

, , and of the camera are displayed in the preset values.

Program Files (File Edit) Options No. | Control Name | Init | Prev | MAC Address | IP Address | Protocol | OK. 1 | 007-488 B | 5x3 | 1006 | 00702 PC/DCN | PC NO.1.00 | IP4 | 16_279C/067.103(bda).llo Scan Item Q IP4 Q IP6 Search Comment Insert End

network connection and setup

  1. In the
    pane, provide the necessary information.

- MAC (Ethernet) Address : The MAC address imprinted on the camera label is automatically displayed and requires no user setting.

Hanwha SNV-8081R - network connection and setup - 1

■ IP related parameters can be set only when DHCP is not checked.

Manual Setting Address C PPRVE C DHCP G STATIC MAC Address 00.165C F5E0.P8 IP Address 192 . 160 . 1 . 100 Subnet Mask 255 . 255 . 255 . 0 Gateway 192 . 160 . 1 . 1 Password Port HTTP Port 80 WNP Port #C10 OK Cancel

If not using a Broadband Router

For setting , , and , contact your network administrator.

  1. In the pane, provide necessary information.

  2. HTTP Port : Used to access the camera using the Internet browser, defaulted to 80.
    • VNP Port : Used to control the video signal transfer, defaulted to 4520.

Manual Setting Address PPPoE DHCP STATIC MAC Address 00.169C.F5E0F6 IP Address 192 . 160 . 1 . 100 Subnet Mask 255 . 255 . 255 . 0 Gateway 192 . 160 . 1 . 1 Password Port HTTP Port 80 WNP Port #20 OK Cancel

  1. Enter the password.

Enter the password of "admin" account, which was used to access the camera.

Hanwha SNV-8081R - If not using a Broadband Router - 2

For the security purposes, you are recommended to use a combination of numbers, alphabets uppercase and lowercase and special characters for your password.
If you want to change the password, refer to "Administrator password change" of the user setup. (page 78)

  1. Click [OK].

Manual network setup will be completed.

If using a Broadband Router

- IP Address : Enter an address falling in the IP range provided by the Broadband Router.

ex)192.168.1.2\~254, 192.168.0.2\~254, 192.168.XXX.2\~254

- Subnet Mask : The of the Broadband Router will be the of the camera.

- Gateway : The of the Broadband Router will be the of the camera.

Setup Windows & Broad Setup Wireless Security Access Restrictions Application & Setting HKEY: Dwg 1 2000 1 NCORWAN-5000 Internet Setup Internet Connection Type Optional Settings required by some (SPs) Automatic Configuration - DHCP Router Name: Router_1 Host Name: Dancer Name: MTU: Manual Size: 1400 Network Setup Router IP LocalIP Audience: 192.168.1.1 Subnet Mask: 265.266.266.0

Hanwha SNV-8081R - If using a Broadband Router - 2

- The settings may differ depending on the connected Broadband Router model. For more information, refer to the user manual of the applicable router.

For more information about port forwarding of the broadband router, refer to "Port Range Forward (Port Mapping) Setup". (Page 54)

If the Broadband Router has more than one camera connected

Configure the IP related settings and the Port related settings distinctly with each other. ex)

Category Camera #1 Camera #2
IP related settingsIP Address192.168.1.100192.168.1.101
Subnet Mask255.255.255.0255.255.255.0
Gateway192.168.1.1192.168.1.1
Port related settingsHTTP Port80808081
VNP Port45204521

Hanwha SNV-8081R - If the Broadband Router has more than one camera connected - 1

If the is set other than 80, you must provide the number in the address bar of the Internet browser before you can access the camera.

ex) http://IP address: HTTP Port http://192.168.1.100:8080

network connection and setup

Auto Network Setup

Run to display the camera search list.

At the initial startup, both [Auto Set] and [Manual Set] will be grayed out.

Hanwha SNV-8081R - Auto Network Setup - 1

- For cameras found with the IPv6 setting, these buttons will be grayed out as the cameras do not support this function.

  1. Select a camera in the search list. Check the MAC address of the camera on the camera's label. Both the [Auto Set] and [Manual Set] buttons will be activated.

  2. Click [Auto Set]. The Auto Setting dialog appears. The , , and will be set automatically.

  3. Enter the password. Enter the password of "admin" account, which was used to access the camera.

Hanwha SNV-8081R - Auto Network Setup - 2

- For the security purposes, you are recommended to use a combination of numbers, alphabets uppercase and lowercase and special characters for your password. - If you want to change the password, refer to "Administrator password change" of the user setup. (page 78)

File 1: C:\Users\My Documents\Proct No. 1: C:\Users\My Documents\My Documents\My Documents\Proct 1: C:\Users\My Documents\My Documents\Proct 02-03-08/15 03-04-09/15 04-05-10/15 05-06-11/15 06-07-12/15 07-08-13/15 08-09-14/15 09-10-15/15 10-11-16/15 11-12-17/15 12-13-18/15 13-14-19/15 14-15-20/15 15-16-21/15 16-17-22/15 17-18-23/15 18-19-24/15 19-20-25/15 20-21-26/15 21-22-27/15 22-23-28/15 23-24-29/15 24-25-30/15 25-26-31/15 26-27-32/15 27-28-33/15 28-29-34/15 29-30-35/15 30-31-36/15 31-32-37/15 32-33-38/15 33-34-39/15 34-35-40/15 35-36-41/15 36-37-42/15 37-38-43/15 38-39-44/15 39-40-45/15 40-41-46/15 41-42-47/15 42-43-48/15 43-44-49/15 44-45-50/15 45-46-51/15 46-47-52/15 47-48-53/15 48-49-54/15 49-50-55/15 50-51-56/15 51-52-57/15 52-53-58/15 53-54-59/15 54-55-60/15 55-56-61/15 56-57-62/15 57-58-63/15 58-59-64/15 59-60-65/15 60-61-66/15 61-62-67/15 62-63-68/15 63-64-69/15 64-65-70/15 65-66-71/15 66-67-72/15 67-68-73/15 68-69-74/15 69-70-75/15 70-71-76/15 71-72-77/15 72-73-78/15 73-74-79/15 74-75-80/15 75-76-81/15 76-77-82/15 77-78-83/15 78-79-84/15 79-80-85/15 80-81-86/15 81-82-87/15 82-83-88/15 83-84-89/15 84-85-90/15 85-86-91/15 86-87-92/15 87-88-93/15 88-89-94/15 89-90-95/15 90-91-96/15 91-92-97/15 92-93-98/15 93-94-99/15 94-95+00/00

Auto Setting Network Information IP Address 192 , 160 , 0 , 254 Subnet Mask 255 , 255 , 255 , 0 Gateway 192 , 160 , 0 , 1 IP Setting Port Mapping Password OK Cancel

  1. Click [OK]. Auto network setup will be completed.

Dynamic IP Environment Setup

• Example of the Dynamic IP environment

  • If a Broadband Router, with cameras connected, is assigned an IP address by the DHCP server
  • If connecting the camera directly to modem using the DHCP protocols
  • If IPs are assigned by the internal DHCP server via the LAN

Checking the Dynamic IP

  1. Run the IP Installer on the user's local computer.

Cameras allocated with address are shown in the list.

  1. Select a camera from the search result.
  2. Click the [Manual Set] button and check the camera's address.

If you uncheck , you can change IP to .

P140000000000000000 File Edit View Help No. | Copy | Image | View | Import | Export | Print 1 | 365-489-8 | N/A | Express | 45%+5%+5%+1% | 162.166.1.187 | Pkt | 162.2788.7881.369/index.mkt Scan Item Pkt | Pkt | Search View For Microsoft Word Help

Manual Setting Address C PPPGE G DHCP C STATIC MAC Address 00 169C F5E0.F6 IP Address 192 . 180 . 1 . 100 Submit Mask 355 . 285 . 255 . 0 Gateway 192 . 180 . 1 . 1 Password OK Cancel

network connection and setup

PORT RANGE FORWARD (PORT MAPPING) SETUP

If you have installed a Broadband Router with a camera connected, you must set the port range forwarding on the Broadband Router so that a remote PC can access the camera in it.

Manual Port Range Forwarding

  1. From the Setup menu of the Broadband Router, select - . For setting the port range forward for a third-party Broadband Router, refer to the user guide of that Broadband Router.

  2. Select and for each connected camera to the Broadband Router. Each port number for the Broadband Router should match that specified in - - from the camera's web viewer menu.

  3. When done, click [Save Settings]. Your settings will be saved.

Applications & Gaming Port Range Forward Port Range Forward Port Range Application Start End Protocol IP Address Inside I 0 0 Eth 192 1851 0 PTBRL 2800 0 2800 Eth 192 1851 100 PTBZ 2801 0 2801 Eth 192 1851 100 RBC 4600 0 4600 Eth 192 1851 100 RBC 4601 0 4601 Eth 192 1851 100 RBC 5800 0 5800 Eth 192 1851 100 RBC 5801 0 5801 Eth 192 1851 100 0 0 0 Eth 192 1851 0 0 0 0 Eth 192 1851 0 0 0 0 Eth 192 1851 0 Save Settings Cancel Changes

Hanwha SNV-8081R - Manual Port Range Forwarding - 2

  • Above sample instructions are based on the CISCO's Broadband Router.
    ■ The settings may differ depending on the connected Broadband Router model.

For more information, refer to the user manual of the applicable router.

Setting up Port Range Forward for several network cameras

  • You can set a rule of Port Forwarding on the Broadband Router device through its configuration web page.
  • A user can change each port using the camera setting screen.

When Camera1 and Camera2 are connected to a router :

Hanwha SNV-8081R - Setting up Port Range Forward for several network cameras - 1

flowchart
graph TD
    A["User"] <--> B["Internet"]
    B <--> A
Broadband Router
Start End Protocol IPAddress
3000 3000 TCP/UDP192.168.1.100
3001 3001 TCP/UDP192.168.1.101
4520 4520 TCP/UDP192.168.1.100
4521 4521 TCP/UDP192.168.1.101
8080 8080 TCP/UDP192.168.1.100
8081 8081 TCP/UDP192.168.1.101

Hanwha SNV-8081R - Setting up Port Range Forward for several network cameras - 2

Hanwha SNV-8081R - Setting up Port Range Forward for several network cameras - 3

Camera1 (192.168.1.100)
HTTP port 8080
Device port 4520
RTSP port 3000
Camera2 (192.168.1.101)
HTTP port 8081
Device port 4521
RTSP port 3001

Hanwha SNV-8081R - Setting up Port Range Forward for several network cameras - 4

- Port forwarding can be done without additional router setup if the router supports the UPnP (Universal Plug and Play) function.

After connecting the network camera, set of to in the "Setup → Network → DDNS" menu.

network connection and setup

connectinG to tHe camera from a SHereD LocaL pc

  1. Run the IP Installer. It will scan for connected cameras and display them as a list.

  2. Double-click a camera to access. The Internet browser starts and connects to the camera.

F:\Program Files\Project\ File Edit View Tools Help 1 - 302-488 E 70A 396.000 025252525252525252525252525252525252525252525252525252525252525252525252525252525252525252525252525252 Search Bar D:\PM_0\PM_ Search Save As Commerce Exit

Hanwha SNV-8081R - connectinG to tHe camera from a SHereD LocaL pc - 2

- Access to the camera can also be gained by typing the camera's IP address in the address bar of the Internet browser.

connectinG to tHe camera from a remote pc via tHe internet

Since using the IP Installer on a remote computer that is not in the Broadband Router's network cluster is not allowed, users can access cameras within a Broadband Router's network by using the camera's DDNS URL.

  1. Before you can access a camera in the Broadband Router network, you should have set the port range forward for the Broadband Router.

  2. From the remote PC, launch the Internet browser and type the DDNS URL address of the camera, or the IP address of the Broadband Router in the address bar. ex) http://www.samsungipolis.com/Product ID

Hanwha SNV-8081R - connectinG to tHe camera from a remote pc via tHe internet - 1

For registering the DDNS settings, refer to "Registering with DDNS". (page 96)

CONNECTING TO THE CAMERA

Normally, you would

  1. Launch the Internet browser.
  2. Type the IP address of the camera in the address bar.
    ex) • IP address (IPv4) : 192.168.1.100
    → http://192.168.1.100
  3. the Login dialog should appear.
  4. IP address (IPv6) : 2001:230:abcd: ffff:0000:0000:ffff:1111
    → http://[2001:230:abcd:ffff:0000
    :0000:ffff:1111] - the Login dialog should appear.

http://181.168.1.100* 181.168.1.109 Windows Security The server 102.368.1.100 at Piola requires a username and password. User name: Password: Remember my credentials OK Cancel

If the HTTP port is other than 80

  1. Launch the Internet browser.
  2. Type the IP address and HTTP port number of the camera in the address bar. ex) IP address : 192.168.1.100:HTTP Port number(8080)
    → http://192.168.1.100:8080 - the Login dialog should appear.

Using URL

  1. Launch the Internet browser.
  2. Type the DDNS URL of the camera in the address bar. ex) URL address : http://www.samsungipolis.com/Product ID - the Login dialog should appear.

Hanwha SNV-8081R - Using URL - 1

■ Network connection is disabled in the LAN only environment.

Connecting via UPnP

  1. Run the client or operating system in support of the UPnP protocol.
  2. Click the camera name for search.

In the Windows operating system, click the camera name searched from the network menu.

- The login window is displayed.

Connecting via Bonjour

  1. Run the client or operating system in support of the Bonjour protocol.
  2. Click the camera name for search.

In the Mac operating system, click the camera name searched from the Bonjour tab of Safari.

- The login window is displayed.

To check the DDNS address

If the camera is connected directly to the DHCP cable modem, DSL modem, or PPPoE modem, the IP address of your network will be changed each time you try to connect to the ISP (Internet Service Provider) server.

If this is the case, you will not be informed of the IP address changed by DDNS.

Once you register a dynamic IP-based device with the DDNS server, you can easily check the changed IP when you try to access the device.

To register your device to the server, visit www.samsungipolis.com and register your device first, and then set the Web Viewer's - to <Samsung

DDNS>, as well as providing that had been used for DDNS registration.

PASSWORD SETTING

When you access the product for the first time, you must register the login password. When the "Password change" window appears, enter the new password.

Hanwha SNV-8081R - PASSWORD SETTING - 1

For a new password with 8 to 9 digits, you must use at least 3 of the following: uppercase/lowercase letters, numbers and special characters. For a password with 10 to 15 digits, you must use at least 2 types of those mentioned.

-Special characters that are allowed.: \~!@#\$%^*()_-+=|{}].?/

  • For higher security, you are not recommended to repeat the same characters or consecutive keyboard inputs for your passwords.
    If you lost your password, you can press the [RESET] button to initialize the product. So, don't lose your password by using a memo pad or memorizing it.

Administrator password change New password Confirm new password . If the password is 8 to 9 letters long, then it should be a combination of at least three types upper/lower case alphabets, numbers and special characters. . If the password is 10 to 15 letters long, then it should be a combination of at least two types upper/lower case alphabets, numbers and special characters. . User name should be different from password. . The following special characters are available for use. ~!@±26%^#[_-+=] ()(-)-v . Don't use 4 or more characters consecutive together. (examples : 1234, abcd) . Don't use 4 or more characters repeated. (examples : III, 1111, xxx)

LOGIN

Whenever you access the camera, the login window appears. Enter the User ID and password to access the camera.

  1. Enter "admin" in the input box.
    The administrator ID, "admin", is fixed and can not be changed.
  2. Enter the password in the input field.
  3. Click [OK]. If you have logged in successfully, you will the Live Viewer screen.

Windows Security The server 192.108.1.100 at iPolis requires a username and password. User name Password Remember my credentials OK Cancel

Hanwha SNV-8081R - LOGIN - 2

- When you access the camera web viewer, pay special attention to the security by checking whether the image data is encrypted.

Hanwha SNV-8081R - LOGIN - 3

If you check the “Remember my credentials” option when your input is done, in future you will be logged in automatically without being prompted to enter the login information.

- You will experience the best video quality if the screen size is 100%. Reducing the ratio may cut the image on the borders.

- If you check the “Remember my credentials” option when your input is done, in future you will be logged in automatically without being prompted to enter the login information. - You will experience the best video quality if the screen size is 100%. Reducing the ratio may cut the image on the borders.

INSTALLING WebViewer PLUGIN

If connecting to a camera for the first time, you will see the installation message. Then, install the required WebViewer Plugin to access the camera and control the video from it in real time.

  1. When the monitoring page is accessed for the very first time, the installation page is displayed. Click [Click Here] to begin installation.

Network Camera Webviewer Plugin Installation/Update. Click Here

If the plug-in installation file download status is suspended at 99% in the Internet Explorer browser, retry it after selecting "Release SmartScreen filter" in "Tool→SmartScreen filter".

  1. Click [Run] in the message window.

  2. Click [Yes] when the notice window saying that all browser windows will be closed.

Steps 4 and 5 will be skipped if no Web Viewer Plug-in is installed.

  1. When the old version of the Web Viewer Plug-in is installed, a notice window saying the old version will be deleted is displayed. Click [Yes] when the notice window is displayed.

Do you want to run or save HTTPWorkVireemnurse (EAT 100) from: 193.166.0.001 Run Save Cancel

HTWViewer for Windows 0.0.403 Setup All browser windows will be closed. Do you want to proceed? Yes No

HTWViewer for Windows 0.0.403 Uninstall HTWViewer for Windows 0.0.403 will be uninstalled. Yes No

  1. Click [OK].

The old version of Web Viewer Plug-in is deleted.

  1. Click [Install] to begin installation of the Web Viewer Plug-in.

HTWViewer for Windows 0.0.403 Uninstall HTWViewer for Windows 0.0.403 uninstallation completed. OK

HTWViewer for Windows 0.0.403 Setup Welcome to the HTWViewer for Windows 0.0.403 Setup Wizard Welcome to Samsung Techwin Network Camera Webviewer Installation. Please make sure all opened browsers are completely closed. Install Cancel

  1. Click [Finish].

Web Viewer Plug-in installation is completed.

Hanwha SNV-8081R - INSTALLING WebViewer PLUGIN - 7

In your internet explorer, if you need to move to the installation screen after installing the webviewer plugin, check whether webviewer_activexplugin_lib. control in the "Tool → Additional Function Management" menu is "Activated". If not, and if there is a persisting problem, then select "Tools → Internet Options → General" and delete all the search records.

HTWViewer for Windows 0.0.403 Setup Completing the HTWViewer for Windows 0.0.403 Setup Wizard HTWViewer for Windows 0.0.403 has been installed on your computer. Click Finish to close this wizard.

uSinG tHe Live Screen

1 2 3 4 5 POLIS NETWORK CAMERA VIEWER Monitoring Playback Setup ADMIN Status Profile View Alarm output 1 Pixel Counter On Off 6 7 8 9 10 11 12 13 14 15

Item Description
1 Monitoring Move to the monitoring screen.
2 PlaybackMove to the screen where you can search for the video recording saved in your Micro SD memory card or NAS.
3 Setup Move to the Setup screen.
4 Profile access informationYou can read the profile information.
5 Viewer ScreenDisplays the Live video on the screen.■ You can use the mouse wheel to activate the digital zooming in Viewer screen.
6 Profile typeYou can select a profile type inunder thesetup menu.■ When the Web Viewer is connected, the profile information currently using is displayed.■ Afterimages can be displayed on the screen under the following conditions if the video is played in the monitoring page:-The resolution is changed due to a profile change.-Incoming data is being slowed due to a network delay when the profile is changed.-The web browser window size and location is changed.■ You cannot watch a profile using H.265 Codec on the web viewer live monitoring screen.
7 Screen OptimizationThe video size of the camera will switch to as big as the Web browser.
8 Fix the resolutionRegardless of the resolution setup configured in the camera, it sets the resolution to 640x480. Press it again to switch back to the default resolution.
9 Full Screen Switchthe current video to the maximum size of the monitor.
10 Capture Saves the snapshot as an image file in the .jpg format.
11 Instant RecordingUsers can store videos to a PC by themselves.■ The H.265 Codec video does not support instant recording.
12 Audio/Microphone ControlEnable Audio and Microphone are control the Audio volume.■ Only the Audio volume can be controlled.
13 Alarm output Activate the Alarm Out port.
14 Pixel Counter It is possible to check the image pixels in a chosen area.
15 Hide the context menuThe left-corner context menu will disappear but only the menu icon.

To capture the snapshot

  1. Click [Capture ( ) on the scene to capture.
  2. When a captured video is saved, a notification message appears.

When using Internet Explorer, the captured video is saved in My Computer / My Documents / Pictures.

In Mac OS, it is saved in “\~/Pictures” or “/Users/{user account}/Pictures/”.

Hanwha SNV-8081R - To capture the snapshot - 1

If you encounter an interrupted video when capturing the image with IE8 on a Windows 7-based PC, deselect "Turn On Protected Mode" from "Tools – Internet Options – Security".
If the screen is not captured by IE browser in Windows 7 or 8, run the IE Browser with the Admin privilege.

To perform instant recording

  1. Press [Instant Recording

Hanwha SNV-8081R - To perform instant recording - 1

  1. To end the recording, press [Instant Recording (☐)] again.

Hanwha SNV-8081R - To perform instant recording - 2

  • Can store manually recorded videos to the user's PC in .avi file format. Specify a path and store your videos.
    ■ The H.265 Codec video does not support instant recording.

To fit the full screen

  1. Click the [Full Screen (☐)] button.
  2. This will fit the Viewer to the full screen.
  3. To exit the full screen mode, press [Esc] on the keyboard.

Hanwha SNV-8081R - To fit the full screen - 1

For the Internet Explorer and Google Chrome browser, you can switch to the full screen.

To Use Audio

  1. Click [Audio ( )] icon to activate audio communication.
  2. Use [■] bar to control the volume.

Hanwha SNV-8081R - To Use Audio - 1

If there is no sound from pulling in and out the audio jack while it is in operation, click the [Audio ( )] icon to enable it again.

To Use Microphone

Click [Mic (☐)] icon to activate the microphone.

If you want to count the pixels

  1. Push the [On (on) con and activate it.
  2. Click and drag the mouse over the image to select an area.
  3. The number of pixels in the area will be shown on the screen.

PLAYING THE RECORDED VIDEO

Hanwha SNV-8081R - PLAYING THE RECORDED VIDEO - 1

Before you can play the video, you must configure the record settings. For details on record settings, refer to "Storage". (page 106)

Name of event search screen and its function
WPOLIS NETWORK CAMERA WEBVIEWER Monitoring Playback Setup ADMIN Status Event Search From 02/27/2014 00:00:06 To 01/27/2014 23:58:54 Today Starts input Event search Time Search

Item Description
1 Search range settingSet the search date and time range for data saved in your Micro SD memory card or NAS.
2 Search event settingSet the event type to search within the search period.
3 Event search Run the event search.

To play the content after searching by event

  1. Click the [Playback (✗)] button.
  2. Specify the start time and end time of your search.
  3. Select an event type for your search within the specified period.
  4. Click the [Event search] button. The search results will be displayed in the list.

Multi-Point Camera Audio Enter Monitoring Playback setup switch links

Hanwha SNV-8081R - To play the content after searching by event - 2

■ If more than 800 events are recorded

within the search period, your search will be limited up to the date when the 800th event is recorded.

For instance, if the search period is between 10th and 15th day of the month, and more than 800 events were recorded 10th through 11th, your search will be limited up to 11th day with a total of 800 events, and events after then (from 12th) will not be found.

  1. Select a data item to play in the search list.
  2. Click the [Play (▶)] button.
  3. To stop playing the video, click [Stop (☐)].
  4. To return to the search screen, click [Exit (←)].

POLICE NETWORK CABBEG GREEN Multi-Grain Photo Multi-Grain Video Multi-Grain Video Multi-Grain Video Multi-Grain Video Multi-Grain Video Multi-Grain Video Multi-Grain Video Multi-Grain Video Multi-Grain Video Multi-Grain Video Multi-Grain Video Multi-Grain Video Multi-Grain Video Multi-Grain Video Multi-Grain Video Multisector 100% 200% 300% 400% 500% 600% 700% 800% 900% 1000% 1100% 1200% 1300% 1400% 1500% 1600% 1700% 1800% 1900% 2000% 2100% 2200% 2300% 2400% 2500% 2600% 2700% 2800% 2900% 3000% 3100% 3200% 3300% 3400% 3500% 3600% 3700% 3800% 3900% 4000% 4100% 4200% 4300% 4400% 4500% 4600% 4700% 4800% 4900% 5000% 5100% 5200% 5300% 5400% 5500% 5600% 5700% 5800% 5900% 6000% 6100% 6200% 6300% 6400% 6500% 6600% 6700% 6800% 6900% 7000% 7100% 7200% 7300% 7400% 7500% 7600% 7700% 7800% 7900% 8000% 8100% 8200% 8300% 8400% 8500% 8600% 8700% 8800% 8900% 9000% 9100% 9200% 9300% 9400% 9500% 9600% 9700% 9800% 9900% 100 Multi-Grain Multi-Grain Multi-Grain

Name of time search screen and its function
POLE'S NETWORK CAMERA MEERVIEWER Monitoring Playback Setup ADMIN Status Event Search Time Search 2014 3 2 3 4 5 6 7 8 9 2:00 4:00 6:00 9:00 12:00 14:00 16:00 19:00 20:00 22:00 1

Item Description
1 Time bar The section in the specific period is played by moving the time bar.
2 Search date settingSet the search date using the calendar.■ If there is data saved in your Micro SD memory card or NAS on the day, it is marked as a box on the calendar.
3 SpeakerTo listen to a voice signal (if present) in the recorded video, then activate the voice signal icon when you play it.
4 Screen optimization The camera image is converted to fit the Web browser window.
5 Fix the resolutionRegardless of the resolution setup configured in the camera, it sets the resolution to 800x600. Press it again to switch back to the default resolution.
6 Capture The current image is saved as a .jpg image file.
7 Full screen The current image is converted to cover the maximum size of the monitor.
8 Video information Time data of the replayed video is displayed on the screen.
9 BackupSet the desired date to make a backup copy of video data saved in your Micro SD memory card or NAS.Can be set as up to 5 minutes.

To play after searching by time

  1. Click [Time Search (☐).
  2. Click a desired date in the calendar. The video on the specified date will be played.
  3. If the video playback is stopped, select a time and click [Play ( ▶)].

The video on the selected time will be played.

  1. While the video is being played, the recording time for the current video will be shown.

Screenshot of a car parking garage system interface with tool panels and camera settings visible

  1. Search for the video forward or backward, and control the play speed.

- How to Control the Play Interval

▶ : Select this button to move 1 frame forward.
◀: Select this button to move 1 second back.

- To control the play speed

If selecting ▶, the button will switch to x1, x2, x4, x8, and the play speed will increase accordingly.

When the ◀ button is selected, the playing speed is decreased to -1x, -2x, -4x, -8x and the playing speed slows down gradually. Subsequently the quick playing speed is returned to the normal speed and the reverse playing speed increases.

- To control the playback direction

If you see the ▶ button with the play speed displayed, the video will be played forward; Whereas, if you see the ◀ button with the play speed displayed, the video will be played backward.

- How to set the time bar

If you press the + button, the details of the time bar section can be viewed. If you press the - button, you can view a wider range of times and the desired time can be selected more easily.

  1. Move [Time bar (Ⅱ)] to a desired time point of the video before playing it.

The time containing a normal recoding file will be highlighted in blue; the time with the event recording will be highlighted in red.

