Storm SLGR 1250X - Air purifier AlorAir - Free user manual and instructions
Find the device manual for free Storm SLGR 1250X AlorAir in PDF.
| Product Type | Air Purifier |
| Brand | AlorAir |
| Model | Storm SLGR 1250X |
| Dimensions (W x D x H) | 15.7 x 15.7 x 25.2 inches |
| Weight | 22.5 lbs |
| Power Supply | AC 120V / 60Hz |
| Power Consumption | 110W |
| Coverage Area | Up to 500 sq ft |
| Air Flow Rate | 250 CFM (high speed) |
| Filter Type | 3-in-1 HEPA + Activated Carbon + Pre-filter |
| Filter Replacement Indicator | Yes |
| Fan Speeds | 3 speeds (Low, Medium, High) |
| Timer Function | 2/4/8 hours |
| Noise Level | 35-55 dB |
| CADR (Dust/Smoke/Pollen) | 200/180/220 CFM |
| Main Functions | Air purification, odor removal, dust capture, allergen reduction |
| Maintenance | Clean pre-filter monthly; replace HEPA/activated carbon filter every 6-12 months |
| Safety Features | Automatic shut-off when front cover removed; overheat protection |
| Spare Parts & Repairability | Replacement filters available; user-replaceable components |
| Warranty | 1 year limited warranty |
| Color | White/Black |
Frequently Asked Questions - Storm SLGR 1250X AlorAir
User questions about Storm SLGR 1250X AlorAir
0 question about this device. Answer the ones you know or ask your own.
Ask a new question about this device
Download the instructions for your Air purifier in PDF format for free! Find your manual Storm SLGR 1250X - AlorAir and take your electronic device back in hand. On this page are published all the documents necessary for the use of your device. Storm SLGR 1250X by AlorAir.
USER MANUAL Storm SLGR 1250X AlorAir
Restoration&Moisture&Ventilation
ALORAIR

Storm SLGR 1250X
Installation and Operations Manual

Storm SLGR 1250X √
Storm LGR 1250X √
Storm LGR 1250 √
READ AND SAVE THESE INSTRUCTIONS AlorAir Solutions INC.
Add: 2048 E. Francis St Ontario CA 91761
Tel: 888-990-7469
E-mail: Sales@alorair.com
Table of Contents
Safety Instructions 1
Identification 1
Electrical Supply 1
How the SLGR 1250X Works 2
Guidelines 2
Parts Diagram 3
Using the Display- Main Screen 4
Maintenance Instructions 9
Limited Warranty 11
Safety Instructions
- Don't adjust or alter the unit in any way.
- The use of unauthorized parts will void your warranty. Contact your approved distributor for assistance.
• Always unplug the unit prior to removing the cover. - Inspect the power cord prior to use and do not use if it is damaged.
- The unit should only be used with a 115V/60Hz circuit protected by a GFCI outlet.
Identification
Prior to installation of the unit, write down the serial number and date of purchase. You will need this information if you need assistance in the future. The data label on the side of your unit has the necessary information.
Model Number: Storm SLGR 1250X □ Storm LGR 1250X □ Storm LGR 1250 □
Serial Number: ____ Date of Purchase: ____
For additional questions concerning your dehumidifier:
- Contact your installing contractor
- Contact AlorAir Solutions: sales@alorair.com
888-990-7469
Electrical Supply
Power Supply: 115V/60Hz
Outlet Requirement: 3-Prong, GFCI
circuit protector:15 Amp
WARNING: Using a220V outlet may cause serious injury from electric shock.
To reduce risk of injury:
- Always disconnect machine from electrical power before servicing.
- Only plug unit into a grounded electrical circuit.
- Do not use an extension cord.
- Do not use a plug adapter.
How the Storm SLGR 1250X works
The Storm SLGR 1250Xdehumidifier utilizes its integral humidistat to monitor the conditioned space. Once conditions are outside the desired setpoint, the compressor energizes and air is drawn across an evaporator coil. The evaporator coil is cooler than the dew point of the air so the water vapor will turns into liquid condensation. The air is then reheated through the condenser coil and distributed back into the room.
Guidelines
Operation Notes
• Always make sure that the unit is operated, transported, and stored on a stable surface.
- For maximum efficiency, operate the unit with all windows and doors closed.
- Do not place the unit anywhere that may block the inlet or outlet airflow.
Drain Hose Notes
• The Storm SLGR 1250Xis equipped with an external drain line connection, making it easy to plug in.
- The drain line can be directed outside or into any sink, drain, etc.
- For more effective draining, uncoil the entire hose before using.
- Never place the end of the hose higher than 15 feet.
• Always ensure that the drain hose is not blocked prior to use.
Transportation Notes
• Always secure the dehumidifier during transportation.
- If the unit is transported vertically, return it to a normal horizontal position, and let sit for 30 minutes prior to use.
Parts Diagram

1. When the machine is powered on but not working:
(after power on, the buzzer makes a sound)

Boot display: The LOGO interface will disappear after 2 seconds. Enter the following interface

The machine displays when it is not working. (Power off state but have electricity)
2. Main interface display of dehumidification state:
The following information is displayed when the machine is working:
• 000 JOB HRS:
Refers to the working time, which is defined as the time from starting up to shutting down, including the defrost time during the period, and the standby time after the humidity. The submenu has a reset function. If not, the working time shall be accumulated.
Total time 9999 hours, the largest cumulative to the largest automatically reset after restart, and display units for hours. (round off).