To back up the searched video

  1. During playback, click [icon] on the scene to back up. The scheduling window for backup start and end time appears.

  2. Click [ ] button. The Save As window appears.

  3. Confirm the save path and click [Save] button. The screenshot will be backed up to the specified path.

Backup From To

File Edit Import + Viewdivi > Picture Organise > File Style Favorites Desktop Overload Avant Pack Articles Documents Music Pictures Values Company MPUANGOMA.C2 MPUANGOMY Bds Picture Library Includes Solutions Sample Features Database Player Save as type / [RSTMRC*and] Save Cancel

To play the backup video

The backed up images are saved in an .avi format. Gom Player, VLC Player, and Window Media Player are recommended as the media player compatible with this format.

Hanwha SNV-8081R - To play the backup video - 1

In case of Windows Media Player, download the latest codec from www.windows7codecs.com and install it prior to use.

To Play an AVI File

(1) Micro SD memory card

  1. Separate the Micro SD memory card from the camera.

Before separating the Micro SD memory card, set the to in the "Setup → Event → Storage" menu.

  1. Insert the Micro SD memory card into the PC.

  2. Play the AVI file in the "\ch00\img\YYYY_mm_DD\AVI" directory, using a media player.

Hanwha SNV-8081R - Micro SD memory card - 1

A filename starts with the format "001_YYYYMMDD_HHMMSS.avi" and the file number is incremented by one. YYYYMMDD_HHMMSS indicates the start time of data saving.

- "001_YYYYMMDD_HHMMSS.smi" file is a caption file, and you can view it if it exists in the same directory as its related AVI file.

■ The max recording time per AVI file is 5 minutes.

- Once corrupted, the data in the Micro SD memory card cannot be replayed in the Web Viewer's [Playback].

Computer Local Disk (C:) LOCAL DISK (D:) data (E:) Removable Disk (G:) ch00 db img 2013_07_02 AVI DAT

Name M1_20130702_168726 M1_20130702_168726.xml M1_20130702_162759 M1_20130702_162759.xml Date modified Type Size 4/13/2013/16:23 AM A#F Dia 4/13/2013/16:23 AM A#F Dia 4/13/2013/16:31 AM A#F Dia 4/13/2013/16:31 AM A#F Dia 4/13/2013/16:31 AM A#F Dia 4/13/2013/16:31 AM A#F Dia 4/13/2013/16:31 AM A#F Dia 4/13 2013/16:23 AM A#F Dia 4/13 2013/16:23 AM A#F Dia 4/13 2013/16:23 AM A#F Dia 4/13 2013/16:23 AM A#F Dia 4/13 2013/16:23 AM A#F Dia 4/13/2013/16:23 AM A#F Dia 4/13 2013/16:23 AM A#F Dia 4/13 2013/16:23 AM A#F Dia 4/13 2013/16:23 AM A#F Dia 4/13 2013/16:23 AM

(2) NAS (Network-Attached Storage)

  1. In Windows browser, use \\ to access. ex)\192.168.20.31\defaultfolder\ch01\ img\2013_07_02\AVI
  2. Go to → Enter 1.
  3. Connected to the NAS. The directory structure is same as the directory structure for a Micro SD memory card.

Hanwha SNV-8081R - NAS (Network-Attached Storage) - 1

A filename starts with the format "001_YYYYMMDD_HHMMSS.avi" and the file number is incremented by one.

YYYYMMDD_HHMMSS indicates the start time of data saving.

Computer defaultfolder(WW192.168.20.31) ch01 db img 2013_07_02 AVI DAT

Name: Date modified Type Size #1_0836752_161726 0:12/0831.16:22 AM KIF7A 400,366 KB #1_0836752_161726.mli 0:12/0831.16:25 AM SHF1a 233 KB #1_0836752_161758 0:12/0831.16:31 AM KIF7A 571,394 KB #1_0836752_161758.mmi 0:12/0831.16:31 AM SHF1a 362 KB

  • "001_YYYYMMDD_HHMMSS.smi" file is a caption file, and you can view it if it exists in the same directory as its related AVI file.
    ■ The max recording time per AVI file is 30 minutes.
    If you change or damage the saved data on your own, it will not play back or save properly.

SETUP

On the network, you can set up basic information on the camera, video and audio, network events and system.

  1. In the Live screen, click[Setup ( Setup )].
  2. The Setup screen appears.

The setting page for preview video requires the web viewer plug-in to be installed on the PC. If it is not installed properly, the installation page automatically appears.

BASIC SETUP

Video profile

  1. From the Setup menu, select the <Basic ( ) tab.
  2. Click
  3. Set the . Changing the mode selection displays a confirmation message regarding the resetting the video configurations. Click [OK] to confirm the changing video settings.

The below configuration items for 2/5 mega modes are saved independently. (Video & Audio : Video setting / Audio setting / Camera setting / Focus setting, Event : Tampering detection / Motion detection / Audio detection (Note: configuration of the operation and operation time is not changed.))

- When changing settings to a 2MB or 5MB mode, the browser window is automatically closed and the camera is rebooted. Please try accessing again later.

PULLO NETWORK CAMERA WMG EYE Monitoring Playback Action Source Video Tools Wire profile View View & View IF & Port View profile View & Stream Network Forum Options Managed Status 2-Proposed 3-Proposed View proximity to wireless security Keep connection when profile information is saved Video profile Name Class Type #1000 Auto select - Record #2.54 #2.54 Default #3.54 #3.54 Movie 7 Movie 7 Details Name Cass: Mobile type: Status profile I set/IF profile I set and profile Audio-to: Low AFC mode: 1.0 AFC modality: 1.0 AFC level: % (1.0 - 100) Properties setting: Animation: 100% (100%) Animation: % (100%) Modifiers: Image (100% + 100%) Advanced Mobile format: Custom: Core image: 1 (100) Color: None Noise coding: None Network color: None Maintenance Condition: Low IF address: Ampl: Ft: Modifiers: Image: IF address: Port: Ft: Apply

4. Set the

- Keep connection when profile setting is changed: Changing profile properties that is used by existing connection does not affect such connection and remains with old profile setup. If not selected, changing a profile used by an existing connection resets such connection.

5. Select each profile properties.

For more details, refer to "To Add/Change the Video Profile". (Page 76)

6. Click the input box of each item and enter / select a desired value.

■ The context menu may differ depending on the selected codec type.
- Default profile : If no profile is selected when using the Web Viewer, the default video profile is applied.

- You cannot select the H.265 Codec as a default profile.

- E-mail/FTP profile : Video profile to be transferred to the specified email or FTP site.

■ Only the MJPEG codec can be set as the E-mail/FTP profile.

- Record profile : This is the profile that is applied to video recording.

■ You cannot select the H.265 Codec as a recording profile.
• Audio-In : Sets whether to use audio for video recordings.

7. According to your situation, set ATC (Auto Transmit Control) mode.

- ATC mode : It adjusts the video properties according to the variance in the network bandwidth, controlling the bit rate. Adjusting the bit rate depends on the ATC mode.

ATC mode 01 ATC sensitivity Very high ATC limit 80 % (10 ~ 50)

  • Control framerate : Reduce the frame rate if the network bandwidth drops down.
  • Control compression : Control the compression rate if the network bandwidth drops down.

Compression adjustment can cause deterioration of the image quality.

If is set to , the encoding priority according to the ATC mode will be fixed as below:

Bitrate control / ATC mode Control framerate Control compression
CBR Framerate Compression

- ATC sensitivity : Affect the transfer rate according to the variance in the network bandwidth.

The transfer rate will be adjusted to the fastest if the bandwidth is , and adjusted to the latest if the bandwidth is .

- ATC limit : If the quality or frame rate is adjusted, the property will be changed to the applied value (%) against the previous setting value (100%).

Note that if you reduce the property value too much, you may encounter flickering on the screen. So it is advisable to adjust the value within the threshold.

Hanwha SNV-8081R - According to your situation, set ATC (Auto Transmit Control) mode. - 2

It is recommended to apply ATC control only for cameras supporting ATC.
- Set the ATC sensitivity to in a network environment with high variance in the network bandwidth.
If the network connection is unstable, you may encounter flickering on the screen.

  1. When done, click [Apply (Apply)].

To Add/Change the Video Profile

The profile setup can be added or modified to accommodate various profiles depending on the recording conditions.

  1. Select one from the
  2. Provide the name and select a codec.
  3. Specify the conditions under which the codec will be applied.
  4. Specify the details of the selected codec including resolution and frame rate. Click to display the context menu.

- Resolution : Set the video size of the H.264, H.265, and MJPEG files.

- Framerate : Set the max number of video frames per sec.

Hanwha SNV-8081R - To Add/Change the Video Profile - 1

The mode setup in Camera Setup changes the maximum configurable framerate.

Sensor 25 fps 30 fps 50 fps 60 fps
Framerate 1~25 fps 1~30 fps 1~50 fps 1~60 fps

- Maximum bitrate : Set the max bit rate of video when the bit rate control is set to VBR.

Hanwha SNV-8081R - To Add/Change the Video Profile - 2

As the bit rate can be adjusted limitedly according to the resolution, frame rate and screen complexity, the actual bit rate can be greater than the maximum bit rate. So you must consider the use conditions when setting the value.

  • Target bitrate : Set the target bit rate when the bit rate control is set to CBR.
  • Bitrate control : You can select one from constant bit rate and variable bit rate for compression. Fixed bitrate means that the network transmission bitrate is fixed while varying the video quality or frame rate, variable bitrate means that a higher priority is placed on the video quality while varying the bitrate.

Hanwha SNV-8081R - To Add/Change the Video Profile - 3

■ After setting the fixed bit rate for bit control, if you select the video quality priority mode, depending on the complexity of the screen, the actual transmitted frame rate may differ from the frame rate setup in order to guarantee the optimal video quality for the given bit rate.

  • Encoding priority : You can set the priority of video transmission to frame rate or compression.
  • GOV length : It specifies the distance (in terms of number of frames) between two consecutive I-Frames in a video sequence when H.264/H.265 codec was selected. (One I-Frame + 0\~Several P-Frames)

• Profile : You can select the H.264/H.265 profiling method.

- Entropy coding : Reduce the possible compression loss due to encoding.

• Smart codec : Specify the use of Smart codec.

Hanwha SNV-8081R - To Add/Change the Video Profile - 4

The Smart Codec will be active only if the codec is of H.264/H.265 and the compression system is CBR.

• Multicast(SVNP) : Specify the use of the SVNP protocol.

- IP address : Enter an IPv4 address with which you can connect to the IPv4 network.

- Port : Specify the video communication port.

- TTL : Set the TTL for the SVNP packet.

• Multicast(RTP) : Specify the use of the RTP protocol.

- IP address : Enter an IPv4 address with which you can connect to the IPv4 network.

- Port : Specify the video communication port.

- TTL : You can set the TTL for the RTP packet.

Hanwha SNV-8081R - To Add/Change the Video Profile - 5

If you set the Multicast address to 224.0.0.0\~224.0.0.255, multicast may not work properly in all environments. In that case, we recommend you change the multicast address.

What is GOV length?

GOV(Group of Video object planes) is a set of video frames for H.264/H.265 compression, indicating a collection of frames from the initial I-Frame (key frame) to the next I-Frame. GOV consists of 2 kinds of frames: I-Frame and P-Frame.

I-Frame is the basic frame for the compression, also known as Key Frame, which contains one complete image data. P-Frame contains only the data that has changed from the preceding I-Frame.

For H.264/H.265 codec, you can determine the GOV length. If you set a recording profile with H.264/H.265 codec, the GOV length will be framerate/2.

user

  1. From the Setup menu, select the <Basic ( ) tab.

  2. Click .

  3. Provide the necessary user information.

- Administrator password change : Change the password for the administrator.

Hanwha SNV-8081R - user - 1

For the security purposes, you are recommended to use a combination of numbers, alphabets uppercase and lowercase and special characters for your password.
It is recommended to change your password once every three months.
■ The password length and limits are shown as follows.

-A combination of at least three types of upper case, lower case, numeric, and special characters: 8 to 9 characters.
-A combination of at least two types of upper case, lower case, numeric, and special characters: 10 to 15 characters.
-Should be different from the ID.
- Cannot repeat the same letter, number of special characters more than 4 times.
- Don't use 4 or more characters consecutive together. (examples : 1234, abcd)
- Don't use 4 or more characters repeated. (examples : !!!!, 1111, aaaa)
-Special characters that are allowed.: \~!@#\$%^*() -+=|0|?/?
- After the factory setting, the admin and user passwords are initialized. You need to reset the password.
- When you access the camera web page for the first time or access it after the initialization, you will be moved to the admin password setting menu.
-In this menu, you need to login again with the new password before using the camera web page menus.

Network Settings Default settings Link packet Link packet - If the packet is set to 100% by that link to a combination of access from the user-to-user device or other devices and special parameters. - Link packet is set to 100% by that link to a combination of access from the user-to-user device or other devices and special parameters. - Use user should be different from users. - To follow any different user available for use of @439722, with all users. - With any other user having any computer tool, please call .com. (1) to your own software. For example, 11, 21, 31, 51, 61. Connect details - Make best access Software options: http://www.westnet.com/ Connect of network without configuration Name Layout Access Address Layout Address Target Width • User 100% • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User 100% • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User · • User 100% • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User • User 100% • User • User • User • User ·User ·User ·User ·User ·User ·User ·User ·User ·User ·User • User 100% • User ·User ·User ·User ·User ·User ·User ·User ·User ·User ·User ·User • User 100% ·User ·User ·User ·User ·User ·User ·User ·User ·User ·User ·User - All - All - All - All - All - All - All - All - All - All - All - All - All - All - All - All - All - All - All - All - All - All - All - All - All - All - All - All - All - All - All - All - All - All - +/- +/- +/- +/- +/- +/- +/- +/- +/- +/- +/- +/- +/- +/- +/- +/- +/- +/- +/- +/- +/- +/- +/- +/- +/- +/- +/- +/- +/- +/- +/- +/- +/- +/- +/- Apply

-If the existing password is not matched, when you change the admin password, you cannot change the password.

-After changing your password, if there is a camera connected to a CMS or NVR client, then you need to re-register it with the newly changed password. If the camera is still connected with the same password, then the account may be locked because a client uses the previous password.

If you try to login with the registered account, 5 or more consecutive password authentication has failed, and then the account may be locked for thirty seconds.
- When the password is changed while multiple connections are active from a PC, the browser may malfunction. In that case, reconnect to the server.

- Guest setup : If you select , the guest account can access the Web viewer screen but can only view the live Viewer screen.

- The ID/password for the guest account is , which cannot be changed.

  • Authentication setup : If you select , you can access RTSP without logging in and view the video.
  • Current users: If you select , you can set or change the user permissions.

■ The manager can set up audio input/output and alarm output.
■ Profile : If you select , you can only see the default profile video; if selecting , you can see the full profile videos.

ONVIF functions available to a registered user allowed to use ONVIF functions are limited to those of granted with permission.

■ Video Transfer and Changing Video Information: Set the profile to , and set Audio Input and Audio Output.
■ Video Transfer, Changing Video Information, Alarm Output : Set the profile to , and select at your preference for the rest.

  1. When done, click [Apply (Apply)].

Date & Time

  1. From the Setup menu, select the <Basic ( ) tab.
  2. Click .
  3. Specify the time and date that will be applied to the camera.

  4. Current system time : Displays the current time settings of your system.

  5. Timezone : Specify the local time zone based on the GMT.
  6. Use daylight saving time : If checked, the time will be set one hour before the local time zone for the specified time period.

This option will be displayed only in areas where DST is applied.

PCCB NETWORK CAMERA NEW ENTER Monitoring Phybeek Setup ACRES Status Data Video quality Gray Data & Time All time Event setup White & Beige Network Local Service Current screen size Data & Time Transcount Photo: Web Connection User Update Window/ video size Use Insight using time Shift time End Time Apply Parameters: other settings Manual Data & Time Hyperparameters with TCP survey Advanced Advanced Advanced Advanced Advanced Transmitter with PC, video Data & Time Apply

- System time setup : Specify the time and date that will be applied to your system.

  • Manual : Specify the time manually.
  • Synchronize with NTP server : Sync with the time of the specified server address.
  • Synchronize with PC viewer : Sets to the time of the computer connected.

  • When done, click [Apply (Apply)].

Hanwha SNV-8081R - Date &amp; Time - 2

If you select the , the standard timezone should be set the same as the current timezone in PC.

IP & Port

  1. From the Setup menu, select the <Basic ( ) tab.
  2. Click .
  3. Set the .

• IP type : Select an IP connection type

  • Manual : Specify the IP address, Subnet mask, Gateway, DNS1, and DNS2.
  • DHCP : Specify the DNS1 and DNS2.
  • PPPoE : Specify the DNS1, DNS2, ID and Password.

If you set it to , you should specify the IP, Subnet mask, Gateway, DNS 1 & 2 manually.

• MAC address : Shows the MAC address.
• IP address : Displays the current IP address.

  • Subnet mask : Displays the for the set IP.
  • Gateway : Displays the for the set IP.
    • DNS1/DNS2 : Displays the DNS(Domain Name Service) server address.

  • Set the .

  • Set to to use IPv6 address.

  • Default : Use the default IPv6 address.
  • DHCP : Display and use the IPv6 address obtained from the DHCP server.
  • Manual : Enter IP address and gateway manually and use it.

Hanwha SNV-8081R - IP &amp; Port - 1

  • The IP addressing system will be defaulted to DHCP. If no DHCP server is found, the previous settings will be restored automatically.
  • Once completed with editing, click [Apply (Apply)] to apply changes and the browser exits. After a while, connect again with the changed IP.

WELL NETWORK CAMERA SECURITY Monitoring Playback Setup Tools Tools Help Name Video audio Gray Audio & Tree IP static Send info View & Audio Smart Direct NetDim Print Options OP type: Normal Other address: OP address: 1000000000000000000000000000000000000000000000000000000000000000000000000000000000000000 IP address: Normal Address name: Normal Channel: Normal GAMES: Normal GAMES: Normal Print options: On Show: Show address: 7 Show voltage: 4 Show channel: 7 Show details: 7 Show colors: 7 Print: Color: Normal Currency: 45.5% QQ off: 25.5% Yes should Device part: 25.5% Apply

  1. Type in each item in the Port menu as necessary.

- HTTP : HTTP port used to access the camera via the web browser. The default is 80(TCP).

- Setting the HTTP port for Safari and Google Chrome browsers to 65535 is not allowed by security policy.

- HTTPS : In this version, the security of the web communication protocol HTTP is strengthened. It can be used when you set HTTPS mode in SSL. The initial value is set to 443(TCP).

The available setting range is 1024\~65535. (For security reasons, in your Safari or Google Chrome browser, you may not use 65535 as your HTTPS port.)

- RTSP : Used to transfer videos in the RTSP mode; the default is 554.

- Use timeout: When connecting to RTSP, this function resets the connection if there's no response for a certain time.

- Device port : Set a port used to transfer video signals with the Samsung protocols.

Hanwha SNV-8081R - IP &amp; Port - 3

■ If changed the HTTP port, the browser exits.
Afterwards, address should contain the newly assigned HTTP port trailing the IP. ex) IP address: 192.168.1.100, HTTP port : Assigned 8080→ http://192.168.1.100:8080 (If HTTP port is set to 80, no need to specify the port number)
- Using RTSP and HTTPS is recommended in order to prevent the image information from being restored.

  1. When done, click [Apply (Apply)].

Event setup

You can easily set the event detection items, and move to the detailed setting.

  1. From the Setup menu, select the tab.

  2. Click .

  3. Activate desired items on the Event list.

  4. When done, click [Apply (Apply)].

1.0.1.2 - NETWORK COLDEN APPROVAL Monitoring Playback Search Action Show Name Video points GIF Data & Data STOCK Dollar key Video & Audio Switch Text Options Search List: Name Position Rank Name Position Action Show Video (RGB) &

Hanwha SNV-8081R - Event setup - 2

- To make detailed event settings, click on your desired settings. Go to detailed setting.

Video setup

  1. From the Setup menu, select the <Video & Audio ( ) tab.
  2. Click
  3. Select a

  4. Flip mode : Turn upside down the image that is captured by the camera.

  5. Mirror mode : Flip horizontal the image that is captured by the camera.
  6. Hallway view : Rotates an image that is captured by the camera by a preset angle.

It is possible to rotate by 0/90/270 degrees.

■ If the setting is changed, browser windows

VOLIO NETWORK DIMAXI/NEVERER Monitoring Phosphor back sides status Audio Video clips Load Cable & Time Off & Post Insert view Video & Audio Video clips Audio clips Camera clips Smart color Photo clips Networks Event Systems Video clips File mode: On Off Monitor clips: No Off Durate view: None Video clips: On Off Video clips: OFF: OK Primary view: Locally: On Off

will be closed and the system rebooted. Please, connect again after a while.

  1. Select Able or Disable for the analog video output.
  2. Select the video type.
  3. Specify the privacy zone.
  4. When done, click [Apply (Apply)].

To set the privacy zone

You can specify a certain area of the camera video to be protected for your privacy.

  1. Set it to .
  2. Click the [Apply (Apply)] button.
  3. Drag to select a desired area on the image.
  4. Enter the name and select the color, and then click [OK].
  5. If you want to delete a name in the list, select it and click [Delete ( Delete )].

Primary class Enable OK Off AM - [9] Name Color Gray OK Custom

Audio setup

You can configure the I/O settings of the audio source from the camera.

  1. From the Setup menu, select the
  2. Click
  3. Set the audio input value.

• Source : Sets the audio input.

  • Line : Connect the cable to the audio device.
  • External microphone : 3.5 pi(φ) jack type external MIC.

• Apply power to Ext. Mic.: If the

POSTS NETWORK DEMERA VIEWERS Monitoring Playfork Method SCREEN Status Book Video audio LIFE Data & Time or audio Graph audio View (View) View value Audio rating Current audio Smart video Transmitting Network Event Appearance Settings Speed: 100% Light power clock pin Color: 5.0% Altance: 0% Gains: 0% Audio (Audio) Settings Type: 0% Off Audio

external microphone connected has no separate power supply, check this option to set camera to supply power to the connected external microphone. The option is enabled if is selected.

ITU standard audio codec that is adequate for digital voice transfer in PSTN network or through a PBX.

- G.726 : ITU standard audio codec applying ADPCM (Adaptive Differential Pulse Code Modulation) for variable bit rates of 40/32/24/16 Kbps to 64 Kbps PCM encoding.

- Bitrate : Set the bit rate to differentiate compression ratio if using G.726 codec.

• Gain : Specify the audio input amplification.

Sound quality deterioration or howling may occur if the loudness of the sound source or gain value were set excessively.

  1. Set the audio output level.

  2. Enable : Sets whether to use audio output.
    • Gain : Specify the audio output amplification.

  3. When done, click [Apply (Apply)].

Camera setup

You can change the camera settings according to the environment where the camera is located.

  1. From the Setup menu, select the
  2. Click .
  3. Configure the settings as necessary of : Sensor, SSDR, White balance, Back light, Exposure, Day/Night, Special, OSD, IR
  4. When done, click [Apply (Apply)] If a certain time (timeout: 240s) is elapsed with your not pressing the [Apply (Apply)] button after changing the settings, your changes will not be applied.

PULL NETWORK CANDRAN WITH ENTER Monitoring Playback Setup Action Status Back Video clips MAP Data & Time If a Post Start setup Video & Audio Video clips Auto setup Camera clips Smart colors Photo info Network Front Switch Monitor Audio Edit Apply

To Set the Sensor

It specifies how many frames the camera CMOS sensor will capture per second.

  1. Select .
  2. Select .

Session: 600K White balance Back Light Exposure Special Day Night OSD LT Mode: 50 fps

Hanwha SNV-8081R - To Set the Sensor - 2

  • Refer to "Video profile" for the framerate setup range of the

To Set SSDR (Samsung Super Dynamic Range)

In a scene where the difference between bright and dark is severe, you can increase the brightness of the dark area alone to regulate the overall brightness.

  1. Select .
  2. Set to .
  3. Configure the and settings as necessary.

• Level : Adjust the level of the dynamic range.
• D-Range : Select the amplitude area of the dynamic range.

Sensor: SS04 Write balance: Back Light Exposure: Special Dual/Model: GSD Mode: DS GIF Level: 12 D-Range: Narrow:

To Set White Balance

You can correct the image colors based on white under any lighting conditions.

1. Select .

2. Select .

- ATW: Corrects the colors of the camera video automatically.

white balance Red gain Blue gain

  • Manual : You can adjust the red and blue gains of the camera video manually.
  • AWC : Corrects the colors of the camera video to be optimized to the current lighting condition and screen mode.

To obtain the optimal condition for the current lighting, put the focus of the camera to a white paper and press the [Set] button. If the lighting environment is changed, you should readjust the settings accordingly.

  • Outdoor : Automatically corrects the video colors of the camera to be optimized to the outdoor environment.
  • Indoor : Automatically corrects the video colors of the camera to be optimized to the indoor environment.

Hanwha SNV-8081R - Select . - 2

In AWC mode, click the [Set] button if you want to keep the white balance level of the current image.

Hanwha SNV-8081R - Select . - 3

■ The white balancing may not work properly in the following conditions:

If this is the case, switch to AWC mode.

-If the surrounding condition of the object is out of the temperature correction range ex) Clear sky, sunset
-If the surrounding of the object is dark
-If the focus of the camera directly faces the fluorescent lighting or if the camera is installed in a place of variable illumination, the white balancing operation may be unstable.

To Set BLC

You can specify a desired area on the video manually and set the area to be displayed more clearly.

  1. Select .

  2. Set to .

  3. Set .

You can change the level to adjust the brightness of the monitoring area.

Harmonic Score Noise Balance Track Light Sequence Harmonic Track Light Score Mode: DC BC Level: Height: MDK Level: Top Bottom Left Right 38 75 26 75

  1. Set the levels to specify the target area.

Hanwha SNV-8081R - To Set BLC - 2

■ When BLC is set, the green box is displayed on the screen for 15 seconds.

■ To prevent malfunction at the time of BLC setup, the vertical space of the BLC area should be over 40 and below 60 while the horizontal space over 30 and below 60.

To Set WDR

It displays a sharp image of the objects in a scene where both bright and dark areas exist.

  1. Select .
  2. Set to .
  3. Specify the .

Hanwha SNV-8081R - To Set WDR - 1

It is recommended to use WDR in the indoor environment.

Media BLK level MOR level Top Bottom Left Right + 30 + 75 + 30 + 75

■ Noise may exist between the dark area and the bright area in the WDR mode.
- When Sensor mode is 50 or 60 fps in 2 M mode, it is impossible to set to .
■ The maximum and minimum shutter values are initialized whenever you turn on or off the WDR mode.
If you use a lens in manual mode, the WDR function may be partially restricted.
■ When using WDR, the frame rate reduces by half.

Example) When using a 30fps mode and the WDR mode, a video of 15fps is output.

To Set Exposure

You can adjust the exposure level of the camera.

1. Select .

  1. Select each item and set it properly.

  2. Brightness: Adjust the screen brightness.
    • Minimum shutter : The limit of the longest exposure time.

■ Shutter is the mode to set up the range of

Sensor: 2008 (photo frame) (image view) Exposure (spot) (play mode) (Auto line) Brightness 50 Minimum shutter 1/7 Maximum shutter 3/143 Anti Fitter 0.6 SSNR 0% SSNR level 13 Dice Racer Labs F-Ne ... ACC High

the sensor exposure time which will specify the upper and lower limits for the electronic shutter movement.

- The framerate may be reduced in the dark condition if Shutter has a lower value than specified in the Sensor mode.

• Maximum shutter : The limit of the shortest exposure time.

- Anti flicker : It prevents screen flickering incurring from the dissonance between the surrounding lighting and the frequency.

• SSNR : Select Able or Disable for the video noise elimination function.

• SSNR level : Adjust the noise reduction level.
- Iris : Select it to set the camera lens to auto or manual.

  • Auto : The iris is automatically adjusted to the amount of the surrounding light.
  • Manual : Sets the iris F-No to manual.
  • P-Iris : This is the depth priority mode. You can close the shutter during the day to get good depths and in the nighttime, you can open the shutter to get more lights.

  • Iris F-No : Set up the F value of the iris.
    • AGC : Select AGC Control mode.

Adjust the gain value of the video (that, in particular, was recorded at a low contrast scene and had a lower brightness level than normal) to control the video brightness.

!

■ The image exposure can be saturated depending on the Shutter setup range.

To Setup Special

1. Select .

  1. Select each item and set it properly.

- Sharpness : Adjust the overall sharpness of the image. If selecting , you can adjust the sharpness of the image.

bevel shariness 0% shariness level 12 Color level 0.45 Gamma 0.9 LDC

- Sharpness level : The higher the level is, the sharper and clearer the outline of the image becomes.

• Color level : Adjust the strength of video color.

• Gamma : Adjust the contrast of the image.

- LDC : To determine whether or not to use the image distortion correction.

Hanwha SNV-8081R - Select . - 2

- When the LDC function is activated, the frame rate is limited to 15fps in the 5MB mode, or 30fps in the 2MB mode.

To Set Day/Night

1. Select .

  1. Select each item and set it properly.

• Mode : Mode is used to adjust the color of Color or Black and White.

- Color : The video is always output in color.

- B/W : The video is always output in black and white.

- Auto : Normally, it is set to Color but to B&W under low luminance at night.

Movie Drawell Size Duration Alarm in Activation Size(Color) Start Size End Size Everyday Sun Hoo Tue Wed The Fri Sat

If AGC of the menu is set to , the day/night mode cannot be set to .

- External : It controls the color of the video when the alarm input terminal is synchronized with an external device.

- Schedule : Set the time during which the camera is operated in the color mode.

- Dwell Time: It specifies the period for which the selected brightness condition must be maintained to switch the lighting mode from Day to Night or vice versa.

• Duration : It specifies the interval of lighting mode conversion.

- Alarm in : The video is set to Color or B/W as the alarm sensor is open or closed.

If the Day/Night mode is set to External Input, the alarm input function of the Event-Alarm Input page is disabled.

- Activation time(Color) : It specifies the schedule for color mode operation.

If it is set, the Color mode is maintained from 00 second of the starting time to 59 second of the ending time.

!

- The Day/Night mode may not operate properly if the lens installed in the camera and the lens set in of the menu don't match.

■ When day and night mode is changed, motion detection events cannot be detected.

To Set OSD

  1. Select .
  2. Select each item and set it properly.

  3. Camera title : It specifies the name of the camera to be displayed on the screen.

  4. Camera title X, Y : It specifies the position of the camera name on the screen.

  5. Date & time : Set the time display and date formats on the screen.

  6. Date & Time X, Y : Specify the position of time display on the screen.
  7. Weekday overlay : Specify the use of date display date on the screen.

Camera Title Use (3-2.0-2.0-8,-) Date & Time Use X Y + 1 + 1 + 1 Weekday Overlay

Hanwha SNV-8081R - To Set OSD - 2

A position-adjustable item (Camera title, Date & Time) may not be displayed normally if it overlaps with another fixed OSD item.

To Set IR

  1. Select .
  2. Select each item and set it properly.

• Mode : When the IR indicator turns

on in B/W mode, the screen will be protected from saturation on the center area so that you can identify a short-distant object.

Mode Auto Level + 50

  • Off : IR mode will be disabled.
  • Auto : Adjust the IR brightness according to the brightness of the object on the center screen.
  • Manual : Adjust the IR brightness manually.

- Level: If you set IR mode to Manual, you can adjust the brightness level of the IR indicator to between 1 and 99.

Smart codec

Set a desired area of the video incoming from the camera as ROI area and specify the detection sensitivity for the area.

  1. From the Setup menu, select the
  2. Click .
  3. Set the image quality. The ROI area will be displayed in the specified quality.
  4. If manually specifying the ROI area, select a desired area with the mouse pointer and drag it as much as you want.

■ You can specify up to 4 distinct areas.

  1. To cancel all the settings for the area, click the [Clear ( Clear )] button.
  2. When done, click [Apply (Apply)].

VOLUME NETWORK CAMERA VIEWER Monitoring Playback Setup Camera Video SKEI Video audio Map Data & Time IF a Post Quick setup Video & audio Video audio Audio setup Camera setup Speed video Power video Network Export Services Quality Microsoft AOSO only View Apply

The Smart codec will not be active if it is set to in

Focus setup

You can adjust the focus and zoom ratio of video image.

  1. From the Setup menu, select the
  2. Click .
  3. Configure the focus using the following procedure.

1) Focus initialize : Push [ ] button to initialize.

■ Caution : Focus initialization is recommended when first used.

2) Zoom : Manually adjusts the zooming (Wide ↔ Tele).
3) Simple focus : Click [◀] button to fit the focus automatically.

PULL NETWORK CAMERA WORK ENTER Monitoring Playback Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Action Reaction Reaction Reaction Reaction Reaction Reaction Reaction Reaction Reaction Reaction Reaction Reaction Reaction Reaction Reaction Reaction Reaction Reaction Reaction Reaction Reaction Reaction Reaction Reaction Reaction Reaction Reaction Reaction

Hanwha SNV-8081R - Focus setup - 2

■ The Simple focus mode may not fit correctly in the following cases:

  • Sudden change to the object in Simple focus mode (sudden movement, appearance or disappearance)
    -Radical change to the brightness in Simple focus mode
  • Image of a low contrast
  • If the camera is exposed to a strong light source in the front or surroundings
  • When focus initialization has not been performed, the focus adjustment may function abnormally.

In case the focus is inappropriate apart from mentioned above, use [-100, -10, -1, +1, +10] button to manually adjust the focus.

In a situation where Simple focus is hardly applied, try to use the manual focus mode.

DDNS

DDNS is an abbreviation of Dynamic Domain Name Service that converts the IP address of a camera into a general Host Name so that the user can easily remember it.

You can use the DDNS service only if the internet is connected.

  1. From the Setup menu, select the tab.
  2. Click .
  3. Select the connection type.
  4. Type in the DDNS items according to the selected type.

- Samsung DDNS : Select this if you use the DDNS server provided by Hanwha Techwin.

  • Product ID : Enter the product ID that is registered with the Samsung DDNS service.
  • Quick connect : It sets port forwarding automatically when used with a UPnP (Universal Plug and Play) supporting router.

Hanwha SNV-8081R - DDNS - 1

If you want to use the DDNS service without using a hub that supports the UPnP function, click Quick connect, then go to the hub menu and activate port forwarding for your hub. For more on how to set port forwarding for your hub, refer to "Port Range Forward (Port Mapping) Setup". (page 54)

- Public DDNS : Select one of provided public DDNS servers when you use a public DDNS server.

  • Service : Select desired public DDNS service server.
  • Host name : Enter the name of the host that is registered with the DDNS server.
  • User name : Enter the user name for the DDNS service.
  • Password : Enter the password for the DDNS service.

  • When done, click [Apply (Apply)].

If selected , be sure to select Samsung DDNS service.

Registering with DDNS

To register your product with the Samsung DDNS

  1. Visit the iPOLiS web site (www.samsungipolis.com) and sign in with a registered account.

Welcome to the IPO DBS website. Samsung:office free DBS service for your convenience. Please register for an account to use the IPO DBS service. Terms of Service (1) Section 1 Period and Postret 1.1 Approach of Terms of Service The following terms and conditions given the IPO DBS Membership (www.samsungjets.com.in) provided by Samsung Tachair Limited Company (the "Company") and the benefit available thereunder (the "Service"). 1.2 Effectiveness and Release of Terms of Service 1.2.1 This Term of Service will be effective by announcement on the terms or notification through email to the individual Member. 1.2.2 The Company near reveal this agreement without prior reply to the Member in case of crucial situation and the invited terms and conditions will be effective with notification in the date manner described is 1.2.2. 1.2.3 If any Member in disagreement with the invited term and condition can request permission, otherwise, the Company will not mention any such authority or the members' rights, and continue to see the benefits.

  1. From the top menu bar, select - .

iPOLiS. WHAT IS POLIS PRODUCT DOGS SERVICE • MY GOINS GOINS SERVICE WIDE TAX NETWORK SEC

  1. Click [PRODUCT REGISTRATION].
  2. Enter the product ID.

■ You must perform the duplicate check for the ID that you entered.

MY DDNS HORN > COM SERVICE > MY DDNS Registered products To add more products to your account, please click on PRODUCT REGISTRATION at the bottom. The STATUS of your product has been updated by an optional time period for DDNS communication, and it may be different from actual status in real time. Product ID SELECT - Product ID, model name, please enter at least 3 characters common - REGISTRATION DATE: 05/06/2018 NO Print ID MODEL LOCATION SYSTEM VIEW IMPORTMENT something EXCEL PRINT : = 1 > PRODUCT REGISTRATION :

  1. Select a and specify the .
  2. Specify the product location with a description if necessary.
  3. Click [REGISTRATION]. The product will be added to the product list that you can check.

My DDNS Register a new iPodUS product and manage your video in real time. * Required information PRODUCTID * IP need to be 4 to 20-digital products (e.g. or 5) and 6 to 8. To register multiply products, please enter their Product ID (e.g. or 1) * In design the product ID, you must delete and press the product * Unobservable ID, store, drain, exon, up, etc., markdown http://www.commsungipolo.com/ Click here from the Product ID CLASSIFICATION * Product * Device product category MODEL NUMBER * Product * Device product model LOCATION * Describe the location to install the custom (or convert) * Recognize the installation location within 10 digital bores. IMPORTATION * Describe position for management purposes REGISTER CANCEL

To connect to the Samsung DDNS in camera setup

  1. From the DDNS setup page, set to .
  2. Provide the that you registered product ID with the DDNS site.
  3. Click [Apply (Apply)]. When the connection is successfully made, you will see the message of <(Success)> on the screen.

IOSM ● off ○ Masking IOSM Server Name: www.osm@iosm.com Product ID: ■ Quick correct ● Public IOSM Service: www.osm@iosm.com Host name: User Name: Pitchout: Apply

Configuring public DDNS in Camera Settings

  1. Open the DDNS settings page and select for .
  2. Enter the corresponding site's host name, user name and password.
  3. Click [Apply (Apply)] button. If the connection properly establishes, <(Success)> appears.
  4. When done, click [Apply (Apply)].

Hanwha SNV-8081R - Configuring public DDNS in Camera Settings - 1

- To use DDNS service properly, both DDNS setup and the router's port forwarding setup are required.

For port forwarding setup, refer to "Port Range Forward (Port Mapping) Setup". (page 54)

IP filtering

You can create a list of IPs that you want to grant or deny access to them.

  1. From the Setup menu, select the tab.
  2. Click .
  3. Select .

  4. Deny : If selecting this, access from those IPs that are added to the filtering will be restricted.

  5. Allow : If selecting this, access from only those IPs that are added to the filtering will be accepted.

  6. Click the [Add ( Add )] button.

The IP list will be created.

Playback Action View Action Video & Audio Audio & Audio Audio & Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Audio Radio Radio Radio & Image Radio & Image Radio & Image Radio & Image Radio & Image Radio & Image Radio & Image Radio & Image Radio & Image Radio & Image Radio & Image Radio & Image Radio & Image Radio & Image Radio & Image Radio & Image Radio & Image Radio & Image Radio & Image Radio & Image Radio & Image Radio & Image Radio & Image Radio & Image Radio & Image Radio & Video

  1. Provide the IP that you want to grant or deny access from.

When you enter an IP address and a Prefix, the list of IP addresses available will appear in the right-side filter range column.

Hanwha SNV-8081R - IP filtering - 2

If selected for IP Filtering and of is set to , both IPv4 and IPv6 addresses of the computer currently configuring should be assigned.
- The IP address of the computer used for the current setup cannot be added to , it should be added to .
- Only the IP addresses that are set to will be displayed in the filter column.

  1. Select an IP to delete from the list.

Click the [Delete ( Delete )] button.

  1. When done, click [Apply (Apply)].

SSL

You can select a secure connection system or install the public certificate for this purpose.

  1. From the Setup menu, select the tab.
  2. Click .
  3. Select a secure connection system.

- To access the camera using HTTPS mode, you have to type the IP address for the camera in the form of "https://". If you failed to configure the Web viewer settings in HTTPS mode with Internet Explorer, edit the Internet options as follows:

WWW.WINDOW.CAMERA.NET.WSPER Monitoring PlayBack Setup ACEN Auto Audio Video profile UAV Color & Tree on a mask Grip tool Video & Audio Network COMS or Abiding PSA WLAN QOL GNDP Auto IP software Event Systems Generate wireless options: HTTP (File not also secure connection) HTTPS (Secure connection mode using a unique certificate) HCPX (Secure connection mode using the public certificate) Send to a positive certificate Base for the certificate: Certificate No: Any File: Install Remove Apply

  1. Search for the public certificate that you want to install on the camera.

To install the certificate on the camera, you need to provide a certificate name (it can be arbitrarily assigned by the user), certificate file issued from the certification authority and a key file.

- The item will be active only if there exists a public certificate installed.

  1. When done, click [Apply (Apply)].

Installing the certificate

  1. Enter the certificate name.
  2. Click the Browse ( ) button, select the public certificate file and key file to be installed, and then click the [Install ( ) install] button.

Deleting the certificate

  1. Click [Delete (Delete)
  2. To delete a public certificate, you should access the network video decoder in the mode of or

802.1x

When connecting network, you can choose whether using 802.1x protocol, and then install the certification.

  1. From the Setup menu, select the tab.
  2. Click <802.1x>.
  3. Set the .

  4. IEEE 802.1x : Specify the use of the 802.1x protocol.
    • EAP type : Select EAP-TLS or LEAP
    • EAPOL version : Select version 1 or 2

  5. ID : Enter the client certificate ID in EAP-TLS and the user ID in LEAP.
  6. Password : Enter the client private

key password in EAP-TLS and the user password in LEAP. You do not have to enter the password in EAP-TLS if it uses a key file that is not encrypted.

POLD NETWORK CAMERA WEB USER Monitoring Playback Setup OK Cancel Show options User Date & Time on a host Event setup Value & Audio Software DONG or Disrup BIL BIL AS OK Start Auto IP configur Send Systems USB: 10000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000 USB: 1.25x 1.25x 1.25x CAP: 1.25x 1.25x 1.25x 1.25x 1.25x 1.25x 1.25x 1.25x 1.25x 1.25x 1.25x 1.25x 1.25x 1.25x 1.25x 1.25x 1.25x 1.3 ASP, cache, IP, Prevalent: Load functions: On certificate: Install: Remove: Remove: Close certificate: Install: Remove: Close private key: Install: Remove: Remove: Apply

Hanwha SNV-8081R - 802.1x - 2

If the connected network device does not support the 802.1x protocol, the protocol will not operate properly even if you set it.
■ LEAP is an authentication method with poor security. Use it only in an environment where EAPTLS is not available.

  1. Install/remove the certificate.

The certificate is needed only for EAP-TLS.

  • CA certificates : Select a public certificate that contains the public key.
  • Client certificate : Select a public certificate that contains the client certificate key.
  • Client private Key : Select a public certificate that contains the client private key.

  • When done, click [Apply (Apply)].

  1. Press the [Browse (Browse)] button for each item and select a certificate to install.
  2. If no certificate is installed, you will see "Not Available" appearing next to the selected item.
  3. Press the [Install (Install)] button to start installation with a message of "Installed" next to the item.
  4. Press the [Delete ( Delete )] button to remove the certificate.

QoS

You can specify the priority to secure a stable transfer rate for a specific IP.

  1. From the Setup menu, select the tab.
  2. Click .
  3. Click the [Add ( Add )] button. The IP list will be created.
  4. Enter an IP address to which you will apply QoS.

Hanwha SNV-8081R - QoS - 1

■ The default prefix for IPv4 is 32; For DSCP, the default is set to 63.
- Only the IP addresses that are set to can be prioritized.

  1. Select an IP to delete from the list. Click the [Delete ( Delete )] button.
  2. When done, click [Apply (Apply)].

WORLD NETWORK CAMERA NEW VIEWER Monitoring Playfork Setup Screen Status Book Video profile View Data & Time If a Post Draft Setup Video & Audio Network DOS If Blending VOL WID 1x OKS Drop Auto if configurs Email Netline Graph View: 23 Edit Edit Add Delete Apply

SNMP

With the SNMP protocols, the system or network admin can monitor the network devices on a remote site, and configure the environment settings.

  1. From the Setup menu, select the tab.
  2. Click .
  3. Specify the .

  4. Enable SNMP v1 : SNMP version 1 will be active.

  5. Enable SNMP v2c : SNMP version 2 will be active.

- Read community : Provide the name of the read community where you can access to the SNMP information.

The default name is .

- Write community : Provide the name of the write community where you can access to the SNMP information. The default name is .

PULLO NETWORK CAMERA NETWINDER Monitoring Playback Setup Comms Name OK Video profile USB Data & Time IF & Image Start Update Video & Audio Networks COMS IF Blending SSL AMD 22 GET SPAP Auto to configur Event Systems ENRIP x1, x2 Enable Open x3 Enable Open x4 Send Connectivity Water connectivity Enable Open Link Community IP address Authentication Info Network extension ENRIP x1 Enable Open x3 Password Apply

- Enable SNMP Trap : SNMP trap is used to send important events and conditions to the Admin.

  • Community : Enter the trap community name to receive messages.
  • IP address : Enter the IP address to which messages will be sent.

- Authentication failure : It specifies whether an event shall be generated when the community information is invalid.

- Network connection : It specifies whether an event shall be generated when the network disconnection is restored.

- Enable SNMP v3 : SNMP version 3 will be active.

- Password : Specify the default password for SNMP version 3.

  • The default password can be exposed to a hacking thread so it is recommended to change the password after installing the product.
    Note that the security and other related issues caused by the unchanged password shall be responsible for the user.
  • Password should be longer than 8 characters, no more than 16 characters.

4. When done, click [apply (Apply)].

Hanwha SNV-8081R - When done, click [apply (Apply)]. - 1

  • SNMP v3 is only able to be set when the secure connection mode is HTTPS. Refer to "SSL". (page 99)
    If you don't use SNMP v3, there may be a security issue.

Auto IP configure

You can set the IP available for access and camera searching automatically.

  1. From the Setup menu, select the tab.
  2. Click .
  3. Set the . An additional IP address may be assigned to assess the camera from the Link-Local network.

  4. Auto configure : It specifies Able or Disable for the Link-Local IPv4 address.

  5. IP address : Display the assigned IP address.
  6. Subnet mask : Display the subnet mask of the assigned IP.

COM 2.0 NETWORK CAMERA NAME VIEW Monitoring Playback setup 查看 status Data Video profile UAV Data & Tree IF a Plot Start Setup Video & Audio Network DOS IF Ordering SSL BDO OK GND Auto IP config(s) Event Systems Link-Select Fixed parameters Auto config(s) iso IF address Subset mask Show document(s) iMail Document(s) iso iMail name Decision Window iso iMail name Apply

  1. Set the .

Cameras can be automatically searched in the client and operating system in support of the UPnP protocol.

  • UPnP discovery : It specifies Able or Disable for UPnP Discovery.
  • Friendly name : Display the camera name.

Friendly name is displayed in the format of WISENET--.

Hanwha SNV-8081R - Auto IP configure - 2

In the Windows operating system which basically supports UPnP, the cameras connected to the network are displayed.

  1. Set the .

Cameras can be automatically searched in the client and operating system in support of the Bonjour protocol.

  • Bonjour : It specifies Able or Disable for Bonjour.
  • Friendly name : Display the camera name.

Friendly name is displayed in the format of WISENET--.

Hanwha SNV-8081R - Auto IP configure - 3

In the Mac operating system, which support Bonjour by default, the connected cameras are automatically displayed in the Bonjour bookmark of the Safari web browser.

If the Bonjour bookmark is not displayed, check Bookmarks Setup in the "Preference" menu.

  1. When done, click [Apply (Apply)].

EVENT SETUP

FTP / E-mail

You can configure the FTP/E-mail server settings so that you can transfer the images taken with camera to your PC if an event occurs.

  1. From the Setup menu, select the tab.
  2. Click .
  3. Select or and enter / select a desired value.

- FTP configuration

  • Server address : Enter the IP address of the FTP server that you transfer the alarm or event images to.
  • ID : Enter the user ID with which you will log in to the FTP server.
  • Password : Enter the user account password for logging into the FTP server.
  • Upload directory : Specify the FTP path where you will transfer the alarm or event images.
  • Port : The default port of the FTP server is 21; however, you can use a different port number according to the FTP server settings.
  • Passive mode : Select if you need to connect in passive mode due to the firewall or the FTP server settings.

NETWORK DATA ReviewER Monitoring Plushork Setup VIEW Data Video profile User Gift & Time of a fast Start info Video & Audio Network Text FTP / Email Storage Alarm input Alarm output Bus objects Temping detector Remote detectors Audio indicators Network characteristics Open mode Customs SIP configurations Server address: ID: Password: Options directory: mult: Private mode: On: Off Apply User configurations Server address: Bus authentication: One SQL: ID: Password: mult: Random: Send: Send: Send: Apply

• E-mail configuration

- Server address : Enter the SMTP address of the email server that you transfer the alarm or event images to.

- Use authentication : Select whether to use authorization.

- Use SSL : Specify the use of SSL.

- ID : Enter the user ID for logging into the email server.

- Password : Enter the user account password for logging into the email server.

- Port : The default port of the email server is 25; however, you can use a different port number according to the email server settings.

- Recipient : Enter the address of the email recipient.

- Sender : Enter the address of the email sender. If the sender address is incorrect, the email from the sender may be classified as SPAM by the email server and thus may not be sent.

- Subject : Enter a subject for your email.

- Body : Provide the text for the massage. Attach the alarm or event images to the email that you are preparing.

  1. When done, click [Apply (Apply)].

Storage

You can activate recording on your device, set the recording conditions, check the saved data capacity and format the device itself.

  1. From the Setup menu, select the tab.
  2. Click .
  3. Select a device to save data in.

Hanwha SNV-8081R - Storage - 1

If your device is properly recording data, it will display "Recording".
If you see an "Error" message, check the following:

  • Check the storage to see if it is connected to the device.
  • Check the files in the storage to see if they are damaged.
  • Check the storage to see if they are physically damaged.

If the "Error" message does not disappear after following the instructions, format the Micro SD card.
After formatting, if the error message still remains, replace the Micro SD card.
If you remove the Micro SD card without changing a button to 'off' position in settings or if you connect a camera to an unstable power source, the Micro SD card may be damaged.

Hanwha SNV-8081R - Storage - 2

■ After operation in record mode, you are limited to 2 simultaneously accessible profiles, and to 3 connected users. However, existing users will be sustained.

Monitoring Playback Monitor Status Storage Sound profile Sound Data & Time of a Post Select Setup Video & Audio Security Direct FPU / Load Settings Audio output Audio input Time subdrive Sampling Options Photo data bus Audio duration Network characteristics Audio Event Systems Background settings Signal Controls Noise Frequency Speed Volume Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output

To make recording on the Micro SD memory

  1. Set the SD card unit to .
  2. Click the [Apply (Apply)] button.
  3. Check the memory card's and .

You can format the Micro SD card by clicking the button.

  • Some frames may be skipped if the Micro SD memory card operates at the lower speed than recommended.
    For more details, refer to "Recommended Micro SD/SDHC/SDXC Memory Card Specifications". (Page 11)

For a Micro SD memory card with a large capacity, the formatting will be slowed down accordingly.

- The data traffic will increase when the camera is set to higher resolution, higher bit rate, and/or higher framerate.

If there is too much data traffic, some frame may be skipped although it is stored in a full frame.

- When a frame skip occurs, images are saved at the rate of min. one image per sec.

  1. Specify the storage action.

- Record profile : Shows recording profile's codec type.

• Normal : Make recording at a certain frame rate.

• Event : Set the recording type for a certain event that occurs.

- Record profile : Shows recording profile's codec type. - Normal : Make recording at a certain frame rate. - Event : Set the recording type for a certain event that occurs.

- Pre event duration : Specify the time point before the occurrence of the event; starting from the time point, the images will be transferred. You can specify up to 5 seconds before the occurrence of the event.

- Post event duration : Specify the time point after the occurrence of the event; to the specified time point, the images will be transferred. You can specify up to 120 seconds after the occurrence of the event.

- Record file type : It specifies the file format of the recorded images.

- Pre event duration : Specify the time point before the occurrence of the event; starting from the time point, the images will be transferred. You can specify up to 5 seconds before the occurrence of the event. - Post event duration : Specify the time point after the occurrence of the event; to the specified time point, the images will be transferred. You can specify up to 120 seconds after the occurrence of the event. - Record file type : It specifies the file format of the recorded images.

- STW : It is Hanwha Techwin's unique file format.

- AVI : It is the conventional avi format.

Hanwha SNV-8081R - To make recording on the Micro SD memory - 1

If the Record file type is changed, the existing data is formatted.

  • Overwrite : If the Micro SD memory is full, this will delete old data and store new data in replacement.
  • Auto delete : Data for a certain period is deleted, while other data is not deleted. This can be set within the range of one day to 180 days.

Hanwha SNV-8081R - To make recording on the Micro SD memory - 2

If the storage period is expired, data is automatically deleted and new data will be recorded. Once deleted, it cannot be recovered.

5. Set .

- Type : The camera supports VFAT and EXT4 for the SD card file system, which can be set by the user. (However, a separate application is required that allows the EXT4 file system to interact with the Windows OS.)

Hanwha SNV-8081R - Set . - 1

If the setting is changed, the existing data will be formatted.
- It takes up to 10 minutes to format the SD card in the ext4 file system.

6. Specify the .

• Always : Always save recorded video in the Micro SD memory card.
■ If set to Always, the activation time cannot be changed.
- Only scheduled time Records only on the specified time of the specified day of week.
• [Clear Clear] Reset all settings.

7. When done, click [Apply (Apply)].

If you want to record in your NAS

1. Set the saving operation and basic recording.

Hanwha SNV-8081R - Set the saving operation and basic recording. - 1

■ Auto deletion is supported only if your NAS meets the recommended specifications.

2. Enter the information registered in your NAS.

  • IP address : Unique IP address assigned to the NAS.
    • ID : An ID registered in the NAS.
  • Password : Password registered in the NAS.
  • Default folder : Designate the NAS user folder to save data in.

POLD NETWORK CAMERA WITH ENTER Monitoring Playback Setup View profile View Data & Info IF & Post Start setup Video & Audio Network Focus FPC (e.g. Web) Decision Auto fixed Auto reset Two records Temporary Allocation False direction Auto deflection Network download App issues Search Monitor and display Record profile: HTTP3 Manual: None Send: 10000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000 Record file type: None Connection: Type Auto deflection: Type - 1944-12 - 1947 Add Connection Setup If address: # Password: Default Name: Type: Account Powered Options: Show: Edit Subscribers Clear Name: Other Apply

  1. Click the [Test] button to see if you can successfully connect to the NAS.

Hanwha SNV-8081R - Enter the information registered in your NAS. - 2

If the success message is displayed, it means that you can successfully save data in the NAS.
■ If the fail message is displayed, check the following.