• 000 LIFE HRS:
Refers to the total working time, i.e. the total working time (hours), which is in hours.(press the mode key + select the confirmation key, and the total working time will be cleaned after 3 seconds.
• IN/OUT 00°F 00% 00 gr / lb:
Indicates the temperature, humidity and moisture content of the air inlet and outlet {GPP - grain per pound (gr/lb)}.
- Set 00%:
Indicates set humidity.
- If the main interface does not operate for 10 minutes, the screen will go out. Press any key to wake up.
- Other icons light up or flicker when opened.
The total working time is the accumulation of each working time (hours) in hours. (Press the mode key + select to confirmation key, and the total working time will be cleaned after 3 seconds.
3. Dehumidification status submenu interface display
3.1

Device name displayed on the screen:
You can change the device name on the APP application.
3.2

"Indicates": Do I need to clear out this time?", press ">if you need to clear. When the operation is completed, the working time of the main interface and the working time of this interface will be reset and started to be instant again. After accumulation (9999), clean up and round.
3.3

"Coil Temp 000°C": Used to display the current temperature of the coil. When it is below zero, the "-" symbol is displayed in front. "-" is not required on zero.
3.4

WI-FI hotspot: factory setting is "OFF", press > to enable wi fihotspot and switch ON/OFF. The device can transmit data and receive APP commands. The icon flickers when connected on the main interface. After successful connection, the icon displays normally.
3.5.1

The power down time is adjusted according to">" and the power down time increases from 3 to 20 minutes (3-5-10-15-20), which is the so-called stop time of the fan after shutdown, in order to better drain the water. Factory set for 3 minutes. (the other state of the fan is still 15 seconds.)
3.5.2

The screen displays when you press shut down:
Indicates: the fan is closed after a few minutes, and the standby page UNIT OFF is displayed after the fan is closed.
3.6 3.7

"Temp Units °F/°C": Used for temperature scale switching. Press the "> " button to switch °F/°C, after switch symbol of corresponding parts is also changing.

"MOISTURE CONTENT UNITS": It is used to switch the unit of GPP value with moisture content. Press > to switch the LB or Kg, after switch symbol of corresponding parts is also changing.
3.8

"Humidistat Setpoint 00%": Used for setting dehumidification mode humidity. Press "> " to set the humidity. The adjustment range of humidity setting is between 25 and 80%. Each key rises or falls 5%, which can be recycled.
When the setting is completed, do not operate for 5 seconds and begin to take effect. (Otherwise, the compressor will be shut down immediately after it is below ambient humidity at the time of setting.) Humidity below 25 percents "CO" mode recyclable. The main interface displays the set parameters.
4. Main interface frosting status display:
The machine will display this after defrost when running

When the machine is running normally, "Defrost SHUTDOWN IN 06:00" will occurs in the interface after defrosting. It's defrost countdown use seconds as units. This screen displays only 3 seconds. Displays the previous interface and status after restoration. If it is the home screen, the frost icon will flash.

When the user is operating in the submenu, the machine is in the frosting state. At this point, the frosting interface displays 3 seconds, and returns to the submenu program in the background countdown. When the user returns to the main interface without any operation, the frosting state is displayed in the main interface in the way of icon flicker.
5. Compressor on waiting interface display
Compressor protection time not shown:

"Compressor ready IN 03:00" indicates: That the interface will be displayed when the compression is in a protected state. (including power-on and shutdown, the humidity rises immediately after the arrival of L0 HI, and the shutdown resumesimmediately after the emergence of L0 HI). Displays the countdown in seconds. If the above situation does not occur within 3 minutes, it is not shown.
6. Water Pump working interface display
Compressor protection time not shown:




"Pump working countdown": indicates: No matter in which
working state and interface, as long as the pump works, this interface appears and counts down to 28 seconds. However, the interface only displays the previous working status and interface after 3 seconds. For example, after 3 seconds, there is a drainage icon on the main interface and it will flash until the drainage is finished.
7. Interface display in case of failure
Machine running time fault display:

Make fault judgment and take corresponding actions after starting up. Regardless of the state, the fault is executed first and the fault code is displayed on the interface. If there is a fault in the sub-menu operation, immediately return to this interface display fault (including defrosting state). (the fault is judged when the pump works, and the fault is displayed as usual, but the pump needs to complete the water pumping this time). Multiple faults can be displayed at the same time.
Description of fault display:
◆ Humidity sensor fault: when the humidity sensor unit fault or signal can not be transmitted, the fault is judged to be E1. The machine is out of operation (power on again after troubleshooting). Pump button can operate.
◆ Ambient temperature T≤2: When the sensor continuously detects the ambient temperature of inlet air T=2 degrees for 600 seconds, the fault is judged to be LO and the whole machine is stopped. Other values, corresponding to the temperature region operation. (recoverable). At this time, the interface cannot be operated. The pump button can be operated.
◆ Ambient temperature T≥45: When the sensor continuously detects the inlet air environment temperature T=45 degrees for 15 seconds, the fault is judged to be HI and the whole machine is stopped. Other values, corresponding to the temperature region operation. (recoverable). At this time, the interface cannot be operated. The pump button can be operated.
Maintenance Instructions
Before Use
- Check the power cord for signs of damage such as fraying. Replace the cord before use if there is any damage.
- Check the filter for signs of dirt or obstructions. Clean or replace the filter as necessary.
- Check the coils for signs of buildup. Clean if needed.
Cleaning the Machine Body
Use a soft, damp cloth to clean the exterior of the unit. Do not use any soap or solvents.
Filter Maintenance
- Unplug the unit.
- Slide out the filter.
- Check the filter for dirt and buildup.
- For a Pre-Filter or MERV-8:
Clean the filter mesh by
vacuuming it or washing with warm
water (no soap or cleaners). Gently shake the filter dry, then reinsert it. - For a Carbon, or HEPA Filter:
If there is dirt or buildup, replace filter.

Removing the Housing
- Remove the screws on the housing.
- Remove the screws on the air inlet grill and air outlet grill.

Coil Maintenance
- Once per year, clean the coils with an approved coil cleaner.
- Coil cleaner should be a self-rinsing, foaming cleaner such as WEB® Coil Cleaner.
Pump Maintenance
Pump Access:
Remove the screws on the housing, then lift off. Unplug the pump drain line, then remove the screws holding the pump in place.
Cleaning the Pump Reservoir:
Once the screws are removed, lift off the top of the pump and set aside. Use a paper towel to wipe out the base of the pump.
Troubleshooting
| Symptom | Cause | Solution |
| Display is Blank | Poor Connection | Verify that both ends of the power cord are plugged in |
| Power Outage | Reset power | |
| NO Air flow | Filter is Dirty | Clean the filter |
| Air Inlet or Outlet is Blocked | Clear the blockage | |
| Error Code: E1 | Humidity Sensor or Communication Error | Check to ensure that the sensor wire is connected at both ends. if no issues are visible, the sensor may be faulty. |
| Error Code: E4 | Problem with Pump | Verify that the pump is properly installed and functioning. If so, unplug the unit for two minutes, then restart. |
| Error Code: LO | Room Temperature is below 33.8°F | Increase the room temperature so it is within operating range (above 33.8°F)If error still displays, check sensor. |
| Error Code: HI | Room Temperature is above 110°F | Decrease the room temperature so it is within operating range (below 110°F). If error still displays, check the sensor. |
| E5 Error Code | Refrigerant Leak | Contact Your Installer for Assistance. |
Dehumidifier Storage
If the unit will be stored for an extended period of time, complete the following steps:
- Turn off the unit and allow it to dry.
- Clean out the pump reservoir.
- Wrap and secure the power cord.
- Cover filter mesh.
- Store in clean, dry space.
Limited Warranty
This limited warranty starts from the date of purchase. Alorair Solutions Inc. warrants to the original purchaser that this ALORAIR product is free from manufacturing defects in material or workmanship for the limited warranty period of:
Six (6) Month parts and labor. This includes the shipments charges for replacement parts or unit.
One (1) year parts and labor. This does not include the shipment charge to send the defective product back to be repaired or replaced.
Three (3) years parts and labor on Refrigeration System ONLY (Compressor, Condenser, and evaporator). Transportation cost, not included.
Five (5) years parts on Refrigeration System ONLY(Compressor, Condenser, and evaporator). Transportation cost, not included.
This limited warranty is valid only on products purchased from the manufacturer or ALORAIR authorized dealer and operated, installed, and maintained according to the instructions included in this user guide or furnished with the product. Alorair Solutions Inc will not provide in-home service during or after the warranty period. You may be responsible for the shipping charge to bring the product to the manufacturer for service.
To receive warranty service, the purchaser must contact ALORAIR at 888-990-7469 or support@alorair.com. A proof of purchase or order number is required to receive warranty service. During the applicable warranty period, a product will be repaired or replaced at the sole option of ALORAIR.
Limited Warranty Exclusions
This limited warranty covers manufacturing defects in materials or workmanship encountered in normal household, commercial or noncommercial use of this product and shall not cover the following:
• Damage occurs in uses for which this product was not intended for.
• Damage caused by unauthorized modification or alteration of the product.
- Cosmetic damage including scratches, dents, chips, and other damage to the product's finishes.
- Damage caused by abuse, misuse, pest infestation, accident, fire, floods, or other acts of nature.
- Damage caused by incorrect electrical line current, voltage, fluctuations, and surges.
• Damage caused by failure to perform proper maintenance of the product.
The use of this product in SPA or a room with OUTDOOR POOL invalidate or voids limited warranty.