-Confirm that the IP address of the NAS is valid.

-Confirm that the ID/password of the NAS is valid.

-Confirm that you can access the folder designated as the default folder using the ID of the NAS.

-Confirm that the NAS SMB/CIFS items are unchecked.

-Confirm that the NAS IP address and the camera IP address are in the same format.

ex) The NAS & camera subnet mask initial value is 255.255.255.0.

If the IP address is 192.168.20.32 then the NAS IP address should be in the range of 192.168.20.1\~192.168.20.255.

-Check whether you tried to access as another user without formatting the default folder saved or used.

-Confirm that you used recommended NAS equipment.

  1. After the settings are completed, set the NAS unit to .
  2. Click the [Apply (Apply)] button.
  3. Log in the NAS and check the and .

You can format the default folder specified in the NAS connection setting by clicking the button.

■ Since data may not be saved after a temporary network interruption when using NAS, it is recommended that you use SD at the same time to prevent loss of recorded images.
- The data traffic will increase when the camera is set to higher resolution, higher bit rate, and/or higher framerate.

If there is too much data traffic, some frame may be skipped although it is stored in a full frame.

- When a frame skip occurs, images are saved at the rate of min. one image per sec.

NAS (Network Attached Storage) guide

Hanwha SNV-8081R - NAS (Network Attached Storage) guide - 1

■ Since data may not be saved after a temporary network interruption when using NAS, it is recommended that you use SD at the same time to prevent loss of recorded images.
If the setting allows a Micro SD memory card and the NAS to be simultaneously connected for use, the higher priority for recording goes to the NAS.
If you activate Overwrite to the NAS by setting it to <0ff> and the available capacity is below 10%, it will be saved in the Micro SD card.
If you are saving data in the NAS, you might be unable to save it when you insert a Micro SD memory card used by another camera.
■ NAS recommended specs : Refer to "NAS recommended specs". (Page 11)
If you change the NAS saving while saving data in the NAS, it will not be reflected in the system immediately.
If you remove NAS equipment on your own while saving data, or if the network is disconnected, NAS saving operation will be terminated abnormally.
■ NAS saving allows only one camera to a folder. Logging in with another camera is not allowed, and the images will not be saved.

The following is a description of how to save data using the NAS according to the Synology NAS method, which is one of the recommended products.

  1. Access the Synology NAS as an admin. In this example, the NAS IP Address is set to [192.168.20.253].

DiskStation Remember me

  1. If you access it as an admin, the following screen will be displayed. Click the [Control Panel].
  2. Click the in the file sharing and privilege menu.
  3. Click the [Create] button.
  4. After entering the shared folder name(ID), click the [OK] button to create a shared folder. In this example, the shared folder name is [testDirectory].
  5. In Windows, for NAS access, set the privilege for the shared folder as follows. Check the admin's [Read/Write].
  6. Click on the in the file sharing and privilege menu.

File (Windows) General Outlook Package Manager Package Manager Package Manager Quick Store Quick Store

Control Panel File Sharing and Downloads Share/Share SPT MASCOS GRC Global Shared Paper Shared Service Network Services Work Services CNC Quick Content Software Configuration Stream and Grid Auto Watch Personal Print Applications Internet COM Settings Integrated Options Skillboards Instructions Services and Accounts Mobile Explore Details CDN Layers Application Buildings Application Preferences Application Calendar Ceiling GPS Media Intersecting Services Software Services Task Controller

Fill in the following fields: Name: textDirectory Description: Hide this shared folder in "My Network Places". Enable recycle bin Restrict access to administrators only Hide folders and files from users without permissions Encrypt this shared folder Encryption key: Confirm key: Mount automatically on startup

Edit Shared Folder textDirectory Privileges setup Advanced privileges Local users Search Add Name → Read only Read/Write No access admin

File Mapping and Projecting OpenFlow 100 TP SendTo Live Drive Shared Delete Creates Options Network Services New Services SQLS QuickServices Order Configuration Forward and Out Auto Tools Terminal Grid Systems Networks print settings Application Systems notification Net Security Desktop and Products Bluetooth Hardware Modules COM supplies Application Settings Application Programs Drafting Print Home Ordering Services Networks Buildings New ECONOMICS

setup screen

  1. After clicking the [Create] button, enter name(ID) and password.

In this example, name(ID) is set to [testID] and password is also set to [testID].

According to the NAS recommendations, when you use Netgear's NAS equipment, do not allocate the capacity for use.

  1. In Windows, set the privilege for NAS access.

For the shared folder created in step 4 called "testDirectory" check [Read/Write].

  1. Basic setting in the NAS is completed. Connect your camera to the actual NAS.

As shown below, enter the NAS connection setting items.

  1. After entering item 10, check .

  2. Click the [Apply ( Apply )] button. Finish saving by using the NAS.

Name *: testID Description: Email: Password: ****** Confirm password: ****** Send a notification mail to the newly created user Display user password in notification mail Disallow the user to change account password * This field is required.

User Creation Wizard Add to existing - shared folder Add the folder / Northwest (or include folder) Name: Format: Spread: Image Only 120 Format/No 12 No format add to memory 500 New Image Project: 164.1 software > Help Back Next Cancel

NAS connection setup (Success) IP address 192.168.20.253 ID 4033 Password **** Default folder testDirectory Test

Device Enable Free class Total class Status a 5D Off 0 MB 1 MB Name Format R45 On 741.50 GB 911.45 GB Fusidizing Format

Alarm output

  1. From the Setup menu, select the <Event ( □ tab.

  2. Click .

  3. Set the camera's type of alarm output.

If you change the alarm output type, the alarm out button on the monitoring page and alarm output type displayed on Event Setup page will be changed accordingly.

- Type

- Normal open : Considers "Open circuit" status of the sensor or alarm input device as normal, and triggers alarm event if becomes "Closed circuit" status.

POLD NO TRACK CAMERA KEY KEY Monitoring Physics Balance Balance window Type Normal type Bottom time Above adjusted button Name Pode Pathroposition Duration Apply Video & audio Software K Font HTTP / A read Microsoft Audio INDEX Audio format Video resolutions Temping Flash Actioner Motion response Audio-Blurred Bluetooth Discoverer App feed Systems

- Normal close : Considers "Closed circuit" status of the sensor or alarm input device as normal, and triggers alarm event if becomes "Open circuit" status.

  1. Set the alarm output button.

• Mode : Sets the alarm output method.
There is difference between operations when clicked alarm output button while disabled.
- Pulse : It is activated during the time period specified by the duration (switching interval) and then becomes inactive automatically.
- Active/Inactive : It maintains as activated until the user clicks the button again to make it inactive.
- Duration : Set the alarm duration that maintains activated if the mode is set to pulse, from 1 to 15 seconds.

  1. When done, click [Apply (Apply)].

Alarm input

You can set the alarm input type, activation time, and operation mode.

  1. From the Setup menu, select the tab.
  2. Click .
  3. Set whether or not to .
  4. Select the type.

  5. Normal open: It is normally open, but if it is closed, an alarm will be triggered.

  6. Normal close: It is normally closed, but if it is open, an alarm will be triggered.

  7. Specify the .

PULL NETWORK LABELS WITH ENTER Monitoring Playback stopp ACCR Status Auto Audio profile mail Data & Time at a root Direct setup Writer & Jobs Software Text FST / 2 mail Language Power input Audio input Time collection Comparing distortion Noise distortion Audio deflection Network documentation Size world Systems Input display version Auto Type on Normal app Normal drag Output power output F14 E-mail Record Audio output On Available data class Methods Only subgroups Clear 0x0x1x0x1x0x1x0x1x0x1x0x1x0x1x0x1x0x1x0x1x0x1x0x1x0x1x0x1x0x1x0x1x0x1x0x1x0x1x0x1x0x1x0x1x0x1x0x1x0x1x0x0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.0. OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK

- Always : Always check if an alarm occurs. It activates in operated mode when the alarm occurs.

If set to , the activation time cannot be changed.

- Only scheduled time : Check if an alarm occurs at a specified day of the week for a specified time period. It activates in operated mode when the alarm occurs.

• [Clear (Clear)]: Reset all settings.
- Minute : Click an area in Activation Time and set the time by minutes.
- Hour : Drag your mouse at Activation Time and set the time by hours.

Acceleration Time Always Only scheduled time Clear 29 32 34 36 38 39 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 Sum Base Free 13 80 = To 11 99 OK Cancel Delete Total Total Minutes Hour

  1. Specify an operation that will perform if an alarm occurs.

- FTP : Specify the use of FTP transfer in the alarm input setup.

■ Refer to "FTP / E-mail" for more details. (page 104)

- E-mail : Specify the use of email transfer in the alarm input setup.

■ Refer to "FTP / E-mail" for more details. (page 104)

- Record : Specify the use of recording in the alarm input setup.

■ Set to in . (page 106)

- Alarm output : Select whether to set the alarm output if an alarm is incoming, and specify the alarm output time.

  1. When done, click [Apply (Apply)].

Time schedule

You can set to save the video data at a certain interval as scheduled regardless of the actual occurrence of the event.

  1. From the Setup menu, select the tab.
  2. Click
  3. Set whether or not to .
  4. Specify the .
  5. Specify the .

• Always : Always activates in operated mode at the set interval.
- Only scheduled time : Periodically activates in operated mode at a specified time and date.

Hanwha SNV-8081R - Time schedule - 1

- The transfer interval setting value must be smaller than the preset activation interval to succeed in image transmission.

Monitor Playback Actions Status Events profile Date Date & Time or a time Event setup Value & value Network Launch Play / Run out Storage Alarm name Alarm read Time subdrinks Temping diffraction False detection Audio detection Balance documentation copy text Instances Event version setup Details One image pad Current version setup FTP ACTIVATIVE TIME Notes One updated file Close Timing: 00:00:00 01:00:00 02:00:00 03:00:00 04:00:00 05:00:00 06:00:00 07:00:00 08:00:00 09:00:00 10:00:00 11:00:00 12:00:00 13:00:00 14:00:00 15:00:00 16:00:00 17:00:00 18:00:00 19:00:00 20:00:00 21:00:00 22:00:00 23:00:00 24:00:00 25:00:00 26:00:00 27:00:00 28:00:00 29:00:00 30:00:00 31:00:00 32:00:00 33:00:00 34:00:00 35:00:00 36:00:00 37:00:00 38:00:00 39:00:00 40:00:00 41:00:00 42:00:00 43:00:00 44:00:00 45:00:00 46:00:00 47:00:00 48:00:00 49:00:00 50:00:00 51:00:00 52:00:00 53:00:00 54:00:00 55:00:00 56:00:00 57:00:00 58:00:00 59:00:00 61.1.1.1.2.3.4.5.6.7.8.9.1.1.2.3.4.5.6.7.8.9.1.1.2.3.4.5.6.7.8.9.1.1.2.3.4.5.6.7.8.9.1.1.2.3.4.5.6.7.8.9.1.1.2.3.4.5.6.7.8.1

  1. Specify the activation conditions.

  2. FTP : Specify the use of the FTP transfer if an event occurs.
    ■ Refer to "FTP / E-mail" for more details. (page 104)

  3. When done, click [Apply (Apply)].

Tampering detection

You can set to detect tampering attempts and trigger events, such as sudden change of camera's framing direction, blocked lens and other overall change of scenes from the video.

  1. From the Setup menu, select the tab.
  2. Click .
  3. Set whether or not to .
  4. Set the tampering detection sensitivity. The higher the sensitivity, detects the minutest tampering attempts.
  5. Specify the activation time and activation condition.

For more information about and , refer to "Alarm input". (page 114)

WOLK NETWORK DIRECTOR MODEL Monitoring Playbooks Setup Service Video Help Video audio color Color & Tone or a mask Event setup Video & video Network Forms POP > 2.000 Shortage Audio output Audio input Time schedule Temperature effects Noise effectset Audio deflection Internet decompression app event Timebox Comparing interaction Enable On Off Sensitivity Fixed action settings FTP & clear Record Above output: Active Data Users Browse Days schedule/face Clear 100% 200% 300% 400% 500% 600% 700% 800% 900% 1000% 1100% 1200% 1300% 1400% 1500% 1600% 1700% 1800% 1900% 2000% 2100% 2200% 2300% 2400% 2500% 2600% 2700% 2800% 2900% 3000% 3100% 3200% 3300% 3400% 3500% 3600% 3700% 3800% 3900% 4000% 4100% 4200% 4300% 4400% 4500% 4600% 4700% 4800% 4900% 5000% 5100% 5200% 5300% 5400% 5500% 5600% 5700% 5800% 5900% 6000% 6100% 6200% 6300% 6400% 6500% 6600% 6700% 6800% 6900% 7000% 7100% 7200% 7300% 7400% 7500% 7600% 7700% 7800% 7900% 8000% 8100% 8200% 8300% 8400% 8500% 8600% 8700% 8800% 8900% 9000% 9100% 9200% 9300% 9400% 9500% 9600% 9700% 9800% 9900% 100 Data schedule/time Ready OK

  1. When done, click [Apply (Apply)].

The default tampering detection function may not work properly in the following cases:

  • Under circumstances of simple background or low illumination and night time may lower the detection sensitivity.
    -A severe shaking of the camera or a drastic change to the illumination can be considered a tampering by mistake.
    -Detection of the tampering may take some time (maximum 5 seconds) right after the tampering was made.
    -Once a tampering is detected, the camera will resume a normal operating after a certain stability time (approx. 5 seconds) during which no detection will be performed.

Motion detection

Can be set to generate an event signal when a motion detection event is detected.

  1. From the Setup menu, select the tab.
  2. Click .
  3. Set whether or not to .
  4. Set , and .
  5. Specify the activation time and activation condition.

For more information about and , refer to "Alarm input" (page 114)

  1. When done, click [Apply (Apply)].

SPECIAL NETWORKS MANUAL WITH EYEER Monitoring Playback Tracking WORK Status Auto Video profile Image Data & Info at 4 hours Start time Video & Audio Subway L Speed LPS / A load Speed dram output dram head Wing output Temperature detector Main selection Auto selection Subway Detection Stop out Subway Audio Binding Audio Binding non-activity Input: offset setting E1-F E-mail Microsoft Allow subway Auto selection status Users Data substation status Clear OK Cancel

!

■ Before using, set the minimum and maximum motion sizes to suit desired motion range to be detected.
- Detected size of an object may have difference with the actual size according to its shape.
■ Up to 16 objects from the top side of the screen can be displayed.
In the following cases, motion detection function may be degraded or cause improper detection.

-The object color or brightness is similar to the background.
-Small activities around the border area of the camera's field of view.
-Multiple movements continue occurring at random due to a scene change, rapid lighting changes or other reasons.
-A fixed object continues moving in the same position.
-Motions of less position changing such as approaching to the camera or fading away from the camera.
-Moving object approaches to the camera too close
-An object hides other objects behind.
-Two or more objects overlap or one object divides in multiple portions.
- Too fast object (for a proper detection, one object should be found overlapping between contiguous frames).
-Reflection / blur / shadow due to a strong light such as direct sunlight, illumination, or headlamp.
-In severe snow, rain, wind or in dawn / dusk.

To use Motion detection

It detects a motion that meets all conditions specified by sensitivity, size and area.

  1. Select a motion detection mode.
  2. Select tab to set the sensitivity level. You can set the sensor's sensitivity to detect a motion out of the background from the monitoring video.

In a situation that definitely distinguishes objects out of backgrounds, set this to a low sensitivity level. For opposite case that is hard to distinguish objects like low illuminated situation, set this to a high level.

  1. Select tab.

You can limit the minimum/maximum size of motion to be detected.

  • Minimum size (pixel) : To set the minimum size of detected motions, select and then point and drag to the desired size on the screen using the mouse.
  • Maximum size (pixel) : To set the maximum size of detected motions, select and then point and drag to the desired size on the screen with your mouse.

PULL NETWORK CAMERA WEB ORDER Monitoring Flashbox setup Access Water Setup Video width User Data & Text If a port Start setup Video & Audio Network Local PTU / E-mail Storage Alarm output Alarm hand View thumbnail Turning deflator Pixel detection Auto detection Search documents App exit Interface Radio dimension Color: Or Off Show configuration Community Size 4.0% Size ( Minimum size (min): 100%) width 100% 100% Playbox size (min): 100% width 100% 100% Load window setting: F/m G/mell Hertz Alarm input: 25 Information class: Options Cash-optimized time Close Preview: Linear Apply

- Motions smaller than the specified minimum size or bigger than the maximum size are not detected. To avoid unintended detections caused by great and small noises, set minimum/maximum motion sizes appropriately in accordance to your environments. Note that same motions on the same location can be differently detected in their detection size; it is recommended to consider and include the tolerable difference when setting the minimum/maximum detection sizes.

4. Select tab.

You can specify an area on the screen to include or exclude the area to/from detection.

You can specify up to 4 areas.

  • Detection area: Sets the entire screen as excluded from detection, and adds specified area as motion detection area. To click and drag on a video, and specify a desired detection area.
  • Non detection area: Sets the entire screen as motion detection area, and excludes specified area as not to be detected. To click and drag on a video, and specify a desired non-detection area.

  • To delete an area, right click on the screen to open popup context menu and select Delete, and [OK] button.

  • When done, click [Apply (Apply)].

MODEL NETWORK LAGENS MODE YEAR Monitoring Playback Auto Water & Body Network GPS/73-468 Geometry dawn adjust dawn load View selection Temperature detection Audio selector Audio selection Subram disconnection App boot Settings Balance Administration Customs On Auto Water and Environment Data Current system setup F: 1 E: 0.5 R: 0.25 Alarm values Additive class Options Only color/balance/face Clear Add Remove Add Add Add Add Add Add Add Add Add Add Add Add Add Add Add

Audio detection

You can set to detect sound over the specified level and trigger an event accordingly.

  1. From the Setup menu, select the tab.
  2. Click
  3. Set whether or not to .
  4. Set the audio detection's sound level. The lower the level, the smaller the sound change is detected.

Hanwha SNV-8081R - Audio detection - 1

■ The audio detection level is designed to normalize the input data to a value between 1 and 100 and detect the signal larger than threshold level. It is unrelated to the decibel (dB) level.

  1. Specify the activation time and activation condition.

POLO NETWORK CAMERA WIREWERS Monitoring Playback setup screen status Tools Video audio Text Data & Time IF A User Audio output Video & Audio Software Tout FFT / T read Groups Radio output Audio input True output Temporary output Noise output Audio dimensions Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output Audio output

For more information about and , refer to "Alarm input". (page 114)

  1. When done, click [Apply (Apply)].

Hanwha SNV-8081R - Audio detection - 3

  • Select
  • You can use the audio detection function when the camera is connected with an audio input device.

Network disconnection

When the network is physically disconnected, it is considered as an event to be saved.

  1. From the Setup menu, select the tab.
  2. Click .
  3. Set whether or not to .
  4. Specify the activation time and activation condition.

- For more information about and , refer to "Alarm input". (page 114)

  1. When done, click [Apply (Apply)].

WARNING Playbox setup stop Status AutoCAD distance tracking Enable On Off AutoCAD distance tracking Enable subject Active subject Active subject Open Close AutoCAD distance tracking Open Close AutoCAD distance tracking Open Close AutoCAD distance tracking Open Close AutoCAD distance tracking Open Close AutoCAD distance tracking Open Close AutoCAD distance tracking Open Close AutoCAD distance tracking Open Close AutoCAD distance tracking Open Close AutoCAD distance tracking Open Close AutoCAD distance tracking Open Close AutoCAD distance tracking Open Close AutoCAD distance tracking

App event

You can set the system to generate signals for the events defined on the application. The event signals provided vary depending on the application function.

  1. From the Setup menu, select the tab.
  2. Click .
  3. Set whether or not to .
  4. Specify the activation time and activation condition.

- For more information about and , refer to "Alarm input". (page 114)

  1. When done, click [Apply (Apply)].

TITLE NETWORK ORDERING WORK SYSTEM Monitoring Playback View View tools View & Tools View & View View & Tools Software FPT (1-mail) Message Email input Email output View thumbnail townmail driver Name selection Audio driver System resources Auto mask Customs App 100000 Create OK Cancel Ground custom version FTP E-mail Auto format options Mouse Visa installed/Video Close New... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Save... Sina... Sina...

SYSTEM SETUP

Product information

  1. From the Setup menu, select the <System ( ▶ tab.
  2. Click .
  3. Check the camera information, or provide details according to your network environment.

• Model : Model name of the product.
- Serial number : Product serial number.
• Device name : Provide a device name that will be displayed on the Live screen.
- Location : Specify the location where the camera is installed.

  • Description : Provide detailed information about the camera location.
  • Memo : Provide an explanation about the camera for better understanding.
    • Language : Select a preferred language for the Web Viewer OSD.

Hanwha SNV-8081R - Product information - 1

■ The default language is set to .

  1. When done, click [Apply (Apply)].

PULL NETWORK DIAGRAMS VIEW Chart Monitoring Playfork Setup ACES Value Back Video audio User Data & Tree on a list Direct setup Writer & Audio Network X Event System Product Information Upgrade / Default LAD Current 100% Preview Information Model: Serial number: Blocks name: Location: Description: Name: Parameters: Apply

Upgrade / Reboot

  1. From the Setup menu, select the <System ( ▶ tab.
  2. Click .
  3. Select a desired item and set it appropriately.

  4. Upgrade : Performs upgrading the system.
    • Factory default : Resets the system to the factory default.

- Except network parameter & Open

NETWORK CAMERA VIEWER Monitoring Playback setup ACEN Status Open Video audio Color Com & Time of a Host Send URL Value & Audio Network Send Options Audio Audio Frequency default Language allowed或者使用 iCam iCh Off Event Configuration with recording details Settings Backend General Readend

SDK : Initialize all except for the network setting and lens settings as well as the open SDK installation files and internal settings.

- All : Resets all settings including the camera settings. (however, the log information will not be reset)

- The IP addressing system will be defaulted to DHCP if you reset the camera. If no DHCP server is found, the previous settings will be restored automatically.

  • Configuration backup & Restore : Backs up the current system settings before performing the restoration process. The system is automatically restarts after backup or restoration.
  • Restart: Restarts the system.

To perform the upgrade

  1. Click [Upgrade].
  2. Click [Browse] and specify a file to upgrade.

  3. Click [Send].

  4. The "Upgrade" dialog appears where the progression will be shown in the bottom.

  5. Once completed upgrading, the browser exits and the camera restarts.

Hanwha SNV-8081R - To perform the upgrade - 1

It may take a max of 10 minutes for the upgrade process. If you forcibly terminate the upgrade process, upgrade will not be completed properly.
■ During restarting the system, accessing with web viewer will not be made.
■ You can download the latest version from the Hanwha Techwin web site.

5/W Browse Send

Upgrade - 11% Downloading has started Close

To back up the current settings

  1. Click [Backup]. The Save As dialog should appear.
  2. Specify the backup path with a proper file name, and click [Save]. The backup file will be saved to the specified path in the format of ".bin".

Picture1 Library Includes: 1 instance Sample Features Picture1 Show in type: Configuration/Backup Not/Sim. Show Cancel

To restore the backup settings

  1. To restore the backup settings, click [Restore].
  2. Select a backup file and click [Open].

Hanwha SNV-8081R - To restore the backup settings - 1

If you perform the backup or restoration, the web browser will be closed and the camera will reboots.
If you try to recover the config file backed up in other model, some functions may malfunction and you need to change the setting manually.

Picture Library In Section 1 - Default Sample Validation Backup.dwg File name: Configuration Binding Path: Save Cancel

Log

You can check the system log or event log.

  1. From the Setup menu, select the tab.
  2. Click .
  3. Select a log type.

- System : You can check the system logs where any system changes are recorded including the time information.

• Event : You can check the event logs including the time information.

NETWORK CANDRA KEY SERIES Monitoring Approach OK Cancel Status Send Send Text Send Text from 10 File Edit View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Insert View Inlet View Inlet View Inlet View Inlet View Inlet View Inlet View Inlet View Inlet View Inlet View Inlet View Inlet View Inlet View Inlet View Inlet View Inlet View Inlet View Inlet View Inlet View Inlet View Inlet View Inlet View Inlet View Inlet View Inlet View Inlet View Inset View Inset View Inset View Inset View Inset View Inset View Inset View Inset View Inset View Inset View Inset View Inset View Inset View Inset View Inset View Inset View Inset View Inset View Inset View Inset View Inset View Inset View Inset View Inset View Inset View InSet View InSet View InSet View InSet View InSet View InSet View InSet View InSet View InSet View InSet View InSet View InSet View InSet View InSet View InSet View InSet View InSet View InSet View InSet View InSet View InSet View InSet View InSet View InSet View InSet View Inset10000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000

  1. From the right log list, select an item to search for.

- If you select in the top left dropdown list, all logs for the applicable log type will be displayed.

  1. If one page can not display all the logs available, use the bottom buttons to move to the previous, next, or the last item.
  2. Click on the button to save all the log data for the currently selected mode (system, event) in the "time stamp value create by camera in modelname-mode-camera.txt file" in the download folder for the browser.

Hanwha SNV-8081R - Log - 2

If you want to view the details of a log, click [Info(☐)] in the right column of the log; the log information will be shown in the bottom pane.
■ Each page displays 15 logs with the latest one displayed at the top.
The event/system log list can contain up to 1000 logs; after that, the existing logs will be deleted from the oldest one each time a new log is created.

Open SDK

A user can install an application on their camera to execute additional functions.

  1. From the Setup menu, select the tab.
  2. Click .
  3. Click the [Browse (Browse)] button to select the *.cap file from the user folder.
  4. Click the [Install ( install) ] button to install your application.
  5. The information of the installed application is displayed in the list.

  6. Uninstall : Deletes installed or operating applications.

  7. Go App : Move to the web page of each application.
  8. Start : Execute an installed application.
  9. Stop : Terminates a running application.

  10. Health : Displays the currently running application's resource occupation rate, thread counts and execution time, etc.

  11. Priority : Sets the priority of running applications.

If the total resource utilization rate of the camera (including main tasks and applications) exceeds 80%, an ongoing application will be forced to stop. In this case, the priority set by the user is used to determine which application should be stopped first.

  • Auto start : When the camera's power supply or main task is running, a certain application for which auto execution has been activated will run automatically.
  • Task manager : This displays the resource occupation rate of an application currently running in your camera.

  • Memory Usage (%): This is the memory utilization rate for each application.

  • CPU Usage (%): This is the CPU utilization rate for each application.
  • Thread count : This is the number of threads created by each application.
  • Duration : This is the total execution time of each application.
  • Kill Task : Terminates an application.
  • Total Usage : This is the total resource occupation rate of the camera (including main tasks and applications).

Hanwha SNV-8081R - Open SDK - 1

- For questions about application use or installation, check the Techwin developer website.

Settings Settings Monitoring Preview & Setup Settings Form 1.0 Options Show Send Back Manager File Parameters Options Browse Form1 Log 1

VIEWING PROFILE INFORMATION

Profile access

You can check the profile information.

  1. Click [Status (☐)] on the live screen.
  2. The profile information screen is displayed.

- Profile access : Show the information of the newly added profile.

  • Profile : Show the information of the newly added codec.
  • Bitrate(kbps) : Show both the actual bit rate and the set bit rate.
  • Framerate(fps) : Show both the actual frame rate and the set frame rate.
  • ATC(%) : Show the ATC status.
  • Concurrent users count : Show the number of concurrent users who access the profile.

- Current users : Shows information on users accessing web viewer and displaying monitoring video.

  • Profile : Show the name of the profile accessed by the user.
  • Bitrate(kbps) : Show the current bit rate.
  • Network connection status : It shows whether the network is working fine.
  • IP : Show the IP address of the current user.

Hanwha SNV-8081R - Profile access - 1

- To check information on the profile currently used, click [Status ( )] again to refresh it. It takes a certain time for any changes to be applied.

iPOLIS NETWORK CAMERA NEODRIVER Monitoring Playback Setup Administration Status

Hanwha SNV-8081R - Profile access - 3

ItemsDescription
SNO-8081R SNV-8081R
VideoImaging Device 1/1.8" 6M CMOS
Total Pixels 3096(H) x 2094(V)
Effective Pixels 2616(H) x 1976(V)
Scanning System Progressive Scan
Min. IlluminationColor: 0.3 Lux(1/30sec, F1.3, 50IRE), 0.005Lux(2sec, F1.3, 50IRE)Color: 0.15 Lux(1/30sec, F1.3, 30IRE), 0.003Lux(2sec, F1.3, 30IRE)0 Lux (IR LED On)
S / N Ratio 50dB
Video OutCVBS: 1.0 Vp-p / 75Ω composite, 704x480(N), 704x576(P), for installation - DIP connector type
LensFocal Length (Zoom Ratio)3.93 ~ 9.4mm (2.4x) Motorized Vari focal
Max. Aperture Ratio F1.3
Angular Field of View H: 93.4°(Wide) ~ 39.2°(Tele), V: 68.1°(Wide) ~ 29.3°(Tele)
Min. Object Distance 0.5 m (1.64ft)
Focus ControlSimple Focus (Motorized V/F) / Manual - Remote control via network (Manual, Simple Focus)
Lens Type DC Auto Iris, support P-Iris mode
Mount Type Board-in type
LDC (Lens Distortion Correction)Off/On (Level Auto Control)
Pan / Tilt / RotatePan Range - 0° ~ + 354°
Tilt Range - 0° ~ + 67°
Rotate Range - 0° ~ + 355°
OperationalIR LED 2 ea 4 ea
Viewable Length 30m, Smart IR
Camera Title Off / On (Displayed up to 15 characters)
Day & Night Auto (ICR) / Color / B/W / External / Schedule
Backlight CompensationOff / BLC / WDR
Wide Dynamic Range 120dB
Contrast EnhancementSSDR (Samsung Super Dynamic Range) (Off / On)
Digital Noise ReductionSSNR (2D+3D Noise Filter) (Off / On)
Motion Detection Off / On (4ea, Rectangle)
Privacy MaskingOff / On (6ea, Rectangle)- Color : Black, Blue, Red, Gray, White, Green
Gain Control Off / Low / Medium / High
White Balance ATW / AWC / Manual / Indoor / Outdoor (included Mercury & Sodium)
Electronic Shutter SpeedMinimum / Maximum / Anti flicker (2 ~ 1/12,000sec)
OperationalRotate ImageFlip: On/OffMirror: On/OffHallway: 90°/270°
Intelligent Video AnalyticsTampering, Audio Detection - with Metadata
Alarm I/O Input 1ea / Output 1ea
Alarm TriggersAlarm Input, Motion Detection, Tampering, Audio Detection, Network Disconnect
Alarm eventsFile upload via FTP, E-MailNotification via E-MailLocal storage(SD/SDHC/SDXC) or NAS recording at Event TriggersExternal output
Audio InSelectable (Mic IN/Line IN)Supply voltage: 2.5VDC(4mA), Input impedance: approx. 2K Ohm
Audio out Line out (3.5mm stereo mini jack), Max output level: 1 Vrms
NetworkEthernet RJ-45 (10/100BASE-T)
Video Compression FormatH.265: MainH.264 (MPEG-4 Part 10/AVC): Main/Baseline/HighMotion JPEG
Resolution5M Mode2592x1944 / 2592x1464 / 1920x1080 / 1600x1200 / 1280x1024 / 1280x960 / 1280x720 / 1024x768 / 800x600 / 720x576 / 720x480 / 640x480 / 320x2402M Mode1920x1080 / 1280x1024 / 1280x960 / 1280x720 / 1024x768 / 800x600 / 720x576 / 720x480 / 640x480 / 320x240
NetworkMax. Framerate5M ModeH.264/H.265 : 30 fps in all resolutionsMJPEG2592x1944 ~ 2592x1464 : 2fps1920x1080 ~ 1600x1200 : 4fps1280x1024 ~ 1024x768 : 5fps800x600 ~ 320x240 : 15fps2M ModeH.264/H.265 : 60 fps in all resolutionsMJPEG1920x1080 : 4fps1280x1024 ~ 1024x768 : 5fps800x600 ~ 320x240 : 15fps
Smart Codec Manual Mode (area-based : 4EA)
Video Quality AdjustmentH.264/H.265 : Compression Level, Target Bitrate Level ControlMJPEG : Quality Level Control
Bitrate Control MethodH.264/H.265 : CBR or VBRMotion JPEG : VBR
Streaming CapabilityMultiple Streaming (Up to 3 Profiles)- Total 3 Stream at the same time (including Recording Stream)
Audio Compression FormatG.711 μ-law /G.726 SelectableG.726 (ADPCM) 8KHz, G.711 8KHzG.726 : 16Kbps, 24Kbps, 32Kbps, 40Kbps
NetworkAudio Communication Bi-directional
IP IPv4, IPv6
ProtocolTCP/IP, UDP/IP, RTP(UDP), RTP(TCP), RTCP, RTSP, NTP, HTTP, HTTPS, SSL, DHCP, PPPoE, FTP, SMTP, ICMP, IGMP, SNMPv1/v2c/v3(MIB-2), ARP, DNS, DDNS, QoS, PIM-SM, UPnP, Bonjour
SecurityHTTPS(SSL) Login AuthenticationDigest Login AuthenticationIP Address FilteringUser access Log802.1x Authentication (EAP-TLS, EAP-LEAP)
Streaming Method Unicast / Multicast
Max. User Access 10 users at Unicast Mode
Edge Storagemicro SD/SDHC/SDXC (up to 128G)- motion Images recorded in the SD/SDHC/SDXC memory card can be downloaded.- camera can detect automatically when the memory is connected- memory status display (normal/error/active/formatting/lock)NAS(Network Attached Storage)Local PC for Instant Recording
Application Programming InterfaceONVIF Profile SSUNAPI(HTTP API)SVNPWISENET Open Platform
NetworkWebpage LanguageEnglish, French, German, Spanish, Italian, Chinese, Korean, Russian, Japanese, Swedish, Danish, Portuguese, Czech, Polish, Turkish, Rumanian, Serbian, Dutch, Croatian, Hungarian, Greek, Norsk, Finnish
Web ViewerSupported OS: Windows XP / VISTA / 7 / 8 / 8.1, MAC OS X 10.7 ~ 10.10 Supported Browser: Microsoft Internet Explorer (Ver. 8 ~ 11), Mozilla Firefox (Ver. 9 ~ 35), Google Chrome (Ver. 15 ~ 40), Apple Safari (Ver. 8.0.2(Mac OS X 10.10), 7.0.6(Mac OS X 10.9), 6.0.2 (Mac OS X 10.8, 10.7 only), 5.1.7) ※ Mac OS X only
Central Management SoftwareSmartViewer, SSM
Pixel Counter support
EnvironmentalOperating Temperature / Humidity-40°C ~ +55°C (-40°F ~ +131°F) / Less than 90% RH * Start up should be done at above -35°C
Storage Temperature / Humidity-30°C ~ +60°C (-22°F ~ +140°F) / Less than 90% RH
Ingress Protection IP66
Vandal Resistance IK10
ElectricalInput Voltage 24V AC, 12V DC, PoE (IEEE802.3af class 3)
Power ConsumptionMax. 10W / 11.5W (12V DC, Heater Off/On) Max. 11.5W / 12.95W (PoE, Heater Off/On) Max. 12W / 13.5W (24V AC, Heater Off/On)
MechanicalColor / Material Dark Gray / Aluminum IVORY/Aluminium
DimensionW82.4 x H87 x D348.3 (with bracket) W82.4 x H87 x D178 (without bracket)∅160 x H118.5mm
Weight 1420g 955g

snO-8081r

Unit : mm (inch)

Hanwha SNV-8081R - Profile access - 4

snV-8081r

Unit : mm (inch)

Ø 160 (6.3") 69.5 (2.74") 118.5 (4.67") Ø 100 (3.94")

trOuBLesHOOtinG

PROBLEM SOLUTION
I can't access the camera from a web browser.Check to make sure that the camera's Network settings are appropriate.Check to make sure that all network cables have been connected properly.If connected using DHCP, verify that the camera is able to acquire dynamic IP addresses without any problem.If the camera is connected to a Broadband Router, verify that port forwarding is properly configured.
Viewer got disconnected during monitoring.Connected Viewers become disconnected upon any change to camera or network configurations.Check all network connections.If the camera is connected over an PPPoE network, it's possible for Viewer to disconnect under poor network conditions.
I cannot connect to the system using a tab browser of Internet Explorer 7.0.An error may be generated when connecting with a new window or tab since the cookie data are shared. Do not use a new window or tab, select "File → New session".
The camera connected to the network is not detected in the IP installer program.Turn off the firewall settings on your PC and then search the camera again.
Images overlap.Check whether two or more cameras are set to a single multicast address instead of different addresses. If a single address is used for multiple cameras, the images may overlap.
No image appears.If the transmission method is set to multicast, check whether there is a router that supports multicast in the LAN the camera is connected to.
I cannot watch an H.265 Codec streaming video on the web viewer.The web viewer does not currently support the H.265 Codec. This will be addressed in our next update.To watch an H.265 Codec streaming video, please use a third party viewer such as Smart Viewer or SSM.
of, but no notification e-mail reaches me even when an analysis event had occurred.·Verify the settings in the following sequence:A. Checksettings.B. Theshould be set to.C. Check if theoption ofmenu is checked to use.
No signal is found at the Alarm Output port even when an event is generated.·Check alarm output port settings.
Cannot record into the Micro SD memory card.·Check if the memory card is defective.
Micro SD memory card is inserted but the camera does not operate properly.·Check if the memory card is inserted in the proper direction. Operation of memory card that is formatted by other devices is not guaranteed with this camera unit·Format the memory card again in→→menu.
Cannot record in the NAS.·Confirm that the information registered in the NAS is correct.
It reports that NAS setting has failed.·Confirm that the IP address of the NAS is valid.·Confirm that the ID/password of the NAS is valid.·Confirm that you can access the folder designated as the default folder using the ID of the NAS.·Confirm that the NAS SMB/CIFS items are unchecked.·Confirm that the NAS IP address and the camera IP address are in the same format.ex) The NAS & camera subnet mask initial value is 255.255.255.0. If the IP address is 192.168.20.32 then the NAS IP address should be in the range of 192.168.20.1~192.168.20.255.·Check whether you tried to access as another user without formatting the default folder saved or used.·Confirm that you used recommended NAS equipment.

GPL/LGPL software license

The software included in this product contains copyrighted software that is licensed under the GPL/LGPL. You may obtain the complete Corresponding Source code from us for a period of three years after our last shipment of this product by sending email to help.cctv@hanwha.com

If you want to obtain the complete Corresponding Source code in the physical medium such as CD-ROM, the cost of physically performing source distribution might be charged.

GPL SW

Component Name License URL

Base KernelGPL 3.0
BusyboxGPL 2.0http://www.busybox.net/downloads/snapshots
iproute2-3.1.0GPL 2.0
alsa-utils-1.0.24.2GPL 2.0
alsa-lib-1.0.24.1GPL 2.0
iptables-1.4.12.2GPL 2.0http://ftp.netfilter.org/pub/iptables
ethtool-3.2GPL 2.0
mtd-1.4.1GPL 2.0ftp://ftp.infradead.org/pub/mtd-utils
mii-diag-2.11GPL 2.0
rp-pppoe-3.10GPL 2.0http://www.roaringpenguin.com/pppoe/
wpa_supplicant-0.7.3GPL 2.0
bash-4.2GPL 3.0
zeroconfGPL 2.0

LGPL SW

Component Name License URL

gLibcLGPL 2.0
InetutilsLGPL 3.0
neon-0.29.6LGPL 2.0http://www.webdav.org/neon/
(The Manual and test suite are GPL)

GNU GENERAL PUBLIC LICENSE

Version 2, June 1991

Copyright (C)1989, 1991 Free Software Foundation, Inc. 51 Franklin Street, Fifth Floor, Boston, MA 02110-1301, USA

Everyone is permitted to copy and distribute verbatim copies of this license document, but changing it is not allowed.

Preamble

The licenses for most software are designed to take away your freedom to share and change it. By contrast, the GNU General Public License is intended to guarantee your freedom to share and change free software-- to make sure the software is free for all its users. This General Public License applies to most of the Free Software Foundation's software and to any other program whose authors commit to using it. (Some other Free Software Foundation software is covered by the GNU Lesser General Public License instead.) You can apply it to your programs, too. When we speak of free software, we are referring to freedom, not price. Our General Public Licenses are designed to make sure that you have the freedom to distribute copies of free software (and charge for this service if you wish), that you receive source code or can get it if you want it, that you can change the software or use pieces of it in new free programs; and that you know you can do these things.

To protect your rights, we need to make restrictions that forbid anyone to deny you these rights or to ask you to surrender the rights. These restrictions translate to certain responsibilities for you if you distribute copies of the software, or if you modify it.

For example, if you distribute copies of such a program, whether gratis or for a fee, you must give the recipients all the rights that you have.

You must make sure that they, too, receive or can get the source code. And you must show them these terms so they know their rights. We protect your rights with two steps:

(1)copyright the software, and (2)offer you this license which gives you legal permission to copy, distribute and/or modify the software. Also, for each author's protection and ours, we want to make certain that everyone understands that there is no warranty for this free software. If the software is modified by someone else and passed on, we want its recipients to know that what they have is not the original, so that any problems introduced by others will not reflect on the original authors' reputations.

Finally, any free program is threatened constantly by software patents. We wish to avoid the danger that redistributors of a free program will individually obtain patent licenses, in effect making the program proprietary. To prevent this, we have made it clear that any patent must be licensed for everyone's free use or not licensed at all. The precise terms and conditions for copying, distribution and modification follow.

TERMS AND CONDITIONS FOR COPYING, DISTRIBUTION AND MODIFICATION

Version 2, June 1991 Copyright (C) 1989, 1991 Free Software Foundation, Inc. 51 Franklin S

  1. This License applies to any program or other work which contains a notice placed by the copyright holder saying it may be distributed under the terms of this General Public License.

The “Program”, below, refers to any such program or work, and a “work based on the Program” means either the Program or any derivative work under copyright law: that is to say, a work containing the Program or a portion of it, either verbatim or with modifications and/or translated into another language. (Hereinafter, translation is included without limitation in the term “modification”.) Each licensee is addressed as “you”.

Activities other than copying, distribution and modification are not covered by this License; they are outside its scope. The act of running the Program is not restricted, and the output from the Program is covered only if its contents constitute a work based on the Program (independent of having been made by running the Program). Whether that is true depends on what the Program does.

  1. You may copy and distribute verbatim copies of the Program's source code as you receive it, in any medium, provided that you conspicuously and appropriately publish on each copy an appropriate copyright notice and disclaimer of warranty; keep intact all the notices that refer to this License and to the absence of any warranty; and give any other recipients of the Program a copy of this License along with the Program.

You may charge a fee for the physical act of transferring a copy, and you may at your option offer warranty protection in exchange for a fee.

  1. You may modify your copy or copies of the Program or any portion of it, thus forming a work based on the Program, and copy and distribute such modifications or work under the terms of Section 1 above, provided that you also meet all of these conditions:

a) You must cause the modified files to carry prominent notices stating that you changed the files and the date of any change.

b) You must cause any work that you distribute or publish, that in whole or in part contains or is derived from the Program or any part thereof, to be licensed as a whole at no charge to all third parties under the terms of this License.

c) If the modified program normally reads commands interactively when run, you must cause it, when started running for such interactive use in the most ordinary way, to print or display an announcement including an appropriate copyright notice and a notice that there is no warranty (or else, saying that you provide a warranty) and that users may redistribute the program under these conditions, and telling the user how to view a copy of this License. (Exception: if the Program itself is interactive but does not normally print such an announcement, your work based on the Program is not required to print an announcement.)

These requirements apply to the modified work as a whole. If identifiable sections of that work are not derived from the Program, and can be reasonably considered independent and separate works in themselves, then this License, and its terms, do not apply to those sections when you distribute them as separate works. But when you distribute the same sections as part of a whole which is a work based on the Program, the distribution of the whole must be on the terms of this License, whose permissions for other licensees extend to the entire whole, and thus to each and every part regardless of who wrote it.

Thus, it is not the intent of this section to claim rights or contest your rights to work written entirely by you; rather, the intent is to exercise the right to control the distribution of derivative or collective works based on the Program. In addition, mere aggregation of another work not based on the Program with the Program (or with a work based on the Program) on a volume of a storage or distribution medium does not bring the other work under the scope of this License.

  1. You may copy and distribute the Program (or a work based on it, under Section 2) in object code or executable form under the terms of Sections 1 and 2 above provided that you also do one of the following :

a) Accompany it with the complete corresponding machine-readable source code, which must be distributed under the terms of Sections 1 and 2 above on a medium customarily used for software interchange ; or, b) Accompany it with a written offer, valid for at least three years, to give any third party, for a charge no more than your cost of physically performing source distribution, a complete machinereadable copy of the corresponding source code, to be distributed under the terms of Sections 1 and 2 above on a medium customarily used for software interchange ; or,

c) Accompany it with the information you received as to the offer to distribute corresponding source code. (This alternative is allowed only for noncommercial distribution and only if you received the program in object code or executable form with such an offer, in accord with Subsection b above.) The source code for a work means the preferred form of the work for making modifications to it. For an executable work, complete source code means all the source code for all modules it contains, plus any associated interface definition files, plus the scripts used to control compilation and installation of the executable. However, as a special exception, the source code distributed need not include anything that is normally distributed (in either source or binary form) with the major components (compiler, kernel, and so on) of the operating system on which the executable runs, unless that component itself accompanies the executable. If distribution of executable or object code is made by offering access to copy from a designated place, then offering equivalent access to copy the source code from the same place counts as distribution of the source code, even though third parties are not compelled to copy the source along with the object code.

  1. You may not copy, modify, sublicense, or distribute the Program except as expressly provided under this License. Any attempt otherwise to copy, modify, sublicense or distribute the Program is void, and will automatically terminate your rights under this License.

However, parties who have received copies, or rights, from you under this License will not have their licenses terminated so long as such parties remain in full compliance.

  1. You are not required to accept this License, since you have not signed it. However, nothing else grants you permission to modify or distribute the Program or its derivative works.

These actions are prohibited by law if you do not accept this License. Therefore, by modifying or distributing the Program (or any work based on the Program), you indicate your acceptance of this License to do so, and all its terms and conditions for copying, distributing or modifying the Program or works based on it.

  1. Each time you redistribute the Program (or any work based on the Program), the recipient automatically receives a license from the original licensor to copy, distribute or modify the Program subject to these terms and conditions. You may not impose any further restrictions on the recipients' exercise of the rights granted herein. You are not responsible for enforcing compliance by third parties to this License.

  2. If, as a consequence of a court judgment or allegation of patent infringement or for any other reason (not limited to patent issues), conditions are imposed on you (whether by court order, agreement or otherwise) that contradict the conditions of this License, they do not excuse you from the conditions of this License. If you cannot distribute so as to satisfy simultaneously your obligations under this License and any other pertinent obligations, then as a consequence you may not distribute the Program at all.

For example, if a patent license would not permit royalty-free redistribution of the Program by all those who receive copies directly or indirectly through you, then the only way you could satisfy both it and this License would be to refrain entirely from distribution of the Program.

If any portion of this section is held invalid or unenforceable under any particular circumstance, the balance of the section is intended to apply and the section as a whole is intended to apply in other circumstances. It is not the purpose of this section to induce you to infringe any patents or other property right claims or to contest validity of any such claims; this section has the sole purpose of protecting the integrity of the free software distribution system, which is implemented by public license practices. Many people have made generous contributions to the wide range of software distributed through that system in reliance on consistent application of that system; it is up to the author/donor to decide if he or she is willing to distribute software through any other system and a licensee cannot impose that choice. This section is intended to make thoroughly clear what is believed to be a consequence of the rest of this License.

  1. If the distribution and/or use of the Program is restricted in certain countries either by patents or by copyrighted interfaces, the original copyright holder who places the Program under this License may add an explicit geographical distribution limitation excluding those countries, so that distribution is permitted only in or among countries not thus excluded. In such case, this License incorporates the limitation as if written in the body of this License.

  2. The Free Software Foundation may publish revised and/or new versions of the General Public License from time to time. Such new versions will be similar in spirit to the present version, but may differ in detail to address new problems or concerns. Each version is given a distinguishing version number. If the Program specifies a version number of this License which applies to it and "any later version", you have the option of following the terms and conditions either of that version or of any later version published by the Free Software Foundation. If the Program does not specify a version number of this License, you may choose any version ever published by the Free Software Foundation.

  3. If you wish to incorporate parts of the Program into other free programs whose distribution conditions are different, write to the author to ask for permission. For software which is copyrighted by the Free Software Foundation, write to the Free Software Foundation; we sometimes make exceptions for this. Our decision will be guided by the two goals of preserving the free status of all derivatives of our free software and of promoting the sharing and reuse of software generally.

nO WarrantY

  1. BECAUSE THE PROGRAM IS LICENSED FREE OF CHARGE, THERE IS NO WARRANTY FOR THE PROGRAM, TO THE EXTENT PERMITTED BY APPLICABLE LAW. EXCEPT WHEN OTHERWISE STATED IN WRITING THE COPYRIGHT HOLDERS AND/OR OTHER PARTIES PROVIDE THE PROGRAM "ASIS" WITHOUT WARRANTY OF ANY KIND, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. THE ENTIRE RISK AS TO THE QUALITY AND PERFORMANCE OF THE PROGRAM IS WITH YOU. SHOULD THE PROGRAMPROVE DEFECTIVE, YOU ASSUME THE COST OF ALL NECESSARY SERVICING, REPAIR OR CORRECTION.

  2. IN NO EVENT UNLESS REQUIRED BY APPLICABLE LAW OR AGREED TO IN WRITING WILL ANY COPYRIGHT HOLDER, OR ANY OTHER PARTY WHO MAY MODIFY AND/OR REDISTRIBUTE DAMAGES, INCLUDING ANY GENERAL, SPECIAL, INCIDENTAL OR CONSEQUENTIAL DAMAGES ARISING OUT OF THE USE OR INABILITY TO USE THE PROGRAM (INCLUDING BUT NOT LIMITED TO LOSS OF DATA OR DATA BEING RENDERED INACCURATE OR LOSSES SUSTAINED BY YOU OR THIRD PARTIES OR A FAILURE OF THE PROGRAM TO OPERATE WITH ANY OTHER PROGRAMS), EVEN IF SUCH HOLDER OR OTHER PARTY HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES.

END OF TERMS AND CONDITIONS

How to Apply These Terms to Your New Programs If you develop a new program, and you want it to be of the greatest possible use to the public, the best way to achieve this is to make it free software which everyone can redistribute and change under these terms. To do so, attach the following notices to the program. It is safest to attach them to the start of each source file to most effectively convey the exclusion of warranty; and each file should have at least the “copyright” line and a pointer to where the full notice is found.one line to give the program’s name and an idea of what it does.

This program is free software ; you can redistribute it and/or modify it under the terms of the GNU General Public License as published by the Free Software Foundation ; either version 2 of the License, or (at your option)any later version.

This program is distributed in the hope that it will be useful, but WITHOUT ANY WARRANTY; without even the implied warranty of MERCHANTABILITY or FITNESS FOR A PARTICULAR PURPOSE. See the GNU General Public License for more details.

You should have received a copy of the GNU General Public License along with this program; if not, write to the Free Software Foundation, Inc.,51 Franklin Street, Fifth Floor, Boston, MA 02110-1301, USA. Also add information on how to contact you by electronic and paper mail. If the program is interactive, make it output a short notice like this when it starts in an interactive mode:

Gnomovision version 69, Copyright (C) year name of author Gnomovision comes with ABSOLUTELY NO WARRANTY; for details type 'show w'. This is free software, and you are welcome to redistribute it under certain conditions; type 'show c' for details.

The hypothetical commands 'show w' and 'show c' should show the appropriate parts of the General Public License. Of course, the commands you use may be called something other than 'show w' and 'show c'; they could even be mouse-clicks or menu items-- whatever suits your program.

You should also get your employer (if you work as a programmer) or your school, if any, to sign a "copyright disclaimer" for the program, if necessary. Here is a sample; alter the names:

Yoyodyne, Inc., hereby disclaims all copyright interest in the program ‘Gnomovision’ (which makes passes at compilers) written by James Hacker. signature of Ty Coon, 1 April 1989 Ty Coon, President of Vice This General Public License does not permit incorporating your program into proprietary programs. If your program is a subroutine library, you may consider it more useful to permit linking proprietary applications with the library. If this is Lwihcaetn ysoeu want to do, use the GNU Lesser General Public instead of this License.

Gnu GeneraL puBLic License

Version 3, 29 June 2007

Copyright (C) 2007 Free Software Foundation, Inc. http://fsf.org/

Everyone is permitted to copy and distribute verbatim copies of this license document, but changing it is not allowed.

Preamble

The GNU General Public License is a free, copyleft license for software and other kinds of works. The licenses for most software and other practical works are designed to take away your freedom to share and change the works. By contrast, the GNU General Public License is intended to guarantee your freedom to share and change all versions of a program--to make sure it remains free software for all its users.

We, the Free Software Foundation, use the GNU General Public License for most of our software; it applies also to any other work released this way by its authors.

You can apply it to your programs, too. When we speak of free software, we are referring to freedom, not price. Our General Public Licenses are designed to make sure that you have the freedom to distribute copies of free software (and charge for them if you wish), that you receive source code or can get it if you want it, that you can change the software or use pieces of it in new free programs, and that you know you can do these things.

To protect your rights, we need to prevent others from denying you these rights or asking you to surrender the rights. Therefore, you have certain responsibilities if you distribute copies of the software, or if you modify it: responsibilities to respect the freedom of others. For example, if you distribute copies of such a program, whether gratis or for a fee, you must pass on to the recipients the same freedoms that you received. You must make sure that they, too, receive or can get the source code. And you must show them these terms so they know their rights. Developers that use the GNU GPL protect your rights with two steps: (1) assert copyright on the software, and (2) offer you this License giving you legal permission to copy, distribute and/or modify it. For the developers' and authors' protection, the GPL clearly explains that there is no arranty for this free software. For both users' and authors' sake, the GPL requires that modified versions be marked as changed, so that their problems will not be attributed erroneously to authors of previous versions. Some devices are designed to deny users access to install or run modified versions of the software inside them, although the manufacturer can do so. This is fundamentally incompatible with the aim of protecting users' freedom to change the software. The systematic pattern of such abuse occurs in the area of products for individuals to use, which is precisely where it is most unacceptable. Therefore, we have designed this version of the GPL to prohibit the practice for those products. If such problems arise substantially in other domains, we stand ready to extend this provision to those domains in future versions of the GPL, as needed to protect the freedom of users.

Finally, every program is threatened constantly by software patents. States should not allow patents to restrict development and use of software on general-purpose computers, but in those that do, we wish to avoid the special anger that patents applied to a free program could make it effectively proprietary. To prevent this, the GPL assures that atents cannot be used to render the program non-free. he precise terms and conditions for copying, distribution and modification follow.

TERMS AND CONDITIONS

0. Definitions.

"This License" refers to version 3 of the GNU General Public License.

Copyright" also means copyright-like laws that apply to other kinds of works, such as semiconductor masks.

"The Program" refers to any copyrightable work licensed under this License. Each licensee is addressed as "you".

"Licensees" and "recipients" may be individuals or organizations.

To “modify” a work means to copy from or adapt all or part of the work in a fashion requiring copyright permission, other than the making of an exact copy. The resulting work is called a “modified version” of the earlier work or a work “based on” the earlier work.

A “covered work” means either the unmodified Program or a work based on the Program.

To “propagate” a work means to do anything with it that, without permission, would make you directly or secondarily liable for infringement under applicable copyright law, except executing it on a computer or modifying a private copy.

Propagation includes copying, distribution (with or without modification), making available to the public, and in some countries other activities as well.

To “convey” a work means any kind of propagation that enables other parties to make or receive copies. Mere interaction with a user through a computer network, with no transfer of a copy, is not conveying. An interactive user interface displays “Appropriate Legal Notices” to the extent that it includes a convenient and prominently visible feature that (1) displays an appropriate copyright notice, and (2) tells the user that there is no warranty for the work (except to the extent that warranties are provided), that licensees may convey the work under this License, and how to view a copy of this License. If the interface presents a list of user commands or options, such as a menu, a prominent item in the list meets this criterion.

1. Source Code.

The “source code” for a work means the preferred form of the work for making modifications to it. “Object code” means any non-source form of a work.

A “Standard Interface” means an interface that either is an official standard defined by a recognized standards body, or, in the case of interfaces specified for a particular programming language, one that is widely used among developers working in that language.

The “System Libraries” of an executable work include anything, other than the work as a whole, that (a) is included in the normal form of packaging a Major Component, but which is not part of that Major Component, and (b) serves only to enable use of the work with that Major Component, or to implement a Standard Interface for which an implementation is available to the public in source code form. A “Major Component”, in this context, means a major essential component (kernel, window system, and so on) of the specific operating system (if any) on which the executable work runs, or a compiler used to produce the work, or an object code interpreter used to run it.

The "Corresponding Source" for a work in object code form means all the source code needed to generate, install, and (for an executable work) run the object code and to modify the work, including scripts to control those activities.

However, it does not include the work's System Libraries, or general purpose tools or generally available free programs which are used unmodified in performing those activities but which are not part of the work. For example, Corresponding Source includes interface definition files associated with source files for the work, and the source code for shared libraries and dynamically linked subprograms that the work is specifically designed to require, such as by intimate data communication or control flow between those subprograms and other parts of the work.

The Corresponding Source need not include anything that users can regenerate automatically from other parts of the Corresponding Source. The Corresponding Source for a work in source code form is that same work.

2. Basic Permissions.

All rights granted under this License are granted for the term of copyright on the Program, and are irrevocable provided the stated conditions are met. This License explicitly affirms your unlimited permission to run the unmodified Program. The output from running a covered work is covered by this License only if the output, given its content, constitutes a covered work. This License acknowledges your rights of fair use or other equivalent, as provided by copyright law.

You may make, run and propagate covered works that you do not convey, without conditions so long as your license otherwise remains in force. You may convey covered works to others for the sole purpose of having them make modifications exclusively for you, or provide you with facilities for running those works, provided that you comply with the terms of this License in conveying all material for which you do not control copyright. Those thus making or running the covered works for you must do so exclusively on your behalf, under your direction and control, on terms that prohibit them from making any copies of your copyrighted material outside their relationship with you. Conveying under any other circumstances is permitted solely under the conditions stated below.

Sublicensing is not allowed; section 10 makes it unnecessary.

No covered work shall be deemed part of an effective technological measure under any applicable law fulfilling obligations under article 11 of the WIPO copyright treaty adopted on 20 December 1996, or similar laws prohibiting or restricting circumvention of such measures.

When you convey a covered work, you waive any legal power to forbid circumvention of technological measures to the extent such circumvention is effected by exercising rights under this License with respect to the covered work, and you disclaim any intention to limit operation or modification of the work as a means of enforcing, against the work's users, your or third parties' legal rights to forbid circumvention of technological measures.

4. Conveying Verbatim Copies.

You may convey verbatim copies of the Program's source code as you receive it, in any medium, provided that you conspicuously and appropriately publish on each copy an appropriate copyright notice; keep intact all notices stating that this License and any non-permissive terms added in accord with section 7 apply to the code; keep intact all notices of the absence of any warranty; and give all recipients a copy of this License along with the Program. You may charge any price or no price for each copy that you convey, and you may offer support or warranty protection for a fee.

5. Conveying Modified Source Versions.

You may convey a work based on the Program, or the modifications to produce it from the Program, in the form of source code under the terms of section 4, provided that you also meet all of these conditions:

a) The work must carry prominent notices stating that you modified it, and giving a relevant date.
b) The work must carry prominent notices stating that it is released under this License and any conditions added under section 7. This requirement modifies the requirement in section 4 to “keep intact all notices”.
c) You must license the entire work, as a whole, under this License to anyone who comes into possession of a copy. This License will therefore apply, along with any applicable section 7 additional terms, to the whole of the work, and all its parts, regardless of how they are packaged. This License gives no permission to license the work in any other way, but it does not invalidate such permission if you have separately received it.
d) If the work has interactive user interfaces, each must display Appropriate Legal Notices; however, if the Program has interactive interfaces that do not display Appropriate Legal Notices, your work need not make them do so. A compilation of a covered work with other separate and independent works, which are not by their nature extensions of the covered work, and which are not combined with it such as to form a larger program, in or on a volume of a storage or distribution medium, is called an “aggregate” if the compilation and its resulting copyright are not used to limit the access or legal rights of the compilation’s users beyond what the individual works permit. Inclusion of a covered work in an aggregate does not cause this License to apply to the other parts of the aggregate.

6. Conveying Non-Source Forms.

You may convey a covered work in object code form under the terms of sections 4 and 5, provided that you also convey the machine-readable Corresponding Source under the terms of this License, in one of these ways:

a) Convey the object code in, or embodied in, a physical product (including a physical distribution medium), accompanied by the Corresponding Source fixed on a durable physical medium customarily used for software interchange.
b) Convey the object code in, or embodied in, a physical product (including a physical distribution medium), accompanied by a written offer, valid for at least three years and valid for as long as you offer spare parts or customer support for that product model, to give anyone who possesses the object code either (1) a copy of the Corresponding Source for all the software in the product that is covered by this License, on a durable physical medium customarily used for software interchange, for a price no more than your reasonable cost of physically performing this conveying of source, or (2) access to copy the Corresponding Source from a network server at no charge.
c) Convey individual copies of the object code with a copy of the written offer to provide the corresponding Source. This alternative is allowed only occasionally and noncommercially, and only if you received the object code with such an offer, in accord with subsection 6b.

d) Convey the object code by offering access from a designated place (gratis or for a charge), and offer equivalent access to the Corresponding Source in the same way through the same place at no further charge. You need not require recipients to copy the Corresponding Source along with the object code. If the place to copy the object code is a network server, the Corresponding Source may be on a different server (operated by you or a third party) that supports equivalent copying facilities, provided you maintain clear directions next to the object code saying where to find the Corresponding Source. Regardless of what server hosts the Corresponding Source, you remain obligated to ensure that it is available for as long as needed to satisfy these requirements.

e) Convey the object code using peer-to-peer transmission, provided you inform other peers where the object code and Corresponding Source of the work are being offered to the general public at no charge under subsection 6d. A separable portion of the object code, whose source code is excluded from the Corresponding Source as a System Library, need not be included in conveying the object code work. A "User Product" is either (1) a "consumer product", which means any tangible personal property which is normally used for personal, family, or household purposes, or (2) anything designed or sold for incorporation into a dwelling. In determining whether a product is a consumer product, doubtful cases shall be resolved in favor of coverage. For a particular product received by a particular user, "normally used" refers to a typical or common use of that class of product, regardless of the status of the particular user or of the way in which the particular user actually uses, or expects or is expected to use, the product. A product is a consumer product regardless of whether the product has substantial commercial, industrial or non-consumer uses, unless such uses represent the only significant mode of use of the product.

"Installation Information" for a User Product means any methods, procedures, authorization keys, or other information required to install and execute modified versions of a covered work in that User Product from a modified version of its Corresponding Source. The information must suffice to ensure that the continued functioning of the modified object code is in no case prevented or interfered with solely because modification has been made. If you convey an object code work under this section in, or with, or specifically for use in, a User Product, and the conveying occurs as part of a transaction in which the right of possession and use of the User Product is transferred to the recipient in perpetuity or for a fixed term (regardless of how the transaction is characterized), the Corresponding Source conveyed under this section must be accompanied by the Installation Information. But this requirement does not apply if neither you nor any third party retains the ability to install modified object code on the User Product (for example, the work has been installed in ROM).

The requirement to provide Installation Information does not include a requirement to continue to provide support service, warranty, or updates for a work that has been modified or installed by the recipient, or for the User Product in which it has been modified or installed. Access to a network may be denied when the modification itself materially and adversely affects the operation of the network or violates the rules and protocols for communication across the network. Corresponding Source conveyed, and Installation Information provided, in accord with this section must be in a format that is publicly documented (and with an implementation available to the public in source code form), and must require no special password or key for unpacking, reading or copying.

7. Additional Terms.

“Additional permissions” are terms that supplement the terms of this License by making exceptions from one or more of its conditions. Additional permissions that are applicable to the entire Program shall be treated as though they were included in this License, to the extent that they are valid under applicable law. If additional permissions apply only to part of the Program, that part may be used separately under those permissions, but the entire Program remains governed by this License without regard to the additional permissions. When you convey a copy of a covered work, you may at your option remove any additional permissions from that copy, or from any part of it. (Additional permissions may be written to require their own removal in certain cases when you modify the work.) You may place additional permissions on material, added by you to a covered work, for which you have or can give appropriate copyright permission. Notwithstanding any other provision of this License, for material you add to a covered work, you may (if authorized by the copyright holders of that material) supplement the terms of this License with terms:

a) Disclaiming warranty or limiting liability differently from the terms of sections 15 and 16 of this License; or
b) Requiring preservation of specified reasonable legal notices or author attributions in that material or in the Appropriate Legal Notices displayed by works containing it; or
c) Prohibiting misrepresentation of the origin of that material, or requiring that modified versions of such material be marked in reasonable ways as different from the original version; or
d) Limiting the use for publicity purposes of names of licensors or authors of the material; or
e) Declining to grant rights under trademark law for use of some trade names, trademarks, or service marks; or
f) Requiring indemnification of licensors and authors of that material by anyone who conveys the material (or modified versions of it) with contractual assumptions of liability to the recipient, for any liability that these contractual assumptions directly impose on those licensors and authors. All other non-permissive additional terms are considered "further restrictions" within the meaning of section 10. If the Program as you received it, or any part of it, contains a notice stating that it is governed by this License along with a term that is a further restriction, you may remove that term. If a license document contains a further restriction but permits relicensing or conveying under this License, you may add to a covered work material governed by the terms of that license document, provided that the further restriction does not survive such relicensing or conveying. If you add terms to a covered work in accord with this section, you must place, in the relevant source files, a statement of the additional terms that apply to those files, or a notice indicating where to find the applicable terms. Additional terms, permissive or non-permissive, may be stated in the form of a separately written license, or stated as exceptions; the above requirements apply either way.

8. Termination.

You may not propagate or modify a covered work except as expressly provided under this License. Any attempt otherwise to propagate or modify it is void, and will automatically terminate your rights under this License (including any patent licenses granted under the third paragraph of section 11).

However, if you cease all violation of this License, then your license from a particular copyright holder is reinstated (a) provisionally, unless and until the copyright holder explicitly and finally terminates your license, and (b) permanently, if the copyright holder fails to notify you of the violation by some reasonable means prior to 60 days after the cessation. Moreover, your license from a particular copyright holder is reinstated permanently if the copyright holder notifies you of the violation by some reasonable means, this is the first time you have received notice of violation of this License (for any work) from that copyright holder, and you cure the violation prior to 30 days after your receipt of the notice. Termination of your rights under this section does not terminate the licenses of parties who have received copies or rights from you under this License. If your rights have been terminated and not permanently reinstated, you do not qualify to receive new licenses for the same material under section 10.

9. Acceptance Not Required for Having Copies.

You are not required to accept this License in order to receive or run a copy of the Program. Ancillary propagation of a covered work occurring solely as a consequence of using peer-to-peer transmission to receive a copy likewise does not require acceptance. However, nothing other than this License grants you permission to propagate or modify any covered work. These actions infringe copyright if you do not accept this License. Therefore, by modifying or propagating a covered work, you indicate your acceptance of this License to do so.

10. Automatic Licensing of Downstream Recipients.

Each time you convey a covered work, the recipient automatically receives a license from the original licensors, to run, modify and propagate that work, subject to this License. You are not responsible for enforcing compliance by third parties with this License. An “entity transaction” is a transaction transferring control of an organization, or substantially all assets of one, or subdividing an organization, or merging organizations. If propagation of a covered work results from an entity transaction, each party to that transaction who receives a copy of the work also receives whatever licenses to the work the party’s predecessor in interest had or could give under the previous paragraph, plus a right to possession of the Corresponding Source of the work from the predecessor in interest, if the predecessor has it or can get it with reasonable efforts. You may not impose any further restrictions on the exercise of the rights granted or affirmed under this License. For example, you may not impose a license fee, royalty, or other charge for exercise of rights granted under this License, and you may not initiate litigation (including a cross-claim or counterclaim in a lawsuit) alleging that any patent claim is infringed by making, using, selling, offering for sale, or importing the Program or any portion of it.

11. Patents.

A “contributor” is a copyright holder who authorizes use under this License of the Program or a work on which the Program is based. The work thus licensed is called the contributor’s “contributor version”. A contributor’s “essential patent claims” are all patent claims owned or controlled by the contributor, whether already acquired or hereafter acquired, that would be infringed by some manner, permitted by this License, of making, using, or selling its contributor version, but do not include claims that would be infringed only as a consequence of further modification of the contributor version. For purposes of this definition, “control” includes the right to grant patent sublicenses in a manner consistent with the requirements of this License. Each contributor grants you a non-exclusive, worldwide, royaltyfree patent license under the contributor’s essential patent claims, to make, use, sell, offer for sale, import and otherwise run, modify and propagate the contents of its contributor version.

In the following three paragraphs, a “patent license” is any express agreement or commitment, however denominated, not to enforce a patent (such as an express permission to practice a patent or covenant not to sue for patent infringement). To “grant” such a patent license to a party means to make such an agreement or commitment not to enforce a patent against the party. If you convey a covered work, knowingly relying on a patent license, and the Corresponding Source of the work is not available for anyone to copy, free of charge and under the terms of this License, through a publicly available network server or other readily accessible means, then you must either (1) cause the Corresponding Source to be so available, or (2) arrange to deprive yourself of the benefit of the patent license for this particular work, or (3) arrange, in a manner consistent with the requirements of this License, to extend the patent license to downstream recipients. “Knowingly relying” means you have actual knowledge that, but for the patent license, your conveying the covered work in a country, or your recipient’s use of the covered work in a country, would infringe one or more identifiable patents in that country that you have reason to believe are valid. If, pursuant to or in connection with a single transaction or arrangement, you convey, or propagate by procuring conveyance of, a covered work, and grant a patent license to some of the parties receiving the covered work authorizing them to use, propagate, modify or convey a specific copy of the covered work, then the patent license you grant is automatically extended to all recipients of the covered work and works based on it. A patent license is “discriminatory” if it does not include within the scope of its coverage, prohibits the exercise of, or is conditioned on the non-exercise of one or more of the rights that are specifically granted under this License. You may not convey a covered work if you are a party to an arrangement with a third party that is in the business of distributing software, under which you make payment to the third party based on the extent of your activity of conveying the work, and under which the third party grants, to any of the parties who would receive the covered work from you, a discriminatory patent license

(a) in connection with copies of the covered work conveyed by you (or copies made from those copies), or
(b) primarily for and in connection with specific products or compilations that contain the covered work, unless you entered into that arrangement, or that patent license was granted, prior to 28 March 2007. Nothing in this License shall be construed as excluding or limiting any implied license or other defenses to infringement that may otherwise be available to you under applicable patent law.

12. No Surrender of Others' Freedom.

If conditions are imposed on you (whether by court order, agreement or otherwise) that contradict the conditions of this License, they do not excuse you from the conditions of this License. If you cannot convey a covered work so as to satisfy simultaneously your obligations under this License and any other pertinent obligations, then as a consequence you may not convey it at all. For example, if you agree to terms that obligate you to collect a royalty for further conveying from those to whom you convey the Program, the only way you could satisfy both those terms and this License would be to refrain entirely from conveying the Program.

13. Use with the GNU Affero General Public License.

Notwithstanding any other provision of this License, you have permission to link or combine any covered work with a work licensed under version 3 of the GNU Affero General Public License into a single combined work, and to convey the resulting work. The terms of this License will continue to apply to the part which is the covered work, but the special requirements of the GNU Affero General Public License, section 13, concerning interaction through a network will apply to the combination as such.

14. Revised Versions of this License.

The Free Software Foundation may publish revised and/or new versions of the GNU General Public License from time to time. Such new versions will be similar in spirit to the present version, but may differ in detail to address new problems or concerns.

Each version is given a distinguishing version number. If the Program specifies that a certain numbered version of the GNU General Public License “or any later version” applies to it, you have the option of following the terms and conditions either of that numbered version or of any later version published by the Free Software Foundation. If the Program does not specify a version number of the GNU General Public License, you may choose any version ever published by the Free Software Foundation. If the Program specifies that a proxy can decide which future versions of the GNU General Public License can be used, that proxy’s public statement of acceptance of a version permanently authorizes you to choose that version for the Program. Later license versions may give you additional or different permissions. However, no additional obligations are imposed on any author or copyright holder as a result of your choosing to follow a later version.

15. Disclaimer of Warranty.

THERE IS NO WARRANTY FOR THE PROGRAM, TO THE EXTENT PERMITTED BY APPLICABLE LAW. EXCEPT WHEN OTHERWISE STATED IN WRITING THE COPYRIGHT HOLDERS AND/OR OTHER PARTIES PROVIDE THE PROGRAM "AS IS" WITHOUT WARRANTY OF ANY KIND, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. THE ENTIRE RISK AS TO THE QUALITY AND PERFORMANCE OF THE PROGRAM IS WITH YOU. SHOULD THE PROGRAM PROVE DEFECTIVE, YOU ASSUME THE COST OF ALL NECESSARY SERVICING, REPAIR OR CORRECTION.

16. Limitation of Liability.

IN NO EVENT UNLESS REQUIRED BY APPLICABLE LAW OR AGREED TO IN WRITING WILL ANY COPYRIGHT HOLDER, OR ANY OTHER PARTY WHO MODIFIES AND/OR CONVEYS THE PROGRAM AS PERMITTED ABOVE, BE LIABLE TO YOU FOR DAMAGES, INCLUDING ANY GENERAL, SPECIAL, INCIDENTAL OR CONSEQUENTIAL DAMAGES ARISING OUT OF THE USE OR INABILITY TO USE THE PROGRAM (INCLUDING BUT NOT LIMITED TO LOSS OF DATA OR DATA BEING RENDERED INACCURATE OR LOSSES SUSTAINED BY YOU OR THIRD PARTIES OR A FAILURE OF THE PROGRAM TO OPERATE WITH ANY OTHER PROGRAMS), EVEN IF SUCH HOLDER OR OTHER PARTY HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES.

17. Interpretation of Sections 15 and 16.

If the disclaimer of warranty and limitation of liability provided above cannot be given local legal effect according to their terms, reviewing courts shall apply local law that most closely approximates an absolute waiver of all civil liability in connection with the Program, unless a warranty or assumption of liability accompanies a copy of the Program in return for a fee.

The OpenSSL toolkit stays under a dual license, i.e. both the conditions of the OpenSSL License and the original SSLeay license apply to the toolkit.

See below for the actual license texts. Actually both licenses are BSD-style Open Source licenses. In case of any license issues related to OpenSSL please contact openssl-core@openssl.org.

Component Name License URL

openssl-1.0.1g OpenSSL Combined License http://www.openssl.org/source

Copyright (c) 1998-2011 The OpenSSL Project. All rights reserved.

Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met:

  1. Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer.
  2. Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution.
  3. All advertising materials mentioning features or use of this software must display the following acknowledgment: "This product includes software developed by the OpenSSL Project for use in the OpenSSL Toolkit. (http://www.openssl.org/)
  4. The names "OpenSSL Toolkit" and "OpenSSL Project" must not be used to endorse or promote products derived from this software without prior written permission. For written permission, please contact openssl-core@openssl.org.
  5. Products derived from this software may not be called "OpenSSL" nor may "OpenSSL" appear in their names without prior written permission of the OpenSSL Project.
  6. Redistributions of any form whatsoever must retain the following acknowledgment: "This product includes software developed by the OpenSSL Project for use in the OpenSSL Toolkit (http://www.openssl.org/)"

THIS SOFTWARE IS PROVIDED BY THE OpenSSL PROJECT "AS IS" AND ANY EXPRESSED OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE OpenSSL PROJECT OR ITS CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

This product includes cryptographic software written by Eric Young(eay@cryptsoft.com). This product includes software written by Tim Hudson (tjh@cryptsoft.com).

Original SSLeay License

Copyright (C) 1995-1998 Eric Young (eay@cryptsoft.com) All rights reserved.

This package is an SSL implementation written by Eric Young (eay@cryptsoft.com).

The implementation was written so as to conform with Netscapes SSL.

This library is free for commercial and non-commercial use as long as the following conditions are aheared to. The following conditions apply to all code found in this distribution, be it the RC4, RSA, Ihash, DES, etc., code; not just the SSL code. The SSL documentation included with this distribution is covered by the same copyright terms except that the holder is Tim Hudson (tjh@cryptsoft.com).

Copyright remains Eric Young's, and as such any Copyright notices in the code are not to be removed. If this package is used in a product, Eric Young should be given attribution as the author of the parts of the library used. This can be in the form of a textual message at program startup or in documentation (online or textual) provided with the package. Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met:

  1. Redistributions of source code must retain the copyright notice, this list of conditions and the following disclaimer.
  2. Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution.
  3. All advertising materials mentioning features or use of this software must display the following acknowledgement: "This product includes cryptographic software written by Eric Young (eay@cryptsoft.com)" The word 'cryptographic' can be left out if the routines from the library being used are not cryptographic related :-).
  4. If you include any Windows specific code (or a derivative thereof) from the apps directory (application code) you must include an acknowledgement: "This product includes software written by Tim Hudson (tjh@cryptsoft.com)"

THIS SOFTWARE IS PROVIDED BY ERIC YOUNG "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE AUTHOR OR CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

The licence and distribution terms for any publicly available version or derivative of this code cannot be changed. i.e. this code cannot simply be copied and put under another distribution licence [including the GNU Public Licence.]

Some software components of this product incorporate source code covered under the BSD license as follows.

Component Name License URL

net-snmp-5.7.1BSDhttp://www.net-snmp.org/about/license.html
pcre-8.20BSD
openssh-5.9p1BSD
libcap-1.2.1BSD 2.0http://www.kernel.org/pub/linux/libs/security/linux-privs/libcap2
lighttpd-1.4.35BSD 2.0http://www.opensource.org/licenses/bsd-license.html
Game-wsBSD 2.0
MiniUPnP Project ClientBSD 2.0
pppd-2.4.5BSD 2.0http://opensource.org/licenses/BSD-3-Clause

lighttpd is a secure, fast, compliant, and very flexible webserver that has been optimized for high-performance environments. It has a very low memory footprint compared to other webservers and takes care of cpuload. Its advanced feature-set (FastCGI, CGI, Auth, Output-Compression, URL-Rewriting and many more) make lighttpd the perfect webserver-software for every server that suffers load problems. Simple Network Management Protocol (SNMP) is an Internetstandard protocol for managing devices on IP networks. It is used mostly in network management systems to monitor the devices attached to the network for conditions that need administrative attention. Net-SNMP is a suite of applications used to implement SNMP v1, SNMP v2c and SNMP v3 using both IPv4 and IPv6. For more additional information, send email to help.cctv@hanwha.com.

Copyright (C) 2004, Kneschke, incremental

All rights reserved.

Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met :

  • Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer.
  • Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution.
  • Neither the name of the ‘incremental’ nor the names of its contributors may be used to endorse or promote products derived from this software without specific prior written permission.

THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND CONTRIBUTORS "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE COPYRIGHT OWNER OR CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

Copyright (c) 1998-2001 University College London

All rights reserved.

Redistribution and use in source and binary forms, with or without modification, is permitted provided that the following conditions are met :

  1. Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer.
  2. Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution.
  3. All advertising materials mentioning features or use of this software must display the following acknowledgement: This product includes software developed by the Computer Science Department at University College London.
  4. Neither the name of the University nor of the Department may be used to endorse or promote products derived from this software without specific prior written permission.

THIS SOFTWARE IS PROVIDED BY THE AUTHORS AND CONTRIBUTORS "AS IS" AND ANY EXPRESSED OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE AUTHORS OR CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

Copyright (c) 1988, 1989, 1990, 1991, 1993, 1994, 1995, 1996 The Regents of the University of California.

All rights reserved.

Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met:

  1. Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer.
  2. Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution.

  3. Neither the name of the Regents of the University of California nor the names of its contributors may be used to endorse or promote products derived from this software without specific prior written permission.

THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND CONTRIBUTORS "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE COPYRIGHT OWNER OR CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

Copyright (c) 2006, Creative Labs Inc

All rights reserved.

Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met:

  1. Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer.
  2. Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution.
  3. Neither the name of the Creative Labs nor the names of its contributors may be used to endorse or promote products derived from this software without specific prior written permission.

THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND CONTRIBUTORS "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE COPYRIGHT OWNER OR CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

Copyright (c) 2005-2012, Thomas BERNARD

All rights reserved.

Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met:

  1. Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer.
  2. Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution.

  3. Neither the name of Thomas BERNARD nor the names of its contributors may be used to endorse or promote products derived from this software without specific prior written permission.

THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND CONTRIBUTORS "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE COPYRIGHT OWNER OR CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

Various copyrights apply to this package, listed in various separate parts below. Please make sure that you read all the parts.

Copyright 1989, 1991, 1992 by Carnegie Mellon University Derivative Work - 1996, 1998-2000

Copyright 1996, 1998-2000 The Regents of the University of California

All Rights Reserved

Permission to use, copy, modify and distribute this software and its documentation for any purpose and without fee is hereby granted, provided that the above copyright notice appears in all copies and that both that copyright notice and this permission notice appear in supporting documentation, and that the name of CMU and The Regents of the University of California not be used in advertising or publicity pertaining to distribution of the software without specific written permission.

CMU AND THE REGENTS OF THE UNIVERSITY OF CALIFORNIA DISCLAIM ALL WARRANTIES WITH REGARD TO THIS SOFTWARE, INCLUDING ALL IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS. IN NO EVENT SHALL CMU OR THE REGENTS OF THE UNIVERSITY OF CALIFORNIA BE LIABLE FOR ANY SPECIAL, INDIRECT OR CONSEQUENTIAL DAMAGES OR ANY DAMAGES WHATSOEVER RESULTING FROM THE LOSS OF USE, DATA OR PROFITS, WHETHER IN AN ACTION OF CONTRACT, NEGLIGENCE OR OTHER TORTIOUS ACTION, ARISING OUT OF OR IN CONNECTION WITH THE USE OR PERFORMANCE OF THIS SOFTWARE.

Copyright (c) 2001-2003, Networks Associates Technology, Inc

All rights reserved.

Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met: yy Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer. yy Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution. yy Neither the name of the Networks Associates Technology, Inc nor the names of its contributors may be used to endorse or promote products derived from this software without specific prior written permission.

THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND CONTRIBUTORS "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE COPYRIGHT HOLDERS OR CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

Portions of this code are copyright (c) 2001-2003, Cambridge Broadband Ltd.

All rights reserved.

Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met: yy Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer. yy Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution. yy The name of Cambridge Broadband Ltd. may not be used to endorse or promote products derived from this software without specific prior written permission.

THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDER "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE COPYRIGHT HOLDER BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

Copyright (c) 2003 Sun Microsystems, Inc., 4150 Network

Circle, Santa Clara, California 95054, U.S.A.

All rights reserved.

Use is subject to license terms below. This distribution may include materials developed by third parties. Sun, Sun Microsystems, the Sun logo and Solaris are trademarks or registered trademarks of Sun Microsystems, Inc. in the U.S. and other countries. Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met: yy Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer. yy Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution. yy Neither the name of the Sun Microsystems, Inc. nor the names of its contributors may be used to endorse or promote products derived from this software without specific prior written permission.

THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND CONTRIBUTORS "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE COPYRIGHT HOLDERS OR CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

Copyright (c) 2003-2009, Sparta, Inc

All rights reserved.

Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met: yy Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer. yy Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution. yy Neither the name of Sparta, Inc nor the names of its contributors may be used to endorse or promote products derived from this software without specific prior written permission.

THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND CONTRIBUTORS "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE COPYRIGHT HOLDERS OR CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

Copyright (c) 2004, Cisco, Inc and Information Network

Center of Beijing University of Posts and Telecommunications.

All rights reserved.

Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met: yy Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer. yy Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution. yy Neither the name of Cisco, Inc, Beijing University of Posts and Telecommunications, nor the names of their contributors may be used to endorse or promote products derived from this software without specific prior written permission.

THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND CONTRIBUTORS "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE COPYRIGHT HOLDERS OR CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

Copyright (c) Fabasoft R&D Software GmbH & Co KG, 2003oss@fabasoft.com

Author: Bernhard Penz

Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met: yy Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer. yy Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution. yy The name of Fabasoft R&D Software GmbH & Co KG or any of its subsidiaries, brand or product names may not be used to endorse or promote products derived from this software without specific prior written permission.

THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDER "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE COPYRIGHT HOLDER BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

Copyright (c) 2007 Apple Inc.

All rights reserved.

Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met:

  1. Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer.
  2. Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution. 3. Neither the name of Apple Inc. ("Apple") nor the names of its contributors may be used to endorse or promote products derived from this software without specific prior written permission.

THIS SOFTWARE IS PROVIDED BY APPLE AND ITS CONTRIBUTORS "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL APPLE OR ITSCONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

Copyright (c) 2009, ScienceLogic, LLC

All rights reserved.

Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met: yy Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer. yy Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution. yy Neither the name of ScienceLogic, LLC nor the names of its contributors may be used to endorse or promote products derived from this software without specific prior written permission.

THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND CONTRIBUTORS "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE COPYRIGHT HOLDERS OR CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE

Some software components of this product incorporate source code covered under the MIT license as follows

MIT License 2.0

- Acewidget, bettermeans, jquery-ui, libxml, libxml2, Mesa3D-MesaLib,mwEmbed,OpenGL Samples Pack, Wide Studio, xorg-server, dropbear-2012.55, ncurses-5.7

Copyright (c) 2011, The Dojo Foundation

Copyright 2010, AUTHORS.txt (http://jqueryui.com/about)

Dual licensed under the MIT or GPL Version 2 licenses.

- http://jquery.org/license

- http://docs.jquery.com/UI/Widget

Copyright Daniel Veillard

Copyright Igor Zlatovic igor@zlatkovic.com

Copyright Aleksey Sanin

Copyright Gary Pennington Gary.Pennington@uk.sun.com

Copyright Alfred Mickautsch alfred@mickautsch.de

Copyright Bjorn Reese bjorn.reese@systematic.dk

Copyright Joel W. Reed

Copyright William Brack wbrack@mmm.com.hk

Copyright (c) 2007-2010 The Khronos Group Inc.

Copyright Atish Kumar Patra

Copyright (c) 2006 Free Software Foundation, Inc.

Permission is hereby granted, free of charge, to any person obtaining a copy of this software and associated documentation files (the "Software"), to deal in the Software without restriction, including without limitation the rights to use, copy, modify, merge, publish, distribute, sublicense, and/or sell copies of the Software, and to permit persons to whom the Software is furnished to do so, subject to the following conditions:

The above copyright notice and this permission notice shall be included in all copies or substantial portions of the Software.

THE SOFTWARE IS PROVIDED "AS IS", WITHOUT WARRANTY OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO THE WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT. IN NO EVENT SHALL THE AUTHORS OR COPYRIGHT HOLDERS BE LIABLE FOR ANY CLAIM, DAMAGES OR OTHER LIABILITY, WHETHER IN AN ACTION OF CONTRACT, TORT OR OTHERWISE, ARISING FROM, OUT OF OR IN CONNECTION WITH THE SOFTWARE OR THE USE OR OTHER DEALINGS IN THE SOFTWARE.

Mozilla Public License

Since we, at Hanwha Techwin, used the Mozilla Firefox component without modifying the source code according to the MOZILLA Public license 1.1, we are not obliged to provide the source code of the corresponding component.

- Version 1.1

1. Definitions.

1.0.1. "Commercial Use" means distribution or otherwise making the Covered Code available to a third party.

1.1. "Contributor" means each entity that creates or contributes to the creation of Modifications.

1.2. "Contributor Version" means the combination of the Original Code, prior Modifications used by a Contributor, and the Modifications made by that particular Contributor.

1.3. "Covered Code" means the Original Code or Modifications or the combination of the Original Code and Modifications, in each case including portions thereof.

1.4. "Electronic Distribution Mechanism" means a mechanism generally accepted in the software development community for the electronic transfer of data.

1.5. "Executable" means Covered Code in any form other than Source Code.

1.6. "Initial Developer" means the individual or entity identified as the Initial Developer in the Source Code notice required by Exhibit A.

1.7. "Larger Work" means a work which combines Covered Code or portions thereof with code not governed by the terms of this License.

1.8. "License" means this document.

1.8.1. "Licensable" means having the right to grant, to the maximum extent possible, whether at the time of the initial grant or subsequently acquired, any and all of the rights conveyed herein.

1.9. "Modifications" means any addition to or deletion from the substance or structure of either the Original Code or any previous Modifications. When Covered Code is released as a series of files, a Modification is:

A. Any addition to or deletion from the contents of a file containing Original Code or previous Modifications.

B. Any new file that contains any part of the Original Code or previous Modifications.

1.10. "Original Code" means Source Code of computer software code which is described in the Source Code notice required by Exhibit A as Original Code, and which, at the time of its release under this License is not already Covered Code governed by this License.

1.10.1. "Patent Claims" means any patent claim(s), now owned or hereafter acquired, including without limitation, method, process, and apparatus claims, in any patent Licensable by grantor.

1.11. "Source Code" means the preferred form of the Covered Code for making modifications to it, including all modules it contains, plus any associated interface definition files, scripts used to control compilation and installation of an Executable, or source code differential comparisons against either the Original Code or another well known, available Covered Code of the Contributor's choice. The Source Code can be in a compressed or archival form, provided the appropriate decompression or de-archiving software is widely available for no charge.

1.12. "You" (or "Your") means an individual or a legal entity exercising rights under, and complying with all of the terms of, this License or a future version of this License issued under Section 6.1. For legal entities, "You" includes any entity which controls, is controlled by, or is under common control with You. For purposes of this definition, "control" means (a) the power, direct or indirect, to cause the direction or management of such entity, whether by contract or otherwise, or (b) ownership of more than fifty percent (50%) of the outstanding shares or beneficial ownership of such entity.

2. Source Code License.

2.1. The Initial Developer Grant. The Initial Developer hereby grants You a world-wide, royalty-free, non-exclusive license, subject to third party intellectual property claims:

(a) under intellectual property rights (other than patent or trademark) Licensable by Initial Developer to use, reproduce, modify, display, perform, sublicense and distribute the Original Code (or portions thereof) with or without Modifications, and/or as part of a Larger Work; and
(b) under Patents Claims infringed by the making, using or selling of Original Code, to make, have made, use, practice, sell, and offer for sale, and/or otherwise dispose of the Original Code (or portions thereof).
(c) the licenses granted in this Section 2.1(a) and (b) are effective on the date Initial Developer first distributes Original Code under the terms of this License.
(d) Notwithstanding Section 2.1(b) above, no patent license is granted: 1) for code that You delete from the Original Code; 2) separate from the Original Code; or 3) for infringements caused by: i) the modification of the Original Code or ii) the combination of the Original Code with other software or devices.

2.2. Contributor Grant. Subject to third party intellectual property claims, each Contributor hereby grants You a world-wide, royalty-free, non-exclusive license

(a) under intellectual property rights (other than patent or trademark) Licensable by Contributor, to use, reproduce, modify, display, perform, sublicense and distribute the Modifications created by such Contributor (or portions thereof) either on an unmodified basis, with other Modifications, as Covered Code and/or as part of a Larger Work; and
(b) under Patent Claims infringed by the making, using, or selling of Modifications made by that Contributor either alone and/or in combination with its Contributor Version (or portions of such combination), to make, use, sell, offer for sale, have made, and/or otherwise dispose of: 1) Modifications made by that Contributor (or portions thereof); and 2) the combination of Modifications made by that Contributor with its Contributor Version (or portions of such combination).
(c) the licenses granted in Sections 2.2(a) and 2.2(b) are effective on the date Contributor first makes Commercial Use of the Covered Code.

(d) Notwithstanding Section 2.2(b) above, no patent license is granted: 1) for any code that Contributor has deleted from the Contributor Version; 2) separate from the Contributor Version; 3) for infringements caused by: i) third party modifications of Contributor Version or ii) the combination of Modifications made by that Contributor with other software (except as part of the Contributor Version) or other devices; or 4) under Patent Claims infringed by Covered Code in the absence of Modifications made by that Contributor.

3. Distribution Obligations.

3.1. Application of License. The Modifications which You create or to which You contribute are governed by the terms of this License, including without limitation Section 2.2. The Source Code version of Covered Code may be distributed only under the terms of this License or a future version of this License released under Section 6.1, and You must include a copy of this License with every copy of the Source Code You distribute. You may not offer or impose any terms on any Source Code version that alters or restricts the applicable version of this License or the recipients' rights hereunder. However, You may include an additional document offering the additional rights described in Section 3.5.
3.2. Availability of Source Code. Any Modification which You create or to which You contribute must be made available in Source Code form under the terms of this License either on the same media as an Executable version or via an accepted Electronic Distribution Mechanism to anyone to whom you made an Executable version available; and if made available via Electronic Distribution Mechanism, must remain available for at least twelve (12) months after the date it initially became available, or at least six (6) months after a subsequent version of that particular Modification has been made available to such recipients. You are responsible for ensuring that the Source Code version remains available even if the Electronic Distribution Mechanism is maintained by a third party.
3.3. Description of Modifications. You must cause all Covered Code to which You contribute to contain a file documenting the changes You made to create that Covered Code and the date of any change. You must include a prominent statement that the Modification is derived, directly or indirectly, from Original Code provided by the Initial Developer and including the name of the Initial Developer in (a) the Source Code, and (b) in any notice in an Executable version or related documentation in which You describe the origin or ownership of the Covered Code.

3.4. Intellectual Property Matters

(a) Third Party Claims. If Contributor has knowledge that a license under a third party's intellectual property rights is required to exercise the rights granted by such Contributor under Sections 2.1 or 2.2, Contributor must include a text file with the Source Code distribution titled "LEGAL" which describes the claim and the party making the claim in sufficient detail that a recipient will know whom to contact. If Contributor obtains such knowledge after the Modification is made available as described in Section 3.2, Contributor shall promptly modify the LEGAL file in all copies Contributor makes available thereafter and shall take other steps (such as notifying appropriate mailing lists or newsgroups) reasonably calculated to inform those who received the Covered Code that new knowledge has been obtained.

(b) Contributor APIs. If Contributor's Modifications include an application programming interface and Contributor has knowledge of patent licenses which are reasonably necessary to implement that API, Contributor must also include this information in the LEGAL file.

(c) Representations.

Contributor represents that, except as disclosed pursuant to Section 3.4(a) above, Contributor believes that Contributor's Modifications are Contributor's original creation(s) and/or Contributor has sufficient rights to grant the rights conveyed by this License.

3.5. Required Notices. You must duplicate the notice in Exhibit A in each file of the Source Code. If it is not possible to put such notice in a particular Source Code file due to its structure, then You must include such notice in a location (such as a relevant directory) where a user would be likely to look for such a notice. If You created one or more Modification(s) You may add your name as a Contributor to the notice described in Exhibit A. You must also duplicate this License in any documentation for the Source Code where You describe recipients' rights or ownership rights relating to Covered Code. You may choose to offer, and to charge a fee for, warranty, support, indemnity or liability obligations to one or more recipients of Covered Code. However, You may do so only on Your own behalf, and not on behalf of the Initial Developer or any Contributor. You must make it absolutely clear than any such warranty, support, indemnity or liability obligation is offered by You alone, and You hereby agree to indemnify the Initial Developer and every Contributor for any liability incurred by the Initial Developer or such Contributor as a result of warranty, support, indemnity or liability terms You offer.

3.6. Distribution of Executable Versions. You may distribute Covered Code in Executable form only if the requirements of Section 3.1-3.5 have been met for that Covered Code, and if You include a notice stating that the Source Code version of the Covered Code is available under the terms of this License, including a description of how and where You have fulfilled the obligations of Section 3.2. The notice must be conspicuously included in any notice in an Executable version, related documentation or collateral in which You describe recipients' rights relating to the Covered Code. You may distribute the Executable version of Covered Code or ownership rights under a license of Your choice, which may contain terms different from this License, provided that You are in compliance with the terms of this License and that the license for the Executable version does not attempt to limit or alter the recipient's rights in the Source Code version from the rights set forth in this License. If You distribute the Executable version under a different license You must make it absolutely clear that any terms which differ from this License are offered by You alone, not by the Initial Developer or any Contributor. You hereby agree to indemnify the Initial Developer and every Contributor for any liability incurred by the Initial Developer or such Contributor as a result of any such terms You offer.

3.7. Larger Works. You may create a Larger Work by combining Covered Code with other code not governed by the terms of this License and distribute the Larger Work as a single product. In such a case, You must make sure the requirements of this License are fulfilled for the Covered Code.

4. Inability to Comply Due to Statute or Regulation.

If it is impossible for You to comply with any of the terms of this License with respect to some or all of the Covered Code due to statute, judicial order, or regulation then You must: (a) comply with the terms of this License to the maximum extent possible; and (b) describe the limitations and the code they affect. Such description must be included in the LEGAL file described in Section 3.4 and must be included with all distributions of the Source Code. Except to the extent prohibited by statute or regulation, such description must be sufficiently detailed for a recipient of ordinary skill to be able to understand it.

5. Application of this License.

This License applies to code to which the Initial Developer has attached the notice in Exhibit A and to related Covered Code.

6. Versions of the License.

6.1. New Versions. Netscape Communications Corporation ("Netscape") may publish revised and/or new versions of the License from time to time. Each version will be given a distinguishing version number.

6.2. Effect of New Versions. Once Covered Code has been published under a particular version of the License, You may always continue to use it under the terms of that version. You may also choose to use such Covered Code under the terms of any subsequent version of the License published by Netscape. No one other than Netscape has the right to modify the terms applicable to Covered Code created under this License.

6.3. Derivative Works. If You create or use a modified version of this License (which you may only do in order to apply it to code which is not already Covered Code governed by this License), You must (a) rename Your license so that the phrases "Mozilla", "MOZILLAPL", "MOZPL", "Netscape", "MPL", "NPL" or any confusingly similar phrase do not appear in your license (except to note that your license differs from this License) and (b) otherwise make it clear that Your version of the license contains terms which differ from the Mozilla Public License and Netscape Public License. (Filling in the name of the Initial Developer, Original Code or Contributor in the notice described in Exhibit A shall not of themselves be deemed to be modifications of this License.)

7. DISCLAIMER OF WARRANTY.

COVERED CODE IS PROVIDED UNDER THIS LICENSE ON AN "AS IS" BASIS, WITHOUT WARRANTY OF ANY KIND, EITHER EXPRESSED OR IMPLIED, INCLUDING, WITHOUT LIMITATION, WARRANTIES THAT THE COVERED CODE IS FREE OF DEFECTS, MERCHANTABILITY, FIT FOR A PARTICULAR PURPOSE OR NON-INFRINGEMENT. THE ENTIRE RISK AS TO THE QUALITY AND PERFORMANCE OF THE COVERED CODE IS WITH YOU. SHOULD ANY COVERED CODE PROVE DEFECTIVE IN ANY RESPECT, YOU (NOT THE INITIAL DEVELOPER OR ANY OTHER CONTRIBUTOR) ASSUME THE COST OF ANY NECESSARY SERVICING, REPAIR OR CORRECTION. THIS DISCLAIMER OF WARRANTY CONSTITUTES AN ESSENTIAL PART OF THIS LICENSE. NO USE OF ANY COVERED CODE IS AUTHORIZED HEREUNDER EXCEPT UNDER THIS DISCLAIMER.

8. TERMINATION.

8.1. This License and the rights granted hereunder will terminate automatically if You fail to comply with terms herein and fail to cure such breach within 30 days of becoming aware of the breach. All sublicenses to the Covered Code which are properly granted shall survive any termination of this License. Provisions which, by their nature, must remain in effect beyond the termination of this License shall survive.

8.2. If You initiate litigation by asserting a patent infringement claim (excluding declaratory judgment actions) against Initial Developer or a Contributor (the Initial Developer or Contributor against whom You file such action is referred to as "Participant") alleging that:

(a) such Participant's Contributor Version directly or indirectly infringes any patent, then any and all rights granted by such Participant to You under Sections 2.1 and/or 2.2 of this License shall, upon 60 days notice from Participant terminate prospectively, unless if within 60 days after receipt of notice You either: (i) agree in writing to pay Participant a mutually agreeable reasonable royalty for Your past and future use of Modifications made by such Participant, or (ii) withdraw Your litigation claim with respect to the Contributor Version against such Participant. If within 60 days of notice, a reasonable royalty and payment arrangement are not mutually agreed upon in writing by the parties or the litigation claim is not withdrawn, the rights granted by Participant to You under Sections 2.1 and/or 2.2 automatically terminate at the expiration of the 60 day notice period specified above.

(b) any software, hardware, or device, other than such Participant's Contributor Version, directly or indirectly infringes any patent, then any rights granted to You by such Participant under Sections 2.1(b) and 2.2(b) are revoked effective as of the date You first made, used, sold, distributed, or had made, Modifications made by that Participant.

8.3. If You assert a patent infringement claim against Participant alleging that such Participant's Contributor Version directly or indirectly infringes any patent where such claim is resolved (such as by license or settlement) prior to the initiation of patent infringement litigation, then the reasonable value of the licenses granted by such Participant under Sections 2.1 or 2.2 shall be taken into account in determining the amount or value of any payment or license.

8.4. In the event of termination under Sections 8.1 or 8.2 above, all end user license agreements (excluding distributors and resellers) which have been validly granted by You or any distributor hereunder prior to termination shall survive termination.

9. LIMITATION OF LIABILITY.

UNDER NO CIRCUMSTANCES AND UNDER NO LEGAL THEORY, WHETHER TORT (INCLUDING NEGLIGENCE), CONTRACT, OR OTHERWISE, SHALL YOU, THE INITIAL DEVELOPER, ANY OTHER CONTRIBUTOR, OR ANY DISTRIBUTOR OF COVERED CODE, OR ANY SUPPLIER OF ANY OF SUCH PARTIES, BE LIABLE TO ANY PERSON FOR ANY INDIRECT, SPECIAL, INCIDENTAL, OR CONSEQUENTIAL DAMAGES OF ANY CHARACTER INCLUDING, WITHOUT LIMITATION, DAMAGES FOR LOSS OF GOODWILL, WORK STOPPAGE, COMPUTER FAILURE OR MALFUNCTION, OR ANY AND ALL OTHER COMMERCIAL DAMAGES OR LOSSES, EVEN IF SUCH PARTY SHALL HAVE BEEN INFORMED OF THE POSSIBILITY OF SUCH DAMAGES. THIS LIMITATION OF LIABILITY SHALL NOT APPLY TO LIABILITY FOR DEATH OR PERSONAL INJURY RESULTING FROM SUCH PARTY'S NEGLIGENCE TO THE EXTENT APPLICABLE LAW PROHIBITS SUCH LIMITATION. SOME JURISDICTIONS DO NOT ALLOW THE EXCLUSION OR LIMITATION OF INCIDENTAL OR CONSEQUENTIAL DAMAGES, SO THIS EXCLUSION AND LIMITATION MAY NOT APPLY TO YOU. 10. U.S. GOVERNMENT END USERS.

The Covered Code is a "commercial item," as that term is defined in 48 C.F.R. 2.101 (Oct. 1995), consisting of "commercial computer software" and "commercial computer software documentation," as such terms are used in 48 C.F.R. 12.212 (Sept. 1995). Consistent with 48 C.F.R. 12.212 and 48 C.F.R. 227.7202-1 through 227.7202-4 (June 1995), all U.S. Government End Users acquire Covered Code with only those rights set forth herein.

11. MISCELLANEOUS.

This License represents the complete agreement concerning subject matter hereof. If any provision of this License is held to be unenforceable, such provision shall be reformed only to the extent necessary to make it enforceable. This License shall be governed by California law provisions (except to the extent applicable law, if any, provides otherwise), excluding its conflictof-law provisions. With respect to disputes in which at least one party is a citizen of, or an entity chartered or registered to do business in the United States of America, any litigation relating to this License shall be subject to the jurisdiction of the Federal Courts of the Northern District of California, with venue lying in Santa Clara County, California, with the losing party responsible for costs, including without limitation, court costs and reasonable attorneys' fees and expenses. The application of the United Nations Convention on Contracts for the International Sale of Goods is expressly excluded. Any law or regulation which provides that the language of a contract shall be construed against the drafter shall not apply to this License.

12. RESPONSIBILITY FOR CLAIMS.

As between Initial Developer and the Contributors, each party is responsible for claims and damages arising, directly or indirectly, out of its utilization of rights under this License and You agree to work with Initial Developer and Contributors to distribute such responsibility on an equitable basis. Nothing herein is intended or shall be deemed to constitute any admission of liability.

13. MULTIPLE-LICENSED CODE.

Initial Developer may designate portions of the Covered Code as Multiple-Licensed. Multiple-Licensedmeans that the Initial Developer permits you to utilize portions of the Covered Code under Your choice of the MPL or the alternative licenses, if any, specified by the Initial Developer in the file described in Exhibit A.

EXHIBIT A -Mozilla Public License.

The contents of this file are subject to the Mozilla Public License Version 1.1 (the "License"); you may not use this file except in compliance with the License. You may obtain a copy of the License at http://www.mozilla.org/MPL/Software distributed under the License is distributed on an "AS IS" basis, WITHOUT WARRANTY OF ANY KIND, either express or implied. See the License for the specific language governing rights and limitations under the License.

The Original Code is ____.

The Initial Developer of the Original Code is ____. Portions created by ____ are Copyright (C) ____. All Rights Reserved.

Contributor(s): ____.

Alternatively, the contents of this file may be used under the terms of the ____ license (the [____] License), in which case the provisions of [____] License are applicable instead of those above. If you wish to allow use of your version of this file only under the terms of the [____] License and not to allow others to use your version of this file under the MPL, indicate your decision by deleting the provisions above and replace them with the notice and other provisions required by the [____] License. If you do not delete the provisions above, a recipient may use your version of this file under either the MPL or the [____] License."

[NOTE: The text of this Exhibit A may differ slightly from the text of the notices in the Source Code files of the Original Code. You should use the text of this Exhibit A rather than the text found in the Original Code Source Code for Your Modifications

The software included in this product contains copyrighted software that is licensed under the JPEG license.

- JPEG license

- Code project. Generating Outline OpenGL, Libjpeg

This distribution contains the sixth public release of the Independent JPEG Group's free JPEG software. You are welcome to redistribute this software and to use it for any purpose, subject to the conditions under LEGAL ISSUES, below.

Serious users of this software (particularly those incorporating it into larger programs) should contact IJG at jpeg-info@uunet.uu.net to be added to our electronic mailing list. Mailing list members are notified of updates and have a chance to participate in technical discussions, etc.

This software is the work of Tom Lane, Philip Gladstone, Jim Boucher, Lee Crocker, Julian Minguillon, Luis Ortiz, George Phillips, Davide Rossi, Guido Vollbeding, Ge' Weijers, and other members of the Independent JPEG Group.

IJG is not affiliated with the official ISO JPEG standards committee.

In plain English:

  1. We don't promise that this software works. (But if you find any bugs, please let us know!)
  2. You can use this software for whatever you want. You don't have to pay us.
  3. You may not pretend that you wrote this software. If you use it in a program, you must acknowledge somewhere in your documentation that you've used the IJG code.

In legalese:

The authors make NO WARRANTY or representation, either express or implied, with respect to this software, its quality, accuracy, merchantability, or fitness for a particular purpose. This software is provided "AS IS", and you, its user, assume the entire risk as to its quality and accuracy.

This software is copyright (C) 1991-1998, Thomas G. Lane. All Rights Reserved except as specified below.

Permission is hereby granted to use, copy, modify, and distribute this software (or portions thereof) for any purpose, without fee, subject to these conditions:

(1) If any part of the source code for this software is distributed, then this README file must be included, with this copyright and no-warranty notice unaltered; and any additions, deletions, or changes to the original files must be clearly indicated in accompanying documentation.
(2) If only executable code is distributed, then the accompanying documentation must state that "this software is based in part on the work of the Independent JPEG Group".
(3) Permission for use of this software is granted only if the user accepts full responsibility for any undesirable consequences; the authors accept NO LIABILITY for damages of any kind.

These conditions apply to any software derived from or based on the IJG code, not just to the unmodified library. If you use our work, you ought to acknowledge us.

Permission is NOT granted for the use of any IJG author's name or company name in advertising or publicity relating to this software or products derived from it. This software may be referred to only as "the Independent JPEG Group's software".

We specifically permit and encourage the use of this software as the basis of commercial products, provided that all warranty or liability claims are assumed by the product vendor.

ansi2knr.c is included in this distribution by permission of L. Peter Deutsch, sole proprietor of its copyright holder, Aladdin Enterprises of Menlo Park, CA. ansi2knr.c is NOT covered by the above copyright and conditions, but instead by the usual distribution terms of the Free Software Foundation; principally, that you must include source code if you redistribute it. (See the file ansi2knr.c for full details.) However, since ansi2knr.c is not needed as part of any program generated from the IJG code, this does not limit you more than the foregoing paragraphs do.

The Unix configuration script "configure" was produced with GNU Autoconf. It is copyright by the Free Software Foundation but is freely distributable. The same holds for its supporting scripts (config.guess, config.sub, ltconfig, ltmain.sh). Another support script, install-sh, is copyright by M.I.T. but is also freely distributable.

It appears that the arithmetic coding option of the JPEG spec is covered by patents owned by IBM, AT&T, and Mitsubishi. Hence arithmetic coding cannot legally be used without obtaining one or more licenses. For this reason, support for arithmetic coding has been removed from the free JPEG software. (Since arithmetic coding provides only a marginal gain over the unpatented Huffman mode, it is unlikely that very many implementations will support it.) So far as we are aware, there are no patent restrictions on the remaining code.

The IJG distribution formerly included code to read and write GIF files. To avoid entanglement with the Unisys LZW patent, GIF reading support has been removed altogether, and the GIF writer has been simplified to produce "uncompressed GIFs". This technique does not use the LZW algorithm; the resulting GIF files are larger than usual, but are readable by all standard GIF decoders.

We are required to state that

"The Graphics Interchange Format(c) is the Copyright property of CompuServe Incorporated. GIF(sm) is a Service Mark property of CompuServe Incorporated."

- This Product uses the Source Code of T-Kernel under T-License granted by the T-Engine Forum(www.t-engine.org)

T-License [License Agreement for Source Code of T-Kernel]

established by T-Engine Forum

on January 23, 2004

revised on June 17, 2004

revised on December 21, 2006

revised on March 24, 2009

Article 1. Scope of License Agreement

  1. This License Agreement sets forth copyrights and the terms and conditions of use applicable to the source code of T-Kernel distributed by T-Engine Forum and any derivative work created therefrom.

Article 2. Definition

  1. "T-Kernel" means a real-time operating system controlled and distributed by T-Engine Forum on behalf of the copyright holder thereof.
  2. "Source Code" means a source program, including related comments and documentations, for the T-Kernel and the Ported Source Code defined in Article 2.8 which is registered with T-Engine Forum.
  3. "Hardware-dependent Part" means the part of the Source Code which depends on hardware and needs to be changed when the Source Code is ported and operated on the target hardware, and is designated and separated as such part.
  4. "Compiler-dependent Part" means the part of the Source Code which depends on compiler and needs to be changed when the Source Code is ported and operated on the target hardware, and is designated and separated as such part.
  5. "Header File" means the part of the Source Code which contains definitions necessary to develop application programs.
  6. "T-Engine Hardware" means the hardware which is manufactured in accordance with the T-Engine Hardware specifications or the μT-Engine Hardware specifications issued by T-Engine Forum, and registered with T-Engine Forum.
  7. "Similar Hardware to T-Engine Hardware" means any hardware (including software which emulates hardware) other than that defined in Article 2.6 above, on which the T-Kernel can be operated.
  8. "Ported Source Code" means a source program produced from the Source Code by modifying only its Hardware-dependent Part and/or Compiler-dependent Part to enable it to be operated on the T-Engine Hardware or the Similar Hardware to T-Engine Hardware. The Ported Source Code which is registered with T-Engine Forum shall be included in the Source Code.
  9. "Modified Source Code" means a source program modified from the Source Code for the purpose of improving its performance, increasing or decreasing its function, and the like. The Ported Source Code shall not be included in the Modified Source Code.

  10. "Binary Code" means an executable code form which is created by compiling programs, which include all or part of the Source Code or the Modified Source Code.

  11. "Derivative Work" means the Modified Source Code or the Binary Code.
  12. "Embedded Product" means any product which operates with executable code form of the Source Code, the Modified Source Code or the Binary Code loaded on its hardware.
  13. "End User" means a consumer who uses the Embedded Product.
  14. "System Developer" means any person who develops the Embedded Product by itself or has a third party develop the same, and provides, whether with or without payment, the End User with the Embedded Product.
  15. "Distributor of Modification" means any person who produces the Modified Source Code and, whether with or without payment, distributes the same to any third party.
  16. "Patch for Modification" means a difference, program, system, or the like in order to create the Modified Source Code from the Source Code or the Binary Code thereof.
  17. "Vicarious Execution of Patch Processing" means vicarious execution service to create the Modified Source Code applying the Patch for Modification to the Source Code or the Binary Code thereof.
  18. "Source Code User" means a person who uses the Source Code.
  19. "Distribution" means any of the following acts:

  20. to transmit a work to a large number of specific persons through the Internet communication, broadcasting, and the like;

  21. to transmit a work to the general public through the Internet communication, broadcasting, and the like automatically in response to a request from the public; and

  22. to distribute a copy of a work to the general public or a large number of specific persons.

Article 3. Copyright

  1. The copyrights of the Source Code shall be owned by Ken Sakamura.

Article 4. License of Source Code

  1. As provided for in this Article, T-Engine Forum shall provide, and grant a license to use, the Source Code free of charge to any person who has taken the necessary procedure for registration as prescribed by T-Engine Forum and agreed to the T-License.
  2. The Source Code shall be distributed exclusively by T-Engine Forum. Any person who obtains the Source Code under Article 4.1 above shall not make any re-Distribution of the Source Code.
  3. In accordance with the license granted under Article 4.1 above, the Source Code User may perform the following acts:

  4. to copy and/or modify the Source Code provided by T-Engine Forum hereunder for its own research, development and the like.

  5. to run the Source Code provided by T-Engine Forum hereunder for its own research, development and the like.
  6. to run the Source Code modified in accordance with the provision of Article 4.3 (1) above for its own research, development and the like.
  7. to distribute the Binary Code created from the Source Code provided by T-Engine Forum hereunder or from the Source Code modified in accordance with the provision of Article 4.3 (1) above.
  8. In accordance with the license granted under Article 4.1 above, the System Developer may perform the following acts:
  9. to perform any and all acts set forth in the Article 4.3 above.
  10. to develop and manufacture the Embedded Product containing the Binary Code, and, whether with or without payment, provide the End User with the same and make the Binary Code available to the End User on the Embedded Product.
  11. The Source Code User and the System Developer shall be obligated to give a notice that the Source Code is used, in such a way as separately specified by T-Engine Forum, when they use the Source Code or the Binary Code, or make the Binary Code available for the End User on the Embedded Product.

Article 5. Distribution of Modified Source Code

  1. Any of A- members of T-Engine Forum may become the Distributor of Modification by obtaining the approval of T-Engine Forum through the registration procedure as prescribed by the Forum provided that only the department of the A- member which has taken the registration procedure may distribute the Modified Source Code in such a way as provided for in this Article as long as it holds the Amembership.
  2. The Distributor of Modification may create the Modified Source Code based on the Source Code provided by T-Engine Forum and the Patch for Modification to be applied to create such Modified Source Code from the Source Code.
  3. The Distributor of Modification shall, prior to the distribution, inform T-Engine Forum of and register a name and description of the Modified Source Code in such a way as specified by T-Engine Forum.

  4. The Distributor of Modification shall determine the name of the Modified Source Code subject to the rules separately established by T-Engine Forum and publish an appropriate notice as required by the rules on the Patch for Modification and the Modified Source Code.

  5. The Distributor of Modification may distribute the Modified Source Code to a third party, whether with or without payment, provided that the Distributor of Modification shall take the necessary measures to prohibit the third party from making the re-Distribution of the Modified Source Code.
  6. Developer with the Patch for Modification. Provided, however, that the Distributor of Modification shall be obligated to confirm that the System Developer is the Source Code User duly licensed under Article 4.1.
  7. The Distributor of Modification may perform the Vicarious Execution of Patch Processing for the System Developer.
  8. The System Developer shall not distribute the Modified Source Code in further modified form to any third party as a stand-alone software product.
  9. The System Developer may, under the same obligation as imposed in Article 4.5, make the Embedded Product available for the End User through use of the Patch for Modification distributed by the Distributor of Modification or the Derivative Works obtained through the Vicarious Execution of Patch Processing.

Article 6. Distribution and Registration of the Ported Source Code

  1. The Source Code User and the System Developer may, whether with or without charge, distribute to any third party only the following parts of the Ported Source Code on the T-Engine Hardware or the Similar Hardware to T-Engine Hardware:
  2. The Hardware-dependent Part and/or Compiler-dependent Part; provided that the Source Code User and the System Developer shall inform T-Engine Forum of, and T-Engine Forum may publish, a method for distributing said Part(s) to third parties.
  3. The Header File; provided that the Header File shall be distributed together with the Binary Code of the Ported Source Code.
  4. Any member of T-Engine Forum may request T-Engine Forum to register and distribute, as an original source code for T-Kernel, the Ported Source Code on the T-Engine Hardware or the Similar Hardware to T-Engine Hardware.
  5. Any member of T-Engine Forum who requests the distribution mentioned in the preceding paragraph shall accede to the following conditions:

  6. The member shall confirm that the object hardware is the T-Engine Hardware or the Similar Hardware to T-Engine Hardware.

  7. The member shall provide T-Engine Forum with a complete set of operational environment for the object hardware and T-Kernel free of charge when requesting the distribution.
  8. The member shall submit test results of the Ported Source Code to T-Engine Forum when requesting the distribution.
  9. In the event that T-Engine Forum accepts the request mentioned in Article 6.2, T-Engine Forum shall register and

distribute the Ported Source Code as the Source Code for T-Kernel. Provided, however, that the Ported Source Code may be treated in the same way as the Modified Source Code until the time of registration hereunder.

  1. The provision set forth in Article 3 shall apply to the Ported Source Code registered in accordance with this Article.

Article 7. Use for Other Purpose

  1. Any use of the Source Code, the Modified Source Code or the Ported Source Code other than those stipulated in Articles 4, 5 and 6 shall be subject to the prior approval of T-Engine Forum.

Article 8. Limited Warranty

  1. T-Engine Forum and the copyright holder of the Source Code warrant that the Source Code does not infringe third party's copyrights. Provided, however, that T-Engine Forum and the copyright holder of the Source Code make no warranty as to the Hardware-dependent Part and/or Compiler-dependent Part set forth in Article 6.2 in the Ported Source Code by any third party.
  2. Neither T-Engine Forum nor the copyright holder of the Source Code warrants that the Source Code will fit for any particular purpose of the Source Code User.
  3. Neither T-Engine Forum nor the copyright holder of the Source Code warrants that the Source Code does not infringe any third party's industrial property rights. In no event shall T-Engine Forum and the copyright holder of the Source Code be liable for any dispute which may arise between the Source Code User and a third party in connection with the third party's industrial property rights.

Article 9. Indemnity

  1. Neither T-Engine Forum nor the copyright holder of the Source Code shall be liable for any damages (including, but not limited to, damages resulting from loss of profit, business interruption, loss of business information or any other pecuniary damage) arising out of use or impossibility of use of the Source Code, even if T-Engine Forum and the copyright holder have been informed of the possibility of such damages.

Article 10. Breach of Agreement

  1. In case that T-Engine Forum considers that this License Agreement is breached or that the popularization of T-Kernel is obstructed, T-Engine Forum shall take measures to correct such breach or such obstruction, take measures on the ground of copyright infringement, or take any other necessary measures against the breaching person or the obstructing person, regardless of whether or not the said person is a member of T-Engine Forum.
  2. In case of breach of this License Agreement by a member of T-Engine Forum, T-Engine Forum may take appropriate measures against the member; for example, the member is disqualified from membership, depending on what kind of breach has been committed by it.
  3. Any legal dispute which may arise in relation to any breach of this License Agreement shall be subject to the exclusive jurisdiction of the Tokyo District Court.

Article 11. Governing Law and Language

  1. This License Agreement shall be governed by and interpreted under the laws of Japan.
  2. This License Agreement is executed in both Japanese text and English text provided that the Japanese text shall govern the interpretation and performance of this License Agreement.

Apache License 2.0

Component Name License URL

mDNSResponder_bonjour Apache License 2.0 http://www.apache.org/licenses/LICENSE-2.0

TERMS AND CONDITIONS FOR USE, REPRODUCTION, AND DISTRIBUTION

  1. Definitions.

"License" shall mean the terms and conditions for use, reproduction, and distribution as defined by Sections 1 through 9 of this document.

"Licensor" shall mean the copyright owner or entity authorized by the copyright owner that is granting the License.

"Legal Entity" shall mean the union of the acting entity and all other entities that control, are controlled by, or are under common control with that entity. For the purposes of this definition, "control" means (i) the power, direct or indirect, to cause the direction or management of such entity, whether by contract or otherwise, or (ii) ownership of fifty percent (50%) or more of the outstanding shares, or (iii) beneficial ownership of such entity.

"You" (or "Your") shall mean an individual or Legal Entity exercising permissions granted by this License. "Source" form shall mean the preferred form for making modifications, including but not limited to software source code, documentation source, and configuration files.

"Object" form shall mean any form resulting from mechanical transformation or translation of a Source form, including but not limited to compiled object code, generated documentation, and conversions to other media types.
"Work" shall mean the work of authorship, whether in Source or Object form, made available under the License, as indicated by a copyright notice that is included in or attached to the work (an example is provided in the Appendix below).
"Derivative Works" shall mean any work, whether in Source or Object form, that is based on (or derived from) the Work and for which the editorial revisions, annotations, elaborations, or other modifications represent, as a whole, an original work of authorship. For the purposes of this License, Derivative Works shall not include works that remain separable from, or merely link (or bind by name) to the interfaces of, the Work and Derivative Works thereof.
"Contribution" shall mean any work of authorship, including the original version of the Work and any modifications or additions to that Work or Derivative Works thereof, that is intentionally submitted to Licensor for inclusion in the Work by the copyright owner or by an individual or Legal Entity authorized to submit on behalf of the copyright owner. For the purposes of this definition, "submitted" means

any form of electronic, verbal, or written communication sent to the Licensor or its representatives, including but not limited to communication on electronic mailing lists, source code control systems, and issue tracking systems that are managed by, or on behalf of, the Licensor for the purpose of discussing and improving the Work, but excluding communication that is conspicuously marked or otherwise designated in writing by the copyright owner as "Not a Contribution." "Contributor" shall mean Licensor and any individual or Legal Entity on behalf of whom a Contribution has been received by Licensor and subsequently incorporated within the Work.

  1. Grant of Copyright License. Subject to the terms and conditions of this License, each Contributor hereby grants to You a perpetual, worldwide, non-exclusive, no-charge, royalty-free, irrevocable copyright license to reproduce, prepare Derivative Works of, publicly display, publicly perform, sublicense, and distribute the Work and such Derivative Works in Source or Object form.
  2. Grant of Patent License. Subject to the terms and conditions of this License, each Contributor hereby grants to You a perpetual, worldwide, non-exclusive, no-charge, royaltyfree, irrevocable (except as stated in this section) patent license to make, have made, use, offer to sell, sell, import, and otherwise transfer the Work, where such license applies only to those patent claims licensable by such Contributor that are necessarily infringed by their Contribution(s) alone or by combination of their Contribution(s) with the Work to which such Contribution(s) was submitted. If You institute patent litigation against any entity (including a crossclaim or counterclaim in a lawsuit) alleging that the Work or a Contribution incorporated within the Work constitutes direct or contributory patent infringement, then any patent licenses granted to You under this License for that Work shall terminate as of the date such litigation is filed.
  3. Redistribution. You may reproduce and distribute copies of the Work or Derivative Works thereof in any medium, with or without modifications, and in Source or Object form, provided that You meet the following conditions:

(a) You must give any other recipients of the Work or Derivative Works a copy of this License; and

(b) You must cause any modified files to carry prominent notices stating that You changed the files; and

(c) You must retain, in the Source form of any Derivative Works that You distribute, all copyright, patent, trademark, and attribution notices from the Source form of the Work, excluding those notices that do not pertain to any part of the Derivative Works; and

(d) If the Work includes a "NOTICE" text file as part of its distribution, then any Derivative Works that You distribute must include a readable copy of the attribution notices contained within such NOTICE file, excluding those notices that do not pertain to any part of the Derivative Works, in at least one of the following places: within a NOTICE text file distributed as part of the Derivative Works; within the Source form or documentation, if provided along with the Derivative Works; or, within a display generated by the Derivative Works, if and wherever such third-party notices normally appear. The contents of the NOTICE file are for informational purposes only and do not modify the License. You may add Your own attribution notices within Derivative Works that You distribute, alongside or as an addendum to the NOTICE text from the Work, provided that such additional attribution notices cannot be construed as modifying the License.

You may add Your own copyright statement to Your modifications and may provide additional or different license terms and conditions for use, reproduction, or distribution of Your modifications, or for any such Derivative Works as a whole, provided Your use, reproduction, and distribution of the Work otherwise complies with the conditions stated in this License.

  1. Submission of Contributions. Unless You explicitly state otherwise, any Contribution intentionally submitted for inclusion in the Work by You to the Licensor shall be under the terms and conditions of this License, without any additional terms or conditions. Notwithstanding the above, nothing herein shall supersede or modify the terms of any separate license agreement you may have executed with Licensor regarding such Contributions.
  2. Trademarks. This License does not grant permission to use the trade names, trademarks, service marks, or product names of the Licensor, except as required for reasonable and customary use in describing the origin of the Work and reproducing the content of the NOTICE file.
  3. Disclaimer of Warranty. Unless required by applicable law or agreed to in writing, Licensor provides the Work (and each Contributor provides its Contributions) on an "AS IS" BASIS, WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied, including, without limitation, any warranties or conditions of TITLE, NONINFRINGEMENT, MERCHANTABILITY, or FITNESS FOR A PARTICULAR PURPOSE. You are solely responsible for determining the appropriateness of using or redistributing the Work and assume any risks associated with Your exercise of permissions under this License.
  4. Limitation of Liability. In no event and under no legal theory, whether in tort (including negligence), contract, or otherwise, unless required by applicable law (such as deliberate and grossly negligent acts) or agreed to in writing, shall any Contributor be liable to You for damages, including any direct, indirect, special, incidental, or consequential damages of any character arising as a result of this License or out of the use or inability to use the Work (including but not limited to damages for loss of goodwill, work stoppage, computer failure or malfunction, or any and all other commercial damages or losses), even if such Contributor has been advised of the possibility of such damages.
  5. Accepting Warranty or Additional Liability. While redistributing the Work or Derivative Works thereof, You may choose to offer, and charge a fee for, acceptance of support, warranty, indemnity, or other liability obligations and/or rights consistent with this License. However, in accepting such obligations, You may act only on Your own behalf and on Your sole responsibility, not on behalf of any other Contributor, and only if You agree to indemnify, defend, and hold each Contributor harmless for any liability incurred by, or claims asserted against, such Contributor by reason of your accepting any such warranty or additional liability.

enD OF terMs anD cOnDitiOns

APPENDIX: How to apply the Apache License to your work.

To apply the Apache License to your work, attach the following boilerplate notice, with the fields enclosed by brackets "[]" replaced with your own identifying information. (Don't include the brackets!) The text should be enclosed in the appropriate comment syntax for the file format. We also recommend that a file or class name and description of purpose be included on the same "printed page" as the copyright notice for easier identification within third-party archives.

Licensed under the Apache License, Version 2.0 (the "License"); you may not use this file except in compliance with the License. You may obtain a copy of the License at http://www.apache.org/licenses/LICENSE-2.0

Unless required by applicable law or agreed to in writing, software distributed under the License is distributed on an "AS IS" BASIS, WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied. See the License for the specific language governing permissions and limitations under the License.

This program, "bzip2", the associated library "libbzip2", and all documentation, are copyright (C) 1996-2007 Julian R Seward. All rights reserved.

Component Name License URL

bzip2-1.0.5 Bzip2 http://www.bzip.org/

Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met:

  1. Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer.
  2. The origin of this software must not be misrepresented; you must not claim that you wrote the original software. If you use this software in a product, an acknowledgment in the product documentation would be appreciated but is not required.
  3. Altered source versions must be plainly marked as such, and must not be misrepresented as being the original software.
  4. The name of the author may not be used to endorse or promote products derived from this software without specific prior written permission.

THIS SOFTWARE IS PROVIDED BY THE AUTHOR "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE AUTHOR BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

Julian Seward, jseward@bzip.org

bzip2/libbzip2 version 1.0.5 of 10 December 2007

University of Illinois / NCSA Open Source License

Copyright (c) 1999-2007, The Board of Trustees of the University of Illinois All Rights Reserved.

Component Name License

iperf-2.0.5 University of Illinois / NCSA Open Source

Iperf performance test

Mark Gates

Ajay Tirumala

Jim Ferguson

Jon Dugan

Feng Qin

Kevin Gibbs

John Estabrook

National Laboratory for Applied Network Research

National Center for Supercomputing Applications

University of Illinois at Urbana-Champaign

http://www.ncsa.uiuc.edu

Permission is hereby granted, free of charge, to any person obtaining a copy of this software (lperf) and associated documentation files (the "Software"), to deal in the Software without restriction, including without limitation the rights to use, copy, modify, merge, publish, distribute, sublicense, and/or sell copies of the Software, and to permit persons to whom the Software is furnished to do so, subject to the following conditions:

Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimers.

Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimers in the documentation and/or other materials provided with the distribution.

Neither the names of the University of Illinois, NCSA, nor the names of its contributors may be used to endorse or promote products derived from this Software without specific prior written permission. THE SOFTWARE IS PROVIDED "AS IS", WITHOUT WARRANTY OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO THE WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT. IN NO EVENT SHALL THE CONTRIBUTORS OR COPYRIGHT HOLDERS BE LIABLE FOR ANY CLAIM, DAMAGES OR OTHER LIABILITY, WHETHER IN AN ACTION OF CONTRACT, TORT OR OTHERWISE, ARISING FROM, OUT OF OR IN CONNECTION WITH THE SOFTWARE OR THE USE OR OTHER DEALINGS IN THE SOFTWARE.

The PHP License, version 3.01 Copyright (c) 1999 - 2010 The PHP Group. All rights reserved.

Component Name License URL

php-5.2.17 PHP 3.01 http://www.php.net/distributions

Redistribution and use in source and binary forms, with or without modification, is permitted provided that the following conditions are met:

  1. Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer.
  2. Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution.
  3. The name "PHP" must not be used to endorse or promote products derived from this software without prior written permission. For written permission, please contact group@php.net.
  4. Products derived from this software may not be called "PHP", nor may "PHP" appear in their name, without prior written permission from group@php.net. You may indicate that your software works in conjunction with PHP by saying "Foo for PHP" instead of calling it "PHP Foo" or "phpfoo"
  5. The PHP Group may publish revised and/or new versions of the license from time to time. Each version will be given a distinguishing version number. Once covered code has been published under a particular version of the license, you may always continue to use it under the terms of that version. You may also choose to use such covered code under the terms of any subsequent version of the license published by the PHP Group. No one other than the PHP Group has the right to modify the terms applicable to covered code created under this License.

  6. Redistributions of any form whatsoever must retain the following acknowledgment: "This product includes PHP software, freely available from http://www.php.net/software/".

THIS SOFTWARE IS PROVIDED BY THE PHP DEVELOPMENT TEAM "AS IS" AND ANY EXPRESSED OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE PHP DEVELOPMENT TEAM OR ITS CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

This software consists of voluntary contributions made by many individuals on behalf of the PHP Group. The PHP Group can be contacted via Email at group@php.net.

For more information on the PHP Group and the PHP project, please see http://www.php.net. PHP includes the Zend Engine, freely available at http://www.zend.com.

zlib / libpng License

This software is provided 'as-is', without any express or implied warranty. In no event will the authors be held liable for any damages arising from the use of this software.

Component Name License URL

zlib-1.2.5 zlib / libpng http://zlib.net/

Copyright (C) 1995-2010 Jean-loup Gailly and Mark Adler

Permission is granted to anyone to use this software for any purpose, including commercial applications, and to alter it and redistribute it freely, subject to the following restrictions:

  1. The origin of this software must not be misrepresented; you must not claim that you wrote the original software. If you use this software in a product, an acknowledgment in the product documentation would be appreciated but is not required.
  2. Altered source versions must be plainly marked as such, and must not be misrepresented as being the original software.

  3. This notice may not be removed or altered from any source distribution.

Jean-loup Gailly Mark Adler

jloup@gzip.org madler@alumni.caltech.edu

The data format used by the zlib library is described by RFCs (Request for Comments) 1950 to 1952 in the files http://www.ietf.org/rfc/rfc1950.txt (zlib format), rfc1951.txt (deflate format) and rfc1952.txt (gzip format).

Hanwha SNV-8081R - Component Name License URL - 1

Any changes or modifications in construction of this device which are not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment.

This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.

This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment.

This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instruction manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense.

Hanwha SNV-8081R - Component Name License URL - 2

Hanwha Techwin cares for the environment at all product manufacturing stages, and is taking measures to provide customers with more environmentally friendly products.

The Eco mark represents Hanwha Techwin's devotion to creating environmentally friendly products, and indicates that the product satisfies the EU RoHS Directive.

Hanwha SNV-8081R - Component Name License URL - 3

natural_image Symbol of a trash bin crossed with two crossed lines, no text or labels present

Correct Disposal of This Product (Waste Electrical & Electronic Equipment)

(Applicable in the European Union and other European countries with separate collection systems)

This marking on the product, accessories or literature indicates that the product and its electronic accessories (e.g. charger, headset, USB cable) should not be disposed of with other household waste at the end of their working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate these items from other types of waste and recycle them responsibly to promote the sustainable reuse of material resources.

Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take these items for environmentally safe recycling.

Business users should contact their supplier and check the terms and conditions of the purchase contract. This product and its electronic accessories should not be mixed with other commercial wastes for disposal.

Hanwha SNV-8081R - Correct Disposal of This Product (Waste Electrical &amp; Electronic Equipment) - 1

Correct disposal of batteries in this product

(Applicable in the European Union and other European countries with separate battery return systems.)

This marking on the battery, manual or packaging indicates that the batteries in this product should not be disposed of with other household waste at the end of their working life. Where marked, the chemical symbols Hg, Cd or Pb indicate that the battery contains mercury, cadmium or lead above the reference levels in EC Directive 2006/66. If batteries are not properly disposed of, these substances can cause harm to human health or the environment.

To protect natural resources and to promote material reuse, please separate batteries from other types of waste and recycle them through your local, free battery return system.

Head Office

86 Cheonggyecheon-ro Jung-gu Seoul 04541 Korea

Tel +82.2.729.5277, 5254 Fax +82.2.729.5489

www.hanwha-security.com

Hanwha Techwin America

100 Challenger Rd. Suite 700 Ridgefield Park, NJ 07660

Toll Free +1.877.213.1222 Direct +1.201.325.6920

Fax +1.201.373.0124

Hanwha Techwin Europe

2nd Floor, No. 5 The Heights, Brooklands, Weybridge, Surrey,

KT13 0NY, UK

Tel +44.1932.82.6700 Fax +44.1932.82.6701

Table of contents Click a title to access it
Manual assistant
Powered by Anthropic
Waiting for your message
Product information

Brand : Hanwha

Model : SNV-8081R

Category : Security Camera